WorldWideScience

Sample records for multi-year work plan

  1. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  2. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  3. Tank waste remediation system multi-year work plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders

  4. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  5. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  6. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  7. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond

  8. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  9. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  10. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  11. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2; TOPICAL

    International Nuclear Information System (INIS)

    GRYGIEL, M.L.

    1998-01-01

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system

  12. Advanced reactors transition fiscal year 1995 multi-year program plan WBS 7.3

    International Nuclear Information System (INIS)

    Loika, E.F.

    1994-01-01

    This document describes in detail the work to be accomplished in FY-1995 and the out years for the Advanced Reactors Transition (WBS 7.3). This document describes specific milestones and funding profiles. Based upon the Fiscal Year 1995 Multi-Year Program Plan, DOE will provide authorization to perform the work outlined in the FY 1995 MYPP. Following direction given by the US Department of Energy (DOE) on December 15, 1993, Advanced Reactors Transition (ART), previously known as Advanced Reactors, will provide the planning and perform the necessary activities for placing the Fast Flux Test Facility (FFTF) in a radiologically and industrially safe shutdown condition. The DOE goal is to accomplish the shutdown in approximately five years. The Advanced Reactors Transition Multi-Year Program Plan, and the supporting documents; i.e., the FFTF Shutdown Program Plan and the FFTF Shutdown Project Resource Loaded Schedule (RLS), are defined for the life of the Program. During the transition period to achieve the Shutdown end-state, the facilities and systems will continue to be maintained in a safe and environmentally sound condition. Additionally, facilities that were associated with the Office of Nuclear Energy (NE) Programs, and are no longer required to support the Liquid Metal Reactor Program will be deactivated and transferred to an alternate sponsor or the Decontamination and Decommissioning (D and D) Program for final disposition, as appropriate

  13. Natural Gas Multi-Year Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  14. Multi-Year Program Plan - Building Regulatory Programs

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  15. Multi-Year Program Plan 2011-2015

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  16. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    Wells, J.L.

    1997-01-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  17. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  18. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  19. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  20. Solid waste programs Fiscal Year 1995 multi-year program plan/fiscal year work plan WBS 1.2.1

    International Nuclear Information System (INIS)

    McCarthy, M.M.

    1994-09-01

    The Hanford Mission Plan, Volume 1, Site Guidance identifies the need for the Solid Waste Program to treat, store, and dispose of a wide variety of solid material types consisting of multiple radioactive and hazardous waste classes. This includes future Hanford Site activities which will generate new wastes that must be handled as cleanup activities are completed. Solid wastes are typically categorized as transuranic waste, low level waste, low level mixed waste, and hazardous waste. To meet this need the Solid Waste Program has defined its mission as the following - receive, store, treat, decontaminate, and dispose of solid radioactive and nonradioactive dangerous wastes in a safe, cost effective and environmentally compliant manner. This workbook contains the program overview, program baselines and fiscal year work plan for the Solid Waste Program

  1. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  2. Multi-Year SSL Market Development Support Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ledbetter, Marc R.

    2012-05-01

    work closely with lighting industry organizations 'such as the Next Generation Lighting Industry Alliance, North American Illuminating Engineering Society, and the International Association of Lighting Designers' and with other government programs seeking to improve lighting energy efficiency. While DOE will work closely with these organizations and others from lighting and electric utility industry, the program will focus primarily on assisting buyers of SSL products and others acting on their behalf because satisfied buyers are essential to the success of SSL market adoption. The work product of DOE's efforts will primarily be information, of the right type, at the right time, and provided efficiently to those who can best use it. A secondary work product of DOE's program will be market opportunities, in which DOE will seek to reduce the risks and costs for manufacturers of SSL products to sell good quality, high performance products to motivated buyers. In short, DOE plans to implement a multi-year program that produces highly useful and widely available information for buyers and their agents, while producing important market opportunities for producers, avoids the mistakes of the past, and is closely coordinated with industry and government. The market needs and the overall strategy were used for deciding which types of programs and projects DOE should create, and what general form they should take. Progress toward achieving plan goals with the above program elements will be monitored and periodically reported.

  3. Multi-year expansion planning of large transmission networks

    Energy Technology Data Exchange (ETDEWEB)

    Binato, S; Oliveira, G C [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper describes a model for multi-year transmission network expansion to be used in long-term system planning. The network is represented by a linearized (DC) power flow and, for each year, operation costs are evaluated by a linear programming (LP) based algorithm that provides sensitivity indices for circuit reinforcements. A Backward/Forward approaches is proposed to devise an expansion plan over the study period. A case study with the southeastern Brazilian system is presented and discussed. (author) 18 refs., 5 figs., 1 tab.

  4. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  5. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  6. Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-11-01

    This is the November 2014 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  7. Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-03-01

    This is the March 2015 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  8. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  9. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    International Nuclear Information System (INIS)

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  10. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  11. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  12. Office of Inspector General fiscal year 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  13. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  14. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  15. Bioenergy Technologies Office Multi-Year Program Plan. March 2016

    Energy Technology Data Exchange (ETDEWEB)

    Schwab, Amy [Bioenergy Technologies Office, Washington, DC (United States)

    2016-03-01

    The Bioenergy Technologies Office is one of the 10 technology development offices within the Office of Energy Efficiency and Renewable Energy at the U.S. Department of Energy. This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office (the Office). It identifies the research, development, and demonstration (RD&D), and market transformation and crosscutting activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

  16. Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond

  17. Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

  18. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  19. A Multi-Year Plan for Enhancing Turbulence Modeling in Hydra-TH Revised and Updated Version 2.0

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Thomas M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Berndt, Markus [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baglietto, Emilio [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Magolan, Ben [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2015-10-01

    The purpose of this report is to document a multi-year plan for enhancing turbulence modeling in Hydra-TH for the Consortium for Advanced Simulation of Light Water Reactors (CASL) program. Hydra-TH is being developed to the meet the high- fidelity, high-Reynolds number CFD based thermal hydraulic simulation needs of the program. This work is being conducted within the thermal hydraulics methods (THM) focus area. This report is an extension of THM CASL milestone L3:THM.CFD.P10.02 [33] (March, 2015) and picks up where it left off. It will also serve to meet the requirements of CASL THM level three milestone, L3:THM.CFD.P11.04, scheduled for completion September 30, 2015. The objectives of this plan will be met by: maturation of recently added turbulence models, strategic design/development of new models and systematic and rigorous testing of existing and new models and model extensions. While multi-phase turbulent flow simulations are important to the program, only single-phase modeling will be considered in this report. Large Eddy Simulation (LES) is also an important modeling methodology. However, at least in the first year, the focus is on steady-state Reynolds Averaged Navier-Stokes (RANS) turbulence modeling.

  20. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    International Nuclear Information System (INIS)

    1998-03-01

    Consistent with the Environmental Management's (EM's) plan titled, ''Accelerating Cleanup: Paths to Closure'', and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided

  1. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

  2. Leading quality through the development of a multi-year corporate quality plan: sharing The Ottawa Hospital experience.

    Science.gov (United States)

    Hunter, Linda; Myles, Joanne; Worthington, James R; Lebrun, Monique

    2011-01-01

    This article discusses the background and process for developing a multi-year corporate quality plan. The Ottawa Hospital's goal is to be a top 10% performer in quality and patient safety in North America. In order to create long-term measurable and sustainable changes in the quality of patient care, The Ottawa Hospital embarked on the development of a three-year strategic corporate quality plan. This was accomplished by engaging the organization at all levels and defining quality frameworks, aligning with internal and external expectations, prioritizing strategic goals, articulating performance measurements and reporting to stakeholders while maintaining a transparent communication process. The plan was developed through an iterative process that engaged a broad base of health professionals, physicians, support staff, administration and senior management. A literature review of quality frameworks was undertaken, a Quality Plan Working Group was established, 25 key stakeholder interviews were conducted and 48 clinical and support staff consultations were held. The intent was to gather information on current quality initiatives and challenges encountered and to prioritize corporate goals and then create the quality plan. Goals were created and then prioritized through an affinity exercise. Action plans were developed for each goal and included objectives, tasks and activities, performance measures (structure, process and outcome), accountabilities and timelines. This collaborative methodology resulted in the development of a three-year quality plan. Six corporate goals were outlined by the tenets of the quality framework for The Ottawa Hospital: access to care, appropriate care (effective and efficient), safe care and satisfaction with care. Each of the six corporate goals identified objectives and supporting action plans with accountabilities outlining what would be accomplished in years one, two and three. The three-year quality plan was approved by senior

  3. Landlord Program multi-year program plan fiscal year 1995 WBS 7.5

    International Nuclear Information System (INIS)

    Young, C.L.

    1994-01-01

    The Landlord Program mission is to maintain, preserve, or upgrade the strategic assets of the Hanford Site to meet the overall cleanup mission. This encompasses innovative, appropriate, and cost effective general purpose infrastructure support, services, and long range strategic site planning that is the foundation for seven major Hanford programs. These programs are (1) Environmental Restoration, (2) Tank Waste Remediation System, (3) Solid/Liquid Waste Decontamination, (4) Facility Transition, (5) Spent Fuel, (6) Technology Development, and (7) the Multi-Program Laboratory. General infrastructure support consists of facilities, systems, and equipment that by design or use are not essentially dedicated to a single program mission. Facilities include laboratories, shops, warehouses, and general work space. Systems include electrical, process sewers, rail, roads, telecommunications, water, fire and emergency response, and steam supply and distribution. Funding also supports capital equipment critical to maintaining, upgrading, or operating the general infrastructure. Paramount to these objectives is compliance with all applicable laws, orders, agreements, codes, standards, best management and safety practices. The objectives for general infrastructure support are reflected in five programmatic functions, (1) Program Integration, (2) Capital Equipment, (3) Expense Funded Projects, (4) General Plant Projects, and (5) Line Items

  4. Review and Update Project Design, Work Plan and Activities for 2009 and Beyond

    International Nuclear Information System (INIS)

    Edward, M.

    2009-01-01

    A multi year ongoing project, previously approved by Board of Governors (BOG) that is implemented according to the already approved objectives/outcomes and time frame. All projects have time frame in line with the stated objectives and work plans, of maximum of five years. If rephasing is necessary due to dealys in implementation, the project duration can be extended by up to one year, maintaining the original objectives/outcomes

  5. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  6. Multi-Working Modes Product-Color Planning Based on Evolutionary Algorithms and Swarm Intelligence

    Directory of Open Access Journals (Sweden)

    Man Ding

    2010-01-01

    Full Text Available In order to assist designer in color planning during product development, a novel synthesized evaluation method is presented to evaluate color-combination schemes of multi-working modes products (MMPs. The proposed evaluation method considers color-combination images in different working modes as evaluating attributes, to which the corresponding weights are assigned for synthesized evaluation. Then a mathematical model is developed to search for optimal color-combination schemes of MMP based on the proposed evaluation method and two powerful search techniques known as Evolution Algorithms (EAs and Swarm Intelligence (SI. In the experiments, we present a comparative study for two EAs, namely, Genetic Algorithm (GA and Difference Evolution (DE, and one SI algorithm, namely, Particle Swarm Optimization (PSO, on searching for color-combination schemes of MMP problem. All of the algorithms are evaluated against a test scenario, namely, an Arm-type aerial work platform, which has two working modes. The results show that the DE obtains the superior solution than the other two algorithms for color-combination scheme searching problem in terms of optimization accuracy and computation robustness. Simulation results demonstrate that the proposed method is feasible and efficient.

  7. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  8. Knowledge co-production and boundary work to promote implementation of conservation plans.

    Science.gov (United States)

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  9. Effect of objective function on multi-objective inverse planning of radiation therapy

    International Nuclear Information System (INIS)

    Li Guoli; Wu Yican; Song Gang; Wang Shifang

    2006-01-01

    There are two kinds of objective functions in radiotherapy inverse planning: dose distribution-based and Dose-Volume Histogram (DVH)-based functions. The treatment planning in our days is still a trial and error process because the multi-objective problem is solved by transforming it into a single objective problem using a specific set of weights for each object. This work investigates the problem of objective function setting based on Pareto multi-optimization theory, and compares the effect on multi-objective inverse planning of those two kinds of objective functions including calculation time, converge speed, etc. The basis of objective function setting on inverse planning is discussed. (authors)

  10. The Hanford Site Environmental Restoration Program 1993 fiscal year work plan

    International Nuclear Information System (INIS)

    1992-09-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This document describes the overall ER Mission Area and provides FYWP appendixes for each of the five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Treatment, Storage, and/or Disposal (TSD)

  11. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS {number_sign}1.4

    Energy Technology Data Exchange (ETDEWEB)

    Denning, J.L.

    1994-09-01

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan.

  12. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS number-sign 1.4

    International Nuclear Information System (INIS)

    Denning, J.L.

    1994-09-01

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan

  13. Multi-site pain and working conditions as predictors of work ability in a 4-year follow-up among food industry employees.

    Science.gov (United States)

    Neupane, S; Virtanen, P; Leino-Arjas, P; Miranda, H; Siukola, A; Nygård, C-H

    2013-03-01

    We investigated the separate and joint effects of multi-site musculoskeletal pain and physical and psychosocial exposures at work on future work ability. A survey was conducted among employees of a Finnish food industry company in 2005 (n = 1201) and a follow-up survey in 2009 (n = 734). Information on self-assessed work ability (current work ability on a scale from 0 to 10; 7 = poor work ability), multi-site musculoskeletal pain (pain in at least two anatomical areas of four), leisure-time physical activity, body mass index and physical and psychosocial exposures was obtained by questionnaire. The separate and joint effects of multi-site pain and work exposures on work ability at follow-up, among subjects with good work ability at baseline, were assessed by logistic regression, and p-values for the interaction derived. Compared with subjects with neither multi-site pain nor adverse work exposure, multi-site pain at baseline increased the risk of poor work ability at follow-up, allowing for age, gender, occupational class, body mass index and leisure-time physical activity. The separate effects of the work exposures on work ability were somewhat smaller than those of multi-site pain. Multi-site pain had an interactive effect with work environment and awkward postures, such that no association of multi-site pain with poor work ability was seen when work environment was poor or awkward postures present. The decline in work ability connected with multi-site pain was not increased by exposure to adverse physical or psychosocial factors at work. © 2012 European Federation of International Association for the Study of Pain Chapters.

  14. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    International Nuclear Information System (INIS)

    Slaybaugh, R.R.

    1997-08-01

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project

  15. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  16. SU-C-BRD-01: Multi-Centre Collaborative Quality Assurance Program for IMRT Planning and Delivery: Year 3 Results

    Energy Technology Data Exchange (ETDEWEB)

    McNiven, A; Jaffray, D; Letourneau, D [Princess Margaret Cancer Centre and Department of Radiation Oncology, University of Toronto, Toronto, ON (Canada)

    2015-06-15

    Purpose: A multi-centre quality assurance program was developed to enable quality improvement by coupling measurement of intensity modulated radiotherapy (IMRT) planning and delivery performance for site-specific planning exercises with diagnostic testing. The third year of the program specifically assessed the quality of spine stereotactic body radiotherapy (SBRT) planning and delivery amongst the participating centres. Methods: A spine SBRT planning exercise (24 Gy in 2 fractions) was created and completed by participants prior to an on-site visit. The delivery portion of the on-site visit included spine SBRT plan delivery and diagnostic testing, which included portal image acquisition for quantification of phantom positioning error and multi-leaf collimator (MLC) calibration accuracy. The measured dose was compared to that calculated in the treatment planning system (TPS) using 3%/2mm composite analysis and 3%/3mm gamma analysis. Results: Fourteen institutions participated, creating 17 spine SBRT plans (15 VMAT and 2 IMRT). Three different TPS, two beam energies (6 MV and 6 MV FFF), and four MLC designs from two linac vendors were tested. Large variation in total monitor units (MU) per plan (2494–6462 MU) and dose-volume parameters was observed. The maximum point dose in the plans ranged from 116–149% and was dependent upon the TPS used. Pass rates for measured to planned dose comparison ranged from 89.4–100% and 97.3–100% for 3%/2mm and 3%/3mm criteria respectively. The largest measured MLC error did Result in one of the poorer pass rates. No direct correlation between phantom positioning error and pass rates overall. Conclusion: Significant differences were observed in the planning exercise for some plan and dose-volume parameters based on the TPS used. Standard evaluation criteria showed good agreement between planned and measured dose for all participants, however on an individual plan basis, diagnostic tests were able to identify contributing

  17. SU-C-BRD-01: Multi-Centre Collaborative Quality Assurance Program for IMRT Planning and Delivery: Year 3 Results

    International Nuclear Information System (INIS)

    McNiven, A; Jaffray, D; Letourneau, D

    2015-01-01

    Purpose: A multi-centre quality assurance program was developed to enable quality improvement by coupling measurement of intensity modulated radiotherapy (IMRT) planning and delivery performance for site-specific planning exercises with diagnostic testing. The third year of the program specifically assessed the quality of spine stereotactic body radiotherapy (SBRT) planning and delivery amongst the participating centres. Methods: A spine SBRT planning exercise (24 Gy in 2 fractions) was created and completed by participants prior to an on-site visit. The delivery portion of the on-site visit included spine SBRT plan delivery and diagnostic testing, which included portal image acquisition for quantification of phantom positioning error and multi-leaf collimator (MLC) calibration accuracy. The measured dose was compared to that calculated in the treatment planning system (TPS) using 3%/2mm composite analysis and 3%/3mm gamma analysis. Results: Fourteen institutions participated, creating 17 spine SBRT plans (15 VMAT and 2 IMRT). Three different TPS, two beam energies (6 MV and 6 MV FFF), and four MLC designs from two linac vendors were tested. Large variation in total monitor units (MU) per plan (2494–6462 MU) and dose-volume parameters was observed. The maximum point dose in the plans ranged from 116–149% and was dependent upon the TPS used. Pass rates for measured to planned dose comparison ranged from 89.4–100% and 97.3–100% for 3%/2mm and 3%/3mm criteria respectively. The largest measured MLC error did Result in one of the poorer pass rates. No direct correlation between phantom positioning error and pass rates overall. Conclusion: Significant differences were observed in the planning exercise for some plan and dose-volume parameters based on the TPS used. Standard evaluation criteria showed good agreement between planned and measured dose for all participants, however on an individual plan basis, diagnostic tests were able to identify contributing

  18. A multi-objective approach for developing national energy efficiency plans

    International Nuclear Information System (INIS)

    Haydt, Gustavo; Leal, Vítor; Dias, Luís

    2014-01-01

    This paper proposes a new approach to deal with the problem of building national energy efficiency (EE) plans, considering multiple objectives instead of only energy savings. The objectives considered are minimizing the influence of energy use on climate change, minimizing the financial risk from the investment, maximizing the security of energy supply, minimizing investment costs, minimizing the impacts of building new power plants and transmission infrastructures, and maximizing the local air quality. These were identified through literature review and interaction with real decision makers. A database of measures is established, from which millions of potential EE plans can be built by combining measures and their respective degree of implementation. Finally, a hybrid multi-objective and multi-criteria decision analysis (MCDA) model is proposed to search and select the EE plans that best match the decision makers’ preferences. An illustration of the working mode and the type of results obtained from this novel hybrid model is provided through an application to Portugal. For each of five decision perspectives a wide range of potential best plans were identified. These wide ranges show the relevance of introducing multi-objective analysis in a comprehensive search space as a tool to inform decisions about national EE plans. - Highlights: • A multiple objective approach to aid the choice of national energy efficiency plans. • A hybrid multi-objective MCDA model is proposed to search among the possible plans. • The model identified relevant plans according to five different idealized DMs. • The approach is tested with Portugal

  19. Participatory Multi-Criteria Assessment of Forest Planning Policies in Conflicting Situations: The Case of Tenerife

    Directory of Open Access Journals (Sweden)

    Montserrat Acosta

    2015-11-01

    Full Text Available Sustainable forest planning should involve the participation of stakeholder communities in the decision-making process. This participation can help avoid the possible rejection of new planning measures. In this paper, the decision-making process to implement regulations on the use of forest tracks on the island of Tenerife (Canary Islands, Spain is analyzed. In recent years, the number of people using the island’s forest environments has notably increased, leading to conflicts between different users of the tracks; as a result, the Island Council of Tenerife is working on regulating these pathways. This paper describes the framing analysis, design, and implementation of a participatory multi-criteria approach to explore, together with stakeholders, the best policy alternatives related to forest planning and management issues of forest track use. To do this, a set of tools has been developed, consisting of institutional analysis, participatory methods, and multi-criteria assessment techniques.

  20. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  1. MINERVA - a multi-modal radiation treatment planning system

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, C.A. E-mail: cew@enel.gov; Wessol, D.E.; Nigg, D.W.; Cogliati, J.J.; Milvich, M.L.; Frederickson, C.; Perkins, M.; Harkin, G.J

    2004-11-01

    Researchers at the Idaho National Engineering and Environmental Laboratory and Montana State University have undertaken development of MINERVA, a patient-centric, multi-modal, radiation treatment planning system. This system can be used for planning and analyzing several radiotherapy modalities, either singly or combined, using common modality independent image and geometry construction and dose reporting and guiding. It employs an integrated, lightweight plugin architecture to accommodate multi-modal treatment planning using standard interface components. The MINERVA design also facilitates the future integration of improved planning technologies. The code is being developed with the Java Virtual Machine for interoperability. A full computation path has been established for molecular targeted radiotherapy treatment planning, with the associated transport plugin developed by researchers at the Lawrence Livermore National Laboratory. Development of the neutron transport plugin module is proceeding rapidly, with completion expected later this year. Future development efforts will include development of deformable registration methods, improved segmentation methods for patient model definition, and three-dimensional visualization of the patient images, geometry, and dose data. Transport and source plugins will be created for additional treatment modalities, including brachytherapy, external beam proton radiotherapy, and the EGSnrc/BEAMnrc codes for external beam photon and electron radiotherapy.

  2. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    International Nuclear Information System (INIS)

    Fritz, R.L.

    1995-01-01

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities

  3. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  4. Cooperative heuristic multi-agent planning

    NARCIS (Netherlands)

    De Weerdt, M.M.; Tonino, J.F.M.; Witteveen, C.

    2001-01-01

    In this paper we will use the framework to study cooperative heuristic multi-agent planning. During the construction of their plans, the agents use a heuristic function inspired by the FF planner (l3l). At any time in the process of planning the agents may exchange available resources, or they may

  5. Multi-objective Transmission Planning Paper

    DEFF Research Database (Denmark)

    Xu, Zhao; Dong, Zhao Yang; Wong, Kit Po

    2009-01-01

    This paper describes a transmission expansion planning method based on multi-objective optimization (MOOP). The method starts with constructing a candidate pool of feasible expansion plans, followed by selection of the best candidates through MOOP, of which multiple objectives are tackled...

  6. Stochastic multi-period multi-product multi-objective Aggregate Production Planning model in multi-echelon supply chain

    Directory of Open Access Journals (Sweden)

    Kaveh Khalili-Damghani

    2017-07-01

    Full Text Available In this paper a multi-period multi-product multi-objective aggregate production planning (APP model is proposed for an uncertain multi-echelon supply chain considering financial risk, customer satisfaction, and human resource training. Three conflictive objective functions and several sets of real constraints are considered concurrently in the proposed APP model. Some parameters of the proposed model are assumed to be uncertain and handled through a two-stage stochastic programming (TSSP approach. The proposed TSSP is solved using three multi-objective solution procedures, i.e., the goal attainment technique, the modified ε-constraint method, and STEM method. The whole procedure is applied in an automotive resin and oil supply chain as a real case study wherein the efficacy and applicability of the proposed approaches are illustrated in comparison with existing experimental production planning method.

  7. Idaho National Laboratory 2013-2022 Ten-Year Site Plan

    Energy Technology Data Exchange (ETDEWEB)

    Calvin Ozaki; Sheryl L. Morton; Elizabeth A. Connell; William T. Buyers; Craig L. Jacobson; Charles T. Mullen; Christopher P. Ischay; Ernest L. Fossum; Robert D. Logan

    2011-06-01

    The Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of transforming the laboratory to meet Department of Energy (DOE) national nuclear research and development (R&D) goals, as outlined in DOE strategic plans. The plan links R&D mission goals and INL core capabilities with infrastructure requirements (single- and multi-program), establishs the 10-year end-state vision for INL complexes, and identifies and prioritizes infrastructure needs and capability gaps. The TYSP serves as the basis for documenting and justifying infrastructure investments proposed as part of the FY 2013 budget formulation process.

  8. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    International Nuclear Information System (INIS)

    Jacobsen, P.H.

    1997-01-01

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible

  9. A multi-modality concept for radiotherapy planning with imaging techniques

    International Nuclear Information System (INIS)

    Schultze, J.

    1993-01-01

    The reported multi-modality concept of radiotherapy planning in the LAN can be realised in any hospital with standard equipment, although in some cases by way of auxiliary configurations. A software is currently developed as a tool for reducing the entire planning work. The heart of any radiotherapy planning is the therapy simulator, which has to be abreast with the requirements of modern radiotherapy. Integration of tomograpy, digitalisation, and electronic data processing has added important modalities to therapy planning which allow more precise target volume definition, and better biophysical planning. This is what is needed in order to achieve well differentiated radiotherapy for treatment of the manifold tumors, and the quality standards expected by the supervisory quality assurance regime and the population. At present, the CT data still are transferred indirect, on storage media, to the EDP processing system of the radiotherapy planning system. Based on the tomographic slices given by the imaging data, the contours and technical problem solutions are derived automatically, either for multi-field radiotherapy or moving field irradiation, depending on the anatomy or the targets to be protected from ionizing radiation. (orig./VHE) [de

  10. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  11. River Protection Project FY 2000 Multi Year Work Plan Summary

    International Nuclear Information System (INIS)

    LENSEIGNE, D.L.

    1999-01-01

    The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort

  12. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  13. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  14. A Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brennan T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Welch, Tim [U.S. Department of Energy (DOE), Washington, DC (United States).Office of Energy Efficiency and Renewable Energy (EERE); Witt, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stewart, Kevin M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lee, Kyutae [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); DeNeale, Scott T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevelhimer, Mark S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Burress, Timothy A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pracheil, Brenda M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pries, Jason L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); O' Connor, Patrick W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Curd, Shelaine L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ekici, Kivanc [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Papanicolaou, Thanos [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Tsakiris, Achilleas [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Kutz, Benjamin [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Bishop, Norm [Knight Piesold, Denver, CO (United States); McKeown, Alisha [McKeown and Associates, Moberly, MO (United States); Rabon, Daniel [U.S. Department of Energy (DOE), Washington, DC (United States).Office of Energy Efficiency and Renewable Energy (EERE); Zimmerman, Gregory P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Uria Martinez, Rocio [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); McManamay, Ryan A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-02-01

    The Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology (MYRP) presents a strategy for specifying, designing, testing, and demonstrating the efficacy of standard modular hydropower (SMH) as an environmentally compatible and cost-optimized renewable electricity generation technology. The MYRP provides the context, background, and vision for testing the SMH hypothesis: if standardization, modularity, and preservation of stream functionality become essential and fully realized features of hydropower technology, project design, and regulatory processes, they will enable previously unrealized levels of new project development with increased acceptance, reduced costs, increased predictability of outcomes, and increased value to stakeholders. To achieve success in this effort, the MYRP outlines a framework of stakeholder-validated criteria, models, design tools, testing facilities, and assessment protocols that will facilitate the development of next-generation hydropower technologies.

  15. 77 FR 60457 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning...

    Science.gov (United States)

    2012-10-03

    ...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning... of comments pertaining to the development of the Midwest Wind Energy Multi-Species Habitat..., intend to prepare the Midwest Wind Energy Multi-Species Habitat Conservation Plan (MSHCP) under the...

  16. Dynamic and stochastic multi-project planning

    CERN Document Server

    Melchiors, Philipp

    2015-01-01

    This book deals with dynamic and stochastic methods for multi-project planning. Based on the idea of using queueing networks for the analysis of dynamic-stochastic multi-project environments this book addresses two problems: detailed scheduling of project activities, and integrated order acceptance and capacity planning. In an extensive simulation study, the book thoroughly investigates existing scheduling policies. To obtain optimal and near optimal scheduling policies new models and algorithms are proposed based on the theory of Markov decision processes and Approximate Dynamic programming.

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  18. Solar Energy Technologies Program: Multi-Year Technical Plan 2003-2007 and Beyond

    Energy Technology Data Exchange (ETDEWEB)

    2004-01-01

    This publication charts a 5-year planning cycle for the U.S. Department of Energy Solar Energy Technologies Program. The document includes anticipated technical plans for the next 5 years for photovoltaics, concentrating solar power, solar water and space heating, solar hybrid lighting, and other new concepts that can take advantage of the solar resource. Solar energy is described as a clean, abundant, renewable energy resource that can benefit the nation by diversifying our energy supply.

  19. Onboard autonomous mission re-planning for multi-satellite system

    Science.gov (United States)

    Zheng, Zixuan; Guo, Jian; Gill, Eberhard

    2018-04-01

    This paper presents an onboard autonomous mission re-planning system for Multi-Satellites System (MSS) to perform onboard re-planing in disruptive situations. The proposed re-planning system can deal with different potential emergency situations. This paper uses Multi-Objective Hybrid Dynamic Mutation Genetic Algorithm (MO-HDM GA) combined with re-planning techniques as the core algorithm. The Cyclically Re-planning Method (CRM) and the Near Real-time Re-planning Method (NRRM) are developed to meet different mission requirements. Simulations results show that both methods can provide feasible re-planning sequences under unforeseen situations. The comparisons illustrate that using the CRM is average 20% faster than the NRRM on computation time. However, by using the NRRM more raw data can be observed and transmitted than using the CRM within the same period. The usability of this onboard re-planning system is not limited to multi-satellite system. Other mission planning and re-planning problems related to autonomous multiple vehicles with similar demands are also applicable.

  20. Fuzzy multi-project rough-cut capacity planning

    NARCIS (Netherlands)

    Masmoudi, Malek; Hans, Elias W.; Leus, Roel; Hait, Alain; Sotskov, Yuri N.; Werner, Frank

    2014-01-01

    This chapter studies the incorporation of uncertainty into multi-project rough-cut capacity planning. We use fuzzy sets to model uncertainties, adhering to the so-called possibilistic approach. We refer to the resulting proactive planning environment as Fuzzy Rough Cut Capacity Planning (FRCCP).

  1. Multi-objective optimization of inverse planning for accurate radiotherapy

    International Nuclear Information System (INIS)

    Cao Ruifen; Pei Xi; Cheng Mengyun; Li Gui; Hu Liqin; Wu Yican; Jing Jia; Li Guoli

    2011-01-01

    The multi-objective optimization of inverse planning based on the Pareto solution set, according to the multi-objective character of inverse planning in accurate radiotherapy, was studied in this paper. Firstly, the clinical requirements of a treatment plan were transformed into a multi-objective optimization problem with multiple constraints. Then, the fast and elitist multi-objective Non-dominated Sorting Genetic Algorithm (NSGA-II) was introduced to optimize the problem. A clinical example was tested using this method. The results show that an obtained set of non-dominated solutions were uniformly distributed and the corresponding dose distribution of each solution not only approached the expected dose distribution, but also met the dose-volume constraints. It was indicated that the clinical requirements were better satisfied using the method and the planner could select the optimal treatment plan from the non-dominated solution set. (authors)

  2. Policy Design of Multi-Year Crop Insurance Contracts with Partial Payments.

    Directory of Open Access Journals (Sweden)

    Ying-Erh Chen

    Full Text Available Current crop insurance is designed to mitigate monetary fluctuations resulting from yield losses for a specific year. However, yield realization tendency can vary from year to year and may depend on the correlation of yield realizations across years. When the current single-year Yield Protection (YP and Area Risk Protection Insurance (ARPI contracts are extended to multiple periods, actuarially fair premium rate is expected to decrease as poor yield realizations in a year can be offset by another year's better yield realizations. In this study, we first use simulations to demonstrate how significant premium savings are possible when coverage is based on the sum of yields across years rather than on a year-by-year basis. We then describe the design of a multi-year framework of crop insurance and model the insurance using a copula approach. Insurance terms are extended to more than a year and the premium, liability, and indemnity are determined by a multi-year term. Moreover, partial payment is provided at the end of each term to offset the possibility of significant loss in a single term. County-level data obtained from the U.S. Department of Agriculture are used to demonstrate the implementations of the proposed multi-year crop insurance. The proposed multi-year plan would benefit farmers by offering insurance guarantees across years for significantly lower costs.

  3. Multi-annual energy plan of Martinique 2015/2018 - 2019/2023

    International Nuclear Information System (INIS)

    2015-11-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Martinique island (French West Indies). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 4-years period (2015-2018) followed by a second 5-years period (2019-2023)

  4. Multi-annual energy plan for Corsica 2016-2018/2019-2023

    International Nuclear Information System (INIS)

    2015-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Corsica Island (Mediterranean Sea). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  5. Multi-annual energy plan for Mayotte 2016-2018 / 2019- 2023

    International Nuclear Information System (INIS)

    2016-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Mayotte Island (Indian Ocean). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  6. 77 FR 52754 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning Area

    Science.gov (United States)

    2012-08-30

    ...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning... our planning partners, intend to prepare the Midwest Wind Energy Multi-Species Habitat Conservation... decommissioning of wind energy facilities within all or portions of the eight-State planning area. Activities...

  7. IMPERA: Integrated Mission Planning for Multi-Robot Systems

    Directory of Open Access Journals (Sweden)

    Daniel Saur

    2015-10-01

    Full Text Available This paper presents the results of the project IMPERA (Integrated Mission Planning for Distributed Robot Systems. The goal of IMPERA was to realize an extraterrestrial exploration scenario using a heterogeneous multi-robot system. The main challenge was the development of a multi-robot planning and plan execution architecture. The robot team consists of three heterogeneous robots, which have to explore an unknown environment and collect lunar drill samples. The team activities are described using the language ALICA (A Language for Interactive Agents. Furthermore, we use the mission planning system pRoPhEt MAS (Reactive Planning Engine for Multi-Agent Systems to provide an intuitive interface to generate team activities. Therefore, we define the basic skills of our team with ALICA and define the desired goal states by using a logic description. Based on the skills, pRoPhEt MAS creates a valid ALICA plan, which will be executed by the team. The paper describes the basic components for communication, coordinated exploration, perception and object transportation. Finally, we evaluate the planning engine pRoPhEt MAS in the IMPERA scenario. In addition, we present further evaluation of pRoPhEt MAS in more dynamic environments.

  8. An expert-based approach to forest road network planning by combining Delphi and spatial multi-criteria evaluation.

    Science.gov (United States)

    Hayati, Elyas; Majnounian, Baris; Abdi, Ehsan; Sessions, John; Makhdoum, Majid

    2013-02-01

    Changes in forest landscapes resulting from road construction have increased remarkably in the last few years. On the other hand, the sustainable management of forest resources can only be achieved through a well-organized road network. In order to minimize the environmental impacts of forest roads, forest road managers must design the road network efficiently and environmentally as well. Efficient planning methodologies can assist forest road managers in considering the technical, economic, and environmental factors that affect forest road planning. This paper describes a three-stage methodology using the Delphi method for selecting the important criteria, the Analytic Hierarchy Process for obtaining the relative importance of the criteria, and finally, a spatial multi-criteria evaluation in a geographic information system (GIS) environment for identifying the lowest-impact road network alternative. Results of the Delphi method revealed that ground slope, lithology, distance from stream network, distance from faults, landslide susceptibility, erosion susceptibility, geology, and soil texture are the most important criteria for forest road planning in the study area. The suitability map for road planning was then obtained by combining the fuzzy map layers of these criteria with respect to their weights. Nine road network alternatives were designed using PEGGER, an ArcView GIS extension, and finally, their values were extracted from the suitability map. Results showed that the methodology was useful for identifying road that met environmental and cost considerations. Based on this work, we suggest future work in forest road planning using multi-criteria evaluation and decision making be considered in other regions and that the road planning criteria identified in this study may be useful.

  9. Multi-Objective Planning Techniques in Distribution Networks: A Composite Review

    Directory of Open Access Journals (Sweden)

    Syed Ali Abbas Kazmi

    2017-02-01

    Full Text Available Distribution networks (DNWs are facing numerous challenges, notably growing load demands, environmental concerns, operational constraints and expansion limitations with the current infrastructure. These challenges serve as a motivation factor for various distribution network planning (DP strategies, such as timely addressing load growth aiming at prominent objectives such as reliability, power quality, economic viability, system stability and deferring costly reinforcements. The continuous transformation of passive to active distribution networks (ADN needs to consider choices, primarily distributed generation (DG, network topology change, installation of new protection devices and key enablers as planning options in addition to traditional grid reinforcements. Since modern DP (MDP in deregulated market environments includes multiple stakeholders, primarily owners, regulators, operators and consumers, one solution fit for all planning scenarios may not satisfy all these stakeholders. Hence, this paper presents a review of several planning techniques (PTs based on mult-objective optimizations (MOOs in DNWs, aiming at better trade-off solutions among conflicting objectives and satisfying multiple stakeholders. The PTs in the paper spread across four distinct planning classifications including DG units as an alternative to costly reinforcements, capacitors and power electronic devices for ensuring power quality aspects, grid reinforcements, expansions, and upgrades as a separate category and network topology alteration and reconfiguration as a viable planning option. Several research works associated with multi-objective planning techniques (MOPT have been reviewed with relevant models, methods and achieved objectives, abiding with system constraints. The paper also provides a composite review of current research accounts and interdependence of associated components in the respective classifications. The potential future planning areas, aiming at

  10. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  11. Pareto navigation-algorithmic foundation of interactive multi-criteria IMRT planning

    International Nuclear Information System (INIS)

    Monz, M; Kuefer, K H; Bortfeld, T R; Thieke, C

    2008-01-01

    Inherently, IMRT treatment planning involves compromising between different planning goals. Multi-criteria IMRT planning directly addresses this compromising and thus makes it more systematic. Usually, several plans are computed from which the planner selects the most promising following a certain procedure. Applying Pareto navigation for this selection step simultaneously increases the variety of planning options and eases the identification of the most promising plan. Pareto navigation is an interactive multi-criteria optimization method that consists of the two navigation mechanisms 'selection' and 'restriction'. The former allows the formulation of wishes whereas the latter allows the exclusion of unwanted plans. They are realized as optimization problems on the so-called plan bundle-a set constructed from pre-computed plans. They can be approximately reformulated so that their solution time is a small fraction of a second. Thus, the user can be provided with immediate feedback regarding his or her decisions. Pareto navigation was implemented in the MIRA navigator software and allows real-time manipulation of the current plan and the set of considered plans. The changes are triggered by simple mouse operations on the so-called navigation star and lead to real-time updates of the navigation star and the dose visualizations. Since any Pareto-optimal plan in the plan bundle can be found with just a few navigation operations the MIRA navigator allows a fast and directed plan determination. Besides, the concept allows for a refinement of the plan bundle, thus offering a middle course between single plan computation and multi-criteria optimization. Pareto navigation offers so far unmatched real-time interactions, ease of use and plan variety, setting it apart from the multi-criteria IMRT planning methods proposed so far

  12. Pareto navigation: algorithmic foundation of interactive multi-criteria IMRT planning.

    Science.gov (United States)

    Monz, M; Küfer, K H; Bortfeld, T R; Thieke, C

    2008-02-21

    Inherently, IMRT treatment planning involves compromising between different planning goals. Multi-criteria IMRT planning directly addresses this compromising and thus makes it more systematic. Usually, several plans are computed from which the planner selects the most promising following a certain procedure. Applying Pareto navigation for this selection step simultaneously increases the variety of planning options and eases the identification of the most promising plan. Pareto navigation is an interactive multi-criteria optimization method that consists of the two navigation mechanisms 'selection' and 'restriction'. The former allows the formulation of wishes whereas the latter allows the exclusion of unwanted plans. They are realized as optimization problems on the so-called plan bundle -- a set constructed from pre-computed plans. They can be approximately reformulated so that their solution time is a small fraction of a second. Thus, the user can be provided with immediate feedback regarding his or her decisions. Pareto navigation was implemented in the MIRA navigator software and allows real-time manipulation of the current plan and the set of considered plans. The changes are triggered by simple mouse operations on the so-called navigation star and lead to real-time updates of the navigation star and the dose visualizations. Since any Pareto-optimal plan in the plan bundle can be found with just a few navigation operations the MIRA navigator allows a fast and directed plan determination. Besides, the concept allows for a refinement of the plan bundle, thus offering a middle course between single plan computation and multi-criteria optimization. Pareto navigation offers so far unmatched real-time interactions, ease of use and plan variety, setting it apart from the multi-criteria IMRT planning methods proposed so far.

  13. Distribution Network Expansion Planning Based on Multi-objective PSO Algorithm

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Wu, Qiuwei

    2013-01-01

    This paper presents a novel approach for electrical distribution network expansion planning using multi-objective particle swarm optimization (PSO). The optimization objectives are: investment and operation cost, energy losses cost, and power congestion cost. A two-phase multi-objective PSO...... algorithm was proposed to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of both the proposed multi-objective planning approach and the improved multi-objective PSO have been verified...

  14. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of environmental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Over the past three years, the Five Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. The Five-Year Plan is not exclusively focused on near-term activities. It also expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. This goal was established in response to recommendations from the State and Tribal Government Working Group (STGWG) that DOE define a specific end point for completing necessary remediation and restoration activities. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  15. Multi-annual energy plan 2016/2018/2019/2023 of Guadeloupe. Decree no. 2017-570 from april 19, 2017 relating to the multi-annual energy plan of Guadeloupe

    International Nuclear Information System (INIS)

    2017-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Guadeloupe island (French West Indies). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  16. Multi-Year Program under Budget Constraints Using Multi-Criteria Analysis

    Directory of Open Access Journals (Sweden)

    Surya Adiguna

    2017-09-01

    Full Text Available Road investment appraisal requires joint consideration of multiple criteria which are related to engineering, economic, social and environmental impacts. The investment consideration could be based on the economic analysis but however for some factors, such as environmental, social, and political, are difficult to quantify in monetary term. The multi-criteria analysis is the alternative tool which caters the requirements of the issues above. The research, which is based on 102 class D and class E paved road sections in Kenya, is about to optimize road network investment under budget constraints by applying a multi-criteria analysis (MCA method and compare it with the conventional economic analysis. The MCA is developed from hierarchy structure which is considered as the analytical framework. The framework is based on selected criteria and weights which are assigned from Kenya road policy. The HDM-4 software is applied as decision-making tool to obtain the best investment alternatives and road work programs from both MCA and economic analysis. The road work programs will be the results from the analysis using both MCA and economic analysis within HDM-4 software to see the difference and compare the results between both programs. The results from MCA show 51 road sections need periodic work, which is overlay or resealing. Meanwhile, 51 others need rehabilitation or reconstruction. The five years road work program which based on economic analysis result shows that it costs almost Kenyan Shilling (KES 130 billion to maintain the class D and E paved road in Kenya. Meanwhile, the MCA only requires KES 59.5 billion for 5 years program. These results show huge margin between two analyses and somehow MCA result provides more efficient work program compared to economic analysis.

