WorldWideScience

Sample records for near-term operating licenses

  1. Generic evaluation of feedwater transients and small break loss-of-coolant accidents in GE-designed operating plants and near-term operating license applications

    International Nuclear Information System (INIS)

    1980-01-01

    The results are presented of a generic evaluation of feedwater transients, small-break loss-of-coolant accidents (LOCAs), and other TMI-2-related events for General Electric Company (GE)-designed operating plants and near-term operating license applications to confirm or establish the bases for the continued safe operation of the operating plants. The results of this evaluation are presented in this report in the form of a set of findings and recommendations in each of the principal review areas. Additional review of the accident is continuing and further information is being obtained and evaluated. Any new information will be reviewed and modifications will be made as appropriate

  2. NPP long term operation in Spain - First application for license renewal

    International Nuclear Information System (INIS)

    Francia, L.; Gorrochategui, I.; Marcos, R.

    2007-01-01

    Full text: In the operation of the Spanish nuclear power plants (NPP), safety is always the prime consideration. Plant Life Management Programmes have been set up with the strategic objective to operate the NPPs as long as they are considered safe and reliable. The safety of each NPP is reviewed by the Spanish nuclear regulatory authority (CSN) under a continuous process. In addition, experience is gained from operating the plants and from exchanges with operators of similar units. Current Spanish regulatory framework for renewing NPP operating licenses requires performing a Periodic Safety Review (PSR) to be performed every 10 years and submitted when applying for a new renewal of the NPP operating license. A few years ago, CSN issued a document regarding the licensing requirements that nuclear power plants should meet in order to be granted with an operating license for long term operation (i.e, operation beyond the original plant design life, typically 40 years). Besides the traditional PSR requirements, specific requirements regarding to long term operation (LTO) include: - An Aging Management and Evaluation Program, including the identification and evaluation of Time Limited Aging Analysis (TLAA). - An updated Radiological Impact Study. - A review and assessment of regulation/standard applicability. Garona NPP (GE, BWR/3 design) operated by Spanish utility Nuclenor from 1971 has a current operating license up to 2009. A decision was made to apply for a new operating license, being Garona plant the first one in Spain to face with the new long term operation requirements. The paper will provide an overview of the methodology used in Spain to address and perform the required analyses to support the LTO application for the operating license renewal. In particular, focus will be paid on the project developed in Garona (2002-2006) whose result has been the first Spanish application for License Renewal for LTO. Also it will be reported the ongoing work necessary to

  3. Safety evaluation report related to the full-term operating license for San Onofre Nuclear Generating Station, Unit 1 (Docket No. 50-206)

    International Nuclear Information System (INIS)

    1991-07-01

    The safety evaluation report for the full-term operating license application filed by the Southern California Edison Company and the San Diego Gas and Electric Company has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in San Diego County, California. The staff has evaluated the issues related to the conversion of the provisional operating license to a full-term operating license and concluded that the facility can continue to be operated without endangering the health and safety of the public following the license conversion. 43 refs., 3 figs., 3 tabs

  4. Renewal of operating licenses: the U.S. model

    International Nuclear Information System (INIS)

    Petroll, M.; Tveiten, B.

    2006-01-01

    Nearly half of the American nuclear power plants by now have been granted permits allowing them to be operated for twenty years more than originally planned. Procedures to this effect are under way for one quarter of U.S. nuclear power plants. For the operators, plant life extension, as a rule, is economically preferable to building new baseload plants or buying electricity from other sources. In the licensing procedures, the U.S. regulatory authority examines both environmental aspects and safety aspects of extended operation. The technical basis of assessment is the GALL report (Generic Aging Lessons Learnt) which by now has become the consolidated yardstick used by the authorities for safety assessment. In these procedures, the licensee is required to present updated design documents and, if applicable, extend or create from scratch programs of aging management. The case of the oldest nuclear power plant in operation in the United States is described to show the steps of an American licensing and administrative court procedure. Granting renewed operating permits began before President Bush's term and will continue independent of the change in government in 2008. (orig.)

  5. Long Term Operation R and D to Investigate the Technical Basis for Life Extension and License Renewal Decisions

    International Nuclear Information System (INIS)

    Gaertner, John

    2012-01-01

    Establishing an improved technical basis for long term operation of existing plants is a nuclear industry priority. The Electric Power Research Institute (EPRI) has responded with a comprehensive Long Term Operation (LTO) Program addressing this need for existing nuclear power plants world-wide. The program supports both the business decisions necessary to achieve high performance operation and the licensing requirements for operation beyond 60 years. The program selects its R and D priorities in a structured and objective way with much industry input to provide useful results for decisions in the 2014 to 2019 time frame. The program is highly collaborative with U.S. Department of Energy (DOE) and with EPRI-member utilities. The R and D portfolio includes materials aging (metals, concrete, and cables), modernization of information and control technology, enhanced safety analysis, advanced fuel design, demonstration plant activities, life cycle management, and identification of aging management program need for subsequent license renewal. The program has focussed stakeholders world-wide on the technical issues of long term operation, and it is on-track to provide practical results for life extension and license renewal decisions. (author)

  6. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  7. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  8. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  9. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  10. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  11. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  12. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  13. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  14. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  15. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  16. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  17. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  18. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  19. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  20. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  1. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  2. Licensing of nuclear reactor operators

    International Nuclear Information System (INIS)

    1979-09-01

    Recommendations are presented for the licensing of nuclear reactor operators in units licensed according to the legislation in effect. They apply to all physical persons designated by the Operating Organization of the nuclear reactor or reactors to execute any of the following functional activities: a) to manipulate the controls of a definite reactor b) to direct the authorized activities of the reactor operators licesed according to the present recommendations. (F.E.) [pt

  3. Non-Power Reactor Operator Licensing Examiner Standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, this standard will be revised periodically to accommodate comments and reflect new information or experience

  4. Analyses of operating license renewal for nuclear power plants in USA

    International Nuclear Information System (INIS)

    Chiba, Goro

    2007-01-01

    Although the originally-approved operating period for nuclear power plants in the U.S. is 40 years, the operating periods of many plants have been extended by license renewal for another 20 years. On the other hand, in Japan, plant life management is carried out assuming long-term operation of the plant, and the electric power company submits reports, such as aging technology assessment, and receives evaluation by the authorities. In this paper, the situation regarding plant life management was investigated and a Japan-U.S. comparison was made. As a result, differences were found in the procedure, the background, the manpower, the review period, etc. in Japan and the U.S. but there is no difference between Japan and the U.S. in aiming for a check of the integrity of components, assuming long-term operation for 60 years. Moreover, trend analysis using the overseas fault database of INSS examined the effect on the preservation activities of a license renewal. As a result, there is a tendency for license renewal not to be applied for in units in which the number of aging faults increases with the increase in elapsed years. The U.S. license renewal system was considered to be effective in plant life management, and suggested the validity of plant life management in Japan which is employing the equivalent system to the U.S. (author)

  5. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-11-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page

  6. Why operators fail licensing examinations

    International Nuclear Information System (INIS)

    Roth, D.R.; Zerbo, J.N.

    1975-01-01

    A survey was conducted among nuclear utility operators who have taken NRC licensing examinations to determine which factors they considered important in their success or failure. The operators also compared the actual NRC examination with their expectations prior to taking the examination. The results of the survey supplement NRC statistics with regard to failure rates. Over 350 operators and 20 utilities participated in the survey and a good cross section of the nuclear community is represented. Reactor theory and emergency procedures are important areas in which operators found NRC emphasis to be different than expected. Observation Training and Design Lecture Series are two training segments which appear to require improvement. Recommendations are made for the use of data collected through this survey and for continuation of the effort to give operators a mechanism of supplying feedback to the training and licensing process

  7. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  8. TMI-related requirements for new operating licenses. Technical report

    International Nuclear Information System (INIS)

    1980-06-01

    There are four types of TMI-related requirements and actions approved by the Commission for new operating licenses: (1) those required to be completed by a license applicant prior to receiving a fuel-loading and low-power testing license, (2) those required to be completed by a license applicant prior to receiving a license to operate at appreciable power levels up to full power, (3) those the NRC will take prior to issuing a fuel-loading and low-power testing or a full-power operating license, and (4) those required to be completed by a licensee prior to a specified date. In this report, only those dated requirements that have already been issued are of interest. Other dated requirements are expected to be issued in the future as work progresses in accordance with the TMI Action Plan. This report summarizes the several parts of the list of TMI-related requirements approved by the Commission for new operating licenses

  9. Operating reactors licensing actions summary. Vol. 3, No. 3

    International Nuclear Information System (INIS)

    1983-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regularory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  10. Safety Evaluation Report related to the full-term operating license for Dresden Nuclear Power Station, Unit 2 ( Docket No. 50-237)

    International Nuclear Information System (INIS)

    1990-10-01

    The Safety Evaluation Report for the full-term operating license application filed by Commonwealth Edison Company for the Dresden Nuclear Power Station, Unit 2, has been prepared by the Office of Nuclear Regulation of the US Nuclear Regulatory Commission. The facility is located in Grundy County, Illinois. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can continue to be operated without endangering the health and safety of the public. 72 refs

  11. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    THE OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  12. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-04-01

    The Operating Units Status Report --- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff on NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non- power reactors in the US

  13. Greenland unveils terms for offshore licenses

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Greenland has spelled out terms for its first round of offshore licensing. The action off western Greenland could lead to the first oil and gas exploration there since an unsuccessful campaign in the 1970s. The Mineral Resources Administration (MRA) for Greenland pegged exploration license terms on 133 blocks, all south of the 66th parallel, at 10 years with options for 2 year extensions to a maximum of 6 more years. The license can cover as many as six blocks. In the first 3 year period companies will have only a seismic obligation of 1,588 km per six blocks. For the second 3 year period there will be a one well obligation and one well in each subsequent 2 year periods

  14. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  15. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

  16. Operating reactors licensing actions summary. Vol. 3, No. 6

    International Nuclear Information System (INIS)

    1983-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  17. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  18. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  19. Long term operation of nuclear power plants in the U.S

    International Nuclear Information System (INIS)

    Young, G.G.

    2015-01-01

    This series of slides shows that safety, performance, cost, environmental and public opinion factors are favorable for long term operation of U.S. nuclear power plants. In the U.S. 1 reactor has an operating life ranging between 10 and 19 years, 37 reactors have an operating life ranging between 20 and 29 years, 42 reactors between 30 and 39 years and 20 reactors have an operating life over 40 years. The original license term is 40 years and it can be extended by 20 years for each renewal. The application for renewal must be at least 5 years before expiration of the current license. 3 main areas are reviewed by NRC to get the renewal: safety, environmental and adjudicatory. A slide describes the NRC license renewal process and another slide lists the regulatory and industry guidance documents based on lessons learned and operating experience. Research and development efforts around materials aging and safety margin characterization by EPRI, DOE, NRC and industry groups are essential to support and maintain the option of long term operation of nuclear reactors. (A.C.)

  20. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  1. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  2. Operating reactors licensing actions summary. Vol.4, No. 4

    International Nuclear Information System (INIS)

    1984-06-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  3. Licensed operating reactors

    International Nuclear Information System (INIS)

    1991-08-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar 1990) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  4. 48 CFR 252.227-7007 - License term-running royalty.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false License term-running... of Provisions And Clauses 252.227-7007 License term—running royalty. As prescribed at 227.7009-4(b), insert the following clause in patent releases, license agreements, and assignments: License Term—Running...

  5. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  6. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units are provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Astrophysics science operations - Near-term plans and vision

    Science.gov (United States)

    Riegler, Guenter R.

    1991-01-01

    Astrophysics science operations planned by the Science Operations branch of NASA Astrophysics Division for the 1990s for the purpose of gathering spaceborne astronomical data are described. The paper describes the near-future plans of the Science Operations in the areas of the preparation of the proposal; the planning and execution of spaceborne observations; the collection, processing, and analysis data; and the dissemination of results. Also presented are concepts planned for introduction at the beginning of the 20th century, including the concepts of open communications, transparent instrument and observatory operations, a spiral requirements development method, and an automated research assistant.

  8. Psychological characteristics of licensed nuclear power plant operators

    International Nuclear Information System (INIS)

    Sajwaj, T.; Ford, T.; McGee, R.K.

    1987-01-01

    The safe production of electricity by nuclear power plants has been the focus of considerable attention. Much of this concern has been focused on equipment and procedural issues, with less attention to the psychological factors that affect the operations staff of the plants, i.e., those individuals who are most directly responsible for a plant's operations. Stress and type A qualities would be significant for these individuals because of their relationships to job performance and health. Of equal significance would be work-related factors, such as job involvement and work pressure. Also of interest would be hostile tendencies because of the need for cooperation and communications among operations staff. Two variables could influence these psychological factors. One is the degree of responsibility for a plant's nuclear reactors. The individuals with the greatest responsibility are licensed by the US Nuclear Regulatory Commission (NRC). There are also individuals with less direct responsibilities who are not licensed. A second variable is the operating status of the plant, whether or not the plant is currently producing electricity. Relative to ensuring the safe operation of nuclear power plants, these data suggest a positive view of licensed operators. Of interest are the greater stress scores in the licensed staff of the operating plant in contrast with their peers in the nonoperating plant

  9. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  10. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1990-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  11. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  12. Operating reactors licensing actions summary. Volume 5, Number 1

    International Nuclear Information System (INIS)

    1985-03-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  13. Licensing operators for commercial nuclear power plants

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1988-01-01

    The human element in the operation of commercial nuclear power plants is of utmost importance. Not only must the operators be technically competent in the execution of numerous complicated tasks, they must be capable of working together as a team to diagnose dynamic plant conditions to ensure that their plants are operated safely. The significance of human interaction skills and crew communications has been demonstrated most vividly in TMI and Chernobyl. It follows that the NRC must retain its high standards for licensing operators. This paper discusses activities and initiatives being employed by the NRC to enhance the reliability of its licensing examinations, and to build a highly qualified examiner work force

  14. 48 CFR 252.227-7005 - License term.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false License term. 252.227-7005..., DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions And... referred to in the “License Grant” clause of this contract and any and all patents hereafter issued on...

  15. Selection/licensing of nuclear power plant operators

    International Nuclear Information System (INIS)

    Saari, L.M.

    1983-07-01

    An important aspect of nuclear power plant (NPP) safety is the reactor operator in the control room. The operators are the first individuals to deal with an emergency situation, and thus, effective performance on their part is essential for safe plant operations. Important issues pertaining to NPP reactor operators would fall within the personnel subsystem of our safety system analysis. While there are many potential aspects of the personnel subsystem, a key first step in this focus is the selection of individuals - attempting to choose individuals for the job of reactor operator who will safely perform the job. This requires a valid (job-related) selection process. Some background information on the Nuclear Regulatory Commission (NRC) licensing process used for selecting NPP reactor operators is briefly presented and a description of a research endeavor now underway at Battelle for developing a valid reactor operator licensing examination is included

  16. Status of long term operation of nuclear power plants in the US

    Energy Technology Data Exchange (ETDEWEB)

    Young, G., E-mail: gyoung4@entergy.com [Entergy Nuclear, License Renewal, New Orleans, LA (United States)

    2014-07-01

    As of early-2014, the U.S. Nuclear Regulatory Commission (NRC) has renewed the operating licenses for 73 of the 100 U.S. operating nuclear units, allowing for up to 60 years of safe operation. In addition, the NRC has license renewal applications under review for 18 more units and up to 8 additional units have announced plans to submit applications by 2018. This brings the total of renewed licenses and announced plans for renewal to 99% of the operating nuclear units in the U.S. In addition, by the end of 2014, there will be 38 nuclear plants that will have operated for more than 40 years and will be eligible to seek a subsequent license renewal to allow operation up to 80 years. Although some of the operating nuclear units are expected to shutdown due to economic issues, most of the remaining operating plant owners are keeping the option open for long term operation beyond 60 years. NRC and the U.S. nuclear industry have made significant progress in preparing the way for subsequent license renewal applications. This presentation covers the status of the U.S. license renewal process and issues being addressed for possible applications for subsequent renewals for up to 80 years of operation. (author)

  17. 78 FR 29393 - University of Missouri-Columbia Facility Operating License No. R-103

    Science.gov (United States)

    2013-05-20

    ... Facility Operating License No. R-103 AGENCY: Nuclear Regulatory Commission. ACTION: License renewal... the renewal of Facility Operating License No. R-103 (``Application''), which currently authorizes the... application for the renewal of Facility Operating License No. R-103, which, currently authorizes the licensee...

  18. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  19. License renewal in the United States

    International Nuclear Information System (INIS)

    Brons, Jack

    2002-01-01

    Full text: Nuclear plants in the United States are licensed for 40 years, a length specified in the Atomic Energy Act of 1954, which laid out much of the regulatory basis for the commercial nuclear industry. The Act, however, made provision for license renewal. The original 40-year license period was chosen arbitrarily by the U.S. Congress because it was the typical period over which utilities recovered their investment in electricity generating plants. Nuclear plants, however, are subject to a rigorous program of Nuclear Regulatory Commission oversight, maintenance and equipment replacement. In effect, they must be in the same operating condition on the last day of their licenses as they were on the first. As the industry matured, it became apparent that there was no physical limitation on the continued operation of nuclear plants past 40 years. The industry turned its attention toward license renewal. When the issue was first raised, the NRC considered stringent process equivalent to seeking a new operating license for each plant. The complexity, length and cost of the process made it unlikely that many nuclear plants would seek license renewal. The nuclear industry worked successfully with NRC on the application of generic principles to license renewal, however, and in 1995, the NRC issued an efficient, tightly-focused rule that made license renewal a safe, viable option. To extend the operating license for a reactor, a company must demonstrate to the NRC that aging effects will be adequately managed during the renewal terms, thus ensuring equipment functionality. The rule allows licensees to apply for extensions of up to 20 years. The first license renewal application was filed in 1998 by the owner of the two-unit Calvert Cliffs plant. Shortly thereafter, an application was filed for the three-unit Oconee Nuclear Station. The NRC renewed the licenses for all five units in 2000, and since then, five more licenses have been renewed. The NRC has received 37

  20. Safety Evaluation Report related to the full-term operating license for Millstone Nuclear Power Station, Unit No. 1 (Docket No. 50-245). Supplement No. 1

    International Nuclear Information System (INIS)

    1986-08-01

    This report, prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission, supplements the Safety Evaluation Report (NUREG-1143, October 1985). It fulfills a commitment to provide the Advisory Committee on Reactor Safeguards report, identifies the changes that have occurred since the Safety Evaluation Report was issued, and specifies the effective lifetime for the Full-Term Operating License

  1. Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-04-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney disposal site. The site is in Mesa County near Grand Junction, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects public health and safety and the environment. Before each disposal site may be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Cheney disposal site. The general license becomes effective when the NRC concurs with the DOE's determination that remedial action is complete and the NRC formally accepts this plan. This document describes the long-term surveillance program the DOE will implement to ensure that the Cheney disposal site performs as designed. The program is based on site inspections to identify potential threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR section 40.27(b) and 40 CFR section 192.03

  2. International petroleum licensing, exploration activity and fiscal terms

    International Nuclear Information System (INIS)

    Hodgshon, S.

    1994-01-01

    Although there is no decline in current international petroleum licensing activity, attention is drawn to the fact that it is concentrated in certain countries, many of them amongst the less geologically prospective. Among the factors other then geological prospectivity which promote a successful licensing and exploration environment, the most important is the fiscal terms offered. While countries which are highly prospective geologically may stiffen terms and still attract exploration companies because they feel they can make major discoveries, any decline in prospectivity needs to be accompanied by a matching change in fiscal terms to maintain interest. Less prospective countries which, hitherto, have created favourable investment conditions may however find that further declines cannot be reversed by attractive fiscal terms. (7 figures, 3 tables). (UK)

  3. Personality Factors and Nuclear Power Plant Operators: Initial License Success

    Science.gov (United States)

    DeVita-Cochrane, Cynthia

    Commercial nuclear power utilities are under pressure to effectively recruit and retain licensed reactor operators in light of poor candidate training completion rates and recent candidate failures on the Nuclear Regulatory Commission (NRC) license exam. One candidate failure can cost a utility over $400,000, making the successful licensing of new operators a critical path to operational excellence. This study was designed to discover if the NEO-PI-3, a 5-factor measure of personality, could improve selection in nuclear utilities by identifying personality factors that predict license candidate success. Two large U.S. commercial nuclear power corporations provided potential participant contact information and candidate results on the 2014 NRC exam from their nuclear power units nation-wide. License candidates who participated (n = 75) completed the NEO-PI-3 personality test and results were compared to 3 outcomes on the NRC exam: written exam, simulated operating exam, and overall exam result. Significant correlations were found between several personality factors and both written and operating exam outcomes on the NRC exam. Further, a regression analysis indicated that personality factors, particularly Conscientiousness, predicted simulated operating exam scores. The results of this study may be used to support the use of the NEO-PI-3 to improve operator selection as an addition to the current selection protocol. Positive social change implications from this study include support for the use of a personality measure by utilities to improve their return-on-investment in candidates and by individual candidates to avoid career failures. The results of this study may also positively impact the public by supporting the safe and reliable operation of commercial nuclear power utilities in the United States.

  4. Nuclear safety requirements for operation licensing of Egyptian research reactors

    International Nuclear Information System (INIS)

    Ahmed, E.E.M.; Rahman, F.A.

    2000-01-01

    From the view of responsibility for health and nuclear safety, this work creates a framework for the application of nuclear regulatory rules to ensure safe operation for the sake of obtaining or maintaining operation licensing for nuclear research reactors. It has been performed according to the recommendations of the IAEA for research reactor safety regulations which clearly states that the scope of the application should include all research reactors being designed, constructed, commissioned, operated, modified or decommissioned. From that concept, the present work establishes a model structure and a computer logic program for a regulatory licensing system (RLS code). It applies both the regulatory inspection and enforcement regulatory rules on the different licensing process stages. The present established RLS code is then applied to the Egyptian Research Reactors, namely; the first ET-RR-1, which was constructed and still operating since 1961, and the second MPR research reactor (ET-RR-2) which is now in the preliminary operation stage. The results showed that for the ET-RR-1 reactor, all operational activities, including maintenance, in-service inspection, renewal, modification and experiments should meet the appropriate regulatory compliance action program. Also, the results showed that for the new MPR research reactor (ET-RR-2), all commissioning and operational stages should also meet the regulatory inspection and enforcement action program of the operational licensing safety requirements. (author)

  5. 78 FR 17450 - Notice of Issuance of Materials License Renewal, Operating License SUA-1341, Uranium One USA, Inc...

    Science.gov (United States)

    2013-03-21

    ... License Renewal, Operating License SUA-1341, Uranium One USA, Inc., Willow Creek Uranium In Situ Recovery.... SUA- 1341 to Uranium One USA, Inc. (Uranium One) for its Willow Creek Uranium In Situ Recovery (ISR... Commission License No. SUA-1341 For Uranium One USA, Inc., Irigaray and Christensen Ranch Projects (Willow...

  6. Safety Evaluation Report related to the full-term operating license for Millstone Nuclear Power Station, Unit No. 1 (Docket No. 50-245)

    International Nuclear Information System (INIS)

    1985-10-01

    The Safety Evaluation Report for the full-term operating license application filed by the Connecticut Light and Power Company, the Hartford Electric Light Company, Western Massachusetts Electric Company and the Millstone Point Company [(now known as Connecticut Light and Power Company (CL and P) and Western Massachusetts Electric Company (WMECO) having authority to possess Millstone-1, 2, and 3, and the Northeast Nuclear Energy Company (NNECO) as the responsible entity for operation of the facilities)] for Millstone Nuclear Power Station Unit 1 has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in the town of Waterford, Connecticut. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can continue to be operated without endangering the health and safety of the public

  7. Operator licensing examination standards for power reactors. Interim revision 8

    International Nuclear Information System (INIS)

    1997-01-01

    These examination standards are intended to assist NRC examiners and facility licensees to better understand the processes associated with initial and requalification examinations. The standards also ensure the equitable and consistent administration of examinations for all applicants. These standards are for guidance purposes and are not a substitute for the operator licensing regulations (i.e., 10 CFR Part 55), and they are subject to revision or other changes in internal operator licensing policy. This interim revision permits facility licensees to prepare their initial operator licensing examinations on a voluntary basis pending an amendment to 10 CFR Part 55 that will require facility participation. The NRC intends to solicit comments on this revision during the rulemaking process and to issue a final Revision 8 in conjunction with the final rule

  8. Operating reactors licensing actions summary. Volume 5, No. 9

    International Nuclear Information System (INIS)

    1985-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  9. Operating reactors licensing actions summary. Volume 5, No. 8

    International Nuclear Information System (INIS)

    1985-10-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  10. Operating reactors licensing actions summary. Volume 4, No. 9

    International Nuclear Information System (INIS)

    1984-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the division of licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  11. Operating reactors licensing actions summary. Vol. 4, No. 2

    International Nuclear Information System (INIS)

    1984-04-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  12. Licensing of nuclear and radioactive installations in Peru

    International Nuclear Information System (INIS)

    Medina Gironzini, E.

    1987-01-01

    In Peru, the Regulation for Ionizing Radiation Sources is applied, which establishes the norms and procedures to follow in the nuclear and radioactive installations of the country in order to assure their correct operation as concerns to the nuclear safety and radiological protection, allowing the emission of the respective licenses. As for the nuclear facilities, this authorization includes the Previous License, the Construction License and the Operation License (provisional and definitive) and for radioactive facilities and equipment generating ionizing radiations: the Construction License and the Operation License. The personnel also require a license that can be an operator license (as for nuclear reactors) or a supervisor license (for nuclear and radioactive facilities). In spite of the above mentioned regulation and its long enforcement period, less than 10% of radioactive facilities in this country are licensed, due to different problems which will be solved in the medium term. (Author)

  13. 47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.

    Science.gov (United States)

    2010-10-01

    ... class of license or endorsement specified below must pass, or otherwise receive credit for, the... endorsement. 13.201 Section 13.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS Examination System § 13.201 Qualifying for a commercial operator license or endorsement...

  14. Long-term surveillance plan for the Estes Gulch disposal site near Rifle, Colorado

    International Nuclear Information System (INIS)

    1997-07-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Estes Gulch disposal site near Rifle, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Estes Gulch disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  15. Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-07-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney Disposal Site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  16. 77 FR 26321 - Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112

    Science.gov (United States)

    2012-05-03

    ... Nuclear Reactor, Renewed Facility Operating License No. R-112 AGENCY: Nuclear Regulatory Commission... Commission (NRC or the Commission) has issued renewed Facility Operating License No. R- 112, held by Reed... License No. R-112 will expire 20 years from its date of issuance. The renewed facility operating license...

  17. THE SOCIAL OPERATING LICENSE OF CORPORATIONS: MINING COMPANIES AND THEIR CONSTITUENTS

    OpenAIRE

    Dumitru Borțun; Camelia Crişan

    2012-01-01

    Several authors from the CSR literature have proposed the termlicense to operate” when referring to companies and their activities in the relevant communities (Visser, 2008, Post, Preston & Sachs, 2002). Others have implied this term when referring to the types of responsibilities a company needs to have in order to be able to exercise its activity in the society (Blair [1994] 2004, Clarke [1998] 2004 and Philips 2003). Consultancy companies have already coined the term: social license to o...

  18. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  19. Role of cognitive models of operators in the design, operation and licensing of nuclear power plants

    International Nuclear Information System (INIS)

    Rasmussen, J.

    1982-01-01

    Cognitive models of the behavior of nuclear power plant operators - that is, models developed in terms of human properties rather than external task characteristics - are assuming increasingly important roles in plant design, operation and licensing. This is partly due to an increased concern for human decision making during unfamiliar plant conditions, and partly due to problems that arise when modern information technology is used to support operators in complex situations. Some of the problems identified during work on interface design and risk analysis are described. First, the question of categories of models is raised. Next, the use of cognitive models for system design is discussed. The use of the available cognitive models for more effective operator training is also advocated. The need for using cognitive models in risk analysis is also emphasized. Finally, the sources of human performance data, that is, event reports, incident analysis, experiments, and training simulators are mentioned, and the need for a consistent framework for data analysis based on cognitive models is discussed

  20. Comparison of licensing activities for operating plants designed by Babcock and Wilcox

    International Nuclear Information System (INIS)

    Thoma, J.O.

    1985-01-01

    This report provides a comparison of a number of licensing activities for the operating Babcock and Wilcox (B and W) plants with emphasis on Rancho Seco. The factors selected were a comparison of staff resources expended in FY84, active licensing action reviews, implementation of NUREG-0737 modifications, exemptions to regulations, SALP reports, enforcement actions, and Licensee Event Reports (LERs). The eight licensed operating plants examined are as follows: Arkansas Nuclear One Unit 1 (ANO-1), Crystal River Unit 3, Davis Besse, Oconee Units 1, 2, and 3, Rancho Seco, and Three Mile Island Unit 1 (TMI-1)

  1. Perspective about the US license Renewal for NNPP's

    International Nuclear Information System (INIS)

    Lehnert, D. F.

    2004-01-01

    This article provides and overview of the US License Renewal Rule, 10 CFR 54, and its implementation in the US leading to the preparation and review of a license renewal application. The key regulatory documents and the industry's methodology and guidance for successfully implementing the Rule are discussed. While the process still undergoes change and optimization, it has become predictable and reliable, such that utilities can establish realistic schedules and budgets to complete the license renewal process. Nearly 60% of the US operating units have either received and extended operating license, have submitted their application for review, or have committed to submit an application in the next few years. The article concludes with a discussion of lessons learned from this wealth of experience and some emerging issues that may affect license renewal process. (Author)

  2. 77 FR 68155 - The Armed Forces Radiobiology Research Institute TRIGA Reactor: Facility Operating License No. R-84

    Science.gov (United States)

    2012-11-15

    ... Research Institute TRIGA Reactor: Facility Operating License No. R-84 AGENCY: Nuclear Regulatory Commission... considering an application for the renewal of Facility Operating License No. R-84 (Application), which... the renewal of Facility Operating License No. R-84, which currently authorizes the licensee to operate...

  3. The development of reactor operator license examination question bank

    International Nuclear Information System (INIS)

    Kim, In Hwan; Woo, S. M.; Kam, S. C.; Nam, K. J.; Lim, H. P.

    2001-12-01

    The number of NPP keeps increasing therefore there is more need of reactor operators. This trend requires the more efficiency in managing the license examination. Question bank system will help us to develop good quality examination materials and keep them in it. The ultimate purpose of the bank system is for selecting qualified reactor operators who are primarily responsible for the safety of reactor operation in NPP

  4. 76 FR 62868 - Washington State University; Notice of Issuance of Renewed Facility Operating License No. R-76

    Science.gov (United States)

    2011-10-11

    ...; Notice of Issuance of Renewed Facility Operating License No. R-76 AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance of renewed facility operating license No. R- 76. ADDRESSES: You can access.... Nuclear Regulatory Commission (NRC, the Commission) has issued renewed Facility Operating License No. R-76...

  5. Decommissioning of the nuclear licensed facilities at the Fontenay aux Roses CEA Center; cleanup of nuclear licensed facility 57 and monitoring of operations and operating feedback

    International Nuclear Information System (INIS)

    Estivie, D.; Bohar, M.P.; Jeanjacques, M.; Binet, C.; Bremond, M.P.; Poyau, C.; Mandard, L.; Boissonneau, J.F.; Fouquereau, A.; Pichereau, E.

    2008-01-01

    This is a summary of the program for the decommissioning of all the CEA Licensed Nuclear Facilities in Fontenay aux Roses. The particularity of this center is now it is located in a built-up area. It is presented like example the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. It was developed a method applied to establish the multi-annual budget, monitor the progress of operations and integrate, as work continues, the operating feedback. (author)

  6. Analysis of license renewal at U.S. Nuclear Power Plants

    International Nuclear Information System (INIS)

    Nagayama, Munehiro

    2017-01-01

    The U.S. NRC had implemented the rules for LR (License Renewal) of NPPs (Nuclear Power Plants) and the LR rules allow plus 20-year operation of NPPs adding to initial 40-year term for reactor license. The U.S. NRC has already issued ROL (Renewed Operating License) for over forty NPPs. The Atomic Energy Act do not limit the number of LR, so the fleet of U.S. Nuclear, including agency, industry and academy, is continuing efforts to develop rules for SLR (Subsequent License Renewal). The framework of SLR rules has been developed and there is a plan of implementation of SLR for a pilot plant on FY 2018. The total operating term of a SLR plant is 80-year. The LR/SLR of NPPs is effective for stable power supply, greenhouse gas suppression, maintenance of technology, and securing employment. These profits will return to society. It is important to maintain required function of SSCs (Structure, System, and Components) for period of long term operation of NPPs. The U.S. fleet has established integrated ageing management strategy and each NPPs is developing their maintenance plans for long term operation. These adequate maintenance plans may enable to achieve good capacity factor of LR applied NPPs. In this report, domestic LR position will be considered by referring the good performance of U.S. NPPs which entered long term operation beyond 40-year and some conditions such as energy security. (author)

  7. The Role of License Renewal in PLiM for U.S. Nuclear Power Plants

    International Nuclear Information System (INIS)

    Young, G.G.

    2012-01-01

    At the 2nd International Symposium on Nuclear Power Plant Life Management (PLiM) in 2007, it was reported that the NRC had approved renewal of operating licenses for 48 nuclear units, which would allow operation for up to 60 years (i.e., an additional 20 years from the original 40-year license term). Of the 104 operating nuclear units in the U.S. in 2007, it was anticipated that almost 100% would eventually pursue license renewal. At that time, it was also concluded that the regulatory process was stable and predictable for license renewal, and that successful PLiM activities were helping to ensure the safety, economic, and political factors in the U.S. remained favorable for continued success with license renewal. The status of license renewal in 2012 is even better than it was in 2007. As of April 2012, the NRC has approved renewal of the operating licenses for 71 nuclear units and has applications under review for 15 more units. In addition, nuclear plant owners of at least 14 more units have announced plans to submit license renewal applications over the next few years. This brings the total of renewed licenses and announced plans for license renewal to 96% of the 104 currently operating nuclear units in the U.S. The prediction that almost 100% would eventually pursue license renewal is assured. This positive trend for long term operation of nuclear power plants in the U.S. is attributed to: (1) the success of PLiM activities in achieving an excellent safety record for the nuclear power industry and in ensuring on-going positive economics for nuclear plant operation, and (2) the stable and predictable regulatory process for license renewal. U.S. efforts are now underway to consider long term operation for more than 60 years and the process of preparing a second round of license renewals for up to 80 years of operation is likely to begin within the next few years. (author)

  8. Foundation for the adequacy of the licensing bases

    International Nuclear Information System (INIS)

    1991-12-01

    The objective of this report is to describe the regulatory processes that assures that any plant-specific licensing bases will provide reasonable assurance that the operation of nuclear power plants will not be inimical to the public health and safety to the end of the renewal period. It is on the adequacy of this process that the Commission has determined that a formal renewal licensing review against the full range of current safety requirements would not add significantly to safety and is not needed to assure that continued operation throughout the renewal term is not inimical to the public health and safety or common defense and security. This document illustrates in general terms how the regulatory process has evolved in major safety issue areas. It also provides examples illustrating why it is unnecessary to re-review an operating plant's basis, except for age-related degradation unique to license renewal, at the time of license renewal. The report is a supplement to the Statement of Considerations for the Nuclear Regulatory Commission's rule (10 CFR Part 54) that established the criteria and standards governing nuclear power plant license renewal

  9. Use of a Prototype Airborne Separation Assurance System for Resolving Near-Term Conflicts During Autonomous Aircraft Operations

    Science.gov (United States)

    Barhydt, Richard; Eischeid, Todd M.; Palmer, Michael T.; Wing, David J.

    2003-01-01

    NASA is currently investigating a new concept of operations for the National Airspace System, designed to improve capacity while maintaining or improving current levels of safety. This concept, known as Distributed Air/Ground Traffic Management (DAGTM), allows appropriately equipped autonomous aircraft to maneuver freely for flight optimization while resolving conflicts with other traffic and staying out of special use airspace and hazardous weather. In order to perform these tasks, pilots use prototype conflict detection, prevention, and resolution tools, collectively known as an Airborne Separation Assurance System (ASAS). While ASAS would normally allow pilots to resolve conflicts before they become hazardous, evaluation of system performance in sudden, near-term conflicts is needed in order to determine concept feasibility. An experiment was conducted in NASA Langley's Air Traffic Operations Lab to evaluate the prototype ASAS for enabling pilots to resolve near-term conflicts and examine possible operational effects associated with the use of lower separation minimums. Sixteen commercial airline pilots flew a total of 32 traffic scenarios that required them to use prototype ASAS tools to resolve close range pop-up conflicts. Required separation standards were set at either 3 or 5 NM lateral spacing, with 1000 ft vertical separation being used for both cases. Reducing the lateral separation from 5 to 3 NM did not appear to increase operational risk, as indicated by the proximity to the intruder aircraft. Pilots performed better when they followed tactical guidance cues provided by ASAS than when they didn't follow the guidance. In an effort to improve compliance rate, ASAS design changes are currently under consideration. Further studies will of evaluate these design changes and consider integration issues between ASAS and existing Airborne Collision Avoidance Systems (ACAS).

  10. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  11. The USNCR license renewal process

    International Nuclear Information System (INIS)

    Kuo, Pao-Tsin

    2002-01-01

    The US Congress promulgated a law in 1954, entitled 'Atomic Energy Act'. This Act states that operating licenses for commercial nuclear power plants are limited to a fixed term of 40 years, but they may be renewed for a period not to exceed 20 years. The terms were established mainly for economic considerations, not based on technical limitations. The U.S. Nuclear Regulatory Commission (USNRC) published the license renewal rule, Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), in December, 1991. The rule has since been amended in May, 1995. The underlying principle of the rule is that the regulatory process is adequate for ensuring safety of operating plants. The regulatory process includes NRC's issuance of Orders, Bulletins, Generic Letters, and Information Notices, as well as a number of special inspections in addition to the continuous oversight and routine inspection activities performed by on-site inspectors. Because of this comprehensive regulatory process, compilation of the current license basis or re-verification of the current licensing basis is not considered necessary for a license renewal review. The USNRC also determined on the basis of the findings of its research programs that active structures and components are well maintained by the existing programs. Therefore, the focus of the license renewal review is on passive, long-lived structures and components and on time-limited ageing analyses. The time-limited ageing analyses are for those structures and components which were originally designed to a 40 year service life

  12. Selective application of revised source terms to operating nuclear power plants

    International Nuclear Information System (INIS)

    Moon, Joo Hyun; Song, Jae Hyuk; Lee, Young Wook; Ko, Hyun Seok; Kang, Chang Sun

    2001-01-01

    More than 30 years later since 1962 when TID-14844 was promulgated, there has been big change of the US NRC's regulatory position in using accident source terms for radiological assessment following a design basis accident (DBA). To replace the instantaneous source terms of TID-14844, the time-dependent source terms of NUREG-1465 was published in 1995. In the meantime, the radiological acceptance criteria for reactor site evaluation in 10 CFR Part 100 were also revised. In particular, the concept of total effective dose equivalent has been incorporated in accordance with the radiation protection standards set forth in revised 10 CFR Part 20. Subsequently, the publication of Regulatory Guide 1.183 and the revision of Standard Review Plan 15.0.1 followed in 2000, which provided the licensee of operating nuclear power reactor with the acceptable guidance of applying the revised source term. The guidance allowed the holder of an operating license issued prior to January 10, 1997 to voluntarily revise the accident source terms used in the radiological consequence analyses of DBA. Regarding to its type of application, there suggested full and selective applications, Whether it is full or selective, based upon the scope and nature of associated plant modifications being proposed, the actual application of the revised source terms to an operating plant is expected to give a large impact on its facility design basis. Considering scope and cost of the analyses required for licensing, selective application is seemed to be more appealing to an licensee of the operating plant rather than full application. In this paper, hence, the selective application methodology is reviewed and is actally applied to the assessment of offsite radiological consequence following a LOCA at Ulchin Unit 3 and 4, in order to identify and analyze the potential impacts due to application of revised source terms and to assess the considerations taken in each application prior to its actual

  13. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  14. Long term operation of nuclear power plants in Spain: preparing for the future

    Energy Technology Data Exchange (ETDEWEB)

    Marcelles, I.; Frutos, E.; Jardi, X.; Cosgaya, F., E-mail: imarcelles@tecnatom.es [Tecnatom, S. A., Av. Montes de Oca 1, 28703 San Sebastian de los Reyes, Madrid (Spain)

    2017-09-15

    The Spanish nuclear industry is preparing for the Long Term Operation (LTO) of its complete fleet. Therefore, an important number of activities are being currently developed in order to achieve the safe and economical life extension of the operational life of the Spanish nuclear power plants. This paper describes the main activities that will be performed to meet the licensing requirements, in order to be granted and operating license for LTO, such as the development of Ageing Management Plans (Amp), Time Limited Ageing Analysis (TLAA) as well as databases and software tools to support LTO. In addition to this, this paper will describe the implementation of the NDE activities included in the AMPs and some of the research and development programs that the Spanish nuclear industry research is working on related to LTO (e.g. cable ageing, concrete degradation, etc.) (Author)

  15. Long term operation of nuclear power plants in Spain: preparing for the future

    International Nuclear Information System (INIS)

    Marcelles, I.; Frutos, E.; Jardi, X.; Cosgaya, F.

