WorldWideScience

Sample records for monitoring plan emp

  1. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Althouse, P E; Bertoldo, N A; Bowen, B M; Brown, R A; Campbell, C G; Christofferson, E; Gallegos, G M; Grayson, A R; Jones, H E; Larson, J M; Laycak, D; Mathews, S; Peterson, S R; Revelli, M J; Rueppel, D; Williams, R A; Wilson, K; Woods, N

    2005-11-23

    The purpose of the environmental monitoring plan (EMP) is to promote the early identification of, and response to, potential adverse environmental impacts associated with DOE operations. Environmental monitoring supports the Integrated Safety Management System (ISMS) to detect, characterize, and respond to releases from DOE activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of the DOE activity. In addition, the EMP addresses the analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of radionuclide samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. Until recently, environmental monitoring at Lawrence Livermore National Laboratory (LLNL) was required by DOE Order 5400.1, which was canceled in January 2003. LLNL is in the process of adopting the ISO 14001 Environmental Management Systems standard, which contains requirements to perform and document environmental monitoring. The ISO 14001 standard is not as prescriptive as DOE Order 5400.1, which expressly required an EMP. LLNL will continue to prepare the EMP because it provides an organizational framework for ensuring that the work is conducted appropriately. The environmental monitoring addressed by the plan includes preoperational characterization and assessment, and effluent and surveillance monitoring. Additional environmental monitoring is conducted at LLNL as part of the compliance with the

  2. Management plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.; Pratt, D.R.

    1991-08-01

    The DOE/RL 89-19, United States Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (1989), requires the Hanford Site to prepare an Environmental Monitoring Plan (EMP) by November 9, 1991. The DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (1991), provides additional guidance and requires implementation of the EMP within 36 months of the effective data of the rule. DOE Order 5400.1, General Environmental Protection Program, requires each US Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials to prepare an EMP. This EMP is to identify and discuss two major activities: (1) effluent monitoring and (2) environmental surveillance. At the Hanford Site, the site-wide EMP will consist of the following elements: (1) A conceptual plan addressing effluent monitoring and environmental surveillance; (2) Pacific Northwest Laboratory (PNL) site-wide environmental surveillance program; (3) Westinghouse Hanford Company (Westinghouse Hanford) effluent monitoring program consisting of the near-field operations environmental monitoring activities and abstracts of each Facility Effluent Monitoring Plan (FEMP). This management plan addresses the third of these three elements of the EMP, the FEMPs.

  3. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  4. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Althouse, P E; Biermann, A; Brigdon, S L; Brown, R A; Campbell, C G; Christofferson, E; Clark, L M; Folks, K J; Gallegos, G M; Gouveia, F J; Grayson, A; Harrach, R J; Hoppes, W G; Jones, H; Mathews, S; Merrigan, J R; Peterson, S R; Revelli, M; Rueppel, D; Sanchez, L; Tate, P J; Vellinger, R J; Ward, B; Williams, R

    2006-01-10

    Environmental monitoring personnel from Lawrence Livermore National Laboratory (LLNL) prepared this ''Environmental Monitoring Plan'' (EMP) to meet the requirements in the U.S. Department of Energy (DOE) ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' (DOE 1991) and applicable portions of DOE Orders 5400.1 and 5400.5 (see WSS B93 and B94 in Appendix B). ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' is followed as a best management practice; under Work Smart Standards, LLNL complies with portions of DOE Orders 5400.1 and 5400.5 as shown in Appendix B. This document is a revision of the May 1999 EMP (Tate et al. 1999) and is current as of March 1, 2002. LLNL is one of the nation's premier applied-science national security laboratories. Its primary mission is to ensure that the nation's nuclear weapons remain safe, secure, and reliable, and to prevent the spread and use of nuclear weapons worldwide. LLNL's programs in advanced technologies, energy, environment, biosciences, and basic science apply LLNL's unique capabilities and enhance the competencies needed for this national security mission. LLNL's mission also involves working with industrial and academic partners to increase national competitiveness and improve science education. LLNL's mission is dynamic and has changed over the years to meet new national needs. In keeping with the Laboratory's mission, the environment, safety, and health (ES&H) have top priority. LLNL's policy is to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage. The environment, safety, and health are to be priority considerations in the planning and execution of all work activities at the Laboratory (LLNL 2001

  5. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  6. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  7. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-03-12

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  8. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-02-19

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  9. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-02-19

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  10. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  11. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Paquette, D.; Lee, R. [and others

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  12. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  13. Environmental monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  14. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  15. Rulison Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile

  16. Arctic Terrestrial Biodiversity Monitoring Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    The Conservation of Arctic Flora and Fauna (CAFF), the biodiversity working group of the Arctic Council, established the Circumpolar Biodiversity Monitoring Program (CBMP) to address the need for coordinated and standardized monitoring of Arctic environments. The CBMP includes an international...... on developing and implementing long-term plans for monitoring the integrity of Arctic biomes: terrestrial, marine, freshwater, and coastal (under development) environments. The CBMP Terrestrial Expert Monitoring Group (CBMP-TEMG) has developed the Arctic Terrestrial Biodiversity Monitoring Plan (CBMP......-Terrestrial Plan/the Plan) as the framework for coordinated, long-term Arctic terrestrial biodiversity monitoring. The goal of the CBMP-Terrestrial Plan is to improve the collective ability of Arctic traditional knowledge (TK) holders, northern communities, and scientists to detect, understand and report on long...

  17. 40 CFR 74.61 - Monitoring plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this...

  18. Habitat monitoring plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management of habitat is required in order to achieve the refuge purpose and wildlife objectives. The Upland Habitat Management Plan (1993, Interim Plan) and the...

  19. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Sharon D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  20. TNO monitoring plan development tool

    NARCIS (Netherlands)

    Sijacic, D.; Wildenborg, T.; Steeghs, P.

    2014-01-01

    TNO has developed a software tool that supports the design of a risk-based monitoring plan for a CO2 storage site. The purpose of the tool is to aid storage site operators by facilitating a structured monitoring technologies selection or evaluation process. The tool makes a selection this recommende

  1. Arctic Terrestrial Biodiversity Monitoring Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    The Conservation of Arctic Flora and Fauna (CAFF), the biodiversity working group of the Arctic Council, established the Circumpolar Biodiversity Monitoring Program (CBMP) to address the need for coordinated and standardized monitoring of Arctic environments. The CBMP includes an international...... network of scientists, conservation organizations, government agencies, Permanent Participants Arctic community experts and leaders. Using an ecosystem-based monitoring approach which includes species, ecological functions, ecosystems, their interactions, and potential drivers, the CBMP focuses...... on developing and implementing long-term plans for monitoring the integrity of Arctic biomes: terrestrial, marine, freshwater, and coastal (under development) environments. The CBMP Terrestrial Expert Monitoring Group (CBMP-TEMG) has developed the Arctic Terrestrial Biodiversity Monitoring Plan (CBMP...

  2. Comparison of equilibrium ohmic and nonequilibrium swarm models for monitoring conduction electron evolution in high-altitude EMP calculations

    Science.gov (United States)

    Pusateri, Elise N.; Morris, Heidi E.; Nelson, Eric; Ji, Wei

    2016-10-01

    Atmospheric electromagnetic pulse (EMP) events are important physical phenomena that occur through both man-made and natural processes. Radiation-induced currents and voltages in EMP can couple with electrical systems, such as those found in satellites, and cause significant damage. Due to the disruptive nature of EMP, it is important to accurately predict EMP evolution and propagation with computational models. CHAP-LA (Compton High Altitude Pulse-Los Alamos) is a state-of-the-art EMP code that solves Maxwell's equations for gamma source-induced electromagnetic fields in the atmosphere. In EMP, low-energy, conduction electrons constitute a conduction current that limits the EMP by opposing the Compton current. CHAP-LA calculates the conduction current using an equilibrium ohmic model. The equilibrium model works well at low altitudes, where the electron energy equilibration time is short compared to the rise time or duration of the EMP. At high altitudes, the equilibration time increases beyond the EMP rise time and the predicted equilibrium ionization rate becomes very large. The ohmic model predicts an unphysically large production of conduction electrons which prematurely and abruptly shorts the EMP in the simulation code. An electron swarm model, which implicitly accounts for the time evolution of the conduction electron energy distribution, can be used to overcome the limitations exhibited by the equilibrium ohmic model. We have developed and validated an electron swarm model previously in Pusateri et al. (2015). Here we demonstrate EMP damping behavior caused by the ohmic model at high altitudes and show improvements on high-altitude, upward EMP modeling obtained by integrating a swarm model into CHAP-LA.

  3. Improving high-altitude emp modeling capabilities by using a non-equilibrium electron swarm model to monitor conduction electron evolution

    Science.gov (United States)

    Pusateri, Elise Noel

    abruptly. The objective of the PhD research is to mitigate this effect by integrating a conduction electron model into CHAP-LA which can calculate the conduction current based on a non-equilibrium electron distribution. We propose to use an electron swarm model to monitor the time evolution of conduction electrons in the EMP environment which is characterized by electric field and pressure. Swarm theory uses various collision frequencies and reaction rates to study how the electron distribution and the resultant transport coefficients change with time, ultimately reaching an equilibrium distribution. Validation of the swarm model we develop is a necessary step for completion of the thesis work. After validation, the swarm model is integrated in the air chemistry model CHAP-LA employs for conduction electron simulations. We test high altitude EMP simulations with the swarm model option in the air chemistry model to show improvements in the computational capability of CHAP-LA. A swarm model has been developed that is based on a previous swarm model developed by Higgins, Longmire and O'Dell 1973, hereinafter HLO. The code used for the swarm model calculation solves a system of coupled differential equations for electric field, electron temperature, electron number density, and drift velocity. Important swarm parameters, including the momentum transfer collision frequency, energy transfer collision frequency, and ionization rate, are recalculated and compared to the previously reported empirical results given by HLO. These swarm parameters are found using BOLSIG+, a two term Boltzmann solver developed by Hagelaar and Pitchford 2005. BOLSIG+ utilizes updated electron scattering cross sections that are defined over an expanded energy range found in the atomic and molecular cross section database published by Phelps in the Phelps Database 2014 on the LXcat website created by Pancheshnyi et al. 2012. The swarm model is also updated from the original HLO model by including

  4. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  5. BNL ENVIRONMENTAL MONITORING PLAN TRIENNIAL UPDATE, JANUARY 2003.

    Energy Technology Data Exchange (ETDEWEB)

    BROOKHAVEN NATIONAL LABORATORY

    2003-01-01

    Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on site enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.

  6. Groundwater level monitoring sampling and analysis plan for the environmental monitoring plan at waste area grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document is the Groundwater Level Monitoring Sampling and Analysis Plan (SAP) for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). Note that this document is referred to as a SAP even though no sampling and analysis will be conducted. The term SAP is used for consistency. The procedures described herein are part of the Environmental Monitoring Plan (EMP) for WAG 6, which also includes monitoring tasks for seeps and springs, groundwater quality, surface water, and meteorological parameters. Separate SAPs are being issued concurrently to describe each of these monitoring programs. This SAP has been written for the use of the field personnel responsible for implementation of the EMP, with the intent that the field personnel will be able to take these documents to the field and quickly find the appropriate steps required to complete a specific task. In many cases, Field Operations Procedures (FOPs) will define the steps required for an activity. The FOPs for the EMP are referenced and briefly described in the relevant sections of the SAPs, and are contained within the FOP Manual. Both these documents (the SAP and the FOP Manual) will be available to personnel in the field.

  7. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

  8. Monitoring rationale, strategy, issues, and methods: UMRR-EMP LTRMP fish component

    Science.gov (United States)

    Ickes, Brian S.; Sauer, Jennifer S.; Rogala, James T.

    2014-01-01

    The Long Term Resource Monitoring Program (LTRMP), an element of the multiagency partnership Upper Mississippi River Restoration-Environmental Management Program, has been monitoring fishes in the Upper Mississippi River System (UMRS) for over two decades, using scientific and highly standardized methods. Today, the LTRMP’s data assets represent one of the world’s largest and most extensive datasets on a great river. Methods and procedures used over the past two decades have been documented and have proven a key tool towards gaining data that are (a) scientifically valid, (b) comparable over time, and (c) comparable over space. These procedures manuals coordinate and standardize methods, procedures, and field behaviors in the execution of long-term monitoring, permitting the informed management and control of important sources of error actually under program control. As LTRMP databases have matured in scope and accumulated more years' worth of data, their utility in research and management in the UMRS basin has increased notably. To maximize their utility, data users need not only be aware of “how the data were collected,” as portrayed in the procedures manuals, but also “why the data were collected in the way they were, at the scales they were, and in the manner that they were.” Whereas the procedures manuals contribute information as to the “how” the data were gained, this document seeks to contribute information as to the “why.” As such, this document is intended to be a companion document to the procedures manuals. Herein, we present information on the rationale for monitoring nearly one-fifth of the entire North American freshwater fish fauna (representing the greatest freshwater fish diversity on the planet at temperate latitudes); strategies employed and their reasoning; and discussions on issues associated with the sampling design itself, data arising therefrom, and uses of those data in different contexts.

  9. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  10. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  11. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  12. Idaho National Laboratory Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  13. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse Electric Company Waste Isolation Division

    1999-09-29

    DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures

  14. Addendum to Environmental Monitoring Plan, Nevada Test Site and Support Facilities; Addendum 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This 1993 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/10630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Operations Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1993 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  15. Little River NWR Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan for Little River National Wildlife Refuge is a step-down from the Comprehensive Conservation Plan and Forest Habitat Management...

  16. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  17. Integrated monitoring plan for the Hanford groundwater monitoring project

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, M.J.; Dresel, P.E.; McDonald, J.P.; Mercer, R.B.; Newcomer, D.R.; Thornton, E.C.

    1998-09-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy (DOE) manages these activities through the Hanford Groundwater Monitoring Project (groundwater project), which is the responsibility of Pacific Northwest National Laboratory. The groundwater project does not include all of the monitoring to assess performance of groundwater remediation or all monitoring associated with active facilities. This document is the first integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; other, established monitoring plans by reference; and a master well/constituent/frequency matrix for the entire Hanford Site.

  18. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Jenifer Nordstrom

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  19. The circumpolar biodiversity monitoring program - Terrestrial plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    The Circumpolar Biodiversity Monitoring Program, CBMP, Terrestrial Plan, www.caff.is/terrestrial, is a framework to focus and coordinate monitoring of terrestrial biodiversity across the Arctic. The goal of the plan is to improve the collective ability of Arctic traditional knowledge (TK) holders......, northern communities, and scientists to detect, understand and report on long-term change in Arctic terrestrial ecosystems and biodiversity. This presentation will outline the key management questions the plan aims to address and the proposed nested, multi-scaled approach linking targeted, research based...... monitoring with survey-based monitoring and remotely sensed data. The CBMP Terrestrial Plan intends to build upon and expand existing monitoring networks, engaging participants across a range of capacity and interests. The presentation will summarize the recommended focal soil ecosystem components...

  20. Modeling High Altitude EMP using a Non-Equilibrium Electron Swarm Model to Monitor Conduction Electron Evolution (LA-UR-15-26151)

    Science.gov (United States)

    Pusateri, E. N.; Morris, H. E.; Nelson, E.; Ji, W.

    2015-12-01

    Electromagnetic pulse (EMP) events in the atmosphere are important physical phenomena that occur through both man-made and natural processes, such as lightning, and can be disruptive to surrounding electrical systems. Due to the disruptive nature of EMP, it is important to accurately predict EMP evolution and propagation with computational models. In EMP, low-energy conduction electrons are produced from Compton electron or photoelectron ionizations with air. These conduction electrons continue to interact with the surrounding air and alter the EMP waveform. Many EMP simulation codes use an equilibrium ohmic model for computing the conduction current. The equilibrium model works well when the equilibration time is short compared to the rise time or duration of the EMP. However, at high altitude, the conduction electron equilibration time can be comparable to or longer than the rise time or duration of the EMP. This matters, for example, when calculating the EMP propagating upward toward a satellite. In these scenarios, the equilibrium ionization rate becomes very large for even a modest electric field. The ohmic model produces an unphysically large number of conduction electrons that prematurely and abruptly short the EMP in the simulation code. An electron swarm model, which simulates the time evolution of conduction electrons, can be used to overcome the limitations exhibited by the equilibrium ohmic model. We have developed and validated an electron swarm model in an environment characterized by electric field and pressure previously in Pusateri et al. (2015). This swarm model has been integrated into CHAP-LA, a state-of-the-art EMP code developed by researchers at Los Alamos National Laboratory, which previously calculated conduction current using an ohmic model. We demonstrate the EMP damping behavior caused by the ohmic model at high altitudes and show improvements on high altitude EMP modeling obtained by employing the swarm model.

  1. Geographic information system planning and monitoring best ...

    African Journals Online (AJOL)

    emeje

    Key words: GIS, Urban Planning, Urban Monitoring, West Africa, Best Practices, Pollution, flooding .... infrastructure and space, evident in cities such as Lagos,. Kano ... earmarked as green belts are being taken over by corner shops, roads ...

  2. Monitoring Hazardous Fuels Treatments: Southeast Regional Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this document is to provide technical guidance on monitoring activities to refuge staff involved in planning and conducting hazardous fuel treatments....

  3. Environmental Monitoring Plan - February 2016

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bertoldo, N. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Blake, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fish, C. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Grayson, A. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Griffin, D. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jones, H. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Patterson, L. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Revelli, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rosene, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wegrecki, T M; Williams, R A; Wilson, K R

    2016-02-08

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection oft/ic Pubile and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the hiota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements.

  4. The Circumpolar Biodiversity Monitoring Program Terrestrial Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    The Conservation of Arctic Flora and Fauna (CAFF), the biodiversity working group of the Arctic Council, established the Circumpolar Biodiversity Monitoring Program (CBMP) to address the need for coordinated and standardized monitoring of Arctic environments in terrestrial, marine, freshwater...... and coastal environments. The CBMP Terrestrial Plan is a framework to focus and coordinate monitoring of terrestrial biodiversity across the Arctic. The goal of the plan is to improve the collective ability of Arctic traditional knowledge (TK) holders, northern communities, and scientists to detect......, understand and report on long-term change in Arctic terrestrial ecosystems and biodiversity, and to identify knowledge gaps and priorities. This poster will outline the key management questions the plan aims to address and the proposed nested, multi-scaled approach linking targeted, research based monitoring...

  5. Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This document presents the Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG) 6 at the Oak Ridge National Laboratory (ORNL). Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and on subsequent discussions with regulators, a decision was made to defer implementing source control remedial measures at the WAG. The alternative selected to address the risks associated with WAG 6 involves maintenance of site access controls prevent public exposure to on-site contaminants, continued monitoring of contaminant releases determine if source control measures are required, and development of technologies that could support the final remediation of WAG 6. Although active source control measures are not being implemented at WAG 6, environmental monitoring is necessary to ensure that any potential changes in contaminant release from the WAG are identified early enough to take appropriate action. Two types of environmental monitoring will be conducted: baseline monitoring and annual routine monitoring. The baseline monitoring will be conducted to establish the baseline contaminant release conditions at the WAG, confirm the site-related chemicals of concern (COCs), and gather data to confirm the site hydrologic model. The baseline monitoring is expected to begin in 1994 and last for 12--18 months. The annual routine monitoring will consist of continued sampling and analyses of COCs to determine off-WAG contaminant flux and risk, identify mills in releases, and confirm the primary contributors to risk. The annual routine monitoring will continue for {approximately} 4 years after completion of the baseline monitoring.

  6. Marbled murrelet effectiveness monitoring plan for the Northwest Forest Plan.

    Science.gov (United States)

    Sarah Madsen; Diane Evans; Thomas Hamer; Paul Henson; Sherri Miller; S. Kim Nelson; Daniel Roby; Martin. Stapanian

    1999-01-01

    This report describes options for effectiveness monitoring of long-term status and trends to evaluate the success of the Northwest Forest Plan in maintaining and restoring marbled murrelet nesting habitat and populations on Federal lands. A two-phase approach is described that begins with developing reliable and repeatable processes for identifying nesting habitat and...

  7. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1998-12-31

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  8. COLLABORATIVE MULTI-LEVEL PLAN MONITORING

    Directory of Open Access Journals (Sweden)

    Mohamad K. ALLOUCHE

    2011-01-01

    Full Text Available The recent worldwide connectivity and the net-centricity of military operations (coalition-based operations are witnessing an increasing need for the monitoring of plan execution for enhanced resource management and decision making. Monitoring of ongoing operations is the process of continuous observation recording and reporting. In this process the plan becomes a resource that needs to be managed effi ciently. The centralized approach to plan monitoring soon reaches its limits when plan execution is distributed across different organizations/countries. We propose a new framework that would allow different monitoring nodes distributed across the network. An effi cient propagation mechanism that allows information exchange between the different nodes would also be needed. The main purpose of this mechanism is to present the right information, to the right person, at the right time. To cope with a rapid increase of information fl ow through the network, an effi cient alarm management mechanism allows the presentation of the information with an appropriate level of details.

  9. EMP coupling to ships

    Energy Technology Data Exchange (ETDEWEB)

    Deadrick, F.J.; Cabayan, H.S.; Kunz, K.F.; Bevensee, R.M.; Martin, L.C.; Egbert, R.W.

    1980-01-01

    Scale-model tests were conducted to establish the adequacy and limitations of model measurements as tools for predicting electromagnetic pulse (EMP) coupling voltages and currents to the critical antennas, cables, and metallic structures on ships. The scale-model predictions are compared with the results of the full-scale EMP simulation test of the Canadian ASW ship, HMCS Huron. (The EMP coupling predictions in this report were made without prior knowledge of the results of the data from the HMCS Huron tests.) This report establishes that the scale-model tests in conjunction with the data base from EMP coupling modules provides the necessary information for source model development and permits effective, low-cost study of particular system configurations. 184 figures, 9 tables.

  10. Monitored Geologic Repository Test Evaluation Plan

    Energy Technology Data Exchange (ETDEWEB)

    M.B. Skorska

    2002-01-02

    The Monitored Geologic Repository test & evaluation program will specify tests, demonstrations, examinations, and analyses, and describe procedures to conduct and document testing necessary to verify meeting Monitored Geologic Repository requirements for a safe and effective geologic repository for radioactive waste. This test program will provide assurance that the repository is performing as designed, and that the barriers perform as expected; it will also develop supporting documentation to support the licensing process and to demonstrate compliance with codes, standards, and regulations. This comprehensive program addresses all aspects of verification from the development of test requirements to the performance of tests and reporting of the test results. The ''Monitored Geologic Repository Test & Evaluation Plan'' provides a detailed description of the test program approach necessary to achieve the above test program objectives. This test plan incorporates a set of test phases focused on ensuring repository safety and operational readiness and implements a project-wide integrated product management team approach to facilitate test program planning, analysis, and implementation. The following sections provide a description of the individual test phases, the methodology for test program planning and analyses, and the management approach for implementing these activities.

  11. Groundwater Monitoring Plan for the Solid Waste Landfill

    Energy Technology Data Exchange (ETDEWEB)

    Lindberg, Jonathan W.; Chou, Charissa J.

    2000-10-13

    This monitoring plan includes well and constituent lists, and summarizes sampling, analytical, and quality control requirements. Changes from the previous monitoring plan include elimination of two radionuclides from the analyte list and some minor changes in the statistical analysis.

  12. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    Energy Technology Data Exchange (ETDEWEB)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.

  13. Facility effluent monitoring plan for the fast flux test facility

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J M; Dahl, N R

    1992-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in US Department of Energy Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A Facility Effluent Monitoring Plan determination was performed during calendar year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  14. Ranch business planning and resource monitoring for rangeland sustainability

    Science.gov (United States)

    Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite

    2012-01-01

    Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...

  15. FY 2002 Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

    2001-10-31

    This document is an integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders ("surveillance monitoring"); other, established monitoring plans by reference; and a master well/ constituent/frequency matrix for the entire Hanford Site.

  16. Least tern monitoring plan at Kirwin Reservoir [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This monitoring plan was developed in accordance with the environmental commitment plan contained in the final environmental assessment (FEA) and Finding of No...

  17. Habitat Monitoring and Inventory Plan : Malheur National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the Habitat Monitoring and Inventory Plan for Malheur National Wildlife Refuge. The goal of this plan is to develop an annual procedure to determine the...

  18. Salton Sea ecosystem monitoring and assessment plan

    Science.gov (United States)

    Case(compiler), H. L.; Boles, Jerry; Delgado, Arturo; Nguyen, Thang; Osugi, Doug; Barnum, Douglas A.; Decker, Drew; Steinberg, Steven; Steinberg, Sheila; Keene, Charles; White, Kristina; Lupo, Tom; Gen, Sheldon; Baerenklau, Ken A.

    2013-01-01

    The Salton Sea, California’s largest lake, provides essential habitat for several fish and wildlife species and is an important cultural and recreational resource. It has no outlet, and dissolved salts contained in the inflows concentrate in the Salton Sea through evaporation. The salinity of the Salton Sea, which is currently nearly one and a half times the salinity of ocean water, has been increasing as a result of evaporative processes and low freshwater inputs. Further reductions in inflows from water conservation, recycling, and transfers will lower the level of the Salton Sea and accelerate the rate of salinity increases, reduce the suitability of fish and wildlife habitat, and affect air quality by exposing lakebed playa that could generate dust. Legislation enacted in 2003 to implement the Quantification Settlement Agreement (QSA) stated the Legislature’s intent for the State of California to undertake the restoration of the Salton Sea ecosystem. As required by the legislation, the California Resources Agency (now California Natural Resources Agency) produced the Salton Sea Ecosystem Restoration Study and final Programmatic Environmental Impact Report (PEIR; California Resources Agency, 2007) with the stated purpose to “develop a preferred alternative by exploring alternative ways to restore important ecological functions of the Salton Sea that have existed for about 100 years.” A decision regarding a preferred alternative currently resides with the California State Legislature (Legislature), which has yet to take action. As part of efforts to identify an ecosystem restoration program for the Salton Sea, and in anticipation of direction from the Legislature, the California Department of Water Resources (DWR), California Department of Fish and Wildlife (CDFW), U.S. Bureau of Reclamation (Reclamation), and U.S. Geological Survey (USGS) established a team to develop a monitoring and assessment plan (MAP). This plan is the product of that effort. The

  19. Inventory and Monitoring Plan Dahomey National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) documents the inventory and monitoring surveys that will or could be conducted at Dahomey NWR from 2015 through 2030, or...

  20. Inventory and Monitoring Plan Coldwater River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) documents the inventory and monitoring surveys that will or could be conducted at Coldwater River NWR from 2016 through...

  1. Inventory and Monitoring Plan for Two Rivers National Wildlife Refuge.

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This inventory and monitoring plan (IMP) documents the inventory and monitoring surveys thatwill be conducted at Two Rivers National Wildlife Refuge from 2014...

  2. Inventory and Monitoring Plan for Deep Fork National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) is prepared to document the inventory and monitoring surveys that will, or could be conducted at Deep Fork National Wildlife...

  3. Inventory and Monitoring Plan for Cypress Creek National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) documents the inventory and monitoring surveys that will be conducted at Cypress Creek National Wildlife Refuge (CCNWR) from...

  4. Port Louisa National Wildlife Refuge Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This inventory and monitoring plan (IMP) documents the inventory and monitoring surveys that will be conducted at Port Louisa National Wildlife Refuge (NWR) from...

  5. Facility Effluent Monitoring Plan determinations for the 600 Area facilities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.

    1991-08-01

    This document determines the need for Facility Effluent Monitoring Plans for Westinghouse Hanford Company's 600 Area facilities on the Hanford Site. The Facility Effluent Monitoring Plan determinations were prepared in accordance with A Guide For Preparing Hanford Site Facility Effluent Monitoring Plans (WHC 1991). Five major Westinghouse Hanford Company facilities in the 600 Area were evaluated: the Purge Water Storage Facility, 212-N, -P, and -R Facilities, the 616 Facility, and the 213-J K Storage Vaults. Of the five major facilities evaluated in the 600 Area, none will require preparation of a Facility Effluent Monitoring Plan.

  6. Facility effluent monitoring plan for the tank farm facility

    Energy Technology Data Exchange (ETDEWEB)

    Crummel, G.M.

    1998-05-18

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  7. Facility effluent monitoring plan for the plutonium uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  8. Near-facility environmental monitoring quality assurance project plan

    Energy Technology Data Exchange (ETDEWEB)

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  9. Chapter 3. Planning and design for habitat monitoring

    Science.gov (United States)

    Christina D. Vojta; Lyman L. McDonald; C. Kenneth Brewer; Kevin S. McKelvey; Mary M Rowland; Michael I. Goldstein

    2013-01-01

    This chapter provides guidance for designing a habitat monitoring program so that it will meet the monitoring objective, will be repeatable, and will adequately represent habitat within the spatial extent of interest. Although a number of excellent resources are available for planning and designing a monitoring program for wildlife populations (e.g., Busch and Trexler...

  10. Facility effluent monitoring plan for 242-A evaporator facility

    Energy Technology Data Exchange (ETDEWEB)

    Crummel, G.M.; Gustavson, R.D.

    1995-02-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years.

  11. Department of Energy – Office of Science Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F.; Meier, Kirsten M.; Barnett, J. Matthew; Bisping, Lynn E.; Poston, Ted M.; Rhoads, Kathleen

    2011-12-21

    The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Depart¬ment of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environ¬mental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include the Main Document (this text), Attachment 1: Sampling and Analysis Plan, Attachment 2: Data Management Plan, and Attachment 3: Dose Assessment Guidance.

  12. Facility effluent monitoring plan for the 327 Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    The 327 Facility [Post-Irradiation Testing Laboratory] provides office and laboratory space for Pacific Northwest Laboratory (PNL) scientific and engineering staff conducting multidisciplinary research in the areas of post-irradiated fuels and structural materials. The facility is designed to accommodate the use of radioactive and hazardous materials in the conduct of these activities. This report summarizes the airborne emissions and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

  13. Facility effluent monitoring plan for WESF

    Energy Technology Data Exchange (ETDEWEB)

    SIMMONS, F.M.

    1999-09-01

    The FEMP for the Waste Encapsulation and Storage Facility (WESF) provides sufficient information on the WESF effluent characteristics and the effluent monitoring systems so that a compliance assessment against applicable requirements may be performed. Radioactive and hazardous material source terms are related to specific effluent streams that are in turn, related to discharge points and, finally are compared to the effluent monitoring system capability.

  14. NWRS Region 6 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 6, Inventory and Monitoring Program (I present vision and...

  15. Quagga mussel monitoring plan : NDOW Eastern region 2007

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objective detailed in this plan is to intensively monitor Wildhorse Reservoir, South Fork Reservoir and the Ruby Lake NWR for the presence of quagga mussels....

  16. Inventory and Monitoring Plan Big Branch Marsh National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Branch Marsh IMP was developed according to the Inventory and Monitoring (I 1) is an operational plan for one or more refuges that clearly states I 2)...

  17. South Bay Salt Pond Restoration Project : Phase 1 monitoring plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This SBSP Restoration Project Monitoring Plan provides methods to document the effect of restoration on important elements such as mercury uptake, and water and...

  18. Kulm Wetland Management District Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) documents natural resource surveys that will be conducted for Kulm Wetland Management District from 2015 through 2030, or...

  19. Inventory and Monitoring Plan for Morris Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents and prioritizes inventory and monitoring surveys and research currently conducted, and proposed to be conducted at the Morris Wetland Management...

  20. Inventory Monitoring Plan for Pee Dee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Inventory and Monitoring Plan (IMP) is to describe and recommend what natural resource surveys will be conducted at the Pee Dee National Wildlife...

  1. Inventory and Monitoring Plan for Rachel Carson National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents and prioritizes inventory and monitoring surveys and research currently conducted, and proposed to be conducted, at the Rachel Carson National...

  2. NWRS Region 1 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 1, Inventory and Monitoring Program (I present vision and...

  3. Muscatatuck National Wildlife Refuge Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan (IMP) documents the inventory and monitoring surveys that will be conducted at the Muscatatuck National Wildlife Refuge from 2013 through 2028, or until...

  4. Inventory and Monitoring Plan: Carolina Sandhills National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Inventory and Monitoring Plan (IMP) is to describe and recommend what natural resource surveys will be conducted at the Carolina Sandhills NWR...

  5. Inventory and Monitoring Plan for Columbia National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents and prioritizes inventory and monitoring surveys and research currently conducted, and proposed to be conducted, at the Columbia National...

  6. Inventory and Monitoring Plan for Anaho Island National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Inventory and Monitoring Plan (IMP) identifies the surveys that a refuge intends to conduct over the next 15 years and briefly describes the purpose, management...

  7. NWRS Region 3 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 3, Inventory and Monitoring Program (I present vision and...

  8. The Great Dismal Swamp National Wildlife Refuge Contaminants Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Alternatives for an environmental contaminants monitoring plan have been developed for the Great Dismal Swamp National Wildlife Refuge (Refuge). This study...

  9. NWRS Region 2 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 2, Inventory and Monitoring Program (I present vision and...

  10. NWRS Region 8 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  11. NWRS Region 7 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 7, Inventory and Monitoring Program (I present vision and...

  12. NWRS Region 4 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 4, Inventory and Monitoring Program (I present vision and...

  13. Quivira NWR Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The IMP is an operational plan that provides management rationale and logistical considerations of surveys, and is consistent with the station’s Comprehensive...

  14. Facility effluent monitoring plan for the tank farms facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bachand, D.D.; Crummel, G.M.

    1995-05-01

    A facility effluent monitoring plan is required by the US Department of Energy for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using specific guidelines. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years.

  15. Planning and monitoring the execution of web service requests

    NARCIS (Netherlands)

    Lazovik, Alexander; Aiello, Marco; Papazoglou, Mike

    2006-01-01

    Interaction with web services enabled marketplaces would be greatly facilitated if users were given a high level service request language to express their goals in complex business domains. This can be achieved by using a planning framework which monitors the execution of planned goals against prede

  16. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  17. Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Leslie A. [DOE/NNSA

    2004-09-01

    The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

  18. Air Pollution Monitoring | Air Quality Planning & Standards ...

    Science.gov (United States)

    2016-06-08

    The basic mission of the Office of Air Quality Planning and Standards is to preserve and improve the quality of our nation's air. To accomplish this, OAQPS must be able to evaluate the status of the atmosphere as compared to clean air standards and historical information.

  19. 40 CFR 75.53 - Monitoring plan.

    Science.gov (United States)

    2010-07-01

    ...) Information, including (as applicable): identification of the test strategy; protocol for the relative... emission rate, and span; and apportionment strategies under §§ 75.10 through 75.18. (ii) Description of... diagrams showing the dimensions and location of fans, turning vanes, air preheaters, monitor...

  20. Environmental Monitoring Plan: Environmental Monitoring Section. Appendix A, Procedures

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    This document presents information about the environmental monitoring program at Lawrence Livermore National Laboratory. Topics discussed include: air sampling; air tritium calibrations; storm water discharge; non-storm water discharge; sampling locations; ground water sampling; noise and blast forecasting; analytical laboratory auditing; document retention; procedure writing; quality assurance programs for sampling; soil and sediment sampling; sewage sampling; diversion facility tank sampling; vegetation and foodstuff sampling; and radiological dose assessments.

  1. Groundwater Monitoring Plan for the Solid Waste Landfill

    Energy Technology Data Exchange (ETDEWEB)

    JW Lindberg; CJ Chou

    2000-12-14

    The Solid Waste Landfill (SWL) is regulated by the Washington State Department of Ecology under WAC 173-304. Between 1973 and 1976, the landfill received primarily paper waste and construction debris, but it also received asbestos, sewage, and catch tank liquid waste. Groundwater monitoring results indicate the SWL has contaminated groundwater with volatile organic compounds and possibly metals at levels that exceed regulatory limits. DynCorp, Tri-Cities, Inc. operates the facility under an interim closure plan (final closure plan will be released shortly). Pacific Northwest National Laboratory (PNNL) monitors groundwater at the site. This monitoring plan includes well and constituent lists, and summarizes sampling, analytical, and quality control requirements. Changes from the previous monitoring plan include elimination of two radionuclides from the analyte list and some minor changes in the statistical analysis. Existing wells in the current monitoring network only monitor the uppermost portion of the upper-most aquifer. Therefore, two new downgradient wells and one existing upgradient well are proposed to determine whether groundwater waste constituents have reached the lower portion of the uppermost aquifer. The proposed well network includes three upgradient wells and ten downgradient wells. The wells will be sampled quarterly for 14 analytes required by WAC 173-304-490 plus volatile organic compounds and filtered arsenic as site-specific analytes.

  2. Planning aquatic ecosystem restoration monitoring programs

    Energy Technology Data Exchange (ETDEWEB)

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  3. Final work plan : groundwater monitoring at Morrill, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at Morrill, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Morrill being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Morrill.

  4. Final work plan : groundwater monitoring at Centralia, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2005-08-31

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at the site of a former grain storage facility at Centralia, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Centralia being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Centralia.

  5. Facility effluent monitoring plan for the 324 Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    The 324 Facility [Waste Technology Engineering Laboratory] in the 300 Area primarily supports the research and development of radioactive and nonradioactive waste vitrification technologies, biological waste remediation technologies, spent nuclear fuel studies, waste mixing and transport studies, and tritium development programs. All of the above-mentioned programs deal with, and have the potential to, release hazardous and/or radioactive material. The potential for discharge would primarily result from (1) conducting research activities using the hazardous materials, (2) storing radionuclides and hazardous chemicals, and (3) waste accumulation and storage. This report summarizes the airborne and liquid effluents, and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterizing effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

  6. Omaha District Final Cultural Resource Site Monitoring Plan

    Science.gov (United States)

    2014-06-01

    Game , Fish, Parks and Recreation FINAL CULTURAL RESOURCES SITE MONITORING PLAN U.S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT JUNE 2014 Page | 2...to collect routine monitoring data, which is uploaded into CR-DMS. Pathfinder Office is utilized for pre and post processing of data. Detailed...collecting. The data dictionary is created in Pathfinder office and transferred to the unit. The data dictionary is utilized to collect information

  7. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring office responsibility for monitoring plans and reports. 108.20 Section 108.20 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY,...

  8. Epidemiological monitoring plan for geothermal developments.

    Science.gov (United States)

    Deane, M

    1984-01-27

    In order to assure that geothermal developments in the Imperial Valley of California proceeded on an environmentally sound basis, The U.S. Energy Research and Development Administration contracted with the Lawrence Livermore Laboratory to conduct a comprehensive study of six aspects of the region and its potential problems: Air Quality Water Quality, Ecosystem Quality (Soil, Plants, Animals, etc.) Subsidence and Induced Seismicity, Health Effects, and Socio-Economic Effects which may result from the proposed development. This report of the possible health effects is designed to be repeated as geothermal developments progress. It includes both general health attributes and attributes which may be likely to be adversely affected by such developments and is focussed on two different populations, one likely to be affected and a second which is less likely to be affected. Such a design permits the easier identification of possible effects against a background of time-dependent processes in later phases of the study. This baseline study documents that before such developments, there were differences in health status of the two areas, which were chosen to maximize demographic comparability. It further identifies that odor, a possible problem associated with geothermal development, is currently present, and at times intense. Without such baseline monitoring, the likelihood is great that such effects in the future might be falsely ascribed to the geothermal development.

  9. EMP Attachment 3 DOE-SC PNNL Site Dose Assessment Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F.

    2011-12-21

    This Dose Assessment Guidance (DAG) describes methods to use to determine the Maximally-Exposed Individual (MEI) location and to estimate dose impact to that individual under the U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site Environmental Monitoring Plan (EMP). This guidance applies to public dose from radioactive material releases to the air from PNNL Site operations. This document is an attachment to the Pacific Northwest National Laboratory (PNNL) Environmental Monitoring Plan (EMP) and describes dose assessment guidance for radiological air emissions. The impact of radiological air emissions from the U.S. Department of Energy Office of Science (DOE-SC) PNNL Site is indicated by dose estimates to a maximally exposed member of the public, referred to as the maximally exposed individual (MEI). Reporting requirements associated with dose to members of the public from radiological air emissions are in 40 CFR Part 61.94, WAC 246-247-080, and DOE Order 458.1. The DOE Order and state standards for dose from radioactive air emissions are consistent with U.S. Environmental Protection Agency (EPA) dose standards in 40 CFR 61.92 (i.e., 10 mrem/yr to a MEI). Despite the fact that the current Contract Requirements Document (CRD) for the DOE-SC PNNL Site operations does not include the requirement to meet DOE CRD 458.1, paragraph 2.b, public dose limits, the DOE dose limits would be met when EPA limits are met.

  10. Gender Sensitive Planning, Monitoring and Evaluation in Agricultural Water Management

    OpenAIRE

    Gautam, Suman Rimal; Kuriakose, Anne

    2016-01-01

    Agricultural water management projects that take an inclusive, participatory gendersensitive approach at all levels of the project cycle help increase project effectiveness and improve account of livelihood concerns of women and the rural poor. Participatory planning methods; creation of genderspecific indicators; continuous monitoring; and beneficiary-led impact assessment are key features of this approach.

  11. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

  12. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    Energy Technology Data Exchange (ETDEWEB)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad (Iraq Ministry of Science and Technology)

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

  13. Enhancing The National Map Through Tactical Planning and Performance Monitoring

    Science.gov (United States)

    ,

    2008-01-01

    Tactical planning and performance monitoring are initial steps toward improving 'the way The National Map works' and supporting the U.S. Geological Survey (USGS) Science Strategy. This Tactical Performance Planning Summary for The National Map combines information from The National Map 2.0 Tactical Plan and The National Map Performance Milestone Matrix. The National Map 2.0 Tactical Plan is primarily a working document to guide The National Map program's execution, production, and metrics monitoring for fiscal years (FY) 2008 and 2009. The Tactical Plan addresses data, products, and services, as well as supporting and enabling activities. The National Map's 2-year goal for FY 2008 and FY 2009 is to provide a range of geospatial products and services that further the National Spatial Data Infrastructure and underpin USGS science. To do this, the National Geospatial Program will develop a renewed understanding during FY 2008 of key customer needs and requirements, develop the infrastructure to support The National Map business model, modernize its business processes, and reengineer its workforce. Priorities for The National Map will be adjusted if necessary to respond to changes to the project that may impact resources, constrain timeframes, or change customer needs. The supporting and enabling activities that make it possible to produce the products and services of The National Map will include partnership activities, improved compatibility of systems, outreach, and integration of data themes.

  14. Tank monitor and control system (TMACS) software configuration management plan

    Energy Technology Data Exchange (ETDEWEB)

    GLASSCOCK, J.A.

    1999-05-13

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments.

  15. Project Planning, Implementation and Monitoring Issues, Findings and Recommendations

    Directory of Open Access Journals (Sweden)

    Muhammad Salim Javed

    2012-08-01

    Full Text Available The Higher Education Commission (HEC, Pakistan is one of the prestigious institutions of Government of Pakistan. It sets educational policies for all public and private sector universities of Pakistan. The objective of this study is to find institutional problems and issues of a project planning, implementation and monitoring issues. For this purpose, projects data were collected from Project Directors, HEC personnel's and consultants. Data were collected from 150 public and private sector universities and higher learning institution in the regions of Pakistan (i.e., Khyber Pakhtoon Khwa, Punjab, Sindh, Balochistan and Azad Jamu Kashmir using questionnaires. To provide the data, respondents were given the choice of being interviewed or self-administer the questionnaire and send them back to the researcher. After studying and analyzing the data, main problem and issues in project planning, implementation and monitoring issues were identified. In the view of these responses, rPecommendation had been concluded.

  16. Endothelial microparticles (EMP) bind and activate monocytes: elevated EMP-monocyte conjugates in multiple sclerosis.

    Science.gov (United States)

    Jy, Wenche; Minagar, Alireza; Jimenez, Joaquin J; Sheremata, William A; Mauro, Lucia M; Horstman, Lawrence L; Bidot, Carlos; Ahn, Yeon S

    2004-09-01

    Elevated plasma endothelial microparticles (EMP) have been documented in MS during exacerbation. However, the role of EMP in pathogenesis of MS remains unclear. We investigated the formation of EMP-monocyte conjugates (EMP-MoC) and their potential role in transendothelial migration of inflammatory cells in MS. EMP-MoC were assayed in 30 MS patients in exacerbation, 20 in remission and in 35 controls. EMP-leukocyte conjugation was investigated flowcytometrically by employing alpha-CD54 or alpha-CD62E for EMP, and alpha-CD45 for leukocytes. EMP-MoC were characterized by identifying adhesion molecules involved and their effect on monocyte function. In vivo (clinical): EMP-MoC were markedly elevated in exacerbation vs. remission and controls, correlating with presence of GD+ MRI lesions. Free CD54+ EMP were not elevated but free CD62E+ EMP were. In vitro: EMP bound preferentially to monocytes, less to neutrophils, but little to lymphocytes. Bound EMP activated monocytes: CD11b expression increased 50% and migration through cerebral endothelial cell layer increased 2.6-fold. Blockade of CD54 reduced binding by 80%. Most CD54+ EMP bound to monocytes, leaving little free EMP, while CD62+ EMP were found both free and bound. These results demonstrated that phenotypic subsets of EMP interacted differently with monocytes. Based on our observations, EMP may enhance inflammation and increase transendothelial migration of monocytes in MS by binding to and activating monocytes through CD54. EMP-MoC were markedly increased in MS patients in exacerbation compared to remission and may serve as a sensitive marker of MS disease activity.

  17. 2009 review of the Deep Panuke Environmental Effects Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Oceans, Habitat and Species at Risk branch of the Department of Fisheries and Oceans Canada requested an update to the Environmental Management Plan for the construction of the Deep Panuke Project. Specifically, it requested expert advice on the 2009-2010 Drilling Environmental Protection Plan/Environmental Effects Monitoring Plan (EPP/EEMP), which outlines the measures that EnCana proposes take to avoid or minimize the effects of drilling in the marine environment. Although the proposed approach was deemed to be sufficient, the EPP/EEMP did not make reference to the potential effects of noise on marine species. The jack-up rig mobile offshore production unit that is proposed for well drilling and well re-entries was considered to produce lower noise levels than drillships and semi submersibles. It was concluded that jack up drilling at Deep Panuke would not likely require special noise mitigation measures, but more extensive measurement and documentation of acoustic noise levels around active rigs is recommended. The risk of well blowout or collapse was deemed low. Should such an event occur, the impact of the released hydrocarbon condensate would depend on the rate and duration of the release. Under typical conditions, the proponent's models reasonably show the blowout discharge drifting away from Sable Island. However, there is a very low risk that certain weather conditions would result in an oil spill reaching Sable Island. The EPP/EEMP does not address species at risk in any way, and mitigation measures are required and should be detailed in the monitoring plan. It was concluded that the proposed EPP/EEMP is sufficient in many areas, but since most mitigation measures are based on theoretical considerations alone, a plan for field monitoring at the drilling site is needed. 3 refs.

