WorldWideScience

Sample records for monitoring systems installed

  1. Standard hydrogen monitoring system equipment installation instructions

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, T.C.

    1996-09-27

    This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

  2. Modular Integrated Monitoring System (MIMS) field test installations

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, R.L.; Waymire, D.R. [Sandia National Labs., Albuquerque, NM (United States); Fuess, D.A. [Lawrence Livermore National Lab., CA (United States)] [and others

    1995-07-01

    The MIMS program is funded by the Department of Energy under the Office of Nonproliferation and National Security. The program objective is to develop cost effective, modular, multi-sensor monitoring systems. Both in-plant and ground based sensors are envisioned. It is also desirable to develop sensors/systems that can be fielded/deployed in a rapid fashion. A MIMS architecture was selected to allow modular integration of sensors and systems and is based on LonWorks technology, commercially developed by Echelon Corporation. The first MIMS fieldable hardware was demonstrated at Lawrence Livermore National Laboratory. The field test, known within the DOE as the Item Tracking and Transparency (IT&I) demonstration, involved the collaboration and cooperation of five DOE laboratories (Sandia (SNL), Lawrence Livermore (LLNL), Pacific Northwest (PNL), Los Alamos (LANL), and Oak Ridge (ORNL)). The IT&T demonstration involved the monitoring of special nuclear material as it was transported around the facility utilizing sensors from the participating labs. The scenario was programmed to ignore normal activity in the facility until entry into the room where the material was stored. A second demonstration, which involved three separate scenarios, was conducted at Idaho National Engineering Laboratory (INEL). The participants included representatives from SNL, LLNL, PNL, and INEL. DOE has selected INEL as the long term testbed for MIMS developed sensors, systems, and scenarios. This paper will describe the installation, intended purpose, and results of the field demonstrations at LLNL and INEL under the MIMS program.

  3. Installation and Operation of RENO Slow Control and Online Monitoring System

    CERN Document Server

    Choi, J H; Pac, M Y; Ahn, J K; Choi, S; Choi, Y; Choi, W K; Jang, J S; Jeon, E J; Joo, K K; Kim, H S; Kim, J Y; Kim, S B; Kim, W; Kim, Y D; Lee, J; Lim, I T; Ma, K J; Park, I G; Park, J S; Park, K S; Shin, J W; K, Siyeon; Stepanyan, S S; Yeo, I S; Yu, I

    2013-01-01

    The RENO is the reactor based experiment to measure the smallest neutrino mixing angle, $\\theta_{13}$. The slow control and online monitoring system for RENO monitors the status of the HV systems, the temperatures of the electronics crates and detectors, the fluids levels, humidities of experimental halls and electronics huts, and gas concentrations. And the slow control system is able to set up high voltage for each channel and turn on and off HV remotely. An online monitoring system located in the control room reads data from the DAQ host computer via network. It provides event display, online histograms to monitor detector performance, and variety of additional tasks needed to efficiently monitor detector performance parameters and diagnose troubles of detector and DAQ system. In this paper, we explan the installation of the slow control and monitoring system and their operation status,

  4. Plan for the performance monitoring of solar systems installed by the SUIEDE program: NCAT/SUEDE interaction

    Energy Technology Data Exchange (ETDEWEB)

    Hopkins, M

    1979-02-01

    The SUEDE Grantee solar system installation programs were reviewed to determine the type, number, and quality of Grantee-installed solar systems available for monitoring consideration. An NCAT Performance Monitoring Plan is presented which identifies the service and technical assistance that NCAT will need to provide based on the Grantee review. (MHR)

  5. Development and Testing of a Post-Installable Deepwater Monitoring System Using Fiber-Optic Sensors

    Science.gov (United States)

    Seaman, Calvin H.; Brower, David V.; Le, Suy Q.; Tang, Henry H.

    2015-01-01

    This paper addresses the design and development of a fiber-optic monitoring system that can be deployed on existing deepwater risers and flowlines; and provides a summary of test article fabrication and the subsequent laboratory testing performed at the National Aeronautics and Space Administration-Johnson Space Center (NASA-JSC). A major challenge of a post-installed instrumentation system is to ensure adequate coupling between the instruments and the riser or flowline of interest. This work investigates the sensor coupling for pipelines that are suspended in a water column (from topside platform to seabed) using a fiber-optic sensor clamp and subsea bonding adhesive. The study involved the design, fabrication, and test of several prototype clamps that contained fiber-optic sensors. A mold was produced by NASA using 3-D printing methods that allowed the casting of polyurethane clamp test articles to accommodate 4-inch and 8-inch diameter pipes. The prototype clamps were installed with a subsea adhesive in a "wet" environment and then tested in the NASA Structures Test Laboratory (STL). The tension, compression, and bending test data showed that the prototype sensor clamps achieved good structural coupling, and could provide high quality strain measurement for active monitoring.

  6. Vadose zone monitoring system installation report for McClellan AFB

    Energy Technology Data Exchange (ETDEWEB)

    Zawislanski, P.; Faybishenko, B.; James, A.; Freifeld, B.; Salve, R.

    1996-10-31

    Two vadose zone monitoring systems (VZMS) have been installed at Site S-7, in Investigation Cluster 34 (IC 34), in Operable Unit A (OU A) of McClellan AFB. The two boreholes, VZMS-A and VZMS-B were instrumented at depths ranging from approximately 6 ft to 113 ft. Instruments were installed in clusters using a custom-made stainless steel cage with a spring-loaded mechanism allowing instruments to be in contact with the well bore wall once in place. Each cluster contains a tensiometer, suction lysimeter, soil gas probe and thermistor for measuring hydraulic potential, liquid- and gas-phase pressure, temperature of the formation and for collecting samples for chemical analyses in both the liquid and gas phases. Neutron probe logging is performed in two separate, smaller borings, VZMS-NP-1 and VZMS-NP-2, to obtain soil moisture content data. Preliminary details of soil gas analyses, laboratory field testing of soil samples, particle size analyses and neutron probe data are presented.

  7. Design and installation of a Prototype Geohazard Monitoring System near Machu Picchu, Peru

    Directory of Open Access Journals (Sweden)

    M. H. Bulmer

    2010-09-01

    Full Text Available The town of Machu Picchu, Peru, serves the >700 000 tourists visiting Machu Picchu annually. It has grown threefold in population in the past two decades. Due to the limited low-lying ground, construction is occurring on the unstable valley slopes. Slopes range from <10° on the valley floor to >70° in the surrounding mountains. The town has grown on a delta formed at the confluence of the Alcamayo, Aguas Calientes and Vilcanota Rivers. Geohazards in and around the town of particular concern are 1 large rocks falling onto the town and/or the rail line, 2 flash flooding by any one of its three rivers, and 3 mudflows and landslides. A prototype early warning system that could monitor weather, river flow and slope stability was installed along the Aguas Calientes River in 2009. This has a distributed modular construction allowing components to be installed, maintained, salvaged, and repaired by local technicians. A diverse set of candidate power, communication and sensor technologies was evaluated. Most of the technologies had never been deployed in similar terrain, altitude or weather. The successful deployment of the prototype proved that it is technically feasible to develop early warning capacity in the town.

  8. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ..., oxidation, and galvanic corrosion. (c) For each pressure CPMS that is used to monitor the pressure drop... where it is easily recognized by plant operating personnel. (6) For positive pressure fabric filter... pressure or induced air fabric filters, the bag leak detector must be installed downstream of the...

  9. Monobuoy monitoring system - project, installation and preliminary results; Sistema de monitoracao de monoboias maritimas - desenvolvimento, instalacao e analise preliminar de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Daniel L.; Machado Filho, Remo Z. [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Medeiros Junior, Adory J. [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    A monobuoy monitoring system was developed and installed on 2004 in two oil terminals of TRANSPETRO. The main purpose of this system is to assure that monobuoys will be assisted during offloading operations, which will reduce the risk of accidents and detect immediately damages on mooring lines and equipment. The system comprises a Control Module on terminal site and a Remote Monitoring Unit, installed on each monobuoy. The link between modules is provided by an UHF radio-modem. The parameters acquired are pitch, roll, heave, geographic position, internal variables, and, if available, pressure and temperature of lines, traction on mooring system, etc. Positioning information is processed by the PETRONAV Positioning System. The whole process is registered and monitored on terminal with graphical interface. This article describes the development and installation of the system and the preliminary analysis of data produced since the system was installed. (author)

  10. Gap between technically accurate information and socially appropriate information for structural health monitoring system installed into tall buildings

    Science.gov (United States)

    Mita, Akira

    2016-04-01

    The importance of the structural health monitoring system for tall buildings is now widely recognized by at least structural engineers and managers at large real estate companies to ensure the structural safety immediately after a large earthquake and appeal the quantitative safety of buildings to potential tenants. Some leading real estate companies decided to install the system into all tall buildings. Considering this tendency, a pilot project for the west area of Shinjuku Station supported by the Japan Science and Technology Agency was started by the author team to explore a possibility of using the system to provide safe spaces for commuters and residents. The system was installed into six tall buildings. From our experience, it turned out that viewing only from technological aspects was not sufficient for the system to be accepted and to be really useful. Safe spaces require not only the structural safety but also the soundness of key functions of the building. We need help from social scientists, medical doctors, city planners etc. to further improve the integrity of the system.

  11. Development and Testing of a Friction-Based Post-Installable Fiber-Optic Monitoring System for Subsea Applications

    Science.gov (United States)

    Bentley, Nicole L.; Brower, David V.; Le, Suy Q.; Seaman, Calvin H.; Tang, Henry H.

    2017-01-01

    This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system capable of measuring pressure, strain, and temperature that can be deployed on existing subsea structures. A summary is provided of the design concept, prototype development, prototype performance testing, and subsequent design refinements of the device. The results of laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are also included. Limitations of the initial concept were identified during testing and future design improvements were proposed and later implemented. These new features enhance the coupling of the sensor device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on flowlines, risers, and other subsea structures. The work described in this paper investigates the design and test of a friction-based coupling device (herein referred to as a friction clamp) which is suitable for pipelines and structures that are suspended in the water column as well as for those that are resting on the seabed. The monitoring elements consist of fiberoptic sensors that are bonded to a stainless steel clamshell assembly with a high-friction surface coating. The friction clamp incorporates a single hinge design to facilitate installation of the clamp and dual rows of opposing fasteners to distribute the clamping force along the structure. The friction clamp can be modified to be installed by commercial divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating

  12. 40 CFR 63.3968 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Science.gov (United States)

    2010-07-01

    .... Monitoring failures that are caused in part by poor maintenance or careless operation are not malfunctions... install a device to monitor pressure drop across the zeolite wheel or rotary carbon bed. The pressure... signal simulations or via relative accuracy testing. (v) Conduct an accuracy audit every quarter and...

  13. Development and Testing of a Friction-Based Post-Installable Sensor for Subsea Fiber-Optic Monitoring Systems

    Science.gov (United States)

    Bentley, Nicole; Brower, David; Le, Suy Q.; Seaman, Calvin; Tang, Henry

    2017-01-01

    This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system that can be deployed on existing subsea structures. This paper provides a summary of the design concept, prototype development, prototype performance testing, and design refinements of the device. The results of the laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are included in this paper. Limitations of the initial design were identified and future design improvements were proposed. These new features will enhance the coupling of the device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based coupling devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on subsea structures, flowlines or risers. The work described in this paper investigates the design of a friction-based coupling device (friction clamp), which is applicable for pipelines and structures that are suspended in the water column and those that are resting on the seabed. The monitoring elements consist of fiber-optic sensors that are bonded to a metal clamshell with a high-friction coating. The friction clamp has a single hinge design to facilitate the operation of the clamp and dual rows of opposing fasteners to distribute the clamping force on the structure. The friction clamp can be installed by divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating, and in the design and testing of the prototype clamp device. Four-inch diameter and eight-inch diameter sub-scale friction clamp prototypes were built and tested to evaluate the strain

  14. Development and Testing of a Friction-Based Post-Installable Sensor for Subsea Fiber-Optic Monitoring System

    Science.gov (United States)

    Bentley, Nicole L.; Brower, David V.; Le, Suy Q.; Seaman, Calvin H.; Tang, Henry H.

    2017-01-01

    This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system that can be deployed on existing subsea structures. This paper provides a summary of the design concept, prototype development, prototype performance testing, and design refinements of the device. The results of the laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are included in this paper. Limitations of the initial design were identified and future design improvements were proposed. These new features will enhance the coupling of the device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based coupling devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on subsea structures, flowlines or risers. The work described in this paper investigates the design of a friction-based coupling device (friction clamp), which is applicable for pipelines and structures that are suspended in the water column and those that are resting on the seabed. The monitoring elements consist of fiber-optic sensors that are bonded to a metal clamshell with a high-friction coating. The friction clamp has a single hinge design to facilitate the operation of the clamp and dual rows of opposing fasteners to distribute the clamping force on the structure. The friction clamp can be installed by divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating, and in the design and testing of the prototype clamp device. Four-inch diameter and eight-inch diameter sub-scale friction clamp prototypes were built and tested to evaluate the strain

  15. DEVELOPMENT, INSTALLATION AND OPERATION OF THE MPC&A OPERATIONS MONITORING (MOM) SYSTEM AT THE JOINT INSTITUTE FOR NUCLEAR RESEARCH (JINR) DUBNA, RUSSIA

    Energy Technology Data Exchange (ETDEWEB)

    Kartashov,V.V.; Pratt,W.; Romanov, Y.A.; Samoilov, V.N.; Shestakov, B.A.; Duncan, C.; Brownell, L.; Carbonaro, J.; White, R.M.; Coffing, J.A.

    2009-07-12

    The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Department of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.

  16. 40 CFR 63.4568 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ... caused in part by poor maintenance or careless operation are not malfunctions. Any period for which the... install a device to monitor pressure drop across the zeolite wheel or rotary carbon bed. The pressure... simulations or via relative accuracy testing. (v) Conduct an accuracy audit every quarter and after every...

  17. 14 CFR Appendix D to Part 417 - Flight Termination Systems, Components, Installation, and Monitoring

    Science.gov (United States)

    2010-01-01

    ..., transistor, or diode must satisfy all its performance specifications when subjected to: (i) The sum of ten... single fault tolerant against inadvertent transmission of a safing command under § 417.303(d). D417... each flight termination system battery; (6) Current for each flight termination system battery;...

  18. 40 CFR 63.9306 - What are my continuous parameter monitoring system (CPMS) installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ... provides a representative temperature. (ii) Use a temperature sensor with a measurement sensitivity of 4... temperature chart recorder is used, it must have a measurement sensitivity in the minor division of at least... period of the emission capture system and add-on control device operation. (3) You must record...

  19. Practical aspects of a condition monitoring system for a wind turbine with emphasis on its design, system architecture, testing and installation

    Energy Technology Data Exchange (ETDEWEB)

    Hameed, Z. [School of Mechanical and Aerospace Engineering, Seoul National University, San 56-1 Shinlim-dong, Kwanak-Ro 599, Seoul 151-742 (Korea); Ahn, S.H.; Cho, Y.M. [School of Mechanical and Aerospace Engineering and Institute of Advanced Machinery and Design, Seoul National University, San 56-1 Shinlim-dong, Kwanak-Ro 599, Seoul 151-742 (Korea)

    2010-05-15

    A condition monitoring system (CMS) plays a critical role in tapping the maximum potential of wind energy through wind turbine by minimizing the downtime. It has been proved that the CMS-based maintenance, compared to scheduled and corrective maintenance, is more suitable in many aspects with few disadvantages. The cost of CMS design and installation is substantial in comparison to other maintenance approaches but in the longer run CMS provides benefits surpassing the costs. There are such important parameters as the identification of most sensitive, less sensitive components, replacement costs accompanied with certain components that should be taken into consideration when designing the CMS. In this paper, we have made an attempt to evaluate the viability of CMS, and important parameters in its design, system architecture and installation. The sole purpose is to highlight the overwhelming role of CMS as a better and viable option for increasing the production rate and lowering the downtime in the wind energy converter. (author)

  20. WEBsite of monitoring solar installations; Portal WEB de funcionamiento de instalaciones solares

    Energy Technology Data Exchange (ETDEWEB)

    Lopez, G.; Perez-Solano, M. J.

    2004-07-01

    This article shows an Internet Website of monitoring solar installations. It describes the most interesting characteristics of these installations and includes measures of their working variables. These values are presented in graphics and summarised reports. The solar installations are divided in four groups: Solar Thermal Installations, Domestic Solar Systems, Isolated Photovoltaic Installations and Grid Connected Photovoltaic Installations, however, in this article, the operation and the contents of this Website will be described based on the group of Solar Thermal Installations. This article describes the main page of the website and the necessary procedures to access to an installation, as well as the different screens related to this group. (Author)

  1. Monitoring Groundwater Temperatures in a Shallow Urban Aquifer Before, During and After Installation of a Ground Source Heat System in Cardiff, U.K.

    Science.gov (United States)

    Patton, Ashley M.; Farr, Gareth J.; Boon, David P.; James, David R.; Williams, Bernard; Tucker, David; Harcombe, Gareth

    2016-04-01

    Zone of Seasonal Fluctuation. In addition, six boreholes, including those used for the GSHP, have been telemetered, providing real-time temperature data. The aim of the monitoring network was to establish a baseline for groundwater temperatures in the shallow aquifer and to monitor local changes in temperatures close to the GSHP system. This study aimed to provide understanding of how GSHPs interact with the groundwater in order to confirm the sustainability of groundwater temperatures as a long-term thermal resource and provide planners with knowledge needed to develop sustainable wide-scale GSHP systems/networks. We present temperature data taken before and after installation.

  2. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    Energy Technology Data Exchange (ETDEWEB)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.

  3. 40 CFR 63.3557 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ..., maintain, and operate a flow indicator that takes a reading at least once every 15 minutes. The flow indicator shall be installed at the entrance to any bypass line. (2) Secure the bypass line valve in the nondiverting position with a car-seal or lock-and-key type configuration. A visual inspection of the seal or...

  4. Installation package for a solar heating system

    Science.gov (United States)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  5. 40 CFR 63.4168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL... monitor pressure drop across the zeolite wheel or rotary carbon bed. The pressure monitoring device must... pressure sensor(s) in or as close to a position that provides a representative measurement of the pressure...

  6. Refurbishment and Installation of a Monitoring and Early Warning System on the Sierroz Embankments in Aix-les-Bains, France

    Directory of Open Access Journals (Sweden)

    Courivaud Jean-Robert

    2016-01-01

    Full Text Available Sierroz embankments are located in an urban area, in the city of Aix-les-Bains (Savoie, France. Their linear is 400m on both rims. These embankments protect about 900 people against Sierroz river floods. Hydraulic studies performed in the frame of the Aix-les-Bains Inundation Risk Prevention Plan (PPRI in French have shown that these embankments have a high risk of failure by overtopping during a 100 year return period flood of the Sierroz River. These studies have defined inundation maps with High Danger areas. From these results, the city of Aix-les- Bains asked EDF to perform a safety assessment study, in order to assess the safety margins of these embankments for each of their potential failure modes: overtopping erosion, internal erosion, slope sliding and liquefaction. This study confirmed that the main risk is breaching by overtopping erosion during flood. This diagnosis led the city of Aix-les-Bains to launch two parades: (i the embankment refurbishment in order to provide them satisfactory safety margins during a 100 year return period flood and (ii a monitoring and early-warning system able to alert population at risk as early as possible when breaching is imminent. These two parades are presented including environmental constraints and cost estimates.

  7. 40 CFR 63.4967 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ... calibrated temperature measurement device or by comparing the sensor output to a simulated temperature. (v... comparisons of sensor output to redundant temperature sensors, to calibrated temperature measurement devices... measurement in the duct from each capture device in the emission capture system to the add-on control...

  8. WOVOdat Progress 2012: Installable DB template for Volcano Monitoring Database

    Science.gov (United States)

    Ratdomopurbo, A.; Widiwijayanti, C.; Win, N.-T.-Z.; Chen, L.-D.; Newhall, C.

    2012-04-01

    WOVOdat is the World Organization of Volcano Observatories' (WOVO) Database of Volcanic Unrest. Volcanoes are frequently restless but only a fraction of unrest leads to eruptions. We aim to compile and make the data of historical volcanic unrest available as a reference tool during volcanic crises, for observatory or other user to compare or look for systematic in many unrest episodes, and also provide educational tools for teachers and students on understanding volcanic processes. Furthermore, we promote the use of relational databases for countries that are still planning to develop their own monitoring database. We are now in the process of populating WOVOdat in collaboration with volcano observatories worldwide. Proprietary data remains at the observatories where the data originally from. Therefore, users who wish to use the data for publication or to obtain detail information about the data should directly contact the observatories. To encourage the use of relational database system in volcano observatories with no monitoring database, WOVOdat project is preparing an installable standalone package. This package is freely downloadable through our website (www.wovodat.org), ready to install and serve as database system in the local domain to host various types of volcano monitoring data. The WOVOdat project is now hosted at Earth Observatory of Singapore (Nanyang Technological University). In the current stage of data population, our website supports interaction between WOVOdat developers, observatories, and other partners in building the database, e.g. accessing schematic design, information and documentation, and also data submission. As anticipation of various data formats coming from different observatories, we provide an interactive tools for user to convert their data into standard WOVOdat format file before then able to upload and store in the database system. We are also developing various visualization tools that will be integrated in the system to ease

  9. Implementation of an Automatic System for the Monitoring of Start-up and Operating Regimes of the Cooling Water Installations of a Hydro Generator

    Directory of Open Access Journals (Sweden)

    Ioan Pădureanu

    2015-07-01

    Full Text Available The safe operation of a hydro generator depends on its thermal regime, the basic conditions being that the temperature in the stator winding fall within the limits of the insulation class. As the losses in copper depend on the square current in the stator winding, it is necessary that the cooling water debit should be adapted to the values of these losses, so that the winding temperature falls within the range of the values prescribed in the specifications. This paper presents an efficient solution of commanding and monitoring the water cooling installations of two high-power hydro generators.

  10. Development and installation of a new monitoring system for piping systems in fossil fired power plants; Entwicklung und Einsatz eines modernen Rohrleitungsueberwachungssystems fuer fossil befeuerte Kraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Maile, K. [Staatliche Materialpruefungsanstsalt (MPA), Stuttgart (Germany); Purper, H. [Staatliche Materialpruefungsanstsalt (MPA), Stuttgart (Germany); Rohler, K. [Deutsche Babcock Werke AG, Oberhausen (Germany); Wilson, B. [Babcock Energy Ltd., Renfrew (United Kingdom); Lehmann, H. [Rheinisch-Westfaelischer TUEV, Essen (Germany); Garcia, G. [Empresarios Agrupados, Madrid (Spain); Fernandez, J. [Union Fenosa, Madrid (Spain)

    1994-12-31

    The aim of the project was to produce a calculation method, instrumentation/measurement system and computer algorithms. The research was intended to increase the performance of life limiting components and systems operating at elevated temperatures. The detailed objectives of the project were specified as: 1. To evaluate elastic and inelastic stresses and strains and to assess creep and fatigue damage due to internal pressure, thermal transients and external loads - including dynamic loads - by advanced methods. 2. to determine highly loaded areas of components and systems by a new parametric calculation method and to optimise the load distribution on the components and systems for relevant operating conditions by that new method. 3. to determine thermal stresses in thick walled components by measuring temperatures on the outer surface of the component 4. to determine lifetime-relevant external loads by measuring important variables in systems by new methods and to take action if the measured results are out of specification 5. to record cumulative creep/fatigue damage and to estimate the remanent lifetime of the selected highly loaded areas of components and systems by new advanced lifetime monitoring systems. (orig.)

  11. Prototype solar-heating system - installation manual

    Science.gov (United States)

    1978-01-01

    Manual for prototype solar-heating system gives detailed installation procedures for each of seven subsystems. Procedures for operation and maintenance are also included. It discusses architectural considerations, building construction considerations, and checkout-test procedures.

  12. Solar heating system installed at Troy, Ohio

    Science.gov (United States)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  13. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  14. The Feasibility of Installing and Monitoring an Extensive Green Roof at Purdue University

    OpenAIRE

    2007-01-01

    The Boiler Green Initiative (BGI) is a student-run organization working to improve environmental sustainability at the Purdue University West Lafayette campus. A main goal of BGI's is to install a green roof on an existing building on campus that is being replaced. We discuss the benefits of green roofs, the feasibility of having one installed on the Armory's roof and the various monitoring options we have researched. Flat roofs are especially amenable to the green roof system, so a building ...

  15. CONTROL SYSTEM FEATURES OF MAGNETIC-PULSE INSTALLATION AT UNIPOLAR MODE

    Directory of Open Access Journals (Sweden)

    Dzyubenko, A.

    2012-06-01

    Full Text Available Construction features of monitoring and control system of magnetic pulse installation at work in unipolar mode were detected. Installation control system algorithm at work in multiple repeating mode of discharge pulses is proposed. Description of monitoring and control system structure schemes and their purposes have been conducted.

  16. Solar heating system installed at Stamford, Connecticut

    Science.gov (United States)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  17. Public Address Systems. Specifications - Installation - Operation.

    Science.gov (United States)

    Palmer, Fred M.

    Provisions for public address in new construction of campus buildings (specifications, installations, and operation of public address systems), are discussed in non-technical terms. Consideration is given to microphones, amplifiers, loudspeakers and the placement and operation of various different combinations. (FS)

  18. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must... evaluation procedure in § 63.7187(i) to demonstrate compliance, you must use the information from the...

  19. Safety system status monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, J.R.; Morgenstern, M.H.; Rideout, T.H.; Cowley, P.J.

    1984-03-01

    The Pacific Northwest Laboratory has studied the safety aspects of monitoring the preoperational status of safety systems in nuclear power plants. The goals of the study were to assess for the NRC the effectiveness of current monitoring systems and procedures, to develop near-term guidelines for reducing human errors associated with monitoring safety system status, and to recommend a regulatory position on this issue. A review of safety system status monitoring practices indicated that current systems and procedures do not adequately aid control room operators in monitoring safety system status. This is true even of some systems and procedures installed to meet existing regulatory guidelines (Regulatory Guide 1.47). In consequence, this report suggests acceptance criteria for meeting the functional requirements of an adequate system for monitoring safety system status. Also suggested are near-term guidelines that could reduce the likelihood of human errors in specific, high-priority status monitoring tasks. It is recommended that (1) Regulatory Guide 1.47 be revised to address these acceptance criteria, and (2) the revised Regulatory Guide 1.47 be applied to all plants, including those built since the issuance of the original Regulatory Guide.

  20. Hydrogeology and groundwater quality at monitoring wells installed for the Tunnel and Reservoir Plan System and nearby water-supply wells, Cook County, Illinois, 1995–2013

    Science.gov (United States)

    Kay, Robert T.

    2016-04-04

    Groundwater-quality data collected from 1995 through 2013 from 106 monitoring wells open to the base of the Silurian aquifer surrounding the Tunnel and Reservoir Plan (TARP) System in Cook County, Illinois, were analyzed by the U.S. Geological Survey, in cooperation with the Metropolitan Water Reclamation District of Greater Chicago, to assess the efficacy of the monitoring network and the effects of water movement from the tunnel system to the surrounding aquifer. Groundwater from the Silurian aquifer typically drains to the tunnel system so that analyte concentrations in most of the samples from most of the monitoring wells primarily reflect the concentration of the analyte in the nearby Silurian aquifer. Water quality in the Silurian aquifer is spatially variable because of a variety of natural and non-TARP anthropogenic processes. Therefore, the trends in analyte values at a given well from 1995 through 2013 are primarily a reflection of the spatial variation in the value of the analyte in groundwater within that part of the Silurian aquifer draining to the tunnels. Intermittent drainage of combined sewer flow from the tunnel system to the Silurian aquifer when flow in the tunnel systemis greater than 80 million gallons per day may affect water quality in some nearby monitoring wells. Intermittent drainage of combined sewer flow from the tunnel system to the Silurian aquifer appears to affect the values of electrical conductivity, hardness, sulfate, chloride, dissolved organic carbon, ammonia, and fecal coliform in samples from many wells but typically during less than 5 percent of the sampling events. Drainage of combined sewer flow into the aquifer is most prevalent in the downstream parts of the tunnel systems because of the hydraulic pressures elevated above background values and long residence time of combined sewer flow in those areas. Elevated values of the analytes emplaced during intermittent migration of combined sewer flow into the Silurian aquifer

  1. Renewable energy systems in Mexico: Installation of a hybrid system

    Science.gov (United States)

    Pate, Ronald C.

    1993-05-01

    Sandia has been providing technical leadership on behalf of DOE and CORECT on a working level cooperative program with Mexico on renewable energy (PROCER). As part of this effort, the Sandia Design Assistance Center (DAC) and the solar energy program staff at Instituto de Investigaciones Electricas (IIE) in Cuernavaca, Mexico, recently reached agreement on a framework for mutually beneficial technical collaboration on the monitoring and field evaluation of renewable energy systems in Mexico, particularly village-scale hybrid systems. This trip was made for the purpose of planning the details for the joint installation of a data acquisition system (DAS) on a recently completed PV/Wind/Diesel hybrid system in the village of Xcalac on the Southeast coast of the state of Quintana Roo, Mexico. The DAS installation will be made during the week of March 15, 1993. While in Mexico, discussions were also held with personnel from.the National Autonomous University of Mexico (UNAM) Solar Energy Laboratory and several private sector companies with regard to renewable energy project activities and technical and educational support needs in Mexico.

  2. Installation of a Roof Mounted Photovoltaic System

    Science.gov (United States)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  3. CEM ultrasonic flow monitoring design, installation and certification results at the Salt River Project

    Energy Technology Data Exchange (ETDEWEB)

    Rihs, P.W. [Salt River Project, Saint Johns, AZ (United States). Coronado Generating Station

    1995-12-31

    This presentation will include Salt River Project`s design, installation, experiences and results using ultrasonic flow monitoring equipment for certification of continuous emissions monitoring systems. Flow Monitoring is the newest and has been the most controversial component of CEM systems. Experience in measuring flue gas volumetric flow prior to CEMs was very limited. There are currently three basic techniques used to measure gas flow: (1) thermal sensing using hotwire anemometer or thermal dispersion; (2) differential pressure (pitot tube and annubar); (3) acoustic using ultrasonic transducers. The Salt River Project (SRP) operates a variety of affected generating stations: coal, gas and oil. Ultrasonic flow monitoring technology was chosen for all affected generating stations which the author operates. SRP`s approach and reasoning for choosing ultrasonic systems will be discussed. A review of each generating station`s flow monitoring system will be presented. The presentation will include, but may not be limited to, the following: general facilities, description and schematics; physical installations, plan and section drawings; design considerations; results of flow monitors certification testing; and CEMs Project Manager`s conclusions.

  4. Beam Position and Phase Monitors Characterized and Installed in the LANSCE CCL

    Energy Technology Data Exchange (ETDEWEB)

    Gilpatrick, John D [Los Alamos National Laboratory; Kutac, Vincent G. [Los Alamos National Laboratory; Martinez, Derwin [Los Alamos National Laboratory; McCrady, Rodney C. [Los Alamos National Laboratory; O' Hara, James F. [Los Alamos National Laboratory; Olivas, Felix R. [Los Alamos National Laboratory; Shurter, Robert B. [Los Alamos National Laboratory; Watkins, Heath A. [Los Alamos National Laboratory

    2012-04-11

    The Los Alamos Neutron Science Center - Risk Mitigation Project is in the process of replacing older Coupled-Cavity-Linac (CCL) Beam-Position Monitors (BPMs) with newer Beam Position and Phase Monitors (BPPMs) and their associated electronics and cable plants. In many locations, these older BPMs include a separate Delta-T loop for measuring the beam's central phase and energy. Thirty-one BPPMs have been installed and many have monitored the charged particle beam. The installation of these newer BPPMs is the first step to installing complete BPPM measurement systems. Prior to the installation, a characterization of each BPPM took place. The characterization procedure includes a mechanical inspection, a vacuum testing, and associated electrical tests. The BPPM electrical tests for all four electrodes include contact resistance measurements, Time Domain Reflectometer (TDR) measurements, relative 201.25-MHz phase measurements, and finally a set of position-sensitive mapping measurements were performed which included associated fitting routines. This paper will show these data for a typical characterized BPPM.

  5. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  6. Installation package for a sunspot cascade solar water heating system

    Science.gov (United States)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  7. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  8. Photovoltaic energy systems: Design and installation

    Science.gov (United States)

    Buresch, M.

    The characteristics of solar radiation, the design of solar cells, and the installation of Si solar cell arrays for various applications are described. The discussion is limited to medium-scale photovoltaic systems, from 0.1-100 kW peak output, mounted in fixed flat plate modules, the simplest, most maintenance-free concept. Solar cell functioning principles are outlined, including the parasitic mechanisms which reduce cell efficiency. The magnitude, variations, and distribution of the global solar energy input are quantified. Consideration is given to series and parallel connected solar arrays, and to performance under a variable load. Array protection and failure detection are explored, as are integrated array power conditioning equipment comprising energy storage, voltage regulation, and ac to dc converters. Attention is also devoted to array mounting and matching solar cell systems to load.

  9. Development and installation of Picostrain sensors in structural systems

    Science.gov (United States)

    Sener, Joseph C.; Latta, Bernard M.; Ross, Jimmy D.

    2004-07-01

    The concept of the Picostrain sensor technology is based on a standard, commercially available, electrical cable assembly embedded in pavement or structural members. The concept has been developed through the 1990s and patented by the Idaho Transportation Department (ITD) in 2003. The objective of this new technology is to build an inexpensive, easily installed and maintained sensor system for the purposes of vehicle classification (VC), vehicle identification (VI), weigh-in-motion (WIM), and vehicle tracking (VT) applications along with real-time monitoring and evaluation of structural performance under static and dynamic traffic loading. It is intended, in the future, that these sensors will be further developed to replace curently utilized expensive embedded pavement and structural sensors for ultimate improvement of transportation decision-making and planning. This will also help to document the movement of people and goods along with the evironmental, social, economic and financial parameters with an emphasis on tracking movements in social life for security based upon the use of this durable and reliable transducers. Approximately, 400 sensors have been installed on and in the reinforced concrete structural members of the West Park Center River Crossing Bridge (Bridge) and the Micron Engineering Center (MEC) building (Building) at Boise State University (BSU) in Boise, Idaho, USA, since 1998. These sensors were installed: in bridge pile caps, piers, girders and decks; bridge abutment embankments; building footings, columns, beams, floor slabs; and, have been linked to instrument cabinets on site. These sensors installed structures may now be called "smart" structures since they contain a resident sensing system capable of maintaining a constant watch over the integrity of the structure. These sensing systems will be able to evaluate the applied loads, as well as the static and dynamic response of the structure. This paper introduces and describes the new

  10. AUTONOMOUS WIND POWER INSTALLATIONS AND SYSTEMS

    Directory of Open Access Journals (Sweden)

    Kvitko A. V.

    2015-10-01

    Full Text Available The article shows the main advantages and disadvantages of renewable energy sources. It is shown, that in general, the use of renewable energy in the world has acquired real momentum and stable growth trend. An interesting fact is that the greatest application was currently the most mutable and unstable form of energy - wind. The total global installed capacity of large wind turbines, according to various estimates, is approximately 20 GW. This is because the specific investment in wind power is lower than with most other forms of renewable energy. The article presents features of the design and operation of modern wind power stations. It is shown that when choosing wind power plants and stations we must take into account the following main parameters and factors: the average value of amount of electricity consumed by power consumers on a monthly basis; power generator; uptime in the absence wind or when weak wind. The study shows block-circuit solutions of different options of energy systems made using wind power plants. We have also disclosed prospects of development wind energy and considered the advantages and the features of the choice of the main functional units of wind power stations which will increase the effectiveness of predesign work on the creation of high-performance systems of electrosupply with combined power supply systems based on renewable energy sources

  11. Final Technical Report: Development of Post-Installation Monitoring Capabilities

    Energy Technology Data Exchange (ETDEWEB)

    Polagye, Brian [University of Washington

    2014-03-31

    of the subsea base support structure. In support of these plans, the project team developed and field tested a strobe-illuminated stereooptical camera system suitable for studying near-turbine interactions with marine animals. The camera system underwent short-term field testing at the proposed turbine deployment site and a multi-month endurance test in shallower water to evaluate the effectiveness of biofouling mitigation measures for the optical ports on camera and strobe pressure housings. These tests demonstrated that the camera system is likely to meet the objectives of the near-turbine monitoring plan and operate, without maintenance, for periods of at least three months. The project team also advanced monitoring capabilities related to passive acoustic monitoring of marine mammals and monitoring of tidal currents. These capabilities will be integrated in a recoverable monitoring package that has a single interface point with the OpenHydro turbines, connects to shore power and data via a wet-mate connector, and can be recovered to the surface for maintenance and reconfiguration independent of the turbine. A logical next step would be to integrate these instruments within the package, such that one instrument can trigger the operation of another.

  12. Design and installation package for solar hot water system

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    This report contains the design and installation procedure for the Solar Engineering and Manufacturing Company's solar hot water system. Included are the system performance specifications, system design drawings, hazard analysis and other information necessary to evaluate the design and instal the system.

  13. Installation of the Canadian Muon Cargo Inspection System at CRL

    Science.gov (United States)

    2014-04-01

    Installation of the Canadian Muon Cargo Inspection System at CRL Prepared by: Guy Jonkmans Atomic Energy of Canada Limited Chalk River ON...INSTALLATION OF THE CANADIAN MUON CARGO INSPECTION SYSTEM AT CRL 153-30100-REPT-001 Revision 0 2013/02/19 UNRESTRICTED 2013/02/19 ILLIMITÉ 153...30100-REPT-001 2013/02/19 Report, General Installation of the Canadian Muon Cargo Inspection System at CRL Research and Development 153-30100

  14. Installation package for a solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  15. Analysis of a New Dissipation System for a Solar Cooling Installation

    Directory of Open Access Journals (Sweden)

    Carlos Monné Bailo

    2010-01-01

    Full Text Available This paper describes a solar absorption cooling installation located at the University of Zaragoza (Spain. The installation is based on the performance of an absorption chiller. The solar cooling system consists of 37,5 m2 of flat plate collector, a 4.5 kW, single-effect LiBr-H2O absorption chiller, and a dry cooling tower. The installation provides cooling to a gymnasium belonging to the sports center of the university. To carry out the installation analysis, the system was continuously monitored. In 2007, 2008 and 2009, several studies have been performed in order to analyze the full system operation. The measured data showed the strong influence of the cooling water temperature and the generator driving temperature on the COP. Due to the experimental evidence of the influence of the cooling water temperature, a new heat rejection system based on a geothermal heat sink has been installed and studied.

  16. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  17. 40 CFR 63.2163 - If I monitor fermenter exhaust, what are my monitoring installation, operation, and maintenance...

    Science.gov (United States)

    2010-07-01

    ... Hazardous Air Pollutants: Manufacturing of Nutritional Yeast Testing and Initial Compliance Requirements... are my monitoring installation, operation, and maintenance requirements? 63.2163 Section 63.2163... maintenance requirements? (a) Each CEMS must be installed, operated, and maintained according to the...

  18. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true If I monitor brew ethanol, what are my... monitor brew ethanol, what are my monitoring installation, operation, and maintenance requirements? (a... considered by us to be generally optimum. Use the brew-to-exhaust correlation equation established under §...

  19. Monitoring and Mitigation Alternatives for Protection of North Atlantic Right Whales during Offshore Wind Farm Installation

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Halvorsen, Michele B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Matzner, Shari [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Stavole, Jessica [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2012-09-01

    Progress report on defining and determining monitoring and mitigation measures for protecting North Atlantic Right Whales from the effects of pile driving and other activities associated with installation of offshore wind farms.

  20. The CHAIN-Project and Installation of Flare Monitoring Telescopes in Developing Countries

    Directory of Open Access Journals (Sweden)

    S UeNo

    2009-04-01

    Full Text Available The Flare Monitoring Telescope (FMT was constructed in 1992 at Hida Observatory in Japan to investigate the long-term variation of solar activity and explosive events. It has five solar imaging telescopes that simultaneously observe the full-disk Sun at different wavelengths around the H-alpha absorption line or in different modes. Therefore, the FMT can measure the three-dimensional velocity field of moving structures on the full solar disk. The science target of the FMT is to monitor solar flares and erupting filaments continuously all over the solar disk and to investigate correlation between the characteristics of the erupting phenomena and the geoeffectiveness of the corresponding coronal mass ejections (CMEs. We are planning to start up a new worldwide project, the Continuous H-alpha Imaging Network (CHAIN project, as an important IHY project of our observatories. As part of this project, we are examining the possibility of installing telescopes similar to the FMT in developing countries. We have selected Peru and Algeria as the countries where the first and second overseas FMTs will be installed, and we are aiming to start operation of these FMTs by the end of 2010 before the maximum phase of solar cycle 24. To create such an international network, it will be necessary to improve the information technologies applied in our observation-system. In this paper, we explain the current status and future areas of work regarding our system.

  1. Solar Power Systems Web Monitoring

    CERN Document Server

    Kumar, Bimal Aklesh

    2011-01-01

    All over the world the peak demand load is increasing and the load factor is decreasing year-by-year. The fossil fuel is considered insufficient thus solar energy systems are becoming more and more useful, not only in terms of installation but monitoring of these systems is very crucial. Monitoring becomes very important when there are a large number of solar panels. Monitoring would allow early detection if the output falls below required level or one of the solar panel out of 1000 goes down. In this study the target is to monitor and control a developed solar panel by using available internet foundation. This web-enabled software will provide more flexibility over the system such as transmitting data from panel to the host computer and disseminating information to relevant stake holders barring any geographical barrier. The software would be built around web server with dynamic HTML and JAVA, this paper presents the preliminary design of the proposed system.

  2. Calibration of burnup monitor installed in Rokkasho Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Oeda, Kaoru; Naito, Hirofumi; Hirota, Masanari [Japan Nuclear Fuel Co. Ltd., Rokkasho, Aomori (Japan); Natsume, Koichiro [Isogo Engineering Center, Toshiba Corporation, Yokohama, Kanagawa (Japan); Kumanomido, Hironori [Nuclear Engineering Laboratory, Toshiba Corporation, Kawasaki, Kanagawa (Japan)

    2000-06-01

    Rokkasho Reprocessing Plant uses burnup credit for criticality control at the Spent Fuel Storage Facility (SFSF) and the Dissolution Facility. A burnup monitor measures nondestructively burnup value of a spent fuel assembly and guarantees the credit for burnup. For practical reasons, a standard radiation source is not used in calibration of the burnup monitor, but the burnup values of many spent fuel assemblies are measured based on operator-declared burnup values. This paper describes the concept of burnup credit, the burnup monitor, and the calibration method. It is concluded, from the results of calibration tests, that the calibration method is valid. (author)

  3. Remote monitoring of solar and wind power installation via GSN and Internet; Sistema de telegestion de instalaciones solares y eolicas a traves de GSN e Internet

    Energy Technology Data Exchange (ETDEWEB)

    Caballero, P. M. L.; Valmaseda, J. C. T.; Uruena, H. J. C.; Bujedo, L. A. N.

    2004-07-01

    Remote monitoring of solar and wind power installations is important for installers since some local rules oblige them to keep a maintenance plan, and the installations are normally sparse. It is also important for end users because they demand more information about the system and management capacity each time. In this paper we present CARTIF's development for the company ENERPAL to fulfil these needs. It is formed by two subsystems: one for data acquisition and control of the installations via GSM, and the other, a server software that allows the user to access her installation remotely through the Internet in order to manage it. (Author)

  4. Remote computer monitors corrosion protection system

    Energy Technology Data Exchange (ETDEWEB)

    Kendrick, A.

    Effective corrosion protection with electrochemical methods requires some method of routine monitoring that provides reliable data that is free of human error. A test installation of a remote computer control monitoring system for electrochemical corrosion protection is described. The unit can handle up to six channel inputs. Each channel comprises 3 analog signals and 1 digital. The operation of the system is discussed.

  5. Groundwater quality monitoring well installation for Waste Area Grouping at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Mortimore, J.A.; Lee, T.A.

    1994-09-01

    This report documents the drilling and installation of 18 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 11. WAG 11 (White Wing Scrap Yard) is located on the west end of East Fork Ridge between White Wing Road and the Oak Ridge Turnpike. The scrap yard is approximately 25 acres in size. The wells at WAG 11 were drilled and developed between January 1990 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at WAG 11 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. Detailed procedures for well construction were specified by the Engineering Division to ensure that the wells would provide water samples representative of the aquifer. To ensure conformance with the specifications, Energy Systems Construction Engineering and ERCE provided continuous oversight of field activities. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 11. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents.

  6. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... Composite Wood Products Initial Compliance Requirements § 63.2269 What are my monitoring installation... moisture monitoring. For each furnish or veneer moisture meter, you must meet the requirements in... in the 25 to 35 percent (dry basis) moisture content range. For veneer redryers, use a...

  7. Development of a quality management system for Brazilian nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Kibrit, Eduardo [Centro Tecnologico da Marinha em Sao Paulo (CTMSP), Sao Paulo, SP (Brazil). Dept. da Qualidade]. E-mail: edkibrit@yahoo.com.br; Zouain, Desiree Moraes [Instituto de Pesquisas Energeticas e Nucleares (IPEN), Sao Paulo, SP (Brazil). Div. de Planejamento e Inovacao Tecnologica]. E-mail: dmzouain@ipen.br

    2005-07-01

    The present work is a proposal for developing a quality management system for Brazilian nuclear installations, based on applicable standards. The standard ISO 9001:2000 [4] establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard IAEA 50-C/SG-Q [1] establishes general requirements for the implementation of a quality assurance system in nuclear installations. The standard CNEN-NN- 1.16 [5] establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The revision of standard IAEA 50-C/SG-Q [1], to be replaced by IAEA DS 338 [2] and IAEA DPP 349 [3], introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concept of 'Quality Assurance'. This approach is incorporated with the current tendency, because it guides the system to manage, in an integrated way, the requirements of quality, safety, health, environment, security and economics of the installation. The results of the characterization of the quality management systems established in the applicable standards are presented, with the determination of the common and conflicting points among them. Referring data to quality assurance program/quality management system in some nuclear installations of IAEA Member States are also presented. (author)

  8. Solar heating system installed at Troy, Ohio. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This document is the Final Report of the Solar Energy System located at Troy-Miami County Public Library, Troy, Ohio. The completed system is composed of tree basic subsystems: the collector system consisting of 3264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which includes a 5000-gallon insulated steel tank; and the distribution and control system which includes piping, pumping and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and is, therefore, a retrofit system. This report includes extracts from the site files, specifications, drawings, installation, operation and maintenance instructions.

  9. Solar heating system installed at Lynchburg, VA

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    A detailed design report for a retrofitted solar heating and cooling system for a 1780 square foot office building is presented. The system is composed of a 400 square foot flat plate collector, a 2,000 gallon storage tank, a gas auxiliary boiler, a duct distribution system utilizing a hot water duct coil and water-to-air heat pump, and a hot water preheater. The control system, data acquisition system, technical data, and maintenance procedure are discussed. Detailed specifications, circuits, and drawings for the components are included. (WHK)

  10. Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made.

  11. Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made.

  12. Installation of the Monitoring Site at the Los Alamos Canyon Low-Head Weir

    Energy Technology Data Exchange (ETDEWEB)

    W.J.Stone; D.L.Newell

    2002-08-01

    The Cerro Grande fire of 2000 had an enormously adverse impact on and around Los Alamos National Laboratory (LANL). Immediately there were concerns about the potential for enhanced runoff/offsite transport of contaminant-laden sediments because of watershed damage. In response to this concern, the U.S. Army Corps of Engineers installed a low-head weir in Los Alamos Canyon near the White Rock ''Y.'' However, the occurrence of fractured basalt at the surface and ponding of runoff behind the weir enhance the possibility of downward migration of contaminants. Therefore, three boreholes were drilled on the south bank of the channel by LANL to provide a means of monitoring the impact of the Cerro Grande fire and of the weir on water quality beneath the canyon. The boreholes and associated instrumentation are referred to as the Los Alamos Weir Site (LAWS). The three boreholes include a vertical hole and two angled holes (one at approximately 45{sup o} and one at approximately 30{sup o}). Since the basalt is highly fractured, the holes would not stay open. Plans called for inserting flexible liners into all holes. However, using liners in such unstable ground was problematic and, in the angled holes, required deployment through scalloped or perforated polyvinyl chloride (PVC) shield. The vertical hole (LAWS-01), drilled to a total depth of 281.5 ft below ground surface (bgs), was completed as a 278-ft deep monitoring well with four screens: one targeting shallow perched water encountered at 80 ft, two in what may correspond to the upper perched zone at regional groundwater characterization well R-9i (1/4 mi. to the west), and one in what may correspond to the lower perched zone at R-9i. A Water FLUTe{trademark} system deployed in the well isolates the screened intervals; associated transducers and sampling ports permit monitoring head and water quality in the screened intervals. The second hole (LAWS-02), drilled at an angle of 43{sup o} from horizontal

  13. Solar system installation at Louisville, Kentucky (final report)

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-07

    A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

  14. Inductive Monitoring System (IMS)

    Data.gov (United States)

    National Aeronautics and Space Administration — IMS: Inductive Monitoring System The Inductive Monitoring System (IMS) is a tool that uses a data mining technique called clustering to extract models of normal...

  15. Flight Systems Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR Phase I project will develop the Flight System Monitor which will use non-intrusive electrical monitoring (NEMO). The electronic system health of...

