WorldWideScience

Sample records for monitoring project united

  1. The international remote monitoring project and implication

    International Nuclear Information System (INIS)

    Sonnier, C.S.; Johnson, C.S.

    1994-01-01

    The future of remote monitoring in International Safeguards system is analyzed. Problems of an update on the International Remote Monitoring Project are considered. The Project allows to remotely transmit safeguards-relevant data directly to IAEA from nuclear facilities worldwide. Description of integrated monitoring system (IMS) is given. A key element of state-of-art of IMS is modular nodal system which accepts information from sensors and provides information to both a data storage unit and a transmitter. Remote Monitoring Systems of Australia and Sweden are presented. 3 figs

  2. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Newcomer, D.R.; Thornton, E.C.; Hartman, M.J.; Dresel, P.E.

    1999-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954 the Resource Conservation and Recovery Act of 1976 the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/frequency matrix for the entire site. The objectives of monitoring fall into three general categories plume and trend tracking, treatment/storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  3. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Hartman, Mary J.; Dresel, P. Evan; Lindberg, Jon W.; Newcomer, Darrell R.; Thornton, Edward C.

    2000-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954; the Resource Conservation and Recovery Act of 1976; the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The U.S. Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/ frequency matrix for the entire site. The objectives of monitoring fall into three general categories: plume and trend tracking, treatment/ storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  4. The WATCH All-Sky Monitor for the Granat Project

    DEFF Research Database (Denmark)

    Brandt, Søren; Lund, Niels; Rao, A. R.

    1990-01-01

    The Watch X-ray all-sky monitor, which is designed to localize strong X-ray sources and follow their development, is examined, focusing on the addition of four Watch units to the Granat satellite project. The components of the Watch instrument are described and the capabilities and potential...... scientific returns of the Granat project are discussed. The applications of the Watch monitor are given, including the study of time variations of known sources and the detection and localization of new, transient sources....

  5. Water Quality Monitoring: An Environmental Studies Unit for Biology 20/30. Teacher's Guide.

    Science.gov (United States)

    Alberta Environment, Edmonton. Environmental Education Resources Branch.

    The objective of this environmental studies unit is to establish a water quality monitoring project for high school students in Alberta while simultaneously providing a unit which meets the objectives of the Biology 20 program (and which may also be used in Biology 10 and 30). Through this project, students assist in the collection,…

  6. Water Quality Monitoring: An Environmental Studies Unit for Biology 20/30. Student Manual.

    Science.gov (United States)

    Alberta Environment, Edmonton. Environmental Education Resources Branch.

    The objective of this environmental studies unit is to establish a water quality monitoring project for high school students in Alberta while simultaneously providing a unit which meets the objectives of the Biology 20 program (and which may also be used in Biology 10 and 30). Through this project, students assist in the collection,…

  7. Project Management Unit for decommissioning of NPP Bohunice VI (2003-2014)

    International Nuclear Information System (INIS)

    Gonzalez Fernandez-conde, A.; Brochet, I.; Ferreira, A.

    2015-01-01

    From October 2003 until december 2014 the Consortium consisting of Iberdrola Engineering and Construction (leader). Empresarios Agrupados Internacional, and Indra Sistemas has carried out the project Project Management Unit ((PMU) for the decommissioning of Bohunice V1 NPP (units 1 and 2), type VVER-440/V-230 in Slovakia. during the first phase (2003-2007) EdF was also part of the Consortium. The project is funded by the Bohunice International Decommissioning Support Fund (BIDSF) administered by the RBRD. The main objective of the project is to provide the necessary engineering and resources of project management for planning, execution, management, coordination and monitoring of all tasks in support of the decommissioning. (Author)

  8. The Kozloduy project management unit

    International Nuclear Information System (INIS)

    Carnes, W.S.; Gros-Gean, P.; Demireva, E.

    2004-01-01

    The Project Management Unit (PMU) has been established in support to the Kozloduy NPP decommissioning department. It is comprised of a Consortium of the British Nuclear Group, EDF and subcontractor ENPRO Consult. It is responsible for the management of seven projects (a facility for dry storage of spent fuel; equipment to treat low activity liquid radioactive waste; provision of physical separation of the plant systems and areas to be decommissioned from the ones in operation; equipment to decontaminate and clean pools and large tanks; a facility to provide high volume reduction of solid radioactive wastes and retrieval and conditioning of ion exchange resins and other sorbents; equipment to provide measurement for the free-release of materials and components; a facility for personnel monitoring, decontamination and clothes changing for work outside of the normal radiological control areas) that will be used in support of the KNPP decommissioning process. The projects will be tendered in compliance with the European Bank for Reconstruction and Development requirements

  9. Development of a unit suitable for corrosion monitoring in district heating systems. Experiences with the LOCOR-cell test method

    DEFF Research Database (Denmark)

    Andersen, Asbjørn; Hilbert, Lisbeth Rischel

    2004-01-01

    A by-pass unit suitable for placement of a number of different probes for corrosion monitoring has been designed. Also measurements of water parameters are allowed in a side stream from the unit. The project is a part of the Nordic Innovation Fund project KORMOF. The by-pass unit has been installed...... in 6 pressurised circulating heating systems and in one cooling system. 7 different corrosion monitoring methods have been used to study corrosion rates and types in dependency of water chemistry. This paper describes the design of the by-pass unit including water analysis methods. It also describes...... the purpose, background and gained results of one of the used monitoring techniques, the crevice corrosion measurements obtained by the LOCOR-Cell„§. The crevice corrosion cell was developed by FORCE Technology in a previous district heating project financed by Nordic Industrial Fund (1)(2). Results from...

  10. Identifying common practices and challenges for local urban tree monitoring programs across the United States

    Science.gov (United States)

    Lara A. Roman; E. Gregory McPherson; Bryant C. Scharenbroch; Julia. Bartens

    2013-01-01

    Urban forest monitoring data are essential to assess the impacts of tree planting campaigns and management programs. Local practitioners have monitoring projects that have not been well documented in the urban forestry literature. To learn more about practitioner-driven monitoring efforts, the authors surveyed 32 local urban forestry organizations across the United...

  11. In-core monitor housing replacement at Fukushima Daiichi Unit No.4

    International Nuclear Information System (INIS)

    Arai, Tomoyuki

    1999-01-01

    The in-core monitor (ICM) housing replacement of a Boiling Water Reactor (BWR) has been completed at Fukushima-Daiichi Unit No. 4 (1F4) of the Tokyo Electric Power Company (TEPCO) in Japan. Since cracking of the inside surface of an ICM housing was found in this unit, the ICM housing was replaced with one made of low-carbon stainless steel (SS) to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. This project is the first application of the replacement procedure for the ICM housing and employs various advanced technologies. The outline of the ICM housing replacement project and applied technologies are discussed in this paper. (author)

  12. 2015 Groundwater Monitoring Report Project Shoal Area: Subsurface Correction Unit 447

    Energy Technology Data Exchange (ETDEWEB)

    Findlay, Rick [Navarro Research and Engineering, Oak Ridge, TN (United States)

    2016-04-01

    The Project Shoal Area in Nevada was the site of a 12-kiloton-yield underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. The corrective action strategy is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. Although water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an evaluation of the groundwater monitoring network will be conducted when water levels at the site have stabilized to the agreement of both the U.S. Department of Energy Office of Legacy Management and the Nevada Division of Environmental Protection.

  13. Advanced Monitoring Systems Initiative Project Achievements for Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Hohman, E.H.; Lohrstorfer, C.L.; Venedam, R.J.; Weeks, S.J.; Fannin, C.R.

    2006-01-01

    The Advanced Monitoring Systems Initiative (AMSI) project has been in existence since 2002. In this short time period, AMSI has successfully developed, tested and/or demonstrated over 30 advanced sensors and monitoring systems for applications in environmental restoration, waste management and other areas of national interest. This presentation summarizes the AMSI project, and gives examples of recent successes. The purpose of the presentation is to make Symposium attendees aware of AMSI's capabilities and experience, for possible use in the future. Example successes include the following: - Automated hexavalent chromium (Cr(VI)) monitoring in wells alongside the Columbia River; - Atmospheric chemical sensor array for remote, real-time plume tracking; - Wireless sensor platform for long-term monitoring of subsurface moisture; - Embedded piezo-resistive micro-cantilever (EPM) units for carbon tetrachloride (CCl 4 ) and hydrogen cyanide (HCN) detection; - 'iHistorian' for efficient, real-time data management of chemical releases. (authors)

  14. Monitoring Completed Navigation Projects Program

    National Research Council Canada - National Science Library

    Bottin, Jr., Robert R

    2001-01-01

    ... (MCNP) Program. The program was formerly known as the Monitoring Completed Coastal Projects Program, but was modified in the late 1990s to include all navigation projects, inland as well as coastal...

  15. Portable air quality sensor unit for participatory monitoring: an end-to-end VESNA-AQ based prototype

    Science.gov (United States)

    Vucnik, Matevz; Robinson, Johanna; Smolnikar, Miha; Kocman, David; Horvat, Milena; Mohorcic, Mihael

    2015-04-01

    Key words: portable air quality sensor, CITI-SENSE, participatory monitoring, VESNA-AQ The emergence of low-cost easy to use portable air quality sensors units is opening new possibilities for individuals to assess their exposure to air pollutants at specific place and time, and share this information through the Internet connection. Such portable sensors units are being used in an ongoing citizen science project called CITI-SENSE, which enables citizens to measure and share the data. The project aims through creating citizens observatories' to empower citizens to contribute to and participate in environmental governance, enabling them to support and influence community and societal priorities as well as associated decision making. An air quality measurement system based on VESNA sensor platform was primarily designed within the project for the use as portable sensor unit in selected pilot cities (Belgrade, Ljubljana and Vienna) for monitoring outdoor exposure to pollutants. However, functionally the same unit with different set of sensors could be used for example as an indoor platform. The version designed for the pilot studies was equipped with the following sensors: NO2, O3, CO, temperature, relative humidity, pressure and accelerometer. The personal sensor unit is battery powered and housed in a plastic box. The VESNA-based air quality (AQ) monitoring system comprises the VESNA-AQ portable sensor unit, a smartphone app and the remote server. Personal sensor unit supports wireless connection to an Android smartphone via built-in Wi-Fi. The smartphone in turn serves also as the communication gateway towards the remote server using any of available data connections. Besides the gateway functionality the role of smartphone is to enrich data coming from the personal sensor unit with the GPS location, timestamps and user defined context. This, together with an accelerometer, enables the user to better estimate ones exposure in relation to physical activities, time

  16. Taming of the monitors: reducing false alarms in intensive care units

    Czech Academy of Sciences Publication Activity Database

    Plešinger, Filip; Klimeš, Petr; Halámek, Josef; Jurák, Pavel

    2016-01-01

    Roč. 37, č. 8 (2016), s. 1313-1325 ISSN 0967-3334 R&D Projects: GA ČR GAP102/12/2034; GA MŠk(CZ) LO1212; GA MŠk ED0017/01/01 Institutional support: RVO:68081731 Keywords : ECG * critical care * arrhythmia * intensive care unit * ICU monitor * false alarm * beat detection Subject RIV: FS - Medical Facilities ; Equipment Impact factor: 2.058, year: 2016

  17. The arrangement of deformation monitoring project and analysis of monitoring data of a hydropower engineering safety monitoring system

    Science.gov (United States)

    Wang, Wanshun; Chen, Zhuo; Li, Xiuwen

    2018-03-01

    The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.

  18. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  19. Monitoring in educational development projects : the development of a monitoring system

    NARCIS (Netherlands)

    Plomp, T.; Huijsman, Hari; Kluyfhout, Eric

    1992-01-01

    Monitoring in education is usually focused on the monitoring of educational systems at different levels. Monitoring of educational projects receives only recently explicit attention. The paper discusses first the concepts of educational monitoring and evaluation. After that, the experience with

  20. 75 FR 8036 - Monitor-Hot Creek Rangeland Project

    Science.gov (United States)

    2010-02-23

    ... DEPARTMENT OF AGRICULTURE Forest Service Monitor-Hot Creek Rangeland Project AGENCY: Forest... Rangeland Project area. The analysis will determine if a change in management direction for livestock grazing is needed to move existing resource conditions within the Monitor-Hot Creek Rangeland Project area...

  1. A project for monitoring trends in burn severity

    Science.gov (United States)

    Eidenshink, Jeffery C.; Schwind, Brian; Brewer, Ken; Zhu, Zhu-Liang; Quayle, Brad; Howard, Stephen M.

    2007-01-01

    Jeff Eidenshink, Brian Schwind, Ken Brewer, Zhi-Liang Zhu, Brad Quayle, and Elected officials and leaders of environmental agencies need information about the effects of large wildfires in order to set policy and make management decisions. Recently, the Wildland Fire Leadership Council (WFLC), which implements and coordinates the National Fire Plan (NFP) and Federal Wildland Fire Management Policies (National Fire Plan 2004), adopted a strategy to monitor the effectiveness of the National Fire Plan and the Healthy Forests Restoration Act (HFRA). One component of this strategy is to assess the environmental impacts of large wildland fires and identify the trends of burn severity on all lands across the United States. To that end, WFLC has sponsored a six-year project, Monitoring Trends in Burn Severity (MTBS), which requires the U.S. Department of Agriculture Forest Service (USDA-FS) and the U.S. Geological Survey (USGS) to map and assess the burn severity for all large current and historical fires. Using Landsat data and the differenced Normalized Burn Ratio (dNBR) algorithm, the USGS Center for Earth Resources Observation and Science (EROS) and USDA-FS Remote Sensing Applications Center will map burn severity of all fires since 1984 greater than 202 ha (500ac) in the east, and 404 ha (1,000 ac) in the west. The number of historical fires from this period combined with current fires occurring during the course of the project will exceed 9,000. The MTBS project will generate burn severity data, maps, and reports, which will be available for use at local, state, and national levels to evaluate trends in burn severity and help develop and assess the effectiveness of land management decisions. Additionally, the information developed will provide a baseline from which to monitor the recovery and health of fire-affected landscapes over time. Spatial and tabular data quantifying burn severity will augment existing information used to estimate risk associated with a range

  2. Project monitoring package (PMP) : A package for project activity monitoring

    International Nuclear Information System (INIS)

    Vyas, K.N.; Kannan, A.; Susandhi, R.; Basu, S.

    1987-01-01

    A package for preparing PERT/CPM network diagrams has been written for PDP-11/34. The program uses PLOT-10 library calls for device interfacing. The package is essentially non-interactive in nature, and reads input data in the form of activity description and duration. It calculates the critical path time and performs time scaling of the events. The report gives a brief outline of the logic used, a sample plot and tabular output for reference. An additional facility for performing project activity monitoring has also been implemented. Activity monitoring generally requires various reports such as feed back reports from various group co-ordinators, information report for project co-ordinator and brief periodical reports for management. A package 'DATATRIEVE' (DTR) on PDP-11/34 system is utilized for generating the above mentioned reports. As DTR can also use normal sequential files, an interfacing program has been written which reformats the files accepted by PERT program acceptable to DTR. Various types of reports as generated by DTR are included. However this part of the package is not transportable and can be implemented only on systems having DTR. 6 figures. (author)

  3. Unit Monitors Manchester-Format Data Buses

    Science.gov (United States)

    Amador, Jose J.

    1994-01-01

    Circuit card converts data signals into convenient hexadecimal form for troubleshooting. Bus-monitoring unit converts data signals from Manchester II format used on data bus into hexadecimal format. Monitoring circuit causes hexadecimal words to display on video terminal, where test engineer compares them with hexadecimal records for troubleshooting. Circuit monitors one bus or two buses simultaneously.

  4. Yakima fisheries project spring chinook supplementation monitoring plan

    International Nuclear Information System (INIS)

    Busack, C.; Pearsons, T.; Knudsen, C.; Phelps, S.; Watson, B.; Johnston, M.

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document

  5. MODEL RANCANGAN SISTEM INFORMASI PROJECT MONITORING

    Directory of Open Access Journals (Sweden)

    Yanti Yanti

    2009-10-01

    Full Text Available Economic development makes the property industry growing very rapidly. The property development is supported by the development of contractor’s company that conducts property development. Inside the contracting company doing business can not perform their own procurement because of the many items that must be provided. For the purposes of the construction company entered into an agreement with the subcontractor as vendor conduct procurement in accordance with the needs of contracting companies. To simplify the procurement process, generally conducted by a process called a tender / auction. This is done by contracting companies to get quality and price in accordance with the desired budget. The company’s commitment subcontractors as the procurement of goods to be one key to successful contracting company doing business development process. Therefore, the subcontractor companies are required to have a good commitment. Therefore we need a project monitoring system that can monitor business processes running on those sub contractor company. The purpose of this research is to design a project monitoring information system in accordance with company requirements to operational activities more effective and efficient company.Keywords: project monitoring, design model, subcontractor

  6. Monitoring and economic factors affecting the economic viability of afforestation for carbon sequestration projects

    International Nuclear Information System (INIS)

    Robertson, Kimberly; Loza-Balbuena, Isabel; Ford-Robertson, Justin

    2004-01-01

    The Kyoto Protocol is the first step towards achieving the objectives of the United Nations Framework Convention on Climate Change and aims among others to promote 'the protection and enhancement of carbon sinks and reservoirs'. To encourage afforestation for carbon sequestration a project must be economically viable. This study uses a model to analyse the impact on project viability of a range of carbon monitoring options, international carbon credit value and discount rate, applied to a Pinus radiata afforestation project in New Zealand. Monitoring carbon in conjunction with conventional forest inventory shows the highest return. Long-term average carbon accounting has lower accounting costs, compared to annual and 5 yearly accounting, as monitoring is only required every 5-10 years until the long-term average is attained. In this study we conclude that monitoring soil carbon stocks is not economically feasible using any of the accounting methods, when carbon is valued at US$ 10/t. This conclusion may be relevant to forest carbon sequestration projects elsewhere in the world and suggests care is needed in selecting the appropriate carbon monitoring options to avoid the risk that costs could be higher than any monetary benefits from terrestrial carbon sequestration. This would remove any commercial incentive to afforest for carbon sequestration reasons and severely limit the use of forest sinks as part of any package of measures addressing the ultimate objective of the UNFCCC

  7. The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J.R.; Heo, T.Y.; Cho, B.H. [Korea Electric Power Research Institute, Taejeon (Korea, Republic of); Kang, T.G.; Kim, H.M.; Kim, Y.S.; Oh, S.M.; Kang, Y.S. [Korea Electric Power Data Network Co., Seoul (Korea, Republic of)

    1997-12-31

    Due to aging of the imported seismic monitoring system of Uljin of t 1 and 2 units it is difficult for this system to provide enough functions needed for the security of seismic safety and the evaluation of the earthquake data from the seismic instrumentation. For this reason, it is necessary to replace the seismic monitoring system of Uljin 1 and 2 units with a new system which has the localized and upgraded hardware and corresponding software. In the part of standardization of existing seismic monitoring system, furthermore, it is necessary to develop the seismic wave analysis system which incorporate newly developed software and can real-timely analyze the seismic wave. This report is the finial product of research project ``The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2`` which have been performed from June 1996 to June 1997 by KEPRI and KDN. Main accomplishments - Review of regulatory criteria for seismic monitoring system -Analysis and upgrade of hardware system -Analysis and upgrade of software system - Development of seismic wave analysis system. (author). 17 refs., 49 figs., 6 tabs.

  8. International remote monitoring project Argentina Nuclear Power Station Spent Fuel Transfer Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, S.; Lucero, R.; Glidewell, D.

    1997-01-01

    The Autoridad Regulataria Nuclear (ARN) and the United States Department of Energy (DOE) are cooperating on the development of a Remote Monitoring System for nuclear nonproliferation efforts. A Remote Monitoring System for spent fuel transfer will be installed at the Argentina Nuclear Power Station in Embalse, Argentina. The system has been designed by Sandia National Laboratories (SNL), with Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) providing gamma and neutron sensors. This project will test and evaluate the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguards efficiency. This paper provides a description of the monitoring system and its functions. The Remote Monitoring System consists of gamma and neutron radiation sensors, RF systems, and video systems integrated into a coherent functioning whole. All sensor data communicate over an Echelon LonWorks Network to a single data logger. The Neumann DCM 14 video module is integrated into the Remote Monitoring System. All sensor and image data are stored on a Data Acquisition System (DAS) and archived and reviewed on a Data and Image Review Station (DIRS). Conventional phone lines are used as the telecommunications link to transmit on-site collected data and images to remote locations. The data and images are authenticated before transmission. Data review stations will be installed at ARN in Buenos Aires, Argentina, ABACC in Rio De Janeiro, IAEA Headquarters in Vienna, and Sandia National Laboratories in Albuquerque, New Mexico. 2 refs., 2 figs

  9. International Energy Agency (IEA) Greenhouse Gas (GHG) Weyburn-Midale CO₂ Monitoring and Storage Project

    Energy Technology Data Exchange (ETDEWEB)

    Sacuta, Norm [Petroleum Technology Research Centre Incorporated, Saskatchewan (Canada); Young, Aleana [Petroleum Technology Research Centre Incorporated, Saskatchewan (Canada); Worth, Kyle [Petroleum Technology Research Centre Incorporated, Saskatchewan (Canada)

    2015-12-22

    The IEAGHG Weyburn-Midale CO₂ Monitoring and Storage Project (WMP) began in 2000 with the first four years of research that confirmed the suitability of the containment complex of the Weyburn oil field in southeastern Saskatchewan as a storage location for CO₂ injected as part of enhanced oil recovery (EOR) operations. The first half of this report covers research conducted from 2010 to 2012, under the funding of the United States Department of Energy (contract DEFE0002697), the Government of Canada, and various other governmental and industry sponsors. The work includes more in-depth analysis of various components of a measurement, monitoring and verification (MMV) program through investigation of data on site characterization and geological integrity, wellbore integrity, storage monitoring (geophysical and geochemical), and performance/risk assessment. These results then led to the development of a Best Practices Manual (BPM) providing oilfield and project operators with guidance on CO₂ storage and CO₂-EOR. In 2013, the USDOE and Government of Saskatchewan exercised an optional phase of the same project to further develop and deploy applied research tools, technologies, and methodologies to the data and research at Weyburn with the aim of assisting regulators and operators in transitioning CO₂-EOR operations into permanent storage. This work, detailed in the second half of this report, involves seven targeted research projects – evaluating the minimum dataset for confirming secure storage; additional overburden monitoring; passive seismic monitoring; history-matched modelling; developing proper wellbore design; casing corrosion evaluation; and assessment of post CO₂-injected core samples. The results from the final and optional phases of the Weyburn-Midale Project confirm the suitability of CO₂-EOR fields for the injection of CO₂, and further, highlight the necessary MMV and follow-up monitoring required for these operations to be considered

  10. Continuation of superpave projects monitoring.

    Science.gov (United States)

    2011-07-01

    This study involved the continuous monitoring of material properties and field performance of twelve Superpave project sections in Florida for the establishment of reasonable and effective mixture design guidelines and criteria, the identification an...

  11. Modern Project: monitoring developments for safe repository operation and staged closure

    International Nuclear Information System (INIS)

    Mayer, S.; Ouchhi, S.; Verstricht, J.; Maurer, H.; Breen, B.

    2010-01-01

    Document available in extended abstract form only. In a first part, the overall objectives of the MoDeRn project (Monitoring Developments for safe Repository operation and stage closure project) are presented. MoDeRn is a four year (2009-2013) collaborative project co-funded under the 7. Framework Program for Nuclear Research and Training (EURATOM). It involves 17 organizations responsible for research into radioactive waste management in the European Union, United States, Japan and Switzerland, with partners with extensive experience in monitoring activities in underground research laboratories (URL); as well as research institutes and universities with substantial experience in research on socio-technical interactions and public and stakeholder engagement. An overview of the project work packages and of their interdependencies is given. The successful implementation of a repository program for radioactive waste relies on both the technical aspects of a sound safety strategy and scientific and engineering excellence as well as on social aspects such as stakeholder acceptance and confidence. Monitoring is considered key in serving both technical and social objectives. It is not only essential to underpin the technical safety strategy and quality of the engineering, but it can also be an important tool for public communication, contributing to public understanding of and confidence in the repository behaviour. By inclusion of specific national contexts of waste management programs in different countries, the MoDeRn project aims at providing a reference framework for development and implementation of monitoring activities. This will be achieved by stakeholder engagement during all identifiable phases of the radioactive waste disposal process. Thus, site characterisation, construction, operation and staged closure, as well as post-closure institutional control phases have to be addressed. MoDeRn considers different host rock types, such as salt, tuff, crystalline rock

  12. Decree 328/003. Is approve the organizational structure reformulation project of the regulatory unit of Unit 006 Energy and water services of subsection 02 Presidency of the Republic

    International Nuclear Information System (INIS)

    2003-01-01

    This decree approve the organizational structure project of The regulatory energy and water services ( URSEA). This unit is responsible for monitoring the activities related to electricity, gas, drinking water, sanitation and oil, fuel and other hydrocarbon derivatives

  13. Volcano-Monitoring Instrumentation in the United States, 2008

    Science.gov (United States)

    Guffanti, Marianne; Diefenbach, Angela K.; Ewert, John W.; Ramsey, David W.; Cervelli, Peter F.; Schilling, Steven P.

    2010-01-01

    The United States is one of the most volcanically active countries in the world. According to the global volcanism database of the Smithsonian Institution, the United States (including its Commonwealth of the Northern Mariana Islands) is home to about 170 volcanoes that are in an eruptive phase, have erupted in historical time, or have not erupted recently but are young enough (eruptions within the past 10,000 years) to be capable of reawakening. From 1980 through 2008, 30 of these volcanoes erupted, several repeatedly. Volcano monitoring in the United States is carried out by the U.S. Geological Survey (USGS) Volcano Hazards Program, which operates a system of five volcano observatories-Alaska Volcano Observatory (AVO), Cascades Volcano Observatory (CVO), Hawaiian Volcano Observatory (HVO), Long Valley Observatory (LVO), and Yellowstone Volcano Observatory (YVO). The observatories issue public alerts about conditions and hazards at U.S. volcanoes in support of the USGS mandate under P.L. 93-288 (Stafford Act) to provide timely warnings of potential volcanic disasters to the affected populace and civil authorities. To make efficient use of the Nation's scientific resources, the volcano observatories operate in partnership with universities and other governmental agencies through various formal agreements. The Consortium of U.S. Volcano Observatories (CUSVO) was established in 2001 to promote scientific cooperation among the Federal, academic, and State agencies involved in observatory operations. Other groups also contribute to volcano monitoring by sponsoring long-term installation of geophysical instruments at some volcanoes for specific research projects. This report describes a database of information about permanently installed ground-based instruments used by the U.S. volcano observatories to monitor volcanic activity (unrest and eruptions). The purposes of this Volcano-Monitoring Instrumentation Database (VMID) are to (1) document the Nation's existing

  14. PNC/DOE Remote Monitoring Project at Japan's Joyo Facility

    International Nuclear Information System (INIS)

    Ross, M.; Hashimoto, Yu; Sonnier, C.; Dupree, S.; Ystesund, K.; Hale, W.

    1996-01-01

    The Power Reactor and Nuclear Fuel Development Corporation (PNC) of Japan and the US Department of Energy (DOE) are cooperating on the development of a remote monitoring system for nuclear nonproliferation efforts. This cooperation is part of a broader safeguards agreement between PNC and DOE. A remote monitoring system is being installed in a spent fuel storage area at PNC's experimental reactor facility Joyo in Oarai. The system has been designed by Sandia National Laboratories (SNL) and is closely related to those used in other SNL remote monitoring projects. The Joyo project will particularly study the unique aspects of remote monitoring in contribution to nuclear nonproliferation. The project will also test and evaluate the fundamental design and implementation of the remote monitoring system in its application to regional and international safeguards efficiency. This paper will present a short history of the cooperation, the details of the monitoring system and a general schedule of activities

  15. Jaguar surveying and monitoring in the United States

    Science.gov (United States)

    Culver, Melanie

    2016-06-10

    Because of the jaguar’s (Panthera onca) endangered status under the Endangered Species Act (ESA) of 1973 throughout its range (from Arizona in the north to Argentina in the south), jaguar individuals and populations are monitored to varying degrees throughout their range. Knowledge gained from monitoring jaguars is helpful for wildlife managers who are responsible for conserving this species. The University of Arizona (UA) has conducted a multiyear surveying and monitoring effort for jaguars and ocelots in southern Arizona and New Mexico. The purpose of this work was to establish an effective surveying and monitoring system for jaguars along the United States-Mexico border. Surveying and monitoring in this study focused on the United States side of the border, but the methods could also be used in Mexico. The intent was to develop and implement a surveying and monitoring system that would provide the greatest probability of recording jaguar presence in, and passage through, the border area.

  16. Het Project Monitoring Risicofactoren en Gezondheid Nederland (MORGEN-project). Jaarverslag 1993

    NARCIS (Netherlands)

    Smit HA; Verschuren WMM; Bueno de Mesquita HB; Seidell JC; CCM

    1994-01-01

    The Monitoring Project on Risk Factors for Chronic Diseases (MORGEN-project) is conducted by the National Institute of Public Health and Environmental Protection (RIVM). Its general purpose is to determine the prevalence of risk factors for chronic diseases as well as the prevalence of some specific

  17. Inventory of current environmental monitoring projects in the US-Canadian transboundary region

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; Ballinger, M.Y.; Chapman, E.G.

    1986-05-01

    This document presents the results of a study commissioned to survey and summarize major environmental monitoring projects in the US-Canadian transboundary region. Projects with field sites located within 400 km (250 mi) of the border and active after 1980 were reviewed. The types of projects included: ambient air-quality monitoring, ambient water-quality monitoring, deposition monitoring, forest/vegetation monitoring and research, soil studies, and ecosystem studies. Ecosystem studies included projects involving the measurement of parameters from more than one monitoring category (e.g., studies that measured both water and soil chemistry). Individual descriptions were formulated for 184 projects meeting the spatial and temporal criteria. Descriptions included the official title for the project, its common abbreviation, program emphasis, monitoring site locations, time period conducted, parameters measured, protocols employed, frequency of sample collection, data storage information, and the principal contact for the project. A summary inventory subdivided according to the six monitoring categories was prepared using a computerized data management system. Information on major centralized data bases in the field of environmental monitoring was also obtained, and summary descriptions were prepared. The inventory and data base descriptions are presented in appendices to this document.

  18. Geophysical monitoring of active hydrologic processes as part of the Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    Newmark, R.L.

    1992-05-01

    Lawrence Livermore National Laboratory, in collaboration with University of California at Berkeley and Lawrence Berkeley Laboratory, is conducting the Dynamic Underground Stripping Project (DUSP), an integrated project demonstrating the use of active thermal techniques to remove subsurface organic contamination. Complementary techniques address a number of environmental restoration problems: (1) steam flood strips organic contaminants from permeable zones, (2) electrical heating drives contaminants from less permeable zones into the more permeable zones from which they can be extracted, and (3) geophysical monitoring tracks and images the progress of the thermal fronts, providing feedback and control of the active processes. The first DUSP phase involved combined steam injection and vapor extraction in a ''clean'' site in the Livermore Valley consisting of unconsolidated alluvial interbeds of clays, sands and gravels. Steam passed rapidly through a high-permeability gravel unit, where in situ temperatures reached 117 degree C. An integrated program of geophysical monitoring was carried out at the Clean Site. We performed electrical resistance tomography (ERT), seismic tomography (crossborehole), induction tomography, passive seismic monitoring, a variety of different temperature measurement techniques and conventional geophysical well logging

  19. Comparison of monitor units calculated by radiotherapy treatment planning system and an independent monitor unit verification software.

    Science.gov (United States)

    Sellakumar, P; Arun, C; Sanjay, S S; Ramesh, S B

    2011-01-01

    In radiation therapy, the monitor units (MU) needed to deliver a treatment plan are calculated by treatment planning systems (TPS). The essential part of quality assurance is to verify the MU with independent monitor unit calculation to correct any potential errors prior to the start of treatment. In this study, we have compared the MU calculated by TPS and by independent MU verification software. The MU verification software was commissioned and tested for the data integrity to ensure that the correct beam data was considered for MU calculations. The accuracy of the calculations was tested by creating a series of test plans and comparing them with ion chamber measurements. The results show that there is good agreement between the two. The MU difference (MUdiff) between the monitor unit calculations of TPS and independent MU verification system was calculated for 623 fields from 245 patients and was analyzed by treatment site for head & neck, thorax, breast, abdomen and pelvis. The mean MUdiff of -0.838% with a standard deviation of 3.04% was observed for all 623 fields. The site specific standard deviation of MUdiff was as follows: abdomen and pelvis (<1.75%), head & neck (2.5%), thorax (2.32%) and breast (6.01%). The disparities were analyzed and different correction methods were used to reduce the disparity. © 2010 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  20. Spring Chinook Supplementation Monitoring; Yakima Fisheries Project Management Plan, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A. (Washington Department of Fish and Wildlife, Olympia, WA); Watson, Bruce; Johnston, Mark (Confederated Tribes and Bands of the Yakama Nation, Fisheries Resource Management, Toppenish, WA)

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.

  1. Solar Wind Monitor--A School Geophysics Project

    Science.gov (United States)

    Robinson, Ian

    2018-01-01

    Described is an established geophysics project to construct a solar wind monitor based on a nT resolution fluxgate magnetometer. Low-cost and appropriate from school to university level it incorporates elements of astrophysics, geophysics, electronics, programming, computer networking and signal processing. The system monitors the earth's field in…

  2. River Corridor Project Workplace Air Monitoring Technical Basis

    International Nuclear Information System (INIS)

    MANTOOTH, D.S.

    2001-01-01

    This document provides the technical basis by which the workplace air monitoring and sampling program is operated in the River Corridor Project (RCP). Revision 2 addresses and incorporates changes in the air monitoring program drivers and implementing documents which occurred after the previous revision was issued. This revision also includes an additional RCP project to make Revision 2 applicable to the entire RCP. These changes occurred in the following areas: (1) Changes resulting from the conversion of the Hanford Site Radiological Control Manual (HSRCM-1) into the Project Hanford Radiological Control Manual (F-5173). HNF-5173 is now the implementing document for 10CFR835. (2) Changes resulting from the issue of new and revised Hanford Site implementing procedures. (3) Changes resulting from the issue of new and revised, as well as the cancellation of RCP implementing procedures. (4) Addition of the 200 Area Accelerated Deactivation Project (ADP). (5) Modification of some air sampling/monitoring locations to better meet the needs of facility operations. (6) Changes resulting from the RCP reorganization

  3. Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-04-01

    This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of the CNTA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 443 are specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense, and the State of Nevada and includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the CNTA The CNTA is located north of U.S. Highway 6, approximately 30 miles north of Warm Springs in Nye County, Nevada (Figure 1). Three emplacement boreholes, UC-1, UC-3, and UC-4, were drilled at the CNTA for underground nuclear weapons testing. The initial underground nuclear test, Project Faultless, was conducted in borehole UC-1 at a depth of 3,199 feet (ft) (975 meters) below ground surface on January 19, 1968. The yield of the Project Faultless test was estimated to be 0.2 to 1 megaton (DOE 2004). The test resulted in a down-dropped fault block visible at land surface (Figure 2). No further testing was conducted at the CNTA, and the site was decommissioned as a testing facility in 1973.

  4. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  5. Coalescence measurements for evolving foams monitored by real-time projection imaging

    International Nuclear Information System (INIS)

    Myagotin, A; Helfen, L; Baumbach, T

    2009-01-01

    Real-time radiographic projection imaging together with novel spatio-temporal image analysis is presented to be a powerful technique for the quantitative analysis of coalescence processes accompanying the generation and temporal evolution of foams and emulsions. Coalescence events can be identified as discontinuities in a spatio-temporal image representing a sequence of projection images. Detection, identification of intensity and localization of the discontinuities exploit a violation criterion of the Fourier shift theorem and are based on recursive spatio-temporal image partitioning. The proposed method is suited for automated measurements of discontinuity rates (i.e., discontinuity intensity per unit time), so that large series of radiographs can be analyzed without user intervention. The application potential is demonstrated by the quantification of coalescence during the formation and decay of metal foams monitored by real-time x-ray radiography

  6. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  7. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  8. An IoT Project for Vital Signs Monitoring

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2017-01-01

    Full Text Available Nowadays, the Internet of Things (IoT projects are very popular and they are developed for numerous fields. In order to detect various medical problems on time, it is required to monitor the subjects either human or non-human. This could be used on regular or specific activities, like sport or work. It is necessary to determine the factors that could lead to medical problems. Another important aspect is to quantify the factors, to monitor them, to collect data and to make the proper interpretation. This could be achieved using dedicated sensors, controlled by an application embedded on a development board. When a dangerous value is reached, the system has to inform the subject (if human or someone else (if non-human. This paper presents an Arduino based IoT project used for monitoring the vital signs for human and non-human and the results based on its usage. The paper details the hardware and software components of this project.

  9. Monitoring the effectiveness evaluation of investment projects

    Directory of Open Access Journals (Sweden)

    Skopin Alex O.

    2012-02-01

    Full Text Available The article raised the question of monitoring regulatory evaluation of the effectiveness of regional investment projects. This is justified by the fact that the current regulatory framework defined indicators for measuring the effectiveness of regional investment projects, but these figures are usually used only at the design stage of the project, an interim assessment of the effectiveness of a sufficiently simplified and based on the level of exploration investment.

  10. Habitat Demonstration Unit Project Leadership and Management Strategies

    Science.gov (United States)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  11. A Framework for Effective Software Monitoring in Project Management

    African Journals Online (AJOL)

    A Framework for Effective Software Monitoring in Project Management. ... is shown to provide meaningful interpretation of collected metric data by embedding certain quality function. Key words: Project Management, Feedback, project control, metrics, process model, quantitative validity ... AJOL African Journals Online.

  12. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  13. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada

    International Nuclear Information System (INIS)

    Rick Findlay

    2006-01-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation

  14. A synthesis of evaluation monitoring projects by the forest health monitoring program (1998-2007)

    Science.gov (United States)

    William A. Bechtold; Michael J. Bohne; Barbara L. Conkling; Dana L. Friedman

    2012-01-01

    The national Forest Health Monitoring Program of the Forest Service, U.S. Department of Agriculture, has funded over 200 Evaluation Monitoring projects. Evaluation Monitoring is designed to verify and define the extent of deterioration in forest ecosystems where potential problems have been identified. This report is a synthesis of results from over 150 Evaluation...

  15. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  16. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  17. Automatic Flushing Unit With Cleanliness Monitor

    Science.gov (United States)

    Hildebrandt, N. E.

    1982-01-01

    Liquid-level probe kept clean, therefore at peak accuracy, by unit that flushes probe with solvent, monitors effluent for contamination, and determines probe is particle-free. Approach may be adaptable to industrial cleaning such as flushing filters and pipes, and ensuring that manufactured parts have been adequately cleaned.

  18. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  19. On the hazard rate process for imperfectly monitored multi-unit systems

    International Nuclear Information System (INIS)

    Barros, A.; Berenguer, C.; Grall, A.

    2005-01-01

    The aim of this paper is to present a stochastic model to characterize the failure distribution of multi-unit systems when the current units state is imperfectly monitored. The definition of the hazard rate process existing with perfect monitoring is extended to the realistic case where the units failure time are not always detected (non-detection events). The so defined observed hazard rate process gives a better representation of the system behavior than the classical failure rate calculated without any information on the units state and than the hazard rate process based on perfect monitoring information. The quality of this representation is, however, conditioned by the monotony property of the process. This problem is mainly discussed and illustrated on a practical example (two parallel units). The results obtained motivate the use of the observed hazard rate process to characterize the stochastic behavior of the multi-unit systems and to optimize for example preventive maintenance policies

  20. On the hazard rate process for imperfectly monitored multi-unit systems

    Energy Technology Data Exchange (ETDEWEB)

    Barros, A. [Institut des Sciences et Techonologies de l' Information de Troyes (ISTIT-CNRS), Equipe de Modelisation et Surete des Systemes, Universite de Technologie de Troyes (UTT), 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France)]. E-mail: anne.barros@utt.fr; Berenguer, C. [Institut des Sciences et Techonologies de l' Information de Troyes (ISTIT-CNRS), Equipe de Modelisation et Surete des Systemes, Universite de Technologie de Troyes (UTT), 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Grall, A. [Institut des Sciences et Techonologies de l' Information de Troyes (ISTIT-CNRS), Equipe de Modelisation et Surete des Systemes, Universite de Technologie de Troyes (UTT), 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France)

    2005-12-01

    The aim of this paper is to present a stochastic model to characterize the failure distribution of multi-unit systems when the current units state is imperfectly monitored. The definition of the hazard rate process existing with perfect monitoring is extended to the realistic case where the units failure time are not always detected (non-detection events). The so defined observed hazard rate process gives a better representation of the system behavior than the classical failure rate calculated without any information on the units state and than the hazard rate process based on perfect monitoring information. The quality of this representation is, however, conditioned by the monotony property of the process. This problem is mainly discussed and illustrated on a practical example (two parallel units). The results obtained motivate the use of the observed hazard rate process to characterize the stochastic behavior of the multi-unit systems and to optimize for example preventive maintenance policies.

  1. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  2. Data-intensive structural health monitoring in the infrawatch project

    NARCIS (Netherlands)

    Veerman, R.P.; Miao, S.; Koenders, E.A.B.; Knobbe, A.

    2013-01-01

    The InfraWatch project is a Dutch research project, aimed at developing novel techniques for large-scale monitoring of concrete infra-structures. The project involves a large bridge, fitted with multiple types of sensors that capture the high-resolution dynamic behavior of the bridge. With 145

  3. Analysis of the necessity for inserting new surveillance capsule into the Kori Unit 1 RPV to monitor material fracture toughness

    International Nuclear Information System (INIS)

    Song, Taek Ho

    2007-01-01

    In association with monitoring of reactor pressure vessel (RPV) fracture toughness, surveillance capsule test specimens have been used to monitor the material property of nuclear reactor vessel. As far as Kori Unit 1 is concerned, 6 capsules were put into the vessel before commercial operation of the plant. Up to now, all the six capsules have been withdrawn to test and monitor the fracture toughness of RPV material. The last capsule has been withdrawn on June this year, and the Kori unit 1 has been shut downed since July 2007 and will be shut downed until December this year for about 6 months, preparing the life extension of the plant to operate the plant 10 more years. With the situation that all the surveillance capsules have been withdrawn, public ask the following question, 'To extend the life of Kori Unit 1 more than 10 years, is it necessary to insert new surveillance capsules into the Kori Unit 1 to monitor RPV material fracture toughness?' In connection with this issue, planning project have been carried out since spring this year. In this paper, it is described that inserting new surveillance capsule into the Kori Unit 1 RPV has some meaning in some public acceptance point of view and is not necessary in material engineering point of view

  4. Minneapolis Multi-Ethnic Curriculum Project--Migration Unit.

    Science.gov (United States)

    Minneapolis Public Schools, Minn. Dept. of Intergroup Education.

    The student booklet presents short chapters illustrating the migration unit of the Minneapolis Multi-Ethnic Curriculum Project for secondary schools. Sixteen brief chapters describe migration, immigration, and emigration in the United States. The first six chapters offer first person accounts of immigrants from Norway, Korea, Egypt, Hitler's…

  5. Tools for Monitoring Social Media: A Marketing Research Project

    Science.gov (United States)

    Veeck, Ann; Hoger, Beth

    2014-01-01

    Knowledge of how to effectively monitor social media is an increasingly valued marketing research skill. This study tests an approach for adding social media content to an undergraduate marketing research class team project. The revised project maintains the expected objectives and parameters of a traditional research project, while integrating…

  6. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  7. Knowledge capture and preservation at Cernavoda Unit 2 Project

    International Nuclear Information System (INIS)

    Condu, M.; Chirica, T.; Popescu, D.; Marculescu, N.

    2007-01-01

    Full text: As it is known, Cernavoda Unit 2 - Romania, is a delayed nuclear power plant (NPP), started in early '80s, works were frozen in 1990 and resumed in 2003 under a management contract concluded by Nuclearelectrica, the Romanian nuclear utility, with Atomic Energy of Canada Ltd (AECL)-Canada and Ansaldo - Italy. This project has many specificities, including long time stored equipment, some works done 15 to 20 years ago; technology developments during these years; only couple of staff available from those initially involved; and a forthcoming project (Cernavoda Units 3 and 4) in its latest development phase. On top of that, like in other Eastern European countries, Nuclearelectrica is losing people due to salary issue and 'brain drain'. In the actual international situation where the nuclear energy contribution to energy mix is under reconsideration and where the demand for qualified personnel significantly exceeds the offer, it is estimated that maybe the biggest challenge of the forthcoming Cernavoda Units 3 and 4 would be availability of human resources. As Cernavoda Unit 2 Project goes towards a successful completion, all those who put lots of efforts and a difficult to overestimate contribution to overcome all challenges of this special Project will leave one after the other. Special attention is being given by Nuclearelectrica and the main contractors AECL and Ansaldo capturing the knowledge (both explicit and tacit) accumulated in these last almost five years and to leave to those who will continue the forthcoming Unit 3 and 4 Projects and to the nuclear industry in general. The objective on knowledge capture and preservation is to gather all experience and lessons learned during contracting, financing, constructing and commissioning of NPP Cernavoda Unit 2, with a focus on tacit knowledge and to asses potential improvements that might be applied in the forthcoming projects, in order to improve nuclear and economic performance. There are couple of

  8. Cernavoda - Unit 2. A strategic project for Romania

    International Nuclear Information System (INIS)

    Saroudis, J.I.; Chirica, T.; Villabruna, G.

    1999-01-01

    The paper presents some key aspects of the Romanian nuclear program, focusing on Cernavoda NPP Unit No. 2 and the partnership with Atomic Energy of Canada Ltd. (AECL) and ANSALDO Italy for completion of this project. A brief historical presentation of the Romanian nuclear program is included. The success of Cernavoda NPP Unit 1 represents an important element in finalizing Unit 2 in an advanced state of equipment installation and more than 40 % complete. Also, the national infrastructure, including the legal framework and new Electricity Law represents a positive element for Project completion. The Romanian Nuclear Regulatory Body represents the guarantee for the safe operation of CANDU reactors in Romania.(author)

  9. Outdoor radon monitoring plan for the UMTRA Project sites

    International Nuclear Information System (INIS)

    1986-02-01

    This document describes the monitoring schedules and methods used to measure ambient radon concentrations around Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Radon monitoring at both processing sites and disposal sites is performed primarily for two reasons. The first, and foremost, of these is to provide a means to keep the off-site radon concentrations during the construction activities As Low As Reasonably Achievable (ALARA). The second purpose is to provide a basis for comparison with the EPA standards developed for the UMTRA Project. Radon monitoring data are also used to demonstrate compliance with ambient concentration standards and for public information due to concern about potential radiation releases during construction. 1 fig., 1 tab

  10. Decommissioning project management unit started its activities

    International Nuclear Information System (INIS)

    Medeliene, D.

    2002-01-01

    The Decommissioning Project Management Unit team comprises western experts as well as experts from INPP Decommissioning Service who all work as a single team. The DPMU will develop the Final Decommissioning Plan and a more detailed Decommissioning Project, which will describe how the plant will be removed from service and safely decommissioned

  11. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  12. Atmosphere Resource Recovery & Environmental Monitoring for Long Duration Exploration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Atmosphere Resource Recovery & Environmental Monitoring (ARREM) for Long Duration Exploration Project project is maturing Atmosphere Revitalization...

  13. Stack monitor for the Proof-of-Breeding Project

    International Nuclear Information System (INIS)

    Fergus, R.W.

    1985-01-01

    This stack monitor system is a coordinated arrangement of hardware and software to monitor four hot cells (8 stacks) during the fuel dissection for the Proof-of-Breeding Project. The cell monitors, which are located in fan lofts, contain a microprocessor, radiation detectors, air flow sensors, and air flow control equipment. Design criteria included maximizing microprocessor control while minimizing the hardware complexity. The monitors have been programmed to produce concentration and total activity release data based on several detector measurements and flow rates. Although each monitor can function independently, a microcomputer can also be used to control each cell monitor including reprogramming if necessary. All programming is software, as opposed to firmware, with machine language for compactness in the cell monitors and Basic language for adaptability in the microcomputer controller

  14. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2013-01-01

    Today, with the growth of complex projects, stakeholder involvement in projects, advances in computer technology for dashboard designs, metrics, and key performance indicators for project management have become an important focus. This Second Edition of the bestselling book walks readers through everything from the basics of project management metrics and key performance indicators to establishing targets and using dashboards to monitor performance. The content is aligned with PMI's PMBOK Guide and stresses "value" as the main focal point.

  15. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  16. PERMEABLE TREATMENT WALL EFFECTIVENESS MONITORING PROJECT, NEVADA STEWART MINE

    Science.gov (United States)

    This report summarizes the results of Mine Waste Technology Program (MWTP) Activity III, Project 39, Permeable Treatment Wall Effectiveness Monitoring Project, implemented and funded by the U.S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U.S. De...

  17. Developing and implementing a monitoring programme: recommendations provided by the MODERN project

    International Nuclear Information System (INIS)

    Mayer, S.; Bergmans, A.; Garcia-Sineriz, J.L.; Breen, B.; Jobmann, M.

    2012-01-01

    Document available in extended abstract form only. The successful implementation of a repository programme relies on both the technical aspects of a sound safety strategy, and scientific and engineering excellence, as well as on social aspects such as public acceptance. Monitoring has the potential to contribute to both of these aspects and thus to play an important role as national radioactive waste disposal programmes move forward towards safe and accepted implementation of geological disposal. The main goal of the 'Monitoring Developments for Safe Repository Operation and staged Closure' (MoDeRn) Project is to take the state-of-the-art of broadly accepted, main monitoring objectives and to develop these to a level of description that is closer to the actual implementation of monitoring during the staged approach of the disposal process. It should be noted that the MoDeRn project recognizes the diversity of monitoring activities that will be required in a repository, in particular related to operational safety, nuclear safeguards and environmental impact assessment. The projects emphasis, however, is on monitoring conducted to verify expected repository system evolutions - i.e. evolutions of the natural environment and the engineered system - during a phase of progressive construction, operation and closure that may last on the order of a century. This serves the purpose of confirming and possibly enhancing the prior license basis for safety and pre-closure management options. Achieving this goal includes analysis of whether the implementation of a realistic monitoring programme is likely to address expert and lay stakeholder expectations (objectives), to provide an understanding of monitoring activities and available technologies that can be implemented in a repository context (feasibility), and to provide recommendations for related, future stakeholder engagement activities (social acceptance). These are carried out by the 18 project partners representing 12

  18. Surveillance Monitoring Management for General Care Units: Strategy, Design, and Implementation.

    Science.gov (United States)

    McGrath, Susan P; Taenzer, Andreas H; Karon, Nancy; Blike, George

    2016-07-01

    The growing number of monitoring devices, combined with suboptimal patient monitoring and alarm management strategies, has increased "alarm fatigue," which have led to serious consequences. Most reported alarm man- agement approaches have focused on the critical care setting. Since 2007 Dartmouth-Hitchcock (Lebanon, New Hamp- shire) has developed a generalizable and effective design, implementation, and performance evaluation approach to alarm systems for continuous monitoring in general care settings (that is, patient surveillance monitoring). In late 2007, a patient surveillance monitoring system was piloted on the basis of a structured design and implementation approach in a 36-bed orthopedics unit. Beginning in early 2009, it was expanded to cover more than 200 inpatient beds in all medicine and surgical units, except for psychiatry and labor and delivery. Improvements in clinical outcomes (reduction of unplanned transfers by 50% and reduction of rescue events by more than 60% in 2008) and approximately two alarms per patient per 12-hour nursing shift in the original pilot unit have been sustained across most D-H general care units in spite of increasing patient acuity and unit occupancy. Sample analysis of pager notifications indicates that more than 85% of all alarm conditions are resolved within 30 seconds and that more than 99% are resolved before escalation is triggered. The D-H surveillance monitoring system employs several important, generalizable features to manage alarms in a general care setting: alarm delays, static thresholds set appropriately for the prevalence of events in this setting, directed alarm annunciation, and policy-driven customization of thresholds to allow clinicians to respond to needs of individual patients. The systematic approach to design, implementation, and performance management has been key to the success of the system.

  19. Monitoring water for radioactive releases in the United States

    International Nuclear Information System (INIS)

    Porter, C.R.; Broadway, J.A.; Kahn, B.

    1990-01-01

    The major radiological environmental monitoring programs for water in the United States are described. The applications of these programs for monitoring radioactive fallout, routine discharges from nuclear facilities, and releases due to accidents at such facilities are discussed, and some examples of measurements are presented. The programs monitor rainfall, surface water, and water supplies. Samples are usually collected and analyzed on a monthly or quarterly schedule, but the frequency is increased in response to emergencies. (author)

  20. Statistical analysis of the vibration loading of the reactor internals and fuel assemblies of reactor units type WWER-440 from deferent projects

    International Nuclear Information System (INIS)

    Ovcharov, O.; Pavelko, V.; Usanov, A.; Arkadov, G.; Dolgov, A.; Molchanov, V.; Anikeev, J.; Pljush, A.