  18. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Science.gov (United States)

    2010-04-13

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring Requirements for Indianapolis Power and Light--Harding Street Station AGENCY: Environmental... State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light...

  19. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities.

  20. Facility Effluent Monitoring Plan for the 3720 Building

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the Environmental Science Laboratory (3720 Facility) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs'' This FEMP has been prepared for the 3720 Facility primarily because it has a major (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The 3720 Facility provides office and laboratory space for PNNL scientific and engineering staff conducting multidisciplinary research in the areas of materials characterization and testing and waste management. The facility is designed to accommodate the use of radioactive and hazardous materials to conduct these activities. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, and dispersible particulate. The facility is in the process of being vacated for shutdown, but is considered a Major Emission Point as of the date of this document approval.

  1. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) of riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.

  2. Facility effluent monitoring plan for the 325 Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The Applied Chemistry Laboratory (325 Facility) houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and mixed hazardous waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials, and a waste treatment facility for processing hazardous, mixed, low-level, and transuranic wastes generated by Pacific Northwest Laboratory. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, particulate, and gas. Some of these materials are also heated during testing which can produce vapors. The research activities have been assigned to the following activity designations: High-Level Hot Cell, Hazardous Waste Treatment Unit, Waste Form Development, Special Testing Projects, Chemical Process Development, Analytical Hot Cell, and Analytical Chemistry. The following summarizes the airborne and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

  3. Implementing network constraints in the EMPS model

    Energy Technology Data Exchange (ETDEWEB)

    Helseth, Arild; Warland, Geir; Mo, Birger; Fosso, Olav B.

    2010-02-15

    This report concerns the coupling of detailed market and network models for long-term hydro-thermal scheduling. Currently, the EPF model (Samlast) is the only tool available for this task for actors in the Nordic market. A new prototype for solving the coupled market and network problem has been developed. The prototype is based on the EMPS model (Samkjoeringsmodellen). Results from the market model are distributed to a detailed network model, where a DC load flow detects if there are overloads on monitored lines or intersections. In case of overloads, network constraints are generated and added to the market problem. Theoretical and implementation details for the new prototype are elaborated in this report. The performance of the prototype is tested against the EPF model on a 20-area Nordic dataset. (Author)

  4. Monitoring and evaluation plan for the Nez Perce Tribal Hatchery

    Energy Technology Data Exchange (ETDEWEB)

    Steward, C.R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan, the 1995 Supplement to the Master Plan, and the Nez Perce Tribal Hatchery Program Environmental Impact Statement. The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts.

  5. Epson EMP-S1投影机的升级产品EMP-S1H

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    EMP-S1是Epson公司推出的1款颇具影响力的经济型投影机,2004年5月Epson推出了EMP-S1的升级产品EMP-S1H。EMP.S1H在原有EMP-S1投影机的基础上亮度提高到了1400流明,同时对比度也提高到500:1,对比度的提高使图像层次感更好,影像更富有质感。

  6. Water-Level Monitoring Plan for the Hanford Groundwater Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    D.R. Newcomer; J.P. McDonald; M.A. Chamness

    1999-09-30

    This document presents the water-level monitoring plan for the Hanford Groundwater Monitoring Project, conducted by the Pacific Northwest National Laboratory (PNNL). Water-level monitoring of the groundwater system beneath the Hanford Site is performed to fulfill the requirements of various state and federal regulations, orders, and agreements. The primary objective of this monitoring is to determine groundwater flow rates and directions. To meet this and other objectives, water-levels are measured annually in monitoring wells completed within the unconfined aquifer system, the upper basalt-confined aquifer system, and in the lower basalt-confined aquifers for surveillance monitoring. At regulated waste units, water levels are taken monthly, quarterly, semi-annually, or annually, depending on the hydrogeologic conditions and regulatory status of a given site. The techniques used to collect water-level data are described in this document along with the factors that affect the quality of the data and the strategies employed by the project to minimize error in the measurement and interpretation of water levels. Well networks are presented for monitoring the unconfined aquifer system, the upper basalt-confined aquifer system, and the lower basalt-confined aquifers, all at a regional scale (surveillance monitoring), as well as the local-scale well networks for each of the regulated waste units studied by this project (regulated-unit monitoring). The criteria used to select wells for water-table monitoring are discussed. It is observed that poor well coverage for surveillance water-table monitoring exists south and west of the 200-West Area, south of the 100-F Area, and east of B Pond and the Treated Effluent Disposal Facility (TEDF). This poor coverage results from a lack of wells suitable for water-table monitoring, and causes uncertainty in representation of the regional water-table in these areas. These deficiencies are regional in scale and apply to regions outside

  7. Cycle Monitors and Devices in Natural Family Planning

    Directory of Open Access Journals (Sweden)

    Freundl G

    2010-01-01

    Full Text Available For fertility awareness based methods- (FAB- users charting and checking of menstrual cycle symptoms may be supported by different instruments and devices. These cycle monitors promise to detect the fertile and infertile days by using direct and indirect markers of fertility in a woman´s menstrual cycle. In this article we use data of our own studies, data out of the literature research in Medline and PubMed and from our own German NFP (natural family planning database. We tried to rate the efficacy of the tested monitors. We figured out that only for one hormone- and for one temperature-computer reasonable prospective studies exist. To get more comparable results we have performed in 2000 a small pilot study on 6 devices and the symptothermal method of NFP (NFP-DAG together with “Stiftung Warentest”. The efficacy of the various devices differed significantly. We therefore urgently need more clinical studies on menstrual cycle monitors for reliable information of users.

  8. Savannah River Site Environmental Monitoring Plan. Volume 1, Section 1000 Addendum: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Jannik, G.T.

    1994-10-01

    This document -- the Savannah River Site Environmental Monitoring Plan (SRS EM Plan) -- has been prepared according to guidance contained in the DOE 5400 Series orders, in 10 CFR 834, and in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and environmental Surveillance [DOE, 1991]. The SRS EM Plan`s purpose is to define the criteria, regulations, and guideline requirements with which SRS will comply. These criteria and requirements are applicable to environmental monitoring activities performed in support of the SRS Environmental Monitoring Program (SRS EM Program), WSRC-3Q1-2, Volume 1, Section 1100. They are not applicable to monitoring activities utilized exclusively for process monitoring/control. The environmental monitoring program requirements documented in the SRS EM Plan incorporate all applicable should requirements of DOE/EH-0173T and expand upon them to include nonradiological environmental monitoring program requirements.

  9. Plan for a groundwater monitoring network in Taiwan

    Science.gov (United States)

    Hsu, Shiang-Kueen

    In Taiwan, rapid economic growth, rising standards of living, and an altered societal structure have in recent years put severe demands on water supplies. Because of its stable quantity and quality, groundwater has long been a reliable source of water for domestic, agricultural, and industrial users, but the establishment of a management program that integrates groundwater and surface-water use has been hampered by the lack of groundwater data. In 1992, the Department of Water Resources (DWR) initiated a program entitled "Groundwater Monitoring Network Plan in Taiwan." Under this program, basic groundwater data, including water-level and water-quality data, are being collected, and a reliable database is being established for the purpose of managing total water resources. This paper introduces the goals, implementation stages, and scope of that plan. The plan calls for constructing 517 hydrogeologic survey stations and 990 groundwater monitoring wells within 17 years. Under this program, water-level fluctuations are continuously monitored, whereas water-quality samples are taken for analysis only at the initial drilling stage and, subsequently, at the time when a monitoring well is being serviced. In 1996, the DWR and the Water Resources Planning Commission were merged to form today's Water Resources Bureau. Résumé A Taïwan, l'expansion économique rapide, l'amélioration des conditions de vie et la transformation de la structure sociale ont provoqué, ces dernières années, une très forte demande en eau. Du fait de sa constance en qualité et en quantité, l'eau souterraine a longtemps été considérée comme une ressource en eau sûre pour les usages domestiques, agricoles et industriels. Mais la mise en place d'un programme de gestion intégrant les utilisations d'eaux souterraines et de surface a été gênée par l'absence de données sur les eaux souterraines. En 1992, le Département des Ressources en Eau a lancé le programme "Plan pour un réseau de

  10. Samnett: the EMPS model with power flow constraints: implementation details

    Energy Technology Data Exchange (ETDEWEB)

    Helseth, Arild; Warland, Geir; Mo, Birger; Fosso, Olav B.

    2011-12-15

    This report describes the development and implementation of Samnett. Samnett is a new prototype for solving the coupled market and transmission network problem. The prototype is based on the EMPS model (Samkjoeringsmodellen). Results from the market model are distributed to a detailed transmission network model, where a DC power flow detects if there are overloads on monitored lines or interconnections. In case of overloads, power flow constraints are generated and added to the market problem. This report is an updated version of TR A6891 {sup I}mplementing Network Constraints in the EMPS model{sup .} It further elaborates on theoretical and implementation details in Samnett, but does not contain the case studies and file descriptions presented in TR A6891.(auth)

  11. Great River & Clarence Cannon National Wildlife Refuges Inventory and Monitoring Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan for Clarence Cannon and Great River National Wildlife Refuges is a step-down from the Habitat Management Plan (HMP) and documents...

  12. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    Science.gov (United States)

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  13. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    Science.gov (United States)

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  14. Final Restoration and Mitigation Monitoring Plan for the Island Ponds Restoration Project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Restoration and Mitigation Monitoring Plan (RMMP) presents the approaches necessary to satisfy mitigation and monitoring requirements described in the various...

  15. 76 FR 16795 - The National Antimicrobial Resistance Monitoring System Strategic Plan 2011-2015; Request for...

    Science.gov (United States)

    2011-03-25

    ... HUMAN SERVICES Food and Drug Administration The National Antimicrobial Resistance Monitoring System... National Antimicrobial Resistance Monitoring System (NARMS) entitled ``NARMS Strategic Plan 2011-2015... obtain documents at either http://www.fda.gov/AnimalVeterinary/SafetyHealth/AntimicrobialResistance...

  16. [Endothelial microparticles (EMP) in physiology and pathology].

    Science.gov (United States)

    Sierko, Ewa; Sokół, Monika; Wojtukiewicz, Marek Z

    2015-08-18

    Endothelial microparticles (EMP) are released from endothelial cells (ECs) in the process of activation and/or apoptosis. They harbor adhesive molecules, enzymes, receptors and cytoplasmic structures and express a wide range of various constitutive antigens, typical for ECs, at their surface. Under physiological conditions the concentration of EMP in the blood is clinically insignificant. However, it was reported that under pathological conditions EMP concentration in the blood might slightly increase and contribute to blood coagulation, angiogenesis and inflammation. It has been shown that EMP directly and indirectly contribute to the activation of blood coagulation. Endothelial microparticles directly participate in blood coagulation through their surface tissue factor (TF) - a major initiator of blood coagulation. Furthermore, EMP exhibit procoagulant potential via expression of negatively charged phospholipids at their surface, which may promote assembly of coagulation enzymes (TF/VII, tenases and prothrombinase complexes), leading to thrombus formation. In addition, they provide a binding surface for coagulation factors: IXa, VIII, Va and IIa. Moreover, it is possible that EMP transfer TF from TF-bearing EMP to activated platelets and monocytes by binding them through adhesion molecules. Also, EMP express von Willebrand factor, which may facilitate platelet aggregation. Apart from their procoagulant properties, it was demonstrated that EMP may express adhesive molecules and metalloproteinases (MMP-2, MMP-9) at their surface and release growth factors, which may contribute to angiogenesis. Additionally, surface presence of C3 and C4 - components of the classical pathway - suggests pro-inflammatory properties of these structures. This article contains a summary of available data on the biology and pathophysiology of endothelial microparticles and their potential role in blood coagulation, angiogenesis and inflammation.

  17. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

  18. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

  19. observaciones empíricas

    Directory of Open Access Journals (Sweden)

    Beatriz González Vázquez

    2007-01-01

    Full Text Available En el desarrollo y éxito de los espacios innovadores las relaciones entre los agentes integrantes de los mismos resultan esenciales. En este artículo se analizan las redes de relaciones en varias áreas tecnológicas, con el objetivo de comprobar si existe un mismo modelo en todas ellas. La red en dichos espacios se estudia tanto desde una perspectiva reticular, apoyándose en los atributos de las empresas y en las variables relacionales extraídas de los flujos entre las mismas, como desde la búsqueda de un modelo cuantitativo explicativo. El análisis empírico se realiza en las redes de tres Parques Tecnológicos, y de los resultados se extrae que la morfología de la red está influenciada por la estrategia de crecimiento que haya mantenido la dirección del parque en función de las condiciones industriales de su área geográfica. El análisis cuantitativo confirma el modelo centro-periferia observado en las redes.

  20. Hierarchical Bayesian spatial models for multispecies conservation planning and monitoring.

    Science.gov (United States)

    Carroll, Carlos; Johnson, Devin S; Dunk, Jeffrey R; Zielinski, William J

    2010-12-01

    Biologists who develop and apply habitat models are often familiar with the statistical challenges posed by their data's spatial structure but are unsure of whether the use of complex spatial models will increase the utility of model results in planning. We compared the relative performance of nonspatial and hierarchical Bayesian spatial models for three vertebrate and invertebrate taxa of conservation concern (Church's sideband snails [Monadenia churchi], red tree voles [Arborimus longicaudus], and Pacific fishers [Martes pennanti pacifica]) that provide examples of a range of distributional extents and dispersal abilities. We used presence-absence data derived from regional monitoring programs to develop models with both landscape and site-level environmental covariates. We used Markov chain Monte Carlo algorithms and a conditional autoregressive or intrinsic conditional autoregressive model framework to fit spatial models. The fit of Bayesian spatial models was between 35 and 55% better than the fit of nonspatial analogue models. Bayesian spatial models outperformed analogous models developed with maximum entropy (Maxent) methods. Although the best spatial and nonspatial models included similar environmental variables, spatial models provided estimates of residual spatial effects that suggested how ecological processes might structure distribution patterns. Spatial models built from presence-absence data improved fit most for localized endemic species with ranges constrained by poorly known biogeographic factors and for widely distributed species suspected to be strongly affected by unmeasured environmental variables or population processes. By treating spatial effects as a variable of interest rather than a nuisance, hierarchical Bayesian spatial models, especially when they are based on a common broad-scale spatial lattice (here the national Forest Inventory and Analysis grid of 24 km(2) hexagons), can increase the relevance of habitat models to multispecies

  1. 75 FR 18757 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Science.gov (United States)

    2010-04-13

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring Requirements for Indianapolis Power and Light--Harding Street Station AGENCY: Environmental... approve as ] a revision to its State Implementation Plan (SIP) alternative monitoring requirements for...

  2. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  3. STRATEGY AND PLANNING - PROJECT FOR MONITORING STRICTO SENSU POSTGRADUATE ALUMNI

    Directory of Open Access Journals (Sweden)

    Emerson Antonio Maccari

    2014-07-01

    Full Text Available The Coordination of Improvement of Higher Education Personnel (CAPES has been contributing to the development of post-graduate studies in Brazil, through its system of evaluation. Lately, CAPES signaled the importance of follow the professional performance of the alumni as a way to measure the quality of courses. One difficulty reported by institutions that intend to recognize the trajectory of its graduates is to compile a lot of isolated and outdated data. In order to structure the data collection and to assist educational managers in decision making, we propose the development of a system that enables the evolution of the students and alumni professional career, in order to diagnose the influence of the courses. Based on literature review, this study presents an analysis and makes recommendations about the Monitoring Alumni Project planning. As a result, it is expected that the analysis will serve as a driver for conducting the project, aiming to contribute to the academic reflections, and in practice, contribute to improve educational projects quality.

  4. Monitoring Teams by Overhearing: A Multi-Agent Plan-Recognition Approach

    CERN Document Server

    Kaminka, G A; Tambe, M; 10.1613/jair.970

    2011-01-01

    Recent years are seeing an increasing need for on-line monitoring of teams of cooperating agents, e.g., for visualization, or performance tracking. However, in monitoring deployed teams, we often cannot rely on the agents to always communicate their state to the monitoring system. This paper presents a non-intrusive approach to monitoring by 'overhearing', where the monitored team's state is inferred (via plan-recognition) from team-members' routine communications, exchanged as part of their coordinated task execution, and observed (overheard) by the monitoring system. Key challenges in this approach include the demanding run-time requirements of monitoring, the scarceness of observations (increasing monitoring uncertainty), and the need to scale-up monitoring to address potentially large teams. To address these, we present a set of complementary novel techniques, exploiting knowledge of the social structures and procedures in the monitored team: (i) an efficient probabilistic plan-recognition algorithm, well...

  5. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Lohrasbi, J.; Johnson, D.L. [Westinghouse Hanford Co., Richland, WA (United States); De Lorenzo, D.S. [Los Alamos Technical Associates, NM (United States)

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  6. Final monitoring plan for site restoration at Murdock, Nebraska.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2006-02-28

    In early 2005, Argonne National Laboratory conducted an Engineering Evaluation/Cost Analysis (EE/CA; Argonne 2005b) to address carbon tetrachloride contamination identified in groundwater and surface water at Murdock, Nebraska, approximately 22 mi east-northeast of Lincoln (Figure 1.1). The EE/CA study was performed for the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA), as the technical basis for a proposed removal action for the Murdock site. The EE/CA was conducted in compliance with an Administrative Order on Consent issued for Murdock by the U.S. Environmental Protection Agency (EPA 1991). Three removal action alternatives were examined through the use of site-specific data and predictive simulations of groundwater flow and contaminant transport performed with calibrated numerical models. The alternatives were evaluated individually and compared against performance criteria established under the National Oil and Hazardous Substances Pollution Contingency Plan and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). On the basis of these evaluations, an alternative employing phytoremediation in conjunction with seasonal groundwater extraction and treatment by spray irrigation was recommended by the CCC/USDA to permanently reduce the carbon tetrachloride contaminant levels in groundwater and surface water at the site. The proposed alternative is being implemented in cooperation with the EPA. Under the direction of the CCC/USDA and the EPA, implementation of the chosen removal action occurred in phases, beginning in April 2005. Installation of all the required remediation systems was completed by the end of August 2005. Specific technical objectives of the removal action are as follows: (1) To eliminate pathways for potential human exposure to carbon tetrachloride concentrations above the regulatory limit of 44.2 {micro}g/L in surface water at the site. (2) To minimize or eliminate any detrimental

  7. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  8. The relationship between various exposure metrics for elongate mineral particles (EMP) in the taconite mining and processing industry.

    Science.gov (United States)

    Hwang, Jooyeon; Ramachandran, Gurumurthy; Raynor, Peter C; Alexander, Bruce H; Mandel, Jeffrey H

    2014-01-01

    Different dimensions of elongate mineral particles (EMP) have been proposed as being relevant to respiratory health end-points such as mesothelioma and lung cancer. In this article, a methodology for converting personal EMP exposures measured using the National Institute for Occupational Safety and Health (NIOSH) 7400/7402 methods to exposures based on other size-based definitions has been proposed and illustrated. Area monitoring for EMP in the taconite mines in Minnesota's Mesabi Iron Range was conducted using a Micro Orifice Uniform Deposit Impactor (MOUDI) size-fractionating sampler. EMP on stages of the MOUDI were counted and sized according to each EMP definition using an indirect-transfer transmission electron microscopy (ISO Method 13794). EMP were identified using energy-dispersive x-ray and electron diffraction analysis. Conversion factors between the EMP counts based on different definitions were estimated using (1) a linear regression model across all locations and (2) a location-specific ratio of the count based on each EMP definition to the NIOSH 7400/7402 count. The highest fractions of EMP concentrations were found for EMP that were 1-3 μm in length and 0.2-0.5 μm in width. Therefore, the current standard NIOSH Method 7400, which only counts EMP >5 μm in length and ≥ 3 in aspect ratio, may underestimate amphibole EMP exposures. At the same time, there was a high degree of correlation between the exposures estimated according to the different size-based metrics. Therefore, the various dimensional definitions probably do not result in different dose-response relationships in epidemiological analyses. Given the high degree of correlation between the various metrics, a result consistent with prior research, a more reasonable metric might be the measurement of all EMP irrespective of size. [Supplementary materials are available for this article. Go to the publisher's online edition of Journal of Occupational and Environmental Hygiene for the

  9. An inventory and monitoring plan for a Sonoran Desert ecosystem; Barry M. Goldwater Range-West

    Science.gov (United States)

    Villarreal, Miguel L.; van Riper, Charles; Lovich, Robert E.; Palmer, Robert L.; Nauman, Travis; Studd, Sarah E.; Drake, Sam; Rosenberg, Abigail S.; Malusa, Jim; Pearce, Ronald L.

    2011-01-01

    Marine Corps Air Station Yuma manages the Barry M. Goldwater Range-West, which encompasses approximately 2,800 square kilometers of Sonoran Desert habitat in southwestern Arizona. The Barry M. Goldwater Range is a major U.S. military installation designed as an air combat training location for the U.S. Marine Corps and U.S. Air Force, but it also includes some of the most pristine desert habitat in the United States. In an effort to ensure the long-term viability of this unique natural resource, the U.S. Geological Survey (USGS) has developed an Integrated Natural Resources Management Plan and Inventory and Monitoring Plan to guide natural resource management of the Barry M. Goldwater Range-West. This Inventory and Monitoring Plan provides a framework for long-term ecosystem monitoring on Barry M. Goldwater Range-West lands by identifying existing and potential threats to ecosystem function, prioritizing resources for monitoring, and providing information and protocols necessary to initiate a long-term ecosystem monitoring program. The Inventory and Monitoring Plan and related protocols were developed through extensive review of existing Sonoran Desert monitoring programs and monitoring literature and through a 2-day workshop with resource managers, monitoring experts, and other stakeholders. The Barry M. Goldwater Range-West Inventory and Monitoring Plan stresses the importance of regional monitoring partnerships and protocol standardization for understanding landscape-scale ecosystem changes in the Sonoran Desert; information and protocols contained within the plan may also be of interest to land managers engaged in large-scale ecosystem monitoring and adaptive management of other arid regions.

  10. 爱普生EMP-TW2000

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    爱普生EMP-TW2000是爱普生家用投影机中规格最高的一款产品。它具有1600流明的高亮度,两组HDMI接口。EMP-TW2000采用爱普生最新研发的0.74英寸C2Fine技术的D6液晶面板,C2 FINE技术中独有的VA(垂直取向)模式,能大幅度地减少光泄漏,

  11. Quality assurance program plan for radionuclide airborne emissions monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements.

  12. Environmental Contaminants Monitoring Plan for Stillwater National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This environmental contaminants monitoring program is designed to assess concentrations, distribution, and biological availability of environmental contaminants on...

  13. Y-12 Groundwater Protection Program Monitoring Well Inspection And Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for:  inspecting the physical condition of monitoring wells at Y-12,  determining maintenance needs that extend the life of a well, and  identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment.

  14. Y-12 Groundwater Protection Program Monitoring Well Inspection And Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for:  inspecting the physical condition of monitoring wells at Y-12,  determining maintenance needs that extend the life of a well, and  identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment.

  15. Monitoring well plugging and abandonment plan, Y-12 Plant, Oak Ridge, Tennessee (revised)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Plugging and abandonment (P&A) of defunct groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP) (AJA Technical Services, Inc. 1996). This document is the revised groundwater monitoring well P&A plan for the U.S. Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan describes the systematic approach employed by Y-12 Plant GWPP to identify wells that require P&A, the technical methods employed to perform P&A activities, and administrative requirements. Original documentation for Y-12 Plant GWPP groundwater monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A schedule be maintained. Wells are added to this list by issuance of both a P&A request and a P&A addendum to the schedule. The current Updated Subsurface Data Base includes a single mechanism to track the status of monitoring wells. In addition, rapid growth of the groundwater monitoring network and new regulatory requirements have resulted in constant changes to the status of wells. As a result, a streamlined mechanism to identify and track monitoring wells scheduled for P&A has been developed and the plan revised to formalize the new business practices.

  16. Inventory and Monitoring 7-Year Plan: 2013-2020 For the National Wildlife Refuge System

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring 7-Year Plan outlines how the National Wildlife Refuge System is implementing a nationally coordinated effort to support rigorous...

  17. Groundwater monitoring plan for the proposed state-approved land disposal structure

    Energy Technology Data Exchange (ETDEWEB)

    Reidel, S.P.

    1993-10-13

    This document outlines a detection-level groundwater monitoring program for the state-approved land disposal structure (SALDS). The SALDS is an infiltration basin proposed for disposal of treated effluent from the 200 Areas of the Hanford Site. The purpose of this plan is to present a groundwater monitoring program that is capable of determining the impact of effluent disposal at the SALDS on the quality of groundwater in the uppermost aquifer. This groundwater monitoring plan presents an overview of the SALDS, the geology and hydrology of the area, the background and indicator evaluation (detection) groundwater monitoring program, and an outline of a groundwater quality assessment (compliance) program. This plan does not provide a plan for institutional controls to track tritium beyond the SALDS.

  18. National Wildlife Refuge System Region 7 Inventory and Monitoring Regional Annual Work Plan Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 7 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  19. Region 1 National Wildlife Refuge System Inventory and Monitoring Program : Annual Work Plan : Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 1 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  20. Inventory and Monitoring Plan for Little Pend Oreille National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents and prioritizes inventory and monitoring surveys and research currently conducted, and proposed to be conducted, at the Little Pend Oreille...

  1. Pacific Southwest Region Inventory & Monitoring Initiative: Annual Work Plan FY 2013

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  2. Pacific Southwest Region Inventory & Monitoring Initiative: Annual Work Plan FY 2014

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  3. Pacific Southwest Region Inventory & Monitoring Initiative: Annual Work Plan FY 2015

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  4. Pacific Southwest Region Inventory & Monitoring Initiative: Annual Work Plan FY 2016

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  5. Natural Resource Program Center Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the National Wildlife Refuge System I present vision and objectives for regional inventory and monitoring initiative, staffing, planned activities and...

  6. Inventory and Monitoring Plan for Kanuti National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This IMP provides the rationale for the ranking and selection of surveys that Kanuti NWR intends to conduct over the life of the plan (about 10 years), and briefly...

  7. Facility Effluent Monitoring Plan for the Waste Receiving and Processing (WRAP) Facility

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, W.E.

    2000-03-08

    A facility effluent monitoring plan is required by the U.S. Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee public safety, or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan ensures long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and must be updated, as a minimum, every 3 years.

  8. Lightning driven EMP in the upper atmosphere

    Science.gov (United States)

    Rowland, H. L.; Fernsler, R. F.; Huba, J. D.; Bernhardt, P. A.

    1995-01-01

    Large lightning discharges can drive electromagnetic pulses (EMP) that cause breakdown of the neutral atmosphere between 80 and 95 km leading to order of magnitude increases in the plasma density. The increase in the plasma density leads to increased reflection and absorption, and limits the pulse strength that propagates higher into the ionosphere.

  9. Alaska Regional Refuge Inventory and Monitoring Strategic Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Alaska Inventory and Monitoring team (I Message-ID: ). Alaska Region I&M Team members: Anna-Marie Benson , Greta Burkart , McCrea Cobb , Carol Damberg ,...

  10. sampling plans for monitoring quality control process at a plastic ...

    African Journals Online (AJOL)

    Dr Obe

    managing these -activities in an intercultural environment will be of increasing ... adoption of new managerial concepts and .techniques among ... sample for both monitoring and quality control purposes. Prybrutok, et al. 7 observed that the.

  11. A plan for the North American Bat Monitoring Program (NABat)

    Science.gov (United States)

    Loeb, Susan C.; Rodhouse, Thomas J.; Ellison, Laura E.; Lausen, Cori L.; Reichard, Jonathan D.; Irvine, Kathryn M.; Ingersoll, Thomas E.; Coleman, Jeremy; Thogmartin, Wayne E.; Sauer, John R.; Francis, Charles M.; Bayless, Mylea L.; Stanley, Thomas R.; Johnson, Douglas H.

    2015-01-01

    The purpose of the North American Bat Monitoring Program (NABat) is to create a continent-wide program to monitor bats at local to rangewide scales that will provide reliable data to promote effective conservation decisionmaking and the long-term viability of bat populations across the continent. This is an international, multiagency program. Four approaches will be used to gather monitoring data to assess changes in bat distributions and abundances: winter hibernaculum counts, maternity colony counts, mobile acoustic surveys along road transects, and acoustic surveys at stationary points. These monitoring approaches are described along with methods for identifying species recorded by acoustic detectors. Other chapters describe the sampling design, the database management system (Bat Population Database), and statistical approaches that can be used to analyze data collected through this program.

  12. Inventory and Monitoring Plan for Yukon Flats National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This IMP prioritizes and describes the inventory, monitoring, and research surveys to be conducted on the Yukon Flats NWR over the next 10 years, based on guidance...

  13. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans.

  14. 77 FR 40860 - Strategic Plan for Federal Research and Monitoring of Ocean Acidification

    Science.gov (United States)

    2012-07-11

    ... Monitoring of Ocean Acidification AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and... Ocean Acidification is being made available for public review and comment. The Draft Research Plan... section 12405 of the Federal Ocean Acidification Research And Monitoring Act of 2009, 33 U.S.C. 3701-3708...

  15. Monitoring well inspection and maintenance plan Y-12 Plant, Oak Ridge, Tennessee (revised)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Inspection and maintenance of groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP). This document is the revised groundwater monitoring well inspection and maintenance plan for the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The plan provides a systematic program for: (1) inspecting the physical condition of monitoring wells at the Y-12 Plant and (2) identifying maintenance needs that will extend the life of each well and ensure that representative groundwater quality samples and hydrologic data are collected from the wells. Original documentation for the Y-12 Plant GWPP monitoring well inspection and maintenance program was provided in HSW, Inc. 1991a. The original revision of the plan specified that only a Monitoring Well Inspection/Maintenance Summary need be updated and reissued each year. Rapid growth of the monitoring well network and changing regulatory requirements have resulted in constant changes to the status of wells (active or inactive) listed on the Monitoring Well Inspection/Maintenance Summary. As a result, a new mechanism to track the status of monitoring wells has been developed and the plan revised to formalize the new business practices. These changes are detailed in Sections 2.4 and 2.5.

  16. Assessment groundwater monitoring plan for single shell tank waste management area B-BX-BY

    Energy Technology Data Exchange (ETDEWEB)

    Caggiano, J.A.

    1996-09-27

    Single Shell Tank Waste Management Area B-BX-BY has been placed into groundwater quality assessment monitoring under interim-status regulations. This document presents background and an assessment groundwater monitoring plan to evaluate any impacts of risks/spills from these Single Shell Tanks in WMA B-BX-BY on groundwater quality.

  17. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  18. Requirement for erythroblast-macrophage protein (Emp) in definitive erythropoiesis.

    Science.gov (United States)

    Soni, Shivani; Bala, Shashi; Hanspal, Manjit

    2008-01-01

    Emp, erythroblast-macrophage protein was initially identified as a mediator of erythroblast-macrophage interactions during erythroid differentiation. More recent studies have shown that targeted disruption of Emp leads to abnormal erythropoiesis in the fetal liver, and fetal demise. To further address the activity of Emp in the hematopoietic lineage in adult bone marrow, we conducted fetal liver HSC reconstitution assay. Emp null fetal liver cells were transplanted into lethally irradiated wild-type sibling mice, and assessed the erythropoietic activity. We found that Emp null cells rescued lethally irradiated mice with efficiency comparable to that of wild-type cells. However, the recipients of Emp null cells showed abnormal erythropoiesis as indicated by the presence of persistent anemia, extensive extramedullary erythropoiesis, and increased apoptosis of erythroid precursors. Extramedullary erythropoiesis suggests perturbed interactions between the Emp-deficient hematopoietic cells and the wild-type niche. Furthermore, in spleen colony-forming unit assays, proliferation rates of the Emp null cells were greater than those of the wild-type cells. Similarly, in vitro burst-forming unit-erythroid and colony-forming unit-erythroid assays showed increased erythroid colony numbers from Emp null livers. Morphologic examination showed that Emp null CFU-E-derived erythroblasts were immature compared to those derived from wild-type CFU-Es, suggesting that loss of Emp function in erythroid cells results in impaired proliferation and terminal differentiation. These results demonstrate that Emp plays a cell intrinsic role in the erythroid lineage.

  19. Interim Status Groundwater Monitoring Plan for Low-Level Waste Management Areas 1 to 4, RCRA Facilities, Hanford,Washington

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P Evan

    2004-10-25

    This document describes the monitoring plan to meet the requirements for interim status groundwater monitoring at Hanford Site low-level waste burial grounds as specified by 40 CFR 265, incorporated by reference in WAC 173-303-400. The monitoring will take place at four separate low-level waste management areas in the 200-West and 200-East Areas, in the central part of the site. This plan replaces the previous monitoring plan.

  20. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    Energy Technology Data Exchange (ETDEWEB)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

  1. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    Energy Technology Data Exchange (ETDEWEB)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

  2. Standard Guide for Environmental Monitoring Plans for Decommissioning of Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide covers the development or assessment of environmental monitoring plans for decommissioning nuclear facilities. This guide addresses: (1) development of an environmental baseline prior to commencement of decommissioning activities; (2) determination of release paths from site activities and their associated exposure pathways in the environment; and (3) selection of appropriate sampling locations and media to ensure that all exposure pathways in the environment are monitored appropriately. This guide also addresses the interfaces between the environmental monitoring plan and other planning documents for site decommissioning, such as radiation protection, site characterization, and waste management plans, and federal, state, and local environmental protection laws and guidance. This guide is applicable up to the point of completing D&D activities and the reuse of the facility or area for other purposes.

  3. 更亮更美更平价投影机——Epson EMP-S1H/EMP-TW10H

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    Epson最新推出的两都家用入门级投影机——EMP-S1H及EMP-TW10H,都是上一代EMP-S1和EMP-TW10的加强版.同时加强了显示的亮度与对比度。奠中.EMP-S1H拥有较亮的1,400流明亮度及500:1的对比度;而EMP-TW10H则拥有鞍高显示品质的1,200流明及800:1对比度。而最重要的.就是两机分别都比上一

  4. 更亮更美更平价投影机 Epson EMP-S1H / EMP-TW10H

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    Epson最新推出的两部家用入门级投影机——EMP-SIH及EMP-TW10H,都是一代EMP-S1和EMP-TW10的加强版,同时加强了显示的亮度与对比度,其中,EMP-S1H拥有较高的1.400流明亮度及500:1的对比度;而EMP-TW10H则拥有较高显示器质的1.200流明及800:1对比度。而最重要的,就是两机分别都比上一

  5. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-12-01

    This document is the third revision of the 'Monitoring Well Inspection and Maintenance Plan' for groundwater wells associated with the US Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: (1) inspecting the physical condition of monitoring wells at Y-12; (2) identifying maintenance needs that extend the life of the well and assure well-head protection is in place, and (3) identifying wells that no longer meet acceptable monitoring-well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, 'proactive stewardship of the extensive monitoring well network at Y-12' (BWXT 2004a). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality monitoring and hydrologic data are able to be obtained from the well network. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (BWXT 2006b), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data. This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime); (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime); and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of the

  6. 1996 monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites was near the town of Gunnison, Colorado. Surface remediation was completed at the Gunnison site in December 1995. Remedial action resulted in the elimination of 4.3 acres of wetlands and mitigation of this loss is through the enhancement of 17.8 acres of riparian plant communities in six spring-fed areas on US Bureau of Land Management mitigation sites. A five-year monitoring program was then implemented to document the response of vegetation and wildlife to the exclusion of livestock. This report provides the results of the third year of the monitoring program.

  7. Defense Coastal/Estuarine Research Program (DCERP) Baseline Monitoring Plan

    Science.gov (United States)

    2007-09-19

    species, such as the seabeach amaranth , may even be enhanced by such perturbations. The dune and shrub plants of the coastal barrier suffer...sampling and modeling to determine the wetland areas at greatest risk and where mitigation may be needed. Species at Risk - beach amaranth Coastal...Species Sea beach amaranth surveys Annual Log book/GIS layer Wetlands (training areas monitored for impacts) Ongoing Log book/spreadsheet Training

  8. Best management practices plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This Best Management Practices (BMP) Plan has been developed as part of the environmental monitoring program at Waste Area Grouping (WAG) 6. The BMP Plan describes the requirements for personnel training, spill prevention and control, environmental compliance, and sediment/erosion control as they relate to environmental monitoring activities and installation of Monitoring Station 4 at WAG 6.

  9. Maintenance Planning of Offshore Wind Turbine using Condition Monitoring Information

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    incorporating CMI, addressing this analysis to fatigue prone details in welded steel joints at jacket or tripod steel support structures for offshore wind turbines. The increase of turbulence in wind farms is taken into account by using a code-based turbulence model. Further, additional modes t integrate CMI...... in the RBI approach for optimal planning of inspection and maintenance. As part of the results, the life cycle reliabilities and inspection times are calculated, showing that earlier inspections are needed at in-wind farm sites. This is expected due to the wake turbulence increasing the wind load...

  10. Plasmodium falciparum Expressing Domain Cassette 5 Type PfEMP1 (DC5-PfEMP1) Bind PECAM1

    DEFF Research Database (Denmark)

    Berger, Sanne S; Turner, Louise; Wang, Christian W

    2013-01-01

    associated with the expression of particular subsets of PfEMP1 molecules. PfEMP1 are grouped into subtypes based on upstream sequences and the presence of semi-conserved PfEMP1 domain compositions named domain cassettes (DCs). Earlier studies have indicated that DC5-containing PfEMP1 (DC5-PfEMP1) are more......, and show that two genetically different parasite lines expressing DC5-PfEMP1 bind PECAM1, and that anti-DC5-specific antibodies inhibit binding of DC5-PfEMP1-expressing parasites to transformed human bone marrow endothelial cells (TrHBMEC). We also show that antibodies against each of the four domains...

  11. Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made.

  12. Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made.

  13. EMP/GMD Phase 0 Report, A Review of EMP Hazard Environments and Impacts

    Energy Technology Data Exchange (ETDEWEB)

    Rivera, Michael Kelly [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Backhaus, Scott N. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Woodroffe, Jesse Richard [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Henderson, Michael Gerard [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Bos, Randall J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Nelson, Eric Michael [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Kelic, Andjelka [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-11-01

    The purpose of this study is to determine methods to analyze the hazard environments, impacts, and consequences of different sources of electromagnetic pulse (EMP), including nuclear electromagnetic pulse (NEMP) and geomagnetic disturbance (GMD) on the U.S. electric power infrastructures and to use those methods to determine EMP and GMD events of concern. The study will be carried out in four phases, each of which will provide higher levels of analytic fidelity that focuses on those EMP/GMD sources and events that create significant consequences, or whose consequences are sufficiently uncertain, to require more in-depth study. This study will leverage the best experimental data; device, equipment and system models; and simulation tools currently available. This study focuses primarily on the bulk electric system (BES) including large generating stations, large power transformers, the transmission network, and transmission system protection. Electrical distribution systems may potentially be included, if warranted, after consideration of the consequences for the bulk power system.

  14. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    Energy Technology Data Exchange (ETDEWEB)

    Richard P. Wells

    2007-03-23

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year.

  15. Biological monitoring and abatement program plan for Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A.; Anderson, G.E.; Gregory, S.M.; Peterson, M.J.; Ryon, M.G.; Schilling, E.M.; Smith, J.G.; Southworth, G.R. [Oak Ridge National Lab., TN (United States); Phipps, T.L. [CKY, Inc., Oak Ridge, TN (United States)

    1997-06-01

    The overall purpose of this plan is to evaluate the receiving streams` biological communities for the duration of the permit and meet the objectives for the ORNL BMAP as outlined in the NPDES permit (Appendix). The ORNL BMAP will focus on those streams in the WOC watershed that (1) receive NPDES discharges and (2) have been identified as ecologically impacted. In response to the newly issued NPDES permit, the tasks that are included in this BMAP plan include monitoring biological communities (fish and benthic invertebrates), monitoring mercury contamination in fish and water, monitoring polychlorinated biphenyl (PCB) contamination in fish, and evaluating temperature loading from ORNL outfalls. The ORNL BMAP will evaluate the effects of sediment and oil and grease, as well as the chlorine control strategy through the use of biological community data. Monitoring will be conducted at sites in WOC, First Creek, Fifth Creek, Melton Branch, and WOL.

  16. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  17. RCRA Groundwater Monitoring Plan for Single-Shell Tank Waste Management Area C at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.; Narbutovskih, Susan M.

    2001-01-01

    This document describes the groundwater monitoring plan for Waste Management Area C located in the 200 East Area of the DOE Hanford Site. This plan is required under Resource Conservation and Recovery Act of 1976 (RCRA).

  18. Total monitor units influence on plan quality parameters in volumetric modulated arc therapy for breast case.

    Science.gov (United States)

    Mancosu, P; Reggiori, G; Alongi, F; Cozzi, L; Fogliata, A; Lobefalo, F; Navarria, P; Stravato, A; Tomatis, S; Scorsetti, M

    2014-05-01

    To investigate the correlation between total monitor units (MU), dosimetric findings, and pre-treatment quality assurance for volumetric modulated arc therapy (VMAT) by RapidArc (RA). Ten patients with breast cancer were considered. Dose prescriptions were: 48 Gy and 40.5 Gy in 15 fractions to, respectively, PTV(Boost) and PTVWholeBreast. A reference plan was optimized and four more plans using the "MU Objective", a tool for total MU controlling, were prepared imposing ± 20 and ± 50% total MU for inducing different complexities. Plan objectives were: D95% > 95% for both PTVs, and D2% Plans were evaluated in terms of technical parameters, dosimetric plan objectives findings and pre-treatment quality assurance (QA). Concerning PTVs, there were no significant differences for target coverage (D95%); mean doses for ipsilateral lung and controlateral breast, and V18 Gy for heart decreased with MUs increasing, reaching a plateau with reference plan. Body volume receiving low dose (V5-10 Gy) was minimized for reference plans. All plans had GAI (3 mm, 3%) > 95%. The data suggest that the best plan is the reference one, where the "MU Objective" tool was not used during optimisation. Nevertheless, it is advisable to use the "MU Objective" tool for re-planning when low GAI is found to increase its value. In this case, attention should be paid to OARs dose limits, since their values may be increased. Copyright © 2013 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  19. Monitoring plan for routine organic air emissions at the Radioactive Waste Management Complex Waste Storage Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Galloway, K.J.; Jolley, J.G.

    1994-06-01

    This monitoring plan provides the information necessary to perform routine organic air emissions monitoring at the Waste Storage Facilities located at the Transuranic Storage Area of the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. The Waste Storage Facilities include both the Type I and II Waste Storage Modules. The plan implements a dual method approach where two dissimilar analytical methodologies, Open-Path Fourier Transform Infrared Spectroscopy (OP-FTIR) and ancillary SUMMA{reg_sign} canister sampling, following the US Environmental Protection Agency (EPA) analytical method TO-14, will be used to provide qualitative and quantitative volatile organic concentration data. The Open-Path Fourier Transform Infrared Spectroscopy will provide in situ, real time monitoring of volatile organic compound concentrations in the ambient air of the Waste Storage Facilities. To supplement the OP-FTIR data, air samples will be collected using SUMMA{reg_sign}, passivated, stainless steel canisters, following the EPA Method TO-14. These samples will be analyzed for volatile organic compounds with gas chromatograph/mass spectrometry analysis. The sampling strategy, procedures, and schedules are included in this monitoring plan. The development of this monitoring plan is driven by regulatory compliance to the Resource Conservation and Recovery Act, State of Idaho Toxic Air Pollutant increments, Occupational Safety and Health Administration. The various state and federal regulations address the characterization of the volatile organic compounds and the resultant ambient air emissions that may originate from facilities involved in industrial production and/or waste management activities.

  20. Mitigation of Electromagnetic Pulse (EMP) Effects from Short-Pulse Lasers and Fusion Neutrons

    Energy Technology Data Exchange (ETDEWEB)

    Eder, D C; Throop, A; Brown, Jr., C G; Kimbrough, J; Stowell, M L; White, D A; Song, P; Back, N; MacPhee, A; Chen, H; DeHope, W; Ping, Y; Maddox, B; Lister, J; Pratt, G; Ma, T; Tsui, Y; Perkins, M; O' Brien, D; Patel, P

    2009-03-06

    Our research focused on obtaining a fundamental understanding of the source and properties of EMP at the Titan PW(petawatt)-class laser facility. The project was motivated by data loss and damage to components due to EMP, which can limit diagnostic techniques that can be used reliably at short-pulse PW-class laser facilities. Our measurements of the electromagnetic fields, using a variety of probes, provide information on the strength, time duration, and frequency dependence of the EMP. We measure electric field strengths in the 100's of kV/m range, durations up to 100 ns, and very broad frequency response extending out to 5 GHz and possibly beyond. This information is being used to design shielding to mitigate the effects of EMP on components at various laser facilities. We showed the need for well-shielded cables and oscilloscopes to obtain high quality data. Significant work was invested in data analysis techniques to process this data. This work is now being transferred to data analysis procedures for the EMP diagnostics being fielded on the National Ignition Facility (NIF). In addition to electromagnetic field measurements, we measured the spatial and energy distribution of electrons escaping from targets. This information is used as input into the 3D electromagnetic code, EMSolve, which calculates time dependent electromagnetic fields. The simulation results compare reasonably well with data for both the strength and broad frequency bandwidth of the EMP. This modeling work required significant improvements in EMSolve to model the fields in the Titan chamber generated by electrons escaping the target. During dedicated Titan shots, we studied the effects of varying laser energy, target size, and pulse duration on EMP properties. We also studied the effect of surrounding the target with a thick conducting sphere and cube as a potential mitigation approach. System generated EMP (SGEMP) in coaxial cables does not appear to be a significant at Titan. Our

  1. Ground-water monitoring compliance plan for the Hanford Site Solid Waste Landfill

    Energy Technology Data Exchange (ETDEWEB)

    Fruland, R.M.

    1986-10-01

    Washington state regulations required that solid waste landfill facilities have ground-water monitoring programs in place by May 27, 1987. This document describes the well locations, installation, characterization studies and sampling and analysis plan to be followed in implementing the ground-water monitoring program at the Hanford Site Solid Waste Landfill (SWL). It is based on Washington Administrative Code WAC 173-304-490. 11 refs., 19 figs., 4 tabs.

