WorldWideScience

Sample records for monitoring system installation

  1. System performance of a three-phase PV-grid-connected system installed in Thailand. Data monitored analysis

    International Nuclear Information System (INIS)

    Boonmee, Chaiyant; Watjanatepin, Napat; Plangklang, Boonyang

    2009-01-01

    PV-grid-connected systems are worldwide installed because it allows consumer to reduce energy consumption from the electricity grid and to feed the surplus energy back into the grid. The system needs no battery so therefore the system price is very cheap comparing to other PV systems. PV-grid-connected systems are used in buildings that already hooked up to the electrical grid. Finding efficiency of the PV-grid-connected system can be done by using a standard instrument which needs to disconnect the PV arrays from the grid before measurement. The measurement is also difficult and we lose energy during the measurement. This paper will present the system performance of a PV-grid-connected system installed in Thailand by using a monitoring system. The monitored data are installed by acquisition software into a computer. Analysis of monitored data will be done to find out the system performance without disconnecting the PV arrays from the system. The monitored data include solar radiation, PV voltage, PV current, and PV power which has been recorded from a 5 kWp system installed of amorphous silicon PV at Rajamangala University of Technology Suvarnabhumi, Nonthaburi, Thailand. The system performance of the system by using the data monitored is compared to the standard instrument measurement. The paper will give all details about system components, monitoring system, and monitored data. The result of data analysis will be fully given. (author)

  2. Installation of a Wastewater SCADA Monitoring System at Fort Bragg, NC

    National Research Council Canada - National Science Library

    Mullaney, Joe

    2004-01-01

    .... The Wastewater SCADA Monitoring System was installed to monitor 26 remote sites. A detailed radio study of the area verified the feasibility of using radio equipment to transfer data from these sites...

  3. Installation and commissioning of instantaneous dose rate monitoring system

    CERN Document Server

    Iaydjiev, Plamen

    2018-01-01

    INRNE-Sofia was working on the installation and commissioning of new instantaneous dose rate monitoring system for the GIF++ facility at CERN. The final device, containing an 8-channels readout board was designed and tested at the CERN facility during November 2017, in an irradiation campaign supported by the AIDA-2020 TA program. The system is designed to be fully integrated in the GIF++ control system and the data measured are available to the users.

  4. Installation of the multi-packer system for the long-term monitoring of deep groundwater system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kyung Su; Bae, Dae Seok; Kim, Chun Soo; Park, Byung Yoon; Koh, Yong Kweon; Kim, Geon Young [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2002-05-01

    The groundwater system in the deep geological environment is very important to evaluate the behavior of the radionuclide migration and near-field barrier system. The multi-packer system was installed to derive the long-term change of the groundwater pressure and its quality in the several isolated monitoring zones with depth in the study sites. The monitoring zones were basically determined by the spatial distribution characteristics of the conductive fracture and their hydraulic properties. To recover the natural groundwater condition, the borehole water was purged after completing the installation. From this equipment, the in-situ data will be provided to the radionuclide migration and system development study. 2 refs., 9 figs., 3 tabs. (Author)

  5. Automated System of Diagnostic Monitoring at Bureya HPP Hydraulic Engineering Installations: a New Level of Safety

    Energy Technology Data Exchange (ETDEWEB)

    Musyurka, A. V., E-mail: musyurkaav@burges.rushydro.ru [Bureya HPP (a JSC RusGidro affiliate) (Russian Federation)

    2016-09-15

    This article presents the design, hardware, and software solutions developed and placed in service for the automated system of diagnostic monitoring (ASDM) for hydraulic engineering installations at the Bureya HPP, and assuring a reliable process for monitoring hydraulic engineering installations. Project implementation represents a timely solution of problems addressed by the hydraulic engineering installation diagnostics section.

  6. Automated System of Diagnostic Monitoring at Bureya HPP Hydraulic Engineering Installations: a New Level of Safety

    International Nuclear Information System (INIS)

    Musyurka, A. V.

    2016-01-01

    This article presents the design, hardware, and software solutions developed and placed in service for the automated system of diagnostic monitoring (ASDM) for hydraulic engineering installations at the Bureya HPP, and assuring a reliable process for monitoring hydraulic engineering installations. Project implementation represents a timely solution of problems addressed by the hydraulic engineering installation diagnostics section.

  7. Development and installation of solution measurement and monitoring system (SMMS) at TRP

    International Nuclear Information System (INIS)

    Satoh, Takehiko; Yamanaka, Atsushi; Kashimura, Takao; Yamamoto, Tokuhiro

    2001-01-01

    The IAEA proposed TRP safeguard improvement plants in 1995 for closer and more efficient safeguards of TRP. Development of Solution Measurement and Monitoring System (SMMS) is one item of the plans and has been carried out under the JASPAS program as JA-6. Following to the IAEA's acceptance test, after the installation of the SMMS in 1999, field test of this system has been carried out. The main purpose of the SMMS is to establish the IAEA's independent monitoring system. Besides input and output accountability tanks, seven Pu storage tanks and a pot attached to the Pu storage tanks are monitored continuously, and solution level, density and temperature data of these tanks are recorded by the SMMS. Authentication of the SMMS, confirmed by the IAEA at the acceptance test, is kept by failure detection and recording functions of the system. (author)

  8. Data summary report: Southern sector monitoring well installations

    International Nuclear Information System (INIS)

    Jones, W.E.

    2000-01-01

    This report provides construction documentation for four double-screen monitoring wells installed as part of the groundwater monitoring strategy identified in the Groundwater Effectiveness Monitoring Strategy for the Proposed Southern Sector Phase I Groundwater Corrective Action (WSRC-RP-99-4114, Rev. 0, July 1999). The proposed corrective action includes In-Well Vapor Stripping Wells SSR-001 through SSR-012, designed to intercept and ameliorate the TCE and PCE plumes at the 500 parts per billion isoconcentration contour. The four monitoring wells (SSM-10, -15A, -16-, and -17) constructed during this project are designed to monitor the effectiveness of the In-Well Vapor Stripping Well system. One monitoring well (SSM-10) is located hydraulically upgradient of vapor stripping wells. The other three wells are located hydraulically downgradient of the vapor stripping wells. Four monitoring wells additional to those describe in this report will be installed for effectiveness monitoring in the future

  9. Monobuoy monitoring system - project, installation and preliminary results; Sistema de monitoracao de monoboias maritimas - desenvolvimento, instalacao e analise preliminar de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Daniel L; Machado Filho, Remo Z [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Medeiros, Junior, Adory J [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    A monobuoy monitoring system was developed and installed on 2004 in two oil terminals of TRANSPETRO. The main purpose of this system is to assure that monobuoys will be assisted during offloading operations, which will reduce the risk of accidents and detect immediately damages on mooring lines and equipment. The system comprises a Control Module on terminal site and a Remote Monitoring Unit, installed on each monobuoy. The link between modules is provided by an UHF radio-modem. The parameters acquired are pitch, roll, heave, geographic position, internal variables, and, if available, pressure and temperature of lines, traction on mooring system, etc. Positioning information is processed by the PETRONAV Positioning System. The whole process is registered and monitored on terminal with graphical interface. This article describes the development and installation of the system and the preliminary analysis of data produced since the system was installed. (author)

  10. Remote system for monitoring and control of controlled area of nuclear installation

    Energy Technology Data Exchange (ETDEWEB)

    Assuncao, Daniel Gomes de; Minhoni, Danilo Carlos Rossetto [Departamento de Ciencias da Administracao e Tecnologia. Centro Universitario de Araraquara (UNIARA) Araraquara, SP (Brazil); Farias, Marcos Sant' anna de; Santos, Isaac J.A. Luquetti dos, E-mail: luquetti@ien.gov.br [Instituto Engenharia Nuclear (IEN/CNEN-RJ), Rio Janeiro, RJ (Brazil). Divisao de Instrumentacao e Confiabilidade Humana

    2011-07-01

    The maintenance activities in controlled areas of nuclear facilities require adequate planning and control so that these activities do not cause to the worker an undue exposure to radioactivity. For maximum safety of workers from these places, there are standards that determine the maximum radiation dose that a worker can receive. From this context, the objective of this research is to develop a remote system that shows remotely the maintenance tasks being carried out in this work environment; monitors information provided by radiation monitoring devices installed at workplace; tracks the time to carry out scheduled maintenance, reporting alarm if this time is exceeded or not. The system has video camera, radiation monitoring device, interface card to transmit data via ethernet and graphical user interface, developed using the LABVIEW application. The principal objective is to improve the safety and to preserve the worker's health. (author)

  11. Remote system for monitoring and control of controlled area of nuclear installation

    International Nuclear Information System (INIS)

    Assuncao, Daniel Gomes de; Minhoni, Danilo Carlos Rossetto; Farias, Marcos Sant'anna de; Santos, Isaac J.A. Luquetti dos

    2011-01-01

    The maintenance activities in controlled areas of nuclear facilities require adequate planning and control so that these activities do not cause to the worker an undue exposure to radioactivity. For maximum safety of workers from these places, there are standards that determine the maximum radiation dose that a worker can receive. From this context, the objective of this research is to develop a remote system that shows remotely the maintenance tasks being carried out in this work environment; monitors information provided by radiation monitoring devices installed at workplace; tracks the time to carry out scheduled maintenance, reporting alarm if this time is exceeded or not. The system has video camera, radiation monitoring device, interface card to transmit data via ethernet and graphical user interface, developed using the LABVIEW application. The principal objective is to improve the safety and to preserve the worker's health. (author)

  12. Data Acquisition System On Beta Installation

    International Nuclear Information System (INIS)

    Abtokhi, Ahmad; Nurhanan; Sudarno; Sumarno, Edy

    2000-01-01

    Data acquisition system is needed on every installation. This is important used to monitoring and processing data to get information desired. This system applied to β installation which is facility to carry out experiments on accident condition like as reflooding phenomena in test section. The 16 exp.th channel data acquisition system is drived by ADC 0804 and programme application DELPHI

  13. The calibration procedure of the radiation monitoring system installed in radiation controlled area of KOMAC

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sung-Kyun; Min, Yi-Sub; Park, Jeong-Min; Cho, Yong-Sub [Korea Atomic Energy Research Institute, Gyeongju (Korea, Republic of)

    2016-10-15

    The spaces, where these accelerators are installed, are defined as the radiation controlled area and the levels of the radiation in this area are monitored by the radiation monitoring system (RMS) to protect radiation workers and experiment users from the hazards of the ionizing radiation and the surface and air contamination tests are carried out periodically by the radiation secure team. The most of RMS instruments are installed in the accelerator building, where the 100-MeV proton linear accelerator is installed. All detectors of RMS should be calibrated every year to prove the reliability of RMS and almost all instruments for RMS was calibrated during this summer maintenance period of KOMAC this year. Almost all RMS instruments installed in KOMAC is calibrated between 2016-07-13 and 2016-08-24. As the calibration result, if the current reading value are within the 5% of the reference dose rate value, this RMS instrument can be used one more year. Otherwise, the detector of that RMS instrument should be repaired or replaced. The self-calibration certificate for each RMS instrument will be published only for the instrument to satisfy the condition.

  14. Development and Testing of a Post-Installable Deepwater Monitoring System Using Fiber-Optic Sensors

    Science.gov (United States)

    Seaman, Calvin H.; Brower, David V.; Le, Suy Q.; Tang, Henry H.

    2015-01-01

    This paper addresses the design and development of a fiber-optic monitoring system that can be deployed on existing deepwater risers and flowlines; and provides a summary of test article fabrication and the subsequent laboratory testing performed at the National Aeronautics and Space Administration-Johnson Space Center (NASA-JSC). A major challenge of a post-installed instrumentation system is to ensure adequate coupling between the instruments and the riser or flowline of interest. This work investigates the sensor coupling for pipelines that are suspended in a water column (from topside platform to seabed) using a fiber-optic sensor clamp and subsea bonding adhesive. The study involved the design, fabrication, and test of several prototype clamps that contained fiber-optic sensors. A mold was produced by NASA using 3-D printing methods that allowed the casting of polyurethane clamp test articles to accommodate 4-inch and 8-inch diameter pipes. The prototype clamps were installed with a subsea adhesive in a "wet" environment and then tested in the NASA Structures Test Laboratory (STL). The tension, compression, and bending test data showed that the prototype sensor clamps achieved good structural coupling, and could provide high quality strain measurement for active monitoring.

  15. Installation and sampling of vadose zone monitoring devices

    International Nuclear Information System (INIS)

    Bergeron, S.M.; Strickland, D.J.; Pearson, R.

    1987-10-01

    A vadose zone monitoring system was installed in a sanitary landfill near the Y-12 facility on the Department of Energy's Oak Ridge, Tennessee Reservation. The work was completed as part of the LLWDDD program to develop, design, and demonstrate new low level radioactive waste disposal monitoring methods. The objective of the project was to evaluate the performance of three types of vadose zone samplers within a similar hydrogeologic environment for use as early detection monitoring devices. The three different types of samplers included the Soil Moisture Equipment Corporation Pressure-Vacuum samplers (Models 1920 and 1940), and the BAT Piezometer (Model MK II) manufactured by BAT Envitech, Inc. All three samplers are designed to remove soil moisture from the vadose (unsaturated) zone. Five clusters of three holes each were drilled to maximum depths of 45 ft around part of the periphery of the landfill. Three samplers, one of each type, were installed at each cluster location. Water samples were obtained from 13 of the 15 samplers and submitted to Martin Marietta for analysis. All three samplers performed satisfactorily when considering ease of installation, required in-hole development, and ability to collect water samples from the vadose zone. Advantages and disadvantages of each sampler type are discussed in the main report

  16. Piezometer installation and monitoring procedure: Revision 1

    International Nuclear Information System (INIS)

    1987-04-01

    The Deaf Smith County (Texas) site has been selected by the US Department of Energy as one of three candidate sites for characterization to determine its suitability as a geologic repository for high-level nuclear waste. The installation and monitoring of piezometers has been identified as one of the tasks required during the development of an underground Exploratory Shaft Facility to satisfy specific information needs through a program of in situ testing, instrumentation and monitoring. The scope of piezometer installation and monitoring encompasses the installation of fluid pressure measuring equipment and the subsequent collection, presentation and interpretation of piezometric data from strata surrounding the Exploratory Shaft Facility (ESF) prior to, during and following construction of the ESF, and as part of geohydrologic testing within the ESF. This procedure describes the required instrumentation, equipment, and sequence of activities for piezometer installation in the ESF. The procedure also includes details on the data recording and presentation requirements, personnel responsibilities, test management and quality assurance. 16 refs., 12 figs., 2 tabs

  17. Rate-based structural health monitoring using permanently installed sensors

    Science.gov (United States)

    Corcoran, Joseph

    2017-09-01

    Permanently installed sensors are becoming increasingly ubiquitous, facilitating very frequent in situ measurements and consequently improved monitoring of `trends' in the observed system behaviour. It is proposed that this newly available data may be used to provide prior warning and forecasting of critical events, particularly system failure. Numerous damage mechanisms are examples of positive feedback; they are `self-accelerating' with an increasing rate of damage towards failure. The positive feedback leads to a common time-response behaviour which may be described by an empirical relation allowing prediction of the time to criticality. This study focuses on Structural Health Monitoring of engineering components; failure times are projected well in advance of failure for fatigue, creep crack growth and volumetric creep damage experiments. The proposed methodology provides a widely applicable framework for using newly available near-continuous data from permanently installed sensors to predict time until failure in a range of application areas including engineering, geophysics and medicine.

  18. Development and Testing of a Friction-Based Post-Installable Fiber-Optic Monitoring System for Subsea Applications

    Science.gov (United States)

    Bentley, Nicole L.; Brower, David V.; Le, Suy Q.; Seaman, Calvin H.; Tang, Henry H.

    2017-01-01

    This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system capable of measuring pressure, strain, and temperature that can be deployed on existing subsea structures. A summary is provided of the design concept, prototype development, prototype performance testing, and subsequent design refinements of the device. The results of laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are also included. Limitations of the initial concept were identified during testing and future design improvements were proposed and later implemented. These new features enhance the coupling of the sensor device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on flowlines, risers, and other subsea structures. The work described in this paper investigates the design and test of a friction-based coupling device (herein referred to as a friction clamp) which is suitable for pipelines and structures that are suspended in the water column as well as for those that are resting on the seabed. The monitoring elements consist of fiberoptic sensors that are bonded to a stainless steel clamshell assembly with a high-friction surface coating. The friction clamp incorporates a single hinge design to facilitate installation of the clamp and dual rows of opposing fasteners to distribute the clamping force along the structure. The friction clamp can be modified to be installed by commercial divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating

  19. 40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?

    Science.gov (United States)

    2010-07-01

    ... monitoring the value of the operating parameters used to determine compliance with the operating limits listed in table 2 of this subpart. These devices (or methods) must measure and record the values for... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...

  20. The installation of a multiport ground-water sampling system in the 300 Area

    International Nuclear Information System (INIS)

    Gilmore, T.J.

    1989-06-01

    In 1988, the Pacific Northwest Laboratory installed a multiport groundwater sampling system in well 399-1-20, drilled north of the 300 Area on the Hanford Site in southwestern Washington State. The purpose of installing the multiport system is to evaluate methods of determining the vertical distribution of contaminants and hydraulic heads in ground water. Well 399-1-20 is adjacent to a cluster of four Resource Conservation and Recovery Act (RCRA) ground-water monitoring wells. This proximity makes it possible to compare sampling intervals and head measurements between the multiport system and the RCRA monitoring wells. Drilling and installation of the multiport system took 42 working days. Six sampling ports were installed in the upper unconfined aquifer at depths of approximately 120, 103, 86, 74, 56, and 44 feet. The locations of the sampling ports were determined by the hydrogeology of the area and the screened intervals of adjacent ground-water monitoring wells. The system was installed by backfilling sand around the sampling ports and isolating the ports with bentonite seals. The method proved adequate. For future installation, however, development and evaluation of an alternative method is recommended. In the alternative method suggested, the multiport system would be placed inside a cased and screened well, using packers to isolate the sampling zones. 4 refs., 8 figs., 1 tab

  1. Underground ventilation remote monitoring and control system

    International Nuclear Information System (INIS)

    Strever, M.T.; Wallace, K.G. Jr.; McDaniel, K.H.

    1995-01-01

    This paper presents the design and installation of an underground ventilation remote monitoring and control system at the Waste Isolation Pilot Plant. This facility is designed to demonstrate safe underground disposal of U.S. defense generated transuranic nuclear waste. To improve the operability of the ventilation system, an underground remote monitoring and control system was designed and installed. The system consists of 15 air velocity sensors and 8 differential pressure sensors strategically located throughout the underground facility providing real-time data regarding the status of the ventilation system. In addition, a control system was installed on the main underground air regulators. The regulator control system gives indication of the regulator position and can be controlled either locally or remotely. The sensor output is displayed locally and at a central surface location through the site-wide Central Monitoring System (CMS). The CMS operator can review all sensor data and can remotely operate the main underground regulators. Furthermore, the Virtual Address Extension (VAX) network allows the ventilation engineer to retrieve real-time ventilation data on his personal computer located in his workstation. This paper describes the types of sensors selected, the installation of the instrumentation, and the initial operation of the remote monitoring system

  2. Design and installation of a Prototype Geohazard Monitoring System near Machu Picchu, Peru

    Directory of Open Access Journals (Sweden)

    M. H. Bulmer

    2010-09-01

    Full Text Available The town of Machu Picchu, Peru, serves the >700 000 tourists visiting Machu Picchu annually. It has grown threefold in population in the past two decades. Due to the limited low-lying ground, construction is occurring on the unstable valley slopes. Slopes range from <10° on the valley floor to >70° in the surrounding mountains. The town has grown on a delta formed at the confluence of the Alcamayo, Aguas Calientes and Vilcanota Rivers. Geohazards in and around the town of particular concern are 1 large rocks falling onto the town and/or the rail line, 2 flash flooding by any one of its three rivers, and 3 mudflows and landslides. A prototype early warning system that could monitor weather, river flow and slope stability was installed along the Aguas Calientes River in 2009. This has a distributed modular construction allowing components to be installed, maintained, salvaged, and repaired by local technicians. A diverse set of candidate power, communication and sensor technologies was evaluated. Most of the technologies had never been deployed in similar terrain, altitude or weather. The successful deployment of the prototype proved that it is technically feasible to develop early warning capacity in the town.

  3. Environmental monitoring and information systems

    International Nuclear Information System (INIS)

    Gibbert, R.

    1998-01-01

    Environmental monitoring and information systems installed by Dornier are summarized. A broad spectrum of environmental areas from air quality and water to radioactivity is covered. Nuclear power plant monitoring systems, either as remote or plant-internal monitoring systems, form an important element of the work undertaken. The systems delivered covered local, regional or national areas. The range of services provided, and hardware and software platforms are listed. (R.P.)

  4. Hanger-type laundry monitor system

    International Nuclear Information System (INIS)

    Aoyama, Kei; Kouno, Yoshio; Yanagishima, Ryouhei; Ikeda, Yasuyuki; Nakatani, Masahiro

    1987-01-01

    Laundry monitor is installed in nuclear power plants or other nuclear facilities in order to efficiently detect radioactive contamination remains on the surfaces of the working clothes which were used in the controlled area and washed afterward. The number of the working clothes which must be measured has been increasing in accordance with the increase of the nuclear facilities. This fact and recent intensified radiation control require automatic, high-speed and high sensitive measurement. Conveyer-type laundry monitor in which the working clothes are inserted by the metal net conveyer has been generally used, and recently new system with an automatic folder has become more popular. But, this type of system has not so big capacity because the clothes are conveyed longitudinally and also requires considerable wide space when installed. Fuji electric Co., Ltd. has been engaging in research and development for an optimum laundry monitor system used in nuclear facilities since the joint investigation with ten electric power companies in Japan in 1982. Consequently hanger-type laundry monitor system using automatic hanger conveyer was developed and 2 systems were delivered to Chubu Electric Power Co., Ltd. in 1986. This system permits to detect radioactive contamination on the working clothes, pick the contaminated clothes out and fold the uncontaminated clothes fully automatically and continuously. Moreover it allows to shorten the measurement time because the clothes are conveyed transversely and save the installation space, so that this will be regarded as considerably complete system in the world. This report describes the outline of the hanger-type laundry monitor system. (author)

  5. 40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my monitor installation... Combustion Turbines Testing and Initial Compliance Requirements § 63.6125 What are my monitor installation... limitation and you are not using an oxidation catalyst, you must continuously monitor any parameters...

  6. Area monitoring intelligent system - SIMA

    International Nuclear Information System (INIS)

    Bhoem, P.; Hisas, F.; Gelardi, G.

    1990-01-01

    The area monitoring intelligent system (SIMA) is an equipment to be used in radioprotection. SIMA has the function of monitoring the radiation levels of determined areas of the installations where radioactive materials are handled. (Author) [es

  7. Towards a Real-Time Embedded System for Water Monitoring Installed in a Robotic Sailboat

    Directory of Open Access Journals (Sweden)

    Andouglas Goncalves da Silva Junior

    2016-08-01

    Full Text Available Problems related to quality (and quantity of water in natural resources or in artificial reservoirs are frequently arising and are at the center of attention of authorities and governments around the world. Many times the monitoring is not performed in an efficient time frame and a precise manner, whereas the adoption of fast and punctual solutions would undoubtedly improve the water quality and consequently enhance the life of people. To minimize or diminish such kinds of problems, we propose an architecture for sensors installed in a robotic platform, an autonomous sail boat, able to acquire raw data relative to water quality, to process and make them available to people that might be interested in such information. The main contributions are the sensors architecture itself, which uses low cost sensors, with practical experimentation done with a prototype. Results show data collected for points in lakes and rivers in the northeast of Brazil. This embedded system is fixed in the sailboat robot with the intention to facilitate the study of water quality for long endurance missions. This robot can help monitoring water bodies in a more consistent manner. Nonetheless the system can also be used with fixed vases or buoys in strategic points.

  8. Towards a Real-Time Embedded System for Water Monitoring Installed in a Robotic Sailboat.

    Science.gov (United States)

    Silva Junior, Andouglas Goncalves da; Lima Sa, Sarah Thomaz de; Santos, Davi Henrique Dos; Negreiros, Álvaro Pinto Ferrnandes de; Souza Silva, João Moreno Vilas Boas de; Álvarez Jácobo, Justo Emílio; Garcia Gonçalves, Luiz Marcos

    2016-08-08

    Problems related to quality (and quantity) of water in natural resources or in artificial reservoirs are frequently arising and are at the center of attention of authorities and governments around the world. Many times the monitoring is not performed in an efficient time frame and a precise manner, whereas the adoption of fast and punctual solutions would undoubtedly improve the water quality and consequently enhance the life of people. To minimize or diminish such kinds of problems, we propose an architecture for sensors installed in a robotic platform, an autonomous sail boat, able to acquire raw data relative to water quality, to process and make them available to people that might be interested in such information. The main contributions are the sensors architecture itself, which uses low cost sensors, with practical experimentation done with a prototype. Results show data collected for points in lakes and rivers in the northeast of Brazil. This embedded system is fixed in the sailboat robot with the intention to facilitate the study of water quality for long endurance missions. This robot can help monitoring water bodies in a more consistent manner. Nonetheless the system can also be used with fixed vases or buoys in strategic points.

  9. Design, Installation, and Monitoring of a New Downhole Heat Exchanger

    Energy Technology Data Exchange (ETDEWEB)

    Chiasson, A.D.; G.G. Culver (Geo-Heat Center, Oregon Institute of Technology, Klamath Falls, OR, USA); Favata, D. (Alternative Geothermal Solutions, Oklahoma City, OK, USA); Keiffer, S. (Facilities Services, Oregon Institute of Technology, Klamath Falls, OR, USA)

    2005-01-01

    The downhole heat exchanger (DHE) is used to provide space heating and domestic hot water from a single geothermal well. The most common construction of DHEs has been black iron, which is subject to failure by corrosion. This paper describes the design, installation, and monitoring of a new type of DHE constructed of cross-linked polyethylene plastic (PEX), a material known for its relatively high temperature and pressure rating, durability, and chemical resistance. The PEX DHE was installed as a retrofit at a residence in Klamath Falls, OR and a data logger was used to record system temperatures at 5-minute intervals for the 2004-2005 heating season. Observations thus far show the PEX assembly to be an acceptable DHE.

  10. Design, installation, and monitoring of a new downhold heat exchanger

    Energy Technology Data Exchange (ETDEWEB)

    Chiasson, A.D.; Culver, G.G.; Favata, D., Keiffer, S.

    2005-01-01

    The downhole heat exchanger (DHE) is used to provide space heating and domestic hot water from a single geothermal well. The most common construction of DHEs has been black iron, which is subject to failure by corrosion. This paper describes the design, installation, and monitoring of a new type of DHE constructed of cross-linked polyethylene plastic (PEX), a material known for its relatively high temperature and pressure rating, durability, and chemical resistance. The PEX DHE was installed as a retrofit at a residence in Klamath Falls, OR and a data logger was used to record system temperatures at 5-minute intervals for the 2004-2005 heating season. Observations thus far show the PEX assembly to be an acceptable DHE.

  11. Engineering task plan for the vapor monitor installation into 241-C-103 tank

    International Nuclear Information System (INIS)

    Hertelendy, N.A.

    1994-12-01

    A vapor flow monitor is to be installed into the 241-C-103 tank's exhaust, just downstream of the HEPA filter. The flow monitor system includes the flow sensor, the baffle assembly, the signal conditioning and control electronics, and a chart recorder. The electronics package and the chart recorder are installed into a small, heated instrument cabinet that is mounted on the same steel pallet on which the flowmeter and the diffuser assembly is mounted. The flowmeter is connected to the HEPA filter with an unheated, un-insulated flex hose. An automatic drain, upstream of the flowmeter, is designed to automatically drain the condensate into an evaporating pan. The flowmeter is heated with a temperature controlled heater to avoid condensation

  12. Radiation monitoring in a self-shielded cyclotron installation

    International Nuclear Information System (INIS)

    Capaccioli, L.; Gori, C.; Mazzocchi, S.; Spano, G.

    2002-01-01

    As nuclear medicine is approaching a new era with the spectacular growth of PET diagnosis, the number of medical cyclotrons installed within the major hospitals is increasing accordingly. Therefore modern medical cyclotron are highly engineered and highly reliable apparatus, characterised with reduced accelerating energies (as the major goal is the production of fluorine 18) and often self-shielded. However specific dedicated monitors are still necessary in order to assure the proper radioprotection. At the Careggi University Hospital in Florence a Mini trace 10 MeV self-shielded cyclotron produced by General Electric has been installed in 2000. In a contiguous radiochemistry laboratory, the preparation and quality control of 1 8F DG and other radiopharmaceuticals takes place. Aim of this work is the characterisation and the proper calibration of the above mentioned monitors and control devices

  13. Development and Testing of a Friction-Based Post-Installable Sensor for Subsea Fiber-Optic Monitoring Systems

    Science.gov (United States)

    Bentley, Nicole; Brower, David; Le, Suy Q.; Seaman, Calvin; Tang, Henry

    2017-01-01

    This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system that can be deployed on existing subsea structures. This paper provides a summary of the design concept, prototype development, prototype performance testing, and design refinements of the device. The results of the laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are included in this paper. Limitations of the initial design were identified and future design improvements were proposed. These new features will enhance the coupling of the device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based coupling devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on subsea structures, flowlines or risers. The work described in this paper investigates the design of a friction-based coupling device (friction clamp), which is applicable for pipelines and structures that are suspended in the water column and those that are resting on the seabed. The monitoring elements consist of fiber-optic sensors that are bonded to a metal clamshell with a high-friction coating. The friction clamp has a single hinge design to facilitate the operation of the clamp and dual rows of opposing fasteners to distribute the clamping force on the structure. The friction clamp can be installed by divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating, and in the design and testing of the prototype clamp device. Four-inch diameter and eight-inch diameter sub-scale friction clamp prototypes were built and tested to evaluate the strain

  14. Development and Testing of a Friction-Based Post-Installable Sensor for Subsea Fiber-Optic Monitoring System

    Science.gov (United States)

    Bentley, Nicole L.; Brower, David V.; Le, Suy Q.; Seaman, Calvin H.; Tang, Henry H.

    2017-01-01

    This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system that can be deployed on existing subsea structures. This paper provides a summary of the design concept, prototype development, prototype performance testing, and design refinements of the device. The results of the laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are included in this paper. Limitations of the initial design were identified and future design improvements were proposed. These new features will enhance the coupling of the device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based coupling devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on subsea structures, flowlines or risers. The work described in this paper investigates the design of a friction-based coupling device (friction clamp), which is applicable for pipelines and structures that are suspended in the water column and those that are resting on the seabed. The monitoring elements consist of fiber-optic sensors that are bonded to a metal clamshell with a high-friction coating. The friction clamp has a single hinge design to facilitate the operation of the clamp and dual rows of opposing fasteners to distribute the clamping force on the structure. The friction clamp can be installed by divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating, and in the design and testing of the prototype clamp device. Four-inch diameter and eight-inch diameter sub-scale friction clamp prototypes were built and tested to evaluate the strain

  15. Environmental Monitoring Techniques and Equipment related to the installation and operation of Marine Energy Conversion Systems

    International Nuclear Information System (INIS)

    Scanu, Sergio; Carli, Filippo Maria; Piermattei, Viviana; Bonamano, Simone; Paladini de Mendoza, Francesco; Marcelli, Marco; Peviani, Maximo Aurelio; Dampney, Keith; Norris, Jennifer

    2015-01-01

    Results of activities under project Marine Renewables Infrastructure Network for Emerging Energy Technologies (MaRINET) are reported, which led to DEMTE, a database, created on the basis of standardized monitoring of the marine environment during installation, operation and decommissioning of Marine Energy Conversion Systems. Obtained with the consortium partners’ available techniques and equipment, the database shows that such instruments cover all identified marine environmental compartments, despite the lack of underwater vehicles and the reduced skills in using satellite technologies. These weaknesses could be overcome by an accurate planning of equipment, techniques and knowledge sharing. The approach here presented also leads to an effective analysis even in non-marine contexts

  16. Computer-controlled radiation monitoring system

    International Nuclear Information System (INIS)

    Homann, S.G.

    1994-01-01

    A computer-controlled radiation monitoring system was designed and installed at the Lawrence Livermore National Laboratory's Multiuser Tandem Laboratory (10 MV tandem accelerator from High Voltage Engineering Corporation). The system continuously monitors the photon and neutron radiation environment associated with the facility and automatically suspends accelerator operation if preset radiation levels are exceeded. The system has proved reliable real-time radiation monitoring over the past five years, and has been a valuable tool for maintaining personnel exposure as low as reasonably achievable

  17. Installation of a variable-angle spectrometer system for monitoring diffuse and global solar radiation

    Science.gov (United States)

    Ormachea, O.; Abrahamse, A.; Tolavi, N.; Romero, F.; Urquidi, O.; Pearce, J. M.; Andrews, R.

    2013-11-01

    We report on the design and installation of a spectrometer system for monitoring solar radiation in Cochabamba, Bolivia. Both the light intensity and the spectral distribution affect the power produced by a photovoltaic device. Local variations in the solar spectrum (especially compared to the AM1.5 standard) may have important implications for device optimization and energy yield estimation. The spectrometer system, based on an Ocean Optics USB4000 (300-900nm) spectrometer, was designed to increase functionality. Typically systems only record the global horizontal radiation. Our system moves a fiber-optic cable 0-90 degrees and takes measurements in 9 degree increments. Additionally, a shadow band allows measurement of the diffuse component of the radiation at each position. The electronic controls utilize an Arduino UNO microcontroller to synchronizes the movement of two PAP bipolar (stepper) motors with the activation of the spectrometer via an external trigger. The spectrometer was factory calibrated for wavelength and calibrated for absolute irradiance using a Sellarnet SL1-Cal light source. We present preliminary results from data taken March-June, 2013, and comment on implications for PV devices in Cochabamba.

  18. An Electrical Energy Consumption Monitoring and Forecasting System

    Directory of Open Access Journals (Sweden)

    J. L. Rojas-Renteria

    2016-10-01

    Full Text Available Electricity consumption is currently an issue of great interest for power companies that need an as much as accurate profile for controlling the installed systems but also for designing future expansions and alterations. Detailed monitoring has proved to be valuable for both power companies and consumers. Further, as smart grid technology is bound to result to increasingly flexible rates, an accurate forecast is bound to prove valuable in the future. In this paper, a monitoring and forecasting system is investigated. The monitoring system was installed in an actual building and the recordings were used to design and evaluate the forecasting system, based on an artificial neural network. Results show that the system can provide detailed monitoring and also an accurate forecast for a building’s consumption.

  19. Uranium concentration monitor manual: 2300 system

    International Nuclear Information System (INIS)

    Russo, P.A.; Sprinkle, J.K. Jr.; Stephens, M.M.

    1985-04-01

    This manual describes the design, operation, and procedures for measurement control for the automated uranium concentration monitor on the 2300 solvent extraction system at the Oak Ridge Y-12 Plant. The nonintrusive monitor provides a near-real time readout of uranium concentration at two locations simultaneously in the solvent extraction system for process monitoring and control. Detectors installed at the top of the extraction column and at the bottom of the backwash column acquire spectra of gamma rays from the solvent extraction solutions in the columns. Pulse-height analysis of these spectra gives the concentration of uranium in the organic product of the extraction column and in the aqueous product of the solvent extraction system. The visual readouts of concentrations for process monitoring are updated every 2 min for both detection systems. Simultaneously, the concentration results are shipped to a remote computer that has been installed by Y-12 to demonstrate automatic control of the solvent extraction system based on input of near-real time process operation information. 8 refs., 13 figs., 4 tabs

  20. Data monitoring system for PV solar generators

    International Nuclear Information System (INIS)

    Stoev, M.; Katerski, A.; Williams, A.

    2000-01-01

    The two 1.5 kWp photovoltaic (PV) solar generators are installed and the new PC data monitoring system is developed by applying EC standards for European Solar Test Installation (ESTI). The schematic system diagram of PV generator is presented. The recording parameters for analytical and global monitoring are discussed. The meteorological data from ESTI sensors, temperature sensor and electrical data from inverter and calibrated shunt are stored via analog digital converters (ADC) on a hard disk of data storage PC. Data Logger and Monitor software for automatic data acquisition, treatment and visual distance control of all output PV data from PV solar generator has been created

  1. Quebec firm develops satellite monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2004-09-01

    Satellite-based technology that gives project owners an affordable way to monitor and control wind turbine operation, even in remote sites, is announced. Called Satwind, the system can be adapted to any scale, ranging from simple, low-cost units for small wind turbines to advanced versions designed to handle more complex wind-diesel installations, as well as large turbines used in offshore projects. Current installations include a turbine in the Tunisian desert and two Quebec wind-diesel plants accessible only by helicopter. The system can be operated directly from a cell-phone, in a user-friendly Internet manner, without the need to be connected to a complex centralized wind farm monitoring system.

  2. Radiation safety system (RSS) backbones: Design, engineering, fabrication and installation

    International Nuclear Information System (INIS)

    Wilmarth, J.E.; Sturrock, J.C.; Gallegos, F.R.

    1998-01-01

    The Radiation Safety System (RSS) Backbones are part of an electrical/electronic/mechanical system insuring safe access and exclusion of personnel to areas at the Los Alamos Neutron Science Center (LANSCE) accelerator. The RSS Backbones control the safety fusible beam plugs which terminate transmission of accelerated ion beams in response to predefined conditions. Any beam or access fault of the backbone inputs will cause insertion of the beam plugs in the low energy beam transport. The Backbones serve the function of tying the beam plugs to the access control systems, beam spill monitoring systems and current-level limiting systems. In some ways the Backbones may be thought of as a spinal column with beam plugs at the head and nerve centers along the spinal column. The two Linac Backbone segments and experimental area segments form a continuous cable plant over 3,500 feet from beam plugs to the tip on the longest tail. The Backbones were installed in compliance with current safety standards, such as installation of the two segments in separate conduits or tray. Monitoring for ground-faults and input wiring verification was an added enhancement to the system. The system has the capability to be tested remotely

  3. Power supply regulation systems installed in the Fermilab accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Hays, S.; Wolff, D.; Pfeffer, H.

    1991-11-01

    A variety of current and voltage regulation systems have been installed in the Fermilab large magnet system. The four major systems employ different methods to achieve the desired degree of regulation. The methods include computer control and feedback, adaptive learning, precision (10ppm) current monitoring, and the use of feed-forward signals. This paper will explain each method used and present the measured regulation of the above systems. Also an overview of planned upgrades and improvements will be presented.

  4. Safety system status monitoring

    International Nuclear Information System (INIS)

    Lewis, J.R.; Morgenstern, M.H.; Rideout, T.H.; Cowley, P.J.

    1984-03-01

    The Pacific Northwest Laboratory has studied the safety aspects of monitoring the preoperational status of safety systems in nuclear power plants. The goals of the study were to assess for the NRC the effectiveness of current monitoring systems and procedures, to develop near-term guidelines for reducing human errors associated with monitoring safety system status, and to recommend a regulatory position on this issue. A review of safety system status monitoring practices indicated that current systems and procedures do not adequately aid control room operators in monitoring safety system status. This is true even of some systems and procedures installed to meet existing regulatory guidelines (Regulatory Guide 1.47). In consequence, this report suggests acceptance criteria for meeting the functional requirements of an adequate system for monitoring safety system status. Also suggested are near-term guidelines that could reduce the likelihood of human errors in specific, high-priority status monitoring tasks. It is recommended that (1) Regulatory Guide 1.47 be revised to address these acceptance criteria, and (2) the revised Regulatory Guide 1.47 be applied to all plants, including those built since the issuance of the original Regulatory Guide

  5. Safety system status monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, J.R.; Morgenstern, M.H.; Rideout, T.H.; Cowley, P.J.

    1984-03-01

    The Pacific Northwest Laboratory has studied the safety aspects of monitoring the preoperational status of safety systems in nuclear power plants. The goals of the study were to assess for the NRC the effectiveness of current monitoring systems and procedures, to develop near-term guidelines for reducing human errors associated with monitoring safety system status, and to recommend a regulatory position on this issue. A review of safety system status monitoring practices indicated that current systems and procedures do not adequately aid control room operators in monitoring safety system status. This is true even of some systems and procedures installed to meet existing regulatory guidelines (Regulatory Guide 1.47). In consequence, this report suggests acceptance criteria for meeting the functional requirements of an adequate system for monitoring safety system status. Also suggested are near-term guidelines that could reduce the likelihood of human errors in specific, high-priority status monitoring tasks. It is recommended that (1) Regulatory Guide 1.47 be revised to address these acceptance criteria, and (2) the revised Regulatory Guide 1.47 be applied to all plants, including those built since the issuance of the original Regulatory Guide.

  6. Renewable energy systems in Mexico: Installation of a hybrid system

    Science.gov (United States)

    Pate, Ronald C.

    1993-05-01

    Sandia has been providing technical leadership on behalf of DOE and CORECT on a working level cooperative program with Mexico on renewable energy (PROCER). As part of this effort, the Sandia Design Assistance Center (DAC) and the solar energy program staff at Instituto de Investigaciones Electricas (IIE) in Cuernavaca, Mexico, recently reached agreement on a framework for mutually beneficial technical collaboration on the monitoring and field evaluation of renewable energy systems in Mexico, particularly village-scale hybrid systems. This trip was made for the purpose of planning the details for the joint installation of a data acquisition system (DAS) on a recently completed PV/Wind/Diesel hybrid system in the village of Xcalac on the Southeast coast of the state of Quintana Roo, Mexico. The DAS installation will be made during the week of March 15, 1993. While in Mexico, discussions were also held with personnel from.the National Autonomous University of Mexico (UNAM) Solar Energy Laboratory and several private sector companies with regard to renewable energy project activities and technical and educational support needs in Mexico.

  7. A radiation monitoring system for nuclear power plants

    International Nuclear Information System (INIS)

    Iwai, Masaru; Nakamori, S.; Ikeda, H.; Oda, M.

    1974-01-01

    Safety with respect to radiation is vital factor, particularly in view of the increasing number of nuclear power plants. For this purpose, a radiation monitoring system is provided to perform constant supervision. This article describes the purpose, installation location, specifications and circuitry of a system which is divided into three units: the process monitor, area monitor and off-site monitor. (auth.)

  8. Performace Of Multi-Probe Corrosion Monitoring Systems At The Hanford Site

    International Nuclear Information System (INIS)

    Carothers, K.D.; Boomer, K.D.; Anda, V.S.; Dahl, M.M.; Edgemon, G.L.

    2010-01-01

    Between 2007 and 2009, several different multi-probe corrosion monitoring systems were designed and installed in high-level nuclear waste tanks at the U.S. Department of Energy's Hanford Site in WaShington State. The probe systems are being monitored to ensure waste tanks operate in regions that minimize localized corrosion (i.e., pitting) and stress corrosion cracking. The corrosion monitoring systems have been installed in wastes with different chemistry types. An ongoing effort during the same time period has generated non-radioactive simulants that are tested in the laboratory to establish baseline corrosion monitoring system performance and characterize data to allow interpretation of readings from the multiple corrosion monitoring systems. Data collection from these monitoring systems has reached the point where the results allow comparison with the laboratory testing. This paper presents analytical results from the corrosion monitoring system development program.

  9. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true If I monitor brew ethanol, what are my... monitor brew ethanol, what are my monitoring installation, operation, and maintenance requirements? (a... considered by us to be generally optimum. Use the brew-to-exhaust correlation equation established under § 63...

  10. Monitoring and evaluation of Blyth Offshore Wind Farm. Installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, L.

    2001-07-01

    The principle aim of this report is to appraise the practical aspects of installation and commissioning of the offshore wind farm. The construction and installation activities of the project were monitored and reviewed by the project team to enable recommendations for future larger projects to be made. This report particularly looks at how the project progressed against the construction and installation schedule with regard to weather conditions and operational procedures. The document not only describes the methods of installation, assembly and cable laying, but also reviews the effectiveness of those methods including any difficulties that were encountered and the solutions that were found. (author)

  11. Integrating existing radiation monitors into a microprocessor-based display system

    International Nuclear Information System (INIS)

    Kalita, R, S.; Bartucci, C.M.; Mason, R.G.; Greaves, C.

    1992-01-01

    Plantwide digital radiation monitoring systems (RMSs) have been generally installed as part of the original design for newer nuclear reactors. For older plants, area and process radiation monitors were either analog or a combination of analog and digital but were not part of an integrated system design. At some plants, individual monitors have been replaced or modified, resulting in a rainbow of different monitors and vendors being represented at the plant. Usually at some point, consideration is given to replacing these monitors with a state-of-the-art RMS to improve overall reliability and achieve the benefits of sound human factors engineering. This can be a very costly project in terms of expenditures for engineering, equipment, construction, startup, and time. When human engineering deficiencies (HEDs) became an issue at Zion station, Commonwealth Edison elected to install a computer-based radiation monitoring display system (RMDS) that would interface existing raidation monitors. After reviewing the existing as-built RMS configuration and internal circuits of the various monitors, it was concluded that a microprocessor-based RMDS could be successfully designed and installed that would solve the HEDs and would tie the older analog channels into a system configuration. Although in many cases, internal modifications were made to existing RMS monitors, the RMDS upgrade allowed the existing RMS monitors to retain their original functionality and location

  12. Guidelines for safety related telecommunications systems on normally unattended fixed offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    Guidance is given on the design of telecommunications systems required for safety purposes on normally unattended offshore installations associated with oil and gas production on the United Kingdom continental shelf. The guidelines are mainly concerned with ensuring that: while the installation is unattended, its operation can be remotely monitored and controlled effectively to prevent the escalation of any abnormal situation; the installation can be safely approached when it is necessary to transfer personnel on board; persons on board, for example for inspection or maintenance activities, are safe. (UK)

  13. Online remote radiological monitoring during operation of Advance Vitrification System (AVS), Tarapur

    International Nuclear Information System (INIS)

    Deokar, U.V.; Kulkarni, V.V.; Mathew, P.; Khot, A.R.; Singh, K.K.; Kamlesh; Deshpande, M.D.; Kulkarni, Y.

    2010-01-01

    Advanced Vitrification System (AVS) is commissioned for vitrification of high level waste (HLW) by using Joule heated ceramic melter first time in India. The HLW is generated in fuel reprocessing plant. For radiological surveillance of plant, Health Physics Unit (HPU) had installed 37 Area Gamma Monitors (AGM), 7 Continuous Air Monitors (CAM) and all types of personal contamination monitors. Exposure control is a major concern in operating plant. Therefore in addition to installed monitors, we have developed online remote radiation monitoring system to minimize exposures to the surveyor and operator. This also helped in volume reduction of secondary waste. The reliability and accuracy of the online monitoring system is confirmed by calibrating the system by comparing TLD and DRD readings and by theoretical analysis. In addition some modifications were carried in HP instruments to make them user friendly. This paper summarizes different kinds of remote radiological monitoring systems installed for online monitoring of Melter off Gas (MOG) filter, Hood filter, three exhaust filter banks, annulus air sampling and over pack monitoring in AVS. Our online remote monitoring system has helped the plant management to plan in advance for replacement of these filters, which resulted in considerable saving of collective dose. (author)

  14. The Savannah River Site's Groundwater Monitoring Program 1991 well installation report

    International Nuclear Information System (INIS)

    1992-06-01

    This report is a summary of the well and environmental soil boring information compiled for the groundwater monitoring program of the Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) at the Savannah River Site (SRS) during 1991. It includes discussion of environmental soil borings, surveying, well installations, abandonments, maintenance, and stabilization

  15. ZPR-9 airborne plutonium monitoring system

    International Nuclear Information System (INIS)

    Rusch, G.K.; McDowell, W.P.; Knapp, W.G.

    1975-01-01

    An airborne plutonium monitoring system which is installed in the ZPR-9 (Zero Power Reactor No. 9) facility at Argonne National Laboratory is described. The design and operational experience are discussed. This monitoring system utilizes particle size and density discrimination, alpha particle energy discrimination, and a background-subtraction techique operating in cascade to separate airborne-plutonium activity from other, naturally occurring, airborne activity. Relatively high sensitivity and reliability are achieved

  16. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    Energy Technology Data Exchange (ETDEWEB)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.

  17. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    International Nuclear Information System (INIS)

    GREENE, G.A.; GUPPY, J.G.

    1998-01-01

    This is the final report on the INSP project entitled, ''Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant

  18. Design of multi-function Hanford tank corrosion monitoring system

    International Nuclear Information System (INIS)

    EDGEMON, G.L.

    1999-01-01

    A multi-fiction corrosion monitoring system has been designed for installation into DST 241-AN-105 at the Hanford Site in fiscal year 1999. The 241-AN-105 system is the third-generation corrosion monitoring system described by TTP RLO-8-WT-21. Improvements and upgrades from the second-generation system (installed in 241-AN-102) that have been incorporated into the third-generation system include: Gasket seating surfaces utilize O-rings instead of a washer type gasket for improved seal; Probe design contains an equally spaced array of 22 thermocouples; Probe design contains an adjustable verification thermocouple; Probe design contains three ports for pressure/gas sampling; Probe design contains one set of strain gauges to monitor probe flexure if flexure occurs; Probe utilizes an adjustable collar to allow depth adjustment of probe during installation; System is capable of periodically conducting LPR scans; System is housed in a climate controlled enclosure adjacent to the riser containing the probe; System uses wireless Ethernet links to send data to Hanford Local Area Network; System uses commercial remote access software to allow remote command and control; and Above ground wiring uses driven shields to reduce external electrostatic noise in the data. These new design features have transformed what was primarily a second-generation corrosion monitoring system into a multi-function tank monitoring system that adds a great deal of functionality to the probe, provides for a better understanding of the relationship between corrosion and other tank operating parameters, and optimizes the use of the riser that houses the probe in the tank

  19. Governor stability simulations of Svartisen power plant verified by the installed monitoring system on site

    International Nuclear Information System (INIS)

    Nielsen, T K; Kjeldsen, M

    2010-01-01

    Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower

  20. Governor stability simulations of Svartisen power plant verified by the installed monitoring system on site

    Science.gov (United States)

    Nielsen, T. K.; Kjeldsen, M.

    2010-08-01

    Many Norwegian hydro power plants have complex lay-out with several reservoirs, broke intakes, surge shafts and even air cushion chambers. There are kilometers of excavated tunnels as well as long tail water systems. The stations are often equipped by multiple of turbines, both in series and parallel. A number of operation modes are therefore possible. Doing transient simulations and simulations of governor stability in the design phase, the problem is to find the worst case scenario regarding these operating modes. Svartisen power plant has been of particular interest these days. The power plant is originally designed for two 350 MW Francis turbines, however, only one turbine was installed. When designed, governor stability was regarded as problematic due to the long penstock. A long penstock will give a too high time constant for the hydraulic inertia. The main problem here is, however, the water hammer frequency that interferes with the governor performance. The frequency is in the same range as the cross frequency. Therefore the governor will react on these water hammer waves, which in its nature is notoriously unstable. The common solution is to build an air cushion and thereby increase the water hammer frequency above the cross frequency. The expenses were, however, deemed too high, and it was necessary to seek for other solutions. A pressure feedback on the governor was introduced in order to have stable operation at least for two turbines. With only one turbine installed, the pressure feedback has not been activated because, based on the simulations, it was regarded unnecessary. Even if the original simulations shows good stability margins when only one turbine is running, there has been some indications that the aggregate has suffered from instability. In 2004 Svartisen Power Plant was equipped with a comprehensive monitoring system. Both the turbine and the generator performance have been observed. This gives valuable information on how the hydropower

  1. Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-09-01

    The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made

  2. The JOYO remote monitoring system

    International Nuclear Information System (INIS)

    Damico, Joseph P.; Hashimoto, Yu

    2000-01-01

    The evolution of the personal computer, operating systems and applications software and the Internet has brought drastic change and many benefits worldwide. Remote monitoring systems benefit from computer network and other modern software technologies. The availability of fast, inexpensive and secure communications enables new solutions for monitoring system applications. The JOYO Remote Monitoring System (RMS) utilizes computer network communications and modular software design to provide a distributed integrated solution for monitoring multiple storage locations. This paper describes the remote monitoring system installed at the JOYO Fast Reactor. The system combines sensors, software, and computer network technologies to create a powerful data collection, storage and dissemination capability. The RMS provides a flexible, scalable solution for a variety of applications. The RMS integrates a variety of state of the art technologies from several sources and serves as a test bed for cutting edge technologies that can be shared with outside users. This paper describes the system components and their operation and discusses system benefits. Current activities and future plants for the JOYO RMS will be discussed. (author)

  3. International remote monitoring project Argentina Nuclear Power Station Spent Fuel Transfer Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, S.; Lucero, R.; Glidewell, D.

    1997-01-01

    The Autoridad Regulataria Nuclear (ARN) and the United States Department of Energy (DOE) are cooperating on the development of a Remote Monitoring System for nuclear nonproliferation efforts. A Remote Monitoring System for spent fuel transfer will be installed at the Argentina Nuclear Power Station in Embalse, Argentina. The system has been designed by Sandia National Laboratories (SNL), with Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) providing gamma and neutron sensors. This project will test and evaluate the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguards efficiency. This paper provides a description of the monitoring system and its functions. The Remote Monitoring System consists of gamma and neutron radiation sensors, RF systems, and video systems integrated into a coherent functioning whole. All sensor data communicate over an Echelon LonWorks Network to a single data logger. The Neumann DCM 14 video module is integrated into the Remote Monitoring System. All sensor and image data are stored on a Data Acquisition System (DAS) and archived and reviewed on a Data and Image Review Station (DIRS). Conventional phone lines are used as the telecommunications link to transmit on-site collected data and images to remote locations. The data and images are authenticated before transmission. Data review stations will be installed at ARN in Buenos Aires, Argentina, ABACC in Rio De Janeiro, IAEA Headquarters in Vienna, and Sandia National Laboratories in Albuquerque, New Mexico. 2 refs., 2 figs

  4. Commissioning Measurements and Experience Obtained from the Installation of a Fissile Mass Flow monitor in the URAL Electrochemical Integrated Plant (UEIP) in Novouralsk

    International Nuclear Information System (INIS)

    March-Leuba, J.; Mastal, E.; Powell, D.; Sumner, J.; Uckan, T.; Vines, V.

    1999-01-01

    The Blend Down Monitoring System (BDMS) equipment sent earlier to the Ural Electrochemical Integrated Plant (UEIP) at Novouralsk, Russia, was installed and implemented successfully on February 2, 1999. The BDMS installation supports the highly enriched uranium (HEU) Transparency Implementation Program for material subject to monitoring under the HEU purchase agreement between the United States of America (USA) and the Russian Federation (RF). The BDMS consists of the Oak Ridge National Laboratory (ORNL) Fissile (uranium-235) Mass Flow Monitor (FMFM) and the Los Alamos National Laboratory (LANL) Enrichment Monitor (EM). Two BDMSs for monitoring the Main and Reserve HEU blending process lines were installed at UEIP. Independent operation of the FMFM Main and FMFM Reserve was successfully demonstrated for monitoring the fissile mass flow as well as the traceability of HEU to the product low enriched uranium. The FMFM systems failed when both systems were activated during the calibration phase due to a synchronization problem between the systems. This operational failure was caused by the presence of strong electromagnetic interference (EMI) in the blend point. The source-modulator shutter motion of the two FMFM systems was not being properly synchronized because of EMI producing a spurious signal on the synchronization cable connecting the two FMFM cabinets. The signature of this failure was successfully reproduced at ORNL after the visit. This unexpected problem was eliminated by a hardware modification and software improvements during a recent visit (June 9-11, 1999) to UEIP, and both systems are now operating as expected

  5. DIMOS: a new generation of nuclear power plant process monitoring systems

    International Nuclear Information System (INIS)

    Vlaminck, M. de; Gilliot, B.; Remacle, J.

    1993-01-01

    A new generation of nuclear power plant supervision systems is described, called DIMOS (DIstributed MOnitoring System). It was installed in August 1991 at the Doel nuclear power plant and is now monitoring reactors 1 and 2. The system represents one of the largest and most advanced process monitoring systems in operation. DIMOS has successfully provided the solution to the old system's limitations such as functional deficiencies, low response time, management and coherence of the data, maintenance costs, spare parts, and system availability. The use of the software development methodologies HOOD and ADA have not only allowed a rapid integration and installation of a robust system, but will also make further developments and improvements possible with maximum flexibility. (Z.S.) 2 figs

  6. Monte Carlo calculations of calibrations of calibration coefficients of ATL monitors installed at NPP Temelin

    International Nuclear Information System (INIS)

    Solc, J.; Suran, J.; Novotna, M.; Pavlis, J.

    2008-01-01

    The contribution describes a technique of determination of calibration coefficients of a radioactivity monitor using Monte Carlo calculations. The monitor is installed at the NPP Temelin adjacent to lines with a radioactive medium. The output quantity is the activity concentration (in Bq/m3) that is converted from the number of counts per minute measured by the monitor. The value of this conversion constant, i.e. calibration coefficient, was calculated for gamma photons emitted by Co-60 and compared to the data stated by the manufacturer and supplier of these monitors, General Atomic Electronic Systems, Inc., USA. Results of the comparison show very good agreement between calculations and manufacturer data; the differences are lower than the quadratic sum of uncertainties. (authors)

  7. Drinking-water monitoring systems

    International Nuclear Information System (INIS)

    1994-01-01

    A new measuring system was developed by the Austrian Research Centre Seibersdorf for monitoring the quality of drinking-water. It is based on the experience made with the installation of UWEDAT (registered trademark) environmental monitoring networks in several Austrian provinces and regions. The standard version of the drinking-water monitoring system comprises sensors for measuring chemical parameters in water, radioactivity in water and air, and meteorological values of the environment. Further measuring gauges, e.g. for air pollutants, can be connected at any time, according to customers' requirements. For integration into regional and supraregional networks, station computers take over the following tasks: Collection of data and status signals transmitted by the subsystem, object protection, intermediate storage and communication of data to the host or several subcentres via Datex-P postal service, permanent lines or radiotransmission

  8. Engineering Task Plan for Fourth Generation Hanford Corrosion Monitoring System

    International Nuclear Information System (INIS)

    NORMAN, E.C.

