WorldWideScience

Sample records for nasa awards contract

  1. The advantages of cost plus award fee contracts

    Science.gov (United States)

    Keathley, William C.

    1994-01-01

    A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

  2. 23 CFR 635.114 - Award of contract and concurrence in award.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.114 Award of contract and concurrence in award. (a) Federal-aid contracts shall be awarded only on the basis of the lowest responsive... 23 Highways 1 2010-04-01 2010-04-01 false Award of contract and concurrence in award. 635.114...

  3. 48 CFR 1316.405-2 - Cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-plus-award-fee... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1316.405-2 Cost-plus-award-fee contracts. Insert clause 1352.216-72, Determination of Award Fee, in all cost-plus-award-fee contracts. ...

  4. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  5. Audit of Cost-Plus-Award-Fee Contracts

    National Research Council Canada - National Science Library

    Granetto, Paul

    1995-01-01

    The audit objectives were to determine whether award fees contain adequate incentive amounts for contractors to reduce costs and whether the DoD contracting officers were effectively using cost-plus-award-fee contracts...

  6. 13 CFR 305.11 - Contract awards; early construction start.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Contract awards; early construction start. 305.11 Section 305.11 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... § 305.11 Contract awards; early construction start. EDA must determine that the award of all contracts...

  7. 48 CFR 216.405-2 - Cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-award-fee... Contracts 216.405-2 Cost-plus-award-fee contracts. (b) Application. The cost-plus-award-fee (CPAF) contract... avoid— (1) Establishing cost-plus-fixed-fee contracts when the criteria for cost-plus-fixed-fee...

  8. 48 CFR 16.305 - Cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 16.305 Cost-plus-award... consisting of (a) a base amount (which may be zero) fixed at inception of the contract and (b) an award amount, based upon a judgmental evaluation by the Government, sufficient to provide motivation for...

  9. 48 CFR 53.301-26 - Award/Contract.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Award/Contract. 53.301-26 Section 53.301-26 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-26 Award/Contract. ER22AP08.000 [73 FR 21785, Apr...

  10. 48 CFR 1516.405-2 - Cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Cost-plus-award-fee... AGENCY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1516.405-2 Cost-plus-award-fee contracts. ...

  11. 48 CFR 1552.217-72 - Option to extend the term of the contract-cost-plus-award-fee contract.

    Science.gov (United States)

    2010-10-01

    ... of the contract-cost-plus-award-fee contract. 1552.217-72 Section 1552.217-72 Federal Acquisition...-award-fee contract. As prescribed in 1517.208(c), insert this contract clause in cost-plus-award-fee... Term of the Contract—Cost-Plus-Award-Fee Contract (APR 1984) (a) The Government has the option to...

  12. 48 CFR 416.405-2 - Cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Cost-plus-award-fee... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 416.405-2 Cost-plus-award-fee contracts. The HCA may designate an acquisition official other than the contracting officer as the fee...

  13. Award-term contracts: Good for business?

    OpenAIRE

    Stevens, Brett; Yoder, E. Cory

    2005-01-01

    The use of award-term contracts doesn’t seem to represent the best interests of the U.S. taxpayer—rather, it smacks terribly of the government acquisition environment of two decades ago that pre- ceded the passage of the Competition in Contracting Act.

  14. 10 CFR 603.1000 - Contracting officer's responsibilities at time of award.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Contracting officer's responsibilities at time of award. 603.1000 Section 603.1000 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Executing the Award § 603.1000 Contracting officer's responsibilities at time of award...

  15. Ferox is awarded another contract by CERN

    CERN Multimedia

    2002-01-01

    Ferox, manufacturer of equipment for the chemical industry, has been awarded a second contract by the physical research centre CERN (Switzerland). The contract regards the delivery of 10 pcs of stainless containers for liquid nitrogen and argon with a capacity of 50 cu mt (1 paragraph).

  16. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... cost-plus-award-fee contracts. 915.404-4-72 Section 915.404-4-72 Federal Acquisition Regulations System....404-4-72 Special considerations for cost-plus-award-fee contracts. (a) When a contract is to be awarded on a cost-plus-award-fee basis several special considerations are appropriate. Fee objectives for...

  17. 48 CFR 1552.217-74 - Option for increased quantity-cost-plus-award-fee contract.

    Science.gov (United States)

    2010-10-01

    ... quantity-cost-plus-award-fee contract. 1552.217-74 Section 1552.217-74 Federal Acquisition Regulations... Texts of Provisions and Clauses 1552.217-74 Option for increased quantity—cost-plus-award-fee contract. As prescribed in 1517.208(e), insert this contract clause in cost-plus-award-fee term contracts when...

  18. 29 CFR 4.146 - Contract obligations after award, generally.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Contract obligations after award, generally. 4.146 Section 4.146 Labor Office of the Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Period of Coverage § 4.146 Contract obligations after...

  19. 48 CFR 215.404-74 - Fee requirements for cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Fee requirements for cost... NEGOTIATION Contract Pricing 215.404-74 Fee requirements for cost-plus-award-fee contracts. In developing a fee objective for cost-plus-award-fee contracts, the contracting officer shall— (a) Follow the...

  20. 48 CFR 3009.171-3 - Determination of eligibility for award of FPS guard service contracts.

    Science.gov (United States)

    2010-10-01

    ... eligibility for award of FPS guard service contracts. 3009.171-3 Section 3009.171-3 Federal Acquisition... eligibility for award of FPS guard service contracts. (a) Contracting officers shall make a determination of eligibility for award of FPS guard service contracts upon identification of the apparent successful offeror as...

  1. 48 CFR 1816.405-2 - Cost-plus-award-fee (CPAF) contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Cost-plus-award-fee (CPAF) contracts. 1816.405-2 Section 1816.405-2 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....405-2 Cost-plus-award-fee (CPAF) contracts. [62 FR 3478, Jan. 23, 1997. Redesignated at 62 FR 36706...

  2. 48 CFR 916.405-2 - Cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ..., output, be it hardware, research and development, demonstration or services, together with business... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 916.405-2 Cost-plus-award-fee... appropriate) and business management considerations tailored to the needs of the particular situation. In...

  3. 48 CFR 16.405-2 - Cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 16.405-2 Cost-plus-award-fee... during performance and that is sufficient to provide motivation for excellence in the areas of cost... consisting of (1) a base amount fixed at inception of the contract, if applicable and at the discretion of...

  4. 48 CFR 1852.216-76 - Award Fee for service contracts.

    Science.gov (United States)

    2010-10-01

    ... payments exceed the final evaluation score, the Contractor will either credit the next payment voucher for... [insert payment office] will make payment based on [Insert method of authorizing award fee payment, e.g... fee has been paid, the Contracting Officer may direct the withholding of further payment of award fee...

  5. 24 CFR 891.535 - Requirements for awarding construction contracts.

    Science.gov (United States)

    2010-04-01

    ... method of contract award under paragraph (c) of this section. In competitive bidding, sealed bids are... acceptance of such bid within a specified period after the opening, execute and deliver a contract in the... file) and that the bid is signed by a person authorized to bind the bidder. (4) Bidding shall be open...

  6. 48 CFR 1552.214-71 - Contract award-other factors-formal advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract award-other factors-formal advertising. 1552.214-71 Section 1552.214-71 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 1552.214-71 Contract...

  7. 46 CFR Sec. 4 - Persons authorized to make awards under the NSA-WORKSMALREP Contract.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Persons authorized to make awards under the NSA-WORKSMALREP Contract. Sec. 4 Section 4 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION A... INDIVIDUAL CONTRACT FOR MINOR REPAIRS-NSA-WORKSMALREP Sec. 4 Persons authorized to make awards under the NSA...

  8. 48 CFR 1836.570 - NASA solicitation provisions and contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA solicitation provisions and contract clause. 1836.570 Section 1836.570 Federal Acquisition Regulations System NATIONAL... CONTRACTS Contract Clauses 1836.570 NASA solicitation provisions and contract clause. (a) The contracting...

  9. 48 CFR 1852.216-77 - Award fee for end item contracts.

    Science.gov (United States)

    2010-10-01

    ... either credit the next payment voucher for the amount of such overpayment or refund the difference to the... Contracting Officer. (2) Interim award fee payments will be made to the Contractor based on each interim evaluation. The amount of the interim award fee payment is limited to the lesser of the interim evaluation...

  10. 48 CFR 1835.070 - NASA contract clauses and solicitation provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA contract clauses and....070 NASA contract clauses and solicitation provision. (a) The contracting officer shall insert the... ensure that the provision at 1852.235-72, Instructions for Responding to NASA Research Announcements, is...

  11. 36 CFR 51.25 - Are there any other circumstances in which the Director may award a concession contract without...

    Science.gov (United States)

    2010-07-01

    ... circumstances. The Director must publish a notice of his intention to award a concession contract to a specified... circumstances in which the Director may award a concession contract without public solicitation? 51.25 Section... in which the Director may award a concession contract without public solicitation? Notwithstanding...

  12. 75 FR 35089 - Notice of Availability of the Record of Decision for Proposed Contract Award to House District of...

    Science.gov (United States)

    2010-06-21

    ... for Proposed Contract Award to House District of Columbia-Sentenced Felons and Criminal Aliens Within... proposed award of a contract to house approximately 1,380 federal, low-security, adult male District of... award of a contract to house approximately 1,380 federal, low-security, adult male DC-sentenced felons...

  13. 76 FR 57014 - Award Fee for Service and End-Item Contracts

    Science.gov (United States)

    2011-09-15

    ... next payment voucher for the amount of such overpayment or refund the difference to the Government, as... evaluation score, the Contractor will either credit the next payment voucher for the amount of such... the Award Fee for Service Contracts clause to allow the contracting officer to withhold fee payments...

  14. Award of Public Contracts as a Means to Conferring State Aid

    DEFF Research Database (Denmark)

    Fanøe Petersen, Cecilie

    The Thesis investigates the interface between State aid law and public procurement law with an emphasis on analysing when the award of public contracts by contracting authorities constitutes State aid within the meaning of Article 107(1) TFEU. Article 107(1) TFEU prohibits any aid granted by a Me...

  15. LEGAL PROTECTION IN AWARDING PUBLIC CONTRACTS PROCEEDINGS- HARMONISATION OF CROATIAN LAW WITH THE ACQUIS COMMUNAUTAIRE

    Directory of Open Access Journals (Sweden)

    Damir Aviani

    2008-01-01

    Full Text Available Every economic activity of public legal bodies, and similarly with the activities of public-legal bodies in awarding public contracts to business partners, is subject to the rules of market competition. In order to secure free market competition, and market oriented activity of public legal bodies, the European Union, with its rules, limits the activity of public power and forces it to act in a market oriented way in its economic activities. The legal inheritance of the Union which is related to the awarding of public contracts (on public procurement, concessions and public-private partnership is based on general principles which arise from the Agreement on the Establishment of the European Union, and from the court practice of the European Court of Justice such as transparency, equal treatment and non-discrimination. The demands which are placed on legal protection within the area of awarding certain public contracts are regulated by two, in important points confl ictive directives of the EU on legal remedies: Directive 89/665/EEC, which is related to legal protection in the so called classic sector and by Directive 92/13/EEC which is related to the legal protection in the services sector. The aforementioned with directives set certain demands which the member states must satisfy during the regulation of legal protection in their national legislative. The Croatian system of legal remedies is not unique in the questions of legal protection in procedures of awarding public contracts. That is, the system of legal protection in the procedure of public procurement is different from legal protection in the procedure of awarding contracts of concession and contracts of public-private partnership. Court control of public administration is recognisable as the fundamental element of the rule of law. However, there exists signifi cant room for improvement of legal, and in particular, court protection in the Republic of Croatia for breach of law during

  16. 20 CFR 670.320 - What are the requirements for award of contracts and payments to Federal agencies?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What are the requirements for award of contracts and payments to Federal agencies? 670.320 Section 670.320 Employees' Benefits EMPLOYMENT AND... Funding and Selection of Service Providers § 670.320 What are the requirements for award of contracts and...

  17. NASA Excellence Award for Quality and Productivity 1989 highlights. The 1989 recipient: Lockheed Engineering and Sciences Company

    Science.gov (United States)

    1990-01-01

    The NASA Excellence Award for Productivity and Quality is the result of NASA's desire to encourage superior quality and the continuous improvement philosophy in the aerospace industry. It is awarded to NASA contractors, subcontractors, and suppliers who have demonstrated sustained excellence, customer orientation, and outstanding achievements in a total quality management (TQM) environment. The 'highlights' booklet is intended to transfer successful techniques demonstrated by the performance and quality of major NASA contractors.

  18. 48 CFR 3009.171-7 - Contract award approval procedures for contractors with felony convictions.

    Science.gov (United States)

    2010-10-01

    ... felony no longer calls into question the individual or business concern's integrity or business ethics... individual or business concern's integrity or business ethics and that an award would be consistent with the... request to permit award of a contract for FPS guard services to a business concern owned, controlled, or...

  19. Novel procurement concepts utilized to award contract for vitrification of an F006 mixed waste sludge

    International Nuclear Information System (INIS)

    Pickett, J.B.; Musall, J.C.; Hayes, A.F.; Campbell, E.E.

    1994-01-01

    A number of novel concepts were utilized in a procurement bid process to award a contract for the stabilization of a mixed wastewater treatment plating line sludge from the Reactor Materials department (M-Area) at the Savannah River site (SRS). The contract award was based on a combination of technical and cost considerations. The technical aspects included an evaluation of the technical validity of the proposed process(es) (i.e., would the process work?), the physical resources of the proposer and the expertise of the personnel proposed to work on the program, and prior experience of the firm wit treatment and stabilization of mixed (radioactive and hazardous) wastes. This paper will concentrate on the cost and the bid award considerations, rather than the technical aspects

  20. An optimization modeling approach to awarding large fire support wildfire helicopter contracts from the US Forest Service

    Science.gov (United States)

    Stephanie A. Snyder; Keith D. Stockmann; Gaylord E. Morris

    2012-01-01

    The US Forest Service used contracted helicopter services as part of its wildfire suppression strategy. An optimization decision-modeling system was developed to assist in the contract selection process. Three contract award selection criteria were considered: cost per pound of delivered water, total contract cost, and quality ratings of the aircraft and vendors....

  1. NASA Small Business Innovation Research Program. Composite List of Projects, 1983 to 1989

    Science.gov (United States)

    1990-01-01

    The NASA SBIR Composite List of Projects, 1983 to 1989, includes all projects that have been selected for support by the Small Business Innovation Research (SBIR) Program of NASA. The list describes 1232 Phase 1 and 510 Phase 2 contracts that had been awarded or were in negotiation for award in August 1990. The main body is organized alphabetically by name of the small businesses. Four indexes cross-reference the list. The objective of this listing is to provide information about the SBIR program to anyone concerned with NASA research and development activities.

  2. 36 CFR 51.24 - May the Director award a temporary concession contract without a public solicitation?

    Science.gov (United States)

    2010-07-01

    ... visitor services. Further, the Director must publish notice in the Federal Register of the proposed... infeasible. The Director must publish a notice of his intention to award a temporary concession contract to a... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false May the Director award a...

  3. The Impact of the Choice of Evaluation Criteria and the Type of Tender on the Awarding Public Contracts (in the Case of Construction Contracts at the Local Level in the Czech Republic

    Directory of Open Access Journals (Sweden)

    František Ochrana

    2015-01-01

    Full Text Available Public procurement may be examined from different perspectives. Using the Czech Republic as an example, this study is devoted to examining the impact of decisions made by the contracting authority regarding a public tender on the tender process itself and on the outcomes of the tender. The contracting authority addresses a number of decision-making issues regarding public procurements. For example, it needs to decide between two types of criteria (choosing between a single-criterion evaluation or rather opting for several evaluation criteria. At the same time, the authority is free to choose among different types of award procedures while adhering to certain restrictions imposed by the Act on Public Contracts. Using a sample of 1,027 construction work contracts awarded in the Czech Republic, the study examines, in more detail, the impacts of individual choices made by the contracting authority (namely the type of evaluation criteria chosen and the type of procedure for awarding contracts on the estimated and final price of public contracts. Recommendations on how to streamline the process of public procurement can be drawn from conclusions from the empirical analysis.

  4. Award of Construction Contracts: Public Institutions' Authority to Select the Lowest Responsible Bidder.

    Science.gov (United States)

    Cole, Elsa Kircher; Goldblatt, Steven M.

    1989-01-01

    The article describes the responsibilities of public colleges and universities to award construction contracts to the lowest responsible bidder; discusses the purpose of bid statutes; and lists the factors institutions should consider in determining a bidder's responsibility. Also covered are the standard of review and due process rights of the…

  5. 76 FR 8303 - Defense Federal Acquisition Regulation Supplement; Award-Fee Contracts (DFARS Case 2006-D021)

    Science.gov (United States)

    2011-02-14

    ... event a contractor fails to meet contractual obligations. Assuming the contract is properly structured... meet contractual performance requirements will maximize the amount of award fee earned, there is no...

  6. Proposal for the award of an industrial support contract for indoor fitting work at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for indoor fitting work (carpentry, glazing, venetian and roller blinds) at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm ROLAND COSTA MENUISERIE (CH), the lowest bidder, for the provision of indoor fitting work at CERN, for three years for a total amount not exceeding 1 213 403 Swiss francs, not subject to revision for two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  7. Flight Control Laws for NASA's Hyper-X Research Vehicle

    Science.gov (United States)

    Davidson, J.; Lallman, F.; McMinn, J. D.; Martin, J.; Pahle, J.; Stephenson, M.; Selmon, J.; Bose, D.

    1999-01-01

    The goal of the Hyper-X program is to demonstrate and validate technology for design and performance predictions of hypersonic aircraft with an airframe-integrated supersonic-combustion ramjet propulsion system. Accomplishing this goal requires flight demonstration of a hydrogen-fueled scramjet powered hypersonic aircraft. A key enabling technology for this flight demonstration is flight controls. Closed-loop flight control is required to enable a successful stage separation, to achieve and maintain the design condition during the engine test, and to provide a controlled descent. Before the contract award, NASA developed preliminary flight control laws for the Hyper-X to evaluate the feasibility of the proposed scramjet test sequence and descent trajectory. After the contract award, a Boeing/NASA partnership worked to develop the current control laws. This paper presents a description of the Hyper-X Research Vehicle control law architectures with performance and robustness analyses. Assessments of simulated flight trajectories and stability margin analyses demonstrate that these control laws meet the flight test requirements.

  8. Proposal for the award of a contract for the maintenance and operation of CERN's sewage installations

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the maintenance and operation of CERN's sewage installations. The Finance Committee is invited to agree to the negotiation of a contract with VALLIER ASSAINISSEMENT (FR), the lowest bidder, for the maintenance and operation of CERN's sewage installations for a period of three years for a total amount of 1 745 897 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period.

  9. Proposal for the award of a contract for the supply of Cabletron gigabit routers

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of Cabletron gigabit routers. Following a call for tenders (IT-2870/IT) sent on 14 July 2000 to 13 firms in three Member States, CERN received, by the closing date, tenders from four firms in one Member State. The Finance Committee is invited to agree to the negotiation of a contract with ACN (CH), the lowest bidder, for the supply of Cabletron gigabit routers for a total amount of 1 887 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IE-100%.

  10. 48 CFR 1845.106-70 - NASA contract clauses and solicitation provision.

    Science.gov (United States)

    2010-10-01

    ... will vest in the Government prior to delivery. (e) When approved by the Logistics Management Division... AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 1845.106-70 NASA contract... to the SEMO's concurrence that adequate installation property management resources are available for...

  11. Proposal for the award of an industrial support contract for minor civil-engineering work at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for minor civil-engineering work at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm LOSINGER CONSTRUCTION (CH), the lowest bidder, for the provision of minor civilengineering work at CERN for three years for a total amount not exceeding 2 840 278 Swiss francs, not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  12. 78 FR 4478 - Federal Employees Dental and Vision Insurance Program: Application Process for Contract Awards

    Science.gov (United States)

    2013-01-22

    ... process is being changed to be in line with the process used for the Federal Employees Health Benefits... OFFICE OF PERSONNEL MANAGEMENT Federal Employees Dental and Vision Insurance Program: Application... Process for Federal Employees Dental and Vision Insurance Program Contract Awards. SUMMARY: The U. S...

  13. Proposal for the award of an industrial services contract for computer centre operations

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for Computer Centre operations. Following a market survey carried out among 40 firms in eleven Member States, a call for tenders (IT-2871/IT) was sent on 9 March 2001 to nine firms and one consortium consisting of two firms in six Member States. By the closing date, CERN had received three tenders from two firms and one consortium in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium DCS (CH) - INTRASOFT (GR), the lowest bidder, for an initial period of three years from 1 October 2001 for a total amount of 2 196 588 Swiss francs, not subject to revision until 30 September 2002. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH-55% ; GR-45%.

  14. 41 CFR 105-74.605 - Award.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Award. 105-74.605 Section 105-74.605 Public Contracts and Property Management Federal Property Management Regulations System...-GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Definitions § 105-74.605 Award. Award...

  15. Should the District Courts Have Jurisdiction Over Pre-Award Contract Claims? A Claim for the Claims Court

    National Research Council Canada - National Science Library

    Short, John J

    1987-01-01

    This thesis briefly examines the jurisdiction of the federal district courts and the United States Court of Claims over pre-award contract claims before the Federal Courts Improvement Act of October 1...

  16. The NASA Plan: To award eight percent of prime and subcontracts to socially and economically disadvantaged businesses

    Science.gov (United States)

    1990-01-01

    It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.

  17. Defense Contract Management: DOD's Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    National Research Council Canada - National Science Library

    Hutton, John P; Ahearn, Marie; Augustine, Penny B; Campbell, Greg; James, Jr., Arthur; Lesonsky, Eric; Lord, Stephen; McDonough-Hughes, Anne; McKelvey, Janet; Patton, Kenneth

    2007-01-01

    .... The contract was also used to ensure adequate fuel supplies inside Iraq. RIO I was a cost-plus-award-fee type contract that provided for payment of the contractor's costs, a fixed fee determined at inception of the contract, and a potential award fee...

  18. Proposal for the award of three contracts for the provision of temporary labour on the CERN site

    CERN Document Server

    2006-01-01

    This document concerns the award of three contracts for the provision of temporary labour on the CERN site. The Finance Committee is invited to agree to the negotiation of three contracts for the provision of temporary labour on the CERN site with CREYF'S (CH), VEDIOR (CH), and ALPEMPLOI (CH) for a total combined maximum amount for three years for all three contracts of 12 000 000 Swiss francs, not subject to revision, for an initial period of three years from 1 July 2006. The contracts will include options for two further one-year extensions beyond the initial three-year period. 2006/62/5/e

  19. Proposal for the award of a contract for software support services for industrial control systems

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for software support services for industrial control systems, including maintenance of existing systems and development of new applications. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ASSYSTEMS (FR) - INBIS (GB), the lowest bidder, for software support services for industrial control systems, including maintenance of existing systems and development of new applications, for a period of three years for a total amount not exceeding 1 281 057 euros (1 998 530 Swiss francs), not subject to revision for the first two years. The rate of exchange used is that stipulated in the tender. The contract will include options for two one-year extensions beyond the initial three-year period.

  20. Proposal for the award of an industrial support contract for operation of the Computer Centre at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for operation of the Computer Centre at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the consortium DATA CONVERSION SYSTEMS (CH) - INTRACOM BULGARIA (BG), the lowest bidder, for the operation of the Computer Centre at CERN for a period of three years for a total amount not exceeding 2 046 570 Swiss francs, not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial three-year period. 2006/55/5/e

  1. Small business innovation research: Abstracts of 1984. Phase 1 awards

    Science.gov (United States)

    1985-01-01

    On September 27, 1984, the National Aeronautics and Space Administration announced the selection of Phase I projects for the Small Business Innovation Research Program. These awards resulted from the evaluation of proposals submitted in response to the 1984 Program Solicitation, SBIR 84-1. In order to make available information on the technical content of the Phase I projects supported by the NASA SBIR Program, the abstracts of those proposals which resulted in awards of contracts are given. In addition, the name and address of the firm performing the work are given for those who may desired additional information about the project. Propulsion, aerodynamics, computer techniques, exobiology and composite materials are among the areas covered.

  2. Proposal for the award of an industrial support contract for transport and handling services

    CERN Document Server

    1999-01-01

    This document concerns the award of an industrial support contract for transport and handling services. Following a market survey carried out among 49 firms in nine Member States, a call for tenders (IT-2395/ST/Revised) was sent on 7 April 1999 to two firms and six consortia in seven Member States. By the closing date, CERN had received six tenders. The Finance Committee is invited to agree to the negotiation of a contract with the consortium DELATTRE-LEVIVIER (FR) ? BELLELI (IT) ? SETROVA (PT) the lowest bidder complying with the specification, for an initial period of three years, from 1st May 2000, for a total amount not exceeding 22 000 000 Swiss francs, not subject to revision until 30 April 2003. The contract will include an option for two one-year extensions beyond the initial three-year period.

  3. Contract policy for CERN staff members

    CERN Multimedia

    HR Department

    2009-01-01

    Public information meeting on Monday 28 September 2009 at 10.00 a.m. With effect from 1 August 2009, new provisions regarding staff employment contract policy have entered into force. These provisions are set out in: The Staff Rules and Regulations and Administrative Circular No. 2 (Rev. 4). Further details are available in: Frequently Asked Questions. The new provisions are outlined below: Limited-duration contracts From 1 August 2009, limited-duration contracts will be awarded for a maximum period of five years (instead of four years previously) and no extensions beyond five years will be granted. Contracts for periods shorter than five years can be exceptionally awarded, e.g. for a project whose mission or financial resources are time-limited. Indefinite contracts : award procedure A number of changes have been introduced regarding the procedure for the award of indefinite contracts. From now on, posts leading to the award of an indefinite contract will be opened at le...

  4. 48 CFR 3427.472 - Advertising of awards clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Advertising of awards... Copyrights 3427.472 Advertising of awards clause. The contracting officer shall insert the clause in 3452.227-72, Advertising of Awards, in all solicitations and contracts other than purchase orders. ...

  5. Proposal for the award of a contract, without competitive tendering, for the maintenance of low-voltage switchgear

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the maintenance of low-voltage switchgear. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, for the maintenance of low-voltage switchgear with HAZEMEYER (FR) for a total amount of 385 000 euros (610 000 Swiss francs), covering an initial period of five years, subject to revision for inflation after 1 January 2007. The contract will include options for two one-year extensions beyond the initial five-year period. The amount in Swiss francs has been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  6. Proposal for the award of an industrial services contract for software support for industrial controls

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for software support for industrial controls. Following a market survey carried out among 68 firms in twelve Member States, a call for tenders (IT-2711/ST) was sent on 12 April 2000 to nine firms and five consortia in eight Member States. By the closing date, CERN had received seven tenders from two firms and five consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the firm GTD (ES), the lowest bidder, for an initial period of three years from 1 October 2000, for a total amount not exceeding 4 500 000 Swiss francs, not subject to revision. The contract will include an option for two one-year extensions beyond the initial three-year period. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: ES?100%.

  7. Proposal for the award of an industrial support contract for paintwork, false ceilings, plasterwork and false floors at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for paintwork, false ceilings, plasterwork and false floors at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm PREZIOSO (FR), the lowest bidder, for the provision of paintwork, false ceilings, plasterwork and false floors at CERN for a period of three years for a total amount not exceeding 538 419 euros (830 381 Swiss francs), not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial threeyear period.

  8. Proposal for the award of an industrial support contract for minor metalwork, metal fittings, cladding and roofing at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for minor metalwork, metal fittings, cladding and roofing at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm INIZIATIVE INDUSTRIALI SRL (IT), the lowest bidder, for the provision of minor metalwork, metal fittings, cladding and roofing at CERN for three years for a total amount not exceeding 1 467 895 euros (2 258 301 Swiss francs), not subject to revision for two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  9. An Analysis of Protests of Contracts Awarded Using the Best Value Trade-Off Process from January 1998 Through December 1999

    National Research Council Canada - National Science Library

    Burns, Casey

    2000-01-01

    The purpose of this thesis is to analyze protests of contract awards brought before the Comptroller General, General Accounting Office from January 1998 through December 1999 as a means to identify...

  10. The Hammer Award is presented to KSC and 45th Space Wing.

    Science.gov (United States)

    1999-01-01

    KSC's Director of Public Affairs Joe Gordon (left) applauds as Ed Gormel and Chris Fairey are named recipients of the Hammer Award at a special presentation in the IMAX 2 Theater in the Kennedy Space Center Visitor Complex. Presenting the award is Morley Winograd (at the podium), director of the National Partnership for Reinventing Government. The Hammer Award is Vice President Al Gore's special recognition of teams of federal employees who have made significant contributions in support of the principles of the National Partnership for Reinventing Government. This Hammer Award acknowledges the accomplishments of a joint NASA and Air Force team that established the Joint Base Operations and Support Contract (J-BOSC) Source Evaluation Board (SEB). Gormel and Fairey are co-chairs of the SEB. The team developed and implemented the acquisition strategy for establishing a single set of base operations and support service requirements for KSC, Cape Canaveral Air Station and Patrick Air Force Base.

  11. Proposal for the award of an industrial support contract for cooling water treatment

    CERN Document Server

    1999-01-01

    This document concerns the award of an Industrial Support contract for cooling water treatment for LEP, PS and SPS. Following a market survey carried out among 46 firms in twelve Member States, a call for tenders (IT-2557/ST) was sent on 26 July 1999 to seven firms and two consortia in five Member States. By the closing date, CERN had received five tenders from firms and consortia in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium AQUAZUR (FR) and SCHILLING CHEMIE (DE), the lowest bidder after realignment, for an initial period of three years, starting on 1 January 2000, for a total amount not exceeding 976 482 Swiss francs, not subject to revision until 31 December 2001. The contract will include options for two further one-year extensions beyond the initial three year period. The consortium has indicated the following distribution by country of the work covered by this adjudication proposal: FR - 52% and DE - 48%.

  12. Proposal for the award of a contract, without competitive tendering, for the maintenance of uninterruptable power supply systems

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the maintenance of uninterruptable power supply systems. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, for the maintenance of uninterruptable power supply systems with MGE (FR) for a total amount of 575 000 euros (911 000 Swiss francs), covering an initial period of five years, subject to revision for inflation after 1 January 2007. The contract will include options for two one-year extensions beyond the initial five-year period. The amount in Swiss francs has been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  13. Proposal for the award of three contracts for the supply and delivery of liquid nitrogen

    CERN Document Server

    2001-01-01

    This document concerns the award of three contracts for the supply and delivery of liquid nitrogen. A call for tenders (IT-3016/LHC) was sent on 21 September 2001 to 24 firms in eight Member States. By the closing date, CERN had received tenders from four firms in one Member State. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of the following three contracts: - a contract with PRAXAIR (FR), the lowest bidder, for the supply of up to 20 000 metric tons of liquid nitrogen over a period of three years for an amount not exceeding 2 486 000 Swiss francs, not subject to revision. - a contract with MESSER FRANCE (FR), the second lowest bidder, for the supply of up to 15 000 metric tons of liquid nitrogen over a period of three years for an amount not exceeding 1 292 542 euros (1 905 000 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. - a contract with AIR PRODUCTS (FR), the third lowest bidd...

  14. Proposal for the award of a contract for industrial support for logistics and stores operations

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for industrial support for logistics and stores operations. Following a market survey carried out among 59 firms in ten Member States, a call for tenders (IT-2401/SPL/Revised) was sent on 11 March 1999 to five firms and four consortia in five Member States. By the closing date, CERN had received eight tenders from five Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ISS GEBÄUDESERVICE (DE) - ISS SERVISYSTEM (CH) the lowest bidder complying with the specification, for industrial support for logistics and stores operations over a period of three years, starting on 1st January 2000, for a total amount of 3 830 000 Swiss francs, not subject to revision. The contract will include an option for two one-year extensions beyond the initial three-year period.

  15. Final Report on the Audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company

    Science.gov (United States)

    1990-12-03

    This is our final report on the audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company (MCAIR). The Contract Management Directorate made the audit from October 1989 through June 1990. The objective of the audit was to compare proposed and negotiated subcontract prices and determine reasons for significant variances. We also evaluated applicable internal control procedures. For a 6-month period ending December 1989, MCAIR issued 517 subcontracts valued at $679 million.

  16. Proposal for the award of an industrial support contract for operation of the CERN telephone system

    CERN Document Server

    1999-01-01

    This document concerns the award of an industrial support contract for operation of the CERN telephone system. Following a market survey carried out among 22 firms in eight Member States, a call for tenders (IT-2655/ST) was sent on 27 August 1999 to three firms and two consortia in four Member States. By the closing date, CERN had received three tenders from one firm and two consortia in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium MERROW (UK) ? DCS (CH) the lowest bidder, for an initial period of three years from 1st January 2000, for a total amount not exceeding 850 000 Swiss francs, not subject to revision until 31 December 2000. The contract will include an option for two one-year extensions beyond the initial three-year period.

  17. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  18. Proposal for the Award of a Blanket Purchase Contract for the Supply of PC Servers

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply and the hardware support of Windows compatible PC servers for a three-year period with a view to maintaining and evolving CERN's Windows infrastructure over the coming years. Following a market survey carried out among 38 firms in eleven Member States, a call for tenders (IT-2955/IT) was sent on 27 January 2003 to six firms in two Member States. By the closing date, CERN had received two tenders from two firms in one Member State. The Finance Committee is invited to agree to the negotiation of a three-year blanket purchase contract with ELONEX (CH), the lowest bidder complying with the specification, for the supply of Windows compatible PC servers for a total amount not exceeding 1 100 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: GB - 100%.

  19. Vacancy notices for posts opened with a view to the award of indefinite contracts

    CERN Multimedia

    2013-01-01

    We are pleased to inform you that the list of posts opening with a view to the award of indefinite contracts is now available on the intranet (see here).   The publication timeframe for the corresponding vacancy notices will be from 9 August to 8 September. Interviews with candidates by the CERN Contract Review Boards (CCRB) will be held between the end of September and mid-November. A provisional schedule will be published for your reference on the intranet as soon as it is available. Should you wish to apply for a post, please note that it is your responsibility to ensure your application is submitted by the deadline of 8 September. Finally, we would like to invite you to attend one of the information sessions to explain the exercise on any of the following dates: HR Department

  20. Proposal for the award of an industrial support contract for radiation monitoring services for LEP dismantling

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Service contract for radiation monitoring services for LEP dismantling. Following a market survey carried out among 34 firms in nine Member States, a call for tenders (IT-2769/SL/LEP) was sent on 13 March 2000 to seven firms and three consortia in five Member States. By the closing date, CERN had received six tenders from three firms and three consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ISS MULTISERVICE (CH), NFI (SE) and ISS GEBÄUDESERVICE (DE), the lowest technically qualified bidder, for radiation monitoring services for LEP dismantling for a total amount of 990 792 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH-59%, DE-26%, SE-15%.

  1. 41 CFR 105-72.204 - Special award conditions.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Special award conditions. 105-72.204 Section 105-72.204 Public Contracts and Property Management Federal Property Management... award conditions. If an applicant or recipient: (a) Has a history of poor performance, (b) Is not...

  2. 48 CFR 452.216-70 - Award Fee.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Award Fee. 452.216-70... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 452.216-70 Award Fee. As prescribed in 416.405, insert a clause substantially as follows: Award Fee (FEB 1988) The amount of award fee...

  3. Proposal for the award of an industrial support contract for dismantling LEP cooling and ventilation equipment

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Service contract for dismantling LEP cooling and ventilation equipment. Following a market survey carried out among 68 firms in fourteen Member States, a call for tenders (IT-2658/ST/SL) was sent on 11 February 2000 to 14 firms and one consortium in eight Member States. By the closing date, CERN had received nine tenders from seven firms and two consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the firm ZVVZ (CZ), the lowest bidder, for a total amount of 822 005 Swiss francs, not subject to revision. The contract will include options for additional dismantling work in the LEP structure, specified in the tender, for a total amount of 313 311 Swiss francs, not subject to revision, bringing the total amount to a maximum of 1 135 316 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CZ-100%.

  4. Proposal for the award of a contract for the supply of motor unit for the jacks for the LHC low-beta quadrupoles

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for the supply of 134 motor units for the jacks for the LHC low-beta quadrupoles. The Finance Committee is invited to agree to the negotiation of a contract with ZTS VVU KOSICE (SK), the lowest bidder, for the supply of 134 motor units for a total amount of 1 266 674 Swiss francs, not subject to revision.

  5. Proposal for the award of a contract for the supply of connection boxes for electrical racks for the LHC magnets

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract for the supply of 1670 connection boxes for two different types of electrical racks for the LHC magnets. The Finance Committee is invited to agree to the negotiation of an ex-works contract with CRAWFORD, HANSFORD & KIMBER (GB), for the supply of 1670 connection boxes for a total amount of 473 774 pounds sterling (1 080 442 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender.

  6. Proposal for the award of a contract for cleaning on the Swiss part of the CERN site

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for cleaning on the Swiss part of the CERN site. The Finance Committee is invited to agree to the negotiation of a contract with TOP-NET SERVICES (CH), the lowest bidder complying with the specification, for the provision of cleaning and building maintenance work on the Swiss part of the CERN site for three years for a total amount of 5 841 159 Swiss francs, not subject to revision until 1 January 2009, with options for additional services for an additional amount of 350 000 Swiss francs, not subject to revision until 1 January 2009, bringing the total amount to 6 191 159 Swiss francs, not subject to revision until 1 January 2009. The contract will include options for two one-year extensions beyond the initial three-year period.