  16. Meeting the challenges of installing a mobile robotic system

    Science.gov (United States)

    Decorte, Celeste

    1994-01-01

    The challenges of integrating a mobile robotic system into an application environment are many. Most problems inherent to installing the mobile robotic system fall into one of three categories: (1) the physical environment - location(s) where, and conditions under which, the mobile robotic system will work; (2) the technological environment - external equipment with which the mobile robotic system will interact; and (3) the human environment - personnel who will operate and interact with the mobile robotic system. The successful integration of a mobile robotic system into these three types of application environment requires more than a good pair of pliers. The tools for this job include: careful planning, accurate measurement data (as-built drawings), complete technical data of systems to be interfaced, sufficient time and attention of key personnel for training on how to operate and program the robot, on-site access during installation, and a thorough understanding and appreciation - by all concerned - of the mobile robotic system's role in the security mission at the site, as well as the machine's capabilities and limitations. Patience, luck, and a sense of humor are also useful tools to keep handy during a mobile robotic system installation. This paper will discuss some specific examples of problems in each of three categories, and explore approaches to solving these problems. The discussion will draw from the author's experience with on-site installations of mobile robotic systems in various applications. Most of the information discussed in this paper has come directly from knowledge learned during installations of Cybermotion's SR2 security robots. A large part of the discussion will apply to any vehicle with a drive system, collision avoidance, and navigation sensors, which is, of course, what makes a vehicle autonomous. And it is with these sensors and a drive system that the installer must become familiar in order to foresee potential trouble areas in the

  17. Rotary feeding system for metallic coating installation by electrodeposition

    Science.gov (United States)

    Stănescu, A.; Alecusan, A. M.; Dimitescu, A.

    2016-08-01

    The paper aims to present an alternative feeding system for metallic coatings lines by electrodeposition which lends itself to the circular arrangement of the cuvettes used in such plants. The novelty lies both, in the arrangement of the electrodeposition installation components and mechanical feeding and transport system for parts to be electrodeposited. The control and actuation system of this type of installation simplifies. Nevertheless, all these increase the system reliability and run lower maintenance costs, without adversely affecting the quality of the end product. The paper presents the justification for reducing the total energy consumption in the electrodeposition process, too.

  18. Long-term monitoring of local stress changes in 67km installed OPGW cable using BOTDA

    Science.gov (United States)

    Zou, L.; Sezerman, O.

    2015-09-01

    The initial results from continuing long-term monitoring of a 67 km of an aerial fiber optic cable installed on a 500 kV power line cable (total fiber length of 134km) using BOTDA are presented. The effects of thunderstorms and rime ice on the cable were identified by monitoring strain on OPGW fibers. Variations of strain between day and night on the OPGW cable were observed and can potentially be exploited.

  19. Installation of Computerized Procedure System and Advanced Alarm System in the Human Systems Simulation Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Le Blanc, Katya Lee [Idaho National Lab. (INL), Idaho Falls, ID (United States); Spielman, Zachary Alexander [Idaho National Lab. (INL), Idaho Falls, ID (United States); Rice, Brandon Charles [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-04-01

    This report describes the installation of two advanced control room technologies, an advanced alarm system and a computerized procedure system, into the Human Systems Simulation Laboratory (HSSL). Installation of these technologies enables future phases of this research by providing a platform to systematically evaluate the effect of these technologies on operator and plant performance.

  20. Photovoltaics for professionals solar electric systems marketing, design and installation

    CERN Document Server

    Falk, Antony; Remmers, Karl-Heinz

    2007-01-01

    For the building industry, the installation of photovoltaic systems has become a new field of activity. Interest in solar energy is growing and future business prospects are excellent. Photovoltaics for Professionals describes the practicalities of marketing, designing and installing photovoltaic systems, both grid-tied and stand-alone. It has been written for electricians, technicians, builders, architects and building engineers who want to get involved in this expanding industry. It answers all the beginner's questions as well as serving as a textbook and work of reference

  1. McClellan PV system installation provides key lessons

    Science.gov (United States)

    Kauffman, W. R.

    Design features and lessons learned in the installation of a 40 kWp solar cell array to supply power to a market on an airbase are outlined. The fixed-position modules interface with an inverter, ac and dc switchgear, controls, instrumentation, and an energy management system. The power control unit has a peak power tracking feature to maximize output from the 1142 cell modules. The inverter has functioned at over 98 percent efficiency near the 25 kW design range of the array. Moisture sealing to prevent ground faults was found necessary during the installation of the underground cabling.

  2. Remote Maintenance Monitoring System -

    Data.gov (United States)

    Department of Transportation — The Remote Maintenance and Monitoring System (RMMS) is a collection of subsystems that includes telecommunication components, hardware, and software, which serve to...

  3. Aerospace Systems Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Proposal Title: Aerospace Systems Monitor PHASE 1 Technical Abstract: This Phase II STTR project will continue development and commercialization of the Aerospace...

  4. PV Systems Installed in Marine Vessels: Technologies and Specifications

    Directory of Open Access Journals (Sweden)

    Ioannis Kobougias

    2013-01-01

    Full Text Available Considerations are held about the specificationin whichthe PV plants have to fulfill so that they can be installed on marine vessels. Initially, a brief description of the typical electrical grid of ships is presented, distinguishing the main parts, reporting the typical electrical magnitudes, and choosing the most preferable installation areas. The technical specifications,in whichthe PV plants have to be compatible with, are fully described. They are determined by the special marine environmental conditions, taking into consideration parameters like wind, humidity, shading, corrosion, and limited installation area. The work is carried out with the presentation of the most popular trends in the field of solar cell types and PV system technologies and their ability to keep up with the aforementioned specifications.

  5. Digital Automation and Real-Time Monitoring of an Original Installation for "Wet Combustion" of Organic Wastes

    Science.gov (United States)

    Morozov, Yegor; Tikhomirov, Alexander A.; Saltykov, Mikhail; Trifonov, Sergey V.; Kudenko, D.. Yurii A.

    2016-07-01

    An original method for "wet combustion" of organic wastes, which is being developed at the IBP SB RAS, is a very promising approach for regeneration of nutrient solutions for plants in future spacecraft closed Bioregenerative Life Support Systems (BLSS). The method is quick, ecofriendly, does not require special conditions such as high pressure and temperature, and the resulting nitrogen stays in forms easy for further preparation of the fertilizer. An experimental testbed of a new-generation closed ecosystem is being currently run at the IBP SB RAS to examine compatibility of the latest technologies for accelerating the cycling. Integration of "wet combustion" of organic wastes into the information system of closed ecosystem experimental testbed has been studied as part of preparatory work. Digital automation and real-time monitoring of original "wet combustion" installation operation parameters have been implemented. The new system enabled remotely controlled or automatic work of the installation. Data are stored in standard easily processed formats, allowing further mathematical processing where necessary. During ongoing experiments on improving "wet combustion" of organic wastes, automatic monitoring can notice slight changes in process parameters and record them in more detail. The ultimate goal of the study is to include the "wet combustion" installation into future full-scale experiment with humans, thus reducing the time spent by the crew on life support issues while living in the BLSS. The work was carried out with the financial support of the Russian Scientific Foundation (project 14-14-00599).

  6. Federal Emergency Management Information System (FEMIS) Installation Guide for FEMIS Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, Robert A.(BATTELLE (PACIFIC NW LAB)); Carter, Richard J.(BATTELLE (PACIFIC NW LAB)); Downing, Timothy R.(BATTELLE (PACIFIC NW LAB)); Dunkle, Julie R.(BATTELLE (PACIFIC NW LAB)); Homer, Brian J.(BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M.(BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L.(BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M.(BATTELLE (PACIFIC NW LAB)); Loveall, Robert M.(BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Wood, Blanche M.(BATTELLE (PACIFIC NW LAB))

    2001-12-01

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS Installation Guide provides instructions for installing and configuring the FEMIS software package.

  7. Acoustic Flow Monitor System - User Manual

    Science.gov (United States)

    LaHusen, Richard

    2005-01-01

    INTRODUCTION The Acoustic Flow Monitor (AFM) is a portable system that was designed by the U.S. Geological Survey Cascades Volcano Observatory to detect and monitor debris flows associated with volcanoes. It has been successfully used internationally as part of real-time warning systems in valleys threatened by such flows (Brantley, 1990; Marcial and others, 1996; Lavigne and others, 2000). The AFM system has also been proven to be an effective tool for monitoring some non-volcanic debris flows. This manual is intended to serve as a basic guide for the installation, testing, and maintenance of AFM systems. An overview of how the system works, as well as instructions for installation and guidelines for testing, is included. Interpretation of data is not covered in this manual; rather, the user should refer to the references provided for published examples of AFM data.

  8. Solar space and water heating system installed at Charlottesville, Virginia

    Science.gov (United States)

    1980-01-01

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, is described. The solar energy system consists of 88 single glazed, Sunworks 'Solector' copper base plate collector modules, hot water coils in the hot air ducts, a Domestic Hot Water (DHW) preheat tank, a 3,000 gallon concrete urethane insulated storage tank and other miscellaneous components. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  9. Solar heating system installed at Jackson, Tennessee. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

  10. Monitoring Cray Cooling Systems

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, Don E [ORNL; Ezell, Matthew A [ORNL; Becklehimer, Jeff [Cray, Inc.; Donovan, Matthew J [ORNL; Layton, Christopher C [ORNL

    2014-01-01

    While sites generally have systems in place to monitor the health of Cray computers themselves, often the cooling systems are ignored until a computer failure requires investigation into the source of the failure. The Liebert XDP units used to cool the Cray XE/XK models as well as the Cray proprietary cooling system used for the Cray XC30 models provide data useful for health monitoring. Unfortunately, this valuable information is often available only to custom solutions not accessible by a center-wide monitoring system or is simply ignored entirely. In this paper, methods and tools used to harvest the monitoring data available are discussed, and the implementation needed to integrate the data into a center-wide monitoring system at the Oak Ridge National Laboratory is provided.

  11. Harassment Monitoring System Using Android Smartphone

    Directory of Open Access Journals (Sweden)

    Shivu Gururaj, Dr. Raj Shekhar M Pati

    2013-09-01

    Full Text Available In this paper we propose a system for monitoring harassment. It is essentially software installed on phone which informs the security (e.g. police and dear ones (e.g. parents with location details and seeking for help message. It posts the same details on server to notify public for help.

  12. System Design and Installation for RS600 Programmable Control System for Solar Heating and Cooling

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-01

    This document contains the installation, operation and maintenance manual, the system design drawings, installation drawings and the system design data brochure. It provides detailed information necessary for the building/ purchase and installation of the RS600 Programmable Control System for solar heating, combined heating and cooling and/ or hot water systems. Included are such item as general specifications, user configuration and options, displays, theory of operation, trouble-shooting procedures, parts lists, drawings, diagrams, wiring lists and warranty assistance.

  13. Installation and Commissioning of the Resonant Frequency Control Cooling System

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Hyeokjung; Seol, Kyungtae; Kim, Hansung; Jang, Jiho; Cho, Yongsub [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    Total 11 sets of Resonant Frequency Control Cooling System (RCCS) are used to control the resonance frequency of the 100-MeV DTL. The specifications of the RCCS are summarized. The RCCS should cover the temperature from 21 .deg. C to 33 .deg. C, heat load from magnet power only to full RF power in addition to the magnet power. The stability of the temperature control is less than 0.1 .deg. C. The control input variable comes from the resonance frequency error from the low level RF (LLRF) system. All RCCSs were installed and tested. In this paper, the installation and initial test results of the RCCS are presented. The standalone test of the RCCS for 100-MeV DTL was carried out. The results showed that the chiller temperature fluctuated above the specification mainly because the chiller controller was not properly tuned, but the RCCS with two independent control valves could be operated to give the required stability.

  14. Monitoring Systems for Hydropower Plants

    Directory of Open Access Journals (Sweden)

    Damaschin Pepa

    2015-07-01

    Full Text Available One of the most important issue in hydro power industry is to determine the necessary degree of automation in order to improve the operation security. Depending upon the complexity of the system (the power plant equipment the automation specialist will build a philosophy of control following some general principals of security and operation. Helped by the modern digital equipment, today is relative easy to design a complete monitoring and supervising system including all the subparts of a hydro aggregate. A series of sensors and transducers specific for each auxiliary installation of the turbine and generator will be provided, together with a PLC or an industrial PC that will run an application software for implementing the security and control algorithms. The purpose of this paper is to offer a general view of these issues, providing a view of designing an automation & control and security system for hydro power plants of small, medium and big power.

  15. Solar space and water heating system installed at Charlottesville, Virginia

    Energy Technology Data Exchange (ETDEWEB)

    Greer, Charles R.

    1980-09-01

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, consists of 88 single glazed, Sunworks Solector copper base plate collector modules; hot water coils in the hot air ducts; a domestic hot water (DHW) preheat tank; a 3,000 gallon concrete urethane-insulated storage tank and other miscellaneous components. This report includes extracts from the site files, specifications, drawings, installation, operation and maintenance instructions.

  16. Slow Monitoring Systems for CUORE

    Science.gov (United States)

    Dutta, Suryabrata; Cuore Collaboration

    2016-09-01

    The Cryogenic Underground Observatory for Rare Events (CUORE) is a ton-scale neutrinoless double-beta decay experiment under construction at the Laboratori Nazionali del Gran Sasso (LNGS). The experiment is comprised of 988 TeO2 bolometric crystals arranged into 19 towers and operated at a temperature of 10 mK. We have developed slow monitoring systems to monitor the cryostat during detector installation, commissioning, data taking, and other crucial phases of the experiment. Our systems use responsive LabVIEW virtual instruments and video streams of the cryostat. We built a website using the Angular, Bootstrap, and MongoDB frameworks to display this data in real-time. The website can also display archival data and send alarms. I will present how we constructed these slow monitoring systems to be robust, accurate, and secure, while maintaining reliable access for the entire collaboration from any platform in order to ensure efficient communications and fast diagnoses of all CUORE systems.

  17. Solar heating and cooling system installed at Columbus, Ohio

    Science.gov (United States)

    1980-01-01

    The Solar Energy System was installed as a part of a new construction of a college building. The building will house classrooms and laboratories, administrative offices and three lecture halls. The Solar Energy System consists of 4,096 square feet (128 panels) Owens/Illinois Evacuated Glass Tube Collector Subsystem, and a 5,000 gallon steel tank below ground storage system. Hot water is circulated between the collectors and storage tank, passing through a water/lithium bromide absorption chiller to cool the building.

  18. New fertilizer-producing system installed at Pad 39A

    Science.gov (United States)

    2000-01-01

    A recently installed fertilizer-producing system sits near Launch Pad 39A. Using a 'scrubber,' the system captures nitrogen tetroxide vapor that develops as a by-product when it is transferred from ground storage tanks into the Shuttle storage tanks. Nitrogen tetroxide is used as the oxidizer for the hypergolic propellant in the Shuttle's on-orbit reaction control system. The scrubber then uses hydrogen peroxide to produce nitric acid, which, after adding potassium hydroxide, converts to potassium nitrate, a commercial fertilizer. Plans call for the resulting fertilizer to be used on the orange groves that KSC leases to outside companies.

  19. Investigation on Prefabricated Building System Skilled Component Installers

    Directory of Open Access Journals (Sweden)

    Nurul Rezuana Buyung

    2013-09-01

    Full Text Available In the face of an increasingly challenging era of globalization, skills and new equipments which includes prefabricated building components, known as Industrialized Building System (IBS has been introduced towards achievement of sustainable construction. IBS is a construction system in which the components are manufactured in a factory, on or off site, positioned and assembled into complete structures with minimal additional site work. IBS requires high construction precision and needs a higher skill level of workers. Compared to the conventional construction method, the skill level of IBS workers is more demanding. Although there are a lot benefits in implementing IBS, the construction industry still not rapidly implementing IBS. The IBS method still considered new and even though there are a lot of benefits it still faces barriers. In an IBS construction, the role of the contractor is shifted from a builder to an assembler on the site. Therefore, this requires the contractor to be prepared technologically with IBS knowledge and skills. It is generally perceived that the number of skilled IBS installers in Malaysia is still low even though the system has been implemented for a long time. This research is carried out to find out whether the existing number of IBS installer is sufficient. Primary data was collected by carrying out interviews with the contractors at the IBS construction site in Penang Island in order to get the contractor’s feedback regarding this issue. Meanwhile, the secondary data was collected from government agencies to get the number of existing IBS installer and the number of IBS projects done in government projects. The results from this study indicated that not all categories of skill workers are in shortage. However, the number of precast concrete installer is in a critical shortage.

  20. Aerospace Systems Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase I STTR project will demonstrate the Aerospace System Monitor (ASM). This technology transforms the power distribution network in a spacecraft or aircraft...

  1. Optimization of electrical supply systems of oil production installations

    Energy Technology Data Exchange (ETDEWEB)

    Nissenbaum, I.A.; Novoselov, Yu.B.; Tsekhnov, A.N.

    1979-01-01

    The problem of optimization of electrical system assumes determination of the method for constructing the system, the functioning of which would assure minimal values of the technical-economic criterion -- costs, which are the basic economic factor in construction and exploitation of the system. When designing electro-supply systems for oil production installations, in particular, the pump stations, three principal versions of the optimization problem are possible, which are determined by the different conditions of the system, the type of minimizing criteria and volume of optimizing parameters. The most difficult optimization of an electrical system is when it is characterized only by assumed values of active power flow, which are determined by the specific energy requirements of the planned technological processes and the type of equipment used. Second, the more common optimization problem is improvement of the existing electrical network, with established processes and equipment use. The third version is a developing system, in which as a result of introduction of new technological installations, or remodeling of old ones, and which may result in a sharp change or re-distribution of the active power supply. Determining operating regimen of the system and optimization of economic-technical criteria should be a result of large-scale calculation and simulation using a digital computer, and use of iteration and non-linear programming methods.

  2. IMIS: Integrated Marine Installation System for offshore turbines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The report describes a feasibility study on the Integrated Marine Installation System for offshore wind turbines. The aspects covered are (1) Background and why the study is required; (2) Aims and objectives of the project; (3) Summary of methods adopted; (4) Design criteria according to the area for deployment; (5) Conclusions and recommendations. The ultimate goal will be to install and secure the wind turbine in position using an integrated approach to avoid using lifting vessels. To date, an initial feasibility study has been carried out where four different concepts were considered. The next phase of the project will be to address a number of possible risks and constraints before the chosen concept can be demonstrated to be viable. The work is being carried out by Setech Ltd, Armstrong Technology Associates Ltd and Smith Rea Energy Ltd for the DTI.

  3. Measurement-Based Evaluation of Installed Filtration System Performance in Single-Family Homes

    Energy Technology Data Exchange (ETDEWEB)

    Chan, Wanyu Rengie; Singer, Brett C.

    2014-04-03

    This guide discusses important study design issues to consider when conducting an on-site evaluation of filtration system performance. The two most important dichotomies to consider in developing a study protocol are (1) whether systems are being evaluated in occupied or unoccupied homes and (2) whether different systems are being compared in the same homes or if the comparison is between systems installed in different homes. This document provides perspective and recommendations about a suite of implementation issues including the choice of particle measurement devices, selection of sampling locations, ways to control and/or monitor factors and processes that can impact particle concentrations, and data analysis approaches.

  4. Solar heating and hot water system installed at Listerhill, Alabama

    Science.gov (United States)

    1978-01-01

    The Solar system was installed into a new building and was designed to provide 79% of the estimated annual space heating load and 59% of the estimated annual potable hot water requirement. The collectors are flat plate, liquid manufactured by Reynolds Metals Company and cover a total area of 2344 square feet. The storage medium is water inhibited with NALCO 2755 and the container is an underground, unpressurized steel tank with a capacity of 5000 gallons. This report describes in considerable detail the solar heating facility and contains detailed drawings of the completed system.

  5. Solar heating and hot water system installed at Listerhill, Alabama

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    The solar system was installed into a new buildng and was designed to provide 79% of the estimated annual space heating load and 59% of the estimated annual potable hot water requirement. The collectors are flat plate, liquid manufactured by Reynolds Metals Company and cover a total area of 2344 square feet. The storage medium is water inhibited with NALCO 2755 and the container is an underground, unpressurized steel tank with a capacity of 5000 gallons. This final report describes in considerable detail the solar heating facility and contains detailed drawings of the completed system.

  6. Solar heating and hot water system installed at Listerhill, Alabama

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    The solar system was installed into a new buildng and was designed to provide 79% of the estimated annual space heating load and 59% of the estimated annual potable hot water requirement. The collectors are flat plate, liquid manufactured by Reynolds Metals Company and cover a total area of 2344 square feet. The storage medium is water inhibited with NALCO 2755 and the container is an underground, unpressurized steel tank with a capacity of 5000 gallons. This final report describes in considerable detail the solar heating facility and contains detailed drawings of the completed system.

  7. Remote monitoring system workshop and technical cooperation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Soo; Kwack, E. H.; Yoon, W. K.; Kim, J. S.; Cha, H. Y.; Na, W.W

    2000-06-01

    RMS workshop at the year focus on installing the material monioring system at technology lab. within TCNC. This system was developed by cooperative monitoring center(CMC) belonging to Sandia national lab. MMS consisted of data storage computer, data collection computer and easily connet to DCM-14 camera using monitoring the NPP by IAEA. The system run when the motion is catching and stroes the event data to MMS server. Also, the system communicate with the internet and then they access to check the event data only if the authencated person.

  8. Submarine-Installed Machinery Monitoring and Diagnostics: A State-of-the-Art Review

    Science.gov (United States)

    1991-08-01

    of automated system in use at the Paducah Gaseous Diffusion Plant . The system continuously monitors the plant and when an alarm condition is sensed...and Strunk, W.D., "On-line Vibration Monitoring and Analysis System at the Paducah Gaseous Diffusion Plant ," Proceedings of the 6th International Modal...ignored. In the process of conducting research of these programs, several plant engineers told stories of how they found condition monitoring equipment

  9. Copilot: Monitoring Embedded Systems

    Science.gov (United States)

    Pike, Lee; Wegmann, Nis; Niller, Sebastian; Goodloe, Alwyn

    2012-01-01

    Runtime verification (RV) is a natural fit for ultra-critical systems, where correctness is imperative. In ultra-critical systems, even if the software is fault-free, because of the inherent unreliability of commodity hardware and the adversity of operational environments, processing units (and their hosted software) are replicated, and fault-tolerant algorithms are used to compare the outputs. We investigate both software monitoring in distributed fault-tolerant systems, as well as implementing fault-tolerance mechanisms using RV techniques. We describe the Copilot language and compiler, specifically designed for generating monitors for distributed, hard real-time systems. We also describe two case-studies in which we generated Copilot monitors in avionics systems.

  10. 40 CFR 257.22 - Ground-water monitoring systems.

    Science.gov (United States)

    2010-07-01

    ... operator. When physical obstacles preclude installation of ground-water monitoring wells at the relevant... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Ground-water monitoring systems. 257... Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.22 Ground-water......

  11. 40 CFR 258.51 - Ground-water monitoring systems.

    Science.gov (United States)

    2010-07-01

    ... preclude installation of ground-water monitoring wells at the relevant point of compliance at existing... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Ground-water monitoring systems. 258... CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.51...

  12. Wiring systems and fault finding for installation electricians

    CERN Document Server

    Scaddan, Brian

    2012-01-01

    This book deals with an area of practice that many students and non-electricians find particularly challenging. It explains how to interpret circuit diagrams, wiring systems, and outlines the principles of testing before explaining how to apply this knowledge to fault finding in electrical circuits. A handy pocket guide for anybody that needs to be able to trace faults in circuits, whether in domestic, commercial or industrial settings, this book will be extremely useful to electricians, plumbers, heating engineers and intruder alarm installers.

  13. VME system monitor board

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Much of the machinery throughout the APS will be controlled by VME based computers. In order to increase the reliability of the system, it is necessary to be able to monitor the status of each VME crate. In order to do this, a VME System Monitor was created. In addition to being able to monitor and report the status (watchdog timer, temperature, CPU (Motorola MVME 167) state (status, run, fail), and the power supply), it includes provisions to remotely reset the CPU and VME crate, digital I/O, and parts of the transition module (serial port and ethernet connector) so that the Motorla MVME 712 is not needed. The standard VME interface was modified on the System Monitor so that in conjunction with the Motorola MVME 167 a message based VXI interrupt handler could is implemented. The System Monitor is a single VME card (6U). It utilizes both the front panel and the P2 connector for I/O. The front panel contains a temperature monitor, watchdog status LED, 4 general status LEDs, input for a TTL interrupt, 8 binary inputs (24 volt, 5 volt, and dry contact sense), 4 binary outputs (dry contact, TTL, and 100 mA), serial port (electrical RS-232 or fiber optic), ethernet transceiver (10 BASE-FO or AUI), and a status link to neighbor crates. The P2 connector is used to provide the serial port and ethernet to the processor. In order to abort and read the status of the CPU, a jumper cable must be connected between the CPU and the System Monitor.

  14. Design and Installation of a Groundwater Monitoring-Well Network in the High Plains Aquifer, Colorado

    Science.gov (United States)

    Arnold, L.R.; Flynn, J.L.; Paschke, S.S.

    2009-01-01

    The High Plains aquifer is an important water source for irrigated agriculture and domestic supplies in northeastern Colorado. To address the needs of Colorado's Groundwater Protection Program, the U.S. Geological Survey designed and installed a groundwater monitoring-well network in cooperation with the Colorado Department of Agriculture in 2008 to characterize water quality in the High Plains aquifer underlying areas of irrigated agriculture in eastern Colorado. A 30-well network was designed to provide for statistical representation of water-quality conditions by using a computerized technique to generate randomly distributed potential groundwater sampling sites based on aquifer extent, extent of irrigated agricultural land, depth to water from land surface, and saturated thickness. Twenty of the 30 sites were selected for well installation, and wells were drilled and installed during the period June-September 2008. Lithologic logs and well-construction reports were prepared for each well, and wells were developed after drilling to remove mud and foreign material to provide for good hydraulic connection between the well and aquifer. Documentation of the well-network design, site selection, lithologic logs, well-construction diagrams, and well-development records is presented in this report.

  15. Nekton Interaction Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    2017-03-15

    The software provides a real-time processing system for sonar to detect and track animals, and to extract water column biomass statistics in order to facilitate continuous monitoring of an underwater environment. The Nekton Interaction Monitoring System (NIMS) extracts and archives tracking and backscatter statistics data from a real-time stream of data from a sonar device. NIMS also sends real-time tracking messages over the network that can be used by other systems to generate other metrics or to trigger instruments such as an optical video camera. A web-based user interface provides remote monitoring and control. NIMS currently supports three popular sonar devices: M3 multi-beam sonar (Kongsberg), EK60 split-beam echo-sounder (Simrad) and BlueView acoustic camera (Teledyne).

  16. Wearable Health Monitoring Systems

    Science.gov (United States)

    Bell, John

    2015-01-01

    The shrinking size and weight of electronic circuitry has given rise to a new generation of smart clothing that enables biological data to be measured and transmitted. As the variation in the number and type of deployable devices and sensors increases, technology must allow their seamless integration so they can be electrically powered, operated, and recharged over a digital pathway. Nyx Illuminated Clothing Company has developed a lightweight health monitoring system that integrates medical sensors, electrodes, electrical connections, circuits, and a power supply into a single wearable assembly. The system is comfortable, bendable in three dimensions, durable, waterproof, and washable. The innovation will allow astronaut health monitoring in a variety of real-time scenarios, with data stored in digital memory for later use in a medical database. Potential commercial uses are numerous, as the technology enables medical personnel to noninvasively monitor patient vital signs in a multitude of health care settings and applications.

  17. Vehicle chassis monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Pisu, P.; Soliman, A.; Rizzoni, G. [Ohio State Univ., Columbus (United States). Center for Automotive Research

    2001-07-01

    Fault detection and isolation is becoming one of the most important aspects in vehicle control system design. In order to achieve this FDI schemes, particular vehicle subsystems integrated with a controller have been proposed. This paper introduces a new model-based fault detection and fault diagnosis method for monitoring the vehicle chassis performance. (orig.)

  18. Safety of Hydrogen Systems Installed in Outdoor Enclosures

    Energy Technology Data Exchange (ETDEWEB)

    Barilo, Nick F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-11-01

    The Hydrogen Safety Panel brings a broad cross-section of expertise from the industrial, government, and academic sectors to help advise the U.S. Department of Energy’s (DOE) Fuel Cell Technologies Office through its work in hydrogen safety, codes, and standards. The Panel’s initiatives in reviewing safety plans, conducting safety evaluations, identifying safety-related technical data gaps, and supporting safety knowledge tools and databases cover the gamut from research and development to demonstration and deployment. The Panel’s recent work has focused on the safe deployment of hydrogen and fuel cell systems in support of DOE efforts to accelerate fuel cell commercialization in early market applications: vehicle refueling, material handling equipment, backup power for warehouses and telecommunication sites, and portable power devices. This paper resulted from observations and considerations stemming from the Panel’s work on early market applications. This paper focuses on hydrogen system components that are installed in outdoor enclosures. These enclosures might alternatively be called “cabinets,” but for simplicity, they are all referred to as “enclosures” in this paper. These enclosures can provide a space where a flammable mixture of hydrogen and air might accumulate, creating the potential for a fire or explosion should an ignition occur. If the enclosure is large enough for a person to enter, and ventilation is inadequate, the hydrogen concentration could be high enough to asphyxiate a person who entered the space. Manufacturers, users, and government authorities rely on requirements described in codes to guide safe design and installation of such systems. Except for small enclosures used for hydrogen gas cylinders (gas cabinets), fuel cell power systems, and the enclosures that most people would describe as buildings, there are no hydrogen safety requirements for these enclosures, leaving gaps that must be addressed. This paper proposes that

  19. B190 computer controlled radiation monitoring and safety interlock system

    Energy Technology Data Exchange (ETDEWEB)

    Espinosa, D L; Fields, W F; Gittins, D E; Roberts, M L

    1998-08-01

    The Center for Accelerator Mass Spectrometry (CAMS) in the Earth and Environmental Sciences Directorate at Lawrence Livermore National Laboratory (LLNL) operates two accelerators and is in the process of installing two new additional accelerators in support of a variety of basic and applied measurement programs. To monitor the radiation environment in the facility in which these accelerators are located and to terminate accelerator operations if predetermined radiation levels are exceeded, an updated computer controlled radiation monitoring system has been installed. This new system also monitors various machine safety interlocks and again terminates accelerator operations if machine interlocks are broken. This new system replaces an older system that was originally installed in 1988. This paper describes the updated B190 computer controlled radiation monitoring and safety interlock system.

  20. Woking Park PAFC CHP monitoring. Phase 1: Planning, installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Goulding, P.S.; Fry, M.R.

    2003-07-01

    This report covers the planning, installation and commissioning of the first commercially operated fuel cell cogeneration system in the UK. The involvement of Woking Borough Council, its approach to energy efficiency, and the Woking Park site are discussed, and details are given of the PC25/C 200kW fuel cell which is manufactured in the US by UTC Fuel Cells. A description of the Woking Park fuel cell combined heat and power application is presented, and the project economics, specification and tendering are examined. The route taken to planning approval is traced, and installation procedures are outlined. The testing of the phosphoric type PC25 fuel cell cogeneration unit is described, and expected cost and project timescales are noted.

  1. Inductive System Monitors Tasks

    Science.gov (United States)

    2008-01-01

    The Inductive Monitoring System (IMS) software developed at Ames Research Center uses artificial intelligence and data mining techniques to build system-monitoring knowledge bases from archived or simulated sensor data. This information is then used to detect unusual or anomalous behavior that may indicate an impending system failure. Currently helping analyze data from systems that help fly and maintain the space shuttle and the International Space Station (ISS), the IMS has also been employed by data classes are then used to build a monitoring knowledge base. In real time, IMS performs monitoring functions: determining and displaying the degree of deviation from nominal performance. IMS trend analyses can detect conditions that may indicate a failure or required system maintenance. The development of IMS was motivated by the difficulty of producing detailed diagnostic models of some system components due to complexity or unavailability of design information. Successful applications have ranged from real-time monitoring of aircraft engine and control systems to anomaly detection in space shuttle and ISS data. IMS was used on shuttle missions STS-121, STS-115, and STS-116 to search the Wing Leading Edge Impact Detection System (WLEIDS) data for signs of possible damaging impacts during launch. It independently verified findings of the WLEIDS Mission Evaluation Room (MER) analysts and indicated additional points of interest that were subsequently investigated by the MER team. In support of the Exploration Systems Mission Directorate, IMS is being deployed as an anomaly detection tool on ISS mission control consoles in the Johnson Space Center Mission Operations Directorate. IMS has been trained to detect faults in the ISS Control Moment Gyroscope (CMG) systems. In laboratory tests, it has already detected several minor anomalies in real-time CMG data. When tested on archived data, IMS was able to detect precursors of the CMG1 failure nearly 15 hours in advance of

  2. Solar, Install, Mount, Production, Labor, Equipment Balance of Systems

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Al-Haddad, Tristan [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Valdes, Francisco [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Caravati, Kevin [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Goodman, Joseph [Georgia Tech Applied Research Corporation, Atlanta, GA (United States)

    2015-08-27

    The GTRI led project team in partnership with the DOE, universities, and numerous industry leaders, have advanced the mission of the DOE EERE, the Solar Energy Technologies Program, and the SunShot Initiative by accelerating the research, development, and demonstration of solar PV technologies that provide Extreme Balance of Systems Cost Reductions (BOS-X). The research produced 132 design concepts, resulting in 19 invention disclosures, five patent applications, four 90% pre-commercial designs, and three licensed technologies. Technology practice rights were obtained by an industry partner, and a new solar commercial start-up company was launched in Atlanta as a result of this project. Innovations in residential, commercial, and utility scale balance of systems technologies were realized through an unprecedented multi-disciplinary university/industry partnership with over 50 students and 24 faculty members that produced 18 technical publications, a PhD thesis, and two commercially deployed operating prototypes. The technical effectiveness and economic feasibility of the multidisciplinary systems based approach executed by the project team was realized through 1) a comprehensive evaluation of industry, regulatory, and public stakeholder requirements; 2) numerous industry/student/faculty engagements in design studios, technical conferences, and at solar PV installation sites; 3) time and motion studies with domain experts that provided technical data and costs for each phase and component of the solar PV installation processes; 4) extensive wind tunnel and systems engineering modeling; and 5) design, construction, and demonstration of the selected technologies in the field at high profile sites in Atlanta. The SIMPLE BOS project has benefitted the public in the following ways: • Workforce development: The launch of a start-up company to commercialize the DOE funded SIMPLE BoS designs has directly created 9 new jobs in the State of Georgia. As of November 2014, the

  3. The continuous automatic monitoring network installed in Tuscany (Italy) since late 2002, to study earthquake precursory phenomena

    Science.gov (United States)

    Pierotti, Lisa; Cioni, Roberto

    2010-05-01

    Since late 2002, a continuous automatic monitoring network (CAMN) was designed, built and installed in Tuscany (Italy), in order to investigate and define the geochemical response of the aquifers to the local seismic activity. The purpose of the investigation was to identify eventual earthquake precursors. The CAMN is constituted by two groups of five measurement stations each. A first group has been installed in the Serchio and Magra graben (Garfagnana and Lunigiana Valleys, Northern Tuscany), while the second one, in the area of Mt. Amiata (Southern Tuscany), an extinct volcano. Garfagnana, Lunigiana and Mt. Amiata regions belong to the inner zone of the Northern Apennine fold-and-thrust belt. This zone has been involved in the post-collision extensional tectonics since the Upper Miocene-Pliocene. Such tectonic activity has produced horst and graben structures oriented from N-S to NW-SE that are transferred by NE-SW system. Both Garfagnana (Serchio graben) and Lunigiana (Magra graben) belong to the most inner sector of the belt where the seismic sources, responsible for the strongest earthquakes of the northern Apennine, are located (e.g. the M=6.5 earthquake of September 1920). The extensional processes in southern Tuscany have been accompanied by magmatic activity since the Upper Miocene, developing effusive and intrusive products traditionally attributed to the so-called Tuscan Magmatic Province. Mt. Amiata, whose magmatic activity ceased about 0.3 M.y. ago, belongs to the extensive Tyrrhenian sector that is characterized by high heat flow and crustal thinning. The whole zone is characterized by wide-spread but moderate seismicity (the maximum recorded magnitude has been 5.1 with epicentre in Piancastagnaio, 1919). The extensional regime in both the Garfagnana-Lunigiana and Mt. Amiata area is confirmed by the focal mechanisms of recent earthquakes. An essential phase of the monitoring activities has been the selection of suitable sites for the installation of

  4. CERN GSM monitoring system

    CERN Multimedia

    Ghabrous Larrea, C

    2009-01-01

    As a result of the tremendous development of GSM services over the last years, the number of related services used by organizations has drastically increased. Therefore, monitoring GSM services is becoming a business critical issue in order to be able to react appropriately in case of incident. In order to provide with GSM coverage all the CERN underground facilities, more than 50 km of leaky feeder cable have been deployed. This infrastructure is also used to propagate VHF radio signals for the CERN’s fire brigade. Even though CERN’s mobile operator monitors the network, it cannot guarantee the availability of GSM services, and for sure not VHF services, where signals are carried by the leaky feeder cable. So, a global monitoring system has become critical to CERN. In addition, monitoring this infrastructure will allow to characterize its behaviour over time, especially with LHC operation. Given that commercial solutions were not yet mature, CERN developed a system based on GSM probes and an application...

  5. Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.

    Energy Technology Data Exchange (ETDEWEB)

    Lum, Clinton C. L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-05-01

    This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Work Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.

  6. The unrest of the San Miguel volcano (El Salvador, Central America): installation of the monitoring network and observed volcano-tectonic ground deformation

    Science.gov (United States)

    Bonforte, Alessandro; Hernandez, Douglas Antonio; Gutiérrez, Eduardo; Handal, Louis; Polío, Cecilia; Rapisarda, Salvatore; Scarlato, Piergiorgio

    2016-08-01

    On 29 December 2013, the Chaparrastique volcano in El Salvador, close to the town of San Miguel, erupted suddenly with explosive force, forming a column more than 9 km high and projecting ballistic projectiles as far as 3 km away. Pyroclastic density currents flowed to the north-northwest side of the volcano, while tephras were dispersed northwest and north-northeast. This sudden eruption prompted the local Ministry of Environment to request cooperation with Italian scientists in order to improve the monitoring of the volcano during this unrest. A joint force, made up of an Italian team from the Istituto Nazionale di Geofisica e Vulcanologia and a local team from the Ministerio de Medio Ambiente y Recursos Naturales, was organized to enhance the volcanological, geophysical and geochemical monitoring system to study the evolution of the phenomenon during the crisis. The joint team quickly installed a multiparametric mobile network comprising seismic, geodetic and geochemical sensors (designed to cover all the volcano flanks from the lowest to the highest possible altitudes) and a thermal camera. To simplify the logistics for a rapid installation and for security reasons, some sensors were colocated into multiparametric stations. Here, we describe the prompt design and installation of the geodetic monitoring network, the processing and results. The installation of a new ground deformation network can be considered an important result by itself, while the detection of some crucial deforming areas is very significant information, useful for dealing with future threats and for further studies on this poorly monitored volcano.

  7. Environmental Baseline Survey for Installation of Five New Hydrogeologic Groundwater Monitoring Wells

    Energy Technology Data Exchange (ETDEWEB)

    Catechis, Christopher S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    This Phase I Environmental Baseline Survey (EBS) provides the findings of a survey and assessment for termination of an existing easement granted to the Department of Energy (DOE) for the installation of 5 new hydrogeologic groundwater monitoring wells located on KAFB, New Mexico. The purpose of this EBS is to: Document the nature, magnitude, and extent of any environmental contamination of the property. Identify potential environmental contamination liabilities associated with the property. Develop sufficient information to assess the health and safety risks. Ensure adequate protection for human health and the environment related to a specific property. Determine possible effects of contamination on property valuation, and serve as the basis for notice of environmental condition for applicable federal or local real property disclosure requirements.

  8. LED system performance in a trial installation - one year later: Yuma border patrol, Yuma, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    Wilkerson, Andrea M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Davis, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-04-01

    The Yuma Sector Border Patrol Area is a high temperature and high solar radiation environment, providing an opportunity for the U.S. Department of Energy (DOE) to study thermal effects on outdoor light-emitting diode (LED) luminaires outside of the testing laboratory. Six LED luminaires were installed on three poles on the U.S.- Mexico border in February 2014 as part of a trial installation, which was detailed in a prior GATEWAY report.1 The initial trial installation was intended as a short - term test of six luminaires installed on three poles before proceeding with the complete installation of over 400 luminaires. Unexpected delays in the full installation have prevented the detailed evaluations initially planned, but the six installed LED luminaires continue to be monitored, and over the past year illuminance measurements were recorded initially in February 2014 and again in September 2014 at about 2500 hours of operation and in March 2015 at about 5000 hours of operation.

  9. Solar heating system installed at Stamford, CT. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    Information is provided on the solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut. The information consists of description of system and components, operation and maintenance manual, as-built drawings and manufacturer's component data. The solar system was designed to provide approximately 50 percent of the heating requirements. The solar facility has 2,561 sq. ft. of liquid flat plate collectors and a 6000 gallon, stone lined, well-insulated storage tank. Freeze protection is provided by a 50 percent glycol/water mixture in the collector loop. From the storage tank, solar heated water is fed into the building's distributed heat pump loop via a modulating three-way valve. If the storage tank temperature drops below 80/sup 0/F, the building loop may be supplied from the existing electrical hot water boilers. The Executive East Office Building is of moderate size, 25,000 sq. ft. of heated space in 2 1/2 stories. The solar system makes available for other users up to 150 KVA of existing electrical generating capacity.

  10. Installation package for a domestic solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    The installation of two prototype solar heating and hot water systems is described. The systems consists of the following subsystems: solar collector, storage, control, transport, and auxiliary energy.

  11. Measures and control: which mandatory regulations? which monitoring system to implement? what results to expect? which relations with the administration?; Mesures et controle: quelles obligations reglementaires? quel systeme de surveillance installer? quels resultats en attendre? quels rapports avec l`administration?

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This workshop is composed of 7 papers on air pollution monitoring and control related to combustion plants and systems: after a presentation of the regulatory framework (at the French and European levels) concerning air pollution and combustion systems, the mechanisms for a clean and efficient combustion are detailed, followed by measures for a quality combustion, pollution emission reduction techniques during combustion, air pollution monitoring and monitors for environment and pollution sources, quality assessment of monitoring systems, automatic monitoring and control of systems and relations with the administration

  12. Earth System Monitoring, Introduction

    Science.gov (United States)

    Orcutt, John

    This section provides sensing and data collection methodologies, as well as an understanding of Earth's climate parameters and natural and man-made phenomena, to support a scientific assessment of the Earth system as a whole, and its response to natural and human-induced changes. The coverage ranges from climate change factors and extreme weather and fires to oil spill tracking and volcanic eruptions. This serves as a basis to enable improved prediction and response to climate change, weather, and natural hazards as well as dissemination of the data and conclusions. The data collection systems include satellite remote sensing, aerial surveys, and land- and ocean-based monitoring stations. Our objective in this treatise is to provide a significant portion of the scientific and engineering basis of Earth system monitoring and to provide this in 17 detailed articles or chapters written at a level for use by university students through practicing professionals. The reader is also directed to the closely related sections on Ecological Systems, Introduction and also Climate Change Modeling Methodology, Introduction as well as Climate Change Remediation, Introduction to. For ease of use by students, each article begins with a glossary of terms, while at an average length of 25 print pages each, sufficient detail is presented for use by professionals in government, universities, and industries. The chapters are individually summarized below.

  13. Induced Seismicity Monitoring System

    Science.gov (United States)

    Taylor, S. R.; Jarpe, S.; Harben, P.

    2014-12-01

    There are many seismological aspects associated with monitoring of permanent storage of carbon dioxide (CO2) in geologic formations. Many of these include monitoring underground gas migration through detailed tomographic studies of rock properties, integrity of the cap rock and micro seismicity with time. These types of studies require expensive deployments of surface and borehole sensors in the vicinity of the CO2 injection wells. Another problem that may exist in CO2 sequestration fields is the potential for damaging induced seismicity associated with fluid injection into the geologic reservoir. Seismic hazard monitoring in CO2 sequestration fields requires a seismic network over a spatially larger region possibly having stations in remote settings. Expensive observatory-grade seismic systems are not necessary for seismic hazard deployments or small-scale tomographic studies. Hazard monitoring requires accurate location of induced seismicity to magnitude levels only slightly less than that which can be felt at the surface (e.g. magnitude 1), and the frequencies of interest for tomographic analysis are ~1 Hz and greater. We have developed a seismo/acoustic smart sensor system that can achieve the goals necessary for induced seismicity monitoring in CO2 sequestration fields. The unit is inexpensive, lightweight, easy to deploy, can operate remotely under harsh conditions and features 9 channels of recording (currently 3C 4.5 Hz geophone, MEMS accelerometer and microphone). An on-board processor allows for satellite transmission of parameter data to a processing center. Continuous or event-detected data is kept on two removable flash SD cards of up to 64+ Gbytes each. If available, data can be transmitted via cell phone modem or picked up via site visits. Low-power consumption allows for autonomous operation using only a 10 watt solar panel and a gel-cell battery. The system has been successfully tested for long-term (> 6 months) remote operations over a wide range

  14. Determination of the optimal positions for installing gamma ray detection systems at Tehran Research Reactor

    Science.gov (United States)

    Sayyah, A.; Rahmani, F.; Khalafi, H.

    2015-09-01

    Dosimetric instruments must constantly monitor radiation dose levels in different areas of nuclear reactor. Tehran Research Reactor (TRR) has seven beam tubes for different research purposes. All the beam tubes extend from the reactor core to Beam Port Floor (BPF) of the reactor facility. During the reactor operation, the gamma rays exiting from each beam tube outlet produce a specific gamma dose rate field in the space of the BPF. To effectively monitor the gamma dose rates on the BPF, gamma ray detection systems must be installed in optimal positions. The selection of optimal positions is a compromise between two requirements. First, the installation positions must possess largest gamma dose rates and second, gamma ray detectors must not be saturated in these positions. In this study, calculations and experimental measurements have been carried out to identify the optimal positions of the gamma ray detection systems. Eight three dimensional models of the reactor core and related facilities corresponding to eight scenarios have been simulated using MCNPX Monte Carlo code to calculate the gamma dose equivalent rate field in the space of the BPF. These facilities are beam tubes, thermal column, pool, BPF space filled with air, facilities such as neutron radiography facility, neutron powder diffraction facility embedded in the beam tubes as well as biological shields inserted into the unused beam tubes. According to the analysis results of the combined gamma dose rate field, three positions on the north side and two positions on the south side of the BPF have been recognized as optimal positions for installing the gamma ray detection systems. To ensure the consistency of the simulation data, experimental measurements were conducted using TLDs (600 and 700) pairs during the reactor operation at 4.5 MW.

  15. The Danish Marine Monitoring System

    DEFF Research Database (Denmark)

    Ærtebjerg, G.

    1997-01-01

    Indeholder abstracts fra Workshop on Marine Monitoring Systems and Technology, Risø, 17-18 April 1996.......Indeholder abstracts fra Workshop on Marine Monitoring Systems and Technology, Risø, 17-18 April 1996....

  16. System design package for a solar heating and cooling system installed at Akron, Ohio

    Science.gov (United States)

    1979-01-01

    Information used to evaluate the design of a solar heating, cooling, and domestic hot water system is given. A conventional heat pump provides summer cooling items as the design data brochure, system performance specification, system hazard analysis, spare parts list, and detailed design drawings. A solar system is installed in a single-family dwelling at Akron, Ohio, and at Duffield, Virginia.

  17. Installation package for a solar-heating system

    Science.gov (United States)

    1980-01-01

    Package consists of installation, operation and maintenance manuals for four commercial solar energy subsystems, including flat plate solar collector pebble bed thermal-storage. Manual gives design information, sizing data, specification drawings, and other material for subsystem.

  18. Design and installation of a low particulate, ultrahigh vacuum system for a high power free-electron laser

    CERN Document Server

    Dyll, Aa; Feldl, E; Parkinson, J; Preble, J; Siggins, T; Williams, S; Wisema, M

    1999-01-01

    A high-average power (kW) infrared (IR) free-electron laser (FEL) is currently being commissioned for the Jefferson Laboratory FEL User Facility. The IR FEL is driven by a unique superconducting rf linac which is recirculated to recover electron beam power that is not radiated in the FEL. The design and installation of the vacuum system for the FEL involved particular attention to minimizing particulate contamination which could cause problems with the superconducting acceleration cavities and the high power FEL optics. Particulate contamination levels of all vacuum components were monitored during the cleaning process using laser scattering. Cleaning, transport, and installation procedures were developed to minimize the contamination of the complete system. We will summarize a data base we compiled of particulate contamination levels of the various components installed in the FEL vacuum system.

  19. Design/installation and structural integrity assessment under the Federal Facility Agreement for Bethel Valley low-level waste collection and transfer system upgrade for Building 2026 (High Radiation Level Analytical Laboratory) and Building 2099 (Monitoring and Control Station) at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    This document presents a Design/Installation and Structural Integrity Assessment for a replacement tank system for portions of the Bethel Valley Low-Level Waste (LLW) System, located at the Oak Ridge Reservation, Oak Ridge, Tennessee. This issue of the assessment covers the design aspects of the replacement tank system, and certifies that the design has sufficient structural integrity and is acceptable for the storing or treating of hazardous and/or radioactive substances. This document will be reissued at a future date and will then include the assessment of the installation of the replacement tank system. The present issue identifies specific activities that must be completed during the fabrication, installation, and testing of the replacement tank system in order to provide assurance that the final installation complies with governing requirements.

  20. Integrated dynamic landscape analysis and modeling system (IDLAMS) : installation manual.

    Energy Technology Data Exchange (ETDEWEB)

    Li, Z.; Majerus, K. A.; Sundell, R. C.; Sydelko, P. J.; Vogt, M. C.

    1999-02-24

    The Integrated Dynamic Landscape Analysis and Modeling System (IDLAMS) is a prototype, integrated land management technology developed through a joint effort between Argonne National Laboratory (ANL) and the US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL). Dr. Ronald C. Sundell, Ms. Pamela J. Sydelko, and Ms. Kimberly A. Majerus were the principal investigators (PIs) for this project. Dr. Zhian Li was the primary software developer. Dr. Jeffrey M. Keisler, Mr. Christopher M. Klaus, and Mr. Michael C. Vogt developed the decision analysis component of this project. It was developed with funding support from the Strategic Environmental Research and Development Program (SERDP), a land/environmental stewardship research program with participation from the US Department of Defense (DoD), the US Department of Energy (DOE), and the US Environmental Protection Agency (EPA). IDLAMS predicts land conditions (e.g., vegetation, wildlife habitats, and erosion status) by simulating changes in military land ecosystems for given training intensities and land management practices. It can be used by military land managers to help predict the future ecological condition for a given land use based on land management scenarios of various levels of training intensity. It also can be used as a tool to help land managers compare different land management practices and further determine a set of land management activities and prescriptions that best suit the needs of a specific military installation.

