WorldWideScience

Sample records for monitor project performance

  1. Visual Intelligent Robot Performance Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to develop a Visual Intelligent Robot Performance Monitor (VIRPM) that will help crew members maintain situation awareness of robot performance more...

  2. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2013-01-01

    Today, with the growth of complex projects, stakeholder involvement in projects, advances in computer technology for dashboard designs, metrics, and key performance indicators for project management have become an important focus. This Second Edition of the bestselling book walks readers through everything from the basics of project management metrics and key performance indicators to establishing targets and using dashboards to monitor performance. The content is aligned with PMI's PMBOK Guide and stresses "value" as the main focal point.

  3. Adding Shareholder Value through Project Performance Measurement, Monitoring & Control

    NARCIS (Netherlands)

    M.M. Akalu; J.R. Turner (Rodney)

    2002-01-01

    textabstractWe present the various views and methods of measuring and controlling project performance, and factors affecting a project. The review indicates that there is a shift in the type and understanding of factors of project success or failure. However, the presence of various measurement meth

  4. Nova Scotia S-2000 monitoring project. Vol. 1, Performance summary

    Energy Technology Data Exchange (ETDEWEB)

    Makuch, P.; Harrison, S.J. [Queen`s Univ., Kingston, ON (Canada). Solar Calorimetry Lab.

    1994-12-01

    Electric utility companies have increasingly been evaluating and implementing demand management and conservation. As a result there has been growing interest in potential energy savings and capacity benefits of Solar Domestic Hot Water (SDHW) technologies. A computer simulation study showed that SDHW can provide significant savings in hot water heating. Natural Resources Canada through the Canada Centre for Mineral and Energy Technology (CANMET) initiated the S-2000 program. The S-2000 program was initiated to promote cooperation between CANMET, electric utilities and provincial governments interested in determining whether SDHW systems can reduce peak energy demand and pollution emissions. 60 SDHW systems were installed in Nova Scotia. Systems were monitored by Thermo Dynamics Limited and analyzed by the Solar Calorimetry Laboratory at Queen`s University. Results were produced for the monitoring period from October 1993 to August 1994. Results for 32 of the Nova Scotia systems showed winter and summer solar energy supplies of 14.8 MWh and 30 MWh respectively. The system efficiency was determined to be 28.4%. The system performance was consistent with predictions made from computer simulations, with the exception of an unexpectedly severe winter. The solar energy contribution during the winter was lower than that predicted for typical weather conditions. Of the systems monitored daily average hot water use was lower than the reference 239 L/day value. Monitoring of the Nova Scotia systems will continue through 1995 and strategies will be investigated. 15 figs., 5 tables

  5. High Performance Fiber-Optic Sensor for Environmental Monitoring Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Los Gatos Research (LGR) proposes to develop a low-cost, compact, lightweight, rugged and easy-to-use environmental monitoring optical fiber sensor device based on...

  6. High-Performance Contaminant Monitor for Spacecraft Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Vision for Space Exploration demands increasing reliance on real-time trace gas monitors onboard spacecraft. Present grab samples and badges will be inadequate...

  7. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    With the growth of complex projects, stakeholder involvement, and advancements in visual-based technology, metrics and KPIs (key performance indicators) are key factors in evaluating project performance. Dashboard reporting systems provide accessible project performance data, and sharing this vital data in a concise and consistent manner is a key communication responsibility of all project managers. This 3rd edition of Kerzner’s groundbreaking work includes the following updates: new sections on processing dashboard information, portfolio management PMO and metrics, and BI tool flexibility. PPT decks by chapter and a test bank will be available for use in seminar presentations and courses.

  8. Project on restaurant energy performance: end-use monitoring and analysis. Appendixes I and II

    Energy Technology Data Exchange (ETDEWEB)

    Claar, C.N.; Mazzucchi, R.P.; Heidell, J.A.

    1985-05-01

    This is the second volume of the report, ''The Porject on Restaurant Energy Performance - End-Use Monitoring and Analysis''. The first volume (PNL-5462) contains a summary and analysis of the metered energy performance data collected by the Project on Restaurant Energy Performance (PREP). Appendix I, presented here, contains monitoring site descriptions, measurement plans, and data summaries for the seven restaurants metered for PREP. Appendix II, also in this volume, is a description of the PREP computer system.

  9. Flight Systems Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR Phase I project will develop the Flight System Monitor which will use non-intrusive electrical monitoring (NEMO). The electronic system health of...

  10. Spacecraft Power Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR Phase I project will develop the Spacecraft Power Monitor (SPM) which will use non-intrusive electrical monitoring (NEMO). NEMO transforms the power...

  11. Aerospace Systems Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Proposal Title: Aerospace Systems Monitor PHASE 1 Technical Abstract: This Phase II STTR project will continue development and commercialization of the Aerospace...

  12. British Columbia S-2000 monitoring project, vol. 1, performance summary: Interim report, June 1993--December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Makuch, P.D.

    1994-12-31

    The S-2000 program was established to promote cooperation between CANMET, electrical utilities, and provincial governments interested in evaluation on whether solar domestic hot water (SDHW) systems are suited to the reduction of peak electrical load levels and pollutant emission control through cost-effective energy displacement. Current activity consists of cooperative pilot projects between government and utilities to install and monitor several SDHW systems across Canada. As a first step to demonstrate the potential of SDHW in British Columbia, eight systems were purchased by B.C. Hydro and West Kootenay Power and installed on private residences throughout the province. This interim report summarizes the monitoring results from June-December 1993.

  13. Somebody is Watching EFL Classroom: A project on Improving Students’ Performance Level with a Monitoring System

    Directory of Open Access Journals (Sweden)

    Suna Akalın

    2011-04-01

    Full Text Available This study aims to explain a project on supporting students‟ speaking skills with a monitoring system. The monitoring system is aimed at controlling the usage of English continually in the afternoons, in weekdays, at a room which is being controlled by cameras. The absence of a teacher in the room is more comfortable than the cameras watching. This is a report of the Project implemented in the Department of teaching English, Ataturk University, Erzurum, Turkey. This study was conducted to find out how the usage of English in actual life situations contributes to learners‟ ability to develop their speaking abilities. The results revealed that learners‟ teacher‟s absence anxiety, instructor‟s attitude toward the speech room, course flexibility in the speech room, course quality, perceived usefulness and perceived ease of use, are the critical factors affecting learners‟ perceived satisfaction.

  14. Aerospace Systems Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase I STTR project will demonstrate the Aerospace System Monitor (ASM). This technology transforms the power distribution network in a spacecraft or aircraft...

  15. Monitoring Staff Performance: A Plan for Quality Control in Project Follow Through.

    Science.gov (United States)

    Jackson, Donald A.; Bushell, Don, Jr.

    This report describes a staff training and performance monitoring system for elementary school teachers, teacher aides, and parent aides participating in the Behavior Analysis Follow Through (B.A.) compensatory education program. The B.A. model involves the use of additional staff, individualized instruction, programmed curriculum materials, and a…

  16. Project on Restaurant Energy Performance: end-use monitoring and analysis

    Energy Technology Data Exchange (ETDEWEB)

    Claar, C.N.; Mazzucchi, R.P.; Heidell, J.A.

    1985-05-01

    Although energy bills for restaurants throughout the United States exceed 5 billion dollars annually, very little has been documented with respect to when and how restaurants use energy, or how such use can be reduced cost-effectively. This report summarizes the results of a multiyear collaborative research effort, designed to collect information on end-use energy consumption. Objective is to reveal the quantities and profiles of energy consumption of typical food service operations by time of day and end use. This information, when examined in conjunction with building characteristics, allows detailed study of energy use cause and effect and energy conservation potential. Seven representative monitoring sites were selected, a computerized data acquisition network was designed and implemented, and detailed energy performance was compiled for a 1 year period (July 1983 through June 1984). Each of the seven facilities monitored was selected to represent the seven most common restaurant types and to provide information on a wide variety of commonly used restaurant equipment. Preliminary findings are presented.

  17. Integrated monitoring plan for the Hanford groundwater monitoring project

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, M.J.; Dresel, P.E.; McDonald, J.P.; Mercer, R.B.; Newcomer, D.R.; Thornton, E.C.

    1998-09-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy (DOE) manages these activities through the Hanford Groundwater Monitoring Project (groundwater project), which is the responsibility of Pacific Northwest National Laboratory. The groundwater project does not include all of the monitoring to assess performance of groundwater remediation or all monitoring associated with active facilities. This document is the first integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; other, established monitoring plans by reference; and a master well/constituent/frequency matrix for the entire Hanford Site.

  18. Air Sensor Kit Performance Testing and Pollutant Mapping Supports Community Air Monitoring Project

    Science.gov (United States)

    EPA is collaborating on a research project with the South Coast Air Quality Management District in Diamond Bar, Calif. to gain an enhanced understanding of fine particulate matter (PM2.5) and ozone concentrations across the study area.

  19. Nova Scotia S-2000 monitoring project, Vol. 1: Performance summary: Interim report for the period October 1993 to August 1994

    Energy Technology Data Exchange (ETDEWEB)

    Makuch, P.

    1994-12-31

    Previous simulation studies have indicated that a significant potential exists for utilities to displace capacity and energy demand through the use of solar domestic hot water (SDHW) systems in various Canadian locations. This has led to initiation of the S-2000 program, designed to provide utilities with comprehensive field trials of SDHW systems. This document describes the S-2000 program activities in Nova Scotia, which involved cooperative pilot projects between utilities and government to install and monitor 32 systems, all located in Bedford. The SDHW systems selected for the study were manufactured by Thermo Dynamics Ltd of Dartmouth and consisted of a solar preheat storage tank and a separate electric auxiliary hot water tank, all retrofitted upstream of existing hot water tanks in each residence. The report provides detailed performance summaries for all 32 systems, including solar energy delivered and solar fraction.

  20. Islay LIMPET project monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Heath, T.

    2002-07-01

    Wavegen was contracted by the DTI as part of its Sustainable Energy Programmes to monitor and report on the final stages of the construction, installation of turbo-generation equipment, commissioning and operation of the LIMPET wave energy system. The report discusses the choice of technology, where the system was installed, power take off, construction of the collector, installation of the turbo-generator, maintenance, operation, management and planning issues. The performance of the system was found to be poorer than expected and the reasons for this were identified. The main conclusions were that the system is sufficiently robust to operate in the marine environment and downtimes are expected to be short.

  1. Lunar Health Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — During the Phase II Lunar Health Monitor program, Orbital Research will develop a second generation wearable sensor suite for astronaut physiologic monitoring. The...

  2. Lunar Health Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Orbital Research has successfully demonstrated a dry electrode (no electrolyte or gel required) for heart rate and ECG monitoring. Preliminary data has indicated...

  3. Multispectral Particle Absorption Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovation Research Phase II project concerns the development of a multi-wavelength monitor that will provide rapid, real-time measurement of the...

  4. Multispectral Particle Absorption Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovation Research Phase I project concerns the development of a multi-wavelength monitor that will provide rapid, real-time measurement of the...

  5. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  6. British Columbia S-2000 monitoring project. Volume 1: Performance summary interim report for the period June 1993 to December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Makuch, P.D.; Harrison, S.J

    1994-02-01

    The Canadian S-2000 program was established to provide utilities with comprehensive field trials of solar domestic hot water (SDHW) heating systems, which have been identified as potentially able to provide significant energy savings. The main objective of S-2000 is to promote cooperation between governments and electrical utilities interested in evaluating whether SDHW systems are suited to utility load management goals, particularly the reduction of peak demand levels and pollutant emission control through cost-effective energy displacement. Current activity in the program consists of cooperative government/utility pilot projects to install and monitor several SDHW systems across Canada. As a first step to demonstrate the potential of SDHW in British Columbia, eight systems were purchased by provincial utilities, installed at private residences, and monitored. The monitoring results over the June-December 1993 period are summarized. Six of the systems are functioning as expected and show an average solar fraction of 42.2% over the monitoring period. These systems show good agreement with predicted results, but the two remaining systems are operating below projected levels due to equipment malfunctions. Only three of the systems had a daily load greater than the 239 l/d average for a typical Canadian family. Calculations indicate that a home using 350 l/d of hot water and a properly oriented collector should get 45.7% of the hot water heating load from solar energy (11.1 GJ of the 27.3 GJ total annual load). 4 refs., 18 figs., 11 tabs.

  7. Evaluating 5-Years Performance Monitoring of 1 MW Building Integrated PV Project in Nieuwland, Amersfoort, the Netherlands

    NARCIS (Netherlands)

    van Sark, W.G.J.H.M.; de Keizer, A.C.; ter Horst, E.; Molenbroek, E.C.

    2007-01-01

    The performance of about 400 decentralised PV systems has been evaluated for a period of five years (2001-2006). The systems are situated in the urban area Nieuwland in the town of Amersfoort in the Netherlands and are part of one of the largest decentralised PV projects in the world. The evaluated

  8. Southern Fine Particulate Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Ashley Williamson

    2003-05-31

    This final project report presents experimental details, results and analysis of continuous onsite ambient fine particulate data at the North Birmingham sampling site during the October, 2001-September, 2002 study period.The host site for these measurement activities is the North Birmingham PM monitoring station by the Jefferson County Health Department in Birmingham, AL.The continuous data include PM{sub 2.5} mass concentrations measured by TEOM, particle sulfate using the R&P 8400S monitor, particle size distributions measured by SMPS and APS monitors, and PM{sub 2.5} light scattering extinction coefficient as measured by nephelometer. During the course of the project, measurement intercomparison data were developed for these instruments and several complementary measurements at the site. The report details the instrument set and operating procedures and describes the resulting data. Report subsections present an overview summary of the data, followed by detailed description of the systematic time behavior of PM{sub 2.5} and other specific particulate size fractions. Specific subsections are included for particle size distribution, light scattering, and particle sulfate data. The final subsection addresses application of the measurements to the practical questions of fine PM generation and transport, source attribution, and PM{sub 2.5} management strategies.

  9. Computer monitors drilling performance

    Energy Technology Data Exchange (ETDEWEB)

    1984-05-01

    Computer systems that can monitor over 40 drilling variables, display them graphically, record and transmit the information have been developed separately by two French companies. The systems, Vigigraphic and Visufora, involve the linking of a master computer with various surface and downhole sensors to measure the data on a real-time (as experienced) basis and compute the information. Vigigraphic is able to produce graphic displays grouped on four screens - drilling, tripping, geological and mud data. It computes at least 200 variables from the sensor readings, and it can store over 100 variables. Visufora allows the operator to group the drilling variables as desired. It can monitor and analyze surface and downhole parameters. The system can be linked with MWD tools. Twenty channels of input are assigned to surface values and the remaining 20 channels can be used to monitor downhole instrumentation.

  10. BPA genetic monitoring - BPA Genetic Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Initiated in 1989, this study monitors genetic changes associated with hatchery propagation in multiple Snake River sub-basins for Chinook salmon and steelhead. We...

  11. Adverse event detection, monitoring, and evaluation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR project delivers a single-sensor structural health-monitoring (SHM) system that uses the impedance method to monitor structural integrity, wave propagation...

  12. Performance Monitoring of Ships

    DEFF Research Database (Denmark)

    Hansen, Søren Vinther

    in the models have been identified. The models used in this work are based on empirical relations or based on regression analyses of model tests and full-scale trials. In order to achieve valid results the conditions where performance is estimated have to be inside the boundaries of the model. Filters have been...... and the ability of identifying the events that improves performance e.g. propeller and hull clean....

  13. Monitoring preload performance

    Energy Technology Data Exchange (ETDEWEB)

    Russell, J.B.; Lawrence, C.A.; Paddock, M.W.; Ross, D.

    1999-07-01

    Reconstruction of State Highway 29 (STH 29) in north central Wisconsin was complicated by two separate deposits of compressible peat and organic silt within the highway right-of-way. The deposits ranged from about 3 to 11 meters in thickness over about 900 meters of the reconstruction alignment. Excavation and removal of the peat and organic silt was evaluated, but was determined to be cost prohibitive. Preloading was determined to be a cost effective and environmentally friendly solution, and was implemented at both deposits to induce the expected consolidation and long-term secondary compression of the final highway embankment and pavement sections. This paper presents the design, instrumentation, and rheological modeling procedures used to complete the project.

  14. SOUTHERN FINE PARTICULATE MONITORING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2002-04-01

    This quarterly report presents results and analysis of continuous onsite ambient fine particulate data at the North Birmingham sampling site during the January-March, 2002 study period. The continuous data include PM{sub 2.5} mass concentrations measured by TEOM, particle sulfate using the R&P 8400S monitor, particle size distributions measured by SMPS and APS monitors, and PM{sub 2.5} light scattering extinction coefficient as measured by nephelometer. Some instrumental issues were noted with the upgrade of the APS model 3320 are described in the report, as well as preliminary performance indications for the upgraded instrument. During the quarter preliminary data analysis and modeling studies were conducted to test the potential of the North Birmingham site data for source attribution analyses. Our initial assessment has continued to be optimistic in this regard due to the location of the site relative to several important classes of local and midrange emission sources. We anticipate that these analyses will provide good separations of the effects of major source classes and spatial source clusters, and will provide useful information relevant to PM{sub 2.5} implementation strategies.

  15. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  16. Volunteers for Air Monitoring Project (VAMP).

    Science.gov (United States)

    Oak Ridge National Lab., TN.

    An education and communication project of the Environment and Technology Assessment Program, Oak Ridge National Laboratory, Tennessee, is described in this report. The project for monitoring air dustfall resulted in the largest citizen-scientist air monitoring effort in the history of our nation. Nearly 21,000 public secondary school students and…

  17. Spacecraft Cabin Particulate Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to design, build and test an optical extinction monitor for the detection of spacecraft cabin particulates. This monitor will be sensitive to particle...

  18. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  19. Near-facility environmental monitoring quality assurance project plan

    Energy Technology Data Exchange (ETDEWEB)

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  20. Hybrid Modeling Improves Health and Performance Monitoring

    Science.gov (United States)

    2007-01-01

    Scientific Monitoring Inc. was awarded a Phase I Small Business Innovation Research (SBIR) project by NASA's Dryden Flight Research Center to create a new, simplified health-monitoring approach for flight vehicles and flight equipment. The project developed a hybrid physical model concept that provided a structured approach to simplifying complex design models for use in health monitoring, allowing the output or performance of the equipment to be compared to what the design models predicted, so that deterioration or impending failure could be detected before there would be an impact on the equipment's operational capability. Based on the original modeling technology, Scientific Monitoring released I-Trend, a commercial health- and performance-monitoring software product named for its intelligent trending, diagnostics, and prognostics capabilities, as part of the company's complete ICEMS (Intelligent Condition-based Equipment Management System) suite of monitoring and advanced alerting software. I-Trend uses the hybrid physical model to better characterize the nature of health or performance alarms that result in "no fault found" false alarms. Additionally, the use of physical principles helps I-Trend identify problems sooner. I-Trend technology is currently in use in several commercial aviation programs, and the U.S. Air Force recently tapped Scientific Monitoring to develop next-generation engine health-management software for monitoring its fleet of jet engines. Scientific Monitoring has continued the original NASA work, this time under a Phase III SBIR contract with a joint NASA-Pratt & Whitney aviation security program on propulsion-controlled aircraft under missile-damaged aircraft conditions.

  1. Wearable Health Monitoring Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this proposal is to demonstrate the feasibility of producing a wearable health monitoring system for the human body that is functional, comfortable,...

  2. Spacecraft Cabin Particulate Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We have built and tested an optical extinction monitor for the detection of spacecraft cabin particulates. This sensor sensitive to particle sizes ranging from a few...

  3. Crew Cerebral Oxygen Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase II SBIR proposal is aimed at developing a non-invasive, optical method for monitoring crew member state of awareness in operational environments. All...

  4. Crew Cerebral Oxygen Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase I SBIR proposal is aimed at developing a non-invasive, optical method for monitoring the state of consciousness of crew members in operational...

  5. Wearable Health Monitoring Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this proposal is to demonstrate the feasibility of producing a wearable health monitoring system for the human body that is functional, comfortable,...

  6. Integrated monitoring and surveillance system demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Aumeier, S.E.; Walters, G. [Argonne National Lab., Idaho Falls, ID (United States); Kotter, D.; Walrath, W.M.; Zamecnik, R.J. [Lockheed-Martin Idaho Technologies Company, Idaho Falls, ID (United States)

    1997-07-01

    We present a summary of efforts associated with the installation of an integrated system for the surveillance and monitoring of stabilized plutonium metals and oxides in long-term storage. The product of this effort will include a Pu storage requirements document, baseline integrated monitoring and surveillance system (IMSS) prototype and test bed that will be installed in the Fuel Manufacturing Facility (FMF) nuclear material vault at Argonne National Laboratory - West (ANL-W), and a Pu tracking database including data analysis capabilities. The prototype will be based on a minimal set of vault and package monitoring requirements as derived from applicable DOE documentation and guidelines, detailed in the requirements document, including DOE-STD-3013-96. The use of standardized requirements will aid individual sites in the selection of sensors that best suit their needs while the prototype IMSS, located at ANL-W, will be used as a test bed to compare and contrast sensor performance against a baseline integrated system (the IMSS), demonstrate system capabilities, evaluate potential technology gaps, and test new hardware and software designs using various storage configurations. With efforts currently underway to repackage and store a substantial quantity of plutonium and plutonium-bearing material within the DOE complex, this is an opportune time to undertake such a project. 4 refs.

  7. Monitored Geologic Repository Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    P. M. Curry

    2001-01-30

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6).

  8. Monitored Geologic Repository Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    P. Curry

    2001-06-26

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the Yucca Mountain Site Characterization Project Requirements Document (YMP RD) (YMP 2001a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M&O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6).

  9. Monitoring the effectiveness evaluation of investment projects

    Directory of Open Access Journals (Sweden)

    Skopin Alex O.

    2012-02-01

    Full Text Available The article raised the question of monitoring regulatory evaluation of the effectiveness of regional investment projects. This is justified by the fact that the current regulatory framework defined indicators for measuring the effectiveness of regional investment projects, but these figures are usually used only at the design stage of the project, an interim assessment of the effectiveness of a sufficiently simplified and based on the level of exploration investment.