    2017-09-01

    The Spanish nuclear industry is preparing for the Long Term Operation (LTO) of its complete fleet. Therefore, an important number of activities are being currently developed in order to achieve the safe and economical life extension of the operational life of the Spanish nuclear power plants. This paper describes the main activities that will be performed to meet the licensing requirements, in order to be granted and operating license for LTO, such as the development of Ageing Management Plans (Amp), Time Limited Ageing Analysis (TLAA) as well as databases and software tools to support LTO. In addition to this, this paper will describe the implementation of the NDE activities included in the AMPs and some of the research and development programs that the Spanish nuclear industry research is working on related to LTO (e.g. cable ageing, concrete degradation, etc.) (Author)

  16. Simulator training and licensing examination for nuclear power station operator

    International Nuclear Information System (INIS)

    Xu Pingsheng

    2007-01-01

    For the recruitment, training and position qualification of the simulator instructors and feedback of training effect, the management approaches are formulated in 'The System for Simulator Training and Licensing Examination of Daya Bay Nuclear Power Station Operators'. The concrete requirements on the professional knowledge, work experience and foreign language ability of a simulator instructor are put forward. The process of instructor training is designed. The training items include the trainer training, pedagogy training, time management training, operation activities training during outage of unit, 'shadow' training and on-the-jot training on simulator courses. Job rotation is realized between simulator instructor and licensing personnel on site. New simulator instructor must pass the qualification identification. After a duration of 2 years, re-qualification has to be carried out. On the basis of the operator training method introduced from EDF (electricite De France), some new courses are developed and the improvement on the initial training, retaining courses, the technical support and the experience feedback by using the simulator is done also. (authors)

  17. 78 FR 46255 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction

    Science.gov (United States)

    2013-07-31

    ... Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction AGENCY: Nuclear... nuclear power plant. Compliance with the provisions of the rule is required by June 20, 2014. This... environmental effect of renewing the operating license of a nuclear power plant. This document is necessary to...

  18. Guide to the selection, training, and licensing or certification of reprocessing plant operators. Volume I

    International Nuclear Information System (INIS)

    1976-06-01

    The Code of Federal Regulations, Title 10, Part 55, establishes procedures and criteria for the licensing of operators, including senior operators, in ''Production and Utilization Facilities'', which includes plants for reprocessing irradiated fuel. A training guide is presented which will facilitate the licensing of operators for nuclear reprocessing plants by offering generalized descriptions of the basic principles (theory) and the unit operations (mechanics) employed in reprocessing spent fuels. In the present volume, details about the portions of a training program that are of major interest to management are presented

  19. Guide to the selection, training, and licensing or certification of reprocessing plant operators. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-06-01

    The Code of Federal Regulations, Title 10, Part 55, establishes procedures and criteria for the licensing of operators, including senior operators, in ''Production and Utilization Facilities'', which includes plants for reprocessing irradiated fuel. A training guide is presented which will facilitate the licensing of operators for nuclear reprocessing plants by offering generalized descriptions of the basic principles (theory) and the unit operations (mechanics) employed in reprocessing spent fuels. In the present volume, details about the portions of a training program that are of major interest to management are presented. (JSR)

  20. Recruitment training and licensing of operating personnel for nuclear power plants

    International Nuclear Information System (INIS)

    Palabrica, R.J.

    1979-01-01

    This article covers the step-by-step and most rigid recruitment, training, and licensing procedures undertaken in the selection for personnel involved in nuclear power plant operations. These procedures are true to all countries. However, for developing countries such as the Philippines, a bachelor's degree may be required as compared with the U.S. wherein a high school diploma is the minimum requirement. Because of the complexity of a nuclear facility, the work will require highly capable individuals with mature judgement who can render correct decisions even under highly stressed conditions. Thus during the selection and recruitment of applicants for the operator position, they are not only given aptitude tests but are also subjected to a series of psychological examintions. Once they are accepted, they are made to undergo a comprehensive and in-depth training to ensure that they will be capable of operating the nuclear power plant safely and effectively. Finally, those prospective operators have to pass licensing examinations in order to prove their competence and skills. Retraining programs follow after their training to maintain their skills. (RTD)

  1. 77 FR 7613 - Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108

    Science.gov (United States)

    2012-02-13

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-264; NRC-2012-0026] Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108 AGENCY: Nuclear Regulatory Commission... Facility Operating License No. R-108 (``Application''), which currently authorizes the Dow Chemical Company...

  2. Near-Term Actions to Address Long-Term Climate Risk

    Science.gov (United States)

    Lempert, R. J.

    2014-12-01

    Addressing climate change requires effective long-term policy making, which occurs when reflecting on potential events decades or more in the future causes policy makers to choose near-term actions different than those they would otherwise pursue. Contrary to some expectations, policy makers do sometimes make such long-term decisions, but not as commonly and successfully as climate change may require. In recent years however, the new capabilities of analytic decision support tools, combined with improved understanding of cognitive and organizational behaviors, has significantly improved the methods available for organizations to manage longer-term climate risks. In particular, these tools allow decision makers to understand what near-term actions consistently contribute to achieving both short- and long-term societal goals, even in the face of deep uncertainty regarding the long-term future. This talk will describe applications of these approaches for infrastructure, water, and flood risk management planning, as well as studies of how near-term choices about policy architectures can affect long-term greenhouse gas emission reduction pathways.

  3. Assessment of specialized educational programs for licensed nuclear reactor operators

    International Nuclear Information System (INIS)

    Melber, B.D.; Saari, L.M.; White, A.S.; Geisendorfer, C.L.; Huenefeld, J.C.

    1986-02-01

    This report assesses the job-relatedness of specialized educational programs for licensed nuclear reactor operators. The approach used involved systematically comparing the curriculum of specialized educational programs for college credit, to academic knowledge identified as necessary for carrying out the jobs of licenses reactor operators. A sample of eight programs, including A.S. degree, B.S. degree, and coursework programs were studied. Subject matter experts in the field of nuclear operations curriculum and training determined the extent to which individual program curricula covered the identified job-related academic knowledge. The major conclusions of the report are: There is a great deal of variation among individual programs, ranging from coverage of 15% to 65% of the job-related academic knowledge. Four schools cover at least half, and four schools cover less than one-third of this knowledge content; There is no systematic difference in the job-relatedness of the different types of specialized educational programs, A.S. degree, B.S. degree, and coursework; and Traditional B.S. degree programs in nuclear engineering cover as much job-related knowledge (about one-half of this knowledge content) as most of the specialized educational programs

  4. Developing hydrogen infrastructure through near-term intermediate technology

    International Nuclear Information System (INIS)

    Arthur, D.M.; Checkel, M.D.; Koch, C.R.

    2003-01-01

    The development of a vehicular hydrogen fuelling infrastructure is a necessary first step towards the widespread use of hydrogen-powered vehicles. This paper proposes the case for using a near-term, intermediate technology to stimulate and support the development of that infrastructure. 'Dynamic Hydrogen Multifuel' (DHM) is an engine control and fuel system technology that uses flexible blending of hydrogen and another fuel to optimize emissions and overall fuel economy in a spark ignition engine. DHM vehicles can enhance emissions and fuel economy using techniques such as cold-starting or idling on pure hydrogen. Blending hydrogen can extend lean operation and exhaust gas recirculation limits while normal engine power and vehicle range can be maintained by the conventional fuel. Essentially DHM vehicles are a near-term intermediate technology which provides significant emissions benefits in a vehicle which is sufficiently economical, practical and familiar to achieve significant production numbers and significant fuel station load. The factors leading to successful implementation of current hydrogen filling stations must also be understood if the infrastructure is to be developed further. The paper discusses important lessons on the development of alternative fuel infrastructure that have been learned from natural gas; why were natural gas vehicle conversions largely successful in Argentina while failing in Canada and New Zealand? What ideas can be distilled from the previous successes and failures of the attempted introduction of a new vehicle fuel? It is proposed that hydrogen infrastructure can be developed by introducing a catalytic, near-term technology to provide fuel station demand and operating experience. However, it is imperative to understand the lessons of historic failures and present successes. (author)

  5. AP1000R licensing and deployment in the United States

    International Nuclear Information System (INIS)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L.

    2012-01-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed

  6. Ignalina plant licensing process, international co-operation and assistance

    International Nuclear Information System (INIS)

    Bystedt, P.

    1999-01-01

    The challenge for Lithuania as a country with regained independence was to perform a licensing review in a way never done before in the country and in a time schedule that was extremely short. The work included establishing of the licensing base, strengthening the regulatory authority and organising the technical support, establish and implement a safety improvement program, production of the safety case and review of the safety case, and to derive a conclusion regarding whether to issue a licence or not. This was to be done together with other tasks, such as implementation of modifications included in the safety improvement programme at Ignalina, implementation of a new storage for spent fuel and, most important of all, to manage the operational safety at the plant. The achievements are impressive seen in view of the point of start and in view of the time and resources that have been available. Lithuania has put forward a unique safety documentation of an RBMK reactor and presented an in-depth safety evaluation in full openness to Western experts, giving the unique possibility to compare the safety of the Ignalina reactors to Western standards. The co-operation that has been established between Lithuania and Western experts through different assistance programmes is of outmost value, for all involved parties. Co-operation should continue as one element of the challenges for the future

  7. Overview of plant life management for long term operation in nuclear power plants

    International Nuclear Information System (INIS)

    Kang, K.S.; Vincze, P.; Bychkov, A.

    2014-01-01

    Many IAEA member states have given high priority to licensing their nuclear power plants to operate for terms longer than the time frame originally anticipated (generally 40 years). The task of managing plant ageing is assigned in most member states to an engineering specialty called 'plant life management' (PLiM) applying a systematic analysis methodology to System Structure Components (SSCs) ageing. In many countries, the safety performance of nuclear power plants is periodically assessed and characterized via the periodic safety review (PSR) process. Regulatory review and acceptance of PSRs constitutes for these countries the licensing requirement for continued operation of the plant to the following PSR cycle (usually 10 years). In the USA and in other countries operating US designed plants, instead of PSR process, a license renewal application (LRA) process is followed, which requires certain prerequisites such as ageing management programs, particularly for passive irreplaceable SSCs. Active components are normally addressed via the maintenance rule (MR) requirements and other established regulatory processes. A third group of member states have adopted a combined approach that incorporates elements of both the PSR process and selected LRA specific requirements, such as time limited ageing analysis. The article ends with some IAEA recommendations for the implementation of national PLiM programs

  8. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  9. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  10. Plant life time management for safe long term operation

    International Nuclear Information System (INIS)

    Burket, Danes

    2010-01-01

    The topics discussed include LTO (long-term operation) and licensing procedure in general and specifically for the Dukovany NPP, components of an LTO programme, the PLIM (plant life management) concept for Dukovany and Temelin, the LTO implementation project for Dukovany, LTO strategy, LTO risk study, international verification. The Conclusions include the following items: (i) Technical-economic study of Dukovany NPP LTO demonstrates technical feasibility and economic profitability of Dukovany NPP LTO with perspective for up to 60 years of operation. (ii) Safety part of Program for assurance of Dukovany NPP LTO complies with IAEA SALTO recommendations. (iii) Dukovany NPP LTO programme incorporated IAEA SALTO Peer Review Mission recommendations. (iv) LTO Implementation Project for 2009-2015 was approved with major targets to renew operational permission and prepare NPP for operation up to 60 years. (v) Preparation of Temelin NPP LTO programme has been started. (P.A.)

  11. An Organizational-Technical Concept to Deal with Open Source Software License Terms

    Directory of Open Access Journals (Sweden)

    Sergius Dyck

    2016-06-01

    Full Text Available Open source software (OSS released under various license terms is widely used as third party libraries in today's software projects. To ensure open source compliance within an organization, a strategic approach to OSS management is needed. As basis for such an approach, we introduce an organizational-technical concept for dealing with the various OSS licenses by using procedural instructions and build automation software. The concept includes the careful consideration of OSS license conditions. The results obtained from this consideration and additional necessary commitments are documented in a so-called license playbook. We introduce procedure instructions enabling a consistent approach for software development using OSS libraries. The procedure instructions are described in a way such that they can be implemented for example for Java projects using the popular build automation tool Apache Maven and the software repository tool Nexus. We give guidance on how to realize such an implementation on basis of automation tools in practice.

  12. 78 FR 37281 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses

    Science.gov (United States)

    2013-06-20

    ... factors: (1) License renewal will involve nuclear power plants for which the environmental impacts of...) Changes in the environment around nuclear power plants are gradual and predictable. The 1996 GEIS improved... environmental impacts that may occur from renewing commercial nuclear power plant operating licenses; (2...

  13. Community engagement as conflict prevention: Understanding the social license to operate

    Science.gov (United States)

    Knih, Dejana

    This thesis examines community engagement as a form of conflict prevention in order to obtain the social license to operate (SLO) in Alberta's oil and gas industry. It does this by answering the question: what are the key elements of the Social License to Operate and how can these elements be applied to community engagement/consultation in a way that prevents conflicts in Alberta's oil and gas industry? The underlying assumption of this thesis is that building good relationships and working collaboratively functions as a form of conflict prevention and that this in turn leads to the SLO. This thesis outlines the key features of both successful community engagement and of the SLO, to provide a guideline for what is needed to obtain the SLO. Data was collected from semi-structured interviews and through a literature review. The data analysis concluded that there are direct parallels between the key elements of effective community engagement and the key elements of the SLO as identified in the interviews. These parallels are: knowing the community, addressing community needs, corporate social responsibility, relationship building, follow through and evidence for what has been done, executive buy-in, excellent communication, and open dialogue, all within a process which is principled (there is trust, understanding, transparency and respect), inclusive, dynamic, flexible, ongoing, and long-term. Moreover, the key elements of effective community engagement and of the SLO identified in the interviews also overlapped with those found in the literature review, with only one exception. The literature review explicitly named early involvement as a key element of both effective community engagement and the SLO, whereas the interview participants only explicitly indicated it as a key factor of community engagement and implied it to be a key element of the SLO.

  14. Licensing Support Experience of the BN-600 Operation

    International Nuclear Information System (INIS)

    Khrennikov, N.; Sintsov, A.

    2013-01-01

    License procedure - Main principle: • All works, including fatigue tests of new types of fuel, are carried out at the unit 3 Beloyarsk nuclear power plants with the BN-600 reactor with the justification of the regulatory body. • Justification procedure is standard for all power units and independent from the reactor types. • The regulatory body and independent experts or technical support organizations, which can be involved in this work by the regulatory body, review SAR, operational manuals and other operator documents. • Safety requirements (i.e. Federal rules and codes). The project and design documents shall meet safety requirements. • The technical and organizational measures for safety guarantee shall meet well-known results of the research investigations or shall be experimental validate

  15. WIPP - Pre-Licensing and Operations: Developer and Regulator Perspectives

    International Nuclear Information System (INIS)

    Peake, Tom; Patterson, R.

    2014-01-01

    The Waste Isolation Pilot Plant (WIPP) is a disposal system for defense-related transuranic (TRU) radioactive waste. Developed by the Department of Energy (DOE), WIPP is located in Southeastern New Mexico: radioactive waste is disposed of 2,150 feet underground in an ancient layer of salt with a total capacity of 6.2 million cubic feet of waste. Congress authorized the development and construction of WIPP in 1980 for the express purpose of providing a research and development facility to demonstrate the safe disposal of radioactive wastes resulting from the defense activities and programs of the United States. This paper makes a historical review of the site development, site operations (waste disposal operations started in 1999), communications between US EPA and DOE, the chronology of pre-licensing and pre-operations, the operational phase and the regulatory challenges, and the lessons learned after 12 years of operations

  16. Technological evaluation for the extension of the operation license to the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Arganis J, C. R.; Medina A, A. L.

    2010-01-01

    At the present time one of the tendencies in the nuclear industry is the renovation of operation licenses of the nuclear power plants, with the purpose of prolonging their operation 20 years more than the time settled down in their original license, which is of 30 years for the case of the nuclear power plant of Laguna Verde. This allows the electric power generation for a major period of time and to a relatively low price, giving this way a bigger competitiveness to the power stations of nuclear power. However, to request the license extension of the nuclear power plant requires to get ready the documentation and necessary studies for: to maintain a high level of security, to optimize the operation, maintenance and service life of the structures, systems and components, to maintain an acceptable level of performance, to maximize the recovery of the investment about the service of the nuclear power plant and to preserve the sure conditions for a major operation period at the license time. This paper describes the studies conducted by the Materials Technology Department of the Instituto Nacional de Investigaciones Nucleares (ININ) to substantiate the required documentation for obtaining the extension of operating license of the nuclear power plant. These studies are focused mainly in the reactor pressure vessels of both units, as well as in the deposit of noble metals and the influence of the sludges (crud s) in this deposit. (Author)

  17. The end game must end before license renewal begins

    International Nuclear Information System (INIS)

    Allen, S.R.; Edwards, D.W.

    1995-01-01

    The quest for a process and strategy to achieve license renewal was begun in the mid-1980s with the view that renewal was an imperative. A major portion of the nation's future electric supply seemed to be at stake. For plants who were becoming noncompetitive because of annual capital recovery, license renewal also appeared as the means of survival. These two perceptions led to a third: License renewal should be sought immediately upon completion of the first 20 yr of operation. Although the basic engineering premise of license renewal remains sound, the perceptions regarding timing of an application may be incorrect. This paper suggests that a gauntlet of uncertainty exists for all plants. Further, it is most severe between the 20th and 30th years of operation. Thus, the competitive viability of the plant must be sustained for most of the initial term before license renewal can become a serious option

  18. Environmental assessment for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    The Atomic Energy Act and Nuclear Regulatory Commission (NRC) regulations provide for the renewal of nuclear power plant operating licenses beyond their initial 40-year term. The Act and NRC regulations, however, do not specify the procedures, criteria, and standards that must be satisfied in order to renew a license. The NRC is promulgating a rule (10 CFR Part 54) to codify such requirements prior to the receipt of applications for license renewal. The NRC has assessed the possible environmental effects of promulgating requirements in 10 CFR Part 54 now rather than employing such requirements in an ad hoc manner in individual licensing actions. The final part 54 rule requires the development of information and analyses to identify aging problems of systems, structures, and components unique to license renewal that will be of concern during the period of extended operation and will not be controlled by existing effective programs. In general, licensee activities for license renewal may involve replacement, refurbishment, inspection, testing, or monitoring. Such actions will be generally be within the range of similar actions taken for plants during the initial operating term. These actions would be primarily confined within the plants with potential for only minor disruption to the environment. It is unlikely that these actions would change the operating conditions of plants in ways that would change the environmental effects already being experienced. Relicensing under existing regulations would also be primarily focused on aging degradation and would likely result in requirements similar to those that will result from relicensing under the final rule

  19. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  20. Selection, training, qualification and licensing of Three Mile Island reactor operating personnel

    International Nuclear Information System (INIS)

    Eytchison, R.M.

    1980-01-01

    The various programs which were intended to staff Three Mile Island with competent, trained operators and supervisors are reviewed. The analysis includes a review of the regulations concerning operator training and licensing, and describes how the requirements were implemented by the NRC, Metropolitan Edison Company, and Babcock and Wilcox Company. Finally the programs conducted by these three organisations are evaluated. (U.K.)

  1. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  2. Answers to questions at public meetings regarding implementation of Title 10, Code of Federal Regulations, Part 55 on operators' licenses

    International Nuclear Information System (INIS)

    1987-11-01

    This document presents questions and answers based on the transcripts of four public meetings (and from written questions submitted after the meetings) conducted from April 9 to April 20, 1987 by the staff of the US Nuclear Regulatory Commission. The meetings discussed implementation of the Commission's final rule governing Operators' Licenses and Conforming Amendments (10 CFR Parts 55 and 50). The rule became effective May 26, 1987 and is intended to clarify the regulations for issuing licenses to operators and senior operators; revise the requirements and scope of written examinations and operating tests for operators and senior operators, require a simulation facility; clarify procedures for administering requalification examinations; and describe the form and content for operator license applications

  3. Emergency preparedness source term development for the Office of Nuclear Material Safety and Safeguards-Licensed Facilities

    International Nuclear Information System (INIS)

    Sutter, S.L.; Mishima, J.; Ballinger, M.Y.; Lindsey, C.G.

    1984-08-01

    In order to establish requirements for emergency preparedness plans at facilities licensed by the Office of Nuclear Materials Safety and Safeguards, the Nuclear Regulatory Commission (NRC) needs to develop source terms (the amount of material made airborne) in accidents. These source terms are used to estimate the potential public doses from the events, which, in turn, will be used to judge whether emergency preparedness plans are needed for a particular type of facility. Pacific Northwest Laboratory is providing the NRC with source terms by developing several accident scenarios for eleven types of fuel cycle and by-product operations. Several scenarios are developed for each operation, leading to the identification of the maximum release considered for emergency preparedness planning (MREPP) scenario. The MREPP scenarios postulated were of three types: fire, tornado, and criticality. Fire was significant at oxide fuel fabrication, UF 6 production, radiopharmaceutical manufacturing, radiopharmacy, sealed source manufacturing, waste warehousing, and university research and development facilities. Tornadoes were MREPP events for uranium mills and plutonium contaminated facilities, and criticalities were significant at nonoxide fuel fabrication and nuclear research and development facilities. Techniques for adjusting the MREPP release to different facilities are also described

  4. 78 FR 40519 - Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving...

    Science.gov (United States)

    2013-07-05

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-298; NRC-2013-0139] Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards..., issued to Nebraska Public Power District (the licensee), for operation of the Cooper Nuclear Station (CNS...

  5. Final Safety Evaluation Report to license the construction and operation of a facility to receive, store, and dispose of 11e.(2) byproduct material near Clive, Utah (Docket No. 40-8989)

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The Final Safety Evaluation Report (FSER) summarizes the US Nuclear Regulatory Commission (NRC) staff`s review of Envirocare of Utah, Inc.`s (Envirocare`s) application for a license to receive, store, and dispose of uranium and thorium byproduct material (as defined in Section 11e.(2) of the Atomic Energy Act of 1954, as amended) at a site near Clive, Utah. Envirocare proposes to dispose of high-volume, low-activity Section 11e.(2) byproduct material in separate earthen disposal cells on a site where the applicant currently disposes of naturally occurring radioactive material (NORM), low-level waste, and mixed waste under license by the Utah Department of Environmental Quality. The NRC staff review of the December 23, 1991, license application, as revised by page changes dated July 2 and August 10, 1992, April 5, 7, and 10, 1993, and May 3, 6, 7, 11, and 21, 1993, has identified open issues in geotechnical engineering, water resources protection, radon attenuation, financial assurance, and radiological safety. The NRC will not issue a license for the proposed action until Envirocare adequately resolves these open issues.

  6. Final Safety Evaluation Report to license the construction and operation of a facility to receive, store, and dispose of 11e.(2) byproduct material near Clive, Utah (Docket No. 40-8989)

    International Nuclear Information System (INIS)

    1994-01-01

    The Final Safety Evaluation Report (FSER) summarizes the US Nuclear Regulatory Commission (NRC) staff's review of Envirocare of Utah, Inc.'s (Envirocare's) application for a license to receive, store, and dispose of uranium and thorium byproduct material (as defined in Section 11e.(2) of the Atomic Energy Act of 1954, as amended) at a site near Clive, Utah. Envirocare proposes to dispose of high-volume, low-activity Section 11e.(2) byproduct material in separate earthen disposal cells on a site where the applicant currently disposes of naturally occurring radioactive material (NORM), low-level waste, and mixed waste under license by the Utah Department of Environmental Quality. The NRC staff review of the December 23, 1991, license application, as revised by page changes dated July 2 and August 10, 1992, April 5, 7, and 10, 1993, and May 3, 6, 7, 11, and 21, 1993, has identified open issues in geotechnical engineering, water resources protection, radon attenuation, financial assurance, and radiological safety. The NRC will not issue a license for the proposed action until Envirocare adequately resolves these open issues

  7. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation of internal transmitter control... Transmitter Control Internal Transmitter Control Systems § 90.473 Operation of internal transmitter control systems through licensed fixed control points. An internal transmitter control system may be operated...

  8. Developing indigenous safeguards capabilities within the MPC ampersand A program: A transition from near-term upgrades to long-term sustainability

    International Nuclear Information System (INIS)

    Robinson, P.W.; Leutters, F.O.; Horton, R.D.; Soo Hoo, M.S.

    1997-01-01

    Approximately five years ago, the United States and countries of ampersand Former Soviet Union (FSU) started the Cooperative Threat Reduction program. The program's purpose was to accelerate reduction of the risk of nuclear proliferation, including such threats as theft, diversion, and unauthorized possession of nuclear materials. This goal would be accomplished through near-term upgrades to strengthen the nuclear material protection, control, and accounting systems within the FSU countries. In addition to this near-term goal, a long-term goal of the U.S. Department of Energy's (DOE) Material Protection, Control, and Accounting (MPC ampersand A) program is to promote a new safeguards culture and to support the establishment of a sustaining MPC ampersand A infrastructure in the FSU. This long-term goal is vital to assuring that the near-term upgrades remain effective for safeguarding nuclear material as these countries experience political and social changes. The MPC ampersand A program is managed by DOE's Russia/Newly Independent States (NIS) Nuclear Materials Security Task Force. A coordinated effort is underway to promote and to help establish a new safeguards culture and a sustaining infrastructure. Elements being implemented at both the national and site levels include system operational performance evaluations, development of MPC ampersand A training, operational procedures, national MPC ampersand A regulations, and adaptation of modern MPC ampersand A methodologies to suit the conditions in the FSU countries. This paper identifies current efforts in several countries that are undergoing transition from near-term upgrades to sustainable MPC ampersand A systems

  9. Aging management review for license renewal and plant life management

    International Nuclear Information System (INIS)

    Rinckel, M.A.; Young, G.G.

    2002-01-01

    Full text: United States nuclear power plants are initially licensed for a period of 40-years. The 40-year term, which was established by the Atomic Energy Commission in the 1950s, is believed to be based on engineering judgement and is consistent with the typical amortization schedule for purchasing fossil power plants. Under 10 CFR Part 54, the license renewal rule, additional terms of 20-years may be obtained through the preparation of a license renewal application that must be reviewed and approved by the Nuclear Regulatory Commission (NRC). The license renewal rule requires that applicants perform ageing management reviews on passive long-lived structures and components to demonstrate that ageing will be managed during the period of extended operation (i.e., additional 20 years of operation). ageing of active components, which are excluded from 10 CFR Part 54, is accomplished through the Maintenance Rule, 10 CFR Part 65, using performance-based monitoring. The license renewal rule, 10 CFR Part 54, was initially published in 1991. After significant interaction with the nuclear industry from 1991 through 1994, the NRC revised the rule in 1995 to focus on passive long-lived structures and components. In 1998, the first two applications for license renewal were submitted to the NRC by Baltimore Gas and Electric for the two-unit Calvert Cliffs nuclear power plant and by Duke Energy for the three-unit Oconee nuclear power plant. In March 2000, the NRC approved the application for the two-unit Calvert Cliffs nuclear power plant for an additional 20 years. Two months later, the NRC approved the renewal of the operating licenses for the three-unit Oconee nuclear station. The NRC completed these reviews in a timely, predictable, and stable manner. As of February 2002, the NRC has approved renewal of operating licenses for eight nuclear units and has applications under review for 15 more units. Twelve additional companies have notified the NRC of their intention to seek

  10. The intelligent customer: considerations around build-own-operate business and licensing models for small modular reactors in Canada

    International Nuclear Information System (INIS)

    Jones, K.

    2014-01-01

    An organization planning a proposal for a build-own-operate business model needs to address expanded licensee responsibilities under this model, associated regulatory impacts and how this affects their role as an 'intelligent customer'. This is particularly important for cases where builder-owner-operators plan to manufacture factory-fuelled designs and ship them to a site for installation and operation. The primary responsibility for safe conduct of licensed activities rests with the licensee. A build-own-operate model expands the scope of licensed activities to include design, manufacturing, transport, construction, and operation. The licensee must be able to demonstrate they are qualified to conduct all licensed activities including sufficient competent resources within the licensee's organization to oversee('Intelligent Customer') any work it commissions externally and the subsequent flow down through of the supply chain. This paper examines aspects that organizations need to assess the suitability of approaches that it may take to maintain in-house expertise for the control and oversight of licensed activities at all times. It considers the approach to identification of: core capabilities the licensee would need to understand its safety case under a build-own-operate model to manage licensed activities in accordance with requirements under the Nuclear Safety and Control Acta licensee's 'intelligent customer' capabilities in particular around understanding, specifying, overseeing and accepting work undertaken on its behalf by contractors. While this paper is focused on small modular reactors, being an intelligent customer applies to large commercial or research reactors equally; the size of reactor is immaterial.

  11. The intelligent customer: considerations around build-own-operate business and licensing models for small modular reactors in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Jones, K., E-mail: kenneth.jones@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada)

    2014-07-01

    An organization planning a proposal for a build-own-operate business model needs to address expanded licensee responsibilities under this model, associated regulatory impacts and how this affects their role as an 'intelligent customer'. This is particularly important for cases where builder-owner-operators plan to manufacture factory-fuelled designs and ship them to a site for installation and operation. The primary responsibility for safe conduct of licensed activities rests with the licensee. A build-own-operate model expands the scope of licensed activities to include design, manufacturing, transport, construction, and operation. The licensee must be able to demonstrate they are qualified to conduct all licensed activities including sufficient competent resources within the licensee's organization to oversee('Intelligent Customer') any work it commissions externally and the subsequent flow down through of the supply chain. This paper examines aspects that organizations need to assess the suitability of approaches that it may take to maintain in-house expertise for the control and oversight of licensed activities at all times. It considers the approach to identification of: core capabilities the licensee would need to understand its safety case under a build-own-operate model to manage licensed activities in accordance with requirements under the Nuclear Safety and Control Acta licensee's 'intelligent customer' capabilities in particular around understanding, specifying, overseeing and accepting work undertaken on its behalf by contractors. While this paper is focused on small modular reactors, being an intelligent customer applies to large commercial or research reactors equally; the size of reactor is immaterial.

  12. Establishment of regulatory framework for the development reactor licensing

    International Nuclear Information System (INIS)

    Jo, Jong C.; Yune, Young G.; Kim, Woong S.; Ahn, Sang K.; Kim, In G.; Kim, Hho J.

    2003-01-01

    With a trend that various types of advanced reactor designs are currently under development worldwide, the Korea Atomic Energy Research Institute has been developing an advanced reactor called ' System-integrated Modular Advanced Reactor (SMART)', which is a small sized integral type pressurized water reactor with a rated thermal power of 330 MW. To demonstrate the safety and the performance of the SMART reactor design, the SMART Research and Development Center has embarked to build a scaled-down pilot plant of SMART, called 'SMART-P' with a rated thermal power of 65 MW. In preparation for the forthcoming applications for both construction permit and operating license of SMART-P in the near future, the Korea Institute of Nuclear Safety is developing a new regulatory framework for licensing review of such a development reactor, which covers establishment of licensing process, identification and resolution of technical and safety issues, development of regulatory evaluation or verification-purpose computer codes and analytical methods, and establishment of design-specific, general design and operating criteria, regulations, and associated regulatory guides. This paper presents the current activities for establishing a regulatory framework for the licensing of a research and development reactor. Discussions are made on the SMART-P development program, the current Korean regulatory framework for reactor licensing, the SMART-P licensing-related issues, and the approach and strategy for developing an effective regulatory framework for the SMART-P licensing

  13. Licensing decisions and safety research related to LMFBR accidents

    International Nuclear Information System (INIS)

    Denise, R.P.; Speis, T.P.; Kelber, C.N.; Curtis, R.T.

    1977-01-01

    The licensing approach which ensures adequate protection of the public health and safety against serious accidents is described. This paper describes the role of core melt and core disruptive accidents in the design, safety research, and licensing processes, using the Clinch River Breeder Reactor (CRBR) as a focal point. Major design attention is placed on the prevention of these accidents so that the probability of core melt accidents is reduced to a sufficiently low level that they are not treated as design basis accidents. Additional requirements are placed upon the design to further reduce residual risk. This licensing process is supported by a confirmatory research program designed to provide an independent basis for licensing judgements. It has as a goal the resolution of generic safety issues prior to the establishment of a commercial LMFBR industry. The program includes accident analysis, experiments in materials interactions, aerosol transport and system integrity and planning for new safety test facilities. The problems are approached in a multi-disciplinary functional manner that identifies key safety issues and centralizes efforts to resolve them. The near term objectives of the program support the licensing of the Clinch River Breeder Reactor (CRBR) and the proposed Prototype Large Breeder Reactor (PLBR). The long term objectives of the program support the licensing of commercial LMFBRs during the late 1980's and beyond. This safety research is designed to provide an independent basis for the licensing judgements which must be made by the Nuclear Regulatory Commission

  14. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  15. AP1000{sup R} licensing and deployment in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing

  16. Social license to operate: case from brazilian mining industry

    Science.gov (United States)

    Santiago, Ana Lúcia F.; Demajorovic, Jacques; Aledo, Antonio

    2015-04-01

    The approach of the Social License to Operate (SLO) emerges as an important element in academic discussions and business practices related to extractive industries. It appears that in productive activities with great potential to produce economic, social and environmental impacts, conventional approaches based on legal compliance no longer sufficient to legitimize the actions of companies and engagement stakeholders. Studies highlight the need of mining activities receiving a SLO "issued" by companies stakeholders, including society, government, non-governmental organizations, media and communities. However, local communities appears as major stakeholders in governance arrangements, by virtue of its proximity to extractive areas and ability to affect the company's results. Stakeholders with unmet expectations can generate conflicts and risks to the company, the knowledge of these expectations and an awareness of company managers of the importance of Social License to Operate (SLO), can generate strategies and mitigating actions to prevent and or minimize possible conflicts. The concept of SLO arises in engineering extractive industry, when you need to respond to social challenges, beyond the usual environmental challenges, technological and management. According to Franks and Cohen (2012) there is a tendency of engineering sectors, sustainability, environmental, safety and especially in risk mappings, treat the technological issues in a neutral manner, separating the technological research projects of social influences. I want to contribute to the advancement of the debate on stakeholder engagement and adopting as focus on the company's relationship with the community, the aim of this study was to understand how a social project held by one of the largest mining companies in Brazil contributed to the process of SLO. This methodological procedure adopted was a qualitative, descriptive, and exploratory interviews with the communities located in rural areas of direct

  17. Containment long-term operational integrity

    International Nuclear Information System (INIS)

    Sammataro, R.F.

    1990-01-01

    Periodic integrated leak rate tests are required to assure that containments continue to meet allowable leakage limits. Although overall performance has been quite good to date, several major containment aging and degradation mechanisms have been identified. Two pilot plant life extension (PLEX) studies serve as models for extending the operational integrity of present containments for light-water cooled nuclear power plants in the United States. One study is for a Boiling-Water Reactor (BWR) and the second is for a Pressurized-Water Reactor (PWR). Research and testing programs for determining the ultimate pressure capacity and failure mechanisms for containments under severe loading conditions and studies for extending the life of current plants beyond the present 40-year licensed lifetime are under way. This paper presents an overview of containment designs in the United States. Also presented are a discussion of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) and regulatory authority requirements for the design, construction, inservice inspection, leakage testing and repair of steel and concrete containments. Findings for containments from the pilot PLEX studies and continuing containment integrity research and testing programs are discussed. The ASME Code and regulatory requirements together with recommendations from the PLEX studies and containment integrity research and testing provide a basis for continued containment long-term operational integrity. (orig./GL)

  18. Retention of knowledge and experience from experts in near-term operating plants

    International Nuclear Information System (INIS)

    Jiang, H.

    2007-01-01

    Full text: Tianwan Nuclear Power Station (TNPS) will be put into commercial operation in May, 2007. Right-sizing is on the way to adapt the organization to the new stage of TNPS. TNPS is facing challenges of dilution of expertise by the rightsizing. This condition is aggravated by the incipient training system and a very competitive fighting for attracting technical experts in nuclear area, because the very ambitious projects of nuclear plants which are thriving in China. This can lead to the compromise of the capability to safely and economically operate TNPS. Indubitably, a personnel training plays a very crucial role in knowledge management, especially for countries as China which are weak in professional education system. Key knowledge and skills for safely and reliably operating nuclear power plants can be effectively identified by personnel training system developed in a systematic way and properly implemented. And only by sound and sufficient training can adequate number of replacements be produced. Well-developed IT platform can help the information management in such an era of information and internet. Information should be collected in a systematic way instead of stacking information on an ad hoc basis. But the project database must be established in an well-organized way, and the information should be aroused from sleeping, so that usable data will not be lost and are readily accessible on intranet and available to users. Or else the engineers take great pain to search for data like looking for a needle in a haystack, while useful data are gathering dust somewhere deep in the databank something. Compared to the well-developed industrial countries, there is quite a room in fundamental aspects which are cardinal requisites for effective knowledge management. These factors Contributing to Knowledge Management in Near-Term Operating Plants include not simply training and information management but also almost all other technical and management related to the

  19. FOSS License Selection and Code Management

    OpenAIRE

    Vescuso, Peter

    2011-01-01

    With nearly 2,000 free and open source software (FLOSS) licenses, software license proliferation¿ can be a major headache for software development organizations trying to speed development through software component reuse, as well as companies redistributing software packages as components of their products. Scope is one problem: from the Free Beer license to the GPL family of licenses to platform-specific licenses such as Apache and Eclipse, the number and variety of licenses make it difficu...