  17. Multi-objective and multi-criteria optimization for power generation expansion planning with CO2 mitigation in Thailand

    Directory of Open Access Journals (Sweden)

    Kamphol Promjiraprawat

    2013-06-01

    Full Text Available In power generation expansion planning, electric utilities have encountered the major challenge of environmental awareness whilst being concerned with budgetary burdens. The approach for selecting generating technologies should depend on economic and environmental constraint as well as externalities. Thus, the multi-objective optimization becomes a more attractive approach. This paper presents a hybrid framework of multi-objective optimization and multi-criteria decision making to solve power generation expansion planning problems in Thailand. In this paper, CO2 emissions and external cost are modeled as a multi-objective optimization problem. Then the analytic hierarchy process is utilized to determine thecompromised solution. For carbon capture and storage technology, CO2 emissions can be mitigated by 74.7% from the least cost plan and leads to the reduction of the external cost of around 500 billion US dollars over the planning horizon. Results indicate that the proposed approach provides optimum cost-related CO2 mitigation plan as well as external cost.

  18. Sustainable Multi-Product Seafood Production Planning Under Uncertainty

    International Nuclear Information System (INIS)

    Simanjuntak, Ruth; Mawengkang, Herman; Sembiring, Monalisa; Sinaga, Rani; Pakpahan, Endang J

    2013-01-01

    A multi-product fish production planning produces simultaneously multi fish products from several classes of raw resources. The goal in sustainable production planning is to meet customer demand over a fixed time horizon divided into planning periods by optimizing the tradeoff between economic objectives such as production cost, waste processed cost, and customer satisfaction level. The major decisions are production and inventory levels for each product and the number of workforce in each planning period. In this paper we consider the management of small scale traditional business at North Sumatera Province which performs processing fish into several local seafood products. The inherent uncertainty of data (e.g. demand, fish availability), together with the sequential evolution of data over time leads the sustainable production planning problem to a nonlinear mixed-integer stochastic programming model. We use scenario generation based approach and feasible neighborhood search for solving the model.

  19. Use of interactive data visualization in multi-objective forest planning.

    Science.gov (United States)

    Haara, Arto; Pykäläinen, Jouni; Tolvanen, Anne; Kurttila, Mikko

    2018-03-15

    Common to multi-objective forest planning situations is that they all require comparisons, searches and evaluation among decision alternatives. Through these actions, the decision maker can learn from the information presented and thus make well-justified decisions. Interactive data visualization is an evolving approach that supports learning and decision making in multidimensional decision problems and planning processes. Data visualization contributes the formation of mental image data and this process is further boosted by allowing interaction with the data. In this study, we introduce a multi-objective forest planning decision problem framework and the corresponding characteristics of data. We utilize the framework with example planning data to illustrate and evaluate the potential of 14 interactive data visualization techniques to support multi-objective forest planning decisions. Furthermore, broader utilization possibilities of these techniques to incorporate the provisioning of ecosystem services into forest management and planning are discussed. Copyright © 2018 Elsevier Ltd. All rights reserved.

  20. MOPSO-based multi-objective TSO planning considering uncertainties

    DEFF Research Database (Denmark)

    Wang, Qi; Zhang, Chunyu; Ding, Yi

    2014-01-01

    factors, i.e. load growth, generation capacity and line faults, and aims to enhance the transmission system via the multi-objective TSO planning (MOTP) approach. The proposed MOTP approach optimizes three objectives simultaneously, namely the probabilistic available transfer capability (PATC), investment...... cost and power outage cost. A two-phase MOPSO algorithm is employed to solve this optimization problem, which can accelerate the convergence and guarantee the diversity ofPareto-optimal front set as well. The feasibility and effectiveness of both the proposed multi-objective planning approach...

  1. Improving the Psychosocial Work Environment at Multi-Ethnic Workplaces: A Multi-Component Intervention Strategy in the Cleaning Industry

    OpenAIRE

    Smith, Louise Hardman; Hviid, Kirsten; Frydendall, Karen Bo; Flyvholm, Mari-Ann

    2013-01-01

    Global labour migration has increased in recent years and immigrant workers are often recruited into low status and low paid jobs such as cleaning. Research in a Danish context shows that immigrants working in the cleaning industry often form social networks based on shared languages and backgrounds, and that conflict between different ethnic groups may occur. This paper evaluates the impact of a multi-component intervention on the psychosocial work environment at a multi-ethnic Danish workpl...

  2. 0-6683 : develop a pavement project evaluation index to support the 4-year pavement management plan.

    Science.gov (United States)

    2013-08-01

    A pavement management plan (PMP) identifies : candidate maintenance and rehabilitation (M&R) : projects for a particular roadway network over a : multi-year planning period. The PMP is a living : document because projects are reevaluated and : reprio...

  3. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.

  4. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ''Draft'' Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ''Draft'' MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million

  5. Multi-annual energy plan 2016-2018 and 2019-2023 of French Guiana

    International Nuclear Information System (INIS)

    2016-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for French Guiana overseas region. It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  6. Multi-Institution Research Centers: Planning and Management Challenges

    Science.gov (United States)

    Spooner, Catherine; Lavey, Lisa; Mukuka, Chilandu; Eames-Brown, Rosslyn

    2016-01-01

    Funding multi-institution centers of research excellence (CREs) has become a common means of supporting collaborative partnerships to address specific research topics. However, there is little guidance for those planning or managing a multi-institution CRE, which faces specific challenges not faced by single-institution research centers. We…

  7. A qualitative investigation of Foundation Year 2 doctors' views on the European Working Time Directive.

    Science.gov (United States)

    Duncan, Myanna; Haslam, Cheryl

    2015-01-01

    PURPOSE - The purpose of this paper is to examine the personal views and experiences of Foundation Year 2 doctors operating under the European Working Time Directive (EWTD). DESIGN/METHODOLOGY/APPROACH - In total, 36 Foundation Year 2 doctors from a single UK-based Deanery participated in this semistructured interview study. FINDINGS - Findings indicated that Foundation doctors typically welcomed a regulation of working hours, but reported frustration at the manner in which the Directive had been implemented. Participants reported concerns at reducing hours by removing out-of-hours working in order to meet EWTD requirements. Out-of-hours shifts were highly valued owing to their increased opportunities for autonomous clinical decision making. By contrast, day-shifts were regarded as heavily administrative in nature and were perceived as service provision. Foundation doctors discussed the unique nature of the out-of-hours working period which appeared to provide specific learning opportunities as doctors draw on time management and prioritisation skills. ORIGINALITY/VALUE - Given the challenges the EWTD presents, careful rota planning is essential. First, the authors would encourage the restructuring of day-shift work to provide a greater emphasis on hands-on skills experience in a supportive, supervised environment. Second, where possible, Foundation doctors might benefit from the opportunity to engage in some out-of-hours working, such as with multi-professional "Hospital at Night" teams. Third, the authors would encourage junior doctor involvement in rota design and planning which may increase their perceived autonomy and therefore buy-in of working practices.

  8. Optimal Multi-Level Lot Sizing for Requirements Planning Systems

    OpenAIRE

    Earle Steinberg; H. Albert Napier

    1980-01-01

    The wide spread use of advanced information systems such as Material Requirements Planning (MRP) has significantly altered the practice of dependent demand inventory management. Recent research has focused on development of multi-level lot sizing heuristics for such systems. In this paper, we develop an optimal procedure for the multi-period, multi-product, multi-level lot sizing problem by modeling the system as a constrained generalized network with fixed charge arcs and side constraints. T...

  9. A Resource Logic for Multi-Agent Plan Merging

    NARCIS (Netherlands)

    De Weerdt, M.M.; Bos, A.; Tonino, H.; Witteveen, C.

    2003-01-01

    In a multi-agent system, agents are carrying out certain tasks by executing plans. Consequently, the problem of finding a plan, given a certain goal, has been given a lot of attention in the literature. Instead of concentrating on this problem, the focus of this paper is on cooperation between

  10. Integrated production planning and control: A multi-objective optimization model

    Directory of Open Access Journals (Sweden)

    Cheng Wang

    2013-09-01

    Full Text Available Purpose: Production planning and control has crucial impact on the production and business activities of enterprise. Enterprise Resource Planning (ERP is the most popular resources planning and management system, however there are some shortcomings and deficiencies in the production planning and control because its core component is still the Material Requirements Planning (MRP. For the defects of ERP system, many local improvement and optimization schemes have been proposed, and improve the feasibility and practicality of the plan in some extent, but study considering the whole planning system optimization in the multiple performance management objectives and achieving better application performance is less. The purpose of this paper is to propose a multi-objective production planning optimization model Based on the point of view of the integration of production planning and control, in order to achieve optimization and control of enterprise manufacturing management. Design/methodology/approach: On the analysis of ERP planning system’s defects and disadvantages, and related research and literature, a multi-objective production planning optimization model is proposed, in addition to net demand and capacity, multiple performance management objectives, such as on-time delivery, production balance, inventory, overtime production, are considered incorporating into the examination scope of the model, so that the manufacturing process could be management and controlled Optimally between multiple objectives. The validity and practicability of the model will be verified by the instance in the last part of the paper. Findings: The main finding is that production planning management of manufacturing enterprise considers not only the capacity and materials, but also a variety of performance management objectives in the production process, and building a multi-objective optimization model can effectively optimize the management and control of enterprise

  11. Fiscal year 1998 multi-year work plan. Advanced reactors transition program

    International Nuclear Information System (INIS)

    Gantt, D.A.

    1997-01-01

    The mission of the Advanced Reactors Transition program is two-fold. First, the program is to maintain the Fast Flux Test Facility (FFTF) and the Fuels and Materials Examination Facility (FMEF) in Standby to support a possible future role in the tritium production strategy. Secondly, the program is to continue deactivation activities which do not conflict with the Standby directive. On-going deactivation activities include the processing of non-usable, irradiated, FFTF components for storage or disposal; deactivation of Nuclear Energy legacy test facilities; and deactivation of the Plutonium Recycle Test Reactor (PRTR) facility, 309 Building

  12. Fiscal year 1999 multi-year work plan, advanced reactors transition program

    International Nuclear Information System (INIS)

    Gantt, D.A.

    1998-01-01

    The Advanced Reactors Transition (ART) has two missions. One, funded by DOE-EM is to transition assigned, surplus facilities to a safe and compliant, low-cost stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D and D. Facilities to be transitioned include the 309 Building/Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy (NE) Legacy Facilities. The second mission, funded by DOE-NE, is to maintain the Fast Flux Test Facility (FFTF) and affiliated 400 Area buildings in a safe and compliant standby condition. The condition of the plant hardware, software and personnel is to be preserved in a manner not to preclude a plant restart

  13. Fiscal year 1999 multi-year work plan, advanced reactors transition program

    Energy Technology Data Exchange (ETDEWEB)

    Gantt, D.A.

    1998-09-17

    The Advanced Reactors Transition (ART) has two missions. One, funded by DOE-EM is to transition assigned, surplus facilities to a safe and compliant, low-cost stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D and D. Facilities to be transitioned include the 309 Building/Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy (NE) Legacy Facilities. The second mission, funded by DOE-NE, is to maintain the Fast Flux Test Facility (FFTF) and affiliated 400 Area buildings in a safe and compliant standby condition. The condition of the plant hardware, software and personnel is to be preserved in a manner not to preclude a plant restart.

  14. Technical Support Section annual work plan for FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1997-12-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.

  15. Biodiversity conservation in Swedish forests: ways forward for a 30-year-old multi-scaled approach.

    Science.gov (United States)

    Gustafsson, Lena; Perhans, Karin

    2010-12-01

    A multi-scaled model for biodiversity conservation in forests was introduced in Sweden 30 years ago, which makes it a pioneer example of an integrated ecosystem approach. Trees are set aside for biodiversity purposes at multiple scale levels varying from individual trees to areas of thousands of hectares, with landowner responsibility at the lowest level and with increasing state involvement at higher levels. Ecological theory supports the multi-scaled approach, and retention efforts at every harvest occasion stimulate landowners' interest in conservation. We argue that the model has large advantages but that in a future with intensified forestry and global warming, development based on more progressive thinking is necessary to maintain and increase biodiversity. Suggestions for the future include joint planning for several forest owners, consideration of cost-effectiveness, accepting opportunistic work models, adjusting retention levels to stand and landscape composition, introduction of temporary reserves, creation of "receiver habitats" for species escaping climate change, and protection of young forests.

  16. NSGA-II algorithm for multi-objective generation expansion planning problem

    Energy Technology Data Exchange (ETDEWEB)

    Murugan, P.; Kannan, S. [Electronics and Communication Engineering Department, Arulmigu Kalasalingam College of Engineering, Krishnankoil 626190, Tamilnadu (India); Baskar, S. [Electrical Engineering Department, Thiagarajar College of Engineering, Madurai 625015, Tamilnadu (India)

    2009-04-15

    This paper presents an application of Elitist Non-dominated Sorting Genetic Algorithm version II (NSGA-II), to multi-objective generation expansion planning (GEP) problem. The GEP problem is considered as a two-objective problem. The first objective is the minimization of investment cost and the second objective is the minimization of outage cost (or maximization of reliability). To improve the performance of NSGA-II, two modifications are proposed. One modification is incorporation of Virtual Mapping Procedure (VMP), and the other is introduction of controlled elitism in NSGA-II. A synthetic test system having 5 types of candidate units is considered here for GEP for a 6-year planning horizon. The effectiveness of the proposed modifications is illustrated in detail. (author)

  17. Cooperative epistemic multi-agent planning for implicit coordination

    DEFF Research Database (Denmark)

    Engesser, Thorsten; Bolander, Thomas; Mattmüller, Robert

    2017-01-01

    framework to include perspective shifts, allowing us to define new notions of sequential and conditional planning with implicit coordination. With these, it is possible to solve planning tasks with joint goals in a decentralized manner without the agents having to negotiate about and commit to a joint...... policy at plan time. First we define the central planning notions and sketch the implementation of a planning system built on those notions. Afterwards we provide some case studies in order to evaluate the planner empirically and to show that the concept is useful for multi-agent systems in practice....

  18. Indoor climate, psychosocial work environment and symptoms in open-plan offices

    DEFF Research Database (Denmark)

    Pejtersen, J; Allermann, L; Kristensen, T S

    2006-01-01

    To study the indoor climate, the psychosocial work environment and occupants' symptoms in offices a cross-sectional questionnaire survey was made in 11 naturally and 11 mechanically ventilated office buildings. Nine of the buildings had mainly cellular offices; five of the buildings had mainly open...... irritation, skin irritation, central nervous system (CNS) symptoms and psychosocial factors. Occupants in open-plan offices are more likely to perceive thermal discomfort, poor air quality and noise and they more frequently complain about CNS and mucous membrane symptoms than occupants in multi......-person and cellular offices. The association between psychosocial factors and office size was weak. Open-plan offices may not be suited for all job types. PRACTICAL IMPLICATION: Open-plan offices may be a risk factor for adverse environmental perceptions and symptoms....

  19. Senior dental students' career intentions, work-life balance and retirement plans.

    Science.gov (United States)

    Stewart, F M J; Drummond, J R; Carson, L; Theaker, E D

    2007-09-08

    To gather information from senior dental students about their future career plans, with particular emphasis on work-life balance issues, their attitudes towards the NHS and retirement plans. Senior dental students at the Universities of Dundee and Manchester were asked to complete a voluntary anonymous questionnaire. In all 141 questionnaires were completed, 42 by students in Manchester and 114 in Dundee. On qualification nearly all surveyed intend to work full time but after five years one quarter (26%) of females intend to work part time. This is significantly (p work full time. Although the majority (65%) intend to work in general practice significant numbers (19%) wish to have a career in hospital dentistry and very few (3%) in community dentistry. Senior students seem to show no more commitment to the NHS than those in our previous study of dental school applicants. Only 3% intend to work exclusively for the NHS and 18% intend to work exclusively in the private sector. Surprising numbers had plans to retire or go part time before 60 years of age. Only 20% of the sample intended to continue working full time after the age of 60 years. The mode age that those surveyed intended to start a family was 30 years and a large majority of both sexes thought this would interrupt their professional life. More than half of the sample intend to take time out of dentistry until their children attended primary school (female 63%, male 38%) and 6% (female 6%, male 8%) until secondary school. Many of our findings suggest that future generations of dentists may have a pattern of professional life that will have the effect of reducing their clinical commitment, although it is not possible to determine how significant an effect this will have on the workforce. It may, however, be appropriate to take career intention into account when workforce planning.

  20. A Mission Planning Approach for Precision Farming Systems Based on Multi-Objective Optimization

    Directory of Open Access Journals (Sweden)

    Zhaoyu Zhai

    2018-06-01

    Full Text Available As the demand for food grows continuously, intelligent agriculture has drawn much attention due to its capability of producing great quantities of food efficiently. The main purpose of intelligent agriculture is to plan agricultural missions properly and use limited resources reasonably with minor human intervention. This paper proposes a Precision Farming System (PFS as a Multi-Agent System (MAS. Components of PFS are treated as agents with different functionalities. These agents could form several coalitions to complete the complex agricultural missions cooperatively. In PFS, mission planning should consider several criteria, like expected benefit, energy consumption or equipment loss. Hence, mission planning could be treated as a Multi-objective Optimization Problem (MOP. In order to solve MOP, an improved algorithm, MP-PSOGA, is proposed, taking advantages of the Genetic Algorithms and Particle Swarm Optimization. A simulation, called precise pesticide spraying mission, is performed to verify the feasibility of the proposed approach. Simulation results illustrate that the proposed approach works properly. This approach enables the PFS to plan missions and allocate scarce resources efficiently. The theoretical analysis and simulation is a good foundation for the future study. Once the proposed approach is applied to a real scenario, it is expected to bring significant economic improvement.

  1. MULTI-CRITERIA PROGRAMMING METHODS AND PRODUCTION PLAN OPTIMIZATION PROBLEM SOLVING IN METAL INDUSTRY

    OpenAIRE

    Tunjo Perić; Željko Mandić

    2017-01-01

    This paper presents the production plan optimization in the metal industry considered as a multi-criteria programming problem. We first provided the definition of the multi-criteria programming problem and classification of the multicriteria programming methods. Then we applied two multi-criteria programming methods (the STEM method and the PROMETHEE method) in solving a problem of multi-criteria optimization production plan in a company from the metal industry. The obtained resul...

  2. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Appendix A

    International Nuclear Information System (INIS)

    1995-09-01

    This document is a compilation of data relating to the Tank Waste Remediation System Multi-Year Program. Topics discussed include: management systems; waste volume, transfer and evaporation management; transition of 200 East and West areas; ferricyanide, volatile organic vapor, and flammable gas management; waste characterization; retrieval from SSTs and DSTs; heat management; interim storage; low-level and high-level radioactive waste management; and tank farm closure

  3. Optimized production planning model for a multi-plant cultivation system under uncertainty

    Science.gov (United States)

    Ke, Shunkui; Guo, Doudou; Niu, Qingliang; Huang, Danfeng

    2015-02-01

    An inexact multi-constraint programming model under uncertainty was developed by incorporating a production plan algorithm into the crop production optimization framework under the multi-plant collaborative cultivation system. In the production plan, orders from the customers are assigned to a suitable plant under the constraints of plant capabilities and uncertainty parameters to maximize profit and achieve customer satisfaction. The developed model and solution method were applied to a case study of a multi-plant collaborative cultivation system to verify its applicability. As determined in the case analysis involving different orders from customers, the period of plant production planning and the interval between orders can significantly affect system benefits. Through the analysis of uncertain parameters, reliable and practical decisions can be generated using the suggested model of a multi-plant collaborative cultivation system.

  4. Half-liter supernatant sampler system engineering work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial Pretreatment Module (IPM), requires samples of supernatants and sludges from 200 Area tank farms for planned hot testing work in support of IPM design. The IPM project has proposed the development of several new sampler systems. These systems include a 0.5-l supernatant sampler, 3-l and 25-l supernatant and sludge samplers, and a 4,000-l sampler system. The 0.5-l sampler will support IPM sampling needs in the 1 to 3 l range starting in late fiscal year 1995. This sampler is intended to be used in conjunction with the existing 100 ml bottle-on-a-string. The 3-l and 25-l systems will be based on the Savannah River Site's sampler system and will support IPM sampling needs in the 3 to 100 liter range. Most of the hot testing required for design of the IPM must be accomplished in the next 3 years. This work plan defines the tasks associated with the development of a 0.5-l sampler system. This system will be referred to as the Half-Liter Supernatant Sampler System (HLSSS). Specifically, this work plan will define the scope of work, identify organizational responsibilities, identify major technical requirements, describe configuration control and verification requirements, and provide estimated costs and schedule. The sampler system will be fully operational, including trained staff and operating procedures, upon completion of this task

  5. Distributed Market-Based Algorithms for Multi-Agent Planning with Shared Resources

    Science.gov (United States)

    2013-02-01

    1 Introduction 1 2 Distributed Market-Based Multi-Agent Planning 5 2.1 Problem Formulation...over the deterministic planner, on the “test set” of scenarios with changing economies. . . 50 xi xii Chapter 1 Introduction Multi-agent planning is...representation of the objective (4.2.1). For example, for the supply chain mangement problem, we assumed a sequence of Bernoulli coin flips, which seems

  6. Cooperative Path-Planning for Multi-Vehicle Systems

    Directory of Open Access Journals (Sweden)

    Qichen Wang

    2014-11-01

    Full Text Available In this paper, we propose a collision avoidance algorithm for multi-vehicle systems, which is a common problem in many areas, including navigation and robotics. In dynamic environments, vehicles may become involved in potential collisions with each other, particularly when the vehicle density is high and the direction of travel is unrestricted. Cooperatively planning vehicle movement can effectively reduce and fairly distribute the detour inconvenience before subsequently returning vehicles to their intended paths. We present a novel method of cooperative path planning for multi-vehicle systems based on reinforcement learning to address this problem as a decision process. A dynamic system is described as a multi-dimensional space formed by vectors as states to represent all participating vehicles’ position and orientation, whilst considering the kinematic constraints of the vehicles. Actions are defined for the system to transit from one state to another. In order to select appropriate actions whilst satisfying the constraints of path smoothness, constant speed and complying with a minimum distance between vehicles, an approximate value function is iteratively developed to indicate the desirability of every state-action pair from the continuous state space and action space. The proposed scheme comprises two phases. The convergence of the value function takes place in the former learning phase, and it is then used as a path planning guideline in the subsequent action phase. This paper summarizes the concept and methodologies used to implement this online cooperative collision avoidance algorithm and presents results and analysis regarding how this cooperative scheme improves upon two baseline schemes where vehicles make movement decisions independently.

  7. Multi Sector Planning Tools for Trajectory-Based Operations

    Science.gov (United States)

    Prevot, Thomas; Mainini, Matthew; Brasil, Connie

    2010-01-01

    This paper discusses a suite of multi sector planning tools for trajectory-based operations that were developed and evaluated in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center. The toolset included tools for traffic load and complexity assessment as well as trajectory planning and coordination. The situation assessment tools included an integrated suite of interactive traffic displays, load tables, load graphs, and dynamic aircraft filters. The planning toolset allowed for single and multi aircraft trajectory planning and data communication-based coordination of trajectories between operators. Also newly introduced was a real-time computation of sector complexity into the toolset that operators could use in lieu of aircraft count to better estimate and manage sector workload, especially in situations with convective weather. The tools were used during a joint NASA/FAA multi sector planner simulation in the AOL in 2009 that had multiple objectives with the assessment of the effectiveness of the tools being one of them. Current air traffic control operators who were experienced as area supervisors and traffic management coordinators used the tools throughout the simulation and provided their usefulness and usability ratings in post simulation questionnaires. This paper presents these subjective assessments as well as the actual usage data that was collected during the simulation. The toolset was rated very useful and usable overall. Many elements received high scores by the operators and were used frequently and successfully. Other functions were not used at all, but various requests for new functions and capabilities were received that could be added to the toolset.

  8. Improving the Psychosocial Work Environment at Multi-Ethnic Workplaces: A Multi-Component Intervention Strategy in the Cleaning Industry

    Directory of Open Access Journals (Sweden)

    Mari-Ann Flyvholm

    2013-10-01

    Full Text Available Global labour migration has increased in recent years and immigrant workers are often recruited into low status and low paid jobs such as cleaning. Research in a Danish context shows that immigrants working in the cleaning industry often form social networks based on shared languages and backgrounds, and that conflict between different ethnic groups may occur. This paper evaluates the impact of a multi-component intervention on the psychosocial work environment at a multi-ethnic Danish workplace in the cleaning sector. The intervention included Danish lessons, vocational training courses, and activities to improve collaboration across different groups of cleaners. Interviews about the outcome of the intervention were conducted with the cleaners and their supervisor. The Copenhagen Psychosocial Questionnaire was used as a supplement to the interviews. The results suggest that the psychosocial work environment had improved after the intervention. According to the interviews with the cleaners, the intervention had led to improved communication, trust, and collaboration. These findings are supported by the questionnaire where social support from supervisor and colleagues, social community, trust, and teamwork seem to have improved together with meaning of work, rewards, and emotional demands. The design of the intervention may provide inspiration for future psychosocial work environment interventions at multi-ethnic work places.

  9. Improving the psychosocial work environment at multi-ethnic workplaces: a multi-component intervention strategy in the cleaning industry.

    Science.gov (United States)

    Smith, Louise Hardman; Hviid, Kirsten; Frydendall, Karen Bo; Flyvholm, Mari-Ann

    2013-10-14

    Global labour migration has increased in recent years and immigrant workers are often recruited into low status and low paid jobs such as cleaning. Research in a Danish context shows that immigrants working in the cleaning industry often form social networks based on shared languages and backgrounds, and that conflict between different ethnic groups may occur. This paper evaluates the impact of a multi-component intervention on the psychosocial work environment at a multi-ethnic Danish workplace in the cleaning sector. The intervention included Danish lessons, vocational training courses, and activities to improve collaboration across different groups of cleaners. Interviews about the outcome of the intervention were conducted with the cleaners and their supervisor. The Copenhagen Psychosocial Questionnaire was used as a supplement to the interviews. The results suggest that the psychosocial work environment had improved after the intervention. According to the interviews with the cleaners, the intervention had led to improved communication, trust, and collaboration. These findings are supported by the questionnaire where social support from supervisor and colleagues, social community, trust, and teamwork seem to have improved together with meaning of work, rewards, and emotional demands. The design of the intervention may provide inspiration for future psychosocial work environment interventions at multi-ethnic work places.

  10. Multi-agent Cooperation in a Planning Framework

    NARCIS (Netherlands)

    De Weerdt, M.M.; Bos, A.; Tonino, J.F.M.; Witteveen, C.

    2000-01-01

    The promise of multi-agent systems is that multiple agents can solve problems more efficiently than single agents can. In this paper we propose a method to implement cooperation between agents in the planning phase, in order to achive more cost-effective solutions than without cooperation. Two

  11. Liquid effluent/Hanford Environmental compliance FY 1995 Multi-Year Program Plan/Fiscal Year Work Plan, WBS 1.2.2.1 and 1.2.2.2

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This document details the program effort to eliminate the use of the soil column for liquid effluent treatment and to manage current and future liquid effluent streams at the Hanford Site, in a safe responsible cost effective and legally compliant mannger. This should be achieved through planning, public and stakeholder interaction, definition of requiremtns for generators, and provision of timely treatment, stroage, disposal capability, and waste minimization of waste streams.

  12. Liquid effluent/Hanford Environmental compliance FY 1995 Multi-Year Program Plan/Fiscal Year Work Plan, WBS 1.2.2.1 and 1.2.2.2

    International Nuclear Information System (INIS)

    1994-09-01

    This document details the program effort to eliminate the use of the soil column for liquid effluent treatment and to manage current and future liquid effluent streams at the Hanford Site, in a safe responsible cost effective and legally compliant mannger. This should be achieved through planning, public and stakeholder interaction, definition of requiremtns for generators, and provision of timely treatment, stroage, disposal capability, and waste minimization of waste streams

  13. MULTI-CRITERIA PROGRAMMING METHODS AND PRODUCTION PLAN OPTIMIZATION PROBLEM SOLVING IN METAL INDUSTRY

    Directory of Open Access Journals (Sweden)

    Tunjo Perić

    2017-09-01

    Full Text Available This paper presents the production plan optimization in the metal industry considered as a multi-criteria programming problem. We first provided the definition of the multi-criteria programming problem and classification of the multicriteria programming methods. Then we applied two multi-criteria programming methods (the STEM method and the PROMETHEE method in solving a problem of multi-criteria optimization production plan in a company from the metal industry. The obtained results indicate a high efficiency of the applied methods in solving the problem.

  14. Dynamic supply chain network design with capacity planning and multi-period pricing

    DEFF Research Database (Denmark)

    Fattahi, Mohammad; Mahootchi, Masoud; Govindan, Kannan

    2015-01-01

    This paper addresses a new problem in designing and planning a multi-echelon and multi-product supply chain network over a multi-period horizon in which customer zones have price-sensitive demands. Based on price-demand relationships, a generic method is presented to obtain price levels...... for products and then, a mixed-integer linear programming model is developed. Due to the problem intractability, a simulated annealing algorithm that uses some developed linear relaxation-based heuristics for capacity planning and pricing is presented. Numerical results demonstrate the significance...

  15. Management of complex knowledge in planning for sustainable development: The use of multi-criteria decision aids

    International Nuclear Information System (INIS)

    Kain, Jaan-Henrik; Soederberg, Henriette

    2008-01-01

    The vision of sustainable development entails new and complex planning situations, confronting local policy makers with changing political conditions, different content in decision making and planning and new working methods. Moreover, the call for sustainable development has been a major driving force towards an increasingly multi-stakeholder planning system. This situation requires competence in working in, and managing, groups of actors, including not only experts and project owners but also other categories of stakeholders. Among other qualities, such competence requires a working strategy aimed at integrating various, and sometimes incommensurable, forms of knowledge to construct a relevant and valid knowledge base prior to decision making. Consequently, there lies great potential in methods that facilitate the evaluation of strategies for infrastructural development across multiple knowledge areas, so-called multi-criteria decision aids (MCDAs). In the present article, observations from six case studies are discussed, where the common denominators are infrastructural planning, multi-stakeholder participation and the use of MCDAs as interactive decision support. Three MCDAs are discussed - NAIADE, SCA and STRAD - with an emphasis on how they function in their procedural context. Accordingly, this is not an analysis of MCDA algorithms, of software programming aspects or of MCDAs as context-independent 'decision machines'-the focus is on MCDAs as actor systems, not as expert systems. The analysis is carried out across four main themes: (a) symmetrical management of different forms of knowledge; (b) management of heterogeneity, pluralism and conflict; (c) functionality and ease of use; and (d) transparency and trust. It shows that STRAD, by far, seems to be the most useful MCDA in interactive settings. NAIADE and SCA are roughly equivalent but have their strengths and weaknesses in different areas. Moreover, it was found that some MCDA issues require further

  16. Generalizable open source urban water portfolio simulation framework demonstrated using a multi-objective risk-based planning benchmark problem.

    Science.gov (United States)

    Trindade, B. C.; Reed, P. M.

    2017-12-01

    The growing access and reduced cost for computing power in recent years has promoted rapid development and application of multi-objective water supply portfolio planning. As this trend continues there is a pressing need for flexible risk-based simulation frameworks and improved algorithm benchmarking for emerging classes of water supply planning and management problems. This work contributes the Water Utilities Management and Planning (WUMP) model: a generalizable and open source simulation framework designed to capture how water utilities can minimize operational and financial risks by regionally coordinating planning and management choices, i.e. making more efficient and coordinated use of restrictions, water transfers and financial hedging combined with possible construction of new infrastructure. We introduce the WUMP simulation framework as part of a new multi-objective benchmark problem for planning and management of regionally integrated water utility companies. In this problem, a group of fictitious water utilities seek to balance the use of the mentioned reliability driven actions (e.g., restrictions, water transfers and infrastructure pathways) and their inherent financial risks. Several traits of this problem make it ideal for a benchmark problem, namely the presence of (1) strong non-linearities and discontinuities in the Pareto front caused by the step-wise nature of the decision making formulation and by the abrupt addition of storage through infrastructure construction, (2) noise due to the stochastic nature of the streamflows and water demands, and (3) non-separability resulting from the cooperative formulation of the problem, in which decisions made by stakeholder may substantially impact others. Both the open source WUMP simulation framework and its demonstration in a challenging benchmarking example hold value for promoting broader advances in urban water supply portfolio planning for regions confronting change.

  17. TRUE multi-annual energy planning

    International Nuclear Information System (INIS)

    Bringault, Anne; Cormier, Cyrille; Arditi, Maryse

    2016-01-01

    A multi-annual energy planning (PPE) has been introduced by the French government to transcribe the objectives of the law on energy transition into evolutions for energy consumption and production for different periods (2016-2018 and 2019-2023). This publication first indicates various assessments for these periods regarding energy consumption, electricity consumption, fossil energy consumption, renewable energy production, the share of electric renewable energies, and the decrease of the nuclear share. These objectives are then discussed with respect to different scenarios, and notably a reference scenario

  18. Planned Parenthood works with Korean government.

    Science.gov (United States)

    Yang, J M

    1968-01-01

    In early 1961 special representatives of the International Planned Parenthood Federation (IPPF) organized the Planned Parenthood Federation of Korea (PPFK). The leaders, mostly young university professors, physicians, and government officials well recognized in the fields of public health gynecology/obstetrics, pediatrics, nursing, sociology, social work, and economics, shared an interest in improving the national economy, the national welfare, countermeasures against the population crisis, and the urgent need for family planning services in Korea. The leadership of General Park Chung-hee led to adoption of a national policy in support of family planning at an early stage in November 1961. Since 1961, the government budget for family planning has doubled every year. The PPFK was asked to play a major role in planning, administration, training, information, and education of the national program until the government established the new section of Maternal and Child Health in the Ministry of Health and Social Affairs in 1963. The role of the PPFK has never diminished. The training of family planning personnel at various levels is still carried out entirely by the PPFK. The PPFK operates mobile vans to provide educational activities, IUD insertions, and male sterilization services to people in villages without doctors. The PPFK operates pilot projects to test new methods either in clinics or in the field. The PPFK exists to supplement and cooperate with the government in family planning. With its flexibility, the PPFK team of experts stands ready to provide quick and positive services without red tape.

  19. A multi-period, multi-regional generation expansion planning model incorporating unit commitment constraints

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Georgiadis, Michael C.

    2015-01-01

    Highlights: • A short-term structured investment planning model has been developed. • Unit commitment problem is incorporated into the long-term planning horizon. • Inherent intermittency of renewables is modelled in a comprehensive way. • The impact of CO_2 emission pricing in long-term investment decisions is quantified. • The evolution of system’s marginal price is evaluated for all the planning horizon. - Abstract: This work presents a generic mixed integer linear programming (MILP) model that integrates the unit commitment problem (UCP), i.e., daily energy planning with the long-term generation expansion planning (GEP) framework. Typical daily constraints at an hourly level such as start-up and shut-down related decisions (start-up type, minimum up and down time, synchronization, soak and desynchronization time constraints), ramping limits, system reserve requirements are combined with representative yearly constraints such as power capacity additions, power generation bounds of each unit, peak reserve requirements, and energy policy issues (renewables penetration limits, CO_2 emissions cap and pricing). For modelling purposes, a representative day (24 h) of each month over a number of years has been employed in order to determine the optimal capacity additions, electricity market clearing prices, and daily operational planning of the studied power system. The model has been tested on an illustrative case study of the Greek power system. Our approach aims to provide useful insight into strategic and challenging decisions to be determined by investors and/or policy makers at a national and/or regional level by providing the optimal energy roadmap under real operating and design constraints.

  20. Discrepancies between selected Pareto optimal plans and final deliverable plans in radiotherapy multi-criteria optimization.

    Science.gov (United States)

    Kyroudi, Archonteia; Petersson, Kristoffer; Ghandour, Sarah; Pachoud, Marc; Matzinger, Oscar; Ozsahin, Mahmut; Bourhis, Jean; Bochud, François; Moeckli, Raphaël

    2016-08-01

    Multi-criteria optimization provides decision makers with a range of clinical choices through Pareto plans that can be explored during real time navigation and then converted into deliverable plans. Our study shows that dosimetric differences can arise between the two steps, which could compromise the clinical choices made during navigation. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  1. A multi-stage stochastic transmission expansion planning method

    International Nuclear Information System (INIS)

    Akbari, Tohid; Rahimikian, Ashkan; Kazemi, Ahad

    2011-01-01

    Highlights: → We model a multi-stage stochastic transmission expansion planning problem. → We include available transfer capability (ATC) in our model. → Involving this criterion will increase the ATC between source and sink points. → Power system reliability will be increased and more money can be saved. - Abstract: This paper presents a multi-stage stochastic model for short-term transmission expansion planning considering the available transfer capability (ATC). The ATC can have a huge impact on the power market outcomes and the power system reliability. The transmission expansion planning (TEP) studies deal with many uncertainties, such as system load uncertainties that are considered in this paper. The Monte Carlo simulation method has been applied for generating different scenarios. A scenario reduction technique is used for reducing the number of scenarios. The objective is to minimize the sum of investment costs (IC) and the expected operation costs (OC). The solution technique is based on the benders decomposition algorithm. The N-1 contingency analysis is also done for the TEP problem. The proposed model is applied to the IEEE 24 bus reliability test system and the results are efficient and promising.

  2. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    International Nuclear Information System (INIS)

    Tian, Zhen; Folkerts, Michael; Tan, Jun; Jia, Xun; Jiang, Steve B.; Peng, Fei

    2015-01-01

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques

  3. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    Energy Technology Data Exchange (ETDEWEB)

    Tian, Zhen, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Folkerts, Michael; Tan, Jun; Jia, Xun, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Jiang, Steve B., E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu [Department of Radiation Oncology, University of Texas Southwestern Medical Center, Dallas, Texas 75390 (United States); Peng, Fei [Computer Science Department, Carnegie Mellon University, Pittsburgh, Pennsylvania 15213 (United States)

    2015-06-15

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques.

  4. Coal Power Systems strategic multi-year program plans

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  5. APGEN Scheduling: 15 Years of Experience in Planning Automation

    Science.gov (United States)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  6. Connectivity model for Inter-working multi-hop wireless networks

    CSIR Research Space (South Africa)

    Salami, O

    2009-08-01

    Full Text Available pairs in inter-working multi-hop wireless networks can be evaluated based on the availability of radio links and communication routes. This paper presents an analytical study of the link and route availability in inter-working multi-hop wireless networks....

  7. Geology of Libya Montes and the Interbasin Plains of Northern Tyrrhena Terra, Mars: First Year Results and Second Year Work Plan

    Science.gov (United States)

    Skinner, J. A., Jr.; Rogers, A. D.; Seelos, K. D.

    2010-01-01

    The Libya Montes-Tyrrhena Terra highland-lowland transitional zone of Mars is a complex tectonic and erosional region that contains some of the oldest exposed materials on the Martian surface as well as aqueous mineral signatures that may be potential chemical artifacts of early highland formational processes. Our 1:1M scale mapping project includes the geologic materials and landforms contained within MTMs 00282, -05282, -10282, 00277, - 05277, and -10277, which cover the highland portion of the transitional zone. The map region extends from the Libya Montes southward into Tyrrhena Terra and to the northern rim of Hellas basin and includes volcanic rocks of Syrtis Major Planum and a broad lowlying plain (palus) that forms a topographic divide between Isidis and Hellas basins. The objective of this project is to describe the geologic history of regional massif and plains materials by combining geomorphological and compositional mapping observations. This abstract summarizes the technical approaches and interim scientific results of Year 1 efforts and the expected work plan for Year 2 efforts.

  8. A Generalized Decision Framework Using Multi-objective Optimization for Water Resources Planning

    Science.gov (United States)

    Basdekas, L.; Stewart, N.; Triana, E.

    2013-12-01

    Colorado Springs Utilities (CSU) is currently engaged in an Integrated Water Resource Plan (IWRP) to address the complex planning scenarios, across multiple time scales, currently faced by CSU. The modeling framework developed for the IWRP uses a flexible data-centered Decision Support System (DSS) with a MODSIM-based modeling system to represent the operation of the current CSU raw water system coupled with a state-of-the-art multi-objective optimization algorithm. Three basic components are required for the framework, which can be implemented for planning horizons ranging from seasonal to interdecadal. First, a water resources system model is required that is capable of reasonable system simulation to resolve performance metrics at the appropriate temporal and spatial scales of interest. The system model should be an existing simulation model, or one developed during the planning process with stakeholders, so that 'buy-in' has already been achieved. Second, a hydrologic scenario tool(s) capable of generating a range of plausible inflows for the planning period of interest is required. This may include paleo informed or climate change informed sequences. Third, a multi-objective optimization model that can be wrapped around the system simulation model is required. The new generation of multi-objective optimization models do not require parameterization which greatly reduces problem complexity. Bridging the gap between research and practice will be evident as we use a case study from CSU's planning process to demonstrate this framework with specific competing water management objectives. Careful formulation of objective functions, choice of decision variables, and system constraints will be discussed. Rather than treating results as theoretically Pareto optimal in a planning process, we use the powerful multi-objective optimization models as tools to more efficiently and effectively move out of the inferior decision space. The use of this framework will help CSU

  9. Health promotion as multi-professional and multi-disciplinary work

    Directory of Open Access Journals (Sweden)

    Chrisanthy Sotiriadou

    2010-01-01

    Full Text Available Background: A health promoter is the name given to all those experts who are intended to prevent disease andill health and to increase well-being at the community level. That seems to be a very good and useful idea ingeneral, but can it be achieved by individuals alone?Objective: Review to what extend team work and the concept of team development are a pre-requisite foreffective health promotion. That is the central objective of this article and the answer will be explored through ananalysis of the international literature.Discussion: The first part will set out to define the notions of both health promotion and health promotionspecialists, in order to provide a framework for the multi-professional and multi-disciplinary nature of healthpromotion. The second part will try to establish the meaning of collaboration for health promotion, starting withdefinitions of the concepts: group, team and teamwork. The benefits of collaborative work in health promotionwill be discussed alongside the common barriers that can arise during the process.Conclusions: The article will conclude by proposing the characteristics of a successful team-working healthpromotion group.

  10. Multi-annual energy plan. Part relating to the Ponant islands. The Energy transition for green growth

    International Nuclear Information System (INIS)

    2016-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for the inhabited and non-interconnected Ponant Islands (Ouessant, Molene, Sein). It establishes the priority actions for all energy sources with respect to demand control, supply diversification, supply security, supply and demand management, renewal of production means. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  11. En Route Descent Advisor Multi-Sector Planning Using Active and Provisional Controller Plans

    Science.gov (United States)

    Vivona, Robert; Green, Steven

    2003-01-01

    As decision support tools are developed to support controllers in complex air traffic control environments, new approaches to maintaining situation awareness and managing traffic planning must be developed to handle the ever-increasing amounts of alerting and advisory data. Within high-density metering and other environments where flight path changes are the rule, not the exception, and where interactions between these changes are required, current trial planning approaches are limited by potential increases in workload. The Enroute Descent Advisor (EDA) is a set of decision support tool capabilities for managing high-density en route traffic subject to metering restrictions. The EDA system s novel approach builds aircraft plans from combinations of user intent data and builds controller plans from combinations of aircraft plans to effectively maintain situation awareness during traffic planning. By maintaining both active (current) and provisional (proposed) controller plans, EDA supports controllers in coordinated traffic planning both within and between sectors. Ultimately, EDA s multi-sector planning approach will facilitate a transition from current sector-oriented operations to a new trajectory-oriented paradigm, enabling new levels of efficiency and collaboration in air traffic control.

