WorldWideScience

Sample records for monitoring plan prepared

  1. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Althouse, P E; Bertoldo, N A; Bowen, B M; Brown, R A; Campbell, C G; Christofferson, E; Gallegos, G M; Grayson, A R; Jones, H E; Larson, J M; Laycak, D; Mathews, S; Peterson, S R; Revelli, M J; Rueppel, D; Williams, R A; Wilson, K; Woods, N

    2005-11-23

    The purpose of the environmental monitoring plan (EMP) is to promote the early identification of, and response to, potential adverse environmental impacts associated with DOE operations. Environmental monitoring supports the Integrated Safety Management System (ISMS) to detect, characterize, and respond to releases from DOE activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of the DOE activity. In addition, the EMP addresses the analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of radionuclide samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. Until recently, environmental monitoring at Lawrence Livermore National Laboratory (LLNL) was required by DOE Order 5400.1, which was canceled in January 2003. LLNL is in the process of adopting the ISO 14001 Environmental Management Systems standard, which contains requirements to perform and document environmental monitoring. The ISO 14001 standard is not as prescriptive as DOE Order 5400.1, which expressly required an EMP. LLNL will continue to prepare the EMP because it provides an organizational framework for ensuring that the work is conducted appropriately. The environmental monitoring addressed by the plan includes preoperational characterization and assessment, and effluent and surveillance monitoring. Additional environmental monitoring is conducted at LLNL as part of the compliance with the

  2. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

  3. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  4. Environmental monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  5. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Althouse, P E; Biermann, A; Brigdon, S L; Brown, R A; Campbell, C G; Christofferson, E; Clark, L M; Folks, K J; Gallegos, G M; Gouveia, F J; Grayson, A; Harrach, R J; Hoppes, W G; Jones, H; Mathews, S; Merrigan, J R; Peterson, S R; Revelli, M; Rueppel, D; Sanchez, L; Tate, P J; Vellinger, R J; Ward, B; Williams, R

    2006-01-10

    Environmental monitoring personnel from Lawrence Livermore National Laboratory (LLNL) prepared this ''Environmental Monitoring Plan'' (EMP) to meet the requirements in the U.S. Department of Energy (DOE) ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' (DOE 1991) and applicable portions of DOE Orders 5400.1 and 5400.5 (see WSS B93 and B94 in Appendix B). ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' is followed as a best management practice; under Work Smart Standards, LLNL complies with portions of DOE Orders 5400.1 and 5400.5 as shown in Appendix B. This document is a revision of the May 1999 EMP (Tate et al. 1999) and is current as of March 1, 2002. LLNL is one of the nation's premier applied-science national security laboratories. Its primary mission is to ensure that the nation's nuclear weapons remain safe, secure, and reliable, and to prevent the spread and use of nuclear weapons worldwide. LLNL's programs in advanced technologies, energy, environment, biosciences, and basic science apply LLNL's unique capabilities and enhance the competencies needed for this national security mission. LLNL's mission also involves working with industrial and academic partners to increase national competitiveness and improve science education. LLNL's mission is dynamic and has changed over the years to meet new national needs. In keeping with the Laboratory's mission, the environment, safety, and health (ES&H) have top priority. LLNL's policy is to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage. The environment, safety, and health are to be priority considerations in the planning and execution of all work activities at the Laboratory (LLNL 2001

  6. Rulison Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile

  7. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  8. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  9. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  10. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  11. Integrated monitoring plan for the Hanford groundwater monitoring project

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, M.J.; Dresel, P.E.; McDonald, J.P.; Mercer, R.B.; Newcomer, D.R.; Thornton, E.C.

    1998-09-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy (DOE) manages these activities through the Hanford Groundwater Monitoring Project (groundwater project), which is the responsibility of Pacific Northwest National Laboratory. The groundwater project does not include all of the monitoring to assess performance of groundwater remediation or all monitoring associated with active facilities. This document is the first integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; other, established monitoring plans by reference; and a master well/constituent/frequency matrix for the entire Hanford Site.

  12. Management plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.; Pratt, D.R.

    1991-08-01

    The DOE/RL 89-19, United States Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (1989), requires the Hanford Site to prepare an Environmental Monitoring Plan (EMP) by November 9, 1991. The DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (1991), provides additional guidance and requires implementation of the EMP within 36 months of the effective data of the rule. DOE Order 5400.1, General Environmental Protection Program, requires each US Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials to prepare an EMP. This EMP is to identify and discuss two major activities: (1) effluent monitoring and (2) environmental surveillance. At the Hanford Site, the site-wide EMP will consist of the following elements: (1) A conceptual plan addressing effluent monitoring and environmental surveillance; (2) Pacific Northwest Laboratory (PNL) site-wide environmental surveillance program; (3) Westinghouse Hanford Company (Westinghouse Hanford) effluent monitoring program consisting of the near-field operations environmental monitoring activities and abstracts of each Facility Effluent Monitoring Plan (FEMP). This management plan addresses the third of these three elements of the EMP, the FEMPs.

  13. Arctic Terrestrial Biodiversity Monitoring Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    The Conservation of Arctic Flora and Fauna (CAFF), the biodiversity working group of the Arctic Council, established the Circumpolar Biodiversity Monitoring Program (CBMP) to address the need for coordinated and standardized monitoring of Arctic environments. The CBMP includes an international...... on developing and implementing long-term plans for monitoring the integrity of Arctic biomes: terrestrial, marine, freshwater, and coastal (under development) environments. The CBMP Terrestrial Expert Monitoring Group (CBMP-TEMG) has developed the Arctic Terrestrial Biodiversity Monitoring Plan (CBMP......-Terrestrial Plan/the Plan) as the framework for coordinated, long-term Arctic terrestrial biodiversity monitoring. The goal of the CBMP-Terrestrial Plan is to improve the collective ability of Arctic traditional knowledge (TK) holders, northern communities, and scientists to detect, understand and report on long...

  14. 40 CFR 74.61 - Monitoring plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this...

  15. Facility Effluent Monitoring Plan determinations for the 600 Area facilities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.

    1991-08-01

    This document determines the need for Facility Effluent Monitoring Plans for Westinghouse Hanford Company's 600 Area facilities on the Hanford Site. The Facility Effluent Monitoring Plan determinations were prepared in accordance with A Guide For Preparing Hanford Site Facility Effluent Monitoring Plans (WHC 1991). Five major Westinghouse Hanford Company facilities in the 600 Area were evaluated: the Purge Water Storage Facility, 212-N, -P, and -R Facilities, the 616 Facility, and the 213-J K Storage Vaults. Of the five major facilities evaluated in the 600 Area, none will require preparation of a Facility Effluent Monitoring Plan.

  16. Habitat monitoring plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management of habitat is required in order to achieve the refuge purpose and wildlife objectives. The Upland Habitat Management Plan (1993, Interim Plan) and the...

  17. Inventory and Monitoring Plan for Deep Fork National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) is prepared to document the inventory and monitoring surveys that will, or could be conducted at Deep Fork National Wildlife...

  18. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-02-19

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  19. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-02-19

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  20. TNO monitoring plan development tool

    NARCIS (Netherlands)

    Sijacic, D.; Wildenborg, T.; Steeghs, P.

    2014-01-01

    TNO has developed a software tool that supports the design of a risk-based monitoring plan for a CO2 storage site. The purpose of the tool is to aid storage site operators by facilitating a structured monitoring technologies selection or evaluation process. The tool makes a selection this recommende

  1. Arctic Terrestrial Biodiversity Monitoring Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    The Conservation of Arctic Flora and Fauna (CAFF), the biodiversity working group of the Arctic Council, established the Circumpolar Biodiversity Monitoring Program (CBMP) to address the need for coordinated and standardized monitoring of Arctic environments. The CBMP includes an international...... network of scientists, conservation organizations, government agencies, Permanent Participants Arctic community experts and leaders. Using an ecosystem-based monitoring approach which includes species, ecological functions, ecosystems, their interactions, and potential drivers, the CBMP focuses...... on developing and implementing long-term plans for monitoring the integrity of Arctic biomes: terrestrial, marine, freshwater, and coastal (under development) environments. The CBMP Terrestrial Expert Monitoring Group (CBMP-TEMG) has developed the Arctic Terrestrial Biodiversity Monitoring Plan (CBMP...

  2. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  3. Facility effluent monitoring plan for the tank farm facility

    Energy Technology Data Exchange (ETDEWEB)

    Crummel, G.M.

    1998-05-18

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  4. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-03-12

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  5. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  6. Facility effluent monitoring plan for the plutonium uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  7. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  8. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...

  9. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  10. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  11. Idaho National Laboratory Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  12. Facility effluent monitoring plan for 242-A evaporator facility

    Energy Technology Data Exchange (ETDEWEB)

    Crummel, G.M.; Gustavson, R.D.

    1995-02-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years.

  13. Little River NWR Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan for Little River National Wildlife Refuge is a step-down from the Comprehensive Conservation Plan and Forest Habitat Management...

  14. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Jenifer Nordstrom

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  15. Facility effluent monitoring plan for the tank farms facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bachand, D.D.; Crummel, G.M.

    1995-05-01

    A facility effluent monitoring plan is required by the US Department of Energy for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using specific guidelines. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years.

  16. The circumpolar biodiversity monitoring program - Terrestrial plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    The Circumpolar Biodiversity Monitoring Program, CBMP, Terrestrial Plan, www.caff.is/terrestrial, is a framework to focus and coordinate monitoring of terrestrial biodiversity across the Arctic. The goal of the plan is to improve the collective ability of Arctic traditional knowledge (TK) holders......, northern communities, and scientists to detect, understand and report on long-term change in Arctic terrestrial ecosystems and biodiversity. This presentation will outline the key management questions the plan aims to address and the proposed nested, multi-scaled approach linking targeted, research based...... monitoring with survey-based monitoring and remotely sensed data. The CBMP Terrestrial Plan intends to build upon and expand existing monitoring networks, engaging participants across a range of capacity and interests. The presentation will summarize the recommended focal soil ecosystem components...

  17. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse Electric Company Waste Isolation Division

    1999-09-29

    DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures

  18. Geographic information system planning and monitoring best ...

    African Journals Online (AJOL)

    emeje

    Key words: GIS, Urban Planning, Urban Monitoring, West Africa, Best Practices, Pollution, flooding .... infrastructure and space, evident in cities such as Lagos,. Kano ... earmarked as green belts are being taken over by corner shops, roads ...

  19. Monitoring Hazardous Fuels Treatments: Southeast Regional Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this document is to provide technical guidance on monitoring activities to refuge staff involved in planning and conducting hazardous fuel treatments....

  20. Guidelines for Transitional Education Plan Preparation

    Science.gov (United States)

    Lattanzio, Raphaëlle Martinez; Bethke, Lynne; Haas, Anna; Perrier, Janne Kjaersgaard; De Grauwe, Anton; Sigsgaard, Morten; Bird, Lyndsay; Coury, Diane; Gay, Dorian; MacEwan, Leonora; Seeger, Anna

    2016-01-01

    The "Guidelines for the Transitional Education Plan Preparation" are the result of an extensive consultation process and the product of fruitful guidance and contributions from key partners active in the field of education in emergencies and protracted crises. The new global education agenda 2030 places strong emphasis on countries…

  1. Environmental Monitoring Plan - February 2016

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bertoldo, N. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Blake, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fish, C. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Grayson, A. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Griffin, D. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jones, H. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Patterson, L. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Revelli, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rosene, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wegrecki, T M; Williams, R A; Wilson, K R

    2016-02-08

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection oft/ic Pubile and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the hiota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements.

  2. The Circumpolar Biodiversity Monitoring Program Terrestrial Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    The Conservation of Arctic Flora and Fauna (CAFF), the biodiversity working group of the Arctic Council, established the Circumpolar Biodiversity Monitoring Program (CBMP) to address the need for coordinated and standardized monitoring of Arctic environments in terrestrial, marine, freshwater...... and coastal environments. The CBMP Terrestrial Plan is a framework to focus and coordinate monitoring of terrestrial biodiversity across the Arctic. The goal of the plan is to improve the collective ability of Arctic traditional knowledge (TK) holders, northern communities, and scientists to detect......, understand and report on long-term change in Arctic terrestrial ecosystems and biodiversity, and to identify knowledge gaps and priorities. This poster will outline the key management questions the plan aims to address and the proposed nested, multi-scaled approach linking targeted, research based monitoring...

  3. Salton Sea ecosystem monitoring and assessment plan

    Science.gov (United States)

    Case(compiler), H. L.; Boles, Jerry; Delgado, Arturo; Nguyen, Thang; Osugi, Doug; Barnum, Douglas A.; Decker, Drew; Steinberg, Steven; Steinberg, Sheila; Keene, Charles; White, Kristina; Lupo, Tom; Gen, Sheldon; Baerenklau, Ken A.

    2013-01-01

    goal of the MAP is to provide a guide for data collection, analysis, management, and reporting to inform management actions for the Salton Sea ecosystem. Monitoring activities are directed at species and habitats that could be affected by or drive future restoration activities. The MAP is not intended to be a prescriptive document. Rather, it is envisioned to be a flexible, program-level guide that articulates high-level goals and objectives, and establishes broad sideboards within which future project-level investigations and studies will be evaluated and authorized. As such, the MAP, by design, does not, for example, include detailed protocols describing how investigations will be implemented. It is anticipated that detailed study proposals will be prepared as part of an implementation plan that will include such things as specific sampling objectives, sampling schemes, and statistical and spatial limits.

  4. Marbled murrelet effectiveness monitoring plan for the Northwest Forest Plan.

    Science.gov (United States)

    Sarah Madsen; Diane Evans; Thomas Hamer; Paul Henson; Sherri Miller; S. Kim Nelson; Daniel Roby; Martin. Stapanian

    1999-01-01

    This report describes options for effectiveness monitoring of long-term status and trends to evaluate the success of the Northwest Forest Plan in maintaining and restoring marbled murrelet nesting habitat and populations on Federal lands. A two-phase approach is described that begins with developing reliable and repeatable processes for identifying nesting habitat and...

  5. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1998-12-31

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  6. COLLABORATIVE MULTI-LEVEL PLAN MONITORING

    Directory of Open Access Journals (Sweden)

    Mohamad K. ALLOUCHE

    2011-01-01

    Full Text Available The recent worldwide connectivity and the net-centricity of military operations (coalition-based operations are witnessing an increasing need for the monitoring of plan execution for enhanced resource management and decision making. Monitoring of ongoing operations is the process of continuous observation recording and reporting. In this process the plan becomes a resource that needs to be managed effi ciently. The centralized approach to plan monitoring soon reaches its limits when plan execution is distributed across different organizations/countries. We propose a new framework that would allow different monitoring nodes distributed across the network. An effi cient propagation mechanism that allows information exchange between the different nodes would also be needed. The main purpose of this mechanism is to present the right information, to the right person, at the right time. To cope with a rapid increase of information fl ow through the network, an effi cient alarm management mechanism allows the presentation of the information with an appropriate level of details.

  7. Savannah River Site Environmental Monitoring Plan. Volume 1, Section 1000 Addendum: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Jannik, G.T.

    1994-10-01

    This document -- the Savannah River Site Environmental Monitoring Plan (SRS EM Plan) -- has been prepared according to guidance contained in the DOE 5400 Series orders, in 10 CFR 834, and in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and environmental Surveillance [DOE, 1991]. The SRS EM Plan`s purpose is to define the criteria, regulations, and guideline requirements with which SRS will comply. These criteria and requirements are applicable to environmental monitoring activities performed in support of the SRS Environmental Monitoring Program (SRS EM Program), WSRC-3Q1-2, Volume 1, Section 1100. They are not applicable to monitoring activities utilized exclusively for process monitoring/control. The environmental monitoring program requirements documented in the SRS EM Plan incorporate all applicable should requirements of DOE/EH-0173T and expand upon them to include nonradiological environmental monitoring program requirements.

  8. 9 CFR 108.3 - Preparation of plot plans.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Preparation of plot plans. 108.3... LICENSED ESTABLISHMENTS § 108.3 Preparation of plot plans. Plot plans shall show all of the buildings on a... on the plot plan the use of immediate adjacent properties such as, residential area, pasture,...

  9. Monitored Geologic Repository Test Evaluation Plan

    Energy Technology Data Exchange (ETDEWEB)

    M.B. Skorska

    2002-01-02

    The Monitored Geologic Repository test & evaluation program will specify tests, demonstrations, examinations, and analyses, and describe procedures to conduct and document testing necessary to verify meeting Monitored Geologic Repository requirements for a safe and effective geologic repository for radioactive waste. This test program will provide assurance that the repository is performing as designed, and that the barriers perform as expected; it will also develop supporting documentation to support the licensing process and to demonstrate compliance with codes, standards, and regulations. This comprehensive program addresses all aspects of verification from the development of test requirements to the performance of tests and reporting of the test results. The ''Monitored Geologic Repository Test & Evaluation Plan'' provides a detailed description of the test program approach necessary to achieve the above test program objectives. This test plan incorporates a set of test phases focused on ensuring repository safety and operational readiness and implements a project-wide integrated product management team approach to facilitate test program planning, analysis, and implementation. The following sections provide a description of the individual test phases, the methodology for test program planning and analyses, and the management approach for implementing these activities.

  10. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Lohrasbi, J.; Johnson, D.L. [Westinghouse Hanford Co., Richland, WA (United States); De Lorenzo, D.S. [Los Alamos Technical Associates, NM (United States)

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  11. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities.

  12. Facility Effluent Monitoring Plan for the 3720 Building

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the Environmental Science Laboratory (3720 Facility) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs'' This FEMP has been prepared for the 3720 Facility primarily because it has a major (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The 3720 Facility provides office and laboratory space for PNNL scientific and engineering staff conducting multidisciplinary research in the areas of materials characterization and testing and waste management. The facility is designed to accommodate the use of radioactive and hazardous materials to conduct these activities. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, and dispersible particulate. The facility is in the process of being vacated for shutdown, but is considered a Major Emission Point as of the date of this document approval.

  13. Groundwater Monitoring Plan for the Solid Waste Landfill

    Energy Technology Data Exchange (ETDEWEB)

    Lindberg, Jonathan W.; Chou, Charissa J.

    2000-10-13

    This monitoring plan includes well and constituent lists, and summarizes sampling, analytical, and quality control requirements. Changes from the previous monitoring plan include elimination of two radionuclides from the analyte list and some minor changes in the statistical analysis.

  14. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  15. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    Energy Technology Data Exchange (ETDEWEB)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.

  16. Facility effluent monitoring plan for the fast flux test facility

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J M; Dahl, N R

    1992-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in US Department of Energy Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A Facility Effluent Monitoring Plan determination was performed during calendar year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  17. A Guide to Food Service Operation Planning with Information on Preparing and Submitting Plans and Specifications.

    Science.gov (United States)

    Ohio State Dept. of Health, Columbus.

    Guidelines are presented for planning a food service operation which is defined as any place kept or maintained for the purpose of preparing or serving meals or lunches for a consideration. Brief discussions are presented pertaining to the value of planning and the preparation and use of plans and specifications. Recommendations and specifications…

  18. Ranch business planning and resource monitoring for rangeland sustainability

    Science.gov (United States)

    Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite

    2012-01-01

    Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...

  19. FY 2002 Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

    2001-10-31

    This document is an integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders ("surveillance monitoring"); other, established monitoring plans by reference; and a master well/ constituent/frequency matrix for the entire Hanford Site.

  20. Least tern monitoring plan at Kirwin Reservoir [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This monitoring plan was developed in accordance with the environmental commitment plan contained in the final environmental assessment (FEA) and Finding of No...

  1. Habitat Monitoring and Inventory Plan : Malheur National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the Habitat Monitoring and Inventory Plan for Malheur National Wildlife Refuge. The goal of this plan is to develop an annual procedure to determine the...

  2. Inventory and Monitoring Plan Dahomey National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) documents the inventory and monitoring surveys that will or could be conducted at Dahomey NWR from 2015 through 2030, or...

  3. Inventory and Monitoring Plan Coldwater River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) documents the inventory and monitoring surveys that will or could be conducted at Coldwater River NWR from 2016 through...

  4. Inventory and Monitoring Plan for Two Rivers National Wildlife Refuge.

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This inventory and monitoring plan (IMP) documents the inventory and monitoring surveys thatwill be conducted at Two Rivers National Wildlife Refuge from 2014...

  5. Inventory and Monitoring Plan for Cypress Creek National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) documents the inventory and monitoring surveys that will be conducted at Cypress Creek National Wildlife Refuge (CCNWR) from...

  6. Port Louisa National Wildlife Refuge Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This inventory and monitoring plan (IMP) documents the inventory and monitoring surveys that will be conducted at Port Louisa National Wildlife Refuge (NWR) from...

  7. Guidelines for Preparing Gender Responsive EFA Plans. Education for All.

    Science.gov (United States)

    United Nations Educational, Scientific and Cultural Organization, Bangkok (Thailand). Principal Regional Office for Asia and the Pacific.

    These guidelines have been prepared to assist individuals and "teams" to produce EFA (Education for All) plans that are gender responsive. The guidelines aim to raise awareness about issues that need to be considered to produce plans leading to the achievement of gender equality in education. Further information and guidance regarding…

  8. 25 CFR 273.14 - Preparing the education plan.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Preparing the education plan. 273.14 Section 273.14 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.14 Preparing...

  9. Retirement Plan Lawsuits: Preparing for the Storm

    Science.gov (United States)

    Morahan, John; Turner, Aaron

    2017-01-01

    Currently, higher education is being roiled by class-action lawsuits filed against high-profile institutions, including MIT, Yale and New York University, over management of their retirement plans. As the lawyers are deployed and the billable hours accrue, it is timely to examine how those who have responsibility for retirement plan…

  10. Near-facility environmental monitoring quality assurance project plan

    Energy Technology Data Exchange (ETDEWEB)

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  11. Chapter 3. Planning and design for habitat monitoring

    Science.gov (United States)

    Christina D. Vojta; Lyman L. McDonald; C. Kenneth Brewer; Kevin S. McKelvey; Mary M Rowland; Michael I. Goldstein

    2013-01-01

    This chapter provides guidance for designing a habitat monitoring program so that it will meet the monitoring objective, will be repeatable, and will adequately represent habitat within the spatial extent of interest. Although a number of excellent resources are available for planning and designing a monitoring program for wildlife populations (e.g., Busch and Trexler...

  12. PREPARE: guidelines for planning animal research and testing.

    Science.gov (United States)

    Smith, Adrian J; Clutton, R Eddie; Lilley, Elliot; Hansen, Kristine E Aa; Brattelid, Trond

    2017-01-01

    There is widespread concern about the quality, reproducibility and translatability of studies involving research animals. Although there are a number of reporting guidelines available, there is very little overarching guidance on how to plan animal experiments, despite the fact that this is the logical place to start ensuring quality. In this paper we present the PREPARE guidelines: Planning Research and Experimental Procedures on Animals: Recommendations for Excellence. PREPARE covers the three broad areas which determine the quality of the preparation for animal studies: formulation, dialogue between scientists and the animal facility, and quality control of the various components in the study. Some topics overlap and the PREPARE checklist should be adapted to suit specific needs, for example in field research. Advice on use of the checklist is available on the Norecopa website, with links to guidelines for animal research and testing, at https://norecopa.no/PREPARE .

  13. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Paquette, D.; Lee, R. [and others

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  14. Facility effluent monitoring plan for the 327 Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    The 327 Facility [Post-Irradiation Testing Laboratory] provides office and laboratory space for Pacific Northwest Laboratory (PNL) scientific and engineering staff conducting multidisciplinary research in the areas of post-irradiated fuels and structural materials. The facility is designed to accommodate the use of radioactive and hazardous materials in the conduct of these activities. This report summarizes the airborne emissions and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

  15. Facility effluent monitoring plan for WESF

    Energy Technology Data Exchange (ETDEWEB)

    SIMMONS, F.M.

    1999-09-01

    The FEMP for the Waste Encapsulation and Storage Facility (WESF) provides sufficient information on the WESF effluent characteristics and the effluent monitoring systems so that a compliance assessment against applicable requirements may be performed. Radioactive and hazardous material source terms are related to specific effluent streams that are in turn, related to discharge points and, finally are compared to the effluent monitoring system capability.

  16. NWRS Region 6 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 6, Inventory and Monitoring Program (I present vision and...

  17. Quagga mussel monitoring plan : NDOW Eastern region 2007

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objective detailed in this plan is to intensively monitor Wildhorse Reservoir, South Fork Reservoir and the Ruby Lake NWR for the presence of quagga mussels....

  18. Inventory and Monitoring Plan Big Branch Marsh National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Branch Marsh IMP was developed according to the Inventory and Monitoring (I 1) is an operational plan for one or more refuges that clearly states I 2)...

  19. South Bay Salt Pond Restoration Project : Phase 1 monitoring plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This SBSP Restoration Project Monitoring Plan provides methods to document the effect of restoration on important elements such as mercury uptake, and water and...

  20. Kulm Wetland Management District Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) documents natural resource surveys that will be conducted for Kulm Wetland Management District from 2015 through 2030, or...

  1. Inventory and Monitoring Plan for Morris Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents and prioritizes inventory and monitoring surveys and research currently conducted, and proposed to be conducted at the Morris Wetland Management...

  2. Inventory Monitoring Plan for Pee Dee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Inventory and Monitoring Plan (IMP) is to describe and recommend what natural resource surveys will be conducted at the Pee Dee National Wildlife...

  3. Inventory and Monitoring Plan for Rachel Carson National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents and prioritizes inventory and monitoring surveys and research currently conducted, and proposed to be conducted, at the Rachel Carson National...

  4. NWRS Region 1 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 1, Inventory and Monitoring Program (I present vision and...

  5. Muscatatuck National Wildlife Refuge Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan (IMP) documents the inventory and monitoring surveys that will be conducted at the Muscatatuck National Wildlife Refuge from 2013 through 2028, or until...

  6. Inventory and Monitoring Plan: Carolina Sandhills National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Inventory and Monitoring Plan (IMP) is to describe and recommend what natural resource surveys will be conducted at the Carolina Sandhills NWR...

  7. Inventory and Monitoring Plan for Columbia National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents and prioritizes inventory and monitoring surveys and research currently conducted, and proposed to be conducted, at the Columbia National...

  8. Inventory and Monitoring Plan for Anaho Island National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Inventory and Monitoring Plan (IMP) identifies the surveys that a refuge intends to conduct over the next 15 years and briefly describes the purpose, management...

  9. NWRS Region 3 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 3, Inventory and Monitoring Program (I present vision and...

  10. The Great Dismal Swamp National Wildlife Refuge Contaminants Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Alternatives for an environmental contaminants monitoring plan have been developed for the Great Dismal Swamp National Wildlife Refuge (Refuge). This study...

  11. NWRS Region 2 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 2, Inventory and Monitoring Program (I present vision and...

  12. NWRS Region 8 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  13. NWRS Region 7 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 7, Inventory and Monitoring Program (I present vision and...

  14. NWRS Region 4 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 4, Inventory and Monitoring Program (I present vision and...

  15. Quivira NWR Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The IMP is an operational plan that provides management rationale and logistical considerations of surveys, and is consistent with the station’s Comprehensive...

  16. Quality assurance program plan for radionuclide airborne emissions monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements.

  17. Planning and monitoring the execution of web service requests

    NARCIS (Netherlands)

    Lazovik, Alexander; Aiello, Marco; Papazoglou, Mike

    2006-01-01

    Interaction with web services enabled marketplaces would be greatly facilitated if users were given a high level service request language to express their goals in complex business domains. This can be achieved by using a planning framework which monitors the execution of planned goals against prede

  18. Guideline for the preparation of a contractor safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Stinnett, L

    1982-04-01

    This document is only a guideline for contractors to use in formalizing a safety program or preparing a safety plan. It contains a format of a suggested safety plan as well as pertinent safety elements which should be considered for inclusion. However, consideration of only those items listed may not be sufficient. Each contractor should include in the safety plan particular reference to those elements peculiar to the inherent hazards of the contractor's specific type of construction services, whether the hazard is shown in the list of safety elements or not. Each safety plan should be reviewed annually by the contractor's management. Reissue of the safety plan is mandatory if safety requirements have changed, or if the contractor's address or management (approval signature) has changed.

  19. Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Leslie A. [DOE/NNSA

    2004-09-01

    The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

  20. Engaging Students in Career Planning and Preparation through Ementoring

    Science.gov (United States)

    Kinkel, Doreen H.

    2011-01-01

    Following a developmental model of career planning and preparation, an ementoring program was devised for first semester freshmen to (1) heighten career awareness and stimulate career exploration in food and agricultural sciences; (2) expand interest and willingness to follow career opportunities beyond the regional geographic area; and (3)…

  1. Mental fatigue and task control : Planning and preparation

    NARCIS (Netherlands)

    Lorist, MM; Klein, M; Nieuwenhuis, S; De Jong, R; Mulder, G; Meijman, TF

    2000-01-01

    The effects of mental fatigue on planning and preparation for future actions were examined, using a task switching paradigm. Fatigue was induced by "time on task," with subjects performing a switch task continuously for 2 hr. Subjects had to alternate between tasks on every second trial, so that a n

  2. Air Pollution Monitoring | Air Quality Planning & Standards ...

    Science.gov (United States)

    2016-06-08

    The basic mission of the Office of Air Quality Planning and Standards is to preserve and improve the quality of our nation's air. To accomplish this, OAQPS must be able to evaluate the status of the atmosphere as compared to clean air standards and historical information.

  3. 40 CFR 75.53 - Monitoring plan.

    Science.gov (United States)

    2010-07-01

    ...) Information, including (as applicable): identification of the test strategy; protocol for the relative... emission rate, and span; and apportionment strategies under §§ 75.10 through 75.18. (ii) Description of... diagrams showing the dimensions and location of fans, turning vanes, air preheaters, monitor...

  4. Environmental Monitoring Plan: Environmental Monitoring Section. Appendix A, Procedures

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    This document presents information about the environmental monitoring program at Lawrence Livermore National Laboratory. Topics discussed include: air sampling; air tritium calibrations; storm water discharge; non-storm water discharge; sampling locations; ground water sampling; noise and blast forecasting; analytical laboratory auditing; document retention; procedure writing; quality assurance programs for sampling; soil and sediment sampling; sewage sampling; diversion facility tank sampling; vegetation and foodstuff sampling; and radiological dose assessments.

  5. Business Continuity Planning: Are We Prepared for Future Disasters

    Directory of Open Access Journals (Sweden)

    Naill M. Momani

    2010-01-01

    Full Text Available Problem statement: Natural and man-made disasters could cause a lot of monetary, mortality and morbidity losses for our business’ operations such as: Activities, products and services. In order to minimize losses from such disasters, it is essential to prepare and implement effective business continuity plans that could deal with abnormal conditions. Approach: In this study, a discussion of the major risk factors that could cause business disruption and the main strategies to prevent business’ losses were discussed so as to advice effective business continuity plans for organizations. Results: Risks are due to human and technology factors, natural and man-made disasters are the main contributors to business’ losses. Conclusion/Recommendations: This study introduced the main components to evaluate and modernize business continuity plans with the intention to develop effective business continuity plans.

  6. Standard Practice for Preparation of Aerospace Contamination Control Plans

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This practice is intended to assist in the preparation of formal plans for contamination control, especially of aerospace critical surfaces. Requirements may be established at the systems level, either by the customer or the systems integrator, or at the subsystem level. Subsystem requirements may be imposed by the responsible subsystem supplier or they may be flowed down from the systems organization (4.7). The extent of detail and level of cleanliness required can vary with the particular application and type of hardware being built, but all aspects of contamination control must be included in a final plan. Therefore, each of the following elements must be considered for inclusion in a contamination control plan (CCP): 1.1.1 Cleanliness requirements for deliverable hardware addressing particulate, molecular, or biological contaminants or combination thereof. Specify contamination limits and any budget allocations. 1.1.2 Implementation plans to achieve, verify, and maintain the specified cleanliness re...

  7. Groundwater Monitoring Plan for the Solid Waste Landfill

    Energy Technology Data Exchange (ETDEWEB)

    JW Lindberg; CJ Chou

    2000-12-14

    The Solid Waste Landfill (SWL) is regulated by the Washington State Department of Ecology under WAC 173-304. Between 1973 and 1976, the landfill received primarily paper waste and construction debris, but it also received asbestos, sewage, and catch tank liquid waste. Groundwater monitoring results indicate the SWL has contaminated groundwater with volatile organic compounds and possibly metals at levels that exceed regulatory limits. DynCorp, Tri-Cities, Inc. operates the facility under an interim closure plan (final closure plan will be released shortly). Pacific Northwest National Laboratory (PNNL) monitors groundwater at the site. This monitoring plan includes well and constituent lists, and summarizes sampling, analytical, and quality control requirements. Changes from the previous monitoring plan include elimination of two radionuclides from the analyte list and some minor changes in the statistical analysis. Existing wells in the current monitoring network only monitor the uppermost portion of the upper-most aquifer. Therefore, two new downgradient wells and one existing upgradient well are proposed to determine whether groundwater waste constituents have reached the lower portion of the uppermost aquifer. The proposed well network includes three upgradient wells and ten downgradient wells. The wells will be sampled quarterly for 14 analytes required by WAC 173-304-490 plus volatile organic compounds and filtered arsenic as site-specific analytes.

  8. Planning aquatic ecosystem restoration monitoring programs

    Energy Technology Data Exchange (ETDEWEB)

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  9. Preparing US community greenhouse gas inventories for climate action plans

    Energy Technology Data Exchange (ETDEWEB)

    Blackhurst, Michael [Department of Civil, Architectural and Environmental Engineering, The University of Texas at Austin, 1 University Station C1752, Austin, TX 78712-0276 (United States); Scott Matthews, H; Hendrickson, Chris T [Department of Civil and Environmental Engineering, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States); Sharrard, Aurora L [Green Building Alliance, 333 East Carson Street, Suite 331, Pittsburgh, PA 15219 (United States); Azevedo, Ines Lima, E-mail: mblackhurst@gmail.com, E-mail: hsm@cmu.edu, E-mail: auroras@gbapgh.org, E-mail: cth@andrew.cmu.edu, E-mail: iazevedo@cmu.edu [Department of Engineering and Public Policy, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States)

    2011-07-15

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  10. Preparing US community greenhouse gas inventories for climate action plans

    Science.gov (United States)

    Blackhurst, Michael; Matthews, H. Scott; Sharrard, Aurora L.; Hendrickson, Chris T.; Lima Azevedo, Inês

    2011-07-01

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  11. Facility effluent monitoring plan for K area spent fuel storage basin

    Energy Technology Data Exchange (ETDEWEB)

    Hunacek, G.S., Westinghouse Hanford

    1996-08-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400. 1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in WHC-EP-0438-1, A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the second revision to the original annual report. Long-range integrity ofthe effluent monitoring systenu shall be ensured with updates of this report whenever a new process or oper&ion introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimwn of every three years.

  12. Final work plan : groundwater monitoring at Morrill, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at Morrill, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Morrill being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Morrill.

  13. Final work plan : groundwater monitoring at Centralia, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2005-08-31

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at the site of a former grain storage facility at Centralia, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Centralia being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Centralia.

  14. Facility effluent monitoring plan for the 324 Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    The 324 Facility [Waste Technology Engineering Laboratory] in the 300 Area primarily supports the research and development of radioactive and nonradioactive waste vitrification technologies, biological waste remediation technologies, spent nuclear fuel studies, waste mixing and transport studies, and tritium development programs. All of the above-mentioned programs deal with, and have the potential to, release hazardous and/or radioactive material. The potential for discharge would primarily result from (1) conducting research activities using the hazardous materials, (2) storing radionuclides and hazardous chemicals, and (3) waste accumulation and storage. This report summarizes the airborne and liquid effluents, and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterizing effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

  15. Omaha District Final Cultural Resource Site Monitoring Plan

    Science.gov (United States)

    2014-06-01

    Game , Fish, Parks and Recreation FINAL CULTURAL RESOURCES SITE MONITORING PLAN U.S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT JUNE 2014 Page | 2...to collect routine monitoring data, which is uploaded into CR-DMS. Pathfinder Office is utilized for pre and post processing of data. Detailed...collecting. The data dictionary is created in Pathfinder office and transferred to the unit. The data dictionary is utilized to collect information

  16. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring office responsibility for monitoring plans and reports. 108.20 Section 108.20 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY,...

  17. Total monitor units influence on plan quality parameters in volumetric modulated arc therapy for breast case.

    Science.gov (United States)

    Mancosu, P; Reggiori, G; Alongi, F; Cozzi, L; Fogliata, A; Lobefalo, F; Navarria, P; Stravato, A; Tomatis, S; Scorsetti, M

    2014-05-01

    To investigate the correlation between total monitor units (MU), dosimetric findings, and pre-treatment quality assurance for volumetric modulated arc therapy (VMAT) by RapidArc (RA). Ten patients with breast cancer were considered. Dose prescriptions were: 48 Gy and 40.5 Gy in 15 fractions to, respectively, PTV(Boost) and PTVWholeBreast. A reference plan was optimized and four more plans using the "MU Objective", a tool for total MU controlling, were prepared imposing ± 20 and ± 50% total MU for inducing different complexities. Plan objectives were: D95% > 95% for both PTVs, and D2% Plans were evaluated in terms of technical parameters, dosimetric plan objectives findings and pre-treatment quality assurance (QA). Concerning PTVs, there were no significant differences for target coverage (D95%); mean doses for ipsilateral lung and controlateral breast, and V18 Gy for heart decreased with MUs increasing, reaching a plateau with reference plan. Body volume receiving low dose (V5-10 Gy) was minimized for reference plans. All plans had GAI (3 mm, 3%) > 95%. The data suggest that the best plan is the reference one, where the "MU Objective" tool was not used during optimisation. Nevertheless, it is advisable to use the "MU Objective" tool for re-planning when low GAI is found to increase its value. In this case, attention should be paid to OARs dose limits, since their values may be increased. Copyright © 2013 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  18. Epidemiological monitoring plan for geothermal developments.

    Science.gov (United States)

    Deane, M

    1984-01-27

    In order to assure that geothermal developments in the Imperial Valley of California proceeded on an environmentally sound basis, The U.S. Energy Research and Development Administration contracted with the Lawrence Livermore Laboratory to conduct a comprehensive study of six aspects of the region and its potential problems: Air Quality Water Quality, Ecosystem Quality (Soil, Plants, Animals, etc.) Subsidence and Induced Seismicity, Health Effects, and Socio-Economic Effects which may result from the proposed development. This report of the possible health effects is designed to be repeated as geothermal developments progress. It includes both general health attributes and attributes which may be likely to be adversely affected by such developments and is focussed on two different populations, one likely to be affected and a second which is less likely to be affected. Such a design permits the easier identification of possible effects against a background of time-dependent processes in later phases of the study. This baseline study documents that before such developments, there were differences in health status of the two areas, which were chosen to maximize demographic comparability. It further identifies that odor, a possible problem associated with geothermal development, is currently present, and at times intense. Without such baseline monitoring, the likelihood is great that such effects in the future might be falsely ascribed to the geothermal development.