  20. CNRA/CSNI workshop on licensing and operating experience of computer-based I and C systems - Summary and conclusions

    International Nuclear Information System (INIS)

    2002-01-01

    The OECD Workshop on Licensing and Operating Experience of Computer-Based I and C Systems, was sponsored by both the Committee on Nuclear Regulatory Activities (CNRA) and the Committee on the Safety of Nuclear Installations (CSNI) of the OECD Nuclear Energy Agency (NEA). It was organised in collaboration with the Czech State Office for Nuclear Safety (SUJB), the Czech Power Board CEZ a.s., I and C Energo a.s. and the Nuclear Research Institute, Rez near Prague. The objectives of the Workshop were to exchange the experience gained by both the regulators and the industry in different countries in the licensing and operation of computer-based I and C systems, to discuss the existing differences in their licensing approaches in various countries, to consider the safety aspects of their practical use, and to discuss the ways of promoting future international co-operation in the given area. The scope of the Workshop included: - review of the progress made since the CNRA/CSNI workshop which was held in 1996 - current and future regulatory needs and/or requirements for the computer-based I and C systems - progress made in software life cycle activities, including verification and validation, and safety/hazards analysis - benefits of applying the computer-based I and C systems to improve plant performance and safety. The Technical Sessions and Discussion Sessions covered the following topics: Opening Session: Advances made in the use and planning of computer-based I and C systems; Topic 1: National and international standards and guides for computer-based safety systems; Topic 2: Regulatory aspects; Topic 3: Analysis and assessment of digital I and C systems; Topic 4: Software life cycle activities; Topic 4: Experience with applications, system aspects, potential limits and future trends and needs; Final Session: Workshop summary. The workshop provided a unique opportunity for people with experience in licensing, developing, manufacturing, implementing, maintaining or

  1. Comparison of the inspection practices in relation to the control room operator and shift supervisor licenses

    International Nuclear Information System (INIS)

    Aro, Ilari; Koizumi, Hiroyoshi; Manzella, Pietro

    1998-01-01

    The CNRA believes that safety inspections are a major element in the regulatory authority's efforts to ensure the safe operation of nuclear facilities. Considering the importance of these issues, the Committee has established a special Working Group on Inspection Practices (WGIP). The purpose of WGIP, is to facilitate the exchange of information and experience related to regulatory safety inspections between CNRA Member countries In 1996, members of WGIP discussed various ways in which regulatory inspectors look at and evaluate how licenses are given to control room operators and shift supervisors in the Member countries. As a result of these discussions it was proposed to put together a short comparison report on this issue. The CNRA approved work on this at its annual meeting that year. This CNRA/WGIP study concentrates on the regulatory inspection of control room operator competence and authorisation. As noted in the text, fourteen Member countries supplied input by responding to the questionnaire. This report presents a comparison of inspection practices in participating OECD countries relating to control room operator and shift supervisor licenses. The report has been derived from answers to a questionnaire on the basis of guidance given in Appendix 1.1 with the detailed answers being given in Appendix 1. Key questions for this comparison were 'What are the regulatory or licensee requirements for holding and up-keeping a license or authorisation' and 'How does the regulatory body inspect the training and competence of shift teams and individual operators'. The main conclusion from the comparison is that the general practice within the participating countries for ensuring the competence of operators is broadly similar although regulatory practices differ markedly. For example, the regulatory bodies in some countries are actively involved in the examination and licensing process of individual operators whereas other regulatory bodies

  2. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  3. How to ensure the safety of extended operations: Practice and experience of Paks NPP

    International Nuclear Information System (INIS)

    Kovacs, J.

    2005-01-01

    The Paks Nuclear Power Plant strategy is to extend the operational lifetime of the plant and renew the operational license for 20 years over the designed and licensed lifetime. In the paper the preconditions of long-term operation are discussed and the basic findings and experience of the license renewal works are also presented. The further plans fo NPP Paks for ensuring safe operation in long-term are discussed. (author)

  4. General aspects of radiological protection to consider for the licensing a hospital cyclotron

    International Nuclear Information System (INIS)

    Andrada Contardi, F.A.; Fruttero, N.H.; Bozzo, R.H.; Moschella, E.G.

    2010-01-01

    The use of PET/PET-CT studies for a variety of diagnoses has increased significantly on a global scale. Modern medical cyclotrons must be placed in or near hospitals on account of the short radioactive half-life of the pharmaceuticals used in such studies. Many countries in Latin America are now licensing cyclotrons and laboratories for the production of radio-pharmaceuticals for the first time, and most are expected to have installations within the near future. This report outlines the general aspects of radiological protection important to consideration during the licensing of these facilities, and includes the following: general operation of the cyclotron and laboratory for the production of radiopharmaceuticals, safety systems (shielding, interlocks, ventilation, manual safety systems, alarms and monitors), and general aspects for licensing an installation (monitoring, accidental and incidental events, activation of components, etc.) and personnel. (authors) [es

  5. Licensed operating reactors status summary report data as of January 31, 1989

    International Nuclear Information System (INIS)

    Schwartz, I.

    1989-03-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information, such as spent fuel storage capability, reactor years of experience, and non-power reactors in the United States

  6. Licensed operating reactors: status summary report, data as of May 31, 1982

    International Nuclear Information System (INIS)

    1982-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Licensed operating reactors: Status summary report, data as of 02-28-89

    International Nuclear Information System (INIS)

    1989-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactor Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  8. Licensed operating reactors status summary report, data as of December 31, 1988

    International Nuclear Information System (INIS)

    1989-02-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  9. Licensed operating reactors. Status summary report data as of October 31, 1982

    International Nuclear Information System (INIS)

    1982-11-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  10. Licensed operating reactors. Status summary report, data as of 8-31-82

    International Nuclear Information System (INIS)

    1982-09-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  11. Licensed operating reactors: Status summary report data as of 9-30-86

    International Nuclear Information System (INIS)

    1987-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices. IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  12. Licensed operating reactors: Status summary report, data as of 11-30-88

    International Nuclear Information System (INIS)

    1989-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information, such as spent fuel storage capability, reactor years of experience, and non-power reactors in the United States

  13. Licensed operating reactors: Status summary report, data as of 11-30-86

    International Nuclear Information System (INIS)

    1987-06-01

    The operating units status report - licensed operating reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  14. Licensed operating reactors: Status summary report, Data as of 08-31-86

    International Nuclear Information System (INIS)

    1987-03-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  15. Near term and long term materials issues and development needs for plasma interactive components

    International Nuclear Information System (INIS)

    Mattas, R.F.

    1986-01-01

    Plasma interactive components (PICs), including the first wall, limiter blades, divertor collector plates, halo scrapers, and RF launchers, are exposed to high particle fluxes that can result in high sputtering erosion rates and high heat fluxes. In addition, the materials in reactors are exposed to high neutron fluxes which will degrade the bulk properties. This severe environment will limit the materials and designs which can be used in fusion devices. In order to provide a reasonable degree of confidence that plasma interactive components will operate successfully, a comprehensive development program is needed. Materials research and development plays a key role in the successful development of PICs. The range of operating conditions along with a summary of the major issues for materials development is described. The areas covered include plasma/materials interactions, erosion/redeposition, baseline materials properties, fabrication, and irradiation damage effects. Candidate materials and materials development needs in the near term and long term are identified

  16. Licensing process for future applications of advanced-design nuclear reactors

    International Nuclear Information System (INIS)

    Miller, C.L.

    1990-01-01

    The existing 10CFR50 two-step licensing process in the Code of Federal Regulations can continue to be a viable licensing vehicle for future applications, at least for the near future. The US Nuclear Regulatory Commission (NRC) Commissioners and staff, the public, and the utilities (along with supporting architect/engineers and nuclear steam supply system vendors) have a vast body of experience and knowledge of the existing part 50 licensing process. All these participants are familiar with their respective roles in this process, and history shows this process to be a workable licensing vehicle. Nevertheless, the use of 10CFR52 should be encouraged for future applications. This proposed new rule is intended to achieve the early resolution of licensing issues, to reduce the complexity and uncertainty of the licensing process, and enhance the safety and reliability of nuclear power plants. Part 52's overall purpose is to improve reactor safety and streamline the licensing process by encouraging the use of standard reactor designs and by allowing the early resolution of site environmental and reactor safety issues. The public should be afforded an earlier entry into the licensing process as a result of design certification rulemaking process and combined construction permit/operating license hearings

  17. Status and near-term plans for DIII-D

    International Nuclear Information System (INIS)

    Davis, L.G.; Callis, R.W.; Luxon, J.L.; Stambaugh, R.D.

    1987-10-01

    The DIII-D tokamak at GA Technologies began plasma operation in February of 1986 and is dedicated to the study of highly non-circular plasmas. High beta operation with enhanced energy confinement is paramount among the goals of the DIII-D research program. Commissioning of the device and facility has verified the design capability including coil and vessel loading, volt-second consumption, bakeout temperature, vessel armor, and neutral beamline thermal integrity and control systems performance. Initial experimental results demonstrate the DIII-D is capable of attaining high confinement (H-mode) discharges in a divertor configuration using modest neutral beam heating or ECH. Record values of I/sub p/aB/sub T/ have been achieved with ohmic heating as a first step toward operation at high values of toroidal beta and record values of beta have been achieved using neutral beam heating. This paper summarizes results to date and gives the near term plans for the facility. 13 refs., 6 figs., 1 tab

  18. AREVA HTR concept for near-term deployment

    Energy Technology Data Exchange (ETDEWEB)

    Lommers, L.J., E-mail: lewis.lommers@areva.com [AREVA Inc., 2101 Horn Rapids Road, Richland, WA 99354 (United States); Shahrokhi, F. [AREVA Inc., Lynchburg, VA (United States); Mayer, J.A. [AREVA Inc., Marlborough, MA (United States); Southworth, F.H. [AREVA Inc., Lynchburg, VA (United States)

    2012-10-15

    This paper introduces AREVA's High Temperature Reactor (HTR) steam cycle concept for near-term industrial deployment. Today, nuclear power primarily impacts only electricity generation. The process heat and transportation fuel sectors are completely dependent on fossil fuels. In order to impact this energy sector as rapidly as possible, AREVA has focused its HTR development effort on the steam cycle HTR concept. This reduces near-term development risk and minimizes the delay before a useful contribution to this sector of the energy economy can be realized. It also provides a stepping stone to longer term very high temperature concepts which might serve additional markets. A general description of the current AREVA steam cycle HTR concept is provided. This concept provides a flexible system capable of serving a variety of process heat and cogeneration markets in the near-term.

  19. AREVA HTR concept for near-term deployment

    International Nuclear Information System (INIS)

    Lommers, L.J.; Shahrokhi, F.; Mayer, J.A.; Southworth, F.H.

    2012-01-01

    This paper introduces AREVA's High Temperature Reactor (HTR) steam cycle concept for near-term industrial deployment. Today, nuclear power primarily impacts only electricity generation. The process heat and transportation fuel sectors are completely dependent on fossil fuels. In order to impact this energy sector as rapidly as possible, AREVA has focused its HTR development effort on the steam cycle HTR concept. This reduces near-term development risk and minimizes the delay before a useful contribution to this sector of the energy economy can be realized. It also provides a stepping stone to longer term very high temperature concepts which might serve additional markets. A general description of the current AREVA steam cycle HTR concept is provided. This concept provides a flexible system capable of serving a variety of process heat and cogeneration markets in the near-term.

  20. Development of an integrated fatigue assessment concept for ensuring long term operation

    International Nuclear Information System (INIS)

    Ilg, U.; Ganswind, J.; Motschiedler, W.; Haelbig, J.

    2010-01-01

    Demonstrating fatigue resistance of mechanical components will be one of the major tasks for justification of long term operation and life time extension for nuclear power plants in the near future. As the operational periods of several existing plants are already approaching the specified amount of load cycles laid down in the design basis, discussions have raised concerning the reliability of the as so far established fatigue evaluation procedures. For instance the U.S. Nuclear Regulatory Commission addresses this aspect by considering the conservatism of the design fatigue curves in the ASME Boiler and Pressure Vessel Code for nuclear components. Thus, the impact of environmental degradation on the fatigue behaviour of the pressure retaining parts due to light water ambiance is of special concern. The US-NRC has issued a Regulatory Guide providing the acceptance criteria for domestic license application for new power plants appointing the implementation of additional penalty factors accounting for the environmental impact during the ASME fatigue evaluation. Whereas for existing plants the US-NRC encounters due to ''significant conservatism in quantifying other plant-related variables involved in cumulative fatigue life calculations the design of the current fleet of reactors is satisfactory.'' The German Nuclear Safety Standards Commission (KTA) is going to revise the respective rules on the design and analysis for nuclear components, as well. It is intended to define ''Awareness Thresholds'' for the cumulative usage factor demanding additional considerations beyond CUF > 0.2 for austenitic and beyond CUF > 0.4 for ferritic materials underlying approval processes for new components. However, it is expected that these additional requirements will also be augmented to the evaluation of existing components. For that reason VGB intends to set up a programme for investigations in order to prepare an integrated fatigue assessment concept which is entitled to give a

  1. Short-acting sulfonamides near term and neonatal jaundice

    DEFF Research Database (Denmark)

    Klarskov, Pia; Andersen, Jon Trærup; Jimenez-Solem, Espen

    2013-01-01

    To investigate the association between maternal use of sulfamethizole near term and the risk of neonatal jaundice.......To investigate the association between maternal use of sulfamethizole near term and the risk of neonatal jaundice....

  2. 31 CFR 596.306 - License.

    Science.gov (United States)

    2010-07-01

    ... ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.306 License. Except as otherwise specified, the term license means any license or...

  3. Comparison of Plant Life Management Approaches for Long Term Operations

    International Nuclear Information System (INIS)

    Kang, Kisig

    2012-01-01

    Plant life management can be defined as the integration of ageing and economic planning to maintain a high level of safety and optimize operations. Many Member States have given high priority to long term operation of nuclear power plants beyond the time frame originally anticipated (e. g. 30 or 40 years). Out of a total of 445 (369 GWe) operating nuclear power plants, 349 units (297 GWe) have been in operation for more than 20 years (as of November 2011). The need for engineering support to operation, maintenance, safety review and life management for long term operation as well as education and training in the field is increasingly evident. In addition the Fukushima accident has rendered all stake holders even more attentive to safety concerns and to the provision of beyond safety measures in the preparation and scrutiny of applications for operational design life extensions. In many countries, the safety performance of NPPs is periodically followed and characterized via the periodic safety review (PSR) approach. The regulatory The regulatory review and acceptance of the PSR gives the licensee the permission to operate the plant for up to the end of the next PSR cycle (usually 10 years). In the USA and other countries operating US designed plants, the license renewal application is based on the five pre-requisite requirements and ageing management programme for passive long life system structure and components(SSCs) and active systems is adequately addressed by the maintenance rule (MR) requirements and other established regulatory processes. Other Member States have adopted a combined approach that incorporates elements of both PSR and additional LRA specific requirements primarily focused on time limited ageing analysis. Taking into account this variety of approaches, the international atomic energy agency (IAEA) initiated work for collecting and sharing information among Member States about good practices on plant life management for long term operation in

  4. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  5. Licensing and Operations of the Clive, Utah Low-Level Containerized Radioactive Waste Disposal Facility- A Continuation of Excellence

    International Nuclear Information System (INIS)

    Ledoux, M. R.; Cade, M. S.

    2002-01-01

    Envirocare's Containerized Waste Facility (CWF) is the first commercial low-level radioactive waste disposal facility to be licensed in the 21st century and the first new site to be opened and operated since the late 1970's. The licensing of this facility has been the culmination of over a decade's effort by Envirocare of Utah at their Clive, Utah site. With the authorization to receive and dispose of higher activity containerized Class A low-level radioactive waste (LLRW), this facility has provided critical access to disposal for the nuclear power industry, as well as the related research and medical communities. This paper chronicles the licensing history and operational efforts designed to address the disposal of containerized LLRW in accordance with state and federal regulations

  6. Radiopharmaceutical licensing

    International Nuclear Information System (INIS)

    Mather, S.J.

    1992-01-01

    Recent health service legislation, and especially the loss of crown immunity has once again focussed attention on the arrangements for licensing of radiopharmaceuticals. The aim of the article is to describe in general terms the UK licensing system and in particular to provide guidance to those responsible for the supply of radiopharmaceuticals in hospitals. (author)

  7. Licensing and Operations of the Clive, Utah Low-Level Containerized Radioactive Waste Disposal Facility- A Continuation of Excellence

    Energy Technology Data Exchange (ETDEWEB)

    Ledoux, M. R.; Cade, M. S.

    2002-02-25

    Envirocare's Containerized Waste Facility (CWF) is the first commercial low-level radioactive waste disposal facility to be licensed in the 21st century and the first new site to be opened and operated since the late 1970's. The licensing of this facility has been the culmination of over a decade's effort by Envirocare of Utah at their Clive, Utah site. With the authorization to receive and dispose of higher activity containerized Class A low-level radioactive waste (LLRW), this facility has provided critical access to disposal for the nuclear power industry, as well as the related research and medical communities. This paper chronicles the licensing history and operational efforts designed to address the disposal of containerized LLRW in accordance with state and federal regulations.

  8. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  9. 78 FR 5840 - Notice of License Termination for University of Illinois Advanced TRIGA Reactor, License No. R-115

    Science.gov (United States)

    2013-01-28

    ... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...

  10. Licensed operating reactors. Status summary report data as of December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  11. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  12. 31 CFR 596.309 - Specific license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.309 Specific license. The term specific license means any license or...

  13. 31 CFR 596.305 - General license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.305 General license. The term general license means any license or authorization...

  14. 75 FR 61521 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-10-05

    ... revises the charcoal testing criteria in Technical Specification 5.5.9, ``Ventilation Filter Testing... staffing from two to four, allow in-plant protective actions to be performed by personnel assigned to other functions, and replace a Mechanical Maintenance person with a Non-Licensed Operator. Date of issuance...

  15. 76 FR 39136 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Science.gov (United States)

    2011-07-05

    ... the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR part 2. Interested... Generator (SG) Program,'' to exclude a portion of the tubes below the top of the steam generator tubesheet from periodic steam generator tube inspections during Refueling Outage 14 and the subsequent operating...

  16. 76 FR 73727 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-11-29

    ..., Donald C. Cook Nuclear Plant, Unit 2 (DCCNP-2), Berrien County, Michigan; Date of amendment request... Counsel, Indiana Michigan Power Company, One Cook Place, Bridgman, MI 49106. NRC Acting Branch Chief: Thomas J. Wengert. Notice of Issuance of Amendments to Facility Operating Licenses During the period...

  17. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power license renewal in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. (author)

  18. Comparative assessment of licensing processes of uranium mines in Brazil

    International Nuclear Information System (INIS)

    Silva, K.M.; Menezes, R.M.; Mezrahi, A.

    2002-01-01

    Commercial operation of uranium mining and milling started in Brazil, at the Pocos de Caldas Unit, State of Minas Gerais, in 1982. The Pocos de Caldas Unit was licensed by the Brazilian Regulatory Body (CNEN) and its is now in the decommissioning process. In 2000, a new mining and milling installation, the Caetite Unit, located in State of Bahia, started operation. This paper will discuss how Brazilian Nuclear Energy Commission is licensing the Caetite Unit based on the lessons learned from the Pocos de Caldas Unit. The objective is to draw attention to the importance of the safety assessment for a new unit, specially considering that some wrong decisions were taken for the Pocos de Caldas unit. These decisions lead to less effective long term solutions to protect the environment. Notwithstanding the differences between the two units, it is of great value to use the acquired experience to avoid or minimize the short, medium and long term impacts to the environment and population in the new operation. (author)

  19. Westinghouse AP1000 licensing maturity

    International Nuclear Information System (INIS)

    Schulz, T.; Vijuk, R.P.

    2005-01-01

    The Westinghouse AP1000 Program is aimed at making available a nuclear power plant that is economical in the U.S deregulated electrical power industry in the near-term. The AP1000 is two-loop 1000 MWe pressurizer water reactor (PWR). It is an up rated version of the AP600. The AP1000 uses passive safety systems to provide significant and measurable improvements in plant simplification, safety, reliability, investment protection and plant costs. The AP1000 uses proven technology, which builds on over 35 years of operating PWR experience. The AP1000 received Final Design Approval by the United States Nuclear Regulatory Commission (U.S. NRC) in September 2004. The AP1000 meets the US utility requirements. The AP1000 and its sister plant the AP600 have gone through a very through and complete licensing review. This paper describes the U.S. NRC review efforts of both the AP600 and the AP1000. The detail of the review and the independent calculations, evaluations and testing is discussed. The AP600 licensing documentation was submitted in 1992. The U.S. NRC granted Final Design Approval in 1999. During the intervening 7 years, the U.S. NRC asked thousands of questions, performed independent safety analysis, audited Westinghouse calculations and analysis, and performed independent testing. The more significant areas of discussion will be described. For the AP1000 Westinghouse first engaged the U.S. NRC in pre-certification discussions to define the extent of the review required, since the design is so similar to the AP600. The AP1000 licensing documentation was submitted in March 2002. The U.S. NRC granted Final Design Approval in September 2004. During the intervening 2 1/2 years, the U.S. NRC asked hundreds of questions, performed independent safety analysis, audited Westinghouse calculations and analysis, and performed independent testing. The more significant areas of discussion will be described. The implications of this review and approval on AP1000 applications in

  20. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  1. Licensed operating reactors: Status summary report: Data as of February 29, 1988

    International Nuclear Information System (INIS)

    1988-04-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  2. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal (LR) for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power LR in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. The reactor LRGDs referenced in this poster can all be accessed at http://www.nrc.gov/reactors/operating/licensing/renewal/guidance.html (author)

  3. The long term behaviour of the near-field barrier surrounding a deep underground repository

    International Nuclear Information System (INIS)

    1992-02-01

    This report describes research to identify the factors which govern or influence the long-term behaviour of the near-field of a nuclear waste repository. The near-field components include the engineered barriers and the natural rock mass although the behaviour of the rock mass is of greater significance over the long-term. The factors which govern the near-field behaviour consist of the processes which operate, and the properties or parameters of the rock mass which might be modified by them. The methods which are available for the prediction of the near-field behaviour have been identified, and the emphasis on computer based methods is noted. Summary details of generic computer techniques are provided for different process modelling requirements. An attempt is made to indicate how different processes will be important at various stages during the life of the repository and how the evaluation of performance assessment process modelling requires input from empirical models and the results of other process predictions. (Author)

  4. Licensed operating reactors: Status summary report, Data as of July 31, 1987

    International Nuclear Information System (INIS)

    1987-10-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  5. Licensed operating reactors: Status summary report data as of December 31, 1992

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1993-03-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1992) and cumulative data, usually from the date of commercial operation. ne data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  6. Licensed operating reactors: Status summary report, data as of 07-31-86

    International Nuclear Information System (INIS)

    1986-12-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  7. Licensed operating reactors: status summary report, data as of 6-30-81

    International Nuclear Information System (INIS)

    1981-07-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Management and Program Analysis from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the U.S. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the U.S. energy situation as a whole

  8. Licensed operating reactors: Status summary report, Data as of May 31, 1987

    International Nuclear Information System (INIS)

    1987-10-01

    The OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  9. Licensed operating reactors: Status summary report, Data as of June 30, 1987

    International Nuclear Information System (INIS)

    1987-07-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  10. Licensed operating reactors: Status summary report, data as of 12-31-89

    International Nuclear Information System (INIS)

    1990-02-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  11. Licensed operating reactors: Status summary report, data as of September 30, 1989

    International Nuclear Information System (INIS)

    1989-12-01

    THE OPERATING UNITS STATUS REPORT -- LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  12. Licensed operating reactors: Status summary report, data as of August 31, 1987

    International Nuclear Information System (INIS)

    1987-12-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  13. Licensed operating reactors: Status summary report, Data as of October 31, 1987

    International Nuclear Information System (INIS)

    Schwartz, I.

    1987-12-01

    The operating units status report - licensed operating reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  14. Licensed operating reactors: Status summary report, data as of 9-30-87

    International Nuclear Information System (INIS)

    1987-10-01

    The OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  15. Licensed operating reactors: Status summary report, Data as of 2-28-87

    International Nuclear Information System (INIS)

    1987-10-01

    The Operating Units Status Report- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  16. Impurity control in near-term tokamak reactors

    International Nuclear Information System (INIS)

    Stacey, W.M. Jr.; Smith, D.L.; Brooks, J.N.

    1976-10-01

    Several methods for reducing impurity contamination in near-term tokamak reactors by modifying the first-wall surface with a low-Z or low-sputter material are examined. A review of the sputtering data and an assessment of the technological feasibility of various wall modification schemes are presented. The power performance of a near-term tokamak reactor is simulated for various first-wall surface materials, with and without a divertor, in order to evaluate the likely effect of plasma contamination associated with these surface materials

  17. Cause trending analysis for licensing operational events in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Wang Dewei

    2005-01-01

    The human causal factors for all human error licensing operational events on Daya Bay nuclear power station since 1993 to 2003 are categorized, the trend of these causal factors is analyzed. The emphasis is placed on analyzing the deficiencies on complying with and executing regulations and procedures. The results provide directional reference for nuclear power station to improve human performance. (author)

  18. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  19. Licensed operating reactors: Status summary report, data as of 07-31-88

    International Nuclear Information System (INIS)

    1988-09-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  20. Licensed operating reactors: Status summary report, data as of October 31, 1988

    International Nuclear Information System (INIS)

    1988-12-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the Errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  1. Licensed operating reactors: Status summary report, data as of August 31, 1988

    International Nuclear Information System (INIS)

    1988-10-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  2. Licensed operating reactors: Status summary report, data as of May 31, 1988

    International Nuclear Information System (INIS)

    Schwartz, I.

    1988-07-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resource Management from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operation units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by the NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  3. Licensed operating reactors status summary report, data as of April 30, 1989

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  4. Licensed operating reactors. Status summary report, data as of 3-31-82

    International Nuclear Information System (INIS)

    1982-04-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Management and Program Analysis, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the Errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  5. Life Limiting Issues for Long Term Operation of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Esselman, Thomas; Gaertner, John

    2012-01-01

    This paper reports on a study which identified and characterized life limiting issues for consideration by nuclear plant owners in their decision to extend plant life or seek subsequent license renewal. As nuclear plants operate for longer periods, the risk that a condition in the plant or an event that occurs, at the plant or elsewhere, will cause a plant owner not to extend plant life increases. The Fukushima accident has made this concept concrete. This paper defines 'Life Limiting' concepts for nuclear plants. It identifies the highest risk conditions and events that may limit duration of continued operation in nuclear plants and employs a survey to prioritize these concerns. Methods for evaluating these risks and changing the capability of systems, structures, and components (SSC) to reduce and manage this risk in long term operation are presented. Integrated obsolescence -the existence of an accumulation of events or condition that can threaten long term operation- is discussed. Many of the life limiting conditions or events may be controllable by early identification, recognition, and mitigation of the potential threat. The recognition of conditions may allow measures to be taken to mitigate the condition. Recognition of the potential for events that may be life limiting may allow actions to be taken that will minimize the likelihood or consequences of the event. These actions may include enhanced research on the expected behavior of the SSC, risk assessment and management, and enhanced monitoring and aging management at the plant. (author)

  6. Licensed operating reactors: Status summary report data as of June 30, 1988

    International Nuclear Information System (INIS)

    1988-07-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Licensed operating reactors. Status summary report, data as of April 30, 1982

    International Nuclear Information System (INIS)

    1982-05-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Management and Program Analysis, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  8. Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20

    International Nuclear Information System (INIS)

    1996-06-01

    The US Nuclear Regulatory Commission's monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided

  9. Spatial service delivery system for smart licensing & enforcement management

    Science.gov (United States)

    Wahap, N. A.; Ismail, N. M.; Nor, N. M.; Ahmad, N.; Omar, M. F.; Termizi, A. A. A.; Zainal, D.; Noordin, N. M.; Mansor, S.

    2016-06-01

    Spatial information has introduced a new sense of urgency for a better understanding of the public needs in term of what, when and where they need services and through which devices, platform or physical locations they need them. The objective of this project is to value- add existing license management process for business premises which comes under the responsibility of Local Authority (PBT). Manipulation of geospatial and tracing technology via mobile platform allows enforcement officers to work in real-time, use a standardized system, improve service delivery, and optimize operation management. This paper will augment the scope and capabilities of proposed concept namely, Smart Licensing/Enforcement Management (SLEm). It will review the current licensing and enforcement practice of selected PBT in comparison to the enhanced method. As a result, the new enhanced system is expected to offer a total solution for licensing/enforcement management whilst increasing efficiency and transparency for smart city management and governance.

  10. Evolution of near term PBMR steam and cogeneration applications - HTR2008-58219

    International Nuclear Information System (INIS)

    Kuhr, R. W.; Hannink, R.; Paul, K.; Kriel, W.; Greyvenstein, R.; Young, R.

    2008-01-01

    US and international applications for large onsite cogeneration (steam and power) systems are emerging as a near term market for the PBMR. The South African PBMR demonstration project applies a high temperature (900 deg. C) Brayton cycle for high efficiency power generation. In addition, a number of new applications are being investigated using an intermediate temperature range (700-750 deg. C) with a simplified heat supply system design. This intermediate helium delivery temperature supports conventional steam Rankine cycle designs at higher efficiencies than obtained from water type reactor systems. These designs can be adapted for cogeneration of steam, similar to the design of gas turbine cogeneration plants that supply steam and power at many industrial sites. This temperature range allows use of conventional or readily qualifiable materials and equipment, avoiding some cost premiums associated with more difficult operating conditions. As gas prices and CO 2 values increase, the potential value of a small nuclear reactor with advanced safety characteristics increases dramatically. Because of its smaller scale, the 400-500 MWt PBMR offers the economic advantages of onsite thermal integration (steam, hot water and desalination co-production) and of providing onsite power at cost versus at retail industrial rates avoiding transmission and distribution costs. Advanced safety characteristics of the PBMR support the location of plants adjacent to steam users, district energy systems, desalination plants, and other large commercial and industrial facilities. Additional benefits include price stability, long term security of energy supply and substantial CO 2 reductions. Target markets include existing sites using gas fired boilers and cogeneration units, new projects such as refinery and petrochemical expansions, and coal-to-liquids projects where steam and power represent major burdens on fuel use and CO 2 emissions. Lead times associated with the nuclear licensing

  11. 77 FR 33782 - License Amendment To Construct and Operate New In Situ Leach Uranium Recovery Facility; Uranium...

    Science.gov (United States)

    2012-06-07

    ... and Operate New In Situ Leach Uranium Recovery Facility; Uranium One Americas; Ludeman AGENCY: Nuclear... provided the first time that a document is referenced. The Ludeman facility In Situ Leach Uranium Recovery... request to amend Source Material License SUA-1341 to construct and operate a new in situ leach uranium...

  12. Demonstrating safety during license renewal should not be a large task

    International Nuclear Information System (INIS)

    Berto, D.S.

    1993-01-01

    The principal regulatory goal related to nuclear power plant operation is to ensure the health and safety of the public. The principal goal of extended plant operation via the license renewal process is also to ensure the health and safety of the public. The license renewal documentation issued by the Nuclear Regulatory Commission (NRC) provides guidance on what will be acceptable to the NRC in a license renewal application to demonstrate that this goal will be met. Application of this guidance is currently open to wide interpretation, with many of the current approaches proving to be extremely costly, complex, and uncertain of acceptability. This paper evaluates the requirements necessary to ensure the continued health and safety of the public during any license renewal term. This evaluation is based on the stated goals of the License Renewal Rule and on the published bases for the Rule. An approach to License Renewal is recommended that: (1) meets the stated goals of the NRC; (2) is consistent with current regulatory practices; and (3) will continue to ensure the health and safety of the public. This recommended approach is also much less costly than other current approaches, and can be easily agreed to by all participants. This approach will meet regulatory goals, while removing the cost and uncertainty obstacles currently being confronted by utilities. Providing a viable approach to license renewal will allow the renewal process to be pursued by utilities. Without such an approach, safe and reliable nuclear power plants will be permanently shut down at the arbitrary 40 year license limit

  13. The licensing procedure under Atomic Energy Law

    International Nuclear Information System (INIS)

    Ronellenfitsch, M.

    1983-01-01

    This post-doctoral thesis of 1981 has been updated to include developments in this field up to the year 1983. The author discusses in detail all questions relating to the peaceful uses of nuclear energy in the Federal Republic of Germany, predominantly from the point of view of administrative law. He investigates nuclear energy and its contribution to electricity supplies with a view to other energy sources, renewable energy sources, alternative energy policies, nuclear fuel and the fuel cycle, development of the nuclear industry, nuclear power stations in operation, under construction, or in development. Following a survey of the nuclear controversy, both on the national and the international level, the author reviews the legal system and arising controversies in the Federal Republic of Germany, defining the purpose of this thesis to be the systematic analysis of the available legal instruments, in order to show structural deficiencies in the planning law relating to nuclear power stations, and thus reasons of ambiguities within the licensing procedure. The author studies the following terms and requirements: licensing requirements and licensability, the licensing method and scenario, the legal character of licences, their contents and effects within the stepwise procedure, and due publication. (HSCH) [de

  14. The SLOWPOKE licensing model

    Energy Technology Data Exchange (ETDEWEB)

    Snell, V. G.; Takats, F.; Szivos, K.

    1989-08-15

    The SLOWPOKE Energy System (SES-10) is a 10 MW heating reactor that has been developed in Canada. It will be capable of running without a licensed operator in continuous attendance, and will be sited in urban areas. It has forgiving safety characteristics, including transient time-scales of the order of hours. A process called `up-front` licensing has been evolved in Canada to identify, and resolve, regulatory concerns early in the process. Because of the potential market in Hungary for nuclear district heating, a licensing plan has been developed that incorporates Canadian licensing experience, identifies specific Hungarian requirements, and reduces the risk of licensing delays by seeking agreement of all parties at an early stage in the program.

  15. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  16. 76 FR 61391 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-10-04

    ... ''Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR part 2. Interested person(s) should... to be operable in MODES 1, 2, and 3, as well as in MODE 4 when a steam generator (SG) is relied upon... stored diesel fuel oil inventory will require that a 7 day supply be available for each diesel generator...

  17. To License or Not to License Remanufacturing Business?

    Directory of Open Access Journals (Sweden)

    Zu-Jun Ma

    2018-01-01

    Full Text Available Many original equipment manufacturers (OEMs face the choice of whether to license an independent remanufacturer (IR to remanufacture their used products. In this paper, we develop closed-loop supply chain models with licensed and unlicensed remanufacturing operations to analyze the competition and cooperation between an OEM and an IR. The OEM sells new products and collects used products through trade-ins, while the IR intercepts the OEM’s cores to produce remanufactured products and sell them in the same market. We derive optimal decisions for each of the two types of firms in licensed and unlicensed remanufacturing scenarios and identify conditions under which the OEM and the IR would be most likely to cooperate with each other in implementing remanufacturing. The results show although it is beneficial for an OEM to license an IR to remanufacture its cores, it is not always necessary for an IR to accept OEM’s authorization. Moreover, we contrast the result for licensed remanufacturing scenario in the decentralized system with that in the centrally coordinated system to quantify potential inefficiency resulting from decentralization of decision making.

  18. Performance assessment and licensing issues for United States commercial near-surface low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    Birk, S.M.

    1997-10-01

    The final objective of performance assessment for a near-surface LLW disposal facility is to demonstrate that potential radiological impacts for each of the human exposure pathways will not violate applicable standards. This involves determining potential pathways and specific receptor locations for human exposure to radionuclides; developing appropriate scenarios for each of the institutional phases of a disposal facility; and maintaining quality assurance and control of all data, computer codes, and documentation. The results of a performance assessment should be used to demonstrate that the expected impacts are expected to be less than the applicable standards. The results should not be used to try to predict the actual impact. This is an important distinction that results from the uncertainties inherent in performance assessment calculations. The paper discusses performance objectives; performance assessment phases; scenario selection; mathematical modeling and computer programs; final results of performance assessments submitted for license application; institutional control period; licensing issues; and related research and development activities

  19. Near-Term Electric Vehicle Program. Phase II: Mid-Term Summary Report.

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-08-01

    The Near Term Electric Vehicle (NTEV) Program is a constituent elements of the overall national Electric and Hybrid Vehicle Program that is being implemented by the Department of Energy in accordance with the requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976. Phase II of the NTEV Program is focused on the detailed design and development, of complete electric integrated test vehicles that incorporate current and near-term technology, and meet specified DOE objectives. The activities described in this Mid-Term Summary Report are being carried out by two contractor teams. The prime contractors for these contractor teams are the General Electric Company and the Garrett Corporation. This report is divided into two discrete parts. Part 1 describes the progress of the General Electric team and Part 2 describes the progress of the Garrett team.

  20. Perspective about the US license Renewal for NNPP's; Perspectiva sobre la renovacion de licencia para centrales nucleares en los Estados Unidos

    Energy Technology Data Exchange (ETDEWEB)

    Lehnert, D. F.

    2004-07-01

    This article provides and overview of the US License Renewal Rule, 10 CFR 54, and its implementation in the US leading to the preparation and review of a license renewal application. The key regulatory documents and the industry's methodology and guidance for successfully implementing the Rule are discussed. While the process still undergoes change and optimization, it has become predictable and reliable, such that utilities can establish realistic schedules and budgets to complete the license renewal process. Nearly 60% of the US operating units have either received and extended operating license, have submitted their application for review, or have committed to submit an application in the next few years. The article concludes with a discussion of lessons learned from this wealth of experience and some emerging issues that may affect license renewal process. (Author)

  1. Experience acquired by Furnas for licensing nuclear power plants

    International Nuclear Information System (INIS)

    Silva, A.J.C. da; Xavier, E.E.

    1986-01-01

    The system for licensing of Almirante Alvaro Alberto Nuclear Power Plant-Unit 1 is presented. The process phases for reactor construction and operation are described: preliminary site approval; bases for safety review; partial construction permits; final construction permits; emission of final report of safety analysis; initial operation license and permanent operation license. (M.C.K.) [pt

  2. Licensing, supervision, retrofitting

    International Nuclear Information System (INIS)

    Steinkemper, H.

    1991-01-01

    The following proposals for the amendment to the Atomic Energy Act are made: the term of provisions against damage and the content and scope of the principle of commensurability should be defined by law. Their concretization should be left to the level of the statutory instruments and technical codes. In usage the scope of application of the subsequent obligation should be approximated to the category of element relevant to licensing. Lability to indemnification for subsequent obligations should be abolished. The need for a backfitting licence in the case of 'substantial' alterations requires a closer definition. A legal obligation should be placed on operators of nuclear reactors to carry out periodical safety checks. (orig./HSCH) [de

  3. Preserving the Near-Earth Space Environment with Green Engineering and Operations

    Science.gov (United States)

    Johnson, Nicholas L.

    2009-01-01

    Green engineering and operations are essential to preserving the near-Earth space environment for future generations. The U.S. and the international aerospace community have been proactive in addressing the threat of the increasing orbital debris population and the risks to people and property from reentering debris. NASA has led this activity first by devoting resources to thoroughly understand the technical issues and then by developing effective and acceptable policies and guidelines. NASA also worked closely with the international community to ensure that the US aerospace industry was not placed at an economic disadvantage. In the long term, the removal of large orbital debris will be essential to the sustainability of space operations.

  4. U.S. licensing process and ABWR certification

    International Nuclear Information System (INIS)

    Quirk, J.F.; Williams, W.A.

    1996-01-01

    Part 50 of Title 10 of the Code of Federal Regulation (CFR) establishes a two-step licensing process by which the U.S. Nuclear Regulatory Committee (NRC) authorizes nuclear reactor plant construction through issuance of a construction permit and authorizes operation by issuance of an operating license. At each stage, the NRC Staff conducts technical reviews and there is potential for public hearings. In 1989, the NRC issued a new, simplified licensing process: Part 52. The purpose of the Part 52 licensing process is to provide a regulatory framework that brings about earlier resolution of licensing issues. Because issues are not resolved early in the Part 50 licensing process, approval of an operating license is not assured until after a significant investment has been made in the plant. Part 52 increases the stability and certainty of the licensing process by providing for the early resolution of safety and environmental issues. The Part 52 licensing process features (1) early site permits, (2) design certification, and (3) combined construction permit and operating licenses. As part of the U.S. Advanced Light Water Reactor (ALWR) Program to revitalize the nuclear option through the integration of government/utility/industry efforts, GE undertook the role of applying for certification for its latest product line, the Advanced Boiling Water Reactor (ABWR), under the U.S. ABWR certification program. The ABWR design is an essentially complete plant. Initial application for design certification was in 1987 under Part 50. GE reapplied in late 1991 under the newly promulgated Part 52. Following seven years of intensive interactions with the NRC and ACRS, GE was awarded the first Final Design Approval (FDA) under Part 52. The Commission initiated rulemaking by publishing the proposed ABWR Certification Rule in the Federal Register in early 1995. Certification is anticipated mid-1996. (J.P.N.)