    2000-01-01

    This Engineering Task Plan (ETP) describes the activities associated with the installation of cabinets containing corrosion monitoring equipment on tanks 241-AN-102 and 241-AN-107. The new cabinets (one per tank) will be installed adjacent to existing corrosion probes already installed in riser WST-RISER-016 on both tanks. The corrosion monitoring equipment to be installed utilizes the technique of electrochemical noise (EN) for monitoring waste tank corrosion. Typically, EN consists of low frequency (4 Hz) and small amplitude signals that are spontaneously generated by electrochemical reactions occurring at corroding or other surfaces. EN analysis is well suited for monitoring and identifying the onset of localized corrosion, and for measuring uniform corrosion rates. A typical EN based corrosion-monitoring system measures instantaneous fluctuations in corrosion current and potential between three nominally identical electrodes of the material of interest immersed in the environment of interest. Time-dependent fluctuations in corrosion current are described by electrochemical current noise, and time-dependent fluctuations of corrosion potential are described by electrochemical noise. The corrosion monitoring systems are designed to detect the onset of localized corrosion phenomena if tank conditions should change to allow these phenomena to occur. In addition to the EN technique, the systems also facilitate the use of the Linear Polarization Resistance (LPR) technique to collect uniform corrosion rate information. LPR measures the linearity at the origin of the polarization curve for overvoltages up to a few millivolts away from the rest potential or natural corrosion potential. The slope of the current vs. voltage plot gives information on uniform corrosion rates

  9. Evaluation of a multiport groundwater monitoring system

    International Nuclear Information System (INIS)

    Gilmore, T.J.; Hall, S.H.; Olsen, K.B.; Spane, F.A. Jr.

    1991-03-01

    In 1988 and 1989, Pacific Northwest Laboratory installed a multiport groundwater monitoring system in two wells on the Hanford Site: one near the 216-B-3 Pond in the center of the Hanford Site and one just north of the 300 Area near the Columbia River. The system was installed to provide the US Department of Energy with needed three-dimensional data on the vertical distribution of contaminants and hydraulic heads on the Hanford Site. This study evaluates the ability of the multiport system to obtain hydrogeologic data at multiple points vertically in a single borehole, and addresses the representativeness of the data. Data collected from the two wells indicate that the multiport system is well suited for groundwater monitoring networks requiring three-dimensional characterization of the hydrogeologic system. A network of these systems could provide valuable information on the hydrogeologic environment. However, the advantages of the multiport system diminish when the system is applied to long-term monitoring networks (30+ years) and to deeper wells (<300 ft). For shallow wells, the multiport system provides data in a cost-effective manner that would not be reasonably obtainable with the conventional methods currently in use at the Hanford Site. 17 refs., 28 figs., 6 tabs

  10. ERMS - Environmental Radiation Monitoring System

    International Nuclear Information System (INIS)

    Vax, Eran; Sarusi, Benny; Sheinfeld, Mati; Levinson, Shmuel; Brandys, Irad; Sattinger, Danny; Wengrowicz, Udi; Tshuva, Avi; Tirosh, Dan

    2008-01-01

    A new Environmental Radiation Monitoring System (ERMS) has been developed in the NRCN as an extensive tool to be applied in case of nuclear malfunction or Nuclear Disposal Device (NDD) incident, as well as for routine radiation monitoring of the reactor's vicinity. The system collects real-time environmental data such as: gamma radiation, wind speed, wind direction, and temperature for monitoring purposes. The ERMS consists of a main Control Center and an array of monitoring stations. Fixed, environmental, gamma radiation monitoring stations are installed at the reactor's surroundings while portable stations can be posted rapidly along the wind direction, enhancing the spatial sampling of the radiation measurements and providing better hazard assessment at an emergency event. The presented ERMS, based on industrial standards for hardware and network protocols, is a reliable standalone system which upgrades the readiness to face a nuclear emergency event by supplying real-time, integrated meteorological and radiation data. (author)

  11. Solar heating and hot water system installed at James Hurst Elementary School, Portsmouth, Virginia

    Science.gov (United States)

    1981-01-01

    Solar heating and a hot water system installed in an elementary school in Portsmouth, Virginia are examined. The building is zoned into four heating/cooling areas. Each area is equipped with an air handling unit that is monitored and controlled by central control and monitoring system. The solar system for the building uses a collector area of 3,630 sq. ft. of flat plate liquid collectors, and a 6,000 gallon storage tank. System descriptions, maintenance reports, detailed component specifications, and design drawings to evaluate this solar system are reported.

  12. EDGAR, a new plant radiation monitoring system

    International Nuclear Information System (INIS)

    Vuong, Q.M.; Da Costa Vieira, D.

    2004-01-01

    The EDGAR system is a new radiation monitoring system for nuclear power plant, reprocessing plant and nuclear research reactor for radioactive contamination, gamma and neutron field monitoring. Developed by French Atomic Energy Agency, this system provides not only complete functions of standard RMS, also allows spectroscopy level detection of alpha and beta particles based on a patented collimator unit. A complete computerized approach has been taken allowing full installation control in a single PC based display and communication unit. (author)

  13. Operational readiness of filtered air discharge monitoring systems

    International Nuclear Information System (INIS)

    Lafortune, J.F.; Jamieson, T.J.

    1993-08-01

    An assessment of the operational readiness of the Filtered Air Discharge (FAD) Stack Monitoring systems, installed in Canadian CANDU nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on FAD stack monitoring system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of FAD stack monitoring systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for design and performance review guidelines for CANDU stations. A case study of the FAD stack monitoring system at Pickering NGS is also documented in this report

  14. Remote monitoring system workshop and technical cooperation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Soo; Kwack, E. H.; Yoon, W. K.; Kim, J. S.; Cha, H. Y.; Na, W.W

    2000-06-01

    RMS workshop at the year focus on installing the material monioring system at technology lab. within TCNC. This system was developed by cooperative monitoring center(CMC) belonging to Sandia national lab. MMS consisted of data storage computer, data collection computer and easily connet to DCM-14 camera using monitoring the NPP by IAEA. The system run when the motion is catching and stroes the event data to MMS server. Also, the system communicate with the internet and then they access to check the event data only if the authencated person.

  15. Remote monitoring system workshop and technical cooperation

    International Nuclear Information System (INIS)

    Kim, Jung Soo; Kwack, E. H.; Yoon, W. K.; Kim, J. S.; Cha, H. Y.; Na, W.W.

    2000-06-01

    RMS workshop at the year focus on installing the material monioring system at technology lab. within TCNC. This system was developed by cooperative monitoring center(CMC) belonging to Sandia national lab. MMS consisted of data storage computer, data collection computer and easily connet to DCM-14 camera using monitoring the NPP by IAEA. The system run when the motion is catching and stroes the event data to MMS server. Also, the system communicate with the internet and then they access to check the event data only if the authencated person

  16. Design of multi-channel analyzer's monitoring system based on embedded system

    International Nuclear Information System (INIS)

    Yang Tao; Wei Yixiang

    2007-01-01

    A new Multi-Channel Analyzer's Monitoring system based on ARM9 Embedded system is introduced in this paper. Some solutions to problem are also discussed during the procedure of design, installation and debugging on Linux system. The Monitoring system is developed by using MiniGUI and Linux software system API, with the functions of collecting, displaying and I/O data controlling 1024 channels datum. They are all realized in real time, with the merits of low cost, small size and portability. All these lay the foundation of developing homemade Digital and Portable nuclear spectrometers. (authors)

  17. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  18. Microcontroller based multi-channel ultrasonic level monitoring system

    International Nuclear Information System (INIS)

    Ambastha, K.P.; Chaudhari, Y.V.; Singh, Inder Jeet; Chadda, V.K.

    2004-01-01

    Microcontroller based Multi-channel Ultrasonic Level Monitoring System developed by Computer Division is based on echo ranging techniques to monitor level. The transmitter directs an ultrasonic burst towards the liquid, which gets reflected from the top of the liquid surface. The time taken for ultrasound to travel from the transmitter to the top of liquid surface is measured and used to calculate the liquid level. The system provides for temperature compensation for accurate measurement as the ultrasound velocity depends on the ambient temperature. It can measure liquid level up to 5 meters. A single monitor can be used to measure level in 6 tanks. PC connectivity has been provided via RS 232 and RS 485 for remote operation and data logging of level. A GUI program developed using LABVIEW package displays level on PC monitor. The program provides for pictorial as well as numerical display for level and temperature in the front panel on the PC monitor. A user can monitor level for any or all tanks from the PC. One unit is installed at CIRUS for measuring level in Acid/ Alkali tanks and one is installed at APSARA for measuring water level in the reactor pool. (author)

  19. Standard monitoring system for domestic heat pumps

    NARCIS (Netherlands)

    Geelen, C.P.J.M.; Oostendorp, P.A.

    1999-01-01

    In the years to come many domestic heat pump systems are to be installed in the Netherlands. The Dutch agency for energy and environment, NOVEM, and the association of energy utility companies, EnergieNed, give high priority to the monitoring of heat pump systems. The results of the projects,

  20. Monitoring of Federally Threatened and Endangered Species on U.S. Army Installations

    National Research Council Canada - National Science Library

    Mellon, Robert H; Balbach, Harold E; Ward, Michael

    2004-01-01

    ...) species on United States Army installations, and the results of a survey conducted to ascertain the kinds and quality of efforts being made to monitor these species in compliance with the Endangered...

  1. Evaluation Of Vibration-Monitoring Gear-Diagnostic System

    Science.gov (United States)

    Townsend, Dennis P.; Zakrajsek, James J.

    1995-01-01

    Report describes experimental evaluation of commercial electronic system designed to monitor vibration signal from accelerometer on gear-box to detect vibrations indicative of damage to gears. System includes signal-conditioning subsystem and personal computer in which analog-to-digital converter installed. Results show system fairly effective in detecting surface fatigue pits on spur-gear teeth.

  2. Radiation monitoring system in medical facilities

    International Nuclear Information System (INIS)

    Matsuno, Kiyoshi

    1981-01-01

    (1) RI selective liquid effluent monitor is, in many cases, used at medical facilities to obtain data for density of radioactivity of six radionuclides. In comparison with the conventional gross measuring systems, over-evaluation is less, and the monitor is more practical. (2) Preventive monitor for loss of radium needle is a system which prevents missing of radium needle at a flush-toilet in radium treatment wards, and this monitor is capable of sensing a drop-off of radium needle of 0.5 mCi (minimum). (3) Short-lived positron gas measuring device belongs to a BABY CYCLOTRON installed in a hospital, and this device is used to measure density of radioactivity, radioactive impurity and chemical impurity of produced radioactive gas. (author)

  3. Development and installation of a new on-line plant safety monitoring system for the Paks VVER-440 units

    International Nuclear Information System (INIS)

    Vegh, J.; Major, C.; Buerger, L.; Lipcsei, S.; Horvath, C.; Kapocs, G.; Eiler, J.; Hornaes, A.; Hulsund, J.E.

    2000-01-01

    The paper describes the architecture, modules, algorithms and human-machine interface of a new operator support system (OSS), which is integrated into the new, reconstructed Paks NPP plant computers. The main task of the new OSS is to perform continuous plant safety monitoring and assessment, it has the following basic functions: on-line evaluation and presentation of critical safety function (CSF) status trees, continuous evaluation and presentation of the actual safety status of the plant, displaying and browsing the new symptom-oriented EOPs, automatic displaying of those process signals which are quoted in the EOPs. The first version of the new operator support system was connected to the Paks NPP full scope simulator in October 1999. This configuration was later successfully applied for the simulator testing of the new symptom-oriented EOP set for the Paks NPP in November 1999. The installation process was continued in 2000: the new system started its operation on Unit 2 (June) and on Unit 1 (August), together with the reconstructed, new PCS. (author)

  4. The design and installation of a core discharge monitor for CANDU-type reactors

    International Nuclear Information System (INIS)

    Halbig, J.K.; Monticone, A.C.; Ksiezak, L.; Smiltnieks, V.

    1990-01-01

    A new type of surveillance systems that monitors neutron and gamma radiation in a reactor containment is being installed at the Ontario Hydro Darlington Nuclear Generating Station A, Unit 2. Unlike video or film surveillance that monitors mechanical motion, this system measures fuel-specific radiation emanating from irradiated fuel as it is pushed from the core of CANDU-type reactors. Proof-of-principle measurements have been carried out at Bruce Nuclear Generating Station A, Unit 3. The system uses (γ,n) threshold detectors and ionization detectors. A microprocessor-based electronics package, GRAND-II (Gamma Ray and Neutron Detector electronics package), provides detector bias, preamplifier power, and signal processing. Firmware in the GRAND-2 controls the surveillance activities, including data acquisition and a level of detector authentication, and it handles authenticated communication with a central data logging computer. Data from the GRAND-II are transferred to an MS-DOS-compatible computer and stored. These data are collected and reviewed for fuel-specific radiation signatures from the primary detector and proper ratios of signals from secondary detectors. 5 figs

  5. Loose parts monitoring system

    International Nuclear Information System (INIS)

    Wakasa, Kohji; Nishida, Eiichi; Ishii, Kazuo; Yamanaka, Hiroto.

    1987-01-01

    In the loose parts monitoring system (LPMS), installed for integrity monitoring of the nuclear power plants; when there occur foreign metallic objects in the reactor primary system, including a steam generator and the piping, the sounds caused by them moving with the cooling water and thereby getting in contact with various structures are detected. Its purpose is, therefore, to detect any abnormality in the reactor plant system through such abnormal sounds due to loose or fallen supports etc., and so provide this information to the reactor operators. In principle, accelerometers are distributed in such as reactor vessel, steam generator, coolant pumps, etc., so that various sounds are collected and converted into electrical signals, followed by analysis of the data. Described are the LPMS configuration/functions, the course taken in LPMS development, future problems, etc. (Mori, K.)

  6. Uzbekistan Radiation Portal Monitoring System

    International Nuclear Information System (INIS)

    Richardson, J; Knapp, R; Loshak, A; Yuldashev, B; Petrenko, V

    2005-01-01

    The work proposed in this presentation builds on the foundation set by the DTRA funded demonstration project begun in 2000 and completed in December of 2003. This previous work consisted of two phases whose overall objective was to install portal radiation monitors at four select ports-of-entry in Uzbekistan (Tashkent International Airport, Gisht-Kuprik (Kazakhstan border), Alat (Turkmenistan border), and Termez (Afghanistan border)) in order to demonstrate their effectiveness in preventing the illicit trafficking of nuclear materials. The objectives also included developing and demonstrating capabilities in the design, installation, operation, training, and maintenance of a radiation portal monitoring system. The system and demonstration project has proved successful in many ways. An effective working relationship among the Uzbekistan Customs Services, Uzbekistan Border Guards, and Uzbekistan Institute of Nuclear Physics has been developed. There has been unprecedented openness with the sharing of portal monitor data with Lawrence Livermore National Laboratory. The system has proved to be effective, with detection of illicit trafficking, and, at Alat, an arrest of three persons illegally transporting radioactive materials into Turkmenistan. The demonstration project has made Uzbekistan a model nonproliferation state in Central Asia and, with an expanded program, places them in a position to seal a likely transit route for illicit nuclear materials. These results will be described. In addition, this work is currently being expanded to include additional ports-of-entry in Uzbekistan. The process for deciding on which additional ports-of-entry to equip will also be described

  7. GTA Beamloss-Monitor System

    International Nuclear Information System (INIS)

    Rose, C.R.; Fortgang, C.M.; Power, J.P.

    1992-01-01

    The GTA Beamless-Monitor System at Los Alamos National Laboratory has been designed to detect high-energy particle loss in the accelerator beamline and shut down the accelerator before any damage can occur. To do this, the Beamless-Monitor System measures the induced gamma radiation, from (p, γ) reactions, at 15 selected points along the beamline, converts this measured radiation to electrical signals integrates and compares them to preset limits, and, in the event of an over-limit condition causes the Fast-Protect System to shut down the entire accelerator. The system dynamic range exceeds 70 dB which will enable experimenters to use the Beamless-Monitor System to help steer the beam as well as provide signals for a Fast-Protect System. The system response time is less than 7 μs assuming a step-function, worst-case beam spill of 50 mA. The system resolution, based on the noise floor of the electronics is about 1.3 mRads/s. Production units have been built and meet the above specifications. The remainder of the system will be installed and tested later in 1992/1993 with the GTA accelerator. The ionization chamber sensitivity and response time are described in the paper

  8. GTA beamloss-monitor system

    International Nuclear Information System (INIS)

    Rose, C.R.; Fortgang, C.M.; Power, J.P.

    1992-01-01

    The GTA Beamloss-Monitor System at Los Alamos National Laboratory has been designed to detect high-energy particle loss in the accelerator beamline and shut down the accelerator before any damage can occur. To do this, the Beamloss-Monitor System measures the induced gamma radiation, from (p,γ) reactions, at 15 selected points along the beamline, converts this measured radiation to electrical signals, integrates and compares them to preset limits, and, in the event of an over-limit condition causes the Fast-Protect System to shut down the entire accelerator. The system dynamic range exceeds 70 dB which will enable experimenters to use the Beamloss-Monitor System to help steer the beam as well as provide signals for a Fast-Protect System. The system response time is less than 7 μs assuming a step-function, worst-case beam spill of 50 mA. The system resolution, based on the noise floor of the electronics, is about 1.3 mRads/s. Production units have been built and meet the above specifications. The remainder of the system will be installed and tested later in 1992/93 with the GTA accelerator. The ionization chamber sensitivity and response time are described in the paper. (Author) 4 figs., ref

  9. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  10. Design and installation of a laboratory-scale system for radioactive waste treatment

    International Nuclear Information System (INIS)

    Berger, D.N.; Knox, C.A.; Siemens, D.H.

    1980-05-01

    Described are the mechanical design features and remote installation of a laboratory-scale radiochemical immobilization system which is to provide a means at Pacific Northwest Laboratory of studying effluents generated during solidification of high-level liquid radioactive waste. Detailed are the hot cell, instrumentation, two 4-in. and 12-in. service racks, the immobilization system modules - waste feed, spray calciner unit, and effluent - and a gamma emission monitor system for viewing calcine powder buildup in the spray calciner/in-can melter

  11. Design and installation of earth energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, S; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2002-07-01

    This first edition of the Canadian Standards Association (CSA) Standard C448 Series, replaces CSA Standards CAN/CSA-C445-M92 entitled Design and Installation of Earth Energy Heat Pump Systems for Residential and Other Small Buildings, as well as C447-94 entitled Design and Installation of Earth Energy Heat Pump Systems for Commercial and Institutional Buildings. This standard document consists of three parts: (C448.1) Design and installation of earth energy systems for commercial and institutional buildings; (C448.2) Design and installation of earth energy systems for residential and small buildings; and, (C448.3) Design and installation of underground thermal energy storage systems for commercial and institutional buildings. In C448.1, the requirements applicable to any system falling within the scope of the C448 series were included. Alternative requirements for houses and small buildings were added in C448.2. It was noted that either standard may be implemented. The standards applicable to the intentional storage of energy in the earth for later use were presented in C448.3. This latter section includes a brief introduction on underground thermal energy storage (UTES). tabs.

  12. The unrest of S. Miguel volcano (El Salvador, CA): installation of the monitoring network and observed volcano-tectonic ground deformation

    Science.gov (United States)

    Bonforte, A.; Hernandez, D.; Gutiérrez, E.; Handal, L.; Polío, C.; Rapisarda, S.; Scarlato, P.

    2015-10-01

    On 29 December 2013, the Chaparrastique volcano in El Salvador, close to the town of S. Miguel, erupted suddenly with explosive force, forming a more than 9 km high column and projecting ballistic projectiles as far as 3 km away. Pyroclastic Density Currents flowed to the north-northwest side of the volcano, while tephras were dispersed northwest and north-northeast. This sudden eruption prompted the local Ministry of Environment to request cooperation with Italian scientists in order to improve the monitoring of the volcano during this unrest. A joint force made up of an Italian team from the Istituto Nazionale di Geofisica e Vulcanologia and a local team from the Ministerio de Medio Ambiente y Recursos Naturales was organized to enhance the volcanological, geophysical and geochemical monitoring system to study the evolution of the phenomenon during the crisis. The joint team quickly installed a multi-parametric mobile network comprising seismic, geodetic and geochemical sensors, designed to cover all the volcano flanks from the lowest to the highest possible altitudes, and a thermal camera. To simplify the logistics for a rapid installation and for security reasons, some sensors were co-located into multi-parametric stations. Here, we describe the prompt design and installation of the geodetic monitoring network, the processing and results. The installation of a new ground deformation network can be considered an important result by itself, while the detection of some crucial deforming areas is very significant information, useful for dealing with future threats and for further studies on this poorly monitored volcano.

  13. Blind spot monitoring in light vehicles -- system performance.

    Science.gov (United States)

    2014-07-01

    This report summarizes findings of a small population study of blind spot monitoring systems (BSM) installed by : original vehicle manufacturers on standard production vehicles. The primary goals of these tests were to simulate real-world driving sce...

  14. Retrofitting of an improved stack monitoring system in Rajasthan atomic power station

    International Nuclear Information System (INIS)

    Natarajan, K.

    1985-01-01

    The problems encountered in the measurement of inert gas activities, iodine activity and tritium activity released through the stack in RAPS are described and the considerations for the development of improved instruments outlined. The new approach provides for better accuracy of measurement of all the relevant radioactive parameters in the stack at one centralised place. The construction work in the station for the newly conceived stack activity monitoring system is completed and the earlier equipment used is installed in the room temporarily. Development prototypes of stack inert gas monitoring system and iodine monitoring system as described in Section 5 are made and evaluated. Fabrication of new equipment for retrofitting in RAPS is in progress and these will replace the equipment temporarily installed in the station

  15. Monitoring and analysis of an absorption air-conditioning system

    Energy Technology Data Exchange (ETDEWEB)

    Perez de Vinaspre, M.; Bourouis, M.; Coronas, A. [Centro de Innovacion Tecnologica en Revalorizacion Energetica y Refrigeracion, Tarragona (Spain); Garcia, A.; Soto, V.; Pinazo, J.M. [E.T.S. Ingenieros Industriales, Valencia (Spain)

    2004-09-01

    In the last few years, high-energy consumption due to air-conditioning has led to a growing interest in the efficient use of energy in buildings. Although simulation programs have always been the main tools for analyzing energy in buildings, the reliability of their results is often compromised by a lack of certainty to reflect real conditions. The aim of this work is to monitorize and analyze the thermal behavior of an absorption-based air-conditioning installation of a university building in Tarragona, Spain. The existing monitoring system of the installation has been improved by implementing additional sensors and flow meters. The data has been stored during summer 2002 and used to assess the energy balance of the air-conditioning installation and the operational regime of the absorption chiller. [Author].

  16. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  17. Solar system installation at Louisville, Kentucky

    Science.gov (United States)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  18. Smartfactory, a modular, low cost productivity monitoring system

    CSIR Research Space (South Africa)

    Bosscha, PA

    2010-07-01

    Full Text Available lack of objectivity and plain incorrect data entries. In aid of the SMMEs the Smartfactory system offers a low-cost modular monitoring solution capable of implementation in a step by step fashion with little training required in installation...

  19. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  20. Embedded data acquisition system for neutron monitors

    International Nuclear Information System (INIS)

    Población, Ó G; Tejedor, I G; Sánchez, S; Blanco, J J; Gómez-Herrero, R; Medina, J; Steigies, C T

    2014-01-01

    This article presents the design and implementation of a new data acquisition system to be used as replacement for the old ones that have been in use with neutron monitors for the last decades and, which are eventually becoming obsolete. This new system is also intended to be used in new installations, enabling these scientific instruments to use today's communication networks to send data and receive commands from the operators. This system is currently running in two stations: KIEL2, in the Christian-Albrechts-Universität zu Kiel, Kiel, Germany, and CALMA, in the Castilla-La Mancha Neutron Monitor, Guadalajara, Spain

  1. Air Quality Monitoring and Information System for Egypt

    Energy Technology Data Exchange (ETDEWEB)

    Sivertsen, B.

    1996-06-01

    The publication relates to the main objectives and design of a modern monitoring and information system developed in Norway. The system is to be installed in Egypt. Themes being discussed cover technical features of the system, meteorological data, environmental indicators, data transfer and quality assurance, the data bases, data presentation - graphics and GIS, and environmental information to the public. 11 figs., 1 tab.

  2. Bulk laundry monitoring system

    International Nuclear Information System (INIS)

    Thakur, Vaishali M.; Jain, Amit; Verma, Amit; Anilkumar, S.; Babu, D.A.R.; Sharma, D.N.; Rande, N.R.; Singh, B.N.

    2012-01-01

    Protective wear (like boiler suits, hand gloves etc.) is essential while handling radioactive material in plants/laboratories. During the course of work, it is quite possible that protective wear may get contaminated. These protective wears are packed in laundry bags and send to Decontamination Centre (DC). There is a need for monitoring the laundry bags at the time of receipt, as well as before dispatch to respective locations to comply with AERB guidelines, To avoid cross contamination during wash cycle, contaminated bags (> 0.5 mR/h on surface) need to be segregated. Present paper describes the development of such system for monitoring surface dose rate on bags at the time of receipt. The system installed at ETP after calibration, effectively segregates the contaminated bags from the rest and prevents from cross contamination during wash cycle. Reduction in man-rem consumption due to semi automatic monitoring. Improved sensitivity due to good geometry, long counting time, background and attenuation corrections. Optimum utilization of decontamination chemicals based on level of contamination and keeping track of its inventory. Generation of decontamination process data base for improvement

  3. The SSRL injector beam position monitoring systems

    International Nuclear Information System (INIS)

    Lavender, W.; Baird, S.; Brennan, S.; Borland, M.; Hettel, R.; Nuhn, H.D.; Ortiz, R.; Safranek, J.; Sebek, J.; Wermelskirchen, C.; Yang, J.

    1991-01-01

    The beam position monitoring system of the SSRL injector forms a vital component of its operation. Several different types of instrumentation are used to measure the position or intensity of the electron beam in the injector. These include current toroids, fluorescent screens, Faraday cups, the 'Q' meter, a synchrotron light monitor, and electron beam position monitors. This paper focuses on the use of the electron beam position monitors to measure electron trajectories in the injector transport lines and the booster ring. The design of the beam position monitors is described in another paper to be presented at this conference. There are three different beam position monitor systems in the injector. One system consists of a set of five BPMs located on the injection transport line from the linac to the booster (known as the LTB line). There is a second system of six BPMs located on the ejection transport line (known as the BTS line). Finally, there is an array of 40 BPMs installed on the main booster ring itself. This article describes the software and processing electronics of the systems used to measure electron beam trajectories for the new SSRL injector for SPEAR

  4. User interface design and system integration aspects of core monitoring systems

    International Nuclear Information System (INIS)

    Berg, O.; Bodal, T.; Hornaes, A.; Porsmyr, J.

    2000-01-01

    The present paper describes our experience with the SCORPIO core monitoring system using generic building blocks for the MMI and system integration. In this context the different layers of the software system are discussed starting with the communication system, interfacing of various modules (e.g. physics codes), administration of several modules and generation of graphical user interfaces for different categories of end-users. A method by which re-use of software components can make the system development and maintenance more efficient is described. Examples are given from different system installation projects. The methodology adopted is considered particularly important in the future, as it is anticipated that core monitoring systems will be expanded with new functions (e.g. information from technical specifications, procedures, noise analysis, etc). Further, efficient coupling of off-line tools for core physics calculations and on-line modules in core monitoring can pave the way for cost savings. (authors)

  5. Application of geographic information system as a tool for environmental monitoring in support of a nuclear installation

    International Nuclear Information System (INIS)

    Ribeiro, Glaucielen F.; Silva, Nivaldo C.; Oliveira, Alexandre P.; Ferrari, Talita N.; Dias, Danila C.; Alberti, Heber Luiz C.

    2013-01-01

    The increasing advance of technologies of geographic information systems (GIS), computer processing techniques, and the growing volume of spatial data available and demand for automated systems to aid decision making are motivating enterprises and research institutions to make use of GIS technologies and Intelligent Computing. In this context, the Laboratory of Pocos de Caldas (LAPOC) has a large collection of data that are generated from environmental monitoring of a nuclear installation. These data can be organized through a georeferenced database in order to improve the quality of information, in addition to generating new interpretations from data and existing products. Therefore, this study aims to generate a database that is capable of gathering existing data into a Geographic Information System (GIS) platform using ArcGIS 9.3.1 software which has a model of relational database that stores geographic data in Geodatabase format. The steps of this process start with the organization of spatial and descriptive data, moving through logic and conceptual modeling and finally, implementation of the database into the GIS environment. The data modeling through the Geodatabase was adequate since its structure enabled the data work to be done in an efficient manner in addition to allowing centralized management of such data. This demonstrates the great potential of the tool and improvement of the quality and availability of information. (author)

  6. The Management System for Nuclear Installations (Russian Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  7. The Management System for Nuclear Installations Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  8. Monitoring and Assessment of Military Installation Land Condition under Training Disturbance Using Remote Sensing

    Science.gov (United States)

    Rijal, Santosh

    Various military training activities are conducted in more than 11.3 million hectares of land (> 5,500 training sites) in the United States (U.S.). These training activities directly and indirectly degrade the land. Land degradation can impede continuous military training. In order to sustain long term training missions and Army combat readiness, the environmental conditions of the military installations need to be carefully monitored and assessed. Furthermore, the National Environmental Policy Act of 1969 (NEPA) and the U.S. Army Regulation 200-2 require the DoD to minimize the environmental impacts of training and document the environmental consequences of their actions. To achieve these objectives, the Department of Army initiated an Integrated Training Area Management (ITAM) program to manage training lands through assessing their environmental requirements and establishing policies and procedures to achieve optimum, sustainable use of training lands. One of the programs under ITAM, Range and Training Land Assessment (RTLA) was established to collect field-based data for monitoring installation's environmental condition. Due to high cost and inefficiencies involved in the collection of field data, the RTLA program was stopped in several military installations. Therefore, there has been a strong need to develop an efficient and low cost remote sensing based methodology for assessing and monitoring land conditions of military installations. It is also important to make a long-term assessment of installation land condition for understanding cumulative impacts of continuous military training activities. Additionally, it is unclear that compared to non-military land condition, to what extent military training activities have led to the degradation of land condition for military installations. The first paper of this dissertation developed a soil erosion relevant and image derived cover factor (ICF) based on linear spectral mixture (LSM) analysis to assess and

  9. Monitoring with new microprocessor cuts cost of control system

    Energy Technology Data Exchange (ETDEWEB)

    Maehling, K L

    1985-08-01

    Programmable logic controllers (PLC) were originally developed as an alternative to relays, counters and timers for sequential and interlock control systems. They are now also used as part of distributive control systems which include diagnostic monitoring functions. The paper describes how a wiring scheme can be simplified and installation costs reduced by incorporating a newly-developed microprocessor-based monitoring device as an interface between remote devices and a PLC. An industrial application, the 400 tph coal handling facility at Bowater Southern Paper Co's mill in Calhoun, Tennessee, is considered. The control system design is outlined, the micro-monitor is described and the benefits of simplicity are stated in the paper.

  10. Installation of the first Distributed Energy Storage System (DESS) at American Electric Power (AEP).

    Energy Technology Data Exchange (ETDEWEB)

    Nourai, Ali (American Electric Power Company, Columbus, OH)

    2007-06-01

    AEP studied the direct and indirect benefits, strengths, and weaknesses of distributed energy storage systems (DESS) and chose to transform its entire utility grid into a system that achieves optimal integration of both central and distributed energy assets. To that end, AEP installed the first NAS battery-based, energy storage system in North America. After one year of operation and testing, AEP has concluded that, although the initial costs of DESS are greater than conventional power solutions, the net benefits justify the AEP decision to create a grid of DESS with intelligent monitoring, communications, and control, in order to enable the utility grid of the future. This report details the site selection, construction, benefits and lessons learned of the first installation, at Chemical Station in North Charleston, WV.

  11. Standard-E hydrogen monitoring system shop acceptance test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, T.C.

    1997-10-02

    The purpose of this report is to document that the Standard-E Hydrogen Monitoring Systems (SHMS-E), fabricated by Mid-Columbia Engineering (MCE) for installation on the Waste Tank Farms in the Hanford 200 Areas, are constructed as intended by the design. The ATP performance will verify proper system fabrication.

  12. Standard-E hydrogen monitoring system shop acceptance test report

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The purpose of this report is to document that the Standard-E Hydrogen Monitoring Systems (SHMS-E), fabricated by Mid-Columbia Engineering (MCE) for installation on the Waste Tank Farms in the Hanford 200 Areas, are constructed as intended by the design. The ATP performance will verify proper system fabrication

  13. Application of toxicity monitor using nitrifying bacteria biosensor to sewerage systems.

    Science.gov (United States)

    Inui, T; Tanaka, Y; Okayas, Y; Tanaka, H

    2002-01-01

    Toxic substances may be included in wastewater influent and can damage biological processing of wastewater treatment, therefore continuous toxic-monitoring of wastewater influent is needed. This paper describes the potential toxic-monitoring applications of the toxicity monitor using a nitrifying bacteria biosensor to sewerage systems. The results of sensitivity tests show that aspects of wastewater do not affect the sensor sensitivity and confirm that the sensor can be applied to wastewater monitoring as it is. The monitor with a prototype of filtration system installed in a wastewater treatment plant is able to operate continuously for one month at least after the modification of filtration system and the optimization of operation conditions.

  14. Reactor inventory monitoring system for Angra-1 reactor

    International Nuclear Information System (INIS)

    S Neto, Joaquim A.; Silva, Marcos C.; Pinheiro, Ronaldo F.M.; Soares, Milton; Martinez, Aquilino; Comerlato, Cesar A.; Oliveira, Eugenio A.

    1996-01-01

    This work describes the project of Reactor Inventory Monitoring System, which will be installed in Angra I Nuclear Power Plant. The inventory information is important to the operators take corrective actions in case of an incident that may cause a failure in the core cooling. (author)

  15. Remote inspection system for components installed inside a primary containment vessel of a boiling water reactor

    International Nuclear Information System (INIS)

    Shimizu, Katsutoshi; Kawai, Katsumi; Ito, Takahiko; Hashimoto, Yuji; Tomizawa, Fumio.

    1983-01-01

    A remote operation type monitoring system was developed to always enable the watching of the condition of the main equipment installed in the containment vessels of BWRs. It comprises four inspection vehicles suspended by a monorail and pulled with trolley chain, coaxial cables for signal transmission and power supply, and control system. On the inspection vehicles, a television camera, a thermometer, a microphone and a radiation dose rate meter are installed. The performance of the system was confirmed at 60 deg C for several months. Thereafter, the field test was carried out in the Tokai No. 2 Power Station, Japan Atomic Power Co., from December, 1980, to September, 1981. By the continuous monitoring and grasp of operational condition, the preventive maintenance and the improvement of the rate of operation can be expected. Also it is desirable in view of the reduction of radiation exposure of operators. The mechanization of and the labor saving in inspection and maintenance works is necessary because skilled workers will be short. The design and the composition of the system and its tests are reported. (Kako, I.)

  16. Radiation Monitoring System in Advanced Spent Fuel Conditioning Process Facility

    Energy Technology Data Exchange (ETDEWEB)

    You, Gil Sung; Kook, D. H.; Choung, W. M.; Ku, J. H.; Cho, I. J.; You, G. S.; Kwon, K. C.; Lee, W. K.; Lee, E. P

    2006-09-15

    The Advanced spent fuel Conditioning Process is under development for effective management of spent fuel by converting UO{sub 2} into U-metal. For demonstration of this process, {alpha}-{gamma} type new hot cell was built in the IMEF basement . To secure against radiation hazard, this facility needs radiation monitoring system which will observe the entire operating area before the hot cell and service area at back of it. This system consists of 7 parts; Area Monitor for {gamma}-ray, Room Air Monitor for particulate and iodine in both area, Hot cell Monitor for hot cell inside high radiation and rear door interlock, Duct Monitor for particulate of outlet ventilation, Iodine Monitor for iodine of outlet duct, CCTV for watching workers and material movement, Server for management of whole monitoring system. After installation and test of this, radiation monitoring system will be expected to assist the successful ACP demonstration.

  17. Radiation Monitoring System in Advanced Spent Fuel Conditioning Process Facility

    International Nuclear Information System (INIS)

    You, Gil Sung; Kook, D. H.; Choung, W. M.; Ku, J. H.; Cho, I. J.; You, G. S.; Kwon, K. C.; Lee, W. K.; Lee, E. P.

    2006-09-01

    The Advanced spent fuel Conditioning Process is under development for effective management of spent fuel by converting UO 2 into U-metal. For demonstration of this process, α-γ type new hot cell was built in the IMEF basement . To secure against radiation hazard, this facility needs radiation monitoring system which will observe the entire operating area before the hot cell and service area at back of it. This system consists of 7 parts; Area Monitor for γ-ray, Room Air Monitor for particulate and iodine in both area, Hot cell Monitor for hot cell inside high radiation and rear door interlock, Duct Monitor for particulate of outlet ventilation, Iodine Monitor for iodine of outlet duct, CCTV for watching workers and material movement, Server for management of whole monitoring system. After installation and test of this, radiation monitoring system will be expected to assist the successful ACP demonstration

  18. Computer systems for nuclear installation data control

    International Nuclear Information System (INIS)

    1987-09-01

    The computer programs developed by Divisao de Instalacoes Nucleares (DIN) from Brazilian CNEN for data control on nuclear installations in Brazil are presented. The following computer programs are described: control of registered companies, control of industrial sources, irradiators and monitors; control of liable person; control of industry irregularities; for elaborating credence tests; for shielding analysis; control of waste refuge [pt

  19. Delta count-rate monitoring system

    International Nuclear Information System (INIS)

    Van Etten, D.; Olsen, W.A.

    1985-01-01

    A need for a more effective way to rapidly search for gamma-ray contamination over large areas led to the design and construction of a very sensitive gamma detection system. The delta count-rate monitoring system was installed in a four-wheel-drive van instrumented for environmental surveillance and accident response. The system consists of four main sections: (1) two scintillation detectors, (2) high-voltage power supply amplifier and single-channel analyzer, (3) delta count-rate monitor, and (4) count-rate meter and recorder. The van's 6.5-kW generator powers the standard nuclear instrument modular design system. The two detectors are mounted in the rear corners of the van and can be run singly or jointly. A solid-state bar-graph count-rate meter mounted on the dashboard can be read easily by both the driver and passenger. A solid-state strip chart recorder shows trends and provides a permanent record of the data. An audible alarm is sounded at the delta monitor and at the dashboard count-rate meter if a detected radiation level exceeds the set background level by a predetermined amount

  20. The unrest of the San Miguel volcano (El Salvador, Central America): installation of the monitoring network and observed volcano-tectonic ground deformation

    Science.gov (United States)

    Bonforte, Alessandro; Hernandez, Douglas Antonio; Gutiérrez, Eduardo; Handal, Louis; Polío, Cecilia; Rapisarda, Salvatore; Scarlato, Piergiorgio

    2016-08-01

    On 29 December 2013, the Chaparrastique volcano in El Salvador, close to the town of San Miguel, erupted suddenly with explosive force, forming a column more than 9 km high and projecting ballistic projectiles as far as 3 km away. Pyroclastic density currents flowed to the north-northwest side of the volcano, while tephras were dispersed northwest and north-northeast. This sudden eruption prompted the local Ministry of Environment to request cooperation with Italian scientists in order to improve the monitoring of the volcano during this unrest. A joint force, made up of an Italian team from the Istituto Nazionale di Geofisica e Vulcanologia and a local team from the Ministerio de Medio Ambiente y Recursos Naturales, was organized to enhance the volcanological, geophysical and geochemical monitoring system to study the evolution of the phenomenon during the crisis. The joint team quickly installed a multiparametric mobile network comprising seismic, geodetic and geochemical sensors (designed to cover all the volcano flanks from the lowest to the highest possible altitudes) and a thermal camera. To simplify the logistics for a rapid installation and for security reasons, some sensors were colocated into multiparametric stations. Here, we describe the prompt design and installation of the geodetic monitoring network, the processing and results. The installation of a new ground deformation network can be considered an important result by itself, while the detection of some crucial deforming areas is very significant information, useful for dealing with future threats and for further studies on this poorly monitored volcano.

  1. Advanced dust monitoring system applied to new TRU handling facility of JAERI

    International Nuclear Information System (INIS)

    Yabuta, H.; Shigeta, Y.; Sawahata, K.; Hasegawa, K.

    1993-01-01

    In JAERI, a large, scale multipurpose facility is under construction, which consists of a TRU waste management testing installation, a solution fuel treatment installation and critical assemblies with uranium and/or plutonium solution fuel. The facility is also equipped with a lot of gloveboxes for handling and treatment of solution fuel and hot cells for research on reprocessing process. As there may be a relatively high potential of air contamination, it is important to monitor air contamination effectively and efficiently. An advanced dust monitoring system was introduced for convenience of handling and automatical measurement of filter papers, by developing a filter-holder with an IC memory and a radioactivity measuring device with an automatic filter-holder changing mechanism as a part of a centralized monitoring system with a computer

  2. Development of a Remote Monitoring System Using Meteor Burst Technology

    International Nuclear Information System (INIS)

    Ewanic, M.A.; Dunstan, M.T.; Reichhardt, D.K.

    2006-01-01

    Monitoring the cleanup and closure of contaminated sites requires extensive data acquisition, processing, and storage. At remote sites, the task of monitoring often becomes problematical due to the lack of site infrastructure (i.e., electrical power lines, telephone lines, etc.). MSE Technology Applications, Inc. (MSE) has designed an economical and efficient remote monitoring system that will handle large amounts of data; process the data, if necessary; and transmit this data over long distances. Design criteria MSE considered during the development of the remote monitoring system included: the ability to handle multiple, remote sampling points with independent sampling frequencies; robust (i.e., less susceptible to moisture, heat, and cold extremes); independent of infrastructure; user friendly; economical; and easy to expand system capabilities. MSE installed and tested a prototype system at the Mike Mansfield Advanced Technology Center (MMATC), Butte, Montana, in June 2005. The system MSE designed and installed consisted of a 'master' control station and two remote 'slave' stations. Data acquired at the two slave stations were transmitted to the master control station, which then transmits a complete data package to a ground station using meteor burst technology. The meteor burst technology has no need for hardwired land-lines or man-made satellites. Instead, it uses ionized particles in the Earth's atmosphere to propagate a radio signal. One major advantage of the system is that it can be configured to accept data from virtually any type of device, so long as the signal from the device can be read and recorded by a standard data-logger. In fact, MSE has designed and built an electrical resistivity monitoring system that will be powered and controlled by the meteor burst system components. As sites move through the process of remediation and eventual closure, monitoring provides data vital to the successful long term management of the site. The remote

  3. Development of advanced secondary chemistry monitoring system for Korea nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Sang Hak; Kim, Chung Tae

    1997-01-01

    Water chemistry control is one of the most important tasks in order to maintain the reliability of plant equipments and extend the operating life of the plant. KEPCO and KOPEC developed a computerized tool for this purpose -ASCMS (advanced secondary chemistry monitoring system) which is able to monitor and diagnose the secondary water chemistry. A prototype system had been installed at KORI 3 nuclear power plant since April 1993 in order to evaluate the system performance. After the implementation of enhancements identified during the testing of the prototype, we have developed the advanced secondary monitoring system, ASCMS which is installed at 5 nuclear power plants and has been under operations since April 1997. The ASCMS comprises PC subsystem designed for data acquisition, data analysis, and data diagnosis. The ASCMS will provide overall information related to steam generator secondary side water chemistry problems and improve plant availability, reduce radiation exposure to workers, and reduce operating and maintenance costs. 6 figs

  4. A web-based three-tier control and monitoring application for integrated facility management of photovoltaic systems

    Directory of Open Access Journals (Sweden)

    Apostolos Meliones

    2014-01-01

    Full Text Available The architecture of a control system can be designed vertically with the distinction between functional levels. We adopt this layered approach for the design and implementation of a network-based control and monitoring application. In this paper we present the design and implementation of a network-based management application for controlling and monitoring the input and output data of remote equipment aiming at performance macro-observation, alarm detection, handling operation failures, installation security, access control, collection and recording of statistical data and provisioning of reports. The main services provided to the user and operating over the public internet and/or mobile network include control, monitoring, notification, reporting and data export. Our proposed system consists of a front-end for field (site-level control and monitoring as well as a service back-end which undertakes to collect, store and manage data from all remote installations. Hierarchical data acquisition methodology and performance macro-observation are according to the IEC 61724 standard. We have successfully used our control and monitoring application for integrated facility management of photovoltaic plant installations; nevertheless it can be easily migrated to other renewable energy generation installations and remote automation applications in general.

  5. Fiscal year 1994 well installation program summary report, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-09-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1994 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two monitoring wells were installed and one piezometer installation was attempted, but not completed, during the FY 1994 drilling program. In addition, SAIC provided health and safety and geotechnical oversight for two soil borings in support of the Y-12 Underground Storage Tank (UST) Program. All new monitoring wells were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific indicator parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance. All well installation was conducted following industry-standard methods and approved procedures in the Environment Surveillance Procedures Quality Control Program (Energy Systems 1988), the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1986), and Guidelines for Installation of Monitor Wells at the Y-12 Plant (Geraghty and Miller 1985). Health and safety monitoring and field screening of drilling returns and development waters were conducted in accordance with approved Martin Marietta Energy Systems, Inc. (Energy Systems) guidelines. All of the monitoring wells installed during FY 1994 at the Y-12 Plant were of screened construction

  6. Measurement-Based Evaluation of Installed Filtration System Performance in Single-Family Homes

    Energy Technology Data Exchange (ETDEWEB)

    Chan, Wanyu Rengie; Singer, Brett C.

    2014-04-03

    This guide discusses important study design issues to consider when conducting an on-site evaluation of filtration system performance. The two most important dichotomies to consider in developing a study protocol are (1) whether systems are being evaluated in occupied or unoccupied homes and (2) whether different systems are being compared in the same homes or if the comparison is between systems installed in different homes. This document provides perspective and recommendations about a suite of implementation issues including the choice of particle measurement devices, selection of sampling locations, ways to control and/or monitor factors and processes that can impact particle concentrations, and data analysis approaches.

  7. Monitoring of standalone photovoltaic systems applied to rural electrification areas; Avaliacao de desempenho e identificacao de falhas em sistemas fotovoltaicos isolados aplicados a eletrificacao rural

    Energy Technology Data Exchange (ETDEWEB)

    Machado-Neto, L. V. B.; Cabral, C. V. T.; Oliveira-Filho, D.; Diniz, A. s. A. C.

    2004-07-01

    The sustainability of standalone photovoltaic systems passes through an accompaniment of the systems installed in the field. To subsidize this accompaniment it had been developed procedures for monitoring a similar system in laboratory. The standalone photovoltaic system monitored is similar to the systems installed by Companhia Energetica de Minas Gerais - CEMIG in the schools of isolated communities, inside the Solar Light Program. The system was simulated and the aims were to optimize the project and carry out a comparative study with the monitored results. The assembly procedure of the facility consisted of the implantation of the sensors, installation of acquisition boards and development of the monitoring program. The results presented here will allow the development of a program of preventive maintenance of the systems installed by CEMIG. (Author)

  8. Remote monitoring of solar and wind power installation via GSN and Internet; Sistema de telegestion de instalaciones solares y eolicas a traves de GSN e Internet

    Energy Technology Data Exchange (ETDEWEB)

    Caballero, P. M. L.; Valmaseda, J. C. T.; Uruena, H. J. C.; Bujedo, L. A. N.

    2004-07-01

    Remote monitoring of solar and wind power installations is important for installers since some local rules oblige them to keep a maintenance plan, and the installations are normally sparse. It is also important for end users because they demand more information about the system and management capacity each time. In this paper we present CARTIF's development for the company ENERPAL to fulfil these needs. It is formed by two subsystems: one for data acquisition and control of the installations via GSM, and the other, a server software that allows the user to access her installation remotely through the Internet in order to manage it. (Author)

  9. Monitoring of debris flows and landslides by wired and wireless systems. Experiences from the Catalan Pyrenees.

    Science.gov (United States)

    Hürlimann, Marcel; Abancó, Clàudia; Moya, José; Vilajosana, Ignasi; Llosa, Jordi

    2013-04-01

    Sophisticated monitoring of landslides for research purpose has started in the 1990thies in the Catalan Pyrenees. Since then several types of mass movements (large landslides, debris flows, shallow landslides and rock falls) and multiples techniques have been applied. In this contribution, special attention will be given to the debris-flow monitoring system installed since summer 2009 in the Rebaixader catchment, Central Pyrenees. The monitoring system has continuously been improved during the last years and nowadays includes devices studying the three major aspects: 1) initiation, 2) flow dynamics, and 3) accumulation. While some parts of the monitoring network include a traditional wired system, the newer parts were installed using low-power wireless devices. Two major aspects will be discussed. First, results of the Rebaixader monitoring site will be presented. Second, experience regarding the monitoring will be evaluated focussing on technical aspects and the comparison between wired and wireless techniques. In the Rebaixader catchment, 6 debris flows and 11 debris floods were observed between August 2009 and October 2012. Surprisingly, also 4 major rock falls were recorded. The rainfall analysis shows that the debris flows were triggered by short, high-intensity rainstorms with a preliminary threshold of about 15 mm during 1 hour. In addition, there was observed a positive trend between event volume and rainfall amount or intensity. The analysis of the ground vibration signals shows significant differences between the time series recorded at the different geophones. These differences are associated with the geophone location in the channel (distance and material), the mounting or the data acquisition system. For instance, the most downstream geophone, installed in bedrock, shows the clearest debris-flows vibration time series, while the uppermost is the most reliable regarding the detection of rockfalls. An evaluation of wired versus wireless monitoring

  10. Work plan for ground water elevation data recorder/monitor well installation at Gunnison, Colorado

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the Gunnison, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between ground water and surface water in the area. Data collection objectives (DCO) identify reasons for collecting data. The following are DCOs for the Gunnison ground water elevation data recorder/monitor well installation project: long-term continuous ground water level data and periodic ground water samples will be collected to better understand the relationship between surface and ground water at the site; water level and water quality data will eventually be used in future ground water modeling to more firmly establish boundary conditions in the vicinity of the Gunnison processing site; and modeling results will be used to demonstrate and document the potential remedial alternative of natural flushing

  11. The Westinghouse BEACON on-line core monitoring system

    International Nuclear Information System (INIS)

    Buechel, Robert J.; Boyd, William A.; Casadei, Alberto L.

    1995-01-01

    BEACON (Best Estimate Analysis of Core Operations - Nuclear), a core monitoring and operational support package developed by Westinghouse, has been installed at many operating PWRs worldwide. The BEACON system is a real-time monitoring system which can be used in plants with both fixed and movable incore detector systems and utilizes an on-line nodal model combined with core instrumentation data to provide continuous core power distribution monitoring. In addition, accurate core-predictive capabilities utilizing a full core nodal model updated according to plant operating history can be made to provide operational support. Core history information is kept and displayed to help operators anticipate core behavior and take pro-active control actions. The BEACON system has been licensed by the U.S. Nuclear Regulatory Commission for direct, continuous monitoring of DNBR and peak linear heat rate. This allows BEACON to be integrated into the plant technical specifications to permit significant relaxation of operating limitations defined by conventional technical specifications. (author). 4 refs, 2 figs, 1 tab

  12. Monitoring support system for nuclear power plant

    International Nuclear Information System (INIS)

    Higashikawa, Yuichi; Kubota, Rhuji; Tanaka, Keiji; Takano, Yoshiyuki

    1996-01-01

    The nuclear power plants in Japan reach to 49 plants and supply 41.19 million kW in their installed capacities, which is equal to about 31% of total electric power generation and has occupied an important situation as a stable energy supplying source. As an aim to keeping safe operation and working rate of the power plants, various monitoring support systems using computer technology, optical information technology and robot technology each advanced rapidly in recent year have been developed to apply to the actual plants for a plant state monitoring system of operators in normal operation. Furthermore, introduction of the emergent support system supposed on accidental formation of abnormal state of the power plants is also investigated. In this paper, as a monitoring system in the recent nuclear power plants, design of control panel of recent central control room, introduction to its actual plant and monitoring support system in development were described in viewpoints of improvement of human interface, upgrade of sensor and signal processing techniques, and promotion of information service technique. And, trend of research and development of portable miniature detector and emergent monitoring support system are also introduced in a viewpoint of labor saving and upgrade of the operating field. (G.K.)

  13. A high reliability oxygen deficiency monitoring system

    International Nuclear Information System (INIS)

    Parry, R.; Claborn, G.; Haas, A.; Landis, R.; Page, W.; Smith, J.

    1993-05-01

    The escalating use of cryogens at national laboratories in general and accelerators in particular, along with the increased emphasis placed on personnel safety, mandates the development and installation of oxygen monitoring systems to insure personnel safety in the event of a cryogenic leak. Numerous vendors offer oxygen deficiency monitoring systems but fail to provide important features and/or flexibility. This paper describes a unique oxygen monitoring system developed for the Magnet Test Laboratory (MTL) at the Superconducting Super Collider Laboratory (SSCL). Features include: high reliability, oxygen cell redundancy, sensor longevity, simple calibration, multiple trip points, offending sensor audio and visual indication, global alarms for building evacuation, local and remote analog readout, event and analog data logging, EMAIL event notification, phone line voice status system, and multi-drop communications network capability for reduced cable runs. Of particular importance is the distributed topology of the system which allows it to operate in a stand-alone configuration or to communicate with a host computer. This flexibility makes it ideal for small applications such as a small room containing a cryogenic dewar, as well as larger systems which monitor many offices and labs in several buildings

  14. A high reliability oxygen deficiency monitoring system

    International Nuclear Information System (INIS)

    Parry, R.; Claborn, G.; Haas, A.; Landis, R.; Page, W.; Smith, J.

    1993-01-01

    The escalating use of cryogens at national laboratories in general and accelerators in particular, along with the increased emphasis placed on personnel safety, mandates the development and installation of oxygen monitoring systems to insure personnel safety in the event of a cryogenic leak. Numerous vendors offer oxygen deficiency monitoring systems but fail to provide important features and/or flexibility. This paper describes a unique oxygen monitoring system developed for the Magnet Test Laboratory (MTL) at the Superconducting Super Collider Laboratory (SSCL). Features include: high reliability, oxygen cell redundancy, sensor longevity, simple calibration, multiple trip points, offending sensor audio and visual indication, global alarms for building evacuation, local and remote analog readout, event and analog data logging, EMAIL event notification, phone line voice status system, and multi-drop communications network capability for reduced cable runs. Of particular importance is the distributed topology of the system which allows it to operate in a stand-alone configuration or to communicate with a host computer. This flexibility makes it ideal for small applications such as a small room containing a cryogenic dewar, as well as larger systems which monitor many offices and labs in several buildings

  15. FLUES - A new monitoring system for leak detection and location

    International Nuclear Information System (INIS)

    Jax, P.; Streicher, V.

    1995-01-01

    A new Leakage Monitoring and Location System with high sensitivity was developed and tested by Siemens during the last years. Now this system has been installed in a Nuclear Power Plant. The experiences gained during the qualification test and the first months of operation can be reported. (author)

  16. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  17. International Remote Monitoring Project Embalse Nuclear Power Station, Argentina Embalse Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, Sigfried L.; Glidewell, Donnie D.; Bonino, Anibal; Bosler, Gene; Mercer, David; Maxey, Curt; Vones, Jaromir; Martelle, Guy; Busse, James; Kadner, Steve; White, Mike; Rovere, Luis

    1999-01-01

    The Autoridad Regulatoria Nuclear of Argentina (ARN), the International Atomic Energy Agency (IAEA), ABACC, the US Department of Energy, and the US Support Program POTAS, cooperated in the development of a Remote Monitoring System for nuclear nonproliferation efforts. This system was installed at the Embalse Nuclear Power Station last year to evaluate the feasibility of using radiation sensors in monitoring the transfer of spent fuel from the spent fuel pond to dry storage. The key element in this process is to maintain continuity of knowledge throughout the entire transfer process. This project evaluated the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguard efficiency. New technology has been developed to enhance the design of the system to include storage capability on board sensor platforms. This evaluation has led to design enhancements that will assure that no data loss will occur during loss of RF transmission of the sensors

  18. Health and usage monitoring system for the small aircraft composite structure

    Science.gov (United States)

    Růžička, Milan; Dvořák, Milan; Schmidová, Nikola; Šašek, Ladislav; Štěpánek, Martin

    2017-07-01

    This paper is focused on the design of the health and usage monitoring system (HUMS) of the composite ultra-light aircrafts. A multichannel measuring system was developed and installed for recording of the long-term operational measurements of the UL airplane. Many fiber Bragg grating sensors were implemented into the composite aircraft structure, mainly in the glue joints. More than ten other analog functions and signals of the aircraft is monitored and can be correlated together. Changing of the FBG sensors responses in monitored places and their correlations, comparing with the calibration and recalibration procedures during a monitored life may indicate damage (eg. in bonded joints) and complements the HUMS system.

  19. PAMTRAK: A system to monitor high value objects and personnel in restricted areas

    International Nuclear Information System (INIS)

    Anspach, D.A.; Walters, B.G.; Anspach, J.P.; Crain, B. Jr.