  10. Automatic chemical monitoring in the composition of functions performed by the unit level control system in the new projects of nuclear power plant units

    Science.gov (United States)

    Denisova, L. G.; Khrennikov, N. N.

    2014-08-01

    The article presents information on the state of regulatory framework and development of a subsystem for automated chemical monitoring of water chemistries in the primary and secondary coolant circuits used as part of the automatic process control system in new projects of VVER reactor-based nuclear power plant units. For the strategy of developing and putting in use the water chemistry-related part of the automated process control system within the standard AES-2006 nuclear power plant project to be implemented, it is necessary to develop regulatory documents dealing with certain requirements imposed on automatic water chemistry monitoring systems in accordance with the requirements of federal codes and regulations in the field of using atomic energy.

  11. Bayesian-based Project Monitoring: Framework Development and Model Testing

    Directory of Open Access Journals (Sweden)

    Budi Hartono

    2015-12-01

    Full Text Available During project implementation, risk becomes an integral part of project monitoring. Therefore. a tool that could dynamically include elements of risk in project progress monitoring is needed. This objective of this study is to develop a general framework that addresses such a concern. The developed framework consists of three interrelated major building blocks, namely: Risk Register (RR, Bayesian Network (BN, and Project Time Networks (PTN for dynamic project monitoring. RR is used to list and to categorize identified project risks. PTN is utilized for modeling the relationship between project activities. BN is used to reflect the interdependence among risk factors and to bridge RR and PTN. A residential development project is chosen as a working example and the result shows that the proposed framework has been successfully applied. The specific model of the development project is also successfully developed and is used to monitor the project progress. It is shown in this study that the proposed BN-based model provides superior performance in terms of forecast accuracy compared to the extant models.

  12. Introduction to Meridian Space Weather Monitoring Project

    Institute of Scientific and Technical Information of China (English)

    WU Ji; WANG Chi; FAN Quanlin

    2006-01-01

    The Meridian Project is a ground- based network program to monitor solar-terrestrial space environment, which consists of a chain of ground-based observatories with multiple instruments including magnetometers, ionosondes, HF and VHF radar, Lidar, IPS monitors, sounding rockets etc. The chain is mainly located in the neighborhood of 120°E meridian, and is thus named the Meridian Project. It has officially been approved by the Chinese government and will be finished by 2009. This talk will give an overview of the Meridian Project and the proposed International Space Weather Meridian Circle Program.

  13. Project Monitoring and Control Measures In CMMI

    Directory of Open Access Journals (Sweden)

    Mahmoud Khraiwesh

    2013-10-01

    Full Text Available Project monitoring and control process is an important process in developing any computer informationsystem. Monitoring and Control provides an understanding of the project’s progress so that when theproject deviates significantly from the plan appropriate corrective actions can be taken. This research willidentify general measures for the specific goals and its specific practices of Project Monitoring andControl Process Area in Capability Maturity Model Integration (CMMI. CMMI is developed in USA bySoftware Engineering Institute (SEI in Carnegie Mellon University. CMMI is a framework for assessmentand improvement of computer information systems. The procedure we used to determine the measures is toapply the Goal Questions Metrics (GQM approach to the two specific goals and its ten specific practicesof Project Monitoring and Control Process Area in CMMI.

  14. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

  15. Performance Monitoring Techniques Supporting Cognitive Optical Networking

    DEFF Research Database (Denmark)

    Caballero Jambrina, Antonio; Borkowski, Robert; Zibar, Darko

    2013-01-01

    to solve this issue by realizing a network that can observe, act, learn and optimize its performance, taking into account end-to-end goals. In this letter we present the approach of cognition applied to heterogeneous optical networks developed in the framework of the EU project CHRON: Cognitive...... Heterogeneous Reconfigurable Optical Network. We focus on the approaches developed in the project for optical performance monitoring, which enable the feedback from the physical layer to the cognitive decision system by providing accurate description of the performance of the established lightpaths.......High degree of heterogeneity of future optical networks, such as services with different quality-of-transmission requirements, modulation formats and switching techniques, will pose a challenge for the control and optimization of different parameters. Incorporation of cognitive techniques can help...

  16. Shared performance monitor in a multiprocessor system

    Science.gov (United States)

    Chiu, George; Gara, Alan G; Salapura, Valentina

    2014-12-02

    A performance monitoring unit (PMU) and method for monitoring performance of events occurring in a multiprocessor system. The multiprocessor system comprises a plurality of processor devices units, each processor device for generating signals representing occurrences of events in the processor device, and, a single shared counter resource for performance monitoring. The performance monitor unit is shared by all processor cores in the multiprocessor system. The PMU is further programmed to monitor event signals issued from non-processor devices.

  17. Integrated Geophysical Monitoring Program to Study Flood Performance and Incidental CO2 Storage Associated with a CO2 EOR Project in the Bell Creek Oil Field

    Science.gov (United States)

    Burnison, S. A.; Ditty, P.; Gorecki, C. D.; Hamling, J. A.; Steadman, E. N.; Harju, J. A.

    2013-12-01

    The Plains CO2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center, is working with Denbury Onshore LLC to determine the effect of a large-scale injection of carbon dioxide (CO2) into a deep clastic reservoir for the purpose of simultaneous CO2 enhanced oil recovery (EOR) and to study incidental CO2 storage at the Bell Creek oil field located in southeastern Montana. This project will reduce CO2 emissions by more than 1 million tons a year while simultaneously recovering an anticipated 30 million barrels of incremental oil. The Bell Creek project provides a unique opportunity to use and evaluate a comprehensive suite of technologies for monitoring, verification, and accounting (MVA) of CO2 on a large-scale. The plan incorporates multiple geophysical technologies in the presence of complementary and sometimes overlapping data to create a comprehensive data set that will facilitate evaluation and comparison. The MVA plan has been divided into shallow and deep subsurface monitoring. The deep subsurface monitoring plan includes 4-D surface seismic, time-lapse 3-D vertical seismic profile (VSP) surveys incorporating a permanent borehole array, and baseline and subsequent carbon-oxygen logging and other well-based measurements. The goal is to track the movement of CO2 in the reservoir, evaluate the recovery/storage efficiency of the CO2 EOR program, identify fluid migration pathways, and determine the ultimate fate of injected CO2. CO2 injection at Bell Creek began in late May 2013. Prior to injection, a monitoring and characterization well near the field center was drilled and outfitted with a distributed temperature-monitoring system and three down-hole pressure gauges to provide continuous real-time data of the reservoir and overlying strata. The monitoring well allows on-demand access for time-lapse well-based measurements and borehole seismic instrumentation. A 50-level permanent borehole array of 3-component geophones was installed in a

  18. Performance Monitoring in Transparent Reconfigurable WDM Networks

    Institute of Scientific and Technical Information of China (English)

    Chun-Kit.Chan; Frank; Tong

    2003-01-01

    This paper classifies and surveys different approaches proposed for performance monitoring, in particular the optical signal-to-noise ratio (OSNR) monitoring, in transparent reconfigurable WDM networks. Some considerations for future monitoring schemes are discussed.

  19. Stream restoration and enhancement projects: is anyone monitoring?

    Science.gov (United States)

    Bash, Jeffrey S; Ryan, Clare M

    2002-06-01

    Declines in salmon stocks and general watershed health in Washington State, USA, have led to an increase in stream restoration and enhancement projects initiated throughout the state. The increasing number of projects has also raised questions regarding the monitoring of these efforts. Project managers receiving hydraulic project approvals (HPAs) were surveyed to determine whether monitoring was taking place on their projects. About half the project managers surveyed reported the collection of baseline data and the use of biological, physical, chemical, or other water quality measures for their projects. Of those who reported collection of monitoring data, only 18% indicated that monitoring was required. Respondents were also asked to rank the importance of various project goals on a Likert scale. Project managers with projects focusing on "engineering" goals (e.g., roadbed stabilization) were less likely than other project managers to collect baseline monitoring data. Project managers with projects focusing on "restoration/ecological" or "fisheries" goals were more likely than other project managers to collect monitoring measures. Although monitoring appears to be taking place in slightly more than half of the projects surveyed, the nature of the data collected varies widely across projects, and in most cases the monitoring effort is voluntary. This suggests that project sponsors, funders, and managers must consider the issues involved in requiring appropriate monitoring, establishing standardized monitoring guidelines, the time frames in which to monitor, providing other incentives for conducting monitoring, and ensuring adequate funding for monitoring efforts.

  20. Acoustic Monitoring for Spaceflight Vehicle Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR will develop and demonstrate acoustic sensor technology enabling real-time, remotely performed measuring and monitoring of sound pressure levels and noise...

  1. 基于项目理论的绩效评估监测制度设计%The Monitoring System Design of Performance Evaluation Based on the Project Theory

    Institute of Scientific and Technical Information of China (English)

    朱志凌

    2013-01-01

    This paper described the monitoring system framework of performance evaluation on government science and technology project. The framework consists of monitoring system and connotation both from three aspects of performance evaluation of target plan, performance reports and performance evaluation.%本文简要介绍了项目理论的相关内容和方法,并设计和阐述政府科技项目绩效评估监测制度框架,包括绩效目标计划、绩效报告和绩效评估三方面的监测制度及相关内涵。

  2. 36 CFR 1210.51 - Monitoring and reporting program performance.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Monitoring and reporting program performance. 1210.51 Section 1210.51 Parks, Forests, and Public Property NATIONAL ARCHIVES AND... managing and monitoring each project, program, subaward, function or activity supported by the...

  3. Gb-Sar Interferometry for Structure Monitoring during Infrastructure Projects

    Science.gov (United States)

    Serrano Juan, A.; Vázquez-Suñé, E.; Monserrat, O.; Crosetto, M.; Hoffman, C.; Ledesma, A.; Criollo, R.; Pujades, E.; Velasco, V.; García, A.

    2015-12-01

    Monitoring is a necessary task for infrastructure projects. Ground-based synthetic aperture radar (GB-SAR) has been used in a large variety of displacement measurements. However, it has not yet been applied as a monitoring tool during construction projects. This paper aims to demonstrate that GB-SAR can be very helpful for understanding the mechanisms that control structure deformations and for identifying unexpected events and sensitive areas during construction projects. This could be done in a cost-effective way, which complements the traditional displacement measurements. An experiment was performed in the future railway station of La Sagrera, Barcelona (Spain) to demonstrate the utility of GB-SAR on structure monitoring during construction projects. In this experiment, GB-SAR precisely quantified wall displacements induced by dewatering. Manual data and numerical models have been used to confirm the measurements with a correlation analysis and by comparing measurements and deformation patterns, which have produced similar results. These results validate the use of the GB-SAR technique as a monitoring tool during construction projects.

  4. Yakima/Klickitat Fisheries Project Monitoring and Evaluation, Final Report For the Performance Period May 1, 2008 through April 30, 2009.

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, Melvin R. [The Confederated Tribes and Bands of the Yakama Nation

    2009-07-30

    importance of proceeding with the YKFP because of the added production and learning potential the project would provide. The YKFP is unique in having been designed to rigorously test the efficacy of hatchery supplementation. Given the current dire situation of many salmon and steelhead stocks, and the heavy reliance on artificial propagation as a recovery tool, YKFP monitoring results will have great region-wide significance. Supplementation is envisioned as a means to enhance and sustain the abundance of wild and naturally-spawning populations at levels exceeding the cumulative mortality burden imposed on those populations by habitat degradation and by natural cycles in environmental conditions. A supplementation hatchery is properly operated as an adjunct to the natural production system in a watershed. By fully integrating the hatchery with a naturally-producing population, high survival rates for the component of the population in the hatchery can raise the average abundance of the total population (hatchery component + naturally-producing component) to a level that compensates for the high mortalities imposed by human development activities and fully seeds the natural environment. The objectives of the YKFP are to: use Ecosystem Diagnosis and Treatment (EDT) and other modeling tools to facilitate planning for project activities, enhance existing stocks, re-introduce extirpated stocks, protect and restore habitat in the Yakima Subbasin, and operate using a scientifically rigorous process that will foster application of the knowledge gained about hatchery supplementation and habitat restoration throughout the Columbia River Basin. The YKFP is still in the early stages of evaluation, and as such the data and findings presented in this report should be considered preliminary until results are published in the peer-reviewed literature. The following is a brief summary of current YKFP activities by species.

  5. 5 CFR 430.306 - Monitoring performance.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Monitoring performance. 430.306 Section 430.306 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.306 Monitoring performance. (a) Supervisors...

  6. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    Science.gov (United States)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  7. 40 CFR 35.2218 - Project performance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project performance. 35.2218 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2218 Project performance. (a... personnel; and (3) Advise the grantee whether the project is meeting the project performance standards....

  8. A Cryosphere Monitoring Project in the Himalayas

    Science.gov (United States)

    Stumm, D.; Mool, P. K.; Shresta, A. B.; Joshi, S. P.; Bajracharya, S. R.; Kayastha, R. B.; Devkota, L. P.; Bajracharya, O. R.

    2011-12-01

    The Cryosphere Monitoring Project (CMP) has been initiated by ICIMOD (International Centre for Integrated Mountain Development) with the aim to gain more knowledge about the cryosphere in the Himalayas and to build capacities in Nepalese organisations. The CMP is carried out in collaboration with the Kathmandu University, Tribhuvan University, the Department of Hydrology and Meteorology and the Water and Energy Commission Secretariat, and is sponsored by the Royal Norwegian Embassy. The CMP has a multilevel and integrative approach and consists of the following five components: (1) glacier monitoring, (2) assessment of current and future water resources at catchment and sub-basin scale, (3) multi-level remote sensing based observations for glacier and snow monitoring, (4) strengthening ICIMOD as regional knowledge hub for cryospheric information, (5) capacity building of Nepalese organisations. The glacier monitoring component includes field-based mass balance, geometry and glacier flow measurements on two clean and one debris-covered glacier and their analysis, as well as snow cover measurements. The in-situ glacier measurements promote process understanding, provide a refined temporal resolution of mass balance data and data for calibration of glacio-hydrological models. To assess current water resources, meteorological and hydrological measurements are initiated and the run-off is calculated with glacio-hydrological and snow-melt models for the catchments of the selected glaciers. Future water availability will be assessed by down-scaling regional climate model (RCM) data that is applied to the glacio-hydrological model. Remote sensing data is used to improve spatial information about the glacier distribution by refining glacier inventories, and to calculate the geodetic mass balance for the selected glaciers to complement the directly measured glacier mass balance. Additionally, the operation of a MODIS satellite receiving station is planned to obtain near real

  9. Monitoring the performance of incident management teams

    National Research Council Canada - National Science Library

    Conway, Geoff

    2016-01-01

    The Real Time Performance Monitoring Program operating in Victoria - tool available to agency leaders to understand the performance of their incident managers based on the context in which incident...

  10. Relationship between the IT projects performance and project management maturity

    Directory of Open Access Journals (Sweden)

    Renato de Oliveira Moraes

    2013-03-01

    Full Text Available This paper presents a study on the relationship between performance of IT projects and the project management maturity of performing organization. The research was conducted through a survey with 185 respondents during the year 2010. The project performance was evaluated through the first two dimensions Shenhar et al (2001 - project efficiency and customer impact. The maturity of project management was assessed by the level of formalization of procedures for project management described in PMBoK. The data were analyzed using statistical procedures (factor analysis, Cronbach's alpha, cluster analysis and bivariate analysis and revealed that (i that organizations with higher maturity have a superior performance in their projects, and (ii different dimensions of maturity has different impacts on the performance of IT projects.

  11. Gulliver project: performers and visitors

    NARCIS (Netherlands)

    Nijholt, Antinus; Hemsley, J.; Cappellini, V.; Stanke, G.

    2005-01-01

    This paper discusses two projects in our research environment. The Gulliver project, an ambitious project conceived by some artists connected to our research efforts, and the Aveiro-project, as well ambitious, but with goals that can be achieved beause of technological developments, rather than be

  12. Water-Level Monitoring Plan for the Hanford Groundwater Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    D.R. Newcomer; J.P. McDonald; M.A. Chamness

    1999-09-30

    This document presents the water-level monitoring plan for the Hanford Groundwater Monitoring Project, conducted by the Pacific Northwest National Laboratory (PNNL). Water-level monitoring of the groundwater system beneath the Hanford Site is performed to fulfill the requirements of various state and federal regulations, orders, and agreements. The primary objective of this monitoring is to determine groundwater flow rates and directions. To meet this and other objectives, water-levels are measured annually in monitoring wells completed within the unconfined aquifer system, the upper basalt-confined aquifer system, and in the lower basalt-confined aquifers for surveillance monitoring. At regulated waste units, water levels are taken monthly, quarterly, semi-annually, or annually, depending on the hydrogeologic conditions and regulatory status of a given site. The techniques used to collect water-level data are described in this document along with the factors that affect the quality of the data and the strategies employed by the project to minimize error in the measurement and interpretation of water levels. Well networks are presented for monitoring the unconfined aquifer system, the upper basalt-confined aquifer system, and the lower basalt-confined aquifers, all at a regional scale (surveillance monitoring), as well as the local-scale well networks for each of the regulated waste units studied by this project (regulated-unit monitoring). The criteria used to select wells for water-table monitoring are discussed. It is observed that poor well coverage for surveillance water-table monitoring exists south and west of the 200-West Area, south of the 100-F Area, and east of B Pond and the Treated Effluent Disposal Facility (TEDF). This poor coverage results from a lack of wells suitable for water-table monitoring, and causes uncertainty in representation of the regional water-table in these areas. These deficiencies are regional in scale and apply to regions outside

  13. Biomedical Monitoring By A Novel Noncontact Radio Frequency Technology Project

    Science.gov (United States)

    Oliva-Buisson, Yvette J. (Compiler)

    2014-01-01

    The area of Space Health and Medicine is one of the NASA's Space Technology Grand Challenges. Space is an extreme environment which is not conducive to human life. The extraterrestrial environment can result in the deconditioning of various human physiological systems and thus require easy to use physiological monitoring technologies in order to better monitor space crews for appropriate health management and successful space missions and space operations. Furthermore, the Space Technology Roadmap's Technology Area Breakdown Structure calls for improvements in research to support human health and performance (Technology Area 06). To address these needs, this project investigated a potential noncontact and noninvasive radio frequency-based technique of monitoring central hemodynamic function in human research subjects in response to orthostatic stress.

  14. Performance Monitoring Applied to System Supervision

    Directory of Open Access Journals (Sweden)

    Bertille Somon

    2017-07-01

    Full Text Available Nowadays, automation is present in every aspect of our daily life and has some benefits. Nonetheless, empirical data suggest that traditional automation has many negative performance and safety consequences as it changed task performers into task supervisors. In this context, we propose to use recent insights into the anatomical and neurophysiological substrates of action monitoring in humans, to help further characterize performance monitoring during system supervision. Error monitoring is critical for humans to learn from the consequences of their actions. A wide variety of studies have shown that the error monitoring system is involved not only in our own errors, but also in the errors of others. We hypothesize that the neurobiological correlates of the self-performance monitoring activity can be applied to system supervision. At a larger scale, a better understanding of system supervision may allow its negative effects to be anticipated or even countered. This review is divided into three main parts. First, we assess the neurophysiological correlates of self-performance monitoring and their characteristics during error execution. Then, we extend these results to include performance monitoring and error observation of others or of systems. Finally, we provide further directions in the study of system supervision and assess the limits preventing us from studying a well-known phenomenon: the Out-Of-the-Loop (OOL performance problem.

  15. Three-Dimensional Health Monitoring of Sandwich Composites Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR project delivers a single-chip structural health-monitoring (SHM) system that uses the impedance method to monitor bulk interiors and wave propagation...

  16. Gulliver Project: Performers and Visitors

    NARCIS (Netherlands)

    Nijholt, Antinus; Cappellini, V.; Hemsley, J.; Stanke, G.

    2002-01-01

    This paper discusses two projects in our research environment. The Gulliverproject, an ambitious project conceived by some artists connected to our research efforts, and the Aveiro-project, as well ambitious, but with goals that can be achieved beause of technological developments, rather than be

  17. Project materials [Commercial High Performance Buildings Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-01-01

    The Consortium for High Performance Buildings (ChiPB) is an outgrowth of DOE'S Commercial Whole Buildings Roadmapping initiatives. It is a team-driven public/private partnership that seeks to enable and demonstrate the benefit of buildings that are designed, built and operated to be energy efficient, environmentally sustainable, superior quality, and cost effective.

  18. Monitoring and evaluation of sustained clinical performance and tuberculosis management in the South African mining industry

    CSIR Research Space (South Africa)

    Murray

    2004-03-01

    Full Text Available Advisory Committee Project Summary : SIM 02-08-02 Project Title: MONITORING AND EVALUATION OF SUSTAINED CLINICAL PERFORMANCE AND TUBERCULOSIS MANAGEMENT IN THE SA MINING INDUSTRY (22 pages) Author(s): Dr Jill Murray Dr Michelle Wong...

  19. Project Design Concept for Monitoring and Control System

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-10-02

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations.

  20. Ion Mobility Spectrometry for Water Monitoring Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Current water quality monitors aboard the International Space Station (ISS) are specialized and provide limited data. The Colorimetric Water Quality Monitor Kit...

  1. TPS In-Flight Health Monitoring Project Progress Report

    Science.gov (United States)

    Kostyk, Chris; Richards, Lance; Hudston, Larry; Prosser, William

    2007-01-01

    Progress in the development of new thermal protection systems (TPS) is reported. New approaches use embedded lightweight, sensitive, fiber optic strain and temperature sensors within the TPS. Goals of the program are to develop and demonstrate a prototype TPS health monitoring system, develop a thermal-based damage detection algorithm, characterize limits of sensor/system performance, and develop ea methodology transferable to new designs of TPS health monitoring systems. Tasks completed during the project helped establish confidence in understanding of both test setup and the model and validated system/sensor performance in a simple TPS structure. Other progress included complete initial system testing, commencement of the algorithm development effort, generation of a damaged thermal response characteristics database, initial development of a test plan for integration testing of proven FBG sensors in simple TPS structure, and development of partnerships to apply the technology.