  7. NASA Chandra X-ray Observatory Selected as Editor's Choice in 2000 Discover Magazine Awards for Technological Innovation

    Science.gov (United States)

    2000-06-01

    The Chandra X-ray Observatory, NASA's newest and most powerful X-ray space telescope, has been selected as the winner of the Editor's Choice category of the 2000 Discover Magazine Awards for Technological Innovation. The team of government, industry, university and research institutions that designed, built and deployed Chandra for NASA's Marshall Space Flight Center, Huntsville, Ala, will be formally recognized June 24 at a gala awards celebration at Epcot at the Walt Disney World Resort in Orlando, Fl. Dr. Harvey Tananbaum, director of the Smithsonian Astrophysical Observatory's Chandra X-ray Science Center, Cambridge, Mass., which conducts the Chandra science mission for NASA, will receive the award on behalf of the team. "Chandra has opened a new window for astronomers into the universe of high-energy cosmic events such as pulsars, supernova remnants and black holes," said Tananbaum. "We're now able to create spectacularly detailed images of celestial phenomena whose mere existence we could only hypothesize before." Among Chandra's most significant discoveries to date, he lists the detection of a giant ring around the heart of the Crab Nebula, details of the shock wave created by an exploding star and resolution of the high-energy X-ray "glow" in the universe into millions of specific light sources. "The successful launch, deployment and on-orbit operations of NASA's Chandra X-ray Observatory is a testament to the solid partnership between TRW, NASA and the science community that has been enabling NASA's most important space science missions for the past 40 years," said Timothy W. Hannemann, executive vice president and general manager, TRW Space & Electronics Group. "The extraordinary images that Chandra is delivering daily speaks loudly not only to the quality of the science instruments on board, but also to the engineering talents and dedication to mission success exhibited by every member of NASA's Chandra mission team." Chandra, named in honor of Nobel

  8. Proposal for the award of a contract for the provision of cooling water treatment services

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for cabling and minor mechanical work on components of CERN accelerators and experiments. Following a market survey carried out among 62 firms in fifteen Member States, a call for tenders (IT-3214/EST/A) was sent on 1 August 2003 to three firms and two consortia in four Member States. By the closing date, CERN had received four tenders from four consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium AMEC SPIE (FR) - CEGELEC (FR) - AMEC SPIE (NL), the lowest bidder, for cabling and minor mechanical work on components of CERN accelerators and experiments for a total amount not exceeding 1 040 968 euros (1 608 915 Swiss francs), covering an initial period of three years starting on 1 January 2004, not subject to revision. The rate of exchange used is that stipulated in the tender. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium ...

  9. 10 CFR 1023.329 - Payment of award.

    Science.gov (United States)

    2010-01-01

    ... official. The agency will pay the amount awarded to the applicant within 60 days. ... 10 Energy 4 2010-01-01 2010-01-01 false Payment of award. 1023.329 Section 1023.329 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) CONTRACT APPEALS Procedures Relating to Awards Under the Equal...

  10. Forthcoming indefinite contract review procedure

    CERN Multimedia

    Human Resources Department

    2011-01-01

    The vacancy notices for posts opened with a view to the award of an indefinite contract will be published in early April 2011. In the meantime, the list of posts to be opened this spring is available at the following address: Indefinite contract posts - spring 2011 A second exercise will take place in autumn 2011 and, as of 2012, the indefinite contract award procedure will only be held once a year, in autumn. For more information please consult: https://hr-recruit.web.cern.ch/hr-recruit/staff/IndefiniteContracts.asp  

  11. 22 CFR 226.47 - Contract administration.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Contract administration. 226.47 Section 226.47 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.47 Contract administration. A...

  12. 22 CFR 226.48 - Contract provisions.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Contract provisions. 226.48 Section 226.48 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.48 Contract provisions. The...

  13. Proposal for the award of an industrial support contract for the handling of the organization?s mail

    CERN Document Server

    1999-01-01

    This document concerns the award of an Industrial Support contract for the handling of the Organization?s mail. Following a market survey carried out among 37 firms in nine Member States, a call for tenders (IT-2402/AS/Revised) was sent on 10 August 1999 to three firms and three consortia, in five Member States. By the closing date, CERN had received five tenders from firms and consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ISS GEBÄUDESERVICE (DE) - ISS SERVISYSTEM (CH), the lowest bidder, for an initial period of three years starting on 1st April 2000, for a total amount of 2 050 000 Swiss francs, not subject to revision until 31 March 2001. The contract will include options for two one-year extensions beyond the initial three-year period.

  14. 13 CFR 124.504 - What circumstances limit SBA's ability to accept a procurement for award as an 8(a) contract?

    Science.gov (United States)

    2010-01-01

    ... performing Government contracts awarded outside the 8(a) BD program, and does not apply to follow-on or... its performance of the requirement ended within 30 days of the procuring activity's offer of the... which would be considered a “new” requirement as compared to any of the previous smaller requirements...

  15. Proposal for the award of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment with SCHNEIDER (FR) for a total amount of 1 100 000 euros (1 742 000 Swiss francs), covering an initial period of five years, subject to revision for inflation after 1 January 2007. The contract will include options for two one-year extensions beyond the initial five-year period. The amount in Swiss francs has been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  16. 48 CFR 14.201-1 - Uniform contract format.

    Science.gov (United States)

    2010-10-01

    ... regulation that are inconsistent with the uniform contract format. (5) Firm-fixed-price or fixed-price with economic price adjustment acquisitions that use the simplified contract format (see 14.201-9). (b... shall retain it in the contract file. (See 4.1201(c).) Award by acceptance of a bid on the award portion...

  17. Drilling contracts and incentives

    International Nuclear Information System (INIS)

    Osmundsen, Petter; Sorenes, Terje; Toft, Anders

    2008-01-01

    Shortages of rigs and personnel have encouraged discussion of designing incentive contracts in the drilling sector. However, for the drilling contracts, there are not a large variety of contract types in use. This article describes and analyses incentives for drilling contractors. These are directly represented by the compensation formats utilised in the present and in the consecutive drilling contracts. Indirectly, incentives are also provided by the evaluation criteria that oil companies use for awarding drilling assignments. Changes in contract format pose a number of relevant questions relating to resource management, and the article takes an in-depth look at some of these. Do evaluation criteria for awarding drilling assignments encourage the development of new technology and solutions? How will a stronger focus on drilling efficiency influence reservoir utilisation?

  18. Proposal for the award of a contract for the maintenance of industrial transport and handling equipment

    CERN Document Server

    European Organization for Nuclear Research

    2002-01-01

    This document concerns the award of a contract for the maintenance of industrial transport and handling equipment. Following a market survey carried out among 145 firms in sixteen Member States, a call for tenders (IT-3049/ST) was sent on 8 May 2002 to two firms and four consortia, one consortium consisting of three firms and three consortia consisting of two firms, in three Member States. By the closing date, CERN had received six tenders from six consortia in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC (FR), SPIE-TRINDEL (FR), ELECTRON (NL) and FENWICK-LINDE (FR), the lowest bidder after alignment, for the maintenance of industrial transport and handling equipment for a total amount of 2 973 280 euros (4 346 900 Swiss francs), covering an initial period of three years starting on 1 October 2002, subject to revision for inflation from 1 October 2005. The contract will include an option for two further one-year extensions beyond t...

  19. Proposal for the award of a contract to measure the geometry of the LHC cryo-magnets

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract to measure the geometry of the LHC cryo-magnets. Following a market survey carried out among 43 firms in eleven Member States, a call for tenders (IT-2989/EST/LHC) was sent on 10 March 2003 to one firm and three consortia, in seven Member States. By the closing date, CERN had received three tenders from the three consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SETAT (FR), INTROTECH (NL) and MAP (CH), the lowest bidder, to measure the geometry of the LHC cryo-magnets, for an amount not exceeding 2 097 582 euros (3 173 347 Swiss francs) covering an initial period of three years starting on 1 October 2003, subject to revision for inflation from 1 October 2004. The rate of exchange used is that stipulated in the tender. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of th...

  20. 22 CFR Appendix A to Part 226 - Contract Provisions

    Science.gov (United States)

    2010-04-01

    ... Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Pt. 226, App. A Appendix A to Part 226—Contract Provisions All contracts, awarded by... Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any...

  1. 48 CFR 216.470 - Other applications of award fees.

    Science.gov (United States)

    2010-10-01

    ... award fees. 216.470 Section 216.470 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contracts 216.470 Other applications of award fees. See PGI 216.470 for guidance on other applications of award fees. [71 FR 39008, July 11, 2006] ...

  2. 48 CFR 3452.227-72 - Advertising of awards.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Advertising of awards... Clauses 3452.227-72 Advertising of awards. As prescribed in 3427.472, insert the following clause in all solicitations and contracts other than purchase orders: Advertising of Awards (AUG 1987) The contractor agrees...

  3. Proposal to endorse the award of a contract for the supply of a juniper T320 network router

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of a JUNIPER T320 Network Router. The Finance Committee is invited to endorse the CERN Management's decision to negotiate a contract with QWEST COMMUNICATION (USA) for the supply of a JUNIPER T320 Network Router for a total amount not exceeding 265 000 US dollars (350 000 Swiss francs). The Finance Committee is also requested to approve the negotiation of a maintenance contract for a value not exceeding 50 000 US dollars (66 000 Swiss francs) for three years and the option to purchase additional network interfaces for a value not exceeding 100 000 US dollars (132 000 Swiss francs) bringing the total amount to 415 000 US dollars (548 000 Swiss francs), not subject to revision. CERN's contribution will not exceed 90 000 Swiss francs. The amounts in Swiss francs have been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CA - 100%.

  4. Proposal for the award of an industrial services contract for installation and removal of cables for CERN accelerators

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for installation and removal of cables for CERN accelerators. Following a market survey carried out among 128 firms in sixteen Member States, a call for tenders (IT-2760/ST) was sent on 2 June 2000 to eight firms and six consortia, four consisting of two firms, one consisting of three firms and one of four firms, in nine Member States. By the closing date, CERN had received tenders from one firm and six consortia, in nine Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium FABRICOM (BE) - AMSE (FR), the lowest bidder, for an initial period of three years from 1 July 2001 for a total amount of 18 000 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: PL-40%, FR-35%, BE-2...

  5. Proposal for the award of an industrial services contract for civil engineering superstructure and internal construction building work

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for civil engineering superstructure and internal construction building work. Following a market survey carried out among 112 firms in fifteen Member States, a call for tenders (IT-2546/ST/Rev.) was sent on 12 April 2001 to eleven consortia, four consisting of four firms, three consisting of three firms and four consisting of two firms, in seven Member States. By the closing date, CERN had received tenders from eight consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE CITRA SUD-EST(FR)-ANTIRUST TECHNOLOGY (GR), the lowest bidder, for an initial period of three years from 1 January 2002 for an amount not exceeding 15 375 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this ...

  6. Proposal for the award of an industrial services contract for operation of the hostels, apartments and ancillary premises

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for operation of the hostels, apartments and ancillary premises run by the CERN Housing Service. Following a market survey carried out among 32 firms in ten Member States, a call for tenders (IT-2404/AS/Rev.) was sent on 5 April 2000 to one firm and three consortia in four Member States. By the closing date, CERN had received tenders from the firm and the three consortia. The Finance Committee is invited to agree to the negotiation of a contract with the consortium VIENNA INTERNATIONAL HOTEL MANAGEMENT (AT) - SEREG (CH), the lowest bidder, for an initial period of five years, to enter into force on 1 January 2001, for a total amount of 6 871 850 Swiss francs, not subject to revision until 31 December 2001. The contract will include an option for two one-year extensions beyond the initial five-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH-60%, AT-...

  7. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    and supply chain management policies in an effort to deliver higher returns for their companies ( KPMG , 2012). As purchasing becomes increasingly more...conservation, hazardous materials , and ozone-depleting substances (NCMA, 2011). Contract Structures (1.5) has to do with identifying specific contract types...discusses time and material contracts as well as cost, performance, and delivery incentives. Incentive and award-fee contracts pertaining to fixed-price

  8. Proposal for the award of a blanket contract for the supply of encapsulated-winding dry-type power transformers

    CERN Document Server

    2000-01-01

    This document concerns the award of a blanket contract for the supply of encapsulated-winding dry-type power transformers. Following a market survey carried out among 75 firms in seventeen Member States, a call for tenders (IT-2745/ST) was sent on 5 May 2000 to eight firms in four Member States. By the closing date, CERN had received tenders from six firms in four Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with TESAR (IT), the lowest bidder, for the supply of encapsulated-winding dry-type power transformers for a total amount of 6 150 000 000 Italian lira, not subject to revision until 31 December 2002. At the exchange rate stipulated in the tender, this amount is equivalent to approximately 5 000 000 Swiss francs. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT - 78%, NO - 17% and DE - 5%.

  9. 48 CFR 315.371 - Contract preparation and award.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 315.371 Contract... the contract until the finance office certifies that the funds are available for obligation. ...

  10. 48 CFR 916.504 - Indefinite-quantity contracts.

    Science.gov (United States)

    2010-10-01

    ... indefinite-quantity, multiple award contracts to ensure that adequate consideration exists to contractually... contracts. 916.504 Section 916.504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Indefinite-Delivery Contracts 916.504 Indefinite-quantity...

  11. Proposal for the Award of a Contract for the Supply of Industrial Pressure Transducers for the LHC

    CERN Document Server

    2002-01-01

    This document concerns the award of a contract for the supply of industrial pressure transducers for the LHC. Following a market survey carried out among 47 firms in eight Member States and a price enquiry (DO-19000/LHC/LHC) for qualifying prototypes sent to 12 firms in three Member States, a call for tenders (IT-2815/LHC/LHC) was sent on 19 September 2002 to two firms in one Member State. By the closing date, CERN had received two tenders from two firms. The Finance Committee is invited to agree to the negotiation of a contract with BAUMER ELECTRIC (CH), the lowest bidder, for the supply of 594 pressure transducers for a total amount of 343 028 Swiss francs, not subject to revision, with options for up to 60 additional pressure transducers, for an additional amount of 34 649 Swiss francs, not subject to revision, bringing the total amount to 377 677 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: ...

  12. Proposal for the award of an industrial services contract for maintenance of fire and gas detection and evacuation alarm systems

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for maintenance of fire and gas detection and evacuation alarm systems. Following a market survey carried out among 48 firms in fourteen Member States, a call for tenders (IT-2818/ST) was sent on 15 December 2000 to four firms and three consortia, each consisting of two firms, in five Member States. By the closing date, CERN had received tenders from one firm and three consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SCHRACK SECONET (AT) - SOTEB (FR), the lowest bidder, for an initial period of three years from 1 October 2001 for an amount not exceeding 5 800 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: AT-50%, FR-50%.

  13. ATLAS Award for Difficult Task

    CERN Multimedia

    2004-01-01

    Two Russian companies were honoured with an ATLAS Award, for supply of the ATLAS Inner Detector barrel support structure elements, last week. On 23 March the Russian company ORPE Technologiya and its subcontractor, RSP Khrunitchev, were jointly presented with an ATLAS Supplier Award. Since 1998, ORPE Technologiya has been actively involved in the development of the carbon-fibre reinforced plastic elements of the ATLAS Inner Detector barrel support structure. After three years of joint research and development, CERN and ORPE Technologiya launched the manufacturing contract. It had a tight delivery schedule and very demanding specifications in terms of mechanical tolerance and stability. The contract was successfully completed with the arrival of the last element of the structure at CERN on 8 January 2004. The delivery of this key component of the Inner Detector deserves an ATLAS Award given the difficulty of manufacturing the end-frames, which very few companies in the world would have been able to do at an ...

  14. Proposal for the award of a contract, without competitive tendering, for the supply and upgrade of positioning sensors for the LHC

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of 60 new Hydrostatic Leveling Systems (HLS sensors) and 25 new Wire Positioning Systems (WPS sensors) and for the upgrade of 63 existing sensors. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of a contract with FOGALE NANOTECH (FR), for the supply and upgrade of HLS and WPS sensors for a total amount of 412 913 euros (631 757 Swiss francs), not subject to revision. The amount in Swiss francs has been calculated using the present rate of exchange.

  15. Proposal for the award of a contract for the construction of an on-site hostel at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the construction of an on-site hostel at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the consortium BATIFLEX (GB) - BATINEG (CH), the lowest bidder, for the construction of an on-site hostel at CERN for a total amount of 5 290 000 Swiss francs, not subject to revision. However, for the reasons explained in this document, the Management wishes to request the Finance Committee to give consideration to the approval of a variant to the original specification to allow use to be made of part of an existing building for the reasons detailed in this document, at an additional cost of 350 000 Swiss francs, not subject to revision, bringing the total construction cost to 5 640 000 Swiss francs.

  16. Proposal for the award of a contract for the upgrade of clean and waste water systems for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the upgrade of clean and waste water systems for the LHC. Following a market survey carried out among 61 firms in thirteen Member States, a call for tenders (IT-3176/ST/LHC) was sent on 28 May 2003 to four firms and four consortia in six Member States. By the closing date, CERN had received six tenders from two firms and four consortia in five Member States. The Finance Committee is invited to agree to the negotiation of a contract with ABB (CH), the lowest bidder, for the upgrade of clean and waste water systems for the LHC for a total amount of 920 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 35%; FR - 31%; CH - 17%; SE - 13%; DK - 4%.

  17. Proposal for the award of a contract for the assembly of MQ-DS type cold masses for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the assembly of 32 MQ-DS type cold masses for the short straight sections of the dispersion suppressor and matching regions of the LHC. Following a call for tenders (IT-3062/AT/LHC) sent on 5 September 2003 to six firms in three Member States, CERN received two tenders from two firms in two Member States. The Finance Committee is invited to agree to the negotiation of a contract with ACCEL INSTRUMENTS (DE), for the assembly of MQ-DS type cold masses of two different dimensions for a total amount of 4 939 194 euros (7 636 000 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 72 %; GB - 23%; IT - 5%.

  18. Proposal for the award of an industrial services contract for the operation and maintenance of liquid helium cryogenic plants

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for the operation and maintenance of liquid helium cryogenic plants. Following a market survey carried out among 54 firms in twelve Member States, a call for tenders (IT-2719/LHC) was sent on 18 August 2000 to two firms and four consortia, two consisting of two firms and two consisting of three firms, in five Member States. By the closing date, CERN had received tenders from one firm and three consortia, in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium AIR LIQUIDE (FR) - LINDE KRYOTECHNIK (CH) - SERCO (DE), the lowest bidder, for an initial period of four years from 17 July 2001 for a total amount of 19 804 400 Swiss francs, not subject to revision until 16 July 2005. The contract will include options for two one-year extensions beyond the initial four-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudi...

  19. Proposal for the award of a contract for provision of mechanical design and draughting services off the CERN site

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract for the provision of mechanical design and draughting services off the CERN site. Following a market survey carried out among 62 firms in fifteen Member States, a call for tenders (IT-3213/EST) was sent on 19 January 2004 to eight firms, in seven Member States. By the closing date, CERN had received eight tenders from eight firms in seven Member States. The Finance Committee is invited to agree to the negotiation of a contract with ACROTECNA (FR), the lowest bidder, for the provision of mechanical design and draughting services off the CERN site for an amount of 489 373 euros (771 882 Swiss francs) for an initial period of three years starting on 1 July 2004, subject to revision for inflation from 1 July 2007. The rate of exchange used is that stipulated in the tender. The contract will include options for two one-year extensions beyond the initial three-year period. The firm has indicated the following distribution by country of the contract value covered by thi...

  20. NASA's Exploration Technology Development Program Energy Storage Project Battery Technology Development

    Science.gov (United States)

    Reid, Concha M.; Miller, Thomas B.; Mercer, Carolyn R.; Jankovsky, Amy L.

    2010-01-01

    Technical Interchange Meeting was held at Saft America s Research and Development facility in Cockeysville, Maryland on Sept 28th-29th, 2010. The meeting was attended by Saft, contractors who are developing battery component materials under contracts awarded through a NASA Research Announcement (NRA), and NASA. This briefing presents an overview of the components being developed by the contractor attendees for the NASA s High Energy (HE) and Ultra High Energy (UHE) cells. The transition of the advanced lithium-ion cell development project at NASA from the Exploration Technology Development Program Energy Storage Project to the Enabling Technology Development and Demonstration High Efficiency Space Power Systems Project, changes to deliverable hardware and schedule due to a reduced budget, and our roadmap to develop cells and provide periodic off-ramps for cell technology for demonstrations are discussed. This meeting gave the materials and cell developers the opportunity to discuss the intricacies of their materials and determine strategies to address any particulars of the technology.

  1. Proposal for the award of a contract for the supply of TCP and TCS collimators for the LHC

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract for the supply of 40 TCP and TCS collimators for the LHC cleaning insertions. The Finance Committee is invited to agree to the negotiation of a contract with CERCA (FR), the lowest bidder, for the supply of 40 collimators for a total amount of 1 122 173 euros (1 718 720 Swiss francs), not subject to revision, with options for up to 11 collimators for an amount of up to 279 280 euros (427 745 Swiss francs), subject to revision for inflation from 1 January 2007, bringing the total amount to 1 401 453 euros (2 146 465 Swiss francs), subject to revision for inflation from 1 January 2007. The rate of exchange used is that stipulated in the tender.

  2. 48 CFR 842.101 - Contract audit responsibilities.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Audit Services 842.101 Contract audit responsibilities. (a) Contracting officers may use the support services of other agencies to the extent feasible. Examples of such services include: pre-award surveys; quality assurance and technical...

  3. Proposal for the award of a contract, without competitive tendering, for the supply of electricity

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of electricity for the period from January 2001 until 30 June 2003. On 13 January 2000 a market survey was sent to 43 firms in sixteen Member States. Following this market survey, CERN received an unsolicited offer from EDF/EOS. With a view to verifying the competitiveness of the offer, three firms and one consortium in four Member States, qualified from the market survey, were requested to submit quotations. CERN received three quotations from two firms and the consortium which indeed confirmed that the offer from EDF/EOS was very competitive. The Finance Committee is invited to agree to the negotiation of a contract with the consortium EDF (FR)/EOS (CH), which submitted the unsolicited offer, for the supply of electricity until June 2003 for a total estimated amount, based on the present schedules of the accelerators for the associated period, of 290 000 000 French francs, not subject to revision. At the present ra...

  4. Comparative Analysis of Multiple-Award Task Order Contracting and Its Impacts on Acquisition Reform

    Science.gov (United States)

    2002-12-01

    24 Figure 2. DoD Improperly Directed Task Order Actions..... 49 Figure 3. Overview of the Domestic B2B Market, 1999-2003. 62 Figure 4...year 2000. The technology schedules amassed nearly $8.1 billion in sales with 60.8 percent of all activity. FSS charges agencies a one percent fee...second with $1 billion in sales . GSA manages five of the ten most lucrative contracts. The National Aeronautical Space Administration’s (NASA

  5. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  6. Defense Threat Reduction Agency > Contracts > Contract Award Data

    Science.gov (United States)

    Integration Command Senior Enlisted Leader Media News News Archive Strategic Plan Videos Mission Research Support Center Contact Us FAQ Sheet Links Success Stories Contracts Business Opportunities Current Justifications & Approvals Careers Who We Are Our Values Strategic Recruiting Programs Professional

  7. Proposal for the award of a contract for the supply and installation of pipelines for the LHC accelerator tunnel

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply and installation of pipelines for the LHC accelerator tunnel. Following a market survey carried out among 92 firms in fifteen Member States, a call for tenders (IT-2682/ST/LHC) was sent on 7 September 2001 to seven firms, seven consortia consisting of two firms and three consortia consisting of four firms, in twelve Member States. By the closing date, CERN had received 11 tenders from five firms and six consortia in ten Member States. The Finance Committee is invited to agree to the negotiation of a contract with RENCO (IT), the lowest compliant bidder, for the supply and installation of pipelines for the LHC accelerator tunnel for a total amount of 21 995 304 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT - 100%.

  8. Proposal for the award of an industrial service contract for stores operations and relatedlogistics, in-house mail distribution and transport services on the CERN site

    CERN Document Server

    2006-01-01

    This document concerns the award of an industrial support contract for stores operations and related logistics, in-house mail distribution and transport services on the CERN site. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ISS (CH) - ISS (ES), for stores operations and related logistics, in-house mail distribution and transport services on the CERN site for a period of three years for a total amount not exceeding 10 312 028 Swiss francs not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period.

  9. 42 CFR 93.204 - Contract.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Contract. 93.204 Section 93.204 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS... MISCONDUCT Definitions § 93.204 Contract. Contract means an acquisition instrument awarded under the HHS...

  10. Proposal for the award of two contracts for the provision of high-speed data circuits to the USA

    CERN Document Server

    2005-01-01

    This document concerns the award of two contracts for high-speed (10 Gbit/s) data circuits for Wide Area Network (WAN) connectivity between CERN and the STARLIGHT Internet exchange in Chicago through the MANLAN Internet exchange in New York, USA, on behalf of a consortium comprising CERN, the US Department of Energy, the World Health Organisation and the Centre de Resources Informatiques de la Haute-Savoie (France). The Finance Committee is invited to agree to the negotiation of two contracts, together covering the provision of up to four high-speed (10 Gbit/s) data circuits to the USA, with: GLOBAL CROSSING (CH) for one 10 Gbit/s circuit between CERN and New York, two 10 Gbit/s circuits between New York and Chicago and Internet access points in Geneva and New York, for a period of three years for a total amount of 2 764 517 Swiss francs, not subject to revision. The contract will include options for one additional 10 Gbit/s circuit between CERN and New York and two additional 10 Gbit/s circuits between New Y...

  11. 14 CFR 1262.310 - Payment of award.

    Science.gov (United States)

    2010-01-01

    ... Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION EQUAL ACCESS TO JUSTICE ACT IN AGENCY... Division, NASA Headquarters, Washington, DC 20546. (b) The Agency will pay the amount awarded to the applicant within 60 days, if feasible, unless judicial review of the award or of the underlying decision of...

  12. 77 FR 5280 - Service Contracts Inventory

    Science.gov (United States)

    2012-02-02

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0023] Service Contracts Inventory AGENCY: Nuclear...) is providing for public information its Inventory of Contracts for Services for Fiscal Year (FY) 2011. The inventory includes service contract actions over $25,000 that were awarded in FY 2011. ADDRESSES...

  13. 78 FR 10642 - Service Contracts Inventory

    Science.gov (United States)

    2013-02-14

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0029] Service Contracts Inventory AGENCY: Nuclear...) is providing for public information its Inventory of Contracts for Services for Fiscal Year (FY) 2012. The inventory includes service contract actions over $25,000 that were awarded in FY 2012. ADDRESSES...

  14. 48 CFR 970.1504-1-9 - Special considerations: Cost-plus-award-fee.

    Science.gov (United States)

    2010-10-01

    ...: Cost-plus-award-fee. 970.1504-1-9 Section 970.1504-1-9 Federal Acquisition Regulations System... Negotiation 970.1504-1-9 Special considerations: Cost-plus-award-fee. (a) When a management and operating contract is to be awarded on a cost-plus-award-fee basis, several special considerations are appropriate...

  15. 48 CFR 1852.216-85 - Estimated cost and award fee.

    Science.gov (United States)

    2010-10-01

    ... and Clauses 1852.216-85 Estimated cost and award fee. As prescribed in 1816.406-70(e), insert the following clause: Estimated Cost and Award Fee (SEP 1993) The estimated cost of this contract is $___. The... cost, base fee, and maximum award fee are $___. (End of clause) Alternate I (SEP 1993). As prescribed...

  16. Small Business Innovation Research GRC Phase I, Phase II, and Post-Phase II Opportunity Assessment for 2015

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.

    2016-01-01

    This report outlines the 2015 Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) Phase I, Phase II, and Post-Phase II opportunity contract award results associated with NASA's Aeronautics Research Mission Directorate (ARMD), Human Exploration and Operations Mission Directorate (HEOMD), Science Mission Directorate (SMD), and Space Technology Mission Directorate (STMD) for NASA Glenn Research Center. The report also highlights the number of Phase I, Phase II, and Post-Phase II contracts awarded by mission directorate. The 2015 Phase I contract awards to companies in Ohio and their corresponding technologies are also discussed.

  17. 75 FR 82095 - Service Contracts Inventory

    Science.gov (United States)

    2010-12-29

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0394] Service Contracts Inventory AGENCY: U.S. Nuclear...) is providing for public information its Inventory of Contracts for Services for Fiscal Year (FY) 2010. The inventory includes service contract actions over $25,000 that were awarded in FY 2010. ADDRESSES...

  18. Proposal for the Award of Three Contracts without competitive tendering or Design Calculations and Drawings for the Reinforced Concrete Work in LEP Surface Buildings and Supervision of their Implementation

    CERN Document Server

    1987-01-01

    Proposal for the Award of Three Contracts without competitive tendering or Design Calculations and Drawings for the Reinforced Concrete Work in LEP Surface Buildings and Supervision of their Implementation

  19. Proposal for the award of a contract for the supply of bake-out heating jackets for the LHC vacuum components

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the supply of bake-out heating jackets for the LHC vacuum components. The Finance Committee is invited to agree to the negotiation of a contract with ELTHERM (DE), the lowest bidder, for the supply of heating jackets for a total amount of 711 567 euros (1 120 646 Swiss francs), not subject to revision, with an option for up to 15% additional heating jackets for an additional amount of up to 106 735 euros (168 097 Swiss francs), not subject to revision, bringing the total amount to 818 302 euros (1 288 743 Swiss francs), not subject to revision. The amounts in Swiss francs have been calculated using the present rate of exchange. 2006/68/5/e

  20. Proposal for the award of blanket contracts for the supply of Intel-based desktop PCs, display monitors and portable PCs

    CERN Document Server

    2000-01-01

    This document concerns the award of blanket contracts for the supply of the three following categories of equipment for the period 2001-2004: a) desktop PCs (complete PC systems but without display monitors), b) display monitors (conventional CRTs or flat screen LCDs) and c) portable PCs (also called notebooks or laptops). Following a market survey carried out among 41 firms in fourteen Member States, an invitation to tender (IT-2692/IT) was sent on 19 May 2000 to 12 firms and three consortia, each consisting of two firms, in five Member States. By the closing date, CERN had received seven tenders, all from the Swiss subsidiaries of the firms and consortia. The Finance Committee is invited to agree to the negotiation of - blanket contracts with VOBIS (CH), ELONEX (CH) and FUJITSU-SIEMENS (CH), the three lowest bidders complying with the specification, for the supply of Desktop PCs; - blanket contracts with VOBIS (CH), SYNOPTIC (CH) and ELONEX (CH), the three lowest bidders offering display monitors manufactur...

  1. Proposal for the award of a contract for the supply of analogue optoelectronic receiver modules for the CMS tracker

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of 12-channel analogue optoelectronic receiver modules for the CMS Tracker. Following a market survey carried out among 56 firms in seventeen Member States and four firms in two non-Member States, a call for tenders (IT-2810/EP/CMS) was sent on 29 June 2001 to one firm in a Member State and one firm in a non-Member State. By the closing date, CERN had received one tender. The Finance Committee is invited to agree to the negotiation of a contract with NGK INSULATORS (JP), the only bidder, for the supply of 4500 units of 12-channel analogue optoelectronic receiver modules for a total amount of 228 485 949 Japanese yen, not subject to revision until 31 December 2003. At the rate of exchange stipulated in the tender, this amount is equivalent to approximately 3 110 500 Swiss francs. CERN's contribution to the total cost is 1 863 967 Swiss francs. The firm has indicated the following distribution by country of the contract value covered by this adjudica...

  2. Proposal for the award of a contract for the provision of a high-speed data circuit to the USA

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for a high-speed data circuit for Wide Area Network (WAN) connectivity between CERN and the STARLIGHT Internet exchange in Chicago, USA. The contract will be negotiated on behalf of CERN and its partners, CNRS/IN2P3 (FR), the US Department of Energy (DoE) through the California Institute of Technology (Caltech), the US National Science Foundation (NSF), the Canadian high-energy physics community through Carleton University and the World Health Organisation in Geneva. Following a market survey carried out among 26 firms in nine Member States and three firms in the USA, a call for tenders (IT-2983/IT) was sent on 7 September 2001 to 17 firms in eight Member States. By the closing date, CERN had received 13 tenders from eight Member States. The Finance Committee is invited to agree to the negotiation, on behalf of CERN and its partners, of a contract for the provision of a high-speed data circuit to the USA, with KPNQWEST (NL), the lowest bidder (after realignment),...

  3. Proposal for the Award of a Contract for the Supply of the Power Units for LHC Thyristor Power Converters

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of 12 power units of thyristor power converters rated from 365 to 770 kW for the LHC. Following a market survey carried out among 98 firms in nineteen Member States, a call for tenders (IT-3003/SL/LHC) was sent on 25 October 2002 to six firms in four Member States. By the closing date, CERN had received five tenders from five firms in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with OCEM (IT), the lowest bidder, for the supply of 12 power units of thyristor power converters for a total amount of 981 484 Swiss francs not subject to revision, with options for three additional units of the power part of thyristor power converters, for an additional amount of 249 681 Swiss francs, subject to revision for inflation from 1 August 2006, bringing the total amount to 1 231 165 Swiss francs. The firm has indicated the following distribution by country of the contract value covered by this adjudication propos...

  4. Proposal for the award of three contracts for the provision of temporary labour on the Swiss part of the CERN site

    CERN Document Server

    2002-01-01

    This document concerns the award of three contracts for the provision of temporary labour on the Swiss part of the CERN site. Following a market survey carried out among 71 firms in thirteen Member States, a call for tenders (IT-2875/HR) was sent on 11 July 2001 to nine firms and six consortia, one consisting of three firms, five consisting of two firms, in eight Member States. By the closing date, CERN had received 12 tenders from eight firms and four consortia in five Member States. The Finance Committee is invited to agree to the negotiation of three contracts for the provision of temporary labour on the Swiss part of the CERN site with CONSULTOR (PL), ADECCO (CH) and FLEX-FORCE (CH)/TEMP-TEAM (NO). The total maximum amount for all three contracts is, for an initial period of three years starting 1 July 2002, 5 500 000 Swiss francs, subject to revision for inflation from 1 January 2003. The contracts will include an option for two further one-year extensions beyond the initial three-year period. The firms ...

  5. 48 CFR 709.507-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 709.507-2... PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 709.507-2 Contract clause. (a)-(b... after award of a contract, the clause found at 752.209-71 shall be inserted in all contracts whenever...

  6. 48 CFR 342.7001 - Contract monitoring responsibilities.

    Science.gov (United States)

    2010-10-01

    ... administration. The Contracting Officer shall ensure that these individuals understand and carry out their... contracts. This is important for awards to new organizations or those with financial weaknesses. (d) The... include a statement of corrective actions that the Contracting Officer is taking. ...

  7. 48 CFR 49.108-5 - Recognition of judgments and arbitration awards.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-5 Recognition of... arbitration under any applicable law or contract provision, the TCO shall recognize the arbitration award as... contractor, the TCO shall, for the purposes of settling the prime contract, treat the amount of the judgment...

  8. Proposal for the award of a contract, without competitive tendering, for the supply of eight glass-coated beryllium mirrors for the LHCb RICH1 detector

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of eight glass-coated beryllium mirrors for the LHCb RICH1 detector. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, with the ISTC Moscow (RU) for the supply of eight glass-coated beryllium mirrors for a total amount of 282 000 US dollars, not subject to revision. At the present rate of exchange this is equivalent to approximately 370 000 Swiss francs. The contract will be financed by PPARC (GB) and CERN. PPARC will contribute 65 000 US dollars (approximately 85 000 Swiss francs) and CERN will contribute 217 000 US dollars (approximately 285 000 Swiss francs).

  9. 48 CFR 922.608-5 - Award.

    Science.gov (United States)

    2010-10-01

    ... APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITION Walsh-Healey Public Contracts Act 922.608-5 Award. The... Office in which the contractors place of business is located. Regional Office locations are specified at...

  10. Next Indefinite Contract review exercise

    CERN Multimedia

    HR Department

    2015-01-01

    Dear Colleagues, We are pleased to inform you that the 2015 LD2IC exercise (selection process for the conversion of limited-duration contracts into indefinite contracts) has been officially launched. The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 3 August 2015 for a period of four weeks (until 31 August 2015). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions (FAQ) and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: We would like to remind you that all staff members holding a limited-duration contract who have successfully completed their probation period at the time of application and who meet the eligibility criteria in the vacancy notices (VNs) are eligible to apply for posts for the award of a...

  11. AID awards 3-year Guatemala contract.

    Science.gov (United States)

    1984-01-01

    The US Agency for International Development (USAID) has awarded a 3-year US$593,036 grant to the Los Angeles firm of Juarez and Associates, Inc. to help implement a contraceptive social marketing project in Guatemala. The firm will provide marketing assistance to the for-profit organization. Importadora de Productos Farmaceuticos (PROFA), an offshoot of the nonprofit International Planned Parenthood Federation affiliate, Asociacion Pro-Bienestar de la Familia de Guatemala (APROFAM), created specifically to conduct the social marketing project. Juarez and Associates has previous market research experience in family planning in Guatemala. Contraceptive social marketing sales are projected to begin in early 1985.

  12. Socially Responsible Award of the Procurement Contracts

    OpenAIRE

    Hristina Blagoycehva

    2013-01-01

    With the Europe 2020 strategy the EU has set itself, under conditions of a changing world, the goal of becoming an intelligent, sustainable and inclusive economy. Under the current conditions of budget constraints and economic difficulties the conventional mechanisms for promoting social justice and social cohesion are insufficient. Through the inclusion of social criteria in the awarding of public procurement there can be guaranteed the compliance with social insurance legislation, furthered...