    1996-01-01

    The US Department of Energy (DOE) uses sensitive or classified parts and material that must be protected and accounted for. The authors believe there is a need for an automated system that can help protect and monitor these parts and material. In response to this need Sandia National Laboratories (SNL) has developed a real-time personnel and material tracking system called PAMTRAK that has been installed at selected DOE facilities. PAMTRAK safeguards sensitive parts and material by tracking tags worn by personnel and by monitoring sensors attached to the parts or material. This paper describes the goals when designing PAMTRAK, the PAMTRAK system components, the current installations, and the benefits a site can expect when using PAMTRAK

  20. The Wettzell System Monitoring Concept and First Realizations

    Science.gov (United States)

    Ettl, Martin; Neidhardt, Alexander; Muehlbauer, Matthias; Ploetz, Christian; Beaudoin, Christopher

    2010-01-01

    Automated monitoring of operational system parameters for the geodetic space techniques is becoming more important in order to improve the geodetic data and to ensure the safety and stability of automatic and remote-controlled observations. Therefore, the Wettzell group has developed the system monitoring software, SysMon, which is based on a reliable, remotely-controllable hardware/software realization. A multi-layered data logging system based on a fanless, robust industrial PC with an internal database system is used to collect data from several external, serial, bus, or PCI-based sensors. The internal communication is realized with Remote Procedure Calls (RPC) and uses generative programming with the interface software generator idl2rpc.pl developed at Wettzell. Each data monitoring stream can be configured individually via configuration files to define the logging rates or analog-digital-conversion parameters. First realizations are currently installed at the new laser ranging system at Wettzell to address safety issues and at the VLBI station O Higgins as a meteorological data logger. The system monitoring concept should be realized for the Wettzell radio telescope in the near future.

  1. Geological hazard monitoring system in Georgia

    Science.gov (United States)

    Gaprindashvili, George

    2017-04-01

    Georgia belongs to one of world's most complex mountainous regions according to the scale and frequency of Geological processes and damage caused to population, farmlands, and Infrastructure facilities. Geological hazards (landslide, debrisflow/mudflow, rockfall, erosion and etc.) are affecting many populated areas, agricultural fields, roads, oil and gas pipes, high-voltage electric power transmission towers, hydraulic structures, and tourist complexes. Landslides occur almost in all geomorphological zones, resulting in wide differentiation in the failure types and mechanisms and in the size-frequency distribution. In Georgia, geological hazards triggered by: 1. Activation of highly intense earthquakes; 2. Meteorological events provoking the disaster processes on the background of global climatic change; 3. Large-scale Human impact on the environment. The prediction and monitoring of Geological Hazards is a very wide theme, which involves different researchers from different spheres. Geological hazard monitoring is essential to prevent and mitigate these hazards. In past years in Georgia several monitoring system, such as Ground-based geodetic techniques, Debrisflow Early Warning System (EWS) were installed on high sensitive landslide and debrisflow areas. This work presents description of Geological hazard monitoring system in Georgia.

  2. The ATLAS software installation system for LCG/EGEE

    Energy Technology Data Exchange (ETDEWEB)

    Salvo, A D [Istituto Nazionale di Fisica Nucleare, sez. Roma 1 (Italy); Barchiesi, A [Universita di Roma I ' La Sapienza' (Italy); Gnanvo, K [Queen Mary and Westfield College (United Kingdom); Gwilliam, C [University of Liverpool (United Kingdom); Kennedy, J; Krobath, G [Ludwig-Maximilians-Universitaet Muenchen (Germany); Olszewski, A [Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences (Poland); Rybkine, G [Royal Holloway College (United Kingdom)

    2008-07-15

    The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within a few hours, have driven the need for an automatic installation system for the LHC experiments. In this work we describe the ATLAS system for the experiment software installation in LCG/EGEE, based on the Light Job Submission Framework for Installation (LJSFi), an independent job submission framework for generic submission and job tracking in EGEE. LJSFi is able to automatically discover, check, install, test and tag the full set of resources made available in LCG/EGEE to the ATLAS Virtual Organization in a few hours, depending on the site availability.

  3. Application of network technology to Remote Monitoring System

    International Nuclear Information System (INIS)

    Johnson, C.S.; Sorokowski, D.L.; Veevers, K.

    1994-01-01

    The Australian Safeguards Office (ASO) and the US Department of Energy (DOE) have sponsored work under a bilateral agreement to implement a Remote Monitoring System (RMS) at an Australian nuclear site operated by the Australian Nuclear Science and Technology Organization (ANSTO). The RMS, designed by Sandia National Laboratories (SNL), was installed in February 1994 at the Dry Spent Fuel Storage Facility (DSFSF) located at Lucas Heights, Australia. The RMS was designed to test a number of different concepts that would be useful for unattended remote monitoring activities. The DSFSF located in Building 27 is a very suitable test site for a RMS. The RMS uses a network of low cost nodes to collect data from a number of different sensors and security devices. Different sensors and detection devices have been installed to study how they can be used to complement each other for C/S applications. The data collected from the network will allow a comparison of how the various types of sensors perform under the same set of conditions. A video system using digital compression collects digital images and stores them on a hard drive and a digital optical disk. Data and images from the storage area are remotely monitored via telephone from Canberra, Australia and Albuquerque, NM, USA. These remote monitoring stations operated by ASO and SNL respectively, can retrieve data and images from the RMS computer at the DSFSF. The data and images are encrypted before transmission. The Remote Monitoring System field tests have been operational for six months with good test results. Sensors have performed well and the digital images have excellent resolution. The hardware and software have performed reliably without any major difficulties. This paper summarizes the highlights of the prototype system and the ongoing field tests

  4. Development of automated patrol-type monitoring and inspection system for nuclear power plant and application to actual plant

    International Nuclear Information System (INIS)

    Senoo, Makoto; Koga, Kazunori; Hirakawa, Hiroshi; Tanaka, Keiji

    1996-01-01

    An automated patrol-type monitoring and inspection system was developed and applied in a nuclear power plant. This system consists of a monorail, a monitoring robot and an operator's console. The monitoring robot consists of a sensor unit and a control unit. Three kinds of sensor, a color ITV camera, an infrared camera and a microphone are installed in the sensor unit. The features of this monitoring robot are; (1) Weights 15 kg with a cross-sectional dimensions of 152 mm width and 290 mm height. (2) Several automatic monitoring functions are installed using image processing and frequency analysis for three sensor signals. (author)

  5. The underwater installation of a drained geomembrane system on Lost Creek Dam

    International Nuclear Information System (INIS)

    Onken, S.; Harlan, R.C.; Wilkes, J.; Vaschetti, G.

    1998-01-01

    Lost Creek Dam was constructed in California around 1923. It is a 122 foot high concrete arch dam with a crest elevation of 3,287 feet and a crest length of 490 feet. Over the years, the dam and the condition of the concrete face have deteriorated. The concrete is porous and seeps water along the entire downstream face. In winter, the seeping water freezes, penetrates the concrete and causes expansion and spalling of the concrete surface. In some places, the concrete has very low strength to a depth of a foot or more, rendering the dam only marginally safe. Seven mitigative measures were identified as possible solutions to the problem. It was determined that the seepage of the water through the concrete dam could be stopped with the installation of a geomembrane to the upstream face. This paper describes the unique underwater installation of a drained geomembrane system on the concrete face of the dam. This was the first ever installation of a drained geomembrane system on an entire dam using divers. Monitoring will determine the success of the project, and whether the seepage of the water through the porous concrete had been reduced sufficiently to stop the deterioration of the concrete on the downstream face. 2 refs., 12 figs

  6. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    CERN Document Server

    De Salvo, Alessandro; The ATLAS collaboration; Sanchez, Arturo; Smirnov, Yuri

    2015-01-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  7. Structural health monitoring system of soccer arena based on optical sensors

    Science.gov (United States)

    Shishkin, Victor V.; Churin, Alexey E.; Kharenko, Denis S.; Zheleznova, Maria A.; Shelemba, Ivan S.

    2014-05-01

    A structural health monitoring system based on optical sensors has been developed and installed on the indoor soccer arena "Zarya" in Novosibirsk. The system integrates 119 fiber optic sensors: 85 strain, 32 temperature and 2 displacement sensors. In addition, total station is used for measuring displacement in 45 control points. All of the constituents of the supporting structure are subjects for monitoring: long-span frames with under floor ties, connections, purlins and foundation.

  8. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  9. Toyota Prius Hybrid Plug-in Conversation and Battery Monitoring system

    Science.gov (United States)

    Unnikannan, Krishnanunni; McIntyre, Michael; Harper, Doug; Kessinger, Robert; Young, Megan; Lantham, Joseph

    2012-03-01

    The objective of the project was to analyze the performance of a Toyota Hybrid. We started off with a stock Toyota Prius and taking data by driving it in city and on the highway in a mixed pre-determined route. The batteries can be charged using standard 120V AC outlets. First phase of the project was to increase the performance of the car by installing 20 Lead (Pb) batteries in a plug-in kit. To improve the performance of the kit, a centralized battery monitoring system was installed. The battery monitoring system has two components, a custom data modules and a National Instruments CompactRIO. Each Pb battery has its own data module and all the data module are connected to the CompactRIO. The CompactRIO records differential voltage, current and temperature from all the 20 batteries. The LabVIEW software is dynamic and can be reconfigured to any number of batteries and real time data from the batteries can be monitored on a LabVIEW enabled machine.

  10. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    Science.gov (United States)

    De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.

    2015-12-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.

  11. An earth anchor system: installation and design guide.

    Science.gov (United States)

    R.L. Copstead; D.D. Studier

    1990-01-01

    A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...

  12. Application of an automated wireless structural monitoring system for long-span suspension bridges

    International Nuclear Information System (INIS)

    Kurata, M.; Lynch, J. P.; Linden, G. W. van der; Hipley, P.; Sheng, L.-H.

    2011-01-01

    This paper describes an automated wireless structural monitoring system installed at the New Carquinez Bridge (NCB). The designed system utilizes a dense network of wireless sensors installed in the bridge but remotely controlled by a hierarchically designed cyber-environment. The early efforts have included performance verification of a dense network of wireless sensors installed on the bridge and the establishment of a cellular gateway to the system for remote access from the internet. Acceleration of the main bridge span was the primary focus of the initial field deployment of the wireless monitoring system. An additional focus of the study is on ensuring wireless sensors can survive for long periods without human intervention. Toward this end, the life-expectancy of the wireless sensors has been enhanced by embedding efficient power management schemes in the sensors while integrating solar panels for power harvesting. The dynamic characteristics of the NCB under daily traffic and wind loads were extracted from the vibration response of the bridge deck and towers. These results have been compared to a high-fidelity finite element model of the bridge.

  13. Application of AN Automated Wireless Structural Monitoring System for Long-Span Suspension Bridges

    Science.gov (United States)

    Kurata, M.; Lynch, J. P.; van der Linden, G. W.; Hipley, P.; Sheng, L.-H.

    2011-06-01

    This paper describes an automated wireless structural monitoring system installed at the New Carquinez Bridge (NCB). The designed system utilizes a dense network of wireless sensors installed in the bridge but remotely controlled by a hierarchically designed cyber-environment. The early efforts have included performance verification of a dense network of wireless sensors installed on the bridge and the establishment of a cellular gateway to the system for remote access from the internet. Acceleration of the main bridge span was the primary focus of the initial field deployment of the wireless monitoring system. An additional focus of the study is on ensuring wireless sensors can survive for long periods without human intervention. Toward this end, the life-expectancy of the wireless sensors has been enhanced by embedding efficient power management schemes in the sensors while integrating solar panels for power harvesting. The dynamic characteristics of the NCB under daily traffic and wind loads were extracted from the vibration response of the bridge deck and towers. These results have been compared to a high-fidelity finite element model of the bridge.

  14. Design of a geothermal monitoring network in a coastal area and the evaluation system

    Science.gov (United States)

    Ohan Shim, Byoung; Lee, Chulwoo; Park, Chanhee

    2016-04-01

    In Seockmodo Island (area of 48.2 km2) located at the northwest of South Korea, a renewable energy development project to install photovoltaic 136 kW and geothermal 516.3 kW is initiated. Since the 1990s, more than 20 deep geothermal wells for hot springs, greenhouse and aquaculture have been developed along coastal areas. The outflow water of each site has the pumping capacity between 300 and 4,800 m3/day with the salinity higher than 20,000 mg/l, and the maximum temperature shows 70 ?C. Because of the required additional well drillings, the increased discharge rate can cause serious seawater intrusion into freshwater aquifers, which supply groundwater for drinking and living purposes from 210 wells. In order to manage the situation, advanced management skills are required to maintain the balance between geothermal energy development and water resources protection. We designed real-time monitoring networks with monitoring stations for the sustainable monitoring of the temperature and salinity. Construction of borehole temperature monitoring for deep and shallow aquifer consists with the installation of automated temperature logging system and cellular telemetry for real-time data acquisition. The DTS (distributed temperature sensing) system and fiber optic cables will be installed for the logging system, which has enough temperature resolution and accuracy. The spatial distribution and the monitoring points can be determined by geological and hydrological situations associated with the locations of current use and planned facilities. The evaluation of the temperature and salinity variation will be conducted by the web-based monitoring system. The evaluation system will be helpful to manage the balance between the hot water development and the fresh water resources conservation.

  15. The continuous automatic monitoring network installed in Tuscany (Italy) since late 2002, to study earthquake precursory phenomena

    Science.gov (United States)

    Pierotti, Lisa; Cioni, Roberto

    2010-05-01

    Since late 2002, a continuous automatic monitoring network (CAMN) was designed, built and installed in Tuscany (Italy), in order to investigate and define the geochemical response of the aquifers to the local seismic activity. The purpose of the investigation was to identify eventual earthquake precursors. The CAMN is constituted by two groups of five measurement stations each. A first group has been installed in the Serchio and Magra graben (Garfagnana and Lunigiana Valleys, Northern Tuscany), while the second one, in the area of Mt. Amiata (Southern Tuscany), an extinct volcano. Garfagnana, Lunigiana and Mt. Amiata regions belong to the inner zone of the Northern Apennine fold-and-thrust belt. This zone has been involved in the post-collision extensional tectonics since the Upper Miocene-Pliocene. Such tectonic activity has produced horst and graben structures oriented from N-S to NW-SE that are transferred by NE-SW system. Both Garfagnana (Serchio graben) and Lunigiana (Magra graben) belong to the most inner sector of the belt where the seismic sources, responsible for the strongest earthquakes of the northern Apennine, are located (e.g. the M=6.5 earthquake of September 1920). The extensional processes in southern Tuscany have been accompanied by magmatic activity since the Upper Miocene, developing effusive and intrusive products traditionally attributed to the so-called Tuscan Magmatic Province. Mt. Amiata, whose magmatic activity ceased about 0.3 M.y. ago, belongs to the extensive Tyrrhenian sector that is characterized by high heat flow and crustal thinning. The whole zone is characterized by wide-spread but moderate seismicity (the maximum recorded magnitude has been 5.1 with epicentre in Piancastagnaio, 1919). The extensional regime in both the Garfagnana-Lunigiana and Mt. Amiata area is confirmed by the focal mechanisms of recent earthquakes. An essential phase of the monitoring activities has been the selection of suitable sites for the installation of

  16. Demonstration of a utility industry horizontal drilling system: Horizontal well AMH-5 installation report

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy's Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of VOCs in soils and groundwater at the Savannah River Site (SRS) in 1989. The overall goal of the program is demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program. Directional drilling has been shown to be a successful technique for enhancing access to the subsurface, thus improving remediation systems, especially remediation systems which perform in situ. Demonstration of an innovative directional drilling system at the Integrated Demonstration Site at the SRS, was initiated in June of 1992. The directional drilling system was designed to install an in situ remediation system. The drilling system is an experimental compaction/dry drilling technique developed by Charles Machine Works (Ditch Witch reg-sign) of Perry, Oklahoma. A horizontal well was installed in the M Area of the SRS below and parallel to an abandoned tile process sewer line. The installation of the horizontal well was a two-part process. Part one consisted of drilling the borehole, and part two was the horizontal well completion

  17. Quality assurance plan for the data acquisition and management system for monitoring the fuel oil spill at the Sandia National Laboratories installation in Livermore, California

    International Nuclear Information System (INIS)

    Peerenboom, J.P.; Leser, C.C.; Ramsey, G.M.; Widing, M.A.

    1995-04-01

    In February 1975, the accidental puncture of an underground transfer line buried about 4 ft below the ground surface at the SNL installation in Livermore, California, resulted in the release of approximately 225.5 m 3 of No. 2 diesel fuel. This report describes the formal quality assurance plan that will be used for the data acquisition and management system developed to monitor a bioremediation pilot study by Argonne National Laboratory in association with Sandia National Laboratories. The data acquisition and management system will record the site data during the bioremediation effort and assist users in site analysis. The designs of the three major subsystems of this system are described in this report. Quality assurance criteria are defined for the management, performance, and assessment of the system. Finally, the roles and responsibilities for configuration management of this system are defined for the entire life cycle of the project

  18. A dynamic system for ATLAS software installation on OSG grid sites

    International Nuclear Information System (INIS)

    Zhao, X; Maeno, T; Wenaus, T; Leuhring, F; Youssef, S; Brunelle, J; De Salvo, A; Thompson, A S

    2010-01-01

    A dynamic and reliable system for installing the ATLAS software releases on Grid sites is crucial to guarantee the timely and smooth start of ATLAS production and reduce its failure rate. In this paper, we discuss the issues encountered in the previous software installation system, and introduce the new approach, which is built upon the new development in the areas of the ATLAS workload management system (PanDA), and software package management system (pacman). It is also designed to integrate with the EGEE ATLAS software installation framework. In the new system, ATLAS software releases are packaged as pacball, a uniquely identifiable and reproducible self-installing data file. The distribution of pacballs to remote sites is managed by ATLAS data management system (DQ2) and PanDA server. The installation on remote sites is automatically triggered by the PanDA pilot jobs. The installation job payload connects to a central ATLAS software installation portal, making the information of installation status easily accessible across OSG and EGEE Grids. The issues encountered in running the new system in production, and our future plan for improvement, will also be discussed.

  19. Mobile Monitoring System for Nuclear Contamination Analysis

    International Nuclear Information System (INIS)

    Broide, A.; Sheinfeld, M.; Marcus, E.; Wengrowicz, U.; Tirosh, D.

    2002-01-01

    In case of a nuclear accident, it is essential to have extensive knowledge concerning the nature of the radioactive plume expansion, for further analysis. For this purpose a mobile monitoring system may provide important data about the plume characteristics. An advanced Mobile Monitoring System is under development at the Nuclear Research Center-Negev. The system is composed of a network of mobile stations, typically installed onboard vehicles, which transmit radiation measurements along with position information to a central station. The mobile network's communications infrastructure is based on Motorola Mobile Logic Unit devices, which are state-of-the-art reliable modems with an integrated Global Positioning System module. The radiation measurements received by the central station are transferred to a risk assessment program, which evaluates the expected hazards to the populated areas located in the estimated plume's expansion direction

  20. Installation of a groundwater monitoring-well network on the east side of the Uncompahgre River in the Lower Gunnison River Basin, Colorado, 2014

    Science.gov (United States)

    Thomas, Judith C.

    2015-10-07

    The east side of the Uncompahgre River Basin has been a known contributor of dissolved selenium to recipient streams. Discharge of groundwater containing dissolved selenium contributes to surface-water selenium concentrations and loads; however, the groundwater system on the east side of the Uncompahgre River Basin is not well characterized. The U.S. Geological Survey, in cooperation with the Colorado Water Conservation Board and the Bureau of Reclamation, has established a groundwater-monitoring network on the east side of the Uncompahgre River Basin. Thirty wells total were installed for this project: 10 in 2012 (DS 923, http://dx.doi.org/10.3133/ds923), and 20 monitoring wells were installed during April and June 2014 which are presented in this report. This report presents location data, lithologic logs, well-construction diagrams, and well-development information. Understanding the groundwater system can provide managers with an additional metric for evaluating the effectiveness of salinity and selenium control projects.

  1. Experience of MAPS in monitoring of personnel movement with on-line database management system

    International Nuclear Information System (INIS)

    Rajendran, T.S.; Anand, S.D.

    1992-01-01

    As a part of physical protection system, access control system has been installed in Madras Atomic Power Station(MAPS) to monitor and regulate the movement of persons within MAPS. The present system in its original form was meant only for security monitoring. A PC based database management system was added to this to computerize the availability of work force for actual work. (author). 2 annexures

  2. Thermal solar energy. Collective domestic hot water installations

    International Nuclear Information System (INIS)

    Garnier, Cedric; Chauvet, Chrystele; Fourrier, Pascal

    2016-01-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic outlook on the way to complete the installation of a collective domestic water solar heating system. After some recall of what is solar energy, the thermal solar technology and the energy savings it may induce, this document presents the main hydraulic configurations of a solar heating system with water storage, the dimensioning of a solar water heating system and its cost estimation, the installation and the commissioning of the system, the monitoring and maintenance operations

  3. Beam Position and Phase Monitor - Wire Mapping System

    International Nuclear Information System (INIS)

    Watkins, Heath A.; Shurter, Robert B.; Gilpatrick, John D.; Kutac, Vincent G.; Martinez, Derwin

    2012-01-01

    The Los Alamos Neutron Science Center (LANSCE) deploys many cylindrical beam position and phase monitors (BPPM) throughout the linac to measure the beam central position, phase and bunched-beam current. Each monitor is calibrated and qualified prior to installation to insure it meets LANSCE requirements. The BPPM wire mapping system is used to map the BPPM electrode offset, sensitivity and higher order coefficients. This system uses a three-axis motion table to position the wire antenna structure within the cavity, simulating the beam excitation of a BPPM at a fundamental frequency of 201.25 MHz. RF signal strength is measured and recorded for the four electrodes as the antenna position is updated. An effort is underway to extend the systems service to the LANSCE facility by replacing obsolete electronic hardware and taking advantage of software enhancements. This paper describes the upgraded wire positioning system's new hardware and software capabilities including its revised antenna structure, motion control interface, RF measurement equipment and Labview software upgrades. The main purpose of the wire mapping system at LANSCE is to characterize the amplitude response versus beam central position of BPPMs before they are installed in the beam line. The wire mapping system is able to simulate a beam using a thin wire and measure the signal response as the wire position is varied within the BPPM aperture.

  4. Installation package for a sunspot cascade solar water heating system

    Science.gov (United States)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  5. Post-accident monitoring systems in Prototype Fast Breeder Reactor

    International Nuclear Information System (INIS)

    Suriya Murthy, N.; Sivasailanathan, Vidhya; Ananth, Allu; Roy, Kallol

    2018-01-01

    PFBR is a 500 MW(e) MOX fueled and sodium cooled fast reactor (SFR) under advanced stage of commissioning at Kalpakkam. Currently, the main vessel is preheated and sodium has been charged into two secondary loops that are operated in recirculation mode. In order to characterize the radiation field and contamination, the workplace monitoring is undertaken using installed monitors that are commissioned and made operational. This helps to ensure radiological protection during normal operating conditions. On the other hand, radiological monitoring in emergency conditions is quite different. For undertaking the mitigative accident management, a set of specialized nuclear instruments called post-accident monitoring systems (PAMS) which include radiation monitors are stipulated. The Fukushima Daiichi accident emphasized the importance and need for reliable accident monitoring instrumentation to indicate the safety functions during the progression and aftermath of accident in NPP. In PFBR, the PAMS are integrated with other monitoring systems in design stage itself to manage the measurements and indicating the safety functions for implementing EOP and SAMG

  6. Integrated monitoring technologies for the management of a Soil-Aquifer-Treatment (SAT) system.

    Science.gov (United States)

    Papadopoulos, Alexandros; Kallioras, Andreas; Kofakis, Petros; Bumberger, Jan; Schmidt, Felix; Athanasiou, Georgios; Uzunoglou, Nikolaos; Amditis, Angelos; Dietrich, Peter

    2016-04-01

    Artificial recharge of groundwater has an important role to play in water reuse as treated wastewater effluent can be infiltrated into the ground for aquifer recharge. As the effluent moves through the soil and the aquifer, it undergoes significant quality improvements through physical, chemical, and biological processes in the underground environment. Collectively, these processes and the water quality improvement obtained are called soil-aquifer-treatment (SAT) or geopurification. The pilot site of Lavrion Technological & Cultural Park (LTCP) of the National Technical University of Athens (NTUA), involves the employment of plot infiltration basins at experimental scale, which will be using waters of impaired quality as a recharge source, and hence acting as a Soil-Aquifer-Treatment, SAT, system. Τhe LTCP site will be employed as a pilot SAT system complemented by new technological developments, which will be providing continuous monitoring of the quantitative and qualitative characteristics of infiltrating groundwater through all hydrologic zones (i.e. surface, unsaturated and saturated zone). This will be achieved by the development and installation of an integrated system of prototype sensing technologies, installed on-site, and offering a continuous evaluation of the performance of the SAT system. An integrated approach of the performance evaluation of any operating SAT system should aim at parallel monitoring of all hydrologic zones, proving the sustainability of all involved water quality treatment processes within unsaturated and saturated zone. Hence a prototype system of Time and Frequency Domain Reflectometry (TDR & FDR) sensors is developed and will be installed, in order to achieve continuous quantitative monitoring of the unsaturated zone through the entire soil column down to significant depths below the SAT basin. Additionally, the system contains two different radar-based sensing systems that will be offering (i) identification of preferential

  7. High water level installation of monitoring wells for underground storage tanks

    International Nuclear Information System (INIS)

    Treadway, C.

    1990-01-01

    This paper briefly describes a common monitoring well installation design for shallow ground water contamination resulting from leaky underground storage tanks. The paper describes drilling techniques used in unconsolidated Florida aquifers using hollow-stem augers. It describes methods for the prevention of heaving sands and sand-locking problems. It then goes on to describe the proper well casing placement and sealing techniques using neat cements. The proper sell screen level is also discussed to maximize the detection of floating hydrocarbons

  8. Safeguards equipment of the future: Integrated monitoring systems and remote monitoring

    International Nuclear Information System (INIS)

    Sonnier, C.S.; Johnson, C.S.

    1994-01-01

    From the beginning, equipment to support IAEA Safeguards could be characterized as that which is used to measure nuclear material, Destructive Assay (DA) and Non Destructive Assay (NDA), and that which is used to provide continuity of knowledge between inspection intervals, Containment ampersand Surveillance (C/S). C/S equipment has often been thought of as Cameras and Seals, with a limited number of monitors being employed as they became available. In recent years, technology has advanced at an extremely rapid rate, and continues to do so. The traditional film cameras are being replaced by video equipment, and fiber optic and electronic seals have come into rather widespread use. Perhaps the most interesting aspect of this evolution, and that which indicates the wave of the future without much question, is the integration of video surveillance and electronic seals with a variety of monitors. This is demonstrated by safeguards systems which are installed in several nuclear facilities in France, Germany, Japan, the UK, the USA, and elsewhere. The terminology of Integrated Monitoring Systems (IMS) has emerged, with the employment of network technology capable of interconnecting all desired elements in a very flexible manner. Also, the technology for transmission of a wide variety of information to off-site locations, termed Remote Monitoring, is in widespread industrial use, requiring very little adaptation for safeguards use. This paper examines the future of the Integrated Monitoring Systems and Remote Monitoring in International Safeguards, including technical and other related factors

  9. A metrology system for a high resolution cavity beam position monitor system

    Science.gov (United States)

    Walston, Sean; Boogert, Stewart; Chung, Carl; Fitsos, Pete; Frisch, Joe; Gronberg, Jeff; Hayano, Hitoshi; Hinton, Shantell; Honda, Yosuke; Khainovski, Oleg; Kolomensky, Yury; Loscutoff, Peter; Lyapin, Alexey; Malton, Stephen; May, Justin; McCormick, Douglas; Meller, Robert; Miller, David; Orimoto, Toyoko; Ross, Marc; Slater, Mark; Smith, Steve; Smith, Tonee; Terunuma, Nobuhiro; Thomson, Mark; Urakawa, Junji; Vogel, Vladimir; Ward, David; White, Glen

    2013-11-01

    International Linear Collider (ILC) interaction region beam sizes and component position stability requirements will likely be as small as a few nanometers. It is important to the ILC design effort to demonstrate that these tolerances can be achieved-ideally using a beam-based stability measurement. We developed a high resolution RF cavity Beam Position Monitor (BPM) system. A triplet of these BPMs, installed in the extraction line of the KEK Accelerator Test Facility (ATF) and tested with its ultra-low emittance beam, achieved a position measurement resolution of 15 nm. A metrology system for the three BPMs was subsequently installed. This system employed optical encoders to measure each BPM's position and orientation relative to a zero-coefficient of thermal expansion carbon fiber frame. We have demonstrated that the three BPMs behave as a rigid-body at the level of less than 5 nm.

  10. Automatic Energy Control And Monitoring System For Building

    Directory of Open Access Journals (Sweden)

    Hnin Nu Thaung

    2015-08-01

    Full Text Available The use of smart home technology in the home or building offers significant potential for energy savings. In this paper an energy management system based on wireless sensor networks. The proposed system is composed of two main components a wireless sensor network and monitoring terminal. Wireless sensors are used for sensing and transmitting electricity data and remote monitoring and control of appliances are provided to users through computer. The system enables users to save energy by monitoring and controlling appliances through terminal. This paper gives an overview of sensor technology and wireless networks in the development of an intelligent energy management system for buildings. This technology has ample potential to change the way live and work. ZigBee is used as a communication medium in building intelligent energy management system in this paper. From the prototype setup it is shown that ZigBee is a suitable technology to be adopted as the communication infrastructure in energy management system for buildings .The proposed system can be installed and maintained in residential environments with ease.

  11. Work plan for monitor well/groundwater elevation data recorder installation at the Cheney Disposal site, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1994-09-01

    In May 1990, during the excavation for the Grand Junction, Colorado, Cheney Reservoir disposal cell (Cheney), a water bearing paleochannel was encountered along the northern boundary of the excavation (designated the Northwest Paleochannel). To ensure the long-term integrity of the disposal embankment, remedial actions were taken including the excavation of the paleochannel and underlying material to bedrock, backfilling of the trapezoidal trench with granular material, and placement of a geotextile liner above the granular material. Compacted clay backfill was placed above the reconstructed paleochannel trench, and the northwest corner was restored to the designated grade. Investigation of other paleochannels determined that ground water flow terminated before it migrated as far west as the disposal cell. Therefore, flow in these paleochannels would have no impact on the disposal cell. Although characterization efforts did not indicate the presence of a ground water-bearing paleochannel south of the disposal cell, the potential could not be ruled out. As a best management practice for long-term monitoring at Cheney, two monitor wells will be installed within the paleochannels. One well will be installed within 50 feet (ft) west of the reconstructed Northwest Paleochannel. The second well will be installed near the southwestern (downgradient) corner of the disposal cell. The purposes of these wells are to characterize ground water flow (if any) within the paleochannels and to monitor the potential for water movement (seepage) into or out of the disposal cell. Initial monitoring of the paleochannels will consist of water level elevation measurement collection and trend analysis to evaluate fluctuations in storage. The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of two ground water monitor wells and two ground water elevation data recorders (data loggers) at Cheney

  12. Monitoring and Mitigation Alternatives for Protection of North Atlantic Right Whales during Offshore Wind Farm Installation

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Halvorsen, Michele B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Matzner, Shari [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Stavole, Jessica [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2012-09-01

    Progress report on defining and determining monitoring and mitigation measures for protecting North Atlantic Right Whales from the effects of pile driving and other activities associated with installation of offshore wind farms.

  13. Wire system aging assessment and condition monitoring (WASCO)

    International Nuclear Information System (INIS)

    Fantoni, P.F.

    2007-04-01

    Nuclear facilities rely on electrical wire systems to perform a variety of functions for successful operation. Many of these functions directly support the safe operation of the facility; therefore, the continued reliability of wire systems, even as they age, is critical. Condition Monitoring (CM) of installed wire systems is an important part of any aging program, both during the first 40 years of the qualified life and even more in anticipation of the license renewal for a nuclear power plant. This report contains some test results of a method for wire system condition monitoring, developed at the Halden Reactor Project, called LIRA (LIne Resonance Analysis), which can be used on-line to detect any local or global changes in the cable electrical parameters as a consequence of insulation faults or degradation. (au)

  14. The beam intensity and positron monitoring system of the Daresbury Electron Synchrotron (NINA)

    International Nuclear Information System (INIS)

    Poole, D.E.; Ring, T.; Peters, D.G.; Allen, J.

    1976-01-01

    The beam sensing system of NINA has been redesigned and rebuilt to provide comprehensive monitoring of beam intensity and position. The reasons for the change are stated, and the requirements and performance specification for the new system are listed. The report falls under the following heads: the sensing head; the head electronics unit; the line receiver unit; performance of installed monitors; display system and computer interface. The performance of the new system is summarized. (U.K.)

  15. Development of a quality management system for Brazilian nuclear installations

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Zouain, Desiree Moraes

    2005-01-01

    The present work is a proposal for developing a quality management system for Brazilian nuclear installations, based on applicable standards. The standard ISO 9001:2000 [4] establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard IAEA 50-C/SG-Q [1] establishes general requirements for the implementation of a quality assurance system in nuclear installations. The standard CNEN-NN- 1.16 [5] establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The revision of standard IAEA 50-C/SG-Q [1], to be replaced by IAEA DS 338 [2] and IAEA DPP 349 [3], introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concept of 'Quality Assurance'. This approach is incorporated with the current tendency, because it guides the system to manage, in an integrated way, the requirements of quality, safety, health, environment, security and economics of the installation. The results of the characterization of the quality management systems established in the applicable standards are presented, with the determination of the common and conflicting points among them. Referring data to quality assurance program/quality management system in some nuclear installations of IAEA Member States are also presented. (author)

  16. Data acquisition and control system in a heavy water detritiation installation

    International Nuclear Information System (INIS)

    Stefan, Iuliana; Balteanu, Ovidiu; Retevoi, Carmen; Stefan, Liviu

    2002-01-01

    The experimental installation for extracting tritium and deuterium from the tritiated heavy water used as moderator in CANDU type nuclear reactors is described. The separated tritium of high purity can be used in the fusion reactors of the future or in various laboratory researches. The fluids implied in operating this installation require special safety measures to be taken to protect both the operational personnel and the environment. Accordingly, in the technologic room no personnel is allowed and hence parameter monitoring, analyses and the testing must be done by remote control equipment. The computers for monitoring, warning and testing, as well as the sensors are housed in the data acquisition room, separated from the control room. The values generated by the process variables are converted in electrical or pneumatic signals and subsequently transmitted to the subsystems of monitoring, control and protection. Data acquisition in the control room is ensured by a computer provided with a FieldPoint interface. So, the connection between I/O modules from the data acquisition room and the computer ensures a 115.2 kb/s speed. Measured values of the parameters are recorded and displayed in the control room. Here these are compared with preset limits of the process parameters and in case of abnormal behavior, an alarm is triggered both optically and acoustically. At the same time, the program which controls the inputs and the outputs makes decisions and issues corrective or preventive commands for the technological process or installation protection, respectively. A diagram illustrating the monitoring, using a LabView platform is presented

  17. The year 2000 embedded systems problem to maintain the safety of nuclear installations

    International Nuclear Information System (INIS)

    Ardisasmita, M.S.

    1999-01-01

    The Y2K problem may impact on nuclear installations in a number of ways because embedded systems are used in nuclear routine operation, monitoring and control system. The very simplest embedded systems are capable of performing only a single function or set of functions to meet a single predetermined purpose. In more complex systems the functioning of the embedded system is determined by an application program that enables the embedded system to be used for a particular purpose in a specific application. The simplest devices consist of a single microprocessor which may itself be packaged with other chips in a hybrid system or Application Specific Integrated Circuit (ASIC). Its input comes from a detector or sensor and its output goes to a switch or activator which may start or stop the operation of a positioning motors or, by operating a valve, may control the flow of cooling system to reactor core. Embedded systems in our organization are also be found in Batan security systems. These include systems for the security of buildings and premises, and in the communication systems on which these depend. In the enclosed paper we demonstrate the use of analytic model and reliability analysis. The subject of this reliability test is to detect the components of the embedded system with PLC's that could fail on Y2K problem in nuclear installation and safety system. (author)

  18. Small Scale Rollout of PV Systems in Chikwawa District, Malawi: Remote Monitoring System Effectiveness

    Directory of Open Access Journals (Sweden)

    Million Mafuta

    2017-01-01

    Full Text Available Off-grid solar photovoltaic systems in Malawi are deployed increasingly as the primary option for rural public infrastructure such as primary schools and health centres. Overall, grid-connected electricity access has remained stagnant at around 9% with only 1% of rural population connected. To improve the technical sustainability of such systems, a novel remote monitoring technology utilising Wireless Sensor Networks was installed and the systems were monitored over roughly one year. This paper has described the technical design, performance, and benefits received from deployment of the technology. Furthermore, it has evaluated the cost implications for a larger scale rollout and potential benefits.

  19. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  20. Smartfactory, a modular, low-cost productivity monitoring system to impact SMMEs

    CSIR Research Space (South Africa)

    Bosscha, PA

    2010-09-01

    Full Text Available lack of objectivity and plain incorrect data entries. In aid of SMMEs, the Smartfactory system offers a low-cost modular monitoring solution capable of implementation in a step-by-step fashion with little training required in installation, maintenance...

  1. The Management System for Nuclear Installations. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a) To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b) As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c) To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a) Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b) Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c) Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d) Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e) Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear

  2. The high-voltage monitor system for the calorimeter of the OBELIX experiment

    International Nuclear Information System (INIS)

    Bertin, A.; Bruschi, M.; Capponi, M.; Cereda, B.; D'Antone, I.; De Castro, S.; Galli, D.; Giacobbe, B.; Marconi, U.; Massa, I.; Piccinini, M.; Poli, M.; Semprini-Cesari, N.; Spighi, R.; Vecchi, S.; Vezzani, A.; Villa, M.; Vitale, A.; Zoccoli, A.

    1993-01-01

    We describe the monitor system developed to manage the high voltage power supply for the electromagnetic calorimeter of the OBELIX experiment, installed on the LEAR facility at CERN. The hardware and software characteristics of the system are discussed, as well as the performance of the same. (orig.)

  3. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    Science.gov (United States)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  4. Physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Toepfer, K.

    1989-01-01

    This contribution investigates the possible danger and the legal basis of physical protection and explains the current, integrated system provided for, as well as the underlying possible scenarios of an assault: (1) by a violent crowd of aggressors outside the installation, (2) by a small group of aggressors outside the installation, (3) by a person allowed to enter (internal assault). The physical protection system supplements the internal safety measures to enhance protection against hypothetical and possible acts of terrorism or other criminal assault. The system covers external and internal controlled areas, access monitoring, physical protection control room and service, security checks of the personnel, and activities to disclose sabotage. Some reflections on the problem field between security controls and the constitutional state conclude this contribution. (orig./HSCH) [de

  5. Development of wall conditioning and impurity monitoring systems in Versatile Experiment Spherical Torus (VEST)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, H.Y., E-mail: brbbebbero@snu.ac.kr [Seoul National University, Seoul (Korea, Republic of); Yang, J.; Kim, Y.G.; Yang, S.M.; Kim, Y.S.; Lee, K.H. [Seoul National University, Seoul (Korea, Republic of); An, Y.H. [National Fusion Research Institute, Daejon (Korea, Republic of); Chung, K.J.; Na, Y.S. [Seoul National University, Seoul (Korea, Republic of); Hwang, Y.S., E-mail: yhwang@snu.ac.kr [Seoul National University, Seoul (Korea, Republic of)

    2016-11-01

    Highlights: • The baking for partial wall heating and H{sub 2}/He GDC systems are developed in VEST. • The RGA and OES systems for monitoring impurities are constructed in VEST. • The partial baking and He GDC show limited effects on plasma characteristics. • H{sub 2} GDC above 4 h enables the longer plasma current duration up to ∼15 ms. • After H{sub 2} GDC, the discharge should be conducted within 3 h from treatment. - Abstract: Wall conditioning and impurity monitoring systems are developed in Versatile Experiment Spherical Torus (VEST). As a wall conditioning system, a baking system covering the vacuum vessel wall partially and a glow discharge cleaning (GDC) system using two electrodes with dc and 50 kHz power supplies are installed. The GDC system operates with hydrogen and helium gases for both chemical and physical desorption. The impurity monitoring system with residual gas analyzer (RGA), operating at <10{sup −5} Torr with a differential pumping system, is installed along with the optical emission spectroscopy (OES) system to monitor the hydrogen and impurity radiation lines. Effects of these wall conditioning techniques are investigated with the impurity monitoring system for ohmic discharges of VEST. The partial baking and He GDC show limited effects on plasma characteristics but sufficient H{sub 2} GDC above 4 h enables the longer plasma current duration up to ∼15 ms within 3 h from the end of treatment.

  6. Development of wall conditioning and impurity monitoring systems in Versatile Experiment Spherical Torus (VEST)

    International Nuclear Information System (INIS)

    Lee, H.Y.; Yang, J.; Kim, Y.G.; Yang, S.M.; Kim, Y.S.; Lee, K.H.; An, Y.H.; Chung, K.J.; Na, Y.S.; Hwang, Y.S.

    2016-01-01

    Highlights: • The baking for partial wall heating and H_2/He GDC systems are developed in VEST. • The RGA and OES systems for monitoring impurities are constructed in VEST. • The partial baking and He GDC show limited effects on plasma characteristics. • H_2 GDC above 4 h enables the longer plasma current duration up to ∼15 ms. • After H_2 GDC, the discharge should be conducted within 3 h from treatment. - Abstract: Wall conditioning and impurity monitoring systems are developed in Versatile Experiment Spherical Torus (VEST). As a wall conditioning system, a baking system covering the vacuum vessel wall partially and a glow discharge cleaning (GDC) system using two electrodes with dc and 50 kHz power supplies are installed. The GDC system operates with hydrogen and helium gases for both chemical and physical desorption. The impurity monitoring system with residual gas analyzer (RGA), operating at <10"−"5 Torr with a differential pumping system, is installed along with the optical emission spectroscopy (OES) system to monitor the hydrogen and impurity radiation lines. Effects of these wall conditioning techniques are investigated with the impurity monitoring system for ohmic discharges of VEST. The partial baking and He GDC show limited effects on plasma characteristics but sufficient H_2 GDC above 4 h enables the longer plasma current duration up to ∼15 ms within 3 h from the end of treatment.

  7. A metrology system for a high resolution cavity beam position monitor system

    Energy Technology Data Exchange (ETDEWEB)

    Walston, Sean, E-mail: walston2@llnl.gov [Lawrence Livermore National Laboratory, 7000 East Ave., L-181, Livermore, CA 94550 (United States); Boogert, Stewart [Royal Holloway, University of London, Egham (United Kingdom); Chung, Carl; Fitsos, Pete [Lawrence Livermore National Laboratory, 7000 East Ave., L-181, Livermore, CA 94550 (United States); Frisch, Joe [Stanford Linear Accelerator Center, Menlo Park, CA (United States); Gronberg, Jeff [Lawrence Livermore National Laboratory, 7000 East Ave., L-181, Livermore, CA 94550 (United States); Hayano, Hitoshi [High Energy Accelerator Research Organization (KEK), Tsukuba-shi, Ibaraki-ken (Japan); Hinton, Shantell [Stanford Linear Accelerator Center, Menlo Park, CA (United States); Honda, Yosuke [High Energy Accelerator Research Organization (KEK), Tsukuba-shi, Ibaraki-ken (Japan); Khainovski, Oleg; Kolomensky, Yury; Loscutoff, Peter [University of California and Lawrence Berkeley National Laboratory, Berkeley, CA (United States); Lyapin, Alexey; Malton, Stephen [University College London, London (United Kingdom); May, Justin; McCormick, Douglas [Stanford Linear Accelerator Center, Menlo Park, CA (United States); Meller, Robert [Cornell University, Ithaca, NY (United States); Miller, David [University College London, London (United Kingdom); Orimoto, Toyoko [University of California and Lawrence Berkeley National Laboratory, Berkeley, CA (United States); California Institute of Technology, Pasadena, CA (United States); Ross, Marc [Stanford Linear Accelerator Center, Menlo Park, CA (United States); Fermi National Accelerator Laboratory, Batavia, IL (United States); and others

    2013-11-11

    International Linear Collider (ILC) interaction region beam sizes and component position stability requirements will likely be as small as a few nanometers. It is important to the ILC design effort to demonstrate that these tolerances can be achieved–ideally using a beam-based stability measurement. We developed a high resolution RF cavity Beam Position Monitor (BPM) system. A triplet of these BPMs, installed in the extraction line of the KEK Accelerator Test Facility (ATF) and tested with its ultra-low emittance beam, achieved a position measurement resolution of 15 nm. A metrology system for the three BPMs was subsequently installed. This system employed optical encoders to measure each BPM's position and orientation relative to a zero-coefficient of thermal expansion carbon fiber frame. We have demonstrated that the three BPMs behave as a rigid-body at the level of less than 5 nm.

  8. Design of overload vehicle monitoring and response system based on DSP

    Science.gov (United States)

    Yu, Yan; Liu, Yiheng; Zhao, Xuefeng

    2014-03-01

    The overload vehicles are making much more damage to the road surface than the regular ones. Many roads and bridges are equipped with structural health monitoring system (SHM) to provide early-warning to these damage and evaluate the safety of road and bridge. However, because of the complex nature of SHM system, it's expensive to manufacture, difficult to install and not well-suited for the regular bridges and roads. Based on this application background, this paper designs a compact structural health monitoring system based on DSP, which is highly integrated, low-power, easy to install and inexpensive to manufacture. The designed system is made up of sensor arrays, the charge amplifier module, the DSP processing unit, the alarm system for overload, and the estimate for damage of the road and bridge structure. The signals coming from sensor arrays go through the charge amplifier. DSP processing unit will receive the amplified signals, estimate whether it is an overload signal or not, and convert analog variables into digital ones so that they are compatible with the back-end digital circuit for further processing. The system will also restrict certain vehicles that are overweight, by taking image of the car brand, sending the alarm, and transferring the collected pressure data to remote data center for further monitoring analysis by rain-flow counting method.

  9. Innovative solutions in monitoring systems in flood protection

    Science.gov (United States)

    Sekuła, Klaudia; Połeć, Marzena; Borecka, Aleksandra

    2018-02-01

    The article presents the possibilities of ISMOP - IT System of Levee Monitoring. This system is able to collecting data from the reference and experimental control and measurement network. The experimental levee is build in a 1:1 scale and located in the village of Czernichow, near Cracow. The innovation is the utilization of a series of sensors monitoring the changes in the body of levee. It can be done by comparing the results of numerical simulations with results from installed two groups of sensors: reference sensors and experimental sensors. The reference control and measurement sensors create network based on pore pressure and temperature sensors. Additionally, it contains the fiber-optic technology. The second network include design experimental sensors, constructed for the development of solutions that can be used in existing flood embankments. The results are important to create the comprehensive and inexpensive monitoring system, which could be helpful for state authorities and local governments in flood protection.

  10. A VME based health monitoring system

    International Nuclear Information System (INIS)

    Huang Yiming; Wang Chunhong

    2011-01-01

    It introduces a VME based health system for monitoring the working status of VME crates in the BEPCⅡ. It consists of a PC and a VME crate where a CMM (Classic Monitor System) is installed. The CMM module is responsible for collecting data from the power supply and temperature as well as fan speed inside the VME crate and send these data to the PC via the serial port. The author developed EPICS asynchronous driver by using a character-based device protocol StreamDevice. The data is saved into EPICS IOC database in character. Man-machine interface which is designed by BOY displays the running status of the VME crate including the power supply and temperature as well as fan speed. If the value of records display unusual, the color of the value will be changed into red. This can facilitate the maintenance of the VME crates. (authors)

  11. The installation of helium auxiliary systems in HTGR

    International Nuclear Information System (INIS)

    Qin Zhenya; Fu Xiaodong

    1993-01-01

    The inert gas Helium was chosen as reactor coolant in high temperature gas coolant reactor, therefore a set of Special and uncomplex helium auxiliary systems will be installed, the safe operation of HTR-10 can be safeguarded. It does not effect the inherent safety of HTR-10 MW if any one of all those systems were damaged during operation condition. This article introduces the design function and the system principle of all helium auxiliary systems to be installed in HTR-10. Those systems include: helium purification and its regeneration system, helium supply and storage system, pressure control and release system of primary system, dump system for helium auxiliary system and fuel handling, gaseous waste storage system, water extraction system for helium auxiliary systems and evacuation system for primary system

  12. Seals monitoring systems using wireless communications

    International Nuclear Information System (INIS)

    Hermand, Guillaume; Bertrand, Johan; Farhoud, Radwan; Suzuki, Kei; ETO, Jiro; Tanabe, Hiromi; Takamura, Hisashi; Suyama, Yasuhiro

    2012-01-01

    Document available in extended abstract form only. Wireless monitoring based on electromagnetic waves is a promising application for deep geological nuclear waste repositories. It should allow data transmission without installing wires across the various seals (disposal cell plugs, gallery plugs, shaft plugs). Developments of the wireless system (e.g. transmitter and receiver) are in progress in order to fit the repository requirements. A common research program has been elaborated by RWMC and Andra. The present work aims at developing the wireless monitoring technology to intermediate level waste (ILW) disposal facilities concept. In this concept, ILW packages will be emplaced in disposal cells with concrete liner. After the operational phase, the cells will be backfilled with sealing material. In practice, this work demonstrates the feasibility of adapting and optimizing the wireless transmission system for specific repository cases. After preliminary transmission studies, it was decided to make a representative test in situ of a wireless transmission through the clay from a sealed side to an accessible side of the repository. In order to reduce the attenuation of magnetic flux caused by steel components between the transmitter and the receiver, the receiving antenna is installed in a dedicated borehole (drilled from the accessible side). Two types of reception antennas have been designed. According to its coil orientation, type A antenna measures the electromagnetic wave perpendicular to the borehole axis. On the other hand, type B antenna with a coil set in-line with the tubular casing, measures the electromagnetic wave parallel to the borehole axis. The outside cylinder (pressure tight case) is made of PVC considering the attenuation of electromagnetic flux. According to the direction of electromagnetic flux and position of the boreholes in the final repository design, type A or type B will be chosen. For the 'representative' test, a borehole, TSF1002 has been

  13. Work plan for ground water elevation data recorder/monitor well installation at Gunnison, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-08-01

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the Gunnison, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between ground water and surface water in the area. Data collection objectives (DCO) identify reasons for collecting data. The following are DCOs for the Gunnison ground water elevation data recorder/monitor well installation project: long-term continuous ground water level data and periodic ground water samples will be collected to better understand the relationship between surface and ground water at the site; water level and water quality data will eventually be used in future ground water modeling to more firmly establish numerical model boundary conditions in the vicinity of the Gunnison processing site; and modeling results will be used to demonstrate and document the potential remedial alternative of natural flushing

  14. Improvements on monitor system in the KEK 2.5-GeV linac

    International Nuclear Information System (INIS)

    Shidara, T.; Oogoe, T.; Ogawa, Y.

    1989-01-01

    Improvements to the monitor system of the KEK 2.5-GeV linac have been undertaken. Energy analyzing stations were added to both the positron generator linac and the 2.5-GeV electron linac in order to realize easier checking of beam energy. Wall current monitors and profile monitors were added in the beam transport line between the positron generator linac and the 2.5-GeV electron linac in order to realize easier positron-beam transfer. As a result of the installation of an automatic beam-current-surveillance system and with other existing surveillance systems, more reliable and easier operation of the linac is expected. (author)

  15. Solar system installation at Louisville, Kentucky (final report)

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-07

    A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

  16. A Self-Calibrating Remote Control Chemical Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Jessica Croft

    2007-06-01

    The Susie Mine, part of the Upper Tenmile Mining Area, is located in Rimini, MT about 15 miles southwest of Helena, MT. The Upper Tenmile Creek Mining Area is an EPA Superfund site with 70 abandoned hard rock mines and several residential yards prioritized for clean up. Water from the Susie mine flows into Tenmile Creek from which the city of Helena draws part of its water supply. MSE Technology Applications in Butte, Montana was contracted by the EPA to build a treatment system for the Susie mine effluent and demonstrate a system capable of treating mine waste water in remote locations. The Idaho National Lab was contracted to design, build and demonstrate a low maintenance self-calibrating monitoring system that would monitor multiple sample points, allow remote two-way communications with the control software and allow access to the collected data through a web site. The Automated Chemical Analysis Monitoring (ACAM) system was installed in December 2006. This thesis documents the overall design of the hardware, control software and website, the data collected while MSE-TA’s system was operational, the data collected after MSE-TA’s system was shut down and suggested improvements to the existing system.

  17. Safety basis for the 241-AN-107 mixer pump installation and caustic addition

    International Nuclear Information System (INIS)

    Van Vleet, R.J.

    1994-01-01

    This safety Basis was prepared to determine whether or not the proposed activities of installing a 76 HP jet mixer pump and the addition of approximately 50,000 gallons of 19 M (50:50 wt %) aqueous caustic are within the safety envelope as described by Tank Farms (chapter six of WHC-SD-WM-ISB-001, Rev. 0). The safety basis covers the components, structures and systems for the caustic addition and mixer pump installation. These include: installation of the mixer pump and monitoring equipment; operation of the mixer pump, process monitoring equipment and caustic addition; the pump stand, caustic addition skid, the electrical skid, the video camera system and the two densitometers. Also covered is the removal and decontamination of the mixer pump and process monitoring system. Authority for this safety basis is WHC-IP-0842 (Waste Tank Administration). Section 15.9, Rev. 2 (Unreviewed Safety Questions) of WHC-IP-0842 requires that an evaluation be performed for all physical modifications

  18. CORROSION MONITORING IN HANFORD NUCLEAR WASTE STORAGE TANKS, DESIGN AND DATA FROM 241-AN-102 MULTI-PROBE CORROSION MONITORING SYSTEM

    International Nuclear Information System (INIS)

    ANDA, V.S.; EDGEMON, G.L.; HAGENSEN, A.R.; BOOMER, K.D.; CAROTHERS, K.G.

    2009-01-01

    In 2008, a new Multi-Probe Corrosion Monitoring System (MPCMS) was installed in double-shell tank 241-AN-102 on the U.S. Department of Energy's Hanford Site in Washington State. Developmental design work included laboratory testing in simulated tank 241-AN-102 waste to evaluate metal performance for installation on the MPCMS as secondary metal reference electrodes. The MPCMS design includes coupon arrays as well as a wired probe which facilitates measurement of tank potential as well as corrosion rate using electrical resistance (ER) sensors. This paper presents the MPCMS design, field data obtained following installation of the MPCMS in tank 241-AN-102, and a comparison between laboratory potential data obtained using simulated waste and tank potential data obtained following field installation

  19. Helmet-based physiological signal monitoring system.

    Science.gov (United States)

    Kim, Youn Sung; Baek, Hyun Jae; Kim, Jung Soo; Lee, Haet Bit; Choi, Jong Min; Park, Kwang Suk

    2009-02-01

    A helmet-based system that was able to monitor the drowsiness of a soldier was developed. The helmet system monitored the electrocardiogram, electrooculogram and electroencephalogram (alpha waves) without constraints. Six dry electrodes were mounted at five locations on the helmet: both temporal sides, forehead region and upper and lower jaw strips. The electrodes were connected to an amplifier that transferred signals to a laptop computer via Bluetooth wireless communication. The system was validated by comparing the signal quality with conventional recording methods. Data were acquired from three healthy male volunteers for 12 min twice a day whilst they were sitting in a chair wearing the sensor-installed helmet. Experimental results showed that physiological signals for the helmet user were measured with acceptable quality without any intrusions on physical activities. The helmet system discriminated between the alert and drowsiness states by detecting blinking and heart rate variability (HRV) parameters extracted from ECG. Blinking duration and eye reopening time were increased during the sleepiness state compared to the alert state. Also, positive peak values of the sleepiness state were much higher, and the negative peaks were much lower than that of the alert state. The LF/HF ratio also decreased during drowsiness. This study shows the feasibility for using this helmet system: the subjects' health status and mental states could be monitored without constraints whilst they were working.

  20. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Science.gov (United States)

    2010-07-01

    ... continuous operation according to the site-specific monitoring plan. (e) For each venturi scrubber applied to... across the scrubber and scrubber water flow rate during each push according to the requirements in... all recorded readings. (f) For each hot water scrubber applied to pushing emissions, you must install...

  1. Design of in-pile section monitoring system in fuel test loop

    Energy Technology Data Exchange (ETDEWEB)

    Sim, B. S.; Park, K. N.; Park, S. K.; Chi, D. Y.; Lee, J. M.; Ahn, S. H.; Lee, C. Y.; Kim, Y. J. [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    2005-07-01

    In this paper a brief summary of the monitoring system of In-Pile Section(IPS) is described. To meet the user requirements on the test fuel and irradiation conditions, various instruments are installed on the test fuel pin itself and the appropriate locations in IPS. The requirements and descriptions for instruments, gas supply system, and the data acquisition system to sample and record parameters are described.

  2. The drift velocity monitoring system of the CMS barrel muon chambers

    CERN Document Server

    Altenhoefer, Georg Friedrich; Heidemann, Carsten Andreas; Reithler, Hans; Sonnenschein, Lars; Teyssier, Daniel Francois

    2017-01-01

    The drift velocity is a key parameter of drift chambers. Its value depends on several parameters: electric field, pressure, temperature, gas mixture, and contamination, for example, by ambient air. A dedicated Velocity Drift Chamber (VDC) with 1-L volume has been built at the III. Phys. Institute A, RWTH Aachen, in order to monitor the drift velocity of all CMS barrel muon Drift Tube chambers. A system of six VDCs was installed at CMS and has been running since January 2011. We present the VDC monitoring system, its principle of operation, and measurements performed.