  19. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.

  20. Topological clustering as a tool for planning water quality monitoring in water distribution networks

    DEFF Research Database (Denmark)

    Kirstein, Jonas Kjeld; Albrechtsen, Hans-Jørgen; Rygaard, Martin

    2015-01-01

    Topological clustering was explored as a tool for water supply utilities in preparation of monitoring and contamination contingency plans. A complex water distribution network model of Copenhagen, Denmark, was simplified by topological clustering into recognizable water movement patterns to: (1......) identify steady clusters for a part of the network where an actual contamination has occurred; (2) analyze this event by the use of mesh diagrams; and (3) analyze the use of mesh diagrams as a decision support tool for planning water quality monitoring. Initially, the network model was divided...... into strongly and weakly connected clusters for selected time periods and mesh diagrams were used for analysing cluster connections in the Nørrebro district. Here, areas of particular interest for water quality monitoring were identified by including user-information about consumption rates and consumers...

  1. Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C.

    2005-09-01

    This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

  2. Workshop on the preparation of climate change action plans. Workshop summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  3. 77 FR 13141 - Notice of Intent To Prepare a Master Leasing Plan, Amendments to the Resource Management Plans...

    Science.gov (United States)

    2012-03-05

    ... Bureau of Land Management Notice of Intent To Prepare a Master Leasing Plan, Amendments to the Resource..., intend to prepare a Master Leasing Plan (MLP), amendments to the 2008 Moab and Monticello Resource Management Plans (RMPs), and a single environmental impact statement (EIS) to consider leasing for oil...

  4. Gender Sensitive Planning, Monitoring and Evaluation in Agricultural Water Management

    OpenAIRE

    Gautam, Suman Rimal; Kuriakose, Anne

    2016-01-01

    Agricultural water management projects that take an inclusive, participatory gendersensitive approach at all levels of the project cycle help increase project effectiveness and improve account of livelihood concerns of women and the rural poor. Participatory planning methods; creation of genderspecific indicators; continuous monitoring; and beneficiary-led impact assessment are key features of this approach.

  5. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

  6. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Sharon D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  7. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    Energy Technology Data Exchange (ETDEWEB)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad (Iraq Ministry of Science and Technology)

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

  8. Development of measuring apparatus for monitoring the preparation of fines

    Energy Technology Data Exchange (ETDEWEB)

    Bechmann, C.; Fauth, G.; Luedke, H.; Schieder, T.

    1984-01-01

    Monitoring or controlling a preparation process requires a sufficiently precise knowledge of the raw material characteristics and also high-speed automatic analysis by measuring apparatus of the quantities and properties of bulk materials and pulpflows. Such apparatus includes devices to measure ash content of pulps, concentration of solids, grain size or grain size distribution and pulp flow. For monitoring flotation, radiometric analysis of the ash content of pulps using the transmission method was tested in a semi-industrial plant. The radioactive sources used were Americium 241 and Caesium 137. The residual standard deviation compared with manual sampling was about 1 g/l for the solids concentration and around 0.4% for ash content. As regards the measurement of grain size and grain size distribution, optical methods have proved to be unsuitable for operational use in coal preparation plants. The ultrasonic absorption method requires further basic research. For short time-interval measurement of pulp flows using devices requiring no conversion, the devices based on the ultrasonic Doppler effect did not yield satisfactory results during operational testing in spite of the accuracy achieved on the test rig. For monitoring washery water thickeners, measuring by means of photometric devices has proved to be suitable for operational use.

  9. Enhancing The National Map Through Tactical Planning and Performance Monitoring

    Science.gov (United States)

    ,

    2008-01-01

    Tactical planning and performance monitoring are initial steps toward improving 'the way The National Map works' and supporting the U.S. Geological Survey (USGS) Science Strategy. This Tactical Performance Planning Summary for The National Map combines information from The National Map 2.0 Tactical Plan and The National Map Performance Milestone Matrix. The National Map 2.0 Tactical Plan is primarily a working document to guide The National Map program's execution, production, and metrics monitoring for fiscal years (FY) 2008 and 2009. The Tactical Plan addresses data, products, and services, as well as supporting and enabling activities. The National Map's 2-year goal for FY 2008 and FY 2009 is to provide a range of geospatial products and services that further the National Spatial Data Infrastructure and underpin USGS science. To do this, the National Geospatial Program will develop a renewed understanding during FY 2008 of key customer needs and requirements, develop the infrastructure to support The National Map business model, modernize its business processes, and reengineer its workforce. Priorities for The National Map will be adjusted if necessary to respond to changes to the project that may impact resources, constrain timeframes, or change customer needs. The supporting and enabling activities that make it possible to produce the products and services of The National Map will include partnership activities, improved compatibility of systems, outreach, and integration of data themes.

  10. Tank monitor and control system (TMACS) software configuration management plan

    Energy Technology Data Exchange (ETDEWEB)

    GLASSCOCK, J.A.

    1999-05-13

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments.

  11. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  12. Project Planning, Implementation and Monitoring Issues, Findings and Recommendations

    Directory of Open Access Journals (Sweden)

    Muhammad Salim Javed

    2012-08-01

    Full Text Available The Higher Education Commission (HEC, Pakistan is one of the prestigious institutions of Government of Pakistan. It sets educational policies for all public and private sector universities of Pakistan. The objective of this study is to find institutional problems and issues of a project planning, implementation and monitoring issues. For this purpose, projects data were collected from Project Directors, HEC personnel's and consultants. Data were collected from 150 public and private sector universities and higher learning institution in the regions of Pakistan (i.e., Khyber Pakhtoon Khwa, Punjab, Sindh, Balochistan and Azad Jamu Kashmir using questionnaires. To provide the data, respondents were given the choice of being interviewed or self-administer the questionnaire and send them back to the researcher. After studying and analyzing the data, main problem and issues in project planning, implementation and monitoring issues were identified. In the view of these responses, rPecommendation had been concluded.

  13. Military plans massive Arctic exercise to prepare for environmental disaster

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2004-12-01

    Planning by the Canadian military for a major exercise to prepare for a possible environmental disaster in the Mackenzie Delta is reported. There has been intense energy exploration over the least few years in the region and more is expected as the proposed pipeline to transport natural gas to southern markets is constructed. Additional drilling in the Beaufort Sea is also being rumored, which would represent further threat to the environment. The object of the exercise is for the military to be ready to respond to any industrial or shipping accident since the territorial government does not have the resources to do so. The Canadian Coast Guard and the RCMP also participated in the exercise last year; current plans call for bringing in Parks Canada, Environment Canada, the Department of Fisheries and Oceans, and some of the Alaska-based Americans to participate in the exercises this year. This year's exercises will address some of the recommendations contained in the 2000 Arctic Capability Report which was particularly critical of the lack of contingency planning, the reduced Arctic training received by the military, and the quality of equipment available to the military to respond to emergencies.

  14. The ANURIB project at VECC – Plans and preparations

    Energy Technology Data Exchange (ETDEWEB)

    Chakrabarti, Alok, E-mail: alok@vecc.gov.in; Bandyopadhyay, Arup; Naik, Vaishali; Dechoudhury, Siddhartha; Mondal, Manas; Nabhiraj, P.Y.

    2013-12-15

    VECC is planning to develop a rare ion beam facility called ANURIB (Advanced National facility for Unstable and Rare Isotope Beams) at the upcoming new campus at New Town in Kolkata. ANURIB aims to attract a wide user community in nuclear physics, nuclear-astrophysics, material science and biology and will provide India with world class accelerator facilities. ANURIB will be built around a 50 MeV 100 kW superconducting electron linac (e-Linac) photo-fission driver and is planned to be a combined ISOL and PFS type facility. Construction of the facility will also enable next generation research into production of medical isotopes. In preparation for ANURIB, a low energy ISOL type facility has been built around the existing K130 cyclotron at VECC. Developed for the past decade, this facility was aimed at completing major R and D steps involved in the construction of ANURIB. Presently this facility accelerates beams up to energy of 415 keV/u and recently first radioactive beams have been produced. Development of a 10 MeV Injector Cryo Module for the e-Linac has been started in collaboration with TRIUMF. In this paper the plans for ANURIB project and present status of the R and D activities will be presented.

  15. 2009 review of the Deep Panuke Environmental Effects Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Oceans, Habitat and Species at Risk branch of the Department of Fisheries and Oceans Canada requested an update to the Environmental Management Plan for the construction of the Deep Panuke Project. Specifically, it requested expert advice on the 2009-2010 Drilling Environmental Protection Plan/Environmental Effects Monitoring Plan (EPP/EEMP), which outlines the measures that EnCana proposes take to avoid or minimize the effects of drilling in the marine environment. Although the proposed approach was deemed to be sufficient, the EPP/EEMP did not make reference to the potential effects of noise on marine species. The jack-up rig mobile offshore production unit that is proposed for well drilling and well re-entries was considered to produce lower noise levels than drillships and semi submersibles. It was concluded that jack up drilling at Deep Panuke would not likely require special noise mitigation measures, but more extensive measurement and documentation of acoustic noise levels around active rigs is recommended. The risk of well blowout or collapse was deemed low. Should such an event occur, the impact of the released hydrocarbon condensate would depend on the rate and duration of the release. Under typical conditions, the proponent's models reasonably show the blowout discharge drifting away from Sable Island. However, there is a very low risk that certain weather conditions would result in an oil spill reaching Sable Island. The EPP/EEMP does not address species at risk in any way, and mitigation measures are required and should be detailed in the monitoring plan. It was concluded that the proposed EPP/EEMP is sufficient in many areas, but since most mitigation measures are based on theoretical considerations alone, a plan for field monitoring at the drilling site is needed. 3 refs.

  16. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Science.gov (United States)

    2010-04-13

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring Requirements for Indianapolis Power and Light--Harding Street Station AGENCY: Environmental... State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light...

  17. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) of riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.

  18. Facility effluent monitoring plan for the 325 Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The Applied Chemistry Laboratory (325 Facility) houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and mixed hazardous waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials, and a waste treatment facility for processing hazardous, mixed, low-level, and transuranic wastes generated by Pacific Northwest Laboratory. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, particulate, and gas. Some of these materials are also heated during testing which can produce vapors. The research activities have been assigned to the following activity designations: High-Level Hot Cell, Hazardous Waste Treatment Unit, Waste Form Development, Special Testing Projects, Chemical Process Development, Analytical Hot Cell, and Analytical Chemistry. The following summarizes the airborne and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

  19. BNL ENVIRONMENTAL MONITORING PLAN TRIENNIAL UPDATE, JANUARY 2003.

    Energy Technology Data Exchange (ETDEWEB)

    BROOKHAVEN NATIONAL LABORATORY

    2003-01-01

    Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on site enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.

  20. Revised ground-water monitoring compliance plan for the 300 area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

  1. 7 CFR 1724.53 - Preparation of plans and specifications.

    Science.gov (United States)

    2010-01-01

    ..., including a one-line diagram, plot and foundation plan, grounding plan, and plans and elevations of..., including: (A) A plot plan showing the location of the proposed building plus paving and site...

  2. On the role of model-based monitoring for adaptive planning under uncertainty

    Science.gov (United States)

    Raso, Luciano; Kwakkel, Jan; Timmermans, Jos; Haasnoot, Mariolijn

    2016-04-01

    Adaptive plans, designed to anticipate and respond to an unfolding uncertain future, have found a fertile application domain in the planning of deltas that are exposed to rapid socioeconomic development and climate change. Adaptive planning, under the moniker of adaptive delta management, is used in the Dutch Delta Program for developing a nation-wide plan to prepare for uncertain climate change and socio-economic developments. Scientifically, adaptive delta management relies heavily on Dynamic Adaptive Policy Pathways. Currently, in the Netherlands the focus is shifting towards implementing the adaptive delta plan. This shift is especially relevant because the efficacy of adaptive plans hinges on monitoring on-going developments and ensuring that actions are indeed taken if and when necessary. In the design of an effective monitoring system for an adaptive plan, three challenges have to be confronted: • Shadow of the past: The development of adaptive plans and the design of their monitoring system relies heavily on current knowledge of the system, and current beliefs about plausible future developments. A static monitoring system is therefore exposed to the exact same uncertainties one tries to address through adaptive planning. • Inhibition of learning: Recent applications of adaptive planning tend to overlook the importance of learning and new information, and fail to account for this explicitly in the design of adaptive plans. • Challenge of surprise: Adaptive policies are designed in light of the current foreseen uncertainties. However, developments that are not considered during the design phase as being plausible could still substantially affect the performance of adaptive policies. The shadow of the past, the inhibition of learning, and the challenge of surprise taken together suggest that there is a need for redesigning the concepts of monitoring and evaluation to support the implementation of adaptive plans. Innovations from control theory

  3. 76 FR 33341 - Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area...

    Science.gov (United States)

    2011-06-08

    ... costs of management. Preliminary planning criteria include: 1. Lands addressed in the RMP will be public... Bureau of Land Management Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area in the State of Oregon and Associated Environmental Impact Statement AGENCY: Bureau...

  4. Monitoring and evaluation plan for the Nez Perce Tribal Hatchery

    Energy Technology Data Exchange (ETDEWEB)

    Steward, C.R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan, the 1995 Supplement to the Master Plan, and the Nez Perce Tribal Hatchery Program Environmental Impact Statement. The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts.

  5. Auditory N1 reveals planning and monitoring processes during music performance.

    Science.gov (United States)

    Mathias, Brian; Gehring, William J; Palmer, Caroline

    2017-02-01

    The current study investigated the relationship between planning processes and feedback monitoring during music performance, a complex task in which performers prepare upcoming events while monitoring their sensory outcomes. Theories of action planning in auditory-motor production tasks propose that the planning of future events co-occurs with the perception of auditory feedback. This study investigated the neural correlates of planning and feedback monitoring by manipulating the contents of auditory feedback during music performance. Pianists memorized and performed melodies at a cued tempo in a synchronization-continuation task while the EEG was recorded. During performance, auditory feedback associated with single melody tones was occasionally substituted with tones corresponding to future (next), present (current), or past (previous) melody tones. Only future-oriented altered feedback disrupted behavior: Future-oriented feedback caused pianists to slow down on the subsequent tone more than past-oriented feedback, and amplitudes of the auditory N1 potential elicited by the tone immediately following the altered feedback were larger for future-oriented than for past-oriented or noncontextual (unrelated) altered feedback; larger N1 amplitudes were associated with greater slowing following altered feedback in the future condition only. Feedback-related negativities were elicited in all altered feedback conditions. In sum, behavioral and neural evidence suggests that future-oriented feedback disrupts performance more than past-oriented feedback, consistent with planning theories that posit similarity-based interference between feedback and planning contents. Neural sensory processing of auditory feedback, reflected in the N1 ERP, may serve as a marker for temporal disruption caused by altered auditory feedback in auditory-motor production tasks.

  6. Hood River Production Program : Hood River Fish Habitat Protection, Restoration, and Monitoring Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Coccoli, Holly; Lambert, Michael

    2000-02-01

    Effective habitat protection and rehabilitation are essential to the long-term recovery of anadromous fish populations in the Hood River subbasin. This Habitat Protection, Restoration, and Monitoring Plan was prepared to advance the goals of the Hood River Production Program (HRRP) which include restoring self-sustaining runs of spring chinook salmon and winter and summer steelhead. The HRPP is a fish supplementation and monitoring and evaluation program initiated in 1991 and funded by the Bonneville Power Administration (BPA) as part of the Northwest Power Planning Council Fish and Wildlife Program. The HRPP is a joint effort of the Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO) and Oregon Department of Fish and Wildlife (ODFW). Using recent watershed assessment and federal watershed analysis reports, this Plan reviews the historic and current condition of riparian, instream and upland habitats; natural watershed processes; anadromous and resident fish populations; identifies limiting factors, and indicates those subbasin areas that need protection or are likely to respond to restoration. Primary habitat restoration needs were identified as (1) improved fish screening and upstream adult passage at water diversions; (2) improved spawning gravel availability, instream habitat structure and diversity; and (3) improved water quality and riparian conditions. While several early action projects have been initiated in the Hood River subbasin since the mid 1990s, this Plan outlines additional projects and strategies needed to protect existing high quality habitat, correct known fish survival problems, and improve the habitat capacity for natural production to meet HRPP goals.

  7. Baseline and Postremediation Monitoring Program Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report was prepared in accordance with CERCLA requirements to present the plan for baseline and postremediation monitoring as part of the selected remedy. It provides the Environmental Restoration Program with information about the requirements to monitor for soil and terrestrial biota in the Lower East Fork Poplar Creek (LEFPC) floodplain; sediment, surface water, and aquatic biota in LEFPC; wetland restoration in the LEFPC floodplain; and human use of shallow groundwater wells in the LEFPC floodplain for drinking water. This document describes the monitoring program that will ensure that actions taken under Phases I and II of the LEFPC remedial action are protective of human health and the environment.

  8. Water-Level Monitoring Plan for the Hanford Groundwater Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    D.R. Newcomer; J.P. McDonald; M.A. Chamness

    1999-09-30

    This document presents the water-level monitoring plan for the Hanford Groundwater Monitoring Project, conducted by the Pacific Northwest National Laboratory (PNNL). Water-level monitoring of the groundwater system beneath the Hanford Site is performed to fulfill the requirements of various state and federal regulations, orders, and agreements. The primary objective of this monitoring is to determine groundwater flow rates and directions. To meet this and other objectives, water-levels are measured annually in monitoring wells completed within the unconfined aquifer system, the upper basalt-confined aquifer system, and in the lower basalt-confined aquifers for surveillance monitoring. At regulated waste units, water levels are taken monthly, quarterly, semi-annually, or annually, depending on the hydrogeologic conditions and regulatory status of a given site. The techniques used to collect water-level data are described in this document along with the factors that affect the quality of the data and the strategies employed by the project to minimize error in the measurement and interpretation of water levels. Well networks are presented for monitoring the unconfined aquifer system, the upper basalt-confined aquifer system, and the lower basalt-confined aquifers, all at a regional scale (surveillance monitoring), as well as the local-scale well networks for each of the regulated waste units studied by this project (regulated-unit monitoring). The criteria used to select wells for water-table monitoring are discussed. It is observed that poor well coverage for surveillance water-table monitoring exists south and west of the 200-West Area, south of the 100-F Area, and east of B Pond and the Treated Effluent Disposal Facility (TEDF). This poor coverage results from a lack of wells suitable for water-table monitoring, and causes uncertainty in representation of the regional water-table in these areas. These deficiencies are regional in scale and apply to regions outside

  9. Cycle Monitors and Devices in Natural Family Planning

    Directory of Open Access Journals (Sweden)

    Freundl G

    2010-01-01

    Full Text Available For fertility awareness based methods- (FAB- users charting and checking of menstrual cycle symptoms may be supported by different instruments and devices. These cycle monitors promise to detect the fertile and infertile days by using direct and indirect markers of fertility in a woman´s menstrual cycle. In this article we use data of our own studies, data out of the literature research in Medline and PubMed and from our own German NFP (natural family planning database. We tried to rate the efficacy of the tested monitors. We figured out that only for one hormone- and for one temperature-computer reasonable prospective studies exist. To get more comparable results we have performed in 2000 a small pilot study on 6 devices and the symptothermal method of NFP (NFP-DAG together with “Stiftung Warentest”. The efficacy of the various devices differed significantly. We therefore urgently need more clinical studies on menstrual cycle monitors for reliable information of users.

  10. 75 FR 8745 - Notice of Intent To Prepare a Resource Management Plan Amendment and Associated Environmental...

    Science.gov (United States)

    2010-02-25

    ...; fisheries; archaeology and cultural resources; minerals, geology; forestry; lands and realty; soils... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan Amendment and Associated... Field Office, California intends to prepare an amendment to the Redding Resource Management Plan...

  11. Preparation of the NASA Air Quality Monitor for a U.S. Navy Submarine Sea Trial

    Science.gov (United States)

    Limero, Thomas; Wallace, William T.; Manney, Joshua A.; Smith, Matthew J.; O'Connor, Sara Jane; Mudgett, Paul D.

    2017-01-01

    For the past 4 years, the Air Quality Monitor (AQM) has been the operational instrument for measuring trace volatile organic compounds on the International Space Station (ISS). The key components of the AQM are the inlet preconcentrator, the gas chromatograph (GC), and the differential mobility spectrometer. Onboard the ISS are two AQMs with different GC columns that detect and quantify 22 compounds. The AQM data contributes valuable information to the assessment of air quality aboard ISS for each crew increment. The US Navy is looking to update its submarine air monitoring suite of instruments and the success of the AQM on ISS has led to a jointly planned submarine sea trial of a NASA AQM. In addition to the AQM, the Navy is also interested in the Multi-Gas Monitor (MGM), which measures major constituent gases (oxygen, carbon dioxide, water vapor, and ammonia). A separate paper will present the MGM sea trial preparation and the analysis of most recent ISS data. A prototype AQM, which is virtually identical to the operational AQM, has been readied for the sea trial. Only one AQM will be deployed during the sea trial, but this is sufficient for NASA purposes and to detect the compounds of interest to the US Navy for this trial. The data from the sea trial will be compared to data from archival samples collected before, during, and after the trial period. This paper will start with a brief history of past collaborations between NASA and the U.S. and U.K. navies for trials of air monitoring equipment. An overview of the AQM technology and protocols for the submarine trial will be presented. The majority of the presentation will focus on the AQM preparation and a summary of available data from the trial.

  12. Plan for a groundwater monitoring network in Taiwan

    Science.gov (United States)

    Hsu, Shiang-Kueen

    In Taiwan, rapid economic growth, rising standards of living, and an altered societal structure have in recent years put severe demands on water supplies. Because of its stable quantity and quality, groundwater has long been a reliable source of water for domestic, agricultural, and industrial users, but the establishment of a management program that integrates groundwater and surface-water use has been hampered by the lack of groundwater data. In 1992, the Department of Water Resources (DWR) initiated a program entitled "Groundwater Monitoring Network Plan in Taiwan." Under this program, basic groundwater data, including water-level and water-quality data, are being collected, and a reliable database is being established for the purpose of managing total water resources. This paper introduces the goals, implementation stages, and scope of that plan. The plan calls for constructing 517 hydrogeologic survey stations and 990 groundwater monitoring wells within 17 years. Under this program, water-level fluctuations are continuously monitored, whereas water-quality samples are taken for analysis only at the initial drilling stage and, subsequently, at the time when a monitoring well is being serviced. In 1996, the DWR and the Water Resources Planning Commission were merged to form today's Water Resources Bureau. Résumé A Taïwan, l'expansion économique rapide, l'amélioration des conditions de vie et la transformation de la structure sociale ont provoqué, ces dernières années, une très forte demande en eau. Du fait de sa constance en qualité et en quantité, l'eau souterraine a longtemps été considérée comme une ressource en eau sûre pour les usages domestiques, agricoles et industriels. Mais la mise en place d'un programme de gestion intégrant les utilisations d'eaux souterraines et de surface a été gênée par l'absence de données sur les eaux souterraines. En 1992, le Département des Ressources en Eau a lancé le programme "Plan pour un réseau de

  13. Strategic planning: preparing for the twenty-first century.

    Science.gov (United States)

    Andrews, M M

    1990-01-01

    If educational institutions for nursing are to survive these uncertain times and to experience new life in the advent of the 21st century, careful planning for the future must be undertaken. Strategic planning, a relatively new term in nursing education, is a concept designed to achieve goals in dynamic, competitive environments through the judicious allocation of resources. The primary purpose of strategic planning is to achieve success with mission while linking the institution's future to anticipated changes in the environment. Strategic planning enables an institution to function in such a manner that the acquisition of resources exceeds their depletion. The purposes of this article are to (1) provide an overview of the strategic planning process and (2) describe the strategic planning experience of one private, liberal arts college in a midwestern state. Although the case example focuses on a liberal arts college, the strategic planning process is applicable to other types of educational settings.

  14. Great River & Clarence Cannon National Wildlife Refuges Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan for Clarence Cannon and Great River National Wildlife Refuges is a step-down from the Habitat Management Plan (HMP) and documents...

  15. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    Science.gov (United States)

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  16. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    Science.gov (United States)

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  17. Final Restoration and Mitigation Monitoring Plan for the Island Ponds Restoration Project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Restoration and Mitigation Monitoring Plan (RMMP) presents the approaches necessary to satisfy mitigation and monitoring requirements described in the various...

  18. 76 FR 16795 - The National Antimicrobial Resistance Monitoring System Strategic Plan 2011-2015; Request for...

    Science.gov (United States)

    2011-03-25

    ... HUMAN SERVICES Food and Drug Administration The National Antimicrobial Resistance Monitoring System... National Antimicrobial Resistance Monitoring System (NARMS) entitled ``NARMS Strategic Plan 2011-2015... obtain documents at either http://www.fda.gov/AnimalVeterinary/SafetyHealth/AntimicrobialResistance...

  19. Business Continuity Planning for Nursing Schools: Preparation for Potential Disasters.

    Science.gov (United States)

    Zerwic, Julie J; Rosen, Denise

    2016-01-01

    Nursing schools are vulnerable to disasters, ranging from pandemics to weather emergencies, fires, and acts of terrorism. To ensure minimal disruptions to teaching, provision of care, research, and other critical missions, nursing faculty and administrative leaders should develop a business continuity plan. The business continuity plan can help faculty, students, and administration identify critical functions and alternative plans if an emergency occurs. We offer our experience as a guide for other nursing schools.

  20. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

  1. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

  2. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).

  3. Technology-Based Lesson Plans: Preparation and Description

    Science.gov (United States)

    Kubilinskiene, Svetlana; Dagiene, Valentina

    2010-01-01

    A lesson plan is an important methodological component of the learning process. The key purpose of the article is to analyse the current situation and suggest how the information technologies can assist in the development of lesson plans, their accumulation and retrieval, thus ensuring their effective application. The authors disclose the problems…

  4. Hierarchical Bayesian spatial models for multispecies conservation planning and monitoring.

    Science.gov (United States)

    Carroll, Carlos; Johnson, Devin S; Dunk, Jeffrey R; Zielinski, William J

    2010-12-01

    Biologists who develop and apply habitat models are often familiar with the statistical challenges posed by their data's spatial structure but are unsure of whether the use of complex spatial models will increase the utility of model results in planning. We compared the relative performance of nonspatial and hierarchical Bayesian spatial models for three vertebrate and invertebrate taxa of conservation concern (Church's sideband snails [Monadenia churchi], red tree voles [Arborimus longicaudus], and Pacific fishers [Martes pennanti pacifica]) that provide examples of a range of distributional extents and dispersal abilities. We used presence-absence data derived from regional monitoring programs to develop models with both landscape and site-level environmental covariates. We used Markov chain Monte Carlo algorithms and a conditional autoregressive or intrinsic conditional autoregressive model framework to fit spatial models. The fit of Bayesian spatial models was between 35 and 55% better than the fit of nonspatial analogue models. Bayesian spatial models outperformed analogous models developed with maximum entropy (Maxent) methods. Although the best spatial and nonspatial models included similar environmental variables, spatial models provided estimates of residual spatial effects that suggested how ecological processes might structure distribution patterns. Spatial models built from presence-absence data improved fit most for localized endemic species with ranges constrained by poorly known biogeographic factors and for widely distributed species suspected to be strongly affected by unmeasured environmental variables or population processes. By treating spatial effects as a variable of interest rather than a nuisance, hierarchical Bayesian spatial models, especially when they are based on a common broad-scale spatial lattice (here the national Forest Inventory and Analysis grid of 24 km(2) hexagons), can increase the relevance of habitat models to multispecies

  5. Succession planning and the physician practice: is your practice prepared?

    Science.gov (United States)

    Deeson, Jon-David

    2007-01-01

    Managing the day-to-day operational issues of a medical practice can consume the focus of practice management, while planning for future events such as physician retirement or end-of-career decisions typically earn a lower ranking. Succession planning can play a crucial role in equipping both the individual physician, as well as the group practice, with a successful physician practice environment for the future. In this article, we will explore four key reasons physician practices need to have an effective succession plan in place.

  6. T Tank Farm Interim Surface Barrier Demonstration--Vadose Zone Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F.; Keller, Jason M.; Strickland, Christopher E.

    2007-04-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim barrier on the surface. Such a barrier is expected to prevent infiltrating water from reaching the plume and moving it further. A plan has been prepared to monitor and determine the effectiveness of the interim surface barrier. Soil water content and water pressure will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests were installed. Each instrument nest contains a neutron probe access tube, a capacitance probe, four heat-dissipation units, and a drain gauge to measure soil water flux. A meteorological station has been installed outside of the fence. In fiscal year 2007, two additional instrument nests are planned to be installed beneath the proposed barrier.

  7. Standard Guide for Preparing Characterization Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This standard guide applies to developing nuclear facility characterization plans to define the type, magnitude, location, and extent of radiological and chemical contamination within the facility to allow decommissioning planning. This guide amplifies guidance regarding facility characterization indicated in ASTM Standard E 1281 on Nuclear Facility Decommissioning Plans. This guide does not address the methodology necessary to release a facility or site for unconditional use. This guide specifically addresses: 1.1.1 the data quality objective for characterization as an initial step in decommissioning planning. 1.1.2 sampling methods, 1.1.3 the logic involved (statistical design) to ensure adequate characterization for decommissioning purposes; and 1.1.4 essential documentation of the characterization information. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate saf...

  8. 75 FR 18757 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Science.gov (United States)

    2010-04-13

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring Requirements for Indianapolis Power and Light--Harding Street Station AGENCY: Environmental... approve as ] a revision to its State Implementation Plan (SIP) alternative monitoring requirements for...

  9. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  10. STRATEGY AND PLANNING - PROJECT FOR MONITORING STRICTO SENSU POSTGRADUATE ALUMNI

    Directory of Open Access Journals (Sweden)

    Emerson Antonio Maccari

    2014-07-01

    Full Text Available The Coordination of Improvement of Higher Education Personnel (CAPES has been contributing to the development of post-graduate studies in Brazil, through its system of evaluation. Lately, CAPES signaled the importance of follow the professional performance of the alumni as a way to measure the quality of courses. One difficulty reported by institutions that intend to recognize the trajectory of its graduates is to compile a lot of isolated and outdated data. In order to structure the data collection and to assist educational managers in decision making, we propose the development of a system that enables the evolution of the students and alumni professional career, in order to diagnose the influence of the courses. Based on literature review, this study presents an analysis and makes recommendations about the Monitoring Alumni Project planning. As a result, it is expected that the analysis will serve as a driver for conducting the project, aiming to contribute to the academic reflections, and in practice, contribute to improve educational projects quality.

  11. Monitoring Teams by Overhearing: A Multi-Agent Plan-Recognition Approach

    CERN Document Server

    Kaminka, G A; Tambe, M; 10.1613/jair.970

    2011-01-01

    Recent years are seeing an increasing need for on-line monitoring of teams of cooperating agents, e.g., for visualization, or performance tracking. However, in monitoring deployed teams, we often cannot rely on the agents to always communicate their state to the monitoring system. This paper presents a non-intrusive approach to monitoring by 'overhearing', where the monitored team's state is inferred (via plan-recognition) from team-members' routine communications, exchanged as part of their coordinated task execution, and observed (overheard) by the monitoring system. Key challenges in this approach include the demanding run-time requirements of monitoring, the scarceness of observations (increasing monitoring uncertainty), and the need to scale-up monitoring to address potentially large teams. To address these, we present a set of complementary novel techniques, exploiting knowledge of the social structures and procedures in the monitored team: (i) an efficient probabilistic plan-recognition algorithm, well...

  12. Application of a power quality analyser to the monitoring of sand preparation processes in foundry plants

    Directory of Open Access Journals (Sweden)

    K. Smyksy

    2011-10-01

    Full Text Available Process control plays a major role in supervision and identification of states, for example in monitoring of electric circuits power- supplying the foundry machines and devices, such as sand preparation processes, moulding technologies, melting, cleaning and finishing of castings. The monitoring and control equipment includes the power quality analysers. Testing is done using a Japanese analyser KEW 6319 (Kyoritsu applied to monitoring of the sand preparation process in a foundry plant with low level of mechanization, equipped with the sand preparation unit based on a roller mixer.

  13. New Standards for the Preparation of School Administrators: What Conceptualization of Educational Planning Do They Portray?

    Science.gov (United States)

    Beach, Robert H.; Lindahl, Ronald A.

    2000-01-01

    Describes school administrator preparation standards, especially those related to planning, developed by the Interstate School Leadership Licensure Consortium, a joint effort of the Council of Chief State School Officers and the National Policy Board for Educational Administration. Includes overview of planning models and analysis of knowledge…

  14. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Science.gov (United States)

    2010-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern,...

  15. University Strategic Planning: A Process for Change in a Principal Preparation Program

    Science.gov (United States)

    Guerra, Federico R.; Zamora, Roberto; Hernandez, Rosalinda; Menchaca, Velma

    2017-01-01

    This study describes a strategic planning process used for developing an educational leadership program that prepares principals for leading 21st century schools. The plan is based on recommendations received from the External reviewers representing Southern Association of Colleges and Schools, the Texas Education Agency, survey responses received…

  16. Teachers' Planning and Preparation for Lesson Plan in the Implementation of Form 4 Physical Education Curriculum for the Physical Fitness Strand

    Science.gov (United States)

    Ali, Syed Kamaruzaman Syed

    2013-01-01

    This article is related to the study of lesson planning prepared by secondary school Physical Education teachers in the Gombak district. Findings of the study show that Physical Education teachers have prepared lesson plans at satisfactory level (M = 4.13; SD = 0.79). All elements within the lesson planning components achieved high mean scores.…

  17. Preparing tomorrow's leaders through succession planning from the provider perspective.

    Science.gov (United States)

    Noyes, Betty; McNally, Kimberly; Tourville, Sharon; Robinson, Pati

    2002-12-01

    "We never know.... Fate has a way of showing up at the most inopportune times. We had been planning for Ann's retirement for months. It was going to be a loss. Not only was she a long-term employee and strong manager, she could step in and lead anything. She would be sorely missed. We knew who was going to cover each of her areas of accountability. Sue would take one unit. John would manage the Dialysis Program. We had completed a job analysis, and everything was covered. We had already begun the shifting of accountabilities. September 2 was the big day. We had 3 months to go. Then the big opportunity came. We had been working on the merger for months before it finally happened. There was only one glitch. The culture shift was going to be huge. We needed someone to lead the process. Of course, who could do it better than Ann? She had been leading change for years. She was a master. She had the one skill for which we had no succession plan. We had one person that we could call, and within 3 months she would be gone. We had missed the mark. We had not completed our succession plan." These real-life stories show how critical succession planning can be to an organization. To do it well requires a clear vision of the strategic objectives of the organization, focused development programs, and continuous enrollment of both executives and employees within the organization. Leadership training, learning projects, and creating a coaching environment also are crucial elements of a successful succession plan.

  18. Universities prepare as physicists plan to pop protons

    CERN Multimedia

    2007-01-01

    "The world's largest science experiment, a physics experiment designed to determine the nature of matter, will produce a mountain of data. And because the world's physicists cannot move to the mountain, an army of computer research scientists is preparing to move the mountain to the physicists." (3 pages)

  19. Final monitoring plan for site restoration at Murdock, Nebraska.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2006-02-28

    In early 2005, Argonne National Laboratory conducted an Engineering Evaluation/Cost Analysis (EE/CA; Argonne 2005b) to address carbon tetrachloride contamination identified in groundwater and surface water at Murdock, Nebraska, approximately 22 mi east-northeast of Lincoln (Figure 1.1). The EE/CA study was performed for the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA), as the technical basis for a proposed removal action for the Murdock site. The EE/CA was conducted in compliance with an Administrative Order on Consent issued for Murdock by the U.S. Environmental Protection Agency (EPA 1991). Three removal action alternatives were examined through the use of site-specific data and predictive simulations of groundwater flow and contaminant transport performed with calibrated numerical models. The alternatives were evaluated individually and compared against performance criteria established under the National Oil and Hazardous Substances Pollution Contingency Plan and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). On the basis of these evaluations, an alternative employing phytoremediation in conjunction with seasonal groundwater extraction and treatment by spray irrigation was recommended by the CCC/USDA to permanently reduce the carbon tetrachloride contaminant levels in groundwater and surface water at the site. The proposed alternative is being implemented in cooperation with the EPA. Under the direction of the CCC/USDA and the EPA, implementation of the chosen removal action occurred in phases, beginning in April 2005. Installation of all the required remediation systems was completed by the end of August 2005. Specific technical objectives of the removal action are as follows: (1) To eliminate pathways for potential human exposure to carbon tetrachloride concentrations above the regulatory limit of 44.2 {micro}g/L in surface water at the site. (2) To minimize or eliminate any detrimental

  20. An inventory and monitoring plan for a Sonoran Desert ecosystem; Barry M. Goldwater Range-West

    Science.gov (United States)

    Villarreal, Miguel L.; van Riper, Charles; Lovich, Robert E.; Palmer, Robert L.; Nauman, Travis; Studd, Sarah E.; Drake, Sam; Rosenberg, Abigail S.; Malusa, Jim; Pearce, Ronald L.

    2011-01-01

    Marine Corps Air Station Yuma manages the Barry M. Goldwater Range-West, which encompasses approximately 2,800 square kilometers of Sonoran Desert habitat in southwestern Arizona. The Barry M. Goldwater Range is a major U.S. military installation designed as an air combat training location for the U.S. Marine Corps and U.S. Air Force, but it also includes some of the most pristine desert habitat in the United States. In an effort to ensure the long-term viability of this unique natural resource, the U.S. Geological Survey (USGS) has developed an Integrated Natural Resources Management Plan and Inventory and Monitoring Plan to guide natural resource management of the Barry M. Goldwater Range-West. This Inventory and Monitoring Plan provides a framework for long-term ecosystem monitoring on Barry M. Goldwater Range-West lands by identifying existing and potential threats to ecosystem function, prioritizing resources for monitoring, and providing information and protocols necessary to initiate a long-term ecosystem monitoring program. The Inventory and Monitoring Plan and related protocols were developed through extensive review of existing Sonoran Desert monitoring programs and monitoring literature and through a 2-day workshop with resource managers, monitoring experts, and other stakeholders. The Barry M. Goldwater Range-West Inventory and Monitoring Plan stresses the importance of regional monitoring partnerships and protocol standardization for understanding landscape-scale ecosystem changes in the Sonoran Desert; information and protocols contained within the plan may also be of interest to land managers engaged in large-scale ecosystem monitoring and adaptive management of other arid regions.

  1. Environmental Contaminants Monitoring Plan for Stillwater National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This environmental contaminants monitoring program is designed to assess concentrations, distribution, and biological availability of environmental contaminants on...