  13. Proposal for the award of a blanket contract for the supply, installation and maintenance of the LHC access control system

    CERN Document Server

    2004-01-01

    This document concerns the award of a blanket contract for the supply, installation and maintenance of the LHC access control system. Following a market survey carried out among 134 firms in fifteen Member States, a call for tenders (IT-3026/TS/LHC) was sent on 22 January 2004 to eight firms and eight consortia in six Member States. By the closing date, CERN had received nine tenders from two firms and seven consortia in five Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with the consortium CEGELEC CENTRE EST (FR) - CEGELEC (NL), the lowest technically compliant bidder, for the supply, installation and maintenance of the LHC access control system for a total amount not exceeding 4 600 000 euros (7 141 000 Swiss francs), subject to revision for inflation from 1 January 2007. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - ...

  14. Proposal for the award of a contract for the assembly on the CERN site of interconnections for the LHC machine

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the assembly on the CERN site of interconnections for the LHC machine. Following a market survey carried out among 70 firms in fourteen Member States, a call for tenders (IT-3099/AT/LHC) was sent on 14 April 2003 to one firm and four consortia in five Member States. By the closing date, CERN had received three tenders from three consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium INEO (FR), ENDEL (FR) and GTI (NL), the lowest bidder, for the assembly on the CERN site of interconnections for the LHC machine for a total amount of 6 792 836 euros (10 475 917 Swiss francs), subject to revision for inflation after 1 January 2006. The rate of exchange used is that stipulated in the tender. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: NL - 51%; FR - 49%.

  15. Proposal for the award of two contracts for the provision of mechanical design and draughting services on and off the CERN Site

    CERN Document Server

    2006-01-01

    This document concerns the award of two contracts for the provision of mechanical design and draughting services on and off the CERN site. The Finance Committee is invited to agree to the negotiation of two contracts with: 1. ACROTECNA (FR), the lowest bidder, for approximately 55% of the provision of mechanical design and draughting services on and off the CERN site, for a period of three years for a total amount not exceeding 794 200 euros (1 239 006 Swiss francs), not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The rate of exchange used is that stipulated in the tender. 2. TECNICAS AERONAUTICAS MADRID (ES), the joint lowest bidder after alignment, for approximately 45% of the provision of mechanical design and draughting services on and off the CERN site, for a period of three years for a total amount not exceeding 1 013 730 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond...

  16. NASA/University Joint Venture (JOVE) Program

    Science.gov (United States)

    Magee-Sauer, Karen P.

    1999-01-01

    Hale-Bopp observations at the NASA IRTF concluded in September 1997. For the post Hale-Bopp period, telescope time was awarded to study comet Giacobini-Zinner in October 1998 at the NASA IRTF. A total of 6 nights were awarded to our team to study the comet where 2 of those 6 nights were awarded to Magee-Sauer as the principal investigator. Other observing trips were awarded to study YSOs (October 1998) and Mars (spring 1999) were Magee-Sauer was a co-investigator. An observing run from July 4 -7 1999 included study of Mars and YSOS. Our group has started to use the NIRSPEC instrument on the Keck II telescope. In collaboration with the development team from UCLA, we obtained images of comet Lee in August 1999. Telescope proposals are submitted each semester for targeted comet observations when a comet is bright enough to observe.

  17. 78 FR 37676 - Federal Acquisition Regulation; System for Award Management Name Change, Phase 1 Implementation

    Science.gov (United States)

    2013-06-21

    ... Services Administration (GSA)-- (1) Operates the web-based System for Award Management (SAM) Exclusions... System for Award Management (SAM) database for contracts awarded to support unusual and compelling needs... Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as...

  18. Proposal for the award of a blanket purchase contract for the design, supply, installation and maintenance of automatic fire-detection, fire-protection and voice-alarm systems for the Super Proton Synchrotron

    CERN Document Server

    2017-01-01

    Proposal for the award of a blanket purchase contract for the design, supply, installation and maintenance of automatic fire-detection, fire-protection and voice-alarm systems for the Super Proton Synchrotron

  19. Further Improvements Needed in Navy’s Oversight and Management of Contracting for Facilities Construction on Diego Garcia.

    Science.gov (United States)

    1984-05-23

    1981, the Navy awarded a cost reimbursable contract to a joint venture to construct facility projects for fiscal years 1981 and 1982 with an estimated...through fiscal year 1986. In July 1981, the Navy awarded a cost reimburs - able contract (cost plus award fee) to Raymond, Brown & Root, Molem, a joint...Navy’s oversight and management of the acquisition of these facilities. A COST REIMBURSABLE CONTRACT MAKES STRONG CONTRACT ADMINISTRATION VITAL Under

  20. 46 CFR Sec. 5 - Procedure for negotiated price awards.

    Science.gov (United States)

    2010-10-01

    ... shall be furnished with the information provided for in Article 1(a) of the NSA-LUMPSUMREP Contract. (b... Article 27 of the NSA-LUMPSUMREP Contract. ... 46 Shipping 8 2010-10-01 2010-10-01 false Procedure for negotiated price awards. Sec. 5 Section 5...

  1. 48 CFR 2452.216-70 - Estimated cost, base fee and award fee.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost, base fee... Provisions and Clauses 2452.216-70 Estimated cost, base fee and award fee. As prescribed in 2416.406(e)(1), insert the following clause in all cost-plus-award-fee contracts: Estimated Cost, Base Fee and Award Fee...

  2. Proposal for the award of a blanket order contract for the supply of microprocessor-based protection and control devices for the CERN HV distribution network

    CERN Document Server

    2004-01-01

    This document concerns the award of a blanket contract for the supply of microprocessor-based protection and control devices for the CERN HV distribution network. The Finance Committee is invited to agree to the negotiation of a blanket order contract with SCHNEIDER ELECTRIC (PT), the lowest technically acceptable bidder after realignment, for the supply of microprocessor-based protection and control devices for the CERN HV distribution network for a total amount of 1 900 000 euros (2 924 128 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender

  3. Proposal for the award of a contract for the supply and installation of prefabricated reinforced-concrete modules for an LHC access shaft

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply and installation of 33 prefabricated reinforced-concrete modules for the PX15 access shaft. Following a market survey carried out among 39 firms in fourteen Member States, a call for tenders (IT-2714/ST/LHC) was sent on 22 May 2000 to seven firms and one consortium consisting of four firms in seven Member States. By the closing date, CERN had received five tenders from four firms and one consortium in five Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium JOINT VENTURE CCC (CH-DE-AT), the lowest bidder after realignment, for the supply and installation of prefabricated reinforced-concrete modules for the PX15 access shaft for a total amount of 988 915 Swiss francs, not subject to revision. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE-89%; CH-6%; AT-5%.

  4. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  5. 48 CFR 1819.7302 - NASA contract clauses.

    Science.gov (United States)

    2010-10-01

    ... to Public Law 97-219 (the Small Business Innovation Development Act of 1982). (b) Contracting... pursuant to Public Law 97-219 (the Small Business Innovation Development Act of 1982). (c) Contracting... Law 97-219 (the Small Business Innovation Development Act of 1982). (d) Contracting officers shall...

  6. ORGANIZATIONAL CONFLICT OF INTEREST AND THE AIR FORCE CONTRACT AUGMENTATION PROGRAM: A PATTERNED APPROACH TO RISK IDENTIFICATION

    Science.gov (United States)

    2016-04-22

    eight contractors. It is a multiple - award indefinite-delivery, indefinite quantity (IDIQ) $5 billion arrangement with one base year and four option...evaluation factors, and the pre-award phase is completed. The post-award phase concerns the insurance of performance under the terms of the contract...may have consequences ranging from award fee decrements , contract termination, suspension or debarment, or other appropriate remedies or

  7. 48 CFR 538.270 - Evaluation of multiple award schedule (MAS) offers.

    Science.gov (United States)

    2010-10-01

    ... SERVICES ADMINISTRATION SPECIAL CATEGORIES OF CONTRACTING FEDERAL SUPPLY SCHEDULE CONTRACTING Establishing and Administering Federal Supply Schedules 538.270 Evaluation of multiple award schedule (MAS) offers... determining the Government's price negotiation objectives, consider the following factors: (1) Aggregate...

  8. Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating, Ventilation and Air-Conditioning (HVAC) system for the computer room of the CERN Control Centre

    CERN Document Server

    2012-01-01

    Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating, Ventilation and Air-Conditioning (HVAC) system for the computer room of the CERN Control Centre

  9. Proposal for the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (NL) â?" SEMER (FR), the lowest bidder, for the supply, installation, commissioning and maintenance for five years of the LHC access safety system for a total amount of 891 423 euros (1 367 633 Swiss francs), subject to revision for inflation for the maintenance of the system from 1 January 2007, with an option for the supply of safety PLCs for a total amount of 894 951 euros (1 373 046 Swiss francs), not subject to revision, bringing the total amount to 1 786 374 euros (2 740 679 CHF).The rate of exchange used is that stipulated in the tender.

  10. Proposal for the award of a contract for the supply of LHC dipole thermal shield bottom tray assemblies

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of 1 250 LHC dipole thermal shield bottom tray assemblies. Following a market survey carried out among 95 firms in sixteen Member States, a call for tenders (IT-2650/LHC/LHC) was sent on 8 November 1999 to eight firms in six Member States. By the closing date, CERN had received four tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm EISENWERKE KAISERSLAUTERN (DE), the lowest bidder, for the supply of 1 250 LHC dipole thermal shield bottom tray assemblies for a total amount of 6 150 808 euros (9 858 518 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of up to 150 additional thermal shield bottom tray assemblies, for a total amount of 696 979 euros (1 117 118 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, bringing the total amount to a maximum of 6 847 787 euros (10 975 636 Swiss francs), subject to...

  11. Proposal for the award of two contracts for the supply of bellows expansion joints for LHC cryomagnet interconnections

    CERN Document Server

    2000-01-01

    This document concerns the award of two contracts for the supply of bellows expansion joints for LHC cryomagnet interconnections. Following a market survey carried out among 39 firms in eight Member States, a call for tenders (IT-2630/LHC/LHC) was sent on 31 May 2000 to 14 firms in five Member States. By the closing date, CERN had received tenders from five firms in four Member States. The Finance Committee is invited to agree to the negotiation of: - a contract with HANS SKODOCK (DE), the lowest bidder, for the supply of two packages of bellows expansion joints, namely the U-type package and the nested bellows package for a total amount of 2 796 785 euros (4 353 650 Swiss francs), not subject to revision, with options for 20% extra bellows expansion joints for an additional amount of 559 357 euros (870 730 Swiss francs), not subject to revision, bringing the total amount to 3 356 142 euros (5 224 380 Swiss francs), not subject to revision. The rates of exchange which have been used are those stipulated in th...

  12. Proposal for the award of a contract for the supply of the MQY-type superconducting quadrupole magnets for the LHC insertions

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of the 22 twin-aperture MQY-type superconducting quadrupole magnets for the LHC insertions. Following a market survey (MS-2455/LHC/LHC) carried out among 21 firms in ten Member States and one firm in Japan, a call for tenders (IT-2750/LHC/LHC) was sent on 25 May 2000 to six firms and one consortium consisting of two firms in five Member States. By the closing date, CERN had received four tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm ACCEL INSTRUMENTS (DE), the lowest bidder, for the supply of the 22 MQY-type superconducting quadrupole magnets for the LHC insertions for a total amount of 4 372 950 Deutschmarks (3 488 603 Swiss francs), subject to revision for contractual deliveries after 31 December 2002, with an option for the supply of up to 5 additional MQY-type superconducting quadrupole magnets, for a total amount of 993 850 Deutschmarks (792 863 Swiss francs), subject to revision for contract...

  13. Proposal for the award of an industrial services contract for electrical installation work and maintenance of lighting and low-voltage distribution

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for electrical installation work and maintenance of lighting and low-voltage distribution. Following a market survey carried out among 127 firms in fifteen Member States, a call for tenders (IT-2754/ST) was sent on 2 June 2000 to three firms and four consortia, each consisting of two firms, in four Member States. By the closing date, CERN had received tenders from two firms and two consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE TRINDEL(FR) ? CONTROLMATIC (DE), the lowest bidder complying with the specified requirements, for an initial period of three years from 1 July 2001 for a total amount of 41 705 497 Swiss francs, not subject to revision until 31 December 2003. The contract will include options for two one-year extensions beyond the initial three-year period for a total amount of 27 803 664 Swiss francs, for which CERN will seek approval by the Finance ...

  14. Proposal for the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC. Following a market survey carried out among 53 firms in twelve Member States, a call for tenders (IT-3091/TIS/LHC) was sent on 17 July 2003 to seven firms and five consortia in eight Member States. By the closing date, CERN had received seven tenders from one firm and six consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ASSYSTEM INDUSTRIAL SERVICES (FR) - GENITRON INSTRUMENTS (DE), the lowest bidder, for the supply, installation and maintenance of radiation and environmental monitoring for the LHC for a total amount not exceeding 5 474 000 euros (8 457 000 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender. The consortium has indicated the following distribution by country of the contract value covered by this ...

  15. Proposal for the award of a blanket contract for the supply and installation of automatic fire-detection and emergency-evacuation equipment

    CERN Document Server

    2003-01-01

    This document concerns the award of a blanket contract for the supply and installation of automatic fire-detection and emergency-evacuation equipment. Following a market survey carried out among 54 firms in ten Member States, a call for tenders (IT-3090/ST) was sent on 29 August 2003 to one firm and four consortia in five Member States. By the closing date, CERN had received four tenders from four consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with the consortium HEKATRON (DE) - SOTEB (FR), the lowest bidder, for the supply and installation of automatic fire-detection and emergency-evacuation equipment for a total amount not exceeding 1 900 000 euros (2 946 650 Swiss francs), subject to revision for inflation from 1 January 2007. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 70%; FR - 30%.

  16. 48 CFR 1816.307-70 - NASA contract clauses.

    Science.gov (United States)

    2010-10-01

    ... officer may insert a clause substantially as stated at 1852.216-87, Submission of Vouchers for Payment, in... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 1816.307-70... clause at 1852.216-75, Payment of Fixed Fee, in cost-plus-fixed-fee contracts. Modifications to the...

  17. Reconfiguration of NASA GRC's Vacuum Facility 6 for Testing of Advanced Electric Propulsion System (AEPS) Hardware

    Science.gov (United States)

    Peterson, Peter Y.; Kamhawi, Hani; Huang, Wensheng; Yim, John T.; Haag, Thomas W.; Mackey, Jonathan A.; McVetta, Michael S.; Sorrelle, Luke T.; Tomsik, Thomas M.; Gilligan, Ryan P.; hide

    2018-01-01

    The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5 kW Hall thruster has been the subject of extensive technology maturation in preparation for development into a flight propulsion system. The HERMeS thruster is being developed and tested at NASA GRC and NASA JPL through support of the Space Technology Mission Directorate (STMD) and is intended to be used as the electric propulsion system on the Power and Propulsion Element (PPE) of the recently announced Deep Space Gateway (DSG). The Advanced Electric Propulsion System (AEPS) contract was awarded to Aerojet-Rocketdyne to develop the HERMeS system into a flight system for use by NASA. To address the hardware test needs of the AEPS project, NASA GRC launched an effort to reconfigure Vacuum Facility 6 (VF-6) for high-power electric propulsion testing including upgrades and reconfigurations necessary to conduct performance, plasma plume, and system level integration testing. Results of the verification and validation testing with HERMeS Technology Demonstration Unit (TDU)-1 and TDU-3 Hall thrusters are also included.

  18. Proposal for the award of a contract for provision of on-site welding inspections for the LHC

    CERN Document Server

    European Organization for Nuclear Research

    2004-01-01

    This document concerns the award of a contract for the provision of on-site welding inspections for the LHC magnets and their interconnections. Following a market survey MS-3207/TIS carried out among 82 firms in twelve Member States, a call for tenders (IT-3276/AT/LHC) was sent on 27 January 2004 to twelve firms, in seven Member States. By the closing date, CERN had received five tenders from four firms and one consortium in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with IS SERVICES (FR), the lowest bidder for the provision of on-site welding inspections for the LHC for a total amount not exceeding 710 197 euros (1 121 543 Swiss francs) covering a period of three years starting on 1 July 2004 with an option for additional work for an amount of 89 677 euros (141 619 Swiss francs) bringing the total amount to 799 874 euros (1 263 162 Swiss francs) not subject to revision. The rate of exchange used is that stipulated in the tender. The firm has indicated the ...

  19. 14 CFR 1245.102 - Definitions and terms.

    Science.gov (United States)

    2010-01-01

    ... subpart: (a) Contract means any actual or proposed contract, agreement, understanding, or other arrangement with the National Aeronautics and Space Administration (NASA) or another Government agency on NASA... thereunder, and including NASA grants awarded under the authority of 42 U.S.C. 1891-1893. (b) Contractor...

  20. 46 CFR Sec. 2 - Description of NSA-WORKSMALREP Contract.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Description of NSA-WORKSMALREP Contract. Sec. 2 Section... REPAIRS-NSA-WORKSMALREP Sec. 2 Description of NSA-WORKSMALREP Contract. This is an individual fixed price contract which may be awarded to any firm not holding an NSA-LUMPSUMREP Contract, as a result of formal...

  1. Proposal for the award of a contract, without competitive tendering, for the supply of radiation-tolerant anti-fuse FPGAs for the LHC

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of 14 800 radiation-tolerant anti-fuse Field Programmable Gate Arrays (FPGAs) for the LHC. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of a contract with MEMEC (CH), for the supply of 14 800 anti-fuse FPGAs for a total amount of 574 330 US dollars (654 900 Swiss francs), not subject to revision, with an option for up to 2960 additional anti-fuse FPGAs for an amount not exceeding 114 866 US dollars (130 980 Swiss francs) bringing the total amount to 689 196 US dollars (758 880 Swiss francs) not subject to revision. The amounts in Swiss francs have been calculated using the present rate of exchange.

  2. Proposal for the award of two contracts for the maintenance of green areas and roads on the CERN site

    CERN Document Server

    2006-01-01

    This document concerns the award of two contracts for the maintenance of green areas and roads, i) on the CERN site of Meyrin, LHC Point 1 and SPS Points BA5 and BA6 and ii) on the CERN site of Prévessin, all the LHC Points except Point 1 and all the SPS Points except Points BA5 and BA6. The Finance Committee is invited to agree to the negotiation of contracts with: - PAYSAGE CONCEPT (FR), the lowest bidder, for the maintenance of green areas and roads on the CERN's Meyrin site, LHC Point 1 and SPS Points BA5 and BA6 for two years for a total amount of 903 532 Swiss francs, not subject to revision until 30 June 2008. - WIESMANN (FR), the lowest bidder, for the maintenance of green areas and roads on the CERN's Prévessin site, all the LHC Points except Point 1 and all the SPS Points except Points BA5 and BA6 for two years for a total amount of 671 529 Swiss francs, not subject to revision until 30 June 2008. Both contracts will include options for three one-year extensions beyond the initial two-year period....

  3. 25 CFR 900.229 - What role will the awarding official play during an appeal?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What role will the awarding official play during an appeal? 900.229 Section 900.229 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR, AND INDIAN... EDUCATION ASSISTANCE ACT Post-Award Contract Disputes § 900.229 What role will the awarding official play...

  4. 48 CFR 836.209 - Construction contracts with architect-engineer firms.

    Science.gov (United States)

    2010-10-01

    ... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...

  5. 48 CFR 9.507-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.507-2 Contract clause. (a) If..., for example, when the first production contract using the contractor's specifications or work statement is awarded, or it might extend through the entire life of a system for which the contractor has...

  6. 48 CFR 229.402-1 - Foreign fixed-price contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Foreign fixed-price... Foreign fixed-price contracts. Use the clause at 252.229-7000, Invoices Exclusive of Taxes or Duties, in solicitations and contracts when a fixed-price contract will be awarded to a foreign concern. ...

  7. 48 CFR 52.214-10 - Contract Award-Sealed Bidding.

    Science.gov (United States)

    2010-10-01

    ... the solicitation, will be most advantageous to the Government considering only price and the price... quantity less than the quantity offered, at the unit prices offered, unless the bidder specifies otherwise in the bid. (d) A written award or acceptance of a bid mailed or otherwise furnished to the...

  8. Proposal for the Award of Two Contracts for the Supply of High Temperature SuperconductingTape for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of two contracts for the supply of high temperature superconducting (HTS) BSCCO 2223 Ag-Au tape, of two different types, for the LHC. Following a call for tenders (IT-3143/AT/LHC) sent on 5 March 2003 to four firms in two Member States and one firm in the US, CERN received one tender from a firm in a Member State and one tender from the firm in the United States. The Finance Committee is invited to agree to the negotiation of contracts with: - VACUUMSCHMELZE (DE), for the supply of 17 km of HTS BSCCO 2223 Ag-Au tape with Ic > 66 A at 77 K for a total amount of 807 833 euros (1 201 900 Swiss francs), not subject to revision, with an option for the supply of up to additional 17 km of HTS BSCCO 2223 Ag-Au tape, for a total amount of up to 807 833 euros (1 201 900 Swiss francs), not subject to revision, bringing the total amount to a maximum of 1 615 666 euros (2 403 800 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender.

  9. Proposal for the award of a contract without competitive tendering for the supply of coaxial high-voltage cable for the LHC beam dumping system

    CERN Document Server

    2002-01-01

    This document concerns the award of a contract without competitive tendering for the supply of two types of coaxial high-voltage cable for the LHC beam dumping system. Following a market survey carried out among 14 firms in four Member States, a call for tenders (IT-2969/SL/LHC) was sent on 10 July 2001 to one firm. By the closing date, CERN had received one tender. The Finance Committee is invited to agree to the negotiation of a contract with DRAKA MULTIMEDIA CABLE (DE), the only bidder, for the supply of 14 km of coaxial high-voltage cable for the LHC beam dumping system for a total amount of 530 488 euros (779 900 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 100%.

  10. Proposal for the Award of Two Contracts for the Technical Services for Work on Components of CERN Particle Accelerators and High Energy Physics Experiments

    CERN Document Server

    2003-01-01

    This document concerns the award of two contracts for the technical services for work on components of CERN particle accelerators and high energy physics experiments. Following a market survey carried out among 73 firms in fourteen Member States, a call for tenders (IT-3156/SPL) was sent on 4 November 2002 to three consortia in four Member States. By the closing date, CERN had received tenders from the three consortia. The Finance Committee is invited to agree to the negotiation of two contracts with: 1) the consortium SERCO FACILITIES MANAGEMENT (NL) - GERARD PERRIER INDUSTRIE (FR) - INEO ALPES (FR), the lowest bidder, for approximately 55% of the technical services for work on components of CERN particle accelerators and high energy physics experiments, for an initial period of five years and for a total amount not exceeding 37 435 270 euros (54 902 500 Swiss francs), subject to revision for inflation from 1 January 2005. The contract will include options for two one-year extensions beyond the initial five-...

  11. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  12. 75 FR 2109 - Notice of Availability of Final Contracting Policy

    Science.gov (United States)

    2010-01-14

    ...-sector companies available to State and local government entities that have a need for the services... will continue to examine ways to improve its contracting processes, including minimizing the turnover frequency of contracting personnel and reducing the length of time required to award contracts and task...

  13. 32 CFR 3.9 - Follow-on production contracts.

    Science.gov (United States)

    2010-07-01

    ...) Use competition to select parties for participation in the OT prototype agreement and evaluate the... THAN CONTRACTS, GRANTS, OR COOPERATIVE AGREEMENTS FOR PROTOTYPE PROJECTS § 3.9 Follow-on production contracts. (a) Authority. A competitively awarded OT agreement for a prototype project that satisfies the...

  14. 76 FR 31998 - Posting of Service Contract Inventory

    Science.gov (United States)

    2011-06-02

    ... OFFICE OF PERSONNEL MANAGEMENT Posting of Service Contract Inventory AGENCY: Office of Personnel... Web site an inventory of the services contracts exceeding $25,000 that were awarded by the agency in... 2010 Consolidated Appropriations Act, Public Law 111-117, and with a Memorandum from the Office of...

  15. Proposal for the award of a contract, without competitive tendering, for the supply of two cabling machines for the manufacture of superconducting cable for the LHC main magnets

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of two cabling machines for the production of superconducting cable for the LHC main magnets. These cables are of two different types, hereafter referred as Cable 1 and Cable 2. For the reasons set out in this document, the Finance Committee is invited to agree to the negotiation of a contract with SETIC (FR) for the supply of two cabling machines, for a total amount not exceeding 3 200 000 euros (4 948 800 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  16. Proposal for the award of a contract for the supply and installation of a pumping unit for gaseous helium

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply and installation of a pumping unit for gaseous helium. Following a market survey carried out among 17 firms in seven Member States, a call for tenders (IT-2930/LHC/LHC) was sent on 26 April 2001 to four firms in four Member States. By the closing date, CERN had received tenders from all firms. The Finance Committee is invited to agree to the negotiation of a contract with LEYBOLD (CH), the lowest bidder, for the supply and installation of a pumping unit for gaseous helium for a total amount of 716 600 euros (1 099 264 Swiss francs), not subject to revision, with an option for one additional pumping unit, for an additional amount of 704 000 euros (1 079 936 Swiss francs), not subject to revision, bringing the total amount to 1 420 600 euros (2 179 200 Swiss francs), not subject to revision. The above amounts in Swiss francs have been calculated using the rate of exchange applicable at the closing date of the call for tenders. The firm has indicated ...

  17. Maintaining a Viable Energy Savings Performance Contract

    National Research Council Canada - National Science Library

    Weber, Katherine L; Huckeby, Michael A

    2005-01-01

    Substantial amounts of information are available on Energy Savings Performance Contract award requirements, measurement, and verification, but we have found very little information on the day-to-day...

  18. 48 CFR 1552.242-72 - Financial administrative contracting officer.

    Science.gov (United States)

    2010-10-01

    ... Administrative Contracting Officer (FACO) is responsible for performing certain post-award functions related to the financial aspects of this contract when the EPA is the cognizant federal agency. These functions...) Negotiate advance agreements applicable to treatment of costs and to Independent Research & Development/Bid...

  19. 45 CFR 2543.84 - Contract Work Hours and Safety Standards Act.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Contract Work Hours and Safety Standards Act. 2543... OTHER NON-PROFIT ORGANIZATIONS Statutory Compliance § 2543.84 Contract Work Hours and Safety Standards Act. Where applicable, all contracts awarded by recipients in excess of $2000 for construction...

  20. Status of NASA's Advanced Radioisotope Power Conversion Technology Research and Development

    Science.gov (United States)

    Wong, Wayne A.; Anderson, David J.; Tuttle, Karen L.; Tew, Roy C.

    2006-01-01

    NASA s Advanced Radioisotope Power Systems (RPS) development program is funding the advancement of next generation power conversion technologies that will enable future missions that have requirements that can not be met by either the ubiquitous photovoltaic systems or by current Radioisotope Power Systems (RPS). Requirements of advanced radioisotope power systems include high efficiency and high specific power (watts/kilogram) in order to meet mission requirements with less radioisotope fuel and lower mass. Other Advanced RPS development goals include long-life, reliability, and scalability so that these systems can meet requirements for a variety of future space applications including continual operation surface missions, outer-planetary missions, and solar probe. This paper provides an update on the Radioisotope Power Conversion Technology Project which awarded ten Phase I contracts for research and development of a variety of power conversion technologies consisting of Brayton, Stirling, thermoelectrics, and thermophotovoltaics. Three of the contracts continue during the current Phase II in the areas of thermoelectric and Stirling power conversion. The accomplishments to date of the contractors, project plans, and status will be summarized.

  1. New staff contract policy

    CERN Document Server

    HR Department

    2006-01-01

    Following discussion at TREF and on the recommendation of the Finance Committee, Council approved a new staff contract policy, which became effective on 1 January 2006. Its application is covered by a new Administrative Circular No. 2 (Rev. 3) 'Recruitment, appointment and possible developments regarding the contractual position of staff members'. The revised circular replaces the previous Circulars No. 9 (Rev. 3) 'Staff contracts' and No. 2 (Rev. 2) 'Guidelines and procedures concerning recruitment and probation period for staff members'. The main features of the new contract policy are as follows: The new policy provides chances for long-term employment for all staff recruits staying for four years without distinguishing between those assigned to long-term or short-term activities when joining CERN. In addition, it presents a number of simplifications for the award of ICs. There are henceforth only 2 types of contract: Limited Duration (LD) contracts for all recruitment and Indefinite Contracts (IC) for...

  2. Proposal for the award of an industrial services contract for the operation and maintenance of the CERN electrical network and the inspection and supervision of the electrical installation work

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of two cabling machines for the production of superconducting cable for the LHC main magnets. These cables are of two different types, hereafter referred as Cable 1 and Cable 2. For the reasons set out in this document, the Finance Committee is invited to agree to the negotiation of a contract with SETIC (FR) for the supply of two cabling machines, for a total amount not exceeding 3 200 000 euros (4 948 800 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  3. Proposal for the award of a contract for the supply of glass-fibre reinforced epoxy support posts for the LHC cryomagnets

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of glass-fibre reinforced epoxy support posts for the LHC cryomagnets. Following a market survey carried out among 114 firms in sixteen Member States, a call for tenders (IT-2596/LHC/LHC) was sent on 14 August 2000 to 11 firms and a consortium consisting of two firms, in seven Member States. By the closing date, CERN had received four tenders from three firms and a consortium, in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with EADS CASA ESPACIO (ES), the lowest bidder complying with the specifications, for the supply of 3750 cryodipole and 872 short straight section support posts for a total amount of 6 455 739 euros (9 747 454 Swiss francs), not subject to revision until 1 January 2003, with options for up to 300 support posts of each type, for an additional amount of 637 000 euros (961 800 Swiss francs), not subject to revision until 1 January 2003, bringing the total amount to 7 092 738 euros ...

  4. 76 FR 6696 - NASA Implementation of Federal Acquisition Regulation (FAR) Award Fee Language Revision

    Science.gov (United States)

    2011-02-08

    ... of Federal Acquisition Regulation (FAR) Award Fee Language Revision AGENCY: National Aeronautics and... (NFS) to implement the FAR Award Fee revision issued in Federal Acquisition Circular (FAC) 2005-46.... Background Federal Acquisition Circular (FAC) 2005-46 significantly revised FAR Parts 16.305, 16.401, and 16...

  5. Geographic List of Prime Contract Awards. Oct 1992-Sep 1993. FY 1993. (Alachua, Florida-DeKalb, Georgia). Part 4

    Science.gov (United States)

    1994-03-01

    CONTRACT AWARDS. OCT 92- SEP 93. FY93. (ALACHUA, FLORIDA - De KALB - GEORGIA 0. iDEPARTIENT OF DEFENSE WASHINGTON HEADQUARTERS SERVICES DIRECTORATE FOR...ý aý NO ND I) I 00N 1mo LL enC )-CR In - Nf ’COO NC N L LL 5D Cy 1 .P % 4 rl LA M ) L cacaoe R OD CyL. -I 0 I gl~ o N (a t -1 n --.- w 4 -a- 4ý41...lo000 N CNN N N N NN N W N W W WN O0WN ONj CaNNN NW NNC NIB - 1 000* NA I.-4000000CV--0OVO 0 uLO cLO in LL. W-4 .4-4 -I4 .4-4 N 0100 NI 4N-I0t1.4W-I

  6. 76 FR 54242 - Agency Information Collection Activities: Post-Award Contract Information

    Science.gov (United States)

    2011-08-31

    ... Governmentwide implementation of e-Government initiatives, it is commonplace within many of DHS's Components for... documentation, Government estimate of contract price, contract modifications, Small Business Administration... information requested is used by the Government's contracting officers and other acquisition personnel...

  7. Listing of awardee names: Active awards as of October 5, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-05

    This is a listing of awarded active contracts for all US DOE facilities and projects. The information contained in the list includes the awardee name and division responsible for the work, BIN, completion date, a one line description of the work, the vendor ID, city, state, congressional district, the value of the contract and the amount of funds expended to date.

  8. 42 CFR 67.103 - Peer review of contract proposals.

    Science.gov (United States)

    2010-10-01

    ... specific health care issues; and (5) Appropriate representation based on gender, racial/ethnic origin, and... the contract(s) awarded as a result of the peer review. (e) Conflict of interest. (1) Members of peer review groups will be screened for potential conflicts of interest prior to appointment and will be...

  9. Proposal for the award of a contract for the supply of low-carbon steel sheets for the mqw quadrupole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of 1000 tonnes of low-carbon steel sheets for the MQW quadrupole magnets. Following a market survey carried out among 53 firms in 16 Member States, a call for tenders (IT-2619/SL/LHC) was sent on 24 September 1999 to three firms in two Member States. By the closing date, CERN had received two tenders. The Finance Committee is invited to agree to the negotiation of a contract with COCKERILL-SAMBRE (BE) for the supply of 1000 tonnes of low-carbon steel sheets for the MQW quadrupole magnets for a total amount of 894 780 euros (1 423 870 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of up to 200 tonnes of additional low-carbon steel sheets, for a total amount of 178 956 euros (284 774 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, bringing the total amount to a maximum of 1 073 736 euros (1 708 644 Swiss francs). The above amounts in Swiss franc...

  10. Proposal for the award of a contract for the supply of ceramic vacuum chambers for the LHC beam dumping system

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of ceramic vacuum chambers for the LHC beam dumping system. Following a market survey carried out among 22 firms in seven Member States and one firm in the United States, a call for tenders (IT-2765/SL/LHC) was sent on 13 September 2001 to one firm. By the closing date, CERN had received a tender. The Finance Committee is invited to agree to the negotiation of a contract with KYOCERA FINECERAMICS (DE) for the supply of 36 ceramic vacuum chambers for the LHC beam dumping system for a total amount of 681 530 euros (1 013 094 Swiss francs), not subject to revision, with options for six additional vacuum chambers, for an additional amount of 146 768 euros (218 171 Swiss francs), not subject to revision, bringing the total amount to 828 298 euros (1 231 265 Swiss francs), not subject to revision. The rate of exchange which has been used is that applying on the closing date of the call for tenders. The firm has indicated the following distribution by cou...

  11. Proposal for the award of a contract for the supply of low-carbon steel sheets for LHC resistive dipole magnets

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of 1 106 tonnes of low-carbon steel sheets for the MBW, MBXW and MCBW resistive dipole magnets for the LHC. Following a market survey (MS-2619/SL/LHC) carried out among 62 firms in sixteen Member States, a call for tenders (IT-2911/SL/LHC) was sent on 6 March 2001 to 11 firms in seven Member States. By the closing date, CERN had received one tender. The Finance Committee is invited to agree to the negotiation of a contract with the firm COCKERILL SAMBRE (BE), the only bidder, for the supply of 1 106 tonnes of low-carbon steel sheets for the MBW, MBXW and MCBW resistive dipole magnets for a total amount of 984 803 euros (1 511 328 Swiss francs), not subject to revision until 1 January 2003, with an option for the supply of up to 15% additional steel sheets, for a total amount of 147 720 euros (226 699 Swiss francs), not subject to revision until 1 January 2003, bringing the total amount to a maximum of 1 132 523 euros (1 738 027 Swiss francs), not s...

  12. Contract Attorneys Course Deskbook. Volume 2

    Science.gov (United States)

    2007-06-21

    Fed. Cir. 1994) (upholding the contractor’s submission of a subcontractor’s claim pursuant to a court order). 24-16 d. No claim vs . Defective...Non-DOD contract vehicles (orders placed by DOD and contracts awarded or orders placed by non-DOD entities on behalf of DOD, including franchise ...the federal agencies concerning who took what rights in a patent. Some agencies took title to the patent, while others left ownership with the

  13. 48 CFR 2913.106-3 - Soliciting competition, evaluation of quotations or offers, award and documentation.

    Science.gov (United States)

    2010-10-01

    ..., evaluation of quotations or offers, award and documentation. 2913.106-3 Section 2913.106-3 Federal... Procedures 2913.106-3 Soliciting competition, evaluation of quotations or offers, award and documentation. In... responsive quotation from a responsible supplier is used as the basis for a purchase, the contracting officer...

  14. Proposal for the award of an industrial support contract for the maintenance of and work on tertiary buildings at CERN, and operation of their installations

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for maintenance of and work on tertiary (i.e. non-accelerator) buildings and operation of their installations. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (CH) â?" G.T.M. (FR), the lowest bidder complying with the specification, for the provision of the maintenance of and work on tertiary buildings at CERN, and operation of their installations, for three years for a total amount not exceeding 9 346 650 euros (14 379 454 Swiss francs), not subject to revision until 1st January 2009, with options for additional services for an amount not exceeding 457 600 euros (704 000 Swiss francs), not subject to revision until 1st January 2009, bringing the total to an amount not exceeding 9 804 250 euros (15 083 454 Swiss francs), not subject to revision until 1st January 2009. The contract will include options for two one-year extensions beyond the initial three-year period.

  15. INDEFINITE CONTRACT REVIEW 2000

    CERN Multimedia

    Division des ressources humaines

    2000-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen:1.\tCandidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2.\tThe criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following:staff members who are in their fourth year of service on a fixed-term contract;in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consid...

  16. INDEFINITE CONTRACT REVIEW 2001

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen: 1. Candidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2. The criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following: staff members who are in their fourth year of service on a fixed-term contract; in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consideration fo...

  17. Forthcoming indefinite contract review procedure

    CERN Document Server

    HR Department

    2011-01-01

    The vacancy notices for posts opened with a view to the award of an indefinite contract will be published as from the last week of September.  In the meantime, the list of posts to be opened is available at the following address: https://hr-recruit.web.cern.ch/hr-recruit/staff/Autumn_2011_listofslots.pdf Information sessions for candidates are being organised for 26 and 27 September 2011. For more information please consult:  https://hr-recruit.web.cern.ch/hr-recruit/staff/IndefiniteContracts.asp

  18. Lessons learned : pavement marking warranty contract.

    Science.gov (United States)

    2013-12-01

    In 2012, UDOT implemented a performance-based warranty on a portion of an I-15 pavement marking : project. The awarded contract requested a contractor warranty on the implemented markings for a total : duration of six years. This is the first time th...