  1. Integrated monitoring and surveillance system demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Aumeier, S.E.; Walters, G. [Argonne National Lab., Idaho Falls, ID (United States); Kotter, D.; Walrath, W.M.; Zamecnik, R.J. [Lockheed-Martin Idaho Technologies Company, Idaho Falls, ID (United States)

    1997-07-01

    We present a summary of efforts associated with the installation of an integrated system for the surveillance and monitoring of stabilized plutonium metals and oxides in long-term storage. The product of this effort will include a Pu storage requirements document, baseline integrated monitoring and surveillance system (IMSS) prototype and test bed that will be installed in the Fuel Manufacturing Facility (FMF) nuclear material vault at Argonne National Laboratory - West (ANL-W), and a Pu tracking database including data analysis capabilities. The prototype will be based on a minimal set of vault and package monitoring requirements as derived from applicable DOE documentation and guidelines, detailed in the requirements document, including DOE-STD-3013-96. The use of standardized requirements will aid individual sites in the selection of sensors that best suit their needs while the prototype IMSS, located at ANL-W, will be used as a test bed to compare and contrast sensor performance against a baseline integrated system (the IMSS), demonstrate system capabilities, evaluate potential technology gaps, and test new hardware and software designs using various storage configurations. With efforts currently underway to repackage and store a substantial quantity of plutonium and plutonium-bearing material within the DOE complex, this is an opportune time to undertake such a project. 4 refs.

  2. Physical installation of Pelletron and electron cooling system

    Energy Technology Data Exchange (ETDEWEB)

    Hurh, P.

    1997-09-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here.

  3. ADVANCES IN CLOG STATE MONITORING FOR USE IN AUTOMATED REED BED INSTALLATIONS

    Directory of Open Access Journals (Sweden)

    Theodore HUGHES-RILEY

    2014-06-01

    Full Text Available Constructed wetlands are a popular form of waste-water treatment that have proliferated across Europe and the rest of the world in recent years as an environmentally conscious form of waste water treatment. The ability to monitor the conditions in the bed and control input factors such as heating and aeration may extend the lifetime of the reed bed substantially beyond the ten year lifetime normally reached. The Autonomous Reed Bed Installation (ARBI project is an EU FP7 initiative to develop a reed bed with automated control over input parameters based on readings taken from embedded sensors. Automated remedial action may improve bed treatment efficiency, and prolong the life of the bed and avoiding the need to refurbish the bed, which is both time consuming and costly. One critical parameter to observe is the clog state of the reed bed, as this can severely impact on the efficiency of water treatment to the point of the bed becoming non-operable. Magnetic resonance (MR sensors can be a powerful tool in determining clogging levels, and has previously been explored in the literature. This work is based on a conference paper (2nd International Conference "Water resources and wetlands", 2014 and details magnetic sensors suitable for long-term embedding into a constructed wetland. Unlike previous studies this work examines a probe embedded into a wetland.

  4. An Electrical Energy Consumption Monitoring and Forecasting System

    Directory of Open Access Journals (Sweden)

    J. L. Rojas-Renteria

    2016-10-01

    Full Text Available Electricity consumption is currently an issue of great interest for power companies that need an as much as accurate profile for controlling the installed systems but also for designing future expansions and alterations. Detailed monitoring has proved to be valuable for both power companies and consumers. Further, as smart grid technology is bound to result to increasingly flexible rates, an accurate forecast is bound to prove valuable in the future. In this paper, a monitoring and forecasting system is investigated. The monitoring system was installed in an actual building and the recordings were used to design and evaluate the forecasting system, based on an artificial neural network. Results show that the system can provide detailed monitoring and also an accurate forecast for a building’s consumption.

  5. Systems study of drilling for installation of geothermal heat pumps

    Energy Technology Data Exchange (ETDEWEB)

    Finger, J.T.; Sullivan, W.N.; Jacobson, R.D.; Pierce, K.G.

    1997-09-01

    Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the spread-sheet.

  6. Solar heating and hot water system installed at Charlotte Memorial Hospital, Charlotte, North Carolina

    Science.gov (United States)

    1981-01-01

    Detailed information regarding the design and installation of a heating and hot water system in a commercial application is given. This information includes descriptions of system and building, design philosophy, control logic operation modes, design and installation drawing and a brief description of problems encountered and their solutions.

  7. 30 CFR 75.1101-5 - Installation of foam generator systems.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of foam generator systems. 75.1101-5 Section 75.1101-5 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-5 Installation of foam generator systems....

  8. Tools for Distributed Systems Monitoring

    Directory of Open Access Journals (Sweden)

    Kufel Łukasz

    2016-11-01

    Full Text Available The management of distributed systems infrastructure requires dedicated set of tools. The one tool that helps visualize current operational state of all systems and notify when failure occurs is available within monitoring solution. This paper provides an overview of monitoring approaches for gathering data from distributed systems and what are the major factors to consider when choosing a monitoring solution. Finally we discuss the tools currently available on the market.

  9. Challenges of an Industrialized Acousto-Ultrasonic Sensor System Installation on Primary Aircraft Structure

    OpenAIRE

    Dobmann, Nicolas; Bach, Martin; Eckstein, Benjamin

    2014-01-01

    International audience; At laboratory level, secondary bonding of Acousto-Ultrasonic sensor systems is well established and has proven its reliability in applications from coupon level up to flight test installations. However, the applied sensor secondary bonding is a manual process with high amount of required auxiliaries and tools and is hence associated with high costs. In transition from sensor installation under laboratory conditions to the installation of large-scale sensor networks wit...

  10. The unrest of S. Miguel volcano (El Salvador, CA): installation of the monitoring network and observed volcano-tectonic ground deformation

    Science.gov (United States)

    Bonforte, A.; Hernandez, D.; Gutiérrez, E.; Handal, L.; Polío, C.; Rapisarda, S.; Scarlato, P.

    2015-10-01

    On 29 December 2013, the Chaparrastique volcano in El Salvador, close to the town of S. Miguel, erupted suddenly with explosive force, forming a more than 9 km high column and projecting ballistic projectiles as far as 3 km away. Pyroclastic Density Currents flowed to the north-northwest side of the volcano, while tephras were dispersed northwest and north-northeast. This sudden eruption prompted the local Ministry of Environment to request cooperation with Italian scientists in order to improve the monitoring of the volcano during this unrest. A joint force made up of an Italian team from the Istituto Nazionale di Geofisica e Vulcanologia and a local team from the Ministerio de Medio Ambiente y Recursos Naturales was organized to enhance the volcanological, geophysical and geochemical monitoring system to study the evolution of the phenomenon during the crisis. The joint team quickly installed a multi-parametric mobile network comprising seismic, geodetic and geochemical sensors, designed to cover all the volcano flanks from the lowest to the highest possible altitudes, and a thermal camera. To simplify the logistics for a rapid installation and for security reasons, some sensors were co-located into multi-parametric stations. Here, we describe the prompt design and installation of the geodetic monitoring network, the processing and results. The installation of a new ground deformation network can be considered an important result by itself, while the detection of some crucial deforming areas is very significant information, useful for dealing with future threats and for further studies on this poorly monitored volcano.

  11. CERN Safety System Monitoring - SSM

    CERN Document Server

    Hakulinen, T; Valentini, F; Gonzalez, J; Salatko-Petryszcze, C

    2011-01-01

    CERN SSM (Safety System Monitoring) [1] is a system for monitoring state-of-health of the various access and safety systems of the CERN site and accelerator infrastructure. The emphasis of SSM is on the needs of maintenance and system operation with the aim of providing an independent and reliable verification path of the basic operational parameters of each system. Included are all network-connected devices, such as PLCs, servers, panel displays, operator posts, etc. The basic monitoring engine of SSM is a freely available system-monitoring framework Zabbix [2], on top of which a simplified traffic-light-type web-interface has been built. The web-interface of SSM is designed to be ultra-light to facilitate access from handheld devices over slow connections. The underlying Zabbix system offers history and notification mechanisms typical of advanced monitoring systems.

  12. 40 CFR 63.7831 - What are the installation, operation, and maintenance requirements for my monitors?

    Science.gov (United States)

    2010-07-01

    ... operating limits in § 63.7790(b)(2) for pressure drop and scrubber water flow rate, you must install... a manner consistent with the guidance document, “Fabric Filter Bag Leak Detection Guidance,”...

  13. 40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ..., the pollutant concentration or parametric signal analyzer, and the data collection and reduction... must install, calibrate, and operate a flow indicator at the inlet or outlet of the control device to...

  14. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    Science.gov (United States)

    De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.

    2015-12-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.

  15. 30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of water sprinkler systems; requirements. 75.1101-7 Section 75.1101-7 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-7 Installation of water...

  16. 30 CFR 75.1101-14 - Installation of dry powder chemical systems.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of dry powder chemical systems. 75.1101-14 Section 75.1101-14 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-14 Installation of dry powder...

  17. OpenSM Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    2015-04-17

    The OpenSM Monitoring System includes a collection of diagnostic and monitoring tools for use on Infiniband networks. The information this system gathers is obtained from a service, which in turn is obtained directly from the OpenSM subnet manager.

  18. Ecological Monitoring Information System (EMIS).

    Science.gov (United States)

    Fiene, Richard John; And Others

    A system for evaluating and monitoring child development projects, with possible computerization capabilities, was developed for the State of Pennsylvania in connection with 26 child development projects funded by the Appalachian Regional Commission. The Ecological Monitoring Information System (EMIS), provides a series of ecological measurement…

  19. GuMNet - Guadarrama Monitoring Network. Installation and set up of a high altitude monitoring network, north of Madrid. Spain

    Science.gov (United States)

    Santolaria-Canales, Edmundo

    2015-04-01

    An observational monitoring network in the Guadarrama Mountains is due to be operational at the end of 2015. This network integrates atmospheric measurements as well as subsurface observations in a high mountain climate, located up to 2.400 m.a.s.l. The data provided by GuMNet will help to improve the characterization of microclimate in high mountain areas, as well as land-atmosphere interations. The network information aims at meeting the needs of accuracy to be used for biological, agricultural, hydrological, meteorological and climatic investigations in this area. This initiative is supported and developed by research groups integrating the GuMNet Consortiuma from the Complutense and Polytechnical Universities of Madrid (UCM and UPM), the Energetic Environmental and Technological Research Centre (CIEMAT), the Spanish National Meteorological Agency (AEMET), and the National Park Sierra de Guadarrama (PNSG). The starting setup includes seven meteorological stations compatible with WMO standards, to be installed in the central area of the massif. Including a four-component net radiation sensor, an ultrasonic snow height, a pluviometer specialized for snow capture, air temperature and humidity devices and wind speed/direction sensor. Along with these atmospheric measurements, each station will include a set of subsurface measurements of temperature in shallow boreholes ( 20 m depth ) and temperature and humidity in trenches up to 1 m depth. These compatible WMO stations will be complemented by a station specialized in eddy covariance measuremets with CO2 fluxes at low altitude pastureland near Madrid. Another portable station is available to develop ad hoc comparison studies. This setup is embedded in a broader network of meteorological stations run partly by AEMET and partly by the PNSG. Most of the AEMET stations are distributed over lower altitudes, and will provide a very reliable boundary information for the atmosphere state around the Sierra. In the same way

  20. Arduino Based Infant Monitoring System

    Science.gov (United States)

    Farhanah Mohamad Ishak, Daing Noor; Jamil, Muhammad Mahadi Abdul; Ambar, Radzi

    2017-08-01

    This paper proposes a system for monitoring infant in an incubator and records the relevant data into a computer. The data recorded by the system can be further referred by the neonatal intensive care unit (NICU) personnel for diagnostic or research purposes. The study focuses on designing the monitoring system that consists of an incubator equipped with humidity sensor to measure the humidity level, and a pulse sensor that can be attached on an infant placed inside the incubator to monitor infant’s heart pulse. The measurement results which are the pulse rate and humidity level are sent to the PC via Arduino microcontroller. The advantage of this system will be that in the future, it may also enable doctors to closely monitor the infant condition through local area network and internet. This work is aimed as an example of an application that contributes towards remote tele-health monitoring system.

  1. DEMONSTRATiON OF A SUBSURFACE CONTAINMENT SYSTEM FOR INSTALLATION AT DOE WASTE SITES

    Energy Technology Data Exchange (ETDEWEB)

    Thomas J. Crocker; Verna M. Carpenter

    2003-05-21

    Between 1952 and 1970, DOE buried mixed waste in pits and trenches that now have special cleanup needs. The disposal practices used decades ago left these landfills and other trenches, pits, and disposal sites filled with three million cubic meters of buried waste. This waste is becoming harmful to human safety and health. Today's cleanup and waste removal is time-consuming and expensive with some sites scheduled to complete cleanup by 2006 or later. An interim solution to the DOE buried waste problem is to encapsulate and hydraulically isolate the waste with a geomembrane barrier and monitor the performance of the barrier over its 50-yr lifetime. The installed containment barriers would isolate the buried waste and protect groundwater from pollutants until final remediations are completed. The DOE has awarded a contract to RAHCO International, Inc.; of Spokane, Washington; to design, develop, and test a novel subsurface barrier installation system, referred to as a Subsurface Containment System (SCS). The installed containment barrier consists of commercially available geomembrane materials that isolates the underground waste, similar to the way a swimming pools hold water, without disrupting hazardous material that was buried decades ago. The barrier protects soil and groundwater from contamination and effectively meets environmental cleanup standards while reducing risks, schedules, and costs. Constructing the subsurface containment barrier uses a combination of conventional and specialized equipment and a unique continuous construction process. This innovative equipment and construction method can construct a 1000-ft-long X 34-ft-wide X 30-ft-deep barrier at construction rates to 12 Wday (8 hr/day operation). Life cycle costs including RCRA cover and long-term monitoring range from approximately $380 to $590/cu yd of waste contained or $100 to $160/sq ft of placed barrier based upon the subsurface geology surrounding the waste. Project objectives for Phase

  2. Geological hazard monitoring system in Georgia

    Science.gov (United States)

    Gaprindashvili, George

    2017-04-01

    Georgia belongs to one of world's most complex mountainous regions according to the scale and frequency of Geological processes and damage caused to population, farmlands, and Infrastructure facilities. Geological hazards (landslide, debrisflow/mudflow, rockfall, erosion and etc.) are affecting many populated areas, agricultural fields, roads, oil and gas pipes, high-voltage electric power transmission towers, hydraulic structures, and tourist complexes. Landslides occur almost in all geomorphological zones, resulting in wide differentiation in the failure types and mechanisms and in the size-frequency distribution. In Georgia, geological hazards triggered by: 1. Activation of highly intense earthquakes; 2. Meteorological events provoking the disaster processes on the background of global climatic change; 3. Large-scale Human impact on the environment. The prediction and monitoring of Geological Hazards is a very wide theme, which involves different researchers from different spheres. Geological hazard monitoring is essential to prevent and mitigate these hazards. In past years in Georgia several monitoring system, such as Ground-based geodetic techniques, Debrisflow Early Warning System (EWS) were installed on high sensitive landslide and debrisflow areas. This work presents description of Geological hazard monitoring system in Georgia.

  3. Installation and operation of a large scale RAPS system in Peru

    Science.gov (United States)

    Cole, J. F.

    In 1997, International Lead Zinc Research Organization Inc. (ILZRO), Solar Energy Industries Association (SEIA), and the Ministry of Energy and Mines (MEM) of Peru signed a Memorandum of Understanding to facilitate the installation of hybrid remote area power supply (RAPS) systems in the Amazon region of Peru. Many remote villages in this vast region have either no or limited electricity supplied by diesel generators running a few hours per day. Subsequently, ILZRO sponsored the engineering design of the hybrid RAPS system and SEIA supported a socio-economic study to determine the sustainability of such systems and the locations for pilot installations. In mid-1998, the Peruvian government approved the design of the system. ILZRO then began efforts to obtain governmental and inter-governmental funding to supplement its own funds to underwrite the cost of manufacture and installation of the systems in two villages in the Amazon region. Additional major funding has been received from the Global Environmental Facility (GEF) administered by the United Nations Development Program (UNDP) and from the Common Fund for Commodities (CFC). Funds have also been received from the US Department of Energy, the International Greenhouse Partnership (Australia) and the Peruvian government. The RAPS system consists of modules designed to provide 150 kW h per day of utility grade ac electricity over a 24 h period. Each module contains a diesel generator, battery bank using heavy-duty 2 V VRLA GEL batteries, a battery charger, a photovoltaic array and an ac/dc inverter. The batteries and electrical components are housed in modified shipping containers. The modules can be installed with a new generator or retrofitted to an existing generator. The charging and discharging regime of the batteries has been recommended by a study carried out by CSIRO, which has simulated the RAPS operation. The system will employ a partial-state-of-charge (PSOC) regime in order to optimize the life of the

  4. Easy installation method of piezoceramic (PZT) transducers for health monitoring of structures using electro-mechanical impedance technique

    Science.gov (United States)

    Annamdas, Venu Gopal Madhav; Radhika, Madhav Annamdas; Yang, Yaowen

    2009-03-01

    Impedance-based structural health monitoring (SHM) technique has been developed using piezo-ceramic (PZT) transducers either by surface bonding or embedding inside the structure to detect damage at the earliest possible stage using signatures. However, this technique requires PZT to be permanently attached to the structures. Furthermore permanent attachment will influence the appearance of the host structure and during replacement of faulty transducer, the use of de bonding tools may spoils the surface and beneath. Hence the present study is aimed to fabricate a portable structure, where PZTs are bonded on it and later the portable structure is attached to the host structure. This portable structure is easy to install during monitoring period and uninstall after recording the monitoring signatures of the host structure. This method protects the surface of the host structure to be monitored and will have same efficiency as that of permanently attached PZTs.

  5. Gas House Autonomous System Monitoring

    Science.gov (United States)

    Miller, Luke; Edsall, Ashley

    2015-01-01

    Gas House Autonomous System Monitoring (GHASM) will employ Integrated System Health Monitoring (ISHM) of cryogenic fluids in the High Pressure Gas Facility at Stennis Space Center. The preliminary focus of development incorporates the passive monitoring and eventual commanding of the Nitrogen System. ISHM offers generic system awareness, adept at using concepts rather than specific error cases. As an enabler for autonomy, ISHM provides capabilities inclusive of anomaly detection, diagnosis, and abnormality prediction. Advancing ISHM and Autonomous Operation functional capabilities enhances quality of data, optimizes safety, improves cost effectiveness, and has direct benefits to a wide spectrum of aerospace applications.

  6. A new fire alarm system for electrical installations

    CERN Document Server

    Pietersen, A H

    1978-01-01

    Fires in electrical installations are considered to develop in four phases - initiation, smouldering, flame formation and heat development. Cables are among the more sensitive components, with working temperatures around 50 degrees C and fire detection at 70 degrees C. Conventional alarms include smoke detectors. The new technique described uses microcapsules containing powder forming a gas of the Freon type after diffusion. A typical microcapsule loses 4% per year and has a natural life of 10 years. Fabrication methods are described. Detection is by gas concentration, with a sensitivity of 1 to 10 ppm, or by acoustic methods with microphones to pick up the sound of fractures. Pressure/temperature characteristics of various types of Freon mixtures commercially available are given in graphical form.

  7. Technical Analysis of Installed Micro-Combined Heat and Power Fuel-Cell System

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, Kriston P.; Makhmalbaf, Atefe

    2014-10-31

    Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and hot water with greater efficiency and lower emissions than alternative sources. These systems can be used either as baseload, grid-connected, or as off-the-grid power sources. This report presents a technical analysis of 5 kWe CHP-FCSs installed in different locations in the U.S. At some sites as many as five 5 kWe system is used to provide up to 25kWe of power. Systems in this power range are considered “micro”-CHP-FCS. To better assess performance of micro-CHP-FCS and understand their benefits, the U.S. Department of Energy worked with ClearEdge Power to install fifteen 5-kWe PBI high temperature PEM fuel cells (CE5 models) in the commercial markets of California and Oregon. Pacific Northwest National Laboratory evaluated these systems in terms of their economics, operations, and technical performance. These units were monitored from September 2011 until June 2013. During this time, about 190,000 hours of data were collected and more than 17 billion data points were analyzed. Beginning in July 2013, ten of these systems were gradually replaced with ungraded systems (M5 models) containing phosphoric acid fuel cell technology. The new units were monitored until June 2014 until they went offline because ClearEdge was bought by Doosan at the time and the new manufacturer did not continue to support data collection and maintenance of these units. During these two phases, data was collected at once per second and data analysis techniques were applied to understand behavior of these systems. The results of this analysis indicate that systems installed in the second phase of this demonstration performed much better in terms of availability, consistency in generation, and reliability. The average net electrical power output increased from 4.1 to 4.9 kWe, net heat recovery from 4.7 to 5.4 kWth, and system availability improved from 94% to 95%. The average net system electric

  8. An Electrical Energy Consumption Monitoring and Forecasting System

    OpenAIRE

    Rojas-Renteria, J. L.; T. D. Espinoza-Huerta; F. S. Tovar-Pacheco; Gonzalez-Perez, J. L.; Lozano-Dorantes, R.

    2016-01-01

    Electricity consumption is currently an issue of great interest for power companies that need an as much as accurate profile for controlling the installed systems but also for designing future expansions and alterations. Detailed monitoring has proved to be valuable for both power companies and consumers. Further, as smart grid technology is bound to result to increasingly flexible rates, an accurate forecast is bound to prove valuable in the future. In this paper, a monitoring and forecastin...

  9. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    CERN Document Server

    De Salvo, Alessandro; The ATLAS collaboration; Smirnov, Yuri; Sanchez, Arturo

    2015-01-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  10. Unattended Monitoring System Design Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Drayer, D.D.; DeLand, S.M.; Harmon, C.D.; Matter, J.C.; Martinez, R.L.; Smith, J.D.

    1999-07-08

    A methodology for designing Unattended Monitoring Systems starting at a systems level has been developed at Sandia National Laboratories. This proven methodology provides a template that describes the process for selecting and applying appropriate technologies to meet unattended system requirements, as well as providing a framework for development of both training courses and workshops associated with unattended monitoring. The design and implementation of unattended monitoring systems is generally intended to respond to some form of policy based requirements resulting from international agreements or domestic regulations. Once the monitoring requirements are established, a review of the associated process and its related facilities enables identification of strategic monitoring locations and development of a conceptual system design. The detailed design effort results in the definition of detection components as well as the supporting communications network and data management scheme. The data analyses then enables a coherent display of the knowledge generated during the monitoring effort. The resultant knowledge is then compared to the original system objectives to ensure that the design adequately addresses the fundamental principles stated in the policy agreements. Implementation of this design methodology will ensure that comprehensive unattended monitoring system designs provide appropriate answers to those critical questions imposed by specific agreements or regulations. This paper describes the main features of the methodology and discusses how it can be applied in real world situations.

  11. Engineering monitoring expert system's developer

    Science.gov (United States)

    Lo, Ching F.

    1991-01-01

    This research project is designed to apply artificial intelligence technology including expert systems, dynamic interface of neural networks, and hypertext to construct an expert system developer. The developer environment is specifically suited to building expert systems which monitor the performance of ground support equipment for propulsion systems and testing facilities. The expert system developer, through the use of a graphics interface and a rule network, will be transparent to the user during rule constructing and data scanning of the knowledge base. The project will result in a software system that allows its user to build specific monitoring type expert systems which monitor various equipments used for propulsion systems or ground testing facilities and accrues system performance information in a dynamic knowledge base.

  12. Radiation monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Aghina, Mauricio A.C.; Farias, Marcos S. de; Lacerda, Fabio de; Heimlich, Adino [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    Design of a portable low-power multichannel analyzer with wireless connectivity for remote radiation monitoring, powered from a solar panel with a internal battery to be operated in field. The multichannel analyzer is based on a single microcontroller which performs the digital functions and an analog signal processing board for implementing a Gaussian shaper preamplifier, a Gaussian stretcher, sample and hold, pile-up rejector and a 10 bit ADC. Now this design is to be used with a NaI(Ti) scintillator detector. This multichannel analyzer is designed to be a part of radiation monitoring network. All of them are connected, by radio in a radius of 10 kilometers, to a supervisor computer that collects data from the network of multichannel analyzers and numerically display the latest radiation measurements or graphically display measurements over time for all multichannel analyzers. Like: dose rate, spectra and operational status. Software also supports remotely configuring operating parameters (such as radiation alarm level) for each monitor independently. (author)

  13. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Science.gov (United States)

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... operating limits in § 63.9890(b) for pressure drop and scrubber water flow rate, you must install, operate...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position...

  14. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Science.gov (United States)

    2010-07-01

    ... pushing emissions, you must install, operate, and maintain CPMS to measure and record the pressure drop... the pressure drop across each multicyclone during each push according to the requirements in... a manner consistent with the guidance document, “Fabric Filter Bag Leak Detection Guidance”...

  15. Automatic Functional Step-up System in High-Voltage Installation

    Institute of Scientific and Technical Information of China (English)

    陈方泉; 严一白; 宋进; 林财兴

    2004-01-01

    This article describes automatic functional step-up systems in high-voltage installation, with emphases on functional process of step-up and step-down, two-circuit control and elimination of tip burr voltage.

  16. Installation and Commissioning of the Main Magnet Elevating System for CYCIAE-100

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    The main magnet elevating system is a key part for CYCIAE-100. The raising device will play an important role throughout the process of installation, magnetic mapping, vacuum leak detection, beam commissioning, and maintenance.

  17. Automated wind-icing monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Horokhov, Y.; Nekrasov, Y.; Turbin, S. [Donbas National Academy of Civil Engineering and Architecture, Makeyevka, Donetsk (Ukraine); Grimud, G. [NEC Ukrenergo, Kiev (Ukraine)

    2005-07-01

    The development of automated wind-icing monitoring systems (AWIMS) has increased the operational reliability of existing overhead lines through a more accurate prediction of icing events in the Ukraine. The systems are capable of operating without the presence of personnel, and allow operators to immediately obtain information about icing processes. The systems provide statistically significant sets of data for determining and predicting loading conditions, as well as combining measurements of icing mass, wind speed and direction, temperature and humidity. An outline of the principles of AWIMS was presented in paper, as well as a description of the system's architecture and operating principles. The monitoring system consists of an ice mass measuring device; a strain gauge sensor; a photoelectric pickup to determine perpendicular mean wind direction; and a wire simulator. The measuring devices are installed 10 meters above ground. Data is transmitted every 30 minutes to a central information office, where information is processed and stored. Details of the ultrasonic anemometer for wind measurements as well as the devices used for humidity and temperature measurement were presented. The AWIMS computer software measures 6 climatic parameters: wind speed; wind direction; air temperature; humidity; icing mass; and wind pressure on ice-covered wires. Results of a series of tests were presented which included a weather station data analysis and a comparison of the AWIMS with standard climatic loads. An analysis of overhead line failure statistical data was also conducted. Spatial icing distributions were used to calculate the threshold sensitivity for the AWIMS. As estimation of overhead lines density per square kilometer showed was made to determine placement of the systems. It was concluded that 8 more AWIMS will be installed in the following year. 3 refs., 10 figs.

  18. Sprites and lightning observation system installed at ESRANGE, Kiruna

    Science.gov (United States)

    Takahashi, Y.; Sato, M.; Ohkubo, A.; Fukunishi, H.; Nozawa, S.; Fujii, R.

    2003-12-01

    Activities of sprites and elves were first recorded in the west coast of Japan when a cold front passed over Japan by Tohoku University group in 1998. This fact strongly predicts occurrence of sprites and elves in other areas in wintertime, such as Northern Scandinavia where large positive CGs are occurring in wintertime. Once sprites and/or elves in the polar region are detected, it would be expected that many important phenomena are occurring: the interaction between the lightning-induced phenomena and the polar ionosphere/magnetosphere by electron density enhancement and by field-aligned current connection, high energy particle supply to the magnetosphere and so on. In order to conduct the sprites/elves imaging in the polar region, we improved an image-intensified CCD camera at ESRANGE, Kiruna, Sweden in August 2003, and also installed VLF receiver there. Further, we set up 2-components ELF receivers as the third station of the ELF world network of Tohoku University. All equipments are remotely controlled from Japan using network. A careful examination of Scandinavian lightning data provided by SINTEF and ELF recordings by Tohoku University shows there exist some strong cloud-ground discharges with a sufficient charge moment to produce sprites in January and February in the polar region.

  19. The Design Fabrication Installation & Evaluation of the Balance Probe Monitor for Large Centrifuges at a National Laboratory Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, Jonathan Michael [Univ. of Texas, Austin, TX (United States)

    2016-11-01

    Balance Probe Monitors were designed, fabricated, installed, and evaluated at Sandia National Laboratories (SNL) for the 22,600 g kg (50,000 g lb) direct drive electromotor driven large centrifuges. These centrifuges provide a high onset/decay rate g environment. The Balance Probe Monitor is physically located near a centrifuge’s Capacitance Probe, a crucial sensor for the centrifuge’s sustainability. The Balance Probe Monitor will validate operability of the centrifuge. Most importantly, it is used for triggering a kill switch under the condition that the centrifuge displacement value exceeds allowed tolerances. During operational conditions, the Capacitance Probe continuously detects the structural displacement of the centrifuge and an adjoining AccuMeasure 9000 translates this displacement into an output voltage.

  20. Wearable Health Monitoring Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this proposal is to demonstrate the feasibility of producing a wearable health monitoring system for the human body that is functional, comfortable,...

  1. Wearable Health Monitoring Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this proposal is to demonstrate the feasibility of producing a wearable health monitoring system for the human body that is functional, comfortable,...

  2. Research of PD on-line Monitoring System for DC Cable

    Directory of Open Access Journals (Sweden)

    Duan Da-Peng

    2014-01-01

    Full Text Available In order to monitor the insulation of XLPE cable of rail system, an On-line Partial Discharge (PD Monitoring System applied for 1500V DC cables of Shanghai Traction Substation is described, including its hardware and software structure. After installed, this system successfully detected one PD signal. The results demonstrated that this system worked stably and reliably.

  3. Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC

    CERN Document Server

    Weisz, S; Foraz, K; Rodríguez-Mateos, F

    2006-01-01

    The running of individual system tests has to fit within tight constraints of the LHC installation planning and of CERN's accelerator activity in general. For instance, the short circuit tests of the power converters that are performed in-situ restrict the possibility to work in neighbouring areas; much in the same way, the cold tests of the cryogenic distribution line involve safety access restrictions that are not compatible with the transport and installation of cryo-magnets or interconnect activities in the sector considered. Still, these individual system tests correspond to milestones that are required to insure that we can continue with the installation of machine elements. This paper reviews the conditions required to perform the individual system tests and describe how the general LHC installation planning is organised to allocate periods for these tests.

  4. Succeeding in the grafting of a cogeneration system to an old space heating installation; Reussir la greffe d'une cogeneration sur une installation ancienne

    Energy Technology Data Exchange (ETDEWEB)

    Desjardins, C.

    2003-05-01

    Substantial energy savings can be made in the tertiary sector thanks to the implementation of cogeneration systems. The 'grafting' of a cogeneration system to an existing space heating installation requires to take some precautions which are explained in this technical article using a real example. In particular, it shows why, despite some visible improvements, some installations can suffer from a lack of performance. (J.S.)

  5. Installation of seafloor cabled seismic and tsunami observation system developed by using ICT

    Science.gov (United States)

    Shinohara, Masanao; Yamada, Tomoaki; Sakai, Shin'ichi; Shiobara, Hajime; Kanazawa, Toshihiko

    2017-04-01

    A seafloor cabled system is useful for study of earth science and disaster mitigation, because real-time and long-term observation can be performed. Therefore seafloor cabled systems with seismometers and tsunami-meters have been used over the past 25 years around Japan. Because increase of a number of sensors is needed, a new system with low costs for production, deployment and operation is expected. In addition, the new system should have sufficient for flexibility of measurements after installation. To achieve these demands, we started development of a new system using Information and Communication Technologies (ICT) for data transmission and system control. The new system can be made compact since software processes various measurements. Reliability of the system is kept by using redundant system which is easily constructed using the ICT. The first system based on this concept was developed as Ocean Bottom Cabled Seismometer (OBCS) system and deployed in Japan Sea. Development of the second system started from 2012. The Ocean Bottom Cabled Seismometer and Tsunami-meter (OBCST) system has both seismometers and tsunami-meters. Each observation node has a CPU and FPGAs. The OBCST system uses standard TCP/IP protocol with a speed of 1 Gbps for data transmission, system control and monitoring. IEEE-1588 (PTP) is implemented to synchronize a real-time clock, and accuracy is less than 300 ns. We developed two types of observation node. One equips a pressure gauge as tsunami sensor, and another has an external port for additional observation sensor using PoE. Deployment of the OBCST system was carried out in September 2015 by using a commercial telecommunication cable ship. The noise levels at the OBCST system are comparable to those at the existing cabled system off Sanriku. It is found that the noise levels at the OBCST system are low at frequencies greater than 2 Hz and smaller than 0.1 Hz. This level of ambient seismic noise is close to a typical system noise. From

  6. Completed installations and the individual commissioning of the KSTAR MG system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang-Hwan, E-mail: kch2004@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Eom, Dae-young; Lee, Woo-Jin; Kong, Jong-Dea; Joung, Nam-Young; Kim, Yang-Soo; Kwon, Myeun [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Jang, Eun; Han, Chul-Woo; Lee, Sel-Ki; Kim, Gwang-Seon; Maeng, Jae-Hoon [Vitzrotech Co., Ltd, 605-2 Seonggok-dong, Danwon-gu, Ansan, Gyeonggi-do 425-833 (Korea, Republic of)

    2014-04-15

    Highlights: • All components of the MG system were made from each professional supplier and installed completely in the NFRI site. • The building and the overhead crane which need to install the MG system, were built in two sections. One is for the bearing, rotor and stator and the other section is for the VVVF and excitation system. • The dummy coil testing will commence in July 2013 and the comprehensive performance test of MG will be tested from August when the MPS commissioning is processing with superconducting coil. - Abstract: Peak power of 200 MVA is required in order to achieve the goal within a long pulse scenario for the final operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The available grid power is only 100 MVA at the National Fusion Research Institute (NFRI) site. Motor generator (MG) was considered as a method of resolving such problems. The design of the KSTAR MG system was completed in July 2010 and individual devices were produced by relevant manufacturers. The installation of individual devices was completed in December 2012. Specifically, the stator and rotor were assembled at the site due to their large size and weight. The bearings, variable voltage variable frequency (VVVF) and excitation systems were transported and installed on site after being manufactured externally. The building used for MG installation was built in 2011. With the building designed for ease of installation, an overhead crane was designed to allow access to the loading bay. In this paper, we discuss the installation of the MG system and the construction of the building suitable for installation of individual devices. In addition, performance on the test results of individual devices is also discussed.

  7. Bewegingsvolgsysteem = Monitor tracking system

    NARCIS (Netherlands)

    Slycke, Per Johan; Veltink, Petrus Hermanus; Roetenberg, Daniel

    2006-01-01

    A motion tracking system for tracking an object composed of object parts in a three-dimensional space. The system comprises a number of magnetic field transmitters; a number of field receivers for receiving the magnetic fields of the field transmitters; a number of inertial measurement units for rec

  8. Bewegingsvolgsysteem = Monitor tracking system

    NARCIS (Netherlands)

    Slycke, Per Johan; Veltink, Petrus Hermanus; Roetenberg, Daniel

    2007-01-01

    A motion tracking system for tracking an object composed of object parts in a three-dimensional space. The system comprises a number of magnetic field transmitters; a number of field receivers for receiving the magnetic fields of the field transmitters; a number of inertial measurement units for rec

  9. Solar heating system installed at Blakedale Professional Center, Greenwood, South Carolina

    Science.gov (United States)

    1980-01-01

    Information on the solar heating system installed at the Blakedale Professional Center, in Greenwood, South Carolina is presented. The information consists of site and building description, solar system description, performance evaluation, system problems and installation drawings. The solar system was designed to provide approximately 85 percent of the building's heating requirements. The system was installed concurrently with building construction and heats 4,440 square feet of the building. There are 954 square feet of liquid flat plate collectors that are proof-mounted and have a drain-down system to protect the collectors from freezing. A 5,000 gallon steel, polyurethane insulated tank buried underground provides storage. The system was fully instrumented for performance evaluation and integrated into the National Solar Data Network.

  10. Integration of multiplexing with controls simplifies installation of air quality control systems

    Energy Technology Data Exchange (ETDEWEB)

    Schuss, J.A.; Makuch, J.A.

    1978-01-01

    The design and operation of the 4-module spray tower scrubber system for the 1100-MW Coal Creek Station in North Dakota are described and the requirements for and selection of a control system for the scrubber system are discussed. A multiprocessor distributed network digital control system was selected as most advantageous, flexible, and reliable, and is being installed. (LCL)

  11. Parameter Designing for Heave Compensation Hydraulic System Installed in Deepwater

    Directory of Open Access Journals (Sweden)

    Zhao Teng

    2013-01-01

    Full Text Available The function diagram of active heave compensation hydraulic system has been given, besides, the mathematics model for the principal hydraulic components of the compensation system has been built, and the input-output relation between components has been made clear. Aimed at compensating work capacity for the system, design and research on parameters as the bearing pressure, the initial state and the maximum flow of hydraulic cylinder, accumulator and other principal components have been made separately, and standardized design has been accomplished in accordance with relevant standards. Furthermore, calculus and verification for the capacity of the hydraulic system in different working stages have been made in order to calculate the pressure lose of the system and provide objective data for the hardware system design of the hydraulic components of the heave compensation system.

  12. A grid job monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Dumitrescu, Catalin; /Fermilab; Nowack, Andreas; /Aachen, Tech. Hochsch.; Padhi, Sanjay; /UC, San Diego; Sarkar, Subir; /INFN, Pisa /Pisa, Scuola Normale Superiore

    2010-01-01

    This paper presents a web-based Job Monitoring framework for individual Grid sites that allows users to follow in detail their jobs in quasi-real time. The framework consists of several independent components: (a) a set of sensors that run on the site CE and worker nodes and update a database, (b) a simple yet extensible web services framework and (c) an Ajax powered web interface having a look-and-feel and control similar to a desktop application. The monitoring framework supports LSF, Condor and PBS-like batch systems. This is one of the first monitoring systems where an X.509 authenticated web interface can be seamlessly accessed by both end-users and site administrators. While a site administrator has access to all the possible information, a user can only view the jobs for the Virtual Organizations (VO) he/she is a part of. The monitoring framework design supports several possible deployment scenarios. For a site running a supported batch system, the system may be deployed as a whole, or existing site sensors can be adapted and reused with the web services components. A site may even prefer to build the web server independently and choose to use only the Ajax powered web interface. Finally, the system is being used to monitor a glideinWMS instance. This broadens the scope significantly, allowing it to monitor jobs over multiple sites.

  13. Modular Biometric Monitoring System

    Science.gov (United States)

    Chmiel, Alan J. (Inventor); Humphreys, Bradley T. (Inventor)

    2017-01-01

    A modular system for acquiring biometric data includes a plurality of data acquisition modules configured to sample biometric data from at least one respective input channel at a data acquisition rate. A representation of the sampled biometric data is stored in memory of each of the plurality of data acquisition modules. A central control system is in communication with each of the plurality of data acquisition modules through a bus. The central control system is configured to control communication of data, via the bus, with each of the plurality of data acquisition modules.

  14. Installation and cosmic ray test of the high voltage system of the BESⅢdrift chamber

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    After examination of the designed high voltage power supply system of the BESⅢ drift chamber in the beam test of the full length prototype of drift chamber,a full system covering all the channels of high voltage was installed.The system's training and the high voltage value adjustment were carried out in the cosmic ray test of the BESⅢ drift chamber.The cosmic ray test for the full system and its final installation on the BESⅢ drift chamber were reported.The full system of high voltage power supply works stably and reliably.

  15. Solar Heating System installed at Belz Investment Company, Memphis, Tennessee

    Science.gov (United States)

    1981-01-01

    A hot air solar system which utilizes flat plate air collectors is discussed. Collector areas for each of four buildings cover 780 sq ft, with storage capacity of 390 cu ft per building. The air system has a special air handling unit to move air through the collectors and into and out of the rock storage, with connection to the air duct distribution system. The heat of the motor is added to the heat delivered to the system. The solar system also includes four motorized special low leakage dampers and two gravity fabric dampers. The system is automatically controlled by a solid state controller with three thermistors: one located in the collectors, one in the rock box to plenum, one in the return air duct from the heated space. A three stage heating thermostat, located in the conditioned space, controls the operation.

  16. A simple protocol using underwater epoxy to install annual temperature monitoring sites in rivers and streams

    Science.gov (United States)

    Daniel J. Isaak; Dona L. Horan; Sherry P. Wollrab

    2013-01-01

    Thermal regimes in rivers and streams are fundamental determinants of biological processes and are often monitored for regulatory compliance. Here, we describe a simple technique for establishing annual monitoring sites that uses underwater epoxy to attach miniature sensors to large rocks and cement bridge supports, which then serve as protective anchors. More than 500...

  17. BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION

    Energy Technology Data Exchange (ETDEWEB)

    Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

    2006-07-01

    SECTION 01000—SUMMARY OF WORK PART 1—GENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractor’s responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to

  18. Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations

    Energy Technology Data Exchange (ETDEWEB)

    Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

    2010-03-09

    This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

  19. Calibration of burnup monitor of spent nuclear fuel installed at Rokkasho reprocessing plant

    Energy Technology Data Exchange (ETDEWEB)

    Oeda, Kaoru; Matoba, Masaru; Wakabayashi, Genichiro [Kyushu Univ., Fukuoka (Japan). Faculty of Engineering; Naito, Hirofumi; Hirota, Masanari [Nuclear Fuel Industries Ltd., Tokyo (Japan); Morizaki, Hidetoshi; Kumanomido, Hironori; Natsume, Koichiro [Toshiba Corp., Tokyo (Japan)

    2001-05-01

    The spent nuclear fuel storage pool of Rokkasho reprocessing plant adopts the burnup credit' conception. Spent fuel assemblies are measured every one by one, by burnup monitors, and stored to a storage rack which is designed with specified residual enrichment. For nuclear criticality control, it is necessary for the burnup monitor that the measured value includes a kind of margin, which consists of errors of the monitor. In this paper, we describe the error of the burnup monitors, and the way of taking of the margin. From the result of calibration of the burnup monitor carried out from July through November, 1999, we describe that the way of taking of the margin is validated. And comments about possibility of error reduction are remarked. (author)

  20. PERFORMACE OF MULTI-PROBE CORROSION MONITORING SYSTEMS AT THE HANFORD SITE

    Energy Technology Data Exchange (ETDEWEB)

    CAROTHERS KD; BOOMER KD; ANDA VS; DAHL MM; EDGEMON GL

    2010-01-14

    Between 2007 and 2009, several different multi-probe corrosion monitoring systems were designed and installed in high-level nuclear waste tanks at the U.S. Department of Energy's Hanford Site in WaShington State. The probe systems are being monitored to ensure waste tanks operate in regions that minimize localized corrosion (i.e., pitting) and stress corrosion cracking. The corrosion monitoring systems have been installed in wastes with different chemistry types. An ongoing effort during the same time period has generated non-radioactive simulants that are tested in the laboratory to establish baseline corrosion monitoring system performance and characterize data to allow interpretation of readings from the multiple corrosion monitoring systems. Data collection from these monitoring systems has reached the point where the results allow comparison with the laboratory testing. This paper presents analytical results from the corrosion monitoring system development program.

  1. BES Monitoring & Displaying System

    Institute of Scientific and Technical Information of China (English)

    MengWANG; BingyunZHANG; 等

    2001-01-01

    BES1 Monitoring & Displaying System(BESMDS)is projected to monitor and display the running status of DAQ and Slow Control systems of BES through the Web for worldwide accessing.It provides a real-time remote means of monitoring as well as an approach to study the environmental influence upon physical data taking.The system collects real-time data separately from BES online subsystems by network sockets and stores the data into a database.People can access the system through its web site.which retrieves data on request from the database and can display results in dynamically created images.Its web address in http:// besmds,ihep.ac.cn/

  2. Installing a HDPE vertical containment and collection system in one pass utilizing a deep trencher

    Energy Technology Data Exchange (ETDEWEB)

    Bocchino, W.M. [Groundwater Control Inc., Jacksonville, FL (United States); Burson, B. [Groundwater Control, Houston, TX (United States)

    1997-12-31

    A unique method has been developed to install high density polyethylene (HDPE) vertical containment panels and a horizontal collection system for the containment and collection of contaminated groundwater. Unlike other means of creating this type of system, this barrier wall and collection system is installed in one step and in one narrow trench, utilizing a one-pass deep trencher. Originally HDPE vertical barriers were installed using conventional slurry trenching techniques. Use of this method raised questions of trench stability and disposal costs for the trench spoils. In addition, if a collection system was desired, a separate trench or vertical wells were required. In response to these concerns, a trenchless vibratory installation method was developed. Although this method addressed the concerns of trench stability and disposal costs, it raised a whole new set of concerns dealing with drivable soil conditions, buried debris and obstructions. Again, if a collection system was desired, a separate trench or vertical wells had to be installed. The latest development, the one-pass, deep trencher, has eliminated or significantly reduced the previously discussed construction concerns. The trencher methods reduce the amount of spoils generated because a trench width of 61 cm (24 inches) is constantly maintained by the machine. Additionally, soil classification and density are not as critical as with a vibratory installation. This is due to the trencher`s ability to trench in all but the hardest of materials (blow counts exceeding 35 blows/ft). Finally, the cost to add a collection system adjacent to the cutoff wall is substantially reduced and is limited only to the cost of the additional hydraulic fill and 4 inches HDPE collection piping. The trench itself is already constructed with the installation of the wall.

  3. Solar heating and domestic hot water system installed at North Dallas High School

    Science.gov (United States)

    1980-01-01

    The solar energy system located at the North Dallas High School, Dallas, Texas is discussed. The system is designed as a retrofit in a three story with basement, concrete frame high school building. Extracts from the site files, specification references for solar modification to existing building heating and domestic hot water systems, drawings, installation, operation and maintenance instructions are included.

  4. 40 CFR 281.30 - New UST system design, construction, installation, and notification.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false New UST system design, construction...-Stringent § 281.30 New UST system design, construction, installation, and notification. In order to be considered no less stringent than the corresponding federal requirements for new UST system...

  5. 14 CFR Appendix I to Part 25 - Installation of an Automatic Takeoff Thrust Control System (ATTCS)

    Science.gov (United States)

    2010-01-01

    ... Appendix I to Part 25—Installation of an Automatic Takeoff Thrust Control System (ATTCS) I25.1General. (a... crew to increase thrust or power. I25.2Definitions. (a) Automatic Takeoff Thrust Control System (ATTCS... Control System (ATTCS) I Appendix I to Part 25 Aeronautics and Space FEDERAL AVIATION...

  6. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Science.gov (United States)

    2010-07-01

    ... tank system is or will be in contact with the soil or with water, a determination by a corrosion expert... systems or components. 265.192 Section 265.192 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... TREATMENT, STORAGE, AND DISPOSAL FACILITIES Tank Systems § 265.192 Design and installation of new...

  7. Monitoring-well installation, slug testing, and groundwater quality for selected sites in South Park, Park County, Colorado, 2013

    Science.gov (United States)

    Arnold, Larry R. Rick

    2015-01-01

    During May–June, 2013, the U.S. Geological Survey, in cooperation with Park County, Colorado, drilled and installed four groundwater monitoring wells in areas identified as needing new wells to provide adequate spatial coverage for monitoring water quality in the South Park basin. Lithologic logs and well-construction reports were prepared for each well, and wells were developed after drilling to remove mud and foreign material to provide for good hydraulic connection between the well and aquifer. Slug tests were performed to estimate hydraulic-conductivity values for aquifer materials in the screened interval of each well, and groundwater samples were collected from each well for analysis of major inorganic constituents, trace metals, nutrients, dissolved organic carbon, volatile organic compounds, ethane, methane, and radon. Documentation of lithologic logs, well construction, well development, slug testing, and groundwater sampling are presented in this report.

  8. District Heating System Using Heat Pump Installations and CHP

    Directory of Open Access Journals (Sweden)

    Sit M.L.

    2015-12-01

    Full Text Available The article describes the district heating system, in which part of the heat of return water thermal power is used to supply heat to the district heating puThe article describes the district heating system, in which part of the heat of return water thermal power is used to supply heat to the district heating pumps, evaporators heating and hot water. Heat pumps use carbon dioxide as refrigerant. During the transitional period of the year, and the summer heat pump for preparing hot-water supply system uses the heat of the surrounding air. The heat of the ambient air is used in the intermediate heat exchanger between the first and second stages of the heat pump to cool the gas after the first stage of the compressor of the heat pump.

  9. Installation of Mechanical System of Beijing Spectrometer Ⅲ Successful

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ The mechanical system of the Beijing Spectrometer Ⅲ(BESⅢ) recently passed the evaluation of a panel of experts at the CAS Institute of High Energy Physics (IHEP) in Beijing, marking a breakthrough in the renovation of the Beijing Electron Positron Collider (BEPC).

  10. Wire system ageing assessment and condition monitoring (WASCO)

    Energy Technology Data Exchange (ETDEWEB)

    Fantoni, P.F. (Institute for Energy Technology (IFE) (Norway))

    2009-07-15

    Nuclear facilities rely on electrical wire systems to perform a variety of functions for successful operation. Many of these functions directly support the safe operation of the facility; therefore, the continued reliability of wire systems, even as they age, is critical. Condition Monitoring (CM) of installed wire systems is an important part of any aging program, both during the first 40 years of the qualified life and even more in anticipation of the license renewal for a nuclear power plant. This report contains the results of experiments performed in collaboration with Tecnatom SA, Spain, to compare several cable condition monitoring techniques including LIRA (LIne Resonance Analysis) (au)

  11. Design of multi-function Hanford tank corrosion monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    EDGEMON, G.L.