  5. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  6. USNRC licensing process as related to nuclear criticality safety

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1987-01-01

    The U.S. Code of Federal Regulations establishes procedures and criteria for the issuance of licenses to receive title to, own, acquire, deliver, receive, possess, use, and initially transfer special nuclear material; and establishes and provides for the terms and conditions upon which the Nuclear Regulatory Commission (NRC) will issue such licenses. Section 70.22 of the regulations, ''Contents of Applications'', requires that applications for licenses contain proposed procedures to avoid accidental conditions of criticality. These procedures are elements of a nuclear criticality safety program for operations with fissionable materials at fuels and materials facilities (i.e., fuel cycle facilities other than nuclear reactors) in which there exists a potential for criticality accidents. To assist the applicant in providing specific information needed for a nuclear criticality safety program in a license application, the NRC has issued regulatory guides. The NRC requirements for nuclear criticality safety include organizational, administrative, and technical requirements. For purely technical matters on nuclear criticality safety these guides endorse national standards. Others provide guidance on the standard format and content of license applications, guidance on evaluating radiological consequences of criticality accidents, or guidance for dealing with other radiation safety issues. (author)

  7. Obtaining college credit for licensed operator courses at the Wolf Creek Generating Station

    International Nuclear Information System (INIS)

    Russo, C.W.; Coulthard, R.C.

    1985-01-01

    The presentation examined alternatives to formal college courses as a means to obtain college credit toward a baccalaureate degree for station operations personnel. The focus is on the American Council on Education (ACE-PONSI) program which evaluates and makes credit recommendations for courses sponsored by organizations, like utilities, whose primary function is not education. Significant elements of the licensed operator program were prepared for an ACE-PONSI review and determined to be equivalent to college level nuclear engineering technology course work. The ACE-PONSI evaluation provides a good foundation and a significant amount of the training program evaluation required prior to the INPO accreditation effort

  8. On the reform of nuclear licensing procedures for plants and operation

    International Nuclear Information System (INIS)

    Lecheler, H.

    1977-01-01

    The nuclear licensing procedures require basic reforming. In doing so, there must be a differentiation between (concrete) licensing of plants and (abstract) decisions on site provision. The provision of sites is exercised directly by the diets of the Laender. For this purpose they enact planning laws on sites for nuclear power plants of different sizes. As far as the Federal law is touched upon (especially the Federal act on construction), the Federal legislator has to concede competences to the Laender. No. 6 of section 7 II of the Atomic Energy Act would have to be deleted. The plant licensing procedure is to be limited to a mere safety check-up of a concrete plant. Licensing prerequisites of the Atomic Energy Act are to be made more precise by the Federal legislator, namely by deciding unequivocally the purpose of the law, whether priority is given to promotion or to protection, and by making the enacting of tangible regulations a duty. When these licensing prerequisites exist, the law has to concede the applicant a plain title to licensing. (orig.) [de

  9. A Post Licensing Study of Community Effects at Two Operating Nuclear Power Plants. Final Report.

    Science.gov (United States)

    Purdy, Bruce J.; And Others

    In an effort to identify and assess the social, economic, and political effects of nuclear power plant construction and operation upon two host communities (Plymouth, Massachusetts and Waterford, Connecticut), a post-licensing review revealed that the primary impact of the nuclear power plants in both communities was an increase in the property…

  10. NRC as referee (reactor licensing following the Three Mile Island accident)

    International Nuclear Information System (INIS)

    Eisenhut, D.G.

    1984-01-01

    In this article, the NRC's licensing director reports on the progress made by US utilities in complying with the key regulations stemming from the Three Mile Island accident. Over 130 items must be improved at more than 65 reactors. The actions taken by France in response to its own analysis of the accident are discussed. New NRC requirements with regard to operational safety, design, and emergency-response capability are outlined. Nearly all the training, or software, items in Nureg-0737 (''Clarification of TMI Action Plan Requirements'') and more than half of the mechanical, or hardware, items have been completed at plants with operating reactors. The Committee to Review Generic Requirements was created to develop means for controlling the number and nature of NRC requirements placed on licensees. Probabilistic risk-assessment techniques were not widely used by the NRC until after the Three Mile Island accident. The NRC has directed licensees and applicants for operating licenses to conduct control-room design reviews to identify and correct human-engineering discrepancies. Includes 2 tables

  11. Current status of construction license of PEFP

    International Nuclear Information System (INIS)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T.

    2012-01-01

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically

  12. Current status of construction license of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically.

  13. Nuclear regulation. License renewal questions for nuclear plants need to be resolved

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Kruslicky, Mary Ann; McDowell, William D. Jr.; Coleman, Robert L.

    1989-04-01

    A December 1986 pipe rupture at Virginia Power's Surry unit 2 nuclear power plant injured eight workers; four later died. As a result of this accident, Representative Edward J. Markey requested GAO to examine the Surry accident and assess the problems confronting aging nuclear plants. In March 1988 we reported our findings concerning the accident and a July 1987 incident at the Trojan nuclear plant in Oregon. This report addresses problems confronting aging nuclear plants by examining the Nuclear Regulatory Commission's (NRC) program to develop a license renewal policy and accompanying regulations, and the initiatives underway by the Department of Energy (DOE) and the electric utility industry to extend the operating lives of these plants. Nuclear power has become second only to coal as the largest producer of electricity in the United States. The 110 nuclear plants currently in service are operated by 54 utilities, provide about 20 percent of the nation's electricity, and represent a capital investment of over $200 billion. The Atomic Energy Act authorizes NRC to issue nuclear plant operating licenses for up to 40 years and provides for license extensions beyond the initial operating period. The act does not, however, stipulate the criteria for evaluating a utility request to operate a nuclear plant longer than 40 years. The oldest operating license currently in effect will expire in the year 2000. According to NRC, about one-half of the existing operating licenses will terminate by the year 2015, and most licenses will expire by about 2030. Many utilities will have to decide in the early 1990s whether to continue operating older nuclear plants or to construct new generating capacity. A clear understanding of the terms and conditions governing the license renewal process will be a key element in deciding how to meet future electricity demand. Although NRC has developed 3 possible license renewal policy options and identified 15 areas of regulatory uncertainty that

  14. Environmental assessment proposed license renewal of Nuclear Metals, Inc. Concord, Massachusetts

    International Nuclear Information System (INIS)

    Miller, R.L.; Easterly, C.E.; Lombardi, C.E.; Treitler, I.E.; Winbow, R.T.; Zimmerman, G.P.

    1997-02-01

    The US Nuclear Regulatory Commission (NRC) has prepared this Environmental Assessment (EA) to evaluate environmental issues associated with the renewal of licenses issued by NRC for facilities operated by Nuclear Metals, Inc. (NMI) in Concord, Massachusetts. By renewing the licenses, NRC proposes to allow the continuation of ongoing operations involving radioactive materials at NMI's facilities. This EA focuses on the potential impacts related to air emissions at NMI during normal (incident-free) operations and accidental releases. Findings indicate that there are only two areas of potential concern. First, modeling results for sulfur dioxide (SO 2 ) emissions from the boilers during normal operations indicate that the potential exists for exceeding the short-term National Ambient Air Quality Standards (NAAQS). NMI is prepared to undertake mitigative action to prevent potential exceedances of the short-term SO 2 NAAQS, and the Massachusetts Department of Environmental Protection is prepared to resolve the issue via a permit/approval change or through a Consent Order. Second, in the unlikely event of a severe fire, predicted sulfuric acid (H 2 SO 4 ) concentrations based on conservative (upper bound) modeling exceed the Emergency Response Planning Guideline (ERPG) levels. NMI has committed to NRC to give a briefing for local emergency response officials regarding the potential for an accidental H 2 SO 4 release

  15. Integrated Life Cycle Management: A Strategy for Plants to Extend Operating Lifetimes Safely with High Operational Reliability

    International Nuclear Information System (INIS)

    Esselman, Thomas; Bruck, Paul; Mengers, Charles

    2012-01-01

    Nuclear plant operators are studying the possibility of extending their existing generating facilities operating lifetime to 60 years and beyond. Many nuclear plants have been granted licenses to operate their facilities beyond the original 40 year term; however, in order to optimize the long term operating strategies, plant decision-makers need a consistent approach to support their options. This paper proposes a standard methodology to support effective decision-making for the long-term management of selected station assets. Methods detailed are intended to be used by nuclear plant site management, equipment reliability personnel, long term planners, capital asset planners, license renewal staff, and others that intend to look at operation between the current time and the end of operation. This methodology, named Integrated Life Cycle Management (ILCM), will provide a technical basis to assist decision makers regarding the timing of large capital investments required to get to the end of operation safely and with high plant reliability. ILCM seeks to identify end of life cycle failure probabilities for individual plant large capital assets and attendant costs associated with their refurbishment or replacement. It will provide a standard basis for evaluation of replacement and refurbishment options for these components. ILCM will also develop methods to integrate the individual assets over the entire plant thus assisting nuclear plant decision-makers in their facility long term operating strategies. (author)

  16. Safety-evaluation report related to renewal of the operating license for the Texas A and M University Research Reactor. Docket No. 50-128, License R-83

    International Nuclear Information System (INIS)

    1983-03-01

    This Safety Evaluation Report for the application filed by the Texas A and M University (Texas A and M) for a renewal of operating license number R-83 to continue to operate a research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the Texas Engineering and Experiment Station of the Texas A and M University and is located on the campus in College Station, Brazos County, Texas. The staff concludes that the TRIGA reactor facility can continue to be operated by Texas A and M University without endangering the health and safety of the public

  17. Methodology to identify, review, and evaluate components for license renewal

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gregor, F.E.; Walker, R.S.

    1988-01-01

    A methodology has been developed to systematically identify, review, and evaluate plant equipment for license renewal. The method builds upon the existing licensing basis, operating history, and accepted deterministic and probabilistic techniques. Use of these approaches provides a focus for license renewal upon those safety-significant systems and components that are not routinely replaced, refurbished, or subject to detailed inspection as part of the plant's existing test, maintenance, and surveillance programs. Application of the method identified the PWR and BWR systems that should be subjected to detailed license renewal review. Detailed examination of two example systems demonstrates the approach. The review and evaluation of plant equipment for license renewal differ from the initial licensing of the plant. A substantial operating history has been established, the licensing basis has evolved from the original one, and plant equipment has been subject to periodic maintenance and surveillance throughout its life. In consideration of these differences, a basis for license renewal is needed. License renewal should be based upon continuation of the existing licensing basis and recognition of existing programs and operating history

  18. Mobile robotics for CANDU reactor maintenance: case studies and near-term improvements

    International Nuclear Information System (INIS)

    Lipsett, M. G.; Rody, K.H.

    1995-01-01

    Although robotics researchers have been promising that robotics would soon be performing tasks in hazardous environments, the reality has yet to live up to the hype. The presently available crop of robots suitable for deployment in industrial situations are remotely operated, requiring skilled users. This talk describes cases where mobile robots have been used successfully in CANDU stations, discusses the difficulties in using mobile robots for reactor maintenance, and provides near-term goals for achievable improvements in performance and usefulness. (author)

  19. Orbital and Landing Operations at Near-Earth

    Science.gov (United States)

    Scheeres, D. J.

    1995-01-01

    Orbital and landing operations about near-Earth asteroids are different than classical orbital operations about large bodies. The major differences lie with the small mass of the asteroid, the lower orbital velocities, the larger Solar tide and radiation pressure perturbations, the irregular shape of the asteroid and the potential for non-uniform rotation of the asteroid. These differences change the nature of orbits about an asteroid to where it is often common to find trajectories that evolve from stable, near-circular orbits to crashing or escaping orbits in a matter of days. The understanding and control of such orbits is important if a human or robotic presence at asteroids is to be commonplace in the future.

  20. Economic analysis of direct hydrogen PEM fuel cells in three near-term markets

    International Nuclear Information System (INIS)

    Mahadevan, K.; Stone, H.; Judd, K.; Paul, D.

    2007-01-01

    Direct hydrogen polymer electrolyte membrane fuel cells (H-PEMFCs) offer several near-term opportunities including backup power applications in state and local agencies of emergency response; forklifts in high throughput distribution centers; and, airport ground support equipment. This paper presented an analysis of the market requirements for introducing H-PEMFCs successfully, as well as an analysis of the lifecycle costs of H-PEMFCs and competing alternatives in three near-term markets. It also used three scenarios as examples of the potential for market penetration of H-PEMFCs. For each of the three potential opportunities, the paper presented the market requirements, a lifecycle cost analysis, and net present value of the lifecycle costs. A sensitivity analysis of the net present value of the lifecycle costs and of the average annual cost of owning and operating each of the H-PEMFC opportunities was also conducted. It was concluded that H-PEMFC-powered pallet trucks in high-productivity environments represented a promising early opportunity. However, the value of H-PEMFC-powered forklifts compared to existing alternatives was reduced for applications with lower hours of operation and declining labor rates. In addition, H-PEMFC-powered baggage tractors in airports were more expensive than battery-powered baggage tractors on a lifecycle cost basis. 9 tabs., 4 figs

  1. Licensing of New Nuclear Power Plants in Canada

    International Nuclear Information System (INIS)

    Schwarz, Garry; Miller, Doug

    2011-01-01

    The regulatory process for new power plant licensing in Canada, from receipt of the initial application to commercial operation, can be divided into three phases: - Environmental Assessment (EA) and License to Prepare Site; - License to Construct; and - License to Operate. The Nuclear Safety and Control Act (NSCA) does not have provisions for combined licenses for site preparation, construction, or operation. Separate licenses must, therefore, be granted for each phase, and would be issued in sequence. However, applications to prepare a site, to construct and to operate a new nuclear power plant could be assessed in parallel. The total duration from the application for the License to Prepare Site to the issuance of the License to Operate (which is a prerequisite for first fuel load) has been established as 9 years subject to certain factors. To help facilitate this timeline, the CNSC has undertaken an aggressive program of documenting regulatory practices, requirements and guidance to assist applicants in submitting complete applications. Working level procedures to assist CNSC staff in their review of submissions are also under development. Extensive program and project management has been introduced to ensure that timelines will be achieved. In parallel with the above activities, regulatory oversight measures to be employed during site preparation activities and plant construction and commissioning are also being developed. On the international front, the CNSC is participating in the MDEP program to leverage the resources and knowledge of other national regulatory authorities in reviews the CNSC is undertaking. The CNSC also participates in IAEA and other international activities to utilize/adapt international practices as appropriate in Canada. (authors)

  2. Near-term Forecasting of Solar Total and Direct Irradiance for Solar Energy Applications

    Science.gov (United States)

    Long, C. N.; Riihimaki, L. D.; Berg, L. K.

    2012-12-01

    Integration of solar renewable energy into the power grid, like wind energy, is hindered by the variable nature of the solar resource. One challenge of the integration problem for shorter time periods is the phenomenon of "ramping events" where the electrical output of the solar power system increases or decreases significantly and rapidly over periods of minutes or less. Advance warning, of even just a few minutes, allows power system operators to compensate for the ramping. However, the ability for short-term prediction on such local "point" scales is beyond the abilities of typical model-based weather forecasting. Use of surface-based solar radiation measurements has been recognized as a likely solution for providing input for near-term (5 to 30 minute) forecasts of solar energy availability and variability. However, it must be noted that while fixed-orientation photovoltaic panel systems use the total (global) downwelling solar radiation, tracking photovoltaic and solar concentrator systems use only the direct normal component of the solar radiation. Thus even accurate near-term forecasts of total solar radiation will under many circumstances include inherent inaccuracies with respect to tracking systems due to lack of information of the direct component of the solar radiation. We will present examples and statistical analyses of solar radiation partitioning showing the differences in the behavior of the total/direct radiation with respect to the near-term forecast issue. We will present an overview of the possibility of using a network of unique new commercially available total/diffuse radiometers in conjunction with a near-real-time adaptation of the Shortwave Radiative Flux Analysis methodology (Long and Ackerman, 2000; Long et al., 2006). The results are used, in conjunction with persistence and tendency forecast techniques, to provide more accurate near-term forecasts of cloudiness, and both total and direct normal solar irradiance availability and

  3. Resolving the issues arisen during the development of License Renewal Application at PAKS NPP

    International Nuclear Information System (INIS)

    Ratkai, Sandor; Katona, Tamas Janos

    2012-01-01

    Operational license of the four VVER-440/213 units at Paks NPP, Hungary is limited to the design lifetime of 30 years. Extension by an additional 20 years of the original license is one of the main goals of the plant owner. In 2008 a programme for long-term operation (LTO) was developed and submitted to the Hungarian Atomic Energy Authority. The LTO Programme defines the activities for ensuring the extension of the operational lifetime and contains the justification of the safe LTO. The LTO Programme has to be implemented and comprehensive justification of the safe LTO has to be provided in the formal License Renewal Applications unit by unit. This work has been completed by the end of 2011, and the application has been submitted for approval for the Unit 1. The authority review and the approval of the License Renewal Application for Unit 1 should be finished before the expiration of the original design lifetime in 2012. In line with the regulations and supporting the License Renewal Application, a large number of engineering tasks have been performed. In this paper the entire project will be reported. The issues will be discussed, which have been arisen during the development of the application. The difficulties caused by the Hungarian technical and regulatory peculiarities will be presented. (author)

  4. Regulatory analysis for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    This regulatory analysis provides the supporting information for the final rule (10 CFR Part 54) that defines the Nuclear Regulatory Commission's requirements for renewing the operating licenses of commercial nuclear power plants. A set of four specific alternatives for the safety review of license renewal applications is defined and evaluated. These are: Alternative A-current licensing basis; Alternative B-extension of Alternative A to require assessment and managing of aging; Alternative C -- extension of Alternative B to require assessment of design differences against selected new-plant standards using probabilistic risk assessment; and Alternative D -- extension of Alternative B to require compliance with all new-plant standards. A quantitative comparison of the four alternatives in terms of impact-to-value ratio is presented, and Alternative B is the most cost-beneficial safety review alternative

  5. Challenges in the Licensing of New Nuclear Power Plant, Service Life Extension of Operating Ones (Safeguards-Safety-Security Aspects)

    International Nuclear Information System (INIS)

    Horvath, K.

    2016-01-01

    The Hungarian Atomic Energy Authority (HAEA), as the Hungarian nuclear regulator is faced with dual challenges meant by the licensing of the planned construction of two AES-2006 type nuclear power plant units and the licensing of the service life extension of the existing units that have been operating for more than 30 years. The HAEA has full regulatory competence; its mission is to oversee the safety and security of all the peaceful applications of atomic energy. Accordingly, the licensing scope covers safeguards, safety as well as security. The paper shows the current status of the Hungarian nuclear programme and the future plans, as well as summarizes the regulatory approach followed by HAEA. (author)

  6. Regulatory analysis for amendments to regulations for the environmental review for renewal of nuclear power plant operating licenses. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This regulatory analysis provides the supporting information for a proposed rule that will amend the Nuclear Regulatory Commission's environmental review requirements for applications for renewal of nuclear power plant operating licenses. The objective of the proposed rulemaking is to improve regulatory efficiency by providing for the generic evaluation of certain environmental impacts associated with nuclear plant license renewal. After considering various options, the staff identified and analyzed two major alternatives. With Alternative A, the existing regulations would not be amended. This option requires that environmental reviews be performed under the existing regulations. Alternative B is to assess, on a generic basis, the environmental impacts of renewing the operating license of individual nuclear power plants, and define the issues that will need to be further analyzed on a case-by-case basis. In addition, Alternative B removes from NRC's review certain economics-related issues. The findings of this assessment are to be codified in 10 CFR 51. The staff has selected Alternative B as the preferred alternative

  7. Investment issues in nuclear plant license renewal

    International Nuclear Information System (INIS)

    Eynon, R.T.

    1999-01-01

    A method that determines the operating lives for existing nuclear power plants is discussed. These assumptions are the basis for projections of electricity supply through 2020 reported in the Energy Information Administration's (EIA's) Annual Energy Outlook 1999. To determine if plants will seek license renewal, one must first determine if they will be operating to the end of their current licenses. This determination is based on an economic test that assumes an investment of $150/kW will be required after 30 yr of operation for plants with older designs. This expenditure is intended to be equivalent to the cost that would be associated with any of several needs such as a one0time investment to replace aging equipment (steam generators), a series of investments to fix age-related degradation, increases in operating costs, or costs associated with decreased performance. This investment is compared with the cost of building and operating the lowest-cost new plant over the same 10-yr period. If a plant fails this test, it is assumed to be retired after 30 yr of service. All other plants are then considered candidates for license renewal. The method used to determine if it is economic to apply for license renewal and operate plants for an additional 20 yr is to assume that plants face an investment of $250 million after 40 yr of operation to refurbish aging components. This investment is compared with the lowest-cost new plant alternative evaluated over the same 20 yr that the nuclear plant would operate. If the nuclear plant is the lowest cost option, it is projected to continue to operate. EIA projects that it would be economic to extend the operating licenses for 3.7 GW of capacity (6 units)

  8. IRIS Licensing Status

    International Nuclear Information System (INIS)

    Kling, Charles L.; Carelli, Mario D.

    2006-01-01

    The International Reactor Innovative and Secure (IRIS) nuclear power plant is well into the pre-application review process with the US NRC and has accomplished its first near term goal of obtaining US NRC feedback on the long term testing program. To date, the IRIS team has submitted to the US NRC a number of documents patterned after the Evaluation Model Development and Assessment Process (EMDAP) outlined in Regulatory Guide 1,203. They have covered a detailed description of IRIS, initial safety analysis results, PIRT development for limiting transients, scaling analysis and a description of the test program. The IRIS Safety-by-Desing TM intrinsically eliminates and/or significantly reduces the consequences of traditional LWR accidents. In addition, the fewer passive safety systems are similar in principle to those of the US NRC approved AP1000 design. For these reasons, the IRIS testing program only needs to include those features unique to the IRIS design. NRC feedback was that the planned test program appeared to be complete and could generate sufficient information to support a Design Certification (DC) submittal. The US NRC has also stated that a DC application must include complete information regarding the test program. On this basis the IRIS team has initiated an aggressive program to conduct IRIS testing to support a DC submittal by the end of 2008. Subsequent US NRC review should be expeditious because of the AP1000 precedent, allowing IRIS to obtain its Final Design Approval (FDA) in 2012; thereby, maintaining its goal of deployment in the 2015-2017 time frame. The next steps in the pre-application review process will be to provide the US NRC with a road map of the anticipated IRIS licensing process, a review of current licensing requirements showing that IRIS meets or exceeds all current criteria and information to support the long term goal of redefining the Emergency Planning Zone (EPZ)

  9. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    International Nuclear Information System (INIS)

    1995-04-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  10. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  11. Impact on future licensing

    International Nuclear Information System (INIS)

    Pasedag, W.F.; Postma, A.K.

    1986-01-01

    The TMI-2 accident has had a dramatic impact on the assessment of severe accidents, particularly on accident source term assumptions. TMI not only demonstrated that regulatory interest in severe accidents is appropriate, but also illustrated our limited understanding of fission product behaviour under degraded core conditions. The resulting reassessment of accident source terms has resulted in a concerted, world-wide research effort, which has produced a new source term estimation methodology. In order to assess the potential impact of the application of this methodology on regulatory requirements, a comparison with the approach used in licensing analyses is necessary. Such a comparison performed for the TMI-2 accident sequence, shows that differences in assumptions concerning accident progression far outweigh the differences in the methodology per se. In particular, the degree of conservatism incorporated into assumptions concerning operator action and containment response has over-riding influence on source term estimates. A major contribution to the impact of the new source term methodology on regulatory requirements, therefore, is its capability to provide the improved level of understanding necessary for reassessment of regulatory assumptions in this area

  12. Spent fuel receipt and storage at the Morris Operation

    International Nuclear Information System (INIS)

    Astrom, K.A.; Eger, K.J.

    1978-06-01

    Operating and maintenance activities in an independent spent fuel storage facility are described, and current regulations governing such activities are summarized. This report is based on activities at General Electric's licensed storage facility located near Morris, Illinois, and includes photographs of cask and fuel handling equipment used during routine operations

  13. 47 CFR 97.5 - Station license required.

    Science.gov (United States)

    2010-10-01

    .... (3) A military recreation station license grant. A military recreation station license grant may be... States military recreational premises where the station is situated. The person must not be a... the balance of the license term and the suspension is still in effect, suspended for the balance of...

  14. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  15. Status of HTTR and Technology Developments for Near Term Deployment of Nuclear Process Heat Applications in Japan

    International Nuclear Information System (INIS)

    Yan, Xing L.

    2017-01-01

    JAEA's High Temperature Engineering Test Reactor: Main features: Thermal power 30 MWt; Fuel SiC TRISO UO2 coated particle fuel, pin in block; Design type Prismatic core; Coolant Helium; Temperature 950 °C (Max.); Pressure 4 MPa. Proven quality of HTTR coated particle fuel - 50-day 950°C operation test in HTTR (2009): • Proved fuel production quality in commercial-scale facility - Fabricated 2 core loads of fuel for HTTR (2 t of U used); - Failure fraction: 2 orders of magnitude < licensed limits • Demonstrated fuel integrity in HTTR operation and extended burnup test: an order of magnitude < licensed limit

  16. Licensed operating reactors status summary report data as of April 30, 1983. Vol. 7, No. 5

    International Nuclear Information System (INIS)

    1983-05-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  17. Licensed operating reactors: status summary report, data as of May 31, 1983. Volume 7, No. 6

    International Nuclear Information System (INIS)

    1983-06-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  18. Economics of license renewal in the U.S. - entergy's perspective

    International Nuclear Information System (INIS)

    Young, Garry G.

    2003-01-01

    License renewal of operating nuclear plants in the United States has become one of the most successful U.S. nuclear regulatory activities in the past few years. In 1995, the U.S. Nuclear Regulatory Commission (NRC) published a revised rule in 10 CFR Part 54 that provided the requirements for an operating nuclear plant to seek license renewal. At that time, many people believed that only a select few operating nuclear plants would pursue license renewal and that most plants would operate for no more than 40 years. By mid-2003, the owners of approximately 52% of the U.S. nuclear fleet of 103 operating nuclear plants have decided to pursue license renewal and more are expected to follow. This change in direction since 1995 can be attributed to the improving economics of U.S. nuclear power plant operation and to the improved regulatory process resulting from the 1995 revision to 10 CFR Part 54. In 2000, Entergy submitted a license renewal application for Arkansas Nuclear One, Unit 1 (ANO-1). This application was the third to be submitted to the NRC at a time when it was still unclear how successful the regulatory process might be. However, less than 17 months later, in June 2001, the NRC granted a renewed operating license for ANO-1 at a total cost of approximately $11 million. Due in part to the ANO-1 license renewal success, Entergy now has tentative plans to pursue license renewal for the entire fleet of operating nuclear power plants. Without license renewal, Entergy's current nuclear fleet capacity of approximately 9,000 MW(e) would begin to decline in 2012. With license renewal, Entergy's nuclear fleet capacity can remain in place until 2032. This projection does not include the expected improvements in capacity due to power uprate that is currently planned. The combination of power uprate and license renewal will add significant economic value to Entergy's nuclear fleet. One of the major factors in strong performance is capacity factor. In 1990, the average

  19. Environmental assessment proposed license renewal of Nuclear Metals, Inc. Concord, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Miller, R.L.; Easterly, C.E.; Lombardi, C.E.; Treitler, I.E.; Winbow, R.T.; Zimmerman, G.P. [Oak Ridge National Lab., TN (United States)

    1997-02-01

    The US Nuclear Regulatory Commission (NRC) has prepared this Environmental Assessment (EA) to evaluate environmental issues associated with the renewal of licenses issued by NRC for facilities operated by Nuclear Metals, Inc. (NMI) in Concord, Massachusetts. By renewing the licenses, NRC proposes to allow the continuation of ongoing operations involving radioactive materials at NMI`s facilities. This EA focuses on the potential impacts related to air emissions at NMI during normal (incident-free) operations and accidental releases. Findings indicate that there are only two areas of potential concern. First, modeling results for sulfur dioxide (SO{sub 2}) emissions from the boilers during normal operations indicate that the potential exists for exceeding the short-term National Ambient Air Quality Standards (NAAQS). NMI is prepared to undertake mitigative action to prevent potential exceedances of the short-term SO{sub 2} NAAQS, and the Massachusetts Department of Environmental Protection is prepared to resolve the issue via a permit/approval change or through a Consent Order. Second, in the unlikely event of a severe fire, predicted sulfuric acid (H{sub 2}SO{sub 4}) concentrations based on conservative (upper bound) modeling exceed the Emergency Response Planning Guideline (ERPG) levels. NMI has committed to NRC to give a briefing for local emergency response officials regarding the potential for an accidental H{sub 2}SO{sub 4} release.

  20. Long term integrity of spent fuel and construction materials for dry storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Saegusa, T [CRIEPI (Japan)

    2012-07-01

    In Japan, two dry storage facilities at reactor sites have already been operating since 1995 and 2002, respectively. Additionally, a large scale dry storage facility away from reactor sites is under safety examination for license near the coast and desired to start its operation in 2010. Its final storage capacity is 5,000tU. It is therefore necessary to obtain and evaluate the related data on integrity of spent fuels loaded into and construction materials of casks during long term dry storage. The objectives are: - Spent fuel rod: To evaluate hydrogen migration along axial fuel direction on irradiated claddings stored for twenty years in air; To evaluate pellet oxidation behaviour for high burn-up UO{sub 2} fuels; - Construction materials for dry storage facilities: To evaluate long term reliability of welded stainless steel canister under stress corrosion cracking (SCC) environment; To evaluate long term integrity of concrete cask under carbonation and salt attack environment; To evaluate integrity of sealability of metal gasket under long term storage and short term accidental impact force.

  1. Advanced Reactor Licensing: Experience with Digital I&C Technology in Evolutionary Plants

    Energy Technology Data Exchange (ETDEWEB)

    Wood, RT

    2004-09-27

    This report presents the findings from a study of experience with digital instrumentation and controls (I&C) technology in evolutionary nuclear power plants. In particular, this study evaluated regulatory approaches employed by the international nuclear power community for licensing advanced l&C systems and identified lessons learned. The report (1) gives an overview of the modern l&C technologies employed at numerous evolutionary nuclear power plants, (2) identifies performance experience derived from those applications, (3) discusses regulatory processes employed and issues that have arisen, (4) captures lessons learned from performance and regulatory experience, (5) suggests anticipated issues that may arise from international near-term deployment of reactor concepts, and (6) offers conclusions and recommendations for potential activities to support advanced reactor licensing in the United States.

  2. Licensing of ''grandfather's'' facilities: Ukrainian experience

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Bogdan, L.; Steinberg, N.

    1995-01-01

    In the former USSR, unlike most countries, radioactive waste management activities including waste disposal needed no license. But after the USSR breakdown the Ukrainian Parliament -- Verkhovna Rada -- invoked the revised Law on Business activities. According to Article 4 of the Law, in order to treat or to dispose radioactive waste every enterprise has to get a special permission or license. In compliance with the Law, the Cabinet of Ministers by its Ordinance of January 13, 1993, authorized the Ukrainian State Committee for Nuclear and Radiation Safety (UkrSCNRS) to issue special permissions or licenses for waste treatment and disposal. And that requirement was valid not only for future activities but also for existing facilities in operation. Taking into account the undergoing legislative process, SCNRS began to develop its licensing process without waiting for the special nuclear laws to be passed. On the basis of the legislation already in effect, first of all the Law on Enterprises (full responsibility of enterprises for their activities) and Law on Business activities (requirement to have a license for special types of activities), the newly formed national regulatory body had to identify all the enterprises that needed to be licensed, to establish relevant procedures, to develop related regulatory documents, to implement these procedures and documents at operating enterprises, and for each case to make a decision concerning feasibility of issuing a license, period of validity and license conditions

  3. Current status of LTO licensing programme for Bohunice nuclear power plant

    International Nuclear Information System (INIS)

    Borak, J.; Kupca, L.

    2012-01-01

    The objective of long term operation (LTO) licensing programme for Bohunice nuclear power plant is to demonstrate that the relevant structures and components shall perform their functions throughout the entire LTO period during which they shall meet all the relevant safety requirements. All the activities-which should result in utility's request to obtain the licence for LTO-must be performed in line with the relevant legal basis. As of May 2012, the anticipated duration of currently running programme is thirteen months. All relevant documentation, required by the established legal basis, shall be submitted to the licensing authority one year before the Unit 3 design life expiry. (author)

  4. Plant life management for long term operation of nuclear power plants

    International Nuclear Information System (INIS)

    2005-01-01

    The world's fleet of Nuclear Power Plants (NPPs) is approximately 20 years old on average, and most plants are believed to be able to operate for 60 years or more. The design life of a NPP is typically 30 to 40 years. This may be extended by 10 to 20 years, or more, provided that the plant can demonstrate by analysis, trending, equipment and system upgrades, increased vigilance, testing, ageing management, and other means that license renewal presents no threat to public health and safety. The basic goal of Plant Life Management (PLiM) is to satisfy requirements for safe long-term supplies of electricity in an economically competitive way. The basic goal of the operating company and the owners to operate as long as economically reasonable and possible from safety point of view. PLiM is a management tool for doing that. PLiM is a system of programmes and procedures to satisfy safety requirements for safe operation and for power production in a competitive way and for time which is rational from technical and economical point of view. PLiM is not only a technical system, it is also an attitude of the operational company to keep the plant in operation as long as possible from safety and business point of view. The common objectives of PLiM assessment is to help and review the pre-conditions for PLiM and long-term operation approaches. PLiM should not be associated with extension of operational life-time of the NPP only. It is an owner's attitude and rational approach of the operating company to run the business economically and safely. The effectiveness of PLiM Programme can be assessed by three complementary kinds of assessment: self-assessment, peer review and comprehensive programme review by the plant owner/ operator. IAEA will provide the assessment service for peer review of PLiM. Preparation for a PLiM Assessment service will be initiated only after the IAEA has been formally approached by a MS and funding (e.g. an existing Technical cooperation project) has

  5. Project 2019 of Garona Nuclear power plant. First project to licensing renew more than 40 years in Spain

    International Nuclear Information System (INIS)

    Fernandez, R. A.; Torralbo, J. R.

    2004-01-01

    NUCLENOR has been developing lifetime management and modernisation activities at Santa Maria de Garona NPP since the end of the 80's and the plant is now in optimum technical conditions to continue in operation beyond its original lifetime planned in the design (40 years). In the USA, the country of origin of the project, a good number of power plants with a similar design, age and history to SMG are in the process of obtaining or have already obtained, a licensing extension of up to 60 years from the NRC. In Spain, the activities required for requesting a long-term operating licensing extension include the Ageing Assessment and Management of the plant systems, structures and components, in accordance with the american regulation 10CFR54, a Radiological Impact Study for the new operating period, and an Analysis of New Legislation, not included in the licensing bases and considered to be important to safety by the CSN. With a view to obtaining a renewal of the current operating permit for the period 2009-2019, NUCLENOR has launched the Proyecto 2019, which extends to technical and licensing aspects, as it involves all the company's personnel. (Author)

  6. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Science.gov (United States)

    2010-10-01

    ... space stations. (a) Earth station applicants or entities filing a “letter of intent” or “Petition for... Union. (d) Earth station applicants requesting authority to operate with a non-U.S.-licensed space... 47 Telecommunication 2 2010-10-01 2010-10-01 false Application requirements for earth stations...

  7. Licensing reform in the USA

    International Nuclear Information System (INIS)

    1991-01-01

    The licensing process for nuclear power plants in the USA is currently in two distinct stages: the issuance of a construction permit followed later by the issuance of an operation license. The ''two-step'' process has come under heavy criticism from the U.S. nuclear industry on the grounds that it causes uncertainty and delays and therefore inhibits new commitments to nuclear power plants. In 1989 the NRC published new regulations for the licensing of nuclear power plants which provide for the issuance of early site permits, safety certifications of standard designs, and combined construction permits and operating licences. The new rule was challenged by intervenors representing antinuclear groups who filed a legal challenge seeking to have the rule set aside on the grounds that it violates the Atomic Energy Act which they allege makes two-step licensing mandatory. In November 1990 the US Court of Appeals upheld the NRC's authority to issue combined licenses. An appeal for a rehearing has been filed. The paper analyses the events and the possible consequences of an adverse court decision. It reviews the options open to the NRC and industry if the court decision is upheld. The possibility of congressional action to amend the Atomic Energy Act is discussed. (author)

  8. Mark I containment, short term program. Safety evaluation report

    International Nuclear Information System (INIS)

    1977-12-01

    Presented is a Safety Evaluation Report (SER) prepared by the Office of Nuclear Reactor Regulation addressing the Short Term Program (STP) reassessment of the containment systems of operating Boiler Water Reactor (BWR) facilities with the Mark I containment system design. The information presented in this SER establishes the basis for the NRC staff's conclusion that licensed Mark I BWR facilities can continue to operate safely, without undue risk to the health and safety of the public, during an interim period of approximately two years while a methodical, comprehensive Long Term Program (LTP) is conducted. This SER also provides one of the basic foundations for the NRC staff review of the Mark I containment systems for facilities not yet licensed for operation

  9. High-gradient near-quench-limit operation of superconducting Tesla-type cavities in scope of the International Linear Collider

    Directory of Open Access Journals (Sweden)

    Mathieu Omet

    2014-07-01

    Full Text Available We report the successful demonstration of an ILC-like high-gradient near-quench-limit operation at the Superconducting RF Test Facility at the High Energy Accelerator Research Organization (KEK in Japan. Preparation procedures necessary for the accelerator operation were conducted, such as rf phase calibration, beam-based gradient calibration, and automated beam compensation. Test runs were performed successfully for nominal operation, high-loaded Q (Q_{L} operation, and automated P_{k}Q_{L} operation. The results are described in terms of the achieved precision and stabilities of gradients and phases.

  10. Guide to request license for teletherapy practice

    International Nuclear Information System (INIS)

    2000-01-01

    In this work the steps to request license for teletherapy practice are described , among these steps they it continued it plows to request the qualified personnel's yams, the operation authorization, application purpose, license type

  11. A comparison of licensed and un-licensed artisanal and small-scale gold miners (ASGM) in terms of socio-demographics, work profiles, and injury rates.

    Science.gov (United States)

    Calys-Tagoe, Benedict N L; Clarke, Edith; Robins, Thomas; Basu, Niladri

    2017-11-06

    Artisanal and small-scale gold mining (ASGM) represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention) as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months). Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events) and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73%) when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years) versus 5.0 (62 injuries in 1250 person-years) in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years) versus an un-licensed mine (6.1 per 100 person years). These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed site. The findings suggest that certain working

  12. An Examination of Selected Datacom Options for the Near-Term Implementation of Trajectory Based Operations

    Science.gov (United States)

    Johnson, Walter W.; Lachter, Joel B.; Battiste, Vernol; Lim, Veranika; Brandt, Summer L.; Koteskey, Robert W.; Dao, Arik-Quang V.; Ligda, Sarah V.; Wu, Shu-Chieh

    2011-01-01

    A primary feature of the Next Generation Air Transportation System (NextGen) is trajectory based operations (TBO). Under TBO, aircraft flight plans are known to computer systems on the ground that aid in scheduling and separation. The Future Air Navigation System (FANS) was developed to support TBO, but relatively few aircraft in the US are FANSequipped. Thus, any near-term implementation must provide TBO procedures for non-FANS aircraft. Previous research has explored controller clearances, but any implementation must also provide procedures for aircraft requests. The work presented here aims to surface issues surrounding TBO communication procedures for non-FANS aircraft and for aircraft requesting deviations around weather. Three types of communication were explored: Voice, FANS, and ACARS,(Aircraft Communications Addressing and Reporting System). ACARS and FANS are datacom systems that differ in that FANS allows uplinked flight plans to be loaded into the Flight Management System (FMS), while ACARS delivers flight plans as text that must be entered manually via the Control Display Unit (CDU). Sixteen pilots (eight two-person flight decks) and four controllers participated in 32 20-minute scenarios that required the flight decks to navigate through convective weather as they approached their top of descents (TODs). Findings: The rate of non-conformance was higher than anticipated, with aircraft off path more than 20% of the time. Controllers did not differentiate between the ACARS and FANS datacom, and were mixed in their preference for Voice vs. datacom (ACARS and FANS). Pilots uniformly preferred Voice to datacom, particularly ACARS. Much of their dislike appears to result from the slow response times in the datacom conditions. As a result, participants frequently resorted to voice communication. These results imply that, before implementing TBO in environments where pilots make weather deviation requests, further research is needed to develop communication

  13. Electric power from near-term fusion reactors

    International Nuclear Information System (INIS)

    Longhurst, G.R.; Deis, G.A.; Miller, L.G.