  2. Y-12 Groundwater Protection Program Monitoring Well Inspection And Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for:  inspecting the physical condition of monitoring wells at Y-12,  determining maintenance needs that extend the life of a well, and  identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment.

  3. Y-12 Groundwater Protection Program Monitoring Well Inspection And Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for:  inspecting the physical condition of monitoring wells at Y-12,  determining maintenance needs that extend the life of a well, and  identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment.

  4. A Plan-Do-Study-Act Approach to Improving Bowel Preparation Quality.

    Science.gov (United States)

    Calderwood, Audrey H; Mahoney, Elaine M; Jacobson, Brian C

    Up to 20% of patients presenting for colonoscopy have inadequate bowel cleanliness. In this study, the Plan-Do-Study-Act quality improvement process was used to improve bowel cleanliness among outpatients undergoing screening colonoscopy at Boston Medical Center. Rates of inadequate bowel cleanliness were assessed at baseline (April 2010 to September 2012), during several rapid-cycle experiments (October 2012 to September 2013), and through an observation phase (October 2013 to September 2015). The baseline rate of inadequate cleanliness was 9% with a target of 5%. Gap analysis identified 3 areas amenable to specific interventions: contacting patients, commitment to the procedure, and complexity and variation in instructions. Rates of inadequate cleanliness decreased to 4% at the end of the last intervention, but began rising for new reasons. Standardizing instructions and the use of navigators improved preparation quality. Bowel cleanliness is the end result of a multistep process with areas for improvement at many levels. Long-term monitoring is required to ensure ongoing success.

  5. Monitoring well plugging and abandonment plan, Y-12 Plant, Oak Ridge, Tennessee (revised)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Plugging and abandonment (P&A) of defunct groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP) (AJA Technical Services, Inc. 1996). This document is the revised groundwater monitoring well P&A plan for the U.S. Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan describes the systematic approach employed by Y-12 Plant GWPP to identify wells that require P&A, the technical methods employed to perform P&A activities, and administrative requirements. Original documentation for Y-12 Plant GWPP groundwater monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A schedule be maintained. Wells are added to this list by issuance of both a P&A request and a P&A addendum to the schedule. The current Updated Subsurface Data Base includes a single mechanism to track the status of monitoring wells. In addition, rapid growth of the groundwater monitoring network and new regulatory requirements have resulted in constant changes to the status of wells. As a result, a streamlined mechanism to identify and track monitoring wells scheduled for P&A has been developed and the plan revised to formalize the new business practices.

  6. 75 FR 39916 - Endangered and Threatened Species; Notice of Intent to Prepare a Recovery Plan for the Sei Whale

    Science.gov (United States)

    2010-07-13

    ... Intent to Prepare a Recovery Plan for the Sei Whale AGENCY: National Marine Fisheries Service (NMFS... its intent to prepare a recovery plan for the Sei Whale (Balaenoptera borealis) and requests... ``Sei Whale Recovery Plan Information'' 3. Mail: National Marine Fisheries Service, Office of...

  7. Inventory and Monitoring 7-Year Plan: 2013-2020 For the National Wildlife Refuge System

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring 7-Year Plan outlines how the National Wildlife Refuge System is implementing a nationally coordinated effort to support rigorous...

  8. Groundwater monitoring plan for the proposed state-approved land disposal structure

    Energy Technology Data Exchange (ETDEWEB)

    Reidel, S.P.

    1993-10-13

    This document outlines a detection-level groundwater monitoring program for the state-approved land disposal structure (SALDS). The SALDS is an infiltration basin proposed for disposal of treated effluent from the 200 Areas of the Hanford Site. The purpose of this plan is to present a groundwater monitoring program that is capable of determining the impact of effluent disposal at the SALDS on the quality of groundwater in the uppermost aquifer. This groundwater monitoring plan presents an overview of the SALDS, the geology and hydrology of the area, the background and indicator evaluation (detection) groundwater monitoring program, and an outline of a groundwater quality assessment (compliance) program. This plan does not provide a plan for institutional controls to track tritium beyond the SALDS.

  9. National Wildlife Refuge System Region 7 Inventory and Monitoring Regional Annual Work Plan Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 7 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  10. Region 1 National Wildlife Refuge System Inventory and Monitoring Program : Annual Work Plan : Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 1 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  11. Inventory and Monitoring Plan for Little Pend Oreille National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents and prioritizes inventory and monitoring surveys and research currently conducted, and proposed to be conducted, at the Little Pend Oreille...

  12. Pacific Southwest Region Inventory & Monitoring Initiative: Annual Work Plan FY 2013

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  13. Pacific Southwest Region Inventory & Monitoring Initiative: Annual Work Plan FY 2014

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  14. Pacific Southwest Region Inventory & Monitoring Initiative: Annual Work Plan FY 2015

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  15. Pacific Southwest Region Inventory & Monitoring Initiative: Annual Work Plan FY 2016

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  16. Natural Resource Program Center Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the National Wildlife Refuge System I present vision and objectives for regional inventory and monitoring initiative, staffing, planned activities and...

  17. Inventory and Monitoring Plan for Kanuti National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This IMP provides the rationale for the ranking and selection of surveys that Kanuti NWR intends to conduct over the life of the plan (about 10 years), and briefly...

  18. Facility Effluent Monitoring Plan for the Waste Receiving and Processing (WRAP) Facility

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, W.E.

    2000-03-08

    A facility effluent monitoring plan is required by the U.S. Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee public safety, or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan ensures long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and must be updated, as a minimum, every 3 years.

  19. Alaska Regional Refuge Inventory and Monitoring Strategic Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Alaska Inventory and Monitoring team (I Message-ID: ). Alaska Region I&M Team members: Anna-Marie Benson , Greta Burkart , McCrea Cobb , Carol Damberg ,...

  20. sampling plans for monitoring quality control process at a plastic ...

    African Journals Online (AJOL)

    Dr Obe

    managing these -activities in an intercultural environment will be of increasing ... adoption of new managerial concepts and .techniques among ... sample for both monitoring and quality control purposes. Prybrutok, et al. 7 observed that the.

  1. A plan for the North American Bat Monitoring Program (NABat)

    Science.gov (United States)

    Loeb, Susan C.; Rodhouse, Thomas J.; Ellison, Laura E.; Lausen, Cori L.; Reichard, Jonathan D.; Irvine, Kathryn M.; Ingersoll, Thomas E.; Coleman, Jeremy; Thogmartin, Wayne E.; Sauer, John R.; Francis, Charles M.; Bayless, Mylea L.; Stanley, Thomas R.; Johnson, Douglas H.

    2015-01-01

    The purpose of the North American Bat Monitoring Program (NABat) is to create a continent-wide program to monitor bats at local to rangewide scales that will provide reliable data to promote effective conservation decisionmaking and the long-term viability of bat populations across the continent. This is an international, multiagency program. Four approaches will be used to gather monitoring data to assess changes in bat distributions and abundances: winter hibernaculum counts, maternity colony counts, mobile acoustic surveys along road transects, and acoustic surveys at stationary points. These monitoring approaches are described along with methods for identifying species recorded by acoustic detectors. Other chapters describe the sampling design, the database management system (Bat Population Database), and statistical approaches that can be used to analyze data collected through this program.

  2. Inventory and Monitoring Plan for Yukon Flats National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This IMP prioritizes and describes the inventory, monitoring, and research surveys to be conducted on the Yukon Flats NWR over the next 10 years, based on guidance...

  3. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans.

  4. Business Continuity Planning : Responding to an Influenza Pandemic, Advice to Businesses on Preparing for a Pandemic

    OpenAIRE

    Cronin, Martin; Shanagher, Martin; Barry, Richard; O'Toole, Breda; Burbridge, Martin; Hedigan, David; Hughes, Declan; Dagg, Maurice; Gregg, Con; Faulkner, Randal

    2009-01-01

    Business Continuity Planning is increasingly part of normal business practice. Recent acts of terrorism, outbreaks of Severe Acute Respiratory Syndrome (SARS) and the Avian Flu, and various widespread natural disasters have served to highlight the importance of business continuity planning by underlining the substantial risk of major operational disruptions for businesses. Best practice is for companies to prepare for a range of eventualities and risks which threaten business continuity. This...

  5. 77 FR 40860 - Strategic Plan for Federal Research and Monitoring of Ocean Acidification

    Science.gov (United States)

    2012-07-11

    ... Monitoring of Ocean Acidification AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and... Ocean Acidification is being made available for public review and comment. The Draft Research Plan... section 12405 of the Federal Ocean Acidification Research And Monitoring Act of 2009, 33 U.S.C. 3701-3708...

  6. Monitoring well inspection and maintenance plan Y-12 Plant, Oak Ridge, Tennessee (revised)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Inspection and maintenance of groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP). This document is the revised groundwater monitoring well inspection and maintenance plan for the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The plan provides a systematic program for: (1) inspecting the physical condition of monitoring wells at the Y-12 Plant and (2) identifying maintenance needs that will extend the life of each well and ensure that representative groundwater quality samples and hydrologic data are collected from the wells. Original documentation for the Y-12 Plant GWPP monitoring well inspection and maintenance program was provided in HSW, Inc. 1991a. The original revision of the plan specified that only a Monitoring Well Inspection/Maintenance Summary need be updated and reissued each year. Rapid growth of the monitoring well network and changing regulatory requirements have resulted in constant changes to the status of wells (active or inactive) listed on the Monitoring Well Inspection/Maintenance Summary. As a result, a new mechanism to track the status of monitoring wells has been developed and the plan revised to formalize the new business practices. These changes are detailed in Sections 2.4 and 2.5.

  7. Assessment groundwater monitoring plan for single shell tank waste management area B-BX-BY

    Energy Technology Data Exchange (ETDEWEB)

    Caggiano, J.A.

    1996-09-27

    Single Shell Tank Waste Management Area B-BX-BY has been placed into groundwater quality assessment monitoring under interim-status regulations. This document presents background and an assessment groundwater monitoring plan to evaluate any impacts of risks/spills from these Single Shell Tanks in WMA B-BX-BY on groundwater quality.

  8. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  9. 78 FR 42970 - Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior...

    Science.gov (United States)

    2013-07-18

    ... existing 1981 Southwest Planning Area Management Framework Plan and portions of the 1986 Central Yukon RMP..., Evaluation, Planning, and Management; 15. The BLM will incorporate Environmental Justice considerations in... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan for the Bering Sea...

  10. Guide to preparation of Department of Energy procurement and financial assistance planning forms

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    A procurement and federal assistance planning system is vital to effective and efficient management of the Department of Energy's mission. The planning system is essential to the procurement and Federal assistance process. It gives Departmental managers and the procurement community information on how DOE plans to do business in the next fiscal year as well as the extent of competition in the Departmental procurement process. Planning information is used to forecast procurement workload and plans for increased competition. Good planning can be a tool to efficiently manage resources in order to expedite the timely acquisition of equipment and contractual services and continue the Department's mission. Planning is the first step in the procurement and financial assistance process and the Integrated Procurement Management Information System (IPMIS). Therefore, it is essential that planning forms are accurately completed and updated to provide the initial source data for planned procurement and assistance transactions. The complete Guide to Preparation of Department of Energy Procurement and Financial Assistance Planning Forms was revised to incorporate the latest changes in IPMIS. This Guide and a memorandum which officially requests DOE offices to submit planning forms for all planned procurement and assistance transactions provide instructions for completing the forms and other information relative to fulfilling this requirement. The planning forms are DOE F-4200.6, DOE-F-4200.7 and DOE-F-4200.8. These forms and this Guide can be obtained from any Headquarters supply store, regional offices, operations offices, energy research centers, project offices and power administrations.

  11. Interim Status Groundwater Monitoring Plan for Low-Level Waste Management Areas 1 to 4, RCRA Facilities, Hanford,Washington

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P Evan

    2004-10-25

    This document describes the monitoring plan to meet the requirements for interim status groundwater monitoring at Hanford Site low-level waste burial grounds as specified by 40 CFR 265, incorporated by reference in WAC 173-303-400. The monitoring will take place at four separate low-level waste management areas in the 200-West and 200-East Areas, in the central part of the site. This plan replaces the previous monitoring plan.

  12. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Science.gov (United States)

    2010-01-01

    ... forecast. Examples of internal uses include providing information for developing or monitoring demand side management programs, supply resource planning, load flow studies, wholesale power marketing, retail...

  13. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    Energy Technology Data Exchange (ETDEWEB)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

  14. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    Energy Technology Data Exchange (ETDEWEB)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

  15. Standard Guide for Environmental Monitoring Plans for Decommissioning of Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide covers the development or assessment of environmental monitoring plans for decommissioning nuclear facilities. This guide addresses: (1) development of an environmental baseline prior to commencement of decommissioning activities; (2) determination of release paths from site activities and their associated exposure pathways in the environment; and (3) selection of appropriate sampling locations and media to ensure that all exposure pathways in the environment are monitored appropriately. This guide also addresses the interfaces between the environmental monitoring plan and other planning documents for site decommissioning, such as radiation protection, site characterization, and waste management plans, and federal, state, and local environmental protection laws and guidance. This guide is applicable up to the point of completing D&D activities and the reuse of the facility or area for other purposes.

  16. Issues and dilemmas in preparation and implementation of the spatial plan of the municipality

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2012-01-01

    Full Text Available Disadvantages of the Serbian planning system and dilemmas about the role of spatial planning in Serbia mainly is reflected at the local level of spatial planning. The focus of the spatial plan of the municipality from the strategic to regulatory role has been shifted by the changes of legal basis. In this paper the key issues and dilemmas in the practice of preparation and implementation of the spatial plan of the municipality in Serbia are pointed out. The review of the three key issues of importance for the direct implementation of planning solutions and concepts: identification of the construction zone, the establishment of rules for the protection, arrangement and construction of physical (natural, landscape and functional entities and settlements, and elaboration of arrangement scheme for the settlement are presented. It has still not made clear what the arrangement scheme for the settlement should represent, so that in practice there is wide variety of schemes, usually completely unenforceable. Good examples of arrangement schemes elaboration within spatial plan of the municipality have been presented and analyzed. Suggestions for improving the content of the strategic and regulatory elements of the spatial plan of the municipality, as well as recommendations to the basic content of the arrangement scheme for settlement as a part of this spatial plan are proposed.

  17. Preparing a paper for publication: an action plan for rapid composition and completion

    NARCIS (Netherlands)

    Harvey, J.A.

    2009-01-01

    An important challenge for scientists, especially those early in their careers, is preparing an effective article for submission to a peer-reviewed journal. Here, I present a number of suggestions on how it could be accomplished. This action plan addresses (1) how to approach a topic by developing a

  18. Road to Success: Helping Young Adults with Learning Disabilities Plan and Prepare for Employment

    Science.gov (United States)

    Johnson, D. Richard; Mellard, Daryl F.; Lancaster, Paula

    2007-01-01

    This article reviews "Road to Success" as a curricular innovation that addresses needs of adolescents with learning disabilities (LD) as they transition from school to employment or postsecondary educational settings. A variety of curricula exist for aiding the general populace of job seekers in planning and preparing for employment, but few exist…

  19. Measuring Parent Time Scarcity and Fatigue as Barriers to Meal Planning and Preparation: Quantitative Scale Development

    Science.gov (United States)

    Storfer-Isser, Amy; Musher-Eizenman, Dara

    2013-01-01

    Objective: To examine the psychometric properties of 9 quantitative items that assess time scarcity and fatigue as parent barriers to planning and preparing meals for their children. Methods: A convenience sample of 342 parents of children aged 2-6 years completed a 20-minute online survey. Exploratory factor analysis was used to examine the…

  20. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-12-01

    This document is the third revision of the 'Monitoring Well Inspection and Maintenance Plan' for groundwater wells associated with the US Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: (1) inspecting the physical condition of monitoring wells at Y-12; (2) identifying maintenance needs that extend the life of the well and assure well-head protection is in place, and (3) identifying wells that no longer meet acceptable monitoring-well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, 'proactive stewardship of the extensive monitoring well network at Y-12' (BWXT 2004a). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality monitoring and hydrologic data are able to be obtained from the well network. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (BWXT 2006b), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data. This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime); (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime); and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of the

  1. 1996 monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites was near the town of Gunnison, Colorado. Surface remediation was completed at the Gunnison site in December 1995. Remedial action resulted in the elimination of 4.3 acres of wetlands and mitigation of this loss is through the enhancement of 17.8 acres of riparian plant communities in six spring-fed areas on US Bureau of Land Management mitigation sites. A five-year monitoring program was then implemented to document the response of vegetation and wildlife to the exclusion of livestock. This report provides the results of the third year of the monitoring program.

  2. Defense Coastal/Estuarine Research Program (DCERP) Baseline Monitoring Plan

    Science.gov (United States)

    2007-09-19

    species, such as the seabeach amaranth , may even be enhanced by such perturbations. The dune and shrub plants of the coastal barrier suffer...sampling and modeling to determine the wetland areas at greatest risk and where mitigation may be needed. Species at Risk - beach amaranth Coastal...Species Sea beach amaranth surveys Annual Log book/GIS layer Wetlands (training areas monitored for impacts) Ongoing Log book/spreadsheet Training

  3. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    Pentecost, E.D.; Vinikour, W.S. [Argonne National Lab., IL (United States)

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods.

  4. Best management practices plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This Best Management Practices (BMP) Plan has been developed as part of the environmental monitoring program at Waste Area Grouping (WAG) 6. The BMP Plan describes the requirements for personnel training, spill prevention and control, environmental compliance, and sediment/erosion control as they relate to environmental monitoring activities and installation of Monitoring Station 4 at WAG 6.

  5. Maintenance Planning of Offshore Wind Turbine using Condition Monitoring Information

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    incorporating CMI, addressing this analysis to fatigue prone details in welded steel joints at jacket or tripod steel support structures for offshore wind turbines. The increase of turbulence in wind farms is taken into account by using a code-based turbulence model. Further, additional modes t integrate CMI...... in the RBI approach for optimal planning of inspection and maintenance. As part of the results, the life cycle reliabilities and inspection times are calculated, showing that earlier inspections are needed at in-wind farm sites. This is expected due to the wake turbulence increasing the wind load...

  6. Assessing and Monitoring Student Progress in an E-Learning Personnel Preparation Environment.

    Science.gov (United States)

    Meyen, Edward L.; Aust, Ronald J.; Bui, Yvonne N.; Isaacson, Robert

    2002-01-01

    Discussion of e-learning in special education personnel preparation focuses on student assessment in e-learning environments. It includes a review of the literature, lessons learned by the authors from assessing student performance in e-learning environments, a literature perspective on electronic portfolios in monitoring student progress, and the…

  7. 79 FR 41594 - Notice of Intent To Amend the 1999 Owyhee Resource Management Plan and Prepare an Associated...

    Science.gov (United States)

    2014-07-16

    ... Bureau of Land Management Notice of Intent To Amend the 1999 Owyhee Resource Management Plan and Prepare... Management (BLM) Owyhee Field Office, Marsing, Idaho, intends to prepare a Resource Management Plan (RMP) amendment with an associated Environmental Assessment (EA) for the Owyhee Field Office. This...

  8. Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made.

  9. Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made.

  10. Groundwater level monitoring sampling and analysis plan for the environmental monitoring plan at waste area grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document is the Groundwater Level Monitoring Sampling and Analysis Plan (SAP) for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). Note that this document is referred to as a SAP even though no sampling and analysis will be conducted. The term SAP is used for consistency. The procedures described herein are part of the Environmental Monitoring Plan (EMP) for WAG 6, which also includes monitoring tasks for seeps and springs, groundwater quality, surface water, and meteorological parameters. Separate SAPs are being issued concurrently to describe each of these monitoring programs. This SAP has been written for the use of the field personnel responsible for implementation of the EMP, with the intent that the field personnel will be able to take these documents to the field and quickly find the appropriate steps required to complete a specific task. In many cases, Field Operations Procedures (FOPs) will define the steps required for an activity. The FOPs for the EMP are referenced and briefly described in the relevant sections of the SAPs, and are contained within the FOP Manual. Both these documents (the SAP and the FOP Manual) will be available to personnel in the field.

  11. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    Energy Technology Data Exchange (ETDEWEB)

    Richard P. Wells

    2007-03-23

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year.

  12. Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This document presents the Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG) 6 at the Oak Ridge National Laboratory (ORNL). Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and on subsequent discussions with regulators, a decision was made to defer implementing source control remedial measures at the WAG. The alternative selected to address the risks associated with WAG 6 involves maintenance of site access controls prevent public exposure to on-site contaminants, continued monitoring of contaminant releases determine if source control measures are required, and development of technologies that could support the final remediation of WAG 6. Although active source control measures are not being implemented at WAG 6, environmental monitoring is necessary to ensure that any potential changes in contaminant release from the WAG are identified early enough to take appropriate action. Two types of environmental monitoring will be conducted: baseline monitoring and annual routine monitoring. The baseline monitoring will be conducted to establish the baseline contaminant release conditions at the WAG, confirm the site-related chemicals of concern (COCs), and gather data to confirm the site hydrologic model. The baseline monitoring is expected to begin in 1994 and last for 12--18 months. The annual routine monitoring will consist of continued sampling and analyses of COCs to determine off-WAG contaminant flux and risk, identify mills in releases, and confirm the primary contributors to risk. The annual routine monitoring will continue for {approximately} 4 years after completion of the baseline monitoring.

  13. Biological monitoring and abatement program plan for Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A.; Anderson, G.E.; Gregory, S.M.; Peterson, M.J.; Ryon, M.G.; Schilling, E.M.; Smith, J.G.; Southworth, G.R. [Oak Ridge National Lab., TN (United States); Phipps, T.L. [CKY, Inc., Oak Ridge, TN (United States)

    1997-06-01

    The overall purpose of this plan is to evaluate the receiving streams` biological communities for the duration of the permit and meet the objectives for the ORNL BMAP as outlined in the NPDES permit (Appendix). The ORNL BMAP will focus on those streams in the WOC watershed that (1) receive NPDES discharges and (2) have been identified as ecologically impacted. In response to the newly issued NPDES permit, the tasks that are included in this BMAP plan include monitoring biological communities (fish and benthic invertebrates), monitoring mercury contamination in fish and water, monitoring polychlorinated biphenyl (PCB) contamination in fish, and evaluating temperature loading from ORNL outfalls. The ORNL BMAP will evaluate the effects of sediment and oil and grease, as well as the chlorine control strategy through the use of biological community data. Monitoring will be conducted at sites in WOC, First Creek, Fifth Creek, Melton Branch, and WOL.

  14. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  15. RCRA Groundwater Monitoring Plan for Single-Shell Tank Waste Management Area C at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.; Narbutovskih, Susan M.

    2001-01-01

    This document describes the groundwater monitoring plan for Waste Management Area C located in the 200 East Area of the DOE Hanford Site. This plan is required under Resource Conservation and Recovery Act of 1976 (RCRA).

  16. Monitoring plan for routine organic air emissions at the Radioactive Waste Management Complex Waste Storage Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Galloway, K.J.; Jolley, J.G.

    1994-06-01

    This monitoring plan provides the information necessary to perform routine organic air emissions monitoring at the Waste Storage Facilities located at the Transuranic Storage Area of the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. The Waste Storage Facilities include both the Type I and II Waste Storage Modules. The plan implements a dual method approach where two dissimilar analytical methodologies, Open-Path Fourier Transform Infrared Spectroscopy (OP-FTIR) and ancillary SUMMA{reg_sign} canister sampling, following the US Environmental Protection Agency (EPA) analytical method TO-14, will be used to provide qualitative and quantitative volatile organic concentration data. The Open-Path Fourier Transform Infrared Spectroscopy will provide in situ, real time monitoring of volatile organic compound concentrations in the ambient air of the Waste Storage Facilities. To supplement the OP-FTIR data, air samples will be collected using SUMMA{reg_sign}, passivated, stainless steel canisters, following the EPA Method TO-14. These samples will be analyzed for volatile organic compounds with gas chromatograph/mass spectrometry analysis. The sampling strategy, procedures, and schedules are included in this monitoring plan. The development of this monitoring plan is driven by regulatory compliance to the Resource Conservation and Recovery Act, State of Idaho Toxic Air Pollutant increments, Occupational Safety and Health Administration. The various state and federal regulations address the characterization of the volatile organic compounds and the resultant ambient air emissions that may originate from facilities involved in industrial production and/or waste management activities.

  17. 78 FR 45266 - Notice of Intent To Prepare a Resource Management Plan for the Oklahoma, Kansas, and Texas...

    Science.gov (United States)

    2013-07-26

    ... incorporate, where applicable, management decisions brought forward from existing planning documents. 6... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan for the Oklahoma, Kansas, and Texas Planning Area and an Associated Environmental Impact Statement AGENCIES: Bureau of Land...

  18. 75 FR 4528 - Endangered and Threatened Species: Notice of Intent to Prepare a Recovery Plan for Cook Inlet...

    Science.gov (United States)

    2010-01-28

    ... plan development. NMFS is hereby soliciting relevant information on Cook Inlet beluga whales and their... Intent to Prepare a Recovery Plan for Cook Inlet Beluga Whales AGENCY: National Marine Fisheries Service... recovery plan for the Cook Inlet beluga whale (Delphinapterus leucas) and requests information from...

  19. Ground-water monitoring compliance plan for the Hanford Site Solid Waste Landfill

    Energy Technology Data Exchange (ETDEWEB)

    Fruland, R.M.

    1986-10-01

    Washington state regulations required that solid waste landfill facilities have ground-water monitoring programs in place by May 27, 1987. This document describes the well locations, installation, characterization studies and sampling and analysis plan to be followed in implementing the ground-water monitoring program at the Hanford Site Solid Waste Landfill (SWL). It is based on Washington Administrative Code WAC 173-304-490. 11 refs., 19 figs., 4 tabs.

  20. Inventory and Monitoring Plan for Washita National Wildlife Refuge and Optima National Wildlife Refuge, January 2, 2015

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) documents the inventory and monitoring surveys that will or could be conducted at Washita and Optima NWRs from 2015 through...

  1. Preparation of Micro-biosensor and Its Application in Monitoring in vivo Change of Dopamine

    Institute of Scientific and Technical Information of China (English)

    QIAO Xian; DING Hong; WANG Zhifang

    2005-01-01

    The self-made high sensitivity and selectivity micro-biosensor was applied to monitor the change of dopamine in cerebral nucleus in rats in vivo. The micro-biosensor was prepared and used to detect dopamine level in vitro and monitor the dynamic change of dopamine in different cerebral nucleus in vivo. The results showed the lowest concentration of dopamine that could be detected by the biosensor was 32.5 nmol/L. Its positive peak was significantly different from that of AA, 5-HTP and E. The biosensor could keep working for monitoring the dopamine concentration in the cerebral tissue for more than 10 h. It was concluded that the microsensor has high sensitivity and selectivity to dopamine and can be used to dynamically monitor the change of dopamine in vivo.

  2. 1997 Monitoring report for the Gunnison, Colorado Wetlands Mitigation Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) cleaned up uranium mill tailings and other surface contamination near the town of Gunnison, Colorado. Remedial action resulted in the elimination of 4.3 acres (ac) (1.7 hectares [ha]) of wetlands. This loss is mitigated by the enhancement of six spring-fed areas on Bureau of Land Management (BLM) land (mitigation sites). Approximately 254 ac (1 03.3 ha) were fenced at the six sites to exclude grazing livestock. Of the 254 ac (103.3 ha), 17.8 ac (7.2 ha) are riparian plant communities; the rest are sagebrush communities. Baseline grazed conditions of the riparian plant communities at the mitigation sites were measured prior to fencing. This report discusses results of the fourth year of a monitoring program implemented to document the response of vegetation and wildlife to the exclusion of livestock. Three criteria for determining success of the mitigation were established: plant height, vegetation density (bare ground), and vegetation diversity. By 1996, Prospector Spring, Upper Long`s Gulch, and Camp Kettle met the criteria. The DOE requested transfer of these sites to BLM for long-term oversight. The 1997 evaluation of the three remaining sites, discussed in this report, showed two sites (Houston Gulch and Lower Long`s Gulch) meet the criteria. The DOE will request the transfer of these two sites to the BLM for long-term oversight. The last remaining site, Sage Hen Spring, has met only two of the criteria (percent bare ground and plant height). The third criterion, vegetation diversity, was not met. The vegetation appears to be changing from predominantly wet species to drier upland species, although the reason for this change is uncertain. It may be due to below-normal precipitation in recent years, diversion of water from the spring to the stock tank, or manipulation of the hydrology farther up gradient.

  3. Multi-agent planning and scheduling, execution monitoring and incremental rescheduling: Application to motorway traffic

    Science.gov (United States)

    Mourou, Pascal; Fade, Bernard

    1992-01-01

    This article describes a planning method applicable to agents with great perception and decision-making capabilities and the ability to communicate with other agents. Each agent has a task to fulfill allowing for the actions of other agents in its vicinity. Certain simultaneous actions may cause conflicts because they require the same resource. The agent plans each of its actions and simultaneously transmits these to its neighbors. In a similar way, it receives plans from the other agents and must take account of these plans. The planning method allows us to build a distributed scheduling system. Here, these agents are robot vehicles on a highway communicating by radio. In this environment, conflicts between agents concern the allocation of space in time and are connected with the inertia of the vehicles. Each vehicle made a temporal, spatial, and situated reasoning in order to drive without collision. The flexibility and reactivity of the method presented here allows the agent to generate its plan based on assumptions concerning the other agents and then check these assumptions progressively as plans are received from the other agents. A multi-agent execution monitoring of these plans can be done, using data generated during planning and the multi-agent decision-making algorithm described here. A selective backtrack allows us to perform incremental rescheduling.

  4. Plan for Demonstration of Online Monitoring for the Light Water Reactor Sustainability Online Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Magdy S. Tawfik; Vivek Agarwal; Nancy J. Lybeck

    2011-09-01

    Condition based online monitoring technologies and development of diagnostic and prognostic methodologies have drawn tremendous interest in the nuclear industry. It has become important to identify and resolve problems with structures, systems, and components (SSCs) to ensure plant safety, efficiency, and immunity to accidents in the aging fleet of reactors. The Machine Condition Monitoring (MCM) test bed at INL will be used to demonstrate the effectiveness to advancement in online monitoring, sensors, diagnostic and prognostic technologies on a pilot-scale plant that mimics the hydraulics of a nuclear plant. As part of this research project, INL will research available prognostics architectures and their suitability for deployment in a nuclear power plant. In addition, INL will provide recommendation to improve the existing diagnostic and prognostic architectures based on the experimental analysis performed on the MCM test bed.

  5. Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Brandt, C.C.; Cicerone, D.S. [and others

    1998-02-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y-12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided, but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas or a reduction in sampling intensity in others. By using the results of previous monitoring efforts to define the current program and to guide them in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

  6. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Description.

    Science.gov (United States)

    Ford, Valeria A.

    The design of the Planning, Monitoring, and Implementation Model (PMI) and the aspects of the model that make it useful in public schools are the topics of this paper. After the objectives of a program or operation have been identified, the model specifies three additional pieces of information that are needed for an evaluation: inputs, processes,…

  7. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Rationale.

    Science.gov (United States)

    Cort, H. Russell

    The rationale for the Planning, Monitoring, and Implementation Model (PMI) is the subject of this paper. The Superintendent of the District of Columbia Public Schools requested a model for systematic evaluation of educational programs to determine their effectiveness. The school system's emphasis on objective-referenced instruction and testing,…

  8. Defense Business Transformation: DOD Should Improve Its Planning with and Performance Monitoring of the Military Departments

    Science.gov (United States)

    2016-12-01

    Management Officer (CMO) and Deputy Chief Management Officer (DCMO) Roles and Responsibilities of the DOD CMO • Ensure DOD’s core business functions...DEFENSE BUSINESS TRANSFORMATION DOD Should Improve Its Planning with and Performance Monitoring of the Military...Government Accountability Office Highlights of GAO-17-9, a report to congressional addresses December 2016 DEFENSE BUSINESS TRANSFORMATION DOD Should

  9. Management, Planning, and Monitoring Population Education Programmes. Abstract-Bibliography Series 8.

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    This document abstracts and reviews 32 publications that describe population education programs developed for Asia and the Pacific region. The documents are grouped under three sections: (1) management; (2) planning; and (3) monitoring/evaluation. Section 1 consists of 12 selected titles that deal with management of population education programs.…

  10. An evaluation of resource inventory and monitoring program used in national forest planning

    Science.gov (United States)

    Morrison, Michael L.; Marcot, Bruce G.

    1995-01-01

    The National Forest Management Act (1976) specifies that multiresource inventories be conducted to provide baseline data for development and, later, monitoring of national forest management plans. This mandate entails the most ambitious and complex resource planning effort ever attempted. In this paper we evaluate the structure and use of current inventory-monitoring programs and recommend a framework for gathering data to improve national forest planning. Current national guidelines are general and provide only basic directions to forest-level planners. Forest inventories have traditionally concentrated on timber. Although these inventories are often well designed, the questions we are now asking about forest resources have outgrown these methods. Forest management is impeded by general confusion over definitions of resources and the interactions among them. We outline a simple classification scheme that centers on identification of basic ecosystem elements that can be readily measured. Furthermore, spatial and temporal scales must be considered in the design of inventory-monitoring programs. The concept of ecological indicators is reviewed, and caution is advised in their use. Inventory-monitoring programs should be goal-directed and based on as rigorous a statistical design as possible. We also review fundamental issues of variable selection, validation, and sampling bias. We conclude by developing a flexible inventory-monitoring program that is designed to provide information on individual characteristics of the environment, rather than being based on fixed definitions of resources.

  11. The MEPPP Framework: A Framework for Monitoring and Evaluating Participatory Planning Processes.

    Science.gov (United States)

    Hassenforder, Emeline; Pittock, Jamie; Barreteau, Olivier; Daniell, Katherine Anne; Ferrand, Nils

    2016-01-01

    Evaluating participatory processes, participatory planning processes especially, can be challenging. Due to their complexity, these processes require a specific approach to evaluation. This paper proposes a framework for evaluating projects that have adopted a participatory planning approach: the monitoring and evaluation of participatory planning processes (MEPPP) framework. The MEPPP framework is applied to one case study, a participatory planning process in the Rwenzori region in Uganda. We suggest that this example can serve as a guideline for researchers and practitioners to set up the monitoring and evaluation of their participatory planning process of interest by following six main phases: (1) description of the case, (2) clarification of the M&E viewpoint(s) and definition of the M&E objective(s), (3) identification of the context, process and outputs/outcomes analytical variables, (4) development of the M&E methods and data collection, (5) data analysis, and (6) sharing of the M&E results. Results of the application of the MEPPP framework in Uganda demonstrate the ability of the framework to tackle the complexity of participatory planning processes. Strengths and limitations of the MEPPP framework are also discussed.

  12. UNBizPlanner: a software tool for preparing a business plan

    Directory of Open Access Journals (Sweden)

    Oscar Ávila Cifuentes

    2010-04-01

    Full Text Available Universities are currently expected to play a new role in society (in addition to research and teaching by engaging in a third mission concerning socio-economic development. Universities also play an important role in encouraging en-trepreneurs through training them in business planning. A business plan is a document summarising how an entre-preneur will create an organisation to exploit a business opportunity. Preparing a business plan draws on a wide range of knowledge from many business disciplines (e.g. finance, human resource management, intellectual pro-perty management, supply chain management, operations management and marketing. This article presents a computational tool for drawing up a business plan from a Colombian viewpoint by identifying the most relevant stages which are born in mind by national entities having most experience in creating and consolidating companies. Special emphasis was placed on analysing, designing and implementing a systems development life cycle for de-veloping the software. Reviewing the literature concerning business plans formed an important part of the analysis stage (bearing a Colombian viewpoint in mind.

  13. Guidance Manual for preparing Nuclear and Radiological Emergency Preparedness and Response Plan

    Energy Technology Data Exchange (ETDEWEB)

    Muhammed, Kabiru [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Jeong, Seung-Young [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-10-15

    The Nuclear and Radiological Emergency Preparedness and Response Plan(NREPRP) describes the capabilities, responsibilities and authorities of government agencies and a conceptual basis for integrating the activities of these agencies to protect public health and safety. The NREPRP addresses issues related to actual or perceived radiation hazard requiring a national response in order to: i. Provide co-ordination of a response involving multi-jurisdictions or significant national responsibilities; or ii. Provide national support to state and local governments. The objective of this research is to establish Guidance Manual for preparing a timely, organized and coordinated emergency response plan for Authorities/agencies to promptly and adequately determine and take actions to protect members of the public and emergency workers. The manual will not provide sufficient details for an adequate response. This level of details is contained in standard operating procedures that are being developed based on the plan developed. Base on the data obtain from integrated planning levels and responsibility sharing, the legal document of major government agencies participating in NREPRP form the legal basis for the response plan. Also the following documents should be some international legal binding documents. Base on the international safety requirement and some countries well developed NREPRP, we have drafted a guidance manual for new comer countries for easy development of their countries NREPRP. Also we have taken in to consideration lessons learn from most accident especially Fukushima accident.

  14. 78 FR 57668 - U.S. Nuclear Regulatory Commission Planned for Monitoring Activities for the Saltstone Disposal...

    Science.gov (United States)

    2013-09-19

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION U.S. Nuclear Regulatory Commission Planned for Monitoring Activities for the Saltstone Disposal... availability of ``U.S. Nuclear Regulatory Commission Plan for Monitoring Disposal Actions Taken by the...

  15. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    Energy Technology Data Exchange (ETDEWEB)

    Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q. [Department of Radiation Oncology, Duke University Medical Center Durham, North Carolina 27710 (United States)

    2015-01-15

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery

  16. Quality assurance for online adapted treatment plans: benchmarking and delivery monitoring simulation.

    Science.gov (United States)

    Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q

    2015-01-01

    An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were

  17. A risk-based sampling plan for monitoring of histamine in fish products.

    Science.gov (United States)

    Guillier, L; Thébault, A; Gauchard, F; Pommepuy, M; Guignard, A; Malle, P

    2011-02-01

    In 2008, the French Institute for Public Health Surveillance reported an increase in the number of histamine food poisoning outbreaks and cases in France. The aim of this study was to propose a new monitoring plan for characterizing consumers' exposure to histamine through fishery products. As fish products of concern are numerous, we proposed that the number of samples allocated for a fish category be chosen based on the risk associated with the category. Point risk estimates of histamine poisoning were assessed with the Risk Ranger tool. Fresh fish with high histidine content was found to contribute most to the number of cases. The (estimated) risks associated with the consumption of canned and deep-frozen fish appear marginal as compared with the risk associated with fresh fish with high histidine concentrations. Accordingly, we recommend excluding canned and deep-frozen fish from the monitoring plan, although these risk estimates can be biased. Within a category, samples were proportional to the relative food consumption of the different fishes. The spatial and seasonal consumption patterns were also taken into account for the design of the new monitoring plan. By testing appropriate numbers of samples from categories of fish products of concern, this plan will permit investigation of trends or comparison of product categories presenting risks of histamine poisoning.