  2. 5 CFR 430.207 - Monitoring performance.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Monitoring performance. 430.207 Section 430.207 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Performance Appraisal for General Schedule, Prevailing Rate, and Certain Other Employees §...

  3. Metacognitive monitoring and strategic behaviour in working memory performance.

    Science.gov (United States)

    Touron, Dayna R; Oransky, Natalie; Meier, Matthew E; Hines, Jarrod C

    2010-08-01

    Research indicates that cognitive age differences can be influenced by metacognitive factors. This research has generally focused on simple memory tasks. Age differences in working memory (WM) performance are pronounced, but are typically attributed to basic cognitive deficits rather than metacognitive factors. However, WM performance can be influenced by strategic behaviour that might be driven by metacognitive monitoring. In the current project, we attempted to connect these lines of research by examining age differences in metacognitive WM monitoring and strategies. In Experiment 1, younger and older adult participants completed a computerized operation span task in conditions that either required or did not require monitoring reports. Participants in the monitoring condition predicted and postdicted global performance for each block and rated their responses following each trial within a block. In Experiment 2, participants also reported their trial-level strategic approach. In contrast to the age equivalence typically found for simple memory monitoring, results demonstrated age differences in WM monitoring accuracy. Overall age differences in strategy use were not found, but using effective strategies benefited older adults' performance more than younger adults'. Furthermore, age-related differences in the WM task appear to be mediated by the accuracy of performance monitoring.

  4. Performance Health Monitoring of Large-Scale Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rajamony, Ram [IBM Research, Austin, TX (United States)

    2014-11-20

    This report details the progress made on the ASCR funded project Performance Health Monitoring for Large Scale Systems. A large-­scale application may not achieve its full performance potential due to degraded performance of even a single subsystem. Detecting performance faults, isolating them, and taking remedial action is critical for the scale of systems on the horizon. PHM aims to develop techniques and tools that can be used to identify and mitigate such performance problems. We accomplish this through two main aspects. The PHM framework encompasses diagnostics, system monitoring, fault isolation, and performance evaluation capabilities that indicates when a performance fault has been detected, either due to an anomaly present in the system itself or due to contention for shared resources between concurrently executing jobs. Software components called the PHM Control system then build upon the capabilities provided by the PHM framework to mitigate degradation caused by performance problems.

  5. Browns Park National Wildlife Refuge monitoring projects

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This project report summarizes the projects conducted at BPNWR between 2005- 2010. At the end of this report is a list of all of the project deliverables. These...

  6. Instrument Performance Monitoring at Gemini North

    Science.gov (United States)

    Emig, Kimberly; Pohlen, M.; Chene, A.

    2014-01-01

    An instrument performance monitoring (IPM) project at the Gemini North Observatory evaluates the delivered throughput and sensitivity of, among other instruments, the Near-Infrared Integral Field Spectrometer (NIFS), the Gemini Near-Infrared Spectrograph (GNIRS), and the Gemini Multi-Object Spectrograph (GMOS-N). Systematic observations of standard stars allow the quality of the instruments and mirror to be assessed periodically. An automated pipeline has been implemented to process and analyze data obtained with NIFS, GNIRS cross-dispersed (XD) and long slit (LS) modes, and GMOS (photometry and spectroscopy). We focus the discussion of this poster on NIFS and GNIRS. We present the spectroscopic throughput determined for ZJHK bands on NIFS, the XJHKLM band for GNIRS XD mode and the K band for GNIRS LS. Additionally, the sensitivity is available for the JHK bands in NIFS and GNIRS XD, and for the K band in GNIRS LS. We consider data taken as early as March 2011. Furthermore, the pipeline setup and the methods used to determine throughput and sensitivity are described.

  7. 28 CFR 512.17 - Monitoring approved research projects.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Monitoring approved research projects. 512.17 Section 512.17 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.17 Monitoring approved research projects. The...

  8. Plan for Demonstration of Online Monitoring for the Light Water Reactor Sustainability Online Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Magdy S. Tawfik; Vivek Agarwal; Nancy J. Lybeck

    2011-09-01

    Condition based online monitoring technologies and development of diagnostic and prognostic methodologies have drawn tremendous interest in the nuclear industry. It has become important to identify and resolve problems with structures, systems, and components (SSCs) to ensure plant safety, efficiency, and immunity to accidents in the aging fleet of reactors. The Machine Condition Monitoring (MCM) test bed at INL will be used to demonstrate the effectiveness to advancement in online monitoring, sensors, diagnostic and prognostic technologies on a pilot-scale plant that mimics the hydraulics of a nuclear plant. As part of this research project, INL will research available prognostics architectures and their suitability for deployment in a nuclear power plant. In addition, INL will provide recommendation to improve the existing diagnostic and prognostic architectures based on the experimental analysis performed on the MCM test bed.

  9. 44 CFR 206.204 - Project performance.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project performance. 206.204... § 206.204 Project performance. (a) General. This section describes the policies and procedures applicable during the performance of eligible work. (b) Advances of funds. Advances of funds will be made...

  10. FY 2002 Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

    2001-10-31

    This document is an integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders ("surveillance monitoring"); other, established monitoring plans by reference; and a master well/ constituent/frequency matrix for the entire Hanford Site.

  11. Monitoring in educational development projects : the development of a monitoring system

    NARCIS (Netherlands)

    Plomp, Tjeerd; Huijsman, Hari; Kluyfhout, Eric

    1992-01-01

    Monitoring in education is usually focused on the monitoring of educational systems at different levels. Monitoring of educational projects receives only recently explicit attention. The paper discusses first the concepts of educational monitoring and evaluation. After that, the experience with deve

  12. JPMT: A Java Performance Monitoring Tool

    NARCIS (Netherlands)

    Harkema, M.; Quartel, Dick; van der Mei, Robert; Gijsen, Bart

    This paper describes our Java Performance Monitoring Toolkit (JPMT), which is developed for detailed analysis of the behavior and performance of Java applications. JPMT represents internal execution behavior of Java applications by event traces, where each event represents the occurrence of some

  13. Performance, requirements and testing in individual monitoring

    DEFF Research Database (Denmark)

    Julius, H.W.; Christensen, P.; Marshall, T.O.

    1990-01-01

    monitoring, and in particular of those related to the energy and angular dependences of the dosemeters. These data are important for the testing of the dosimetry systems. Finally testing programmes in individual monitoring are discussed and four categories of testing are proposed.......For implementation of the ICRP requirements in practical routine monitoring, a specification is needed with respect to specific performance criteria of the dosimetry system. This includes the dosemeters, and procedures for initial and on-going testing of the dosimetry systems to ensure...... that the specified criteria are continuously met. Methods are here specified for establishing performance criteria, and satisfying the ICRP overall accuracy requirements for individual monitoring. Furthermore, procedures are given for obtaining numerical values of the uncertainties connected with individual...

  14. Prioritizing Project Performance Criteria within Client Perspective

    Directory of Open Access Journals (Sweden)

    Arazi Idrus

    2011-10-01

    Full Text Available Successful performance in a construction project helps to deliver good products to the client. At present, there is no standard approach used by clients to evaluate project performance as project success carries different definitions to different people. Some used the traditional project performance measures of cost, quality and time while others used additional non-traditional measures such as the environment, health and safety, level of technology and contractor planning. The purpose of this study is to identify and rank the actual criteria used by local clients in current practice to measure the performance of a construction project during construction as well as upon completion. The ranking is based on the relative importance of the criteria as perceived by project performance decision makers working for clients’ organizations within the Malaysian construction industry using their accumulated experience and judgment. The objective of this study was investigated through a postal questionnaire which covered a selected sample of the study. Data were analyzed using mean, variance, frequency and severity index analyses. The results of this paper show that Quality of finished project, Construction cost and Construction time were the three most important criteria considered crucial by the respondents for evaluating project performance from current practice in Malaysia. The paper provides supportive practical solution for project performance decision makers working for clients’ organizations within the Malaysian construction industry to enhance and improve their practices in measuring their clients’ project performance so that their clients would enjoy higher satisfaction levels from their projects. More so, the paper would serve as a guide to contractors by helping them to understand that Quality of finished project, Construction cost and Construction time are the criteria given high priority by clients in measuring the performance of a

  15. Tools for Monitoring Social Media: A Marketing Research Project

    Science.gov (United States)

    Veeck, Ann; Hoger, Beth

    2014-01-01

    Knowledge of how to effectively monitor social media is an increasingly valued marketing research skill. This study tests an approach for adding social media content to an undergraduate marketing research class team project. The revised project maintains the expected objectives and parameters of a traditional research project, while integrating…

  16. Tools for Monitoring Social Media: A Marketing Research Project

    Science.gov (United States)

    Veeck, Ann; Hoger, Beth

    2014-01-01

    Knowledge of how to effectively monitor social media is an increasingly valued marketing research skill. This study tests an approach for adding social media content to an undergraduate marketing research class team project. The revised project maintains the expected objectives and parameters of a traditional research project, while integrating…

  17. WiMAX network performance monitoring & optimization

    DEFF Research Database (Denmark)

    Zhang, Qi; Dam, H

    2008-01-01

    frequency reuse, capacity planning, proper network dimensioning, multi-class data services and so on. Furthermore, as a small operator we also want to reduce the demand for sophisticated technicians and man labour hours. To meet these critical demands, we design a generic integrated network performance......In this paper we present our WiMAX (worldwide interoperability for microwave access) network performance monitoring and optimization solution. As a new and small WiMAX network operator, there are many demanding issues that we have to deal with, such as limited available frequency resource, tight...... this integrated network performance monitoring and optimization system in our WiMAX networks. This integrated monitoring and optimization system has such good flexibility and scalability that individual function component can be used by other operators with special needs and more advanced function components can...

  18. Managing Performance Analysis with Dynamic Statistical Projection Pursuit

    Energy Technology Data Exchange (ETDEWEB)

    Vetter, J.S.; Reed, D.A.

    2000-05-22

    Computer systems and applications are growing more complex. Consequently, performance analysis has become more difficult due to the complex, transient interrelationships among runtime components. To diagnose these types of performance issues, developers must use detailed instrumentation to capture a large number of performance metrics. Unfortunately, this instrumentation may actually influence the performance analysis, leading the developer to an ambiguous conclusion. In this paper, we introduce a technique for focusing a performance analysis on interesting performance metrics. This technique, called dynamic statistical projection pursuit, identifies interesting performance metrics that the monitoring system should capture across some number of processors. By reducing the number of performance metrics, projection pursuit can limit the impact of instrumentation on the performance of the target system and can reduce the volume of performance data.

  19. Evolutionary Autonomous Health Monitoring System (EAHMS) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — For supporting NASA's Robotics, Tele-Robotics and Autonomous Systems Roadmap, we are proposing the "Evolutionary Autonomous Health Monitoring System" (EAHMS) for...

  20. Electronic Health Monitoring for Space Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Prognostic monitoring capabilities for space exploration aircrafts are crucial to enable safety and reliability in these platforms. Nokomis proposes to develop and...

  1. Design, Monitoring, and Validation of a High Performance Sustainable Building

    Science.gov (United States)

    2013-08-01

    system Rainwater collected by roof and drains to the 10,000 gallon cistern below grade Not applicable Sewage conveyance Rainwater Potable water...rating system was used as the baseline for the whole building design objectives. Monitoring data for energy and water use were collected at the...performance metrics that address the research needs and sustainable design goals of the project b. establish data collection system that allows for data

  2. The Sloan Digital Sky Survey Telescope Performance Monitor

    Science.gov (United States)

    McGehee, Peregrine M.; Brinkmann, Jon; Rockosi, Constance M.; Long, Dan; Snedden, Stephanie A.; Kleinman, S. J.; Nitta, Atsuko; Harvanek, Michael; Newman, Peter R.; Neilsen, Eric H., Jr.; Krzesinski, Jurek

    2002-12-01

    The Telescope Performance Monitor (TPM) installed at the Sloan Digital Sky Survey (SDSS) located at Apache Point Observatory provides access to real-time and archived engineering data. The modularity present in the underlying Experimental Physics and Industrial Control System (EPICS) toolkit allows the observers and operations staff to develop their own approaches to data access and analysis. These techniques are summarized and the use of the TPM to solve critical project issues including analysis and correction of thermal management problems are presented.

  3. Macro and micro determinants of project performance

    Directory of Open Access Journals (Sweden)

    Yemesrach Assefa

    2014-12-01

    Full Text Available One year from the target date of the achievement of the Millennium Development Goals (MDGs, the result in Africa is only a work in progress. Africa has made progress towards some of the MDGs but needs to draw lessons and improve performance post 2015. This study investigates the development effectiveness of the African Development Bank Group-financed projects using 229 concluded projects between 2004 and 2012 to assess the major determinants of project performance. The study finds that the Bank Group has on average a high level of development effectiveness. Using econometric analysis the study found that country-level variables’ interactions with project-level variables explain a substantial share of the variationsin project performance. In particular, it affirmed that country policies and institutions and country capacity in general is positively correlated with project performance whilst parallel project implementation units were not correlated. At the micro level, the age of a project, the quality of project design and the choice of programing instrument were also important determinants of project success. The findings of this study therefore will inform the policy formulation processes in the post 2015 agenda.

  4. Developing an Integrated Monitoring and Evaluation Flow for Sustainable Investment Projects

    Directory of Open Access Journals (Sweden)

    Florin TACHE

    2011-12-01

    Full Text Available Under the circumstances of certain weaknesses in the monitoring and evaluation processes of sustainable investment projects, the paper aims to develop a general integrated flow, encompassing both a project monitoring system and also a project evaluation system for the investment projects involving economic objectives, as well as cross-cutting social and environmental targets. The whole approach is being presented as a flowchart, which highlights the intimate relationship between the monitoring and evaluation processes, and provides a formal framework for performing a logical monitoring and evaluation process, taking into account simultaneously the economic, social and environmental perspectives, within an investment project. Last, but not least, the article states both the estimated advantages and the disadvantages of such a managerial tool, opening new perspectives for developing further improved models and systems.

  5. The Relationships between Monitoring, Regulation and Performance

    Science.gov (United States)

    Koriat, Asher

    2012-01-01

    The articles in this Special Issue reflect the growing interest in applying laboratory-based research to educational settings. These articles highlight the contribution of metacognitive monitoring and self-regulation to effective learning and performance. At the same time, they illustrate the methodological and theoretical challenges involved in…

  6. ERP Correlates of Performance Monitoring in Elderly

    Science.gov (United States)

    Schreiber, Melanie; Pietschmann, Maria; Kathmann, Norbert; Endrass, Tanja

    2011-01-01

    Previous studies on performance monitoring repeatedly found attenuated error-related negativities (Ne/ERN) in elderly, while findings for the correct-related negativity (Nc/CRN) are inconsistent. The present study aimed at clarifying inconsistent Nc/CRN results in elderly. Therefore, a refined design was employed to control for potential…

  7. Resilient Plant Monitoring System: Design, Analysis, and Performance Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Humberto E. Garcia; Wen-Chiao Lin; Semyon M. Meerkov; Maruthi T. Ravichandran

    2013-12-01

    Resilient monitoring systems are sensor networks that degrade gracefully under malicious attacks on their sensors, causing them to project misleading information. The goal of this paper is to design, analyze, and evaluate the performance of a resilient monitoring system intended to monitor plant conditions (normal or anomalous). The architecture developed consists of four layers: data quality assessment, process variable assessment, plant condition assessment, and sensor network adaptation. Each of these layers is analyzed by either analytical or numerical tools, and the performance of the overall system is evaluated using simulations. The measure of resiliency of the resulting system is evaluated using Kullback Leibler divergence, and is shown to be sufficiently high in all scenarios considered.

  8. Performance Metrics Research Project - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Deru, M.; Torcellini, P.

    2005-10-01

    NREL began work for DOE on this project to standardize the measurement and characterization of building energy performance. NREL's primary research objectives were to determine which performance metrics have greatest value for determining energy performance and to develop standard definitions and methods of measuring and reporting that performance.

  9. Environmental Monitoring - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Davy, Thomas (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    The purpose of this report is to describe the environmental monitoring measures performed for the Lillgrund Offshore Wind Farm and to summarize the results and conclusions. Construction work started in 2006 and the plant was energized in December 2007. At the time of construction Lillgrund was the third largest wind farm offshore in the world and the first large offshore wind farm in Sweden. The purpose of the environmental monitoring is to ensure that there are no negative impacts on the environment stemming from construction of the Lillgrund wind farm as well as to ensure that the conditions stated by the authorities and the Company's commitments are met. The aim is also to collect more information and knowledge on the possible environmental impact for future offshore wind farm projects. For the Lillgrund project, all monitoring programs were included in one document, Monitoring Program - Lillgrund. It was included as part of the procedures to ensure that the Swedish legal requirements on operators control were followed. The authorities approved the document before construction started. The monitoring measures performed during the construction phase included: - A feedback and monitoring program on dredging and spillage; - A feedback and monitoring program on flora and fauna; - Studies and inspections of the refilling and re-establishment of the sea bottom; - Procedure for operators control. The mean measured sediment spillage, as part of the monitoring program on dredging and spillage, varied between 4.6 - 4.8% depending on dredger used. The maximum value allowed by the conditions is 5%. In general, the calculated values for suspended material were limited and the critical value of 0.01 kg/m3 was exceeded only in minor areas for a very limited time. No corrective actions were required. The deposition of sediment was very low and even at the most effected sites it was only just over 1 mm. The largest dredging volumes were for the foundation work, in total 82

  10. Compact, High Accuracy CO2 Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovative Research Phase II proposal seeks to develop a low cost, robust, highly precise and accurate CO2 monitoring system. This system will...

  11. Differential Photoacoustic Particle Absorption Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to develop a highly sensitive and compact monitor to measure light absorption from particulate matters. The fundamental of the proposed device is based on...

  12. Three Color Particle Optical Extinction Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to design, build and test a multi-color (red, green, blue) particle optical extinction monitor suitable for use in either land or airborne applications....

  13. Compact, High Accuracy CO2 Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovative Research Phase I proposal seeks to develop a low cost, robust, highly precise and accurate CO2 monitoring system. This system will...

  14. Community air monitoring and Village Green Project

    Science.gov (United States)

    Cost and logistics are practical issues that have historically constrained the number of locations where long-term, active air pollution measurement is possible. In addition, traditional air monitoring approaches are generally conducted by technical experts with limited engageme...

  15. Dynamic Strain and Crack Monitoring Sensor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The development of condition-based monitoring sensor network systems has the potential to provide an enhanced aircraft safety by real time assessment of the...

  16. Dynamic Strain and Crack Monitoring Sensor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Los Gatos Research proposes to develop a new automated vehicle health monitoring sensor system capable of measuring loads and detecting crack, corrosion, and...

  17. High Performance Space Pump Project

    Data.gov (United States)

    National Aeronautics and Space Administration — PDT is proposing a High Performance Space Pump based upon an innovative design using several technologies. The design will use a two-stage impeller, high temperature...

  18. South Bay Salt Pond Restoration Project : Phase 1 monitoring plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This SBSP Restoration Project Monitoring Plan provides methods to document the effect of restoration on important elements such as mercury uptake, and water and...

  19. Metro Multnomah Wetlands - Multnomah Channel Wetland Restoration Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Multnomah Channel Wetland Restoration Monitoring Project characterizes wetlands use by juvenile salmonids and other fishes in the Multnomah Channel Marsh Natural...

  20. Skagit IMW - Skagit River Estuary Intensively Monitored Watershed Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study evaluates system-level effects of several estuary restoration projects on juvenile Chinook salmon production in the Skagit River estuary. The monitoring...

  1. Crucial Component Damage Detection, Monitoring and Mitigation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR project delivers an on-board structural health-monitoring (SHM) system with embedded sensors that sense mechanical impedance deviations to flag incipient...

  2. Composite Structure Monitoring using Direct Write Sensors Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This NASA SBIR Phase II project seeks to develop and demonstrate a suite of sensor products to monitor the health of composite structures. Sensors will be made using...

  3. Walnut Creek Watershed Restoration and Water Quality Monitoring Project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The primary objective of this project is to establish a nonpoint source monitoring program in relation to the watershed habitat restoration and agricultural...

  4. AFSC/ABL: Southeast Coastal Monitoring Project - CTD database

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Southeast Alaska Coastal Monitoring (SECM) project in Alaska was initiated in 1997 by the Auke Bay Laboratory, National Marine Fisheries Service, to study the...

  5. Welcome to the Walnut Creek Nonbreeding Bird Monitoring Project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is a summary of the bird monitoring project at Walnut Creek National Wildlife Refuge (Neal Smith National Wildlife Refuge). The refuge is divided into 28...

  6. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans.

  7. Back Bay Stormwater Monitoring Project Final Report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objective of this project was to assess the influx of nutrients and solid material into Back Bay and its tributaries during and immediately following such storm...

  8. The Use of Project Time Management Processes and the Schedule Performance of Construction Projects in Mexico

    Directory of Open Access Journals (Sweden)

    Rómel G. Solís-Carcaño

    2015-01-01

    Full Text Available Delays have been frequently reported as the cause of several conflicts that affect the different parties involved in construction projects. Project Time Management (PTM includes a number of planning and controlling processes that are recommended for complying with requirements related to project time. The study reported in this paper aimed at assessing the use of PTM processes and its relation with project schedule performance (i.e., timely completion. Seven PTM processes and seventy-seven tasks associated with them were identified from the literature that is globally relevant to project management. The study included the assessment of fourteen school construction projects executed by a public agency in the Yucatan Peninsula, Mexico. These projects were monitored during the construction phase in order to measure two different variables: the use of processes related to PTM (i.e., schedule planning and controlling processes and the project schedule performance. For each of these projects a Use Index was obtained for assessing the first variable, while the Schedule Performance Index and the Schedule Variance were computed to assess the second one. The results demonstrated there is statistical dependence between these two variables. Most of the projects that attained timely completion also made a greater use of the PTM processes.