    1981-01-01

    This paper examines requirements and possbilities of electric power production on near-term fusion reactors using low temperature cycle technology similar to that used in some geothermal power systems. Requirements include the need for a working fluid with suitable thermodynamics properties and which is free of oxygen and hydrogen to facilitate tritium management. Thermal storage will also be required due to the short system thermal time constants on near-time reactors. It is possbile to use the FED shield in a binary power cycle, and results are presented of thermodynamic analyses of this system

  14. Development and licensing of a melting plant for Chernobyl scrap

    International Nuclear Information System (INIS)

    Sappok, M.; Zunk, H.; Fashevsky, K.A.

    1998-01-01

    One decade after the accident at unit 4 of the Chernobyl nuclear power station, a melting plant for radioactively contaminated metallic materials, the so-called SURF facility, is being planned and licensed for erection in the direct neighbourhood of the NPP area. Main goal is the recycling of the material largely decontaminated by the melting process, by means of manufacturing of casks and containers for waste disposal and of shielding equipment. The melting plant will be part of the Ukrainian waste handling centre (CPPRO). The technology is based on the long-term experience gained at Siempelkamp's CARLA plant in Krefeld. Within 1995 and 1996 the licensing conditions were defined, the licensing documents prepared and the formal procedure initiated. The complex is scheduled to start operation in 2001, in case the necessary financing is allocated. To this end the proposed site of the facility has undergone the state assessment. The technical documentation for construction is at the stage of development. (author)

  15. The need for legislative framework (licensing)

    International Nuclear Information System (INIS)

    Krech, H.

    1977-01-01

    For reasons of public acceptance the basis of a licensing system should be laid down in a law, details can be fixed in regulations below the law-level. The competence for licensing nuclear installations should be attributed to one body, which is not a the same time charged with the promotion of nuclear energy. The licensing authority has to be provided with sufficient technical advice, given by experts organized in advisory bodies. Normally a licensing procedure is split into several steps (site approval, construction permit, operation licence), each step can be subdivided. Some general aspects of licensing conditions (personal, technical and financial) as well as of the licensing procedure are outlined. The participation of the public is of particular importance but also involves most intricate problems. The paper concludes with some critical remarks on the role of administrative courts with respect to the licensing of nuclear power plants. (orig.) [de

  16. Nuclear power plant simulators for operator licensing and training. Part I. The need for plant-reference simulators. Part II. The use of plant-reference simulators

    International Nuclear Information System (INIS)

    Rankin, W.L.; Bolton, P.A.; Shikiar, R.; Saari, L.M.

    1984-05-01

    Part I of this report presents technical justification for the use of plant-reference simulators in the licensing and training of nuclear power plant operators and examines alternatives to the use of plant-reference simulators. The technical rationale is based on research on the use of simulators in other industries, psychological learning and testing principles, expert opinion and user opinion. Part II discusses the central considerations in using plant-reference simulators for licensing examination of nuclear power plant operators and for incorporating simulators into nuclear power plant training programs. Recommendations are presented for the administration of simulator examinations in operator licensing that reflect the goal of maximizing both reliability and validity in the examination process. A series of organizational tasks that promote the acceptance, use, and effectiveness of simulator training as part of the onsite training program is delineated

  17. The long term operation of nuclear power plants in the US

    International Nuclear Information System (INIS)

    Young, G.G.

    2015-01-01

    The NRC has so far granted the renewal license for 73 nuclear reactors in the US but because of economic issues some power plants that got a renewal license are planned to be decommissioned earlier: for instance the Oyster Creek reactor will be stopped definitely in 2019 after a 50 year operating life, another example is the Kewaunee plant that closed mid 2013 while this reactor had been allowed to operate till 2033. The economy concern is the falling price of natural gas that make gas-burning power plants more competitive than nuclear stations. The reactors at risk are the oldest and the smallest ones but in the non-deregulated sector the economic benefit is important for the most powerful reactors to be allowed to operate over 40 and 60 years. A renewal request is composed of a safety assessment of the plant and the assessment of its environmental impact. The safety assessment relies on an Integrated Plant Assessment and on a Time-Limited Ageing Analyses. In order to prepare the second renewal campaign that will allow some reactors to operate up to 80 years, NRC, DOE and EPRI have begun first to identify potential concerns concerning material degradation and secondly to develop an adequate ageing management strategy. (A.C.)

  18. A comparison of licensed and un-licensed artisanal and small-scale gold miners (ASGM in terms of socio-demographics, work profiles, and injury rates

    Directory of Open Access Journals (Sweden)

    Benedict N. L. Calys-Tagoe

    2017-11-01

    Full Text Available Abstract Background Artisanal and small-scale gold mining (ASGM represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. Methods In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Results Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months. Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73% when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years versus 5.0 (62 injuries in 1250 person-years in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years versus an un-licensed mine (6.1 per 100 person years. Conclusions These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed

  19. Safety and licensing of nuclear heating plants

    International Nuclear Information System (INIS)

    Snell, V.G.; Hilborn, J.W.; Lynch, G.F.; McAuley, S.J.

    1989-09-01

    World attention continues to focus on nuclear district heating, a low-cost energy from a non-polluting fuel. It offers long-term security for countries currently dependent on fossil fuels, and can reduce the burden of fossil fuel transportation on railways and roads. Current initiatives encompass large, centralized heating plants and small plants supplying individual institutions. The former are variants of their power reactor cousins but with enhanced safety features. The latter face the safety and licensing challenges of urban siting and remotely monitored operation, through use of intrinsic safety features such as passive decay heat removal, low stored energy and limited reactivity speed and depth in the control systems. Small heating reactor designs are compared, and the features of the SLOWPOKE Energy System, in the forefront of these designs, are summarized. The challenge of public perception must be met by clearly presenting the characteristics of small heating reactors in terms of scale and transparent safety in design and operation, and by explaining the local benefits

  20. Business planning for license renewal and plant acquisitions. Panel Discussion

    International Nuclear Information System (INIS)

    Quinn, Edward L.; Grimes, Chris; Walters, Doug; Doroshuk, Barth; Gasper, Joe; Salmon, Harry; Bier, Vicki M.; Hagen, Ronald; Richardson, Charles J.

    2001-01-01

    Full text of publication follows: Subsequent to Calvert Cliffs and Oconee license renewals in 2000, many plants have not applied for license renewal. Industry is moving to standardize and streamline the process to make it as efficient and effective as possible. At the same time, it is focusing on business practices and competitiveness of nuclear plants in the long-term market-both under regulated and deregulated state formats. In addition, new acquisitions and consolidation in the nuclear market have created several large owner-operators that have specialized business needs. Speakers with experience in the foregoing facets have been selected from the U.S. Nuclear Regulatory Commission, the Nuclear Energy Institute, and utilities to address the business challenges facing them now and in the future. (authors)

  1. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  2. Practical issues in structuring seismic licensing and acquisition agreements

    International Nuclear Information System (INIS)

    Lawrence, M.A.

    1999-01-01

    Some issues facing the geophysical industry in the area of licensing and acquisition agreements are discussed, focusing on a very large business segment of the industry called 'non-exclusive' seismic data (commonly referred to as SPEC data). A historical perspective of the industry in the Gulf of Mexico is presented, highlighting some important aspects of data licenses. The benefits of licensing three-dimensional data to the exploration industry include: (1) economy of scale, (2) 3-D is more affordable, (3) reduced barriers to entry by independents, and (4) improved success rates and reduced risk. A list of 'SPEC' companies in the Gulf of Mexico is provided and the data licensing process is outlined. There are two basic types of seismic data use licenses. The first is for a single, one-time transaction, and the other (which is more prevalent), covers multiple use licenses contemplated over a period of time. This paper briefly outlined the meaning of some important terms usually found in a license agreement, among them ownership, rights of licensee, term, disclosure to third parties, and transfer. International 'SPEC' programs and the requirements for a successful 'SPEC' program are described. The requirements include: a stable host government, reliable, competitive system of concession offerings, long term scheduled offerings, clear, consistent, and acceptable concession terms to oil and gas companies, and consistent, fair and timely method of evaluating bids and awarding concessions. 001CA9901758

  3. Iterative near-term ecological forecasting: Needs, opportunities, and challenges

    Science.gov (United States)

    Dietze, Michael C.; Fox, Andrew; Beck-Johnson, Lindsay; Betancourt, Julio L.; Hooten, Mevin B.; Jarnevich, Catherine S.; Keitt, Timothy H.; Kenney, Melissa A.; Laney, Christine M.; Larsen, Laurel G.; Loescher, Henry W.; Lunch, Claire K.; Pijanowski, Bryan; Randerson, James T.; Read, Emily; Tredennick, Andrew T.; Vargas, Rodrigo; Weathers, Kathleen C.; White, Ethan P.

    2018-01-01

    Two foundational questions about sustainability are “How are ecosystems and the services they provide going to change in the future?” and “How do human decisions affect these trajectories?” Answering these questions requires an ability to forecast ecological processes. Unfortunately, most ecological forecasts focus on centennial-scale climate responses, therefore neither meeting the needs of near-term (daily to decadal) environmental decision-making nor allowing comparison of specific, quantitative predictions to new observational data, one of the strongest tests of scientific theory. Near-term forecasts provide the opportunity to iteratively cycle between performing analyses and updating predictions in light of new evidence. This iterative process of gaining feedback, building experience, and correcting models and methods is critical for improving forecasts. Iterative, near-term forecasting will accelerate ecological research, make it more relevant to society, and inform sustainable decision-making under high uncertainty and adaptive management. Here, we identify the immediate scientific and societal needs, opportunities, and challenges for iterative near-term ecological forecasting. Over the past decade, data volume, variety, and accessibility have greatly increased, but challenges remain in interoperability, latency, and uncertainty quantification. Similarly, ecologists have made considerable advances in applying computational, informatic, and statistical methods, but opportunities exist for improving forecast-specific theory, methods, and cyberinfrastructure. Effective forecasting will also require changes in scientific training, culture, and institutions. The need to start forecasting is now; the time for making ecology more predictive is here, and learning by doing is the fastest route to drive the science forward.

  4. Iterative near-term ecological forecasting: Needs, opportunities, and challenges.

    Science.gov (United States)

    Dietze, Michael C; Fox, Andrew; Beck-Johnson, Lindsay M; Betancourt, Julio L; Hooten, Mevin B; Jarnevich, Catherine S; Keitt, Timothy H; Kenney, Melissa A; Laney, Christine M; Larsen, Laurel G; Loescher, Henry W; Lunch, Claire K; Pijanowski, Bryan C; Randerson, James T; Read, Emily K; Tredennick, Andrew T; Vargas, Rodrigo; Weathers, Kathleen C; White, Ethan P

    2018-02-13

    Two foundational questions about sustainability are "How are ecosystems and the services they provide going to change in the future?" and "How do human decisions affect these trajectories?" Answering these questions requires an ability to forecast ecological processes. Unfortunately, most ecological forecasts focus on centennial-scale climate responses, therefore neither meeting the needs of near-term (daily to decadal) environmental decision-making nor allowing comparison of specific, quantitative predictions to new observational data, one of the strongest tests of scientific theory. Near-term forecasts provide the opportunity to iteratively cycle between performing analyses and updating predictions in light of new evidence. This iterative process of gaining feedback, building experience, and correcting models and methods is critical for improving forecasts. Iterative, near-term forecasting will accelerate ecological research, make it more relevant to society, and inform sustainable decision-making under high uncertainty and adaptive management. Here, we identify the immediate scientific and societal needs, opportunities, and challenges for iterative near-term ecological forecasting. Over the past decade, data volume, variety, and accessibility have greatly increased, but challenges remain in interoperability, latency, and uncertainty quantification. Similarly, ecologists have made considerable advances in applying computational, informatic, and statistical methods, but opportunities exist for improving forecast-specific theory, methods, and cyberinfrastructure. Effective forecasting will also require changes in scientific training, culture, and institutions. The need to start forecasting is now; the time for making ecology more predictive is here, and learning by doing is the fastest route to drive the science forward.

  5. 36 CFR 264.3 - Licensing for commercial use.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Licensing for commercial use... PROPERTY MANAGEMENT Official Forest Service Insignia § 264.3 Licensing for commercial use. (a) Each commercial license granted for the use of the insignia or likeness thereof shall contain the following terms...

  6. SALTO guidelines. Guidelines for peer review of long term operation and ageing management of nuclear power plants

    International Nuclear Information System (INIS)

    2008-01-01

    The average age of nuclear power plants (NPPs) connected to the grid worldwide is increasing. About 20% of all the power reactors operating worldwide have been in operation for more than 30 years, and almost 50% have been in operation for 20 to 30 years, while a rather limited number of new NPPs are being put into operation. In view of this trend, many countries are giving a high priority to continuing the operation of NPPs beyond the time frame originally anticipated (e.g. 30 or 40 years). Long term operation (LTO) for NPPs is operation beyond the established time frame originally set forth by the license term, design limits, standards or regulations. LTO needs to be justified by a safety assessment considering life limiting processes and features for structures, systems and components. Proper and safe LTO is based on the experience and practices of various countries in areas such as plant license renewal, life extension, continued operation and life management. Other activities, including periodic safety review, ageing management and plant modification, are also relevant to LTO. Ageing management of an NPP is an important activity that must be considered before and in conjunction with the decision to enter LTO. Ageing management of NPPs deals with the physical ageing of structures, systems and components (SSCs) that can result in the degradation of their performance characteristics. Thus ageing management helps ensure that SSCs important to safety remain capable of performing their required safety functions. An effective ageing management programme (AMP) is a key element of the safe and reliable operation of NPPs during the originally planned time frame originally planned for their operation, as well as for the period of LTO. In order to assist Member States in managing ageing effectively, the IAEA is developing related safety standards and guidance publications. International peer review is a useful tool for Member States to exchange experience, learn from each

  7. Temperature effect on hydrocarbon deposition on molybdenum mirrors under ITER-relevant long-term plasma operation

    NARCIS (Netherlands)

    Rapp, J.; van Rooij, G. J.; Litnovsky, A.; Marot, L.; De Temmerman, G.; Westerhout, J.; Zoethout, E.

    2009-01-01

    Optical diagnostics in ITER will rely on mirrors near the plasma and the deterioration of the reflectivity is a concern. The effect of temperature on the deposition efficiency of hydrocarbons under long-term operation conditions similar to ITER was investigated in the linear plasma generator

  8. British Columbia Power Export Corporation: Operational review for operating year, October 1989 to September 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The British Columbia Power Export Corporation (POWEREX) is a wholly owned subsidiary of British Columbia Hydro, established in 1988 as the single agency responsible for implementing the provincial policy of international electricity trade. POWEREX objectives are to conduct long term firm electricity trade utilizing private sector financing, operating capabilities, and generating sources. Short term electricity transactions are handled by the part of POWEREX called the Powerex Pool Operation. An operational review of POWEREX for 1989-90 is presented, giving information on export contracts, license approvals, export sales negotiations, pool operation revenues and sales, British Columbia Hydro generation and integrated system performance, and operational planning. 15 figs

  9. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  10. ONR Licensing and Regulation of a Geological Disposal Facility in the UK

    International Nuclear Information System (INIS)

    Boydon, Frans; Glazbrook, David

    2014-01-01

    Document available in abstract form only. Full text follows: The UK has substantial quantities of waste which has arisen from operation and decommissioning of legacy nuclear plant. While a disposal route for Low Level Waste (LLW) has been in operation in the UK for many years, there is as yet no such route for Higher Activity Waste. The government invited local communities to express an interest in hosting a Geological Disposal Facility (GDF). However, the Scottish government is opposed to deep disposal and proposes long-term interim storage in Scotland. This paper describes the work underway and current progress in developing a GDF for the UK. In particular it describes the current legal system in the UK that enables nuclear facilities to be licensed and the background underpinning licensing of existing disposal facilities. It identifies changes which will be necessary to legislation to enable a GDF to be licensed and work which it is performing in close co-operation with the Environment Agency which operate a permitting regime for environmental aspects. The Office of Nuclear Regulation (ONR) regulates safety, security and transport associated with nuclear sites. This paper focuses on the regulation of safety and radioactive waste. The UK licensing regime is non-prescriptive and proportionate, allowing for a flexible approach to licensing. The licence is not time-limited but is designed to be used from construction, through commissioning for the lifetime of the facility. Under the Nuclear Installations Act 1965 (as amended) ONR may attach licence conditions: - In the interests of safety; or - with respect to the handling, treatment and disposal of nuclear matter. ONR has developed a suite of 36 Licence conditions, which typically require the operator to made 'adequate arrangements' to ensure safety. These arrangements would involve the use of 'hold points' beyond which the operator must not proceed without ONR's agreement. In determining

  11. Regulator process for the authorization of an amendment to the operation license of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Perez, R.; Espinosa V, J.M.; Salgado, J.R.; Mamani, Y.R.

    2005-01-01

    The regulator process by which an authorization is granted from an amendment to the License of Operation of a nuclear power station in Mexico is described. It makes an appointment the effective legal mark, the technical characteristics of the modification, the evaluation process and deposition upon oath of tests and finally the elaboration of the Safety report and the Technical Verdict that is a correspondent for the regulator organism to the Secretary of Energy, the one that in turn is the responsible of granting the amendment the License just as it establishes it the Law. (Author)

  12. The Finnish Experience with the Construction of Onkalo. Licensing of a repository for nuclear waste in Finland

    International Nuclear Information System (INIS)

    Avolahti, Jaana

    2014-01-01

    Pursuant to the Nuclear Energy Act (990/1987), a license holder whose operations result, or have resulted, in the generation of nuclear waste must perform all measures included in the management of nuclear waste and preparation thereof and bear all the costs of nuclear waste management. Under law, spent nuclear fuel is regarded as nuclear waste. According to the amendment made to the Nuclear Energy Act in 1994, nuclear waste generated in Finland must be handled, stored and permanently disposed of in Finland. Nuclear waste generated elsewhere may not be handled, stored and permanently disposed of in Finland. The Finnish nuclear legislation defines spent fuel as nuclear waste and requires that it has to be disposed of in the Finnish bedrock. Over 30 years of systematic R and D has been carried out to develop the repository concept, site selection, technologies, safety assessment and the regulatory approach. Activities are based on the Finnish Government's long term strategies since 1983. The stepwise development and future plans for disposal are presented in Table 1. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act (990/1987) and Decree (161/1988). These licensing steps are: - Decision in Principle (DiP); - Construction License; - Operational License. An Environmental Impact Assessment (EIA) shall be conducted prior to the first authorization step of a major nuclear waste facility. The EIA procedure for the final disposal of spent nuclear fuel from three units of the Olkiluoto nuclear power plant and two units of the Loviisa nuclear power plant was carried out in 1998-1999 and extended to one more unit at Olkiluoto in 2008- 2009. Pursuant to the Nuclear Energy Act, before making the DiP the Government shall ascertain whether the municipality planned as the location of the nuclear facility is in favour of the facility, and ensure that no facts indicating a

  13. Licensed operating reactors. Status summary report as of February 29, 1984. Volume 8, No. 3

    International Nuclear Information System (INIS)

    1984-04-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement (IE), from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  14. Evaluation of the contribution of license renewal of nuclear power plants to fault reduction in the U.S

    International Nuclear Information System (INIS)

    Chiba, Goro

    2008-01-01

    Although nuclear power plants in the U.S. were originally permitted to operate for 40 years, operating periods of many plants have been extended by license renewal for another 20 years. On the other hand, plant life management of nuclear power plants in Japan is carried out assuming long-term operation, and the licensee submits aging technology assessment reports before the plant has been operating commercially for 30 years, and then every ten years thereafter, and receives an evaluation by the authorities. In this paper, trend analysis using the INSS database on faults at nuclear power plants overseas, state of implementation of relevant aging management programs, and the effects of license renewal on preservation activities are examined. It is shown that the aging management program identified that many of the cases of fatigue, FAC, and a closed cycle cooling system have been addressed. As a result of analyzing the fault number for each unit, the number of aging faults trends to decrease after applying for license renewal. Therefore, the U.S. license renewal system is considered to be effective for plant life management, and hence the plant life management in Japan, which is substantially equivalent to the U.S. system, is valid. (author)

  15. Economic aspects of long term operation (LTO) of nuclear power plants

    International Nuclear Information System (INIS)

    Lokhov, A.

    2015-01-01

    In 2011, 289 reactors in the world were older than 25 years, and only 45 new units were connected to the grid in 2000-2011. Without life extensions, nuclear capacity would thus fall dramatically in the next decade. In this series of slides the author reviews the legal limits and possibilities for long term operations (LTO) of nuclear reactors in the world. It appears 2 basic regulatory approaches to LTO: the license renewal and the periodic safety review. The typical investment in LTO is in the range of 500-1100 US dollar per kWe. The additional costs of post-Fukushima modifications are about 10 to 20% of initially projected LTO investment. It appears that life extension of more than 10 years is profitable. There are several uncertainties that can influence LTO programmes such as public acceptance, changes in national policies, changes in the prices of other energies and technological issues. The specific investment in LTO is detailed for Belgium, Hungary, the USA and Russia. (A.C.)

  16. License - Gclust Server | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Gclust Server License License to Use This Database Last updated : 2009/09/14 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  17. Nuclear licensing in Slovenia

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.; Vojnovic, D.; Pristavec, M.

    1998-01-01

    The article presents the approach to nuclear licensing in Slovenia. The paper describes, the initialization, internal authorization and review process in the Krsko NPP. The overall process includes preparation, internal independent evaluation, the Krsko Operating Committee and the Krsko Safety Committee review and internal approval. In addition, the continuation of the licensing process is discussed which includes independent evaluation by an authorized institution and a regulatory body approval process. This regulatory body approval process includes official hearing of the licensee, communication with the licensee, and final issuance of a license amendment. The internal evaluation, which follows the methodology of US NRC (defined in 10 CFR 50.59 and NUMARC 125) is described. This concept is partially implemented in domestic legislation.(author)

  18. 10 CFR 81.32 - Terms of exclusive license grant.

    Science.gov (United States)

    2010-01-01

    ... Commission a written notice of the Commission's intention to modify or revoke the license, and the licensee... other books, documents, papers, and records pertaining to such suit. If, as a result of any such...

  19. Long term operation of nuclear power plants – IAEA SALTO peer review service and its results

    Energy Technology Data Exchange (ETDEWEB)

    Krivanek, Robert, E-mail: r.krivanek@iaea.org

    2014-12-15

    Highlights: • SALTO peer review service is designed for reviewing of ageing management and NPPs’ preparedness LTO. • It has been established as an effective tool to review the compliance with IAEA safety standards. • The important issues for safe LTO are being identified by SALTO missions. • Analysis of those issues is provided in the paper. • This peer review service is strongly recommended for NPPs prior to entering LTO period. - Abstract: This paper presents main IAEA activities for safe long term operation (LTO) which includes establishment of IAEA Safety Standards and other LTO related documents, fostering information exchange and establishing databases and provision of SALTO (Safety Aspects of Long Term Operation) peer review service. This paper provides insights into IAEA SALTO peer review service objectives, scope and methodology. The SALTO peer review service was designed to assist nuclear power plant (NPP) operators in adopting a proper approach to LTO of their plants and in implementing complete and appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review service can also support regulators in establishing or improving regulatory and licensing strategies for LTO of NPPs. Issues derived from 19 SALTO missions and 2 LTO modules of OSART (Operational Safety Review Team) missions conducted during the period of 2005 to March 2014 are also analyzed in this paper.

  20. Building social license to operate through community engagement: the WUSC-Rio Tinto Alcan partnership in Ghana

    OpenAIRE

    Eaton, Chris

    2016-01-01

    Presenting the case study of the WUSC-Rio Tinto Alcan partnership in Ghana, this article focuses on the benefits and challenges of a multi-stakeholder partnership between an NGO, a mining company, governments and local communities. Strong community empowerment, alignment of multiple stakeholders’ interests, and the contribution of an expert development NGO definitely contributed to the success of the project, while also strengthening Rio Tinto’s social license to operate.

  1. Implementation of the long term stewardship model of decommissioning power reactors. Update on the Zion project

    Energy Technology Data Exchange (ETDEWEB)

    Christian, J.; Hess, J.; Moloney, B.P. [EnergySolutions EU, Swindon (United Kingdom)

    2012-11-01

    Several countries have announced programmes to phase out nuclear power. Many NPPs built in the 1960s-80s are in any case reaching the end of their planned operating lives. Over the next decade, approximately 60-80 reactors worldwide will reach end of useful life and become candidates for decontamination and dismantling (D and D). Utilities will therefore commission over the coming decade a much larger number of decommissioning programmes to discharge their license responsibilities for reactor dismantling and site remediation. One major strategic question for the utilities is whether they regard decommissioning reactors as part of their core business or whether they wish to transfer this burden and risk in part or in whole to a specialised contractor. This paper reviews progress at the first programme in the US where a non-utility company has taken on the full license responsibility from the utility to undertake site remediation and license termination. We call this model ''Long Term Stewardship'' and it is now fully underway at the Zion NPP near Chicago, Illinois. (orig.)

  2. Advanced Reactor Licensing: Experience with Digital I and C Technology in Evolutionary Plants

    International Nuclear Information System (INIS)

    Wood, RT

    2004-01-01

    This report presents the findings from a study of experience with digital instrumentation and controls (I and C) technology in evolutionary nuclear power plants. In particular, this study evaluated regulatory approaches employed by the international nuclear power community for licensing advanced l and C systems and identified lessons learned. The report (1) gives an overview of the modern l and C technologies employed at numerous evolutionary nuclear power plants, (2) identifies performance experience derived from those applications, (3) discusses regulatory processes employed and issues that have arisen, (4) captures lessons learned from performance and regulatory experience, (5) suggests anticipated issues that may arise from international near-term deployment of reactor concepts, and (6) offers conclusions and recommendations for potential activities to support advanced reactor licensing in the United States

  3. Survey of tritium wastes and effluents in near-term fusion-research facilities

    International Nuclear Information System (INIS)

    Bickford, W.E.; Dingee, D.A.; Willingham, C.E.

    1981-08-01

    The use of tritium control technology in near-term research facilities has been studied for both the magnetic and inertial confinement fusion programs. This study focused on routine generation of tritium wastes and effluents, with little referene to accidents or facility decommissioning. This report serves as an independent review of the effectiveness of planned control technology and radiological hazards associated with operation. The facilities examined for the magnetic fusion program included Fusion Materials Irradiation Testing Facility (FMIT), Tritium Systems Test Assembly (TSTA), and Tokamak Fusion Test Reactor (TFTR) in the magnetic fusion program, while NOVA and Antares facilities were examined for the inertial confinement program

  4. Opportunistic tri-band carrier aggregation in licensed spectrum for multi-operator 5G hetnet

    Science.gov (United States)

    Maksymuk, Taras; Kyryk, Maryan; Klymash, Mykhailo; Jo, Minho; Romaniuk, Ryszard; Kotyra, Andrzej; Zhanpeisova, Aizhan; Kozbekova, Ainur

    2017-08-01

    Increasing capacity of mobile networks is a real challenge due to rapid increasing of traffic demands and spectrum scarcity. Carrier aggregation technology is aimed to increase the user data rate by combining the throughput of few spectrum bands, even if they are not physically collocated. Utilization of unlicensed Wi-Fi 5 GHz band for mobile transmission opens new perspectives for carrier aggregation due to vast amount of spectrum range, which can be available for aggregation to supplement data rates for end users. There are many solutions proposed to enable mobile data transmission in unlicensed band without disturbing interference for the existing Wi-Fi users. The paper presents a new approach for opportunistic carrier aggregation in licensed and unlicensed band for multi-operator 5G network. It allows multiple network operators to utilize unlicensed spectrum opportunistically if it is not currently used by Wi-Fi or other mobile network operators. Performance of the proposed approach has been simulated in case of two competing operators. Simulation results reveal that applying the proposed method ensures achieving satisfactory performance of carrier aggregation for the case of two network operators.

  5. 18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.

    Science.gov (United States)

    2010-04-01

    ... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power... licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is... falsehoods were made by or on behalf of the applicant. (h) Article 8. Any exempted small hydroelectric power...

  6. Evaluation of experience and trends in international co-operation in nuclear safety and licensing

    International Nuclear Information System (INIS)

    Stadie, K.B.; Strohl, P.

    1977-01-01

    The paper traces the development of co-operation in nuclear safety technology between the OECD Member countries which began as early as 1965 and is now organised under the auspices of the Committee on the Safety of Nuclear Installations of the OECD Nuclear Energy Agency. The principal objective is to exchange and evaluate information on relevant R and D and hence broaden the technical basis for decision-making by licensing authorities in the different countries. The membership of the Committee on the Safety of Nuclear Installations combines expertise in nuclear safety R and D and in licensing questions so that licensing procedures in the different countries may be exposed continuously to the influence of overall technological progress. The Committee actively seeks to narrow the differences between administrative procedures and traditional legal practices in Member countries as these affect the licensing of nuclear installations, primarily by assessing and comparing the methods employed. The paper shows how the Committee's working arrangements provide for maximum flexibility: the various co-ordinated programmes are selected after in-depth evaluation of potential areas of priority and are implemented through ad hoc Working Groups, specialist meetings or task forces, or in the form of special studies involving all interested countries. The results, conclusions and recommendations emerging from each programme are reviewed by the Committee before dissemination. Hitherto the greater part of the Committee's activities has been concerned with the safety of light water reactors and related subjects, but more attention is now being given to other topics such as LMFBR safety technology and the safety of fuel cycle facilities, particularly those at the end of the process, the so-called ''back-end'' plants. The paper discusses certain problems and constraints encountered in implementing the programme, some of which stem from Member countries' different degrees of penetration

  7. Economic implications of nuclear plant license renewal in the U.S

    International Nuclear Information System (INIS)

    Smith, L.J.

    2001-01-01

    The NRC and the nuclear industry struggled for many years with the development of a viable license renewal rule. Now that a workable rule appears to have been developed, and the first license renewal applicants have received renewed licenses, the floodgates have opened and a large number of nuclear utilities have announced intentions to seek renewed NRC operating licenses. In this time when profound changes are being experienced in the electric generation markets in the United States, nuclear plant license renewal can have several economic effects that should be considered by utilities prior to the pursuit of an NRC license renewal. This paper examines some of the factors that may be affected by the prospect of an additional 20-year operating life of a nuclear plant. (author)

  8. MEX04/058 supporting the license renewal of the LVNPP

    International Nuclear Information System (INIS)

    Diaz, A.; Arganis, C.; Viais, J.; Mendoza, G.; Lucatero, M. A.; Contreras, A.

    2010-10-01

    Nuclear power plants in the United States are authorized to operate for 40 years. However, this 40-year period was chosen based on economic considerations and not on technological restrictions or safety aspects. In general, the operation of equipment, systems and components in a nuclear power plant is subject to rigorous maintenance and inspection monitoring under strict surveillance programs throughout their life. In fact, according to the Nuclear Energy Institute, in December 2009, 59 nuclear power plants in the United States had already reached the 40 years of the original operating license and carried out their renewal process, extending their operation for up to 20 more years. These 59 nuclear power plants carried out their renewal process, basing their operation mainly on safety reviews that validated the good working order of systems, structures and components, meeting the technical specifications required, as well as complying with the specific safety provisions for prolonging the use of a operating license. The owner is responsible for showing the Regulatory Agency that it is capable of effectively managing the aging of the systems, structures and components,guaranteeing their good working order during the renewal period. In the specific case of Mexico, Unit 1 of the Laguna Verde Nuclear Power Plant (LVNPP) has an original 30-year license, with almost 20 years of proper operation, for which, in order to request a license extension, it is necessary to begin management activities, which allow for constituting and submitting the license renewal application to the Regulatory Agency in order to continue its commercial operation. This paper presents some of most important activities carried out by Instituto Nacional de Investigaciones Nucleares and LVNPP in the international project MEX04/058, related to Plant Life Management as a support of the beginning of plant license renewal process. (Author)

  9. TMI-2 [Three Mile Island Unit 2] licensing history

    International Nuclear Information System (INIS)

    Byrne, J.J.

    1988-01-01

    Three Mile Island (TMI), which is located in central Pennsylvania near Harrisburg, is the site of the TMI-2 accident, the most significant nuclear accident in US commercial nuclear power. Since the accident on March 28, 1979, TMI-2 has been undergoing cleanup activities designed to place the plant in a safe, stable, and secure postaccident configuration. At the completion of the cleanup program, TMI-2 will be placed in such a configuration, termed postdefueling monitored storage (PDMS), by the licensee, GPU Nuclear Corporation. The purpose of this paper is to provide a brief overview of the TMI-2 licensing history and to describe its impact on the regulatory process

  10. License - AcEST | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us AcEST License to Use This Database Last updated : 2010/02/15 You may use this database in co...he Standard License specifies the license terms regarding the use of this database and the requirements you ...must follow in using this database. The Additional License specifies those items ... License The Standard License for this database is the license specified in the Creative Commons Attribution...-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  11. 77 FR 63343 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-10-16

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... for an inoperable diesel generator (DG). A commensurate change is also proposed to extend the maximum... alternating current power source (i.e., a supplemental diesel generator) with the capability to power any E...

  12. 77 FR 73684 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-12-11

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... emergency diesel generator, and the stored lube oil inventory will also continue to require that a 7-day supply be available for each diesel generator. The changes are consistent with NRC-approved Technical...

  13. 13 CFR 107.1900 - Surrender of license.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Surrender of license. 107.1900 Section 107.1900 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS INVESTMENT COMPANIES Ending Operations as a Licensee § 107.1900 Surrender of license. You may not surrender your...

  14. Safety Evaluation Report related to the renewal of the operating license for the research reactor at Pennsylvania State University

    International Nuclear Information System (INIS)

    1986-01-01

    This Safety Evaluation Report for the application filed by the Pennsylvania State University for a renewal of Operating License R-2 to continue to operate the Pennsylvania State University Breazeale Reactor (PSBR) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located on the campus in University Park, Pennsylvania. On the basis of its technical review, the staff concludes that the reactor facility can continue to be operated by the university without endangering the health and safety of the public or the environment

  15. Atomic Safety and Licensing Board Panel annual report

    International Nuclear Information System (INIS)

    1991-09-01

    In Fiscal Year 1990, The Atomic Safety and Licensing Board Panel (Panel) handled 40 proceedings involving the construction, operation, and maintenance of commercial nuclear power reactors or other activities requiring a license from the Nuclear Regulatory Commission. This report summarizes, highlights, and analyzes how the judges and licensing boards of the Panel addressed the wide-ranging issues raised in these proceedings during the year

  16. Licensing safety critical software

    International Nuclear Information System (INIS)

    Archinoff, G.H.; Brown, R.A.

    1990-01-01

    Licensing difficulties with the shutdown system software at the Darlington Nuclear Generating Station contributed to delays in starting up the station. Even though the station has now been given approval by the Atomic Energy Control Board (AECB) to operate, the software issue has not disappeared - Ontario Hydro has been instructed by the AECB to redesign the software. This article attempts to explain why software based shutdown systems were chosen for Darlington, why there was so much difficulty licensing them, and what the implications are for other safety related software based applications

  17. 47 CFR 80.53 - Application for a portable ship station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.53 Application for a portable ship station license. The Commission may grant a license permitting operation of a...

  18. 77 FR 70837 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-27

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... request: The proposed change will delete Function 14, SG [Steam Generator] Water Level--Low, Coincident... capability to shut down the reactor when required on Low--Low Steam Generator water level. The ability to...

  19. 78 FR 16876 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-19

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... proposes to replace the VHS with an onsite diesel generator as the AAC power source providing this... power source (the VHS) with an additional onsite AAC power source (diesel generator). This equipment can...

  20. 77 FR 67679 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-13

    ... diesel generator surveillance requirements. Margin of safety is related to the ability of the fission... evaluated; or (3) involve a significant reduction in a margin of safety. The basis for this proposed... accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2...

  1. 78 FR 14126 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-04

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... of the document. The E-Filing system also distributes an email notice that provides access to the... Completion Time has no impact on the consequences of any design basis accident since the consequences of an...

  2. License - Open TG-GATEs | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Open TG-GATEs License License to Use This Database Last updated : 2012/05/24 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  3. Licensed operating reactors status summary report, data as of December 31, 1985. Volume 10, No. 1

    International Nuclear Information System (INIS)

    1986-01-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the Errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  4. Needs of anticipation for transport operations

    International Nuclear Information System (INIS)

    Galtier, J.

    2005-01-01

    COGEMA LOGISTICS (formerly Transnucleaire) has designed and manufactured several thousands of casks, and owns fleet of more than 4000 casks. Benefiting from more than 40 years of experience in cask shipment COGEMA LOGISTICS has demonstrated an outstanding performance in transportation and has integrated all feed back from past successful operations in current ones. Early anticipation of needs, i.e. at preliminary design step, is of major importance from a technical point of view (capacity, interface, handling means, licensing), and also in terms of political and public acceptance issues from the design step. This paper will highlight for each step required for the implementation of an optimal transport and storage system: Decision to proceed (including political aspects)-Design of casks to be used (including operational interface)-Licensing process-Manufacturing process-Transport plan, Public Acceptance-Loading Operations-Transport-Maintenance operations. (authors)

  5. Data bank usage in reload design and licensing

    International Nuclear Information System (INIS)

    Goudey, J.L.; Hansen, E.C.; Scigliano, S.M.; Williams, R.D.

    1986-01-01

    In 1977 the Nuclear Energy Business Operations of General Electric Company (GE) began a major project to automate sequential execution of the data transfer between the various computer programs used in performing calculations to support design, release, licensing, and core management of fuel used in boiling water reactors (BWRs). A centralized and controlled data bank was designed and implemented to complement the data management system and to achieve the following objectives: (1) enhance the quality and reliability of engineering data used for design and licensing of BWR fuel; (2) provide for traceability and long-term retrievability of engineering data as required by 10CFR50, Appendix B; (3) standardize the location and minimize the redundancy of engineering data; and (4) make engineering data readily available to all individuals and computer programs with a need for it. The structure of this data bank, which has become known as the BWR Engineering Data Bank or BWR/EDB, was purposefully left flexible and expandable with the ability to accommodate numerical, logical, and textual data. The BWR/EDB has been used by GE during fuel release, fuel and core design, reload licensing, and core management activities for 30 to 40 commercial power reactors over the past several years

  6. The strategy of experimental power reactor licensing in Indonesia

    International Nuclear Information System (INIS)

    Moch Djoko Birmano

    2015-01-01

    Currently, BATAN has being planned to develop Experimental Power Reactor (EPR), that is the research nuclear reactor that can generate power (electricity or heat). The EPR is planned will be built in the National Center for Research of Science and Technology (Puspiptek) area at Serpong, South Tangerang, Banten Province, with the choice of reactor types is HTGR with the power size of 10 MWth. As stated in the Act No. 10 year 1997 on Nuclear Power, that every construction and operation of nuclear reactors and other nuclear installations and decommissioning of nuclear reactors required to have a permit. Furthermore, the its implementation arrangements is regulated in Government Regulation (GR) No. 2 year 2014 on Licensing of Nuclear Installations and Nuclear Material Utilization, which contains the requirements and procedures for the licensing process since site, construction, commissioning, operation, and decommissioning, it means licensing is implemented during the activity of construction, operation and decommissioning of NPPs.While, for the more detailed licensing arrangements available in the guidelines of BAPETEN Chairman Regulation (BCR). This study was conducted to understand the legal and institutional aspects, types and stages, and the licensing process of RDE, and identify licensing strategy so that timely as planned. Methodologies used include the literature study, consultation with experts in BAPETEN, discussions in the national seminar including FGD. (author)

  7. License - TMFunction | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TMFunction License License to Use This Database Last updated : 2017/01/23 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...ion-Share Alike 4.0 International is found here . With regard to this database, you are licensed to: freely

  8. Performance assessment and licensing issues for United States commercial near-surface low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    Birk, S. M.