    2006-01-01

    In this paper the following items have been presented: 1) Vibration noise instrument channels; 2) Vibration loading characteristics of control assemblies, internals and design peculiarities of internals of WWER-440 deferent projects; 3) Coolant flow rate through the reactor, reactor core, fuel assemblies and control assemblies for different projects WWER-440 and 4) Noise measurements of coolant speed per channel. The change of auto power spectrum density of absolute displacement detector signal for the last 12 years of SUS monitoring of the Kola NPP unit 2; the coherence functions groups between two SPND of the same level for the Kola NPP unit 1; the measured coolant flow rate at Paks NPP and the auto power spectrum density group of SPND signals from 11 neutron measuring channels of the Kola NPP unit 1 are given. The main factors of vibration loading of internals and fuel assemblies for Kola NPP units 1-4, Bohunice NPP units 1 and 2 and Novovoronezh NPP units 3 and 4 are also discussed

  1. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  2. MODULAR CAUSTIC SIDE SOLVENT EXTRACTION UNIT (MCU) GAMMA MONITORS SYSTEM FINAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Casella, V

    2005-12-15

    The Department of Energy (DOE) selected Caustic-Side Solvent Extraction (CSSX) as the preferred technology for the removal of radioactive cesium from High-Level Waste (HLW) at the Savannah River Site (SRS). Before the full-scale Salt Waste Processing Facility (SWPF) becomes operational, the Closure Business Unit (CBU) plans to process a portion of dissolved saltcake waste through a Modular CSSX Unit (MCU). This work was derived from Technical Task Request SP-TTR-2004-00013, ''Gamma Monitor for MCU''. The deliverables for this task are the hardware and software for the gamma monitors and a report summarizing the testing and acceptance of this equipment for use in the MCU. Gamma-ray monitors are required to: (1) Measure the Cs-137 concentration in the decontaminated salt solution before entering the DSS (Decontaminated Salt Solution) Hold Tank, (2) Measure the Cs-137 concentration in the strip effluent before entering the Strip Effluent Hold Tank, (3) Verify proper operation of the solvent extraction system by verifying material balance within the process (The DSS Hold Tank Cs-137 concentration will be very low and the Cs-137 concentration in the Strip Effluent Hold Tank will be fifteen times higher than the Cs-137 concentration in the Feed Tank.) Sodium iodide monitors are used to measure the Cs-137 concentration in the piping before the DSS Hold tank, while GM monitors are used for Cs-137 measurements before the Strip Effluent Hold Tank. Tungsten shields were designed using Monte Carlo calculations and fabricated to reduce the process background radiation at the detector positions. These monitors were calibrated with NIST traceable standards that were specially made to be the same as the piping being monitored. Since this gamma ray monitoring system is unique, specially designed software was written and acceptance tested by Savannah River National Laboratory personnel. The software is a LabView-based application that serves as a unified

  3. MODULAR CAUSTIC SIDE SOLVENT EXTRACTION UNIT (MCU) GAMMA MONITORS SYSTEM FINAL REPORT

    International Nuclear Information System (INIS)

    Casella, V

    2005-01-01

    The Department of Energy (DOE) selected Caustic-Side Solvent Extraction (CSSX) as the preferred technology for the removal of radioactive cesium from High-Level Waste (HLW) at the Savannah River Site (SRS). Before the full-scale Salt Waste Processing Facility (SWPF) becomes operational, the Closure Business Unit (CBU) plans to process a portion of dissolved saltcake waste through a Modular CSSX Unit (MCU). This work was derived from Technical Task Request SP-TTR-2004-00013, ''Gamma Monitor for MCU''. The deliverables for this task are the hardware and software for the gamma monitors and a report summarizing the testing and acceptance of this equipment for use in the MCU. Gamma-ray monitors are required to: (1) Measure the Cs-137 concentration in the decontaminated salt solution before entering the DSS (Decontaminated Salt Solution) Hold Tank, (2) Measure the Cs-137 concentration in the strip effluent before entering the Strip Effluent Hold Tank, (3) Verify proper operation of the solvent extraction system by verifying material balance within the process (The DSS Hold Tank Cs-137 concentration will be very low and the Cs-137 concentration in the Strip Effluent Hold Tank will be fifteen times higher than the Cs-137 concentration in the Feed Tank.) Sodium iodide monitors are used to measure the Cs-137 concentration in the piping before the DSS Hold tank, while GM monitors are used for Cs-137 measurements before the Strip Effluent Hold Tank. Tungsten shields were designed using Monte Carlo calculations and fabricated to reduce the process background radiation at the detector positions. These monitors were calibrated with NIST traceable standards that were specially made to be the same as the piping being monitored. Since this gamma ray monitoring system is unique, specially designed software was written and acceptance tested by Savannah River National Laboratory personnel. The software is a LabView-based application that serves as a unified interface for controlling

  4. Enhanced dynamic wedge and independent monitor unit verification

    International Nuclear Information System (INIS)

    Howlett, SJ.

    2005-01-01

    Some serious radiation accidents have occurred around the world during the delivery of radiotherapy treatment. The regrettable incident in Panama clearly indicated the need for independent monitor unit (MU) verification. Indeed the International Atomic Energy Agency (IAEA), after investigating the incident, made specific recommendations for radiotherapy centres which included an independent monitor unit check for all treatments. Independent monitor unit verification is practiced in many radiotherapy centres in developed countries around the world. It is mandatory in USA but not yet in Australia. This paper describes development of an independent MU program, concentrating on the implementation of the Enhanced Dynamic Wedge (EDW) component. The difficult case of non centre of field (COF) calculation points under the EDW was studied in some detail. Results of a survey of Australasian centres regarding the use of independent MU check systems is also presented. The system was developed with reference to MU calculations made by Pinnacle 3 D Radiotherapy Treatment Planning (RTP) system (ADAC - Philips) for 4MV, 6MV and 18MV X-ray beams used at the Newcastle Mater Misericordiae Hospital (NMMH) in the clinical environment. A small systematic error was detected in the equation used for the EDW calculations. Results indicate that COF equations may be used in the non COF situation with similar accuracy to that achieved with profile corrected methods. Further collaborative work with other centres is planned to extend these findings

  5. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  6. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  7. Changes in Default Alarm Settings and Standard In-Service are Insufficient to Improve Alarm Fatigue in an Intensive Care Unit: A Pilot Project.

    Science.gov (United States)

    Sowan, Azizeh Khaled; Gomez, Tiffany Michelle; Tarriela, Albert Fajardo; Reed, Charles Calhoun; Paper, Bruce Michael

    2016-01-11

    Clinical alarm systems safety is a national concern, specifically in intensive care units (ICUs) where alarm rates are known to be the highest. Interventional projects that examined the effect of changing default alarm settings on overall alarm rate and on clinicians' attitudes and practices toward clinical alarms and alarm fatigue are scarce. To examine if (1) a change in default alarm settings of the cardiac monitors and (2) in-service nursing education on cardiac monitor use in an ICU would result in reducing alarm rate and in improving nurses' attitudes and practices toward clinical alarms. This quality improvement project took place in a 20-bed transplant/cardiac ICU with a total of 39 nurses. We implemented a unit-wide change of default alarm settings involving 17 parameters of the cardiac monitors. All nurses received an in-service education on monitor use. Alarm data were collected from the audit log of the cardiac monitors 10 weeks before and 10 weeks after the change in monitors' parameters. Nurses' attitudes and practices toward clinical alarms were measured using the Healthcare Technology Foundation National Clinical Alarms Survey, pre- and postintervention. Alarm rate was 87.86 alarms/patient day (a total of 64,500 alarms) at the preintervention period compared to 59.18 alarms/patient day (49,319 alarms) postintervention (P=.01). At baseline, Arterial Blood Pressure (ABP), Pair Premature Ventricular Contractions (PVCs), and Peripheral Capillary Oxygen Saturation (SpO2) alarms were the highest. ABP and SpO2 alarms remained among the top three at the postproject period. Out of the 39 ICU nurses, 24 (62%) provided complete pre- and postproject survey questionnaires. Compared to the preintervention survey, no remarkable changes in the postproject period were reported in nurses' attitudes. Themes in the narrative data were related to poor usability of cardiac monitors and the frequent alarms. The data showed great variation among nurses in terms of changing

  8. AFSC/ABL: Southeast Coastal Monitoring Project - CTD database

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Southeast Alaska Coastal Monitoring (SECM) project in Alaska was initiated in 1997 by the Auke Bay Laboratory, National Marine Fisheries Service, to study the...

  9. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports

  10. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    Science.gov (United States)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  11. Exchange sex among people receiving medical care for HIV in the United States - medical monitoring project 2009-2013.

    Science.gov (United States)

    Olaiya, Oluwatosin; Nerlander, Lina; Mattson, Christine L; Beer, Linda

    2018-04-20

    Many studies of persons who exchange sex for money or drugs have focused on their HIV acquisition risk, and are often limited to select populations and/or geographical locations. National estimates of exchange sex among people living with HIV (PLWH) who are in medical care, and its correlates, are lacking. To address these gaps, we analyzed data from the Medical Monitoring Project, a surveillance system that produces nationally representative estimates of behavioral and clinical characteristics of PLWH receiving medical care in the United States, to estimate the weighted prevalence of exchange sex overall, and by selected socio-demographic, behavioral and clinical characteristics. We found 3.6% of sexually active adults reported exchange sex in the past 12 months. We found a higher prevalence of exchange sex among transgender persons, those who experienced homelessness, and those with unmet needs for social and medical services. Persons who exchanged sex were more likely to report depression and substance use than those who did not exchange sex. We found a higher prevalence of sexual behaviors that increase the risk of HIV transmission and lower viral suppression among persons who exchanged sex. PLWH who exchanged sex had a higher prevalence of not being prescribed ART, and not being ART adherent than those who did not exchange sex. We identify several areas for intervention, including: provision of or referral to services for unmet needs (such as housing or shelter), enhanced delivery of mental health and substance abuse screening and treatment, risk-reduction counseling, and ART prescription and adherence support services.

  12. Acoustic monitoring systems tests at Indian Point Unit 1. Final report

    International Nuclear Information System (INIS)

    Smith, J.R.; Rao, G.V.; Craig, J.

    1979-12-01

    This report describes the results of a program to test acoustic monitoring systems on Indian Point Unit No. 1 under actual plant operating conditions, less the reactor core. The two types of systems evaluated were the monitoring of acoustic emissions generated by growing flaws and the monitoring of acoustic signals from leaks

  13. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  14. Developed vibration waveform monitoring unit for CBM

    International Nuclear Information System (INIS)

    Hamada, T.; Hotsuta, K.; Hirose, I.; Morita, E.

    2007-01-01

    In nuclear power plants, many rotating machines such as pumps and fans are in use. Shikoku Research Institute Inc. has recently developed easy-to-use tools to facilitate the maintenance of such equipment. They include a battery-operated vibration waveform monitoring unit which allows unmanned vibration monitoring on a regular basis and data collection even from intermittently operating equipment, a waveform data collector which can be used for easy collection, storage, control, and analysis of raw vibration waveform data during normal operation, and vibration analysis and evaluation tools. A combination of these tools has a high potential for optimization of rotating equipment maintenance. (author)

  15. Emergency radiological monitoring and analysis United States Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Thome, D.J.

    1994-01-01

    The United States Federal Radiological Emergency Response Plan (FRERP) provides the framework for integrating the various Federal agencies responding to a major radiological emergency. Following a major radiological incident the FRERP authorizes the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC). The FRMAC is established to coordinate all Federal agencies involved in the monitoring and assessment of the off-site radiological conditions in support of the impacted states and the Lead Federal Agency (LFA). Within the FRMAC, the Monitoring and Analysis Division is responsible for coordinating all FRMAC assets involved in conducting a comprehensive program of environmental monitoring, sampling, radioanalysis and quality assurance. This program includes: (1) Aerial Radiological Monitoring - Fixed Wing and Helicopter, (2) Field Monitoring and Sampling, (3) Radioanalysis - Mobile and Fixed Laboratories, (4) Radiation Detection Instrumentation - Calibration and Maintenance, (5) Environmental Dosimetry, and (6) An integrated program of Quality Assurance. To assure consistency, completeness and the quality of the data produced, a methodology and procedures handbook is being developed. This paper discusses the structure, assets and operations of FRMAC monitoring and analysis and the content and preparation of this handbook

  16. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Rick Findlay

    2006-09-01

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation.

  17. Learning from case studies and monitoring of Dutch tunnel projects

    NARCIS (Netherlands)

    Korff, M.

    2017-01-01

    Individuals and project-based organisations in the construction industry can learn in a (more) systematic way from case studies and the monitoring of underground construction works. Underground construction projects such as tunnels and excavations suffer as much or more from failure costs

  18. Microphone variability and degradation: implications for monitoring programs employing autonomous recording units

    Directory of Open Access Journals (Sweden)

    Patrick J. Turgeon

    2017-06-01

    Full Text Available Autonomous recording units (ARUs are emerging as an effective tool for avian population monitoring and research. Although ARU technology is being rapidly adopted, there is a need to establish whether variation in ARU components and their degradation with use might introduce detection biases that would affect long-term monitoring and research projects. We assessed whether microphone sensitivity impacted the probability of detecting bird vocalizations by broadcasting a sequence of 12 calls toward an array of commercially available ARUs equipped with microphones of varying sensitivities under three levels (32 dBA, 42 dBA, and 50 dBA of experimentally induced noise conditions selected to reflect the range of noise levels commonly encountered during avian surveys. We used binomial regression to examine factors influencing probability of detection for each species and used these to examine the impact of microphone sensitivity on the effective detection area (ha for each species. Microphone sensitivity loss reduced detection probability for all species examined, but the magnitude of the effect varied between species and often interacted with distance. Microphone sensitivity loss reduced the effective detection area by an average of 25% for microphones just beyond manufacturer specifications (-5 dBV and by an average of 66% for severely compromised microphones (-20 dBV. Microphone sensitivity loss appeared to be more problematic for low frequency calls where reduction in the effective detection area occurred most rapidly. Microphone degradation poses a source of variation in avian surveys made with ARUs that will require regular measurement of microphone sensitivity and criteria for microphone replacement to ensure scientifically reproducible results. We recommend that research and monitoring projects employing ARUs test their microphones regularly, replace microphones with declining sensitivity, and record sensitivity as a potential covariate in

  19. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  20. Forest health monitoring in the United States: focus on national reports

    Science.gov (United States)

    Kurt Riitters; Kevin Potter

    2013-01-01

    The health and sustainability of United States forests have been monitored for many years from several different perspectives. The national Forest Health Monitoring (FHM) Program was established in 1990 by Federal and State agencies to develop a national system for monitoring and reporting on the status and trends of forest ecosystem health. We describe and illustrate...

  1. Monitoring as component for the decision making in final repository projects; Monitoring als Baustein fuer die Entscheidungsfindung in Endlagerprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Kallenbach-Herbert, Beate; Alt, Stefan [Oeko-Institut e.V., Darmstadt (Germany)

    2012-12-15

    The monitoring in final radioactive waste repositories is performed by continuous or repeated measurements of technical and geologic parameters during long time periods. The collected data serve manifold purposes. The central focus is to provide fundamental information for the decision between and within the three phases of a final repository project. This means that monitoring is not only the sum of technical surveillance measures. Monitoring is also important for several sociopolitical decisions, for instance in case of closure of the repository. The article discusses possible objectives and shows the relevant technical aspects that are used deduce the requirements for an integrated monitoring concept. It is shown that a monitoring concept should be developed early enough involving all groups that are concerned by the waste disposal project.

  2. Transport Infrastructure Surveillance and Monitoring by Electromagnetic Sensing: The ISTIMES Project

    Directory of Open Access Journals (Sweden)

    Marie Bost

    2010-11-01

    Full Text Available The ISTIMES project, funded by the European Commission in the frame of a joint Call “ICT and Security” of the Seventh Framework Programme, is presented and preliminary research results are discussed. The main objective of the ISTIMES project is to design, assess and promote an Information and Communication Technologies (ICT-based system, exploiting distributed and local sensors, for non-destructive electromagnetic monitoring of critical transport infrastructures. The integration of electromagnetic technologies with new ICT information and telecommunications systems enables remotely controlled monitoring and surveillance and real time data imaging of the critical transport infrastructures. The project exploits different non-invasive imaging technologies based on electromagnetic sensing (optic fiber sensors, Synthetic Aperture Radar satellite platform based, hyperspectral spectroscopy, Infrared thermography, Ground Penetrating Radar-, low-frequency geophysical techniques, Ground based systems for displacement monitoring. In this paper, we show the preliminary results arising from the GPR and infrared thermographic measurements carried out on the Musmeci bridge in Potenza, located in a highly seismic area of the Apennine chain (Southern Italy and representing one of the test beds of the project.

  3. A real-time stack radioactivity monitoring system and dose projection program

    Energy Technology Data Exchange (ETDEWEB)

    Hull, A.P.; Michael, P.A. [Brookhaven National Laboratory, Upton, NY (United States); Bernstein, H.J. [Bernstein & Sons, Bellport, NY (United States)

    1995-02-01

    At Brookhaven National Laboratory, a commercial Low- and High-Range Air Effluent Monitor has become operational at the 60 Mw (t) High Flux Beam Reactor. Its output data is combined with that from ground-level and elevated meteorological sensors to provide a real-time projection of the down-wind dose rates from noble gases and radioiodines released from the HFBR`s 100 m stack. The output of the monitor, and the meteorological sensors and the dose projections can be viewed at emergency response terminals located in the Reactor Control Room, its Technical Support Center and at the laboratory`s separately located Meteorological Station and Monitoring and Assessment Center.

  4. Project W-058 monitor and control system logic

    International Nuclear Information System (INIS)

    ROBERTS, J.B.

    1999-01-01

    This supporting document contains the printout of the control logic for the Project W-058 Monitor and Control System, as developed by Programmable Control Services, Inc. The logic is arranged in five appendices, one for each programmable logic controller console

  5. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    Energy Technology Data Exchange (ETDEWEB)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.

  6. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    International Nuclear Information System (INIS)

    GREENE, G.A.; GUPPY, J.G.

    1998-01-01

    This is the final report on the INSP project entitled, ''Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install and make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant

  7. Radiation control in the core shroud replacement project of Fukushima-Daiichi NPS Unit no.2

    International Nuclear Information System (INIS)

    Kokubun, Yasunori; Haraguchi, Kazuyuki; Yoshizawa, Yuji; Yamada, Yasuo

    2000-01-01

    In Fukushima-Daiichi NPS Unit no.2, the core shroud replacement was made following that of Unit no.3. This project involves replacement of wide-ranging equipment, with the project extending over a long period of time. This was expected to increase the dose equivalent of workers. Accordingly, various measures to lower the dose equivalent were planned and implemented. We outline radiation controls implemented during the project period. The shroud replacement project was a preventive maintenance project which consisted of replacing the core shroud and other internals with those less susceptible to stress corrosion cracking. Problems related to radiation control during the replacement project of Unit no.3 the year before last were summarized. We studied, planned, and implemented measures to be reflected in the project for Unit no.2. This was done to lower the dose equivalent as much as possible while paying due attention to safety and economy. For radiation control during the project for Unit no.2, experiments with Unit no.3 were fully exploited and any effective measures taken at that time were adopted in this project. Problems pointed out after that project with Unit no.3 resulted in new or improved measures being taken with Unit no.2. Measures taken over from the project with Unit no.3; a. Daily analysis of difference between expected and actual dose equivalents b. Dose reduction measures, chemical decontamination, temporary shield, flushing, etc.; New or improved measures; a. Dose reduction measures: Mechanical removal of radiation sources, strengthening of shield, etc.; b. Automatic remote control system; c. Use of new protective devices. With measures implemented as described above, the dose equivalent during shroud replacement of Unit no.2 was reduced by about 30% when compared with that (11.5 persons · Sv) in the case of Unit no.3. Implemented radiation controls will be checked and reviewed in future for reflection in projects with other units. (author)

  8. Condition monitoring of primary coolant pump-motor units of Indian PHWR

    International Nuclear Information System (INIS)

    Rshikesan, P.B.; Sharma, S.S.; Mhetre, S.G.

    1994-01-01

    As the primary coolant pump motor units are located in shut down accessible area, their start up, satisfactory operation and shut down are monitored from control room. As unavailability of one pump in standardised 220 MWe station reduces the station power to about 110 MWe, satisfactory operation of the pump is also important from economic considerations. All the critical parameters of pump shaft, mechanical seal, bearing system, motor winding and shaft displacement (vibrations) are monitored/recorded to ensure satisfactory operation of critical, capital intensive pump-motor units. (author). 2 tabs., 1 fig

  9. Metro Multnomah Wetlands - Multnomah Channel Wetland Restoration Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Multnomah Channel Wetland Restoration Monitoring Project characterizes wetlands use by juvenile salmonids and other fishes in the Multnomah Channel Marsh Natural...

  10. MONDO Project: real time ocean monitoring through Lagrangian drifters during offshore drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Mafra, Tatiana [Eni Oil do Brasil, Rio de Janeiro, RJ (Brazil); Fragoso, Mauricio da Rocha; Santos, Francisco Alves dos; Cruz, Leonardo M. Marques A.; Pellegrini, Julio A.C.; Cerrone, Bruna Nogueira [Prooceano, Rio de Janeiro, RJ (Brazil); Assireu, Arcilan Trevenzoli [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos, SP (Brazil)

    2008-07-01

    Monitoring the ocean conditions during offshore operations is essential for both operational and environmental aspects. Environmentally, not only to know better the environment where the activity is taking place, but also to be able to provide fast and accurate response in case of accidents. MONDO Project (Monitoring by Ocean Drifters) is a pioneer initiative from ENI Oil do Brasil and PROOCEANO that aimed to monitor currents as a part of a metoceanographic data monitoring project of drilling operations in Brazilian Waters, in Santos Basin throughout September to November 2007, 40 satellite tracked ocean drifters were deployed will be transmitting data up to November 2008. The results of this project can be used to study a wide range of subjects about ocean dynamics. Following the principles of social and environmental responsibility, MONDO Project aims to benefit the local ecosystem in increasing the scientific knowledge of the area to calibrate hydrodynamic models that will lead to more accurate modeling results and, as a consequence, to a better management of contingency plans. Based on these principles, the project will also provide unrestricted access to oceanographic data even after the end of operations. (author)

  11. Geothermal resource areas database for monitoring the progress of development in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, J.D.; Lepman, S.R.; Leung, K.; Phillips, S.L.

    1981-01-01

    The Geothermal Resource Areas Database (GRAD) and associated data system provide broad coverage of information on the development of geothermal resources in the United States. The system is designed to serve the information requirements of the National Progress Monitoring System. GRAD covers development from the initial exploratory phase through plant construction and operation. Emphasis is on actual facts or events rather than projections and scenarios. The selection and organization of data are based on a model of geothermal development. Subjects in GRAD include: names and addresses, leases, area descriptions, geothermal wells, power plants, direct use facilities, and environmental and regulatory aspects of development. Data collected in the various subject areas are critically evaluated, and then entered into an on-line interactive computer system. The system is publically available for retrieval and use. The background of the project, conceptual development, software development, and data collection are described here. Appendices describe the structure of the database in detail.

  12. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  13. Skagit IMW - Skagit River Estuary Intensively Monitored Watershed Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study evaluates system-level effects of several estuary restoration projects on juvenile Chinook salmon production in the Skagit River estuary. The monitoring...

  14. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P. M.

    2001-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6)

  15. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P.

    2000-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (CRWMS M and O 2000b) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) engineering design basis in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The engineering design basis documented in the PDD is to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the engineering design basis from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the engineering design basis captured in the SDDs and the design requirements captured in U.S. Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 2-1, the MGR Architecture (Section 4.1),the Engineering Design Bases (Section 5), and the Controlled Project Assumptions (Section 6)

  16. Fiscal Year 2005 Integrated Monitoring Plan for the Hanford Groundwater Performance Assessment Project

    International Nuclear Information System (INIS)

    Rieger, JoAnne T.; Hartman, Mary J.

    2005-01-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various purposes, but sampling is coordinated and data are shared among users. DOE manages these activities through the Hanford Groundwater Performance Assessment Project, which is the responsibility of Pacific Northwest National Laboratory. The groundwater project integrates monitoring for various objectives into a single sampling schedule to avoid redundancy of effort and to improve efficiency of sample collection.This report documents the purposes and objectives of groundwater monitoring at the DOE Hanford Site in southeastern Washington State

  17. Nearshore and offshore environmental effects monitoring at the Sable Offshore Energy project

    International Nuclear Information System (INIS)

    Hurley, G. V.

    2000-01-01

    A monitoring program to determine whether any temporary or permanent environmental perturbations may be attributable to the Sable offshore gas pipeline project as it approaches landfall at Goldboro through an outer bay is discussed, This nearshore region is an active fishing region for the residents of Goldboro, hence the concern about possible contamination. The monitoring project began with a baseline study, followed by monitoring the construction and the recovery period following construction, to ensure that any persistent changes to the nearshore aquatic environment were documented. The monitoring study included representatives of the fishing community to ensure that concerns are addressed early and on a continuing basis. At various phases of the project water properties,sediment modelling, the effects of construction on sea bottom conditions, benthic biota and cultivated mussels, water quality, phytoplankton, and resuspension of toxic cysts, terns and other seabirds were studied. Monitoring programs were also established for sea urchins and mussels, two important commercial species. Commercial-sized sea urchins showed a decrease of 60 per cent between 1998 and 1999 (i.e. the construction period). Recovery of sea urchin population in the immediate trench region will be the special focus of the post-construction monitoring phase. Mussel spat settlement and mussel tissue condition, lobster trapping, water properties, and bird behaviour showed no measurable changes during construction monitoring. In addition to these studies there is an ongoing offshore monitoring program in effect by Sable Offshore Energy Inc., put in place as a condition of approval of its Development Plan by the Canada-Nova Scotia Offshore Petroleum Board. This program monitors attributes such as water quality, suspended particulate matter in the benthic boundary layer, sediment quality, the benthic habitat and megafaunal community, shellfish body burden and taint, marine mammals and seabirds

  18. Bangladesh Agro-Climatic Environmental Monitoring Project

    Science.gov (United States)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  19. Portable and fixed monitoring units for tank calibrations and monitoring of process liquids

    International Nuclear Information System (INIS)

    Landat, D.A.; Hunt, B.A.

    1999-01-01

    The development work stems from safeguards support activities carried out at the JRC Ispra, Italy to the inspectorate agencies. A range of measurement equipment covering the needs of the inspector have been designed, developed and tested in both the laboratory and in nuclear facilities. The instruments comprise four units: (1) a portable pressure measurement device, (2) a volume long term monitoring device, (3) an unattended volume measurement system and (4) a level measurement unit. Utilization of the equipment has proven to give independent measurement checks and confirmation of operator's instrumentation and declarations, ensuring continuity of knowledge. (J.P.N.)

  20. Global Radiological Source Sorting, Tracking, and Monitoring Project: Phase I Final Report

    International Nuclear Information System (INIS)

    Walker, Randy M.; Hill, David E.; Gorman, Bryan L.

    2010-01-01

    As a proof of concept tested in an operational context, the Global Radiological Source Sorting, Tracking, and Monitoring (GRadSSTraM) Project successfully demonstrated that radio frequency identification (RFID) and Web 2.0* technologies can be deployed to track controlled shipments between the United States and the European Union. Between November 2009 and May 2010, a total of 19 shipments were successfully shipped from Oak Ridge National Laboratory (ORNL) by the U.S. Postal Service (USPS) and tracked to their delivery at England's National Physical Laboratory (NPL) by the United Kingdom Royal Mail. However, the project can only be viewed as a qualified success as notable shortcomings were observed. Although the origin and terminus of all RFID-enabled shipments were recorded and no shipments were lost, not all the waypoints between ORNL and NPL were incorporated into the pilot. Given limited resources, the project team was able to install RFID listeners/actuators at three waypoints between the two endpoints. Although it is likely that all shipments followed the same route between ORNL and NPL, it cannot be determined beyond question that all 19 shipments were routed on identical itineraries past the same three waypoints. The pilot also raises the distinct possibility that unattended RFID tracking alone, without positive confirmation that a tagged item has been properly recorded by an RFID reader, does not meet a rigorous standard for shipping controlled items. Indeed, the proof of concept test strongly suggests that a multifaceted approach to tracking may be called for, including tracking methods that are capable of reading and accepting multiple inputs for individual items (e.g., carrier-provided tracking numbers, Universal Product Codes (UPCs), and RFID tags). For controlled items, another apparent requirement is a confirmation feature, human or otherwise, which can certify that an item's RFID tag, UPC, or tracking number has been recorded.

  1. A method for projecting full-scale performance of CO/sub 2/ flooding in the Willard Unit

    International Nuclear Information System (INIS)

    Bilhartz, H.L.; Charlson, G.S.; Stalkup, F.I.; Miller, C.C.

    1985-01-01

    A non-producing CO/sub 2/ flood tertiary recovery test was recently completed in the Willard Unit of Wasson Field. Flood responses during waterflood and alternate injection of CO/sub 2/ and water were monitored at a logging observation well using compensated neutron and pulsed neutron logs. A pressure core was taken to measure residual oil saturations at the test conclusion. The overall objective of the testing was to obtain information for evaluating the potential for full-scale CO/sub 2/ flooding in the unit. Out method for making this evaluation involves: (1) defining CO/sub 2/ flood displacement efficiency and representing this efficiency in a miscible flood reservoir simulator; (2) defining a representative average reservoir description; and (3) projecting full-scale CO/sub 2/ flood performance with the simulator. The paper provides a status report on progress to assess CO/sub 2/ flooding potential for the Willard Unit in this manner

  2. Status and understanding of groundwater quality in the Northern Coast Ranges study unit, 2009: California GAMA Priority Basin Project

    Science.gov (United States)

    Mathany, Timothy M.; Belitz, Kenneth

    2015-01-01

    Groundwater quality in the 633-square-mile (1,639-square-kilometer) Northern Coast Ranges (NOCO) study unit was investigated as part of the Priority Basin Project (PBP) of the Groundwater Ambient Monitoring and Assessment (GAMA) Program and the U.S. Geological Survey (USGS) National Water-Quality Assessment Program. The study unit is composed of two study areas (Interior Basins and Coastal Basins) and is located in northern California in Napa, Sonoma, Lake, Colusa, Mendocino, Glenn, Humboldt, and Del Norte Counties. The GAMA-PBP is being conducted by the California State Water Resources Control Board in collaboration with the USGS and the Lawrence Livermore National Laboratory.

  3. Hearth monitoring project annual report for FY-1981

    International Nuclear Information System (INIS)

    Nieschmidt, E.B.; Lawrence, R.S.

    1981-08-01

    Progress during FY 1981 in the Hearth Monitoring project for the Idaho National Engineering Laboratory Transuranic Waste Treatment Facility is reported. Results of calculational, experimental and instrumental phases of the program are presented. Recommendations and plans for continuation of the program are displayed. Schedules for future efforts are included

  4. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    Energy Technology Data Exchange (ETDEWEB)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

  5. Project characteristics monitoring report: BWIP [Basalt Waste Isolation Program] repository project

    International Nuclear Information System (INIS)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs

  6. A maintenance policy for two-unit parallel systems based on imperfect monitoring information

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Anne [Department Genie des Systems Industiels (GSI), Universite de technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes, Cedex (France)]. E-mail: anne.barros@utt.fr; Berenguer, Christophe [Department Genie des Systems Industiels (GSI), Universite de technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes, Cedex (France); Grall, Antoine [Department Genie des Systems Industiels (GSI), Universite de technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes, Cedex (France)

    2006-02-01

    In this paper a maintenance policy is optimised for a two-unit system with a parallel structure and stochastic dependences. Monitoring problems are taken into account in the optimisation scheme: the failure time of each unit can be not detected with a given probability. Conditions on the system parameters (unit failure rates) and on the non-detection probabilities must be verified to make the optimisation scheme valid. These conditions are clearly identified. Numerical experiments allow to show the relevance of taking into account monitoring problems in the maintenance model.

  7. A maintenance policy for two-unit parallel systems based on imperfect monitoring information

    International Nuclear Information System (INIS)

    Barros, Anne; Berenguer, Christophe; Grall, Antoine

    2006-01-01

    In this paper a maintenance policy is optimised for a two-unit system with a parallel structure and stochastic dependences. Monitoring problems are taken into account in the optimisation scheme: the failure time of each unit can be not detected with a given probability. Conditions on the system parameters (unit failure rates) and on the non-detection probabilities must be verified to make the optimisation scheme valid. These conditions are clearly identified. Numerical experiments allow to show the relevance of taking into account monitoring problems in the maintenance model

  8. Requirements for internal contamination monitoring units

    International Nuclear Information System (INIS)

    Werner, E.; Beyer, D.; Doerfel, H.; Erlenbach, H.; Fischbach, G.; Henrichs, K.; Keller, K.D.; Koenig, K.; Riedel, W.; Scheler, R.; Schieferdecker, H.

    1994-01-01

    For the evaluation of internal contamination by officially authorized monitoring units according to section 63 (6) of the German radiation protection ordinance, a directive will be prepared in order to define uniform requirements for the laboratories in charge of incorporation monitoring by appointment of the relevant authorities. These requirements refer to equipment, to performance of measurements, to interpretation of measured values, to quality control as well as to documentation and to delivery of results. The duties of such laboratories comprise measurements of radioactivity, evaluation of intakes of radionuclides and of the resulting internal radiation dose, but also transmission of results to the employer, to the central dose registry, and under certain circumstances to the authorities. Among the requirements to be met by the laboratory for incorporation control are a sufficient measuring efficiency, the implementation of in-house checks, and the participation in intercomparison programs. For the accomplishment of such duties the laboratory needs appropriate apparatus, rooms, facilities, and staffing. (orig.) [de

  9. Monitoring of Space and Earth electromagnetic environment by MAGDAS project: Collaboration with IKIR - Introduction to ICSWSE/MAGDAS project

    Directory of Open Access Journals (Sweden)

    Yoshikawa Akimasa

    2017-01-01

    Full Text Available For study of coupling processes in the Solar-Terrestrial System, International Center for Space Weather Science and Education (ICSWSE, Kyushu University has developed a real time magnetic data acquisition system (the MAGDAS project around the world. The number of observational sites is increasing every year with the collaboration of host countries. Now at this time, the MAGDAS Project has installed 78 real time magnetometers – so it is the largest magnetometer array in the world. The history of global observation at Kyushu University is over 30 years and number of developed observational sites is over 140. Especially, Collaboration between IKIR is extended back to 1990's. Now a time, we are operating Flux-gate magnetometer and FM-CW Radar. It is one of most important collaboration for space weather monitoring. By using MAGDAS data, ICSWSE produces many types of space weather index, such as EE-index (for monitoring long tern and shot term variation of equatorial electrojet, Pc5 index (for monitoring solar-wind velocity and high energy electron flux, Sq-index (for monitoring global change of ionospheric low and middle latitudinal current system, and Pc3 index (for monitoring of plasma density variation at low latitudes. In this report, we will introduce recent development of MAGDAS/ICSWSE Indexes project and topics for new open policy for MAGDAS data will be also discussed.

  10. Monitoring of Space and Earth electromagnetic environment by MAGDAS project: Collaboration with IKIR - Introduction to ICSWSE/MAGDAS project

    Science.gov (United States)

    Yoshikawa, Akimasa; Fujimoto, Akiko; Ikeda, Akihiro; Uozumi, Teiji; Abe, Shuji

    2017-10-01

    For study of coupling processes in the Solar-Terrestrial System, International Center for Space Weather Science and Education (ICSWSE), Kyushu University has developed a real time magnetic data acquisition system (the MAGDAS project) around the world. The number of observational sites is increasing every year with the collaboration of host countries. Now at this time, the MAGDAS Project has installed 78 real time magnetometers - so it is the largest magnetometer array in the world. The history of global observation at Kyushu University is over 30 years and number of developed observational sites is over 140. Especially, Collaboration between IKIR is extended back to 1990's. Now a time, we are operating Flux-gate magnetometer and FM-CW Radar. It is one of most important collaboration for space weather monitoring. By using MAGDAS data, ICSWSE produces many types of space weather index, such as EE-index (for monitoring long tern and shot term variation of equatorial electrojet), Pc5 index (for monitoring solar-wind velocity and high energy electron flux), Sq-index (for monitoring global change of ionospheric low and middle latitudinal current system), and Pc3 index (for monitoring of plasma density variation at low latitudes). In this report, we will introduce recent development of MAGDAS/ICSWSE Indexes project and topics for new open policy for MAGDAS data will be also discussed.

  11. 40 CFR 60.1320 - How do I monitor the load of my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... municipal waste combustion unit? 60.1320 Section 60.1320 Protection of Environment ENVIRONMENTAL PROTECTION... of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After... Monitoring Requirements § 60.1320 How do I monitor the load of my municipal waste combustion unit? (a) If...

  12. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Harris, Robin; King, Marty [Confederated Tribes of the Umatilla Indian Reservation

    2009-06-10

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho

  13. Zinc injection on the EDF fleet monitoring the injection on 12 units

    International Nuclear Information System (INIS)

    Le-Meur, Gaelle Harmand; Anne-Marie; Stutzmann, Agnes; Taunier, Stephane; Benfarah, Moez; Bretelle, Jean-Luc; Alain, Rocher; Claeys, Myriam; Bonne, Sebastien

    2012-09-01

    After a first implementation of zinc injection at Bugey 2 and Bugey 4, EDF decided to extend the program to other units of its fleet. 14 more reactors from the French fleet of 58 were chosen in order to - Reduce the radiation sources for curative or preventive (after SGR) reasons - Mitigate stress corrosion cracking on nickel alloys and reduce the rate of generalized corrosion - Prevent the risk of CIPS, mainly after a fuel management change. Zinc injection started on 9 new units in 2011, 1 unit in 2012 and will be extended to 4 other units before the end of 2013. To monitor the injection, EDF has defined a complete program concerning chemistry, radiation protection (dose rate and deposited activities measurements), materials (statistical analysis of SG tube cracks), fuel (oxide measurements) and waste (radiochemical characterization of filters). Reference units were chosen for each field because of the size of the fleet. This paper will detail the different monitoring programs on the EDF plants injecting zinc. (authors)

  14. Handbook to guide the measurement and monitoring of project effectiveness and impact

    Energy Technology Data Exchange (ETDEWEB)

    1986-09-15

    This handbook demonstrates the application of a tool for measuring and monitoring the impact of a development project in the Department of Quezaltenango, Guatemala. That project itself presently is a demonstration. It explores the technical feasibility and the commercial possibilities of direct geothermal heat applications to the processing of agricultural produce - with the eventual purpose of expanding agricultural exports from Guatemala. The handbook focuses on an early stage of the geothermal initiative and guides preparations for future impact measurement and monitoring of geothermal projects. Primarily, guidance is for projects in agricultural applications of geothermal heat - and basically in Quezaltenango. But the exercise and the handbook are relevant in broad outline to other, industrial applications projects as well which may be based in other departments and have immediate impact across the whole country. This handbook attempts to prepare geothermal energy planners in Guatemala for that juncture when geothermal projects can be managed by objectives. It promotes and facilitates thinking about defining specific objectives for projects that result from the demonstration at Zunil (in Quezaltenango Department); and it prompts preparations for obtaining baseline measurements and for making rational projections on the achievements of future projects.

  15. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  16. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  17. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  18. EGNOS Monitoring Prepared in Space Research Centre P.A.S. for SPMS Project

    Science.gov (United States)

    Swiatek, Anna; Jaworski, Leszek; Tomasik, Lukasz

    2017-12-01

    The European Geostationary Overlay Service (EGNOS) augments Global Positioning System (GPS) by providing correction data and integrity information for improving positioning over Europe. EGNOS Service Performance Monitoring Support (SPMS) project has assumed establishment, maintenance and implementation of an EGNOS performance monitoring network. The paper presents preliminary results of analyses prepared in Space Research Centre, Polish Academy of Sciences (Warsaw), as one of partners in SPMS project.

  19. DEVELOPING AND IMPLEMENTING AN ESTUARINE WATER QUALITY MONITORING, ASSESSMENT AND OUTREACH PROGRAM/THE MYSOUND PROJECT

    Science.gov (United States)

    EPA has developed a technology transfer handbook for the EMPACT MYSound Project. The handbook highlights information and monitoring technologies developed from the EMPACT Long Island Sound Marine Monitoring (MYSound) Project. As part of the MYSound effort, telemetering data-buoys...

  20. Flood effects on an Alaskan stream restoration project: the value of long-term monitoring

    Science.gov (United States)

    Densmore, Roseann V.; Karle, Kenneth F.

    2009-01-01

    On a nationwide basis, few stream restoration projects have long-term programs in place to monitor the effects of floods on channel and floodplain configuration and floodplain vegetation, but long-term and event-based monitoring is required to measure the effects of these stochastic events and to use the knowledge for adaptive management and the design of future projects. This paper describes a long-term monitoring effort (15 years) on a stream restoration project in Glen Creek in Denali National Park and Preserve in Alaska. The stream channel and floodplain of Glen Creek had been severely degraded over a period of 80 years by placer mining for gold, which left many reaches with unstable and incised streambeds without functioning vegetated floodplains. The objectives of the original project, initiated in 1991, were to develop and test methods for the hydraulic design of channel and floodplain morphology and for floodplain stabilization and riparian habitat recovery, and to conduct research and monitoring to provide information for future projects in similar degraded watersheds. Monitoring methods included surveyed stream cross-sections, vegetation plots, and aerial, ground, and satellite photos. In this paper we address the immediate and outlying effects of a 25-year flood on the stream and floodplain geometry and riparian vegetation. The long-term monitoring revealed that significant channel widening occurred following the flood, likely caused by excessive upstream sediment loading and the fairly slow development of floodplain vegetation in this climate. Our results illustrated design flaws, particularly in regard to identification and analysis of sediment sources and the dominant processes of channel adjustment.

  1. Project monitoring and evaluation: an enhancing method for health research system management.

    Science.gov (United States)

    Djalalinia, Shirin; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Peykari, Niloofar

    2014-04-01

    Planning, organizing, staffing, leading and monitoring are the basic functional component of management. In present article, we aim to define the project monitoring and evaluation in health research system (HRS) considering its success and challenges based on our national experience. IN THIS STUDY BASED ON THE INFORMATION OF ANNUAL MEDICAL SCIENCE UNIVERSITIES EVALUATION DURING THE LAST DECADE THE HRS INDICATORS HAVE BEEN SCORED IN THREE AXES BASED ON HRS FUNCTIONS: Stewardship, capacity building and knowledge production. In this article, we will focus on the results of HRS evaluation from 2002 to 2010, also on its success and challenges. In an overall view, the main results are the experiences of the designing and implantation of such process after pre-project preparation, all parts followed under the whole supervision of the aims of the HRS evaluation. Project management light the way of practical application of knowledge, skills, tools and techniques for better HRS evaluation and management. We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  2. Monitoring of ocean storage projects

    Energy Technology Data Exchange (ETDEWEB)

    Caldeira, K. [Energy and Environment Directorate, Lawrence Livermore National Laboratory, Livermore, CA (United States)

    2003-02-01

    It has been proposed that atmospheric CO2 accumulation could be slowed by capture of CO2 from point sources and subsequent storage of that CO2 in the ocean. If applied, such sequestration efforts would need to be monitored for compliance, effectiveness, and unintended consequences. Aboveground inspection and monitoring of facilities and practices, combined with ocean observations, could assure compliance with ocean sequestration guidelines and regulations. Ocean observations could be made using a variety of sensors mounted on moorings or underwater gliders. Long-term effectiveness and leakage to the atmosphere must be estimated from models, since on large spatial scales it will be impossible to observationally distinguish carbon stored by a project from variable concentrations of background carbon. Furthermore, the ocean naturally would absorb roughly 80% of fossil fuel CO2 released to the atmosphere within a millennium. This means that most of the CO2 sequestered in the ocean that leaks out to the atmosphere will be reabsorbed by the ocean. However, there is no observational way to distinguish remaining carbon from reabsorbed carbon. The science of monitoring unintended consequences in the deep ocean interior is at a primitive state. Little is understood about ecosystems of the deep ocean interior; and even less is understood about how those ecosystems would respond to added CO2. High priority research objectives should be (1) to improve our understanding of the natural ecosystems of the deep ocean, and (2) to improve our understanding of the response of these ecosystems to increased oceanic CO2 concentrations and decreased ocean pH.

  3. NASA Ames DEVELOP Interns: Helping the Western United States Manage Natural Resources One Project at a Time

    Science.gov (United States)

    Justice, Erin; Newcomer, Michelle

    2010-01-01

    The western half of the United States is made up of a number of diverse ecosystems ranging from arid desert to coastal wetlands and rugged forests. Every summer for the past 7 years students ranging from high school to graduate level gather at NASA Ames Research Center (ARC) as part of the DEVELOP Internship Program. Under the guidance of Jay Skiles [Ames Research Center (ARC) - Ames DEVELOP Manager] and Cindy Schmidt [ARC/San Jose State University Ames DEVELOP Coordinator] they work as a team on projects exploring topics including: invasive species, carbon flux, wetland restoration, air quality monitoring, storm visualizations, and forest fires. The study areas for these projects have been in Washington, Utah, Oregon, Nevada, Hawaii, Alaska and California. Interns combine data from NASA and partner satellites with models and in situ measurements to complete prototype projects demonstrating how NASA data and resources can help communities tackle their Earth Science related problems.

  4. Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Evan; Mathew, Paul

    2009-04-01

    total of 1120 deficiency-intervention combinations were identified in the course of commissioning the projects described in this report. The most common location of deficiencies was in HVAC equipment (65% of sites), followed by air-handling and distributions systems (59%), cooling plant (29%), heating plants (24%), and terminal units (24%). The most common interventions were adjusting setpoints, modifying sequences of operations, calibration, and various mechanical fixes (each done in about two-thirds of the sites). The normalized rate of occurrence of deficiencies and corresponding interventions ranged from about 0.1/100ksf to 10/100ksf, depending on the issue. From these interventions flowed significant and highly cost-effective energy savings For the MBCx cohort, source energy savings of 22 kBTU/sf-year (10%) were achieved, with a range of 2% to 25%. Median electricity savings were 1.9 kWh/sf-year (9%), with a range of 1% to 17%. Peak electrical demand savings were 0.2 W/sf-year (4%), with a range of 3% to 11%. The aggregate commissioning cost for the 24 projects was $2.9 million. We observed a range of normalized costs from $0.37 to 1.62/sf, with a median value of $1.00/sf for buildings that implemented MBCx projects. Per the program design, monitoring costs as a percentage of total costs are significantly higher in MBCx projects (median value 40%) than typical commissioning projects included in the Meta-analysis (median value of 2% in the commissioning database). Half of the projects were in buildings containing complex and energy-intensive laboratory space, with higher associated costs. Median energy cost savings were $0.25/sf-year, for a median simple payback time of 2.5 years. Significant and cost-effective energy savings were thus obtained. The greatest absolute energy savings and shortest payback times were achieved in laboratory-type facilities. While impacts varied from project to project, on a portfolio basis we find MBCx to be a highly cost-effective means

  5. Hydrocarbons. Independent Learning Project for Advanced Chemistry (ILPAC). Unit O1.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on hydrocarbons is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit is divided into sections dealing with alkanes, alkenes, alkynes, arenes, and several aspects of the petroleum industry. Two experiments, exercises (with answers), and pre- and post-tests are included.…

  6. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Wastewater-Inspection and Monitoring Requirements for Waste Management Units 11 Table 11 to Subpart G of Part 63 Protection of Environment... and Monitoring Requirements for Waste Management Units To comply with Inspection or monitoring...

  7. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd (Washington Department of Fish and Wildlife, Olympia, WA)

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  8. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  9. Project 57 Air Monitoring Report: October 1, 2013, through December 31, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Mizell, Steve A. [Desert Research Inst. (DRI), Las Vegas, NV (United States); Nikolich, George [Desert Research Inst. (DRI), Las Vegas, NV (United States); McCurdy, Greg [Desert Research Inst. (DRI), Reno, NV (United States); Shadel, Craig [Desert Research Inst. (DRI), Las Vegas, NV (United States); Miller, Julianne J. [Desert Research Inst. (DRI), Las Vegas, NV (United States)

    2016-02-01

    On April 24, 1957, the Atomic Energy Commission (AEC, now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley north east of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DoD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a nonnuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DoD. Various radiological surveys have been performed in the area and in 2007, the DOE expanded the demarked contamination area by posting signs 200 to 400 feet (60 to 120 meters) outside of the original fence. Plutonium in soil is thought to attach preferentially to smaller particles. Therefore, redistribution of soil particulates by wind (dust) is the mechanism most likely to transport plutonium beyond the boundary of the Project 57 contamination area. In 2011, DRI installed two instrumentation towers to measure radiological, meteorological, and dust conditions. The monitoring activity was implemented to determine if radionuclide contamination was detectable in samples of airborne dust and characterize meteorological and environmental parameters that influence dust transport. Collected data also permits comparison of radiological conditions at the Project 57 monitoring stations to conditions observed at Community Environmental Monitoring Program (CEMP) stations around the NTTR. Biweekly samples of airborne particulates are submitted for laboratory

  10. Direct Satellite Data Acquisition and its Application for Large -scale Monitoring Projects in Russia

    Science.gov (United States)

    Gershenzon, O.

    2011-12-01

    ScanEx RDC created an infrastructure (ground stations network) to acquire and process remote sensing data from different satellites: Terra, Aqua, Landsat, IRS-P5/P6, SPOT 4/5, FORMOSAT-2, EROS A/B, RADARSAT-1/2, ENVISAT-1. It owns image archives from these satellites as well as from SPOT-2 and CARTOSAT-2. ScanEx RDC builds and delivers remote sensing ground stations (working with up to 15 satellites); and owns the ground stations network to acquire data for Russia and surrounding territory. ScanEx stations are the basic component in departmental networks of remote sensing data acquisition for different state authorities (Roshydromet, Ministry of Natural Recourses, Emercom) and University- based remote sensing data acquisition and processing centers in Russia and abroad. ScanEx performs large-scale projects in collaboration with government agencies to monitor forests, floods, fires, sea surface pollution, and ice situation in Northern Russia. During 2010-2011 ScanEx conducted daily monitoring of wild fires in Russia detecting and registering thermal anomalies using data from Terra, Aqua, Landsat and SPOT satellites. Detailed SPOT 4/5 data is used to analyze burnt areas and to assess damage caused by fire. Satellite data along with other information about fire situation in Russia was daily updated and published via free-access Internet geoportal. A few projects ScanEx conducted together with environmental NGO. Project "Satellite monitoring of Especially Protected Natural Areas of Russia and its results visualization on geoportal was conducted in cooperation with NGO "Transparent World". The project's goal was to observe natural phenomena and economical activity, including illegal, by means of Earth remote sensing data. Monitoring is based on multi-temporal optical space imagery of different spatial resolution. Project results include detection of anthropogenic objects that appeared in the vicinity or even within the border of natural territories, that have never been

  11. International Remote Monitoring Project Embalse Nuclear Power Station, Argentina Embalse Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, Sigfried L.; Glidewell, Donnie D.; Bonino, Anibal; Bosler, Gene; Mercer, David; Maxey, Curt; Vones, Jaromir; Martelle, Guy; Busse, James; Kadner, Steve; White, Mike; Rovere, Luis

    1999-01-01

    The Autoridad Regulatoria Nuclear of Argentina (ARN), the International Atomic Energy Agency (IAEA), ABACC, the US Department of Energy, and the US Support Program POTAS, cooperated in the development of a Remote Monitoring System for nuclear nonproliferation efforts. This system was installed at the Embalse Nuclear Power Station last year to evaluate the feasibility of using radiation sensors in monitoring the transfer of spent fuel from the spent fuel pond to dry storage. The key element in this process is to maintain continuity of knowledge throughout the entire transfer process. This project evaluated the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguard efficiency. New technology has been developed to enhance the design of the system to include storage capability on board sensor platforms. This evaluation has led to design enhancements that will assure that no data loss will occur during loss of RF transmission of the sensors

  12. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  13. Applying EVM principles to Tevatron Beam Position Monitor Project

    International Nuclear Information System (INIS)

    Banerjee, Bakul

    2005-01-01

    At Fermi National Accelerator Laboratory (Fermilab), the Tevatron high energy particle collider must meet the increasing scientific demand of higher beam luminosity. To achieve this higher luminosity goal, U. S. Department of Energy (DOE) sponsored a major upgrade of capabilities of Fermilab's accelerator complex that spans five years and costs over fifty million dollars. Tevatron Beam Position Monitor (BPM) system upgrade is a part of this project, generally called RunII upgrade project. Since the purpose of the Tevatron collider is to detect the smashing of proton and anti-protons orbiting the circular accelerator in opposite directions, capability to detect positions of both protons and antiprotons at a high resolution level is a desirable functionality of the monitoring system. The original system was installed during early 1980s, along with the original construction of the Tevatron. However, electronic technology available in 1980s did not allow for the detection of significantly smaller resolution of antiprotons. The objective of the upgrade project is to replace the existing BPM system with a new system utilizing capabilities of modern electronics enhanced by a front-end software driven by a real-time operating software. The new BPM system is designed to detect both protons and antiprotons with increased resolution of up to an order of magnitude. The new system is capable of maintaining a very high-level of data integrity and system reliability. The system consists of 27 VME crates installed at 27 service buildings around the Tevatron ring servicing 236 beam position monitors placed underground, inside the accelerator tunnel. Each crate consists of a single Timing Generator Fanout module, custom made by Fermilab staff, one MVME processor card running VxWorks 5.5, multiple Echotek Digital Receiver boards complimented by custom made Filter Board. The VxWorks based front-end software communicates with the Main Accelerator Control software via a special

  14. Telephone audit for monitoring stroke unit facilities: a post hoc analysis from PROSIT study.

    Science.gov (United States)

    Candelise, Livia; Gattinoni, Monica; Bersano, Anna

    2015-01-01

    Although several valid approaches exist to measure the number and the quality of acute stroke units, only few studies tested their reliability. This study is aimed at establishing whether the telephone administration of the PROject of Stroke unIt ITaly (PROSIT) audit questionnaire is reliable compared with direct face-to-face interview. Forty-three medical leaders in charge of in-hospital stroke services were interviewed twice using the same PROSIT questionnaire with 2 different modalities. First, the interviewers approached the medical leaders by telephone. Thereafter, they went to the hospital site and performed a direct face-to-face interview. Six independent couples of trained researchers conducted the audit interviews. The degree of intermodality agreement was measured with kappa statistic. We found a perfect agreement for stroke units identification between the 2 different audit modalities (K = 1.00; standard error [SE], 1.525). The agreement was also very good for stroke dedicated beds (K = 1.00; SE, 1.525) and dedicated personnel (K = 1.00; SE, 1.525), which are the 2 components of stroke unit definition. The agreement was lower for declared in use process of care and availability of diagnostic investigations. The telephone audit can be used for monitoring stroke unit structures. It is more rapid, less expensive, and can repeatedly be used at appropriate intervals. However, a reliable description of the process of care and diagnostic investigations indicators should be obtained by either local site audit visit or prospective stroke register based on individual patient data. Copyright © 2015 National Stroke Association. Published by Elsevier Inc. All rights reserved.