  18. Effectiveness monitoring for the aquatic and riparian component of the Northwest Forest Plan: conceptual framework and options.

    Science.gov (United States)

    Gordon H. Reeves; David B. Hohler; David P. Larsen; David E. Busch; Kim Kratz; Keith Reynolds; Karl F. Stein; Thomas Atzet; Polly Hays; Michael. Tehan

    2004-01-01

    An Aquatic and Riparian Effectiveness Monitoring Plan (AREMP) for the Northwest Forest Plan is intended to characterize the ecological condition of watersheds and aquatic ecosystems. So to determine the effectiveness of the Northwest Forest Plan to meet relevant objectives, this report presents the conceptual foundation of options for use in pilot testing and...

  19. Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Brandt, C.C.; Christensen, S.W.; Greeley, M.S.JR.; Hill, W.R.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.

    2000-09-01

    The revised Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted as required by the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995 and became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Science Division (ESD) at the Oak Ridge National Laboratory (ORNL) at the request of the Y-12 Plant. The revision to the BMAP plan is based on results of biological monitoring conducted during the period of 1985 to present. Details of the specific procedures used in the current routine monitoring program are provided; experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional bioaccumulation monitoring if results indicate unexpectedly high PCBs or Hg) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is still observed). The program scope will be re-evaluated annually. By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of Y-12 Plant operations (past and present) on the biota of EFPC and to document the ecological effects of remedial actions.

  20. Domestic Water Service Delivery Indicators and Frameworks for Monitoring, Evaluation, Policy and Planning: A Review

    Directory of Open Access Journals (Sweden)

    Jamie Bartram

    2013-10-01

    Full Text Available Monitoring of water services informs policy and planning for national governments and the international community. Currently, the international monitoring system measures the type of drinking water source that households use. There have been calls for improved monitoring systems over several decades, some advocating use of multiple indicators. We review the literature on water service indicators and frameworks with a view to informing debate on their relevance to national and international monitoring. We describe the evidence concerning the relevance of each identified indicator to public health, economic development and human rights. We analyze the benefits and challenges of using these indicators separately and combined in an index as tools for planning, monitoring, and evaluating water services. We find substantial evidence on the importance of each commonly recommended indicator—service type, safety, quantity, accessibility, reliability or continuity of service, equity, and affordability. Several frameworks have been proposed that give structure to the relationships among individual indicators and some combine multiple indicator scores into a single index but few have been rigorously tested. More research is needed to understand if employing a composite metric of indicators is advantageous and how each indicator might be scored and scaled.

  1. Domestic Water Service Delivery Indicators and Frameworks for Monitoring, Evaluation, Policy and Planning: A Review

    Science.gov (United States)

    Kayser, Georgia L.; Moriarty, Patrick; Fonseca, Catarina; Bartram, Jamie

    2013-01-01

    Monitoring of water services informs policy and planning for national governments and the international community. Currently, the international monitoring system measures the type of drinking water source that households use. There have been calls for improved monitoring systems over several decades, some advocating use of multiple indicators. We review the literature on water service indicators and frameworks with a view to informing debate on their relevance to national and international monitoring. We describe the evidence concerning the relevance of each identified indicator to public health, economic development and human rights. We analyze the benefits and challenges of using these indicators separately and combined in an index as tools for planning, monitoring, and evaluating water services. We find substantial evidence on the importance of each commonly recommended indicator—service type, safety, quantity, accessibility, reliability or continuity of service, equity, and affordability. Several frameworks have been proposed that give structure to the relationships among individual indicators and some combine multiple indicator scores into a single index but few have been rigorously tested. More research is needed to understand if employing a composite metric of indicators is advantageous and how each indicator might be scored and scaled. PMID:24157507

  2. The use of condition monitoring information for maintenance planning and decision-making

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K.; Rosqvist, T. [VTT Industrial Systems (Finland); Paulsen, J.L. [Risoe National Lab., Roskilde (Denmark)

    2002-12-01

    A survey is presented outlining the use of condition monitoring information in three Nordic nuclear power plants. The questions of the survey relate to the role of condition monitoring in strategic, as well as operative, maintenance planning and decision-making. The survey indicates that condition monitoring is increasingly implemented at nuclear power plants, but very selectively and in a rather slow pace for predictive maintenance. A combined strategy of condition based maintenance and predetermined preventive maintenance is applied for important equipment such as main circulation pumps and steam turbines. A realistic aim is to reduce the number of costly or error prone maintenance and disassembling inspection activities by condition monitoring given that the approach enables a good diagnosis and prediction. Systematic follow-up and analysis of such condition monitoring information followed by a case-specific planning and decision making of timely and rightly directed maintenance actions can justify an extension of the intervals of a number of predetermined inspection, maintenance or periodic testing tasks. (au)

  3. Liquid Effluent Monitoring Information System test plans release 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.T.

    1994-10-11

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user.

  4. Liquid Effluent Monitoring Information System (LEMIS) test plans release 1.1

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.T.

    1994-09-08

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user.

  5. Liquid Effluent Monitoring Information System (LEMIS) test plans release 1.0

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.T.

    1994-10-12

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user.

  6. Independent verification of monitor unit calculation for radiation treatment planning system.

    Science.gov (United States)

    Chen, Li; Chen, Li-Xin; Huang, Shao-Min; Sun, Wen-Zhao; Sun, Hong-Qiang; Deng, Xiao-Wu

    2010-02-01

    To ensure the accuracy of dose calculation for radiation treatment plans is an important part of quality assurance (QA) procedures for radiotherapy. This study evaluated the Monitor Units (MU) calculation accuracy of a third-party QA software and a 3-dimensional treatment planning system (3D TPS), to investigate the feasibility and reliability of independent verification for radiation treatment planning. Test plans in a homogenous phantom were designed with 3-D TPS, according to the International Atomic Energy Agency (IAEA) Technical Report No. 430, including open, blocked, wedge, and multileaf collimator (MLC) fields. Test plans were delivered and measured in the phantom. The delivered doses were input to the QA software and the independent calculated MUs were compared with delivery. All test plans were verified with independent calculation and phantom measurements separately, and the differences of the two kinds of verification were then compared. The deviation of the independent calculation to the measurements was (0.1 +/- 0.9)%, the biggest difference fell onto the plans that used block and wedge fields (2.0%). The mean MU difference between the TPS and the QA software was (0.6 +/- 1.0)%, ranging from -0.8% to 2.8%. The deviation in dose of the TPS calculation compared to the measurements was (-0.2 +/- 1.7)%, ranging from -3.9% to 2.9%. MU accuracy of the third-party QA software is clinically acceptable. Similar results were achieved with the independent calculations and the phantom measurements for all test plans. The tested independent calculation software can be used as an efficient tool for TPS plan verification.

  7. OAK RIDGE Y-12 PLANT BIOLOGICAL MONITORING AND ABATEMENT PROGRAM (BMAP) PLAN

    Energy Technology Data Exchange (ETDEWEB)

    ADAMS, S.M.; BRANDT, C.C.; CHRISTENSEN, S.W.; CICERONE, D.S.; GREELEY, M.S.JR; HILL, W.R.; HUSTON, M.S.; KSZOS, L.A.; MCCARTHY, J.F.; PETERSON, M.J.; RYON, M.G.; SMITH, J.G.; SOUTHWORTH, G.R.; STEWART, A.J.

    1998-10-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y- 12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional toxicity testing if initial results indicate low survival or reproduction) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is observed). By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

  8. Identifying the 'if' for 'if-then' plans: combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour.

    Science.gov (United States)

    Verhoeven, Aukje A C; Adriaanse, Marieke A; de Vet, Emely; Fennis, Bob M; de Ridder, Denise T D

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring, a novel way to gain insight into triggers for unhealthy snacking. It was tested whether keeping a cue-monitoring diary and tailoring implementation intentions accordingly improves plan effectiveness. A 2 Monitoring (cue-monitoring, control) × 2 Planning (implementation intention, goal intention) between subjects design was adopted. Participants (N = 161) monitored their unhealthy snacking behaviour for a week using either a cue-monitoring or a control diary. Participants then formulated a goal intention or an implementation intention tailored to their personal cue. Snacking frequency and caloric intake from unhealthy snacks were examined using a seven-day snack diary. The results did not indicate an interaction but yielded a main effect of Monitoring. Cue-monitoring either or not combined with implementation intentions reduced unhealthy snacking behaviour compared with control. Findings emphasise the effectiveness of cue-monitoring, suggesting that on the short term, cue-monitoring suffices to decrease unhealthy snacking, without additional benefit from planning. Future research should examine whether supplementing cue-monitoring with implementation intentions is required to establish long-term behaviour change maintenance.

  9. Monitoring plan and maintenance NPP the Vandellos I and future prospects; Plan de vigilancia y mantenimiento de la instalacion nuclear Vandellos 1 y perspectivas de futuro

    Energy Technology Data Exchange (ETDEWEB)

    Margalef Escoda, S.

    2013-07-01

    This paper intends to give to know the singularities of an installation phase of latency and your monitoring and maintenance plan. the horizons that has the installation medium-term to guide the future dismantling level 3 monitoring and maintenance activities are also described.

  10. Preparation and Application of Film Sensor for Metal Structure Crack Monitoring

    Directory of Open Access Journals (Sweden)

    Bo HOU

    2015-11-01

    Full Text Available A crack monitoring technique is desired to ensure the safety and reliability of metallic structures. In the present study, a conductive film sensor was presented to monitor structural cracks in metal structures in real-time based on the electrical potential method. First, a Ti/TiN film sensor was prepared on the fatigue critical portion of a 2A12-T4 aluminum alloy specimen by vacuum ion plating technology, which allows firm integration with the metal surface. A finite element model (FEM of the Ti/TiN film sensor was then constructed and the changes in the output of the sensor along with corresponding changes in crack propagation were discussed. The results indicated that the Ti/TiN film sensor has high sensitivity to cracks and it is feasible to monitor structural surface cracks using the sensor. Finally, crack monitoring experiments were carried out based on the Ti/TiN film sensor. Experimental results showed that the output potential curve of the Ti/TiN film sensor contained several regions, which corresponded to plastic deformation accumulation, crack propagation, and sensor failure, respectively. Therefore, the information on the origination and propagation of structural cracks can be gained through analyzing changes in slope of the output potential values of the Ti/TiN film sensor with respect to time.DOI: http://dx.doi.org/10.5755/j01.ms.21.4.9623

  11. Hydrologic data and description of a hydrologic monitoring plan for Medicine Lake Volcano, California

    Science.gov (United States)

    Schneider, Tiffany Rae; McFarland, W.D.

    1996-01-01

    A hydrologic reconnaissance of the Medicine Lake Volcano area was done to collect data needed for the design of a hydrologic monitoring plan. The reconnaissance was completed during two field trips made in June and September 1992, during which geothermal and hydrologic features of public interest in the Medicine Lake area were identified. Selected wells, springs, and geothermal features were located and documented, and initial water-level, discharge, temperature, and specific-conductance measurements were made. Lakes in the study area also were surveyed during the September field trip. Temperature, specific- conductance, dissolved oxygen, and pH data were collected by using a multiparameter probe. The proposed monitoring plan includes measurement of water levels in wells, discharge from springs, and lake stage, as well as analysis of well-,spring-, and lake-water quality. In determining lake-water quality, data for both stratified and unstratified conditions would be considered. (Data for stratified conditions were collected during the reconnaissance phase of this project, but data for unstratified conditions were not.) In addition, lake stage also would be monitored. A geothermal feature near Medicine Lake is a "hot spot" from which hot gases discharge from two distinct vents. Gas chemistry and temperature would be monitored in one of these vents.

  12. The challenge of monitoring the cryosphere in alpine environments: Prepare the present for the future

    Science.gov (United States)

    Fischer, Andrea; Helfricht, Kay; Seiser, Bernd; Stocker-Waldhuber, Martin; Hartl, Lea; Wiesenegger, Hans

    2017-04-01

    , limits the number of potential candidates for future monitoring drastically. In the light of these developments, sample sizes are a critical question for reliable monitoring, together with strategies for coping with changing monitoring sites and composition of time series. As a first step, the Austrian monitoring network has been analyzed from 1891 onwards. Past changes evident from the glacier inventories capturing all glaciers have been compared to the subsamples of glaciers monitored for length change, mass balance and ice flow velocities. The results show that for capturing the full bandwidth of regional changes, glacier inventories are necessary. Without the analysis of larger scale changes, the interpretation of records with very low sample sizes, such as mass balance or length change, has a high uncertainty level. For specific research or monitoring purposes, for example, the development of runoff master sites with all types of monitoring techniques improve the certainty of the spatial extrapolations of local records or the interpretation of volume changes. The challenge of preparing the present network for the future requires a thorough analysis of potential future developments to be able to switch sites with a common observation period necessary to investigate the different sensitivities.

  13. Solving the AI Planning Plus Scheduling Problem Using Model Checking via Automatic Translation from the Abstract Plan Preparation Language (APPL) to the Symbolic Analysis Laboratory (SAL)

    Science.gov (United States)

    Butler, Ricky W.; Munoz, Cesar A.; Siminiceanu, Radu I.

    2007-01-01

    This paper describes a translator from a new planning language named the Abstract Plan Preparation Language (APPL) to the Symbolic Analysis Laboratory (SAL) model checker. This translator has been developed in support of the Spacecraft Autonomy for Vehicles and Habitats (SAVH) project sponsored by the Exploration Technology Development Program, which is seeking to mature autonomy technology for the vehicles and operations centers of Project Constellation.

  14. Surveillance Plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This Surveillance Plan has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model The baseline monitoring phase is expected to begin in 1994 and continue for 12--18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC The routine annual monitoring phase will continue for {approximately}4 years after completion of the baseline monitoring phase. This Surveillance Plan presents the technical and quality assurance surveillance activities for the various WAG 6 environmental monitoring and data evaluation plans and implementing procedures.

  15. Effects of minimum monitor unit threshold on spot scanning proton plan quality.

    Science.gov (United States)

    Howard, Michelle; Beltran, Chris; Mayo, Charles S; Herman, Michael G

    2014-09-01

    To investigate the influence of the minimum monitor unit (MU) on the quality of clinical treatment plans for scanned proton therapy. Delivery system characteristics limit the minimum number of protons that can be delivered per spot, resulting in a min-MU limit. Plan quality can be impacted by the min-MU limit. Two sites were used to investigate the impact of min-MU on treatment plans: pediatric brain tumor at a depth of 5-10 cm; a head and neck tumor at a depth of 1-20 cm. Three-field, intensity modulated spot scanning proton plans were created for each site with the following parameter variations: min-MU limit range of 0.0000-0.0060; and spot spacing range of 2-8 mm. Comparisons were based on target homogeneity and normal tissue sparing. For the pediatric brain, two versions of the treatment planning system were also compared to judge the effects of the min-MU limit based on when it is accounted for in the optimization process (Eclipse v.10 and v.13, Varian Medical Systems, Palo Alto, CA). The increase of the min-MU limit with a fixed spot spacing decreases plan quality both in homogeneous target coverage and in the avoidance of critical structures. Both head and neck and pediatric brain plans show a 20% increase in relative dose for the hot spot in the CTV and 10% increase in key critical structures when comparing min-MU limits of 0.0000 and 0.0060 with a fixed spot spacing of 4 mm. The DVHs of CTVs show min-MU limits of 0.0000 and 0.0010 produce similar plan quality and quality decreases as the min-MU limit increases beyond 0.0020. As spot spacing approaches 8 mm, degradation in plan quality is observed when no min-MU limit is imposed. Given a fixed spot spacing of ≤4 mm, plan quality decreases as min-MU increased beyond 0.0020. The effect of min-MU needs to be taken into consideration while planning proton therapy treatments.

  16. Impact of an in-built monitoring system on family planning performance in rural Bangladesh

    Directory of Open Access Journals (Sweden)

    Ashraf Ali

    2007-06-01

    Full Text Available Abstract Background During 1982–1992, the Maternal and Child Health Family Planning (MCH-FP Extension Project (Rural of International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B, in partnership with the Ministry of Health and Family Welfare (MoHFW of the Government of Bangladesh (GoB, implemented a series of interventions in Sirajganj Sadar sub-district of Sirajganj district. These interventions were aimed at improving the planning mechanisms and for reviewing the problem-solving processes to build an effective monitoring system of the interventions at the local level of the overall system of the MOHFW, GoB. Methods The interventions included development and testing of innovative solutions in service-delivery, provision of door-step injectables, and strengthening of the management information system (MIS. The impact of an in-built monitoring system on the overall performance was assessed during the period from June 1995 to December 1996, after the withdrawal of the interventions in 1992. Results The results of the assessment showed that Family Welfare Assistants (FWAs increased household-visits within the last two months, and there was a higher use of service-delivery points even after the withdrawal of the interventions. The results of the cluster surveys, conducted in 1996, showed that the selected indicators of health and family-planning services were higher than those reported by the Bangladesh Demographic and Health Survey (BDHS 1996–1997. During June 1995-December, 1996, the contraceptive prevalence rate (CPR increased by 13 percentage points (i.e. from 40% to 53%. Compared to the national CPR (49%, this increase was statistically significant (p Conclusion The in-built monitoring systems, including effective MIS, accompanied by rapid assessments and review of performance by the programme managers, have potentials to improve family planning performance in low-performing areas.

  17. Headcount and FTE data in the European health workforce monitoring and planning process.

    Science.gov (United States)

    Girasek, Edmond; Kovács, Eszter; Aszalós, Zoltán; Eke, Edit; Ragány, Károly; Kovács, Réka; Cserháti, Zoltán; Szócska, Miklós

    2016-07-16

    Health workforce (HWF) planning and monitoring processes face challenges regarding data and appropriate indicators. One such area fraught with difficulties is labour activity and, more specifically, defining headcount and full-time equivalent (FTE). This study aims to review national practices in FTE calculation formulas for selected EU Member States (MS). The research was conducted as a part of the Joint Action on European Health Workforce Planning and Forecasting. Definitions, categories and terms concerning the five sectoral professions were examined in 14 MS by conducting a survey. To gain a deeper understanding of the international data-reporting processes (Joint Questionnaire on Non-Monetary Health Care Statistics-JQ), six international expert interviews were conducted by using a semi-structured interview guide. Of the 14 investigated countries, four MS indicated that they report FTE to the JQ and that they also calculate FTE data for national planning purposes. The other countries do not use FTE data for national purposes, but most of them do use special calculations and/or estimation methods for converting headcount to FTE. The findings revealed significant differences between national calculation methods when reporting FTE data to the JQ. This diversity in terms of calculations and estimations can lead to biases with respect to international comparisons. This finding was reinforced by the expert interviews, since the experts agreed that the activities of healthcare professionals are a fundamental factor in HWF monitoring and planning. Experts underscored that activity should also be measured by FTE, and not only by headcount. FTE and headcount are significant factors in HWF planning and monitoring; therefore, national data collections should place emphasis on collecting data and calculating the appropriate indicators. National FTE could serve as a call to action for HWF planners due to the lack of matching international FTE data. At the international level

  18. Identifying the 'if' for 'if-then' plans : Combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour

    NARCIS (Netherlands)

    Verhoeven, Aukje A. C.; Adriaanse, Marieke A.; de Vet, Emely; Fennis, Bob M.; de Ridder, Denise T. D.

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring,

  19. Remote sensing applied to crop disease control, urban planning, and monitoring aquatic plants, oil spills, rangelands, and soil moisture

    Science.gov (United States)

    1975-01-01

    The application of remote sensing techniques to land management, urban planning, agriculture, oceanography, and environmental monitoring is discussed. The results of various projects are presented along with cost effective considerations.

  20. JEM spotlight: Nuclear desalination--environmental impacts and implications for planning and monitoring activities.

    Science.gov (United States)

    Anastasov, Vladimir; Khamis, Ibrahim

    2010-01-01

    Nuclear desalination has been identified as an option since the 1960s, but only recently, as climate change intensifies, has it gained interest again. Although environmental impacts of nuclear desalination have not been paid a lot of attention in the few implemented projects, now more than ever, it is essential to provide an overview of their nature and magnitude. The gathered information and basic analysis allow for a general comparison of a 200,000 m(3)/d nuclear desalination facility using a once-through cooling system as a reference case, with alternative co-location options. Results of the review indicate that the potential for marine impacts requires careful planning and monitoring. They also reveal that adverse coastal, atmospheric and socio-economic impacts are minor in comparison with other co-location alternatives. The issues regarding public health are discussed and experiences presented. Nuclear desalination facilities are expected to show a better environmental performance than other co-located power/desalination options. Environmental planning and monitoring activities are thus much simpler and their scope smaller, with the most important monitoring parameters listed. In conclusion, the application of nuclear desalination is recommended as a less environmentally harmful option.

  1. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, M.Y.; Shields, K.D.

    1999-04-02

    The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, PNNL-operated facilities are referred to as Balance-of-Plant (BOP) facilities. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R and D. R and D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in the FEMP.

  2. 78 FR 35957 - Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska...

    Science.gov (United States)

    2013-06-14

    ... Planning Area Alaska and Associated Environmental Impact Statement AGENCY: Bureau of Land Management... on issues, planning criteria, and management questions and concerns related to the Central Yukon RMP... wildlife management. 8. The RMP will be consistent with the Bureau's H-1601-1 Land Use Planning Handbook...

  3. Preparing a personal development plan for all members of the dental team.

    Science.gov (United States)

    Maguire, W; Blaylock, P

    2017-09-08

    Personal development plans (PDPs) have been a requirement for NHS hospital staff, Foundation Training and Dental Core Training for some years; however, the General Dental Council (GDC) are changing continuing professional development (CPD) requirements in 2018 (enhanced CPD) making a PDP a requirement for all members of the dental team. A PDP consists of objectives for targeting CPD most relevant to your practice or intended practice to undertake over a defined period to maximise the improvement of your professional development. The aim of this article is to explain how to prepare a PDP ahead of the requirement to utilise its benefits in training and performance for the dental team. This article references a template for all members of the dental team to record their PDP.

  4. Y-12 Groundwater Protection Program Monitoring Optimization Plan For Groundwater Monitoring Wells At The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2013-09-01

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted "active" status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells granted "inactive" status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans. This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes.

  5. Effect of Acuros XB algorithm on monitor units for stereotactic body radiotherapy planning of lung cancer.

    Science.gov (United States)

    Khan, Rao F; Villarreal-Barajas, Eduardo; Lau, Harold; Liu, Hong-Wei

    2014-01-01

    Stereotactic body radiotherapy (SBRT) is a curative regimen that uses hypofractionated radiation-absorbed dose to achieve a high degree of local control in early stage non-small cell lung cancer (NSCLC). In the presence of heterogeneities, the dose calculation for the lungs becomes challenging. We have evaluated the dosimetric effect of the recently introduced advanced dose-calculation algorithm, Acuros XB (AXB), for SBRT of NSCLC. A total of 97 patients with early-stage lung cancer who underwent SBRT at our cancer center during last 4 years were included. Initial clinical plans were created in Aria Eclipse version 8.9 or prior, using 6 to 10 fields with 6-MV beams, and dose was calculated using the anisotropic analytic algorithm (AAA) as implemented in Eclipse treatment planning system. The clinical plans were recalculated in Aria Eclipse 11.0.21 using both AAA and AXB algorithms. Both sets of plans were normalized to the same prescription point at the center of mass of the target. A secondary monitor unit (MU) calculation was performed using commercial program RadCalc for all of the fields. For the planning target volumes ranging from 19 to 375cm(3), a comparison of MUs was performed for both set of algorithms on field and plan basis. In total, variation of MUs for 677 treatment fields was investigated in terms of equivalent depth and the equivalent square of the field. Overall, MUs required by AXB to deliver the prescribed dose are on an average 2% higher than AAA. Using a 2-tailed paired t-test, the MUs from the 2 algorithms were found to be significantly different (p algorithms.

  6. [Monitoring of a HACCP (Hazard Analysis Critical Control Point) plan for Listeria monocytogenes control].

    Science.gov (United States)

    Mengoni, G B; Apraiz, P M

    2003-01-01

    The monitoring of a HACCP (Hazard Analysis Critical Control Point) plan for the Listeria monocytogenes control in the cooked and frozen meat section of a thermo-processing meat plant was evaluated. Seventy "non-product-contact" surface samples and fourteen finished product samples were examined. Thirty eight positive sites for the presence of Listeria sp. were obtained. Twenty-two isolates were identified as L. monocytogenes, two as L. seeligeri and fourteen as L. innocua. Non isolates were obtained from finished product samples. The detection of L. monocytogenes in cooked and frozen meat section environment showed the need for the HACCP plan to eliminate or prevent product contamination in the post-thermal step.

  7. Reliability-Based Design and Planning of Inspection and Monitoring of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Marquez-Dominguez, Sergio

    Maintaining and developing a sustainable wind industry is the main motivation of this PhD thesis entitled “Reliability-based design and planning of inspection and monitoring of offshore wind turbines”. In this thesis, statistical methods and probability theory are important mathematical tools used...... and offshore wind turbine foundations with the aim of improving the design, decreasing structural costs and increasing benefits. Recently, wind energy technology has started to adopt risk and reliability based inspection planning (RBI) as a methodology based on Bayesian decision theories together...... produced by the natural phenomena, i.e. wind and waves. This load interaction has an important influence on the dynamical behaviour as well as on the fatigue damage of the wind turbine structure, influencing its reliability and stability. In summation, wind, currents and sea loads can be considered...

  8. Monitoring plan for vegetation responses to elk management in Rocky Mountain National Park

    Science.gov (United States)

    Zeigenfuss, Linda C.; Johnson, Therese L.; Wiebe, Zachary

    2011-01-01

    Rocky Mountain National Park (RMNP) in north-central Colorado supports numerous species of wildlife, including several large ungulate species among which Rocky Mountain elk (Cervus elaphus) are the most abundant. Elk are native to RMNP but were extirpated from the area by the late 1800s. They were reintroduced to the area in 1913-1914, and the elk herd grew to the point that it was actively managed from 1944 until 1968. In 1969, the active control of elk was discontinued and since then the herd has increased to a high point ranging from 2,800 to 3,500 between 1997 and 2001. In recent years, there has been growing concern over the condition of vegetation in the park and conflicts between elk and humans, both inside and outside the park. In response to these concerns, RMNP implemented an Elk and Vegetation Management Plan (EVMP) in 2009 to guide management actions in the park over a 20-year time period with the goal of reducing the impacts of elk on vegetation and restoring the natural range of variability in the elk population and affected plant and animal communities. The EVMP outlines the desired future condition for three vegetation communities where the majority of elk herbivory impacts are being observed: aspen, montane riparian willow, and upland herbaceous communities. The EVMP incorporates the principle of adaptive management whereby the effectiveness of management actions is assessed and adjusted as needed to successfully achieve objectives. Determination of whether vegetation objectives are being achieved requires monitoring and evaluation of target vegetation communities. The current report describes the design and implementation of a vegetation-monitoring program to help RMNP managers assess the effectiveness of their management actions and determine when and where to alter actions to achieve the EVMP's vegetation objectives. This monitoring plan details the process of selecting variables to be monitored, overall sampling design and structure, site

  9. Vision 20/20: Positron emission tomography in radiation therapy planning, delivery, and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Parodi, Katia, E-mail: Katia.parodi@physik.uni-muenchen.de [Faculty of Physics, Department of Medical Physics, Ludwig Maximilians University Munich, Munich 85748 (Germany)

    2015-12-15

    Positron emission tomography (PET) is increasingly considered as an effective imaging method to support several stages of radiation therapy. The combined usage of functional and morphological imaging in state-of-the-art PET/CT scanners is rapidly emerging to support the treatment planning process in terms of improved tumor delineation, and to assess the tumor response in follow-up investigations after or even during the course of fractionated therapy. Moreover, active research is being pursued on new tracers capable of providing different insights into tumor function, in order to identify areas of the planning volume which may require additional dosage for improved probability of tumor control. In this respect, major progresses in the next years will likely concern the development and clinical investigation of novel tracers and image processing techniques for reliable thresholding and segmentation, of treatment planning and beam delivery approaches integrating the PET imaging information, as well as improved multimodal clinical instrumentation such as PET/MR. But especially in the rapidly emerging case of ion beam therapy, the usage of PET is not only limited to the imaging of external tracers injected to the patient. In fact, a minor amount of positron emitters is formed in nuclear fragmentation reactions between the impinging ions and the tissue, bearing useful information for confirmation of the delivered treatment during or after therapeutic irradiation. Different implementations of unconventional PET imaging for therapy monitoring are currently being investigated clinically, and major ongoing research aims at new dedicated detector technologies and at challenging applications such as real-time imaging and time-resolved in vivo verification of motion compensated beam delivery. This paper provides an overview of the different areas of application of PET in radiation oncology and discusses the most promising perspectives in the years to come for radiation therapy

  10. Regulation Plans on Severe Accidents developed by KINS Severe Accident Regulation Preparation TFT

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kyun Tae; Chung, Ku Young; Na, Han Bee [KINS, Daejeon (Korea, Republic of)

    2016-05-15

    Some nuclear power plants in Fukushima Daiichi site had lost their emergency reactor cooling function for long-time so the fuels inside the reactors were molten, and the integrity of containment was damaged. Therefore, large amount of radioactive material was released to environment. Because the social and economic effects of severe accidents are enormous, Korean Government already issued 'Severe Accident Policy' in 2001 which requires nuclear power plant operators to set up 'Quantitative Safety Goal', to do 'Probabilistic Safety Analysis', to install 'Severe Accident Countermeasures' and to make 'Severe Accident Management Plan'. After the Fukushima disaster, a Special Safety Inspection was performed for all operating nuclear power plants of Korea. The inspection team from industry, academia, and research institutes assessed Korean NPPs capabilities to cope with or respond to severe accidents and emergency situation caused by natural disasters such as a large earthquake or tsunami. As a result of the special inspection, about 50 action items were identified to increase the capability to cope with natural disaster and severe accidents. Nuclear Safety Act has been amended to require NPP operators to submit Accident Management Plant as part of operating license application. The KINS Severe Accident Regulation Preparation TFT had first investigated oversea severe accident regulation trend before and after the Fukushima accident. Then, the TFT has developed regulation draft for severe accidents such as Severe accident Management Plans, the required design features for new NPPs to prevent severe accident against multiple failures and beyond-design external events, countermeasures to mitigate severe accident and to keep the integrity of containment, and assessment methodology on safety assessment plan and probabilistic safety assessment.

  11. Planning and Monitoring of Urban Development: The Role of the Housing Price Index

    Directory of Open Access Journals (Sweden)

    Tomi Deutsch

    2016-01-01

    Full Text Available In this paper the real estate market in Slovenia and selected Slovenian city municipalities is analyzed with the goal of establishing whether or not it is possible to use the Housing Price Index as an indicator of urban development. The analysis shows that the real estate market in the Slovenian city municipalities has in recent decades been subject to a number of changes with a long-term effect. The analysis further proves that under certain conditions the Housing Price Index can serve as one of the indicators policy makers could use in planning and monitoring of urban development.

  12. Draft Plan to Develop Non-Intrusive Load Monitoring Test Protocols

    Energy Technology Data Exchange (ETDEWEB)

    Mayhorn, Ebony T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sullivan, Greg P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Petersen, Joseph M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-29

    This document presents a Draft Plan proposed to develop a common test protocol that can be used to evaluate the performance requirements of Non-Intrusive Load Monitoring. Development on the test protocol will be focused on providing a consistent method that can be used to quantify and compare the performance characteristics of NILM products. Elements of the protocols include specifications for appliances to be used, metrics, instrumentation, and a procedure to simulate appliance behavior during tests. In addition, three priority use cases for NILM will be identified and their performance requirements will specified.

  13. An experimental quality control related to the regional monitoring plan against Aedes albopticus (tiger-mosquito

    Directory of Open Access Journals (Sweden)

    Samantha Morelli

    2009-06-01

    Full Text Available Following the epidemic disease caused by the Chikungunya virus detected in the Provinces of Romagna during 2007, a specific monitoring-plan against the bug-vector Aedes albopticus was set up by the Agenzia Regionale Prevenzione e Ambiente dell’Emilia Romagna (ARPA in the he Emilia-Romagna region (Italy. The analytical method consisted in the simple enumeration of the mosquitoes eggs spawned on a appropriate substratum, using an optic microscope.The aim of this study was to guarantee data comparability among the several laboratories involved in the project. Using the Analysis of Variance (ANOVA, homogeneous and comparable analytical data were emphasised.

  14. Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. Brent; Smith, Ronald M.; Chou, Charissa J.

    2000-11-28

    The 216-B-3 Pond was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In 1990, groundwater monitoring at B Pond was elevated from "detection" to assessment status because total organic halides and total organic carbon were found to exceed critical means in two wells. Groundwater quality assessment, which ended in 1996, failed to find any specific hazardous waste contaminant that could have accounted for the isolated occurrences of elevated total organic halides and total organic carbon. Hence, the facility was subsequently returned to detection-level monitoring in 1998. Exhaustive groundwater analyses during the assessment period indicated that only two contaminants, tritium and nitrate, could be positively attributed to the B Pond System, with two others (arsenic and I-129) possibly originating from B Pond. Chemical and radiological analyses of soil at the main pond and 216-B-3-3 ditch has not revealed significant contamination. Based on the observed, minor contamination in groundwater and in the soil column, three parameters were selected for site-specific, semiannual monitoring; gross alpha, gross beta, and specific conductance. Total organic halides and total organic carbon are included as constituents because of regulatory requirements. Nitrate, tritium, arsenic, and iodine-129 will be monitored under the aegis of Hanford site-wide monitoring. Although the B Pond System is not scheduled to advance from RCRA interim status to final status until the year 2003, a contingency plan for an improved monitoring strategy, which will partially emulate final status requirements, will be contemplated before the official change to final status. This modification will allow a more sensible and effective screening of groundwater for the facility.

  15. Plan for the performance monitoring of solar systems installed by the SUIEDE program: NCAT/SUEDE interaction

    Energy Technology Data Exchange (ETDEWEB)

    Hopkins, M

    1979-02-01

    The SUEDE Grantee solar system installation programs were reviewed to determine the type, number, and quality of Grantee-installed solar systems available for monitoring consideration. An NCAT Performance Monitoring Plan is presented which identifies the service and technical assistance that NCAT will need to provide based on the Grantee review. (MHR)

  16. NASA's Plans for Developing Life Support and Environmental Monitoring and Control Systems

    Science.gov (United States)

    Lawson, B. Michael; Jan, Darrell

    2006-01-01

    Life Support and Monitoring have recently been reworked in response to the Vision for Space Exploration. The Exploration Life Support (ELS) Project has replaced the former Advanced Life Support Element of the Human Systems Research and Technology Office. Major differences between the two efforts include: the separation of thermal systems into a new stand alone thermal project, deferral of all work in the plant biological systems, relocation of food systems to another organization, an addition of a new project called habitation systems, and overall reduction in the number of technology options due to lower funding. The Advanced Environmental Monitoring and Control (AEMC) Element is retaining its name but changing its focus. The work planned in the ELS and AEMC projects is organized around the three major phases of the Exploration Program. The first phase is the Crew Exploration Vehicle (CEV). The ELS and AEMC projects will develop hardware for this short duration orbital and trans-lunar vehicle. The second phase is sortie landings on the moon. Life support hardware for lunar surface access vehicles including upgrades of the CEV equipment and technologies which could not be pursued in the first phase due to limited time and budget will be developed. Monitoring needs will address lunar dust issues, not applicable to orbital needs. The ELS and AEMC equipment is of short duration, but has different environmental considerations. The third phase will be a longer duration lunar outpost. This will consist of a new set of hardware developments better suited for long duration life support and associated monitoring needs on the lunar surface. The presentation will show the planned activities and technologies that are expected to be developed by the ELS and AEMC projects for these program phases.

  17. Addendum to Environmental Monitoring Plan, Nevada Test Site and Support Facilities; Addendum 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This 1993 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/10630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Operations Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1993 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  18. Performance Assessment Monitoring Plan for the Hanford Site Low Level Waste Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    SONNICHSEN, J.C.

    2000-11-15

    As directed by the U.S. Department of Energy (DOE), Richland Operations Office (DOE-RL), Fluor Hanford, Inc. will implement the requirements of DOE Order 435.1, Radioactive Waste Management, as the requirements relate to the continued operation of the low-level waste disposal facilities on the Hanford Site. DOE Order 435.1 requires a disposal authorization statement authorizing operation (or continued operation) of a low-level waste disposal facility. The objective of this Order is to ensure that all DOE radioactive waste is managed in a manner that protects the environment and personnel and public health and safety. The manual (DOE Order 435.1 Manual) implementing the Order states that a disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980 documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility. Failure to obtain a disposal authorization statement shall result in shutdown of an operational disposal facility. In fulfillment of the requirements of DOE Order 435.1, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area and the 200 West Area Low-Level Burial Grounds. The disposal authorization statement constitutes approval of the performance assessment and composite analysis, authorizes operation of the facility, and includes conditions that the disposal facility must meet. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area Low-Level Burial Grounds be written and approved by the DOE-RL. The monitoring plan is to be updated and implemented within 1 year following issuance of the disposal authorization statement to

  19. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  20. Monitoring preparation and phase transitions of carburized W(1 1 0) by reflectance difference spectroscopy

    Energy Technology Data Exchange (ETDEWEB)

    Bachmann, Magdalena [Institute of Physical Chemistry, University of Innsbruck, Innrain 52a, A-6020 Innsbruck (Austria); Memmel, Norbert, E-mail: norbert.memmel@uibk.ac.at [Institute of Physical Chemistry, University of Innsbruck, Innrain 52a, A-6020 Innsbruck (Austria); Bertel, Erminald [Institute of Physical Chemistry, University of Innsbruck, Innrain 52a, A-6020 Innsbruck (Austria); Denk, Mariella; Hohage, Michael; Zeppenfeld, Peter [Institute of Experimental Physics, Johannes Kepler University Linz, Altenbergerstr. 69, A-4040 Linz (Austria)

    2012-10-01

    Highlights: Black-Right-Pointing-Pointer Real-time in situ monitoring of W(1 1 0) surface cleaning. Black-Right-Pointing-Pointer Real-time in situ monitoring of carburazation kinetics on W(1 1 0) by RDS. Black-Right-Pointing-Pointer Phase transformation R(15 Multiplication-Sign 3)-C/W(1 1 0)-R(15 Multiplication-Sign 12)-C/W(1 1 0) studied by RDS, AES and LEED. - Abstract: Reflectance difference spectroscopy (RDS) is applied to follow in situ the preparation of clean and carburized W(1 1 0) surfaces and to study the temperature-induced transition between the R(15 Multiplication-Sign 3) and R(15 Multiplication-Sign 12) carbon/tungsten surface phases. RDS data for this transition are compared to data obtained from Auger-electron spectroscopy and low-energy electron diffraction. All techniques reveal that this transition, occurring around 1870 K, is reversible with a small hysteresis, indicating a first-order-like behaviour. The present results also prove a high surface sensitivity of RDS, which is attributed to the excitation of electronic p-like surface resonances of W(1 1 0).