    1999-04-01

    A multi-fiction corrosion monitoring system has been designed for installation into DST 241-AN-105 at the Hanford Site in fiscal year 1999. The 241-AN-105 system is the third-generation corrosion monitoring system described by TTP RLO-8-WT-21. Improvements and upgrades from the second-generation system (installed in 241-AN-102) that have been incorporated into the third-generation system include: Gasket seating surfaces utilize O-rings instead of a washer type gasket for improved seal; Probe design contains an equally spaced array of 22 thermocouples; Probe design contains an adjustable verification thermocouple; Probe design contains three ports for pressure/gas sampling; Probe design contains one set of strain gauges to monitor probe flexure if flexure occurs; Probe utilizes an adjustable collar to allow depth adjustment of probe during installation; System is capable of periodically conducting LPR scans; System is housed in a climate controlled enclosure adjacent to the riser containing the probe; System uses wireless Ethernet links to send data to Hanford Local Area Network; System uses commercial remote access software to allow remote command and control; and Above ground wiring uses driven shields to reduce external electrostatic noise in the data. These new design features have transformed what was primarily a second-generation corrosion monitoring system into a multi-function tank monitoring system that adds a great deal of functionality to the probe, provides for a better understanding of the relationship between corrosion and other tank operating parameters, and optimizes the use of the riser that houses the probe in the tank.

  12. Installation and commissioning of a cryogen distribution system for the TPS project

    Science.gov (United States)

    Tsai, H. H.; Hsiao, F. Z.; Li, H. C.; Lin, M. C.; Wang, C.; Liao, W. R.; Lin, T. F.; Chiou, W. S.; Chang, S. H.; Chuang, P. S. D.

    2016-07-01

    A cryogen distribution system was installed and commissioned to transfer liquid nitrogen (LN2) and liquid helium (LHe) from storage dewars to superconducting radio-frequency (SRF) cavities for the 3-GeV Taiwan Photon Source (TPS) project. The cryogen distribution system comprises one distribution valve box (DVB), four control valve boxes (CVB) and seven sections of multichannel transfer line (MCL). The DVB distributes the LHe and LN2 to the CVB, and then to the SRF cavities through independent vacuum-jacketed transfer lines. The vaporized GHe and GN2 from the cryomodules are collected via the MCL. The cryogen distribution system was installed and commissioned from October 2014 to the end of March 2015. This paper presents the installation, pre-commissioning and commissioning of the cryogen distribution system, and describes the heat load test. Thermal acoustic oscillation (TAO) was found in the GHe process line; this phenomenon and its solution are also presented and discussed.

  13. An automatic system for controlling the quality of straws installed in the ATLAS TRT detector

    CERN Document Server

    Golunov, A O; Gousakov, Yu V; Kekelidze, G D; Livinski, V V; Mouraviev, S V; Parzycki, S S; Peshekhonov, V D; Price, M J; Savenkov, A A

    2004-01-01

    This article describes an automatic system to control the quality of straws installed in the wheels of the end-cap Transition Radiation Tracker of the ATLAS experiment. The system tests both the straightness and the electrical insulation of the straws during installation. The testing time per straw is 9s; consequently it takes about 2h to measure one layer of straws. The off-line analysis takes 20s per straw. With this system defects can be immediately detected and corrected. This clearly influences the future performance of the detector.

  14. Design, Observing and Data Systems, and Final Installation of the NEPTUNE Canada Regional Cabled Ocean Observatory

    Science.gov (United States)

    Barnes, C. R.; Best, M. M.; Johnson, F. R.; Phibbs, P.; Pirenne, B.

    2009-05-01

    /climate dynamics, including acidification and nutrient fluxes; deep-sea ecosystems dynamics; and engineering and computer science research. NC's software system interfaces between users and cabled observatory and responds to a three-fold mandate: acquire data from various instruments/sensors underwater; provide lifetime storage and redistribution capabilities for all data; and allow authorized users to remotely and interactively control experiments. Data Management and Archiving System (DMAS) is being developed in-house, with adoption of Service-Oriented Architecture (SOA) and using Web Services to expose the functionality of DMAS' various components. An internal messaging bus allows various functional components to interact through the publish and subscribe paradigm, using Java programming language. DMAS is developing a modern environment for users: data access, data processing and experimentation control within a Web 2.0 environment. This will allow users, on top of data and instrumentation access, to perform data visualization and analysis on-line with either default or custom processing code, as well as simultaneously interacting with each other. These social networking aspects will be within NC's new Oceans 2.0 environment. The observatory is designed to be expandable in its footprint, nodes and instruments and provides a magnificent facility for testing prototypes of new technologies monitored and demonstrated in real-time. NC and ONC invite new scientific and industrial participation, experiments, instrumentation and data services.

  15. Radionuclide monitoring in molluscs inhabiting intertidal region near a nuclear installation, Gulf of Mannar, India.

    Science.gov (United States)

    Khan, M Feroz; Wesley, S Godwin

    2012-02-01

    Protection of non-human biota from ionizing contaminants, especially in the vicinity of nuclear installations is a very important aspect for nuclear engineers and ecologists. In this view, a baseline data on the activity concentration of (210)Po and (210)Pb were quantified in different tissues of molluscs inhabiting the intertidal region along the coast of Kudankulam. The activity concentration was noticed higher in the organs associated with digestion and metabolism. Filter feeding bivalve molluscs registered the maximum activity of (210)Po in their whole body compared to grazing gastropods. (210)Po:(210)Pb ratio was calculated to be greater than unity in most of the analysed tissues. The ecological sensitivity of molluscs to the radiation exposure and the safeness of the environment was analysed by calculating the external and internal dose rate. The hazard quotient for molluscs was lesser than the global bench mark dose rate of 10 μGyh(-1).

  16. Solar heating and cooling system installed at Leavenworth, Kansas

    Science.gov (United States)

    1980-01-01

    A solar heating and cooling is described which is designed to furnish 90 percent of the overall heating load, 70 percent of the cooling load and 100 percent of the domestic hot water load. The building has two floors with a total of 12,000 square feet gross area. The system has 120 flat-plate liquid solar panels with a net area of 2,200 square feet. Five 3 ton Arkla solar assisted absorption units provide the cooling, in conjunction with a 3,000 gallon chilled water storage tank. Two 3,000 gallon storage tanks are provided with one designated for summer use, whereas both tanks are utilized during winter.

  17. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  18. A Low Cost Shading Analyzer and Site Evaluator Design to Determine Solar Power System Installation Area

    Directory of Open Access Journals (Sweden)

    Selami Kesler

    2015-01-01

    Full Text Available Shading analyzer systems are necessary for selecting the most suitable installation site to sustain enough solar power. Afterwards, changes in solar data throughout the year must be evaluated along with the identification of obstructions surrounding the installation site in order to analyze shading effects on productivity of the solar power system. In this study, the shading analysis tools are introduced briefly, and a new and different device is developed and explained to analyze shading effect of the environmental obstruction on the site on which the solar power system will be established. Thus, exposure duration of the PV panels to the sunlight can be measured effectively. The device is explained with an application on the installation area selected as a pilot site, Denizli, in Turkey.

  19. Power Transformer Intelligence Monitor System

    Institute of Scientific and Technical Information of China (English)

    Sun Jianshe; Shi Lei

    2006-01-01

    An auto-monitoring system has been created that could monitor the main parameter of power transformers. It reads data of V&I by precision rectifier circuit and amplifier, and converted electric energy into pulse signal by means of sensor technique and pulse converter circuit, it is sent into microcomputer to process, completed monitoring to power transformer parameters and running state by software system. It can register all kinds of key data, and provide all kinds of virtual technical data for managing sections and can auto-form all kinds of electric annual reports and monthly reports analysis graphs such as managing graphs. It notably improves the safety and reliability of transformer, with strong anti-jamming technique and unique function, it can be used on the transformers in railway' s self-closing lines and all kinds of transformer stations.

  20. Safety system installation on the underground gas storages wells of Nafta a.s.

    Directory of Open Access Journals (Sweden)

    Došek Ján

    2004-09-01

    Full Text Available Increasing of safety operation underground gas storage wells requires to install safety system on this wells to be protected against unwarranted activity. It is in correspondence with recommendation of European Standard EN 1918 1-5. Safety system describing in this article consists of surface controled subsurface safety valve, surface safety valve and control panel.

  1. Increasing reliability of system water heaters for steam-turbine installations at the design stage

    Science.gov (United States)

    Brezgin, V. I.; Brodov, Yu. M.; Brezgin, D. V.

    2015-12-01

    A system for designing water heaters of steam-turbine installations based on uniting standards, reference information, and some numerical procedures with design procedures via wide use of parameterization is considered. The developed design system is based on extensive application of modern information technologies.

  2. Phonocardiograph system monitors heart sounds

    Science.gov (United States)

    1966-01-01

    Phonocardiograph system monitors the mechanical activity of the heart in extreme environments. It uses a piezoelectric-crystal microphone with an integral preamplifier, and a signal conditioner having special frequency characteristics. The output signals can be recorded on tape, presented aurally, or transmitted telemetrically to a remote station.

  3. AET III 100 kWp photovoltaic installation in Riazzino - Results of monitoring; Monitoraggio dell'impianto PV da 100 kWp AET III a Riazzino

    Energy Technology Data Exchange (ETDEWEB)

    Rezzonico, S.; Bura, E.

    2005-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a monitoring project that monitored the performance of the 100 kWp, grid-connected photovoltaic installation in Riazzino in southern Switzerland. The original installation, dating from 1992, was refurbished with three new inverters and new cabling. The results of a three-year monitoring project are presented and discussed. Figures are presented on the plant's power production, which illustrate the improved performance of the new inverters. Further investigations made on the power ratings of the modules and the results of infrared examination are discussed.

  4. Embedded multiparametric system for volcano monitoring

    Science.gov (United States)

    Moure, David; Torres, Pedro A.; Meletlidis, Stavros; Lopez, Carmen; José Blanco, María

    2014-05-01

    A low cost and low power consumption multiparametric system designed for volcano monitoring is presented. Once tested with various sensors, at present it is installed in two locations in Tenerife, Canary Islands, acquiring and transmitting data in real time. The system is based on a commercial board (Raspberry Pi®, RPi®) that uses an embedded ARMTM processor with a Debian (Wheezy-Raspbian) Linux Operating System. This configuration permits different standard communication systems between devices as USB and ETHERNET, and also communication with integrated circuits is possible. The whole system includes this platform and self-developed hardware and software. Analog signals are acquired at an expansion board with an ADC converter with three 16 bits channels. This board, which is powered directly from the RPi®, provides timing to the sampling data using a Real Time Clock (RTC). Two serial protocols (I2C and SPI) are responsible for communications. Due to the influence of atmospheric phenomena on the volcano monitoring data, the system is complemented by a self-developed meteorological station based on ArduinoCC and low cost commercial sensors (atmospheric pressure, humidity and rainfall). It is powered with the RPi® and it uses a serial protocol for communications. Self-developed software run under Linux OS and handles configuration, signal acquisition, data storage (USB storage or SD card) and data transmission (FTP, web server). Remote configuration, data plotting and downloading is available through a web interface tool. Nowadays, the system is used for gravimetric and oceanic tides data acquisition in Tenerife and soon it will be applied for clinometric data.

  5. Evaluation of 20 years of environmental monitoring data around Swedish nuclear installations.

    Science.gov (United States)

    Wallberg, Petra; Moberg, Leif

    2002-01-01

    Twenty years of environmental monitoring data around the Swedish nuclear power plants and the Studsvik research facilities have been evaluated. In the marine environment, Fucus vesiculosus generally has high activity concentrations and the presence of a large variety of radionuclides in comparison with other bioindicators. However, for single nuclides the detection frequency was higher for 110mAg in Littorina spp and for 152Eu in Macoma baltica in comparison with other bioindicators. Close to the discharge point the activity concentration of 60Co in F. vesiculosus and in the discharge water were correlated. In the terrestrial environment, few radionuclides were detected and the activity concentrations were generally low. Of the terrestrial indicators, mosses had the highest activity concentrations and also comprised the largest variety of radionuclides. The radiation doses to humans based on measurements of released activity were small. Based on the results from the evaluation, alternative sampling strategies for the monitoring program are discussed.

  6. Energy Monitoring System Berbasis Web

    Directory of Open Access Journals (Sweden)

    Novan Zulkarnain

    2013-12-01

    Full Text Available Government through the Ministry of Energy and Mineral Resources (ESDM encourages the energy savings at whole buildings in Indonesia. Energy Monitoring System (EMS is a web-based solution to monitor energy usage in a building. The research methods used are the analysis, prototype design and testing. EMSconsists of hardware which consists of electrical sensors, temperature-humidity sensor, and a computer. Data on EMS are designed using Modbus protocol, stored in MySQL database application, and displayed on charts through Dashboard on LED TV using PHP programming.

  7. Statement of Work Electrical Energy Storage System Installation at Sandia National Laboratories.

    Energy Technology Data Exchange (ETDEWEB)

    Schenkman, Benjamin L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    Sandia is seeking to procure a 1 MWh energy storage system. It will be installed at the existing Energy Storage Test Pad, which is located at Sandia National Laboratories in Albuquerque, New Mexico. This energy storage system will be a daily operational system, but will also be used as a tool in our Research and development work. The system will be part of a showcase of Sandia distributed energy technologies viewed by many distinguished delegates.

  8. International Remote Monitoring Project Embalse Nuclear Power Station, Argentina Embalse Remote Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, Sigfried L.; Glidewell, Donnie D.; Bonino, Anibal; Bosler, Gene; Mercer, David; Maxey, Curt; Vones, Jaromir; Martelle, Guy; Busse, James; Kadner, Steve; White, Mike; Rovere, Luis

    1999-07-21

    The Autoridad Regulatoria Nuclear of Argentina (ARN), the International Atomic Energy Agency (IAEA), ABACC, the US Department of Energy, and the US Support Program POTAS, cooperated in the development of a Remote Monitoring System for nuclear nonproliferation efforts. This system was installed at the Embalse Nuclear Power Station last year to evaluate the feasibility of using radiation sensors in monitoring the transfer of spent fuel from the spent fuel pond to dry storage. The key element in this process is to maintain continuity of knowledge throughout the entire transfer process. This project evaluated the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguard efficiency. New technology has been developed to enhance the design of the system to include storage capability on board sensor platforms. This evaluation has led to design enhancements that will assure that no data loss will occur during loss of RF transmission of the sensors.

  9. Design Optimization of Structural Health Monitoring Systems

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, Eric B. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-06

    Sensor networks drive decisions. Approach: Design networks to minimize the expected total cost (in a statistical sense, i.e. Bayes Risk) associated with making wrong decisions and with installing maintaining and running the sensor network itself. Search for optimal solutions using Monte-Carlo-Sampling-Adapted Genetic Algorithm. Applications include structural health monitoring and surveillance.

  10. An integrated system for pipeline condition monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Strong, Andrew P.; Lees, Gareth; Hartog, Arthur; Twohig, Richard; Kader, Kamal; Hilton, Graeme; Mullens, Stephen; Khlybov, Artem [Schlumberger, Southampton (United Kingdom); Sanderson, Norman [BP Exploration, Sunbury (United Kingdom)

    2009-07-01

    monitoring in a wide range of other applications such as: long sub sea flow lines; offshore riser systems; settlement in tank farms; facilities perimeter security. An important element of this system is a bespoke direct-bury optical sensor cable, designed to allow distributed strain measurement and hence enable monitoring of ground movement, whilst withstanding the rigors of the pipeline environment. The system can also be configured for detection of third-party interference and leaks with the majority of existing buried cables. In this paper, we outline the optical sensing methods employed in the system, and the results of the extensive field trials performed to fully evaluate and prove the system for use on long hydrocarbon transmission pipelines. Specifically, we will describe the detection of small gas releases, simulated ground movement and detection and recognition of a number of different types of third party interventions at the full 100 km target range. Finally, the tracking of a pig during pigging operations is demonstrated on a pilot installation. (author)

  11. The NASA Carbon Monitoring System

    Science.gov (United States)

    Hurtt, G. C.

    2015-12-01

    Greenhouse gas emission inventories, forest carbon sequestration programs (e.g., Reducing Emissions from Deforestation and Forest Degradation (REDD and REDD+), cap-and-trade systems, self-reporting programs, and their associated monitoring, reporting and verification (MRV) frameworks depend upon data that are accurate, systematic, practical, and transparent. A sustained, observationally-driven carbon monitoring system using remote sensing data has the potential to significantly improve the relevant carbon cycle information base for the U.S. and world. Initiated in 2010, NASA's Carbon Monitoring System (CMS) project is prototyping and conducting pilot studies to evaluate technological approaches and methodologies to meet carbon monitoring and reporting requirements for multiple users and over multiple scales of interest. NASA's approach emphasizes exploitation of the satellite remote sensing resources, computational capabilities, scientific knowledge, airborne science capabilities, and end-to-end system expertise that are major strengths of the NASA Earth Science program. Through user engagement activities, the NASA CMS project is taking specific actions to be responsive to the needs of stakeholders working to improve carbon MRV frameworks. The first phase of NASA CMS projects focused on developing products for U.S. biomass/carbon stocks and global carbon fluxes, and on scoping studies to identify stakeholders and explore other potential carbon products. The second phase built upon these initial efforts, with a large expansion in prototyping activities across a diversity of systems, scales, and regions, including research focused on prototype MRV systems and utilization of COTS technologies. Priorities for the future include: 1) utilizing future satellite sensors, 2) prototyping with commercial off-the-shelf technology, 3) expanding the range of prototyping activities, 4) rigorous evaluation, uncertainty quantification, and error characterization, 5) stakeholder

  12. Scientific Comparison of Different Online Heart Rate Monitoring Systems

    Directory of Open Access Journals (Sweden)

    Martin Schönfelder

    2011-01-01

    Full Text Available Recent technical development focused on real-time heart rate monitoring instead of postexercise evaluation of recorded data. There are several systems on the market that allow direct and real-time monitoring of several individuals at the same time. The present study compared the systems of Polar, Acentas, Activio, and Suunto in a field test with twelve subjects regarding failure quota, operating distance, and ECG validity. Moreover, the installation and use of software and hardware were evaluated with a quality rating system. Chest belts were evaluated with a questionnaire, too. Overall the system of Acentas reached the best mark of all systems, but detailed results showed that every system has its advantages and disadvantages depending on using purpose, location, and weather. So this evaluation cannot recommend a single system but rather shows strength and weakness of all systems and additionally can be used for further system improvements.

  13. 29 CFR 1954.2 - Monitoring system.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System....

  14. Software Oriented Data Monitoring System

    CERN Document Server

    K, Phani Nandan

    2010-01-01

    This project "Software Oriented Data Monitoring System" deals with real time monitoring of patients' parameters like body temperature, heart rate etc. The parameters are checked at regular intervals and Short Messaging Service (SMS) is sent to concerned doctor regarding the measured values. If the obtained parameters are above or below critical values, an alert SMS is also sent to the concerned doctor. This system is very much useful in hospitals, which saves the valuable time of the doctor who otherwise will have to monitor the patients throughout the day. Here the analog data from the sensors is first converted into digital form and is fed to the parallel port of the computer. This data obtained is converted into useful parameters, which is monitored and checked for safe limits. Appropriate SMS is sent to the doctor depending on whether the request is from an alert or routine signal. This is possible by interfacing a mobile phone (Siemens c35i) to the serial port of the computer. The SMS is sent from the co...

  15. Investigation, Installation and Implementation of an Open Source Content Management System : Joomla as a case study

    OpenAIRE

    Obatolu, Adekunle

    2010-01-01

    The objective of this thesis was to investigate, install and implement the open source content management system Joomla for Vaasa Centre of Open Source Solutions. They are actually looking for a universal CMS that can be used as web portal or web shop or web bookings. The initial CMS being used by the centre lacks some of their required features. The Linux Apache MySQL and PHP, LAMP server was installed in order to run the Joomla CMS on it. I was able to implements the required features t...

  16. Corral Monitoring System assessment results

    Energy Technology Data Exchange (ETDEWEB)

    Filby, E.E.; Haskel, K.J.

    1998-03-01

    This report describes the results of a functional and operational assessment of the Corral Monitoring Systems (CMS), which was designed to detect and document accountable items entering or leaving a monitored site. Its development was motivated by the possibility that multiple sites in the nuclear weapons states of the former Soviet Union might be opened to such monitoring under the provisions of the Strategic Arms Reduction Treaty. The assessment was performed at three levels. One level evaluated how well the planned approach addressed the target application, and which involved tracking sensitive items moving into and around a site being monitored as part of an international treaty or other agreement. The second level examined the overall design and development approach, while the third focused on individual subsystems within the total package. Unfortunately, the system was delivered as disassembled parts and pieces, with very poor documentation. Thus, the assessment was based on fragmentary operating data coupled with an analysis of what documents were provided with the system. The system design seemed to be a reasonable match to the requirements of the target application; however, important questions about site manning and top level administrative control were left unanswered. Four weaknesses in the overall design and development approach were detected: (1) poor configuration control and management, (2) inadequate adherence to a well defined architectural standard, (3) no apparent provision for improving top level error tolerance, and (4) weaknesses in the object oriented programming approach. The individual subsystems were found to offer few features or capabilities that were new or unique, even at the conceptual level. The CMS might possibly have offered a unique combination of features, but this level of integration was never realized, and it had no unique capabilities that could be readily extracted for use in another system.

  17. Evaluation of a reverberation enhancement system installed in a small multi purpose hall

    DEFF Research Database (Denmark)

    Gade, Anders Christian

    1997-01-01

    After design and installation of a reverberation enhancement system in new 400 seat multi purpose hall in Vejle, Denmark. room acoustic measurements and listening tests were performed in order to reveal the objective and subjective performance and limits of such a powerful tool for altering ''roo...

  18. Solar heating and cooling of residential buildings: sizing, installation and operation of systems. 1980 edition

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This manual was prepared as a text for a training course on solar heating and cooling of residential buildings. The course and text are directed toward sizing, installation, operation, and maintenance of solar systems for space heating and hot water supply, and solar cooling is treated only briefly. (MHR)

  19. The Southwest Research Institute's SWUIS-A digital imaging system was installed on the instrument pa

    Science.gov (United States)

    2002-01-01

    The Southwest Research Institute's SWUIS-A digital imaging system, including a sophisticated Xybion camera and associated control equipment, was installed on the instrument panel of a NASA Dryden F/A-18B for a series of astronomy flights to search for tiny vulcanoids (asteroids) that may be circling between the orbit of Mercury and the sun.

  20. Training Community College faculty in the techniques and skills required for Solar Energy System installation

    Energy Technology Data Exchange (ETDEWEB)

    Leo, R.J.

    1980-05-01

    A project to train a specified number of community college, vocational/technical faculty in the techniques and skills required to install solar energy systems is described. The planning that led to the contract, the development and conduct of the training workshops, and the outcomes are detailed. An overall evaluation of the project and recommendations for the future are included. (MHR)

  1. 30 CFR 75.1103-4 - Automatic fire sensor and warning device systems; installation; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Automatic fire sensor and warning device...-UNDERGROUND COAL MINES Fire Protection § 75.1103-4 Automatic fire sensor and warning device systems; installation; minimum requirements. (a) Effective December 31, 2009, automatic fire sensor and warning device...

  2. Installation and field trials of pump turbine for standalone power generation for PICO HYDEL system

    Energy Technology Data Exchange (ETDEWEB)

    Chetwani, S.H. [Electrical Research and Development Association, Vadodara, Gujarat (India)

    2010-07-01

    The installation and field trials of pump turbines for standalone power generation for a pico hydel system were discussed in this presentation. Background on the project was first presented. The technology was best suited for distributed generation. The presentation discussed the installation of the unit at the Galibidu Gram Panchayat in the Coorg District of Karnataka in India. An estimate was also provided. Laboratory trials were outlined and site performance was discussed. The total head available at the site was 74 metres. Ten houses were electrified with this unit in the first phase. Three cfls of 15 watts each were energized in each house. It was concluded that in the second phase, it was planned to install a 14 inch television in each house. figs.

  3. Solar heating and hot water system installed at Cherry Hill, New Jersey

    Science.gov (United States)

    1979-01-01

    The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.

  4. Hypoxia, Monitoring, and Mitigation System

    Science.gov (United States)

    2015-08-01

    When compared to max VO2 as derived from a person’s two-mile run an indication of personalized capacity state can be generated which can also be...Monitoring, Alert and Mitigation System HR Heart Rate HRC Heart Rate Complexity HW Hardware IDR Initial Design Review K Thousand m Meters max Maximum... reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of

  5. Reliability of sprinkler systems. Exploration and analysis of data from nuclear and non-nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Roenty, V.; Keski-Rahkonen, O.; Hassinen, J.P. [VTT Building and Transport, Espoo (Finland)

    2004-12-01

    Sprinkler systems are an important part of fire safety of nuclear installations. As a part of effort to make fire-PSA of our utilities more quantitative a literature survey from open sources worldwide of available reliability data on sprinkler systems was carried out. Since the result of the survey was rather poor quantitatively, it was decided to mine available original Finnish nuclear and non-nuclear data, since nuclear power plants present a rather small device population. Sprinklers are becoming a key element for the fire safety in modern, open non-nuclear buildings. Therefore, the study included both nuclear power plants and non-nuclear buildings protected by sprinkler installations. Data needed for estimating of reliability of sprinkler systems were collected from available sources in Finnish nuclear and non-nuclear installations. Population sizes on sprinkler system installations and components therein as well as covered floor areas were counted individually from Finnish nuclear power plants. From non-nuclear installations corresponding data were estimated by counting relevant things from drawings of 102 buildings, and plotting from that sample needed probability distributions. The total populations of sprinkler systems and components were compiled based on available direct data and these distributions. From nuclear power plants electronic maintenance reports were obtained, observed failures and other reliability relevant data were selected, classified according to failure severity, and stored on spreadsheets for further analysis. A short summary of failures was made, which was hampered by a small sample size. From non-nuclear buildings inspection statistics from years 1985.1997 were surveyed, and observed failures were classified and stored on spreadsheets. Finally, a reliability model is proposed based on earlier formal work, and failure frequencies obtained by preliminary data analysis of this work. For a model utilising available information in the non

  6. Testing an Open Source installation and server provisioning tool for the INFN CNAF Tierl Storage system

    Science.gov (United States)

    Pezzi, M.; Favaro, M.; Gregori, D.; Ricci, P. P.; Sapunenko, V.

    2014-06-01

    In large computing centers, such as the INFN CNAF Tier1 [1], is essential to be able to configure all the machines, depending on use, in an automated way. For several years at the Tier1 has been used Quattor[2], a server provisioning tool, which is currently used in production. Nevertheless we have recently started a comparison study involving other tools able to provide specific server installation and configuration features and also offer a proper full customizable solution as an alternative to Quattor. Our choice at the moment fell on integration between two tools: Cobbler [3] for the installation phase and Puppet [4] for the server provisioning and management operation. The tool should provide the following properties in order to replicate and gradually improve the current system features: implement a system check for storage specific constraints such as kernel modules black list at boot time to avoid undesired SAN (Storage Area Network) access during disk partitioning; a simple and effective mechanism for kernel upgrade and downgrade; the ability of setting package provider using yum, rpm or apt; easy to use Virtual Machine installation support including bonding and specific Ethernet configuration; scalability for managing thousands of nodes and parallel installations. This paper describes the results of the comparison and the tests carried out to verify the requirements and the new system suitability in the INFN-T1 environment.

  7. A development of ITV system for power transmission line monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Hong Keun; Kim, Seok Ku; Lee, Kwang Joong; Lee, Won Bin [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1995-12-31

    Transmission lines which are important to supply the electricity installed on the terrestrially severe site such as mountains needed to be monitored to prevent electric fault by snow accelerating, icing, tree contact, fire etc. Inspections by human patrol has been done but it seems not so efficient and satisfiable. To cope with this a transmission line monitoring system using industrial television and OPGW was developed and field trilled at the site. This paper describes about the optical video transceiver, video distributor and control devices (author).

  8. Coastwide Reference Monitoring System (CRMS)

    Science.gov (United States)

    2010-01-01

    In 1990, the U.S. Congress enacted the Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) in response to growing awareness of a land loss crisis in Louisiana. Projects funded by CWPPRA require monitoring and evaluation of project effectiveness, and there is also a need to assess the cumulative effects of all projects to achieve a sustainable coastal environment. In 2003, the Louisiana Office of Coastal Protection and Restoration (OCPR) and the U.S. Geological Survey (USGS) received approval from the CWPPRA Task Force to implement the Coastwide Reference Monitoring System (CRMS) as a mechanism to monitor and evaluate the effectiveness of CWPPRA projects at the project, region, and coastwide levels. The CRMS design implements a multiple reference approach by using aspects of hydrogeomorphic functional assessments and probabilistic sampling. The CRMS program is as dynamic as the coastal habitats it monitors. The program is currently funded through CWPPRA and provides data for a variety of user groups, including resource managers, academics, landowners, and researchers.

  9. Shielding of a room for installation of a calibration service for neutron monitors

    Energy Technology Data Exchange (ETDEWEB)

    Medeiros, Marcos P.C. de; Estrada, Julio J.S.; Santos, Raphael F.G. dos [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil); Junior, Wilson F.R.S.; Gomes, Renato G.; Alves, Carlos F.E. [Universidade do Estado do Rio de Janeiro (UERJ), Rio de Janeiro, RJ (Brazil); Silva, Ademir X. da, E-mail: eng.cavaliere@gmail.com, E-mail: jsestrada@bol.com.br, E-mail: renatoguedes@ime.eb.br, E-mail: faelfisica@gmail.com, E-mail: jsestrada@bol.com.br, E-mail: wilsonrebello@gmail.com, E-mail: cfealves@gmail.com, E-mail: ademir@nuclear.ufrj.br [Coordenacao dos Programas de Pos-Graduacao de Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil)

    2013-07-01

    The Laboratorio de Ciencias Radiologicas (LCR) from Instituto de Biologia Roberto Alcantara Gomes (IBRAG/UERJ) is enhancing its metrological laboratory, implementing a set up for neutron monitor calibration. Considering the available space on site, it was decided to carry out the necessary adjustments to attend the regulatory rules for radiation protection. The Monte Carlo approach has been adopted using the MCNPX computer code, several measurements of the ambient dose equivalent were simulated to check if the areas surrounding the calibration room could still be classified as radiation free. In order to decrease the irradiation field, it was also simulated a shielding where a 185 GBq neutron source of {sup 241}Am-Be was inserted into. The dimensions of the simulated irradiator are large enough to guarantee that the individuals occupationally exposed do not have dose above the limit established by Brazilian authority, outside of the beam irradiation. The total ambient dose equivalent calculated using MCNPX shows that 3.8 cm of 5% borated polyethylene or 5.5 cm of concrete gives the necessary shielding to guarantee as radiation free all areas surrounding the calibration room. (author)

  10. Monitoring of damage on water–cooled cables installed in the Large Hadron Collider (CERN) and research on possible alternatives.

    CERN Document Server

    Wollmann, Alexander; Guillaume, J C; Ricci, D

    To supply the superconducting magnets in the Large Hadron Collider at CERN, several thousand metres of water–cooled cables were installed. These cables consist of a flexible copper core surrounded by a reinforced rubber hose. Although the hose material has been selected carefully, on many cables the rubber hose has suffered from damage. After giving a general overview on common rubber materials and known reasons for their ageing, the technology of water–cooled cables and their special requirements will be introduced. Then, the aim of this thesis is to present the monitoring of the damage on the rubber hoses. This includes an introduction to the monitoring technique used, followed by an analysis and discussion of the results obtained. As a different way of investigating the damage, a pressure test for the rubber hose will be proposed and specified; and the possibility of using alternative conductors for the current supply of the LHC main magnets will be examined. Finally, a series of radiation tests on pot...

  11. Handbook of experiences in the design and installation of solar heating and cooling systems

    Energy Technology Data Exchange (ETDEWEB)

    Ward, D.S.; Oberoi, H.S.

    1980-07-01

    A large array of problems encountered are detailed, including design errors, installation mistakes, cases of inadequate durability of materials and unacceptable reliability of components, and wide variations in the performance and operation of different solar systems. Durability, reliability, and design problems are reviewed for solar collector subsystems, heat transfer fluids, thermal storage, passive solar components, piping/ducting, and reliability/operational problems. The following performance topics are covered: criteria for design and performance analysis, domestic hot water systems, passive space heating systems, active space heating systems, space cooling systems, analysis of systems performance, and performance evaluations. (MHR)

  12. Shared performance monitor in a multiprocessor system

    Science.gov (United States)

    Chiu, George; Gara, Alan G; Salapura, Valentina

    2014-12-02

    A performance monitoring unit (PMU) and method for monitoring performance of events occurring in a multiprocessor system. The multiprocessor system comprises a plurality of processor devices units, each processor device for generating signals representing occurrences of events in the processor device, and, a single shared counter resource for performance monitoring. The performance monitor unit is shared by all processor cores in the multiprocessor system. The PMU is further programmed to monitor event signals issued from non-processor devices.

  13. Design and Installation of a 10 MeV Small Medical Cyclotron Electrical System

    Institute of Scientific and Technical Information of China (English)

    CAI; Hong-ru; GE; Tao; WU; Long-cheng; LI; Zheng-guo; LIU; Geng-shou

    2012-01-01

    <正>The electrical and pneumatic system of the 10 MeV small medical cyclotron is to provide safe and reliable power supply and relay protection to ensure the stable operation of equipments as well as personnel safety. Based on the equipment installation and operation status of the machine, the computational load of electrical system is designed to be 130 kW. The load grade is three-level, which adopts three-phase

  14. Solar energy system installed at the North Georgia APDC office building

    Energy Technology Data Exchange (ETDEWEB)

    1979-08-01

    Information is provided on the solar energy system installed in the newly constructed office building of the North Georgia Area Planning and Development Commission near downtown Dalton, Georgia. This solar heating, cooling and hot water system supplies 65 to 70% of the cooling demand and 90 to 95% of the heating demand. There are 2,001 square feet of effective Revere collector area, and the absorption chiller is in Arkla model 300 and provides 16 tons of cooling.

  15. Vulnerability analysis for design of bridge health monitoring system

    Science.gov (United States)

    Sun, L. M.; Yu, G.

    2010-03-01

    The recent engineering implementation of health monitoring system for long span bridges show difficulties for precisely assessing structural physical condition as well as for accurately alarming on structural damages, although hundreds of sensors were installed on a structure and a great amount of data were collected from the monitoring system. The allocation of sensors and the alarming algorithm are still two of the most important tasks to be considered when designing the structural health monitoring system. Vulnerability, in its original meaning, is the system susceptibility to local damage. For a structural system, the vulnerability can thus be regarded as structural performance susceptibility to local damage of structure. The purpose of this study is to propose concepts and methods of structural vulnerability for determining monitoring components which are more vulnerable than others and the corresponding warning threshold once the damages occur. The structural vulnerability performances to various damage scenarios depend upon structural geometrical topology, loading pattern on the structure and the degradation of component performance. A two-parameters structural vulnerability evaluation method is proposed in this paper. The parameters are the damage consequence and the relative magnitude of the damage scenarios to the structural system, respectively. Structural vulnerability to various damage scenarios can be regarded as the tradeoff between the two parameters. Based on the results of structural vulnerability analysis, the limited structural information from health monitoring can be utilized efficiently. The approach of the design of bridge health monitoring system is illustrated for a cable-stayed bridge.

  16. DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Martin E. Cobern

    2004-08-31

    The deep hard rock drilling environment induces severe vibrations into the drillstring, which can cause reduced rates of penetration (ROP) and premature failure of the equipment. The only current means of controlling vibration under varying conditions is to change either the rotary speed or the weight-on-bit (WOB). These changes often reduce drilling efficiency. Conventional shock subs are useful in some situations, but often exacerbate the problems. The objective of this project is development of a unique system to monitor and control drilling vibrations in a ''smart'' drilling system. This system has two primary elements: (1) The first is an active vibration damper (AVD) to minimize harmful axial, lateral and torsional vibrations. The hardness of this damper will be continuously adjusted using a robust, fast-acting and reliable unique technology. (2) The second is a real-time system to monitor drillstring vibration, and related parameters. This monitor adjusts the damper according to local conditions. In some configurations, it may also send diagnostic information to the surface via real-time telemetry. The AVD is implemented in a configuration using magnetorheological (MR) fluid. By applying a current to the magnetic coils in the damper, the viscosity of the fluid can be changed rapidly, thereby altering the damping coefficient in response to the measured motion of the tool. Phase I of this program entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype. Phase I of the project was completed by the revised end date of May 31, 2004. The objectives of this phase were met, and all prerequisites for Phase II have been completed.

  17. DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Martin E. Cobern

    2004-08-31

    The deep hard rock drilling environment induces severe vibrations into the drillstring, which can cause reduced rates of penetration (ROP) and premature failure of the equipment. The only current means of controlling vibration under varying conditions is to change either the rotary speed or the weight-on-bit (WOB). These changes often reduce drilling efficiency. Conventional shock subs are useful in some situations, but often exacerbate the problems. The objective of this project is development of a unique system to monitor and control drilling vibrations in a ''smart'' drilling system. This system has two primary elements: (1) The first is an active vibration damper (AVD) to minimize harmful axial, lateral and torsional vibrations. The hardness of this damper will be continuously adjusted using a robust, fast-acting and reliable unique technology. (2) The second is a real-time system to monitor drillstring vibration, and related parameters. This monitor adjusts the damper according to local conditions. In some configurations, it may also send diagnostic information to the surface via real-time telemetry. The AVD is implemented in a configuration using magnetorheological (MR) fluid. By applying a current to the magnetic coils in the damper, the viscosity of the fluid can be changed rapidly, thereby altering the damping coefficient in response to the measured motion of the tool. Phase I of this program entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype. Phase I of the project was completed by the revised end date of May 31, 2004. The objectives of this phase were met, and all prerequisites for Phase II have been completed.

  18. Final work plan : targeted groundwater sampling and monitoring well installation for potential site reclassification at Barnes, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-07-11

    This ''Work Plan'' outlines the scope of work for a targeted groundwater sampling investigation and monitoring well installation at Barnes, Kansas. This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with the intergovernmental agreement between the KDHE and the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA). Data resulting from the proposed work will be used to determine the hydraulic gradient near the former CCC/USDA facility, delineate the downgradient carbon tetrachloride plume, and determine additional monitoring requirements at Barnes. The overall goal is to establish criteria for monitoring leading to potential site reclassification. The proposed work will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The Farm Service Agency of the USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a ''Master Work Plan'' (Argonne 2002) to provide general guidance for all investigations at former CCC/USDA facilities in Kansas. The ''Master Work Plan'', approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Barnes.

  19. Influence of the Selected Parameters on the Effectiveness of IGCC System Integrated With CCS Installation

    Directory of Open Access Journals (Sweden)

    Skorek-Osikowska Anna

    2014-06-01

    Full Text Available The paper presents the basic input data and modelling results of IGCC system with membrane CO2 capture installation and without capture. The models were built using commercial software (Aspen and GateCycle and with the use of authors’ own computational codes. The main parameters of the systems were calculated, such as gross and net power, auxiliary power of individual installations and efficiencies. The models were used for the economic and ecological analysis of the systems. The Break Even Point method of analysis was used. The calculations took into account the EU emissions trading scheme. Sensitivity analysis on the influence of selected quantities on break-even price of electricity was performed

  20. Automatic respiration monitoring system; Shushin jotai no jido monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This is a system to recognize automatically status of a person in sleep including respiration stop, toss about in bed, and departure from the bed by performing animated image processing on images of the person in sleep as photographed by a camera, and by obtaining respiration waveforms from changes in the images of the breast. The system has been developed jointly by the Medical Department of Ehime University and Toshiba Engineering Company when commissioned from the Silver Service Promotion Association as a two-year project. The system requires no operation by an operator, can monitor the respiration during sleep on a real time basis from a completely non-restraint condition, and can be utilized for early discovery of crib death and/or apneic syndrome of aged persons and infants. Its effectiveness was verified by the field tests at a special facility for physically and mentally handicapped aged persons. The system was awarded with the first grand prize for an image recognition system from the Japan Automatic Recognition System Association. (translated by NEDO)

  1. Executing the double win: protect your cash flow during a patient accounting system install.

    Science.gov (United States)

    Adams, Jason L; Smith, J Cathy; Strand, Brett

    2009-09-01

    MultiCare Health System's plan for ensuring that its patient accounting system implementation would bring rapid financial benefits comprised eight basic steps: Set baselines and establish goals. Identify key leadership stakeholders across departmental lines. Identify team resources. Establish roles and responsibilities. Identify and prepare for potential risks. Develop guiding principles. Develop key reporting and monitoring tools. Conduct daily monitoring.

  2. INSTALLING AN ERP SYSTEM WITH A METHODOLOGY BASED ON THE PRINCIPLES OF GOAL DIRECTED PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ioannis Zafeiropoulos

    2010-01-01

    Full Text Available This paper describes a generic methodology to support the process of modelling, adaptation and implementation (MAI of Enterprise Resource Planning Systems (ERPS based on the principles of goal directed project management (GDPM. The proposed methodology guides the project manager through specific stages in order to successfully complete the ERPS implementation. The development of the proper MAI methodology is deemed necessary because it will simplify the installation process of ERPS. The goal directed project management method was chosen since it provides a way of focusing all changes towards a predetermined goal. The main stages of the methodology are the promotion and preparation steps, the proposal, the contract, the implementation and the completion. The methodology was applied as a pilot application by a major ERPS development company. Important benefits were the easy and effective guidance for all installation and analysis stages, the faster installation for the ERPS and the control and cost reduction for the installation, in terms of time, manpower, technological equipment and other resources.

  3. INSTALLING AN ERP SYSTEM WITH A METHODOLOGY BASED ON THE PRINCIPLES OF GOAL DIRECTED PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ioannis Zafeiropoulos

    2009-12-01

    Full Text Available This paper describes a generic methodology to support the process of modelling, adaptation and implementation (MAI of Enterprise Resource Planning Systems (ERPS based on the principles of goal directed project management (GDPM. The proposed methodology guides the project manager through specific stages in order to successfully complete the ERPS implementation. The development of the proper MAI methodology is deemed necessary because it will simplify the installation process of ERPS. The goal directed project management method was chosen since it provides a way of focusing all changes towards a predetermined goal. The main stages of the methodology are the promotion and preparation steps, the proposal, the contract, the implementation and the completion. The methodology was applied as a pilot application by a major ERPS development company. Important benefits were the easy and effective guidance for all installation and analysis stages, the faster installation for the ERPS and the control and cost reduction for the installation, in terms of time, manpower, technological equipment and other resources.

  4. Online monitoring of Accessories for Underground Electrical Installations through Acoustics Emissions

    Directory of Open Access Journals (Sweden)

    Casals-Torrens P.

    2012-04-01

    Full Text Available The acoustic waves caused by Partial Discharges inside the dielectric materials, can be detected by acoustic emission (AE sensors and analyzed in the time domain. The experimental results presented, show the online detection capability of these sensors in the environment near a cable accessory, such as a splice or terminal. The AE sensors are immune to electromagnetic interference and constitute a detection method non-intrusive and non-destructive, which ensures a galvanic decoupling with respect to electric networks, this technique of partial discharge detection can be applied as a test method for preventive or predictive maintenance (condition-based maintenance to equipments or facilities of medium and high voltage in service and represents an alternative method to electrical detection systems, conventional or not, that continue to rely on the detection of current pulses. This paper presents characterization tests of the sensors AE through comparative tests of partial discharge on accessories for underground power cables.

  5. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    Science.gov (United States)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  6. 47 CFR 68.213 - Installation of other than “fully protected” non-system simple customer premises wiring.

    Science.gov (United States)

    2010-10-01

    ... TELEPHONE NETWORK Terminal Equipment Approval Procedures § 68.213 Installation of other than “fully... residential and business telephone service. More complex installations of wiring for multiple line services, for use with systems such as PBX and key telephone systems, are controlled by § 68.215 of these...

  7. New mud gas monitoring system aboard D/V Chikyu

    Science.gov (United States)

    Kubo, Yusuke; Inagaki, Fumio; Eguchi, Nobuhisa; Igarashi, Chiaki

    2013-04-01

    Mud gas logging has been commonly used in oil industry and continental scientific drilling to detect mainly hydrocarbon gases from the reservoir formation. Quick analysis of the gas provides almost real-time information which is critical to evaluate the formation and, in particular, safety of drilling operation. Furthermore, mud gas monitoring complements the lack of core or fluid samples particularly in a deep hole, and strengthen interpretations of geophysical logs. In scientific ocean drilling, on the other hand, mud gas monitoring was unavailable in riserless drilling through the history of DSDP and ODP, until riser drilling was first carried out in 2009 by D/V Chikyu. In IODP Exp 319, GFZ installed the same system with that used in continental drilling aboard Chikyu. High methane concentrations are clearly correlated with increased wood content in the cuttings. The system installation was, however, temporary and gas separator was moved during the expedition for a technical reason. In 2011, new mud gas monitoring system was installed aboard Chikyu and was used for the first time in Exp 337. The gas separator was placed on a newly branched bypass mud flow line, and the gas sample was sent to analysis unit equipped with methane carbon isotope analyzer in addition to mass spectrometer and gas chromatograph. The data from the analytical instruments is converted to depth profiles by calculating the lag effects due to mud circulation. Exp 337 was carried out from July 26 to Sep 30, 2011, at offshore Shimokita peninsula, northeast Japan, targeting deep sub-seafloor biosphere in and around coal bed. Data from the hole C0020A, which was drilled to 2466 mbsf with riser drilling, provided insights into bio-geochemical process through the depth of the hole. In this presentation, we show the design of Chikyu's new mud gas monitoring system, with preliminary data from Exp 337.

  8. Design and Installation of Irrigation System for the Expansion of Sugar cane- Industries in Ahvaz, IRAN.

    Science.gov (United States)

    Afshari, E.; Afshari, S.

    2005-12-01

    This paper presents achievements of a twelve years ongoing project expansion of sugar cane- industries as a major agricultural development in Ahvaz, IRAN. The entire project is divided in to seven units and each unit provides irrigation water for 30,000 acres of sugar cane farms in Ahwaz. Absou Inc. is one of the consulting firms that is in charge of design and overseeing installation of irrigation system as well as the development of lands for sugar-cane cultivation at one of the units, called Farabi unit .In general, the mission of project is to Pump fresh water from Karoon River and direct it to the sugar cane farm for irrigation. In particular, the task of design and installation include, (1) build a pumping station at Karoon River with capacity of 1271 ft3/sec, (2) transfer water by main channel from Karoon rive to the farm site 19 miles (3) install a secondary pumping stations which direct water from main channel to drainage pipes and provides water for local farms (4) build a secondary channels which carries water with pipe lines with total length of 42 miles and diameter of 16 to 32 inch. (5) install drainage pump stations and collectors (6) level the ground surface and prepare it for irrigation (7) build railroad for carrying sugar canes (23 miles). Thus far, more than 15,000 acres of farm in Farabi unit is under sugar cane cultivation. The presentation will illustrate more details about different aspects of the project including design, installation and construction phases.

  9. A Framework to Survey the Energy Efficiency of Installed Motor Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rao, Prakash; Hasanbeigi, Ali; McKane, Aimee

    2013-08-01

    While motors are ubiquitous throughout the globe, there is insufficient data to properly assess their level of energy efficiency across regional boundaries. Furthermore, many of the existing data sets focus on motor efficiency and neglect the connected drive and system. Without a comprehensive survey of the installed motor system base, a baseline energy efficiency of a country or region’s motor systems cannot be developed. The lack of data impedes government agencies, utilities, manufacturers, distributers, and energy managers when identifying where to invest resources to capture potential energy savings, creating programs aimed at reducing electrical energy consumption, or quantifying the impacts of such programs. This paper will outline a data collection framework for use when conducting a survey under a variety of execution models to characterize motor system energy efficiency within a country or region. The framework is intended to standardize the data collected ensuring consistency across independently conducted surveys. Consistency allows for the surveys to be leveraged against each other enabling comparisons to motor system energy efficiencies from other regions. In creating the framework, an analysis of various motor driven systems, including compressed air, pumping, and fan systems, was conducted and relevant parameters characterizing the efficiency of these systems were identified. A database using the framework will enable policymakers and industry to better assess the improvement potential of their installed motor system base particularly with respect to other regions, assisting in efforts to promote improvements to the energy efficiency of motor driven systems.

  10. Performance monitoring of different module technologies and design configurations of PV system in South Africa

    CSIR Research Space (South Africa)

    Roro, Kittessa T

    2016-06-01

    Full Text Available Performance monitoring of different module technologies and system configurations of Photovoltaic (PV) systems in South Africa is rare, resulting in-few reports based on field results of PV systems installed and operated in South Africa. The goal...

  11. The CMS Beam Halo Monitor Detector System

    CERN Document Server

    Stifter, Kelly

    2015-01-01

    A new Beam Halo Monitor (BHM) detector system has been installed in the CMS cavern to measure the machine-induced background (MIB) from the LHC. This background originates from interactions of the LHC beam halo with the final set of collimators before the CMS experiment and from beam gas interactions. The BHM detector uses the directional nature of Cherenkov radiation and event timing to select particles coming from the direction of the beam and to suppress those originating from the interaction point. It consists of 40 quartz rods, placed on each side of the CMS detector, coupled to UV sensitive PMTs. For each bunch crossing the PMT signal is digitized by a charge integrating ASIC and the arrival time of the signal is recorded. The data are processed in real time to yield a precise measurement of per-bunch-crossing background rate. This measurement is made available to CMS and the LHC, to provide real-time feedback on the beam quality and to improve the efficiency of data taking. Here, I present the detector...

  12. The CMS Beam Halo Monitor Detector System

    CERN Document Server

    Stifter, Kelly Marie

    2015-01-01

    A new Beam Halo Monitor (BHM) detector system has been installed in the CMS cavern to measure the machine-induced background (MIB) from the LHC. This background originates from interactions of the LHC beam halo with the final set of collimators before the CMS experiment and from beam gas interactions. The BHM detector uses the directional nature of Cherenkov radiation and event timing to select particles coming from the direction of the beam and to supress those originating from the interaction point. It consists of 40 quartz rods, placed on each side of the CMS detector, coupled to UV sensitive PMTs. For each bunch crossing the PMT signal is digitized by a charge integrating ASIC and the arrival time of the signal is recorded. The data are processed in real time to yield a precise measurement of per-bunch-crossing background rate. This measurement is made available to CMS and the LHC, to provide real-time feedback on the beam quality and to improve the efficiency of data taking. In this talk we will descri...