  3. The drift velocity monitoring system of the CMS barrel muon chambers

    Science.gov (United States)

    Altenhöfer, Georg; Hebbeker, Thomas; Heidemann, Carsten; Reithler, Hans; Sonnenschein, Lars; Teyssier, Daniel

    2018-04-01

    The drift velocity is a key parameter of drift chambers. Its value depends on several parameters: electric field, pressure, temperature, gas mixture, and contamination, for example, by ambient air. A dedicated Velocity Drift Chamber (VDC) with 1-L volume has been built at the III. Phys. Institute A, RWTH Aachen, in order to monitor the drift velocity of all CMS barrel muon Drift Tube chambers. A system of six VDCs was installed at CMS and has been running since January 2011. We present the VDC monitoring system, its principle of operation, and measurements performed.

  4. Investigation And Mitigation Techniques Of Power Quality Problems In Nuclear Installations

    International Nuclear Information System (INIS)

    Ayad, N.; Elsherbiny, E.; Eleissawi, H.; Zaher, M.; AbdelSalam, G.

    2013-01-01

    The electrical power systems are exposed to different types of power quality disturbances problems. Investigation and monitoring of power quality is necessary to maintain accurate operation of sensitive equipment especially for nuclear installations. The present research discusses investigation and monitoring of power quality problems for the electrical sources of nuclear installations. Field power quality data is collected by power analyzer and analyzed with reference to power quality standards. There were several disturbances exceeded the thresholds, they were voltage harmonics and voltage flicker. Mitigation techniques were suggested to install a passive filter at low voltage side and all sensitive and critical loads should be isolated and fed through uninterruptible power supply (UPS)

  5. Installation of foundation fieldbus to KUR

    International Nuclear Information System (INIS)

    Ishihara, Shinji; Fujita, Yoshiaki

    1999-11-01

    The instrumentation and control system for the research reactor in Research Reactor Institute, Kyoto University has been used for the safe and steady operation since the initial critical attainment in 1964. It has been modified and added many devices in the chance of increasing the reactor power from 1 MW to 5 MW, installing new experimental facilities or fitting to modified nuclear regulations. In order to avoid the unscheduled shutdown of the research reactor by cause the failure of the devices, most of instrumentation system was renewed in 1999. Operating the research reactor more safely and reliably, Supervisory Control Automation and Data Acquisition System which employed personal computers with the Windows NT operating system was added to the conventional instrumentation system, and the fieldbus system called Foundation Fieldbus was installed. Compared with conventional instrumentation system, each fieldbus system has some advantages. Many kinds of fieldbus systems have been developed and sold on the markets in some countries. Foundation Fieldbus standardizing international, which was able to use the devices made by multi-vendor was tentatively installed to study particular techniques about Foundation Fieldbus. The primary coolant flow rate, the temperature difference between the reactor tank inlet and outlet temperatures, the calorimetric power and the reactor power in nuclear instrumentation are monitored on human-machine interface devices on the fieldbus. The programmable logic controller is employed to control the information system for the reactor. This paper introduces Foundation Fieldbus installed. (author)

  6. Web system for dosimetric data management of internal monitoring programme at IPEN

    International Nuclear Information System (INIS)

    Lima, Vanesa R. de; Rodriguez Junior, Orlando; Todo, Alberto S.

    2008-01-01

    Full text: The internal monitoring programme are carried out for the occupationally exposed workers that develop activities in the radioisotope production plant, fuel cycle facilities, waste management installations, cyclotron and the reactor facility at Institute of Nuclear Energy and Research (IPEN). According to the National Nuclear Energy Commission (CNEN), Regulation NN-3.01, the dose of each worker should be maintained at least for a period of 30 years. With this purpose, an online system, called 'IntDosWeb', was developed with the objective of the management for data dosimetric of internal monitoring programme. The system IntDosWeb, based on free software, was developed in programming language PHP and environment database PostgreSQL. This system is to be available at the local net, Intranet. The database maintains information about identification of the worker that handles non-sealed radioactive sources, physical and chemical characteristics of the radionuclides, monitoring types, measurement data and the dose. This system is able to generate annual reports of the individuals and the historical dose. Several simulation cases have been put into effect to check the on-line software functional capabilities. The users can access the dosimetric information according to following database field: monitoring period, monitoring type, intake pattern, radionuclide type and monitoring data from a specific installation or from each worker. The system was tested in the routinely service of internal dosimetry at IPEN. The rastreability of the information made in the internal monitoring programme was a success and also guaranteeing the reliability and integrity of the stored information. The IntDosWeb was shown as a helpful tool for analysis of the committed effective dose in the radiation protection programme, besides obeying the legal demands of the Brazilian Regulatory Commission. (author)

  7. TFTR grounding scheme and ground-monitor system

    International Nuclear Information System (INIS)

    Viola, M.

    1983-01-01

    The Tokamak Fusion Test Reactor (TFTR) grounding system utilizes a single-point ground. It is located directly under the machine, at the basement floor level, and is tied to the building perimeter ground. Wired to this single-point ground, via individual 500 MCM insulated cables, are: the vacuum vessel; four toroidal field coil cases/inner support structure quadrants; umbrella structure halves; the substructure ring girder; radial beams and columns; and the diagnostic systems. Prior to the first machine operation, a ground-loop removal program was initiated. It required insulation of all hangers and supports (within a 35-foot radius of the center of the machine) of the various piping, conduits, cable trays, and ventilation systems. A special ground-monitor system was designed and installed. It actively monitors each of the individual machine grounds to insure that there are no inadvertent ground loops within the machine structure or its ground and that the machine grounds are intact prior to each pulse. The TFTR grounding system has proven to be a very manageable system and one that is easy to maintain

  8. Groundwater quality monitoring well installation for Waste Area Grouping at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Lee, T.A.

    1994-09-01

    This report documents the drilling and installation of 18 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 11. WAG 11 (White Wing Scrap Yard) is located on the west end of East Fork Ridge between White Wing Road and the Oak Ridge Turnpike. The scrap yard is approximately 25 acres in size. The wells at WAG 11 were drilled and developed between January 1990 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at WAG 11 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. Detailed procedures for well construction were specified by the Engineering Division to ensure that the wells would provide water samples representative of the aquifer. To ensure conformance with the specifications, Energy Systems Construction Engineering and ERCE provided continuous oversight of field activities. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 11. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  9. Groundwater quality monitoring well installation for Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of 22 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 5. WAG 5 is located south of the Oak Ridge National Laboratory main plant area in Melton Valley and includes 33 solid waste management units. The wells at WAG 5 were drilled and developed between July 1987 and March 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 5. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  10. DEMONSTRATiON OF A SUBSURFACE CONTAINMENT SYSTEM FOR INSTALLATION AT DOE WASTE SITES

    Energy Technology Data Exchange (ETDEWEB)

    Thomas J. Crocker; Verna M. Carpenter

    2003-05-21

    Between 1952 and 1970, DOE buried mixed waste in pits and trenches that now have special cleanup needs. The disposal practices used decades ago left these landfills and other trenches, pits, and disposal sites filled with three million cubic meters of buried waste. This waste is becoming harmful to human safety and health. Today's cleanup and waste removal is time-consuming and expensive with some sites scheduled to complete cleanup by 2006 or later. An interim solution to the DOE buried waste problem is to encapsulate and hydraulically isolate the waste with a geomembrane barrier and monitor the performance of the barrier over its 50-yr lifetime. The installed containment barriers would isolate the buried waste and protect groundwater from pollutants until final remediations are completed. The DOE has awarded a contract to RAHCO International, Inc.; of Spokane, Washington; to design, develop, and test a novel subsurface barrier installation system, referred to as a Subsurface Containment System (SCS). The installed containment barrier consists of commercially available geomembrane materials that isolates the underground waste, similar to the way a swimming pools hold water, without disrupting hazardous material that was buried decades ago. The barrier protects soil and groundwater from contamination and effectively meets environmental cleanup standards while reducing risks, schedules, and costs. Constructing the subsurface containment barrier uses a combination of conventional and specialized equipment and a unique continuous construction process. This innovative equipment and construction method can construct a 1000-ft-long X 34-ft-wide X 30-ft-deep barrier at construction rates to 12 Wday (8 hr/day operation). Life cycle costs including RCRA cover and long-term monitoring range from approximately $380 to $590/cu yd of waste contained or $100 to $160/sq ft of placed barrier based upon the subsurface geology surrounding the waste. Project objectives for Phase

  11. Online monitoring and diagnostic system on RA-6 nuclear reactor

    International Nuclear Information System (INIS)

    Garcia Peyrano, O. A.; Marticorena, M.; Koch, R. G.; Martinez, J. S; Berruti, G. E.; Nunez, W. M.; Gonzales, L. A.; Tarquini, L. D.; Sotelo, J. P

    2009-01-01

    This paper presents the Online Automatic Monitoring and Diagnostic System for mechanical components, installed on RA-6 Nuclear Reactor (San Carlos de Bariloche, Argentina). This system has been designed, installed and set-up by the Vibrations and Mechatronics Laboratory (Centro Atomico Bariloche, Comision Nacional de Energia Atomica) and Sitrack.com Argentina SA. This system provides an online mechanical diagnostic of the main reactor components, allowing incipient failures to be early detected and identified, avoiding unscheduled shut-downs and reducing maintenance times. The diagnostic is accomplished by an online analysis of the vibratory signature of the mechanical components, obtained by vibrations sensors on the main pump and the decay tank. The mechanical diagnostic and the main operational parameters are displayed on the reactor control room and published on the internet. [es

  12. Development of a computerized system for performance monitoring and diagnostics in nuclear power plants

    International Nuclear Information System (INIS)

    Chou, G.H.; Chao, H.J.

    1995-01-01

    An on-line computerized system for thermal performance monitoring and diagnostics has been developed at the Institute of Nuclear Energy Research (INER). It was the product of the ChinShan plant performance Monitoring, Analysis and Diagnostics Expert System (CS-MADES) project sponsored by Taiwan Power Company (TPC). The system can carry out turbine performance monitoring and analysis during normal operation, and yield diagnostic results of component degradation after finding out the missing generation problems. Three subsystems were generated to support the whole system framework. They are Test Data Processing Subsystem (TDPS), On-line Monitoring and Analysis Subsystem (OMAS), and Thermal Performance Diagnostics Expert System (TPDES). Some visible benefits have been gained so far through the prototype system installed at the Chinshan nuclear power station

  13. Standard hydrogen monitoring system (SHMS) engineering task plan

    International Nuclear Information System (INIS)

    Tate, D.D.

    1997-01-01

    This document details the responsibilities and requirements for the design, technical documents, fabrication, testing, and installation of the SHMS-E and SHMS-E+ continuous gas monitors. The SHMS-E is identical in function to a SHMS-B but has the interface to accommodate an analytical module containing a gas chromatograph and a B and K photo acoustic gas monitor. Temporary addition of the analytical module adds the ''+'' to the SHMS-E designation. The analytical module is temporary in all installations

  14. ADAM®/SIPLUG®: An innovative valve monitoring system

    International Nuclear Information System (INIS)

    Muñoz, L.; Krell, M.

    2012-01-01

    Optimized maintenance strategies are a key aspect for safe and undisturbed plant operation. Innovative valve service solutions, e.g. valve diagnostics can support this in an efficient way. The ADAM®/SIPLUG® valve monitoring system allows full online monitoring of valves and actuators with automatic evaluation and assessment. Especially for safety-related and operation-related valves this provides valuable information on components condition to ensure proper function and contribute to optimization of maintenance strategies as well as effective maintenance performance. The new SIPLUG®-4 modules are the evolutionary solution for valve diagnosis at the Motor Control Center (MCC). As the SIPLUG®-4 can be installed directly in the MCC outgoing actuator power cable it allows an easy installation in existing switchgear cabinets. Measurement at MCC means also zero effort for performance of diagnostics reducing the number of on-site activities. This results in decrease of maintenance costs and dose rates for deployed personnel. The ADAM® evaluation software and database was developed in parallel with the hardware. It provides automatic analysis of the monitoring results using the limit values specified for the valves. The measured data can be transmitted via the power plant’s local area network to the ADAM® data server, if the SIPLUG® online hardware is installed. With the mobile solution, the data can be transmitted via serial or USB interface to a PC or notebook. With this solution all measurement information will be available immediately in the offices of plant engineers. Also, with SIPLUG® online all operations of valves can be automatically recorded. More than 25 years of experience in various plants worldwide show that the application of ADAM®/SIPLUG® valve diagnostics solution leads to increased plant safety and availability. Some of the references for ADAM®/SIPLUG® are Germany, Switzerland, Brazil, Spain and Eastern Europe. (author)

  15. Gems [Guardian Environmental Monitoring System] keeps a continuous eye on gamma-ray emissions

    International Nuclear Information System (INIS)

    Gould, J.L.

    1986-01-01

    To enable electricity utilities to demonstrate the very low release rates of radiation emitters from nuclear power stations into the environment, Gems (Guardian Environmental Monitoring System) has been developed. The units have been installed as emergency plume monitors round the perimeter of several British power stations and can be connected to windspeed and direction instrumentation to provide on-line activity release data. (UK)

  16. Installation of a Roof Mounted Photovoltaic System

    Science.gov (United States)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  17. ATLAS Tier-2 monitoring system for the German cloud

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, Joerg; Quadt, Arnulf; Weber, Pavel [II. Physikalisches Institut, Georg-August-Universitaet, Goettingen (Germany)

    2011-07-01

    The ATLAS tier centers in Germany provide their computing resources for the ATLAS experiment. The stable and sustainable operation of this so-called DE-cloud heavily relies on effective monitoring of the Tier-1 center GridKa and its associated Tier-2 centers. Central and local grid information services constantly collect and publish the status information from many computing resources and sites. The cloud monitoring system discussed in this presentation evaluates the information related to different cloud resources and provides a coherent and comprehensive view of the cloud. The main monitoring areas covered by the tool are data transfers, cloud software installation, site batch systems, Service Availability Monitoring (SAM). The cloud monitoring system consists of an Apache-based Python application, which retrieves the information and publishes it on the generated HTML web page. This results in an easy-to-use web interface for the limited number of sites in the cloud with fast and efficient access to the required information starting from a high level summary for the whole cloud to detailed diagnostics for the single site services. This approach provides the efficient identification of correlated site problems and simplifies the administration on both cloud and site level.

  18. Real-time health monitoring of civil infrastructure systems in Colombia

    Science.gov (United States)

    Thomson, Peter; Marulanda Casas, Johannio; Marulanda Arbelaez, Johannio; Caicedo, Juan

    2001-08-01

    Colombia's topography, climatic conditions, intense seismic activity and acute social problems place high demands on the nations deteriorating civil infrastructure. Resources that are available for maintenance of the road and railway networks are often misdirected and actual inspection methods are limited to a visual examination. New techniques for inspection and evaluation of safety and serviceability of civil infrastructure, especially bridges, must be developed. Two cases of civil structures with health monitoring systems in Colombia are presented in this paper. Construction of the Pereria-Dos Quebradas Viaduct was completed in 1997 with a total cost of 58 million dollars, including 1.5 million dollars in health monitoring instrumentation provided and installed by foreign companies. This health monitoring system is not yet fully operational due to the lack of training of national personnel in system operation and extremely limited technical documentation. In contrast to the Pereria-Dos Quebradas Viaduct monitoring system, the authors have proposed a relatively low cost health monitoring system via telemetry. This system has been implemented for real-time monitoring of accelerations of El Hormiguero Bridge spanning the Cauca River using the Colombian Southwest Earthquake Observatory telemetry systems. This two span metallic bridge, located along a critical road between the cities of Puerto Tejada and Cali in the Cauca Valley, was constructed approximately 50 years ago. Experiences with this system demonstrate how effective low cost systems can be used to remotely monitor the structural integrity of deteriorating structures that are continuously subject to high loading conditions.

  19. Portable system for periodical verification of area monitors for neutrons

    International Nuclear Information System (INIS)

    Souza, Luciane de R.; Leite, Sandro Passos; Lopes, Ricardo Tadeu; Patrao, Karla C. de Souza; Fonseca, Evaldo S. da; Pereira, Walsan W.

    2009-01-01

    The Neutrons Laboratory develops a project viewing the construction of a portable test system for verification of functioning conditions of neutron area monitors. This device will allow to the users the verification of the calibration maintenance of his instruments at the use installations, avoiding the use of an inadequate equipment related to his answer to the neutron beam response

  20. Managing a major security system installation: Practical lessons learned

    International Nuclear Information System (INIS)

    Roehrig, S.C.

    1986-01-01

    Sandia National Laboratories has been heavily involved for over a decade in aiding a number of DOE facilities in defining and implementing upgraded security safeguards systems. Because security system definition, design, and installation is still a relatively new field to the commercial world, effective project management must pay special attention to first understanding and then interpreting the unique aspects of a security system for all concerned parties. Experiences from an actual security system installation are used to illustrate some project management approaches which have been found to be effective

  1. Development and seismic evaluation of the seismic monitoring analysis system for HANARO

    International Nuclear Information System (INIS)

    Ryu, J. S.; Youn, D. B.; Kim, H. G.; Woo, J. S.

    2003-01-01

    Since the start of operation, the seismic monitoring system has been utilized for monitoring an earthquake at the HANARO site. The existing seismic monitoring system consists of field sensors and monitoring panel. The analog-type monitoring system with magnetic tape recorder is out-of-date model. In addition, the disadvantage of the existing system is that it does not include signal-analyzing equipment. Therefore, we have improved the analog seismic monitoring system except the field sensors into a new digital Seismic Monitoring Analysis System(SMAS) that can monitor and analyze earthquake signals. To achieve this objective for HANARO, the digital type hardware of the SMAS has been developed. The seismic monitoring and analysis programs that can provide rapid and precise information for an earthquake were developed. After the installation of the SMAS, we carried out the Site Acceptance Test (SAT) to confirm the functional capability of the newly developed system. The results of the SAT satisfy the requirements of the fabrication technical specifications. In addition, the seismic characteristics and structural integrity of the SMAS were evaluated. The results show that the cabinet of SMAS can withstand the effects of seismic loads and remain functional. This new SMAS is operating in the HANARO instrument room to acquire and analyze the signal of an earthquake

  2. Software of microcomputer ELEKTRONIKA-60 installed in the control system of the measuring projector PUOS-4

    International Nuclear Information System (INIS)

    Dikij, V.M.; Nekipelova, G.D.; Shakhbazyan, V.V.; Yurpalov, V.D.

    1990-01-01

    The tasks, structure and aspects of realization of servodrivers of the PUOS-4 measuring projector (measuring carriage, tape transport) on the installed ELEKTRONIKA-60 microcomputer operating in the multi-machine system of film information preprocessing, are considered. Realizability of drivers is estimated under rigid operation conditions using the RTM60 real time monitor. The problem of the projector testing is also considered. 11 refs.; 5 figs.; 1 tab

  3. Installation dismantling system, working process and hood utilizable in this system

    International Nuclear Information System (INIS)

    Poirier, J.C.; Mulcey, P.; Morel, P.; Vavasseur, C.

    1989-01-01

    The system for dismantling an installation under a controlled atmosphere is made by a tool polluting the atmosphere, a gas blanket creating a continement zone around the tool, an extractor removing polluted gas from the zone, a purifier for the extracted gas and a controller regulating the flow of gas in the blanket and keeping the installation at constant pressure [fr

  4. Installation package for a solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  5. Description of leakage monitoring system at Angra 2 nuclear power plant primary circuit

    International Nuclear Information System (INIS)

    Costa, Lilian Rose Sobral da; Mendes, Jorge Eduardo de Souza

    1999-01-01

    This paper describes the Leakage Monitoring System installed in Angra 2 NPP. This system has the task of detecting, localizing and quantifying leaks in systems for which rupture preclusion is cited. These systems include the reactor coolant pressure boundary, the main steam and feedwater lines within the containment, and the main steam safety and relief valve station in the valve annex. (author)

  6. Applications of ZigBee Technology in the Safety Monitoring System of Low Gas Pipeline Transportation

    Directory of Open Access Journals (Sweden)

    Wei Deyu

    2015-01-01

    Full Text Available The existing safety monitoring system of low gas pipeline transportation establishes a wired communication network monitoring system mainly on the basis of industrial bus. It has problems such as large transmission signal attenuation, complex wiring, high-labor intensity, inconvenient installation and maintenance, high maintenance cost, and so on. Featuring low cost, power-saving, reliability, stability and flexibility, the wireless sensor network established by ZigBee wireless communication technology can realize the real-time all-dimensional dynamic monitoring on parameters of low gas pipeline transportation system and overcome the shortcomings and deficiencies of wired network system.

  7. Completed installations and the individual commissioning of the KSTAR MG system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang-Hwan, E-mail: kch2004@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Eom, Dae-young; Lee, Woo-Jin; Kong, Jong-Dea; Joung, Nam-Young; Kim, Yang-Soo; Kwon, Myeun [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Jang, Eun; Han, Chul-Woo; Lee, Sel-Ki; Kim, Gwang-Seon; Maeng, Jae-Hoon [Vitzrotech Co., Ltd, 605-2 Seonggok-dong, Danwon-gu, Ansan, Gyeonggi-do 425-833 (Korea, Republic of)

    2014-04-15

    Highlights: • All components of the MG system were made from each professional supplier and installed completely in the NFRI site. • The building and the overhead crane which need to install the MG system, were built in two sections. One is for the bearing, rotor and stator and the other section is for the VVVF and excitation system. • The dummy coil testing will commence in July 2013 and the comprehensive performance test of MG will be tested from August when the MPS commissioning is processing with superconducting coil. - Abstract: Peak power of 200 MVA is required in order to achieve the goal within a long pulse scenario for the final operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The available grid power is only 100 MVA at the National Fusion Research Institute (NFRI) site. Motor generator (MG) was considered as a method of resolving such problems. The design of the KSTAR MG system was completed in July 2010 and individual devices were produced by relevant manufacturers. The installation of individual devices was completed in December 2012. Specifically, the stator and rotor were assembled at the site due to their large size and weight. The bearings, variable voltage variable frequency (VVVF) and excitation systems were transported and installed on site after being manufactured externally. The building used for MG installation was built in 2011. With the building designed for ease of installation, an overhead crane was designed to allow access to the loading bay. In this paper, we discuss the installation of the MG system and the construction of the building suitable for installation of individual devices. In addition, performance on the test results of individual devices is also discussed.

  8. Installation of wireless LAN system into the SuperKEKB accelerator tunnel

    International Nuclear Information System (INIS)

    Iwasaki, Masako; Satoh, Masanori

    2014-01-01

    We have installed a wireless LAN system of the accelerator control network into the accelerator tunnel for SuperKEKB, which is the upgrade plan of the KEKB B-factory project. The wireless LAN system is used for the construction and maintenance of the accelerator components. The leaky coaxial cable (LCX) antennas are installed into the arc sections of SuperKEKB tunnel, and the collinear antennas are installed into the straight sections and the injector Linac. We have selected the LCX and collinear antennas with good radiation hardness of more than 1 MGy. After the installation, we evaluated the wireless LAN system and obtained the good network speed performance in the whole tunnel area. (author)

  9. Usage of aids monitoring in automatic braking systems of modern cars

    OpenAIRE

    Dembitskyi V.; Mazylyuk P.; Sitovskyi O.

    2016-01-01

    Increased safety can be carried out at the expense the installation on vehicles of automatic braking systems, that monitor the traffic situation and the actions of the driver. In this paper considered the advantages and disadvantages of automatic braking systems, were analyzed modern tracking tools that are used in automatic braking systems. Based on the statistical data on accidents, are set the main dangers, that the automatic braking system will be reduced. In order to ensure the acc...

  10. 30 CFR 822.13 - Monitoring.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Monitoring. 822.13 Section 822.13 Mineral... § 822.13 Monitoring. (a) A monitoring system shall be installed, maintained, and operated by the... until all bonds are released in accordance with Subchapter J of this chapter. The monitoring system...

  11. The Architecture of the CMS Level-1 Trigger Control and Monitoring System

    CERN Document Server

    Magrans de Abril, Marc; Hammer, Josef; Hartl, Christian; Xie, Zhen

    2011-01-01

    The architecture of the Level-1 Trigger Control and Monitoring system for the CMS experiment is presented. This system has been installed and commissioned on the trigger online computers and is currently used for data taking at the LHC. This is a medium-size distributed system that runs over 40 PCs and 200 processes that control about 4000 electronic boards. It has been designed to handle the trigger configuration and monitoring during data taking as well as all communications with the main run control of CMS. Furthermore its design has foreseen the provision of the software infrastructure for detailed testing of the trigger system during beam down time.

  12. Installation package - SIMS prototype system 1A

    Science.gov (United States)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  13. Groundwater quality monitoring well installation for Lower Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Lee, T.A.

    1994-09-01

    This report documents the drilling and installation of 11 groundwater quality monitoring (GQM) wells on the perimeter of Lower Waste Area Grouping (WAG) 2. Lower WAG 2 consists of White Oak Lake and the embayment below White Oak Dam above the Clinch River. The wells in Lower WAG 2 were drilled and developed between December 1989 and September 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at Lower WAG 2 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of three basic installation methods was utilized. Detailed procedures for well construction were specified by the Engineering Division to ensure that the wells would provide water samples representative of the aquifer. To ensure conformance with the specifications, Energy Systems Construction Engineering and ERCE provided continuous oversight of field activities. The purpose of the well installation program was to install GQM wells for groundwater characterization at Lower WAG 2. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  14. Automation of the radiation protection monitoring system in the RP-10 reactor

    International Nuclear Information System (INIS)

    Anaya G, Olgger; Castillo Y, Walter; Ovalle S, Edgar

    2002-01-01

    During the reactor operation, it is necessary to carry out the radiological control in the different places of the reactor, in periodic form and to take a registration of these values. For it the radioprotection official, makes every certain periods, settled down in the procedures, to verify and to carry out the registration of those values in manual form of each one of the radiation monitors. For this reason it was carried out the design and implementation of an automatic monitoring system of radioprotection in the reactor. In the development it has been considered the installation of a acquisition data system for 27 radiation gamma monitors of the type Geiger Mueller, installed inside the different places of the reactor and in the laboratories where they are manipulated radioactive material, using as hardware the FieldPoint for the possessing and digitalization of the signs which are correspondents using the communication protocol RS-232 to a PC in which has settled a program in graphic environment that has been developed using the tools of the programming software LabWindows/CVI. Then, these same signs are sent 'on line' to another PC that is in the Emergency Center of Coordination to 500 m of the reactor, by means of a system of radiofrequency communication. (author)

  15. Experience and evaluation of advanced on-line core monitoring system 'BEACON' at IKATA site

    International Nuclear Information System (INIS)

    Fujitsuka, Nobumichi; Tanouchi, Hideyuki; Imamura, Yasuhiro; Mizobuchil, Daisuke

    1997-01-01

    Shikoku Electric Power Company installed BEACON core monitoring system into IKATA unit 3 in May 1994. During its first cycle of core operation, various operational data were obtained including data of some anomalous reactor conditions introduced for the test objective of the plant start-up. This paper presents the evaluation of the BEACON system capability based on this experience. The system functions such as core monitoring and anomaly detection, prediction of future reactor conditions and increased efficiency of core management activities are discussed. Our future plan to utilize the system is also presented. (authors)

  16. Annual Radiological Environmental Monitoring Program Report for the Three Mile Island, Unit 2, Independent Spent Fuel Storage Installation

    International Nuclear Information System (INIS)

    Hall, Gregory Graham

    2002-01-01

    This report presents the results of the 2001 Radiological Environmental Monitoring Program conducted in accordance with 10 CFR 72.44 for the Three Mile Island, Unit 2, Independent Spent Fuel Storage Installation. A description of the facility and the monitoring program is provided. The results of monitoring the two predominant radiation exposure pathways, potential airborne radioactivity releases and direct radiation exposure, indicate the facility operation has not contributed to any increase in the estimated maximum potential dose commitment to the general public.

  17. Radiation protection and monitoring

    International Nuclear Information System (INIS)

    Bruecher, L.; Langmueller, G.; Tuerschmann, G.

    1997-01-01

    The safety, the quality and efficiency of the radiological monitoring systems for block one and two of the NPP Mochovce, designed and delivered by the general designer, should be increased by EUCOM Siemens. Modern, accident resistant and/or more powerful monitoring systems have been designed by Siemens will be added to the existing systems. To achieve this radiation measuring units will be installed inside the hermetic zone, in the reactor hall, at the stack, at the release water system and in the environment in the vicinity of the NPP. The presentation, the storage distribution and the processing of all measuring results also will be optimised by installing a modern high-performance computer system, the so-called Central Radiological Computer System 'CRCS', featuring a high availability. The components will be installed in the relevant control rooms all over the plant. With this computer system it is easy to control the radiation level inside and outside the NPP during normal operation and during and after an accident. Special programs, developed by Siemens support the staff by interpreting the consequences of radioactive releases into the environment and by initiating protection procedures during and after an accident. All functions of the system are available for emergency protection drills and training the staff interruption of the normal control procedure. For the personal protection a digital personal dosimetry system completely considering with the requirements of ICRP 60 and several contamination monitors will be installed. (authors)

  18. Best management practices plan for installation of and monitoring at temporary Weirs at NT-4, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-06-01

    The purpose of the installation of temporary weirs at NT-4 is to collect empirical surface water discharge data for the tributary during baseflow conditions and following rainfall events, during the spring and summer of 1997 in support of the Department of Energy's (DOE's) Oak Ridge Reservation Waste Management Alternatives Evaluation project. The duration of surface-water monitoring activities is not planned to exceed 6 months. A minimum of four temporary weirs will be installed along the length of NT-4 in the locations indicated on Attachment A. The design specifications and locations for the weirs will be provided by the DOE prime contractor for the Oak Ridge Reservation Waste Management Alternatives Evaluation project. The weirs will be fabricated by the Y-12 labor forces of Lockheed Martin Energy Systems (LMES). The Environmental Compliance Organization (ECO) of LMES will perform data collection in addition to weir installation, inspection, maintenance, and removal. Flow meters that collect data at five minute intervals will be installed on each weir and visual measurements using staff gauges mounted on each weir will also be performed

  19. Transparencies used in describing the CTBT verification regime and its four monitoring technologies

    International Nuclear Information System (INIS)

    Basham, P.

    1999-01-01

    This presentation includes description of the CTBT verification regime and its four monitoring technologies, (namely, seismic monitoring, hydro acoustic monitoring, infrasound monitoring and radionuclides monitoring) CTBT global verification system, sequence of steps needed for installing an international monitoring system station which includes: site survey, site preparation and construction, equipment procurement and installation, final tests and certification

  20. Legal provisions governing liquid effluents radiological monitoring

    International Nuclear Information System (INIS)

    Gans, I.; Ruehle, H.

    1985-01-01

    The KTA rule 1504 for radiological monitoring of liquid effluents from nuclear installations is explained. As there are no such rules published to date for establishments handling isotopes, some criteria are discussed which in the future ought to form part of a practical guide for liquid effluents monitoring in isotope handling installations. Monitoring measures described refer to liquid effluents from transfer containers, auxiliary cooling equipment, turbine buildings, main cooling installations, and waste air discharges from closed-circuit cooling systems. (DG) [de

  1. Security television monitoring using a wideband radio-frequency cable system

    International Nuclear Information System (INIS)

    Russell, J.A.; Case, A.L.; Crutcher, R.I.; Wetzell, F.E.

    1981-01-01

    The Oak Ridge National Laboratory (ORNL) was equipped with a multichannel, bidirectional rf cable television system for security assessment. The multichannel cable system was selected over a more conventional video cable system that has separate cables to each camera. Primary considerations for election of the rf cable system were initial cost and ease of midification or additions to the system. Two, 300-MHz cables, having a capacity of approx. 60 channels, and modulators and demodulators for 40 channels were installed. The modulators, located in buildings or building complexes, receive video signals from 40 TV cameras. These signals are transmitted as rf signals by the cable system to centralized emergency control center (ECC) where they are demodulated, processed, and displayed by the video equipment. TV monitors, digital video motion detectors, and recorders enable the dispatcher in the ECC to evaluate and document the video information. This paper covers the justification for a TV system and the reasons for selecting an rf cable system. It includes a discussion of the design criteria, installation, and expansion capabilities of the system

  2. A remote controlled system for continuous radon measurements to realize a monitoring network

    International Nuclear Information System (INIS)

    Roca, V.; Pugliese, M.; Venoso, G.; Roca, V.; Boiano, A.; D'Onofrio, A.; Pugliese, M.; Sabbarese, C.; Venoso, G.; D'Onofrio, A.; Sabbarese, C.

    2006-01-01

    R.A.M.O.N.A. (radon monitoring and acquisition) is a compact system for radon and climatic parameters monitoring. The instrument can perform alpha particles spectrometry with a resolution better than .5 %, so it is possible the discrimination of radon and thoron daughters. The development of battery operated electronics with integrated amplifier and micro controller makes the device applicable for in-lab and in-field measurements. Moreover, an ethernet interface allows to remotely drive the system and the download of acquired data. After a wide use of the prototype in laboratory, a lot of systems has been built and installed in some sites to carry out radon monitoring in soil. (authors)

  3. Vibration monitoring and diagnostic system developments in the VEIKI for the electric power industry

    International Nuclear Information System (INIS)

    Bessenyei, Z.

    1993-01-01

    Members of the ARGUS family comprising IBM PC-based data logging and data evaluation devices for vibration monitoring and diagnostics have been installed at WWER type nuclear reactors (in Paks, Hungary, and in Kalinin, Russia), and at some fossil fuel power plants in Hungary. The important features of the ARGUS monitoring system are discussed, and application details are presented. (N.T.) 2 figs

  4. SSV Launch Monitoring Strategies: HGDS Design Implementation Through System Maturity

    Science.gov (United States)

    Shoemaker, Marc D.; Crimi, Thomas

    2010-01-01

    With over 500,000 gallons of liquid hydrogen and liquid oxygen, it is of vital importance to monitor the space shuttle vehicle (SSV) from external tank (ET) load through launch. The Hazardous Gas Detection System (HGDS) was installed as the primary system responsible for monitoring fuel leaks within the orbiter and ET. The HGDS was designed to obtain the lowest possible detection limits with the best resolution while monitoring the SSV for any hydrogen, helium, oxygen, or argon as the main requirement. The HGDS is a redundant mass spectrometer used for real-time monitoring during Power Reactant Storage and Distribution (PRSD) load and ET load through launch or scrub. This system also performs SSV processing leak checks of the Tail Service Mast (TSM) umbilical quick disconnects (QD's), Ground Umbilical Carrier Plate (GUCP) QD's and supports auxiliary power unit (APU) system tests. From design to initial implementation and operations, the HGDS has evolved into a mature and reliable launch support system. This paper will discuss the operational challenges and lessons learned from facing design deficiencies, validation and maintenance efforts, life cycle issues, and evolving requirements

  5. The Blend Down Monitoring System Demonstration at the Padijcah Gaseous Diffusion Plant

    International Nuclear Information System (INIS)

    Benton, J.; Close, D.; Johnson, W. Jr.; Kerr, P.; March-Leuba, J.; Mastal, E.; Moss, C.; Powell, D.; Sumner, J.; Uckan, T.; Vines, R.; Wright, P.D.

    1999-01-01

    Agreements between the governments of the US and the Russian Federation for the US purchase of low enriched uranium (LEU) derived from highly enriched uranium (HEU) from dismantled Russian nuclear weapons calls for the establishment of transparency measures to provide confidence that nuclear nonproliferation goals are being met. To meet these transparency goals, the agreements call for the installation of nonintrusive US instruments to monitor the down blending of HEU to LEU. The Blend Down Monitoring System (BDMS) has been jointly developed by the Los Alamos National Laboratory (LANL) and the Oak Ridge National Laboratory (ORNL) to continuously monitor 235 U enrichments and mass flow rates at Russian blending facilities. Prior to its installation in Russian facilities, the BDMS was installed and operated in a UF 6 flow loop in the Paducah Gaseous Diffusion Plant simulating flow and enrichment conditions expected in a typical down-blending facility. A Russian delegation to the US witnessed the equipment demonstration in June, 1998. To conduct the demonstration in the Paducah Gaseous Diffusion Plant (PGDP), the BDMS was required to meet stringent Nuclear Regulatory Commission licensing, safety and operational requirements. The Paducah demonstration was an important milestone in achieving the operational certification for the BDMS use in Russian facilities

  6. Commissioning and operational scenarios of the LHC beam loss monitor system

    International Nuclear Information System (INIS)

    Holzer, E.B.

    2007-01-01

    One of the most critical elements for the protection of CERN's Large Hadron Collider (LHC) is its beam loss monitoring (BLM) system. It must prevent quenches in the super conducting magnets and damage of machine components due to beam losses. The contribution will discuss the commissioning procedures of the BLM system and envisaged operational scenarios. About 4000 monitors will be installed around the ring. When the loss rate exceeds a predefined threshold value, a beam abort is requested. Magnet quench and damage levels vary as a function of beam energy and loss duration. Consequently, the beam abort threshold values vary accordingly. By measuring the loss pattern, the BLM system helps to identify the loss mechanism. Furthermore, it will be an important tool for commissioning, machine setup and studies. Special monitors will be used for the setup and control of the collimators. (author)

  7. A microprocessor based monitoring system for a small nuclear reactor facility

    International Nuclear Information System (INIS)

    Miller, G.E.; DeKeyser, C.F.

    1980-01-01

    An inexpensive microprocessor based system has been designed and constructed for our 250 kilowatt TRIGA reactor facility. The system, which is beginning operational testing, can monitor on a continuous basis the status of up to 54 devices and maintain a record of events. These devices include fixed radiation monitors, pool water level trips, security alarms and an access control unit. In the latter case, the unit permits selection of different levels of access permission based on the time of day. The system can alert security and other personnel in the event of abnormalities. Because of the inclusion of this in the security system, special reliability and failure mode operation. The unit must also be simple to install, program and operate. (author)

  8. Metering revisited - innovative concepts for electrical monitoring and reporting systems

    International Nuclear Information System (INIS)

    Stebbins, W.L.

    1993-01-01

    For the first three-quarters of this century, the monitoring of electrical power and energy has been dominated by conventional electromechanical voltmeters, ammeters, and watthour meters. Only in the last decade have solid state microprocessor-based distal devices become available for application in the commercial and industrial marketplace. These new devices perform the tasks of up to 24 conventional indicating meters for about the price of three. Communication via a RS-485 data link to a PC allows monitoring of up to 70 values including times and dates, min/max history, temperature indications, and energy management alarms. Complex waveform analysis can also be carried out for harmonic problems typically associated with adjustable speed drives that have been installed on fans and pumps for energy management savings. Since metering systems are absolutely essential to a successful Energy Management Process, consideration should be given to applying the latest in metering technology. It should be noted that meters by themselves do not save money, they only cost money to install and maintain. Proper monitoring, recording, and analysis lead to corrective actions which produce the desired result of reducing energy per unit of production or per service performed. Experience has shown that a 1 to 2% reduction can be achieved after meters are installed just by letting the users know that they are being monitored. Up to a 5% reduction can occur when the users then become proactive toward better managing of their energy. Ultimately up to 10% reduction can be achieved when metering is tied directly to the process through a PLC or DCS, in a closed loop automated process control arrangement

  9. The Argentine remote monitoring and surveillance system

    International Nuclear Information System (INIS)

    Bonino, A.; Roca, J.L.; Perez, A.; Pizarro, L.; Krimer, M.; Teira, R.; Higa, Z.; Saettone, S.; Monzon, J.; Moroni, D.

    1996-01-01

    The Scientific and Technical Support Department of the Argentine National Board of Nuclear Regulation (ENREN) has developed a Remote Monitoring and Surveillance System (RMSS) that provides a media to verify state of variables related to the monitoring and surveillance activities of nuclear facilities, mainly safeguard applications. RMSS includes a variety of on site installed sensors, an authenticated radiofrequency communication link, a receiver processing unit, an active vision set and a user friendly personal computer interface to collect, view and store pertinent histories of events. A real time data base allows consulting, maintenance, updating and checking activities. RMSS could be integrated into a LAN or WAN via modem for use in a remote operation scheme. In this paper a description of the RMSS is provided. Also, an overview of the RMSS operation at one facility under safeguards belonging to the National Commission of Atomic Energy (CNEA) is presented. Results and conclusions of the system associated with this facility are given. (author). 37 figs

  10. The Argentine remote monitoring and surveillance system

    Energy Technology Data Exchange (ETDEWEB)

    Bonino, A; Roca, J L; Perez, A; Pizarro, L; Krimer, M; Teira, R; Higa, Z; Saettone, S; Monzon, J; Moroni, D [Ente Nacional Regulador Nuclear, Buenos Aires (Argentina). Dept. Apoyo Cientifico y Tecnico

    1997-12-31

    The Scientific and Technical Support Department of the Argentine National Board of Nuclear Regulation (ENREN) has developed a Remote Monitoring and Surveillance System (RMSS) that provides a media to verify state of variables related to the monitoring and surveillance activities of nuclear facilities, mainly safeguard applications. RMSS includes a variety of on site installed sensors, an authenticated radiofrequency communication link, a receiver processing unit, an active vision set and a user friendly personal computer interface to collect, view and store pertinent histories of events. A real time data base allows consulting, maintenance, updating and checking activities. RMSS could be integrated into a LAN or WAN via modem for use in a remote operation scheme. In this paper a description of the RMSS is provided. Also, an overview of the RMSS operation at one facility under safeguards belonging to the National Commission of Atomic Energy (CNEA) is presented. Results and conclusions of the system associated with this facility are given. (author). 37 figs.

  11. Work plan for ground water elevation data recorder/monitor well installation at Grand Junction, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-08-01

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between the shallow aquifer and the Colorado River

  12. Cooling performance of a vertical ground-coupled heat pump system installed in a school building

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Yujin; Lee, Jae-Keun; Jeong, Young-Man; Koo, Kyung-Min [Department of Mechanical Engineering, Pusan National University, San 30, Jangjeon-Dong, Kumjung-Ku, Busan 609-735 (Korea); Lee, Dong-Hyuk; Kim, In-Kyu; Jin, Sim-Won [LG Electronics, 391-2 Gaeumjeong-dong, Changwon City, Gyeongnam (Korea); Kim, Soo H. [Department of Nanosystems and Nanoprocess Engineering, Pusan National University, San 30, Jangjeon-Dong, Kumjung-Ku, Busan 609-735 (Korea)

    2009-03-15

    This paper presents the cooling performance of a water-to-refrigerant type ground heat source heat pump system (GSHP) installed in a school building in Korea. The evaluation of the cooling performance has been conducted under the actual operation of GSHP system in the summer of year 2007. Ten heat pump units with the capacity of 10 HP each were installed in the building. Also, a closed vertical typed-ground heat exchanger with 24 boreholes of 175 m in depth was constructed for the GSHP system. To analyze the cooling performance of the GSHP system, we monitored various operating conditions, including the outdoor temperature, the ground temperature, and the water temperature of inlet and outlet of the ground heat exchanger. Simultaneously, the cooling capacity and the input power were evaluated to determine the cooling performance of the GSHP system. The average cooling coefficient of performance (COP) and overall COP of the GSHP system were found to be {proportional_to}8.3 and {proportional_to}5.9 at 65% partial load condition, respectively. While the air source heat pump (ASHP) system, which has the same capacity with the GSHP system, was found to have the average COP of {proportional_to}3.9 and overall COP of {proportional_to}3.4, implying that the GSHP system is more efficient than the ASHP system due to its lower temperature of condenser. (author)

  13. Singapore's Zero-Energy Building's daylight monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Grobe, Lars; Wittkopf, Stephen; Pandey, Anupama Rana; Xiaoming, Yang; Seng, Ang Kian; Scartezzini, Jean-Louis; Selkowitz, Stephen

    2010-02-28

    A setup to monitor the daylighting performance of different glazing types in Singapore is presented. The glazing is installed in the facade of four dedicated testing chambers in BCAA's Zero Energy Building in Singapore. These test rooms are equipped with sensors that both record illuminances on the work plane, and luminances as seen by occupants. The physical and logical design of the monitoring system is presented. Criteria to assess the daylighting performance are introduced, and initial results of the work in progress are presented.

  14. Automated Intelligent Monitoring and the Controlling Software System for Solar Panels

    Science.gov (United States)

    Nalamwar, H. S.; Ivanov, M. A.; Baidali, S. A.

    2017-01-01

    The inspection of the solar panels on a periodic basis is important to improve longevity and ensure performance of the solar system. To get the most solar potential of the photovoltaic (PV) system is possible through an intelligent monitoring & controlling system. The monitoring & controlling system has rapidly increased its popularity because of its user-friendly graphical interface for data acquisition, monitoring, controlling and measurements. In order to monitor the performance of the system especially for renewable energy source application such as solar photovoltaic (PV), data-acquisition systems had been used to collect all the data regarding the installed system. In this paper the development of a smart automated monitoring & controlling system for the solar panel is described, the core idea is based on IoT (the Internet of Things). The measurements of data are made using sensors, block management data acquisition modules, and a software system. Then, all the real-time data collection of the electrical output parameters of the PV plant such as voltage, current and generated electricity is displayed and stored in the block management. The proposed system is smart enough to make suggestions if the panel is not working properly, to display errors, to remind about maintenance of the system through email or SMS, and to rotate panels according to a sun position using the Ephemeral table that stored in the system. The advantages of the system are the performance of the solar panel system which can be monitored and analyzed.

  15. Progress report of the critical equipment monitoring system

    International Nuclear Information System (INIS)

    Pantis, M.J.

    1984-01-01

    The Philadelphia Electric Company has contracted with Energy Data Systems to develop a Critical Equipment Monitoring System for its Peach Bottom Nuclear Plant. This computerized system is designed to acquire and maintain accurate and timely status information on plant equipment. It will provide auditable record of plant and equipment transactions. Positive equipment identification and location will be provided. Errors in complex logical checking will be minimized. This system should reduce operator loading and improve operator communicatin with the plant personnel. Phase I of this system was installed at Peach Bottom Nuclear Station May 1982. It provides the necessary hardware and software to do check-off lists on critical plant systems. This paper describes some of the start-up and operational problems encountered

  16. The regulatory system of monitoring workers in Germany for intakes of radioactivity

    International Nuclear Information System (INIS)

    Dalheimer, A.; Henrichs, K.

    1996-01-01

    In Germany, the working group 'Incorporation Monitoring' of the German-Swiss Radiation Protection Association defined a new standard for the monitoring of workers occupationally exposed to radioactive material. During the last two years this draft has been accepted by the German government in the form of three guidelines. The purpose of the approach was the installation of a consistent state-of-the-art system: defining clear criteria for the necessity of routine and special monitoring programs, giving guidelines for monitoring programs ensuring that dose assessments are as reliable as necessary with the lowest possible expenses, standardizing as far as possible the procedures of dose assessments, and guaranteeing the necessary quality standards. The scientific basis of this regulatory system are the publications 30 and 54 of lCRP. (author)

  17. Flow Simulation of Modified Duct System Wind Turbines Installed on Vehicle

    Science.gov (United States)

    Rosly, N.; Mohd, S.; Zulkafli, M. F.; Ghafir, M. F. Abdul; Shamsudin, S. S.; Muhammad, W. N. A. Wan

    2017-10-01

    This study investigates the characteristics of airflow with a flow guide installed and output power generated by wind turbine system being installed on a pickup truck. The wind turbine models were modelled by using SolidWorks 2015 software. In order to investigate the characteristic of air flow inside the wind turbine system, a computer simulation (by using ANSYS Fluent software) is used. There were few models being designed and simulated, one without the rotor installed and another two with rotor installed in the wind turbine system. Three velocities being used for the simulation which are 16.7 m/s (60 km/h), 25 m/s (90 km/h) and 33.33 m/s (120 km/h). The study proved that the flow guide did give an impact to the output power produced by the wind turbine system. The predicted result from this study is the velocity of the air inside the ducting system of the present model is better that reference model. Besides, the flow guide implemented in the ducting system gives a big impact on the characteristics of the air flow.

  18. Construction of a Vibration Monitoring System for HANARO's Rotating Machinery and Analysis of Pump Vibration Signals

    International Nuclear Information System (INIS)

    Ryu, Jeong Soo; Yoon, Doo Byung

    2005-01-01

    HANARO is an open-tank-in-pool type research reactor with a thermal power of 30MW. In order to remove the heat generated by the reactor core and the reflector vessel, primary cooling pumps and reflector cooling pumps circulate coolant. These pumps are installed at the RCI(Reactor Concrete Island) which is covered by heavy concrete hatches. For the prevention of an abnormal operation of these pumps in the RCI, it is necessary to construct a vibration monitoring system that provides an alarm signal to the reactor control room when the rotating speed or the vibration level exceeds the allowable limit. The first objective of this work is to construct a vibration monitoring system for HANARO's rotating machinery. The second objective is to verify the possibility of condition monitoring of the rotating machinery. To construct a vibration monitoring system, as a first step, the standards and references related to the vibration monitoring system were investigated. In addition, to determine the number and the location of sensors that can effectively characterize the overall vibration of a pump, the vibration of the primary cooling pumps and the reflector cooling pumps were measured. Based on these results, detailed construction plans for the vibration monitoring system for HANARO were established. Then, in accordance with the construction plans, the vibration monitoring system for HANARO's rotating machinery was manufactured and installed at HANARO. To achieve the second objective, FFT analysis and bearing fault detection of the measured vibration signals were performed. The analysis results demonstrate that the accelerometers mounted at the bearing locations of the pumps can effectively monitor the pump condition

  19. Microprocessor based beam loss monitor system for the AGS

    International Nuclear Information System (INIS)

    Witkover, R.L.

    1979-01-01

    An array of 120 long radiation monitors (LRM) have been installed around the AGS. Each monitor is an extended coaxial ion chamber, 5 meters long, made from hollow core coaxial transmission cable pressured with argon. The LRM's are each connected to a low current preamplifier and voltage-to-frequency converter (VFC). The digital output of each channel is fed to a 16 bit counter chip which bridges the bus of an 8085 microprocessor. This circuit is connected to the AGS PD-10 for data taking or may function as a stand-alone unit. Various operating modes can be selected for data readout. System design and operating performance are described

  20. Geomechanical monitoring system at the Waste Isolation Pilot Plant, Carlsbad, New Mexico

    International Nuclear Information System (INIS)

    Francke, J.L.; Carrasco, R.C.

    1992-01-01

    This paper describes in detail the geomechanical instrumentation system and the database that has been established from the geomechanical monitoring program. In addition, it describes the quality assurance and control measures that are in place to ensure that the data from the underground is accurate, traceable, and defensible. The system is installed at the Waste Isolation Pilot Plant in Carlsbad, New Mexico. This facility is being developed for the disposal of transuranic nuclear wastes in underground excavations in salt 655 meters below the surface. The purpose of the instrumentation system, is to monitor the deformations and stress changes that are occurring in the rock with time. This information is needed to routinely assess conditions in the facility and to ensure that safe operating conditions are maintained. The geomechanical monitoring system has provided data collection, quality control, and database maintenance, all of which are of vital importance to monitoring the geomechanical performance of underground excavations

  1. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Science.gov (United States)

    2010-07-01

    ... Operations § 250.1628 Design, installation, and operation of production systems. (a) General. All production... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Design, installation, and operation of production systems. 250.1628 Section 250.1628 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF...

  2. A longitudinal bunch monitoring system using LabVIEW reg-sign and high-speed oscilloscopes

    International Nuclear Information System (INIS)

    Barsotti, E.L.

    1994-10-01

    A new longitudinal bunch monitoring system has been installed at Fermilab for the Tevatron and Main Ring. For each machine, a signal from a broadband wall current monitor is sampled and digitized by a high-speed oscilloscope. A Macintosh computer, running LabVIEW-based software, controls the scopes and CAMAC timing modules and analyzes the acquired data. The resulting bunch parameters are used for a variety of purposes, including Tevatron collider luminosity calculation and injection analysis. This paper examines the system in detail

  3. The International Monitoring System's Noble Gas Network

    International Nuclear Information System (INIS)

    Auer, M.

    2015-01-01

    The International Monitoring System (IMS) is a unique global network for surveillance of the Comprehensive Nuclear-Test-Ban Treaty. A major component of the IMS is the radionuclide monitoring network since, among all IMS technologies, it can provide the most unequivocal evidence for a nuclear explosion. The radionuclide monitoring component is unprecedented in its combination of global coverage, sensitivity, network density and temporal resolution. In particular for the detection of underground or underwater nuclear tests, forty of the eighty radionuclide stations will eventually be equipped with sensors to measure the Xenon isotopes Xe-131m (τ 1/2 = 11:8 d), Xe-133 (τ 1/2 = 5:25 d), Xe-133m (τ 1/2 = 2:2 d) and Xe-135 (τ 1/2 = 9:14 h). These are among the isotopes with the highest yields in fission of uranium or plutonium with half-lives long enough to be detected at large distances from the point of emission. As of today, 31 noble gas systems have been installed and are sending data to the International Data Centre. The noble gas systems installed at the stations are automated and sample Xenon continuously from atmospheric air for 12 or 24 hours at an air flow of 0.5 to several m 3 /h by absorption of Xenon on activated charcoal. Detection of the Xenon isotopes is either by high resolution gamma spectrometry or by beta-gamma coincidence spectrometry. With the currently available equipment, detection limits of 0.2 mBq/m 3 can be achieved. An overview on the existing technology and future developments as well as on the interpretation of measurement results is given. (author)

  4. Monitoring Systems for Hydropower Plants

    Directory of Open Access Journals (Sweden)

    Damaschin Pepa

    2015-07-01

    Full Text Available One of the most important issue in hydro power industry is to determine the necessary degree of automation in order to improve the operation security. Depending upon the complexity of the system (the power plant equipment the automation specialist will build a philosophy of control following some general principals of security and operation. Helped by the modern digital equipment, today is relative easy to design a complete monitoring and supervising system including all the subparts of a hydro aggregate. A series of sensors and transducers specific for each auxiliary installation of the turbine and generator will be provided, together with a PLC or an industrial PC that will run an application software for implementing the security and control algorithms. The purpose of this paper is to offer a general view of these issues, providing a view of designing an automation & control and security system for hydro power plants of small, medium and big power.

  5. Plant monitor system

    International Nuclear Information System (INIS)

    Scarola, K.; Jamison, D.; Manazir, R.; Rescori, R.; Harmon, D.

    1991-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system which is nuclear qualified for rapid response to changes in plant parameters and a component control system which together provide a discrete monitoring and control capability at a panel in the control room. A separate data processing system, which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs and a large, overhead integrated process status overview board. The discrete indicator and alarm system and the data processing system receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the main machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof. (author)

  6. Development of a real time chemistry monitoring and diagnostic system

    International Nuclear Information System (INIS)

    Gaudreau, T.M.; Millett, P.J.; Bates, J.; Burns, G.

    1998-01-01

    EPRI has developed SMART chem WORKS, which is capable of operating as a real time chemistry diagnostic and monitoring system. A high degree of plant-specific customization is possible which allows discrimination between normal chemistry and off-normal conditions. The initial implementation of the system has been very successful. State of the art technology has been employed which allows remote administration of the system, a flexible, web page display of the output from the system and instant notification of excursions using email and pagers. The second installation of SMART chem WORKS is currently underway at a BWR plant, Grand Gulf. The SMART chem WORKS techniques can be applied to monitor PWR Primary Chemistry, PWR Secondary Chemistry and BWR steam cycle chemistry. A fossil steam cycle simulator will also be developed for application to fossil plants. (J.P.N.)

  7. Technical Analysis of Installed Micro-Combined Heat and Power Fuel-Cell System

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, Kriston P.; Makhmalbaf, Atefe

    2014-10-31

    Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and hot water with greater efficiency and lower emissions than alternative sources. These systems can be used either as baseload, grid-connected, or as off-the-grid power sources. This report presents a technical analysis of 5 kWe CHP-FCSs installed in different locations in the U.S. At some sites as many as five 5 kWe system is used to provide up to 25kWe of power. Systems in this power range are considered “micro”-CHP-FCS. To better assess performance of micro-CHP-FCS and understand their benefits, the U.S. Department of Energy worked with ClearEdge Power to install fifteen 5-kWe PBI high temperature PEM fuel cells (CE5 models) in the commercial markets of California and Oregon. Pacific Northwest National Laboratory evaluated these systems in terms of their economics, operations, and technical performance. These units were monitored from September 2011 until June 2013. During this time, about 190,000 hours of data were collected and more than 17 billion data points were analyzed. Beginning in July 2013, ten of these systems were gradually replaced with ungraded systems (M5 models) containing phosphoric acid fuel cell technology. The new units were monitored until June 2014 until they went offline because ClearEdge was bought by Doosan at the time and the new manufacturer did not continue to support data collection and maintenance of these units. During these two phases, data was collected at once per second and data analysis techniques were applied to understand behavior of these systems. The results of this analysis indicate that systems installed in the second phase of this demonstration performed much better in terms of availability, consistency in generation, and reliability. The average net electrical power output increased from 4.1 to 4.9 kWe, net heat recovery from 4.7 to 5.4 kWth, and system availability improved from 94% to 95%. The average net system electric

  8. Groundwater quality monitoring well installation for Waste Area Groupings 8 and 9 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of nine groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 8 and two GQM wells on the perimeter of WAG 9. WAG 8 encompasses approximately 34 acres, most of which are located in Melton Valley. Irregular in shape, the site has two sinuous extensions from its northern end that contain the low-level radioactive waste (LLW) transfer lines. WAG 8 contains 22 solid waste management units (SWMUs) that can be divided into 4 groups. These groups include the High Flux Isotope Reactor/Transuranium Processing Facility waste collection basins, the LLW line leak sites, and the active LLW tanks. WAG 9 encompasses about 3 acres and is located west of the main portion of WAG 8 and south of Melton Valley Drive. WAG 9 contains four SWMUs. The wells in WAGs 8 and 9 were drilled and developed from June 1989 to March 1990. Monitoring wells were installed to characterize and assess the WAGs in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAGs 8 and 9. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  9. Standard-B Hydrogen Monitoring System, system design description

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1995-01-01

    During most of the year, it is assumed that the vapor in the 177 radioactive waste tanks on the Hanford Project site contain a uniform mixture of gases. Several of these waste tanks (currently twenty five, 6 Double Shell Tanks and 19 Single Shell Tanks) were identified as having the potential for the buildup of gases to a flammable level. An active ventilation system in the Double Shell Tanks and a passive ventilation system in the Single Shell Tanks provides a method of expelling gases from the tanks. A gas release from a tank causes a temporary rise in the tank pressure, and a potential for increased concentration of hydrogen gas in the vapor space. The gas is released via the ventilation systems until a uniform gas mixture in the vapor space is once again achieved. This document describes the design of the Standard-B Hydrogen Monitoring System, (SHMS) and its components as it differs from the original SHMS. The differences are derived from changes made to improve the system performance but not implemented in all the installed enclosures

  10. Standard-B auto grab sampler hydrogen monitoring system, Acceptance Test Report

    International Nuclear Information System (INIS)

    Lott, D.T.