  15. 77 FR 33774 - Agency Information Collection Activities: Comment Request; Education and Human Resources Project...

    Science.gov (United States)

    2012-06-07

    ... and Human Resources Project Monitoring Clearance AGENCY: National Science Foundation. ACTION: Notice...). SUPPLEMENTARY INFORMATION: Title of Collection: Education and Human Resources Project Monitoring Clearance. OMB... States and internationally. The Directorate for Education and Human Resources (EHR), a unit within NSF...

  16. Using Landsat imagery to detect, monitor, and project net landscape change

    Science.gov (United States)

    Reker, Ryan R.; Sohl, Terry L.; Gallant, Alisa L.

    2015-01-01

    Detailed landscape information is a necessary component to bird habitat conservation planning. The U.S. Geological Survey (USGS) Earth Resources Observation and Science (EROS) Center has been providing information on the Earth’s surface for over 40 years via the continuous series of Landsat satellites. In addition to operating, processing, and disseminating satellite images, EROS is the home to nationwide and global landscape mapping, monitoring, and projection products, including:National Land Cover Database (NLCD) – the definitive land cover dataset for the U.S., with updates occurring at five-year intervals;Global Land Cover Monitoring – producing 30m resolution global land cover;LANDFIRE – Landscape Fire and Resource Management Planning Tools–EROS is a partner in this joint program between U.S. Department of Agriculture and Department of Interior that produces consistent, comprehensive, geospatial data and databases that describe vegetation, wildland fuel, and fire regimes across the U.S.;Land Cover Trends – a landscape monitoring and assessment effort to understand the rates, trends, causes, and consequences of contemporary U.S. land use and land cover change; andLand Use and Land Cover (LULC) Modeling – a project extending contemporary databases of landscape change forward and backward in time through moderate-resolution land cover projections.

  17. Bruce A units 1 and 2 restart project

    International Nuclear Information System (INIS)

    Routledge, K.

    2006-01-01

    This presentation provides an overview of the Bruce A Units 1 and 2 Restart project from the vantage point of the Project Management Contractor (PMC). The presentation will highlight the unique structure of the project, which has been designed to maximize project efficiencies while minimizing the impact to the Bruce Power operational reactors. Efficiency improvements covered in the presentation includes: support services provided to the direct work contractors, radiation protection, worker protection, engineering, field execution, maintenance and facilities. The presentation focusses on the roles of the PMC in helping to ensure the successful outcome of this ambitious reactor refurbishment project. In addition, the Construction Island concept that has been implemented on the project will be presented, with some of the innovative thinking that has gone into its creation. The organization of the PMC and an overview of the project schedule is also presented. AMEC NCL is a privately held consultancy in the Canadian nuclear industry which provides experienced and flexible multi-disciplined resources to support full project management, engineering solutions and safety consultancy services throughout the life cycle of nuclear facilities in Canada, and for customers in related markets in North America and overseas. AMEC NCL is a wholly-owned subsidiary of AMEC plc

  18. Converter Monitoring Unit for Retrofit of Wind Power Converters

    DEFF Research Database (Denmark)

    Rannestad, Bjorn; Maarbjerg, Anders Eggert; Frederiksen, Kristian

    2018-01-01

    A Converter Monitoring Unit (CMU), which will enable condition monitoring of wind turbine converters is presented in this paper. Reducing the cost of corrective maintenance by means of condition monitoring is a way of lowering Operation & Maintenance (O&M) costs for wind turbine systems....... The CMU must be able to detect a broad range of failure modes related to Insulated Gate Bipolar Transistor (IGBT) power modules and associated gate drives. IGBT collector-emitter on-state voltage (vceon) and current (ic) is sampled in the CMU and used for detection of emerging failures. A new method...... for compensation of unwanted inductive voltage drop in the vceon measurement path is presented, enabling retrofitting of CMUs in existing wind turbines. Finally, experimental results obtained on a prototype CMU are presented. Experimentally the vceon dependency to IGBT junction temperature and deterioration...

  19. Monitor units are not predictive of neutron dose for high-energy IMRT

    Directory of Open Access Journals (Sweden)

    Hälg Roger A

    2012-08-01

    Full Text Available Abstract Background Due to the substantial increase in beam-on time of high energy intensity-modulated radiotherapy (>10 MV techniques to deliver the same target dose compared to conventional treatment techniques, an increased dose of scatter radiation, including neutrons, is delivered to the patient. As a consequence, an increase in second malignancies may be expected in the future with the application of intensity-modulated radiotherapy. It is commonly assumed that the neutron dose equivalent scales with the number of monitor units. Methods Measurements of neutron dose equivalent were performed for an open and an intensity-modulated field at four positions: inside and outside of the treatment field at 0.2 cm and 15 cm depth, respectively. Results It was shown that the neutron dose equivalent, which a patient receives during an intensity-modulated radiotherapy treatment, does not scale with the ratio of applied monitor units relative to an open field irradiation. Outside the treatment volume at larger depth 35% less neutron dose equivalent is delivered than expected. Conclusions The predicted increase of second cancer induction rates from intensity-modulated treatment techniques can be overestimated when the neutron dose is simply scaled with monitor units.

  20. Design and accomplishment for the monitoring unit of the sup 6 sup 0 Co train freight inspection system

    CERN Document Server

    Cong Peng

    2002-01-01

    The sup 6 sup 0 Co railway cargo inspection system has super automaticity. And the monitoring unit is an important part of the automatic control system. The author introduces the idea of designing the monitoring unit in detail and accomplishes a new-style unit which is different from the traditional one. The monitoring unit which is highly integrated, easy to be mounted and debugged and convenient to be operated and maintained has play an excellent role in the work of the whole inspection system

  1. A microcontroller based readout unit for a smart personnel monitoring TLD badge

    International Nuclear Information System (INIS)

    Gaonkar, U.P.; Kulkarni, M.S.; Kannan, S.

    1997-01-01

    An automated TLD personnel monitoring system is under development to cope up with the requirements of personnel monitoring of rapidly growing number of radiation workers. The core of the system is a smart TLD badge incorporating a memory device and a microcontroller based readout unit for reading the memory contents of the badge. The memory is used to store personnel data including the accumulated dose data. The reader unit has a serial RS 232C interface for connection to a PC for entering/modifying data in the memory. A password protected software has also been developed in C for entering/modifying the data in the single memory. 3 figs

  2. Exploding Head Syndrome in the Epilepsy Monitoring Unit: Case Report and Literature Review.

    Science.gov (United States)

    Gillis, Kara; Ng, Marcus C

    2017-01-01

    Diagnosis of paroxysmal events in epilepsy patients is often made through video-telemetry electroencephalography in the epilepsy monitoring unit. This case report describes the first-ever diagnosis of exploding head syndrome in a patient with longstanding epilepsy and novel nocturnal events. In this report, we describe the presentation of exploding head syndrome and its prevalence and risk factors. In addition, the prevalence of newly diagnosed sleep disorders through video-telemetry electroencephalography in the epilepsy monitoring unit is briefly reviewed. This report also illustrates the novel use of clobazam for the treatment of exploding head syndrome.

  3. Material monitoring

    International Nuclear Information System (INIS)

    Kotter, W.; Zirker, L.; Hancock, J.A.

    1995-01-01

    Waste Reduction Operations Complex (WROC) facilities are located at the Idaho National Engineering Laboratory (INEL). The overall goal for the Pollution Prevention/Waste Minimization Unit is to identify and establish the correct amount of waste generated so that it can be reduced. Quarterly, the INEL Pollution Prevention (P2) Unit compares the projected amount of waste generated per process with the actual amount generated. Examples of waste streams that would be addresses for our facility would include be are not limited to: Maintenance, Upgrades, Office and Scrap Metal. There are three potential sources of this variance: inaccurate identification of those who generate the waste; inaccurate identification of the process that generates the waste; and inaccurate measurement of the actual amount generated. The Materials Monitoring Program was proposed to identify the sources of variance and reduce the variance to an acceptable level. Prior to the implementation of the Material Monitoring Program, all information that was gathered and recorded was done so through an informal estimation of waste generated by various personnel concerned with each processes. Due to the inaccuracy of the prior information gathering system, the Material Monitoring Program was established. The heart of this program consists of two main parts. In the first part potential waste generators provide information on projected waste generation process. In the second part, Maintenance, Office, Scrap Metal and Facility Upgrade wastes from given processes is disposed within the appropriate bin dedicated to that process. The Material Monitoring Program allows for the more accurate gathering of information on the various waste types that are being generated quarterly

  4. Emergency monitoring strategy and radiation measurements document of the NKS project emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD)

    Energy Technology Data Exchange (ETDEWEB)

    Lahtinen, J. [Radiation and Nuclear Safety Authority (STUK) (Finland)

    2006-04-15

    This report is one of the deliverables of the NKS Project Emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD) (20022005). The project and the overall results are briefly described in the NKS publication 'Emergency Management and Radiation Monitoring in Nuclear and Radiological Accidents. Summary Report on the NKS Project EMARAD' (NKS-137, April 2006). In a nuclear or radiological emergency, all radiation measurements must be performed efficiently and the results interpreted correctly in order to provide the decision-makers with adequate data needed in analysing the situation and carrying out countermeasures. Managing measurements in different situations in a proper way requires the existence of pre-prepared emergency monitoring strategies. Preparing a comprehensive yet versatile strategy is not an easy task to perform because there are lots of different factors that have to be taken into account. The primary objective of this study was to discuss the general problematics concerning emergency monitoring strategies and to describe a few important features of an efficient emergency monitoring system as well as factors affecting measurement activities in practise. Some information concerning the current situation in the Nordic countries has also been included. (au)

  5. Feasibility of Telemetric Intracranial Pressure Monitoring in the Neuro Intensive Care Unit.

    Science.gov (United States)

    Lilja-Cyron, Alexander; Kelsen, Jesper; Andresen, Morten; Fugleholm, Kåre; Juhler, Marianne

    2018-05-03

    Intracranial pressure (ICP) monitoring is crucial in the management of acute neurosurgical conditions such as traumatic brain injury (TBI). However, pathological ICP may persist beyond the admission to the neuro intensive care unit (NICU). We investigated the feasibility of telemetric ICP monitoring in the NICU, as this technology provides the possibility of long-term ICP assessment beyond NICU discharge. In this prospective investigation, we implanted telemetric ICP sensors (Raumedic Neurovent-P-tel) instead of conventional, cabled ICP sensors in patients undergoing decompressive craniectomy. We recorded ICP curves, duration of ICP monitoring, signal quality, and complications. Seventeen patients were included (median age 55 years) and diagnoses were: severe TBI (8), malignant middle cerebral artery infarction (8), and spontaneous intracerebral hemorrhage (1). In total, 3015 h of ICP monitoring were performed, and the median duration of ICP monitoring was 188 h (interquartile range [IQR] 54-259). The ICP signal was lost 613 times (displacement of the reader unit on the skin) for a median of 1.5 min, corresponding to 0.8% of the total monitoring period. When the signal was lost, it could always be restored by realignment of the reader unit on the skin above the telemetric sensor. Sixteen of 17 patients survived the NICU admission, and ICP gradually decreased from 10.7 mm Hg (IQR 7.5-13.6) during the first postoperative day to 6.3 mm Hg (IQR 4.0-8.3) after 1 week in the NICU. All 17 implanted telemetric sensors functioned throughout the NICU admission, and no wound infections were observed. Therefore, telemetric ICP monitoring in an acute neurosurgical setting is feasible. Signal quality and stability are sufficient for clinical decision making based on mean ICP. The low sampling frequency (5 Hz) does not permit analysis of intracranial pulse wave morphology, but resolution is sufficient for calculation of derived indices such as the pressure reactivity

  6. U-tube based near-surface environmental monitoring in the Shenhua carbon dioxide capture and storage (CCS) project.

    Science.gov (United States)

    Li, Qi; Song, Ranran; Shi, Hui; Ma, Jianli; Liu, Xuehao; Li, Xiaochun

    2018-04-01

    The CO 2 injected into deep formations during implementation of carbon dioxide (CO 2 ) capture and storage (CCS) technology may leak and migrate into shallow aquifers or ground surfaces through a variety of pathways over a long period. The leaked CO 2 can threaten shallow environments as well as human health. Therefore, almost all monitoring programs for CCS projects around the world contain near-surface monitoring. This paper presents a U-tube based near-surface monitoring technology focusing on its first application in the Shenhua CCS demonstration project, located in the Ordos Basin, Inner Mongolia, China. First, background information on the site monitoring program of the Shenhua CCS demonstration project was provided. Then, the principle of fluid sampling and the monitoring methods were summarized for the U-tube sampler system, and the monitoring data were analyzed in detail. The U-tube based monitoring results showed that the U-tube sampler system is accurate, flexible, and representative of the subsurface fluid sampling process. The monitoring indicators for the subsurface water and soil gas at the Shenhua CCS site indicate good stratification characteristics. The concentration level of each monitoring indicator decreases with increasing depth. Finally, the significance of this near-surface environmental monitoring technology for CO 2 leakage assessments was preliminarily confirmed at the Shenhua CCS site. The application potential of the U-tube based monitoring technology was also demonstrated during the subsurface environmental monitoring of other CCS projects.

  7. 76 FR 75523 - Vessel Monitoring Systems; Approved Mobile Transmitting Units and Communications Service...

    Science.gov (United States)

    2011-12-02

    ... Monitoring Systems; Approved Mobile Transmitting Units and Communications Service Providers for Use in... relevant features of the enhanced mobile transmitting unit (E-MTU) VMS and communications service providers... with the Orbcomm mobile communications provider service. Skymate can be reached at 866-SKYMATE and...

  8. Ground-water monitoring compliance projects for Hanford Site facilities: Annual progress report for 1987

    International Nuclear Information System (INIS)

    Hall, S.H.

    1988-09-01

    This report describes progress during 1987 of five Hanford Site ground water monitoring projects. Four of these projects are being conducted according to regulations based on the federal Resource Conservation and Recovery Act of 1976 and the state Hazardous Waste Management Act. The fifth project is being conducted according to regulations based on the state Solid Waste Management Act. The five projects discussed herein are: 300 Area Process Trenches; 183-H Solar Evaporation Basins; 200 Areas Low-Level Burial Grounds; Nonradioactive Dangerous Waste Landfill; Solid Waste Landfill. For each of the projects, there are included, as applicable, discussions of monitoring well installations, water-table measurements, background and/or downgradient water quality and results of chemical analysis, and extent and rate of movement of contaminant plumes. 14 refs., 30 figs., 13 tabs

  9. An advanced NSSS integrity monitoring system for Shin-Kori nuclear units 3 and 4

    International Nuclear Information System (INIS)

    Oh, Y. G.; Kim, H. B.; Galin, S. R.; Kim, S. H.; Lee, S. J.

    2009-01-01

    The advanced design features of NSSS (Nuclear Steam Supply System) Integrity Monitoring System for Shin-Kori Nuclear Units 3 and 4 are summarized herein. During the overall system design and detailed component design processes, many design improvements have been made for the system. The major design changes are: 1) the application of a common software platform for all subsystems, 2) the implementation of remote access, control and monitoring capabilities, and 3) the equipment redesign and rearrangement that has simplified the system architecture. Changes give an effect on cabinet size, number of cables, cyber-security, graphic user interfaces, and interfaces with other monitoring systems. The system installation and operation for Shin-Kori Nuclear Units 3 and 4 will be more convenient than those for previous Korean nuclear units in view of its remote control capability, automated test functions, improved user interface functions, and much less cabling. (authors)

  10. An Advanced NSSS Integrity Monitoring System for Shin-Kori Nuclear Units 3 and 4

    Science.gov (United States)

    Oh, Yang Gyun; Galin, Scott R.; Lee, Sang Jeong

    2010-12-01

    The advanced design features of NSSS (Nuclear Steam Supply System) Integrity Monitoring System for Shin-Kori Nuclear Units 3 and 4 are summarized herein. During the overall system design and detailed component design processes, many design improvements have been made for the system. The major design changes are: 1) the application of a common software platform for all subsystems, 2) the implementation of remote access, control and monitoring capabilities, and 3) the equipment redesign and rearrangement that has simplified the system architecture. Changes give an effect on cabinet size, number of cables, cyber-security, graphic user interfaces, and interfaces with other monitoring systems. The system installation and operation for Shin-Kori Nuclear Units 3 and 4 will be more convenient than those for previous Korean nuclear units in view of its remote control capability, automated test functions, improved user interface functions, and much less cabling.

  11. Technology monitoring; Technologie-Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Eicher, H.; Rigassi, R. [Eicher und Pauli AG, Liestal (Switzerland); Ott, W. [Econcept AG, Zuerich (Switzerland)

    2003-07-01

    This study made for the Swiss Federal Office of Energy (SFOE) examines ways of systematically monitoring energy technology development and the cost of such technologies in order to pave the way to a basis for judging the economic development of new energy technologies. Initial results of a survey of the past development of these technologies are presented and estimates are made of future developments in the areas of motor-based combined heat and power systems, fuel-cell heating units for single-family homes and apartment buildings, air/water heat pumps for new housing projects and high-performance thermal insulation. The methodology used for the monitoring and analysis of the various technologies is described. Tables and diagrams illustrate the present situation and development potential of various fields of technology.

  12. Enhanced dynamic wedge and independent monitor unit verification

    International Nuclear Information System (INIS)

    Howlett, S.J.; University of Newcastle, NSW

    2004-01-01

    Full text: Some serious radiation accidents have occurred around the world during the delivery of radiotherapy treatment. The regrettable incident in Panama clearly indicated the need for independent monitor unit (MU) verification. Indeed the International Atomic Energy Agency (IAEA), after investigating the incident, made specific recommendations for radiotherapy centres which included an independent monitor unit check for all treatments. Independent monitor unit verification is practiced in many radiotherapy centres in developed countries around the world. It is mandatory in USA but not yet in Australia. The enhanced dynamic wedge factor (EDWF) presents some significant problems in accurate MU calculation, particularly in the case of non centre of field position (COF). This paper describes development of an independent MU program, concentrating on the implementation of the EDW component. The difficult case of non COF points under the EDW was studied in detail. A survey of Australasian centres regarding the use of independent MU check systems was conducted. The MUCalculator was developed with reference to MU calculations made by Pinnacle 3D RTP system (Philips) for 4MV, 6MV and 18MV X-ray beams from Varian machines used at the Newcastle Mater Misericordiae Hospital (NMMH) in the clinical environment. Ionisation chamber measurements in solid water TM and liquid water were performed based on a published test data set. Published algorithms combined with a depth dependent profile correction were applied in an attempt to match measured data with maximum accuracy. The survey results are presented. Substantial data is presented in tabular form and extensive comparison with published data. Several different methods for calculating EDWF are examined. A small systematic error was detected in the Gibbon equation used for the EDW calculations. Generally, calculations were within +2% of measured values, although some setups exceeded this variation. Results indicate that COF

  13. The extratemporal lobe epilepsies in the epilepsy monitoring unit

    Science.gov (United States)

    Dash, Deepa; Tripathi, Manjari

    2014-01-01

    Extratemporal lobe epilepsies (ETLE) are characterized by the epileptogenic foci outside the temporal lobe. They have a wide spectrum of semiological presentation depending upon the site of origin. They can arise from frontal, parietal, occipital lobes and from hypothalamic hamartoma. We discuss in this review the semiology of different types of ETLE encountered in the epilepsy monitoring unit. PMID:24791090

  14. IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2008-09-01

    This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.

  15. URBAN SPRAWL MODELING, AIR QUALITY MONITORING AND RISK COMMUNICATION: THE NORTHEAST OHIO PROJECT

    Science.gov (United States)

    The Northeast Ohio Urban Sprawl, Air Quality Monitoring, and Communications Project (hereafter called the Northeast Ohio Project) provides local environmental and health information useful to residents, local officials, community planners, and others in a 15 county region in the ...

  16. A high arctic experience of uniting research and monitoring

    Science.gov (United States)

    Schmidt, Niels Martin; Christensen, Torben R.; Roslin, Tomas

    2017-07-01

    Monitoring is science keeping our thumb on the pulse of the environment to detect any changes of concern for societies. Basic science is the question-driven search for fundamental processes and mechanisms. Given the firm root of monitoring in human interests and needs, basic sciences have often been regarded as scientifically "purer"—particularly within university-based research communities. We argue that the dichotomy between "research" and "monitoring" is an artificial one, and that this artificial split clouds the definition of scientific goals and leads to suboptimal use of resources. We claim that the synergy between the two scientific approaches is well distilled by science conducted under extreme logistic constraints, when scientists are forced to take full advantage of both the data and the infrastructure available. In evidence of this view, we present our experiences from two decades of uniting research and monitoring at the remote research facility Zackenberg in High Arctic Greenland. For this site, we show how the combination of insights from monitoring with the mechanistic understanding obtained from basic research has yielded the most complete understanding of the system—to the benefit of all, and as an example to follow. We therefore urge scientists from across the continuum from monitoring to research to come together, to disregard old division lines, and to work together to expose a comprehensive picture of ecosystem change and its consequences.

  17. 75 FR 63445 - Vessel Monitoring Systems; Approved Mobile Transmitting Units and Communications Service...

    Science.gov (United States)

    2010-10-15

    ... Monitoring Systems; Approved Mobile Transmitting Units and Communications Service Providers for Use in the... features of the VMS. ADDRESSES: To obtain copies of the list of NOAA-approved VMS mobile transmitting units and NOAA-approved VMS communications service providers, please contact the VMS Support Center at...

  18. Penn West Energy Trust CO{sub 2} EOR storage monitoring project

    Energy Technology Data Exchange (ETDEWEB)

    Chalaturnyk, R. [Alberta Univ., Edmonton, AB (Canada)

    2007-07-01

    This presentation described Penn West Energy Trust's carbon dioxide (CO{sub 2}) enhanced oil recovery (EOR) storage monitoring project. The project formed part of a royalty credit program that offered a royalty reduction to energy companies as part of a plan to encourage the development of a CO{sub 2} storage industry in Alberta. The multi-agency project is expected to provide a better understanding of the fate of CO{sub 2} injected into petroleum reservoirs and the role that CO{sub 2} storage will play in reducing greenhouse gas (GHG) emissions. The project is located in a reservoir that had previously been waterflooded. High purity CO{sub 2} is injected through 2 directional wells. Data acquired from the field is used to provide information on baseline geology and hydrogeology, as well as to provide details of baseline leakages. Rock properties are investigated in order identify issues affecting rock strength. Geophysical monitoring is conducted to interpret baseline seismic profile datasets as well as to integrate active and passive survey analyses with geochemical characterization studies and reservoir models. The project is currently in the stage of developing a simulation model based on a comprehensive understanding of CO{sub 2} injection mechanisms. The model will be used to predict CO{sub 2} storage capacity and movement. refs., tabs., figs.

  19. WIPP Transparency Project - container tracking and monitoring demonstration using the Authenticated Tracking and Monitoring System (ATMS)

    International Nuclear Information System (INIS)

    SCHOENEMAN, J. LEE; SMARTT, HEIDI ANNE; HOFER, DENNIS

    2000-01-01

    The Authenticated Tracking and Monitoring System (ATMS) is designed to answer the need for global monitoring of the status and location of proliferation-sensitive items on a worldwide basis, 24 hours a day. ATMS uses wireless sensor packs to monitor the status of the items within the shipment and surrounding environmental conditions. Receiver and processing units collect a variety of sensor event data that is integrated with GPS tracking data. The collected data are transmitted to the International Maritime Satellite (INMARSAT) communication system, which then sends the data to mobile ground stations. Authentication and encryption algorithms secure the data during communication activities. A typical ATMS application would be to track and monitor the stiety and security of a number of items in transit along a scheduled shipping route. The resulting tracking, timing, and status information could then be processed to ensure compliance with various agreements

  20. Spread-out Bragg peak and monitor units calculation with the Monte Carlo Code MCNPX

    International Nuclear Information System (INIS)

    Herault, J.; Iborra, N.; Serrano, B.; Chauvel, P.

    2007-01-01

    The aim of this work was to study the dosimetric potential of the Monte Carlo code MCNPX applied to the protontherapy field. For series of clinical configurations a comparison between simulated and experimental data was carried out, using the proton beam line of the MEDICYC isochronous cyclotron installed in the Centre Antoine Lacassagne in Nice. The dosimetric quantities tested were depth-dose distributions, output factors, and monitor units. For each parameter, the simulation reproduced accurately the experiment, which attests the quality of the choices made both in the geometrical description and in the physics parameters for beam definition. These encouraging results enable us today to consider a simplification of quality control measurements in the future. Monitor Units calculation is planned to be carried out with preestablished Monte Carlo simulation data. The measurement, which was until now our main patient dose calibration system, will be progressively replaced by computation based on the MCNPX code. This determination of Monitor Units will be controlled by an independent semi-empirical calculation

  1. Plan for Demonstration of Online Monitoring for the Light Water Reactor Sustainability Online Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Magdy S. Tawfik; Vivek Agarwal; Nancy J. Lybeck

    2011-09-01

    Condition based online monitoring technologies and development of diagnostic and prognostic methodologies have drawn tremendous interest in the nuclear industry. It has become important to identify and resolve problems with structures, systems, and components (SSCs) to ensure plant safety, efficiency, and immunity to accidents in the aging fleet of reactors. The Machine Condition Monitoring (MCM) test bed at INL will be used to demonstrate the effectiveness to advancement in online monitoring, sensors, diagnostic and prognostic technologies on a pilot-scale plant that mimics the hydraulics of a nuclear plant. As part of this research project, INL will research available prognostics architectures and their suitability for deployment in a nuclear power plant. In addition, INL will provide recommendation to improve the existing diagnostic and prognostic architectures based on the experimental analysis performed on the MCM test bed.

  2. Continuous, environmental radon monitoring program at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Liu, N.; Sorensen, C.D.; Tung, C.H.; Orchard, C.R.

    1995-01-01

    A continuous, environmental radon monitoring program has been established in support of the Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP). The monitoring program is to characterize the natural radon emissions at the YMP site, to understand the existing radon concentrations in the environmental background, and to assess and control the potential work exposure. Based upon a study of the monitoring results, this paper presents a preliminary understanding of the magnitudes, characteristics, and exposure levels of radon at the YMP site

  3. Emergency monitoring strategy and radiation measurements. Working document of the NKS project emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD)

    International Nuclear Information System (INIS)

    Lahtinen, J.

    2006-04-01

    This report is one of the deliverables of the NKS Project Emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD) (20022005). The project and the overall results are briefly described in the NKS publication 'Emergency Management and Radiation Monitoring in Nuclear and Radiological Accidents. Summary Report on the NKS Project EMARAD' (NKS-137, April 2006). In a nuclear or radiological emergency, all radiation measurements must be performed efficiently and the results interpreted correctly in order to provide the decision-makers with adequate data needed in analysing the situation and carrying out countermeasures. Managing measurements in different situations in a proper way requires the existence of pre-prepared emergency monitoring strategies. Preparing a comprehensive yet versatile strategy is not an easy task to perform because there are lots of different factors that have to be taken into account. The primary objective of this study was to discuss the general problematics concerning emergency monitoring strategies and to describe a few important features of an efficient emergency monitoring system as well as factors affecting measurement activities in practise. Some information concerning the current situation in the Nordic countries has also been included. (au)

  4. Monitoring and optimization of thermal recovery wells at Nexen's Long Lake project

    Energy Technology Data Exchange (ETDEWEB)

    Furtado, S.; Howe, A.; Wozney, G.; Zaffar, S. [Nexen Inc. (Canada); Nelson, A. [Matrikon Inc. (Canada)

    2011-07-01

    The Long Lake project, operated by Nexen and situated in the Athabasca Oil Sands area in Alberta, Canada is a steam assisted gravity drainage scheme. In such thermal recovery processes, access to real time information is crucial. Nexen used specific tools to optimize monitoring in its Long Lake project and the aim of this paper is to present those customized well and facilities dashboards and reservoir trends. Real time and historical data on pressure, temperature injection and production rates are used in a Honeywell PHD Historian connected to a Delta-V DCS system to optimize recovery from the deposit. Results showed that these enhanced monitoring capabilities provided Nexen the ability to react rapidly to abnormal conditions, which resulted in significant financial benefits. The implementation of dashboard and reservoir trends in its Long Lake project helped Nexen to better monitor the reservoir and thus to optimize bitumen recovery.

  5. The History of the CONCAM Project: All Sky Monitors in the Digital Age

    Science.gov (United States)

    Nemiroff, Robert; Shamir, Lior; Pereira, Wellesley

    2018-01-01

    The CONtinuous CAMera (CONCAM) project, which ran from 2000 to (about) 2008, consisted of real-time, Internet-connected, fisheye cameras located at major astronomical observatories. At its peak, eleven CONCAMs around the globe monitored most of the night sky, most of the time. Initially designed to search for transients and stellar variability, CONCAMs gained initial notoriety as cloud monitors. As such, CONCAMs made -- and its successors continue to make -- ground-based astronomy more efficient. The original, compact, fisheye-observatory-in-a-suitcase design underwent several iterations, starting with CONCAM0 and with the last version dubbed CONCAM3. Although the CONCAM project itself concluded after centralized funding diminished, today more locally-operated, commercially-designed, CONCAM-like devices operate than ever before. It has even been shown that modern smartphones can operate in a CONCAM-like mode. It is speculated that the re-instatement of better global coordination of current wide-angle sky monitors could lead to better variability monitoring of the brightest stars and transients.

  6. Turbidity monitoring at select MDOT construction sites.

    Science.gov (United States)

    2012-06-01

    The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...

  7. Annual report for RCRA groundwater monitoring projects at Hanford Site facilities for 1995

    International Nuclear Information System (INIS)

    Hartman, M.J.

    1996-02-01

    This report presents the annual hydrogeologic evaluation of 19 Resource Conservation and Recovery Act of 1976 facilities and 1 nonhazardous waste facility at the US Department of Energy's Hanford Site. Although most of the facilities no longer receive dangerous waste, a few facilities continue to receive dangerous waste constituents for treatment, storage, or disposal. The 19 Resource Conservation and Recovery Act facilities comprise 29 waste management units. Nine of the units are monitored under groundwater quality assessment status because of elevated levels of contamination indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration profiles, rate, and extent of migration are evaluated. Groundwater is monitored at the other 20 units to detect leakage, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1994 and September 1995. Groundwater quality is described for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides

  8. Annual report for RCRA groundwater monitoring projects at Hanford site facilities for 1994

    International Nuclear Information System (INIS)

    1995-02-01

    This report presents the annual hydrogeologic evaluation of 19 Resource Conservation and Recovery Act of 1976 facilities and 1 nonhazardous waste facility at the U.S. Department of Energy's Hanford Site. Although most of the facilities no longer receive dangerous waste, a few facilities continue to receive dangerous waste constituents for treatment, storage, or disposal. The 19 Resource Conservation and Recovery Act facilities comprise 29 waste management units. Nine of the units are monitored under groundwater quality assessment status because of elevated levels of contamination indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration profiles, rate, and extent of migration are evaluated. Groundwater is monitored at the other 20 units to detect leakage, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1993 and September 1994. Groundwater quality is described for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides

  9. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  10. Construction safety monitoring based on the project's characteristic with fuzzy logic approach

    Science.gov (United States)

    Winanda, Lila Ayu Ratna; Adi, Trijoko Wahyu; Anwar, Nadjadji; Wahyuni, Febriana Santi

    2017-11-01

    Construction workers accident is the highest number compared with other industries and falls are the main cause of fatal and serious injuries in high rise projects. Generally, construction workers accidents are caused by unsafe act and unsafe condition that can occur separately or together, thus a safety monitoring system based on influencing factors is needed to achieve zero accident in construction industry. The dynamic characteristic in construction causes high mobility for workers while doing the task, so it requires a continuously monitoring system to detect unsafe condition and to protect workers from potential hazards. In accordance with the unique nature of project, fuzzy logic approach is one of the appropriate methods for workers safety monitoring on site. In this study, the focus of discussion is based on the characteristic of construction projects in analyzing "potential hazard" and the "protection planning" to be used in accident prevention. The data have been collected from literature review, expert opinion and institution of safety and health. This data used to determine hazard identification. Then, an application model is created using Delphi programming. The process in fuzzy is divided into fuzzification, inference and defuzzification, according to the data collection. Then, the input and final output data are given back to the expert for assessment as a validation of application model. The result of the study showed that the potential hazard of construction workers accident could be analysed based on characteristic of project and protection system on site and fuzzy logic approach can be used for construction workers accident analysis. Based on case study and the feedback assessment from expert, it showed that the application model can be used as one of the safety monitoring tools.

  11. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Wastewater-Inspection and Monitoring Requirements for Waste Management Units 7 Table 7 to Subpart GGG of Part 63 Protection of Environment... for Waste Management Units To comply with Inspection or monitoring requirement Frequency of inspection...

  12. Drafting a monitoring plan for the ROAD project under the EU CCS directive

    NARCIS (Netherlands)

    Steegs, T.P.H.; Neelse, F.P.; Gittins, C.; Ros, M.

    2014-01-01

    The Rotterdam Capture and Storage Demonstration Project (ROAD) is an integrated CCS project in the Netherlands that has recently completed the storage permitting process. Development of the monitoring and contingency plans is a key component of this process. Our paper discusses the development of

  13. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    International Nuclear Information System (INIS)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of ''emerging clean coal technologies'' under the categories of ''in boiler control of oxides of sulfur and nitrogen'' as well as ''post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO 2 ) and nitrogen oxide (NO x ) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs

  14. 78 FR 69363 - Lake Tahoe Basin Management Unit, California, Heavenly Mountain Resort Epic Discovery Project

    Science.gov (United States)

    2013-11-19

    ... DEPARTMENT OF AGRICULTURE Forest Service Lake Tahoe Basin Management Unit, California, Heavenly Mountain Resort Epic Discovery Project AGENCY: Lake Tahoe Basin Management Unit, Forest Service, USDA...: The Epic Discovery Project is intended to enhance summer activities in response to the USDA Forest...

  15. 1982 environmental-monitoring program report for the West Valley Demonstration Project site

    International Nuclear Information System (INIS)

    1983-05-01

    This report is prepared and submitted in accordance with the requirements of DOE Order 5484.1 and presents environmental monitoring program data collected at the West Valley Demonstration Project (WVDP) site from February 26, 1982, through December 31, 1982. The WVDP objective is to solidify approximately 600,000 gallons of high-level liquid radioactive waste stored at the former Nuclear Fuel Services reprocessing facility at West Valley, New York. Nuclear Fuel Services conducted an environmental monitoring program in accordance with Nuclear Regulatory Commission requirements which were appropriate for shutdown maintenance operations conducted at the site. That program was embraced by West Valley Nuclear Services Company (WVNS) at the time of transition (February 26, 1982) and will be modified to provide a comprehensive monitoring program in preparation for waste solidification operations scheduled for startup in June 1988. As such, the data presented in this report is considered preoperational in nature in accordance with DOE Order 5484.1, Chapter III, Paragraph 1. The environmental monitoring program planned for the operating phase of the project will be fully implemented by fiscal year 1985 and will provide at least two years of preoperational data prior to startup

  16. 2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

    Energy Technology Data Exchange (ETDEWEB)

    Findlay, Rick [US Department of Energy, Washington, DC (United States).Office of Legacy Management

    2015-11-01

    This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The corrective action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.

  17. The Senegal Project: A Cultural Foods Unit for Middle School Students

    Science.gov (United States)

    Nelson, Diane

    2011-01-01

    The Senegal Project is the culminating project in a unit on cultural foods in an 8th grade family and consumer sciences (FCS) course. Initially, students take a quick world tour by studying and cooking foods from Mexico, Italy, China, and India followed by a "more depth and less breadth" study of Senegal, a country with a culture vastly…

  18. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    International Nuclear Information System (INIS)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-01

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork

  19. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-15

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork.

  20. Groundwater quality data in 15 GAMA study units: results from the 2006–10 Initial sampling and the 2009–13 resampling of wells, California GAMA Priority Basin Project

    Science.gov (United States)

    Kent, Robert

    2015-08-31

    The Priority Basin Project (PBP) of the Groundwater Ambient Monitoring and Assessment (GAMA) program was developed in response to the Groundwater Quality Monitoring Act of 2001 and is being conducted by the U.S. Geological Survey (USGS) in cooperation with the California State Water Resources Control Board (SWRCB). From May 2004 to March 2012, the GAMA-PBP collected samples from more than 2,300 wells in 35 study units across the State. Selected wells in each study unit were sampled again approximately 3 years after initial sampling as part of an assessment of temporal trends in water quality by the GAMA-PBP. This triennial (every 3 years) trend sampling of GAMA-PBP study units concluded in December 2013. Fifteen of the study units, initially sampled between January 2006 and June 2010 and sampled a second time between April 2009 and April 2013 to assess temporal trends, are the subject of this report.

  1. Microseismic monitoring during Hydraulic stimulation in Pohang (Korea) for EGS pilot project

    Science.gov (United States)

    Kim, M.; Yoon, B.; Lee, C.; Park, K. G.; Yoon, W. S.; Song, Y.; Lee, T. J.

    2017-12-01

    Since the geothermal anomaly in the Pohang area has been reported in 1960s, various geological and geophysical surveys have been conducted by Korea Institute of Geoscience and Mineral Resources (KIGAM) including gravity, seismic, airborne magnetic and magneto-telluric surveys. Based on these explorations, the Enhanced Geothermal System (EGS) pilot project has been carried out in Pohang since the end of 2010. One vertical well (PX-2, MD 4,348 m) and one deviated well (PX-1, MD 4,362 m) have been drilled in granite rock for the EGS. Microseismic (MS) monitoring is the best way to understand how the fracture grows during the hydraulic stimulation. KIGAM has set up 9 shallow borehole stations (100-130 m), 4 surface stations and two borehole geophones (1,350 and 1,550 m deep) within 5 km radius from injection well for the MS monitoring during hydraulic stimulation. The first hydraulic stimulation started on January 29th to February 20th, 2016 at PX-2 and the second stimulation was conducted in PX-1 from December 15th, 2016 to January 11th, 2017. Several hundreds of MS events occurred during stimulation and the biggest event was ML 2.3 during the shut in period of the second stimulation. Based on the results of the MS monitoring, a soft stimulation is scheduled at PX-1 in cooperation with one of the European Horizon2020 project, DESTRESS (Demonstration of soft stimulation treatments of geothermal reservoirs). We will present the MS monitoring system in Pohang and the data of the stimulation with the MS monitoring results. We believe that the data from Pohang will improve the understanding of seismic behavior due to hydraulic stimulation in crystalline rocks and also will contribute to success of the Pohang EGS project.

  2. Results of the marine biota monitoring during drilling activity on Campos Basin, Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Petta, Claudia Brigagao de; Bastos, Fabio; Danielski, Monica; Ferreira, Mariana; Gama, Mariana; Coelho, Ana Paula Athanazio; Maia, Decio [Aecom do Brasil Ltda, Rio de Janeiro, RJ (Brazil)

    2012-07-01

    The Environmental Monitoring Project (PMA) aims to report environmental changes arising from drilling activity, in relation to the marine fauna. This project can also help in the monitoring of accidental spills. Since the professionals spend six hours of the day monitoring the ocean around the rigs, they can locate and identify oil stains, notify the responsible onboard, and also help in the monitoring of the oil stain. Such Project has been developed onboard a drilling unit working in Campos Basin. The results presented here were collected during the drilling activity in Bijupira and Salema fields, by Shell Brasil Petroleo Ltda, from July 13th to October 8th, 2011.

  3. An overview of the Environmental Monitoring Computer Automation Project

    International Nuclear Information System (INIS)

    Johnson, S.M.; Lorenz, R.

    1992-01-01

    The Savannah River Site (SRS) was bulk to produce plutonium and tritium for national defense. As a result of site operations, routine and accidental releases of radionuclides have occurred. The effects these releases have on the k>cal population and environment are of concern to the Department of Energy (DOE) and SRS personnel. Each year, approximately 40,000 environmental samples are collected. The quality of the samples, analytical methods and results obtained are important to site personnel. The Environmental Monitoring Computer Automation Project (EMCAP) was developed to better manage scheduling, log-in, tracking, analytical results, and report generation. EMCAP can be viewed as a custom Laboratory Information Management System (LIMS) with the ability to schedule samples, generate reports, and query data. The purpose of this paper is to give an overview of the SRS environmental monitoring program, describe the development of EMCAP software and hardware, discuss the different software modules, show how EMCAP improved the Environmental Monitoring Section program, and examine the future of EMCAP at SRS

  4. Data summary report on short-term turbidity monitoring of pipeline river crossings in the Moyie River, Boundary County, Idaho: PGT-PG&E Pipeline Expansion Project

    Energy Technology Data Exchange (ETDEWEB)

    Gowdy, M.J.; Smits, M.P.; Wilkey, P.L.; Miller, S.F.

    1994-03-01

    A water-quality monitoring program was implemented for Bechtel Corporation to measure the short-term increases in turbidity in the Moyie River caused by construction activities of the Pacific Gas Transmission-Pacific Gas & Electric Pipeline Expansion Project. Construction of the buried, 42-in.-diameter, steel pipeline, during the summer of 1992, involved eight wet crossings of the Moyie River along the 13-mi section of pipeline immediately south of the Canadian-United States border in Boundary County, Idaho. This report summarizes the sampling and analysis protocol used and gives the results and observations for each of the eight crossings. The data obtained from this monitoring program, in addition to satisfying regulatory requirements for the Pipeline Expansion Project, will contribute to an ongoing long-term study of the Moyie River crossings being performed for the Gas Research Institute by Argonne National Laboratory. The purpose of this document is strictly limited to reporting the results of the monitoring program. Interpretation of the data is not within the scope of this report.

  5. The Transit Monitoring in the South (TraMoS project

    Directory of Open Access Journals (Sweden)

    López-Morales Mercedes

    2013-04-01

    Full Text Available We present the Transit Monitoring in the South (TraMoS project. TraMoS has monitored transits of 30 exoplanets with telescopes located in Chile since 2008, whit the following goals: (1 to refine the physical and/or orbital parameters of those exoplanet system, and (2 to search for variations in the mid-times of the transits and in other parameters such as orbital inclination or transit's depth, that could indicate the presence of additional bodies in the system. We highlight here the first results of TraMoS in three selected exoplanets.

  6. Mitigation and monitoring plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-06-01

    The U.S Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project is the result of the Uranium Mill Tailings Radiation Control Act(UMTRA) which was passed in response to the public's concern over the potential public health hazards related to uranium mill tailings and associated contaminated material at abandoned or otherwise uncontrolled inactive processing sites throughout the United States. The Gunnison, Colorado abandoned uranium mill site is one of the sites slated for cleanup by the DOE under authority of UMTRA. The contaminated material at this site will be transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities will temporarily disturb 0.8 acre and permanently eliminate 5.1 acres of wetlands. This report describes the proposed mitigation plan for the 5.9 acres of impacted wetlands. In conjunction with the mitigation of the permanently impacted wetlands through the enhancement of wetland and adjacent riparian areas, impacts to wildlife as a result of this project will also be mitigated. However, wildlife mitigation is not the focus of this document and is covered in relevant BLM permits for this project. This plan proposes the enhancement of a 3:1 ratio of impacted wetlands in accordance with US Environmental Protection Agency guidelines, plus the enhancement of riparian areas for wildlife mitigation. Included in this mitigation plan is a monitoring plan to ensure that the proposed measures are working and being maintained

  7. Optimizing Seismic Monitoring Networks for EGS and Conventional Geothermal Projects

    Science.gov (United States)

    Kraft, Toni; Herrmann, Marcus; Bethmann, Falko; Stefan, Wiemer

    2013-04-01

    In the past several years, geological energy technologies receive growing attention and have been initiated in or close to urban areas. Some of these technologies involve injecting fluids into the subsurface (e.g., oil and gas development, waste disposal, and geothermal energy development) and have been found or suspected to cause small to moderate sized earthquakes. These earthquakes, which may have gone unnoticed in the past when they occurred in remote sparsely populated areas, are now posing a considerable risk for the public acceptance of these technologies in urban areas. The permanent termination of the EGS project in Basel, Switzerland after a number of induced ML~3 (minor) earthquakes in 2006 is one prominent example. It is therefore essential for the future development and success of these geological energy technologies to develop strategies for managing induced seismicity and keeping the size of induced earthquakes at a level that is acceptable to all stakeholders. Most guidelines and recommendations on induced seismicity published since the 1970ies conclude that an indispensable component of such a strategy is the establishment of seismic monitoring in an early stage of a project. This is because an appropriate seismic monitoring is the only way to detect and locate induced microearthquakes with sufficient certainty to develop an understanding of the seismic and geomechanical response of the reservoir to the geotechnical operation. In addition, seismic monitoring lays the foundation for the establishment of advanced traffic light systems and is therefore an important confidence building measure towards the local population and authorities. We have developed an optimization algorithm for seismic monitoring networks in urban areas that allows to design and evaluate seismic network geometries for arbitrary geotechnical operation layouts. The algorithm is based on the D-optimal experimental design that aims to minimize the error ellipsoid of the linearized

  8. Independent dose per monitor unit review of eight U.S.A. proton treatment facilities

    International Nuclear Information System (INIS)

    Moyers, M. F.; Ibbott, G. S.; Grant, R. L.; Summers, P. A.; Followill, D. S.

    2014-01-01

    Purpose: Compare the dose per monitor unit at different proton treatment facilities using three different dosimetry methods. Methods: Measurements of dose per monitor unit were performed by a single group at eight facilities using 11 test beams and up to six different clinical portal treatment sites. These measurements were compared to the facility reported dose per monitor unit values. Results: Agreement between the measured and reported doses was similar using any of the three dosimetry methods. Use of the ICRU 59 N D,w based method gave results approximately 3% higher than both the ICRU 59 N X and ICRU 78 (TRS-398) N D,w based methods. Conclusions: Any single dosimetry method could be used for multi-institution trials with similar conformity between facilities. A multi-institutional trial could support facilities using both the ICRU 59 N X based and ICRU 78 (TRS-398) N D,w based methods but use of the ICRU 59 N D,w based method should not be allowed simultaneously with the other two until the difference is resolved

  9. Surviving the Lead Reliability Engineer Role in High Unit Value Projects

    Science.gov (United States)

    Perez, Reinaldo J.

    2011-01-01

    A project with a very high unit value within a company is defined as a project where a) the project constitutes one of a kind (or two-of-a-kind) national asset type of project, b) very large cost, and c) a mission failure would be a very public event that will hurt the company's image. The Lead Reliability engineer in a high visibility project is by default involved in all phases of the project, from conceptual design to manufacture and testing. This paper explores a series of lessons learned, over a period of ten years of practical industrial experience by a Lead Reliability Engineer. We expand on the concepts outlined by these lessons learned via examples. The lessons learned are applicable to all industries.

  10. Evaluating the Use of Tissue Oximetry to Decrease Intensive Unit Monitoring for Free Flap Breast Reconstruction.

    Science.gov (United States)

    Ricci, Joseph A; Vargas, Christina R; Ho, Olivia A; Lin, Samuel J; Tobias, Adam M; Lee, Bernard T

    2017-07-01

    Postoperative free flap care has historically required intensive monitoring for 24 hours in an intensive care unit. Continuous monitoring with tissue oximetry has allowed earlier detection of vascular compromise, decreasing flap loss and improving salvage. This study aims to identify whether a fast-track postoperative paradigm can be safely used with tissue oximetry to decrease intensive monitoring and costs. All consecutive microsurgical breast reconstructions performed at a single institution were reviewed (2008-2014) and cases requiring return to the operating room were identified. Data evaluated included patient demographics, the take back time course, and complications of flap loss and salvage. A cost-benefit analysis was performed to analyse the utility of a postoperative intensive monitoring setting. There were 900 flaps performed and 32 required an unplanned return to the operating room. There were 16 flaps that required a reexploration within the first 24 hours; the standard length of intensive unit monitoring. After 4 hours, there were 7 flaps (44%) detected by tissue oximetry for reexploration. After 15 hours of intensive monitoring postoperatively, cost analysis revealed that the majority (15/16; 94%) of failing flaps had been identified and the cost of identifying each subsequent failing flap exceeded the cost of another hour of intensive monitoring. The postoperative paradigm for microsurgical flaps has historically required intensive unit monitoring. Using tissue oximetry, a fast-track pathway can reduce time spent in an intensive monitoring setting from 24 to 15 hours with significant cost savings and minimal risk of missing a failing free flap.

  11. Projecting climate change in the United States: A technical document supporting the Forest Service RPA 2010 Assessment

    Science.gov (United States)

    Linda A. Joyce; David T. Price; David P. Coulson; Daniel W. McKenney; R. Martin Siltanen; Pia Papadopol; Kevin. Lawrence

    2014-01-01

    A set of climate change projections for the United States was developed for use in the 2010 USDA Forest Service RPA Assessment. These climate projections, along with projections for population dynamics, economic growth, and land use change in the United States, comprise the RPA scenarios and are used in the RPA Assessment to project future renewable resource conditions...

  12. Wireless transmission design for health monitoring at neonatal intensive care units

    NARCIS (Netherlands)

    Chen, W.; Nguyen, S.T.; Bambang Oetomo, S.; Feijs, L.M.G.

    2009-01-01

    Health monitoring is crucial for the survival of the ill and fragile infants admitted at the neonatal intensive care unit (NICU) in a hospital. However, the adhesive electrodes and wires cause discomfort to the patients and hamper the parent-child interaction. In this paper, we propose the

  13. PERHITUNGAN DANA PENSIUN DENGAN METODE PROJECTED UNIT CREDIT DAN INDIVIDUAL LEVEL PREMIUM

    Directory of Open Access Journals (Sweden)

    I GUSTI AYU KOMANG KUSUMA WARDHANI

    2014-08-01

    Full Text Available The company which provides the pension program needs the actuarial valuation to estimate the fund amount required by the company to pay for pension funding. Actuarial method that used in this research are projected unit credit and invidual level premium method. Through this research be obtained the result of valuation pension benefits with career average salary assumption is lower than the other salary assumptions. On the other hand, the result of normal cost final value valuation using individual level premium method is smaller than projected unit credit method that suits for the participants of the pension funding program.

  14. PERHITUNGAN DANA PENSIUN DENGAN METODE PROJECTED UNIT CREDIT DAN INDIVIDUAL LEVEL PREMIUM

    Directory of Open Access Journals (Sweden)

    I GUSTI AYU KOMANG KUSUMA WARDHANI

    2014-05-01

    Full Text Available The company which provides the pension program needs the actuarial valuation to estimate the fund amount required by the company to pay for pension funding. Actuarial method that used in this research are projected unit credit and invidual level premium method. Through this research be obtained the result of valuation pension benefits with career average salary assumption is lower than the other salary assumptions. On the other hand, the result of normal cost final value valuation using individual level premium method is smaller than projected unit credit method that suits for the participants of the pension funding program.

  15. Financing Nuclear Projects. Case Study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, Teodor; Constantin, Carmencita; Dobrin, Marian

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) is a major undertaking for all entities involved, due to the necessity of planning work and coordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the public. Having in view the specific investment costs (relatively high) for a NPP, finding an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and secondly, the mathematical modelling of the financing structure effects on the projects. In this respect, the paper will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentation requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, purchase contract, etc). The case study will be focused on the phases achieved in order to promote the Unit 2 NPP Cernavoda completion works project. (authors)

  16. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  17. Project monitoring and evaluation: an enhancing method for health research system management

    Directory of Open Access Journals (Sweden)

    Shirin Djalalinia

    2014-01-01

    Conclusions: We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  18. Integrating a project monitoring system into a public health network: experiences from Alive & Thrive Vietnam.

    Science.gov (United States)

    Tuan, Nguyen Thanh; Alayon, Silvia; Do, Tran Thanh; Ngan, Tran Thi; Hajeebhoy, Nemat

    2015-01-01

    Little information is available about how to build a monitoring system to measure the output of preventive nutrition interventions, such as counselling on infant and young child feeding. This paper describes the Alive & Thrive Vietnam (A&T) project experience in nesting a large-scale project monitoring system into the existing public health information system (e.g. using the system and resources), and in using monitoring data to strengthen service delivery in 15 provinces with A&T franchises. From January 2012 to April 2014, the 780 A&T franchises provided 1,700,000 counselling contacts (~3/4 by commune franchises). In commune franchises in April 2014, 80% of mothers who were pregnant or with children under two years old had been to the counselling service at least one time, and 87% of clients had been to the service earlier. Monitoring data are used to track the progress of the project, make decisions, provide background for a costing study and advocate for the integration of nutrition counselling indicators into the health information system nationwide. With careful attention to the needs of stakeholders at multiple levels, clear data quality assurance measures and strategic feedback mechanisms, it is feasible to monitor the scale-up of nutrition programmes through the existing routine health information system.

  19. 78 FR 1246 - Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the...

    Science.gov (United States)

    2013-01-08

    ...-FF08RSDC00] Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the... scoping with regard to the environmental impact statement (EIS) for the proposed Otay River Estuary... one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  20. Statistical analysis of real-time, enviromental radon monitoring results at the Fernald Enviromental Management Project

    International Nuclear Information System (INIS)

    Liu, Ning; Spitz, H.B.; Tomezak, L.

    1996-01-01

    A comprehensive real-time, environmental radon monitoring program is being conducted at the Fernald Environmental Management Project, where a large quantity of radium-bearing residues have been stored in two covered earth-bermed silos. Statistical analyses was conducted to determine what impact radon emitted by the radium bearing materials contained in the silos has on the ambient radon concentration at the Fernald Environmental Management Project site. The distribution that best describes the outdoor radon monitoring data was determined before statistical analyses were conducted. Random effects associated with the selection of radon monitoring locations were accommodated by using nested and nested factorial classification models. The Project site was divided into four general areas according to their characteristics and functions: (1) the silo area, where the radium-bearing waste is stored; (2) the production/administration area; (3) the perimeter area, or fence-line, of the Fernald Environmental Management Project site; and (4) a background area, located approximately 13 km from the Fernald Environmental Management Project site, representing the naturally-occurring radon concentration. A total of 15 continuous, hourly readout radon monitors were installed to measure the outdoor radon concentration. Measurement results from each individual monitor were found to be log-normally distributed. A series of contrast tests, which take random effects into account, were performed to compare the radon concentration between different areas of the site. These comparisons demonstrate that the radon concentrations in the production/administration area and the perimeter area are statistically equal to the natural background, whereas the silo area is significantly higher than background. The study also showed that the radon concentration in the silo area was significantly reduced after a sealant barrier was applied to the contents of the silos. 10 refs., 6 figs., 8 tabs

  1. ATEE Interactive Co-ordination and Educational Monitoring of Socrates Comenius Action 3 Projects.

    Science.gov (United States)

    Libotton, Arno; Van Braak, Johan; Garofalo, Mara

    2002-01-01

    Asserts that although the Comenius Action 3 courses were well-accepted and high quality, there is a need for a structure for easily monitoring and evaluating these projects. This article presents a pilot project designed with this purpose, which may be useful in implementing a system of coordination and communication among the different projects…

  2. Coordinated Research Projects of the IAEA Atomic and Molecular Data Unit

    Science.gov (United States)

    Braams, B. J.; Chung, H.-K.