  19. Single- and Multi-Prime Contracting in North Carolina Public Construction.

    Science.gov (United States)

    Bluestein, Frayda S.

    1995-01-01

    The North Carolina General Assembly directed the State Building Commission to study the comparative costs of multi- and single-prime contracting and report the results to the 1995 General Assembly. Describes the analysis of data collected from governmental units that had awarded construction contracts. Identifies some alternative contracting…

  20. An unsatisfactory contract policy

    CERN Multimedia

    Association du personnel

    2012-01-01

    For the last 15 years contract policy has been one of the top priorities of CERN staff, as expressed in successive surveys initiated by the Staff Association. In one’s professional life, having some forward vision of one’s career prospects is the key to loyalty and motivation. On the contrary, instability about the future is always at the root of anxiety, conflicts, or even health problems. A good employer must therefore balance the needs of the Company and those of its employees. CERN’s current contract policy, as described in the Administrative Circular No 2, states that staff members should first obtain a limited duration (LD) contract of up to five years. Then, if they want to stay in the Organization, staff members must apply, usually once a year, and before the end of their LD contract, for an indefinite contract (IC) post. All candidates for an IC post are considered by the Review Board for the award of indefinite contracts (Review Board) which will choose the most suita...

  1. Proposal for the award of a contract for the supply of austenitic steel strips for collars of the LHC superconducting dipole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of 410 mm-wide austenitic steel strips for the collars of the LHC superconducting dipole magnets. Following a market survey carried out among 39 firms in twelve Member States and two firms in Japan, a call for tenders (IT-2618/LHC/LHC) was sent on 3 June 1999 to five firms in four Member States and two firms in Japan. The Council agreed to the Management?s proposal to invite Japanese industry to participate, where appropriate, in calls for tenders for supplies for the LHC Project (CERN/CC/2110). By the closing date, CERN had received six tenders. The Finance Committee is invited to approve the negotiation of a contract with the firm NIPPON STEEL CORPORATION (JP) for the supply of 11 000 tonnes of 410 mm-wide austenitic steel strips for the collars of the LHC superconducting dipole magnets for a total amount of 4 298 943 000 Japanese yen, subject to revision for contractual deliveries after 31 December 2000, with an option for the supply of up to 10...

  2. Proposal for the award of a contract for the supply of hollow copper conductors for the coils of the mqw quadrupole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of up to 105 500 kilogrammes of hollow copper conductors, of two different dimensions, for the MQW quadrupole magnets. Following a market survey carried out among 30 firms in 13 Member States and one firm in Japan, a call for tenders (IT-2620/SL/LHC) was sent on 24 September 1999 to three firms in two Member States. By the closing date, CERN had received two tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm OUTOKUMPU PORICOPPER (FI) for the supply of 105 500 kilogrammes of hollow copper conductors, of two different dimensions, for the MQW quadrupole magnets for a total amount of 1 024 932 Swiss francs, subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of up to 10 550 kilogrammes of additional hollow copper conductors, of two different dimensions, for a total amount of 102 493 Swiss francs, subject to revision for contractual deliveries after 31 Decemb...

  3. Proposal for the award of a blanket contract for automatic air-sampling systems for fire and gas detection in the LHC experiments

    CERN Document Server

    2004-01-01

    This document concerns the award of a blanket contract for automatic air-sampling systems for fire and gas detection in the LHC experiments. Following a market survey carried out among 119 firms in ten Member States, a call for tenders (IT-2891/ST) was sent on 1 August 2003 to four firms, in three Member States. By the closing date, CERN had received two tenders from one firm and one consortium, in three Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with ICARE (FR), the lowest bidder, for the supply of automatic air-sampling systems for fire and gas detection in the LHC experiments for a total amount not exceeding 1 750 000 euros (2 714 000 Swiss francs), subject to revision for inflation from 1 January 2007 with options for air-sampling smoke detection systems for electrical racks, for an additional amount of 400 000 euros (620 000 Swiss francs), subject to revision for inflation from 1 January 2007, bringing the total amount to a maximum of 2 150 000 euros...

  4. 25 CFR 900.216 - What other statutes and regulations apply to contract disputes?

    Science.gov (United States)

    2010-04-01

    ... HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Post-Award Contract Disputes § 900.216 What other statutes and regulations apply to... 25 Indians 2 2010-04-01 2010-04-01 false What other statutes and regulations apply to contract...

  5. U.S., European ALMA Partners Award Prototype Antenna Contracts

    Science.gov (United States)

    2000-03-01

    The U.S. and European partners in the Atacama Large Millimeter Array (ALMA) project have awarded contracts to U.S. and Italian firms, respectively, for two prototype antennas. ALMA is a planned telescope array, expected to consist of 64 millimeter-wave antennas with 12-meter diameter dishes. The array will be built at a high-altitude, extremely dry mountain site in Chile's Atacama desert, and is scheduled to be completed sometime in this decade. On February 22, 2000, Associated Universities Inc. (AUI) signed an approximately $6.2 million contract with Vertex Antenna Systems, of Santa Clara, Calif., for construction of one prototype ALMA antenna. AUI operates the U.S. National Radio Astronomy Observatory (NRAO) for the National Science Foundation under a cooperative agreement. The European partners contracted with the consortium of European Industrial Engineering and Costamasnaga, of Mestre, Italy, on February 21, 2000, for the production of another prototype. (Mestre is located on the inland side of Venice.) The two antennas must meet identical specifications, but will inherently be of different designs. This will ensure that the best possible technologies are incorporated into the final production antennas. Only one of the designs will be selected for final production. Several technical challenges must be met for the antennas to perform to ALMA specifications. Each antenna must have extremely high surface accuracy (25 micrometers, or one-third the diameter of a human hair, over the entire 12-meter diameter). This means that, when completed, the surface accuracy of the ALMA dishes will be 20 times greater than that of the Very Large Array (VLA) antennas, and about 50 times greater than dish antennas for communications or radar. The ALMA antennas must also have extremely high pointing accuracy (0.6 arcseconds). An additional challenge is that the antennas, when installed at the ALMA site in Chile, will be exposed to the ravages of weather at 16,500 feet (5000 meters

  6. 32 CFR 37.505 - What resources are available to assist me during the pre-award business evaluation?

    Science.gov (United States)

    2010-07-01

    ...-Award Business Evaluation § 37.505 What resources are available to assist me during the pre-award business evaluation? Administrative agreements officers of the Defense Contract Management Agency and the... 32 National Defense 1 2010-07-01 2010-07-01 false What resources are available to assist me during...

  7. 48 CFR 2052.215-79 - Contract award and evaluation of proposals.

    Science.gov (United States)

    2010-10-01

    ... offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to... discussions with offerors. The Government reserves the right to seek proposal clarifications (e.g., capability... competition among the most highly rated proposals. (e) The Government reserves the right to make an award on...

  8. Next Indefinite Contract review exercise

    CERN Multimedia

    2013-01-01

    Dear Colleagues, We are pleased to inform you that the 2013 LD2IC exercise (selection process for the conversion of limited-duration contracts to indefinite contracts) was officially launched last week.  The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 9 August 2013 for a period of four weeks (until 8 September 2013). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: Information on the location of these sessions will be provided in due course on the CERN announcements page. HR Department

  9. Proposal for the award of a contract for the supply of the external cryogenic sub-system for the magnets of the ATLAS experiment

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply, including design, installation, commissioning and testing at CERN of the external cryogenic sub-system for the magnets of the ATLAS experiment. Following a market survey carried out among 28 firms in eight Member States and eight firms in two non-Member States, a call for tenders (IT-2807/EP/ATLAS) was sent on 17 August 2000 to two firms in two Member States. By the closing date, CERN had received tenders from the two firms. The Finance Committee is invited to agree to the negotiation of a contract with LINDE KRYOTECHNIK (CH), the lowest bidder, for the design, supply, installation, commissioning and testing at CERN of the external cryogenic sub-system for the magnets of the ATLAS experiment for a total amount of 6 652 000 Swiss francs, not subject to revision, with options for interconnecting low- and high-pressure warm piping and for spare parts, for an additional amount of 910 170 Swiss francs, not subject to revision, bringing the total amount...

  10. Proposal for the award of a contract for the supply of a supervisory control and data acquisition system for the four LHC experiments

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of a Supervisory Control and Data Acquisition (SCADA) system for the control of the four LHC experiments. Following a market survey carried out among 63 firms in thirteen Member States and one firm in Israel, a call for tenders (IT-2814/IT) was sent on 29 May 2000 to two firms and two consortia, each consisting of two firms, in four Member States. By the closing date, CERN had received four tenders from three firms and one consortium in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with ETM (AT), the lowest bidder complying with the specification, for the supply of a Supervisory Control and Data Acquisition (SCADA) system for the control of the four LHC experiments, including consultancy services and training, for a total amount of 407 500 euros (634 000 Swiss francs), not subject to revision, and 10 years? maintenance for a total amount of 308 500 euros (480 000 Swiss francs), subject to annual rev...

  11. 48 CFR 1319.811-3 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... shall insert the clause 1352.219-71, Notification to Delay Performance (Deviation), in solicitations and...) Direct Award (Deviation), in direct contracts and purchase orders processed under the Partnership... 1352.219-72, Notification of Competition Limited to Eligible 8(a) Concerns, Alternate III (Deviation...

  12. Proposal for the award of a contract for the supply of 26 000 lead-tungstate scintillation crystals for the CMS electromagnetic calorimeter

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of 26 000 lead-tungstate scintillation crystals for the barrel part of the CMS Electromagnetic Calorimeter (ECAL). Following a CERN market survey (MS-2727/EP/CMS) carried out among seven firms in four Member States and two firms in two non-Member States, the Eidgenössische Technische Hochschule in Z rich (ETHZ) published on 15 February 2001 an open call for tenders and, in addition, invited tenders from four firms in two non-Member States, including the two firms identified in the CERN market survey. By the closing date, the ETHZ had received one bid from a firm in a CERN Member State and three bids from three firms in two non-Member States. The Finance Committee is invited to agree to the negotiation of a contract to be placed by CERN, on behalf of the ETHZ, with the lowest bidder, SCIONIX (NL), for the supply of 26 000 lead-tungstate crystals for the barrel part of the CMS ECAL for a total amount of 9 392 000 US dollars (16 060 320 Swiss francs)...

  13. Proposal for the award of a contract for the supply and installation of the cryogenic helium refrigeration system for the CMS experiment

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply and installation of the cryogenic helium refrigeration system for the CMS Experiment. Following a market survey carried out among 22 firms in seven Member States and seven firms in two non-Member States, a call for tenders (IT-2576/EP/CMS) was sent on 17 February 1999 to two firms in two Member States and one firm in one non-Member State. By the closing date, CERN had received two tenders. The Finance Committee is invited to agree to the negotiation of a contract with AIR LIQUIDE (FR), the lowest bidder, for the supply and installation of a cryogenic helium refrigeration system for an amount of 4 552 500 euros, subject to revision, with an option for one liquid nitrogen dewar and a one-year extension of the warranty period, for an amount of 205 000 euros, subject to revision, bringing the total amount to 4 757 500 euros. At the rate of exchange given in the tender, this amount is equal to 7 612 000 Swiss francs. This procurement will be financed by...

  14. 75 FR 5115 - Temporary Concession Contract for Lake Mead National Recreation Area, AZ/NV

    Science.gov (United States)

    2010-02-01

    ... National Recreation Area, AZ/NV AGENCY: National Park Service, Department of the Interior. ACTION: Notice of intention to award temporary concession contract for Lake Mead National Recreation Area. SUMMARY: Pursuant to 36 CFR 51.24, public notice is hereby given that the National Park Service intends to award a...

  15. Naval Surface Warfare Center Dahlgren Division: Application of Lean Six Sigma in the Pre-Award Procurement Process

    Science.gov (United States)

    2008-09-01

    partments. Thr ough our researc h a nd per sonal experi ences, it has be come apparent that LSS can help contracting professionals take a closer look at...Presentations Contract Closeout Award Contract Contract Admin Issue Solicitation Pre-Solicitation Process: Market Research Source Selection Plan Sole...acquisition related inform ation for use by all of the Departm ent of De fense.” This en ables S pecialists to conduct market research by viewing what

  16. Physician Personal Services Contract Enforceability: The Influence of the Thirteenth Amendment.

    Science.gov (United States)

    Fasko, Steven A; Kerr, Bernard J; Alvarez, M Raymond; Westrum, Andrew

    We explore the influence of the Thirteenth Amendment to the US Constitution on the enforceability of personal services contracts for physicians. This influence extends from the ambiguous definition to the legal interpretation of personal services contracts. The courts have struggled with determining contracts to be a personal service and whether to grant injunctions for continued performance. The award or denial of damages due to a breach of contract is vested in these enforceability complications. Because of the Thirteenth Amendment's influence, courts and contracting parties will continue to struggle with physician personal services contract enforceability; although other points of view may exist. Possible solutions are offered for health care contract managers dealing with challenges attributable to physician personal services contracts.

  17. 13 CFR 125.2 - Prime contracting assistance.

    Science.gov (United States)

    2010-01-01

    ... suitable for award to one or more small business concerns. (iii) Single contract, as used in this... individuals and small business concerns owned and controlled by women; and (ii) Avoid unnecessary and... the rate of participation provided under the subcontracting plan for small business in the performance...

  18. Process Improvement for Interinstitutional Research Contracting.

    Science.gov (United States)

    Varner, Michael; Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca

    2015-08-01

    Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the "business entity" was the research support personnel of both healthcare systems whose "customers" were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. © 2015 Wiley Periodicals, Inc.

  19. 48 CFR 47.205 - Availability of term contracts and basic ordering agreements for transportation or for...

    Science.gov (United States)

    2010-10-01

    ... TRANSPORTATION Contracts for Transportation or for Transportation-Related Services 47.205 Availability of term... is generally more economical and efficient for most agencies to make use of term contracts and basic... on behalf of other activities and agencies. For instance, GSA awards term contracts for services such...

  20. Proposal for the Award of a Contract for the Supply of 40 Broadband Transistorised RF 200 W Amplifiers for the LHC Transverse Damper System

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of 40 broadband transistorised RF 200 W amplifiers for the LHC transverse damper system. Following a market survey carried out among 30 firms in twelve Member States, a call for tenders (IT-3171/SL/LHC) was sent on 20 February 2003 to five firms in four Member States. By the closing date, CERN had received two tenders from two firms in two Member States. The Finance Committee is invited to agree to the negotiation of a contract with THALES (BE), the lowest bidder complying with the specification, for the supply of 40 broadband transistorised RF 200 W amplifiers for the LHC transverse damper system for a total amount of 1 044 819 euros (1 563 049 Swiss francs), not subject to revision, with an option for an additional 20 broadband transistorised RF amplifiers, for an additional amount of 305 740 euros (457 387 Swiss francs), subject to revision for inflation from 1 July 2005, bringing the total amount to a maximum of 1 350 559 euros (2 020 436 Swiss...

  1. DOE'S award fees at Rocky Flats do not adequately reflect ES and H problems

    International Nuclear Information System (INIS)

    1989-10-01

    Despite the persistance of significant environmental, safety, and health problems at the Rocky Flats plant, it's contractor has received substantial monetary awards from the Department of Energy for operating the plant. During fiscal years 1986 through 1988, approximately $26.8 million was received in award fees - about 84 percent of the total award fees that were available under the contract with DOE. This report identified a number of problems that raise concerns about how the award process is being administered: significant ES and H deficiencies have been downplayed in the evaluation process; the process has placed more emphasis on production rather than on ES and H performance; and the evaluations have not been reviewed by DOE headquarters organizations that have important roles in the conduct of activities. This report recommends that DOE restructure its award fee process to provide a clear understanding to its contractors what they will be losing in award fees for certain types of ES and H problems

  2. Shared visions: Partnership of Rockwell International and NASA Cost Effectiveness Enhancements (CEE) for the space shuttle system integration program

    Science.gov (United States)

    Bejmuk, Bohdan I.; Williams, Larry

    As a result of limited resources and tight fiscal constraints over the past several years, the defense and aerospace industries have experienced a downturn in business activity. The impact of fewer contracts being awarded has placed a greater emphasis for effectiveness and efficiency on industry contractors. It is clear that a reallocation of resources is required for America to continue to lead the world in space and technology. The key to technological and economic survival is the transforming of existing programs, such as the Space Shuttle Program, into more cost efficient programs so as to divert the savings to other NASA programs. The partnership between Rockwell International and NASA and their joint improvement efforts that resulted in significant streamlining and cost reduction measures to Rockwell International Space System Division's work on the Space Shuttle System Integration Contract is described. This work was a result of an established Cost Effectiveness Enhancement (CEE) Team formed initially in Fiscal Year 1991, and more recently expanded to a larger scale CEE Initiative in 1992. By working closely with the customer in agreeing to contract content, obtaining management endorsement and commitment, and involving the employees in total quality management (TQM) and continuous improvement 'teams,' the initial annual cost reduction target was exceeded significantly. The CEE Initiative helped reduce the cost of the Shuttle Systems Integration contract while establishing a stronger program based upon customer needs, teamwork, quality enhancements, and cost effectiveness. This was accomplished by systematically analyzing, challenging, and changing the established processes, practices, and systems. This examination, in nature, was work intensive due to the depth and breadth of the activity. The CEE Initiative has provided opportunities to make a difference in the way Rockwell and NASA work together - to update the methods and processes of the organizations

  3. Shared visions: Partnership of Rockwell International and NASA Cost Effectiveness Enhancements (CEE) for the space shuttle system integration program

    Science.gov (United States)

    Bejmuk, Bohdan I.; Williams, Larry

    1992-01-01

    As a result of limited resources and tight fiscal constraints over the past several years, the defense and aerospace industries have experienced a downturn in business activity. The impact of fewer contracts being awarded has placed a greater emphasis for effectiveness and efficiency on industry contractors. It is clear that a reallocation of resources is required for America to continue to lead the world in space and technology. The key to technological and economic survival is the transforming of existing programs, such as the Space Shuttle Program, into more cost efficient programs so as to divert the savings to other NASA programs. The partnership between Rockwell International and NASA and their joint improvement efforts that resulted in significant streamlining and cost reduction measures to Rockwell International Space System Division's work on the Space Shuttle System Integration Contract is described. This work was a result of an established Cost Effectiveness Enhancement (CEE) Team formed initially in Fiscal Year 1991, and more recently expanded to a larger scale CEE Initiative in 1992. By working closely with the customer in agreeing to contract content, obtaining management endorsement and commitment, and involving the employees in total quality management (TQM) and continuous improvement 'teams,' the initial annual cost reduction target was exceeded significantly. The CEE Initiative helped reduce the cost of the Shuttle Systems Integration contract while establishing a stronger program based upon customer needs, teamwork, quality enhancements, and cost effectiveness. This was accomplished by systematically analyzing, challenging, and changing the established processes, practices, and systems. This examination, in nature, was work intensive due to the depth and breadth of the activity. The CEE Initiative has provided opportunities to make a difference in the way Rockwell and NASA work together - to update the methods and processes of the organizations

  4. Consolidating staff augmentation contracts improves teamwork and reduces costs

    International Nuclear Information System (INIS)

    Townsend, J.; Sibilla, L.; Gregovich, J.W.

    1991-01-01

    Nuclear power plants have traditionally used multiple contracting firms to provide temporary staff augmentation personnel primarily because of two perceptions: (1) managers believe they have greater access to a higher quality, readily available pool of applicants. (2) using multiple contractors inherently keeps costs down as a result of several competitors submitting resumes for the same position. This paper provides information, based on the experiences of a leading nuclear power plant, that disproves these perceptions. It explains why consolidating several contracts for professional and technical classifications (excluding craft labor and refueling personnel) and competitively bidding and awarding the contract to a single contracting firm promotes teamwork and reduces costs

  5. Next Indefinite Contract review exercise

    CERN Multimedia

    2015-01-01

    Dear Colleagues, We are pleased to inform you that the 2015 LD2IC exercise (selection process for the conversion of limited-duration contracts into indefinite contracts) has been officially launched. The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 3 August 2015 for a period of four weeks (until 31 August 2015). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions (FAQ) and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: We would like to remind you that all staff members holding a limited-duration contract who have successfully completed their probation period at the time of application and who meet the eligibility criteria in the vacancy notices (VNs) are eligible to apply for posts for the awa...

  6. 77 FR 23369 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Science.gov (United States)

    2012-04-18

    ... Business Administration (SBA) may not accept a sole- source 8(a) contract in excess of $20 million for... is no conflict with the law. Execution of the J&A prior to the SBA's initiation of contract... small number of businesses that have been awarded 8(a) contracts over the $20 million threshold may be...

  7. Proposal for the Award of a Contract for the Supply of 18kV Power Transformers Rated 464 kVA to 2 MVA

    CERN Document Server

    2002-01-01

    This document concerns the award of a contract for the supply of thirty-five 18 kV cast-resin rectifier power transformers rated 464 kVA to 2 MVA and 26 protective enclosures. Following a market survey (MS-2920/SL/LHC) carried out among 56 firms in sixteen Member States, a call for tenders (IT-3007/SL/LHC) was sent on 12 August 2002 to eight firms in five Member States. By the closing date, CERN had received three tenders from three firms in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with TRASFOR (CH), the lowest bidder, for the supply of 35 power transformers rated 464 kVA to 2 MVA and 26 protective enclosures for a total amount of 1 398 500 Swiss francs, not subject to revision, with an option for three additional transformers and protective enclosures, for an additional amount of 107 650 Swiss francs, subject to revision for inflation from 1 January 2005, bringing the total amount to 1 506 150 Swiss francs subject to revision for inflation from 1 January...

  8. Proposal for the award of a contract for the supply of polyimide film for cable and ground insulation of the LHC superconducting magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of up to 79 tonnes of polyimide film, of three different types, for cable and ground insulation of the LHC superconducting magnets. A call for tenders (IT-2679/LHC/LHC) was sent on 21 September 1999 to two firms in Japan and one firm in the USA. By the closing date, CERN had received three tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm KANEKA (JP), the lowest bidder, for the supply of 79 tonnes of polyimide film of three different types for an amount of 5 425 541 USD (8 123 284 Swiss francs) for the polyimide film produced in the USA, not subject to revision, and 725 726 546 Japanese yen (10 109 020 Swiss francs) for the polyimide film produced in Japan, not subject to revision, with an option for the supply of up to 20% additional polyimide film of each type, for an amount of 1 085 108 USD (1 624 657 Swiss francs) and 145 145 309 Japanese yen (2 021 804 Swiss francs) respectively, not subject to r...

  9. Cost, Outcome, and Oversight of Iraq Oil Reconstruction Contract with Kellogg Brown & Root Services, Inc

    National Research Council Canada - National Science Library

    Warren, David R; Casill, Bonnie; Nguyen, Tinh; Ragsdale, Nancy; Thompson, Charles

    2009-01-01

    ... U.S. Army Corps of Engineers (USACE) and performed by Kellogg Brown & Root Services, Inc. (KBR), related to rebuilding the southern portion of Iraq's oil infrastructure. This contract was competitively awarded in January 2004 (contract W9126G-04- D-0001).

  10. Prestigious award for SOHO

    Science.gov (United States)

    2003-09-01

    SOHO spacecraft artist's impression hi-res Size hi-res: 451 Kb Credits: ESA SOHO spacecraft SOHO is a project of international cooperation between ESA and NASA. SOHO's science ranges from the Sun's hot interior, through its visible surface and stormy atmosphere, and out to distant regions where the wind from the Sun battles with a breeze of atoms coming from among the stars. The award recognises both the outstanding achievements in designing, building and operating the mission, as well as the science it has performed. It is a tribute to a team that has contributed to one of the most successful space missions in history. The International Academy of Astronautics presents this award in recognition of extraordinary performance and achievement by teams of scientists, engineers and managers in the field of astronautics. This honour has been awarded only twice before - to the Russian Mir Space Station Team and the US Space Shuttle Team. Now the SOHO team joins this select group. The citation of the award for the SOHO team reads: "To the team of scientists, engineers and managers for the development and operation of a world-class mission leading to substantial advancements in understanding the Sun and the solar-terrestrial relationship." SOHO has an impressive and unique list of achievements. For instance, it produced the first ever images of the turbulent outer shell of the Sun and of the structure below sunspots. It gave the most precise measurements of the solar temperature structure, the interior rotation and the gas flows inside the Sun. It measured the acceleration of the fast and slow solar winds and discovered new solar phenomena, such as solar tornadoes. It revolutionised our ability to forecast space weather, and helped our understanding of the impact of solar variability on Earth's climate. During eight years of operation, the team has had to face several heart-stopping moments, but with extraordinary team spirit, skill and competence, they turned these

  11. Interpretation of Written Contracts in England

    Directory of Open Access Journals (Sweden)

    Neil Andrews

    2014-01-01

    Full Text Available This article examines the leading principles governing interpretation of written contracts under English law. This is a comprehensive and incisive analysis of the current law and of the relevant doctrines, including the equitable principles of rectification, as well as the powers of appeal courts or of the High Court when hearing an appeal from an arbitral award. The topic of interpretation of written contracts is fast-moving. It is of fundamental importance because this is the most significant commercial focus for dispute and because of the number of cross-border transactions to which English law is expressly applied by businesses.

  12. ALMA Partners Award Prototype Antenna Contracts in Europe and the USA

    Science.gov (United States)

    2000-03-01

    The European and U.S. partners in the Atacama Large Millimeter Array (ALMA) project have awarded contracts to firms in Italy and the USA, respectively, for two prototype antennas. ALMA is a planned telescope array, expected to consist of 64 millimeter-wave antennas with 12-meter diameter dishes, cf. ESO Press Release 09/99 and ESO PR Video Clip 08/99. The array will be built at a high-altitude, extremely dry mountain site in Chile's Atacama desert, and is scheduled to be completed sometime in this decade. The European partners contracted with the consortium of European Industrial Engineering and Costamasnaga (Mestre, Italy), on February 21, 2000, for the production of one prototype ALMA antenna. On February 22, 2000, Associated Universities Inc. signed a contract with Vertex Antenna Systems (Santa Clara, California), for construction of another prototype antenna. The two antennas must meet identical specifications, but will inherently be of different designs. This will ensure that the best possible technologies are incorporated into the final production antennas. Several technical challenges must be met for the antennas to perform to ALMA specifications. Each antenna must have extremely high surface accuracy (25 µm, or one-third the diameter of a human hair, over the entire 12-meter diameter). This means that, when completed, the surface accuracy of the ALMA dishes will be 20 times greater than that of the Very Large Array (VLA) antennas near Socorro (New Mexico, USA), and about 50 times greater than dish antennas for communications or radar. The ALMA antennas must also have extremely high pointing accuracy (0.6 arcseconds). An additional challenge is that the antennas, when installed at the ALMA site in Chile, will be exposed to the ravages of weather at 5000 m elevation. All previous millimeter-wavelength antennas that meet such exacting specifications for surface accuracy and pointing accuracy have been housed within telescope enclosures. The U.S. and European

  13. Proposal for the award of a contract for the design, supply, installation, commissioning and testing at CERN of eight helium dryer units for the LHC

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the design, supply, installation, commissioning and testing at CERN of eight helium dryer units for the LHC. Following a market survey carried out among 42 firms in ten Member States, a call for tenders (IT-2722/LHC/LHC) was sent on 10 August 2000 to seven firms and three consortia, consisting of two firms each, in seven Member States. By the closing date, CERN had received five tenders from three firms and two consortia in five Member States. The Finance Committee is invited to agree to the negotiation of a contract with the firm COSMI (IT), the lowest bidder fulfilling the technical requirements, for the design, supply, installation, commissioning and testing at CERN of eight helium dryer units for a total amount of 3 514 779 euros, (5 307 329 Swiss francs), not subject to revision, with options for additional equipment for heating the adsorber bed and additional heat exchanger/condenser equipment, for an additional amount of 80 081 euros (120 923 Swiss fra...

  14. Proposal for the award of a contract for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system

    CERN Document Server

    European Organization for Nuclear Research

    2002-01-01

    This document concerns the award of a contract for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system. Following a market survey carried out among 61 firms in ten Member States and 14 firms in three non-Member States, a call for tenders (IT-2624/EP/ATLAS) was sent on 19 April 2002 to four firms and three consortia in six Member States and two firms in one non-Member State. By the closing date, CERN had received three tenders. The Finance Committee is invited to agree to the negotiation of a contract with AIR LIQUIDE ITALIA (IT), the lowest bidder, for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system for a total amount not exceeding 2 840 000 euros (4 191 300 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. This procurement will be financed by the ATLAS Common Fund and CERN's contribution will not exceed 8...

  15. NASA/MSFC/NSSTC Science Communication Roundtable

    Science.gov (United States)

    Adams, M. L.; Gallagher, D. L.; Koczor, R.; Six, N. Frank (Technical Monitor)

    2002-01-01

    The Science Directorate at Marshall Space Flight Center (MSFC) conducts a diverse program of Internet-based science communication through a Science Roundtable process. The Roundtable includes active researchers, writers, NASA public relations staff, educators, and administrators. The Science@NASA award-winning family of Web sites features science, mathematics, and space news to inform, involve, and inspire students and the public about science. We describe here the process of producing stories, results from research to understand the science communication process, and we highlight each member of our Web family.

  16. Calendar for the forthcoming indefinite contract review procedure

    CERN Multimedia

    2012-01-01

    As announced, the publication of vacancy notices for posts opened with a view to the award of an indefinite contract has started on 6 July. The last information session for candidates is planned for Tuesday 7 August 2012 at 2 p.m. More information here. HR Department

  17. An Analysis of USMC Facilities Support Contracts with a Focus on Base Maintenance

    Science.gov (United States)

    2017-06-01

    success and customer satisfaction . Furthermore, it is in the best interest of all for the contractor to know immediately of any noted deficiencies in...award a contract for an ill- defined requirement. The end result is a less expensive contract, happier contractor, and happier customers . Therefore, a...Supplement [NMCARS], 2016). Performance-based contracting, as defined in FAR 2.101, is “an acquisition structured around the results to be achieved

  18. Defense Contractor Restructuring; DoD Risks Forfeiting Savings on Fixed-Price Contracts

    National Research Council Canada - National Science Library

    1998-01-01

    ... on fixed-price contracts awarded to companies involved in a business combination between the time a combination is announced and the time that restructuring savings are reflected in the mechanism used...

  19. Energy conservation. Federal shared energy savings contracting

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Milans, Flora H.; Kirk, Roy J.; Welker, Robert A.; Sparling, William J.; Butler, Sharon E.; Irwin, Susan W.

    1989-04-01

    A number of impediments have discouraged federal agencies from using shared energy savings contracts. As of November 30, 1988, only two federal agencies - the U.S. Postal Service (USPS) and the Department of the Army -had awarded such contracts even though they can yield significant energy and cost savings. The three major impediments we identified were uncertainty about the applicability of a particular procurement policy and practice, lack of management incentives, and difficulty in measuring energy and cost savings. To address the first impediment, the Department of Energy (DOE) developed a manual on shared energy savings contracting. The second impediment was addressed when the 100th Congress authorized incentives for federal agencies to enter into shared savings contracts. DOE addressed the third impediment by developing a methodology for calculating energy consumption and cost savings. However, because of differing methodological preferences, this issue will need to be addressed on a contract-by-contract basis. Some state governments and private sector firms are using performance contracts to reduce energy costs in their buildings and facilities. We were able to identify six states that were using performance contracts. Five have established programs, and all six states have projects under contract. The seven energy service companies we contacted indicated interest in federal shared energy savings contracting

  20. Incentive contracts for development projects

    Science.gov (United States)

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  1. Award of two contracts for the renting of magnetic tape drives and tape libraries for LHC data storage and the purchase of the associated tape cartridges

    CERN Document Server

    2005-01-01

    This document concerns the award of two contracts for the renting and possible subsequent purchase of magnetic tape drives and tape libraries for LHC data storage. The Finance Committee is invited to agree to the procedure described in section 3 of this document for the evaluation and possible subsequent purchase of tape drives and tape libraries for the storage of data from the LHC experiments. Subject to approval of this procedure, the Finance Committee is further invited to approve the negotiation of a contract for the renting of tape drives and tape libraries for evaluation purposes from IBM, for an amount of 579 707 Swiss francs, and from StorageTek, for an amount of 472 297 Swiss francs, during the period January 2006 â?" March 2007, plus the purchase of the associated tape cartridges for amounts of 202 500 Swiss francs and 284 748 Swiss francs respectively. The Finance Committee will be informed of the results of the evaluation by the end of 2006 and, subject to the outcome, will be invited to approve...

  2. Proposal for the award of two contracts for the supply of fine-blanked austenitic steel collars for the cold masses of the LHC superconducting dipole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of two contracts for the supply of 12 500 000 fine-blanked austenitic steel collars in three different shapes and of two different types for the cold masses of the LHC superconducting dipole magnets. Following a market survey carried out among 70 firms in fourteen Member States and one firm in Japan, a call for tenders (IT-2469/LHC/LHC) was sent on 3 June 1999 to eleven firms in five Member States and one firm in Japan. By the closing date, CERN had received five tenders. The Finance Committee is invited to agree to the negotiation of two contracts with: - MALVESTITI (IT) for the supply of up to 7 812 500 fine-blanked austenitic steel collars, which represents 5/8 of the total quantity required for the cold masses of the LHC superconducting dipole magnets, for a total amount of up to 6 908 509 Swiss francs, subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of up to 4 687 500 additional fine-blanked austenitic steel collars, wh...

  3. Awards to academic institutions by the Department of Transportation in FY 1975

    Energy Technology Data Exchange (ETDEWEB)

    Megerian, G.K.; Whitfield, H.L.

    1976-02-20

    A comprehensive listing is given of contracts and grants awarded by the Department of Transportation to colleges and universities during fiscal year 1975. The awards are categorized into seven different schemes. Subject areas include (1) carpooling; (2) problems of the elderly and the handicapped; (3) energy; (4) environment; (5) facilities and services; (6) Federal Government role; (7) freight movement; (8) human factors; (9) land use planning; (10) management; (11) materials; (12) motorcycles; (13) noise; (14) personal rapid transit; (15) rural planning; (16) safety; (17) systems development; (18) taxicabs; (19) technology; (20) traffic control; (21) training; (22) tunneling; and (23) urban planning. (PMA)

  4. 76 FR 71465 - Defense Federal Acquisition Regulations Supplement; Notification Requirements for Awards of...

    Science.gov (United States)

    2011-11-18

    ...-order contract award concerns intelligence or intelligence- related activities of DoD, notification shall also be provided to the Select Committee on Intelligence of the Senate and Permanent Select Committee on Intelligence of the House of Representatives. II. Discussion and Analysis of Public Comments A...

  5. An Analysis of the Acquisition Process for Simplified Acquisition of Base Engineering Requirements (SABER) Contracts and Its Potential Impact on Contractor Performance

    National Research Council Canada - National Science Library

    Heaps, Brian

    2001-01-01

    The Simplified Acquisition of Base Engineering Requirements (SABER) contract's main purpose is to expedite contract award of civil engineer requirements through the issuance of individual delivery orders...

  6. Defense Small Business Innovation Research Program (SBIR). Abstracts of Phase 2 Awards, 1984.

    Science.gov (United States)

    165 proposals for funding in Phase II of the Small Business Innovation Research (SBIR) Program. These proposals were selected from those submitted by... small research and development firms awarded Phase I contracts from the FY 1984 solicitation. In order to make information available on the technical

  7. NASA 3D Models: Cassini

    Data.gov (United States)

    National Aeronautics and Space Administration — Cassini spacecraft from SPACE rendering package, built by Michael Oberle under NASA contract at JPL. Includes orbiter only, Huygens probe detached. Accurate except...

  8. Proposal for the award of a contract for the design, supply, installation and commissioning of a ventilation and air conditioning system for the ECN3 experimental area and the TCC8 and GHN300 service tunnels and for the dismantling of the existing system

    CERN Document Server

    2014-01-01

    Proposal for the award of a contract for the design, supply, installation and commissioning of a ventilation and air conditioning system for the ECN3 experimental area and the TCC8 and GHN300 service tunnels and for the dismantling of the existing system

  9. NASA SBIR abstracts of 1991 phase 1 projects

    Science.gov (United States)

    Schwenk, F. Carl; Gilman, J. A.; Paige, J. B.

    1992-01-01

    The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  10. NASA SBIR abstracts of 1990 phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.

    1991-01-01

    The research objectives of the 280 projects placed under contract in the National Aeronautics and Space Administration (NASA) 1990 Small Business Innovation Research (SBIR) Phase 1 program are described. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses in response to NASA's 1990 SBIR Phase 1 Program Solicitation. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 280, in order of its appearance in the body of the report. The document also includes Appendixes to provide additional information about the SBIR program and permit cross-reference in the 1990 Phase 1 projects by company name, location by state, principal investigator, NASA field center responsible for management of each project, and NASA contract number.

  11. NASA SBIR abstracts of 1992, phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.; Sacknoff, S. M.

    1993-01-01

    The objectives of 346 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1992 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 346, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1992 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  12. Proposal for the Award of a Contract for the Supply of 13 kA and 20.5 kA, 18 V Switched-Mode Power Converters for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of 13 kA and 20.5 kA, 18 V switched-mode power converters using sub-converters of 3.25 kA. Following a market survey (MS-2866/SL/LHC) carried out among 81 firms in seventeen Member States and a call for tenders for prototypes (IT-2919/SL/LHC) sent on 11 June 2001, a call for tenders for the supply of the pre-series and series of 13 kA and 20.5 kA, 18 V switched-mode power converters both using sub-converters of 3.25 kA was sent to two firms on 17 September 2002. The Finance Committee is invited to agree to the negotiation of a contract with TRANSTECHNIK (DE), the only firm that has delivered a successfully qualifying prototype, for the supply of eighteen 13 kA and one 20.5 kA, 18 V switched-mode power converters and spares for a total amount of 4 607 731 euros (6 747 300 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract val...