  13. The CMS Beam Halo Monitor Detector System

    CERN Document Server

    CMS Collaboration

    2015-01-01

    A new Beam Halo Monitor (BHM) detector system has been installed in the CMS cavern to measure the machine-induced background (MIB) from the LHC. This background originates from interactions of the LHC beam halo with the final set of collimators before the CMS experiment and from beam gas interactions. The BHM detector uses the directional nature of Cherenkov radiation and event timing to select particles coming from the direction of the beam and to suppress those originating from the interaction point. It consists of 40 quartz rods, placed on each side of the CMS detector, coupled to UV sensitive PMTs. For each bunch crossing the PMT signal is digitized by a charge integrating ASIC and the arrival time of the signal is recorded. The data are processed in real time to yield a precise measurement of per-bunch-crossing background rate. This measurement is made available to CMS and the LHC, to provide real-time feedback on the beam quality and to improve the efficiency of data taking. In this talk we will describ...

  14. Intrusion Detection System: Security Monitoring System

    Directory of Open Access Journals (Sweden)

    ShabnamNoorani,

    2015-10-01

    Full Text Available An intrusion detection system (IDS is an ad hoc security solution to protect flawed computer systems. It works like a burglar alarm that goes off if someone tampers with or manages to get past other security mechanisms such as authentication mechanisms and firewalls. An Intrusion Detection System (IDS is a device or a software application that monitors network or system activities for malicious activities or policy violations and produces reports to a management station.Intrusion Detection System (IDS has been used as a vital instrument in defending the network from this malicious or abnormal activity..In this paper we are comparing host based and network based IDS and various types of attacks possible on IDS.

  15. Productivity Enhancement through Production Monitoring System

    OpenAIRE

    Prasad, Shiva H C; Rao, Potti Srinivasa; Gopalkrishna, B; Ahluwalia, Aakash

    2017-01-01

    A production monitoring system uses the real-time data while production is online. The real-time production monitoring systems are designed as means of auto data to the collection and monitoring the data via display boards. This study focuses on analysing the real-time production monitoring systems through trend analysis in production and over consumption of raw material controlling the over consumptions in a pen manufacturing industry. The methodology followed is through process flow diagram...

  16. Practical Implementation of Embedded Controlled Boost Converter for Solar Installation System

    Directory of Open Access Journals (Sweden)

    A. Kalirasu

    2010-08-01

    Full Text Available The solar photovoltaic power has received great attention and experienced impressive progress in the countries all over the world in recent years because of more and more serious energy crisis and environmental pollution. This paper proposes a Embedded controlled boost converter for solar installation system. Boost converter system is simulated using Matlab and it is implemented using embedded controller. The simulation and experimental results of this system are presented and compared. This converter has advantages like improved power factor, fast response and reduced hardware.

  17. Solar heating and hot water system installed at Cherry Hill, New Jersey. [Hotels

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-16

    The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system went into operation November 8, 1978 and is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are General Electric Company liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.

  18. Predictive parameters of Legionella pneumophila occurrence in hospital water: HPCs and plumbing system installation age.

    Science.gov (United States)

    Ghanizadeh, Ghader; Mirmohamadlou, Ali; Esmaeli, Davoud

    2016-09-01

    Occurrence of Legionella pneumophila can be relevant to the installation age and the presence of heterotrophic plate counts (HPCs). This research illustrates L. pneumophila contamination of hospital water in accordance with the installation age and the presence of HPCs. One hundred and fifty samples were collected from hot and cold water systems and cultured on R2A and BCYE agar. L. pneumophila identification was done via specific biochemical tests. HPCs and L. pneumophila were detected in 96 and 37.3 % of the samples, respectively. The mean of HPCs density was 947 ± 998 CFU/ml; therefore, 52 % of the samples had higher densities than 500 CFU/ml. High densities of HPCs (>500 CFU/ml) led to colonization of L. pneumophila (≥1000 CFU/ml), mainly observed in cooling systems, gynecological, sonography, and NICU wards. Chi(2) test demonstrated that higher densities (>500 CFU/ml) of HPCs and L. pneumophila contamination in cold water were more frequent than warm water (OR: 2.3 and 1.49, respectively). Univariate regressions implied a significant difference between HPCs density and installation age in positive and negative tests of L. pneumophila (OR = 1.1, p pneumophila occurrences (p pneumophila and HPCs densities (r s  = 0.33, p pneumophila, HPCs, and installation age are relevant; so, plumbing system renovation with appropriate materials and promotion of the effective efforts for hospital's water quality assurance is highly recommended.

  19. Evolutionary Autonomous Health Monitoring System (EAHMS) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — For supporting NASA's Robotics, Tele-Robotics and Autonomous Systems Roadmap, we are proposing the "Evolutionary Autonomous Health Monitoring System" (EAHMS) for...

  20. Analytical methods and monitoring system for E-beam flue gas treatment process

    Science.gov (United States)

    Licki, J.; Chmielewski, A. G.; Iller, E.; Zakrzewska-Trznadel, G.; Tokunaga, O.; Hashimoto, S.

    1998-06-01

    The results of reliable and precise measurement of gas composition in different key points of e-beam installation are necessary for its proper operation and control. Only the composition of flue gas coming into installation is adequate to composition of flue gas emitted from coal-fired boiler. At other points of e-b installation the gas composition is strongly modified by process conditions therefore specific measuring system (sampling and conditioning system and set of gas analyzers) for its determination are required. In the paper system for gas composition measurement at inlet and outlet of e-b installation are described. Process parameters are continuously monitoring by CEM system and occasionally by the grab sample system. Both system have been tested at pilot plant at EPS Kawȩczyn.

  1. CAVITY BEAM POSITION MONITOR SYSTEM FOR ATF2

    CERN Document Server

    Boogert, S T; Cullinan, F; Joshi, N; Lyapin, A; Aryshev, A; Honda, Y; Naito, T; Terunuma, N; Urakara, J; Heo, A; Kim, E-S; Kim, Y I; McCormick, D; Frisch, J; Nelson, J; Smith, T; White, G R

    2011-01-01

    The Accelerator Test Facility 2 (ATF2) in KEK, Japan, is a prototype scaled demonstrator system for the final focus required for a future high energy lepton linear collider. The ATF2 beam-line is instrumented with a total of 41 high resolution C and S band resonant cavity beam position monitors (BPM) with associated mixer electronics and digitisers. In addition 4 high resolution BPMs have been recently installed at the interaction point, we briefly describe the first operational experience of these cavities in the ATF2 beam-line. The current status of the overall BPM system is also described, with a focus on operational techniques and performance.

  2. The Intelligent Door Monitoring System on Internet

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    The hardware structure and software function of intelligence doormonitoring control systems on Internet is expounded. The remote managing function, database function, and the realization of dialing users are introduced. The reset card is installed to improve reliability. The design of the system is reasonable and reliable. Results showed that 10 percent of the line investment have been cut off.

  3. Probe into Instrument System of SCR Denitration Installation%SCR脱硝装置仪表系统探讨

    Institute of Scientific and Technical Information of China (English)

    周必华; 赵发生

    2015-01-01

    The paper presents the simple lfow and instrument system of SCR denitration instal ation, expatiates the key instrument instalation and the attention matters of type selection in SCR denitration instalation. They provide the use for refer-ence and learning role for the type selection of SCR denitration instalation.%介绍了SCR脱硝装置的简单流程及仪表系统,阐述了SCR脱硝装置中重要的仪表设备及选型注意事项,对SCR脱硝装置仪表的选型有一定的借鉴和参考作用。

  4. Solar photovoltaic applications seminar: design, installation and operation of small, stand-alone photovoltaic power systems

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    This seminar material was developed primarily to provide solar photovoltaic (PV) applied engineering technology to the Federal community. An introduction to photoconductivity, semiconductors, and solar photovoltaic cells is included along with a demonstration of specific applications and application identification. The seminar details general systems design and incorporates most known information from industry, academia, and Government concerning small solar cell power system design engineering, presented in a practical and applied manner. Solar PV power system applications involve classical direct electrical energy conversion and electric power system analysis and synthesis. Presentations and examples involve a variety of disciplines including structural analysis, electric power and load analysis, reliability, sizing and optimization; and, installation, operation and maintenance. Four specific system designs are demonstrated: water pumping, domestic uses, navigational and aircraft aids, and telecommunications. All of the applications discussed are for small power requirement (under 2 kilowatts), stand-alone systems to be used in remote locations. Also presented are practical lessons gained from currently installed and operating systems, problems at sites and their resolution, a logical progression through each major phase of system acquisition, as well as thorough design reviews for each application.

  5. One-Year Monitoring PV Power Plant Installed on Rooftop of Mineirão Fifa World Cup/Olympics Football Stadium

    Directory of Open Access Journals (Sweden)

    Luís G. Monteiro

    2017-02-01

    Full Text Available This paper presents results of one-year monitoring of AC side electrical parameters and the characterization of local solar radiation at the biggest rooftop PV Power Plant, with an installed capacity of 1.42 MWp, mounted at Mineirão Football Stadium in Brazil. This stadium is one of the sport facilities that hosted 2014 FIFA World Cup and Rio 2016 Summer Olympics Games in the country. Results showed how it is important to study and characterize the solar resource in the region of interest, based on historic data, to provide the understanding of solar radiation and thus project PV power plants with better performance. Furthermore, AC electrical data show the behavior of active, reactive and apparent powers and the influence of the PV system on the power factor at the local grid utility connection point. Finally, PV power plant performance data (as annual final yield, performance ratio and capacity factor are also presented and compared with data from PVsyst software simulations. The results over the monitoring period were good considering the specificities of the stadium

  6. Standard-B Hydrogen Monitoring System, system design description

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, T.C.

    1995-01-16

    During most of the year, it is assumed that the vapor in the 177 radioactive waste tanks on the Hanford Project site contain a uniform mixture of gases. Several of these waste tanks (currently twenty five, 6 Double Shell Tanks and 19 Single Shell Tanks) were identified as having the potential for the buildup of gases to a flammable level. An active ventilation system in the Double Shell Tanks and a passive ventilation system in the Single Shell Tanks provides a method of expelling gases from the tanks. A gas release from a tank causes a temporary rise in the tank pressure, and a potential for increased concentration of hydrogen gas in the vapor space. The gas is released via the ventilation systems until a uniform gas mixture in the vapor space is once again achieved. This document describes the design of the Standard-B Hydrogen Monitoring System, (SHMS) and its components as it differs from the original SHMS. The differences are derived from changes made to improve the system performance but not implemented in all the installed enclosures.

  7. Power supply system for the COMPASS tokamak re-installed at the IPP, Prague

    Energy Technology Data Exchange (ETDEWEB)

    Zajac, Jaromir [Institute of Plasma Physics, v.v.i., Za Slovankou 3, 18200 Prague (Czech Republic)], E-mail: zajac@ipp.cas.cz; Panek, Radomir; Zacek, Frantisek; Vlcek, Jiri; Hron, Martin [Institute of Plasma Physics, v.v.i., Za Slovankou 3, 18200 Prague (Czech Republic); Krivska, Alena [Institute of Plasma Physics, v.v.i., Za Slovankou 3, 18200 Prague (Czech Republic); Czech Technical University of Prague, Telecommunication Engineering Department, Prague (Czech Republic); Hauptmann, Radim; Danek, Michal [CKD Elektrotechnika, a.s., Prague (Czech Republic); Simek, Josef [CKD Nove Energo, a.s., Prague (Czech Republic); Prosek, Jan [CKD Finergis, a.s., Brno (Czech Republic)

    2009-06-15

    The COMPASS-D tokamak, originally operated in UKAEA Culham, UK, is being reinstalled in the Institute of Plasma Physics (IPP), AS CR. COMPASS-D was designed as a flexible tokamak in the 1980s mainly to explore MHD physics. Its operation (with D-shaped vessel) began in UKAEA in 1992. In 2001 COMPASS-D had been mothballed and later offered to the Institute of Plasma Physics (IPP Prague) AS CR. The re-installation of the COMPASS-D tokamak in IPP Prague had started in 2006. Due to the low power available from the local grid, the two flywheel-generators (47 MVA, 45 MJ, 85 Hz, 6.3 kV) are installed as storage of the required energy. Four AC/DC thyristor rectifiers provide the desired current profiles in toroidal and poloidal coil systems. The start-up circuit, which provides a loop voltage necessary for the plasma generation, is based on fully solid-state switchers and two temporarily inserted resistors. This paper describes the design of the new power supply system and shows details of the commissioning procedures and installation. We also present some results of a comprehensive analysis of the circuit operation performed in Matlab Simulink.

  8. Planning and Computerised Monitoring of an Experiment of Thermal Analysis of the Alloys in the Al-Cu-Si System

    Directory of Open Access Journals (Sweden)

    Florentina Cziple

    2007-10-01

    Full Text Available The paper presents an installation conceived for the automatic registration of the temperature in the thermal analysis, at the industrial and laboratory level, with application to the system of non-ferrous alloys Al-Cu-Si. The experiment performed on the above installation is compared to processes monitored through simulation with specialised software.

  9. DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Martin E. Cobern

    2004-01-09

    The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program entails modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype. The project continues to advance, but is behind the revised (14-month) schedule. Tasks 1-3 (Modeling, Specification and Design) are all essentially complete. The test bench for the Test and Evaluation (Tasks 4 & 5) has been designed and constructed. The design of the full-scale laboratory prototype and associated test equipment is complete and the components are out for manufacture. Barring any unforeseen difficulties, laboratory testing should be complete by the end of March, as currently scheduled. We anticipate the expenses through March to be approximately equal to those budgeted for Phase I.

  10. The ingestible thermal monitoring system

    Science.gov (United States)

    Cutchis, Protagoras N.; Hogrefe, Arthur F.; Lesho, Jeffery C.

    1988-01-01

    A thermal monitoring system for measuring body core temperatures was developed that contains an ingestible pill which is both commandable and rechargeable, and which uses magnetic induction for command and telemetry as well as for recharging. The pill electronics consist of a battery power source, a crystal-controlled oscillator that drives a small air coil, and a command detection circuit. The resulting 262-kHz magnetilc field can be easily detected from a distance of 1 m. The pill oscillator functions at voltages less than 1 V, supplied by a single Ni-Cd battery, which must be recharged after 72 h of continuous transmission. The pill can be recalibrated periodically to compensate for long-term drift.

  11. Experimental hybrid system installed in Pachuca, Hidalgo, Mexico; Sistema hibrido experimental instalado en Pachuca, Hidalgo, Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Flores, J. Roberto; Gonzalez, Raul; Mejia, Fortino; Lagunas, Javier; Huacuz, Jorge [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    2000-07-01

    In this work, the main characteristics of one experimental hybrid system (solar and wind) installed by the Electrical Research Institute, in collaboration with the Autonomous University of the State of Hidalgo are presented. The hybrid system has an installed wind capacity of 2.5 kW and photovoltaic capacity of 1.8 kW. The nominal operation voltage of the system 12 Vcd. The technical characteristics of all components of the hybrid system and of the data acquisition system are described in this work. The objective of this hybrid system installation is to carry out experimental tests on different configurations schemes, electrical dispatching and energy generation. Finally, the activities to be carried out in the future and the importance of this project are presented. [Spanish] En este trabajo se presentan las principales caracteristicas del sistema hibrido experimental solar-eolico (con un motogenerador de gasolina, como sistema de respaldo), instalado por el Instituto de Investigaciones Electricas (IIE) en conjunto con la Universidad Autonoma del Estado de Hidalgo (UAEH), en las instalaciones de la preparatoria No.4 de esta universidad. En terminos generales este sistema hibrido tiene una capacidad instalada de 2.5 KW eolicos y 1.0 KW fotovoltaicos. El voltaje nominal de operacion del sistema es de 12 Vcd. Los detalles de la configuracion y caracteristicas del sistema y sus componentes se describen en este trabajo. Tambien se mencionan las caracteristicas y configuracion del sistema de adquisicion de datos. Se presentan las variables que son registradas en el sistema de adquisicion de datos y que son utilizadas para llevar a cabo la evaluacion del sistema. El sistema hibrido fue concebido como una estacion de pruebas experimental donde se podran probar diferentes configuraciones operativas y esquemas de despacho y generacion de energia. Por ultimo se hace mencion de los trabajos a desarrollar en el futuro haciendose notar la trascendencia de este proyecto en el

  12. Beam Position and Phase Monitor - Wire Mapping System

    Energy Technology Data Exchange (ETDEWEB)

    Watkins, Heath A [Los Alamos National Laboratory; Shurter, Robert B. [Los Alamos National Laboratory; Gilpatrick, John D. [Los Alamos National Laboratory; Kutac, Vincent G. [Los Alamos National Laboratory; Martinez, Derwin [Los Alamos National Laboratory

    2012-04-10

    The Los Alamos Neutron Science Center (LANSCE) deploys many cylindrical beam position and phase monitors (BPPM) throughout the linac to measure the beam central position, phase and bunched-beam current. Each monitor is calibrated and qualified prior to installation to insure it meets LANSCE requirements. The BPPM wire mapping system is used to map the BPPM electrode offset, sensitivity and higher order coefficients. This system uses a three-axis motion table to position the wire antenna structure within the cavity, simulating the beam excitation of a BPPM at a fundamental frequency of 201.25 MHz. RF signal strength is measured and recorded for the four electrodes as the antenna position is updated. An effort is underway to extend the systems service to the LANSCE facility by replacing obsolete electronic hardware and taking advantage of software enhancements. This paper describes the upgraded wire positioning system's new hardware and software capabilities including its revised antenna structure, motion control interface, RF measurement equipment and Labview software upgrades. The main purpose of the wire mapping system at LANSCE is to characterize the amplitude response versus beam central position of BPPMs before they are installed in the beam line. The wire mapping system is able to simulate a beam using a thin wire and measure the signal response as the wire position is varied within the BPPM aperture.

  13. Solar heating, cooling and domestic hot water system installed at Columbia Gas System Service Corporation, Columbus, Ohio

    Science.gov (United States)

    1980-01-01

    The solar energy system installed in the building has 2,978 sq ft of single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/hour water tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts from the site files, specification references, drawings, installation, operation and maintenance instructions are included.

  14. Results after one year from a Hydrostatic Levelling System installed at Diamond Light Source

    Science.gov (United States)

    Kay, James; Baker, Keith A.; Hoffman, William J.

    2010-06-01

    A Hydrostatic Levelling System (HLS) has been installed at Diamond Light Source. 8 sensors have been positioned along a 60 metre portion of the floor of the Storage Ring and the Experimental Hall, stretching out along a typical beamline route from Insertion Device to sample. 7 of the sensors are installed on the thick, reinforced concrete floor of the Experimental Hall which is supported on piles and the last sensor is mounted on the much thinner concrete floor of the peripheral walkway which has no piles. The foundations and floor were designed to achieve settlements measuring 1 micron per 10 metres per hour and 10 microns per 10 metres per day. A larger range was specified of 250 microns per 10 metres per year on the Experimental Hall floor and 100 microns per 10 metres per year in the Storage Ring to account for longer term settlement effects and seasonal variation and the HLS has been installed to try and measure these very small movements. Results after one year of operation are presented.

  15. HTS Transmission Cable System for installation in the Long Island Power Grid

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Frank [American Superconductor Corporation, Devens, MA (United States); Durand, Fabien [American Superconductor Corporation, Devens, MA (United States); Maguire, James [American Superconductor Corporation, Devens, MA (United States)

    2015-10-05

    Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2 and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.

  16. Solar heating and hot water system installed at Arlington Raquetball Club, Arlington, Virginia

    Science.gov (United States)

    1981-01-01

    A solar space and water heating system is described. The solar energy system consists of 2,520 sq. ft. of flat plate solar collectors and a 4,000 gallon solar storage tank. The transfer medium in the forced closed loop is a nontoxic antifreeze solution (50 percent water, 50 percent propylene glycol). The service hot water system consists of a preheat coil (60 ft. of 1 1/4 in copper tubing) located in the upper third of the solar storage tank and a recirculation loop between the preheat coil and the existing electric water heaters. The space heating system consists of two separate water to air heat exchangers located in the ducts of the existing space heating/cooling systems. The heating water is supplied from the solar storage tank. Extracts from site files, specification references for solar modifications to existing building heating and hot water systems, and installation, operation and maintenance instructions are included.

  17. Power Supply Reliability Assessment in UPFC-installed Transmission System for ATC Enhancement Considering Transient Stability

    Science.gov (United States)

    Masuta, Taisuke; Yokoyama, Akihiko

    With recent development of power electronics technology, power system stability enhancement and optimal power flow control by using Flexible AC Transmission System (FACTS) devices have so far been studied. The FACTS devices to relieve multiple constraints can also make it possible to enhance Available Transfer Capability (ATC) without construction of new transmission lines. The previous research revealed that ATC is expanded by avoiding multiple constraints in OPF using Unified Power Flow Controller (UPFC). For long-term operation of such ATC-expanded power system, it is necessary to evaluate power system reliability. In this paper, the evaluation method of supply reliability for UPFC-installed power system is proposed. Both thermal capacity and transient stability constraints are considered. The effectiveness of the proposed method is shown by numerical examples for IEEJ East10-machine test system.

  18. Solar hot water system installed at Days Inn Motel, Dallas, Texas (Valley View)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    The solar hot water system installed in the Days Inns of America, Inc., Days Inn Motel (120 rooms), I-35/2276 Valley View Lane, Dallas, Texas is described. The solar system was designed by ILI Incorporated to provide 65 percent of the total domestic hot water (DHW) demand. The Solar Energy Products, model CU-30WW liquid (water) flat plate collector (1000 square feet) system automatically drains into the 1000 gallon steel storage tank when the solar pump is not running. This system is one of eleven systems planned. Heat is transferred from the DHW tanks through a shell and tube heat exchanger. A circulating pump between the DHW tanks and heat exchanger enables solar heated water to help make up standby losses. All pumps are controlled by differential temperature controllers. The operation of this system was begun March 11, 1980. The solar components were partly funded ($15,000 of 30,000 cost) by a Department of Energy grant.

  19. Vehicle Dynamics Monitoring and Tracking System (VDMTS): Monitoring Mission Impacts in Support of Installation Land Management

    Science.gov (United States)

    2012-06-01

    performed using multiple vehicles at Fort Ri- ley , PTA, and Eglin AFB. The theoretical model results were compared with measured impact values. Additionally...Sample Conversions: $BB209 = -178.75°/s $ESOF2 = 0.806 g $H80BC = 0.094 gauss $J800D = 26.82 OC $S87FE = 4.95 1 V $IBF30 = -0.1 gauss l0004D295

  20. Seismic detection system for blocking the dangerous installations in case of strong earthquake occurrence

    Science.gov (United States)

    Ghica, Daniela; Corneliu Rau, Dan; Ionescu, Constantin; Grigore, Adrian

    2010-05-01

    During the last 70 years, four major earthquakes occurred in the Vrancea seismic area affected Romania territory: 10 November 1940 (Mw = 7.7, 160 km depth), 4 March 1977 (Mw = 7.5, 100 km depth), 30 August 1986 (Mw = 7.2, 140 km depth), 30 May 30 1990 (Mw = 6.9, 80 km depth). Romania is a European country with significant seismicity. So far, the 1977 event had the most catastrophic consequences: about 33,000 residences were totally destroyed or partially deteriorated, 1,571 people dies and another 11,300 were injured. Moreover, 61 natural-gas pipelines were damaged, causing destructive fires. The total losses were estimated at 3 mld. U.S. dollars. Recent studies clearly pointed out that in case of a strong earthquake occurrence in Vrancea region (Ms above 7), the biggest danger regarding the major cities comes from explosions and fires started immediately after the earthquake, and the most important factor of risk are the natural gas distribution networks. The damages are strongly amplified by the fact that, simultaneously, water and electric energy lines distributions are damaged too, making impossible the efficient firemen intervention, for localizing the fire sources. Presently, in Romania safe and efficient accepted solutions for improving the buildings securing, using antiseismic protection of the dangerous installations as natural-gas pipelines are not available. Therefore, we propose a seismic detection system based on a seismically actuated gas shut-off valve, which is automatically shut down in case of a seismic shock. The device is intended to be installed in the natural-gas supply line outside of buildings, as well at each user (group of users), inside of the buildings. The seismic detection system for blocking the dangerous installations in case of a strong earthquake occurrence was designed on the basis of 12 criteria enforced by the US regulations for seismic valves, aimed to eliminate the critical situations as fluids and under pressure gases leakage

  1. The installation and performance test of the surveillance system for DUPIC facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dong Young; Kim, Ho Dong; Cha, Hong Ryul

    2000-07-01

    We have developed the real time surveillance system, named by DSSS, for DUPIC test facility. The system acquires data from He-3 neutron monitors(DSNM) and CCD cameras to automatically diagnose the transportation status of nuclear material. This technical report shortly illustrates important features of hardware and software of the system.

  2. Monitoring of the electrical parameters in off-grid solar power system

    Science.gov (United States)

    Idzkowski, Adam; Leoniuk, Katarzyna; Walendziuk, Wojciech

    2016-09-01

    The aim of this work was to make a monitoring dedicated to an off-grid installation. A laboratory set, which was built for that purpose, was equipped with a PV panel, a battery, a charge controller and a load. Additionally, to monitor electrical parameters from this installation there were used: LabJack module (data acquisition card), measuring module (self-built) and a computer with a program, which allows to measure and present the off-grid installation parameters. The program was made in G language using LabVIEW software. The designed system enables analyzing the currents and voltages of PV panel, battery and load. It makes also possible to visualize them on charts and to make reports from registered data. The monitoring system was also verified by a laboratory test and in real conditions. The results of this verification are also presented.

  3. Health and usage monitoring system for the small aircraft composite structure

    Science.gov (United States)

    Růžička, Milan; Dvořák, Milan; Schmidová, Nikola; Šašek, Ladislav; Štěpánek, Martin

    2017-07-01

    This paper is focused on the design of the health and usage monitoring system (HUMS) of the composite ultra-light aircrafts. A multichannel measuring system was developed and installed for recording of the long-term operational measurements of the UL airplane. Many fiber Bragg grating sensors were implemented into the composite aircraft structure, mainly in the glue joints. More than ten other analog functions and signals of the aircraft is monitored and can be correlated together. Changing of the FBG sensors responses in monitored places and their correlations, comparing with the calibration and recalibration procedures during a monitored life may indicate damage (eg. in bonded joints) and complements the HUMS system.

  4. DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Martin E. Cobern

    2005-01-28

    The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. The redesign and upgrade of the laboratory prototype was completed on schedule and it was assembled during the last period. Testing was begin during the first week of October. Initial results indicated that the dynamic range of the damping was less than predicted and that the maximum damping was also less than required. A number of possible explanations for these results were posited, and test equipment was acquired to evaluate the various hypotheses. Testing was just underway at the end of this period.

  5. DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Martin E. Cobern

    2004-10-29

    The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. Phase II began on June 1, and the first month's effort were reported in the seventh quarterly report on the project.1 The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. The redesign and upgrade of the laboratory prototype was completed on schedule during this period, and assembly was complete at the end of this period. Testing will begin during the first week of October. This aspect of the project is thus approximately six weeks behind schedule. Design of the field prototype is progressing per schedule.

  6. An optically remote powered subsea video monitoring system

    Science.gov (United States)

    Lau, Fat Kit; Stewart, Brian; McStay, Danny

    2012-06-01

    The drive for Ocean pollution prevention requires a significant increase in the extent and type of monitoring of subsea hydrocarbon production equipment. Sensors, instrumentation, control electronics, data logging and transmission units comprising such monitoring systems will all require to be powered. Conventionally electrical powering is supplied by standard subsea electrical cabling. The ability to visualise the assets being monitored and any changes or faults in the equipment is advantageous to an overall monitoring system. However the effective use of video cameras, particularly if the transmission of real time high resolution video is desired, requires a high data rate and low loss communication capability. This can be challenging for heavy and costly electrical cables over extended distances. For this reason optical fibre is often adopted as the communication channel. Using optical fibre cables for both communications and power delivery can also reduce the cost of cabling. In this paper we report a prototype optically remote powered subsea video monitoring system that provides an alternative approach to powering subsea video cameras. The source power is transmitted to the subsea module through optical fibre with an optical-to-electrical converter located in the module. To facilitate intelligent power management in the subsea module, a supercapacitor based intermediate energy storage is installed. Feasibility of the system will be demonstrated. This will include energy charging and camera operation times.

  7. Technical monitoring of 80 photovoltaic systems in Apeldoorn, Netherlands; Technische monitoring van 80 PV-systemen te Apeldoorn

    Energy Technology Data Exchange (ETDEWEB)

    Van der Borg, N.J.C.M.; Jansen, M.J. [ECN Zon, Petten (Netherlands)

    2001-02-01

    The title monitoring programme concerns 94 photovoltaic (PV) systems which are installed on houses in the urban area 'Het Woudhuis' in Apeldoorn, Netherlands. The houses are subdivided into four groups which differ in the design of the PV-systems or orientation of the roofs. In this report the results of the technical monitoring of 80 PV-systems of the groups 2, 3 and 4 are presented. The results of group 1 are published in a previous report 5 refs.

  8. Argonne National Laboratory`s photo-oxidation organic mixed waste treatment system - installation and startup testing

    Energy Technology Data Exchange (ETDEWEB)

    Shearer, T.L.; Nelson, R.A.; Torres, T.; Conner, C.; Wygmans, D.

    1997-09-01

    This paper describes the installation and startup testing of the Argonne National Laboratory (ANL-E) Photo-Oxidation Organic Mixed Waste Treatment System. This system will treat organic mixed (i.e., radioactive and hazardous) waste by oxidizing the organics to carbon dioxide and inorganic salts in an aqueous media. The residue will be treated in the existing radwaste evaporators. The system is installed in the Waste Management Facility at the ANL-E site in Argonne, Illinois. 1 fig.

  9. Monitoring Technology of Installation of Offshore Platform Steel Catenary Riser%海洋平台钢悬链线立管安装监测技术研究

    Institute of Scientific and Technical Information of China (English)

    李丽玮; 何宁; 王辉

    2011-01-01

    On the basis of complex natural environment,this paper researchs vessel motion,heave compensation of ship location and riser shape while laying and lifting. With the main ponit-ROV sonar monitoring system, study around touch down point of pipeline, steel catenary riser shapes and seabed topography were made. And then these paraments to guide analysis of riser installation process was used. Finally complete monitoring technologies for steel catenary riser installation was formed,to provide technical support for the development of offshore oil and innovation of monitoring technology for riser installation in China.%为在深海复杂工况下把平台立管安装到位,需对安装过程进行监测.综合考虑船舶位移、升沉补偿、立管吊装变形,以声纳和远程操作潜水器(ROV)监测系统为技术支撑,监测管线着陆区位置、悬链线形态、以及海底地形等参数,指导立管的安装过程.形成一套完善的钢悬链线立管安装监测技术,促进我国深海石油的发展.

  10. Solar hot water system installed at Quality Inn, Key West, Florida. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    The solar energy hot water system installed in the Quality Inn, Key West, Florida, which consists of four buildings, is described. Three buildings are low-rise, two-story buildings containing 100 rooms. The fourth is a four-story building with 48 rooms. The solar system was designed to provide approximately 50% of the energy required for the domestic hot water system. The solar system consists of approximately 1400 ft/sup 2/ of flat plate collector, two 500 gal storage tanks, a circulating pump, and a controller. Operation of the system was begun in April 1978, and has continued to date with only three minor interruptions for pump repair. In the first year of operation, it was determined that the use of the solar facility resulted in 40% fuel savings.

  11. Installation guidelines for Solar Heating System, single-family residence at New Castle, Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The Solar Heating System installer guidelines are provided for each subsystem and includes testing and filling the system. This single-family residential heating system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Information is also provided on the operating procedures, controls, caution requirements, and routine and schedule maintenance. Information consists of written procedures, schematics, detail drawings, pictures and manufacturer's component data.

  12. Seismic ACROSS Transmitter Installed at Morimachi above the Subducting Philippine Sea Plate for the Test Monitoring of the Seismogenic Zone of Tokai Earthquake not yet to Occur

    Science.gov (United States)

    Kunitomo, T.; Kumazawa, M.; Masuda, T.; Morita, N.; Torii, T.; Ishikawa, Y.; Yoshikawa, S.; Katsumata, A.; Yoshida, Y.

    2008-12-01

    Here we report the first seismic monitoring system in active and constant operation for the wave propagation characteristics in tectonic region just above the subducting plate driving the coming catastrophic earthquakes. Developmental works of such a system (ACROSS; acronym for Accurately Controlled, Routinely Operated, Signal System) have been started in 1994 at Nagoya University and since 1996 also at TGC (Tono Geoscience Center) of JAEA promoted by Hyogoken Nanbu Earthquakes (1995 Jan.17, Mj=7.3). The ACROSS is a technology system including theory of signal and data processing based on the brand new concept of measurement methodology of Green function between a signal source and observation site. The works done for first generation system are reported at IWAM04 and in JAEA report (Kumazawa et al.,2007). The Meteorological Research Institute of JMA has started a project of test monitoring of Tokai area in 2004 in corporation with Shizuoka University to realize the practical use of the seismic ACROSS for earthquake prediction researches. The first target was set to Tokai Earthquake not yet to take place. The seismic ACROSS transmitter was designed so as to be appropriate for the sensitive monitoring of the deep active fault zone on the basis of the previous technology elements accumulated so far. The ground coupler (antenna) is a large steel-reinforced concrete block (over 20m3) installed in the basement rocks in order to preserve the stability. Eccentric moment of the rotary transmitter is 82 kgm at maximum, 10 times larger than that of the first generation. Carrier frequency of FM signal for practical use can be from 3.5 to 15 Hz, and the signal phase is accurately controlled by a motor with vector inverter synchronized with GPS clock with a precision of 10-4 radian or better. By referring to the existing structure model in this area (Iidaka et al., 2003), the site of the transmitting station was chosen at Morimachi so as to be appropriate for detecting the

  13. Monitored Geologic Repository Operations Monitoring and Control System Description Document

    Energy Technology Data Exchange (ETDEWEB)

    E.F. Loros

    2000-06-29

    The Monitored Geologic Repository Operations Monitoring and Control System provides supervisory control, monitoring, and selected remote control of primary and secondary repository operations. Primary repository operations consist of both surface and subsurface activities relating to high-level waste receipt, preparation, and emplacement. Secondary repository operations consist of support operations for waste handling and treatment, utilities, subsurface construction, and other selected ancillary activities. Remote control of the subsurface emplacement operations, as well as, repository performance confirmation operations are the direct responsibility of the system. In addition, the system monitors parameters such as radiological data, air quality data, fire detection status, meteorological conditions, unauthorized access, and abnormal operating conditions, to ensure a safe workplace for personnel. Parameters are displayed in a real-time manner to human operators regarding surface and subsurface conditions. The system performs supervisory monitoring and control for both important to safety and non-safety systems. The system provides repository operational information, alarm capability, and human operator response messages during emergency response situations. The system also includes logic control to place equipment, systems, and utilities in a safe operational mode or complete shutdown during emergency response situations. The system initiates alarms and provides operational data to enable appropriate actions at the local level in support of emergency response, radiological protection response, evacuation, and underground rescue. The system provides data communications, data processing, managerial reports, data storage, and data analysis. This system's primary surface and subsurface operator consoles, for both supervisory and remote control activities, will be located in a Central Control Center (CCC) inside one of the surface facility buildings. The system

  14. Computer Jet-Engine-Monitoring System

    Science.gov (United States)

    Disbrow, James D.; Duke, Eugene L.; Ray, Ronald J.

    1992-01-01

    "Intelligent Computer Assistant for Engine Monitoring" (ICAEM), computer-based monitoring system intended to distill and display data on conditions of operation of two turbofan engines of F-18, is in preliminary state of development. System reduces burden on propulsion engineer by providing single display of summary information on statuses of engines and alerting engineer to anomalous conditions. Effective use of prior engine-monitoring system requires continuous attention to multiple displays.

  15. Computer Jet-Engine-Monitoring System

    Science.gov (United States)

    Disbrow, James D.; Duke, Eugene L.; Ray, Ronald J.

    1992-01-01

    "Intelligent Computer Assistant for Engine Monitoring" (ICAEM), computer-based monitoring system intended to distill and display data on conditions of operation of two turbofan engines of F-18, is in preliminary state of development. System reduces burden on propulsion engineer by providing single display of summary information on statuses of engines and alerting engineer to anomalous conditions. Effective use of prior engine-monitoring system requires continuous attention to multiple displays.

  16. Installation guidelines for solar heating system, single-family residence at New Castle, Pennsylvania

    Science.gov (United States)

    1980-01-01

    The solar heating system installer guidelines are presented for each subsystem. This single family residential heating system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: (1) liquid cooled flat plate collectors; (2) water storage tank; (3) passive solar-fired domestic water preheater; (4) electric hot water heater; (5) heat pump with electric backup; (6) solar hot water coil unit; (7) tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; (8) control system; and (9) air-cooled heat purge unit. Information is provided on the operating procedures, controls, caution requirements, and routine and schedule maintenance in the form of written descriptions, schematics, detail drawings, pictures, and manufacturer's component data.

  17. Solar heating and hot water system installed at Municipal Building complex, Abbeville, South Carolina

    Science.gov (United States)

    1979-01-01

    Information on the solar energy system installed at the new municipal building for the City of Abbeville, SC is presented, including a description of solar energy system and buildings, lessons learned, and recommendations. The solar space heating system is a direct air heating system. The flat roof collector panel was sized to provide 75% of the heating requirement based on an average day in January. The collectors used are job-built with two layers of filon corrugated fiberglass FRP panels cross lapped make up the cover. The storage consists of a pit filled with washed 3/4 in - 1 1/2 in diameter crushed granite stone. The air handler includes the air handling mechanism, motorized dampers, air circulating blower, sensors, control relays and mode control unit. Solar heating of water is provided only those times when the hot air in the collector is exhausted to the outside.

  18. Design of Hanford Site 4th Generation Multi Function Corrosion Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    NORMAN, E.C.

    2000-08-30

    This document describes the design of the fourth-generation corrosion monitoring system scheduled to be installed in DST 241-AN-104 early in fiscal year 2001. A fourth-generation multi-function corrosion monitoring system has been designed for installation into a DST in the 241-AN farm at the Hanford Site in FY 2001. Improvements and upgrades from the third-generation system (installed in 241-AN-105) that have been incorporated into the fourth-generation system include: Addition of a built-in water lance to assist installation of probe into tanks with a hard crust layer at the surface of the waste; and Improvement of the electrode mounting apparatus used to attach the corrosion monitoring electrodes to the stainless steel probe body (new design simplifies probe assembly/wiring). These new features improve on the third-generation design and yield a system that is easier to fabricate and install, provides for a better understanding of the relationship between corrosion and other tank operating parameters, and optimizes the use of the riser that houses the probe in the tank.

  19. Digital Solution to Mining Image Monitor System

    Institute of Scientific and Technical Information of China (English)

    刘越男; 孙继平; 苏辉; 那景芳

    2001-01-01

    The thesis describes an advanced digital solution to mining digital image monitor system, which makes up the shortage of the traditional mining analog image monitor. It illustrates the system components and how to choose the encoder bandwidth of the system. The problem of image multicast and its solution in LAN are also discussed.

  20. Software For Monitoring VAX Computer Systems

    Science.gov (United States)

    Farkas, Les; Don, Ken; Lavery, David; Baron, Amy

    1994-01-01

    VAX Continuous Monitoring System (VAXCMS) computer program developed at NASA Headquarters to aid system managers in monitoring performances of VAX computer systems through generation of graphic images summarizing trends in performance metrics over time. VAXCMS written in DCL and VAX FORTRAN for use with DEC VAX-series computers running VMS 5.1 or later.

  1. Installation of a bio-venting remediation system using directionally drilled horizontal wells

    Energy Technology Data Exchange (ETDEWEB)

    Hardy, L. [Morrow Environmental Consultants Inc., Burnaby, BC (Canada); Stolz, A.P. [Petro-Canada, Inc. (Canada)

    1997-12-31

    The installation of a remediation system for off-site contamination was discussed. The site was contaminated with gasoline and diesel from an abandoned bulk fuel storage and distribution terminal located near a highway. The dissolved phase hydrocarbon plume extended beneath several houses down gradient of the site. Bioventing was considered to be the only remediation option to recover the liquid phase hydrocarbons beneath the highway in a way that would satisfy all the clean-up objectives and the design constraints. Bioventing is closely related to soil vapour extraction (SVE). The main difference is that in bioventing, the mechanism for removal of contaminants is bio-degradation by indigenous bacteria, whereas in SVE, contaminants are simply removed by volatilization. Bioventing systems enhance the activity of the indigenous bacteria by inducing air flow in the subsurface through the use of vapour injection or extraction wells. Two horizontal vapour extraction wells were installed with a directional drill. A soil pile was utilized as a bio-filter for the extracted hydrocarbon vapours and a backfilled trench was used to inject vapours recovered from the soil pile to the subsurface. The total mass of hydrocarbons degraded by this system in 230 days was estimated to be 1,000 kg. It was concluded that under appropriate conditions the in-situ treatment of contaminated soil using directionally drilled wells can be justified on both economic and technical grounds. 3 refs., 1 tab., 5 figs.

  2. Structural health monitoring system of soccer arena based on optical sensors

    Science.gov (United States)

    Shishkin, Victor V.; Churin, Alexey E.; Kharenko, Denis S.; Zheleznova, Maria A.; Shelemba, Ivan S.

    2014-05-01

    A structural health monitoring system based on optical sensors has been developed and installed on the indoor soccer arena "Zarya" in Novosibirsk. The system integrates 119 fiber optic sensors: 85 strain, 32 temperature and 2 displacement sensors. In addition, total station is used for measuring displacement in 45 control points. All of the constituents of the supporting structure are subjects for monitoring: long-span frames with under floor ties, connections, purlins and foundation.

  3. DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Martin E. Cobern

    2005-04-27

    The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. As a result of the lower than expected performance of the MR damper noted last quarter, several additional tests were conducted. These dealt with possible causes of the lack of dynamic range observed in the testing: additional damping from the oil in the Belleville springs; changes in properties of the MR fluid; and, residual magnetization of the valve components. Of these, only the last was found to be significant. By using a laboratory demagnetization apparatus between runs, a dynamic range of 10:1 was achieved for the damper, more than adequate to produce the needed improvements in drilling. Additional modeling was also performed to identify a method of increasing the magnetic field in the damper. As a result of the above, several changes were made in the design. Additional circuitry was added to demagnetize the valve as the field is lowered. The valve was located to above the Belleville springs to reduce the load placed upon it and offer a greater range of materials for its construction. In addition, to further increase the field strength, the coils were relocated from the mandrel to the outer housing. At the end of the quarter, the redesign was complete and new parts were on order. The project is approximately three months behind schedule at this time.

  4. Design and Development of Patient Monitoring System

    Science.gov (United States)

    Hazwanie Azizulkarim, Azra; Jamil, Muhammad Mahadi Abdul; Ambar, Radzi

    2017-08-01

    Patient monitoring system allows continuous monitoring of patient vital signs, support decision making among medical personnel and help enhance patient care. This system can consist of devices that measure, display and record human’s vital signs, including body temperature, heart rate, blood pressure and other health-related criteria. This paper proposes a system to monitor the patient’s conditions by monitoring the body temperature and pulse rate. The system consists of a pulse rate monitoring software and a wearable device that can measure a subject’s temperature and pulse rate only by using a fingertip. The device is able to record the measurement data and interface to PC via Arduino microcontroller. The recorded data can be viewed as a historical file or can be archived for further analysis. This work also describes the preliminary experimental results of the selected sensors to show the usefulness of the sensors for the proposed patient monitoring system.

  5. Monitoring by holographic radar systems

    Science.gov (United States)

    Catapano, Ilaria; Crocco, Lorenzo; Affinito, Antonio; Gennarelli, Gianluca; Soldovieri, Francesco

    2013-04-01

    Nowadays, radar technology represents a significant opportunity to collect useful information for the monitoring and conservation of critical infrastructures. Radar systems exploit the non-invasive interaction between the matter and the electromagnetic waves at microwave frequencies. Such an interaction allows obtaining images of the region under test from which one can infer the presence of potential anomalies such as deformations, cracks, water infiltrations, etc. This information turns out to be of primary importance in practical scenarios where the probed structure is in a poor state of preservation and renovation works must be planned. In this framework, the aim of this contribution is to describe the potentialities of the holographic radar Rascan 4/4000, a holographic radar developed by Remote Sensing Laboratory of Bauman Moscow State Technical University, as a non-destructive diagnostic tool capable to provide, in real-time, high resolution subsurface images of the sounded structure [1]. This radar provides holograms of hidden anomalies from the amplitude of the interference signal arising between the backscattered signal and a reference signal. The performance of the holographic radar is appraised by means of several experiments. Preliminary tests concerning the imaging below the floor and inside wood structures are carried out in controlled conditions at the Electromagnetic Diagnostic Laboratory of IREA-CNR. After, with reference to bridge monitoring for security aim, the results of a measurement campaign performed on the Musmeci bridge are presented [2]. Acknowledgments This research has been performed in the framework of the "Active and Passive Microwaves for Security and Subsurface imaging (AMISS)" EU 7th Framework Marie Curie Actions IRSES project (PIRSES-GA-2010-269157). REFERENCES [1] S. Ivashov, V. Razevig, I. Vasilyev, A. Zhuravlev, T. Bechtel, L. Capineri, The holographic principle in subsurface radar technology, International Symposium to

  6. Tracking the Sun IX: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Technologies Area; Darghouth, Naïm [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Technologies Area; Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Cates, Sarah [Exeter Associates, Columbia, MD (United States); DiSanti, Nicholas [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States)

    2016-08-16

    Now in its ninth edition, Lawrence Berkeley National Laboratory (LBNL)’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected solar photovoltaic (PV) systems in the United States. The present report focuses on residential and non-residential systems installed through year-end 2015, with preliminary trends for the first half of 2016. An accompanying LBNL report, Utility-Scale Solar, addresses trends in the utility-scale sector. This year’s report incorporates a number of important changes and enhancements from prior editions. Among those changes, LBNL has made available a public data file containing all non-confidential project-level data underlying the analysis in this report. Installed pricing trends presented within this report derive primarily from project-level data reported to state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. Refer to the text box to the right for several key notes about these data. In total, data were collected and cleaned for more than 820,000 individual PV systems, representing 85% of U.S. residential and non-residential PV systems installed cumulatively through 2015 and 82% of systems installed in 2015. The analysis in this report is based on a subset of this sample, consisting of roughly 450,000 systems with available installed price data.

  7. Performance monitoring of a multi-unit solar domestic hot water system

    Energy Technology Data Exchange (ETDEWEB)

    Makuch, P.D.; Harrison, S.J. [Queen`s Univ., Kingston, ON (Canada). Solar Calorimetry Lab.

    1994-12-01

    A solar domestic hot water (SDHW) system was installed on an existing multi-family apartment building in 1991. Energy monitoring hardware was installed in 1992. It was a preheat system that was retrofitted upstream of existing hot water tanks located in the building. Monitoring of the system continued for eight months. As a result of this monitoring, average daily values could be made available for each month, as well as values of incident solar radiation, outdoor temperature, hot water use, total system energy, auxiliary energy, solar energy delivered to the load, energy loss from the recirculation loop and pump run time. Performance results indicated that the system performed at a level close to simulated values, but that system performance during the summer period was severely reduced due to low hot water usage. 5 refs., 12 figs., 2 tabs.

  8. Optical analysis of a photovoltaic V-trough system installed in western India.

    Science.gov (United States)

    Maiti, Subarna; Sarmah, Nabin; Bapat, Pratap; Mallick, Tapas K

    2012-12-20

    The low concentrating photovoltaic (PV) system such as a 2× V-trough system can be a promising choice for enhancing the power output from conventional PV panels with the inclusion of thermal management. This system is more attractive when the reflectors are retrofitted to the stationary PV panels installed in a high aspect ratio in the north-south direction and are tracked 12 times a year manually according to preset angles, thus eliminating the need of diurnal expensive tracking. In the present analysis, a V-trough system facing exactly the south direction is considered, where the tilt angle of the PV panels' row is kept constant at 18.34°. The system is installed on the terrace of CSIR-Central Salt and Marine Chemicals Research Institute in Bhavnagar, Gujarat, India (21.47 N, 71.15 E). The dimension of the entire PV system is 9.64 m×0.55 m. The V-troughs made of anodized aluminum reflectors (70% specular reflectivity) had the same dimensions. An in-house developed; experimentally validated Monte Carlo ray-trace model was used to study the effect of the angular variation of the reflectors throughout a year for the present assembly. Results of the ray trace for the optimized angles showed the maximum simulated optical efficiency to be 85.9%. The spatial distribution of solar intensity over the 0.55 m dimension of the PV panel due to the V-trough reflectors was also studied for the optimized days in periods that included solstices and equinoxes. The measured solar intensity profiles with and without the V-trough system were used to calculate the actual optical efficiencies for several sunny days in the year, and results were validated with the simulated efficiencies within an average error limit of 10%.

  9. Intelligent monitoring system for intensive care units.

    Science.gov (United States)

    Nouira, Kaouther; Trabelsi, Abdelwahed

    2012-08-01

    We address in the present paper a medical monitoring system designed as a multi-agent based approach. Our system includes mainly numerous agents that act as correlated multi-agent sub-systems at the three layers of the whole monitoring infrastructure, to avoid non informative alarms and send effective alarms at time. The intelligence in the proposed monitoring system is provided by the use of time series technology. In fact, the capability of continuous learning of time series from the physiological variables allows the design of a system that monitors patients in real-time. Such system is a contrast to the classical threshold-based monitoring system actually present in the Intensive Care Units (ICUs) which causes a huge number of irrelevant alarms.