  9. Environmental Monitoring - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Davy, Thomas (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    The purpose of this report is to describe the environmental monitoring measures performed for the Lillgrund Offshore Wind Farm and to summarize the results and conclusions. Construction work started in 2006 and the plant was energized in December 2007. At the time of construction Lillgrund was the third largest wind farm offshore in the world and the first large offshore wind farm in Sweden. The purpose of the environmental monitoring is to ensure that there are no negative impacts on the environment stemming from construction of the Lillgrund wind farm as well as to ensure that the conditions stated by the authorities and the Company's commitments are met. The aim is also to collect more information and knowledge on the possible environmental impact for future offshore wind farm projects. For the Lillgrund project, all monitoring programs were included in one document, Monitoring Program - Lillgrund. It was included as part of the procedures to ensure that the Swedish legal requirements on operators control were followed. The authorities approved the document before construction started. The monitoring measures performed during the construction phase included: - A feedback and monitoring program on dredging and spillage; - A feedback and monitoring program on flora and fauna; - Studies and inspections of the refilling and re-establishment of the sea bottom; - Procedure for operators control. The mean measured sediment spillage, as part of the monitoring program on dredging and spillage, varied between 4.6 - 4.8% depending on dredger used. The maximum value allowed by the conditions is 5%. In general, the calculated values for suspended material were limited and the critical value of 0.01 kg/m3 was exceeded only in minor areas for a very limited time. No corrective actions were required. The deposition of sediment was very low and even at the most effected sites it was only just over 1 mm. The largest dredging volumes were for the foundation work, in total 82

  10. Advanced Performance Modeling with Combined Passive and Active Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Dovrolis, Constantine [Georgia Inst. of Technology, Atlanta, GA (United States); Sim, Alex [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-04-15

    To improve the efficiency of resource utilization and scheduling of scientific data transfers on high-speed networks, the "Advanced Performance Modeling with combined passive and active monitoring" (APM) project investigates and models a general-purpose, reusable and expandable network performance estimation framework. The predictive estimation model and the framework will be helpful in optimizing the performance and utilization of networks as well as sharing resources with predictable performance for scientific collaborations, especially in data intensive applications. Our prediction model utilizes historical network performance information from various network activity logs as well as live streaming measurements from network peering devices. Historical network performance information is used without putting extra load on the resources by active measurement collection. Performance measurements collected by active probing is used judiciously for improving the accuracy of predictions.

  11. Performance Assessment and Active System Monitoring for Refrigeration Systems

    DEFF Research Database (Denmark)

    Green, Torben

    for algorithms that ensures or improves the performance of the system. A supermarket refrigeration system is usually a complex and distributed control system, and it can therefore be difficult to assess the performance without a formal method. The main interest for a supermarket, with respect...... of the refrigeration system has been addressed in the project. The proposed methods for improvement relies on a minimum of detailed knowledge about the refrigeration system. In addition, since a refrigeration system often operates in steady state an active system monitoring setup has been proposed, to enable...... a method for assessing the operational performance at a plan-wide level and is therefore providing a tool for improving the plant-wide performance. The performance function has been used in dierent setups to improve the performance of the refrigeration system. Static and the dynamic performance...

  12. STRATEGY AND PLANNING - PROJECT FOR MONITORING STRICTO SENSU POSTGRADUATE ALUMNI

    Directory of Open Access Journals (Sweden)

    Emerson Antonio Maccari

    2014-07-01

    Full Text Available The Coordination of Improvement of Higher Education Personnel (CAPES has been contributing to the development of post-graduate studies in Brazil, through its system of evaluation. Lately, CAPES signaled the importance of follow the professional performance of the alumni as a way to measure the quality of courses. One difficulty reported by institutions that intend to recognize the trajectory of its graduates is to compile a lot of isolated and outdated data. In order to structure the data collection and to assist educational managers in decision making, we propose the development of a system that enables the evolution of the students and alumni professional career, in order to diagnose the influence of the courses. Based on literature review, this study presents an analysis and makes recommendations about the Monitoring Alumni Project planning. As a result, it is expected that the analysis will serve as a driver for conducting the project, aiming to contribute to the academic reflections, and in practice, contribute to improve educational projects quality.

  13. PERMEABLE TREATMENT WALL EFFECTIVENESS MONITORING PROJECT, NEVADA STEWART MINE

    Science.gov (United States)

    This report summarizes the results of Mine Waste Technology Program (MWTP) Activity III, Project 39, Permeable Treatment Wall Effectiveness Monitoring Project, implemented and funded by the U.S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U.S. De...

  14. Monitoring Completed Coastal Projects - Lessons Learned I

    Science.gov (United States)

    1992-06-01

    breakwater at Spud Point Marina, Bodega Harbor, CA was monitored. Lessons learned are: 35. Small transmitted wave heights, even on the order of a few inches...July 1988. Lott, J. W., ’Spud Point Marina Breakwater, California,’ Bodega Bay, Sonoma County, MP CERC-91-5, US Army Engineer Waterways 1991

  15. Monitoring SLAC High Performance UNIX Computing Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lettsome, Annette K.; /Bethune-Cookman Coll. /SLAC

    2005-12-15

    Knowledge of the effectiveness and efficiency of computers is important when working with high performance systems. The monitoring of such systems is advantageous in order to foresee possible misfortunes or system failures. Ganglia is a software system designed for high performance computing systems to retrieve specific monitoring information. An alternative storage facility for Ganglia's collected data is needed since its default storage system, the round-robin database (RRD), struggles with data integrity. The creation of a script-driven MySQL database solves this dilemma. This paper describes the process took in the creation and implementation of the MySQL database for use by Ganglia. Comparisons between data storage by both databases are made using gnuplot and Ganglia's real-time graphical user interface.

  16. Preliminary Analysis of Remote Monitoring & Robotic Concepts for Performance Confirmation

    Energy Technology Data Exchange (ETDEWEB)

    D.A. McAffee

    1997-02-18

    As defined in 10 CFR Part 60.2, Performance Confirmation is the ''program of tests, experiments and analyses which is conducted to evaluate the accuracy and adequacy of the information used to determine with reasonable assurance that the performance objectives for the period after permanent closure will be met''. The overall Performance Confirmation program begins during site characterization and continues up to repository closure. The main purpose of this document is to develop, explore and analyze initial concepts for using remotely operated and robotic systems in gathering repository performance information during Performance Confirmation. This analysis focuses primarily on possible Performance Confirmation related applications within the emplacement drifts after waste packages have been emplaced (post-emplacement) and before permanent closure of the repository (preclosure). This will be a period of time lasting approximately 100 years and basically coincides with the Caretaker phase of the project. This analysis also examines, to a lesser extent, some applications related to Caretaker operations. A previous report examined remote handling and robotic technologies that could be employed during the waste package emplacement phase of the project (Reference 5.1). This analysis is being prepared to provide an early investigation of possible design concepts and technical challenges associated with developing remote systems for monitoring and inspecting activities during Performance Confirmation. The writing of this analysis preceded formal development of Performance Confirmation functional requirements and program plans and therefore examines, in part, the fundamental Performance Confirmation monitoring needs and operating conditions. The scope and primary objectives of this analysis are to: (1) Describe the operating environment and conditions expected in the emplacement drifts during the preclosure period. (Presented in Section 7.2). (2

  17. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  18. Fringe tracking performance monitoring: FINITO at VLTI

    CERN Document Server

    Merand, A; Berger, J -P; Percheron, I; Poupar, S

    2012-01-01

    Since April 2011, realtime fringe tracking data are recorded simultaneously with data from the VLTI/AMBER interferometric beam combiner. Not only this offers possibilities to post-process AMBER reduced data to obtain more accurate interferometric quantities, it also allows to estimate the performance of the fringe tracking a function of the conditions of seeing, coherence time, flux, etc. First we propose to define fringe tracking performance metrics in the AMBER context, in particular as a function of AMBER's integration time. The main idea is to determine the optimal exposure time for AMBER: short exposures are dominated by readout noise and fringes in long exposures are completely smeared out. Then we present this performance metrics correlated with Paranal local ASM (Ambient Site Monitor) measurements, such as seeing, coherence time or wind speed for example. Finally, we also present some preliminary results of attempts to model and predict fringe tracking performances, using Artificial Neural Networks.

  19. Database Performance Monitoring for the Photovoltaic Systems

    Energy Technology Data Exchange (ETDEWEB)

    Klise, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-10-01

    The Database Performance Monitoring (DPM) software (copyright in processes) is being developed at Sandia National Laboratories to perform quality control analysis on time series data. The software loads time indexed databases (currently csv format), performs a series of quality control tests defined by the user, and creates reports which include summary statistics, tables, and graphics. DPM can be setup to run on an automated schedule defined by the user. For example, the software can be run once per day to analyze data collected on the previous day. HTML formatted reports can be sent via email or hosted on a website. To compare performance of several databases, summary statistics and graphics can be gathered in a dashboard view which links to detailed reporting information for each database. The software can be customized for specific applications.

  20. Digital Image Correlation for Performance Monitoring.

    Energy Technology Data Exchange (ETDEWEB)

    Palaviccini, Miguel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Turner, Daniel Z. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Herzberg, Michael [National Security Campus, Kansas City, MO (United States)

    2016-02-01

    Evaluating the health of a mechanism requires more than just a binary evaluation of whether an operation was completed. It requires analyzing more comprehensive, full-field data. Health monitoring is a process of nondestructively identifying characteristics that indicate the fitness of an engineered component. In order to monitor unit health in a production setting, an automated test system must be created to capture the motion of mechanism parts in a real-time and non-intrusive manner. One way to accomplish this is by using high-speed video (HSV) and Digital Image Correlation (DIC). In this approach, individual frames of the video are analyzed to track the motion of mechanism components. The derived performance metrics allow for state-of-health monitoring and improved fidelity of mechanism modeling. The results are in-situ state-of-health identification and performance prediction. This paper introduces basic concepts of this test method, and discusses two main themes: the use of laser marking to add fiducial patterns to mechanism components, and new software developed to track objects with complex shapes, even as they move behind obstructions. Finally, the implementation of these tests into an automated tester is discussed.

  1. Improved PSI Performance for Landslide Monitoring Applications

    Science.gov (United States)

    Duro, Javier; Iglesias, Ruben; Blanco, Pablo; Sanchez, Francisco; Albiol, David

    2015-05-01

    The work proposed in this paper shows advanced Persistent Scatter Interferometry (PSI) processing based on the use of the Non-Local Interferometric SAR (NLInSAR) filtering for improving landslides monitoring applications. The rationale is to enhance the interferometric phase quality, preserving the full resolution of SAR images, in order to detect both distributed and deterministic scatterers, with the objective of increasing the density of final PSI products. Moreover, since SAR systems are only sensitive to detect displacements in the line-of-sight (LOS) direction, the importance of projecting PSI displacement products along the steepest gradient of the terrain slope is put forward. Two TerraSAR-X data sets acquired in ascending mode corresponding to the period from April to November 2011, and from August to November 2013, respectively, over the area of El Portalet (Central Spanish Pyrenees), are employed for this purpose.

  2. Who can monitor the court interpreter's performance?

    DEFF Research Database (Denmark)

    Martinsen, Bodil

    2009-01-01

    and the conflict about her competence was negotiated. Because of this unusual constellation, combined with a multi-method approach, this single case study can shed some light on the question of the participants' ability to monitor the interpreter's performance. Legal professional users of interpreters tend...... to assume that they are able to monitor and thus evaluate the interpreting if the foreign language used in court belongs to the major ones within the Danish educational system, like English or French, contrary to "exotic" migrant languages. This paper highlights the problem that the interpreted proceedings...... are far less transparent for the legal participants than they normally assume. This problem, in turn, stresses the importance of a) the interpreter's competence and self-awareness and b) the use of check interpreters.  ...

  3. Medication monitoring and drug testing ethics project.

    Science.gov (United States)

    Payne, Richard; Moe, Jeffrey L; Sevier, Catherine Harvey; Sevier, David; Waitzkin, Michael

    2015-01-01

    In 2012, Duke University initiated a research project, funded by an unrestricted research grant from Millennium Laboratories, a drug testing company. The project focused on assessing the frequency and nature of questionable, unethical, and illegal business practices in the clinical drug testing industry and assessing the potential for establishing a business code of ethics. Laboratory leaders, clinicians, industry attorneys, ethicists, and consultants participated in the survey, were interviewed, and attended two face-to-face meetings to discuss a way forward. The study demonstrated broad acknowledgment of variations in the legal and regulatory environment, resulting in inconsistent enforcement of industry practices. Study participants expressed agreement that overtly illegal practices sometimes exist, particularly when laboratory representatives and clinicians discuss reimbursement, extent of testing, and potential business incentives with medical practitioners. Most respondents reported directly observing probable violations involving marketing materials, contracts, or, in the case of some individuals, directly soliciting people with offers of clinical supplies and other "freebies." While many study respondents were skeptical that voluntary standards alone would eliminate questionable business practices, most viewed ethics codes and credentialing as an important first step that could potentially mitigate uneven enforcement, while improving quality of care and facilitating preferred payment options for credentialed parties. Many were willing to participate in future discussions and industry-wide initiatives to improve the environment.

  4. UCIMS: Advances in geotechnical construction and performance monitoring

    Directory of Open Access Journals (Sweden)

    Raphael Siebenmann

    2015-04-01

    Full Text Available The Crossrail project currently under construction in Central London has been described as “The Big Dig on Steroids”, obviously referencing the Central Artery/Tunnel project in Boston completed in 2007. To address the multiple demands for timely construction performance monitoring, Crossrail envisioned the underground construction information management system (UCIMS to monitor construction progress and structural health along the entire route, with a network of geotechnical instruments (i.e. slope inclinometers, extensometers, piezometers, etc. and tunnel boring machine (TBM position information. The UCIMS is a geospatially referenced relational database that was developed using an open source geographic information system (GIS that allowed all stakeholders near immediate feedback of construction performance. The purpose of this article is to provide a brief history of geotechnical and structural monitoring software, to describe the structure and operation of the UCIMS, and to demonstrate how the functionality afforded by this system provided the requisite feedback to the stakeholders. Examples will be given regarding how the data management and visualization concepts incorporated into the UCIMS advanced the geotechnical construction industry.

  5. UCIMS:Advances in geotechnical construction and performance monitoring

    Institute of Scientific and Technical Information of China (English)

    Raphael Siebenmann a; Hai-Tien Yu b; Robert Bachus a

    2015-01-01

    The Crossrail project currently under construction in Central London has been described as“The Big Dig on Steroids”, obviously referencing the Central Artery/Tunnel project in Boston completed in 2007. To address the multiple demands for timely construction performance monitoring, Crossrail envisioned the underground construction information management system (UCIMS) to monitor construction progress and structural health along the entire route, with a network of geotechnical instruments (i.e. slope in-clinometers, extensometers, piezometers, etc.) and tunnel boring machine (TBM) position information. The UCIMS is a geospatially referenced relational database that was developed using an open source geographic information system (GIS) that allowed all stakeholders near immediate feedback of con-struction performance. The purpose of this article is to provide a brief history of geotechnical and structural monitoring software, to describe the structure and operation of the UCIMS, and to demon-strate how the functionality afforded by this system provided the requisite feedback to the stakeholders. Examples will be given regarding how the data management and visualization concepts incorporated into the UCIMS advanced the geotechnical construction industry.

  6. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-15

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork.

  7. Use Alkalinity Monitoring to Optimize Bioreactor Performance.

    Science.gov (United States)

    Jones, Christopher S; Kult, Keegan J

    2016-05-01

    In recent years, the agricultural community has reduced flow of nitrogen from farmed landscapes to stream networks through the use of woodchip denitrification bioreactors. Although deployment of this practice is becoming more common to treat high-nitrate water from agricultural drainage pipes, information about bioreactor management strategies is sparse. This study focuses on the use of water monitoring, and especially the use of alkalinity monitoring, in five Iowa woodchip bioreactors to provide insights into and to help manage bioreactor chemistry in ways that will produce desirable outcomes. Results reported here for the five bioreactors show average annual nitrate load reductions between 50 and 80%, which is acceptable according to established practice standards. Alkalinity data, however, imply that nitrous oxide formation may have regularly occurred in at least three of the bioreactors that are considered to be closed systems. Nitrous oxide measurements of influent and effluent water provide evidence that alkalinity may be an important indicator of bioreactor performance. Bioreactor chemistry can be managed by manipulation of water throughput in ways that produce adequate nitrate removal while preventing undesirable side effects. We conclude that (i) water should be retained for longer periods of time in bioreactors where nitrous oxide formation is indicated, (ii) measuring only nitrate and sulfate concentrations is insufficient for proper bioreactor operation, and (iii) alkalinity monitoring should be implemented into protocols for bioreactor management.

  8. The WATCH All-Sky Monitor for the Granat Project

    DEFF Research Database (Denmark)

    Brandt, Søren; Lund, Niels; Rao, A. R.

    1990-01-01

    The Watch X-ray all-sky monitor, which is designed to localize strong X-ray sources and follow their development, is examined, focusing on the addition of four Watch units to the Granat satellite project. The components of the Watch instrument are described and the capabilities and potential...... scientific returns of the Granat project are discussed. The applications of the Watch monitor are given, including the study of time variations of known sources and the detection and localization of new, transient sources....

  9. Project Planning, Implementation and Monitoring Issues, Findings and Recommendations

    Directory of Open Access Journals (Sweden)

    Muhammad Salim Javed

    2012-08-01

    Full Text Available The Higher Education Commission (HEC, Pakistan is one of the prestigious institutions of Government of Pakistan. It sets educational policies for all public and private sector universities of Pakistan. The objective of this study is to find institutional problems and issues of a project planning, implementation and monitoring issues. For this purpose, projects data were collected from Project Directors, HEC personnel's and consultants. Data were collected from 150 public and private sector universities and higher learning institution in the regions of Pakistan (i.e., Khyber Pakhtoon Khwa, Punjab, Sindh, Balochistan and Azad Jamu Kashmir using questionnaires. To provide the data, respondents were given the choice of being interviewed or self-administer the questionnaire and send them back to the researcher. After studying and analyzing the data, main problem and issues in project planning, implementation and monitoring issues were identified. In the view of these responses, rPecommendation had been concluded.

  10. Project monitor. Final report. [Allegheny County, PA

    Energy Technology Data Exchange (ETDEWEB)

    Hammond, P.Y.; Beck, P.; Doctors, S.I.

    1979-04-27

    Results are reported of a study of consumers' energy attitudes and behavior. Household consumers and small business consumers (both retail and manufacturing) responded to the survey, but only the household results are reported. The study sought to understand energy-related behavior at the level where the various components of energy policy intersect. Attempts are made to attain this goal by determining the extent to which various properties of the individuals and firms are associated with various amounts of conservation. A representative sample of the adult population in Allegheny County, Pennsylvania was interviewed. Part I introduces the measures of household conservation to be used in the survey. Part II analyzes each of the types of energy conservation - general, winterization, heating, cooling, appliance, transportation, and electricity reductions - and relates them to demographic, situation, attitudinal, and perceptual variables in the household sample. Part III deals with the impacts of Project Pacesetter and the United Mine Workers' strike against the coal operators - particularly, the impact of the coal strike on household residents of Allegheny County. Part IV summarizes the findings and uses them for recommendations regarding energy conservation policy. Additional data are presented in 4 appendices. (MCW)

  11. Integrated System for Performance Monitoring of ATLAS TDAQ Network

    CERN Document Server

    Savu, D; The ATLAS collaboration; Martin, B; Sjoen, R; Batraneanu, S; Stancu, S

    2010-01-01

    The ATLAS TDAQ Network consists of three separate networks spanning four levels of the experimental building. Over 200 edge switches and 5 multi-blade chassis routers are used to interconnect 2000 processors, adding up to more than 7000 high speed interfaces. In order to substantially speed-up ad-hoc and post mortem analysis, a scalable, yet flexible, integrated system for monitoring both network statistics and environmental conditions, processor parameters and data taking characteristics was required. For successful up-to-the-minute monitoring, information from many SNMP compliant devices, independent databases and custom APIs was gathered, stored and displayed in an optimal way. Easy navigation and compact aggregation of multiple data sources were the main requirements; characteristics not found in any of the tested products, either open-source or commercial. This paper describes how performance, scalability and display issues were addressed and what challenges the project faced during development and deplo...

  12. Project Complexity Influence on Project management performance – The Malaysian perspective

    OpenAIRE

    Abdou Saed M; Yong Kuan; Othman Mohammed

    2016-01-01

    The project complexity has a negative influence upon project management process particularly on the project performance. The lack of consensus on project complexity is a crucial problem as project complexity is closely correlated with the project management process as well as the project management performance. Therefore,the understanding of project complexity is of significant importance to address the problem of project management performance. Our extensive literature review enlightened the...

  13. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is anno

  14. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is

  15. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is anno

  16. Het Project Monitoring Risicofactoren en Gezondheid Nederland (MORGEN-project). Jaarverslag 1993

    NARCIS (Netherlands)

    Smit HA; Verschuren WMM; Bueno de Mesquita HB; Seidell JC; CCM

    1994-01-01

    The Monitoring Project on Risk Factors for Chronic Diseases (MORGEN-project) is conducted by the National Institute of Public Health and Environmental Protection (RIVM). Its general purpose is to determine the prevalence of risk factors for chronic diseases as well as the prevalence of some specific

  17. 75 FR 8036 - Monitor-Hot Creek Rangeland Project

    Science.gov (United States)

    2010-02-23

    ... comprises approximately 952,234 acres and is located on the Monitor and Hot Creek Mountain Ranges in Eureka, Nye and Lander Counties, Nevada. DATES: Comments concerning the scope of the analysis must be received... Vernon Keller, Project Coordinator, at 1200 Franklin Way, Sparks, Nevada 89431. The telephone number...

  18. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  19. Tracer monitoring of enhanced oil recovery projects

    Directory of Open Access Journals (Sweden)

    Kleven R.