  2. Inventory and Monitoring Plan for Washita National Wildlife Refuge and Optima National Wildlife Refuge, January 2, 2015

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Inventory and Monitoring Plan (IMP) documents the inventory and monitoring surveys that will or could be conducted at Washita and Optima NWRs from 2015 through...

  3. Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C.

    2005-09-01

    This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

  4. Plasma radome designed for the EMP effects defense

    Science.gov (United States)

    Li, Zhigang; Wang, Jiachun; Cheng, Li; Wang, Qichao

    2016-11-01

    Radar, as the main detection means, plays an extremely important role in modern warfare. However, it is easily attacked by the electromagnetic pulse (EMP) weapon. In order to defense the threat, a radome formed by plasma is designed. The plasma radome is used to protect the radar systems against EMP coupling through both `front door' and `back door'. What's more, the damage effects of EMP to the radar systems are analyzed, and the protection mechanism of plasma to EMP weapon is discussed. In addition, a simulation experiment is carried out to verify the feasibility of the plasma radome to defense against EMP. The results indicate that the structure performs well, which makes it a new method against EMP weapon.

  5. 1997 Monitoring report for the Gunnison, Colorado Wetlands Mitigation Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) cleaned up uranium mill tailings and other surface contamination near the town of Gunnison, Colorado. Remedial action resulted in the elimination of 4.3 acres (ac) (1.7 hectares [ha]) of wetlands. This loss is mitigated by the enhancement of six spring-fed areas on Bureau of Land Management (BLM) land (mitigation sites). Approximately 254 ac (1 03.3 ha) were fenced at the six sites to exclude grazing livestock. Of the 254 ac (103.3 ha), 17.8 ac (7.2 ha) are riparian plant communities; the rest are sagebrush communities. Baseline grazed conditions of the riparian plant communities at the mitigation sites were measured prior to fencing. This report discusses results of the fourth year of a monitoring program implemented to document the response of vegetation and wildlife to the exclusion of livestock. Three criteria for determining success of the mitigation were established: plant height, vegetation density (bare ground), and vegetation diversity. By 1996, Prospector Spring, Upper Long`s Gulch, and Camp Kettle met the criteria. The DOE requested transfer of these sites to BLM for long-term oversight. The 1997 evaluation of the three remaining sites, discussed in this report, showed two sites (Houston Gulch and Lower Long`s Gulch) meet the criteria. The DOE will request the transfer of these two sites to the BLM for long-term oversight. The last remaining site, Sage Hen Spring, has met only two of the criteria (percent bare ground and plant height). The third criterion, vegetation diversity, was not met. The vegetation appears to be changing from predominantly wet species to drier upland species, although the reason for this change is uncertain. It may be due to below-normal precipitation in recent years, diversion of water from the spring to the stock tank, or manipulation of the hydrology farther up gradient.

  6. Multi-agent planning and scheduling, execution monitoring and incremental rescheduling: Application to motorway traffic

    Science.gov (United States)

    Mourou, Pascal; Fade, Bernard

    1992-01-01

    This article describes a planning method applicable to agents with great perception and decision-making capabilities and the ability to communicate with other agents. Each agent has a task to fulfill allowing for the actions of other agents in its vicinity. Certain simultaneous actions may cause conflicts because they require the same resource. The agent plans each of its actions and simultaneously transmits these to its neighbors. In a similar way, it receives plans from the other agents and must take account of these plans. The planning method allows us to build a distributed scheduling system. Here, these agents are robot vehicles on a highway communicating by radio. In this environment, conflicts between agents concern the allocation of space in time and are connected with the inertia of the vehicles. Each vehicle made a temporal, spatial, and situated reasoning in order to drive without collision. The flexibility and reactivity of the method presented here allows the agent to generate its plan based on assumptions concerning the other agents and then check these assumptions progressively as plans are received from the other agents. A multi-agent execution monitoring of these plans can be done, using data generated during planning and the multi-agent decision-making algorithm described here. A selective backtrack allows us to perform incremental rescheduling.

  7. Plan for Demonstration of Online Monitoring for the Light Water Reactor Sustainability Online Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Magdy S. Tawfik; Vivek Agarwal; Nancy J. Lybeck

    2011-09-01

    Condition based online monitoring technologies and development of diagnostic and prognostic methodologies have drawn tremendous interest in the nuclear industry. It has become important to identify and resolve problems with structures, systems, and components (SSCs) to ensure plant safety, efficiency, and immunity to accidents in the aging fleet of reactors. The Machine Condition Monitoring (MCM) test bed at INL will be used to demonstrate the effectiveness to advancement in online monitoring, sensors, diagnostic and prognostic technologies on a pilot-scale plant that mimics the hydraulics of a nuclear plant. As part of this research project, INL will research available prognostics architectures and their suitability for deployment in a nuclear power plant. In addition, INL will provide recommendation to improve the existing diagnostic and prognostic architectures based on the experimental analysis performed on the MCM test bed.

  8. Empédocles de Agrimento

    OpenAIRE

    García Gual, Carlos

    2014-01-01

    A través de la presentación y comentario de los textos de Empédocles, el autor se propone restaurar la complejidad de la vida y obra de este maestro de la verdad, más allá del reduccionismo al que ha estado sometido su estudio, o de la imagen de incoherencia que para algunos eruditos tiene su obra e incluso de las artificiosas explicaciones o intentos de conciliación de esa incoherencia. Tanto por las fuentes de su saber como por su peculiar situación histórica, así como por su universal amor...

  9. Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Brandt, C.C.; Cicerone, D.S. [and others

    1998-02-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y-12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided, but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas or a reduction in sampling intensity in others. By using the results of previous monitoring efforts to define the current program and to guide them in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

  10. On the role of model-based monitoring for adaptive planning under uncertainty

    Science.gov (United States)

    Raso, Luciano; Kwakkel, Jan; Timmermans, Jos; Haasnoot, Mariolijn

    2016-04-01

    Adaptive plans, designed to anticipate and respond to an unfolding uncertain future, have found a fertile application domain in the planning of deltas that are exposed to rapid socioeconomic development and climate change. Adaptive planning, under the moniker of adaptive delta management, is used in the Dutch Delta Program for developing a nation-wide plan to prepare for uncertain climate change and socio-economic developments. Scientifically, adaptive delta management relies heavily on Dynamic Adaptive Policy Pathways. Currently, in the Netherlands the focus is shifting towards implementing the adaptive delta plan. This shift is especially relevant because the efficacy of adaptive plans hinges on monitoring on-going developments and ensuring that actions are indeed taken if and when necessary. In the design of an effective monitoring system for an adaptive plan, three challenges have to be confronted: • Shadow of the past: The development of adaptive plans and the design of their monitoring system relies heavily on current knowledge of the system, and current beliefs about plausible future developments. A static monitoring system is therefore exposed to the exact same uncertainties one tries to address through adaptive planning. • Inhibition of learning: Recent applications of adaptive planning tend to overlook the importance of learning and new information, and fail to account for this explicitly in the design of adaptive plans. • Challenge of surprise: Adaptive policies are designed in light of the current foreseen uncertainties. However, developments that are not considered during the design phase as being plausible could still substantially affect the performance of adaptive policies. The shadow of the past, the inhibition of learning, and the challenge of surprise taken together suggest that there is a need for redesigning the concepts of monitoring and evaluation to support the implementation of adaptive plans. Innovations from control theory

  11. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Description.

    Science.gov (United States)

    Ford, Valeria A.

    The design of the Planning, Monitoring, and Implementation Model (PMI) and the aspects of the model that make it useful in public schools are the topics of this paper. After the objectives of a program or operation have been identified, the model specifies three additional pieces of information that are needed for an evaluation: inputs, processes,…

  12. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Rationale.

    Science.gov (United States)

    Cort, H. Russell

    The rationale for the Planning, Monitoring, and Implementation Model (PMI) is the subject of this paper. The Superintendent of the District of Columbia Public Schools requested a model for systematic evaluation of educational programs to determine their effectiveness. The school system's emphasis on objective-referenced instruction and testing,…

  13. Defense Business Transformation: DOD Should Improve Its Planning with and Performance Monitoring of the Military Departments

    Science.gov (United States)

    2016-12-01

    Management Officer (CMO) and Deputy Chief Management Officer (DCMO) Roles and Responsibilities of the DOD CMO • Ensure DOD’s core business functions...DEFENSE BUSINESS TRANSFORMATION DOD Should Improve Its Planning with and Performance Monitoring of the Military...Government Accountability Office Highlights of GAO-17-9, a report to congressional addresses December 2016 DEFENSE BUSINESS TRANSFORMATION DOD Should

  14. Management, Planning, and Monitoring Population Education Programmes. Abstract-Bibliography Series 8.

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    This document abstracts and reviews 32 publications that describe population education programs developed for Asia and the Pacific region. The documents are grouped under three sections: (1) management; (2) planning; and (3) monitoring/evaluation. Section 1 consists of 12 selected titles that deal with management of population education programs.…

  15. EMP-002a Phase Shift through the Ionosphere

    Energy Technology Data Exchange (ETDEWEB)

    Soltz, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Simons, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fenimore, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wilks, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Carey, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-10-20

    In this note we review the derivation and use of the Ionospheric Transfer Function (ITF) in the DIO- RAMA model to calculate the propagation of a broad band ElectroMagnetic Pulse (EMP) through the Ionosphere in the limit of geometric optics. This note is intended to resolve a misunderstanding between the NDS VVA and EMP modeling teams regarding the appropriate use of the phase and group velocities in DIORAMA. The di erent approaches are documented in EMP-002 note, \\Phase vs. Group" [1], generated by the LLNL DIORAMA VVA team, and the subsequent response from the DIORAMA EMP modeling team' [2].

  16. Facility effluent monitoring plan for K area spent fuel storage basin

    Energy Technology Data Exchange (ETDEWEB)

    Hunacek, G.S., Westinghouse Hanford

    1996-08-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400. 1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in WHC-EP-0438-1, A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the second revision to the original annual report. Long-range integrity ofthe effluent monitoring systenu shall be ensured with updates of this report whenever a new process or oper&ion introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimwn of every three years.

  17. An evaluation of resource inventory and monitoring program used in national forest planning

    Science.gov (United States)

    Morrison, Michael L.; Marcot, Bruce G.

    1995-01-01

    The National Forest Management Act (1976) specifies that multiresource inventories be conducted to provide baseline data for development and, later, monitoring of national forest management plans. This mandate entails the most ambitious and complex resource planning effort ever attempted. In this paper we evaluate the structure and use of current inventory-monitoring programs and recommend a framework for gathering data to improve national forest planning. Current national guidelines are general and provide only basic directions to forest-level planners. Forest inventories have traditionally concentrated on timber. Although these inventories are often well designed, the questions we are now asking about forest resources have outgrown these methods. Forest management is impeded by general confusion over definitions of resources and the interactions among them. We outline a simple classification scheme that centers on identification of basic ecosystem elements that can be readily measured. Furthermore, spatial and temporal scales must be considered in the design of inventory-monitoring programs. The concept of ecological indicators is reviewed, and caution is advised in their use. Inventory-monitoring programs should be goal-directed and based on as rigorous a statistical design as possible. We also review fundamental issues of variable selection, validation, and sampling bias. We conclude by developing a flexible inventory-monitoring program that is designed to provide information on individual characteristics of the environment, rather than being based on fixed definitions of resources.

  18. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.

  19. Topological clustering as a tool for planning water quality monitoring in water distribution networks

    DEFF Research Database (Denmark)

    Kirstein, Jonas Kjeld; Albrechtsen, Hans-Jørgen; Rygaard, Martin

    2015-01-01

    Topological clustering was explored as a tool for water supply utilities in preparation of monitoring and contamination contingency plans. A complex water distribution network model of Copenhagen, Denmark, was simplified by topological clustering into recognizable water movement patterns to: (1......) identify steady clusters for a part of the network where an actual contamination has occurred; (2) analyze this event by the use of mesh diagrams; and (3) analyze the use of mesh diagrams as a decision support tool for planning water quality monitoring. Initially, the network model was divided...... into strongly and weakly connected clusters for selected time periods and mesh diagrams were used for analysing cluster connections in the Nørrebro district. Here, areas of particular interest for water quality monitoring were identified by including user-information about consumption rates and consumers...

  20. The MEPPP Framework: A Framework for Monitoring and Evaluating Participatory Planning Processes.

    Science.gov (United States)

    Hassenforder, Emeline; Pittock, Jamie; Barreteau, Olivier; Daniell, Katherine Anne; Ferrand, Nils

    2016-01-01

    Evaluating participatory processes, participatory planning processes especially, can be challenging. Due to their complexity, these processes require a specific approach to evaluation. This paper proposes a framework for evaluating projects that have adopted a participatory planning approach: the monitoring and evaluation of participatory planning processes (MEPPP) framework. The MEPPP framework is applied to one case study, a participatory planning process in the Rwenzori region in Uganda. We suggest that this example can serve as a guideline for researchers and practitioners to set up the monitoring and evaluation of their participatory planning process of interest by following six main phases: (1) description of the case, (2) clarification of the M&E viewpoint(s) and definition of the M&E objective(s), (3) identification of the context, process and outputs/outcomes analytical variables, (4) development of the M&E methods and data collection, (5) data analysis, and (6) sharing of the M&E results. Results of the application of the MEPPP framework in Uganda demonstrate the ability of the framework to tackle the complexity of participatory planning processes. Strengths and limitations of the MEPPP framework are also discussed.

  1. 78 FR 57668 - U.S. Nuclear Regulatory Commission Planned for Monitoring Activities for the Saltstone Disposal...

    Science.gov (United States)

    2013-09-19

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION U.S. Nuclear Regulatory Commission Planned for Monitoring Activities for the Saltstone Disposal... availability of ``U.S. Nuclear Regulatory Commission Plan for Monitoring Disposal Actions Taken by the...

  2. Revised ground-water monitoring compliance plan for the 300 area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

  3. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    Energy Technology Data Exchange (ETDEWEB)

    Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q. [Department of Radiation Oncology, Duke University Medical Center Durham, North Carolina 27710 (United States)

    2015-01-15

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery

  4. Quality assurance for online adapted treatment plans: benchmarking and delivery monitoring simulation.

    Science.gov (United States)

    Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q

    2015-01-01

    An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were

  5. A risk-based sampling plan for monitoring of histamine in fish products.

    Science.gov (United States)

    Guillier, L; Thébault, A; Gauchard, F; Pommepuy, M; Guignard, A; Malle, P

    2011-02-01

    In 2008, the French Institute for Public Health Surveillance reported an increase in the number of histamine food poisoning outbreaks and cases in France. The aim of this study was to propose a new monitoring plan for characterizing consumers' exposure to histamine through fishery products. As fish products of concern are numerous, we proposed that the number of samples allocated for a fish category be chosen based on the risk associated with the category. Point risk estimates of histamine poisoning were assessed with the Risk Ranger tool. Fresh fish with high histidine content was found to contribute most to the number of cases. The (estimated) risks associated with the consumption of canned and deep-frozen fish appear marginal as compared with the risk associated with fresh fish with high histidine concentrations. Accordingly, we recommend excluding canned and deep-frozen fish from the monitoring plan, although these risk estimates can be biased. Within a category, samples were proportional to the relative food consumption of the different fishes. The spatial and seasonal consumption patterns were also taken into account for the design of the new monitoring plan. By testing appropriate numbers of samples from categories of fish products of concern, this plan will permit investigation of trends or comparison of product categories presenting risks of histamine poisoning.

  6. r-Process Elements in EMP stars: Indicators of Inhomogeneous Early Halo Enrichment

    Science.gov (United States)

    Andersen, Johannes; Nordström, Birgitta; Thidemann Hansen, Terese

    2015-08-01

    Extremely metal-poor (EMP) halo stars with [Fe/H] below ~ -3 are considered to be fossil records of conditions in the early halo. In the simplest picture where iron is a proxy for overall metallicity and indirectly for time, EMP stars formed before the oldest and most metal-poor Galactic globular clusters. High-resolution spectroscopy with 8m-class telescopes has shown the detailed abundance pattern of these stars to be surprisingly uniform (e.g. Bonifacio+ 2012) and essentially Solar, apart from the α-enhancement typical of SN II nucleosynthesis. A small fraction (~3%) of EMP stars, however, is strongly enhanced in the heaviest (r-process) neutron-capture elements, highlighting that the periodic system of elements was fully populated already this early.These striking departures from the general chemical homogeneity could be produced by local or distant sources. The former case is simple - mass transfer from a binary companion that evolved to produce a highly neutron-rich environment (one or more NS). Alternatively, the r-process elements were formed in a site at interstellar distance and preferentially seeded into the natal clouds of the present-day EMP-r stars. Our long-term, precise monitoring of the radial velocities of a sample of such stars (Hansen+ 2011) disproved the binary hypothesis, which would in fact also fail to explain the existence of r-process poor stars, such as HD 122653. We thus conclude that the chemical enrichment of the early halo was far more complex, patchy and likely anisotropic than assumed in current models of Galactic chemical evolution: The EMP-r stars are not just peculiarities to be ignored, but indicate that a new level of complexity must be invoked. That r-process elements have not (yet) been observed in high-redshift DLA systems is readily explained by their low abundance relative to the lighter species and the rarity of strong enrichment events.

  7. Effectiveness monitoring for the aquatic and riparian component of the Northwest Forest Plan: conceptual framework and options.

    Science.gov (United States)

    Gordon H. Reeves; David B. Hohler; David P. Larsen; David E. Busch; Kim Kratz; Keith Reynolds; Karl F. Stein; Thomas Atzet; Polly Hays; Michael. Tehan

    2004-01-01

    An Aquatic and Riparian Effectiveness Monitoring Plan (AREMP) for the Northwest Forest Plan is intended to characterize the ecological condition of watersheds and aquatic ecosystems. So to determine the effectiveness of the Northwest Forest Plan to meet relevant objectives, this report presents the conceptual foundation of options for use in pilot testing and...

  8. Auditory N1 reveals planning and monitoring processes during music performance.

    Science.gov (United States)

    Mathias, Brian; Gehring, William J; Palmer, Caroline

    2017-02-01

    The current study investigated the relationship between planning processes and feedback monitoring during music performance, a complex task in which performers prepare upcoming events while monitoring their sensory outcomes. Theories of action planning in auditory-motor production tasks propose that the planning of future events co-occurs with the perception of auditory feedback. This study investigated the neural correlates of planning and feedback monitoring by manipulating the contents of auditory feedback during music performance. Pianists memorized and performed melodies at a cued tempo in a synchronization-continuation task while the EEG was recorded. During performance, auditory feedback associated with single melody tones was occasionally substituted with tones corresponding to future (next), present (current), or past (previous) melody tones. Only future-oriented altered feedback disrupted behavior: Future-oriented feedback caused pianists to slow down on the subsequent tone more than past-oriented feedback, and amplitudes of the auditory N1 potential elicited by the tone immediately following the altered feedback were larger for future-oriented than for past-oriented or noncontextual (unrelated) altered feedback; larger N1 amplitudes were associated with greater slowing following altered feedback in the future condition only. Feedback-related negativities were elicited in all altered feedback conditions. In sum, behavioral and neural evidence suggests that future-oriented feedback disrupts performance more than past-oriented feedback, consistent with planning theories that posit similarity-based interference between feedback and planning contents. Neural sensory processing of auditory feedback, reflected in the N1 ERP, may serve as a marker for temporal disruption caused by altered auditory feedback in auditory-motor production tasks.

  9. Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Brandt, C.C.; Christensen, S.W.; Greeley, M.S.JR.; Hill, W.R.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.

    2000-09-01

    The revised Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted as required by the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995 and became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Science Division (ESD) at the Oak Ridge National Laboratory (ORNL) at the request of the Y-12 Plant. The revision to the BMAP plan is based on results of biological monitoring conducted during the period of 1985 to present. Details of the specific procedures used in the current routine monitoring program are provided; experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional bioaccumulation monitoring if results indicate unexpectedly high PCBs or Hg) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is still observed). The program scope will be re-evaluated annually. By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of Y-12 Plant operations (past and present) on the biota of EFPC and to document the ecological effects of remedial actions.

  10. Domestic Water Service Delivery Indicators and Frameworks for Monitoring, Evaluation, Policy and Planning: A Review

    Directory of Open Access Journals (Sweden)

    Jamie Bartram

    2013-10-01

    Full Text Available Monitoring of water services informs policy and planning for national governments and the international community. Currently, the international monitoring system measures the type of drinking water source that households use. There have been calls for improved monitoring systems over several decades, some advocating use of multiple indicators. We review the literature on water service indicators and frameworks with a view to informing debate on their relevance to national and international monitoring. We describe the evidence concerning the relevance of each identified indicator to public health, economic development and human rights. We analyze the benefits and challenges of using these indicators separately and combined in an index as tools for planning, monitoring, and evaluating water services. We find substantial evidence on the importance of each commonly recommended indicator—service type, safety, quantity, accessibility, reliability or continuity of service, equity, and affordability. Several frameworks have been proposed that give structure to the relationships among individual indicators and some combine multiple indicator scores into a single index but few have been rigorously tested. More research is needed to understand if employing a composite metric of indicators is advantageous and how each indicator might be scored and scaled.

  11. Domestic Water Service Delivery Indicators and Frameworks for Monitoring, Evaluation, Policy and Planning: A Review

    Science.gov (United States)

    Kayser, Georgia L.; Moriarty, Patrick; Fonseca, Catarina; Bartram, Jamie

    2013-01-01

    Monitoring of water services informs policy and planning for national governments and the international community. Currently, the international monitoring system measures the type of drinking water source that households use. There have been calls for improved monitoring systems over several decades, some advocating use of multiple indicators. We review the literature on water service indicators and frameworks with a view to informing debate on their relevance to national and international monitoring. We describe the evidence concerning the relevance of each identified indicator to public health, economic development and human rights. We analyze the benefits and challenges of using these indicators separately and combined in an index as tools for planning, monitoring, and evaluating water services. We find substantial evidence on the importance of each commonly recommended indicator—service type, safety, quantity, accessibility, reliability or continuity of service, equity, and affordability. Several frameworks have been proposed that give structure to the relationships among individual indicators and some combine multiple indicator scores into a single index but few have been rigorously tested. More research is needed to understand if employing a composite metric of indicators is advantageous and how each indicator might be scored and scaled. PMID:24157507

  12. The use of condition monitoring information for maintenance planning and decision-making

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K.; Rosqvist, T. [VTT Industrial Systems (Finland); Paulsen, J.L. [Risoe National Lab., Roskilde (Denmark)

    2002-12-01

    A survey is presented outlining the use of condition monitoring information in three Nordic nuclear power plants. The questions of the survey relate to the role of condition monitoring in strategic, as well as operative, maintenance planning and decision-making. The survey indicates that condition monitoring is increasingly implemented at nuclear power plants, but very selectively and in a rather slow pace for predictive maintenance. A combined strategy of condition based maintenance and predetermined preventive maintenance is applied for important equipment such as main circulation pumps and steam turbines. A realistic aim is to reduce the number of costly or error prone maintenance and disassembling inspection activities by condition monitoring given that the approach enables a good diagnosis and prediction. Systematic follow-up and analysis of such condition monitoring information followed by a case-specific planning and decision making of timely and rightly directed maintenance actions can justify an extension of the intervals of a number of predetermined inspection, maintenance or periodic testing tasks. (au)

  13. Psicoterapia y Procesos Empáticos

    Directory of Open Access Journals (Sweden)

    Zagmutt, A

    2008-07-01

    Full Text Available Se revisa la situación actual de la terapia cognitiva postulando una continuidad desde los enfoques conductistas hasta el posracionalismo en términos de la complejidad evolutiva de los modelos en relación a su concepción de la mente. Desde los mas objetivistas y representacionales hasta los mas autorreferenciales. En segundo lugar se hace referencia a la relevancia de la dimensión corporal para la comprensión de la experiencia humana de acuerdo a los datos invariantes que surgen desde los avances en el conocimiento. En tercer lugar se ofrecen algunas observaciones de como estos hallazgos pueden ser incorporados a nuestro quehacer como clínicos enfatizando la relevancia de los procesos empáticos.

  14. Liquid Effluent Monitoring Information System test plans release 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.T.

    1994-10-11

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user.

  15. Liquid Effluent Monitoring Information System (LEMIS) test plans release 1.1

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.T.

    1994-09-08

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user.

  16. Liquid Effluent Monitoring Information System (LEMIS) test plans release 1.0

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.T.

    1994-10-12

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user.

  17. Independent verification of monitor unit calculation for radiation treatment planning system.

    Science.gov (United States)

    Chen, Li; Chen, Li-Xin; Huang, Shao-Min; Sun, Wen-Zhao; Sun, Hong-Qiang; Deng, Xiao-Wu

    2010-02-01

    To ensure the accuracy of dose calculation for radiation treatment plans is an important part of quality assurance (QA) procedures for radiotherapy. This study evaluated the Monitor Units (MU) calculation accuracy of a third-party QA software and a 3-dimensional treatment planning system (3D TPS), to investigate the feasibility and reliability of independent verification for radiation treatment planning. Test plans in a homogenous phantom were designed with 3-D TPS, according to the International Atomic Energy Agency (IAEA) Technical Report No. 430, including open, blocked, wedge, and multileaf collimator (MLC) fields. Test plans were delivered and measured in the phantom. The delivered doses were input to the QA software and the independent calculated MUs were compared with delivery. All test plans were verified with independent calculation and phantom measurements separately, and the differences of the two kinds of verification were then compared. The deviation of the independent calculation to the measurements was (0.1 +/- 0.9)%, the biggest difference fell onto the plans that used block and wedge fields (2.0%). The mean MU difference between the TPS and the QA software was (0.6 +/- 1.0)%, ranging from -0.8% to 2.8%. The deviation in dose of the TPS calculation compared to the measurements was (-0.2 +/- 1.7)%, ranging from -3.9% to 2.9%. MU accuracy of the third-party QA software is clinically acceptable. Similar results were achieved with the independent calculations and the phantom measurements for all test plans. The tested independent calculation software can be used as an efficient tool for TPS plan verification.

  18. OAK RIDGE Y-12 PLANT BIOLOGICAL MONITORING AND ABATEMENT PROGRAM (BMAP) PLAN

    Energy Technology Data Exchange (ETDEWEB)

    ADAMS, S.M.; BRANDT, C.C.; CHRISTENSEN, S.W.; CICERONE, D.S.; GREELEY, M.S.JR; HILL, W.R.; HUSTON, M.S.; KSZOS, L.A.; MCCARTHY, J.F.; PETERSON, M.J.; RYON, M.G.; SMITH, J.G.; SOUTHWORTH, G.R.; STEWART, A.J.

    1998-10-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y- 12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional toxicity testing if initial results indicate low survival or reproduction) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is observed). By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

  19. Identifying the 'if' for 'if-then' plans: combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour.

    Science.gov (United States)

    Verhoeven, Aukje A C; Adriaanse, Marieke A; de Vet, Emely; Fennis, Bob M; de Ridder, Denise T D

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring, a novel way to gain insight into triggers for unhealthy snacking. It was tested whether keeping a cue-monitoring diary and tailoring implementation intentions accordingly improves plan effectiveness. A 2 Monitoring (cue-monitoring, control) × 2 Planning (implementation intention, goal intention) between subjects design was adopted. Participants (N = 161) monitored their unhealthy snacking behaviour for a week using either a cue-monitoring or a control diary. Participants then formulated a goal intention or an implementation intention tailored to their personal cue. Snacking frequency and caloric intake from unhealthy snacks were examined using a seven-day snack diary. The results did not indicate an interaction but yielded a main effect of Monitoring. Cue-monitoring either or not combined with implementation intentions reduced unhealthy snacking behaviour compared with control. Findings emphasise the effectiveness of cue-monitoring, suggesting that on the short term, cue-monitoring suffices to decrease unhealthy snacking, without additional benefit from planning. Future research should examine whether supplementing cue-monitoring with implementation intentions is required to establish long-term behaviour change maintenance.

  20. Hood River Production Program : Hood River Fish Habitat Protection, Restoration, and Monitoring Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Coccoli, Holly; Lambert, Michael

    2000-02-01

    Effective habitat protection and rehabilitation are essential to the long-term recovery of anadromous fish populations in the Hood River subbasin. This Habitat Protection, Restoration, and Monitoring Plan was prepared to advance the goals of the Hood River Production Program (HRRP) which include restoring self-sustaining runs of spring chinook salmon and winter and summer steelhead. The HRPP is a fish supplementation and monitoring and evaluation program initiated in 1991 and funded by the Bonneville Power Administration (BPA) as part of the Northwest Power Planning Council Fish and Wildlife Program. The HRPP is a joint effort of the Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO) and Oregon Department of Fish and Wildlife (ODFW). Using recent watershed assessment and federal watershed analysis reports, this Plan reviews the historic and current condition of riparian, instream and upland habitats; natural watershed processes; anadromous and resident fish populations; identifies limiting factors, and indicates those subbasin areas that need protection or are likely to respond to restoration. Primary habitat restoration needs were identified as (1) improved fish screening and upstream adult passage at water diversions; (2) improved spawning gravel availability, instream habitat structure and diversity; and (3) improved water quality and riparian conditions. While several early action projects have been initiated in the Hood River subbasin since the mid 1990s, this Plan outlines additional projects and strategies needed to protect existing high quality habitat, correct known fish survival problems, and improve the habitat capacity for natural production to meet HRPP goals.

  1. Monitoring plan and maintenance NPP the Vandellos I and future prospects; Plan de vigilancia y mantenimiento de la instalacion nuclear Vandellos 1 y perspectivas de futuro

    Energy Technology Data Exchange (ETDEWEB)

    Margalef Escoda, S.

    2013-07-01

    This paper intends to give to know the singularities of an installation phase of latency and your monitoring and maintenance plan. the horizons that has the installation medium-term to guide the future dismantling level 3 monitoring and maintenance activities are also described.

  2. Hydrologic data and description of a hydrologic monitoring plan for Medicine Lake Volcano, California

    Science.gov (United States)

    Schneider, Tiffany Rae; McFarland, W.D.

    1996-01-01

    A hydrologic reconnaissance of the Medicine Lake Volcano area was done to collect data needed for the design of a hydrologic monitoring plan. The reconnaissance was completed during two field trips made in June and September 1992, during which geothermal and hydrologic features of public interest in the Medicine Lake area were identified. Selected wells, springs, and geothermal features were located and documented, and initial water-level, discharge, temperature, and specific-conductance measurements were made. Lakes in the study area also were surveyed during the September field trip. Temperature, specific- conductance, dissolved oxygen, and pH data were collected by using a multiparameter probe. The proposed monitoring plan includes measurement of water levels in wells, discharge from springs, and lake stage, as well as analysis of well-,spring-, and lake-water quality. In determining lake-water quality, data for both stratified and unstratified conditions would be considered. (Data for stratified conditions were collected during the reconnaissance phase of this project, but data for unstratified conditions were not.) In addition, lake stage also would be monitored. A geothermal feature near Medicine Lake is a "hot spot" from which hot gases discharge from two distinct vents. Gas chemistry and temperature would be monitored in one of these vents.

  3. Surveillance Plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This Surveillance Plan has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model The baseline monitoring phase is expected to begin in 1994 and continue for 12--18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC The routine annual monitoring phase will continue for {approximately}4 years after completion of the baseline monitoring phase. This Surveillance Plan presents the technical and quality assurance surveillance activities for the various WAG 6 environmental monitoring and data evaluation plans and implementing procedures.

  4. Effects of minimum monitor unit threshold on spot scanning proton plan quality.

    Science.gov (United States)

    Howard, Michelle; Beltran, Chris; Mayo, Charles S; Herman, Michael G

    2014-09-01

    To investigate the influence of the minimum monitor unit (MU) on the quality of clinical treatment plans for scanned proton therapy. Delivery system characteristics limit the minimum number of protons that can be delivered per spot, resulting in a min-MU limit. Plan quality can be impacted by the min-MU limit. Two sites were used to investigate the impact of min-MU on treatment plans: pediatric brain tumor at a depth of 5-10 cm; a head and neck tumor at a depth of 1-20 cm. Three-field, intensity modulated spot scanning proton plans were created for each site with the following parameter variations: min-MU limit range of 0.0000-0.0060; and spot spacing range of 2-8 mm. Comparisons were based on target homogeneity and normal tissue sparing. For the pediatric brain, two versions of the treatment planning system were also compared to judge the effects of the min-MU limit based on when it is accounted for in the optimization process (Eclipse v.10 and v.13, Varian Medical Systems, Palo Alto, CA). The increase of the min-MU limit with a fixed spot spacing decreases plan quality both in homogeneous target coverage and in the avoidance of critical structures. Both head and neck and pediatric brain plans show a 20% increase in relative dose for the hot spot in the CTV and 10% increase in key critical structures when comparing min-MU limits of 0.0000 and 0.0060 with a fixed spot spacing of 4 mm. The DVHs of CTVs show min-MU limits of 0.0000 and 0.0010 produce similar plan quality and quality decreases as the min-MU limit increases beyond 0.0020. As spot spacing approaches 8 mm, degradation in plan quality is observed when no min-MU limit is imposed. Given a fixed spot spacing of ≤4 mm, plan quality decreases as min-MU increased beyond 0.0020. The effect of min-MU needs to be taken into consideration while planning proton therapy treatments.

  5. Impact of an in-built monitoring system on family planning performance in rural Bangladesh

    Directory of Open Access Journals (Sweden)

    Ashraf Ali

    2007-06-01

    Full Text Available Abstract Background During 1982–1992, the Maternal and Child Health Family Planning (MCH-FP Extension Project (Rural of International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B, in partnership with the Ministry of Health and Family Welfare (MoHFW of the Government of Bangladesh (GoB, implemented a series of interventions in Sirajganj Sadar sub-district of Sirajganj district. These interventions were aimed at improving the planning mechanisms and for reviewing the problem-solving processes to build an effective monitoring system of the interventions at the local level of the overall system of the MOHFW, GoB. Methods The interventions included development and testing of innovative solutions in service-delivery, provision of door-step injectables, and strengthening of the management information system (MIS. The impact of an in-built monitoring system on the overall performance was assessed during the period from June 1995 to December 1996, after the withdrawal of the interventions in 1992. Results The results of the assessment showed that Family Welfare Assistants (FWAs increased household-visits within the last two months, and there was a higher use of service-delivery points even after the withdrawal of the interventions. The results of the cluster surveys, conducted in 1996, showed that the selected indicators of health and family-planning services were higher than those reported by the Bangladesh Demographic and Health Survey (BDHS 1996–1997. During June 1995-December, 1996, the contraceptive prevalence rate (CPR increased by 13 percentage points (i.e. from 40% to 53%. Compared to the national CPR (49%, this increase was statistically significant (p Conclusion The in-built monitoring systems, including effective MIS, accompanied by rapid assessments and review of performance by the programme managers, have potentials to improve family planning performance in low-performing areas.

  6. Headcount and FTE data in the European health workforce monitoring and planning process.

    Science.gov (United States)

    Girasek, Edmond; Kovács, Eszter; Aszalós, Zoltán; Eke, Edit; Ragány, Károly; Kovács, Réka; Cserháti, Zoltán; Szócska, Miklós

    2016-07-16

    Health workforce (HWF) planning and monitoring processes face challenges regarding data and appropriate indicators. One such area fraught with difficulties is labour activity and, more specifically, defining headcount and full-time equivalent (FTE). This study aims to review national practices in FTE calculation formulas for selected EU Member States (MS). The research was conducted as a part of the Joint Action on European Health Workforce Planning and Forecasting. Definitions, categories and terms concerning the five sectoral professions were examined in 14 MS by conducting a survey. To gain a deeper understanding of the international data-reporting processes (Joint Questionnaire on Non-Monetary Health Care Statistics-JQ), six international expert interviews were conducted by using a semi-structured interview guide. Of the 14 investigated countries, four MS indicated that they report FTE to the JQ and that they also calculate FTE data for national planning purposes. The other countries do not use FTE data for national purposes, but most of them do use special calculations and/or estimation methods for converting headcount to FTE. The findings revealed significant differences between national calculation methods when reporting FTE data to the JQ. This diversity in terms of calculations and estimations can lead to biases with respect to international comparisons. This finding was reinforced by the expert interviews, since the experts agreed that the activities of healthcare professionals are a fundamental factor in HWF monitoring and planning. Experts underscored that activity should also be measured by FTE, and not only by headcount. FTE and headcount are significant factors in HWF planning and monitoring; therefore, national data collections should place emphasis on collecting data and calculating the appropriate indicators. National FTE could serve as a call to action for HWF planners due to the lack of matching international FTE data. At the international level

  7. Identifying the 'if' for 'if-then' plans : Combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour

    NARCIS (Netherlands)

    Verhoeven, Aukje A. C.; Adriaanse, Marieke A.; de Vet, Emely; Fennis, Bob M.; de Ridder, Denise T. D.

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring,

  8. Remote sensing applied to crop disease control, urban planning, and monitoring aquatic plants, oil spills, rangelands, and soil moisture

    Science.gov (United States)

    1975-01-01

    The application of remote sensing techniques to land management, urban planning, agriculture, oceanography, and environmental monitoring is discussed. The results of various projects are presented along with cost effective considerations.

  9. Ten years of demographic and genetic monitoring of Stachys maritima in Catalonia (2001-2010. Implications for a recovery plan

    Directory of Open Access Journals (Sweden)

    Massó, S.

    2010-12-01

    Full Text Available Stachys maritima is a species typical of the coastal dunes, with a wide distribution within the Mediterranean Basin. In spite of this, the species shows a clear regression. In Catalonia, it has been observed an important reduction of its populations since early 20th century, where it has disappeared from several localities in which it was relatively common (Tarragonès, Barcelonès. Herein we present the results of the demographic monitoring of the species during the last 10 years (2001-2010 in the known localities in Catalonia. Besides corroborating the disappearance (northern Sant Martí d’Empúries, the re-discovering (Llobregat Delta beach and the detection of new populations (inner dunes of the Montgrí, a large year-to-year fluctuation of the monitored populations is stated; the possible reasons are discussed. In addition, the present work also includes the results of the allozyme diversity analysis of the new detected populations as well as the rediscoveries of the period 2004-2008, which were not included in a former study of genetic diversity carried out in 2002-2003. It is necessary to emphasize that the contribution of the new populations to the genetic diversity of Stachys maritima is very small, which can be attributed to their limited population size and /or to founder effects. Despite that the species is included in the Annex 2 (“En Perill d’Extinció” within the Catàleg de Flora Amenaçada de Catalunya (Catalogue of Endangered Flora of Catalonia, and some “soft” conservation measures have been applied at local level (signposting of the beach accesses, environmental education, etc. coupled with other more significant measures (e.g. translocation of individuals discovered in an artificial sandbank, it would be necessary the coordinated action and the scientific support of any initiative of conservation that could be carried out. The general frame to initiate actions of conservation should be the recovery plan of

  10. JEM spotlight: Nuclear desalination--environmental impacts and implications for planning and monitoring activities.

    Science.gov (United States)

    Anastasov, Vladimir; Khamis, Ibrahim

    2010-01-01

    Nuclear desalination has been identified as an option since the 1960s, but only recently, as climate change intensifies, has it gained interest again. Although environmental impacts of nuclear desalination have not been paid a lot of attention in the few implemented projects, now more than ever, it is essential to provide an overview of their nature and magnitude. The gathered information and basic analysis allow for a general comparison of a 200,000 m(3)/d nuclear desalination facility using a once-through cooling system as a reference case, with alternative co-location options. Results of the review indicate that the potential for marine impacts requires careful planning and monitoring. They also reveal that adverse coastal, atmospheric and socio-economic impacts are minor in comparison with other co-location alternatives. The issues regarding public health are discussed and experiences presented. Nuclear desalination facilities are expected to show a better environmental performance than other co-located power/desalination options. Environmental planning and monitoring activities are thus much simpler and their scope smaller, with the most important monitoring parameters listed. In conclusion, the application of nuclear desalination is recommended as a less environmentally harmful option.

  11. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, M.Y.; Shields, K.D.

    1999-04-02

    The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, PNNL-operated facilities are referred to as Balance-of-Plant (BOP) facilities. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R and D. R and D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in the FEMP.

  12. Y-12 Groundwater Protection Program Monitoring Optimization Plan For Groundwater Monitoring Wells At The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2013-09-01

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted "active" status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells granted "inactive" status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans. This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes.

  13. Effect of Acuros XB algorithm on monitor units for stereotactic body radiotherapy planning of lung cancer.

    Science.gov (United States)

    Khan, Rao F; Villarreal-Barajas, Eduardo; Lau, Harold; Liu, Hong-Wei

    2014-01-01

    Stereotactic body radiotherapy (SBRT) is a curative regimen that uses hypofractionated radiation-absorbed dose to achieve a high degree of local control in early stage non-small cell lung cancer (NSCLC). In the presence of heterogeneities, the dose calculation for the lungs becomes challenging. We have evaluated the dosimetric effect of the recently introduced advanced dose-calculation algorithm, Acuros XB (AXB), for SBRT of NSCLC. A total of 97 patients with early-stage lung cancer who underwent SBRT at our cancer center during last 4 years were included. Initial clinical plans were created in Aria Eclipse version 8.9 or prior, using 6 to 10 fields with 6-MV beams, and dose was calculated using the anisotropic analytic algorithm (AAA) as implemented in Eclipse treatment planning system. The clinical plans were recalculated in Aria Eclipse 11.0.21 using both AAA and AXB algorithms. Both sets of plans were normalized to the same prescription point at the center of mass of the target. A secondary monitor unit (MU) calculation was performed using commercial program RadCalc for all of the fields. For the planning target volumes ranging from 19 to 375cm(3), a comparison of MUs was performed for both set of algorithms on field and plan basis. In total, variation of MUs for 677 treatment fields was investigated in terms of equivalent depth and the equivalent square of the field. Overall, MUs required by AXB to deliver the prescribed dose are on an average 2% higher than AAA. Using a 2-tailed paired t-test, the MUs from the 2 algorithms were found to be significantly different (p algorithms.

  14. [Monitoring of a HACCP (Hazard Analysis Critical Control Point) plan for Listeria monocytogenes control].

    Science.gov (United States)

    Mengoni, G B; Apraiz, P M

    2003-01-01

    The monitoring of a HACCP (Hazard Analysis Critical Control Point) plan for the Listeria monocytogenes control in the cooked and frozen meat section of a thermo-processing meat plant was evaluated. Seventy "non-product-contact" surface samples and fourteen finished product samples were examined. Thirty eight positive sites for the presence of Listeria sp. were obtained. Twenty-two isolates were identified as L. monocytogenes, two as L. seeligeri and fourteen as L. innocua. Non isolates were obtained from finished product samples. The detection of L. monocytogenes in cooked and frozen meat section environment showed the need for the HACCP plan to eliminate or prevent product contamination in the post-thermal step.

  15. Reliability-Based Design and Planning of Inspection and Monitoring of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Marquez-Dominguez, Sergio

    Maintaining and developing a sustainable wind industry is the main motivation of this PhD thesis entitled “Reliability-based design and planning of inspection and monitoring of offshore wind turbines”. In this thesis, statistical methods and probability theory are important mathematical tools used...... and offshore wind turbine foundations with the aim of improving the design, decreasing structural costs and increasing benefits. Recently, wind energy technology has started to adopt risk and reliability based inspection planning (RBI) as a methodology based on Bayesian decision theories together...... produced by the natural phenomena, i.e. wind and waves. This load interaction has an important influence on the dynamical behaviour as well as on the fatigue damage of the wind turbine structure, influencing its reliability and stability. In summation, wind, currents and sea loads can be considered...

  16. Monitoring plan for vegetation responses to elk management in Rocky Mountain National Park

    Science.gov (United States)

    Zeigenfuss, Linda C.; Johnson, Therese L.; Wiebe, Zachary

    2011-01-01

    Rocky Mountain National Park (RMNP) in north-central Colorado supports numerous species of wildlife, including several large ungulate species among which Rocky Mountain elk (Cervus elaphus) are the most abundant. Elk are native to RMNP but were extirpated from the area by the late 1800s. They were reintroduced to the area in 1913-1914, and the elk herd grew to the point that it was actively managed from 1944 until 1968. In 1969, the active control of elk was discontinued and since then the herd has increased to a high point ranging from 2,800 to 3,500 between 1997 and 2001. In recent years, there has been growing concern over the condition of vegetation in the park and conflicts between elk and humans, both inside and outside the park. In response to these concerns, RMNP implemented an Elk and Vegetation Management Plan (EVMP) in 2009 to guide management actions in the park over a 20-year time period with the goal of reducing the impacts of elk on vegetation and restoring the natural range of variability in the elk population and affected plant and animal communities. The EVMP outlines the desired future condition for three vegetation communities where the majority of elk herbivory impacts are being observed: aspen, montane riparian willow, and upland herbaceous communities. The EVMP incorporates the principle of adaptive management whereby the effectiveness of management actions is assessed and adjusted as needed to successfully achieve objectives. Determination of whether vegetation objectives are being achieved requires monitoring and evaluation of target vegetation communities. The current report describes the design and implementation of a vegetation-monitoring program to help RMNP managers assess the effectiveness of their management actions and determine when and where to alter actions to achieve the EVMP's vegetation objectives. This monitoring plan details the process of selecting variables to be monitored, overall sampling design and structure, site

  17. Vision 20/20: Positron emission tomography in radiation therapy planning, delivery, and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Parodi, Katia, E-mail: Katia.parodi@physik.uni-muenchen.de [Faculty of Physics, Department of Medical Physics, Ludwig Maximilians University Munich, Munich 85748 (Germany)

    2015-12-15

    Positron emission tomography (PET) is increasingly considered as an effective imaging method to support several stages of radiation therapy. The combined usage of functional and morphological imaging in state-of-the-art PET/CT scanners is rapidly emerging to support the treatment planning process in terms of improved tumor delineation, and to assess the tumor response in follow-up investigations after or even during the course of fractionated therapy. Moreover, active research is being pursued on new tracers capable of providing different insights into tumor function, in order to identify areas of the planning volume which may require additional dosage for improved probability of tumor control. In this respect, major progresses in the next years will likely concern the development and clinical investigation of novel tracers and image processing techniques for reliable thresholding and segmentation, of treatment planning and beam delivery approaches integrating the PET imaging information, as well as improved multimodal clinical instrumentation such as PET/MR. But especially in the rapidly emerging case of ion beam therapy, the usage of PET is not only limited to the imaging of external tracers injected to the patient. In fact, a minor amount of positron emitters is formed in nuclear fragmentation reactions between the impinging ions and the tissue, bearing useful information for confirmation of the delivered treatment during or after therapeutic irradiation. Different implementations of unconventional PET imaging for therapy monitoring are currently being investigated clinically, and major ongoing research aims at new dedicated detector technologies and at challenging applications such as real-time imaging and time-resolved in vivo verification of motion compensated beam delivery. This paper provides an overview of the different areas of application of PET in radiation oncology and discusses the most promising perspectives in the years to come for radiation therapy

  18. Planning and Monitoring of Urban Development: The Role of the Housing Price Index

    Directory of Open Access Journals (Sweden)

    Tomi Deutsch

    2016-01-01

    Full Text Available In this paper the real estate market in Slovenia and selected Slovenian city municipalities is analyzed with the goal of establishing whether or not it is possible to use the Housing Price Index as an indicator of urban development. The analysis shows that the real estate market in the Slovenian city municipalities has in recent decades been subject to a number of changes with a long-term effect. The analysis further proves that under certain conditions the Housing Price Index can serve as one of the indicators policy makers could use in planning and monitoring of urban development.