  10. Integrated Monitoring System of Production Processes

    Directory of Open Access Journals (Sweden)

    Oborski Przemysław

    2016-12-01

    Full Text Available Integrated monitoring system for discrete manufacturing processes is presented in the paper. The multilayer hardware and software reference model was developed. Original research are an answer for industry needs of the integration of information flow in production process. Reference model corresponds with proposed data model based on multilayer data tree allowing to describe orders, products, processes and save monitoring data. Elaborated models were implemented in the integrated monitoring system demonstrator developed in the project. It was built on the base of multiagent technology to assure high flexibility and openness on applying intelligent algorithms for data processing. Currently on the base of achieved experience an application integrated monitoring system for real production system is developed. In the article the main problems of monitoring integration are presented, including specificity of discrete production, data processing and future application of Cyber-Physical-Systems. Development of manufacturing systems is based more and more on taking an advantage of applying intelligent solutions into machine and production process control and monitoring. Connection of technical systems, machine tools and manufacturing processes monitoring with advanced information processing seems to be one of the most important areas of near future development. It will play important role in efficient operation and competitiveness of the whole production system. It is also important area of applying in the future Cyber-Physical-Systems that can radically improve functionally of monitoring systems and reduce the cost of its implementation.

  11. Solar heating and hot water system installed at Saint Louis, Missouri

    Science.gov (United States)

    1980-01-01

    The solar heating and hot water system installed at the William Tao & Associates, Inc., office building in St. Louis, Missouri is described, including maintenance and construction problems, final drawings, system requirements, and manufacturer's component data. The solar system was designed to provide 50 percent of the hot water requirements and 45 percent of the space heating needs for a 900 sq ft office space and drafting room. The solar facility has 252 sq ft of glass tube concentrator collectors and a 1000 gallon steel storage tank buried below a concrete slab floor. Freeze protection is provided by a propylene glycol/water mixture in the collector loop. The collectors are roof mounted on a variable tilt array which is adjusted seasonally and is connected to the solar thermal storage tank by a tube-in-shell heat exchanger. Incoming city water is preheated through the solar energy thermal storage tank.

  12. Overview of the Development and Installation of KEPCO Enhanced Power System Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Y.B.; Jang, G.S.; Cha, S.T. [Korea Electric Power Research Institute, Taejon (Korea)

    1999-07-01

    This paper describes design, development and implementation details of a large scale power system simulator being installed at the Kore Electric Power Research Institute. The so-called KEPCO Enhanced Power System Simulator (KEPS) will include both off line (i.e. non-real time) and on line (real time) simulation capabilities and will be used by KEPRI to study various aspects of the growing power network in Korea. A Real Time Digital simulator based on the well known RTDS hardware and software architecture will form the core of the KEPS system. A number of developments and enhancements will made to the fundamental simulation technology in order to meet some of the special requirements defined in the KEPS project. (author). 5 refs., 4 figs.

  13. Solar heating and hot water system installed at St. Louis, Missouri. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    Information is provided on the solar heating and hot water system installed at the William Tao and Associates, Inc., office building in St. Louis, Missouri. The information consists of description, photos, maintenance and construction problems, final drawing, system requirements and manufacturer's component data. The solar system was designed to provide 50% of the hot water requirements and 45% of the space heating needs for a 900 square foot office space and drafting room. The solar facility has 252 square foot of glass tube concentrator collectors and a 1000 gallon steel storage tank buried below a concrete slab floor. Freeze protection is provided by a propylene glycol/water mixture in the collector loop. The collectors are roof mounted on a variable tilt array which is adjusted seasonally and is connected to the solar thermal storage tank by a tube-in-shell heat exchanger. Incoming city water is preheated through the solar energy thermal storage tank.

  14. Overview of the Development and Installation of KEPCO Enhanced Power System Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Y.B.; Jang, G.S.; Cha, S.T. [Korea Electric Power Research Institute, Taejon (Korea)

    1999-07-01

    This paper describes design, development and implementation details of a large scale power system simulator being installed at the Kore Electric Power Research Institute. The so-called KEPCO Enhanced Power System Simulator (KEPS) will include both off line (i.e. non-real time) and on line (real time) simulation capabilities and will be used by KEPRI to study various aspects of the growing power network in Korea. A Real Time Digital simulator based on the well known RTDS hardware and software architecture will form the core of the KEPS system. A number of developments and enhancements will made to the fundamental simulation technology in order to meet some of the special requirements defined in the KEPS project. (author). 5 refs., 4 figs.

  15. Distributed Monitoring System Based on ICINGA

    CERN Document Server

    Haen, C; Neufeld, N

    2011-01-01

    The LHCb online system relies on a large and heterogeneous I.T. infrastructure : it comprises more than 2000 servers and embedded systems and more than 200 network devices. While for the control and monitoring of detectors, PLCs, and readout boards an industry standard SCADA system PVSSII has been put in production, we use a low level monitoring system to monitor the control infrastructure itself. While our previous system was based on a single central NAGIOS server, our current system uses a distributed ICINGA infrastructure.

  16. Installation of the CDC 7600 supercomputer system in the computer centre in 1972

    CERN Multimedia

    Nettz, William

    1972-01-01

    The CDC 7600 was installed in 1972 in the newly built computer centre. It was said to be the largest and most powerful computer system in Europe at that time and remained the fastest machine at CERN for 9 years. It was replaced after 12 years. Dr. Julian Blake (CERN), Dr. Tor Bloch (CERN), Erwin Gasser (Control Data Corporation), Jean-Marie LaPorte (Control Data Corporation), Peter McWilliam (Control Data Corporation), Hans Oeshlein (Control Data Corporation), and Peter Warn (Control Data Corporation) were heavily involved in this project and may appear on the pictures. William Nettz (who took the pictures) was in charge of the installation. Excerpt from CERN annual report 1972: 'Data handling and evaluation is becoming an increasingly important part of physics experiments. In order to meet these requirements a new central computer system, CDC 7600/6400, has been acquired and it was brought into more or less regular service during the year. Some initial hardware problems have disappeared but work has still to...

  17. 危险源监控视频关键帧提取初步研究%Study of key frame extraction from hazard installation monitoring video

    Institute of Scientific and Technical Information of China (English)

    王华东; 刘国柱; 李朝玲

    2012-01-01

    An approach of key frame extraction from hazard installation monitoring video is presented. Due to the characteristics of hazard installation monitoring video, DC images is compared to reduce the redundant information and get effective video. Key frame extraction algorithm based on shot for MPEG compressed video is used to get the final result. The experimental result illustrates that the approach can extract key frames from hazard installation monitoring video effectively.%提出了一种危险源监控视频关键帧提取算法.根据危险源监控视频的特点,利用I帧DC图的比较,减少危险源监控视频的冗余信息,获取有效视频;利用基于镜头的压缩域关键帧提取方法提取帧.实验结果表明,该方法能有效进行危险源监控视频关键帧的提取.

  18. Modernizing the monitoring of Mass Storage systems

    CERN Document Server

    Terrien, Alexandre

    2016-01-01

    The monitoring of a system is essential to ensure its efficiency. On a computer system, this monitoring is partly done via the analysis of log messages. The monitoring of CASTOR, a mass-storage system responsible for the storage of 150Pb of scientific data at CERN, was being done with tools developed by the IT-ST-FDO section. Those tools recently encountered some performance limitations due to the increase in the quantity of data produced by CERN's experiments. In this paper, I will describe how I managed to modernize CASTOR's monitoring tools by leveraging services centrally managed by CERN's IT department.

  19. Applications of ZigBee Technology in the Safety Monitoring System of Low Gas Pipeline Transportation

    Directory of Open Access Journals (Sweden)

    Wei Deyu

    2015-01-01

    Full Text Available The existing safety monitoring system of low gas pipeline transportation establishes a wired communication network monitoring system mainly on the basis of industrial bus. It has problems such as large transmission signal attenuation, complex wiring, high-labor intensity, inconvenient installation and maintenance, high maintenance cost, and so on. Featuring low cost, power-saving, reliability, stability and flexibility, the wireless sensor network established by ZigBee wireless communication technology can realize the real-time all-dimensional dynamic monitoring on parameters of low gas pipeline transportation system and overcome the shortcomings and deficiencies of wired network system.

  20. Real-time expert system monitors complex air regs

    Energy Technology Data Exchange (ETDEWEB)

    Hasbach, A.

    1995-07-01

    The South Coast Air Quality Management District (SCAQMD) in southern California monitors NO{sub x} emissions in real time from a total of 60 boilers at the area`s five electric utilities. SCAQMD accomplishes this with an application developed using G2, an expert system from Gensym Corp., Cambridge, Mass., interfaced to monitoring equipment at each remote facility. In 1991, the SCAQMD board passed Rule 1135 requiring monitoring of nitrogen oxide (NO{sub x}) emissions from electric-power generating systems. The rule requires utilities to transmit boiler emissions data in near real-time to SCAQMD. Each utility had to install a continuous emission monitoring system (CEMS) to measure emissions from each boiler and a remote terminal unit (RTU) to telecommunicate emissions data to SCAQMD. The CEMS acquires data from sensing devices for each boiler. The RTU collects the data, performs calculations, and transmits formatted information to the Central Station Compliance Advisory Expert System at SCAQMD. This information includes NO{sub x} emissions, power generation, fuel usage, stack gas flow and equipment status.

  1. A Self-Calibrating Remote Control Chemical Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Jessica Croft

    2007-06-01

    The Susie Mine, part of the Upper Tenmile Mining Area, is located in Rimini, MT about 15 miles southwest of Helena, MT. The Upper Tenmile Creek Mining Area is an EPA Superfund site with 70 abandoned hard rock mines and several residential yards prioritized for clean up. Water from the Susie mine flows into Tenmile Creek from which the city of Helena draws part of its water supply. MSE Technology Applications in Butte, Montana was contracted by the EPA to build a treatment system for the Susie mine effluent and demonstrate a system capable of treating mine waste water in remote locations. The Idaho National Lab was contracted to design, build and demonstrate a low maintenance self-calibrating monitoring system that would monitor multiple sample points, allow remote two-way communications with the control software and allow access to the collected data through a web site. The Automated Chemical Analysis Monitoring (ACAM) system was installed in December 2006. This thesis documents the overall design of the hardware, control software and website, the data collected while MSE-TA’s system was operational, the data collected after MSE-TA’s system was shut down and suggested improvements to the existing system.

  2. Automatic Energy Control And Monitoring System For Building

    Directory of Open Access Journals (Sweden)

    Hnin Nu Thaung

    2015-08-01

    Full Text Available The use of smart home technology in the home or building offers significant potential for energy savings. In this paper an energy management system based on wireless sensor networks. The proposed system is composed of two main components a wireless sensor network and monitoring terminal. Wireless sensors are used for sensing and transmitting electricity data and remote monitoring and control of appliances are provided to users through computer. The system enables users to save energy by monitoring and controlling appliances through terminal. This paper gives an overview of sensor technology and wireless networks in the development of an intelligent energy management system for buildings. This technology has ample potential to change the way live and work. ZigBee is used as a communication medium in building intelligent energy management system in this paper. From the prototype setup it is shown that ZigBee is a suitable technology to be adopted as the communication infrastructure in energy management system for buildings .The proposed system can be installed and maintained in residential environments with ease.

  3. Apparatus, System, And Method For Roadway Monitoring

    KAUST Repository

    Claudel, Christian G.

    2015-06-02

    An apparatus, system, and method for monitoring traffic and roadway water conditions. Traffic flow and roadway flooding is monitored concurrently through a wireless sensor network. The apparatus and system comprises ultrasound rangefinders monitoring traffic flow, flood water conditions, or both. Routing information may be calculated from the traffic conditions, such that routes are calculated to avoid roadways that are impassable or are slow due to traffic conditions.

  4. Configuration of Risk Monitor System by PLant Defense-In.Depth Monitor and Relability Monitor

    DEFF Research Database (Denmark)

    Yoshikawa, Hidekazu; Lind, Morten; Yang, Ming;

    2012-01-01

    A new method of risk monitor system of a nuclear power plant has been proposed from the aspect by what degree of safety functions incorporated in the plant system is maintained by multiple barriers of defense-in-depth (DiD). Wherein, the central idea is plant DiD risk monitor and reliability...... monitor derived from the four aspects of (i) design principle of nuclear safety to realize DiD concept, (ii) definition of risk and risk to be monitored, (iii) severe accident phenomena as major risk, (iv) scheme of risk ranking, and (v) dynamic risk display. In this paper, the overall frame...... of the proposed frame on risk monitor system is summarized and the detailed discussion is made on the definitions of major terminologies of risk, risk ranking, anatomy of fault occurrence, two-layer configuration of risk monitor, how to configure individual elements of plant DiD risk monitor and its example...

  5. Design and Tests of a New Rest Gas Ionisation Profile Monitor Installed in the SPS as a Prototype for the LHC

    CERN Document Server

    Fischer, C; Kramer, Daniel; Perret, R; Sillanoli, M; BIW'04

    2004-01-01

    Based on the encouraging results obtained with a Rest Gas Ionization Profile Monitor of a first generation, a new monitor was designed and then installed in the SPS at the beginning of 2002. Its design fulfills all the requirements for a future installation in the LHC where four such monitors are foreseen. After the initial tests performed during the run of 2002, a few upgrading steps appeared necessary mainly in order to cope with the nominal LHC beam characteristics. They were implemented during the subsequent winter stop and the operation of the monitor was resumed in 2003 under various conditions of beam, ranging from a LHC pilot bunch up to beams having in the SPS nominal distributions in bunch number, intensity and energy for injection into the LHC. After a description of the monitor design, the measurements performed with the instrument during these last two years are discussed with the difficulties encountered and the corresponding implemented cures. Data acquired in 2003 on the whole spectrum of LHC ...

  6. A microprocessor-based system for continuous monitoring of radiation levels around the CERN PS and PSB accelerators

    Science.gov (United States)

    Agoritsas, V.; Beck, F.; Benincasa, G. P.; Bovigny, J. P.

    1986-06-01

    This paper describes a new beam loss monitor system which has been installed in the PS and PSB machines, replacing an earlier system. The new system is controlled by a microprocessor which can operate independently of the accelerator control system, though setting up and central display are usually done remotely, using the standard control system facilities.

  7. Microprocessor-based system for continuous monitoring of radiation levels around the CERN PS and PSB accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Agoritsas, V.; Beck, F.; Benincasa, G.P.; Bovigny, J.P.

    1986-06-01

    This paper describes a new beam loss monitor system which has been installed in the PS and PSB machines, replacing an earlier system. The new system is controlled by a microprocessor which can operate independently of the accelerator control system, though setting up and central display are usually done remotely, using the standard control system facilities.

  8. Developing a system for AMB Monitoring

    CERN Document Server

    Hancock, Thomas

    2015-01-01

    A monitoring system for the Associative Memory Boards (AMBs) of the Fast Tracker (FTK) is developed and tested. This system is able to read out status register values from AMBs and publish them to the Information Service (IS). The system is designed so as to be easily extensible to other boards of FTK, and this is demonstrated through an extension of the systems to be able to monitor FTK Auxiliary cards. Future work will involve extensions to other FTK boards and providing a system to read from IS and present the user with the monitoring data.

  9. Design and application of electrical fire monitoring system in mining industry

    Institute of Scientific and Technical Information of China (English)

    Diao Jinxia; Zhang Guilin; Hu Haidong; Zou Zhihui; Zhang Baojin

    2015-01-01

    To protect mining areas from electrical fire, it is very important to install electrical fire monitoring system to ensure safety in development of mineral resources and for buildings. In this paper, design for electrical fire monitoring and detection system with optional sensor modules has been proposed. In addition, necessity and suitability of electrical fire monitoring and detection system with optional sensor modules in mining areas have been reviewed. The designed electrical fire monitoring and detection system suit-able for work environment of mining industry is composed by host-computer monitoring software and slave-computer detectors. Monitoring detectors are manufactured by using embedded technology. Exter-nal shells deployed have superior enclosure performances and explosion-proof properties. It is easy to install and maintain the system. In general, the system has reached, or even exceeded standards specified in national standards for performances and appearances of such devices. Test results show application of electrical fire monitoring and detection system can effectively enhance monitoring intensity over the mining areas and provide reliable guarantee to ensure orderly development of mineral resources and to protect physical and property safety of citizens in these areas.

  10. Intelligent systems installed in building of research centre for research purposes

    Science.gov (United States)

    Matusov, Jozef; Mokry, Marian; Kolkova, Zuzana; Sedivy, Stefan

    2016-06-01

    The attractiveness of intelligent buildings is nowadays directly connected with higher level of comfort and also the economic mode of consumption energy for heating, cooling and the total consumption of electricity for electric devices. The technologies of intelligent buildings compared with conventional solutions allow dynamic optimization in real time and make it easy for operational message. The basic division of functionality in horizontal direction is possible divide in to two areas such as Economical sophisticated residential care about the comfort of people in the building and Security features. The paper deals with description of intelligent systems which has a building of Research Centre. The building has installed the latest technology for utilization of renewable energy and also latest systems of controlling and driving all devices which contribute for economy operation by achieving the highest thermal comfort and overall safety.

  11. PROCEDURE FOR INSTALLING A PHOTOVOLTAIC SYSTEM ON ROOFS IN CUBAN RON CORPORATION S.A

    Directory of Open Access Journals (Sweden)

    Mayra Guzmán Villavicencio

    2017-01-01

    Full Text Available In this work, a methodological procedure developed from experiences gained during the project "Photovoltaic installation on the roofs of the Central Rum Factory for operation in self consumption and public MT grid connection” is presented, which was held along with UGAO-AINAIR signature. It is developed taking into account the need to further consolidate the dominance of this alternative energy technology, which is the first experience in such facilities for both, the rum industry and process industries in Cuba. There are no technical rules that regulate requirements to be considered during the conceptual stage of projects for the introduction of photovoltaic systems connected to the grid. The methodological procedure presented provides guidance for its application in other entities, resulting necessary its elaboration to ensure technical stability and reliability of systems during its life.

  12. Vulnerability analysis on a VPN for a remote monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Soo; Kim, Jong Soo; Park, Il Jin; Min, Kyung Sik; Choi, Young Myung [KAERI, Taejon (Korea, Republic of)

    2004-08-01

    14 Pressurized Water Reactors(PWR) in Korea use a Remote Monitoring System(RMS), which have been in Korea Since 1998. A memorandum of understanding on remote monitoring, based on enhanced cooperation on PWRs, was signed at the 10th safeguards review meeting in October 2001 between the International Atomic Energy Agency(IAEA) and Ministry Of Science and Technology(MOST). Thereafter, all PWR power plants applied for remote monitoring systems. However, the existing method is high cost (involving expensive telephone costs). So, it was eventually applied to an internet system for remote monitoring. According to the internet-based Virtual Private Network(VPN) applied to remote monitoring, the Korea Atomic Energy Research Institute(KAERI) came to an agreement with the IAEA, using a Member State Support Program(MSSP). Phase I is a lab test. Phase II is to apply it to a target power plant. Phase III is to apply it to all the power plants. This paper reports on the penetration testing of phase I. Phase I involved both domestic testing and international testing. The target of the testing consisted of a Surveillance Digital Integrated system(SDIS) server, IAEA server and TCNC(Technology Center for Nuclear Control) server. In each system, Virtual Private Network(VPN) system hardware was installed. The penetration of the three systems and the three VPNs was tested. The domestic test involved two hacking scenarios: hacking from the outside and hacking from the inside. The international test involved one scenario from the outside. The results of tests demonstrated that the VPN hardware provided a good defense against hacking. We verified that there was no invasion of the system (SDIS server and VPN; TCNC server and VPN; and IAEA server and VPN) via penetration testing.

  13. Structural health monitoring using genetic fuzzy systems

    CERN Document Server

    Pawar, Prashant M

    2014-01-01

    The high profile of structural health monitoring (SHM) will add urgency to this detailed treatment of intelligent SHM development and implementation via the evolutionary system, which uses a genetic algorithm to automate the development of the fuzzy system.

  14. Monitoring of standalone photovoltaic systems applied to rural electrification areas; Avaliacao de desempenho e identificacao de falhas em sistemas fotovoltaicos isolados aplicados a eletrificacao rural

    Energy Technology Data Exchange (ETDEWEB)

    Machado-Neto, L. V. B.; Cabral, C. V. T.; Oliveira-Filho, D.; Diniz, A. s. A. C.

    2004-07-01

    The sustainability of standalone photovoltaic systems passes through an accompaniment of the systems installed in the field. To subsidize this accompaniment it had been developed procedures for monitoring a similar system in laboratory. The standalone photovoltaic system monitored is similar to the systems installed by Companhia Energetica de Minas Gerais - CEMIG in the schools of isolated communities, inside the Solar Light Program. The system was simulated and the aims were to optimize the project and carry out a comparative study with the monitored results. The assembly procedure of the facility consisted of the implantation of the sensors, installation of acquisition boards and development of the monitoring program. The results presented here will allow the development of a program of preventive maintenance of the systems installed by CEMIG. (Author)

  15. Preliminary measurements on the new TOF system installed at the AMS beamline of INFN-LABEC

    Energy Technology Data Exchange (ETDEWEB)

    Palla, L., E-mail: palla@fi.infn.it [Dipartimento di Fisica, Università di Pisa, e INFN Sezione di Pisa (Italy); Castelli, L. [INFN Sezione di Firenze (Italy); Czelusniak, C. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Fedi, M.E. [INFN Sezione di Firenze (Italy); Giuntini, L. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Liccioli, L. [INFN Sezione di Firenze (Italy); Dipartimento di Chimica Ugo Schiff, Università di Firenze (Italy); Mandò, P.A. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Martini, M. [Dipartimento di Scienza dei Materiali, Università di Milano Bicocca, e INFN Sezione di Milano Bicocca, Milano (Italy); Mazzinghi, A. [INFN Sezione di Firenze (Italy); Dipartimento di Fisica e Astronomia, Università di Firenze (Italy); Ruberto, C. [INFN Sezione di Firenze (Italy); Dipartimento di Chimica Ugo Schiff, Università di Firenze (Italy); Schiavulli, L. [Dipartimento di Fisica, Università di Bari, e INFN Sezione di Bari (Italy); Sibilia, E. [Dipartimento di Scienza dei Materiali, Università di Milano Bicocca, e INFN Sezione di Milano Bicocca, Milano (Italy); Taccetti, F. [INFN Sezione di Firenze (Italy)

    2015-10-15

    A high resolution time of flight (TOF) system has been developed at LABEC, the 3 MV Tandem accelerator laboratory in Florence, in order to improve the sensitivity of AMS measurements on carbon samples with ultra-low concentration and also to measure other isotopes, such as {sup 129}I. The system can be employed to detect and identify residual interfering particles originated from the break-up of molecular isobars. The set-up has been specifically designed for low energy heavy ions: it consists of two identical time pick-off stations, each made up of a thin conductive foil and a Micro-Channel Plate (MCP) multiplier. The beamline is also equipped with a silicon detector, installed downstream the stop TOF station. In this paper the design of the new system and the implemented readout electronics are presented. The tests performed on the single time pick-off station are reported: they show that the maximum contribution to the timing resolution given by both the intrinsic MCP resolution and the electronics is ⩽500 ps (FWHM). For these tests, single particle pulsed beams of 2–5 MeV protons and 10 MeV {sup 12}C{sup 3+} ions, to simulate typical AMS conditions, were used. The preliminary TOF and TOF-E (TOF-energy) measurements performed with carbon beams after the installation of the new system on the AMS beam line are also discussed. These measurements were performed using the foil–MCP as the start stage and a silicon detector as the stop stage. The spectra acquired with carbon ions suggest the presence of a small residual background from neighboring masses reaching the end of the beamline with the same energy as the rare isotope.

  16. Storage monitoring systems for the year 2000

    Energy Technology Data Exchange (ETDEWEB)

    Nilsen, C.; Pollock, R.

    1997-12-31

    In September 1993, President Clinton stated the US would ensure that its fissile material meet the highest standards of safety, security, and international accountability. Frequent human inspection of the material could be used to ensure these standards. However, it may be more effective and less expensive to replace these manual inspections with virtual inspections via remote monitoring technologies. To prepare for this future, Sandia National Laboratories has developed several monitoring systems, including the Modular Integrated Monitoring System (MIMS) and Project Straight-Line. The purpose of this paper is to describe a Sandia effort that merges remote monitoring technologies into a comprehensive storage monitoring system that will meet the near-term as well as the long-term requirements for these types of systems. Topics discussed include: motivations for storage monitoring systems to include remote monitoring; an overview of the needs and challenges of providing a storage monitoring system for the year 2000; an overview of how the MIMS and Straight-Line can be enhanced so that together they create an integrated and synergistic information system by the end of 1997; and suggested milestones for 1998 and 1999 to assure steady progress in preparing for the needs of 2000.

  17. Sport monitoring with smart wearable system.

    Science.gov (United States)

    Perego, Paolo; Moltani, Alessia; Andreoni, Giuseppe

    2012-01-01

    This work presents a new system for sport monitoring. The system was composed of a t-shirt with two textile electrodes and two devices for the acquisition, storage, processing and visualization of the signals. The systems allows monitoring both ECG signal (raw and processed heart-rate) and 3 axial acceleration (raw and step counter). The systems were tested in different conditions during some races; we report the results on three subjects during a skyrunning race.

  18. 78 FR 55060 - Proposed Information Collection; Comment Request; Expanded Vessel Monitoring System Requirement...

    Science.gov (United States)

    2013-09-09

    ... commercial fishing vessels are required to install and use a vessel monitoring system (VMS) that... pilot VMS program was implemented on January 1, 2004. The pilot program required vessels registered to Pacific Coast groundfish fishery limited entry permits to carry and use VMS transceiver units...

  19. 75 FR 43487 - Proposed Information Collection; Comment Request; Vessel Monitoring System Requirements in...

    Science.gov (United States)

    2010-07-26

    ... vessel monitoring system (VMS) units on their vessels when directed to do so by NOAA enforcement personnel. VMS units automatically send periodic reports on the position of the vessel. NOAA uses the..., VMS installation and annual maintenance are considered public burden. This request combines three...

  20. The design of remote temperature monitoring system

    Science.gov (United States)

    Li, Biqing; Li, Zhao; Wei, Liuren

    2017-08-01

    This design is made on the basis of the single-chip microcomputer remote temperature monitoring system. STC89C51RC is the main core part, this design use the sensor DHT11 of temperature or humidity and wireless transceiver NRF24L01 the temperature of the test site for long-range wireless measurement and monitoring. The design contains the main system and the small system, of which the main system can show the actual test site temperature and humidity values, voice broadcast, out of control and receive data alarm function; The small system has the function of temperature and humidity, temperature monitoring and sending data. After debugging, the user customizable alarm upper and lower temperature, when the temperature exceeds limit value, the main system of buzzer alarm immediately. The system has simple structure, complete functions and can alarm in time, it can be widely used remote temperature acquisition and monitoring of the site.

  1. Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

    Science.gov (United States)

    Anchondo, Ian; Cox, Marlon; Meginnis, Carly; Westheimer, David; Vogel, Matt R.

    2016-01-01

    Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design. This advanced PLSS is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data, define set-points, evaluate control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out in 2013 and 2014 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the

  2. The CERN GSM monitoring system

    CERN Document Server

    Ghabrous, C

    2010-01-01

    This paper presents the way CERN has approached the problem of monitoring its own GSM infrastructure, especially in the Large Hadron Collider (LHC) accelerator tunnel and other underground facilities, where a leaky feeder cable carries mobile phone signals, and where this technology is the only means for inter-personnel communications

  3. Monitoring of distributed systems using historical debuggers

    Science.gov (United States)

    Komorowski, Michał

    2016-09-01

    Historical debuggers are tools that give insight into the history of program execution. This functionality is usually achieved by recording logs (execution traces). There are many tools of this kind but only limited number of them is capable of monitoring of distributed systems. It is a serious problem as the majority of contemporary information systems has distributed nature. This paper shows how to monitor and trace distributed systems using historical debuggers that were designed to work locally. The proposed concept consists of an approach for the correlation of execution traces that were recorded on different nodes of a distributed system that was monitored.

  4. Upgrade of the LHCb ECAL monitoring system

    CERN Document Server

    Guz, Yu

    2015-01-01

    The LHCb ECAL is a shashlik calorimeter of 6016 cells, covering 7.68 x 6.24 m$^2$ area. To monitor the readout chain of each ECAL cell, the LHCb ECAL is equipped with a LED based monitoring system. During the LHC Run I (2009-2012) it was found that the precision of the monitoring suffers from the radiation degradation of transparency of polystyrene clear fibers used to transport the LED light to the ECAL photomultipliers. In order to improve the performance of the monitoring system, and especially in view of significant increase of LHCb working luminosity foreseen after 2018, the present plastic fibers have been replaced by radiation hard quartzfi bers. The performance of the old LHCb ECAL monitoring system during LHC Run I and the design of the upgraded system are discussed here.

  5. A metrology system for a high resolution cavity beam position monitor system

    Science.gov (United States)

    Walston, Sean; Boogert, Stewart; Chung, Carl; Fitsos, Pete; Frisch, Joe; Gronberg, Jeff; Hayano, Hitoshi; Hinton, Shantell; Honda, Yosuke; Khainovski, Oleg; Kolomensky, Yury; Loscutoff, Peter; Lyapin, Alexey; Malton, Stephen; May, Justin; McCormick, Douglas; Meller, Robert; Miller, David; Orimoto, Toyoko; Ross, Marc; Slater, Mark; Smith, Steve; Smith, Tonee; Terunuma, Nobuhiro; Thomson, Mark; Urakawa, Junji; Vogel, Vladimir; Ward, David; White, Glen

    2013-11-01

    International Linear Collider (ILC) interaction region beam sizes and component position stability requirements will likely be as small as a few nanometers. It is important to the ILC design effort to demonstrate that these tolerances can be achieved-ideally using a beam-based stability measurement. We developed a high resolution RF cavity Beam Position Monitor (BPM) system. A triplet of these BPMs, installed in the extraction line of the KEK Accelerator Test Facility (ATF) and tested with its ultra-low emittance beam, achieved a position measurement resolution of 15 nm. A metrology system for the three BPMs was subsequently installed. This system employed optical encoders to measure each BPM's position and orientation relative to a zero-coefficient of thermal expansion carbon fiber frame. We have demonstrated that the three BPMs behave as a rigid-body at the level of less than 5 nm.

  6. An Advanced System for Monitoring Geomagnetic Environments by the Japan Meteorological Agency

    Directory of Open Access Journals (Sweden)

    Yasuhiro Yasuhiro

    2011-06-01

    Full Text Available The Japan Meteorological Agency (JMA has developed an advanced system to monitor geomagnetic environments consisting of magnetometers and monitoring cameras. The new system calculates the magnetic moments and positions of sources of artificial disturbances and then visually identifies the sources. The intensity and location of a source of artificial disturbance are calculated assuming the source is a magnetic dipole. This new system was installed at two branch observatories operated by the JMA, which will enable the remote monitoring of sites for geomagnetic observations from the headquarters at Kakioka Magnetic Observatory.

  7. Installing and Commissioning a New Radioactive Waste Tracking System - Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Robert S. Anderson; Miklos Garamszeghy; Fred Rodrigues; Ed Nicholls

    2005-05-01

    Ontario Power Generation (OPG) recognizes the importance of information management particularly with regards to its low and intermediate level waste program. Various computer based waste tracking systems have been used in OPG since the 1980s. These systems tracked the physical receipt, processing, storage, and inventory of the waste. As OPG moved towards long-term management (e.g. disposal), it was recognized that tracking of more detailed waste characterization information was important. This required either substantial modification of the existing system to include a waste characterization module or replacing it entirely with a new system. After a detailed review of available options, it was decided that the existing waste tracking application would be replaced with the Idaho National Laboratory’s (INL) Integrated Waste Tracking System (IWTS). Installing and commissioning a system which must receive historical operational waste management information (data) and provide new features, required much more attention than was originally considered. The operational readiness of IWTS required extensive vetting and preparation of historic data (which itself had been created from multiple databases in varied formats) to ensure a consistent format for import of some 30,000-container records, and merging and linking these container records to a waste stream based characterization database. This paper will discuss some of the strengths and weaknesses contributing to project success or hindrance so that others can understand and minimize the difficulties inherent in a project of this magnitude.

  8. Solar hot water system installed at Day's Lodge, Atlanta, Georgia

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    The solar energy hot water system installed in the Days Inns of America, Inc., Day's Lodge I-85 and Shallowford Road, NE Atlanta, Georgia is described. This system is one of eleven systems planned under this grant and was designed to provide for 81% of the total hot water demand. There are two separate systems, each serving one building of the lodge (total of 65 suites). The entire system contains only potable city water. The 1024 square feet of Grumman Sunstream Model 332 liquid flat plate collectors and the outside piping drains whenever the collector plates approach freezing or when power is interrupted. Solar heated water from the two above ground cement lined steel tanks (1000 gallon tank) is drawn into the electric domestic hot water (DHW) tanks as hot water is drawn. Electric resistance units in the DHW tanks top off the solar heated water, if needed, to reach thermostat setting. Operation of this system was begun in August, 1979. The solar components were partly funded ($18,042 of $36,084 cost) by the Department of Energy.

  9. Solar hot water system installed at Days Inn Motel, Jacksonville, Florida

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    The solar energy hot water system installed in the Days Inns of America, Inc., Days Inn Motel (120 rooms) I-95 and Cagle Road, Jacksonville, Florida, is described. The solar system was designed by ILI, Incorporated to provide 65 percent of the hot water demand. The system is one of eleven systems planned under this grant. Water (in the Solar Energy Products, Model CU-30ww liquid flat plate collector (900 square feet) system) automatically drains into the 1000 gallon lined and vented steel storage tank when the pump is not running. Heat is transferred from storage to Domestic Hot Water (DHW) tanks through a tube and shell heat exchanger. A circulating pump between the DHW tanks and heat exchanger enables solar heated water to help make up DHW standby losses. All pumps are controlled by differential temperature. This system was turned on June 19, 1979. The solar components were partly funded ($15,823 of $31,823 cost) by the Department of Energy.

  10. Developing Automatic System Monitoring Solution for Accanto Systems Customer Care

    OpenAIRE

    Mikkola, Markku

    2015-01-01

    The goal of the development work was to document the requirements, to develop and deploy an automatic system monitoring solution for Accanto Systems Customer Care. This final report describes Icinga Core as the backbone of the monitoring solution and presents the actual use case that was implemented for Accanto Systems. The client for this work was Accanto Systems Customer Care department which had been suffering a long time with high work load due to increased basic system monitoring tas...

  11. Using a Configuration System to Design Toilets and Place Installation Shafts

    DEFF Research Database (Denmark)

    Kudsk, Anders; Hvam, Lars; Thuesen, Christian Langhoff

    2013-01-01

    The aim of this research is to discover how configuration systems can support a product's design process when a high degree of variation is required and a very open or endless space exists for possible configurations. The article is based on an industrial case involving a firm that wishes to offer...... a bathroom configurator to architects. The aim of the configurator is to help architects design a bathroom according to relevent requirements and norms. In offering the configurator, the firm aims to enable a design that can be coordinated with a prefabricated installation shaft sold by the firm, and also...... to create customer leads. Four scenarios are developed for how design can be supported by four different types of configuration technologies. The four scenarios are evaluated in relation to a number of functional and technical requirements. The scenarios indicate that a good and varied range...

  12. Application of an industrial gas supply system to a hydrogen water chemistry installation

    Energy Technology Data Exchange (ETDEWEB)

    Lynch, D.; Kuberka, K.A.

    1988-01-01

    Equipment for a hydrogen gas supply and an oxygen gas supply was adapted to meet operating safety criteria for a hydrogen water chemistry (HWC) application at a boiling water reactor (BWR) plant. The oxygen and hydrogen gases are supplied by vaporizing cryogenic liquid drawn from storage tanks. Cryogenic storage tanks consist of an inner vessel supported within an outer vessel, with insulation in the space between vessels. The supports and product lines on the inner container are small and flexible for heat transfer and thermal flexibility considerations. Cryogenic storage tank systems inherently have low natural frequencies and must be analyzed for dynamic response to site seismic criteria. Equipment modifications to meet application criteria were made without compromising performance. The guidelines for HWC installations were supplemented by a comprehensive design safety review to assess the equipment safeguards required to control potential product releases.

  13. Installation and impact of sound field systems on hearing and hearing impaired children and their teachers

    Science.gov (United States)

    Dockrell, Julie; Rigby, Kate; Shield, Bridget; Carey, Anne

    2005-04-01

    An evaluation of the installation and use of sound field systems in ten schools in England has been carried out. The evaluation included noise surveys of classrooms, questionnaire surveys of pupils and teachers and experimental testing of children with and without the use of SFS. The aim of this project was to investigate the impact of SFS on teaching and learning in elementary school classrooms, in particular, to ascertain whether the SFS differentially benefited children with hearing impairments. Barriers to teachers use of SFS were found in terms of equipment placement and maintenance, appropriate training, and teacher's knowledge. Nonetheless positive reports are recorded from both teachers and pupils. Teachers' and pupils' perceptions are compared with objective data evaluating change in performance when SFS are used for language and cognitive tasks. Data from children with hearing impairments and additional learning needs are analyzed for comparative purposes. The results are discussed in terms of effective practice for the use of SFS with elementary school pupils.

  14. Quantify Degradation Rates and Mechanisms of PV Modules and Systems Installed in Florida Through Comprehensive Experimental and Theoretical Analysis (Poster)

    Energy Technology Data Exchange (ETDEWEB)

    Sorloaica-Hickman, N.; Davis, K.; Kurtz, S.; Jordan, D.

    2011-02-01

    The economic viability of photovoltaic (PV) technologies is inextricably tied to both the electrical performance and degradation rate of the PV systems, which are the generators of electrical power in PV systems. Over the past 15 years, performance data have been collected on numerous PV systems installed throughout the state of Florida and will be presented.

  15. Practices for improving the serviceability of linings installations in open systems

    Energy Technology Data Exchange (ETDEWEB)

    Spieres, G.V. [KTA - Tator Inc., Pittsburgh, PE (United States); Tombaugh, R.S. [PPL Susquehanna, LLC, PE (United States)

    2001-07-01

    Accelerated corrosion within nuclear plant raw water systems often necessitates in-place lining of corroded piping later in a plant's life to check corrosion. Linings are usually installed in-place, though some raw water piping and components can be lined in the site maintenance facility or even in an offsite shop. Coatings and linings have often been applied to tube sheets and channels in conjunction with re-tubing to prevent galvanic attack. Lining application practices necessary for reliability commensurate with the high quality expected in nuclear programs is often found wanting. Key process controls critical to the success of lining installations are often misunderstood or inadequately addressed. This paper reviews the critical process attributes essential to optimizing service life. These include: 1) Training workers in techniques required for a successful application; 2) Establishing and maintaining ambient controls; 3) Techniques for protecting against water intrusion; 4) Eliminating MIC and surface contaminants (e.g., chlorides); 5) Selecting the proper abrasive and blast system and containment and removal of blast debris; 6) Equipment for accelerated curing; and 7) Engineering tools essential to addressing the above key process variables. SWS linings represent the largest category of safety-related coatings outside containment. Revision 1 of U.S. Nuclear Regulatory Commission (USNRC) Regulatory Guide 1.54, which addresses safety-related coatings, was issued in July 2000. The original version only addressed containment coatings. Revision 1 references ASTM D5411-2000, which formalizes for the first time the existence of safety-related coatings both inside and outside containment. Rev. 1 of RG 1.54, on a going forward basis, links Appendix B QA/QC protocols heretofore established for containment coatings to safety-related coatings and linings outside containment. (authors)

  16. Optimising corrosion monitoring in district heating systems

    DEFF Research Database (Denmark)

    Hilbert, Lisbeth Rischel; Thorarinsdottir, R.I.; Andersen, A.

    2002-01-01

    A three-year project - financially supported by the Nordic Industrial Fund - on monitoring of corrosion in district heating systems has been initiated with participation of researchers and industrial partners in Denmark, Finland, Iceland, Norway and Sweden. The primary objective of the project...... is to improve the quality control in district heating systems by corrosion monitoring. In Danish systems electrochemical impedance spectroscopy (EIS), linear polarisation resistance (LPR), high-sensitive electrical resistance (ER) technology, crevice corrosion probes, as well as weight loss coupons...

  17. Installation and pre-commissioning of the cryogenic system of JT-60SA tokamak

    Science.gov (United States)

    Hoa, C.; Michel, F.; Roussel, P.; Fejoz, P.; Girard, S.; Goncalves, R.; Lamaison, V.; Natsume, K.; Kizu, K.; Koide, Y.; Yoshida, K.; Cardella, A.; Portone, A.; Verrecchia, M.; Wanner, M.; Beauvisage, J.; Bertholat, F.; Gaillard, G.; Heloin, V.; Langevin, B.; Legrand, J.; Maire, S.; Perrier, J. M.; Pudys, V.

    2017-02-01

    The cryogenic system for the superconducting tokamak JT-60SA is currently being commissioned in Naka, Japan and shall be ready for operation in summer 2016. This contribution is part of the Broader Approach agreement between Japan and Europe. With an equivalent refrigeration capacity of about 9.5 kW at 4.5 K the cryogenic system will supply cryo-pump panels at 3.7 K, superconducting magnets and their structures at 4.4 K, high temperature superconducting current leads at 50 K and thermal shields between 80 K and 100 K. The system has been specifically designed to handle large pulse loads at 4.4 K during plasma operation. The mechanical and electrical assembly of the cryogenic system has been achieved within six months by October 2015. The main contractor Air Liquide Advanced Technology (AL-aT) have supplied eight parallel working screw compressors with a common oil removal and dryer system, a Refrigeration Cold Box and an Auxiliary Cold box with cold rotating machines. F4E has provided six GHe storage vessels and QST has provided the complete infrastructure and the facilities for the utilities. The paper gives an overview of the main design features, the infrastructure and the status of installation and pre-commissioning.

  18. Electronics and Calibration system for the CMS Beam Halo Monitor

    CERN Document Server

    Tosi, Nicolo

    2014-01-01

    In the context of increasing luminosity of LHC, it will be important to accurately measure the Machine Induced Background. A new monitoring system will be installed in the CMS cavern for measuring the beam background at high radius. This detector is composed of synthetic quartz Cherenkov radiators, coupled to fast photomultiplier tubes (PMT). The readout chain of this detector will make use of many components developed for the Phase 1 upgrade to the CMS Hadron Calorimeter electronics, with a dedicated firmware and readout adapted to the beam monitoring requirements. The PMT signal will be digitized by a charge integrating ASIC (QIE10), providing both the signal rise time and the charge integrated over one bunch crossing.The backend electronics will record bunch-by-bunch histograms, which will be published to CMS and the LHC using the newly designed CMS beam instrumentation specific DAQ. A calibration monitoring system has been designed to generate triggered pulses of light to monitor the efficiency of the sys...

  19. Experimental validation of a mine-wide continuous closure monitoring system as a decision making tool for gold mines.

    CSIR Research Space (South Africa)

    Malan, DF

    2003-03-01

    Full Text Available of a mine-wide continuous closure monitoring system. A RMT remote reading telltale system was modified to operate as a closure system and installed at Mponeng Mine. Unfortunately, this system did not succeed in collecting data from a large number...

  20. A conceptual framework for intelligent monitoring systems

    Science.gov (United States)

    Juliano, Thomas; Meegoda, Jay; Niver, Edip; Watts, Daniel; Wadhawan, Sameer; Finlayson, Richard

    2005-05-01

    This paper discusses the conceptual development of a continuously monitored intelligent system for underground infrastructure. The proposed sensors are based on advanced coupling and refinement of several technologies: electrically conducting composite pipe (ECCP), electrochemical impedance spectroscopy (EIS) and time domain reflectometry (TDR). A significant benefit gleaned from the combination of these technologies is that the resulting system may be used on non-metallic, as well as, metallic pipes. In addition, the synergism of the technologies obtains the maximum information regarding defect location and characterization. The monitoring signal, waveguides, and damage sensor are also discussed, as well as, the data fusion, dynamic modeling and simulation requirements for the intelligent monitoring system.

  1. Research on monitoring system for slope deformation

    Institute of Scientific and Technical Information of China (English)

    LIU Xiao-sheng; ZHANG Xue-zhuang; WANG Ai-gong

    2007-01-01

    The monitoring system for slope deformation which bases on Leica (TCA series)was researched and developed. This system consists of electronic total stations, high precision thermometer, digital barometer, photoelectric frequency adjustor and other related instruments and data collection and processing software. The system can monitor a series of targets automatically to obtain accurate data of distance at predetermined time, besides,it can timely display targets' coordinates and deformation value, velocity, etc. in graph as well. To compare of the results of different monitoring time, we can find the problems of mine slope deformation rapidly and accurately.

  2. Test Results of a Phi Monitoring System

    CERN Document Server

    Figueroa, Carlos; Burgos, C; Ferrrando, A; Matorras, Francisco; Molinero, Antonio; Rodriguo, T; Shvachkin, V

    1997-01-01

    The development and tests of a Phi monitoring system prototype designed for the CMS Muon Spectrometer alignment are described. The system, using a sweeping laser beam, defines a light reference plane to be used for the continuous monitoring of the Muon detectors. The performance of the system in the Laboratory was satisfactory. It showed good stability and linearity response behaviour. With the appropriate selection of components it can monitor large range position shifts ( up to 1-2 cm) with good accuracy at long distances ( ~ 60 mu accuracy at 10 m).

  3. Field validation of cable monitoring and rating system (CMARS) laboratory model. Semi-annual report, 1 May 1979-31 December 1979

    Energy Technology Data Exchange (ETDEWEB)

    Englehardt, J.; Harris, H.; Kasny, E.; Orifice, D.; Patton, R.; Sottovia, P.

    1980-01-01

    One year of research on validating the performance of the Cable Monitoring and Rating System (CMARS) is reported. The performance testing was conducted on underground 230-kV and 345-kV pipe type cable circuits owned by the New Jersey Public Service Electric and Gas Co. Laser temperature monitoring systems and a data acquisition system were installed. Software installation and development is discussed. The CMARS testing program is described. (LCL)

  4. Performance Monitoring Applied to System Supervision

    Directory of Open Access Journals (Sweden)

    Bertille Somon

    2017-07-01

    Full Text Available Nowadays, automation is present in every aspect of our daily life and has some benefits. Nonetheless, empirical data suggest that traditional automation has many negative performance and safety consequences as it changed task performers into task supervisors. In this context, we propose to use recent insights into the anatomical and neurophysiological substrates of action monitoring in humans, to help further characterize performance monitoring during system supervision. Error monitoring is critical for humans to learn from the consequences of their actions. A wide variety of studies have shown that the error monitoring system is involved not only in our own errors, but also in the errors of others. We hypothesize that the neurobiological correlates of the self-performance monitoring activity can be applied to system supervision. At a larger scale, a better understanding of system supervision may allow its negative effects to be anticipated or even countered. This review is divided into three main parts. First, we assess the neurophysiological correlates of self-performance monitoring and their characteristics during error execution. Then, we extend these results to include performance monitoring and error observation of others or of systems. Finally, we provide further directions in the study of system supervision and assess the limits preventing us from studying a well-known phenomenon: the Out-Of-the-Loop (OOL performance problem.

  5. Air Quality Monitoring System and Benchmarking

    DEFF Research Database (Denmark)

    Liu, Xiufeng; Nielsen, Per Sieverts

    2017-01-01

    Air quality monitoring has become an integral part of smart city solutions. This paper presents an air quality monitoring system based on Internet of Things (IoT) technologies, and establishes a cloud-based platform to address the challenges related to IoT data management and processing...

  6. Blood monitoring systems and methods thereof

    Science.gov (United States)

    Mir, Jose (Inventor); Zander, Dennis (Inventor)

    2012-01-01

    A blood monitoring system is capable of monitoring the blood of a subject in vivo. The blood monitoring system comprises: 1) an array of movable microneedle micromachined within associated wells; 2) array of motion actuators able to move each needle in and out of their associated wells; 3) array of microvalves associated with each microneedle able to control the flow of air around the microneedle; 4) an array of chemical sensors inserted into patient by movable microneedles; 5) an array of inductors able to measure chemical concentration in the vicinity of inserted chemical sensors; 6) conducting vias that provide timed actuating signal signals from a control system to each motion actuator; 7) conducting vias that transmit signal produced by array of chemical sensors to the control system for processing, although the blood monitoring system can comprise other numbers and types of elements in other configurations.

  7. Tracking the Sun VIII. The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen L. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naïm R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Spears, Mike [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Buckley, Michael [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States); Grue, Nick [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-08-01

    Now in its eighth edition, Lawrence Berkeley National Laboratory (LBNL)’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected solar photovoltaic (PV) systems in the United States. The present report focuses on residential and nonresidential systems installed through year-end 2014, with preliminary trends for the first half of 2015. As noted in the text box below, this year’s report incorporates a number of important changes and enhancements. Among those changes, this year's report focuses solely on residential and nonresidential PV systems; data on utility-scale PV are reported in LBNL’s companion Utility-Scale Solar report series. Installed pricing trends presented within this report derive primarily from project-level data reported to state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. In total, data were collected for roughly 400,000 individual PV systems, representing 81% of all U.S. residential and non-residential PV capacity installed through 2014 and 62% of capacity installed in 2014, though a smaller subset of this data were used in analysis.

  8. Data processing for water monitoring system

    Science.gov (United States)

    Monford, L.; Linton, A. T.

    1978-01-01

    Water monitoring data acquisition system is structured about central computer that controls sampling and sensor operation, and analyzes and displays data in real time. Unit is essentially separated into two systems: computer system, and hard wire backup system which may function separately or with computer.