    2011-05-01

    The IAEA Atomic and Molecular Data Unit is dedicated to the provision of databases for atomic, molecular and plasma-material interaction (AM/PMI) data that are relevant for nuclear fusion research. IAEA Coordinated Research Projects (CRPs) are the principal mechanism by which the Unit encourages data evaluation and the production of new data. Ongoing and planned CRPs on AM/PMI data are briefly described here.

  3. Coordinated Research Projects of the IAEA Atomic and Molecular Data Unit

    International Nuclear Information System (INIS)

    Braams, B. J.; Chung, H.-K.

    2011-01-01

    The IAEA Atomic and Molecular Data Unit is dedicated to the provision of databases for atomic, molecular and plasma-material interaction (AM/PMI) data that are relevant for nuclear fusion research. IAEA Coordinated Research Projects (CRPs) are the principal mechanism by which the Unit encourages data evaluation and the production of new data. Ongoing and planned CRPs on AM/PMI data are briefly described here.

  4. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  5. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  6. Population Estimates and Projections: Projections of the Population of the United States, 1975 to 2050. Current Population Reports, Series P-25, No. 601.

    Science.gov (United States)

    Gibson, Campbell; Wetrogan, Signe

    This report presents population projections of the United States by age, sex, and the components of population changes, births, deaths, and net immigration. These projections are shown annually by race--white and black--from 1975 to 2000 and in less detail for the total population from 2000 to 2050. In 1974, the population of the United States,…

  7. Acoustic emission monitoring of preservice testing at Watts Bar Unit 1 Nuclear Reactor

    International Nuclear Information System (INIS)

    Hutton, P.H.; Pappas, R.A.; Friesel, M.A.

    1985-02-01

    Acoustic emission (AE) monitoring of selected pressure boundary areas at TVA's Watts Bar, Unit 1 Nuclear Plant in the US during hot functional preservice testing is described. Background, methodology, and results are included. The work discussed here is a major milestone in a program supported by the US NRC to develop and demonstrate application of AE monitoring for continuous surveillance of reactor pressure boundaries to detect and evaluate growing flaws. The subject work demonstrated that anticipated problem areas can be overcome. Work is continuing to AE monitoring during reactor operation. 3 refs., 6 figs

  8. The Gaseous State. Independent Learning Project for Advanced Chemistry (ILPAC). Unit P1.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on the gaseous state is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit consists of two levels. Level one deals with the distinctive characteristics of gases, then considers the gas laws, in particular the ideal gas equation and its applications. Level two concentrates on…

  9. Equilibrium I: Principles. Independent Learning Project for Advanced Chemistry (ILPAC). Unit P2.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on the principles of equilibrium is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit consists of two levels. After a treatment of non-mathematical aspects in level one (the idea of a reversible reaction, characteristics of an equilibrium state, the Le Chatelier's principle),…

  10. Mainstream end-tidal carbon dioxide monitoring in the neonatal intensive care unit.

    Science.gov (United States)

    Rozycki, H J; Sysyn, G D; Marshall, M K; Malloy, R; Wiswell, T E

    1998-04-01

    Continuous noninvasive monitoring of arterial carbon dioxide (CO2) in neonatal intensive care unit (NICU) patients would help clinicians avoid complications of hypocarbia and hypercarbia. End-tidal CO2 monitoring has not been used in this population to date, but recent technical advances and the introduction of surfactant therapy, which improves ventilation-perfusion matching, might improve the clinical utility of end-tidal monitoring. To determine the accuracy and precision of end-tidal CO2 monitoring in NICU patients. Nonrandomized recording of simultaneous end-tidal and arterial CO2 pairs. Two university NICUs. Forty-five newborn infants receiving mechanical ventilation who had indwelling arterial access, and a predefined subsample of infants who were NICU patients is as accurate as capillary or transcutaneous monitoring but less precise than the latter. It may be useful for trending or for screening patients for abnormal arterial CO2 values.

  11. 40 CFR 75.81 - Monitoring of Hg mass emissions and heat input at the unit level.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring of Hg mass emissions and... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTINUOUS EMISSION MONITORING Hg Mass Emission Provisions § 75.81 Monitoring of Hg mass emissions and heat input at the unit level. The owner or operator of the...

  12. Status and understanding of groundwater quality in the Sierra Nevada Regional study unit, 2008: California GAMA Priority Basin Project

    Science.gov (United States)

    Fram, Miranda S.; Belitz, Kenneth

    2014-01-01

    Groundwater quality in the Sierra Nevada Regional (SNR) study unit was investigated as part of the California State Water Resources Control Board’s Groundwater Ambient Monitoring and Assessment Program Priority Basin Project. The study was designed to provide statistically unbiased assessments of the quality of untreated groundwater within the primary aquifer system of the Sierra Nevada. The primary aquifer system for the SNR study unit was delineated by the depth intervals over which wells in the State of California’s database of public drinking-water supply wells are open or screened. Two types of assessments were made: (1) a status assessment that described the current quality of the groundwater resource, and (2) an evaluation of relations between groundwater quality and potential explanatory factors that represent characteristics of the primary aquifer system. The assessments characterize untreated groundwater quality, rather than the quality of treated drinking water delivered to consumers by water distributors.

  13. Results of the MITRA project: Monitoring and intervention for the transportation of dangerous goods

    International Nuclear Information System (INIS)

    Planas, E.; Pastor, E.; Presutto, F.; Tixier, J.

    2008-01-01

    The objective of the MITRA (monitoring and intervention for the transportation of dangerous goods) project was to prototype a new operational system for monitoring the transportation of dangerous goods in Europe based on regional responsibilities. This concept, based on systems used in air traffic control, aims to provide civil security centres with real-time knowledge of the position and contents of dangerous vehicles circulating in their area of responsibility, and, in the event of a dangerous situation, to issue warnings, alerts and crisis management information, thereby allowing intervention teams to react immediately with maximum safety. The project was funded by the European Commission under the 6th Framework Programme (STREP - specific targeted research project - under the Information Society Technologies priority). It started on 1 September 2004 and ended on 31 October 2006. This paper presents the results of this project and the conclusions derived from the field tests carried out in Germany and in the French/Spanish border region in order to test the proposed operational system

  14. Quebec firm develops satellite monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2004-09-01

    Satellite-based technology that gives project owners an affordable way to monitor and control wind turbine operation, even in remote sites, is announced. Called Satwind, the system can be adapted to any scale, ranging from simple, low-cost units for small wind turbines to advanced versions designed to handle more complex wind-diesel installations, as well as large turbines used in offshore projects. Current installations include a turbine in the Tunisian desert and two Quebec wind-diesel plants accessible only by helicopter. The system can be operated directly from a cell-phone, in a user-friendly Internet manner, without the need to be connected to a complex centralized wind farm monitoring system.

  15. Research and Practice of Uav Remote Sensing in the Monitoring and Management of Construction Projects in Riparian Areas

    Science.gov (United States)

    Yu, J.; Gan, Z.; Zhong, L.; Deng, L.

    2018-04-01

    The objective of this paper is to investigate the use of UAV remote sensing in the monitoring and management of construction projects in riparian areas through the case study of embankment construction projects' monitoring in the Three Gorges Reservoir area. A three-step approach is proposed to address the problem: data acquisition with UAV, data processing, and monitoring information extraction. The results of the case study demonstrate that UAV remote sensing is capable of providing fast and accurate measurements and calculations for the needs of monitoring of riparian constructions.

  16. Environmental monitoring for the hot dry rock geothermal energy development project. Annual report, July 1975--June 1976

    Energy Technology Data Exchange (ETDEWEB)

    Pettitt, R.A. (comp.)

    1976-09-01

    The objectives of this environmental monitoring report are to provide a brief conceptual and historical summary of the Hot Dry Rock Geothermal Project, a brief overview of the environmental monitoring responsibilities and activities of the Los Alamos Scientific Laboratory, and descriptions of the studies, problems, and results obtained from the various monitoring programs. Included are descriptions of the work that has been done in three major monitoring areas: (1) water quality, both surface and subsurface; (2) seismicity, with a discussion of the monitoring strategy of regional, local, and close-in detection networks; and (3) climatology. The purpose of these programs is to record baseline data, define potential effects from the project activities, and determine and record any impacts that may occur.

  17. Electronic monitoring and voice prompts improve hand hygiene and decrease nosocomial infections in an intermediate care unit.

    Science.gov (United States)

    Swoboda, Sandra M; Earsing, Karen; Strauss, Kevin; Lane, Stephen; Lipsett, Pamela A

    2004-02-01

    To determine whether electronic monitoring of hand hygiene and voice prompts can improve hand hygiene and decrease nosocomial infection rates in a surgical intermediate care unit. Three-phase quasi-experimental design. Phase I was electronic monitoring and direct observation; phase II was electronic monitoring and computerized voice prompts for failure to perform hand hygiene on room exit; and phase III was electronic monitoring only. Nine-room, 14-bed intermediate care unit in a university, tertiary-care institution. All patient rooms, utility room, and staff lavatory were monitored electronically. All healthcare personnel including physicians, nurses, nursing support personnel, ancillary staff, all visitors and family members, and any other personnel interacting with patients on the intermediate care unit. All patients with an intermediate care unit length of stay >48 hrs were followed for nosocomial infection. Electronic monitoring during all phases, computerized voice prompts during phase II only. We evaluated a total of 283,488 electronically monitored entries into a patient room with 251,526 exits for 420 days (10,080 hrs and 3,549 patient days). Compared with phase I, hand hygiene compliance in patient rooms improved 37% during phase II (odds ratio, 1.38; 95% confidence interval, 1.04-1.83) and 41% in phase III (odds ratio, 1.41; 95% confidence interval, 1.07-1.84). When adjusting for patient admissions during each phase, point estimates of nosocomial infections decreased by 22% during phase II and 48% during phase III; when adjusting for patient days, the number of infections decreased by 10% during phase II and 40% during phase III. Although the overall rate of nosocomial infections significantly decreased when combining phases II and III, the association between nosocomial infection and individual phase was not significant. Electronic monitoring provided effective ongoing feedback about hand hygiene compliance. During both the voice prompt phase and post

  18. Electrical - light current remote monitoring, control and automation. [Coal mine, United Kingdom

    Energy Technology Data Exchange (ETDEWEB)

    Collingwood, C H

    1981-06-01

    A brief discussion is given of the application of control monitoring and automation techniques to coal mining in the United Kingdom, especially of the use of microprocessors, for the purpose of enhancing safety and productivity. Lighting systems for the coal mine is similarly discussed.

  19. The Evolving Contingency Contracting Market: Private Sector Self regulation and United States Government Monitoring of Procurement of Stability Operations Services

    Science.gov (United States)

    2016-01-01

    statements of work would be useful in ensuring ethical govern- ment procurement practices. Conclusions The United States conducts diplomatic, defense...THE EVOLVING CONTINGENCY CONTRACTING MARKET: PRIVATE SECTOR SELF-REGULATION AND UNITED STATES GOVERNMENT MONITORING OF PROCUREMENT OF STABILITY...MARKET: PRIVATE SECTOR SELF-REGULATION AND UNITED STATES GOVERNMENT MONITORING OF PROCUREMENT OF STABILITY OPERATIONS SERVICES Whitney Grespin January

  20. Application for verification of monitor units of the treatment planning system

    International Nuclear Information System (INIS)

    Suero Rodrigo, M. A.; Marques Fraguela, E.

    2011-01-01

    Current estimates algorithms achieve acceptable degree of accuracy. However, operate on the basis of un intuitive models. It is therefore necessary to verify the calculation of monitor units of the treatment planning system (TPS) with those obtained by other independent formalisms. To this end, we have developed an application based on factorization formalism that automates the calculation of dose.

  1. Measurement of the dosimetric parameters for low monitor units in step-and-shoot IMRT delivered by Siemens Artiste linear accelerators; Medida de los parametros dosimetricos para bajo numero de unidades monitor en IMRT segmentada estatica administrada por aceleradores lineales Siemens Artiste

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez Rodriguez, C.; Lopez Fernandez, A.; Saez Beltran, M.; Martin Martin, G.; Alonso Iracheta, L.

    2012-07-01

    Absorbed dose linearity and beam stability, both for low monitor units, are important factors for ensuring planned dose delivery in step-and-shoot IMRT. For Siemens Artiste linear accelerators, under IMRT stable irradiation conditions and for a single segment of 20 cm x 20 cm field size, the linearity of the absorbed dose with the monitor units, field flatness and symmetry have been measured for the range between 1 and 10 monitor units. We have found that absorbed dose linearity with monitor units is within 2% down to 2 monitor units and it is about 9% for 1 monitor unit. Flatness and symmetry values show variations within 1% down to 2 monitor units and increase by 9% for lower values. Using our monitor unit distribution per segment in IMRT we estimate that the uncertainty in absorbed dose for a whole treatment due to these factors is less than 1% (k= 3). (Author) 13 refs.

  2. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  3. Controlling engineering project changes for multi-unit, multi-site standardized nuclear power plants

    International Nuclear Information System (INIS)

    Randall, E.; Boddeker, G.; McGugin, H.; Strother, E.; Waggoner, G.

    1978-01-01

    Multibillioin dollar multiple nuclear power plant projects have numerous potential sources of engineering changes. The majority of these are internally generated changes, client generated changes, and changes from construction, procurement, other engineering organizations, and regulatory organizations. For multiunit, multisite projects, the use of a standardized design is cost effective. Engineering changes can then be controlled for a single standardized design, and the unit or site unique changes can be treated as deviations. Once an effective change procedure is established for change control of the standardized design, the same procedures can be used for control of unit or site unique changes

  4. Support of the Ukrainian supervisory authority in establishing a modern nuclear power plant monitoring

    International Nuclear Information System (INIS)

    Beyer, M.; Carl, H.; Schumann, P.; Seidel, A.; Weiss, F.P.; Zschau, J.; Nowak, K.

    2000-01-01

    The type of monitoring of nuclear power plants in Ukraine practiced in the early nineties provided the supervisory authority with only inadequate access to information about the current safety status of plants. For the Zaporozhye nuclear power plant, unit 5, a technical system to improve operational monitoring has been designed, installed and commissioned for trial operation at the end of 1995 as a pilot project. The system complements existing operational checking and monitoring facilities by including modern means of information technology. It enables concentration on a continuous monitoring of the state of unit 5 in normal operation and in cases of anormalies or incidents so that when recognisable deviations from the regular plant operation occur, the authority can immediately inquire and if necessary impose conditions on the operator. In 1997, the Information and Crisis Centre of the Ukraninian supervisory authority in Kiev was equipped with the most essential technical means necessary for quasi-simultaneous transfer of data and voice and for monitoring purposes and connected to the Centre to the Zaporozhye system. A similar monitoring system for both VVER-440 units of the Rovno nuclear power plant by analogy with the pilot project was specified and put into operation and connected to the ICC in 1998. (orig.) [de

  5. Justification of the project a network of freight terminals unitized cargo

    Directory of Open Access Journals (Sweden)

    Ilesaliev D.I.

    2016-12-01

    Full Text Available In this paper we consider the question of Uzbekistan in promoting the development of international transport in supply chains. The development of transport infrastructure to ensure timely delivery of goods is one of the main tasks in supply chain management. The aim is to study of the project network terminal unitized cargo Uzbekistan in supply chains. Methods the study is based on analysis of existing methods and techniques of Russian scientists in the field of place-ment of objects. The method of searching the most rational location of logistics facility in the supply chain. Also pre-justified the project network terminal unitized cargo in Uzbekistan. Given the state of the problems and prospects of transport logistics of Uzbekistan, the developed method can be used by experts when performing the supporting calcula-tions location of logistic objects.

  6. 24 CFR 882.123 - Conversion of Section 23 Units to Section 8 and Section 23 monitoring.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Conversion of Section 23 Units to... Applicability, Scope and Basic Policies § 882.123 Conversion of Section 23 Units to Section 8 and Section 23 monitoring. (a)-(d) [Reserved] (e) Section 23 policies for units planned for conversion on or before...

  7. Portable Mass Spectrometer Applications for In Situ Environmental Gas Monitoring

    Science.gov (United States)

    Griffin, Timothy P.; Diaz, J. Andres; Arkin, C. Richard; Conejo, Elian

    2005-01-01

    Primary Goal of this project is to (1) Design/build a flexible system to monitor air contamination (2) Learn requirements for operating system in low pressure and low temperature environments (3) Design/build system for integration into aircraft and automobiles Secondary Goals/Offshoots are (1) Fly aboard different aircraft (2)Hand-carry unit (3) Drive unit in automobiles.

  8. Overview of NASA's Carbon Monitoring System Flux-Pilot Project

    Science.gov (United States)

    Pawson, Steven; Gunson, Michael R.; Jucks, Kenneth

    2011-01-01

    NASA's space-based observations of physical, chemical and biological parameters in the Earth System along with state-of-the-art modeling capabilities provide unique capabilities for analyses of the carbon cycle. The Carbon Monitoring System is developing an exploratory framework for detecting carbon in the environment and its changes, with a view towards contributing to national and international monitoring activities. The Flux-Pilot Project aims to provide a unified view of land-atmosphere and ocean-atmosphere carbon exchange, using observation-constrained models. Central to the project is the application of NASA's satellite observations (especially MODIS), the ACOS retrievals of the JAXA-GOSAT observations, and the "MERRA" meteorological reanalysis produced with GEOS-S. With a primary objective of estimating uncertainty in computed fluxes, two land- and two ocean-systems are run for 2009-2010 and compared with existing flux estimates. An transport model is used to evaluate simulated CO2 concentrations with in-situ and space-based observations, in order to assess the realism of the fluxes and how uncertainties in fluxes propagate into atmospheric concentrations that can be more readily evaluated. Finally, the atmospheric partial CO2 columns observed from space are inverted to give new estimates of surface fluxes, which are evaluated using the bottom-up estimates and independent datasets. The focus of this presentation will be on the science goals and current achievements of the pilot project, with emphasis on how policy-relevant questions help focus the scientific direction. Examples include the issue of what spatio-temporal resolution of fluxes can be detected from polar-orbiting satellites and whether it is possible to use space-based observations to separate contributions to atmospheric concentrations of (say) fossil-fuel and biological activity

  9. Power monitoring and control for large scale projects: SKA, a case study

    Science.gov (United States)

    Barbosa, Domingos; Barraca, João. Paulo; Maia, Dalmiro; Carvalho, Bruno; Vieira, Jorge; Swart, Paul; Le Roux, Gerhard; Natarajan, Swaminathan; van Ardenne, Arnold; Seca, Luis

    2016-07-01

    Large sensor-based science infrastructures for radio astronomy like the SKA will be among the most intensive datadriven projects in the world, facing very high demanding computation, storage, management, and above all power demands. The geographically wide distribution of the SKA and its associated processing requirements in the form of tailored High Performance Computing (HPC) facilities, require a Greener approach towards the Information and Communications Technologies (ICT) adopted for the data processing to enable operational compliance to potentially strict power budgets. Addressing the reduction of electricity costs, improve system power monitoring and the generation and management of electricity at system level is paramount to avoid future inefficiencies and higher costs and enable fulfillments of Key Science Cases. Here we outline major characteristics and innovation approaches to address power efficiency and long-term power sustainability for radio astronomy projects, focusing on Green ICT for science and Smart power monitoring and control.

  10. Applicability of the "Frame of Reference" approach for environmental monitoring of offshore renewable energy projects.

    Science.gov (United States)

    Garel, Erwan; Rey, Cibran Camba; Ferreira, Oscar; van Koningsveld, Mark

    2014-08-01

    This paper assesses the applicability of the Frame of Reference (FoR) approach for the environmental monitoring of large-scale offshore Marine Renewable Energy (MRE) projects. The focus is on projects harvesting energy from winds, waves and currents. Environmental concerns induced by MRE projects are reported based on a classification scheme identifying stressors, receptors, effects and impacts. Although the potential effects of stressors on most receptors are identified, there are large knowledge gaps regarding the corresponding (positive and negative) impacts. In that context, the development of offshore MRE requires the implementation of fit-for-purpose monitoring activities aimed at environmental protection and knowledge development. Taking European legislation as an example, it is suggested to adopt standardized monitoring protocols for the enhanced usage and utility of environmental indicators. Towards this objective, the use of the FoR approach is advocated since it provides guidance for the definition and use of coherent set of environmental state indicators. After a description of this framework, various examples of applications are provided considering a virtual MRE project located in European waters. Finally, some conclusions and recommendations are provided for the successful implementation of the FoR approach and for future studies. Copyright © 2014 Elsevier Ltd. All rights reserved.

  11. Current practice and recommendations in UK epilepsy monitoring units. Report of a national survey and workshop.

    Science.gov (United States)

    Hamandi, Khalid; Beniczky, Sandor; Diehl, Beate; Kandler, Rosalind H; Pressler, Ronit M; Sen, Arjune; Solomon, Juliet; Walker, Matthew C; Bagary, Manny

    2017-08-01

    Inpatient video-EEG monitoring (VEM) is an important investigation in patients with seizures or blackouts, and in the pre-surgical workup of patients with epilepsy. There has been an expansion in the number of Epilepsy Monitoring Units (EMU) in the UK offering VEM with a necessary increase in attention on quality and safety. Previous surveys have shown variation across centres on issues including consent and patient monitoring. In an effort to bring together healthcare professionals in the UK managing patients on EMU, we conducted an online survey of current VEM practice and held a one-day workshop convened under the auspices of the British Chapter of the ILAE. The survey and workshop aimed to cover all aspects of VEM, including pre-admission, consent procedures, patient safety, drug reduction and reinstatement, seizure management, staffing levels, ictal testing and good data recording practice. This paper reports on the findings of the survey, the workshop presentations and workshop discussions. 32 centres took part in the survey and there were representatives from 22 centres at the workshop. There was variation in protocols, procedures and consent processes between units, and levels of observation of monitored patients. Nevertheless, the workshop discussion found broad areas of agreement on points. A survey and workshop of UK epilepsy monitoring units found that some variability in practice is inevitable due to different local arrangements and patient groups under investigation. However, there were areas of clear consensus particularly in relation to consent and patient safety that can be applied to most units and form a basis for setting minimum standards. Copyright © 2017 British Epilepsy Association. Published by Elsevier Ltd. All rights reserved.

  12. Physiological Monitoring in Diving Mammals

    Science.gov (United States)

    2015-09-30

    1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Physiological Monitoring in Diving Mammals Andreas...825-2025 email: andreas.fahlman@tamucc.edu Peter L. Tyack School of Biology Sea Mammal Research Unit Scottish Oceans Institute...OBJECTIVES This project is separated into three aims: Aim 1: Develop a new generation of tags/data logger for marine mammals that will

  13. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  14. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  15. CONCEPT OF OPERATIONS PLANS for Phase I the INTERNATIONAL PILOT FOR Global Radiological source SORTING, Tracking, AND MONITORING (GradSStraM) Using eMERGING RFID AND WEB 2.0 TECHNOLOGIES TO PROVIDE TOTAL ASSET AND INFORMATION VISUALIZATIONA United States-European Union Lighthouse Priority Project for fostering trade and reducing regulatory burden

    International Nuclear Information System (INIS)

    Walker, Randy M.

    2009-01-01

    Thousands of shipments of radioisotopes developed in the United States (US) are transported domestically and internationally for medical and industrial applications, including to partner laboratories in European Union (EU) countries. Over the past five years, the Environmental Protection Agency (EPA), the Department of Energy (DOE), and Oak Ridge National Laboratory (ORNL) have worked with state regulatory compliance personnel, key private sector shippers and carriers, the Department of Homeland Security (DHS), the Department of Transportation (DOT), the Department of Defense (DoD) and the Nuclear Regulatory Commission (NRC) on Radio Frequency Identification (RFID) tracking and monitoring of medical and industrial radioisotopes in commerce. The EPA Radiological Source Tracking and Monitoring (RadSTraM) project tested, evaluated, and integrated RFID technologies in laboratory settings, and at multiple private-sector shipping and distribution facilities (Perkin Elmer and DHL) using common radioisotopes used in everyday commerce. The RFID tracking was also tested in association with other deployed technologies including radiation detection, chemical/explosives detection, advanced imaging, lasers, and infrared scanning. At the 2007 EU-US Summit, the leaders of the US Department of Commerce (DOC) and EU European Commission (EC) committed to pursue jointly directed Lighthouse Priority Projects. These projects are intended to 'foster cooperation' and 'reduce regulatory burdens' with respect to transatlantic commerce. The Transatlantic Economic Council (TEC) Lighthouse Project on Radio Frequency Identification (RFID) has been directed to 'develop a joint framework for cooperation on identification and development of best practices for Radio Frequency Identification (RFID) technologies.' The RFID Lighthouse Priority Project commits both sides to endeavor to align U.S. and EU regulatory and policy approaches on RFID technologies, including pilot projects in the public sector

  16. Carmel River Lagoon Enhancement Project: Water Quality and Aquatic Wildlife Monitoring, 2006-7

    OpenAIRE

    Perry, William; Watson, Fred; Casagrande, Joel; Hanley, Charles

    2007-01-01

    This is a report to the California Department of Parks and Recreation. It describes water quality and aquatic invertebrate monitoring after the construction of the Carmel River Lagoon Enhancement Project. Included are data that have been collected for two years and preliminary assessment of the enhanced ecosystem. This report marks the completion of 3-years of monitoring water quality and aquatic habitat. The report adopts the same format and certain background text from previous ...

  17. Sustainable Seas Student Intertidal Monitoring Project, Duxbury Reef, Bolinas, CA

    Science.gov (United States)

    Soave, K.; Dean, A.; Prescutti, K.; Ball, O.; Chang, E.; Darakananda, K.; Jessup, K.; Poutian, J.; Schwalbe, H.; Storm, E.

    2008-12-01

    The Sustainable Seas Student Monitoring Project at the Branson School in Ross, CA has monitored Duxbury Reef in Bolinas, CA since 1999, in cooperation with the Farallones Marine Sanctuary Association and the Gulf of Farallones National Marine Sanctuary. Goals of the project include: 1) To monitor the rocky intertidal habitat and develop a baseline database of invertebrates and algal density and abundance; 2) To contribute to the conservation of the rocky intertidal habitat through education of students and visitors about intertidal species and requirements for maintaining a healthy, diverse intertidal ecosystem; 3) To increase stewardship in the Gulf of the Farallones National Marine Sanctuary; and 4) To contribute abundance and population data on key algae and invertebrate species to the national database, LiMPETS (Long Term Monitoring Program and Experiential Training for Students). Student volunteers complete an intensive training course on the natural history of intertidal invertebrates and algae, identification of key species, rocky intertidal ecology, interpretation and monitoring techniques, and history of the sanctuary. Students identify and count key invertebrate and algae species along two permanent transects (A and B), and using randomly determined points within a permanent 100 m2 area, three times per year (fall, winter, and late spring). Using the data collected since 2004, we will analyze the population densities of aggregating anemones, Anthopleura elegantissima, for seasonal abundance variations as well as long-term population trends. We will also follow the seasonal and long-term population fluctuations of red algal turf, Endocladia muricata and Gelidium coulteri, and black turban snails, Tegula funebralis. Comparing populations of turf algae and the herbivorous black turban snails gathered before and after the November 7, 2007 San Francisco Bay oil spill shows very little impact on the Duxbury Reef intertidal inhabitants. Future analyses will

  18. Divergent projections of future land use in the United States arising from different models and scenarios

    Science.gov (United States)

    Sohl, Terry L.; Wimberly, Michael; Radeloff, Volker C.; Theobald, David M.; Sleeter, Benjamin M.

    2016-01-01

    A variety of land-use and land-cover (LULC) models operating at scales from local to global have been developed in recent years, including a number of models that provide spatially explicit, multi-class LULC projections for the conterminous United States. This diversity of modeling approaches raises the question: how consistent are their projections of future land use? We compared projections from six LULC modeling applications for the United States and assessed quantitative, spatial, and conceptual inconsistencies. Each set of projections provided multiple scenarios covering a period from roughly 2000 to 2050. Given the unique spatial, thematic, and temporal characteristics of each set of projections, individual projections were aggregated to a common set of basic, generalized LULC classes (i.e., cropland, pasture, forest, range, and urban) and summarized at the county level across the conterminous United States. We found very little agreement in projected future LULC trends and patterns among the different models. Variability among scenarios for a given model was generally lower than variability among different models, in terms of both trends in the amounts of basic LULC classes and their projected spatial patterns. Even when different models assessed the same purported scenario, model projections varied substantially. Projections of agricultural trends were often far above the maximum historical amounts, raising concerns about the realism of the projections. Comparisons among models were hindered by major discrepancies in categorical definitions, and suggest a need for standardization of historical LULC data sources. To capture a broader range of uncertainties, ensemble modeling approaches are also recommended. However, the vast inconsistencies among LULC models raise questions about the theoretical and conceptual underpinnings of current modeling approaches. Given the substantial effects that land-use change can have on ecological and societal processes, there

  19. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. The Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment

  20. Study and project of a radiation monitoring system in ships

    International Nuclear Information System (INIS)

    Morgado, Mario Monteiro

    1998-01-01

    In this work we present the project and the development of a radiation detection system for use in ships, called RADINAC. This system was developed to measure the radiation in several points of the ship and to give the dose rates and total dose. The radioactive activity of the sea water is also measured. The project was based on a system developed in the middle of the seventies which is not working due to the lack of some mechanical and electronic components. The RADINAC system was developed in order to nationalize and modernize the old project. The detectors used are plastic scintillator to measure the sea water radioactive activity and ionization chambers to measure the dose rates. The nuclear instrumentation has only three imported items: acquisition data board, picoamperimeter and photomultiplier tube. All the other items are made in Brazil. With regard to the data acquisition, we used the Labwindows software to create the 'virtual instruments' in order to display the data on the computer monitor. (author)

  1. The SISMA Project: A pre-operative seismic hazard monitoring system.

    Science.gov (United States)

    Massimiliano Chersich, M. C.; Amodio, A. A. Angelo; Francia, A. F. Andrea; Sparpaglione, C. S. Claudio

    2009-04-01

    Galileian Plus is currently leading the development, in collaboration with several Italian Universities, of the SISMA (Seismic Information System for Monitoring and Alert) Pilot Project financed by the Italian Space Agency. The system is devoted to the continuous monitoring of the seismic risk and is addressed to support the Italian Civil Protection decisional process. Completion of the Pilot Project is planned at the beginning of 2010. Main scientific paradigm of SISMA is an innovative deterministic approach integrating geophysical models, geodesy and active tectonics. This paper will give a general overview of project along with its progress status and a particular focus will be put on the architectural design details and to the software implementation choices. SISMA is built on top of a software infrastructure developed by Galileian Plus to integrate the scientific programs devoted to the update of seismic risk maps. The main characteristics of the system may be resumed as follow: automatic download of input data; integration of scientific programs; definition and scheduling of chains of processes; monitoring and control of the system through a graphical user interface (GUI); compatibility of the products with ESRI ArcGIS, by mean of post-processing conversion. a) automatic download of input data SISMA needs input data such as GNSS observations, updated seismic catalogue, SAR satellites orbits, etc. that are periodically updated and made available from remote servers through FTP and HTTP. This task is accomplished by a dedicated user configurable component. b) integration of scientific programs SISMA integrates many scientific programs written in different languages (Fortran, C, C++, Perl and Bash) and running into different operating systems. This design requirements lead to the development of a distributed system which is platform independent and is able to run any terminal-based program following few simple predefined rules. c) definition and scheduling of

  2. Microcontroller based four-channel current readout unit for beam slit monitor

    International Nuclear Information System (INIS)

    Holikatti, A.C.; Puntambekar, T.A.; Pithawa, C.K.

    2009-01-01

    This paper describes the design and development of a microcontroller based four-channel current readout unit for Beam Slit Monitor (BSM) installed in Transport Line-1 of Indus Accelerator Complex. BSM is a diagnostic device consisting of two horizontal and two vertical blades, which can be moved independently in to the beam pipe to cut the beam transversely. The readout unit employs switched integrators with reset, hold and select switches and timing and control unit. It integrates the current output of the four blades of BSM and produces an output corresponding to the beam charge intercepted by the blade. The integrator outputs are then multiplexed and digitized using 12-bit ADC. Acquired digital data from ADC is stored into on-chip RAM of the microcontroller. The readout sequence is synchronized with the Microtron beam-timing signal. The timing of integration, hold and reset cycles is controlled by the microcontroller. The unit is connected on a serial link to the host computer in main control room. This unit has been integrated with the BSM system and is being used to obtain the electron beam profile. (author)

  3. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  4. PV Project Finance in the United States, 2016

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, David; Lowder, Travis; Schwabe, Paul

    2016-09-01

    This brief is a compilation of data points and market insights that reflect the state of the project finance market for solar photovoltaic (PV) assets in the United States as of the third quarter of 2016. This information can generally be used as a simplified benchmark of the costs associated with securing financing for solar PV as well as the cost of the financing itself (i.e., the cost of capital). Three sources of capital are considered -- tax equity, sponsor equity, and debt -- across three segments of the PV marketplace.

  5. Evaluation and monitoring of wild/natural steelhead trout production: project progress report, 1996; ANNUAL

    International Nuclear Information System (INIS)

    Leth, Brian D.; Holubetz, Terry; Nemeth, Doug

    2000-01-01

    This project was initiated to provide additional, and more definitive, information regarding wild steelhead Oncorhynchus mykiss populations in Idaho. Important streams for wild steelhead production were identified and selected for monitoring. Monitoring activities employed among streams varied, but generally included: aerial redd counts, placement of adult weirs, enumeration of juveniles through mask and snorkel counts, and emigrant trapping. This report details activities during the 1996 field season

  6. Mobile units for monitoring of radiation situation

    International Nuclear Information System (INIS)

    Drabova, D.; Filgas, R.; Cespirova, I.

    1995-01-01

    For the radiation monitoring network of the Czech Republic a prototype of the small system for dose rate measurements and nuclide activity estimates suitable for use in mobile units was designed and tested in National Radiation Protection Institute. The system consists of high purity Ge detector, multichannel analyzer, high pressure ionization chamber or proportional counter and portable computer working in multitask mode for storing and evaluating of the spectra as well as dose rate handling, recording, storing and searching and presentation. The information about actual position is provided by the global positioning system Garmin on-line connected to the computer. This information is used later on to create the maps of contamination using small desktop mapping (GIS) system. The system is designed to be used in measurements on foot, in car, with helicopter or small fixed wing aircraft. (J.K.)

  7. Monitored Retrievable Storage (MRS) facility project status

    International Nuclear Information System (INIS)

    Milner, R.A.; Trebules, V.W.; Blandford, J.B.

    1994-01-01

    1993 has been yet another year of major change in the Monitored Retrievable Storage (MRS) project. The change in administration has brought a new Secretary of Energy to the Department. Secretary O'Leary has brought a strong leadership background and fresh ideas to address the Department's many complex challenges, including the Civilian Radioactive Waste Management System (CRWMS). Dr. Daniel Dreyfus was named Director of the Office of Civilian Radioactive Waste Management. Mr. Richard Stallings has been named, as the new, Nuclear Waste Negotiator under the Nuclear Waste Policy Act, Amendments of 1987. The overall mission of the Office of Civilian Radioactive Waste Management (OCRWM) has not changed. OCRWM is tasked with finding technically sound, environmentally responsible and economically viable solutions to spent nuclear fuel and high-level radioactive waste storage and disposal

  8. The LIFE ProjectMonitoring of insects with public participation” (MIPP: aims, methods and conclusions

    Directory of Open Access Journals (Sweden)

    Giuseppe Maria Carpaneto

    2017-08-01

    Full Text Available The Life ProjectMonitoring of insects with public participation” (LIFE11 NAT/IT/000252 had as the main objective to develop and test methods for the monitoring of five beetle species listed in the Annexes of the Habitats Directive (92/43/EEC: Osmoderma eremita (hermit beetle, Scarabaeidae, Lucanus cervus (European stag beetle, Lucanidae, Cerambyx cerdo (great capricorn beetle, Cerambycidae, Rosalia alpina (rosalia longicorn, Cerambycidae and Morimus asper/funereus (morimus longicorn, Cerambycidae. The data gathered represent an important contribution to the monitoring of these target species in Italy. The methods developed for monitoring of the target species are intended for use by the local management authorities and staff of protected areas. These developed methods are the result of extensive fieldwork and ensure scientific validity, ease of execution and limited labour costs. The detailed description of methods and the results for each species are published in separate articles of this special issue of Nature Conservation. A second objective of the project was to gather faunistic data with a Citizen Science approach, using the web and a mobile application software (app specifically built for mobile devices. The validation of the records collected by the citizens was carried out by experts, based on photographs, which were obligatory for all records. Dissemination activities represented the principal way to contact and engage citizens for the data collection and also offered the possibility of providing information on topics such as Natura 2000, the Habitats Directive, the role of monitoring in nature conservation, the importance of forest ecosystems and the ecological role of the saproxylic insects. An innovative method tested during the project was the training of a dog for searching and monitoring the elusive hermit beetle; the trained dog also added a “curiosity” factor to attract public attention towards this rare insect and

  9. Research on horizontal displacement monitoring method of deep foundation pit based on laser projecting sensing technology

    Science.gov (United States)

    Liu, Peng; Xie, Shulin; Zhang, Lixiao; Zhou, Guangyi; Zhao, Xuefeng

    2018-03-01

    A certain level of horizontal displacement will occur during excavation or subsequent construction of deep foundation pit. If the support is improper and the horizontal displacement of the foundation pit is too large, it will cause collapse and even affect the buildings around the foundation pit, which will endanger people's life and property. Therefore, the horizontal displacement monitoring of deep foundation pit becomes more and more important. At present, the electronic total station is often used to monitor the horizontal displacement of the foundation pit, but this monitoring method is expensive, prone to accidental errors, and can not be used for real-time monitoring. Therefore, a method of monitoring the horizontal displacement of deep foundation pit by using laser projection sensing technique is proposed in this paper. The horizontal displacement of the foundation pit is replaced by the displacement of the laser spot emitted by the laser, and the horizontal displacement of the foundation pit can be obtained by identifying the displacement of the laser spot projected on the screen. A series of experiments show that the accuracy of this monitoring method meets the engineering requirements and greatly reduces the cost, which provides a new technology for the displacement monitoring of deep foundation pit.

  10. Wireless data management system for environmental monitoring in livestock buildings

    Directory of Open Access Journals (Sweden)

    James Gray

    2017-03-01

    Full Text Available The impact of air quality on the health, welfare and productivity of livestock needs to be considered, especially when livestock are kept in enclosed buildings. The monitoring of such environmental factors allows for the development of appropriate strategies to reduce detrimental effects of sub-optimal air quality on the respiratory health of both livestock and farmers. In 2009, an environmental monitoring system was designed, developed and tested that allowed for the monitoring of a number of airborne pollutants. One limitation of the system was the manual collection of logged data from each unit. This paper identifies limitations of the current environmental monitoring system and suggests a range of networking technologies that can be used to increase usability. Consideration is taken for the networking of environmental monitoring units, as well as the collection of recorded data. Furthermore, the design and development of a software system that is used to collate and store recorded environmental data from multiple farms is explored. In order to design such a system, simplified software engineering processes and methodologies have been utilised. The main steps taken in order to complete the project were requirements elicitation with clients, requirements analysis, system design, implementation and finally testing. The outcome of the project provided a potential prototype for improving the environmental monitoring system and analysis informing the benefit of the implementation.

  11. Guide on Project Web Access of SFR R and D and Technology Monitoring System

    International Nuclear Information System (INIS)

    Lee, Dong Uk; Won, Byung Chool; Lee, Yong Bum; Kim, Young In; Hahn, Do Hee

    2008-09-01

    The SFR R and D and technology monitoring system based on the MS enterprise project management is developed for systematic effective management of 'Development of Basic Key Technologies for Gen IV SFR' project which was performed under the Mid- and Long-term Nuclear R and D Program sponsored by the Ministry of Education, Science and Technology. This system is a tool for project management based on web access. Therefore this manual is a detailed guide for Project Web Access(PWA). Section 1 describes the common guide for using of system functions such as project server 2007 client connection setting, additional outlook function setting etc. The section 2 describes the guide for system administrator. It is described the guide for project management in section 3, 4

  12. Guide on Project Web Access of SFR R and D and Technology Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Uk; Won, Byung Chool; Lee, Yong Bum; Kim, Young In; Hahn, Do Hee

    2008-09-15

    The SFR R and D and technology monitoring system based on the MS enterprise project management is developed for systematic effective management of 'Development of Basic Key Technologies for Gen IV SFR' project which was performed under the Mid- and Long-term Nuclear R and D Program sponsored by the Ministry of Education, Science and Technology. This system is a tool for project management based on web access. Therefore this manual is a detailed guide for Project Web Access(PWA). Section 1 describes the common guide for using of system functions such as project server 2007 client connection setting, additional outlook function setting etc. The section 2 describes the guide for system administrator. It is described the guide for project management in section 3, 4.

  13. Brief introduction to project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Chen Jie

    1996-01-01

    The key points in development and engineering project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit are briefly introduced. The Gantt chart, some project management methods and experience are presented. The key points analysis along with the project procedure will be useful to the similar project

  14. Equilibrium II: Acids and Bases. Independent Learning Project for Advanced Chemistry (ILPAC). Unit P3.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on equilibrium is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit, which consists of two levels, focuses on the application of equilibrium principles to equilibria involving weak acids and bases, including buffer solutions and indicators. Level one uses Le Chatelier's…

  15. High altitude environmental monitoring: the SHARE project and CEOP-HE

    Science.gov (United States)

    Tartari, G.

    2009-04-01

    Mountain areas above 2,500 m a.s.l. constitute about 25% of the Earth's surface and play a fundamental role in the global water balance, while influencing global climate and atmospheric circulation systems. Several millions, including lowlanders, are directly affected by the impacts of climate change on glaciers and water resource distribution. Mountains and high altitude plateaus are subject to the highest rate of temperature increase (e.g., Tibetan Plateau) and are recognized as particularly vulnerable to the effects of climate change. In spite of this, the number of permanent monitoring sites in the major environmental networks decreases with altitude. On a sample of two hundred high altitude automatic weather stations located above 2,500 m a.s.l., less than 20% are over 4,000 m, while there are only 24 stations in the world that could be considered "complete" high altitude observatories. Furthermore, entire mountain areas are left uncovered, creating significant data gaps which make reliable modelling and forecasting nearly impossible. In response to these problems, Ev-K2-CNR has developed the project SHARE (Stations at High Altitude for Research on the Environment) with the support of the Italian government and in collaboration with UNEP. This integrated environmental monitoring and research project aims to improve knowledge on the local, regional and global consequences of climate change in mountain regions and on the influence of high elevations on climate, atmospheric circulation and hydrology. SHARE today boasts a network of 13 permanent monitoring stations between 2,165 m and 8,000 m. Affiliated researchers have produced over 150 scientific publications in atmospheric sciences, meteorology and climate, glaciology, limnology and paleolimnology and geophysics. SHARE network data is also contributed to international programs (UNEP-ABC, WMO-GAW, WCRP-GEWEX-CEOP, NASA-AERONET, ILTER, EU-EUSAAR, EU-ACCENT). Within this context, the CEOP-High Elevations (CEOP

  16. Assessment of knowledge and skills about growth monitoring amongst multipurpose workers in an ICDS project.

    Science.gov (United States)

    Kapil, U; Sood, A K; Gaur, D R; Bhasin, S

    1991-08-01

    Knowledge and skills amongst 34 multipurpose workers working in an ICDS project about growth monitoring was assessed using interview technique. All workers had correct knowledge about rationale of growth monitoring. A total of 73.5% and 94.1% had knowledge that flattened growth curve indicates no weight gain and descending growth indicates decrease in weight, respectively.

  17. The Vibration Monitoring of the Gascompressor Units with Application of Hurst's Statistics

    International Nuclear Information System (INIS)

    Zakharov, O V; Novichkov, S V; Kochetkov, A V

    2016-01-01

    The gascompressor units work in the unsteady regime which depends on many internal and external factors. For the solution of problems of control, management and forecasting the statistical assessment of a condition of object in real time according to noisy observations of one realization of stochastic process is carried out. The traditional spectral analysis on the basis of Fast Fourier Transformation in this case is inefficient if time scale is much less than duration, which is subject to the analysis. Therefore for monitoring of a condition of the equipment it is offered to use Hurst's statistics by means of which it is possible to investigate quantitatively law of development of a vibration signal and unambiguously to analyze a condition of the gascompressor units. Calculation of economic efficiency from introduction of such technology of monitoring will provide decrease on average by 2.5% of a consumption of gas and specific costs of capital repairs of the gascompressor units at the expense of increase in a total operating time by 20%. (paper)

  18. Projections in donor organs available for liver transplantation in the United States: 2014-2025.

    Science.gov (United States)

    Parikh, Neehar D; Hutton, David; Marrero, Wesley; Sanghani, Kunal; Xu, Yongcai; Lavieri, Mariel

    2015-06-01

    With the aging US population, demographic shifts, and obesity epidemic, there is potential for further exacerbation of the current liver donor shortage. We aimed to project the availability of liver grafts in the United States. We performed a secondary analysis of the Organ Procurement and Transplantation Network database of all adult donors from 2000 to 2012 and calculated the total number of donors available and transplanted donor livers stratified by age, race, and body mass index (BMI) group per year. We used National Health and Nutrition Examination Survey and Centers for Disease Control and Prevention historical data to stratify the general population by age, sex, race, and BMI. We then used US population age and race projections provided by the US Census Bureau and the Weldon Cooper Center for Public Service and made national and regional projections of available donors and donor liver utilization from 2014 to 2025. We performed sensitivity analyses and varied the rate of the rise in obesity, proportion of Hispanics, population growth, liver utilization rate, and donation after cardiac death (DCD) utilization. The projected adult population growth in the United States from 2014 to 2025 will be 7.1%. However, we project that there will be a 6.1% increase in the number of used liver grafts. There is marked regional heterogeneity in liver donor growth. Projections were significantly affected by changes in BMI, DCD utilization, and liver utilization rates but not by changes in the Hispanic proportion of the US population or changes in the overall population growth. Overall population growth will outpace the growth of available donor organs and thus potentially exacerbate the existing liver graft shortage. The projected growth in organs is highly heterogeneous across different United Network for Organ Sharing regions. Focused strategies to increase the liver donor pool are warranted. © 2015 American Association for the Study of Liver Diseases.

  19. Ontario Hydro's environmental monitoring program for HV [high voltage] transmission line projects

    International Nuclear Information System (INIS)

    Braekevelt, P.N.

    1991-01-01

    Responsible monitoring and control of environmental impacts is key to obtaining future needed approvals for new high voltage (HV) transmission line projects. Ontario Hydro's environmental monitoring program was developed as a highly structured, self-imposed monitoring system to relieve government agencies of the responsibility of developing a similar external program. The goal was to be self-policing. The historical development, program structure, standards, priority ratings, documentation, communication and computerization of the program is described. The most effective way to minimize environmental impacts is to avoid sensitive features at the route selection stage, well before any construction takes place. The environmental monitoring program is based on the following blueprint: each crew member is responsible for environmental protection; environmental problems are to be resolved at the lowest level possible; potential concerns should be resolved before they become problems; known problems should be dealt with quickly to minimize impacts; team members should work cooperatively; and formal and regular communication is emphasized

  20. Project SIMORAC: a wireless system for radiation monitoring in emergencies

    International Nuclear Information System (INIS)

    Gomez, D.; Serrano, J. L.; Cabrera, E.; Barbaran, J.; Llopis, L.; Diaz, M.

    2013-01-01

    The SIMORAC project includes a new system for Radiological monitoring using wireless sensor networks (RSIs), without infrastructure planning in emergency situations for a rapidly deployable by air or land, with the aim of providing a tool emergency teams capable of offering a real time x-ray map within the radius of action of an accident. Communication of quality at a great distance, resistance to weather, long autonomy and possibility of aerial deployment are some of the features of SIMORAC.

  1. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Keefe, MaryLouise; Carmichael, Richard W.; French, Rod A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1993-03-01

    This report covers the first year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary. The most crucial data for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available. A comprehensive fish health monitoring regimen was incorporated into the monitoring and evaluation study for Umatilla Hatchery. This is a unique feature of the Umatilla Hatchery evaluation project.

  2. EC MoDeRn Project: In-situ Demonstration of Innovative Monitoring Technologies for Geological Disposal - 12053

    Energy Technology Data Exchange (ETDEWEB)

    Breen, B.J. [NDA, Herdus House, Westlakes Science and Technology Park, Moor Row, Cumbria, CA24 3HU (United Kingdom); Garcia-Sineriz, J.L. [AITEMIN, c/Margarita Salas 14-Parque Leganes Tecnologico-Leganes, ES-28918, Madrid (Spain); Maurer, H. [ETH Zurich, ETH Honggerberg, CH-8093, Zurich (Switzerland); Mayer, S. [ANDRA, 1-7 rue Jean-Monnet, F-92298 Chatenay-Malabry cedex (France); Schroeder, T.J. [NRG, P.O. Box 25, NL-1755 ZG Petten (Netherlands); Verstricht, J. [EURIDICE EIG, c/o SCK.CEN, Boeretang 200, BE-2400 Mol (Belgium)

    2012-07-01

    Monitoring to provide information on the evolution of geological disposal presents several challenges. The 4-year, euros M 5, EC MoDeRn Project (http://www.modern-fp7.eu/), which commenced in 2009, addresses monitoring processes, state-of-the-art technology and innovative research and development of monitoring techniques. This paper discusses some of the key drivers for the development of innovative monitoring techniques and provides outlines of the demonstration programmes being conducted within MoDeRn. The aim is to develop these innovative monitoring techniques and to demonstrate them under realistic conditions present in underground laboratories. These demonstration projects, applying a range of different monitoring techniques, are being carried out at underground research facilities in different geological environments at HADES URL in Belgium (plastic clay), Bure in France (indurated clay) and at Grimsel Test Site (granite) in Switzerland. These are either built upon existing infrastructure (EC ESDRED Low pH shotcrete and TEM experiments at Grimsel; and PRACLAY experiment and underground galleries in HADES) or will be attached to infrastructure that is being developed and financed by resources outside of this project (mock-up disposal cell in Bure). At Grimsel Test Site, cross-hole and hole-to-tunnel seismic methods are being employed as a means to monitor induced changes in an artificially saturated bentonite wall confined behind a shotcrete plug. Recognising the limitations for travel-time tomography for monitoring a disposal cell, full waveform inversion techniques are being employed to enhance the capacity to monitor remote from the excavation. At the same Grimsel location, an investigation will be conducted of the potential for using a high frequency wireless (HFW) sensor network embedded within the barrier system; this will include the possibility of providing energy remotely to isolated sensors. At the HADES URL, the monitoring programme will utilise

  3. Projecting housing starts and softwood lumber consumption in the United States

    Science.gov (United States)

    Jeffrey P. Prestemon; David N. Wear; Karen L. Abt; Robert C. Abt

    2018-01-01

    New residential construction is a primary user of wood products in the United States; therefore, wood products projections require understanding the determinants of housing starts. We model quarterly US total, single-family, and multifamily housing starts with several model specifications, using data from 1979 to 2008, and evaluate their...

  4. The Satellite based Monitoring Initiative for Regional Air quality (SAMIRA): Project summary and first results

    Science.gov (United States)

    Schneider, Philipp; Stebel, Kerstin; Ajtai, Nicolae; Diamandi, Andrei; Horalek, Jan; Nemuc, Anca; Stachlewska, Iwona; Zehner, Claus

    2017-04-01

    We present a summary and some first results of a new ESA-funded project entitled Satellite based Monitoring Initiative for Regional Air quality (SAMIRA), which aims at improving regional and local air quality monitoring through synergetic use of data from present and upcoming satellite instruments, traditionally used in situ air quality monitoring networks and output from chemical transport models. Through collaborative efforts in four countries, namely Romania, Poland, the Czech Republic and Norway, all with existing air quality problems, SAMIRA intends to support the involved institutions and associated users in their national monitoring and reporting mandates as well as to generate novel research in this area. The primary goal of SAMIRA is to demonstrate the usefulness of existing and future satellite products of air quality for improving monitoring and mapping of air pollution at the regional scale. A total of six core activities are being carried out in order to achieve this goal: Firstly, the project is developing and optimizing algorithms for the retrieval of hourly aerosol optical depth (AOD) maps from the Spinning Enhanced Visible and InfraRed Imager (SEVIRI) onboard of Meteosat Second Generation. As a second activity, SAMIRA aims to derive particulate matter (PM2.5) estimates from AOD data by developing robust algorithms for AOD-to-PM conversion with the support from model- and Lidar data. In a third activity, we evaluate the added value of satellite products of atmospheric composition for operational European-scale air quality mapping using geostatistics and auxiliary datasets. The additional benefit of satellite-based monitoring over existing monitoring techniques (in situ, models) is tested by combining these datasets using geostatistical methods and demonstrated for nitrogen dioxide (NO2), sulphur dioxide (SO2), and aerosol optical depth/particulate matter. As a fourth activity, the project is developing novel algorithms for downscaling coarse

  5. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  6. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    Science.gov (United States)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  7. Off-site environmental monitoring report: Radiation monitoring around United States Nuclear Test areas, Calendar year 1986

    International Nuclear Information System (INIS)

    Patzer, R.G.; Fontana, C.A.; Grossman, R.F.; Black, S.C.; Dye, R.E.; Smith, D.D.; Thome', D.J.; Mullen, A.A.