    1995-01-01

    Project W-369, Watch List Tank Hydrogen Monitors, installed a Standard-C Hydrogen Monitoring System (SHMS) on the Flammable gas waste tank AN-104. General Support Projects (8K510) was support by Test Engineering (7CH30) in the performance of the Acceptance Test Procedures (ATP) to qualify the SHMS cabinets on the waste tank. The ATP's performance was controlled by Tank Farm work package. This completed ATP is transmitted by EDT-601748 as an Acceptance Test Report (ATR) in accordance with WHC-6-1, EP 4.2 and EP 1.12

  11. A Mobile Remote Lab System to Monitor in Situ Thermal Solar Installations

    Directory of Open Access Journals (Sweden)

    Gastón Saez de Arregui

    2013-01-01

    Full Text Available In this paper we describe the design and development of interconnected devices which allow monitoring in situ the performance of solar boilers. This mobile remote lab system comprises two huge blocks of hardware: a mobile station located by the boiler, which is monitored and controlled in a remote way, and a fixed station, located in the Laboratory of Energy for the Sustained Development of the Universidad Nacional de Rosario. The communication between the fixed and mobile devices is controlled by microcontrollers included in both stations and programmed in C language. The project is being developed through three parallel lines of work: 1 Design and development of fixed and mobile hardware; 2 Development of firmware and software necessary to register and communicate data; 3 Design and development of learning activities. This mobile remote lab will be useful to test the behavior of solar boilers in the place and environmental conditions where they are placed so as to evaluate their performance and efficiency anywhere. This is also in order to contribute for the implementation of norms for the certification of solar boilers. On the other hand, the data and results obtained from the development will be used as supplies for the design of learning activities

  12. Experimental validation of a mine-wide continuous closure monitoring system as a decision making tool for gold mines.

    CSIR Research Space (South Africa)

    Malan, DF

    2003-03-01

    Full Text Available of a mine-wide continuous closure monitoring system. A RMT remote reading telltale system was modified to operate as a closure system and installed at Mponeng Mine. Unfortunately, this system did not succeed in collecting data from a large number...

  13. Instrumentation Recommendations for Volcano Monitoring at U.S. Volcanoes Under the National Volcano Early Warning System

    Science.gov (United States)

    Moran, Seth C.; Freymueller, Jeff T.; LaHusen, Richard G.; McGee, Kenneth A.; Poland, Michael P.; Power, John A.; Schmidt, David A.; Schneider, David J.; Stephens, George; Werner, Cynthia A.; White, Randall A.

    2008-01-01

    As magma moves toward the surface, it interacts with anything in its path: hydrothermal systems, cooling magma bodies from previous eruptions, and (or) the surrounding 'country rock'. Magma also undergoes significant changes in its physical properties as pressure and temperature conditions change along its path. These interactions and changes lead to a range of geophysical and geochemical phenomena. The goal of volcano monitoring is to detect and correctly interpret such phenomena in order to provide early and accurate warnings of impending eruptions. Given the well-documented hazards posed by volcanoes to both ground-based populations (for example, Blong, 1984; Scott, 1989) and aviation (for example, Neal and others, 1997; Miller and Casadevall, 2000), volcano monitoring is critical for public safety and hazard mitigation. Only with adequate monitoring systems in place can volcano observatories provide accurate and timely forecasts and alerts of possible eruptive activity. At most U.S. volcanoes, observatories traditionally have employed a two-component approach to volcano monitoring: (1) install instrumentation sufficient to detect unrest at volcanic systems likely to erupt in the not-too-distant future; and (2) once unrest is detected, install any instrumentation needed for eruption prediction and monitoring. This reactive approach is problematic, however, for two reasons. 1. At many volcanoes, rapid installation of new ground-1. based instruments is difficult or impossible. Factors that complicate rapid response include (a) eruptions that are preceded by short (hours to days) precursory sequences of geophysical and (or) geochemical activity, as occurred at Mount Redoubt (Alaska) in 1989 (24 hours), Anatahan (Mariana Islands) in 2003 (6 hours), and Mount St. Helens (Washington) in 1980 and 2004 (7 and 8 days, respectively); (b) inclement weather conditions, which may prohibit installation of new equipment for days, weeks, or even months, particularly at

  14. ITRAP - an international pilot study on border monitoring systems

    International Nuclear Information System (INIS)

    Beck, P.; Duftschmid, K.E.

    1999-01-01

    The paper describes the design and preliminary results of an extended pilot study of commercially available monitoring systems for the detection of nuclear and other radioactive materials at borders. The study consists of a laboratory test phase and field tests at the Austrian/Hungarian border and the Vienna airport, each for a duration of one year. The results will be used to derive realistic performance requirements for border control systems in view of optimized technical and economic conditions as well as to propose an 'investigation level'. The ITRAP study consists of three phases. In the first phase equipment currently available on the market is subjected to laboratory testing at the Austrian Research Centres Seibersdorf. The instrument categories include hand-held, portable, and fixed-installed equipment. The test criteria defined as minimum requirements have been established together with the manufacturers. The laboratory tests started in May 1998 and will last until end of this year. During the second phase, the field study, equipment passing the laboratory tests will be installed at a major Austrian-Hungarian border crossing (Nickelsdorf) for monitoring of cars, trucks and trains, as well as at the Vienna airport for pedestrians, luggage and cargo. In this phase the results gained from the lab tests about the 'fitness for use' will be verified in practice, in close co-operation with the law enforcement officers at the borders. Also training issues and questions of maintenance and support shall be evaluated. In the third phase, realistic specifications and performance requirements shall be derived with the help of international experts and selected specialists from the users and manufacturers. The results of the field study will focus not only on the technical aspects of monitoring equipment (e.g. detection threshold and rate of false alarms) but also on the operational (e.g. ease of use, reliability, training requirements, field support) and economic

  15. On-line monitoring system for I-131 manufacturing labs

    International Nuclear Information System (INIS)

    Osovizky, A.; Malamud, Y.; Paran, Y.; Tal, N.; Turgeman, S.; Weinstein, M.

    1997-01-01

    An on-line monitoring and safety system has been installed in a lab for manufacturing 1-131 capsules for nuclear medicine use. Production of up to 100mCi batches is performed in shielded glove boxes. The safety system is based on a unique, 'Medi SMARTS' system (Medical Survey Mapping Automatic Radiation Tracing System), that collects continuously the radiation measurements for processing, display, and storage for future retrieval. Radiation is measured by GM tubes, data is transferred to a data processing unit, and then via a RS-485 communication line to a computer. In addition to the operational advantages and radiation levels storage, the system is being evaluated for the purpose of identifying risky stages in the process. (authors)

  16. Microprocessor-based system for continuous monitoring of radiation levels around the CERN PS and PSB accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Agoritsas, V.; Beck, F.; Benincasa, G.P.; Bovigny, J.P.

    1986-06-01

    This paper describes a new beam loss monitor system which has been installed in the PS and PSB machines, replacing an earlier system. The new system is controlled by a microprocessor which can operate independently of the accelerator control system, though setting up and central display are usually done remotely, using the standard control system facilities.

  17. Groundwater quality monitoring well installation for Waste Area Grouping 3 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of 15 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 3. WAG 3 is located in Melton Valley, approximately 3,000 ft west of the west gate of Oak Ridge National Laboratory, and consists of an estimated 22 acres. The subject site contains three solid waste management units: the Contractors' Landfill, the Closed Scrap Metal Area, and Solid Waste Storage Area 3. The wells at WAG 3 were drilled and developed between September 1987 and August 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at WAG 3 were drilled with auger or air rotary rigs. Depending upon the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 3. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  18. airborne data analysis/monitor system

    Science.gov (United States)

    Stephison, D. B.

    1981-01-01

    An Airborne Data Analysis/Monitor System (ADAMS), a ROLM 1666 computer based system installed onboard test airplanes used during experimental testing is evaluated. In addition to the 1666 computer, the ADAMS hardware includes a DDC System 90 fixed head disk and a Miltape DD400 floppy disk. Boeing designed a DMA interface to the data acquisition system and an intelligent terminal to reduce system overhead and simplify operator commands. The ADAMS software includes RMX/RTOS and both ROLM FORTRAN and assembly language are used. The ADAMS provides real time displays that enable onboard test engineers to make rapid decisions about test conduct thus reducing the cost and time required to certify new model airplanes, and improved the quality of data derived from the test, leading to more rapid development of improvements resulting in quieter, safer, and more efficient airplanes. The availability of airborne data processing removes most of the weather and geographical restrictions imposed by telemetered flight test data systems. A data base is maintained to describe the airplane, the data acquisition system, the type of testing, and the conditions under which the test is performed.

  19. Long radiation detector system for beam loss monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Balsamo, J.; Fewell, N.M.; Klein, J.D.; Witkover, R.L.

    1977-01-01

    The Long Radiation Monitor (LRM) system installed at the 200 MeV linac at Brookhaven National Laboratory is described. This system allows observation of both the spatial and temporal character of the losses in the linac and its transport lines. An array of large diameter gas filled coaxial cables are used as extended ion chambers to detect the losses. The output signals are available as a histogram, video waveforms, and numerical data via the computer. A fast beam interrupt is also provided. The detector characteristics and details of the processing electronics are presented. Results of studies of longitudinal, steering and focusing losses are described.

  20. Long radiation detector system for beam loss monitoring

    International Nuclear Information System (INIS)

    Balsamo, J.; Fewell, N.M.; Klein, J.D.; Witkover, R.L.

    1977-01-01

    The Long Radiation Monitor (LRM) system installed at the 200 MeV linac at Brookhaven National Laboratory is described. This system allows observation of both the spatial and temporal character of the losses in the linac and its transport lines. An array of large diameter gas filled coaxial cables are used as extended ion chambers to detect the losses. The output signals are available as a histogram, video waveforms, and numerical data via the computer. A fast beam interrupt is also provided. The detector characteristics and details of the processing electronics are presented. Results of studies of longitudinal, steering and focusing losses are described

  1. CAVITY BEAM POSITION MONITOR SYSTEM FOR ATF2

    CERN Document Server

    Boogert, S T; Cullinan, F; Joshi, N; Lyapin, A; Aryshev, A; Honda, Y; Naito, T; Terunuma, N; Urakara, J; Heo, A; Kim, E-S; Kim, Y I; McCormick, D; Frisch, J; Nelson, J; Smith, T; White, G R

    2011-01-01

    The Accelerator Test Facility 2 (ATF2) in KEK, Japan, is a prototype scaled demonstrator system for the final focus required for a future high energy lepton linear collider. The ATF2 beam-line is instrumented with a total of 41 high resolution C and S band resonant cavity beam position monitors (BPM) with associated mixer electronics and digitisers. In addition 4 high resolution BPMs have been recently installed at the interaction point, we briefly describe the first operational experience of these cavities in the ATF2 beam-line. The current status of the overall BPM system is also described, with a focus on operational techniques and performance.

  2. Battery monitoring in Mexican hybrid power systems; Monitoreo de las baterias en sistemas de potencia hibridos Mexicanos

    Energy Technology Data Exchange (ETDEWEB)

    Flores, J. Roberto; Agredano, Jaime [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    Hybrid power systems for an autonomous power supply are based on different renewable and fossil energy sources. They are considered as a good option for the power supply of remote areas. In these systems an energy storage is a vital necessity and very often this storage will consist of batteries which are generally connected in series and parallel arrays, or both. In Mexico as in other countries, the most extensively use batteries used for this application are the stationary and electric car type deep cycle batteries. However the experience with them in these systems is generally not very good. One way to overcome this problem is to maintain a regular monitoring of installing monitoring equipment, in order to make preventive actions before a developing fault can have serious consequences and in this manner increase the practical lifetime of the batteries. Unfortunately, battery monitoring is not easy task because most of the hybrid power systems are installed in remote areas which makes it difficult and expensive. In Mexico it has been not possible to maintain a regular monitoring of all hybrid power systems installed, due to the high cost of this work and the lack of founds. The hybrid power systems installed in the state of Quintana Roo are the only systems that have been continuously monitored since their installation. This paper gives an overview of the hybrid power systems installed in Mexico, focusing in the battery banks, the way they are being monitored, the main parameters used to detect possible premature problems and the method used to evaluate the battery bank conditions. Finally some results from the battery banks monitoring activities are presented. [Espanol] Los sistemas de potencia hibridos para un suministro autonomo de energia a regiones remotas, estan basados en diferentes fuentes de energia fosiles y renovables. Estos son considerados como una buena opcion para el suministro de energia a areas remotas. En estos sistemas es una necesidad vital el

  3. Battery monitoring in Mexican hybrid power systems; Monitoreo de las baterias en sistemas de potencia hibridos Mexicanos

    Energy Technology Data Exchange (ETDEWEB)

    Flores, J Roberto; Agredano, Jaime [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    Hybrid power systems for an autonomous power supply are based on different renewable and fossil energy sources. They are considered as a good option for the power supply of remote areas. In these systems an energy storage is a vital necessity and very often this storage will consist of batteries which are generally connected in series and parallel arrays, or both. In Mexico as in other countries, the most extensively use batteries used for this application are the stationary and electric car type deep cycle batteries. However the experience with them in these systems is generally not very good. One way to overcome this problem is to maintain a regular monitoring of installing monitoring equipment, in order to make preventive actions before a developing fault can have serious consequences and in this manner increase the practical lifetime of the batteries. Unfortunately, battery monitoring is not easy task because most of the hybrid power systems are installed in remote areas which makes it difficult and expensive. In Mexico it has been not possible to maintain a regular monitoring of all hybrid power systems installed, due to the high cost of this work and the lack of founds. The hybrid power systems installed in the state of Quintana Roo are the only systems that have been continuously monitored since their installation. This paper gives an overview of the hybrid power systems installed in Mexico, focusing in the battery banks, the way they are being monitored, the main parameters used to detect possible premature problems and the method used to evaluate the battery bank conditions. Finally some results from the battery banks monitoring activities are presented. [Espanol] Los sistemas de potencia hibridos para un suministro autonomo de energia a regiones remotas, estan basados en diferentes fuentes de energia fosiles y renovables. Estos son considerados como una buena opcion para el suministro de energia a areas remotas. En estos sistemas es una necesidad vital el

  4. Groundwater quality monitoring well installation for Waste Area Grouping 17 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 17. WAG 17 is composed of approximately 23 acres and is located in Bethel Valley about 3,100 ft east of the Oak Ridge National Laboratory (ORNL) main plant area. The facilities in WAG 17 constitute the ORNL Services Area and include the shipping and receiving departments, machine shops, carpenter shops, paint shops, lead burning facilities, tritium facility, and the materials storage area. The wells at WAG 17 were drilled and developed between November 1989 and April 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 17. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG 17 characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  5. Sensor Buoy System for Monitoring Renewable Marine Energy Resources.

    Science.gov (United States)

    García, Emilio; Quiles, Eduardo; Correcher, Antonio; Morant, Francisco

    2018-03-22

    In this paper we present a multi-sensor floating system designed to monitor marine energy parameters, in order to sample wind, wave, and marine current energy resources. For this purpose, a set of dedicated sensors to measure the height and period of the waves, wind, and marine current intensity and direction have been selected and installed in the system. The floating device incorporates wind and marine current turbines for renewable energy self-consumption and to carry out complementary studies on the stability of such a system. The feasibility, safety, sensor communications, and buoy stability of the floating device have been successfully checked in real operating conditions.

  6. Work plan for ground water elevation data recorder/monitor well installation at the New Rifle Site, Rifle, Colorado

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the New Rifle Uranium Mill Tailings Remedial Action (UMTRA) Project site, Rifle, Colorado. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between the shallow aquifer and the Colorado River

  7. Design/installation and structural integrity assessment under the Federal Facility Agreement for Bethel Valley Low-Level Waste Collection and Transfer System upgrade for Building 2026 (High Radiation Level Analytical Laboratory) and Building 2099 (Monitoring and Control Station) at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1994-10-01

    This document presents a Design/Installation and Structural Integrity Assessment for a replacement tank system for portions of the Bethel Valley Low Level Waste (LLW) System, located at the Oak Ridge Reservation, Oak Ridge, Tennessee. This issue of the assessment covers the design aspects of the replacement tank system, and certifies that the design has sufficient structural integrity and is acceptable for the storing or treating of hazardous and/or radioactive substances. The present issue identifies specific activities that must be completed during the fabrication, installation, and testing of the replacement tank system in order to provide assurance that the final installation complies with governing requirements. Portions of the LLW system are several decades old, or older, and do not comply with current environmental protection regulations. Several subsystems of the LLW system have been designated to receive a state-of-the-art replacement and refurbishment. One such subsystem serves Building 2026, the High Radiation Level Analytical Laboratory. This assessment focuses on the scope of work for the Building 2026 replacement LLW Collection and Transfer System, including the provision of a new Monitoring and Control Station (Building 2099) to receive, store, and treat (adjust pH) low level radioactive waste

  8. Quality assurance in the structural installations of nuclear power stations

    International Nuclear Information System (INIS)

    Schnellenbach, G.; Wrage, S.

    1985-01-01

    The concept of quality assurance distinguishes between self-monitoring of the design, manufacturing and executing firms and external monitoring by state institutions or by experts commissioned by them. The long-term control of structures is within the area of responsibility of the owner. This quality assurance concept is controlled in detail by statutes, which clearly define responsibilities. This structural engineering quality assurance system also forms the basis for the design, construction and utilization of structural installations of nuclear power stations; requirements emanating from the Atomic Energy Acts for the structural installations demand, however, to some extent a sharpening of self- and external monitoring. Therefore, today a quality concept has been developed for the important engineering safety-related buildings of nuclear power stations. This concept takes account of the strict requirements imposed and fulfils the requirement of KTA 1401. (orig.) [de

  9. Installation Guidelines for Solar DHW Systems in One- and Two-Family Dwellings. Second Edition.

    Science.gov (United States)

    Hollander, Peter; And Others

    Described are some of the better techniques for installing solar domestic hot water (DHW) systems. By using these guidelines, along with the manufacturer's manual, professional installation contractors and skilled homeowners should be able to install and fill a solar DHW system. Among the topics considered are system layouts, siting, mounting…

  10. Woking Park PAFC CHP monitoring. Phase 1: Planning, installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Goulding, P S; Fry, M R

    2003-07-01

    This report covers the planning, installation and commissioning of the first commercially operated fuel cell cogeneration system in the UK. The involvement of Woking Borough Council, its approach to energy efficiency, and the Woking Park site are discussed, and details are given of the PC25/C 200kW fuel cell which is manufactured in the US by UTC Fuel Cells. A description of the Woking Park fuel cell combined heat and power application is presented, and the project economics, specification and tendering are examined. The route taken to planning approval is traced, and installation procedures are outlined. The testing of the phosphoric type PC25 fuel cell cogeneration unit is described, and expected cost and project timescales are noted.

  11. Input-output analysis for installing renewable energy systems

    International Nuclear Information System (INIS)

    Itoh, Y.; Nakata, T.

    2004-01-01

    Renewable energy facilities have been installed in many regions, because of their possibility to be an alternative to fossil fuels for mitigating global warming. Besides the profitability of renewable energy businesses, indirect economic effects of installing renewable energy facilities should be clarified. This study examines the possibility that the renewable energy facilities give renewed impetus to regional economic progress. The economic effects are analysed with input-output techniques in a rural area in Japan. As a consequence, both positive and negative effects on the rural economy are derived. In addition, we will focus on the changes in sectors such as construction, business services, banking, etc. as a result of economic activities for renewable systems. The business benefits of renewable energy system are discussed. (author)

  12. Procedures for the collection and preservation of groundwater and surface water samples and for the installation of monitoring wells

    International Nuclear Information System (INIS)

    Korte, N.; Kearl, P.

    1984-01-01

    Proper sampling procedures are essential for a successful water-quality monitoring program. It must be emphasized, however, that it is impossible to maintain absolutely in-situ conditions when collecting and preserving a water sample, whether from a flowing stream or an aquifer. Consequently, the most that can reasonably be expected is to collect a best possible sample with minimal disturbance. This document describes procedures for installing monitoring wells and for collecting samples of surface water and groundwater. The discussion of monitoring wells includes mention of multilevel sampling and a general overview of vadose-zone monitoring. Guidelines for well installation are presented in detail. The discussion of water-sample collection contains evaluations of sampling pumps, filtration equipment, and sample containers. Sample-preservation techniques, as published by several government and private sources, are reviewed. Finally, step-by-step procedures for collection of water samples are provided; these procedures address such considerations as necessary equipment, field operations, and written documentation. Separate procedures are also included for the collection of samples for determination of sulfide and for reactive aluminum. The report concludes with a brief discussion of adverse sampling, conditions that may significantly affect the quality of the data. Appendix A presents a rationale for the development and use of statistical considerations in water sampling to ensure a more complete water quality monitoring program. 51 references, 9 figures, 4 tables

  13. Monitoring commercial conventional facilities control with the APS control system: The Metasys-to-EPICS interface

    International Nuclear Information System (INIS)

    Nawrocki, G.J.; Seaver, C.L.; Kowalkowski, J.B.

    1995-01-01

    As controls needs at the Advanced Photon Source matured from an installation phase to an operational phase, the need to monitor the existing conventional facilities control system with the EPICS-based accelerator control system was realized. This existing conventional facilities control network is based on a proprietary system from Johnson Controls called Metasys. Initially read-only monitoring of the Metasys parameters will be provided; however, the ability for possible future expansion to full control is available. This paper describes a method of using commercially available hardware and existing EPICS software as a bridge between the Metasys and EPICS control systems

  14. An alternative approach to continuous compliance monitoring and turbine plant optimization using a PEMS (predictive emission monitoring system)

    International Nuclear Information System (INIS)

    Swanson, B.G.; Lawrence, P.

    2009-01-01

    This paper reviewed the use of a predictive emissions monitoring system (PEMS) at 3 different gas turbine facilities in the United States and highlighted the costs and benefits of using a PEMS for documenting emissions of priority pollutants and greenhouse gases (GHG). The PEMS interfaces directly to the turbine control system and represents a lower cost alternative to the traditional continuous emission monitoring system (CEMS). The PEMS can track combustion efficiency through modeling of the turbine's operation and emissions. Excess emissions can be tracked and the causes of pollution can be determined and mitigated. The PEMS installed at the 3 turbine plants must meet rigorous performance specification criteria and the sites perform ongoing quality assurance tasks such as periodic audits with portable analyzers. The PEMS is much less expensive to install, operate, and maintain compared to the standard CEMS gas analyzer. Empirical PEMS achieves very high accuracy levels and has demonstrated superior reliability over CEMS for various types of continuous process applications under existing air compliance regulations in the United States. Annual accuracy testing at the gas turbine sites have shown that the PEMS predictions are usually within 5 per cent of the reference method. PEMS can be certified as an alternative to gas analyzer based CEMS for nitrogen oxides and carbon dioxide compliance and for GHG trading purposes. 5 refs., 8 figs.

  15. Regional Information System for Educators: Installation and Evaluation.

    Science.gov (United States)

    Kromer, Charles

    This document describes the installation and evaluation of the Regional Information System within the Michigan-Ohio Regional Educational Laboratory (MOREL). MOREL is an agency established to develop and test alternatives to current educational practice under Title IV of ESEA. The Regional Information System was established to provide referrals to…

  16. Fires of sodium installations

    International Nuclear Information System (INIS)

    Hajek, L.; Tlalka, R.

    1984-01-01

    A survey is presented of the literature dealing with fires of sodium installations between 1974 and 1981. Also described are three experimental fires of ca 50 kg of sodium in an open area, monitored by UJV Rez. The experimental conditions of the experiments are described and a phenomenological description is presented of the course of the fires. The experiments showed a relationship between wind velocity in the area surrounding the fire and surface temperature of the sodium flame. Systems analysis methods were applied to sodium area, spray and tube fires. (author)

  17. Demonstration of the importance of a dedicated neutron beam monitoring system for BNCT facility

    International Nuclear Information System (INIS)

    Chao, Der-Sheng; Liu, Yuan-Hao; Jiang, Shiang-Huei

    2016-01-01

    The neutron beam monitoring system is indispensable to BNCT facility in order to achieve an accurate patient dose delivery. The neutron beam monitoring of a reactor-based BNCT (RB-BNCT) facility can be implemented through the instrumentation and control system of a reactor provided that the reactor power level remains constant during reactor operation. However, since the neutron flux in reactor core is highly correlative to complicated reactor kinetics resulting from such as fuel depletion, poison production, and control blade movement, some extent of variation may occur in the spatial distribution of neutron flux in reactor core. Therefore, a dedicated neutron beam monitoring system is needed to be installed in the vicinity of the beam path close to the beam exit of the RB-BNCT facility, where it can measure the BNCT beam intensity as closely as possible and be free from the influence of the objects present around the beam exit. In this study, in order to demonstrate the importance of a dedicated BNCT neutron beam monitoring system, the signals originating from the two in-core neutron detectors installed at THOR were extracted and compared with the three dedicated neutron beam monitors of the THOR BNCT facility. The correlation of the readings between the in-core neutron detectors and the BNCT neutron beam monitors was established to evaluate the improvable quality of the beam intensity measurement inferred by the in-core neutron detectors. In 29 sampled intervals within 16 days of measurement, the fluctuations in the mean value of the normalized ratios between readings of the three BNCT neutron beam monitors lay within 0.2%. However, the normalized ratios of readings of the two in-core neutron detectors to one of the BNCT neutron beam monitors show great fluctuations of 5.9% and 17.5%, respectively. - Highlights: • Two in-core neutron detectors and three BNCT neutron beam monitors were compared. • BNCT neutron beam monitors improve the stability in neutron

  18. AET III 100 kWp photovoltaic installation in Riazzino - Results of monitoring; Monitoraggio dell'impianto PV da 100 kWp AET III a Riazzino

    Energy Technology Data Exchange (ETDEWEB)

    Rezzonico, S.; Bura, E.

    2005-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a monitoring project that monitored the performance of the 100 kWp, grid-connected photovoltaic installation in Riazzino in southern Switzerland. The original installation, dating from 1992, was refurbished with three new inverters and new cabling. The results of a three-year monitoring project are presented and discussed. Figures are presented on the plant's power production, which illustrate the improved performance of the new inverters. Further investigations made on the power ratings of the modules and the results of infrared examination are discussed.

  19. Portable system for periodical verification of area monitors for neutrons; Sistema portatil para verificacao periodica de monitores de area para neutrons

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Luciane de R.; Leite, Sandro Passos; Lopes, Ricardo Tadeu, E-mail: rluciane@ird.gov.b [Coordenacao dos Programas de Pos-Graduacao de Engenharia (PEN/COPPE/UFRJ), RJ (Brazil). Programa de Energia Nuclear; Patrao, Karla C. de Souza; Fonseca, Evaldo S. da; Pereira, Walsan W., E-mail: karla@ird.gov.b [Instituto de Radioprotecao e Dosimetria (IRD/CNEN-RJ), Rio de Janeiro, RJ (Brazil). Lab. Nacional de Metrologia das Radiacoes Ionizantes (LNMRI). Lab. de Neutrons

    2009-07-01

    The Neutrons Laboratory develops a project viewing the construction of a portable test system for verification of functioning conditions of neutron area monitors. This device will allow to the users the verification of the calibration maintenance of his instruments at the use installations, avoiding the use of an inadequate equipment related to his answer to the neutron beam response

  20. Chemistry monitoring and diagnostic system at NPP Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Smiesko, Ivan; Figedy, Stefan

    2012-09-01

    This paper provides a description of water chemistry monitoring and diagnostic system installed at Slovak NPP Jaslovske Bohunice. System has complex architecture and covers laboratory data, chemistry and radiochemistry on-line monitoring data, process data acquisition and processing and diagnostics. Pre-filtered data from process computer and chemistry on-line monitors are recorded together with laboratory data in the ORACLE-based information system CHEMIS with many presentation and processing features. Brief information is given about the basic features of a newly developed diagnostic system for early detection and identification of anomalies incoming in the water chemistry regime of the primary and secondary circuit of VVER-440 type unit. This system, called SACHER (System of Analysis of Chemical Regime) has been installed within the major modernization project at the NPP Bohunice in the Slovak Republic. System SACHER has been developed fully in MATLAB environment. Diagnostic system works exclusively with available on-line data as an operation personnel support application allowing effective response to adverse chemistry events/trends. The availability of prompt information about the chemical conditions of the primary and secondary circuit is very important in order to prevent the undue corrosion and deposit build-up processes within the plant systems. The typical chemical information systems that exist and work at the NPPs give the user values of the measured quantities together with their time trends and other derived values. It is then the experienced user's role to recognize the situation the monitored process is in and make the subsequent decisions and take the measures. The SACHER system, based on the computational intelligence techniques, inserts the elements of intelligence into the overall chemical information system. It has the modular structure with the following most important modules: - normality module- its aim is to recognize that the process

  1. Islay LIMPET project monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Heath, T.

    2002-07-01

    Wavegen was contracted by the DTI as part of its Sustainable Energy Programmes to monitor and report on the final stages of the construction, installation of turbo-generation equipment, commissioning and operation of the LIMPET wave energy system. The report discusses the choice of technology, where the system was installed, power take off, construction of the collector, installation of the turbo-generator, maintenance, operation, management and planning issues. The performance of the system was found to be poorer than expected and the reasons for this were identified. The main conclusions were that the system is sufficiently robust to operate in the marine environment and downtimes are expected to be short.

  2. Electronics and Calibration system for the CMS Beam Halo Monitor

    CERN Document Server

    Tosi, Nicolò; Fabbri, Franco L; Finkel, Alexey; Orfanelli, Stella; Loos, R; Montanari, Alessandro; Rusack, R; Stickland, David P

    2014-01-01

    In the context of increasing luminosity of LHC, it will be important to accurately measure the Machine Induced Background. A new monitoring system will be installed in the cavern of the Compact Muon Solenoid (CMS) experiment for measuring the beam background at high radius. This detector is composed of synthetic quartz Cherenkov radiators, coupled to fast photomultiplier tubes (PMT). The readout chain of this detector will make use of many components developed for the Phase 1 upgrade to the CMS Hadron Calorimeter electronics, with a dedicated firmware and readout adapted to the beam monitoring requirements. The PMT signal will be digitized by a charge integrating ASIC (QIE10), providing both the signal rise time and the charge integrated over one bunch crossing. The backend electronics will record bunch-by-bunch histograms, which will be published to CMS and the LHC using the newly designed CMS beam instrumentation specific DAQ. A calibration monitoring system has been designed to generate triggered pulses of...

  3. Radiation mapping of Jaipur city using compact aerial radiation monitoring system (CARMS) installed in mobile platform

    International Nuclear Information System (INIS)

    Jain, Amit; Chaudhury, Probal; Padmanabhan, N.; Pradeepkumar, K.S.; Sharma, D.N.; Thandra, Manu

    2010-01-01

    Full text: Widespread use of radioisotopes for social benefits through industrial, scientific and medical applications poses a potential for occurrence of radiological emergencies due to loss or misuse of the radioactive sources. Besides, as there is increased societal concern for radiation safety of man and environment, monitoring is needed as a confidence building measure. It is necessary to assess any possible increase in background radiation due to the operation of nuclear facilities or any other man made events. Any observable increase in normal radiation background is a precursor for the abnormal presence of radioactivity. As a part of emergency preparedness for response to radiological emergencies, BARC has taken up radiation mapping of all major cities. A mobile ground based radiation monitoring has been conducted around Jaipur city using state-of-the-art radiation monitoring systems and instruments. The systems were mounted in a vehicle at a height of 1.0 meter from the ground and the GPS antenna was mounted on top for clear satellite visibility. It was ensured that the gamma attenuation due to the body of the vehicle was minimal. The average speed of the vehicle was maintained at 30 km/h to ensure uniformity in distance during the data acquisition interval. The monitoring was carried out over two days and resulted in establishment of baseline dose rate data of the city, which will be useful in case of any radiological emergency. The detailed environmental radiation monitoring demonstrated the utility of the systems and the methodology for the assessment of large area ground contamination and also search and detection of any orphan radioactive sources through variations in background gamma radiation observations. The methodology adopted for analysis of the surveyed data is based on the interpretation of the changes in the mean value and standard deviation in the values in different regions of the surveyed area. During this monitoring exercise, total road

  4. Investigation on Prefabricated Building System Skilled Component Installers

    Directory of Open Access Journals (Sweden)

    Nurul Rezuana Buyung

    2013-09-01

    Full Text Available In the face of an increasingly challenging era of globalization, skills and new equipments which includes prefabricated building components, known as Industrialized Building System (IBS has been introduced towards achievement of sustainable construction. IBS is a construction system in which the components are manufactured in a factory, on or off site, positioned and assembled into complete structures with minimal additional site work. IBS requires high construction precision and needs a higher skill level of workers. Compared to the conventional construction method, the skill level of IBS workers is more demanding. Although there are a lot benefits in implementing IBS, the construction industry still not rapidly implementing IBS. The IBS method still considered new and even though there are a lot of benefits it still faces barriers. In an IBS construction, the role of the contractor is shifted from a builder to an assembler on the site. Therefore, this requires the contractor to be prepared technologically with IBS knowledge and skills. It is generally perceived that the number of skilled IBS installers in Malaysia is still low even though the system has been implemented for a long time. This research is carried out to find out whether the existing number of IBS installer is sufficient. Primary data was collected by carrying out interviews with the contractors at the IBS construction site in Penang Island in order to get the contractor’s feedback regarding this issue. Meanwhile, the secondary data was collected from government agencies to get the number of existing IBS installer and the number of IBS projects done in government projects. The results from this study indicated that not all categories of skill workers are in shortage. However, the number of precast concrete installer is in a critical shortage.

  5. Groundwater quality monitoring well installation for Waste Area Grouping 4 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.

    1994-09-01

    This report documents the drilling and installation of 15 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 4. WAG 4 is comprised of about 27 acres located in Melton Valley approximately 2700 ft southwest of the Oak Ridge National Laboratory main plant. It contains three inactive solid waste management units: (1) the abandoned intermediate level liquid waste transfer line located along the WAG's northwestern boundary, (2) the experimental pilot pit area, and (3) SWSA 4, the largest unit in the WAG. The wells at WAG 4 were drilled and developed between September 1987 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy (DOE), state, and Environmental Protection Agency regulatory requirements. The wells at WAG 4 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 4. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  6. A microprocessor-based system for continuous monitoring of radiation levels around the CERN PS and PSB accelerators

    Science.gov (United States)

    Agoritsas, V.; Beck, F.; Benincasa, G. P.; Bovigny, J. P.

    1986-06-01

    This paper describes a new beam loss monitor system which has been installed in the PS and PSB machines, replacing an earlier system. The new system is controlled by a microprocessor which can operate independently of the accelerator control system, though setting up and central display are usually done remotely, using the standard control system facilities.

  7. Solar hot water system installed at Las Vegas, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    The solar hot water system installed at LaQuinta Motor Inn Inc., at Las Vegas, Nevada is described. The Inn is a three-story building with a flat roof for installation of the solar panels. The system consists of 1200 square feet of liquid flat plate collectors, a 2500 gallon insulated vertical steel storage tank, two heat exchangers and pumps and controls. The system was designed to supply approximately 74 percent of the total hot water load.

  8. New system of the in core monitoring - PTK SVRK

    International Nuclear Information System (INIS)

    Urban, P.

    2000-01-01

    In this paper author describes new system (PTK SVRK) for in-core monitoring system of the Mochovce nuclear power plant installed instead of the HINDUKUSH in-core monitoring system, which are determined to monitor the core parameters. This system (HINDUKUSH), supplied by the Russian party in scope of the original design, became old during the idle time, and the components, which is it built from, are not produced any more. Thus, its utilisation had to undergo a technical end economic analysis. It resulted in classification to the work complex of the technical specification of safety measures. Its implementation conditioned the commissioning of the power plant nuclear unit. The program and technical system of the in-core monitoring (PTK SVRK) consists of two levels - a 'closed' basic, which fulfils the task of the primal system operation for the Unit operators, and an 'open' top level, which serves as a tool for the additional tasks of a prognosis, monitoring, and analysis of the processes taking place in the nuclear core by the monitoring physicists. The basic level of PTK SVRK has 100% redundancy because of its composition and configuration. It is namely formed by two identical, equivalent, and independent sets. Any of them may be operational or redundant. Every set consists of an apparatus processing the signals coming from the technology or the calculation complex, which converts these signals to physical parameters and controls the physically mathematical model of the monitored equipment. The results are presented to the operational staff as outputs on the workstations in the control room in a form of cartograms, graphs, histograms, tables, etc. The bases of the system calculation model are time-proven programs BIPR7 and PERMAK, which are used also in this power plant. The top level of PTK SVRK has a structure supporting the system openness for its further utilisation. Today it is formed by a server and two workstations. Besides the above-mentioned tasks, the

  9. Geomechanical monitoring system at the Waste Isolation Pilot Plant, Carlsbad, New Mexico

    International Nuclear Information System (INIS)

    Francke, J.L.; Cook, R.F.; Carrasco, R.C.

    1993-01-01

    This paper describes in detail the geomechanical instrumentation system and the data base that has been established from the geomechanical monitoring program. In addition, it describes the quality assurance and control measures that are in place to ensure that the data from the underground is accurate, traceable, and defensible. The system is installed at the Waste Isolation Pilot Plant in Carlsbad, New Mexico. This facility is being developed for the disposal of transuranic nuclear wastes in underground excavations in salt 2150 feet below the surface. The purpose of the instrumentation system is to monitor the deformations and stress changes that are occurring in the rock with time. This information is needed to routinely assess conditions in the facility and to ensure that safe operating conditions are maintained

  10. An advanced NSSS integrity monitoring system for Shin-Kori nuclear units 3 and 4

    International Nuclear Information System (INIS)

    Oh, Y. G.; Kim, H. B.; Galin, S. R.; Kim, S. H.; Lee, S. J.

    2009-01-01

    The advanced design features of NSSS (Nuclear Steam Supply System) Integrity Monitoring System for Shin-Kori Nuclear Units 3 and 4 are summarized herein. During the overall system design and detailed component design processes, many design improvements have been made for the system. The major design changes are: 1) the application of a common software platform for all subsystems, 2) the implementation of remote access, control and monitoring capabilities, and 3) the equipment redesign and rearrangement that has simplified the system architecture. Changes give an effect on cabinet size, number of cables, cyber-security, graphic user interfaces, and interfaces with other monitoring systems. The system installation and operation for Shin-Kori Nuclear Units 3 and 4 will be more convenient than those for previous Korean nuclear units in view of its remote control capability, automated test functions, improved user interface functions, and much less cabling. (authors)

  11. An Advanced NSSS Integrity Monitoring System for Shin-Kori Nuclear Units 3 and 4

    Science.gov (United States)

    Oh, Yang Gyun; Galin, Scott R.; Lee, Sang Jeong

    2010-12-01

    The advanced design features of NSSS (Nuclear Steam Supply System) Integrity Monitoring System for Shin-Kori Nuclear Units 3 and 4 are summarized herein. During the overall system design and detailed component design processes, many design improvements have been made for the system. The major design changes are: 1) the application of a common software platform for all subsystems, 2) the implementation of remote access, control and monitoring capabilities, and 3) the equipment redesign and rearrangement that has simplified the system architecture. Changes give an effect on cabinet size, number of cables, cyber-security, graphic user interfaces, and interfaces with other monitoring systems. The system installation and operation for Shin-Kori Nuclear Units 3 and 4 will be more convenient than those for previous Korean nuclear units in view of its remote control capability, automated test functions, improved user interface functions, and much less cabling.

  12. Operating results for the beam profile monitor system currently in use at Bevalac Facility

    International Nuclear Information System (INIS)

    Stover, G.; Fowler, K.

    1987-03-01

    Three stations of a soon to be completed multi-station, multi-wire beam monitoring system have been installed in the Bevalac transfer line. The following article will provide a cursory analysis of the electronic circuitry, discuss new design additions and summarize the operating results obtained over the last year

  13. The BEACON on-line core monitoring system. Functional upgrades and applications

    International Nuclear Information System (INIS)

    Boyd, W.A.; Miller, R.W.

    1997-01-01

    The BEACON TM core monitor system has been in commercial operation since 1989 and was licensed by the USNRC for on-line core power distribution and thermal power limit monitoring in 1994. Since that time BEACON has been installed at 17 plants. Each of these customers has a different perspective on the use of data from BEACON and a different approach on the application of BEACON to support their plant operations. To support these varied needs and approaches the BEACON system has been divided into three operational levels to better match the system functions to the customer needs and approaches to system integration. Based on customer feedback, the BEACON system was upgraded in some areas and streamlined in other areas to better support the needs of each customer. The three operational levels of the BEACON system, the major product upgrades and system evolution that has taken place to support the needs and applications of our customers are discussed. (authors)

  14. Usage of aids monitoring in automatic braking systems of modern cars

    Directory of Open Access Journals (Sweden)

    Dembitskyi V.

    2016-08-01

    Full Text Available Increased safety can be carried out at the expense the installation on vehicles of automatic braking systems, that monitor the traffic situation and the actions of the driver. In this paper considered the advantages and disadvantages of automatic braking systems, were analyzed modern tracking tools that are used in automatic braking systems. Based on the statistical data on accidents, are set the main dangers, that the automatic braking system will be reduced. In order to ensure the accuracy of information conducted research for determination of optimal combination of different sensors that provide an adequate perception of road conditions. The tracking system should be equipped with a combination of sensors, which in the case of detection of an obstacle or dangers of signal is transmitted to the information processing system and decision making. Information from the monitoring system should include data for the identification of the object, its condition, the speed.

  15. Fiscal Year 1998 Well Installation, Plugging and Abandonment, and Redevelopment summary report Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    This report summarizes the well installation, plugging and abandonment, and redevelopment activities conducted during the federal fiscal year (FY) 1998 at the Y-12 Plant, Oak Ridge, Tennessee. Five new groundwater monitoring wells were installed at the Y-12 Plant under the FY 1998 drilling program. Two of the wells are located in west Bear Creek Valley, one is in the eastern Y-12 Plant area near Lake Reality, and two are located near the Oil Landfarm Waste Management Area, which were installed by Bechtel Jacobs Company LLC (Bechtel Jacobs) as part of a site characterization activity for the Oak Ridge Reservation (ORR) Disposal Cell. Also, two existing wells were upgraded and nine temporary piezometers were installed to characterize hydrogeologic conditions at the Disposal Cell site. In addition, 40 temporary piezometers were installed in the Boneyard/Bumyard area of Bear Creek Valley by Bechtel Jacobs as part of the accelerated remedial actions conducted by the Environmental Restoration Program. Ten monitoring wells at the Y-12 Plant were decommissioned in FY 1998. Two existing monitoring wells were redeveloped during FY 1998 (of these, GW-732 was redeveloped tsvice). All well installation and development (including redevelopment) was conducted following industry-standard methods and approved procedures from the Environmental Surveillance Procedures Quality Control Program (Energy Systems 1988); the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1992); and the Monitoring Well Installation Plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee (Energy Systems 1997a). Well installation and development of the non-Y-12 Plant GWPP oversight installation projects were conducted using procedures/guidance defined in the following documents: Work Plan for Support to Upper East Fork Poplar Creek East End Volatile Organic Compound Plumes Well Installation Project, Oak Ridge Y-12 Plant, Oak Ridge

  16. Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.

    Energy Technology Data Exchange (ETDEWEB)

    Lum, Clinton C. L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-05-01

    This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Work Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.

  17. Early evaluation of a second generation information monitoring and diagnostic system

    Energy Technology Data Exchange (ETDEWEB)

    Piette, Mary Ann; Kinney, Satkartar; Bourassa, Norman; Xu, Peng; Haves, Philip; Kinney, Kristopher; Shockman, Christine

    2002-03-25

    Private sector commercial office buildings are challenging environments for energy efficiency projects. This challenge is related to the complexity of business environments that involve ownership, operation, and tenant relationships. Whether it is poor quality design, inefficient operations, degradation of equipment over time, or merely the increasing use of energy by tenants and inattention from landlords, commercial office building energy use continues to increase. This research project was developed to examine the environment for building operations and identify causes of inefficient use of energy related to technical and organizational issues. This report discusses a second-generation Information Monitoring and Diagnostic System (IMDS) installed at a leased office building in Sacramento, California. The report begins with a brief summary of the IMDS research at the previous building, followed by a discussion of the building selection process, the IMDS design and installation, recent use of the IMDS, costs and benefits, and fault detection and diagnostic research using the IMDS. A web site describes the IMDS in detail (see imds.lbl.gov). The underlying principle of this research project is that high quality building performance data can help show where energy is being used and how buildings systems actually perform is an important first step toward improving building energy efficiency. The project utilizes a high-quality monitoring system that has been developed during the past decade by a partnership between LBNL and private industry. This research project has been successful in demonstrating that the IMDS is tremendously valuable to the building operators at the Sacramento site. The building operators not only accept the technology, but it has become the core of their day-to-day building control concepts. The innovative property management company, Jones Lang LaSalle, is interested in installing more sites to determine if the system could provide an economic

  18. Development of an X Window based operator's interface for a core monitoring system

    International Nuclear Information System (INIS)

    Vegh, J.; Huszar, J.; Laz, J.

    1992-09-01

    The components, functioning and programming concepts of the man-machine interface applied in an upgraded version of the core monitoring system and reactor information system VERONA for WWER-440 type nuclear power reactors, installed at the Paks Nuclear Power Plant, are described. The application of the X Window standard Graphical User Interface facilitated modular interface design and made program development easier and faster. (author) 3 refs.; 13 figs

  19. Photovoltaics for professionals solar electric systems marketing, design and installation

    CERN Document Server

    Falk, Antony; Remmers, Karl-Heinz

    2007-01-01

    For the building industry, the installation of photovoltaic systems has become a new field of activity. Interest in solar energy is growing and future business prospects are excellent. Photovoltaics for Professionals describes the practicalities of marketing, designing and installing photovoltaic systems, both grid-tied and stand-alone. It has been written for electricians, technicians, builders, architects and building engineers who want to get involved in this expanding industry. It answers all the beginner's questions as well as serving as a textbook and work of reference

  20. SCORPIO-VVER core monitoring and surveillance system with advanced capabilities

    International Nuclear Information System (INIS)

    Molnar, J.; Vocka, R.

    2009-01-01

    The SCORPIO-VVER system includes following features: 1) Validation of plant measurements and identification of sensor failures. 2) Optimum combination of measurements and calculations to obtain precise values of important parameters. 3) On-line 3D power distribution calculation with pin power reconstruction. 4) Limit checking and thermal margin calculation allowing for surveillance of VVER core limits such as DNBR, Sub-cooling margin, FdH and FQ peeking factors. 5) Integrated modules for monitoring fuel performance and coolant activity for identification of fuel failures. 6) Predictive capabilities and strategy planning, offering the possibility to check the consequences of operational manoeuvres in advance, prediction of critical parameters, etc. 7) Convenient monitoring of approach to criticality during reactor start-up. 8) Automated transition between cycles (fuel reload). The SCORPIO-VVER core monitoring system with its flexible and modular framework successfully responses to the plant operating needs and advances in nuclear fuel cycle strategies and fuel design. Modular framework allows for easy modifications of the system and implementation of new methods in physical modules. Even if the system is installed only on VVER-440 reactors, it could be adapted for VVER-1000 needs

  1. Alarm points for fixed oxygen monitors

    International Nuclear Information System (INIS)

    Miller, G.C.

    1987-05-01

    Oxygen concentration monitors were installed in a vault where numerous pipes carried inert cryogens and gases to the Mirror Fusion Test Facility (MFTF-B) experimental vessel at Lawrence Livermore National Laboratory (LLNL). The problems associated with oxygen-monitoring systems and the reasons why such monitors were installed were reviewed. As a result of this review, the MFTF-B monitors were set to sound an evacuation alarm when the oxygen concentration fell below 18%. We chose the 18% alarm criterion to minimize false alarms and to allow time for personnel to escape in an oxygen-deficient environment

  2. A computerised recording and monitoring system for extensive air shower experiments

    International Nuclear Information System (INIS)

    Naranan, S.; Rao, M.V.S.; Sivaprasad, K.; Subramaniam, P.B.

    1975-01-01

    A digital computer, TDC-12, with a memory capacity of 8 K 12-bit words and memory cycle time of 2 μs has been installed at the Cosmic Ray Laboratory at Kolar Gold Fields, India for real time operation with the KGF Air Shower Experiment. The computer system records the selected events and monitors and calibrates all the 90 detectors of various types in real time. (orig./WL) [de

  3. Targets of operation monitoring

    International Nuclear Information System (INIS)

    Wenger, H.

    1997-01-01

    The condition monitoring system of a nuclear power plant should be an assurance for the user and the authorities that the safety of the installation constantly corresponds to the nominal condition. As soon as deviations from these conditions occur, it should quickly provide fundamentals for corrective measures. It contributes to a high degree of availability of the installation and makes safe and economical operation throughout the whole life of the installation possible. (author) 1 fig

  4. The replacement gag vibration monitoring system for Hinkley Point 'B' power station

    International Nuclear Information System (INIS)

    Bagwell, T.; Morrish, M.F.G.

    1985-01-01

    The original computerised system for monitoring the vibration of gags in each reactor channel of the Hinkley Point 'B' AGR Power Station did not meet the specification for a more stringent safety requirement. This paper describes the replacement of that original single processor system with an enhanced dual processor/multiple scanner computer system used to satisfy this new safety and reliability need. The specification and installation of the new hardware and software are discussed, and some of the problems encountered and their solutions are highlighted. (author)

  5. Resolution of a High Performance Cavity Beam Position Monitor System

    International Nuclear Information System (INIS)

    Walston, S.; Chung, C.; Fitsos, P.; Gronberg, J.; Ross, M.; Khainovski, O.; Kolomensky, Y.; Loscutoff, P.; Slater, M.; Thomson, M.; Ward, D.; Boogert, S.; Vogel, V.; Meller, R.; Lyapin, A.; Malton, S.; Miller, D.; Frisch, J.; Hinton, S.; May, J.; McCormick, D.; Smith, S.; Smith, T.; White, G.; Orimoto, T.; Hayano, H.; Honda, Y.; Terunuma, N.; Urakawa, J.

    2005-01-01

    International Linear Collider (ILC) interaction region beam sizes and component position stability requirements will be as small as a few nanometers. It is important to the ILC design effort to demonstrate that these tolerances can be achieved - ideally using beam-based stability measurements. It has been estimated that RF cavity beam position monitors (BPMs) could provide position measurement resolutions of less than one nanometer and could form the basis of the desired beam-based stability measurement. We have developed a high resolution RF cavity BPM system. A triplet of these BPMs has been installed in the extraction line of the KEK Accelerator Test Facility (ATF) for testing with its ultra-low emittance beam. A metrology system for the three BPMs was recently installed. This system employed optical encoders to measure each BPM's position and orientation relative to a zero-coefficient of thermal expansion carbon fiber frame and has demonstrated that the three BPMs behave as a rigid-body to less than 5 nm. To date, we have demonstrated a BPM resolution of less than 20 nm over a dynamic range of +/- 20 microns

  6. Development of a VxWorks-based distributed power quality monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Shin, M.J.; Kim, S.J.; Son, Y.I.; Kang, S.H. [Myongji Univ., Yongin (Korea, Republic of). Next-generation Power Technology Center

    2007-07-01

    Electric utilities are becoming increasingly concerned about power quality because end user equipment is more sensitive to disturbances within the power supply system and also within the consumer facilities. In order to improve the quality of electricity, the sources and causes of disturbances must be known. However, voltage sag and swell, wave-faults and momentary interruptions are difficult to detect and avoid unless power quality monitoring devices are installed permanently. The impact that alternative energy sources have on power quality was also discussed. When distributed generation is connected to the power grid, it can generate and supply more reliable power to the grid. For a reliable interconnection of distributed power to the grid, monitoring systems should display the status of distributed power and record power events. Lack of source stability in distributed generation such as solar-cells or wind-power creates events that should be measured and stored immediately. This paper presented a newly developed real-time power quality monitoring system for distributed power systems. The system is based on a real-time operating system (OS) and can therefore handle many events that happen simultaneously. The proposed system contains a digital signal processor (MPC7410, Motorola) and an A/D board (VMIVME3122, GE). VxWorks was used to implement the monitoring algorithm. This paper outlined the structure and the functions of the developed Distributed Power Quality Monitoring System. Some experiments were conducted to test the performance of the proposed system. According to test results, the system is compatible with standards of the Institute of Electrical and Electronics Engineers (IEEE) for power quality monitoring. 15 refs., 1 tab., 18 figs.

  7. Citizen-based environmental radiation monitoring network

    International Nuclear Information System (INIS)

    Alemayehu, B.; Mckinzie, M.; Cochran, T.; Sythe, D.; Randrup, R.; Lafargue, E.

    2017-01-01

    This paper discusses a Citizen Radiation Monitoring project designed and implemented by the Natural Resources Defense Council . The goal of the project was to implement a radiation monitoring system that provides radiation data accessible to the public. The monitoring system consisted of usage of a radiation detector integrated with near real-time data collection and visualization. The monitoring systems were installed at five different locations and background radiation measurements were taken. The developed monitoring system demonstrated that citizen-based monitoring system could provide accessible radiation data to the general public and relevant to the area where they live. (author)

  8. ACP Facility Safety Surveillance System Installation

    International Nuclear Information System (INIS)

    You, Gil Sung; Kook, D. H.; Choung, W. M.; Ku, J. H.; Cho, I. J.; You, G. S.; Kwon, K. C.; Lee, W. K.; Lee, E. P.

    2006-10-01

    The Advanced spent fuel Conditioning Process is under development for effective management of spent fuel by converting UO 2 into U-metal. For demonstration of this process, α-γ type new hotcell was built in the IMEF basement. All facilities which treat radioactive materials must manage CCTV system which is under control of Health Physics department. Three main points (including hotcell rear door area) have each camera, but operators who are in charge of facility management need to check the safety of the facility immediately through the network in his office. This needs introduce additional network cameras installation and this new surveillance system is expected to update the whole safety control ability with existing system

  9. Development of radiation safety monitoring system at gamma greenhouse gamma facility

    International Nuclear Information System (INIS)

    Hairul Nizam Idris; Azimawati Ahmad, Ahmad Zaki Hussain; Ahmad Fairuz Mohd Nasir

    2009-01-01

    This paper is discussing about installation of radiation safety monitoring system at Gamma Greenhouse Gamma facility, Agrotechnology and Bioscience Division (BAB). This facility actually is an outdoor type irradiation facility, which first in Nuclear Malaysia and the only one in Malaysia. Source Cs-137 (801 Curie) was use as radiation source and it located at the centre of 30 metres diameter size of open irradiation area. The radiation measurement and monitoring system to be equipped in this facility were required the proper equipment and devices, specially purpose for application at outside of building. Research review, literature study and discussion with the equipment manufacturers was being carried out, in effort to identify the best system should be developed. Factors such as tropical climate, environment surrounding and security were considered during selecting the proper system. Since this facility involving with panoramic radiation type, several critical and strategic locations have been fixed with radiation detectors, up to the distance at 200 meter from the radiation source. Apart from that, this developed system also was built for capable to provide the online real-time reading (using internet). In general, it can be summarized that the radiation safety monitoring system for outdoor type irradiation facility was found much different and complex compared to the system for indoor type facility. Keyword: radiation monitoring, radiation safety, Gamma Greenhouse, outdoor irradiation facility, panoramic radiation. (Author)

  10. Environmental Baseline Survey for Installation of Five New Hydrogeologic Groundwater Monitoring Wells

    Energy Technology Data Exchange (ETDEWEB)

    Catechis, Christopher S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    This Phase I Environmental Baseline Survey (EBS) provides the findings of a survey and assessment for termination of an existing easement granted to the Department of Energy (DOE) for the installation of 5 new hydrogeologic groundwater monitoring wells located on KAFB, New Mexico. The purpose of this EBS is to: Document the nature, magnitude, and extent of any environmental contamination of the property. Identify potential environmental contamination liabilities associated with the property. Develop sufficient information to assess the health and safety risks. Ensure adequate protection for human health and the environment related to a specific property. Determine possible effects of contamination on property valuation, and serve as the basis for notice of environmental condition for applicable federal or local real property disclosure requirements.