  9. COMPREHENSIVE DIAGNOSTIC AND IMPROVEMENT TOOLS FOR HVAC-SYSTEM INSTALLATIONS IN LIGHT COMMERCIAL BUILDINGS

    Energy Technology Data Exchange (ETDEWEB)

    Abram Conant; Mark Modera; Joe Pira; John Proctor; Mike Gebbie

    2004-10-31

    Proctor Engineering Group, Ltd. (PEG) and Carrier-Aeroseal LLP performed an investigation of opportunities for improving air conditioning and heating system performance in existing light commercial buildings. Comprehensive diagnostic and improvement tools were created to address equipment performance parameters (including airflow, refrigerant charge, and economizer operation), duct-system performance (including duct leakage, zonal flows and thermal-energy delivery), and combustion appliance safety within these buildings. This investigation, sponsored by the National Energy Technology Laboratory, a division of the U.S. Department of Energy, involved collaboration between PEG and Aeroseal in order to refine three technologies previously developed for the residential market: (1) an aerosol-based duct sealing technology that allows the ducts to be sealed remotely (i.e., without removing the ceiling tiles), (2) a computer-driven diagnostic and improvement-tracking tool for residential duct installations, and (3) an integrated diagnosis verification and customer satisfaction system utilizing a combined computer/human expert system for HVAC performance. Prior to this work the aerosol-sealing technology was virtually untested in the light commercial sector--mostly because the savings potential and practicality of this or any other type of duct sealing had not been documented. Based upon the field experiences of PEG and Aeroseal, the overall product was tailored to suit the skill sets of typical HVAC-contractor personnel.

  10. Recommendations for the design and the installation of large laser scanning microscopy systems

    Science.gov (United States)

    Helm, P. Johannes

    2012-03-01

    Laser Scanning Microscopy (LSM) has since the inventions of the Confocal Scanning Laser Microscope (CLSM) and the Multi Photon Laser Scanning Microscope (MPLSM) developed into an essential tool in contemporary life science and material science. The market provides an increasing number of turn-key and hands-off commercial LSM systems, un-problematic to purchase, set up and integrate even into minor research groups. However, the successful definition, financing, acquisition, installation and effective use of one or more large laser scanning microscopy systems, possibly of core facility character, often requires major efforts by senior staff members of large academic or industrial units. Here, a set of recommendations is presented, which are helpful during the process of establishing large systems for confocal or non-linear laser scanning microscopy as an effective operational resource in the scientific or industrial production process. Besides the description of technical difficulties and possible pitfalls, the article also illuminates some seemingly "less scientific" processes, i.e. the definition of specific laboratory demands, advertisement of the intention to purchase one or more large systems, evaluation of quotations, establishment of contracts and preparation of the local environment and laboratory infrastructure.

  11. Solar hot water system installed at Days Inn Motel, Dallas, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    The solar energy hot water system installed in the Days Inn of America, Inc., Days Inn Motel (100 rooms), I-635/2753 Forrest Lane, Dallas, Texas is described. The solar system was designed by ILI, Inc., to provide 65% of the total Domestic Hot Water (DHW) demand. The liquid flat plate (water) collector is 1000 square feet of solar energy products, Model CU-30W array. Water in the collector system automatically drains into the 1000 gallon steel storage tank located in the mechanical room when the pump is not running. Heat is transferred from the storage tank to DHW tanks through a tube and shell heat exchanger. A circulating pump between the DHW tanks and the heat exchanger enables solar heated water to help make up DHW tank standby losses. All pumps are controlled by differential temperature. Operation of this system was begun March 11, 1980. The solar components were partly funded ($15,000 of $30,000 cost) by the Department of Energy Grant.

  12. Design, installation, commissioning and operation of a beamlet monitor in the negative ion beam test stand at NIFS

    Energy Technology Data Exchange (ETDEWEB)

    Antoni, V.; Agostinetti, P.; Brombin, M.; Cervaro, V.; Delogu, R.; Fasolo, D.; Franchin, L.; Ghiraldelli, R.; Molon, F.; Pasqualotto, R.; Serianni, G., E-mail: gianluigi.serianni@igi.cnr.it; Tollin, M.; Veltri, P. [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA) (Italy); De Muri, M. [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA) (Italy); INFN-LNL, v.le dell' Università 2, I-35020, Legnaro (PD) Italy (Italy); Ikeda, K.; Kisaki, M.; Nakano, H.; Takeiri, Y.; Tsumori, K. [National Institute for Fusion Science, 322-6 Oroshi, Toki, Gifu 509-5292 (Japan); Muraro, A. [Istituto di Fisica del Plasma (IFP-CNR) – Via Cozzi 53, 20125, Milano (Italy)

    2015-04-08

    In the framework of the accompanying activity for the development of the two neutral beam injectors for the ITER fusion experiment, an instrumented beam calorimeter is being designed at Consorzio RFX, to be used in the SPIDER test facility (particle energy 100keV; beam current 50A), with the aim of testing beam characteristics and to verify the source proper operation. The main components of the instrumented calorimeter are one-directional carbon-fibre-carbon composite tiles. Some prototype tiles have been used as a small-scale version of the entire calorimeter in the test stand of the neutral beam injectors of the LHD experiment, with the aim of characterising the beam features in various operating conditions. The extraction system of the NIFS test stand source was modified, by applying a mask to the first gridded electrode, in order to isolate only a subset of the beamlets, arranged in two 3×5 matrices, resembling the beamlet groups of the ITER beam sources. The present contribution gives a description of the design of the diagnostic system, including the numerical simulations of the expected thermal pattern. Moreover the dedicated thermocouple measurement system is presented. The beamlet monitor was successfully used for a full experimental campaign, during which the main parameters of the source, mainly the arc power and the grid voltages, were varied. This contribution describes the methods of fitting and data analysis applied to the infrared images of the camera to recover the beamlet optics characteristics, in order to quantify the response of the system to different operational conditions. Some results concerning the beamlet features are presented as a function of the source parameters.

  13. Design, installation, commissioning and operation of a beamlet monitor in the negative ion beam test stand at NIFS

    Science.gov (United States)

    Antoni, V.; Agostinetti, P.; Brombin, M.; Cervaro, V.; Delogu, R.; De Muri, M.; Fasolo, D.; Franchin, L.; Ghiraldelli, R.; Ikeda, K.; Kisaki, M.; Molon, F.; Muraro, A.; Nakano, H.; Pasqualotto, R.; Serianni, G.; Takeiri, Y.; Tollin, M.; Tsumori, K.; Veltri, P.

    2015-04-01

    In the framework of the accompanying activity for the development of the two neutral beam injectors for the ITER fusion experiment, an instrumented beam calorimeter is being designed at Consorzio RFX, to be used in the SPIDER test facility (particle energy 100keV; beam current 50A), with the aim of testing beam characteristics and to verify the source proper operation. The main components of the instrumented calorimeter are one-directional carbon-fibre-carbon composite tiles. Some prototype tiles have been used as a small-scale version of the entire calorimeter in the test stand of the neutral beam injectors of the LHD experiment, with the aim of characterising the beam features in various operating conditions. The extraction system of the NIFS test stand source was modified, by applying a mask to the first gridded electrode, in order to isolate only a subset of the beamlets, arranged in two 3×5 matrices, resembling the beamlet groups of the ITER beam sources. The present contribution gives a description of the design of the diagnostic system, including the numerical simulations of the expected thermal pattern. Moreover the dedicated thermocouple measurement system is presented. The beamlet monitor was successfully used for a full experimental campaign, during which the main parameters of the source, mainly the arc power and the grid voltages, were varied. This contribution describes the methods of fitting and data analysis applied to the infrared images of the camera to recover the beamlet optics characteristics, in order to quantify the response of the system to different operational conditions. Some results concerning the beamlet features are presented as a function of the source parameters.

  14. Hydraulic Shuttle Irradiation System (HSIS) Recently Installed in the Advanced Test Reactor (ATR)

    Energy Technology Data Exchange (ETDEWEB)

    A. Joseph Palmer; Gerry L. McCormick; Shannon J. Corrigan

    2010-06-01

    2010 International Congress on Advances in Nuclear Power Plants (ICAPP’10) ANS Annual Meeting Imbedded Topical San Diego, CA June 13 – 17, 2010 Hydraulic Shuttle Irradiation System (HSIS) Recently Installed in the Advanced Test Reactor (ATR) Author: A. Joseph Palmer, Mechanical Engineer, Irradiation Test Programs, 208-526-8700, Joe.Palmer@INL.gov Affiliation: Idaho National Laboratory P.O. Box 1625, MS-3840 Idaho Falls, ID 83415 INL/CON-10-17680 ABSTRACT Most test reactors are equipped with shuttle facilities (sometimes called rabbit tubes) whereby small capsules can be inserted into the reactor and retrieved during power operations. With the installation of Hydraulic Shuttle Irradiation System (HSIS) this capability has been restored to the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The general design and operating principles of this system were patterned after the hydraulic rabbit at Oak Ridge National Laboratory’s (ORNL) High Flux Isotope Reactor (HFIR), which has operated successfully for many years. Using primary coolant as the motive medium the HSIS system is designed to simultaneously transport fourteen shuttle capsules, each 16 mm OD x 57 mm long, to and from the B-7 position of the reactor. The B-7 position is one of the higher flux positions in the reactor with typical thermal and fast (>1 Mev) fluxes of 2.8E+14 n/cm2/sec and 1.9E+14 n/cm2/sec respectively. The available space inside each shuttle is approximately 14 mm diameter x 50 mm long. The shuttle containers are made from titanium which was selected for its low neutron activation properties and durability. Shuttles can be irradiated for time periods ranging from a few minutes to several months. The Send and Receive Station (SRS) for the HSIS is located 2.5 m deep in the ATR canal which allows irradiated shuttles to be easily moved from the SRS to a wet loaded cask, or transport pig. The HSIS system first irradiated (empty) shuttles in September 2009 and has since completed

  15. Demonstration of new frequency-based flame monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Khesin, M. [MK Engineering Inc., North Andover, MA (United States)

    1996-11-01

    Methods of flame monitoring and combustion diagnostics based on analysis of temporal frequency spectra of flame radiation are attracting growing attention. It has been demonstrated that valuable flame quality information can be extracted from the chaos of burner flames by applying advanced signal analysis. A new flame diagnostics system (Flamenco), based on the application of new signal processing algorithms, have been developed and tested. The system generates an array of statistical values correlating with main combustion parameters of individual burner flames. Along with the main system, several derivative software systems were developed to enhance the testing and analysis capabilities. This paper presents preliminary results of pilot-scale testing of the new system, conducted at a single-burner combustion test facility, with support of Forney Corporation. Pilot-scale testing was conducted on a 1.0 Mbtu/hr single-burner gas-fired boiler, equipped with analytical instrumentation to measure NOx, O{sub 2}, CO{sub 2} and CO. The tests were conducted for the full range of air flow changes at different loads. The results have proven that the new system generates output signals correlated with measured burner parameters, such as NOx and airflow. The new system offers an effective and economical new method of flame monitoring and combustion diagnostics, to facilitate balancing and adjustment of individual burners and it is applicable to both single and multi-burner installations.

  16. A plasma process monitor/control system

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, J.O.; Ward, P.P.; Smith, M.L. [Sandia National Labs., Albuquerque, NM (United States); Markle, R.J. [Advanced Micro Devices, Inc., Austin, TX (United States)

    1997-08-01

    Sandia National Laboratories has developed a system to monitor plasma processes for control of industrial applications. The system is designed to act as a fully automated, sand-alone process monitor during printed wiring board and semiconductor production runs. The monitor routinely performs data collection, analysis, process identification, and error detection/correction without the need for human intervention. The monitor can also be used in research mode to allow process engineers to gather additional information about plasma processes. The plasma monitor can perform real-time control of support systems known to influence plasma behavior. The monitor can also signal personnel to modify plasma parameters when the system is operating outside of desired specifications and requires human assistance. A notification protocol can be selected for conditions detected in the plasma process. The Plasma Process Monitor/Control System consists of a computer running software developed by Sandia National Laboratories, a commercially available spectrophotometer equipped with a charge-coupled device camera, an input/output device, and a fiber optic cable.

  17. A System for Monitoring Affective Objectives.

    Science.gov (United States)

    Hughes, Abby L.; Frommer, Karen

    1982-01-01

    Based on the belief that affective education cannot be left to an informal process of "warm fuzzies," the system described here is a structured instructional program with specific affective objectives and a scale for monitoring achievement. (Author/JM)

  18. Automatic calorimetry system monitors RF power

    Science.gov (United States)

    Harness, B. W.; Heiberger, E. C.

    1969-01-01

    Calorimetry system monitors the average power dissipated in a high power RF transmitter. Sensors measure the change in temperature and the flow rate of the coolant, while a multiplier computes the power dissipated in the RF load.

  19. Modular biowaste monitoring system conceptual design

    Science.gov (United States)

    Fogal, G. L.

    1974-01-01

    The objective of the study was to define requirements and generate a conceptual design for a Modular Biowaste Monitoring System for specifically supporting shuttle life science experimental and diagnostic programs.

  20. Characterization of a New Continuous Air Monitoring System For the University of Massachusetts Lowell Research Reactor

    Science.gov (United States)

    Alqahtani, Mohammad Saad

    A continuous air monitor (CAM) is a critical piece of equipment to support radiation safety in nuclear facilities where the generation of airborne radioactivity is a possibility for either normal operations or accident scenarios. The University of Massachusetts Lowell Research Reactor is planning to install a new CAM system manufactured by Canberra Industries for monitoring airborne radioactive particulates. In this study, the new CAM was evaluated to determine 1) baseline response, 2) response to high exposure rates, 3) appropriate background compensation, 4) detection limits, and 5) alarm settings. The results of this study will help to properly integrate the new CAM into the reactor radiation monitoring system.

  1. Solar heating and cooling system installed at Leavenworth, Kansas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Perkins, R. M.

    1980-06-01

    The solar heating and cooling system installed at the headquarters of Citizens Mutual Savings Association in Leavenworth, Kansas, is described in detail. The project is part of the U.S. Department of Energy's solar demonstration program and became operational in March, 1979. The designer was TEC, Inc. Consulting Engineers, Kansas City, Missouri and contractor was Norris Brothers, Inc., Lawrence, Kansas. The solar system is expected to furnish 90 percent of the overall heating load, 70 percent of the cooling load and 100 percent of the domestic hot water load. The building has two floors with a total of 12,000 square feet gross area. The system has 120 flat-plate liquid solar panels with a net area of 2200 square feet. Five, 3-ton Arkla solar assisted absorption units provide the cooling, in conjunction with a 3000 gallon chilled water storage tank. Two, 3000 gallon storage tanks are provided with one designated for summer use, whereas both tanks are utilized during winter.

  2. Class 3 Tracking and Monitoring System Report

    Energy Technology Data Exchange (ETDEWEB)

    Safely, Eugene; Salamy, S. Phillip

    1999-11-29

    The objective of Class 3 tracking system are to assist DOE in tracking and performance and progress of these projects and to capture the technical and financial information collected during the projects' monitoring phase. The captured information was used by DOE project managers and BDM-Oklahoma staff for project monitoring and evaluation, and technology transfer activities. The proposed tracking system used the Class Evaluation Executive Report (CLEVER), a relation database for storing and disseminating class project data; GeoGraphix, a geological and technical analysis and mapping software system; the Tertiary Oil Recovery Information System (TORIS) database; and MS-Project, a project management software system.

  3. Shafting Alignment Computing Method of New Multibearing Rotor System under Specific Installation Requirement

    Directory of Open Access Journals (Sweden)

    Qian Chen

    2016-01-01

    Full Text Available The shafting of large steam turbine generator set is composed of several rotors which are connected by couplings. The computing method of shafting with different structure under specific installation requirement is studied in this paper. Based on three-moment equation, shafting alignment mathematical model is established. The computing method of bearing elevations and loads under corresponding installation requirements, where bending moment of each coupling is zero and there exist preset sag and gap in some couplings, is proposed, respectively. Bearing elevations and loads of shafting with different structure under specific installation requirement are calculated; calculation results are compared with installation data measured on site which verifies the validity and accuracy of the proposed shafting alignment computing method. The above work provides a reliable approach to analyze shafting alignment and could guide installation on site.

  4. Monitoring System for ALICE Surface Areas

    CERN Document Server

    Demirbasci, Oguz

    2016-01-01

    I have been at CERN for 12 weeks within the scope of Summer Student Programme working on a monitoring system project for surface areas of the ALICE experiment during this period of time. The development and implementation of a monitoring system for environmental parameters in the accessible areas where a cheap hardware setup can be deployed were aim of this project. This report explains how it was developed by using Arduino, Raspberry PI, WinCC OA and DIM protocol.

  5. OPTIMIZATION METHODS FOR HYDROECOLOGICAL MONITORING SYSTEMS

    OpenAIRE

    Inna Pivovarova

    2016-01-01

    The paper describes current approaches to the rational distribution of monitoring stations. A short review and the organization of the system of hydro-geological observations in different countries are presented. On the basis of real data we propose a solution to the problem of how to calculate the average area per one hydrological station, which is the main indicator of the efficiency and performance of the monitoring system in general. We conclude that a comprehensive approach to the monito...

  6. Development of wall conditioning and impurity monitoring systems in Versatile Experiment Spherical Torus (VEST)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, H.Y., E-mail: brbbebbero@snu.ac.kr [Seoul National University, Seoul (Korea, Republic of); Yang, J.; Kim, Y.G.; Yang, S.M.; Kim, Y.S.; Lee, K.H. [Seoul National University, Seoul (Korea, Republic of); An, Y.H. [National Fusion Research Institute, Daejon (Korea, Republic of); Chung, K.J.; Na, Y.S. [Seoul National University, Seoul (Korea, Republic of); Hwang, Y.S., E-mail: yhwang@snu.ac.kr [Seoul National University, Seoul (Korea, Republic of)

    2016-11-01

    Highlights: • The baking for partial wall heating and H{sub 2}/He GDC systems are developed in VEST. • The RGA and OES systems for monitoring impurities are constructed in VEST. • The partial baking and He GDC show limited effects on plasma characteristics. • H{sub 2} GDC above 4 h enables the longer plasma current duration up to ∼15 ms. • After H{sub 2} GDC, the discharge should be conducted within 3 h from treatment. - Abstract: Wall conditioning and impurity monitoring systems are developed in Versatile Experiment Spherical Torus (VEST). As a wall conditioning system, a baking system covering the vacuum vessel wall partially and a glow discharge cleaning (GDC) system using two electrodes with dc and 50 kHz power supplies are installed. The GDC system operates with hydrogen and helium gases for both chemical and physical desorption. The impurity monitoring system with residual gas analyzer (RGA), operating at <10{sup −5} Torr with a differential pumping system, is installed along with the optical emission spectroscopy (OES) system to monitor the hydrogen and impurity radiation lines. Effects of these wall conditioning techniques are investigated with the impurity monitoring system for ohmic discharges of VEST. The partial baking and He GDC show limited effects on plasma characteristics but sufficient H{sub 2} GDC above 4 h enables the longer plasma current duration up to ∼15 ms within 3 h from the end of treatment.

  7. AUTOMOTIVE DIESEL MAINTENANCE L. UNIT XII, PART I--MAINTAINING THE FUEL SYSTEM (PART II), CUMMINS DIESEL ENGINE, PART II--UNIT INSTALLATION (ENGINE).

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…

  8. Integrated online condition monitoring system for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hashemian, Hashem M. [Analysis and Measurement Services Corporation, Knoxville, TN (United States). AMS Technology Center

    2010-09-15

    Online condition monitoring or online monitoring (OLM) uses data acquired while a nuclear power is operating to continuously assess the health of the plant's sensors, processes, and equipment; to measure the dynamic performance of the plant's process instrumentation; to verify in-situ the calibration of the process instrumentation; to detect blockages, voids, and leaks in the pressure sensing lines; to identify core flow anomalies; to extend the life of neutron detectors and other sensors; and to measure the vibration of reactor internals. Both the steady-state or DC output of plant sensors and their AC signal or noise output can be used to assess sensor health, depending on whether the application is monitoring a rapidly changing (e.g., core barrel motion) or a slowly changing (e.g., sensor calibration) process. The author has designed, developed, installed, and tested OLM systems (comprised of software/hardware-based data acquisition and data processing modules) that integrate low-frequency (1 mHz to 1 Hz) techniques such as RTD cross-calibration, pressure transmitter calibration monitoring, and equipment condition monitoring and high-frequency (1 Hz to 1 kHz) techniques such as the noise analysis technique. The author has demonstrated the noise analysis technique's effectiveness for measuring the dynamic response-time of pressure transmitters and their sensing lines; for performing predictive maintenance on reactor internals; for detecting core flow anomalies; and for extending neutron detector life. Integrated online condition monitoring systems can combine AC and DC data acquisition and signal processing techniques, can use data from existing process sensors during all modes of plant operation, including startup, normal operation, and shutdown; can be retrofitted into existing PWRs, BWRs, and other reactor types and will be integrated into next-generation plants. (orig.)

  9. BABY MONITORING SYSTEM USING WIRELESS SENSOR NETWORKS

    Directory of Open Access Journals (Sweden)

    G. Rajesh

    2014-09-01

    Full Text Available Sudden Infant Death Syndrome (SIDS is marked by the sudden death of an infant during sleep that is not predicted by the medical history and remains unexplained even after thorough forensic autopsy and detailed death investigation. In this we developed a system that provides solutions for the above problems by making the crib smart using the wireless sensor networks (WSN and smart phones. The system provides visual monitoring service through live video, alert services by crib fencing and awakens alert, monitoring services by temperature reading and light intensity reading, vaccine reminder and weight monitoring.

  10. Monitoring the CMS data acquisition system

    Science.gov (United States)

    Bauer, G.; Behrens, U.; Biery, K.; Branson, J.; Cano, E.; Cheung, H.; Ciganek, M.; Cittolin, S.; Coarasa, J. A.; Deldicque, C.; Dusinberre, E.; Erhan, S.; Fortes Rodrigues, F.; Gigi, D.; Glege, F.; Gomez-Reino, R.; Gutleber, J.; Hatton, D.; Laurens, J. F.; Lopez Perez, J. A.; Meijers, F.; Meschi, E.; Meyer, A.; Mommsen, R.; Moser, R.; O'Dell, V.; Oh, A.; Orsini, L. B.; Patras, V.; Paus, C.; Petrucci, A.; Pieri, M.; Racz, A.; Sakulin, H.; Sani, M.; Schieferdecker, P.; Schwick, C.; Shpakov, D.; Simon, S.; Sumorok, K.; Zanetti, M.

    2010-04-01

    The CMS data acquisition system comprises O(20000) interdependent services that need to be monitored in near real-time. The ability to monitor a large number of distributed applications accurately and effectively is of paramount importance for robust operations. Application monitoring entails the collection of a large number of simple and composed values made available by the software components and hardware devices. A key aspect is that detection of deviations from a specified behaviour is supported in a timely manner, which is a prerequisite in order to take corrective actions efficiently. Given the size and time constraints of the CMS data acquisition system, efficient application monitoring is an interesting research problem. We propose an approach that uses the emerging paradigm of Web-service based eventing systems in combination with hierarchical data collection and load balancing. Scalability and efficiency are achieved by a decentralized architecture, splitting up data collections into regions of collections. An implementation following this scheme is deployed as the monitoring infrastructure of the CMS experiment at the Large Hadron Collider. All services in this distributed data acquisition system are providing standard web service interfaces via XML, SOAP and HTTP [15,22]. Continuing on this path we adopted WS-* standards implementing a monitoring system layered on top of the W3C standards stack. We designed a load-balanced publisher/subscriber system with the ability to include high-speed protocols [10,12] for efficient data transmission [11,13,14] and serving data in multiple data formats.

  11. Wire system aging assessment and condition monitoring (WASCO)

    Energy Technology Data Exchange (ETDEWEB)

    Fantoni, P.F. [Institutt for energiteknikk (Norway); Nordlund, A. [Chalmers Univ. of Technology (Sweden)

    2006-04-15

    Nuclear facilities rely on electrical wire systems to perform a variety of functions for successful operation. Many of these functions directly support the safe operation of the facility; therefore, the continued reliability of wire systems, even as they age, is critical. Condition Monitoring (CM) of installed wire systems is an important part of any aging program, both during the first 40 years of the qualified life and even more in anticipation of the license renewal for a nuclear power plant. This report describes a method for wire system condition monitoring, developed at the Halden Reactor Project, which is based on Frequency Domain Reflectometry. This method resulted in the development of a system called LIRA (LIne Resonance Analysis), which can be used on-line to detect any local or global changes in the cable electrical parameters as a consequence of insulation faults or degradation. LIRA is composed of a signal generator, a signal analyser and a simulator that can be used to simulate several failure/degradation scenarios and assess the accuracy and sensitivity of the LIRA system. Chapter 5 of this report describes an complementary approach based on positron measurement techniques, used widely in defect physics due to the high sensitivity to micro defects, in particular open volume defects. This report describes in details these methodologies, the results of field experiments and the proposed future work. (au)

  12. CVD Diamonds in the BaBar Radiation Monitoring System

    CERN Document Server

    Bruinsma, M; Edwards, A J; Kagan, H; Kass, R; Kirkby, D; Petersen, B A

    2006-01-01

    To prevent excessive radiation damage to its Silicon Vertex Tracker, the BaBar experiment at SLAC uses a radiation monitoring and protection system that triggers a beam abort whenever radiation levels are anomalously high. The existing system, which employs large area Si PIN diodes as radiation sensors, has become increasingly difficult to operate due to radiation damage. We have studied CVD diamond sensors as a potential alternative for these silicon sensors. Two diamond sensors have been routinely used since their installation in the Vertex Tracker in August 2002. The experience with these sensors and a variety of tests in the laboratory have shown CVD diamonds to be a viable solution for dosimetry in high radiation environments. However, our studies have also revealed surprising side-effects.

  13. The Inclined Pipe Installation and Monitoring Method of Deep Foundation Pit%浅析深基坑测斜管安装与监测方法

    Institute of Scientific and Technical Information of China (English)

    2013-01-01

      笔者结合自身在多个广州地铁车站深基坑施工过程中的实际工作经验,对地连续墙测斜监测项目中测斜管的安装、测斜数据的采集及整理等方面进行浅析。%The author combined with own actual work exper-ience in Guangzhou subway station deep foundation pit cons-truction process, analyzes instal ation, testing data col ection a-nd col ation of the continuous wal inclined monitoring project.

  14. 105KE Basin Area Radiation Monitor System (ARMS) Acceptance Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    KINKEL, C.C.

    1999-12-14

    This procedure is intended for the Area Radiation Monitoring System, ARMS, that is replacing the existing Programmable Input-Output Processing System, PIOPS, radiation monitoring system in the 105KE basin. The new system will be referred to as the 105KE ARMS, 105KE Area Radiation Monitoring System. This ATP will ensure calibration integrity of the 105KE radiation detector loops. Also, this ATP will test and document the display, printing, alarm output, alarm acknowledgement, upscale check, and security functions. This ATP test is to be performed after completion of the 105KE ARMS installation. The alarm outputs of the 105KE ARMS will be connected to the basin detector alarms, basin annunciator system, and security Alarm Monitoring System, AMS, located in the 200 area Central Alarm Station (CAS).

  15. 105KE Basin Area Radiation Monitor System (ARMS) Acceptance Test Procedure

    CERN Document Server

    Kinkel, C C

    1999-01-01

    This procedure is intended for the Area Radiation Monitoring System, ARMS, that is replacing the existing Programmable Input-Output Processing System, PIOPS, radiation monitoring system in the 105KE basin. The new system will be referred to as the 105KE ARMS, 105KE Area Radiation Monitoring System. This ATP will ensure calibration integrity of the 105KE radiation detector loops. Also, this ATP will test and document the display, printing, alarm output, alarm acknowledgement, upscale check, and security functions. This ATP test is to be performed after completion of the 105KE ARMS installation. The alarm outputs of the 105KE ARMS will be connected to the basin detector alarms, basin annunciator system, and security Alarm Monitoring System, AMS, located in the 200 area Central Alarm Station (CAS).

  16. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    and requirements that should be considered in the regulation of decommissioning facilities for offshore installations. These facilities need sound expertise to be able to identify and deal with different types of waste, including hazardous waste such as heavy metals, other hazardous substances, low specific activity (LSA) radioactive material and asbestos. Facilities must be designed to allow safe handling of such waste, with no risk of runoff or infiltration into the soil. In addition, a decommissioning facility should have an effective collection system and an on-site treatment plant for contaminated water, including surface water. Each facility must have a sampling and analysis programme to monitor releases of the most relevant pollutants. The need for an environmental monitoring programme to follow developments in the recipient should also be considered. Other factors that must be closely monitored include noise and releases to air in connection with metal cutting and other operations. Moreover, decommissioning contracts must ensure that the costs of handling hazardous waste are met by the offshore operators. When decommissioning facilities for offshore installations are being sited, other interests must also be taken into account; for example, the use of nearby areas for housing, holiday housing or recreation. In addition, the implications for other sectors such as fisheries and agriculture must be taken into consideration. These are important issues that the municipalities must consider when preparing zoning plans and drawing up environmental impact assessments. In many cases, a regional authority is in a better position than a national one to make overall, cross-sectoral assessments of developments within the region. Nevertheless, the report recommends transferring the authority for regulating decommissioning facilities for offshore installations from the County Governors to the Climate and Pollution Agency. Regulating these facilities requires special

  17. Passive Wireless Hermetic Environment Monitoring System for Spray Painting Workshop.

    Science.gov (United States)

    Wang, Lifeng; Ma, Jingjing; Huang, Yan; Tang, Dan; Huang, Qing-An

    2016-08-01

    Passive wireless sensors have the advantages of operating without a power supply and remote sensing capability. Hence, they are very suitable for some harsh environments, such as hermetic environments, rotating parts, or very high temperature environments. The spray painting workshop is such a harsh environment, containing a large amount of flammable paint mist and organic gas. Aiming at this special environment of spray painting workshop, a passive wireless hermetic environment monitoring system was designed, fabricated, and demonstrated. The proposed system is composed of a transponder and a reader, and the circuit design of each part is given in detail in this paper. The power and the data transmission between the transponder and the reader are realized by the inductive coupling mechanism. Utilizing the back scatter modulation and channel multiplexing, the frequency signals generated by three different environmental sensors-together with their interfaces in the transponder-are wirelessly read out by the reader. Because of the harsh environment of the spray painting room, the package of the monitoring system is quite important. Three different kinds of filter films for the system package were compared. The experimental results show that the composite filter film aluminum anodic oxide/polytetrafluoroethylene (AAO/PTFE) has the best performance. After fabrication, the measured temperature, humidity, and pressure sensitivities were measured and found to be 180 Hz/°C in the range of 0~60 °C, 100 Hz/%RH in the range of 15~95 %RH, and 42 Hz/hPa in the range of 600~1100 hPa, respectively. Additionally, the remote sensing distance of the monitoring system reaches 4 cm. Finally, the passive wireless hermetic environment monitoring system was installed on the glass wall of the spray painting workshop and was successfully demonstrated.

  18. Solar heating, cooling and domestic hot water system installed at Columbia Gas System Service Corp. , Columbus, Ohio. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-01

    The Solar Energy System located at the Columbia Gas Corporation, Columbus, Ohio, has 2978 ft/sup 2/ of Honeywell single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/h Bryan water-tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton Arkla hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts are included from the site files, specification references, drawings, installation, operation and maintenance instructions.

  19. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...

  20. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...

  1. Operations Monitoring Assistant System Design

    Science.gov (United States)

    1986-07-01

    subsections address these system , tesi ~n issues in tiirn. 3.1 OMA SYSTEM OVERVIEW Figure 3-1 presents the concept in Figure 2-1 in more detail, from an OMA...issues---a local agent cannot realistically Tell -he centralized planner everything about its current situation. and must instead ,t- cide what relevant

  2. Monitoring the CMS Data Acquisition System

    CERN Document Server

    Bauer, Gerry; Biery, K; Branson, J; Cano, E; Cheung, H; Ciganek, M; Cittolin, S; Coarasa, J A; Deldicque, C; Dusinberre, E; Erhan, S; Fortes Rodrigues, F; Gigi, D; Glege, F; Gomez-Reino, R; Gutleber, J; Hatton, D; Laurens, J F; Lopez Perez, J A; Meijers, F; Meschi, E; Meyer, A; Mommsen, R; Moser, R; O'Dell, V; Oh, A; Orsini, L B; Patras, V; Paus, C; Petrucci, A; Pieri, M; Racz, A; Sakulin, H; Sani, M; Schieferdecker, P; Schwick, C; Shpakov, D; Simon, S; Sumorok, K; Zanetti, M.

    2010-01-01

    The CMS data acquisition system comprises O(20000) interdependent services that need to be monitored in near real-time. The ability to monitor a large number of distributed applications accurately and effectively is of paramount importance for robust operations. Application monitoring entails the collection of a large number of simple and composed values made available by the software components and hardware devices. A key aspect is that detection of deviations from a specified behaviour is supported in a timely manner, which is a prerequisite in order to take corrective actions efficiently. Given the size and time constraints of the CMS data acquisition system, efficient application monitoring is an interesting research problem. We propose an approach that uses the emerging paradigm of Web-service based eventing systems in combination with hierarchical data collection and load balancing. Scalability and efficiency are achieved by a decentralized architecture, splitting up data collections into regions of col...

  3. Portable system for periodical verification of area monitors for neutrons; Sistema portatil para verificacao periodica de monitores de area para neutrons

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Luciane de R.; Leite, Sandro Passos; Lopes, Ricardo Tadeu, E-mail: rluciane@ird.gov.b [Coordenacao dos Programas de Pos-Graduacao de Engenharia (PEN/COPPE/UFRJ), RJ (Brazil). Programa de Energia Nuclear; Patrao, Karla C. de Souza; Fonseca, Evaldo S. da; Pereira, Walsan W., E-mail: karla@ird.gov.b [Instituto de Radioprotecao e Dosimetria (IRD/CNEN-RJ), Rio de Janeiro, RJ (Brazil). Lab. Nacional de Metrologia das Radiacoes Ionizantes (LNMRI). Lab. de Neutrons

    2009-07-01

    The Neutrons Laboratory develops a project viewing the construction of a portable test system for verification of functioning conditions of neutron area monitors. This device will allow to the users the verification of the calibration maintenance of his instruments at the use installations, avoiding the use of an inadequate equipment related to his answer to the neutron beam response

  4. Performance comparision of a new-type trough solar concentrator thermal system in different installations

    Directory of Open Access Journals (Sweden)

    Chen Mingxian

    2015-01-01

    Full Text Available This paper puts forward a new-type trough solar concentrator with a compound surface, which is comprised of two upper paraboloids, lower planar mirrors and one base paraboloid. This structure forms a co-focus where a solar receiver is installed. The performance of the new-type trough solar concentrator combined with a cylinder receiver and a flat plate receiver, respectively, was tested. For comparison, the reflector of the concentrator was made of a polished aluminum sheet and a mirror glass, respectively. The experimental results show that the prototype concentrator systems may have an average efficiency around 40% for the hot water temperature up to 80°C and the ambient temperature below 0°C in winter. To test and verify the performance of the system in higher temperature range, a scaled-down new concentrator of the same structure was made and tested in the outdoor. It was found from the results that the designed new-type trough concentrator can produce 220°C solar heat. It indicates that the proposed design may be promising for solar thermal application at a medium temperature of 80°C -150°C.

  5. Optimal voltage control in distribution systems with coordination of distribution installations

    Energy Technology Data Exchange (ETDEWEB)

    Oshiro, Masato; Tanaka, Kenichi; Uehara, Akie; Senjyu, Tomonobu; Miyazato, Yoshitaka; Yona, Atsushi [Faculty of Engineering, University of the Ryukyus, 1 Senbaru, Nishihara-cho, Nakagami, Okinawa 903-0213 (Japan); Funabashi, Toshihisa [Meidensha Corporation, 2-1-1, Osaki, Shinagawa-ku, Tokyo 141-6029 (Japan)

    2010-12-15

    In recent years, distributed generations based on natural energy or co-generation systems are increasing due to global warming and reduction of fossil fuels. Many of the distributed generations are set up in the vicinity of customers, with the advantage that this decreases transmission losses and transmission capacity. However, output power generated from renewable energy such as wind power and photovoltaics, is influenced by weather conditions. Therefore if the distributed generation increases with conventional control schemes, the voltage variation in a distribution system becomes a serious problem. In this paper, an optimal control method of distribution voltage with coordination of distributed installations, such as On Load Tap Changer (OLTC), Step Voltage Regulator (SVR), Shunt Capacitor (SC), Shunt Reactor (ShR), and Static Var Compensator (SVC), is proposed. In this research, the communication infrastructure is assumed to be widespread in the distribution network. The proposed technique combines genetic algorithm (GA) and Tabu search (TS) to determine the control operation. In order to confirm the validity of the proposed method, simulation results are presented for a distribution network model with distributed (photovoltaic) generation. (author)

  6. System-Level Verification of Science Instruments Prior to Installation at TMT

    Science.gov (United States)

    Ebbets, Dennis; Lystrup, Makenzie

    2014-07-01

    Science instruments for TMT will share many similarities with those built for large space observatories such as HST and JWST. They will be physically large, scientifically sophisticated and technologically complex. They will represent very significant investments of time and money by PI-led teams with common scientific interests, but from many academic institutions, industry partners and even nations. These teams will verify the basic functionality and performance of their instruments, but may not each have facilities to test the many complex interfaces to and interactions with the observatory. Once installed on the telescope and commissioned, the instruments will be expected to function for many years with very limited opportunities for servicing. These and other considerations argue that a common facility that provides reasonably high fidelity simulation of the TMT mechanical and optical environments, AO system interfaces, operations and data management systems and other critical functions would enable a confidence-building final step in the Integration and Test process. This poster illustrates how high-quality Ground Support Equipment was used to prepare seven instruments for Hubble, develop and validate wave-front sensing and control algorithms for James Webb, simulate the optical characteristics of JWST, conduct vibration and modal surveys, and produce performance data that were compared with predictions of integrated models. Analogous capabilities could be developed to support TMT, ensuring delivery of fully qualified instruments to the observatory.

  7. Heart monitoring systems--a review.

    Science.gov (United States)

    Jain, Puneet Kumar; Tiwari, Anil Kumar

    2014-11-01

    To diagnose health status of the heart, heart monitoring systems use heart signals produced during each cardiac cycle. Many types of signals are acquired to analyze heart functionality and hence several heart monitoring systems such as phonocardiography, electrocardiography, photoplethysmography and seismocardiography are used in practice. Recently, focus on the at-home monitoring of the heart is increasing for long term monitoring, which minimizes risks associated with the patients diagnosed with cardiovascular diseases. It leads to increasing research interest in portable systems having features such as signal transmission capability, unobtrusiveness, and low power consumption. In this paper we intend to provide a detailed review of recent advancements of such heart monitoring systems. We introduce the heart monitoring system in five modules: (1) body sensors, (2) signal conditioning, (3) analog to digital converter (ADC) and compression, (4) wireless transmission, and (5) analysis and classification. In each module, we provide a brief introduction about the function of the module, recent developments, and their limitation and challenges.

  8. Beam-loss monitoring system with free-air ionization chambers

    Science.gov (United States)

    Nakagawa, H.; Shibata, S.; Hiramatsu, S.; Uchino, K.; Takashima, T.

    1980-08-01

    A monitoring system for proton beam losses was installed in the proton synchrotron at the National Laboratory for High Energy Physics in Japan (KEK). The system consists of 56 air ionization chambers (AIC) for radiation detectors, 56 integrators, 56 variable gain amplifiers, two multiplexers, a computer interface circuit, a manual controller and a high tension power supply. The characteristics of the AIC, time resolution, radiation measurement upper limit saturation, kinetic energy dependence of the sensitivity, chamber activation effect, the beam loss detection system and the results of observations with the monitoring system are described.

  9. Study on remote monitoring system for landslide hazard based on Wireless Sensor Network and its application

    Institute of Scientific and Technical Information of China (English)

    GUI Yang; TAO Zhi-gang; WANG Chang-jun; XIE Xing

    2011-01-01

    Based on Beidou satellite communication platform,sliding force remote monitoring and warning system was widely used in Lingbao Luoshan gold ore,which had achieved remarkable social and economical benefits.However,there is one monitoring point at every 1 000 m2,and their distribution is so discrete that it will no doubt increase construction and operation cost if every monitoring point was installed a Beidou subscriber machine.Therefore,based on Zigbee wireless sensor network technology,network structure and the nodes,embed wireless sensor node in remote monitoring and warning system,a base platform of local wireless sensor network is formed,and it can combine punctiform monitoring information with planar network and transmit concentrated information through Beidou satellite terminal machine; as a result,this largely expands the transmission distance of monitoring data.

  10. The challenge of installing a tsunami early warning system in the vicinity of the Sunda Arc, Indonesia

    Directory of Open Access Journals (Sweden)

    J. Lauterjung

    2010-04-01

    Full Text Available Indonesia is located along the most prominent active continental margin in the Indian Ocean, the so-called Sunda Arc and, therefore, is one of the most threatened regions of the world in terms of natural hazards such as earthquakes, volcanoes, and tsunamis. On 26 December 2004 the third largest earthquake ever instrumentally recorded (magnitude 9.3, Stein and Okal, 2005 occurred off-shore northern Sumatra and triggered a mega-tsunami affecting the whole Indian Ocean. Almost a quarter of a million people were killed, as the region was not prepared either in terms of early-warning or in terms of disaster response.

    In order to be able to provide, in future, a fast and reliable warning procedure for the population, Germany, immediately after the catastrophe, offered during the UN World Conference on Disaster Reduction in Kobe, Hyogo/Japan in January 2005 technical support for the development and installation of a tsunami early warning system for the Indian Ocean in addition to assistance in capacity building in particular for local communities. This offer was accepted by Indonesia but also by other countries like Sri Lanka, the Maldives and some East-African countries. Anyhow the main focus of our activities has been carried out in Indonesia as the main source of tsunami threat for the entire Indian Ocean. Challenging for the technical concept of this warning system are the extremely short warning times for Indonesia, due to its vicinity to the Sunda Arc. For this reason the German Indonesian Tsunami Early Warning System (GITEWS integrates different modern and new scientific monitoring technologies and analysis methods.

  11. RESULTS FROM A DEMONSTRATION OF RF-BASED UF6 CYLINDER ACCOUNTING AND TRACKING SYSTEM INSTALLED AT A USEC FACILITY

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, Chris A [ORNL; Kovacic, Donald N [ORNL; Morgan, Jim [Innovative Solutions; Younkin, James R [ORNL; Carrick, Bernie [USEC, Inc.; Ken, Whittle [USEC, Inc.; Johns, R E [Pacific Northwest National Laboratory (PNNL)

    2008-09-01

    Approved industry-standard cylinders are used globally for storing and transporting uranium hexafluoride (UF{sub 6}) at uranium enrichment plants and processing facilities. To verify that no diversion or undeclared production of nuclear material involving UF{sub 6} cylinders at the facility has occurred, the International Atomic Energy Agency (IAEA) conducts periodic, labor-intensive physical inspections to validate facility records, cylinder identities, and cylinder weights. A reliable cylinder monitoring system that would improve overall inspector effectiveness would be a significant improvement to the current international safeguards inspection regime. Such a system could include real-time unattended monitoring of cylinder movements, situation-specific rules-based event detection algorithms, and the capability to integrate with other types of safeguards technologies. This type of system could provide timely detection of abnormal operational activities that may be used to ensure more appropriate and efficient responses by the IAEA. A system of this type can reduce the reliance on paper records and have the additional benefit of facilitating domestic safeguards at the facilities at which it is installed. A radio-frequency (RF)-based system designed to track uranium hexafluoride (UF{sub 6}) cylinders during processing operations was designed, assembled, and tested at the United States Enrichment Corporation (USEC) facility in Portsmouth, Ohio, to determine the operational feasibility and durability of RF technology. The overall objective of the effort was to validate the robustness of RF technology for potential use as a future international safeguards tool for tracking UF6 cylinders at uranium-processing facilities. The results to date indicate that RF tags represent a feasible technique for tracking UF{sub 6} cylinders in operating facilities. Additional work will be needed to improve the operational robustness of the tags for repeated autoclave processing and to

  12. Monitoring a petabyte scale storage system

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Jon; Berman, Eileen; Huang, Chih-Hao; Moibenko, Alexander; Petravick, Don; Zalokar, Michael; /Fermilab

    2004-12-01

    Fermilab operates a petabyte scale storage system, Enstore, which is the primary data store for experiments' large data sets. The Enstore system regularly transfers greater than 15 Terabytes of data each day. It is designed using a client-server architecture providing sufficient modularity to allow easy addition and replacement of hardware and software components. Monitoring of this system is essential to insure the integrity of the data that is stored in it and to maintain the high volume access that this system supports. The monitoring of this distributed system is accomplished using a variety of tools and techniques that present information for use by a variety of roles (operator, storage system administrator, storage software developer, user). Essential elements of the system are monitored: performance, hardware, firmware, software, network, data integrity. We will present details of the deployed monitoring tools with an emphasis on the different techniques that have proved useful to each role. Experience with the monitoring tools and techniques, what worked and what did not will be presented.

  13. Corrosion Rate Monitoring in District Heating Systems

    DEFF Research Database (Denmark)

    Hilbert, Lisbeth Rischel; Nielsen, Lars Vendelbo; Andersen, A.

    2005-01-01

    Quality control in district heating systems to keep uniform corrosion rates low and localized corrosion minimal is based on water quality control. Side-stream units equipped with carbon steel probes for online monitoring were mounted in district heating plants to investigate which techniques would...... be applicable, and if on-line monitoring could improve the quality control. Water quality monitoring was applied as well as corrosion rate monitoring with linear polarization resistance (LPR), electrochemical impedance spectroscopy (EIS), electrical resistance (ER) technique, mass loss and a crevice corrosion...... cell for localized corrosion risk estimation. Important variations in corrosion rate due to changes in make-up water quality were detected with the continuous monitoring provided by ER and crevice cell, while LPR gave unreliable corrosion rates. The acquisition time of two-three days for EIS...

  14. Corrosion Rate Monitoring in District Heating Systems

    DEFF Research Database (Denmark)

    Hilbert, Lisbeth Rischel; Nielsen, Lars Vendelbo; Andersen, A.

    2005-01-01

    Quality control in district heating systems to keep uniform corrosion rates low and localized corrosion minimal is based on water quality control. Side-stream units equipped with carbon steel probes for online monitoring were mounted in district heating plants to investigate which techniques would...... be applicable, and if on-line monitoring could improve the quality control. Water quality monitoring was applied as well as corrosion rate monitoring with linear polarization resistance (LPR), electrochemical impedance spectroscopy (EIS), electrical resistance (ER) technique, mass loss and a crevice corrosion...... cell for localized corrosion risk estimation. Important variations in corrosion rate due to changes in make-up water quality were detected with the continuous monitoring provided by ER and crevice cell, while LPR gave unreliable corrosion rates. The acquisition time of two-three days for EIS...

  15. Tritium monitor and collection system

    Science.gov (United States)

    Bourne, Gary L.; Meikrantz, David H.; Ely, Walter E.; Tuggle, Dale G.; Grafwallner, Ervin G.; Wickham, Keith L.; Maltrud, Herman R.; Baker, John D.

    1992-01-01

    This system measures tritium on-line and collects tritium from a flowing inert gas stream. It separates the tritium from other non-hydrogen isotope contaminating gases, whether radioactive or not. The collecting portion of the system is constructed of various zirconium alloys called getters. These alloys adsorb tritium in any of its forms at one temperature and at a higher temperature release it as a gas. The system consists of four on-line getters and heaters, two ion chamber detectors, two collection getters, and two guard getters. When the incoming gas stream is valved through the on-line getters, 99.9% of it is adsorbed and the remainder continues to the guard getter where traces of tritium not collected earlier are adsorbed. The inert gas stream then exits the system to the decay chamber. Once the on-line getter has collected tritium for a predetermined time, it is valved off and the next on-line getter is valved on. Simultaneously, the first getter is heated and a pure helium purge is employed to carry the tritium from the getter. The tritium loaded gas stream is then routed through an ion chamber which measures the tritium activity. The ion chamber effluent passes through a collection getter that readsorbs the tritium and is removable from the system once it is loaded and is then replaced with a clean getter. Prior to removal of the collection getter, the system switches to a parallel collection getter. The effluent from the collection getter passes through a guard getter to remove traces of tritium prior to exiting the system. The tritium loaded collection getter, once removed, is analyzed by liquid scintillation techniques. The entire sequence is under computer control except for the removal and analysis of the collection getter.

  16. Investigation of methods for successful installation and operation of Juvenile Salmon Acoustic Telemetry System (JSATS) hydrophones in the Willamette River, Oregon, 2012

    Science.gov (United States)

    Rutz, Gary L.; Sholtis, Matthew D.; Adams, Noah S.; Beeman, John W.

    2014-01-01

    Acoustic telemetry equipment was installed at three sites in the Willamette River during October 2012 to test the effectiveness of using the Juvenile Salmon Acoustic Telemetry System to monitor the movements of fish in a high-flow, high-velocity riverine environment. Hydrophones installed on concrete blocks were placed on the bottom of the river, and data cables were run from the hydrophones to shore where they were attached to anchor points. Under relatively low-flow conditions (less than approximately 10,000 cubic feet per second) the monitoring system remained in place and could be used to detect tagged fish as they traveled downstream during their seaward migration. At river discharge over approximately 10,000 cubic feet per second, the hydrophones were damaged and cables were lost because of the large volume of woody debris in the river and the increase in water velocity. Damage at two of the sites was sufficient to prevent data collection. A limited amount of data was collected from the equipment at the third site. Site selection and deployment strategies were re-evaluated, and an alternate deployment methodology was designed for implementation in 2013.

  17. Valve-"Health"-Monitoring System

    Science.gov (United States)

    Jensen, Scott L.; Drouant, George J.

    2009-01-01

    A system that includes sensors and data acquisition, wireless data-communication, and data-processing subsystems has been developed as a means of both real-time and historical tracking of information indicative of deterioration in the mechanical integrity and performance of a highgeared ball valve or a linearly actuated valve that operates at a temperature between cryogenic and ambient.

  18. Diabetes Monitoring System Using Mobile Computing Technologies

    Directory of Open Access Journals (Sweden)

    Mashael Saud Bin-Sabbar

    2013-03-01

    Full Text Available Diabetes is a chronic disease that needs to regularly be monitored to keep the blood sugar levels within normal ranges. This monitoring depends on the diabetic treatment plan that is periodically reviewed by the endocrinologist. The frequent visit to the main hospital seems to be tiring and time consuming for both endocrinologist and diabetes patients. The patient may have to travel to the main city, paying a ticket and reserving a place to stay. Those expenses can be reduced by remotely monitoring the diabetes patients with the help of mobile devices. In this paper, we introduce our implementation of an integrated monitoring tool for the diabetes patients. The designed system provides a daily monitoring and monthly services. The daily monitoring includes recording the result of daily analysis and activates to be transmitted from a patient’s mobile device to a central database. The monthly services require the patient to visit a nearby care center in the patient home town to do the medical examination and checkups. The result of this visit entered into the system and then synchronized with the central database. Finally, the endocrinologist can remotely monitor the patient record and adjust the treatment plan and the insulin doses if need.