  19. Draft Plan to Develop Non-Intrusive Load Monitoring Test Protocols

    Energy Technology Data Exchange (ETDEWEB)

    Mayhorn, Ebony T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sullivan, Greg P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Petersen, Joseph M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-29

    This document presents a Draft Plan proposed to develop a common test protocol that can be used to evaluate the performance requirements of Non-Intrusive Load Monitoring. Development on the test protocol will be focused on providing a consistent method that can be used to quantify and compare the performance characteristics of NILM products. Elements of the protocols include specifications for appliances to be used, metrics, instrumentation, and a procedure to simulate appliance behavior during tests. In addition, three priority use cases for NILM will be identified and their performance requirements will specified.

  20. An experimental quality control related to the regional monitoring plan against Aedes albopticus (tiger-mosquito

    Directory of Open Access Journals (Sweden)

    Samantha Morelli

    2009-06-01

    Full Text Available Following the epidemic disease caused by the Chikungunya virus detected in the Provinces of Romagna during 2007, a specific monitoring-plan against the bug-vector Aedes albopticus was set up by the Agenzia Regionale Prevenzione e Ambiente dell’Emilia Romagna (ARPA in the he Emilia-Romagna region (Italy. The analytical method consisted in the simple enumeration of the mosquitoes eggs spawned on a appropriate substratum, using an optic microscope.The aim of this study was to guarantee data comparability among the several laboratories involved in the project. Using the Analysis of Variance (ANOVA, homogeneous and comparable analytical data were emphasised.

  1. Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. Brent; Smith, Ronald M.; Chou, Charissa J.

    2000-11-28

    The 216-B-3 Pond was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In 1990, groundwater monitoring at B Pond was elevated from "detection" to assessment status because total organic halides and total organic carbon were found to exceed critical means in two wells. Groundwater quality assessment, which ended in 1996, failed to find any specific hazardous waste contaminant that could have accounted for the isolated occurrences of elevated total organic halides and total organic carbon. Hence, the facility was subsequently returned to detection-level monitoring in 1998. Exhaustive groundwater analyses during the assessment period indicated that only two contaminants, tritium and nitrate, could be positively attributed to the B Pond System, with two others (arsenic and I-129) possibly originating from B Pond. Chemical and radiological analyses of soil at the main pond and 216-B-3-3 ditch has not revealed significant contamination. Based on the observed, minor contamination in groundwater and in the soil column, three parameters were selected for site-specific, semiannual monitoring; gross alpha, gross beta, and specific conductance. Total organic halides and total organic carbon are included as constituents because of regulatory requirements. Nitrate, tritium, arsenic, and iodine-129 will be monitored under the aegis of Hanford site-wide monitoring. Although the B Pond System is not scheduled to advance from RCRA interim status to final status until the year 2003, a contingency plan for an improved monitoring strategy, which will partially emulate final status requirements, will be contemplated before the official change to final status. This modification will allow a more sensible and effective screening of groundwater for the facility.

  2. Plan for the performance monitoring of solar systems installed by the SUIEDE program: NCAT/SUEDE interaction

    Energy Technology Data Exchange (ETDEWEB)

    Hopkins, M

    1979-02-01

    The SUEDE Grantee solar system installation programs were reviewed to determine the type, number, and quality of Grantee-installed solar systems available for monitoring consideration. An NCAT Performance Monitoring Plan is presented which identifies the service and technical assistance that NCAT will need to provide based on the Grantee review. (MHR)

  3. NASA's Plans for Developing Life Support and Environmental Monitoring and Control Systems

    Science.gov (United States)

    Lawson, B. Michael; Jan, Darrell

    2006-01-01

    Life Support and Monitoring have recently been reworked in response to the Vision for Space Exploration. The Exploration Life Support (ELS) Project has replaced the former Advanced Life Support Element of the Human Systems Research and Technology Office. Major differences between the two efforts include: the separation of thermal systems into a new stand alone thermal project, deferral of all work in the plant biological systems, relocation of food systems to another organization, an addition of a new project called habitation systems, and overall reduction in the number of technology options due to lower funding. The Advanced Environmental Monitoring and Control (AEMC) Element is retaining its name but changing its focus. The work planned in the ELS and AEMC projects is organized around the three major phases of the Exploration Program. The first phase is the Crew Exploration Vehicle (CEV). The ELS and AEMC projects will develop hardware for this short duration orbital and trans-lunar vehicle. The second phase is sortie landings on the moon. Life support hardware for lunar surface access vehicles including upgrades of the CEV equipment and technologies which could not be pursued in the first phase due to limited time and budget will be developed. Monitoring needs will address lunar dust issues, not applicable to orbital needs. The ELS and AEMC equipment is of short duration, but has different environmental considerations. The third phase will be a longer duration lunar outpost. This will consist of a new set of hardware developments better suited for long duration life support and associated monitoring needs on the lunar surface. The presentation will show the planned activities and technologies that are expected to be developed by the ELS and AEMC projects for these program phases.

  4. Performance Assessment Monitoring Plan for the Hanford Site Low Level Waste Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    SONNICHSEN, J.C.

    2000-11-15

    As directed by the U.S. Department of Energy (DOE), Richland Operations Office (DOE-RL), Fluor Hanford, Inc. will implement the requirements of DOE Order 435.1, Radioactive Waste Management, as the requirements relate to the continued operation of the low-level waste disposal facilities on the Hanford Site. DOE Order 435.1 requires a disposal authorization statement authorizing operation (or continued operation) of a low-level waste disposal facility. The objective of this Order is to ensure that all DOE radioactive waste is managed in a manner that protects the environment and personnel and public health and safety. The manual (DOE Order 435.1 Manual) implementing the Order states that a disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980 documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility. Failure to obtain a disposal authorization statement shall result in shutdown of an operational disposal facility. In fulfillment of the requirements of DOE Order 435.1, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area and the 200 West Area Low-Level Burial Grounds. The disposal authorization statement constitutes approval of the performance assessment and composite analysis, authorizes operation of the facility, and includes conditions that the disposal facility must meet. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area Low-Level Burial Grounds be written and approved by the DOE-RL. The monitoring plan is to be updated and implemented within 1 year following issuance of the disposal authorization statement to

  5. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  6. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-04-01

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells granted “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.

  7. T Tank Farm Interim Surface Barrier Demonstration--Vadose Zone Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F.; Keller, Jason M.; Strickland, Christopher E.

    2007-04-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim barrier on the surface. Such a barrier is expected to prevent infiltrating water from reaching the plume and moving it further. A plan has been prepared to monitor and determine the effectiveness of the interim surface barrier. Soil water content and water pressure will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests were installed. Each instrument nest contains a neutron probe access tube, a capacitance probe, four heat-dissipation units, and a drain gauge to measure soil water flux. A meteorological station has been installed outside of the fence. In fiscal year 2007, two additional instrument nests are planned to be installed beneath the proposed barrier.

  8. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, Marcel Y.; Gervais, Todd L.

    2004-11-15

    The Pacific Northwest National Laboratory (PNNL) operates a number of Research & Development (R&D) facilities for the U.S. Department of Energy (DOE) on the Hanford Site. Facility effluent monitoring plans (FEMPs) have been developed to document the facility effluent monitoring portion of the Environmental Monitoring Plan (DOE 2000) for the Hanford Site. Three of PNNL’s R&D facilities, the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling, and individual FEMPs were developed for these facilities in the past. In addition, a balance-of-plant (BOP) FEMP was developed for all other DOE-owned, PNNL-operated facilities at the Hanford Site. Recent changes, including shutdown of buildings and transition of PNNL facilities to the Office of Science, have resulted in retiring the 3720 FEMP and combining the 331 FEMP into the BOP FEMP. This version of the BOP FEMP addresses all DOE-owned, PNNL-operated facilities at the Hanford Site, excepting the Radiochemical Processing Laboratory, which has its own FEMP because of the unique nature of the building and operations. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R&D. R&D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in Appendix A. Potential radioactive airborne emissions in the BOP facilities are estimated annually using a building inventory-based approach provided in federal regulations. Sampling at individual BOP facilities is based on a potential-to-emit assessment. Some of these facilities are considered minor emission points and thus are sampled routinely, but not continuously, to confirm the low emission potential. One facility, the 331 Life Sciences Laboratory, has a major emission point and is sampled continuously. Sampling systems are

  9. Groundwater level monitoring sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This Sampling and Analysis Plan addresses groundwater level monitoring activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Groundwater level monitoring will be conducted at 129 sites within the WAG. All of the sites will be manually monitored on a semiannual basis. Forty-five of the 128 wells, plus one site in White Oak Lake, will also be equipped with automatic water level monitoring equipment. The 46 sites are divided into three groups. One group will be equipped for continuous monitoring of water level, conductivity, and temperature. The other two groups will be equipped for continuous monitoring of water level only. The equipment will be rotated between the two groups. The data collected from the water level monitoring will be used to support determination of the contaminant flux at WAG 6.

  10. Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Steward, Cleveland R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing wild

  11. Participatory Planning, Monitoring and Evaluation of Multi-Stakeholder Platforms in Integrated Landscape Initiatives.

    Science.gov (United States)

    Kusters, Koen; Buck, Louise; de Graaf, Maartje; Minang, Peter; van Oosten, Cora; Zagt, Roderick

    2017-03-21

    Integrated landscape initiatives typically aim to strengthen landscape governance by developing and facilitating multi-stakeholder platforms. These are institutional coordination mechanisms that enable discussions, negotiations, and joint planning between stakeholders from various sectors in a given landscape. Multi-stakeholder platforms tend to involve complex processes with diverse actors, whose objectives and focus may be subjected to periodic re-evaluation, revision or reform. In this article we propose a participatory method to aid planning, monitoring, and evaluation of such platforms, and we report on experiences from piloting the method in Ghana and Indonesia. The method is comprised of three components. The first can be used to look ahead, identifying priorities for future multi-stakeholder collaboration in the landscape. It is based on the identification of four aspirations that are common across multi-stakeholder platforms in integrated landscape initiatives. The second can be used to look inward. It focuses on the processes within an existing multi-stakeholder platform in order to identify areas for possible improvement. The third can be used to look back, identifying the main outcomes of an existing platform and comparing them to the original objectives. The three components can be implemented together or separately. They can be used to inform planning and adaptive management of the platform, as well as to demonstrate performance and inform the design of new interventions.

  12. Monitoring outcomes for the Medicare Advantage program: methods and application of the VR-12 for evaluation of plans.

    Science.gov (United States)

    Kazis, Lewis E; Selim, Alfredo J; Rogers, William; Qian, Shirley X; Brazier, John

    2012-01-01

    The Veterans RAND 12-Item Health Survey (VR-12) is one of the major patient-reported outcomes for ranking the Medicare Advantage (MA) plans in the Health Outcomes Survey (HOS). Approaches for scoring physical and mental health are given using contemporary norms and regression estimators. A new metric approach for the VR-12 called the "VR-6D" is presented with case-mix adjustments for monitoring plans that combine utilities and mortality. Results show that the models for ranking health outcomes of the plans are robust and credible. Future directions include the use of utilities for evaluating and ranking of MA plans.

  13. An integrated approach to the Environmental Monitoring Plan of the Pertuso spring (Upper Valley of Aniene River

    Directory of Open Access Journals (Sweden)

    Giuseppe Sappa

    2014-06-01

    Full Text Available Quantitative assessment of groundwater and surface water is an important tool for sustainable management and protection of these important resources. This paper deals with the design of a multi-disciplinary monitoring plan related to the catchment project of the Pertuso spring, in the Upper Valley of Aniene River, which is going to be exploited to supply an important water network in the South part of Roma district. According to the Legislative Decree 152/2006, as modified by DM 260/2010, any infrastructure design should take in consideration an Environmental Monitoring Plan for the hydrogeological settings of the study area. Thus, the hydrogeological characterization combined with an Environmental Monitoring Plan provides to evaluate the potential adverse environmental impacts due catchment works. For water resources assessment and management, the quantification of groundwater recharge is a preliminary step. As a matter of fact, it has been included the quantitative characterization of the Pertuso spring, in the aim of to protect catchment area, which is directly affect by the natural hydrogeological balance of this aquifer. Thus, a multi-disciplinary monitoring plan has been set up, including quantitative and hydrogeochemical measurements, both for groundwater and surface water of the Upper Valley of Aniene River. The target of this Environmental Monitoring Plan is to set up the background framework on the hydromorphological, physico-chemical and biological properties of water resources in the water basin influenced aim by any potential environmental impact due to the construction activities. The Environmental Monitoring Plan and main features of the monitoring network will be presented in this study.

  14. Application for verification of monitor units of the treatment planning system; Aplicacion para la verificacion de unidades monitor del sistema de planificacion de tratamientos

    Energy Technology Data Exchange (ETDEWEB)

    Suero Rodrigo, M. A.; Marques Fraguela, E.

    2011-07-01

    Current estimates algorithms achieve acceptable degree of accuracy. However, operate on the basis of un intuitive models. It is therefore necessary to verify the calculation of monitor units of the treatment planning system (PTS) with those obtained by other independent formalisms. To this end, we have developed an application based on factorization formalism that automates the calculation of dose.

  15. Incorporating voltage security into the planning, operation and monitoring of restructured electric energy markets

    Science.gov (United States)

    Nair, Nirmal-Kumar

    As open access market principles are applied to power systems, significant changes are happening in their planning, operation and control. In the emerging marketplace, systems are operating under higher loading conditions as markets focus greater attention to operating costs than stability and security margins. Since operating stability is a basic requirement for any power system, there is need for newer tools to ensure stability and security margins being strictly enforced in the competitive marketplace. This dissertation investigates issues associated with incorporating voltage security into the unbundled operating environment of electricity markets. It includes addressing voltage security in the monitoring, operational and planning horizons of restructured power system. This dissertation presents a new decomposition procedure to estimate voltage security usage by transactions. The procedure follows physical law and uses an index that can be monitored knowing the state of the system. The expression derived is based on composite market coordination models that have both PoolCo and OpCo transactions, in a shared stressed transmission grid. Our procedure is able to equitably distinguish the impacts of individual transactions on voltage stability, at load buses, in a simple and fast manner. This dissertation formulates a new voltage stability constrained optimal power flow (VSCOPF) using a simple voltage security index. In modern planning, composite power system reliability analysis that encompasses both adequacy and security issues is being developed. We have illustrated the applicability of our VSCOPF into composite reliability analysis. This dissertation also delves into the various applications of voltage security index. Increasingly, FACT devices are being used in restructured markets to mitigate a variety of operational problems. Their control effects on voltage security would be demonstrated using our VSCOPF procedure. Further, this dissertation investigates

  16. T-TY Tank Farm Interim Surface Barrier Demonstration—Vadose Zone Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

    2010-09-27

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy’s Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

  17. Incorporating genetic sampling in long-term monitoring and adaptive management in the San Diego County Management Strategic Plan Area, Southern California

    Science.gov (United States)

    Vandergast, Amy G.

    2017-06-02

    Habitat and species conservation plans usually rely on monitoring to assess progress towards conservation goals. Southern California, USA, is a hotspot of biodiversity and home to many federally endangered and threatened species. Here, several regional multi-species conservation plans have been implemented to balance development and conservation goals, including in San Diego County. In the San Diego County Management Strategic Plan Area (MSPA), a monitoring framework for the preserve system has been developed with a focus on species monitoring, vegetation monitoring, threats monitoring and abiotic monitoring. Genetic sampling over time (genetic monitoring) has proven useful in gathering species presence and abundance data and detecting population trends, particularly related to species and threats monitoring objectives. This report reviews genetic concepts and techniques of genetics that relate to monitoring goals and outlines components of a genetic monitoring scheme that could be applied in San Diego or in other monitoring frameworks throughout the Nation.

  18. EMP Threats to US National Security: Congressional Responses

    Science.gov (United States)

    Huessy, Peter

    2011-04-01

    The US Congress is considering how best to respond to concerns that EMP is a real and present danger to US security. The threats come from a variety of areas: solar storms, non-nuclear EMP from man-made machines and devices; and nuclear EMP from a nuclear device exploded above CONUS or other critical areas important to the United States and its allies. Responses have to date included passage in the House of legislation to protect the electrical grid in the United States from such threats and hearings before the Homeland Security Committee. Additional efforts include examining missile defense responses, protection of the maritime domain, and hardening of US military and related civilian infrastructure. The House of Representatives has also examined what Europe, the European Union and NATO, both government and private industry, have done in these areas. Complicating matters are related issues of cyber-security and overall homeland security priorities.

  19. A cross-country Exchange Market Pressure (EMP) dataset.

    Science.gov (United States)

    Desai, Mohit; Patnaik, Ila; Felman, Joshua; Shah, Ajay

    2017-06-01

    The data presented in this article are related to the research article titled - "An exchange market pressure measure for cross country analysis" (Patnaik et al. [1]). In this article, we present the dataset for Exchange Market Pressure values (EMP) for 139 countries along with their conversion factors, ρ (rho). Exchange Market Pressure, expressed in percentage change in exchange rate, measures the change in exchange rate that would have taken place had the central bank not intervened. The conversion factor ρ can interpreted as the change in exchange rate associated with $1 billion of intervention. Estimates of conversion factor ρ allow us to calculate a monthly time series of EMP for 139 countries. Additionally, the dataset contains the 68% confidence interval (high and low values) for the point estimates of ρ's. Using the standard errors of estimates of ρ's, we obtain one sigma intervals around mean estimates of EMP values. These values are also reported in the dataset.

  20. Testing and monitoring plan for the permanent isolation surface barrier prototype

    Energy Technology Data Exchange (ETDEWEB)

    Gee, G.W.; Cadwell, L.L.; Freeman, H.D.; Ligotke, M.W.; Link, S.O.; Romine, R.A.; Walters, W.H. Jr.

    1993-06-01

    This document is a testing and monitoring plan for a prototype barrier to be constructed at the Hanford Site in 1993. The prototype barrier is an aboveground structure engineered to demonstrate the basic features of an earthen cover system, designed to permanently isolate waste from the biosphere. These features include multiple layers of soil and rock materials and a low-permeability asphalt sublayer. The surface of the barrier consists of silt loam soil, vegetated with plants. The barrier sides are reinforced with rock or coarse earthen-fill to protect against wind and water erosion. The sublayers inhibit plant and animal intrusion and percolation of water. A series of tests will be conducted on the prototype over the next several years to evaluate barrier performance under extreme climatic conditions.

  1. An innovative price plan monitoring and advisory system: A case study of mobile telecom service in Thailand

    Directory of Open Access Journals (Sweden)

    Manarach Amornrattanapaichit

    2014-04-01

    Full Text Available An innovative price plan monitoring and advisory system simulates subscriber usage consumption for offering suitable price plan. The aim of this paper is to develop the decision support system by using Statistical Process Control (SPC to identify subscriber usage behavior and provide critical visibility into subscriber consumption to detect their inappropriate usage especially in exceeding usage. To explore subscriber usage behavior, a forecasting model and a regression is employed to identify related factors and predictive usage model. The innovative price plan monitoring and advisory system has been verified and validated with one of the largest telecommunication company in Thailand. Using decision support system with effective control chart and real subscriber behavior pattern help mobile network operator grow their revenues and profits by offering an appropriate price plan as well as improve subscriber experience with more flexible choice to meet their individual usage consumption needs.

  2. Development and Validation of Pathogen Environmental Monitoring Programs for Small Cheese Processing Facilities.

    Science.gov (United States)

    Beno, Sarah M; Stasiewicz, Matthew J; Andrus, Alexis D; Ralyea, Robert D; Kent, David J; Martin, Nicole H; Wiedmann, Martin; Boor, Kathryn J

    2016-12-01

    Pathogen environmental monitoring programs (EMPs) are essential for food processing facilities of all sizes that produce ready-to-eat food products exposed to the processing environment. We developed, implemented, and evaluated EMPs targeting Listeria spp. and Salmonella in nine small cheese processing facilities, including seven farmstead facilities. Individual EMPs with monthly sample collection protocols were designed specifically for each facility. Salmonella was detected in only one facility, with likely introduction from the adjacent farm indicated by pulsed-field gel electrophoresis data. Listeria spp. were isolated from all nine facilities during routine sampling. The overall Listeria spp. (other than Listeria monocytogenes ) and L. monocytogenes prevalences in the 4,430 environmental samples collected were 6.03 and 1.35%, respectively. Molecular characterization and subtyping data suggested persistence of a given Listeria spp. strain in seven facilities and persistence of L. monocytogenes in four facilities. To assess routine sampling plans, validation sampling for Listeria spp. was performed in seven facilities after at least 6 months of routine sampling. This validation sampling was performed by independent individuals and included collection of 50 to 150 samples per facility, based on statistical sample size calculations. Two of the facilities had a significantly higher frequency of detection of Listeria spp. during the validation sampling than during routine sampling, whereas two other facilities had significantly lower frequencies of detection. This study provides a model for a science- and statistics-based approach to developing and validating pathogen EMPs.

  3. Urban Fluxes Monitoring and Development of Planning Strategies to Reduce Ghg Emissions in AN European City

    Science.gov (United States)

    Marras, S.; Sirca, C.; Bellucco, V.; Falk, M.; Pyles, R. D.; Snyder, R. L.; Paw U, K.; Duce, P.; Blecic, I.; Trunfio, G. A.; Cecchini, A.; Spano, D.

    2013-12-01

    Cities and human settlements in general are a primary source of emissions that contribute to human-induced climate change. To investigate the impact of an urbanized area on urban metabolism components, an eddy covariance (EC) tower will be set up in a city (Sassari) located in the center of the Mediterranean basin (Sardinia, Italy). The EC tower, as well as a meteorological station and radiometers, will be set up to monitor energy, water, and carbon fluxes in the city center. A GHG emissions inventory will be also compiled to identify the main emission sources. In addition, a modeling framework will be used to study the impact of different urban planning strategies on carbon emission rates. The modeling framework consists of four models to analyze fluxes both at local and municipality scale: (i) a land surface model ACASA (Advanced Canopy-Atmosphere-Soil Algorithm, ACASA) to simulate the urban metabolism components at local scale; (ii) a Cellular Automata model to simulate the urban land-use dynamics in the near future (20-30 years); (iii) a transportation model to estimate the variation of the transportation network load, and (iv) the coupled model WRF-ACASA will be finally used to simulate the urban metabolism components at municipality scale. The participation of local stakeholders will allow the definition of future planning strategies with the aim to identify low carbon emissions strategies. The projects activities, methodologies applied, as well as the preliminary results will be reported here.

  4. Earth Observation in Support of Sustainable Urban Planning: Results of the Dragon-3 Monitor Project

    Science.gov (United States)

    Cartalis, C.; Polydoros, A.; Mavrakou, T.; Asimakopoulos, D. N.

    2016-08-01

    Sustainable urban planning increasingly demands innovative concepts and techniques to obtain up-to-date and area-wide information on the characteristics and development of the urban system. In this paper, a thorough and conclusive presentation is made in terms of the results of the DRAGON-3 MONITOR project as based on the use of Earth Observation. Results refer in particular to a set of EO based dynamic urban indicators (i.e. urban form and expansion, land use/land cover changes, land surface temperature distribution, the presence and strength of urban heat island) with the capacity to describe the state, dynamic changes and interaction of the land and thermal environment in urban areas. Furthermore results are assessed in terms of their potential to operationally support sustainable urban planning and bridge the gap between EO scientists and urban planners. Constraints related to the spatial resolution and revisit time of satellite sensors are discussed as they influence the accuracy and applicability of the indicators. Methodologies to improve the applicability of the indicators are also discussed along with the presentation of the respective results.

  5. Environmental assessment and planning at Mound - environmental monitoring capabilities and personnel profiles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Through its long experience with radioactive materials, Mound has developed a comprehensive, routine, offsite, environmental surveillance program to safeguard its employees, the physical plant, and the integrity of the surrounding environment from any potential adverse effects of its widely diverse operations. Effluent samples are analyzed for radiological and non-radiological parameters. The environment surrounding Mound Facility is continuously monitored - air, water, foodstuffs, vegetation, soil, and silt samples are analyzed to ensure that radioisotopic concentrations and other possible pollutants are well within the stringent standards adopted by the Department of Energy, the Environmental Protection Agencies (both federal and state), and various regional and local agencies. Moreover, this environmental surveillance program has been designed to ensure that the facility is designed, constructed, managed, operated, and maintained in a manner that continues to meet all federal, state, and local standards for environmental protection. Work in environmental science has been broadened to assess environmental factors associated with various aspects of the National Energy Plan. Both the management and staff at Mound have undertaken a firm commitment to make Mound`s environmental monitoring capabilities available to agencies that have the responsibility for the resolution of important environmental issues.

  6. NOAA's Role in Sustaining Global Ocean Observations: Future Plans for OAR's Ocean Observing and Monitoring Division

    Science.gov (United States)

    Todd, James; Legler, David; Piotrowicz, Stephen; Raymond, Megan; Smith, Emily; Tedesco, Kathy; Thurston, Sidney

    2017-04-01

    The Ocean Observing and Monitoring Division (OOMD, formerly the Climate Observation Division) of the National Oceanic and Atmospheric Administration (NOAA) Climate Program Office provides long-term, high-quality global observations, climate information and products for researchers, forecasters, assessments and other users of environmental information. In this context, OOMD-supported activities serve a foundational role in an enterprise that aims to advance 1) scientific understanding, 2) monitoring and prediction of climate and 3) understanding of potential impacts to enable a climate resilient society. Leveraging approximately 50% of the Global Ocean Observing System, OOMD employs an internationally-coordinated, multi-institution global strategy that brings together data from multiple platforms including surface drifting buoys, Argo profiling floats, flux/transport moorings (RAMA, PIRATA, OceanSITES), GLOSS tide gauges, SOOP-XBT and SOOP-CO2, ocean gliders and repeat hydrographic sections (GO-SHIP). OOMD also engages in outreach, education and capacity development activities to deliver training on the social-economic applications of ocean data. This presentation will highlight recent activities and plans for 2017 and beyond.

  7. Plasminogen activator inhibitor-1 fused with erythropoietin (EPO) mimetic peptide (EMP) enhances the EPO activity of EMP.

    Science.gov (United States)

    Kuai, L; Wu, C; Qiu, Q; Zhang, J; Zhou, A; Wang, S; Zhang, H; Song, Q; Liao, S; Han, Y; Liu, J; Ma, Z

    2000-08-01

    Erythropoietin (EPO) mimetic peptide (EMP) encoding sequence was inserted into the gene of plasminogen activator inhibitor-1 (PAI-1) between Ala348 and Pro349 (P2'-P3'), generating a novel gene, PAI-1/EMP (PMP). This was cloned into pET32a expression vector, fused with TrxA peptide in the vector, and a 63-kDa protein was expressed in inclusion bodies with an expression level >50%. The TrxA/PMP protein was purified by Ni-NTA-agarose metal-ligand affinity chromatography to a purity >90%, showing a single, silver-stained band on SDS-PAGE. Using a reticulocyte counting assay, the EPO activity of PMP was determined to be 5,000 IU/mg, 2,500-fold that of EMP.

  8. Seeps and springs sampling and analysis plan for the environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and operated by Martin Marietta Energy Systems, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources.

  9. EMP Shielding Properties of Conduit Systems and Related Hardware

    Science.gov (United States)

    1975-06-01

    degradation in performance. An integral part of this EMP-shielding system is the condut runs that carry the instrumentation and power cables between the...Practically, however, heat loss from the chamber combined with the thermal inertia of the chamber and thermostat cause these values to vary with time. These

  10. Protection of Medical Equipment against Electromagnetic Pulse (EMP): phase I

    Science.gov (United States)

    1986-06-12

    characteriitic associated with a typical EMP pin threat. This pin threat can be s ecified either as a damped sine wave or a rectangular pulse having a short ...Spectrophotometer, Stasar ............................... 77 7.12 Opthalmic Diathermy , TR 3000 ........................... 80 7.13 Birtcher 771 Micro...Opthalmic Diathermy TR 3000 ............................................. 82 7.12b Opthalmic Diathermy TR 3000 ................................... 83 7.13

  11. Baseline and Postremediation Monitoring Program Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report was prepared in accordance with CERCLA requirements to present the plan for baseline and postremediation monitoring as part of the selected remedy. It provides the Environmental Restoration Program with information about the requirements to monitor for soil and terrestrial biota in the Lower East Fork Poplar Creek (LEFPC) floodplain; sediment, surface water, and aquatic biota in LEFPC; wetland restoration in the LEFPC floodplain; and human use of shallow groundwater wells in the LEFPC floodplain for drinking water. This document describes the monitoring program that will ensure that actions taken under Phases I and II of the LEFPC remedial action are protective of human health and the environment.

  12. 78 FR 13712 - U.S. Nuclear Regulatory Commission Planned Monitoring Activities for F-Area Tank Farm at the...

    Science.gov (United States)

    2013-02-28

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION U.S. Nuclear Regulatory Commission Planned Monitoring Activities for F-Area Tank Farm at the Savannah River Site, Revision 0 AGENCY: Nuclear Regulatory Commission. ACTION: Document issuance....

  13. Steroid hormone regulation of EMP2 expression and localization in the endometrium

    Directory of Open Access Journals (Sweden)

    Williams Carmen J

    2008-04-01

    Full Text Available Abstract Background The tetraspan protein epithelial membrane protein-2 (EMP2, which mediates surface display of diverse proteins, is required for endometrial competence in blastocyst implantation, and is uniquely correlated with poor survival from endometrial adenocarcinoma tumors. Because EMP2 is differentially expressed in the various stages of the murine and human estrous cycle, we tested the hypothesis that the steroid hormones progesterone and estrogen influence EMP2 expression and localization. Methods Frozen human proliferative and secretory endometrium were collected and analyzed for EMP2 expression using SDS-PAGE/Western blot analysis. The response of EMP2 to progesterone and estradiol was determined using a combination of real-time PCR, SDS-PAGE/Western blot analysis, and confocal immunofluorescence in the human endometrial carcinoma cell line RL95-2. To confirm the in vitro results, ovariectomized mice were treated with progesterone or estradiol, and EMP2 expression was analyzed using immunohistochemistry. Results Within normal human endometrium, EMP2 expression is upregulated in the secretory phase relative to the proliferative phase. To understand the role of steroid hormones on EMP2 expression, we utilized RL95-2 cells, which express both estrogen and progesterone receptors. In RL95-2 cells, both estradiol and progesterone induced EMP2 mRNA expression, but only progesterone induced EMP2 protein expression. To compare steroid hormone regulation of EMP2 between humans and mice, we analyzed EMP2 expression in ovarectomized mice. Similar to results observed in humans, progesterone upregulated endometrial EMP2 expression and induced EMP2 translocation to the plasma membrane. Estradiol did not promote translocation to the cell surface, but moderately induced EMP2 expression in cytoplasmic compartments in vivo. Conclusion These findings suggest that targeting of EMP2 to specific locations under the influence of these steroid hormones may

  14. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs.

  15. Web Based GIS System For Monitoring the Implementation of County Integrated Development Plan a Case Study of Nandi County, Kenya.

    Science.gov (United States)

    Kurui, P. K.; Mutua, F.

    2016-12-01

    The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.

  16. Environmental radiation monitoring plan for depleted uranium and beryllium areas, Yuma Proving Ground

    Energy Technology Data Exchange (ETDEWEB)

    Ebinger, M.H.; Hansen, W.R.

    1994-05-11

    This Environmental Radiation Monitoring Plan (ERM) discusses sampling soils, vegetation, and biota for depleted uranium (DU) and beryllium (Be) at Yuma Proving Ground (YPG). The existing ERM plan was used and modified to more adequately assess the potential of DU and Be migration through the YPG ecosystem. The potential pathways for DU and Be migration are discussed and include soil to vegetation, soil to animals, vegetation to animals, animals to animals, and animals to man. Sample collection will show DU deposition and will be used to estimate DU migration. The number of samples from each area varies and depends on if the firing range of interest is currently used for DU testing (GP 17A) or if the range is not used currently for DU testing (GP 20). Twenty to thirty-five individual mammals or lizards will be sampled from each transect. Air samples and samples of dust in the air fall will be collected in three locations in the active ranges. Thirty to forty-five sediment samples will be collected from different locations in the arroys near the impact areas. DU and Be sampling in the Hard Impact and Soft Impact areas changed only slightly from the existing ERM. The modifications are changes in sample locations, addition of two sediment transport locations, addition of vegetation samples, mammal samples, and air sampling from three to five positions on the impact areas. Analysis of samples for DU or total U by inductively-coupled mass spectroscopy (ICP/MS), cc spectroscopy, neutron activation analysis (NAA), and kinetic phosphorimetric analysis (KPA) are discussed, and analysis for Be by ICP/MS are recommended. Acquiring total U (no isotope data) from a large number of samples and analysis of those samples with relatively high total U concentrations results in fewer isotopic identifications but more information on U distribution. From previous studies, total U concentrations greater than about 3 times natural background are usually DU by isotopic confirmation.

  17. Utility of the theory of planned behavior to predict nursing staff blood pressure monitoring behaviours.

    Science.gov (United States)

    Nelson, Joan M; Cook, Paul F; Ingram, Jennifer C

    2014-02-01

    To evaluate constructs from the theory of planned behavior (TPB, Ajzen 2002) - attitudes, sense of control, subjective norms and intentions - as predictors of accuracy in blood pressure monitoring. Despite numerous initiatives aimed at teaching blood pressure measurement techniques, many healthcare providers measure blood pressures incorrectly. Descriptive, cohort design. Medical assistants and licensed practical nurses were asked to complete a questionnaire on TPB variables. These nursing staff's patients had their blood pressures measured and completed a survey about techniques used to measure their blood pressure. We correlated nursing staff's responses on the TBP questionnaire with their intention to measure an accurate blood pressure and with the difference between their actual blood pressure measurement and a second measurement taken by a researcher immediately after the clinic visit. Patients' perceptions of MAs' and LPNs' blood pressure measurement techniques were examined descriptively. Perceived control and social norm predicted intention to measure an accurate blood pressure, with a negative relationship between knowledge and intention. Consistent with the TPB, intention was the only significant predictor of blood pressure measurement accuracy. Theory of planned behavior constructs predicted the healthcare providers' intention to measure blood pressure accurately and intention predicted the actual accuracy of systolic blood pressure measurement. However, participants' knowledge about blood pressure measurement had an unexpected negative relationship with their intentions. These findings have important implications for nursing education departments and organisations which traditionally invest significant time and effort in annual competency training focused on knowledge enhancement by staff. This study suggests that a better strategy might involve efforts to enhance providers' intention to change, particularly by changing social norms or increasing

  18. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).

  19. Comparison of bird community indices for riparian restoration planning and monitoring

    Science.gov (United States)

    Young, Jock S.; Ammon, Elisabeth M.; Weisburg, Peter J.; Dilts, Thomas E.; Newton, Wesley E.; Wong-Kone, Diane C.; Heki, Lisa G.

    2013-01-01

    The use of a bird community index that characterizes ecosystem integrity is very attractive to conservation planners and habitat managers, particularly in the absence of any single focal species. In riparian areas of the western USA, several attempts at arriving at a community index signifying a functioning riparian bird community have been made previously, mostly resorting to expert opinions or national conservation rankings for species weights. Because extensive local and regional bird monitoring data were available for Nevada, we were able to develop three different indices that were derived empirically, rather than from expert opinion. We formally examined the use of three species weighting schemes in comparison with simple species richness, using different definitions of riparian species assemblage size, for the purpose of predicting community response to changes in vegetation structure from riparian restoration. For the three indices, species were weighted according to the following criteria: (1) the degree of riparian habitat specialization based on regional data, (2) the relative conservation ranking of landbird species, and (3) the degree to which a species is under-represented compared to the regional species pool for riparian areas. To evaluate the usefulness of these indices for habitat restoration planning and monitoring, we modeled them using habitat variables that are expected to respond to riparian restoration efforts, using data from 64 sampling sites in the Walker River Basin in Nevada and California. We found that none of the species-weighting schemes performed any better as an index for evaluating overall habitat condition than using species richness alone as a community index. Based on our findings, the use of a fairly complete list of 30–35 riparian specialists appears to be the best indicator group for predicting the response of bird communities to the restoration of riparian vegetation.

  20. 76 FR 4120 - The National Antimicrobial Resistance Monitoring System Strategic Plan 2011-2015; Request for...

    Science.gov (United States)

    2011-01-24

    ... HUMAN SERVICES Food and Drug Administration The National Antimicrobial Resistance Monitoring System... public comment of a document for The National Antimicrobial Resistance Monitoring System (NARMS) entitled... systems monitoring antimicrobial resistance in other countries. Foodborne diseases are an important cause...

  1. Los Alamos National Laboratory emergency management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  2. Improving health aid for a better planet: The planning, monitoring and evaluation tool (PLANET).

    Science.gov (United States)

    Sridhar, Devi; Car, Josip; Chopra, Mickey; Campbell, Harry; Woods, Ngaire; Rudan, Igor

    2015-12-01

    International development assistance for health (DAH) quadrupled between 1990 and 2012, from US$ 5.6 billion to US$ 28.1 billion. This generates an increasing need for transparent and replicable tools that could be used to set investment priorities, monitor the distribution of funding in real time, and evaluate the impact of those investments. In this paper we present a methodology that addresses these three challenges. We call this approach PLANET, which stands for planning, monitoring and evaluation tool. Fundamentally, PLANET is based on crowdsourcing approach to obtaining information relevant to deployment of large-scale programs. Information is contributed in real time by a diverse group of participants involved in the program delivery. PLANET relies on real-time information from three levels of participants in large-scale programs: funders, managers and recipients. At each level, information is solicited to assess five key risks that are most relevant to each level of operations. The risks at the level of funders involve systematic neglect of certain areas, focus on donor's interests over that of program recipients, ineffective co-ordination between donors, questionable mechanisms of delivery and excessive loss of funding to "middle men". At the level of managers, the risks are corruption, lack of capacity and/or competence, lack of information and /or communication, undue avoidance of governmental structures / preference to non-governmental organizations and exclusion of local expertise. At the level of primary recipients, the risks are corruption, parallel operations / "verticalization", misalignment with local priorities and lack of community involvement, issues with ethics, equity and/or acceptability, and low likelihood of sustainability beyond the end of the program's implementation. PLANET is intended as an additional tool available to policy-makers to prioritize, monitor and evaluate large-scale development programs. In this, it should complement

  3. A randomized phase II trial of personalized peptide vaccine plus low dose estramustine phosphate (EMP) versus standard dose EMP in patients with castration resistant prostate cancer.

    Science.gov (United States)

    Noguchi, Masanori; Kakuma, Tatsuyuki; Uemura, Hirotsugu; Nasu, Yasutomo; Kumon, Hiromi; Hirao, Yasuhiko; Moriya, Fukuko; Suekane, Shigetaka; Matsuoka, Kei; Komatsu, Nobukazu; Shichijo, Shigeki; Yamada, Akira; Itoh, Kyogo

    2010-07-01

    Personalized peptide vaccination (PPV) combined with chemotherapy could be a novel approach for many cancer patients. In this randomized study, we evaluated the anti-tumor effect and safety of PPV plus low-dose estramustine phosphate (EMP) as compared to standard-dose EMP for HLA-A2- or -A24-positive patients with castration resistant prostate cancer. Patients were randomized into groups receiving either PPV plus low-dose EMP (280 mg/day) or standard-dose EMP (560 mg/day). After disease progression, patients were switched to the opposite regime. The primary end point was progression-free survival (PFS). We randomly assigned 28 patients to receive PPV plus low-dose EMP and 29 patients to receive standard-dose EMP. Nineteen events in the PPV group and 20 events in the EMP group occurred during the first treatment. Median PFS for the first treatment was 8.5 months in the PPV group and 2.8 months in the EMP group with a hazard ratio (HR) of 0.28 (95% CI, 0.14-0.61; log-rank P = 0.0012), while there was no difference for median PFS for the second treatment. The HR for overall survival was 0.3 (95% CI, 0.1-0.91) in favor of the PPV plus low-dose EMP group (log-rank, P = 0.0328). The PPV plus low-dose EMP was well tolerated without major adverse effects and with increased levels of IgG and cytotoxic-T cell responses to the vaccinated peptides. PPV plus low-dose EMP was associated with an improvement in PSA-based PFS as compared to the standard-dose EMP alone.

  4. INFORMATION SYSTEM FOR PLANNING, ACCOUNTING, MONITORING AND MANAGEMENT OF INNOVATION IN THE UKRAINIAN HEALTH CARE SPHERE

    Directory of Open Access Journals (Sweden)

    A. E. Gorban

    2016-06-01

    Full Text Available Each year, research teams of organizations, institutions and enterprises from the sphere of the Ministry of Public Health (MPH of Ukraine carried out more than 200 scientific research works (SRW, the results of which creates innovative products (new method, a technique, a compound device, and the like. Growth in the medical information obtained in the performance of SRW results in the need to speed up the processing and transfer of innovation activity agents. This problem can be effectively addressed through the use of automated information systems. Timely analysis of the incoming information, particularly at the planning stage of SRW, and forecasting its effectiveness permit to avoid mistakes in management decisions. In this regard, relevant and timely is the development of automated information systems and modern information technologies for collecting, processing and analyzing information. The article presents the scientific basis of development and the creation of an automated information system for recording, monitoring and forecasting of the effectiveness of innovation. The basic principles to be met by the developed system are systemic, development, interoperability, standardization and efficiency, data security and reliability, agility, visibility and intuitive user experience, ease of use and minimal sufficient of information support.

  5. Combining qualitative and quantitative spatial and temporal information in a hierarchical structure: Approximate reasoning for plan execution monitoring

    Science.gov (United States)

    Hoebel, Louis J.

    1993-01-01

    The problem of plan generation (PG) and the problem of plan execution monitoring (PEM), including updating, queries, and resource-bounded replanning, have different reasoning and representation requirements. PEM requires the integration of qualitative and quantitative information. PEM is the receiving of data about the world in which a plan or agent is executing. The problem is to quickly determine the relevance of the data, the consistency of the data with respect to the expected effects, and if execution should continue. Only spatial and temporal aspects of the plan are addressed for relevance in this work. Current temporal reasoning systems are deficient in computational aspects or expressiveness. This work presents a hybrid qualitative and quantitative system that is fully expressive in its assertion language while offering certain computational efficiencies. In order to proceed, methods incorporating approximate reasoning using hierarchies, notions of locality, constraint expansion, and absolute parameters need be used and are shown to be useful for the anytime nature of PEM.

  6. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Peelle, E.; Schweitzer, M.; Scharre, P.; Pressman, B.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possible through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.

  7. Monitoring of Literacy Programmes. Planning, Administration and Monitoring in Literacy; Portfolio of Literacy Materials, Series 2, Monograph 3.

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    The third of three related monographs resulting from a Unesco regional literacy workshop in Asia, this booklet provides information useful to those designing national programs in literacy training for underdeveloped and developing nations. The booklet is divided into four parts. The first part discusses the monitoring of literacy programs,…

  8. Epithelial membrane protein 2 (EMP2) deficiency alters placental angiogenesis, mimicking features of human placental insufficiency.

    Science.gov (United States)

    Williams, Carmen J; Chu, Alison; Jefferson, Wendy N; Casero, David; Sudhakar, Deepthi; Khurana, Nevil; Hogue, Claire P; Aryasomayajula, Chinmayi; Patel, Priya; Sullivan, Peggy; Padilla-Banks, Elizabeth; Mohandessi, Shabnam; Janzen, Carla; Wadehra, Madhuri

    2017-03-14

    Epithelial membrane protein-2 (EMP2) is a tetraspan protein predicted to regulate placental development. Highly expressed in secretory endometrium and trophectoderm cells, previous studies suggest that it may regulate implantation by orchestrating the surface expression of integrins and other membrane proteins. In order to test the role of EMP2 in pregnancy, mice lacking EMP2 (Emp2(-/-) ) were generated. Emp2(-/-) females are fertile but have reduced litter sizes when carrying Emp2(-/-) but not Emp2(+/-) fetuses. Placentas of Emp2(-/-) fetuses exhibit dysregulation in pathways related to neoangiogenesis, coagulation, and oxidative stress, and have increased fibrin deposition and altered vasculature. Given that these findings often occur due to placental insufficiency resulting in an oxygen-poor environment, the expression of hypoxia-inducible factor-1 alpha (HIF-1α) was examined. Placentas from Emp2(-/-) fetuses had increased total HIF-1α expression in large part through an increase in uterine NK (uNK) cells, demonstrating a unique interplay between uNK cells and trophoblasts modulated through EMP2. To determine if these results translated to human pregnancy, placentas from normal, term deliveries or those complicated by placental insufficiency resulting in intrauterine growth restriction (IUGR) were stained for EMP2. EMP2 was significantly reduced in both villous and extravillous trophoblast populations in IUGR placentas. Experiments in vitro using human trophoblast cells lines indicate that EMP2 modulates angiogenesis by altering HIF-1α expression. Our results reveal a novel role for EMP2 in regulating trophoblast function and vascular development in mice and humans and suggest it may be a new biomarker for placental insufficiency.

  9. Assessing teratogenicity of antiretroviral drugs: monitoring and analysis plan of the Antiretroviral Pregnancy Registry.