  12. [Some psychological problems in family planning work].

    Science.gov (United States)

    Chen, J

    1983-11-29

    Psychology has significance in family planning work, because it may promote the scientific nature of family planning work and thus increase its effectiveness. Since people have some common aspects in their psychological process, family planning workers should master some common rules of the people's psychological process in order to understand psychological trends and possible behavior. Through this method, family planning workers may find how to adjust to problems they may encounter in their daily work, such as the worries about a single child being too lonely, spoiled, and hard to handle for the parents, the traditional belief that more children represent good fortune, and more male children may provide security for one's old age. Traditionally, the Chinese people believed that only male children can carry on the family line and that more children will provide a larger labor force, which is beneficial to a family's financial situation. In family planning work, all such incorrect ways of thinking should be corrected and revised. Studies of children's psychology should also be developed so that children may develop a healthy mentality. All these are crucial to the success of family planning work and the promotion of population quality.

  13. Transition projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Cartmell, D.B.

    1994-09-01

    This reference contains information about the deactivation of the Purex Process Plant located on the Hanford Reservation. This document consists of a tabular schedule of events covering the next three years.

  14. Transition projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1. Volume 4

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1994-09-01

    This reference contains information about the deactivation of the Purex Process Plant located on the Hanford Reservation. This document consists of a tabular schedule of events covering the next three years

  15. How many plans are needed in an IMRT multi-objective plan database?

    International Nuclear Information System (INIS)

    Craft, David; Bortfeld, Thomas

    2008-01-01

    In multi-objective radiotherapy planning, we are interested in Pareto surfaces of dimensions 2 up to about 10 (for head and neck cases, the number of structures to trade off can be this large). A key question that has not been answered yet is: how many plans does it take to sufficiently represent a high-dimensional Pareto surface? In this paper, we present a method to answer this question, and we show that the number of points needed is modest: 75 plans always controlled the error to within 5%, and in all cases but one, N + 1 plans, where N is the number of objectives, was enough for <15% error. We introduce objective correlation matrices and principal component analysis (PCA) of the beamlet solutions as two methods to understand this. PCA reveals that the feasible beamlet solutions of a Pareto database lie in a narrow, small dimensional subregion of the full beamlet space, which helps explain why the number of plans needed to characterize the database is small

  16. SeaSketch: Implementation of a Decision-Support Platform for a Channel Islands National Marine Sanctuary Multi-sector Working Group

    Science.gov (United States)

    Goldberg, G.; McClintock, W.

    2016-12-01

    Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem

  17. Increasing resiliency to natural hazards - A strategic plan for the Multi-Hazards Demonstration Project in Southern California

    Science.gov (United States)

    Jones, Lucy; Bernknopf, Richard; Cannon, Susan; Cox, Dale A.; Gaydos, Len; Keeley, Jon; Kohler, Monica; Lee, Homa; Ponti, Daniel; Ross, Stephanie L.; Schwarzbach, Steven; Shulters, Michael; Ward, A. Wesley; Wein, Anne

    2007-01-01

    The U.S. Geological Survey (USGS) is initiating a new project designed to improve resiliency to natural hazards in southern California through the application of science to community decision making and emergency response. The Multi-Hazards Demonstration Project will assist the region’s communities to reduce their risk from natural hazards by directing new and existing research towards the community’s needs, improving monitoring technology, producing innovative products, and improving dissemination of the results. The natural hazards to be investigated in this project include coastal erosion, earthquakes, floods, landslides, tsunamis, and wildfires.Americans are more at risk from natural hazards now than at any other time in our Nation’s history. Southern California, in particular, has one of the Nation’s highest potentials for extreme catastrophic losses due to natural hazards, with estimates of expected losses exceeding $3 billion per year. These losses can only be reduced through the decisions of the southern California community itself. To be effective, these decisions must be guided by the best information about hazards, risk, and the cost-effectiveness of mitigation technologies. The USGS will work with collaborators to set the direction of the research and to create multi-hazard risk frameworks where communities can apply the results of scientific research to their decision-making processes. Partners include state, county, city, and public-lands government agencies, public and private utilities, companies with a significant impact and presence in southern California, academic researchers, the Federal Emergency Management Agency (FEMA), National Oceanic and Atmospheric Administration (NOAA), and local emergency response agencies.Prior to the writing of this strategic plan document, three strategic planning workshops were held in February and March 2006 at the USGS office in Pasadena to explore potential relationships. The goal of these planning

  18. Scalable and practical multi-objective distribution network expansion planning

    NARCIS (Netherlands)

    Luong, N.H.; Grond, M.O.W.; Poutré, La J.A.; Bosman, P.A.N.

    2015-01-01

    We formulate the distribution network expansion planning (DNEP) problem as a multi-objective optimization (MOO) problem with different objectives that distribution network operators (DNOs) would typically like to consider during decision making processes for expanding their networks. Objectives are

  19. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  20. Enhanced radiological work planning; TOPICAL

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  1. Development of an Out-Year Planning Document for MPC and A Work at the RMTC as a Base for Future Center Activity and Sustainability

    International Nuclear Information System (INIS)

    Ryazanov, Boris; Goryunov, Victor; Shapsha, V.; Crawford, Cary E.

    2007-01-01

    The Material Protection Control and Accounting (MPC and A) Program has been working for several years with the Russian Methodological and Training Center (RMTC) to implement training and methodological support programs related to Material Control and Accounting (MC and A). This cooperation will continue throughout the next few years, as courses are updated/maintained, methodological support provided, and an MC and A equipment-testing center established. As this work continues, it is important that not only are the near-term, easily identifiable activities conducted, but also the long-range vision is considered and appropriate plans are prepared to ensure that the work is being addressed in the proper priority. In addition, it is also important that the RMTC understands and identifies the necessary resources to complete the work.

  2. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Leus, R.; Wullink, Gerhard; Hans, Elias W.; Herroelen, W.

    2004-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. A positioning framework is proposed to distinguish between different types of project-driven organisations, which is meant to aid project management in the choice between the

  3. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Hans, Elias W.; Herroelen, W.; Wullink, Gerhard; Leus, R.

    2007-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. Based on these viewpoints we propose a positioning framework to distinguish between different types of project-driven organisations. This framework is meant to aid project

  4. Migration plans and hours of work in Malaysia.

    Science.gov (United States)

    Gillin, E D; Sumner, D A

    1985-01-01

    "This article describes characteristics of prospective migrants in the Malaysian Family Life Survey and investigates how planning to move affects hours of work. [The authors] use ideas about intertemporal substitution...to discuss the response to temporary and permanent wage expectations on the part of potential migrants. [An] econometric section presents reduced-form estimates for wage rates and planned migration equations and two-stage least squares estimates for hours of work. Men currently planning a move were found to work fewer hours. Those originally planning only a temporary stay at their current location work more hours." excerpt

  5. Multi area and multistage expansion-planning of electricity supply with sustainable energy development criteria: a multi objective model

    Energy Technology Data Exchange (ETDEWEB)

    Unsihuay-Vila, Clodomiro; Marangon-Lima, J.W.; Souza, A.C Zambroni de [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], emails: clodomirounsihuayvila @gmail.com, marangon@unifei.edu.br, zambroni@unifei.edu.br; Perez-Arriaga, I.J. [Universidad Pontificia Comillas, Madrid (Spain)], email: ipa@mit.edu

    2010-07-01

    A novel multi objective, multi area and multistage model to long-term expansion-planning of integrated generation and transmission corridors incorporating sustainable energy developing is presented in this paper. The proposed MESEDES model is a multi-regional multi-objective and 'bottom-up' energy model which considers the electricity generation/transmission value-chain, i.e., power generation alternatives including renewable, nuclear and traditional thermal generation along with transmission corridors. The model decides the optimal location and timing of the electricity generation/transmission abroad the multistage planning horizon. The MESEDES model considers three objectives belonging to sustainable energy development criteria such as: a) the minimization of investments and operation costs of : power generation, transmission corridors, energy efficiency (demand side management (DSM) programs) considering CO2 capture technologies; b) minimization of Life Cycle Greenhouse Gas Emissions (LC GHG); c) maximization of the diversification of electricity generation mix. The proposed model consider aspects of the carbon abatement policy under the CDM - Clean Development Mechanism or European Union Greenhouse Gas Emission Trading Scheme. A case study is used to illustrate the proposed framework. (author)

  6. Controls on Arctic sea ice from first-year and multi-year survival rates

    Energy Technology Data Exchange (ETDEWEB)

    Hunke, Jes [Los Alamos National Laboratory

    2009-01-01

    The recent decrease in Arctic sea ice cover has transpired with a significant loss of multi year ice. The transition to an Arctic that is populated by thinner first year sea ice has important implications for future trends in area and volume. Here we develop a reduced model for Arctic sea ice with which we investigate how the survivability of first year and multi year ice control the mean state, variability, and trends in ice area and volume.

  7. Environmental restoration and waste management five year plan, fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ''bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information at the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  8. Multi-disciplinary work [~ tværfagligligt samarbejde] in Denmark

    DEFF Research Database (Denmark)

    Miðskarð, Jóhannes

    2008-01-01

    This article reviews literature on Multi-Disciplinary Work (MDW) for children and young people in need of special support, as defined by the Danish Social Services Act. The focus is on frontline workers’ everyday encounters with each other. The author reviews all significant Danish publications...... the last 30 years, this literature review reveals a lack of research publications. Even though the literature review advocates that the quality of existing Danish research literature is varying, it also demonstrates that there are several good sources which can be used when writing theoretically about MDW...

  9. Cooperative path planning for multi-USV based on improved artificial bee colony algorithm

    Science.gov (United States)

    Cao, Lu; Chen, Qiwei

    2018-03-01

    Due to the complex constraints, more uncertain factors and critical real-time demand of path planning for multiple unmanned surface vehicle (multi-USV), an improved artificial bee colony (I-ABC) algorithm were proposed to solve the model of cooperative path planning for multi-USV. First the Voronoi diagram of battle field space is conceived to generate the optimal area of USVs paths. Then the chaotic searching algorithm is used to initialize the collection of paths, which is regard as foods of the ABC algorithm. With the limited data, the initial collection can search the optimal area of paths perfectly. Finally simulations of the multi-USV path planning under various threats have been carried out. Simulation results verify that the I-ABC algorithm can improve the diversity of nectar source and the convergence rate of algorithm. It can increase the adaptability of dynamic battlefield and unexpected threats for USV.

  10. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  11. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  12. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    Energy Technology Data Exchange (ETDEWEB)

    Young, Ralph [Paducah Citizens Advisory Board (United States)

    2013-07-01

    One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site

  13. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal years 2012

    International Nuclear Information System (INIS)

    Asamori, Koichi; Niwa, Masakazu; Hanamuro, Takahiro; Yamada, Kunimi; Kusano, Tomohiro; Makuuchi, Ayumu; Takatori, Ryoichi; Saito-Kokubu, Yoko; Ishimaru, Tsuneari; Umeda, Koji

    2012-07-01

    The concept of geological disposal of HLW in Japan is based on a multi-barrier system which combines a stable geological environment with a robust barrier system. Potential geological host formations and their surroundings are chosen, in particular, for their long-term stability, taking into account the fact that Japan is located in a tectonically active zone. This report is a plan of research and development (R and D) on geosphere stability for long-term isolation of HLW in JAEA, in fiscal year 2012. The objectives and contents in fiscal year 2012 are described in detail based on the outline of 5 years plan (fiscal years 2010-2014). In addition, the planned framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  14. Multi-day activity scheduling reactions to planned activities and future events in a dynamic agent-based model of activity-travel behavior

    NARCIS (Netherlands)

    Nijland, E.W.L.; Arentze, T.A.; Timmermans, H.J.P.

    2009-01-01

    Modeling multi-day planning has received scarce attention today in activity-based transport demand modeling. Elaborating and combining previous work on event-driven activity generation, the aim of this paper is to develop and illustrate an extension of a need-based model of activity generation that

  15. MINERVA: A multi-modality plug-in-based radiation therapy treatment planning system

    International Nuclear Information System (INIS)

    Wemple, C. A.; Wessol, D. E.; Nigg, D. W.; Cogliati, J. J.; Milvich, M.; Fredrickson, C. M.; Perkins, M.; Harkin, G. J.; Hartmann-Siantar, C. L.; Lehmann, J.; Flickinger, T.; Pletcher, D.; Yuan, A.; DeNardo, G. L.

    2005-01-01

    Researchers at the INEEL, MSU, LLNL and UCD have undertaken development of MINERVA, a patient-centric, multi-modal, radiation treatment planning system, which can be used for planning and analysing several radiotherapy modalities, either singly or combined, using common treatment planning tools. It employs an integrated, lightweight plug-in architecture to accommodate multi-modal treatment planning using standard interface components. The design also facilitates the future integration of improved planning technologies. The code is being developed with the Java programming language for inter-operability. The MINERVA design includes the image processing, model definition and data analysis modules with a central module to coordinate communication and data transfer. Dose calculation is performed by source and transport plug-in modules, which communicate either directly through the database or through MINERVA's openly published, extensible markup language (XML)-based application programmer's interface (API). All internal data are managed by a database management system and can be exported to other applications or new installations through the API data formats. A full computation path has been established for molecular-targeted radiotherapy treatment planning, with additional treatment modalities presently under development. (authors)

  16. The 10,000 Year Plan

    International Nuclear Information System (INIS)

    L.Srisaro

    2006-01-01

    Pallavi Pharkya thinks a lot about the future. Pharkya, a Ph.D. candidate in materials science and engineering, works in the area of corrosion science, predicting how materials will perform over extended periods of time. Her particular focus is a nickel-chromium-molybdenum alloy called C-22, a highly corrosion-resistant metal. Pharkya's aim is to help determine whether containers made from C-22 can be used to store high-energy nuclear waste--for 10,000 years and longer. Pharkya's work is part of a plan by the U.S. Department of Energy to consolidate the country's nuclear waste in a single proposed repository. The proposed repository is in Yucca Mountain located in a remote Nevada desert. Currently about 70,000 metric tons of spent nuclear fuel and high-level radioactive waste are divided between approximately 100 sites around the country. The undertaking, Pharkya emphasizes, is massive. To study just the corrosion aspects of the packaging, Case is collaborating with eight other universities, five national labs and Atomic Energy of Canada Limited. Even with so many players, the study will likely take several years to complete. Heading the entire group is Joe Payer, a professor of materials science and engineering at Case and Pharkya's mentor. ''I came here to have the opportunity to work with Dr. Payer, an expert in corrosion, but I didn't know specifically what I would be working on'', Pharkya recalls. ''I was pretty thrilled when I learned about the vastness of the project--my research would be just a small part of this huge topic--and the impact of the research we would be doing''

  17. Participatory Planning, Monitoring and Evaluation of Multi-Stakeholder Platforms in Integrated Landscape Initiatives.

    Science.gov (United States)

    Kusters, Koen; Buck, Louise; de Graaf, Maartje; Minang, Peter; van Oosten, Cora; Zagt, Roderick

    2017-03-21

    Integrated landscape initiatives typically aim to strengthen landscape governance by developing and facilitating multi-stakeholder platforms. These are institutional coordination mechanisms that enable discussions, negotiations, and joint planning between stakeholders from various sectors in a given landscape. Multi-stakeholder platforms tend to involve complex processes with diverse actors, whose objectives and focus may be subjected to periodic re-evaluation, revision or reform. In this article we propose a participatory method to aid planning, monitoring, and evaluation of such platforms, and we report on experiences from piloting the method in Ghana and Indonesia. The method is comprised of three components. The first can be used to look ahead, identifying priorities for future multi-stakeholder collaboration in the landscape. It is based on the identification of four aspirations that are common across multi-stakeholder platforms in integrated landscape initiatives. The second can be used to look inward. It focuses on the processes within an existing multi-stakeholder platform in order to identify areas for possible improvement. The third can be used to look back, identifying the main outcomes of an existing platform and comparing them to the original objectives. The three components can be implemented together or separately. They can be used to inform planning and adaptive management of the platform, as well as to demonstrate performance and inform the design of new interventions.

  18. Training Planning and Working Memory in Third Graders

    Science.gov (United States)

    Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano

    2013-01-01

    Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…

  19. Multi-actor involvement for integrating ecosystem services in strategic environmental assessment of spatial plans

    International Nuclear Information System (INIS)

    Rozas-Vásquez, Daniel; Fürst, Christine; Geneletti, Davide; Muñoz, Francisco

    2017-01-01

    Integrating an ecosystem services (ES) approach into Strategic Environmental Assessment (SEA) of spatial plans potentially enhances the consideration of the value of nature in decision making and policy processes. However, there is increasing concern about the institutional context and a lack of a common understanding of SEA and ecosystem services for adopting them as an integrated framework. This paper addresses this concern by analysing the current understanding and network relations in a multi-actor arrangement as a first step towards a successful integration of ES in SEA and spatial planning. Our analysis focuses on a case study in Chile, where we administered a questionnaire survey to some of the main actors involved in the spatial planning process. The questionnaire focused on issues such as network relations among actors and on conceptual understanding, perceptions and challenges for integrating ES in SEA and spatial planning, knowledge on methodological approaches, and the connections and gaps in the science-policy interface. Our findings suggest that a common understanding of SEA and especially of ES in a context of multiple actors is still at an initial stage in Chile. Additionally, the lack of institutional guidelines and methodological support is considered the main challenge for integration. We conclude that preconditions exist in Chile for integrating ES in SEA for spatial planning, but they strongly depend on appropriate governance schemes that promote a close science-policy interaction, as well as collaborative work and learning. - Highlights: • Linking ecosystem services in SEA is an effective framework for sustainability. • Multi-actor understanding and networks in ecosystem services and SEA were analyzed. • Understanding of SEA and especially of ES is still in an initial stage in Chile. • A lack of institutional guidelines is one of the key challenges for this link.

  20. Multi-actor involvement for integrating ecosystem services in strategic environmental assessment of spatial plans

    Energy Technology Data Exchange (ETDEWEB)

    Rozas-Vásquez, Daniel, E-mail: danielrozas@gmail.com [Center for Development Research, Dept. Ecology and Natural Resources Management, University of Bonn, Walter Flex Str. 3, 53113 Bonn (Germany); Laboratorio de Planificación Territorial, Universidad Católica de Temuco, Rudecindo ortega, 02950 Temuco (Chile); Fürst, Christine [Martin Luther University Halle-Wittenberg, Dept. Natural Sciences III, Institute for Geosciences and Geography, Von Seckendorff-Platz 4, 06120 Halle-Saale (Germany); Geneletti, Davide [University of Trento, Department of Civil, Environmental and Mechanical Engineering, via Mesiano, 77, Trento 38123 (Italy); Muñoz, Francisco [Laboratorio de Planificación Territorial, Universidad Católica de Temuco, Rudecindo ortega, 02950 Temuco (Chile)

    2017-01-15

    Integrating an ecosystem services (ES) approach into Strategic Environmental Assessment (SEA) of spatial plans potentially enhances the consideration of the value of nature in decision making and policy processes. However, there is increasing concern about the institutional context and a lack of a common understanding of SEA and ecosystem services for adopting them as an integrated framework. This paper addresses this concern by analysing the current understanding and network relations in a multi-actor arrangement as a first step towards a successful integration of ES in SEA and spatial planning. Our analysis focuses on a case study in Chile, where we administered a questionnaire survey to some of the main actors involved in the spatial planning process. The questionnaire focused on issues such as network relations among actors and on conceptual understanding, perceptions and challenges for integrating ES in SEA and spatial planning, knowledge on methodological approaches, and the connections and gaps in the science-policy interface. Our findings suggest that a common understanding of SEA and especially of ES in a context of multiple actors is still at an initial stage in Chile. Additionally, the lack of institutional guidelines and methodological support is considered the main challenge for integration. We conclude that preconditions exist in Chile for integrating ES in SEA for spatial planning, but they strongly depend on appropriate governance schemes that promote a close science-policy interaction, as well as collaborative work and learning. - Highlights: • Linking ecosystem services in SEA is an effective framework for sustainability. • Multi-actor understanding and networks in ecosystem services and SEA were analyzed. • Understanding of SEA and especially of ES is still in an initial stage in Chile. • A lack of institutional guidelines is one of the key challenges for this link.

  1. Multi-criteria analysis and systemic planning: Towards a tetra-logical approach to planning and assessment

    DEFF Research Database (Denmark)

    Leleur, Steen

    This paper presents systemic planning (SP) with emphasis on multi-criteria decision analysis (MCDA). Specifically, SP is presented as a “tetra-logical” methodology approach with MCDA as one out of four major method orientations. The Danish-Swedish Øresund Fixed Link is used as application example...

  2. Multi-annual energy plan for Reunion Island. Adopted by the plenary assembly of the Regional Council of Reunion

    International Nuclear Information System (INIS)

    2015-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Reunion Island (Indian Ocean). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  3. Study on hybrid multi-objective optimization algorithm for inverse treatment planning of radiation therapy

    International Nuclear Information System (INIS)

    Li Guoli; Song Gang; Wu Yican

    2007-01-01

    Inverse treatment planning for radiation therapy is a multi-objective optimization process. The hybrid multi-objective optimization algorithm is studied by combining the simulated annealing(SA) and genetic algorithm(GA). Test functions are used to analyze the efficiency of algorithms. The hybrid multi-objective optimization SA algorithm, which displacement is based on the evolutionary strategy of GA: crossover and mutation, is implemented in inverse planning of external beam radiation therapy by using two kinds of objective functions, namely the average dose distribution based and the hybrid dose-volume constraints based objective functions. The test calculations demonstrate that excellent converge speed can be achieved. (authors)

  4. Trade-off bounds for the Pareto surface approximation in multi-criteria IMRT planning

    International Nuclear Information System (INIS)

    Serna, J I; Monz, M; Kuefer, K H; Thieke, C

    2009-01-01

    One approach to multi-criteria IMRT planning is to automatically calculate a data set of Pareto-optimal plans for a given planning problem in a first phase, and then interactively explore the solution space and decide on the clinically best treatment plan in a second phase. The challenge of computing the plan data set is to ensure that all clinically meaningful plans are covered and that as many clinically irrelevant plans as possible are excluded to keep computation times within reasonable limits. In this work, we focus on the approximation of the clinically relevant part of the Pareto surface, the process that constitutes the first phase. It is possible that two plans on the Pareto surface have a small, clinically insignificant difference in one criterion and a significant difference in another criterion. For such cases, only the plan that is clinically clearly superior should be included into the data set. To achieve this during the Pareto surface approximation, we propose to introduce bounds that restrict the relative quality between plans, the so-called trade-off bounds. We show how to integrate these trade-off bounds into the approximation scheme and study their effects. The proposed scheme is applied to two artificial cases and one clinical case of a paraspinal tumor. For all cases, the quality of the Pareto surface approximation is measured with respect to the number of computed plans, and the range of values occurring in the approximation for different criteria is compared. Through enforcing trade-off bounds, the scheme disregards clinically irrelevant plans during the approximation. Thereby, the number of plans necessary to achieve a good approximation quality can be significantly reduced. Thus, trade-off bounds are an effective tool to focus the planning and to reduce computation time.

  5. Trade-off bounds for the Pareto surface approximation in multi-criteria IMRT planning.

    Science.gov (United States)

    Serna, J I; Monz, M; Küfer, K H; Thieke, C

    2009-10-21

    One approach to multi-criteria IMRT planning is to automatically calculate a data set of Pareto-optimal plans for a given planning problem in a first phase, and then interactively explore the solution space and decide on the clinically best treatment plan in a second phase. The challenge of computing the plan data set is to ensure that all clinically meaningful plans are covered and that as many clinically irrelevant plans as possible are excluded to keep computation times within reasonable limits. In this work, we focus on the approximation of the clinically relevant part of the Pareto surface, the process that constitutes the first phase. It is possible that two plans on the Pareto surface have a small, clinically insignificant difference in one criterion and a significant difference in another criterion. For such cases, only the plan that is clinically clearly superior should be included into the data set. To achieve this during the Pareto surface approximation, we propose to introduce bounds that restrict the relative quality between plans, the so-called trade-off bounds. We show how to integrate these trade-off bounds into the approximation scheme and study their effects. The proposed scheme is applied to two artificial cases and one clinical case of a paraspinal tumor. For all cases, the quality of the Pareto surface approximation is measured with respect to the number of computed plans, and the range of values occurring in the approximation for different criteria is compared. Through enforcing trade-off bounds, the scheme disregards clinically irrelevant plans during the approximation. Thereby, the number of plans necessary to achieve a good approximation quality can be significantly reduced. Thus, trade-off bounds are an effective tool to focus the planning and to reduce computation time.

  6. Building energy simulation using multi-years and typical meteorological years in different climates

    International Nuclear Information System (INIS)

    Yang Liu; Lam, Joseph C.; Liu Jiaping; Tsang, C.L.

    2008-01-01

    Detailed hourly energy simulation was conducted for office buildings in the five major climate zones - severe cold, cold, hot summer and cold winter, mild and hot summer and warm winter - in China using multi-year (1971-2000) weather databases as well as typical meteorological years (TMY). The primary aim was to compare the energy simulation results from the TMY with those from individual years and their long term means. A total of 154 simulation runs were performed. Building heating and cooling loads, their components and energy use for heating, ventilation and air-conditioning were analysed. Predicted monthly load and energy consumption profiles from the TMY tended to follow the long term mean quite closely. Mean bias errors ranged from -4.3% in Guangzhou to 0% in Beijing and root-mean-square errors from 3% in Harbin to 5.4% in Guangzhou. These percentages were not always the smallest compared with the 30 individual years, however, they are at the lower end of the percentage error ranges. This paper presents the work and its findings

  7. Special initiatives FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 5.0

    International Nuclear Information System (INIS)

    Jekel, R.A.

    1994-09-01

    The Special Initiatives mission supports programmatic requests for service to DOE offices, other organizations and agencies. These requests can include the following: Supporting priority DOE initiatives; Researching special programs; Studying locating new activities at the Hanford Site; Producing specialty materials; Providing consulting support to other sites; Managing a broad spectrum of US and international test programs

  8. Peer Pressure in Multi-Dimensional Work Tasks

    OpenAIRE

    Felix Ebeling; Gerlinde Fellner; Johannes Wahlig

    2012-01-01

    We study the influence of peer pressure in multi-dimensional work tasks theoretically and in a controlled laboratory experiment. Thereby, workers face peer pressure in only one work dimension. We find that effort provision increases in the dimension where peer pressure is introduced. However, not all of this increase translates into a productivity gain, since the effect is partly offset by a decrease of effort in the work dimension without peer pressure. Furthermore, this tradeoff is stronger...

  9. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    Science.gov (United States)

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout

  10. CASI Work Plan: Calendar Year 2013

    Science.gov (United States)

    2013-02-15

    PNNL Pacific Northwest National Laboratory POC Point of Contact PR Puerto Rico PROSPECT Proponent Sponsored Engineer Corps Training PV...Infrastructure Demonstration for Energy Relia- bility and Security (SPIDERS) Program. The 3-year JCTD SPIDERS program will deploy microgrid technology to Joint...Base Pearl-Hickam, HI, Fort Carson, CO, and Camp Smith, HI. The deployed microgrids will ensure critical missions have a reliable and secure electric

  11. Bi-objective optimization for multi-modal transportation routing planning problem based on Pareto optimality

    Directory of Open Access Journals (Sweden)

    Yan Sun

    2015-09-01

    Full Text Available Purpose: The purpose of study is to solve the multi-modal transportation routing planning problem that aims to select an optimal route to move a consignment of goods from its origin to its destination through the multi-modal transportation network. And the optimization is from two viewpoints including cost and time. Design/methodology/approach: In this study, a bi-objective mixed integer linear programming model is proposed to optimize the multi-modal transportation routing planning problem. Minimizing the total transportation cost and the total transportation time are set as the optimization objectives of the model. In order to balance the benefit between the two objectives, Pareto optimality is utilized to solve the model by gaining its Pareto frontier. The Pareto frontier of the model can provide the multi-modal transportation operator (MTO and customers with better decision support and it is gained by the normalized normal constraint method. Then, an experimental case study is designed to verify the feasibility of the model and Pareto optimality by using the mathematical programming software Lingo. Finally, the sensitivity analysis of the demand and supply in the multi-modal transportation organization is performed based on the designed case. Findings: The calculation results indicate that the proposed model and Pareto optimality have good performance in dealing with the bi-objective optimization. The sensitivity analysis also shows the influence of the variation of the demand and supply on the multi-modal transportation organization clearly. Therefore, this method can be further promoted to the practice. Originality/value: A bi-objective mixed integer linear programming model is proposed to optimize the multi-modal transportation routing planning problem. The Pareto frontier based sensitivity analysis of the demand and supply in the multi-modal transportation organization is performed based on the designed case.

  12. Options for Parallelizing a Planning and Scheduling Algorithm

    Science.gov (United States)

    Clement, Bradley J.; Estlin, Tara A.; Bornstein, Benjamin D.

    2011-01-01

    Space missions have a growing interest in putting multi-core processors onboard spacecraft. For many missions processing power significantly slows operations. We investigate how continual planning and scheduling algorithms can exploit multi-core processing and outline different potential design decisions for a parallelized planning architecture. This organization of choices and challenges helps us with an initial design for parallelizing the CASPER planning system for a mesh multi-core processor. This work extends that presented at another workshop with some preliminary results.

  13. WIPP Facility Work Plan for Solid Waste Management Units

    International Nuclear Information System (INIS)

    2000-01-01

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A

  14. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  15. An improved fast and elitist multi-objective genetic algorithm-ANSGA-II for multi-objective optimization of inverse radiotherapy treatment planning

    International Nuclear Information System (INIS)

    Cao Ruifen; Li Guoli; Song Gang; Zhao Pan; Lin Hui; Wu Aidong; Huang Chenyu; Wu Yican

    2007-01-01

    Objective: To provide a fast and effective multi-objective optimization algorithm for inverse radiotherapy treatment planning system. Methods: Non-dominated Sorting Genetic Algorithm-NSGA-II is a representative of multi-objective evolutionary optimization algorithms and excels the others. The paper produces ANSGA-II that makes use of advantage of NSGA-II, and uses adaptive crossover and mutation to improve its flexibility; according the character of inverse radiotherapy treatment planning, the paper uses the pre-known knowledge to generate individuals of every generation in the course of optimization, which enhances the convergent speed and improves efficiency. Results: The example of optimizing average dose of a sheet of CT, including PTV, OAR, NT, proves the algorithm could find satisfied solutions in several minutes. Conclusions: The algorithm could provide clinic inverse radiotherapy treatment planning system with selection of optimization algorithms. (authors)

  16. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  17. Multi-day activity scheduling reactions to planned activities and future events in a dynamic model of activity-travel behavior

    Science.gov (United States)

    Nijland, Linda; Arentze, Theo; Timmermans, Harry

    2014-01-01

    Modeling multi-day planning has received scarce attention in activity-based transport demand modeling so far. However, new dynamic activity-based approaches are being developed at the current moment. The frequency and inflexibility of planned activities and events in activity schedules of individuals indicate the importance of incorporating those pre-planned activities in the new generation of dynamic travel demand models. Elaborating and combining previous work on event-driven activity generation, the aim of this paper is to develop and illustrate an extension of a need-based model of activity generation that takes into account possible influences of pre-planned activities and events. This paper describes the theory and shows the results of simulations of the extension. The simulation was conducted for six different activities, and the parameter values used were consistent with an earlier estimation study. The results show that the model works well and that the influences of the parameters are consistent, logical, and have clear interpretations. These findings offer further evidence of face and construct validity to the suggested modeling approach.

  18. Work ability as prognostic risk marker of disability pension: single-item work ability score versus multi-item work ability index.

    Science.gov (United States)

    Roelen, Corné A M; van Rhenen, Willem; Groothoff, Johan W; van der Klink, Jac J L; Twisk, Jos W R; Heymans, Martijn W

    2014-07-01

    Work ability predicts future disability pension (DP). A single-item work ability score (WAS) is emerging as a measure for work ability. This study compared single-item WAS with the multi-item work ability index (WAI) in its ability to identify workers at risk of DP. This prospective cohort study comprised 11 537 male construction workers, who completed the WAI at baseline and reported DP after a mean 2.3 years of follow-up. WAS and WAI were calibrated for DP risk predictions with the Hosmer-Lemeshow (H-L) test and their ability to discriminate between high- and low-risk construction workers was investigated with the area under the receiver operating characteristic curve (AUC). At follow-up, 336 (3%) construction workers reported DP. Both WAS [odds ratio (OR) 0.72, 95% confidence interval (95% CI) 0.66-0.78] and WAI (OR 0.57, 95% CI 0.52-0.63) scores were associated with DP at follow-up. The WAS showed miscalibration (H-L model χ (�)=10.60; df=3; P=0.01) and poorly discriminated between high- and low-risk construction workers (AUC 0.67, 95% CI 0.64-0.70). In contrast, calibration (H-L model χ �=8.20; df=8; P=0.41) and discrimination (AUC 0.78, 95% CI 0.75-0.80) were both adequate for the WAI. Although associated with the risk of future DP, the single-item WAS poorly identified male construction workers at risk of DP. We recommend using the multi-item WAI to screen for risk of DP in occupational health practice.

  19. Stability, structure and scale: improvements in multi-modal vessel extraction for SEEG trajectory planning.

    Science.gov (United States)

    Zuluaga, Maria A; Rodionov, Roman; Nowell, Mark; Achhala, Sufyan; Zombori, Gergely; Mendelson, Alex F; Cardoso, M Jorge; Miserocchi, Anna; McEvoy, Andrew W; Duncan, John S; Ourselin, Sébastien

    2015-08-01

    Brain vessels are among the most critical landmarks that need to be assessed for mitigating surgical risks in stereo-electroencephalography (SEEG) implantation. Intracranial haemorrhage is the most common complication associated with implantation, carrying significantly associated morbidity. SEEG planning is done pre-operatively to identify avascular trajectories for the electrodes. In current practice, neurosurgeons have no assistance in the planning of electrode trajectories. There is great interest in developing computer-assisted planning systems that can optimise the safety profile of electrode trajectories, maximising the distance to critical structures. This paper presents a method that integrates the concepts of scale, neighbourhood structure and feature stability with the aim of improving robustness and accuracy of vessel extraction within a SEEG planning system. The developed method accounts for scale and vicinity of a voxel by formulating the problem within a multi-scale tensor voting framework. Feature stability is achieved through a similarity measure that evaluates the multi-modal consistency in vesselness responses. The proposed measurement allows the combination of multiple images modalities into a single image that is used within the planning system to visualise critical vessels. Twelve paired data sets from two image modalities available within the planning system were used for evaluation. The mean Dice similarity coefficient was 0.89 ± 0.04, representing a statistically significantly improvement when compared to a semi-automated single human rater, single-modality segmentation protocol used in clinical practice (0.80 ± 0.03). Multi-modal vessel extraction is superior to semi-automated single-modality segmentation, indicating the possibility of safer SEEG planning, with reduced patient morbidity.

  20. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  1. Multi-product dynamic advertisement planning in a segmented market

    Directory of Open Access Journals (Sweden)

    Aggarwal Sugandha

    2017-01-01

    Full Text Available In this paper, a dynamic multi-objective linear integer programming model is proposed to optimally distribute a firm’s advertising budget among multiple products and media in a segmented market. To make the media plan responsive to the changes in the market, the distribution is carried out dynamically by dividing the planning horizon into smaller periods. The model incorporates the effect of the previous period advertising reach on the current period (taken through retention factor, and it also considers cross-product effect of simultaneously advertising different products. An application of the model is presented for an insurance firm that markets five different products, using goal programming approach.

  2. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  3. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  4. Tank waste remediation system fiscal year 1998 multi-year work plan WBS 1.1

    Energy Technology Data Exchange (ETDEWEB)

    Lenseigne, D. L.

    1997-09-15

    The TWRS Project Mission is to manage and immobilize for disposal the Hanford Site radioactive tank waste and cesium (Cs)/strontium (Sr) capsules in a safe, environmentally sound, and cost-effective manner. The scope includes all activities needed to (1) resolve safety issues; (2) operate, maintain, and upgrade the tank farms and supporting infrastructure; (3) characterize, retrieve, pretreat, and immobilize the waste for disposal and tank farm closure; and (4) use waste minimization and evaporation to manage tank waste volumes to ensure that the tank capacities of existing DSTs are not exceeded. The TWRS Project is responsible for closure of assigned operable units and D&D of TWRS facilities.

  5. Worklife expectancy in a cohort of Danish employees aged 55-65 years - comparing a multi-state Cox proportional hazard approach with conventional multi-state life tables.

    Science.gov (United States)

    Pedersen, Jacob; Bjorner, Jakob Bue

    2017-11-15

    Work life expectancy (WLE) expresses the expected time a person will remain in the labor market until he or she retires. This paper compares a life table approach to estimating WLE to an approach based on multi-state proportional hazards models. The two methods are used to estimate WLE in Danish members and non-members of an early retirement pensioning (ERP) scheme according to levels of health. In 2008, data on self-rated health (SRH) was collected from 5212 employees 55-65 years of age. Data on previous and subsequent long-term sickness absence, unemployment, returning to work, and disability pension was collected from national registers. WLE was estimated from multi-state life tables and through multi-state models. Results from the multi-state model approach agreed with the life table approach but provided narrower confidence intervals for small groups. The shortest WLE was seen for employees with poor SRH and ERP membership while the longest WLE was seen for those with good SRH and no ERP membership. Employees aged 55-56 years with poor SRH but no ERP membership had shorter WLE than employees with good SRH and ERP membership. Relative WLE reversed for the two groups after age 57. At age 55, employees with poor SRH could be expected to spend approximately 12 months on long-term sick leave and 9-10 months unemployed before they retired - regardless of ERP membership. ERP members with poor SRH could be expected to spend 4.6 years working, while non-members could be expected to spend 7.1 years working. WLE estimated through multi-state models provided an effective way to summarize complex data on labor market affiliation. WLE differed noticeably between members and non-members of the ERP scheme. It has been hypothesized that while ERP membership would prompt some employees to retire earlier than they would have done otherwise, this effect would be partly offset by reduced time spent on long-term sick leave or unemployment. Our data showed no indication of

  6. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...... indicates that a measurable reduction of repetitive work has been achieved, while recognizing the the new management strategies focusing on human resources development have also played an important role. These results are used to suggest that - under certain conditions - a combination of state regulation...... and industrial relation agreements can be used to regulate other working environment problems....

  7. SU-E-T-628: A Cloud Computing Based Multi-Objective Optimization Method for Inverse Treatment Planning.

    Science.gov (United States)

    Na, Y; Suh, T; Xing, L

    2012-06-01

    Multi-objective (MO) plan optimization entails generation of an enormous number of IMRT or VMAT plans constituting the Pareto surface, which presents a computationally challenging task. The purpose of this work is to overcome the hurdle by developing an efficient MO method using emerging cloud computing platform. As a backbone of cloud computing for optimizing inverse treatment planning, Amazon Elastic Compute Cloud with a master node (17.1 GB memory, 2 virtual cores, 420 GB instance storage, 64-bit platform) is used. The master node is able to scale seamlessly a number of working group instances, called workers, based on the user-defined setting account for MO functions in clinical setting. Each worker solved the objective function with an efficient sparse decomposition method. The workers are automatically terminated if there are finished tasks. The optimized plans are archived to the master node to generate the Pareto solution set. Three clinical cases have been planned using the developed MO IMRT and VMAT planning tools to demonstrate the advantages of the proposed method. The target dose coverage and critical structure sparing of plans are comparable obtained using the cloud computing platform are identical to that obtained using desktop PC (Intel Xeon® CPU 2.33GHz, 8GB memory). It is found that the MO planning speeds up the processing of obtaining the Pareto set substantially for both types of plans. The speedup scales approximately linearly with the number of nodes used for computing. With the use of N nodes, the computational time is reduced by the fitting model, 0.2+2.3/N, with r̂2>0.99, on average of the cases making real-time MO planning possible. A cloud computing infrastructure is developed for MO optimization. The algorithm substantially improves the speed of inverse plan optimization. The platform is valuable for both MO planning and future off- or on-line adaptive re-planning. © 2012 American Association of Physicists in Medicine.

  8. A multi-objective optimization model for energy-efficiency building envelope retrofitting plan with rooftop PV system installation and maintenance

    International Nuclear Information System (INIS)

    Fan, Yuling; Xia, Xiaohua

    2017-01-01

    Highlights: • A multi-objective optimization model for building envelope retrofit is presented. • Facility performance degradation and maintenance is built into the model. • A rooftop PV system is introduced to produce electricity. • Economic factors including net present value and payback period are considered. - Abstract: Retrofitting existing buildings with energy-efficient facilities is an effective method to improve their energy efficiency, especially for old buildings. A multi-objective optimization model for building envelope retrofitting is presented. Envelope components including windows, external walls and roofs are considered to be retrofitted. Installation of a rooftop solar panel system is also taken into consideration in this study. Rooftop solar panels are modeled with their degradation and a maintenance scheme is studied for sustainability of energy and its long-term effect on the retrofitting plan. The purpose is to make the best use of financial investment to maximize energy savings and economic benefits. In particular, net present value, the payback period and energy savings are taken as the main performance indicators of the retrofitting plan. The multi-objective optimization problem is formulated as a non-linear integer programming problem and solved by a weighted sum method. Results of applying the designed retrofitting plan to a 50-year-old building consisting of 66 apartments demonstrated the effectiveness of the proposed model.

  9. Long working hours and cancer risk: a multi-cohort study.

    Science.gov (United States)

    Heikkila, Katriina; Nyberg, Solja T; Madsen, Ida E H; de Vroome, Ernest; Alfredsson, Lars; Bjorner, Jacob J; Borritz, Marianne; Burr, Hermann; Erbel, Raimund; Ferrie, Jane E; Fransson, Eleonor I; Geuskens, Goedele A; Hooftman, Wendela E; Houtman, Irene L; Jöckel, Karl-Heinz; Knutsson, Anders; Koskenvuo, Markku; Lunau, Thorsten; Nielsen, Martin L; Nordin, Maria; Oksanen, Tuula; Pejtersen, Jan H; Pentti, Jaana; Shipley, Martin J; Steptoe, Andrew; Suominen, Sakari B; Theorell, Töres; Vahtera, Jussi; Westerholm, Peter J M; Westerlund, Hugo; Dragano, Nico; Rugulies, Reiner; Kawachi, Ichiro; Batty, G David; Singh-Manoux, Archana; Virtanen, Marianna; Kivimäki, Mika

    2016-03-29

    Working longer than the maximum recommended hours is associated with an increased risk of cardiovascular disease, but the relationship of excess working hours with incident cancer is unclear. This multi-cohort study examined the association between working hours and cancer risk in 116 462 men and women who were free of cancer at baseline. Incident cancers were ascertained from national cancer, hospitalisation and death registers; weekly working hours were self-reported. During median follow-up of 10.8 years, 4371 participants developed cancer (n colorectal cancer: 393; n lung cancer: 247; n breast cancer: 833; and n prostate cancer: 534). We found no clear evidence for an association between working hours and the overall cancer risk. Working hours were also unrelated the risk of incident colorectal, lung or prostate cancers. Working ⩾55 h per week was associated with 1.60-fold (95% confidence interval 1.12-2.29) increase in female breast cancer risk independently of age, socioeconomic position, shift- and night-time work and lifestyle factors, but this observation may have been influenced by residual confounding from parity. Our findings suggest that working long hours is unrelated to the overall cancer risk or the risk of lung, colorectal or prostate cancers. The observed association with breast cancer would warrant further research.