  1. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-04-01

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells granted “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.

  2. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, Marcel Y.; Gervais, Todd L.

    2004-11-15

    The Pacific Northwest National Laboratory (PNNL) operates a number of Research & Development (R&D) facilities for the U.S. Department of Energy (DOE) on the Hanford Site. Facility effluent monitoring plans (FEMPs) have been developed to document the facility effluent monitoring portion of the Environmental Monitoring Plan (DOE 2000) for the Hanford Site. Three of PNNL’s R&D facilities, the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling, and individual FEMPs were developed for these facilities in the past. In addition, a balance-of-plant (BOP) FEMP was developed for all other DOE-owned, PNNL-operated facilities at the Hanford Site. Recent changes, including shutdown of buildings and transition of PNNL facilities to the Office of Science, have resulted in retiring the 3720 FEMP and combining the 331 FEMP into the BOP FEMP. This version of the BOP FEMP addresses all DOE-owned, PNNL-operated facilities at the Hanford Site, excepting the Radiochemical Processing Laboratory, which has its own FEMP because of the unique nature of the building and operations. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R&D. R&D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in Appendix A. Potential radioactive airborne emissions in the BOP facilities are estimated annually using a building inventory-based approach provided in federal regulations. Sampling at individual BOP facilities is based on a potential-to-emit assessment. Some of these facilities are considered minor emission points and thus are sampled routinely, but not continuously, to confirm the low emission potential. One facility, the 331 Life Sciences Laboratory, has a major emission point and is sampled continuously. Sampling systems are

  3. Groundwater level monitoring sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This Sampling and Analysis Plan addresses groundwater level monitoring activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Groundwater level monitoring will be conducted at 129 sites within the WAG. All of the sites will be manually monitored on a semiannual basis. Forty-five of the 128 wells, plus one site in White Oak Lake, will also be equipped with automatic water level monitoring equipment. The 46 sites are divided into three groups. One group will be equipped for continuous monitoring of water level, conductivity, and temperature. The other two groups will be equipped for continuous monitoring of water level only. The equipment will be rotated between the two groups. The data collected from the water level monitoring will be used to support determination of the contaminant flux at WAG 6.

  4. Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Steward, Cleveland R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing wild

  5. Participatory Planning, Monitoring and Evaluation of Multi-Stakeholder Platforms in Integrated Landscape Initiatives.

    Science.gov (United States)

    Kusters, Koen; Buck, Louise; de Graaf, Maartje; Minang, Peter; van Oosten, Cora; Zagt, Roderick

    2017-03-21

    Integrated landscape initiatives typically aim to strengthen landscape governance by developing and facilitating multi-stakeholder platforms. These are institutional coordination mechanisms that enable discussions, negotiations, and joint planning between stakeholders from various sectors in a given landscape. Multi-stakeholder platforms tend to involve complex processes with diverse actors, whose objectives and focus may be subjected to periodic re-evaluation, revision or reform. In this article we propose a participatory method to aid planning, monitoring, and evaluation of such platforms, and we report on experiences from piloting the method in Ghana and Indonesia. The method is comprised of three components. The first can be used to look ahead, identifying priorities for future multi-stakeholder collaboration in the landscape. It is based on the identification of four aspirations that are common across multi-stakeholder platforms in integrated landscape initiatives. The second can be used to look inward. It focuses on the processes within an existing multi-stakeholder platform in order to identify areas for possible improvement. The third can be used to look back, identifying the main outcomes of an existing platform and comparing them to the original objectives. The three components can be implemented together or separately. They can be used to inform planning and adaptive management of the platform, as well as to demonstrate performance and inform the design of new interventions.

  6. Monitoring outcomes for the Medicare Advantage program: methods and application of the VR-12 for evaluation of plans.

    Science.gov (United States)

    Kazis, Lewis E; Selim, Alfredo J; Rogers, William; Qian, Shirley X; Brazier, John

    2012-01-01

    The Veterans RAND 12-Item Health Survey (VR-12) is one of the major patient-reported outcomes for ranking the Medicare Advantage (MA) plans in the Health Outcomes Survey (HOS). Approaches for scoring physical and mental health are given using contemporary norms and regression estimators. A new metric approach for the VR-12 called the "VR-6D" is presented with case-mix adjustments for monitoring plans that combine utilities and mortality. Results show that the models for ranking health outcomes of the plans are robust and credible. Future directions include the use of utilities for evaluating and ranking of MA plans.

  7. 78 FR 60850 - Endangered and Threatened Species; Notice of Intent To Prepare a Recovery Plan for Main Hawaiian...

    Science.gov (United States)

    2013-10-02

    ... Intent To Prepare a Recovery Plan for Main Hawaiian Islands Insular False Killer Whale Distinct... for the Main Hawaiian Islands insular false killer whale (Pseudorca crassidens) distinct population... development. We are soliciting relevant information related to the MHI insular FKW and their...

  8. A Strategic Plan of Academic Management System as Preparation for EAC Accreditation Visit--From UKM Perspective

    Science.gov (United States)

    Ab-Rahman, Mohammad Syuhaimi; Yusoff, Abdul Rahman Mohd; Abdul, Nasrul Amir; Hipni, Afiq

    2015-01-01

    Development of a robust platform is important to ensure that the engineering accreditation process can run smoothly, completely and the most important is to fulfill the criteria requirements. In case of Malaysia, the preparation for EAC (Engineering Accreditation Committee) assessment required a good strategic plan of academic management system…

  9. 76 FR 41814 - Notice of Intent To Prepare an Amendment to the 1985 Wells Resource Management Plan for...

    Science.gov (United States)

    2011-07-15

    ... of Intent To Prepare an Amendment to the 1985 Wells Resource Management Plan for Recreation in the... of Land Management (BLM) Wells Field Office, Elko, Nevada, is proposing to amend the 1985 Wells... initiates the public scoping process for the amendment to the Wells RMP and associated EA. Comments...

  10. 76 FR 43704 - Notice of Intent To Prepare an Amendment to the 1992 Three Rivers Resource Management Plan for...

    Science.gov (United States)

    2011-07-21

    ... Bureau of Land Management Notice of Intent To Prepare an Amendment to the 1992 Three Rivers Resource Management Plan for Land Tenure in the Skull Creek Area and Associated Environmental Assessment, Oregon... process for the EA and Land Tenure Amendment to the Three Rivers RMP. Comments on issues may be...

  11. An integrated approach to the Environmental Monitoring Plan of the Pertuso spring (Upper Valley of Aniene River

    Directory of Open Access Journals (Sweden)

    Giuseppe Sappa

    2014-06-01

    Full Text Available Quantitative assessment of groundwater and surface water is an important tool for sustainable management and protection of these important resources. This paper deals with the design of a multi-disciplinary monitoring plan related to the catchment project of the Pertuso spring, in the Upper Valley of Aniene River, which is going to be exploited to supply an important water network in the South part of Roma district. According to the Legislative Decree 152/2006, as modified by DM 260/2010, any infrastructure design should take in consideration an Environmental Monitoring Plan for the hydrogeological settings of the study area. Thus, the hydrogeological characterization combined with an Environmental Monitoring Plan provides to evaluate the potential adverse environmental impacts due catchment works. For water resources assessment and management, the quantification of groundwater recharge is a preliminary step. As a matter of fact, it has been included the quantitative characterization of the Pertuso spring, in the aim of to protect catchment area, which is directly affect by the natural hydrogeological balance of this aquifer. Thus, a multi-disciplinary monitoring plan has been set up, including quantitative and hydrogeochemical measurements, both for groundwater and surface water of the Upper Valley of Aniene River. The target of this Environmental Monitoring Plan is to set up the background framework on the hydromorphological, physico-chemical and biological properties of water resources in the water basin influenced aim by any potential environmental impact due to the construction activities. The Environmental Monitoring Plan and main features of the monitoring network will be presented in this study.

  12. Application for verification of monitor units of the treatment planning system; Aplicacion para la verificacion de unidades monitor del sistema de planificacion de tratamientos

    Energy Technology Data Exchange (ETDEWEB)

    Suero Rodrigo, M. A.; Marques Fraguela, E.

    2011-07-01

    Current estimates algorithms achieve acceptable degree of accuracy. However, operate on the basis of un intuitive models. It is therefore necessary to verify the calculation of monitor units of the treatment planning system (PTS) with those obtained by other independent formalisms. To this end, we have developed an application based on factorization formalism that automates the calculation of dose.

  13. Incorporating voltage security into the planning, operation and monitoring of restructured electric energy markets

    Science.gov (United States)

    Nair, Nirmal-Kumar

    As open access market principles are applied to power systems, significant changes are happening in their planning, operation and control. In the emerging marketplace, systems are operating under higher loading conditions as markets focus greater attention to operating costs than stability and security margins. Since operating stability is a basic requirement for any power system, there is need for newer tools to ensure stability and security margins being strictly enforced in the competitive marketplace. This dissertation investigates issues associated with incorporating voltage security into the unbundled operating environment of electricity markets. It includes addressing voltage security in the monitoring, operational and planning horizons of restructured power system. This dissertation presents a new decomposition procedure to estimate voltage security usage by transactions. The procedure follows physical law and uses an index that can be monitored knowing the state of the system. The expression derived is based on composite market coordination models that have both PoolCo and OpCo transactions, in a shared stressed transmission grid. Our procedure is able to equitably distinguish the impacts of individual transactions on voltage stability, at load buses, in a simple and fast manner. This dissertation formulates a new voltage stability constrained optimal power flow (VSCOPF) using a simple voltage security index. In modern planning, composite power system reliability analysis that encompasses both adequacy and security issues is being developed. We have illustrated the applicability of our VSCOPF into composite reliability analysis. This dissertation also delves into the various applications of voltage security index. Increasingly, FACT devices are being used in restructured markets to mitigate a variety of operational problems. Their control effects on voltage security would be demonstrated using our VSCOPF procedure. Further, this dissertation investigates

  14. T-TY Tank Farm Interim Surface Barrier Demonstration—Vadose Zone Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

    2010-09-27

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy’s Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

  15. Incorporating genetic sampling in long-term monitoring and adaptive management in the San Diego County Management Strategic Plan Area, Southern California

    Science.gov (United States)

    Vandergast, Amy G.

    2017-06-02

    Habitat and species conservation plans usually rely on monitoring to assess progress towards conservation goals. Southern California, USA, is a hotspot of biodiversity and home to many federally endangered and threatened species. Here, several regional multi-species conservation plans have been implemented to balance development and conservation goals, including in San Diego County. In the San Diego County Management Strategic Plan Area (MSPA), a monitoring framework for the preserve system has been developed with a focus on species monitoring, vegetation monitoring, threats monitoring and abiotic monitoring. Genetic sampling over time (genetic monitoring) has proven useful in gathering species presence and abundance data and detecting population trends, particularly related to species and threats monitoring objectives. This report reviews genetic concepts and techniques of genetics that relate to monitoring goals and outlines components of a genetic monitoring scheme that could be applied in San Diego or in other monitoring frameworks throughout the Nation.

  16. Preparation and performance of fluorescent sensing coating for monitoring corrosion of Al alloy 2024

    Institute of Scientific and Technical Information of China (English)

    LI Song-mei; ZHANG Hong-rui; LIU Jian-hua

    2006-01-01

    A kind of fluorescent sensing coating was prepared for monitoring corrosion of aluminum alloys by incorporating phenylfluorone(PF) into acrylic paint as sensing material. The fluorescent dye PF reacts with aluminum ions on corroded aluminum substrate to occur fluorescence quenching observed in UV light. This paint system is sensitive to underlying corrosion processes through reacting with the Al3+ produced by anodic reaction accompanying corrosion. After a certain time,when the samples of Al alloy 2024 coated with PF-acrylic paint were immersed in 1 mol/L NaCl solution,fluorescence quenching spots can be seen with unaided eyes. With the development of corrosion process,the size of fluorescence quenching spots increases. Active corrosion areas on the sample surface were found under the fluorescence quenching spots by optical microscope. The corrosion areas can be observed more clearly by SEM,and many pits are found. This suggests that the fluorescence quenching spots are the sites of produced Al3+ by the anodic reaction of the local attack of the coated Al alloy substrate in the chloride solution and the corrosion process of the coated Al alloy can be monitored on-line by the sensing coating. The sensitivity of this coating system for detection of anodic reaction associated with corrosion was determined by applying constant charge current and measuring the charge,at which fluorescence quenching is detected in the coating with unaided eyes. Visual observation of coated samples can detect fluorescence change resulting from a charge corresponding to an equivalent hemispherical pit with approximate depth of 50 μm.

  17. Testing and monitoring plan for the permanent isolation surface barrier prototype

    Energy Technology Data Exchange (ETDEWEB)

    Gee, G.W.; Cadwell, L.L.; Freeman, H.D.; Ligotke, M.W.; Link, S.O.; Romine, R.A.; Walters, W.H. Jr.

    1993-06-01

    This document is a testing and monitoring plan for a prototype barrier to be constructed at the Hanford Site in 1993. The prototype barrier is an aboveground structure engineered to demonstrate the basic features of an earthen cover system, designed to permanently isolate waste from the biosphere. These features include multiple layers of soil and rock materials and a low-permeability asphalt sublayer. The surface of the barrier consists of silt loam soil, vegetated with plants. The barrier sides are reinforced with rock or coarse earthen-fill to protect against wind and water erosion. The sublayers inhibit plant and animal intrusion and percolation of water. A series of tests will be conducted on the prototype over the next several years to evaluate barrier performance under extreme climatic conditions.

  18. An innovative price plan monitoring and advisory system: A case study of mobile telecom service in Thailand

    Directory of Open Access Journals (Sweden)

    Manarach Amornrattanapaichit

    2014-04-01

    Full Text Available An innovative price plan monitoring and advisory system simulates subscriber usage consumption for offering suitable price plan. The aim of this paper is to develop the decision support system by using Statistical Process Control (SPC to identify subscriber usage behavior and provide critical visibility into subscriber consumption to detect their inappropriate usage especially in exceeding usage. To explore subscriber usage behavior, a forecasting model and a regression is employed to identify related factors and predictive usage model. The innovative price plan monitoring and advisory system has been verified and validated with one of the largest telecommunication company in Thailand. Using decision support system with effective control chart and real subscriber behavior pattern help mobile network operator grow their revenues and profits by offering an appropriate price plan as well as improve subscriber experience with more flexible choice to meet their individual usage consumption needs.

  19. Preparation

    Directory of Open Access Journals (Sweden)

    M.M. Dardir

    2014-03-01

    Full Text Available Some hexanamide-mono and di-linoleniate esters were prepared by the reaction of linolenic acid and hexanamide (derived from the reaction of hexanoic acid and diethanolamine. The chemical structure for the newly prepared hexanamide-mono and di-linoleniate esters were elucidated using elemental analysis, (FTIR, H 1NMR and chemical ionization mass spectra (CI/Ms spectroscopic techniques. The results of the spectroscopic analysis indicated that they were prepared through the right method and they have high purity. The new prepared esters have high biodegradability and lower toxicity (environmentally friendly so they were evaluated as a synthetic-based mud (ester-based mud for oil-well drilling fluids. The evaluation included study of the rheological properties, filtration and thermal properties of the ester based-muds formulated with the newly prepared esters compared to the reference commercial synthetic-based mud.

  20. Urban Fluxes Monitoring and Development of Planning Strategies to Reduce Ghg Emissions in AN European City

    Science.gov (United States)

    Marras, S.; Sirca, C.; Bellucco, V.; Falk, M.; Pyles, R. D.; Snyder, R. L.; Paw U, K.; Duce, P.; Blecic, I.; Trunfio, G. A.; Cecchini, A.; Spano, D.

    2013-12-01

    Cities and human settlements in general are a primary source of emissions that contribute to human-induced climate change. To investigate the impact of an urbanized area on urban metabolism components, an eddy covariance (EC) tower will be set up in a city (Sassari) located in the center of the Mediterranean basin (Sardinia, Italy). The EC tower, as well as a meteorological station and radiometers, will be set up to monitor energy, water, and carbon fluxes in the city center. A GHG emissions inventory will be also compiled to identify the main emission sources. In addition, a modeling framework will be used to study the impact of different urban planning strategies on carbon emission rates. The modeling framework consists of four models to analyze fluxes both at local and municipality scale: (i) a land surface model ACASA (Advanced Canopy-Atmosphere-Soil Algorithm, ACASA) to simulate the urban metabolism components at local scale; (ii) a Cellular Automata model to simulate the urban land-use dynamics in the near future (20-30 years); (iii) a transportation model to estimate the variation of the transportation network load, and (iv) the coupled model WRF-ACASA will be finally used to simulate the urban metabolism components at municipality scale. The participation of local stakeholders will allow the definition of future planning strategies with the aim to identify low carbon emissions strategies. The projects activities, methodologies applied, as well as the preliminary results will be reported here.

  1. Earth Observation in Support of Sustainable Urban Planning: Results of the Dragon-3 Monitor Project

    Science.gov (United States)

    Cartalis, C.; Polydoros, A.; Mavrakou, T.; Asimakopoulos, D. N.

    2016-08-01

    Sustainable urban planning increasingly demands innovative concepts and techniques to obtain up-to-date and area-wide information on the characteristics and development of the urban system. In this paper, a thorough and conclusive presentation is made in terms of the results of the DRAGON-3 MONITOR project as based on the use of Earth Observation. Results refer in particular to a set of EO based dynamic urban indicators (i.e. urban form and expansion, land use/land cover changes, land surface temperature distribution, the presence and strength of urban heat island) with the capacity to describe the state, dynamic changes and interaction of the land and thermal environment in urban areas. Furthermore results are assessed in terms of their potential to operationally support sustainable urban planning and bridge the gap between EO scientists and urban planners. Constraints related to the spatial resolution and revisit time of satellite sensors are discussed as they influence the accuracy and applicability of the indicators. Methodologies to improve the applicability of the indicators are also discussed along with the presentation of the respective results.

  2. Automated radioanalytical system incorporating microwave-assisted sample preparation, chemical separation, and online radiometric detection for the monitoring of total 99Tc in nuclear waste processing streams.

    Science.gov (United States)

    Egorov, Oleg B; O'Hara, Matthew J; Grate, Jay W

    2012-04-03

    An automated fluidic instrument is described that rapidly determines the total (99)Tc content of aged nuclear waste samples, where the matrix is chemically and radiologically complex and the existing speciation of the (99)Tc is variable. The monitor links microwave-assisted sample preparation with an automated anion exchange column separation and detection using a flow-through solid scintillator detector. The sample preparation steps acidify the sample, decompose organics, and convert all Tc species to the pertechnetate anion. The column-based anion exchange procedure separates the pertechnetate from the complex sample matrix, so that radiometric detection can provide accurate measurement of (99)Tc. We developed a preprogrammed spike addition procedure to automatically determine matrix-matched calibration. The overall measurement efficiency that is determined simultaneously provides a self-diagnostic parameter for the radiochemical separation and overall instrument function. Continuous, automated operation was demonstrated over the course of 54 h, which resulted in the analysis of 215 samples plus 54 hly spike-addition samples, with consistent overall measurement efficiency for the operation of the monitor. A sample can be processed and measured automatically in just 12.5 min with a detection limit of 23.5 Bq/mL of (99)Tc in low activity waste (0.495 mL sample volume), with better than 10% RSD precision at concentrations above the quantification limit. This rapid automated analysis method was developed to support nuclear waste processing operations planned for the Hanford nuclear site.

  3. Environmental assessment and planning at Mound - environmental monitoring capabilities and personnel profiles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Through its long experience with radioactive materials, Mound has developed a comprehensive, routine, offsite, environmental surveillance program to safeguard its employees, the physical plant, and the integrity of the surrounding environment from any potential adverse effects of its widely diverse operations. Effluent samples are analyzed for radiological and non-radiological parameters. The environment surrounding Mound Facility is continuously monitored - air, water, foodstuffs, vegetation, soil, and silt samples are analyzed to ensure that radioisotopic concentrations and other possible pollutants are well within the stringent standards adopted by the Department of Energy, the Environmental Protection Agencies (both federal and state), and various regional and local agencies. Moreover, this environmental surveillance program has been designed to ensure that the facility is designed, constructed, managed, operated, and maintained in a manner that continues to meet all federal, state, and local standards for environmental protection. Work in environmental science has been broadened to assess environmental factors associated with various aspects of the National Energy Plan. Both the management and staff at Mound have undertaken a firm commitment to make Mound`s environmental monitoring capabilities available to agencies that have the responsibility for the resolution of important environmental issues.

  4. NOAA's Role in Sustaining Global Ocean Observations: Future Plans for OAR's Ocean Observing and Monitoring Division

    Science.gov (United States)

    Todd, James; Legler, David; Piotrowicz, Stephen; Raymond, Megan; Smith, Emily; Tedesco, Kathy; Thurston, Sidney

    2017-04-01

    The Ocean Observing and Monitoring Division (OOMD, formerly the Climate Observation Division) of the National Oceanic and Atmospheric Administration (NOAA) Climate Program Office provides long-term, high-quality global observations, climate information and products for researchers, forecasters, assessments and other users of environmental information. In this context, OOMD-supported activities serve a foundational role in an enterprise that aims to advance 1) scientific understanding, 2) monitoring and prediction of climate and 3) understanding of potential impacts to enable a climate resilient society. Leveraging approximately 50% of the Global Ocean Observing System, OOMD employs an internationally-coordinated, multi-institution global strategy that brings together data from multiple platforms including surface drifting buoys, Argo profiling floats, flux/transport moorings (RAMA, PIRATA, OceanSITES), GLOSS tide gauges, SOOP-XBT and SOOP-CO2, ocean gliders and repeat hydrographic sections (GO-SHIP). OOMD also engages in outreach, education and capacity development activities to deliver training on the social-economic applications of ocean data. This presentation will highlight recent activities and plans for 2017 and beyond.

  5. Safety and quality assurance of chemotherapeutic preparations in a hospital production unit: acceptance sampling plan and economic impact.

    Science.gov (United States)

    Paci, A; Borget, I; Mercier, L; Azar, Y; Desmaris, R P; Bourget, P

    2012-06-01

    The opportunity to apply a sampling plan was evaluated. Costs were computed by a microcosting study. In 2003, a sampling plan was defined to reduce the number of chemotherapy quality controls while preserving the same level of quality. Recent qualitative and quantitative changes led us to define a second sampling plan supplemented by an economic evaluation to determine the cost and cost-savings of quality control. The study considers preparation produced during four semesters classified into three groups. The first one includes drugs produced below 200 batches a semester. Group 2, those for which the lot of preparation lots would have been rejected twice among these four semesters. Group 3, those would have been accepted (≥3 'acceptable lot'). A single sampling plan by attributes was applied to this group with an acceptance quality level of 1.65% and a lot tolerance percent defective below 5%. A micro-costing study was conducted on quality control, from the sampling to the validation of the results. Among 39 cytotoxic drugs, 11 were sampled which enabled to avoid a mean of 17,512 control assays per year. Each batch of the 28 non-sampled drugs was however analyzed. Costs were estimated at 2.98€ and 5.25€ for control assays depending of the analytical method. The savings from the application of the sampling plans was 153,207€ in 6 years. The sampling plan allowed maintaining constancy in number of controls and the level of quality with significant costsavings, despite a substantial increase in drugs to assay and in the number of preparations produced.

  6. The Flexible Solar Utility. Preparing for Solar's Impacts to Utility Planning and Operations

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, John [Solar Electric Power Association (SEPA), Washington, DC (United States); Davidovich, Ted [Solar Electric Power Association (SEPA), Washington, DC (United States); Cory, Karlynn [National Renewable Energy Lab. (NREL), Golden, CO (United States); Aznar, Alexandra [National Renewable Energy Lab. (NREL), Golden, CO (United States); McLaren, Joyce [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This paper seeks to provide a flexible utility roadmap for identifying the steps that need to be taken to place the utility in the best position for addressing solar in the future. Solar growth and the emergence of new technologies will change the electric utility of tomorrow. Although not every utility, region, or market will change in the same way or magnitude, developing a path forward will be needed to reach the Electric System of the Future in the coming decades. In this report, a series of potential future states are identified that could result in drastically different energy mixes and profiles: 1) Business as Usual, 2) Low Carbon, Centralized Generation, 3) Rapid Distributed Energy Resource Growth, 4) Interactivity of Both the Grid and Demand, and 5) Grid or Load Defection. Complicating this process are a series of emerging disruptions; decisions or events that will cause the electric sector to change. Understanding and preparing for these items is critical for the transformation to any of the future states to be successful. Predicting which future state will predominate 15 years from now is not possible; however, utilities still will need to look ahead and try to anticipate how factors will impact their planning, operations, and business models. In order to dig into the potential transformations facing the utility industry, the authors conducted a series of utility interviews, held a working session at a major industry solar conference, and conducted a quantitative survey. To focus conversations, the authors leveraged the Rapid Distributed Energy Resource (DER) Growth future to draw out how utilities would have to adapt from current processes and procedures in order to manage and thrive in that new environment. Distributed solar was investigated specifically, and could serve as a proxy resource for all distributed generation (DG). It can also provide the foundation for all DERs.

  7. Telemedicine consulting in the patient preparation and planning of prosthetic tooth replacement.

    Science.gov (United States)

    Mladenović, Dragan; Tosić, Goran; Zivković, Dusan; Djindjić, Natasa; Mladenović, Lidija; Mladenović, Sanja; Marković, Ivana

    2013-09-01

    In the management of edentulous spaces, there is a permanent need of a dentist-prosthetician in charge to consult other specialists. Modern telemedicine, based on powerful computer and telecomunication systems, offers an adequate answer to these challenges, being able to transfer and obtain clinical data and consultation information over large distances. Using smartphone or a computer, the teleconsultant acces the system, downloads and review the data and photographs and gave suggestions. The system then enables direct, real time contact with the consultant, chat, or directs them to contact each other by phone. We presented telemedicine consulting in the patient preparation and planning of prosthetic tooth replacement in 3 cases with different teleconsultation requirements: the first case for prosthetic rehabilitation of his upper teeth, the second one for prosthetic management of his partial edentulousness and "a growth on his gums" in the vestibular region of the frontal teeth and the third one for prosthetic management of total edentulousness of her upper jaw. We used the system of telemedicine in dentistry, established at the Faculty of Medicine in Kosovska Mitrovica. The operation was based on the computer application system XPA3 Online, computer networking and mobile smartphone network. All consultations were succefull with no need for further procedures in regional center. The use of a mobile smartphone has brought about the mobility and availability of teleconsultant specialists in an extent never seen before. Prostheticians are thus able to offer better service to their patients and improve the quality of management of partially or totally edentulous patients, especially in rural areas.

  8. Telemedicine consulting in the patient preparation and planning of prosthetic tooth replacement

    Directory of Open Access Journals (Sweden)

    Mladenović Dragan

    2013-01-01

    Full Text Available Introduction. In the management of edentulous spaces, there is a permanent need of a dentist-prosthetician in charge to consult other specialists. Modern telemedicine, based on powerful computer and telecomunication systems, offers an adequate answer to these challenges, being able to transfer and obtain clinical data and consultation information over large distances. Using smartphone or a computer, the teleconsultant acces the system, downloads and review the data and photographs and gave suggestions. The system then enables direct, real time contact with the consultant, chat, or directs them to contact each other by phone. Case report. We presented telemedicine consulting in the patient preparation and planning of prosthetic tooth replacement in 3 cases with different teleconsultation requirements: the first case for prosthetic rehabilitation of his upper teeth, the second one for prosthetic management of his partial edentulousness and “a growth on his gums” in the vestibular region of the frontal teeth and the third one for prosthetic management of total edentulousness of her upper jaw. We used the system of telemedicine in dentistry, established at the Faculty of Medicine in Kosovska Mitrovica. The operation was based on the computer application system XPA3 Online, computer networking and mobile smartphone network. All consultations were succefull with no need for further procedures in regional center. Conclusion. The use of a mobile smartphone has brought about the mobility and availability of teleconsultant specialists in an extent never seen before. Prostheticians are thus able to offer better service to their patients and improve the quality of management of partially or totally edentulous patients, especially in rural areas.

  9. Some guidance on preparing validation plans for the DART Full System Models.

    Energy Technology Data Exchange (ETDEWEB)

    Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy (Sandia National Laboratories, Albuquerque, NM)

    2009-03-01

    Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.

  10. Seeps and springs sampling and analysis plan for the environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and operated by Martin Marietta Energy Systems, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources.

  11. Doing it Live! Planning and Preparing for a Live Drama Episode: A Case Study of 'The Bill' (ITV, 2005

    Directory of Open Access Journals (Sweden)

    Joanna MacDonnell

    2013-12-01

    Full Text Available Over the last decade there has been a move towards live episodes of popular television dramas and soap operas in the UK being used to celebrate programme and channel anniversaries. This paper, written by a member of the production team is focused on the ‘behind the scenes’ preparation and subsequent broadcast of the live episode of British police drama The Bill on September 22nd 2005. This live episode became a landmark broadcast as it was the first time that dramatic stunt sequences had been performed live. This article will be supported with examples from the original planning documentation and rehearsal photographs and will examine the production culture in the planning and preparation of the episode. It will also reveal some of the trickery used to execute the stunts, will discuss the difficulties experienced during the live episode and how problems were overcome. 

  12. 78 FR 13712 - U.S. Nuclear Regulatory Commission Planned Monitoring Activities for F-Area Tank Farm at the...

    Science.gov (United States)

    2013-02-28

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION U.S. Nuclear Regulatory Commission Planned Monitoring Activities for F-Area Tank Farm at the Savannah River Site, Revision 0 AGENCY: Nuclear Regulatory Commission. ACTION: Document issuance....

  13. Parallel preparation of plan-view transmission electron microscopy specimens by vapor-phase etching with integrated etch stops

    Energy Technology Data Exchange (ETDEWEB)

    English, Timothy S., E-mail: englisht@stanford.edu [Department of Mechanical Engineering, Stanford University, Stanford, CA 94305 (United States); Provine, J [Department of Mechanical Engineering, Stanford University, Stanford, CA 94305 (United States); Marshall, Ann F.; Koh, Ai Leen [Stanford Nano Shared Facilities, Stanford University, Stanford, CA 94305 (United States); Kenny, Thomas W. [Department of Mechanical Engineering, Stanford University, Stanford, CA 94305 (United States)

    2016-07-15

    Specimen preparation remains a practical challenge in transmission electron microscopy and frequently limits the quality of structural and chemical characterization data obtained. Prevailing methods for thinning of specimens to electron transparency are serial in nature, time consuming, and prone to producing artifacts and specimen failure. This work presents an alternative method for the preparation of plan-view specimens using isotropic vapor-phase etching with integrated etch stops. An ultrathin amorphous etch-stop layer simultaneously serves as an electron transparent support membrane whose thickness is defined by a controlled growth process such as atomic layer deposition with sub-nanometer precision. This approach eliminates the need for mechanical polishing or ion milling to achieve electron transparency, and reduces the occurrence of preparation induced artifacts. Furthermore, multiple specimens from a plurality of samples can be thinned in parallel due to high selectivity of the vapor-phase etching process. These features enable dramatic reductions in preparation time and cost without sacrificing specimen quality and provide advantages over wet etching techniques. Finally, we demonstrate a platform for high-throughput transmission electron microscopy of plan-view specimens by combining the parallel preparation capabilities of vapor-phase etching with wafer-scale micro- and nanofabrication. - Highlights: • Parallel thinning of plan-view specimens enables high-throughput microscopy studies. • The support membrane thickness is controlled with sub-nanometer precision. • No physical etching (polishing, dimpling, or ion milling) is required. • Large area and uniformly thin specimens are suitable for Cs-corrected HRTEM. • Wafer-scale integration enables custom specimens for in situ experiments.

  14. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs.

  15. Web Based GIS System For Monitoring the Implementation of County Integrated Development Plan a Case Study of Nandi County, Kenya.

    Science.gov (United States)

    Kurui, P. K.; Mutua, F.

    2016-12-01

    The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.

  16. Environmental radiation monitoring plan for depleted uranium and beryllium areas, Yuma Proving Ground

    Energy Technology Data Exchange (ETDEWEB)

    Ebinger, M.H.; Hansen, W.R.

    1994-05-11

    This Environmental Radiation Monitoring Plan (ERM) discusses sampling soils, vegetation, and biota for depleted uranium (DU) and beryllium (Be) at Yuma Proving Ground (YPG). The existing ERM plan was used and modified to more adequately assess the potential of DU and Be migration through the YPG ecosystem. The potential pathways for DU and Be migration are discussed and include soil to vegetation, soil to animals, vegetation to animals, animals to animals, and animals to man. Sample collection will show DU deposition and will be used to estimate DU migration. The number of samples from each area varies and depends on if the firing range of interest is currently used for DU testing (GP 17A) or if the range is not used currently for DU testing (GP 20). Twenty to thirty-five individual mammals or lizards will be sampled from each transect. Air samples and samples of dust in the air fall will be collected in three locations in the active ranges. Thirty to forty-five sediment samples will be collected from different locations in the arroys near the impact areas. DU and Be sampling in the Hard Impact and Soft Impact areas changed only slightly from the existing ERM. The modifications are changes in sample locations, addition of two sediment transport locations, addition of vegetation samples, mammal samples, and air sampling from three to five positions on the impact areas. Analysis of samples for DU or total U by inductively-coupled mass spectroscopy (ICP/MS), cc spectroscopy, neutron activation analysis (NAA), and kinetic phosphorimetric analysis (KPA) are discussed, and analysis for Be by ICP/MS are recommended. Acquiring total U (no isotope data) from a large number of samples and analysis of those samples with relatively high total U concentrations results in fewer isotopic identifications but more information on U distribution. From previous studies, total U concentrations greater than about 3 times natural background are usually DU by isotopic confirmation.

  17. Utility of the theory of planned behavior to predict nursing staff blood pressure monitoring behaviours.

    Science.gov (United States)

    Nelson, Joan M; Cook, Paul F; Ingram, Jennifer C

    2014-02-01

    To evaluate constructs from the theory of planned behavior (TPB, Ajzen 2002) - attitudes, sense of control, subjective norms and intentions - as predictors of accuracy in blood pressure monitoring. Despite numerous initiatives aimed at teaching blood pressure measurement techniques, many healthcare providers measure blood pressures incorrectly. Descriptive, cohort design. Medical assistants and licensed practical nurses were asked to complete a questionnaire on TPB variables. These nursing staff's patients had their blood pressures measured and completed a survey about techniques used to measure their blood pressure. We correlated nursing staff's responses on the TBP questionnaire with their intention to measure an accurate blood pressure and with the difference between their actual blood pressure measurement and a second measurement taken by a researcher immediately after the clinic visit. Patients' perceptions of MAs' and LPNs' blood pressure measurement techniques were examined descriptively. Perceived control and social norm predicted intention to measure an accurate blood pressure, with a negative relationship between knowledge and intention. Consistent with the TPB, intention was the only significant predictor of blood pressure measurement accuracy. Theory of planned behavior constructs predicted the healthcare providers' intention to measure blood pressure accurately and intention predicted the actual accuracy of systolic blood pressure measurement. However, participants' knowledge about blood pressure measurement had an unexpected negative relationship with their intentions. These findings have important implications for nursing education departments and organisations which traditionally invest significant time and effort in annual competency training focused on knowledge enhancement by staff. This study suggests that a better strategy might involve efforts to enhance providers' intention to change, particularly by changing social norms or increasing

  18. Comparison of bird community indices for riparian restoration planning and monitoring

    Science.gov (United States)

    Young, Jock S.; Ammon, Elisabeth M.; Weisburg, Peter J.; Dilts, Thomas E.; Newton, Wesley E.; Wong-Kone, Diane C.; Heki, Lisa G.

    2013-01-01

    The use of a bird community index that characterizes ecosystem integrity is very attractive to conservation planners and habitat managers, particularly in the absence of any single focal species. In riparian areas of the western USA, several attempts at arriving at a community index signifying a functioning riparian bird community have been made previously, mostly resorting to expert opinions or national conservation rankings for species weights. Because extensive local and regional bird monitoring data were available for Nevada, we were able to develop three different indices that were derived empirically, rather than from expert opinion. We formally examined the use of three species weighting schemes in comparison with simple species richness, using different definitions of riparian species assemblage size, for the purpose of predicting community response to changes in vegetation structure from riparian restoration. For the three indices, species were weighted according to the following criteria: (1) the degree of riparian habitat specialization based on regional data, (2) the relative conservation ranking of landbird species, and (3) the degree to which a species is under-represented compared to the regional species pool for riparian areas. To evaluate the usefulness of these indices for habitat restoration planning and monitoring, we modeled them using habitat variables that are expected to respond to riparian restoration efforts, using data from 64 sampling sites in the Walker River Basin in Nevada and California. We found that none of the species-weighting schemes performed any better as an index for evaluating overall habitat condition than using species richness alone as a community index. Based on our findings, the use of a fairly complete list of 30–35 riparian specialists appears to be the best indicator group for predicting the response of bird communities to the restoration of riparian vegetation.

  19. 76 FR 4120 - The National Antimicrobial Resistance Monitoring System Strategic Plan 2011-2015; Request for...

    Science.gov (United States)

    2011-01-24

    ... HUMAN SERVICES Food and Drug Administration The National Antimicrobial Resistance Monitoring System... public comment of a document for The National Antimicrobial Resistance Monitoring System (NARMS) entitled... systems monitoring antimicrobial resistance in other countries. Foodborne diseases are an important cause...

  20. 76 FR 72431 - Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness...

    Science.gov (United States)

    2011-11-23

    ... Plans and Preparedness in Support of Nuclear Power Plants, NUREG-0654/FEMA-REP-1, Supplement 4 and FEMA... Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants,'' NUREG-0654/FEMA-REP- 1, Revision 1 (NUREG-0654), and the Radiological Emergency Preparedness Program Manual (the...