  11. Implementation of an Automatic System for the Monitoring of Start-up and Operating Regimes of the Cooling Water Installations of a Hydro Generator

    Directory of Open Access Journals (Sweden)

    Ioan Pădureanu

    2015-07-01

    Full Text Available The safe operation of a hydro generator depends on its thermal regime, the basic conditions being that the temperature in the stator winding fall within the limits of the insulation class. As the losses in copper depend on the square current in the stator winding, it is necessary that the cooling water debit should be adapted to the values of these losses, so that the winding temperature falls within the range of the values prescribed in the specifications. This paper presents an efficient solution of commanding and monitoring the water cooling installations of two high-power hydro generators.

  12. Low-voltage electrical installations in medical buildings - clinical centres and hospitals

    Directory of Open Access Journals (Sweden)

    Simić Ninoslav

    2015-01-01

    Full Text Available This paper presents the observations collected during the testing of electrical installations in medical buildings. The details of the power supply, wiring systems and the implemented systems of protection against electric shocks are described. The causes of some faults during the exploitation of the facilities are presented through practical examples, and the specific problem caused by water leaking through the insulation of electrical installations is explained in detail. It is pointed out how important maintenance, monitoring and application of the latest standards in this area are, as well as adequate training of professional staff.

  13. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  14. Nuclear energy - Radioprotection - Procedure for radiation protection monitoring in nuclear installations for external exposure to weakly penetrating radiation, especially to beta radiation

    International Nuclear Information System (INIS)

    2002-01-01

    This International Standard specifies a procedure for radiation protection monitoring in nuclear installations for external exposure to weakly penetrating radiation, especially to beta radiation and describes the procedure in radiation protection monitoring for external exposure to weakly penetrating radiation in nuclear installations. This radiation comprises β - radiation, β + radiation and conversion electron radiation as well as photon radiation with energies below 15 keV. This International Standard describes the procedure in radiation protection planning and monitoring as well as the measurement and analysis to be applied. It applies to regular nuclear power plant operation including maintenance, waste handling and decommissioning. The recommendations of this International Standard may also be transferred to other nuclear fields including reprocessing, if the area-specific issues are considered. This International Standard may also be applied to radiation protection at accelerator facilities and in nuclear medicine, biology and research facilities

  15. The Design Fabrication Installation & Evaluation of the Balance Probe Monitor for Large Centrifuges at a National Laboratory Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, Jonathan Michael [Univ. of Texas, Austin, TX (United States)

    2016-11-01

    Balance Probe Monitors were designed, fabricated, installed, and evaluated at Sandia National Laboratories (SNL) for the 22,600 g kg (50,000 g lb) direct drive electromotor driven large centrifuges. These centrifuges provide a high onset/decay rate g environment. The Balance Probe Monitor is physically located near a centrifuge’s Capacitance Probe, a crucial sensor for the centrifuge’s sustainability. The Balance Probe Monitor will validate operability of the centrifuge. Most importantly, it is used for triggering a kill switch under the condition that the centrifuge displacement value exceeds allowed tolerances. During operational conditions, the Capacitance Probe continuously detects the structural displacement of the centrifuge and an adjoining AccuMeasure 9000 translates this displacement into an output voltage.

  16. Final report on the waste area grouping perimeter groundwater quality monitoring well installation program at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Greene, J.A.

    1991-06-01

    A groundwater quality monitoring well installation program was conducted at Oak Ridge National Laboratory (ORNL) to meet the requirements of environmental regulations, including the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A total of 173 wells were installed and developed at 11 different waste area groupings (WAGs) between June 1986 and November 1990. A location map of the wells is included

  17. Installation of beam screens in LHC arc cryomagnets

    CERN Document Server

    Cruikshank, P; Schneider, G; Veness, R J M

    1999-01-01

    Beam screens will be installed in the cold bores of the LHC arc cryodipoles and Short Straight Sections (SSS). This note describes the constraints on the beam screen installation imposed by the beam vacuum interconnects and Beam Position Monitors (BPM), and explains the installation scenario which has been adopted.

  18. Landslide monitoring and early warning systems in Lower Austria - current situation and new developments

    Science.gov (United States)

    Thiebes, Benni; Glade, Thomas; Schweigl, Joachim; Jäger, Stefan; Canli, Ekrem

    2014-05-01

    Landslides represent significant hazards in the mountainous areas of Austria. The Regional Geological Surveys are responsible to inform and protect the population, and to mitigate damage to infrastructure. Efforts of the Regional Geological Survey of Lower Austria include detailed site investigations, the planning and installation of protective structures (e.g. rock fall nets) as well as preventive measures such as regional scale landslide susceptibility assessments. For potentially endangered areas, where protection works are not feasible or would simply be too costly, monitoring systems have been installed. However, these systems are dominantly not automatic and require regular field visits to take measurements. Therefore, it is difficult to establish any relation between initiating and controlling factors, thus to fully understand the underlying process mechanism which is essential for any early warning system. Consequently, the implementation of new state-of-the-art monitoring and early warning systems has been started. In this presentation, the design of four landslide monitoring and early warning systems is introduced. The investigated landslide process types include a deep-seated landslide, a rock fall site, a complex earth flow, and a debris flow catchment. The monitoring equipment was chosen depending on the landslide processes and their activity. It aims to allow for a detailed investigation of process mechanisms in relation to its triggers and for reliable prediction of future landslide activities. The deep-seated landslide will be investigated by manual and automatic inclinometers to get detailed insights into subsurface displacements. In addition, TDR sensors and a weather station will be employed to get a better understanding on the influence of rainfall on sub-surface hydrology. For the rockfall site, a wireless sensor network will be installed to get real-time information on acceleration and inclination of potentially unstable blocks. The movement

  19. 40 CFR 265.192 - Design and installation of new tank systems or components.

    Science.gov (United States)

    2010-07-01

    ... Submerged Liquid Storage Systems,” and the American Petroleum Institute (API) Publication 1632, “Cathodic... stress due to settlement, vibration, expansion or contraction. Note: The piping system installation procedures described in American Petroleum Institute (API) Publication 1615 (November 1979), “Installation of...

  20. Fiscal year 1996 well installation program summary, Y-12 Plant Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-04-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1996 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two groundwater monitoring wells were installed during the FY 1996 drilling program. One of the groundwater monitoring wells was installed in the Lake Reality area and was of polyvinyl chloride screened construction. The other well, installed near the Ash Disposal Basin, was of stainless steel construction

  1. [Requirements for the successful installation of an data management system].

    Science.gov (United States)

    Benson, M; Junger, A; Quinzio, L; Hempelmann, G

    2002-08-01

    Due to increasing requirements on medical documentation, especially with reference to the German Social Law binding towards quality management and introducing a new billing system (DRGs), an increasing number of departments consider to implement a patient data management system (PDMS). The installation should be professionally planned as a project in order to insure and complete a successful installation. The following aspects are essential: composition of the project group, definition of goals, finance, networking, space considerations, hardware, software, configuration, education and support. Project and finance planning must be prepared before beginning the project and the project process must be constantly evaluated. In selecting the software, certain characteristics should be considered: use of standards, configurability, intercommunicability and modularity. Our experience has taught us that vaguely defined goals, insufficient project planning and the existing management culture are responsible for the failure of PDMS installations. The software used tends to play a less important role.

  2. Continuous mercury monitors conditioning/conversion systems : what we have learned

    Energy Technology Data Exchange (ETDEWEB)

    Laudal, D.L.; Dunham, G.E.; Thompson, J.S. [North Dakota Univ., Grand Forks, ND (United States). Energy and Environmental Research Center

    2006-07-01

    The challenges of continuous mercury monitoring (CMM) in flue gas were discussed with reference to conditioning/conversion systems where a sample of gas of an unknown composition is conditioned to elemental mercury. Flue gas composition varies greatly depending on coal type and plant configuration. The widely used wet-chemistry systems remove interfering gas constituents by bubbling the sample gas through reactive solutions. Some concerns with the wet systems are the amount of chemicals used and the volume of the waste generated; capture of CO{sub 2} which affects the sample volume; mercury hang-up; condensation of flue gas constituents; and, potential for unidentified chemical reactions. The advantages of dry systems were discussed, such as the ability to convert all of the mercury present in the flue gas to elemental mercury. Some of the main concerns with dry systems are that some systems will require a correction for moisture, which means installing a moisture monitor. Dry systems can also be prone to mercury hang-up and calibration of some of the dilution systems remains a concern. The systems can also be susceptible a significant decrease in catalyst life. figs.

  3. James A. FitzPatrick Nuclear Power Plant recirculation pumps vibration system installation and performance since July 7, 1990

    International Nuclear Information System (INIS)

    Lefter, J.

    1992-01-01

    James A. FitzPatrick recirculation pumps are vertical units consisting of General Electric 5,300 hp variable speed motors driving Byron Jackson Pumps. Speed range is from 400 rpm at 20% reactor power to 1,480 rpm at 100% power. Full speed pump output is 42,500 gpm at 530 ft. head. This paper describes the vibration monitoring system. The design of this vibration monitoring system took about five months and was installed during plant refueling outage between February and May 1990. The objectives of this project were as follows: (1) document and assess the mechanical condition of each RRP during plant startup normal operation and shutdown; (2) identify any areas of operation that might be harmful to the unit; (3) perform impact testing of the proximity probe brackets to determine if any bracket resonances existed in the 0 to 20 times operating speed region (0 to 20X); (4) define and recommend Acceptance Regions in the TDM system

  4. Permanent monitoring of containment integrity: the sexten system

    International Nuclear Information System (INIS)

    Germain, J.L.; Janneteau, E.

    1993-01-01

    Reactor containment integrity is of prime importance to the safety of PWR units. It is checked by means of tests performed at high pressure during the containment building pressure tests. These periodical tests are supplemented in France by permanent monitoring using the SEXTEN system. First feasibility tests for this system were carried out in 1980. The encouraging results obtained led to the development of a prototype, followed by an industrial system which has since been installed in all French PWR units. This system measures the containment leak rate, with corrections for the compressed air intakes used by the air-operated valves. Leaktightness is expressed in terms of the leak rate for a 60 mbar overpressure. If the leak rate exceeds a fixed limit value, leak detection operations are initiated, using SEXTEN. A new version of the system, known as SEXTEN 2 is being developed. (authors). 2 figs

  5. Radiation monitoring systems and methodologies for radiological impact assessment

    International Nuclear Information System (INIS)

    Chaudhury, Probal

    2016-01-01

    Radioactive sources of various strengths are used in large number of applications in industry, healthcare, agriculture and research. Though all the sources are transported and used under regulatory control, there is always a possibility of some of the sources getting into the hands of committed antisocial non state actors. In addition to this, there is a possible threat of radioactive material being illegally brought into a country. These gives rise to an increase in the global radiological threat and security experts world over are concerned about the possibility of malicious use of radiation in the public domain. Radiation detection systems are installed at various entry and exit ports of some of the countries to detect illicit trafficking of radioactive materials. IAEA has recommended that all States should have a national response plan for nuclear security events to provide for an appropriate and coordinated response. Considering the requirement of radiological emergency preparedness, various radiation monitoring systems and methodologies have been developed. A few aerial radiation monitoring systems developed at Bhabha Atomic Research Centre (BARC) for radiological impact assessment are described here

  6. An integrated system for pipeline condition monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Strong, Andrew P.; Lees, Gareth; Hartog, Arthur; Twohig, Richard; Kader, Kamal; Hilton, Graeme; Mullens, Stephen; Khlybov, Artem [Schlumberger, Southampton (United Kingdom); Sanderson, Norman [BP Exploration, Sunbury (United Kingdom)

    2009-07-01

    monitoring in a wide range of other applications such as: long sub sea flow lines; offshore riser systems; settlement in tank farms; facilities perimeter security. An important element of this system is a bespoke direct-bury optical sensor cable, designed to allow distributed strain measurement and hence enable monitoring of ground movement, whilst withstanding the rigors of the pipeline environment. The system can also be configured for detection of third-party interference and leaks with the majority of existing buried cables. In this paper, we outline the optical sensing methods employed in the system, and the results of the extensive field trials performed to fully evaluate and prove the system for use on long hydrocarbon transmission pipelines. Specifically, we will describe the detection of small gas releases, simulated ground movement and detection and recognition of a number of different types of third party interventions at the full 100 km target range. Finally, the tracking of a pig during pigging operations is demonstrated on a pilot installation. (author)

  7. Decree of the 23-rd of June 2015 related to installations implementing radioactive materials, radioactive wastes or solid residues of uranium, thorium or radium ore submitted to authorization according to entry 1716, to entry 1735 and to entry 2797 of the nomenclature of classified installations

    International Nuclear Information System (INIS)

    Blanc, P.

    2015-01-01

    This decree defines general prescriptions applicable to installations implementing radioactive materials, to installations used as depository, warehousing or storage of radioactive materials under the form of solid residues of radium, thorium or uranium ore, as well as some processing products, and to installations used for the management of radioactive wastes in an industrial or commercial facility. The decree contains general arrangements about authorisation request, financial guarantees and conditions of exploitation. It addresses measures and arrangements for the management of installations, for the management of radioactive materials and wastes, for the prevention of atmospheric pollution, for the protection of water resources and aquatic media. It also contains general rules for waste management, specific rules for radioactive waste management. It addresses measures and arrangements regarding the prevention of technological risks, the monitoring of installations and of their impact. An appendix addresses the various aspects of the quality management system: organisation and personnel, risk identification and assessment, process management and exploitation monitoring, management of modifications, planning of emergency situation, return on experience, performance monitoring. A last appendix addresses the monitoring of underground waters

  8. A distributed monitoring system for photovoltaic arrays based on a two-level wireless sensor network

    Science.gov (United States)

    Su, F. P.; Chen, Z. C.; Zhou, H. F.; Wu, L. J.; Lin, P. J.; Cheng, S. Y.; Li, Y. F.

    2017-11-01

    In this paper, a distributed on-line monitoring system based on a two-level wireless sensor network (WSN) is proposed for real time status monitoring of photovoltaic (PV) arrays to support the fine management and maintenance of PV power plants. The system includes the sensing nodes installed on PV modules (PVM), sensing and routing nodes installed on combiner boxes of PV sub-arrays (PVA), a sink node and a data management centre (DMC) running on a host computer. The first level WSN is implemented by the low-cost wireless transceiver nRF24L01, and it is used to achieve single hop communication between the PVM nodes and their corresponding PVA nodes. The second level WSN is realized by the CC2530 based ZigBee network for multi-hop communication among PVA nodes and the sink node. The PVM nodes are used to monitor the PVM working voltage and backplane temperature, and they send the acquired data to their PVA node via the nRF24L01 based first level WSN. The PVA nodes are used to monitor the array voltage, PV string current and environment irradiance, and they send the acquired and received data to the DMC via the ZigBee based second level WSN. The DMC is designed using the MATLAB GUIDE and MySQL database. Laboratory experiment results show that the system can effectively acquire, display, store and manage the operating and environment parameters of PVA in real time.

  9. Groundwater quality monitoring well installation for Upper Waste Areas Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Lee, T.A.

    1994-09-01

    This report documents the drilling and installation of seven groundwater quality monitoring (GQM) wells on the perimeter of Upper Waste Area Grouping (WAG) 2. Upper WAG 2 is composed of portions of White Oak Creek (WOC), Melton Branch, two of Melton Branch's tributaries, and the floodplains surrounding these water bodies. The WOC section of the subject site begins at the confluence of WOC and Melton Branch and extends 0.62 mile upstream to the 7,500 bridge. The Melton Branch portion of the site also begins at the confluence of WOC and Melton Branch and extends eastward 0.88 mile upstream. The wells at Upper WAG 2 were drilled and developed between December 1989 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at Upper WAG-2. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  10. Artificial intelligence system for the monitoring of natural gas production systems; Intelligente Ueberwachung von Erdgasfoerderanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Tschaetsch, H.U.

    2001-02-01

    The article explains a novel, artificial intelligence-based system called HISS (Human Interface Supervision System) which has been installed as a prototype for the monitoring of a natural gas production site at Thoense near Hannover/Germany. The system is capable to perform audio-visual and smelling functions, analogous to the human sensory perception. (orig./CB) [German] Die Aufrechterhaltung eines einwandfreien Betriebszustandes von technischen Anlagen durch staendige Kontrollen und regelmaessige Wartungsarbeiten ist haeufig eine aufwendige und kostspielige Angelegenheit. Gleichwohl ist sie - sowohl was die Frage der Sicherheit als auch des Umweltschutzes anbelangt - unentbehrlich. Die Erdgasfoerderanlage Thoense bei Hannover wird von einem intelligenten Ueberwachungssystem, HISS - Human Interface Supervision System, kontrolliert, das die menschlichen Eigenschaften sehen, hoeren und riechen beherrscht. (orig.)

  11. Final Technical Report: Development of Post-Installation Monitoring Capabilities

    Energy Technology Data Exchange (ETDEWEB)

    Polagye, Brian [University of Washington

    2014-03-31

    of the subsea base support structure. In support of these plans, the project team developed and field tested a strobe-illuminated stereooptical camera system suitable for studying near-turbine interactions with marine animals. The camera system underwent short-term field testing at the proposed turbine deployment site and a multi-month endurance test in shallower water to evaluate the effectiveness of biofouling mitigation measures for the optical ports on camera and strobe pressure housings. These tests demonstrated that the camera system is likely to meet the objectives of the near-turbine monitoring plan and operate, without maintenance, for periods of at least three months. The project team also advanced monitoring capabilities related to passive acoustic monitoring of marine mammals and monitoring of tidal currents. These capabilities will be integrated in a recoverable monitoring package that has a single interface point with the OpenHydro turbines, connects to shore power and data via a wet-mate connector, and can be recovered to the surface for maintenance and reconfiguration independent of the turbine. A logical next step would be to integrate these instruments within the package, such that one instrument can trigger the operation of another.

  12. The use of energy management and control systems to monitor the energy performance of commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    Heinemeier, Kristin Elizabeth [Univ. of California, Berkeley, CA (United States). Dept. of Architecture

    1994-12-01

    Monitored data play a very important part in the implementation and evaluation of energy conservation technologies and programs. However, these data can be expensive to collect, so there is a need for lower-cost alternatives. In many situations, using the computerized Energy Management and Control Systems (EMCSs)--already installed in many buildings--to collect these commercial building performance data has advantages over more conventional methods. This method provides data without installing incremental hardware, and the large amounts of available operational data can be a very rich resource for understanding building performance. This dissertation addresses several of these issues. One specific objective is to describe a monitoring-project planning process that includes definition of objectives, constraints, resources and approaches for the monitoring. The choice of tools is an important part of this process. The dissertation goes on to demonstrate, through eight case studies, that EMCS monitoring is possible, and to identify and categorize the problems and issues that can be encountered. These issues lead to the creation, use, and testing of a set of methods for evaluation of EMCS monitoring, in the form of guidelines. Finally, EMCS monitoring is demonstrated and compared with conventional monitoring more methodically in a detailed case study.

  13. Process computers automate CERN power supply installations

    International Nuclear Information System (INIS)

    Ullrich, H.; Martin, A.

    1974-01-01

    Higher standards of performance and reliability in the power plants of large particle accelerators necessitate increasing use of automation. The CERN (European Nuclear Research Centre) in Geneva started to employ process computers for plant automation at an early stage in its history. The great complexity and extent of the plants for high-energy physics first led to the setting-up of decentralized automatic systems which are now being increasingly combined into one interconnected automation system. One of these automatic systems controls and monitors the extensive power supply installations for the main ring magnets in the experimental zones. (orig.) [de

  14. Development of personal dose monitoring system using wireless data transmission device

    International Nuclear Information System (INIS)

    Inui, Daisuke; Nakashima, Sadao

    2008-01-01

    Radiation workers working in radiation controlled area in nuclear power plants etc., are required to carry a dosimeters by regulation law. The workers are controlled daily on personal exposure dose by reading out the exposure dose information of the dosimeters with an area access control gate installed at the entrance of the radiation controlled area. This type of personal dose monitoring system has a problem that each worker can get his personal dose data only at the entrance of the radiation controlled area several times a day. We developed a system to get the real-time acquisition of personal dose data especially for workers working in a high dose area. This system is generally composed of a dosimeter with a wireless attachment, relay station, and monitor. Some relay stations set in main work places in the radiation controlled area can collect real-time personal dose data of each dosimeter carried by workers at the work place with the relay stations, and transmit it to the monitor to get personal dose data of individual workers. A wireless communication system between dosimeters and relay stations is applied to collect efficiently all personal dose data in the work place. (author)

  15. Monitoring system including an electronic sensor platform and an interrogation transceiver

    Science.gov (United States)

    Kinzel, Robert L.; Sheets, Larry R.

    2003-09-23

    A wireless monitoring system suitable for a wide range of remote data collection applications. The system includes at least one Electronic Sensor Platform (ESP), an Interrogator Transceiver (IT) and a general purpose host computer. The ESP functions as a remote data collector from a number of digital and analog sensors located therein. The host computer provides for data logging, testing, demonstration, installation checkout, and troubleshooting of the system. The IT transmits signals from one or more ESP's to the host computer to the ESP's. The IT host computer may be powered by a common power supply, and each ESP is individually powered by a battery. This monitoring system has an extremely low power consumption which allows remote operation of the ESP for long periods; provides authenticated message traffic over a wireless network; utilizes state-of-health and tamper sensors to ensure that the ESP is secure and undamaged; has robust housing of the ESP suitable for use in radiation environments; and is low in cost. With one base station (host computer and interrogator transceiver), multiple ESP's may be controlled at a single monitoring site.

  16. IoT based Growth Monitoring System of Guava (Psidium guajava L.) Fruits

    Science.gov (United States)

    Slamet, W.; Irham, N. M.; Sutan, M. S. A.

    2018-05-01

    Growth monitoring of plant is important especially to evaluate the influence of environment or growing condition on its productivity. One way to monitor the plant growth is by measuring the radial growth (i.e., the change of circumference) of certain part of plant such as trunk, branch, and fruit. In this study we develop an internet of things (IoT) based monitoring system of radial growth of plant using a low-cost optoelectronic sensor. The system was applied to monitor radial growth of guava fruits (Psidium guajava L.). The principle of the developed sensor is based on the optoelectronic sensor which detects alternating white and black narrow bar printed on reflective tapes. Reflective tape was installed encircling the fruit. The movement of reflective tapes will follow the radial growth of the fruit so that the infrared sensor on the optoelectronic would response reflective tapes movement. This device is designed to measure object continuously and long-term monitor with minimum maintenance. The data collected by the sensors are then sent to the server and also can be monitored in real-time. Based on field test, at current stage, the developed sensor could measure the radial growth of the fruits with a maximum error 2 mm. In term of data transfer, the success rate of the developed system was 97.54%. The result indicated that the developed system can be used as an effective tool for growth monitoring of plant.

  17. Continuous fission-product monitor system at Oyster Creek. Final report

    International Nuclear Information System (INIS)

    Collins, L.L.; Chulick, E.T.

    1980-10-01

    A continuous on-line fission product monitor has been installed at the Oyster Creek Nuclear Generating Station, Forked River, New Jersey. The on-line monitor is a minicomputer-controlled high-resolution gamma-ray spectrometer system. An intrinsic Ge detector scans a collimated sample line of coolant from one of the plant's recirculation loops. The minicomputer is a Nuclear Data 6620 system. Data were accumulated for the period from April 1979 through January 1980, the end of cycle 8 for the Oyster Creek plant. Accumulated spectra, an average of three a day, were stored on magnetic disk and subsequently analyzed for fisson products, Because of difficulties in measuring absolute detector efficiency, quantitative fission product concentrations in the coolant could not be determined. Data for iodine fission products are reported as a function of time. The data indicate the existence of fuel defects in the Oyster Creek core during cycle 8

  18. Vulnerability analysis on a VPN for a remote monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Soo; Kim, Jong Soo; Park, Il Jin; Min, Kyung Sik; Choi, Young Myung [KAERI, Taejon (Korea, Republic of)

    2004-08-01

    14 Pressurized Water Reactors(PWR) in Korea use a Remote Monitoring System(RMS), which have been in Korea Since 1998. A memorandum of understanding on remote monitoring, based on enhanced cooperation on PWRs, was signed at the 10th safeguards review meeting in October 2001 between the International Atomic Energy Agency(IAEA) and Ministry Of Science and Technology(MOST). Thereafter, all PWR power plants applied for remote monitoring systems. However, the existing method is high cost (involving expensive telephone costs). So, it was eventually applied to an internet system for remote monitoring. According to the internet-based Virtual Private Network(VPN) applied to remote monitoring, the Korea Atomic Energy Research Institute(KAERI) came to an agreement with the IAEA, using a Member State Support Program(MSSP). Phase I is a lab test. Phase II is to apply it to a target power plant. Phase III is to apply it to all the power plants. This paper reports on the penetration testing of phase I. Phase I involved both domestic testing and international testing. The target of the testing consisted of a Surveillance Digital Integrated system(SDIS) server, IAEA server and TCNC(Technology Center for Nuclear Control) server. In each system, Virtual Private Network(VPN) system hardware was installed. The penetration of the three systems and the three VPNs was tested. The domestic test involved two hacking scenarios: hacking from the outside and hacking from the inside. The international test involved one scenario from the outside. The results of tests demonstrated that the VPN hardware provided a good defense against hacking. We verified that there was no invasion of the system (SDIS server and VPN; TCNC server and VPN; and IAEA server and VPN) via penetration testing.

  19. Vulnerability analysis on a VPN for a remote monitoring system

    International Nuclear Information System (INIS)

    Kim, Jung Soo; Kim, Jong Soo; Park, Il Jin; Min, Kyung Sik; Choi, Young Myung

    2004-01-01

    14 Pressurized Water Reactors(PWR) in Korea use a Remote Monitoring System(RMS), which have been in Korea Since 1998. A memorandum of understanding on remote monitoring, based on enhanced cooperation on PWRs, was signed at the 10th safeguards review meeting in October 2001 between the International Atomic Energy Agency(IAEA) and Ministry Of Science and Technology(MOST). Thereafter, all PWR power plants applied for remote monitoring systems. However, the existing method is high cost (involving expensive telephone costs). So, it was eventually applied to an internet system for remote monitoring. According to the internet-based Virtual Private Network(VPN) applied to remote monitoring, the Korea Atomic Energy Research Institute(KAERI) came to an agreement with the IAEA, using a Member State Support Program(MSSP). Phase I is a lab test. Phase II is to apply it to a target power plant. Phase III is to apply it to all the power plants. This paper reports on the penetration testing of phase I. Phase I involved both domestic testing and international testing. The target of the testing consisted of a Surveillance Digital Integrated system(SDIS) server, IAEA server and TCNC(Technology Center for Nuclear Control) server. In each system, Virtual Private Network(VPN) system hardware was installed. The penetration of the three systems and the three VPNs was tested. The domestic test involved two hacking scenarios: hacking from the outside and hacking from the inside. The international test involved one scenario from the outside. The results of tests demonstrated that the VPN hardware provided a good defense against hacking. We verified that there was no invasion of the system (SDIS server and VPN; TCNC server and VPN; and IAEA server and VPN) via penetration testing

  20. Condition monitoring of rotor blades of modern wind power systems; Ueberwachung mit Hertz. Condition Monitoring von Rotorblaettern moderner Windenergieanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Fecht, Nikolaus

    2010-06-15

    With seven wind turbines, the Austrian wind farm ''Sternwald'' is the biggest wind farm in Upper Austria. It is the only wind farm in a forest, and all turbines are therefore equipped with automatic fire fighting equipment. The mountain range on which the wind farm is located is about 1000 m high, with strong wind and much ice and snow in the winter season. For this reason, the owner decided to instal a condition monitoring system with ice detectors. The piezoelectric sensors are mounted directly on the rotor blades as measurements on the nacelle will always be incorrect. Installation on the rotor blades, on the other hand, makes high demands on the fastenings and sensors as the velocity of the blade tips may be up to 250 km per hour. (orig.)

  1. Federal Emergency Management Information System (FEMIS) Installation Guide for FEMIS Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, Robert A.(BATTELLE (PACIFIC NW LAB)); Carter, Richard J.(BATTELLE (PACIFIC NW LAB)); Downing, Timothy R.(BATTELLE (PACIFIC NW LAB)); Dunkle, Julie R.(BATTELLE (PACIFIC NW LAB)); Homer, Brian J.(BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M.(BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L.(BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M.(BATTELLE (PACIFIC NW LAB)); Loveall, Robert M.(BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Wood, Blanche M.(BATTELLE (PACIFIC NW LAB))

    2001-12-01

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS Installation Guide provides instructions for installing and configuring the FEMIS software package.

  2. Wire system aging assessment and condition monitoring (WASCO)

    International Nuclear Information System (INIS)

    Fantoni, P.F.; Nordlund, A.

    2006-04-01

    Nuclear facilities rely on electrical wire systems to perform a variety of functions for successful operation. Many of these functions directly support the safe operation of the facility; therefore, the continued reliability of wire systems, even as they age, is critical. Condition Monitoring (CM) of installed wire systems is an important part of any aging program, both during the first 40 years of the qualified life and even more in anticipation of the license renewal for a nuclear power plant. This report describes a method for wire system condition monitoring, developed at the Halden Reactor Project, which is based on Frequency Domain Reflectometry. This method resulted in the development of a system called LIRA (LIne Resonance Analysis), which can be used on-line to detect any local or global changes in the cable electrical parameters as a consequence of insulation faults or degradation. LIRA is composed of a signal generator, a signal analyser and a simulator that can be used to simulate several failure/degradation scenarios and assess the accuracy and sensitivity of the LIRA system. Chapter 5 of this report describes an complementary approach based on positron measurement techniques, used widely in defect physics due to the high sensitivity to micro defects, in particular open volume defects. This report describes in details these methodologies, the results of field experiments and the proposed future work. (au)

  3. Wire system aging assessment and condition monitoring (WASCO)

    Energy Technology Data Exchange (ETDEWEB)

    Fantoni, P.F. [Institutt for energiteknikk (Norway); Nordlund, A. [Chalmers Univ. of Technology (Sweden)

    2006-04-15

    Nuclear facilities rely on electrical wire systems to perform a variety of functions for successful operation. Many of these functions directly support the safe operation of the facility; therefore, the continued reliability of wire systems, even as they age, is critical. Condition Monitoring (CM) of installed wire systems is an important part of any aging program, both during the first 40 years of the qualified life and even more in anticipation of the license renewal for a nuclear power plant. This report describes a method for wire system condition monitoring, developed at the Halden Reactor Project, which is based on Frequency Domain Reflectometry. This method resulted in the development of a system called LIRA (LIne Resonance Analysis), which can be used on-line to detect any local or global changes in the cable electrical parameters as a consequence of insulation faults or degradation. LIRA is composed of a signal generator, a signal analyser and a simulator that can be used to simulate several failure/degradation scenarios and assess the accuracy and sensitivity of the LIRA system. Chapter 5 of this report describes an complementary approach based on positron measurement techniques, used widely in defect physics due to the high sensitivity to micro defects, in particular open volume defects. This report describes in details these methodologies, the results of field experiments and the proposed future work. (au)

  4. Installation of a permeable reactive barrier at the mining complex facility in Los Gigantes - Cordoba : Monitoring plan of surface and underground water

    International Nuclear Information System (INIS)

    Grande Cobian, Juan D.; Sanchez Proano, Paula; Cicerone, Daniel S.

    2009-01-01

    The Argentine National Atomic Energy Commission declares under its Environmental policy the commitment to restore those sites where activities concerning Uranium mining were developed. It makes it beyond the scope of the Project of Environmental Restitution of the Uranium Mining (PRAMU from its Spanish abbreviation). The Chemistry of Water and Soil Division at the Environmental Chemistry and Energy Generation Department belonging to the Chemistry Management Office assist the PRAMU on the installation of an hydroxyapatite permeable reactive barrier (PRB) inside the Mining Complex facility placed at Los Gigantes in the Argentine province of Cordoba (in advance named the site). Among the preliminary assessment activities that are being carried out before the installation of the PRB, it has been prepared a monitoring program of surface water and groundwater useful to develop an environmental baseline suitable for the efficiency assessment of the corrective action to be applied. An exploratory campaign was conducted in the site with the aim of establishing a monitoring net of meteorological and hydrological, as well as physical, chemical and biological parameters in matrixes of sediments, water and suspended particulate matter collected on a regular time basis from its surface water and groundwater bodies. The processed results turn into useful environmental information to: a) determine the status of the environmental baseline of the site, b) establish a water quality index (WQI) to manage the natural resource quality according to a rational basis, c) plan experiments related to the design process of a biogenic hydroxyapatite PRB and d) apply chemometric and mechanistic models to forecast the contaminants mobilization through different scenarios and improve the engineering design of the PRB. Once achieved the hydrogeological characterisation of the site and taking into account the originality of the system the following results have been reached: 1) The boundaries of

  5. Hydrological information system based on on-line monitoring--from strategy to implementation in the Brantas River Basin, East Java, Indonesia.

    Science.gov (United States)

    Marini, G W; Wellguni, H

    2003-01-01

    The worsening environmental situation of the Brantas River, East Java, is addressed by a comprehensive basin management strategy which relies on accurate water quantity and quality data retrieved from a newly installed online monitoring network. Integrated into a Hydrological Information System, the continuously measured indicative parameters allow early warning, control and polluter identification. Additionally, long-term analyses have been initiated for improving modelling applications like flood forecasting, water resource management and pollutant propagation. Preliminary results illustrate the efficiency of the installed system.

  6. One-Year Monitoring PV Power Plant Installed on Rooftop of Mineirão Fifa World Cup/Olympics Football Stadium

    Directory of Open Access Journals (Sweden)

    Luís G. Monteiro

    2017-02-01

    Full Text Available This paper presents results of one-year monitoring of AC side electrical parameters and the characterization of local solar radiation at the biggest rooftop PV Power Plant, with an installed capacity of 1.42 MWp, mounted at Mineirão Football Stadium in Brazil. This stadium is one of the sport facilities that hosted 2014 FIFA World Cup and Rio 2016 Summer Olympics Games in the country. Results showed how it is important to study and characterize the solar resource in the region of interest, based on historic data, to provide the understanding of solar radiation and thus project PV power plants with better performance. Furthermore, AC electrical data show the behavior of active, reactive and apparent powers and the influence of the PV system on the power factor at the local grid utility connection point. Finally, PV power plant performance data (as annual final yield, performance ratio and capacity factor are also presented and compared with data from PVsyst software simulations. The results over the monitoring period were good considering the specificities of the stadium

  7. Installation, testing and first results of TEXTOR's new ICRH system

    International Nuclear Information System (INIS)

    Durodie, F.; Delvigne, T.; Descamps, P.; Koch, R.; Ongena, J.; Vandenplas, P.E.; Van Nieuwenhove, R.; Van Oost, G.; Weynants, R.R.; Shen, X.M.; Ecole Royale Militaire, Brussels; Messiaen, A.M.; Ecole Royale Militaire, Brussels; Huetteman, P.; Kohlhaas, W.; Stickelman, C.; Cosler, A.

    1989-01-01

    The new ICRH system for TEXTOR, presented at the previous SOFT conference, has been tested and installed during spring and summer of 1987. Pulses of up to 2.8 MW have been achieved representing a power density at the antenna of about 3.1 MW/m 2 and over 90% of the installed RF power. Taking into account the already achieved volttages in the system one could extrapolate that a power density of 10 MW/m 2 with an transmission efficiency well over 90% would be technically feasible. First results, such as the interesting property that, in contrast with other experiments, the two antennae in each pair operate with zero and with π phase difference with nearly the same coupling efficiency, are discussed. The testing and conditioning procedures are described. RF-leak problems encounterd at the behinning of the experimental phase are discussed. Antenna and transmission line diagnostics as well as related tuning procedures are also described. During the installation of the neutral beam injectors, from beginning of April to about end of August 1988, several modifications to the whole of the ICRH system are being implemented. (author). 5 refs.; 6 figs.; 1 tab

  8. Development of a wireless monitoring system for fracture-critical bridges

    Science.gov (United States)

    Fasl, Jeremiah; Samaras, Vasilis; Reichenbach, Matthew; Helwig, Todd; Wood, Sharon L.; Potter, David; Lindenberg, Richard; Frank, Karl

    2011-04-01

    This paper provides a summary of ongoing research sponsored by the National Institute of Standards and Technology (NIST) that seeks to improve inspection practices for steel bridges by providing the technology and methodology for real-time monitoring. In order to reduce the time and cost of installing a monitoring system, the research team elected to use wireless communications within the sensor network. The investigation considered both IEEE 802.11 and IEEE 802.15.4 communications protocols and identified the latter as more practical for bridge monitoring applications. Studies were conducted to investigate possible improvements in the network performance using high-gain antennas. Results from experiments conducted outside and on bridges with different antennas are presented in this paper. Although some benefits were observed using high-gain antennas, the inconsistent performance and higher cost relative to the current stock, omni-directional antennas does not justify their use.

  9. Trigger Menu-aware Monitoring for the ATLAS experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00441925; The ATLAS collaboration

    2017-01-01

    Changes in the trigger menu, the online algorithmic event-selection of the ATLAS experiment at the LHC, are followed by adjustments to the ATLAS trigger monitoring systems. During Run 1, and so far in Run 2, ATLAS has deployed monitoring updates with the installation of new software releases at Tier-0, the first level of the ATLAS computing grid. Having to wait for a new software release to be installed at Tier-0, in order to update ATLAS offline trigger monitoring configurations, results in a lag with respect to the modification of the trigger menu. We present the design and implementation of a `trigger menu-aware' monitoring system that aims to simplify the ATLAS operational workflows by allowing monitoring configuration changes to be made at the Tier-0 site by utilising an Oracle SQL database.

  10. 40 CFR 60.264 - Emission monitoring.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Emission monitoring. 60.264 Section 60... Facilities § 60.264 Emission monitoring. (a) The owner or operator subject to the provisions of this subpart shall install, calibrate, maintain and operate a continuous monitoring system for measurement of the...

  11. Control and monitoring systems for electron beam flue gas treatment technology

    International Nuclear Information System (INIS)

    Chmielewski, A.G.; Licki, J.; Mazurekc, J.; Nelskic, L.; Sobolewskic, L.

    2011-01-01

    The reliable and accurate measurements of gas parameters in essential points of industrial plant are necessary for its proper operation and control. Natural flue gases there are only at the inlet. At other points of plant gas parameters are strongly modified by process control system. The principal role of process monitoring system is to provide the Computer System for Monitoring and Control with continuous recording of process parameters. The main goal of control system is to obtain the optimal SO 2 and NO x removal efficiencies by control of amount of spray water at the spray cooler, amount of NH 3 injection to flue gas and adjustment of electron beam current. The structure of the process control system is based on algorithms describing functional dependence of SO 2 and NO x removal efficiencies. The best available techniques should be applied for measurements of flue gases parameters at essential points of installation and for digital control system to assist plant operators in the analysis and optimization of plant operation, including integrated emission control. (author)

  12. Control and monitoring systems for electron beam flue gas treatment technology

    Energy Technology Data Exchange (ETDEWEB)

    Chmielewski, A. G. [Institute of Nuclear Chemistry and Technology, Warsaw (Poland); Licki, J. [Institute of Atomic Energy, Otwock-Świerk (Poland); Mazurekc, J.; Nelskic, L.; Sobolewskic, L. [Dolna Odra Group, Pomorzany Power Plant, Szczecin (Poland)

    2011-07-01

    The reliable and accurate measurements of gas parameters in essential points of industrial plant are necessary for its proper operation and control. Natural flue gases there are only at the inlet. At other points of plant gas parameters are strongly modified by process control system. The principal role of process monitoring system is to provide the Computer System for Monitoring and Control with continuous recording of process parameters. The main goal of control system is to obtain the optimal SO{sub 2} and NO{sub x} removal efficiencies by control of amount of spray water at the spray cooler, amount of NH{sub 3} injection to flue gas and adjustment of electron beam current. The structure of the process control system is based on algorithms describing functional dependence of SO{sub 2} and NO{sub x} removal efficiencies. The best available techniques should be applied for measurements of flue gases parameters at essential points of installation and for digital control system to assist plant operators in the analysis and optimization of plant operation, including integrated emission control. (author)

  13. Volcanic Hazards in Site Evaluation for Nuclear Installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-10-15

    This publication provides comprehensive and updated guidance for site evaluation in relation to volcanic hazards. It includes recommendations on assessing the volcanic hazards at a nuclear installation site, in order to identify and characterize, in a comprehensive manner, all potentially hazardous phenomena that may be associated with future volcanic events. It describes how some of these volcanic phenomena may affect the acceptability of the selected site, resulting in exclusion of a site or determining the corresponding design basis parameters for the installation. This Safety Guide is applicable to both existing and new sites, and a graded approach is recommended to cater for all types of nuclear installations. Contents: 1. Introduction; 2. Overview of volcanic hazard assessment; 3. General recommendations; 4. Necessary information and investigations (database); 5. Screening of volcanic hazards; 6. Site specific volcanic hazard assessment; 7. Nuclear installations other than nuclear power plants; 8. Monitoring and preparation for response; 9. Management system for volcanic hazard assessment; Annex I: Volcanic hazard scenarios; Annex II: Worldwide sources of information.

  14. BUILDOUT AND UPGRADE OF CENTRAL EMERGENCY GENERATOR SYSTEM, GENERATOR 3 AND 4 ELECTRICAL INSTALLATION

    Energy Technology Data Exchange (ETDEWEB)

    Gary D. Seifert; G. Shawn West; Kurt S. Myers; Jim Moncur

    2006-07-01

    SECTION 01000—SUMMARY OF WORK PART 1—GENERAL 1.1 SUMMARY The work to be performed under this project consists of providing the labor, equipment, and materials to perform "Buildout and Upgrade of Central Emergency Generator System, Generator 3 and 4 Electrical Installation" for the National Aeronautics and Space Administration at the Dryden Flight Research Center (NASA/DFRC), Edwards, California 93523. All modifications to existing substations and electrical distribution systems are the responsibility of the contractor. It is the contractor’s responsibility to supply a complete and functionally operational system. The work shall be performed in accordance with these specifications and the related drawings. The work of this project is defined by the plans and specifications contained and referenced herein. This work specifically includes but is not limited to the following: Scope of Work - Installation 1. Install all electrical wiring and controls for new generators 3 and 4 to match existing electrical installation for generators 1 and 2 and in accordance with drawings. Contractor shall provide as-built details for electrical installation. 2. Install battery charger systems for new generators 3 and 4 to match existing battery charging equipment and installation for generators 1 and 2. This may require exchange of some battery charger parts already on-hand. Supply power to new battery chargers from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. 3. Install electrical wiring for fuel/lube systems for new generators 3 and 4 to match existing installation for generators 1 and 2. Supply power to lube oil heaters and fuel system (day tanks) from panel and breakers as shown on drawings. Utilize existing conduits already routed to generators 3 and 4 to field route the new wiring in the most reasonable way possible. Add any conduits necessary to

  15. 40 CFR 63.4168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ... divert the emissions away from the add-on control device to the atmosphere. (ii) Car-seal or lock-and-key valve closures. Secure any bypass line valve in the closed position with a car-seal or a lock-and-key... the monitor will indicate valve position. (iv) Automatic shutdown system. Use an automatic shutdown...

  16. A Remote Monitoring System for Greenhouse Based on the Internet of Things

    Directory of Open Access Journals (Sweden)

    Xu Zhenfeng

    2016-01-01

    Full Text Available The Internet of Things (IOT is considered as a great opportunity for the development in the information field nowadays, and has been applied widely in many fields. The IOT can be applied to monitor and control the microclimate factors of greenhouse remotely. In this paper, a wireless monitoring network is designed in the perception layer of the IOT. The nodes are developed based on the Mica2 hardware and the TinyOS software. The LPL (low power listening technology is adopted to reduce the energy consumption of the relay node which is powered by a solar panel. The ACK (Acknowledgement mechanism is used in the software to improve the quality of wireless communications. A remote monitoring terminal is developed by using Java technology. The monitoring terminal is easy to operate with good interactivity. The system has been installed in a glass greenhouse. The actual operation results show that the system is stable and reliable, which lays a good foundation for the development of remote control strategies in future.

  17. A very sensitive nonintercepting beam average velocity monitoring system for the TRIUMF 300-keV injection line

    International Nuclear Information System (INIS)

    Yin, Y.; Laxdal, R.E.; Zelenski, A.; Ostroumov, P.

    1997-01-01

    A nonintercepting beam velocity monitoring system has been installed in the 300-keV injection line of the TRIUMF cyclotron to reproduce the injection energy for beam from different ion sources and to monitor any beam energy fluctuations. By using a programmable beam signal leveling method the system can work with a beam current dynamic range of 50 dB. Using synchronous detection, the system can detect 0.5 eV peak-to-peak energy modulation of the beam, sensitivity is 1.7x10 -6 . The paper will describe the principle and beam measurement results. copyright 1997 American Institute of Physics

  18. Development and application of remote video monitoring system for combine harvester based on embedded Linux

    Science.gov (United States)

    Chen, Jin; Wang, Yifan; Wang, Xuelei; Wang, Yuehong; Hu, Rui

    2017-01-01

    Combine harvester usually works in sparsely populated areas with harsh environment. In order to achieve the remote real-time video monitoring of the working state of combine harvester. A remote video monitoring system based on ARM11 and embedded Linux is developed. The system uses USB camera for capturing working state video data of the main parts of combine harvester, including the granary, threshing drum, cab and cut table. Using JPEG image compression standard to compress video data then transferring monitoring screen to remote monitoring center over the network for long-range monitoring and management. At the beginning of this paper it describes the necessity of the design of the system. Then it introduces realization methods of hardware and software briefly. And then it describes detailedly the configuration and compilation of embedded Linux operating system and the compiling and transplanting of video server program are elaborated. At the end of the paper, we carried out equipment installation and commissioning on combine harvester and then tested the system and showed the test results. In the experiment testing, the remote video monitoring system for combine harvester can achieve 30fps with the resolution of 800x600, and the response delay in the public network is about 40ms.

  19. Installation package for a domestic solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    The installation of two prototype solar heating and hot water systems is described. The systems consists of the following subsystems: solar collector, storage, control, transport, and auxiliary energy.

  20. Plant process computer replacements - techniques to limit installation schedules and costs

    International Nuclear Information System (INIS)

    Baker, M.D.; Olson, J.L.

    1992-01-01

    Plant process computer systems, a standard fixture in all nuclear power plants, are used to monitor and display important plant process parameters. Scanning thousands of field sensors and alarming out-of-limit values, these computer systems are heavily relied on by control room operators. The original nuclear steam supply system (NSSS) vendor for the power plant often supplied the plant process computer. Designed using sixties and seventies technology, a plant's original process computer has been obsolete for some time. Driven by increased maintenance costs and new US Nuclear Regulatory Commission regulations such as NUREG-0737, Suppl. 1, many utilities have replaced their process computers with more modern computer systems. Given that computer systems are by their nature prone to rapid obsolescence, this replacement cycle will likely repeat. A process computer replacement project can be a significant capital expenditure and must be performed during a scheduled refueling outage. The object of the installation process is to install a working system on schedule. Experience gained by supervising several computer replacement installations has taught lessons that, if applied, will shorten the schedule and limit the risk of costly delays. Examples illustrating this technique are given. This paper and these examples deal only with the installation process and assume that the replacement computer system has been adequately designed, and development and factory tested

  1. Cost effective system for monitoring of fish migration with a camera

    Science.gov (United States)

    Sečnik, Matej; Brilly, Mitja; Vidmar, Andrej

    2016-04-01

    Within the European LIFE project Ljubljanica connects (LIFE10 NAT/SI/000142) we have developed a cost-effective solution for the monitoring of fish migration through the fish passes with the underwater camera. In the fish pass at Ambrožev trg and in the fish pass near the Fužine castle we installed a video camera called "Fishcam" to be able to monitor the migration of fish through the fish passes and success of its reconstruction. Live stream from fishcams installed in the fishpassesis available on our project website (http://ksh.fgg.uni-lj.si/ljubljanicaconnects/ang/12_camera). The system for the fish monitoring is made from two parts. First is the waterproof box for the computer with charger and the second part is the camera itself. We used a high sensitive Sony analogue camera. The advantage of this camera is that it has very good sensitivity in low light conditions, so it can take good quality pictures even at night with a minimum additional lighting. For the night recording we use additional IR reflector to illuminate passing fishes. The camera is connected to an 8-inch tablet PC. We decided to use a tablet PC because it is quite small, cheap, it is relatively fast and has a low power consumption. On the computer we use software which has advanced motion detection capabilities, so we can also detect the small fishes. When the fish is detected by a software, its photograph is automatically saved to local hard drive and for backup also on Google drive. The system for monitoring of fish migration has turned out to work very well. From the beginning of monitoring in June 2015 to end of the year there were more than 100.000 photographs produced. The first analysis of them was already prepared estimating fish species and their frequency in passing the fish pass.

  2. A new kind of universal smart home security safety monitoring system

    Science.gov (United States)

    Li, Biqing; Li, Zhao

    2018-04-01

    With the current level of social development, improved quality of life, existence and security issues of law and order has become an important issue. This graduation project adopts the form of wireless transmission, to STC89C52 microcontroller as the host control human infrared induction anti-theft monitoring system. The system mainly consists of main control circuit, power supply circuit, activities of the human body detection module, sound and light alarm circuit, record and display circuit. The main function is to achieve exploration activities on the human body, then the information is transmitted to the control panel, according to the system microcontroller program control sound and light alarm circuit, while recording the alarm location and time, and always check the record as required, and ultimately achieve the purpose of monitoring. The advantage of using pyroelectric infrared sensor can be installed in a hidden place, not easy to find, and low cost, good detection results, and has broad prospects for development.

  3. Installation and commissioning of a cryogen distribution system for the TPS project

    Science.gov (United States)

    Tsai, H. H.; Hsiao, F. Z.; Li, H. C.; Lin, M. C.; Wang, C.; Liao, W. R.; Lin, T. F.; Chiou, W. S.; Chang, S. H.; Chuang, P. S. D.

    2016-07-01

    A cryogen distribution system was installed and commissioned to transfer liquid nitrogen (LN2) and liquid helium (LHe) from storage dewars to superconducting radio-frequency (SRF) cavities for the 3-GeV Taiwan Photon Source (TPS) project. The cryogen distribution system comprises one distribution valve box (DVB), four control valve boxes (CVB) and seven sections of multichannel transfer line (MCL). The DVB distributes the LHe and LN2 to the CVB, and then to the SRF cavities through independent vacuum-jacketed transfer lines. The vaporized GHe and GN2 from the cryomodules are collected via the MCL. The cryogen distribution system was installed and commissioned from October 2014 to the end of March 2015. This paper presents the installation, pre-commissioning and commissioning of the cryogen distribution system, and describes the heat load test. Thermal acoustic oscillation (TAO) was found in the GHe process line; this phenomenon and its solution are also presented and discussed.

  4. Radiation exposure control by estimation of multiplication factors for online remote radiation monitoring systems at Vitrification Plant

    International Nuclear Information System (INIS)

    Deokar, Umesh V.; Kukarni, V.V.; Khot, A.R.; Mathew, P.; Kamlesh; Purohit, R.G.; Sarkar, P.K.

    2011-01-01

    Vitrification Plant is commissioned for vitrification of high-level liquid waste generated in Nuclear Fuel Cycle operations by using Joule Heated Ceramic Melter first time in India. Exposure control is a major concern in operating plant. Therefore, in addition to installed monitors, we have developed online remote radiation monitoring system to minimize number of entries in amber areas and to reduce the exposure to the surveyor and operator. This also helped in volume reduction of secondary waste. The reliability and accuracy of the online monitoring system is confirmed with actual measurements and by theoretical shielding calculations. The multiplication factors were estimated for remote online monitoring of Melter off Gas (MOG) filter, Hood filter, three exhaust filter banks, and overpack monitoring. This paper summarizes how the online remote monitoring system had helped in saving of 128.52 Person-mSv collective dose (14.28% of budgeted dose) and also there was 2.6 m 3 reduction in generation of Cat-I waste. (author)

  5. Experience with the upgraded VERONA-u WWER-440 core monitoring system

    International Nuclear Information System (INIS)

    Lux, I.; Vegh, J.; Adorjan, F.; Buerger, L.

    1994-01-01

    The paper describes the components, functioning and services of the VERONA-u core monitoring system recently installed at Unit 2 and 3 of the Hungarian Paks NPP. The VERONA-u is a totally upgraded and modernized version of the previous VERONA system, in the upgrading project the data-concentrator, the host computer and the operators' displays were replaced by state-of-the-art hardware and software components. Dual hardware redundancy and automatic function recovery actions were introduced in order to ensure high system availability. The man-machine interface has been redesigned completely, applying X Windows as Graphical User Interface. Improved core analysis and power reconstruction methods were introduced, together with a detailed hot-spot monitoring algorithm. A capable archivation module ensures periodic logging of all measured data, change sensitive storage of important signal changes and provides sophisticated post-mortem analysis tools. The upgraded system has been working satisfactorily on Unit 2 for a complete fuel cycle by now, the on-line system response in complex, transient situations is illustrated in the paper. (author). 10 refs, 4 figs

  6. EMISSION AND TRENDS IN RECLAIMING WASTE HEAT IN INDUSTRIAL INSTALATIONS

    Directory of Open Access Journals (Sweden)

    Lech Hys

    2013-04-01

    Full Text Available The article presents the analysis of waste heat emission in a typical industrial installation. On the basis of the process monitoring system, periodic analyses of fumes composition, installation process manual and the conducted measurements of the heat fluxes from individual sources emitting heat on the way of natural convection from the devices’ coats and forced convection in the fumes flux were calculated. According to the authors the heat of temperature 140–155 °C and surface power density 860–970 W/m2 emitted by devices’ covers can be reclaimed in ORC techniques, Peltier’s modules and the systems realising Stirling cycle. Part of the waste heat included in fumes, which makes c.a. 76% of the total emission from the installation, should be returned to the process of fuel oxidation, what will reduce the emission by c.a. 18% and the volume of consumed fuel by c.a. 25 m3 CH4/h, according to the presented calculations.

  7. Practical methods for radiation survey in nuclear installations

    International Nuclear Information System (INIS)

    Shweikani, R.

    2001-12-01

    This study is placed to those who are responsible to perform radiation survey in the nuclear installations, especially the beginners. Therefore, it gives a comprehensive view to all-important aspects related to their work starting from the structure of atoms to the practical steps for radiation survey works. So, it clarify how to perform personal monitoring, methods for monitoring surface contamination, methods for measuring radioactivity of gases and radioactive aerosols in air, monitoring radiation doses, measuring radiation influences in workplaces and finally measuring internal exposure of radiation workers in nuclear installations. Finally, The study shows some cases of breaches of radiation protection rules in some American nuclear installations and describes the final results of these breaches. The aim of this is to assure that any breach or ignore to radiation protection principles may produce bad results, and there is no leniency in implementing environmental radiation protection principles. (author)

  8. Designing remote monitoring systems for long term maintenance and reliability

    International Nuclear Information System (INIS)

    Davis, G.E.; Johnson, G.L.; Schrader, F.D.; Stone, M.A.; Wilson, E.F.

    2001-01-01

    Full text: As part of the effort to modernize safeguards equipment, the IAEA is continuing to acquire and install equipment for upgrading obsolete surveillance systems with digital technology; and providing remote-monitoring capabilities where and when economically justified. Remote monitoring is expected to reduce inspection effort, particularly at storage facilities and reactor sites. Remote monitoring technology will not only involve surveillance, but will also include seals, sensors, and other unattended measurement equipment. LLNL's experience with the Argus Security System offers lessons for the design, deployment, and maintenance of remote monitoring systems. Argus is an integrated security system for protection of high-consequence U.S. Government assets, including nuclear materials. Argus provides secure transmission of sensor data, administrative data, and video information to support intrusion detection and access control functions. LLNL developed and deployed the Argus system on its own site in 1988. Since that time LLNL has installed, maintained, and upgraded Argus systems at several Department of Energy and Department of Defense sites in the US as well as at the original LLNL site. Argus has provided high levels of reliability and integrity, as well as reducing overall lifecycle cost through incremental improvements to hardware and software. This philosophy permits expansion of functional capability, hardware upgrade and software upgrade without system outages and with minimum outage of local functions. This presentation will describe Argus design strategies and lessons learned from the Argus program as they apply to the design, development, and maintenance of a remote monitoring network. Hardware failures, software failures, and communication outages are expected and must be addressed by astute selection of system architecture. A combination of redundancy, diversity, and effective functional allocation between field and system level components should

  9. Application of an automated patrol-type monitoring system in the reinforced concrete containment vessel at Kashiwazaki-Kariwa Nuclear Power Plant Units 6 and 7

    International Nuclear Information System (INIS)

    Kimoto, T.; Senoh, M.; Hirakawa, H.; Tanaka, K.; Takahashi, M.

    1996-01-01

    An automated patrol-type monitoring system was applied to the first Advanced Boiling Water Reactor (ABWR) plants in the world, Kashiwazaki-Kariwa Nuclear Power Plant Units 6 and 7. The system consists of two robots traveling along monorail and several ITV systems. This monitoring system is used to watch the operating incident of key components of ABWR, such as water leakage from packing in Fine Motion Control Rod Drive (FM-CRD), Reactor Internal Pump (RIP) etc. which are located in the reinforced concrete containment and usually could not be accessible under operation. The traveling robots are equipped with the three kinds of sensors, an infrared camera, a color TV camera and a microphone, and have a capability to inspect the pre-determined inspection points guided by the monorail. This monitoring system is automatically turned on to start inspection at a scheduled time. For Units 6 and 7, this monitoring system, two robots and several ITV systems, can be controlled from one common control desk and one handy-type remote control panel. Since this monitoring system was installed at Kashiwazaki-Kariwa Nuclear Power Plant Units 6 and 7, this system has been operating successfully. (The installation and testing of the system for Unit 6 was finished completely and the testing the system for Unit 7 has been carrying out.) (author)

  10. Distributed monitoring system based on Icinga

    International Nuclear Information System (INIS)

    Haen, C.; Bonaccorsi, E.; Neufeld, N.