  19. Amplified OTDR systems for multipoint corrosion monitoring.

    Science.gov (United States)

    Nascimento, Jehan F; Silva, Marcionilo J; Coêlho, Isnaldo J S; Cipriano, Eliel; Martins-Filho, Joaquim F

    2012-01-01

    We present two configurations of an amplified fiber-optic-based corrosion sensor using the optical time domain reflectometry (OTDR) technique as the interrogation method. The sensor system is multipoint, self-referenced, has no moving parts and can measure the corrosion rate several kilometers away from the OTDR equipment. The first OTDR monitoring system employs a remotely pumped in-line EDFA and it is used to evaluate the increase in system reach compared to a non-amplified configuration. The other amplified monitoring system uses an EDFA in booster configuration and we perform corrosion measurements and evaluations of system sensitivity to amplifier gain variations. Our experimental results obtained under controlled laboratory conditions show the advantages of the amplified system in terms of longer system reach with better spatial resolution, and also that the corrosion measurements obtained from our system are not sensitive to 3 dB gain variations.

  20. Amplified OTDR Systems for Multipoint Corrosion Monitoring

    Directory of Open Access Journals (Sweden)

    Joaquim F. Martins-Filho

    2012-03-01

    Full Text Available We present two configurations of an amplified fiber-optic-based corrosion sensor using the optical time domain reflectometry (OTDR technique as the interrogation method. The sensor system is multipoint, self-referenced, has no moving parts and can measure the corrosion rate several kilometers away from the OTDR equipment. The first OTDR monitoring system employs a remotely pumped in-line EDFA and it is used to evaluate the increase in system reach compared to a non-amplified configuration. The other amplified monitoring system uses an EDFA in booster configuration and we perform corrosion measurements and evaluations of system sensitivity to amplifier gain variations. Our experimental results obtained under controlled laboratory conditions show the advantages of the amplified system in terms of longer system reach with better spatial resolution, and also that the corrosion measurements obtained from our system are not sensitive to 3 dB gain variations.

  1. Mid-market transformation programs: programs to promote best practices in system specification and installation

    Energy Technology Data Exchange (ETDEWEB)

    Rosenberg, Mitchell [KEMA-XENERGY Inc., Arnheim (Netherlands)

    2003-07-01

    This paper summarizes the experience of programs designed to promote the adoption of best practices in equipment specification and installation among distributors and installation contractors in the residential central air conditioning and industrial compressed air equipment markets. For each of those markets, the paper identifies the current understanding of best practices, characterizes energy savings available from their adoption, assesses the nature of barriers to their adoption, and describes the operations and accomplishments of programs designed to address those barriers.

  2. Proposal for the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC. Following a market survey carried out among 53 firms in twelve Member States, a call for tenders (IT-3091/TIS/LHC) was sent on 17 July 2003 to seven firms and five consortia in eight Member States. By the closing date, CERN had received seven tenders from one firm and six consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ASSYSTEM INDUSTRIAL SERVICES (FR) - GENITRON INSTRUMENTS (DE), the lowest bidder, for the supply, installation and maintenance of radiation and environmental monitoring for the LHC for a total amount not exceeding 5 474 000 euros (8 457 000 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender. The consortium has indicated the following distribution by country of the contract value covered by this ...

  3. Incorporation of thermal inertia in the aim of installing a natural nighttime ventilation system in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Roucoult, J.-M.; Douzane, O.; Langlet, T. [Laboratoire de Batiment, Materiaux et Thermique, Universite de Picardie Jules Verne, IUT Genie Civil, F-80025 Amiens (France)

    1999-07-01

    The objective of this study is to propose a simplified characterization of thermal inertia, as part of the installation of a system of summer refreshment by means of nighttime cooling ventilation. On the basis of a previous study, conducted by relying upon a modal analysis, the interactions between the thermal inertia of a building and the variation of the air exchange rate have been explained. It can then be shown that the notion of useful thermal mass has herein been altered in order to take the thermal inertia of the building into account; it would then be suitable to substitute this notion for an approximated calculation of the building's main time constant. Moreover, the necessity of adding a parameter that characterizes the rapid dynamics of a particular zone's air temperature can be justified. Lastly, a characterization of the thermal inertia based upon the three-criteria calculation is proposed. An approximated value of the time constant both during the period of nighttime cooling and beyond this period, as well as an approximated value of the height of the line associated with the rapid dynamics, can be computed. (author)

  4. Well Monitoring System For EGS

    Energy Technology Data Exchange (ETDEWEB)

    Normann, Randy [Perma Works LLC, Pattonville, TX (United States); Glowka, Dave [Perma Works LLC, Pattonville, TX (United States); Normann, Charles [Perma Works LLC, Pattonville, TX (United States); Parker, James [Electrochemical Systems Inc, Knoxville, TN (United States); Caja, Josip [Electrochemical Systems Inc, Knoxville, TN (United States); Dustan, Don [Electrochemical Systems Inc, Knoxville, TN (United States); Caja, Mario [Electrochemical Systems Inc, Knoxville, TN (United States); Sariri, Kouros [Frequency Management Int. Inc., Huntington Beach, CA (United States); Beal, Craig [MajiQ Technologies Inc., Somerville, MA (United States)

    2017-02-26

    This grant is a collection of projects designed to move aircraft high temperature electronics technology into the geothermal industry. Randy Normann is the lead. He licensed the HT83SNL00 chip from Sandia National Labs. This chip enables aircraft developed electronics for work within a geothermal well logging tool. However, additional elements are needed to achieve commercially successful logging tools. These elements are offered by a strong list of industrial partners on this grant as: Electrochemical Systems Inc. for HT Rechargeable Batteries, Frequency Management Systems for 300C digital clock, Sandia National Labs for experts in high temperature solder, Honeywell Solid-State Electronics Center for reprogrammable high temperature memory. During the course of this project MagiQ Technologies for high temperature fiber optics.

  5. The Combat-Wireless Health Monitoring System

    Science.gov (United States)

    2009-12-01

    not monitor concussions sustained by casualties. This article proposes the develop- ment of a new C-WHMS as an alterna- tive to the WPSM. The C-WHMS...monitoring system embedded within the Advanced Combat Helmet (ACH), which measures concussions sustained during the execution of combat operations. The...component of the C-WHMS, as embedded in the ACH. Concussions sus- tained by soldiers are a major concern of military leadership. The goal is to quickly

  6. An automated neutron monitor maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

    1996-09-01

    Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector`s functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

  7. Research and Construction the Net Monitor System

    OpenAIRE

    Ruining Huang; Lei Li; Yunjiang Lou

    2012-01-01

    A Net Monitor system is presented in this paper. The system is based on STMicroelectronics board FLTK3D, which provides hardware platform for TV functions--3D film, IPTV, 3D game, cable television and so on. The whole system includes the Linux Operating System (OS), embedded web browser, Media player, clouding applications, video conference and 3D game. It utilizes the reference model of the CLFS (Cross Linux From Scratches) principle to construct the embedded Linux OS. Cloud applications are...

  8. A Research on Distributed Emergency Monitoring System

    Institute of Scientific and Technical Information of China (English)

    WANG; Kai; LI; Hang; YANG; Hong-wei; LIU; Yang; ZHANG; Liang; CHEN; Ling; XIONG; Wen-jun

    2013-01-01

    1 Introduction The distributed emergency monitoring system(DEMS),which has distributed measurement,centralized information processing features,including integrated radiation detectors,wireless transmission evaluation and presentation software module.The system uses a GM counter and NaI(Tl)spectrometer to quickly get the information of the radiation field,and transmits the information to the on-site information

  9. Monitoring and Technical Assistance Review System Notebook

    Science.gov (United States)

    Administration for Children & Families, 2008

    2008-01-01

    This notebook provides guidance on the Monitoring and Technical Assistance Review System (MTARS). The manual is intended for use by Administration on Developmental Disabilities (ADD) staff who manage MTARS and by MTARS reviewers who conduct site visit activities. The notebook is also designed to help Councils, Protection and Advocacy Systems, and…

  10. Psychometric aspects of pupil monitoring systems

    NARCIS (Netherlands)

    Glas, Cees A.W.; Geerlings, Hanneke

    2009-01-01

    Pupil monitoring systems support the teacher in tailoring teaching to the individual level of a student and in comparing the progress and results of teaching with national standards. The systems are based on the availability of an item bank calibrated using item response theory. The assessment of th

  11. Active system monitoring applied on wind turbines

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Poulsen, Niels Kjølstad; Parbo, Henrik

    2009-01-01

    A concept for active system monitoring (ASM) applied on wind turbines is presented in this paper. The concept is based on an injection of a small periodic auxiliary signal in the system. An investigation of the signature from the auxiliary input in residual (error) signals can then be applied...

  12. Radiation protection system installation for the accelerator production of tritium/low energy demonstration accelerator project (APT/LEDA)

    CERN Document Server

    Wilmarth, J E; Tomei, T L

    2000-01-01

    The APT/LEDA personnel radiation protection system installation was accomplished using a flexible, modular proven system which satisfied regulatory orders, project design criteria, operational modes, and facility requirements. The goal of providing exclusion and safe access of personnel to areas where prompt radiation in the LEDA facility is produced was achieved with the installation of a DOE-approved Personnel Access Control System (PACS). To satisfy the facility configuration design, the PACS, a major component of the overall radiation safety system, conveniently provided five independent areas of personnel access control. Because of its flexibility and adaptability the Los-Alamos Neutron- Science-Center-(LANSCE)-designed Radiation Security System (RSS) was efficiently configured to provide the desired operational modes and satisfy the APT/LEDA project design criteria. The Backbone Beam Enable (BBE) system based on the LANSCE RSS provided the accelerator beam control functions with redundant, hardwired, ta...

  13. AUTOMATIC CONTROL SYSTEM FOR HEAT PUMP EMBEDDED IN INSTALLATION FOR PASTEURIZATION AND COOLING OF MILK, part I

    Directory of Open Access Journals (Sweden)

    Sit M.L.

    2012-12-01

    Full Text Available A heat pump scheme embedded into the installation for pasteurization and cooling of milk products is developed. A scheme of gas cooler automatic control system is considered. Methods of autonomous control of heat pump gas cooler and evaporators are presented as well.

  14. 75 FR 30292 - Airworthiness Directives; AVOX Systems and B/E Aerospace Oxygen Cylinders as Installed on Various...

    Science.gov (United States)

    2010-06-01

    ...--Affected Oxygen Cylinder Serial Numbers (S/N) Cylinder manufacturer Affected S/N AVOX Systems ST82307..., 176112-115, 176177- 115, 176181-115, and 176529-97. Subject (d) Air Transport Association of America (ATA... oxygen cylinder installed in the airplane to determine the serial number. The serial number is stamped...

  15. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  16. CORROSION MONITORING IN HANFORD NUCLEAR WASTE STORAGE TANKS DESIGN AND DATA FROM 241-AN-102 MULTI-PROBE CORROSION MONITORING SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    ANDA VS; EDGEMON GL; HAGENSEN AR; BOOMER KD; CAROTHERS KG

    2009-01-08

    In 2008, a new Multi-Probe Corrosion Monitoring System (MPCMS) was installed in double-shell tank 241-AN-102 on the U.S. Department of Energy's Hanford Site in Washington State. Developmental design work included laboratory testing in simulated tank 241-AN-102 waste to evaluate metal performance for installation on the MPCMS as secondary metal reference electrodes. The MPCMS design includes coupon arrays as well as a wired probe which facilitates measurement of tank potential as well as corrosion rate using electrical resistance (ER) sensors. This paper presents the MPCMS design, field data obtained following installation of the MPCMS in tank 241-AN-102, and a comparison between laboratory potential data obtained using simulated waste and tank potential data obtained following field installation.

  17. System Reliability Analysis of Redundant Condition Monitoring Systems

    Institute of Scientific and Technical Information of China (English)

    YI Pengxing; HU Youming; YANG Shuzi; WU Bo; CUI Feng

    2006-01-01

    The development and application of new reliability models and methods are presented to analyze the system reliability of complex condition monitoring systems. The methods include a method analyzing failure modes of a type of redundant condition monitoring systems (RCMS) by invoking failure tree model, Markov modeling techniques for analyzing system reliability of RCMS, and methods for estimating Markov model parameters. Furthermore, a computing case is investigated and many conclusions upon this case are summarized. Results show that the method proposed here is practical and valuable for designing condition monitoring systems and their maintenance.

  18. Moscow State University near-Earth radiation monitoring satellite system: current status and development

    Science.gov (United States)

    Panasyuk, Mikhail

    2016-07-01

    Radiation measurements using instruments have been designed and manufacturing in the Skobeltsyn Institute of Nuclear Physics of Lomonosov Moscow State University and installed onboard different satellites,i.e. LEO -"Meteor", ISS, GPS - GLONASS, GEO - "Electro" are presented as a basis of radiation monitoring system for control of radiation condition with a goal for to decrease radiation risk of spacecraft's damage on different orbits. Development of this system including radiation measurements onboard "Lomonosov"(LEO) satellite will be presented as well together with future project of multispacecraft LEO system for radiation monitoring.

  19. Remote container monitoring and surveillance systems

    Energy Technology Data Exchange (ETDEWEB)

    Resnik, W.M.; Kadner, S.P. [Aquila Technologies Group, Inc., Albuquerque, NM (United States)

    1995-12-31

    Aquila Technologies Group is developing a monitoring and surveillance system to monitor containers of nuclear materials. The system will both visually and physically monitor the containers. The system is based on the combination of Aquila`s Gemini All-Digital Surveillance System and on Aquila`s AssetLAN{trademark} asset tracking technology. This paper discusses the Gemini Digital Surveillance system as well as AssetLAN technology. The Gemini architecture with emphasis on anti-tamper security features is also described. The importance of all-digital surveillance versus other surveillance methods is also discussed. AssetLAN{trademark} technology is described, emphasizing the ability to continually track containers (as assets) by location utilizing touch memory technology. Touch memory technology provides unique container identification, as well as the ability to store and retrieve digital information on the container. This information may relate to container maintenance, inspection schedules, and other information. Finally, this paper describes the combination of the Gemini system with AssetLAN technology, yielding a self contained, container monitoring and area/container surveillance system. Secure container fixture design considerations are discussed. Basic surveillance review functions are also discussed.

  20. Development of wireless sensor network for landslide monitoring system

    Science.gov (United States)

    Suryadi; Puranto, Prabowo; Adinanta, Hendra; Tohari, Adrin; Priambodo, Purnomo S.

    2017-05-01

    A wireless sensor network has been developed to monitor soil movement of some observed areas periodically. The system consists of four nodes and one gateway which installed on a scope area of 0.2 Km2. Each of nodehastwo types of sensor,an inclinometer and an extensometer. An inclinometer sensor is used to measure the tilt of a structure while anextensometer sensor is used to measure the displacement of soil movement. Each of nodeisalso supported by awireless communication device, a solar power supply unit, and a microcontroller unit called sensor module. In this system, there is also gateway module as a main communication system consistinga wireless communication device, power supply unit, and rain gauge to measure the rainfall intensity of the observed area. Each sensor of inclinometer and extensometer isconnected to the sensor module in wiring system but sensor module iscommunicating with gateway in a wireless system. Those four nodes are alsoconnectedeach other in a wireless system collecting the data from inclinometer and extensometer sensors. Module Gateway istransmitting the instruction code to each sensor module one by one and collecting the data from them. Gateway module is an important part to communicate with not only sensor modules but also to the server. This wireless system wasdesigned toreducethe electric consumption powered by 80 WP solar panel and 55Ah battery. This system has been implemented in Pangalengan, Bandung, which has high intensity of rainfall and it can be seen on the website.

  1. Development of Mobile Radiological Monitor

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>Mobile radiological monitor is used to detect gamma rays and neutron for personal and vehicle. It can be installed on a microbus as a mobile monitoring system. One large plastic scintillation detector is

  2. LHCb: Monitoring the DIRAC Distribution System

    CERN Multimedia

    Nandakumar, R; Santinelli, R

    2009-01-01

    DIRAC is the LHCb gateway to any computing grid infrastructure (currently supporting WLCG) and is intended to reliably run large data mining activities. The DIRAC system consists of various services (which wait to be contacted to perform actions) and agents (which carry out periodic activities) to direct jobs as required. An important part of ensuring the reliability of the infrastructure is the monitoring and logging of these DIRAC distributed systems. The monitoring is done collecting information from two sources - one is from pinging the services or by keeping track of the regular heartbeats of the agents, and the other from the analysis of the error messages generated by both agents and services and collected by the logging system. This allows us to ensure that he components are running properly and to collect useful information regarding their operations. The process status monitoring is displayed using the SLS sensor mechanism which also automatically allows one to plot various quantities and also keep ...

  3. OPTIMIZATION METHODS FOR HYDROECOLOGICAL MONITORING SYSTEMS

    Directory of Open Access Journals (Sweden)

    Inna Pivovarova

    2016-09-01

    Full Text Available The paper describes current approaches to the rational distribution of monitoring stations. A short review and the organization of the system of hydro-geological observations in different countries are presented. On the basis of real data we propose a solution to the problem of how to calculate the average area per one hydrological station, which is the main indicator of the efficiency and performance of the monitoring system in general. We conclude that a comprehensive approach to the monitoring system organization is important, because only hydrometric and hydrochemical activities coordinated in time provide possibilities needed to analyse the underline causes of the observed pollutants content dynamics in water bodies in the long term.

  4. Installation guidelines for solar heating system, single-family residence at William OBrien State Park, Stillwater, Minnesota

    Science.gov (United States)

    1980-01-01

    Installation procedures for the single family residential solar heating system at the William O'Brien State Park, Stillwater, Minnesota, are presented. The system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Installer guidelines are provided for each subsystem and includes testing and filling the system. Information is also given on the operating procedures, controls, caution requirements and routine and schedule maintenance.

  5. Monitoring SLAC High Performance UNIX Computing Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lettsome, Annette K.; /Bethune-Cookman Coll. /SLAC

    2005-12-15

    Knowledge of the effectiveness and efficiency of computers is important when working with high performance systems. The monitoring of such systems is advantageous in order to foresee possible misfortunes or system failures. Ganglia is a software system designed for high performance computing systems to retrieve specific monitoring information. An alternative storage facility for Ganglia's collected data is needed since its default storage system, the round-robin database (RRD), struggles with data integrity. The creation of a script-driven MySQL database solves this dilemma. This paper describes the process took in the creation and implementation of the MySQL database for use by Ganglia. Comparisons between data storage by both databases are made using gnuplot and Ganglia's real-time graphical user interface.

  6. Smart Sensor Network System For Environment Monitoring

    Directory of Open Access Journals (Sweden)

    Javed Ali Baloch

    2012-07-01

    Full Text Available SSN (Smart Sensor Network systems could be used to monitor buildings with modern infrastructure, plant sites with chemical pollution, horticulture, natural habitat, wastewater management and modern transport system. To sense attributes of phenomena and make decisions on the basis of the sensed value is the primary goal of such systems. In this paper a Smart Spatially aware sensor system is presented. A smart system, which could continuously monitor the network to observe the functionality and trigger, alerts to the base station if a change in the system occurs and provide feedback periodically, on demand or even continuously depending on the nature of the application. The results of the simulation trials presented in this paper exhibit the performance of a Smart Spatially Aware Sensor Networks.

  7. PAMTRAK: A system to monitor high value objects and personnel in restricted areas

    Energy Technology Data Exchange (ETDEWEB)

    Anspach, D.A. [Sandia National Labs., Albuquerque, NM (United States); Walters, B.G. [Argonne National Lab.-West, Idaho Falls, ID (United States); Anspach, J.P. [AlliedSignal Kansas City Operations, Albuquerque, NM (United States); Crain, B. Jr. [Science Applications International Corp., Aiken, SC (United States). Savannah River Site

    1996-09-01

    The US Department of Energy (DOE) uses sensitive or classified parts and material that must be protected and accounted for. The authors believe there is a need for an automated system that can help protect and monitor these parts and material. In response to this need Sandia National Laboratories (SNL) has developed a real-time personnel and material tracking system called PAMTRAK that has been installed at selected DOE facilities. PAMTRAK safeguards sensitive parts and material by tracking tags worn by personnel and by monitoring sensors attached to the parts or material. This paper describes the goals when designing PAMTRAK, the PAMTRAK system components, the current installations, and the benefits a site can expect when using PAMTRAK.

  8. Continuous Glucose Monitoring Systems: A Review

    Directory of Open Access Journals (Sweden)

    Sandeep Kumar Vashist

    2013-10-01

    Full Text Available There have been continuous advances in the field of glucose monitoring during the last four decades, which have led to the development of highly evolved blood glucose meters, non-invasive glucose monitoring (NGM devices and continuous glucose monitoring systems (CGMS. Glucose monitoring is an integral part of diabetes management, and the maintenance of physiological blood glucose concentration is the only way for a diabetic to avoid life-threatening diabetic complications. CGMS have led to tremendous improvements in diabetic management, as shown by the significant lowering of glycated hemoglobin (HbA1c in adults with type I diabetes. Most of the CGMS have been minimally-invasive, although the more recent ones are based on NGM techniques. This manuscript reviews the advances in CGMS for diabetes management along with the future prospects and the challenges involved.

  9. A dose monitoring system for dental radiography

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chena; Lee, Sam Sun; Kim, Jo Eun; Huh, Kyung Hoe; Yi, Woo Jin; Heo, Min Suk; Choi, Soon Chul [Dept. of Oral and Maxillofacial Radiology and Dental Research Institute, School of Dentistry, Seoul National University, Seoul (Korea, Republic of); Symkhampha, Khanthaly [Dept. of Oral and Maxillofacial Radiology, Department of Basic Science, Faculty of Dentistry, University of Health Sciences, Vientiane (Lao People' s Democratic Republic); Lee, Woo Jin [Dept. of Interdisciplinary Program in Radiation, Applied Life Sciences Major, College of Medicine, BK21, and Dental Research Institute, Seoul National University, Seoul (Korea, Republic of); Yeom, Heon Young [School of Computer Science Engineering, Seoul National University, Seoul (Korea, Republic of)

    2016-06-15

    The current study investigates the feasibility of a platform for a nationwide dose monitoring system for dental radiography. The essential elements for an unerring system are also assessed. An intraoral radiographic machine with 14 X-ray generators and five sensors, 45 panoramic radiographic machines, and 23 cone-beam computed tomography (CBCT) models used in Korean dental clinics were surveyed to investigate the type of dose report. A main server for storing the dose data from each radiographic machine was prepared. The dose report transfer pathways from the radiographic machine to the main sever were constructed. An effective dose calculation method was created based on the machine specifications and the exposure parameters of three intraoral radiographic machines, five panoramic radiographic machines, and four CBCTs. A viewing system was developed for both dentists and patients to view the calculated effective dose. Each procedure and the main server were integrated into one system. The dose data from each type of radiographic machine was successfully transferred to the main server and converted into an effective dose. The effective dose stored in the main server is automatically connected to a viewing program for dentist and patient access. A patient radiation dose monitoring system is feasible for dental clinics. Future research in cooperation with clinicians, industry, and radiologists is needed to ensure format convertibility for an efficient dose monitoring system to monitor unexpected radiation dose.

  10. InterTechnology Corporation report of solar energy systems installation costs for selected commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-12-01

    The results of a study in which the primary objective was to determine actual costs associated with the installation of solar collector and thermal energy storage subsystems in specific non-residential building applications are presented. A secondary objective of the study was to assemble details of existing solar collector and storage subsystem installations, including caveats concerning cost estimating, logistics and installation practices. The study began with the development of an exhaustive listing and compilation of basic data and contacts for non-residential applications of solar heating and cooling of buildings. Both existing projects and those under construction were surveyed. Survey summary sheets for each project encountered are provided as a separate appendix. Subsequently, the rationale used to select the projects studied in-depth is presented. The results of each of the detailed studies are then provided along with survey summary sheets for each of the projects studied. Installation cost data are summarized and the significance of the differences and similarities between the reported projects is discussed. After evaluating the data obtained from the detailed studies, methods for reducing installation labor costs are postulated based on the experience of the study. Some of the methods include modularization of collectors, preplumbing and preinsulating, and collector placement procedures. Methods of cost reduction and a summary discussion of prominent problems encountered in the projects are considered.(WHK)

  11. Design of Wind Turbine Vibration Monitoring System

    Directory of Open Access Journals (Sweden)

    Shoubin Wang

    2013-04-01

    Full Text Available In order to ensure safety of wind turbine operation and to reduce the occurrence of faults as well as to improve the reliability of wind turbine operation, a vibration monitoring for wind turbine is developed. In this paper, it analyses the enlargement of all the parts of the structure and the working mechanism, the research method of wind turbine operation vibration is introduced, with the focus being the use of the sensor principle. Finally the hardware design and software of this system is introduced and the main function of this system is described, which realizes condition monitoring of the work state of wind turbines.

  12. Wearable impedance monitoring system for dialysis patients.

    Science.gov (United States)

    Bonnet, S; Bourgerette, A; Gharbi, S; Rubeck, C; Arkouche, W; Massot, B; McAdams, E; Montalibet, A; Jallon, P

    2016-08-01

    This paper describes the development and the validation of a prototype wearable miniaturized impedance monitoring system for remote monitoring in home-based dialysis patients. This device is intended to assess the hydration status of dialysis patients using calf impedance measurements. The system is based on the low-power AD8302 component. The impedance calibration procedure is described together with the Cole parameter estimation and the hydric volume estimation. Results are given on a test cell to validate the design and on preliminary calf measurements showing Cole parameter variations during hemodialysis.

  13. Condition monitoring of rotor blades of modern wind power systems; Ueberwachung mit Hertz. Condition Monitoring von Rotorblaettern moderner Windenergieanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Fecht, Nikolaus

    2010-06-15

    With seven wind turbines, the Austrian wind farm ''Sternwald'' is the biggest wind farm in Upper Austria. It is the only wind farm in a forest, and all turbines are therefore equipped with automatic fire fighting equipment. The mountain range on which the wind farm is located is about 1000 m high, with strong wind and much ice and snow in the winter season. For this reason, the owner decided to instal a condition monitoring system with ice detectors. The piezoelectric sensors are mounted directly on the rotor blades as measurements on the nacelle will always be incorrect. Installation on the rotor blades, on the other hand, makes high demands on the fastenings and sensors as the velocity of the blade tips may be up to 250 km per hour. (orig.)

  14. National Satellite Forest Monitoring systems for REDD+

    Science.gov (United States)

    Jonckheere, I. G.

    2012-12-01

    Reducing Emissions from Deforestation and Forest Degradation (REDD) is an effort to create a financial value for the carbon stored in forests, offering incentives for developing countries to reduce emissions from forested lands and invest in low-carbon paths to sustainable development. "REDD+" goes beyond deforestation and forest degradation, and includes the role of conservation, sustainable management of forests and enhancement of forest carbon stocks. In the framework of getting countries ready for REDD+, the UN-REDD Programme assists developing countries to prepare and implement national REDD+ strategies. For the monitoring, reporting and verification, FAO supports the countries to develop national satellite forest monitoring systems that allow for credible measurement, reporting and verification (MRV) of REDD+ activities. These are among the most critical elements for the successful implementation of any REDD+ mechanism. The UN-REDD Programme through a joint effort of FAO and Brazil's National Space Agency, INPE, is supporting countries to develop cost- effective, robust and compatible national monitoring and MRV systems, providing tools, methodologies, training and knowledge sharing that help countries to strengthen their technical and institutional capacity for effective MRV systems. To develop strong nationally-owned forest monitoring systems, technical and institutional capacity building is key. The UN-REDD Programme, through FAO, has taken on intensive training together with INPE, and has provided technical help and assistance for in-country training and implementation for national satellite forest monitoring. The goal of the support to UN-REDD pilot countries in this capacity building effort is the training of technical forest people and IT persons from interested REDD+ countries, and to set- up the national satellite forest monitoring systems. The Brazilian forest monitoring system, TerraAmazon, which is used as a basis for this initiative, allows

  15. Decision Fusion System for Bolted Joint Monitoring

    Directory of Open Access Journals (Sweden)

    Dong Liang

    2015-01-01

    Full Text Available Bolted joint is widely used in mechanical and architectural structures, such as machine tools, industrial robots, transport machines, power plants, aviation stiffened plate, bridges, and steel towers. The bolt loosening induced by flight load and environment factor can cause joint failure leading to a disastrous accident. Hence, structural health monitoring is critical for the bolted joint detection. In order to realize a real-time and convenient monitoring and satisfy the requirement of advanced maintenance of the structure, this paper proposes an intelligent bolted joint failure monitoring approach using a developed decision fusion system integrated with Lamb wave propagation based actuator-sensor monitoring method. Firstly, the basic knowledge of decision fusion and classifier selection techniques is briefly introduced. Then, a developed decision fusion system is presented. Finally, three fusion algorithms, which consist of majority voting, Bayesian belief, and multiagent method, are adopted for comparison in a real-world monitoring experiment for the large aviation aluminum plate. Based on the results shown in the experiment, a big potential in real-time application is presented that the method can accurately and rapidly identify the bolt loosening by analyzing the acquired strain signal using proposed decision fusion system.

  16. Application of vacuum steam systems to hot water district heating and cooling systems; Phase 2, System design and installation: Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-01-01

    Pequod Associates, Inc. and District Energy St. Paul, Inc. installed a pilot project of an innovative District Heating technology through a contract with the US Department of Energy: Application of Vacuum Steam Systems to Hot Water District Heating and Cooling Systems FG01-88CE26560. This applied research was funded by the Energy Research and Development Act (94-163) for District Heating and Cooling Research. The Department of Energy recognizes the importance of developing low-cost conversion techniques for hot water district heating systems. The experimental design is an intervention technique that permits hot water district heating systems to connect to buildings equipped with steam heating systems. This method can substantially reduce conversion cost in many older buildings. The method circulates moist hot air as a heating medium under atmospheric and vacuum conditions in standard steam radiators and steam heating coils. The system operates with heat exchangers and blower/receiver package. The pilot project involved the installation of such a system in an office building located at 310 Cedar Street, St. Paul, Minnesota. The installation enabled District Energy to provide service to a building that otherwise could not be converted to district heating without major system renovations. If the operating results of the pilot project are favorable, the technology cab be adopted by many district heating systems to lower conversion costs and increase market penetration. Among the additional benefits from this technology are eliminating old, inefficient boilers, lower maintenance costs and improved fuel efficiency.

  17. Study of installed and life-cycle costs for batteries in photovoltaic power systems

    Science.gov (United States)

    1982-10-01

    The overall objective was to estimate the installed and life-cycle costs of 9 battery technologies in a range of photovoltaic application types and sizes. For each battery type is given is a description of the battery technology, the battery factory price analysis, and the installed and life-cycle cost estimates for the battery in each of the applications evaluated. Battery types include: conventional lead-acid; sealed lead-acid; redox; zinc-bromine batteries of two types; zinc chloride; iron redox; lithium-metal sulfide; and sodium-sulfur. Applications include: shopping center; high school; multiple residence; hotel-motel; remote residence; and single residence.

  18. Wireless remote monitoring system for sleep apnea

    Science.gov (United States)

    Oh, Sechang; Kwon, Hyeokjun; Varadan, Vijay K.

    2011-04-01

    Sleep plays the important role of rejuvenating the body, especially the central nervous system. However, more than thirty million people suffer from sleep disorders and sleep deprivation. That can cause serious health consequences by increasing the risk of hypertension, diabetes, heart attack and so on. Apart from the physical health risk, sleep disorders can lead to social problems when sleep disorders are not diagnosed and treated. Currently, sleep disorders are diagnosed through sleep study in a sleep laboratory overnight. This involves large expenses in addition to the inconvenience of overnight hospitalization and disruption of daily life activities. Although some systems provide home based diagnosis, most of systems record the sleep data in a memory card, the patient has to face the inconvenience of sending the memory card to a doctor for diagnosis. To solve the problem, we propose a wireless sensor system for sleep apnea, which enables remote monitoring while the patient is at home. The system has 5 channels to measure ECG, Nasal airflow, body position, abdominal/chest efforts and oxygen saturation. A wireless transmitter unit transmits signals with Zigbee and a receiver unit which has two RF modules, Zigbee and Wi-Fi, receives signals from the transmitter unit and retransmits signals to the remote monitoring system with Zigbee and Wi-Fi, respectively. By using both Zigbee and Wi-Fi, the wireless sensor system can achieve a low power consumption and wide range coverage. The system's features are presented, as well as continuous monitoring results of vital signals.

  19. Characterization of Site for Installing Open Loop Ground Source Heat Pump System

    Science.gov (United States)

    Yun, S. W.; Park, Y.; Lee, J. Y.; Yi, M. J.; Cha, J. H.

    2014-12-01

    This study was conducted to understand hydrogeological properties of site where open loop ground source heat pump system will be installed and operated. Groundwater level and water temperature were hourly measured at the well developed for usage of open loop ground source heat pump system from 11 October 2013 to 8 January 2014. Groundwater was sampled in January and August 2013 and its chemical and isotopic compositions were analyzed. The bedrock of study area is the Jurassic granodiorite that mainly consists of quartz (27.9 to 46.8%), plagioclase (26.0 to 45.5%), and alkali feldspar (9.5 to 18.7%). The groundwater level ranged from 68.30 to 68.94 m (above mean sea level). Recharge rate was estimated using modified watertable fluctuation method and the recharge ratios was 9.1%. The water temperature ranged from 14.8 to 15.0oC. The vertical Increase rates of water temperature were 1.91 to 1.94/100 m. The water temperature showed the significant seasonal variation above 50 m depth, but had constant value below 50 m depth. Therefore, heat energy of the groundwater can be used securely in open loop ground source heat pump system. Electrical conductivity ranged from 120 to 320 µS/cm in dry season and from 133 to 310 µS/cm in wet season. The electrical conductivity gradually decreased with depth. In particular, electrical conductivity in approximately 30 m depth decreased dramatically (287 to 249 µS/cm) in wet season. The groundwater was Ca-HCO3 type. The concentrations of dissolved components did not show the vertically significant variations from 0 to 250 m depth. The δ18O and δD ranged from -9.5 to -9.4‰ and from -69 to -68‰. This work is supported by the New and Renewable Energy of the Korea Institute of Energy Technology Evaluation and Planning (KETEP) grant funded by the Korea government Ministry of Knowledge Economy (No.20123040110010).

  20. DIADEM: a system for collaborative environmental monitoring

    NARCIS (Netherlands)

    Winterboer, A.; Martens, M.A.; Pavlin, G.; Groen, F.C.A.; Evers, V.

    2011-01-01

    Environmental monitoring and emergency response projects in urban-industrial areas increasingly rely on efficient collaboration between experts in control rooms and at incident locations, and citizens who live or work in the area. In the video accompanying this abstract we present a system that uses

  1. A hand-hygiene behaviour monitoring system

    NARCIS (Netherlands)

    Van Schie, M.; Wiesman, R.F.F.

    2008-01-01

    The invention relates to a hand-hygiene behaviour monitoring system, comprising: means for detecting the occurrence of an event specified in a hand-hygiene rule, wherein the event involves a person; means for updating behaviour data that is related to acts according to the hand-hygiene rule, wherein

  2. Energy monitoring and control Systems - which one

    Energy Technology Data Exchange (ETDEWEB)

    Agase, H.D.

    1980-01-01

    Considering the high cost and general limitations of energy supplies, there is no better source of energy than simple conservation. It is the cheapest, the safest and the most productive alternative available today. This overview of Energy Monitoring and Control System types, and what to consider in their selection, will relate to conservation and significant dollar savings potential to the user.

  3. Mobile Patient Monitoring: The Mobihealth System

    NARCIS (Netherlands)

    Halteren, van Aart; Bults, Richard; Wac, Katarzyna; Konstantas, Dimitri; Widya, Ing; Dokovski, Nikolay; Koprinkov, George; Jones, Val; Herzog, Rainer

    2004-01-01

    The forthcoming wide availability of high bandwidth public wireless networks will give rise to new mobile healthcare services. To this end, the MobiHealth project has developed and trialed a highly customisable vital signs monitoring system based on a body area network (BAN) and a mobile-health (m-h

  4. Locomotive monitoring system using wireless sensor networks

    CSIR Research Space (South Africa)

    Croucamp, PL

    2014-07-01

    Full Text Available Theft of cables used for powering a locomotive not only stops the train from functioning but also paralyzes the signalling and monitoring system. This means that information on certain locomotive's cannot be passed onto other locomotives which may...

  5. Permanent cathodic protection monitoring systems for offshore pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Britton, Jim [Deepwater Corrosion Services Inc., Houston, TX (United States)

    2009-07-01

    Historically offshore pipeline cathodic protection monitoring has relied on the use of portable survey techniques. This has typically relied on ROV assisted or surface deployed survey methods. These methods have been shown to have technical as well as economic shortcomings, this is particularly true of buried offshore pipelines where accuracy is always questionable. As more focus is being placed on offshore pipeline integrity, it was time for a new method to emerge. The technology discussed involves the retro-placement of permanent clamp-on monitors onto the pipeline which can measure pipeline to seawater potential as well as current density. The sensors can be interrogated locally using light powered subsea voltage readouts. Application of the technology can be either during pipeline construction, during installation of life extension CP systems, or during routine subsea pipeline interventions. The new method eliminates the need for long cables or expensive acoustic or modulated data transfer and provides all the information required to fully verify CP system performance, thus eliminating the need for expensive close-interval surveys. Some deployment case histories will be presented along with feasibility of application on deep water pipelines and comparative economics. (author)

  6. 21 CFR 876.1725 - Gastrointestinal motility monitoring system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Gastrointestinal motility monitoring system. 876... Gastrointestinal motility monitoring system. (a) Identification. A gastrointestinal motility monitoring system is a... esophageal motility monitor and tube, the gastrointestinal motility (electrical) system, and...

  7. The drift velocity monitoring system of the CMS barrel muon chambers

    CERN Document Server

    Altenhoefer, Georg Friedrich; Heidemann, Carsten Andreas; Reithler, Hans; Sonnenschein, Lars; Teyssier, Daniel Francois

    2017-01-01

    The drift velocity is a key parameter of drift chambers. Its value depends on several parameters: electric field, pressure, temperature, gas mixture, and contamination, for example, by ambient air. A dedicated Velocity Drift Chamber (VDC) with 1-L volume has been built at the III. Phys. Institute A, RWTH Aachen, in order to monitor the drift velocity of all CMS barrel muon Drift Tube chambers. A system of six VDCs was installed at CMS and has been running since January 2011. We present the VDC monitoring system, its principle of operation, and measurements performed.

  8. Real-time health monitoring of civil infrastructure systems in Colombia

    Science.gov (United States)

    Thomson, Peter; Marulanda Casas, Johannio; Marulanda Arbelaez, Johannio; Caicedo, Juan

    2001-08-01

    Colombia's topography, climatic conditions, intense seismic activity and acute social problems place high demands on the nations deteriorating civil infrastructure. Resources that are available for maintenance of the road and railway networks are often misdirected and actual inspection methods are limited to a visual examination. New techniques for inspection and evaluation of safety and serviceability of civil infrastructure, especially bridges, must be developed. Two cases of civil structures with health monitoring systems in Colombia are presented in this paper. Construction of the Pereria-Dos Quebradas Viaduct was completed in 1997 with a total cost of 58 million dollars, including 1.5 million dollars in health monitoring instrumentation provided and installed by foreign companies. This health monitoring system is not yet fully operational due to the lack of training of national personnel in system operation and extremely limited technical documentation. In contrast to the Pereria-Dos Quebradas Viaduct monitoring system, the authors have proposed a relatively low cost health monitoring system via telemetry. This system has been implemented for real-time monitoring of accelerations of El Hormiguero Bridge spanning the Cauca River using the Colombian Southwest Earthquake Observatory telemetry systems. This two span metallic bridge, located along a critical road between the cities of Puerto Tejada and Cali in the Cauca Valley, was constructed approximately 50 years ago. Experiences with this system demonstrate how effective low cost systems can be used to remotely monitor the structural integrity of deteriorating structures that are continuously subject to high loading conditions.

  9. Monitoring and data analysis for the Vadose Zone Monitoring System (VZMS), McClellan AFB. Quarterly status report

    Energy Technology Data Exchange (ETDEWEB)

    Zawislanski, P.T.; Salve, R.; Freifeld, B. [and others

    1997-05-28

    This report contains information on field and laboratory work performed between January and May 15th 1997 at site S-7 in IC 34, at McClellan AFB. At this location, a Vadose Zone Monitoring System (VZMS) is currently being used to collect subsurface data including hydraulic potential, soil gas pressure, moisture content, water chemistry, gas chemistry, and temperature. Due to delays in the completion of the above-ground installations, data collection did not commence until mid-February. As a result, the data presented in this report is preliminary.

  10. ATLAS Tile calorimeter calibration and monitoring systems

    CERN Document Server

    Cortes-Gonzalez, Arely; The ATLAS collaboration

    2017-01-01

    The ATLAS Tile Calorimeter is the central section of the hadronic calorimeter of the ATLAS experiment and provides important information for reconstruction of hadrons, jets, hadronic decays of tau leptons and missing transverse energy. This sampling calorimeter uses steel plates as absorber and scintillating tiles as active medium. The light produced by the passage of charged particles is transmitted by wavelength shifting fibres to photomultiplier tubes, located in the outer part of the calorimeter. The readout is segmented into about 5000 cells (longitudinally and transversally), each of them being read out by two photomultiplier in parallel. To calibrate and monitor the stability and performance of each part of the readout chain during the data taking, a set of calibration systems is used. The calibration system comprises Cesium radioactive sources, laser, charge injection elements and an integrator based readout system. Combined information from all systems allows to monitor and equalise the calorimeter r...

  11. Optimising corrosion monitoring in district heating systems

    DEFF Research Database (Denmark)

    Hilbert, Lisbeth Rischel; Thorarinsdottir, R.I.; Andersen, A.

    2002-01-01

    is to improve the quality control in district heating systems by corrosion monitoring. In Danish systems electrochemical impedance spectroscopy (EIS), linear polarisation resistance (LPR), high-sensitive electrical resistance (ER) technology, crevice corrosion probes, as well as weight loss coupons......A three-year project - financially supported by the Nordic Industrial Fund - on monitoring of corrosion in district heating systems has been initiated with participation of researchers and industrial partners in Denmark, Finland, Iceland, Norway and Sweden. The primary objective of the project...... will be tested. Laboratory studies as well as on-line measurements in district heating systems using probes in a specially designed sidestream unit are included in the practical part of the project....

  12. GATEWAY Demonstrations: Philadelphia International Airport Apron Lighting: LED System Performance in a Trial Installation

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilkerson, Andrea M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-10-30

    This report documents a trial installation of LED apron lighting that replaced the existing high-pressure sodium luminaires at Philadelphia International Airport. Such high-mast applications remain challenging for LED technology, and the lessons learned from this project may help facility managers and LED product manufacturers better meet those challenges.

  13. Proposal for the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (NL) â?" SEMER (FR), the lowest bidder, for the supply, installation, commissioning and maintenance for five years of the LHC access safety system for a total amount of 891 423 euros (1 367 633 Swiss francs), subject to revision for inflation for the maintenance of the system from 1 January 2007, with an option for the supply of safety PLCs for a total amount of 894 951 euros (1 373 046 Swiss francs), not subject to revision, bringing the total amount to 1 786 374 euros (2 740 679 CHF).The rate of exchange used is that stipulated in the tender.

  14. Design of a geothermal monitoring network in a coastal area and the evaluation system

    Science.gov (United States)

    Ohan Shim, Byoung; Lee, Chulwoo; Park, Chanhee

    2016-04-01

    In Seockmodo Island (area of 48.2 km2) located at the northwest of South Korea, a renewable energy development project to install photovoltaic 136 kW and geothermal 516.3 kW is initiated. Since the 1990s, more than 20 deep geothermal wells for hot springs, greenhouse and aquaculture have been developed along coastal areas. The outflow water of each site has the pumping capacity between 300 and 4,800 m3/day with the salinity higher than 20,000 mg/l, and the maximum temperature shows 70 ?C. Because of the required additional well drillings, the increased discharge rate can cause serious seawater intrusion into freshwater aquifers, which supply groundwater for drinking and living purposes from 210 wells. In order to manage the situation, advanced management skills are required to maintain the balance between geothermal energy development and water resources protection. We designed real-time monitoring networks with monitoring stations for the sustainable monitoring of the temperature and salinity. Construction of borehole temperature monitoring for deep and shallow aquifer consists with the installation of automated temperature logging system and cellular telemetry for real-time data acquisition. The DTS (distributed temperature sensing) system and fiber optic cables will be installed for the logging system, which has enough temperature resolution and accuracy. The spatial distribution and the monitoring points can be determined by geological and hydrological situations associated with the locations of current use and planned facilities. The evaluation of the temperature and salinity variation will be conducted by the web-based monitoring system. The evaluation system will be helpful to manage the balance between the hot water development and the fresh water resources conservation.

  15. Condition Indicators for Gearbox Condition Monitoring Systems

    OpenAIRE

    P. Večeř; M. Kreidl; R. Šmíd

    2005-01-01

    Condition monitoring systems for manual transmissions based on vibration diagnostics are widely applied in industry. The systems deal with various condition indicators, most of which are focused on a specific type of gearbox fault. Frequently used condition indicators (CIs) are described in this paper. The ability of a selected condition indicator to describe the degree of gearing wear was tested using vibration signals acquired during durability testing of manual transmission with helical ge...

  16. Condition Indicators for Gearbox Condition Monitoring Systems

    Directory of Open Access Journals (Sweden)

    P. Večeř

    2005-01-01

    Full Text Available Condition monitoring systems for manual transmissions based on vibration diagnostics are widely applied in industry. The systems deal with various condition indicators, most of which are focused on a specific type of gearbox fault. Frequently used condition indicators (CIs are described in this paper. The ability of a selected condition indicator to describe the degree of gearing wear was tested using vibration signals acquired during durability testing of manual transmission with helical gears. 

  17. IMPLEMENTATION PAPER ON REAL ESTATE MONITORING SYSTEM

    OpenAIRE

    Sunidhi Kabra*, Vivek Mishra, Kshitiz Kesharwani, Shivaanshu Nagarkar

    2016-01-01

    With the enhancements in the Internet and computer technology, we are now able to do most of our work automatically, for example, e-wallet, online payments, etc. As a whole, Internet has made our lives simpler. Making use of modern day Internet and computer technologies, we have come up with an online system useful in the field of construction. Our concept, Real Estate Monitoring System, enables any individual constructor to automate the manual logs maintained at a construction site. By this ...

  18. Integrated monitoring technologies for the management of a Soil-Aquifer-Treatment (SAT) system

    Science.gov (United States)

    Kallioras, Andreas; Kofakis, Petros; Bumberger, Jan; Athanasiou, Georgios; Schimdt, Felix; Apostolopoulos, Georgios; Uzunoglou, Nikolaos; Dietrich, Peter; Schuth, Christoph

    2015-04-01

    Artificial recharge of groundwater has an important role to play in water reuse as treated wastewater effluent can be infiltrated into the ground for aquifer recharge. As the effluent moves through the soil and the aquifer, it undergoes significant quality improvements through physical, chemical, and biological processes in the underground environment. Collectively, these processes and the water quality improvement obtained are called soil-aquifer-treatment (SAT) or geopurification. The pilot site of Lavrion Technological & Cultural Park (LTCP) of the National Technical University of Athens (NTUA), involves the employment of plot infiltration basins at experimental scale, which will be using waters of impaired quality as a recharge source, and hence acting as a Soil-Aquifer-Treatment, SAT, system. Τhe LTCP site will be employed as a pilot SAT system complemented by new technological developments, which will be providing continuous monitoring of the quantitative and qualitative characteristics of infiltrating groundwater through all hydrologic zones (i.e. surface, unsaturated and saturated zone). This will be achieved by the development and installation of an integrated system of prototype sensing technologies, installed on-site, and offering a continuous evaluation of the performance of the SAT system. An integrated approach of the performance evaluation of any operating SAT system should aim at parallel monitoring of all hydrologic zones, proving the sustainability of all involved water quality treatment processes within unsaturated and saturated zone. Hence a prototype system of Time and Frequency Domain Reflectometry (TDR & FDR) sensors is developed and will be installed, in order to achieve continuous quantitative monitoring of the unsaturated zone through the entire soil column down to significant depths below the SAT basin. Additionally, the system contains two different radar-based sensing systems that will be offering (i) identification of preferential

  19. Portable RF-Sensor System for the Monitoring of Air Pollution and Water Contamination

    Directory of Open Access Journals (Sweden)

    Joonhee Kang

    2012-01-01

    Full Text Available Monitoring air pollution including the contents of VOC, O3, NO2, and dusts has attracted a lot of interest in addition to the monitoring of water contamination because it affects directly to the quality of living conditions. Most of the current air pollution monitoring stations use the expensive and bulky instruments and are only installed in the very limited area. To bring the information of the air and water quality to the public in real time, it is important to construct portable monitoring systems and distribute them close to our everyday living places. In this work, we have constructed a low-cost portable RF sensor system by using 400 MHz transceiver to achieve this goal. Accuracy of the measurement was comparable to the ones used in the expensive and bulky commercial air pollution forecast systems.

  20. Advanced Risk Management and Monitoring System, ARMMS

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kil Yoo; Han, Sang Hoon; Lim, Ho Gon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2011-10-15

    Many risk informed regulation and applications (RIR and A) are approved and used for the nuclear power plants(NPPs), and more RIR and A will be actively applied in Korea. Also, since Korean NPPs are recently exported to other country such as UAE, RIR and A would be applied to the exported NPPs. Thus, a tool which will help the user apply RIR and A is required. KAERI is being developing a tool, called ARMMS (Advanced Risk Management and Monitoring System), for this purpose. The design plan of ARMMS was introduced in the Ref, and in this paper, the actual implementation of ARMMS is introduced, and the performance monitoring module is introduced