    1997-01-01

    This paper covers the performance assessment and licensing issues, the performance the objectives, the performance assessment phases, the scenario selection, the mathematical modeling and computer programs, the final results of performance assessments submitted for license applications, the institutional control period, and the licensing issues. 38 refs

  9. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  10. Department of Energy licensing strategy

    International Nuclear Information System (INIS)

    Frei, M.W.

    1984-01-01

    The Department of Energy (DOE) is authorized by the Nuclear Waste Policy Act of 1982 (Act) to site, design, construct, and operate mined geologic repositories for high-level radioactive wastes and is required to obtain licenses from the Nuclear Regulatory Commission (NRC) to achieve that mandate. To this end the DOE has developed a licensing approach which defines program strategies and which will facilitate and ease the licensing process. This paper will discuss the regulatory framework within which the repository program is conducted, the DOE licensing strategy, and the interactions between DOE and NRC in implementing the strategy. A licensing strategy is made necessary by the unique technical nature of the repository. Such a facility has never before been licensed; furthermore, the duration of isolation of waste demanded by the proposed EPA standard will require a degree of reliance on probabilistic performance assessment as proof of compliance that is a first of a kind for any industry. The licensing strategy is also made necessary by the complex interrelationships among the many involved governmental agencies and even within DOE itself, and because these relationships will change with time. Program activities which recognize these relationships are essential for implementing the Act. The guiding principle in this strategy is an overriding commitment to safeguarding public health and safety and to protecting the environment

  11. Risk minimization for near-term deployment of the next generation nuclear plant

    International Nuclear Information System (INIS)

    Lommers, L.; Southworth, F.; Riou, B.; Lecomte, M.

    2008-01-01

    The NGNP program is developing the High Temperature Reactor for high efficiency electricity production and high temperature process heat such as direct hydrogen production. AREVA leads one of three vendor teams supporting the NGNP program. AREVA has developed an NGNP concept based on AREVA's ANTARES indirect cycle HTR concept. The ANTARES-based NGNP concept attempts to manage development risk by using a conservative design philosophy which balances performance and risk. Additional risk mitigation for rapid near-term deployment is also considered. Near-term markets may not require the full capability of the indirect cycle very high temperature concept. A steam cycle concept might better serve near-term markets for high temperature steam with reduced technical and schedule risk. (authors)

  12. Effect of an Education Presentation On the Knowledge and Awareness of Urinary Tract Infection among Non-Licensed and Licensed Health Care Workers in Long-Term Care Facilities.

    Science.gov (United States)

    Freeman-Jobson, Jennifer H; Rogers, Jamie L; Ward-Smith, Peggy

    2016-01-01

    This article presents the findings of a pre-test, post-test quality improvement project that describes the change in knowledge from prior to and following an evidence-based education presentation. The presentation addressed the clinical symptoms, diagnostic processes, interventions, and responsibilities of licensed and unlicensed health care workers employed in long-term care facilities related to prevention and detection of non-catheter-related urinary tract infections. Results indicate that the education presentation improved knowledge in specific.

  13. Near-roadway monitoring of vehicle emissions as a function of mode of operation for light-duty vehicles.

    Science.gov (United States)

    Wen, Dongqi; Zhai, Wenjuan; Xiang, Sheng; Hu, Zhice; Wei, Tongchuan; Noll, Kenneth E

    2017-11-01

    Determination of the effect of vehicle emissions on air quality near roadways is important because vehicles are a major source of air pollution. A near-roadway monitoring program was undertaken in Chicago between August 4 and October 30, 2014, to measure ultrafine particles, carbon dioxide, carbon monoxide, traffic volume and speed, and wind direction and speed. The objective of this study was to develop a method to relate short-term changes in traffic mode of operation to air quality near roadways using data averaged over 5-min intervals to provide a better understanding of the processes controlling air pollution concentrations near roadways. Three different types of data analysis are provided to demonstrate the type of results that can be obtained from a near-roadway sampling program based on 5-min measurements: (1) development of vehicle emission factors (EFs) for ultrafine particles as a function of vehicle mode of operation, (2) comparison of measured and modeled CO 2 concentrations, and (3) application of dispersion models to determine concentrations near roadways. EFs for ultrafine particles are developed that are a function of traffic volume and mode of operation (free flow and congestion) for light-duty vehicles (LDVs) under real-world conditions. Two air quality models-CALINE4 (California Line Source Dispersion Model, version 4) and AERMOD (American Meteorological Society/U.S. Environmental Protection Agency Regulatory Model)-are used to predict the ultrafine particulate concentrations near roadways for comparison with measured concentrations. When using CALINE4 to predict air quality levels in the mixing cell, changes in surface roughness and stability class have no effect on the predicted concentrations. However, when using AERMOD to predict air quality in the mixing cell, changes in surface roughness have a significant impact on the predicted concentrations. The paper provides emission factors (EFs) that are a function of traffic volume and mode of

  14. Overview of the role of economics in plant life management license renewal in the U.S

    International Nuclear Information System (INIS)

    Young, G.G.; Nelson, A.P.

    2002-01-01

    Full text: In 1995, the U.S. Nuclear Regulatory Commission (NRC) published a revised rule in 10 CFR Part 54 that provides the requirements for an operating nuclear plant to seek license renewal. U.S. nuclear power plants obtain a 40-year initial operating license, but under 10 CFR Part 54, additional terms of 20-years each may be obtained through license renewal. Prior to 1995, the estimated cost just to prepare a license renewal application was about $40 million. Under the revised rule, the cost to prepare an application was reduced to about $10 million or less. Although the revised rule generated considerable interest, the decision to seek license renewal is fundamentally an economic decision. In 1995, many people believed that only a select few operating nuclear plants would pursue license renewal and that most would operate for no more than 40 years. The primary reason for this belief was that the cost of keeping U.S. nuclear plants running did not appear to be competitive with other forms of electricity generation. By 1998, the economic conditions in the U.S. were changing dramatically. Electricity deregulation was moving ahead, the need for electricity was growing, and the operating costs for nuclear power plants were declining. Also, in 1998, the first two applications for license renewal were submitted to the NRC by Baltimore Gas and Electric for the two-unit Calvert Cliffs nuclear power plant and by Duke Energy for the three-unit Oconee nuclear power plant. The U.S. nuclear industry was somewhat skeptical that the NRC could complete the license renewal process in a timely and predictable manner. This skepticism was due to the protracted and unpredictable process used by the NRC to approve the original operating licenses, especially in the 1980's and early 1990's. In March 2000, the NRC approved the renewal of the 40-year operating licenses for the two-unit Calvert Cliffs nuclear power plant for an additional 20 years. Two months later, the NRC approved the

  15. Containment long-term operational integrity--a 1988 status report

    International Nuclear Information System (INIS)

    Sammataro, R.F.

    1988-01-01

    Design and in-service codes and standards provide a comprehensive set of requirements for containment design, construction, inspection, testing and repair. Metal and concrete containments must be designed, fabricated, constructed, inspected, tested and maintained to quality standards commensurate with the importance of the safety function to be performed. Periodic integrated leak rate tests are required to assure that containments continue to meet allowable leakage limits. Although overall performance has been quite good to date, several major containment aging and degradation mechanisms have been identified. Two pilot plant life extension studies, one for a boiling water reactor and one for a pressurized water reactor, serve as models for extending the operational integrity of present containments in the United States. Research and testing programs for determining the ultimate pressure capacity and failure mechanisms for containments under severe loading conditions and studied for extending the life of current plants beyond the present 40 year licensed lifetime are underway. This paper presents an overview of containment designs in the USA and a discussion of the regulatory and ASME Code requirements for the design, construction, in-service inspection, testing and repair for containments. Findings for containments from the pilot plant life extension studies and the ongoing containment research and testing programs are also discussed. The regulatory and ASME Code requirements for design, construction, in-service inspection and periodic integrated leakage testing together with recommendations from the plant life extension studies and containment integrity research and testing provide a basis for continued containment long-term operational integrity

  16. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  17. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant...

  18. The regulatory review of construction license application and the supporting safety case

    International Nuclear Information System (INIS)

    Heinonen, Jussi

    2014-01-01

    Finland is one of the foremost countries in the world in developing the disposal of spent fuel. The construction license application for the Olkiluoto spent fuel disposal facility was submitted to the authorities at the end of 2012 and the facility is expected to start operation around 2020. This has been a long-term project with over 30 years of parallel development of the repository project and the regulatory approach to spent fuel management. In 1983 the government made a strategic decision on the objectives and target time schedule for the research, development and technical planning of nuclear waste management. While an export and international disposal solution was still the preferred option, this decision required the licensees without this possibility to prepare for disposal in Finland and it also gave the time line for the milestones on the way to an operating disposal facility by 2020. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act and Decree (1987, 1988). These licensing steps are: - Decision-in-principle is required for a nuclear facility having considerable general significance. This is essentially a political decision: the government decides if the construction project is in line with the overall good of society. The decision can be applied for one or more sites, the host municipality has a veto right and the parliament has the choice of ratifying or not ratifying the decision. - Construction license is granted by the government and authorises the construction of the disposal facility. The actual construction is regulated by STUK and includes several review and approval steps, hold points and viewpoints. - Operational license is granted by the government and authorises the operation of the facility for a certain period. The operational license is needed before nuclear waste can be disposed. The first step in the licensing process was reached

  19. SAFSTOR and License Renewal: Making Them Coexist

    International Nuclear Information System (INIS)

    Henries, William PE

    2008-01-01

    The Indian Point Energy Center is located on the eastern shore of the Hudson River in the town of Buchanan, New York. It lies approximately thirty miles north of New York City, and thus, holds the distinction of being the closest nuclear facility to a major metropolitan area. Units 1 and 2 were constructed and operated by Consolidated Edison and Unit 3 was owned and operated by the New York State Power Authority. All three units are now owned and operated by Entergy Nuclear- Northeast. Indian Point Unit 1 was powered by a pressurized water reactor which operated with an authorized maximum steady state power level of 615 thermal megawatts until October 31, 1974. On June 19, 1980, the Commission issued an order revoking authority to operate the facility. Although 244 spent fuel assemblies were successfully shipped offsite to a spent fuel reprocessing facility, 160 assemblies remain in the Unit 1 spent fuel pool awaiting relocation to dry cask storage. Units 2 and 3 are also pressurized water reactors which each produce slightly in excess of 1,000 MWe. Since 1974, Unit 1 has been maintained in a Safe Store Mode (SAFSTOR). For the purposes of this document, the term 'SAFSTOR' is intended to mean 'Custodial SAFSTOR' as described in section 2.4.3 of NUREG 0586 (Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities (GEIS) as follows: 'Custodial SAFSTOR requires a minimum cleanup and decontamination effort initially, followed by a period of continuing care with the active protection systems (principally the ventilation system) kept in service throughout the storage period. Full-time onsite surveillance by operating and security forces is required to carry out radiation monitoring, to maintain the equipment, and to prevent accidental or deliberate intrusion into the facility and the subsequent exposure to radiation or the disposal of radioactivity beyond the confines of the facility'. The decision to enter SAFSTOR was based upon the immediate

  20. License - Dicty_cDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Dicty_cDB License to Use This Database Last updated : 2010/02/15 You may use this database i...w. The Standard License specifies the license terms regarding the use of this database and the requirements ...you must follow in using this database. The Additional License specifies those it...dard License The Standard License for this database is the license specified in the Creative Commons Attribu...tion-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  1. 77 FR 24712 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-25

    ... Global Logistics LLC (OFF), 9816 Whithorn Drive, Suite B, Houston, TX 77095, Officer: Herbert R. Hogg, Operating Manager (Qualifying Individual), Application Type: New OFF License. Toyo Logistics America, Inc... Individual), Application Type: New NVO License. Choiceone Logistics, Inc. (NVO & OFF), 10025 NW 116th Way, 17...

  2. 75 FR 69080 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-10

    ... license as a Non-Vessel-Operating Common Carrier (NVO), and/or Ocean Freight Forwarder (OFF)--Ocean..., Building 14-A, Kenner, LA 70062, Officers: Gary J. Cheramie, President (Qualifying Individual), George...: License Transfer. Total Global Solutions, Inc. (NVO & OFF), 4290 Bells Ferry Road 224, Suite 106, Kennesaw...

  3. Nuclear power plant licensing in Canada

    International Nuclear Information System (INIS)

    Tong, J.S.C.; Waddington, J.G.

    1997-01-01

    The Canadian nuclear power plant licensing practice which has evolved over three decades provides a regulatory framework that promotes safe design and operation of CANDU power plants. From the very outset, it recognizes the need for simple and reliable safety systems which are separate from the systems that are normally used to produce electricity. Further, it requires the reliability of safety systems be demonstrated by routine tests during plant operation. Over the three decades, the analysis requirements to demonstrate the performance and reliability of plant systems that have a role in the detection and mitigating of accidents have also evolved. Today's requirements are defined in consultative documents C-6 and C-98. One recurring theme throughout the evolution of the licensing practice is the maxim of prescribing only basic safety requirements and rules so that designers and operators have the freedom to devise the best possible design features and operating practices

  4. Attention Problems, Phonological Short-Term Memory, and Visuospatial Short-Term Memory: Differential Effects on Near- and Long-Term Scholastic Achievement

    Science.gov (United States)

    Sarver, Dustin E.; Rapport, Mark D.; Kofler, Michael J.; Scanlan, Sean W.; Raiker, Joseph S.; Altro, Thomas A.; Bolden, Jennifer

    2012-01-01

    The current study examined individual differences in children's phonological and visuospatial short-term memory as potential mediators of the relationship among attention problems and near- and long-term scholastic achievement. Nested structural equation models revealed that teacher-reported attention problems were associated negatively with…

  5. License - Yeast Interacting Proteins Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Yeast Interacting Proteins Database License to Use This Database Last updated : 2010/02/15 You may use this database...nal License described below. The Standard License specifies the license terms regarding the use of this database... and the requirements you must follow in using this database. The Additional ...the Standard License. Standard License The Standard License for this database is the license specified in th...e Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database

  6. Roundtable discussion: Materials management issues supporting licensing renewal

    International Nuclear Information System (INIS)

    1991-01-01

    The purpose of this technical session is to discussion the relationships between nuclear materials management/procurement engineering and plant license renewal. The basis for the discussion is DG-1009 'Standard format and content of technical information for applications to renew nuclear power plant operating licenses', dated 12/90

  7. M2 priority screening system for near-term activities: Project documentation. Final report December 11, 1992--May 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-08-12

    From May through August, 1993, the M-2 Group within M Division at LANL conducted with the support of the LANL Integration and Coordination Office (ICO) and Applied Decision Analysis, Inc. (ADA), whose purpose was to develop a system for setting priorities among activities. This phase of the project concentrated on prioritizing near-tenn activities (i.e., activities that must be conducted in the next six months) necessary for setting up this new group. Potential future project phases will concentrate on developing a tool for setting priorities and developing annual budgets for the group`s operations. The priority screening system designed to address the near-term problem was developed, applied in a series of meeting with the group managers, and used as an aid in the assignment of tasks to group members. The model was intended and used as a practical tool for documenting and explaining decisions about near-term priorities, and not as a substitute for M-2 management judgment and decision-making processes.

  8. Four Essays on Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    &D strategies. On the supply side, the existing literature has been focused on understanding how technology licensing can be used by firms as a mechanism to recover investments in innovative activities and to foster learning opportunities. On the demand side, it has been shown that licensing is an important...... source that firms can tap into to feed their internal needs for innovative knowledge. While several studies have examined technology licensing through the lens of the licensor, research on how firms rely on licensing contracts to acquire knowledge and improve their innovation performance still leaves......Licensing contracts represent one of the most widely used mechanisms to exchange technologies and transfer know-how between firms. Due to the opportunities that licensing creates for firms operating on both sides of the markets for technology, it has increasingly become an integral part of firms’ R...

  9. Near-Term Nuclear Power Revival? A U.S. and International Perspective

    International Nuclear Information System (INIS)

    Braun, C.

    2004-01-01

    In this paper I review the causes for the renewed interest in the near-term revival of nuclear power in the U.S. and internationally. I comment on the progress already made in the U.S. in restarting a second era of commercial nuclear power plant construction, and on what is required going forwards, from a utilities perspective, to commit to and implement new plant orders. I review the specific nuclear projects discussed and committed to in the U.S. and abroad in terms of utilities, sites, vendor and suppliers teams, and project arrangements. I will then offer some tentative conclusions regarding the prospects for a near-term U.S. and global nuclear power revival

  10. 30 CFR 57.12071 - Movement or operation of equipment near high-voltage powerlines.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement or operation of equipment near high-voltage powerlines. 57.12071 Section 57.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION...-voltage powerlines. When equipment must be moved or operated near energized high-voltage powerlines (other...

  11. Lifetime Management Programs as a basis for the long term operation of nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    López González, Manuel; Lobato Galeote, Carlos, E-mail: mlopezg@idom.com, E-mail: carlos.lobato@idom.com [IDOM - Consulting, Engineering & Architecture SAU, Madrid (Spain)

    2017-07-01

    From the licensing standpoint there are several approaches worldwide to obtain an authorization to operate a NPP beyond its design life. According to the License Renewal Application (LRA) approach, followed in the United States of America and another countries, plants need to develop a Life Time Management Program (LTMP) with which manage the potential aging processes (corrosion, erosion, erosion-corrosion, radiation and thermally induced embrittlement, fatigue, corrosion fatigue, creep, binding and wear) associated to the Structures, Systems and Components. A LTMP is composed of several tasks which represents a technical challenge for a nuclear installation. (author)

  12. Lifetime Management Programs as a basis for the long term operation of nuclear installations

    International Nuclear Information System (INIS)

    López González, Manuel; Lobato Galeote, Carlos

    2017-01-01

    From the licensing standpoint there are several approaches worldwide to obtain an authorization to operate a NPP beyond its design life. According to the License Renewal Application (LRA) approach, followed in the United States of America and another countries, plants need to develop a Life Time Management Program (LTMP) with which manage the potential aging processes (corrosion, erosion, erosion-corrosion, radiation and thermally induced embrittlement, fatigue, corrosion fatigue, creep, binding and wear) associated to the Structures, Systems and Components. A LTMP is composed of several tasks which represents a technical challenge for a nuclear installation. (author)

  13. License - CREATE portal | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us CREATE portal License License to Use This Database Last updated : 2016/03/16 You may use this database... the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribu...tion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...hare Alike 4.0 International is found here . With regard to this database, you are licensed to: freely acces

  14. 7 CFR 4290.2000 - Operational Assistance Grants to RBICs.

    Science.gov (United States)

    2010-01-01

    ... Regulatory Capital raised by the RBIC at the time of licensing or $1,000,000. (d) Term. Operational... Smaller Enterprises to which it either has made, or expects to make, a Financing. (c) Amount of grant...

  15. Safety-evaluation report related to the renewal of the operating license for the Cornell University TRIGA Research Reactor. Docket No. 50-157

    International Nuclear Information System (INIS)

    1983-08-01

    This Safety Evaluation Report for the application filed by the Cornell University for a renewal of Operating License R-80 to continue to operate a research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by Cornell University and is located on the Cornell campus in Ithaca, New York. The staff concludes that the TRIGA reactor facility can continue to be operated by Cornell without endangering the health and safety of the public

  16. Near-Term Opportunities for Carbon Dioxide Capture and Storage 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This document contains the summary report of the workshop on global assessments for near-term opportunities for carbon dioxide capture and storage (CCS), which took place on 21-22 June 2007 in Oslo, Norway. It provided an opportunity for direct dialogue between concerned stakeholders in the global effort to accelerate the development and commercialisation of CCS technology. This is part of a series of three workshops on near-term opportunities for this important mitigation option that will feed into the G8 Plan of Action on Climate Change, Clean Energy and Sustainable Development. The ultimate goal of this effort is to present a report and policy recommendations to the G8 leaders at their 2008 summit meeting in Japan.

  17. California Power-to-Gas and Power-to-Hydrogen Near-Term Business Case Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Eichman, Josh [National Renewable Energy Lab. (NREL), Golden, CO (United States); Flores-Espino, Francisco [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-12-01

    Flexible operation of electrolysis systems represents an opportunity to reduce the cost of hydrogen for a variety of end-uses while also supporting grid operations and thereby enabling greater renewable penetration. California is an ideal location to realize that value on account of growing renewable capacity and markets for hydrogen as a fuel cell electric vehicle (FCEV) fuel, refineries, and other end-uses. Shifting the production of hydrogen to avoid high cost electricity and participation in utility and system operator markets along with installing renewable generation to avoid utility charges and increase revenue from the Low Carbon Fuel Standard (LCFS) program can result in around $2.5/kg (21%) reduction in the production and delivery cost of hydrogen from electrolysis. This reduction can be achieved without impacting the consumers of hydrogen. Additionally, future strategies for reducing hydrogen cost were explored and include lower cost of capital, participation in the Renewable Fuel Standard program, capital cost reduction, and increased LCFS value. Each must be achieved independently and could each contribute to further reductions. Using the assumptions in this study found a 29% reduction in cost if all future strategies are realized. Flexible hydrogen production can simultaneously improve the performance and decarbonize multiple energy sectors. The lessons learned from this study should be used to understand near-term cost drivers and to support longer-term research activities to further improve cost effectiveness of grid integrated electrolysis systems.

  18. Quantification of source-term profiles from near-field geochemical models

    International Nuclear Information System (INIS)

    McKinley, I.G.

    1985-01-01

    A geochemical model of the near-field is described which quantitatively treats the processes of engineered barrier degradation, buffering of aqueous chemistry by solid phases, nuclide solubilization and transport through the near-field and release to the far-field. The radionuclide source-terms derived from this model are compared with those from a simpler model used for repository safety analysis. 10 refs., 2 figs., 2 tabs

  19. Fuel licensing process for an industrial use. ATF licensing process for an industrial use - Utility's perspective

    International Nuclear Information System (INIS)

    Waeckel, Nicolas

    2013-01-01

    To develop and license a breakthrough nuclear fuel technology for commercial use is becoming challenging. All the former safety analysis design limits (SAFDLs) defined in the 1970's for the standard UO 2 -Zr fuels, might no longer be applicable. Identification of the appropriate safety analysis design limits For each type of innovative fuel, the developers will have to identify and investigate all the possible failure/ruins scenarios (not only those related to severe accidents but also those related to normal operation). In order to save time and to focus on the best options, those failure scenarios (which could be 'killers' for the ATF concept) have to be determined early enough in the development process. Based on the above failure scenarios, the developers will have to propose the licensing limits (and the experimental protocol to determine and to justify them). As mentioned earlier, the licensing limits should not be defined against the accidental conditions only. For the operators, the (good) in-reactor fuel behaviour is crucial. As an example, in the case of the new fuel concepts coming with an outer coating, it is important to include the analysis of the consequences of the loss of this protective outer layer in the licensing process due to a manufacturing defect or an inevitable in-reactor fretting wear. Obviously, the new/specific SAFDLs will have to be endorsed by the regulators (which could be a long process by itself). Identification of a commercial reactor to irradiate the first ATF A commercial NPP is not a material test reactor (MTR); irradiating lead test fuel rods (LTFRs) or lead test assemblies (LTAs) implies strict requirements regarding the manufacturing processes [which should not include chemicals (additives or solvents) potentially incompatible with the nuclear technical specifications], the compatibility with the hosting fuel core (in terms of geometry, enrichment, thermal hydraulic performances, etc.) and the robustness and

  20. U.S. regulatory requirements for nuclear plant license renewal: The B and W Owners Group License Renewal Program

    International Nuclear Information System (INIS)

    Staudinger, Deborah K.

    2004-01-01

    This paper discusses the current U.S. Regulatory Requirements for License Renewal and describes the Babcock and Wilcox Owners Group (B and WOG) Generic License Renewal Program (GLRP). The B and W owners, recognizing the need to obtain the maximum life for their nuclear generating units, embarked on a program to renew the licenses of the seven reactors in accordance with the requirements of the Atomic Energy Act of 1954 and further defined by Title 10 of the Code of Federal Regulation Part 54 (10 CFR 54). These reactors, owned by five separate utilities, are Pressurized Water Reactors (PWR) ranging in net rated capacity from approximately 800 to 900 MW. The plants, predominately constructed in the 70s, have USNRC Operating Licenses that expire between 2013 to 2017. (author)

  1. Safety Evaluation Report related to the renewal of the operating license for the Westinghouse research reactor at Zion, Illinois (Docket No. 50-87)

    International Nuclear Information System (INIS)

    1984-09-01

    This Safety Evaluation Report, for the application filed by the Westinghouse Electric Company, for renewal of operating license number R-119 to continue to operate the research reactor, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is operated by Westinghouse and is located in Zion, Illinois. The staff concludes that the reactor facility can continue to be operated by Westinghouse without endangering the health and safety of the public

  2. Safety Evaluation Report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323)

    International Nuclear Information System (INIS)

    1991-06-01

    Supplement 34 to the Safety Evaluation Report for the application by Pacific Gas and Electric Company (PG ampersand E) for licenses to operate Diablo Canyon Nuclear Power Plant, Unit Nos. 1 and 2 (Docket Nos. 50-275 and 50-323, respectively) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement documents the NRC staff review of the Long-Term Seismic Program conducted by PG ampersand E in response to License Condition 2.C.(7) of Facility Operating License DPR-80, the Diablo Canyon Unit 1 operating license. 111 refs., 20 figs., 31 tabs

  3. License - Metabolonote | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Metabolonote License License to Use This Database Last updated : 2016/06/22 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...e Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database

  4. Impact of New Radiation Safety Standards on Licensing Requirements of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Strohal, P.; Subasic, D.; Valcic, I.

    1996-01-01

    As the outcomes of the newly introduced safety philosophies, new and more strict safety design requirements for nuclear installation are expected to be introduced. New in-depth defence measures should be incorporated into the design and operation procedure for a nuclear installation, to compensate for potential failures in protection or safety measures. The new requirements will also apply to licensing of NPP's operation as well as to licensing of nuclear sites, especially for radioactive waste disposal sites. This paper intends to give an overview of possible impacts of new internationally agreed basic safety standards with respect to NPP and related technologies. Recently issued new basic safety standards for radiation protection are introducing some new safety principles which may have essential impact on future licensing requirements regarding nuclear power plants and radioactive waste installations. These new standards recognize exposures under normal conditions ('practices') and intervention conditions. The term interventions describes the human activities that seek to reduce the existing radiation exposure or existing likelihood of incurring exposure which is not part of a controlled practice. The other new development in safety standards is the introduction of so called potential exposure based on the experience gained from a number of radiation accidents. This exposure is not expected to be delivered with certainty but it may result from an accident at a source or owing to an event or sequence of events of a probabilistic nature, including equipment failures and operating errors. (author)

  5. RM - ODP to express nuclear licensing

    International Nuclear Information System (INIS)

    Barbosa, E.A.; Martucci, M. Jr.

    2002-01-01

    The scope of CNEN (Comissao Nacional de Energia Nuclear) is established by standards and procedures, which allow one context where several activities for nuclear licensing are realized by persons, machines and other entities of real world and by software systems. The CNEN objectives for licensing nuclear installations can be specified and they define how the systems are consisted, its nature, and which important elements were considered relevant for its constitution. The behavior, where the software will be operated, was likely defined in this paper through all aspects of its business process, which means from its licensing context. The concepts and definition showed here defined one specifics business domain, through ODP context. The functionalities of nuclear licensing process, the relationship scope and the rules of interaction that contributed for to specify the nuclear licensing process were defined, too. Therefore, the definition of the domain follows the orientation of architecture concepts and allows to implement the reflection model, where, with the auxiliary from IDEF0 (Integration Definition for Function Modeling) diagrams, the interactions between extern domains were mapped

  6. SSM's licensing review of a spent nuclear fuel repository in Sweden

    International Nuclear Information System (INIS)

    Dverstorpand, Bjoern; Stroemberg, Bo

    2014-01-01

    On 16 March 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted license applications for a general license to construct, possess and operate a KBS-3 type spent nuclear fuel repository at the Forsmark site, in Oesthammar municipality, and an encapsulation plant in Oskarshamn municipality. The KBS-3 method, which has been developed by SKB over a period of more than 30 years, entails disposing of the spent fuel in copper canisters, surrounded by a swelling bentonite clay, at about 500 m depth in crystalline basement rock. SKB's applications are being evaluated in parallel by the Swedish Radiation Safety Authority (SSM) according to the Act on Nuclear Activities and by the Land and Environmental Court according to the Environmental Code. During the review SSM will act as an expert review body to the Land and Environmental Court in the areas of radiation protection, safety and security/non-proliferation. Both SSM and the court will produce a statement with a recommendation regarding a licensing decision and licensing conditions to the government. The government will make the final decision after consulting the municipalities concerned by SKB's facilities (municipal veto applies). The current licensing decision is just one of several licensing decisions that will be required for the repository. However it is arguably the most important one, because it is the last licensing stage with a broad societal involvement including an environmental impact assessment (EIA) process, national consultations and municipal veto for the concerned municipalities. The licensing steps to follow, should SKB be granted a license by the government, only require approval by SSM. These steps include application for start of actual construction work, test operation and routine operation. (authors)

  7. Comparative Analysis of Hydraulic Fracturing Wastewater Practices in Unconventional Shale Development: Newspaper Coverage of Stakeholder Concerns and Social License to Operate

    Directory of Open Access Journals (Sweden)

    Joel Gehman

    2016-09-01

    Full Text Available In this article we review prior literature regarding the concept of social license to operate, and related concepts, including corporate social responsibility, sustainable development, stakeholder management and cumulative effects. Informed by these concepts, we search for newspaper articles published in North American provinces and states where the Barnett, Duvernay, Marcellus and Montney shale plays are located. Using these data, we tabulate coverage of stakeholder concerns related to hydraulic fracturing and wastewater practices, and compare the extent to which these concerns vary over place and time. Our vocabulary analyses identify differences in the types and quantities of newspaper coverage devoted to concerns regarding hydraulic fracturing activities in general and wastewater practices in particular. We interpret these differences as suggesting that obtaining a social license to operate is likely not a one size fits all proposition. By understanding which stakeholder concerns are most salient in particular places and times, oil and gas operators and regulators can better tailor their strategies and policies to address local concerns. In other words, the findings from this study indicate that conventional understandings of risk as a technical or economic problem may not be adequate for dealing with unconventional resource challenges such as hydraulic fracturing. Operators and regulators may also need to manage social and cultural risks.

  8. 78 FR 66713 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-06

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . Action One Logistics, Inc..., Operating Manager (QI), Joseph Lam, Member, Application Type: New NVO License. Altex US, LLC (NVO & OFF), 1... President, Application Type: New NVO & OFF License. Andes Logistics USA LLC (NVO & OFF) 7500 NW 25 Street, 7...

  9. Safety evaluation report related to the renewal of the operating license for the Washington State University TRIGA reactor. Docket No. 50-27

    International Nuclear Information System (INIS)

    1982-05-01

    This Safety Evaluation Report for the application filed by the Washington State University (WSU) for a renewal of operating license number R-76 to continue to operate a research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the Washington State University and is located on the WSU campus in Pullman, Whitman County, Washington. The staff concludes that the TRIGA reactor facility can continue to be operated by WSU without endangering the health and safety of the public

  10. The role of reduced aerosol precursor emissions in driving near-term warming

    International Nuclear Information System (INIS)

    Gillett, Nathan P; Von Salzen, Knut

    2013-01-01

    The representative concentration pathway (RCP) scenarios all assume stringent emissions controls on aerosols and their precursors, and hence include progressive decreases in aerosol and aerosol precursor emissions through the 21st century. Recent studies have suggested that the resultant decrease in aerosols could drive rapid near-term warming, which could dominate the effects of greenhouse gas (GHG) increases in the coming decades. In CanESM2 simulations, we find that under the RCP 2.6 scenario, which includes the fastest decrease in aerosol and aerosol precursor emissions, the contribution of aerosol reductions to warming between 2000 and 2040 is around 30%. Moreover, the rate of warming in the RCP 2.6 simulations declines gradually from its present-day value as GHG emissions decrease. Thus, while aerosol emission reductions contribute to gradual warming through the 21st century, we find no evidence that aerosol emission reductions drive particularly rapid near-term warming in this scenario. In the near-term, as in the long-term, GHG increases are the dominant driver of warming. (letter)

  11. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  12. Environmental policy on the fixed-fee licensing of eco-technology under foreign penetration

    OpenAIRE

    Kim, Seung-Leul; Lee, Sang-Ho

    2016-01-01

    This study investigates environmental policy on the fixed-fee licensing strategy of clean eco-technology by an innovator having foreign ownership. We show that near-zero emission taxes accompanied by non-exclusive licensing regulation can improve social welfare when the cost gap is small or foreign penetration is high. However, when foreign ownership is not high, exclusive licensing regulations with an appropriate emission tax policy may improve social welfare.

  13. License - Society Catalog | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Society Catalog License License to Use This Database Last updated : 2012/01/17 You may use this database...es the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attri...bution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as...is found here . With regard to this database, you are licensed to: freely access part or whole of this database

  14. Benchmark for license plate character segmentation

    Science.gov (United States)

    Gonçalves, Gabriel Resende; da Silva, Sirlene Pio Gomes; Menotti, David; Shwartz, William Robson

    2016-09-01

    Automatic license plate recognition (ALPR) has been the focus of many researches in the past years. In general, ALPR is divided into the following problems: detection of on-track vehicles, license plate detection, segmentation of license plate characters, and optical character recognition (OCR). Even though commercial solutions are available for controlled acquisition conditions, e.g., the entrance of a parking lot, ALPR is still an open problem when dealing with data acquired from uncontrolled environments, such as roads and highways when relying only on imaging sensors. Due to the multiple orientations and scales of the license plates captured by the camera, a very challenging task of the ALPR is the license plate character segmentation (LPCS) step, because its effectiveness is required to be (near) optimal to achieve a high recognition rate by the OCR. To tackle the LPCS problem, this work proposes a benchmark composed of a dataset designed to focus specifically on the character segmentation step of the ALPR within an evaluation protocol. Furthermore, we propose the Jaccard-centroid coefficient, an evaluation measure more suitable than the Jaccard coefficient regarding the location of the bounding box within the ground-truth annotation. The dataset is composed of 2000 Brazilian license plates consisting of 14000 alphanumeric symbols and their corresponding bounding box annotations. We also present a straightforward approach to perform LPCS efficiently. Finally, we provide an experimental evaluation for the dataset based on five LPCS approaches and demonstrate the importance of character segmentation for achieving an accurate OCR.

  15. TMI-2 Lessons Learned Task Force status report and short-term recommendations

    International Nuclear Information System (INIS)

    1979-07-01

    Review of the Three Mile Island accident by the TMI-2 Lessons Learned Task Force has disclosed a number of actions in the areas of design and analysis and plant operations that the Task Force recommends be required in the short term to provide substantial additional protection which is required for the public health and safety. All nuclear power plants in operation or in various stages of construction or licensing action are affected to varying degrees by the specific recommendations. The Task Force is continuing work in areas of general safety criteria, systems design requirements, nuclear power plant operations, and nuclear power plant licensing

  16. Near-term hybrid vehicle program, phase 1

    Science.gov (United States)

    1979-01-01

    The preliminary design of a hybrid vehicle which fully meets or exceeds the requirements set forth in the Near Term Hybrid Vehicle Program is documented. Topics addressed include the general layout and styling, the power train specifications with discussion of each major component, vehicle weight and weight breakdown, vehicle performance, measures of energy consumption, and initial cost and ownership cost. Alternative design options considered and their relationship to the design adopted, computer simulation used, and maintenance and reliability considerations are also discussed.

  17. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  18. Landmine policy in the near-term: a framework for technology analysis and action

    Energy Technology Data Exchange (ETDEWEB)

    Eimerl, D., LLNL

    1997-08-01

    Any effective solution to the problem of leftover landmines and other post-conflict unexploded ordnance (UXO) must take into account the real capabilities of demining technologies and the availability of sufficient resources to carry out demining operations. Economic and operational factors must be included in analyses of humanitarian demining. These factors will provide a framework for using currently available resources and technologies to complete this task in a time frame that is both practical and useful. Since it is likely that reliable advanced technologies for demining are still several years away, this construct applies to the intervening period. It may also provide a framework for utilizing advanced technologies as they become available. This study is an economic system model for demining operations carried out by the developed nations that clarifies the role and impact of technology on the economic performance and viability of these operations. It also provides a quantitative guide to assess the performance penalties arising from gaps in current technology, as well as the potential advantages and desirable features of new technologies that will significantly affect the international community`s ability to address this problem. Implications for current and near-term landmine and landmine technology policies are drawn.

  19. Licensing of the TRIGA Mark III reactor at the Mexican Nuclear Centre

    International Nuclear Information System (INIS)

    Ramirez, R.M.; Arrendondo, R.R.

    1990-01-01

    The TRIGA Mark III reactor at the Mexican Nuclear Centre went critical in 1968 and remained so until 1979 when the National Commission for Nuclear Safety and Safeguards (CNSNS), the Mexican regulatory authority, was set up. The reactor was therefore operating without a formal operating license, and the CNSNS accordingly requested the ININ to license the reactor under the existing conditions and to ensure that any modification of the original design complied with Standards ANSI/ANS-15 and with the code of practice set out in IAEA Safety Series No. 35. The most relevant points in granting the operating licence were: (a) the preparation of the Safety Report; (b) the formulation and application of the Quality Assurance Programme; (c) the reconditioning of the following reactor systems: the cooling systems; the ventilation and exhaust system; the monitoring system and control panel; (d) the training of the reactor operating staff at junior and senior levels; and (e) the formulation of procedures and instructions. Once the provisional operating license was obtained for the reactor it was considered necessary to modify the reactor core, which has been composed of 20% enriched standards fuel, to a mixed core based on a mixture of standard fuel and FLIP-type fuel with 70% 235 U enrichment. The CNSNS therefore requested that the mixed core be licensed and a technical report was accordingly annexed to the Safety Report, its contents including the following subjects: (a) neutron analysis of the proposed configuration; (b) reactor shutdown margins; (c) accident analysis; and (d) technical specifications. The licensing process was completed this year and we are now hoping to obtain the final operating license

  20. Licensing issues associated with the use of computers in the nuclear industry

    International Nuclear Information System (INIS)

    Ehrenberger, W.D.; Bloomfield, R.E.

    1987-01-01

    Computers are increasingly important to ensuring the safety of nuclear power stations. They have been proposed or introduced into operator information systems, operational control systems, as well as into systems for core protection and plant protection. Although the developments in the individual countries are not at the same pace, they do tend to render similar results. Particular licensing problems arise because of the increasing complexity of computer systems and the software involved. In the past licensing has been closely connected with the mental understanding of the systems to be licensed. This understanding is endangered with greater complexity of the systems. Although several ''manual'' methods of licensing exist, the problem of cost effective licensing is still more or less unsolved. For the future it is expected that tools will reduce the licensing efforts leaving the licenser and assessor free to concentrate on the most important issues. Such tools will probably make use of artificial intelligence techniques. They will enable the inclusion of more complex functions into safety systems and thereby increase the number of safety criteria and the number of echelons od defense. Another important use of artificial intelligence techniques will be the area of operator information systems and maintenance, including computer hardware maintenance. They will provide early detection of problems in the plant and thereby largely enhance plant availability and safety. Further studies are being proposed in the fields of software licensing tools, artificial intelligence, fail-safe and fault-tolerant software architectures, test procedures and system specification

  1. Whom to Choose as License Partner?

    DEFF Research Database (Denmark)

    Laursen, Keld; Reichstein, Toke; Trombini, Giulia

    2013-01-01

    benefits and obviate issues related to technology transfer and knowledge recombination. At the same time, firms wish to select a partner operating in a different product market to minimize competitive downside issues and to access other product markets, skills and resources. We contend interdependence...... between technology and market forces: if partners are market distant, the likelihood of technology license contractual partnership decreases with partners’ technological distance. Using data on the formation of license partnerships in the global biopharmaceutical industry over the period 1994...