    1987-05-01

    The principal activity at the NTS is testing of nuclear devices, though other related projects are also conducted. The principal activities of the Off-Site Radiological Safety Program are routine environmental monitoring for radioactive materials in various media and for radiation in areas which may be affected by nuclear tests; and protective actions in support of the nuclear testing program. These are conducted to document compliance with standards, to identify trends, and to provide information to the public. 28 refs., 37 figs., 30 tabs

  8. Manitoba Hydro long-term high-voltage transmission line magnetic field monitoring project

    International Nuclear Information System (INIS)

    Wong, P.S.; Ng, C.K.

    2008-01-01

    As part of the licensing process to construct a new 230 kV transmission line on an existing right-of-way in Manitoba, an electrical effects study was conducted in 1998. The study was part of the environmental assessment program crucial in obtaining government approval to construct the line. Some residents living adjacent to the new transmission circuit expressed concerns about alleged adverse health effects associated with long-term exposure to magnetic fields from high voltage transmission lines. In order to verify the accuracy of the predicted magnetic field levels submitted to the regulatory body in the the electrical effects study and to instill confidence in the residents of the affected communities, a three-year magnetic monitoring project was conducted between 2003 and 2005 along the right-of-way after the new 230kV transmission line was energized by Manitoba Hydro. This paper described the monitoring program, with reference to location; equipment; data analysis; and discussion of results. It was concluded that the long-term monitoring project demonstrated that the magnetic field prediction methodology was well understood and accurate, and provided valuable long-term magnetic field characteristics at the edge of the right-of-way. In addition, when there is opposition to a transmission line, public consultation and education were found to be the best options to arrive at a solution. 3 refs., 1 tab., 12 figs

  9. Project GRETE: evaluation of non destructive testing techniques for monitoring of material degradation

    International Nuclear Information System (INIS)

    Coste, J.F.

    2001-01-01

    The material aging of major critical components of nuclear installations due to in-service conditions may lead to a degradation of their mechanical characteristics. The early detection of material changes and their monitoring using innovative non destructive testing techniques would allow to plan actions in order to prevent the apparition of macroscopic damage (e.g. cracks). One major difficulty in using these particular techniques is to correlate the changes in the measured NDT signals to the microstructural changes in the material due to aging. This problem may be solved through careful microstructural examinations of the material damage. The objective of the project GRETE is to illustrate the potential use of NDT techniques for the monitoring of material degradation through two examples: neutron irradiation of reactor pressure vessel steel and thermal fatigue of piping. The purpose of this paper is to present the project and its programme of work. (author)

  10. Obesity: A United States Strategic Imperative

    Science.gov (United States)

    2013-04-01

    States Department of Veterans Affairs 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) Dr. Thomas ...Army Ms. Karen Malebranche United States Department of Veterans Affairs Project Adviser Dr. Thomas Williams U.S. Army War...per American has increased by 57 pounds per year ( poultry representing 46 pounds).86 Surprisingly however, the percentage of calories from meat

  11. Household environmental monitoring project, volume I : main report, volume 2 : appendices

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, J.; Goemans, M.; Goemans, P.C.; Wisniowski, A. [Jane Thompson Architect, Ottawa, ON (Canada); Fugler, D. [Canada Mortgage and Housing Corp., Ottawa, ON (Canada)

    2006-01-15

    Environmentally sustainable behaviour can be motivated by providing homeowners with a clear picture of their environmental impact, tangible reasons for improvement, and tailored solutions. This report presented the results of a study that established a study group of 20 households in an 85-year old community near downtown Ottawa, Ontario to test the above hypothesis. Each household completed surveys about environmental attitudes and household practices. Each household also tracked home heating, electricity and water consumption, and vehicle usage and waste generation over a monitoring period of one week. This report described the study in detail and presented the research plan and methods. It provided a review of related literature, including motivational techniques for encouraging sustainable behaviour; environmental monitoring tools including design tools, global impact assessment tools, federal environmental reduction tools and strategies; analyses of environmentally sustainable projects; and resource conservation techniques and manuals. The report also discussed the selection of the study group; development of monitoring method and forms; household monitoring; household assessment and reporting; community initiatives; and assessment of following year results. It was concluded that the research technique successfully produced reductions in environmental impact among the study group. refs., tabs., figs.

  12. STRATEGY AND PLANNING - PROJECT FOR MONITORING STRICTO SENSU POSTGRADUATE ALUMNI

    Directory of Open Access Journals (Sweden)

    Emerson Antonio Maccari

    2014-07-01

    Full Text Available The Coordination of Improvement of Higher Education Personnel (CAPES has been contributing to the development of post-graduate studies in Brazil, through its system of evaluation. Lately, CAPES signaled the importance of follow the professional performance of the alumni as a way to measure the quality of courses. One difficulty reported by institutions that intend to recognize the trajectory of its graduates is to compile a lot of isolated and outdated data. In order to structure the data collection and to assist educational managers in decision making, we propose the development of a system that enables the evolution of the students and alumni professional career, in order to diagnose the influence of the courses. Based on literature review, this study presents an analysis and makes recommendations about the Monitoring Alumni Project planning. As a result, it is expected that the analysis will serve as a driver for conducting the project, aiming to contribute to the academic reflections, and in practice, contribute to improve educational projects quality.

  13. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    International Nuclear Information System (INIS)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans

  14. Unit-based functional IDDT testing for aging degradation monitoring in a VLIW processor

    NARCIS (Netherlands)

    Zhao, Yong; Kerkhoff, Hans G.

    2015-01-01

    In this paper, functional unit-based IDDT testing has been applied for a 90nm VLIW processor to monitor its aging degradation. This technique can provide health data for reliability evaluation as used in e.g. prognostic software for lifetime prediction. The test-program development based on the

  15. United States-Mexico Border Diabetes Prevalence Survey: lessons learned from implementation of the project.

    Science.gov (United States)

    de Cosío, Federico G; Díaz-Apodaca, Beatriz A; Ruiz-Holguín, Rosalba; Lara, Agustín; Castillo-Salgado, Carlos

    2010-09-01

    This paper reviews and discusses the main procedures and policies that need to be followed when designing and implementing a binational survey such as the United States of America (U.S.)-Mexico Border Diabetes Prevalence Study that took place between 2001 and 2002. The main objective of the survey was to determine the prevalence of diabetes in the population 18 years of age or older along U.S.-Mexico border counties and municipalities. Several political, administrative, financial, legal, and cultural issues were identified as critical factors that need to be considered when developing and implementing similar binational projects. The lack of understanding of public health practices, implementation of existing policies, legislation, and management procedures in Mexico and the United States may delay or cancel binational research, affecting the working relation of both countries. Many challenges were identified: multiagency/multifunding, ethical/budget clearances, project management, administrative procedures, laboratory procedures, cultural issues, and project communications. Binational projects are complex; they require coordination between agencies and institutions at federal, state, and local levels and between countries and need a political, administrative, bureaucratic, cultural, and language balance. Binational agencies and staff should coordinate these projects for successful implementation.

  16. Inpatient Dialysis Unit Project Development: Redesigning Acute Hemodialysis Care.

    Science.gov (United States)

    Day, Jennifer

    2017-01-01

    Executive leaders of an acute care hospital performed a market and financial analysis, and created a business plan to establish an inpatient hemodialysis unit operated by the hospital to provide safe, high-quality, evidence-based care to the population of individuals experiencing end stage renal disease (ESRD) within the community. The business plan included a SWOT (Strengths - Weaknesses - Opportunities - Threats) analysis to assess advantages of the hospital providing inpatient hemodialysis services versus outsourcing the services with a contracted agency. The results of the project were a newly constructed tandem hemodialysis room and an operational plan with clearly defined key performance indicators, process improvement initiatives, and financial goals. This article provides an overview of essential components of a business plan to guide the establishment of an inpatient hemodialysis unit. Copyright© by the American Nephrology Nurses Association.

  17. Introduction of a prehospital critical incident monitoring system--pilot project results.

    Science.gov (United States)

    Stella, Julian; Davis, Anna; Jennings, Paul; Bartley, Bruce

    2008-01-01

    Hospital medical incident monitoring improves preventable morbidity and mortality rates. Error management systems have been adopted widely in this setting. Data relating to incident monitoring in the prehospital setting is limited. Implementation of an incident monitoring process in a prehospital setting. This is a prospective, descriptive study of the pilot phase of the implementation of an incident monitoring process in a regional prehospital setting, with a focus on trauma care. Paramedics and emergency department staff submitted anonymous incident reports, and a chart review was performed on patients who met major trauma criteria. Selected trauma cases were analyzed by a structured interview/debriefing process to elucidate undocumented incidents. A project committee coded and logged all incidents and developed recommendations. Of 4,429 ambulance responses, 41 cases were analyzed. Twenty-four (58.5%; 95% CI = 49.7-67.4%) were reported anonymously, and the rest were major trauma patients. A total of 77 incidents were identified (mean per case = 1.8; CI = 1.03-2.57). Anonymous cases revealed 26 incidents (mean = 1.1; CI = 0.98-1.22); eight trauma debriefings revealed 38 incidents (mean = 4.8; CI = 0.91-8.69) and nine trauma chart reviews revealed 13 incidents (mean = 1.6; CI = 1.04-2.16). A total of 56 of 77 (72.7%; CI = 65.5-80.0%) incidents related to system inadequacies, and 15 (57.7%; CI = 46.7-68.6%) anonymously reported incidents related to resource problems. A total of 35 of 77 (45.5%; CI = 40.4-50.5%) incidents had minimal or no impact on the patients' outcomes. Thirty-four of 77 (44.2%; CI = 39.3-49.1%) incidents were considered mitigated by circumstance. Incident monitoring led to generalized feedback in most cases (65 of 77; 84.4%; CI = 77.6-91.3%); in three cases (3.9%; CI = 3.7-4.1%), specific education occurred; two cases were reported to an external body (2.6%; CI = 2.5-2.7%); three cases resulted in remedial action (3.9%; CI = 3.7-4.1%); four for

  18. Status and understanding of groundwater quality in the Cascade Range and Modoc Plateau study unit, 2010: California GAMA Priority Basin Project

    Science.gov (United States)

    Fram, Miranda S.; Shelton, Jennifer L.

    2015-01-01

    Groundwater quality in the Cascade Range and Modoc Plateau study unit was investigated as part of the California State Water Resources Control Board’s Groundwater Ambient Monitoring and Assessment (GAMA) Program Priority Basin Project. The study was designed to provide a statistically unbiased assessment of untreated groundwater quality in the primary aquifer system. The depth of the primary aquifer system for the Cascade Range and Modoc Plateau study unit was delineated by the depths of the screened or open intervals of wells in the State of California’s database of public-supply wells. Two types of assessments were made: a status assessment that described the current quality of the groundwater resource, and an understanding assessment that made evaluations of relations between groundwater quality and potential explanatory factors representing characteristics of the primary aquifer system. The assessments characterize the quality of untreated groundwater, not the quality of treated drinking water delivered to consumers by water distributors.

  19. The application and development on radiation monitoring microcomputer management system in design of a certain project

    International Nuclear Information System (INIS)

    Zhang Hongyou

    1993-01-01

    A scheme of a radiation monitoring system with a RMMMS (Radiation Monitoring Microcomputer Management System) has been designed for the first time in the radiation protection design of a certain nuclear projection undertaken by the BINE (Beijing Institute of Nuclear Engineering). Meanwhile, we accepted the research task of the RMMMS that can manage 40 monitoring channel. The key factors of radiation monitors, microcomputer, information management and systematic design method are considered in the development of the RMMMS. This paper presents briefly the scheme and functions of the RMMMS

  20. Monitoring of insects with public participation (MIPP; EU LIFE project 11 NAT/IT/000252: overview on a citizen science initiative and a monitoring programme (Insecta: Coleoptera; Lepidoptera; Orthoptera

    Directory of Open Access Journals (Sweden)

    Franco Mason

    2015-06-01

    Full Text Available The LIFE project “MIPP” - Monitoring of Insects with Public Participation (11 NAT/IT/000252 is focused on selected insect species (five Coleoptera, three Lepidoptera, one Orthoptera, all included in the annexes II and IV of the Habitats Directive (HD 92/43/EEC. One important aim is a citizen science initiative where every person may become a citizen scientist and collect faunistic data on the above species throughout Italy. Another objective of the project MIPP is the development of standard methods for monitoring the conserva- tion status of the five target beetle species. One innovative method employed is a sniffer-dog (“Osmodog”, trained to find the rare and endangered hermit beetle, Osmoderma eremita, which lives in veteran, hollow trees. The dog detects the strong smell of mature peach produced by adult males and an odor produced by the larvae. Another objective of the project MIPP is the dissemination of topics such as HD, Natura 2000, importance of dead-wood, Life projects, insect monitoring and conservation.

  1. Improvements in routine internal monitoring - An overview of the IDEA project

    International Nuclear Information System (INIS)

    Schmitzer, C.; Fischer, H.; Andrasi, A.; Bouvier, C.; Carlan, L.; Franck, D.; Hollriegl, V.; Li, W. B.; Oeh, U.; Ritt, J.; Roth, P.; Wahl, W.; Zombori, P.

    2007-01-01

    The IDEA project aimed to improve the assessment of incorporated radionuclides through developments of advanced in vivo and bioassay monitoring techniques and making use of such enhancements for improvements in routine monitoring. Many of these findings are not new in the sense that they are being already employed in advanced laboratories or for specialised applications. The primary goal was to categorise those new developments regarding their potential and eligibility for the routine monitoring community. Attention has been given to in vivo monitoring techniques with respect to detector characteristics and measurement geometry to improve measurement efficiency with special attention to low energy gamma emitters. Calibration - specifically supported by or through methods of numerical simulation - have been carefully analysed to reduce overall measurement uncertainties and explore ways to accommodate the individual variability based on characteristic features of a given person. For bioassay measurements at low detection limits, inductively coupled plasma mass spectroscopy offers significant advantages both in accuracy, speed, and sample preparation. Specifically, the determination of U and Th in urine and the associated models have been investigated. Finally, the scientific achievements have been analysed regarding their potential to offer benefits for routine monitoring. These findings will be presented in greater detail in other papers at this conference, whereas this paper intends to give an overview and put both the scientific achievements as well as the derived benefits into perspective. (authors)

  2. Improvements in routine internal monitoring - an overview of the IDEA project

    International Nuclear Information System (INIS)

    Schmitzer, C.; Fischer, H.; Schlagbauer, M.; Bouvier, C.; Carlan, L.; Franck, D.; Ritt, J.; Hoellriegl, V.; Li, W.B.; Oeh, U.; Roth, P.; Wahl, W.; Andrasi, A.; Zombori, P.

    2005-01-01

    Full text: The IDEA project aimed to improve the assessment of incorporated radionuclides through developments of advanced in-vivo and bioassay monitoring techniques and making use of such enhancements for improvements in routine monitoring. Many of those findings are not new in the sense that they are being already employed in advanced laboratories or for specialized applications. The primary goal was to categorize those new developments regarding their potential and eligibility for the routine monitoring community. Attention has been given to in-vivo monitoring techniques with respect to detector characteristics and measurement geometry to improve measurement efficiency with special attention to low energy gamma emitters. Calibration - specifically supported by or through methods of numerical simulation - have been carefully analyzed to reduce overall measurement uncertainties and explore ways to accommodate the individual variability based on characteristic features of a given person. For bioassay measurements at low detection limits, inductively coupled plasma mass spectroscopy offers significant advantages both in accuracy, speed, and sample preparation. Specifically, the determination of U and Th in urine and the associated models have been investigated. Finally, the scientific achievements have been analyzed regarding their potential to offer benefits for routine monitoring. These findings will be presented in greater detail in other papers at this conference, whereas this paper intends to give an overview and put both the scientific achievements as well as the derived benefits into perspective. (author)

  3. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19

    The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These

  4. Project Monitor: Part II. Conservation in small business: an exploratory study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hammond, P Y

    1979-08-01

    Project Monitor examined the energy conservation attitude and behavior of small samples of small business owners/operators in Allegheny County, Pennsylvania, focusing on manufacturing concerns and retailers. Section I reports the findings on the energy conserving behavior of 92 smaller manufacturers and Section II identifies the factors which affect decision making concerning energy consuming activities by the owners/operators of 94 small retail establishments. In each, the impact of Project Pacesetter and of the coal strike and the general energy situation is considered. (MCW)

  5. Environmental Monitoring - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Davy, Thomas (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    The purpose of this report is to describe the environmental monitoring measures performed for the Lillgrund Offshore Wind Farm and to summarize the results and conclusions. Construction work started in 2006 and the plant was energized in December 2007. At the time of construction Lillgrund was the third largest wind farm offshore in the world and the first large offshore wind farm in Sweden. The purpose of the environmental monitoring is to ensure that there are no negative impacts on the environment stemming from construction of the Lillgrund wind farm as well as to ensure that the conditions stated by the authorities and the Company's commitments are met. The aim is also to collect more information and knowledge on the possible environmental impact for future offshore wind farm projects. For the Lillgrund project, all monitoring programs were included in one document, Monitoring Program - Lillgrund. It was included as part of the procedures to ensure that the Swedish legal requirements on operators control were followed. The authorities approved the document before construction started. The monitoring measures performed during the construction phase included: - A feedback and monitoring program on dredging and spillage; - A feedback and monitoring program on flora and fauna; - Studies and inspections of the refilling and re-establishment of the sea bottom; - Procedure for operators control. The mean measured sediment spillage, as part of the monitoring program on dredging and spillage, varied between 4.6 - 4.8% depending on dredger used. The maximum value allowed by the conditions is 5%. In general, the calculated values for suspended material were limited and the critical value of 0.01 kg/m3 was exceeded only in minor areas for a very limited time. No corrective actions were required. The deposition of sediment was very low and even at the most effected sites it was only just over 1 mm. The largest dredging volumes were for the foundation work, in total 82

  6. Web based concept project for information and communication of monitoring policy and techniques

    International Nuclear Information System (INIS)

    Levy, D. S.; Sordi, G. M. A. A.

    2014-08-01

    Information and Communication Technology (ICT) is growing in Brazil and worldwide. The servers processing power added to the technology of relational databases allow to integrate information from different sources, enabling complex queries with reduced response time. We believe that the use of information technology for the radiological protection programs for human activities shall help greatly the radioactive facility that requires such use. Therefore, this project aims the informatization of the monitoring policy and techniques in Portuguese, providing Brazilian radioactive facilities a complete repository for research, consultation and information in a quick, integrated and efficient way. In order to meet national and international standards, the development of this project includes concepts, definitions and theory about monitoring procedures in order to interrelate information, currently scattered in several publications and documents, in a consistent and appropriate manner. The Web platform tools and functionalities were developed according to our target public needs, regarding new possibilities of media, like mobile access, feeds of content and information sharing. Moreover, taking into account this is a pioneer project with the prospect of long-term use, our challenge involves the combination of multiple computer technologies that allows a robust, effective, and flexible system, which can be easily adapted according to future technological innovations. This pioneer project shell help greatly both radioactive facilities and researchers, and it is our target to make it an international reference for Portuguese Spoken countries. (Author)

  7. Web based concept project for information and communication of monitoring policy and techniques

    Energy Technology Data Exchange (ETDEWEB)

    Levy, D. S.; Sordi, G. M. A. A., E-mail: info@uniprorad.com.br [Instituto de Pesquisas Energeticas e Nucleares / CNEN, Av. Lineu Prestes 2242, Cidade Universitaria, 05508-000 Sao Paulo (Brazil)

    2014-08-15

    Information and Communication Technology (ICT) is growing in Brazil and worldwide. The servers processing power added to the technology of relational databases allow to integrate information from different sources, enabling complex queries with reduced response time. We believe that the use of information technology for the radiological protection programs for human activities shall help greatly the radioactive facility that requires such use. Therefore, this project aims the informatization of the monitoring policy and techniques in Portuguese, providing Brazilian radioactive facilities a complete repository for research, consultation and information in a quick, integrated and efficient way. In order to meet national and international standards, the development of this project includes concepts, definitions and theory about monitoring procedures in order to interrelate information, currently scattered in several publications and documents, in a consistent and appropriate manner. The Web platform tools and functionalities were developed according to our target public needs, regarding new possibilities of media, like mobile access, feeds of content and information sharing. Moreover, taking into account this is a pioneer project with the prospect of long-term use, our challenge involves the combination of multiple computer technologies that allows a robust, effective, and flexible system, which can be easily adapted according to future technological innovations. This pioneer project shell help greatly both radioactive facilities and researchers, and it is our target to make it an international reference for Portuguese Spoken countries. (Author)

  8. Emergency Management and Radiation Monitoring in Nuclear and Radiological Accidents. Summary Report on the NKS Project EMARAD

    International Nuclear Information System (INIS)

    Lahtinen, J.

    2006-04-01

    In order to manage various nuclear or radiological emergencies the authorities must have pre-prepared plans. The purpose of the NKS project EMARAD (Emergency Management and Radiation Monitoring in Nuclear and Radiological Accidents) was to produce and gather various data and information that could be useful in drawing up emergency plans and radiation monitoring strategies. One of the specific objectives of the project was to establish a www site that would contain various radiation-threat and radiation-monitoring related data and documents and that could be accessed by all Nordic countries. Other important objectives were discussing various factors affecting measurements in an emergency, efficient use of communication technology and disseminating relevant information on such topics as urban dispersion and illicit use of radiation. The web server is hosted by the Radiation and Nuclear Safety Authority (STUK) of Finland. The data stored include pre-calculated consequence data for nuclear power plant accidents as well as documents and presentations describing e.g. general features of monitoring strategies, the testing of the British urban dispersion model UDM and the scenarios and aspects related to malicious use of radiation sources and radioactive material. As regards the last item mentioned, a special workshop dealing with the subject was arranged in Sweden in 2005 within the framework of the project. (au)

  9. Life assessment and emissions monitoring of Indian coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    At the request of the Pittsburgh Energy Technology Center (PETC) of the United States Department of Energy (USDOE), the traveler, along with Dr. R. P. Krishnan, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee spent three weeks in India planning and performing emissions monitoring at the coal-fired Vijayawada Thermal Power Station (VTPS). The coordination for the Indian participants was provided by BHEL, Trichy and CPRI, Bangalore. The trip was sponsored by the PETC under the United States Agency for International Development (USAID)/Government of India (GOI)P Alternate Energy Resources Development (AERD) Project. The AERD Project is managed by PETC, and ORNL is providing the technical coordination and support for four coal projects that are being implemented with BHEL, Trichy. The traveler, after briefing the USAID mission in New Delhi visited BHEL, Trichy and CPRI, Bangalore to coordinate and plan the emissions test program. The site selection was made by BHEL, CPRI, TVA, and PETC. Monitoring was performed for 4 days on one of the 4 existing 210 MW coal-fired boilers at the VTPS, 400 km north of Madras, India.

  10. Protocols for Monitoring Habitat Restoration Projects in the Lower Columbia River and Estuary

    Energy Technology Data Exchange (ETDEWEB)

    Roegner, G. Curtis; Diefenderfer, Heida L.; Borde, Amy B.; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Zimmerman, Shon A.; Johnson, Gary E.

    2008-04-25

    Protocols for monitoring salmon habitat restoration projects are essential for the U.S. Army Corps of Engineers' environmental efforts in the Columbia River estuary. This manual provides state-of-the science data collection and analysis methods for landscape features, water quality, and fish species composition, among others.

  11. 2008 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-03-01

    This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of the CNTA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site during fiscal year 2008. This is the second groundwater monitoring report prepared by DOE-LM for the CNTA.

  12. 2008 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443

    International Nuclear Information System (INIS)

    2009-01-01

    This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of the CNTA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site during fiscal year 2008. This is the second groundwater monitoring report prepared by DOE-LM for the CNTA

  13. Evaluating Stream Restoration Projects: What Do We Learn from Monitoring?

    Directory of Open Access Journals (Sweden)

    Zan Rubin

    2017-02-01

    Full Text Available Two decades since calls for stream restoration projects to be scientifically assessed, most projects are still unevaluated, and conducted evaluations yield ambiguous results. Even after these decades of investigation, do we know how to define and measure success? We systematically reviewed 26 studies of stream restoration projects that used macroinvertebrate indicators to assess the success of habitat heterogeneity restoration projects. All 26 studies were previously included in two meta-analyses that sought to assess whether restoration programs were succeeding. By contrast, our review focuses on the evaluations themselves, and asks what exactly we are measuring and learning from these evaluations. All 26 studies used taxonomic diversity, richness, or abundance of invertebrates as biological measures of success, but none presented explicit arguments why those metrics were relevant measures of success for the restoration projects. Although changes in biodiversity may reflect overall ecological condition at the regional or global scale, in the context of reach-scale habitat restoration, more abundance and diversity may not necessarily be better. While all 26 studies sought to evaluate the biotic response to habitat heterogeneity enhancement projects, about half of the studies (46% explicitly measured habitat alteration, and 31% used visual estimates of grain size or subjectively judged ‘habitat quality’ from protocols ill-suited for the purpose. Although the goal of all 26 projects was to increase habitat heterogeneity, 31% of the studies either sampled only riffles or did not specify the habitats sampled. One-third of the studies (35% used reference ecosystems to define target conditions. After 20 years of stream restoration evaluation, more work remains for the restoration community to identify appropriate measures of success and to coordinate monitoring so that evaluations are at a scale capable of detecting ecosystem change.

  14. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States). Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  15. A comparative analysis of business structures suitable for farmer-owned wind power projects in the United States

    International Nuclear Information System (INIS)

    Bolinger, Mark; Wiser, Ryan

    2006-01-01

    For years, farmers in the United States have looked with envy on their European counterparts' ability to profitably farm the wind through ownership of distributed, utility-scale wind projects. Only within the past few years, however, has farmer- or community-owned wind power development become a reality in the United States. The primary hurdle to this type of development in the United States has been devising and implementing suitable business and legal structures that enable such projects to take advantage of tax-based federal incentives for wind power. This article discusses the limitations of such incentives in supporting farmer- or community-owned wind projects, describes four ownership structures that potentially overcome such limitations, and finally conducts comparative financial analysis on those four structures, using as an example a hypothetical 1.5 MW farmer-owned project located in the state of Oregon. We find that material differences in the competitiveness of each structure do exist, but that choosing the best structure for a given project will largely depend on the conditions at hand; e.g., the ability of the farmer(s) to utilize tax credits, preference for individual versus 'cooperative' ownership, and the state and utility service territory in which the project will be located

  16. Experimental conditions and monitoring items of the prototype repository project (PRP). Research document

    International Nuclear Information System (INIS)

    Sugita, Yutaka; Ito, Akira; Kawakami, Susumu

    2003-03-01

    Various experiments are ongoing in the underground research facility 'the Hard Rock Laboratory (HRL)' of SKB in Sweden for the geological disposal of the high-level radioactive waste. International joint project Prototype Repository Project (PRP) is one of the experiments in the HRL which has some engineered barrier systems and to study the coupled behavior happening in and around the engineered barrier system. JNC has joined this international joint project PRP to obtain the information of the coupled behavior on such systematic engineered barrier system and to apply the JNC's coupled THMC analytical code to the prediction and back analysis of the PRP. The analytical code will be verified through these analyses in this project. JNC can apply the verified analytical code to assess the coupled behavior in Japan. This report summarizes the experimental conditions and monitoring items of the PRP. (author)

  17. Final Technical Report: Development of Post-Installation Monitoring Capabilities

    Energy Technology Data Exchange (ETDEWEB)

    Polagye, Brian [University of Washington

    2014-03-31

    The development of approaches to harness marine and hydrokinetic energy at large-scale is predicated on the compatibility of these generation technologies with the marine environment. At present, aspects of this compatibility are uncertain. Demonstration projects provide an opportunity to address these uncertainties in a way that moves the entire industry forward. However, the monitoring capabilities to realize these advances are often under-developed in comparison to the marine and hydrokinetic energy technologies being studied. Public Utility District No. 1 of Snohomish County has proposed to deploy two 6-meter diameter tidal turbines manufactured by OpenHydro in northern Admiralty Inlet, Puget Sound, Washington. The goal of this deployment is to provide information about the environmental, technical, and economic performance of such turbines that can advance the development of larger-scale tidal energy projects, both in the United States and internationally. The objective of this particular project was to develop environmental monitoring plans in collaboration with resource agencies, while simultaneously advancing the capabilities of monitoring technologies to the point that they could be realistically implemented as part of these plans. In this, the District was joined by researchers at the Northwest National Marine Renewable Energy Center at the University of Washington, Sea Mammal Research Unit, LLC, H.T. Harvey & Associates, and Pacific Northwest National Laboratory. Over a two year period, the project team successfully developed four environmental monitoring and mitigation plans that were adopted as a condition of the operating license for the demonstration project that issued by the Federal Energy Regulatory Commission in March 2014. These plans address nearturbine interactions with marine animals, the sound produced by the turbines, marine mammal behavioral changes associated with the turbines, and changes to benthic habitat associated with colonization

  18. First annual report RCRA post-closure monitoring and inspections for the U-3fi waste unit. Final report, July 1995--October 1996

    International Nuclear Information System (INIS)

    Emer, D.F.

    1997-01-01

    This annual Neutron Soil Moisture Monitoring report provides an analysis and summary for site inspections, meteorological information, and neutron soil moisture monitoring data obtained at the U-3fi RCRA Unit, located in Area 3 of the Nevada Site (NTS), Nye County, Nevada during the July 1995 to October 1996 period. Inspections of the U-3fi RCRA Unit are conducted to determine and document the physical condition of the covers, facilities, and any unusual conditions that could impact the proper operation of the waste unit closure. The objective of the neutron logging is to monitor the soil moisture conditions along the 420 ft ER3-3 borehole and detect changes that may be indicative of moisture movement in the regulated interval. This is the first annual report on the U-3fi closure and includes the first year baseline monitoring data as well as one quarter of compliance monitoring data

  19. Radiation safety assessment and development of environmental radiation monitoring technology

    CERN Document Server

    Choi, B H; Kim, S G

    2002-01-01

    The Periodic Safety Review(PSR) of the existing nuclear power plants is required every ten years according to the recently revised atomic energy acts. The PSR of Kori unit 1 and Wolsong unit 1 that have been operating more than ten years is ongoing to comply the regulations. This research project started to develop the techniques necessary for the PSR. The project developed the following four techniques at the first stage for the environmental assessment of the existing plants. 1) Establishment of the assessment technology for contamination and accumulation trends of radionuclides, 2) alarm point setting of environmental radiation monitoring system, 3) Development of Radiation Safety Evaluation Factor for Korean NPP, and 4) the evaluation of radiation monitoring system performance and set-up of alarm/warn set point. A dynamic compartment model to derive a relationship between the release rates of gas phase radionuclides and the concentrations in the environmental samples. The model was validated by comparing ...

  20. An assessment of seismic monitoring in the United States; requirement for an Advanced National Seismic System

    Science.gov (United States)

    ,

    1999-01-01

    This report assesses the status, needs, and associated costs of seismic monitoring in the United States. It sets down the requirement for an effective, national seismic monitoring strategy and an advanced system linking national, regional, and urban monitoring networks. Modernized seismic monitoring can provide alerts of imminent strong earthquake shaking; rapid assessment of distribution and severity of earthquake shaking (for use in emergency response); warnings of a possible tsunami from an offshore earthquake; warnings of volcanic eruptions; information for correctly characterizing earthquake hazards and for improving building codes; and data on response of buildings and structures during earthquakes, for safe, cost-effective design, engineering, and construction practices in earthquake-prone regions.

  1. ERATOSTHENES: excellence research Centre for Earth surveillance and space-based monitoring of the environment, the EXCELSIOR Horizon 2020 teaming project

    Science.gov (United States)

    Hadjimitsis, Diofantos G.; Kontoes, Haris; Schreier, Gunter; Ansmann, Albert; Komodromos, George; Themistocleous, Kyriacos; Mamouri, Rodanthi; Michaelides, Silas; Nisantzi, Argyro; Papoutsa, Christiana; Neocleous, Kyriacos; Mettas, Christodoulos; Tzouvaras, Marios; Evagorou, Evagoras; Christofe, Andreas; Melillos, George; Papoutsis, Ioannis

    2017-10-01

    The aim of this paper is to present the strategy and vision to upgrade the existing ERATOSTHENES Research Centre (ERC) established within the Cyprus University of Technology (CUT) into a sustainable, viable and autonomous Centre of Excellence (CoE) for Earth Surveillance and Space-Based Monitoring of the Environment, which will provide the highest quality of related services on the National, European and International levels. EXCELSIOR is a Horizon 2020 Teaming project which addresses a specific challenge defined by the work program, namely, the reduction of substantial disparities in the European Union by supporting research and innovation activities and systems in low performing countries. It also aims at establishing long-term and strategic partnerships between the Teaming partners, thus reducing internal research and innovation disparities within European Research and Innovation landscape. The proposed CoE envisions the upgrading of the existing ERC into an inspiring environment for conducting basic and applied research and innovation in the areas of the integrated use of remote sensing and space-based techniques for monitoring the environment. Environment has been recognized by the Smart Specialization Strategy of Cyprus as the first horizontal priority for future growth of the island. The foreseen upgrade will regard the expansion of this vision to systematic monitoring of the environment using Earth Observation, space and ground based integrated technologies. Such an approach will lead to the systematic monitoring of all three domains of the Environment (Air, Land, Water). Five partners have united to upgrade the existing ERC into a CoE, with the common vision to become a world-class innovation, research and education centre, actively contributing to the European Research Area (ERA). More specifically, the Teaming project is a team effort between the Cyprus University of Technology (CUT, acting as the coordinator), the German Aerospace Centre (DLR), the

  2. Guidance on internal dose assessments from monitoring data (Project IDEAS)

    International Nuclear Information System (INIS)

    Doerfel, H.; Andrasi, A.; Bailey, M.; Berkovski, V.; Castellani, M.; Hurtgen, C.; Jourdain, R.; Le Guen, B.

    2003-01-01

    Several international intercomparison exercises on intake and internal dose assessments from monitoring data led to the conclusion that the results calculated by different participants varied significantly mainly to the broad variety of methods and assumptions applied in the assessment procedure. Based on these experiences the need of harmonisation of the procedures has been formulated as an EU research project under the 5th Framework Programme, with the aim of developing general guidelines for standardising assessments of intakes and internal doses. In the IDEAS project, eight institutions from seven European countries are participating, also using inputs from internal dosimetry professionals from across Europe to ensure broad consensus in the outcome of the project. To ensure that the guidelines are applicable to a wide range of practical situations, the first step will be to compile a database on well documented cases of internal contamination. In parallel, an improved version of existing software will be developed and distributed to the partners for further use. Many cases from the database will be evaluated independently by more partners using the same software and the results will be discussed and the draft guidelines prepared. The guidelines will then be revised and refined on the basis of the experiences and discussions of two workshops, and an inter-comparison exercise organised in the frame of the project which will be open to all internal dosimetry professionals. (author)

  3. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to

  4. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    International Nuclear Information System (INIS)

    Walker, Randy M.; Gross, Ian G.; Smith, Cyrus M.; Hill, David E.

    2011-01-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor

  5. The AAL project: automated monitoring and intelligent analysis for the ATLAS data taking infrastructure

    International Nuclear Information System (INIS)

    Kazarov, A; Miotto, G Lehmann; Magnoni, L

    2012-01-01

    The Trigger and Data Acquisition (TDAQ) system of the ATLAS experiment at CERN is the infrastructure responsible for collecting and transferring ATLAS experimental data from detectors to the mass storage system. It relies on a large, distributed computing environment, including thousands of computing nodes with thousands of application running concurrently. In such a complex environment, information analysis is fundamental for controlling applications behavior, error reporting and operational monitoring. During data taking runs, streams of messages sent by applications via the message reporting system together with data published from applications via information services are the main sources of knowledge about correctness of running operations. The flow of data produced (with an average rate of O(1-10KHz)) is constantly monitored by experts to detect problem or misbehavior. This requires strong competence and experience in understanding and discovering problems and root causes, and often the meaningful information is not in the single message or update, but in the aggregated behavior in a certain time-line. The AAL project is meant at reducing the man power needs and at assuring a constant high quality of problem detection by automating most of the monitoring tasks and providing real-time correlation of data-taking and system metrics. This project combines technologies coming from different disciplines, in particular it leverages on an Event Driven Architecture to unify the flow of data from the ATLAS infrastructure, on a Complex Event Processing (CEP) engine for correlation of events and on a message oriented architecture for components integration. The project is composed of 2 main components: a core processing engine, responsible for correlation of events through expert-defined queries and a web based front-end to present real-time information and interact with the system. All components works in a loose-coupled event based architecture, with a message broker

  6. The AAL project: automated monitoring and intelligent analysis for the ATLAS data taking infrastructure

    Science.gov (United States)

    Kazarov, A.; Lehmann Miotto, G.; Magnoni, L.

    2012-06-01

    The Trigger and Data Acquisition (TDAQ) system of the ATLAS experiment at CERN is the infrastructure responsible for collecting and transferring ATLAS experimental data from detectors to the mass storage system. It relies on a large, distributed computing environment, including thousands of computing nodes with thousands of application running concurrently. In such a complex environment, information analysis is fundamental for controlling applications behavior, error reporting and operational monitoring. During data taking runs, streams of messages sent by applications via the message reporting system together with data published from applications via information services are the main sources of knowledge about correctness of running operations. The flow of data produced (with an average rate of O(1-10KHz)) is constantly monitored by experts to detect problem or misbehavior. This requires strong competence and experience in understanding and discovering problems and root causes, and often the meaningful information is not in the single message or update, but in the aggregated behavior in a certain time-line. The AAL project is meant at reducing the man power needs and at assuring a constant high quality of problem detection by automating most of the monitoring tasks and providing real-time correlation of data-taking and system metrics. This project combines technologies coming from different disciplines, in particular it leverages on an Event Driven Architecture to unify the flow of data from the ATLAS infrastructure, on a Complex Event Processing (CEP) engine for correlation of events and on a message oriented architecture for components integration. The project is composed of 2 main components: a core processing engine, responsible for correlation of events through expert-defined queries and a web based front-end to present real-time information and interact with the system. All components works in a loose-coupled event based architecture, with a message broker

  7. REDD+ readiness: early insights on monitoring, reporting and verification systems of project developers

    International Nuclear Information System (INIS)

    Joseph, Shijo; Sunderlin, William D; Verchot, Louis V; Herold, Martin

    2013-01-01

    A functional measuring, monitoring, reporting and verification (MRV) system is essential to assess the additionality and impact on forest carbon in REDD+ (reducing emissions from deforestation and degradation) projects. This study assesses the MRV capacity and readiness of project developers at 20 REDD+ projects in Brazil, Peru, Cameroon, Tanzania, Indonesia and Vietnam, using a questionnaire survey and field visits. Nineteen performance criteria with 76 indicators were formulated in three categories, and capacity was measured with respect to each category. Of the 20 projects, 11 were found to have very high or high overall MRV capacity and readiness. At the regional level, capacity and readiness tended to be highest in the projects in Brazil and Peru and somewhat lower in Cameroon, Tanzania, Indonesia and Vietnam. Although the MRV capacities of half the projects are high, there are capacity deficiencies in other projects that are a source of concern. These are not only due to limitations in technical expertise, but can also be attributed to the slowness of international REDD+ policy formulation and the unclear path of development of the forest carbon market. Based on the study results, priorities for MRV development and increased investment in readiness are proposed. (letter)

  8. Development and implementation of a software for assessment of calculations in radiotherapy monitor units

    International Nuclear Information System (INIS)

    Mueller, Marcio Rogerio; Silva, Marco Antonio da; Rodrigues, Laura Natal

    2005-01-01

    Objective: To develop and implement a software based on the manual calculation algorithm for verification of the calculations in radiotherapy monitor units and to establish acceptance levels as a mechanism of quality assurance. Materials and methods: Data were obtained from Clinac 600C and 2100C Varian linear accelerators and the computerized treatment planning system used was CadPlan TM . Results: For the 6 MV beams the acceptance levels for deviations among the calculations of monitor units, divided by treatment area, were the following: breast (0.0%±1.7%), head and neck (1.5%±0.5%), hypophysis (-1.7%±0.5%), pelvis (2.1%±2.1%) and thorax (0.2%±1.3%). For the 15 MV beams the suggested level for pelvis in all the treatment techniques was (3.2%±1.3%). Conclusion: The present data are sufficient to justify the use of the software in the clinical practice as a tool for the quality assurance program. (author)

  9. Salamander chytrid fungus (Batrachochytrium salamandrivorans) in the United States—Developing research, monitoring, and management strategies

    Science.gov (United States)

    Grant, Evan H. Campbell; Muths, Erin L.; Katz, Rachel A.; Canessa, Stefano; Adams, Michael J.; Ballard, Jennifer R.; Berger, Lee; Briggs, Cheryl J.; Coleman, Jeremy; Gray, Matthew J.; Harris, M. Camille; Harris, Reid N.; Hossack, Blake R.; Huyvaert, Kathryn P.; Kolby, Jonathan E.; Lips, Karen R.; Lovich, Robert E.; McCallum, Hamish I.; Mendelson, Joseph R.; Nanjappa, Priya; Olson, Deanna H.; Powers, Jenny G.; Richgels, Katherine L. D.; Russell, Robin E.; Schmidt, Benedikt R.; Spitzen-van der Sluijs, Annemarieke; Watry, Mary Kay; Woodhams, Douglas C.; White, C. LeAnn

    2016-01-20

    The recently (2013) identified pathogenic chytrid fungus, Batrachochytrium salamandrivorans (Bsal), poses a severe threat to the distribution and abundance of salamanders within the United States and Europe. Development of a response strategy for the potential, and likely, invasion of Bsal into the United States is crucial to protect global salamander biodiversity. A formal working group, led by Amphibian Research and Monitoring Initiative (ARMI) scientists from the U.S. Geological Survey (USGS) Patuxent Wildlife Research Center, Fort Collins Science Center, and Forest and Rangeland Ecosystem Science Center, was held at the USGS Powell Center for Analysis and Synthesis in Fort Collins, Colorado, United States from June 23 to June 25, 2015, to identify crucial Bsal research and monitoring needs that could inform conservation and management strategies for salamanders in the United States. Key findings of the workshop included the following: (1) the introduction of Bsal into the United States is highly probable, if not inevitable, thus requiring development of immediate short-term and long-term intervention strategies to prevent Bsal establishment and biodiversity decline; (2) management actions targeted towards pathogen containment may be ineffective in reducing the long-term spread of Bsal throughout the United States; and (3) early detection of Bsal through surveillance at key amphibian import locations, among high-risk wild populations, and through analysis of archived samples is necessary for developing management responses. Top research priorities during the preinvasion stage included the following: (1) deployment of qualified diagnostic methods for Bsal and establishment of standardized laboratory practices, (2) assessment of susceptibility for amphibian hosts (including anurans), and (3) development and evaluation of short- and long-term pathogen intervention and management strategies. Several outcomes were achieved during the workshop, including development

  10. Wireless Sensor Network for Electric Transmission Line Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Alphenaar, Bruce

    2009-06-30

    Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications

  11. Improvement of a sensor unit for wrist blood pressure monitoring system

    Science.gov (United States)

    Koo, Sangjun; Kwon, Jongwon; Park, Yongman; Ayuzenara, Odgerel; Kim, Hiesik

    2007-12-01

    A blood pressure sensor unit for ubiquitous healthcare monitoring was newly developed. The digital wrist band-type blood pressure devices for home are popular already in the market. It is useful for checking blood pressure level at home and control of hypertension. Especially, it is very essential home device to check the health condition of blood circulation disease. Nowadays many product types are available. But the measurement of blood pressure is not accurate enough compared with the mechanical type. It needs to be upgraded to assure the precise health data enough to use in the hospital. The structure, feature and output signal of capacitor type pressure sensors are analyzed. An improved design of capacitor sensor is suggested. It shows more precise health data after use on a wrist band type health unit. They can be applied for remote u-health medical service.

  12. Offsite environmental monitoring report. Radiation monitoring around United States nuclear test areas, calendar year 1980

    International Nuclear Information System (INIS)

    Smith, D.D.; Grossman, R.F.; Corkern, W.D.; Thome, D.J.; Patzer, R.G.; Hopper, J.L.

    1981-06-01

    The US Environmental Protection Agency's (EPA) Environmental Monitoring Systems Laboratory in Las Vegas (EMSL-LV) continued its Offsite Radiological Safety Program for the Nevada Test Site (NTS) and other sites of past underground nuclear tests. For each test, the Laboratory provided airborne meteorological measurements, ground and airborne radiation monitoring teams, and special briefings to the Test Controller's Advisory Panel. Test-related radioactivity from the NTS was detected offsite following the Riola Test conducted on September 25, 1980. This consisted of xenon-133 (3.4 x 10 -11 μCi/m1) and xenon-135 (3.6 x 10 -10 μCi/m1) in a compressed air sample collected at Lathrop Wells, Nevada. The estimated dose equivalent to the whole body of a hypothetical receptor at Lathrop Wells from exposure to the radioxenon was 0.011 mrem, which is 0.006 percent of the radiation protection guide for a suitable sample of the general population. Whole-body counts of individuals residing in the environs of the NTS showed no manmade radionuclides attributable to the testing program. The only radioactivity from non-NTS sites of past underground nuclear tests was due to tritium in water samples collected from the Project Dribble Site near Hattiesburg, Mississippi, and the Project Long Shot Site on Amchitka Island, Alaska. The maximum concentrations measured at these locations were 1 and 0.1 percent of the Concentration Guide for drinking water, respectively. A small amount of airborne radioactivity originating from nuclear tests carried out by the People's Republic of China was detected during 1980 at some stations scattered throughout the Air Surveillance Network. The Laboratory's Animal Investigation Program sampled tissues from wildlife and domestic animals on and around the NTS. Data from analysis of these tissues are published separately in an annual report

  13. Projected demographic composition of the United States population of people living with diagnosed HIV.

    Science.gov (United States)

    Hood, Julia E; Golden, Matthew R; Hughes, James P; Goodreau, Steven M; Siddiqi, Azfar-E-Alam; Buskin, Susan E; Hawes, Stephen E

    2017-12-01

    The transformation of HIV from a fatal disease to lifelong disease has resulted in an HIV-infected population that is growing and aging, placing new and increasing demands on public programs and health services. We used National HIV Surveillance System and US census data to project the demographic composition of the population of people living with diagnosed HIV (PLWDH) in the United States through 2045. The input parameters for the projections include: (1) census projections, (2) number of people with an existing HIV diagnosis in 2013, (3) number of new HIV diagnoses in 2013, and (4) death rate within the PLWDH population in 2013. Sex-, risk group-, and race-specific projections were estimated through an adapted Leslie Matrix Model for age-structured populations. Projections for 2013-2045 suggest that the number of PLWDH in the U.S. will consistently grow, from 917,294 to 1,232,054, though the annual growth rate will slow from 1.8% to 0.8%. The number of PLWDH aged 55 years and older will increase from 232,113 to 470,221. The number of non-Hispanic (NH) African Americans/Blacks and Hispanics is projected to consistently grow, shifting the racial/ethnic composition of the US PLWDH population from 32 to 23% NH-White, 42 to 38% NH-Black, and 20-32% Hispanic between 2013 and 2045. Given current trends, the composition of the PLWDH population is projected to change considerably. Public health practitioners should anticipate large shifts in the age and racial/ethnic structure of the PLWDH population in the United States.

  14. DOE Project 353: TAMS Prototype and production coupling alignment units

    Energy Technology Data Exchange (ETDEWEB)

    Field, K.V.

    1996-02-01

    TAMS is an electronic measurement system used to determine the alignment of turbine-generator shafts at the coupling interface. The displacement transducer is a strain gage based sensor mounted in a portable probe. The measurement system was experiencing zero input drift and temperature induced drift. This project endeavored to determine the source of these problems and to revise a unit to be returned to a customer, Baltimore Gas and Electric (BGE), within a period of five weeks.

  15. Outcome mapping as methodology to monitor and evaluate community informatics projects: A case study

    CSIR Research Space (South Africa)

    Herselman, M

    2010-10-01

    Full Text Available The purpose of this paper is to indicate how Outcome Mapping (OM) can be used as a methodology to monitor and evaluate a specific developmental informatics project currently under way in the Meraka Institute. OM was applied in the Broadband for All...

  16. The Navruz Project: Cooperative transboundary monitoring data sharing and modeling of water resources in Central Asia

    International Nuclear Information System (INIS)

    Passell, Howard David; Barber, David S.; Solodukhin, V.; Khazekhber, S.; Pozniak, V.; Vasiliev, I.; Alekhina, V.; Djuraev, Akram; Radyuk, R.; Suozzi, D.

    2006-01-01

    The Navruz Project engages scientists from nuclear physics research institutes and water science institutions in the Central Asia Republics of Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan, and Sandia National Laboratories. The project uses standardized methods to monitor basic water quality parameters, radionuclides, and metals in the Syr Darya and Amu Darya rivers. Phase I of the project was initiated in 2000 with 15 sampling points in each of the four countries with sample analysis performed for over 100 parameters. Phase II of the project began in 2003 and expanded sampling to include at least 30 points in each country in an effort to characterize ''hot spots'' and to identify sources. Phase III of the project began in 2006 and will integrate decision support modeling with the existing monitoring. Overall, the project addresses four main goals: to create collaboration among Central Asian scientists and countries; to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and nonproliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources. Contamination of these rivers is a result of growing population, urbanization, and agricultural activities, as well as radioactive contamination from a legacy of uranium mining and related activities of the former Soviet Union. The project focuses on waterborne radionuclides and metals because of the importance of these contaminants to public health and political stability in Central Asia.

  17. BPA genetic monitoring - BPA Genetic Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Initiated in 1989, this study monitors genetic changes associated with hatchery propagation in multiple Snake River sub-basins for Chinook salmon and steelhead. We...

  18. Adjustment of the Kompleks Titan-2 monitoring computerized system at the Rovno NPP third unit

    International Nuclear Information System (INIS)

    Zigaev, B.P.

    1987-01-01

    Information signal origin and processing processes in the monitoring computerized system 'Komplex Titan-2' at the Rovno NPP third unit are considered. The system exercises control over the following production equipment parameters: the state of keys of control of lock fittings, mechanisms, regulators, reserve mechanism automatic shut-down circuit; the state of lock fittings, mechanisms, regulators, reserve mechanism automated switching on; parameter deviation from permissible values; interlock operation; protection system state; the state of autonomous units and devices

  19. Project realization of jet vortex condenser at units 3 and 3 of the Kozloduy NPP

    International Nuclear Information System (INIS)

    Genovski, I.; Grigorov, A; Bonev, B; Sabinov, S.; Petkov, M.

    2003-01-01

    In the implementation of the contract between the Kozloduy NPP and Department 'Thermal and Nuclear Energy' at the Technical University, Sofia a project has been realized for the demonstration of the modernization of the system for accident localization in the units 3 and 4, based on the jet-vortex condenser (JVC). The final result is multimedia presentation in English and Bulgarian languages. In this paper the last part of the project is presented, including: installing of the JVC, auxiliary systems, executors of the project and expert opinions on the projects

  20. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 110: Area 3 WMD U-3ax/bl Crater, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2006-08-01

    This Post-Closure Inspection and Monitoring Report provides the results and inspections and monitoring for Corrective Action Unit 110: Area 3 Waste Management Division U-3ax/bl Crater, Nevada Test Site, Nevada. This report includes an analysis and summary of the site inpsections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at Corrective Action Unit 110, for the annual period July 2005 thrugh June 2006.

  1. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    Science.gov (United States)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  2. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    Science.gov (United States)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and

  3. Emergency Management and Radiation Moni-toring in Nuclear and Radiological Accidents. Summary Report on the NKS Project EMARAD

    Energy Technology Data Exchange (ETDEWEB)

    Lahtinen, J [Radiation and Nuclear Safety Authority (STUK) (Finland)

    2006-04-15

    In order to manage various nuclear or radiological emergencies the authorities must have pre-prepared plans. The purpose of the NKS project EMARAD (Emergency Management and Radiation Monitoring in Nuclear and Radiological Accidents) was to produce and gather various data and information that could be useful in drawing up emergency plans and radiation monitoring strategies. One of the specific objectives of the project was to establish a www site that would contain various radiation-threat and radiation-monitoring related data and documents and that could be accessed by all Nordic countries. Other important objectives were discussing various factors affecting measurements in an emergency, efficient use of communication technology and disseminating relevant information on such topics as urban dispersion and illicit use of radiation. The web server is hosted by the Radiation and Nuclear Safety Authority (STUK) of Finland. The data stored include pre-calculated consequence data for nuclear power plant accidents as well as documents and presentations describing e.g. general features of monitoring strategies, the testing of the British urban dispersion model UDM and the scenarios and aspects related to malicious use of radiation sources and radioactive material. As regards the last item mentioned, a special workshop dealing with the subject was arranged in Sweden in 2005 within the framework of the project. (au)

  4. Transmission Line Security Monitor: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  5. Development of a reference Phasor Measurement Unit (PMU) for the monitoring and control of grid stability and quality

    Science.gov (United States)

    Ndilimabaka, Hervé; Blanc, Isabelle

    2014-08-01

    This paper discusses the details of the development of a Phasor Measurement Unit regarding the requirements of the IEEE C37.118-2005 synchrophasor standard relative to steady-state conditions on grid monitoring and control. This phasor measurement unit is intended to be used for field tests sooner.

  6. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  7. Miniaturized Power Processing Unit Study: A Cubesat Electric Propulsion Technology Enabler Project

    Science.gov (United States)

    Ghassemieh, Shakib M.

    2014-01-01

    This study evaluates High Voltage Power Processing Unit (PPU) technology and driving requirements necessary to enable the Microfluidic Electric Propulsion technology research and development by NASA and university partners. This study provides an overview of the state of the art PPU technology with recommendations for technology demonstration projects and missions for NASA to pursue.

  8. 40 CFR Table 31 to Subpart Uuu of... - Continuous Monitoring Systems for HAP Emissions From Sulfur Recovery Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Monitoring Systems for HAP Emissions From Sulfur Recovery Units 31 Table 31 to Subpart UUU of Part 63 Protection of Environment..., Subpt. UUU, Table 31 Table 31 to Subpart UUU of Part 63—Continuous Monitoring Systems for HAP Emissions...