    2013-05-01

    Full Text Available In enhanced oil recovery (EOR, chemicals are injected into the oil reservoir, either to increase macroscopic sweep efficiency, or to reduce remaining oil saturation in swept zones. Tracers can be used to identify reservoirs that are specifically suited for EOR operations. Injection of a selection of partitioning tracers, combined with frequent sample analysis of produced fluids, provides information suited for estimation of residual oil saturation. Tracers can also be used to evaluate and optimize the application of EOR chemicals in the reservoir. Suitable tracers will follow the EOR chemicals and assist in evaluation of retention, degradation or trapping. In addition to field applications, tracers also have a large potential as a tool to perform mechanistic studies of EOR chemicals in laboratory experiments. By labelling EOR chemicals with radioactive isotopes of elements such as H, C and S, detailed studies of transport mechanisms can be carried out. Co-injection of labelled compounds in dynamic flooding experiments in porous media will give information about retention or separation of the unique compounds constituting the chemical formulation. Separation of such compounds may be detrimental to obtaining the EOR effect expected. The paper gives new information of specific methods, and discusses current status for use of tracers in EOR operations.

  20. Het Project Monitoring Risicofactoren en Gezondheid Nederland (MORGEN-project). Jaarverslag 1993

    OpenAIRE

    1994-01-01

    The Monitoring Project on Risk Factors for Chronic Diseases (MORGEN-project) is conducted by the National Institute of Public Health and Environmental Protection (RIVM). Its general purpose is to determine the prevalence of risk factors for chronic diseases as well as the prevalence of some specific chronic conditions in a sample of the general population. In the MORGEN-project, data on the health status and prevalence of risk factors are collected in a random sample of the general population...

  1. Distributed Rocket Engine Testing Health Monitoring System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The on-ground and Distributed Rocket Engine Testing Health Monitoring System (DiRETHMS) provides a system architecture and software tools for performing diagnostics...

  2. HOW EGYPTIAN CONTRACTING COMPANIES TRANSLATE PROJECTS' QUALITY TO PROJECTS' PERFORMANCE

    Directory of Open Access Journals (Sweden)

    Said SHAWKY HOZIEN

    2011-07-01

    Full Text Available A model for continuous quality improvement for Egyptian contracting projects’ (CQIM is developed through the extensive reviewing of the Total Quality Management (TQM, Continuous Quality Improvement (CQIliterature, preceding researches, consensus opinions of managers and experts of the construction industry and the quality management system (ISO 9000. This model comprises of 13 main factors divided into 9 CQI constructs and 4 Indices, the Indices are broken down to 46 practical measures, while the CQI constructs are further divided into 58 sub-factors consisting of 231 practical requirements, all targeting the evaluation and improvement of the overall project performance (OPP . This model assists its users to assess their points of weaknesses and strengths, by setting-up a road map for improvement, utilizing a guided framework. This model is used as a benchmarking tool to achieve the goal of this research “Projects' Continuous Quality Improvement”.

  3. 7 CFR 3405.19 - Monitoring progress of funded projects.

    Science.gov (United States)

    2010-01-01

    ... RESEARCH, EDUCATION, AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE HIGHER EDUCATION CHALLENGE GRANTS... Annual Performance Reports should include a summary of the overall progress toward project objectives... reform, and opportunities to enhance dissemination of exemplary end products/results. (b) An...

  4. 7 CFR 3406.26 - Monitoring progress of funded projects.

    Science.gov (United States)

    2010-01-01

    ... award. These reports are in addition to the annual Current Research Information System (CRIS) reports... RESEARCH, EDUCATION, AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE 1890 INSTITUTION CAPACITY BUILDING... Annual Performance Reports should include a summary of the overall progress toward project...

  5. Remote monitoring of LED lighting system performance

    Science.gov (United States)

    Thotagamuwa, Dinusha R.; Perera, Indika U.; Narendran, Nadarajah

    2016-09-01

    The concept of connected lighting systems using LED lighting for the creation of intelligent buildings is becoming attractive to building owners and managers. In this application, the two most important parameters include power demand and the remaining useful life of the LED fixtures. The first enables energy-efficient buildings and the second helps building managers schedule maintenance services. The failure of an LED lighting system can be parametric (such as lumen depreciation) or catastrophic (such as complete cessation of light). Catastrophic failures in LED lighting systems can create serious consequences in safety critical and emergency applications. Therefore, both failure mechanisms must be considered and the shorter of the two must be used as the failure time. Furthermore, because of significant variation between the useful lives of similar products, it is difficult to accurately predict the life of LED systems. Real-time data gathering and analysis of key operating parameters of LED systems can enable the accurate estimation of the useful life of a lighting system. This paper demonstrates the use of a data-driven method (Euclidean distance) to monitor the performance of an LED lighting system and predict its time to failure.

  6. Enhancing The National Map Through Tactical Planning and Performance Monitoring

    Science.gov (United States)

    ,

    2008-01-01

    Tactical planning and performance monitoring are initial steps toward improving 'the way The National Map works' and supporting the U.S. Geological Survey (USGS) Science Strategy. This Tactical Performance Planning Summary for The National Map combines information from The National Map 2.0 Tactical Plan and The National Map Performance Milestone Matrix. The National Map 2.0 Tactical Plan is primarily a working document to guide The National Map program's execution, production, and metrics monitoring for fiscal years (FY) 2008 and 2009. The Tactical Plan addresses data, products, and services, as well as supporting and enabling activities. The National Map's 2-year goal for FY 2008 and FY 2009 is to provide a range of geospatial products and services that further the National Spatial Data Infrastructure and underpin USGS science. To do this, the National Geospatial Program will develop a renewed understanding during FY 2008 of key customer needs and requirements, develop the infrastructure to support The National Map business model, modernize its business processes, and reengineer its workforce. Priorities for The National Map will be adjusted if necessary to respond to changes to the project that may impact resources, constrain timeframes, or change customer needs. The supporting and enabling activities that make it possible to produce the products and services of The National Map will include partnership activities, improved compatibility of systems, outreach, and integration of data themes.

  7. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  8. PENERAPAN SISTEM ERP DALAM MEMBUAT PROJECT FEASIBILITY, PROJECT STATUS DAN PROJECT MONITORING PADA PERUSAHAAN DI BIDANG KONTRAKTOR

    Directory of Open Access Journals (Sweden)

    Hendra Alianto

    2013-11-01

    cost reduction, and improvement of business processes, which will result in an increase in the work (productivity to become more efficient and effective. However, practically some organizations have problems on running ERP system, some even fail. Therefore, a strategy is needed to help the information systems project. Making project feasibility, project status and project monitoring ERP system can be used as a guide in the design of the ERP program applications to become more user-friendly and suitable for the organization needs. The ERP system applied to a contracting company will increase productivity and achieve the level of effectiveness and efficiency of the company's operations. Through strategies in making project feasibility, and status monitoring with ERP system will provide a positive contribution to the development and objectives of the company, so as to improve the effectiveness and efficiency in the processing operations.

  9. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    BUSSELL, J.H.

    1999-08-25

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.

  10. The MAGNUM (Multicolor Active Galactic NUclei Monitoring) Project

    Science.gov (United States)

    Yoshii, Y.; Kobayashi, Y.; Minezaki, T.

    2003-05-01

    The MAGNUM Project is designed to carry out long-term monitoring observations of hundreds of active galactic nuclei in the visible and near-infrared wavelength regions. In order to obtain these observations, we built a new 2m optical-infrared telescope, and located it near the Haleakala summit at a height of 3050m within the area of the University of Hawaii's Haleakala Observatory on the Hawaiian Island of Maui. The Project was funded in 1995 and preliminary observations were started early in 2001. We are working toward the realization of an unmanned, automated observatory which is suitable to relatively simple and stable observations over many years. We present an overview of the Project and its current status.

  11. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    Energy Technology Data Exchange (ETDEWEB)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C. [and others

    1997-01-15

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables.

  12. Real-time performance monitoring and management system

    Science.gov (United States)

    Budhraja, Vikram S.; Dyer, James D.; Martinez Morales, Carlos A.

    2007-06-19

    A real-time performance monitoring system for monitoring an electric power grid. The electric power grid has a plurality of grid portions, each grid portion corresponding to one of a plurality of control areas. The real-time performance monitoring system includes a monitor computer for monitoring at least one of reliability metrics, generation metrics, transmission metrics, suppliers metrics, grid infrastructure security metrics, and markets metrics for the electric power grid. The data for metrics being monitored by the monitor computer are stored in a data base, and a visualization of the metrics is displayed on at least one display computer having a monitor. The at least one display computer in one said control area enables an operator to monitor the grid portion corresponding to a different said control area.

  13. Permafrost and Active Layer Monitoring in the Maritime Antarctic: A Contribution to TSP and ANTPAS projects

    Science.gov (United States)

    Vieira, G.; Ramos, M.; Batista, V.; Caselli, A.; Correia, A.; Fragoso, M.; Gruber, S.; Hauck, C.; Kenderova, R.; Lopez-Martinez, J.; Melo, R.; Mendes-Victor, L. A.; Miranda, P.; Mora, C.; Neves, M.; Pimpirev, C.; Rocha, M.; Santos, F.; Blanco, J. J.; Serrano, E.; Trigo, I.; Tome, D.; Trindade, A.

    2008-12-01

    Permafrost and active layer monitoring in the Maritime Antarctic (PERMANTAR) is a Portuguese funded International Project that, in cooperation with the Spanish project PERMAMODEL, will assure the installation and the maintenance of a network of boreholes and active layer monitoring sites, in order to characterize the spatial distribution of the physical and thermal properties of permafrost, as well as the periglacial processes in Livingston and Deception Islands (South Shetlands). The project is part of the International Permafrost Association IPY projects Thermal State of Permafrost (TSP) and Antarctic and Sub-Antarctic Permafrost, Soils and Periglacial Environments (ANTPAS). It contributes to GTN-P and CALM-S networks. The PERMANTAR-PERMAMODEL permafrost and active layer monitoring network includes several boreholes: Reina Sofia hill (since 2000, 1.1m), Incinerador (2000, 2.3m), Ohridski 1 (2008, 5m), Ohridski 2 (2008, 6m), Gulbenkian-Permamodel 1 (2008, 25m) and Gulbenkian- Permamodel 2 (2008, 15m). For active layer monitoring, several CALM-S sites have been installed: Crater Lake (2006), Collado Ramos (2007), Reina Sofia (2007) and Ohridski (2007). The monitoring activities are accompanied by detailed geomorphological mapping in order to identify and map the geomorphic processes related to permafrost or active layer dynamics. Sites will be installed in early 2009 for monitoring rates of geomorphological activity in relation to climate change (e.g. solifluction, rockglaciers, thermokarst). In order to analyse the spatial distribution of permafrost and its ice content, electrical resistivity tomography (ERT), and seismic refraction surveys have been performed and, in early 2009, continuous ERT surveying instrumentation will be installed for monitoring active layer evolution. The paper presents a synthesis of the activities, as well as the results obtained up to the present, mainly relating to ground temperature monitoring and from permafrost characteristics and

  14. Wearable electrochemical sensors for monitoring performance athletes

    Science.gov (United States)

    Fraser, Kevin J.; Curto, Vincenzo F.; Coyle, Shirley; Schazmann, Benjamin; Byrne, Robert; Benito-Lopez, Fernando; Owens, Róisín M.; Malliaras, George G.; Diamond, Dermot

    2011-10-01

    Nowadays, wearable sensors such as heart rate monitors and pedometers are in common use. The use of wearable systems such as these for personalized exercise regimes for health and rehabilitation is particularly interesting. In particular, the true potential of wearable chemical sensors, which for the real-time ambulatory monitoring of bodily fluids such as tears, sweat, urine and blood has not been realized. Here we present a brief introduction into the fields of ionogels and organic electrochemical transistors, and in particular, the concept of an OECT transistor incorporated into a sticking-plaster, along with a printable "ionogel" to provide a wearable biosensor platform.

  15. International Energy Agency (IEA) Greenhouse Gas (GHG) Weyburn-Midale CO₂ Monitoring and Storage Project

    Energy Technology Data Exchange (ETDEWEB)

    Sacuta, Norm [Petroleum Technology Research Centre Incorporated, Saskatchewan (Canada); Young, Aleana [Petroleum Technology Research Centre Incorporated, Saskatchewan (Canada); Worth, Kyle [Petroleum Technology Research Centre Incorporated, Saskatchewan (Canada)

    2015-12-22

    The IEAGHG Weyburn-Midale CO₂ Monitoring and Storage Project (WMP) began in 2000 with the first four years of research that confirmed the suitability of the containment complex of the Weyburn oil field in southeastern Saskatchewan as a storage location for CO₂ injected as part of enhanced oil recovery (EOR) operations. The first half of this report covers research conducted from 2010 to 2012, under the funding of the United States Department of Energy (contract DEFE0002697), the Government of Canada, and various other governmental and industry sponsors. The work includes more in-depth analysis of various components of a measurement, monitoring and verification (MMV) program through investigation of data on site characterization and geological integrity, wellbore integrity, storage monitoring (geophysical and geochemical), and performance/risk assessment. These results then led to the development of a Best Practices Manual (BPM) providing oilfield and project operators with guidance on CO₂ storage and CO₂-EOR. In 2013, the USDOE and Government of Saskatchewan exercised an optional phase of the same project to further develop and deploy applied research tools, technologies, and methodologies to the data and research at Weyburn with the aim of assisting regulators and operators in transitioning CO₂-EOR operations into permanent storage. This work, detailed in the second half of this report, involves seven targeted research projects – evaluating the minimum dataset for confirming secure storage; additional overburden monitoring; passive seismic monitoring; history-matched modelling; developing proper wellbore design; casing corrosion evaluation; and assessment of post CO₂-injected core samples. The results from the final and optional phases of the Weyburn-Midale Project confirm the suitability of CO₂-EOR fields for the injection of CO₂, and further, highlight the necessary MMV and follow-up monitoring required for these operations to be considered

  16. Parental Monitoring and Child Performance in Ghana

    Science.gov (United States)

    Gyamfi, Kwadwo; Pobbi, Michael Asamani

    2016-01-01

    The role of parents in the guiding and monitoring of child activities is critical towards the development of the child. In Ghana reforms taken, especially at the basic school level, have focused on improving school infrastructure and enrollment ignoring parents awareness to actively involve themselves both at home and in school activities which…

  17. Method and apparatus for monitoring machine performance

    Science.gov (United States)

    Smith, Stephen F.; Castleberry, Kimberly N.

    1996-01-01

    Machine operating conditions can be monitored by analyzing, in either the time or frequency domain, the spectral components of the motor current. Changes in the electric background noise, induced by mechanical variations in the machine, are correlated to changes in the operating parameters of the machine.

  18. Performance evaluation of salivary amylase activity monitor.

    Science.gov (United States)

    Yamaguchi, Masaki; Kanemori, Takahiro; Kanemaru, Masashi; Takai, Noriyasu; Mizuno, Yasufumi; Yoshida, Hiroshi

    2004-10-15

    In order to quantify psychological stress and to distinguish eustress and distress, we have been investigating the establishment of a method that can quantify salivary amylase activity (SMA). Salivary glands not only act as amplifiers of a low level of norepinephrine, but also respond more quickly and sensitively to psychological stress than cortisol levels. Moreover, the time-course changes of the salivary amylase activity have a possibility to distinguish eustress and distress. Thus, salivary amylase activity can be utilized as an excellent index for psychological stress. However, in dry chemistry system, a method for quantification of the enzymatic activity still needs to be established that can provide with sufficient substrate in a testing tape as well as can control enzymatic reaction time. Moreover, it is necessary to develop a method that has the advantages of using saliva, such as ease of collection, rapidity of response, and able to use at any time. In order to establish an easy method to monitor the salivary amylase activity, a salivary transcription device was fabricated to control the enzymatic reaction time. A fabricated salivary amylase activity monitor consisted of three devices, the salivary transcription device, a testing-strip and an optical analyzer. By adding maltose as a competitive inhibitor to a substrate Ga1-G2-CNP, a broad-range activity testing-strip was fabricated that could measure the salivary amylase activity with a range of 0-200 kU/l within 150 s. The calibration curve of the monitor for the salivary amylase activity showed R2=0.941, indicating that it was possible to use this monitor for the analysis of the salivary amylase activity without the need to determine the salivary volume quantitatively. In order to evaluate the assay variability of the monitor, salivary amylase activity was measured using Kraepelin psychodiagnostic test as a psychological stressor. A significant difference of salivary amylase activity was recognized

  19. 36 CFR 1207.40 - Monitoring and reporting program performance.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Monitoring and reporting program performance. 1207.40 Section 1207.40 Parks, Forests, and Public Property NATIONAL ARCHIVES AND... and that performance goals are being achieved. Grantee monitoring must cover each program, function...

  20. International Remote Monitoring Project Embalse Nuclear Power Station, Argentina Embalse Remote Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, Sigfried L.; Glidewell, Donnie D.; Bonino, Anibal; Bosler, Gene; Mercer, David; Maxey, Curt; Vones, Jaromir; Martelle, Guy; Busse, James; Kadner, Steve; White, Mike; Rovere, Luis

    1999-07-21

    The Autoridad Regulatoria Nuclear of Argentina (ARN), the International Atomic Energy Agency (IAEA), ABACC, the US Department of Energy, and the US Support Program POTAS, cooperated in the development of a Remote Monitoring System for nuclear nonproliferation efforts. This system was installed at the Embalse Nuclear Power Station last year to evaluate the feasibility of using radiation sensors in monitoring the transfer of spent fuel from the spent fuel pond to dry storage. The key element in this process is to maintain continuity of knowledge throughout the entire transfer process. This project evaluated the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguard efficiency. New technology has been developed to enhance the design of the system to include storage capability on board sensor platforms. This evaluation has led to design enhancements that will assure that no data loss will occur during loss of RF transmission of the sensors.

  1. Monitoring Global Croplands with Coarse Resolution Earth Observations: The Global Agriculture Monitoring (GLAM Project

    Directory of Open Access Journals (Sweden)

    Inbal Becker-Reshef

    2010-06-01

    Full Text Available In recent years there has been a dramatic increase in the demand for timely, comprehensive global agricultural intelligence. Timely information on global crop production is indispensable for combating the growing stress on the world’s crop production and for securing both short-term and long-term stable and reliable supply of food. Global agriculture monitoring systems are critical to providing this kind of intelligence and global earth observations are an essential component of an effective global agricultural monitoring system as they offer timely, objective, global information on croplands distribution, crop development and conditions as the growing season progresses. The Global Agriculture Monitoring Project (GLAM, a joint NASA, USDA, UMD and SDSU initiative, has built a global agricultural monitoring system that provides the USDA Foreign Agricultural Service (FAS with timely, easily accessible, scientifically-validated remotely-sensed data and derived products as well as data analysis tools, for crop-condition monitoring and production assessment. This system is an integral component of the USDA’s FAS Decision Support System (DSS for agriculture. It has significantly improved the FAS crop analysts’ ability to monitor crop conditions, and to quantitatively forecast crop yields through the provision of timely, high-quality global earth observations data in a format customized for FAS alongside a suite of data analysis tools. FAS crop analysts use these satellite data in a ‘convergence of evidence’ approach with meteorological data, field reports, crop models, attaché reports and local reports. The USDA FAS is currently the only operational provider of timely, objective crop production forecasts at the global scale. These forecasts are routinely used by the other US Federal government agencies as well as by commodity trading companies, farmers, relief agencies and foreign governments. This paper discusses the operational components

  2. Who can monitor the court interpreter's performance?

    DEFF Research Database (Denmark)

    Martinsen, Bodil

    2009-01-01

    to assume that they are able to monitor and thus evaluate the interpreting if the foreign language used in court belongs to the major ones within the Danish educational system, like English or French, contrary to "exotic" migrant languages. This paper highlights the problem that the interpreted proceedings...... are far less transparent for the legal participants than they normally assume. This problem, in turn, stresses the importance of a) the interpreter's competence and self-awareness and b) the use of check interpreters.  ...

  3. High Performance Nitrous Oxide Analyzer for Atmospheric Research Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This project targets the development of a highly sensitive gas sensor to monitor atmospheric nitrous oxide. Nitrous oxide is an important species in Earth science...

  4. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Keefe, MaryLouise; Carmichael, Richard W.; French, Rod A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1993-03-01

    This report covers the first year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary. The most crucial data for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available. A comprehensive fish health monitoring regimen was incorporated into the monitoring and evaluation study for Umatilla Hatchery. This is a unique feature of the Umatilla Hatchery evaluation project.

  5. Characterization, Monitoring, and Risk Assessment at the IEA GHG Weyburn-Midale CO2 Monitoring and Storage Project, Saskatchewan, Canada.

    Science.gov (United States)

    Ben, R.; Chalaturnyk, R.; Gardner, C.; Hawkes, C.; Johnson, J.; White, D.; Whittaker, S.

    2008-12-01

    In July 2000, a major research project was initiated to study the geological storage of CO2 as part of a 5000 tonnes/day EOR project planned for the Weyburn Field in Saskatchewan, Canada. Major objectives of the IEA GHG Weyburn CO2 monitoring and storage project included: assessing the integrity of the geosphere encompassing the Weyburn oil pool for effective long-term storage of CO2; monitoring the movement of the injected CO2, and assessing the risk of migration of CO2 from the injection zone (approximately 1500 metres depth) to the surface. Over the period 2000-2004, a diverse group of 80+ researchers worked on: geological, geophysical, and hydrogeological characterizations at both the regional (100 km beyond the field) and detailed scale (10 km around the field); conducted time-lapse geophysical surveys; carried out surface and subsurface geochemical surveys; and undertook numerical reservoir simulations. Results of the characterization were used for a performance assessment that concluded the risk of CO2 movement to the biosphere was very small. By September 2007, more than 14 Mtonnes of CO2 had been injected into the Weyburn reservoir, including approximately 3 Mtonnes recycled from oil production. A "Final Phase" research project was initiated (2007- 2011) to contribute to a "Best Practices" guide for long-term CO2 storage in EOR settings. Research objectives include: improving the geoscience characterization; further detailed analysis and data collection on the role of wellbores; additional geochemical and geophysical monitoring activities; and an emphasis on quantitative risk assessments using multiple analysis techniques. In this talk a review of results from Phase I will be presented followed by plans and initial results for the Final Phase.