  1. Improving health aid for a better planet: The planning, monitoring and evaluation tool (PLANET).

    Science.gov (United States)

    Sridhar, Devi; Car, Josip; Chopra, Mickey; Campbell, Harry; Woods, Ngaire; Rudan, Igor

    2015-12-01

    International development assistance for health (DAH) quadrupled between 1990 and 2012, from US$ 5.6 billion to US$ 28.1 billion. This generates an increasing need for transparent and replicable tools that could be used to set investment priorities, monitor the distribution of funding in real time, and evaluate the impact of those investments. In this paper we present a methodology that addresses these three challenges. We call this approach PLANET, which stands for planning, monitoring and evaluation tool. Fundamentally, PLANET is based on crowdsourcing approach to obtaining information relevant to deployment of large-scale programs. Information is contributed in real time by a diverse group of participants involved in the program delivery. PLANET relies on real-time information from three levels of participants in large-scale programs: funders, managers and recipients. At each level, information is solicited to assess five key risks that are most relevant to each level of operations. The risks at the level of funders involve systematic neglect of certain areas, focus on donor's interests over that of program recipients, ineffective co-ordination between donors, questionable mechanisms of delivery and excessive loss of funding to "middle men". At the level of managers, the risks are corruption, lack of capacity and/or competence, lack of information and /or communication, undue avoidance of governmental structures / preference to non-governmental organizations and exclusion of local expertise. At the level of primary recipients, the risks are corruption, parallel operations / "verticalization", misalignment with local priorities and lack of community involvement, issues with ethics, equity and/or acceptability, and low likelihood of sustainability beyond the end of the program's implementation. PLANET is intended as an additional tool available to policy-makers to prioritize, monitor and evaluate large-scale development programs. In this, it should complement

  2. INFORMATION SYSTEM FOR PLANNING, ACCOUNTING, MONITORING AND MANAGEMENT OF INNOVATION IN THE UKRAINIAN HEALTH CARE SPHERE

    Directory of Open Access Journals (Sweden)

    A. E. Gorban

    2016-06-01

    Full Text Available Each year, research teams of organizations, institutions and enterprises from the sphere of the Ministry of Public Health (MPH of Ukraine carried out more than 200 scientific research works (SRW, the results of which creates innovative products (new method, a technique, a compound device, and the like. Growth in the medical information obtained in the performance of SRW results in the need to speed up the processing and transfer of innovation activity agents. This problem can be effectively addressed through the use of automated information systems. Timely analysis of the incoming information, particularly at the planning stage of SRW, and forecasting its effectiveness permit to avoid mistakes in management decisions. In this regard, relevant and timely is the development of automated information systems and modern information technologies for collecting, processing and analyzing information. The article presents the scientific basis of development and the creation of an automated information system for recording, monitoring and forecasting of the effectiveness of innovation. The basic principles to be met by the developed system are systemic, development, interoperability, standardization and efficiency, data security and reliability, agility, visibility and intuitive user experience, ease of use and minimal sufficient of information support.

  3. Combining qualitative and quantitative spatial and temporal information in a hierarchical structure: Approximate reasoning for plan execution monitoring

    Science.gov (United States)

    Hoebel, Louis J.

    1993-01-01

    The problem of plan generation (PG) and the problem of plan execution monitoring (PEM), including updating, queries, and resource-bounded replanning, have different reasoning and representation requirements. PEM requires the integration of qualitative and quantitative information. PEM is the receiving of data about the world in which a plan or agent is executing. The problem is to quickly determine the relevance of the data, the consistency of the data with respect to the expected effects, and if execution should continue. Only spatial and temporal aspects of the plan are addressed for relevance in this work. Current temporal reasoning systems are deficient in computational aspects or expressiveness. This work presents a hybrid qualitative and quantitative system that is fully expressive in its assertion language while offering certain computational efficiencies. In order to proceed, methods incorporating approximate reasoning using hierarchies, notions of locality, constraint expansion, and absolute parameters need be used and are shown to be useful for the anytime nature of PEM.

  4. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Peelle, E.; Schweitzer, M.; Scharre, P.; Pressman, B.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possible through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.

  5. A novel website to prepare diverse older adults for decision making and advance care planning: a pilot study.

    Science.gov (United States)

    Sudore, Rebecca L; Knight, Sara J; McMahan, Ryan D; Feuz, Mariko; Farrell, David; Miao, Yinghui; Barnes, Deborah E

    2014-04-01

    We have reconceptualized advance care planning (ACP) as a multistep process focused on preparing patients with skills needed for communication and in-the-moment decision making. To operationalize this paradigm, we created an easy-to-use ACP website (prepareforyourcare.org) based on a theoretical framework of behavior change and pilot-tested its efficacy to engage older adults in ACP. At baseline and 1 week after viewing the PREPARE website, we assessed behavior change in ACP by using a validated survey that includes Process Measures (knowledge, contemplation, self-efficacy, and readiness, 5-point Likert scales) and Action Measures (yes/no whether an ACP behavior was completed). We also assigned participants into behavior change stages (i.e., precontemplation, contemplation, preparation, action, maintenance) and determined the percentage of participants who moved from precontemplation at baseline to higher stages at 1 week. We also assessed PREPARE ease-of-use (10-point scale, 10 being the easiest). Changes were assessed with Wilcoxon signed rank sum tests and McNemar's tests. Mean age of the participants was 68.4 years (SD 6.6), and 65% were nonwhite. Behavior Change Process Measures average Likert scores increased from 3.1 (0.9) to 3.7 (0.7), P decision making significantly improves engagement in the process of ACP and behavior change. A clinical trial of PREPARE is currently underway. Published by Elsevier Inc.

  6. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  7. Text Linguistics in Research Papers Prepared by University Students: Teaching through Lesson Plans and Textbooks

    Directory of Open Access Journals (Sweden)

    Manuel Albarrán-Santiago

    2015-01-01

    Full Text Available This research project revolves around the properties of text linguistics under a qualitative approach.  The author analyzed drafts of a research paper by two university students as well as lesson plans and textbooks of high school Spanish Language and Literature courses and lesson plans of courses from the Licentiate degree in Education.  According to the information from the drafts, students struggle with coherence and cohesion in writing; however, they succeed in choosing the correct language for the type of writing.  Difficulties are most likely due to fact that this topic is not included in secondary education plans and is not commonly addressed in textbooks or university classes.  In conclusion, teachers should include the properties of text linguistics in their lesson plans in order to help students overcome these difficulties.

  8. Monitoring of Literacy Programmes. Planning, Administration and Monitoring in Literacy; Portfolio of Literacy Materials, Series 2, Monograph 3.

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    The third of three related monographs resulting from a Unesco regional literacy workshop in Asia, this booklet provides information useful to those designing national programs in literacy training for underdeveloped and developing nations. The booklet is divided into four parts. The first part discusses the monitoring of literacy programs,…

  9. Assessing teratogenicity of antiretroviral drugs: monitoring and analysis plan of the Antiretroviral Pregnancy Registry.

    Science.gov (United States)

    Covington, Deborah L; Tilson, Hugh; Elder, Jenna; Doi, Peggy

    2004-08-01

    This paper describes the Antiretroviral Pregnancy Registry's (APR) monitoring and analysis plan. APR is overseen by a committee of experts in obstetrics, pediatrics, teratology, infectious diseases, epidemiology and biostatistics from academia, government and the pharmaceutical industry. APR uses a prospective exposure-registration cohort design. Clinicians voluntarily register pregnant women with prenatal exposures to any antiretroviral therapy and provide fetal/neonatal outcomes. A birth defect is any birth outcome > or = 20 weeks gestation with a structural or chromosomal abnormality as determined by a geneticist. The prevalence is calculated by dividing the number of defects by the total number of live births and is compared to the prevalence in the CDC's population-based surveillance system. Additionally, first trimester exposures, in which organogenesis occurs, are compared with second/third trimester exposures. Statistical inference is based on exact methods for binomial proportions. Overall, a cohort of 200 exposed newborns is required to detect a doubling of risk, with 80% power and a Type I error rate of 5%. APR uses the Rule of Three: immediate review occurs once three specific defects are reported for a specific exposure. The likelihood of finding three specific defects in a cohort of < or = 600 by chance alone is less than 5% for all but the most common defects. To enhance the assurance of prompt, responsible, and appropriate action in the event of a potential signal, APR employs the strategy of 'threshold'. The threshold for action is determined by the extent of certainty about the cases, driven by statistical considerations and tempered by the specifics of the cases. Copyright 2004 John Wiley & Sons, Ltd.

  10. A Monitoring System for Mitigation Planning: The Case of "Bagnaschino" Landslide in Northern Italy

    Directory of Open Access Journals (Sweden)

    Giuliani Andrea

    2010-01-01

    Full Text Available Problem statement: The Bagnaschino landslide occurred in November 1994 that caused extensive floods and many landslides all over northern Italy. In southern Piedmont, the Casotto River (Cuneo Province damaged many kilometers of provincial road and the river was dammed by this landslide. The landslide involves an area of about 100 thousands m3, but a good knowledge of the landslide is however still missing because of the complexity of the phenomenon. Approach: The aim of this study has been to collect and reorganize available data with the georeferencing in a GIS project of the information taken from investigations of the last years. An electric tomography and seismic reflection were carried out above the landslide body to enrich the available data. The final goal has been to well-know the sliding surfaces and the different processes involved in the slope deformation. Results: The research has redefined the geological base model, that was been the local stratigraphy is represented by an heterogeneous deposit of loose materials (20-30 m, with abundant silty-clayey matrix. The bedrock is composed by fractured micashists, metabolites and green stones. The landslide has shown many surfaces of movement at different depths and continuous reactivations, but the triggering mechanism is still not clarified due to the complex geological setting. Conclusion: Rock masses observed in correspondence of the road and the river bed has suggested that the main sliding surface did not involve the lower part of the slope and that the road is built on stable bedrock. The intention will be to continue the monitoring of the landslide in order to give to the Local Authorities the correct instruments for planning mitigation projects.

  11. A management information system to plan and monitor the delivery of health-care services in government hospitals in India.

    Science.gov (United States)

    Ramani, K V

    2004-01-01

    Governments all over the world are getting increasingly concerned about their ability to meet their social obligations in the health sector. In this paper, we discuss the design and development of a management information system (MIS) to plan and monitor the delivery of healthcare services in government hospitals in India. Our MIS design is based on an understanding of the working of several municipal, district, and state government hospitals. In order to understand the magnitude and complexity of various issues faced by the government hospitals, we analyze the working of three large tertiary care hospitals administered by the Ahmedabad Municipal Corporation. The hospital managers are very concerned about the lack of hospital infrastructure and resources to provide a satisfactory level of service. Equally concerned are the government administrators who have limited financial resources to offer healthcare services at subsidized rates. A comprehensive hospital MIS is thus necessary to plan and monitor the delivery of hospital services efficiently and effectively.

  12. Characterize and explore potential sites and prepare research and development plan (site investigation study). Final draft. Task 2. Milestone report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-01

    Phase II of a 5-phase overall compressed air energy storage (CAES) development program was performed to characterize and explore potential CAES sites and to prepare a research and development plan. This volume for Phase II activities contains an evaluation of the suitability of seven selected sites to undergo field drilling and air injection testing; a bibliography; results of a literature search on the effects of air injection of aquifer-caprock well systems; reservoir data for the sites; cost estimates; and predicted potential risks from a CAES plant. (LCL)

  13. Missouri River Emergent Sandbar Habitat Monitoring Plan - A Conceptual Framework for Adaptive Management

    Science.gov (United States)

    Sherfy, Mark H.; Stucker, Jennifer H.; Anteau, Michael J.

    2009-01-01

    available to quantify changes in managed habitats for least terns and piping plovers, so that management effectiveness can be evaluated. Extremely high flows and flooding of the Missouri River in 1997 created and improved vast amounts of nesting habitat for least terns and piping plovers. Since 1998, there has been an apparent loss and/or degradation of habitat throughout the river system. However, during the same timeframe reservoir water levels have declined, exposing extensive piping plover breeding habitat. For example, 64 percent of adult piping plovers using the Missouri River in 2005 were observed on reservoir habitats, and 43 percent were observed on Lake Sakakawea (Threatened and Endangered Species Section, Omaha District, U.S. Army Corps of Engineers, unpub. data, 2006). Given the vast dynamics of this river and reservoir system, systemwide monitoring of habitat is clearly needed for the U.S. Army Corps of Engineers (USACE) to employ adaptive management (with respect to river operations) to provide most optimal conditions for the maintenance of breeding habitat of least terns and piping plovers. As a result of this need, the U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, began work on a habitat monitoring plan in 2005 as a conceptual framework for adaptive management.

  14. Improving Air Force Command and Control Through Enhanced Agile Combat Support Planning, Execution, Monitoring, and Control Processes

    Science.gov (United States)

    2012-01-01

    assess, plan, execute [ MAPE ] model) are an integral part of Air Force enterprise and joint command and control capability. In the revised copy of Air...operations. 2 Similar in construct, the Air Force uses the MAPE model when discussing ACS processes. 3 In the revised copy of AFDD 1, dated November 12, 2010...MAJCOM major command xliv Improving Air Force C2 Through Enhanced Agile Combat Support Processes MAJCOM/CC commander, major command MAPE monitor, assess

  15. Chemical hygiene plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This plan was written to administer and monitor safety measures and chemical hygiene principles in the TAC Uranium Mill Tailing Remedial Action Project sample preparation facility in Albuquerque, New Mexico. It applies to toxic and/or hazardous materials to radioactive materials.

  16. Community College Succession Planning: Preparing the Next Generation of Women for Leadership Roles

    Science.gov (United States)

    Luzebetak, Angela Kaysen

    2010-01-01

    The purpose of this study was to explore strategies to enable community colleges to develop and cultivate women for leadership roles through succession planning. According to the American Association of Community Colleges (AACC), the pace of administrative and other key staff retirements exceeds the pace at which these positions are being…

  17. National technology needs assessment for the preparation and implementation of climate change action plans

    Energy Technology Data Exchange (ETDEWEB)

    Berkel, C.W.M. van; Blonk, T.J.; Westra, C.A.

    1996-12-31

    In the United National Framework Convention on Climate Change (FCCC) it is recognised that developed countries have a responsibility in assisting developing countries and countries in economic transition in building a national capacity for the development, acquisition and transfer of Climate-related Technologies (CTs). Such assistance is most likely to be successful once it is tailored to the results of a sound assessment of the country`s development needs and once the results of this assessment have been endorsed by the most important stakeholders in the country. Recent insight in the opportunities and constraints for National (technology) Needs Assessments (NNAs) as planning tool for both capacity building and technology transfer regarding Environmentally Sound Technologies (ESTs) is applied here to propose a participatory Climate Change Action Planning (CCAP) process. This participatory planning process is thought to serve the dual objective of defining a national Climate Change Action Plan (CCAP) while at the same time contributing to the creation of a broad supportive basis for its acceptance and implementation among stakeholders in the developing country.

  18. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY III QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  19. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY II QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  20. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY I QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  1. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY IV QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  2. Promoting and Expanding Apprenticeship: A Strategic Plan for Preparing America's Work Force of Tomorrow (Phase I).

    Science.gov (United States)

    Employment and Training Administration (DOL), Washington, DC. Office of Work-Based Learning.

    A strategic plan to strengthen and expand the nation's existing apprenticeship system contains three components: apprenticeship promotion and marketing, national registration and tracking system, and quality. Efforts to promote apprenticeship must involve a two-pronged strategy that seeks both to develop new programs and expose potential program…

  3. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY I QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  4. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY III QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  5. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY II QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  6. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY IV QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  7. 76 FR 75539 - Intent To Prepare an Environmental Impact Statement for the Central Everglades Planning Project...

    Science.gov (United States)

    2011-12-02

    ... Central Everglades Planning Project, Okeechobee, Glades, Martin, Palm Beach, Broward, Miami-Dade and... hydrologically and ecologically connected across more than 200 miles from north to south and across 18,000 square miles of southern Florida. In 2000, the U.S. Congress authorized the Federal government, in...

  8. Experiential Placements: Dissemination and Stakeholder Engagement for Curriculum Planning Action to Prepare Future Pharmacy Professionals

    Science.gov (United States)

    Owen, Susanne; Stupans, Ieva

    2009-01-01

    Preparing graduates for the professions is increasingly recognised as involving a partnership approach to curriculum design, implementation and evaluation. Experiential placements play a critical role in developing discipline-specific knowledge and skills and also generic professional dispositions including relationships, communication, problem…

  9. 28 CFR 20.21 - Preparation and submission of a Criminal History Record Information Plan.

    Science.gov (United States)

    2010-07-01

    ...) General policies on use and dissemination. (1) Use of criminal history record information disseminated to... have the right to audit, monitor and inspect procedures established above. (4) The criminal justice... to be authorized to have direct access to criminal history record information. (ii) Have the right...

  10. Guide for surface coal mine reclamation plans

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-11-15

    The purpose of the guide is to provide a framework for Nova Scotia's coal mining community to consult during reclamation planning and environmental assessment. The guide describe the best management practices for application to surface mine reclamation. Principles of reclamation, standard submission requirements for a reclamation plan, planning for reclamation, landscape design, and revegetation, and methods for site preparation, monitoring, and maintenance are discussed. Backfilling, flooded excavation management, and other options are outlined. The reclamation plan must consider decommissioning of equipment and infrastructure, water retention and treatment ponds, acid rock drainage control and monitoring, site monitoring, watercourse management, and public safety. A glossary is included.

  11. Standard Guide for Preparing Waste Management Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide addresses the development of waste management plans for potential waste streams resulting from decommissioning activities at nuclear facilities, including identifying, categorizing, and handling the waste from generation to final disposal. 1.2 This guide is applicable to potential waste streams anticipated from decommissioning activities of nuclear facilities whose operations were governed by the Nuclear Regulatory Commission (NRC) or Agreement State license, under Department of Energy (DOE) Orders, or Department of Defense (DoD) regulations. 1.3 This guide provides a description of the key elements of waste management plans that if followed will successfully allow for the characterization, packaging, transportation, and off-site treatment or disposal, or both, of conventional, hazardous, and radioactive waste streams. 1.4 This guide does not address the on-site treatment, long term storage, or on-site disposal of these potential waste streams. 1.5 This standard does not purport to address ...

  12. Action for sustainability: preparing an African plan for sustainable building and construction

    CSIR Research Space (South Africa)

    Du Plessis, C

    2005-09-01

    Full Text Available perspectives on structural adjustment. Trenton, N.J. and Asmara, Eritrea: Africa World Press Inc. Museveni, Y. (2004) during the Conference for African Ministers of Finance, Planning and Economic Development, 18 May, 2004, Kampala, Uganda, quoted.... Oxford: Blackwell, pp. 375-393 DBSA (2003) Development Report 2003. Johannesburg: Development Bank of Southern Africa. Dlamini-Zuma, N. (2005) Opening Statemnt by the Minister of Foreign Affiars of the Republic of South Africa, at the South Africa...

  13. Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

    Science.gov (United States)

    Qureshi, Rizwan Hamid; Hughes, Steven P.

    2014-01-01

    The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

  14. Assessment of Understanding: Student Teachers' Preparation, Implementation and Reflection of a Lesson Plan for Science

    Science.gov (United States)

    Juhler, Martin Vogt

    2017-05-01

    Research finds that student teachers often fail to make observable instructional goals, without which a secure bridge between instruction and assessment is precluded. This is one reason that recent reports state that teacher education needs to become better at helping student teachers to develop their thinking about and skills in assessing pupils' learning. Currently in Europe, the Lesson Study method and the Content Representation tool, which both have a specific focus on assessment, have started to address this problem. This article describes and discusses an intervention in which Lesson Study was used in combination with Content Representation in student teachers' field practice. Empirical materials from one group of student teachers were analyzed to illustrate how the student teachers worked with assessment during the planning of a lesson, how they implemented it in a research lesson, and how they used the gathered observations to make claims about assessment aims. The findings suggest that the student teachers placed greater emphasis on assessment through the intervention. However, it is also found that more attention should have been dedicated to the planning phase and that the group did not manage to keep a research focus throughout the Lesson Study process. This suggests that it properly would be beneficial with several planning sessions prior to the research lesson, as well as having an expert teacher leading the Lesson Study.

  15. Facebook tells me so: applying the theory of planned behavior to understand partner-monitoring behavior on Facebook.

    Science.gov (United States)

    Darvell, Millie J; Walsh, Shari P; White, Katherine M

    2011-12-01

    The social networking site (SNS) Facebook is becoming increasingly recognized as a medium through which individuals can investigate and monitor others' activities. However, little is known about whether Facebook monitoring behavior occurs within romantic relationships and, accordingly, the psychological predictors of this behavior. The present study employed an extended theory of planned behavior (TPB) framework including self-esteem, partner trust, and demographic characteristics, to predict frequent Facebook partner-monitoring. Facebook users (N=244) in romantic relationships completed measures assessing the standard TPB constructs (attitude, subjective norm, and perceived behavioral control), additional predictor variables (self-esteem and partner trust), and demographic characteristics (age, gender, relationship length, daily Facebook logins, and time spent per login). One week later, participants reported their level of Facebook partner-monitoring during the previous week. Regression analyses supported the standard TPB constructs of attitude and subjective norm in predicting intentions to engage in frequent Facebook partner-monitoring, with intention, in turn, predicting behavior. Partner trust, but not self-esteem, significantly predicted frequent Facebook partner-monitoring intentions. Of the demographic characteristics, daily Facebook logins significantly predicted both intention and behavior and, unexpectedly, relationship length directly affected behavior. Overall, the current study revealed that frequent Facebook partner-monitoring is influenced by attitudinal, normative, and relational factors and, potentially, increased visits to Facebook. These findings provide a new understanding of an individual's use of the world's leading SNS to monitor their partner's activities and provide a foundation for future studies to investigate the potential negative implications this activity may have for those in romantic relationships.

  16. SU-E-T-76: A Software System to Monitor VMAT Plan Complexity in a Large Radiotherapy Centre

    Energy Technology Data Exchange (ETDEWEB)

    Arumugam, S; Xing, A [Liverpool and Macarthur Cancer Therapy Centres, Sydney, NSW (Australia); Ingham Institute, Sydney, NSW (Australia); Vial, P [Liverpool and Macarthur Cancer Therapy Centres, Sydney, NSW (Australia); Ingham Institute, Sydney, NSW (Australia); Institute of Medical Physics, School of Physics, University of Sydney, Sydney, NSW (Australia); Thwaites, D [Institute of Medical Physics, School of Physics, University of Sydney, Sydney, NSW (Australia); Holloway, L [Liverpool and Macarthur Cancer Therapy Centres, Sydney, NSW (Australia); Ingham Institute, Sydney, NSW (Australia); Institute of Medical Physics, School of Physics, University of Sydney, Sydney, NSW (Australia); Centre for Medical Radiation Physics, University of Wollongong, Wollongong, NSW (Australia)

    2015-06-15

    Purpose: To develop a system that analyses and reports the complexity of Volumetric Modulated Arc Therapy (VMAT) plans to aid in the decision making for streamlining patient specific dosimetric quality assurance (QA) tests. Methods: A software system, Delcheck, was developed in-house to calculate VMAT plan and delivery complexity using the treatment delivery file. Delcheck has the functionality to calculate multiple plan complexity metrics including the Li-Xing Modulation Index (LI-MI), multiplicative combination of Leaf Travel and Modulation Complexity Score (LTMCSv), Monitor Units per prescribed dose (MU/D) and the delivery complexity index (MIt) that incorporates the modulation of dose rate, leaf speed and gantry speed. Delcheck includes database functionality to store and compare plan metrics for a specified treatment site. The overall plan and delivery complexity is assessed based on the 95% conformance limit of the complexity metrics as Similar, More or Less complex. The functionality of the software was tested using 42 prostate conventional, 10 prostate SBRT and 15 prostate bed VMAT plans generated for an Elekta linear accelerator. Results: The mean(σ) of LI-MI for conventional, SBRT and prostate bed plans were 1690(486), 3215.4(1294) and 3258(982) respectively. The LTMCSv of the studied categories were 0.334(0.05), 0.325(0.07) and 0.3112(0.09). The MU/D of the studied categories were 2.4(0.4), 2.7(0.7) and 2.5(0.5). The MIt of the studied categories were 21.6(3.4), 18.2(3.0) and 35.9(6.6). The values of the complexity metrics show that LI-MI appeared to resolve the plan complexity better than LTMCSv and MU/D. The MIt value increased as the delivery complexity increased. Conclusion: The developed software was shown to be working as expected. In studied treatment categories Prostate bed plans are more complex in both plan and delivery and SBRT is more complex in plan and less complex in delivery as demonstrated by LI-MI and MIt. This project was funded

  17. Metering Plan: Monitoring Energy and Potable Water Use in PNNL EMS4 Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Pope, Jason E.

    2012-07-25

    This Plan presents progress toward the metering goals shared by all national laboratories and discusses PNNL's contemporary approach to the installation of new meters. In addition, the Plan discusses the data analysis techniques with which PNNL is working to mature using endless data streams made available as a result of increased meter deployment.

  18. Facilitating food-related planning : Applying metacognition, cue-monitoring, and implementation intentions

    NARCIS (Netherlands)

    Verhoeven, A.A.C.

    2015-01-01

    Implementation intentions are specific if-then plans that can successfully change unwanted habits by linking the critical cue triggering the unwanted behavior to a healthier alternative. For example, in order to consume fewer unhealthy snacks while watching television, a plan could be formulated lik

  19. Final work plan : targeted groundwater sampling and monitoring well installation for potential site reclassification at Barnes, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-07-11

    This ''Work Plan'' outlines the scope of work for a targeted groundwater sampling investigation and monitoring well installation at Barnes, Kansas. This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with the intergovernmental agreement between the KDHE and the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA). Data resulting from the proposed work will be used to determine the hydraulic gradient near the former CCC/USDA facility, delineate the downgradient carbon tetrachloride plume, and determine additional monitoring requirements at Barnes. The overall goal is to establish criteria for monitoring leading to potential site reclassification. The proposed work will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The Farm Service Agency of the USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a ''Master Work Plan'' (Argonne 2002) to provide general guidance for all investigations at former CCC/USDA facilities in Kansas. The ''Master Work Plan'', approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Barnes.

  20. Scientific monitoring plan in support of the selected alternative of the Glen Canyon Dam Long-Term Experimental and Management Plan

    Science.gov (United States)

    Vanderkooi, Scott P.; Kennedy, Theodore A.; Topping, David J.; Grams, Paul E.; Ward, David L.; Fairley, Helen C.; Bair, Lucas S.; Yackulic, Charles B.; Schmidt, John C.; Sankey, Joel B.

    2017-01-18

    IntroductionThe purpose of this document is to describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to the U.S. Department of the Interior (DOI), its bureaus, and to the Glen Canyon Dam Adaptive Management Program (GCDAMP) in support of implementation of the Glen Canyon Dam Long-Term Experimental and Management Plan (LTEMP) (U.S. Department of the Interior, 2016a). The selected alternative identified in the LTEMP Record of Decision (ROD) (U.S. Department of the Interior, 2016b) describes various data collection, analysis, modeling, and interpretation efforts to be conducted by the U.S. Geological Survey’s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), partner agencies, and cooperators that will inform decisions about operations of Glen Canyon Dam and management of downstream resources between 2017 and 2037, the performance period of the LTEMP. General data collection, analysis, modeling, and interpretation activities are described in this science plan, whereas specific monitoring and research activities and detailed study plans are to be described in the GCDAMP’s triennial work plans (TWPs) to be developed by the Bureau of Reclamation and GCMRC with input from partner agencies and cooperators during the LTEMP period, which are to be reviewed and recommended by the GCDAMP and approved by the Secretary of the Interior. The GCDAMP consists of several components, the primary committee being the Adaptive Management Work Group (AMWG). This Federal advisory committee is composed of 25 agencies and stakeholder groups and is chaired by the Secretary of the Interior’s designee. The AMWG makes recommendations to the Secretary of the Interior concerning operations of Glen Canyon Dam and other experimental management actions that are intended to fulfill some obligations of the Grand Canyon Protection Act of 1992. The Technical Work Group (TWG) is a subcommittee of the AMWG and

  1. Spatial planning

    OpenAIRE

    Dimitrov, Nikola; Koteski, Cane

    2016-01-01

    The professional book ,, Space planning "processed chapters on: space, concept and definition of space, space as a system, spatial economics, economic essence of space, space planning, social determinants of spatial planning, spatial planning as a process, factors development and elements in spatial planning, methodology, components and content of spatial planning stages and types of preparation of spatial planning, spatial planning and industrialization, industrialization, urbanization and s...

  2. Spatial planning

    OpenAIRE

    Dimitrov, Nikola; Koteski, Cane

    2016-01-01

    The professional book ,, Space planning "processed chapters on: space, concept and definition of space, space as a system, spatial economics, economic essence of space, space planning, social determinants of spatial planning, spatial planning as a process, factors development and elements in spatial planning, methodology, components and content of spatial planning stages and types of preparation of spatial planning, spatial planning and industrialization, industrialization, urbanization and s...

  3. Implementation of the monitoring Plan of the State and behavior of the systems in the Central Nuclear Almaraz; Implantacion del Plan de Seguimiento del Estado y Comportamiento de Sistemas en la Central Nuclear Almaraz

    Energy Technology Data Exchange (ETDEWEB)

    Montero Puertas, I.; Gonzalez Redondo, R.; Lopez Pozo, A.

    2013-07-01

    This work aims to present the implementation process of the Monitoring of the State and behavior of the systems in the Nuclear plan Almaraz. Will define the scope, process, frequencies and criteria of evaluation of the State and behavior of the systems included in the Plan of reliability, as well as the documentary requirements of this evaluation. Cases will also be collected practical real phenomena detected during monitoring degradation made and will explain the actions taken prior to the failure.

  4. Hydro-seismic-acoustical monitoring of submarine earthquakes preparation: observations and analysis

    Directory of Open Access Journals (Sweden)

    E. V. Sasorova

    2008-01-01

    Full Text Available The results of laboratory experiments on rock sample destruction and the observation data obtained from several series of the hydro-acoustic observations in which the researchers succeeded to register the signals in the critical stage of the earthquake (EQ preparation were compared. According to theoretical research (Alekseev et al., 2001 two distinct dilatant zones occur in the EQ preparation stage. The first one is located around the source and the second one represents the near-surface dilatant zone. Only high-frequency seismic-acoustic signals (SAS radiated from the near-surface dilatant zone do not attenuate completely on the passage through a solid medium. Parameters of the SAS such as the source depth under the ocean floor, frequency maximum and the signal power level were estimated. It was shown that the critical stage of the EQ preparation continues several tens hours and this process has a hierarchical nature. At first the micro-ruptures are formed over a large area. Then the high frequency radiation begins to decrease, the SAS emission area begins to shrink and the micro-earthquakes occur in the area surrounding the epicenter. The obtained results are in close agreement with the theoretical conception about the evolution of the SAS in the surface dilatant zone and with the results of laboratory experiments.

  5. Long-term Monitoring Plan for the Central Nevada Test Area

    Energy Technology Data Exchange (ETDEWEB)

    Hassan, Ahmed E

    2004-01-01

    This report discusses the long-term monitoring strategy developed for the Central Nevada Test Area (CNTA), where the Faultless underground nuclear test was conducted. It includes a thorough literature review of monitoring well network design. A multi-staged approach for development of the long-term monitoring well network for CNTA is proposed, incorporating a number of issues, including uncertainty of the subsurface environment, cost, selection of well locations, etc. The first stage is to use hydrogeologic expertise combined with model simulations and probability based approaches to select the first set of monitoring wells. The second stage will be based on an optimum design methodology that uses a suitable statistical approach, combined with an optimization approach, to augment the initial set of wells and develop the final long-term monitoring network.

  6. Identifying the ‘if’ for ‘if-then’ plans: Combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour

    NARCIS (Netherlands)

    Verhoeven, A.A.C.; Adriaanse, M.A.; Vet, de E.; Fennis, B.M.; Ridder, de D.T.D.

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring,

  7. Identifying the ‘if’ for ‘if-then’ plans : Combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour

    NARCIS (Netherlands)

    Verhoeven, Aukje A C; Adriaanse, Marieke A.; de Vet, Emely; Fennis, Bob M.; de Ridder, Denise T D

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring,

  8. Contaminants Monitoring Plan on the Mark Twain National Wildlife Refuge and Adjacent Locations on the Mississippi River with Proposed 1992 Field Activities

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The goal of the monitoring plan is to provide data to determine if fish, colonial birds, waterfowl, endangered species, and their habitats at and adjacent to Mark...

  9. Inventory and Monitoring Plan for Howland Island, Baker Island, Jarvis Island National Wildlife Refuges; Units of the Pacific Remote Islands Marine National Monuments

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents and prioritizes inventory and monitoring surveys and research currently conducted, and proposed to be conducted, at the Howland Island, Baker...

  10. STRATEGIC PLANNING AT THE ENTERPRISE: APPLICATION OF A METHOD OF THE ANALYSIS OF HIERARCHIES FOR THE STRATEGIC ACTIVITY MONITORING

    Directory of Open Access Journals (Sweden)

    Ilya V. Samarin

    2014-01-01

    Full Text Available The technique of application of a method of the analysis of hierarchiesfor the solution of problems of monitoring of activity of the enterprise onadvance to a strategic objective in the course of implementation of thecurrent medium-term plan is presented. Problems of an assessment of astate and situation forecasting to the termination of the current planningperiod are considered. The matrix method which is the return method ofthe analysis of hierarchies, allowing to estimate and predict a situationwith implementation of the plan in all structures of the enterprise andrealizing procedure of strategic monitoring at the enterprise is developed. Statistical and analytical methods of the solution of a problemof forecasting are presented. For the solution of a task the statisticalmethod developed algorithm of the numerical solution of a task and itsflowchart is submitted. An algorithm for solving the problem of determination of the integral strategic risk the implementation of the set ofevents. Shows an example of solving the problem of determination ofthe degree of achievement of the intermediate objectives for the knownvalues of the degree of implementation of all stipulated by a plan ofactions (works for the six-level hierarchical scheme.

  11. Space Weather Monitors -- Preparing to Distribute Scientific Devices and Classroom Materials Worldwide for the IHY 2007

    Science.gov (United States)

    Scherrer, D. K.; Burress, B.

    2006-05-01

    Stanford's Solar Center, in conjunction with the Space, Telecommunications and Radioscience Laboratory and local educators, have developed inexpensive Space Weather Monitors that students around the world can use to track solar-induced changes to the Earth's ionosphere. Through the United Nations Basic Space Science Initiative (UNBSSI) and the IHY Education and Public Outreach Program, our Monitors have been designated for deployment to 191 countries for the International Heliophysical Year, 2007. In partnership with Chabot Space and Science Center, we are designing and developing classroom and educator support materials to accompany distribution of the monitors worldwide. Earth's ionosphere reacts strongly to the intense x-ray and ultraviolet radiation released by the Sun during solar events and by lightning during thunderstorms. Students anywhere in the world can directly monitor and track these sudden ionospheric disturbances (SIDs) by using a VLF radio receiver to monitor the signal strength from distant VLF transmitters and noting unusual changes as the waves bounce off the ionosphere. High school students "buy in" to the project by building their own antenna, a simple structure costing little and taking a couple hours to assemble. Data collection and analysis are handled by a local PC. Stanford is providing a centralized data repository where students and researchers can exchange and discuss data. Chabot Space & Science Center is an innovative teaching and learning center focusing on astronomy and the space sciences. Formed as a Joint Powers Agency with the City of Oakland (California), the Oakland Unified School District, the East Bay Regional Park District, and in collaboration with the Eastbay Astronomical Society, Chabot addresses the critical issue of broad access to the specialized information and facilities needed to improve K-12 science education and public science literacy. Up to 2,000 K-12 teachers annually take part in Chabot's professional

  12. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A. [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  13. Strategic Plan for inventories and monitoring on National Wildlife Refuges : Adapting to environmental change

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Strategic Plan summarizes and provides a long-term perspective for how the National Wildlife Refuge System will implement a nationally coordinated effort to...

  14. Evaluation of black-billed magpies as monitors of environmental contamination : Work plan 1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Preliminary proposal and work plan for the project "Evaluation of Black-billed Magpies as Indicators of Environmental Contamination at the Rocky Mountain Arsenal"....

  15. Development of an automated sample preparation module for environmental monitoring of biowarfare agents.

    Science.gov (United States)

    Hindson, Benjamin J; Brown, Steve B; Marshall, Graham D; McBride, Mary T; Makarewicz, Anthony J; Gutierrez, Dora M; Wolcott, Duane K; Metz, Thomas R; Madabhushi, Ramakrishna S; Dzenitis, John M; Colston, Billy W

    2004-07-01

    An automated sample preparation module, based upon sequential injection analysis (SIA), has been developed for use within an autonomous pathogen detection system. The SIA system interfaced aerosol sampling with multiplexed microsphere immunoassay-flow cytometric detection. Metering and sequestering of microspheres using SIA was found to be reproducible and reliable, over 24-h periods of autonomous operation. Four inbuilt immunoassay controls showed excellent immunoassay and system stability over five days of unattended continuous operation. Titration curves for two biological warfare agents, Bacillus anthracis and Yersinia pestis, obtained using the automated SIA procedure were shown to be similar to those generated using a manual microtiter plate procedure.

  16. Inventory and Monitoring (I&M) Initiative FY 2012 Annual Report and FY 2013 Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual report describes implementation of the National Wildlife Refuge System's Inventory and Monitoring (I results from all eight regions and the I&M...

  17. Development of a stormwater monitoring plan and geographic information system at Back Bay, Virginia

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The initial objective of the Service's Back Bay Initiative will be to implement the first phase of a multi-year stormwater monitoring study to identify the main...

  18. Inventory and Monitoring Plan for the Alaska Maritime National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This IMP documents the priority inventory, monitoring, and research surveys for the Alaska Maritime NWR. Refuge management prioritizes survey and research efforts in...

  19. Eleventh annual Department of Energy low-level waste management conference. Volume 2: Low-level waste strategy and planning, decontamination and decommissioning, compliance monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-11-01

    Nineteen papers are presented in volume 2. The 11 papers in the LLW Strategy and Planning section discuss plans for disposal facilities in Texas, Pennsylvania, Hanford, the Southwest and Southeast Compacts, and others. Three papers discuss decontamination technology and activities. Environmental monitoring requirements and recommendations at LLW facilities are discussed in 5 papers. Papers have been processed separately for inclusion on the data base.

  20. Long-term Monitoring Plan for the Shoal Underground Nuclear Test

    Energy Technology Data Exchange (ETDEWEB)

    Ahmed Hassan

    2005-02-01

    The flow and transport model of Shoal is used to design a three-well monitoring network to be part of the long-term monitoring network for the site and achieve two objectives: (1) detect the presence of radionuclides in case they migrate to the monitoring well locations, and (2) provide field data to compare with model predictions as part of the model validation process. Using three different quantitative approaches and the numerical groundwater flow and transport model developed for Shoal, three new monitoring well locations were identified from 176 different networks. In addition to the quantitative analyses using the numerical model, the development of the monitoring network for Shoal will also be subject to qualitative hydrogeologic interpretation during implementation. information will only be available during the fieldwork, it will be incorporated in the monitoring well design at the time of well installation. Finally, it should be noted that the CADD-CAP for Shoal, including the compliance boundary, is not yet approved. Should the compliance boundary change from the 1,000-year MCL contaminant boundary, well locations may also need to change. However, the analysis reported here provides a number of alternatives with reasonable detection efficiency.