  9. Implementation of Trauma-Informed Care and Brief Solution-Focused Therapy: A Quality Improvement Project Aimed at Increasing Engagement on an Inpatient Psychiatric Unit.

    Science.gov (United States)

    Aremu, Babatunde; Hill, Pamela D; McNeal, Joanne M; Petersen, Mary A; Swanberg, Debbie; Delaney, Kathleen R

    2018-03-14

    Addressing tense and escalating situations with noncoercive measures is an important element of inpatient psychiatric treatment. Although restraint rates are frequently monitored, the use of pro re nata (PRN) intramuscular (IM) injections to address agitation is also an important indicator. In 2015, at the current study site, a significant increase was noted in PRN IM medication use despite unit leadership's efforts to build a culture of trauma-informed care (TIC). The purpose of the current quality improvement project was to educate staff on methods to incorporate TIC into daily practice and the use of brief solution-focused therapy techniques in escalating situations. Measurement of attitudes toward patient aggression and engagement with patients followed two waves of staff education. Upon completion of the project, a decrease in PRN IM medications, improvement in staff attitudes toward patient aggression, and improved sense of staff competency in handling tense situations were noted. [Journal of Psychosocial Nursing and Mental Health Services, xx(x), xx-xx.]. Copyright 2018, SLACK Incorporated.

  10. Electromagnetic monitoring of the Earth's interior in the frame of the MEM Project

    Directory of Open Access Journals (Sweden)

    L. Santarelli

    2008-06-01

    Full Text Available The MEM Project (Magnetic and Electric fields Monitoring was activated in the INGV Observatory of L’Aquila since 2004. The principal purpose of the project is to create in Central Italy a network of observatories to monitoring the electromagnetic signals in the frequency band [0.001 Hz - 100 kHz]. This band includes natural signals (magnetic pulsations of magnetospheric origin, Earth-ionosphere resonance mode signals, atmospheric noise, and so on and artificial signals (power line emissions, VLF radio transmissions, and so on. The innovative characteristic of the project is the approach chosen to study the complex problem concerning the representation of the spatial and temporal distributions of the electromagnetic fields in the band of interest. Both the distributions can be represented by some parameters containing the locations and the characteristics of the sources of the electromagnetic signals. When all the stations will be in operation the wide-band interferometry will be applied. Combining the simultaneous observations of the electromagnetic field measured in the stations of the network, we will be able to obtain detailed information about the investigated electromagnetic sources. A new measurement system has been developed to fulfil these requirements focusing on the automation of the measurements. The system is designed for long term recording of the electromagnetic fields in a wide frequency band. In the frequency band [1Hz - 100 kHz] the three components of the magnetic field and the three components of atmospheric electric field are processed in real time using DSP (Digital Signal Processing techniques. In the frequency band [0.001 - 25]Hz the two components of the telluric field and the three components of the magnetic field are recorded as sampled (100Hz. One of the main scientific objectives of the MEM project is the long term monitoring of the geodynamical processes, such as the earthquakes, by the calculation of the Poynting

  11. A Web-Based System for Monitoring and Controlling Multidisciplinary Design Projects

    Science.gov (United States)

    Salas, Andrea O.; Rogers, James L.

    1997-01-01

    In today's competitive environment, both industry and government agencies are under enormous pressure to reduce the time and cost of multidisciplinary design projects. A number of frameworks have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. An examination of current frameworks reveals weaknesses in various areas such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, in conjunction with an existing framework, can improve these areas of weakness. This paper describes a system that executes a sequence of programs, monitors and controls the design process through a Web-based interface, and visualizes intermediate and final results through the use of Java(Tm) applets. A small sample problem, which includes nine processes with two analysis programs that are coupled to an optimizer, is used to demonstrate the feasibility of this approach.

  12. Big Data solution for CTBT monitoring: CEA-IDC joint global cross correlation project

    Science.gov (United States)

    Bobrov, Dmitry; Bell, Randy; Brachet, Nicolas; Gaillard, Pierre; Kitov, Ivan; Rozhkov, Mikhail

    2014-05-01

    Waveform cross-correlation when applied to historical datasets of seismic records provides dramatic improvements in detection, location, and magnitude estimation of natural and manmade seismic events. With correlation techniques, the amplitude threshold of signal detection can be reduced globally by a factor of 2 to 3 relative to currently standard beamforming and STA/LTA detector. The gain in sensitivity corresponds to a body wave magnitude reduction by 0.3 to 0.4 units and doubles the number of events meeting high quality requirements (e.g. detected by three and more seismic stations of the International Monitoring System (IMS). This gain is crucial for seismic monitoring under the Comprehensive Nuclear-Test-Ban Treaty. The International Data Centre (IDC) dataset includes more than 450,000 seismic events, tens of millions of raw detections and continuous seismic data from the primary IMS stations since 2000. This high-quality dataset is a natural candidate for an extensive cross correlation study and the basis of further enhancements in monitoring capabilities. Without this historical dataset recorded by the permanent IMS Seismic Network any improvements would not be feasible. However, due to the mismatch between the volume of data and the performance of the standard Information Technology infrastructure, it becomes impossible to process all the data within tolerable elapsed time. To tackle this problem known as "BigData", the CEA/DASE is part of the French project "DataScale". One objective is to reanalyze 10 years of waveform data from the IMS network with the cross-correlation technique thanks to a dedicated High Performance Computer (HPC) infrastructure operated by the Centre de Calcul Recherche et Technologie (CCRT) at the CEA of Bruyères-le-Châtel. Within 2 years we are planning to enhance detection and phase association algorithms (also using machine learning and automatic classification) and process about 30 terabytes of data provided by the IDC to

  13. Development of a reference Phasor Measurement Unit (PMU for the monitoring and control of grid stability and quality

    Directory of Open Access Journals (Sweden)

    Ndilimabaka Hervé

    2014-01-01

    Full Text Available This paper discusses the details of the development of a Phasor Measurement Unit regarding the requirements of the IEEE C37.118-2005 synchrophasor standard relative to steady-state conditions on grid monitoring and control. This phasor measurement unit is intended to be used for field tests sooner.

  14. Life assessment and emissions monitoring of Indian coal-fired power plants. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    At the request of the Pittsburgh Energy Technology Center (PETC) of the United States Department of Energy (USDOE), the traveler, along with Dr. R. P. Krishnan, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee spent three weeks in India planning and performing emissions monitoring at the coal-fired Vijayawada Thermal Power Station (VTPS). The coordination for the Indian participants was provided by BHEL, Trichy and CPRI, Bangalore. The trip was sponsored by the PETC under the United States Agency for International Development (USAID)/Government of India (GOI)P Alternate Energy Resources Development (AERD) Project. The AERD Project is managed by PETC, and ORNL is providing the technical coordination and support for four coal projects that are being implemented with BHEL, Trichy. The traveler, after briefing the USAID mission in New Delhi visited BHEL, Trichy and CPRI, Bangalore to coordinate and plan the emissions test program. The site selection was made by BHEL, CPRI, TVA, and PETC. Monitoring was performed for 4 days on one of the 4 existing 210 MW coal-fired boilers at the VTPS, 400 km north of Madras, India.

  15. Exxon Valdez Oil Spill Restoration Project final report: Monitoring for evaluation of recovery and restoration of injured nearshore resources

    Science.gov (United States)

    Ballachey, Brenda E.; Bodkin, James L.; Kloecker, Kim; Dean, Tom; Colettie, Heather A

    2015-01-01

    In 2012, we completed three consecutive years of full field sampling in WPWS for EVOS Restoration Project 10100750. Nearshore monitoring was conducted in collaboration with the NPS SWAN I&M program and, beginning in 2012, as part of the EVOSTC GWA program. Data collection was done in accordance with standard operating procedures set forth to monitor marine water chemistry and quality, marine intertidal invertebrates, kelps and seagrasses, marine birds, black oystercatchers, and sea otters. Summer sampling in 2012 represented the fourth year of sampling in WPWS (an initial year of sampling was done in WPWS in 2007; EVOS Restoration Project 070750). Based on our monitoring of nearshore species in WPWS, and comparisons of data from WPWS and other areas within the Gulf of Alaska, we have no evidence of continued injury to biological resources at the spatial scales we are monitoring. A key finding is that recovery of the sea otter population is no longer constrained by exposure to lingering oil; this is consistent with related EVOSTC studies on harlequin ducks (Restoration Project 12120114-Q). We anticipate continued annual nearshore monitoring in WPWS and at KATM and KEFJ under GWA, with data summaries and analyses including all three areas to provide a larger spatial and temporal context to the understanding of processes and patterns in nearshore ecosystems of the GOA which were impacted by the EVOS of 1989.

  16. European collaboration for improved monitoring of Icelandic volcanoes: Status of the FUTUREVOLC project after the initial 18 months

    Science.gov (United States)

    Dumont, Stéphanie; Parks, Michelle; Sigmundsson, Freysteinn; Vogfjörð, Kristín; Einarsdóttir, Heiðveig Maria; Tumi Gudmundsson, Magnús; Kristinsson, Ingvar; Loughlin, Sue; Ilyinskaya, Evgenia; Hooper, Andrew; Kylling, Arve; Witham, Claire; Bean, Chris; Braiden, Aoife; Ripepe, Maurizio; Prata, Fred; Pétur Heiðarsson, Einar; Other Members Of The Futurevolc Team

    2014-05-01

    The FUTUREVOLC project funded by the European Union (FP7) is devoted to volcanic hazard assessment and establishing an integrated volcanological monitoring procedure through a European collaboration. To reach these objectives the project combines broad expertise from 26 partners from 10 countries, focusing on the four most active volcanoes of Iceland: Grímsvötn, Katla, Hekla and Bárdarbunga. The geological setting of Iceland, the high rate of eruptions and the various eruption styles make this country an optimal natural laboratory to study volcanic processes from crustal depths to the atmosphere. The project, which began on 1 October 2012, integrates advanced monitoring and analytical techniques in an innovative way, focusing on (i) detailed monitoring to improve our understanding of the seismic/magmatic unrest, in order to estimate the amount of magma available for an eruption and to provide early warnings (ii) the dynamics of magma in the conduit and a near real time estimation of the mass eruption rate and (iii) observing and modelling the plume dynamics. The project design considers effective collaboration between partners and aims for efficient cross-disciplinary workflows. A major step during the first 18 months of the project was the installation of additional equipment in the volcanic regions of Iceland to reinforce and complement the existing monitoring. The instruments include: seismometers, GPS stations, MultigGAS detectors, DOAS, infrasonic arrays, electric field sensors, radars, and optical particle sizers. Data streaming is designed to withstand extreme weather conditions. The FUTUREVOLC project has an open data policy for real and near-time data. Implementation of a data hub is currently under way, based on open access to data from the 2010 Eyjafjallajökull eruption. Access to volcano monitoring data through a common interface will allow timely information on magma movements facilitated through combined analysis. A key part of the project is to

  17. Assesing the acceptance of the project

    Directory of Open Access Journals (Sweden)

    Clara Fernández-Shaw Toda

    2009-11-01

    Full Text Available OBJECTIVE: Evaluate the acceptability of the project "Adding colour to your unit dose." MATERIAL AND METHODS: It sets in motion a project to reduce errors in the administration of pasting labels with different shapes and colours on blister medicines. It includes the name of the product, the active ingredient, dosage, lot and expiration date. Also included for internal quality control are the initials of the person who made the label and the date and time at which it was made. The nurse monitors the consistency between the data and the label of the drug. After 4 years the external acceptance of the project is analyzed through a satisfaction survey administered to the professionals involved in prescribing and dispensing medicines. RESULTS: 100% of the physicians believed that the project is adequate. Assistants and nurses expressed a dissatisfaction of 58.3% and 26.66% respectively due to the difficulty of extracting the specialty. CONCLUSIONS: - There is agreement on the need to clearly differentiate drugs, which traditional packaging does not resolve while “Adding colour to your unit dose" does. - The pharmacy prepared labels with a flap to facilitate their opening, thereby improving the current system.

  18. Interest in smart metering project surprises utility, IBM

    International Nuclear Information System (INIS)

    Horne, D.

    2006-01-01

    This article provided an outline of Hydro Ottawa and IBM's smart metering pilot project, which has resulted in high approval ratings from the public. The project features 375 participants broken down into 3 separate groups to look for potential consumption differences between customers charged according to standard time-of-use pricing; time-of-use with critical peak pricing; and time-of-use with critical peak rebates. The Ontario Smart Price Pilot project will be run for 5 months, and is expected to provide detailed energy information about usage. Past projects have indicated that customers respond quickly to smart metering, as they are able to monitor their energy usage and more effectively manage their energy consumption. Ontario plans to have all homes and small businesses using smart meters by 2010, as high seasonal demand has indicated that conservation and balanced resource use are now top priorities for many utility companies. At least 10 states in the United States have conducted smart metering pilot projects. The California Public Utilities Commissions has recently approved a $1.7 billion statewide plan to replace old meters with smart meters. In Ontario, customers have ordered 10,000 electricity monitors that Hydro One is giving away. It was concluded that research results from an earlier Hydro One demonstration project with 500 Ontario homeowners showed that real time electricity monitors can help homeowners reduce their consumption of electricity by up to 15 per cent. 4 figs

  19. Utility-Scale Solar 2014. An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-09-01

    Other than the nine Solar Energy Generation Systems (“SEGS”) parabolic trough projects built in the 1980s, virtually no large-scale or “utility-scale” solar projects – defined here to include any groundmounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar thermal power (“CSP”) project larger than 5 MWAC – existed in the United States prior to 2007. By 2012 – just five years later – utility-scale had become the largest sector of the overall PV market in the United States, a distinction that was repeated in both 2013 and 2014 and that is expected to continue for at least the next few years. Over this same short period, CSP also experienced a bit of a renaissance in the United States, with a number of large new parabolic trough and power tower systems – some including thermal storage – achieving commercial operation. With this critical mass of new utility-scale projects now online and in some cases having operated for a number of years (generating not only electricity, but also empirical data that can be mined), the rapidly growing utility-scale sector is ripe for analysis. This report, the third edition in an ongoing annual series, meets this need through in-depth, annually updated, data-driven analysis of not just installed project costs or prices – i.e., the traditional realm of solar economics analyses – but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects in the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are presented where appropriate.

  20. An Improved Calibration Method for Hydrazine Monitors for the United States Air Force

    Energy Technology Data Exchange (ETDEWEB)

    Korsah, K

    2003-07-07

    This report documents the results of Phase 1 of the ''Air Force Hydrazine Detector Characterization and Calibration Project''. A method for calibrating model MDA 7100 hydrazine detectors in the United States Air Force (AF) inventory has been developed. The calibration system consists of a Kintek 491 reference gas generation system, a humidifier/mixer system which combines the dry reference hydrazine gas with humidified diluent or carrier gas to generate the required humidified reference for calibrations, and a gas sampling interface. The Kintek reference gas generation system itself is periodically calibrated using an ORNL-constructed coulometric titration system to verify the hydrazine concentration of the sample atmosphere in the interface module. The Kintek reference gas is then used to calibrate the hydrazine monitors. Thus, coulometric titration is only used to periodically assess the performance of the Kintek reference gas generation system, and is not required for hydrazine monitor calibrations. One advantage of using coulometric titration for verifying the concentration of the reference gas is that it is a primary standard (if used for simple solutions), thereby guaranteeing, in principle, that measurements will be traceable to SI units (i.e., to the mole). The effect of humidity of the reference gas was characterized by using the results of concentrations determined by coulometric titration to develop a humidity correction graph for the Kintek 491 reference gas generation system. Using this calibration method, calibration uncertainty has been reduced by 50% compared to the current method used to calibrate hydrazine monitors in the Air Force inventory and calibration time has also been reduced by more than 20%. Significant findings from studies documented in this report are the following: (1) The Kintek 491 reference gas generation system (generator, humidifier and interface module) can be used to calibrate hydrazine detectors. (2) The

  1. Safeguards and security benefits of project straight-line

    International Nuclear Information System (INIS)

    Jaeger, C.D.; Waddoups, I.G.

    1995-01-01

    As a result of a number of events the inventory of fissile materials no longer in nuclear weapons in the United States is increasing. This has led to a growing concern regarding the potential for theft and/or diversion and accountability of this material. Straight-Line is a project whose purpose is to demonstrate a site-independent system to monitor stored nuclear material (e.g. plutonium) and integrate the collection, processing and dissemination of information regarding this material. Safeguards and security (S ampersand S) goals of this project include data transfer of information on nuclear material to appropriate users to enhance S ampersand S, continuous on-line accountability, reduction of hands-on access to nuclear materials, incorporation of information security technologies, and early detection of tampering or unauthorized material movement. This paper addresses threat considerations, S ampersand S requirements, S ampersand S objectives, and issues for the Straight-Line project. S ampersand S features and benefits of this project are discussed with respect to existing item monitoring systems and/or other material tracking systems being developed

  2. QUALITY ASSURANCE/QUALITY CONTROL OF A PROJECT INVOLVING COOPERATIVE AGREEMENTS, INTRA-AGENCY AGREEMENTS, AGENCY STAFF AND CONTRACTS TO CONDUCT RESEARCH: ECOLOGICAL MONITORING AND ASSESSMENT OF THE GREAT RIVERS ECOSYSTEMS IN THE CENTRAL BASIN OF THE UNITED STATES (EMAP-GRE)

    Science.gov (United States)

    While condition reports are useful to managers, demonstrating how to implement a monitoring and assessment program in the future is also an important project goal. Better monitoring methods will make more information more widely available to better manage the nation's great rive...

  3. RESEARCH AND PRACTICE OF UAV REMOTE SENSING IN THE MONITORING AND MANAGEMENT OF CONSTRUCTION PROJECTS IN RIPARIAN AREAS

    Directory of Open Access Journals (Sweden)

    J. Yu

    2018-04-01

    Full Text Available The objective of this paper is to investigate the use of UAV remote sensing in the monitoring and management of construction projects in riparian areas through the case study of embankment construction projects’ monitoring in the Three Gorges Reservoir area. A three-step approach is proposed to address the problem: data acquisition with UAV, data processing, and monitoring information extraction. The results of the case study demonstrate that UAV remote sensing is capable of providing fast and accurate measurements and calculations for the needs of monitoring of riparian constructions.

  4. Applications of the monitor of loose parts in the cycle 6 of the Laguna Verde Unit 2 power plant

    International Nuclear Information System (INIS)

    Calleros, G.; Mendez, A.; Gomez, R.A.; Castillo, R.; Bravo, J.M.

    2004-01-01

    The monitor of loose parts (Loose Parts Monitoring System) installed in the Unit 2 of the Laguna Verde Central is a tool to detect strange objects or parts loose in the system of refrigeration of the reactor that could be impacted in the walls of the recirculation knots or in the internal of the reactor. In this work two applications are shown carried out with the Monitor of Loose Parts, determining the characteristics of the stable nominal conditions, those which when changing, they are used to diagnose during the Cycle 6 of the Unit 2, failures in the components of the the recirculation circuits or to identify mechanical vibrations of the recirculation knots induced by a flow of recirculation bistable associated to operative conditions of the reactor. (Author)

  5. Successful global assessments and monitoring: The roles of the international community and the United States

    International Nuclear Information System (INIS)

    Lund, H.G.

    1991-01-01

    Successful global assessments and monitoring of natural resources requires teamwork between participating nations and the international communities charged with the responsibility for collecting and disseminating information. In an attempt to identify emerging information needs and to promote coordination, the International Union of Forestry Research Organizations (IUFRO) and other national and international groups held a major conference and workshop in Venice, Italy, on global monitoring last September. The results of the meeting and subsequent events in Montreal indicated a need for more aggressive leadership at the international level and more cooperation at the national level. This paper reports on the outcome of the Venice conference and list some things that the international community and the United States must do to make global assessments and monitoring a reality

  6. Electrical/instrumentation acceptance test report for Project C-018H, 242-A Evaporator/PUREX Plant condensate treatment facility

    International Nuclear Information System (INIS)

    Compau, R.A. Jr.

    1995-01-01

    This project is part of the 200 Area Effluent Treatment Facility. The acceptance test procedure describes test methods for leak detection units, pump flow switches, pump level control valves, room air temperature monitor, leachate pump status contacts, basin pump status contacts, catch basin leak detector, leachate level monitors, and basin level monitors. These are all components of the C-018H Collection System

  7. FINAL TECHNICAL REPORT: Underwater Active Acoustic Monitoring Network For Marine And Hydrokinetic Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Stein, Peter J. [Scientific Solutions, Inc, Nashua, NH (United States); Edson, Patrick L. [Scientific Solutions, Inc, Nashua, NH (United States)

    2013-12-20

    This project saw the completion of the design and development of a second generation, high frequency (90-120 kHz) Subsurface-Threat Detection Sonar Network (SDSN). The system was deployed, operated, and tested in Cobscook Bay, Maine near the site the Ocean Renewable Power Company TidGen™ power unit. This effort resulted in a very successful demonstration of the SDSN detection, tracking, localization, and classification capabilities in a high current, MHK environment as measured by results from the detection and tracking trials in Cobscook Bay. The new high frequency node, designed to operate outside the hearing range of a subset of marine mammals, was shown to detect and track objects of marine mammal-like target strength to ranges of approximately 500 meters. This performance range results in the SDSN system tracking objects for a significant duration - on the order of minutes - even in a tidal flow of 5-7 knots, potentially allowing time for MHK system or operator decision-making if marine mammals are present. Having demonstrated detection and tracking of synthetic targets with target strengths similar to some marine mammals, the primary hurdle to eventual automated monitoring is a dataset of actual marine mammal kinematic behavior and modifying the tracking algorithms and parameters which are currently tuned to human diver kinematics and classification.

  8. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States))

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  9. Impact of the economic downturn on total joint replacement demand in the United States: updated projections to 2021.

    Science.gov (United States)

    Kurtz, Steven M; Ong, Kevin L; Lau, Edmund; Bozic, Kevin J

    2014-04-16

    Few studies have explored the role of the National Health Expenditure and macroeconomics on the utilization of total joint replacement. The economic downturn has raised questions about the sustainability of growth for total joint replacement in the future. Previous projections of total joint replacement demand in the United States were based on data up to 2003 using a statistical methodology that neglected macroeconomic factors, such as the National Health Expenditure. Data from the Nationwide Inpatient Sample (1993 to 2010) were used with United States Census and National Health Expenditure data to quantify historical trends in total joint replacement rates, including the two economic downturns in the 2000s. Primary and revision hip and knee arthroplasty were identified using codes from the International Classification of Diseases, Ninth Revision, Clinical Modification. Projections in total joint replacement were estimated using a regression model incorporating the growth in population and rate of arthroplasties from 1993 to 2010 as a function of age, sex, race, and census region using the National Health Expenditure as the independent variable. The regression model was used in conjunction with government projections of National Health Expenditure from 2011 to 2021 to estimate future arthroplasty rates in subpopulations of the United States and to derive national estimates. The growth trend for the incidence of joint arthroplasty, for the overall United States population as well as for the United States workforce, was insensitive to economic downturns. From 2009 to 2010, the total number of procedures increased by 6.0% for primary total hip arthroplasty, 6.1% for primary total knee arthroplasty, 10.8% for revision total hip arthroplasty, and 13.5% for revision total knee arthroplasty. The National Health Expenditure model projections for primary hip replacement in 2020 were higher than a previously projected model, whereas the current model estimates for total

  10. ''PSAD'' on-line monitoring and aid to diagnosis workstation: a monitoring tool for EDF power plants

    International Nuclear Information System (INIS)

    Morel, J.; Mazalerat, J.M.; Monnier, B.; Cordier, R.

    1993-01-01

    Like other electricity utilities, Electricite de France seeks to enhance the safety and availability of its nuclear power plants. To this end, for over ten years EDF has been installing on each plant unit two monitoring systems of its own design, one to monitor the primary cooling system, and the other, the turbogenerator set. Since the beginning of this project, widespread progress has been made in techniques of signal acquisition and processing, and in diagnosis using artificial intelligence methods. EDF has decided to call on these advanced techniques in developing its new-generation monitoring equipment, and to integrate them in its development of a workstation for on-line monitoring and diagnosis-support (PSAD: Poste de Surveillance et d'Aide au Diagnostic). PSAD will be a tool for on-line monitoring of the main components in nuclear power plants (initially the main coolant pumps and turbogenerator sets, and soon thereafter, monitoring of internal structures, detection of loose parts in the primary cooling system, etc.). PSAD will provide plant personnel with indispensable support in their diagnosis of the condition of plant equipment. It will integrate user-friendly, high-performance systems that also free the operator from many day-to-day tasks. PSAD will have a flexible architecture, for optimum distribution of the computing power where it is most needed, thereby improving the quality of the data. This paper presents the project objectives and describes work currently under way to implement EDF's diagnosis-support strategy for the years to come. (authors). 5 figs., 6 refs

  11. Production-history projections of fuels and some crucial metals in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Arndt, R A; Roper, L D

    1977-09-01

    The production-history projection method of the authors is refined to determine the earliest date at which reasonably well-determined depletion parameters can be ascertained. The method is applied to the United States production data for silver, crude oil, natural gas, coal, iron ore, and uranium ore. 13 references.

  12. Annual Radiological Environmental Monitoring Program Report for the Three Mile Island, Unit 2, Independent Spent Fuel Storage Installation

    International Nuclear Information System (INIS)

    Hall, Gregory Graham

    2002-01-01

    This report presents the results of the 2001 Radiological Environmental Monitoring Program conducted in accordance with 10 CFR 72.44 for the Three Mile Island, Unit 2, Independent Spent Fuel Storage Installation. A description of the facility and the monitoring program is provided. The results of monitoring the two predominant radiation exposure pathways, potential airborne radioactivity releases and direct radiation exposure, indicate the facility operation has not contributed to any increase in the estimated maximum potential dose commitment to the general public.

  13. Yakima/Klickitat Fisheries Project; Klickitat Only Monitoring and Evaluation, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, Melvin; Evenson, Rolf

    2003-12-01

    The monitoring and evaluation activities described in this report were determined by consensus of the scientists from the Yakama Nation (YN). Klickitat Subbasin Monitoring and Evaluation (M&E) activities have been subjected to scientific and technical review by members of YKFP's Science/Technical Advisory Committee (STAC) as part of the YKFP's overall M&E proposal. Yakama Nation YKFP project biologists have transformed the conceptual design into the tasks described. This report summarizes progress and results for the following major categories of YN-managed tasks under this contract: (1) Monitoring and Evaluation - Accurately characterize baseline available habitat and salmonid populations pre-habitat restoration and pre-supplementation. (2) EDT Modeling - Identify and evaluate habitat and artificial production enhancement options. (3) Genetics - Characterize the genetic profile of wild steelhead in the Klickitat Basin. (4) Ecological Interactions - Determine the presence of pathogens in wild and naturally produced salmonids in the Klickitat Basin and develop supplementation strategies using this information.

  14. Salt Repository Project site study plan for seismographic monitoring: Revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    This site study plan describes the seismographic monitoring activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field programs has been designed to provide data useful in addressing information/data needs resulting from Federal/State/local regulatory requirements and repository program requirements. Sixteen new and three relocated seismographic stations will be added to the now existing network of 13 stations for a total of 32 stations in the network. The areal extent is being expanded and selected regions covered more densely to provide more accurate monitoring and location of microearthquakes. More sophisticated instruments are being used at selected locations to allow for more detailed analysis. A few seismographs are being installed at depth to provide a limited 3-D monitoring network in the area of the repository. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technique Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 32 refs., 11 figs., 4 tabs

  15. An ex ante control chart for project monitoring using earned duration management observations

    Science.gov (United States)

    Mortaji, Seyed Taha Hossein; Noori, Siamak; Noorossana, Rassoul; Bagherpour, Morteza

    2017-12-01

    In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project's performance indicators, by plotting them on the Shewhart-type control charts over time. However, these control charts are fundamentally designed for processes and ignore project-specific dynamics, which can lead to weak results and misleading interpretations. By paying close attention to the project baseline schedule and using statistical foundations, this paper proposes a new ex ante control chart which discriminates between acceptable (as-planned) and non-acceptable (not-as-planned) variations of the project's schedule performance. Such control chart enables project managers to set more realistic thresholds leading to a better decision making for taking corrective and/or preventive actions. For the sake of clarity, an illustrative example has been presented to show how the ex ante control chart is constructed in practice. Furthermore, an experimental investigation has been set up to analyze the performance of the proposed control chart. As expected, the results confirm that, when a project starts to deflect significantly from the project's baseline schedule, the ex ante control chart shows a respectable ability to detect and report right signals while avoiding false alarms.

  16. Process monitoring

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    Many of the measurements and observations made in a nuclear processing facility to monitor processes and product quality can also be used to monitor the location and movements of nuclear materials. In this session information is presented on how to use process monitoring data to enhance nuclear material control and accounting (MC and A). It will be seen that SNM losses can generally be detected with greater sensitivity and timeliness and point of loss localized more closely than by conventional MC and A systems if process monitoring data are applied. The purpose of this session is to enable the participants to: (1) identify process unit operations that could improve control units for monitoring SNM losses; (2) choose key measurement points and formulate a loss indicator for each control unit; and (3) describe how the sensitivities and timeliness of loss detection could be determined for each loss indicator

  17. SU-E-T-110: An Investigation On Monitor Unit Threshold and Effects On IMPT Delivery in Proton Pencil Beam Planning System

    International Nuclear Information System (INIS)

    Syh, J; Ding, X; Syh, J; Patel, B; Rosen, L; Wu, H

    2015-01-01

    Purpose: An approved proton pencil beam scanning (PBS) treatment plan might not be able to deliver because of existed extremely low monitor unit per beam spot. A dual hybrid plan with higher efficiency of higher spot monitor unit and the efficacy of less number of energy layers were searched and optimized. The range of monitor unit threshold setting was investigated and the plan quality was evaluated by target dose conformity. Methods: Certain limitations and requirements need to be checks and tested before a nominal proton PBS treatment plan can be delivered. The plan needs to be met the machine characterization, specification in record and verification to deliver the beams. Minimal threshold of monitor unit, e.g. 0.02, per spot was set to filter the low counts and plan was re-computed. Further MU threshold increment was tested in sequence without sacrificing the plan quality. The number of energy layer was also alternated due to elimination of low count layer(s). Results: Minimal MU/spot threshold, spot spacing in each energy layer and total number of energy layer and the MU weighting of beam spots of each beam were evaluated. Plan optimization between increases of the spot MU (efficiency) and less energy layers of delivery (efficacy) was adjusted. 5% weighting limit of total monitor unit per beam was feasible. Scarce spreading of beam spots was not discouraging as long as target dose conformity within 3% criteria. Conclusion: Each spot size is equivalent to the relative dose in the beam delivery system. The energy layer is associated with the depth of the targeting tumor. Our work is crucial to maintain the best possible quality plan. To keep integrity of all intrinsic elements such as spot size, spot number, layer number and the carried weighting of spots in each layer is important in this study

  18. The Space Weather Monitor Project: Bringing Hands-on Science to Students of the Developing World for the IHY2007

    Science.gov (United States)

    Scherrer, D. K.; Rabello-Soares, M. C.; Morrow, C.

    2006-08-01

    Stanford's Solar Center, Electrical Engineering Department, and local educators have developed inexpensive Space Weather Monitors that students around the world can use to track solar-induced changes to the Earth's ionosphere. Through the United Nations Basic Space Science Initiative (UNBSSI) and the IHY Education and Public Outreach Program, our Monitors are being deployed to 191 countries for the International Heliophysical Year, 2007. In partnership with Chabot Space and Science Center, we are designing and developing classroom and educator support materials to accompany the distribution. Materials will be culturally sensitive and will be translated into the six official languages of the United Nations (Arabic, Chinese, English, French, Russian, and Spanish). Monitors will be provided free of charge to developing nations and can be set up anywhere there is access to power.

  19. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  20. Visualizing Earth Science Data for Environmental Monitoring and Decision Support in Mesoamerica: The SERVIR Project

    Science.gov (United States)

    Hardin, D.; Graves, S.; Sever, T.; Irwin, D.

    2005-05-01

    In 2002 and 2003 NASA, the World Bank and the United States Agency for International Development (USAID) joined with the Central American Commission for Environment and Development (CCAD) to develop an advanced decision support system for Mesoamerica (named SERVIR). Mesoamerica - composed of the seven Central American countries and the five southernmost states of Mexico - makes up only a small fraction of the world's land surface. However, the region is home to approximately eight percent of the planet's biodiversity (14 biosphere reserves, 31 Ramsar sites, 8 world heritage sites, 589 protected areas) and 45 million people including more than 50 different ethnic groups. Mesoamerica's biological and cultural diversity are severely threatened by human impact and natural disasters including extensive deforestation, illegal logging, water pollution, slash and burn agriculture, earthquakes, hurricanes, drought, and volcanic eruption. NASA Marshall Space Flight Center (NASA/MSFC), together with the University of Alabama in Huntsville (UAH) and the SERVIR partners are developing state-of-the-art decision support tools for environmental monitoring as well as disaster prevention and mitigation in Mesoamerica. These partners are contributing expertise in space-based observation with information management technologies and intimate knowledge of local ecosystems to create a system that is being used by scientists, educators, and policy makers to monitor and forecast ecological changes, respond to natural disasters, and better understand both natural and human induced effects. The decision support and environmental monitoring data products are typically formatted as conventional two-dimensional, static and animated imagery. However, in addition to conventional data products and as a major portion of our research, we are employing commercial applications that generate three-dimensional interactive visualizations that allow data products to be viewed from multiple angles and at

  1. The projectable hull of an archimedean $ell$-group with weak unit

    Directory of Open Access Journals (Sweden)

    Anthony W. Hager

    2017-07-01

    Full Text Available The much-studied projectable hull of an $ell$-group $Gleq pG$ is an essential extension, so that, in the case that $G$ is  archimedean with weak unit, ``$Gin {bf W}$", we have for the Yosida representation spaces a ``covering map" $YG leftarrow YpG$. We have earlier cite{hkm2} shown that (1 this cover has a characteristic minimality property, and that (2 knowing $YpG$, one can write down $pG$. We now show directly that for $mathscr{A}$, the boolean algebra in the power set of the minimal prime spectrum $Min(G$, generated by the sets $U(g={Pin Min(G:gnotin P}$ ($gin G$, the Stone space $mathcal{A}mathscr{A}$ is a cover of $YG$ with the minimal property of (1; this extends the result from cite{bmmp} for the strong unit case. Then, applying (2 gives the pre-existing description of $pG$, which includes the strong unit description of cite{bmmp}. The present methods are largely topological, involving details of covering maps and Stone duality.

  2. Monitoring pilot projects on bored tunnelling : The Second Heinenoord Tunnel and the Botlek Rail Tunnel

    NARCIS (Netherlands)

    Bakker, K.J.; De Boer, F.; Admiraal, J.B.M.; Van Jaarsveld, E.P.

    1999-01-01

    Two pilot projects for bored tunnelling in soft soil have been undertaken in the Netherlands. The monitoring was commissioned under the authority of the Centre for Underground Construction (COB). A description of the research related to the Second Heinenoord Tunnel and the Botlek Rail Tunnel will be

  3. Application of an automated patrol-type monitoring system in the reinforced concrete containment vessel at Kashiwazaki-Kariwa Nuclear Power Plant Units 6 and 7

    International Nuclear Information System (INIS)

    Kimoto, T.; Senoh, M.; Hirakawa, H.; Tanaka, K.; Takahashi, M.

    1996-01-01

    An automated patrol-type monitoring system was applied to the first Advanced Boiling Water Reactor (ABWR) plants in the world, Kashiwazaki-Kariwa Nuclear Power Plant Units 6 and 7. The system consists of two robots traveling along monorail and several ITV systems. This monitoring system is used to watch the operating incident of key components of ABWR, such as water leakage from packing in Fine Motion Control Rod Drive (FM-CRD), Reactor Internal Pump (RIP) etc. which are located in the reinforced concrete containment and usually could not be accessible under operation. The traveling robots are equipped with the three kinds of sensors, an infrared camera, a color TV camera and a microphone, and have a capability to inspect the pre-determined inspection points guided by the monorail. This monitoring system is automatically turned on to start inspection at a scheduled time. For Units 6 and 7, this monitoring system, two robots and several ITV systems, can be controlled from one common control desk and one handy-type remote control panel. Since this monitoring system was installed at Kashiwazaki-Kariwa Nuclear Power Plant Units 6 and 7, this system has been operating successfully. (The installation and testing of the system for Unit 6 was finished completely and the testing the system for Unit 7 has been carrying out.) (author)

  4. Monitoring: The missing piece

    Energy Technology Data Exchange (ETDEWEB)

    Bjorkland, Ronald, E-mail: r_bjorkland@hotmail.com

    2013-11-15

    The U.S. National Environmental Policy Act (NEPA) of 1969 heralded in an era of more robust attention to environmental impacts resulting from larger scale federal projects. The number of other countries that have adopted NEPA's framework is evidence of the appeal of this type of environmental legislation. Mandates to review environmental impacts, identify alternatives, and provide mitigation plans before commencement of the project are at the heart of NEPA. Such project reviews have resulted in the development of a vast number of reports and large volumes of project-specific data that potentially can be used to better understand the components and processes of the natural environment and provide guidance for improved and efficient environmental protection. However, the environmental assessment (EA) or the more robust and intensive environmental impact statement (EIS) that are required for most major projects more frequently than not are developed to satisfy the procedural aspects of the NEPA legislation while they fail to provide the needed guidance for improved decision-making. While NEPA legislation recommends monitoring of project activities, this activity is not mandated, and in those situations where it has been incorporated, the monitoring showed that the EIS was inaccurate in direction and/or magnitude of the impact. Many reviews of NEPA have suggested that monitoring all project phases, from the design through the decommissioning, should be incorporated. Information gathered though a well-developed monitoring program can be managed in databases and benefit not only the specific project but would provide guidance how to better design and implement future activities designed to protect and enhance the natural environment. -- Highlights: • NEPA statutes created profound environmental protection legislative framework. • Contrary to intent, NEPA does not provide for definitive project monitoring. • Robust project monitoring is essential for enhanced

  5. A program for monitor unit calculation for high energy photon beams in isocentric condition based on measured data

    International Nuclear Information System (INIS)

    Gesheva-Atanasova, N.

    2008-01-01

    The aim of this study is: 1) to propose a procedure and a program for monitor unit calculation for radiation therapy with high energy photon beams, based on data measured by author; 2) to compare this data with published one and 3) to evaluate the precision of the monitor unit calculation program. From this study it could be concluded that, we reproduced with a good agreement the published data, except the TPR values for dept up to 5 cm. The measured relative weight of upper and lower jaws - parameter A was dramatically different from the published data, but perfectly described the collimator exchange effect for our treatment machine. No difference was found between the head scatter ratios, measured in a mini phantom and those measured with a proper brass buildup cap. Our monitor unit calculation program was found to be reliable and it can be applied for check up of the patient's plans for irradiation with high energy photon beams and for some fast calculations. Because of the identity in the construction, design and characteristics of the Siemens accelerators, and the agreement with the published data for the same beam qualities, we hope that most of our experimental data and this program can be used after verification in other hospitals

  6. Small-scale response in an avian community to a large-scale thinning project in the southwestern United States

    Science.gov (United States)

    Karen E. Bagne; Deborah M. Finch

    2009-01-01

    Avian populations were monitored using point counts from 2002 to 2007, two years before and four years after a 2800 ha fuel reduction project. The study area was within a ponderosa pine forest near Santa Fe, New Mexico, USA. Adjacent unthinned areas were also monitored as a reference for population variation related to other factors. For individual bird species...

  7. United States Support Programme (USSP): Lessons Learned from the Management of Complex, Multi-Stakeholder Projects for International Safeguards

    International Nuclear Information System (INIS)

    Diaz, R.; Tackentien, J.

    2015-01-01

    This paper will review USSP experiences, lessons learned, and proposed future strategies on the management of complex projects including the Universal Non-Destructive Assay Data Acquisition Platform (UNAP) instrument development task. The focus will be on identifying lessons learned to formulate strategies to minimize risk and maximize the potential of commercial success for future complex projects. Topics planned for inclusion are: 1. Initial agreement amongst all stakeholders on the justification of the need of the development including market studies of existing/near term future COTS technology capabilities; 2. Initial confirmation that there is a market for the product other than the IAEA to reduce investment risk; 3. Agreement on an accelerated initial project schedule from request acceptance to commercial unit production including per unit cost and quantities; 4. During product development, obtaining periodic customer reaffirmation of the need and quantities for the product per the existing schedule and per unit price. (author)

  8. Groundwater-quality data in the northern Coast Ranges study unit, 2009: Results from the California GAMA Program

    Science.gov (United States)

    Mathany, Timothy M.; Dawson, Barbara J.; Shelton, Jennifer L.; Belitz, Kenneth

    2011-01-01

    Groundwater quality in the 633-square-mile Northern Coast Ranges (NOCO) study unit was investigated by the U.S. Geological Survey (USGS) from June to November 2009, as part of the California State Water Resources Control Board (SWRCB) Groundwater Ambient Monitoring and Assessment (GAMA) Program's Priority Basin Project (PBP) and the U.S. Geological Survey National Water-Quality Assessment Program (NAWQA). The GAMA-PBP was developed in response to the California Groundwater Quality Monitoring Act of 2001 and is being conducted in collaboration with the SWRCB and Lawrence Livermore National Laboratory (LLNL). The NOCO study unit was the thirtieth study unit to be sampled as part of the GAMA-PBP.

  9. Workforce Projections 2010-2020: Annual Supply and Demand Forecasting Models for Physical Therapists Across the United States.

    Science.gov (United States)

    Landry, Michel D; Hack, Laurita M; Coulson, Elizabeth; Freburger, Janet; Johnson, Michael P; Katz, Richard; Kerwin, Joanne; Smith, Megan H; Wessman, Henry C Bud; Venskus, Diana G; Sinnott, Patricia L; Goldstein, Marc

    2016-01-01

    Health human resources continue to emerge as a critical health policy issue across the United States. The purpose of this study was to develop a strategy for modeling future workforce projections to serve as a basis for analyzing annual supply of and demand for physical therapists across the United States into 2020. A traditional stock-and-flow methodology or model was developed and populated with publicly available data to produce estimates of supply and demand for physical therapists by 2020. Supply was determined by adding the estimated number of physical therapists and the approximation of new graduates to the number of physical therapists who immigrated, minus US graduates who never passed the licensure examination, and an estimated attrition rate in any given year. Demand was determined by using projected US population with health care insurance multiplied by a demand ratio in any given year. The difference between projected supply and demand represented a shortage or surplus of physical therapists. Three separate projection models were developed based on best available data in the years 2011, 2012, and 2013, respectively. Based on these projections, demand for physical therapists in the United States outstrips supply under most assumptions. Workforce projection methodology research is based on assumptions using imperfect data; therefore, the results must be interpreted in terms of overall trends rather than as precise actuarial data-generated absolute numbers from specified forecasting. Outcomes of this projection study provide a foundation for discussion and debate regarding the most effective and efficient ways to influence supply-side variables so as to position physical therapists to meet current and future population demand. Attrition rates or permanent exits out of the profession can have important supply-side effects and appear to have an effect on predicting future shortage or surplus of physical therapists. © 2016 American Physical Therapy

  10. Using the FORE-SCE model to project land-cover change in the southeastern United States

    Science.gov (United States)

    Sohl, Terry; Sayler, Kristi L.

    2008-01-01

    A wide variety of ecological applications require spatially explicit current and projected land-use and land-cover data. The southeastern United States has experienced massive land-use change since European settlement and continues to experience extremely high rates of forest cutting, significant urban development, and changes in agricultural land use. Forest-cover patterns and structure are projected to change dramatically in the southeastern United States in the next 50 years due to population growth and demand for wood products [Wear, D.N., Greis, J.G. (Eds.), 2002. Southern Forest Resource Assessment. General Technical Report SRS-53. U.S. Department of Agriculture, Forest Service, Southern Research Station, Asheville, NC, 635 pp]. Along with our climate partners, we are examining the potential effects of southeastern U.S. land-cover change on regional climate. The U.S. Geological Survey (USGS) Land Cover Trends project is analyzing contemporary (1973-2000) land-cover change in the conterminous United States, providing ecoregion-by-ecoregion estimates of the rates of change, descriptive transition matrices, and changes in landscape metrics. The FORecasting SCEnarios of future land-cover (FORE-SCE) model used Land Cover Trends data and theoretical, statistical, and deterministic modeling techniques to project future land-cover change through 2050 for the southeastern United States. Prescriptions for future proportions of land cover for this application were provided by ecoregion-based extrapolations of historical change. Logistic regression was used to develop relationships between suspected drivers of land-cover change and land cover, resulting in the development of probability-of-occurrence surfaces for each unique land-cover type. Forest stand age was initially established with Forest Inventory and Analysis (FIA) data and tracked through model iterations. The spatial allocation procedure placed patches of new land cover on the landscape until the scenario

  11. The Detector Control Unit An ASIC for the monitoring of the CMS silicon tracker

    CERN Document Server

    Magazzù, G; Moreira, P

    2004-01-01

    The Detector Control Unit (DCU) is an ASIC developed as the central building block of a monitoring system for the CMS Tracker. Leakage currents in the Silicon detectors, power supply voltages of the readout electronics and local temperatures will be monitored in order to guarantee safe operating conditions during the 10-years lifetime in the LHC environment. All these measurements can be performed by an A/D converter preceded by an analog multiplexer and properly interfaced to the central control system. The requirements in terms of radiation tolerance, low-power dissipation and integration with the rest of the system led to the design of a custom integrated circuit. Its structure and characteristics are described in this paper. (6 refs).

  12. On the monitoring and prediction of flash floods in small and medium-sized catchments - the EXTRUSO project

    Science.gov (United States)

    Wiemann, Stefan; Eltner, Anette; Sardemann, Hannes; Spieler, Diana; Singer, Thomas; Thanh Luong, Thi; Janabi, Firas Al; Schütze, Niels; Bernard, Lars; Bernhofer, Christian; Maas, Hans-Gerd

    2017-04-01

    Flash floods regularly cause severe socio-economic damage worldwide. In parallel, climate change is very likely to increase the number of such events, due to an increasing frequency of extreme precipitation events (EASAC 2013). Whereas recent work primarily addresses the resilience of large catchment areas, the major impact of hydro-meteorological extremes caused by heavy precipitation is on small areas. Those are very difficult to observe and predict, due to sparse monitoring networks and only few means for hydro-meteorological modelling, especially in small catchment areas. The objective of the EXTRUSO project is to identify and implement appropriate means to close this gap by an interdisciplinary approach, combining comprehensive research expertise from meteorology, hydrology, photogrammetry and geoinformatics. The project targets innovative techniques for achieving spatio-temporal densified monitoring and simulations for the analysis, prediction and warning of local hydro-meteorological extreme events. The following four aspects are of particular interest: 1. The monitoring, analysis and combination of relevant hydro-meteorological parameters from various sources, including existing monitoring networks, ground radar, specific low-cost sensors and crowdsourcing. 2. The determination of relevant hydro-morphological parameters from different photogrammetric sensors (e.g. camera, laser scanner) and sensor platforms (e.g. UAV (unmanned aerial vehicle) and UWV (unmanned water vehicle)). 3. The continuous hydro-meteorological modelling of precipitation, soil moisture and water flows by means of conceptual and data-driven modelling. 4. The development of a collaborative, web-based service infrastructure as an information and communication point, especially in the case of an extreme event. There are three major applications for the planned information system: First, the warning of local extreme events for the population in potentially affected areas, second, the support

  13. Pre-service proof pressure and leak rate tests for the Qinshan CANDU project reactor buildings

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The Qinshan CANDU Project Reactor Buildings (Units 1 and 2) have been successfully tested for the Pre-Service Proof Pressure and Integrated Leak Rate Tests. The Unit 1 tests took place from May 3 to May 9, 2002 and from May 22 to May 25, 2002, and the Unit 2 tests took place from January 21 to January 27, 2003. This paper discusses the significant steps taken at minimum cost on the Qinshan CANDU Project, which has resulted in a) very good leak rate (0.21%) for Unit 1 and excellent leak rate (0.130%) for Unit 2; b) continuous monitoring of the structural behaviour during the Proof Pressure Test, thus eliminating any repeat of the structural test due to lack of data; and c) significant schedule reduction achieved for these tests in Unit 2. (author)

  14. Utility-Scale Solar 2013: An empirical analysis of project cost, performance, and pricing trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Weaver, Samantha [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-09-17

    Other than the SEGS I-IX parabolic trough projects built in the 1980s, virtually no large-scale or "utility-scale" solar projects-defined here to include any ground-mounted photovoltaic ("PV"), concentrating photovoltaic ("CPV"), or concentrating solar power ("CSP" or solar thermal) project larger than 5 MWAC-existed in the United States prior to 2007.

  15. Enhancement of hand hygiene compliance among health care workers from a hemodialysis unit using video-monitoring feedback.

    Science.gov (United States)

    Sánchez-Carrillo, Laura Arelí; Rodríguez-López, Juan Manuel; Galarza-Delgado, Dionisio Ángel; Baena-Trejo, Laura; Padilla-Orozco, Magaly; Mendoza-Flores, Lidia; Camacho-Ortiz, Adrián

    2016-08-01

    The importance of hand hygiene in the prevention of health care-associated infection is well known. Experience with hand hygiene compliance (HHC) evaluation in hemodialysis units is scarce. This study was a 3-phase, prospective longitudinal intervention study during a 5-month period in a 13-bed hemodialysis unit at a university hospital in Northern Mexico. The unit performs an average of 1,150 hemodialysis procedures per month. Compliance was evaluated by a direct observer and a video assisted observer. Feedback was given to health care workers in the form of educational sessions and confidential reports and video analysis of compliance and noncompliance. A total of 5,402 hand hygiene opportunities were registered; 5,201 during 7,820 minutes of video footage and 201 by direct observation during 1,180 minutes. Lower compliance during the baseline evaluation was observed by video monitoring compared with direct observation (P hand hygiene compliance. Video-assisted monitoring of hand hygiene is an excellent method for the evaluation of HHC in a hemodialysis unit; enhanced HHC can be achieved through a feedback program to the hemodialysis staff that includes video examples and confidential reports. Copyright © 2016 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  16. Monitoring nuclear reactors with anti-neutrino detectors: the ANGRA project

    Energy Technology Data Exchange (ETDEWEB)

    Chimenti, Pietro; Leigui, Marcelo Augusto [UFABC - Universidade Federal do ABC. Rua Santa Adelia, 166. Bairro Bangu. Santo Andre - SP (Brazil); Anjos, Joao; Azzi, Gabriel; Rafael, Gama; Ademarlaudo, Barbosa; Lima, Herman; VAZ, Mario; Villar, Arthur [Centro Brasileiro de Pesquisas Fisicas - CBPF, Rua Dr. Xavier Sigaud, 150, Urca, Rio de Janeiro, RJ - 22290-180 (Brazil); Gonzales, Luis Fernando; Bezerra, Thiago; Kemp, Ernesto [Unicamp, State University of Campinas, Cidade Universitaria ' Zeferino Vaz' , Barao Geraldo - Campinas, Sao Paulo (Brazil); Nunokawa, Hiroshi [Department of Physics, Pontifical Catholic University - PUC, Rua Marques de Sao Vicente, 225, 22451-900 Gavea - Rio de Janeiro - RJ (Brazil); Guedes, Germano; Faria, Paulo Cesar [Universidade Estadual de Feira de Santana - UEFS, Avenida Transnordestina, Novo Horizonte (Brazil); Pepe, Iuri [Universidade Federal da Bahia - UFBA (Brazil)

    2010-07-01

    We describe the status of the ANGRA Project, aimed at developing an anti-neutrino detector for monitoring nuclear reactors. Indeed the detection of anti-neutrinos provides a unique handle for non-invasive measurements of the nuclear fuel. This kind of measurements are of deep interest for developing new safeguards tools which may help in nuclear non-proliferation programs. The ANGRA experiment, placed at about 30 m from the core of the 4 GW Brazilian nuclear power reactor ANGRA II, is based on a water Cherenkov detector with about one ton target mass. A few thousand antineutrino interactions per day are expected. The latest results from simulations and the status of the construction are presented. (authors)

  17. Contamination monitoring activities in Kanupp

    Energy Technology Data Exchange (ETDEWEB)

    Naqvi, S S [Karachi Nuclear Power Plant (Pakistan)

    1997-06-01

    The Karachi Nuclear Power Plant (Kanupp) is a 137 MWe pressurized heavy water reactor, designed and erected by the Canadian General Electric Company as a turn key project. The plant is in operation since it was commissioned in the year 1972. It is located at the Arabian Sea Coast about 15 miles to the west of Karachi. During its more than two decades of operation, the plant has generated about 8 billion units of electricity with an average life time availability factor of 60%. In Kanupp, radioactive contamination may exit due to the release of fission product, activation products etc., which may somehow escape from its confinement and may contaminate surface or other media such as air, water etc. In this paper, following items are described: main aspects of contamination, status of contamination monitoring, need of contamination monitoring, radiation protection activity, instruments, contamination, current status of contamination survey materials and their disposal, and environmental monitoring. (G.K.)

  18. Regional monitoring programs in the United States: Synthesis of four case studies from Pacific, Atlantic, and Gulf Coasts

    Science.gov (United States)

    Tango, Peter J.; Schiff, K.; Trowbridge, P.R.; Sherwood, E.T.; Batiuk, R.A.

    2016-01-01

    Water quality monitoring is a cornerstone of environmental protection and ambient monitoring provides managers with the critical data they need to take informed action. Unlike site-specific monitoring that is at the heart of regulatory permit compliance, regional monitoring can provide an integrated, holistic view of the environment, allowing managers to obtain a more complete picture of natural variability and cumulative impacts, and more effectively prioritize management actions. By reviewing four long-standing regional monitoring programs that cover portions of all three coasts in the United States – Chesapeake Bay, Tampa Bay, Southern California Bight, and San Francisco Bay – important insights can be gleaned about the benefits that regional monitoring provides to managers. These insights include the underlying reasons that make regional monitoring programs successful, the challenges to maintain relevance and viability in the face of ever-changing technology, competing demands and shifting management priorities. The lessons learned can help other managers achieve similar successes as they seek to establish and reinvigorate their own monitoring programs.