  6. Performance of the CMS Beam Halo Monitor

    CERN Document Server

    CMS Collaboration

    2015-01-01

    The CMS Beam Halo Monitor has been successfully installed in the CMS cavern in LHC Long Shutdown 1 for measuring the machine induced background for LHC Run II. The system is based on 40 detector units composed of radiation hard synthetic quartz Cherenkov radiators coupled to fast photomultiplier tubes for a direction sensitive measurement. The readout electronics chain uses many components developed for the Phase 1 upgrade to the CMS Hadronic Calorimeter electronics, with dedicated firmware and readout adapted to the beam monitoring requirements. The PMT signal is digitized by a charge integrating ASIC (QIE10), providing both the signal rise time, with few ns resolution, and the charge integrated over one bunch crossing. The backend electronics uses microTCA technology and received data via a high-speed 5 Gbps asynchronous link. It records histograms with sub-bunch crossing timing resolution and is readout by IPbus using the newly designed CMS data acquisition for non-event based data. The data is processed i...

  7. An overview of the Environmental Monitoring Computer Automation Project

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, S.M.; Lorenz, R.

    1992-01-01

    The Savannah River Site (SRS) was bulk to produce plutonium and tritium for national defense. As a result of site operations, routine and accidental releases of radionuclides have occurred. The effects these releases have on the k>cal population and environment are of concern to the Department of Energy (DOE) and SRS personnel. Each year, approximately 40,000 environmental samples are collected. The quality of the samples, analytical methods and results obtained are important to site personnel. The Environmental Monitoring Computer Automation Project (EMCAP) was developed to better manage scheduling, log-in, tracking, analytical results, and report generation. EMCAP can be viewed as a custom Laboratory Information Management System (LIMS) with the ability to schedule samples, generate reports, and query data. The purpose of this paper is to give an overview of the SRS environmental monitoring program, describe the development of EMCAP software and hardware, discuss the different software modules, show how EMCAP improved the Environmental Monitoring Section program, and examine the future of EMCAP at SRS.

  8. An overview of the Environmental Monitoring Computer Automation Project

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, S.M.; Lorenz, R.

    1992-12-31

    The Savannah River Site (SRS) was bulk to produce plutonium and tritium for national defense. As a result of site operations, routine and accidental releases of radionuclides have occurred. The effects these releases have on the k>cal population and environment are of concern to the Department of Energy (DOE) and SRS personnel. Each year, approximately 40,000 environmental samples are collected. The quality of the samples, analytical methods and results obtained are important to site personnel. The Environmental Monitoring Computer Automation Project (EMCAP) was developed to better manage scheduling, log-in, tracking, analytical results, and report generation. EMCAP can be viewed as a custom Laboratory Information Management System (LIMS) with the ability to schedule samples, generate reports, and query data. The purpose of this paper is to give an overview of the SRS environmental monitoring program, describe the development of EMCAP software and hardware, discuss the different software modules, show how EMCAP improved the Environmental Monitoring Section program, and examine the future of EMCAP at SRS.

  9. Standards for documenting and monitoring bird reintroduction projects

    Science.gov (United States)

    Sutherland, W.J.; Armstrong, D.; Butchart, S.H.M.; Earnhardt, J.M.; Ewen, J.; Jamieson, I.; Jones, C.G.; Lee, R.; Newbery, P.; Nichols, J.D.; Parker, K.A.; Sarrazin, F.; Seddon, P.J.; Shah, N.; Tatayah, V.

    2010-01-01

    It would be much easier to assess the effectiveness of different reintroduction methods, and so improve the success of reintroductions, if there was greater standardization in documentation of the methods and outcomes. We suggest a series of standards for documenting and monitoring the methods and outcomes associated with reintroduction projects for birds. Key suggestions are: documenting the planned release before it occurs, specifying the information required on each release, postrelease monitoring occurring at standard intervals of 1 and 5 years (and 10 for long-lived species), carrying out a population estimate unless impractical, distinguishing restocked and existing individuals when supplementing populations, and documenting the results. We suggest these principles would apply, largely unchanged, to other vertebrate classes. Similar methods could be adopted for invertebrates and plants with appropriate modification. We suggest that organizations publically state whether they will adopt these approaches when undertaking reintroductions. Similar standardization would be beneficial for a wide range of topics in environmental monitoring, ecological studies, and practical conservation. ??2010 Wiley Periodicals, Inc.

  10. Passive and Active Monitoring on a High Performance Research Network.

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Warren

    2001-05-01

    The bold network challenges described in ''Internet End-to-end Performance Monitoring for the High Energy and Nuclear Physics Community'' presented at PAM 2000 have been tackled by the intrepid administrators and engineers providing the network services. After less than a year, the BaBar collaboration has collected almost 100 million particle collision events in a database approaching 165TB (Tera=10{sup 12}). Around 20TB has been exported via the Internet to the BaBar regional center at IN2P3 in Lyon, France, for processing and around 40 TB of simulated events have been imported to SLAC from Lawrence Livermore National Laboratory (LLNL). An unforseen challenge has arisen due to recent events and highlighted security concerns at DoE funded labs. New rules and regulations suggest it is only a matter of time before many active performance measurements may not be possible between many sites. Yet, at the same time, the importance of understanding every aspect of the network and eradicating packet loss for high throughput data transfers has become apparent. Work at SLAC to employ passive monitoring using netflow and OC3MON is underway and techniques to supplement and possibly replace the active measurements are being considered. This paper will detail the special needs and traffic characterization of a remarkable research project, and how the networking hurdles have been resolved (or not!) to achieve the required high data throughput. Results from active and passive measurements will be compared, and methods for achieving high throughput and the effect on the network will be assessed along with tools that directly measure throughput and applications used to actually transfer data.

  11. Grid Environment for On-line Application Monitoring and Performance Analysis

    Directory of Open Access Journals (Sweden)

    Bartosz Baliś

    2004-01-01

    Full Text Available This paper presents an application monitoring infrastructure developed within the CrossGrid project. The software is aimed at enabling performance measurements for the application developer and in this way facilitating the development of applications in the Grid environment. The application monitoring infrastructure is composed of a distributed monitoring system, the OCM-G, and a performance analysis tool called G-PM. The OCM-G is an on-line, grid-enabled, monitoring system, while G-PM is an advanced graphical tool which allows to evaluate and present the results of performance monitoring, to support optimization of the application execution. G-PM supports build-in standard metrics and user-defined metrics expressed in the Performance Measurement Specification Language (PMSL. Communication between the G-PM and the OCM-G is performed according to a well-defined protocol, OMIS (On-line Monitoring Interface Specification. In this paper, the architecture and features of the OCM-G and G-PM are described as well as an example of use of the monitoring infrastructure to visualize the status and communication in the application, to evaluate the performance, including discovering the reason of the performance flaw.

  12. Computer monitoring and optimization of the steam boiler performance

    OpenAIRE

    Sobota Tomasz

    2017-01-01

    The paper presents a method for determination of thermo-flow parameters for steam boilers. This method allows to perform the calculations of the boiler furnace chamber and heat flow rates absorbed by superheater stages. These parameters are important for monitoring the performance of the power unit. Knowledge of these parameters allows determining the degree of the furnace chamber slagging. The calculation can be performed in online mode and use to monitoring of steam boiler. The presented me...

  13. Expected Performance of the GLAST Burst Monitor

    Science.gov (United States)

    Meegan, Charles; Fishman, Gerald; Kouveliotou, Chryssa; Wilson-Hodge, Colleen; Paciesas, William; Preece, Robert; Briggs, Michael; Bhat, Narayana; Connaughton, Valerie; Greiner, Jochen; vonKienlin, Andreas; Diehl, Roland; Steinle, Helmut; Bissaldi, Elisabetta; Kippen, R. Marc

    2007-01-01

    The GLAST Burst Monitor (GBM) will enhance LAT observations of GRBs by extending the spectral coverage from the LAT threshold down to approx. 8 kev, and will provide a trigger for re-orienting the spacecraft to observe delayed emission from selected bursts outside the LAT field of view. GBM consists of twelve NaI scintillation detectors operating in the 8 kev to 1 MeV energy range and two BGO scintillation detectors operating in the 150 keV to 30 MeV energy range. Detector resolution, effective area, and angular response have been determined by calibrations. Analyses indicate that the on-board burst threshold will be approx. 0.7 photon/cm2/s and the on-board burst localization accuracy will typically be better than 8 degrees.

  14. ATLAS Offline Software Performance Monitoring and Optimization

    CERN Document Server

    Chauhan, N; Kittelmann, T; Langenberg, R; Mandrysch , R; Salzburger, A; Seuster, R; Ritsch, E; Stewart, G; van Eldik, N; Vitillo, R

    2014-01-01

    In a complex multi-developer, multi-package software environment, such as the ATLAS offline Athena framework, tracking the performance of the code can be a non-trivial task in itself. In this paper we describe improvements in the instrumentation of ATLAS offline software that have given considerable insight into the performance of the code and helped to guide optimisation. Code can be instrumented firstly using the PAPI tool, which is a programing interface for accessing hardware performance counters. PAPI events can count floating point operations, cycles and instructions and cache accesses. Triggering PAPI to start/stop counting for each algorithm and processed event gives a good understanding of the whole algorithm level performance of ATLAS code. Further data can be obtained using pin, a dynamic binary instrumentation tool. Pintools can be used to obtain similar statistics as PAPI, but advantageously without requiring recompilation of the code. Fine grained routine and instruction level instrumentation is...

  15. ATLAS Offline Software Performance Monitoring and Optimization

    CERN Document Server

    Chauhan, N; The ATLAS collaboration; Kittelmann, T; Langenberg, R; Mandrysch , R; Salzburger, A; Seuster, R; Ritsch, E; Stewart, G; van Eldik, N; Vitillo, R

    2013-01-01

    In a complex multi-developer, multi-package software environment, such as the ATLAS offline Athena framework, tracking the performance of the code can be a non-trivial task in itself. In this paper we describe improvements in the instrumentation of ATLAS offline software that have given considerable insight into the performance of the code and helped to guide optimisation. Code can be instrumented firstly using the PAPI tool, which is a programing interface for accessing hardware performance counters. PAPI events can count floating point operations, cycles and instructions and cache accesses. Triggering PAPI to start/stop counting for each algorithm and processed event gives a good understanding of the whole algorithm level performance of ATLAS code. Further data can be obtained using pin, a dynamic binary instrumentation tool. Pintools can be used to obtain similar statistics as PAPI, but advantageously without requiring recompilation of the code. Fine grained routine and instruction level instrumentation is...

  16. Daily-life tele-monitoring of motor performance in stroke survivors

    NARCIS (Netherlands)

    Veltink, Petrus H.; van Meulen, Fokke; van Beijnum, Bernhard J.F.; Klaassen, Bart; Hermens, Hermanus J.; Droog, Adriaan; Weusthof, Marcel H.H.; Lorussi, F.; Tognetti, A.; Reenalda, J.; Reenalda, Jasper; Nikamp, C.D.M.; Nikamp-Simons, Corien Diana Maria; Baten, Christian T.M.; Buurke, Jaap; Held, J.; Luft, A.; Luinge, H.; De Toma, G.; Mancuso, C.; Paradiso, R.; Aminian, Kamiar

    2014-01-01

    The objective of the EU project INTERACTION is to develop an unobtrusive and modular sensing system for objective monitoring of daily-life motor performance of stroke survivors. This will enable clinical professionals to advise their patients about their continued daily-life activity profile and

  17. Performance of Network and Service Monitoring Frameworks

    CERN Document Server

    Lahmadi, Abdelkader; Festor, Olivier

    2009-01-01

    The efficiency and the performance of anagement systems is becoming a hot research topic within the networks and services management community. This concern is due to the new challenges of large scale managed systems, where the management plane is integrated within the functional plane and where management activities have to carry accurate and up-to-date information. We defined a set of primary and secondary metrics to measure the performance of a management approach. Secondary metrics are derived from the primary ones and quantifies mainly the efficiency, the scalability and the impact of management activities. To validate our proposals, we have designed and developed a benchmarking platform dedicated to the measurement of the performance of a JMX manager-agent based management system. The second part of our work deals with the collection of measurement data sets from our JMX benchmarking platform. We mainly studied the effect of both load and the number of agents on the scalability, the impact of management...

  18. 7 CFR 634.50 - Program and project monitoring and evaluation.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Program and project monitoring and evaluation. 634.50... Evaluation § 634.50 Program and project monitoring and evaluation. (a) Comprehensive USDA/EPA joint water... and for general RCWP program management. (2) Monitoring, evaluation, and analysis is a joint...

  19. Development of advanced monitoring methods to improve boiler availability and performance

    Energy Technology Data Exchange (ETDEWEB)

    Leino, T.; Kaerki, J.; Vainikka, P. (and others) [VTT, Jyvaskyla (Finland)

    2008-07-01

    Development of on-line monitoring tools is a key activity in the supervision, diagnosis and control of the impact of ash fouling on the efficiency and operation of large co-fired boilers. These monitoring tools have to be based both on the design of new measurement practices an don the mathematical modelling of the physical processes, aiming at the accurate determination of the deposition rates. The ADMONI-project aim was to develop on-line calculation methods for plant performance monitoring. The project focused on the design of a new pilot and power plant scale deposition probes, the execution of co-firing tests in experimental rigs and on the power plants and the development of monitoring tools to detect fouling rates both under pilot and full-scale perspectives. 43 refs., 142 figs., 13 tabs.

  20. Power monitoring and control for large scale projects: SKA, a case study

    Science.gov (United States)

    Barbosa, Domingos; Barraca, João. Paulo; Maia, Dalmiro; Carvalho, Bruno; Vieira, Jorge; Swart, Paul; Le Roux, Gerhard; Natarajan, Swaminathan; van Ardenne, Arnold; Seca, Luis

    2016-07-01

    Large sensor-based science infrastructures for radio astronomy like the SKA will be among the most intensive datadriven projects in the world, facing very high demanding computation, storage, management, and above all power demands. The geographically wide distribution of the SKA and its associated processing requirements in the form of tailored High Performance Computing (HPC) facilities, require a Greener approach towards the Information and Communications Technologies (ICT) adopted for the data processing to enable operational compliance to potentially strict power budgets. Addressing the reduction of electricity costs, improve system power monitoring and the generation and management of electricity at system level is paramount to avoid future inefficiencies and higher costs and enable fulfillments of Key Science Cases. Here we outline major characteristics and innovation approaches to address power efficiency and long-term power sustainability for radio astronomy projects, focusing on Green ICT for science and Smart power monitoring and control.

  1. Safety KPIs - Monitoring of safety performance

    Directory of Open Access Journals (Sweden)

    Andrej Lališ

    2014-09-01

    Full Text Available This paper aims to provide brief overview of aviation safety development focusing on modern trends represented by implementation of Safety Key Performance Indicators. Even though aviation is perceived as safe means of transport, it is still struggling with its complexity given by long-term growth and robustness which it has reached today. Thus nowadays safety issues are much more complex and harder to handle than ever before. We are more and more concerned about organizational factors and control mechanisms which have potential to further increase level of aviation safety. Within this paper we will not only introduce the concept of Key Performance Indicators in area of aviation safety as an efficient control mechanism, but also analyse available legislation and documentation. Finally we will propose complex set of indicators which could be applied to Czech Air Navigation Service Provider.

  2. The Monitor project: Searching for occultations in young open clusters

    CERN Document Server

    Aigrain, S; Irwin, J; Hebb, L; Irwin, M; Favata, F; Moraux, E; Pont, F; Aigrain, Suzanne; Hodgkin, Simon; Irwin, Jonathan; Hebb, Leslie; Irwin, Mike; Favata, Fabio; Moraux, Estelle; Pont, Frederic

    2006-01-01

    The Monitor project is a photometric monitoring survey of nine young (1-200Myr) clusters in the solar neighbourhood to search for eclipses by very low mass stars and brown dwarfs and for planetary transits in the light curves of cluster members. It began in the autumn of 2004 and uses several 2 to 4m telescopes worldwide. We aim to calibrate the relation between age, mass, radius and where possible luminosity, from the K-dwarf to the planet regime, in an age range where constraints on evolutionary models are currently very scarce. Any detection of an exoplanet in one of our youngest targets (<=10Myr) would also provide important constraints on planet formation and migration timescales and their relation to proto-planetary disc lifetimes. Finally, we will use the light curves of cluster members to study rotation and flaring in low-mass pre-main sequence stars. The present paper details the motivation, science goals and observing strategy of the survey. We present a method to estimate the sensitivity and num...

  3. TAUOVERSUPERMON: LOW-OVERHEAD ONLINE PARALLEL PERFORMANCE MONITORING

    Energy Technology Data Exchange (ETDEWEB)

    SOTTILE, MATTHEW JOSEPH [Los Alamos National Laboratory; NATARAJ, AROON [Los Alamos National Laboratory; MALONY, ALLEN [Los Alamos National Laboratory; MORRIS, ALAN [Los Alamos National Laboratory; SHENDE, SAMEER [Los Alamos National Laboratory

    2007-01-30

    Online or Real-time application performance monitoring allows tracking performance characteristics during execution as opposed to doing so post-mortem. This opens up several possibilities otherwise unavailable such as real-time visualization and application performance steering that can be useful in the context of long-running applications. Two fundamental components that constitute such a performance monitor are the measurement and transport systems. The former captures performance metrics of individual contexts (processes, threads). The latter enables querying the parallel/distributed state from the different contexts and also allows measurement control. As HPC systems grow in size and complexity, the key challenge is to keep the online performance monitor scalable and low overhead while still providing a useful performance reporting capability. We adapt and combine two existing, mature systems - Tuning and Analysis Utility (TAU) and Supermon - to address this problem. Tau performs the measurement while Supermon is used to collect the distributed measurement state. Our experiments show that this novel approach of using a cluster-monitor, Supermon, as the transport for online performance data from Tau leads to very low-overhead application monitoring as well as other beneits unavailable from using a traditional transport such as NFS.

  4. REDD+ readiness: early insights on monitoring, reporting and verification systems of project developers

    Science.gov (United States)

    Joseph, Shijo; Herold, Martin; Sunderlin, William D.; Verchot, Louis V.

    2013-09-01

    A functional measuring, monitoring, reporting and verification (MRV) system is essential to assess the additionality and impact on forest carbon in REDD+ (reducing emissions from deforestation and degradation) projects. This study assesses the MRV capacity and readiness of project developers at 20 REDD+ projects in Brazil, Peru, Cameroon, Tanzania, Indonesia and Vietnam, using a questionnaire survey and field visits. Nineteen performance criteria with 76 indicators were formulated in three categories, and capacity was measured with respect to each category. Of the 20 projects, 11 were found to have very high or high overall MRV capacity and readiness. At the regional level, capacity and readiness tended to be highest in the projects in Brazil and Peru and somewhat lower in Cameroon, Tanzania, Indonesia and Vietnam. Although the MRV capacities of half the projects are high, there are capacity deficiencies in other projects that are a source of concern. These are not only due to limitations in technical expertise, but can also be attributed to the slowness of international REDD+ policy formulation and the unclear path of development of the forest carbon market. Based on the study results, priorities for MRV development and increased investment in readiness are proposed.

  5. Improving Sustainability Performance for Public-Private-Partnership (PPP Projects

    Directory of Open Access Journals (Sweden)

    Liyin Shen

    2016-03-01

    Full Text Available Improving sustainability performance in developing infrastructure projects is an important strategy for pursuing the mission of sustainable development. In recent years, the business model of public-private-partnership (PPP is promoted as an effective approach in developing infrastructure projects. It is considered that the distribution of the contribution on project investment between private and public sectors is one of the key variables affecting sustainability performance of PPP-type projects. This paper examines the impacts of the contribution distribution between public and private sectors on project sustainability performance. A model named the sustainability performance-based evaluation model (SPbEM is developed for assisting the assessment of the level of sustainability performance of PPP projects. The study examines the possibility of achieving better sustainability through proper arrangement of the investment distribution between the two primary sectors in developing PPP-type infrastructure projects.

  6. Near-surface monitoring for the ZERT shallow CO2 injection project

    Energy Technology Data Exchange (ETDEWEB)

    Strazisar, Brian R. [National Energy Technology Lab. (NETL), Pittsburgh, PA, (United States); Wells, Arthur W. [National Energy Technology Lab. (NETL), Pittsburgh, PA, (United States); Diehl, J. Rodney [National Energy Technology Lab. (NETL), Pittsburgh, PA, (United States); Hammack, Richard W. [National Energy Technology Lab. (NETL), Pittsburgh, PA, (United States); Veloski, Garret A. [National Energy Technology Lab. (NETL), Pittsburgh, PA, (United States)

    2009-12-01

    As part of a collaborative effort operated by the Zero Emission Research and Technology Center (ZERT), a series of two shallow releases of CO2 Was performed at a test site in Bozeman, MT. The purpose of the experiment was to simulate possible leakage scenarios from a carbon capture and storage operation in order to further develop and verify monitoring technologies used to characterize and quantify the release of CO2. The project included collaboration with several research groups and organizations. Presented here are the results of soil-gas monitoring conducted by researchers from the National Energy Technology Laboratory, including CO2 flux measurement, soil-gas analysis, perfluorocarbon tracer monitoring, and soil resistivity measurements. Together, these methods proved to be effective in detecting and characterizing leakage in the near-surface.