  1. A detection-level hazardous waste ground-water monitoring compliance plan for the 200 areas low-level burial grounds and retrievable storage units

    Energy Technology Data Exchange (ETDEWEB)

    1987-02-01

    This plan defines the actions needed to achieve detection-level monitoring compliance at the Hanford Site 200 Areas Low-Level Burial Grounds (LLBG) in accordance with the Resource Conservation and Recovery Act (RCRA). Compliance will be achieved through characterization of the hydrogeology and monitoring of the ground water beneath the LLBG located in the Hanford Site 200 Areas. 13 refs., 20 figs.

  2. Groundwater monitoring program plan and conceptual site model for the Al-Tuwaitha Nuclear Research Center in Iraq.

    Energy Technology Data Exchange (ETDEWEB)

    Copland, John Robin; Cochran, John Russell

    2013-07-01

    The Radiation Protection Center of the Iraqi Ministry of Environment is developing a groundwater monitoring program (GMP) for the Al-Tuwaitha Nuclear Research Center located near Baghdad, Iraq. The Al-Tuwaitha Nuclear Research Center was established in about 1960 and is currently being cleaned-up and decommissioned by Iraqs Ministry of Science and Technology. This Groundwater Monitoring Program Plan (GMPP) and Conceptual Site Model (CSM) support the Radiation Protection Center by providing: A CSM describing the hydrogeologic regime and contaminant issues, recommendations for future groundwater characterization activities, and descriptions of the organizational elements of a groundwater monitoring program. The Conceptual Site Model identifies a number of potential sources of groundwater contamination at Al-Tuwaitha. The model also identifies two water-bearing zones (a shallow groundwater zone and a regional aquifer). The depth to the shallow groundwater zone varies from approximately 7 to 10 meters (m) across the facility. The shallow groundwater zone is composed of a layer of silty sand and fine sand that does not extend laterally across the entire facility. An approximately 4-m thick layer of clay underlies the shallow groundwater zone. The depth to the regional aquifer varies from approximately 14 to 17 m across the facility. The regional aquifer is composed of interfingering layers of silty sand, fine-grained sand, and medium-grained sand. Based on the limited analyses described in this report, there is no severe contamination of the groundwater at Al-Tuwaitha with radioactive constituents. However, significant data gaps exist and this plan recommends the installation of additional groundwater monitoring wells and conducting additional types of radiological and chemical analyses.

  3. Groundwater monitoring plan for the Hanford Site 216-B-3 pond RCRA facility

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D.B.; Chou, C.J.

    1998-06-01

    The 216-B-3 pond system was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In operation since 1945, the B Pond system has been a RCRA facility since 1986, with Resource Conservation and Recovery Act (RCRA) interim-status groundwater monitoring in place since 1988. In 1994, discharges were diverted from the main pond, where the greatest potential for contamination was thought to reside, to the 3C expansion pond. In 1997, all discharges to the pond system were discontinued. In 1990, the B Pond system was elevated from detection groundwater monitoring to an assessment-level status because total organic halogens and total organic carbon were found to exceed critical means in two wells. Subsequent groundwater quality assessment failed to find any specific hazardous waste contaminant that could have accounted for the exceedances, which were largely isolated in occurrence. Thus, it was recommended that the facility be returned to detection-level monitoring.

  4. Addendum to the 1996 Gunnison Monitoring Report for the Gunnison, Colorado Wetlands Mitigation Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is an addendum to the 1996 Gunnison Monitoring Report for the Gunnison, Colorado, Wetlands Mitigation Report, dated July 1997. The purpose of this addendum is to: (1) modify how information on plant height and plant species criteria are presented; and (2) provide more detailed information regarding the evaluation of the bare ground criteria at the Camp Ketle site. The information in this addendum is provided at the request of the Bureau of Land Management to aid in future monitoring and evaluation of the wetland mitigation sites.

  5. DECATASTROPHIZE - Use of SDSS and MCDA to prepare for disasters or plan for multiple hazards

    Science.gov (United States)

    Damalas, Andreas; Mettas, Christodoulos; Evagorou, Evagoras; Hadjimitsis, Diofantos

    2017-04-01

    This project presents effective early warning and alert systems in order to ensure lives and protect citizens, property and the environment in regards to natural and also man-made disasters. Civil protection can be rewarded from developed analysis tools in order to manage the resources available at all levels within the organization. The utilization of Geo-Spatial Early-warning Decision Support Systems (GE-DSS) combined with integrated Geographic Information System (GIS) solutions and multi-criteria decision analysis (MCDA) fuses text and geographic information into one view. DECAT' s purpose is the use of GE-DSS for rapid preparation ability and sustainability to assess and respond to multiple natural, man-made hazards disasters and environmental circumstances. This will be achieved by using existing models / systems in the direction of one multiplatform, which is distributed and integrated framework known as DECAT. The project is expected to create better prerequisites for, and improve preparedness, as well as enhance awareness of, civil protection, natural hazard and marine pollution professionals and volunteers. It intends to support and equilibrate the efforts of the participating states for the protection of citizens, environment and property in regards to natural and man-made disaster. Moreover, the respective project is pointing out the importance exchanging information and experience in meanings of improving the operations of all parties involved in civil protection (private and public professionals and volunteers). DECATASTROPHIZE targets for the support of the EU coordinate countries and potentials who do not participate in the ''Mechanisms and European Neighborhood Policy'' countries in the view of disaster Preparedness. Enhancing their cooperation their cooperation within the union Civil Protection Mechanism is also of high importance.

  6. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient...

  7. Leveraging Educational, Research and Facility Expertise to Improve Global Seismic Monitoring: Preparing a Guide on Sustainable Networks

    Science.gov (United States)

    Nybade, A.; Aster, R.; Beck, S.; Ekstrom, G.; Fischer, K.; Lerner-Lam, A.; Meltzer, A.; Sandvol, E.; Willemann, R. J.

    2008-12-01

    Building a sustainable earthquake monitoring system requires well-informed cooperation between commercial companies that manufacture components or deliver complete systems and the government or other agencies that will be responsible for operating them. Many nations or regions with significant earthquake hazard lack the financial, technical, and human resources to establish and sustain permanent observatory networks required to return the data needed for hazard mitigation. Government agencies may not be well- informed about the short-term and long-term challenges of managing technologically advanced monitoring systems, much less the details of how they are built and operated. On the relatively compressed time scale of disaster recovery efforts, it can be difficult to find a reliable, disinterested source of information, without which government agencies may be dependent on partial information. If system delivery fails to include sufficient development of indigenous expertise, the performance of local and regional networks may decline quickly, and even data collected during an early high-performance period may be degraded or lost. Drawing on unsurpassed educational capabilities of its members working in close cooperation with its facility staff, IRIS is well prepared to contribute to sustainability through a wide variety of training and service activities that further promote standards for network installation, data exchange protocols, and free and open access to data. Members of the Consortium and staff of its Core Programs together could write a guide on decisions about network design, installation and operation. The intended primary audience would be government officials seeking to understand system requirements, the acquisition and installation process, and the expertise needed operate a system. The guide would cover network design, procurement, set-up, data use and archiving. Chapters could include advice on network data processing, archiving data (including

  8. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    S. E. Rawlinson

    2001-09-01

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

  9. Chapter 10. Developing a habitat monitoring program: three examples from national forest planning

    Science.gov (United States)

    Michael I. Goldstein; Lowell H. Suring; Christina D. Vojta; Mary M. Rowland; Clinton. McCarthy

    2013-01-01

    This chapter reviews the process steps of wildlife habitat monitoring described in chapters 2 through 9 and provides three case examples that illustrate how the process steps apply to specific situations. It provides the reader an opportunity to synthesize the material while also revealing the potential knowledge gaps and pitfalls that may complicate completion of a...

  10. Ambient air monitoring plan for Ciudad Acuna and Piedra Negras, Coahuila, Mexico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Winberry, J.; Henning, L.; Crume, R.

    1998-01-01

    The Cities of Ciudad Acuna and Piedras Negras and the State of Coahuila in Mexico are interested in improving ambient air quality monitoring capabilities in the two cities through the establishment of a network of ambient air monitors. The purpose of the network is to characterize population exposure to potentially harmful air contaminants, possibly including sulfur dioxide (SO{sub 2}), nitrogen oxides (NO{sub x}), ozone (O{sub 3}), carbon monoxide (CO), total suspended particulate matter (TSP), particulate matter with aerodynamic diameter less than 100 micrometers PM-10, and lead. This report presents the results of an evaluation of existing air quality monitoring equipment and facilities in Ciudad Acuna and Piedras Negras. Additionally, the report presents recommendations for developing an air quality monitoring network for PM-10, SO{sub 2}, lead, and ozone in these cities, using a combination of both new and existing equipment. The human resources currently available and ultimately needed to operate and maintain the network are also discussed.

  11. "Work in progress" : the hidden dimensions of monitoring and planning in Pakistan

    NARCIS (Netherlands)

    Kolkma, W.A.M.

    1998-01-01

    The study argues that monitoring systems for large numbers of projects constituting public sector development programmes such as found in Pakistan, are built on the positivist premise that progress can be summarised objectively and in a few concise statements or indicators. Theory and

  12. "Work in progress" : the hidden dimensions of monitoring and planning in Pakistan

    NARCIS (Netherlands)

    Kolkma, W.A.M.

    1998-01-01

    The study argues that monitoring systems for large numbers of projects constituting public sector development programmes such as found in Pakistan, are built on the positivist premise that progress can be summarised objectively and in a few concise statements or indicators. Theory and handb

  13. Monitoring Staff Performance: A Plan for Quality Control in Project Follow Through.

    Science.gov (United States)

    Jackson, Donald A.; Bushell, Don, Jr.

    This report describes a staff training and performance monitoring system for elementary school teachers, teacher aides, and parent aides participating in the Behavior Analysis Follow Through (B.A.) compensatory education program. The B.A. model involves the use of additional staff, individualized instruction, programmed curriculum materials, and a…

  14. Wordt het veiliger in de dode hoek? : een plan voor monitoring van de dodehoekproblematiek.

    NARCIS (Netherlands)

    Schoon, C.C.

    2012-01-01

    Is the blind spot getting safer? : a proposal for monitoring the blind spot issue. Blind spot crashes are crashes in which a truck that turns off to the right crashes into a vulnerable road user who goes straight on. The casualties are often cyclists. In the period 2007-2010, blind spot crashes invo

  15. Wordt het veiliger in de dode hoek? : een plan voor monitoring van de dodehoekproblematiek.

    NARCIS (Netherlands)

    Schoon, C.C.

    2012-01-01

    Is the blind spot getting safer? : a proposal for monitoring the blind spot issue. Blind spot crashes are crashes in which a truck that turns off to the right crashes into a vulnerable road user who goes straight on. The casualties are often cyclists. In the period 2007-2010, blind spot crashes invo

  16. Work in progress: the hidden dimensions of monitoring and planning in Pakistan.

    NARCIS (Netherlands)

    Kolkma, W.A.M.

    1998-01-01

    The study argues that monitoring systems for large numbers of projects constituting public sector development programmes such as found in Pakistan, are built on the positivist premise that progress can be summarised objectively and in a few concise statements or indicators. Theory and handbooks on t

  17. Improving health aid for a better planet: The planning, monitoring and evaluation tool (PLANET

    Directory of Open Access Journals (Sweden)

    Devi Sridhar

    2015-12-01

    Full Text Available Background International development assistance for health (DAH quadrupled between 1990 and 2012, from US$ 5.6 billion to US$ 28.1 billion. This generates an increasing need for transparent and replicable tools that could be used to set investment priorities, monitor the distribution of funding in real time, and evaluate the impact of those investments.

  18. Formulation and preparation on Hanford Waste Treatment Plan direct feed low activity waste effluent management facility core simulant

    Energy Technology Data Exchange (ETDEWEB)

    McCabe, Daniel J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Nash, Charles A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL; Adamson, Duane J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL

    2016-05-01

    The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Melter Off-Gas Condensate, LMOGC) from the off-gas system. The baseline plan for disposition of this stream during full WTP operations is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility. However, during the Direct Feed LAW (DFLAW) scenario, planned disposition of this stream is to evaporate it in a new evaporator in the Effluent Management Facility (EMF) and then return it to the LAW melter. It is important to understand the composition of the effluents from the melter and new evaporator so that the disposition of these streams can be accurately planned and accommodated. Furthermore, alternate disposition of the LMOGC stream would eliminate recycling of problematic components, and would enable less integrated operation of the LAW melter and the Pretreatment Facilities. Alternate disposition would also eliminate this stream from recycling within WTP when it begins operations and would decrease the LAW vitrification mission duration and quantity of glass waste, amongst the other problems such a recycle stream present. This LAW Melter Off-Gas Condensate stream will contain components that are volatile at melter temperatures and are problematic for the glass waste form, such as halides and sulfate. Because this stream will recycle within WTP, these components accumulate in the Melter Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Diverting the stream reduces the halides and sulfate in the recycled Condensate and is a key outcome of this work. This overall program examines the potential treatment and immobilization of this stream to enable alternative disposal. The objective of this task was to formulate and prepare a simulant of the LAW Melter

  19. Monitoring implementation of desertification combating plan using geomatics – A case study, districts Dhar and Jhabua, Madhya Pradesh

    Indian Academy of Sciences (India)

    Dasgupta Arunima; P S Dhinwa; A S Rajawat

    2015-02-01

    The world’s drylands are subject to desertification as a result of extended droughts, climate change, and human activities. Development in drylands depends on addressing degradation of the ecosystem, main-streaming sustainable natural resources management, and building upon the existing adaptive capacities of communities and institutions. In this regard, recent scientific results aimed to promote sustainable development through action plans for combating desertification. In India, under the Integrated Mission for Sustainable Development (IMSD) programme, remote sensing based integrated land and water resource studies were carried out with an objective to generate locale specific action plans for sustainable development of a region. A specific study was carried out, in districts of Jhabua and Dhar, in Madhya Pradesh using Composite Land Development Sites (CLDS) approach for forest and wasteland development and soil and water conservation. Various treatments were suggested and implemented in 1995. The present study was carried out with an objective to monitor the positive impacts of combating plan implementation through visual interpretation and NDVI analysis of temporal images of LISS III data, since 1991 to 2013. The study reveals that there is substantial increase in the area of irrigated agricultural land with increase in number of check dams along with the stream channels.

  20. Determination of monitor unit check tolerances based on a comparison with measurement and treatment planning system data

    Energy Technology Data Exchange (ETDEWEB)

    Curtis, Helen [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom); Richmond, Neil, E-mail: neil.richmond@stees.nhs.uk [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom); Burke, Kevin; Walker, Chris [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom)

    2013-04-01

    ABSTRACT: This work describes the experimental validation of treatment planning system monitor unit (MU) calculations against measurement for a range of scenarios. This, together with a comparison of treatment planning system MUs and an independent MU check method, allows the derivation of confidence intervals for the check process. Data were collected for open and 60° motorized wedge fields using an Elekta Synergy linac at 6 and 8 MV using homogeneous and heterogeneous phantoms. Masterplan (Version 4.0) pencil-beam and collapsed cone algorithms were used for the primary MU calculations with full inhomogeneity correction. Results show that both algorithms agree with measurement to acceptable tolerance levels in the majority of the cases studied. The confidence interval for the pencil-beam algorithm MU against an independent check was determined as + 1.6% to −3.4%. This is modified to + 2.3% to −2.5% when data collected with low-density heterogeneities are removed as this algorithm is not used clinically for these cases. The corresponding interval for the collapsed cone algorithm was + 1.2% to −4.3%, indicating that an offset tolerance for the independent check is appropriate. Analysis of clinical conformal treatment plan data generated using the pencil-beam algorithm (1393 beams) returned 93% of beams within the independent check tolerance. Similarly, using the collapsed cone algorithm as the primary MU calculation, 77% (of 1434 beams) were within the confidence interval.

  1. Determination of monitor unit check tolerances based on a comparison with measurement and treatment planning system data.

    Science.gov (United States)

    Curtis, Helen; Richmond, Neil; Burke, Kevin; Walker, Chris

    2013-01-01

    This work describes the experimental validation of treatment planning system monitor unit (MU) calculations against measurement for a range of scenarios. This, together with a comparison of treatment planning system MUs and an independent MU check method, allows the derivation of confidence intervals for the check process. Data were collected for open and 60° motorized wedge fields using an Elekta Synergy linac at 6 and 8MV using homogeneous and heterogeneous phantoms. Masterplan (Version 4.0) pencil-beam and collapsed cone algorithms were used for the primary MU calculations with full inhomogeneity correction. Results show that both algorithms agree with measurement to acceptable tolerance levels in the majority of the cases studied. The confidence interval for the pencil-beam algorithm MU against an independent check was determined as + 1.6% to -3.4%. This is modified to + 2.3% to -2.5% when data collected with low-density heterogeneities are removed as this algorithm is not used clinically for these cases. The corresponding interval for the collapsed cone algorithm was + 1.2% to -4.3%, indicating that an offset tolerance for the independent check is appropriate. Analysis of clinical conformal treatment plan data generated using the pencil-beam algorithm (1393 beams) returned 93% of beams within the independent check tolerance. Similarly, using the collapsed cone algorithm as the primary MU calculation, 77% (of 1434 beams) were within the confidence interval.

  2. Field Evaluations Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel

    Science.gov (United States)

    Lewis, Pattie

    2005-01-01

    and approve alternative surface preparation technologies for use at NASA and AFSPC installations. Materials and processes will be evaluated with the goal of selecting those processes that will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination and reduce the amount of hazardous waste generated. This Field Evaluations Test Plan defines the field evaluation and testing requirements for validating alternative surface preparation/depainting technologies and supplements the JTP. The field evaluations will be performed at Stennis Space Center, Mississippi, under the oversight of the Project Engineer. Additional field evaluations may be performed at other NASA centers or AFSPC facilities.

  3. 76 FR 31359 - Notice of Intent To Prepare an Environmental Impact Statement on a General Management Plan...

    Science.gov (United States)

    2011-05-31

    ... plan. A range of reasonable alternatives for managing the park will be developed through this planning... management goals for managing the area during the next 15 to 20 years. The plan will prescribe desired...

  4. Woking Park PAFC CHP monitoring. Phase 1: Planning, installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Goulding, P.S.; Fry, M.R.

    2003-07-01

    This report covers the planning, installation and commissioning of the first commercially operated fuel cell cogeneration system in the UK. The involvement of Woking Borough Council, its approach to energy efficiency, and the Woking Park site are discussed, and details are given of the PC25/C 200kW fuel cell which is manufactured in the US by UTC Fuel Cells. A description of the Woking Park fuel cell combined heat and power application is presented, and the project economics, specification and tendering are examined. The route taken to planning approval is traced, and installation procedures are outlined. The testing of the phosphoric type PC25 fuel cell cogeneration unit is described, and expected cost and project timescales are noted.

  5. Maintaining professional confidence--monitoring work with obese schoolchildren with support of an action plan.

    Science.gov (United States)

    Müllersdorf, Maria; Zuccato, Linda Martinson; Nimborg, Jennie; Eriksson, Henrik

    2010-03-01

    School nurses meet obese children in their everyday work. Although school nurses acknowledge the importance of getting hold of school children's obesity, they seem to lack strategies enabling them to handle the delicacy of the problem. The aim of this study was to describe how school nurses perceive their work with obese children with support of an action plan. Qualitative in-depth interviews were performed with six school nurses working in a municipality, where an action plan for the work with obese school-age children had been implemented. The transcribed data was analysed by a manifest content analysis. The results showed that the informants perceived having a key role in the obesity work, which they experienced as meaningful, but full of pitfalls. They found themselves suitable for the task, but perceived lacking deeper knowledge about specific modes of work such as motivational conversation. As the task was considered delicate, there were great demands for guidelines, education and cooperation. The action plan served as support for maintaining professional confidence throughout the process, but there was room for improvements.

  6. Automatic data processing and analysis system for monitoring region around a planned nuclear power plant

    Science.gov (United States)

    Kortström, Jari; Tiira, Timo; Kaisko, Outi

    2016-03-01

    The Institute of Seismology of University of Helsinki is building a new local seismic network, called OBF network, around planned nuclear power plant in Northern Ostrobothnia, Finland. The network will consist of nine new stations and one existing station. The network should be dense enough to provide azimuthal coverage better than 180° and automatic detection capability down to ML -0.1 within a radius of 25 km from the site.The network construction work began in 2012 and the first four stations started operation at the end of May 2013. We applied an automatic seismic signal detection and event location system to a network of 13 stations consisting of the four new stations and the nearest stations of Finnish and Swedish national seismic networks. Between the end of May and December 2013 the network detected 214 events inside the predefined area of 50 km radius surrounding the planned nuclear power plant site. Of those detections, 120 were identified as spurious events. A total of 74 events were associated with known quarries and mining areas. The average location error, calculated as a difference between the announced location from environment authorities and companies and the automatic location, was 2.9 km. During the same time period eight earthquakes between magnitude range 0.1-1.0 occurred within the area. Of these seven could be automatically detected. The results from the phase 1 stations of the OBF network indicates that the planned network can achieve its goals.

  7. Groundwater Monitoring and Tritium-Tracking Plan for the 200 Area State-Approved Land Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. Brent

    2000-08-31

    The 200 Area State-Approved Land Disposal Site (SALDS) is a drainfield which receives treated wastewater, occasionally containing high levels of tritium from treatment of Hanford Site liquid wastes. Only the SALDS proximal wells (699-48-77A, 699-48-77C, and 699-48-77D) have been affected by tritium from the facility thus far; the highest activity observed (2.1E+6 pCi/L) occurred in well 699-48-77D in February 1998. Analytical results of groundwater geochemistry since groundwater monitoring began at the SALDS indicate that all constituents with permit enforcement limits have been below those limits with the exception of one measurement of total dissolved solids (TDS) in 1996. The revised groundwater monitoring sampling and analysis plan eliminates chloroform, acetone, tetrahydrofuran, benzene, and ammonia as constituents. Replicate field measurements will replace laboratory measurements of pH for compliance purposes. A deep companion well to well 699-51-75 will be monitored for tritium deeper in the uppermost aquifer.

  8. Preparation for Snow Cover Monitoring Using Sentinel-1 and Sentinel-3 Data

    Science.gov (United States)

    Nagler, Thomas; Rott, Helmut; Bippus, Gabriele; Ripper, Elisabeth

    2013-04-01

    Seasonal snow is a key element of the water cycle in high and mid latitudes, characterized by high spatial and temporal variability. Melt water is an important water resource in many mountain areas and also in lowlands downstream. Accurate observations of snow extent and physical properties of snow are not only of interest for climate change research, but are of great socio-economic importance. The Sentinel satellite series, including SAR and multispectral optical satellite data enable to monitor the snow extent from regional to global scale with high temporal sampling. Automatic processing lines of multispectral optical satellite data including rectification, calibration, cloud masking and snow detection have been implemented for generation of snow information and tested with various satellite sensors. Ongoing work is related with adapting and optimizing the snow retrieval algorithm for Sentinel 3 SLSTR and OCLI, making use of the full spectral capabilities of these sensors for generating high quality snow maps. The algorithm for mapping snow makes use of the typical spectral signature of snow in the visible (VIS) and short wave infrared (SWIR) region of the spectrum, which enables a clear discrimination against other surfaces. The baseline products include binary snow extent maps derived from combinations of VIS and SWIR bands and maps of fractional snow extent. The preliminary version of the retrieval algorithm uses dual-sensor Sentinel-3 SLSTR and OCLI data for mapping the snow extent and applies the multi-spectral un-mixing method and cloud screening making use of the various spectral channels of the two sensors. Snow conditions (wet/dry) can be retrieved from SAR observations as provided by Sentinel-1. The algorithm builds on the multi-temporal change detection technique for mapping melting snow areas and improved to make use of the dual-polarisation acquisition capabilities of Sentinel-1. In the presentation we will show first examples of the improved

  9. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    BUSSELL, J.H.

    1999-08-25

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.

  10. Groundwater monitoring plan for the Hanford Site 200 Area Treated Effluent Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    DB Barnett

    2000-05-17

    Seven years of groundwater monitoring at the 200 Area Treated Effluent Disposal Facility (TEDF) have shown that the uppermost aquifer beneath the facility is unaffected by TEDF effluent. Effluent discharges have been well below permitted and expected volumes. Groundwater mounding from TEDF operations predicted by various models has not been observed, and waterlevels in TEDF wells have continued declining with the dissipation of the nearby B Pond System groundwater mound. Analytical results for constituents with enforcement limits indicate that concentrations of all these are below Practical Quantitation Limits, and some have produced no detections. Likewise, other constituents on the permit-required list have produced results that are mostly below sitewide background. Comprehensive geochemical analyses of groundwater from TEDF wells has shown that most constituents are below background levels as calculated by two Hanford Site-wide studies. Additionally, major ion proportions and anomalously low tritium activities suggest that groundwater in the aquifer beneath the TEDF has been sequestered from influences of adjoining portions of the aquifer and any discharge activities. This inference is supported by recent hydrogeologic investigations which indicate an extremely slow rate of groundwater movement beneath the TEDF. Detailed evaluation of TEDF-area hydrogeology and groundwater geochemistry indicate that additional points of compliance for groundwater monitoring would be ineffective for this facility, and would produce ambiguous results. Therefore, the current groundwater monitoring well network is retained for continued monitoring. A quarterly frequency of sampling and analysis is continued for all three TEDF wells. The constituents list is refined to include only those parameters key to discerning subtle changes in groundwater chemistry, those useful in detecting general groundwater quality changes from upgradient sources, or those retained for comparison with end

  11. Implementation of PLUTO Buoy for Monitoring Water Quality in Indonesia, Reflection and Future Plans

    Science.gov (United States)

    Chandra, H.; Krismono, K.; Kusumaningrum, P. D.; Sianturi, D.; Firdaus, Y.; Taukhid, I.; Borneo, B. B.

    2016-02-01

    Research and development of PLUTO (Perairan Selalu Termonitor/Waters Always Monitored) buoy has reached its fourth year in 2015. Try out has been done in coastal waters, fishponds, fishing port ponds, and reservoirs. In the first year (2010) try out has been performed on coastal waters with off line measurement system. The buoy used temperature, salinity, DO and pH sensors. In the second year (2013) try out was carried out on fishponds and fishing port ponds using telemetry measurement system. In the third year (2014) try out was carried out on water reservoir with telemetry measurement system. In the fourth year (2015) android application is developed to monitor 4 water reservoirs and 1 lake. Beside that, observation point is added to 3 point depth for one buoy. Parameters used are temperature, DO, and turbidity. Three PLUTO buoys are placed in each reservoir, at inlet, outlet, and at center of fish cultivation. Through Ocean Science Meeting in New Orleans it is hoped that there will be input and suggestion from the experts for future development of the monitoring system for public inland waters (especially reservoir and lake) in Indonesia. Keywords: buoy PLUTO, salinity, temperature, Dissolved Oxygen (DO), pH, turbidity, telemetry

  12. Developing monitoring plans to detect spills related to natural gas production.

    Science.gov (United States)

    Harris, Aubrey E; Hopkinson, Leslie; Soeder, Daniel J

    2016-11-01

    Surface water is at risk from Marcellus Shale operations because of chemical storage on drill pads during hydraulic fracturing operations, and the return of water high in total dissolved solids (up to 345 g/L) from shale gas production. This research evaluated how two commercial, off-the-shelf water quality sensors responded to simulated surface water pollution events associated with Marcellus Shale development. First, peak concentrations of contaminants from typical spill events in monitored watersheds were estimated using regression techniques. Laboratory measurements were then conducted to determine how standard in-stream instrumentation that monitor conductivity, pH, temperature, and dissolved oxygen responded to three potential spill materials: ethylene glycol (corrosion inhibitor), drilling mud, and produced water. Solutions ranging from 0 to 50 ppm of each spill material were assessed. Over this range, the specific conductivity increased on average by 19.9, 27.9, and 70 μS/cm for drilling mud, ethylene glycol, and produced water, respectively. On average, minor changes in pH (0.5-0.8) and dissolved oxygen (0.13-0.23 ppm) were observed. While continuous monitoring may be part of the strategy for detecting spills to surface water, these minor impacts to water quality highlight the difficulty in detecting spill events. When practical, sensors should be placed at the mouths of small watersheds where drilling activities or spill risks are present, as contaminant travel distance strongly affects concentrations in surface water systems.

  13. Improved monitoring framework for local planning in the water, sanitation and hygiene sector: From data to decision-making.

    Science.gov (United States)

    Garriga, Ricard Giné; de Palencia, Alejandro Jiménez Fdez; Foguet, Agustí Pérez

    2015-09-01

    Today, a vast proportion of people still lack a simple pit latrine and a source of safe drinking water. To help end this appalling state of affairs, there is a pressing need to provide policymakers with evidences which may be the basis of effective planning, targeting and prioritization. Two major challenges often hinder this process: i) lack of reliable data to identify which areas are most in need; and ii) inadequate instruments for decision-making support. In tackling previous shortcomings, this paper proposes a monitoring framework to compile, analyze, interpret and disseminate water, sanitation and hygiene information. In an era of decentralization, where decision-making moves to local governments, we apply such framework at the local level. The ultimate goal is to develop appropriate tools for decentralized planning support. To this end, the study first implements a methodology for primary data collection, which combines the household and the waterpoint as information sources. In doing so, we provide a complete picture of the context in which domestic WASH services are delivered. Second, the collected data are analyzed to underline the emerging development challenges. The use of simple planning indicators serves as the basis to i) reveal which areas require policy attention, and to ii) identify the neediest. Third, a classification process is proposed to prioritize among various populations. Three different case studies from East and Southern African countries are presented. Results indicate that accurate and comprehensive data, if adequately exploited through simple instruments, may be the basis of effective targeting and prioritization, which are central to sector planning. The application of the proposed framework in the real world, however, is to a certain extent elusive; and we point out to conclude two specific challenges that remain unaddressed, namely the upgrade of existing decision-making processes to enhance transparency and inclusiveness, and the

  14. TWRS privatization: Phase I monitoring well engineering study and decommissioning plan

    Energy Technology Data Exchange (ETDEWEB)

    Williams, B.A.

    1996-09-11

    This engineering study evaluates all well owners and users, the status or intended use of each well, regulatory programs, and any future well needs or special purpose use for wells within the TWRS Privatization Phase I demonstration area. Based on the evaluation, the study recommends retaining 11 of the 21 total wells within the demonstration area and decommissioning four wells prior to construction activities per the Well Decommissioning Plan (WHC-SD-EN-AP-161, Rev. 0, Appendix I). Six wells were previously decommissioned.

  15. Tank monitor and control system (TMACS) year 2000 compliance project plan

    Energy Technology Data Exchange (ETDEWEB)

    HOLM, M.J.

    1999-06-24

    The purpose of this document is to describe tests performed to validate Revision 11 of the Tank Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  16. Application of a new laser Doppler imaging system in planning and monitoring of surgical flaps

    Science.gov (United States)

    Schlosser, Stefan; Wirth, Raphael; Plock, Jan A.; Serov, Alexandre; Banic, Andrej; Erni, Dominique

    2010-05-01

    There is a demand for technologies able to assess the perfusion of surgical flaps quantitatively and reliably to avoid ischemic complications. The aim of this study is to test a new high-speed high-definition laser Doppler imaging (LDI) system (FluxEXPLORER, Microvascular Imaging, Lausanne, Switzerland) in terms of preoperative mapping of the vascular supply (perforator vessels) and postoperative flow monitoring. The FluxEXPLORER performs perfusion mapping of an area 9×9 cm with a resolution of 256×256 pixels within 6 s in high-definition imaging mode. The sensitivity and predictability to localize perforators is expressed by the coincidence of preoperatively assessed LDI high flow spots with intraoperatively verified perforators in nine patients. 18 free flaps are monitored before, during, and after total ischemia. 63% of all verified perforators correspond to a high flow spot, and 38% of all high flow spots correspond to a verified perforator (positive predictive value). All perfused flaps reveal a value of above 221 perfusion units (PUs), and all values obtained in the ischemic flaps are beneath 187 PU. In summary, we conclude that the present LDI system can serve as a reliable, fast, and easy-to-handle tool to detect ischemia in free flaps, whereas perforator vessels cannot be detected appropriately.

  17. The data quality monitoring challenge at CMS experience from first collisions and future plans

    CERN Document Server

    De Guio, Federico

    2015-01-01

    The Data Quality Monitoring (DQM) Software is a central tool in the CMS experiment. Its robustness and flexibility is critical for monitoring detector performance and providing fast and comprehensive feedback centrally for the experiment in real-time (Online DQM), after a full event processing with fine-grained analysis (Offline DQM), and as a validation tool to validate both the CMS software (CMSSW), calibration and alignment scenarios and extensive simulations. The entire DQM framework has undergone fundamental changes, and the first performance results of this newly updated system will be presented in the context of the first proton-proton collisions for CERNs Large Hadron Collider at a center of mass energy of 13 TeV. These results will encapsulate the performance of the CMS detector in the context of the upgraded DQM system that makes available more sophisticated methods for evaluating data quality, as well as a dedicated review of the technical challenges and improvements specific to the DQM framework i...

  18. Groundwater quality sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of energy and managed by martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  19. Groundwater Quality Sampling and Analysis Plan for Environmental Monitoring Waste Area Grouping 6 at Oak Ridge National Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  20. The National Water-Quality Assessment (NAWQA) Program planned monitoring and modeling activities for Texas, 2013–23

    Science.gov (United States)

    Ging, Patricia

    2013-01-01

    The U.S. Geological Survey’s (USGS) National Water-Quality Assessment (NAWQA) Program was established by Congress in 1992 to answer the following question: What is the status of the Nation’s water quality and is it getting better or worse? Since 1992, NAWQA has been a primary source of nationally consistent data and information on the quality of the Nation’s streams and groundwater. Data and information obtained from objective and nationally consistent water-quality monitoring and modeling activities provide answers to where, when, and why the Nation’s water quality is degraded and what can be done to improve and protect it for human and ecosystem needs. For NAWQA’s third decade (2013–23), a new strategic Science Plan has been developed that describes a strategy for building upon and enhancing the USGS’s ongoing assessment of the Nation’s freshwater quality and aquatic ecosystems.

  1. ADVANCED MR IMAGING METHODS FOR PLANNING AND MONITORING RADIATION THERAPY IN PATIENTS WITH HIGH GRADE GLIOMA

    Science.gov (United States)

    Lupo, Janine M.; Nelson, Sarah J.

    2016-01-01

    This review explores how the integration of advanced imaging methods with high quality anatomic images significantly improves the characterization, target definition, assessment of response to therapy, and overall management of patients with high-grade glioma. Metrics derived from diffusion, perfusion, and susceptibility weighted MR imaging in conjunction with MR spectroscopic imaging, allows us to characterize regions of edema, hypoxia, increased cellularity, and necrosis within heterogeneous tumor and surrounding brain tissue. Quantification of such measures may provide a more reliable initial representation of tumor delineation and response to therapy than changes in the contrast enhancing or T2 lesion alone and have a significant impact on targeting resection, planning radiation, and assessing treatment effectiveness. In the long-term, implementation of these imaging methodologies can also aid in the identification of recurrent tumor and its differentiation from treatment-related confounds and facilitate the detection of radiation-induced vascular injury in otherwise normal appearing brain tissue. PMID:25219809

  2. Long-term monitoring of UK river basins: the disconnections between the timescales of hydrological processes and watershed management planning

    Science.gov (United States)

    Howden, N. J. K.; Burt, T.; Worrall, F.

    2016-12-01

    The UK has a wealth of hydrological monitoring data that has both good coverage in space since the early 1970s, and also a few locations where records have been kept continuously for almost 150 years. Such datasets offer unique opportunities for the hydrologist to consider how the concepts of stationarity, change, and definitions of "baseline" resources should be used to shape how we build models of these systems, and how we devise appropriate and sustainable watershed management strategies. In this paper we consider some of the UK's longest hydrological and biogeochemical records, to explore how long records can be used to shape such understanding and, in some cases, how they can be used to identify new modes of behaviour that need to be incorporated into management planning, from the scale of individual watersheds right up to the national scale. We also consider how key timescales of hydrological responses that are evident within the data may pose major problems for watershed management unless appropriate attention is paid to the potential impacts of processes that work over decadal timescales - much longer than sub-decadal water industry investment cycles or short-term projects for watershed management planning. We use our long-term records to show how key processes can be identified, and to illustrate how careful interpretation of shorter term records will improve decision-making for water resource management.

  3. OpenGIS System to Monitor the Impact of Spatial Planning Policies

    Directory of Open Access Journals (Sweden)

    ANTONIO TACHE

    2008-01-01

    Full Text Available Based on the studies of European experience in spatial planning (policies, strategies, indicators, the project aims to create two databases for Romania, one at region level and one at the level of the administrative-territorial unit, in OpenGIS system using adequate indicators allowing for the identification and measurement of socio-economic development trends in a spatial context. To achieve this, competent studies will look at the differences between the European territorial indicators (EUROSTAT, ESPON and the national ones, level NUTS II, or NUTS V. Following the identification of the two sets of territorial indicators, the structure of alphanumeric databases will be conceived in GIS. Concomitantly with the NUTS V digital map of Romania, alphanumeric databases will be fed with statistical data according to proposed territorial indicators schemes. Proposed model will be tested on territorial analyses by groups of indicators. The novelty consists in the spatial planning approach based on the conjunction between GIS and mathematical methods of evaluation and prognosis, the transposition of the mathematical method in a TurboC++ program, and the integration in the proposed system. Based on the results, NUTS II and NUTS V territorial indicators will be classified in groups, in charts and maps underlining socio-economic development disparities at national level. The GISTEREG project is conceived to be integrated into the OpenGIS database proposed by ESPON, aiming at a fast quantification of European regional policies. This is why the structure of the database will be conceived in accordance with EUROSTAT, level NUTS V, and ESPON and the Regional Operational Program – Priority Axis VI, level NUTS II. The proposed GISTEREG model, due to the mathematical component integrated into the system will be able to diagnose the main existing challenges and forecast the development of regions and zones within Romania. Databases obtained and presented in Open

  4. The Northwest Geysers EGS Demonstration Project Phase 1: Pre-stimulation coupled geomechanical modeling to guide stimulation and monitoring plans

    Energy Technology Data Exchange (ETDEWEB)

    Rutqvist, J.; Dobson, P.F.; Oldenburg, C.M.; Garcia, J.; Walters, M.