  13. NASA university program management information system, FY 1985

    Science.gov (United States)

    1985-01-01

    The University Program Report provides current information and related statistics for approximately 4200 grants/contracts/cooperative agreements active during the reporting period. NASA Field Centers and certain Headquarters Program Offices provide funds for those research and development activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-University relationship, frequently denoted, collectively, as NASA's University Program.

  14. NASA university program management information system, FY 1994

    Science.gov (United States)

    1994-01-01

    The University Program report, Fiscal Year 1994, provides current information and related statistics for 7841 grants/contracts/cooperative agreements active during the reporting period. NASA field centers and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  15. NASA University Program Management Information System: FY 1995

    Science.gov (United States)

    1995-01-01

    The University Program Report, Fiscal Year 1995, provides current information and related statistics for grants/contracts/cooperative agreements active during the report period. NASA field centers and certain Headquarters program offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  16. NASA university program management information system, FY 1986

    Science.gov (United States)

    1986-01-01

    The University Program Report provides current information and related statistics for approximately 4300 grants/contracts/cooperative agreements active during the report period. NASA Field centers and certain Headquarters Program Offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  17. NASA University program management information system, FY 1993

    Science.gov (United States)

    1993-01-01

    The University Program Report, Fiscal Year 1993, provides current information and related statistics for 7682 grants/contracts/cooperative agreements active during the report period. NASA field centers and certain Headquarters program offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  18. Defense Contracting in Iraq: Issues and Options for Congress

    Science.gov (United States)

    2008-08-15

    9 Rapid Acquisition Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Audits, Investigations, and...01468/]. 5 LOGCAP contracts have been previously awarded for work in Rwanda, Haiti, Saudi Arabia, Kosovo, Ecuador, Q atar , Italy, southeastern Europe...Acquisition Methods . Section 811 of the FY2005 National Defense Authorization Act32 grants the Secretary of Defense limited rapid acquisition

  19. Manufacturers’ Bids for WIC Infant Formula Rebate Contracts, 2003-2013

    OpenAIRE

    Oliveira, Victor; Davis, David

    2015-01-01

    The U.S. Department of Agriculture’s Special Supplemental Nutrition Program for Women, Infants, and Children (WIC) is the major purchaser of infant formula in the United States, and its mandatory rebate program saved WIC $1.9 billion in FY 2013. WIC State agencies are required by law to have competitively bid infant formula rebate contracts with infant formula manufacturers. Contracts are awarded to the manufacturer offering the WIC State agency the lowest net price (as determined by the manu...

  20. Proposal for the award of a contract for the supply of superconducting cables for the LHC low-current insertion (mqm) and wide-aperture insertion (mqy) quadrupoles

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of the superconducting cables for the LHC low-current insertion (MQM) and wide-aperture insertion (MQY) quadrupoles. A call for tenders (IT-2631/LHC/LHC) was sent to four firms in four Member States, three firms in Japan and two firms in the USA on 3 June 1999. By the closing date, CERN had received seven tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm VACUUMSCHMELZE (DE) for the supply of all superconducting cables for the LHC MQM and MQY quadrupoles for a total net price of 3 240 257 euros, subject to revision after 31 December 2000, with an option to procure additional cables representing 10% of the initial quantity for a total net price of 324 026 euros, bringing the total to an amount of 3 564 283 euros, subject to revision after 31 December 2000. At the exchange rate given in the tender, these amounts correspond to 5 192 720 Swiss francs, 519 272 Swiss francs and 5 711 992 Swiss francs respect...

  1. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

  2. CMS Awards

    CERN Multimedia

    2004-01-01

    Ali Mohammad Rafiee receives the CMS Gold Award from Michel Della Negra of CMS. As part of the fifth annual CMS Awards, Iranian contractor HEPCO, located in Arak, an industrial town 200 km west of Tehran, received their Gold Award in a ceremony held on 14 June 2004 (the other award winners were reported in bulletin 13/2004). The Awards are given each year to a small number of the approximately one thousand contractors working on the CMS project. Gold Awards are given for outstanding technical achievement in work carried out for the detector. HEPCO received the Award for the excellent quality of their work in constructing two 25 tonne support tables, two 75 tonne shields (FCS) and eight supporting brackets to lower the HF into the cavern. Welds and machining obtained tolerances that were very difficult in structures of that size. Mr. A. M. Rafiee, the General Manager of the company, acknowledged the benefits of this collaboration, and thanked the efforts and skills of the many staff involved.

  3. 76 FR 46206 - NASA Implementation of Federal Acquisition Regulation (FAR) Award Fee Language Revision

    Science.gov (United States)

    2011-08-02

    ... of Federal Acquisition Regulation (FAR) Award Fee Language Revision AGENCY: National Aeronautics and... Acquisition Circular (FAC) 2005-46. DATES: Effective Date: August 2, 2011. FOR FURTHER INFORMATION CONTACT... on February 8, 2011 (76 FR 6696) implementing Federal Acquisition Circular (FAC) 2005-46 which...

  4. 41 CFR 101-26.503 - Multiple award schedule purchases made by GSA supply distribution facilities.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Multiple award schedule... Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.503...

  5. NASA's Heliophysics Theory Program - Accomplishments in Life Cycle Ending 2011

    Science.gov (United States)

    Grebowsky, J.

    2011-01-01

    NASA's Heliophysics Theory Program (HTP) is now into a new triennial cycle of funded research, with new research awards beginning in 2011. The theory program was established by the (former) Solar Terrestrial Division in 1980 to redress a weakness of support in the theory area. It has been a successful, evolving scientific program with long-term funding of relatively large "critical mass groups" pursuing theory and modeling on a scale larger than that available within the limits of traditional NASA Supporting Research and Technology (SR&T) awards. The results of the last 3 year funding cycle, just ended, contributed to ever more cutting edge theoretical understanding of all parts of the Sun-Earth Connection chain. Advances ranged from the core of the Sun out into the corona, through the solar wind into the Earth's magnetosphere and down to the ionosphere and lower atmosphere, also contributing to understanding the environments of other solar system bodies. The HTP contributions were not isolated findings but continued to contribute to the planning and implementation of NASA spacecraft missions and to the development of the predictive computer models that have become the workhorses for analyzing satellite and ground-based measurements.

  6. Decreasing Skin Graft Contraction through Topical Wound Bed Preparation with Anti-Inflammatory Agents

    Science.gov (United States)

    2017-10-01

    Award Number: W81XWH-14-2-0153 TITLE: Decreasing Skin Graft Contraction through Topical Wound Bed Preparation with Anti-Inflammatory Agents...09/14/2017 4. TITLE AND SUBTITLE “Decreasing Skin Graft Contraction through Topical Wound Bed Preparation with Anti-Inflammatory Agents” 5a...of a specific topical anti-inflammatory drug that will reduce and shorten the inflammatory state of the recipient wound bed and thus, skin graft

  7. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  8. Energy efficiency performance contracts in the school environment; Contrats de performance energetique dans le milieu scolaire

    Energy Technology Data Exchange (ETDEWEB)

    Drouin, J. [Quebec Ministere de l' Education, Ste-Foy, PQ (Canada)

    1999-12-01

    An overview of new regulations concerning the awarding of energy performance contracts by school boards in the province of Quebec is provided. The article deals with buildings belonging to boards of education that are wholly or primarily utilised for educational purposes. It provides an inventory of such buildings and statistical information about about energy consumption and energy-related costs of educational facilities during the school years 1996/1997 and 1997/1998. Regarding the new regulations, the principal change appears to be that school boards are required to award construction or building services contracts estimated to cost between $50,000 and $100,000 either by public requests for tenders, or by invitation; construction or building services contracts whose cost exceeds $100,000 must be awarded by public tender. In effect, to meet the energy efficiency criteria specified in the new regulations, school boards are obliged to call for bids on any project that contribute to the energy efficiency of school buildings whose cost is estimated to exceed $50,000. The objective of the new regulation is to encourage the consideration of energy efficiency standards by school boards, and by potential contractors. The regulations also prescribe the method of requesting bids and specifies the energy efficiency criteria bidders must meet in order to be eligible.

  9. 48 CFR 216.505-70 - Orders under multiple award contracts.

    Science.gov (United States)

    2010-10-01

    ... under each order as one of the factors in the selection decision; and (4) The contracting officer should... statute expressly authorizes or requires that the purchase be made from a specified source; or (2) One of... the intent to make the purchase, including a description of the supplies to be delivered or the...

  10. 48 CFR 1815.404-471 - NASA structured approach for profit or fee objective.

    Science.gov (United States)

    2010-10-01

    ... for profit or fee objective. 1815.404-471 Section 1815.404-471 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1815.404-471 NASA structured approach for profit or fee objective. ...

  11. NAVIGATING A QUALITY ROUTE TO A NATIONAL SAFETY AWARD

    Energy Technology Data Exchange (ETDEWEB)

    PREVETTE SS

    2009-05-26

    Center. On October 1,2008, a transition occurred that changed Fluor's role at Hanford. Fluor's work at Hanford was split in two with the technical scope being assumed by the CH2M HILL Plateau Remediation Company (CHPRC) CHPRC is now spearheading much of the cleanup work associated with former nuclear-processing facilities, contaminated groundwater, and transuranic waste. Fluor is an integrated subcontractor to CH PRC in this effort. In addition, at the time of this writing, while the final outcome is being determined for the new Mission Support Contract, Fluor Hanford has had its contract extended to provide site-wide services that include security, fire protection, infrastructure, and operating the HAMMER facility. The emphasis has to be on doing work safely, delivering quality work, controlling costs, and meeting deadlines. Statistical support is provided by Fluor to the PRC, within Fluor Hanford, and to a third contractor, Washington Closure Hanford, which is tasked with cleaning up approximately 210 square miles designated as the Columbia River corridor along the outer edge of the Hanford Site. The closing months of Fluor Hanford's 12 year contract were busy, characterized by special events that capped its work as a prime cleanup contractor, transitions of work scope and personnel, and the completion numerous activities. At this time, Fluor's work and approach to safety were featured in state and national forums. A 'Blockbuster' presentation at the Washington State Governor's Industrial Safety Conference in September 2008 featured Fluor Hanford's Chief Operating Officer, a company Safety Representative, and me. Simultaneously, an award ceremony in Anaheim, Calif. recognized Fluor Hanford as the winner of the 2008 Robert W. Campbell Award. The Robert W. Campbell Award is co-sponsored by Exxon Mobil Corporation and the National Safety Council. Named after a pioneer of industrial safety, the Campbell Award recognizes organizations

  12. Proposal for the award of a contract for the supply of four-quadrant switched-mode power converters rated at ± 120, ± 10V for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of power converters rated at ±120A, ±10V for the LHC. Following a market survey carried out among 147 firms in nineteen Member States, a call for tenders (IT-3037/AB/LHC) was sent on 5 May 2003 to 10 firms and three consortia, each consisting of two firms, in nine Member States. By the closing date, CERN had received nine tenders from nine firms in seven Member States. The Finance Committee is invited to agree to the negotiation of a contract with EFACEC (PT), the lowest conforming bidder after realignment, for the supply of 339 four-quadrant switched-mode power modules and 110 racks for a total amount of 1 652 128 euros (2 534 894 Swiss francs), not subject to revision, with an option for the supply of additional power modules and racks, for a total amount of 142 846 euros (219 171 Swiss francs), subject to revision for inflation from 1 January 2006, bringing the total amount to a maximum of 1 794 974 euros (2 754 065 Swiss francs). The rate of ...

  13. Proposal for the award of a contract for the supply of moulded assemblies of tape-wound cut cores of grain-oriented silicon-steel for the LHC beam dumping system

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of moulded assemblies of tape-wound cut cores of grain-oriented silicon-steel for the three different types of fast pulsed magnets for the beam dumping system of the LHC. Following a market survey carried out among 14 firms in four Member States and six firms in two non-Member States, a call for tenders (IT-2674/SL/LHC) was sent on 26 January 2001 to one firm in one Member State. By the closing date, CERN had received a tender from the firm. The Finance Committee is invited to agree to the negotiation of a contract with TELMAG MAGNETIC COMPONENTS (UK), the only bidder, for the supply of 2885 moulded assemblies of tape-wound cut cores of grain-oriented silicon-steel, of three different types, for a total amount of 2 414 664 euros (3 692 147 Swiss francs), not subject to revision, with options for 560 additional moulded core assemblies of three different types, for an additional amount of 468 496 euros (716 355 Swiss francs), not subject to revision,...

  14. Proposal for the award of two contracts for the supply of fine-blanked austenitic steel yoke laminations and inserts for the cold masses of the LHC superconducting dipole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of two contracts for the total supply of 642 000 fine-blanked austenitic steel yoke laminations, of two different types, and 642 000 inserts for the cold masses of the LHC superconducting dipole magnets. Following a market survey carried out among 70 firms in sixteen Member States and one firm in Japan, a call for tenders (IT-2700/LHC/LHC) was sent on 3 June 1999 to seven firms in four Member States and one firm in Japan. By the closing date, CERN had received five tenders. The Finance Committee is invited to agree to the negotiation of two contracts with: - ELAY INDUSTRIAL (ES) for the supply of 324 000 fine-blanked austenitic steel yoke laminations of the first type and the corresponding number of inserts, which represents the total required quantity of laminations of the first type and of corresponding inserts for the cold masses of the LHC superconducting dipole magnets, for a total amount of 481 814 euros, which at the exchange rate given in the tender correspond to 770 8...

  15. Statements of work handbook. [technical writing for NASA programs

    Science.gov (United States)

    1975-01-01

    Guidelines are presented for preparing statements of work (SOW) to assure a consistent approach throughout NASA. Statements of work for study and preliminary definition contracts, for definition and development of major systems, for support services, and for small research and development contracts are discussed.

  16. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    Science.gov (United States)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  17. Government Contracting Should Be a Core Competence for U.S. Military Personnel

    Science.gov (United States)

    2014-12-01

    selves may have distorted the local market , creating inflation problems in the region.65 Thus, long-term projects or services that are to be turned...are injected into the process to avoid rampant single-award-task and-delivery order contracts that effectively inject monopolistic -type pricing

  18. [Boundaries and integrity in the "Social Contract for Spanish Science", 1907-1939].

    Science.gov (United States)

    Gómez, Amparo

    2014-01-01

    This article analyzes the relationship between science and politics in Spain in the early 20th century from the perspective of the Social Contract for Science. The article shows that a genuine social contract for science was instituted in Spain during this period, although some boundary and integrity problems emerged. These problems are analyzed, showing that the boundary problems were a product of the conservative viewpoint on the relationship between science and politics, while the integrity problems involved the activation of networks of influence in the awarding of scholarships to study abroad. Finally, the analysis reveals that these problems did not invalidate the Spanish social contract for science.

  19. Factors influencing decisions on delay claims in construction contracts for Indian scenario

    Directory of Open Access Journals (Sweden)

    Nitin Balkrishna Chaphalkar

    2014-03-01

    Full Text Available Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, which gives rise to claims leading to disputes. These disputes if not handled properly tend to consume time and money of all parties to the contract. To resolve the dispute in optimum time, it is essential to understand the root cause of disputes as early as possible. Hence there is a need of analyzing the disputes scientifically.  The present study reveals from the study of arbitration awards that the causes for delay claims can be grouped in domains and the probable decisions to the disputes can be traced through the probing questions considered by decision makers. This paper attempts to identify questions related to disputes for Indian scenario through literature, arbitration awards, court cases and discussions with professionals.

  20. Factors influencing decisions on delay claims in construction contracts for Indian scenario

    Directory of Open Access Journals (Sweden)

    Nitin Balkrishna Chaphalkar

    2014-03-01

    Full Text Available   Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, which gives rise to claims leading to disputes. These disputes if not handled properly tend to consume time and money of all parties to the contract. To resolve the dispute in optimum time, it is essential to understand the root cause of disputes as early as possible. Hence there is a need of analyzing the disputes scientifically.  The present study reveals from the study of arbitration awards that the causes for delay claims can be grouped in domains and the probable decisions to the disputes can be traced through the probing questions considered by decision makers. This paper attempts to identify questions related to disputes for Indian scenario through literature, arbitration awards, court cases and discussions with professionals.

  1. Proposal for the award of a contract for the supply of four-quadrant switched-mode power converters rated at ±60A, ±8V for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of 834 four-quadrant switched-mode power converters rated at ±60A, ±8V and 200 racks for the LHC. Following a market survey carried out among 154 firms in nineteen Member States, a call for tenders (IT-2944/AB/LHC) was sent on 2 May 2003 to 11 firms and three consortia in twelve Member States. By the closing date, CERN had received eight tenders from eight firms in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with CEL (FR), the lowest bidder complying with the specification, for the supply of 834 four-quadrant switched-mode power converters and 200 racks for a total amount of 2 343 808 euros (3 580 629 Swiss francs), not subject to revision, with an option for additional four-quadrant switched-mode power converters and racks for a total amount of 215 301 euros (328 915 Swiss francs), subject to revision for inflation from 1 January 2006, bringing the overall total to 2 559 109 euros (3 909 544 Swis...

  2. 77 FR 4053 - Agency Information Collection Activities: Post-Award Contract Information

    Science.gov (United States)

    2012-01-26

    ... technological collection techniques or other forms of information technology, e.g., permitting electronic... Acquisition Regulation (FAR) (48 CFR chapter 1). Source selection documentation, Government estimate of... information that is collected are identified in pertinent sections of FAR 4.803, Contents of contract files...

  3. Integration of Multiple Contractors with Performance Type of Contracts

    International Nuclear Information System (INIS)

    BURDGE, L.F.

    2000-01-01

    The management practices, procedures, and processes that are suited to managing Management and Operation (MandO) type of contracts at Department of Energy (DOE) sites, which were cost reimbursement with award fee, are not well suited to managing contracts where fee is determined by performance metrics. Thus a different style of management, requiring substantial revamping of the management process, is needed. This shift in philosophy also requires a dramatic shift in culture. This paper will describe how these changes are being managed at the River Protection Project (RPP), located at the DOE's Hanford Site in Washington State, one of DOE's largest and highest risk environmental clean-up project

  4. Advanced Radioisotope Power Conversion Technology Research and Development

    Science.gov (United States)

    Wong, Wayne A.

    2004-01-01

    NASA's Radioisotope Power Conversion Technology program is developing next generation power conversion technologies that will enable future missions that have requirements that cannot be met by either the ubiquitous photovoltaic systems or by current Radioisotope Power System (RPS) technology. Performance goals of advanced radioisotope power systems include improvement over the state-of-practice General Purpose Heat Source/Radioisotope Thermoelectric Generator by providing significantly higher efficiency to reduce the number of radioisotope fuel modules, and increase specific power (watts/kilogram). Other Advanced RPS goals include safety, long-life, reliability, scalability, multi-mission capability, resistance to radiation, and minimal interference with the scientific payload. NASA has awarded ten contracts in the technology areas of Brayton, Stirling, Thermoelectric, and Thermophotovoltaic power conversion including five development contracts that deal with more mature technologies and five research contracts. The Advanced RPS Systems Assessment Team includes members from NASA GRC, JPL, DOE and Orbital Sciences whose function is to review the technologies being developed under the ten Radioisotope Power Conversion Technology contracts and assess their relevance to NASA's future missions. Presented is an overview of the ten radioisotope power conversion technology contracts and NASA's Advanced RPS Systems Assessment Team.

  5. NASA Office of Small and Disadvantaged Business Utilization

    Science.gov (United States)

    2001-01-01

    The Office of Small and Disadvantaged Business Utilization (OSDBU) within NASA promotes the utilization of small, disadvantaged, and women-owned small businesses in compliance with Federal laws, regulations, and policies. We assist such firms in obtaining contracts and subcontracts with NASA and its prime contractors. The OSDBU also facilitates the participation of small businesses in NASA's technology transfer and commercialization activities. Our driving philosophy is to consider small businesses as our products. Our customers are the NASA Enterprises, Field Centers, Functional Staff Offices, major prime contractors, and other large institutions. We hone the skills of our products to make them marketable to our customers in the performance of NASA missions.

  6. Overview 2004 of NASA Stirling-Convertor CFD-Model Development and Regenerator R&D Efforts

    Science.gov (United States)

    Tew, Roy C.; Dyson, Rodger W.; Wilson, Scott D.; Demko, Rikako

    2005-01-01

    This paper reports on accomplishments in 2004 in development of Stirling-convertor CFD model at NASA GRC and via a NASA grant, a Stirling regenerator-research effort being conducted via a NASA grant (a follow-on effort to an earlier DOE contract), and a regenerator-microfabrication contract for development of a "next-generation Stirling regenerator." Cleveland State University is the lead organization for all three grant/contractual efforts, with the University of Minnesota and Gedeor Associates as subcontractors. Also, the Stirling Technology Co. and Sunpower, Inc. are both involved in all three efforts, either as funded or unfunded participants. International Mezzo Technologies of Baton Rouge, LA is the regenerator fabricator for the regenerator-microfabrication contract. Results of the efforts in these three areas are summarized.

  7. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    Science.gov (United States)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  8. IAEA research contracts. Ninth annual report

    International Nuclear Information System (INIS)

    1969-01-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  9. IAEA research contracts. Ninth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1969-06-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  10. 76 FR 76811 - Stakeholders Meeting Regarding Ready Reserve Force (RRF) Ship Manager Contract Program

    Science.gov (United States)

    2011-12-08

    ... Owner/Operator requirement. 12-ship award limit. Definition of Ship Manager ``business entity..., Maritime Security Program, or Tanker Emergency Preparedness Agreement. Small business, sub-contracting vs... affiliation to Rilla Gaither at [email protected] by close of business Monday, December 5, 2011. DATES...

  11. The Role of Synthetic Biology in NASA's Missions

    Science.gov (United States)

    Rothschild, Lynn J.

    2016-01-01

    The time has come to for NASA to exploit synthetic biology in pursuit of its missions, including aeronautics, earth science, astrobiology and most notably, human exploration. Conversely, NASA advances the fundamental technology of synthetic biology as no one else can because of its unique expertise in the origin of life and life in extreme environments, including the potential for alternate life forms. This enables unique, creative "game changing" advances. NASA's requirement for minimizing upmass in flight will also drive the field toward miniaturization and automation. These drivers will greatly increase the utility of synthetic biology solutions for military, health in remote areas and commercial purposes. To this end, we have begun a program at NASA to explore the use of synthetic biology in NASA's missions, particular space exploration. As part of this program, we began hosting an iGEM team of undergraduates drawn from Brown and Stanford Universities to conduct synthetic biology research at NASA Ames Research Center. The 2011 team (http://2011.igem.org/Team:Brown-Stanford) produced an award-winning project on using synthetic biology as a basis for a human Mars settlement.

  12. Micromachined Parts Advance Medicine, Astrophysics, and More

    Science.gov (United States)

    2015-01-01

    In the mid-1990s, Marshall Space Flight Center awarded two SBIR contracts to Potomac Photonics, now based in Baltimore, for the development of computerized workstations capable of mass-producing tiny, intricate, diffractive optical elements. While the company has since discontinued the workstations, those contracts set the stage for Potomac Photonics to be a leader in the micromachining industry, where NASA remains one of its clients.

  13. Weaknesses in Awarding Fees for the Broad Area Maritime Surveillance Contract

    Science.gov (United States)

    2010-11-02

    Table of Contents Introduction 1 Audit Objectives 1 Background on Broad Area Maritime Surveillance 1...24 Mangement Comments The Assistant Secretary of the Navy for Research, Development, and Acquisition 25... Introduction Audit Objectives This is the first in a series of reports on the contract supporting the Broad Area Maritime

  14. 77 FR 18106 - Award Fee for Service and End-Item Contracts

    Science.gov (United States)

    2012-03-27

    ... payments exceed the final evaluation score, the Contractor will either credit the next payment voucher for... either credit the next payment voucher for the amount of such overpayment or refund the difference to the... fee payments, at a not-to-exceed amount of $100,000 for the contract, in reserve to protect the...

  15. Small Business Innovation Research, Post-Phase II Opportunity Assessment

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.

    2015-01-01

    This report outlines current Small Business Innovation Research (SBIR) Post-Phase II opportunity contract award results for the SBIR technology program from 2007 to 2011 for NASA's Aeronautics Research Mission Directorate (ARMD), Human Exploration and Operations Mission Directorate (HEOMD), Science Mission Directorate (SMD), and Space Technology Mission Directorate (STMD). The report provides guidelines for incorporating SBIR technology into NASA programs and projects and provides a quantitative overview of the post-Phase II award patterns that correspond with each mission directorate at NASA Glenn Research Center (GRC). In recent years, one of NASA's goals has been to not only transfer SBIR technologies to commercial industries, but to ensure that NASA mission directorates incorporate SBIR technologies into their program and project activities. Before incorporating technologies into MD programs, it is important to understand each mission directorate structure because each directorate has different objectives and needs. The directorate program structures follow.

  16. On Beyond Star Trek, the Role of Synthetic Biology in Nasa's Missions

    Science.gov (United States)

    Rothschild, Lynn J.

    2016-01-01

    The time has come to for NASA to exploit the nascent field of synthetic biology in pursuit of its mission, including aeronautics, earth science, astrobiology and notably, human exploration. Conversely, NASA advances the fundamental technology of synthetic biology as no one else can because of its unique expertise in the origin of life and life in extreme environments, including the potential for alternate life forms. This enables unique, creative "game changing" advances. NASA's requirement for minimizing upmass in flight will also drive the field toward miniaturization and automation. These drivers will greatly increase the utility of synthetic biology solutions for military, health in remote areas and commercial purposes. To this end, we have begun a program at NASA to explore the use of synthetic biology in NASA's missions, particularly space exploration. As part of this program, we began hosting an iGEM team of undergraduates drawn from Brown and Stanford Universities to conduct synthetic biology research at NASA Ames Research Center. The 2011 team (http://2011.igem.org/Team:Brown-Stanford) produced an award-winning project on using synthetic biology as a basis for a human Mars settlement and the 2012 team has expanded the use of synthetic biology to estimate the potential for life in the clouds of other planets (http://2012.igem.org/Team:Stanford-Brown; http://www.calacademy.org/sciencetoday/igem-competition/). More recent projects from the Stanford-Brown team have expanded our ideas of how synthetic biology can aid NASA's missions from "Synthetic BioCommunication" (http://2013.igem.org/Team:Stanford-Brown) to a "Biodegradable UAS (drone)" in collaboration with Spelman College (http://2014.igem.org/Team:StanfordBrownSpelman#SBS%20iGEM) and most recently, "Self-Folding Origami" (http://2015.igem.org/Team:Stanford-Brown), the winner of the 2015 award for Manufacturing.

  17. 78 FR 61113 - Acquisition Process: Task and Delivery Order Contracts, Bundling, Consolidation

    Science.gov (United States)

    2013-10-02

    ... definition, a small business is not on its own able to compete. Therefore, SBA proposed to amend Sec. 121.103... multiple award contracts. SBA also proposed a definition for the term ``Small Business Teaming Arrangement... Vol. 78 Wednesday, No. 191 October 2, 2013 Part V Small Business Administration 13 CFR Parts 121...

  18. The Impact of Space Commercialization on Space Agencies: the Case of NASA

    Science.gov (United States)

    Zervos, Vasilis

    2002-01-01

    The purpose of this paper is to examine the hypothesis that commercialisation of space results in inefficient contracting policies by the space agencies, using the US NASA as a case study. Though commercialisation is seen by many as a way to reduce costs in space programmes, as the space industry is seen as a decreasing costs industry, this is not a problem-free process. Commercialisation of space has affected the US and European space industries and policies in two major ways. The first is that the public sector actively encourages mergers and acquisitions of major contractors, confined, however, within the geographical borders of the US and Europe. This follows largely from the perceived benefits of economies of size when competing in global commercial markets. The second is the formation of an increasing number of public-private partnerships (PPPs) in space programmes and a more `cosy' relationship between the two within a public-assistance strategic trade theoretic framework. As ESA's contracting policy of `juste retour' is marked by limited competition, the paper focuses on the case of NASA, which is expected to be more pro- competitive, to examine the impact of commercialisation. With the use of quantitative methods based on time series econometric analysis, the paper shows that NASA's contracting policy, results in increasingly less competition and more rent-favouring contracting. This is attributed to the decreasing number of major contractors in conjunction with the preferential treatment of the domestic space industry (`Buy American'). The results of the paper verify that the support of the domestic space industry in commercial and public space markets results in inefficient contracting policies, with NASA facing the conflicting tasks of a stated policy of enhancing competition and efficiency in contracting, as well as, supporting the competitiveness of the domestic space industry. The paper concludes with an analysis and assessment of solutions to this

  19. 48 CFR 27.303 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ..., or NASA, and the contractor is other than a small business concern or nonprofit organization. (e)(1... business concern or a nonprofit organization, the contracting officer shall use the clause at 52.227-11... may involve novel structures, machines, products, materials, processes, or equipment (including...

  20. NASA Glenn Research Center Support of the Advanced Stirling Radioisotope Generator Project

    Science.gov (United States)

    Wilson, Scott D.; Wong, Wayne A.

    2015-01-01

    A high-efficiency radioisotope power system was being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center. DOE initiated termination of that contract in late 2013, primarily due to budget constraints. Sunpower, Inc., held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with Lockheed Martin to produce ASC-F flight units, and one with Glenn for the production of ASC-E3 engineering unit "pathfinders" that are built to the flight design. In support of those contracts, Glenn provided testing, materials expertise, Government-furnished equipment, inspection capabilities, and related data products to Lockheed Martin and Sunpower. The technical support included material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests were performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests were conducted to characterize performance under operating conditions that are representative of various mission conditions. Despite termination of the ASRG flight development contract, NASA continues to recognize the importance of high-efficiency ASC power conversion for Radioisotope Power Systems (RPS) and continues investment in the technology, including the continuation of the ASC-E3 contract. This paper describes key Government support for the ASRG project and future tests to be used to provide data for ongoing reliability assessments.

  1. Analysis of Air Force Secondary Power Logistics Solution Contract

    Science.gov (United States)

    2010-05-21

    for the F-1 5 award that thc SPLS contract has 9 option years during which the contracting offi cer mUSI determine whether the price for each option...slaled III part 2. $p..",:lal ..!lOrIS muSI he la ~cn 10 m:lkc ~ure Ihal i lone~’\\\\ e ll 0.11)1.𔄀 nOI "prolif ’ ’’l th ;l t\\ tr ForN’, .:~p.:n6...Iludil r~’I,:Oll1mendfllioll thai prup;:r dtlenlli’lO’ll\\)ll for hundling mUSI ~ obl:ained. NOfl-OOIlcur 11’,lh Ic \\’el 01 dclCnlllnftltOTl rtl

  2. Advanced Stirling Convertor (ASC) Development for NASA RPS

    Science.gov (United States)

    Wong, Wayne A.; Wilson, Scott; Collins, Josh

    2014-01-01

    Sunpower's Advanced Stirling Convertor (ASC) initiated development under contract to the NASA Glenn Research Center (GRC) and after a series of successful demonstrations, the ASC began transitioning from a technology development project to flight development project. The ASC has very high power conversion efficiency making it attractive for future Radioisotope Power Systems (RPS) in order to make best use of the low plutonium-238 fuel inventory in the U.S. In recent years, the ASC became part of the NASA-Department of Energy Advanced Stirling Radioisotope Generator (ASRG) Integrated Project. Sunpower held two parallel contracts to produce ASC convertors, one with the Department of Energy/Lockheed Martin to produce the ASC-F flight convertors, and one with NASA GRC for the production of ASC-E3 engineering units, the initial units of which served as production pathfinders. The integrated ASC technical team successfully overcame various technical challenges that led to the completion and delivery of the first two pairs of flight-like ASC-E3 by 2013. However, in late Fall 2013, the DOE initiated termination of the Lockheed Martin ASRG flight development contract driven primarily by budget constraints. NASA continues to recognize the importance of high efficiency ASC power conversion for RPS and continues investment in the technology including the continuation of ASC-E3 production at Sunpower and the assembly of the ASRG Engineering Unit #2. This paper provides a summary of ASC technical accomplishments, overview of tests at GRC, plans for continued ASC production at Sunpower, and status of Stirling technology development.

  3. Small Business Innovation Research. Program solicitation. Closing date: July 21, 1992

    Science.gov (United States)

    1992-01-01

    The National Aeronautics and Space Administration (NASA) invites small businesses to submit Phase 1 proposals in response to its Small Business Innovation Research (SBIR) Program Solicitation 92-1. Firms with research or research and development capabilities (R/R&D) in science or engineering in any of the areas listed are encouraged to participate. This, the tenth annual SBIR solicitation by NASA, describes the program, identifies eligibility requirements, describes the proposal evaluation and award selection process, and provides other information to assist those interested in participating in NASA's SBIR program. It also identifies, in Section 8.0, the technical topics and subtopics in which SBIR Phase 1 proposals are solicited in 1992. These topics and subtopics cover a broad range of current NASA interests but do not necessarily include all areas in which NASA plans or currently conducts research. The NASA SBIR program seeks innovative approaches that respond to the needs, technical requirements, and new opportunities described in the subtopics. The focus is on innovation through the use of emerging technologies, novel applications of existing technologies, exploitation of scientific breakthroughs, or new capabilities or major improvements to existing technologies. NASA plans to select about 320 high-quality research or research and development proposals for Phase 1 contract awards on the basis of this Solicitation. Phase 1 contracts are normally six months in duration and funded up to $50,000, including profit. Selections will be based on the competitive merits of the offers and on NASA needs and priorities.

  4. 78 FR 52964 - Availability of HUD's Fiscal Years 2011 and 2012 Service Contract Inventories

    Science.gov (United States)

    2013-08-27

    ... and 2012 Service Contract Inventories AGENCY: Office of the Chief Procurement Officer, HUD. ACTION... inventories that were awarded in FY 2011 and FY 2012. The inventories are organized by function and are... insure HUD maintains an adequate workforce for operations and to research whether contractors were...

  5. A Benchmark Study of Large Contract Supplier Monitoring Within DOD and Private Industry

    Science.gov (United States)

    1994-03-01

    capability to improve their processes, Ford took a tip from Mazda (25t owned by Ford) and established a technical assistance branch within their buying...thorough assessment of a company’s financial viability prior to contract award), on a contractor which had a long history of successful 72 Ii Government

  6. Proposal for the award of two contracts for the supply of fine-blanked low-carbon steel yoke laminations and inserts for the cold masses of the LHC superconducting dipole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of two contracts for the supply of 5 812 000 fine-blanked low-carbon steel yoke laminations, of two different types, and 5 800 000 inserts for the cold masses of the LHC superconducting dipole magnets. Following a market survey carried out among 70 firms in sixteen Member States and one firm in Japan, a call for tenders (IT-2467/LHC/LHC) was sent on 3 June 1999 to seven firms in four Member States. By the closing date, CERN had received five tenders. The Finance Committee is invited to agree to the negotiation of two contracts with: - FUG (DE) for the supply of 3 632 000 fine-blanked low-carbon steel yoke laminations and 3 625 000 inserts, which represents 5/8 of the total quantity required for the cold masses of the LHC superconducting dipole magnets, for a total amount of 2 525 563 euros, which at the exchange rate given in the tender correspond to 4 019 038 Swiss francs, subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of ...

  7. Introducing NASA's Solar System Exploration Research Virtual Institute

    Science.gov (United States)

    Pendleton, Yvonne

    The Solar System Exploration Research Virtual Institute (SSERVI) is focused on the Moon, near Earth asteroids, and the moons of Mars. Comprised of competitively selected teams across the U.S., a growing number of international partnerships around the world, and a small central office located at NASA Ames Research Center, the institute advances collaborative research to bridge science and exploration goals. As a virtual institute, SSERVI brings unique skills and collaborative technologies for enhancing collaborative research between geographically disparate teams. SSERVI is jointly funded through the NASA Science Mission Directorate and the NASA Human Exploration and Operations Mission Directorate. Current U.S. teams include: Dr. Jennifer L. Heldmann, NASA Ames Research Center, Moffett Field, CA; Dr. William Farrell, NASA Goddard Space Flight Center, Greenbelt, MD; Prof. Carlé Pieters, Brown University, Providence, RI; Prof. Daniel Britt, University of Central Florida, Orlando, FL; Prof. Timothy Glotch, Stony Brook University, Stony Brook, NY; Dr. Mihaly Horanyi, University of Colorado, Boulder, CO; Dr. Ben Bussey, Johns Hopkins Univ. Applied Physics Laboratory, Laurel, MD; Dr. David A. Kring, Lunar and Planetary Institute, Houston, TX; and Dr. William Bottke, Southwest Research Institute, Boulder, CO. Interested in becoming part of SSERVI? SSERVI Cooperative Agreement Notice (CAN) awards are staggered every 2.5-3yrs, with award periods of five-years per team. SSERVI encourages those who wish to join the institute in the future to engage current teams and international partners regarding potential collaboration, and to participate in focus groups or current team activities now. Joining hand in hand with international partners is a winning strategy for raising the tide of Solar System science around the world. Non-U.S. science organizations can propose to become either Associate or Affiliate members on a no-exchange-of-funds basis. Current international partners

  8. MR elastography analysis of stiffness change induced by muscle contraction. President award proceedings

    International Nuclear Information System (INIS)

    Hata, Junichi; Yano, Keichi; Numano, Tomokazu; Yagi, Kazuo; Mizuhara, Kazuyuki; Washio, Toshikatsu; Homma, Kazuhiro; Takamoto, Koichi; Saijyo, Toshio

    2012-01-01

    Magnetic resonance elastography (MRE) was originally advocated in 1995 and has been the subject of recent attention. We employed MRE to characterize the stiffness of skeletal muscle of the lower thigh and changes in that stiffness. We obtained MRE images using a gradient recalled echo pulse sequence with parameters: repetition time (TR)/echo time (TE), 20/3.6 ms; number of excitations (NEX), 3; flip angle, 20deg; matrix, 512 x 512; scan time, 32 s; flex coil; and vibration frequency, 50 Hz. We made a vibration pad of 2 divergence types to excite the lower thigh from both sides evenly. When contraction and relaxation about the skeletal muscles, we enforced MRE. We drew regions of interest (ROI) on the stiffness images and measured it by using sclerometer to compare stiffness. We MRE enabled visualization of changes in the stiffness of skeletal muscles as a result of contraction and relaxation. The lateral gastrocnemius and soleus muscle demonstrated significant difference in stiffness at muscle contraction. MRE also permitted measurement of deep muscle using the muscle sclerometer. MRE allows evaluation of stiffness in a given biological section from the surface to deep tissue. (author)

  9. R&D 100 Awards | NREL

    Science.gov (United States)

    R&D 100 Awards R&D 100 Awards NREL has won 61 R&D 100 Awards. Widely recognized as the Oscars of Invention, the R&D 100 Awards are presented by R&D Magazine to identify and celebrate the top technological advances of the year. Recent R&D 100 Awards 2016 NREL engineers Chuck Booten

  10. NASA work unit system file maintenance manual

    Science.gov (United States)

    1972-01-01

    The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles on research efforts and statistics on fund distribution. The file maintenance operator can add, delete and change records at a remote terminal or can submit punched cards to the computer room for batch update. The system is designed for file maintenance by a person with little or no knowledge of data processing techniques.