  19. 40 CFR Table 17 to Subpart Uuu of... - Continuous Monitoring Systems for Organic HAP Emissions From Catalytic Reforming Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Monitoring Systems for Organic HAP Emissions From Catalytic Reforming Units 17 Table 17 to Subpart UUU of Part 63 Protection of... Organic HAP Emissions From Catalytic Reforming Units As stated in § 63.1566(b)(1), you shall meet each...

  20. 40 CFR Table 10 to Subpart Uuu of... - Continuous Monitoring Systems for Organic HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Monitoring Systems for Organic HAP Emissions From Catalytic Cracking Units 10 Table 10 to Subpart UUU of Part 63 Protection of... Organic HAP Emissions From Catalytic Cracking Units As stated in § 63.1565(b)(1), you shall meet each...

  1. SHynergie: Development of a virtual project laboratory for monitoring hydraulic stimulations

    Science.gov (United States)

    Renner, Jörg; Friederich, Wolfgang; Meschke, Günther; Müller, Thomas; Steeb, Holger

    2016-04-01

    Hydraulic stimulations are the primary means of developing subsurface reservoirs regarding the extent of fluid transport in them. The associated creation or conditioning of a system of hydraulic conduits involves a range of hydraulic and mechanical processes but also chemical reactions, such as dissolution and precipitation, may affect the stimulation result on time scales as short as hours. In the light of the extent and complexity of these processes, the steering potential for the operator of a stimulation critically depends on the ability to integrate the maximum amount of site-specific information with profound process understanding and a large spectrum of experience. We report on the development of a virtual project laboratory for monitoring hydraulic stimulations within the project SHynergie (http://www.ruhr-uni-bochum.de/shynergie/). The concept of the laboratory envisioned product that constitutes a preparing and accompanying rather than post-processing instrument ultimately accessible to persons responsible for a project over a web-repository. The virtual laboratory consists of a data base, a toolbox, and a model-building environment. Entries in the data base are of two categories. On the one hand, selected mineral and rock properties are provided from the literature. On the other hand, project-specific entries of any format can be made that are assigned attributes regarding their use in a stimulation problem at hand. The toolbox is interactive and allows the user to perform calculations of effective properties and simulations of different types (e.g., wave propagation in a reservoir, hydraulic test). The model component is also hybrid. The laboratory provides a library of models reflecting a range of scenarios but also allows the user to develop a site-specific model constituting the basis for simulations. The laboratory offers the option to use its components following the typical workflow of a stimulation project. The toolbox incorporates simulation

  2. SU-F-T-67: Correction Factors for Monitor Unit Verification of Clinical Electron Beams

    Energy Technology Data Exchange (ETDEWEB)

    Haywood, J [Mercy Health Partners, Muskegon, MI (United States)

    2016-06-15

    Purpose: Monitor units calculated by electron Monte Carlo treatment planning systems are often higher than TG-71 hand calculations for a majority of patients. Here I’ve calculated tables of geometry and heterogeneity correction factors for correcting electron hand calculations. Method: A flat water phantom with spherical volumes having radii ranging from 3 to 15 cm was created. The spheres were centered with respect to the flat water phantom, and all shapes shared a surface at 100 cm SSD. D{sub max} dose at 100 cm SSD was calculated for each cone and energy on the flat phantom and for the spherical volumes in the absence of the flat phantom. The ratio of dose in the sphere to dose in the flat phantom defined the geometrical correction factor. The heterogeneity factors were then calculated from the unrestricted collisional stopping power for tissues encountered in electron beam treatments. These factors were then used in patient second check calculations. Patient curvature was estimated by the largest sphere that aligns to the patient contour, and appropriate tissue density was read from the physical properties provided by the CT. The resulting MU were compared to those calculated by the treatment planning system and TG-71 hand calculations. Results: The geometry and heterogeneity correction factors range from ∼(0.8–1.0) and ∼(0.9–1.01) respectively for the energies and cones presented. Percent differences for TG-71 hand calculations drop from ∼(3–14)% to ∼(0–2)%. Conclusion: Monitor units calculated with the correction factors typically decrease the percent difference to under actionable levels, < 5%. While these correction factors work for a majority of patients, there are some patient anatomies that do not fit the assumptions made. Using these factors in hand calculations is a first step in bringing the verification monitor units into agreement with the treatment planning system MU.

  3. Futures project anticipates changes and challenges facing forests of the northern United States

    Science.gov (United States)

    Stephen R. Shifley; W. Keith Moser; Michael E. Goerndt; Nianfu Song; Mark D. Nelson; David J. Nowak; Patrick D. Miles; Brett J. Butler; Ryan D. DeSantis; Francisco X. Aguilar; Brian G. Tavernia

    2014-01-01

    The Northern Forest Futures Project aims to reveal how today's trends and choices are likely to change the future forest landscape in the northeastern and midwestern United States. The research is focused on the 20-state quadrant bounded by Maine, Maryland, Missouri, and Minnesota. This area, which encompasses most of the Central Hardwood Forest region, is the...

  4. Projecting changes in regional temperature and precipitation extremes in the United States

    OpenAIRE

    Justin T. Schoof; Scott M. Robeson

    2016-01-01

    Regional and local climate extremes, and their impacts, result from the multifaceted interplay between large-scale climate forcing, local environmental factors (physiography), and societal vulnerability. In this paper, we review historical and projected changes in temperature and precipitation extremes in the United States, with a focus on strengths and weaknesses of (1) commonly used definitions for extremes such as thresholds and percentiles, (2) statistical approaches to quantifying change...

  5. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    International Nuclear Information System (INIS)

    Peelle, E.; Schweitzer, M.; Scharre, P.; Pressman, B.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possible through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability

  6. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Peelle, E.; Schweitzer, M.; Scharre, P.; Pressman, B.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possible through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.

  7. Pre operational background radiation monitoring around Kudankulam Nuclear Power Project site - a decade long experience

    International Nuclear Information System (INIS)

    Vijayakumar, B.; George, Thomas; Sundara Rajan, P.; Selvi, B.S.; Balamurugan, M.; Pandit, G.G.; Ravi, P.M.; Tripathi, R.M.

    2014-01-01

    Pre-operational environmental background radiation monitoring around nuclear power plants is very important to understand baseline values existing in the site and also to identify any hot spots of naturally occurring high background radiation areas and their sources. These baseline measurements will act as a benchmark for future comparison after the reactors go into operation. The radiation measurements are continued during the operational phase of the plant and the results are compared to see whether there is any impact of the operation of the plant on the environment. A comprehensive background radiation monitoring plan has been in vogue at site from 2004 to meet this objective. This paper describes the different monitoring strategies adopted around Kudankulam Nuclear Power Project site and throws light on the pre operational background radiation levels in the environment

  8. The EOP Visualization Module Integrated into the Plasma On-Line Nuclear Power Plant Safety Monitoring and Assessment System

    International Nuclear Information System (INIS)

    Hornaes, Arne; Hulsund, John Einar; Vegh, Janos; Major, Csaba; Horvath, Csaba; Lipcsei, Sandor; Kapocs, Gyoergy

    2001-01-01

    An ambitious project to replace the unit information systems (UISs) at the Hungarian Paks nuclear power plant was started in 1998-99. The basic aim of the reconstruction project is to install a modern, distributed UIS architecture on all four Paks VVER-440 units. The new UIS includes an on-line plant safety monitoring and assessment system (PLASMA), which contains a critical safety functions monitoring module and provides extensive operator support during the execution of the new, symptom-oriented emergency operating procedures (EOPs). PLASMA includes a comprehensive EOP visualization module, based on the COPMA-III procedure-handling software developed by the Organization for Economic Cooperation and Development, Halden Reactor Project. Intranet technology is applied for the presentation of the EOPs with the use of a standard hypertext markup language (HTML) browser as a visualization tool. The basic design characteristics of the system, with a detailed description of its user interface and functions of the new EOP display module, are presented

  9. Comparative Study of the Use of Extensible Business Reporting Language (XBRL in Projects for the Supervision of Banking Institutions

    Directory of Open Access Journals (Sweden)

    Myrna Berríos Pagan

    2011-08-01

    Full Text Available The objective of this research is to make a comparative analysis of the use of Extensible Business Reporting Language (XBRL in the projects undertaken for the mandatory filing of banks’ financial information in the United States and the European Union. The agencies overseeing these filing requirements are the Federal Financial Institutions Examination Council (FFIEC and the Committee of European Banking Supervisors (CEBS in the United States and the European Union, respectively. This comparative analysis is made for the following five dimensions: 1 project definition and scope; 2 planned project activities and responsibilities of stakeholders; 3 project management methodology and process; 4 progress monitoring, deadlines, and milestones; and 5 outcomes in terms of project goals and objectives.

  10. A novel mobile system for radiation detection and monitoring

    Science.gov (United States)

    Biafore, Mauro

    2014-05-01

    A novel mobile system for real time, wide area radiation surveillance has been developed within the REWARD project, financed within the FP7 programme, theme SEC-2011.1.5-1 (Development of detection capabilities of difficult to detect radioactive sources and nuclear materials - Capability Project). The REWARD sensing units are small, mobile portable units with low energy consumption, which consist of new miniaturized solid-state radiation sensors: a CdZnTe detector for gamma radiation and a high efficiency neutron detector based on novel silicon technologies. The sensing unit is integrated by a wireless communication interface to send the data remotely to a monitoring base station as well as a GPS system to calculate the position of the tag. The system also incorporates middleware and high-level software to provide web-service interfaces for the exchange of information. A central monitoring and decision support system has been designed to process the data from the sensing units and to compare them with historical record in order to generate an alarm when an abnormal situation is detected. A security framework ensures protection against unauthorized access to the network and data, ensuring the privacy of the communications and contributing to the overall robustness and reliability of the REWARD system. The REWARD system has been designed for many different scenarios such as nuclear terrorism threats, lost radioactive sources, radioactive contamination or nuclear accidents. It can be deployed in emergency units and in general in any type of mobile or static equipment, but also inside public/private buildings or infrastructures. The complete system is scalable in terms of complexity and cost and offers very high precision on both the measurement and the location of the radiation. The modularity and flexibility of the system allows for a realistic introduction to the market. Authorities may start with a basic, low cost system and increase the complexity based on their

  11. Continuing pollution from the Rum Jungle U-Cu project: A critical evaluation of environmental monitoring and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Mudd, Gavin M., E-mail: Gavin.Mudd@eng.monash.edu.a [Environmental Engineering, Dept of Civil Engineering, Monash University, Clayton, VIC 3800 (Australia); Patterson, James [Environmental Engineering Consultant, Sydney, NSW (Australia)

    2010-05-15

    The former Rum Jungle uranium-copper project, Australia, is an internationally important case study on environmental pollution from and rehabilitation of mining. The Rum Jungle mining project is briefly reviewed, followed by a critical evaluation of monitoring data and pollution loads prior to and after rehabilitation - leading to the conclusion that rehabilitation has clearly failed the test of time after just two decades. The most critical findings are the need to understand pollution cycles holistically, and designing monitoring regimes to match, explicit inclusion of radiological criteria (lacking in original planning), and finally the need to set targets based on environmental criteria. Two examples include polluted groundwater which was excluded from rehabilitation and the poor design, construction and/or performance of engineered soil covers - both leading to increasing acid drainage impacts on the Finniss River. The critical review therefore presents a valuable case study of the environmental performance of uranium mine site rehabilitation. - The Rum Jungle U-Cu project underwent extensive rehabilitation in the 1980's, however, it remains a major cause of pollution to the Finniss River.

  12. Pilot research projects for underground disposal of radioactive wastes in the United States of America

    International Nuclear Information System (INIS)

    Stein, R.; Collyer, P.L.

    1984-01-01

    Disposal of commercial radioactive waste in the United States of America in a deep underground formation will ensure permanent isolation from the biosphere with minimal post-closure surveillance and maintenance. The siting, design and development, performance assessment, operation, licensing, certification and decommissioning of an underground repository have stimulated the development of several pilot research projects throughout the country. These pilot tests and projects, along with their resulting data base, are viewed as important steps in the overall location and construction of a repository. Beginning in the 1960s, research at pilot facilities has progressed from underground spent fuel tests in an abandoned salt mine to the production of vitrified nuclear waste in complex borosilicate glass logs. Simulated underground repository experiments have been performed in the dense basalts of Washington State, the volcanic tuffaceous rock of Nevada and both domal and bedded salts of Louisiana and Kansas. In addition to underground pilot in situ tests, other facilities have been constructed or modified to monitor the performance of spent fuel in dry storage wells and self-shielded concrete casks. As the National Waste Terminal Storage (NWTS) programme advances to the next stage of underground site characterization for each of three different geological sites, additional pilot facilities are under consideration. These include a Test and Evaluation Facility (TEF) for site verification and equipment performance and testing, as well as a salt testing facility for verification of in situ simulation equipment. Although not associated with the NWTS programme, the construction of the Waste Isolation Pilot Plant (WIPP) in the bedded salts of New Mexico is well under way for deep testing and experimentation with the defence programme's transuranic nuclear waste. (author)

  13. Modernization project of the rod control system and in-core instrumentation system for 34 units of the 900 MW French EDF fleet

    International Nuclear Information System (INIS)

    Tavolara, Ivan; Desgeorge, Romain; Verburgh, Pierre

    2014-01-01

    Rolls-Royce and Cegelec, in partnership, carry out a unique and considerable modernisation project of two Instrumentation and Control (I and C) systems for the entire 900 MWe fleet of Electricite De France (EDF). Both rod control (RCS) and reactor in-core measurement (RIC) systems are to be modernised in the frame of the third ten-year renovation of all 34 reactor units over 9 power plants. The RCS contributes to the control of nuclear power by actuating control rod drive mechanisms that allow insertion or withdrawal of control rods. The RCS has also monitoring functions such as controlling the actual rods' position as well as the functional consistency between commands and actual positions. The RIC system measures in-core neutron flux, providing useful information to the control room as well as to the reactor unit computer for further processing. The renovated systems shall replace the existing ageing analog technology by modern digital technology based on PLC (Programmable Logic Controllers) and FPGA (Field-Programmable Gate Array) in the case of power subassemblies of RCS. Both systems rely for certain functions on a common network linking the RCS and RIC networks, improving operations and maintenance thanks to a powerful Man Machine Interface at the different locations of the systems with an extensive suite of tools and diagnostic menus. The project whose design phase started in July 2006 is now in its deployment phase after the successful site implementation of both systems at the first of kind units of Tricastin and Fessenheim power plants, respectively in August 2009 and February 2010. With 20 units in operation in 2014, the deployment shall continue with the other 14 until 2020. Rolls-Royce has a broad range of civil nuclear expertise, including work related to licensing and safety reviews, engineering design, supply chain management, manufacturing, installation and commissioning of the nuclear island systems and equipment, as well as operational

  14. Secure Interoperable Open Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Magee, Thoman [Consolidated Edison Company Of New York, Inc., NY (United States)

    2014-12-28

    The Consolidated Edison, Inc., of New York (Con Edison) Secure Interoperable Open Smart Grid Demonstration Project (SGDP), sponsored by the United States (US) Department of Energy (DOE), demonstrated that the reliability, efficiency, and flexibility of the grid can be improved through a combination of enhanced monitoring and control capabilities using systems and resources that interoperate within a secure services framework. The project demonstrated the capability to shift, balance, and reduce load where and when needed in response to system contingencies or emergencies by leveraging controllable field assets. The range of field assets includes curtailable customer loads, distributed generation (DG), battery storage, electric vehicle (EV) charging stations, building management systems (BMS), home area networks (HANs), high-voltage monitoring, and advanced metering infrastructure (AMI). The SGDP enables the seamless integration and control of these field assets through a common, cyber-secure, interoperable control platform, which integrates a number of existing legacy control and data systems, as well as new smart grid (SG) systems and applications. By integrating advanced technologies for monitoring and control, the SGDP helps target and reduce peak load growth, improves the reliability and efficiency of Con Edison’s grid, and increases the ability to accommodate the growing use of distributed resources. Con Edison is dedicated to lowering costs, improving reliability and customer service, and reducing its impact on the environment for its customers. These objectives also align with the policy objectives of New York State as a whole. To help meet these objectives, Con Edison’s long-term vision for the distribution grid relies on the successful integration and control of a growing penetration of distributed resources, including demand response (DR) resources, battery storage units, and DG. For example, Con Edison is expecting significant long-term growth of DG

  15. Monitoring post-fire vegetation rehabilitation projects: A common approach for non-forested ecosystems

    Science.gov (United States)

    Wirth, Troy A.; Pyke, David A.

    2007-01-01

    Emergency Stabilization and Rehabilitation (ES&R) and Burned Area Emergency Response (BAER) treatments are short-term, high-intensity treatments designed to mitigate the adverse effects of wildfire on public lands. The federal government expends significant resources implementing ES&R and BAER treatments after wildfires; however, recent reviews have found that existing data from monitoring and research are insufficient to evaluate the effects of these activities. The purpose of this report is to: (1) document what monitoring methods are generally used by personnel in the field; (2) describe approaches and methods for post-fire vegetation and soil monitoring documented in agency manuals; (3) determine the common elements of monitoring programs recommended in these manuals; and (4) describe a common monitoring approach to determine the effectiveness of future ES&R and BAER treatments in non-forested regions. Both qualitative and quantitative methods to measure effectiveness of ES&R treatments are used by federal land management agencies. Quantitative methods are used in the field depending on factors such as funding, personnel, and time constraints. There are seven vegetation monitoring manuals produced by the federal government that address monitoring methods for (primarily) vegetation and soil attributes. These methods vary in their objectivity and repeatability. The most repeatable methods are point-intercept, quadrat-based density measurements, gap intercepts, and direct measurement of soil erosion. Additionally, these manuals recommend approaches for designing monitoring programs for the state of ecosystems or the effect of management actions. The elements of a defensible monitoring program applicable to ES&R and BAER projects that most of these manuals have in common are objectives, stratification, control areas, random sampling, data quality, and statistical analysis. The effectiveness of treatments can be determined more accurately if data are gathered using

  16. Audit of United States portion of the International Thermonuclear Experimental Reactor project

    International Nuclear Information System (INIS)

    1993-01-01

    Worldwide efforts in fusion energy research are designed to develop fusion power as a safe, environmentally sound, and economically competitive source of energy. The International Thermonuclear Experimental Reactor (ITER) project is a worldwide effort to demonstrate the scientific and technological feasibility of fusion power. The European Community, Japan, the Russian Federation, and the United States are collaborating on ITER, with each of the four parties expected to equally share costs and benefits. Shared costs for the current engineering design phase of the project are estimated at $1 billion in 1989 dollars, excluding certain management and support costs to be absorbed by each partner, with an early estimate of $6 billion, also in 1989 dollars, for construction of the reactor. Engineering design formally began in July 1992, and this phase is in its formative stages. The US had already spent about $100 million since 1987 on ITER conceptual design activities and other preparatory activities in advance of the engineering design phase. Because of its cost significance, the importance of ITER to the US fusion energy program, and the project's unique aspects which may provide a framework for future international endeavors, we initiated an audit of the ITER project. The purpose of the audit was to evaluate management controls over the US portion of the ITER project. Our objectives was to determine whether key front-end controls were in place to ensure that the project could be managed in an efficient and effective manner

  17. ATP bioluminescence: Surface hygiene monitoring in milk preparation room of neonatal intensive care unit

    Science.gov (United States)

    Mohamad, Mahirah; Ishak, Shareena; Jaafar, Rohana; Sani, Norrakiah Abdullah

    2018-04-01

    ATP Bioluminescence application and standard microbiological analyses were used to evaluate the cleanliness of milk contact surfaces and non-milk contact surfaces in milk preparation room of neonatal intensive care unit (NICU) of Universiti Kebangsaan Malaysia Medical Centre (UKMMC). A total of 44 samples including the breast pump, milk bottle, milk bottle screw top and screw ring, teats, measuring cups, waterless warmer, refrigerator, dishwasher and pasteurizer inner wall were tested on May 2017. 3M Clean and Trace Hygiene Monitoring (UXL100 ATP Test swabs) and the bioluminescence reader Clean-Trace NG Luminometer (3M) were used to measure the Relative Light Unit (RLU) and microbiological analysis using 3M Quick Swab and 3MTM PetrifilmTM for enumeration of aerobic count, Staphylococcus aureus, Enterobacteriaceae, coliform and detection of Escherichia coli (CFU /100cm2 or utensil/item). The RLU values were from 11 to 194 and passed the ATP benchmark for intensive care unit (ICU), < 250 RLU as recommended. Aerobic colony count was only found in waterless warmer (0.05±0.01 mean log CFU/warmer). None of S. aureus, Enterobacteriaceae, E. coli and coliform was detected in all samples. A weak correlation was found between bioluminescence measurements RLU and the microbiological analysis (CFU). However, the use of ATP bioluminescence in monitoring milk preparation room cleanliness can be a useful method for assessing rapidly the surface hygiene as well as to verify the Sanitation Standard Operating Procedure (SSOP) prior to implementation of Hazard Analysis and Critical Control Points (HACCP) in milk preparation room.

  18. The design preparation for radiation monitoring system in the frame of completion NPP Mochovce Units 3 and 4

    International Nuclear Information System (INIS)

    Sevecka, S.; Slavik, O.; Kapisovsky, V.

    2009-01-01

    In 1985 a Basic Design of Radiation Monitoring System (RMS) has been elaborated for Mochovce NPP unit 3 and 4 construction. Due to construction interruption in the following years this design solution became obsolete. A new solution of RMS have been developed with conception following that of original Basic Design accommodating also safety measures implemented in RMS of NPP EMO units 1 and 2, and based on modem instrumentation and computer technique. Following the updating of Basic Design documentation the preparation of elaboration of RMS detailed design was carried on. In the frame of this preparation a review of possible suppliers of instrumentation satisfying the conception of radiation monitoring system and the extension of required deliveries has been made. Also criteria on RMS suppliers selection have been determined. The types of monitoring systems and equipment, as well as their quantities, have been specified based on updated Basic Design requirements and production profiles and possibilities of potential suppliers. The required parameters of measurements (including measurement geometry) have been evaluated, as well as requirements of legislation and requirements of proposed RMS architecture. (authors)

  19. Blind test results - measure of incessant progress in personnel monitoring services at Kudankulam Nuclear Power Project

    International Nuclear Information System (INIS)

    Jashi, K.B.; Ashok Kumar, A.; Pandaram, P.

    2018-01-01

    Personnel Monitoring Services (PMS) at Thermoluminescent Dosimeter (TLD) laboratory, Kudankulam Nuclear Power Project (KKNPP) involve monitoring of about 1500 radiation workers of KKNPP for external radiation exposure on monthly basis. Quality assurance in PMS provides an overall estimate of accuracy which depends not only upon the dosimeter quality and reader performance but also on data interpretation, applicable software and the system. Therefore it measures the effectiveness of quality control mechanism. Blind test is an effective tool to check the performance of the processor without their knowledge during routine processing of the service cards

  20. Methodology of impact assessment of research projects

    International Nuclear Information System (INIS)

    Rodriguez Cardona, R.; Cobas Aranda, M.

    2014-01-01

    In the context of the management of research projects development it is necessary to have tools to monitor and evaluate progress and the performance of the projects, as well as their results and the impact on society (international agencies of the United Nations and the States 2002 and 2005 Paris Declaration), with the objective of to ensure their contribution to the social and economic development of countries. Many organizations, agencies and Governments apply different methodologies (IDB, World Bank, UNDP, ECLAC, UNESCO; UNICEF, Canada, Japan, other) for these purposes. In the results-based project management system not only paramount is the process or product itself, but also the result or impact of the project (if the program/project produced the effects desired persons, households and institutions and whether those effects are attributable to the intervention of the program / project). The work shows a methodology that allows for a qualitative and quantitative evaluation of impact of research projects and has been result of experience in project management of international collaboration with the International Agency for Atomic Energy (IAEA) and the Cuban Nuclear programme. (author)

  1. Extremely high resolution corrosion monitoring of pipelines: retrofittable, non-invasive and real-time

    Energy Technology Data Exchange (ETDEWEB)

    Baltzersen, Oeystein; Tveit, Edd [Sensorlink AS, Trondheim (Norway); Verley, Richard [StatoilHydro ASA, Stockholm (Sweden)

    2009-07-01

    The Ultramonit unit is a clamp-on tool (removable) that uses an array of sensors to provide online, real-time, reliable and repeatable high accuracy ultrasonic wall thickness measurements and corrosion monitoring at selected locations along the pipeline. The unit can be installed on new or existing pipelines by diver or ROV. The system is based on the well-established ultrasonic pulse-echo method (A-scan). Special processing methods, and the fact that the unit is fixed to the pipeline, enable detection of changes in wall thickness in the micro-meter range. By utilizing this kind of resolution, it is possible to project corrosion rates in hours or days. The tool is used for calibration of corrosion inhibitor programs, verification and calibration of inspection pig data and general corrosion monitoring of new and existing pipelines. (author)

  2. Projecting the Effect of Changes in Smoking and Obesity on Future Life Expectancy in the United States

    OpenAIRE

    Preston, Samuel H.; Stokes, Andrew; Mehta, Neil K.; Cao, Bochen

    2013-01-01

    We estimate the effects of declining smoking and increasing obesity on mortality in the United States over the period 2010?2040. Data on cohort behavioral histories are integrated into these estimates. Future distributions of body mass indices are projected using transition matrices applied to the initial distribution in 2010. In addition to projections of current obesity, we project distributions of obesity when cohorts are age 25. To these distributions, we apply death rates by current and ...

  3. Projected climate change impacts on skiing and snowmobiling: A case study of the United States

    Science.gov (United States)

    A physically-based water and energy balance model is used to simulate natural snow accumulation at 247 winter recreation locations across the continental United States. We combine this model with projections of snowmaking conditions to determine downhill skiing, cross-country ski...

  4. 12 CFR 1291.7 - Monitoring.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Monitoring. 1291.7 Section 1291.7 Banks and... HOUSING PROGRAM § 1291.7 Monitoring. (a) Competitive application program—(1) Initial monitoring policies... connection with the project. (ii) Back-up and other project documentation. The Bank's written monitoring...

  5. Independent calculation of the monitor units and times of treatment in radiotherapy

    International Nuclear Information System (INIS)

    Mueller, Marcio Rogerio

    2005-01-01

    In this work, an independent verification system of calculations in radiotherapy was developed and applied, using Visual Basic TM programming language. The computational program performs calculations of monitor units and treatment time, based on the algorithm of manual calculation. The calculations executed for the independent system had initially been compared with the manual calculations performed by the medical physicists of the Institute of Radiotherapy of the Hospital das Clinicas da Universidade de Sao Paulo. In this step, the results found for more than two hundred fields studied were similar to those found in the literature; deviations larger than +- 1% were found only in five cases involving errors in manual calculation. The application of the independent system, in this stage, could have identified errors up to +- 2,4%. Based on these data, the system was validated for use in clinical routine. In a second step, calculations were compared with calculations realized by the treatment computerized planning system CadPIan TM . When, again, the results were similar to those published in other works allowing to obtain levels of acceptance of the discrepancies between the calculations executed for the independent system and the calculations developed from the planning system, separated by anatomical region, as recommended according by the recent literature. For beams of 6 MV, the levels of acceptance for deviations between the calculations of monitor units, separated by treatment region were the following; breast +- 1.7%, head and neck +2%; hypophysis +- 2.2%; pelvis +- 4 . 1% and thorax +- 1.5%. For beams of 15 MV, the level suggested for pelvis was of +- 4.5%. (author)

  6. Optimization of the choice of unmanned aerial vehicles used to monitor the implementation of selected construction projects

    Science.gov (United States)

    Skorupka, Dariusz; Duchaczek, Artur; Waniewska, Agnieszka; Kowacka, Magdalena

    2017-07-01

    Due to their properties unmanned aerial vehicles have huge number of possibilities for application in construction engineering. The nature and extent of construction works performedmakes the decision to purchase the right equipment significant for the possibility for its further use while monitoring the implementation of these works. Technical factors, such as the accuracy and quality of the applied measurement instruments are especially important when monitoring the realization of construction projects. The paper presents the optimization of the choice of unmanned aerial vehicles using the Bellinger method. The decision-making analysis takes into account criteria that are particularly crucial by virtue of the range of monitoring of ongoing construction works.

  7. Monitoring man's impact in the coastal zone

    International Nuclear Information System (INIS)

    Benton, A.R. Jr.; Snell, W.W.

    1979-01-01

    The paper examines the monitoring of man's impact in the coastal zone. Color infrared photography shows destroyed or degraded wetlands or beaches, and makes possible relevant linear or aerial measurements with aerial photography. It can also categorize the environmental impacts which have accrued as the result of completion of water development projects. Aerial photography of the Texas coastal zone illustrates the nature and degree of damage likely to occur as a result of construction or maintenance projects. It is concluded that the method of assigning realistic values to unit areas of wetlands and beaches will make it feasible to incorporate the cost of estuarine damages into the cost estimates of water development schemes

  8. Environmental monitoring with advanced data transfer and presentation techniques

    International Nuclear Information System (INIS)

    Toivonen, H.; Lahtinen, J.; Koivukoski, J.; Rantanen, H.; Haaslahti, J.

    1995-01-01

    In an emergency, the needs for information are overwhelming, as was shown during the Chernobyl accident in 1986. To improve environmental radiation monitoring and to make communication easy, the Finnish authorities launched an extensive development project in 1991. VTKK Group Ltd took over the software design. A brief description of system architecture, automatic data collection, manual input, mobile units, transfer of results and handling of alarms is given. 2 figs

  9. GIS-project: geodynamic globe for global monitoring of geological processes

    Science.gov (United States)

    Ryakhovsky, V.; Rundquist, D.; Gatinsky, Yu.; Chesalova, E.

    2003-04-01

    reflect in diagram form a total combination and dynamics of data on the geological structure, geophysical fields, seismicity, geomagnetism, composition of rock complexes, and metalloge-ny of different areas on the Earth's surface. They give us possibility to scale, detail, and develop 3D spatial visualization. Information filling the covers could be replenished as in the existing so in newly formed databases with new data. The integrated analyses of the data allows us more precisely to define our ideas on regularities in development of lithosphere and mantle unhomogeneities using some original technologies. It also enables us to work out 3D digital models for geodynamic development of tectonic zones in convergent and divergent plate boundaries with the purpose of integrated monitoring of mineral resources and establishing correlation between seismicity, magmatic activity, and metallogeny in time-spatial co-ordinates. The created multifold geoinformation system gives a chance to execute an integral analyses of geoinformation flows in the interactive regime and, in particular, to establish some regularities in the time-spatial distribution and dynamics of main structural units in the lithosphere, as well as illuminate the connection between stages of their development and epochs of large and supperlarge mineral deposit formation. Now we try to use the system for prediction of large oil and gas concentration in the main sedimentary basins. The work was supported by RFBR, (grants 93-07-14680, 96-07-89499, 99-07-90030, 00-15-98535, 02-07-90140) and MTC.

  10. Projecting climate effects on birds and reptiles of the Southwestern United States

    Science.gov (United States)

    van Riper, Charles; Hatten, James R.; Giermakowski, J. Tomasz; Mattson, David; Holmes, Jennifer A.; Johnson, Matthew J.; Nowak, Erika M.; Ironside, Kirsten; Peters, Michael; Heinrich, Paul; Cole, K.L.; Truettner, C.; Schwalbe, Cecil R.

    2014-01-01

    We modeled the current and future breeding ranges of seven bird and five reptile species in the Southwestern United States with sets of landscape, biotic (plant), and climatic global circulation model (GCM) variables. For modeling purposes, we used PRISM data to characterize the climate of the Western United States between 1980 and 2009 (baseline for birds) and between 1940 and 2009 (baseline for reptiles). In contrast, we used a pre-selected set of GCMs that are known to be good predictors of southwestern climate (five individual and one ensemble GCM), for the A1B emission scenario, to characterize future climatic conditions in three time periods (2010–39; 2040–69; and, 2070–99). Our modeling approach relied on conceptual models for each target species to inform selection of candidate explanatory variables and to interpret the ecological meaning of developed probabilistic distribution models. We employed logistic regression and maximum entropy modeling techniques to create a set of probabilistic models for each target species. We considered climatic, landscape, and plant variables when developing and testing our probabilistic models. Climatic variables included the maximum and minimum mean monthly and seasonal temperature and precipitation for three time periods. Landscape features included terrain ruggedness and insolation. We also considered plant species distributions as candidate explanatory variables where prior ecological knowledge implicated a strong association between a plant and animal species. Projected changes in range varied widely among species, from major losses to major gains. Breeding bird ranges exhibited greater expansions and contractions than did reptile species. We project range losses for Williamson’s sapsucker and pygmy nuthatch of a magnitude that could move these two species close to extinction within the next century. Although both species currently have a relatively limited distribution, they can be locally common, and neither

  11. Integrating Forage, Wildlife, Water, and Fish Projections with Timber Projections at the Regional Level: A Case Study in Southern United States

    Science.gov (United States)

    Linda A. Joyce; Curtis H. Flather; Patricia A. Flebbe; Thomas W. Hoekstra; Stan J. Ursic

    1990-01-01

    The impact of timber management and land-use change on forage production, turkey and deer abundance, red-cockaded woodpecker colonies, water yield, and trout abundance was projected as part of a policy study focusing on the southern United States. The multiresource modeling framework used in this study linked extant timber management and land-area policy models with...

  12. Design description of a microprocessor based Engine Monitoring and Control unit (EMAC) for small turboshaft

    Science.gov (United States)

    Baez, A. N.

    1985-01-01

    Research programs have demonstrated that digital electronic controls are more suitable for advanced aircraft/rotorcraft turbine engine systems than hydromechanical controls. Commercially available microprocessors are believed to have the speed and computational capability required for implementing advanced digital control algorithms. Thus, it is desirable to demonstrate that off-the-shelf microprocessors are indeed capable of performing real time control of advanced gas turbine engines. The engine monitoring and control (EMAC) unit was designed and fabricated specifically to meet the requirements of an advanced gas turbine engine control system. The EMAC unit is fully operational in the Army/NASA small turboshaft engine digital research program.

  13. Application for verification of monitor units of the treatment planning system; Aplicacion para la verificacion de unidades monitor del sistema de planificacion de tratamientos

    Energy Technology Data Exchange (ETDEWEB)

    Suero Rodrigo, M. A.; Marques Fraguela, E.

    2011-07-01

    Current estimates algorithms achieve acceptable degree of accuracy. However, operate on the basis of un intuitive models. It is therefore necessary to verify the calculation of monitor units of the treatment planning system (PTS) with those obtained by other independent formalisms. To this end, we have developed an application based on factorization formalism that automates the calculation of dose.

  14. Landscape scale ecological monitoring as part of an EIA of major construction activities: experience at the Turkish section of the BTC crude oil pipeline project.

    Science.gov (United States)

    Sahin, Sükran; Kurum, Ekrem

    2009-09-01

    Ecological monitoring is a complementary component of the overall environmental management and monitoring program of any Environmental Impact Assessment (EIA) report. The monitoring method should be developed for each project phase and allow for periodic reporting and assessment of compliance with the environmental conditions and requirements of the EIA. Also, this method should incorporate a variance request program since site-specific conditions can affect construction on a daily basis and require time-critical application of alternative construction scenarios or environmental management methods integrated with alternative mitigation measures. Finally, taking full advantage of the latest information and communication technologies can enhance the quality of, and public involvement in, the environmental management program. In this paper, a landscape-scale ecological monitoring method for major construction projects is described using, as a basis, 20 months of experience on the Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project, covering Turkish Sections Lot B and Lot C. This analysis presents suggestions for improving ecological monitoring for major construction activities.

  15. RCRA [Resource Conservation and Recovery Act] ground-water monitoring projects for Hanford facilities: Annual progress report for 1988

    International Nuclear Information System (INIS)

    Fruland, R.M.; Lundgren, R.E.

    1989-04-01

    This report describes the progress during 1988 of 14 Hanford Site ground-water monitoring projects covering 16 hazardous waste facilities and 1 nonhazardous waste facility (the Solid Waste Landfill). Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act (RCRA) of 1976 and the State of Washington Administrative Code. 21 refs., 23 figs., 8 tabs

  16. Design of a microprocessor-based Control, Interface and Monitoring (CIM unit for turbine engine controls research

    Science.gov (United States)

    Delaat, J. C.; Soeder, J. F.

    1983-01-01

    High speed minicomputers were used in the past to implement advanced digital control algorithms for turbine engines. These minicomputers are typically large and expensive. It is desirable for a number of reasons to use microprocessor-based systems for future controls research. They are relatively compact, inexpensive, and are representative of the hardware that would be used for actual engine-mounted controls. The Control, Interface, and Monitoring Unit (CIM) contains a microprocessor-based controls computer, necessary interface hardware and a system to monitor while it is running an engine. It is presently being used to evaluate an advanced turbofan engine control algorithm.

  17. Detector Unit

    CERN Multimedia

    1960-01-01

    Original detector unit of the Instituut voor Kernfysisch Onderzoek (IKO) BOL project. This detector unit shows that silicon detectors for nuclear physics particle detection were already developed and in use in the 1960's in Amsterdam. Also the idea of putting 'strips' onto the silicon for high spatial resolution of a particle's impact on the detector were implemented in the BOL project which used 64 of these detector units. The IKO BOL project with its silicon particle detectors was designed, built and operated from 1965 to roughly 1977. Detector Unit of the BOL project: These detectors, notably the ‘checkerboard detector’, were developed during the years 1964-1968 in Amsterdam, The Netherlands, by the Natuurkundig Laboratorium of the N.V. Philips Gloeilampen Fabrieken. This was done in close collaboration with the Instituut voor Kernfysisch Onderzoek (IKO) where the read-out electronics for their use in the BOL Project was developed and produced.

  18. A multi-modal geological investigation framework for subsurface modeling and kinematic monitoring of a slow-moving landslide complex in Colorado, United States

    Science.gov (United States)

    Lowry, B. W.; Zhou, W.; Smartgeo

    2010-12-01

    The Muddy Creek landslide complex is a large area of active and reactivating landslides that impact the operation of both a state highway and Paonia Reservoir in Gunnison County, Colorado, United States. Historically, the monitoring of this slide has been investigated using disparate techniques leading to protracted analysis and project knowledge attrition. We present an integrated, data-driven investigation framework that supports continued kinematic monitoring, document cataloging, and subsurface modeling of the landslide complex. A geospatial information system (GIS) was integrated with a visual programming based subsurface model to facilitate modular integration of monitoring data with borehole information. Subsurface modeling was organized by material type and activity state based on multiple sources of kinematic measurement. The framework is constructed to modularly integrate remotely sensed imagery and other spatial datasets such as ASTER, InSAR, and LiDAR derived elevation products as more precise datasets become available. The framework allows for terrestrial LiDAR survey error estimation, borehole siting, and placement of wireless sensor (GPS, accelerometers, geophysical ) networks for optimized spatial relevance and utility. Coordinated spatial referencing within the GIS facilitates geotechnical and hydrogeological modeling input generation and common display of modeling outputs. Kinematic data fusion techniques are accomplished with integration of instrumentation, surficial feature tracking, subsurface classification, and 3D interpolation. The framework includes dynamic decision support including landslide dam failure estimates, back-flooding scenario planning that can be accessed by multiple agencies and stakeholders.

  19. The whiteStar development project: Westinghouse's next generation core design simulator and core monitoring software to power the nuclear renaissance

    International Nuclear Information System (INIS)

    Boyd, W. A.; Mayhue, L. T.; Penkrot, V. S.; Zhang, B.

    2009-01-01

    The WhiteStar project has undertaken the development of the next generation core analysis and monitoring system for Westinghouse Electric Company. This on-going project focuses on the development of the ANC core simulator, BEACON core monitoring system and NEXUS nuclear data generation system. This system contains many functional upgrades to the ANC core simulator and BEACON core monitoring products as well as the release of the NEXUS family of codes. The NEXUS family of codes is an automated once-through cross section generation system designed for use in both PWR and BWR applications. ANC is a multi-dimensional nodal code for all nuclear core design calculations at a given condition. ANC predicts core reactivity, assembly power, rod power, detector thimble flux, and other relevant core characteristics. BEACON is an advanced core monitoring and support system which uses existing instrumentation data in conjunction with an analytical methodology for on-line generation and evaluation of 3D core power distributions. This new system is needed to design and monitor the Westinghouse AP1000 PWR. This paper describes provides an overview of the software system, software development methodologies used as well some initial results. (authors)

  20. Unite research with what citizens do for fun: "recreational monitoring" of marine biodiversity.

    Science.gov (United States)

    Goffredo, Stefano; Pensa, Francesco; Neri, Patrizia; Orlandi, Antonio; Gagliardi, Maria Scola; Velardi, Angela; Piccinetti, Corrado; Zaccanti, Francesco

    2010-12-01

    Institutes often lack funds and manpower to perform large-scale biodiversity monitoring. Citizens can be involved, contributing to the collection of data, thus decreasing costs. Underwater research requires specialist skills and SCUBA certification, and it can be difficult to involve volunteers. The aim of this study was to involve large numbers of recreational divers in marine biodiversity monitoring for increasing the environmental education of the public and collecting data on the status of marine biodiversity. Here we show that thousands of recreational divers can be enrolled in a short time. Using specially formulated questionnaires, nonspecialist volunteers reported the presence of 61 marine taxa encountered during recreational dives, performed as regular sport dives. Validation trials were carried out to assess the accuracy and consistency of volunteer-recorded data, and these were compared to reference data collected by an experienced researcher. In the majority of trials (76%) volunteers performed with an accuracy and consistency of 50-80%, comparable to the performance of conservation volunteer divers on precise transects in other projects. The recruitment of recreational divers involved the main diving and tour operators in Italy, a popular scientific magazine, and mass media. During the four-year study, 3825 divers completed 18757 questionnaires, corresponding to 13539 diving hours. The volunteer-sightings-based index showed that in the monitored area the biodiversity status did not change significantly within the project time scale, but there was a significant negative correlation with latitude, suggesting improved quality in the southernmost areas. This trend could be related to the presence of stressors in the northern areas and has been supported by investigations performed by the Italian Ministry of the Environment. The greatest limitation with using volunteers to collect data was the uneven spatial distribution of samples. The benefits were the

  1. Evaluation of eleven years of area monitoring in ore treatment unit: I external exposure

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, W.S.; Py Junior, D.A.; Oliveira, S.Q. de; Dantas, M.V.A., E-mail: pereiraws@gmail.com [Industrias Nucleares do Brasil (INB), Pocos de Caldas, MG (Brazil). Unidade de Tratamento de Minerio. Grupo Multidisciplinar de Radioprotecao; Kelecom, A., E-mail: akelecom@id.uff.br [Universidade Federal Fluminense (LARARA-PLS/GETA/UFF), Niteroi, RJ (Brazil). Laboratorio de Radiobiologia e Radiometria Pedro Lopes dos Santos. Grupo de Estudos em Temas Ambientais; Pereira, J.R.S., E-mail: pereirarsj@gmail.com [Universidade Federal de Alfenas (UNIFAL), Pocos de Caldas, MG (Brazil)

    2013-07-01

    The Ore Treatment Unit (OTU) is an uranium mining and milling complex deactivated in 1995 that operated monazite during the years 2004 and 2005 in a plant used especially for that purpose called Chemical Treatment of Monazite (CTM). This study aims to analyze the monitoring of area to exposure rate from 2002 to 2012, comparing periods of suspended operation of OTU and identifying the influences of CTM and of the radioactive waste deposit, from other facilities of OTU. A total of 22,294 samples were analyzed for area dose rates; average values were obtained of 6.74 μSv h{sup -1} with an amplitude from 0 to 420 μSv h{sup -1}. 92% of the monitoring were below the derivative limit for workers, and 1,702 monitoring samples showed values above this limit. Ignoring the monitoring that was realized at CTM and at the deposit of radioactive waste, the number of monitoring samples were reduced to 1,341. In this case, the average reduces to 0.96 μSv h{sup -1}, going from 0 to 25 μSv h{sup -1}, only 15 samples remained above the threshold for workers and 675 samples were below the limit for individual public. It can be concluded that the OTU is an installation with nearly 99% of monitoring area safe for workers and 50% for individual public. The inclusion of new practices (CTM) and the deposit of radioactive waste coming from other facilities alter this picture dramatically, increased the dose rates. (author)

  2. Post-construction monitoring of a Core-Loc™ breakwater using tripod-based LiDAR

    Science.gov (United States)

    Podoski, Jessica H.; Bawden, Gerald W.; Bond, Sandra; Smith, Thomas D.; Foster, James

    2010-01-01

    The goal of the technology application described herein is to determine whether breakwater monitoring data collected using Tripod (or Terrestrial) Light Detection and Ranging (T-LiDAR) can give insight into processes such as how Core-Loc™ concrete armour units nest following construction, and in turn how settlement affects armour layer stability, concrete cap performance, and armour unit breakage.  A further objective is that this information can then be incorporated into the design of future projects using concrete armour units.  The results of this application of T-LiDAR, including the challenges encountered and the conclusions drawn regarding initial concrete armour unit movement will be presented in this paper.

  3. GULF OF MEXICO SEAFLOOR STABILITY AND GAS HYDRATE MONITORING STATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Robert Woolsey; Thomas M. McGee; Robin C. Buchannon

    2004-11-01

    The gas hydrates research Consortium (HRC), established and administered at the University if Mississippi's Center for Marine Research and Environmental Technology (CMRET) has been active on many fronts in FY 03. Extension of the original contract through March 2004, has allowed completion of many projects that were incomplete at the end of the original project period due, primarily, to severe weather and difficulties in rescheduling test cruises. The primary objective of the Consortium, to design and emplace a remote sea floor station for the monitoring of gas hydrates in the Gulf of Mexico by the year 2005 remains intact. However, the possibility of levering HRC research off of the Joint Industries Program (JIP) became a possibility that has demanded reevaluation of some of the fundamental assumptions of the station format. These provisions are discussed in Appendix A. Landmark achievements of FY03 include: (1) Continuation of Consortium development with new researchers and additional areas of research contribution being incorporated into the project. During this period, NOAA's National Undersea Research Program's (NURP) National Institute for Undersea Science and Technology (NIUST) became a Consortium funding partner, joining DOE and Minerals Management Service (MMS); (2) Very successful annual and semiannual meetings in Oxford Mississippi in February and September, 2003; (3) Collection of piston cores from MC798 in support of the effort to evaluate the site for possible monitoring station installation; (4) Completion of the site evaluation effort including reports of all localities in the northern Gulf of Mexico where hydrates have been documented or are strongly suspected to exist on the sea floor or in the shallow subsurface; (5) Collection and preliminary evaluation of vent gases and core samples of hydrate from sites in Green Canyon and Mississippi Canyon, northern Gulf of Mexico; (6) Monitoring of gas activity on the sea floor, acoustically

  4. 78 FR 7411 - Vessel Monitoring Systems (VMS); Certification of New VMS Unit for Use in Northeast Fisheries

    Science.gov (United States)

    2013-02-01

    ... Monitoring Systems (VMS); Certification of New VMS Unit for Use in Northeast Fisheries AGENCY: National... used effective January 24, 2013. FOR FURTHER INFORMATION CONTACT: Office of Law Enforcement, Northeast Division, Northeast VMS Team, telephone 978-281-9213. SUPPLEMENTARY INFORMATION: Regulations at 50 CFR 648...

  5. Second unit scheduling concerns on a dual-unit nuclear project

    International Nuclear Information System (INIS)

    Block, H.R.; Mazzini, R.A.

    1978-01-01

    This paper explores the planning and scheduling problems of Unit 2 of the Susquehanna steam electric station. The causes of these problems and methods to avoid or mitigate their consequences are discussed. The Susquehanna steam electric station has two boiling water reactors rated at 1,100 MW each. Topics considered include cost factors, structures, equipment, engineering and home office, construction services, completion data phasing, work sequencing, structural dependences, and segregation. Substatial cost and schedule benefits can result if two nuclear units are designed and constructed as one integral station, and if maximum sharing of facilities and services between the units occurs. It is concluded that the cost benefits of highly integrated dual unit construction outweigh the schedule and logistical problems caused by that approach

  6. Project monitor. Final report. [Allegheny County, PA

    Energy Technology Data Exchange (ETDEWEB)

    Hammond, P.Y.; Beck, P.; Doctors, S.I.

    1979-04-27

    Results are reported of a study of consumers' energy attitudes and behavior. Household consumers and small business consumers (both retail and manufacturing) responded to the survey, but only the household results are reported. The study sought to understand energy-related behavior at the level where the various components of energy policy intersect. Attempts are made to attain this goal by determining the extent to which various properties of the individuals and firms are associated with various amounts of conservation. A representative sample of the adult population in Allegheny County, Pennsylvania was interviewed. Part I introduces the measures of household conservation to be used in the survey. Part II analyzes each of the types of energy conservation - general, winterization, heating, cooling, appliance, transportation, and electricity reductions - and relates them to demographic, situation, attitudinal, and perceptual variables in the household sample. Part III deals with the impacts of Project Pacesetter and the United Mine Workers' strike against the coal operators - particularly, the impact of the coal strike on household residents of Allegheny County. Part IV summarizes the findings and uses them for recommendations regarding energy conservation policy. Additional data are presented in 4 appendices. (MCW)

  7. The application of projected conjugate gradient solvers on graphical processing units

    International Nuclear Information System (INIS)

    Lin, Youzuo; Renaut, Rosemary

    2011-01-01

    Graphical processing units introduce the capability for large scale computation at the desktop. Presented numerical results verify that efficiencies and accuracies of basic linear algebra subroutines of all levels when implemented in CUDA and Jacket are comparable. But experimental results demonstrate that the basic linear algebra subroutines of level three offer the greatest potential for improving efficiency of basic numerical algorithms. We consider the solution of the multiple right hand side set of linear equations using Krylov subspace-based solvers. Thus, for the multiple right hand side case, it is more efficient to make use of a block implementation of the conjugate gradient algorithm, rather than to solve each system independently. Jacket is used for the implementation. Furthermore, including projection from one system to another improves efficiency. A relevant example, for which simulated results are provided, is the reconstruction of a three dimensional medical image volume acquired from a positron emission tomography scanner. Efficiency of the reconstruction is improved by using projection across nearby slices.

  8. The application of projected conjugate gradient solvers on graphical processing units

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Youzuo [Los Alamos National Laboratory; Renaut, Rosemary [ARIZONA STATE UNIV.

    2011-01-26

    Graphical processing units introduce the capability for large scale computation at the desktop. Presented numerical results verify that efficiencies and accuracies of basic linear algebra subroutines of all levels when implemented in CUDA and Jacket are comparable. But experimental results demonstrate that the basic linear algebra subroutines of level three offer the greatest potential for improving efficiency of basic numerical algorithms. We consider the solution of the multiple right hand side set of linear equations using Krylov subspace-based solvers. Thus, for the multiple right hand side case, it is more efficient to make use of a block implementation of the conjugate gradient algorithm, rather than to solve each system independently. Jacket is used for the implementation. Furthermore, including projection from one system to another improves efficiency. A relevant example, for which simulated results are provided, is the reconstruction of a three dimensional medical image volume acquired from a positron emission tomography scanner. Efficiency of the reconstruction is improved by using projection across nearby slices.

  9. Safety measures for the main control board replacement project at Ikata units 1 and 2

    International Nuclear Information System (INIS)

    Hashimoto, Nozomu; Tada, Kenji

    2013-01-01

    When Units 1 and 2 of the Ikata Power Station underwent replacement of their main control boards, control cabinets, and associated equipment, it was necessary to remove all the control boards, cabinets, and cables from the control building including from the main control room. This meant the loss of operation and monitoring functions in the main control room and functions of control cabinets. To maintain the operation and monitoring functions required under plant shutdown conditions, temporary operation and monitoring equipment (i.e., temporary main control board) was installed in the temporary main control room. The advance preparations included a trial switching from the permanent to the temporary main control board to identify and address potential problems in advance. When the replacement work was underway, a work schedule sheet posted in the temporary and the permanent control rooms was used to prevent human errors caused by operators’ recognition errors. Monitoring and control signals were switched from the old boards to the temporary boards and from the temporary boards to the new boards at appropriate timings to ensure plant safety during the replacement operation. (author)

  10. Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Worthington, Monty [ORPC Alaska, LLC, Anchorage, AK (United States)

    2014-02-05

    Cook Inlet, Alaska is home to some of the greatest tidal energy resources in the U.S., as well as an endangered population of beluga whales (Delphinapterus leucas). Successfully permitting and operating a tidal power project in Cook Inlet requires a biological assessment of the potential and realized effects of the physical presence and sound footprint of tidal turbines on the distribution, relative abundance, and behavior of Cook Inlet beluga whales. ORPC Alaska, working with the Project Team—LGL Alaska Research Associates, University of Alaska Anchorage, TerraSond, and Greeneridge Science—undertook the following U.S. Department of Energy (DOE) study to characterize beluga whales in Cook Inlet – Acoustic Monitoring of Beluga Whale Interactions with the Cook Inlet Tidal Energy Project (Project). ORPC Alaska, LLC, is a wholly-owned subsidiary of Ocean Renewable Power Company, LLC, (collectively, ORPC). ORPC is a global leader in the development of hydrokinetic power systems and eco-conscious projects that harness the power of ocean and river currents to create clean, predictable renewable energy. ORPC is developing a tidal energy demonstration project in Cook Inlet at East Foreland where ORPC has a Federal Energy Regulatory Commission (FERC) preliminary permit (P-13821). The Project collected baseline data to characterize pre-deployment patterns of marine mammal distribution, relative abundance, and behavior in ORPC’s proposed deployment area at East Foreland. ORPC also completed work near Fire Island where ORPC held a FERC preliminary permit (P-12679) until March 6, 2013. Passive hydroacoustic devices (previously utilized with bowhead whales in the Beaufort Sea) were adapted for study of beluga whales to determine the relative abundance of beluga whale vocalizations within the proposed deployment areas. Hydroacoustic data collected during the Project were used to characterize the ambient acoustic environment of the project site pre-deployment to inform the

  11. Monitoring of health care personnel employee and occupational health immunization program practices in the United States.