  10. Work ability as prognostic risk marker of disability pension : Single-item work ability score versus multi-item work ability index

    NARCIS (Netherlands)

    Roelen, C.A.M.; Rhenen, van W.; Groothoff, J.W.; Klink, van der J.J.L.; Twisk, W.R.; Heymans, M.W.

    2014-01-01

    Work ability predicts future disability pension (DP). A single-item work ability score (WAS) is emerging as a measure for work ability. This study compared single-item WAS with the multi-item work ability index (WAI) in its ability to identify workers at risk of DP.

  11. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal years 2011

    International Nuclear Information System (INIS)

    Yasue, Ken-ichi; Asamori, Koichi; Kusano, Tomohiro; Saito-Kokubu, Yoko; Tanikawa, Shin-ichi; Niwa, Masakazu; Hanamuro, Takahiro; Yamasaki, Seiko; Yamada, Kunimi; Ishimaru, Tsuneari; Umeda, Koji

    2011-07-01

    The concept of geological disposal of HLW in Japan is based on a multi-barrier system which combines a stable geological environment with a robust barrier system. Potential geological host formations and their surroundings are chosen, in particular, for their long-term stability, taking into account the fact that Japan is located in a tectonically active zone. This report is a plan of research and development (R and D) on geosphere stability for long-term isolation of HLW in JAEA, in fiscal year 2011. The objectives and contents in fiscal year 2011 are described in detail based on the outline of 5 years plan (fiscal years 2010-2014). In addition, the planed framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  12. Work-Family Planning Attitudes among Emerging Adults

    Science.gov (United States)

    Basuil, Dynah A.; Casper, Wendy J.

    2012-01-01

    Using social learning theory as a framework, we explore two sets of antecedents to work and family role planning attitudes among emerging adults: their work-family balance self-efficacy and their perceptions of their parents' work-to-family conflict. A total of 187 college students completed a questionnaire concerning their work-family balance…

  13. Work ability as prognostic risk marker of disability pension: single-item work ability score versus multi-item work ability index

    NARCIS (Netherlands)

    Roelen, C.A.M.; van Rhenen, W.; Groothoff, J.W.; van der Klink, J.J.L.; Twisk, J.W.R.; Heymans, M.W.

    2014-01-01

    Objectives Work ability predicts future disability pension (DP). A single-item work ability score (WAS) is emerging as a measure for work ability. This study compared single-item WAS with the multi-item work ability index (WAI) in its ability to identify workers at risk of DP. Methods This

  14. Work ability as prognostic risk marker of disability pension : single-item work ability score versus multi-item work ability index

    NARCIS (Netherlands)

    Roelen, Corne A. M.; van Rhenen, Willem; Groothoff, Johan W.; van der Klink, Jac J. L.; Twisk, Jos W. R.; Heymans, Martijn W.

    Objectives Work ability predicts future disability pension (DP). A single-item work ability score (WAS) is emerging as a measure for work ability. This study compared single-item WAS with the multi-item work ability index (WAI) in its ability to identify workers at risk of DP. Methods This

  15. Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    International Nuclear Information System (INIS)

    2010-01-01

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone No.3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  16. Novel and conventional working fluid mixtures for solar Rankine cycles: Performance assessment and multi-criteria selection

    International Nuclear Information System (INIS)

    Mavrou, Paschalia; Papadopoulos, Athanasios I.; Stijepovic, Mirko Z.; Seferlis, Panos; Linke, Patrick; Voutetakis, Spyros

    2015-01-01

    This work investigates the performance of working fluid mixtures for use in solar ORC (Organic Rankine Cycle systems) with heat storage employing FPC (Flat Plate Collectors). Several mixtures are considered including conventional choices often utilized in ORC as well as novel mixtures previously designed using advanced computer aided molecular design methods (Papadopoulos et al., 2013). The impact of heat source variability on the ORC performance is assessed for different working fluid mixtures. Solar radiation is represented in detail through actual, hourly averaged data for an entire year. A multi-criteria mixture selection methodology unveils important trade-offs among several important system operating parameters and efficiently highlights optimum operating ranges. Such parameters include the ORC thermal efficiency, the net generated power, the volume ratio across the turbine, the mass flow rate of the ORC working fluid, the evaporator temperature glide, the temperature drop in the storage tank, the ORC total yearly operating duration, the required collector aperture area to generate 1 kW of power and the irreversibility. A mixture of neopentane – 2-fluoromethoxy-2-methylpropane at 70% neopentane is found to be the most efficient in all the considered criteria simultaneously. - Highlights: • Investigation of novel and conventional working fluid mixtures for solar ORCs. • Systematic, multi-criteria assessment methodology for mixture selection. • Simultaneous consideration of multiple important mixture performance criteria. • Effects of year-round solar variability in a solar ORC with heat storage tank

  17. Work characteristics predict the development of multi-site musculoskeletal pain.

    Science.gov (United States)

    Oakman, Jodi; de Wind, Astrid; van den Heuvel, Swenne G; van der Beek, Allard J

    2017-10-01

    Musculoskeletal pain in more than one body region is common and a barrier to sustaining employment. We aimed to examine whether work characteristics predict the development of multi-site pain (MSP), and to determine differences in work-related predictors between age groups. This study is based on 5136 employees from the Study on Transitions in Employment, Ability and Motivation (STREAM) who reported no MSP at baseline. Measures included physical, emotional, mental, and psychological job demands, social support and autonomy. Predictors of MSP were studied by logistic regression analyses. Univariate and multivariate analyses with age stratification (45-49, 50-54, 55-59, and 60-64 years) were done to explore differences between age groups. All work characteristics with the exception of autonomy were predictive of the development of MSP, with odds ratios varying from 1.21 (95% CI 1.04-1.40) for mental job demands to 1.63 (95% CI 1.43-1.86) for physical job demands. No clear pattern of age-related differences in the predictors of MSP emerged, with the exception of social support, which was predictive of MSP developing in all age groups except for the age group 60-64 years. Adverse physical and psychosocial work characteristics are associated with MSP. Organisations need to comprehensively assess work environments to ensure that all relevant workplace hazards, physical and psychosocial, are identified and then controlled for across all age groups.

  18. Worklife expectancy in a cohort of Danish employees aged 55–65 years - comparing a multi-state Cox proportional hazard approach with conventional multi-state life tables

    Directory of Open Access Journals (Sweden)

    Jacob Pedersen

    2017-11-01

    Full Text Available Abstract Background Work life expectancy (WLE expresses the expected time a person will remain in the labor market until he or she retires. This paper compares a life table approach to estimating WLE to an approach based on multi-state proportional hazards models. The two methods are used to estimate WLE in Danish members and non-members of an early retirement pensioning (ERP scheme according to levels of health. Methods In 2008, data on self-rated health (SRH was collected from 5212 employees 55–65 years of age. Data on previous and subsequent long-term sickness absence, unemployment, returning to work, and disability pension was collected from national registers. WLE was estimated from multi-state life tables and through multi-state models. Results Results from the multi-state model approach agreed with the life table approach but provided narrower confidence intervals for small groups. The shortest WLE was seen for employees with poor SRH and ERP membership while the longest WLE was seen for those with good SRH and no ERP membership. Employees aged 55–56 years with poor SRH but no ERP membership had shorter WLE than employees with good SRH and ERP membership. Relative WLE reversed for the two groups after age 57. At age 55, employees with poor SRH could be expected to spend approximately 12 months on long-term sick leave and 9–10 months unemployed before they retired – regardless of ERP membership. ERP members with poor SRH could be expected to spend 4.6 years working, while non-members could be expected to spend 7.1 years working. Conclusion WLE estimated through multi-state models provided an effective way to summarize complex data on labor market affiliation. WLE differed noticeably between members and non-members of the ERP scheme. It has been hypothesized that while ERP membership would prompt some employees to retire earlier than they would have done otherwise, this effect would be partly offset by reduced time spent on

  19. Long working hours and cancer risk: a multi-cohort study

    NARCIS (Netherlands)

    Heikkila, K.; Nyberg, S.T.; Madsen, I.E.; Vroome, E. de; Alfredsson, L.; Bjorner, J.B.; Borritz, M.; Burr, H.; Erbel, R.; Ferrie, J.E.; Fransson, E.; Geuskens, G.A.; Hooftman, W.E.; Houtman, I.L.; Jöckel, K.H.; Knutsson, A.; Koskenvuo, M.; Lunau, T.; Nielsen, M.L.; Nordin, M.; Oksanen, T.; Pejtersen, J.H.; Pentti, J.; Shipley, M.J.; Steptoe, A.; Suominen, S.B.; Theorell, T.; Vahtera, J.; Westerholm, P.J.M.; Westerlund, H.; Dragano, N.; Rugulies, R.; Kawachi, I.; Batty, G.D.; Singh-Manoux, A.; Virtanen, M.; Kivimäki, M.

    2016-01-01

    Background: Working longer than the maximum recommended hours is associated with an increased risk of cardiovascular disease, but the relationship of excess working hours with incident cancer is unclear. Methods: This multi-cohort study examined the association between working hours and cancer risk

  20. Planning adaptation for food and farming: lessons from 40 year's research

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Hannah; Chambwera, Muyeye; Murray, Laurel

    2012-05-15

    Local farmers and pastoralists in poor countries have long coped with droughts, floods and variable rainfall patterns. This first-hand experience is invaluable for those working on climate change adaptation policies, but how do we access it? The International Institute for Environment and Development (IIED) has 40 years' experience working alongside vulnerable communities to help inform regional, national and global policies. Our research has shown that measures to increase climate change resilience must view food, energy, water and waste management systems as interconnected and mutually dependent. This holistic approach must also be applied to economic analysis on adaptation planning. Similarly, it is vital to use traditional knowledge and management skills, which can further support adaptation planning. Taking these lessons into account, we can then address the emerging policy challenges that we face.

  1. Multi-Objective Planning of Multi-Type Distributed Generation Considering Timing Characteristics and Environmental Benefits

    Directory of Open Access Journals (Sweden)

    Yajing Gao

    2014-09-01

    Full Text Available This paper presents a novel approach to multi-type distributed generation (DG planning based on the analysis of investment and income brought by grid-connected DG. Firstly, the timing characteristics of loads and DG outputs, as well as the environmental benefits of DG are analyzed. Then, on the basis of the classification of daily load sequences, the typical daily load sequence and the typical daily output sequence of DG per unit capacity can be computed. The proposed planning model takes the location, capacity and types of DG into account as optimization variables. An improved adaptive genetic algorithm is proposed to solve the model. Case studies have been carried out on the IEEE 14-node distribution system to verify the feasibility and effectiveness of the proposed method and model.

  2. Center Planning and Development: Multi-User Spaceport Initiatives

    Science.gov (United States)

    Kennedy, Christopher John

    2015-01-01

    The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any

  3. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  4. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  5. Technical Work Plan for: Fracture and Lithophysal Studies

    International Nuclear Information System (INIS)

    2006-01-01

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models

  6. Technical Work Plan for: Fracture and Lithophysal Studies

    Energy Technology Data Exchange (ETDEWEB)

    n

    2006-09-11

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models.

  7. Hanford year 2000 Business Continuity Plan

    International Nuclear Information System (INIS)

    VORNEY, S.V.

    1999-01-01

    The goal of Department of Energy Richland Operations (DOE-RL) Year 2000 (Y2K) effort is to ensure that the Hanford site successfully continues its mission as we approach and enter the 21th century. The Y2K Business Continuity Planning process provides a structured approach to identify Y2K risks to the site and to mitigate these risks through Y2K Contingency Planning, ''Zero-Day'' Transition Planning and Emergency Preparedness. This document defines the responsibilities, processes and plans for Hanford's Y2K Business Continuity. It identifies proposed business continuity drills, tentative schedule and milestones

  8. The International Space Life Sciences Strategic Planning Working Group

    Science.gov (United States)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  9. US Strategic Plan: two years on

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    In the two years since it issued its Strategic Plan for Building New Nuclear Power Plants, the US nuclear power industry says significant progress has been achieved. The plan's major points call for completing the engineering for advanced reactor designs over the next five years; identifying suitable sites for new nuclear plants; achieving stable regulatory conditions so investors can be assured of earning a fair return on financing for new plants; improving the performance of existing nuclear plants; resolving the waste problems; and improving public acceptance of nuclear power. (author)

  10. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  11. Analysis of a yearly multi-round, multi-period, multi-product transmission rights auction

    International Nuclear Information System (INIS)

    Ziogos, N.P.; Bakirtzis, A.G.

    2008-01-01

    A yearly multi-round, multi-period, multi-product transmission rights (TR) auction issuing both point-to-point Financial Transmission Rights (FTRs) and Flow-Gate Rights (FGRs) is studied in this paper. In each round the TR market participants (buyers or sellers) submit their bid or offer prices based on past energy market performance. A Locational Marginal Pricing (LMP) based energy market is assumed. The TR market participants' bid or offer prices reflect their expectation of the average annual LMP differences between withdrawal and injections points for FTRs and of the transmission link capacity prices for FGRs. The TR auction is performed in four rounds; in each round 25% of the entire system capability is awarded. TRs that are awarded in one round are modeled as fixed injections in subsequent rounds. Market participants that have acquired TRs in one round can sell them in subsequent rounds. A market participant can submit bids or offers for on-peak, off-peak or 24-h TRs. A three-area, nine-bus test system with six TR market participants is used for the analysis of the TR auction. (author)

  12. Flexible Multi-Objective Transmission Expansion Planning with Adjustable Risk Aversion

    Directory of Open Access Journals (Sweden)

    Jing Qiu

    2017-07-01

    Full Text Available This paper presents a multi-objective transmission expansion planning (TEP framework. Rather than using the conventional deterministic reliability criterion, a risk component based on the probabilistic reliability criterion is incorporated into the TEP objectives. This risk component can capture the stochastic nature of power systems, such as load and wind power output variations, component availability, and incentive-based demand response (IBDR costs. Specifically, the formulation of risk value after risk aversion is explicitly given, and it aims to provide network planners with the flexibility to conduct risk analysis. Thus, a final expansion plan can be selected according to individual risk preferences. Moreover, the economic value of IBDR is modeled and integrated into the cost objective. In addition, a relatively new multi-objective evolutionary algorithm called the MOEA/D is introduced and employed to find Pareto optimal solutions, and tradeoffs between overall cost and risk are provided. The proposed approach is numerically verified on the Garver’s six-bus, IEEE 24-bus RTS and Polish 2383-bus systems. Case study results demonstrate that the proposed approach can effectively reduce cost and hedge risk in relation to increasing wind power integration.

  13. PFP requirements development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Requirements Development Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. Future revisions to this document will be included as attachments (e.g., results of the PFP Requirements Analysis attributable to this approach). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Future updates may be made to this document by PFP management and final approval of the content will be accomplished in a Baseline Change Request as it impacts the Multi-Year Work Plan, or baseline information managed in the Hanford Site Systems Engineering Baseline

  14. Applying Planning Algorithms to Argue in Cooperative Work

    Science.gov (United States)

    Monteserin, Ariel; Schiaffino, Silvia; Amandi, Analía

    Negotiation is typically utilized in cooperative work scenarios for solving conflicts. Anticipating possible arguments in this negotiation step represents a key factor since we can take decisions about our participation in the cooperation process. In this context, we present a novel application of planning algorithms for argument generation, where the actions of a plan represent the arguments that a person might use during the argumentation process. In this way, we can plan how to persuade the other participants in cooperative work for reaching an expected agreement in terms of our interests. This approach allows us to take advantages since we can test anticipated argumentative solutions in advance.

  15. Dose exposure work planning using DMU kinematics tools

    International Nuclear Information System (INIS)

    Rosli Darmawan

    2010-01-01

    The study on the possibility of using DMU Kinematics module in CAE tools for dose exposure work planning was carried out. A case scenario was created using 3D CAD software and transferred to DMU Kinematics module in CAE software. A work plan was created using DMU Kinematics tools and animated to simulate a real time scenario. Data on the phantom position against the radioactive source was collected by activating positioning sensors in the module. The data was used to estimate dose rate exposure for the phantom. The results can be used to plan the safest and optimum procedures in carrying out the radiation related task. (author)

  16. Application of multi-criteria decision making to sustainable energy planning - a review

    Energy Technology Data Exchange (ETDEWEB)

    Pohekar, S.D.; Ramachandram, M. [Birla Inst. of Technology and Science, Pilani (India)

    2004-08-01

    Multi-Criteria Decision Making (MCDM) techniques are gaining popularity in sustainable energy management. The techniques provide solutions to the problems involving conflicting and multiple objectives. Several methods based on weighted averages, priority setting, outranking, fuzzy principles and their combinations are employed for energy planning decisions. A review of more than 90 published papers is presented here to analyze the applicability of various methods discussed. A classification on application areas and the year of application is presented to highlight the trends. It is observed that Analytical Hierarchy Process is the most popular technique followed by outranking techniques PROMETHEE and ELECTRE. Validation of results with multiple methods, development of interactive decision support systems and application of fuzzy methods to tackle uncertainties in the data is observed in the published literature. (author)

  17. Collaboration on DIII-D Five Year Plan

    International Nuclear Information System (INIS)

    Allen, S

    2003-01-01

    with a single channel, the system has grown to 40 channels with three separate systems. We have continually developed new calibration techniques, with a goal of accuracy in the magnetic field pitch angle measurements of ∼0.1 degree. Measurements of the radial electric field E r have also been achieved. In the next five year period, GA plans on rotating one of the neutral beams so that it injects opposite to the sense of the plasma current (counter-injection). This enables two orthogonal MSE views of the neutral beam so that J(r) and E r can be obtained directly. In addition, the new views can be optimized so that increased spatial resolution will be obtained. Our plan is to install these new systems when the neutral beam is reoriented, and continue to provide high-resolution, ''state of the art'' current profile measurements for the DIII-D AT program. In the divertor physics area, our goal is the development of a model of the scrapeoff layer (SOL) and divertor plasmas which is benchmarked with data. We have identified the need for measurements of SOL flow and ion temperature. Working with GA, we are proposing a new edge Charge Exchange Recombination (CER) diagnostic. The understanding of SOL flow is important for understanding the tritium inventory problem in ITER. In addition, using plasma flow to ''entrain'' impurities in the divertor region (enabling a low density radiative divertor) is the current AT divertor heat flux control scenario. We are also augmenting our edge modeling capabilities with a coupled UEDGE (fluid code) with the BOUT (edge turbulence) code. Further work, funded through LLNL theory, is planned to develop a kinetic treatment of the edge. All of these efforts contribute to the understanding of the edge pedestal in the tokamak, an important AT and ITER topic. A secondary goal is the understanding of Edge Localized Modes (ELMs), which are also important in the ITER design, as the repetitive bursts of heat flux can cause increased erosion and damage

  18. Ten-Year Network Development Plan - 2015 edition, executive summary

    International Nuclear Information System (INIS)

    2016-01-01

    Complying with the European and French laws, each year, RTE prepares and publicizes a Ten-Year Network Development Plan (NDP) to meet the expectations of its stakeholders and customers. The NDP lists the network development projects that RTE plans to complete and commission over a 3-year period and presents the main power transmission infrastructure work envisaged for the next Ten-years. Beyond, it outlines the possible network adaptation needs for a variety of energy transition scenarios. Over the next 10 years, the network investments will make it possible to: - Meet the goals of the Regional Climate Air Energy Plans, - Create 4 GW of extra offshore wind generation integration capacity and 10 GW of additional interconnection capacity, 2/3 more than the current capacity, - Enable the development of economically and demographically dynamic areas, with safe and high-standard electricity supply. In the coming decade, RTE plans: - 1,200 km of new underground and sub-sea DC links, along with their associated converter stations; - 600 km of existing equipment upgrades or new overhead 400 kV AC circuits substituting existing power lines. - and, at the same time, nearly 900 km of underground lines and just over 400 km of overhead 225 kV AC lines should be built. 400 projects are listed in this NDP: - 21% of the operations are on overhead lines (for 3/4 new lines or upgrade and for 1/4 dismantling of existing assets) - 27% concern new underground lines; - 52% on substation adaptations (about 20 new RTE substations and 100 new customer substations connected). Globally, nearly 80% of the network is developed underground or sub-sea. This edition of the Network Development plan is further enriched. In particular, it explains more thoroughly the link between the integration of renewable energy and the entailed development of the transmission network. It also provides a focus on smart grids. This edition relies on mid and long term scenarios describing the evolution of the

  19. Modification of a three-dimensional treatment planning system for the use of multi-leaf collimators in conformation radiotherapy

    International Nuclear Information System (INIS)

    Boesecke, R.; Becker, G.; Alandt, K.; Pastyr, O.; Doll, J.; Schlegel, W.; Lorenz, W.J.

    1991-01-01

    The multi-leaf collimator of the DKFZ is designed as a low cost add-on device for conventional linear accelerators for radiotherapy. The technical specification of the computer controlled collimator is briefly described . A major limitation in the use of the wide capabilities of multi-leaf collimators in the clinic is still an appropriate treatment planning system. This paper describes treatment planning and dose calculation techniques for multi-leaf collimators and shows examples where the capabilities of the collimators are used extensively. (author). 18 refs.; 8 figs.; 2 tabs

  20. Urban Conservation Policies and Plans for a World Heritage Site Case: Antique Pergamon City and its Multi-Layered Cultural Landscape

    Science.gov (United States)

    Tunçer, Mehmet

    2017-10-01

    Izmir’s Pergamon (Bergama) Antique City and Its Multi-Layered Cultural Landscape entered the UNESCO World Heritage List with the participation of 21 countries in the 38th World Heritage Committee Meeting held in Doha, Qatar’s capital in between 15 - 25 June 2014. Bergama became the 999th WORLD HERITAGE. Bergama, which has been in operation since 2010, has entered the list as a Multi-layered Cultural Landscape Area. The main purpose of this paper will explain and summarize of urban and archaeological conservation efforts for Pergamon since 1992 to 2014. In the paper also aimed to give the conservation policies of public administrations which mainly central /Ministry of Culture and Tourism, Ministry of Environment/ and local /Bergama Municipality, Gen. Directorate of Vakiflar. Turkey is one of the 10 original member states to establish UNESCO. 9 cities in Turkey are included in the UNESCO List of World Heritage Sites. Further, 23 sites have been nominated and are included in the tentative list. The activities aimed to include the district of Bergama in the UNESCO World Heritage List are ongoing in the years 2009-2014. All the efforts have been made carry this unique antique city to the UNESCO Heritage List at 2014. As an Urban Conservation Planner, I had a change of preparing the FIRST Conservation Aimed Plans and urban designs for Urban and Archaeological Sites of Pergamon together with my team, in the years between 1992-94. We prepared conservation aimed plans for all of the areas of Acropolis, Middle City and Ottoman period urban conservation areas. Urban and archaeological sites of Pergamon the ancient city today, which is over two thousand years old, where scientists, archaeologists, architects, art historians, urban planners, sculptors and similar arts and culture, men talk about admiration, write about and write praises, face to face some deterioration and destruction. As a conservation planner working on Pergamon since 1992, I’ will concentrate the

  1. Hanford year 2000 Business Continuity Plan

    Energy Technology Data Exchange (ETDEWEB)

    ROGGENKAMP, S.L.

    1999-11-01

    The goal of Department of Energy Richland Operations (DOE-RL) Year 2000 (Y2K) effort is to ensure that the Hanford site successfully continues its mission as we approach and enter the 21th century. The Y2K Business Continuity Planning process provides a structured approach to identify Y2K risks to the site and to mitigate these risks through Y2K Contingency Planning, ''Zero-Day'' Transition Planning and Emergency Preparedness. This document defines the responsibilities, processes and plans for Hanford's Y2K Business Continuity. It identifies proposed business continuity drills, tentative schedule and milestones.

  2. A 20-Year multi-followup longitudinal study assessing whether antipsychotic medications contribute to work functioning in schizophrenia.

    Science.gov (United States)

    Harrow, Martin; Jobe, Thomas H; Faull, Robert N; Yang, Jie

    2017-10-01

    To assess the long-term effectiveness of antipsychotic medications in facilitating work functioning in patients with schizophrenia we conducted longitudinal multifollowup research on 139 initially psychotic patients. The 70 patients with schizophrenia and 69 initially psychotic mood disordered control patients were followed up 6 times over 20 years. We compared the influence on work functioning of patients with schizophrenia continuously prescribed antipsychotics with patients with schizophrenia not prescribed antipsychotics, using statistical controls for inter-subject differences. While antipsychotics reduce or eliminate flagrant psychosis for most patients with schizophrenia at acute hospitalizations, four years later and continually until the 20 year followups, patients with schizophrenia not prescribed antipsychotics had significantly better work functioning. The work performance of the patients who were continuously prescribed antipsychotics was at a low rate and did not improve over time. Multiple other factors also interfere with work functioning. The data suggest that some patients with schizophrenia not prescribed antipsychotics for prolonged periods can function relatively well. Multiple other factors are associated with poor post-hospital work performance. The longitudinal data raise questions about prolonged treatment of schizophrenia with antipsychotic medications. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. TWRS Systems Engineering Working Plan

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1994-01-01

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations

  4. An Integrated Method for Interval Multi-Objective Planning of a Water Resource System in the Eastern Part of Handan

    Directory of Open Access Journals (Sweden)

    Meiqin Suo

    2017-07-01

    Full Text Available In this study, an integrated solving method is proposed for interval multi-objective planning. The proposed method is based on fuzzy linear programming and an interactive two-step method. It cannot only provide objectively optimal values for multiple objectives at the same time, but also effectively offer a globally optimal interval solution. Meanwhile, the degree of satisfaction related to different objective functions would be obtained. Then, the integrated solving method for interval multi-objective planning is applied to a case study of planning multi-water resources joint scheduling under uncertainty in the eastern part of Handan, China. The solutions obtained are useful for decision makers in easing the contradiction between supply of multi-water resources and demand from different water users. Moreover, it can provide the optimal comprehensive benefits of economy, society, and the environment.

  5. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    1995-09-01

    The 1995 Hanford Mission Plan specifically addresses the tank waste issue and clarifies the link with other initiatives, such as improving management practices and the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE/RL-91-31). This document captures the results of decision making regarding the application of systems engineering at the Hanford Site, external involvement policy, and site end-state goals. Section 3.5 of the Hanford Mission Plan on Decisions and Directives provides an integrating discussion of the actions of the National Environmental Policy Act (NEPA), and DOE policy, guidance, and decisions associated with binding agreements such as the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Two significant components of the Hanford Mission Plan 1994 planning basis are (1) the decisions regarding the disposition of onsite material inventory, and the key programs and interfaces to accomplish this; and (2) the Program Interface Issues section, which identified issues that stretch across program boundaries

  6. Analytic hierarchy process-based approach for selecting a Pareto-optimal solution of a multi-objective, multi-site supply-chain planning problem

    Science.gov (United States)

    Ayadi, Omar; Felfel, Houssem; Masmoudi, Faouzi

    2017-07-01

    The current manufacturing environment has changed from traditional single-plant to multi-site supply chain where multiple plants are serving customer demands. In this article, a tactical multi-objective, multi-period, multi-product, multi-site supply-chain planning problem is proposed. A corresponding optimization model aiming to simultaneously minimize the total cost, maximize product quality and maximize the customer satisfaction demand level is developed. The proposed solution approach yields to a front of Pareto-optimal solutions that represents the trade-offs among the different objectives. Subsequently, the analytic hierarchy process method is applied to select the best Pareto-optimal solution according to the preferences of the decision maker. The robustness of the solutions and the proposed approach are discussed based on a sensitivity analysis and an application to a real case from the textile and apparel industry.

  7. Human Capital Management Plan Fiscal Years 2003- 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-03-09

    Western, like many other Federal agencies, will face significant and challenging human capital issues in the next decade. The Federal workforce is aging; baby boomers, with their valuable skills and experience, are drawing nearer to retirement and new employees joining the Federal workforce today have different career expectations from the generation that preceded them. The average age of Western’s workforce is approaching 48. Almost a third of the workforce is between 50 and 54 years and most will be eligible to retire in five years. Western has almost twice as many employees who are 55 and older as it has who are 35 and younger. As the workforce ages, the proportion of younger workers is shrinking. The U.S. Census Bureau says you can expect these developments for the next 20 years. The 45 to 65 year-old work group will grow by 54 percent but the 18 to 44 population will rise by only 4 percent. According to the Bureau of Labor Statistics workers age 25 to 44 will decline by 3 million, dropping from 51 percent of the labor force in 1998 to 44 percent in 2008. Western employees who will retire include highly skilled workers in fields such as information technology, engineering, and craft occupations. Deregulation of the electric utility industry and the establishment of regional transmission organizations and independent system operators are also demanding new and different skill mixes than those currently available in Western. Changes in workforce demographic, in the education and skills that will be required in the future, and an increasingly competitive job market, will require flexible and responsive human capital tools to attract and retain talented employees. These trends were the reason for a comprehensive review of Western’s human capital programs to determine its readiness for the future. In July 2001, a team of managers conducted a comprehensive assessment of Western’s human capital needs. The team used the assessment to draft a framework that

  8. Reflexive Planning as Design and Work

    DEFF Research Database (Denmark)

    Lissandrello, Enza; Grin, John

    2011-01-01

    in planning emerges as a new tool for generating critical knowledge and dialogue that can synthesise the perspectives of multiple actors in a common understanding, existing structural constraints and a collective imagination of alternative future possibilities. Such research highlights the potential......In recent years, planning theorists have advanced various interpretations of the notion of reflexivity, inspired by American pragmatism, complexity theory, hermeneutics, discursive and collaborative planning. Scholars agree that “reflexivity” has a strong temporal dimension: it not only aims...... to solve present planning problems, but to imagine and understand alternative trajectories for future action. This article explores the practical utility of reflexivity for planners, through a case study that focuses on a project to promote sustainable development in the Port of Amsterdam. Reflexivity...

  9. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites

  10. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  11. Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation

    Energy Technology Data Exchange (ETDEWEB)

    Tekiner, Hatice [Industrial Engineering, College of Engineering and Natural Sciences, Istanbul Sehir University, 2 Ahmet Bayman Rd, Istanbul (Turkey); Coit, David W. [Department of Industrial and Systems Engineering, Rutgers University, 96 Frelinghuysen Rd., Piscataway, NJ (United States); Felder, Frank A. [Edward J. Bloustein School of Planning and Public Policy, Rutgers University, Piscataway, NJ (United States)

    2010-12-15

    A new approach to the electricity generation expansion problem is proposed to minimize simultaneously multiple objectives, such as cost and air emissions, including CO{sub 2} and NO{sub x}, over a long term planning horizon. In this problem, system expansion decisions are made to select the type of power generation, such as coal, nuclear, wind, etc., where the new generation asset should be located, and at which time period expansion should take place. We are able to find a Pareto front for the multi-objective generation expansion planning problem that explicitly considers availability of the system components over the planning horizon and operational dispatching decisions. Monte-Carlo simulation is used to generate numerous scenarios based on the component availabilities and anticipated demand for energy. The problem is then formulated as a mixed integer linear program, and optimal solutions are found based on the simulated scenarios with a combined objective function considering the multiple problem objectives. The different objectives are combined using dimensionless weights and a Pareto front can be determined by varying these weights. The mathematical model is demonstrated on an example problem with interesting results indicating how expansion decisions vary depending on whether minimizing cost or minimizing greenhouse gas emissions or pollutants is given higher priority. (author)

  12. 23 CFR 1335.6 - Strategic plan.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Strategic plan. 1335.6 Section 1335.6 Highways NATIONAL... § 1335.6 Strategic plan. A strategic plan shall— (a) Be a multi-year plan that identifies and prioritizes... performance-based measures by which progress toward those goals will be determined; and (c) Be submitted to...

  13. Working plan BDG 91/92

    International Nuclear Information System (INIS)

    1991-09-01

    This report describes the investigative work planned at the potential location Bois de la Glaive, one of four possible locations for a waste disposal site for short-lived low and intermediate-level radioactive waste in Switzerland. This document replaces the 'plan d'execution BDG 89' dated October 1989, which lists the work which Nagra intends to carry out according to the preparatory work in accordance with Article 15 of the Bundesgesetz (Federal Law) regarding compulsory expropriation. This action was unfortunately necessary owing to the intense local opposition to the project. Owing to this opposition it was only possible to carry out field tests for the geophysical work and the plaster capped drill holes at the Bois de la Glaive as well as the hydrological cadastre. Thanks to a recommendation by the local authority and an amicable arrangement with the private owners at most of the observation points, it was possible to start periodic inspection measurements within the framework of the hydrogeological tests from March 1991. The aim of the tests described in this document is to obtain primary geological knowledge, as well as, where applicable, identify possible disqualifying criteria for the potential location at Bois de la Glaive. The different geological and hydrogeological tests are presented following an introduction which refers to the geological, historical and legal problems. It is intended to carry out these tests in 1991/92 possibly extending over into the first quarter 1993. Thus the necessary level of information should be achieved for this location. (author) figs., tabs., 14 refs

  14. U.S. Department of Energy clean cities five-year strategic plan.

    Energy Technology Data Exchange (ETDEWEB)

    Cambridge Concord Associates

    2011-02-15

    Clean Cities is a government-industry partnership sponsored by the U.S. Department of Energy's (DOE) Vehicle Technologies Program, which is part of the Office of Energy Efficiency and Renewable Energy. Working with its network of about 100 local coalitions and more than 6,500 stakeholders across the country, Clean Cities delivers on its mission to reduce petroleum consumption in on-road transportation. In its work to reduce petroleum use, Clean Cities focuses on a portfolio of technologies that includes electric drive, propane, natural gas, renewable natural gas/biomethane, ethanol/E85, biodiesel/B20 and higher-level blends, fuel economy, and idle reduction. Over the past 17 years, Clean Cities coalitions have displaced more than 2.4 billion gallons of petroleum; they are on track to displace 2.5 billion gallons of gasoline per year by 2020. This Clean Cities Strategic Plan lays out an aggressive five-year agenda to help DOE Clean Cities and its network of coalitions and stakeholders accelerate the deployment of alternative fuel and advanced technology vehicles, while also expanding the supporting infrastructure to reduce petroleum use. Today, Clean Cities has a far larger opportunity to make an impact than at any time in its history because of its unprecedented $300 million allocation for community-based deployment projects from the American Recovery and Reinvestment Act (ARRA) (see box below). Moreover, the Clean Cities annual budget has risen to $25 million for FY2010 and $35 million has been requested for FY2011. Designed as a living document, this strategic plan is grounded in the understanding that priorities will change annually as evolving technical, political, economic, business, and social considerations are woven into project decisions and funding allocations. The plan does not intend to lock Clean Cities into pathways that cannot change. Instead, with technology deployment at its core, the plan serves as a guide for decision-making at both the

  15. Evaluation plan for a cardiological multi-media workstation (I4C project)

    NARCIS (Netherlands)

    Hofstede, J.W. van der; Quak, A.B.; Ginneken, A.M. van; Macfarlane, P.W.; Watson, J.; Hendriks, P.R.; Zeelenberg, C.

    1997-01-01

    The goal of the I4C project (Integration and Communication for the Continuity of Cardiac Care) is to build a multi-media workstation for cardiac care and to assess its impact in the clinical setting. This paper describes the technical evaluation plan for the prototype.

  16. A Distributed Framework for Real Time Path Planning in Practical Multi-agent Systems

    KAUST Repository

    Abdelkader, Mohamed; Jaleel, Hassan; Shamma, Jeff S.

    2017-01-01

    We present a framework for distributed, energy efficient, and real time implementable algorithms for path planning in multi-agent systems. The proposed framework is presented in the context of a motivating example of capture the flag which

  17. Radiological Work Planning and Procedures

    CERN Document Server

    Kurtz, J E

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

  18. Work characteristics predict the development of multi-site musculoskeletal pain

    NARCIS (Netherlands)

    Oakman, J.; Wind, A. de; Heuvel, S.G. van den; Beek, A.J. van der

    2017-01-01

    Purpose. Musculoskeletal pain in more than one body region is common and a barrier to sustaining employment. We aimed to examine whether work characteristics predict the development of multi-site pain (MSP), and to determine differences in work-related predictors between age groups. Methods. This

  19. Planning of optimal work path for minimizing exposure dose during radiation work in radwaste storage

    International Nuclear Information System (INIS)

    Kim, Yoon Hyuk; Park, Won Man; Kim, Kyung Soo; Whang, Joo Ho

    2005-01-01

    Since the safety of nuclear power plant has been becoming a big social issue, the exposure dose of radiation for workers has been one of the important factors concerning the safety problem. The existing calculation methods of radiation dose used in the planning of radiation work assume that dose rate dose not depend on the location within a work space, thus the variation of exposure dose by different work path is not considered. In this study, a modified numerical method was presented to estimate the exposure dose during radiation work in radwaste storage considering the effects of the distance between a worker and sources. And a new numerical algorithm was suggested to search the optimal work path minimizing the exposure dose in pre-defined work space with given radiation sources. Finally, a virtual work simulation program was developed to visualize the exposure dose of radiation during radiation works in radwaste storage and provide the capability of simulation for work planning. As a numerical example, a test radiation work was simulated under given space and two radiation sources, and the suggested optimal work path was compared with three predefined work paths. The optimal work path obtained in the study could reduce the exposure dose for the given test work. Based on the results, the developed numerical method and simulation program could be useful tools in the planning of radiation work

  20. Design considerations for energy efficient, resilient, multi-layer networks

    DEFF Research Database (Denmark)

    Fagertun, Anna Manolova; Hansen, Line Pyndt; Ruepp, Sarah Renée

    2016-01-01

    measures. In this complex problem, considerations such as client traffic granularity, applied grooming policies and multi-layer resiliency add even more complexity. A commercially available network planning tool is used to investigate the interplay between different methods for resilient capacity planning......This work investigates different network design considerations with respect to energy-efficiency, under green-field resilient multi-layer network deployment. The problem of energy efficient, reliable multi-layer network design is known to result in different trade-offs between key performance....... Switching off low-utilized transport links has been investigated via a pro-active re-routing applied during the network planning. Our analysis shows that design factors such as the applied survivability strategy and the applied planning method have higher impact on the key performance indicators compared...

  1. Fiscal year 1987 program plan

    International Nuclear Information System (INIS)

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research ampersand Development (R ampersand D), the organizational interfaces and communication channels for R ampersand D and the establishment of procedures for planning, reporting, and budgeting of Operations and R ampersand D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years

  2. Planning of Autonomous Multi-agent Intersection

    Directory of Open Access Journals (Sweden)

    Viksnin Ilya I.

    2016-01-01

    Full Text Available In this paper, we propose a traffic management system with agents acting on behalf autonomous vehicle at the crossroads. Alternatively to existing solutions based on usage of semiautonomous control systems with the control unit, proposed in this paper algorithm apply the principles of decentralized multi-agent control. Agents during their collaboration generate intersection plan and determinate the optimal order of road intersection for a given criterion based on the exchange of information about them and their environment. The paper contains optimization criteria for possible routes selection and experiments that perform in order to estimate the proposed model. Experiment results show that this model can significantly reduce traffic density compared to the traditional traffic management systems. Moreover, the proposed algorithm efficiency increases with road traffic density. Furthermore, the availability of control unit in the system significantly reduces the negative impact of possible failures and hacker attacks.

  3. Landlord project multi-year program plan, fiscal year 1999, WBS 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Dallas, M.D.

    1998-09-22

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste, electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.

  4. The role of multi-detector CT angiography in surgical planning for congenital cervicothoracic kyphoscoliosis: a case report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hyun; Choi, Won Gyu; Shin, Ho Dong; Hwang, Byeong Wook; Lee, Sang Jin; Lee, Sang Ho [Busan Wooridul Spine Hospital, Busan (Korea, Republic of)

    2008-01-15

    Surgical correction of a cervicothoracic deformity is difficult with a potential risk of vascular injury. Comprehensive preoperative vascular evaluation is important for safe and successful surgery. The use of multi-detector computed tomography angiography (MDCTA) allows a combined display of vascular and osseous structures of the musculoskeletal system. However, no clinical reports have described the use of MDCTA for surgical planning of anterior cervicothoracic surgery in patients with vascular malformation. The case of a 7-year-old girl with congenital cervicothoracic kyphoscoliosis who underwent preoperative MDCTA evaluation and successful correction is presented in this report.

  5. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  6. Workplace Health Promotion and Mental Health: Three-Year Findings from Partnering Healthy@Work

    OpenAIRE

    Jarman, Lisa; Martin, Angela; Venn, Alison; Otahal, Petr; Blizzard, Leigh; Teale, Brook; Sanderson, Kristy

    2016-01-01

    This study aimed to investigate the association between mental health and comprehensive workplace health promotion (WHP) delivered to an entire state public service workforce (~28,000 employees) over a three-year period. Government departments in a state public service were supported to design and deliver a comprehensive, multi-component health promotion program, Healthy@Work, which targeted modifiable health risks including unhealthy lifestyles and stress. Repeated cross-sectional surveys co...

  7. Multi-year and reference year weather data for building energy labelling in north Italy climates

    NARCIS (Netherlands)

    Pernigotto, G.; Prada, A.; Costola, D.; Gasparella, A.; Hensen, J.L.M.

    2014-01-01

    Representative weather information is essential for a reliable building energy performance evaluation. Even if detailed energy analyses can be carried out considering the multi-year weather data, generally a single reference year is adopted. Thus, this artificial year has to correctly approximate

  8. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  9. The Five-Year Resume: A Career Planning Exercise

    Science.gov (United States)

    Laker, Dennis R.; Laker, Ruth

    2007-01-01

    For most college students, lack of career planning wastes time and resources and may result in years of "career drift." Lack of planning can also lead to deception once students begin seeking career-related employment. Faced with a competitive job market, some students inflate and exaggerate their resumes. The five-year resume exercise helps…

  10. A Distributed Framework for Real Time Path Planning in Practical Multi-agent Systems

    KAUST Repository

    Abdelkader, Mohamed

    2017-10-19

    We present a framework for distributed, energy efficient, and real time implementable algorithms for path planning in multi-agent systems. The proposed framework is presented in the context of a motivating example of capture the flag which is an adversarial game played between two teams of autonomous agents called defenders and attackers. We start with the centralized formulation of the problem as a linear program because of its computational efficiency. Then we present an approximation framework in which each agent solves a local version of the centralized linear program by communicating with its neighbors only. The premise in this work is that for practical multi-agent systems, real time implementability of distributed algorithms is more crucial then global optimality. Thus, instead of verifying the proposed framework by performing offline simulations in MATLAB, we run extensive simulations in a robotic simulator V-REP, which includes a detailed dynamic model of quadrotors. Moreover, to create a realistic scenario, we allow a human operator to control the attacker quadrotor through a joystick in a single attacker setup. These simulations authenticate that the proposed framework is real time implementable and results in a performance that is comparable with the global optimal solution under the considered scenarios.