    2010-10-20

    This paper presents activities and results associated with Phase 1 (pre-stimulation phase) of an Enhanced Geothermal System (EGS) demonstration project at the northwest part of The Geysers geothermal field, California. The paper presents development of a 3-D geological model, coupled thermal-hydraulic-mechanical (THM) modeling of proposed stimulation injection as well as current plans for stimulation and monitoring of the site. The project aims at creating an EGS by directly and systematically injecting cool water at relatively low pressure into a known High Temperature (about 280 to 350 C) Zone (HTZ) located under the conventional (240 C) steam reservoir at depths of {approx}3 km. Accurate micro-earthquake monitoring initiated before the start of the injection will be used as a tool for tracking the development of the EGS and monitoring changes in microseismicity. We first analyzed historic injection and micro-earthquake data from an injection well (Aidlin 11) located about 3 miles to the west of the new EGS demonstration area. Thereafter, we used the same modeling approach to predict the likely extent of the zone of enhanced permeability for a proposed initial injection in two wells (Prati State 31 and Prati 32) at the new EGS demonstration area. Our modeling indicates that the proposed injection scheme will provide additional steam production in the area by creating a zone of permeability enhancement extending about 0.5 km from each injection well which will connect to the overlying conventional steam reservoir, in agreement with the conclusions of Nielson and Moore (2000).

  5. Escherichia coli O157 in foodstuffs: first year results of monitoring plan in Piedmont region, 2011

    Directory of Open Access Journals (Sweden)

    Antonio Barbaro

    2012-10-01

    Full Text Available A total of 260 food samples were examined for the presence of Shiga toxin-producing Escherichia coli O157 (STEC O157. Samples were collected between May 2011 and September 2011 in Piedmont region and included 120 minced meat and meat preparation (hamburger and meat balls and 180 soft and semi-soft cheeses made from raw milk with less than 60 days of ripening. Samples were collected at re-tail level. All samples were tested using an Enzyme Linked Fluorescent Assay (ELFA (AFNOR BIO 12/8 - 07/00, with kit VIDAS® ECO (bioMérieux; if positive, the samples have been tested with VIDAS® ICE and spread onto selective media to allow the growth of the strains. If present, all the strains have been tested to detect the genes encoding the pathogen factors (stx1, stx2 and eae. STEC O157 was not detected in any products. This survey on the presence of STEC O157 in foodstuffs provided data, demonstrating a low prevalence of the pathogen in our Region.

  6. Inspection and monitoring plan, contaminated groundwater seeps 317/319/ENE Area, Argonne National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-11

    During the course of completing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) in the 317/319/East-Northeast (ENE) Area of Argonne National Laboratory-East (ANL-E), groundwater was discovered moving to the surface through a series of groundwater seeps. The seeps are located in a ravine approximately 600 ft south of the ANL-E fence line in Waterfall Glen Forest Preserve. Samples of the seep water were collected and analyzed for selected parameters. Two of the five seeps sampled were found to contain detectable levels of organic contaminants. Three chemical species were identified: chloroform (14--25 {micro}g/L), carbon tetrachloride (56--340 {micro}g/L), and tetrachloroethylene (3--6 {micro}g/L). The other seeps did not contain detectable levels of volatile organics. The nature of the contaminants in the seeps will also be monitored on a regular basis. Samples of surface water flowing through the bottom of the ravine and groundwater emanating from the seeps will be collected and analyzed for chemical and radioactive constituents. The results of the routine sampling will be compared with the concentrations used in the risk assessment. If the concentrations exceed those used in the risk assessment, the risk calculations will be revised by using the higher numbers. This revised analysis will determine if additional actions are warranted.

  7. 75 FR 8739 - Notice of Intent To Prepare a Resource Management Plan for the Uncompahgre Field Office and...

    Science.gov (United States)

    2010-02-25

    ... issues and planning criteria may be submitted in writing until March 29, 2010 Scoping meetings were held...: You may submit comments on issues and planning criteria by any of the following methods: Web site...; announces the beginning of the scoping process; and seeks public input on issues and planning criteria. The...

  8. 78 FR 56730 - Notice of Intent To Amend the Resource Management Plan for the Gunnison Field Office and Prepare...

    Science.gov (United States)

    2013-09-13

    .... ADDRESSES: You may submit comments on issues and planning criteria related to Hartman Rocks Special... planning criteria. The planning area is located in Gunnison County, Colorado, and encompasses approximately... managing recreation in a manner that maintains or improves the condition and health of the unique landscape...

  9. 75 FR 4413 - Notice of Intent to Prepare an Environmental Impact Statement for a General Management Plan...

    Science.gov (United States)

    2010-01-27

    ... alternatives for managing the park will be developed through this planning process and will include, at a... managing the area during the next 15 to 20 years. The plan will prescribe desired resource conditions and... proposal for additional wilderness designation within the park. As the first phase of the planning process...

  10. Pre-operational environmental monitoring plan for the Device Assembly Facility at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    Ferate, F.D.

    1995-01-01

    Nuclear explosives operations have been and may continue to be an important component of the DOE mission at the NTS. This mission has been to conduct the nation`s nuclear testing program in a safe, secure, and efficient manner while assuring full compliance with state and federal regulations, and DOE order`s and directives. These operations have generally included assembly, disassembly or modification, staging, transportation, and tesbng of nuclear explosive devices. They may also include maintenance, repair, retrofit, and surveillance. The Device Assembly Facility (DAF) was constructed to provide a dedicated facility in which to prepare nuclear explosives assemblies for their intended disposition. This facility will provide for combined operations (replacing two separate facilities) and incorporates state-of-the-art safety and security features while minimizing the risks of environmental impacts. The facility has been completed but not yet operated, so the impacts to be considered will b e based on normal operations and not on the impacts of construction activities. The impacts will arise from nuclear explosives operations that require the handling of high explosives in combination with special nuclear materials. Wastes from operation of the earlier device assembly facilities have included grams of epoxies, pints of solvents, and small quantities of waste explosives. These are hazardous (includes radioactive) wastes and are disposed of in accordance with state and federal regulations. Assuming similar operations at the DAF, non-hazardous (includes non-radioactive) solid waste would be transported to a permitted landfill. Waste explosives would be sent to the Area 11 Explosive Ordnance Disposal Unit. Other hazardous waste would be sent to the Area 5 Radioactive Waste.Management Site for shipment or burial.

  11. Planning the improvement of seismic monitoring in a volcanic supersite: experience on Mt. Etna

    Science.gov (United States)

    D'Alessandro, Antonino; Scarfi, Luciano; Scaltrito, Antonio; Aiesi, Giampiero; Di Prima, Sergio; Ferrari, Ferruccio; Rapisarda, Salvatore

    2013-04-01

    Etna is one of the most active volcanoes in the world and one of the most intriguing natural laboratories for the understanding of eruptive processes and lava uprising in basalt-type volcanic environments; indeed, it is considered, by the scientific international community, together with the Vesuvius and the Hawaiian Islands, as a volcanic supersite. Its activity is continuously monitored by the Osservatorio Etneo of the Istituto Nazionale di Geofisica e Vulcanologia (INGV), by means of an array of integrated multidisciplinary techniques. In particular, Etna seismicity is recorded by a dense local seismic network (ESN- Etna Seismic Network), which, nowadays, consists of about 40 real-time seismic stations, many of which equipped with broadband velocity and accelerometer sensors. The data are analyzed routinely in detail by the Osservatorio Etneo staff, producing daily and periodic reports and bulletins of the earthquakes located in the whole Sicily and southern Calabria region. In the last decades, seismological observations provided important information on both the dynamics and internal structure of the volcano, in addition to their interaction with the regional tectonic structures. In the last year, in the framework of the VULCAMED project, an INGV workgroup has taken on the task of developing the existing seismic network through the installation of new measurement stations. By considering the spatial distribution of earthquakes in the area, the presence of structures known as seismically active and through extensive geological-geophysical surveys, ten potential new sites were identified. In the following months, some of these sites will complement the existing network. The choice of optimal sites must clearly be made through a careful analysis of environmental noise, of the possible logistics, technical and broadcast problems, but must also take into account the geometry of the existing seismic network. For this purpose, we applied the Seismic Network

  12. Monitoring of mercury, arsenic, and lead in traditional Asian herbal preparations on the Dutch market and estimation of associated risks

    NARCIS (Netherlands)

    Martena, M.J.; Wielen, van der J.C.A.; Rietjens, I.; Klerx, W.N.M.; Groot, de H.N.; Konings, E.J.M.

    2010-01-01

    Traditional herbal preparations used in Ayurveda, traditional Chinese medicine, traditional Tibetan medicine, and other Asian traditional medicine systems may contain significant amounts of mercury, arsenic or lead. Though deliberately incorporated in Asian traditional herbal preparations for therap

  13. Monitoring of mercury, arsenic, and lead in traditional Asian herbal preparations on the Dutch market and estimation of associated risks

    NARCIS (Netherlands)

    Martena, M.J.; Wielen, van der J.C.A.; Rietjens, I.; Klerx, W.N.M.; Groot, de H.N.; Konings, E.J.M.

    2010-01-01

    Traditional herbal preparations used in Ayurveda, traditional Chinese medicine, traditional Tibetan medicine, and other Asian traditional medicine systems may contain significant amounts of mercury, arsenic or lead. Though deliberately incorporated in Asian traditional herbal preparations for

  14. Developing a monitoring and evaluation framework to integrate and formalize the informal waste and recycling sector: the case of the Philippine National Framework Plan.

    Science.gov (United States)

    Serrona, Kevin Roy B; Yu, Jeongsoo; Aguinaldo, Emelita; Florece, Leonardo M

    2014-09-01

    The Philippines has been making inroads in solid waste management with the enactment and implementation of the Republic Act 9003 or the Ecological Waste Management Act of 2000. Said legislation has had tremendous influence in terms of how the national and local government units confront the challenges of waste management in urban and rural areas using the reduce, reuse, recycle and recovery framework or 4Rs. One of the sectors needing assistance is the informal waste sector whose aspiration is legal recognition of their rank and integration of their waste recovery activities in mainstream waste management. To realize this, the Philippine National Solid Waste Management Commission initiated the formulation of the National Framework Plan for the Informal Waste Sector, which stipulates approaches, strategies and methodologies to concretely involve the said sector in different spheres of local waste management, such as collection, recycling and disposal. What needs to be fleshed out is the monitoring and evaluation component in order to gauge qualitative and quantitative achievements vis-a-vis the Framework Plan. In the process of providing an enabling environment for the informal waste sector, progress has to be monitored and verified qualitatively and quantitatively and measured against activities, outputs, objectives and goals. Using the Framework Plan as the reference, this article developed monitoring and evaluation indicators using the logical framework approach in project management. The primary objective is to institutionalize monitoring and evaluation, not just in informal waste sector plans, but in any waste management initiatives to ensure that envisaged goals are achieved.

  15. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  16. Staged Radiosurgical Ablation for Choroid Melanoma: A Case Report with Emphasis on the Role of Patient Preparation, Treatment Planning, and Precision of Delivery.

    Science.gov (United States)

    Adamczyk, Marta; Janiga, Piotr

    2016-01-01

    The aim of reporting this case of choroid melanoma of the left eye is to introduce the in-house-designed treatment planning protocol for fractionated radiosurgical ablation of an intraocular lesion. This is a clinical case with emphasis on treatment preparation and delivery using the Accuray CyberKnife Robotic Radiosurgery System (Accuray, Sunnyvale, CA, USA) for a patient immobilized with a head mask and our in-house-made eye fixation system.

  17. 75 FR 77652 - Notice of Intent to Prepare a Resource Management Plan for the Battle Mountain District and...

    Science.gov (United States)

    2010-12-13

    ..., hydrology, public safety, law enforcement, fire ecology and management, rangeland ] management, sociology... possible with the plans and management programs of local government, consistent with State and Federal...

  18. 75 FR 22836 - Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan...

    Science.gov (United States)

    2010-04-30

    ... should be addressed in the plan. The BLM will work collaboratively with interested parties to identify..., Recreation, Visual Resource Management, Wilderness, Wild and Scenic Rivers, sociology, and economics....

  19. 76 FR 5199 - Notice of Intent To Prepare a Recreation Area Management Plan, a Comprehensive Transportation and...

    Science.gov (United States)

    2011-01-28

    ... management questions and concerns that should be addressed in the plan. The BLM will work collaboratively..., paleontology, botany, special status species, wildlife and fisheries, hydrology, sociology and...

  20. 78 FR 66064 - Notice of Intent To Prepare a Livestock Grazing Monument Management Plan Amendment and Associated...

    Science.gov (United States)

    2013-11-04

    ... questions and concerns that should be addressed in the plan. The BLM will work collaboratively with..., archaeology, paleontology, wildlife and fisheries, hydrology, soils, sociology and economics, and...

  1. 76 FR 34249 - Notice of Intent To Prepare a Resource Management Plan Amendment/Environmental Assessment for the...

    Science.gov (United States)

    2011-06-13

    ..., outdoor recreation, archaeology, paleontology, wildlife, lands and realty, hydrology, soils, sociology... existing planning documents; 7. The BLM staff will work cooperatively and collaboratively with...

  2. 76 FR 41819 - Notice of Intent To Prepare a Resource Management Plan Amendment for the Glade Run Recreation...

    Science.gov (United States)

    2011-07-15

    ..., wildlife and fisheries, lands and realty, hydrology, soils, sociology, and economics. Proposed planning... staff will work with cooperating agencies and all other interested groups, agencies, and individuals;...

  3. Sanitary landfill groundwater quality assessment plan Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Wells, D.G.; Cook, J.W.

    1990-06-01

    This assessment monitoring plan has been prepared in accordance with the guidance provided by the SCDHEC in a letter dated December 7, 1989 from Pearson to Wright and a letter dated October 9, 1989 from Keisler to Lindler. The letters are included a Appendix A, for informational purposes. Included in the plan are all of the monitoring data from the landfill monitoring wells for 1989, and a description of the present monitoring well network. The plan proposes thirty-two new wells and an extensive coring project that includes eleven soil borings. Locations of the proposed wells attempt to follow the SCDHEC guidelines and are downgradient, sidegradient and in the heart of suspected contaminant plumes. Also included in the plan is the current Savannah River Site Sampling and Analysis Plan and the well construction records for all of the existing monitoring wells around the sanitary landfill.

  4. The Role of Imaging in Patient Selection, Preoperative Planning, and Postoperative Monitoring in Human Upper Extremity Allotransplantation

    Science.gov (United States)

    Roth, Eira S.; Buck, David G.; Gorantla, Vijay S.; Losee, Joseph E.; Foust, Daniel E.; Britton, Cynthia A.

    2014-01-01

    Objective. To describe the role of imaging in vascular composite allotransplantation based on one institution's experience with upper extremity allotransplant patients. Methods. The institutional review board approved this review of HIPAA-compliant patient data without the need for individual consent. A retrospective review was performed of imaging from 2008 to 2011 on individuals undergoing upper extremity transplantation. This demonstrated that, of the 19 patients initially considered, 5 patients with a mean age of 37 underwent transplantation. Reports were correlated clinically to delineate which preoperative factors lead to patient selection versus disqualification and what concerns dictated postoperative imaging. Findings were subdivided into musculoskeletal and vascular imaging criterion. Results. Within the screening phase, musculoskeletal exclusion criterion included severe shoulder arthropathy, poor native bone integrity, and marked muscular atrophy. Vascular exclusion criterion included loss of sufficient arterial or venous supply and significant distortion of the native vascular architecture. Postoperative imaging was used to document healing and hardware integrity. Postsurgical angiography and ultrasound were used to monitor for endothelial proliferation or thrombosis as signs of rejection and vascular complication. Conclusion. Multimodality imaging is an integral component of vascular composite allotransplantation surgical planning and surveillance to maximize returning form and functionality while minimizing possible complications. PMID:24800056

  5. The Role of Imaging in Patient Selection, Preoperative Planning, and Postoperative Monitoring in Human Upper Extremity Allotransplantation

    Directory of Open Access Journals (Sweden)

    Eira S. Roth

    2014-01-01

    Full Text Available Objective. To describe the role of imaging in vascular composite allotransplantation based on one institution’s experience with upper extremity allotransplant patients. Methods. The institutional review board approved this review of HIPAA-compliant patient data without the need for individual consent. A retrospective review was performed of imaging from 2008 to 2011 on individuals undergoing upper extremity transplantation. This demonstrated that, of the 19 patients initially considered, 5 patients with a mean age of 37 underwent transplantation. Reports were correlated clinically to delineate which preoperative factors lead to patient selection versus disqualification and what concerns dictated postoperative imaging. Findings were subdivided into musculoskeletal and vascular imaging criterion. Results. Within the screening phase, musculoskeletal exclusion criterion included severe shoulder arthropathy, poor native bone integrity, and marked muscular atrophy. Vascular exclusion criterion included loss of sufficient arterial or venous supply and significant distortion of the native vascular architecture. Postoperative imaging was used to document healing and hardware integrity. Postsurgical angiography and ultrasound were used to monitor for endothelial proliferation or thrombosis as signs of rejection and vascular complication. Conclusion. Multimodality imaging is an integral component of vascular composite allotransplantation surgical planning and surveillance to maximize returning form and functionality while minimizing possible complications.

  6. Directors' duty of care to monitor information systems in HMOs: some lessons from the Oxford Health Plan.

    Science.gov (United States)

    O'Byrne, M E

    This paper examines the legal and strategic issues raised by the use of information systems in health maintenance organizations (HMOs) and other managed care organizations. Given the critical nature of information systems to an HMO's business success and regulatory compliance, the large financial investment HMOs make in their systems, and the widely publicized concerns over the year 2000 "millennium bug" problem, information systems are appropriately a matter of concern to an HMO's board of directors. The recent experience of Oxford Health Plans, Inc. offers a case study in the apparent failure of the directors to monitor adequately the in-house development of an information system. The systems disaster which this corporation suffered in 1997 led to a dramatic drop in stock price, from which the company has yet to recover, as well as intense scrutiny by state and federal regulators and countless shareholder derivative actions against the directors. Corporate directors are subject to the fiduciary duty of care. Despite statutes in some states requiring directors to act prudently, state courts almost always apply the standard of gross negligence. As a result, even when directors act without due deliberation in their decision, it is rare that a court will find them to have failed in their duty of care. The business and regulatory community may find otherwise, however, when directors fail to evaluate information systems options carefully and the business suffers as a result.

  7. The role of imaging in patient selection, preoperative planning, and postoperative monitoring in human upper extremity allotransplantation.

    Science.gov (United States)

    Roth, Eira S; Buck, David G; Gorantla, Vijay S; Losee, Joseph E; Foust, Daniel E; Britton, Cynthia A

    2014-01-01

    Objective. To describe the role of imaging in vascular composite allotransplantation based on one institution's experience with upper extremity allotransplant patients. Methods. The institutional review board approved this review of HIPAA-compliant patient data without the need for individual consent. A retrospective review was performed of imaging from 2008 to 2011 on individuals undergoing upper extremity transplantation. This demonstrated that, of the 19 patients initially considered, 5 patients with a mean age of 37 underwent transplantation. Reports were correlated clinically to delineate which preoperative factors lead to patient selection versus disqualification and what concerns dictated postoperative imaging. Findings were subdivided into musculoskeletal and vascular imaging criterion. Results. Within the screening phase, musculoskeletal exclusion criterion included severe shoulder arthropathy, poor native bone integrity, and marked muscular atrophy. Vascular exclusion criterion included loss of sufficient arterial or venous supply and significant distortion of the native vascular architecture. Postoperative imaging was used to document healing and hardware integrity. Postsurgical angiography and ultrasound were used to monitor for endothelial proliferation or thrombosis as signs of rejection and vascular complication. Conclusion. Multimodality imaging is an integral component of vascular composite allotransplantation surgical planning and surveillance to maximize returning form and functionality while minimizing possible complications.

  8. TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241-AY-101 MULTI-PROBE CORROSION MONITORING SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    WYRWAS RB; PAGE JS; COOKE GS

    2012-04-19

    This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 and in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.

  9. Quality Assurance Project Plan for the Environmental Monitoring Program in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    Waste Area Grouping (WAG) 6 is a hazardous and low-level radioactive waste disposal site at Oak Ridge National Laboratory (ORNL). Extensive site investigations have revealed contaminated surface water, sediments, groundwater, and soils. Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) conducted from 1989--1991 and on recent interactions with the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), a decision was made to defer implementing source control remedial measures at the WAG. The information shows WAG 6 contributes < 2% of the total off-site contaminant risk released over White Oak Dam (WOD). The alternative selected to address hazards at WAG 6 involves maintenance of site access controls to prevent public exposure to on-site contaminants, continued monitoring of contaminant releases to determine if source control measures will be required in the future, and development of technologies to support final remediation of WAG 6. This Quality Assurance Project Plan (QAPjP) has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (DOE/OR/01-1192&D1). Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model. The baseline monitoring phase is expected to begin in 1994 and continue for 12-18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC. The routine annual monitoring phase will continue for {approximately}4 years.

  10. 75 FR 32962 - Notice of Intent To Prepare a Resource Management Plan for the Carlsbad Field Office, New Mexico...

    Science.gov (United States)

    2010-06-10

    ... planning documents; 8. The BLM will work cooperatively and collaboratively with cooperating agencies and... questions and concerns that should be addressed in the plan. The BLM will work collaboratively with... resource management, wilderness, wild and scenic rivers, sociology and economics, and forest...

  11. 77 FR 33232 - Notice of Intent To Prepare Environmental Documents and Proposed Plan Amendments for Off-Highway...

    Science.gov (United States)

    2012-06-05

    ... brought forward from existing planning documents. The BLM will work collaboratively with cooperating..., soils, sociology, and economics. The Big Willow Route Designation and the Blacks Creek Reservoir Area... questions and concerns that should be addressed in the plan amendments. The BLM will work...

  12. 78 FR 39311 - Notice of Intent To Prepare a Resource Management Plan Amendment and an Associated Environmental...

    Science.gov (United States)

    2013-07-01

    ...; and, how would the proposed VRM classification affect recreation. The planning work will be completed... management questions and concerns that should be addressed in the plan. The BLM will work collaboratively..., botany, lands and realty, hydrology, soils, sociology, and economics. Authority: 40 CFR 1501.7 and 43...

  13. Batch and continuous flow preparation of Hantzsch 1,4-dihydropyridines under microwave heating and simultaneous real-time monitoring by Raman spectroscopy. An exploratory study.

    Science.gov (United States)

    Christiaens, Sylvain; Vantyghem, Xavier; Radoiu, Marilena; Vanden Eynde, Jean Jacques

    2014-07-09

    Dialkyl 1,4-dihydro-2,6-dimethylpyridine-3,5-dicarboxylates have been prepared in a batch mode under conventional heating as well as under continuous flow conditions in the Miniflow 200SS, Sairem's microwave-assisted batch and continuous flow equipment. Real-time monitoring of the reactions by Raman spectroscopy enabled to compare both heating modes and to determine (optimized) reaction times.

  14. Batch and Continuous Flow Preparation of Hantzsch 1,4-Dihydropyridines under Microwave Heating and Simultaneous Real-time Monitoring by Raman Spectroscopy. An Exploratory Study

    Directory of Open Access Journals (Sweden)

    Sylvain Christiaens

    2014-07-01

    Full Text Available Dialkyl 1,4-dihydro-2,6-dimethylpyridine-3,5-dicarboxylates have been prepared in a batch mode under conventional heating as well as under continuous flow conditions in the Miniflow 200SS, Sairem’s microwave-assisted batch and continuous flow equipment. Real-time monitoring of the reactions by Raman spectroscopy enabled to compare both heating modes and to determine (optimized reaction times.

  15. Fire Plans

    Science.gov (United States)

    Power, June

    2011-01-01

    Many libraries have disaster recovery plans, but not all have prevention and action plans to prepare for an emergency in advance. This article presents the author's review of the prevention and action plans of several libraries: (1) Evergreen State College; (2) Interlochen Public Library; (3) University of Maryland, Baltimore-Marshall Law Library;…

  16. Fire Plans

    Science.gov (United States)

    Power, June

    2011-01-01

    Many libraries have disaster recovery plans, but not all have prevention and action plans to prepare for an emergency in advance. This article presents the author's review of the prevention and action plans of several libraries: (1) Evergreen State College; (2) Interlochen Public Library; (3) University of Maryland, Baltimore-Marshall Law Library;…

  17. 42 CFR 137.360 - Does the Secretary approve project planning and design documents prepared by the Self-Governance...

    Science.gov (United States)

    2010-10-01

    ... design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and... documents prepared by the Self-Governance Tribe? The Secretary shall have at least one opportunity...

  18. Surgeon-performed touch preparation of breast core needle biopsies may provide accurate same-day diagnosis and expedite treatment planning.

    Science.gov (United States)

    Gadgil, Pranjali V; Korourian, Soheila; Malak, Sharp; Ochoa, Daniela; Lipschitz, Riley; Henry-Tillman, Ronda; Suzanne Klimberg, V

    2014-04-01

    We aimed to determine the accuracy of surgeon-performed touch-preparation cytology (TPC) of breast core-needle biopsies (CNB) and the ability to use TPC results to initiate treatment planning at the same patient visit. A single-institution retrospective review of TPC results of ultrasound-guided breast CNB was performed. All TPC slides were prepared by surgeons performing the biopsy and interpreted by the pathologist. TPC results were reported as positive/suspicious, atypical, negative/benign, or deferred; these were compared with final pathology of cores to calculate accuracy. Treatment planning was noted as having taken place if the patient had requisition of advanced imaging, referrals, or surgical planning undertaken during the same visit. Four hundred forty-seven CNB specimens with corresponding TPC were evaluated from 434 patient visits, and 203 samples (45.4 %) were malignant on final pathology. When the deferred, atypical, and benign results were considered negative and positive/suspicious results were considered positive, sensitivity and specificity were 83.7 % (77.9-88.5 %) and 98.4 % (95.9-99.6 %), respectively; positive and negative predictive values were 97.7 % (94.2-99.4 %) and 87.9 % (83.4-91.5 %), respectively. In practice, patients with atypical or deferred results were asked to await final pathology. An accurate same-day diagnosis (TPC positive/suspicious) was hence feasible in 83.7 % (170 of 203) of malignant and 79.5 % (194 of 244) of benign cases (TPC negative). Of patients who had a same-day diagnosis of a new malignancy, 77.3 % had treatment planning initiated at the same visit. Surgeon-performed TPC of breast CNB is an accurate method of same-day diagnosis that allows treatment planning to be initiated at the same visit and may serve to expedite patient care.

  19. 78 FR 25299 - Notice of Intent To Prepare a Resource Management Plan for the San Pedro Riparian National...

    Science.gov (United States)

    2013-04-30

    ... any management questions and concerns that should be addressed in the plan. The BLM will work..., sociology, and economics. Authority: 40 CFR 1501.7, 43 CFR 1610.2 Raymond Suazo, State Director....

  20. 75 FR 45650 - Notice of Intent To Prepare a Resource Management Plan for the Dominguez-Escalante National...

    Science.gov (United States)

    2010-08-03

    ... questions and concerns that should be addressed in the plan. The BLM will work collaboratively with... realty, hydrology, soils, sociology and economics. Authority: 40 CFR 1501.7, 43 CFR 1610. Lynn E....

  1. Seeps and springs sampling and analysis plant for the Environmental Monitoring Plan at Waste Area Grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the U.S. Department of Energy and operated by Lockheed Martin Energy System, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources.

  2. Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of various water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants.

  3. Thoughts on National Environmental Monitoring in"12th Five-Year Plan"%关于"十二五"国家环境监测的思考

    Institute of Scientific and Technical Information of China (English)

    万本太; 蒋火华

    2011-01-01

    根据环境监测面临的新形势和新任务,提出了"十二五"期间做好国家环境监测工作需在九个方面下功夫,并对国家环境监测"十二五"规划的有关内容提出了建议.%Based on the new situation and tasks faced by environmental monitoring field, the article proposed nine aspects which need to put more efforts in during the "12th Five-Year Plan" period and put forward recommendations to the content related to the national environmental monitoring in "12th Five-Year Plan".

  4. Broad Scale Monitoring in the US Forest Service: Institutional Challenges and Collaborative Opportunites for Improving Planning and Decision-Making in an Era of Climate Change

    Science.gov (United States)

    Wurtzebach, Z.

    2016-12-01

    In 2012, the United States Forest Service promulgated new rules to guide Forest planning efforts in accordance with the National Forest Management Act (NFMA). One important component of the 2012 rule is a requirement for Regionally coordinated cross-boundary "broad scale" monitoring strategies that are designed to inform and facilitate Forest-level adaptive management and planning. This presentation will examine institutional challenges and opportunites for developing effective broad scale monitoring strategies identified in 90 interviews with USFS staff and partner organizations, and collaborative workshops held in Colorado, Wyoming, Arizona, and New Mexico. Internal barriers to development include funding and human resource constraints, organizational culture, problematic incentives and accountability structures, data management issues, and administrative barriers to collaboration. However, we also identify several opportunities for leveraging interagency collaboration, facilitating multi-level coordination, generating efficiencies in data collection and analysis, and improving strategies for reporting and communication to Forest level decision-makers and relevant stakeholders.

  5. Stereotactic body radiation therapy for liver metastasis-Case report and review of the literature. The role of patient preparation, treatment planning and its delivery

    Directory of Open Access Journals (Sweden)

    Marta Adamczyk

    2014-01-01

    Results: The conventional 3-dimensional conformal plan, which fulfilled all dose constraints for target and organs at risk, was accepted for the treatment. Almost for all performed patient position verifications, on-line evaluated results were kept under 5 mm. Conclusions: The analysis presents the possible way of treating patients with liver metastasis. The SBRT treatment prepared and verified according our protocol can be implemented in clinical practice for a vast majority of such patients. The literature validation of our liver SBRT protocol showed that it has the potential for ensuring the effective and patient-friendly delivery.

  6. Department of Energy – Office of Science Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F.; Meier, Kirsten M.; Barnett, J. Matthew; Bisping, Lynn E.; Poston, Ted M.; Rhoads, Kathleen

    2011-12-21

    The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Depart¬ment of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environ¬mental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include the Main Document (this text), Attachment 1: Sampling and Analysis Plan, Attachment 2: Data Management Plan, and Attachment 3: Dose Assessment Guidance.

  7. 75 FR 19641 - Empire Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2010-04-15

    ... acreage would be restored and allowed to revert to former uses. About 31 percent of the planned pipeline... on or before May 7, 2010. For your convenience, there are three methods you can use to submit your... staff available to assist you at (202) 502-8258 or efiling@ferc.gov . (1) You may file your...

  8. 75 FR 41881 - Notice of Intent To Prepare a Shoreline Restoration and Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-07-19

    ... include: Restoration or replication of natural shoreline sand movement; foredune/dune restoration and... Impact Statement (EIS) for Indiana Dunes National Lakeshore, Indiana SUMMARY: Pursuant to Section 102(2... Restoration and Management Plan (SRMP) for Indiana Dunes National Lakeshore (Park), Indiana. The EIS will be...

  9. 75 FR 26986 - Notice of Intent To Prepare an Amendment to the Kobuk-Seward Peninsula Resource Management Plan...

    Science.gov (United States)

    2010-05-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR... Management Plan for the Squirrel River Special Recreation Management Area, Alaska AGENCY: Bureau of Land... travel management. This amendment and associated EA will meet the requirements of the...

  10. 77 FR 37032 - Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2012-06-20

    ... and operation of facilities by Questar Pipeline Company (Questar) in Duchesne County, Utah. The... convenience and necessity. This notice announces the opening of the scoping process the Commission will use to... about the acquisition of an easement to construct, operate, and maintain the planned facilities....

  11. The Use of Succession Planning to Prepare Future Leaders in Selected Federal Agencies at Aberdeen Proving Ground, MD

    Science.gov (United States)

    2011-05-01

    Chairman and CEO, an Indian mother of two daughters, as an example of a best-practice company in succession planning. Like the Army, PepsiCo recognized...senior level position, including the top position. That eventually led to PepsiCo selecting the best qualified person within the organization for the

  12. 75 FR 7517 - Notice of Intent To Prepare an Amendment to the Ring of Fire Resource Management Plan for the...

    Science.gov (United States)

    2010-02-19

    ... that are best suited to local, regional, and national needs and concerns. The preliminary issues and... Appendix C of the BLM Land Use Planning Handbook (H-1601-01); Identify development needs for the existing... scoping meetings in Anchorage through local news media, newsletters, and the BLM Web site (...

  13. Using the theory of planned behavior to examine pharmacists' intention to utilize a prescription drug monitoring program database.

    Science.gov (United States)

    Fleming, Marc L; Barner, Jamie C; Brown, Carolyn M; Shepherd, Marvin D; Strassels, Scott; Novak, Suzanne

    2014-01-01

    Prescription drug monitoring programs (PDMPs) are state-operated electronic databases that contain patients' controlled drug histories. Most states provide these data to pharmacists via online web portals to combat prescription drug abuse and diversion. The objectives of this study were to: 1) explore the theory of planned behavior's (TPB) utility in predicting Texas pharmacists' intention to utilize an online accessible PDMP; 2) to determine the contribution of each construct, attitude (A), subjective norm (SN) and perceived behavioral control (PBC) in predicting pharmacists' intention; and 3) test whether the addition of perceived obligation (PO) is significantly related to pharmacists' intention. A cross-sectional, 36-item questionnaire was developed from focus groups and literature of pharmacists' views regarding prescription drug abuse. A total of 998 practicing Texas community pharmacists were surveyed to collect data on their intention to utilize a PDMP database. Descriptive statistics, multivariate and hierarchical logistic regression analyses were used to address the study objectives. The response rate was 26.2% (261/998). TPB constructs were significant predictors of pharmacists' high intention to utilize the PDMP. Pharmacists with positive attitudes were almost twice as likely to have high intention (odds ratio [OR] = 1.8, 95% confidence interval [CI] = 1.2-2.8). SN was the strongest predictor of pharmacists' high intention (OR = 2.2, 95% CI = 1.4-3.3). Pharmacists with high PBC were also twice as likely to have high intention (OR = 1.9, 95% CI = 1.2-3.0). Additionally, pharmacists' PO contributed to the prediction of high intention (OR = 1.8, 95% CI = 1.0-3.1) above that explained by the TPB model constructs (X(2) = 4.14, P intention to utilize a PDMP database. Interventions that address pharmacists' A, SN, PBC, and PO may be valuable to increase pharmacists' high intention. Pharmacists' utilization of PDMPs may lead to a decrease in the morbidity and

  14. 77 FR 64824 - Notice of Intent To Prepare an Environmental Impact Statement, a Possible Land Use Plan Amendment...

    Science.gov (United States)

    2012-10-23

    ... continue to maintain the status quo, the BLM is segregating the above-described lands for a period of 2... Bureau of Land Management Notice of Intent To Prepare an Environmental Impact Statement, a Possible Land... AGENCY: Bureau of Land Management, Interior. ACTION: Notice. SUMMARY: In compliance with the...

  15. 75 FR 77654 - Notice of Intent To Prepare a Land Use Plan Amendment and an Environmental Impact Statement for...

    Science.gov (United States)

    2010-12-13

    ... (BLM) El Centro Field Office and Imperial County, California, intend to prepare a joint Environmental..., biological resources, recreation, cultural resources, water resources, geological resources, land use, noise... available for public review at the Bureau of Land Management, El Centro Field Office, 1661 South 4th Street...

  16. Racial differences in end-of-life planning: why don't Blacks and Latinos prepare for the inevitable?.

    Science.gov (United States)

    Carr, Deborah

    2011-01-01

    I evaluate the extent to which ethnic disparities in advance care planning reflect cultural and religious attitudes and experience with the painful deaths of loved ones. Data are from a sample of 293 chronically ill older adults who are seeking care at one of two large medical centers in urban New Jersey. Blacks and Hispanics are significantly less likely than Whites to have a living will, a durable power of attorney for health care (DPAHC), and to have discussed their end of life treatment preferences. Multivariate analyses reveal that the Black-White gap in advance care planning is largely accounted for by Blacks' belief that God controls the timing and nature of death. The Hispanic-White gap is partially accounted for by the belief that one's illness negatively affects one's family. Ethnic disparities are starkest for living will and DPAHC use, and less pronounced for discussions. Implications for policy and practice are discussed.

  17. Lessons learned from the preparation of the flood risk management plans on the Seine basin and perspectives

    Directory of Open Access Journals (Sweden)

    Dupray Sébastien

    2016-01-01

    Full Text Available The present paper presents how the flood directive has been implemented on the Seine and coastal rivers of Normandy basin. It presents the various steps and details the elaboration of the basin flood risk management plan (PGRI. Though out of the scope of the present paper, the new responsibility in term of flood prevention given to local authorities will be briefly introduced and discussed with reference to the implementation of the flood directive.

  18. Characterize and explore potential sites and prepare research and development plan (site investigation study). Final draft. Task 2. Milestone report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-01

    A specific research and development plan to investigate the behavior and suitability of aquifers as compressed air energy storage (CAES) sites is presented. The proposed effort will evaluate present uncertainties in the performance of the underground energy storage subsystem and its impact on above ground plant design and cost. The project is planned to provide the utility industry with a quantitative basis for confidence that financial commitment to a demonstration plant and subsequent expansion is justified and poses acceptable risks. Activities in Phase II of a 5-phase overall CAES development program are reported. Information is included on the development of field testing specifications and schedules; selection of specific site for the conceptual design; development plan and schedule for the media site; development of analytical models of aquifer airflow; and well drilling requirements. As a result of these studies 14 sites in Illinois and Indiana were evaluated, 7 were ranked for suitability for CAES, and 4 were selected for possible use in the field testing program. Test procedures, the mathematical models and drilling requirments were developed. (LCL)

  19. Evidence for deficient motor planning in ADHD.

    Science.gov (United States)

    Anat, Dahan; Miriam, Reiner

    2017-08-29

    We compare motor planning mechanisms of ADHD and control subjects based on their effect on later observed kinematic characteristics. We monitor hand movement following planning conditions that differ in preparation time, and evaluate the differences across conditions and participants with/without ADHD. Our findings show that when there is sufficient planning time, people without ADHD seem to have a motor plan ready, and immediately initiate a planned movement after a 'GO' cue, with a bell shaped velocity profile. When planning time is not sufficient, they start the movement in a delayed time, possibly indicating that they needed to complete a movement plan. However, people with ADHD, did not start movement immediately after the cue, even when provided with a long preparation time, possibly indicating that even for this planning interval they did not have a motion plan ready. The movement was not only delayed, its velocity profile was not bell shaped and had several peaks. We further found differences between control and ADHD participants in the velocity profile, variability and jitter of movements. Our results suggest that ADHD motion characteristics, are associated with an immature motor plan. Based on the results we propose a paradigm to evaluate deficiencies in motor planning.

  20. The Preparation of Electronic Assembly Process Planning%电子装配工艺规程的编制

    Institute of Scientific and Technical Information of China (English)

    弥锐

    2011-01-01

    工艺文件是产品生产重要的技术文件之一,本文从企业生产一线工艺的角度论述了工艺文件的两大组成部分、电子产品工艺文件的成套性编制和工艺文件的管理,着重讲述了指导技术操作的工艺文件--工艺规程的编制.%The process file is one of important technical documents of product production. This paper discussed two major components of process documents, the preparation of sets of technical documents and the management of process documents from the point of production line process, highlighted the preparation of technical documents which guide the technical operation.