    2012-01-01

    The LHCb online system relies on a large and heterogeneous IT infrastructure: it comprises more than 2000 servers and embedded systems and more than 200 network devices. Many of these equipment are critical in order to run the experiment, and it is important to have a monitoring solution efficient enough so that the experts can diagnose and act quickly. While our previous system was based on a central Nagios server, our current system uses a distributed Icinga infrastructure. We have a single instance of Icinga that schedules the checks and deals with the results but we have other servers (called 'workers') to perform the checks. The load induced on the worker is negligible, whereas the central server is fully busy. A client/server model based on Gearman manages queues the clients use to get their tasks and give their results. The other interesting feature of Icinga is the database back-end. Icinga will log the result of every action and check-result in a database. The new installation is now running 36000 service checks on 2100 hosts with 50 Gearman workers. Performances have dramatically improved

  11. Investigations on installation of the heat exchange system in geothermal wells; Chinetsu koseinai netsukokan system donyu ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The heat exchange system in geothermal wells is a system that replaces the air source heat pump and uses underground beds or groundwater as a heat source to heat rooms by collecting underground heat in winter, and cool rooms in summer by operating a heat media circuit in reverse direction through the action of a reverse flow valve to discharge heat underground. This paper describes feasibility investigations on the system including its technical trend for introducing the system technology. Technological and economic discussions were given by classifying the intra-well heat exchange device in its installation direction (horizontal loop type and vertical installation type), underground heat exchange media (antifreeze solution/water cyclic system and direct expansion system), and underground heat transfer (heat conduction system and heat convection system). As a result of discussing each system, it was concluded that the following two systems are promising: A = vertical installation, antifreeze solution/water cyclic and heat conduction system, and B = vertical installation, antifreeze solution/water cyclic and heat convection system. Since the system B was found to have better efficiency and economy among both systems, it is necessary to verify an intra-well heat exchange system and operation methods that suit the system B effectively. 21 refs., 8 tabs.

  12. Plasma, a plant safety monitoring and assessment system for VVER-440 reactors

    Energy Technology Data Exchange (ETDEWEB)

    Hornaes, A.; Hulsund, J. E. [Institutt for energiteknikk (IFE), OECD Halden Reactor Project, Halden (Norway); Lipcsei, S.; Major, Cs.; Racz, A.; Vegh, J. [KFKI, Atomic Energy Research Institute, Budapest (Hungary); Eiler, J. [Paks, Nuclear Power Plant Ltd, Paks (Hungary)

    1999-05-15

    The objective with the Plant Safety Monitoring and Assessment System (PLASMA) is to develop an operator support system to support the execution of new symptom-based Emergency Operating Procedures for application in VVER reactors, with the Paks NPP in Hungary as the target plant. Many of the VVER reactors are rewriting their EOPs to comply more with Western standards of symptom-based EOPs. In this connection it is desirable to improve the data validation, information integration and presentation for operators when executing the EOPs. The entry-point to a symptom-oriented procedure is defined by the occurrence of a well-defined reactor operation status, with all its symptoms. However, the application of the EOF benefits from an operator support system, which performs plant status and symptom identification reliably and accurately. The development of the PLASMA system is a joint venture between Institutt for energiteknikk (IFE) and KFKI with the NPP Paks as the target plant. The project has been initiated and partly funded by the Science and Technology Agency (STA), Japan through the OECD NEA assistance program. In Hungary, considerable effort has concentrated on the safety reassessment of the Paks NPP and new EOPs are being written, but no comprehensive Operator Support System (OSS) for plant safety assessment is installed. Some safety parameter display functions are incorporated into diverse operator support systems, but an online 'plant safety monitoring and assessment system' is still missing. The present project comprises designing, constructing, testing and installing such an OSS, which to a great extent could support plant operators in their safety assessment work (author) (ml)

  13. Upgrading of data acquisition software for centralized radiation monitoring system in Malaysian Nuclear Agency

    Energy Technology Data Exchange (ETDEWEB)

    Yussup, F., E-mail: nolida@nm.gov.my; Ibrahim, M. M., E-mail: maslina-i@nm.gov.my; Soh, S. C.; Hasim, H. [Instrumentation and Automation Centre, Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Haris, M. F. [Information Technology Centre, Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Azman, A. [Prototype and Development Centre, Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Razalim, F. A. A.; Yapp, R. [Health Physics Group, Radiation Safety and Health Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Ramli, A. A. M. [Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia)

    2016-01-22

    With the growth of technology, many devices and equipments can be connected to the network and internet to enable online data acquisition for real-time data monitoring and control from monitoring devices located at remote sites. Centralized radiation monitoring system (CRMS) is a system that enables area radiation level at various locations in Malaysian Nuclear Agency (Nuklear Malaysia) to be monitored centrally by using a web browser. The Local Area Network (LAN) in Nuclear Malaysia is utilized in CRMS as a communication media for data acquisition of the area radiation levels from radiation detectors. The development of the system involves device configuration, wiring, network and hardware installation, software and web development. This paper describes the software upgrading on the system server that is responsible to acquire and record the area radiation readings from the detectors. The recorded readings are called in a web programming to be displayed on a website. Besides the main feature which is acquiring the area radiation levels in Nuclear Malaysia centrally, the upgrading involves new features such as uniform time interval for data recording and exporting, warning system and dose triggering.

  14. Upgrading of data acquisition software for centralized radiation monitoring system in Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Yussup, F.; Ibrahim, M. M.; Soh, S. C.; Hasim, H.; Haris, M. F.; Azman, A.; Razalim, F. A. A.; Yapp, R.; Ramli, A. A. M.

    2016-01-01

    With the growth of technology, many devices and equipments can be connected to the network and internet to enable online data acquisition for real-time data monitoring and control from monitoring devices located at remote sites. Centralized radiation monitoring system (CRMS) is a system that enables area radiation level at various locations in Malaysian Nuclear Agency (Nuklear Malaysia) to be monitored centrally by using a web browser. The Local Area Network (LAN) in Nuclear Malaysia is utilized in CRMS as a communication media for data acquisition of the area radiation levels from radiation detectors. The development of the system involves device configuration, wiring, network and hardware installation, software and web development. This paper describes the software upgrading on the system server that is responsible to acquire and record the area radiation readings from the detectors. The recorded readings are called in a web programming to be displayed on a website. Besides the main feature which is acquiring the area radiation levels in Nuclear Malaysia centrally, the upgrading involves new features such as uniform time interval for data recording and exporting, warning system and dose triggering

  15. Groundwater quality monitoring well installation for waste area grouping 7 and solid waste storage area 1, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    The purpose of this report is to document the drilling and installation of the groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 7 and at Solid Waste Storage Area (SWSA) 1, which is a part of WAG 1. Installation of GQM wells was required at Oak Ridge National Laboratory (ORNL) for regulatory compliance. Data obtained from these wells will be used to characterize and assess groundwater quality at the perimeter of each WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells in WAG 7 and SWSA 1 were drilled and developed during the period from June 1989 to March 1990

  16. Self-tracking optical beam monitor

    International Nuclear Information System (INIS)

    Miyahara, T.; Mitsuhashi, T.

    1992-01-01

    A new optical beam monitor with a self-tracking system was constructed and tested at an undulator beam line of the Photon Factory. The monitor has a feedback system to receive a constant part of the radiation and gives a large range of linearity. The beam position is read out through a linear encoder to detect the self-tracking movement of a pair of photocathodes. The monitor except the feedback system is totally bakeable and UHV compatible and can be installed at a VUV or a soft x-ray beam line

  17. Diagnostic and monitoring systems produced in Vuje, Okruzna 5, 918 64 Trnava, Slovak Republic

    International Nuclear Information System (INIS)

    Oksa, G.; Bahna, J.; Murin, V.; Kucharek, P.; Smutny, S.

    1996-01-01

    Based on the 20 years experience in on-line vibration diagnostics of mechanical components in the primary circuit of nuclear power plant PWR WWER-440, Vuje, Okruzna 5, 918 64 Trnava produces its own diagnostic and monitoring systems since 1990. The variety of diagnostic systems includes: loose part monitoring system (LPMS), monitoring system of main circulating pumps (MCPMS), vibration monitoring system (LVMS), leakage monitoring system (LMS). The emphasis in the hardware solution is put on the design modularity and versatility so that many subcomponents (circuit boards) are common or highly similar for all systems. Using exclusively digital data for processing enhances the reliability of the measurements and allows the easy data transportation from one computer to another (e.g., for more sophisticated analysis). Trends in the software development follow the similar path as for the hardware solution - namely, the modularity and versatility of software is the imperative goal. The modern operating systems also incorporate the ability of network communication, which is crucial for the integration of stand-alone diagnostic systems into nuclear power plants information system. So far a number of systems have been successfully installed: 6 LPMSs (Jaslovske Bohunice, Dukovany), 4 MCPMs (Jaslovske Bohunice) and 2 LVMSs (Jaslovske Bohunice), all systems operate in PWR WWER-440 environment. Another diagnostic systems are under construction: 2 LPMSs (Temelin, PWR WWER-1000), 2 MCMSs (Mochovce - PWR WWER-440) and 2 LMSs (Jaslovske Bohunice). (author). 1 fig

  18. Diagnostic and monitoring systems produced in Vuje, Okruzna 5, 918 64 Trnava, Slovak Republic

    Energy Technology Data Exchange (ETDEWEB)

    Oksa, G; Bahna, J; Murin, V; Kucharek, P; Smutny, S [Vyskumny Ustav Jadrovych Elektrarni, Trnava (Slovakia)

    1997-12-31

    Based on the 20 years experience in on-line vibration diagnostics of mechanical components in the primary circuit of nuclear power plant PWR WWER-440, Vuje, Okruzna 5, 918 64 Trnava produces its own diagnostic and monitoring systems since 1990. The variety of diagnostic systems includes: loose part monitoring system (LPMS), monitoring system of main circulating pumps (MCPMS), vibration monitoring system (LVMS), leakage monitoring system (LMS). The emphasis in the hardware solution is put on the design modularity and versatility so that many subcomponents (circuit boards) are common or highly similar for all systems. Using exclusively digital data for processing enhances the reliability of the measurements and allows the easy data transportation from one computer to another (e.g., for more sophisticated analysis). Trends in the software development follow the similar path as for the hardware solution - namely, the modularity and versatility of software is the imperative goal. The modern operating systems also incorporate the ability of network communication, which is crucial for the integration of stand-alone diagnostic systems into nuclear power plants information system. So far a number of systems have been successfully installed: 6 LPMSs (Jaslovske Bohunice, Dukovany), 4 MCPMs (Jaslovske Bohunice) and 2 LVMSs (Jaslovske Bohunice), all systems operate in PWR WWER-440 environment. Another diagnostic systems are under construction: 2 LPMSs (Temelin, PWR WWER-1000), 2 MCMSs (Mochovce - PWR WWER-440) and 2 LMSs (Jaslovske Bohunice). (author). 1 fig.

  19. Operational benefits obtained by implementing a remote monitoring and control system at CEGAS (Gas Company of Ceara, Brazil)

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Rui C.O. [Companhia de Gas do Ceara (CEGAS), Fortaleza, CE (Brazil); Zamponha, Rogerio S. [SOFTBRASIL, Sao Paulo, SP (Brazil)

    2009-07-01

    CEGAS (Gas Company of Ceara) recently implemented an automated remote monitoring and control system at the Natural Gas Stations located within the city of Fortaleza. The main purposes to implement the project were to install a better operational platform, allowing CEGAS to analyze its operational conditions and to measure customer's consumption in real time. The data communication infra-structure chosen was GPRS/GSM, due to it's low deployment cost and coverage availability. The first phase of the project comprised 50 vehicular natural gas stations. The project was successfully installed, and became the 1{sup st} project at this type to run efficiently over a GPRS infra-structure in Brazil for gas monitoring, with reliable control and data communication. This document intends to present the reasons that lead CEGAS to invest in such a system, the technology deployed and the benefits achieved. (author)

  20. Development of a portable Linux-based ECG measurement and monitoring system.

    Science.gov (United States)

    Tan, Tan-Hsu; Chang, Ching-Su; Huang, Yung-Fa; Chen, Yung-Fu; Lee, Cheng

    2011-08-01

    This work presents a portable Linux-based electrocardiogram (ECG) signals measurement and monitoring system. The proposed system consists of an ECG front end and an embedded Linux platform (ELP). The ECG front end digitizes 12-lead ECG signals acquired from electrodes and then delivers them to the ELP via a universal serial bus (USB) interface for storage, signal processing, and graphic display. The proposed system can be installed anywhere (e.g., offices, homes, healthcare centers and ambulances) to allow people to self-monitor their health conditions at any time. The proposed system also enables remote diagnosis via Internet. Additionally, the system has a 7-in. interactive TFT-LCD touch screen that enables users to execute various functions, such as scaling a single-lead or multiple-lead ECG waveforms. The effectiveness of the proposed system was verified by using a commercial 12-lead ECG signal simulator and in vivo experiments. In addition to its portability, the proposed system is license-free as Linux, an open-source code, is utilized during software development. The cost-effectiveness of the system significantly enhances its practical application for personal healthcare.

  1. Vehicle Radiation Monitoring Systems for Medical Waste Disposal - 12102

    Energy Technology Data Exchange (ETDEWEB)

    Kondrashov, Vladislav S.; Steranka, Steve A. [RadComm Systems Corp., 2931 Portland Dr., Oakville, ON L6H 5S4 (Canada)

    2012-07-01

    Hospitals often declare their waste as being 'non-radioactive'; however this material often has excessive levels of radiation caused either by an accident or lack of control. To ensure the best possible protection against the accidental receipt of radioactive materials and as a safety precaution for their employees, waste-handling companies have installed large-scale radiation portal monitors at their weigh scales or entry gates of the incinerator plant, waste transfer station, and/or landfill. Large-volume plastic scintillator-based systems can be used to monitor radiation levels at entry points to companies handling medical waste. The recent and intensive field tests together with the thousands of accumulated hours of actual real-life vehicle scanning have proven that the plastic scintillation based system is an appropriate radiation control instrument for waste management companies. The Real-Time background compensation algorithm is flexible with automatic adjustable coefficients that will response to rapidly changing environmental and weather conditions maintaining the preset alarm threshold levels. The Dose Rate correction algorithms further enhance the system's ability to meet the stringent requirements of the waste industries need for Dose Rate measurements. (authors)

  2. Radiation exposure control by estimation of multiplication factors for online remote radiation monitoring systems at vitrification plant

    International Nuclear Information System (INIS)

    Deokar, U.V.; Kulkarni, V.V.; Khot, A.R.; Mathew, P.; Kamlesh; Purohit, R.G.; Sarkar, P.K.

    2012-01-01

    Vitrification Plant is commissioned for vitrification of high level liquid waste (HLW) generated in nuclear fuel cycle operations by using Joule Heated Ceramic Melter first time in India. Exposure control is a major concern in operating plant. Therefore in addition to installed monitors, we have developed online remote radiation monitoring system to minimize number of entries in amber areas and to reduce the exposure to the surveyor and operator. This also helped in volume reduction of secondary waste. The reliability and accuracy of the online monitoring system is confirmed with actual measurements and by theoretical shielding calculations. The multiplication factors were estimated for remote on line monitoring of Melter Off Gas (MOG) filter, Hood filter, three exhaust filter banks, and over-pack monitoring. This paper summarizes - how the online remote monitoring system helped in saving of 128.52 person-mSv collective dose (14.28% of budgeted dose). The system also helped in the reduction of 2.6 m 3 of Cat-I waste. Our online remote monitoring system has helped the plant management to plan in advance for replacement of these filters, which resulted in considerable saving in collective dose and secondary waste

  3. Permanent cathodic protection monitoring systems for offshore pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Britton, Jim [Deepwater Corrosion Services Inc., Houston, TX (United States)

    2009-07-01

    Historically offshore pipeline cathodic protection monitoring has relied on the use of portable survey techniques. This has typically relied on ROV assisted or surface deployed survey methods. These methods have been shown to have technical as well as economic shortcomings, this is particularly true of buried offshore pipelines where accuracy is always questionable. As more focus is being placed on offshore pipeline integrity, it was time for a new method to emerge. The technology discussed involves the retro-placement of permanent clamp-on monitors onto the pipeline which can measure pipeline to seawater potential as well as current density. The sensors can be interrogated locally using light powered subsea voltage readouts. Application of the technology can be either during pipeline construction, during installation of life extension CP systems, or during routine subsea pipeline interventions. The new method eliminates the need for long cables or expensive acoustic or modulated data transfer and provides all the information required to fully verify CP system performance, thus eliminating the need for expensive close-interval surveys. Some deployment case histories will be presented along with feasibility of application on deep water pipelines and comparative economics. (author)

  4. 40 CFR 60.274 - Monitoring of operations.

    Science.gov (United States)

    2010-07-01

    ... system is in use, and a furnace static pressure gauge is installed according to paragraph (f) of this... volumetric flow rate through each separately ducted hood; or install, calibrate, and maintain a monitoring device that continuously records the volumetric flow rate at the control device inlet and check and...

  5. Integrated systems of monitoring and environmental data processing for nuclear facilities

    International Nuclear Information System (INIS)

    Diaconu, C.; Guta, V.; Oprea, I.; Oprea, M.; Stoica, M.; Pirvu, V.; Vasilache, E.; Pirvu, I.

    2001-01-01

    The processing of huge amount of data necessary to assess the real radiological situation both in normal operational conditions and during accidents requires an efficient system of monitoring and data processing. It must be able to secure information for the complex systems of radioactivity control aiming at evaluating the nuclear accident consequences and establishing a basis for correct decision making in the field of civil protection. The integrated environmental monitoring systems are based on a number of fixed and mobile installations, a meteorological parameter measurement station, a center for data processing and a communication network, working all under the control of a real-time operation system. They collect, and process the radioactivity level and meteorological data and transmit them through the communication network. The local monitoring stations are made of detector ensembles with pressurized ionization chambers and autonomous units providing continuously information on dose and integrated rates, average values as well as the current state of the station. The meteorological data acquisition station supplies information concerning wind direction and speed, the temperature and precipitation level. The information processing center is based on a PC integrated in a local network which collects data from the radiation monitoring equipment, meteorological station as well as other work stations which process various dosimetric parameters. It is connected to Internet, so ensuring fast transfer of information towards interested authorities. The communication network consists in a local or extended Ethernet network, radio or serial connections for radioactivity level monitoring units which can be stationary, portable or mobile. Requirements raised by the application of geographic information system (GIS) and the real time operation system (QNX) ensuring multiuser and multitask operations are discussed

  6. Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance

  7. Development of a fully automated network system for long-term health-care monitoring at home.

    Science.gov (United States)

    Motoi, K; Kubota, S; Ikarashi, A; Nogawa, M; Tanaka, S; Nemoto, T; Yamakoshi, K

    2007-01-01

    Daily monitoring of health condition at home is very important not only as an effective scheme for early diagnosis and treatment of cardiovascular and other diseases, but also for prevention and control of such diseases. From this point of view, we have developed a prototype room for fully automated monitoring of various vital signs. From the results of preliminary experiments using this room, it was confirmed that (1) ECG and respiration during bathing, (2) excretion weight and blood pressure, and (3) respiration and cardiac beat during sleep could be monitored with reasonable accuracy by the sensor system installed in bathtub, toilet and bed, respectively.

  8. A new stack effluent monitoring system at the Risoe Hot Cell plant

    International Nuclear Information System (INIS)

    Boetter-Jensen, L.; Hedemann Jensen, P.; Lauridsen, B.

    1984-06-01

    This report describes a new stack effluent monitoring system that has been installed at the Hot Cell facility. It is an integrating iodine/particulate system consisting of a γ-shielded flow house in which a continous air sample from the ventilation channel ia sucked through coal and glass filter papers. Activity is accumulated on the filter papers and a thin plastic scintillator detects the β-radiation from the trapped iodine or particulate activity. The stack effluent monitoring system has a two-step regulating function as applied to the ventilation system, first switching it to a recirculating mode, and finally to building-seal after given releases of 131 I. The collection efficiency for iodine in form of elementary iodine (I 2 ) and methyliodide (CH 3 I) has been determined experimentally. The unwanted response from a noble gas release has also been determined from experiments. The noble gas response was determined from puff releases of the nuclide 41 Ar in the concrete cells. It is concluded that the iodine/particulate system is extremely sensitive and that it can easily detect iodine or particulate releases as low as a few MBq. A gamma monitor placed in connection with the iodine/particulate system detects Xe/Kr-releases as low as a few tens of MBq per second. (author)

  9. Solar heating and hot water system installed at Charlotte Memorial Hospital, Charlotte, North Carolina

    Science.gov (United States)

    1981-01-01

    Detailed information regarding the design and installation of a heating and hot water system in a commercial application is given. This information includes descriptions of system and building, design philosophy, control logic operation modes, design and installation drawing and a brief description of problems encountered and their solutions.

  10. Radiation monitoring at Sizewell B PWR

    International Nuclear Information System (INIS)

    Hills, O.C.

    1992-01-01

    Radiation monitoring in Sizewell-B Power Station most significantly differs from that in existing UK Power Stations in two respects: firstly in the large number of on-line radiation monitors and secondly in the way that the monitors are linked into a fully-integrated, centralised data acquisition and display system, which can be accessed and viewed by the operators. An overview is given of how full process data is transmitted along data links between the Auxiliary Shut-Down Room, Technical Support Centre and Main Control Room, enabling Health Physics and other staff to access information from any radiation monitor. The permanently installed monitors together with the safety category, type and location are listed. As part of the Sizewell-B Process Plant control and instrumentation contract, NEI is to supply the Health Physics Instrumentation (HPI) and Process and Effluent Activity Monitoring System (PEAMS) (excluding the Primary Protection System) plus the Nuclear Sampling System (NSS). This paper concentrates on the HPI, and parts of the PEAMS and NSS for which NEI have the responsibility for system design, detail design, manufacture, site installation and commissioning. Section 2 briefly describes the sources of radiation at Sizewell-B; Sections 3, 4 and 5 describe the PEAMS, HPI and NSS respectively. Section 6 details the design of two of the Sizewell-B PEAMS subsystems. (Author)

  11. Test-bed for the remote health monitoring system for bridge structures using FBG sensors

    Science.gov (United States)

    Lee, Chin-Hyung; Park, Ki-Tae; Joo, Bong-Chul; Hwang, Yoon-Koog

    2009-05-01

    This paper reports on test-bed for the long-term health monitoring system for bridge structures employing fiber Bragg grating (FBG) sensors, which is remotely accessible via the web, to provide real-time quantitative information on a bridge's response to live loading and environmental changes, and fast prediction of the structure's integrity. The sensors are attached on several locations of the structure and connected to a data acquisition system permanently installed onsite. The system can be accessed through remote communication using an optical cable network, through which the evaluation of the bridge behavior under live loading can be allowed at place far away from the field. Live structural data are transmitted continuously to the server computer at the central office. The server computer is connected securely to the internet, where data can be retrieved, processed and stored for the remote web-based health monitoring. Test-bed revealed that the remote health monitoring technology will enable practical, cost-effective, and reliable condition assessment and maintenance of bridge structures.

  12. Effectiveness of Devices to Monitor Biofouling and Metals Deposition on Plumbing Materials Exposed to a Full-Scale Drinking Water Distribution System

    OpenAIRE

    Ginige, Maneesha P.; Garbin, Scott; Wylie, Jason; Krishna, K. C. Bal

    2017-01-01

    A Modified Robbins Device (MRD) was installed in a full-scale water distribution system to investigate biofouling and metal depositions on concrete, high-density polyethylene (HDPE) and stainless steel surfaces. Bulk water monitoring and a KIWA monitor (with glass media) were used to offline monitor biofilm development on pipe wall surfaces. Results indicated that adenosine triphosphate (ATP) and metal concentrations on coupons increased with time. However, bacterial diversities decreased. Th...

  13. The development of ex-core neutron flux monitoring system for integral reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J. K.; Kwon, H. J.; Park, H. Y.; Koo, I. S

    2004-12-01

    Due to the arrangement of major components within the reactor vessel, the integral reactor has relatively long distance between the core support barrel and the reactor vessel when compared with the currently operating plants. So, a neutron flux leakage at the ex-vessel represents a relatively low flux level which may generate some difficulties in obtaining a wide range of neutron flux information including the source range one. This fact may have an impact upon the design and fabrication of an ex-core neutron flux detector. Therefore, it is required to study neutron flux detectors that are suitable for the installation location and characteristics of an integral reactor. The physical constraints of an integral reactor should be considered when one designs and develops the ex-core neutron flux monitoring detectors and their systems. As a possible installation location of the integral reactor ex-core neutron flux detector assembly, two candidate locations are considered, that is, one is between the core support barrel and the reactor vessel and the other is within the Internal Shielding Tank(IST). And, for these locations, some factors such as the environmental requirements and geometrical restrictions are investigated In the case of considering the inside of the IST as a ex-core neutron flux detector installation position, an electrical insulation problem and a low neutron flux measurement problem arose and when considering the inside of the reactor vessel, a detector's sensitivity variation problem, an electrical insulation problem, a detector's insertion and withdrawal problem, and a high neutron flux measurement problem were encountered. Through a survey of the detector installation of the currently operating plants and detector manufacturer's products, the proposed structure and specifications of an ex-core neutron flux detector are suggested. And, the joint ownership strategy for a proposed detector model is also depicted. At the end, by studying

  14. The development of ex-core neutron flux monitoring system for integral reactor

    International Nuclear Information System (INIS)

    Lee, J. K.; Kwon, H. J.; Park, H. Y.; Koo, I. S.

    2004-12-01

    Due to the arrangement of major components within the reactor vessel, the integral reactor has relatively long distance between the core support barrel and the reactor vessel when compared with the currently operating plants. So, a neutron flux leakage at the ex-vessel represents a relatively low flux level which may generate some difficulties in obtaining a wide range of neutron flux information including the source range one. This fact may have an impact upon the design and fabrication of an ex-core neutron flux detector. Therefore, it is required to study neutron flux detectors that are suitable for the installation location and characteristics of an integral reactor. The physical constraints of an integral reactor should be considered when one designs and develops the ex-core neutron flux monitoring detectors and their systems. As a possible installation location of the integral reactor ex-core neutron flux detector assembly, two candidate locations are considered, that is, one is between the core support barrel and the reactor vessel and the other is within the Internal Shielding Tank(IST). And, for these locations, some factors such as the environmental requirements and geometrical restrictions are investigated In the case of considering the inside of the IST as a ex-core neutron flux detector installation position, an electrical insulation problem and a low neutron flux measurement problem arose and when considering the inside of the reactor vessel, a detector's sensitivity variation problem, an electrical insulation problem, a detector's insertion and withdrawal problem, and a high neutron flux measurement problem were encountered. Through a survey of the detector installation of the currently operating plants and detector manufacturer's products, the proposed structure and specifications of an ex-core neutron flux detector are suggested. And, the joint ownership strategy for a proposed detector model is also depicted. At the end, by studying the ex

  15. Results of hydrologic monitoring on landslide-prone coastal bluffs near Mukilteo, Washington

    Science.gov (United States)

    Smith, Joel B.; Baum, Rex L.; Mirus, Benjamin B.; Michel, Abigail R.; Stark, Ben

    2017-08-31

    A hydrologic monitoring network was installed to investigate landslide hazards affecting the railway corridor along the eastern shore of Puget Sound between Seattle and Everett, near Mukilteo, Washington. During the summer of 2015, the U.S. Geological Survey installed monitoring equipment at four sites equipped with instrumentation to measure rainfall and air temperature every 15 minutes. Two of the four sites are installed on contrasting coastal bluffs, one landslide scarred and one vegetated. At these two sites, in addition to rainfall and air temperature, volumetric water content, pore pressure, soil suction, soil temperature, and barometric pressure were measured every 15 minutes. The instrumentation was designed to supplement landslide-rainfall thresholds developed by the U.S. Geological Survey with a long-term goal of advancing the understanding of the relationship between landslide potential and hydrologic forcing along the coastal bluffs. Additionally, the system was designed to function as a prototype monitoring system to evaluate criteria for site selection, instrument selection, and placement of instruments. The purpose of this report is to describe the monitoring system, present the data collected since installation, and describe significant events represented within the dataset, which is published as a separate data release. The findings provide insight for building and configuring larger, modular monitoring networks.

  16. The fault monitoring and diagnosis knowledge-based system for space power systems: AMPERES, phase 1

    Science.gov (United States)

    Lee, S. C.

    1989-01-01

    The objective is to develop a real time fault monitoring and diagnosis knowledge-based system (KBS) for space power systems which can save costly operational manpower and can achieve more reliable space power system operation. The proposed KBS was developed using the Autonomously Managed Power System (AMPS) test facility currently installed at NASA Marshall Space Flight Center (MSFC), but the basic approach taken for this project could be applicable for other space power systems. The proposed KBS is entitled Autonomously Managed Power-System Extendible Real-time Expert System (AMPERES). In Phase 1 the emphasis was put on the design of the overall KBS, the identification of the basic research required, the initial performance of the research, and the development of a prototype KBS. In Phase 2, emphasis is put on the completion of the research initiated in Phase 1, and the enhancement of the prototype KBS developed in Phase 1. This enhancement is intended to achieve a working real time KBS incorporated with the NASA space power system test facilities. Three major research areas were identified and progress was made in each area. These areas are real time data acquisition and its supporting data structure; sensor value validations; development of inference scheme for effective fault monitoring and diagnosis, and its supporting knowledge representation scheme.

  17. Installation of a second trip system

    International Nuclear Information System (INIS)

    Bessada, E.

    1997-01-01

    Since its first criticality in 1957, the NRU reactor has been operating safely and efficiently supporting the CANDU reactor's research and development programs and producing radioisotopes for medical use. To ensure that the reactor continues to operate safely and effectively, Atomic Energy of Canada Limited (AECL) commissioned a team in 1989 to conduct a systematic review and assessment of the reactor condition. The outcome of the study indicated that the overall condition of the reactor is good and that it is being operated safely. The study also produced recommendations as to where safety can be improved. These recommendations are the basis of the upgrade program currently being implemented in the reactor. The Second Trip System (STS) is part of the upgrade program. It is a stand alone seismically qualified trip system that operates independently from the existing first trip system (FST) to shutdown the reactor. This paper discusses the design, installation and the inactive commissioning of the system, and the process used to ensure that the system can be retrofitted to the reactor without affecting its safety or its operational requirements. (author)

  18. Industrial process. Solartron installs the KME measuring and testing system at Civaux

    International Nuclear Information System (INIS)

    Foucher, N.

    1997-01-01

    The Solartron company wined the European call for offer of EdF/CNEPE for the installation of the KME measuring and testing system on the first unit of the Civaux nuclear power plant (France). This system is based on the IMP centralized measurement system, the SNET network and a SNET/ETHERNET interface. Measurement electronic devices are installed in the vicinity of the sensors which reduces the costs and the wires length. Logical and analogical data acquisition is performed by 35 IMP systems which can be connected to 72 different points. The communication with the PATERN data management system is performed by a second independent ETHERNET network. This system ensures the database management and the calculation of the thermodynamical, mechanical and electrical parameters. (J.S.)

  19. Analysis of financial support for photovoltaic system installation with the economic simulation model

    International Nuclear Information System (INIS)

    Imamura, E.; Uchiyama, Y.

    1994-01-01

    The authors developed a penetration method of dispersed generation technologies and tried to investigate economic simulation on photovoltaic systems. The model is composed of several analysis modules; a technology application module, a regional meteorology module, cost modules such as capital cost, power generation cost, marginal cost and avoided cost, and a logistic penetration module. The database management system of application forms, meteorological data, energy demand and equipment costs is also developed to support the model. The main purpose of the study is to make clear impacts to the power supply configuration and cost/benefit effects when PV systems are installed into several different sectors in Japan. The ultimate potential of PV system is 235, 103MWp and its market potential is 15,172 MWp in Japan. Market penetration highly depends on cost learning factors of several components of PV system. The installed capacity with 50% subsidy is 5 times larger than that with 67%. In conclusion, it is feasible for government or utilities to financially support the promotion and installation of PV systems as the electricity supply system

  20. Structural health monitoring system for bridges based on skin-like sensor

    Science.gov (United States)

    Loupos, Konstantinos; Damigos, Yannis; Amditis, Angelos; Gerhard, Reimund; Rychkov, Dmitry; Wirges, Werner; Schulze, Manuel; Lenas, Sotiris-Angelos; Chatziandreoglou, Christos; Malliou, Christina M.; Tsaoussidis, Vassilis; Brady, Ken; Frankenstein, Bernd

    2017-09-01

    Structural health monitoring activities are of primal importance for managing transport infrastructure, however most SHM methodologies are based on point-based sensors that have limitations in terms of their spatial positioning requirements, cost of development and measurement range. This paper describes the progress on the SENSKIN EC project whose objective is to develop a dielectric-elastomer and micro-electronics-based sensor, formed from a large highly extensible capacitance sensing membrane supported by advanced microelectronic circuitry, for monitoring transport infrastructure bridges. Such a sensor could provide spatial measurements of strain in excess of 10%. The actual sensor along with the data acquisition module, the communication module and power electronics are all integrated into a compact unit, the SENSKIN device, which is energy-efficient, requires simple signal processing and it is easy to install over various surface types. In terms of communication, SENSKIN devices interact with each other to form the SENSKIN system; a fully distributed and autonomous wireless sensor network that is able to self-monitor. SENSKIN system utilizes Delay-/Disruption-Tolerant Networking technologies to ensure that the strain measurements will be received by the base station even under extreme conditions where normal communications are disrupted. This paper describes the architecture of the SENSKIN system and the development and testing of the first SENSKIN prototype sensor, the data acquisition system, and the communication system.

  1. Design of a New Collimation System to Prevent Interference between X-ray Machines and Radiation Portal Monitors

    International Nuclear Information System (INIS)

    Guzzardo, Tyler; Livesay, Jake

    2012-01-01

    Researchers at Oak Ridge National Laboratory (ORNL) developed a new collimation system that allows radiation portal monitors (RPMs) installed near x-ray machines to operate with a negligible false-positive alarm rate. RPMs are usually installed as far as possible from x-ray machines because false alarms are triggered by escaping x-rays; however, constraints at the installation site sometimes make it necessary that RPMs be installed near x-ray machines. Such RPMs are often plagued by high alarm rates resulting from the simultaneous operation of the RPMs and x-ray machines. Limitations on pedestrian flow, x-ray machine orientation, and RPM location often preclude a simple solution for lowering the alarm rate. Adding additional collimation to the x-ray machines to stop the x-rays at the source can reduce the alarm rate without interfering with site operations or adversely affecting the minimum detectable quantity of material (MDQ). A collimation design has been verified by measurements conducted at a RPM installation site and is applicable to all new and existing RPM installations near x-ray machines.

  2. IMIS: Integrated Marine Installation System for offshore turbines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The report describes a feasibility study on the Integrated Marine Installation System for offshore wind turbines. The aspects covered are (1) Background and why the study is required; (2) Aims and objectives of the project; (3) Summary of methods adopted; (4) Design criteria according to the area for deployment; (5) Conclusions and recommendations. The ultimate goal will be to install and secure the wind turbine in position using an integrated approach to avoid using lifting vessels. To date, an initial feasibility study has been carried out where four different concepts were considered. The next phase of the project will be to address a number of possible risks and constraints before the chosen concept can be demonstrated to be viable. The work is being carried out by Setech Ltd, Armstrong Technology Associates Ltd and Smith Rea Energy Ltd for the DTI.

  3. The modularization construction of piping system installation in AP1000 plant

    International Nuclear Information System (INIS)

    Lu Song; Wang Yuan; Wei Junming

    2012-01-01

    Modularization construction is the main technique used in AP1000 plants, the piping Modularization installation will impact directly to the module construction as the important part of the Modularization construction. After the piping system has took the modularization design in AP1000 plants, some installation works of piping system has moved from the site to fabrication shop. With improving the construction quality and minimizing the time frame of project, the critical paths can be optimized. This paper has analyzed the risk and challenge that met during the modularization construction period of piping systems though introducing the characteristic of modularization construction for AP1000 piping systems, and get construction experiences from the First AP1000 plants in the world, then it will be the firmly basics for the wide application of modularization construction in the future. (authors)

  4. Status analysis for the confinement monitoring technology of PWR spent nuclear fuel dry storage system

    Energy Technology Data Exchange (ETDEWEB)

    Baeg, Chang Yeal; Cho, Chun Hyung [Korea Radioactive Waste Agency, Daejeon (Korea, Republic of)

    2016-03-15

    Leading national R and D project to design a PWR spent nuclear fuel interim dry storage system that has been under development since mid-2009, which consists of a dual purpose metal cask and concrete storage cask. To ensure the safe operation of dry storage systems in foreign countries, major confinement monitoring techniques currently consist of pressure and temperature measurement. In the case of a dual purpose metal cask, a pressure sensor is installed in the interspace of bolted double lid(primary and secondary lid) in order to measure pressure. A concrete storage cask is a canister based system made of double/redundant welded lid to ensure confinement integrity. For this reason, confinement monitoring method is real time temperature measurement by thermocouple placed in the air flow(air intake and exit) of the concrete structure(over pack and module). The use of various monitoring technologies and operating experiences for the interim dry storage system over the last decades in foreign countries were analyzed. On the basis of the analysis above, development of the confinement monitoring technology that can be used optimally in our system will be available in the near future.

  5. Performance Monitoring of Residential Hot Water Distribution Systems

    Energy Technology Data Exchange (ETDEWEB)

    Liao, Anna; Lanzisera, Steven; Lutz, Jim; Fitting, Christian; Kloss, Margarita; Stiles, Christopher

    2014-08-11

    Current water distribution systems are designed such that users need to run the water for some time to achieve the desired temperature, wasting energy and water in the process. We developed a wireless sensor network for large-scale, long time-series monitoring of residential water end use. Our system consists of flow meters connected to wireless motes transmitting data to a central manager mote, which in turn posts data to our server via the internet. This project also demonstrates a reliable and flexible data collection system that could be configured for various other forms of end use metering in buildings. The purpose of this study was to determine water and energy use and waste in hot water distribution systems in California residences. We installed meters at every end use point and the water heater in 20 homes and collected 1s flow and temperature data over an 8 month period. For a typical shower and dishwasher events, approximately half the energy is wasted. This relatively low efficiency highlights the importance of further examining the energy and water waste in hot water distribution systems.

  6. A Labview Based Leakage Current Monitoring System For HV Insulators

    Directory of Open Access Journals (Sweden)

    N. Mavrikakis

    2015-10-01

    Full Text Available In this paper, a Labview based leakage current monitoring system for High Voltage insulators is described. The system uses a general purpose DAQ system with the addition of different current sensors. The DAQ system consists of a chassis and hot-swappable modules. Through the proper design of current sensors, low cost modules operating with a suitable input range can be employed. Fully customizable software can be developed using Labview, allowing on-demand changes and incorporation of upgrades. Such a system provides a low cost alternative to specially designed equipment with the added advantage of maximum flexibility. Further, it can be modified to satisfy the specifications (technical and economical set under different scenarios. In fact, the system described in this paper has already been installed in the HV Lab of the TEI of Crete whereas a variation of it is currently in use in TALOS High Voltage Test Station.

  7. Installing a HDPE vertical containment and collection system in one pass utilizing a deep trencher

    International Nuclear Information System (INIS)

    Bocchino, W.M.; Burson, B.

    1997-01-01

    A unique method has been developed to install high density polyethylene (HDPE) vertical containment panels and a horizontal collection system for the containment and collection of contaminated groundwater. Unlike other means of creating this type of system, this barrier wall and collection system is installed in one step and in one narrow trench, utilizing a one-pass deep trencher. Originally HDPE vertical barriers were installed using conventional slurry trenching techniques. Use of this method raised questions of trench stability and disposal costs for the trench spoils. In addition, if a collection system was desired, a separate trench or vertical wells were required. In response to these concerns, a trenchless vibratory installation method was developed. Although this method addressed the concerns of trench stability and disposal costs, it raised a whole new set of concerns dealing with drivable soil conditions, buried debris and obstructions. Again, if a collection system was desired, a separate trench or vertical wells had to be installed. The latest development, the one-pass, deep trencher, has eliminated or significantly reduced the previously discussed construction concerns. The trencher methods reduce the amount of spoils generated because a trench width of 61 cm (24 inches) is constantly maintained by the machine. Additionally, soil classification and density are not as critical as with a vibratory installation. This is due to the trencher's ability to trench in all but the hardest of materials (blow counts exceeding 35 blows/ft). Finally, the cost to add a collection system adjacent to the cutoff wall is substantially reduced and is limited only to the cost of the additional hydraulic fill and 4 inches HDPE collection piping. The trench itself is already constructed with the installation of the wall

  8. Design and Development a Control and Monitoring System for Greenhouse Conditions Based-On Multi Agent System

    Directory of Open Access Journals (Sweden)

    Seyed Hamidreza Kasaei

    2011-12-01

    Full Text Available The design of a multi-agent system for integrated management of greenhouse production is described. The model supports the integrated greenhouse production, with targets set to quality and quantity of produce with the minimum possible cost in resources and environmental consequences.
    In this paper, we propose a real time and robust system for monitoring and control of the greenhouse condition which can automatically control of greenhouse temperature, lights, humidity, CO2 concentration, sunshine, pH, salinity, water available, soil temperature and soil nutrient for efficient production. We will propose a multi-agent methodology for integrated management systems in greenhouses. In this regards wireless sensor networks play a vital role to monitor
    greenhouse and environment parameters. Each control process of the greenhouse environment is modeled as an autonomous agent with its own inputs, outputs and its own interactions with the other agents. Each agent acts autonomously, as it knows a priori the desired environmental setpoints. Many researchers have been making attempts to develop the greenhouse environment management system. The existing environment management systems are bulky, very costly and difficult to maintain. In the last years, Multi Agent Systems and Wireless Sensor Networks are becoming important solutions to this problem. This paper describes the implementation and
    configuration of the wireless sensor network to monitor and control various parameter of greenhouse. The developed system is simple, cost effective, and easily installable.

  9. Remote monitoring technical review for light water reactors (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Park, Seung Sik; Yoon, Wan Ki; Na, Won Woo; Kwack, Eun Ho [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-10-01

    The IAEA has been conducting a field trial of a Remote Monitoring System (RMS) at the spent fuel storage, Younggwang 3 nuclear power plant. The system installation plan was initiated after the agreement in the 7th ROK-IAEA safeguards Implementation Review Meeting that was held in Soul, 1998. It describes that IAEA and Korea proceed RM tasks Implementation of RMS at LWRs in the ROK for field trials. The project of RMS is conducting through 3 stages with timing. RMS has been installed for the Phase I of field trial, one of two stages at Younggwang Unit 3 in October 1998. The RMS consists of video systems and a seal at the spent fuel pond area. This report provides a description of the monitoring system and its functions focusing on several technical points of the installation and its 6 month operation at Younggwang Unit 3. Subjects are selected and analyzed in the three chapters, IAEA safeguards policy on Remote Monitoring, the technology, and field test experiences. 8 refs., 12 figs., 12 tabs. (Author)

  10. A modern concept for status oriented vibration monitoring of big turbogenerators

    International Nuclear Information System (INIS)

    Herz, F.; Theodor, P.

    1997-01-01

    The investigation of mechanical vibrations is an excellent method of showing the current condition of a machine. This paper deals with the vibrations monitoring of large turbo-generators. First the general aspects of monitoring, as well as diagnostic strategies and impact on the operation of the installation is discussed. An example of a condition-oriented vibration monitoring is the description of the 'Vibroview' system recently developed and installed in the Leibstadt nuclear power plant. (author) 16 figs., tabs., refs

  11. 40 CFR 60.274a - Monitoring of operations.

    Science.gov (United States)

    2010-07-01

    ... system is in use, and a furnace static pressure gauge is installed according to paragraph (f) of this... volumetric flow rate through each separately ducted hood; or install, calibrate, and maintain a monitoring device that continuously records the volumetric flow rate at the control device inlet and check and...

  12. Design and installation of a system of quality for the specialized services of irradiation

    International Nuclear Information System (INIS)

    Rodriguez, Y.; Romero, M.; Castillo, E.; Villoch, A.; Cruz, S.

    1999-01-01

    This study is traced as objective the the design and installation of a System of Quality of agreement to the norm ISO 9002 and the NC-ISO/IEC Guide 25. For this a program was elaborated that it embraced the following phases: organization, installation and maintenance of the system. The elements that would conform the whole program of quality of the irradiation services they would be given from the qualification of the material to process until the certification of the dose imparted to the product; as well as the internal and external control of the quality in the own one installation

  13. Improved specifications for continuous emission monitoring

    International Nuclear Information System (INIS)

    Dene, C.E.; Eggleston, T.E.; Gray, W.C. Jr.; Bisha, R.M.

    1988-01-01

    Continuous emission monitoring (CEM) in the electric utility industry historically has been plagued by poor performance and inconsistent system reliability. These problems have, in part, been caused by the complexity and diversity of the various systems available, and the dissimilarity of continuous emission monitors CEMs relative to conventional power plant instrumentation. Recognizing the problems faced by the utility industry in implementing CEM programs, the Electric Power Research Institute (EPRI) initiated a multi-phase project to define the current state of technology for CEMs and to provide a comprehensive guide for the purchase and installation of a CEM system. The second phase of this project was the application of these guidelines to the actual purchase, installation, and operation of a CEM system for an electric utility generating station. Through this application of the guidelines it has been possible to determine further research needs and areas of the manual which require clarification or enhancement. This paper describes the development of the guidelines and modifications to the guidelines, and discusses EPRI's plans for future activities in the area of continuous emission monitoring

  14. Operability test procedure for the TK-900 effluent monitoring station

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    This procedure will verify that the 221-B liquid effluent monitoring system, installed near the east end of the 6-in. chemical sewer header, functions as intended by design. TK-900B was installed near stairwell 3 in the 221-B electrical gallery by Project W-007H. The system is part of BAT/AKART for the BCE liquid effluent system

  15. A Mock UF6 Feed and Withdrawal System for Testing Safeguards Monitoring Systems and Strategies Intended for Nuclear Fuel Enrichment and Processing Plants

    International Nuclear Information System (INIS)

    Krichinsky, Alan M.; Bates, Bruce E.; Chesser, Joel B.; Koo, Sinsze; Whitaker, J. Michael

    2009-01-01

    This report describes an engineering-scale, mock UF6 feed and withdrawal (F and W) system, its operation, and its intended uses. This system has been assembled to provide a test bed for evaluating and demonstrating new methodologies that can be used in remote, unattended, continuous monitoring of nuclear material process operations. These measures are being investigated to provide independent inspectors improved assurance that operations are being conducted within declared parameters, and to increase the overall effectiveness of safeguarding nuclear material. Testing applicable technologies on a mock F and W system, which uses water as a surrogate for UF6, enables thorough and cost-effective investigation of hardware, software, and operational strategies before their direct installation in an industrial nuclear material processing environment. Electronic scales used for continuous load-cell monitoring also are described as part of the basic mock F and W system description. Continuous monitoring components on the mock F and W system are linked to a data aggregation computer by a local network, which also is depicted. Data collection and storage systems are described only briefly in this report. The mock UF 6 F and W system is economical to operate. It uses a simple process involving only a surge tank between feed tanks and product and withdrawal (or waste) tanks. The system uses water as the transfer fluid, thereby avoiding the use of hazardous UF 6 . The system is not tethered to an operating industrial process involving nuclear materials, thereby allowing scenarios (e.g., material diversion) that cannot be conducted otherwise. These features facilitate conducting experiments that yield meaningful results with a minimum of expenditure and quick turnaround time. Technologies demonstrated on the engineering-scale system lead to field trials (described briefly in this report) for determining implementation issues and performance of the monitoring technologies under

  16. Airborne Wireless Sensor Networks for Airplane Monitoring System

    Directory of Open Access Journals (Sweden)

    Shang Gao

    2018-01-01

    Full Text Available In traditional airplane monitoring system (AMS, data sensed from strain, vibration, ultrasound of structures or temperature, and humidity in cabin environment are transmitted to central data repository via wires. However, drawbacks still exist in wired AMS such as expensive installation and maintenance, and complicated wired connections. In recent years, accumulating interest has been drawn to performing AMS via airborne wireless sensor network (AWSN system with the advantages of flexibility, low cost, and easy deployment. In this review, we present an overview of AMS and AWSN and demonstrate the requirements of AWSN for AMS particularly. Furthermore, existing wireless hardware prototypes and network communication schemes of AWSN are investigated according to these requirements. This paper will improve the understanding of how the AWSN design under AMS acquires sensor data accurately and carries out network communication efficiently, providing insights into prognostics and health management (PHM for AMS in future.

  17. Looking beyond installation: Why households struggle to make the most of solar hot water systems

    International Nuclear Information System (INIS)

    Gill, Nicholas; Osman, Peter; Head, Lesley; Voyer, Michelle; Harada, Theresa; Waitt, Gordon; Gibson, Chris

    2015-01-01

    This paper examines household responses to sustainability issues and adoption of energy saving technologies. Our example of solar hot water systems highlights the complexity and variability of responses to low-carbon technologies. While SHW systems have the potential to provide the majority of household hot water and to lower carbon emissions, little research has been done to investigate how SHW systems are integrated into everyday life. We draw on cultural understandings of the household to identify passive and active users of SHW systems and utilize a model that illustrates how technology use is dependent on inter-relations between cultural norms, systems of provision, the material elements of homes, and practice. A key finding is that households can be ill-prepared to make the most of their SHW systems and lack post-installation support to do so. Thus, informed and efficient use of SHW systems is hit and miss. Current policy is largely aimed at subsidizing purchase and installation on the assumption that this is sufficient for emission reduction goals. Our analysis provides evidence to the contrary. Areas we highlight for policy and practice improvement are independent pre-purchase advice, installation quality, and practical guidance on system operation and interaction with patterns of hot water use. - Highlights: • We interview Australian households about their experience with SHW systems. • We identify active and passive users of SHW. Active users tend to be dissatisfied with their system. • Passive users tend to be satisfied but have relatively inefficient systems. • Householders struggle to integrate hot water use and system operation, compromising efficiency. • Policy should encompass pre and post-installation support as much as incentives to install.

  18. Integrated online condition monitoring system for nuclear power plants

    International Nuclear Information System (INIS)

    Hashemian, Hashem M.

    2010-01-01

    Online condition monitoring or online monitoring (OLM) uses data acquired while a nuclear power is operating to continuously assess the health of the plant's sensors, processes, and equipment; to measure the dynamic performance of the plant's process instrumentation; to verify in-situ the calibration of the process instrumentation; to detect blockages, voids, and leaks in the pressure sensing lines; to identify core flow anomalies; to extend the life of neutron detectors and other sensors; and to measure the vibration of reactor internals. Both the steady-state or DC output of plant sensors and their AC signal or noise output can be used to assess sensor health, depending on whether the application is monitoring a rapidly changing (e.g., core barrel motion) or a slowly changing (e.g., sensor calibration) process. The author has designed, developed, installed, and tested OLM systems (comprised of software/hardware-based data acquisition and data processing modules) that integrate low-frequency (1 mHz to 1 Hz) techniques such as RTD cross-calibration, pressure transmitter calibration monitoring, and equipment condition monitoring and high-frequency (1 Hz to 1 kHz) techniques such as the noise analysis technique. The author has demonstrated the noise analysis technique's effectiveness for measuring the dynamic response-time of pressure transmitters and their sensing lines; for performing predictive maintenance on reactor internals; for detecting core flow anomalies; and for extending neutron detector life. Integrated online condition monitoring systems can combine AC and DC data acquisition and signal processing techniques, can use data from existing process sensors during all modes of plant operation, including startup, normal operation, and shutdown; can be retrofitted into existing PWRs, BWRs, and other reactor types and will be integrated into next-generation plants. (orig.)

  19. Integrated online condition monitoring system for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hashemian, Hashem M. [Analysis and Measurement Services Corporation, Knoxville, TN (United States). AMS Technology Center

    2010-09-15

    Online condition monitoring or online monitoring (OLM) uses data acquired while a nuclear power is operating to continuously assess the health of the plant's sensors, processes, and equipment; to measure the dynamic performance of the plant's process instrumentation; to verify in-situ the calibration of the process instrumentation; to detect blockages, voids, and leaks in the pressure sensing lines; to identify core flow anomalies; to extend the life of neutron detectors and other sensors; and to measure the vibration of reactor internals. Both the steady-state or DC output of plant sensors and their AC signal or noise output can be used to assess sensor health, depending on whether the application is monitoring a rapidly changing (e.g., core barrel motion) or a slowly changing (e.g., sensor calibration) process. The author has designed, developed, installed, and tested OLM systems (comprised of software/hardware-based data acquisition and data processing modules) that integrate low-frequency (1 mHz to 1 Hz) techniques such as RTD cross-calibration, pressure transmitter calibration monitoring, and equipment condition monitoring and high-frequency (1 Hz to 1 kHz) techniques such as the noise analysis technique. The author has demonstrated the noise analysis technique's effectiveness for measuring the dynamic response-time of pressure transmitters and their sensing lines; for performing predictive maintenance on reactor internals; for detecting core flow anomalies; and for extending neutron detector life. Integrated online condition monitoring systems can combine AC and DC data acquisition and signal processing techniques, can use data from existing process sensors during all modes of plant operation, including startup, normal operation, and shutdown; can be retrofitted into existing PWRs, BWRs, and other reactor types and will be integrated into next-generation plants. (orig.)

  20. Solar heating system installed at Jackson, Tennessee. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

  1. Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems Using a Bottom-Up Approach and Installer Survey

    Energy Technology Data Exchange (ETDEWEB)

    Ardani, Kristen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Feldman, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ong, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-11-01

    This report presents results from the first U.S. Department of Energy (DOE) sponsored, bottom-up data-collection and analysis of non-hardware balance-of-system costs—often referred to as “business process” or “soft” costs—for residential and commercial photovoltaic (PV) systems. Annual expenditure and labor-hour-productivity data are analyzed to benchmark 2010 soft costs related to the DOE priority areas of (1) customer acquisition; (2) permitting, inspection, and interconnection; (3) installation labor; and (4) installer labor for arranging third-party financing. Annual expenditure and labor-hour data were collected from 87 PV installers. After eliminating outliers, the survey sample consists of 75 installers, representing approximately 13% of all residential PV installations and 4% of all commercial installations added in 2010. Including assumed permitting fees, in 2010 the average soft costs benchmarked in this analysis total $1.50/W for residential systems (ranging from $0.66/W to $1.66/W between the 20th and 80th percentiles). For commercial systems, the median 2010 benchmarked soft costs (including assumed permitting fees) are $0.99/W for systems smaller than 250 kW (ranging from $0.51/W to $1.45/W between the 20th and 80th percentiles) and $0.25/W for systems larger than 250 kW (ranging from $0.17/W to $0.78/W between the 20th and 80th percentiles). Additional soft costs not benchmarked in the present analysis (e.g., installer profit, overhead, financing, and contracting) are significant and would add to these figures. The survey results provide a benchmark for measuring—and helping to accelerate—progress over the next decade toward achieving the DOE SunShot Initiative’s soft-cost-reduction targets. We conclude that the selected non-hardware business processes add considerable cost to U.S. PV systems, constituting 23% of residential PV system price, 17% of small commercial system price, and 5% of large commercial system price (in 2010

  2. ER Operations Installation of Three FLUTe Soil-Vapor Monitoring Wells (MWL-SV03 MWL-SV04 and MWL-SV05) at the Mixed Waste Landfill.

    Energy Technology Data Exchange (ETDEWEB)

    Copland, John Robin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-09-01

    This installation report describes the May through July 2014 drilling activities performed for the installation of three multi-port soil-vapor monitoring wells (MWL-SV03, MWL-SV04, and MWL-SV05) at the Mixed Waste Landfill (MWL), which is located at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy (DOE)/National Nuclear Security Administration. The MWL is designated as Solid Waste Management Unit (SWMU) 76 and is located in Technical Area (TA) III (Figure 1-1). The locations of the three soil-vapor monitoring wells (MWL-SV03, MWL-SV04, and MWL-SV05) are shown in Figure 1-2

  3. Computational model for real-time determination of tritium inventory in a detritiation installation

    International Nuclear Information System (INIS)

    Bornea, Anisia; Stefanescu, Ioan; Zamfirache, Marius; Stefan, Iuliana; Sofalca, Nicolae; Bidica, Nicolae

    2008-01-01

    Full text: At ICIT Rm.Valcea an experimental pilot plant was built having as main objective the development of a technology for detritiation of heavy water processed in the CANDU-type reactors of the nuclear power plant at Cernavoda, Romania. The aspects related to safeguards and safety for such a detritiation installation being of great importance, a complex computational model has been developed. The model allows real-time calculation of tritium inventory in a working installation. The applied detritiation technology is catalyzed isotopic exchange coupled with cryogenic distillation. Computational models for non-steady working conditions have been developed for each process of isotopic exchange. By coupling these processes tritium inventory can be determined in real-time. The computational model was developed based on the experience gained on the pilot installation. The model uses a set of parameters specific to isotopic exchange processes. These parameters were experimentally determined in the pilot installation. The model is included in the monitoring system and uses as input data the parameters acquired in real-time from automation system of the pilot installation. A friendly interface has been created to visualize the final results as data or graphs. (authors)

  4. Monitoring Cray Cooling Systems

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, Don E [ORNL; Ezell, Matthew A [ORNL; Becklehimer, Jeff [Cray, Inc.; Donovan, Matthew J [ORNL; Layton, Christopher C [ORNL

    2014-01-01

    While sites generally have systems in place to monitor the health of Cray computers themselves, often the cooling systems are ignored until a computer failure requires investigation into the source of the failure. The Liebert XDP units used to cool the Cray XE/XK models as well as the Cray proprietary cooling system used for the Cray XC30 models provide data useful for health monitoring. Unfortunately, this valuable information is often available only to custom solutions not accessible by a center-wide monitoring system or is simply ignored entirely. In this paper, methods and tools used to harvest the monitoring data available are discussed, and the implementation needed to integrate the data into a center-wide monitoring system at the Oak Ridge National Laboratory is provided.