  11. Satisfaction with work-life balance and the career and retirement plans of US oncologists.

    Science.gov (United States)

    Shanafelt, Tait D; Raymond, Marilyn; Kosty, Michael; Satele, Daniel; Horn, Leora; Pippen, John; Chu, Quyen; Chew, Helen; Clark, William Benton; Hanley, Amy E; Sloan, Jeff; Gradishar, William J

    2014-04-10

    To evaluate satisfaction with work-life balance (WLB) and career plans of US oncologists. The American Society of Clinical Oncology conducted a survey of US oncologists evaluating satisfaction with WLB and career plans between October 2012 and March 2013. The sample included equal numbers of men and women from all career stages. Of 2,998 oncologists contacted, 1,490 (49.7%) returned surveys. From 1,117 oncologists (37.3% of overall sample) completing full-length surveys, we evaluated satisfaction with WLB and career plans among the 1,058 who were not yet retired. The proportion of oncologists satisfied with WLB (n = 345; 33.4%) ranked lower than that reported for all other medical specialties in a recent national study. Regarding career plans, 270 oncologists (26.5%) reported a moderate or higher likelihood of reducing their clinical work hours in the next 12 months, 351 (34.3%) indicated a moderate or higher likelihood of leaving their current position within 24 months, and 273 (28.5%) planned to retire before 65 years of age. Multivariable analyses found women oncologists (odds ratio [OR], 0.458; P hour, 0.977; P work hours and leave current position on multivariable analysis. Satisfaction with WLB among US oncologists seems lower than for other medical specialties. Dissatisfaction with WLB shows a strong relationship with plans to reduce hours and leave current practice. Given the pending US oncologist shortage, additional studies exploring interactions among WLB, burnout, and career satisfaction and their impact on career and retirement plans are warranted.

  12. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    INTRODUCTION: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer...... trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  13. Rural Transformation and Planning Tactics in the 13th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    Luo; Xiaolong; Xu; Xiao; Li; Min

    2016-01-01

    Rural development has long been the focus of China’s central and local governments. Since the late 2000 s, rural areas have presented new transformation features and development trends. To stimulate rural transformation and development in the 13 th Five-Year Plan period, this paper reviews major ideas on rural development in related disciplines. This study also summarizes main rural transformation features, including the aging population, hollow villages, changes in the allocation of land resource, semi-urbanization, and regional differences in rural development. Finally, it also provides suggestions for planning tactics in the 13 th Five-Year Plan period, such as making differentiated rural development strategies, exploring new methods to stimulate rural stock land planning and use, and enforcing relevant policy and management reforms.

  14. Rural Transformation and Planning Tactics in the 13th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    Luo Xiaolong; Xu Xiao; Li Min

    2016-01-01

    Rural development has long been the focus of China's central and local governments.Since the late 2000s,rural areas have presented new transformation features and development trends.To stimulate rural transformation and development in the 13th Five-Year Plan period,this paPer reviews major ideas on rural development in related disciplines.This study also summarizes main rural transformation features,including the aging population,hollow villages,changes in the allocation of land resource,semi-urbanization,and regional differences in rural development.Finally,it also provides suggestions for planning tactics in the 13th Five-Year Plan period,such as making differentiated rural development strategies,exploring new methods to stimulate rural stock land planning and use,and enforcing relevant policy and management reforms.

  15. Power Distribution System Planning Evaluation by a Fuzzy Multi-Criteria Group Decision Support System

    Directory of Open Access Journals (Sweden)

    Tiefeng Zhang

    2010-10-01

    Full Text Available The evaluation of solutions is an important phase in power distribution system planning (PDSP which allows issues such as quality of supply, cost, social service and environmental implications to be considered and usually involves the judgments of a group of experts. The planning problem is thus suitable for the multi-criteria group decision-making (MCGDM method. The evaluation process and evaluation criteria often involve uncertainties incorporated in quantitative analysis with crisp values and qualitative judgments with linguistic terms; therefore, fuzzy sets techniques are applied in this study. This paper proposes a fuzzy multi-criteria group decision-making (FMCGDM method for PDSP evaluation and applies a fuzzy multi-criteria group decision support system (FMCGDSS to support the evaluation task. We introduce a PDSP evaluation model, which has evaluation criteria within three levels, based on the characteristics of a power distribution system. A case-based example is performed on a test distribution network and demonstrates how all the problems in a PDSP evaluation are addressed using FMCGDSS. The results are acceptable to expert evaluators.

  16. Program plan recognition for year 2000 tools

    NARCIS (Netherlands)

    A. van Deursen (Arie); S. Woods; A. Quilici

    1997-01-01

    textabstractThere are many commercial tools that address various aspects of the Year 2000 problem. None of these tools, however, make any documented use of plan-based techniques for automated concept recovery. This implies a general perception that plan-based techniques is not useful for this

  17. 40 CFR 35.107 - Work plans.

    Science.gov (United States)

    2010-07-01

    ... and evaluation of performance under the grant agreement. (2) An approvable work plan must specify: (i... and a time frame for their accomplishment; (iv) A performance evaluation process and reporting... environmental program grant if the portions of the Performance Partnership Agreement that serve as all or part...

  18. Cancer survivorship care-planning: Practice, research, and policy implications for social work.

    Science.gov (United States)

    Wagner, Richard W; Pritzker, Suzanne

    2016-01-01

    Increasing numbers of cancer survivors are living longer than 5 years from their diagnosis date. This has resulted in a growing population of cancer survivors, expected to reach 19 million by 2024. Survivors frequently experience late effects caused by cancer and its treatment, reducing survivors' quality of life in multiple domains. Survivorship care-plans may aid the many physical, psychosocial, and financial needs that emerge posttreatment. However, the lack of reimbursement mechanisms, the limited amount of effectiveness research, and minimal guidelines for content and delivery are barriers to the widespread provision of survivorship care-plans. Challenges and opportunities for social work practice, research, and policy are identified and discussed.

  19. Effects of multi-source feedback on developmental plans for leaders of postgraduate medical education

    DEFF Research Database (Denmark)

    Malling, Bente; Bonderup, Thomas; Mortensen, Lene

    2009-01-01

    for both management and leadership performance areas. The developmental plans mainly focused on management initiatives, whereas plans for the development of leadership performance were few. Areas rated low by all respondents were scarcely represented in CREs' developmental plans. CONCLUSIONS: An MSF...... process might in itself lead to development in administrative areas. However, MSF carried through as a single stand-alone procedure was not sufficient to foster plans for the development of leadership performance.......OBJECTIVES: Multi-source feedback (MSF) is a widely used developmental tool for leaders in organisations including those dealing with health care. This study was performed to examine the effects of an MSF process on developmental plans made by leaders of postgraduate medical education (PGME...

  20. Multi-centre audit of VMAT planning and pre-treatment verification.

    Science.gov (United States)

    Jurado-Bruggeman, Diego; Hernández, Victor; Sáez, Jordi; Navarro, David; Pino, Francisco; Martínez, Tatiana; Alayrach, Maria-Elena; Ailleres, Norbert; Melero, Alejandro; Jornet, Núria

    2017-08-01

    We performed a multi-centre intercomparison of VMAT dose planning and pre-treatment verification. The aims were to analyse the dose plans in terms of dosimetric quality and deliverability, and to validate whether in-house pre-treatment verification results agreed with those of an external audit. The nine participating centres encompassed different machines, equipment, and methodologies. Two mock cases (prostate and head and neck) were planned using one and two arcs. A plan quality index was defined to compare the plans and different complexity indices were calculated to check their deliverability. We compared gamma index pass rates using the centre's equipment and methodology to those of an external audit (global 3D gamma, absolute dose differences, 10% of maximum dose threshold). Log-file analysis was performed to look for delivery errors. All centres fulfilled the dosimetric goals but plan quality and delivery complexity were heterogeneous and uncorrelated, depending on the manufacturer and the planner's methodology. Pre-treatment verifications results were within tolerance in all cases for gamma 3%-3mm evaluation. Nevertheless, differences between the external audit and in-house measurements arose due to different equipment or methodology, especially for 2%-2mm criteria with differences up to 20%. No correlation was found between complexity indices and verification results amongst centres. All plans fulfilled dosimetric constraints, but plan quality and complexity did not correlate and were strongly dependent on the planner and the vendor. In-house measurements cannot completely replace external audits for credentialing. Copyright © 2017 Elsevier B.V. All rights reserved.

  1. Translator Plan: A Coordinated Vision for Fiscal Years 2018-2020

    Energy Technology Data Exchange (ETDEWEB)

    Riihimaki, Laura [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Comstock, Jennifer [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Collis, Scott [Argonne National Lab. (ANL), Argonne, IL (United States); Flynn, Connor [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Giangrande, Scott [Brookhaven National Lab. (BNL), Upton, NY (United States); Monroe, Justin [University of Oklahoma; Sivaraman, Chitra [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Xie, Shaocheng [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2018-01-30

    In June of 2017, the Translator Group met to develop this coordinated three-year vision plan, incorporating key feedback and aligning to ARM’s mission priorities. This plan responds to a shift in how we determine our priorities, given the new needs of the ARM Facility. In the past, individual Translators have determined priorities in conversation with individual DOE Atmospheric System Research (ASR) working groups. To better support ARM’s Decadal Vision (https://www.arm.gov/publications/programdocs/doe-sc-arm-14-029.pdf), however, the Translator Group is instead developing a coordinated response to needs from our user community to better balance resources and skills among participants. This approach agrees with direction from ARM leadership and the ARM-ASR Coordination Team (AACT). To develop this plan the Translator Group reviewed feedback received from the User Executive Committee (UEC) and the Triennial Review, as well as priorities from ASR working groups and Principal Investigators (PIs), the LES ARM Symbiotic Simulation and Observation (LASSO) project, and new instrumentation and activities as described by the ARM Technical Director. In particular, we are responding to the advice that we were trying to do too much, and should focus on providing additional support to data quality, uncertainty assessment, a timeline for producing core VAPs from ARM Mobile Facility (AMF) campaigns, and supporting key aspects of the Decadal Vision.

  2. Sectored Clean-up Work Plan for Housekeeping Category Waste Sites

    International Nuclear Information System (INIS)

    Nacht, S. J.

    2000-01-01

    The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs

  3. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  4. Planning and Evaluating Educational Work in Slovene Preschools

    Directory of Open Access Journals (Sweden)

    Marcela Batistič Zorec

    2012-01-01

    Full Text Available The present article examines the changes in Slovene preschools subsequent to Slovenia’s independence in 1991. In the socialist period, the national education programme for preschools was highly structured, goaland content-oriented and subject to schoolization. The Curriculum for Preschools (1999 brought conceptual changes towards education “based on the child” and the process approach, as well as giving more autonomy to preschool teachers and their assistants. In the empirical study, we examine changes in planning and evaluating educational work compared to the past. The results show that the majority of professional workers have reduced the high level of structure and rigidity in planning, and that there is better cooperation between preschool teachers and teachers’ assistants. Unlike in the past, most professional workers regularly evaluate their educational work. As the data was gathered in two phases, before and after the training of professional workers in the Reggio Emilia concept, we also search for the (probably indirect influencesof this training. We conclude that after the training the participation of children in planning and evaluating educational work is higher.

  5. Radiological Work Planning and Procedures

    International Nuclear Information System (INIS)

    KURTZ, J.E.

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD

  6. Revised Fifth Five Year Economic and Social Development Plan, 1984-1986.

    Science.gov (United States)

    1987-01-01

    This document contains provisions of chapter 6 (Promoting Social Development) of the Revised Fifth Five-Year Economic and Social Development Plan (1984-86) of the Republic of Korea. The plan calls for the efficient control of population growth by targeting intensive efforts to women 20-30 years old, eradicating the traditional preference for male children, providing incentives to foster a small family norm, and discouraging couples from having too many children. Family planning (FP) programs will be expanded to increase the contraceptive prevalence rate and improve the quality of contraceptive services. Emphasis will be placed on women 34 years or younger residing in poor urban and remote rural areas. The emphasis of the evaluations of FP guidance and evaluation teams will be on the actual prevention of birth rather than on the contraceptive use ratio, and the FP program will be linked to other health and medical schemes. Families with 2 children or less will receive extended medical services and free kindergarten tuition. Families with 3 or more children may face discriminatory policy measures. The Family Law will be amended to allow daughters to inherit, the Medical Insurance Law will be changed to allow family members dependent upon female workers to be insured, and social institutions hindering female participation in the work force will be banned. The dissemination of FP information and population education will be expanded.

  7. SNL Five-Year Facilities & Infrastructure Plan FY2015-2019

    Energy Technology Data Exchange (ETDEWEB)

    Cipriani, Ralph J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-12-01

    Sandia’s development vision is to provide an agile, flexible, safer, more secure, and efficient enterprise that leverages the scientific and technical capabilities of the workforce and supports national security requirements in multiple areas. Sandia’s Five-Year Facilities & Infrastructure Planning program represents a tool to budget and prioritize immediate and short-term actions from indirect funding sources in light of the bigger picture of proposed investments from direct-funded, Work for Others and other funding sources. As a complementary F&I investment program, Sandia’s indirect investment program supports incremental achievement of the development vision within a constrained resource environment.

  8. 29 CFR 825.211 - Maintenance of benefits under multi-employer health plans.

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.211 Maintenance of benefits under multi-employer health plans. (a) A... that the employee would have been laid off and the employment relationship terminated; or, (3) The...

  9. Idaho National Laboratory Ten-year Site Plan (2012 through 2021) -- DOE-NE's National Nuclear Capability -- Developing and Maintaining the INL Infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Cal Ozaki

    2010-06-01

    To meet long-term objectives to transform the Idaho National Laboratory (INL), we are providing an integrated, long-term vision of infrastructure requirements that support research, development and demonstration (RD&D) goals outlined in the DOE strategic plans, including the NE Roadmap and reports such as Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook. The goal of the INL Ten-year Site Plan (TYSP) is to clearly link RD&D mission goals and INL core capabilities with infrastructure requirements (single and multi-program), establish the 10-year end-state vision for INL complexes, identify and prioritize infrastructure and capability gaps, as well as the most efficient and economic approaches to closing those gaps.

  10. Fiscal years 1994--1998 Information Technology Strategic Plan

    International Nuclear Information System (INIS)

    1993-11-01

    A team of senior managers from across the US Nuclear Regulatory Commission (NRC), working with the Office of Information Resources Management (IRM), has completed an NRC Strategic Information Technology (IT) Plan. The Plan addresses three major areas: (1) IT Program Management, (2) IT Infrastructure, and (3) Information and Applications Management. Key recommendations call for accelerating the replacement of Agency workstations, implementing a new document management system, applying business process reengineering to selected Agency work processes, and establishing an Information Technology Council to advise the Director of IRM

  11. Multi-objective optimization in systematic conservation planning and the representation of genetic variability among populations.

    Science.gov (United States)

    Schlottfeldt, S; Walter, M E M T; Carvalho, A C P L F; Soares, T N; Telles, M P C; Loyola, R D; Diniz-Filho, J A F

    2015-06-18

    Biodiversity crises have led scientists to develop strategies for achieving conservation goals. The underlying principle of these strategies lies in systematic conservation planning (SCP), in which there are at least 2 conflicting objectives, making it a good candidate for multi-objective optimization. Although SCP is typically applied at the species level (or hierarchically higher), it can be used at lower hierarchical levels, such as using alleles as basic units for analysis, for conservation genetics. Here, we propose a method of SCP using a multi-objective approach. We used non-dominated sorting genetic algorithm II in order to identify the smallest set of local populations of Dipteryx alata (baru) (a Brazilian Cerrado species) for conservation, representing the known genetic diversity and using allele frequency information associated with heterozygosity and Hardy-Weinberg equilibrium. We worked in 3 variations for the problem. First, we reproduced a previous experiment, but using a multi-objective approach. We found that the smallest set of populations needed to represent all alleles under study was 7, corroborating the results of the previous study, but with more distinct solutions. In the 2nd and 3rd variations, we performed simultaneous optimization of 4 and 5 objectives, respectively. We found similar but refined results for 7 populations, and a larger portfolio considering intra-specific diversity and persistence with populations ranging from 8-22. This is the first study to apply multi-objective algorithms to an SCP problem using alleles at the population level as basic units for analysis.

  12. Multi-criteria ACO-based Algorithm for Ship’s Trajectory Planning

    Directory of Open Access Journals (Sweden)

    Agnieszka Lazarowska

    2017-03-01

    Full Text Available The paper presents a new approach for solving a path planning problem for ships in the environment with static and dynamic obstacles. The algorithm utilizes a heuristic method, classified to the group of Swarm Intelligence approaches, called the Ant Colony Optimization. The method is inspired by a collective behaviour of ant colonies. A group of agents - artificial ants searches through the solution space in order to find a safe, optimal trajectory for a ship. The problem is considered as a multi-criteria optimization task. The criteria taken into account during problem solving are: path safety, path length, the International Regulations for Preventing Collisions at Sea (COLREGs compliance and path smoothness. The paper includes the description of the new multi-criteria ACO-based algorithm along with the presentation and discussion of simulation tests results.

  13. A stochastic multi-agent optimization model for energy infrastructure planning under uncertainty and competition.

    Science.gov (United States)

    2017-07-04

    This paper presents a stochastic multi-agent optimization model that supports energy infrastruc- : ture planning under uncertainty. The interdependence between dierent decision entities in the : system is captured in an energy supply chain network, w...

  14. Work-related determinants of multi-site musculoskeletal pain among employees in the health care sector.

    Science.gov (United States)

    Neupane, Subas; Nygård, Clas-Håkan; Oakman, Jodi

    2016-06-16

    Work-related musculoskeletal pain is a major occupational problem. Those with pain in multiple sites usually report worse health outcomes than those with pain in one site. This study explored prevalence and associated predictors of multi-site pain in health care sector employees. Survey responses from 1348 health care sector employees across three organisations (37% response rate) collected data on job satisfaction, work life balance, psychosocial and physical hazards, general health and work ability. Musculoskeletal discomfort was measured across 5 body regions with pain in ≥ 2 sites defined as multi-site pain. Generalized linear models were used to identify relationships between work-related factors and multi-site pain. Over 52% of the employees reported pain in multiple body sites and 19% reported pain in one site. Poor work life balance (PRR = 2.33, 95% CI = 1.06-5.14). physical (PRR = 7.58, 95% CI = 4.89-11.77) and psychosocial (PRR = 1.59, 95% CI = 1.00-2.57) hazard variables were related to multi-site pain (after controlling for age, gender, health and work ability. Older employees and females were more likely to report multi-site pain. Effective risk management of work related multi-site pain must include identification and control of psychosocial and physical hazards.

  15. Learners’ processes during pre-task planning and Working Memory Capacity

    Directory of Open Access Journals (Sweden)

    Maria da Gloria Tavares

    2016-01-01

    Full Text Available http://dx.doi.org/10.5007/2175-8026.2016v69n1p79 The present study is part of a larger scale research (Guará-Tavares, 2011, 2013 that investigates the relationship among working memory capacity, pre-task planning, and L2 speech performance. The aim of the study was to analyze 1 what processes learners engage during pre-task planning, and 2 whether higher and lower working memory spans engage in different processes during pre-task planning. Learners’ processes were accessed by means of think aloud protocols and a retrospective interview. Working memory capacity was measured by the Speaking Span Test. Results show that learners engage mainly in organization of ideas, rehearsal, lexical searches, and monitoring.. Moreover, higher spans employ significantly more metacognitive strategies during planning when compared to lower spans.

  16. Work-Plan Heroes: Student Strategies in Lower-Secondary Norwegian Classrooms

    Science.gov (United States)

    Dalland, Cecilie P.; Klette, Kirsti

    2014-01-01

    This article explores how individualized teaching methods, such as the use of work plans, create new student strategies in Norwegian lower secondary classrooms. Work plans, which are frequently set up as instructional tools in Norwegian classrooms, outline different types of tasks and requirements that the students are supposed to do during a…

  17. SU-F-T-613: Multi-Lesion Cranial SRS VMAT Plan Quality

    International Nuclear Information System (INIS)

    Ballangrud, A; Kuo, L; Happersett, L; Lim, S; Li, X; Beal, K; Yamada, Y; LoSasso, T; Mechalakos, J

    2016-01-01

    Purpose: Cranial SRS VMAT plans must have steep dose gradient around each target to reduce dose to normal brain. This study reports on the correlation between gradient index (GI=V50%/V100%), target size and target dose heterogeneity index (HI=PTV Dmax/prescription dose) for multi-lesion cranial SRS VMAT plans. Methods: VMAT plans for 10 cranial cases with 3 to 6 lesions (total 39 lesions) generated in Varian Eclipse V11.0.47 with a fine-tuned AAA beam model and 0.125 cm dose grid were analyzed. One or two iso centers were used depending on the spatial distribution of lesions. Two to nine coplanar and non-coplanar arcs were used per isocenter. Conformity index (CI= V100%/VPTV), HI, and GI were determined for each lesion. Dose to critical structures were recorded. Results: Lesion size ranged from 0.05–11.00 cm3. HI ranged from 1.2–1.4, CI ranged from 1.0–2.8 and GI from 3.1–8.4. Maximum dose to brainstem, chiasm, lenses, optic nerves and eyes ranged from 120–1946 cGy, 47–463 cGy, 9–121 cGy, 14–512 cGy, and 17–294 cGy, respectively. Brain minus PTV (Brain-PTV) V7Gy was in the range 1.1–6.5%, and Brain-PTV Dmean was in the range 94–324 cGy. Conclusion: This work shows that a GI 0.4cc. For smaller lesions, GI increases rapidly. GI is lower when HI is increased. Based on this study, recommend HI is 1.4, and recommended GI is for volumes 1.0cc GI<4. CI is < 1.3 for all lesions except for targets < 0.1cc. Cranial SRS VMAT plans must be optimized to lower the GI to reduce the dose to normal brain tissue.

  18. An inexact multi-objective programming approach for strategic environmental assessment on regional development plan

    Institute of Scientific and Technical Information of China (English)

    WANG Jihua; GUO Huaicheng; LIU Lei; HAO Mingjia; ZHANG Ming; LU Xiaojian; XING Kexia

    2004-01-01

    This paper presents the development of an inexact multi-objective programming (IMOP) model and its application to the strategic environmental assessment (SEA) for the regional development plan for the Hunnan New Zone (HNZ) in Shenyang City, China. Inexact programming and multi-objective programming methods are employed to effectively account for extensive uncertainties in the study system and to reflect various interests from different stakeholders, respectively. In the case study, balancing-economy-and-environment scenario and focusing-industry-development scenario are analyzed by the interactive solution process for addressing the preferences from local authorities and compromises among different objectives. Through interpreting the model solutions under both scenarios, analysis of industrial structure, waste water treatment plant(WWTP) expansion, water consumption and pollution generation and treatment are undertaken for providing a solid base to justify and evaluate the HNZ regional development plan. The study results show that the developed IMOP-SEA framework is feasible and applicable in carrying comprehensive environmental impact assessments for development plan in a more effective and efficient manner.

  19. Algorithm Design of CPCI Backboard's Interrupts Management Based on VxWorks' Multi-Tasks

    Science.gov (United States)

    Cheng, Jingyuan; An, Qi; Yang, Junfeng

    2006-09-01

    This paper begins with a brief introduction of the embedded real-time operating system VxWorks and CompactPCI standard, then gives the programming interfaces of Peripheral Controller Interface (PCI) configuring, interrupts handling and multi-tasks programming interface under VxWorks, and then emphasis is placed on the software frameworks of CPCI interrupt management based on multi-tasks. This method is sound in design and easy to adapt, ensures that all possible interrupts are handled in time, which makes it suitable for data acquisition systems with multi-channels, a high data rate, and hard real-time high energy physics.

  20. Planning an organizational wellness initiative at a multi-state social service agency.

    Science.gov (United States)

    Miller, J Jay; Grise-Owens, Erlene; Addison, Donia; Marshall, Midaya; Trabue, Donna; Escobar-Ratliff, Laura

    2016-06-01

    Increasingly, organizations in general, and social service organizations, specifically, are recognizing the importance of planning and evaluating organizational wellness initiatives. Yet, few participatory models for carrying out these aims exist. For this study, researchers utilized concept mapping (CM) to explicate a conceptual framework for planning, and subsequently evaluating, a wellness initiative at a multi-state social service organization. CM is a participatory approach that analyzes qualitative data via multi-dimensional scaling and hierarchical cluster analyses. Outputs include a number of visual depictions that allow researchers to explore complex relationships among sets of the data. Results from this study indicated that participants (N=64), all of whom were employees of the agency, conceptualized organizational wellness via an eight-cluster solution, or Concept Map. Priority areas of this framework, specifically importance and feasibility, were also explored. After a brief review of pertinent literature, this article explicates the CM methodology utilized in this study, describes results, discusses lessons learned, and identifies apt areas for future research. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. Improved efficiency of multi-criteria IMPT treatment planning using iterative resampling of randomly placed pencil beams

    Science.gov (United States)

    van de Water, S.; Kraan, A. C.; Breedveld, S.; Schillemans, W.; Teguh, D. N.; Kooy, H. M.; Madden, T. M.; Heijmen, B. J. M.; Hoogeman, M. S.

    2013-10-01

    This study investigates whether ‘pencil beam resampling’, i.e. iterative selection and weight optimization of randomly placed pencil beams (PBs), reduces optimization time and improves plan quality for multi-criteria optimization in intensity-modulated proton therapy, compared with traditional modes in which PBs are distributed over a regular grid. Resampling consisted of repeatedly performing: (1) random selection of candidate PBs from a very fine grid, (2) inverse multi-criteria optimization, and (3) exclusion of low-weight PBs. The newly selected candidate PBs were added to the PBs in the existing solution, causing the solution to improve with each iteration. Resampling and traditional regular grid planning were implemented into our in-house developed multi-criteria treatment planning system ‘Erasmus iCycle’. The system optimizes objectives successively according to their priorities as defined in the so-called ‘wish-list’. For five head-and-neck cancer patients and two PB widths (3 and 6 mm sigma at 230 MeV), treatment plans were generated using: (1) resampling, (2) anisotropic regular grids and (3) isotropic regular grids, while using varying sample sizes (resampling) or grid spacings (regular grid). We assessed differences in optimization time (for comparable plan quality) and in plan quality parameters (for comparable optimization time). Resampling reduced optimization time by a factor of 2.8 and 5.6 on average (7.8 and 17.0 at maximum) compared with the use of anisotropic and isotropic grids, respectively. Doses to organs-at-risk were generally reduced when using resampling, with median dose reductions ranging from 0.0 to 3.0 Gy (maximum: 14.3 Gy, relative: 0%-42%) compared with anisotropic grids and from -0.3 to 2.6 Gy (maximum: 11.4 Gy, relative: -4%-19%) compared with isotropic grids. Resampling was especially effective when using thin PBs (3 mm sigma). Resampling plans contained on average fewer PBs, energy layers and protons than anisotropic

  2. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  3. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  4. Outline of electric power facility plan in fiscal year 1988

    International Nuclear Information System (INIS)

    1988-01-01

    As to the electric power facility plan in fiscal year 1988, 15 designated electric power enterprises made the notification to the Minister of International Trade and Industry in March, 1988. This outline of the facility plan summarized the plans of 66 enterprises in total, including the plans of municipally operated, joint thermal power and other enterprises in addition to the above 15. In order to ensure the stable supply of electric power, the Ministry of International Trade and Industry considers that it is indispensable to purposefully develop electric power sources and the facilities for distribution along this facility plan. The forecast for fiscal year 1997 is : total electric power demand 778.2 billion kWh, maximum power demand 151.21 million kW, and yearly load factor 56.9 %. This is equivalent to the yearly growth of 2.4 %. In fiscal year 1988, it is planned to present 29 plants of 2760 MW to the Power Source Development Coordination Council. The breakdown is : hydroelectricity 140 MW, thermal power 2010 MW, and nuclear power 610 MW. The Ministry guides electric power enterprises so as to realize the diversification of electric power sources. Also the increase of transmission and transformation facilities, the plan of equipment investment and others are reported. (Kako, I.)

  5. INTEGRATED METHODOLOGY FOR PRODUCT PLANNING USING MULTI CRITERIA ANALYSIS

    Directory of Open Access Journals (Sweden)

    Tarun Soota

    2016-09-01

    Full Text Available Integrated approach to multi-criteria decision problems is proposed using quality function deployment and analytical network process. The objective of the work is to rationalize and improve the method of analyzing and interpreting customer needs and technical requirements. The methodology is used to determine, prioritize engineering requirements based on customer needs for development of best product. Framework allows decision maker to decompose a complex problem in a hierarchical structure to show relationship between objective and criteria. Multi-criteria decision modeling is used for extending the hierarchy process to both dependence and feedback. A case study on bikes is presented for the proposed model.

  6. Exploring team working and shared leadership in multi-disciplinary cancer care.

    Science.gov (United States)

    Willcocks, Stephen George

    2018-02-05

    Purpose The purpose of this paper is to explore the relevance of shared leadership to multi-disciplinary cancer care. It examines the policy background and applies concepts from shared leadership to this context. It includes discussion of the implications and recommendations. Design/methodology/approach This is a conceptual paper examining policy documents and secondary literature on the topic. While it focuses on the UK National Health Services, it is also relevant to other countries given they follow a broadly similar path with regard to multi-disciplinary working. Findings The paper suggests that shared leadership is a possible way forward for multi-disciplinary cancer care, particularly as policy developments are supportive of this. It shows that a shared perspective is likely to be beneficial to the further development of multi-disciplinary working. Research limitations/implications Adopting shared leadership needs to be explored further using appropriate empirical research. Practical implications The paper offers comments on the implications of introducing shared leadership and makes recommendations including being aware of the barriers to its implementation. Originality/value The paper offers an alternative view on leadership in the health-care context.

  7. 76 FR 35426 - Denali Commission Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2011-06-17

    ... developing access to construction trades through the enhancement of construction career pathways and the... providing an opportunity for a 30- day period of public review and written comment. During this time, the... Technology Program $2,400,000 Bulk Fuel/RPSU Planning, Design & $3,770,350 Construction. Renewable Energy...

  8. Integration of Nevada Test Site (NTS) Work Control Programs and Incorporating Integrated Safety Management (ISM) into Activity Level Work Planning and Control

    International Nuclear Information System (INIS)

    Kinney, Mike; Breen, Kevin

    2008-01-01

    This session will examine a method developed by Federal and Contractor personnel at the Nevada Site Office (NSO) to improve the planning and execution of work activities utilizing an Activity Level Work Control process in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations. The process was initially developed during Fiscal Year (FY) 2007, and implementation is commencing during the fourth quarter of FY 2008. This process will significantly enhance the flexibility and the appropriate rigor in the performance of work activities

  9. ALARA database value in future outage work planning and dose management

    International Nuclear Information System (INIS)

    Miller, D.W.; Green, W.H.

    1995-01-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system's ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed

  10. ALARA database value in future outage work planning and dose management

    Energy Technology Data Exchange (ETDEWEB)

    Miller, D.W.; Green, W.H. [Clinton Power Station Illinois Power Co., IL (United States)

    1995-03-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.

  11. Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm

    Science.gov (United States)

    Ausaf, Muhammad Farhan; Gao, Liang; Li, Xinyu

    2015-12-01

    For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.

  12. PUREX facility preclosure work plan

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D)

  13. A Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty

    Directory of Open Access Journals (Sweden)

    Houssem Felfel

    2015-11-01

    Full Text Available In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, the amount of backorder and the quantity of products to be transported between upstream and downstream plants in each period are considered. The robustness of production supply chain plan is then evaluated using statistical and risk measures. A case study from a real textile and apparel industry is shown in order to compare the performances of the proposed stochastic programming model and the deterministic model.

  14. An Adaptive Multi-Objective Particle Swarm Optimization Algorithm for Multi-Robot Path Planning

    Directory of Open Access Journals (Sweden)

    Nizar Hadi Abbas

    2016-07-01

    Full Text Available This paper discusses an optimal path planning algorithm based on an Adaptive Multi-Objective Particle Swarm Optimization Algorithm (AMOPSO for two case studies. First case, single robot wants to reach a goal in the static environment that contain two obstacles and two danger source. The second one, is improving the ability for five robots to reach the shortest way. The proposed algorithm solves the optimization problems for the first case by finding the minimum distance from initial to goal position and also ensuring that the generated path has a maximum distance from the danger zones. And for the second case, finding the shortest path for every robot and without any collision between them with the shortest time. In order to evaluate the proposed algorithm in term of finding the best solution, six benchmark test functions are used to make a comparison between AMOPSO and the standard MOPSO. The results show that the AMOPSO has a better ability to get away from local optimums with a quickest convergence than the MOPSO. The simulation results using Matlab 2014a, indicate that this methodology is extremely valuable for every robot in multi-robot framework to discover its own particular proper pa‌th from the start to the destination position with minimum distance and time.

  15. The Single And Multi Project Approach To Planning And Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2008-01-01

    The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced with the chall......The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced...

  16. Comparative analysis of Pareto surfaces in multi-criteria IMRT planning

    Energy Technology Data Exchange (ETDEWEB)

    Teichert, K; Suess, P; Serna, J I; Monz, M; Kuefer, K H [Department of Optimization, Fraunhofer Institute for Industrial Mathematics (ITWM), Fraunhofer Platz 1, 67663 Kaiserslautern (Germany); Thieke, C, E-mail: katrin.teichert@itwm.fhg.de [Clinical Cooperation Unit Radiation Oncology, German Cancer Research Center, Im Neuenheimer Feld 280, 69120 Heidelberg (Germany)

    2011-06-21

    In the multi-criteria optimization approach to IMRT planning, a given dose distribution is evaluated by a number of convex objective functions that measure tumor coverage and sparing of the different organs at risk. Within this context optimizing the intensity profiles for any fixed set of beams yields a convex Pareto set in the objective space. However, if the number of beam directions and irradiation angles are included as free parameters in the formulation of the optimization problem, the resulting Pareto set becomes more intricate. In this work, a method is presented that allows for the comparison of two convex Pareto sets emerging from two distinct beam configuration choices. For the two competing beam settings, the non-dominated and the dominated points of the corresponding Pareto sets are identified and the distance between the two sets in the objective space is calculated and subsequently plotted. The obtained information enables the planner to decide if, for a given compromise, the current beam setup is optimal. He may then re-adjust his choice accordingly during navigation. The method is applied to an artificial case and two clinical head neck cases. In all cases no configuration is dominating its competitor over the whole Pareto set. For example, in one of the head neck cases a seven-beam configuration turns out to be superior to a nine-beam configuration if the highest priority is the sparing of the spinal cord. The presented method of comparing Pareto sets is not restricted to comparing different beam angle configurations, but will allow for more comprehensive comparisons of competing treatment techniques (e.g. photons versus protons) than with the classical method of comparing single treatment plans.

  17. Comparative analysis of Pareto surfaces in multi-criteria IMRT planning.

    Science.gov (United States)

    Teichert, K; Süss, P; Serna, J I; Monz, M; Küfer, K H; Thieke, C

    2011-06-21

    In the multi-criteria optimization approach to IMRT planning, a given dose distribution is evaluated by a number of convex objective functions that measure tumor coverage and sparing of the different organs at risk. Within this context optimizing the intensity profiles for any fixed set of beams yields a convex Pareto set in the objective space. However, if the number of beam directions and irradiation angles are included as free parameters in the formulation of the optimization problem, the resulting Pareto set becomes more intricate. In this work, a method is presented that allows for the comparison of two convex Pareto sets emerging from two distinct beam configuration choices. For the two competing beam settings, the non-dominated and the dominated points of the corresponding Pareto sets are identified and the distance between the two sets in the objective space is calculated and subsequently plotted. The obtained information enables the planner to decide if, for a given compromise, the current beam setup is optimal. He may then re-adjust his choice accordingly during navigation. The method is applied to an artificial case and two clinical head neck cases. In all cases no configuration is dominating its competitor over the whole Pareto set. For example, in one of the head neck cases a seven-beam configuration turns out to be superior to a nine-beam configuration if the highest priority is the sparing of the spinal cord. The presented method of comparing Pareto sets is not restricted to comparing different beam angle configurations, but will allow for more comprehensive comparisons of competing treatment techniques (e.g., photons versus protons) than with the classical method of comparing single treatment plans.

  18. Comparative analysis of Pareto surfaces in multi-criteria IMRT planning

    International Nuclear Information System (INIS)

    Teichert, K; Suess, P; Serna, J I; Monz, M; Kuefer, K H; Thieke, C

    2011-01-01

    In the multi-criteria optimization approach to IMRT planning, a given dose distribution is evaluated by a number of convex objective functions that measure tumor coverage and sparing of the different organs at risk. Within this context optimizing the intensity profiles for any fixed set of beams yields a convex Pareto set in the objective space. However, if the number of beam directions and irradiation angles are included as free parameters in the formulation of the optimization problem, the resulting Pareto set becomes more intricate. In this work, a method is presented that allows for the comparison of two convex Pareto sets emerging from two distinct beam configuration choices. For the two competing beam settings, the non-dominated and the dominated points of the corresponding Pareto sets are identified and the distance between the two sets in the objective space is calculated and subsequently plotted. The obtained information enables the planner to decide if, for a given compromise, the current beam setup is optimal. He may then re-adjust his choice accordingly during navigation. The method is applied to an artificial case and two clinical head neck cases. In all cases no configuration is dominating its competitor over the whole Pareto set. For example, in one of the head neck cases a seven-beam configuration turns out to be superior to a nine-beam configuration if the highest priority is the sparing of the spinal cord. The presented method of comparing Pareto sets is not restricted to comparing different beam angle configurations, but will allow for more comprehensive comparisons of competing treatment techniques (e.g. photons versus protons) than with the classical method of comparing single treatment plans.

  19. SU-E-T-395: Multi-GPU-Based VMAT Treatment Plan Optimization Using a Column-Generation Approach

    International Nuclear Information System (INIS)

    Tian, Z; Shi, F; Jia, X; Jiang, S; Peng, F

    2014-01-01

    Purpose: GPU has been employed to speed up VMAT optimizations from hours to minutes. However, its limited memory capacity makes it difficult to handle cases with a huge dose-deposition-coefficient (DDC) matrix, e.g. those with a large target size, multiple arcs, small beam angle intervals and/or small beamlet size. We propose multi-GPU-based VMAT optimization to solve this memory issue to make GPU-based VMAT more practical for clinical use. Methods: Our column-generation-based method generates apertures sequentially by iteratively searching for an optimal feasible aperture (referred as pricing problem, PP) and optimizing aperture intensities (referred as master problem, MP). The PP requires access to the large DDC matrix, which is implemented on a multi-GPU system. Each GPU stores a DDC sub-matrix corresponding to one fraction of beam angles and is only responsible for calculation related to those angles. Broadcast and parallel reduction schemes are adopted for inter-GPU data transfer. MP is a relatively small-scale problem and is implemented on one GPU. One headand- neck cancer case was used for test. Three different strategies for VMAT optimization on single GPU were also implemented for comparison: (S1) truncating DDC matrix to ignore its small value entries for optimization; (S2) transferring DDC matrix part by part to GPU during optimizations whenever needed; (S3) moving DDC matrix related calculation onto CPU. Results: Our multi-GPU-based implementation reaches a good plan within 1 minute. Although S1 was 10 seconds faster than our method, the obtained plan quality is worse. Both S2 and S3 handle the full DDC matrix and hence yield the same plan as in our method. However, the computation time is longer, namely 4 minutes and 30 minutes, respectively. Conclusion: Our multi-GPU-based VMAT optimization can effectively solve the limited memory issue with good plan quality and high efficiency, making GPUbased ultra-fast VMAT planning practical for real clinical use

  20. SU-E-T-395: Multi-GPU-Based VMAT Treatment Plan Optimization Using a Column-Generation Approach

    Energy Technology Data Exchange (ETDEWEB)

    Tian, Z; Shi, F; Jia, X; Jiang, S [UT Southwestern Medical Ctr at Dallas, Dallas, TX (United States); Peng, F [Carnegie Mellon University, Pittsburgh, PA (United States)

    2014-06-01

    Purpose: GPU has been employed to speed up VMAT optimizations from hours to minutes. However, its limited memory capacity makes it difficult to handle cases with a huge dose-deposition-coefficient (DDC) matrix, e.g. those with a large target size, multiple arcs, small beam angle intervals and/or small beamlet size. We propose multi-GPU-based VMAT optimization to solve this memory issue to make GPU-based VMAT more practical for clinical use. Methods: Our column-generation-based method generates apertures sequentially by iteratively searching for an optimal feasible aperture (referred as pricing problem, PP) and optimizing aperture intensities (referred as master problem, MP). The PP requires access to the large DDC matrix, which is implemented on a multi-GPU system. Each GPU stores a DDC sub-matrix corresponding to one fraction of beam angles and is only responsible for calculation related to those angles. Broadcast and parallel reduction schemes are adopted for inter-GPU data transfer. MP is a relatively small-scale problem and is implemented on one GPU. One headand- neck cancer case was used for test. Three different strategies for VMAT optimization on single GPU were also implemented for comparison: (S1) truncating DDC matrix to ignore its small value entries for optimization; (S2) transferring DDC matrix part by part to GPU during optimizations whenever needed; (S3) moving DDC matrix related calculation onto CPU. Results: Our multi-GPU-based implementation reaches a good plan within 1 minute. Although S1 was 10 seconds faster than our method, the obtained plan quality is worse. Both S2 and S3 handle the full DDC matrix and hence yield the same plan as in our method. However, the computation time is longer, namely 4 minutes and 30 minutes, respectively. Conclusion: Our multi-GPU-based VMAT optimization can effectively solve the limited memory issue with good plan quality and high efficiency, making GPUbased ultra-fast VMAT planning practical for real clinical use.

  1. Parents as Role Models: Parental Behavior Affects Adolescents' Plans for Work Involvement

    Science.gov (United States)

    Wiese, Bettina S.; Freund, Alexandra M.