  7. Optical Performance Monitoring using Proactive Monitoring and the Time Caliper Method

    Science.gov (United States)

    Luk, Hon Tung

    The widespread real time multimedia applications generate increasing demands of data transmission capacity nowadays. Fiber-optic communication is the core technology to meet the capacity requirements of the fast growing internet data and to support the long haul transmission with low cost. Reliability is a key issue for high data rate transmission systems because the interruption of connection may result in substantial amount of data lost. Performance monitoring is essential for maintaining reliability by keeping track of the network status rapidly. In this thesis, we will investigate two aspects of performance monitoring in optical communication systems: network-based monitoring and link-based physical layer monitoring. In the case of network-based monitoring, proactive monitoring is used to reduce the acquisition time to obtain the monitoring information. The monitoring process is modeled as a Markov Decision Process. We propose nine different monitoring schemes and show that the scheme with increasing probing number and probing unpopular edge first has the best overall performance, regarding to coverage of monitoring links and blocking probability. On the other hand, if we would like to reduce the cost for proactive monitoring, the shortest path probing scheme is the optimal monitoring schemes when the monitoring paths are probed independently. In addition, if we consider the cases of edge overlapping and node overlapping of the monitoring paths, the overlapping probing scheme may require less number of hops during the monitoring process. Formulas have been derived for checking the conditions when the overlapping probing scheme can be applied. Simulations are performed under different optical network topologies and conditions to evaluate the performance of the schemes. Measurement of relative delay facilitates various monitoring and compensation applications, such as synchronization of subchannels in multiplexing systems, dispersion measurement. In the case of

  8. Modern Techniques and Technologies Applied to Training and Performance Monitoring.

    Science.gov (United States)

    Sands, William A; Kavanaugh, Ashley A; Murray, Steven R; McNeal, Jeni R; Jemni, Monèm

    2016-12-05

    Athlete preparation and performance continues to increase in complexity and costs. Modern coaches are shifting from reliance on personal memory, experience, and opinion to evidence from collected training load data. Training load monitoring may hold vital information for developing systems of monitoring that follow the training process with such precision that both performance prediction and day-to-day management of training become an adjunct to preparation and performance. Time series data collection and analyses in sport are still in their infancy with considerable efforts being applied in "big-data" analytics and models of the appropriate variables to monitor and methods for doing so. Training monitoring has already garnered important applications, but lacks a theoretical framework from which to develop further. As such, we propose a framework involving the following: analyses of individuals, trend analyses, rules-based analysis, and statistical process control.

  9. Stereo Vision for SPHERES-based Navigation and Monitoring Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Maintenance operations and scientific research on the International Space Station (ISS) require active monitoring. Currently the majority of monitoring and recording...

  10. Biodiversity monitoring in Europe: the EU FP7 EBONE project. European biodiversity observation NEtwork

    CSIR Research Space (South Africa)

    Lück-Vogel, Melanie

    2008-09-01

    Full Text Available submission Presentation Poster presentation A) Title Biodiversity Monitoring in Europe: The EU FP7 EBONE project European Biodiversity Observation NEtwork B) Short title EBONE - European Biodiversity Observation NEtwork C) Author(s) Vogel, M. (1..., South Africa F) Biodiversity Monitoring in Europe: The EU FP7 EBONE project European Biodiversity Observation NEtwork On April 1st, 2008 the EU FP7 project EBONE (http://www.ebone.wur.nl/) was launched. The aim of the project...

  11. Project 57 Air Monitoring Report: October 1, 2013, through December 31, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Mizell, Steve A. [Desert Research Inst. (DRI), Las Vegas, NV (United States); Nikolich, George [Desert Research Inst. (DRI), Las Vegas, NV (United States); McCurdy, Greg [Desert Research Inst. (DRI), Reno, NV (United States); Shadel, Craig [Desert Research Inst. (DRI), Las Vegas, NV (United States); Miller, Julianne J. [Desert Research Inst. (DRI), Las Vegas, NV (United States)

    2016-02-01

    On April 24, 1957, the Atomic Energy Commission (AEC, now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley north east of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DoD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a nonnuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DoD. Various radiological surveys have been performed in the area and in 2007, the DOE expanded the demarked contamination area by posting signs 200 to 400 feet (60 to 120 meters) outside of the original fence. Plutonium in soil is thought to attach preferentially to smaller particles. Therefore, redistribution of soil particulates by wind (dust) is the mechanism most likely to transport plutonium beyond the boundary of the Project 57 contamination area. In 2011, DRI installed two instrumentation towers to measure radiological, meteorological, and dust conditions. The monitoring activity was implemented to determine if radionuclide contamination was detectable in samples of airborne dust and characterize meteorological and environmental parameters that influence dust transport. Collected data also permits comparison of radiological conditions at the Project 57 monitoring stations to conditions observed at Community Environmental Monitoring Program (CEMP) stations around the NTTR. Biweekly samples of airborne particulates are submitted for laboratory

  12. Project 57 Air Monitoring Report: October 1, 2013, through December 31, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Mizell, Steve A. [Desert Research Inst. (DRI), Las Vegas, NV (United States); Nikolich, George [Desert Research Inst. (DRI), Las Vegas, NV (United States); McCurdy, Greg [Desert Research Inst. (DRI), Reno, NV (United States); Shadel, Craig [Desert Research Inst. (DRI), Las Vegas, NV (United States); Miller, Julianne J. [Desert Research Inst. (DRI), Las Vegas, NV (United States)

    2016-02-01

    On April 24, 1957, the Atomic Energy Commission (AEC, now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley north east of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DoD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a nonnuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DoD. Various radiological surveys have been performed in the area and in 2007, the DOE expanded the demarked contamination area by posting signs 200 to 400 feet (60 to 120 meters) outside of the original fence. Plutonium in soil is thought to attach preferentially to smaller particles. Therefore, redistribution of soil particulates by wind (dust) is the mechanism most likely to transport plutonium beyond the boundary of the Project 57 contamination area. In 2011, DRI installed two instrumentation towers to measure radiological, meteorological, and dust conditions. The monitoring activity was implemented to determine if radionuclide contamination was detectable in samples of airborne dust and characterize meteorological and environmental parameters that influence dust transport. Collected data also permits comparison of radiological conditions at the Project 57 monitoring stations to conditions observed at Community Environmental Monitoring Program (CEMP) stations around the NTTR. Biweekly samples of airborne particulates are submitted for laboratory

  13. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  14. Performance evaluation of quality monitor models in spot welding

    Institute of Scientific and Technical Information of China (English)

    Zhang Zhongdian; Li Dongqing; Wang Kai

    2005-01-01

    Performance of quality monitor models in spot welding determines the monitor precision directly, so it's crucial to evaluate it. Previously, mean square error ( MSE ) is often used to evaluate performances of models, but it can only show the total errors of finite specimens of models, and cannot show whether the quality information inferred from models are accurate and reliable enough or not. For this reason, by means of measure error theory, a new way to evaluate the performances of models according to the error distributions is developed as follows: Only if correct and precise enough the error distribution of model is, the quality information inferred from model is accurate and reliable.

  15. 38 CFR 43.40 - Monitoring and reporting program performance.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Monitoring and reporting program performance. 43.40 Section 43.40 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... Status Report. (1) Grantees shall submit annual performance reports unless the awarding agency...

  16. Emergency monitoring strategy and radiation measurements document of the NKS project emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD)

    Energy Technology Data Exchange (ETDEWEB)

    Lahtinen, J. [Radiation and Nuclear Safety Authority (STUK) (Finland)

    2006-04-15

    This report is one of the deliverables of the NKS Project Emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD) (20022005). The project and the overall results are briefly described in the NKS publication 'Emergency Management and Radiation Monitoring in Nuclear and Radiological Accidents. Summary Report on the NKS Project EMARAD' (NKS-137, April 2006). In a nuclear or radiological emergency, all radiation measurements must be performed efficiently and the results interpreted correctly in order to provide the decision-makers with adequate data needed in analysing the situation and carrying out countermeasures. Managing measurements in different situations in a proper way requires the existence of pre-prepared emergency monitoring strategies. Preparing a comprehensive yet versatile strategy is not an easy task to perform because there are lots of different factors that have to be taken into account. The primary objective of this study was to discuss the general problematics concerning emergency monitoring strategies and to describe a few important features of an efficient emergency monitoring system as well as factors affecting measurement activities in practise. Some information concerning the current situation in the Nordic countries has also been included. (au)

  17. Emergency monitoring strategy and radiation measurements document of the NKS project emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD)

    Energy Technology Data Exchange (ETDEWEB)

    Lahtinen, J. [Radiation and Nuclear Safety Authority (STUK) (Finland)

    2006-04-15

    This report is one of the deliverables of the NKS Project Emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD) (20022005). The project and the overall results are briefly described in the NKS publication 'Emergency Management and Radiation Monitoring in Nuclear and Radiological Accidents. Summary Report on the NKS Project EMARAD' (NKS-137, April 2006). In a nuclear or radiological emergency, all radiation measurements must be performed efficiently and the results interpreted correctly in order to provide the decision-makers with adequate data needed in analysing the situation and carrying out countermeasures. Managing measurements in different situations in a proper way requires the existence of pre-prepared emergency monitoring strategies. Preparing a comprehensive yet versatile strategy is not an easy task to perform because there are lots of different factors that have to be taken into account. The primary objective of this study was to discuss the general problematics concerning emergency monitoring strategies and to describe a few important features of an efficient emergency monitoring system as well as factors affecting measurement activities in practise. Some information concerning the current situation in the Nordic countries has also been included. (au)

  18. Community air monitoring and the Village Green Project ...

    Science.gov (United States)

    Cost and logistics are practical issues that have historically constrained the number of locations where long-term, active air pollution measurement is possible. In addition, traditional air monitoring approaches are generally conducted by technical experts with limited engagement with community members. EPA’s Village Green Project (VGP) is a prototype technology designed to add value to a community environment – VGP is a park bench equipped with air and meteorological instruments that measure ozone, fine particles, wind, temperature, and humidity at a one-minute time resolution, with the open-source Arduino microprocessor operating as the system controller. The data are streamed wirelessly to a database, passed through automatic diagnostic quality checks, and then made publically available on an engaging website. The station was designed to minimize power use; it consumes an estimated 15W and operates entirely on solar power, is engineered to run for several days with minimal solar radiation, and is capable of automatically shutting down components of the system to conserve power and restarting when power availability increases. Situated outside a public library in Durham, North Carolina, VGP has also been a gathering location for air quality experts to engage with community members. During the time span of June, 2013 through January, 2014, the station collected about 3500 hours of ozone and PM2.5 data, with over 90% up-time operating only on solar po

  19. Monitoring and calibration of the ALICE time projection chamber

    CERN Document Server

    Larsen, Dag Toppe

    The aim of the A Large Ion Collider Experiment (ALICE) experiment at CERN is to study the properties of the Quark–Gluon Plasma (QGP). With energies up to 5.5 A T eV for Pb+Pb collisions, the Large Hadron Collider (LHC) sets a new benchmark for heavy- ion collisions, and opens the door to a so far unexplored energy domain. A closer look at some of the physics topics of ALICE is given in Chapter 1. ALICE consists of several sub-detectors and other sub-systems. The various sub- detectors are designed for exploring different aspects of the particle production of an heavy-ion collision. Chapter 2 gives some insight into the design. The main tracking detector is the Time Projection Chamber (TPC). It has more than half million read-out channels, divided into 216 Read-out Partitions (RPs). Each RP is a separate Front-End Electronics (FEE) entity, as described in Chapter 3. A complex Detector Control System (DCS) is needed for configuration, monitoring and control. The heart of it on the RP side is a small embedded ...

  20. Statistical process control methods for expert system performance monitoring.

    Science.gov (United States)

    Kahn, M G; Bailey, T C; Steib, S A; Fraser, V J; Dunagan, W C

    1996-01-01

    The literature on the performance evaluation of medical expert system is extensive, yet most of the techniques used in the early stages of system development are inappropriate for deployed expert systems. Because extensive clinical and informatics expertise and resources are required to perform evaluations, efficient yet effective methods of monitoring performance during the long-term maintenance phase of the expert system life cycle must be devised. Statistical process control techniques provide a well-established methodology that can be used to define policies and procedures for continuous, concurrent performance evaluation. Although the field of statistical process control has been developed for monitoring industrial processes, its tools, techniques, and theory are easily transferred to the evaluation of expert systems. Statistical process tools provide convenient visual methods and heuristic guidelines for detecting meaningful changes in expert system performance. The underlying statistical theory provides estimates of the detection capabilities of alternative evaluation strategies. This paper describes a set of statistical process control tools that can be used to monitor the performance of a number of deployed medical expert systems. It describes how p-charts are used in practice to monitor the GermWatcher expert system. The case volume and error rate of GermWatcher are then used to demonstrate how different inspection strategies would perform.

  1. Understanding new product project performance : A meta-analysis

    NARCIS (Netherlands)

    Commandeur, H.R.; Pattikawa, L.H.; Verwaal, E.

    2006-01-01

    Purpose: The purpose of this paper is to summarize the accumulated body of knowledge on the performance of new product projects and provide directions for further research. Design/methodology/approach: Using a refined classification of antecedents of new product project performance the research resu

  2. Understanding new product project performance : A meta-analysis

    NARCIS (Netherlands)

    Commandeur, H.R.; Pattikawa, L.H.; Verwaal, E.

    2006-01-01

    Purpose: The purpose of this paper is to summarize the accumulated body of knowledge on the performance of new product projects and provide directions for further research. Design/methodology/approach: Using a refined classification of antecedents of new product project performance the research

  3. Final performance report for Project JEM

    Energy Technology Data Exchange (ETDEWEB)

    McKinney, M.J.; Jenkins, S.

    1997-12-31

    Project JEM (Jarvis Enhancement of Males) is a pre-college program directed toward stimulating disadvantaged, talented African American males in grades four, five, and six to attend college and major in mathematics, science, computer science, or related technical areas needed by the US Department of Energy. Twenty young African American male students were recruited from Gladewater Independent School District (ISD), Longview ISD, Hawkins ISD, Tyler ISD, Winona ISD and big Sandy ISD. Students enrolled in the program range from ages 10 to 13 and are in grades four, five and six. Student participants in the 1997 Project JEM Program attended Saturday Academy sessions and a four week intensive, summer residential program. The information here provides a synopsis of the activities which were conducted through each program component.

  4. MCA Based Performance Evaluation of Project Selection

    CERN Document Server

    Bakshi, Tuli

    2011-01-01

    Multi-criteria decision support systems are used in various fields of human activities. In every alternative multi-criteria decision making problem can be represented by a set of properties or constraints. The properties can be qualitative & quantitative. For measurement of these properties, there are different unit, as well as there are different optimization techniques. Depending upon the desired goal, the normalization aims for obtaining reference scales of values of these properties. This paper deals with a new additive ratio assessment method. In order to make the appropriate decision and to make a proper comparison among the available alternatives Analytic Hierarchy Process (AHP) and ARAS have been used. The uses of AHP is for analysis the structure of the project selection problem and to assign the weights of the properties and the ARAS method is used to obtain the final ranking and select the best one among the projects. To illustrate the above mention methods survey data on the expansion of optic...

  5. Optical Performance Monitoring and Signal Optimization in Optical Networks

    DEFF Research Database (Denmark)

    Petersen, Martin Nordal

    2006-01-01

    -optical-electrical regeneration points decreases. This thesis evaluates the impact of signal degrading effects that are becoming of increasing concern in all-optical high-speed networks due to all-optical switching and higher bit-rates. Especially group-velocity-dispersion (GVD) and a number of nonlinear effects will require......The thesis studies performance monitoring for the next generation optical networks. The focus is on all-optical networks with bit-rates of 10 Gb/s or above. Next generation all-optical networks offer large challenges as the optical transmitted distance increases and the occurrence of electrical...... enhanced attention to avoid signal degradations. The requirements for optical performance monitoring features are discussed, and the thesis evaluates the advantages and necessity of increasing the level of performance monitoring parameters in the physical layer. In particular, methods for optical...

  6. Inventory of current environmental monitoring projects in the US-Canadian transboundary region

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; Ballinger, M.Y.; Chapman, E.G.

    1986-05-01

    This document presents the results of a study commissioned to survey and summarize major environmental monitoring projects in the US-Canadian transboundary region. Projects with field sites located within 400 km (250 mi) of the border and active after 1980 were reviewed. The types of projects included: ambient air-quality monitoring, ambient water-quality monitoring, deposition monitoring, forest/vegetation monitoring and research, soil studies, and ecosystem studies. Ecosystem studies included projects involving the measurement of parameters from more than one monitoring category (e.g., studies that measured both water and soil chemistry). Individual descriptions were formulated for 184 projects meeting the spatial and temporal criteria. Descriptions included the official title for the project, its common abbreviation, program emphasis, monitoring site locations, time period conducted, parameters measured, protocols employed, frequency of sample collection, data storage information, and the principal contact for the project. A summary inventory subdivided according to the six monitoring categories was prepared using a computerized data management system. Information on major centralized data bases in the field of environmental monitoring was also obtained, and summary descriptions were prepared. The inventory and data base descriptions are presented in appendices to this document.

  7. Mindful awareness of feelings increases neural performance monitoring.

    Science.gov (United States)

    Saunders, Blair; Rodrigo, Achala H; Inzlicht, Michael

    2016-02-01

    Mindfulness has been associated with enhanced performance monitoring; however, little is known about the processes driving this apparent neurocognitive benefit. Here, we tested whether focusing present-moment awareness toward the nonjudgmental experience of emotion facilitates rapid neural responses to negative performance outcomes (i.e., mistakes). In particular, we compared whether directing present-moment awareness toward emotions or thoughts would enhance the neurophysiological correlates of performance monitoring: the error-related negativity (ERN) and the error positivity (Pe). Participants were randomly assigned to either a thought-focused or an emotion-focused group, and first they completed a preinduction go/no-go task. Subsequently, the groups followed inductions that promoted mindful attention toward either thoughts or emotions, before completing a final postinduction go/no-go session. The results indicated that emotion-focused participants demonstrated higher neural sensitivity to errors in the time course of the ERN, whereas focusing on thoughts had no effect on performance monitoring. In contrast, neither induction procedure altered the amplitude of the later Pe component. Although our manipulations also induced changes in behavior, the ERN effects remained significant after controlling for performance. Thus, our results suggest that mindfulness meditation boosts early neural performance monitoring (ERN amplitude), specifically through meditation's influence on affective processing.

  8. Fast Flux Test Facility Performance Monitoring Management Information August 1989

    Energy Technology Data Exchange (ETDEWEB)

    Newland, D J

    1989-09-01

    The purpose of this report is to provide management with performance data on key performance indicators selected from the FFTF Early Warning System performance indicators. This report contains the results for key performance indicators divided into two categories of ``overall`` and ``other``. The ``overall`` performance indicators, when considered in the aggregate provide one means of monitoring overall plant performance. Overall performance indicators are listed in Table 1. The ``other`` performance indicators, listed in Table 2, are considered useful management tools for assessing the specific areas they address. The data should be used in conjunction with the results of other management assessment activities to focus improvement efforts. Use of these key performance indicators as a group is stressed, since focusing on a single indicator or a narrow set of indicators can be counterproductive both to safety and to long-term performance improvement. 27 figs., 2 tabs.

  9. Fast Flux Test Facility Performance Monitoring Management Information April 1989

    Energy Technology Data Exchange (ETDEWEB)

    Newland, D. J.

    1989-05-01

    The purpose of this report is to provide management with performance data on key performance indicators selected from the FFTF Early Warning System performance indicators. This report contains the result for key performance indicators divided into two categories of ``overall`` and ``other``. The ``overall`` performance indicators, when considered in the aggregate, provide one means of monitoring overall plant performance. Overall performance indicators are listed. The ``other`` performance indicators, are considered useful management tools for assessing the specific areas they address. The data should be used in conjunction with the results of other management assessment activities to focus improvement efforts. Use of these key performance indicators as a group is stressed, since focusing on a single indicator or a narrow set of indicators can be counterproductive both to safety and to long-term performance improvement. 26 figs., 2 tabs.

  10. Face-induced expectancies influence neural mechanisms of performance monitoring.

    Science.gov (United States)

    Osinsky, Roman; Seeger, Jennifer; Mussel, Patrick; Hewig, Johannes

    2016-04-01

    In many daily situations, the consequences of our actions are predicted by cues that are often social in nature. For instance, seeing the face of an evaluator (e.g., a supervisor at work) may activate certain evaluative expectancies, depending on the history of prior encounters with that particular person. We investigated how such face-induced expectancies influence neurocognitive functions of performance monitoring. We recorded an electroencephalogram while participants completed a time-estimation task, during which they received performance feedback from a strict and a lenient evaluator. During each trial, participants first saw the evaluator's face before performing the task and, finally, receiving feedback. Therefore, faces could be used as predictive cues for the upcoming evaluation. We analyzed electrocortical signatures of performance monitoring at the stages of cue processing, task performance, and feedback reception. Our results indicate that, at the cue stage, seeing the strict evaluator's face results in an anticipatory preparation of fronto-medial monitoring mechanisms, as reflected by a sustained negative-going amplitude shift (i.e., the contingent negative variation). At the performance stage, face-induced expectancies of a strict evaluation rule led to increases of early performance monitoring signals (i.e., frontal-midline theta power). At the final stage of feedback reception, violations of outcome expectancies differentially affected the feedback-related negativity and frontal-midline theta power, pointing to a functional dissociation between these signatures. Altogether, our results indicate that evaluative expectancies induced by face-cues lead to adjustments of internal performance monitoring mechanisms at various stages of task processing.

  11. High Performance Spaceflight Computing (HPSC) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — In 2012, the NASA Game Changing Development Program (GCDP), residing in the NASA Space Technology Mission Directorate (STMD), commissioned a High Performance...

  12. Wearable Beat to Beat Blood Pressure Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — A key component of NASA's human exploration programs is a system that monitors the health of the crew during the space missions. The wearable physiological monitor...

  13. Biomedical Monitoring by a Novel Noncontact Radio Frequency Technology Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This technology will be a quantum advance in cardiac monitoring and will be applicable in numerous situations such as for immediate assessment and monitoring of...

  14. Characterization of Electrospray Ionization for Spaceflight Water Monitoring Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Current methods for monitoring the water used on the ISS rely heavily on ground analysis of archival samples. Air monitors presently on board the ISS could be used...

  15. Status and performances of the FAZIA project

    Science.gov (United States)

    Rivet, M. F.; Bonnet, E.; Borderie, B.; Bougault, R.; Edelbruck, P.; Le Neindre, N.; Barlini, S.; Carboni, S.; Casini, G.; Rosato, E.; Tortone, G.; FAZIA Collaboration

    2013-03-01

    FAZIA is designed for detailed studies of the isospin degree of freedom, extending to the limits the isotopic identification of charged products from nuclear collisions when using silicon detectors and CsI(Tl) scintillators. We show that the FAZIA telescopes give isotopic identification up to Z~25 with a ΔE-E technique. Digital Pulse Shape Analysis makes possible elemental identification up to Z=55 and isotopic identification for Z=1-10 when using the response of a single silicon detector. The project is now in the phase of building a demonstrator comprising about 200 telescopes.