  2. Trends in CANDU licensing

    International Nuclear Information System (INIS)

    Snell, V.G.; Grant, S.D.

    1997-01-01

    Modern utilities view nuclear power more and more as a commodity - it must compete 'today' with current alternatives to attract their investment. With its long construction times and large capital investment, nuclear plants are vulnerable to delays once they have been committed. There are two related issues. Where the purchaser and the regulator are experienced in CANDU, the thrust is a very practical one: to identify and resolve major licensing risks at a very early stage in the project. Thus for a Canadian project, the designer (AECL) and the prospective purchaser would deal directly with the AECB. However CANDU has also been successfully licensed in other countries, including Korea, Romania, Argentina, India and Pakistan. Each of these countries has its own regulatory agency responsible for licensing the plant. In addition, however, the foreign customer and regulator may seek input from the AECB, up to and including a statement of licensability in Canada; this is not normally needed for a ''repeat'' plant and/or if the customer is experienced in CANDU, but can be requested if the plant configuration has been modified significantly from an already-operating CANDU. It is thus the responsibility of the designer to initiate early discussions with the AECB so the foreign CANDU meets the expectations of its customers

  3. Future of nuclear licensing

    International Nuclear Information System (INIS)

    Denton, H.R.

    1984-01-01

    The following topics are outlined: Comparison of US and best foreign experience in nuclear power plant construction and operation; Status of licensing and construction; Observed attributes; Reduced construction time; Fewer reactor trips; Higher capacity factor; Diesel generator reliability; Steam generator tube leakage; and US regulatory initiatives: NRC efforts and industry efforts

  4. Motorcycle Training for California Driver Licensing Personnel. Final Report.

    Science.gov (United States)

    California State Dept. of Motor Vehicles, Sacramento.

    The development of a 6-hour motorcycle course of instruction for personnel responsible for motorcycle licensing is described in this project report. The primary goals are stated and include (1) training driver licensing personnel in motorcycle safety and principles of operation, and (2) purchasing and installing appropriate motorcycle skill…

  5. Cryogenic distillation: a fuel enrichment system for near-term tokamak-type D-T fusion reactors

    International Nuclear Information System (INIS)

    Misra, B.; Davis, J.F.

    1980-02-01

    The successful operation and economic viability of deuterium-tritium- (D-T-) fueled tokamak-type commercial power fusion reactors will depend to a large extent on the development of reliable tritium-containment and fuel-recycle systems. Of the many operating steps in the fuel recycle scheme, separation or enrichment of the isotropic species of hydrogen by cryogenic distillation is one of the most important. A parametric investigation was carried out to study the effects of the various operating conditions and the composition of the spent fuel on the degree of separation. A computer program was developed for the design and analysis of a system of interconnected distillation columns for isotopic separation such that the requirements of near-term D-T-fueled reactors are met. The analytical results show that a distillation cascade consisting of four columns is capable of reprocessing spent fuel varying over a wide range of compositions to yield reinjection-grade fuel with essentially unlimited D/T ratio

  6. License - PGDBj - Ortholog DB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us PGDBj - Ortholog DB License License to Use This Database Last updated : 2017/03/07 You may use this database...cifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons A...ttribution-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...hare Alike 4.0 International is found here . With regard to this database, you are licensed to: freely acces

  7. 77 FR 3273 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2012-01-23

    ... Technology: Available for licensing is a novel method using short-term treatment with a glucocorticoid...: Licensing information and copies of the U.S. patent applications listed below may be obtained by writing to... into memory cells and terminally differentiated plasma cells. Moreover, IL-21 has anti-tumor activity...

  8. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  9. Nuclear fuel licensing requirements: present status and future trends

    International Nuclear Information System (INIS)

    Gantchev, T.; Vitkova, M.; Gorinov, I.; Datcheva, D.; Rashkova, N.

    2001-01-01

    The nuclear fuel licensing process must be directed to establishing of criteria for licensing (fuel safety criteria) and relationship between safety limits, technical specifications and operational conditions. This paper discusses the fuel safety criteria as used by NRC and Russian vendor. A survey on the available fuel behavior, modeling and related computer codes is given with respect to help the licensing process including new safety features of general changes in fuel design and operational conditions. Several types of computer codes that are used in safety analysis are sensitive to fuel-related parameters. The need for further code development and verification has been stated on many occasions: new design elements, such as different cladding materials, higher burnup, different fuel microstructure and use of MOX fuel can affect the performance of these codes. Regulatory inspection practices during operation and refueling in different countries are also shown. Future trends are discussed in particular with regard to the coming high burnup and to new core management schemes

  10. Licensing of MAPLE reactors in Canada

    International Nuclear Information System (INIS)

    Lee, A.G.; Labrie, J.P.; Langman, V.J.

    1999-01-01

    Full text: The Operating Licence for a MAPLE reactor (i.e., a 10 MW(th), pool-type reactor), has been approved by the Atomic Energy Control Board (AECB) on August 16th, 1999. This Operating Licence has been obtained within three years of the initiation of the MDS Nordion Medical Isotopes Reactor (MMIR) project, which entails the design, construction and commissioning of two 10 MW MAPLE reactors at AECL's Chalk River Laboratories. The scope and nature of the information required by the AECB, the licensing process and highlights of the events which led to successfully obtaining the Operating Licence for the MAPLE reactor are discussed. These discussions address all phases of the licensing process (i.e., the environmental assessment in support of siting, the Preliminary Safety Analysis Report, PSAR, in support of design, procurement and construction, the Final Safety Analysis Report, FSAR, in support of commissioning and operations, and the development of suitable quality assurance subprograms for each phase). An overview of some of the unique technical aspects associated with the MAPLE reactors, and how they have been addressed during the licensing process are also provided (e.g., applying CSA N285.0, General Requirements for Pressure-Retaining Systems and Components in CANDU Nuclear Power Plants, to a small, low pressure, low temperature research reactor, confirmation of the performance of the driver fuel via laboratory and/or in-reactor testing, validation of the computer codes used to perform the safety analyses, critical parameter uncertainty assessment, full scale hydraulic testing of the performance of the design, fuel handling, human factors validation, operator training and certification). (author)

  11. 30 CFR 56.12071 - Movement or operation of equipment near high-voltage power lines.

    Science.gov (United States)

    2010-07-01

    ...-voltage power lines. 56.12071 Section 56.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... NONMETAL MINES Electricity § 56.12071 Movement or operation of equipment near high-voltage power lines. When equipment must be moved or operated near energized high-voltage powerlines (other than trolley...

  12. Safety Culture Perspective. Managing the pre Managing the pre-operational phases of new NPPs and creating the safety culture

    International Nuclear Information System (INIS)

    Cowan, Pamela B.; Oh, Chaewoon; Dahlgren Persson, Kerstin; Carnino, Annick

    2008-01-01

    Nuclear safety is a key for the revival of nuclear energy future programmes. Lots of competent people will be needed worldwide for ensuring the safety of the installations both existing ones and future ones. Their expertise should range from design to operation, from regulatory role to operators, from fuel fabrication to waste disposal. The challenge in front of us will be to prepare for the right recruitment, the development of the needed expertise in order to face the demand in developed countries, in countries with economies in transition and in developing countries. Time allocated for the panel does not allow for covering all aspects but the panelists will cover some of the important aspects of the challenge in terms of needs, of new competencies, of learning from operation and licensing requirements including for new designs. The key objectives of the panel are: 1- Maintaining safe operation, learning from experience, licensing including aging management and re-licensing with safety improvements for existing installations: - Presentation by Junko Ogawa of the experience and lessons learned from the earthquake on Kashiwasaki Kariwa NPP: effects in terms of manpower involved in the investigation, effects on regulations and licensing, expertise used. - Presentation by Pamela Cowan of her experience in preparing licensing actions, regulatory compliance and interface with the Regulator for both operating plants and modern requirements for constructing new ones. 2 - Special training needed for the human aspect of safety: what are the challenges in areas of safety culture and management of safety: - Presentation by Chae Woon Oh of the Korean safety culture features developed nationally, at the regulator and at the operating organizations and their integration within the safety training programmes. - Presentation by Kerstin Dahlgren Person of the needs in terms of safety culture and safety management, in terms of expertise, practitioners and assessors. 3 - How to

  13. Safety Culture Perspective. Managing the pre Managing the pre-operational phases of new NPPs and creating the safety culture

    Energy Technology Data Exchange (ETDEWEB)

    Cowan, Pamela B. [Exelon Generation, 200 Exelon Way, 19348 Kennett Square, PA 19348 (United States); Oh, Chaewoon [Korea Institute of Nuclear Safety, 19 Gusung-Dong, Yuseong-Ku, 305-338 Daejeon (Korea, Republic of); Dahlgren Persson, Kerstin [International Atomic Energy Agency, Wagramer Strasse 5, PO BOX 100 A-1400 Vienna (Austria); Carnino, Annick [IAEA, Division of Nuclear Installation Safety, Wagramer Strasse 5, PO BOX 100 A-1400 Vienna (Austria)

    2008-07-01

    Nuclear safety is a key for the revival of nuclear energy future programmes. Lots of competent people will be needed worldwide for ensuring the safety of the installations both existing ones and future ones. Their expertise should range from design to operation, from regulatory role to operators, from fuel fabrication to waste disposal. The challenge in front of us will be to prepare for the right recruitment, the development of the needed expertise in order to face the demand in developed countries, in countries with economies in transition and in developing countries. Time allocated for the panel does not allow for covering all aspects but the panelists will cover some of the important aspects of the challenge in terms of needs, of new competencies, of learning from operation and licensing requirements including for new designs. The key objectives of the panel are: 1- Maintaining safe operation, learning from experience, licensing including aging management and re-licensing with safety improvements for existing installations: - Presentation by Junko Ogawa of the experience and lessons learned from the earthquake on Kashiwasaki Kariwa NPP: effects in terms of manpower involved in the investigation, effects on regulations and licensing, expertise used. - Presentation by Pamela Cowan of her experience in preparing licensing actions, regulatory compliance and interface with the Regulator for both operating plants and modern requirements for constructing new ones. 2 - Special training needed for the human aspect of safety: what are the challenges in areas of safety culture and management of safety: - Presentation by Chae Woon Oh of the Korean safety culture features developed nationally, at the regulator and at the operating organizations and their integration within the safety training programmes. - Presentation by Kerstin Dahlgren Person of the needs in terms of safety culture and safety management, in terms of expertise, practitioners and assessors. 3 - How to

  14. Future of Nuclear Power: NRC emergency preparedness licensing activities agenda

    International Nuclear Information System (INIS)

    Essig, T.H.

    1995-01-01

    This talk summary addresses the issue of how future policies of the NRC will affect nuclear power in areas such as construction, emergency preparedness, and licensing. Specific topics covered include the following: Emergent EP licensing issues for operating nuclear Power Plants; 10CFR Part 52 and the process for licensing of Advanced Light Water Reactors (ALWRs); and potential revisions to emergency preparedness programs for future nuclear power plants

  15. Safety Evaluation Report related to the renewal of the operating license for the research reactor at Manhattan College (Docket No. 50-199)

    International Nuclear Information System (INIS)

    1985-02-01

    This Safety Evaluation Report for the application filed by Manhattan College (MC) for a renewal of Operating License R-94 to continue to operate the MC 0.1-W open-pool training reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by MC and is located two blocks away from the MC main campus in the Riverdale area of New York City, New York. The staff concludes that the reactor facility can continue to be operated by MC without endangering the health and safety of the public

  16. License - Taxonomy Icon | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Taxonomy Icon License License to Use This Database Last updated : 2013/3/21 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion 2.1 Japan . If you use data from this database, please be sure attribute this database as follows: Taxon...ative Commons Attribution 2.1 Japan is found here . With regard to this database,

  17. Partner Selection in Technological Licensing Agreements

    DEFF Research Database (Denmark)

    Laursen, Keld; Trombini, Giulia

    This paper investigates the matching of seller and buyer firms in the market for technology licensing. By combining organizational learning theory with the industrial organization approach, we propose a matching model in which technological similarities in terms of relatedness and familiarity work...... that is technologically unrelated, ex ante familiarity with the licensors’ technology is required. We contend also that there is interdependence between technological learning and market competition: if partners are in the same product markets, the likelihood of technology license contractual partnerships decreases...

  18. Near-term technology policies for long-term climate targets--economy wide versus technology specific approaches

    International Nuclear Information System (INIS)

    Sanden, B.A.; Azar, Christian

    2005-01-01

    The aim of this paper is to offer suggestions when it comes to near-term technology policies for long-term climate targets based on some insights into the nature of technical change. We make a distinction between economy wide and technology specific policy instruments and put forward two key hypotheses: (i) Near-term carbon targets such as the Kyoto protocol can be met by economy wide price instruments (carbon taxes, or a cap-and-trade system) changing the technologies we pick from the shelf (higher energy efficiency in cars, buildings and industry, wind, biomass for heat and electricity, natural gas instead of coal, solar thermal, etc.). (ii) Technology specific policies are needed to bring new technologies to the shelf. Without these new technologies, stricter emission reduction targets may be considered impossible to meet by the government, industry and the general public, and therefore not adopted. The policies required to bring these more advanced technologies to the shelf are more complex and include increased public research and development, demonstration, niche market creation, support for networks within the new industries, standard settings and infrastructure policies (e.g., when it comes to hydrogen distribution). There is a risk that the society in its quest for cost-efficiency in meeting near-term emissions targets, becomes blindfolded when it comes to the more difficult, but equally important issue of bringing more advanced technologies to the shelf. The paper presents mechanisms that cause technology look in, how these very mechanisms can be used to get out of the current 'carbon lock-in' and the risk with premature lock-ins into new technologies that do not deliver what they currently promise. We then review certain climate policy proposals with regards to their expected technology impact, and finally we present a let-a-hundred-flowers-bloom strategy for the next couple of decades

  19. World oil market fundamentals - Part One: The near term outlook

    International Nuclear Information System (INIS)

    Dwarkin, J.; Morton, K.; Datta, R.

    1998-03-01

    Potential implications of a number of uncertainties currently affecting the world oil market are assessed. The influence of the interplay of geopolitical events on demand and supply, inventories, prices and price trends are reviewed. Reference prices which industry and governments can use for investment and policy evaluations are provided. In this volume, the emphasis is on near term developments, with a review of the uncertainties surrounding these projections. Three different scenarios are postulated for the near term, each one taking into account different levels of Iraqi exports during the period which would effect available inventories, and hence price. Depending on which of the three scenarios actually comes to pass, unless refiners are prepared to build up inventories well beyond seasonal norms, or producers shut in, the prevailing view is that oil prices will be under severe pressure during most of 1998 and 1999. Over the longer term, however, the analysis suggests that an average real value of US$18.00 - $18.50 per barrel remains a reasonable expectation as a sustainable price. 34 refs., tabs., figs

  20. The changing shape of U.S. licensing philosophy

    International Nuclear Information System (INIS)

    Remick, F.J.

    1992-01-01

    The shape of U.S. nuclear licensing and regulatory philosophy and process has already changed. The new process requires NRC review and approval of the vendor designs before a prospective utility license applicant purchases the design and begins construction. The new philosophy has resulted from the lessons learned from extensive operating experience accumulated in the United States. New criteria established for judging reactor designs include the capability of future designs to be more tolerant of accidents beyond the traditional design basis events. Qualitative and quantitative goals have been chosen as a guide for allocating resources for regulation of the currently operating plants. The changing shape of nuclear licensing and regulatory philosophy is also a result of economic circumstances in the United States. All will have a better opportunity to take part in the process which is most likely to encourage further development of safe nuclear energy in the United States. (author)

  1. Safety evaluation report related to the renewal of the operating license for the Zero-Power Reactor at Cornell University, Docket No. 50-97

    International Nuclear Information System (INIS)

    1983-09-01

    This Safety Evaluation Report for the application filed by Cornell University (CU) for a renewal of Operating License R-80 to continue to operate a zero-power reactor (ZPR) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by Cornell University and is located on the Cornell campus in Ithaca, New York. The staff concludes that the ZPR facility can continue to be operated by CU without endangering the health and safety of the public

  2. Experience in Cuba in the licensing during import, commissioning and operation of an Irradiator LLCo ISOGAMMA

    International Nuclear Information System (INIS)

    Forteza, Yamil Lopez; Reyes, Yolanda Perez; Garcia, Jose R. Quevedo; Molina, Igor I. Sarabia; Gonzalez, Leonel Omarovich; Zubiaur, Omar Cruz

    2013-01-01

    This work presented the experiences during the process of licensing an irradiator ISOGAMMA LLCo model according to the recommendations of the International Atomic Energy (IAEA). Aspects of the safety assessment are detailed, as well as control and verification requirements for radiation safety and security at different stages of the process (import, transportation, installation irradiator loading 60Co sources, commissioning and operation) of irradiator recently installed in Cuba. The results of the evaluation carried a source of reference and consultation necessary for the work of the regulator to consider for similar processes that lie ahead in other facilities irradiation

  3. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  4. License - PLACE | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us PLACE License License to Use This Database Last updated : 2014/07/17 You may use this database...ense terms regarding the use of this database and the requirements you must follow in using this database. The license for this datab...re Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as follows: ... ...re . With regard to this database, you are licensed to: freely access part or whole of this database, and ac...quire data; freely redistribute part or whole of the data from this database; and freely create and distribute database

  5. License - RMG | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RMG License License to Use This Database Last updated : 2013/08/07 You may use this database...se terms regarding the use of this database and the requirements you must follow in using this database. The license for this databas... Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as follows: Ric...Japan is found here . With regard to this database, you are licensed to: freely access part or whole of this database..., and acquire data; freely redistribute part or whole of the data from this database; and freely create and distribute datab

  6. Licensing biotech intellectual property in university-industry partnerships.

    Science.gov (United States)

    Drozdoff, Vladimir; Fairbairn, Daryl

    2015-01-20

    Appropriate negotiation and drafting of license agreements are critical to successfully establishing and managing the expansive and complex relationships that are becoming more common between industry and universities. More often than not, the resulting licensing agreements become quite lengthy and complex, and the key principles become difficult to discern among all the details. This summary provides a short, nonexhaustive introduction to some of the essential components of these licenses with the intent of providing the non-licensing professional a better appreciation of some of the key commercial and legal terms from both an academic and company perspective, keeping in mind some of the considerations that particularly apply to biotechnology deals. Copyright © 2015 Cold Spring Harbor Laboratory Press; all rights reserved.

  7. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  8. Safety Evaluation Report related to the renewal of the operating license for the research reactor at Purdue University: Docket No. 50-182

    International Nuclear Information System (INIS)

    1988-04-01

    This Safety Evaluation Report for the application filed by Purdue University for a renewal of Operating License R-87 to continue to operate a research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned by Purdue University and is located on the campus in West Lafayette, Indiana. On the basis of its technical review, the staff concludes that the reactor facility can continue to be operated by the university without endangering the health and safety of the public or the enviroment

  9. NRC Licensing Status Summary Report for NGNP

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kinsey, James Carl [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  10. License - RGP gmap98 | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP gmap98 License License to Use This Database Last updated : 2015/02/12 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as foll...on-Share Alike 2.1 Japan is found here . With regard to this database, you are licensed to: freely access part or whole of this datab

  11. License - ChIP-Atlas | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us ChIP-Atlas License License to Use This Database Last updated : 2016/06/24 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...national is found here . With regard to this database, you are licensed to: freely access part or whole of this database

  12. Presentation of reports for licensing of industrial irradiators

    International Nuclear Information System (INIS)

    2000-04-01

    This Regulation refers to the requirements of the Regulation CNEN-NE.6.02. 'Licensing of Radioactive Facilities', expressed in the section 6 related to the information for Previous Approval, in the subsection 7.2 related to the information for the Construction Licensing and in the subsection 9.2, related to the information for the Authorization for operation, for the specific case of industrial irradiators

  13. License - Budding yeast cDNA sequencing project | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Budding yeast cDNA sequencing project License to Use This Database Last updated : 2010/02/15 You may use this databas...ional License described below. The Standard License specifies the license terms regarding the use of this database... and the requirements you must follow in using this database. The Additiona...n the Standard License. Standard License The Standard License for this database is the license specified in ...the Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database

  14. Conceptual design plan near-surface test facility: Phase II, Project B-300b

    International Nuclear Information System (INIS)

    Heneveld, W.H.; Mack, R.J.

    1979-01-01

    Activities are reported in programs devoted to demonstration and development of techniques for the safe placement and retrieval of the spent fuel canisters in a near-surface flow of the Columbia River Basalt. Other programs are reported designed to determine whether there are any unacceptable effects resulting from the interaction of the nuclear waste and basalt and to provide information to be used for near-term validation of the current numerical design models of the repository. Work is also reported on development of a data base for the design, construction, and licensing of a permanent large-scale basalt repository

  15. Regulations and the licensing process in Austria

    International Nuclear Information System (INIS)

    Matulla, Herbert U.

    1979-01-01

    A review of the licensing process which took place from 1971 to 1978 shows which laws, regulations and standards were used in checking the safety aspects of the nuclear power plant and which organisations participated in the licensing process. The internal organisation of the Austrian main-expert in the procedure is illustrated. Examples of detail-work are explained. The importance of intensive co-operation of the different technical groups and the problems of comparable examination depth are underlined. (author)

  16. Near-term and next-generation nuclear power plant concepts

    International Nuclear Information System (INIS)

    Shiga, Shigenori; Handa, Norihiko; Heki, Hideaki

    2002-01-01

    Near-term and next-generation nuclear reactors will be required to have high economic competitiveness in the deregulated electricity market, flexibility with respect to electricity demand and investment, and good public acceptability. For near-term reactors in the 2010s, Toshiba is developing an improved advanced boiling water reactor (ABWR) based on the present ABWR with newly rationalized systems and components; a construction period of 36 months, one year shorter than the current period; and a power lineup ranging from 800 MWe to 1,600 MWe. For future reactors in the 2020s and beyond, Toshiba is developing the ABWR-II for large-scale, centralized power sources; a supercritical water-cooled power reactor with high thermal efficiency for medium-scale power sources; a modular reactor with siting flexibility for small-scale power sources; and a small, fast neutron reactor with inherent safety for independent power sources. From the viewpoint of efficient uranium resource utilization, a low-moderation BWR core with a high conversion factor is also being developed. (author)

  17. License plate recognition using DTCNNs

    NARCIS (Netherlands)

    ter Brugge, M.H; Stevens, J.H; Nijhuis, J.A G; Spaanenburg, L; Tavsanonoglu, V

    1998-01-01

    Automatic license plate recognition requires a series of complex image processing steps. For practical use, the amount of data to he processed must be minimized early on. This paper shows that the computationally most intensive steps can be realized by DTCNNs. Moreover; high-level operations like

  18. Improving the Business Trade Licensing Reform Environment

    OpenAIRE

    Gamser, Matthew

    2003-01-01

    This case study of Kenyan business trade licensing shows that red-tape costs can be cut if reform is championed strongly and there is a strong case in terms of costs and benefits. The reform of business registration, trade licensing and other business entry procedures is a cost effective and progressive way to promote indigenous private sector development. But, reform needs more than good cost-benefit analysis and legal drafting; it also requires building constituencies and continuous advocacy.

  19. Recidivism Among Licensed-Released Prisoners Who Participated in the EM Program in Israel.

    Science.gov (United States)

    Shoham, Efrat; Yehosha-Stern, Shirley; Efodi, Rotem

    2015-08-01

    Toward the end of 2006, a pilot program was launched in Israel wherein licensed-released prisoners were put under electronic monitoring (EM). In addition to EM, the pilot program, operated by the Prisoners' Rehabilitation Authority, provides programs of occupational supervision and personal therapy and is designed to allow for early release of those prisoners who, without increased supervision, would have been found unsuitable for early release. The aim of this study was to ascertain whether participation in the EM program among licensed-released prisoners in Israel might bring about lessened recidivism. For that matter, rates of arrests and incarceration were examined during a follow-up period of up to 4 years, among the entirety of licensed-released prisoners participating in the EM program between the years 2007 and 2009 (n = 155). To compare recidivism rates, a control group was assembled from among the entirety of released prisoners who were found unsuitable for early release in judicial conditions, and had therefore served the full term of their incarceration, to be released between the years 2005 and 2006 (a period of time during which an EM program was not yet operated among licensed-released prisoners in Israel). Study findings clearly show that while among the control group, 42% of released prisoners were re-incarcerated, at the end of a 4-year follow-up period, only 15% among the study group had returned to prison. These findings can be explained by combining the Social Control theory and the Self-Control theory which consider the period of time under EM program and the occupational and familial integration tools for reducing criminal connections and enhancing pro-social behavior. © The Author(s) 2014.

  20. License - TMBETA-GENOME | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TMBETA-GENOME License License to Use This Database Last updated : 2015/03/09 You may use this database... the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribu...tion-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as f....1 Japan . The summary of the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database

  1. License - KAIKOcDNA | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us KAIKOcDNA License License to Use This Database Last updated : 2014/10/08 You may use this database... license terms regarding the use of this database and the requirements you must follow in using this database...-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as follo...e Alike 2.1 Japan is found here . With regard to this database, you are licensed to: freely access part or whole of this database..., and acquire data; freely redistribute part or whole of the data from this database; a

  2. License - RGP caps | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP caps License License to Use This Database Last updated : 2015/05/12 You may use this database...license terms regarding the use of this database and the requirements you must follow in using this database...Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as follow...ommons Attribution-Share Alike 2.1 Japan is found here . With regard to this database, you are licensed to: ...freely access part or whole of this database, and acquire data; freely redistribute part or whole of the data from this database

  3. License - DB-SPIRE | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us DB-SPIRE License License to Use This Database Last updated : 2017/02/16 You may use this database...license terms regarding the use of this database and the requirements you must follow in using this database...Share Alike 4.0 International . If you use data from this database, please be sure attribute this database a...eative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database, you a...re licensed to: freely access part or whole of this database, and acquire data; freely redistribute part or

  4. License - RGP physicalmap | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP physicalmap License License to Use This Database Last updated : 2015/07/07 You may use this database...es the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attri...bution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as...ry of the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database, y

  5. Licensing the California low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Dressen, A.L.; Serie, P.J.; Junkert, R.

    1992-01-01

    California has made significant progress toward the issuance of a license to construct and operate the Southwestern Compact's low-level radioactive waste disposal facility. However, obstacles to completing construction and preparing to receive waste still exist. This paper will describe the technical licensing issues, EIR/S process, political events, and public interactions that have impacted on California regulators' ability to complete the license application review and reach a decision on issuing a license. Issues associated with safely and liability evaluations, finalization of the environmental impact report, and land transfer processes involving multiple state, federal, and local agencies will be identified. Major issues upon which public and political opposition is focusing will also be described. (author)

  6. The licensing process of the design modifications of Cernavoda 2 NPP resulting from the operating experience of CANDU plants

    International Nuclear Information System (INIS)

    Goicea, L.

    2005-01-01

    The CANDU 6 plant now under construction in Cernavoda include over two hundred significant improvements made in order to comply with current codes and standards and licensing requirements relative to the operating CANDU 6 in Romania. These evolutionary improvements are incorporated in CANDU 6 design taking advance of CANDU operating experience, of the designer company research and development and technical advances worldwide in order to further enhance safety, reliability and economics. This paper gives a general idea of the evaluation of the modifications of the Cernavoda 2 nuclear power plant against the design of Cernavoda 1 and states the safety principles and requirements which are the basis for this evaluation. (author)

  7. Myanmar exploration hitting stride on 1989-90 licensing round blocks

    International Nuclear Information System (INIS)

    Khin, J.A.; Johnston, D.

    1992-01-01

    This paper reports that following licensing efforts in 1989-90, Myanmar has been gearing up with activity both onshore and offshore. The industry gave a strong response to the first round of exploration licensing. The license awards in the first round carried fairly aggressive work commitments in terms of both dollars and timing. Work commitments on each of the first nine blocks ranged from $12 million to $70 million for each block. Most companies committed to spudding their first wells within the first 12-14 months. The drilling results are starting to come in. Although no significant oil discovery has been made yet, the country expects to speed up its exploration activities in the next few years. Following the first round of licensing onshore, Myanmar Oil and Gas Enterprise (MOGE), the national oil company, is negotiating terms for offshore blocks as well as additional onshore blocks for improved oil recovery (IOR) and rehabilitation/redevelopment rights for existing fields

  8. Institutional considerations for near-surface land disposal

    International Nuclear Information System (INIS)

    Gustafson, P.F.

    1989-01-01

    This chapter discusses the federal and state responsibilities for low level radioactive waste and the laws and policies that have been enacted to define those responsibilities. Historical perspective is given on the intent by both Congress and the Atomic Energy Commission to keep all nuclear activity other than regulating and licensing in the private sector. The Low Level Waste Policy Act of 1980 and the 1985 Amendments are described along with the ramifications for states. Individual state approaches and regional compacts for LLW management are examined and the following general issues common to all endeavors are considered: Public involvement, Management plans, Economic viability, Site selection criteria, Site acceptance incentives, Disposal technology, Selection of site operator, and Site ownership. Finally, licensing and other regulatory responsibilities; site closure, long-term ownership, and fiscal responsibility; unresolved issues; and flaws in the present compact alignments are discussed

  9. AV Licensing Brings Kids & Media Together

    Science.gov (United States)

    Watson, Elizabeth; Maloney, Brenda D.

    1975-01-01

    The Fitchburg, Massachusetts, Public Library holds training sessions for children on the use of audiovisual equipment, and licenses children who have learned how to operate the equipment so they may check it out and take it home. (LS)

  10. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Science.gov (United States)

    2013-06-20

    ... Environmental Reports for Nuclear Power Plant License Renewal Applications AGENCY: Nuclear Regulatory Commission... for Nuclear Power Plant License Renewal Applications.'' This regulatory guide provides guidance to... renewal of a nuclear power plant operating license. Applicants should use this regulatory guide when...

  11. Sodium Fast Reactor Safety and Licensing Research Plan

    International Nuclear Information System (INIS)

    Denman, M.; Lachance, J.; Sofu, T.; Bari, R.; Flanagon, G.; Wigeland, R.

    2015-01-01

    This paper summarizes potential research priorities for the US Department of Energy (DOE) with the intent of improving the licensability of the sodium cooled fast reactor (SFR). In support of this project, five panels were tasked with identifying potential safety related gaps in the available information, data and models needed to support the licensing of an SFR. The areas examined were sodium technology; accident sequences and initiators; source term characterization, codes and methods; and fuels and materials. It is the intent of this paper to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the applied technology access control designation from old documents. The second cross-cutting gap is the need for a robust knowledge management and preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with applied technology and knowledge management. (author)

  12. Near-term benefits of life extension planning for nuclear power plants

    International Nuclear Information System (INIS)

    Pickens, T.; Gregor, F.E.

    1988-01-01

    Life Extension of Nuclear Power Plants is now viewed as a realistic alternative to construction of new generating facilities. The subject has been under intensive study since 1984 and two comprehensive pilot plant programs have been completed under EPRI, U.S. Department of Energy and utility sponsorship. A major lesson learned from these studies is that planning for life extension must start early and that many activities must be implemented as early in life as possible to enhance the option for life extension through mitigate and preventive actions. It was also determined that achievement of a 40-year licensed life is by no means guaranteed without substantial effort during the remaining plant life. In examining these recommended actions, it becomes obvious that conscientious implementation also leads to realization of significant short-term benefits in the form of availability improvement, outage reduction, maintenance optimization and longer term planning decisions. In addition to the economic benefits, plant safety is also enhanced by reducing challenges to the safety systems and slowly switching from a corrective maintenance to a preventive maintenance program

  13. Glosario de términos utilizados en las licencias de revistas electrónicas Glossary of terms used for electronic journals licenses

    Directory of Open Access Journals (Sweden)

    Susana Romanos de Tiratel

    2006-12-01

    Full Text Available Se presentan dos listados del vocabulario utilizado en la redacción de licencias para acceder a revistas electrónicas: 1 los términos en español con sus equivalencias en inglés seguidas de sus definiciones y 2 los términos en inglés con sus equivalencias en español.Two lists of the vocabulary use for the writing of a license to access electronic journals are presented: 1 terms in both Spanish and English followed by their corresponding definition; 2 terms in English followed by their equivalent terms in Spanish.

  14. Safety Evaluation Report related to the renewal of the operating license for the research reactor at Michigan State University (Docket No. 50-294)

    International Nuclear Information System (INIS)

    1984-08-01

    This Safety Evaluation Report for the application filed by the Michigan State University (MSU) for a renewal of operating license number R-114 to continue to operate the TRIGA Mark I research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the Michigan State University and is located on the campus of Michigan State University in East Lansing, Ingham County, Michigan. The staff concludes that the TRIGA reactor facility can continue to be operated by MSU without endangering the health and safety of the public

  15. Issues related to the licensing of final disposal facilities for radioactive waste

    International Nuclear Information System (INIS)

    Medici, M.A.; Alvarez, D.E.; Lee Gonzales, H.; Piumetti, E.H.; Palacios, E.

    2010-01-01

    The licensing process of a final disposal facility for radioactive waste involves the design, construction, pre-operation, operation, closure and post closure stages. While design and pre-operational stages are, to a reasonable extent, similar to other kind of nuclear or radioactive facilities, construction, operation, closure and post-closure of a radioactive waste disposal facility have unique meanings. As consequence of that, the licensing process should incorporate these particularities. Considering the long timeframes involved at each stage of a waste disposal facility, it is convenient that the development of the project being implemented in and step by step process, be flexible enough as to adapt to new requirements that would arise as a consequence of technology improvements or due to variations in the socio-economical and political conditions. In Argentina, the regulatory Standard AR 0.1.1 establishes the general guideline for the 'Licensing of Class I facilities (relevant facilities)'. Nevertheless, for radioactive waste final disposal facilities a new specific guidance should be developed in addition to the Basic Standard mentioned. This paper describes the particularities of final disposal facilities indicating that a specific licensing system for this type of facilities should be foreseen. (authors) [es

  16. Development of the methodology for application of revised source term to operating nuclear power plants in Korea

    International Nuclear Information System (INIS)

    Kang, M.S.; Kang, P.; Kang, C.S.; Moon, J.H.

    2004-01-01

    Considering the current trend in applying the revised source term proposed by NUREG-1465 to the nuclear power plants in the U.S., it is expected that the revised source term will be applied to the Korean operating nuclear power plants in the near future, even though the exact time can not be estimated. To meet the future technical demands, it is necessary to prepare the technical system including the related regulatory requirements in advance. In this research, therefore, it is intended to develop the methodology to apply the revised source term to operating nuclear power plants in Korea. Several principles were established to develop the application methodologies. First, it is not necessary to modify the existing regulations about source term (i.e., any back-fitting to operating nuclear plants is not necessary). Second, if the pertinent margin of safety is guaranteed, the revised source term suggested by NUREG-1465 may be useful to full application. Finally, a part of revised source term could be selected to application based on the technical feasibility. As the results of this research, several methodologies to apply the revised source term to the Korean operating nuclear power plants have been developed, which include: 1) the selective (or limited) application to use only some of all the characteristics of the revised source term, such as release timing of fission products and chemical form of radio-iodine and 2) the full application to use all the characteristics of the revised source term. The developed methodologies are actually applied to Ulchin 9 and 4 units and their application feasibilities are reviewed. The results of this research are used as either a manual in establishing the plan and the procedure for applying the revised source term to the domestic nuclear plant from the utility's viewpoint; or a technical basis of revising the related regulations from the regulatory body's viewpoint. The application of revised source term to operating nuclear

  17. Atomic Safety and Licensing Board Panel annual report, fiscal year 1989

    International Nuclear Information System (INIS)

    Cotter, B.P. Jr.

    1990-07-01

    In Fiscal Year 1989, the Atomic Safety and Licensing Board Panel (ASLBP) handled 40 proceedings involving the construction, operation and maintenance of commercial nuclear power reactors or other activities requiring a license from the Nuclear Regulatory Commission. This report summarizes, highlights and analyzes how the wide-ranging issues raised in these proceedings were addressed by the Judges and Licensing Boards of the ASLBP during the year. 5 figs., 3 tabs

  18. Towards Harmonious Coexistence in the Unlicensed Spectrum: Rational Cooperation of Operators.

    Science.gov (United States)

    Bae, Sunghwan; Kim, Hongseok

    2017-10-24

    5G New Radio (NR) operating in the unlicensed spectrum is accelerating the Fourth Industrial Revolution by supporting Internet of Things (IoT) networks or Industrial IoT deployments. Specifically, LTE-Advanced (LTE-A) is looking to achieve spectrum integration through coexistence with multi-radio access technology (RAT) systems in the same unlicensed bands with both licensed-assisted and stand-alone access. The listen-before-talk (LBT) mechanism is mainly considered to enable an LTE operator to protect other incumbent unlicensed systems. In this article, we investigate the behaviors of multiple LTE operators along with the deployment of WiFi networks in the unlicensed spectrum from both short- and long-term points of view. In countries without mandatory LBT requirements, we show that an LTE operator is susceptible to collusion with another LTE operator, thus exploiting scarce spectrum resources by deceiving other wireless networks into thinking that channels are always busy; hence, mandatory usage of LTE with LBT is highly recommended at national level to achieve harmonious coexistence in the unlicensed spectrum. We discuss several possible coexistence scenarios to resolve the operator's dilemmaas well as to improve unlicensed spectrum efficiency among multi-RAT systems, which is viable in the near future.

  19. Safety evaluation report related to the renewal of the operating license for the research reactor at the University of Florida. Docket No. 50-83

    International Nuclear Information System (INIS)

    1982-05-01

    This Safety Evaluation Report for the application filed by the University of Florida (UF) for a renewal of Operating License R-56 to continue to operate its Argonaut-type research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the University of Florida and is located on the UF campus in Gainesville, Alachua County, Florida. The staff concludes that the reactor facility can continue to be operated by UF without endangering the health and safety of the public

  20. Terms and conditions of use” for journal articles and scholarly journals : A survey on the licensing processes associated with electronic scholarly materials

    Science.gov (United States)

    Hidaka, Masako

    Copyright policies and terms directly affect the approach taken by journal editors, authors and readers regarding dealing with of articles and/or copyrighted materials. However Japanese academic society publishers have some trouble in licensing processes for copyrighted materials as previous studies pointed out. In 2011 we conducted a survey on “terms and conditions of use” of electronic journal and the licensing practices associated with electronic scholarly materials. The survey showed commercial publishers have enough announcements on reuse of copyrighted materials for readers. On the other hand Japanese academic societies' cares for readers tend to not enough. They publish journals both in Japanese and in English. Subsequently, English and Japanese templates of “terms and conditions of use” for Japanese academic society publishers were proposed. The templates were developed based on an understanding of the International Association of Scientific, Technical and Medical Publishers' “STM Permissions Guidelines,” which were designed to establish a standard and reasonable approach to granting permission for republication to all signatory publishers.The survey showed that Japanese academic society publishers and commercial publishers are facing the same issues regarding acceptable use of electronic supplemental materials for journal articles. This issue remains to be solved.