    2011-01-01

    This study (N = 520 high-school students) investigates the influence of parental work involvement on adolescents' own plans regarding their future work involvement. As expected, adolescents' perceptions of parental work behavior affected their plans for own work involvement. Same-sex parents served as main role models for the adolescents' own…

  2. TRIUMF: Five-year plan

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The Canadian government recently announced approval of a five-year-plan for TRIUMF, giving the Vancouver Laboratory assured funding until the year 2000. Besides continuation of the multidisciplinary cyclotron, this will allow construction of ISAC-1, a new on-line isotope separator. At the same time, TRIUMF will also be responsible for Canadian ''in-kind'' contributions to international science at CERN's LHC proton-proton collider (see page 1). The federal plan strengthens TRIUMF's role as a national facility, run by a consortium of universities across Canada. In addition, TRIUMF will have even stronger international links. The federal government has allocated a total of $166.6 million to TRIUMF over the next five years. In addition, the provincial British Columbia government, a long-time supporter of TRIUMF, has already agreed to provide approximately $10 million for conventional construction. The nature of the accelerator contributions to the LHC has not been finally decided, although two areas are under discussion - the upgrade of the accelerator chain, and construction of the two 'beam cleaning' insertions. The former would involve provision of various new systems (radiofrequency, magnets, power supplies, kickers, etc) for the Booster, PS and SPS synchrotrons; indeed activity is already underway in some areas, such as model studies for a new 40 MHz system for the PS. The acronym of the new facility, ISAC-1, is short for Isotope Separator & Accelerator. A prototype first stage already exists in TRIUMF. ISAC-1 will use the intense proton beam from the TRIUMF cyclotron to create powerful beams of exotic, short-lived, radioactive nuclei which will be accelerated in a new structure

  3. The IAEA and Y2K. The Agency's action plan on the year 2000 problem

    International Nuclear Information System (INIS)

    Cherif, H.S.; Winkels, J.

    1999-01-01

    The article describes the aims of it IAEA action plan concerned with Year 2000 (Y2K) problem and the results achieved during four years of work, including the technical documents dealing with the Y2K computer problem, published by IAEA. This include IAEA systems and operations, contingency plans, coordination in the United Nations system. Through the IAEA Internet site, a series of Web pages were developed by the Division of Public Information to co-ordinate the global exchange of information on the IAEA Y2K activities and related topics. The site is open to Member States and international organisations within and outside United Nations system

  4. Power generation in the 12-th five-year plan

    International Nuclear Information System (INIS)

    Troitskij, A.A.

    1986-01-01

    The state of electric power generation in the 11-th five-year plan is summed up. Perspectives of development of heat and electric power generation in the 12-th five-year plan are considered. Thermal power generation of NPPs in 1990 will increase by a factor of 8.4 as compared with 1975. The NPP development will be mainly realized on the basis of the WWER-1000 type reactors. It is planned to commission fast reactors of up to 800 MW

  5. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  6. Long working hours as a risk factor for atrial fibrillation: a multi-cohort study

    Science.gov (United States)

    Kivimäki, Mika; Nyberg, Solja T.; Batty, G. David; Kawachi, Ichiro; Jokela, Markus; Alfredsson, Lars; Bjorner, Jakob B.; Borritz, Marianne; Burr, Hermann; Dragano, Nico; Fransson, Eleonor I.; Heikkilä, Katriina; Knutsson, Anders; Koskenvuo, Markku; Kumari, Meena; Madsen, Ida E.H.; Nielsen, Martin L.; Nordin, Maria; Oksanen, Tuula; Pejtersen, Jan H.; Pentti, Jaana; Rugulies, Reiner; Salo, Paula; Shipley, Martin J.; Suominen, Sakari; Theorell, Töres; Vahtera, Jussi; Westerholm, Peter; Westerlund, Hugo; Steptoe, Andrew; Singh-Manoux, Archana; Hamer, Mark; Ferrie, Jane E.; Virtanen, Marianna; Tabak, Adam G.

    2017-01-01

    Abstract Aims Studies suggest that people who work long hours are at increased risk of stroke, but the association of long working hours with atrial fibrillation, the most common cardiac arrhythmia and a risk factor for stroke, is unknown. We examined the risk of atrial fibrillation in individuals working long hours (≥55 per week) and those working standard 35–40 h/week. Methods and results In this prospective multi-cohort study from the Individual-Participant-Data Meta-analysis in Working Populations (IPD-Work) Consortium, the study population was 85 494 working men and women (mean age 43.4 years) with no recorded atrial fibrillation. Working hours were assessed at study baseline (1991–2004). Mean follow-up for incident atrial fibrillation was 10 years and cases were defined using data on electrocardiograms, hospital records, drug reimbursement registers, and death certificates. We identified 1061 new cases of atrial fibrillation (10-year cumulative incidence 12.4 per 1000). After adjustment for age, sex and socioeconomic status, individuals working long hours had a 1.4-fold increased risk of atrial fibrillation compared with those working standard hours (hazard ratio = 1.42, 95% CI = 1.13–1.80, P = 0.003). There was no significant heterogeneity between the cohort-specific effect estimates (I2 = 0%, P = 0.66) and the finding remained after excluding participants with coronary heart disease or stroke at baseline or during the follow-up (N = 2006, hazard ratio = 1.36, 95% CI = 1.05–1.76, P = 0.0180). Adjustment for potential confounding factors, such as obesity, risky alcohol use and high blood pressure, had little impact on this association. Conclusion Individuals who worked long hours were more likely to develop atrial fibrillation than those working standard hours. PMID:28911189

  7. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  8. Optimizing decentralized production-distribution planning problem in a multi-period supply chain network under uncertainty

    Science.gov (United States)

    Nourifar, Raheleh; Mahdavi, Iraj; Mahdavi-Amiri, Nezam; Paydar, Mohammad Mahdi

    2017-09-01

    Decentralized supply chain management is found to be significantly relevant in today's competitive markets. Production and distribution planning is posed as an important optimization problem in supply chain networks. Here, we propose a multi-period decentralized supply chain network model with uncertainty. The imprecision related to uncertain parameters like demand and price of the final product is appropriated with stochastic and fuzzy numbers. We provide mathematical formulation of the problem as a bi-level mixed integer linear programming model. Due to problem's convolution, a structure to solve is developed that incorporates a novel heuristic algorithm based on Kth-best algorithm, fuzzy approach and chance constraint approach. Ultimately, a numerical example is constructed and worked through to demonstrate applicability of the optimization model. A sensitivity analysis is also made.

  9. Geology of Libya Montes and the Interbasin Plains of Northern Tyrrhena Terra, Mars: Project Introduction and First Year Work Plan

    Science.gov (United States)

    Skiner, J. A., Jr.; Rogers, A. D.; Seelos, K. D.

    2009-01-01

    The highland-lowland boundary (HLB) of Mars is interpreted to be a complex tectonic and erosional transition that may hold evidence for past geologic processes and environments. The HLB-abutting margin of the Libya Montes and the interbasin plains of northern Tyrrhena Terra display an exceptional view of the earliest to middle history of Mars that has yet to be fully characterized. This region contains some of the oldest exposed materials on the Martian surface as well as aqueous mineral signatures that may be potential chemical artifacts of early highland formational processes. However, a full understanding of the regions geologic and stratigraphic evolution is remarkably lacking. Some outstanding questions regarding the geologic evolution of Libya Montes and northern Tyrrhena Terra in-clude: Does combining geomorphology and composition advance our understanding of the region s evolution? Can highland materials be subdivided into stratigraphically discrete rock and sediment sequences? What do major physiographic transitions imply about the balanced tectonism, climate change, and erosion? Where is the erosional origin and what is the post-depositional history of channel and plains units? When and in what types of environments did aqueous mineral signatures arise? This abstract introduces the geologic setting, science rationale, and first year work plan of a recently-funded 4-year geologic mapping proposal (project year = calendar year). The objective is to delineate the geologic evolution of Libya Montes and northern Tyrrhena Terra at 1:1M scale using both classical geomorphological and compositional mapping techniques. The funded quadrangles are MTMs 00282, -05282, -10282, 00277, -05277, and -10277.

  10. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    Science.gov (United States)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of

  11. Safety and health five-year plan, Fiscal years 1995--1999

    International Nuclear Information System (INIS)

    1994-10-01

    This report describes efforts by the Department of Energy (DOE) to size and allocate funding to safety and health activities that protect workers and the public from harm. Although it is well recognized that virtually every aspect of an operation has health and safety implications, this effort is directed at identifying planned efforts specifically directed at health and safety. The initial effort, to compile information for the period covering FY 1994--1998, served two primary needs: (1) to document what was actually taking place in the DOE Complex, from a budget and resource utilization standpoint (how the complex was reacting to the calls for greater protection for workers and the public); and (2) to embark on an effort to utilize forward-looking management plans to allocate resources to meet safety and health needs (to begin to be proactive). It was recognized that it would take several years to achieve full acceptance and implementation of a single, DOE-wide approach toward planning for safety and health, and to develop plans that emphasized the benefits from both risk management and accident prevention strategies. This report, describing safety and health plans and budgets for FY 1995, reflects the increasing acceptance of risk-based strategies in the development of safety and health plans. More operations are using the prioritization methodology recommended for the safety and health planning process, and more operations have begun to review planned expenditures of resources to better assure that resources are allocated to the highest risk reduction activities

  12. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    The US Department of Energy (DOE) understands that cleaning up the Nation's nuclear-related sites and facilities affects many different segments of the public, ranging from communities near DOE facilities to engineers concerned with developing new technologies to clean up the environment. In an effort to make the Environmental Restoration and Waste Management Five-Year Plan for Fiscal Years (FY) 1994--1998 more responsive to your concerns, DOE invites your comments on the plan. Volume II contains 37 Installation Summaries that provide a synopsis of past, present and future activities of each major installation, and Progress Charts

  13. The Interplay between Women's Life Course Work Patterns and Financial Planning for Later Life

    Science.gov (United States)

    Berger, Ellie D.; Denton, Margaret A.

    2004-01-01

    In order to gain a comprehensive understanding of the interplay between women's life course work patterns and their financial planning for later life, we examined data from semi-structured interviews with retired women (n = 28) aged 59 to 92. The majority of women disrupted their careers at some point in time, for an average of 14 years, primarily…

  14. Multi-morbidity, disability and adaptation strategies among community-dwelling adults aged 75 years and older.

    Science.gov (United States)

    Yuen, Hon K; Vogtle, Laura K

    2016-10-01

    The impact of multi-morbidity and disability on the use of adaptation strategies in older adults has not been well researched. This study investigated categories of adaptation strategies that community-dwelling older adults use to complete their daily activities, identified factors that are associated with the use of behavioral adaptations, and examined the relationship among multi-morbidity, disability and adaptation strategies in this population. A mixed methods research design was used. 105 community-dwelling older adults with ages ranging from 75 to 94 years completed a questionnaire and semi-structured interview on types of chronic illnesses (multi-morbidity), amount of difficulty in completing daily activities (degree of disability), and types of behavioral efforts made to complete daily activities that are challenging (adaptation strategies). The model of selective optimization with compensation (SOC) was used to categorize these strategies. The findings revealed that older adults use a wide range of adaptations with compensation and selection the most (40.4%) and least (16.5%) frequently reported respectively. Degree of disability was uniquely associated with the frequency of using SOC strategies while controlling for other factors. Furthermore, degree of disability was a mediator for multi-morbidity in predicting frequency of using SOC strategies. The findings support that older adults using behavioral adaptations to cope with functional decline is prevalent. Knowing the types of adaptation that older adults employed and the indirect relationship between multi-morbidity and frequency of using SOC strategies, with degree of disability as the mediator will be helpful in planning interventions and prevention programs for educating older adults. Copyright © 2016 Elsevier Inc. All rights reserved.

  15. Program plan, and request for reprogramming first year funds

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  16. Building a year 2000 emergency response plan

    International Nuclear Information System (INIS)

    Riopel, P.

    1998-01-01

    This presentation emphasized the importance of developing an emergency plan to minimize any impacts in the event that something may go wrong when the clock changes over at midnight on December 31, 1999. It is usually impossible to anticipate what kinds of emergencies will happen. Planning for emergencies does not have to be an intimidating task. Hazard analysis is a subjective way to investigate what can go wrong, the likelihood of it happening relative to some other potential emergency, and the seriousness of the event. In general, emergency planning for Y2K should not be significantly different from planning for any other type of emergency. Y2K is not the emergency. The events that occur as a consequence of Y2K are. It is these events that should be the focus of a Year 2000 emergency plan

  17. Inspection logistics planning for multi-stage production systems with applications to semiconductor fabrication lines

    Science.gov (United States)

    Chen, Kyle Dakai

    Since the market for semiconductor products has become more lucrative and competitive, research into improving yields for semiconductor fabrication lines has lately received a tremendous amount of attention. One of the most critical tasks in achieving such yield improvements is to plan the in-line inspection sampling efficiently so that any potential yield problems can be detected early and eliminated quickly. We formulate a multi-stage inspection planning model based on configurations in actual semiconductor fabrication lines, specifically taking into account both the capacity constraint and the congestion effects at the inspection station. We propose a new mixed First-Come-First-Serve (FCFS) and Last-Come-First-Serve (LCFS) discipline for serving the inspection samples to expedite the detection of potential yield problems. Employing this mixed FCFS and LCFS discipline, we derive approximate expressions for the queueing delays in yield problem detection time and develop near-optimal algorithms to obtain the inspection logistics planning policies. We also investigate the queueing performance with this mixed type of service discipline under different assumptions and configurations. In addition, we conduct numerical tests and generate managerial insights based on input data from actual semiconductor fabrication lines. To the best of our knowledge, this research is novel in developing, for the first time in the literature, near-optimal results for inspection logistics planning in multi-stage production systems with congestion effects explicitly considered.

  18. Individualism-Collectivism: Links to Occupational Plans and Work Values

    Science.gov (United States)

    Hartung, Paul J.; Fouad, Nadya A.; Leong, Frederick T. L.; Hardin, Erin E.

    2010-01-01

    Individualism-collectivism (IC) constitutes a cultural variable thought to influence a wide variety of variables including career planning and decision making. To examine this possibility, college students (216 women, 106 men, 64% racial-ethnic minorities) responded to measures of IC, occupational plans, and work values. Multivariate analysis of…

  19. Planning Decrements in Healthy Aging: Mediation Effects of Fluid Reasoning and Working Memory Capacity.

    Science.gov (United States)

    Köstering, Lena; Leonhart, Rainer; Stahl, Christoph; Weiller, Cornelius; Kaller, Christoph P

    2016-03-01

    Although age-related differences in planning ability are well known, their cognitive foundations remain a matter of contention. To elucidate the specific processes underlying planning decrements in older age, the relative contributions of fluid reasoning, working memory (WM) capacity, and processing speed to accuracy on the Tower of London (TOL) planning task were investigated. Mediation analyses were used to relate overall and search depth-related TOL accuracy from older (N = 106; 60-89 years) and younger adults (N = 69; 18-54 years) to age and measures of fluid reasoning, WM capacity, and speed. For overall planning, fluid abilities mediated the effects of age, WM capacity, and speed in older adults. By contrast, fluid abilities and WM capacity mediated each other in younger adults. For planning accuracy under low demands on the depth of search, WM capacity was specifically important in older age, whereas younger adults recruited both WM capacity and fluid reasoning. Under high search-depth-demands, fluid abilities underlay the cognitive operations critical for resolving move interdependencies in both age groups. Fluid abilities and WM capacity undergo significant changes from younger to older age in their unique contribution to planning, which might represent a mechanism whereby planning decrements in older age are brought about. © The Author 2014. Published by Oxford University Press on behalf of The Gerontological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  20. SU-F-T-312: Identifying Distinct Radiation Therapy Plan Classes Through Multi-Dimensional Analysis of Plan Complexity Metrics

    Energy Technology Data Exchange (ETDEWEB)

    Desai, V; Labby, Z; Culberson, W [University of Wisc Madison, Madison, WI (United States)

    2016-06-15

    Purpose: To determine whether body site-specific treatment plans form unique “plan class” clusters in a multi-dimensional analysis of plan complexity metrics such that a single beam quality correction determined for a representative plan could be universally applied within the “plan class”, thereby increasing the dosimetric accuracy of a detector’s response within a subset of similarly modulated nonstandard deliveries. Methods: We collected 95 clinical volumetric modulated arc therapy (VMAT) plans from four body sites (brain, lung, prostate, and spine). The lung data was further subdivided into SBRT and non-SBRT data for a total of five plan classes. For each control point in each plan, a variety of aperture-based complexity metrics were calculated and stored as unique characteristics of each patient plan. A multiple comparison of means analysis was performed such that every plan class was compared to every other plan class for every complexity metric in order to determine which groups could be considered different from one another. Statistical significance was assessed after correcting for multiple hypothesis testing. Results: Six out of a possible 10 pairwise plan class comparisons were uniquely distinguished based on at least nine out of 14 of the proposed metrics (Brain/Lung, Brain/SBRT lung, Lung/Prostate, Lung/SBRT Lung, Lung/Spine, Prostate/SBRT Lung). Eight out of 14 of the complexity metrics could distinguish at least six out of the possible 10 pairwise plan class comparisons. Conclusion: Aperture-based complexity metrics could prove to be useful tools to quantitatively describe a distinct class of treatment plans. Certain plan-averaged complexity metrics could be considered unique characteristics of a particular plan. A new approach to generating plan-class specific reference (pcsr) fields could be established through a targeted preservation of select complexity metrics or a clustering algorithm that identifies plans exhibiting similar

  1. Post Irradiation Examination Plan for High-Burnup Demonstration Project Sister Rods

    Energy Technology Data Exchange (ETDEWEB)

    Scaglione, John M [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Montgomery, Rose [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevard, Bruce Balkcom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-04-01

    This test plan describes the experimental work to be implemented by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) to characterize high burnup (HBU) spent nuclear fuel (SNF) in conjunction with the High Burnup Dry Storage Cask Research and Development Project and serves to coordinate and integrate the multi-year experimental program to collect and develop data regarding the continued storage and eventual transport of HBU (i.e., >45 GWd/MTU) SNF. The work scope involves the development, performance, technical integration, and oversight of measurements and collection of relevant data, guided by analyses and demonstration of need.

  2. Playing Multi-Action Adversarial Games: Online Evolutionary Planning versus Tree Search

    OpenAIRE

    Justesen, Niels; Mahlmann, Tobias; Risi, Sebastian; Togelius, Julian

    2017-01-01

    We address the problem of playing turn-based multi-action adversarial games, which include many strategy games with extremely high branching factors as players take multiple actions each turn. This leads to the breakdown of standard tree search methods, including Monte Carlo Tree Search (MCTS), as they become unable to reach a sufficient depth in the game tree. In this paper, we introduce Online Evolutionary Planning (OEP) to address this challenge, which searches for combinations of actions ...

  3. Study on optimization of normal plant outage work plan for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo

    2011-01-01

    This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)

  4. A multi-objective framework for dynamic transmission expansion planning in competitive electricity market

    International Nuclear Information System (INIS)

    Foroud, Asghar Akbari; Abdoos, Ali Akbar; Keypour, Reza; Amirahmadi, Meisam

    2010-01-01

    Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the feasibility and capabilities of the proposed algorithm in electricity market environment. (author)

  5. The equivalence of multi-criteria methods for radiotherapy plan optimization

    International Nuclear Information System (INIS)

    Breedveld, Sebastiaan; Storchi, Pascal R M; Heijmen, Ben J M

    2009-01-01

    Several methods can be used to achieve multi-criteria optimization of radiation therapy treatment planning, which strive for Pareto-optimality. The property of the solution being Pareto optimal is desired, because it guarantees that no criteria can be improved without deteriorating another criteria. The most widely used methods are the weighted-sum method, in which the different treatment objectives are weighted, and constrained optimization methods, in which treatment goals are set and the algorithm has to find the best plan fulfilling these goals. The constrained method used in this paper, the 2pεc (2-phase ε-constraint) method is based on the ε-constraint method, which generates Pareto-optimal solutions. Both approaches are uniquely related to each other. In this paper, we will show that it is possible to switch from the constrained method to the weighted-sum method by using the Lagrange multipliers from the constrained optimization problem, and vice versa by setting the appropriate constraints. In general, the theory presented in this paper can be useful in cases where a new situation is slightly different from the original situation, e.g. in online treatment planning, with deformations of the volumes of interest, or in automated treatment planning, where changes to the automated plan have to be made. An example of the latter is given where the planner is not satisfied with the result from the constrained method and wishes to decrease the dose in a structure. By using the Lagrange multipliers, a weighted-sum optimization problem is constructed, which generates a Pareto-optimal solution in the neighbourhood of the original plan, but fulfills the new treatment objectives.

  6. SU-F-T-613: Multi-Lesion Cranial SRS VMAT Plan Quality

    Energy Technology Data Exchange (ETDEWEB)

    Ballangrud, A; Kuo, L; Happersett, L; Lim, S; Li, X; Beal, K; Yamada, Y; LoSasso, T; Mechalakos, J [Memorial Sloan-Kettering Cancer Center, New York, NY (United States)

    2016-06-15

    Purpose: Cranial SRS VMAT plans must have steep dose gradient around each target to reduce dose to normal brain. This study reports on the correlation between gradient index (GI=V50%/V100%), target size and target dose heterogeneity index (HI=PTV Dmax/prescription dose) for multi-lesion cranial SRS VMAT plans. Methods: VMAT plans for 10 cranial cases with 3 to 6 lesions (total 39 lesions) generated in Varian Eclipse V11.0.47 with a fine-tuned AAA beam model and 0.125 cm dose grid were analyzed. One or two iso centers were used depending on the spatial distribution of lesions. Two to nine coplanar and non-coplanar arcs were used per isocenter. Conformity index (CI= V100%/VPTV), HI, and GI were determined for each lesion. Dose to critical structures were recorded. Results: Lesion size ranged from 0.05–11.00 cm3. HI ranged from 1.2–1.4, CI ranged from 1.0–2.8 and GI from 3.1–8.4. Maximum dose to brainstem, chiasm, lenses, optic nerves and eyes ranged from 120–1946 cGy, 47–463 cGy, 9–121 cGy, 14–512 cGy, and 17–294 cGy, respectively. Brain minus PTV (Brain-PTV) V7Gy was in the range 1.1–6.5%, and Brain-PTV Dmean was in the range 94–324 cGy. Conclusion: This work shows that a GI < 5 can be achieved for lesions > 0.4cc. For smaller lesions, GI increases rapidly. GI is lower when HI is increased. Based on this study, recommend HI is 1.4, and recommended GI is for volumes <0.1cc GI<9, 0.1–0.4cc GI<6, 0.4–0.1.0cc GI<5, and for volumes >1.0cc GI<4. CI is < 1.3 for all lesions except for targets < 0.1cc. Cranial SRS VMAT plans must be optimized to lower the GI to reduce the dose to normal brain tissue.

  7. Transportation and packaging headquarters support 1997 multi-year work plan WBS 8.1

    International Nuclear Information System (INIS)

    Chapman, T.J.

    1996-01-01

    To develop and implement baseline and state-of-the-art transportation and packaging resources for DOE, and its support contractors. These resources include effective strategies, tools and techniques, packaging and transportation systems, operational methods, policy and guidance focused at providing safety,efficient, regulatory compliant and cost-effective materials transportation

  8. Site Outcomes Baseline Multi Year Work Plan Volume 1, River Corridor Restoration Baseline

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The River Corridor Restoration volume is a compilation of Hanford Site scope, which excludes the approximately 194 km 2 Central Plateau. The River Corridor scope is currently contractually assigned to Fluor Hanford, Bechtel Hanford, inc., DynCorp, and Pacific Northwest National Laboratory, and others. The purpose of this project specification is to provide an overall scoping document for the River Corridor Restoration volume, and to provide a link with the overall Hanford Site River Corridor scope. Additionally, this specification provides an integrated and consolidated source of information for the various scopes, by current contract, for the River Corridor Restoration Baseline. It identifies the vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards

  9. The Dynamic Multi-Period Vehicle Routing Problem

    DEFF Research Database (Denmark)

    Wen, Min; Cordeau, Jean-Francois; Laporte, Gilbert

    This paper considers the Dynamic Multi-Period Vehicle Routing Problem which deals with the distribution of orders from a depot to a set of customers over a multi-period time horizon. Customer orders and their feasible service periods are dynamically revealed over time. The objectives are to minim......This paper considers the Dynamic Multi-Period Vehicle Routing Problem which deals with the distribution of orders from a depot to a set of customers over a multi-period time horizon. Customer orders and their feasible service periods are dynamically revealed over time. The objectives...... are to minimize total travel costs and customer waiting, and to balance the daily workload over the planning horizon. This problem originates from a large distributor operating in Sweden. It is modeled as a mixed integer linear program, and solved by means of a three-phase heuristic that works over a rolling...... planning horizon. The multi-objective aspect of the problem is handled through a scalar technique approach. Computational results show that our solutions improve upon those of the Swedish distributor....

  10. Energy-water analysis of the 10-year WECC transmission planning study cases.

    Energy Technology Data Exchange (ETDEWEB)

    Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

    2011-11-01

    modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

  11. Interprofessional education for first year psychology students: career plans, perceived relevance and attitudes.

    Science.gov (United States)

    Roberts, Lynne D; Forman, Dawn

    2015-05-01

    Undergraduate psychology students have been largely excluded from interprofessional education (IPE) initiatives. In contrast to many health professions, undergraduate psychology students do not engage in work placements as part of their degree, and many enter careers outside the health care context. However, the collaborative skills gained through an IPE experience may well be beneficial to students who work in this wider context. This research examines whether undergraduate psychology students' views of IPE vary according to their planned career directions, and if so, whether the perceived relevance of IPE mediates the relationships. A sample of 188 Australian university undergraduate psychology students completed an online questionnaire following completion of a first-year IPE health sciences program. Path analysis indicated that psychology students' attitudes towards IPE are associated with both professional identification and practitioner orientation, fully mediated through the perceived relevance of IPE to future career and study plans. Stronger professional identification and practitioner orientation were associated with greater perceived relevance and more positive and less negative attitudes towards IPE. Placing a stronger emphasis on the generalizability of IP skills taught may increase students' awareness of the relevance outside of the health context, reducing disengagement of students planning alternative careers.

  12. College of New Caledonia Three Year Plan, 1991-1994.

    Science.gov (United States)

    Seens, Paul

    In 1991, the College of New Caledonia (CNC) (British Columbia, Canada) prepared this 3-year plan representing the college's vision of the future as it attempts to meet the educational needs of the region. Identifying key opportunities open to CNC, this nine-part plan describes CNC's mission, goals, plans, and objectives. Section I provides an…

  13. An observation planning algorithm applied to multi-objective astronomical observations and its simulation in COSMOS field

    Science.gov (United States)

    Jin, Yi; Gu, Yonggang; Zhai, Chao

    2012-09-01

    Multi-Object Fiber Spectroscopic sky surveys are now booming, such as LAMOST already built by China, BIGBOSS project put forward by the U.S. Lawrence Berkeley National Lab and GTC (Gran Telescopio Canarias) telescope developed by the United States, Mexico and Spain. They all use or will use this approach and each fiber can be moved within a certain area for one astrology target, so observation planning is particularly important for this Sky Surveys. One observation planning algorithm used in multi-objective astronomical observations is developed. It can avoid the collision and interference between the fiber positioning units in the focal plane during the observation in one field of view, and the interested objects can be ovserved in a limited round with the maximize efficiency. Also, the observation simulation can be made for wide field of view through multi-FOV observation. After the observation planning is built ,the simulation is made in COSMOS field using GTC telescope. Interested galaxies, stars and high-redshift LBG galaxies are selected after the removal of the mask area, which may be bright stars. Then 9 FOV simulation is completed and observation efficiency and fiber utilization ratio for every round are given. Otherwise,allocating a certain number of fibers for background sky, giving different weights for different objects and how to move the FOV to improve the overall observation efficiency are discussed.

  14. A survey of the family planning work done in Dongguan County.

    Science.gov (United States)

    Wang, L; Hu, F; Liu, F

    1985-08-01

    The total fertility rate of women of childbearing age of Dongguan County in China has been decreasing gradually from 5.9 during the period following the liberation in 1949 to 2.05 in 1982. In order to encourage young couples to implement the policy of family planning consciously, the people's government of Dongguan county decided in July 1980 that all cadres and employees in county towns who received 1-child certificates would be exempted from house rent of 45 square meters from the time they get their certificates and would be allocated a living space of a 2-children family until their children reached age 16. It also stipulated that every couple could enjoy 1 month's holiday every year for 3 years and during the holiday, their salary, bonus and rate of attendance would not be affected. Because women bear less children today, they are relieved from heavy household chores and become the main working force in collective production. As a result, the development of town-run enterprises was stimulated and the total industrial output value of these enterprises increased. The average monthly salary of each female worker is about 100 yuan. In 1984, the average income per capita of the country rose to 649.2 yuan. The implementation of family planning work has eased the tension in the education field. Previously, because of the large number of school-age children in rural areas, teachers had to teach 2 classes. In the past 4 years, great emphasis was laid on intellectual investment. During this period, 2351 schools were built and several fundraising projects were implemented. Since 1981, more than 200 new running water projects were built, and new public services have been developed, including old age homes.

  15. SU-G-JeP2-02: A Unifying Multi-Atlas Approach to Electron Density Mapping Using Multi-Parametric MRI for Radiation Treatment Planning

    Energy Technology Data Exchange (ETDEWEB)

    Ren, S [Stanford University, Stanford, CA (United States); Tianjin University, Tianjin (China); Hara, W; Le, Q; Wang, L; Xing, L; Li, R [Stanford University, Stanford, CA (United States)

    2016-06-15

    Purpose: MRI has a number of advantages over CT as a primary modality for radiation treatment planning (RTP). However, one key bottleneck problem still remains, which is the lack of electron density information in MRI. In the work, a reliable method to map electron density is developed by leveraging the differential contrast of multi-parametric MRI. Methods: We propose a probabilistic Bayesian approach for electron density mapping based on T1 and T2-weighted MRI, using multiple patients as atlases. For each voxel, we compute two conditional probabilities: (1) electron density given its image intensity on T1 and T2-weighted MR images, and (2) electron density given its geometric location in a reference anatomy. The two sources of information (image intensity and spatial location) are combined into a unifying posterior probability density function using the Bayesian formalism. The mean value of the posterior probability density function provides the estimated electron density. Results: We evaluated the method on 10 head and neck patients and performed leave-one-out cross validation (9 patients as atlases and remaining 1 as test). The proposed method significantly reduced the errors in electron density estimation, with a mean absolute HU error of 138, compared with 193 for the T1-weighted intensity approach and 261 without density correction. For bone detection (HU>200), the proposed method had an accuracy of 84% and a sensitivity of 73% at specificity of 90% (AUC = 87%). In comparison, the AUC for bone detection is 73% and 50% using the intensity approach and without density correction, respectively. Conclusion: The proposed unifying method provides accurate electron density estimation and bone detection based on multi-parametric MRI of the head with highly heterogeneous anatomy. This could allow for accurate dose calculation and reference image generation for patient setup in MRI-based radiation treatment planning.

  16. SU-G-JeP2-02: A Unifying Multi-Atlas Approach to Electron Density Mapping Using Multi-Parametric MRI for Radiation Treatment Planning

    International Nuclear Information System (INIS)

    Ren, S; Hara, W; Le, Q; Wang, L; Xing, L; Li, R

    2016-01-01

    Purpose: MRI has a number of advantages over CT as a primary modality for radiation treatment planning (RTP). However, one key bottleneck problem still remains, which is the lack of electron density information in MRI. In the work, a reliable method to map electron density is developed by leveraging the differential contrast of multi-parametric MRI. Methods: We propose a probabilistic Bayesian approach for electron density mapping based on T1 and T2-weighted MRI, using multiple patients as atlases. For each voxel, we compute two conditional probabilities: (1) electron density given its image intensity on T1 and T2-weighted MR images, and (2) electron density given its geometric location in a reference anatomy. The two sources of information (image intensity and spatial location) are combined into a unifying posterior probability density function using the Bayesian formalism. The mean value of the posterior probability density function provides the estimated electron density. Results: We evaluated the method on 10 head and neck patients and performed leave-one-out cross validation (9 patients as atlases and remaining 1 as test). The proposed method significantly reduced the errors in electron density estimation, with a mean absolute HU error of 138, compared with 193 for the T1-weighted intensity approach and 261 without density correction. For bone detection (HU>200), the proposed method had an accuracy of 84% and a sensitivity of 73% at specificity of 90% (AUC = 87%). In comparison, the AUC for bone detection is 73% and 50% using the intensity approach and without density correction, respectively. Conclusion: The proposed unifying method provides accurate electron density estimation and bone detection based on multi-parametric MRI of the head with highly heterogeneous anatomy. This could allow for accurate dose calculation and reference image generation for patient setup in MRI-based radiation treatment planning.

  17. A multi-attribute preference model for optimal irrigated crop planning under water scarcity conditions

    Energy Technology Data Exchange (ETDEWEB)

    Montazar, A.; Snyder, R. L.

    2012-11-01

    Water resources sustainability has a key role in the existence and durability of irrigated farming systems and strongly depends on the crop planning. The decision process is complex due to a number of constraints and the desire to secure crop diversification and the involvement of affected various parameters. The objective of the present study was to develop a comprehensive multi-criteria model for selecting adequate cropping pattern in an irrigation district under water scarcity condition. Eleven and nine attribute decisions were considered in ranking the type of crop and determination of the percentage of crop cultivation area as an optimal irrigated crop planning system, respectively. The results indicate that the proposed multi-attribute preference approach can synthesize various sets of criteria in the preference elicitation of the crop type and cultivated area. The predictive validity analysis shows that the preferences acquired by the proposed model are evidently in reasonable accordance with those of the conjunctive water use model. Consequently, the model may be used to aggregate preferences in order to obtain a group decision, improve understanding of the choice problem, accommodate multiple objectives and increase transparency and credibility in decision making by actively involving relevant criteria in the crop planning. (Author) 27 refs.

  18. The Role of Working Memory in Planning and Generating Written Sentences

    Directory of Open Access Journals (Sweden)

    Ronald T. Kellogg

    2016-02-01

    Full Text Available Planning a sentence with concrete concepts whose referents can be mentally imaged has been shown in past work to require the limited resources of visual working memory. By contrast, grammatically encoding such concepts as lexical items in a syntactic structure requires verbal working memory. We report an experiment designed to demonstrate a double dissociation of these two stores of working memory by manipulating the difficulty of (1 planning by comparing related concepts to unrelated concepts and (2 grammatical encoding of an English sentence in active voice versus the more complex structure of the passive voice. College students (N = 46 composed sentences that were to include two noun prompts (related versus unrelated while concurrently performing either a visual or a verbal distracting task. Instructions to produce either active or passive sentences were manipulated between groups. The results surprisingly indicated that the supposedly easier planning with related concepts made a large demand on verbal working memory, rather than unrelated concepts demanding more visual working memory. The temporal dynamics of the sentence production process appear to best account for the unexpected findings.

  19. 78 FR 26616 - Draft NOAA Five Year Research and Development Plan

    Science.gov (United States)

    2013-05-07

    ... DEPARTMENT OF COMMERCE Draft NOAA Five Year Research and Development Plan AGENCY: National Oceanic and Atmospheric Administration (NOAA), Department of Commerce (DOC). ACTION: Draft NOAA Five Year Research and Development Plan for Public Review. SUMMARY: NOAA's draft Five Year Research and Development...

  20. Multi-objective optimization and exergetic-sustainability of an irreversible nano scale Braysson cycle operating with Ma

    Directory of Open Access Journals (Sweden)

    Mohammad H. Ahmadi

    2016-06-01

    Full Text Available Nano technology is developed in this decade and changes the way of life. Moreover, developing nano technology has effect on the performance of the materials and consequently improves the efficiency and robustness of them. So, nano scale thermal cycles will be probably engaged in the near future. In this paper, a nano scale irreversible Braysson cycle is studied thermodynamically for optimizing the performance of the Braysson cycle. In the aforementioned cycle an ideal Maxwell–Boltzmann gas is used as a working fluid. Furthermore, three different plans are used for optimizing with multi-objectives; though, the outputs of the abovementioned plans are assessed autonomously. Throughout the first plan, with the purpose of maximizing the ecological coefficient of performance and energy efficiency of the system, multi-objective optimization algorithms are used. Furthermore, in the second plan, two objective functions containing the ecological coefficient of performance and the dimensionless Maximum available work are maximized synchronously by utilizing multi-objective optimization approach. Finally, throughout the third plan, three objective functions involving the dimensionless Maximum available work, the ecological coefficient of performance and energy efficiency of the system are maximized synchronously by utilizing multi-objective optimization approach. The multi-objective evolutionary approach based on the non-dominated sorting genetic algorithm approach is used in this research. Making a decision is performed by three different decision makers comprising linear programming approaches for multidimensional analysis of preference and an approach for order of preference by comparison with ideal answer and Bellman–Zadeh. Lastly, analysis of error is employed to determine deviation of the outcomes gained from each plan.

  1. Playing Multi-Action Adversarial Games: Online Evolutionary Planning versus Tree Search

    DEFF Research Database (Denmark)

    Justesen, Niels; Mahlmann, Tobias; Risi, Sebastian

    2017-01-01

    We address the problem of playing turn-based multi-action adversarial games, which include many strategy games with extremely high branching factors as players take multiple actions each turn. This leads to the breakdown of standard tree search methods, including Monte Carlo Tree Search (MCTS......), as they become unable to reach a sufficient depth in the game tree. In this paper, we introduce Online Evolutionary Planning (OEP) to address this challenge, which searches for combinations of actions to perform during a single turn guided by a fitness function that evaluates the quality of a particular state....... We compare OEP to different MCTS variations that constrain the exploration to deal with the high branching factor in the turn-based multi-action game Hero Academy. While the constrained MCTS variations outperform the vanilla MCTS implementation by a large margin, OEP is able to search the space...

  2. Description of work (performed over the last three years)

    International Nuclear Information System (INIS)

    San Luis, Teofilo O.L. Jr.

    2001-01-01

    Full text: In the University of Santo Tomas, Faculty of Medicine and Surgery, I give scheduled lectures to 3rd and 4th year medical students in Nuclear Medicine (NM) and Thyroidology; attend grand rounds and conferences; and participate in planning other academic work like post-graduate courses and scientific meetings. In the University Hospital I read out NM imaging procedures (scans) and supervise assay work by the technical staff. I also supervise the training of NM residents and coordinating research works involving in-vivo and in-vitro procedures done by our residents and fellows. I see patients (both private and service/teaching) and administer radioactive therapy as indicated. As Assistant Medical Director for Development (1998-2001) I sit in the Executive Management Committee and direct the strategic planning and development particularly of the medical infrastructure and instrumentation of the hospital, and manage the publication of the hospital newsletter. In the St. Luke's Medical Carter, Department of Nuclear Medicine (starting September 2000) I exercise general administrative supervision and control over all imaging and non-imaging procedures, other diagnostic and therapeutic applications of radionuclides in patient care and research. I review clinical reports, conduct conferences for medical and technical staff, and supervise the NM training program (initially for residents, later for fellows) which I initiated and is now being implemented starting January 2001. As the Department is establishing a PET and Cyclotron facility (the first of its kind in the Philippines), we have had some discussions on the infrastructural, organizational and operational aspects, including the human resource development of the medical and technical staff. (author)

  3. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium- 99 T c -Nitrate multi-contaminant IRM plume identified beneath U Plant

  4. Path planning of decentralized multi-quadrotor based on fuzzy-cell decomposition algorithm

    Science.gov (United States)

    Iswanto, Wahyunggoro, Oyas; Cahyadi, Adha Imam

    2017-04-01

    The paper aims to present a design algorithm for multi quadrotor lanes in order to move towards the goal quickly and avoid obstacles in an area with obstacles. There are several problems in path planning including how to get to the goal position quickly and avoid static and dynamic obstacles. To overcome the problem, therefore, the paper presents fuzzy logic algorithm and fuzzy cell decomposition algorithm. Fuzzy logic algorithm is one of the artificial intelligence algorithms which can be applied to robot path planning that is able to detect static and dynamic obstacles. Cell decomposition algorithm is an algorithm of graph theory used to make a robot path map. By using the two algorithms the robot is able to get to the goal position and avoid obstacles but it takes a considerable time because they are able to find the shortest path. Therefore, this paper describes a modification of the algorithms by adding a potential field algorithm used to provide weight values on the map applied for each quadrotor by using decentralized controlled, so that the quadrotor is able to move to the goal position quickly by finding the shortest path. The simulations conducted have shown that multi-quadrotor can avoid various obstacles and find the shortest path by using the proposed algorithms.

  5. The impact of completing upper secondary education - a multi-state model for work, education and health in young men.

    Science.gov (United States)

    Hoff, Rune; Corbett, Karina; Mehlum, Ingrid S; Mohn, Ferdinand A; Kristensen, Petter; Hanvold, Therese N; Gran, Jon M

    2018-04-27

    Completing upper secondary education is associated with higher work participation and less health-related absence from work. Although these outcomes are closely interrelated, most studies focus on single outcomes, using cross-sectional designs or short follow-up periods. As such, there is limited knowledge of the long-term outcomes, and how paths for completers and non-completers unfold over time. In this paper, we use multi-state models for time-to-event data to assess the long-term effects of completing upper secondary education on employment, tertiary education, sick leave, and disability pension over twelve and a half years for young men. Baseline covariates and twelve and a half years of follow-up data on employment, tertiary education, sick leave and disability pension were obtained from national registries for all males born in Norway between 1971 and 1976 (n =184951). The effects of completing upper secondary education (by age 23) were analysed in a multi-state framework, adjusting for both individual and family level confounders. All analyses were done separately for general studies and vocational tracks. Completers do better on a range of outcomes compared to non-completers, for both fields of upper secondary education, but effects of completion change over time. The largest changes are for tertiary education and work, with the probability of work increasing reciprocally to the probability of education. Vocational students are quicker to transfer to the labour market, but tend to have more unemployment, sick leave and disability, and the absolute effects of completion on these outcomes are largest for vocational tracks. However, the relative effects of completion are larger for general studies. Completing upper secondary education increases long-term work participation and lowers health-related absence for young men, but effects diminish over time. Studies that have used shorter follow-up periods could be overstating the negative effects of dropout on

  6. Long working hours as a risk factor for atrial fibrillation: a multi-cohort study.

    Science.gov (United States)

    Kivimäki, Mika; Nyberg, Solja T; Batty, G David; Kawachi, Ichiro; Jokela, Markus; Alfredsson, Lars; Bjorner, Jakob B; Borritz, Marianne; Burr, Hermann; Dragano, Nico; Fransson, Eleonor I; Heikkilä, Katriina; Knutsson, Anders; Koskenvuo, Markku; Kumari, Meena; Madsen, Ida E H; Nielsen, Martin L; Nordin, Maria; Oksanen, Tuula; Pejtersen, Jan H; Pentti, Jaana; Rugulies, Reiner; Salo, Paula; Shipley, Martin J; Suominen, Sakari; Theorell, Töres; Vahtera, Jussi; Westerholm, Peter; Westerlund, Hugo; Steptoe, Andrew; Singh-Manoux, Archana; Hamer, Mark; Ferrie, Jane E; Virtanen, Marianna; Tabak, Adam G

    2017-09-07

    Studies suggest that people who work long hours are at increased risk of stroke, but the association of long working hours with atrial fibrillation, the most common cardiac arrhythmia and a risk factor for stroke, is unknown. We examined the risk of atrial fibrillation in individuals working long hours (≥55 per week) and those working standard 35-40 h/week. In this prospective multi-cohort study from the Individual-Participant-Data Meta-analysis in Working Populations (IPD-Work) Consortium, the study population was 85 494 working men and women (mean age 43.4 years) with no recorded atrial fibrillation. Working hours were assessed at study baseline (1991-2004). Mean follow-up for incident atrial fibrillation was 10 years and cases were defined using data on electrocardiograms, hospital records, drug reimbursement registers, and death certificates. We identified 1061 new cases of atrial fibrillation (10-year cumulative incidence 12.4 per 1000). After adjustment for age, sex and socioeconomic status, individuals working long hours had a 1.4-fold increased risk of atrial fibrillation compared with those working standard hours (hazard ratio = 1.42, 95% CI = 1.13-1.80, P = 0.003). There was no significant heterogeneity between the cohort-specific effect estimates (I2 = 0%, P = 0.66) and the finding remained after excluding participants with coronary heart disease or stroke at baseline or during the follow-up (N = 2006, hazard ratio = 1.36, 95% CI = 1.05-1.76, P = 0.0180). Adjustment for potential confounding factors, such as obesity, risky alcohol use and high blood pressure, had little impact on this association. Individuals who worked long hours were more likely to develop atrial fibrillation than those working standard hours. © The Author 2017. Published by Oxford University Press on behalf of the European Society of Cardiology.