  5. Argonne National Laboratory's photo-oxidation organic mixed waste treatment system - installation and startup testing

    International Nuclear Information System (INIS)

    Shearer, T.L.; Nelson, R.A.; Torres, T.; Conner, C.; Wygmans, D.

    1997-01-01

    This paper describes the installation and startup testing of the Argonne National Laboratory (ANL-E) Photo-Oxidation Organic Mixed Waste Treatment System. This system will treat organic mixed (i.e., radioactive and hazardous) waste by oxidizing the organics to carbon dioxide and inorganic salts in an aqueous media. The residue will be treated in the existing radwaste evaporators. The system is installed in the Waste Management Facility at the ANL-E site in Argonne, Illinois. 1 fig

  6. Calibration of the beam-position monitor system for the SLAC PEP-II B factory

    International Nuclear Information System (INIS)

    Johnson, R.; Smith, S.; Kurita, N.

    1997-06-01

    The Beam-Position Monitors (BPM) for the PEP-II B Factory consist of four 1.5-cm diameter button style pickups mounted on the diagonals of the quadrupole vacuum chambers. Before installation of the vacuum chambers in the quadrupole assemblies, the electrical center of the BPMs is measured with respect to the mechanical center in a calibration test stand. In this paper the calibration test stand is described and the precision and accuracy of the calibrations are presented. After installation of the quadrupole assemblies in the PEP-II tunnel, the passive attenuation for each channel of the system is measured to preserve the accuracy of the calibration. Finally, the active electronics includes an onboard calibrator. Results for these portions of the calibration are presented

  7. Service life monitoring of the main components at the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Hahn, J.; Vincour, D.

    2007-01-01

    Knowledge and experience gained from the introduction and periodical implementation of life assessment of the major components of the Temelin nuclear power plant is summarized. The initial Soviet technical design of the plant did not incorporate lifetime monitoring and evaluation, therefore it was completed with demonstrative strength and lifetime calculations from Czech companies. Moreover, a Westinghouse primary circuit diagnosis and monitoring system, including the monitoring of temperature and pressure cycles for low-cycle fatigue evaluation, was installed at the plant. The DIALIFE code for the calculation of mainly the low-cycle fatigue of the key pressure components, was developed and installed subsequently as a superstructure to the monitoring system. (author)

  8. Acceptance test procedure for the ultra high pressure bore head for use in the self-installing liquid observation well

    International Nuclear Information System (INIS)

    Hertelendy, N.A.

    1995-01-01

    In order to monitor waste stored in single-shell tanks, liquid observation wells (LOWs) are installed to permit periodic insertion of instrumentation probes to evaluate the waste cross sections. An ultra high pressure water bore head, developed for installing instrument trees, was adapted for use with the LOWs. The modification facilitates the removal of the high pressure water feed system after installation. This document describes a series of tests that ensures that the design meets all the functional requirements

  9. Engineering Task Plan for the 241-AN-105 Multi-Function Corrosion Monitoring System

    International Nuclear Information System (INIS)

    EDGEMON, G.L.

    1999-01-01

    This Engineering Task Plan (ETP) describes the activities associated with the installation of the corrosion probe assembly into riser WST-RISER-016 (formerly 15B) of tank 241-AN-105. The corrosion monitoring system utilizes the technique of electrochemical noise (EN) for monitoring waste tank corrosion. Typically, EN consists of low frequency (4 Hz) and small amplitude signals that are spontaneously generated by electrochemical reactions occurring at corroding or other surfaces. EN analysis is well suited for monitoring and identifying the onset of localized corrosion, and for measuring uniform corrosion rates. A typical EN based corrosion-monitoring system measures instantaneous fluctuations in corrosion current and potential between three nominally identical electrodes of the material of interest immersed in the environment of interest. Time-dependent fluctuations in corrosion current are described by electrochemical current noise, and time-dependent fluctuations of corrosion potential are described by electrochemical noise. The corrosion monitoring system is designed to detect the onset of localized corrosion phenomena if tank conditions should change to allow these phenomena to occur. In addition to the EN technique, the system also facilitates the use of the Linear Polarization Resistance (LPR) technique to collect uniform corrosion rate information. LPR measures the linearity at the origin of the polarization curve for overvoltages up to a few millivolts away from the rest potential or natural corrosion potential. The slope of the current vs. voltage plot gives information on uniform corrosion rates

  10. Proposal for the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC. Following a market survey carried out among 53 firms in twelve Member States, a call for tenders (IT-3091/TIS/LHC) was sent on 17 July 2003 to seven firms and five consortia in eight Member States. By the closing date, CERN had received seven tenders from one firm and six consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ASSYSTEM INDUSTRIAL SERVICES (FR) - GENITRON INSTRUMENTS (DE), the lowest bidder, for the supply, installation and maintenance of radiation and environmental monitoring for the LHC for a total amount not exceeding 5 474 000 euros (8 457 000 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender. The consortium has indicated the following distribution by country of the contract value covered by this ...

  11. High-Resolution Gas Metering and Nonintrusive Appliance Load Monitoring System

    Science.gov (United States)

    Tewolde, Mahder

    This thesis deals with design and implementation of a high-resolution metering system for residential natural gas meters. Detailed experimental measurements are performed on the meter to characterize and understand its measurement properties. Results from these experiments are used to develop a simple, fast and accurate technique to non-intrusively monitor the gas consumption of individual appliances in homes by resolving small amounts of gas usage. The technique is applied on an existing meter retrofitted with a module that includes a high-resolution encoder to collect gas flow data and a microprocessor to analyze and identify appliance load profiles. This approach provides a number of appealing features including low cost, easy installation and integration with automated meter reading (AMR) systems. The application of this method to residential gas meters currently deployed is also given. This is done by performing a load simulation on realistic gas loads with the aim of identifying the necessary parameters that minimize the cost and complexity of the mechanical encoder module. The primary benefits of the system are efficiency analysis, appliance health monitoring and real-time customer feedback of gas usage. Additional benefits of include the ability to detect very small leaks and theft. This system has the potential for wide scale market adoption.

  12. Experience with the TUeV pipe monitoring system at the Grohnde nuclear power station

    International Nuclear Information System (INIS)

    Dittmar, H.; Hofstoetter, P.

    1995-01-01

    A special pipe monitoring system has been developed by TUeV Rheinland during the construction, commissioning and operation of the Grohnde nuclear power station. On the basis of measurements during construction and commissioning a basic monitoring system has been developed, using not only a system of sophisticated sensors that had been permanently installed from the beginning but also a large number of quite simple additional sensors. Measurements were taken before, during and after inspections and led to the discovery of unexpected and high stresses during service as well as to long-term changes over a period of years.Special measurements were taken with high temperature strain gauges and thermocouples to identify problems such as temperature layering. A special on-line measuring device was developed and used for the continuous monitoring of temperatures during operation.All these measurements help to identify out areas with high stresses or service conditions giving rise to high loads, in order on the one hand to prevent damage and on the other hand to prove that the pipes are functioning within their design parameters without problems. ((orig.))

  13. Design of a continuous emissions monitoring system at a manufacturing facility recycling hazardous waste

    International Nuclear Information System (INIS)

    Harlow, G.; Bartman, C.D.; Renfroe, J.

    1991-01-01

    In March 1988, Marine Shale Processors, Inc. (MSP) initiated a project to incorporate a continuous emissions monitoring system (CEMS) at its manufacturing facility in Amelia, Louisiana, which recycles hazardous material into light-weight, general purpose aggregate. The stimuli for the project were: To quantify stack gas emissions for the purpose of risk assessment; To use the data generated for process control and evaluation purposes; and, MSP's commitment to advance the science of continuous monitoring of stack gas emissions. In order to successfully respond to these goals, MSP sought a system which could monitor combustion products such as NOx, SO 2 , HCl and CO 2 , as well as speciated organic compounds. Several analytical technologies and sampling system designs were reviewed to determine the best fit to satisfy the requirements. A process mass spectrometer and a heated sample extraction subsystem were selected for the project. The purpose of this paper is to review the available analytical technologies for CEMS and sample extraction subsystems and to describe the CEMS now installed at MSP

  14. Impact of PID on industrial rooftop PV-installations

    Science.gov (United States)

    Buerhop, Claudia; Fecher, Frank W.; Pickel, Tobias; Patel, Tirth; Zetzmann, Cornelia; Camus, Christian; Hauch, Jens; Brabec, Christoph J.

    2017-08-01

    Potential induced degradation (PID) causes severe damage and financial losses even in modern PV-installations. In Germany, approximately 19% of PV-installations suffer from PID and resulting power loss. This paper focuses on the impact of PID in real installations and how different evaluated time intervals influence the performance ratio (PR) and the determined degradation rate. The analysis focuses exemplarily on a 314 kWp PV-system in the Atlantic coastal climate. IR-imaging is used for identifying PID without operation interruption. Historic electric performance data are available from a monitoring system for several years on system level, string level as well as punctually measured module string IV- curves. The data sets are combined for understanding the PID behavior of this PV plant. The number of PID affected cells within a string varies strongly between 1 to 22% with the string position on the building complex. With increasing number of PID-affected cells the performance ratio decreases down to 60% for daily and monthly periods. Local differences in PID evolution rates are identified. An average PR-reduction of -3.65% per year is found for the PV-plant. On the string level the degradation rate varied up to 8.8% per year depending on the string position and the time period. The analysis reveals that PID generation and evolution in roof-top installations on industrial buildings with locally varying operation conditions can be fairly complex. The results yield that local operating conditions, e.g. ambient weather conditions as well as surrounding conditions on an industrial building, seem to have a dominating impact on the PID evolution rate.

  15. Monitoring and energetic performance of two similar semi-closed greenhouse ventilation systems

    International Nuclear Information System (INIS)

    Coomans, Mathias; Allaerts, Koen; Wittemans, Lieve; Pinxteren, Dave

    2013-01-01

    Highlights: • Measurements on two semi-closed greenhouses and two traditional open greenhouses. • Mechanical and natural ventilation for dehumidification and cooling. • Analyses and comparison of installation controls, indoor climate and energy flows. • Examination of air-to-air heat recuperation efficiency in ventilation unit. • Using the semi-closed systems amounted to energy savings of 13% and 28%. - Abstract: Horticulture is an energy intensive industry when dealing with cold climates such as Western Europe. High energy prices and on-going pressure from international competition are raising demand for energy efficient solutions. In search of reducing greenhouse energy consumption, this study investigates semi-closed systems combining controlled mechanical and natural ventilation with thermal screens. Ventilated greenhouse systems (semi-closed) have been implemented in the greenhouse compartments of two Belgian horticulture research facilities: the Research Station for Vegetable Production Sint-Katelijne-Waver (PSKW) and the Research Center Hoogstraten (PCH). Additionally, two reference compartments were included for comparison of the results. The greenhouses were part of a long-term monitoring campaign in which detailed measurements with a high time resolution were gathered by a central monitoring system. A large amount of data was processed and analysed, including outdoor and indoor climatic parameters, system controls and installation measurements. The ventilated greenhouses obtained energy savings of 13% and 28% for PSKW and PCH respectively, without substantial impact on crop production or indoor climate conditions when compared to the reference compartments. A considerable amount of heat was recovered by the heat recuperation stage in the ventilation unit of PCH, accounting for 12% of the total heat demand. In general, it was demonstrated that the greenhouse heat demand can be reduced significantly by controlled dehumidification with mechanical

  16. Design and installation of high-temperature ultrasonic measuring system and grinder for nuclear fuel containing trans-uranium elements

    International Nuclear Information System (INIS)

    Serizawa, Hiroyuki; Kikuchi, Hironobu; Iwai, Takashi; Arai, Yasuo; Kurosawa, Makoto; Mimura, Hideaki; Abe, Jiro

    2005-07-01

    A high-temperature ultrasonic measuring system had been designed and installed in a glovebox (711-DGB) to study a mechanical property of nuclear fuel containing trans-uranium (TRU) elements. A figuration apparatus for the cylinder-type sample preparation had also been modified and installed in an established glovebox (142-D). The system consists of an ultrasonic probe, a heating furnace, cooling water-circulating system, a cooling air compressor, vacuum system, gas supplying system and control system. An A/D converter board and an pulsar/receiver board for the measurement of wave velocity were installed in a personal computer. The apparatus was modified to install into the glovebox. Some safety functions were supplied to the control system. The shape and size of the sample was revised to minimize the amount of TRU elements for the use of the measurement. The maximum sample temperature is 1500degC. The performance of the installed apparatuses and the glovebox were confirmed through a series of tests. (author)

  17. COCONet enhancements to circum-Caribbean tsunami warning, tidal, and sea-level monitoring: update on tide gauge installations

    Science.gov (United States)

    Dausz, K.; Dittmann, S. T.; Feaux, K.; von Hillebrandt-Andrade, C.; Mattioli, G. S.; Normandeau, J.

    2014-12-01

    The Continually Operating Caribbean GPS Observational Network (COCONet) is a National Science Foundation (NSF) funded multi-hazard geodetic and meteorological network distributed throughout the Caribbean, which provides infrastructure and capacity building for a broad range of earth science questions. The network is a multi-national collaboration consisting of 46 newly constructed continuous Global Positioning Systems (cGPS) and 21 refurbished existing GPS stations, all co-located with meteorological sensors. One recommendation of the COCONet working group was to improve the vertical reference frame for long-term sea level monitoring. A COCONet supplement was awarded by the NSF to further address this particular objective through the co-location of GPS and tide gauges. This COCOnet infrastructure, along with the new tide gauges, will have broad scientific implications for hazards mitigation, solid earth, and atmospheric science research. UNAVCO engineers have meet with members of the Caribbean tide gauge community to establish target locations and design station layout. Allocated NSF funds allow for the construction of two complete new tide gauge systems each with two complimentary cGPS. Following the recommendations of NOAA and the sea level monitoring community, the two "new" locales will be Port Royal, Jamaica and Puerto Morelos, Mexico. Both locations had previously existing, but currently non-operational tide gauges. UNAVCO engineers will install a Sutron Radar Level Recorder and a backup pressure sensor tide gauge with GOES satellite telemetry. Tide data will be freely available by the Intergovernmental Oceanographic Commission (www.ioc-sealevelmonitoring.org). The NSF supplement also provided funds for adding cGPS to two additional locations where currently functioning tide gauge systems exist. Proposed locations for this additional infrastructure are Barahona, Dominican Republic and Bocas del Toro, Panama. All four locations will feature two standard

  18. Event-synchronized data acquisition system for the SPring-8 linac beam position monitors

    Science.gov (United States)

    Masuda, T.; Fukui, T.; Tanaka, R.; Taniuchi, T.; Yamashita, A.; Yanagida, K.

    2005-05-01

    By the summer of 2003, we had completed the installation of a new non-destructive beam position monitor (BPM) system to facilitate beam trajectory and energy correction for the SPring-8 linac. In all, 47 BPM sets were installed on the 1-GeV linac and three beam-transport lines. All of the BPM data acquisition system was required to operate synchronously with the electron beam acceleration cycle. We have developed an event-synchronized data acquisition system for the BPM data readout. We have succeeded in continuously taking all the BPMs data from six VME computers synchronized with the 10 pps operation of the linac to continuously acquire data. For each beam shot, the data points are indexed by event number and stored in a database. Using the real-time features of the Solaris operating system and distributed database technology, we currently have achieved about 99.9% efficiency in capturing and archiving all of the 10 Hz data. The linac BPM data is available for off-line analysis of the beam trajectory, but also for real-time control and automatic correction of the beam trajectory and energy.

  19. Remote Monitoring of Near-Surface Soil Moisture Dynamics In Unstable Slopes Using a Low-Power Autonomous Resistivity Imaging System

    Science.gov (United States)

    Chambers, J. E.; Meldrum, P.; Gunn, D.; Wilkinson, P. B.; Uhlemann, S.; Swift, R. T.; Kuras, O.; Inauen, C.; Hutchinson, D.; Butler, S.

    2016-12-01

    ERT monitoring has been demonstrated in numerous studies as an effective means of imaging near surface processes for applications as diverse as permafrost studies and contaminated land assessment. A limiting factor in applying time-lapse ERT for long-term studies in remote locations has been the availability of cost-effective ERT measurement systems designed specifically for monitoring applications. Typically, monitoring is undertaken using repeated manual data collection, or by building conventional survey instruments into a monitoring setup. The latter often requires high power and is therefore difficult to operate remotely without access to mains electricity. We describe the development of a low-power resistivity imaging system designed specifically for remote monitoring, taking advantage of, e.g., solar power and data telemetry. Here, we present the results of two field deployments. The system has been installed on an active railway cutting to provide insights into the effect of vegetation on the moisture dynamics in unstable infrastructure slopes and to gather subsurface information for pro-active remediation measures. The system, comprising 255 electrodes, acquires 4596 reciprocal measurement pairs twice daily during standard operation. In case of severe weather events, the measurement schedule is reactively changed, to gather high temporal resolution data to image rainfall infiltration processes. The system has also been installed along a leaking and marginally stable canal embankment; a less favourable location for remote monitoring, with limited solar power and poor mobile reception. Nevertheless, the acquired data indicated the effectiveness of remedial actions on the canal. The ERT results showed that one leak was caused by the canal and fixed during remediation, while two other "leaks" were shown to be effects of groundwater dynamics. The availability of cost-effective, low-power ERT monitoring instrumentation, combined with an automated workflow of

  20. Installation and Commissioning of the Helium Refrigeration System for the HANARO-CNS

    International Nuclear Information System (INIS)

    Choi, Jung Woon; Kim, Young Ki; Wu, Sang Ik; Son, Woo Jung

    2009-11-01

    The cold neutron source (CNS), which will be installed in the vertical CN hole of the reflector tank at HANARO, makes thermal neutrons to moderate into the cold neutrons with the ranges of 0.1 ∼ 10 meV passing through a moderator at about 22K. A moderator to produce cold neutrons is liquid hydrogen, which liquefies by the heat transfer with cryogenic helium flowing from the helium refrigeration system. For the maintenance of liquid hydrogen in the IPA, the CNS system is mainly consisted of the hydrogen system to supply the hydrogen to the IPA, the vacuum system to keep the cryogenic liquid hydrogen in the IPA, and the helium refrigeration system to liquefy the hydrogen gas. The helium refrigeration system can be divided into two sections: one is the helium compression part from the low pressure gas to the high pressure gas and the other is the helium expansion part from the high temperature gas and pressure to low temperature and pressure gas by the expansion turbine. The helium refrigeration system except the warm helium pipe and the helium buffer tank has been manufactured by Linde Kryotechnik, AG in Switzerland and installed in the research reactor hall, HANARO. Other components have been manufactured in the domestic company. This technical report deals with the issues, its solutions, and other particular points while the helium refrigeration system was installed at site, verified its performance, and conducted its commissioning along the reactor operation. Furthermore, the operation procedure of the helium refrigeration system is included in here for the normal operation of the CNS

  1. The Development of a Proper Laser Displacement Monitoring System for Medium and Short Span Bridges

    Directory of Open Access Journals (Sweden)

    Hao Tian

    2014-09-01

    Full Text Available The Health Monitoring System (HMS for a Medium and Short Span (MSS bridge is different to one for a long span bridge, because of factors such assize, scale and importance. Therefore a proper HMS needs to be developed to meet the economic and applicability requirements of the large number of MSS bridges. Approximately 90 % of existing bridges in China are categorized as MSS bridges and most are beginning to deteriorate. Furthermore, there is not a suitable HMS that can assess the condition of the bridge in accordance with a growth market where traffic volumes are likely to increase. Indeed, the artificial patrolling system currently in use is unable to monitor bridges in the long-term and highlight problems within a sufficient time scale. Having discussed the necessity of a HMS for MSS bridges, this paper proposes a suitable system that uses displacement monitoring in addition to the necessary precision. Displacement was chosen as the main monitoring indicator for intuitive, convenient and direct viewing, as its critical characteristic is that it is both economical and straightforward to use. Specific details regarding the laser displacement sensor and the development of a wireless data acquisition and transmission system are also provided. The reliability of the displacement monitoring sensor and data processing system is confirmed through different stages of an installation test.

  2. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  3. Evaluating penetration-monitoring systems

    International Nuclear Information System (INIS)

    Markin, J.T.

    1981-01-01

    Evaluating the performance of a process monitoring system in detecting improper activities that could be related to material diversion requires a framework for addressing the complexity and statistical uncertainty of such systems. This report proposes a methodology that determines the optimal divertor strategy against a monitoring system and the system probability of detection. This method extends previous work by correctly modeling uncorrelated and correlated measurement errors for radiation monitors

  4. The upgraded data acquisition system for beam loss monitoring at the Fermilab Tevatron and Main Injector

    International Nuclear Information System (INIS)

    Baumbaugh, A.; Briegel, C.; Brown, B.C.; Capista, D.; Drennan, C.; Fellenz, B.; Knickerbocker, K.; Lewis, J.D.; Marchionni, A.; Needles, C.; Olson, M.

    2011-01-01

    A VME-based data acquisition system for beam-loss monitors has been developed and is in use in the Tevatron and Main Injector accelerators at the Fermilab complex. The need for enhanced beam-loss protection when the Tevatron is operating in collider-mode was the main driving force for the new design. Prior to the implementation of the present system, the beam-loss monitor system was disabled during collider operation and protection of the Tevatron magnets relied on the quench protection system. The new Beam-Loss Monitor system allows appropriate abort logic and thresholds to be set over the full set of collider operating conditions. The system also records a history of beam-loss data prior to a beam-abort event for post-abort analysis. Installation of the Main Injector system occurred in the fall of 2006 and the Tevatron system in the summer of 2007. Both systems were fully operation by the summer of 2008. In this paper we report on the overall system design, provide a description of its normal operation, and show a number of examples of its use in both the Main Injector and Tevatron.

  5. 40 CFR 63.4568 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Science.gov (United States)

    2010-07-01

    ... direction indicator must be installed in each bypass line or air makeup supply line that could divert the... via relative accuracy testing. (vi) Perform leak checks monthly. (vii) Perform visual inspections of... accuracy of at least 0.5 inches of water column or 5 percent of the measured value, whichever is larger...

  6. E4 - Energy efficient elevators and escalators. Monitoring campaign - Germany

    Energy Technology Data Exchange (ETDEWEB)

    Hirzel, Simon; Boege, Christian

    2009-12-15

    A monitoring campaign was carried out within the E4 project as a contribution to improving the understanding of energy consumption and energy efficiency of elevators and escalators in Europe. The aim of this campaign is to broaden the empirical base on the energy consumption of elevators and escalators, to provide publicly available monitoring data and to find hints on system configurations using little energy. Originally, 50 installations were planned to be monitored within the project. In the end, 74 elevators and 7 escalators, i.e. a total of 81 installations, were analyzed in the four countries under study: Portugal, Poland, Italy and Germany. The aim of this document is to summarize the results of the German monitoring campaign with its 14 installations (13 elevators, 1 escalator) and to provide interested readers with some additional information on the campaign. This document has six parts: Second, after the introductory section, some general information on the monitoring methodology is provided as a background for understanding and interpreting the subsequent results. In the third part, information on the monitored elevator installations and their characteristics is given. Part four is concerned with presenting and discussing the results of the monitoring campaign for the elevators while part five shortly presents the results for the monitored escalator. Finally, some conclusions are found in the last part. (orig.)

  7. Tracking the Sun 10: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naim R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); LaCommare, Kristina [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); DiSanti, Nicholas [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States)

    2017-09-21

    Berkeley Lab’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected, residential and non-residential systems solar photovoltaic (PV) systems in the United States. The present report, the tenth edition in the series, focuses on systems installed through year-end 2016, with preliminary data for the first half of 2017. The report provides an overview of both long-term and more-recent trends, highlighting key drivers for installed price declines over different time horizons. The report also extensively characterizes the widespread variability in system pricing, comparing installed prices across states, market segments, installers, and various system and technology characteristics. The trends described in this report derive from project-level data collected by state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. In total, data for this report were compiled and cleaned for more than 1.1 million individual PV systems, though the analysis in the report is based on a subset of that sample, consisting of roughly 630,000 systems with available installed price data. The full underlying dataset of project-level data (excluding any confidential information) is available in a public data file, for use by other researchers and analysts.

  8. Environmental radiation monitoring system

    International Nuclear Information System (INIS)

    Kato, Tsutomu; Shioiri, Masatoshi; Sakamaki, Tsuyoshi

    2007-01-01

    Environmental radiation monitoring systems are used to measure and monitoring gamma-rays at the observation boundaries of nuclear facilities and in the surrounding areas. In recent years, however, few new nuclear facilities have been constructed and the monitoring systems shift to renewal of existing systems. In addition, in order to increase public acceptance, the facilities are being equipped with communication lines to provide data to prefectural environmental centers. In this text, we introduce the latest technology incorporated in replacement of environmental radiation monitoring systems. We also introduce a replacement method that can shorten the duration during which environmental dose rate measurement is interrupted by enabling both the replacement system and the system being replaced to perform measurements in parallel immediately before and after the replacement. (author)

  9. Reactor inventory monitoring system for Angra-1 reactor; Sistema de monitoracao de inventario do reator para usina nuclear Angra I

    Energy Technology Data Exchange (ETDEWEB)

    S Neto, Joaquim A.; Silva, Marcos C.; Pinheiro, Ronaldo F.M. [Furnas Centrais Eletricas S.A., Rio de Janeiro, RJ (Brazil); Soares, Milton [Instituto de Engenharia Nuclear (IEN), Rio de Janeiro, RJ (Brazil); Martinez, Aquilino; Comerlato, Cesar A.; Oliveira, Eugenio A. [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia. Lab. de Monitoracao de Processos

    1996-07-01

    This work describes the project of Reactor Inventory Monitoring System, which will be installed in Angra I Nuclear Power Plant. The inventory information is important to the operators take corrective actions in case of an incident that may cause a failure in the core cooling. (author)

  10. Solar, Install, Mount, Production, Labor, Equipment Balance of Systems

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Al-Haddad, Tristan [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Valdes, Francisco [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Caravati, Kevin [Georgia Tech Applied Research Corporation, Atlanta, GA (United States); Goodman, Joseph [Georgia Tech Applied Research Corporation, Atlanta, GA (United States)

    2015-08-27

    The GTRI led project team in partnership with the DOE, universities, and numerous industry leaders, have advanced the mission of the DOE EERE, the Solar Energy Technologies Program, and the SunShot Initiative by accelerating the research, development, and demonstration of solar PV technologies that provide Extreme Balance of Systems Cost Reductions (BOS-X). The research produced 132 design concepts, resulting in 19 invention disclosures, five patent applications, four 90% pre-commercial designs, and three licensed technologies. Technology practice rights were obtained by an industry partner, and a new solar commercial start-up company was launched in Atlanta as a result of this project. Innovations in residential, commercial, and utility scale balance of systems technologies were realized through an unprecedented multi-disciplinary university/industry partnership with over 50 students and 24 faculty members that produced 18 technical publications, a PhD thesis, and two commercially deployed operating prototypes. The technical effectiveness and economic feasibility of the multidisciplinary systems based approach executed by the project team was realized through 1) a comprehensive evaluation of industry, regulatory, and public stakeholder requirements; 2) numerous industry/student/faculty engagements in design studios, technical conferences, and at solar PV installation sites; 3) time and motion studies with domain experts that provided technical data and costs for each phase and component of the solar PV installation processes; 4) extensive wind tunnel and systems engineering modeling; and 5) design, construction, and demonstration of the selected technologies in the field at high profile sites in Atlanta. The SIMPLE BOS project has benefitted the public in the following ways: • Workforce development: The launch of a start-up company to commercialize the DOE funded SIMPLE BoS designs has directly created 9 new jobs in the State of Georgia. As of November 2014, the

  11. Preparedness for response to the challenges from orphan sources: nationwide environmental radiation mapping with state of the art monitoring systems

    International Nuclear Information System (INIS)

    Saindane, Shashank S.; Pradeepkumar, K.S.; Suri, M.M.K.; Sharma, D.N.

    2008-01-01

    Based on the various international reports on orphan sources, the potential for radiological emergencies in public domain is recognized as a cause of concern. To detect the presence of any such orphan sources and to strengthen the preparedness for response to any radiological emergencies in public domain, a nationwide radiation mapping programme was initiated in India. Various radiation monitoring systems, few of them integrated with Global Positioning System (GPS) installed in mobile monitoring vans were used for this purpose. This monitoring also helped in generating the base line dose rate data of the cities and also in demonstrating the methodology of environmental monitoring for locating the presence of orphan sources, if any. During the detailed monitoring of various cities of the country, different systems such as GSM based Radiation Monitoring System (GRaMS), Compact Radiation Monitoring system, Portable Mobile Gamma Spectrometry System, Gamma Tracer System etc. installed in a vehicle were made to continuously acquire the data at a varying rate from 10 sec to 1 minute acquisition time. These systems can measure dose rate in the range of 0.01 - 100 μGy h -1 and can detect 7.4 MBq (200 μCi) of 60 Co and 25 MBq (675 μCi) of 137 Cs from a distance of 5 metre. Average dose rate recorded during these environmental monitoring was 81 ± 07 nGy h -1 with a maximum of 210 ± 11 nGyh -1 at Bangalore (attributed to the presence of K-40). The digital topographic map and the data acquired from the radiation mapping are used to generate terrestrial radiation map. This radiation profile stored in the database can be used as reference while carrying out the impact assessment following any nuclear / radiological emergencies. These systems also help to tag the radiation levels along with positional coordinates online onto the GIS map of the area. GRaMS also demonstrated its capability for online transmission of the data to the centralized data acquisition Base Station

  12. Lessons learned from a review of post-accident sampling systems, high range effluent monitors and high concentration particulate iodine samplers

    International Nuclear Information System (INIS)

    Hull, A.P.; Knox, W.H.; White, J.R.

    1987-01-01

    Post-accident sampling systems (PASS), high range gaseous effluent monitors and sampling systems for particulates and iodine in high concentrations have been reviewed at twenty-one licensee sites in Region I of the US Nuclear Regulatory Commission which includes fifteen BWR's and fourteen PWR's. Although most of the installed PASS met the criteria, the highest operational readiness was found in on-line systems that were also used for routine sampling and analysis. The detectors used in the gaseous effluent monitors included external ion chambers, GM tubes, organic scintillators and Cd-Te solid state crystals. Although all were found acceptable, each had its own inherent limitations in the conversion of detector output to the time varying concentration of a post-accident mixture of noble gases. None of the installed particulate and iodine samplers fully met all of the criteria. Their principal limitations included a lack of documentation showing that they could obtain a representative sample and that many of them would collect of an excessive amount of activity at the design criteria. 10 refs., 4 figs., 5 tabs

  13. The proposed monitoring system for the Fermilab D0 colliding beams detector

    Science.gov (United States)

    Goodwin, Robert; Florian, Robert; Johnson, Marvin; Jones, Alan; Shea, Mike

    1986-06-01

    The Fermilab D0 Detector is a collaborative effort that includes seventeen universities and national laboratories. The monitoring and control system for this detector will be separate from the online detector data system. A distributed, stand-alone, microprocessor-based system is being designed to allow monitoring and control functions to be available to the collaborators at their home institutions during the design, fabrication, and testing phases of the project. Individual stations are VMEbus-based 68000 systems that are networked together during installation using an ARCnet (by Datapoint Corporation) Local Area Network. One station, perhaps a MicroVAX, would have a hard disk to store a backup copy of the distributed database located in non-volatile RAM in the local stations. This station would also serve as a gateway to the online system, so that data from the control system will be available for logging with the detector data. Apple Macintosh personal computers are being developed for use as the local control consoles. Each would be interfaced to ARCnet to provide access to all control system data. Through the use of bit-mapped graphics with multiple windows and pull-down menus, a cost effective, flexible display system can be provided, taking advantage of familiar modern software tools to support the operator interface.

  14. Design and installation of a multimode microscopy system

    Science.gov (United States)

    Helm, Johannes P.; Haug, Finn-Mogens S.; Storm, Johan F.; Ottersen, Ole-Petter

    2001-04-01

    We describe design and installation of a multi-mode microscopy core facility in an environment of varied research activity in life-sciences. The experimentators can select any combination of a) microscopes (upright, upright fixed-stage, inverted), b) microscopy modes (widefield, DIC, IRDIC, widefield epifluorescence, transmission LSM, reflection and fluorescence CLSM, MPLSM), c) imaging techniques (direct observation, video observation, photography, quantitative camera-recording, flying spot scanning), d) auxiliary systems (equipment for live specimen imaging, electrophysiology, time-coordinated laser-scanning and electrophysiology, patch-clamp). The equipment is installed on one large vibration-isolating optical table (3m X 1.5m X 0.3m). Electronics, auxiliary equipment, and a fiber-coupled, remotely controlled Ar+-Kr+ laser are mounted in a rack system fixed to the ceiling. The design of the shelves allows the head of the CSLM to be moved to any of the microscopes without increasing critical cable lengths. At the same time easy access to all the units is preserved. The beam of a Titanium-Sapphire laser, controlled by means of an EOM and a prism GVD, is coupled directly to the microscopes. Three mirrors mounted on a single precision translation table are integrated into the beam steering system so that the beam can easily be redirected to any of the microscopes. All the available instruments can be operated by the educated and trained user. The system is popular among researchers in neuroanatomy, embryology, cell biology, molecular biology - including the study of protein interactions, e.g. by means of FRET, and electrophysiology. Its colocalization with an EM facility promises to provide considerable synergy effects.

  15. Virtual instrumentation on mobile devices for deployment in nuclear installations

    International Nuclear Information System (INIS)

    Farias, Marcos Santana; Santos, Isaac Jose A. Luquetti dos; Jesus, Miller F. de; Sant'Anna, Claudio Reis de; Szabo, Andre Pedro; Carvalho, Paulo Victor R. de

    2013-01-01

    The virtual instrumentation can be defined as a layer of software and hardware, added to a general purpose computer, so that users can interact with the computer in the same way that they interacted with traditional electronic instruments such as oscilloscopes, multi-meters and signal generators, and may add other functions defined by software. The virtual instrumentation gets a new integration environment, little explored yet, with the great growth that occurred in the mobile devices area. Nowadays it is possible to take measurements in more places by combining mobile devices with data acquisition hardware to create extremely portable and interconnected measurement systems. This paper shows the development of software and hardware that make possible the use of instrumentation on mobile devices for monitoring nuclear installations. It's presented the hardware and the application software for data acquisition of radiation monitors, developed to iOS devices. It's also shown the possibilities of hardware and software to develop near real-time data transfer to and from the field in nuclear installations, with benefits in efficiency, safety and productivity. (author)

  16. Installation of groundwater observation tubes OL-PVP30-35 at Olkiluoto in Eurajoki 2009

    International Nuclear Information System (INIS)

    Toropainen, V.

    2009-10-01

    In order to widen the Posivas groundwater monitoring network at Olkiluoto, Suomen Malmi Oy (Smoy) to install eight new groundwater observation tubes. The identification numbers of the groundwater observation tubes are OL-PVP30, OL-PVP31A and 31B, OL-PVP32, OL-PVP33, OL-PVP34A and 34B and OL-PVP35. The observation tubes were installed between January 28th and February 17th in 2009. The drilling rig used in the installation work was a GM-200 rig. Drilling equipment consisted of casing tubes (n 90/77 mm) with drilling bit, 55 mm geo rods and 64 mm drilling bits. Monitoring pipes (PVC, n 60/52 mm) were lowered into the holes inside the casings. The monitoring pipes consist of a lower section of riser pipe, a middle section of screen pipe and an upper section of riser pipe. The screen pipe slot size is 0.3 mm and the length of the screen section is one or two metres. Protective stainless steel covers with lock-up caps were installed around the monitoring tubes. In addition to the installation of the tubes, the work included observation of soil/drill cuttings quality during drilling, time-penetration measurements and water level measurements after installation. (orig.)

  17. Integrated photovoltaic (PV) monitoring system

    Science.gov (United States)

    Mahinder Singh, Balbir Singh; Husain, NurSyahidah; Mohamed, Norani Muti

    2012-09-01

    The main aim of this research work is to design an accurate and reliable monitoring system to be integrated with solar electricity generating system. The performance monitoring system is required to ensure that the PVEGS is operating at an optimum level. The PV monitoring system is able to measure all the important parameters that determine an optimum performance. The measured values are recorded continuously, as the data acquisition system is connected to a computer, and data is stored at fixed intervals. The data can be locally used and can also be transmitted via internet. The data that appears directly on the local monitoring system is displayed via graphical user interface that was created by using Visual basic and Apache software was used for data transmission The accuracy and reliability of the developed monitoring system was tested against the data that captured simultaneously by using a standard power quality analyzer device. The high correlation which is 97% values indicates the level of accuracy of the monitoring system. The aim of leveraging on a system for continuous monitoring system is achieved, both locally, and can be viewed simultaneously at a remote system.

  18. An analysis of file system and installation of the file management system for NOS operating system

    International Nuclear Information System (INIS)

    Lee, Young Jai; Park, Sun Hee; Hwang, In Ah; Kim, Hee Kyung

    1992-06-01

    In this technical report, we analyze NOS file structure for Cyber 170-875 and Cyber 960-31 computer system. We also describe functions, procedure and how-to-operate and how-to-use of VDS. VDS is used to manage large files effectively for Cyber computer system. The purpose of the VDS installation is to increase the virtual disk storage by utilizing magnetic tape, to assist the users of the computer system in managing their files, and to enhance the performance of KAERI Cyber computer system. (Author)

  19. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  20. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    and requirements that should be considered in the regulation of decommissioning facilities for offshore installations. These facilities need sound expertise to be able to identify and deal with different types of waste, including hazardous waste such as heavy metals, other hazardous substances, low specific activity (LSA) radioactive material and asbestos. Facilities must be designed to allow safe handling of such waste, with no risk of runoff or infiltration into the soil. In addition, a decommissioning facility should have an effective collection system and an on-site treatment plant for contaminated water, including surface water. Each facility must have a sampling and analysis programme to monitor releases of the most relevant pollutants. The need for an environmental monitoring programme to follow developments in the recipient should also be considered. Other factors that must be closely monitored include noise and releases to air in connection with metal cutting and other operations. Moreover, decommissioning contracts must ensure that the costs of handling hazardous waste are met by the offshore operators. When decommissioning facilities for offshore installations are being sited, other interests must also be taken into account; for example, the use of nearby areas for housing, holiday housing or recreation. In addition, the implications for other sectors such as fisheries and agriculture must be taken into consideration. These are important issues that the municipalities must consider when preparing zoning plans and drawing up environmental impact assessments. In many cases, a regional authority is in a better position than a national one to make overall, cross-sectoral assessments of developments within the region. Nevertheless, the report recommends transferring the authority for regulating decommissioning facilities for offshore installations from the County Governors to the Climate and Pollution Agency. Regulating these facilities requires special

  1. Predictive parameters of Legionella pneumophila occurrence in hospital water: HPCs and plumbing system installation age.

    Science.gov (United States)

    Ghanizadeh, Ghader; Mirmohamadlou, Ali; Esmaeli, Davoud

    2016-09-01

    Occurrence of Legionella pneumophila can be relevant to the installation age and the presence of heterotrophic plate counts (HPCs). This research illustrates L. pneumophila contamination of hospital water in accordance with the installation age and the presence of HPCs. One hundred and fifty samples were collected from hot and cold water systems and cultured on R2A and BCYE agar. L. pneumophila identification was done via specific biochemical tests. HPCs and L. pneumophila were detected in 96 and 37.3 % of the samples, respectively. The mean of HPCs density was 947 ± 998 CFU/ml; therefore, 52 % of the samples had higher densities than 500 CFU/ml. High densities of HPCs (>500 CFU/ml) led to colonization of L. pneumophila (≥1000 CFU/ml), mainly observed in cooling systems, gynecological, sonography, and NICU wards. Chi(2) test demonstrated that higher densities (>500 CFU/ml) of HPCs and L. pneumophila contamination in cold water were more frequent than warm water (OR: 2.3 and 1.49, respectively). Univariate regressions implied a significant difference between HPCs density and installation age in positive and negative tests of L. pneumophila (OR = 1.1, p installation age on L. pneumophila occurrences (p installation age (r s  = 0.33, p installation age are relevant; so, plumbing system renovation with appropriate materials and promotion of the effective efforts for hospital's water quality assurance is highly recommended.

  2. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  3. On-line internal corrosion monitoring and data management for remote pipelines: a technology update

    Energy Technology Data Exchange (ETDEWEB)

    Wold, Kjell; Stoen, Roar; Jenssen, Hallgeir [Roxar Flow Measurement AS, Stavanger (Norway); Carvalho, Anna Maria [Roxar do Brasil Ltda., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Internal corrosion monitoring of remote pipelines can be costly and demanding on resources. Online and non-intrusive monitoring directly on the pipe wall can improve the quality of measurements, make installation more convenient and allow more efficient communication of data. The purpose of this paper is to describe a non-intrusive technology, and show examples on field installations of the system. Furthermore, the non-intrusive technology data can be stored, interpreted and combined with conventional (intrusive) system information, in order to get a full picture of internal corrosion profile, corrosion rate and trends regarding the pipeline being monitored. (author)

  4. Mobile radiation monitoring of Mumbai and it's suburb through various road routes by using state-of-the-art radiation monitoring systems

    International Nuclear Information System (INIS)

    Divkar, J.K.; Chatterjee, M.K.; Patil, S.S.; Sharma, Ranjit; Singh, Rajvir; Pradeepkumar, K.S.

    2007-01-01

    The monitoring of environmental radiation in different parts of the country is being periodically carried out with an objective to establish the countrywide baseline dose rate data. The task of quick assessment of impact due to any large-scale radiological emergencies in public domain involves reliable and quick monitoring of dose rate levels using mobile monitoring techniques. In order to achieve higher accuracy and more confidence in measured values, various state-of-the-art monitoring systems are used for mapping a large area. It enables collection and processing of data for rapid and correct evaluation of the situation. The evaluation of measured data from the different systems provides comparable results. This paper describes the radiation mapping of Mumbai and its suburbs carried out through different road routes by installing state-of-the art monitoring systems like CARMS, PMGSS, gamma tracers and micro-R survey meters in a light motor vehicle with the objective of assessing the background radiation level of Mumbai city including Mumbai Suburb, Navi Mumbai and Thane, tagging each data with the positional coordinates and also to detect and locate the presence of orphan sources, if any. The average of measured dose rate levels of Mumbai and Mumbai Suburbs, Navi Mumbai and Thane are 53.3±9.1 nGy.h -1 , 50.9±10.0 nGy.h -1 and 52.1±10.8 nGy.h -1 respectively with maximum ∼ 160 nGy.h -l due to presence of high concentration of 40 K at some locations. (author)

  5. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  6. Installation of a digital, wireless, strong-motion network for monitoring seismic activity in a western Colorado coal mining region

    Energy Technology Data Exchange (ETDEWEB)

    Peter Swanson; Collin Stewart; Wendell Koontz [NIOSH, Spokane, WA (USA). Spokane Research Laboratory

    2007-01-15

    A seismic monitoring network has recently been installed in the North Fork Valley coal mining region of western Colorado as part of a NIOSH mine safety technology transfer project with two longwall coal mine operators. Data recorded with this network will be used to characterize mining related and natural seismic activity in the vicinity of the mines and examine potential hazards due to ground shaking near critical structures such as impoundment dams, reservoirs, and steep slopes. Ten triaxial strong-motion accelerometers have been installed on the surface to form the core of a network that covers approximately 250 square kilometers (100 sq. miles) of rugged canyon-mesa terrain. Spread-spectrum radio networks are used to telemeter continuous streams of seismic waveform data to a central location where they are converted to IP data streams and ported to the Internet for processing, archiving, and analysis. 4 refs.

  7. Vadose zone studies at an industrial contaminated site: the vadose zone monitoring system and cross-hole geophysics

    Science.gov (United States)

    Fernandez de Vera, Natalia; Beaujean, Jean; Jamin, Pierre; Nguyen, Frédéric; Dahan, Ofer; Vanclooster, Marnik; Brouyère, Serge

    2014-05-01

    In order to improve risk characterization and remediation measures for soil and groundwater contamination, there is a need to improve in situ vadose zone characterization. However, most available technologies have been developed in the context of agricultural soils. Such methodologies are not applicable at industrial sites, where soils and contamination differ in origin and composition. In addition, most technologies are applicable only in the first meters of soils, leaving deeper vadose zones with lack of information, in particular on field scale heterogeneity. In order to overcome such difficulties, a vadose zone experiment has been setup at a former industrial site in Belgium. Industrial activities carried out on site left a legacy of soil and groundwater contamination in BTEX, PAH, cyanide and heavy metals. The experiment comprises the combination of two techniques: the Vadose Zone Monitoring System (VMS) and cross-hole geophysics. The VMS allows continuous measurements of water content and temperature at different depths of the vadose zone. In addition, it provides the possibility of pore water sampling at different depths. The system is formed by a flexible sleeve containing monitoring units along its depth which is installed in a slanted borehole. The flexible sleeve contains three types of monitoring units in the vadose zone: Time Domain Transmissometry (TDT), which allows water content measurements; Vadose Sampling Ports (VSP), used for collecting water samples coming from the matrix; the Fracture Samplers (FS), which are used for retrieving water samples from the fractures. Cross-hole geophysics techniques consist in the injection of an electrical current using electrodes installed in vertical boreholes. From measured potential differences, detailed spatial patterns about electrical properties of the subsurface can be inferred. Such spatial patterns are related with subsurface heterogeneities, water content and solute concentrations. Two VMS were

  8. Building system technology with installation bus. Planning now for the future; Gebaeudesystemtechnik - mit Installationsbus. Heute schon an morgen denken

    Energy Technology Data Exchange (ETDEWEB)

    Vogt, D. [RWE Energie AG, Essen (Germany)

    1995-12-31

    In chapter 16 of the anthology about building technology the building system technology with installation bus is described. The following aspects are discussed: limits of the conventional electric installation, building system technology, building system technology - illusion or reality?; The European Installation Bus Association (EIBA). (BWI) [Deutsch] Kapitel 16 des Sammelbandes ueber Building Control ist dem Thema der Gebaeudesystemtechnik mit Installationsbus gewidmet. In diesem Zusammenhang werden folgende Themenbereiche angesprochen: Grenzen der konventionellen Elektroinstallation; Gebaeudesystemtechnik; Gebaeudesystemtechnik - Illusion oder Realitaet?; Die EIBA (European Installation Bus Association). (BWI)

  9. Preliminary installment of total picture archiving and communication systems

    International Nuclear Information System (INIS)

    Takenaka, E.; Takanashi, S.; Suda, Y.; Furui, S.; Yoshida, H.; Hosaka, Y.; Fukui, T.

    1990-01-01

    This paper studied the image quality of various medical digital images and to install a small but total image management and communication system to file images. The system consists of a filing system with a laser scanning digitizer (2,000 x 2,000 x 8 bits), an optical disk (3.8 GB), two HD CRTs, and a 1.6 GB magnetic disk. This system can file on-line the images from a second filing system with FCR (on-line) and a Konica direct imaging system during treatment and follow-up, a CCD TV simulator system for a remote after-loading system, a dose map on CT and MR images through a self-made treatment planning system on the PC level, a CCD TV (RGB) system for local lesions, and portal images, through the imaging plate, for brachytherapy

  10. Tracking the Sun IX: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Technologies Area; Darghouth, Naïm [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Technologies Area; Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Cates, Sarah [Exeter Associates, Columbia, MD (United States); DiSanti, Nicholas [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States)

    2016-08-16

    Now in its ninth edition, Lawrence Berkeley National Laboratory (LBNL)’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected solar photovoltaic (PV) systems in the United States. The present report focuses on residential and non-residential systems installed through year-end 2015, with preliminary trends for the first half of 2016. An accompanying LBNL report, Utility-Scale Solar, addresses trends in the utility-scale sector. This year’s report incorporates a number of important changes and enhancements from prior editions. Among those changes, LBNL has made available a public data file containing all non-confidential project-level data underlying the analysis in this report. Installed pricing trends presented within this report derive primarily from project-level data reported to state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. Refer to the text box to the right for several key notes about these data. In total, data were collected and cleaned for more than 820,000 individual PV systems, representing 85% of U.S. residential and non-residential PV systems installed cumulatively through 2015 and 82% of systems installed in 2015. The analysis in this report is based on a subset of this sample, consisting of roughly 450,000 systems with available installed price data.

  11. Data acquisition, monitoring and diagnostic system for predictive control and protection of rotating components of IEAR-1 reactor by vibration analysis

    International Nuclear Information System (INIS)

    Serra, Reynaldo Cavalcanti; Tecco, Dorival Goncalves

    1996-01-01

    This work presents the vibration and temperature data acquisition, monitoring and diagnostic systems, recently installed in the primary circuit, secondary circuit and emergency generator of the IEA-R1 reactor at IPEN during the course of the first power elevation tests to 5MW. It incorporates a series of routines for equipment configuration, interactive automatic monitoring , data processing and documentation/storage without the exposure of operators in the radiological protection areas. (author)

  12. Real-Time Monitoring System for a Utility-Scale Photovoltaic Power Plant.

    Science.gov (United States)

    Moreno-Garcia, Isabel M; Palacios-Garcia, Emilio J; Pallares-Lopez, Victor; Santiago, Isabel; Gonzalez-Redondo, Miguel J; Varo-Martinez, Marta; Real-Calvo, Rafael J

    2016-05-26

    There is, at present, considerable interest in the storage and dispatchability of photovoltaic (PV) energy, together with the need to manage power flows in real-time. This paper presents a new system, PV-on time, which has been developed to supervise the operating mode of a Grid-Connected Utility-Scale PV Power Plant in order to ensure the reliability and continuity of its supply. This system presents an architecture of acquisition devices, including wireless sensors distributed around the plant, which measure the required information. It is also equipped with a high-precision protocol for synchronizing all data acquisition equipment, something that is necessary for correctly establishing relationships among events in the plant. Moreover, a system for monitoring and supervising all of the distributed devices, as well as for the real-time treatment of all the registered information, is presented. Performances were analyzed in a 400 kW transformation center belonging to a 6.1 MW Utility-Scale PV Power Plant. In addition to monitoring the performance of all of the PV plant's components and detecting any failures or deviations in production, this system enables users to control the power quality of the signal injected and the influence of the installation on the distribution grid.

  13. Real-Time Monitoring System for a Utility-Scale Photovoltaic Power Plant

    Science.gov (United States)

    Moreno-Garcia, Isabel M.; Palacios-Garcia, Emilio J.; Pallares-Lopez, Victor; Santiago, Isabel; Gonzalez-Redondo, Miguel J.; Varo-Martinez, Marta; Real-Calvo, Rafael J.

    2016-01-01

    There is, at present, considerable interest in the storage and dispatchability of photovoltaic (PV) energy, together with the need to manage power flows in real-time. This paper presents a new system, PV-on time, which has been developed to supervise the operating mode of a Grid-Connected Utility-Scale PV Power Plant in order to ensure the reliability and continuity of its supply. This system presents an architecture of acquisition devices, including wireless sensors distributed around the plant, which measure the required information. It is also equipped with a high-precision protocol for synchronizing all data acquisition equipment, something that is necessary for correctly establishing relationships among events in the plant. Moreover, a system for monitoring and supervising all of the distributed devices, as well as for the real-time treatment of all the registered information, is presented. Performances were analyzed in a 400 kW transformation center belonging to a 6.1 MW Utility-Scale PV Power Plant. In addition to monitoring the performance of all of the PV plant’s components and detecting any failures or deviations in production, this system enables users to control the power quality of the signal injected and the influence of the installation on the distribution grid. PMID:27240365

  14. Real-Time Monitoring System for a Utility-Scale Photovoltaic Power Plant

    Directory of Open Access Journals (Sweden)

    Isabel M. Moreno-Garcia

    2016-05-01

    Full Text Available There is, at present, considerable interest in the storage and dispatchability of photovoltaic (PV energy, together with the need to manage power flows in real-time. This paper presents a new system, PV-on time, which has been developed to supervise the operating mode of a Grid-Connected Utility-Scale PV Power Plant in order to ensure the reliability and continuity of its supply. This system presents an architecture of acquisition devices, including wireless sensors distributed around the plant, which measure the required information. It is also equipped with a high-precision protocol for synchronizing all data acquisition equipment, something that is necessary for correctly establishing relationships among events in the plant. Moreover, a system for monitoring and supervising all of the distributed devices, as well as for the real-time treatment of all the registered information, is presented. Performances were analyzed in a 400 kW transformation center belonging to a 6.1 MW Utility-Scale PV Power Plant. In addition to monitoring the performance of all of the PV plant’s components and detecting any failures or deviations in production, this system enables users to control the power quality of the signal injected and the influence of the installation on the distribution grid.

  15. Installation of laboratory scale flue gas treatment system at ALURTRON, MINT

    International Nuclear Information System (INIS)

    Siti A'iasah Hashim; Khairul Zaman Dahlan; Zulkafli Ghazali; Khomsaton Abu Bakar, Ayub Muhamad

    2002-01-01

    A laboratory scale test rig to treat simulated flue gas using electron beam technology was installed at the Alurtron EB-irradiation center, MINT. The experiment test rig was proposed as a result of a feasibility studies conducted jointly by IAEA, MINT and TNB Research in 1997. The test rig system consisted of several components, among other, diesel generator, gas analyzers and spray cooler. The installation was completed and commissioned in October 2001. Results from the commissioning test runs and subsequent experimental work showed that the efficiency of the gas treatment is high. It was proven that electron beam technology might be applied in the treatment of air pollutants. This paper describes the design and work function of the individual major components as well as the full system function. Results from the initial experimental works are also presented. (Author)

  16. Caregivers’ Use of Child Passenger Safety Resources and Quality of Future Child Restraint System Installations

    Directory of Open Access Journals (Sweden)

    Jessica H. Mirman

    2017-10-01

    Full Text Available Objectives: Child Restraint System (CRS misuse is common. We characterized caregivers’ use of child passenger safety informational and instructional resources and determined whether there were differences in the quality of CRS installations associated with prior exposure to specific resources as evaluated in a standardized CRS installation environment. Methods: Caregivers completed self-report surveys and installed a forward-facing CRS in a controlled environment. Installations were evaluated for security (tightness and accuracy (no errors by a child passenger safety technician (CPST. Results: CRS manuals were the most common way caregivers learned to install a CRS. Primary care providers (PCPs were the most frequently endorsed source of CRS safety information. There was no strong pattern of associations between prior exposure to resources and installation quality (security or accuracy, although some evidence supports protective effects of learning from CPSTs; 13% (19 out of 151 installations were secure and 57% (86 out of 151 installations were accurate. Conclusions: A focus on developing effective and lasting behavioral interventions is needed.

  17. Solar space and water heating system installed at Charlottesville, Virginia

    Science.gov (United States)

    1980-01-01

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, is described. The solar energy system consists of 88 single glazed, Sunworks 'Solector' copper base plate collector modules, hot water coils in the hot air ducts, a Domestic Hot Water (DHW) preheat tank, a 3,000 gallon concrete urethane insulated storage tank and other miscellaneous components. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  18. Study of optimal operation management by a monitoring system for corrosion and heat-transfer rate of condensate pipe

    Energy Technology Data Exchange (ETDEWEB)

    Yasui, Katsmi; Kominami, Hirohiko; Atsumi, Tetsuro; Nagata, Koji (Kansai Electric Power Co., Inc., Osaka (Japan); Sumitomo Light Metal Industries Ltd., Tokyo (Japan))

    1988-09-26

    In order to optimize the anticorrosion and antifouling management of aluminum brass condensate pipes, the monitoring system was developed, which could control a corrosion resistance and heat transfer rate during operation. Since a polarization resistance could be used as an index for anticorrosion control, while a heat transmission coefficient or cleanliness factor for heat transfer control, a polarization resistance meter and fouling meter were made as prototype detectors. Fundamental test of a model condenser (simulated by-pass pipe) was performed using a processing system combined with the meters, and monitored data and analytical data of the test were arranged. System performance was ascertained to be preferable by the verification test on a real condenser, however, more compact system was required for practical use because of restriction in by-pass pipe installation. In addition to the monitoring function, a control function for sponge ball cleaning and iron ion injection was also added to keep the specified index value. 13 figs,. 1 tab.

  19. Inductive Monitoring System (IMS)

    Data.gov (United States)

    National Aeronautics and Space Administration — IMS: Inductive Monitoring System The Inductive Monitoring System (IMS) is a tool that uses a data mining technique called clustering to extract models of normal...

  20. CERN safety system monitoring - SSM

    International Nuclear Information System (INIS)

    Hakulinen, T.; Ninin, P.; Valentini, F.; Gonzalez, J.; Salatko-Petryszcze, C.

    2012-01-01

    CERN SSM (Safety System Monitoring) is a system for monitoring state-of-health of the various access and safety systems of the CERN site and accelerator infrastructure. The emphasis of SSM is on the needs of maintenance and system operation with the aim of providing an independent and reliable verification path of the basic operational parameters of each system. Included are all network-connected devices, such as PLCs (local purpose control unit), servers, panel displays, operator posts, etc. The basic monitoring engine of SSM is a freely available system-monitoring framework Zabbix, on top of which a simplified traffic-light-type web-interface has been built. The web-interface of SSM is designed to be ultra-light to facilitate access from hand-held devices over slow connections. The underlying Zabbix system offers history and notification mechanisms typical of advanced monitoring systems. (authors)