  11. Pension Fund award

    CERN Multimedia

    Antonella Del Rosso

    2013-01-01

    The CERN Pension Fund won the Investments & Pensions Europe (IPE) 2013 Gold Award in the Medium Real-Estate Investor category. IPE is the leading European publication on the subject of pensions. The awards were judged by a panel of 22 members, which included leading European investment consultants and pension fund executives.     Théodore Economou (left), the CERN Pension Fund’s Chief Executive Officer, receives the IPE 2013 Gold Award.   The award recognised the “fresh thinking” behind the CERN Pension Fund’s updated real-estate strategy, which has brought it “focus” on “high-quality assets and diversification.” The jury also noted the Fund’s “streamlined and cost-efficient” management, and noted that CERN is “running a tight ship”. While the awards are given by a European institution, they have a worldwide scope, and winners in ot...

  12. A New Availability-Payment Model for Pricing Performance-Based Logistics Contracts

    Science.gov (United States)

    2014-05-01

    Grant number: N00244‐13‐1‐0009 A New “Availability‐ Payment ”  Model  for Pricing Performance‐ Based Logistics Contracts A. KashaniPour, X. Zhu, P...DATE MAY 2014 2. REPORT TYPE 3. DATES COVERED 00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE A New ’Availability‐ Payment ’ Model for...is how the  payment   model  in the contract  quantifies the contractor’s  performance for awarding incentives  or penalties Discrete‐Event Simulator ut

  13. Contract Management Monitoring And Evaluation Of Ghana School Feeding Programme At Atwima Kwanwoma District

    Directory of Open Access Journals (Sweden)

    Andrews Osei Mensah

    2015-08-01

    Full Text Available Ghana School Feeding Programme was introduced at Atwima Kwanwoma District and other parts of the country in 2008 to alleviate hunger and to provide good nutrition for pupils in the public basic schools. Caterers were given contract to provide food to the school pupils on every school-going day under Ghana school feeding programme. Some years have lapsed and there is the need to look back and evaluate this programme taking into consideration the award and management of those contracts. The study also examined how the programme is monitored and evaluated. Data was collected from 80 respondents comprising 29 school pupils and 51 other actors through the use of questionnaire and interview guide It was realised that caterers who are well experience in catering services were awarded contracts based on their past experience and financial abilities through submission of their certificates but not necessarily through bidding. The main component of managing the caterers contract included monitoring payment of debt and problems solving as well as supervision through visiting the schools on quarterly basis. The programme has helped to increase enrolment and retaining pupils in school. It was found out that food giving to the pupils was not served on time not regularly bases and was not sufficient to the pupils as well. The health component of the programme has not been successful as expected. It is recommended that fruits and variety of foods need to be introduced together with de-worming the pupils.

  14. NASA Mission Operations Directorate Preparations for the COTS Visiting Vehicles

    Science.gov (United States)

    Shull, Sarah A.; Peek, Kenneth E.

    2011-01-01

    With the retirement of the Space Shuttle looming, a series of new spacecraft is under development to assist in providing for the growing logistical needs of the International Space Station (ISS). Two of these vehicles are being built under a NASA initiative known as the Commercial Orbital Transportation Services (COTS) program. These visiting vehicles ; Space X s Dragon and Orbital Science Corporation s Cygnus , are to be domestically produced in the United States and designed to add to the capabilities of the Russian Progress and Soyuz workhorses, the European Automated Transfer Vehicle (ATV) and the Japanese H-2 Transfer Vehicle (HTV). Most of what is known about the COTS program has focused on the work of Orbital and SpaceX in designing, building, and testing their respective launch and cargo vehicles. However, there is also a team within the Mission Operations Directorate (MOD) at NASA s Johnson Space Center working with their operational counterparts in these companies to provide operational safety oversight and mission assurance via the development of operational scenarios and products needed for these missions. Ensuring that the operational aspect is addressed for the initial demonstration flights of these vehicles is the topic of this paper. Integrating Dragon and Cygnus into the ISS operational environment has posed a unique challenge to NASA and their partner companies. This is due in part to the short time span of the COTS program, as measured from initial contract award until first launch, as well as other factors that will be explored in the text. Operational scenarios and products developed for each COTS vehicle will be discussed based on the following categories: timelines, on-orbit checkout, ground documentation, crew procedures, software updates and training materials. Also addressed is an outline of the commonalities associated with the operations for each vehicle. It is the intent of the authors to provide their audience with a better

  15. Advanced Stirling Convertor Development for NASA Radioisotope Power Systems

    Science.gov (United States)

    Wong, Wayne A.; Wilson, Scott D.; Collins, Josh

    2015-01-01

    Sunpower Inc.'s Advanced Stirling Convertor (ASC) initiated development under contract to the NASA Glenn Research Center and after a series of successful demonstrations, the ASC began transitioning from a technology development project to a flight development project. The ASC has very high power conversion efficiency making it attractive for future Radioisotope Power Systems (RPS) in order to make best use of the low plutonium-238 fuel inventory in the United States. In recent years, the ASC became part of the NASA and Department of Energy (DOE) Advanced Stirling Radioisotope Generator (ASRG) Integrated Project. Sunpower held two parallel contracts to produce ASCs, one with the DOE and Lockheed Martin to produce the ASC-F flight convertors, and one with NASA Glenn for the production of ASC-E3 engineering units, the initial units of which served as production pathfinders. The integrated ASC technical team successfully overcame various technical challenges that led to the completion and delivery of the first two pairs of flightlike ASC-E3 by 2013. However, in late fall 2013, the DOE initiated termination of the Lockheed Martin ASRG flight development contract driven primarily by budget constraints. NASA continues to recognize the importance of high-efficiency ASC power conversion for RPS and continues investment in the technology including the continuation of ASC-E3 production at Sunpower and the assembly of the ASRG Engineering Unit #2. This paper provides a summary of ASC technical accomplishments, overview of tests at Glenn, plans for continued ASC production at Sunpower, and status of Stirling technology development.

  16. Centennial Challenges Program Overview: How NASA Successfully Involves the General Public in the Solving of Current Technology Gaps

    Science.gov (United States)

    Roman, Monsi C.; Kim, Tony; Sudnik, Janet; Sivak, Amy; Porter, Molly; Cylar, Rosaling; Cavanaugh, Dominique; Krome, Kim

    2017-01-01

    The National Aeronautics and Space Administration (NASA) Centennial Challenges Program, part of the Space Technology Mission Directorate (STMD), addresses key technology needs of NASA and the nation, while facilitating new sources of innovation outside the traditional community. This is done by the direct engagement of the public at large, through the offering of Congressional authorized prize purses and associated challenges developed by NASA and the aerospace community and set up as a competition awarding the prize money for achieving the specified technology goal.

  17. Department of Energy contract/business management initiatives

    International Nuclear Information System (INIS)

    Fisher, S.B.

    1992-01-01

    More than 40 years ago the Department of Energy (DOE) developed a unique contractual instrument called a management and operating contract, to be used for the operation of our weapons production plants and the national laboratories. The contracts are very broad in scope. There is no output objective set forth in the contract. There are no cost targets, nor any contractually motivated cost objectives. Performance is measured against criteria which is often subjective. The time has come to make changes in the structure of these contracts to reflect changes in the work being performed and to make the contractors more accountable. DOE's work now, at these sites, and for years to come, consists largely of major project-type work such as environmental restoration which lends itself to a more definitized structure. DOE is in the process of implementing a work order authorization control system (task order contracting) under its management and operating contracts. Target date for implementation for our for-profit contractors is FY 1992, and for the non-profit contractors is FY 1993. Under this system, requirements will be contracted for as entities of work and contractors will be held accountable for performance, schedules and costs. Billings, payments and award fee will be tied to the specific planning objectives set forth in the tasks, including costs and schedules. Incentives will be provided for outstanding performance, fee may be withheld if performance is unacceptable. These changes will necessitate more DOE oversight of contractor operations and sound business support systems, as well as effective management disciplines. US DOE will perform business management reviews to assure contractors' systems are adequate and to support this form of contracting. The Contractor Procurement Systems Review Program will be enhanced to assure good subcontractor procurement practices

  18. Electrical, Electronic, and Electromechanical (EEE) Parts Management and Control Requirements for Space Flight Hardware and Critical Ground Support Equipment...aka... The NASA EEE Parts Standard, NASA-STD 8739.10

    Science.gov (United States)

    Majewicz, Peter; Sampson, Michael

    2016-01-01

    Describes development and content of a new NASA Standard for Electrical Electronic and Electromechanical (EEE) parts. This Standard reflects current practices, instead of changing them. Most NASA Centers utilize local documents, but there is minimal consistency across the Agency. A gap analysis clearly shows the differences that exist among the different centers and with respect to the NASA Parts Policy. Once approved, the new standard can be referenced in contracts and agreements with organizations outside of NASA.

  19. NASA Research Announcement Phase 1 Report and Phase 2 Proposal for the Development of a Power Assisted Space Suit Glove Assembly

    Science.gov (United States)

    Cadogan, Dave; Lingo, Bob

    1996-01-01

    In July of 1996, ILC Dover was awarded Phase 1 of a contract for NASA to develop a prototype Power Assisted Space Suit glove to enhance the performance of astronauts during Extra-Vehicular Activity (EVA). This report summarizes the work performed to date on Phase 1, and details the work to be conducted on Phase 2 of the program. Phase 1 of the program consisted of research and review of related technical sources, concept brainstorming, baseline design development, modeling and analysis, component mock-up testing, and test data analysis. ILC worked in conjunction with the University of Maryland's Space Systems Laboratory (SSL) to develop the power assisted glove. Phase 2 activities will focus on the design maturation and the manufacture of a working prototype system. The prototype will be tested and evaluated in conjunction with existing space suit glove technology to determine the performance enhancement anticipated with the implementation of the power assisted joint technology in space suit gloves.

  20. Climate Leadership Award for Excellence in GHG Management (Goal Achievement Award)

    Science.gov (United States)

    Apply to the Climate Leadership Award for Excellence in GHG Management (Goal Achievement Award), which publicly recognizes organizations that achieve publicly-set aggressive greenhouse gas emissions reduction goals.

  1. 34 CFR 84.605 - Award.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Award. 84.605 Section 84.605 Education Office of the Secretary, Department of Education GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Definitions § 84.605 Award. Award means an award of financial assistance by the Department of Education or...

  2. Apache, Santa Fe energy units awarded two Myanmar blocks

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Myanmar's state oil company has awarded production sharing contracts (PSCs) on two blocks to units of Apache Corp. and Santa Fe Energy Resources Inc., both of Houston. That comes on the heels of a report by County NatWest Woodmac that notes Myanmar's oil production, currently meeting less than half the country's demand, is set to fall further this year. 150 line km of new seismic data could be acquired and one well drilled. During the initial 2 year exploration period on Block EP-3, Apache will conduct geological studies and conduct at least 200 line km of seismic data

  3. Market performance and bidders' bidding behavior in the New York Transmission Congestion Contract market

    International Nuclear Information System (INIS)

    Zhang, Ning

    2009-01-01

    Using publicly available bidder level bids data for Transmission Congestion Contracts (TCCs) and the realized awards of TCCs in the NYISO monthly reconfiguration auctions from June 2000 to December 2004, we examine both market performance and bidders' bidding behavior in the auctions. The data show significant under-pricing in the realized awards of TCCs. Theories suggest that under-pricing may arise from risk-aversion, monopsonistic market power or winner's curse. Our empirical analysis illustrates that all of the three effects play a role in the NYISO TCCs market. Both market performance and bidders' bidding strategies can be best explained by the theoretical model with asymmetric information and risk-averse bidders. (author)

  4. Evaluating the Effectiveness of the 2003-2004 NASA SCIence Files(trademark) Program

    Science.gov (United States)

    Caton, Randall H.; Ricles, Shannon S.; Pinelli, Thomas E.; Legg, Amy C.; Lambert, Matthew A.

    2005-01-01

    The NASA SCI Files is an Emmy award-winning series of instructional programs for grades 3-5. Produced by the NASA Center for Distance Learning, programs in the series are research-, inquiry-, standards-, teacher- and technology-based. Each NASA SCI Files program (1) integrates mathematics, science, and technology; (2) uses Problem-Based Learning (PBL) to enhance and enrich the teaching and learning of science; (3) emphasizes science as inquiry and the scientific method; (4) motivates students to become critical thinkers and active problem solvers; and (5) uses NASA research, facilities, and personnel to raise student awareness of careers and to exhibit the "real-world" application of mathematics, science, and technology. In April 2004, 1,500 randomly selected registered users of the NASA SCI Files were invited to complete a survey containing a series of questions. A total of 263 surveys were received. This report contains the quantitative and qualitative results of that survey.

  5. NASA's Universe of Learning: Engaging Learners in Discovery

    Science.gov (United States)

    Cominsky, L.; Smith, D. A.; Lestition, K.; Greene, M.; Squires, G.

    2016-12-01

    NASA's Universe of Learning is one of 27 competitively awarded education programs selected by NASA's Science Mission Directorate (SMD) to enable scientists and engineers to more effectively engage with learners of all ages. The NASA's Universe of Learning program is created through a partnership between the Space Telescope Science Institute, Chandra X-ray Center, IPAC at Caltech, Jet Propulsion Laboratory Exoplanet Exploration Program, and Sonoma State University. The program will connect the scientists, engineers, science, technology and adventure of NASA Astrophysics with audience needs, proven infrastructure, and a network of over 500 partners to advance the objectives of SMD's newly restructured education program. The multi-institutional team will develop and deliver a unified, consolidated suite of education products, programs, and professional development offerings that spans the full spectrum of NASA Astrophysics, including the Exoplanet Exploration theme. Program elements include enabling educational use of Astrophysics mission data and offering participatory experiences; creating multimedia and immersive experiences; designing exhibits and community programs; providing professional development for pre-service educators, undergraduate instructors, and informal educators; and, producing resources for special needs and underserved/underrepresented audiences. This presentation will provide an overview of the program and process for mapping discoveries to products and programs for informal, lifelong, and self-directed learning environments.

  6. Regional Super ESPC Saves Energy and Dollars at NASA's Johnson Space Center

    International Nuclear Information System (INIS)

    Federal Energy Management Program

    2001-01-01

    This case study about energy saving performance contacts (ESPCs) presents an overview of how the NASA's Johnson Space Flight Center established an ESPC contract and the benefits derived from it. The Federal Energy Management Program instituted these special contracts to help federal agencies finance energy-saving projects at their facilities

  7. 48 CFR 1845.405-70 - NASA procedures.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA procedures. 1845.405... ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Contractor Use and Rental of Government Property 1845.405... and research property if such property is used in performing services or manufacturing articles for...

  8. 13 CFR 124.503 - How does SBA accept a procurement for award through the 8(a) BD program?

    Science.gov (United States)

    2010-01-01

    ... under the 8(a) BD program. (g) Basic Ordering Agreements (BOAs). A Basic Ordering Agreement (BOA) is not a contract under the FAR. See 48 CFR 16.703(a). Each order to be issued under the BOA is an... BOA in addition to offering and accepting the BOA itself. (1) SBA will not accept for award on a sole...

  9. Specific performance as a primary remedy in the South African law of contract

    Directory of Open Access Journals (Sweden)

    Jean Chrysostome Kanamugire

    2015-07-01

    Full Text Available Specific performance is a primary remedy for breach of contract available for the aggrieved party. This order emphasises the performance of contractual obligations. Although the plaintiff can elect to claim specific performance from the defendant, the court has a discretion to grant or decline the order of specific performance. The discretion must be exercised judicially and does not confine on rigid rules. Courts decide each case according to its own facts and circumstances. Plaintiff has a right of election whether to claim specific performance from the defendant or damages for breach of contract. The defendant does not enjoy any choice in this matter. As a general rule, specific performance is not often awarded in the contract of services. However, recent developments have demonstrated that specific performance will usually be granted in employment contracts if there is equality of bargaining power among contracting parties and such order will not produce undue hardship to the defaulting party. Public policy generally favours the utmost freedom of contract and requires that parties should respect or honour their contractual obligations in commercial transactions. Public policy is rooted in the constitution and can sparingly be used to strike down contracts. Specific performance should not continue to be a primary remedy for breach of contract. Contracting parties should be allowed to resile from the contract and use damages as a remedy for breach of contract

  10. 48 CFR 1823.7001 - NASA solicitation provisions and contract clauses.

    Science.gov (United States)

    2010-10-01

    ..., RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Safety and Health 1823.7001 NASA... official(s) responsible for matters of safety and occupational health, determines that the application of... containing the provision at 1852.223-70. This provision may be modified to identify specific information that...

  11. Evaluation of Contracting and Production Activities at: The Defense Logistics Agency’s Defense Supply Centers. Volume 3. Defense Personnel Support Center Review.

    Science.gov (United States)

    1984-03-01

    with GAO; GAO sustained only 1. The Maybank Amendment also complicates both the bidding and award process. Normally, the DoD Appropriation Act...precludes DoD from paying a price differential on contracts awarded for labor surplus area (LSA) set-asides. This restriction, known as the Maybank Amendment...personnel believe that the frequency of bid protests has increased as a consequence of the bidding complica- tions introduced by the Maybank revision

  12. CMS Industries awarded gold, crystal

    CERN Multimedia

    2006-01-01

    The CMS collaboration honoured 10 of its top suppliers in the seventh annual awards ceremony The representatives of the firms that recieved the CMS Gold and Crystal Awards stand with their awards after the ceremony. The seventh annual CMS Awards ceremony was held on Monday 13 March to recognize the industries that have made substantial contributions to the construction of the collaboration's detector. Nine international firms received Gold Awards, and General Tecnica of Italy received the prestigious Crystal Award. Representatives from the companies attended the ceremony during the plenary session of CMS week. 'The role of CERN, its machines and experiments, beyond particle physics is to push the development of equipment technologies related to high-energy physics,'said CMS Awards Coordinator Domenico Campi. 'All of these industries must go beyond the technologies that are currently available.' Without the involvement of good companies over the years, the construction of the CMS detector wouldn't be possible...

  13. NASA/MSFC/NSSTC Science Communication Roundtable

    Science.gov (United States)

    Adams, Mitzi L.; Gallagher, D. L.; Koczor, R. J.; Whitaker, Ann F. (Technical Monitor)

    2001-01-01

    For the last several years the Science Directorate at Marshall Space Flight Center has carried out a diverse program of Internet-based science communication. The Directorate's Science Roundtable includes active researchers, NASA public relations, educators, and administrators. The Science@NASA award-winning family of Web sites features science, mathematics, and space news. The program includes extended stories about NASA science, a curriculum resource for teachers tied to national education standards, on-line activities for students, and webcasts of real-time events. Science stories cover a variety of space-related subjects and are expressed in simple terms everyone can understand. The sites address such questions as: what is space weather, what's in the heart of a hurricane, can humans live on Mars, and what is it like to live aboard the International Space Station? Along with a new look, the new format now offers articles organized by subject matter, such as astronomy, living in space, earth science or biology. The focus of sharing real-time science related events has been to involve and excite students and the public about science. Events have involved meteor showers, solar eclipses, natural very low frequency radio emissions, and amateur balloon flights. In some cases broadcasts accommodate active feedback and questions from Internet participants. Information will be provided about each member of the Science@NASA web sites.

  14. 48 CFR 1815.208 - Submission, modification, revision, and withdrawal of proposals. (NASA supplements paragraph (b))

    Science.gov (United States)

    2010-10-01

    ... late proposal criteria do not apply to Announcements of Opportunity, NASA Research Announcements, and Small Business Innovative Research (SBIR) Phase I and Phase II solicitations, and Small Business... Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT...

  15. Guidelines for cost control and analysis of cost-type research and development contracts

    Science.gov (United States)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  16. Awards aplenty in Krakow

    CERN Multimedia

    2009-01-01

    CERN will be well represented this year at the award ceremony organized by the European Physical Society (EPS) in Krakow. The Gargamelle Collaboration is being awarded the High Energy and Particle Physics prize, while Maurizio Pierini shares the Young Physicist Prize. Both Mick Storr and Andrzej Siemko will be awarded the Medal of the Polish Commission of National Education.This year’s EPS-High Energy and Particle Physics Prize is being awarded to the Gargamelle Collaboration for the discovery of the weak neutral current. Gargamelle’s large bubble chamber is now displayed in the Microcosm garden at CERN in commemoration of the discovery that led to the acceptance of the electroweak theory and the award of the Noble prize to Glashow, Salam and Weinberg in 1979. On 3 September 1973 the collaboration published two papers in the same issue of Physics Letters, one on neutral currents involving electrons, the other on neutral current interactions with hadrons (protons and neut...

  17. International Humanitarian Award.

    Science.gov (United States)

    2017-12-01

    The International Humanitarian Award recognizes extraordinary humanitarian services and activism by psychologists, including professional and volunteer work conducted primarily in the field with underserved populations. Award recipients are psychologists who, by their extraordinary service at a difficult time, improve the lives and contribute to the well-being of people in a large or small geographic area anywhere in the world. The 2017 recipient of the APA International Humanitarian Award was selected by the 2016 Committee on International Relations in Psychology (CIRP). The members of the 2016 CIRP were Melissa Morgan Consoli, PhD, and Arpana G. Inman, PhD (Co-chairs); Rehman Abdulrehman, PhD; Gonzalo Bacigalupe, EdD; Frederic Bemak, EdD; Brigitte Khoury, PhD; Susan Nolan, PhD; Nancy Sidun, PsyD; and Danny Wedding, PhD. Dr. Morgan Consoli, Dr. Inman, Dr. Nolan, and Doctor Sidun were members of the subcommittee for the 2017 award. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  18. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  19. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  20. Institutionalised Public-Private Partnership as a Mixed Contract under the Regime of the New Directive 2014/24/EU

    DEFF Research Database (Denmark)

    Andrecka, Marta

    2014-01-01

    for the purpose of their tendering and award. Even though a number of simplified rules and procedures were introduced, the issues regarding IPPP contracts’ clas- sification and uncertainties raised by recent case law, in particular the Loutraki case and the Oulun kapunki cases,2 stay present. Keeping in mind...... claims that the Court of Justice and the Commission should recognize IPPP contracts as indivisible mixed contracts and establish requirements that need to be fulfilled for such an indivisibil- ity to be granted....

  1. ANALISIS PERBANDINGAN PENGHARGAAN KUALITAS MALCOLM BALDRIGE NATIONAL QUALITY AWARD DENGAN EUROPEAN QUALITY AWARD (MBNQA vs EQA

    Directory of Open Access Journals (Sweden)

    Arfan Bakhtiar Amalia

    2012-02-01

    Full Text Available Persaingan bisnis global saat ini makin ketat. Dengan adanya Malcolm Baldrige National Quality Award (MBNQA dan juga European Quality Award (EQA diharapkan mampu mendorong dan memotivasi perusahaan-perusahaan, baik yang sudah sukses maupun yang sedang berkembang, untuk selalu meningkatkan mutu dan kinerja, serta sebagai kunci daya saing. Dalam makalah ini, kita akan membahas penghargaan kualitas mengenai tujuan, manfaat dan perkembangan, dan trend saat ini, terutama untuk MBNQA dan EQM (European Quality Model. Kita akan membandingkan antara MBNQA dan EQM melalui pengertian, latar belakang, metode-metode, dan kriteria-kriteria, serta aplikasinya, sehingga dapat kita lakukan analisa perbandingan untuk keduanya. Kata Kunci  : Penghargaan Kualitas, Malcolm Baldrige National Quality Award (MBNQA, European Quality Award (EQA   Emulation of global business in this time more and more to tighten. With existence of Malcolm Baldrige National Quality Award (MBNQA as well as European Quality Award (EQA expected can push and motivate companies, both for have successful and also which is expanding, to always increase the quality and performance, and also as competitiveness key. In this paper, we will discuss about national quality award concerning target, benefit, growth, and trend in this time, especially MBNQA and EQM (European Quality Model. We will compare between MBNQA and EQM through congeniality, background, method, and criterions, and also its application,  so that earn us to analyse comparison to both of its. Keyword        : Quality Award, Malcolm Baldrige National Quality Award (MBNQA, European Quality Award (EQA

  2. The USL NASA PC R and D project: General specifications of objectives

    Science.gov (United States)

    Dominick, Wayne D. (Editor)

    1984-01-01

    Given here are the general specifications of the objectives of the University of Southwestern Louisiana Data Base Management System (USL/DBMS) NASA PC R and D Project, a project initiated to address future R and D issues related to PC-based processing environments acquired pursuant to the NASA contract work; namely, the IBM PC/XT systems.

  3. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  4. 7 CFR 3021.605 - Award.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Definitions § 3021.605 Award. Award means an award of financial assistance by the Department of Agriculture or other Federal...

  5. Operation Arctic Heat Case and Exercise for Advanced Contingency Contracting

    Science.gov (United States)

    2012-04-30

    QDR or as required. They aJie intentionru]y focused on "ends" - the ways and means to achieve these ends will !be analyzed and determined in the...establishing a base on Little Diomede Island or improving Kivalina Lagoon (near Red Dog Mine) As the region grows more accessible to human traffic and...may be requ i red from t he host base or cont ractor sources , if avai l abl e . (NOTE: Contracts awarded throughout the deployment should be tailored

  6. IAEA research contracts. Second annual report

    International Nuclear Information System (INIS)

    1962-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  7. IAEA research contracts. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1962-07-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  8. Closing Remarks and Awards

    International Nuclear Information System (INIS)

    Whitaker, M.; Van der Meer, K.; Hamilton, A.

    2015-01-01

    M. Whitaker: On behalf of the Institute of Nuclear Materials Management, we are grateful for the opportunity to support this symposium. The number of symposium events-presentations, posters, technical demonstrations, panel discussions, and receptions - has been completely overwhelming and truly impressive. My compliments to the IAEA organization staff for a spectacular event. I have gained a much better appreciation for why these are only once every four years. This symposium has provided an important opportunity to reengage with friends and colleagues from around the globe to discuss international safeguards topics. The theme this year is very appropriate. So much of our work relies upon people. Together we work to develop the strategies that ensure that international safeguards are effectively implemented to provide the world the assurances that they expect from us. Thank you for this opportunity to share in the organization and execution of this symposium. K. Van der Meer: It is my pleasure to give the last poster awards. We have had two award ceremonies already this week on Wednesday and Thursday to recognize the best posters in those sessions. Today it will be two parts. First we will give the award for the best posters for this morning's sessions, and then we have four special awards: Gold, Silver, Bronze and the New Generation Symposium Award. These are the awards for the best posters for the whole week. The New Generation Symposium Award is for recognition of a younger participant and the prize is also for a younger participant. The full list of award winners is available under the symposium website. The IAEA recognizes the generous donations by INMM and ESARDA of the following prizes given as awards for the best posters: · Best e-poster advertisement per session: free subscription to the ESARDA Bulletin; · Best e-poster per session: free membership in INMM; · Best poster of the week ''Bronze'': free registration for the 8th INMM

  9. 48 CFR 552.216-70 - Economic Price Adjustment-FSS Multiple Award Schedule Contracts.

    Science.gov (United States)

    2010-10-01

    ... ___* percent of the original contract unit price. The Government reserves the right to raise this ceiling where... price increase. (e) The Government reserves the right to exercise one of the following options: (1... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Economic Price Adjustment...

  10. Kennedy NASA Procedural Requirements 1840.19, Indoor Air Quality Section

    Science.gov (United States)

    This Section establishes the IAQ management program at Kennedy Space Center. The support services described in this section are available to all Civil Service organizations and NASA contractor organizations as defined in their respective contracts.

  11. Ames Infusion Stories for NASA Annual Technology Report

    Science.gov (United States)

    Smith, Brandon; Jan, Darrell Leslie; Venkatapathy, Ethiraj

    2015-01-01

    These are short (2-page) high-level summaries of technologies that have been infused - i.e., taken the next level. For example, 3DMAT started off as a Center Innovation Fund (CIF) project and graduated to the Game-changing Program (GCD), where it is being prepared for use in Orion. The Nano Entry System similarly started as CIF and graduated to GCD. The High Tortuosity Carbon Dioxide Conversion Device also started off as CIF and then received an award for further development from the NASA Innovative Advanced Concepts program (NIAC).

  12. NASA technology applications team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    This report covers the activities of the Research Triangle Institute (RTI) Technology Applications Team for the period 1 October 1992 through 30 September 1993. The work reported herein was supported by the National Aeronautics and Space Administration (NASA), Contract No. NASW-4367. Highlights of the RTI Applications Team activities over the past year are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. Appendix B includes Technology Opportunity Announcements and Spinoff! Sheets prepared by the Team while Appendix C contains a series of technology transfer articles prepared by the Team.

  13. Free-Space Quantum Key Distribution with a High Generation Rate KTP Waveguide Photon-Pair Source

    Science.gov (United States)

    Wilson, J.; Chaffee, D.; Wilson, N.; Lekki, J.; Tokars, R.; Pouch, J.; Lind, A.; Cavin, J.; Helmick, S.; Roberts, T.; hide

    2016-01-01

    NASA awarded Small Business Innovative Research (SBIR) contracts to AdvR, Inc to develop a high generation rate source of entangled photons that could be used to explore quantum key distribution (QKD) protocols. The final product, a photon pair source using a dual-element periodically- poled potassium titanyl phosphate (KTP) waveguide, was delivered to NASA Glenn Research Center in June of 2015. This paper describes the source, its characterization, and its performance in a B92 (Bennett, 1992) protocol QKD experiment.

  14. Entrepreneurial Aspirations

    Science.gov (United States)

    1998-01-01

    Recom Technologies, Inc., was established in 1980 by Jack Lee, a former NASA contractor. After forming the new company, Recom was awarded NASA contracts, which eventually grew to 50 percent of the company's business. Two companies have spun-off from Recom, both of which have their basis in NASA technology. The first is Attention Control Systems, Inc. with utilizes intelligent planning software that Recom developed for NASA Ames Computational Sciences Division in a hand-held planner used as an aid in cognitive rehabilitation of brain injury patients. The second is MiraNet, Inc. who uses CLIPS as the foundation for WEXpert, the first rules based help system on the Web.

  15. Arbitration in one easy lesson: a review of criteria used in arbitration awards.

    Science.gov (United States)

    Woolf, D A

    1978-01-01

    Some managers find awards of arbitrators "arbitrary, capricious, and discriminatory", Donald A. Woolf believes, however, that a knowledge of decisional criteria used by arbitrators can help managers to understand how they reason. Among the criteria discussed are the de minimus rule, the major/minor test, promissory estoppel, parol evidence, contract language, past practice, "clean hands", and the punishment fitting the crime (equity). Such knowledge can also help managers avoid actions that are likely to lead to grievances in addition to planning a course of action to avoid grievances going to arbitration in the future.

  16. The Scope of the Arbitral Award Binding Effect (Interests of «Third Parties» in International Arbitration

    Directory of Open Access Journals (Sweden)

    Nataliya Bocharova

    2017-01-01

    Full Text Available Modern business international transactions are multiparty and complicated. Such contracts are usually composed of several contracts which can contain bilateral dispute resolution arrangements. According to the principle of parties autonomy dispute arising between two persons bound by an arbitration agreement in connection with a multiparty project will be resolved by arbitration exclusively between these two parties. Other parties cannot participate in the resolution of the dispute through arbitration, even if they have played an active role in the actual project. Notwithstanding any legitimate interest, they might have the outcome of the dispute; these parties will remain alien both to the arbitration proceedings and an arbitral award. Their interests are not taken into consideration and left unprotected. Arbitration proceedings, unlike litigation, usually do not bear any intervention or joinder of parties, which is explained by the contractual nature of arbitration.Thus, the binding power of an arbitral award extends only over parties of an arbitration agreement. Meanwhile, an arbitral award can affect interests of third parties. How can these parties defend their interests in arbitration proceedings and during recognition and enforcement proceedings in national courts? There are two ways of resolving such problem in state court litigation. The first one is the compulsory participation of any third party with any legitimate interest in litigation through intervention, joinder of parties, and consolidation of cases. A court ex officio has to gather all parties that can have any legitimate interest in resolving the dispute. If judgment affects any interest of a party that was not involved in the proceedings judgment should be reversed in appellate court. The second way is also the solution against parallel proceedings. This way is to harmonize the outcome of parallel proceedings by the principle of lis pendens and res judicata.The paper examines

  17. CMS AWARDS

    CERN Multimedia

    Steven Lowette

    Working under great time pressure towards a common goal in gradual steps can sometimes cause us to forget to take a step back, and celebrate what marvels have been achieved. A general need was felt within CMS to expand the recognition for our young scientists that made outstanding, well recognized and creative contributions to CMS, which served to significantly advance the performance of CMS as a complete and powerful experiment. Therefore, the Collaboration Board endorsed in March 2009 a proposal from the CB Chair and Advisory Group to award each year the newly created "CMS Achievement Award" to fourteen graduate students and postdocs that made exceptional contributions to the Tracker, ECAL, HCAL and Muon subdetectors as well as the TriDAS project, the Commissioning of CMS and the Offline Software and Computing projects. It was also agreed that there was a need to go back in time, and retroactively attribute awards for the years 2007 and 2008 when CMS went from a bare cavern to a detect...

  18. Listing of engineering research contract reports under the DREAM, AERD and ERDAF programs of the Research Branch, 1973-1988

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, B A; Thuns, A; Feldman, M

    1988-01-01

    To supplement in-house investigations, Agriculture Canada contracted out research in a number of programs including three which supported engineering work. This document lists the contracts awarded under the programs and provides reference citations of the contract reports. Reports are grouped by file number, scientific authority, author or contractor, and subject, and a subject index is also included. The three programs are: Development, Research and Evaluation in Agricultural Mechanization (DREAM), Agricultural Engineering Research and Development Program (AERD), and Energy Research and Development in Agriculture and Food (ERDAF). AERD, which replaced DREAM, has been terminated, but the ERDAF program is still continuing as of the date of this document.

  19. The last SPR dinner awards

    Science.gov (United States)

    Tsurutani, Bruce

    1992-03-01

    Because the Solar-Planetary Relationships section of AGU has officially changed its name to Space Physics and Aeronomy (SPA), the December 10, 1991, section dinner award ceremony at the AGU Fall Meeting in San Francisco was the last of the series. Presumably an SPA dinner award series will be started under President-elect Andy Nagy.We have followed our tradition of recognizing the special talents of section members at the annual dinner. This year we had eight awardees. These awards are given in fun and are intended to be humorous. The selection committee defining the awards (the awards are changed regularly to keep people from trying to win one) and selecting the awardees will have to remain anonymous. (The committee is similar to Skull and Bones, but we are politically correct in that we allow women as members.)

  20. Contract for service to produce 50 tonnes sterifeed - lesson learned from semi-commercial scale test production

    International Nuclear Information System (INIS)

    Hassan Hamdani Mutaat; Mat Rasol Awang; Zainon Said; Irwan Md Arif; Alias K Sadeli

    2005-01-01

    A contract for service has been awarded to a local company to produce 50 tonnes Sterifeed in a period of 4 months commencing 3 September 2001. The production was for supplying enough feed for the testing of Sterifeed on cattle. Appointed contractor was required to manage the production, supply labours and provide transport for the full production operation of the plant. The production performance is discussed based on: the labour cost; supervision and control; and skill and training. This report discusses and evaluate the suitability of service for contract for the future commercial scale production. (Author)

  1. Quality New Mexico Performance Excellence Award Roadrunner Application 2016

    Energy Technology Data Exchange (ETDEWEB)

    Petru, Ernest Frank [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-07-06

    The Human Resources (HR) Division is a critical part of Los Alamos National Laboratory, an internationally recognized science and R&D facility with a specialized workforce of more than 10,000. The Laboratory’s mission is to solve national security challenges through scientific excellence. The HR Division partners with employees and managers to support the Laboratory in hiring, retaining, and motivating an exceptional workforce. The Laboratory is owned by the U.S. Department of Energy (DOE), with oversight by the DOE’s National Nuclear Security Administration (NNSA). In 2006, NNSA awarded the contract for managing and operating the Laboratory to Los Alamos National Security, LLC (LANS), and a for-profit consortium. This report expounds on performance excellence efforts, presenting a strategic plan and operations.