    Science.gov (United States)

    Covington, Deborah L; Tilson, Hugh; Elder, Jenna; Doi, Peggy

    2004-08-01

    This paper describes the Antiretroviral Pregnancy Registry's (APR) monitoring and analysis plan. APR is overseen by a committee of experts in obstetrics, pediatrics, teratology, infectious diseases, epidemiology and biostatistics from academia, government and the pharmaceutical industry. APR uses a prospective exposure-registration cohort design. Clinicians voluntarily register pregnant women with prenatal exposures to any antiretroviral therapy and provide fetal/neonatal outcomes. A birth defect is any birth outcome > or = 20 weeks gestation with a structural or chromosomal abnormality as determined by a geneticist. The prevalence is calculated by dividing the number of defects by the total number of live births and is compared to the prevalence in the CDC's population-based surveillance system. Additionally, first trimester exposures, in which organogenesis occurs, are compared with second/third trimester exposures. Statistical inference is based on exact methods for binomial proportions. Overall, a cohort of 200 exposed newborns is required to detect a doubling of risk, with 80% power and a Type I error rate of 5%. APR uses the Rule of Three: immediate review occurs once three specific defects are reported for a specific exposure. The likelihood of finding three specific defects in a cohort of < or = 600 by chance alone is less than 5% for all but the most common defects. To enhance the assurance of prompt, responsible, and appropriate action in the event of a potential signal, APR employs the strategy of 'threshold'. The threshold for action is determined by the extent of certainty about the cases, driven by statistical considerations and tempered by the specifics of the cases. Copyright 2004 John Wiley & Sons, Ltd.

  10. A Monitoring System for Mitigation Planning: The Case of "Bagnaschino" Landslide in Northern Italy

    Directory of Open Access Journals (Sweden)

    Giuliani Andrea

    2010-01-01

    Full Text Available Problem statement: The Bagnaschino landslide occurred in November 1994 that caused extensive floods and many landslides all over northern Italy. In southern Piedmont, the Casotto River (Cuneo Province damaged many kilometers of provincial road and the river was dammed by this landslide. The landslide involves an area of about 100 thousands m3, but a good knowledge of the landslide is however still missing because of the complexity of the phenomenon. Approach: The aim of this study has been to collect and reorganize available data with the georeferencing in a GIS project of the information taken from investigations of the last years. An electric tomography and seismic reflection were carried out above the landslide body to enrich the available data. The final goal has been to well-know the sliding surfaces and the different processes involved in the slope deformation. Results: The research has redefined the geological base model, that was been the local stratigraphy is represented by an heterogeneous deposit of loose materials (20-30 m, with abundant silty-clayey matrix. The bedrock is composed by fractured micashists, metabolites and green stones. The landslide has shown many surfaces of movement at different depths and continuous reactivations, but the triggering mechanism is still not clarified due to the complex geological setting. Conclusion: Rock masses observed in correspondence of the road and the river bed has suggested that the main sliding surface did not involve the lower part of the slope and that the road is built on stable bedrock. The intention will be to continue the monitoring of the landslide in order to give to the Local Authorities the correct instruments for planning mitigation projects.

  11. A management information system to plan and monitor the delivery of health-care services in government hospitals in India.

    Science.gov (United States)

    Ramani, K V

    2004-01-01

    Governments all over the world are getting increasingly concerned about their ability to meet their social obligations in the health sector. In this paper, we discuss the design and development of a management information system (MIS) to plan and monitor the delivery of healthcare services in government hospitals in India. Our MIS design is based on an understanding of the working of several municipal, district, and state government hospitals. In order to understand the magnitude and complexity of various issues faced by the government hospitals, we analyze the working of three large tertiary care hospitals administered by the Ahmedabad Municipal Corporation. The hospital managers are very concerned about the lack of hospital infrastructure and resources to provide a satisfactory level of service. Equally concerned are the government administrators who have limited financial resources to offer healthcare services at subsidized rates. A comprehensive hospital MIS is thus necessary to plan and monitor the delivery of hospital services efficiently and effectively.

  12. 强光环境也适用——Epson EMP-61/EMP-81

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    如果大家有需要在较亮的环境中投射大型的影像,一般家用的入门级投影机.因为亮度不太够.所以在早上室外光线能打入屋时未必够用,但Epson即将推出的这两部亮度和分辨率都较高的EMP-61/EMP-81就最适合这种环境下使用。两部投影机同时拥有高达2,000流明的高亮度.并分别拥有800×600和更高的1,024×758高

  13. 78 FR 58605 - Proposed Collection; Comment Request for Form 8453-EMP, Form 8453-F, Form 8453-FE, Form 8879-F...

    Science.gov (United States)

    2013-09-24

    ... Internal Revenue Service Proposed Collection; Comment Request for Form 8453-EMP, Form 8453-F, Form 8453-FE, Form 8879-F, and 8879-EMP. AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request...- file Return; Form 8453-EMP, Employment Tax Declaration for an IRS e- file Return; Form 8879-EMP, IRS...

  14. Missouri River Emergent Sandbar Habitat Monitoring Plan - A Conceptual Framework for Adaptive Management

    Science.gov (United States)

    Sherfy, Mark H.; Stucker, Jennifer H.; Anteau, Michael J.

    2009-01-01

    available to quantify changes in managed habitats for least terns and piping plovers, so that management effectiveness can be evaluated. Extremely high flows and flooding of the Missouri River in 1997 created and improved vast amounts of nesting habitat for least terns and piping plovers. Since 1998, there has been an apparent loss and/or degradation of habitat throughout the river system. However, during the same timeframe reservoir water levels have declined, exposing extensive piping plover breeding habitat. For example, 64 percent of adult piping plovers using the Missouri River in 2005 were observed on reservoir habitats, and 43 percent were observed on Lake Sakakawea (Threatened and Endangered Species Section, Omaha District, U.S. Army Corps of Engineers, unpub. data, 2006). Given the vast dynamics of this river and reservoir system, systemwide monitoring of habitat is clearly needed for the U.S. Army Corps of Engineers (USACE) to employ adaptive management (with respect to river operations) to provide most optimal conditions for the maintenance of breeding habitat of least terns and piping plovers. As a result of this need, the U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, began work on a habitat monitoring plan in 2005 as a conceptual framework for adaptive management.

  15. Improving Air Force Command and Control Through Enhanced Agile Combat Support Planning, Execution, Monitoring, and Control Processes

    Science.gov (United States)

    2012-01-01

    assess, plan, execute [ MAPE ] model) are an integral part of Air Force enterprise and joint command and control capability. In the revised copy of Air...operations. 2 Similar in construct, the Air Force uses the MAPE model when discussing ACS processes. 3 In the revised copy of AFDD 1, dated November 12, 2010...MAJCOM major command xliv Improving Air Force C2 Through Enhanced Agile Combat Support Processes MAJCOM/CC commander, major command MAPE monitor, assess

  16. Changing pattern of the subcellular distribution of erythroblast macrophage protein (Emp) during macrophage differentiation.

    Science.gov (United States)

    Soni, Shivani; Bala, Shashi; Kumar, Ajay; Hanspal, Manjit

    2007-01-01

    Erythroblast macrophage protein (Emp) mediates the attachment of erythroid cells to macrophages and is required for normal differentiation of both cell lineages. In erythroid cells, Emp is believed to be involved in nuclear extrusion, however, its role in macrophage differentiation is unknown. Information on the changes in the expression level and subcellular distribution of Emp in differentiating macrophages is essential for understanding the function of Emp. Macrophages of varying maturity were examined by immunofluorescence microscopy and biochemical methods. Our data show that Emp is expressed in all stages of maturation, but its localization pattern changes dramatically during maturation: in immature macrophages, a substantial fraction of Emp is associated with the nuclear matrix, whereas in more mature cells, Emp is expressed largely at cell surface. Pulse-chase experiments show that nascent Emp migrates intracellularly from the cytoplasm to the plasma membrane more efficiently in mature macrophages than in immature cells. Incubation of erythroid cells with macrophages in culture shows that erythroid cells attach to mature macrophages but not to immature macrophage precursors. Together, our data show that the temporal and spatial expression of Emp correlates with its role in erythroblastic island formation and suggest that Emp may be involved in multiple cellular functions.

  17. Facebook tells me so: applying the theory of planned behavior to understand partner-monitoring behavior on Facebook.

    Science.gov (United States)

    Darvell, Millie J; Walsh, Shari P; White, Katherine M

    2011-12-01

    The social networking site (SNS) Facebook is becoming increasingly recognized as a medium through which individuals can investigate and monitor others' activities. However, little is known about whether Facebook monitoring behavior occurs within romantic relationships and, accordingly, the psychological predictors of this behavior. The present study employed an extended theory of planned behavior (TPB) framework including self-esteem, partner trust, and demographic characteristics, to predict frequent Facebook partner-monitoring. Facebook users (N=244) in romantic relationships completed measures assessing the standard TPB constructs (attitude, subjective norm, and perceived behavioral control), additional predictor variables (self-esteem and partner trust), and demographic characteristics (age, gender, relationship length, daily Facebook logins, and time spent per login). One week later, participants reported their level of Facebook partner-monitoring during the previous week. Regression analyses supported the standard TPB constructs of attitude and subjective norm in predicting intentions to engage in frequent Facebook partner-monitoring, with intention, in turn, predicting behavior. Partner trust, but not self-esteem, significantly predicted frequent Facebook partner-monitoring intentions. Of the demographic characteristics, daily Facebook logins significantly predicted both intention and behavior and, unexpectedly, relationship length directly affected behavior. Overall, the current study revealed that frequent Facebook partner-monitoring is influenced by attitudinal, normative, and relational factors and, potentially, increased visits to Facebook. These findings provide a new understanding of an individual's use of the world's leading SNS to monitor their partner's activities and provide a foundation for future studies to investigate the potential negative implications this activity may have for those in romantic relationships.

  18. SU-E-T-76: A Software System to Monitor VMAT Plan Complexity in a Large Radiotherapy Centre

    Energy Technology Data Exchange (ETDEWEB)

    Arumugam, S; Xing, A [Liverpool and Macarthur Cancer Therapy Centres, Sydney, NSW (Australia); Ingham Institute, Sydney, NSW (Australia); Vial, P [Liverpool and Macarthur Cancer Therapy Centres, Sydney, NSW (Australia); Ingham Institute, Sydney, NSW (Australia); Institute of Medical Physics, School of Physics, University of Sydney, Sydney, NSW (Australia); Thwaites, D [Institute of Medical Physics, School of Physics, University of Sydney, Sydney, NSW (Australia); Holloway, L [Liverpool and Macarthur Cancer Therapy Centres, Sydney, NSW (Australia); Ingham Institute, Sydney, NSW (Australia); Institute of Medical Physics, School of Physics, University of Sydney, Sydney, NSW (Australia); Centre for Medical Radiation Physics, University of Wollongong, Wollongong, NSW (Australia)

    2015-06-15

    Purpose: To develop a system that analyses and reports the complexity of Volumetric Modulated Arc Therapy (VMAT) plans to aid in the decision making for streamlining patient specific dosimetric quality assurance (QA) tests. Methods: A software system, Delcheck, was developed in-house to calculate VMAT plan and delivery complexity using the treatment delivery file. Delcheck has the functionality to calculate multiple plan complexity metrics including the Li-Xing Modulation Index (LI-MI), multiplicative combination of Leaf Travel and Modulation Complexity Score (LTMCSv), Monitor Units per prescribed dose (MU/D) and the delivery complexity index (MIt) that incorporates the modulation of dose rate, leaf speed and gantry speed. Delcheck includes database functionality to store and compare plan metrics for a specified treatment site. The overall plan and delivery complexity is assessed based on the 95% conformance limit of the complexity metrics as Similar, More or Less complex. The functionality of the software was tested using 42 prostate conventional, 10 prostate SBRT and 15 prostate bed VMAT plans generated for an Elekta linear accelerator. Results: The mean(σ) of LI-MI for conventional, SBRT and prostate bed plans were 1690(486), 3215.4(1294) and 3258(982) respectively. The LTMCSv of the studied categories were 0.334(0.05), 0.325(0.07) and 0.3112(0.09). The MU/D of the studied categories were 2.4(0.4), 2.7(0.7) and 2.5(0.5). The MIt of the studied categories were 21.6(3.4), 18.2(3.0) and 35.9(6.6). The values of the complexity metrics show that LI-MI appeared to resolve the plan complexity better than LTMCSv and MU/D. The MIt value increased as the delivery complexity increased. Conclusion: The developed software was shown to be working as expected. In studied treatment categories Prostate bed plans are more complex in both plan and delivery and SBRT is more complex in plan and less complex in delivery as demonstrated by LI-MI and MIt. This project was funded

  19. Metering Plan: Monitoring Energy and Potable Water Use in PNNL EMS4 Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Pope, Jason E.

    2012-07-25

    This Plan presents progress toward the metering goals shared by all national laboratories and discusses PNNL's contemporary approach to the installation of new meters. In addition, the Plan discusses the data analysis techniques with which PNNL is working to mature using endless data streams made available as a result of increased meter deployment.

  20. Facilitating food-related planning : Applying metacognition, cue-monitoring, and implementation intentions

    NARCIS (Netherlands)

    Verhoeven, A.A.C.

    2015-01-01

    Implementation intentions are specific if-then plans that can successfully change unwanted habits by linking the critical cue triggering the unwanted behavior to a healthier alternative. For example, in order to consume fewer unhealthy snacks while watching television, a plan could be formulated lik

  1. Final work plan : targeted groundwater sampling and monitoring well installation for potential site reclassification at Barnes, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-07-11

    This ''Work Plan'' outlines the scope of work for a targeted groundwater sampling investigation and monitoring well installation at Barnes, Kansas. This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with the intergovernmental agreement between the KDHE and the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA). Data resulting from the proposed work will be used to determine the hydraulic gradient near the former CCC/USDA facility, delineate the downgradient carbon tetrachloride plume, and determine additional monitoring requirements at Barnes. The overall goal is to establish criteria for monitoring leading to potential site reclassification. The proposed work will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The Farm Service Agency of the USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a ''Master Work Plan'' (Argonne 2002) to provide general guidance for all investigations at former CCC/USDA facilities in Kansas. The ''Master Work Plan'', approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Barnes.

  2. Scientific monitoring plan in support of the selected alternative of the Glen Canyon Dam Long-Term Experimental and Management Plan

    Science.gov (United States)

    Vanderkooi, Scott P.; Kennedy, Theodore A.; Topping, David J.; Grams, Paul E.; Ward, David L.; Fairley, Helen C.; Bair, Lucas S.; Yackulic, Charles B.; Schmidt, John C.; Sankey, Joel B.

    2017-01-18

    IntroductionThe purpose of this document is to describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to the U.S. Department of the Interior (DOI), its bureaus, and to the Glen Canyon Dam Adaptive Management Program (GCDAMP) in support of implementation of the Glen Canyon Dam Long-Term Experimental and Management Plan (LTEMP) (U.S. Department of the Interior, 2016a). The selected alternative identified in the LTEMP Record of Decision (ROD) (U.S. Department of the Interior, 2016b) describes various data collection, analysis, modeling, and interpretation efforts to be conducted by the U.S. Geological Survey’s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), partner agencies, and cooperators that will inform decisions about operations of Glen Canyon Dam and management of downstream resources between 2017 and 2037, the performance period of the LTEMP. General data collection, analysis, modeling, and interpretation activities are described in this science plan, whereas specific monitoring and research activities and detailed study plans are to be described in the GCDAMP’s triennial work plans (TWPs) to be developed by the Bureau of Reclamation and GCMRC with input from partner agencies and cooperators during the LTEMP period, which are to be reviewed and recommended by the GCDAMP and approved by the Secretary of the Interior. The GCDAMP consists of several components, the primary committee being the Adaptive Management Work Group (AMWG). This Federal advisory committee is composed of 25 agencies and stakeholder groups and is chaired by the Secretary of the Interior’s designee. The AMWG makes recommendations to the Secretary of the Interior concerning operations of Glen Canyon Dam and other experimental management actions that are intended to fulfill some obligations of the Grand Canyon Protection Act of 1992. The Technical Work Group (TWG) is a subcommittee of the AMWG and

  3. Altered expression of CLC, DSG3, EMP3, S100A2, and SLPI in corneal epithelium from keratoconus patients

    DEFF Research Database (Denmark)

    Nielsen, Kim; Heegaard, Steffen; Vorum, Henrik

    2005-01-01

    PURPOSE: This investigation was designed to determine whether the five genes, CLC, DSG3, EMP3, S100A2 and SLPI, are differentially expressed in keratoconus, as indicated from another study. METHODS: Gene expression was monitored using quantitative real-time PCR on 14 keratoconus samples and 16...... differentially expressed in keratoconus (P ... SNPs (rs374185 and rs384138) were observed in the CLC gene, each with an allele frequency of 68%. No other mutations were detected. CONCLUSIONS: The five genes, and three of the encoded proteins, were shown differentially expressed between a group of keratoconus patients and a reference group using...

  4. Implementation of the monitoring Plan of the State and behavior of the systems in the Central Nuclear Almaraz; Implantacion del Plan de Seguimiento del Estado y Comportamiento de Sistemas en la Central Nuclear Almaraz

    Energy Technology Data Exchange (ETDEWEB)

    Montero Puertas, I.; Gonzalez Redondo, R.; Lopez Pozo, A.

    2013-07-01

    This work aims to present the implementation process of the Monitoring of the State and behavior of the systems in the Nuclear plan Almaraz. Will define the scope, process, frequencies and criteria of evaluation of the State and behavior of the systems included in the Plan of reliability, as well as the documentary requirements of this evaluation. Cases will also be collected practical real phenomena detected during monitoring degradation made and will explain the actions taken prior to the failure.

  5. Long-term Monitoring Plan for the Central Nevada Test Area

    Energy Technology Data Exchange (ETDEWEB)

    Hassan, Ahmed E

    2004-01-01

    This report discusses the long-term monitoring strategy developed for the Central Nevada Test Area (CNTA), where the Faultless underground nuclear test was conducted. It includes a thorough literature review of monitoring well network design. A multi-staged approach for development of the long-term monitoring well network for CNTA is proposed, incorporating a number of issues, including uncertainty of the subsurface environment, cost, selection of well locations, etc. The first stage is to use hydrogeologic expertise combined with model simulations and probability based approaches to select the first set of monitoring wells. The second stage will be based on an optimum design methodology that uses a suitable statistical approach, combined with an optimization approach, to augment the initial set of wells and develop the final long-term monitoring network.

  6. 投影机 爱普生EMP-TW20

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    在爱普生的EMP-TW系列家用投影机中,EMP-TW20是最新的一款低端产品。在外观方面,它仍保持了爱普生EMP-TW投影机简浩高质感的设计风格,而且乳白色的机身可以很容易地与家居环境融合.

  7. Exponential megapriming PCR (EMP) cloning--seamless DNA insertion into any target plasmid without sequence constraints.

    Science.gov (United States)

    Ulrich, Alexander; Andersen, Kasper R; Schwartz, Thomas U

    2012-01-01

    We present a fast, reliable and inexpensive restriction-free cloning method for seamless DNA insertion into any plasmid without sequence limitation. Exponential megapriming PCR (EMP) cloning requires two consecutive PCR steps and can be carried out in one day. We show that EMP cloning has a higher efficiency than restriction-free (RF) cloning, especially for long inserts above 2.5 kb. EMP further enables simultaneous cloning of multiple inserts.

  8. Analysis of electromagnetic pulse (EMP measurements in the National Ignition Facility's target bay and chamber

    Directory of Open Access Journals (Sweden)

    Brown C.G.

    2013-11-01

    Full Text Available From May 2009 to the present we have recorded electromagnetic pulse (EMP strength and spectrum (100 MHz – 5 GHz in the target bay and chamber of the National Ignition Facility (NIF. The dependence of EMP strength and frequency spectrum on target type and laser energy is discussed. The largest EMP measured was for relatively low-energy, short-pulse (100 ps flat targets.

  9. Exponential megapriming PCR (EMP cloning--seamless DNA insertion into any target plasmid without sequence constraints.

    Directory of Open Access Journals (Sweden)

    Alexander Ulrich

    Full Text Available We present a fast, reliable and inexpensive restriction-free cloning method for seamless DNA insertion into any plasmid without sequence limitation. Exponential megapriming PCR (EMP cloning requires two consecutive PCR steps and can be carried out in one day. We show that EMP cloning has a higher efficiency than restriction-free (RF cloning, especially for long inserts above 2.5 kb. EMP further enables simultaneous cloning of multiple inserts.

  10. Identifying the ‘if’ for ‘if-then’ plans: Combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour

    NARCIS (Netherlands)

    Verhoeven, A.A.C.; Adriaanse, M.A.; Vet, de E.; Fennis, B.M.; Ridder, de D.T.D.

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring,

  11. Identifying the ‘if’ for ‘if-then’ plans : Combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour

    NARCIS (Netherlands)

    Verhoeven, Aukje A C; Adriaanse, Marieke A.; de Vet, Emely; Fennis, Bob M.; de Ridder, Denise T D

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring,

  12. Contaminants Monitoring Plan on the Mark Twain National Wildlife Refuge and Adjacent Locations on the Mississippi River with Proposed 1992 Field Activities

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The goal of the monitoring plan is to provide data to determine if fish, colonial birds, waterfowl, endangered species, and their habitats at and adjacent to Mark...

  13. Inventory and Monitoring Plan for Howland Island, Baker Island, Jarvis Island National Wildlife Refuges; Units of the Pacific Remote Islands Marine National Monuments

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan documents and prioritizes inventory and monitoring surveys and research currently conducted, and proposed to be conducted, at the Howland Island, Baker...

  14. STRATEGIC PLANNING AT THE ENTERPRISE: APPLICATION OF A METHOD OF THE ANALYSIS OF HIERARCHIES FOR THE STRATEGIC ACTIVITY MONITORING

    Directory of Open Access Journals (Sweden)

    Ilya V. Samarin

    2014-01-01

    Full Text Available The technique of application of a method of the analysis of hierarchiesfor the solution of problems of monitoring of activity of the enterprise onadvance to a strategic objective in the course of implementation of thecurrent medium-term plan is presented. Problems of an assessment of astate and situation forecasting to the termination of the current planningperiod are considered. The matrix method which is the return method ofthe analysis of hierarchies, allowing to estimate and predict a situationwith implementation of the plan in all structures of the enterprise andrealizing procedure of strategic monitoring at the enterprise is developed. Statistical and analytical methods of the solution of a problemof forecasting are presented. For the solution of a task the statisticalmethod developed algorithm of the numerical solution of a task and itsflowchart is submitted. An algorithm for solving the problem of determination of the integral strategic risk the implementation of the set ofevents. Shows an example of solving the problem of determination ofthe degree of achievement of the intermediate objectives for the knownvalues of the degree of implementation of all stipulated by a plan ofactions (works for the six-level hierarchical scheme.

  15. Influence of irradiation on release of endothelial microparticles (EMP) in vitro.

    Science.gov (United States)

    Neuber, Christin; Pufe, Johanna; Pietzsch, Jens

    2015-01-01

    Survivors of Hodgkin's disease as well as of breast and lung cancer are at risk of radiation-associated cardiovascular disease. Recent studies demonstrated a correlation between cardiovascular risk factors and circulating endothelial microparticles (EMP) and thereby suggest increased EMP levels in circulation to be an early biomarker of endothelial dysfunction and cardiovascular risk. This prompted us to analyze the amount of EMP released by human aortic endothelial cells (HAEC) after exposure to different doses of X-ray (0.4, 2, 4, 6, and 20 Gy) using antibodies against the endothelial cell markers CD31, CD144, and CD146 by flow cytometry. In this pilot experiment only CD146 proved appropriate for quantification of HAEC-derived EMP. Exposure of HAEC to different doses of X-ray did not significantly influence formation of CD146-positive EMP. However, low doses (0.4 Gy) tended to decrease EMP formation, whereas higher doses (2 or 4 Gy) slightly increased release of CD146-positive EMP. By contrast, inflammatory activation of HAEC by TPA significantly increased EMP release about 15-fold (P EMP did not prove a suitable biomarker for radiation-induced endothelial dysfunction in vitro.

  16. Epson新品投影机EMP-81/61

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    Epson EMP-81和EMP-61设计上注重为用户提供实用的功能和简便自如的操作,提供了新型遥控器、安全保护功能、短距离投影、EMP监控、直接投影、自动梯形校正和快速开机、关机功能,EMP-81和EMP-61还提供了适合不同投影环境的多种投影模式供选择。

  17. Strategic Plan for inventories and monitoring on National Wildlife Refuges : Adapting to environmental change

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Strategic Plan summarizes and provides a long-term perspective for how the National Wildlife Refuge System will implement a nationally coordinated effort to...

  18. Evaluation of black-billed magpies as monitors of environmental contamination : Work plan 1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Preliminary proposal and work plan for the project "Evaluation of Black-billed Magpies as Indicators of Environmental Contamination at the Rocky Mountain Arsenal"....

  19. The Error Monitoring and Processing System in Alcohol Use

    Directory of Open Access Journals (Sweden)

    Menizibeya O. Welcome

    2010-10-01

    Full Text Available Background: Current data suggest that alcohol might play significant role in error commission. Error commission is related to the functions of the Error Monitoring and Processing System (EMPS located in the substantia nigra of the midbrain, basal ganglia and cortex of the forebrain. The main components of the EMPS are the dopaminergic system and anterior cingulate cortex. Although, recent data show that alcohol disrupts the EMPS, the ways in which alcohol affects this system are poorly understood.Aims & Objectives: We reviewed recent data that suggest the indirect effect of alcohol use on error commission.Methods / Study Design: Databases were searched for relevant literatures using the following keywords combination – Alcohol AND Error Commission (OR Processing, Monitoring, Correction, Detection. Literatures were searched in scientific databases (Medline, DOAJ, Embase from 1940 to August 2010, journal website (Psychophysiology, Neuroscience and Trends in Neuroscience. Manual book search, including library information were included in the data collection process. Other additional information was searched through Google.Results / Findings: Blood and brain glucose levels play a vital role in error commission, and are related to error commission, monitoring and processing through the modulation of the activity of the dopaminergic system. To summarize the results of our findings, here we suggest a hypothesis of Alcohol-Related Glucose-Dependent System of Error Monitoring and Processing (ARGD-EMPS hypothesis, which holds that the disruption of the EMPS is related to the competency of glucose homeostasis regulation, which in turn may determine the dopamine level as a major component of the EMPS. The ARGD-EMPS hypothesis explains the general processes and mechanism of alcohol related disruption of the EMPS.Conclusion: Alcohol may indirectly disrupt the EMPS by affecting dopamine level through disorders in blood glucose homeostasis regulation. The

  20. DEVELOPING LINGUISTIC SKILLS AND ABILITIES IN EMP STUDENTS

    Directory of Open Access Journals (Sweden)

    Nataša Milosavljević

    2012-03-01

    Full Text Available English for medical purposes falls within the category of discipline-specific language learning. It is characterized by specific linguistic features and requires specific study that is possible to carry out using specially designed programmes. Reading skill is one way of learning strategy of English for medical purposes. Most often, students use this skill in order to obtain information for some particular topic from the area of medical science, or because they need some sort of instruction in order to carry out certain task. Vocabulary acquisition plays a very important role in EMP teaching. It is achieved best through learning vocabulary in context, rather than in isolation. One of the most important questions in EMP teaching is related to what grammatical constructions should be analysed and emphasised. Some types of these activities would include, for example, asking students to find examples of one particular structure in the text or fill in the blanks with the missing forms such as tenses, passive forms, prepositions, etc. Speaking skill represents productive skill the aim of which is communication. In order for foreign language communication to be suucessful, a student should know linguistic and cultural features of native speakers and follow certain rules and conventions that are not easy to define. It is of crucial importance that during teaching process students develop strategies and techniques that will help them use linguistic structures fluently, apply language in different situations, take part in discussions, and use acquired vocabulary in accurate and precise way.

  1. Inventory and Monitoring (I&M) Initiative FY 2012 Annual Report and FY 2013 Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual report describes implementation of the National Wildlife Refuge System's Inventory and Monitoring (I results from all eight regions and the I&M...

  2. Development of a stormwater monitoring plan and geographic information system at Back Bay, Virginia

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The initial objective of the Service's Back Bay Initiative will be to implement the first phase of a multi-year stormwater monitoring study to identify the main...

  3. Inventory and Monitoring Plan for the Alaska Maritime National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This IMP documents the priority inventory, monitoring, and research surveys for the Alaska Maritime NWR. Refuge management prioritizes survey and research efforts in...

  4. Eleventh annual Department of Energy low-level waste management conference. Volume 2: Low-level waste strategy and planning, decontamination and decommissioning, compliance monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-11-01

    Nineteen papers are presented in volume 2. The 11 papers in the LLW Strategy and Planning section discuss plans for disposal facilities in Texas, Pennsylvania, Hanford, the Southwest and Southeast Compacts, and others. Three papers discuss decontamination technology and activities. Environmental monitoring requirements and recommendations at LLW facilities are discussed in 5 papers. Papers have been processed separately for inclusion on the data base.

  5. Long-term Monitoring Plan for the Shoal Underground Nuclear Test

    Energy Technology Data Exchange (ETDEWEB)

    Ahmed Hassan

    2005-02-01

    The flow and transport model of Shoal is used to design a three-well monitoring network to be part of the long-term monitoring network for the site and achieve two objectives: (1) detect the presence of radionuclides in case they migrate to the monitoring well locations, and (2) provide field data to compare with model predictions as part of the model validation process. Using three different quantitative approaches and the numerical groundwater flow and transport model developed for Shoal, three new monitoring well locations were identified from 176 different networks. In addition to the quantitative analyses using the numerical model, the development of the monitoring network for Shoal will also be subject to qualitative hydrogeologic interpretation during implementation. information will only be available during the fieldwork, it will be incorporated in the monitoring well design at the time of well installation. Finally, it should be noted that the CADD-CAP for Shoal, including the compliance boundary, is not yet approved. Should the compliance boundary change from the 1,000-year MCL contaminant boundary, well locations may also need to change. However, the analysis reported here provides a number of alternatives with reasonable detection efficiency.

  6. A detection-level hazardous waste ground-water monitoring compliance plan for the 200 areas low-level burial grounds and retrievable storage units

    Energy Technology Data Exchange (ETDEWEB)

    1987-02-01

    This plan defines the actions needed to achieve detection-level monitoring compliance at the Hanford Site 200 Areas Low-Level Burial Grounds (LLBG) in accordance with the Resource Conservation and Recovery Act (RCRA). Compliance will be achieved through characterization of the hydrogeology and monitoring of the ground water beneath the LLBG located in the Hanford Site 200 Areas. 13 refs., 20 figs.

  7. Groundwater monitoring program plan and conceptual site model for the Al-Tuwaitha Nuclear Research Center in Iraq.

    Energy Technology Data Exchange (ETDEWEB)

    Copland, John Robin; Cochran, John Russell

    2013-07-01

    The Radiation Protection Center of the Iraqi Ministry of Environment is developing a groundwater monitoring program (GMP) for the Al-Tuwaitha Nuclear Research Center located near Baghdad, Iraq. The Al-Tuwaitha Nuclear Research Center was established in about 1960 and is currently being cleaned-up and decommissioned by Iraqs Ministry of Science and Technology. This Groundwater Monitoring Program Plan (GMPP) and Conceptual Site Model (CSM) support the Radiation Protection Center by providing: A CSM describing the hydrogeologic regime and contaminant issues, recommendations for future groundwater characterization activities, and descriptions of the organizational elements of a groundwater monitoring program. The Conceptual Site Model identifies a number of potential sources of groundwater contamination at Al-Tuwaitha. The model also identifies two water-bearing zones (a shallow groundwater zone and a regional aquifer). The depth to the shallow groundwater zone varies from approximately 7 to 10 meters (m) across the facility. The shallow groundwater zone is composed of a layer of silty sand and fine sand that does not extend laterally across the entire facility. An approximately 4-m thick layer of clay underlies the shallow groundwater zone. The depth to the regional aquifer varies from approximately 14 to 17 m across the facility. The regional aquifer is composed of interfingering layers of silty sand, fine-grained sand, and medium-grained sand. Based on the limited analyses described in this report, there is no severe contamination of the groundwater at Al-Tuwaitha with radioactive constituents. However, significant data gaps exist and this plan recommends the installation of additional groundwater monitoring wells and conducting additional types of radiological and chemical analyses.

  8. Long Term Resource Monitoring Program procedures: fish monitoring

    Science.gov (United States)

    Ratcliff, Eric N.; Glittinger, Eric J.; O'Hara, T. Matt; Ickes, Brian S.

    2014-01-01

    This manual constitutes the second revision of the U.S. Army Corps of Engineers’ Upper Mississippi River Restoration-Environmental Management Program (UMRR-EMP) Long Term Resource Monitoring Program (LTRMP) element Fish Procedures Manual. The original (1988) manual merged and expanded on ideas and recommendations related to Upper Mississippi River fish sampling presented in several early documents. The first revision to the manual was made in 1995 reflecting important protocol changes, such as the adoption of a stratified random sampling design. The 1995 procedures manual has been an important document through the years and has been cited in many reports and scientific manuscripts. The resulting data collected by the LTRMP fish component represent the largest dataset on fish within the Upper Mississippi River System (UMRS) with more than 44,000 collections of approximately 5.7 million fish. The goal of this revision of the procedures manual is to document changes in LTRMP fish sampling procedures since 1995. Refinements to sampling methods become necessary as monitoring programs mature. Possible refinements are identified through field experiences (e.g., sampling techniques and safety protocols), data analysis (e.g., planned and studied gear efficiencies and reallocations of effort), and technological advances (e.g., electronic data entry). Other changes may be required because of financial necessity (i.e., unplanned effort reductions). This version of the LTRMP fish monitoring manual describes the most current (2014) procedures of the LTRMP fish component.

  9. Groundwater monitoring plan for the Hanford Site 216-B-3 pond RCRA facility

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D.B.; Chou, C.J.

    1998-06-01

    The 216-B-3 pond system was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In operation since 1945, the B Pond system has been a RCRA facility since 1986, with Resource Conservation and Recovery Act (RCRA) interim-status groundwater monitoring in place since 1988. In 1994, discharges were diverted from the main pond, where the greatest potential for contamination was thought to reside, to the 3C expansion pond. In 1997, all discharges to the pond system were discontinued. In 1990, the B Pond system was elevated from detection groundwater monitoring to an assessment-level status because total organic halogens and total organic carbon were found to exceed critical means in two wells. Subsequent groundwater quality assessment failed to find any specific hazardous waste contaminant that could have accounted for the exceedances, which were largely isolated in occurrence. Thus, it was recommended that the facility be returned to detection-level monitoring.

  10. Addendum to the 1996 Gunnison Monitoring Report for the Gunnison, Colorado Wetlands Mitigation Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is an addendum to the 1996 Gunnison Monitoring Report for the Gunnison, Colorado, Wetlands Mitigation Report, dated July 1997. The purpose of this addendum is to: (1) modify how information on plant height and plant species criteria are presented; and (2) provide more detailed information regarding the evaluation of the bare ground criteria at the Camp Ketle site. The information in this addendum is provided at the request of the Bureau of Land Management to aid in future monitoring and evaluation of the wetland mitigation sites.

  11. 78 FR 35073 - Compass Efficient Model Portfolios, LLC and Compass EMP Funds Trust; Notice of Application

    Science.gov (United States)

    2013-06-11

    ... COMMISSION Compass Efficient Model Portfolios, LLC and Compass EMP Funds Trust; Notice of Application June 4.... Applicants: Compass Efficient Model Portfolios, LLC (the ``Adviser'') and Compass EMP Funds Trust (``the... perspective of the investor, the role of the Subadvisers is comparable to that of the individual...

  12. Promoter Hypermethylation of the EMP3 Gene in a Series of 229 Human Gliomas

    Directory of Open Access Journals (Sweden)

    Marta Mellai

    2013-01-01

    Full Text Available The epithelial membrane protein 3 (EMP3 is a candidate tumor suppressor gene in the critical region 19q13.3 for several solid tumors, including tumors of the nervous systems. The aim of this study was to investigate the EMP3 promoter hypermethylation status in a series of 229 astrocytic and oligodendroglial tumors and in 16 GBM cell lines. The analysis was performed by methylation-specific PCR and capillary electrophoresis. Furthermore, the EMP3 expression at protein level was evaluated by immunohistochemistry and Western blotting analysis. Associations of EMP3 hypermethylation with total 1p/19q codeletion, MGMT promoter hypermethylation, IDH1/IDH2 and TP53 mutations, and EGFR amplification were studied, as well as its prognostic significance. The EMP3 promoter hypermethylation has been found in 39.5% of gliomas. It prevailed in low-grade tumors, especially in gliomas with an oligodendroglial component, and in sGBMs upon pGBMs. In oligodendroglial tumors, it was strongly associated with both IDH1/IDH2 mutations and total 1p/19q codeletion and inversely with EGFR gene amplification. No association was found with MGMT hypermethylation and TP53 mutations. In the whole series, the EMP3 hypermethylation status correlated with 19q13.3 loss and lack of EMP3 expression at protein level. A favorable prognostic significance on overall survival of the EMP3 promoter hypermethylation was found in patients with oligodendroglial tumors.

  13. EMP-1 promotes tumorigenesis of NSCLC through PI3K/AKT pathway.

    Science.gov (United States)

    Lai, Senyan; Wang, Guihua; Cao, Xiaonian; Li, Zhaoming; Hu, Junbo; Wang, Jing

    2012-12-01

    This study examined the role of EMP-1 in tumorigenesis of non-small cell lung carcinoma (NSCLC) and the possible mechanism. Specimens were collected from 28 patients with benign lung diseases and 28 with NSCLC, and immunohistochemically detected to evaluate the correlation of EMP-1 expression to the clinical features of NSCLC. Recombinant adenovirus was constructed to over-express EMP-1 and then infect PC9 cells. Cell proliferation was measured by Ki67 staining. Western blotting was performed to examine the effect of EMP-1 on the PI3K/AKT signaling. Moreover, tumor xenografts were established by subcutaneous injection of PC9 cell suspension (about 5×10(7)/mL in 100 μL of PBS) into the right hind limbs of athymic nude mice. The results showed EMP-1 was significantly up-regulated in NSCLC patients as compared with those with benign lung diseases. Over-expression of EMP-1 promoted proliferation of PC9 cells, which coincided with the activation of the PI3K/AKT pathway. EMP-1 promoted the growth of xenografts of PC9 cells in athymic nude mice. It was concluded that EMP-1 expression may contribute to the development and progress of NSCLC by activating PI3K/AKT pathway.

  14. EMP INDUCES APOPTOSIS IN HUMAN LUNG CARCINOMA CELL LINE GLC-82

    Institute of Scientific and Technical Information of China (English)

    曹晓哲; 赵梅兰; 王德文; 董波

    2002-01-01

    Objective: To study the effect of electromagnetic pulse (EMP) on apoptosis of human lung carcinoma cell line GLC-82. Methods: The injury changes in GLC-82 cells after irradiated by EMP (electric field intensity was 60 kV/m with 5 pulses/2 min) were analyzed by cytometry, MTT chronometry and flow cytometry. The immuno- histochemical SP staining was used to determine the expressions of bcl-2 protein and p53 protein. The stained positive cells were analyzed by CMIAS-II image analysis system at a magnification 400. All data were analyzed by SPSS8.0 software. Results: EMP could obviously inhibited lung carcinoma cell line GLC-82 proliferation and increased the number of non-adherent cells. The absorbance value (A570) of MTT decreased immediately, at 0 h, 1 h and 6 h after the GLC-82 cells irradiated by EMP as compared with control group. The highest apoptosis rate was found to reach 13.38% by flow cytometry at 6 h after EMP irradiation. Down-regulation of bcl-2 expression and up-regulation of bax expression were induced by EMP. Conclusion: EMP promoted apoptosis of GLC-82 cells. At same time, EMP can down-regulate bcl-2 expression and up-regulate p53 expression in GLC-82 cells. The bcl-2 and the p53 protein may involve the apoptotic process.

  15. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    S. E. Rawlinson

    2001-09-01

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

  16. Chapter 10. Developing a habitat monitoring program: three examples from national forest planning

    Science.gov (United States)

    Michael I. Goldstein; Lowell H. Suring; Christina D. Vojta; Mary M. Rowland; Clinton. McCarthy

    2013-01-01

    This chapter reviews the process steps of wildlife habitat monitoring described in chapters 2 through 9 and provides three case examples that illustrate how the process steps apply to specific situations. It provides the reader an opportunity to synthesize the material while also revealing the potential knowledge gaps and pitfalls that may complicate completion of a...

  17. Ambient air monitoring plan for Ciudad Acuna and Piedra Negras, Coahuila, Mexico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Winberry, J.; Henning, L.; Crume, R.

    1998-01-01

    The Cities of Ciudad Acuna and Piedras Negras and the State of Coahuila in Mexico are interested in improving ambient air quality monitoring capabilities in the two cities through the establishment of a network of ambient air monitors. The purpose of the network is to characterize population exposure to potentially harmful air contaminants, possibly including sulfur dioxide (SO{sub 2}), nitrogen oxides (NO{sub x}), ozone (O{sub 3}), carbon monoxide (CO), total suspended particulate matter (TSP), particulate matter with aerodynamic diameter less than 100 micrometers PM-10, and lead. This report presents the results of an evaluation of existing air quality monitoring equipment and facilities in Ciudad Acuna and Piedras Negras. Additionally, the report presents recommendations for developing an air quality monitoring network for PM-10, SO{sub 2}, lead, and ozone in these cities, using a combination of both new and existing equipment. The human resources currently available and ultimately needed to operate and maintain the network are also discussed.

  18. "Work in progress" : the hidden dimensions of monitoring and planning in Pakistan

    NARCIS (Netherlands)

    Kolkma, W.A.M.

    1998-01-01

    The study argues that monitoring systems for large numbers of projects constituting public sector development programmes such as found in Pakistan, are built on the positivist premise that progress can be summarised objectively and in a few concise statements or indicators. Theory and

  19. "Work in progress" : the hidden dimensions of monitoring and planning in Pakistan

    NARCIS (Netherlands)

    Kolkma, W.A.M.

    1998-01-01

    The study argues that monitoring systems for large numbers of projects constituting public sector development programmes such as found in Pakistan, are built on the positivist premise that progress can be summarised objectively and in a few concise statements or indicators. Theory and handb

  20. Monitoring Staff Performance: A Plan for Quality Control in Project Follow Through.

    Science.gov (United States)

    Jackson, Donald A.; Bushell, Don, Jr.

    This report describes a staff training and performance monitoring system for elementary school teachers, teacher aides, and parent aides participating in the Behavior Analysis Follow Through (B.A.) compensatory education program. The B.A. model involves the use of additional staff, individualized instruction, programmed curriculum materials, and a…

  1. Wordt het veiliger in de dode hoek? : een plan voor monitoring van de dodehoekproblematiek.

    NARCIS (Netherlands)

    Schoon, C.C.

    2012-01-01

    Is the blind spot getting safer? : a proposal for monitoring the blind spot issue. Blind spot crashes are crashes in which a truck that turns off to the right crashes into a vulnerable road user who goes straight on. The casualties are often cyclists. In the period 2007-2010, blind spot crashes invo

  2. Wordt het veiliger in de dode hoek? : een plan voor monitoring van de dodehoekproblematiek.

    NARCIS (Netherlands)

    Schoon, C.C.

    2012-01-01

    Is the blind spot getting safer? : a proposal for monitoring the blind spot issue. Blind spot crashes are crashes in which a truck that turns off to the right crashes into a vulnerable road user who goes straight on. The casualties are often cyclists. In the period 2007-2010, blind spot crashes invo

  3. Work in progress: the hidden dimensions of monitoring and planning in Pakistan.

    NARCIS (Netherlands)

    Kolkma, W.A.M.

    1998-01-01

    The study argues that monitoring systems for large numbers of projects constituting public sector development programmes such as found in Pakistan, are built on the positivist premise that progress can be summarised objectively and in a few concise statements or indicators. Theory and handbooks on t

  4. Improving health aid for a better planet: The planning, monitoring and evaluation tool (PLANET

    Directory of Open Access Journals (Sweden)

    Devi Sridhar

    2015-12-01

    Full Text Available Background International development assistance for health (DAH quadrupled between 1990 and 2012, from US$ 5.6 billion to US$ 28.1 billion. This generates an increasing need for transparent and replicable tools that could be used to set investment priorities, monitor the distribution of funding in real time, and evaluate the impact of those investments.

  5. Methods for Free-Space Ultra-Short Solitary EMP Measurement

    Directory of Open Access Journals (Sweden)

    Eva Kadlecova

    2006-01-01

    Full Text Available There are some suitable methods for ultra-short solitary electromagnetic pulses (EMP measurement. The EMPs are generated by high power microwave generators. The characteristic of EMPs is high power level (Pmax = 250 MW and very short time duration (tp Î ns. Special requirements for measurement methods are placed because of the specific EMPs properties.Two suitable methods for this application are presented in the paper. The first – calorimetric method, utilizes the thermal impacts of microwave absorption. The second method presented – magneto-optic method, use the Faraday’s magneto-optic effect as a sensor principle. It was realized combined calorimetric sensor and there were made some experimental EMP measurements with good results. The sensor utilizing magneto-optic method is in development.

  6. EMP response modeling of TVS based on the recurrent neural network

    Directory of Open Access Journals (Sweden)

    Zhiqiang JI

    2015-04-01

    Full Text Available Due to the larger workload in the implementation process and the poor consistence between the test results and actual situation problems when using the transmission line pulse (TLP testing methods, a modeling method based on the recurrent neural network is proposed for EMP response forecast. Based on the TLP testing system, two categories of EMP are increased, which are the machine model ESD EMP and human metal model ESD EMP. Elman neural network, Jordan neural network and their combination namely Elman-Jordan neural network are established for response modeling of NUP2105L transient voltage suppressor (TVS forecasting the response under different EMP. The simulation results show that the recurrent neural network has satisfying modeling effects and high computation efficiency.

  7. The cause of outliers in electromagnetic pulse (EMP) locations

    Energy Technology Data Exchange (ETDEWEB)

    Fenimore, Edward E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-10-02

    We present methods to calculate the location of EMP pulses when observed by 5 or more satellites. Simulations show that, even with a good initial guess and fitting a location to all of the data, there are sometime outlier results whose locations are much worse than most cases. By comparing simulations using different ionospheric transfer functions (ITFs), it appears that the outliers are caused by not including the additional path length due to refraction rather than being caused by not including higher order terms in the Appleton-Hartree equation. We suggest ways that the outliers can be corrected. These correction methods require one to use an electron density profile along the line of sight from the event to the satellite rather than using the total electron content (TEC) to characterize the ionosphere.