  7. Fuzzy bicriteria multi-index transportation problems for coal allocation planning of Taipower

    International Nuclear Information System (INIS)

    Tzeng, G.-H.; Teodorvic, D.; Hwang, M.-J.

    1996-01-01

    Taipower, the official electricity authority of Taiwan, encounters several difficulties in planning annual coal purchase and allocation schedule, e.g. with multiple sources, multiple destinations, multiple coal types, different shipping vessels, and even an uncertain demand and supply. In this study, these concerns are formulated as a fuzzy bicriteria multi-index transportation problem. Furthermore, an effective and interactive algorithm is proposed which combines reducing index method and interactive fuzzy multi-objective linear programming technique to cope with a complicated problem which may be prevalent in other industries. Results obtained in this study clearly demonstrate that this model can not only satisfy more of the actual requirements of the integral system but also offer more information to the decision makers (DMs) for reference in favor of exalting decision making quality. 34 refs., 4 figs., 4 tabs

  8. Multi-day activity scheduling reactions to planned activities and future events in a dynamic model of activity-travel behavior

    NARCIS (Netherlands)

    Nijland, L.; Arentze, T.A.; Timmermans, H.J.P.

    2014-01-01

    Modeling multi-day planning has received scarce attention in activity-based transport demand modeling so far. However, new dynamic activity-based approaches are being developed at the current moment. The frequency and inflexibility of planned activities and events in activity schedules of

  9. Multi-Day Activity Scheduling Reactions to Planned Activities and Future Events in a Dynamic Model of Activity-Travel Behavior

    NARCIS (Netherlands)

    Nijland, L.; Arentze, T.; Timmermans, H.

    2014-01-01

    Modeling multi-day planning has received scarce attention in activity-based transport demand modeling so far. However, new dynamic activity-based approaches are being developed at the current moment. The frequency and inflexibility of planned activities and events in activity schedules of

  10. Multi-objective optimal planning of the stand-alone microgrid system based on different benefit subjects

    International Nuclear Information System (INIS)

    Guo, Li; Wang, Nan; Lu, Hai; Li, Xialin; Wang, Chengshan

    2016-01-01

    As an important means to realize the energetic complementarity and improve the efficiency of renewable resources, the stand-alone microgrid (SAMG) system gains attention increasingly, especially in islands and remote areas. In this paper, considering the interest conflict of the distribution company and the distributed generation owner, a new multi-objective optimal planning model is formulated for medium voltage SAMG. Besides, to avoid the power constraint of distributed generation (DG) once the over-limit voltage occurs, a novel two-step power dispatch control method including the voltage regulation strategy is proposed, in which the absorption of distributed power by energy storage system (ESS) and the reactive power adjustment though its power control system are used to regulate voltage. The goal of this paper is to search the Pareto-optimal front of the site and capacity of DG as well as the contract price between both parties, and thus can provide effective references for practical planning of SAMG. Considering the high cost of ESS, the investment analysis of ESS is also discussed in the paper. - Highlights: • A multi-objective planning model based on different benefit subjects is proposed. • A two-step power dispatch method including the voltage regulation is proposed. • The economical efficiency of the proposed model is analyzed. • The effective reference for the stand-alone microgrid planning is provided.

  11. Louisiana Airport System Plan Five-Year Capital Improvement Program.

    Science.gov (United States)

    1992-07-01

    The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...

  12. Evaluation of Crew-Centric Onboard Mission Operations Planning and Execution Tool: Year 2

    Science.gov (United States)

    Hillenius, S.; Marquez, J.; Korth, D.; Rosenbaum, M.; Deliz, Ivy; Kanefsky, Bob; Zheng, Jimin

    2018-01-01

    Currently, mission planning for the International Space Station (ISS) is largely affected by ground operators in mission control. The task of creating a week-long mission plan for ISS crew takes dozens of people multiple days to complete, and is often created far in advance of its execution. As such, re-planning or adapting to changing real-time constraints or emergent issues is similarly taxing. As we design for future mission operations concepts to other planets or areas with limited connectivity to Earth, more of these ground-based tasks will need to be handled autonomously by the crew onboard.There is a need for a highly usable (including low training time) tool that enables efficient self-scheduling and execution within a single package. The ISS Program has identified Playbook as a potential option. It already has high crew acceptance as a plan viewer from previous analogs and can now support a crew self-scheduling assessment on ISS or on another mission. The goals of this work, a collaboration between the Human Research Program and the ISS Program, are to inform the design of systems for more autonomous crew operations and provide a platform for research on crew autonomy for future deep space missions. Our second year of the research effort have included new insights on the crew self-scheduling sessions performed by the crew through use on the HERA (Human Exploration Research Analog) and NEEMO (NASA Extreme Environment Mission Operations) analogs. Use on the NEEMO analog involved two self-scheduling strategies where the crew planned and executed two days of EVAs (Extra-Vehicular Activities). On HERA year two represented the first HERA campaign where we were able to perform research tasks. This involved selected flexible activities that the crew could schedule, mock timelines where the crew completed more complex planning exercises, usability evaluation of the crew self-scheduling features, and more insights into the limit of plan complexity that the crew

  13. A Multi-touch Tool for Co-creation

    Science.gov (United States)

    Ludden, Geke D. S.; Broens, Tom

    Multi-touch technology provides an attractive way for knowledge workers to collaborate. Co-creation is an important collaboration process in which collecting resources, creating results and distributing these results is essential. We propose a wall-based multi-touch system (called CoCreate) in which these steps are made easy due to the notion of connected private spaces and a shared co-create space. We present our ongoing work, expert evaluation of interaction scenarios and future plans.

  14. A multi-objective multi-memetic algorithm for network-wide conflict-free 4D flight trajectories planning

    Institute of Scientific and Technical Information of China (English)

    Su YAN; Kaiquan CAI

    2017-01-01

    Under the demand of strategic air traffic flow management and the concept of trajectory based operations (TBO),the network-wide 4D flight trajectories planning (N4DFTP) problem has been investigated with the purpose of safely and efficiently allocating 4D trajectories (4DTs) (3D position and time) for all the flights in the whole airway network.Considering that the introduction of large-scale 4DTs inevitably increases the problem complexity,an efficient model for strategic level conflict management is developed in this paper.Specifically,a bi-objective N4DFTP problem that aims to minimize both potential conflicts and the trajectory cost is formulated.In consideration of the large-scale,high-complexity,and multi-objective characteristics of the N4DFTP problem,a multi-objective multi-memetic algorithm (MOMMA) that incorporates an evolutionary global search framework together with three problem-specific local search operators is implemented.It is capable of rapidly and effectively allocating 4DTs via rerouting,target time controlling,and flight level changing.Additionally,to balance the ability of exploitation and exploration of the algorithm,a special hybridization scheme is adopted for the integration of local and global search.Empirical studies using real air traffic data in China with different network complexities show that the pro posed MOMMA is effective to solve the N4DFTP problem.The solutions achieved are competitive for elaborate decision support under a TBO environment.

  15. A multi-objective multi-memetic algorithm for network-wide conflict-free 4D flight trajectories planning

    Directory of Open Access Journals (Sweden)

    Su YAN

    2017-06-01

    Full Text Available Under the demand of strategic air traffic flow management and the concept of trajectory based operations (TBO, the network-wide 4D flight trajectories planning (N4DFTP problem has been investigated with the purpose of safely and efficiently allocating 4D trajectories (4DTs (3D position and time for all the flights in the whole airway network. Considering that the introduction of large-scale 4DTs inevitably increases the problem complexity, an efficient model for strategic-level conflict management is developed in this paper. Specifically, a bi-objective N4DFTP problem that aims to minimize both potential conflicts and the trajectory cost is formulated. In consideration of the large-scale, high-complexity, and multi-objective characteristics of the N4DFTP problem, a multi-objective multi-memetic algorithm (MOMMA that incorporates an evolutionary global search framework together with three problem-specific local search operators is implemented. It is capable of rapidly and effectively allocating 4DTs via rerouting, target time controlling, and flight level changing. Additionally, to balance the ability of exploitation and exploration of the algorithm, a special hybridization scheme is adopted for the integration of local and global search. Empirical studies using real air traffic data in China with different network complexities show that the proposed MOMMA is effective to solve the N4DFTP problem. The solutions achieved are competitive for elaborate decision support under a TBO environment.

  16. Multi-Objective Fuzzy Linear Programming In Agricultural Production Planning

    Directory of Open Access Journals (Sweden)

    H.M.I.U. Herath

    2015-08-01

    Full Text Available Abstract Modern agriculture is characterized by a series of conflicting optimization criteria that obstruct the decision-making process in the planning of agricultural production. Such criteria are usually net profit total cost total production etc. At the same time the decision making process in the agricultural production planning is often conducted with data that accidentally occur in nature or that are fuzzy not deterministic. Such data are the yields of various crops the prices of products and raw materials demand for the product the available quantities of production factors such as water labor etc. In this paper a fuzzy multi-criteria mathematical programming model is presented. This model is applied in a region of 10 districts in Sri Lanka where paddy is cultivated under irrigated and rain fed water in the two main seasons called Yala and Maha and the optimal production plan is achieved. This study was undertaken to find out the optimal allocation of land for paddy to get a better yield while satisfying the two conflicting objectives profit maximizing and cost minimizing subjected to the utilizing of water constraint and the demand constraint. Only the availability of land constraint is considered as a crisp in nature while objectives and other constraints are treated as fuzzy. It is observed that the MOFLP is an effective method to handle more than a single objective occurs in an uncertain vague environment.

  17. Working memory and planning during sentence production.

    Science.gov (United States)

    Martin, Randi C; Yan, Hao; Schnur, Tatiana T

    2014-10-01

    Speakers retrieve conceptual, syntactic and lexical information in advance of articulation during sentence production. What type of working memory (WM) store is used to hold the planned information before speaking? To address this question, we measured onset latencies when subjects produced sentences that began with either a complex or a simple initial noun phrase, while holding semantic, phonological or spatial information in WM. Although we found that subjects had longer onset latencies for sentences beginning with a complex noun phrase, showing a phrasal scope of planning, the magnitude of this complexity effect was not affected by any type of WM load. However, subjects made more syntactic errors (but not lexical errors) for sentences beginning with a complex noun phrase, suggesting that advance planning for these phrases occurs at a syntactic rather than lexical-semantic level, which may account for the lack of effect with various types of WM load in the current study. Copyright © 2014 Elsevier B.V. All rights reserved.

  18. Data management and data analysis techniques in pharmacoepidemiological studies using a pre-planned multi-database approach

    DEFF Research Database (Denmark)

    Bazelier, Marloes T.; Eriksson, Irene; de Vries, Frank

    2015-01-01

    pharmacoepidemiological multi-database studies published from 2007 onwards that combined data for a pre-planned common analysis or quantitative synthesis. Information was retrieved about study characteristics, methods used for individual-level analyses and meta-analyses, data management and motivations for performing...... meta-analysis (27%), while a semi-aggregate approach was applied in three studies (14%). Information on central programming or heterogeneity assessment was missing in approximately half of the publications. Most studies were motivated by improving power (86%). CONCLUSIONS: Pharmacoepidemiological multi...

  19. A Call for Strategic Planning: The Two-Year College Imperative.

    Science.gov (United States)

    Masoner, David J.; Essex, Nathan, L.

    1987-01-01

    Addresses the imperative for strategic and tactical planning to support the viability of the two-year college. Describes a process for approaching strategic planning, comprising the following steps: self-identification, self-analysis, analysis of service area, informed decision making, and the development of a marketing plan. (CBC)

  20. Computing Division two-year operational plan, FY 1981-1982

    International Nuclear Information System (INIS)

    Euald, R.H.; Worlton, W.J.; McCormick, M.

    1981-02-01

    This report is a comprehensive planning guide for the Computing Division of the Los Alamos National Laboratory for fiscal years 1981 and 1982. Subjects discussed include critical issues, programmatic requiements, hardware plans, software projects, direct user services, research projects, and projections of future developments

  1. Analysis of Various Multi-Objective Optimization Evolutionary Algorithms for Monte Carlo Treatment Planning System

    CERN Document Server

    Tydrichova, Magdalena

    2017-01-01

    In this project, various available multi-objective optimization evolutionary algorithms were compared considering their performance and distribution of solutions. The main goal was to select the most suitable algorithms for applications in cancer hadron therapy planning. For our purposes, a complex testing and analysis software was developed. Also, many conclusions and hypothesis have been done for the further research.

  2. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    International Nuclear Information System (INIS)

    None, None

    2016-01-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  3. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Bush, Shane [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”

  4. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-09-13

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  5. Multi-level analysis in information systems research: the case of enterprise resource planning system usage in China

    Science.gov (United States)

    Sun, Yuan; Bhattacherjee, Anol

    2011-11-01

    Information technology (IT) usage within organisations is a multi-level phenomenon that is influenced by individual-level and organisational-level variables. Yet, current theories, such as the unified theory of acceptance and use of technology, describe IT usage as solely an individual-level phenomenon. This article postulates a model of organisational IT usage that integrates salient organisational-level variables such as user training, top management support and technical support within an individual-level model to postulate a multi-level model of IT usage. The multi-level model was then empirically validated using multi-level data collected from 128 end users and 26 managers in 26 firms in China regarding their use of enterprise resource planning systems and analysed using the multi-level structural equation modelling (MSEM) technique. We demonstrate the utility of MSEM analysis of multi-level data relative to the more common structural equation modelling analysis of single-level data and show how single-level data can be aggregated to approximate multi-level analysis when multi-level data collection is not possible. We hope that this article will motivate future scholars to employ multi-level data and multi-level analysis for understanding organisational phenomena that are truly multi-level in nature.

  6. The career intentions, work-life balance and retirement plans of dental undergraduates at the University of Bristol.

    Science.gov (United States)

    Puryer, J; Patel, A

    2016-02-26

    Aim To investigate the career intentions, work-life balance and retirement plans of dental undergraduates at the University of Bristol in 2015.Method Cross-sectional survey of 210 clinical undergraduates using an anonymous self-report questionnaire.Results The response rate was 79%. The majority (81.7%) were 'satisfied' or 'extremely satisfied' with their choice of career. The majority (78.7%) felt men and women are equally likely to succeed in dentistry, although 42.9% felt men had an advantage over women with regards to career success. The majority (81.6%) intend on working within general practice, 11.3% within hospital dental services and 2.1% within community dental services. The majority (70.5%) intend to specialise within dentistry. Only 1.8% of participants intend on providing only National Health Service (NHS) dental treatment whereas the 86.5% would provide both NHS and private dental treatment. Fifteen years after qualifying, 52.2% plan to work part-time, and 37.8% intend on retiring at the age of 60 or below. The majority (86.6%) felt that childcare should be shared equally between both parents. Female students intend to take more time out of their career to concentrate on childcare and felt that having a child would affect their career more than males.Conclusion The anticipated career plans, work-life balance and retirement plans of undergraduates change over time, and further research should be carried out to monitor future career intentions of dental students in order to help with dental workforce planning.

  7. Link and route availability for Inter-working multi-hop wireless networks

    CSIR Research Space (South Africa)

    Salami, O

    2009-09-01

    Full Text Available pairs in inter-working multi-hop wireless networks can be evaluated based on the availability and reliability of radio links that form the communication path linking the nodes. This paper presents an analytical study of the link and route availability...

  8. Analysis of route availability in inter-working multi-hop wireless networks

    CSIR Research Space (South Africa)

    Salami, O

    2009-07-01

    Full Text Available In order to link a source-destination node pair in inter-working multi-hop wireless networks, links or routes must first be available. It is only after establishing the availability of links and routes between nodes that factors which affect...

  9. ICSU celebrates 75 years with a new Strategic Plan

    Institute of Scientific and Technical Information of China (English)

    Thomas Rosswall; Carthage Smith

    2006-01-01

    @@ In 2006, ICSU celebrates 75 years of supporting international, interdisciplinary science. 2006 is a doubly significant year for ICSU as it also marks the start of the first ever ICSU Strategic Plan, 2006-2011, which signals both a new vision and a new mode of operation for the Council. This plan is the culmination of an extensive review and consultation exercise that involved the entire ICSU membership. It was unanimously endorsed by the ICSU General Assembly,including IUGS, which met in Suzhou, China in October 2005.

  10. Fermilab ACP multi-microprocessor project

    International Nuclear Information System (INIS)

    Gaines, I.; Areti, H.; Biel, J.; Bracker, S.; Case, G.; Fischler, M.; Husby, D.; Nash, T.

    1984-08-01

    We report on the status of the Fermilab Advanced Computer Program's project to provide more cost-effective computing engines for the high energy physics community. The project will exploit the cheap, but powerful, commercial microprocessors now available by constructing modular multi-microprocessor systems. A working test bed system as well as plans for the next stages of the project are described

  11. Sustainable energy planning by using multi-criteria analysis application in the island of Crete

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Drandaki, Maria; Frantzeskaki, Niki; Iosifidis, Eleftherios; Kiosses, Ioannis

    2009-01-01

    The sustainable energy planning includes a variety of objectives, as the decision-making is directly related to the processes of analysis and management of different types of information (technological, environmental, economic and social). Very often, the traditional evaluation methods, such as the cost-benefit analysis and macro-economic indicators, are not sufficient to integrate all the elements included in an environmentally thorough energy plan. On the contrary the multiple criteria methods provide a tool, which is more appropriate to assemble and to handle a wide range of variables that is evaluated in different ways and thus offer valid decision support. This paper exploits the multi-criteria methodology for the sustainable energy planning on the island of Crete in Greece. A set of energy planning alternatives are determined upon the implementation of installations of renewable energy sources on the island and are assessed against economic, technical, social and environmental criteria identified by the actors involved in the energy planning arena. The study constitutes an exploratory analysis with the potential to assist decision makers responsible for regional energy planning, providing them the possibility of creating classifications of alternative sustainable energy alternatives.

  12. Proximity and physical navigation in collaborative work with a multi-touch wall-display

    DEFF Research Database (Denmark)

    Jakobsen, Mikkel Rønne; Hornbæk, Kasper

    2012-01-01

    Multi-touch, wall-sized displays afford new forms of collaboration. Yet, most data on collaboration with multi-touch displays come from tabletop settings, where users often sit and where space is a limited resource. We study how two-person groups navigate in relation to a 2.8m!1.2m multi-touch di......-touch display with 24.8 megapixels and to each other when solving a sensemaking task on a document collection. The results show that users physically navigate to shift fluently among different parts of the display and between parallel and joint group work....

  13. TÉCNICAS EVOLUTIVAS EN PROBLEMAS MULTI-OBJETIVOS EN EL PROCESO DE PLANIFICACIÓN DE LA PRODUCCIÓN / EVOLUTIONARY TECHNIQUES FOR MULTI-OBJECTIVE PROBLEMS IN PRODUCTION PLANNING

    Directory of Open Access Journals (Sweden)

    Mariano Frutos-Alazard

    2012-01-01

    Full Text Available La planificación, en el ámbito productivo, se encarga de diseñar, coordinar, administrar y controlar todas las operaciones que se hallan presentes en la explotación de los sistemas productivos. En este marco de trabajo, aparecen numerosos Problemas de Optimización Multi-objetivo (MOPs. Éstos constan de varias funciones que suelen ser complejas y evaluarlas puede ser muy costoso. La optimización multi-objetivo es la disciplina que trata de encontrar las soluciones, denominadas Pareto óptimas, a este tipo de problemas. La compleja resolución de los MOPs es debida a las dimensiones propias del problema, al carácter combinatorio de los algoritmos y a la naturaleza de los objetivos, los cuales están vinculados a la eficiencia del sistema. En las últimas décadas muchos MOPs vinculados a la producción han sido tratados con éxito con técnicas de resolución basadas en Algoritmos Genéticos. En este trabajo se evalúa a NSGAII (Non-dominated Sorting Genetic Algorithm II, SPEAII (Strength Pareto Evolutionary Algorithm II y a sus antecesores, NSGA y SPEA, en el proceso de planificación de la producción no estandarizada. Luego de la experiencia realizada, el algoritmo NSGAII mostró mayor eficiencia.Planning in production environments takes care of designing, coordinating, managing and controlling all the operations existing in the use of productive systems. There are, in the framework analyzed within this work, several relevant Multi-Objective Optimization Problems (MOPs. They consist of several functions which tend to be complex and expensive to evaluate. Multi-objective optimization is the discipline developed to provide solutions, called Pareto optimal, for the simultaneous optimization of those functions. The costs of solving MOPs is due to the dimension of the problems, the combinatorial nature of the algorithms and the kind of objectives represented, linked to the efficiency of the system.. In the last decades several production

  14. Changing ‘Multi-Problem Families’ – Developing a Multi-Contextual Systemic Approach

    Directory of Open Access Journals (Sweden)

    2007-05-01

    Full Text Available Over the past 30 years the Marlborough Family Service in London has pioneered multi-family work with marginalized families presenting simultaneously with abuse and neglect, family violence, substance misuse, educational failure and mental illness. The approach is based on a systemic multi-contextual mode and this chapter describes the evolving work, including the establishment of the first permanent multiple family day setting, specifically designed for and solely dedicated to the work with seemingly ‘hopeless’ families. The ingredients of ‘therapeutic assessments’ of parents and families are outlined and the importance of initial network meetings with professionals and family members is emphasized.

  15. Integrating ALARA into work planning and organization

    International Nuclear Information System (INIS)

    Croft, J.R.; Robb, J.D.

    1993-01-01

    This paper presents various organizational structures and systematic approaches that can be of benefit in integrating ALARA into work planning and organization. It is possible to have elegant policy statements, procedures and organizations and yet fail to implement ALARA effectively. The real key to success in ALARA work management is to recognize that ALARA is primarily a way of thinking and to secure the commitment of individuals at all levels within the organization, from senior management to workers carrying out specific tasks. The authors explain that the recommendations of ICRP Publication 60 will have an impact and will maintain the downward pressure on individual doses. 6 figs

  16. A brief introduction of the constructing work of national radiation monitoring system during the twelfth five-year

    International Nuclear Information System (INIS)

    Liu Hua; Zhao Yongkang; Pan Su; Zhang Jiali; Yang Bin

    2013-01-01

    Radiation monitoring is the technical groundwork of nuclear and radiation safety regulating. In order to overcome the challenges coming with the development of nuclear energy and technology in china, the program of constructing National Radiation Monitoring System (NRMS) was put forward in the twelfth five-year plan of nuclear safety and prevention of radiation pollution, and the view target in 2020. The implementation plan of the constructing of NRMS has been drew up by the Ministry of Environmental Protection in 2012, which including the construction of organization and human resource system, laws and standards system, quality assurance system, technical research and innovation system, and capability insurance system. A brief introduction of the implementation plan was given in the article, the achievements during the eleventh five-year were reviewed, the challenges and working points were analyzed. (authors)

  17. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods

  18. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    International Nuclear Information System (INIS)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-01-01

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results

  19. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    Energy Technology Data Exchange (ETDEWEB)

    Josimović, Boško, E-mail: bosko@iaus.ac.rs; Marić, Igor; Milijić, Saša

    2015-02-15

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.

  20. Multi-assortment rhythmic production planning and control

    Science.gov (United States)

    Skolud, B.; Krenczyk, D.; Zemczak, M.

    2015-11-01

    A method for production planning in a repetitive manufacturing system which allows for estimating the possibility of processing work orders in due time is presented. The difference between two approaches are presented; the first one one-piece flow elaborated in Toyota and the second one elaborated by authors that consists in defining sufficient conditions to filter all solutions and providing a set of admissible solutions for both the client and the producer. In the paper attention is focused on the buffer allocation. Illustrative examples are presented.

  1. 24 CFR 203.203 - Issuance and nature of insured 10-year protection plans.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Issuance and nature of insured 10... Underwriting Procedures Insured Ten-Year Protection Plans (plan) § 203.203 Issuance and nature of insured 10-year protection plans. (a) Plans may be issued: (1) By a builder, warranty company, insurance company...

  2. Multi-year Droughts in California in the Last Two Decades

    Science.gov (United States)

    Myoung, B.; Kafatos, M.

    2016-12-01

    Multi-year droughts in California including the notorious 2013-2014 drought became serious problems recently, causing significant socio-economic damages. In the present study, focusing on the three multi-year droughts in California, i.e., 1999-2002, 2007-2009, and 2012-2014, during the recent two decades (1995-2014), we compared and investigated their characteristics of the atmosphere and the oceans. By positioning abnormally strong anticyclonic circulations at 500 hPa over the North Pacific, the droughts seem to start around strong La Niña years and continued or intensified until the year prior to an El Niño. While precipitation decreases in La Niña years have been well documented previously, the intensification of droughts in the later period has not. The Empirical Orthogonal Function (EOF) and correlation analyses suggest that, around strong La Niña years, the first EOF mode (EOF1) of the 500 hPa height is active, while the second EOF mode (EOF2) becomes active in moderate/weak La Nina years. It is also found that while EOF1 is sensitive to SST variability in the central Pacific which is associated with the major ENSO events, EOF2 is sensitive to that in the western/South Pacific. Relations to various climate variability other than ENSO, e.g., Pacific Decadal Oscillation (PDO), Tropical/Northern Hemisphere (TNH), Pacific/North American (PNA), and North Atlantic Oscillation (NAO), are also examined.

  3. Participatory planning intercultural: Reflections for social work

    Directory of Open Access Journals (Sweden)

    Esperanza Gómez Hernández

    2012-01-01

    Full Text Available Since the nineties, participatory planning has emerged as a linking strategy for various social, political, economic and cultural sectors that assessed it as a potential for building consensus in the making of local processes forsocial improvement. Similarly, it was legitimized as a setting for practice for professionals trained in the social sciences, mainly Social Work. This article, from a geopolitical and geo-cultural perspective, presents contextual elements that determined the configuration of participatory planning in Latin America. These elements shall be staged in order to redefine diversity and the intercultural perspective that has been linked to this mobilizing strategy, against the institutionalized discourse of development and for the emergence of crisis and ruptures with this social paradigm from other practices and worldviews of life in the territories.

  4. Chief Financial Officer FY 1997 status report and five-year plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The Chief Financial Officers Act of 1990 (CFO Act) establishes the legal framework for improved Federal financial management. The Act requires the agency CFO to prepare, and annually revise, a plan to implement the Office of Management and Budget (OMB) Federal Financial Management Status Report and Five-Year Plan. This is the sixth Status Report and Five-Year Plan submission to OMB by the Department of Energy (DOE). Financial management at the Department operates in an environment of Government-wide efforts to improve financial management and implements legislation and administrative provisions which stress the need for change. This report sets forth the Department`s plans for financial management improvements in the coming years. It also highlights several new initiatives completed or currently underway that will significantly improve the overall effectiveness of financial management at the Department of Energy.

  5. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  6. Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning

    Science.gov (United States)

    Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.

    2016-01-01

    Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…

  7. Economic-mathematical model of planning construction-installation work for automation in drilling

    Energy Technology Data Exchange (ETDEWEB)

    Tsay, L K

    1979-01-01

    The basis for increasing oil extraction is an increase in the volume of drilling operations which includes a set of work done by specialized enterprises, installation-adjustment administrations (IAA). Operational-calendar planning in the IAA still has many shortcomings. The main tasks of operational-calendar planning in the IAA can include distribution of work by facilities between specialized brigades and the formation of a schedule for shipping materials to the objects of the construction-installation operations. The basic criteria for optimization in operational-calendar planning are the maximum labor productivity, minimum duration of fulfillment of work, uniform consumption of resources, minimization of outlays for production of work. The second and the fourth criteria are inapplicable because of limited resources with directive periods of fulfilling the work. The first and third criterion mutually exclude each other. Since they are of equal value, it is suggested that the criterion be such an indicator as uniform consumption of resources. Then, by minimizing the degree of nonuniformity of consumption of the output of IAA contractors, one can determine the optimal uniform consumption of resources.

  8. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  9. Program plan, and request for reprogramming first year funds. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  10. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, Carl J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  11. Environmental compliance program FY 1999 multi-year work plan, WBS 1.8.2.3

    Energy Technology Data Exchange (ETDEWEB)

    Giese, K.A.

    1998-08-28

    The Environmental Compliance Program is developing and implementing a PHMC-wide chemical management system with the goal being to: (1) manage and control chemicals from procurement through use and final disposition; (2) develop and maintain procedures for identifying and evaluating hazards and environmental impacts present in facilities, and the hazard classification of the facilities. The US Department of Energy (DOE) may promulgate the final rule, 1 0 CFR 834, Radiation Protection of the Public and the Environment in FY 1999. This rule establishes controls for the release of radioactive material and limits for the amount of radiation exposure to the public and the environment. It will be applicable to activities of DOE contractors at the Hanford site. This rule is expected to replace the bulk of DOE Orders 5400.5, Radiation Protection of the Public and the Environment and 5400. 1, General Environmental Protection Program. In doing so, these Orders will be backed by the Price-Anderson enforcement procedures and carry penalties for non-compliance.

  12. Environmental compliance program FY 1999 multi-year work plan, WBS 1.8.2.3

    International Nuclear Information System (INIS)

    Giese, K.A.

    1998-01-01

    The Environmental Compliance Program is developing and implementing a PHMC-wide chemical management system with the goal being to: (1) manage and control chemicals from procurement through use and final disposition; (2) develop and maintain procedures for identifying and evaluating hazards and environmental impacts present in facilities, and the hazard classification of the facilities. The US Department of Energy (DOE) may promulgate the final rule, 1 0 CFR 834, Radiation Protection of the Public and the Environment in FY 1999. This rule establishes controls for the release of radioactive material and limits for the amount of radiation exposure to the public and the environment. It will be applicable to activities of DOE contractors at the Hanford site. This rule is expected to replace the bulk of DOE Orders 5400.5, Radiation Protection of the Public and the Environment and 5400. 1, General Environmental Protection Program. In doing so, these Orders will be backed by the Price-Anderson enforcement procedures and carry penalties for non-compliance

  13. Work hazard prevention plans

    International Nuclear Information System (INIS)

    Albertos Campos, F.

    2009-01-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  14. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  15. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow

  16. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  17. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year

  18. An Integrated Extravehicular Activity Research Plan

    Science.gov (United States)

    Abercromby, Andrew F. J.; Ross, Amy J.; Cupples, J. Scott

    2016-01-01

    Multiple organizations within NASA and outside of NASA fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Research Plan will be conducted annually. External peer review of all HRP EVA research activities including compilation and review of published literature in the EVA Evidence Book is already performed annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the current Integrated EVA Research Plan are presented including description of ongoing and planned research activities in the areas of: Benchmarking; Anthropometry and Suit Fit; Sensors; Human

  19. Work environment perceptions following relocation to open-plan offices: A twelve-month longitudinal study.

    Science.gov (United States)

    Bergström, Jessica; Miller, Michael; Horneij, Eva

    2015-01-01

    A workplace's design can have various positive or negative effects on the employees and since the 1970s the advantages and disadvantages of open-plan offices have been discussed. The aim of this study was to investigate perceived health, work environment and self-estimated productivity one month before and at three, six and twelve months after relocation from individual offices to an open-plan office environment. Employees from three departments within the same company group and who worked with relatively similar tasks and who were planned to be relocated from private offices to open-plan offices were invited to participate. Questionnaires comprising items from The Salutogenic Health Indicator Scale, The Work Experience Measurement Scale, the questionnaire by Brennan et al. about perceived performance and one question from the Work Ability Index were sent to participants one month before relocation (baseline) to open-plan offices and then at three, six and twelve months after relocation. At baseline, 82 questionnaires were sent out. The response rate was 85%. At the follow-ups 77-79 questionnaires were sent out and the response-rate was 70%-81%. At follow-ups, perceived health, job satisfaction and performance had generally deteriorated. The results of the study indicate that employees' perception of health, work environment and performance decreased during a 12 month period following relocation from individual offices to open-plan offices.

  20. The dynamic multi-period vehicle routing problem

    DEFF Research Database (Denmark)

    Wen, Min; Cordeau, Jean-Francois; Laporte, Gilbert

    2010-01-01

    are to minimize total travel costs and customer waiting, and to balance the daily workload over the planning horizon. This problem originates from a large distributor operating in Sweden. It is modeled as a mixed integer linear program, and solved by means of a three-phase heuristic that works over a rolling...... planning horizon. The multi-objective aspect of the problem is handled through a scalar technique approach. Computational results show that the proposed approach can yield high quality solutions within reasonable running times....

  1. Retirement planning and work-related variables in Chinese older nurses: A cross-sectional study.

    Science.gov (United States)

    Liu, Peng-Cheng; Zhang, Huan-Huan; Zhang, Mei-Ling; Ying, Jie; Shi, Ying; Wang, Shou-Qi; Sun, Jiao

    2018-03-01

    To explore the situation of older nurses approaching retirement with regard to their retirement planning, and the relationship of their retirement planning behaviour with the job environment and job satisfaction under their current employment arrangements and other work-related variables. Nurse shortage has become a global phenomenon that can be alleviated by retaining older nurses in service. The Chinese government proposed the "Incremental Delay Retirement Age Policy." However, older nurses face delayed retirement but lack retirement plans. A cross-sectional questionnaire survey was conducted among a convenience sample of older retiring nurses (n = 152; 84.92% response rate) recruited from every department of four large general hospitals in Changchun, Jilin Province from June to August 2016. The majority of the respondents presented poor retirement planning (n = 122, 80.3%). The independent variables of information exchange with patients, teamwork and personal growth and development explained approximately 16.6% of the variance in retirement planning. Nurse-patient communication and personal growth and development can promote retirement planning, but teamwork is negatively related to retirement planning. Retirement planning by Chinese older nurses is related to certain work-related variables. However, many other work-related variables were not associated with retirement planning and require further research. Overall, Chinese older retiring nurses must improve their retirement planning practices. © 2017 John Wiley & Sons Ltd.

  2. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  3. 78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability

    Science.gov (United States)

    2013-10-24

    ... disadvantages of current and emerging alternatives for the exchange of regulated study data, and (2) issuing a... primary document for guiding all major aspects of FDA's multi-year initiative to develop and implement TA... is announcing the availability of the TA Project Plan. This TA Project Plan will be the primary...

  4. Twenty-Five Year Site Plan FY2013 - FY2037

    Energy Technology Data Exchange (ETDEWEB)

    Jones, William H. [Los Alamos National Laboratory

    2012-07-12

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual

  5. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  6. Multi criteria analysis for the long term planning of the mexican electrical system expansion - 337

    International Nuclear Information System (INIS)

    Martin-del-Campo, C.; Guadarrama, R.; Francois, J.L.

    2010-01-01

    A multi-criteria analysis was applied to the long term electricity expansion planning for Mexico for the 2008-2030 period. This methodology is based on a fuzzy logic inference system, which allows for the definition of a decision function that takes into account all the evaluation parameters. This function permits one to rank the alternative expansion plans in order to determine the most attractive option. In this study four evaluation parameters were considered: (a) the total generating cost obtained from an optimization expansion using the WASP-IV model, (b) the economic risk associated with fuel prices increases, (c) the diversity of technologies in the mix, and (d) the external costs. The analysis was applied to a base case and to three additional expansion cases, which are very similar to the base case, but each of them excludes the addition of a certain type of candidate technology in the optimization planning. The base case is Plan A which has six candidate technologies available for the optimization planning. Plan B excludes coal; Plan C excludes oil, and Plan D excludes nuclear energy. After the decision analysis was made it was found that Plan B is best followed by Plan A, then Plan C and finally Plan D. The worst plan expansion was obtained when the nuclear candidate was excluded in the program of additions during the time period. The primary conclusion is that nuclear energy must participate in the mix of electricity generation. This result can be used to define the energy policy for electricity production in Mexico in the medium-long term scenario. (authors)

  7. Student Centric Learning Through Planned Hard work - An Innovative Model

    OpenAIRE

    Aithal, Sreeramana; Aithal, Shubrajyotsna

    2016-01-01

    The strategies followed by educational institutions and the students become very important when the performance of students in the examinations is concerned. By means of properly planned and well guided model of training and motivation to do hard work, students can follow a well disciplined study plan and become exceptionally successful in examinations. Teaching and training by experienced and dedicated faculty members, continuous support by parents and motivating the students based on settin...

  8. Loss in working years after a breast cancer diagnosis.

    Science.gov (United States)

    Plym, Anna; Bower, Hannah; Fredriksson, Irma; Holmberg, Lars; Lambert, Paul C; Lambe, Mats

    2018-03-06

    Breast cancer can negatively influence working life, but it is unclear how many working years women with breast cancer can expect to lose. Women diagnosed with breast cancer between 1997 and 2012 were identified in the Breast Cancer Data Base Sweden (N=19 661), together with breast cancer-free comparison women (N=81 303). Using flexible parametric survival modelling, the loss in working years was calculated as the difference in the remaining years in the work force between women with and without breast cancer. Women aged 50 years at diagnosis with stage I disease lost on average 0.5 years (95% CI, 0.2-0.7) of their remaining working time; the corresponding estimates were 0.9 years (0.5-1.2) in stage II, 2.5 years (1.9-3.1) in stage III and 8.1 years (6.5-9.7) in stage IV. Women with in situ breast cancer did not lose any working years. The strongest treatment determinant was axillary lymph node dissection. We found a loss in working years not only in late but also in early-stage breast cancer. Although it is reassuring that some groups had no or only a modest work loss, the economic consequences for society are considerable given the large number of women annually diagnosed with breast cancer.

  9. Stock-based vs. fleet-based evaluation of the multi-annual management plan for the cod stocks in the Baltic Sea

    DEFF Research Database (Denmark)

    Bastardie, Francois; Vinther, Morten; Nielsen, J. Rasmus

    2010-01-01

    parameters are assumed constant. For the Eastern Baltic stock, additional sources of uncertainties from fishery adaptation to the plan are tested using a fleet-based and spatially explicit version of the model which leads to higher reductions in F and no significant change in management robustness......This study evaluated the EU 2008 multi-annual plan for Baltic cod stock recovery. The plan combines harvest control rules that set TACs with reductions in direct effort (E) and fishing mortality (F). Performance and robustness of the plan are tested with a management strategy evaluation model (MSE...

  10. Psychotherapeutic and work-oriented interventions: employment outcomes among young adults with work disability due to a mental disorder.

    Science.gov (United States)

    Mattila-Holappa, Pauliina; Joensuu, Matti; Ahola, Kirsi; Koskinen, Aki; Tuisku, Katinka; Ervasti, Jenni; Virtanen, Marianna

    2016-01-01

    We examined the extent to which psychotherapeutic and work-oriented interventions were included in a medical treatment and rehabilitation plan and whether they predicted future employment among young adults with work disability due to a mental disorder. Data were obtained from the treatment and rehabilitation plans of 1163 young adults aged 18‒34 years, who in 2008 were granted fixed-term work disability compensation due to a mental disorder and were followed for 5 years. Forty-six percent had no proposal for psychotherapy or a work-oriented intervention in their treatment and rehabilitation plan, 22 % had a plan for only a psychotherapeutic intervention, 23 % had a plan for only a work-oriented intervention, and 10 % had both types of interventions planned. Having a planned psychotherapeutic intervention (HR = 1.35, 95 % CI 1.07-1.69) and of the work-oriented interventions, planned rehabilitative courses and training (HR = 1.34, 95 % CI 1.03-1.70) predicted quicker entry into competitive employment. Having a plan for both a psychotherapeutic and work-oriented intervention was associated with being employed at the end of the follow-up (OR = 1.77, 95 % CI 1.07-2.95). Young adults with a long-term psychiatric work disability episode rarely have a recorded plan for rehabilitation in their treatment and rehabilitation plan although psychotherapeutic interventions and a combination of a psychotherapeutic and work-oriented intervention might help them gain employment.

  11. A Multi-Criteria Methodology to Support Public Administration Decision Making Concerning Sustainable Energy Action Plans

    Directory of Open Access Journals (Sweden)

    Chiara Novello

    2013-08-01

    Full Text Available For municipalities that have joined the Covenant of Mayors promoted by the European Commission, the Sustainable Energy Action Plan (SEAP represents a strategic tool for achieving the greenhouse gas reductions required by 2020. So far as the energy retrofit actions in their residential building stock are concerned, which in the small-to-medium municipalities are responsible for more than 60% of CO2 emissions, the scenarios for intervening are normally decided on the basis of an economic (cost/performance analysis. This type of analysis, however, does not take into account important aspects for small and medium-sized communities such as social aspects, environmental impacts, local economic development and employment. A more comprehensive and effective tool to support the choices of public administrators is the multi-criteria analysis. This study proposes a methodology that integrates multi-criteria analysis in order to support Public Administration/Local Authorities in programming Sustainable Energy Action Plans with a more targeted approach to sustainability. The methodology, based on the ELECTRE III method, was applied to a medium-size municipality in the Lombardy region of Italy. The results obtained with this approach are discussed in this paper.

  12. Production, staff, working time and financial planning

    Directory of Open Access Journals (Sweden)

    Orlando Boiteux

    2009-07-01

    Full Text Available Aggregate planning can be a tool for coordinating the tactical decisions belonging to some functional areas of a company. This potential has been limited due to methodological and technical reasons, but nowadays it is possible to solve very sophisticated models integrating, with a high level of detail, a great number of decisions of several functional areas and that permit to include new management schemes. In this paper, a production, staff, working time and cash management model is introduced.

  13. Year 2000 Contingency Planning and Cost Reporting at the Defense Finance and Accounting Service

    National Research Council Canada - National Science Library

    1998-01-01

    ...: complied with the requirements of the DoD Year 2000 Management Plan, prepared adequate Year 2000 system-level contingency plans, and reported complete and reliable Year 2000 system cost estimates...

  14. 2: Local area networks as a multiprocessor treatment planning system

    International Nuclear Information System (INIS)

    Neblett, D.L.; Hogan, S.E.

    1987-01-01

    The creation of a local area network (LAN) of interconnected computers provides an environment of multi computer processors that adds a new dimension to treatment planning. A LAN system provides the opportunity to have two or more computers working on the plan in parallel. With high speed interprocessor transfer, events such as the time consuming task of correcting several individual beams for contours and inhomogeneities can be performed simultaneously; thus, effectively creating a parallel multiprocessor treatment planning system

  15. Work-in-process clearing in supply chain operations planning

    NARCIS (Netherlands)

    Selcuk, B.; Fransoo, J.C.; Kok, de A.G.