  2. NWWA Science Award given

    Science.gov (United States)

    Back, Bill

    John G. Ferris, a U.S. Geological Survey retiree, received the National Water Well Association (NWWA) Science Award for 1985 on September 10, 1985, in Baltimore, Md. The award recognizes Ferris's renowned contributions to the science of groundwater.

  3. IAEA research contracts. Third annual report

    International Nuclear Information System (INIS)

    1963-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  4. IAEA research contracts. Third annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-04-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  5. Nuclear Fusion Award 2009 speech Nuclear Fusion Award 2009 speech

    Science.gov (United States)

    Sabbagh, Steven Anthony

    2011-01-01

    This is an exceptional moment in my career, and so I want to thank all of my teachers, colleagues and mentors who have made this possible. From my co-authors and myself, many thanks to the International Atomic Energy Agency, IOP Publishing, the Nuclear Fusion journal team, and the selection committee for the great honor of receiving this award. Also gratitude to Kikuchi-sensei, not only for the inventive and visionary creation of this award, but also for being a key mentor dating back to his efforts in producing high neutron output in JT-60U. It was also a great honor to receive the award directly from IAEA Deputy Director General Burkart during the 23rd IAEA Fusion Energy Conference in Daejeon. Receiving the award at this venue is particularly exciting as Daejeon is home to the new, next-generation KSTAR tokamak device that will lead key magnetic fusion research areas going forward. I would also like to thank the mayor of Daejeon, Dr Yum Hong-Chul, and all of the meeting organizers for giving us all a truly spectacular and singular welcoming event during which the award was presented. The research leading to the award would not have been possible without the support of the US Department of Energy, and I thank the Department for the continued funding of this research. Special mention must be made to a valuable co-author who is no longer with us, Professor A. Bondeson, who was a significant pioneer in resistive wall mode (RWM) research. I would like to thank my wife, Mary, for her infinite patience and encouragement. Finally, I would like to personally thank all of you that have approached and congratulated me directly. There are no units to measure how important your words have been in this regard. When notified that our paper had been shortlisted for the 2009 Nuclear Fusion Award, my co-authors responded echoing how I felt—honored to be included in such a fine collection of research by colleagues. It was unfathomable—would this paper follow the brilliant work

  6. 10 years of Elsevier/JQSRT awards

    Science.gov (United States)

    Stoop, José; Bernath, Peter F.; Mengüç, M. Pinar; Mishchenko, Michael I.; Rothman, Laurence S.

    2017-10-01

    The Elsevier award program administered by the Editorial Board of the Journal of Quantitative Spectroscopy and Radiative Transfer (JQSRT) was conceived in June of 2006 at the 9th Electromagnetic and Light Scattering Conference in St. Petersburg, Russia. Initially the program included three annual Elsevier/JQSRT awards for exceptional early-career scientists working in the main research fields covered by JQSRT: quantitative spectroscopy, radiative transfer, and electromagnetic scattering. In June of 2010 at the 12th Electromagnetic and Light Scattering Conference in Helsinki, Finland, it was decided to expand the award program to include three biennial Elsevier awards intended to celebrate fundamental life-time achievements of internationally recognized leaders in the same research fields. Finally, in 2013 the Elsevier award program was augmented to include a fourth annual early-career award in the category of atmospheric radiation and remote sensing.

  7. Contract-program evaluation: Impact of the DRG classification system on hospitals' outputs

    OpenAIRE

    Alves, Helder António Pereira Gomes

    2010-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics The present work project aims at evaluating the impact of contract-program implementation in 2003 and of incentives created in 2007 on hospital output, under the DRG inpatient classification system. A sample of five Portuguese acute public district hospitals was chosen as sample, between 2002 and 2007. Results of hypothesis testing ...

  8. SBIR Advanced Technologies in Aviation and Air Transportation System 2016

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.; Kaszeta, Richard W.; Gold, Calman; Corke, Thomas C.; McGowan, Ryan; Matlis, Eric; Eichenlaub, Jesse; Davis, Joshua T.; Shah, Parthiv N.

    2017-01-01

    This report is intended to provide a broad knowledge of various topics associated with NASA's Aeronautics Research Mission Directorate (ARMD), with particular interest on the NASA SBIR contracts awarded from 2011-2012 executed by small companies. The content of this report focuses on the high-quality, cutting-edge research that will lead to revolutionary concepts, technologies, and capabilities that enable radical change to both the airspace system and the aircraft that fly within it, facilitating a safer, more environmentally friendly, and more efficient air transportation system.

  9. Awarding a Prize

    DEFF Research Database (Denmark)

    Moeran, Brian

    2013-01-01

    This article describes and analyses the selection and prize awarding processes for a biennial ceramics exhibition in Japan. Based on long-term fieldwork in the “art world” (Becker 1982) of contemporary Japanese ceramics, as well as on participant observation of the processes concerned, the article...... addresses and draws upon two sets of sociological writings: one concerned with prizes and awards; the other with evaluative practices....

  10. NASA technology utilization program: The small business market

    Science.gov (United States)

    Vannoy, J. K.; Garcia-Otero, F.; Johnson, F. D.; Staskin, E.

    1980-01-01

    Technology transfer programs were studied to determine how they might be more useful to the small business community. The status, needs, and technology use patterns of small firms are reported. Small business problems and failures are considered. Innovation, capitalization, R and D, and market share problems are discussed. Pocket, captive, and new markets are summarized. Small manufacturers and technology acquisition are discussed, covering external and internal sources, and NASA technology. Small business and the technology utilization program are discussed, covering publications and industrial applications centers. Observations and recommendations include small business market development and contracting, and NASA management technology.

  11. Citizen Science as a Tool for Scientific Research and Societal Benefit at NASA

    Science.gov (United States)

    Kaminski, Amy

    2018-01-01

    NASA's strategic goals include advancing knowledge and opportunity in space and improving life on Earth. We support these goals through extensive programs in space and Earth science research accomplished via space-based missions and research funding. NASA's "system" is configured to conduct science using (1) in-house personnel and (2) grants, contracts, and agreements with external entities (academia, industry, international space agencies.

  12. The 2003 NASA Faculty Fellowship Program Research Reports

    Science.gov (United States)

    Nash-Stevenson, S. K.; Karr, G.; Freeman, L. M.; Bland, J. (Editor)

    2004-01-01

    For the 39th consecutive year, the NASA Faculty Fellowship Program (NFFP) was conducted at Marshall Space Flight Center. The program was sponsored by NASA Headquarters, Washington, DC, and operated under contract by The University of Alabama in Huntsville. In addition, promotion and applications are managed by the American Society for Engineering Education (ASEE) and assessment is completed by Universities Space Research Association (USRA). The nominal starting and finishing dates for the 10-week program were May 27 through August 1, 2003. The primary objectives of the NASA Faculty Fellowship Program are to: (1) Increase the quality and quantity of research collaborations between NASA and the academic community that contribute to NASA s research objectives; (2) provide research opportunities for college and university faculty that serve to enrich their knowledge base; (3) involve students in cutting-edge science and engineering challenges related to NASA s strategic enterprises, while providing exposure to the methods and practices of real-world research; (4) enhance faculty pedagogy and facilitate interdisciplinary networking; (5) encourage collaborative research and technology transfer with other Government agencies and the private sector; and (6) establish an effective education and outreach activity to foster greater awareness of this program.

  13. 48 CFR 1852.245-73 - Financial reporting of NASA property in the custody of contractors.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Financial reporting of NASA... CONTRACT CLAUSES Texts of Provisions and Clauses 1852.245-73 Financial reporting of NASA property in the custody of contractors. As prescribed in 1845.106-70(d), insert the following clause: Financial Reporting...

  14. 22 CFR 226.14 - Special award conditions.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Special award conditions. 226.14 Section 226.14 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Pre-award Requirements § 226.14 Special award conditions. If an applicant or...

  15. 22 CFR 226.11 - Pre-award policies.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Pre-award policies. 226.11 Section 226.11 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Pre-award Requirements § 226.11 Pre-award policies. (a) Use of grants and...

  16. Mars Technologies Spawn Durable Wind Turbines

    Science.gov (United States)

    2014-01-01

    To develop and test wind power technology for use on Mars, Ames Research Center turned to Northern Power Systems (NPS), based in Barre, Vermont. Ames awarded NPS an SBIR contract so the company could enhance their turbine’s function. Today, over 200 NASA-derived Northern Power 100s are in operation on Earth and have reduced carbon emissions by 50,000 tons annually.

  17. 28 CFR 523.16 - Lump sum awards.

    Science.gov (United States)

    2010-07-01

    ... satisfactory performance of an unusually hazardous assignment; (c) An act which protects the lives of staff or... TRANSFER COMPUTATION OF SENTENCE Extra Good Time § 523.16 Lump sum awards. Any staff member may recommend... award is calculated. No seniority is accrued for such awards. Staff may recommend lump sum awards of...

  18. Contract Management of LHC Civil Engineering at Point 5

    CERN Document Server

    Osborne, J A

    1999-01-01

    Civil engineering work commenced in August 1998 at LEP Point 5 for the underground and surface works necessary to accommodate the CMS detector for the LHC project. The principal underground works consist of two parallel caverns, separated by a support pillar, two new shafts, a number of smaller connection and service galleries and tunnel enlargements on the existing LEP tunnel. The surface works consist of the 140 m long SX building for the detector assembly and numerous other steel and concrete structures necessary for the installation and operation of CMS. The civil engineering design and supervision has been awarded to a joint venture of Gibb (UK), SGI (Switzerland) and Geoconsult (Austria), and the contracting to a joint venture of Dragados (Spain) and Seli (Italy) for 112 MCHF. The aim of this paper is to discuss the management of this contract and in particular how the various parties interact in order to work most efficiently.

  19. Creativity Awards: Great Expectations?

    Science.gov (United States)

    Kilgour, Mark; Sasser, Sheila; Koslow, Scott

    2013-01-01

    Given the creativity inherent in advertising, one useful measure of creativity may be the advertising creativity award. Although creativity awards have been used by academics, agencies, and clients as indicators of exemplary creative work, there is surprisingly little research as to what creative elements they actually represent. Senior agency…

  20. Elsevier/Spectrochimica Acta atomic spectroscopy award 2015

    Science.gov (United States)

    Omenetto, Nicolo; de Loos-Vollebregt, Margaretha

    2016-12-01

    This is to announce the 2015 Elsevier/Spectrochimica Acta award, the annual award honoring the most significant article(s) published in a volume. Elsevier makes this award on behalf of Spectrochimica Acta, Part B, to encourage the publication of top articles in this journal. All papers published during one year are considered for this award and the Editorial Advisory Board and the Guest Editor(s) of the special issue(s) are responsible for the selection. The award consists of a monetary prize of 1000 together with a presentation certificate.

  1. Elsevier/Spectrochimica Acta Atomic Spectroscopy Award 2014

    Science.gov (United States)

    Omenetto, Nicolo'; de Loos, Greet

    2016-03-01

    This is to announce the 2014 Elsevier/Spectrochimica Acta Award, the annual award honoring the most significant article(s) published in a volume. Elsevier makes this award on behalf of Spectrochimica Acta, Part B, to encourage the publication of top articles in this journal. All papers published during one year are considered for this award and the Editorial Advisory Board and the Guest Editor(s) of the special issue(s) are responsible for the selection. The award consists of a monetary prize of 1000 together with a presentation certificate.

  2. NASA Johnson Space Center Small Business Innovation Research (SBIR) Successes, Infusion and Commercializations and Potential International Partnering Opportunities

    Science.gov (United States)

    Packard, Kathryn; Goodman, Doug; Whittington, James

    2016-01-01

    The NASA Small Business Innovation Research (SBIR) Program has served as a beneficial funding vehicle to both US small technology businesses and the Federal Agencies that participate in the program. This paper, to the extent possible, while observing Intellectual Property (IP) laws, will discuss the many SBIR and STTR (SBIR Technology Transfer) successes in the recent history of the NASA Johnson Space Center (JSC). Many of the participants of the International Conference on Environmental Systems (ICES) have based their research and papers on technologies that were made possible by SBIR/STTR awards and post award funding. Many SBIR/STTR successes have flown on Space Shuttle missions, Space X Dragons, and other spacecraft. SBIR/STTR technologies are currently infused on the International Space Station (ISS) and satellites, one of which was a NASA/JAXA (Japanese Space Agency) joint venture. Many of these companies have commercialized their technologies and grown as businesses while helping the economy through the creation of new jobs. In addition, this paper will explore the opportunity for international partnership with US SBIR/STTR companies as up to 49% of the makeup of the company is not required to be American owned. Although this paper will deal with technical achievements, it does not purport to be technical in nature. It will address the many requests for information on successes and opportunities within NASA SBIR and the virtually untapped potential of international partnering.

  3. MedlinePlus: Awards and Recognition

    Science.gov (United States)

    ... winner of the 2005 World Summit on the Information Society Awards for e-health. Winner of the Thomas Reuters/Frank Bradway Rogers Information Advancement Award in 2014 for MedlinePlus Connect and ...

  4. IDRC Doctoral Research Awards

    International Development Research Centre (IDRC) Digital Library (Canada)

    test

    Example of the letter required by IDRC: Reference: IDRC Awards competition: John Smith (Please indicate the title of the award.) a) As research supervisor of Mr. John Smith, I confirm that I approve and support the research proposal submitted by the candidate. b) Mr. Smith has successfully completed the following course(s):.

  5. Data Visualization and Storytelling: Students Showcasing Innovative Work on the NASA Hyperwall

    Science.gov (United States)

    Hankin, E. R.; Hasan, M.; Williams, B. M.; Harwell, D. E.

    2017-12-01

    Visual storytelling can be used to quickly and effectively tell a story about data and scientific research, with powerful visuals driving a deeper level of engagement. In 2016, the American Geophysical Union (AGU) launched a pilot contest with a grant from NASA to fund students to travel to the AGU Fall Meeting to present innovative data visualizations with fascinating stories on the NASA Hyperwall. This presentation will discuss the purpose of the contest and provide highlights. Additionally, the presentation will feature Mejs Hasan, one of the 2016 contest grand prize winners, who will discuss her award-winning research utilizing Landsat visual data, MODIS Enhanced Vegetation Index data, and NOAA nightlight data to study the effects of both drought and war on the Middle East.

  6. Evaluating the Effectiveness of NASA's Destination Tomorrow(Trademark) 2000-2001 Program

    Science.gov (United States)

    Pinelli, Thomas E.; Perry, Jeannine

    2002-01-01

    NASA's Destination Tomorrow(trademark) series consists of 30-minute educational television programs that focus on NASA research, past, present, and future and are designed for educators, parents, and adult (lifelong) learners. Programs in this award-winning series follow a magazine style format with segments ranging from 3-5 minutes to 6-8 minutes. An associated web site provides summaries of stories and links to related program material. The development of the programs is based on educational theory, principles, and research as they pertain to how adults learn and apply knowledge. The five programs in the 2000-2001 season were produced in English and dubbed in Spanish. Telephone interviews with managers of cable access television stations were conducted in January 2002. NASA's Destination Tomorrow(trademark) interviewees reported that (1) from a programming standpoint, the most appealing aspects of the series are its production quality and educational value, (2) programs in the series are 'better than average' when compared to other education programming, (3) the programs are very credible, (4) the programs are successful in educating people about what NASA does, and (5) the programs have been 'very well received' by their audiences.

  7. Overview of the NASA/RECON educational, research, and development activities of the Computer Science Departments of the University of Southwestern Louisiana and Southern University

    Science.gov (United States)

    Dominick, Wayne D. (Editor)

    1984-01-01

    This document presents a brief overview of the scope of activities undertaken by the Computer Science Departments of the University of Southern Louisiana (USL) and Southern University (SU) pursuant to a contract with NASA. Presented are only basic identification data concerning the contract activities since subsequent entries within the Working Paper Series will be oriented specifically toward a detailed development and presentation of plans, methodologies, and results of each contract activity. Also included is a table of contents of the entire USL/DBMS NASA/RECON Working Paper Series.

  8. Managing the training process: contracting for training services

    International Nuclear Information System (INIS)

    Carlson, E.R.

    1985-01-01

    The need for using consultants and contracting for training services should be based on one or more of these three major reasons: the need to expand capability on a crash basis, the need for specialized expertise, and the need for objectivity, and independence. When the need for using a consultant exists, the training manager must first define the scope of work or services the consultant is to provide and how the consultant will interface with the training staff. The next step will be to develop a Request for Proposal which involves management, training staff, and contract services organizations. The critical parts of an RFP are scope and schedule. Consideration would be given to determining which consultant organizations should receive the RFP, and specifying who is on the bidders list. The third step will consist of evaluating the proposals and awarding the work. This step needs to be objective, defendable, and repeatable. The final phase will be the performance of the work. The activities included are project initiation, monitoring contractor performance, and formal conclusion

  9. Michael Tomasello: Award for Distinguished Scientific Contributions.

    Science.gov (United States)

    2015-11-01

    The APA Awards for Distinguished Scientific Contributions are presented to persons who, in the opinion of the Committee on Scientific Awards, have made distinguished theoretical or empirical contributions to basic research in psychology. One of the 2015 award winners is Michael Tomasello, who received this award for "outstanding empirical and theoretical contributions to understanding what makes the human mind unique. Michael Tomasello's pioneering research on the origins of social cognition has led to revolutionary insights in both developmental psychology and primate cognition." Tomasello's award citation, biography, and a selected bibliography are presented here. (c) 2015 APA, all rights reserved).

  10. CMS Thesis Award

    CERN Multimedia

    2004-01-01

    The 2003 CMS thesis award was presented to Riccardo Ranieri on 15 March for his Ph.D. thesis "Trigger Selection of WH → μ ν b bbar with CMS" where 'WH → μ ν b bbar' represents the associated production of the W boson and the Higgs boson and their subsequent decays. Riccardo received his Ph.D. from the University of Florence and was supervised by Carlo Civinini. In total nine thesis were nominated for the award, which was judged on originality, impact within the field of high energy physics, impact within CMS and clarity of writing. Gregory Snow, secretary of the awarding committee, explains why Riccardo's thesis was chosen, ‘‘The search for the Higgs boson is one of the main physics goals of CMS. Riccardo's thesis helps the experiment to formulate the strategy which will be used in that search.'' Lorenzo Foà, Chairperson of the CMS Collaboration Board, presented Riccardo with an commemorative engraved plaque. He will also receive the opportunity to...

  11. Proposal to negotiate, without competitive tendering, a blanket contract for an instant-reading dosimeter system

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply, installation and maintenance of an instant-reading dosimeter system. Following a market survey (MS-3118/TIS) carried out among 28 firms in eleven Member States, a request for a quotation was sent to one firm on 3 October 2003. The Finance Committee is invited to agree to the negotiation of a blanket contract, without competitive tendering, with RADOS TECHNOLOGY (FI) for the supply, installation and maintenance of an instant-reading dosimeter system for a total amount not exceeding 2 100 000 euros (3 252 284 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FI - 58%; CH - 38%; GB - 4%.

  12. Newly established AGU awards and lecture

    Science.gov (United States)

    Paredes, Beth; Kumar, Mohi

    2012-05-01

    The Sulzman Award for Excellence in Education and Mentoring (Biogeosciences section) recognizes AGU members who have sustained an active research career in a field related to biogeosciences while excelling as teachers and serving as role models for the next generation of female scientists. This new award acknowledges the importance of female mentors in enhancing gender balance in physical science career paths. The award is being endowed to honor Elizabeth Sulzman, an isotope biogeochemist and soil scientist, whose enthusiasm for teaching awed many undergraduates at Oregon State University. Current plans are to present the first Sulzman award at the 2013 Fall Meeting. Applicants must be women who are within 15 years of receiving their Ph.D., and nomination packages should include a cover letter, resumé, and three letters of recommendation. As they become available, more details will be posted on the Biogeosciences section Web site (http://www.agu.org/sections/biogeo/). The award will provide up to $1000 to one successful nominee each year, although the exact monetary amount is yet to be determined. AGU is currently accepting donations to endow this award; contact Victoria Thompson (vthompson@agu.org) to get involved.

  13. 48 CFR 1552.216-77 - Award term incentive.

    Science.gov (United States)

    2010-10-01

    ... award term incentive periods] years. (c) Right not to grant or cancel the award term incentive. (1) The Government has the unilateral right not to grant or to cancel award term incentive periods and the associated... the award term incentive is cancelled, a unilateral modification will cite this clause as the...

  14. Proposal for the Award of a Blanket Order for the Supply of Office Furniture

    CERN Document Server

    1999-01-01

    This document concerns the award of a blanket order for the supply of office furniture. Following a market survey carried out among 87 firms in seventeen Member States, a call for tenders (IT-2590/SPL) was sent on 5 November 1998 to nine firms in four Member States. By the closing date, CERN had received seven tenders. The Finance Committee is invited to agree to the negotiation of a contract for the supply of office furniture with the company A+Z Bürosysteme (DE), the lowest bidder complying with the specification, up to a total amount of 1 600 000 Swiss francs, not subject to revision until 30 March 2000, for an initial period of three years, with an option to renew the contract for two further one-year periods. A+Z Bürosysteme has declared the following origin of the furniture covered by this adjudication proposal: DE - 90% and CH - 10%.

  15. Environmental Protection Agency Award Recipient Responsibilities

    Science.gov (United States)

    Itemized Award Phase information. Information about the Recipient's Responsibilities Upon Notification of the Award, The EPA Project Officer Responsibilities, and EPA Grant Specialists Responsibilities.

  16. Step 4: Award Negotiation & Issuance

    Science.gov (United States)

    Before a grant can be awarded and accepted, several pre-award activities must happen to formalize the partnership. Ensuring compliance with federal laws, a review of costs and a negotiation of the appropriate funding level must all happen in order to rece

  17. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  18. The Defense Logistics Agency Properly Awarded Power Purchase Agreements and the Army Obtained Fair Market Value for Leases Supporting Power Purchase Agreements

    Science.gov (United States)

    2016-09-28

    response to an allegation reported to the Defense Hotline. The allegation stated that the Army and Navy leased land to utility companies to produce...awarded the two power purchase agreements at Fort Hood and Fort Detrick, using full and open competition, in accordance with Federal and DoD guidance...Specifically, the contracting officials properly issued requests for proposals, developed source selection plans, and evaluated proposals in

  19. The 2004 NASA Faculty Fellowship Program Research Reports

    Science.gov (United States)

    Pruitt, J. R.; Karr, G.; Freeman, L. M.; Hassan, R.; Day, J. B. (Compiler)

    2005-01-01

    This is the administrative report for the 2004 NASA Faculty Fellowship Program (NFFP) held at the George C. Marshall Space Flight Center (MSFC) for the 40th consecutive year. The NFFP offers science and engineering faculty at U.S. colleges and universities hands-on exposure to NASA s research challenges through summer research residencies and extended research opportunities at participating NASA research Centers. During this program, fellows work closely with NASA colleagues on research challenges important to NASA's strategic enterprises that are of mutual interest to the fellow and the Center. The nominal starting and .nishing dates for the 10-week program were June 1 through August 6, 2004. The program was sponsored by NASA Headquarters, Washington, DC, and operated under contract by The University of Alabama, The University of Alabama in Huntsville, and Alabama A&M University. In addition, promotion and applications are managed by the American Society for Engineering Education (ASEE) and assessment is completed by Universities Space Research Association (USRA). The primary objectives of the NFFP are to: Increase the quality and quantity of research collaborations between NASA and the academic community that contribute to the Agency s space aeronautics and space science mission. Engage faculty from colleges, universities, and community colleges in current NASA research and development. Foster a greater public awareness of NASA science and technology, and therefore facilitate academic and workforce literacy in these areas. Strengthen faculty capabilities to enhance the STEM workforce, advance competition, and infuse mission-related research and technology content into classroom teaching. Increase participation of underrepresented and underserved faculty and institutions in NASA science and technology.

  20. 76 FR 16630 - Announcement of an Award

    Science.gov (United States)

    2011-03-24

    ... Development announces the award of a cooperative agreement with the Congressional Hunger Center (CHC) in Washington, DC, to work with ACF programs on hunger and obesity issues for young children. An award in the... Children and Families (ACF) announces the award of a cooperative agreement to the Congressional Hunger...

  1. Two awards for Herwig Schopper

    CERN Multimedia

    2004-01-01

    Former CERN Director-General Herwig Schopper has received two prestigious awards, from UNESCO and from the American Institute of Physics. Herwig Schopper receives the UNESCO Albert Einstein Gold Medal from Koïchiro Matsuura, Director-General of UNESCO. Without any great fanfare, Herwig Schopper has just received two major awards. UNESCO awarded him the Albert Einstein Gold Medal in Paris on 15 April, while on 2 May in Denver the American Institute of Physics (AIP) presented him with the Tate Medal for International Leadership in Physics (together with a USD 10 000 prize). Both awards were in recognition of Herwig Schopper's pivotal role in the construction of international scientific cooperation. Today President of the SESAME Council - the International Centre for Synchrotron Light for Experimental Science and Applications in the Middle East (see Bulletin No. 26/2003) - Herwig Schopper was Director-General of CERN from 1981 to 1988. President of the European Physical Society from 1994 to 1996, he wa...

  2. Notification: Evaluation of EPA's Green Chemistry Challenge Awards and Use of Data from the Award Results

    Science.gov (United States)

    Project #OPE-FY18-0003, January 9, 2018. The OIG plans to begin preliminary research to evaluate the agency's Presidential Green Chemistry Challenge Awards and how the agency uses the data from the award nominations.

  3. 17 CFR 201.59 - Payment of award.

    Science.gov (United States)

    2010-04-01

    ... as authorized by law, unless judicial review of the award has been sought by the applicant. [54 FR... Regulations Pertaining to the Equal Access to Justice Act § 201.59 Payment of award. An applicant seeking... decision granting the award, accompanied by a sworn statement that the applicant will not seek review of...

  4. 22 CFR 134.30 - Payment of award.

    Science.gov (United States)

    2010-04-01

    ... will pay the amount awarded to the applicant within 60 days, unless judicial review of the award or of... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Payment of award. 134.30 Section 134.30 Foreign Relations DEPARTMENT OF STATE MISCELLANEOUS EQUAL ACCESS TO JUSTICE ACT; IMPLEMENTATION Procedures for...

  5. 5 CFR 2610.311 - Payment of award.

    Science.gov (United States)

    2010-01-01

    ... THE EQUAL ACCESS TO JUSTICE ACT Procedures for Considering Applications § 2610.311 Payment of award..., Suite 500, 1201 New York Avenue NW., Washington, DC 20005-3917. The Office will pay the amount awarded to the applicant within 60 days, unless judicial review of the award or of the underlying decision of...

  6. QUALITY AWARDS: AN IMAGE OF BUSINESS EXCELLENCE

    Directory of Open Access Journals (Sweden)

    Ilies Liviu

    2015-07-01

    Full Text Available Across the world, increasingly more governmental organizations and industrial are doing everything possible to promote quality and to survive, the basic principle remains customer satisfaction and even more than that, it speaks of the principle of customer delight. In this sense, quality has become the source of sustained competitive advantage that provides organizations the supremacy of the global markets characterized by competition which becoming more and more intensified. Juran, one of the highest quality gurus say that “just as the twentieth century was the century of productivity, the twenty-first century will be the quality century” which is a very relevant and comprehensive statement of the economic reality of the past and a profound forecast for future business of the twenty-first century. In this regard, in order to achieve this competitive advantage, quality must be managed and this is accomplished through Total Quality Management (TQM. Quality awards models are instruments of total quality management through which quality can be assessed and improved, thus, knowing the quality awards models is critical for findings the new ways to improve the quality and performance of the organizations. The present paper aims to illustrate the best practices on quality improvement in this respect we intend to present the general framework of the quality awards for business excellence. In this sense we present the most important international quality awards, namely: "Malcolm Baldrige National Quality Award", "European Quality Award" and “Romanian Quality Award J. M. Juran". For this purpose we used as main sources of analyzing the structure and the operation mode of these three important quality awards, Juran's work (which is probably the most important work in the field of quality and other relevant sources in total quality management which treats issues related to quality awards and also we used as sources of updated information the official

  7. 31 CFR 7.6 - Effect of awards.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Effect of awards. 7.6 Section 7.6 Money and Finance: Treasury Office of the Secretary of the Treasury EMPLOYEE INVENTIONS § 7.6 Effect of awards. The acceptance by an employee of a cash award for performance which constitutes an invention...

  8. R&D 100 Awards Honor NREL Research

    Science.gov (United States)

    R&D 100 Awards Honor NREL Research For more information contact: George Douglas 303-275-4096 e National Renewable Energy Laboratory will be honored Thursday with two R&D 100 awards. The awards are given each year by the editors of R&D Magazine for what they consider to be among the year's 100

  9. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  10. The NASA Global Climate Change Education Project: An Integrated Effort to Improve the Teaching and Learning about Climate Change (Invited)

    Science.gov (United States)

    Chambers, L. H.; Pippin, M. R.; Welch, S.; Spruill, K.; Matthews, M. J.; Person, C.

    2010-12-01

    The NASA Global Climate Change Education (GCCE) Project, initiated in 2008, seeks to: - improve the teaching and learning about global climate change in elementary and secondary schools, on college campuses, and through lifelong learning; - increase the number of people, particularly high school and undergraduate students, using NASA Earth observation data, Earth system models, and/or simulations to investigate and analyze global climate change issues; - increase the number of undergraduate students prepared for employment and/or to enter graduate school in technical fields relevant to global climate change. Through an annual solicitation, proposals are requested for projects that address these goals using a variety of approaches. These include using NASA Earth system data, interactive models and/or simulations; providing research experiences for undergraduate or community college students, or for pre- or in-service teachers; or creating long-term teacher professional development experiences. To date, 57 projects have been funded to pursue these goals (22 in 2008, 18 in 2009, and 17 in 2010), each for a 2-3 year period. The vast majority of awards address either teacher professional development, or use of data, models, or simulations; only 7 awards have been made for research experiences. NASA, with assistance from the Virginia Space Grant Consortium, is working to develop these awardees into a synergistic community that works together to maximize its impact. This paper will present examples of collaborations that are evolving within this developing community. It will also introduce the opportunities available in fiscal year 2011, when a change in emphasis is expected for the project as it moves within the NASA Office of Education Minority University Research and Education Program (MUREP).

  11. CoC Awards by Program Component

    Data.gov (United States)

    Department of Housing and Urban Development — CoC Awards by Program Component reports provide snapshots of award data broken down by eligible program component types for the year selected. The reports, which can...

  12. 7th Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    Science.gov (United States)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership' provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processess, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission. The conference was highlighted by the announcement of the first recipients of the George M. Low Trophy: NASA's Quality and Excellence Award. My congratulations go out to all nine finalist organizations and to the two recipients of this prestigious honor: Rockwell Space Systems Division and Marotta Scientific Controls, Inc. (the first small business to achieve this honor). These organizations have demonstrated a commitment to quality that is unsurpassed in the aerospace industry. This report summarizes the presentations and is not intended to be a verbatim proceedings document. You are encouraged to contact the speakers with any requests for further information.

  13. A new award for the CERN Pension Fund

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    Recently, the CERN Pension Fund was awarded the 2013 Investment and Pensions Europe (IPE) Award for “Best Use of Equities”. IPE is the leading European Pension Fund industry publication.   The award recognized CERN’s implementation of capital preservation principles in equities, referring in particular to CERN’s innovation with the development of “asymmetric” equity strategies. The awards were judged by a panel of 65 European pension fund executives, experts and consultants. In addition, CERN was selected by the judges as a finalist for “Best Public Pension Fund” in Europe.  This award was won by the UK government’s Pension Protection Fund.

  14. 12 CFR 1806.204 - Applications for Bank Enterprise Awards.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Applications for Bank Enterprise Awards. 1806... OF THE TREASURY BANK ENTERPRISE AWARD PROGRAM Awards § 1806.204 Applications for Bank Enterprise... Enterprise Awards in accordance with this section and the applicable NOFA. After receipt of an application...

  15. An overview of the USL/DBMS NASA/PC R and D project working paper series

    Science.gov (United States)

    Dominick, Wayne D. (Editor)

    1984-01-01

    An introduction is given to the University of Southwestern Louisiana Data Base Management System (USL/DBMS) NASA/PC R and D Working Paper Series which has been established to provide a foundation for both a formal and informal information dissemination mechanism concerning PC-based research and development activities being performed pursuant to the NASA contract. This entry also serves as an index to the collection of Working Paper Series reports.

  16. NASA Technology Demonstrations Missions Program Overview

    Science.gov (United States)

    Turner, Susan

    2011-01-01

    , more than 70% of the TDM funds will be competitively awarded as a result of yearly calls for proposed flight demonstrators and selected based on possible payoff to NASA, technology maturity, customer interest, cost, and technical risk reduction. This paper will give an overview of the TDM Program s mission and organization, as well as its current status in delivering advanced space technologies that will enable more flexible and robust future missions. It also will provide several examples of missions that fit within these parameters and expected outcomes.

  17. Contracting for nurse education: nurse leader experiences and future visions.

    Science.gov (United States)

    Moule, P

    1999-02-01

    The integration of nurse education into higher education establishments following Working for Patients, Working Paper 10 (DOH 1989a) has seen changes to the funding and delivery of nurse education. The introduction of contracting for education initiated a business culture which subsumed previous relationships, affecting collaborative partnerships and shared understanding. Discourse between the providers and purchasers of nurse education is vital to achieve proactive curriculum planning, which supports the development of nursing practitioners who are fit for award and fit for purpose. Research employed philosophical hermeneutics to guide the interviewing of seven nurse leaders within one region. Data analysis occurred within a hermeneutic circle and was refined using NUDIST. Two key themes were seen as impacting on the development of an effective educational strategy. Firstly, the development of collaborative working was thought to have been impeded by communication difficulties between the Trusts and higher education provider. Secondly, there was concern that curriculum developments would support the future evolution of nursing, acknowledging the professional issues impacting on nursing roles. The research findings suggest purchasers and providers of nurse education must move towards achieving mutual understanding and collaborate in developing a curriculum which will prepare nurses for practice and for award.

  18. 49 CFR 663.23 - Description of pre-award audit.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Description of pre-award audit. 663.23 Section 663.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PRE-AWARD AND POST-DELIVERY AUDITS OF ROLLING STOCK PURCHASES Pre-Award Audits § 663.23 Description of pre-award...

  19. Special awards lighten up SPR banquet

    Science.gov (United States)

    Zwickl, Ron; Baker, Dan; Reiff, Pat

    On December 8, 1982, Marcia Neugebauer, then president of the Solar and Planetary Relationships section, held the “First Occasional Awards Ceremony” in conjunction with the annual dinner banquet at the Fall AGU meeting. These awards were an attempt to add a little humor to our usually somber gatherings. This year we reincarnated Neugebauer's successful concept and presented a number of new and novel awards to our fellow scientists at the Fall AGU SPR dinner. Summarized for your enjoyment are the categories and the official winners, as announced at the December 6 banquet.

  20. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  1. Public contracts by negotiated procedure in cases of urgency – a new interpretation of the legal basis in light of experiences with organization of the 2012 European Football Championships

    Directory of Open Access Journals (Sweden)

    Krzysztof Horubski

    2013-06-01

    Full Text Available The negotiated procedure without publication of a contract notice is a special procedure for awarding public procurement contracts which departs from the obligation imposed on contracting authorities of respecting the freedoms of the internal market and rules of competition. The procedure may be applied in exceptional situations of extreme urgency resulting from an event which could not be foreseen. The current judicature of the Court of Justice of the EU provides interpretations of the legal basis for application of the procedure in specific cases. However, it does not address the issue of whether it is possible to regard improper performance of contractual obligations as unpredictable. It does not provide broader considerations concerning the form of regulations on the procedure of awarding public interest contracts either. These issues were subject to analysis in one of the resolutions of the National Appeal Chamber (KIO – the Polish authority issuing decisions in matters related to public procurement contracts. In resolution KIO/KD 58/10 of 6 August 2010, KIO assessed the correctness of the application of the negotiated procedure for changing the contractor of the Municipal Stadium in Wrocław in the run-up to the 2012 European Football Championships. KIO found that the significant delay in construction of the facility was unpredictably exceptional, and significantly threatened the timeliness of commissioning the facility, which resulted in termination of the agreement by the contracting authority. The resolution also included an assessment allowing for the position that such a situation was exceptional due to the scale of the threat to the public interest, including the commercial interest of the contracting authority, stemming from a lack of immediate performance of the contract if it resulted in disproportionate consequences for a specific community. The issue of acceptance of such an interpretation by EU institutions remains unresolved.

  2. Economist Innovation Award for Tim Berners-Lee

    CERN Multimedia

    2003-01-01

    In September, Tim Berners-Lee, who invented the World Wide Web at CERN and is now Director of the W3C World Wide Web Consortium, received the 2nd Economist Annual Innovation Award in Computing. With the award The Economist, a British weekly newspaper, recognises individuals responsible for breakthroughs in Bioscience, Computing, Energy and the Environment, and Telecommunications that have a profound impact on industry. A fifth award is given in a special "No Boundaries" category, observing innovation that transcends industries. Candidates for the awards are proposed by The Economist readers and writers, and by a group of judges. Tim Berners-Lee received the Computing award for his global hypertext project, to be known as the World Wide Web, which "forever altered the way information is shared" and is a huge contribution to the efficiency of the scientific community. Based on a programme for storing information using random associations called "Enquire", it...

  3. Tables Summarizing Awards Supported by IDRC

    International Development Research Centre (IDRC) Digital Library (Canada)

    Carole Labrie

    2013-04-04

    International Development Research Centre (IDRC). A. Awards Granted Through Competitions. Updated April 4, 2013. Award Type. University Level. Who can apply. Description. Frequency & ... Explore a problem common to First Nations or Inuit. Communities of Canada ... reporting in one or more developing countries.