  8. EMP Needs of Medical Undergraduates in a Saudi Context

    CERN Document Server

    Javid, Choudhary Zahid

    2014-01-01

    Needs analysis (NA) is an information gathering process (Nunan 1988) that is executed to identify the learners reasons for learning a language so that they might be taught the relevant teaching materials. This study was undertaken at College of Medicine and Medical Sciences (CMMS), Taif University during the academic year 2008 to identify English for Medical Purposes (EMP) needs of the medical undergraduates. Multiple methods of data collection such as exploratory interviews, observations and a questionnaire were used to find out their linguistic needs and the data were triangulated to validate the findings. The findings offered significant insights in selecting suitable course contents to teach English to freshmen medical undergraduates of CMMS. It has been reported that 1) the students lacked the required level of English language proficiency, 2) they needed reading and speaking skills more than others and 3) the data analysis also helped identify the most important language tasks in the context of CMMS. Bo...

  9. EPSON(爱普生)EMP-TW2000

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    EPSON不久前推出的EMP—TW10003 LCD 1080p高清投影机自问世以来一直是人们关注的焦点之一,当热潮还未降温,EPSON紧接着又发布了最新的旗舰机种EMP-TW2000。EMP—TW2000同样是一款3LCD的1080P高清投影机,但采用了新开发的Crystal C1ear Fine(C2Fine)D7投影芯片,并且提供了对HDMI1.3a连接的支持,此外还运用了提高画面黑色表现的DEEPBLACK技术和大大扩展色域表现的x.v.Color技术,

  10. Electromagnetic Pulse Sensor and Simulation Notes - EMP 1-27

    Science.gov (United States)

    1980-05-01

    22zo 0 v a (5) Y r. where. r 2 x + z2 The constant V is defined by normalizing the o 0 0 voltage between the plates to unity: i.e. V rA E(x,z...cones. Again, normalizing each 3ource to 1 volt, one obtains a magnetic aource for the upper cone as Jk -(r(x a/4)2 + Z2 ) M e [(X - a/4) 2 + z2 ( 0 0...2 dx’ (50) 48 V EMP 1-27 245-45 The comments regarding the solution of (36) in section 2 are also applicable to the solucion of (50). d. Time

  11. Monitoring implementation of desertification combating plan using geomatics – A case study, districts Dhar and Jhabua, Madhya Pradesh

    Indian Academy of Sciences (India)

    Dasgupta Arunima; P S Dhinwa; A S Rajawat

    2015-02-01

    The world’s drylands are subject to desertification as a result of extended droughts, climate change, and human activities. Development in drylands depends on addressing degradation of the ecosystem, main-streaming sustainable natural resources management, and building upon the existing adaptive capacities of communities and institutions. In this regard, recent scientific results aimed to promote sustainable development through action plans for combating desertification. In India, under the Integrated Mission for Sustainable Development (IMSD) programme, remote sensing based integrated land and water resource studies were carried out with an objective to generate locale specific action plans for sustainable development of a region. A specific study was carried out, in districts of Jhabua and Dhar, in Madhya Pradesh using Composite Land Development Sites (CLDS) approach for forest and wasteland development and soil and water conservation. Various treatments were suggested and implemented in 1995. The present study was carried out with an objective to monitor the positive impacts of combating plan implementation through visual interpretation and NDVI analysis of temporal images of LISS III data, since 1991 to 2013. The study reveals that there is substantial increase in the area of irrigated agricultural land with increase in number of check dams along with the stream channels.

  12. Determination of monitor unit check tolerances based on a comparison with measurement and treatment planning system data

    Energy Technology Data Exchange (ETDEWEB)

    Curtis, Helen [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom); Richmond, Neil, E-mail: neil.richmond@stees.nhs.uk [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom); Burke, Kevin; Walker, Chris [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom)

    2013-04-01

    ABSTRACT: This work describes the experimental validation of treatment planning system monitor unit (MU) calculations against measurement for a range of scenarios. This, together with a comparison of treatment planning system MUs and an independent MU check method, allows the derivation of confidence intervals for the check process. Data were collected for open and 60° motorized wedge fields using an Elekta Synergy linac at 6 and 8 MV using homogeneous and heterogeneous phantoms. Masterplan (Version 4.0) pencil-beam and collapsed cone algorithms were used for the primary MU calculations with full inhomogeneity correction. Results show that both algorithms agree with measurement to acceptable tolerance levels in the majority of the cases studied. The confidence interval for the pencil-beam algorithm MU against an independent check was determined as + 1.6% to −3.4%. This is modified to + 2.3% to −2.5% when data collected with low-density heterogeneities are removed as this algorithm is not used clinically for these cases. The corresponding interval for the collapsed cone algorithm was + 1.2% to −4.3%, indicating that an offset tolerance for the independent check is appropriate. Analysis of clinical conformal treatment plan data generated using the pencil-beam algorithm (1393 beams) returned 93% of beams within the independent check tolerance. Similarly, using the collapsed cone algorithm as the primary MU calculation, 77% (of 1434 beams) were within the confidence interval.

  13. Determination of monitor unit check tolerances based on a comparison with measurement and treatment planning system data.

    Science.gov (United States)

    Curtis, Helen; Richmond, Neil; Burke, Kevin; Walker, Chris

    2013-01-01

    This work describes the experimental validation of treatment planning system monitor unit (MU) calculations against measurement for a range of scenarios. This, together with a comparison of treatment planning system MUs and an independent MU check method, allows the derivation of confidence intervals for the check process. Data were collected for open and 60° motorized wedge fields using an Elekta Synergy linac at 6 and 8MV using homogeneous and heterogeneous phantoms. Masterplan (Version 4.0) pencil-beam and collapsed cone algorithms were used for the primary MU calculations with full inhomogeneity correction. Results show that both algorithms agree with measurement to acceptable tolerance levels in the majority of the cases studied. The confidence interval for the pencil-beam algorithm MU against an independent check was determined as + 1.6% to -3.4%. This is modified to + 2.3% to -2.5% when data collected with low-density heterogeneities are removed as this algorithm is not used clinically for these cases. The corresponding interval for the collapsed cone algorithm was + 1.2% to -4.3%, indicating that an offset tolerance for the independent check is appropriate. Analysis of clinical conformal treatment plan data generated using the pencil-beam algorithm (1393 beams) returned 93% of beams within the independent check tolerance. Similarly, using the collapsed cone algorithm as the primary MU calculation, 77% (of 1434 beams) were within the confidence interval.

  14. Woking Park PAFC CHP monitoring. Phase 1: Planning, installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Goulding, P.S.; Fry, M.R.

    2003-07-01

    This report covers the planning, installation and commissioning of the first commercially operated fuel cell cogeneration system in the UK. The involvement of Woking Borough Council, its approach to energy efficiency, and the Woking Park site are discussed, and details are given of the PC25/C 200kW fuel cell which is manufactured in the US by UTC Fuel Cells. A description of the Woking Park fuel cell combined heat and power application is presented, and the project economics, specification and tendering are examined. The route taken to planning approval is traced, and installation procedures are outlined. The testing of the phosphoric type PC25 fuel cell cogeneration unit is described, and expected cost and project timescales are noted.

  15. Maintaining professional confidence--monitoring work with obese schoolchildren with support of an action plan.

    Science.gov (United States)

    Müllersdorf, Maria; Zuccato, Linda Martinson; Nimborg, Jennie; Eriksson, Henrik

    2010-03-01

    School nurses meet obese children in their everyday work. Although school nurses acknowledge the importance of getting hold of school children's obesity, they seem to lack strategies enabling them to handle the delicacy of the problem. The aim of this study was to describe how school nurses perceive their work with obese children with support of an action plan. Qualitative in-depth interviews were performed with six school nurses working in a municipality, where an action plan for the work with obese school-age children had been implemented. The transcribed data was analysed by a manifest content analysis. The results showed that the informants perceived having a key role in the obesity work, which they experienced as meaningful, but full of pitfalls. They found themselves suitable for the task, but perceived lacking deeper knowledge about specific modes of work such as motivational conversation. As the task was considered delicate, there were great demands for guidelines, education and cooperation. The action plan served as support for maintaining professional confidence throughout the process, but there was room for improvements.

  16. Automatic data processing and analysis system for monitoring region around a planned nuclear power plant

    Science.gov (United States)

    Kortström, Jari; Tiira, Timo; Kaisko, Outi

    2016-03-01

    The Institute of Seismology of University of Helsinki is building a new local seismic network, called OBF network, around planned nuclear power plant in Northern Ostrobothnia, Finland. The network will consist of nine new stations and one existing station. The network should be dense enough to provide azimuthal coverage better than 180° and automatic detection capability down to ML -0.1 within a radius of 25 km from the site.The network construction work began in 2012 and the first four stations started operation at the end of May 2013. We applied an automatic seismic signal detection and event location system to a network of 13 stations consisting of the four new stations and the nearest stations of Finnish and Swedish national seismic networks. Between the end of May and December 2013 the network detected 214 events inside the predefined area of 50 km radius surrounding the planned nuclear power plant site. Of those detections, 120 were identified as spurious events. A total of 74 events were associated with known quarries and mining areas. The average location error, calculated as a difference between the announced location from environment authorities and companies and the automatic location, was 2.9 km. During the same time period eight earthquakes between magnitude range 0.1-1.0 occurred within the area. Of these seven could be automatically detected. The results from the phase 1 stations of the OBF network indicates that the planned network can achieve its goals.

  17. Groundwater Monitoring and Tritium-Tracking Plan for the 200 Area State-Approved Land Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. Brent

    2000-08-31

    The 200 Area State-Approved Land Disposal Site (SALDS) is a drainfield which receives treated wastewater, occasionally containing high levels of tritium from treatment of Hanford Site liquid wastes. Only the SALDS proximal wells (699-48-77A, 699-48-77C, and 699-48-77D) have been affected by tritium from the facility thus far; the highest activity observed (2.1E+6 pCi/L) occurred in well 699-48-77D in February 1998. Analytical results of groundwater geochemistry since groundwater monitoring began at the SALDS indicate that all constituents with permit enforcement limits have been below those limits with the exception of one measurement of total dissolved solids (TDS) in 1996. The revised groundwater monitoring sampling and analysis plan eliminates chloroform, acetone, tetrahydrofuran, benzene, and ammonia as constituents. Replicate field measurements will replace laboratory measurements of pH for compliance purposes. A deep companion well to well 699-51-75 will be monitored for tritium deeper in the uppermost aquifer.

  18. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    BUSSELL, J.H.

    1999-08-25

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.

  19. Groundwater monitoring plan for the Hanford Site 200 Area Treated Effluent Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    DB Barnett

    2000-05-17

    Seven years of groundwater monitoring at the 200 Area Treated Effluent Disposal Facility (TEDF) have shown that the uppermost aquifer beneath the facility is unaffected by TEDF effluent. Effluent discharges have been well below permitted and expected volumes. Groundwater mounding from TEDF operations predicted by various models has not been observed, and waterlevels in TEDF wells have continued declining with the dissipation of the nearby B Pond System groundwater mound. Analytical results for constituents with enforcement limits indicate that concentrations of all these are below Practical Quantitation Limits, and some have produced no detections. Likewise, other constituents on the permit-required list have produced results that are mostly below sitewide background. Comprehensive geochemical analyses of groundwater from TEDF wells has shown that most constituents are below background levels as calculated by two Hanford Site-wide studies. Additionally, major ion proportions and anomalously low tritium activities suggest that groundwater in the aquifer beneath the TEDF has been sequestered from influences of adjoining portions of the aquifer and any discharge activities. This inference is supported by recent hydrogeologic investigations which indicate an extremely slow rate of groundwater movement beneath the TEDF. Detailed evaluation of TEDF-area hydrogeology and groundwater geochemistry indicate that additional points of compliance for groundwater monitoring would be ineffective for this facility, and would produce ambiguous results. Therefore, the current groundwater monitoring well network is retained for continued monitoring. A quarterly frequency of sampling and analysis is continued for all three TEDF wells. The constituents list is refined to include only those parameters key to discerning subtle changes in groundwater chemistry, those useful in detecting general groundwater quality changes from upgradient sources, or those retained for comparison with end

  20. Implementation of PLUTO Buoy for Monitoring Water Quality in Indonesia, Reflection and Future Plans

    Science.gov (United States)

    Chandra, H.; Krismono, K.; Kusumaningrum, P. D.; Sianturi, D.; Firdaus, Y.; Taukhid, I.; Borneo, B. B.

    2016-02-01

    Research and development of PLUTO (Perairan Selalu Termonitor/Waters Always Monitored) buoy has reached its fourth year in 2015. Try out has been done in coastal waters, fishponds, fishing port ponds, and reservoirs. In the first year (2010) try out has been performed on coastal waters with off line measurement system. The buoy used temperature, salinity, DO and pH sensors. In the second year (2013) try out was carried out on fishponds and fishing port ponds using telemetry measurement system. In the third year (2014) try out was carried out on water reservoir with telemetry measurement system. In the fourth year (2015) android application is developed to monitor 4 water reservoirs and 1 lake. Beside that, observation point is added to 3 point depth for one buoy. Parameters used are temperature, DO, and turbidity. Three PLUTO buoys are placed in each reservoir, at inlet, outlet, and at center of fish cultivation. Through Ocean Science Meeting in New Orleans it is hoped that there will be input and suggestion from the experts for future development of the monitoring system for public inland waters (especially reservoir and lake) in Indonesia. Keywords: buoy PLUTO, salinity, temperature, Dissolved Oxygen (DO), pH, turbidity, telemetry

  1. Developing monitoring plans to detect spills related to natural gas production.

    Science.gov (United States)

    Harris, Aubrey E; Hopkinson, Leslie; Soeder, Daniel J

    2016-11-01

    Surface water is at risk from Marcellus Shale operations because of chemical storage on drill pads during hydraulic fracturing operations, and the return of water high in total dissolved solids (up to 345 g/L) from shale gas production. This research evaluated how two commercial, off-the-shelf water quality sensors responded to simulated surface water pollution events associated with Marcellus Shale development. First, peak concentrations of contaminants from typical spill events in monitored watersheds were estimated using regression techniques. Laboratory measurements were then conducted to determine how standard in-stream instrumentation that monitor conductivity, pH, temperature, and dissolved oxygen responded to three potential spill materials: ethylene glycol (corrosion inhibitor), drilling mud, and produced water. Solutions ranging from 0 to 50 ppm of each spill material were assessed. Over this range, the specific conductivity increased on average by 19.9, 27.9, and 70 μS/cm for drilling mud, ethylene glycol, and produced water, respectively. On average, minor changes in pH (0.5-0.8) and dissolved oxygen (0.13-0.23 ppm) were observed. While continuous monitoring may be part of the strategy for detecting spills to surface water, these minor impacts to water quality highlight the difficulty in detecting spill events. When practical, sensors should be placed at the mouths of small watersheds where drilling activities or spill risks are present, as contaminant travel distance strongly affects concentrations in surface water systems.

  2. Improved monitoring framework for local planning in the water, sanitation and hygiene sector: From data to decision-making.

    Science.gov (United States)

    Garriga, Ricard Giné; de Palencia, Alejandro Jiménez Fdez; Foguet, Agustí Pérez

    2015-09-01

    Today, a vast proportion of people still lack a simple pit latrine and a source of safe drinking water. To help end this appalling state of affairs, there is a pressing need to provide policymakers with evidences which may be the basis of effective planning, targeting and prioritization. Two major challenges often hinder this process: i) lack of reliable data to identify which areas are most in need; and ii) inadequate instruments for decision-making support. In tackling previous shortcomings, this paper proposes a monitoring framework to compile, analyze, interpret and disseminate water, sanitation and hygiene information. In an era of decentralization, where decision-making moves to local governments, we apply such framework at the local level. The ultimate goal is to develop appropriate tools for decentralized planning support. To this end, the study first implements a methodology for primary data collection, which combines the household and the waterpoint as information sources. In doing so, we provide a complete picture of the context in which domestic WASH services are delivered. Second, the collected data are analyzed to underline the emerging development challenges. The use of simple planning indicators serves as the basis to i) reveal which areas require policy attention, and to ii) identify the neediest. Third, a classification process is proposed to prioritize among various populations. Three different case studies from East and Southern African countries are presented. Results indicate that accurate and comprehensive data, if adequately exploited through simple instruments, may be the basis of effective targeting and prioritization, which are central to sector planning. The application of the proposed framework in the real world, however, is to a certain extent elusive; and we point out to conclude two specific challenges that remain unaddressed, namely the upgrade of existing decision-making processes to enhance transparency and inclusiveness, and the

  3. Procedimiento para planificar el monitoreo ambiental en empresas hoteleras. Procedure for environmental monitoring plan for the hotel companies

    OpenAIRE

    Laureano José López Moreda; Mariela Almeida Rodrígues; Yohandra de Armas Vargas; Lisbet Alonso Tamayo

    2012-01-01

    Resumen:La gestión ambiental empresarial ha devenido en instrumento de valor estratégico para las empresas hoteleras. Para garantizar su aplicación exitosa resulta vital el desarrollo de programas de monitoreo ambiental. Por tal motivo, el presente artículo se traza como objetivo general desarrollar un procedimiento para elaborar programas de monitoreo ambiental en estas empresas. La aplicación de diferentes métodos empíricos de investigaci&oac...

  4. Procedimiento para planificar el monitoreo ambiental en empresas hoteleras. Procedure for environmental monitoring plan for the hotel companies

    OpenAIRE

    Laureano José López Moreda; Mariela Almeida Rodrígues; Yohandra de Armas Vargas; Lisbet Alonso Tamayo

    2012-01-01

    Resumen:La gestión ambiental empresarial ha devenido en instrumento de valor estratégico para las empresas hoteleras. Para garantizar su aplicación exitosa resulta vital el desarrollo de programas de monitoreo ambiental. Por tal motivo, el presente artículo se traza como objetivo general desarrollar un procedimiento para elaborar programas de monitoreo ambiental en estas empresas. La aplicación de diferentes métodos empíricos de investigaci&oac...

  5. TWRS privatization: Phase I monitoring well engineering study and decommissioning plan

    Energy Technology Data Exchange (ETDEWEB)

    Williams, B.A.

    1996-09-11

    This engineering study evaluates all well owners and users, the status or intended use of each well, regulatory programs, and any future well needs or special purpose use for wells within the TWRS Privatization Phase I demonstration area. Based on the evaluation, the study recommends retaining 11 of the 21 total wells within the demonstration area and decommissioning four wells prior to construction activities per the Well Decommissioning Plan (WHC-SD-EN-AP-161, Rev. 0, Appendix I). Six wells were previously decommissioned.

  6. Tank monitor and control system (TMACS) year 2000 compliance project plan

    Energy Technology Data Exchange (ETDEWEB)

    HOLM, M.J.

    1999-06-24

    The purpose of this document is to describe tests performed to validate Revision 11 of the Tank Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  7. Application of a new laser Doppler imaging system in planning and monitoring of surgical flaps

    Science.gov (United States)

    Schlosser, Stefan; Wirth, Raphael; Plock, Jan A.; Serov, Alexandre; Banic, Andrej; Erni, Dominique

    2010-05-01

    There is a demand for technologies able to assess the perfusion of surgical flaps quantitatively and reliably to avoid ischemic complications. The aim of this study is to test a new high-speed high-definition laser Doppler imaging (LDI) system (FluxEXPLORER, Microvascular Imaging, Lausanne, Switzerland) in terms of preoperative mapping of the vascular supply (perforator vessels) and postoperative flow monitoring. The FluxEXPLORER performs perfusion mapping of an area 9×9 cm with a resolution of 256×256 pixels within 6 s in high-definition imaging mode. The sensitivity and predictability to localize perforators is expressed by the coincidence of preoperatively assessed LDI high flow spots with intraoperatively verified perforators in nine patients. 18 free flaps are monitored before, during, and after total ischemia. 63% of all verified perforators correspond to a high flow spot, and 38% of all high flow spots correspond to a verified perforator (positive predictive value). All perfused flaps reveal a value of above 221 perfusion units (PUs), and all values obtained in the ischemic flaps are beneath 187 PU. In summary, we conclude that the present LDI system can serve as a reliable, fast, and easy-to-handle tool to detect ischemia in free flaps, whereas perforator vessels cannot be detected appropriately.

  8. The data quality monitoring challenge at CMS experience from first collisions and future plans

    CERN Document Server

    De Guio, Federico

    2015-01-01

    The Data Quality Monitoring (DQM) Software is a central tool in the CMS experiment. Its robustness and flexibility is critical for monitoring detector performance and providing fast and comprehensive feedback centrally for the experiment in real-time (Online DQM), after a full event processing with fine-grained analysis (Offline DQM), and as a validation tool to validate both the CMS software (CMSSW), calibration and alignment scenarios and extensive simulations. The entire DQM framework has undergone fundamental changes, and the first performance results of this newly updated system will be presented in the context of the first proton-proton collisions for CERNs Large Hadron Collider at a center of mass energy of 13 TeV. These results will encapsulate the performance of the CMS detector in the context of the upgraded DQM system that makes available more sophisticated methods for evaluating data quality, as well as a dedicated review of the technical challenges and improvements specific to the DQM framework i...

  9. Groundwater quality sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of energy and managed by martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  10. Groundwater Quality Sampling and Analysis Plan for Environmental Monitoring Waste Area Grouping 6 at Oak Ridge National Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  11. The National Water-Quality Assessment (NAWQA) Program planned monitoring and modeling activities for Texas, 2013–23

    Science.gov (United States)

    Ging, Patricia

    2013-01-01

    The U.S. Geological Survey’s (USGS) National Water-Quality Assessment (NAWQA) Program was established by Congress in 1992 to answer the following question: What is the status of the Nation’s water quality and is it getting better or worse? Since 1992, NAWQA has been a primary source of nationally consistent data and information on the quality of the Nation’s streams and groundwater. Data and information obtained from objective and nationally consistent water-quality monitoring and modeling activities provide answers to where, when, and why the Nation’s water quality is degraded and what can be done to improve and protect it for human and ecosystem needs. For NAWQA’s third decade (2013–23), a new strategic Science Plan has been developed that describes a strategy for building upon and enhancing the USGS’s ongoing assessment of the Nation’s freshwater quality and aquatic ecosystems.

  12. Absence of erythroblast macrophage protein (Emp) leads to failure of erythroblast nuclear extrusion.

    Science.gov (United States)

    Soni, Shivani; Bala, Shashi; Gwynn, Babette; Sahr, Kenneth E; Peters, Luanne L; Hanspal, Manjit

    2006-07-21

    In mammals, the functional unit for definitive erythropoiesis is the erythroblastic island, a multicellular structure composed of a central macrophage surrounded by developing erythroblasts. Erythroblast-macrophage interactions play a central role in the terminal maturation of erythroblasts, including enucleation. One possible mediator of this cell-cell interaction is the protein Emp (erythroblast macrophage protein). We used targeted gene inactivation to define the function of Emp during hematopoiesis. Emp null embryos die perinatally and show profound alterations in the hematopoietic system. A dramatic increase in the number of nucleated, immature erythrocytes is seen in the peripheral blood of Emp null fetuses. In the fetal liver virtually no erythroblastic islands are observed, and the number of F4/80-positive macrophages is substantially reduced. Those present lack cytoplasmic projections and are unable to interact with erythroblasts. Interestingly, wild type macrophages can bind Emp-deficient erythroblasts, but these erythroblasts do not extrude their nuclei, suggesting that Emp impacts enucleation in a cell autonomous fashion. Previous studies have implicated the actin cytoskeleton and its reorganization in both erythroblast enucleation as well as in macrophage development. We demonstrate that Emp associates with F-actin and that this interaction is important in the normal distribution of F-actin in both erythroblasts and macrophages. Thus, Emp appears to be required for erythroblast enucleation and in the development of the mature macrophages. The availability of an Emp null model provides a unique experimental system to study the enucleation process and to evaluate the function of macrophages in definitive erythropoiesis.

  13. ADVANCED MR IMAGING METHODS FOR PLANNING AND MONITORING RADIATION THERAPY IN PATIENTS WITH HIGH GRADE GLIOMA

    Science.gov (United States)

    Lupo, Janine M.; Nelson, Sarah J.

    2016-01-01

    This review explores how the integration of advanced imaging methods with high quality anatomic images significantly improves the characterization, target definition, assessment of response to therapy, and overall management of patients with high-grade glioma. Metrics derived from diffusion, perfusion, and susceptibility weighted MR imaging in conjunction with MR spectroscopic imaging, allows us to characterize regions of edema, hypoxia, increased cellularity, and necrosis within heterogeneous tumor and surrounding brain tissue. Quantification of such measures may provide a more reliable initial representation of tumor delineation and response to therapy than changes in the contrast enhancing or T2 lesion alone and have a significant impact on targeting resection, planning radiation, and assessing treatment effectiveness. In the long-term, implementation of these imaging methodologies can also aid in the identification of recurrent tumor and its differentiation from treatment-related confounds and facilitate the detection of radiation-induced vascular injury in otherwise normal appearing brain tissue. PMID:25219809

  14. Long-term monitoring of UK river basins: the disconnections between the timescales of hydrological processes and watershed management planning

    Science.gov (United States)

    Howden, N. J. K.; Burt, T.; Worrall, F.

    2016-12-01

    The UK has a wealth of hydrological monitoring data that has both good coverage in space since the early 1970s, and also a few locations where records have been kept continuously for almost 150 years. Such datasets offer unique opportunities for the hydrologist to consider how the concepts of stationarity, change, and definitions of "baseline" resources should be used to shape how we build models of these systems, and how we devise appropriate and sustainable watershed management strategies. In this paper we consider some of the UK's longest hydrological and biogeochemical records, to explore how long records can be used to shape such understanding and, in some cases, how they can be used to identify new modes of behaviour that need to be incorporated into management planning, from the scale of individual watersheds right up to the national scale. We also consider how key timescales of hydrological responses that are evident within the data may pose major problems for watershed management unless appropriate attention is paid to the potential impacts of processes that work over decadal timescales - much longer than sub-decadal water industry investment cycles or short-term projects for watershed management planning. We use our long-term records to show how key processes can be identified, and to illustrate how careful interpretation of shorter term records will improve decision-making for water resource management.

  15. OpenGIS System to Monitor the Impact of Spatial Planning Policies

    Directory of Open Access Journals (Sweden)

    ANTONIO TACHE

    2008-01-01

    Full Text Available Based on the studies of European experience in spatial planning (policies, strategies, indicators, the project aims to create two databases for Romania, one at region level and one at the level of the administrative-territorial unit, in OpenGIS system using adequate indicators allowing for the identification and measurement of socio-economic development trends in a spatial context. To achieve this, competent studies will look at the differences between the European territorial indicators (EUROSTAT, ESPON and the national ones, level NUTS II, or NUTS V. Following the identification of the two sets of territorial indicators, the structure of alphanumeric databases will be conceived in GIS. Concomitantly with the NUTS V digital map of Romania, alphanumeric databases will be fed with statistical data according to proposed territorial indicators schemes. Proposed model will be tested on territorial analyses by groups of indicators. The novelty consists in the spatial planning approach based on the conjunction between GIS and mathematical methods of evaluation and prognosis, the transposition of the mathematical method in a TurboC++ program, and the integration in the proposed system. Based on the results, NUTS II and NUTS V territorial indicators will be classified in groups, in charts and maps underlining socio-economic development disparities at national level. The GISTEREG project is conceived to be integrated into the OpenGIS database proposed by ESPON, aiming at a fast quantification of European regional policies. This is why the structure of the database will be conceived in accordance with EUROSTAT, level NUTS V, and ESPON and the Regional Operational Program – Priority Axis VI, level NUTS II. The proposed GISTEREG model, due to the mathematical component integrated into the system will be able to diagnose the main existing challenges and forecast the development of regions and zones within Romania. Databases obtained and presented in Open

  16. The Northwest Geysers EGS Demonstration Project Phase 1: Pre-stimulation coupled geomechanical modeling to guide stimulation and monitoring plans

    Energy Technology Data Exchange (ETDEWEB)

    Rutqvist, J.; Dobson, P.F.; Oldenburg, C.M.; Garcia, J.; Walters, M.

    2010-10-20

    This paper presents activities and results associated with Phase 1 (pre-stimulation phase) of an Enhanced Geothermal System (EGS) demonstration project at the northwest part of The Geysers geothermal field, California. The paper presents development of a 3-D geological model, coupled thermal-hydraulic-mechanical (THM) modeling of proposed stimulation injection as well as current plans for stimulation and monitoring of the site. The project aims at creating an EGS by directly and systematically injecting cool water at relatively low pressure into a known High Temperature (about 280 to 350 C) Zone (HTZ) located under the conventional (240 C) steam reservoir at depths of {approx}3 km. Accurate micro-earthquake monitoring initiated before the start of the injection will be used as a tool for tracking the development of the EGS and monitoring changes in microseismicity. We first analyzed historic injection and micro-earthquake data from an injection well (Aidlin 11) located about 3 miles to the west of the new EGS demonstration area. Thereafter, we used the same modeling approach to predict the likely extent of the zone of enhanced permeability for a proposed initial injection in two wells (Prati State 31 and Prati 32) at the new EGS demonstration area. Our modeling indicates that the proposed injection scheme will provide additional steam production in the area by creating a zone of permeability enhancement extending about 0.5 km from each injection well which will connect to the overlying conventional steam reservoir, in agreement with the conclusions of Nielson and Moore (2000).

  17. Inspection and monitoring plan, contaminated groundwater seeps 317/319/ENE Area, Argonne National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-11

    During the course of completing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) in the 317/319/East-Northeast (ENE) Area of Argonne National Laboratory-East (ANL-E), groundwater was discovered moving to the surface through a series of groundwater seeps. The seeps are located in a ravine approximately 600 ft south of the ANL-E fence line in Waterfall Glen Forest Preserve. Samples of the seep water were collected and analyzed for selected parameters. Two of the five seeps sampled were found to contain detectable levels of organic contaminants. Three chemical species were identified: chloroform (14--25 {micro}g/L), carbon tetrachloride (56--340 {micro}g/L), and tetrachloroethylene (3--6 {micro}g/L). The other seeps did not contain detectable levels of volatile organics. The nature of the contaminants in the seeps will also be monitored on a regular basis. Samples of surface water flowing through the bottom of the ravine and groundwater emanating from the seeps will be collected and analyzed for chemical and radioactive constituents. The results of the routine sampling will be compared with the concentrations used in the risk assessment. If the concentrations exceed those used in the risk assessment, the risk calculations will be revised by using the higher numbers. This revised analysis will determine if additional actions are warranted.

  18. EMP combination chemotherapy and low-dose monotherapy in advanced prostate cancer.

    Science.gov (United States)

    Kitamura, Tadaichi; Nishimatsu, Hiroaki; Hamamoto, Toshiaki; Tomita, Kyoichi; Takeuchi, Takumi; Ohta, Nobutaka

    2002-02-01

    Many chemotherapeutic regimens combined with estramustine phosphate (EMP) have been elaborated for the treatment of hormone-refractory prostate cancer over 30 years. However, older EMP-based combination chemotherapies with vinblastine, vinorelbine, doxorubicin or cyclophosphamide showed relatively low PSA response rate (25-58%) accompanied with high toxicities. On the other hand, newly developed EMP-based combination regimens with etoposide, pacitaxel, carboplatin or docetaxel demonstrated promising PSA response rate (43-77%) with moderate to severe toxicity in the rate of thromboembolic event (5-18%) and of neutropenia (9-41%). Treatment-related death was less in the latter combination group (5/615, 0.8%) than that in the former group (3/234, 1.3%). Of note, in the docetaxel combination with EMP, PSA response rate is as high as 77% with high rate (41%) of neutropenia but no treatment-related death was observed. Docetaxel combination with EMP seems to be the best regimen, though not completely justified by randomized trials, to be selected in the modern era, which will be followed by paclitaxel, carboplatin and EMP combination with PSA response rate of 71%. In addition, an interim report in 83 patients was presented. They were not consecutively enrolled but were treated on low-dose EMP monotherapy for previously untreated advanced prostate cancer in Department of Urology of Tokyo University and our 21 affiliated hospitals. Overall PSA response rate was as high as 93.4% out of 76 assessable patients. However, overall toxicity rate was abnormally high (39.5%) with drug discontinuation rate of 32.1%. The reason of low drug compliance may be attributed to gastrointestinal symptoms. To overcome the low drug compliance, appropriate patients for EMP administration should be selected by using gene analysis on the basis of sophisticated tailor-made medicine.

  19. Analysis of a Van de Graaff Generator for EMP Direct Current Survivability Testing

    Science.gov (United States)

    2013-03-01

    13.82 (A) at a spark gap of 3″ to 354 ± 22.10 (A) for a spark gap of 8″. Using the settings explored in this thesis, the VDG has some value for use ...7 2.2 High Altitude Electromagnetic Pulse ( HEMP ) ................................................. 11 2.3 Dielectric Breakdown of Air...situation that results in High Altitude EMP ( HEMP ) [9]. .............. 11 Figure 7. The magnitude of EMP, lighting and electrostatic discharge [2

  20. Planning the improvement of seismic monitoring in a volcanic supersite: experience on Mt. Etna

    Science.gov (United States)

    D'Alessandro, Antonino; Scarfi, Luciano; Scaltrito, Antonio; Aiesi, Giampiero; Di Prima, Sergio; Ferrari, Ferruccio; Rapisarda, Salvatore

    2013-04-01

    Etna is one of the most active volcanoes in the world and one of the most intriguing natural laboratories for the understanding of eruptive processes and lava uprising in basalt-type volcanic environments; indeed, it is considered, by the scientific international community, together with the Vesuvius and the Hawaiian Islands, as a volcanic supersite. Its activity is continuously monitored by the Osservatorio Etneo of the Istituto Nazionale di Geofisica e Vulcanologia (INGV), by means of an array of integrated multidisciplinary techniques. In particular, Etna seismicity is recorded by a dense local seismic network (ESN- Etna Seismic Network), which, nowadays, consists of about 40 real-time seismic stations, many of which equipped with broadband velocity and accelerometer sensors. The data are analyzed routinely in detail by the Osservatorio Etneo staff, producing daily and periodic reports and bulletins of the earthquakes located in the whole Sicily and southern Calabria region. In the last decades, seismological observations provided important information on both the dynamics and internal structure of the volcano, in addition to their interaction with the regional tectonic structures. In the last year, in the framework of the VULCAMED project, an INGV workgroup has taken on the task of developing the existing seismic network through the installation of new measurement stations. By considering the spatial distribution of earthquakes in the area, the presence of structures known as seismically active and through extensive geological-geophysical surveys, ten potential new sites were identified. In the following months, some of these sites will complement the existing network. The choice of optimal sites must clearly be made through a careful analysis of environmental noise, of the possible logistics, technical and broadcast problems, but must also take into account the geometry of the existing seismic network. For this purpose, we applied the Seismic Network

  1. Developing a monitoring and evaluation framework to integrate and formalize the informal waste and recycling sector: the case of the Philippine National Framework Plan.

    Science.gov (United States)

    Serrona, Kevin Roy B; Yu, Jeongsoo; Aguinaldo, Emelita; Florece, Leonardo M

    2014-09-01

    The Philippines has been making inroads in solid waste management with the enactment and implementation of the Republic Act 9003 or the Ecological Waste Management Act of 2000. Said legislation has had tremendous influence in terms of how the national and local government units confront the challenges of waste management in urban and rural areas using the reduce, reuse, recycle and recovery framework or 4Rs. One of the sectors needing assistance is the informal waste sector whose aspiration is legal recognition of their rank and integration of their waste recovery activities in mainstream waste management. To realize this, the Philippine National Solid Waste Management Commission initiated the formulation of the National Framework Plan for the Informal Waste Sector, which stipulates approaches, strategies and methodologies to concretely involve the said sector in different spheres of local waste management, such as collection, recycling and disposal. What needs to be fleshed out is the monitoring and evaluation component in order to gauge qualitative and quantitative achievements vis-a-vis the Framework Plan. In the process of providing an enabling environment for the informal waste sector, progress has to be monitored and verified qualitatively and quantitatively and measured against activities, outputs, objectives and goals. Using the Framework Plan as the reference, this article developed monitoring and evaluation indicators using the logical framework approach in project management. The primary objective is to institutionalize monitoring and evaluation, not just in informal waste sector plans, but in any waste management initiatives to ensure that envisaged goals are achieved.

  2. Did high-altitude EMP (electromagnetic pulse) cause the Hawaiian streetlight incident

    Energy Technology Data Exchange (ETDEWEB)

    Vittitoe, C N

    1989-04-01

    Studies of electromagnetic pulse (EMP) effects on civilian and military systems predict results ranging from severe destruction to no damage. Convincing analyses that support either extreme are rare. The Hawaiian streetlight incident associated with the Starfish nuclear burst is the most widely quoted observed damage. We review the streetlight characteristics and estimate the coupling between the Starfish EMP and a particular streetlight circuit identified as one of the few that failed. Evidence indicates that the damage was EMP-generated. The main contributing factors were the azimuthal angle of the circuit relative to the direction of EMP propagation, and the rapid rise of the EMP signal. The azimuthal angle provided coherent buildup of voltage as the EMP swept across the transmission line. The rapid rise allowed substantial excitation before the canceling effects of ground reflections limited the signals. Resulting voltages were at the threshold for causing the observed fuse damage and are consistent with this damage occurring in only some of the strings in the systems. 15 refs., 16 figs., 4 tabs.

  3. EMP-1 is a junctional protein in a liver stem cell line and in the liver.

    Science.gov (United States)

    Lee, Hsuan-Shu; Sherley, James L; Chen, Jeremy J W; Chiu, Chien-Chang; Chiou, Ling-Ling; Liang, Ja-Der; Yang, Pan-Chyr; Huang, Guan-Tarn; Sheu, Jin-Chuan

    2005-09-09

    In an attempt to discover cell markers for liver stem cells, a cDNA microarray analysis was carried out to compare the gene expression profiles between an adult liver stem cell line, Lig-8, and mature hepatocytes. Several genes in the categories of extracellular matrix, cell membrane, cell adhesion, transcription factor, signal molecule, transporter, and metabolic enzyme were shown to be differentially expressed in Lig-8 cells. Among them, epithelial membrane protein (EMP)-1 has been previously implicated with stem cell phenotypes. Antiserum to EMP-1 was produced to localize its expression. On monolayers of Lig-8 cells, EMP-1 was expressed along the intercellular border. In the liver harboring proliferating oval cells, the liver progenitors, EMP-1 was localized as ribbon bands, a staining pattern for epithelial junctions, all the way through bile duct epithelia, oval cell ductules, and into peri-hepatocytic regions. These peri-hepatocytic regions were proved to be bile canaliculi by co-localization of EMP-1 and dipeptidyl peptidase IV, an enzyme located on bile canaliculi. This report is the first to indicate EMP-1 to be a junctional protein in the liver.

  4. Iron-regulated biofilm formation in Staphylococcus aureus Newman requires ica and the secreted protein Emp.

    Science.gov (United States)

    Johnson, Miranda; Cockayne, Alan; Morrissey, Julie A

    2008-04-01

    Staphylococcus aureus biofilm formation is induced in iron-restricted growth conditions in vitro. In this study, we showed that Emp and Eap play important roles in low-iron-induced biofilm formation of S. aureus Newman. Eap and Emp are secreted proteins which are non-covalently attached to the S. aureus cell surface and have previously been implicated in a number of aspects of S. aureus pathogenesis. We showed here that the transcription of these important virulence factors is induced by growth in low-iron medium, reflective of the in vivo environment. Our results show that iron regulation of Eap and Emp is Fur independent. However, Fur is required for full induction of eap and emp expression in low-iron conditions. In this study, we demonstrated that in addition to Fur, low-iron-induced biofilm formation requires Sae, Agr, and SarA. In iron-restricted growth conditions, Sae and Agr are essential for Emp and Eap expression and hence for biofilm formation, whereas SarA appears to have a less-significant role. We also showed that expression of the ica operon is required for biofilm formation in iron-restricted growth conditions. We demonstrated that in fact, ica is required for the expression of the important multifunctional virulence determinants eap and emp.

  5. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  6. Emp is a component of the nuclear matrix of mammalian cells and undergoes dynamic rearrangements during cell division.

    Science.gov (United States)

    Bala, Shashi; Kumar, Ajay; Soni, Shivani; Sinha, Sudha; Hanspal, Manjit

    2006-04-21

    Emp, originally detected in erythroblastic islands, is expressed in numerous cell types and tissues suggesting a functionality not limited to hematopoiesis. To study the function of Emp in non-hematopoietic cells, an epitope-tagged recombinant human Emp was expressed in HEK cells. Preliminary studies revealed that Emp partitioned into both the nuclear and Triton X-100-insoluble cytoskeletal fractions in approximately a 4:1 ratio. In this study, we report investigations of Emp in the nucleus. Sequential extractions of interphase nuclei showed that recombinant Emp was present predominantly in the nuclear matrix. Immunofluorescence microscopy showed that Emp was present in typical nuclear speckles enriched with the spliceosome assembly factor SC35 and partially co-localized with actin staining. Coimmunoprecipitation and GST-pull-down assays confirmed the apparent close association of Emp with nuclear actin. During mitosis, Emp was detected at the mitotic spindle/spindle poles, as well as in the contractile ring during cytokinesis. These results suggest that Emp undergoes dynamic rearrangements within the nuclear architecture that are correlated with cell division.

  7. The Establishment of Object Selection Criteria for Effect Analysis of Electromagnetic Pulse (EMP) in Operating Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Ye, Song Hae; Ryu, Hosun; Kim, Minyi; Lee, Euijong [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The electromagnetic pulse (EMP) can be used as a strategic weapon by inducing damaging voltage and currents that the electrical circuits are not designed to withstand. EMPs are lethal to electronic systems. All EMP events have three common components: a source, coupling path, and receptor. It can also travel across power grids, destroying electronics as it passes in less than a second. There have been no research studies on the effect analysis for EMP in domestic nuclear power plants and power grids. To ensure the safety of operating nuclear power plants in this environment, the emission of EMP is needed for the effect analysis and safety measures against EMPs. Actually, it is difficult and inefficient to conduct the effect analysis of EMP with all the equipment and systems in nuclear power plants (NPPs). Therefore, this paper presents the results of establishing the object selection criteria for the effect analysis of EMP in operating nuclear power plants through reviewing previous research in the US and the safety related design concepts in domestic NPPs. It is not necessary to ensure the continued operation of the plant in intense multiple EMP environments. The most probable effect of EMP on a modern nuclear power plant is an unscheduled shutdown. EMP may also cause an extended shutdown by the unnecessary activation of some safety related systems. In general, EMP can be considered a nuisance to nuclear plants, but it is not considered a serious threat to plant safety. The results of EMP effect analysis show less possibility of failure in the tested individual equipment. It was also confirmed that there is no possibility of simultaneous failure for devices in charge of the safety shutdown in the NPP.

  8. The Role of Imaging in Patient Selection, Preoperative Planning, and Postoperative Monitoring in Human Upper Extremity Allotransplantation

    Science.gov (United States)

    Roth, Eira S.; Buck, David G.; Gorantla, Vijay S.; Losee, Joseph E.; Foust, Daniel E.; Britton, Cynthia A.

    2014-01-01

    Objective. To describe the role of imaging in vascular composite allotransplantation based on one institution's experience with upper extremity allotransplant patients. Methods. The institutional review board approved this review of HIPAA-compliant patient data without the need for individual consent. A retrospective review was performed of imaging from 2008 to 2011 on individuals undergoing upper extremity transplantation. This demonstrated that, of the 19 patients initially considered, 5 patients with a mean age of 37 underwent transplantation. Reports were correlated clinically to delineate which preoperative factors lead to patient selection versus disqualification and what concerns dictated postoperative imaging. Findings were subdivided into musculoskeletal and vascular imaging criterion. Results. Within the screening phase, musculoskeletal exclusion criterion included severe shoulder arthropathy, poor native bone integrity, and marked muscular atrophy. Vascular exclusion criterion included loss of sufficient arterial or venous supply and significant distortion of the native vascular architecture. Postoperative imaging was used to document healing and hardware integrity. Postsurgical angiography and ultrasound were used to monitor for endothelial proliferation or thrombosis as signs of rejection and vascular complication. Conclusion. Multimodality imaging is an integral component of vascular composite allotransplantation surgical planning and surveillance to maximize returning form and functionality while minimizing possible complications. PMID:24800056

  9. The Role of Imaging in Patient Selection, Preoperative Planning, and Postoperative Monitoring in Human Upper Extremity Allotransplantation

    Directory of Open Access Journals (Sweden)

    Eira S. Roth

    2014-01-01

    Full Text Available Objective. To describe the role of imaging in vascular composite allotransplantation based on one institution’s experience with upper extremity allotransplant patients. Methods. The institutional review board approved this review of HIPAA-compliant patient data without the need for individual consent. A retrospective review was performed of imaging from 2008 to 2011 on individuals undergoing upper extremity transplantation. This demonstrated that, of the 19 patients initially considered, 5 patients with a mean age of 37 underwent transplantation. Reports were correlated clinically to delineate which preoperative factors lead to patient selection versus disqualification and what concerns dictated postoperative imaging. Findings were subdivided into musculoskeletal and vascular imaging criterion. Results. Within the screening phase, musculoskeletal exclusion criterion included severe shoulder arthropathy, poor native bone integrity, and marked muscular atrophy. Vascular exclusion criterion included loss of sufficient arterial or venous supply and significant distortion of the native vascular architecture. Postoperative imaging was used to document healing and hardware integrity. Postsurgical angiography and ultrasound were used to monitor for endothelial proliferation or thrombosis as signs of rejection and vascular complication. Conclusion. Multimodality imaging is an integral component of vascular composite allotransplantation surgical planning and surveillance to maximize returning form and functionality while minimizing possible complications.

  10. Directors' duty of care to monitor information systems in HMOs: some lessons from the Oxford Health Plan.

    Science.gov (United States)

    O'Byrne, M E

    This paper examines the legal and strategic issues raised by the use of information systems in health maintenance organizations (HMOs) and other managed care organizations. Given the critical nature of information systems to an HMO's business success and regulatory compliance, the large financial investment HMOs make in their systems, and the widely publicized concerns over the year 2000 "millennium bug" problem, information systems are appropriately a matter of concern to an HMO's board of directors. The recent experience of Oxford Health Plans, Inc. offers a case study in the apparent failure of the directors to monitor adequately the in-house development of an information system. The systems disaster which this corporation suffered in 1997 led to a dramatic drop in stock price, from which the company has yet to recover, as well as intense scrutiny by state and federal regulators and countless shareholder derivative actions against the directors. Corporate directors are subject to the fiduciary duty of care. Despite statutes in some states requiring directors to act prudently, state courts almost always apply the standard of gross negligence. As a result, even when directors act without due deliberation in their decision, it is rare that a court will find them to have failed in their duty of care. The business and regulatory community may find otherwise, however, when directors fail to evaluate information systems options carefully and the business suffers as a result.

  11. The role of imaging in patient selection, preoperative planning, and postoperative monitoring in human upper extremity allotransplantation.