    Science.gov (United States)

    Carrico, Ruth M; Sorrells, Nikka; Westhusing, Kelly; Wiemken, Timothy

    2014-01-01

    Recent studies have identified concerns with various elements of health care personnel immunization programs, including the handling and management of the vaccine. The purpose of this study was to assess monitoring processes that support evaluation of the care of vaccines in health care settings. An 11-question survey instrument was developed for use in scripted telephone surveys. State health departments in all 50 states in the United States and the District of Columbia were the target audience for the surveys. Data from a total of 47 states were obtained and analyzed. No states reported an existing monitoring process for evaluation of health care personnel immunization programs in their states. Our assessment indicates that vaccine evaluation processes for health care facilities are rare to nonexistent in the United States. Identifying existing practice gaps and resultant opportunities for improvements may be an important safety initiative that protects patients and health care personnel. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  12. Remote monitoring technical review for light water reactors (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Park, Seung Sik; Yoon, Wan Ki; Na, Won Woo; Kwack, Eun Ho [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-10-01

    The IAEA has been conducting a field trial of a Remote Monitoring System (RMS) at the spent fuel storage, Younggwang 3 nuclear power plant. The system installation plan was initiated after the agreement in the 7th ROK-IAEA safeguards Implementation Review Meeting that was held in Soul, 1998. It describes that IAEA and Korea proceed RM tasks Implementation of RMS at LWRs in the ROK for field trials. The project of RMS is conducting through 3 stages with timing. RMS has been installed for the Phase I of field trial, one of two stages at Younggwang Unit 3 in October 1998. The RMS consists of video systems and a seal at the spent fuel pond area. This report provides a description of the monitoring system and its functions focusing on several technical points of the installation and its 6 month operation at Younggwang Unit 3. Subjects are selected and analyzed in the three chapters, IAEA safeguards policy on Remote Monitoring, the technology, and field test experiences. 8 refs., 12 figs., 12 tabs. (Author)

  13. Augmented fish health monitoring

    International Nuclear Information System (INIS)

    Michak, P.; Rogers, R.; Amos, K.

    1991-05-01

    The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Historically, all agencies involved with fish health in the Columbia Basin were conducting various levels of fish health monitoring, pathogen screening and collection. The goals of this project were; to identify, develop and implement a standardized level of fish health methodologies, develop a common data collection and reporting format in the area of artificial production, evaluate and monitor water quality, improve communications between agencies and provide annual evaluation of fish health information for production of healthier smolts. This completion report will contain a project evaluation, review of the goals of the project, evaluation of the specific fish health analyses, an overview of highlights of the project and concluding remarks. 8 refs., 1 fig., 4 tabs

  14. The Epimed Monitor ICU Database®: a cloud-based national registry for adult intensive care unit patients in Brazil.

    Science.gov (United States)

    Zampieri, Fernando Godinho; Soares, Márcio; Borges, Lunna Perdigão; Salluh, Jorge Ibrain Figueira; Ranzani, Otávio Tavares

    2017-01-01

    To describe the Epimed Monitor Database®, a Brazilian intensive care unit quality improvement database. We described the Epimed Monitor® Database, including its structure and core data. We presented aggregated informative data from intensive care unit admissions from 2010 to 2016 using descriptive statistics. We also described the expansion and growth of the database along with the geographical distribution of participating units in Brazil. The core data from the database includes demographic, administrative and physiological parameters, as well as specific report forms used to gather detailed data regarding the use of intensive care unit resources, infectious episodes, adverse events and checklists for adherence to best clinical practices. As of the end of 2016, 598 adult intensive care units in 318 hospitals totaling 8,160 intensive care unit beds were participating in the database. Most units were located at private hospitals in the southeastern region of the country. The number of yearly admissions rose during this period and included a predominance of medical admissions. The proportion of admissions due to cardiovascular disease declined, while admissions due to sepsis or infections became more common. Illness severity (Simplified Acute Physiology Score - SAPS 3 - 62 points), patient age (mean = 62 years) and hospital mortality (approximately 17%) remained reasonably stable during this time period. A large private database of critically ill patients is feasible and may provide relevant nationwide epidemiological data for quality improvement and benchmarking purposes among the participating intensive care units. This database is useful not only for administrative reasons but also for the improvement of daily care by facilitating the adoption of best practices and use for clinical research.

  15. Recommended methods for range-wide monitoring of prairie dogs in the United States

    Science.gov (United States)

    McDonald, Lyman L.; Stanley, Thomas R.; Otis, David L.; Biggins, Dean E.; Stevens, Patricia D.; Koprowski, John L.; Ballard, Warren

    2011-01-01

    One of the greatest challenges for conserving grassland, prairie scrub, and shrub-steppe ecosystems is maintaining prairie dog populations across the landscape. Of the four species of prairie dogs found in the United States, the Utah prairie dog (Cynomys parvidens) is listed under the Endangered Species Act (ESA) as threatened, the Gunnison's prairie dog (C. gunnisoni) is a candidate for listing in a portion of its range, and the black-tailed prairie dog (C. ludovicianus) and white-tailed prairie dog (C. leucurus) have each been petitioned for listing at least once in recent history. Although the U.S. Fish and Wildlife Service (USFWS) determined listing is not warranted for either the black-tailed prairie dog or white-tailed prairie dog, the petitions and associated reviews demonstrated the need for the States to monitor and manage for self-sustaining populations. In response to these findings, a multi-State conservation effort was initiated for the nonlisted species which included the following proposed actions: (1) completing an assessment of each prairie dog species in each State, (2) developing a range-wide monitoring protocol for each species using a statistically valid sampling procedure that would allow comparable analyses across States, and (3) monitoring prairie dog status every 3-5 years depending upon the species. To date, each State has completed an assessment and currently is monitoring prairie dog status; however, for some species, the inconsistency in survey methodology has made it difficult to compare data year-to-year or State-to-State. At the Prairie Dog Conservation Team meeting held in November 2008, there was discussion regarding the use of different methods to survey prairie dogs. A recommendation from this meeting was to convene a panel in a workshop-type forum and have the panel review the different methods being used and provide recommendations for range-wide monitoring protocols for each species of prairie dog. Consequently, the Western

  16. Development of Product Availability Monitoring System In Production Unit In Automotive Component Industry

    Science.gov (United States)

    Hartono, Rachmad; Raharno, Sri; Yuwana Martawirya, Yatna; Arthaya, Bagus

    2018-03-01

    This paper described a methodology to monitor the availability of products in a production unit in the automotive component industry. Automotive components made are automotive components made through sheet metal working. Raw material coming into production unit in the form of pieces of plates that have a certain size. Raw materials that come stored in the warehouse. Data of raw each material in the warehouse are recorded and stored in a data base system. The material will then undergo several production processes in the production unit. When the material is taken from the warehouse, material data are also recorded and stored in a data base. The data recorded are the amount of material, material type, and date when the material is out of the warehouse. The material coming out of the warehouse is labeled with information related to the production processes that the material must pass. Material out of the warehouse is a product will be made. The products have been completed, are stored in the warehouse products. When the product is entered into the product warehouse, product data is also recorded by scanning the barcode contained on the label. By recording the condition of the product at each stage of production, we can know the availability of the product in a production unit in the form of a raw material, the product being processed and the finished product.

  17. Temelin safety monitor

    International Nuclear Information System (INIS)

    Mlady, O.

    2000-01-01

    Temelin NPP is a WWER-1000/320 two unit plant under construction, originally designed according to the standards of the former Soviet Union. After a series of reviews in the 80s, a decision was taken to upgrade the design of Temelin, including the supply of fuel and instrumentation and instrumentation and control system (I and C). Details on the current design and other related safety matters were presented to the nuclear community in a meeting organized by the IAEA in November 1994. Based upon recommendations of IAEA OSART missions, post TMI requirements and Temelin Risk Audit recommendations it was decided to perform a Probabilistic Safety Assessment within the Temelin PSA Project. The general purpose of this project was to perform systematic examination of the Temelin Unit 1 NPP for severe accident vulnerabilities by performance of a Level 1 and 2 PSA study. In addition to the completion of Temelin documented living PSA model, the decision was to develop and implement a PSA based software tool able to analyze real and scheduled plant conditions for determining the risk impact of plant configurations and on-line maintenance activities. This paper provides an overview of the key features of the Temelin Safety Monitor, describes its development activities and its current status and intended use at Temelin NPP for PSA applications. (author)

  18. Online Monitoring of Concrete Structures in Nuclear Power Plants: Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Mahadevan, Sankaran [Idaho National Lab. (INL), Idaho Falls, ID (United States); Cai, Guowei [Idaho National Lab. (INL), Idaho Falls, ID (United States); Agarwal, Vivek [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-03-01

    The existing fleet of nuclear power plants in the United States have initial operating licenses of 40 years, and many of these plants have applied for and received license extensions. As plant structures, systems, and components age, their useful life—considering both structural integrity and performance—is reduced as a result of deterioration of the materials. Assessment and management of aging concrete structures in nuclear plants require a more systematic approach than simple reliance on existing code-based design margins of safety. Structural health monitoring is required to produce actionable information regarding structural integrity that supports operational and maintenance decisions. The online monitoring of concrete structures project conducted under the Advanced Instrumentation, Information, and Control Technologies Pathway of the Light Water Reactor Sustainability program at Idaho National Laboratory is seeking to develop and demonstrate capabilities for concrete structures health monitoring. Through this research project, several national laboratories and Vanderbilt University propose to develop a framework of research activities for the health monitoring of nuclear power plant concrete structures that includes the integration of four elements—damage modeling, monitoring, data analytics, and uncertainty quantification. This report briefly discusses activities in this project during October-December, 2014. The most significant activity during this period was the organizing of a two-day workshop on research needs in online monitoring of concrete structures, hosted by Vanderbilt University in November 2014. Thirty invitees from academia, industry and government participated in the workshop. The presentations and discussions at the workshop surveyed current activities related to concrete structures deterioration modeling and monitoring, and identified the challenges, knowledge gaps, and opportunities for advancing the state of the art; these

  19. Offsite environmental monitoring report: Radiation monitoring around United States nuclear test areas

    International Nuclear Information System (INIS)

    1990-01-01

    This report describes the Offsite Radiation Safety Program conducted during 1990 by the Environmental Protection Agency's (EPA's) Environmental Monitoring Systems Laboratory -- Las Vegas. This laboratory operates an environmental radiation monitoring program in the region surrounding the Nevada Test Site (NTS) and at former test sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The surveillance program is designed to measure levels and trends of radioactivity, if present, in the environment surrounding testing areas to ascertain whether current radiation levels and associated doses to the general public are in compliance with existing radiation protection standards. The surveillance program additionally has the responsibility to take action to protect the health and well being of the public in the event of any accidental release of radioactive contaminants. Offsite levels of radiation and radioactivity are assessed by sampling milk, water, and air; by deploying thermoluminescent dosimeters (TLDs) and using pressurized ion chambers (PICs); and by biological monitoring of animals, food crops, and humans. Personnel with mobile monitoring equipment are placed in areas downwind from the test site prior to each nuclear weapons test to implement protective actions, provide immediate radiation monitoring, and obtain environmental samples rapidly after any occurrence of radioactivity release

  20. Development of expert system for fuel monitoring and analysis in WWER-1000 units

    International Nuclear Information System (INIS)

    Likhanskii, V.; Evdokimov, I.; Sorokin, A.; Kanukova, V.; Zborovskii, V.; Aliev, T.; Sokolov, N.; Shishkin, A.

    2011-01-01

    At present, an expert system (software package) for fuel monitoring in WWER units is under development in Russia. It comprises several modules which cover analysis of coolant activity, detection of failures and estimation of failure parameters, predictions of activity level and some aspects of PCI analysis. This paper outlines the current version of the fuel monitoring system, its basic features and user interface. Advances in development of computer modules for PCI analysis are reported. At present two levels of PCI analysis are used. The first is estimation of probability for pellets to get in contact with cladding in fuel rods. Estimations are made with taking into account specifications and tolerances for fuel fabrication as well as fuel operation conditions. The second level of PCI analysis implies a simplified approach for on-line calculations of stresses in cladding depending on power ramping rates. The model for PCI calculations and its application within the computer system is demonstrated. (authors)

  1. Biodiversity monitoring in Europe: the EU FP7 EBONE project. European biodiversity observation NEtwork

    CSIR Research Space (South Africa)

    Lück-Vogel, Melanie

    2008-09-01

    Full Text Available submission Presentation Poster presentation A) Title Biodiversity Monitoring in Europe: The EU FP7 EBONE project European Biodiversity Observation NEtwork B) Short title EBONE - European Biodiversity Observation NEtwork C) Author(s) Vogel, M. (1... stream_source_info Vogel_2008.pdf.txt stream_content_type text/plain stream_size 3055 Content-Encoding UTF-8 stream_name Vogel_2008.pdf.txt Content-Type text/plain; charset=UTF-8 BIOTA AFRICA Congress 2008 Abstract...

  2. Status of initial phase of site-specific seismic monitoring: Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Rohay, A.C.

    1981-01-01

    This report presents the status of the initial phase of site-specific seismic monitoring work conducted under the Basalt Waste Isolation Project. This work is currently organized under two main elements: (1) a portable array; and (2) a baseline data collection array. Progress toward the development of each array is discussed along with an interpretation of preliminary data obtained from the test of a borehole seismometer at potential repository depths. The text is supplemented by nine figures and one table. 9 figs., 1 tab

  3. THE LICK AGN MONITORING PROJECT: PHOTOMETRIC LIGHT CURVES AND OPTICAL VARIABILITY CHARACTERISTICS

    International Nuclear Information System (INIS)

    Walsh, Jonelle L.; Bentz, Misty C.; Barth, Aaron J.; Minezaki, Takeo; Sakata, Yu; Yoshii, Yuzuru; Baliber, Nairn; Bennert, Vardha Nicola; Street, Rachel A.; Treu, Tommaso; Li Weidong; Filippenko, Alexei V.; Stern, Daniel; Brown, Timothy M.; Canalizo, Gabriela; Gates, Elinor L.; Greene, Jenny E.; Malkan, Matthew A.; Woo, Jong-Hak

    2009-01-01

    The Lick AGN Monitoring Project targeted 13 nearby Seyfert 1 galaxies with the intent of measuring the masses of their central black holes using reverberation mapping. The sample includes 12 galaxies selected to have black holes with masses roughly in the range 10 6 -10 7 M sun , as well as the well-studied active galactic nucleus (AGN) NGC 5548. In conjunction with a spectroscopic monitoring campaign, we obtained broadband B and V images on most nights from 2008 February through 2008 May. The imaging observations were carried out by four telescopes: the 0.76 m Katzman Automatic Imaging Telescope, the 2 m Multicolor Active Galactic Nuclei Monitoring telescope, the Palomar 60 inch (1.5 m) telescope, and the 0.80 m Tenagra II telescope. Having well-sampled light curves over the course of a few months is useful for obtaining the broad-line reverberation lag and black hole mass, and also allows us to examine the characteristics of the continuum variability. In this paper, we discuss the observational methods and the photometric measurements, and present the AGN continuum light curves. We measure various variability characteristics of each of the light curves. We do not detect any evidence for a time lag between the B- and V-band variations, and we do not find significant color variations for the AGNs in our sample.

  4. Improved Marine Waters Monitoring

    Science.gov (United States)

    Palazov, Atanas; Yakushev, Evgeniy; Milkova, Tanya; Slabakova, Violeta; Hristova, Ognyana

    2017-04-01

    IMAMO - Improved Marine Waters Monitoring is a project under the Programme BG02: Improved monitoring of marine waters, managed by Bulgarian Ministry of environment and waters and co-financed by the Financial Mechanism of the European Economic Area (EEA FM) 2009 - 2014. Project Beneficiary is the Institute of oceanology - Bulgarian Academy of Sciences with two partners: Norwegian Institute for Water Research and Bulgarian Black Sea Basin Directorate. The Project aims to improve the monitoring capacity and expertise of the organizations responsible for marine waters monitoring in Bulgaria to meet the requirements of EU and national legislation. The main outcomes are to fill the gaps in information from the Initial assessment of the marine environment and to collect data to assess the current ecological status of marine waters including information as a base for revision of ecological targets established by the monitoring programme prepared in 2014 under Art. 11 of MSFD. Project activities are targeted to ensure data for Descriptors 5, 8 and 9. IMAMO aims to increase the institutional capacity of the Bulgarian partners related to the monitoring and assessment of the Black Sea environment. The main outputs are: establishment of real time monitoring and set up of accredited laboratory facilities for marine waters and sediments chemical analysis to ensure the ability of Bulgarian partners to monitor progress of subsequent measures undertaken.

  5. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Data Report

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barber, David S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Betsill, J. David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Littlefield, Adriane C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Mohagheghi, Amir H. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Shanks, Sonoya T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Yuldashev, Bekhzad [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Saalikhbaev, Umar [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Radyuk, Raisa [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Djuraev, Akram [Tajik Academy of Sciences, Dushanbe (Tajikistan); Djuraev, Anwar [Tajik Academy of Sciences, Dushanbe (Tajikistan); Vasilev, Ivan [Inst. of Physics, Bishkek (Kyrgyzstan); Tolongutov, Bajgabyl [Inst. of Physics, Bishkek (Kyrgyzstan); Valentina, Alekhina [Inst. of Physics, Bishkek (Kyrgyzstan); Solodukhin, Vladimir [Inst. of Nuclear Physics, Almaty (Kazakhstan); Pozniak, Victor [Inst. of Nuclear Physics, Almaty (Kazakhstan)

    2003-04-01

    The Navruz Project is a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan, and facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. The Project also collects data on basic water quality parameters. Data obtained in this project are shared among all participating countries and the public through a world-wide web site (http://www.cmc.sandia.org/Central/centralasia.html), and are available for use in further studies and in regional transboundary water resource management efforts. This report includes graphs showing selected data from the Fall 2000 and Spring 2001 sampling seasons. These data include all parameters grouped into six regions, including main rivers and some tributaries in the Amu Darya and Syr Darya river systems. This report also assembles all data (in tabular form) generated by the project from Fall 2000 through Fall 2001. This report comes as the second part of a planned three-part reporting process. The first report is the Sampling and Analysis Plan and Operational Manual, SAND 2002-0484. This is the second report.

  6. 18 CFR 806.30 - Monitoring.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Monitoring. 806.30... APPROVAL OF PROJECTS Terms and Conditions of Approval § 806.30 Monitoring. The Commission, as part of the project review, shall evaluate the proposed methodology for monitoring consumptive uses, water withdrawals...

  7. 43 CFR 418.15 - Operations monitoring.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Operations monitoring. 418.15 Section 418... THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Monitoring Diversions § 418.15 Operations monitoring. (a) The Bureau will work with the District to monitor Project...

  8. Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1

    International Nuclear Information System (INIS)

    Huber, T.E.

    1995-01-01

    This document consists of an analysis of the MICON system upgrade. This project shall install a Micon Co. distributed process monitor and control system with Sparc Sun workstation operator interfaces. The Sparc workstations are housed in consoles custom designed to human factors specifications. The distributed control system (DCS) shall have the installed capacity to monitor and control all related instruments and equipment presently connected to the panels in the PFP Power Control Room 321A as listed in the input/output list. This also includes all devices monitored and controlled by the 2736-ZB Allen Bradley programmable logic controller. The system has since assumed the control and monitoring responsibilities for Projects B- 680H ''Low Level Waste Treatment Facility'' and C-031H ''PFP Liquid Effluent Facilities''. Part of the new en's change area in Building 234-5ZA, Room 712, has been remodeled to house two consoles and one supervisor console. Local control units containing the microprocontrollers and the input/output interface circuit boards shall be wired to the instrumentation and controlled equipment. These units communicate with the Sparc workstations via a redundant data communications highway and shall be strategic, throughout the PFP facility. The DCS has already been purchased from Micon Co., located in Houston Texas, presently on site

  9. General guidelines for the Assessment of Internal Dose from Monitoring Data (Project IDEAS)

    International Nuclear Information System (INIS)

    Doerfel, H.; Andrasi, A.; Bailey, M.; Blanchardon, E.; Berkovski, V.; Castellani, C. M.; Hurtgen, C.; Jourdain, J. R.; LeGuen, B.; Puncher, M.

    2004-01-01

    In recent major international intercomparison exercises on intake and internal dose assessments from monitoring data the results calculated by different participants varied significantly. This was mainly due to the broad variety of methods and assumptions applied in the assessment procedure. Based on these experiences the need for harmonisation of the procedures has been formulated within an EU research project under the 5th Framework Programme. The aim of the project, IDEAS, is to develop general guidelines for standardising assessments of intakes and internal doses. The IDEAS project started in October 2001 and will end in March 2005. Eight institutions from seven European countries are participating. Inputs from internal dosimetry professionals from across Europe are also being used to ensure a broad consensus in the outcome of the project. The IDEAS project is closely related to some goals of the work of Committee 2 of the ICRP and since 2003 there has been close cooperation between the two groups. To ensure that the guidelines are applicable to a wide range of practical situations, the first step has been to compile a database of well-documented cases of internal contamination. In parallel, an improved version of an existing software package has been developed and distributed to the partners for further use. A large number of cases from the database have been evaluated independently by partners in the project using the same software and the results have been reviewed. Based on these evaluations guidelines are being drafted and will be discussed with dosimetry professionals from around the world by means of a virtual workshop on the Internet early in 2004. The guidelines will be revised and refined on the basis of the experiences and discussions of this virtual workshop and the outcome of an intercomparison exercise organised as part of the project. This will be open to all internal dosimetry professionals. (Author) 10 refs

  10. Improving Perinatal Care in the Rural Regions Worldwide by Wireless Enabled Antepartum Fetal Monitoring: A Demonstration Project

    Directory of Open Access Journals (Sweden)

    Roberto Tapia-Conyer

    2015-01-01

    Full Text Available Background. Fetal and neonatal morbidity and mortality are significant problems in developing countries; remote maternal-fetal monitoring offers promise in addressing this challenge. The Gary and Mary West Health Institute and the Instituto Carlos Slim de la Salud conducted a demonstration project of wirelessly enabled antepartum maternal-fetal monitoring in the state of Yucatán, Mexico, to assess whether there were any fundamental barriers preventing deployment and use. Methods. Following informed consent, high-risk pregnant women at 27–29 weeks of gestation at the Chemax primary clinic participated in remote maternal-fetal monitoring. Study participants were randomized to receive either prototype wireless monitoring or standard-of-care. Feasibility was evaluated by assessing technical aspects of performance, adherence to monitoring appointments, and response to recommendations. Results. Data were collected from 153 high-risk pregnant indigenous Mayan women receiving either remote monitoring (n=74 or usual standard-of-care (n=79. Remote monitoring resulted in markedly increased adherence (94.3% versus 45.1%. Health outcomes were not statistically different in the two groups. Conclusions. Remote maternal-fetal monitoring is feasible in resource-constrained environments and can improve maternal compliance for monitoring sessions. Improvement in maternal-fetal health outcomes requires integration of such technology into sociocultural context and addressing logistical challenges of access to appropriate emergency services.

  11. Improving Perinatal Care in the Rural Regions Worldwide by Wireless Enabled Antepartum Fetal Monitoring: A Demonstration Project

    Science.gov (United States)

    Tapia-Conyer, Roberto; Lyford, Shelley; Saucedo, Rodrigo; Casale, Michael; Gallardo, Hector; Becerra, Karen; Mack, Jonathan; Mujica, Ricardo; Estrada, Daniel; Sanchez, Antonio; Sabido, Ramon; Meier, Carlos; Smith, Joseph

    2015-01-01

    Background. Fetal and neonatal morbidity and mortality are significant problems in developing countries; remote maternal-fetal monitoring offers promise in addressing this challenge. The Gary and Mary West Health Institute and the Instituto Carlos Slim de la Salud conducted a demonstration project of wirelessly enabled antepartum maternal-fetal monitoring in the state of Yucatán, Mexico, to assess whether there were any fundamental barriers preventing deployment and use. Methods. Following informed consent, high-risk pregnant women at 27–29 weeks of gestation at the Chemax primary clinic participated in remote maternal-fetal monitoring. Study participants were randomized to receive either prototype wireless monitoring or standard-of-care. Feasibility was evaluated by assessing technical aspects of performance, adherence to monitoring appointments, and response to recommendations. Results. Data were collected from 153 high-risk pregnant indigenous Mayan women receiving either remote monitoring (n = 74) or usual standard-of-care (n = 79). Remote monitoring resulted in markedly increased adherence (94.3% versus 45.1%). Health outcomes were not statistically different in the two groups. Conclusions. Remote maternal-fetal monitoring is feasible in resource-constrained environments and can improve maternal compliance for monitoring sessions. Improvement in maternal-fetal health outcomes requires integration of such technology into sociocultural context and addressing logistical challenges of access to appropriate emergency services. PMID:25691900

  12. Effects of recent energy system changes on CO2 projections for the United States.

    Science.gov (United States)

    Lenox, Carol S; Loughlin, Daniel H

    2017-09-21

    Recent projections of future United States carbon dioxide (CO 2 ) emissions are considerably lower than projections made just a decade ago. A myriad of factors have contributed to lower forecasts, including reductions in end-use energy service demands, improvements in energy efficiency, and technological innovations. Policies that have encouraged these changes include renewable portfolio standards, corporate vehicle efficiency standards, smart growth initiatives, revisions to building codes, and air and climate regulations. Understanding the effects of these and other factors can be advantageous as society evaluates opportunities for achieving additional CO 2 reductions. Energy system models provide a means to develop such insights. In this analysis, the MARKet ALlocation (MARKAL) model was applied to estimate the relative effects of various energy system changes that have happened since the year 2005 on CO 2 projections for the year 2025. The results indicate that transformations in the transportation and buildings sectors have played major roles in lowering projections. Particularly influential changes include improved vehicle efficiencies, reductions in projected travel demand, reductions in miscellaneous commercial electricity loads, and higher efficiency lighting. Electric sector changes have also contributed significantly to the lowered forecasts, driven by demand reductions, renewable portfolio standards, and air quality regulations.

  13. Integrated disposal Facility Sagebrush Habitat Mitigation Project: FY2007 Compensation Area Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2007-09-01

    This report summarizes the first year survival of sagebrush seedlings planted as compensatory mitigation for the Integrated Disposal Facility Project. Approximately 42,600 bare root seedlings and 26,000 pluglings were planted at a mitigation site along Army Loop Road in February 2007. Initial baseline monitoring occurred in March 2007, and first summer survival was assessed in September 2007. Overall survival was 19%, with bare root survival being marginally better than pluglings (21% versus 14%). Likely major factors contributing to low survival were late season planting and insufficient soil moisture during seedling establishment.

  14. Tools for automated acoustic monitoring within the R package monitoR

    DEFF Research Database (Denmark)

    Katz, Jonathan; Hafner, Sasha D.; Donovan, Therese

    2016-01-01

    The R package monitoR contains tools for managing an acoustic-monitoring program including survey metadata, template creation and manipulation, automated detection and results management. These tools are scalable for use with small projects as well as larger long-term projects and those...... with expansive spatial extents. Here, we describe typical workflow when using the tools in monitoR. Typical workflow utilizes a generic sequence of functions, with the option for either binary point matching or spectrogram cross-correlation detectors....

  15. Tools for automated acoustic monitoring within the R package monitoR

    Science.gov (United States)

    Katz, Jonathan; Hafner, Sasha D.; Donovan, Therese

    2016-01-01

    The R package monitoR contains tools for managing an acoustic-monitoring program including survey metadata, template creation and manipulation, automated detection and results management. These tools are scalable for use with small projects as well as larger long-term projects and those with expansive spatial extents. Here, we describe typical workflow when using the tools in monitoR. Typical workflow utilizes a generic sequence of functions, with the option for either binary point matching or spectrogram cross-correlation detectors.

  16. Nuclear reactor instrumentation power monitor

    International Nuclear Information System (INIS)

    Suzuki, Shigeru.

    1989-01-01

    The present invention concerns a nuclear reactor instrumentation power monitor that can be used in, for example, BWR type nuclear power plants. Signals from multi-channel detectors disposed on field units are converted respectively by LPRM signal circuits. Then, the converted signals are further converted by a multiplexer into digital signals and transmitted as serial data to a central monitor unit. The thus transmitted serial data are converted into parallel data in the signal processing section of the central monitor unit. Then, LPRM signals are taken out from each of channel detectors to conduct mathematical processing such as trip judgment or averaging. Accordingly, the field unit and the central monitor unit can be connected by way of only one data transmission cable thereby enabling to reduce the number of cables. Further, since the data are transmitted on digital form, it less undergoes effect of noises. (I.S.)

  17. Design of an integrated sensor platform for vital sign monitoring of newborn infants at neonatal intensive care unit

    NARCIS (Netherlands)

    Chen, W.; Bambang Oetomo, S.; Feijs, L.M.G.; Bouwstra, S.; Ayoola, Idowu; Dols, S.A.E.

    2010-01-01

    Continuous health status monitoring and advances in medical treatments have resulted in a significant increase of survival rate in critically ill infants admitted into Neonatal Intensive Care Units (NICUs). The quality of life and long-term health prospects of the neonates depend increasingly on the

  18. Groundwater-quality data in the North San Francisco Bay Shallow Aquifer study unit, 2012: results from the California GAMA Program

    Science.gov (United States)

    Bennett, George L.; Fram, Miranda S.

    2014-01-01

    Groundwater quality in the 1,850-square-mile North San Francisco Bay Shallow Aquifer (NSF-SA) study unit was investigated by the U.S. Geological Survey (USGS) from April to August 2012, as part of the California State Water Resources Control Board (SWRCB) Groundwater Ambient Monitoring and Assessment (GAMA) Program’s Priority Basin Project (PBP). The GAMA-PBP was developed in response to the California Groundwater Quality Monitoring Act of 2001 and is being conducted in collaboration with the SWRCB and Lawrence Livermore National Laboratory (LLNL). The NSF-SA study unit was the first study unit to be sampled as part of the second phase of the GAMA-PBP, which focuses on the shallow aquifer system.

  19. Modernization project of the rod control system and in-core instrumentation system for 34 units of the 900 MW French EDF fleet

    International Nuclear Information System (INIS)

    Tavolara, Ivan; Verburgh, Pierre; Menager, Antoine

    2010-01-01

    Rolls-Royce and Cegelec, in partnership, carry out a unique and considerable modernisation project of two Instrumentation and Control (I and C) systems for the entire 900 MWe fleet of Electricite De France (EDF). Both rod control (RCS) and reactor in-core measurement (RIC) systems are to be modernised in the frame of the third ten-year renovation of all 34 reactor units over 9 power plants. The RCS contributes to the control of nuclear power by actuating control rod drive mechanisms that allow insertion or withdrawal of control rods. The RCS has also monitoring functions such as controlling the actual rods' position as well as the functional consistency between commands and actual positions. The RIC system measures in-core neutron flux, providing useful information to the control room as well as to the reactor unit computer for further processing. The renovated systems shall replace the existing ageing analog technology by modern digital technology based on PLC (Programmable Logic Controllers) and FPGA (Field-Programmable Gate Array) in the case of power subassemblies of RCS. Both systems rely for certain functions on a common network linking the RCS and RIC networks, improving operations and maintenance thanks to a powerful Man Machine Interface at the different locations of the systems with an extensive suite of tools and diagnostic menus. The project whose design phase started in July 2006 is now in its deployment phase after the successful site implementation of both systems at the first units of Tricastin and Fessenheim power plants, respectively in August 2009 and February 2010. The deployment shall continue with the other 32 units until 2020. Rolls-Royce has a broad range of civil nuclear expertise, including work related to licensing and safety reviews, engineering design, supply chain management, manufacturing, installation and commissioning of the nuclear island systems and equipment, as well as operational management through life support. Cegelec, with

  20. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    International Nuclear Information System (INIS)

    Passell, Howard D.; Barber, David S.; Betsill, J. David; Littlfield, Adriane C.; Mohagheghi, Amir H.; Shanks, Sonoya T.; Yuldashev, Bekhzad; Salikhbaev, Umar; Radyuk, Raisa; Djuraev, Akram; Djuraev, Amwar; Vasilev, Ivan; Tolongutov, Bajgabyl; Valentina, Alekhina; Solodukhin, Vladimir; Pozniak, Victor

    2002-01-01

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

  1. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard D.; Barber, David S.; Betsill, J. David; Littlfield, Adriane C.; Mohagheghi, Amir H.; Shanks, Sonoya T.; Yuldashev, Bekhzad; Salikhbaev, Umar; Radyuk, Raisa; Djuraev, Akram; Djuraev, Amwar; Vasilev, Ivan; Tolongutov, Bajgabyl; Valentina, Alekhina; Solodukhin, Vladimir; Pozniak, Victor

    2002-04-02

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

  2. Self-monitoring and psychoeducation in bipolar patients with a smart-phone application (SIMPLe) project: design, development and studies protocols

    OpenAIRE

    Hidalgo-Mazzei, Diego; Mateu, Ainoa; Reinares, Mar?a; Undurraga, Juan; Bonn?n, Caterina del Mar; S?nchez-Moreno, Jos?; Vieta, Eduard; Colom, Francesc

    2015-01-01

    Background: New technologies have recently been used for monitoring signs and symptoms of mental health illnesses and particularly have been tested to improve the outcomes in bipolar disorders. Web-based psychoeducational programs for bipolar disorders have also been implemented, yet to our knowledge, none of them have integrated both approaches in one single intervention. The aim of this project is to develop and validate a smartphone application to monitor symptoms and signs and empower the...

  3. Beam position monitors for the high brightness lattice

    International Nuclear Information System (INIS)

    Ring, T.

    1985-06-01

    Engineering developments associated with the high brightness lattice and the projected change in machine operating parameters will inherently affect the diagnostics systems and devices installed at present in the storage ring. This is particularly true of the beam position monitoring (BPI) system. The new sixteen unit cell lattice with its higher betatron tune values and the limited space available in the redesigned machine straights for fitting standard BPI vessels forces a fundamental re-evaluation of the beam position monitor system. The design aims for the new system are based on accepting the space limitations imposed while still providing the monitor points required to give good radial and vertical closed orbit plots. The locations of BPI's in the redesigned machine straights is illustrated. A description of the new BPI assemblies and their calibration is given. The BPI's use capacitance button type pick-ups; their response is described. (U.K.)

  4. Business Intelligence Support For Project Management

    OpenAIRE

    Muntean, Mihaela; Cabau, Liviu Gabiel

    2013-01-01

    With respect to the project management framework, a project live cycle consists of phases like: initiation, planning, execution, monitoring & control and closing. Monitoring implies measuring the progress and performance of the project during its execution and communicating the status. Actual performance is compared with the planned one. Therefore, a minimal set of key performance indicators will be proposed. Monitoring the schedule progress, the project budget and the scope will be possible....

  5. 1988 Monitoring Activities Review (MAR) of the environmental monitoring program

    International Nuclear Information System (INIS)

    1989-03-01

    The EGandG Idaho Environmental Monitoring (EM) Unit is responsible for coordinating and conducting environmental measurements of radioactive and hazardous contaminants around facilities operated by EGandG Idaho. The EM Unit has several broad program objectives, which include complying with regulatory standards and developing a basis for estimating future impacts of operations at EGandG Idaho facilities. To improve program planning and to provide bases for technical improvement of the monitoring program, the EGandG Environmental Monitoring organization has regularly used the Monitoring Activities Review (MAR) process since 1982. Each MAR is conducted by a committee of individuals selected for their experience in the various types of monitoring performed by the EM organization. Previous MAR studies have focused on procedures for all currently monitored media except biota. Biotic monitoring was initiated following the last MAR. This report focuses on all currently monitored media, and includes the first review of biotic monitoring. The review of biotic monitoring has been conducted at a level of detail consistent with initial MAR reports for other parts of the Waste Management Program Facilities Environmental Monitoring Program. The review of the biotic monitoring activities is presented in Section 5.5 of this report. 21 refs., 7 figs., 4 tabs

  6. User's guide to a data base of current environmental monitoring projects in the US-Canadian transboundary region

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, M.Y.; Defferding, J.; Chapman, E.G.; Bettinson, M.D.; Glantz, C.S.

    1987-11-01

    This document describes how to use a data base of current transboundary region environmental monitoring projects. The data base was prepared from data provided by Glantz et al. (1986) and Concord Scientific Corporation (1985), and contains information on 226 projects with monitoring stations located within 400 km (250 mi) of the US-Canadian border. The data base is designed for use with the dBASE III PLUS data management systems on IBM-compatible personal computers. Data-base searches are best accomplished using an accompanying command file called RETRIEVE or the dBASE command LIST. The user must carefully select the substrings on which the search is to be based. Example search requests and subsequent output are presented to illustrate substring selections and applications of the data base. 4 refs., 15 figs., 4 tabs.

  7. Projecting the epidemiological effect, cost-effectiveness and transmission of HIV drug resistance in Vietnam associated with viral load monitoring strategies.

    Science.gov (United States)

    Pham, Quang Duy; Wilson, David P; Nguyen, Thuong Vu; Do, Nhan Thi; Truong, Lien Xuan; Nguyen, Long Thanh; Zhang, Lei

    2016-05-01

    The objective of this study was to investigate the potential epidemiological impact of viral load (VL) monitoring and its cost-effectiveness in Vietnam, where transmitted HIV drug resistance (TDR) prevalence has increased from HIV drug-resistance tests. We assessed the cost per disability-adjusted life year (DALY) averted for each scenario. Projecting expected ART scale-up levels, to approximately double the number of people on ART by 2030, will lead to an estimated 18 510 cases (95% CI: 9120-34 600 cases) of TDR and 55 180 cases (95% CI: 40 540-65 900 cases) of acquired drug resistance (ADR) in the absence of VL monitoring. This projection corresponds to a TDR prevalence of 16% (95% CI: 11%-24%) and ADR of 18% (95% CI: 15%-20%). Annual or biennial VL monitoring with 30% coverage is expected to relieve 12%-31% of TDR (2260-5860 cases), 25%-59% of ADR (9620-22 650 cases), 2%-6% of HIV-related deaths (360-880 cases) and 19 270-51 400 DALYs during 2015-30. The 30% coverage of VL monitoring is estimated to cost US$4848-5154 per DALY averted. The projected additional cost for implementing this strategy is US$105-268 million over 2015-30. Our study suggests that a programmatically achievable 30% coverage of VL monitoring can have considerable benefits for individuals and leads to population health benefits by reducing the overall national burden of HIV drug resistance. It is marginally cost-effective according to common willingness-to-pay thresholds. © The Author 2016. Published by Oxford University Press on behalf of the British Society for Antimicrobial Chemotherapy. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  8. Framework for monitoring the social and economic impacts associated with the construction of the Skagit Nuclear Project in Skagit County, Washington

    International Nuclear Information System (INIS)

    Merwin, D.J.; Greene, M.

    1977-01-01

    The paper discusses an information system which has been developed to monitor the social and economic impacts associated with the construction of twin nuclear reactors in Skagit County, Washington, by Puget Sound Power and Light Company. The monitoring system has been specifically designed to track the social and economic impacts of the Skagit Nuclear Project as they occur

  9. A new device for monitoring moorings

    Digital Repository Service at National Institute of Oceanography (India)

    Namboothiri, E.G.; Krishnakumar, V.

    A new device - Mooring Monitoring Unit (MMU), which consists of an inwater unit and a deck unit has been designed to monitor mooring in situ. This device helps tracing underwater moorings, once its marker buoy is removed either by accident or theft...

  10. MercNet: A national monitoring network to assess responses to changing mercury emissions in the United States

    Science.gov (United States)

    Schmeltz, D.; Evers, D.C.; Driscoll, C.T.; Artz, R.; Cohen, M.; Gay, D.; Haeuber, R.; Krabbenhoft, D.P.; Mason, R.; Morris, K.; Wiener, J.G.

    2011-01-01

    A partnership of federal and state agencies, tribes, industry, and scientists from academic research and environmental organizations is establishing a national, policy-relevant mercury monitoring network, called MercNet, to address key questions concerning changes in anthropogenic mercury emissions and deposition, associated linkages to ecosystem effects, and recovery from mercury contamination. This network would quantify mercury in the atmosphere, land, water, and biota in terrestrial, freshwater, and coastal ecosystems to provide a national scientific capability for evaluating the benefits and effectiveness of emission controls. Program development began with two workshops, convened to establish network goals, to select key indicators for monitoring, to propose a geographic network of monitoring sites, and to design a monitoring plan. MercNet relies strongly on multi-institutional partnerships to secure the capabilities and comprehensive data that are needed to develop, calibrate, and refine predictive mercury models and to guide effective management. Ongoing collaborative efforts include the: (1) development of regional multi-media databases on mercury in the Laurentian Great Lakes, northeastern United States, and eastern Canada; (2) syntheses and reporting of these data for the scientific and policy communities; and (3) evaluation of potential monitoring sites. The MercNet approach could be applied to the development of other monitoring programs, such as emerging efforts to monitor and assess global mercury emission controls. ?? 2011 Springer Science+Business Media, LLC (outside the USA).

  11. Monitoring of operating processes

    International Nuclear Information System (INIS)

    Barry, R.F.

    1981-01-01

    Apparatus is described for monitoring the processes of a nuclear reactor to detect off-normal operation of any process and for testing the monitoring apparatus. The processes are evaluated by response to their paramters, such as temperature, pressure, etc. The apparatus includes a pair of monitoring paths or signal processing units. Each unit includes facilities for receiving on a time-sharing basis, a status binary word made up of digits each indicating the status of a process, whether normal or off-normal, and test-signal binary words simulating the status binary words. The status words and test words are processed in succession during successive cycles. During each cycle, the two units receive the same status word and the same test word. The test words simulate the status words both when they indicate normal operation and when they indicate off-normal operation. Each signal-processing unit includes a pair of memories. Each memory receives a status word or a test word, as the case may be, and converts the received word into a converted status word or a converted test word. The memories of each monitoring unit operate into a non-coincidence which signals non-coincidence of the converted word out of one memory of a signal-processing unit not identical to the converted word of the other memory of the same unit

  12. Multi-project, multi-national, geographically dispersed: Challenges for the Nuclear Renaissance in the United States

    International Nuclear Information System (INIS)

    Mathews, T.A.

    2007-01-01

    The nuclear renaissance in the United States is moving at a rapid pace due to the incentives in the Energy Policy Act of 2005, recognition of the environmental benefits of nuclear energy, and the need for stable, reliable, and diverse sources of energy. The U.S. is looking externally to capitalize on French, German, Japanese, and other worldwide experience. A number of challenges to the resurgence of nuclear power are common worldwide, including project management, workforce and supplier availability and large-project construction management experience. For example, AREVA's new plant project teams are comprised of resources drawn from various U.S. centers of technical expertise and backed up by AREVA's worldwide capabilities. However, the challenge lies in having the information infrastructure in place to integrate that expertise and share information across working groups. In another example, the U.S. regulatory process has changed significantly for the better, but the new streamlined combined license process has not been tested. Reactor vendors and utilities have injected new thinking into the process by pursuing Design Certification, Early Site Permit, and Combined License approval in parallel rather than in series. This paper will discuss these and other challenges to licensing and building new nuclear plants, and the approaches being used by AREVA to lead the Nuclear Renaissance in the United States. (author)

  13. The international project of radiation and hydrochemical investigation and monitoring of general Caspian rivers

    International Nuclear Information System (INIS)

    Passell, H.D.; Barber, D.S.; Kadyrzhanov, K.K; Solodukhin, V.P.; Chernykh, E.E.; Arutyunyan, R.V.; Valyaev, A.N.; Kadik, A.A.; Stepanetts, O.V; Vernadsky, V.I.; Alizade, A.A.; Gutiev, I.S.; Mamedov, R.F.; Nadareishvili, K.S.; Chkhartishvili, A.G.; Tsitskishvili, M.S.; Chubaryan, E. V; Gevorgyan, R.G.; Puskyulyan, K.I.

    2005-01-01

    Full text: The scientific community of six countries (USA, Kazakhstan, Russia, Georgia, Armenia, and Azerbaijan) has developed the ecological project 'Joint International Researches and Creation of the General System of Radiation and Hydro-chemical Monitoring of Rivers of the Caspian Sea Basin.' The purpose of this project is to investigate and characterized contamination by radionuclides and toxic and chemically hazardous elements and create a valid system of radiation and hydro-chemical monitoring of the main river basins of the Caspian region: the Volga, Ural, Emba and Kura. The basins of these rivers cover large parts of Europe and Asia, including parts of Russia, West Kazakhstan and the South Caucasus and including territories of Georgia, Armenia and Azerbaijan. The total area of the basins of these rivers exceeds combined area of such large European states as France, Spain and Germany, and comprises 1631 sq. km. All these rivers are the main life-supporting water arteries for the region's inhabitants, a population that comprises tens of millions of people Also, the outlets of these rivers determine the condition of the aquatic environment of the Caspian Sea. The ecological condition of the aquatic environment of all the rivers of the Caspian Sea is to a great extent due to contamination, the main components of which are anthropogenic radioactive elements, heavy metals and oil products. At present, information about contamination levels of these rivers is not known and is occasionally contradictory. In this connection there is an obvious need of qualified investigation of contamination levels and its character in the basins of these rivers and in creating a common monitoring system to assess the quality of the aquatic environment. The present project is devoted to this matter. 1. The project provides for the following main tasks: 1. Wide-ranging investigation of the level and character of contamination by radionuclides and toxic elements of the river basins

  14. Continuous stroke unit electrocardiographic monitoring versus 24-hour Holter electrocardiography for detection of paroxysmal atrial fibrillation after stroke.

    Science.gov (United States)

    Rizos, Timolaos; Güntner, Janina; Jenetzky, Ekkehart; Marquardt, Lars; Reichardt, Christine; Becker, Rüdiger; Reinhardt, Roland; Hepp, Thomas; Kirchhof, Paulus; Aleynichenko, Elena; Ringleb, Peter; Hacke, Werner; Veltkamp, Roland

    2012-10-01

    Cardioembolism in paroxysmal atrial fibrillation (pxAF) is a frequent cause of ischemic stroke. Sensitive detection of pxAF after stroke is crucial for adequate secondary stroke prevention; the optimal diagnostic modality to detect pxAF on stroke units is unknown. We compared 24-hour Holter electrocardiography (ECG) with continuous stroke unit ECG monitoring (CEM) for pxAF detection. Patients with acute ischemic stroke or transient ischemic attack were prospectively enrolled. After a 12-channel ECG on admission, all patients received 24-hour Holter ECG and CEM. Additionally, ECG monitoring data underwent automated analysis using dedicated software to identify pxAF. Patients with a history of atrial fibrillation or with atrial fibrillation on the admission ECG were excluded. Four hundred ninety-six patients (median age, 69 years; 61.5% male) fulfilled all inclusion criteria (ischemic stroke: 80.4%; transient ischemic attack: 19.6%). Median stroke unit stay lasted 88.8 hours (interquartile range, 65.0-122.0). ECG data for automated CEM analysis were available for a median time of 64.0 hours (43.0-89.8). Paroxysmal AF was documented in 41 of 496 patients (8.3%). Of these, Holter detected pxAF in 34.1%; CEM in 65.9%; and automated CEM in 92.7%. CEM and automated CEM detected significantly more patients with pxAF than Holter (Pstroke on stroke units compared with 24-hour Holter ECG. The comparative usefulness of prolonged or repetitive Holter ECG recordings requires further evaluation.

  15. Requirements for internal contamination monitoring units; Anforderungen an Inkorporationsmessstellen

    Energy Technology Data Exchange (ETDEWEB)

    Werner, E. [GSF, Inst. fuer Biophysikalische Strahlenforschung, Frankfurt am Main (Germany); Beyer, D. [Forschungszentrum Juelich, Abt. ASS (Germany); Doerfel, H. [Hauptabteilung Sicherheit, Kernforschungszentrum Karlsruhe (Germany); Erlenbach, H. [Zentralstelle fuer Sicherheitstechnik NRW, Duesseldorf (Germany); Fischbach, G. [Siemens Brennelementewerk, Hanau (Germany); Henrichs, K. [Siemens AG, Muenchen (Germany); Keller, K.D. [Radiologische Universitaetsklinik, Tuebingen (Germany); Koenig, K. [Bundesamt fuer Strahlenschutz, ISH, Neuherberg (Germany); Riedel, W. [Freie Univ. Berlin, Klinikum Steglitz (Germany); Scheler, R. [Bundesamt fuer Strahlenschutz, FB Strahlenschutz, Berlin (Germany); Schieferdecker, H. [Hauptabteilung Sicherheit, Kernforschungszentrum Karlsruhe (Germany)

    1994-12-31

    For the evaluation of internal contamination by officially authorized monitoring units according to section 63 (6) of the German radiation protection ordinance, a directive will be prepared in order to define uniform requirements for the laboratories in charge of incorporation monitoring by appointment of the relevant authorities. These requirements refer to equipment, to performance of measurements, to interpretation of measured values, to quality control as well as to documentation and to delivery of results. The duties of such laboratories comprise measurements of radioactivity, evaluation of intakes of radionuclides and of the resulting internal radiation dose, but also transmission of results to the employer, to the central dose registry, and under certain circumstances to the authorities. Among the requirements to be met by the laboratory for incorporation control are a sufficient measuring efficiency, the implementation of in-house checks, and the participation in intercomparison programs. For the accomplishment of such duties the laboratory needs appropriate apparatus, rooms, facilities, and staffing. (orig.) [Deutsch] Zur Ermittlung der Koerperdosen nach Paragraph 63 StrlSchV sind fuer die gemaess Abs. 6 von der zustaendigen Behoerde zu bestimmenden Messstellen in einer Richtlinie einheitliche Anforderungen festzulegen. Diese beziehen sich auf deren Ausstattung, die Durchfuehrung der Messungen, Auswertungen und Qualitaetskontrollen sowie die Aufzeichnung und Uebermittlung der Ergebnisse. Die Aufgaben der Messstellen umfassen die Messungen der Radioaktivitaet im Koerper bzw. in Koerperausscheidungen, die Ermittlung der Zufuhr an Radionukliden sowie der daraus resultierenden Koerperdosis und die Weiterleitung der Ergebnisse an den Auftraggeber, an das zentrale Dosisregister und in bestimmten Faellen an die Behoerde. Zu den von einer Messstelle zu erfuellenden Anforderungen gehoeren eine ausreichende Messeffektivitaet, die Durchfuehrung von Eigenkontrollen

  16. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  17. Challenges of ECG monitoring and ECG interpretation in dialysis units.

    Science.gov (United States)

    Poulikakos, Dimitrios; Malik, Marek

    Patients on hemodialysis (HD) suffer from high cardiovascular morbidity and mortality due to high rates of coronary artery disease and arrhythmias. Electrocardiography (ECG) is often performed in the dialysis units as part of routine clinical assessment. However, fluid and electrolyte changes have been shown to affect all ECG morphologies and intervals. ECG interpretation thus depends on the time of the recording in relation to the HD session. In addition, arrhythmias during HD are common, and dialysis-related ECG artifacts mimicking arrhythmias have been reported. Studies using advanced ECG analyses have examined the impact of the HD procedure on selected repolarization descriptors and heart rate variability indices. Despite the challenges related to the impact of the fluctuant fluid and electrolyte status on conventional and advanced ECG parameters, further research in ECG monitoring during dialysis has the potential to provide clinically meaningful and practically useful information for diagnostic and risk stratification purposes. Crown Copyright © 2016. Published by Elsevier Inc. All rights reserved.

  18. Device for monitoring cell voltage

    Science.gov (United States)

    Doepke, Matthias [Garbsen, DE; Eisermann, Henning [Edermissen, DE

    2012-08-21

    A device for monitoring a rechargeable battery having a number of electrically connected cells includes at least one current interruption switch for interrupting current flowing through at least one associated cell and a plurality of monitoring units for detecting cell voltage. Each monitoring unit is associated with a single cell and includes a reference voltage unit for producing a defined reference threshold voltage and a voltage comparison unit for comparing the reference threshold voltage with a partial cell voltage of the associated cell. The reference voltage unit is electrically supplied from the cell voltage of the associated cell. The voltage comparison unit is coupled to the at least one current interruption switch for interrupting the current of at least the current flowing through the associated cell, with a defined minimum difference between the reference threshold voltage and the partial cell voltage.

  19. The Walla Walla Basin Natural Production Monitoring and Evaluation Project : Progress Report, 1999-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Sexton, Amy D.

    2003-06-02

    The Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME). Chapter One provides an overview of the entire report and how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. Chapter One also provides background information relevant to the aquatic resources of the Walla Walla River Basin. Objectives are outlined below for the statements of work for the 1999, 2000, 2001 and 2002 contract years. The same objectives were sometimes given different numbers in different years. Because this document is a synthesis of four years of reporting, we gave objectives letter designations and listed the objective number associated with the statement of work for each year. Some objectives were in all four work statements, while other objectives were in only one or two work statements. Each objective is discussed in a chapter. The chapter that reports activities and findings of each objective are listed with the objective below. Because data is often interrelated, aspects of some findings may be reported or discussed in more than one chapter. Specifics related to tasks, approaches, methods, results and discussion are addressed in the individual chapters.

  20. Long-Term Hydrologic Monitoring Program. Project Shoal site, Sand Springs Range, Churchill County, Nevada

    International Nuclear Information System (INIS)

    1984-05-01

    The Shoal site is located in Churchill County in the northern part of the Sand Springs Range, approximately 30 miles (48.3 kilometers) southeast of Fallon, Nevada. Project Shoal, with a yield of 12 kilotons, was detonated October 26, 1963. It was conducted as part of the Vela program to obtain event measurements relating to the detection of underground nuclear detonations. The purpose of the Long-Term Hydrologic Monitoring Program at the Shoal site is to obtain data that will assure public safety; inform the public, the news media, and the scientific community relative to radiological contamination; and to document compliance with federal, state, and local antipollution requirements. The Shoal site geographical setting, climate, geology, and hydrology are described. Site history, including Shoal event information and Shoal monitoring is described. The final radiological surveys following the Shoal site cleanup described in this report indicate that there are no radiation levels above natural background on or near the land surface and that no hazard exists or is likely to occur during public use of the surface of the Shoal site. The Long-Term Hydrologic Monitoring Program for the Shoal site is described. 17 references, 4 figures