  1. License - MicrobeDB.jp | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us MicrobeDB.jp License License to Use This Database Last updated : 2017/06/29 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database... Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database, yo

  2. License - NBDC NikkajiRDF | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us NBDC NikkajiRDF License License to Use This Database Last updated : 2015/05/29 You may use this database...es the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attri...bution 2.1 Japan . If you use data from this database, please be sure attribute this database as follows: NB... the Creative Commons Attribution 2.1 Japan is found here . With regard to this database

  3. License - RED II INAHO | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RED II INAHO License License to Use This Database Last updated : 2016/01/14 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...of the Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database

  4. License - Arabidopsis Phenome Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Arabidopsis Phenome Database License License to Use This Database Last updated : 2017/02/27 You may use this database...cense specifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative ...Commons Attribution-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...ative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database, you ar

  5. License - Togo Picture Gallery | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Togo Picture Gallery License License to Use This Database Last updated : 2017/05/16 You may use this database...ecifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons ...Attribution 4.0 International . If you use data from this database, please be sure attribute this database a...e Creative Commons Attribution 4.0 International is found here . With regard to this database

  6. Lessons learned from the licensing process and the operational performance of the important to safety digital application implemented at the Mexican nuclear facilities

    International Nuclear Information System (INIS)

    Ledesma-Carrion, R.

    1998-01-01

    This paper describes the main concerns detected during the licensing processes performed by the Mexican Nuclear Regulatory Commission (CNSNS) for the NUMAC-PRNM, the Integrated Computer Systems at the Laguna Verde Nuclear Power Station (LVNPS) and for the Digital Control Console of the Triga Mark III Research Reactor (TMRR). The review and approval process was performed following the guidelines of the US Nuclear Regulatory Commission (USNRC); the regulatory frame applied includes the Code of Federal Regulation (10CFR50), some Regulatory Guides, such as: RG 1.152, RG 1.153, some Industrial Standards, for example: IEEE-279, IEEE-603, IEEE-7.4.3-2. Also, based on the operational experience taken from the LVNPS License Event Report (LER) reported under the 10CFR50.72 and 10CFR50.73 USNRC rules, and from the Report of Events to be Analyzed (REA) issued for a CNSNS agreement with the utility stated by the necessity to determine failure rates of digital equipment, some case studies and a preliminary failure cause classification is shown. The Event Report evaluation covered topics related to the software, hardware and firmware issues. Finally, the lessons learned from the licensing assessments and from the operational experience of the digital applications implemented are presented. It will also give the regulatory activities related to an IAEA international cooperation project on I and C digital upgrade concerns. (author)

  7. Licensing of HTGRs in the United States

    International Nuclear Information System (INIS)

    Fisher, C.R.; Orvis, D.D.

    1981-01-01

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented. (author)

  8. Licensing of HTGRs in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, C. R.; Orvis, D. D. [General Atomic Co., San Diego, CA (USA)

    1981-01-15

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented.

  9. Safety evaluation report related to the renewal of the operating license for the University of New Mexico Research Reactor (Docket No. 50-252)

    International Nuclear Information System (INIS)

    1987-03-01

    This Safety Evaluation Report for the application filed by the University of New Mexico (UNM) for renewal of Operating License No. R-102 to continue to operate its research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located on the campus of the University of New Mexico in Albuquerque, New Mexico. The staff concludes that the reactor can continue to be operated by the University of New Mexico without endangering the health and safety of the public. 7 refs., 7 figs., 2 tabs

  10. Safety Evaluation Report related to the renewal of the operating license for the General Electric-Nuclear Test Reactor (GE-NTR) (Docket No. 50-73)

    International Nuclear Information System (INIS)

    1984-09-01

    This Safety Evaluation Report for the application filed by the General Electric Company (GE) for a renewal license number R-33 to continue to operate its research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by GE and is located in Pleasanton, California. The staff concludes that the reactor can continue to be operated by GE without endangering the health and safety of the public

  11. AP1000 will meet the challenges of near-term deployment

    International Nuclear Information System (INIS)

    Matzie, Regis A.

    2008-01-01

    The world demand for energy is growing rapidly, particularly in developing countries that are trying to raise the standard of living for billions of people, many of whom do not have access to electricity or clean water. Climate change and the concern for increased emissions of green house gases have brought into question the future primary reliance of fossil fuels. With the projected worldwide increase in energy demand, concern for the environmental impact of carbon emissions, and the recent price volatility of fossil fuels, nuclear energy is undergoing a rapid resurgence. This 'nuclear renaissance' is broad based, reaching across Asia, North America, Europe, as well as selected countries in Africa and South America. Many countries have publicly expressed their intentions to pursue the construction of new nuclear energy plants. Some countries that have previously turned away from commercial nuclear energy are reconsidering the advisability of this decision. This renaissance is facilitated by the availability of more advanced reactor designs than are operating today, with improved safety, economy, and operations. One such design, the Westinghouse AP1000 advanced passive plant, has been a long time in the making! The development of this passive technology started over two decades ago from an embryonic belief that a new approach to design was needed to spawn a nuclear renaissance. The principal challenges were seen as ensuring reactor safety by requiring less reliance on operator actions and overcoming the high plant capital cost of nuclear energy. The AP1000 design is based on the use of innovative passive technology and modular construction, which require significantly less equipment and commodities that facilitate a more rapid construction schedule. Because Westinghouse had the vision and the perseverance to continue the development of this passive technology, the AP1000 design is ready to meet today's challenge of near-term deployment

  12. License - TogoTV | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TogoTV License License to Use This Database Last updated : 2017/05/12 You may use this database...cense terms regarding the use of this database and the requirements you must follow in using this database. The license for this data...0 International . If you use data from this database, please be sure attribute this database as follows: Tog...on 4.0 International is found here . With regard to this database, you are licens...ed to: freely access part or whole of this database, and acquire data; freely redistribute part or whole of the data from this databa

  13. License - ConfC | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us ConfC License License to Use This Database Last updated : 2016/09/20 You may use this database...ense terms regarding the use of this database and the requirements you must follow in using this database. The license for this datab...re Alike 4.0 International . If you use data from this database, please be sure attribute this database as f... Commons Attribution-Share Alike 4.0 International is found here . With regard to this database, you are lic...ensed to: freely access part or whole of this database, and acquire data; freely redistribute part or whole of the data from this dat

  14. License - BodyParts3D | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us BodyParts3D License License to Use This Database Last updated : 2011/08/25 You may use this database...he license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributi...on-Share Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as foll...here . With regard to this database, you are licensed to: freely access part or whole of this database, and

  15. Safety and licensing issues for Indian PHWRs

    International Nuclear Information System (INIS)

    Srinivasan, G.R.; Das, M.

    1997-01-01

    India has achieved competency in design, construction, commissioning and operation of Pressurized Heavy Water Reactor based Nuclear Power Plants and has completed more than 120 reactor operating years with an extremely satisfactory safety record. In this paper, the safety management in NPCIL and operational safety aspects are discussed, licensing and regulatory approach is described and some of the main safety issues for Indian PHWRs are brought out. (author)

  16. Atomic Safety and Licensing Board Panel annual report, Fiscal year 1992

    International Nuclear Information System (INIS)

    1993-09-01

    In Fiscal Year 1992, the Atomic Safety and Licensing Board Panel (''the Panel'') handled 38 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license from the Nuclear Regulatory Commission. This reports sets out the Panel's caseload during the year and summarizes, highlights, and analyzes how the wide-ranging issues raised in those proceedings were addressed by the Panel's judges and licensing boards

  17. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Choi, C.H. . E-mail : chechee@khnp.co.kr

    2005-01-01

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  18. Near-term electric-vehicle program. Phase II. Mid-term review summary report

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-27

    The general objective of the Near-Term Electric Vehicle Program is to confirm that, in fact, the complete spectrum of requirements placed on the automobile (e.g., safety, producibility, utility, etc.) can still be satisfied if electric power train concepts are incorporated in lieu of contemporary power train concepts, and that the resultant set of vehicle characteristics are mutually compatible, technologically achievable, and economically achievable. The focus of the approach to meeting this general objective involves the design, development, and fabrication of complete electric vehicles incorporating, where necessary, extensive technological advancements. A mid-term summary is presented of Phase II which is a continuation of the preliminary design study conducted in Phase I of the program. Information is included on vehicle performance and performance simulation models; battery subsystems; control equipment; power systems; vehicle design and components for suspension, steering, and braking; scale model testing; structural analysis; and vehicle dynamics analysis. (LCL)

  19. Desert RATS 2011: Near-Earth Asteroid Human Exploration Operations

    Science.gov (United States)

    Abercromby, Andrew; Gernhardt, Michael L.; Chappel, Steve

    2012-01-01

    The Desert Research and Technology Studies (D-RATS) 2011 field test involved the planning and execution of a series of exploration scenarios under operational conditions similar to those that would be expected during a human exploration mission to a near-Earth asteroid (NEA). The focus was on understanding the operations tempo during simulated NEA exploration and the implications of communications latency and limited data bandwidth. Anchoring technologies and sampling techniques were not evaluated due to the immaturity of those technologies and the inability to meaningfully test them at D-RATS. Reduced gravity analogs and simulations are being used to fully evaluate Multi-Mission Space Exploration Vehicle (MMSEV) and extravehicular (EVA) operations and interactions in near-weightlessness at a NEA as part of NASA s integrated analogs program. Hypotheses were tested by planning and performing a series of 1-day simulated exploration excursions comparing test conditions all of which involved a single Deep Space Habitat (DSH) and either zero, one, or two MMSEVs; three or four crewmembers; one of two different communications bandwidths; and a 100-second roundtrip communications latency between the field site and Houston. Excursions were executed at the Black Point Lava Flow test site with a Mission Control Center and Science Support Room at Johnson Space Center (JSC) being operated with 100-second roundtrip communication latency to the field. Crews were composed of astronauts and professional field geologists and teams of Mission Operations, Science, and Education & Public Outreach (EPO) experts also supported the mission simulations each day. Data were collected separately from the Crew, Mission Operations, Science, and EPO teams to assess the test conditions from multiple perspectives. For the operations tested, data indicates practically significant benefits may be realized by including at least one MMSEV and by including 4 versus 3 crewmembers in the NEA exploration

  20. Licensing reform: a case study in public participation in the nuclear field

    International Nuclear Information System (INIS)

    Nordlinger, M.S.

    1993-01-01

    Political process and legal procedures join to accord the public a significant role in nuclear energy policy decision-making in the United States. We changed the two-stage license process in a combined license process with no separation between the construction and operating license, the policy statement requests public comment, allowing days for responses. It is a middle way between information and taking part in decision

  1. Study of a nuclear energy supplied steelmaking system for near-term application

    International Nuclear Information System (INIS)

    Yan, Xing L.; Kasahara, Seiji; Tachibana, Yukio; Kunitomi, Kazuhiko

    2012-01-01

    Conventional steelmaking processes involve intensive fossil fuel consumption and CO 2 emission. The system resulting from this study ties a steelmaking plant to a nuclear plant. The latter supplies the former all energy and feedstock with the exception of iron ore. The actual design takes on a multi-disciplinary approach: The nuclear plant employs a proven next-generation technology of fission reactor with 950 °C outlet temperature to produce electricity and heat. The plant construction saving and high efficiency keep the cogeneration cost down. The steelmaking plant employs conventional furnaces but substitutes hydrogen and oxygen for hydrocarbons as reactant and fuel. Water decomposition through an experimentally-demonstrated thermochemical process manufactures the feedstock gases required. Through essential safety features, particular a fully-passive nuclear safety, the design achieves physical proximity and yet operational independence of the two plants to facilitate inter-plant energy transmission. Calculated energy and material balance of the integrated system yields slightly over 1000 t steel per 1 MWt yr nuclear thermal energy. The steel cost is estimated competitive. The CO 2 emission amounts to 1% of conventional processes. The sustainable performance, economical potential, robust safety, and use of verified technological bases attract near-term deployment of this nuclear steelmaking system. -- Highlights: ► A steelmaking concept is proposed based on multi-disciplinary approach. ► It ties advanced nuclear fission reactor and energy conversion to thermochemical manufacture and direct iron making. ► Technological strength of each area is exploited to integrate a final process. ► Heat and material balance of the process is made to predict performance and cost. ► The system rules out fossil fuel use and CO 2 emission, and is near-term deployable.

  2. Introduction of long term cycle of reactor operation

    International Nuclear Information System (INIS)

    Aoyati, M.; Tanaka, T.

    2004-01-01

    Introduction of long term cycle of LWR reactor operation at NPP in Japan is considered, and problems of technical, legislative and economical character, increase of power coefficient are discussed. More long term operation period provides decreasing frequency of periodic inspections and reduction of personnel radiation doses. Reliability of fuel, energetic equipment, mechanisms and devices must be taken into account for the decision of technical problems. Consumptions for electric power generation are studied [ru

  3. "Near-term" Natural Catastrophe Risk Management and Risk Hedging in a Changing Climate

    Science.gov (United States)

    Michel, Gero; Tiampo, Kristy

    2014-05-01

    Competing with analytics - Can the insurance market take advantage of seasonal or "near-term" forecasting and temporal changes in risk? Natural perils (re)insurance has been based on models following climatology i.e. the long-term "historical" average. This is opposed to considering the "near-term" and forecasting hazard and risk for the seasons or years to come. Variability and short-term changes in risk are deemed abundant for almost all perils. In addition to hydrometeorological perils whose changes are vastly discussed, earthquake activity might also change over various time-scales affected by earlier local (or even global) events, regional changes in the distribution of stresses and strains and more. Only recently has insurance risk modeling of (stochastic) hurricane-years or extratropical-storm-years started considering our ability to forecast climate variability herewith taking advantage of apparent correlations between climate indicators and the activity of storm events. Once some of these "near-term measures" were in the market, rating agencies and regulators swiftly adopted these concepts demanding companies to deploy a selection of more conservative "time-dependent" models. This was despite the fact that the ultimate effect of some of these measures on insurance risk was not well understood. Apparent short-term success over the last years in near-term seasonal hurricane forecasting was brought to a halt in 2013 when these models failed to forecast the exceptional shortage of hurricanes herewith contradicting an active-year forecast. The focus of earthquake forecasting has in addition been mostly on high rather than low temporal and regional activity despite the fact that avoiding losses does not by itself create a product. This presentation sheds light on new risk management concepts for over-regional and global (re)insurance portfolios that take advantage of forecasting changes in risk. The presentation focuses on the "upside" and on new opportunities

  4. Making tradeoffs between the reasons to leave and reasons to stay employed in long-term care homes: perspectives of licensed nursing staff.

    Science.gov (United States)

    McGilton, Katherine S; Boscart, Veronique M; Brown, Maryanne; Bowers, Barbara

    2014-06-01

    Turnover of licensed nursing staff in long-term care (LTC) settings (e.g., nursing homes) is a mounting concern and is associated with poor quality of care and low staff morale. Retention and turnover research in LTC have focused primarily on direct care workers (i.e., nurse aides) leaving the issues largely unexplored for licensed nursing staff (i.e., registered nurses and licensed practical nurses). The main objective of this study was to understand factors that influence nurses' intentions to remain employed at their current job. Qualitative descriptive study. Seven nursing homes in Ontario, Canada. A convenience sample of forty-one licensed LTC nurses. Data were collected through focus groups conducted at each of the participating nursing homes. Focus group discussions were transcribed verbatim. Directed content analysis was used to identify and develop themes. Work conditions were a salient element affecting nurses' intention to stay and included impact of regulations on nurse role flexibility and professional judgment, an underfunded system contributing to insufficient resources and staffing, and a lack of supportive leadership. Factors promoting nurses' willingness to stay included the development of meaningful relationships with residents and staff and opportunities for learning and professional development. Nurses also considered personal and life circumstances (e.g., marital status and seniority) when discussing intention to stay. Nurses in this study weighed positive and negative work-related factors as well as personal circumstances to determine their intent to stay. Developing a more individualized approach to address attrition of licensed nurses in LTC may be the most successful strategy for improving retention of highly skilled staff in this sector. Copyright © 2013 Elsevier Ltd. All rights reserved.

  5. Importance of the licensing process on the safety culture in the Brazilian nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Motta, E.S.; Sousa, A.L.B. de; Paiva, R.L.C. de; Mezrahi, A.

    2013-01-01

    The main objective of the Nuclear Fuel Cycle Facilities licensing processes is to ensure the safety of these installations in their entire life cycle (in the installation site selection, designing, construction, pre-operational tests, operational and decommissioning phases). The Brazilian licensing process requires from the operator, among others, before the operating license: (I) a Site Report and a Final Safety Analysis Report, ensuring that all safety related issues are adequately analyzed and understood; (II) a formal structured Management System focused on the installation safety; and (III) dissemination of safety related information to all involved operator employees and subcontractors. Therefore, these requirements reflect in an adequate operator actions and practices, ensuring a working environment with a high level of safety culture. (author)

  6. Importance of the licensing process on the safety culture in the Brazilian nuclear fuel cycle facilities

    Energy Technology Data Exchange (ETDEWEB)

    Motta, E.S.; Sousa, A.L.B. de; Paiva, R.L.C. de; Mezrahi, A., E-mail: emotta@cnen.gov.br [Comissao Nacional de Energia Nuclear (CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2013-07-01

    The main objective of the Nuclear Fuel Cycle Facilities licensing processes is to ensure the safety of these installations in their entire life cycle (in the installation site selection, designing, construction, pre-operational tests, operational and decommissioning phases). The Brazilian licensing process requires from the operator, among others, before the operating license: (I) a Site Report and a Final Safety Analysis Report, ensuring that all safety related issues are adequately analyzed and understood; (II) a formal structured Management System focused on the installation safety; and (III) dissemination of safety related information to all involved operator employees and subcontractors. Therefore, these requirements reflect in an adequate operator actions and practices, ensuring a working environment with a high level of safety culture. (author)

  7. The role the safety analysis report and other documents in the licensing procedure in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Albrecht, E.; Ballhaus, S.

    1975-01-01

    Legal requirements for the licensing procedure, requirements for and preparation of licensing documents, authorities and experts participating in the licensing procedure, course of the atomic licensing procedure e.g. application for construction and operation, public hearing, site and concept license, partial licenses. (HP) [de

  8. Towards Harmonious Coexistence in the Unlicensed Spectrum: Rational Cooperation of Operators

    Directory of Open Access Journals (Sweden)

    Sunghwan Bae

    2017-10-01

    Full Text Available 5G New Radio (NR operating in the unlicensed spectrum is accelerating the Fourth Industrial Revolution by supporting Internet of Things (IoT networks or Industrial IoT deployments. Specifically, LTE-Advanced (LTE-A is looking to achieve spectrum integration through coexistence with multi-radio access technology (RAT systems in the same unlicensed bands with both licensed-assisted and stand-alone access. The listen-before-talk (LBT mechanism is mainly considered to enable an LTE operator to protect other incumbent unlicensed systems. In this article, we investigate the behaviors of multiple LTE operators along with the deployment of WiFi networks in the unlicensed spectrum from both short- and long-term points of view. In countries without mandatory LBT requirements, we show that an LTE operator is susceptible to collusion with another LTE operator, thus exploiting scarce spectrum resources by deceiving other wireless networks into thinking that channels are always busy; hence, mandatory usage of LTE with LBT is highly recommended at national level to achieve harmonious coexistence in the unlicensed spectrum. We discuss several possible coexistence scenarios to resolve the operator’s dilemmaas well as to improve unlicensed spectrum efficiency among multi-RAT systems, which is viable in the near future.

  9. License - D-HaploDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us D-HaploDB License License to Use This Database Last updated : 2011/08/25 You may use this database... license terms regarding the use of this database and the requirements you must follow in using this database...-Share Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as follow...ry of the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database..., you are licensed to: freely access part or whole of this database, and acquire dat

  10. License - SKIP Stemcell Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us SKIP Stemcell Database License License to Use This Database Last updated : 2017/03/13 You may use this database...specifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Common...s Attribution-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...al ... . The summary of the Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database

  11. License - RGP gmap2000 | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP gmap2000 License License to Use This Database Last updated : 2015/03/10 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as fo...y of the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database, yo

  12. License - RGP estmap2001 | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP estmap2001 License License to Use This Database Last updated : 2015/04/02 You may use this database...s the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attrib...ution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as ... the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database, you ar

  13. Sodium fast reactor safety and licensing research plan. Volume I.

    Energy Technology Data Exchange (ETDEWEB)

    Sofu, Tanju (Argonne National Laboratory, Argonne, IL); LaChance, Jeffrey L.; Bari, R. (Brokhaven National Laboratory Upton, NY); Wigeland, Roald (Idaho National Laboratory, Idaho Falls, ID); Denman, Matthew R.; Flanagan, George F. (Oak Ridge National Laboratory, Oak Ridge, TN)

    2012-05-01

    This report proposes potential research priorities for the Department of Energy (DOE) with the intent of improving the licensability of the Sodium Fast Reactor (SFR). In support of this project, five panels were tasked with identifying potential safety-related gaps in available information, data, and models needed to support the licensing of a SFR. The areas examined were sodium technology, accident sequences and initiators, source term characterization, codes and methods, and fuels and materials. It is the intent of this report to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for the SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the Applied Technology designation from old documents. The second cross-cutting gap is the need for a robust Knowledge Management and Preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with Applied Technology and Knowledge Management.

  14. Sodium fast reactor safety and licensing research plan - Volume I

    International Nuclear Information System (INIS)

    Sofu, Tanju; LaChance, Jeffrey L.; Bari, R.; Wigeland, Roald; Denman, Matthew R.; Flanagan, George F.

    2012-01-01

    This report proposes potential research priorities for the Department of Energy (DOE) with the intent of improving the licensability of the Sodium Fast Reactor (SFR). In support of this project, five panels were tasked with identifying potential safety-related gaps in available information, data, and models needed to support the licensing of a SFR. The areas examined were sodium technology, accident sequences and initiators, source term characterization, codes and methods, and fuels and materials. It is the intent of this report to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for the SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the Applied Technology designation from old documents. The second cross-cutting gap is the need for a robust Knowledge Management and Preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with Applied Technology and Knowledge Management.

  15. 77 FR 20353 - United States Warehouse Act; Export Food Aid Commodities Licensing Agreement

    Science.gov (United States)

    2012-04-04

    ... licensing agreement include, but are not limited to, corn soy blend, vegetable oil, and pulses such as peas, beans, and lentils. USWA licensing is a voluntary program. Warehouse operators that apply for USWA...

  16. 78 FR 34664 - Prospective Grant of Start-up Exclusive Evaluation License: Portable Device and Method for...

    Science.gov (United States)

    2013-06-10

    ...-up Exclusive Evaluation License: Portable Device and Method for Detecting Hematomas AGENCY: National... hematomas. Upon the expiration or termination of the start-up exclusive evaluation license, ArcheOptix will... device and method for detecting hematomas based on near infrared light emitted perpendicularly into a...

  17. Safety Evaluation Report related to renewal of the operating license for the CAVALIER Training Reactor at the University of Virginia (Docket No. 50-396)

    International Nuclear Information System (INIS)

    1985-05-01

    This Safety Evaluation Report for the application filed by the University of Virginia for a renewal of Operating License R-123 to continue to operate the CAVALIER (Cooperatively Assembled Virginia Low Intensity Educational Reactor) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the University of Virginia and is located on the campus in Charlottesville, Virginia. Based on its technical review, the staff concludes that the reactor facility can continue to be operated by the university without endangering the health and safety of the public or the environment

  18. Safety evaluation report related to the renewal of the operating license for the Worcester Polytechnic Institute open-pool training reactor, Docket No. 50-134

    International Nuclear Information System (INIS)

    1982-12-01

    This Safety Evaluation Report for the application filed by the Worcester Polytechnic Institute (WPI) for a renewal of Operating License R-61 to continue to operate the WPI 10-kW open-pool training reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the Worcester Polytechnic Institute and is located on the WPI campus in Worcester, Worcester County, Massachusetts. The staff concludes that the reactor facility can continue to be operated by WPI without endangering the health and safety of the public

  19. Safety Evaluation Report related to the renewal of the operating license for the research reactor at the University of Kansas (Docket No. 50-148)

    International Nuclear Information System (INIS)

    1984-05-01

    This Safety Evaluation Report for the application filed by the University of Kansas (KU) for a renewal of Operating License R-78 to continue to operate the KU 250-kW open-pool training reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the University of Kansas and is located on the KU campus in Lawrence, Douglas County, Kansas. The staff concludes that the reactor facility can continue to be operated by KU without endangering the health and safety of the public. 17 references, 11 figures, 4 tables

  20. Safety Evaluation Report, related to the renewal of the operating license for the critical experiment facility of the Rensselaer Polytechnic Institute (Docket No. 50-225)

    International Nuclear Information System (INIS)

    1983-10-01

    This Safety Evaluation Report for the application filed by the Rensselaer Polytechnic Institute (RPI) for a renewal of operating license CX-22 to continue to operate a critical experiment facility has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by Rensselaer Polytechnic Institute and is located at a site in the city of Schenectady, New York. The staff concludes that this critical facility can continue to be operated by RPI without endangering the health and safety of the public

  1. Licensing authority's control of radiation sources and nuclear materials in Brazil

    International Nuclear Information System (INIS)

    Binns, D.A.C.

    2002-01-01

    Full text: The Brazilian Nuclear Energy Commission is the national licensing authority and among its responsibilities is the control of nuclear materials and radiation sources. This control is carried out in three different ways: 1) Control of the import and export of nuclear materials and radiation sources. To be able to import or export any nuclear material or radiation source, the user has to have an explicit permission of the licensing authority. This is controlled by electronic means in which the user has to fill a special form found on the licensing authority's home page, where he has to fill in his name, license number, license number of his radiation protection officer and data of the material to be imported or exported. These data are checked with a data base that contains all the information of the licensed users and qualified personnel before authorization is emitted. The airport authorities have already installed x-ray machines to check all baggages entering or leaving the country. 2) Transport and transfer permit for radiation sources. In order to transport and/or transfer radiations sources and nuclear materials within the country, the user(s) have to submit an application to the licensing authority. The user(s) fill out an application form where he fills in his company's name, licensing I.D., radiation protection officer's name and I.D and identification of the sources involved. These information are checked with the licensing operations data before the operations is permitted. 3) Inspections and radiation monitoring systems. Routine and regulatory inspections are continuously carried out where the user's radiation sources and nuclear materials inventory are checked. Also the physical security and protection of these materials are verified. The installation of monitoring systems is an item that is being discussed with the airport authorities so as to increase the possibilities of detecting any illegal transport of these materials. (author)

  2. 10 CFR 50.43 - Additional standards and provisions affecting class 103 licenses and certifications for...

    Science.gov (United States)

    2010-01-01

    ..., paragraphs (a) through (e) of this section apply in the case of a class 103 license for a facility for the... electric energy, if otherwise qualified, from obtaining a construction permit or operating license under... over a sufficient range of normal operating conditions, transient conditions, and specified accident...

  3. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... request a replacement. The application must be accompanied by the required fee and submitted to the...

  4. The current role of simulators for performance evaluations and licensing (case of Mexico)

    International Nuclear Information System (INIS)

    Maldonado A, H.

    1997-01-01

    The main purpose of this paper is to share the experience acquired by the National Commission of Nuclear Safety and Safeguards (CNSNS) during the administration of both certification and licensing operational exams applied to Senior Reactor Operators (SRO) and Reactor OPerators (RO) by using a full-scope simulator. The licensing operational exams are administered to examinate candidates for a SRO or RO license while the certification operational exams are administered to all personnel that possess a SRO or RO license in order to renew their licenses within a six years period. A general description with the most important simulator antecedents from the initial authorization for its usage to provide the ''Initial Simulator Training Course'' until currently in which it has been started the installation and testing performance of a new computer equipment that will improve and increase the simulation capacity of the Laguna Verde Nuclear Power Plant (LVNPP) simulator. In other hand, it is showed the process that the CNSNS will apply during the next verification of the simulator certification which should be performed due to the old computer equipment is being replaced with a more modern computer equipment so that the simulation capability will be improved. The verification process was discussed with the utility personnel and as result of this an agreement has been established to carry into effect this hard task. Finally, the conclusions and recommendations from regulators point of view are presented regarding to the importance of perform a well both evaluation and verification of simulators performance. (author)

  5. 31 CFR 594.307 - Licenses; general and specific.

    Science.gov (United States)

    2010-07-01

    ...) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY GLOBAL TERRORISM SANCTIONS REGULATIONS General Definitions § 594.307 Licenses; general and specific. (a) Except as otherwise specified, the term...

  6. Practical methods for near-term piloted Mars missions

    Science.gov (United States)

    Zubrin, Robert M.; Weaver, David B.

    1993-01-01

    An evaluation is made of ways of using near-term technologies for direct and semidirect manned Mars missions. A notable feature of the present schemes is the in situ propellant production of CH4/O2 and H2O on the Martian surface in order to reduce surface consumable and return propellant requirements. Medium-energy conjunction class trajectories are shown to be optimal for such missions. Attention is given to the backup plans and abort philosophy of these missions. Either the Russian Energia B or U.S. Saturn VII launch vehicles may be used.

  7. License application approach for the California LLRW disposal facility

    International Nuclear Information System (INIS)

    Gaynor, R.K.; Romano, S.A.; Hanrahan, T.P.

    1990-01-01

    US Ecology, Inc. is the State of California's license designee to site, develop and operate a low-level radioactive waste (LLRW) disposal facility to serve member states of the Southwestern Compact. US Ecology identified a proposed site in the Ward Valley of southeastern California in March 1988. Following proposed site selection, US Ecology undertook studies required to prepare a license application. US Ecology's license application for this desert site was deemed complete for detailed regulatory review by the California Department of Health Services (DHS) in December 1989. By mutual agreement, disposal of mixed waste is not proposed pending the State of California's decision on appropriate management of this small LLRW subset

  8. Antimatter Requirements and Energy Costs for Near-Term Propulsion Applications

    Science.gov (United States)

    Schmidt, G. R.; Gerrish, H. P.; Martin, J. J.; Smith, G. A.; Meyer, K. J.

    1999-01-01

    The superior energy density of antimatter annihilation has often been pointed to as the ultimate source of energy for propulsion. However, the limited capacity and very low efficiency of present-day antiproton production methods suggest that antimatter may be too costly to consider for near-term propulsion applications. We address this issue by assessing the antimatter requirements for six different types of propulsion concepts, including two in which antiprotons are used to drive energy release from combined fission/fusion. These requirements are compared against the capacity of both the current antimatter production infrastructure and the improved capabilities that could exist within the early part of next century. Results show that although it may be impractical to consider systems that rely on antimatter as the sole source of propulsive energy, the requirements for propulsion based on antimatter-assisted fission/fusion do fall within projected near-term production capabilities. In fact, a new facility designed solely for antiproton production but based on existing technology could feasibly support interstellar precursor missions and omniplanetary spaceflight with antimatter costs ranging up to $6.4 million per mission.

  9. Compliance with driver's license laws and illegal licensing among commercial bus drivers in Lagos, Nigeria: policy implications and evidence for action.

    Science.gov (United States)

    Okafor, I P; Odeyemi, K A; Dolapo, D C; Adegbola, A A

    2014-09-01

    To determine the level of compliance with driver's license laws among commercial bus drivers in Lagos, Nigeria. Two intercity motor parks were selected by simple random sampling and all consenting minibus drivers participated in the study. Key Informant Interviews (KIIs) were also conducted with selected officials in the driver training and licensing authorities. Compliance with the minimum age for driving was high (93.6%), so also was having driving test prior to driver's license procurement (83.3%). Formal driver training and VA testing were very low, (26.1% and 32.9% respectively) Overall, only 9.3% of them were found to have fulfilled all the pre-license obligations before obtaining their first driver's license. The odds of a driver with a secondary education having formal driver training is 3.33 times higher than those with no education (OR 3.33, 95% CI 1.01-11.35). Drivers who were 60 years or older were 3.62 times more likely to be compliant than those who were between 20-29 years (OR 3.62, 95% CI 0.56-29.19). For the 98.3% of them who possessed valid licenses, 52.3% of them obtained them illegally. All the key officials saw RTIs as a serious public health problem but faced several challenges in the course of their work. Overall compliance with pre-license regulations was very poor. There is need for a review and strict enforcement of driver's license laws to improve compliance. Also vital are fostering inter-sectoral collaboration and improvement in the operations of all establishments involved in driver training and license procurement in Nigeria.

  10. Comparative Analysis of Hydraulic Fracturing Wastewater Practices in Unconventional Shale Development: Newspaper Coverage of Stakeholder Concerns and Social License to Operate

    OpenAIRE

    Joel Gehman; Dara Y. Thompson; Daniel S. Alessi; Diana M. Allen; Greg G. Goss

    2016-01-01

    In this article we review prior literature regarding the concept of social license to operate, and related concepts, including corporate social responsibility, sustainable development, stakeholder management and cumulative effects. Informed by these concepts, we search for newspaper articles published in North American provinces and states where the Barnett, Duvernay, Marcellus and Montney shale plays are located. Using these data, we tabulate coverage of stakeholder concerns related to hydra...

  11. Almost conserved operators in nearly many-body localized systems

    Science.gov (United States)

    Pancotti, Nicola; Knap, Michael; Huse, David A.; Cirac, J. Ignacio; Bañuls, Mari Carmen

    2018-03-01

    We construct almost conserved local operators, that possess a minimal commutator with the Hamiltonian of the system, near the many-body localization transition of a one-dimensional disordered spin chain. We collect statistics of these slow operators for different support sizes and disorder strengths, both using exact diagonalization and tensor networks. Our results show that the scaling of the average of the smallest commutators with the support size is sensitive to Griffiths effects in the thermal phase and the onset of many-body localization. Furthermore, we demonstrate that the probability distributions of the commutators can be analyzed using extreme value theory and that their tails reveal the difference between diffusive and subdiffusive dynamics in the thermal phase.

  12. License - The Rice Growth Monitoring for The Phenotypic Functional Analysis | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available s Database Last updated : 2011/11/08 You may use this database in compliance with the terms and conditions o...f the license described below. The license specifies the license terms regarding the use of this database an...d the requirements you must follow in using this database. The license for this database... is specified in the Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database..., please be sure attribute this database as follows: The Rice Growth Monitoring for the Phenotypic Fu

  13. Space reactor/organic Rankine conversion - A near-term state-of-the-art solution

    Science.gov (United States)

    Niggemann, R. E.; Lacey, D.

    The use of demonstrated reactor technology with organic Rankine cycle (ORC) power conversion can provide a low cost, minimal risk approach to reactor-powered electrical generation systems in the near term. Several reactor technologies, including zirconium hydride, EBR-II and LMFBR, have demonstrated long life and suitability for space application at the operating temperature required by an efficient ORC engine. While this approach would not replace the high temperature space reactor systems presently under development, it could be available in a nearer time frame at a low and predictable cost, allowing some missions requiring high power levels to be flown prior to the availability of advanced systems with lower specific mass. Although this system has relatively high efficiency, the heat rejection temperature is low, requiring a large radiator on the order of 3.4 sq m/kWe. Therefore, a deployable heat pipe radiator configuration will be required.

  14. Phase 1 immobilized low-activity waste operational source term

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    This report presents an engineering analysis of the Phase 1 privatization feeds to establish an operational source term for storage and disposal of immobilized low-activity waste packages at the Hanford Site. The source term information is needed to establish a preliminary estimate of the numbers of remote-handled and contact-handled waste packages. A discussion of the uncertainties and their impact on the source term and waste package distribution is also presented. It should be noted that this study is concerned with operational impacts only. Source terms used for accident scenarios would differ due to alpha and beta radiation which were not significant in this study

  15. Safety Evaluation Report related to the construction permit and operating license for the research reactor at the University of Texas (Docket No. 50-602)

    International Nuclear Information System (INIS)

    1985-05-01

    This Safety Evaluation Report for the application filed by the University of Texas for a construction permit and operating license to construct and operate a TRIGA research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the University of Texas and is located at the university's Balcones Research Center, about 7 miles (11.6 km) north of the main campus in Austin, Texas. The staff concludes that the TRIGA reactor facility can be constructed and operated by the University of Texas without endangering the health and safety of the public

  16. Management of the licensing of users of radioactive materials should be improved

    International Nuclear Information System (INIS)

    1976-01-01

    Radioactive material licenses are required for manufacturing nuclear fuel for reactors and for industrial, commercial, medical, and educational uses of radioactive materials. This type of license is not for constructing or operating nuclear power reactors and facilities for processing used nuclear fuels. This report discusses the need for better management improvements in the NRC's program for licensing the users. As of December 31, 1974, there were 8,253 active NRC-issued material licenses held by 6,310 licensees. The study reviewed NRC's policies, procedures, and practices, and examined recent evaluations of state programs to identify problems encountered by the states

  17. Role of check operators in achieving operational excellence at Virginia Power's nuclear stations

    International Nuclear Information System (INIS)

    Shriver, B.L.; Williams, T.M.; Stewart, W.L.

    1987-01-01

    Virginia Power has implemented a Check Operator Program as a part of its commitment to excellence in the operation of the North Anna and Surry nuclear power stations. The Check Operator Program utilizes highly qualified licensed personnel to independently evaluate the performance of licensed operators and senior operators during normal, abnormal and simulated emergency conditions. Emphasis is placed upon individual and team performance as well as the procedures and training which support the operators. The check operators report to line management to ensure that their recommendations are implemented into the overall operations philosophy of the power station

  18. Managing aging effects on dry cask storage systems for extended long-term storage and transportation of used fuel - rev. 0

    Energy Technology Data Exchange (ETDEWEB)

    Chopra, O.K.; Diercks, D.; Fabian, R.; Ma, D.; Shah, V.; Tam, S.W.; Liu, Y. (Decision and Information Sciences); ( EVS); ( NE)

    2012-07-06

    The cancellation of the Yucca Mountain repository program in the United States raises the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Application for ISFSI license renewals must include the following: (1) Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation; and (2) a description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must also include design bases information as documented in the most recent updated final safety analysis report as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference provided that those references are clear and specific. The NRC has recently issued the Standard Review Plan (SRP) for renewal of used-fuel dry cask storage system (DCSS) licenses and Certificates of Compliance (CoCs), NUREG-1927, under which NRC may renew a specific license or a CoC for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and DCSS that address aging effects that

  19. 77 FR 2057 - Aquamac Corporation; Notice of Termination of License by Implied Surrender and Soliciting...

    Science.gov (United States)

    2012-01-13

    ... Corporation; Notice of Termination of License by Implied Surrender and Soliciting Comments and Motions To.... Type of Proceeding: Termination of License by Implied Surrender. b. Project No.: 2927-006. c. Date... authorized, the licensee is in violation of the terms and conditions of the license. l. This notice is...

  20. Challenges in long-term operation of nuclear power plants - Implications for regulatory bodies

    International Nuclear Information System (INIS)

    Soda, Kunihisa; Van Wonterghem, Frederik; Khouaja, Hatem; Vilpas, Martti; Osouf, Nicolas; Harikumar, S.; Ishigaki, Hiroki; Osaki, Toru; Yamada, Tomoho; Carlsson, Lennart; Shepherd, David; Galloway, Melanie; Liszka, Ervin; Svab, Miroslav; Pereira, Ken; Huerta, Alejandro

    2012-01-01

    Nuclear power reactors have become a major source of electricity supply in many countries in the past half a century. Based on this experience, many operators have sought and have received authorisation for long-term operation, whereby plant operation continues beyond the period considered in the design of the plant. Acceptance of a nuclear power plant for extended service should be based on assurance of the fitness of the plant and the operator for safe and reliable operation over the entire period considered for long-term operation. This assurance may be obtained by establishment of appropriate regulatory requirements, specification of goals and safety levels and regulatory assessment and oversight of the operator's programme for long-term operation. The operators and regulators should ensure that operating experience continues to be evaluated during long-term operation to ensure that any relevant lessons are effectively applied. Other considerations for assurance of safe operation are effective management of ageing, possible need for safety improvements, application of lessons learnt from operating experience, evaluation of environmental impacts, adequate staff resources and performance, review of security at the plant, action in response to emerging issues, and openness and transparency in the transition to long-term operation. Even though most of these considerations are addressed under the regulatory framework that applies to the initial operating period, additional regulatory activities in these areas may be necessary for long-term operation. Although there can be significant differences in regulatory approaches used by different countries for evaluating acceptability of long-term operation, there is general agreement on the purposes and goals of the regulatory reviews. An authorisation of long-term operation could involve a licence renewal or a periodic safety review or an approach that melds elements of both. This report presents guidance that is intended