    Science.gov (United States)

    Roth, Eira S; Buck, David G; Gorantla, Vijay S; Losee, Joseph E; Foust, Daniel E; Britton, Cynthia A

    2014-01-01

    Objective. To describe the role of imaging in vascular composite allotransplantation based on one institution's experience with upper extremity allotransplant patients. Methods. The institutional review board approved this review of HIPAA-compliant patient data without the need for individual consent. A retrospective review was performed of imaging from 2008 to 2011 on individuals undergoing upper extremity transplantation. This demonstrated that, of the 19 patients initially considered, 5 patients with a mean age of 37 underwent transplantation. Reports were correlated clinically to delineate which preoperative factors lead to patient selection versus disqualification and what concerns dictated postoperative imaging. Findings were subdivided into musculoskeletal and vascular imaging criterion. Results. Within the screening phase, musculoskeletal exclusion criterion included severe shoulder arthropathy, poor native bone integrity, and marked muscular atrophy. Vascular exclusion criterion included loss of sufficient arterial or venous supply and significant distortion of the native vascular architecture. Postoperative imaging was used to document healing and hardware integrity. Postsurgical angiography and ultrasound were used to monitor for endothelial proliferation or thrombosis as signs of rejection and vascular complication. Conclusion. Multimodality imaging is an integral component of vascular composite allotransplantation surgical planning and surveillance to maximize returning form and functionality while minimizing possible complications.

  12. TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241-AY-101 MULTI-PROBE CORROSION MONITORING SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    WYRWAS RB; PAGE JS; COOKE GS

    2012-04-19

    This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 and in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.

  13. Quality Assurance Project Plan for the Environmental Monitoring Program in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    Waste Area Grouping (WAG) 6 is a hazardous and low-level radioactive waste disposal site at Oak Ridge National Laboratory (ORNL). Extensive site investigations have revealed contaminated surface water, sediments, groundwater, and soils. Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) conducted from 1989--1991 and on recent interactions with the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), a decision was made to defer implementing source control remedial measures at the WAG. The information shows WAG 6 contributes < 2% of the total off-site contaminant risk released over White Oak Dam (WOD). The alternative selected to address hazards at WAG 6 involves maintenance of site access controls to prevent public exposure to on-site contaminants, continued monitoring of contaminant releases to determine if source control measures will be required in the future, and development of technologies to support final remediation of WAG 6. This Quality Assurance Project Plan (QAPjP) has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (DOE/OR/01-1192&D1). Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model. The baseline monitoring phase is expected to begin in 1994 and continue for 12-18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC. The routine annual monitoring phase will continue for {approximately}4 years.

  14. Integrating ADDIE Instructional Design Models into EMP Teaching%ADDIE 模型在 EMP 教学中的实践研究

    Institute of Scientific and Technical Information of China (English)

    郭书法; 权继振; 汪田田

    2013-01-01

      介绍了国内外关教学设计及其模型的相关研究,把ADDIE教学设计模型引入EMP(English for Medical Purposes)教学,旨在分析个变量之间的关系,优化课堂教学效果。通过ADDIE教学设计模型在EMP教学中的实践研究,探讨了EMP教学中ADDIE教学设计模型各要素的内涵和相互关系。研究发现ADDIE教学设计模型在EMP的教学卓有成效,同时指出EMP作为语言的特殊性,ADDIE教学设计环节的动态变化和ADDIE教学设计模型的生成性、回应性及验证性等内在特点。%After introducing some domestic and overseas researches about the instructional design , this paper integrates ADDIE instructional model into EMP (English for Medical Purposes ) teaching and demonstrates the key elements and their re-lationship in medical students teaching procedure by conducting the case study of ADDIE model in EMP teaching .The results of EMP teaching with ADDIE instructional model are satisfying , the author also suggests that EMP teaching is special in ADDIE model because it is a language teaching process , all the elements in ADDIE model are dynamic and ADDIE instructional model is a generative, responsive and validating process .

  15. Development of Design Information Template for Nuclear Power Plants for Electromagnetic Pulse (EMP) Effect Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Minyi; Ryu, Hosan; Ye, Songhae; Lee, Euijong [KNHP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    An electromagnetic pulse (EMP) is a transient electromagnetic shock wave that has powerful electric and magnetic fields that can destroy electronic equipment. It is generally well-known that EMPs can cause the malfunction and disorder of electronic equipment and serious damages to electric power systems and communication networks. Research is being carried out to protect nuclear power plants (NPPs) from EMP threats. Penetration routes of EMPs can be roughly categorized into two groups, radioactivity and conductivity. The radioactive effect refers to an impact transmitted to the ground from high-altitude electromagnetic pulses (HEMP). Such an impact may affect target equipment through the point of entry (POE) of the concrete structure of an NPP. The conductive effect refers to induced voltage or current coupled to the NPPs cable structure. The induced voltage and current affect the target equipment via connected cables. All these factors must be considered when taking into account EMP effect analysis for NPPs. To examine all factors, it is necessary to fully understand the schemes of NPPs. This paper presents a four type design information template that can be used to analyze the EMP effect in operating nuclear power plants. In order to analyze of the effects of EMPs on operating NPPs, we must consider both the conductive and radioactive effects on the target (system, equipment, structure). For these reasons, not only the equipment information, but also the information about the structure and the external penetration will be required. We are developing a design information template for robust nuclear design information acquisition. We expect to develop a block diagram on the basis of the template.

  16. Hospitalidade Organizacional: Panorama Teórico-Empírico

    Directory of Open Access Journals (Sweden)

    José Alberto Carvalho dos Santos Claro

    2015-10-01

    Full Text Available O objetivo deste texto é o de apresentar as discussões teórico-conceituais sobre Hospitalidade, particularmente a vertente da Hospitalidade Organizacional (HO, que se ocupa das relações hospitaleiras no ambiente do espaço de trabalho. Trata-se de um estudo exploratório, baseado em revisão bibliográfica, seguida de pesquisa de campo por meio de levantamento junto a gestores de pessoas (especialistas ou juízes, sobre o entendimento do tema, visando contribuir para a futura criação de escala de medida para quantificar o grau de HO em uma organização. Como resultado, apresenta-se contribuição teórica para o amadurecimento desta tendência organizacional e indicadores que poderão ser futuramente usados em estudos empíricos e na construção de um instrumento com escala validada para ser utilizada em organizações em qualquer setor de atividade econômica. Palavras-chave: Hospitalidade. Hospitalidade Organizacional. Gestão de Pessoas.Organizational Hospitality: Theorical and Empirical Developments This paper aim is to present the theoretical and conceptual discussions about hospitality, particularly the  Organizational Hospitality (OH, which is concerned with the hospitable relations in the workplace. It’s an exploratory study, based on literature review and field survey with people managers (experts or judges about their understanding about the question. The result indicates that the development of organizational indicators could be used in future empirical studies and to the construction of a validated scale that can be used in any sector of the economic activity. Keywords: Hospitality. Organizational Hospitality. People Management. Indicators.José Alberto Carvalho dos Santos Claro – Doutor. Professor Adjunto da Universidade Federal de São Paulo [UNIFESP], Campus Baixada Santista, Santos, SP. Endereço Lattes http://lattes.cnpq.br/0865792662046289 E-mail: albertoclaro@albertoclaro.pro.br  

  17. Differences in PfEMP1s recognized by antibodies from patients with uncomplicated or severe malaria

    DEFF Research Database (Denmark)

    Duffy, Michael F; Noviyanti, Rintis; Tsuboi, Takafumi;

    2016-01-01

    BACKGROUND: Plasmodium falciparum erythrocyte membrane protein 1 (PfEMP1) variants are encoded by var genes and mediate pathogenic cytoadhesion and antigenic variation in malaria. PfEMP1s can be broadly divided into three principal groups (A, B and C) and they contain conserved arrangements...... of functional domains called domain cassettes. Despite their tremendous diversity there is compelling evidence that a restricted subset of PfEMP1s is expressed in severe disease. In this study antibodies from patients with severe and uncomplicated malaria were compared for differences in reactivity with a range...... of PfEMP1s to determine whether antibodies to particular PfEMP1 domains were associated with severe or uncomplicated malaria. METHODS: Parts of expressed var genes in a severe malaria patient were identified by RNAseq and several of these partial PfEMP1 domains were expressed together with others from...

  18. Apontamentos sobre as bases empíricas do desenvolvimento

    Directory of Open Access Journals (Sweden)

    Dieter Rugard Siedenberg

    2013-03-01

    Full Text Available Neste artigo se procura compreender as bases empíricas sobre as quais se fundamentam as teorias do crescimento e do desenvolvimento socioeconômico. Parte-se do pressuposto de que a concepção contemporânea de desenvolvimento, no contexto das ciências sociais (especialmente, das aplicadas, tem raízes que se alimentaram de, pelo menos, três importantes fontes: as contribuições filosóficas da Grécia Antiga, as práticas políticas vigentes na República e no Império Romano e, por fim, as influências exercidas pela Igreja sobre o modo de produção vigente na sociedade medieval. De forma que a proposta deste artigo é abordar, sucintamente, um conjunto de aspectos considerados significativos que, herdados de cada um desses diferentes contextos históricos, contribuíram para a constituição da concepção de desenvolvimento atualmente vigente. O artigo resulta de apontamentos de leituras e percepções decorrentes de tais leituras, tendo em vista a recuperação de um passado remoto que, de um modo geral, influenciou a história recente da humanidade e, de maneira especial, as teorias econômicas que informam a concepção de desenvolvimento hoje dominante.Palavras-chave | Ciências sociais; crescimento econômico; desenvolvimento; história.Código JEL | B15; O10; P16. NOTES ON THE EMPIRICAL BASIS OF DEVELOPMENTAbstractThis paper seeks to understand the empirical basis on which the theories of growth and socioeconomic development are based. The starting point is the assumption that the contemporary concept of development, in the context of the social sciences (especially of the applied ones, has roots that fed on at least three major sources: the philosophical contributions of ancient Greece, the prevailing political practices in the Republic and the Roman Empire, and finally, the influences exerted by the Church on the production mode prevailing in medieval society. So the purpose of this article is to briefly discuss a number of

  19. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs.

  20. sae is essential for expression of the staphylococcal adhesins Eap and Emp.

    Science.gov (United States)

    Harraghy, Niamh; Kormanec, Jan; Wolz, Christiane; Homerova, Dagmar; Goerke, Christiane; Ohlsen, Knut; Qazi, Saara; Hill, Philip; Herrmann, Mathias

    2005-06-01

    Eap and Emp are two Staphylococcus aureus adhesins initially described as extracellular matrix binding proteins. Eap has since emerged as being important in adherence to and invasion of eukaryotic cells, as well as being described as an immunomodulator and virulence factor in chronic infections. This paper describes the mapping of the transcription start point of the eap and emp promoters. Moreover, using reporter-gene assays and real-time PCR in defined regulatory mutants, environmental conditions and global regulators affecting expression of eap and emp were investigated. Marked differences were found in expression of eap and emp between strain Newman and the 8325 derivatives SH1000 and 8325-4. Moreover, both genes were repressed in the presence of glucose. Analysis of expression of both genes in various regulatory mutants revealed that sarA and agr were involved in their regulation, but the data suggested that there were additional regulators of both genes. In a sae mutant, expression of both genes was severely repressed. sae expression was also reduced in the presence of glucose, suggesting that repression of eap and emp in glucose-containing medium may, in part, be a consequence of a decrease in expression of sae.

  1. Mechanisms involved in the blood-testis barrier increased permeability induced by EMP.

    Science.gov (United States)

    Wang, Xiao-Wu; Ding, Gui-Rong; Shi, Chang-Hong; Zeng, Li-Hua; Liu, Jun-Ye; Li, Jing; Zhao, Tao; Chen, Yong-Bin; Guo, Guo-Zhen

    2010-09-30

    The blood-testis barrier (BTB) plays an important role in male reproductive system. Lots of environmental stimulations can increase the permeability of BTB and then result in antisperm antibody (AsAb) generation, which is a key step in male immune infertility. Here we reported the results of male mice exposed to electromagnetic pulse (EMP) by measuring the expression of tight-junction-associated proteins (ZO-1 and Occludin), vimentin microfilaments, and transforming growth factor-beta (TGF-beta3) as well as AsAb level in serum. Male BALB/c mice were sham exposed or exposed to EMP at two different intensities (200kV/m and 400kV/m) for 200 pulses. The testes were collected at different time points after EMP exposure. Immunofluorescence histocytochemistry, western blotting, laser confocal microscopy and RT-PCR were used in this study. Compared with sham group, the expression of ZO-1 and TGF-beta3 significantly decreased accompanied with unevenly stained vimentin microfilaments and increased serum AsAb levels in EMP-exposed mice. These results suggest a potential BTB injury and immune infertility in male mice exposed to a certain intensity of EMP.

  2. Seeps and springs sampling and analysis plant for the Environmental Monitoring Plan at Waste Area Grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the U.S. Department of Energy and operated by Lockheed Martin Energy System, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources.

  3. Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of various water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants.

  4. Annual Report on Environmental Monitoring Activities for FY 1995 (Baseline Year) at Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This report describes baseline contaminant release conditions for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). The sampling approach and data analysis methods used to establish baseline conditions were presented in ``Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (EMP).`` As outlined in the EMP, the purpose of the baseline monitoring year at WAG 6 was to determine the annual contaminant releases from the site during fiscal year 1995 (FY95) against which any potential changes in releases over time could be compared. The baseline year data set provides a comprehensive understanding of release conditions from all major waste units in the WAG through each major contaminant transport pathway. Due to a mandate to reduce all monitoring work, WAG 6 monitoring was scaled back and reporting efforts on the baseline year results are being minimized. This report presents the quantified baseline year contaminant flux conditions for the site and briefly summarizes other findings. All baseline data cited in this report will reside in the Oak Ridge Environmental Information system (OREIS) database, and will be available for use in future years as the need arises to identify potential release changes.

  5. Role of the Emp Pilus Subunits of Enterococcus faecium in Biofilm Formation, Adherence to Host Extracellular Matrix Components, and Experimental Infection.

    Science.gov (United States)

    Montealegre, Maria Camila; Singh, Kavindra V; Somarajan, Sudha R; Yadav, Puja; Chang, Chungyu; Spencer, Robert; Sillanpää, Jouko; Ton-That, Hung; Murray, Barbara E

    2016-05-01

    Enterococcus faecium is an important cause of hospital-associated infections, including urinary tract infections (UTIs), bacteremia, and infective endocarditis. Pili have been shown to play a role in the pathogenesis of Gram-positive bacteria, including E. faecium We previously demonstrated that a nonpiliated ΔempABC::cat derivative of E. faecium TX82 was attenuated in biofilm formation and in a UTI model. Here, we studied the contributions of the individual pilus subunits EmpA, EmpB, and EmpC to pilus architecture, biofilm formation, adherence to extracellular matrix (ECM) proteins, and infection. We identified EmpA as the tip of the pili and found that deletion of empA reduced biofilm formation to the same level as deletion of the empABC operon, a phenotype that was restored by reconstituting in situ the empA gene. Deletion of empB also caused a reduction in biofilm, while EmpC was found to be dispensable. Significant reductions in adherence to fibrinogen and collagen type I were observed with deletion of empA and empB, while deletion of empC had no adherence defect. Furthermore, we showed that each deletion mutant was significantly attenuated in comparison to the isogenic parental strain, TX82, in a mixed-inoculum UTI model (P Emp pilins are important for E. faecium to cause infection in the urinary tract.

  6. Thoughts on National Environmental Monitoring in"12th Five-Year Plan"%关于"十二五"国家环境监测的思考

    Institute of Scientific and Technical Information of China (English)

    万本太; 蒋火华

    2011-01-01

    根据环境监测面临的新形势和新任务,提出了"十二五"期间做好国家环境监测工作需在九个方面下功夫,并对国家环境监测"十二五"规划的有关内容提出了建议.%Based on the new situation and tasks faced by environmental monitoring field, the article proposed nine aspects which need to put more efforts in during the "12th Five-Year Plan" period and put forward recommendations to the content related to the national environmental monitoring in "12th Five-Year Plan".

  7. Broad Scale Monitoring in the US Forest Service: Institutional Challenges and Collaborative Opportunites for Improving Planning and Decision-Making in an Era of Climate Change

    Science.gov (United States)

    Wurtzebach, Z.

    2016-12-01

    In 2012, the United States Forest Service promulgated new rules to guide Forest planning efforts in accordance with the National Forest Management Act (NFMA). One important component of the 2012 rule is a requirement for Regionally coordinated cross-boundary "broad scale" monitoring strategies that are designed to inform and facilitate Forest-level adaptive management and planning. This presentation will examine institutional challenges and opportunites for developing effective broad scale monitoring strategies identified in 90 interviews with USFS staff and partner organizations, and collaborative workshops held in Colorado, Wyoming, Arizona, and New Mexico. Internal barriers to development include funding and human resource constraints, organizational culture, problematic incentives and accountability structures, data management issues, and administrative barriers to collaboration. However, we also identify several opportunities for leveraging interagency collaboration, facilitating multi-level coordination, generating efficiencies in data collection and analysis, and improving strategies for reporting and communication to Forest level decision-makers and relevant stakeholders.

  8. Impact of expression of EMP enzymes on glucose metabolism in Zymomonas mobilis.

    Science.gov (United States)

    Chen, Rachel Ruizhen; Agrawal, Manoj; Mao, Zichao

    2013-06-01

    Zymomonas mobilis is the only known microorganism that utilizes the Entner-Doudoroff (ED) pathway anaerobically. In this work, we investigated whether the overexpression of a phosphofructokinase (PFK), the only missing Embden-Meyerhof-Parnas (EMP) pathway enzyme, could establish the pathway in this organism. Introduction of a pyrophosphate-dependent PFK, along with co-expression of homologous fructose-1,6-bisphosphate aldolase and triosephosphate isomerase, did not result in an EMP flux to any appreciable level. However, the metabolism of glucose was impacted significantly. Eight percent of glucose was metabolized to form a new metabolite, dihydroxyacetone. Reducing flux through the ED pathway by as much as 40 % through antisense of a key enzyme, ED aldolase, did not result in a fully functional EMP pathway, suggesting that the ED pathway, especially the lower arm, downstream from glyceraldehyde-3-phosphate, is very rigid, possibly due to redox balance.

  9. EPSON dorimio EMP-TW10H投影机

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    爱普生去年用dorimio品牌第一次发售了dorimio EMP-TW10投影机。具有普及性价格、真实感动的高画质和动人的大画面.加上简单到谁都能使用的理念.因此得到市场的好评。这次爱普生推出了EMP-TW10的升级版EMP-TW10H.在万元级的投影市场上又增加了一个很有竞争力的选手。

  10. Epson高端超便携投影机EMP-740/745

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    Epson高端超便携投影机EMP-740/745是LCD投影机在重量方面的一次跨越,其重量达到了1.7kg(EMP-745重量是1.8kg),成为世界上最轻的LCD投影机之一。而且2500流明的亮度,满足了商务人士对投影机体积和亮度的需求。

  11. Assessment and mitigation of radiation, EMP, debris & shrapnel impacts at megajoule-class laser facilities

    Science.gov (United States)

    Eder, D. C.; Anderson, R. W.; Bailey, D. S.; Bell, P.; Benson, D. J.; Bertozzi, A. L.; Bittle, W.; Bradley, D.; Brown, C. G.; Clancy, T. J.; Chen, H.; Chevalier, J. M.; Combis, P.; Dauffy, L.; Debonnel, C. S.; Eckart, M. J.; Fisher, A. C.; Geille, A.; Glebov, V. Y.; Holder, J.; Jadaud, J. P.; Jones, O.; Kaiser, T. B.; Kalantar, D.; Khater, H.; Kimbrough, J.; Koniges, A. E.; Landen, O. L.; MacGowan, B. J.; Masters, N. D.; MacPhee, A.; Maddox, B. R.; Meyers, M.; Osher, S.; Prasad, R.; Raffestin, D.; Raimbourg, J.; Rekow, V.; Sangster, C.; Song, P.; Stoeckl, C.; Stowell, M. L.; Teran, J. M.; Throop, A.; Tommasini, R.; Vierne, J.; White, D.; Whitman, P.

    2010-08-01

    The generation of neutron/gamma radiation, electromagnetic pulses (EMP), debris and shrapnel at mega-Joule class laser facilities (NIF and LMJ) impacts experiments conducted at these facilities. The complex 3D numerical codes used to assess these impacts range from an established code that required minor modifications (MCNP - calculates neutron and gamma radiation levels in complex geometries), through a code that required significant modifications to treat new phenomena (EMSolve - calculates EMP from electrons escaping from laser targets), to a new code, ALE-AMR, that is being developed through a joint collaboration between LLNL, CEA, and UC (UCSD, UCLA, and LBL) for debris and shrapnel modelling.

  12. The kinetics of antibody binding to Plasmodium falciparum VAR2CSA PfEMP1 antigen and modelling of PfEMP1 antigen packing on the membrane knobs

    DEFF Research Database (Denmark)

    Joergensen, Lars M; Salanti, Ali; Dobrilovic, Tina

    2010-01-01

    ABSTRACT: BACKGROUND: Infected humans make protective antibody responses to the PfEMP1 adhesion antigens exported by Plasmodium falciparum parasites to the erythrocyte membrane, but little is known about the kinetics of this antibody-receptor binding reaction or how the topology of PfEMP1 on the ...

  13. Using the theory of planned behavior to examine pharmacists' intention to utilize a prescription drug monitoring program database.

    Science.gov (United States)

    Fleming, Marc L; Barner, Jamie C; Brown, Carolyn M; Shepherd, Marvin D; Strassels, Scott; Novak, Suzanne

    2014-01-01

    Prescription drug monitoring programs (PDMPs) are state-operated electronic databases that contain patients' controlled drug histories. Most states provide these data to pharmacists via online web portals to combat prescription drug abuse and diversion. The objectives of this study were to: 1) explore the theory of planned behavior's (TPB) utility in predicting Texas pharmacists' intention to utilize an online accessible PDMP; 2) to determine the contribution of each construct, attitude (A), subjective norm (SN) and perceived behavioral control (PBC) in predicting pharmacists' intention; and 3) test whether the addition of perceived obligation (PO) is significantly related to pharmacists' intention. A cross-sectional, 36-item questionnaire was developed from focus groups and literature of pharmacists' views regarding prescription drug abuse. A total of 998 practicing Texas community pharmacists were surveyed to collect data on their intention to utilize a PDMP database. Descriptive statistics, multivariate and hierarchical logistic regression analyses were used to address the study objectives. The response rate was 26.2% (261/998). TPB constructs were significant predictors of pharmacists' high intention to utilize the PDMP. Pharmacists with positive attitudes were almost twice as likely to have high intention (odds ratio [OR] = 1.8, 95% confidence interval [CI] = 1.2-2.8). SN was the strongest predictor of pharmacists' high intention (OR = 2.2, 95% CI = 1.4-3.3). Pharmacists with high PBC were also twice as likely to have high intention (OR = 1.9, 95% CI = 1.2-3.0). Additionally, pharmacists' PO contributed to the prediction of high intention (OR = 1.8, 95% CI = 1.0-3.1) above that explained by the TPB model constructs (X(2) = 4.14, P intention to utilize a PDMP database. Interventions that address pharmacists' A, SN, PBC, and PO may be valuable to increase pharmacists' high intention. Pharmacists' utilization of PDMPs may lead to a decrease in the morbidity and

  14. Parasites causing cerebral falciparum malaria bind multiple endothelial receptors and express EPCR and ICAM-1-binding PfEMP1

    DEFF Research Database (Denmark)

    Tuikue Ndam, Nicaise; Moussiliou, Azizath; Lavstsen, Thomas

    2017-01-01

    Background: Plasmodium falciparum erythrocyte membrane protein 1 (PfEMP1) mediates the binding and accumulation of infected erythrocytes (IE) to blood vessels and tissues. Specific interactions have been described between PfEMP1 and human endothelial proteins CD36, intercellular adhesion molecule-1...

  15. Differences in PfEMP1s recognized by antibodies from patients with uncomplicated or severe malaria

    DEFF Research Database (Denmark)

    Duffy, Michael F; Noviyanti, Rintis; Tsuboi, Takafumi

    2016-01-01

    BACKGROUND: Plasmodium falciparum erythrocyte membrane protein 1 (PfEMP1) variants are encoded by var genes and mediate pathogenic cytoadhesion and antigenic variation in malaria. PfEMP1s can be broadly divided into three principal groups (A, B and C) and they contain conserved arrangements of fu...

  16. Differences in PfEMP1s recognized by antibodies from patients with uncomplicated or severe malaria

    DEFF Research Database (Denmark)

    Duffy, Michael F; Noviyanti, Rintis; Tsuboi, Takafumi;

    2016-01-01

    BACKGROUND: Plasmodium falciparum erythrocyte membrane protein 1 (PfEMP1) variants are encoded by var genes and mediate pathogenic cytoadhesion and antigenic variation in malaria. PfEMP1s can be broadly divided into three principal groups (A, B and C) and they contain conserved arrangements of fu...

  17. 爱普生投影机家族再添生力军EMP-S1H

    Institute of Scientific and Technical Information of China (English)

    王颖

    2004-01-01

    @@ 继市场反馈效果非常好的EMP-S1之后,爱普生公司全新推出其的加强版机型--EMP-S1H.此款新机型不但保留了原有EMP-S1的诸多强项,而且专门针对商务使用时较常出现的问题渗入更完善的技术解决与设计理念,从而打造出功能更强大的实用商务投影机EMP-S1H.不相信么?看看以下问题EMP-S1H是如何解决的吧!

  18. The development of the time dependence of the nuclear EMP electric field

    Energy Technology Data Exchange (ETDEWEB)

    Eng, C

    2009-10-30

    The nuclear electromagnetic pulse (EMP) electric field calculated with the legacy code CHAP is compared with the field given by an integral solution of Maxwell's equations, also known as the Jefimenko equation, to aid our current understanding on the factors that affect the time dependence of the EMP. For a fair comparison the CHAP current density is used as a source in the Jefimenko equation. At first, the comparison is simplified by neglecting the conduction current and replacing the standard atmosphere with a constant density air slab. The simplicity of the resultant current density aids in determining the factors that affect the rise, peak and tail of the EMP electric field versus time. The three dimensional nature of the radiating source, i.e. sources off the line-of-sight, and the time dependence of the derivative of the current density with respect to time are found to play significant roles in shaping the EMP electric field time dependence. These results are found to hold even when the conduction current and the standard atmosphere are properly accounted for. Comparison of the CHAP electric field with the Jefimenko electric field offers a direct validation of the high-frequency/outgoing wave approximation.

  19. Gel shift analysis of the empA promoter region in Vibrio anguillarum

    Directory of Open Access Journals (Sweden)

    Denkin Steven M

    2004-10-01

    Full Text Available Abstract Background The induction of metalloprotease encoded by empA in Vibrio anguillarum occurs at high cell density in salmon intestinal mucus. Previously we have shown that there are significant differences in empA expression in two strains of V. anguillarum, M93Sm and NB10. It is hypothesized that differences in empA regulation are due to differences in binding of regulatory elements. Results Two strains of V. anguillarum, M93Sm and NB10, were examined and compared for the presence of DNA regulatory proteins that bind to and control the empA promoter region. Gel mobility shift assays, using a digoxigenin (DIG-labeled oligomer containing a lux box-like element and the promoter for empA, were done to demonstrate the presence of a DNA-binding protein. Protein extracts from NB10 cells incubated in Luria Bertani broth + 2% NaCl (LB20, nine salts solution + 200 μg/ml mucus (NSSM, 3M (marine minimal medium, or NSS resulted in a gel mobility shift. No gel mobility shift was seen when protein extracts from either LB20- or NSSM-grown M93Sm cells were mixed with the DIG-labeled empA oligomer. The azocasein assay detected protease activity in all incubation conditions for NB10 culture supernatants. In contrast, protease activity was detected in M93Sm culture supernatants only when incubated in NSSM. Since the luxR homologue in V. anguillarum, vanT, has been cloned, sequenced, and shown to be required for protease activity, we wanted to determine if vanT mutants of NB10 exhibit the same gel shift observed in the wild-type. Site-directed mutagenesis was used to create vanT mutants in V. anguillarum M93Sm and NB10 to test whether VanT is involved with the gel mobility shift. Both vanT mutants, M02 and NB02, did not produce protease activity in any conditions. However, protein extracts from NB02 incubated in each condition still exhibited a gel shift when mixed with the DIG-labeled empA oligomer. Conclusions The data demonstrate that protein extracts of V

  20. Saltwater intrusion in the surficial aquifer system of the Big Cypress Basin, southwest Florida, and a proposed plan for improved salinity monitoring

    Science.gov (United States)

    Prinos, Scott T.

    2013-01-01

    The installation of drainage canals, poorly cased wells, and water-supply withdrawals have led to saltwater intrusion in the primary water-use aquifers in southwest Florida. Increasing population and water use have exacerbated this problem. Installation of water-control structures, well-plugging projects, and regulation of water use have slowed saltwater intrusion, but the chloride concentration of samples from some of the monitoring wells in this area indicates that saltwater intrusion continues to occur. In addition, rising sea level could increase the rate and extent of saltwater intrusion. The existing saltwater intrusion monitoring network was examined and found to lack the necessary organization, spatial distribution, and design to properly evaluate saltwater intrusion. The most recent hydrogeologic framework of southwest Florida indicates that some wells may be open to multiple aquifers or have an incorrect aquifer designation. Some of the sampling methods being used could result in poor-quality data. Some older wells are badly corroded, obstructed, or damaged and may not yield useable samples. Saltwater in some of the canals is in close proximity to coastal well fields. In some instances, saltwater occasionally occurs upstream from coastal salinity control structures. These factors lead to an incomplete understanding of the extent and threat of saltwater intrusion in southwest Florida. A proposed plan to improve the saltwater intrusion monitoring network in the South Florida Water Management District’s Big Cypress Basin describes improvements in (1) network management, (2) quality assurance, (3) documentation, (4) training, and (5) data accessibility. The plan describes improvements to hydrostratigraphic and geospatial network coverage that can be accomplished using additional monitoring, surface geophysical surveys, and borehole geophysical logging. Sampling methods and improvements to monitoring well design are described in detail. Geochemical analyses

  1. Environmental monitoring techniques and wave energy potential assessment: an integrated approach for planning marine energy conversion schemes in the northern Tyrrhenian sea, Italy

    Science.gov (United States)

    Scanu, Sergio; Peviani, Maximo; Carli, Filippo Maria; Paladini de Mendoza, Francesco; Piermattei, Viviana; Bonamano, Simone; Marcelli, Marco

    2015-04-01

    This work proposes a multidisciplinary approach in which wave power potential maps are used as baseline for the application of environmental monitoring techniques identified through the use of a Database for Environmental Monitoring Techniques and Equipment (DEMTE), derived in the frame of the project "Marine Renewables Infrastructure Network for Emerging Energy Technologies" (Marinet - FP7). This approach aims to standardize the monitoring of the marine environment in the event of installation, operation and decommissioning of Marine Energy Conversion Systems. The database has been obtained through the collection of techniques and instrumentation available among the partners of the consortium, in relation with all environmental marine compounds potentially affected by any impacts. Furthermore in order to plan marine energy conversion schemes, the wave potential was assessed at regional and local scales using the numerical modelling downscaling methodology. The regional scale lead to the elaboration of the Italian Wave Power Atlas, while the local scale lead to the definition of nearshore hot spots useful for the planning of devices installation along the Latium coast. The present work focus in the application of environmental monitoring techniques identified in the DEMTE, in correspondence of the hotspot derived from the wave potential maps with particular reference to the biological interaction of the devices and the management of the marine space. The obtained results are the bases for the development of standardized procedures which aims to an effective application of marine environmental monitoring techniques during the installation, operation and decommissioning of Marine Energy Conversion Systems. The present work gives a consistent contribution to overcome non-technological barriers in the concession procedures, as far as the protection of the marine environment is of concern.

  2. Ocean climate indicators: A monitoring inventory and plan for tracking climate change in the north-central California coast and ocean region

    Science.gov (United States)

    Duncan, Benet; Higgason, Kelley; Suchanek, Tom; Largier, John; Stachowicz, Jay; Allen, Sarah; Bograd, Steven; Breen, R.; Gellerman, Holly; Hill, Tessa; Jahncke, Jaime; Johnosn, Rebecca; Lonhart, Steve I.; Morgan, Steven; Wilkerson, Frances; Roletto, Jan

    2013-01-01

    The impacts of climate change, defined as increasing atmospheric and oceanic carbon dioxide and associated increases in average global temperature and oceanic acidity, have been observed both globally and on regional scales, such as in the North-central California coast and ocean, a region that extends from Point Arena to Point Año Nuevo and includes the Pacific coastline of the San Francisco Bay Area. Because of the high economic and ecological value of the region’s marine environment, the Gulf of the Farallones National Marine Sanctuary (GFNMS) and other agencies and organizations have recognized the need to evaluate and plan for climate change impacts. Climate change indicators can be developed on global, regional, and site-specific spatial scales, and they provide information about the presence and potential impacts of climate change. While indicators exist for the nation and for the state of California as a whole, no system of ocean climate indicators exist that specifically consider the unique characteristics of the California coast and ocean region. To that end, GFNMS collaborated with over 50 regional, federal, and state natural resource managers, research scientists, and other partners to develop a set of 2 ocean climate indicators specific to this region. A smaller working group of 13 regional partners developed monitoring goals, objectives, strategies, and activities for the indicators and recommended selected species for biological indicators, resulting in the Ocean Climate Indicators Monitoring Inventory and Plan. The working group considered current knowledge of ongoing monitoring, feasibility of monitoring, costs, and logistics in selecting monitoring activities and selected species.

  3. EMP径向滑动轴承热弹流分析与仿真%Thermo-elasto-hydrodynamic Analysis and Simulation of EMP Journal Bearing

    Institute of Scientific and Technical Information of China (English)

    2000-01-01

    Elastic metal plastic (EMP) journal bearing is a kind of original bearing. Because of the specialty of the composite materials, elastic and thermal deformations of the EMP bush are much larger than that of common metal bush. In this paper, the three-dimensional mathematical model is established to analyze thermo-elasto-hydrodynamics (TEHD) of EMP. The numerical TEHD analysis software is programmed. An example is given to prove the lubrication performance of EMP.

  4. National Wildlife Refuge System Inventory and Monitoring Program organization and administration (business guidelines) : An addendum to the Strategic Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This addendum to the Strategic Plan summarizes the organizational framework of the national I the roles and responsibilities of the national I and the implementation...

  5. Mapping the transcription start points of the Staphylococcus aureus eap, emp, and vwb promoters reveals a conserved octanucleotide sequence that is essential for expression of these genes.

    Science.gov (United States)

    Harraghy, Niamh; Homerova, Dagmar; Herrmann, Mathias; Kormanec, Jan

    2008-01-01

    Mapping the transcription start points of the eap, emp, and vwb promoters revealed a conserved octanucleotide sequence (COS). Deleting this sequence abolished the expression of eap, emp, and vwb. However, electrophoretic mobility shift assays gave no evidence that this sequence was a binding site for SarA or SaeR, known regulators of eap and emp.

  6. Test plan :

    Energy Technology Data Exchange (ETDEWEB)

    Dwyer, Stephen F.

    2013-05-01

    This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

  7. [2015 survey overview and future plans : Investigating Long-Term Monitoring Protocols in support of Quivira NWR Habitat Objectives

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report is an overview of 2015 surveying for the Investigating Long-Term Monitoring Protocols in support of Quivira NWR Habitat Objectives project led by Fort...

  8. Path planning of UAV in water environmental monitoring%无人机在水环境监测中的航迹规划

    Institute of Scientific and Technical Information of China (English)

    孟庆志; 李平

    2012-01-01

    无人机在水环境监测中,受其物理性能和风险因素影响无法一次性的对所有区域进行监测,充分发挥无人机的使用效率变得极为重要.提出了无人机在水环境监测中的最优航迹规划问题,建立了该问题的数学模型,在此基础上提出了一种基于遗传-模拟退火优化算法,采用网格空间表示与方向编码相结合的方法减小了计算量.仿真实验结果表明:该方法能够得到比遗传算法更优的解,可以有效解决无人机在水环境监测中的航迹规划问题.%In water environmental monitoring, unmanned aerial vehicle ( UAV ) can not monitor all the areas at a time due to the influence of its physical properties and risk factor. So it' s extremely important to bring the service efficiency of the UAV into full play. The optimal path planning problem of the UAV for water environmental monitoring is presented and a mathematic model of the problem is built up. On the basis of this, a genetic-simulation annealing algorithm is presented. The computational amount is decreased, a method combined of both grid space indication and directional code is adopted. The simulation test result indicates that this method can get a better solution than genetic algorithm and it can resolve the path planning problem of the UAV for water environmental monitoring effectively.

  9. Analysis of gene expression profile induced by EMP-1 in esophageal cancer cells using cDNA Microarray

    Institute of Scientific and Technical Information of China (English)

    Hai-Tao Wang; Jian-Ping Kong; Fang Ding; Xiu-Qin Wang; Ming-Rong Wang; Lian-Xin Liu; Min Wu; Zhi-Hua Liu

    2003-01-01

    AIM: To obtain human esophageal cancer cell EC9706 stably expressed epithelial membrane protein-1 (EMP-1) with integrated eukaryotic plasmid harboring the open reading frame (ORF) of human EMP-1, and then to study the mechanism by which EMP-1 exerts its diverse cellular action on cell proliferation and altered gene profile by exploring the effect of EMP-1.METHODS: The authors first constructed pcDNA3.1/mychis expression vector harboring the ORF of EMP-1 and then transfected it into human esophageal carcinoma cell line EC9706. The positive clones were analyzed by Western blot and RT-PCR. Moreover, the cell growth curve was observed and the cell cycle was checked by FACS technique. Using cDNA microarray technology, the authors compared the gene expression pattern in positive clones with control. To confirm the gene expression profile, semi-quantitative RT-PCR was carried out for 4 of the randomly picked differentially expressed genes. For those differentially expressed genes,classification was performed according to their function and cellular component.RESULTS: Human EMP-1 gene can be stably expressed in ECg706 cell line transfected with human EMP-1. The authors found the cell growth decreased, among which S phase was arrested and G1 phase was prolonged in the transfected positive clones. By cDNA microarray analysis, 35 genes showed an over 2.0 fold change in expression level after transfection, with 28 genes being consistently up-regulated and 7 genes being down-regulated. Among the classified genes, almost half of the induced genes (13 out of 28 genes) were related to cell signaling, cell communication and particularly to adhesion.CONCLUSION: Overexpression of human EMP-1 gene can inhibit the proliferation of EC9706 cell with S phase arrested and G1 phase prolonged. The cDNA microarray analysis suggested that EMP-1 may be one of regulators involved incell signaling, cell communication and adhesion regulators.

  10. The hypothesis of wealth maximization for stockholders during mergers and acquisitions - an empirical analysis of Brazilian stocks after the real plan Análise empírica da hipótese de maximização da riqueza dos acionistas nos processos de fusão e aquisição ocorridos no mercado de capitais brasileiro pós-plano real

    Directory of Open Access Journals (Sweden)

    Marcos Antônio de Camargos

    2005-12-01

    Full Text Available The concept of creating wealth for stockholders through stock price increases usually accompanies a merger or acquisition. This ongoing appeal continues to be defended by those demonstrating such price increases and is contested by adversaries. Analyses were made of the market reaction and return of open companies on the Brazilian stock exchange, BOVESPA, after mergers and acquisitions between July 1994 and July 2002 based upon abnormal returns close to the press releases. The method used was the Event-Study and statistical treatment made use of the One-Way ANOVA and T test (One-Sample Test. Mergers and acquisitions analyzed had no statistically significant impact on the price of the stocks although there was a tendency for abnormal returns to recede after press releases, so that no real gains resulted, contrary to this hypothesis of wealth maximization.A lógica subjacente a um processo de fusão ou aquisição geralmente é a potencial criação de riqueza para os acionistas na forma de valorização acionária. Trata-se de um tema recorrente, ainda permeado por embates de estudiosos que defendem ou encontraram evidências empíricas de valorização das ações, contra os que a contestam. O artigo avaliou a reação do mercado e a rentabilidade de ações de companhias adquirentes de capital aberto brasileiras que passaram por processos de fusão ou aquisição no âmbito do mercado da BOVESPA, entre julho de 1994 e julho de 2002, por meio da análise de retornos anormais em períodos próximos a cada anúncio. A metodologia utilizada foi um Estudo de Evento. No tratamento estatístico foram utilizados os testes One-Way ANOVA e o Teste T para uma amostra (One-Sample Test. Concluiu-se que os processos de fusão ou aquisição estudados não causaram impactos significativos estatisticamente no preço das ações, apesar da tendência de queda da média dos retornos anormais após a divulgação do evento, e que esses processos não resultaram

  11. A influência da idade e da escolaridade sobre a experiência empática de adultos

    OpenAIRE

    Vanessa Dordron de Pinho; Conceição Santos Fernandes; Eliane Mary de Oliveira Falcone

    2011-01-01

    Atualmente, os teóricos começam a compartilhar uma visão da experiência empática humana como um fenômeno multidimensional influenciado por diversos aspectos, dentre eles, a idade e a escolaridade. No presente estudo, investigou-se as relações entre a habilidade social empática e essas duas variáveis sociodemográficas, em 537 participantes adultos. A habilidade empática foi estudada em quatro dimensões, que correspondem aos quatro fatores que compõem o instrumento utilizado, o Inventário de Em...

  12. Indoor weather related to the energy consumption of air conditioned classroom: Monitoring system for energy efficient building plan

    Science.gov (United States)

    Rattanongphisat, W.; Suwannakom, A.; Harfield, A.

    2016-08-01

    The current research aims to investigate the relation of indoor weather to energy consumption of air conditioned classroom by design and construct the indoor weather and energy monitoring systems. In this research, a combined temperature and humidity sensor in conjunction with a microcontroller was constructed for the indoor weather monitoring system. The wire sensor network for the temperature-humidity sensor nodes is the Controller Area Network (CAN). Another part is using a nonintrusive method where a wireless current transformer sending the signal to the data collection box then transmitted by the radio frequency to the computer where the Ethernet application software was installed for the energy monitoring system. The results show that the setting air temperature, outdoor ambient temperature and operating time impact to the energy consumption of the air conditioned classroom.

  13. The 1993 baseline biological studies and proposed monitoring plan for the Device Assembly Facility at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    Woodward, B.D.; Hunter, R.B.; Greger, P.D.; Saethre, M.B.

    1995-02-01

    This report contains baseline data and recommendations for future monitoring of plants and animals near the new Device Assembly Facility (DAF) on the Nevada Test Site (NTS). The facility is a large structure designed for safely assembling nuclear weapons. Baseline data was collected in 1993, prior to the scheduled beginning of DAF operations in early 1995. Studies were not performed prior to construction and part of the task of monitoring operational effects will be to distinguish those effects from the extensive disturbance effects resulting from construction. Baseline information on species abundances and distributions was collected on ephemeral and perennial plants, mammals, reptiles, and birds in the desert ecosystems within three kilometers (km) of the DAF. Particular attention was paid to effects of selected disturbances, such as the paved road, sewage pond, and the flood-control dike, associated with the facility. Radiological monitoring of areas surrounding the DAF is not included in this report.

  14. The Virtual Maintenance System: A Computer-Based Support Tool for Robust Design, Product Monitoring, Fault Diagnosis and Maintenance Planning

    NARCIS (Netherlands)

    Houten, van F.J.A.M.; Kimura, F.

    2000-01-01

    Digital (geometric) product models can be used for maintainability analysis and maintenance planning. It is not feasible to build digital product models for maintenance purposes only, but if a digital product model is available, it may be used to support many maintenance-related engineering tasks. E

  15. The virtual maintenance system: a computer-based support tool for robust design, product monitoring, fault diagnosis and maintenance planning

    NARCIS (Netherlands)

    van Houten, Frederikus J.A.M.; Kimura, F.

    2000-01-01

    Digital (geometric) product models can be used for maintainability analysis and maintenance planning. It is not feasible to build digital product models for maintenance purposes only, but if a digital product model is available, it may be used to support many maintenance-related engineering tasks.

  16. 40 CFR 63.8575 - What do I need to know about operation, maintenance, and monitoring plans?

    Science.gov (United States)

    2010-07-01

    ... SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Clay Ceramics... unit such that the measurement is representative of control of the exhaust emissions (e.g., on or... quality assurance procedures consistent with the requirements in § 63.8(d). (10) Continuous monitoring...

  17. Planning and Computerised Monitoring of an Experiment of Thermal Analysis of the Alloys in the Al-Cu-Si System

    Directory of Open Access Journals (Sweden)

    Florentina Cziple

    2007-10-01

    Full Text Available The paper presents an installation conceived for the automatic registration of the temperature in the thermal analysis, at the industrial and laboratory level, with application to the system of non-ferrous alloys Al-Cu-Si. The experiment performed on the above installation is compared to processes monitored through simulation with specialised software.

  18. Minimizing the Effects of Electromagnetic Pulse (EMP) on Field Medical Equipment

    Science.gov (United States)

    1991-06-07

    Keep wiring short . Unplug unused equipment, Run power cabling and tents in a magnetic North-South direction. Avoid running power cabling in the East...electromagnetic pulse (EMP) is a radiated electromagnetic (EM) wave caused by the detonation of a nuclear weapcn above the earth’s atmosphere. A one megaton...Analyzer Endoscopic Light Source Ophthalmic Diathermy Flame Photometer These wudies demons rated that selected items of otherwise unprotected medical

  19. Electromagnetic pulse (EMP) survey of the FEMA Region X Federal Regional Center, Bothell, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Crutcher, R.I.; Buchanan, M.E.; Jones, R.W.

    1991-11-01

    The purpose of this report is to develop an engineering design package to protect the Federal Emergency Management Agency (FEMA) National Radio System (FNARS) facilities against the effects of high-altitude electromagnetic pulses (HEMPS). This report refers to the FEMA Federal Regional Center (FRC) in Bothell, Washington. It is highly probably that there will be a heavy dependence upon high-frequency (hf) radio communications for long-haul communications following a nuclear attack on the continental United States, should one occur. To maintain the viability of the FEMA hf radio network during such a situation, the FNARS facilities must take measures to protect against the effects of HEMP that are likely to be created in a nuclear confrontation. The equipment under stress has already been designed and built so that little opportunity exists for equipment design changes that could raise the threshold levels at which malfunctions occur. The solution must then be to reduce HEMP-induced stresses on the system by means of tailored retrofit hardening measures using commercial protection devices when available. If is the intent of this report to define the particular hardening measures that will minimize the susceptibility of the network components to HEMP effects. To the extent economically viable, protective actions have been recommended for implementation, along with necessary changes or additions, during the period of the FNARS upgrade program. This report addresses electromagnetic pulse (EMP) effects only, and disregards any condition in which radiation effects may be a factor. This report identifies the systems in the facility considered critical for emergency option. To identify the critical systems in the facility and the EMP coupling paths into these systems, an EMP survey of the facility was conducted. Results of the survey are presented along with recommendations for tailored retrofit hardening measures to be implemented to protect the facility from EMP.