  4. The BINP receives its Golden Hadron award

    CERN Multimedia

    2002-01-01

    On Thursday, 14 September, the LHC Project Leader, Lyn Evans, handed over a Golden Hadron award to Alexander Skrinsky of Russia's Budker Institute of Nuclear Physics (BINP). The prize is awarded in recognition of exceptional performances by suppliers and this year prizes were awarded to two firms, Cockerill-Sambre (Belgium) and Wah-Chang (United States), and to the Budker Institute, which was unable to receive the award at the same time as the two other recipients (see Bulletin No 34/2002, of 19 August 2002). The Russian institute has been rewarded for the particularly high-quality production of 360 dipole magnets and 185 quadrupole magnets for the LHC proton beam transfer lines.

  5. A Herdswoman Awarded with Global Medal

    Institute of Scientific and Technical Information of China (English)

    FLORA; CHANG

    1998-01-01

    SEPTEMBER 8, 1995 was an unforgettable day for Lai Xiao. On that morning, she was awarded with the "Global Rural Women Creation of Life Award" by the NGO Forum of the UN Fourth World Conference on Women, in Huairou, Beijing. Wearing sapphire-blue Mongolian attire,

  6. Three scientists to receive presidential Enrico Fermi award

    CERN Multimedia

    2003-01-01

    "Secretary of Energy Spencer Abraham today named John Bahcall, Raymond Davis, Jr. and Seymour Sack as winners of the Enrico Fermi Award. ... Drs. Bahcall and Davis will receive the award for their research in neutrino physics. Dr. Sack will receive the award for his contributions to national security" (1 page).

  7. The Heliopause Electrostatic Rapid Transit System (HERTS) - Design, Trades, and Analyses Performed in a Two Year NASA Investigation of Electric Sail Propulsion Systems

    Science.gov (United States)

    Wiegmann, Bruce M.; Scheider, Todd; Heaton, Andrew; Vaughn, Jason; Stone, Nobie; Wright, Ken

    2017-01-01

    Personnel from NASA's MSFC have been investigating the feasibility of an advanced propulsion system known as the Electric Sail (E-Sail) for future scientific exploration missions. This team initially won a NASA Space Technology Mission Directorate (STMD) Phase I NASA Innovative Advanced Concept (NIAC) award and then a two-year follow-on Phase II NIAC award in October 2015. This paper documents the findings from this three-year investigation. An Electric sail, a propellant-less propulsion system, uses solar wind ions to rapidly travel either to deep space or the inner solar system. Scientific spacecraft could reach Pluto in 5 years, or the boundary of the solar system in ten to twelve years compared to the thirty-five plus years the Voyager spacecraft took. The team's recent focuses have been: 1) Developing a Particle in Cell (PIC) numeric engineering model from MSFC's experimental data on the interaction between simulated solar wind and a charged bare wire that can be applied to a variety of missions, 2) Determining what missions could benefit from this revolutionary propulsion system, 3) Conceptualizing spacecraft designs for various tasks: to reach the solar system's edge, to orbit the sun as Heliophysics sentinels, or to examine a multitude of asteroids.

  8. ALICE gives its first thesis awards

    CERN Multimedia

    2008-01-01

    For the first time the ALICE collaboration has given two of its doctoral students awards for their outstanding theses. Winners Christian Holm Christensen and Zaida Conesa del Valle holding their awards.On 29 October the ALICE collaboration honoured two students for their outstanding theses at a ceremony held at CERN. The two awards, one of which was given for a physics thesis and the other for a technical thesis, went to Zaida Conesa Del Valle (Laboratoire de physique subatomique et des technologies associées) and Christian Holm Christensen (Niels Bohr Institute) respectively. "It is very gratifying to see that the collaboration appreciates our work," said Zaida Conesa del Valle, winner of the physics award for her thesis: Performance of the ALICE Muon Spectrometer. Weak Boson Production and Measurement in Heavy Ion Collisions at the LHC. "I also feel specially thankful to all the people who worked with me," she added. "It was pl...

  9. The Post-Award Costs of Contracting Out: The U.S. Navy’s Implementation of OMB Circular A-76

    Science.gov (United States)

    1988-06-01

    Commercial Activities (CA) Program Update, 6 April 1987. 4. Horngren , C.T. and Foster, G., Cost Accounting : A Managerial Emphasis, 6th Ed., Prentice-Hall... COSTS OF CONTRACTING OUT: THE U.S. NAVY’S IMPLEMENTATION OF OMB CIRCULAR A-76 12 PERSONAL AUTHOR( S ) Cole. Nancy S . and Cnlp Charla P 13a TYPE OF...of contracting out and identifies those costs that are either underestimated or not accounted for in the cost comparison process. Research was

  10. 48 CFR 1819.7208 - Award Fee Pilot Program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Award Fee Pilot Program... Pilot Program. (a) Mentors will be eligible to earn a separate award fee associated with the provision... related to the mentor-protégé relationship. (d) The Award Fee Pilot Program is an addition to the credit...

  11. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  12. General specifications for the development of a PC-based simulator of the NASA RECON system

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Triantafyllopoulos, Spiros

    1984-01-01

    The general specifications for the design and implementation of an IBM PC/XT-based simulator of the NASA RECON system, including record designs, file structure designs, command language analysis, program design issues, error recovery considerations, and usage monitoring facilities are discussed. Once implemented, such a simulator will be utilized to evaluate the effectiveness of simulated information system access in addition to actual system usage as part of the total educational programs being developed within the NASA contract.

  13. Innovative Catalytic Converter Wins National Award

    Science.gov (United States)

    emissions and urban air pollution has been named one of the years most important technological breakthroughs National Renewable Energy Laboratory (NREL) and Benteler Industries Inc. of Grand Rapids, Mich.—to receive one of its prestigious 1996 R&D 100 awards. The annual awards recognize the years 100 most

  14. 5 CFR 534.405 - Performance awards.

    Science.gov (United States)

    2010-01-01

    ... one-half of the membership of a Performance Review Board must be career SES appointees. The only...) This section covers the payment of performance awards to career appointees in the Senior Executive Service (SES). (1) To be eligible for an award, the individual must have been an SES career appointee as...

  15. 2 CFR 175.15 - Award term.

    Science.gov (United States)

    2010-01-01

    ... iii. Use forced labor in the performance of the award or subawards under the award. 2. We as the... cost sharing or matching requirements. 2. “Forced labor” means labor obtained by any of the following methods: the recruitment, harboring, transportation, provision, or obtaining of a person for labor or...

  16. Awards for high-energy physics at CERN

    CERN Multimedia

    2005-01-01

    Dave Barney of CMS with the Outreach Prize awarded by the European Physical Society. The European Physical Society (EPS) has awarded two prizes to CERN physicists. Dave Barney of CMS shared his Outreach Prize with Peter Kalmus of Queen Mary, University of London. This prize is awarded for communicating particle physics to the public. The NA31 collaboration and its spokesman, Heinrich Wahl, received the 2005 High Energy and Particle Physics Prize for their work on CP violation undertaken at CERN.

  17. Awards and honours

    CERN Multimedia

    2009-01-01

    President of the Italian Republic, Giorgio Napolitano, presenting Fabiola Gianotti with her award on 7 March.On the occasion of International Woman’s Day on 7 March, Fabiola Gianotti, ATLAS spokesperson, was awarded "Commendatore della Repubblica Italiana" by the Italian President for her "scientific knowledge and her excellent management skills demonstrated in guiding the ATLAS project". Gianotti received the honorary title also for "her contribution to the prestige of the Italian scientific community in the field of nuclear physics." Further reading (in Italian only): http://www.quirinale.it/Comunicati/Comunicato.asp?id=38192 An article about the beginning of Gianotti’s term of office as ATLAS spokesperson is available from the latest issue of the CERN Courier: http://cerncourier.com/cws/article/cern/38709

  18. 42 CFR 52.6 - Grant awards.

    Science.gov (United States)

    2010-10-01

    ... grant to those applicants whose approved projects will in the Secretary's judgment best promote the..., the grant will initially be for one year and subsequent continuation awards will also be for one year... application nor the award of any grant commits or obligates the United States in any way to make any...

  19. Hero Award

    Centers for Disease Control (CDC) Podcasts

    2009-10-07

    This podcast is a lecture given by William H. Foege, MD, MPH when he was honored October 7, 2009 as the 2009 CDC Foundation Hero Award Recipient.  Created: 10/7/2009 by Centers for Disease Control and Prevention (CDC).   Date Released: 10/22/2009.

  20. Procedures Manual: A Guide to Uniform Grant and Contract Management Standards and The Common Rule for Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.

    Science.gov (United States)

    Conable, Sharon R.

    This manual has been compiled to provide consistent grant application and administrative procedures for state agencies which award grants or contracts to local governments. It provides a conceptual framework of information concerning the reporting, financial, contractual, and auditing requirements for recipients of Texas State Library grants…

  1. First CMS awards ceremony of 2003 to honour its top suppliers

    CERN Multimedia

    2003-01-01

    Each year CMS holds an awards ceremony to honour its top suppliers. This year 12 companies are receiving awards for their outstanding performances, eight the Gold Award and four the most prestigious award, the Crystal Award. The main ceremony will take place on 24 February during CMS week at CERN. However, one of the recipients of the Gold Award, the Snezhinsk All-Russian Institute of Scientific Research for Technical Physics (VNIITF) of the Russian Federal Nuclear Centre (RFNC) has already received its award. Felicitas Pauss, Vice-Chairman of the CMS Collaboration Board, hands a Gold Award for best CMS supplier to Professor Georgy Rykovanov, Director of Russia's RFNC-VNIITF Institute.The CMS Collaboration took the opportunity of the visit to CERN of the Director of the VNIITF and his deputy to make the award. which the Institute has received for its exceptional performance in the assembly of steel plates for the CMS's forward hadronic calorimeter. This calorimeter consists of two sets of 18 wedge-shape modul...

  2. Golden Hadron awards for the LHC's top suppliers.

    CERN Multimedia

    Maximilien Brice

    2003-01-01

    The following firms have been selected to receive a GOLDEN HADRON AWARD 2003, in recognition of their outstanding achievement: JDL TECHNOLOGIES, Belgium "in producing automatic cable inspection systems", FURUKAWA ELECTRIC COMPANY, Japan "in producing high quality superconducting cable", IHI Corporation, Japan, and LINDE KRYOTECHNIK, Switzerland "in producing novel 1.8 K refrigeration units based on advanced cold compressor technology" for the Large Hadron Collider.Photos 01, 02: Recipients of the 2003 Golden Hadron awards at the presentation ceremony on 16 May.Photo 03: LHC project leader Lyn Evans updates the award recipients on work for CERN's new accelerator.Photo 04: René Joannes of JDL Technologies (left) receives a Golden Hadron award from LHC project leader Lyn Evans.Shinichiro Meguro, managing director of Furukawa Electric Company, receives a Golden Hadron award from LHC project leader Lyn Evans.Photo 06: Kirkor Kurtcuoglu of Linde Kryotechnik (left) and Motoki Yoshinaga, associate director of IHI...

  3. Investment in Open Innovation Service Providers: NASA's Innovative Strategy for Solving Space Exploration Challenges

    Science.gov (United States)

    Fogarty, Jennifer A.; Rando, Cynthia; Baumann, David; Richard, Elizabeth; Davis, Jeffrey

    2010-01-01

    In an effort to expand routes for open communication and create additional opportunities for public involvement with NASA, Open Innovation Service Provider (OISP) methodologies have been incorporated as a tool in NASA's problem solving strategy. NASA engaged the services of two OISP providers, InnoCentive and Yet2.com, to test this novel approach and its feasibility in solving NASA s space flight challenges. The OISPs were chosen based on multiple factors including: network size and knowledge area span, established process, methodology, experience base, and cost. InnoCentive and Yet2.com each met the desired criteria; however each company s approach to Open Innovation is distinctly different. InnoCentive focuses on posting individual challenges to an established web-based network of approximately 200,000 solvers; viable solutions are sought and granted a financial award if found. Based on a specific technological need, Yet2.com acts as a talent scout providing a broad external network of experts as potential collaborators to NASA. A relationship can be established with these contacts to develop technologies and/or maintained as an established network of future collaborators. The results from the first phase of the pilot study have shown great promise for long term efficacy of utilizing the OISP methodologies. Solution proposals have been received for the challenges posted on InnoCentive and are currently under review for final disposition. In addition, Yet2.com has identified new external partners for NASA and we are in the process of understanding and acting upon these new opportunities. Compared to NASA's traditional routes for external problem solving, the OISP methodologies offered NASA a substantial savings in terms of time and resources invested. In addition, these strategies will help NASA extend beyond its current borders to build an ever expanding network of experts and global solvers.

  4. Charles L. Brewer Award for Distinguished Teaching of Psychology

    Science.gov (United States)

    American Psychologist, 2009

    2009-01-01

    The American Psychological Foundation (APF) Charles L. Brewer Distinguished Teaching of Psychology Award recognizes an outstanding career contribution to the teaching of psychology. The 2009 recipient of the Distinguished Teaching Award is William Buskist. Dorothy W. Cantor, president of the APF, will present the APF Teaching Award at the 117th…

  5. 48 CFR 922.608-4 - Award pending final determination.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Award pending final determination. 922.608-4 Section 922.608-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY....608-4 Award pending final determination. (a) Award, as contemplated by FAR 22.608-4, may be made only...

  6. Recipients of major scientific awards: A descriptive and predictive analysis

    Science.gov (United States)

    Barbee, Andrew Calvin

    Recent trends demonstrate an increase of women in leadership roles, STEM fields, and participating in higher education including graduate and doctoral programs, which is a result of Title IX. This quantitative study considered major scientific awards awarded to females and examines demographic characteristics of awardees from the Nobel, National Academy of Sciences (NAS), and National Science Foundation (NSF). More specifically, the following awards were examined the Nobel Prize in Chemistry, the NAS Public Welfare Medal, and the NSF National Medal of Science within the discipline of Physical Science. Also, this study focused on equality to determine if a fair playing field and equal opportunity for women in academics has improved since Title IX. A limited amount of research has explored female award recipients. Specifically, existing research, has not examined the pinnacle of academic performance in the form of national and international awards. In the present study, I posed research questions relating to demographic characteristics of award recipients from the Nobel, NAS, and NSF between 1975 and 2015. Additionally, I examined if sex and age of the awardees could predict early career award obtainment. Through the frame of Social cognitive theory (Bandura, 1986, 1997, and 2005) I considered how perceptions of gender roles are a product of influence by society and the possible connection to performance. Results indicated a limited number of females have received these scientific awards and the awardees age could predict receiving an award early in their career. Additionally, the study provided insight into the progression of Title IX within the context of athletics and academics. It addressed the incremental and systematic increase in academics for women at high school, college, career, and scientific awards. Perhaps most importantly, it identified an observed pattern for female science award recipients reaching a critical mass and a tipping point.

  7. Ernest Orlando Lawrence Awards Ceremony for 2011 Award Winners (Presentations, including remarks by Energy Secretary, Dr. Steven Chu)

    International Nuclear Information System (INIS)

    Chu, Steven

    2012-01-01

    The winners for 2011 of the Department of Energy's Ernest Orlando Lawrence Award were recognized in a ceremony held May 21, 2012. Dr. Steven Chu and others spoke of the importance of the accomplishments and the prestigious history of the award. The recipients of the Ernest Orlando Lawrence Award for 2011 are: Riccardo Betti (University of Rochester); Paul C. Canfield (Ames Laboratory); Mark B. Chadwick (Los Alamos National Laboratory); David E. Chavez (Los Alamos National Laboratory); Amit Goyal (Oak Ridge National Laboratory); Thomas P. Guilderson (Lawrence Livermore National Laboratory); Lois Curfman McInnes (Argonne National Laboratory); Bernard Matthew Poelker (Thomas Jeffereson National Accelerator Facility); and Barry F. Smith (Argonne National Laboratory).

  8. 45 CFR 13.29 - Payment of award.

    Science.gov (United States)

    2010-10-01

    ... States courts. The Department will pay the amount awarded to the applicant within 60 days, unless... Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION IMPLEMENTATION OF THE EQUAL ACCESS... and address of the appropriate Departmental finance office that will pay the award. An applicant...

  9. CASE Recognition Awards.

    Science.gov (United States)

    Currents, 1985

    1985-01-01

    A total of 294 schools, colleges, and universities received prizes in this year's CASE Recognition program. Awards were given in: public relations programs, student recruitment, marketing, program pulications, news writing, fund raising, radio programming, school periodicals, etc. (MLW)

  10. Grant Application Development, Submission, Review, & Award

    Science.gov (United States)

    This infographic shows the National Cancer Institute general timeline progression through Grant Application Development, Submission, Review, and Award Infographic. In the first month, Applicant prepares and submits Grant Application to Grants.gov in response to FOA. In month two, The Center for Scientific Review (CSR) assigns applications that fall under the category of R01s, etc. to a Scientific Review Group (SRG) or the CSR assigns applications that fall under the category of Program Projects and Center Grants to NCI Division of Extramural Activities (DEA). Months four through five: First-level review by Scientific Review Group (SRG) for Scientific Merit: SRG assigns Impact Scores. Month five Summary Sstatements are prepared and are available to NCI Program staff and applicants. Month six, second-level review by National Cancer Advisory board (NCAB) for NCI Funding determination begins. NCAB makes recommendation to NCI Director, NCI develops funding plan, Applications selected for Funding, “Paylists” forwarded to Office of Grant Administration (OGA). Month ten, Award Negotiations and Issuance: Award issued, Award received by Institution, and Investigator begins work. www.cancer.gov Icons made by Freepik from http://www.flaticon.com is licensed by CC BY3.0

  11. Increasing the Department of the Navy’s Opportunities for Small Businesses and Non-Traditional Suppliers through Simplified Acquisitions Contracting and NAICS Targeting

    Science.gov (United States)

    2013-08-01

    PSC)? Why does FPDS-NG have both? The North American Free Trade Agreement ( NAFTA ) requires the use of NAICS by the Government. The NAICS...Operational and Information Sciences (GSOIS), and the School of International Graduate Studies (SIGS). As such, NPS contracting requirements constitute a...awards in top 10 large business NAICS constituted approximately 41.24 percent of total SAT level spending, which includes 4 NAICS where large

  12. 13 CFR 124.513 - Under what circumstances can a joint venture be awarded an 8(a) contract?

    Science.gov (United States)

    2010-01-01

    ...; and (ii)(A) For a procurement having a revenue-based size standard, the procurement exceeds half the... an employee-based size standard, the procurement exceeds $10 million; (2) For sole source and... the purpose of performing one or more specific 8(a) contracts. (2) A joint venture agreement is...

  13. Does gender bias influence awards given by societies?

    Science.gov (United States)

    Holmes, Mary Anne; Asher, Pranoti; Farrington, John; Fine, Rana; Leinen, Margaret S.; LeBoy, Phoebe

    2011-11-01

    AGU is a participant in a U.S. National Science Foundation (NSF)-funded project called Advancing Ways of Awarding Recognition in Disciplinary Societies (AWARDS), which seeks to examine whether gender bias affects selection of recipients of society awards. AGU is interested in learning why there is a higher proportion of female recipients of service and education awards over the past 2 decades. Combined with a lower rate of receipt of research awards, these results suggest that implicit (subconscious) bias in favor of male candidates still influences awardee selection. Six other professional societies (American Chemical Society, American Mathematical Society, American Society of Anesthesiologists, Mathematical Association of America, Society for Neuroscience, and Society for Industrial and Applied Mathematics) are participating in the project. Volunteers from each participant society attended an Association for Women in Science (AWIS)-sponsored workshop in May 2010 to examine data and review literature on best practices for fair selection of society awardees. A draft proposal for implementing these practices will be brought before the AGU Council and the Honors and Recognition Committee at their upcoming meetings.

  14. ATLAS Supplier Award for the ECT Vacuum Vessels

    CERN Multimedia

    Jenni, P

    On 12 February the Netherlands firm Schelde Exotech was awarded the ATLAS Supplier Award for the construction of the two vacuum vessels for the ATLAS End- Cap Toroid (ECT) magnets. ATLAS Supplier Award ceremonies have now become something of a tradition. For the third consecutive year, ATLAS has given best supplier awards for the most exceptional contributors to the construction of the detector. The Netherlands firm Schelde Exotech has just received the award for the construction of the two vacuum vessels for the ECTs. With a diameter of 11 metres and a volume of 550 cubic metres, the ECT vacuum vessels are obviously impressive in scale. They consist of large aluminium plates and a stainless steel central bore tube. In order to obtain the required undulations, the firm had to develop a special assembly and welding technique. Despite the chambers' imposing size, a very high degree of precision has been achieved in their geometry. Moreover, the chambers, which were delivered in July 2002 to CERN, were built i...

  15. Faking or Convincing: Why Do Some Advertising Campaigns Win Creativity Awards?

    Directory of Open Access Journals (Sweden)

    Raoul V. Kübler

    2012-05-01

    Full Text Available Since the Sarbanes-Oxley Act was passed in 2002, it has become commonplace in the advertising industry to use creativity-award-show prizes instead of gross income figures to attract new customers. Therefore, achieving a top creativity ranking and winning creativity awards have become high priorities in the advertising industry. Agencies and marketers have always wondered what elements in the advertising creation process would lead to the winning of creativity awards. Although this debate has been dominated by pure speculation about the success of different routines, approaches and strategies in winning creativity awards, for the first time our study delivers an empirical insight into the key drivers of creativity award success. We investigate what strategies and which elements of an advertising campaign are truly likely to lead to winning the maximum number of creativity awards. Using a sample of 108 campaigns, we identify factors that influence campaign success at international advertising award shows. We identify innovativeness and the integration of multiple channels as the key drivers of creativity award success. In contrast to industry beliefs, meaningful or personally connecting approaches do not seem to generate a significant benefit in terms of winning creativity awards. Finally, our data suggest that the use of so-called “fake campaigns” to win more creativity awards does not prove to be effective.

  16. 19 CFR 212.05 - Standards for awards.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Standards for awards. 212.05 Section 212.05 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE IMPLEMENTATION OF THE EQUAL ACCESS TO JUSTICE ACT General Provisions § 212.05 Standards for awards...

  17. NOTE receives the prestigious ALICE Industrial Award

    CERN Multimedia

    2006-01-01

    "NOTE Lund has been given the ALICE Industrial Award due to good co-operation, great capacity for innovation and high quality of work, as a PCB manufacturer in the CERN project ALICE. Only a small number of awards have so far been conferred to a select number of companies."

  18. 7 CFR 1.203 - Payment of award.

    Science.gov (United States)

    2010-01-01

    ... Equal Access to Justice Act in Proceedings Before the Department Procedures for Considering Applications... decision in the United States courts. The agency will pay the amount awarded to the applicant within 60 days, unless judicial review of the award or of the underlying decision of the adversary adjudication...

  19. Cultivating a Grassroots Aerospace Innovation Culture at NASA Ames Research Center

    Science.gov (United States)

    D'Souza, Sarah; Sanchez, Hugo; Lewis, Ryan

    2017-01-01

    This paper details the adaptation of specific 'knowledge production' methods to implement a first of its kind, grassroots event that provokes a cultural change in how the NASA Ames civil servant community engages in the creation and selection of innovative ideas. Historically, selection of innovative proposals at NASA Ames Research Center is done at the highest levels of management, isolating the views and perspectives of the larger civil servant community. Additionally, NASA innovation programs are typically open to technical organizations and do not engage non-technical organizations to bring forward innovative processes/business practices. Finally, collaboration on innovative ideas and associated solutions tend to be isolated to organizational silos. In this environment, not all Ames employees feel empowered to innovate and opportunities for employee collaboration are limited. In order to address these issues, the 'innovation contest' method was adapted to create the NASA Ames Innovation Fair, a unique, grassroots innovation opportunity for the civil servant community. The Innovation Fair consisted of a physical event with a virtual component. The physical event provided innovators the opportunity to collaborate and pitch their innovations to the NASA Ames community. The civil servant community then voted for the projects that they viewed as innovative and would contribute to NASA's core mission, making this event a truly grassroots effort. The Innovation Fair website provided a location for additional knowledge sharing, discussion, and voting. On March 3rd, 2016, the 'First Annual NASA Ames Innovation Fair' was held with 49 innovators and more than 300 participants collaborating and/or voting for the best innovations. Based on the voting results, seven projects were awarded seed funding for projects ranging from innovative cost models to innovations in aerospace technology. Surveys of both innovators and Fair participants show the Innovation Fair was successful

  20. 2004 Small Business Award

    Science.gov (United States)

    Presidential Green Chemistry Challenge 2004 award winner, Jeneil Biosurfactant Company, makes biobased, rhamnolipid surfactants by fermentation that are less toxic and more biodegradable than conventional surfactants.

  1. NASA and ESA Collaboration on Hexavalent Chrome Alternatives - Pretreatments with Primers Screening Final Test Report

    Science.gov (United States)

    Rothgeb, Matthew J.; Kessel, Kurt R.

    2015-01-01

    Hexavalent chromium (hex chrome or Cr(VI)) is a widely used element within applied coating systems because of its self-healing and corrosion-resistant properties. The replacement of hex chrome in the processing of aluminum for aviation and aerospace applications remains a goal of great significance. Aluminum is the major manufacturing material of structures and components in the space flight arena. The National Aeronautics and Space Administration (NASA) and the European Space Agency (ESA) are engaged in a collaborative effort to test and evaluate alternatives to hexavalent chromium containing corrosion coating systems. NASA and ESA share common risks related to material obsolescence associated with hexavalent chromium used in corrosion-resistant coatings. In the United States, Occupational Safety and Health Administration (OSHA) studies have concluded that hexavalent chromium is carcinogenic and poses significant risk to human health. On May 5, 2011, amendments to the Defense Federal Acquisition Regulation Supplement (DFARS) were issued in the Federal Register. Subpart 223.73 prohibits contracts from requiring hexavalent chromium in deliverables unless certain exceptions apply. Subpart 252.223-7008 provides the contract clause prohibiting contractors and subcontractors from using or delivering hexavalent chromium in a concentration greater than 0.1 percent by weight for all new contracts associated with supplies, maintenance and repair services, and construction materials. ESA faces its own increasingly stringent regulations within European directives such as Registration, Evaluation, Authorization and Restriction of Chemical (REACH) substances and the Restriction of Hazardous Substances Directive (RoHS) which have set a mid-2017 sunset date for hexavalent chromium. NASA and ESA continue to search for an alternative to hexavalent chromium in coatings applications that meet their performance requirements in corrosion protection, cost, operability, and health and

  2. From 2001 to 1994: Political environment and the design of NASA's Space Station system

    Science.gov (United States)

    Fries, Sylvia Doughty

    1988-01-01

    The U.S. civilian space station, a hope of numerous NASA engineers since before the agency was founded in 1958 and promoted by NASA as the country's 'next logical step' into space, provides an excellent case study of the way public-sector research and development agencies continuously redefine new technologies in the absence of the market discipline that governs private-sector technological development. The number of space station design studies conducted since 1959, both internally by NASA or contracted by the agency to the aerospace industry, easily exceeds a hundred. Because of this, three clearly distinguishable examples are selected from the almost thirty-year history of space station design in NASA. Together these examples illustrate the difficulty of defining a new technological system in the public sector as that system becomes increasingly subject, for its development, to the vagaries of federal research and development politics.

  3. NASA's Electric Sail Propulsion System Investigations over the Past Three Years

    Science.gov (United States)

    Wiegmann, Bruce M.

    2017-01-01

    Personnel from NASA's MSFC have been investigating the feasibility of an advanced propulsion system known as the Electric Sail for future scientific missions of exploration. This team initially won a NASA Space Technology Mission Directorate (STMD) Phase I NASA Innovative Advanced Concept (NIAC) award and then a two year follow-on Phase II NIAC award. This paper documents the findings from this three year investigation. An Electric sail propulsion system is a propellant-less and extremely fast propulsion system that takes advantage of the ions that are present in the solar wind to provide very rapid transit speeds whether to deep space or to the inner solar system. Scientific spacecraft could arrive to Pluto in 5 years, to the boundary of the solar system in ten to twelve years vs. thirty five plus years it took the Voyager spacecraft. The team's recent focused activities are: 1) Developing a Particle in Cell (PIC) numeric engineering model from the experimental data collected at MSFC's Solar Wind Facility on the interaction between simulated solar wind interaction with a charged bare wire that can be applied to a variety of missions, 2) The development of the necessary tether deployers/tethers to enable successful deployment of multiple, multi km length bare tethers, 3) Determining the different missions that can be captured from this revolutionary propulsion system 4) Conceptual designs of spacecraft to reach various destinations whether to the edge of the solar system, or as Heliophysics sentinels around the sun, or to trips to examine a multitude of asteroids These above activities, once demonstrated analytically, will require a technology demonstration mission (2021 to 2023) to demonstrate that all systems work together seamlessly before a Heliophysics Electrostatic Rapid Transit System (HERTS) could be given the go-ahead. The proposed demonstration mission will require that a small spacecraft must first travel to cis-lunar space as the Electric Sail must be

  4. 28 CFR 104.34 - Publication of awards.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Publication of awards. 104.34 Section 104.34 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) SEPTEMBER 11TH VICTIM COMPENSATION FUND... or all of the awards, but shall not publish the name of the claimants or victims that received each...

  5. 7 CFR 1.185 - Standards for awards.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Standards for awards. 1.185 Section 1.185 Agriculture Office of the Secretary of Agriculture ADMINISTRATIVE REGULATIONS Procedures Relating to Awards Under the... the agency which led to the adversary adjudication, but does not include a recitation by the agency of...

  6. LHC suppliers win Golden Hadron awards

    CERN Multimedia

    Maximilien Brice

    2004-01-01

    In a ceremony on 30 July, three of the 200 suppliers for the Large Hadron Collider (LHC) were presented with Golden Hadron awards. It is the third year that the awards have been presented to suppliers, not only for their technical and financial achievements but also for their compliance with contractual deadlines. This year the three companies are all involved in the supplies for the LHC's main magnet system.

  7. Awards and honours

    CERN Document Server

    ATLAS

    2009-01-01

    On the occasion of the international woman day, on 7 March, Fabiola Gianotti, ATLAS spokesperson, was awarded “Commendatore della Repubblica Italiana” by the Italian President for her “scientific knowledge and her excellent management skills demonstrated in guiding the ATLAS project”.

  8. Using AVIRIS In The NASA BAA Project To Evaluate The Impact Of Natural Acid Drainage On Colorado Watersheds

    Science.gov (United States)

    Hauff, Phoebe L.; Coulter, David W.; Peters, Douglas C.; Sares, Matthew A.; Prosh, Eric C.; Henderson, Frederick B., III; Bird, David

    2004-01-01

    The Colorado Geological Survey and the co-authors of this paper were awarded one of 15 NASA Broad Agency Announcement (BAA) grants in 2001. The project focuses on the use of hyperspectral remote sensing to map acid-generating minerals that affect water quality within a watershed, and to identify the relative contributions of natural and anthropogenic sources to that drainage. A further objective is to define the most cost-effective remote sensing instrument configuration for this application.

  9. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  10. Knee Society Award Papers Are Highly Cited Works.

    Science.gov (United States)

    Mroz, Tommy P; Clarke, Henry D; Chang, Yu-Hui H; Scuderi, Giles R

    2016-01-01

    Since 1993, The Knee Society has presented three annual awards recognizing the best research papers presented at the annual meetings. To date, no quantitative evaluation has determined whether the selection process identifies the most meritorious papers based on subsequent citations. In the absence of validation of this process, it is unclear whether the journal readership should view the award-winning papers as those with potentially greater impact for the specialty. (1) Are award papers cited both more than nonaward papers published in the same Knee Society proceedings issue of CORR(®) and more than all other knee research papers published in all issues of CORR(®) during any given year? (2) Does the award selection process identify potentially highly influential knee research? Subsequent citations for each award and nonaward paper published in The Knee Society proceedings issue for 2002 to 2008 were determined using the SCOPUS citation index. The citations for all papers on knee surgery published in CORR(®) during the same years were also determined. Mean citations for an award paper were statistically greater than for a nonaward paper: 86 (SD 95; median 55; 95% confidence interval [CI] of the mean, 44-128) versus 33 (SD 30; median 24; 95% CI of the mean, 28-37; p papers was also higher than for all other knee research papers published in nonproceedings issues of CORR(®): 86 (SD 95; median 55; 95% CI of the mean, 44-128) versus 30 (SD 31; median 20; 95% CI for the mean, 25-35; p papers were in the top five cited papers from the proceedings issue for the respective year versus 24 of the 190 (12.6%) of the nonaward papers (difference in the percentages is 41.9% and the 95% CI for the risk difference is 20.6%-63.3%; p paper was the most cited knee paper published in CORR(®). The selection process for The Knee Society scientific awards identifies potentially influential papers that are likely to be highly cited in future research articles about the knee. The

  11. A59 waste repackaging database (AWARD)

    International Nuclear Information System (INIS)

    Keel, A.

    1993-06-01

    This paper sets out the requirements for AWARD (the A59 Waste Repackaging Database); a computer-based system to record LLW sorting and repacking information from the North Cave Line in A59. A solution will be developed on the basis of this document. AWARD will record and store details entered from waste sorting and LLW repackaging operations. This document will be used as the basis of the development of the host computer system. (Author)

  12. 78 FR 27240 - Announcing the Award of a New Single-Source Award to the National Council on Family Violence in...

    Science.gov (United States)

    2013-05-09

    ....095] Announcing the Award of a New Single-Source Award to the National Council on Family Violence in... single-source cooperative agreement to the National Council on Family Violence to support the National Domestic Violence Hotline (Hotline). SUMMARY: The Administration for Children and Families (ACF...

  13. Research Award: Networked Economies

    International Development Research Centre (IDRC) Digital Library (Canada)

    Office 2004 Test Drive User

    2015-08-06

    year, paid, ... the areas of democracy, human rights and economic growth. ... Networked Economies is seeking a Research Award Recipient to explore research questions ... such as engineering or computer/information science;.

  14. Afghan Air Force University: Contract Requirements Were Generally Met, but Instances of Non Compliance, Poor Workmanship, and Inadequate Maintenance Need to Be Addressed

    Science.gov (United States)

    2016-03-01

    construction, which included a kitchen with multiple ranges, food preparation areas, and a series of walk-in cold storage areas that were all completed...stairways. For example, plumbing work done in the renovated bathrooms of four existing buildings and the new kitchen /cold storage area did not...Army Corps of Engineers (USACE) awarded a nearly $10 million fixed-price, design /build contract to Technologists, Inc., a U.S. company, to construct

  15. 48 CFR 1827.302 - Policy. (NASA supplements paragraphs (a), (b), (c), (d), (e), (f), (g), and (i)).

    Science.gov (United States)

    2010-10-01

    ... contractor's domestic subsidiaries and affiliates within the corporate structure, and includes the right to..., DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 1827.302 Policy. (NASA supplements... or Government Patent Policy to the Heads of Executive Departments and Agencies, dated February 18...

  16. 29 CFR 99.205 - Basis for determining Federal awards expended.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Basis for determining Federal awards expended. 99.205 Section 99.205 Labor Office of the Secretary of Labor AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Audits § 99.205 Basis for determining Federal awards expended. (a) Determining Federal awards...

  17. Award for Distinguished Contributions to Education and Training in psychology.

    Science.gov (United States)

    2017-12-01

    This award is given by the Board of Educational Affairs in recognition of the efforts of psychologists who have made distinguished contributions to education and training, who have produced imaginative innovations, or who have been involved in the developmental phases of programs in education and training in psychology. These contributions might include important research on education and training; the development of effective materials for instruction; the establishment of workshops, conferences, or networks of communication for education and training; achievement and leadership in administration that facilitates education and training; or activity in professional organizations that promote excellence. The Award for Distinguished Contributions to Education and Training in psychology recognizes a specific contribution to education and training. The Career designation is added to the award at the discretion of the Education and Training Awards Committee to recognize continuous significant contributions made over a lifelong career in psychology. This year the Education and Training Awards Committee selected a psychologist for the Career designation. The 2017 recipients of the APA Education and Training Contributions Awards were selected by the 2016 Education and Training Awards Committee appointed by the Board of Educational Affairs (BEA). Members of the 2016 Education and Training Awards Committee were Erica Wise, PhD (Chair); Ron Rozensky, PhD; Jane D. Halonen, PhD; Sharon Berry, PhD (Chair Elect); Emil Rodolfa, PhD; and Sylvia A. Rosenfield, PhD. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  18. Horton Grantee gets AAG Award

    Science.gov (United States)

    Jeffrey McDonnell, an assistant professor of forest hydrology at Utah State University, Logan, received the J. Warren Nystrom Award from the Association of American Geographers for his doctoral dissertation, “The Age, Origin and Pathway of Subsurface Stormflow in a Steep Humid Headwater Catchment.” In 1987, McDonnell was awarded AGU's Horton Research Grant for his thesis proposal.McDonnell received his Ph.D. in 1989 from the University of Canterbury, Christchurch, New Zealand. His dissertation was supervised by I. F. Owens, Department of Geography, University of Canterbury and A. J. Pearce, New Zealand Forest Research Institute.

  19. FY11 Coc Awards

    Data.gov (United States)

    Department of Housing and Urban Development — This report displays the renewal homeless assistance projects being awarded by HUD under the 2011 Continuum of Care (CoC) competitive grants process. Approximately...

  20. CPD Allocations and Awards

    Data.gov (United States)

    Department of Housing and Urban Development — The CPD Allocation and Award database provides filterable on-screen and exportable reports on select programs, such as the Community Development Block Grant Program,...