    2008-01-01

    In this study we provide insights into the effectiveness of the clearing function concept in a hierarchical planning context. The clearing function is a mathematical representation of the relation between the Work-In-Process (WIP) and the throughput of a production process. We use it in a

  16. Process development work plan for waste feed delivery system

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis

  17. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  18. AREVA - 2012 annual results: significant turnaround in performance one year after launching the Action 2016 plan

    International Nuclear Information System (INIS)

    Duperray, Julien; Berezowskyj, Katherine; Kempkes, Vincent; Rosso, Jerome; Thebault, Alexandre; Scorbiac, Marie de; Repaire, Philippine du

    2013-01-01

    One year after launching Areva's Action 2016 strategic plan, the first results are in. AREVA is ahead of schedule in executing its recovery plan. While pursuing its efforts in the management of a few difficult projects (such as OL3), Areva group was able to return to a virtuous performance cycle rooted in strong growth in nuclear order intake and good progress on its cost reduction program. Commercially, despite the difficult economic environment, AREVA was able to capitalize on its leadership in the installed base and on its long-term partnerships with strategic customers, beginning with EDF, with which AREVA renewed a confident and constructive working relationship. Areva has secured 80% of its objective of one billion euros of savings by the end of 2015 to improve its competitiveness. The group also continued efforts to optimize working capital requirement and control the capital expenditure trajectory. Together, these results enabled AREVA to exceed the objectives set for 2012 for two key indicators of its strategic plan: EBITDA and free operating cash flow. Nearly 60% of the 2.1 billion euros devoted to capital expenditures for future growth in 2012 were funded by operations, a quasi-doubled share compared to 2011. Areva's floor target for asset disposals was achieved one year ahead of schedule, also helping the Group to control its net debt, which remained below 4 billion euros. In 2013, Areva is continuing to implement the Action 2016 plan to keep its turnaround on track. In summary: - Backlog renewed over the year 2012 to euro 45.4 bn thanks to the increase in nuclear order intake; - Sales revenue growth: euro 9.342 bn (+5.3% vs. 2011), led by nuclear and renewables operations; - Very sharp upturn in EBITDA: euro 1.007 bn (+euro 586 m vs. 2011) - Very net improvement in free operating cash flow: -euro 854 m (+euro 512 m vs. 2011); - Back to positive reported operating income: euro 118 m (+euro 1.984 bn vs. 2011); - 2012-2013 floor target for asset disposals

  19. Daya Bay Nuclear Power Station five-year business plan and operating results

    International Nuclear Information System (INIS)

    Zhang Shanming

    2000-01-01

    Guangdong Nuclear Power Joint Venture Company, Ltd. first 5-Year Business Plan (hereinafter referred to as 5-Year Business Plan) serves as guidance of both the operations and management of the company. Continuous performance improvement of the nuclear power station has been achieved through the fulfillment of goals and improvement plan defined by the 5-Year Business Plan, and through standard and systematic management. Daya Bay Nuclear Power Station (GNPS) has made great contributions to sustainable economic developments of both Guangdong and Hong Kong since its commercial operation in 1994. As of the end of 1999, the cumulative off-take electricity generated by GNPS had reached 69.9 billion kWh. Of the WANO indicators universally applied by nuclear power industry throughout the world, 6 indicators of Daya Bay performance entered the world top quartile while 9 the medium level

  20. A multi-criteria methodology for energy planning and developing renewable energy sources at a regional level: A case study Thassos, Greece

    International Nuclear Information System (INIS)

    Mourmouris, J.C.; Potolias, C.

    2013-01-01

    Rational energy planning under the pressure of environmental and economic problems is imperative to humanity. An evaluational framework is proposed in order to support energy planning for promoting the use of renewable energy sources. A multi-criteria decision analysis is adopted, detailing exploitation of renewable energy sources (including Wind, Solar, Biomass, Geothermal, and small Hydro) for power and heat generation. The aim of this paper is the analysis and development of a multilevel decision-making structure, utilizing multiple criteria for energy planning and exploitation of Renewable Energy Sources of at the regional level. The proposed evaluation framework focuses on the use of a multi-criteria approach as a tool for supporting energy planning in the area of concern, based on a pool of qualitative and quantitative evaluation criteria. The final aim of this study is to discover the optimal amount of each Renewable Energy Source that can be produced in the region and to contribute to an optimal energy mix. In this paper, a case study for the island of Thassos, Greece is analyzed. The results prove that Renewable Energy Sources exploitation at a regional level can satisfy increasing power demands through environmental-friendly energy systems that combine wind power, biomass and PV systems. - Highlights: ► An evaluational framework is proposed in order to support energy planning. ► A multi-criteria decision analysis is adopted, detailing exploitation of RES for power and heat generation. ► The aim is to discover the optimal amount of each RES that can be produced in each region.

  1. RFI/RI work plan for the Road A Chemical Basin 904-111G

    International Nuclear Information System (INIS)

    Kmetz, T.F.

    2000-01-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities

  2. RFI/RI work plan for the Road A Chemical Basin 904-111G

    Energy Technology Data Exchange (ETDEWEB)

    Kmetz, T.F.

    2000-03-07

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.

  3. Multi-annual planning of investments for heat production. 2009 - 2020 period

    International Nuclear Information System (INIS)

    2005-01-01

    A new Multi-annual Planning of Investments (PPI) for heat production in France has been realized in order to meet the conclusions of the Grenelle Environnement Forum for a better energy efficiency and a larger use of renewable energies. Based on quantitative data (the increase in heat production will reach more than 10 Mtoe by 2020), potential objectives have been assessed for the various heat production sources and techniques: wood, biomass (for buildings, district heating, industry and processes, cogeneration), deep and intermediary geothermal energy, individual heat pumps, individual and collective heat solar systems, biogas, etc. These objectives are said to be ambitious but reachable if every sources and techniques are thoroughly exploited

  4. Long working hours as a risk factor for atrial fibrillation: a multi-cohort study

    OpenAIRE

    Kivimaki, M.; Nyberg, S. T.; Batty, G. D.; Kawachi, I.; Jokela, M.; Alfredsson, L.; Bjorner, J. B.; Borritz, M.; Burr, H.; Dragano, N.; Fransson, E. I.; Heikkila, K.; Knutsson, A.; Koskenvuo, M.; Kumari, M.

    2017-01-01

    AIMS: Studies suggest that people who work long hours are at increased risk of stroke, but the association of long working hours with atrial fibrillation, the most common cardiac arrhythmia and a risk factor for stroke, is unknown. We examined the risk of atrial fibrillation in individuals working long hours (≥55 per week) and those working standard 35–40 h/week. METHODS AND RESULTS: In this prospective multi-cohort study from the Individual-Participant-Data Meta-analysis in Work...

  5. Engineering work plan for container venting system drill press assembly troubleshooting. Revision 1

    International Nuclear Information System (INIS)

    Prather, M.C.

    1994-11-01

    This work plan is for troubleshooting the current CVS drill press to ensure that the drill bit assembly doesn't bind in the press plate. A drill press assembly has been fabricated for the Container Venting System (CVS). The drill bit assembly has bound in the press plate in previous revisions of this design. Initial troubleshooting of the drill press per Rev. 0 of this work plan was performed at the 200W Kaiser Machine Shop under Work Package 2H9401670F, Internal Work Order E20027. The drill press operated without jamming. Then, during the pre-operational test on 11/14/17 and the operational test on 11/17/94, two drum lids were drilled. Immediately after the test on 11/17/94, the drill was again operated, and it jammed. An inspection found shavings at the bottom of the drill bit assembly, between the drill bit sleeve and the press plate bore. This revised work plan provides direction for the machine shop to diagnose and correct this recent problem

  6. CAREER PLANS OF GRADUATES OF A CANADIAN DENTAL SCHOOL: PRELIMINARY REPORT OF A 5-YEAR SURVEY.

    Science.gov (United States)

    Nassar, Usama; Fairbanks, Connor; Flores-Mir, Carlos; Kilistoff, Alan; Easton, Rick

    2016-07-01

    Comprehensive data on the characteristics and opinions of graduating dental students in Canada are lacking. Specifically, only minimal information is available on graduates' immediate career plans and factors that may influence their decisions regarding these plans. Our aim was to gather such data to allow better understanding of this issue and improve the design of future studies on this topic. The Career Development Committee at the school of dentistry, University of Alberta, designed a short survey to be administered to graduating students over 5 years to gain insight into their immediate career plans and opinions on career services at the school. Preliminary results from 2012-2014 are reported here. With a response rate of close to 90% (n = 99/111), the data reveal considerable differences in immediate career plans between the surveyed students and those in other schools in Canada and the United States. Of the students, 89% were planning to work in a general dental practice and only 9% were planning to enroll in advanced education, including general practice residency training. More research is needed to better understand the factors affecting career path decisions of students.

  7. Role of working memory components in planning performance of individuals with Parkinson's disease.

    Science.gov (United States)

    Altgassen, Mareike; Phillips, Louise; Kopp, Ute; Kliegel, Matthias

    2007-06-11

    The current study investigated the involvement of all four components of Baddeley's [Baddeley, A. D. (2000). The episodic buffer: A new component of working memory? Trends in Cognitive Sciences, 4, 417-423] revised working memory model in deficits of planning accompanying Parkinson's disease (PD). PD resulted in poorer formulation and execution of plans, as measured by the Tower of London task. PD also reduced the efficiency of the episodic buffer and central executive components of working memory, but did not influence storage of verbal or visuospatial information. Planning deficits in PD were particularly linked to problems in integrating multimodal short-term information with long-term memory (episodic buffer). These results emphasize the importance of integrative and executive processing in cognitive problems in PD, rather than simple memory deficits.

  8. Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included.

  9. Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1

    International Nuclear Information System (INIS)

    1994-09-01

    The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included

  10. 77 FR 24399 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year...

    Science.gov (United States)

    2012-04-24

    ... Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year Emissions Inventory AGENCY... approve the ozone 2002 base year emissions inventory, portion of the state implementation plan (SIP... technology (RACT), contingency measures, a 2002 base- year emissions inventory and other planning SIP...

  11. NASA Year 2000 (Y2K) Program Plan

    Science.gov (United States)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  12. Decision project related to the energy multi-year 2018/2023 planning (PPE). Evolution of capacities of production of power generating renewable energies: the headlong rush

    International Nuclear Information System (INIS)

    Perves, Jean-Pierre

    2016-01-01

    After having recalled that the French government, in its energy multi-year planning for 2018-2023, decided to develop wind and photovoltaic energies at a higher rate, despite their intermittency and the need for back-up nuclear and hydroelectric power plants (which do not emit carbon), and outlined that the power market is now in the torment, in France and in Europe, the author notices that such a development of renewable energies is a matter of concern in Europe, and indicates the objectives defined by the French government for onshore and offshore wind energy and for solar energy. Then, he proposes a critical analysis of the low level scenario of this development, a scenario which the author assesses as not very realistic. A table indicates the status and objectives for all the different renewable energies. The author discusses these values, notices that it is similar to a programme defined by the ADEME. He analyses the 2018/2023 low scenario (production, share, production efficiency, minimum and maximum power) by comparing it with the situation in 2015. He outlines important seasonal variations for wind and solar energy: their production level in winter requires a massive use of other sources. He briefly discusses the perspectives for 2030, and then addresses the development cost in terms of required investments. He discusses the impact of the scenario on greenhouse gas emissions. The appendix provides the official text of the decision project

  13. A2e High Fidelity Modeling: Strategic Planning Meetings

    Energy Technology Data Exchange (ETDEWEB)

    Hammond, Steven W. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sprague, Michael A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Womble, David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barone, Matt [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-11-01

    Atmosphere to electrons (A2e) is a multi-year U.S. Department of Energy (DOE) research initiative targeting significant reductions in the cost of wind energy through an improved understanding of the complex physics governing wind flow into and through whole wind farms. Better insight into the flow physics of large multi-turbine arrays will address the plant-level energy losses, is likely to reduce annual operational costs by hundreds of millions of dollars, and will improve project financing terms to more closely resemble traditional capital projects. In support of this initiative, two planning meetings were convened, bringing together professionals from universities, national laboratories, and industry to discuss wind plant modeling challenges, requirements, best practices, and priorities. This report documents the combined work of the two meetings and serves as a key part of the foundation for the A2e/HFM effort for predictive modeling of whole wind plant physics.

  14. Summary of Prioritized Research Opportunities. Building America Planning Meeting, November 2-4, 2010

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-02-01

    This report outlines the results of brainstorming sessions conducted at the Building America Fall 2010 planning meeting, in which research teams and national laboratories identified key research priorities to incorporate into multi-year planning, team research agendas, expert meetings, and technical standing committees.

  15. Gas and liquid sampling for closed canisters in KW Basin - Work Plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Work Plan for the design and fabrication of gas/liquid sampler for closed canister sampling in KW Basin. This document defines the tasks associated with the design, fabrication, assembly, and acceptance testing equipment necessary for gas and liquid sampling of the Mark I and Mark II canisters in the K-West basin. The sampling of the gas space and the remaining liquid inside the closed canisters will be used to help understand any changes to the fuel elements and the canisters. Specifically, this work plan will define the scope of work and required task structure, list the technical requirements, describe design configuration control and verification methodologies, detail quality assurance requirements, and present a baseline estimate and schedule

  16. Bidding behaviour in multi-unit auctions – an experimental investigation

    Czech Academy of Sciences Publication Activity Database

    Engelmann, Dirk; Grimm, V.

    2009-01-01

    Roč. 119, č. 537 (2009), s. 855-882 ISSN 0013-0133 Institutional research plan: CEZ:AV0Z70850503 Keywords : multi-unit auctions * bidding behavior * laboratory experiments Subject RIV: AH - Economics Impact factor: 1.902, year: 2009

  17. COLLABORATIVE MULTI-LEVEL PLAN MONITORING

    Directory of Open Access Journals (Sweden)

    Mohamad K. ALLOUCHE

    2011-01-01

    Full Text Available The recent worldwide connectivity and the net-centricity of military operations (coalition-based operations are witnessing an increasing need for the monitoring of plan execution for enhanced resource management and decision making. Monitoring of ongoing operations is the process of continuous observation recording and reporting. In this process the plan becomes a resource that needs to be managed effi ciently. The centralized approach to plan monitoring soon reaches its limits when plan execution is distributed across different organizations/countries. We propose a new framework that would allow different monitoring nodes distributed across the network. An effi cient propagation mechanism that allows information exchange between the different nodes would also be needed. The main purpose of this mechanism is to present the right information, to the right person, at the right time. To cope with a rapid increase of information fl ow through the network, an effi cient alarm management mechanism allows the presentation of the information with an appropriate level of details.

  18. 324 Building life cycle dose estimates for planned work

    Energy Technology Data Exchange (ETDEWEB)

    Landsman, S.D.; Peterson, C.A.; Thornhill, R.E.

    1995-09-01

    This report describes a tool for use by organizational management teams to plan, manage, and oversee personnel exposures within their organizations. The report encompasses personnel radiation exposures received from activities associated with the B-Cell Cleanout Project, Surveillance and Maintenance Project, the Mk-42 Project, and other minor activities. It is designed to provide verifiable Radiological Performance Reports. The primary area workers receive radiation exposure is the Radiochemical Engineering Complex airlock. Entry to the airlock is necessary for maintenance of cranes and other equipment, and to set up the rail system used to move large pieces of equipment and shipping casks into and out of the airlock. Transfers of equipment and materials from the hot cells in the complex to the airlock are required to allow dose profiles of waste containers, shuffling of waste containers to allow grouting activities to go on, and to allow maintenance of in-cell cranes. Both DOE and the Pacific Northwest Laboratory (PNL) are currently investing in state-of-the-art decontamination equipment. Challenging goals for exposure reduction were established for several broad areas of activity. Exposure estimates and goals developed from these scheduled activities will be compared against actual exposures for scheduled and unscheduled activities that contributed to exposures received by personnel throughout the year. Included in this report are life cycle exposure estimates by calendar year for the B-Cell Cleanout project, a three-year estimate of exposures associated with Surveillance and Maintenance, and known activities for Calendar Year (CY) 1995 associated with several smaller projects. These reports are intended to provide a foundation for future dose estimates, by year, requiring updating as exposure conditions change or new avenues of approach to performing work are developed.

  19. 324 Building life cycle dose estimates for planned work

    International Nuclear Information System (INIS)

    Landsman, S.D.; Peterson, C.A.; Thornhill, R.E.

    1995-09-01

    This report describes a tool for use by organizational management teams to plan, manage, and oversee personnel exposures within their organizations. The report encompasses personnel radiation exposures received from activities associated with the B-Cell Cleanout Project, Surveillance and Maintenance Project, the Mk-42 Project, and other minor activities. It is designed to provide verifiable Radiological Performance Reports. The primary area workers receive radiation exposure is the Radiochemical Engineering Complex airlock. Entry to the airlock is necessary for maintenance of cranes and other equipment, and to set up the rail system used to move large pieces of equipment and shipping casks into and out of the airlock. Transfers of equipment and materials from the hot cells in the complex to the airlock are required to allow dose profiles of waste containers, shuffling of waste containers to allow grouting activities to go on, and to allow maintenance of in-cell cranes. Both DOE and the Pacific Northwest Laboratory (PNL) are currently investing in state-of-the-art decontamination equipment. Challenging goals for exposure reduction were established for several broad areas of activity. Exposure estimates and goals developed from these scheduled activities will be compared against actual exposures for scheduled and unscheduled activities that contributed to exposures received by personnel throughout the year. Included in this report are life cycle exposure estimates by calendar year for the B-Cell Cleanout project, a three-year estimate of exposures associated with Surveillance and Maintenance, and known activities for Calendar Year (CY) 1995 associated with several smaller projects. These reports are intended to provide a foundation for future dose estimates, by year, requiring updating as exposure conditions change or new avenues of approach to performing work are developed

  20. Planning and Scheduling of Payloads of AstroSat During Initial and ...

    Indian Academy of Sciences (India)

    R. Pandiyan

    2017-06-20

    Jun 20, 2017 ... in semi-autonomous/manual mode and a complete automation is exercised for normal ... of a multi-wavelength astronomy space observatory and their working in PV .... greatly helps in the proper planning of mission oper-.

  1. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    Science.gov (United States)

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  2. System of optimization computations of five year plans in the coal industry. [USSR

    Energy Technology Data Exchange (ETDEWEB)

    Goyzman, E I; Korenev, V G

    1980-01-01

    A system of optimization computations of five year plans is set forth which was developed over a number of years at the Central Scientific Research Institute of Economics and Scientific-Technical Information of the Coal Industry. Basic principles of design and methodological approaches are given which were used in development of the systemas well as levels of administration and information links between them. The report analyzes the characteristics of problems of planning which arise at different stages of formation of the five year plans and discusses possibilities of taking into account these characteristics in optimized models. Economic formulations of problems of optimization of five year plans are given as applied to two levels of administration: at the branch level and at the level of production associations. Economic-mathematical models of optimization of five year plans are developed for each of the levels and their characteristic features described. The primary methodological principles, on the basis of which optimization models were developed are examined. An economic-mathematical model with continuous variables was developed for the branch level of planning. Volumes of recovery according to a group of shafts in the stage of normal operation (stable group) of each production enterprise are adopted as model variables. A system of limitations which includes limitations on volumes and distinguishable resources is formulated. The minimum of operating expenses, minimum of capital investments and maximum of recovery volumes for the planned period can be used as the optimization criteria. An economic-mathematical model which uses integral variable was developed for the production association level.

  3. New strategies for collision resolution of multi-access channel

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    Multi-access protocol is one of the commonlyapplied access control protocols,in which commonchannels is shared by multi-users(as shown inFig.1).In recent years,this protocol has been suc-cessfully applied to various communication sys-tems[1].Typical examples are satellite communica-tion system,mobile communication system,localarea net work(LAN)and metropolitan area net work(MAN).There are chiefly three kinds of Multi-ac-cess channel models,i.e.fixed allocation model,self-adjusting allocation model and rando...

  4. Hospital nurses' work environment, quality of care provided and career plans.

    Science.gov (United States)

    Hinno, S; Partanen, P; Vehviläinen-Julkunen, K

    2011-06-01

    In several European countries, the availability of qualified nurses is insufficient to meet current healthcare requirements. Nurses are highly dissatisfied with the rising demands of the healthcare environment and increasingly considering leaving their jobs. The study aims to investigate the relationships between the characteristics of hospital nurses' work environment and the quality of care provided, and furthermore to examine Dutch nurses' career plans. A cross-sectional, questionnaire survey of registered nurses (n = 334) working in the academic and district hospitals was conducted in 2005/2006. Previously validated questionnaires translated into the participants' language were used. Factor and regression analysis were used for data analysis. Overall, nurses rated their work environment rather favourably. Five work environment characteristics were identified: support for professional development, adequate staffing, nursing competence, supportive management and teamwork. Significant relationships were found between nurses' perceptions of their work environment characteristics and quality of care provided and nurses' career plans. When work environment characteristics were evaluated to be better, nurse-assessed quality of care also increased and intentions to leave current job decreased linearly. Study findings suggest that nurses' perceptions of their work environment are important for nurse outcomes in hospital settings. Further research is needed to explore the predictive ability of the work environment for nurse, patient and organizational outcomes in hospitals. © 2011 The Authors. International Nursing Review © 2011 International Council of Nurses.

  5. 77 FR 15142 - Updated Nuclear Regulatory Commission Fiscal Years 2008-2013 Strategic Plan

    Science.gov (United States)

    2012-03-14

    ... 2008-2013 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Strategic plan. SUMMARY: The U...-1614, Volume 5, ``U.S. Nuclear Regulatory Commission, Fiscal Years [FY] 2008-2013 Strategic Plan,'' dated February 2012. The updated FY 2008-2013 strategic plan describes the agency's mission and...

  6. Excavation of shafts and research galleries at the Mizunami Underground Research Laboratory. Construction work of MIU part 4. Construction progress report, fiscal year 2010-2011

    International Nuclear Information System (INIS)

    2014-11-01

    This progress report presents an outline compilation of construction activities, primary tasks performed, construction progress and safety patrol report, in fiscal year 2010-2011. The outline of construction activities is a summary based on the scope of work planned in 2010-2011: the main activities are based on the Tono Geoscience Center weekly reports; and the construction progress is based on the planned and actual schedules. The safety patrol report is based on defects recording by the safety manager of the Geoscience Facility Construction Section. Regarding the plan and actual performance of the construction work of MIU part IV (March 16, 2010 - March 15, 2012) performance carried out from April 1, 2010 until March 15, 2012 is described in this report. The attached appendices have been provided: regarding content in the excavated material bellowing the environmental standards, technical specifications of fiscal year 2010-2011 in construction work of MIU part IV, also photos of construction activities. (author)

  7. What weekday? How acute? An analysis of reported planned and unplanned GP visits by older multi-morbid patients in the Patient Journey Record System database.

    Science.gov (United States)

    Surate Solaligue, David Emanuel; Hederman, Lucy; Martin, Carmel Mary

    2014-08-01

    Timely access to general practitioner (GP) care is a recognized strategy to address avoidable hospitalization. Little is known about patients seeking planned (decided ahead) and unplanned (decided on day) GP visits. The Patient Journey Record System (PaJR) provides a biopsychosocial real-time monitoring and support service to chronically ill and older people over 65 who may be at risk of an avoidable hospital admission. This study aims to describe reported profiles associated with planned and unplanned GP visits during the week in the PaJR database of regular outbound phone calls made by Care Guides to multi-morbid older patients. One hundred fifty consecutive patients with one or more chronic condition (including chronic obstructive pulmonary disease, heart/vascular disease, heart failure and/or diabetes), one or more hospital admission in previous year, and consecutively recruited from hospital discharge, out-of-hour care and GP practices comprised the study sample. Using a semistructured script, Care Guides telephoned the patients approximately every 3 week days, and entered call data into the PaJR database in 2011. The PaJR project identified and prompted unplanned visits according to its algorithms. Logistic regression modelling and descriptive statistics identified significant predictors of planned and unplanned visits and patterns of GP visits on weekdays reported in calls. In 5096 telephone calls, unplanned versus planned GP visits were predicted by change in health state, significant symptom concerns, poor self-rated health, bodily pain and concerns about caregiver or intimates. Calls not reporting visits had significantly fewer of these features. Planned visits were associated with general and medication concerns, reduced social participation and feeling down. Planned visits were highest on Monday and trended downwards to Fridays. Unplanned visits were reported at the same rate each weekday and more frequently when the interval between calls was ≥3 days

  8. Design of multi-channel amplitude analyzer base on LonWorks

    International Nuclear Information System (INIS)

    Zhang Ying; Zhao Lihong; Chen Aihua

    2008-01-01

    The paper introduces the multi-channel analyzer which adopts LonWorks technology. The system detects the pulse peak by hardware circuits and controls data acquisition and network communication by Micro Controller and Unit and Neuron chip. SCM is programmed by Keil C51; the communication between SCM and nerve cell is realized by Neron C language, and the computer program is written by VB language. Test results show that this analyzer is with fast conversion speed and low power consumption. (authors)

  9. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey, a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H ampersand S) plan, and a waste management plan

  10. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2001-01-01

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  11. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  12. Public comments and responses to the 1993 Hanford cleanup five-year plan

    International Nuclear Information System (INIS)

    1993-08-01

    In March 1993, the US Department of Energy, Richland Operations Office (DOE-RL) published its annual Site-Specific Five-Year Plan. The Site-Specific Plan is published to inform the public about the background, status, and plans for Environmental Restoration (ER) and Waste Management (WM) activities at the Hanford site. It is the only document that seeks to bring all ER and WM elements together in one document. The Site-Specific Plan is a companion document to the National Five-Year Plan that deals with all the sites within the DOE complex on a summary level. This Response to Comments document does not try to address every question or concern raised during the public comment period. Some questions were outside the scope of the Five-Year Plan, some we could not decipher, others were variations of the same question. The initial round of public meetings was held in Portland, Oregon, and Seattle, Pasco, and Olympia, Washington. At the request of the Oregon Department of Energy (ODOE) and the Washington State Department of Ecology (Ecology), a second round of meetings was held in Portland and Olympia. Both agencies felt that the first two meetings were held with too little advance notice, and before the Plan could be distributed. Once the public meetings were over and the comment period closed, we then compiled the public comments, largely from audio tapes of the meetings. Individual functions within Hanford were asked to consider and respond to the comments

  13. Experience with the Multi-Year Implementation of an Industrial Control System

    CERN Document Server

    Kuhn, H K; Juillerat, A C; Rabany, Michel; Wollès, J C

    2000-01-01

    In 1990, CERN passed a multi-year purchasing and installation contract for the LEP 200 Cryogenics control system with ABB, one of the world's leading suppliers of integrated Distributed Control Systems (DCS). A financial framework provided over a period of eight years the required supplies. These were called up with so called "Release Orders", taking into account the latest technical developments. The issues and experiences with such a new approach and the resulting control system are described.

  14. Electric generating capacity planning: A nonlinear programming approach

    Energy Technology Data Exchange (ETDEWEB)

    Yakin, M.Z.; McFarland, J.W.

    1987-02-01

    This paper presents a nonlinear programming approach for long-range generating capacity expansion planning in electrical power systems. The objective in the model is the minimization of total cost consisting of investment cost plus generation cost for a multi-year planning horizon. Reliability constraints are imposed by using standard and practical reserve margin requirements. State equations representing the dynamic aspect of the problem are included. The electricity demand (load) and plant availabilities are treated as random variables, and the method of cumulants is used to calculate the expected energy generated by each plant in each year of the planning horizon. The resulting model has a (highly) nonlinear objective function and linear constraints. The planning model is solved over the multiyear planning horizon instead of decomposing it into one-year period problems. This approach helps the utility decision maker to carry out extensive sensitivity analysis easily. A case study example is provided using EPRI test data. Relationships among the reserve margin, total cost and surplus energy generating capacity over the planning horizon are explored by analyzing the model.

  15. Nuclear power enterprise tax planning strategy in the background of reform

    International Nuclear Information System (INIS)

    Wu Yimin

    2012-01-01

    The success of tax planning can be converted into enterprise's productivity, tax planning strategy can maximize the desired effects and bring out its full play to tax planning. Taking new round of tax reform in 12th five-year-plan and the reformation of professional groups as the background, the author detailedly conceived a frame of corporate tax planning strategy for nuclear power enterprises of China National Nuclear Corporation at the forefront of reformation from an all-round comprehensive view and multi-angle stand. (author)

  16. Transition to low carbon energy policies in China-from the Five-Year Plan perspective

    International Nuclear Information System (INIS)

    Yuan Xueliang; Zuo Jian

    2011-01-01

    Energy policy plays a critical role not only in the energy development, but also in the social and environmental aspects of a nation. Five-Year Plan for National Economic and Social Development is one of the most important government plans, which documents the national strategy during that period. This study presents a critical review of 12 Five-Year Plans that have been released by the Chinese central government in last 58 years. In particular, the recently released Twelfth Five-Year Plan is reviewed. The results clearly show a pattern of increasingly level of attention of Chinese government to energy efficiency improvement, air pollutant emission reduction, new and renewable energy development, carbon dioxide emission and climate change. - Highlights: → Critical review of the energy related contents in the 12 Five-Year Plans. → Energy policy of China is focusing on energy efficiency, new and renewable energy. → China is improving the capability of dealing with CO 2 emission and climate change. → China is on transition to low carbon energy policies for a sustainable development.

  17. Transition projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1. Volume 2

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1994-09-01

    This document contains information concerning the management of the Hanford Reservation. Information concerning the departmental schedules is presented in chart form. The following departmental schedules are included: The B-plant/Cesium Capsule Recovery, 300 Area Fuel Supply Program, Plutonium Finishing Plant, and Program and Environmental Management

  18. The multi-component model of working memory: explorations in experimental cognitive psychology.

    Science.gov (United States)

    Repovs, G; Baddeley, A

    2006-04-28

    There are a number of ways one can hope to describe and explain cognitive abilities, each of them contributing a unique and valuable perspective. Cognitive psychology tries to develop and test functional accounts of cognitive systems that explain the capacities and properties of cognitive abilities as revealed by empirical data gathered by a range of behavioral experimental paradigms. Much of the research in the cognitive psychology of working memory has been strongly influenced by the multi-component model of working memory [Baddeley AD, Hitch GJ (1974) Working memory. In: Recent advances in learning and motivation, Vol. 8 (Bower GA, ed), pp 47-90. New York: Academic Press; Baddeley AD (1986) Working memory. Oxford, UK: Clarendon Press; Baddeley A. Working memory: Thought and action. Oxford: Oxford University Press, in press]. By expanding the notion of a passive short-term memory to an active system that provides the basis for complex cognitive abilities, the model has opened up numerous questions and new lines of research. In this paper we present the current revision of the multi-component model that encompasses a central executive, two unimodal storage systems: a phonological loop and a visuospatial sketchpad, and a further component, a multimodal store capable of integrating information into unitary episodic representations, termed episodic buffer. We review recent empirical data within experimental cognitive psychology that has shaped the development of the multicomponent model and the understanding of the capacities and properties of working memory. Research based largely on dual-task experimental designs and on neuropsychological evidence has yielded valuable information about the fractionation of working memory into independent stores and processes, the nature of representations in individual stores, the mechanisms of their maintenance and manipulation, the way the components of working memory relate to each other, and the role they play in other

  19. Quantifying and improving the efficiency of Gamma Knife treatment plans for brain metastases: results of a 1-year audit.

    Science.gov (United States)

    Wright, Gavin; Hatfield, Paul; Loughrey, Carmel; Reiner, Beatrice; Bownes, Peter

    2014-12-01

    A method for quantifying the efficiency of Gamma Knife treatment plans for metastases was previously implemented by the authors to retrospectively identify the least efficient plans and has provided insights into improved planning strategies. The aim of the current work was to ascertain whether those insights led to improved treatment plans. Following completion of the initial study, a 1-year audit of metastasis plans created at St. James's Institute of Oncology was carried out. Audited recent plans were compared with the earlier plans of the initial study, in terms of their efficiency and dosimetric quality. The statistical significance of any differences between relevant plan parameters was quantified by Mann-Whitney U-tests. Comparisons were made between all plans and repeated for a reduced set of plans from which the smallest lesions treated with a single 4-mm shot were excluded. The plan parameters compared were a plan efficiency index (PEI), the number of shots, Paddick conformity index (PCI), gradient index (GI), and percent coverage (of the lesion by the prescription isodose). A total of 157 metastatic lesions were included in the audit and were compared with 241 in the initial study. In a comparison of all cases, the audited plans achieved a higher median PEI score than did the earlier plans from the initial study (1.08 vs 1.02), indicating improved efficiency of the audited plans. When the smallest lesions (for which there was little scope for varying plan strategy) were discounted, the improvement in median PEI score was greater (1.23 vs 1.03, p planning strategy yielding these efficiency improvements did not rely on the use of significantly fewer shots (median 11 vs 11 shots, p = 0.924), nor did it result in significant detriment to dosimetric quality (median coverage 99% vs 99%, median PCI 0.84 vs 0.83, p = 0.449, and median GI 2.72 vs 2.67, p = 0.701, audited plans vs initial plans, respectively). Choice of planning strategy can substantially affect

  20. Strategic and Unpressured Within-Task Planning and Their Associations with Working Memory

    Science.gov (United States)

    Li, Shaofeng; Fu, Mengxia

    2018-01-01

    This study investigated the comparative effects of strategic and unpressured within-task planning on second language (L2) Chinese oral production and the role of working memory in mediating the effects of the two types of planning. Twenty-nine L2 Chinese learners at a large New Zealand university performed a narrative task after watching a…

  1. Three years in - changing plan features in the U.S. health insurance marketplace.

    Science.gov (United States)

    McKillop, Caitlin N; Waters, Teresa M; Kaplan, Cameron M; Kaplan, Erin K; Thompson, Michael P; Graetz, Ilana

    2018-06-15

    A central objective of recent U.S. healthcare policy reform, most notably the Affordable Care Act's (ACA) Health Insurance Marketplace, has been to increase access to stable, affordable health insurance. However, changing market dynamics (rising premiums, changes in issuer participation and plan availability) raise significant concerns about the marketplaces' ability to provide a stable source of healthcare for Americans that rely on them. By looking at the effect of instability on changes in the consumer choice set, we can analyze potential incentives to switch plans among price-sensitive enrollees, which can then be used to inform policy going forward. Data on health plan features for non-tobacco users in 2512 counties in 34 states participating in federally-facilitated exchanges from 2014 to 2016 was obtained from the Centers for Medicaid & Medicare Services. We examined how changes in individual plan features, including premiums, deductibles, issuers, and plan types, impact consumers who had purchased the lowest-cost silver or bronze plan in their county the previous year. We calculated the cost of staying in the same plan versus switching to another plan the following year, and analyzed how costs vary across geographic regions. In most counties in 2015 and 2016 (53.7 and 68.2%, respectively), the lowest-cost silver plan from the previous year was still available, but was no longer the cheapest plan. In these counties, consumers who switched to the new lowest-cost plan would pay less in monthly premiums on average, by $51.48 and $55.01, respectively, compared to staying in the same plan. Despite potential premium savings from switching, however, the majority would still pay higher average premiums compared to the previous year, and most would face higher deductibles and an increased probability of having to change provider networks. While the ACA has shown promise in expanding healthcare access, continued changes in the availability and affordability of health

  2. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  3. Geotechnical information as an important element when planning and designing civil engineering work Bogotá

    OpenAIRE

    Denisse Cangrejo Aljure; Carlos Gustavo Infante

    2010-01-01

    The city of Bogota provides a dynamic scenario re civil construction work; it is thereby essential to have relevant information available for the suitable planning and evaluation of engineering work from both the structural and budgetary points of view. The moisture content of soil has become a most important variable, given its great impact on placing structures in Bogota. This is why this work on city zoning aimed at orientating planning and designing civil engineering work has been done a...

  4. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    International Nuclear Information System (INIS)

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided

  5. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  6. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  7. Integrated load distribution and production planning in series-parallel multi-state systems with failure rate depending on load

    International Nuclear Information System (INIS)

    Nourelfath, Mustapha; Yalaoui, Farouk

    2012-01-01

    A production system containing a set of machines (also called components) arranged according to a series-parallel configuration is addressed. A set of products must be produced in lots on this production system during a specified finite planning horizon. This paper presents a method for integrating load distribution decisions, and tactical production planning considering the costs of capacity change and the costs of unused capacity. The objective is to minimize the sum of capacity change costs, unused capacity costs, setup costs, holding costs, backorder costs, and production costs. The main constraints consist in satisfying the demand for all products over the entire horizon, and in not exceeding available repair resource. The production series-parallel system is modeled as a multi-state system with binary-state components. The proposed model takes into account the dependence of machines' failure rates on their load. Universal generating function technique can be used in the optimization algorithm for evaluating the expected system production rate in each period. We show how the formulated problem can be solved by comparing the results of several multi-product lot-sizing problems with capacity associated costs. The importance of integrating load distribution decisions and production planning is illustrated through numerical examples.

  8. Work plan, AP-102 mixer pump removal and pump replacement

    International Nuclear Information System (INIS)

    Jimenez, R.F.

    1994-01-01

    The objective of this work plan is to plan the steps and estimate the costs required to remove the failed AP-102 mixer pump, and to plan and estimate the cost of the necessary design and specification work required to order a new, but modified, mixer pump including the pump and pump pit energy absorbing design. The main hardware required for the removal of the mixer is as follows: a flexible receiver and blast shield; a metal container for the pulled mixer pump; and a trailer and strongback to haul and manipulate the container. Additionally: a gamma scanning device will be needed to detect the radioactivity emanating from the mixer as it is pulled from the tank; a water spray system will be required to remove tank waste from the surface of the mixer as it is pulled from the AP-102 tank; and a lifting yoke to lift the mixer from the pump pit (the SY-101 Mixer Lifting Yoke will be used). A ''green house'' will have to be erected over the AP-102 pump pit and an experienced Hoisting and Rigging crew must be assembled and trained in mixer pump removal methods before the actual removal is undertaken

  9. Aespoe Hard Rock Laboratory. Planning Report for 2009

    Energy Technology Data Exchange (ETDEWEB)

    2009-02-15

    This report presents the planned activities for the year 2009. The report is revised annually and details the programme carried out in the Aespoe Hard Rock Laboratory as described in SKB's Research, Development and Demonstration Programme 2007, and serves as a basis for the management of the laboratory. The role of the Planning Report is to present the plans and scope of work for each project. Thereby the Status Reports may concentrate on work in progress and refers to this Planning Report for scope of work over the year. Background information on the projects is given in the Annual Report as well as findings and results.

  10. Aespoe Hard Rock Laboratory. Planning Report for 2010

    Energy Technology Data Exchange (ETDEWEB)

    2010-05-15

    This report presents the planned activities for the year 2010. The report is revised annually and details the programme carried out in the Aespoe Hard Rock Laboratory as described in SKB's Research, Development and Demonstration Programme 2007, and serves as a basis for the management of the laboratory. The role of the Planning Report is to present the plans and scope of work for each project. Thereby the Status Reports may concentrate on work in progress and refers to this Planning Report for scope of work over the year. Background information on the projects is given in the Annual Report as well as findings and results

  11. Aespoe Hard Rock Laboratory. Planning Report for 2009

    International Nuclear Information System (INIS)

    2009-02-01

    This report presents the planned activities for the year 2009. The report is revised annually and details the programme carried out in the Aespoe Hard Rock Laboratory as described in SKB's Research, Development and Demonstration Programme 2007, and serves as a basis for the management of the laboratory. The role of the Planning Report is to present the plans and scope of work for each project. Thereby the Status Reports may concentrate on work in progress and refers to this Planning Report for scope of work over the year. Background information on the projects is given in the Annual Report as well as findings and results

  12. Aespoe Hard Rock Laboratory. Planning Report for 2010

    International Nuclear Information System (INIS)

    2010-05-01

    This report presents the planned activities for the year 2010. The report is revised annually and details the programme carried out in the Aespoe Hard Rock Laboratory as described in SKB's Research, Development and Demonstration Programme 2007, and serves as a basis for the management of the laboratory. The role of the Planning Report is to present the plans and scope of work for each project. Thereby the Status Reports may concentrate on work in progress and refers to this Planning Report for scope of work over the year. Background information on the projects is given in the Annual Report as well as findings and results

  13. Incorporating a multi-criteria decision procedure into the combined dynamic programming/production simulation algorithm for generation expansion planning

    International Nuclear Information System (INIS)

    Yang, H.T.; Chen, S.L.

    1989-01-01

    A multi-objective optimization approach to generation expansion planning is presented. The approach is designed by adding a new multi-criteria decision (MCD) procedure to the conventional algorithm which combines dynamic programming with production simulation method. The MCD procedure can help decision makers weight the relative importance of multiple attributes associated with the decision alternatives, and find the near-best compromise solution efficiently at each optimization step of the conventional algorithm. Practical application of proposed approach to feasibility evaluation of the fourth nuclear power plant of Tawian is also presented, demonstrating the effectiveness and limitations of the approach

  14. The importance of work or productive activity in life care planning and case management.

    Science.gov (United States)

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities.

  15. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  16. A working plan for working group 2 'enrichment' within the scope of INFCE

    International Nuclear Information System (INIS)

    1977-01-01

    A working plan for INFCE/WG.2 is presented, outlining the major questions which the group needs to answer under the headings: 1. Enrichment needs and supply, 2. Models for cross-investment, 3. Market situation, 4. Technical and economic assessment of the different enrichment technologies, and 5. Safeguards aspects. It is suggested that the group's assessment should include: 1. Future enrichment capacities, 2. Multinational or regional fuel cycle centres, 3. Possible patterns for guarantees of supply, and 4. Special needs of developing countries

  17. MULTI-YEAR BUDGETING–TOWARDS THE ENHANCEMENT OFFISCAL DISCIPLINE

    Directory of Open Access Journals (Sweden)

    Slawomir Franek

    2012-01-01

    Full Text Available The identification of the reasons for the existing fiscal imbalance shows that it isnecessary tointroducethe institutionalsolutionsof the budgetary process.Thispaper aimsto verify the hypothesis that the application of multi-year budgeting isa factor which increases fiscal discipline and promotes efficiency andtransparency of public finance.Theresearchpresents a comparative analysis ofthe quality of macroeconomic forecasts for EU countries including parameterssuch as the real GDP growth rate, general government sector deficit to GDP ratio,public debt to GDP ratio. Information contained in the EU Stability andConvergence Programmes and in the International Budget Practices andProcedures Database published by the OECD constituted the source of data for theresearch.

  18. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2002-01-01

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  19. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  20. A fuzzy approach to the generation expansion planning problem in a multi-objective environment

    International Nuclear Information System (INIS)

    Abass, S. A.; Massoud, E. M. A.; Abass, S. A.)

    2007-01-01

    In many power system problems, the use of optimization techniques has proved inductive to reducing the costs and losses of the system. A fuzzy multi-objective decision is used for solving power system problems. One of the most important issues in the field of power system engineering is the generation expansion planning problem. In this paper, we use the concepts of membership functions to define a fuzzy decision model for generating an optimal solution for this problem. Solutions obtained by the fuzzy decision theory are always efficient and constitute the best compromise. (author)