  20. The Use of Explosion Aftershock Probabilities for Planning and Deployment of Seismic Aftershock Monitoring System for an On-site Inspection

    Science.gov (United States)

    Labak, P.; Ford, S. R.; Sweeney, J. J.; Smith, A. T.; Spivak, A.

    2011-12-01

    One of four elements of CTBT verification regime is On-site inspection (OSI). Since the sole purpose of an OSI shall be to clarify whether a nuclear weapon test explosion or any other nuclear explosion has been carried out, inspection activities can be conducted and techniques used in order to collect facts to support findings provided in inspection reports. Passive seismological monitoring, realized by the seismic aftershock monitoring (SAMS) is one of the treaty allowed techniques during an OSI. Effective planning and deployment of SAMS during the early stages of an OSI is required due to the nature of possible events recorded and due to the treaty related constrains on size of inspection area, size of inspection team and length of an inspection. A method, which may help in planning the SAMS deployment is presented. An estimate of aftershock activity due to a theoretical underground nuclear explosion is produced using a simple aftershock rate model (Ford and Walter, 2010). The model is developed with data from the Nevada Test Site and Semipalatinsk Test Site, which we take to represent soft- and hard-rock testing environments, respectively. Estimates of expected magnitude and number of aftershocks are calculated using the models for different testing and inspection scenarios. These estimates can help to plan the SAMS deployment for an OSI by giving a probabilistic assessment of potential aftershocks in the Inspection Area (IA). The aftershock assessment combined with an estimate of the background seismicity in the IA and an empirically-derived map of threshold magnitude for the SAMS network could aid the OSI team in reporting. We tested the hard-rock model to a scenario similar to the 2008 Integrated Field Exercise 2008 deployment in Kazakhstan and produce an estimate of possible recorded aftershock activity.

  1. Exploring the SDSS Data Set with Linked Scatter Plots. I. EMP, CEMP, and CV Stars

    Science.gov (United States)

    Carbon, Duane F.; Henze, Christopher; Nelson, Bron C.

    2017-02-01

    We present the results of a search for extremely metal-poor (EMP), carbon-enhanced metal-poor (CEMP), and cataclysmic variable (CV) stars using a new exploration tool based on linked scatter plots (LSPs). Our approach is especially designed to work with very large spectrum data sets such as the SDSS, LAMOST, RAVE, and Gaia data sets, and it can be applied to stellar, galaxy, and quasar spectra. As a demonstration, we conduct our search using the SDSS DR10 data set. We first created a 3326-dimensional phase space containing nearly 2 billion measures of the strengths of over 1600 spectral features in 569,738 SDSS stars. These measures capture essentially all the stellar atomic and molecular species visible at the resolution of SDSS spectra. We show how LSPs can be used to quickly isolate and examine interesting portions of this phase space. To illustrate, we use LSPs coupled with cuts in selected portions of phase space to extract EMP stars, CEMP stars, and CV stars. We present identifications for 59 previously unrecognized candidate EMP stars and 11 previously unrecognized candidate CEMP stars. We also call attention to 2 candidate He ii emission CV stars found by the LSP approach that have not yet been discussed in the literature.

  2. X-Shooter GTO: Chemical analysis of a sample of EMP candidates

    CERN Document Server

    Caffau, E; François, P; Spite, M; Spite, F; Zaggia, S; Ludwig, H -G; Monaco, L; Sbordone, L; Cayrel, R; Hammer, F; Randich, S; Hill, V; Molaro, P

    2011-01-01

    Context: Extremely metal-poor stars (EMP) are very rare objects that hold in their atmospheres the fossil record of the chemical composition of the early phases of Galactic evolution. Finding these objects and determining their chemical composition provides important constraints on these early phases. Aims: Using a carefully designed selection method, we chose a sample of candidate EMP stars from the low resolution spectra of the Sloan Digital Sky Survey and observed them with X-Shooter at the VLT to confirm their metallicities and determine abundances for as many elements as possible. Method: The X-Shooter spectra are analysed by means of one-dimensional, plane-parallel, hydrostatic model atmospheres. Corrections for the granulation effects are computed using CO5BOLD hydrodynamical simulations. Results: All the candidates are confirmed to be EMP stars, proving the efficiency of our selection method within about 0.5 dex. The chemical composition of this sample is compatible with those of brighter samples, sug...

  3. Role of Off-Line-of-Sight Propagation in Geomagnetic EMP Formation

    Energy Technology Data Exchange (ETDEWEB)

    Kruger, Hans W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-05-23

    The author’s synchrotron radiation based 3D geomagnetic EMP code MACSYNC has been used to explore the impact on pulse rise time and air conductivity of EMP propagation paths to the observer that are located off the direct line-of-sight (LOS) between gamma source and observer. This geometry is always present because, for an isotropic source, most the gammas are emitted at an angle with respect to the LOS. Computations for a 1 kt near-surface burst observed from space yield two principal findings: 1. The rise time is generated by the combined actions of a) electron spreading along the LOS due to the Compton electron emission angular distribution folded with electron multiple scattering effects, and b) radiation arrival time spreading due to length differences for different off-LOS propagation paths. The pulse rise time does not depend on the rise time of the conductivity. The conductivity rise time determines the pulse amplitude. 2. One-dimensional legacy EMP codes are inherently incapable of producing the correct pulse shape because they cannot treat the dependence of the conductivity on two dimensions, i.e. the radius from the source and the angle of the propagation path with the LOS. This divergence from one-dimensionality begins at a small fraction of a nanosecond for a sea-level burst. This effect will also be present in high-altitude bursts, however, determination of its onset time and magnitude requires high-altitude computations which have not yet been done.

  4. EMP-induced alterations of tight junction protein expression and disruption of the blood-brain barrier.

    Science.gov (United States)

    Ding, Gui-Rong; Qiu, Lian-Bo; Wang, Xiao-Wu; Li, Kang-Chu; Zhou, Yong-Chun; Zhou, Yan; Zhang, Jie; Zhou, Jia-Xing; Li, Yu-Rong; Guo, Guo-Zhen

    2010-07-15

    The blood-brain barrier (BBB) is critical to maintain cerebral homeostasis. In this study, we examined the effects of exposure to electromagnetic pulse (EMP) on the functional integrity of BBB and, on the localization and expression of tight junction (TJ) proteins (occludin and ZO-1) in rats. Animals were sham or whole-body exposed to EMP at 200 kV/m for 400 pulses. The permeability of BBB in rat cerebral cortex was examined by using Evans Blue (EB) and lanthanum nitrate as vascular tracers. The localization and expression of TJ proteins were assessed by western blot and immunofluorescence analysis, respectively. The data indicated that EMP exposure caused: (i) increased permeability of BBB, and (ii) altered localization as well as decreased levels of TJ protein ZO-1. These results suggested that the alteration of ZO-1 may play an important role in the disruption of tight junctions, which may lead to dysfunction of BBB after EMP exposure.

  5. Analysis of COPII Vesicles Indicates a Role for the Emp47-Ssp120 Complex in Transport of Cell Surface Glycoproteins.

    Science.gov (United States)

    Margulis, Neil G; Wilson, Joshua D; Bentivoglio, Christine M; Dhungel, Nripesh; Gitler, Aaron D; Barlowe, Charles

    2016-03-01

    Coat protein complex II (COPII) vesicle formation at the endoplasmic reticulum (ER) transports nascent secretory proteins forward to the Golgi complex. To further define the machinery that packages secretory cargo and targets vesicles to Golgi membranes, we performed a comprehensive proteomic analysis of purified COPII vesicles. In addition to previously known proteins, we identified new vesicle proteins including Coy1, Sly41 and Ssp120, which were efficiently packaged into COPII vesicles for trafficking between the ER and Golgi compartments. Further characterization of the putative calcium-binding Ssp120 protein revealed a tight association with Emp47 and in emp47Δ cells Ssp120 was mislocalized and secreted. Genetic analyses demonstrated that EMP47 and SSP120 display identical synthetic positive interactions with IRE1 and synthetic negative interactions with genes involved in cell wall assembly. Our findings support a model in which the Emp47-Ssp120 complex functions in transport of plasma membrane glycoproteins through the early secretory pathway.

  6. Plasmodium falciparum-infected erythrocyte knob density is linked to the PfEMP1 variant expressed

    DEFF Research Database (Denmark)

    Subramani, Ramesh; Quadt, Katharina; Jeppesen, Anine Engholm

    2015-01-01

    regardless of the PfEMP1 expressed. Our study documents for the first time that knob density is related to the PfEMP1 variant expressed. This may reflect topological requirements to ensure optimal adhesive properties of the IEs. IMPORTANCE: Infections with Plasmodium falciparum malaria parasites are still...... responsible for many deaths, especially among children and pregnant women. New interventions are needed to reduce severe illness and deaths caused by this malaria parasite. Thus, a better understanding of the mechanisms behind the pathogenesis is essential. A main reason why Plasmodium falciparum malaria......UNLABELLED: Members of the clonally variant Plasmodium falciparum erythrocyte membrane protein 1 (PfEMP1) family mediate adhesion of infected erythrocytes (IEs) to vascular receptors. PfEMP1 expression is normally confined to nanoscale knob protrusions on the IE surface membrane. To investigate...

  7. Plasmodium falciparum-Infected Erythrocyte Knob Density Is Linked to the PfEMP1 Variant Expressed

    DEFF Research Database (Denmark)

    Subramani, Ramesh; Quadt, Katharina; Jeppesen, Anine Engholm;

    2015-01-01

    UNLABELLED: Members of the clonally variant Plasmodium falciparum erythrocyte membrane protein 1 (PfEMP1) family mediate adhesion of infected erythrocytes (IEs) to vascular receptors. PfEMP1 expression is normally confined to nanoscale knob protrusions on the IE surface membrane. To investigate...... regardless of the PfEMP1 expressed. Our study documents for the first time that knob density is related to the PfEMP1 variant expressed. This may reflect topological requirements to ensure optimal adhesive properties of the IEs. IMPORTANCE: Infections with Plasmodium falciparum malaria parasites are still...... responsible for many deaths, especially among children and pregnant women. New interventions are needed to reduce severe illness and deaths caused by this malaria parasite. Thus, a better understanding of the mechanisms behind the pathogenesis is essential. A main reason why Plasmodium falciparum malaria...

  8. A method for visualizing surface-exposed and internal PfEMP1 adhesion antigens in Plasmodium falciparum infected erythrocytes

    DEFF Research Database (Denmark)

    Bengtsson, Dominique; Sowa, Kordai M; Salanti, Ali;

    2008-01-01

    BACKGROUND: The insertion of parasite antigens into the host erythrocyte membrane and the structure and distribution of Plasmodium falciparum adhesion receptors on that membrane are poorly understood. Laser scanning confocal microscopy (LSCM) and a novel labelling and fixation method have been used...... to obtain high resolution immuno-fluorescent images of erythrocyte surface PfEMP1 and internal antigens which allow analysis of the accumulation of PfEMP1 on the erythrocyte membrane during asexual development. METHODS: A novel staining technique has been developed which permits distinction between...... erythrocyte surface PfEMP1 and intracellular PfEMP1, in parasites whose nuclear material is exceptionally well resolved. Primary antibody detection by fluorescence is carried out on the live parasitized erythrocyte. The surface labelled cells are then fixed using paraformaldehyde and permeabilized with a non...

  9. Analysis Methods for Extracting Knowledge from Large-Scale WiFi Monitoring to Inform Building Facility Planning

    DEFF Research Database (Denmark)

    Ruiz-Ruiz, Antonio; Blunck, Henrik; Prentow, Thor Siiger

    2014-01-01

    realistic data to inform facility planning. In this paper, we propose analysis methods to extract knowledge from large sets of network collected WiFi traces to better inform facility management and planning in large building complexes. The analysis methods, which build on a rich set of temporal and spatial...... features, include methods for noise removal, e.g., labeling of beyond building-perimeter devices, and methods for quantification of area densities and flows, e.g., building enter and exit events, and for classifying the behavior of people, e.g., into user roles such as visitor, hospitalized or employee...... noise removal of beyond building perimeter devices. We furthermore present detailed statistics from our analysis regarding people’s presence, movement and roles, and example types of visualizations that both highlight their potential as inspection tools for planners and provide interesting insights...

  10. Differential diagnosis of acute rejection and chronic cyclosporine nephropathy after rat renal transplantation by detection of endothelial microparticles (EMP).

    Science.gov (United States)

    Cui, Jiewei; Yang, Jing; Cao, Weike; Sun, Yi

    2010-12-01

    Endothelial microparticles (EMP) are small vesicles smaller than 1.0μm, released from endothelial cells (EC) during their activation and (or) apoptosis. The assay of the level of elevated EMP is a new approach to evaluate the dysfunction of endothelial cell. EMP can be classified into several types according to their membrane molecular, and the levels of various types of EMP may be different. As the most cost-effective immunodepressant, cyclosporine A (CsA) has been used widely in organ transplantation. But its dose is hard to control, under-medication may cause the acute rejection (AR) and overdose may cause chronic cyclosporine nephropathy (CCN). The cyclosporine A (CsA) caused CCN and the AR caused renal injury after renal transplantation are both vascular diseases related with endothelial dysfunction, and up to now, there is still no effective method to distinguish the two kinds of diseases. Owing to distinct pathogenesis of the two kinds of vascular diseases, the level of each type of EMP originated from vascular endothelial cells may be different. We hypothesize that maybe we can distinguish them by detecting the different levels of some types of EMP which is also related with vascular disease, and we propose to prove our hypothesis through animal experiment. If our hypothesis is proved, it will be more helpful for clinicians to adjust the dose of CsA promptly according to the differential diagnosis of the two kinds of diseases.

  11. Restrain of bone growth by estrogen-mimetic peptide-1 (EMP-1): a micro-computed tomographic study.

    Science.gov (United States)

    Kasher, Roni; Bajayo, Alon; Gabet, Yankel; Nevo, Nava; Fridkin, Mati; Katchalski-Katzir, Ephraim; Kohen, Fortune; Bab, Itai

    2009-06-01

    Estrogen has a key role in the regulation of skeletal growth and maintenance of bone mass. Recently, we developed peptides having estrogen-like activity as potential estrogen-based new drugs. The aim of the present study was to evaluate the influence of long-term administration of the most efficacious of these peptides, the hexapeptide EMP-1 (VSWFFE), on bone mass and development. EMP-1 was injected daily to ovariectomized (OVX) and intact young, sexually mature female mice for 10 weeks. Whole femora, including the cartilaginous growth plates were analyzed by micro-computed tomography (microCT). We found that peptide EMP-1 restrains bone growth in OVX mice: it inhibited dramatically bone longitudinal growth (40%), and decreased femoral diaphyseal diameter. Peptide EMP-1 had no effect on bone growth in normal mice, and did not influence the OVX-induced bone loss. We then developed a new microCT methodology to evaluate uncalcified and calcified growth plate parameters. In the OVX mice, peptide EMP-1 reduced volume and thickness of the uncalcified growth plate, a possible cause for the inhibition of bone longitudinal growth. Peptide EMP-1 may be used as a lead compound for the development of drugs to treat acromegalic patients.

  12. Planning the improvement of a seismic network for monitoring active volcanic areas: the experience on Mt. Etna

    Science.gov (United States)

    D'Alessandro, A.; Scarfì, L.; Scaltrito, A.; Di Prima, S.; Rapisarda, S.

    2013-10-01

    Seismology and geodesy are generally seen as the most reliable diagnostic tools for monitoring highly active or erupting volcanoes, like Mt. Etna. From the early 1980's, seismic activity was monitored at Mt. Etna by a permanent seismic network, progressively improved in the following years. This network has been considerably enhanced since 2005 by 24-bit digital stations equipped with broad-band (40 s) sensors. Today, thanks to a configuration of 33 broad-band and 12 short-period stations, we have a good coverage of the volcanic area as well as a high quality of the collected data. In the framework of the VULCAMED project a workgroup of Istituto Nazionale di Geofisica e Vulcanologia has taken on the task of developing the seismic monitoring system, through the installation of other seismic stations. The choice of optimal sites must be clearly made through a careful analysis of the geometry of the existing seismic network. In this paper, we applied the Seismic Network Evaluation through Simulation in order to evaluate the performance of the Etna Seismic Network before and after the addition of the stations in the candidate sites. The main advantage of the adopted method is that we can evaluate the improvement of the network before the actual installation of the stations. Our analysis has permitted to identify some critical issues of the current permanent seismic network related to the lack of stations in the southern sector of the volcano, which is nevertheless affected by a number of seismogenic structures. We have showed that the addition of stations at the candidate sites would greatly extend the coverage of the network to the south by significantly reducing the errors in the hypocenter parameters estimation.

  13. Non-Invasive Monitoring of Breast Tumor Oxygenation: A Key to Tumor Therapy Planning and Tumor Prognosis

    Science.gov (United States)

    2004-09-01

    of the (1986). newborn infants as a function of inter optode spacing," Adv. Exp. 24. H. Liu, A. H. Hielscher , F. K. Tittel, S. L. Jacques, and B...infrared monitoring of human skeletal muscle oxygenation during forearm ischemia", J. Appl. Physiol, 64, 2449-2457 (1988). 23 Liu, H., Hielscher , A. H...modification and role in hyperthermia", IEEE Trans. Sonics Ultrasonics , SU-31, 504-526 (1984). 25. Song, C. W., "Effect of local hyperthermia on blood flow and

  14. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard D.; Barber, David S.; Betsill, J. David; Littlfield, Adriane C.; Mohagheghi, Amir H.; Shanks, Sonoya T.; Yuldashev, Bekhzad; Salikhbaev, Umar; Radyuk, Raisa; Djuraev, Akram; Djuraev, Amwar; Vasilev, Ivan; Tolongutov, Bajgabyl; Valentina, Alekhina; Solodukhin, Vladimir; Pozniak, Victor

    2002-04-02

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

  15. Interactive Genetic Algorithm - An Adaptive and Interactive Decision Support Framework for Design of Optimal Groundwater Monitoring Plans

    Science.gov (United States)

    Babbar-Sebens, M.; Minsker, B. S.

    2006-12-01

    In the water resources management field, decision making encompasses many kinds of engineering, social, and economic constraints and objectives. Representing all of these problem dependant criteria through models (analytical or numerical) and various formulations (e.g., objectives, constraints, etc.) within an optimization- simulation system can be a very non-trivial issue. Most models and formulations utilized for discerning desirable traits in a solution can only approximate the decision maker's (DM) true preference criteria, and they often fail to consider important qualitative and incomputable phenomena related to the management problem. In our research, we have proposed novel decision support frameworks that allow DMs to actively participate in the optimization process. The DMs explicitly indicate their true preferences based on their subjective criteria and the results of various simulation models and formulations. The feedback from the DMs is then used to guide the search process towards solutions that are "all-rounders" from the perspective of the DM. The two main research questions explored in this work are: a) Does interaction between the optimization algorithm and a DM assist the system in searching for groundwater monitoring designs that are robust from the DM's perspective?, and b) How can an interactive search process be made more effective when human factors, such as human fatigue and cognitive learning processes, affect the performance of the algorithm? The application of these frameworks on a real-world groundwater long-term monitoring (LTM) case study in Michigan highlighted the following salient advantages: a) in contrast to the non-interactive optimization methodology, the proposed interactive frameworks were able to identify low cost monitoring designs whose interpolation maps respected the expected spatial distribution of the contaminants, b) for many same-cost designs, the interactive methodologies were able to propose multiple alternatives

  16. Groundwater Monitoring and Tritium-Tracking Plan for the 200 Area State-Approved Land Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    DB Barnett

    2000-08-31

    The 200 Area State-Approved Land Disposal Site (SALDS) is a drainfield which receives treated wastewater, occasionally containing tritium from treatment of Hanford Site liquid wastes at the 200 Area Effluent Treatment Facility (ETF). Since operation of the SALDS began in December 1995, discharges of tritium have totaled {approx}304 Ci, only half of what was originally predicted for tritium quantity through 1999. Total discharge volumes ({approx}2.7E+8 L) have been commensurate with predicted volumes to date. This document reports the results of all tritium analyses in groundwater as determined from the SALDS tritium-tracking network since the first SALDS wells were installed in 1992 through July 1999, and provides interpretation of these results as they relate to SALDS operation and its effect on groundwater. Hydrologic and geochemical information are synthesized to derive a conceptual model, which is in turn used to arrive at an appropriate approach to continued groundwater monitoring at the facility.

  17. Plan for Long-Term Monitoring of North American Geoid Change in Support of the U.S. National Spatial Reference System

    Science.gov (United States)

    Damiani, T.

    2016-12-01

    The US, Canada, and Mexico will adopt a new, shared spatial reference system in 2022, allowing the calculation of 1 cm-accurate orthometric heights in many places. The vertical datum portion of the reference system will be supported by a geoid model that spans the entire northwest hemisphere of Earth. The US National Geodetic Survey's goal is to create the geoid model to 1 cm accuracy, if possible, by collecting new airborne gravity data across the United States and improving geoid modeling techniques. Assuming this effort is successful­— a safe assumption as it is obtaining positive results from its 8 years of ongoing work­— the next challenge facing North American geodetic agencies will be maintaining the vertical datum. To do so requires monitoring geoid change in North America. First, we review sources of North American geoid change, their rates of change, and their spatial extents. Based on this, it is clear that monitoring will rely on NASA's 2017 Gravity Recovery and Climate Experiment- Follow On (GRACE-FO) mission. However, GRACE-FO will be similar to GRACE such that some gravity change below its measurement resolution is large enough to cause geoid change. Present-day ice melting (primarily in Greenland, Alaska, and the Canadian Rockies) and catastrophic-sized earthquakes or volcanic eruptions fall into this category. With current technology, the only ways to monitor these and other geoid change signals is with terrestrial absolute gravity measurements, likely with co-located GNSS height monitoring. We review the absolute gravity and GNSS networks in North America, placing emphasis stations with the longest and most reliable time series of absolute gravity and/or GNSS, and which smaller subset of sites have co-located measurements. Current networks are compared to the areas most in need of geoid monitoring. The result is two plans: 1. terrestrial gravity and GNSS coverage needed if GRACE-FO (or a similar mission) is successfully launched before 2022

  18. PERANAN HOME INDUSTRI EMPING MELINJO DALAM MENINGKATKAN PENDAPATAN KELUARGA DI KECAMATAN BURNEH KABUPATEN BANGKALAN

    Directory of Open Access Journals (Sweden)

    Yusrianto Sholeh

    2017-04-01

    Full Text Available ABSTRAKPenelitian ini bertujuan untuk mengetahui hal-hal sebagai berikut: (1 Untuk mengetahui pendapatan tenaga tenaga kerja Industri Emping Melinjo di Kecamatan Burneh Kabupaten Bangkalan, (2 Untuk mengetahui kontribusi pendapatan tenaga kerja terhadap pendapatan keluarga di sektor industri Emping Melinjo di Kecamatan Burneh Kabupaten Bangkalan. Hasil penelitian menunjukkan bahwa pendapatan keluarga di Kecamatan Burneh Kabupaten Bangkalan (Dengan jumlah pendapatan terkecil yaitu 38 orang atau 44% yaitu Rp 750.000-Rp 1.100.000. Kemudian pada jumlah pendapatan terbesar yang diperoleh tenaga kerja ialah Rp.2.150.000-Rp.2.500.000 berjumlah 2 orang atau 2%. Sedangkan kontribusi terhadap pendapatan di sektor industri Emping Melinjo di Kecamatan Burneh Kabupaten Bangkalan bahwa kontribusi pendapatan keluarga terbesar/Tinggi  sebanyak 24 orang atau 28 %, kemudian  nilai yang terkecil/sangat rendah ialah 10 orang atau 11 %.HOME INDUSTRY MELINJO ROLE IN IMPROVING INCOME FAMILIES IN THE DISTRICT DISTRICT BURNEH BANGKALANABSTRACTThis study aims to determine the following matters: (1 to determine the earnings of industrialworkers in the district chips melinjo Burneh Bangkalan district. (2 to determine the contribution of labor income to the family income in theindustrial sectorin the sub chips melinjo Burneh Bangkalan district.the result showed that the income of families in the district (with the smallest amount of income that is 38 or 44% is Rp 750.000-Rp 1.100.000, then the largest amount of income earned is labor Rp.2.150.000-2.500.000 amounted to 2 or 2%.While the contribution to earning in the industrial sector in the sub chips melinjo Burneh Bangkalan district that contributes the largest family incomeas many as 24 people or 28%, then the smallest value is 10 or 11%

  19. Empowerment impact assessment (EmpIA), a tool for poverty alleviation and capacity building

    CSIR Research Space (South Africa)

    Louw, MR

    2006-09-01

    Full Text Available : “Project specifications will provide minimum targets for employment of local labour and for training of labour and ABEs.” “Design specifications and contract documentation will be such to maximise the impact on empowerment.” 1.2 EmpIA and other...), the tendency is for the entire unemployed and under- employed segment to be attracted to the opportunities presented by the project (assuming the wage rate is < or = to the average wage in the area), instead of those with a genuine interest in the industry...

  20. Contraste empírico del CAPM en el mercado accionario chileno

    OpenAIRE

    Carlos A Díaz Contreras; Freddy H Higuera Cartes

    2012-01-01

    El modelo de valoración de activos de capital (Capital Asset Pricing Model - CAPM) es uno de los modelos más utilizados en la práctica para determinar el premio por riesgo de un activo individual o cartera. El presente trabajo realiza un contraste empírico del CAPM en el mercado accionario chileno, empleando las metodologías de serie temporal y de eficiencia media-varianza, basada en la estimación por el método generalizado de momentos (MGM). El contraste se llevó a cabo usando rentabilidades...

  1. Una Evaluación Empírica del Fondo de Comercio

    OpenAIRE

    Manuel Larrán Jorge; Juan Monterrey Mayoral; Eva Mulero Mendigorri

    2000-01-01

    En el presente trabajo se analizará bajo una perspectiva empírica uno de los activos empresariales más controvertidos como es el fondo de comercio. Dicha controversia no se materializa únicamente en su definición, sino también en su cuantificación y tratamiento contable, dando lugar en los últimos años a una importante línea de investigación centrada en la relevancia valorativa del fondo de comercio en particular y de los intangibles en general. Nuestro trabajo plantea un doble objetivo: en p...

  2. Evidencia empírica sobre la paridad del poder adquisitivo en México

    OpenAIRE

    Lorena Medina; Noriega, Antonio E.

    2001-01-01

    En este artículo se describe la aplicación de métodos recientes para probar la estacionariedad del tipo de cambio real peso/dólar, tomando en cuenta la presencia de un número desconocido de cambios estructurales en el nivel de largo plazo de la serie. En nuestra implementación empírica, la inferencia se basa en valores críticos fundamentados en técnicas de remuestreo. Se presenta evidencia contundente sobre la estacionariedad del tipo de cambio real, apoyando así la hipótesis de la paridad de...

  3. MRS Action Plan Task B report: Analyses of alternative designs and operating approaches for a Monitored Retrievable Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    Woods, W.D.; Jowdy, A.K.; Keehn, C.H.; Gale, R.M.; Smith, R.I.

    1988-12-01

    The Nuclear Waste Policy Amendments Act (NWPAA) instituted a number of changes in the DOE commercial nuclear waste management system. After passage of the Act, the DOE initiated a number of systems studies to reevaluate the role of Monitored Retrievable Storage (MRS) within the federal waste management system. This report summarizes the results of a study to determine the schedules and costs of developing those MRS facilities needed under a number of scenarios, with differing functions allocated to the MRS and/or different spent fuel acceptance schedules. Nine cases were defined for the system study, seven of which included an MRS Facility. The study cases or scenarios evaluated varied relative to the specific functions to be performed at the MRS. The scenarios ranged in magnitude from storage and shipment of bare, intact spent fuel to consolidating the spent fuel into repository emplacement containers prior to storage and shipment. Each scenario required specific modifications to be made to the design developed for the MRS proposal to Congress (the Conceptual Design Report). 41 figs., 326 tabs.

  4. Nighttime assaults: using a national emergency department monitoring system to predict occurrence, target prevention and plan services

    Directory of Open Access Journals (Sweden)

    Bellis Mark A

    2012-09-01

    Full Text Available Abstract Background Emergency department (ED data have the potential to provide critical intelligence on when violence is most likely to occur and the characteristics of those who suffer the greatest health impacts. We use a national experimental ED monitoring system to examine how it could target violence prevention interventions towards at risk communities and optimise acute responses to calendar, holiday and other celebration-related changes in nighttime assaults. Methods A cross-sectional examination of nighttime assault presentations (6.01 pm to 6.00 am; n = 330,172 over a three-year period (31st March 2008 to 30th March 2011 to English EDs analysing changes by weekday, month, holidays, major sporting events, and demographics of those presenting. Results Males are at greater risk of assault presentation (adjusted odds ratio [AOR] 3.14, 95% confidence intervals [CIs] 3.11-3.16; P 2 = 0.918; P  Conclusions To date, the role of ED data has focused on helping target nightlife police activity. Its utility is much greater; capable of targeting and evaluating multi-agency life course approaches to violence prevention and optimising frontline resources. National ED data are critical for fully engaging health services in the prevention of violence.

  5. Plasmodium falciparum-infected erythrocyte knob density is linked to the PfEMP1 variant expressed

    DEFF Research Database (Denmark)

    Subramani, Ramesh; Quadt, Katharina; Jeppesen, Anine Engholm;

    2015-01-01

    UNLABELLED: Members of the clonally variant Plasmodium falciparum erythrocyte membrane protein 1 (PfEMP1) family mediate adhesion of infected erythrocytes (IEs) to vascular receptors. PfEMP1 expression is normally confined to nanoscale knob protrusions on the IE surface membrane. To investigate...... the relationship between the densities of these IE surface knobs and the PfEMP1 variant expressed, we used specific antibody panning to generate three sublines of the P. falciparum clone IT4, which expresses the PfEMP1 variants IT4VAR04, IT4VAR32b, and IT4VAR60. The knob density in each subline was then determined...... by atomic force microscopy (AFM) and scanning electron microscopy (SEM) and compared to PfEMP1 and knob-associated histidine-rich protein (KAHRP) expression. Selection for uniform expression of IT4VAR04 produced little change in knob density, compared to unselected IEs. In contrast, selection for IT4VAR32b...

  6. Hydrogeology and groundwater quality at monitoring wells installed for the Tunnel and Reservoir Plan System and nearby water-supply wells, Cook County, Illinois, 1995–2013

    Science.gov (United States)

    Kay, Robert T.

    2016-04-04

    Groundwater-quality data collected from 1995 through 2013 from 106 monitoring wells open to the base of the Silurian aquifer surrounding the Tunnel and Reservoir Plan (TARP) System in Cook County, Illinois, were analyzed by the U.S. Geological Survey, in cooperation with the Metropolitan Water Reclamation District of Greater Chicago, to assess the efficacy of the monitoring network and the effects of water movement from the tunnel system to the surrounding aquifer. Groundwater from the Silurian aquifer typically drains to the tunnel system so that analyte concentrations in most of the samples from most of the monitoring wells primarily reflect the concentration of the analyte in the nearby Silurian aquifer. Water quality in the Silurian aquifer is spatially variable because of a variety of natural and non-TARP anthropogenic processes. Therefore, the trends in analyte values at a given well from 1995 through 2013 are primarily a reflection of the spatial variation in the value of the analyte in groundwater within that part of the Silurian aquifer draining to the tunnels. Intermittent drainage of combined sewer flow from the tunnel system to the Silurian aquifer when flow in the tunnel systemis greater than 80 million gallons per day may affect water quality in some nearby monitoring wells. Intermittent drainage of combined sewer flow from the tunnel system to the Silurian aquifer appears to affect the values of electrical conductivity, hardness, sulfate, chloride, dissolved organic carbon, ammonia, and fecal coliform in samples from many wells but typically during less than 5 percent of the sampling events. Drainage of combined sewer flow into the aquifer is most prevalent in the downstream parts of the tunnel systems because of the hydraulic pressures elevated above background values and long residence time of combined sewer flow in those areas. Elevated values of the analytes emplaced during intermittent migration of combined sewer flow into the Silurian aquifer

  7. Comercio, empleo y salarios en Colombia: Teoría y evidencia empírica

    Directory of Open Access Journals (Sweden)

    De Lombaerde Philippe

    2002-08-01

    Full Text Available El autor parte de la observación de que el debate academico sobre la apertura en Colombia es un debate demasiado polarizado, y sostiene que se requiere una combinación de teorías y de enfoques para poder analizar el tema, y un mayor enfasis en el análisis empírico. Con base en un análisis de la evidencia disponible hasta el momento, llega a las siguientes conclusiones; ies la combinación de la políticas de apertura, por un lado, y las tendencias en materia de cambio tecnologico y de cambio a nivel de los facotres de producción, por otro que explica el comportamiento de las variables comerciales, laborales y de producción; iiaunque ciertos flujos comerciales responden a la logica de los modelos clasicos y neoclasicos, la aperura en su conjunto no se captan en ellos; iiien cuanto a la formulacion de politicas industriales y comerciales alternativas, deben sustentarse teórica y empíricamente, y deben estar acompañadas por un analisis detallado de los costos y beneficios económicos, y sociales y de los efectos redistributivos; ivno hay duda de que la apertura este relacionada con los efectos adversos en el empleo y los salarios de los 90's.

  8. First Stars XIV. Sulphur abundances in extremely metal-poor (EMP) stars

    CERN Document Server

    Spite, Monique; Andrievsky, S M; Korotin, S A; Depagne, E; Spite, F; Bonifacio, P; Ludwig, H -G; Cayrel, R; Francois, P; Hill, V; Plez, B; Andersen, J; Barbuy, B; Beers, T C; Molaro, P; Nordstrom, B; Primas, F

    2010-01-01

    Sulphur is important: the site of its formation is uncertain, and at very low metallicity the trend of [S/Fe] against [Fe/H] is controversial. Below [Fe/H]=-2.0, [S/Fe] remains constant or it decreases with [Fe/H], depending on the author and the multiplet used in the analysis. Moreover, although sulphur is not significantly bound in dust grains in the ISM, it seems to behave differently in DLAs and in old metal-poor stars. We aim to determine precise S abundance in a sample of extremely metal-poor stars taking into account NLTE and 3D effects. NLTE profiles of the lines of the multiplet 1 of SI have been computed using a new model atom for S. We find sulphur in EMP stars to behave like the other alpha-elements, with [S/Fe] remaining approximately constant below [Fe/H]=-3. However, [S/Mg] seems to decrease slightly as a function of [Mg/H]. The overall abundance patterns of O, Na, Mg, Al, S, and K are best matched by the SN model yields by Heger & Woosley. The [S/Zn] ratio in EMP stars is solar, as found a...

  9. Management Plan for Experimental Reintroduction of Sockeye into Skaha Lake; Proposed Implementation, Monitoring, and Evaluation, 2004 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wright, Howie; Smith, Howard (Okanagan Nation Alliance, Fisheries Department, Westbank, BC, Canada)

    2004-01-01

    was largely supported but with the proviso that there should be a thorough evaluation and reporting of progress and results. A 2004 start on implementation and monitoring has now been proposed.

  10. Design of Intelligent Monitoring and Path Planning in Picking Robot%采摘机器人智能监控和路径规划设计研究

    Institute of Scientific and Technical Information of China (English)

    吴芳; 汪小志

    2016-01-01

    In order to improve the picking robot autonomous navigation and automatic positioning capability and improve the accuracy of path planning for the machine vision, based on MSP430F149 of TI company,it designs a function auto-matic picking robot with the monitoring terminal and GPS navigation, the robot path planning in real-time processing, communication, location and alarm integration and automation control function.Through the test, the MSP430 F149 micro controller has the advantages of low power consumption, small size, simple operation, and easy to maintain the system management and maintenance.5 robot path planning for the overall running accuracy and path planning of mobile time u-tilization, path planning leakage recovery rate were tested, it was found by test that five kinds of path planning method for various index to test the effect best, combined with MSP430F149 MCU and PID algorithm, to realize picking robot, auto-matic picking function, which can improve the robot's picking accuracy and provides a valuable reference for the picking robot intelligent design.%为了提高采摘机器人自主导航和自动化定位能力,提升机器视觉的路径规划精度,基于 TI 公司的MSP430 F149 单片机,设计了一款具有监控终端和GPS导航功能的自动采摘机器人,实现了机器人路径规划实时处理、通讯、定位、报警一体化和自动化控制功能. 通过测试发现,MSP430F149 单片机具有功耗低、体积小、操作简单,便于系统管理维护等优点. 对机器人5 种路径规划的总体行驶精度路、径规划的移动时间利用率、路径规划的漏采率进行了测试,通过测试发现:5 种路径规划中套行法的各种指标测试效果最好. 同时,结合MSP430 F149 单片机和PID算法,实现了采摘机器人高效自动化采摘功能,提高了机器人的采摘精度,为采摘机器人的智能化设计提供了较有价值的参考 .

  11. Empédocles entre Mýthos e Lógos : um estudo sobre a relação entre os poemas de Empédocles depois do Papiro de Estrasburgo

    OpenAIRE

    Leão, Eryc de Oliveira

    2013-01-01

    Essa dissertação de mestrado tem como objetivo principal fornecer evidências de ordem filosófica, sociológica, filológica e historiográfica, para o fato da unidade temática dos dois poemas de Empédocles, intitulados “Sobre a Natureza” e “Purificações”. Tal fato encontra-se registrado na evidência direta do texto de Empédocles conhecido como Papiro de Estrasburgo, publicado por Martin-Primavesi (1999). Para ficar apenas com o exemplo mais importante, no conjunto d do Papiro de Estrasburgo...

  12. La ilusión científica en la macroeconomía empírica

    Directory of Open Access Journals (Sweden)

    Summers Lawrence H.

    1995-12-01

    Full Text Available Muchos macroeconomistas y la mayoría de los econometristas creen y enseñan a sus estudiantes que 1 el trabajo empírico en macroeconomía debe dedicarse a identificar los ‘parámetros estructurales básicos’ que representan las preferencias y la tecnología; 2 el mejor trabajo empírico en macroeconomía prueba formalmente las hipótesis esenciales derivadas rigurosamente de la teoría económica; 3 las técnicas estadísticas sofisticadas pueden jugar un papel importante para determinar la causación en sistemas con muchas variables independientes. Estas creencias constituyen el núcleo de los que yo llamo la ilusión científica en la macroeconomía empírica.

  13. Necessity of re-evaluation of estramustine phosphate sodium (EMP) as a treatment option for first-line monotherapy in advanced prostate cancer.

    Science.gov (United States)

    Kitamura, T

    2001-02-01

    Estramustine phosphate sodium (EMP) was first introduced in the early 1970s for the treatment of prostate cancer, when EMP was supposed to have the dual effect of estrogenic activity and cytotoxicity. For the following decades, it was used mainly in hormone-refractory cases, with a conventional dosage of 4-9 capsules/day, which showed a 30-35% objective response rate. However, a very limited number of cases have been reported that used EMP as a first-line monotherapy in the conventional dosage. One study showed a response rate of 82%, which is at least as effective as conventional estrogen (diethylstilbestrol; DES) monotherapy. Nevertheless, EMP was almost abandoned for the treatment of prostate cancer because of severe adverse side-effects, especially in the cardiovascular system and gastrointestinal tract. Recently, two facts have become evident. First, EMP interferes with cellular microtubule dynamics but does not show alkylating effects. Second, EMP is able to produce a complex with calcium when dairy products are taken concomitantly with EMP, resulting in a decrease in the absorption rate of EMP from the gut. Many clinical trials have been undertaken without warning against concomitant dairy product intake since the introduction of EMP. This fact will jeopardize almost all the clinical trials performed before 1990. It is considered that response rates have been underestimated and better results could have been obtained because side-effects decrease dose-dependently. Low-dose EMP monotherapy (2 capsules/day) has been performed infrequently in previously untreated advanced prostate cancer. The only large trial by the European Organization for Research and Treatment of Cancer in 1984 was biased in selecting patients. Nevertheless, the response rate of EMP is comparable to that of DES. In this study, the adverse side-effects of EMP were less than that of DES. Recently, a study was conducted at the University of Tokyo of 11 patients with advanced prostate cancer on

  14. Practical SPI Planning

    Science.gov (United States)

    Landaeta, José Francisco; García, Javier; Amescua, Antonio

    This paper presents a practical procedure named P4SPI for planning, monitoring and closing an SPI. Planning activities are performed using PMBOK's process areas as a reference; monitoring activities using Six Sigma tools and techniques and closing activities using gathering qualitative and quantitative information about the SPI Implementation. These activities are supported by office templates.

  15. Hemiparesia esquerda consecutiva a empeçonhamento: Por Bothrops Jararacussu

    Directory of Open Access Journals (Sweden)

    Napoleão L. Teixeira

    1944-09-01

    Full Text Available O A. apresenta uma observação de hemiparesia esquerda, consecutiva a envenenamento por Bothrops Jararacussu. É o segundo caso que publica, com idêntica etiologia; além das suas, há duas outras observações semelhantes, de Octávio de Magalhães. Depois de discorrer sobre as hemiplegias cerebrais infantis - mais comuns - lembra que estas nem sempre se acompanham de espasticidade, podendo apresentar-se, raramente, com hipotonia muscular, ou mesmo de coréia, atetose, ou movimentos córeo-atetóticos que falam em favor de comprometimento extrapiramidal. Assinala, também, que crises epileptiformes - generalizadas ou parciais - podem ocorrer, o mesmo se podendo dizer de distúrbios psíquicos. Traduzir-se-iam, estes, por déficit intelectual marcado, podendo ir desde a debilidade mental até a idiotia; ou então, mesmo quando não há aparente comprometimento da esfera intelectual, por perturbações da afetividade, da vontade e do pragmatismo. Passando em revista as causas mais frequentes das hemiplegias cerebrais infantis, abre lugar, dentre elas, para os empeçonhamentos ofídico e escorpiônico (Magalhães e Guimarães. Estuda, a seguir, a patogenia das hemiplegias no decurso dos referidos empeçonhamentos, alinhando as hipóteses correntes, da preferência de conceituadas autoridades no assunto. Transcreve, finalmente, sua observação clínica, da qual se pode concluir, sem dúvida possível, haver, no caso "que apresenta, estreita e imediata ligação entre o envenenamento ofídico e a hemiparesia em estudo. O observado seria portador, além do mais, de crises epileptiformes generalizadas, aparecidas logo a seguir ao empeçonhamento. Além da fotografia do caso que apresenta, mostra-nos o A. outra, de caso anteriormente publicado, este, porém, de hemiplegia cerebral infantil típica, instalada aos 11 anos, após picada de Bothrops jararaca.

  16. What Influences Chinese Adolescents’ Choice Intention between Playing Online Games and Learning? Application of Theory of Planned Behavior with Subjective Norm Manipulated as Peer Support and Parental Monitoring

    Science.gov (United States)

    Wang, Jia; Liu, Ru-De; Ding, Yi; Liu, Ying; Xu, Le; Zhen, Rui

    2017-01-01

    This study investigated how and why Chinese adolescents choose between playing online games and doing homework, using the model of the theory of planned behavior (TPB) in which the subjective norm was manipulated as two sub-elements (peer support and parental monitoring). A total of 530 students from an elementary school and a middle school in China were asked to complete the measures assessing two predictors of TPB: attitude and perceived behavioral control (PBC). Next, they completed a survey about their choice intention between playing an online game and doing homework in three different situations, wherein a conflict between playing online games and doing homework was introduced and subjective norm was manipulated as peers supporting and parents objecting to playing online games. The results showed that adolescents’ attitude and PBC, as well as the perception of obtaining or not obtaining support from their peers and caregivers (manipulated subjective norm), significantly influenced their choice intention in online gaming situations. These findings contribute to the understanding of the factors affecting adolescents’ online gaming, which has been a concern of both caregivers and educators. With regard to the theoretical implications, this study extended previous work by providing evidence that TPB can be applied to analyze choice intention. Moreover, this study illuminated the effects of the separating factors of subjective norm on choice intention between playing online games and studying. PMID:28458649

  17. The Duffy-Binding-Like β domain (DBLβ) of the Plasmodium falciparum erythrocyte membrane protein 1 (PfEMP1) variant, PFD1235w, binds ICAM1

    DEFF Research Database (Denmark)

    Andersen, M. A.; Bengtsson, A.; Rask, Thomas Salhøj

    2012-01-01

    Plasmodium falciparum is by far the most virulent human malaria parasite. P. falciparum variant erythrocyte surface antigens, known as PfEMP1, play a crucial role in malaria pathogenesis as they mediate adhesion to host endothelial receptors. The PfEMP1 variant, PFD1235w, encoded by the 3D7 group...

  18. Insect cells are superior to Escherichia coli in producing malaria proteins inducing IgG targeting PfEMP1 on infected erythrocytes

    DEFF Research Database (Denmark)

    Victor, Michala E; Bengtsson, Anja; Andersen, Gorm

    2010-01-01

    The PFD1235w Plasmodium falciparum erythrocyte membrane protein 1 (PfEMP1) antigen is associated with severe malaria in children and can be expressed on the surface of infected erythrocytes (IE) adhering to ICAM1. However, the exact three-dimensional structure of this PfEMP1 and its surface-expos...

  19. Structural Conservation Despite Huge Sequence Diversity Allows EPCR Binding by the PfEMP1 Family Implicated in Severe Childhood Malaria

    DEFF Research Database (Denmark)

    Lau, Clinton K.Y.; Turner, Louise; Jespersen, Jakob S.;

    2015-01-01

    The PfEMP1 family of surface proteins is central for Plasmodium falciparum virulence and must retain the ability to bind to host receptors while also diversifying to aid immune evasion. The interaction between CIDRa1 domains of PfEMP1 and endothelial protein C receptor (EPCR) is associated...

  20. La depresión en la infancia desde la perspectiva de las taxonomías empíricas

    OpenAIRE

    1998-01-01

    En este trabajo se analiza la depresión infantil desde el modelo de taxonomías empíricas propuesto por Achenbach y Edelbrock. Se revisan algunos aspectos diferenciales en el diagnóstico de la depresión en menores y adultos. La parte empírica se cent