  16. Status and performances of the FAZIA project

    CERN Document Server

    Rivet, M -F; Borderie, B; Bougault, R; Edelbruck, P; Neindre, N Le; Barlini, S; Carboni, S; Casini, G; Rosato, E; Tortone, G

    2012-01-01

    FAZIA is designed for detailed studies of the isospin degree of freedom, extending to the limits the isotopic identification of charged products from nuclear collisions when using silicon detectors and CsI(Tl) scintillators. We show that the FAZIA telescopes give isotopic identification up to Z$\\sim$25 with a $\\Delta$E-E technique. Digital Pulse Shape Analysis makes possible elemental identification up to Z=55 and isotopic identification for Z=1-10 when using the response of a single silicon detector. The project is now in the phase of building a demonstrator comprising about 200 telescopes.

  17. Improvement in RUP Project Management via Service Monitoring: Best Practice of SOA

    CERN Document Server

    Saqib, Sheikh Muhammad; Hussain, Shahid; Ahmad, Bashir; Bano, Arjamand

    2010-01-01

    Management of project planning, monitoring, scheduling, estimation and risk management are critical issues faced by a project manager during development life cycle of software. In RUP, project management is considered as core discipline whose activities are carried in all phases during development of software products. On other side service monitoring is considered as best practice of SOA which leads to availability, auditing, debugging and tracing process. In this paper, authors define a strategy to incorporate the service monitoring of SOA into RUP to improve the artifacts of project management activities. Moreover, the authors define the rules to implement the features of service monitoring, which help the project manager to carry on activities in well define manner. Proposed frame work is implemented on RB (Resuming Bank) application and obtained improved results on PM (Project Management) work.

  18. High Performance Building Facade Solutions - PIER Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eleanor; Selkowitz, Stephen

    2009-12-31

    Building facades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. Facades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.This work focused on addressing significant near-term opportunities to reduce energy use in California commercial building stock by a) targeting voluntary, design-based opportunities derived from the use of better design guidelines and tools, and b) developing and deploying more efficient glazings, shading systems, daylighting systems, facade systems and integrated controls. This two-year project, supported by the California Energy Commission PIER program and the US Department of Energy, initiated a collaborative effort between The Lawrence Berkeley National Laboratory (LBNL) and major stakeholders in the facades industry to develop, evaluate, and accelerate market deployment of emerging, high-performance, integrated facade solutions. The LBNL Windows Testbed Facility acted as the primary catalyst and mediator on both sides of the building industry supply-user business transaction by a) aiding component suppliers to create and optimize cost effective, integrated systems that work, and b) demonstrating and verifying to the owner, designer, and specifier community that these integrated systems reliably deliver required energy performance. An industry consortium was initiated amongst approximately seventy disparate stakeholders, who unlike the HVAC or lighting industry, has no single representative, multi-disciplinary body or organized means of communicating and collaborating. The consortium provided guidance on the project and more importantly, began to mutually work out and agree on the goals, criteria, and pathways needed to attain the ambitious net zero energy goals defined by California and

  19. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  20. The use of energy management and control systems to monitor the energy performance of commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    Heinemeier, K E [Univ. of California, Berkeley, CA (United States). Dept. of Architecture

    1994-12-01

    Monitored data play a very important part in the implementation and evaluation of energy conservation technologies and programs. However, these data can be expensive to collect, so there is a need for lower-cost alternatives. In many situations, using the computerized Energy Management and Control Systems (EMCSs)--already installed in many buildings--to collect these commercial building performance data has advantages over more conventional methods. This method provides data without installing incremental hardware, and the large amounts of available operational data can be a very rich resource for understanding building performance. This dissertation addresses several of these issues. One specific objective is to describe a monitoring-project planning process that includes definition of objectives, constraints, resources and approaches for the monitoring. The choice of tools is an important part of this process. The dissertation goes on to demonstrate, through eight case studies, that EMCS monitoring is possible, and to identify and categorize the problems and issues that can be encountered. These issues lead to the creation, use, and testing of a set of methods for evaluation of EMCS monitoring, in the form of guidelines. Finally, EMCS monitoring is demonstrated and compared with conventional monitoring more methodically in a detailed case study.

  1. Pros-IT CNR: an Italian prostate cancer monitoring project.

    Science.gov (United States)

    Noale, Marianna; Maggi, Stefania; Artibani, Walter; Bassi, Pier Francesco; Bertoni, Filippo; Bracarda, Sergio; Conti, Giario Natale; Corvò, Renzo; Gacci, Mauro; Graziotti, Pierpaolo; Magrini, Stefano Maria; Maurizi Enrici, Riccardo; Mirone, Vincenzo; Montironi, Rodolfo; Muto, Giovanni; Pecoraro, Stefano; Porreca, Angelo; Ricardi, Umberto; Tubaro, Andrea; Zagonel, Vittorina; Zattoni, Filiberto; Crepaldi, Gaetano

    2017-04-01

    The Pros-IT CNR project aims to monitor a sample of Italian males ≥18 years of age who have been diagnosed in the participating centers with incident prostate cancer, by analyzing their clinical features, treatment protocols and outcome results in relation to quality of life. Pros-IT CNR is an observational, prospective, multicenter study. The National Research Council (CNR), Neuroscience Institute, Aging Branch (Padua) is the promoting center. Ninety-seven Italian centers located throughout Italy were involved. The field study began in September 1, 2014. Subjects eligible were diagnosed with biopsy-verified prostate cancer, naïve. A sample size of 1500 patients was contemplated. A baseline assessment including anamnestic data, clinical history, risk factors, the initial diagnosis, cancer staging information and quality of life (Italian UCLA Prostate Cancer Index; SF-12 Scale) was completed. Six months after the initial diagnosis, a second assessment evaluating the patient's health status, the treatment carried out, and the quality of life will be made. A third assessment, evaluating the treatment follow-up and the quality of life, will be made 12 months after the initial diagnosis. The 4th, 5th, 6th and 7th assessments, similar to the third, will be completed 24, 36, 48 and 60 months after the initial diagnosis, respectively, and will include also a Food Frequency Questionnaire and the Physical Activity Scale for the Elderly. The study will provide information on patients' quality of life and its variations over time in relation to the treatments received for the prostate cancer.

  2. Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Worthington, Monty [Project Director - AK

    2014-02-05

    Cook Inlet, Alaska is home to some of the greatest tidal energy resources in the U.S., as well as an endangered population of beluga whales (Delphinapterus leucas). Successfully permitting and operating a tidal power project in Cook Inlet requires a biological assessment of the potential and realized effects of the physical presence and sound footprint of tidal turbines on the distribution, relative abundance, and behavior of Cook Inlet beluga whales. ORPC Alaska, working with the Project Team—LGL Alaska Research Associates, University of Alaska Anchorage, TerraSond, and Greeneridge Science—undertook the following U.S. Department of Energy (DOE) study to characterize beluga whales in Cook Inlet – Acoustic Monitoring of Beluga Whale Interactions with the Cook Inlet Tidal Energy Project (Project). ORPC Alaska, LLC, is a wholly-owned subsidiary of Ocean Renewable Power Company, LLC, (collectively, ORPC). ORPC is a global leader in the development of hydrokinetic power systems and eco-conscious projects that harness the power of ocean and river currents to create clean, predictable renewable energy. ORPC is developing a tidal energy demonstration project in Cook Inlet at East Foreland where ORPC has a Federal Energy Regulatory Commission (FERC) preliminary permit (P-13821). The Project collected baseline data to characterize pre-deployment patterns of marine mammal distribution, relative abundance, and behavior in ORPC’s proposed deployment area at East Foreland. ORPC also completed work near Fire Island where ORPC held a FERC preliminary permit (P-12679) until March 6, 2013. Passive hydroacoustic devices (previously utilized with bowhead whales in the Beaufort Sea) were adapted for study of beluga whales to determine the relative abundance of beluga whale vocalizations within the proposed deployment areas. Hydroacoustic data collected during the Project were used to characterize the ambient acoustic environment of the project site pre-deployment to inform the

  3. High Performance Methane Thrust Chamber (HPMTC) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — ORBITEC proposes to develop a High-Performance Methane Thrust Chamber (HPMRE) to meet the demands of advanced chemical propulsion systems for deep-space mission...

  4. Loaded Gelled Bipropellants for Optimized Performance Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The focus of this program is the development and validation of formulations, and development methodologies, for optimizing high-performance particulate-loaded...

  5. Radiation Hard High Performance Optoelectronic Devices Project

    Data.gov (United States)

    National Aeronautics and Space Administration — High-performance, radiation-hard, widely-tunable integrated laser/modulator chip and large-area avalanche photodetectors (APDs) are key components of optical...

  6. Integrated Performance Testing for Nonproliferation Support Project

    Energy Technology Data Exchange (ETDEWEB)

    Johns, Russell; Bultz, Garl Alan; Byers, Kenneth R.; Yaegle, William

    2013-08-20

    The objective of this workshop is to provide participants with training in testing techniques and methodologies for assessment of the performance of: Physical Protection system elements; Material Control and Accounting (MC&A) system elements.

  7. Power Monitoring and Control for Large Scale projects: SKA, a case study

    CERN Document Server

    Barbosa, Domingos; Maia, Dalmiro; Carvalho, Bruno; Vieira, Jorge; Swart, Paul; Roux, Gerhard Le; Natarajan, Swaminathan; van Ardenne, Arnold; Seca, Luis

    2016-01-01

    Large sensor-based science infrastructures for radio astronomy like the SKA will be among the most intensive data-driven projects in the world, facing very high demanding computation, storage, management, and above all power demands. The geographically wide distribution of the SKA and and its associated processing requirements in the form of tailored High Performance Computing (HPC) facilities, require a Greener approach towards the Information and Communications Technologies (ICT) adopted for the data processing to enable operational compliance to potentially strict power budgets. Addressing the reduction of electricity costs, improve system power monitoring and the generation and management of electricity at system level is paramount to avoid future inefficiencies and higher costs and enable fulfillments of Key Science Cases. Here we outline major characteristics and innovation approaches to address power efficiency and long-term power sustainability for radio astronomy projects, focusing on Green ICT for s...

  8. Monitoring Air Quality over China: Evaluation of the modeling system of the PANDA project

    Science.gov (United States)

    Bouarar, Idir; Katinka Petersen, Anna; Brasseur, Guy; Granier, Claire; Xie, Ying; Wang, Xuemei; Fan, Qi; Wang, Lili

    2015-04-01

    Air pollution has become a pressing problem in Asia and specifically in China due to rapid increase in anthropogenic emissions related to growth of China's economic activity and increasing demand for energy in the past decade. Observed levels of particulate matter and ozone regularly exceed World Health Organization (WHO) air quality guidelines in many parts of the country leading to increased risk of respiratory illnesses and other health problems. The EU-funded project PANDA aims to establish a team of European and Chinese scientists to monitor air pollution over China and elaborate air quality indicators in support of European and Chinese policies. PANDA combines state-of-the-art air pollution modeling with space and surface observations of chemical species to improve methods for monitoring air quality. The modeling system of the PANDA project follows a downscaling approach: global models such as MOZART and MACC system provide initial and boundary conditions to regional WRF-Chem and EMEP simulations over East Asia. WRF-Chem simulations at higher resolution (e.g. 20km) are then performed over a smaller domain covering East China and initial and boundary conditions from this run are used to perform simulations at a finer resolution (e.g. 5km) over specific megacities like Shanghai. Here we present results of model simulations for January and July 2010 performed during the first year of the project. We show an intercomparison of the global (MACC, EMEP) and regional (WRF-Chem) simulations and a comprehensive evaluation with satellite measurements (NO2, CO) and in-situ data (O3, CO, NOx, PM10 and PM2.5) at several surface stations. Using the WRF-Chem model, we demonstrate that model performance is influenced not only by the resolution (e.g. 60km, 20km) but also the emission inventories used (MACCity, HTAPv2), their resolution and diurnal variation, and the choice of initial and boundary conditions (e.g. MOZART, MACC analysis).

  9. Performance Monitoring of a Nearshore Berm at Ft. Myers Beach, Florida

    Science.gov (United States)

    2013-08-01

    respectively. ................................................. 121  ERDC/CHL TR-13-11 xiii Preface This study was performed by the Coastal ...monitoring study conducted by the Coastal Inlets Research Program (CIRP) and Regional Sediment Management (RSM) Program, two US Army Corps of...to predictive models of the Perdido Key Beach nourishment project, Florida USA. Coastal Engineering (39) 173-191. Brutsche, K. E. and P. Wang. 2012

  10. Effective Monitoring and Control of Outsourced Software Development Projects

    NARCIS (Netherlands)

    Ponisio, Laura; Vruggink, P.

    2011-01-01

    In our study of four outsourcing projects we discover mechanisms to support managerial decision making during software development processes. We report on Customer Office, a framework used in practice that facilitates reasoning about projects by highlighting information paths and making

  11. Fast flux test facility performance monitoring management information; June 1989

    Energy Technology Data Exchange (ETDEWEB)

    Newland, D J

    1989-07-01

    The purpose of this report is to provide management with performance data on key performance indicators selected from the FFTF Early Warning System performance indicators. This report contains the results for key performance indicators divided into two categories of ``overall`` and ``other``. The ``overall`` performance indicators, when considered in the aggregate, provide one means of monitoring overall plant performance. The data should be used in conjunction with the results of other management assessment activities to focus improvement efforts. Use of these key performance indicators as a group is stressed, since focusing on a single indicator or a narrow set of indicators can be counterproductive both to safety and to long-term performance improvement.

  12. Fast Flux Test Facility Performance Monitoring Management Information March 1989

    Energy Technology Data Exchange (ETDEWEB)

    Newland, D. J.

    1989-04-01

    The purpose of this report is to provide management with performance data on key performance indicators selected from the FFTF Early Warning System performance indicators. This report contains the results for key performance indicators divided into two categories of ``overall`` and ``other.`` The ``overall`` performance indicators, when considered in the aggregate, provide one means of monitoring overall plant performance. The data should be used in conjunction with the results of other management assessment activities to focus improvement efforts. Use of these key performance indicators as a group is stressed, since focusing on a single indicator or a narrow set of indicators can be counterproductive both to safety and to long-term performance improvement. This report must be reviewed with the understanding that both the design and the mission are different for FFTF compared to commercial power reactors.

  13. A Mega-project on Space Weather Monitoring Gets the Green Light

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    @@ A 200-million-yuan ($25 million) mega-project of science research on space weather monitoring, namely the Meridian Space Weather Moni toting Project (Meridian Project for short), proposed by several research institutes and universities in China has been approved recently by the Chinese government.

  14. Monitoring load, recovery and performance in young elite soccer players

    NARCIS (Netherlands)

    Brink, Michel S.; Nederhof, Esther; Visscher, Chris; Schmikli, Sandor L.; Lemmink, Koen A. P. M.

    2010-01-01

    Brink, MS, Nederhof, E, Visscher, C, Schmikli, SL, and Lemmink, KAPM. Monitoring load, recovery, and performance in young elite soccer players. J Strength Cond Res 24(3): 597603, 2010-The purpose of this study was to investigate the relation between training load, recovery, and monthly field test pe

  15. Mastitis diagnostics and performance monitoring: a practical approach

    NARCIS (Netherlands)

    Lam, T.J.G.M.; Olde Riekerink, R.; Sampimon, O.C.; Smith, H.E.

    2009-01-01

    In this paper a review is given of frequently used mastitis diagnostic methods in modern dairy practice. Methods used at the quarter, cow, herd and regional or national level are discussed, including their usability for performance monitoring in udder health. Future developments, such as systems in

  16. 45 CFR 2543.51 - Monitoring and reporting program performance.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Monitoring and reporting program performance. 2543.51 Section 2543.51 Public Welfare Regulations Relating to Public Welfare (Continued) CORPORATION FOR NATIONAL AND COMMUNITY SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND...

  17. The Effects of Self-Monitoring on Safe Posture Performance

    Science.gov (United States)

    Gravina, Nicole; Austin, John; Schoedtder, Lori; Loewy, Shannon

    2008-01-01

    The purpose of the present study was to examine the effects of self-monitoring on safe positioning of individuals performing a typing task and an assembly task using a multiple baseline design across behaviors and tasks. The study took place in an analogue office setting with seven college student participants. The dependent variable was the…

  18. 38 CFR 49.51 - Monitoring and reporting program performance.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Monitoring and reporting program performance. 49.51 Section 49.51 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... not be required more frequently than quarterly or, less frequently than annually. Annual reports...

  19. Monitoring User-System Performance in Interactive Retrieval Tasks

    NARCIS (Netherlands)

    Boldareva, L.; de Vries, A.P.; Hiemstra, Djoerd

    Monitoring user-system performance in interactive search is a challenging task. Traditional measures of retrieval evaluation, based on recall and precision, are not of any use in real time, for they require a priori knowledge of relevant documents. This paper shows how a Shannon entropy-based

  20. Monitoring user-system performance in interactive retrieval tasks

    NARCIS (Netherlands)

    L. Boldareva; A.P. de Vries (Arjen); D. Hiemstra

    2004-01-01

    textabstractMonitoring user-system performance in interactive search is a challenging task. Traditional measures of retrieval evaluation, based on recall and precision, are not of any use in real time, for they require a priori knowledge of relevant documents. This paper shows how a Shannon

  1. Monitoring user-system performance in interactive retrieval tasks

    NARCIS (Netherlands)

    Boldareva, L.; Vries, A.P. de; Hiemstra, D.

    2004-01-01

    Monitoring user-system performance in interactive search is a challenging task. Traditional measures of retrieval evaluation, based on recall and precision, are not of any use in real time, for they require a priori knowledge of relevant documents. This paper shows how a Shannon entropy-based measur

  2. Developments in Performance Monitoring of Concrete Exposed to Extreme Environments.

    OpenAIRE

    McCarter, W.J.; Chrisp, T. M.; Starrs, G.; Adamson, A.; Owens, E; Basheer, P. A. M.; Nanukuttan, S. V.; Srinivasan, S; Holmes, Niall

    2011-01-01

    The performance of the surface zone of concrete is acknowledged as a major factor governing the rate of deterioration of reinforced concrete structures because it provides the only barrier to the ingress of water containing dissolved ionic species such as chlorides, which ultimately initiate corrosion of the reinforcement. In situ monitoring of cover-zone concrete is therefore critical in attempting to make realistic predictions as to the in-service performance of the structure. To this end, ...

  3. Automated Performance Monitoring and Assessment for DCS Digital Systems.

    Science.gov (United States)

    1977-10-01

    eye opening monitor performance assessment techniques. (3) Implement and program a CPMAS test processor subsystem. (4) Perform a field test site...an internodal path in the planned DEB network is 11 ( Hillingdon to Schoenfeld). For this reason, the path from Node A to Node B in the Transmission...RADIOS SITE RADIOS HOHENSTADT 4 BANN 6 STUTTGART 4 HILLINGDON 3 LANGERKOPF 5 CROUGHTON 4 DONNERSBERG 10 MARTLESHAM HEATH 3 PIRMASENS 4 ADENAU 3

  4. Factors Affecting Sustainable Performance of Construction Projects during Project Life Cycle Phases

    OpenAIRE

    Adnan Enshassi; Bernd Kochendoerfer; Hadeel Al Ghoul

    2016-01-01

    Sustainable development (SD) is one of the main challenges faced by the construction industry, which has acquired global attention. Sustainable performance (SP) of a construction project during its life cycle (LC) is considered crucial to achieve the SD. The aim of this paper is to investigate the factors affecting sustainable performance of construction projects throughout project life cycle phases in the Gaza Strip. A total of 53 sustainable factors (economic, social, and environmental sust...

  5. Fast Beam Condition Monitor for CMS: performance and upgrade

    CERN Document Server

    Leonard, Jessica Lynn; Burtowy, Piotr; Dabrowski, Anne; Hempel, Maria; Henschel, Hans; Lange, Wolfgang; Lohmann, Wolfgang; Odell, Nathaniel; Penno, Marek; Pollack, Brian; Przyborowski, Dominik; Ryjov, Vladimir; Stickland, David; Walsh, Roberval; Warzycha, Weronika; Zagozdzinska, Agnieszka

    2014-01-01

    The CMS beam and radiation monitoring subsystem BCM1F (Fast Beam Condition Monitor) consists of 8 individual diamond sensors situated around the beam pipe within the pixel detector volume, for the purpose of fast bunch-by-bunch monitoring of beam background and collision products. In addition, effort is ongoing to use BCM1F as an online luminosity monitor. BCM1F will be running whenever there is beam in LHC, and its data acquisition is independent from the data acquisition of the CMS detector, hence it delivers luminosity even when CMS is not taking data. A report is given on the performance of BCM1F during LHC run I, including results of the van der Meer scan and on-line luminosity monitoring done in 2012. In order to match the requirements due to higher luminosity and 25 ns bunch spacing, several changes to the system must be implemented during the upcoming shutdown, including upgraded electronics and precise gain monitoring. First results from Run II preparation are shown.

  6. New analysis and performance of a wall-current monitor

    Energy Technology Data Exchange (ETDEWEB)

    Suwada, T.; Urano, T.; Kobayashi, H. [National Lab. for High Energy Physics, Tsukuba, Ibaraki (Japan); Tamiya, K.; Asami, A. [Naruto University of Education, Takashima, Naruto-cho, Naruto-shi 772 (Japan)

    1997-09-01

    A new wall-current monitor has been developed in order to reinforce the beam-monitoring system in the PF 2.5-GeV linac for the KEK B-Factory. A prototype monitor was tested for its performance and characteristics. The experimental results in terms of both bench tests and beam tests by single-bunch electron beams were analyzed on the basis of equivalent-circuit models. The frequency response of the monitor agreed well with a lumped equivalent-circuit model for both time- and frequency-domain measurements. The position dependence and its frequency characteristics of the monitor also agreed well with a distributed equivalent-circuit model for both time- and frequency-domain measurements. The rise time of the monitor was about 3 ns, which indicated a poor response for short-pulse beams (<1) ns. The reason could be attributed to the stray inductance of the ceramic solid resistor and not very good frequency response of the ferrite core. (orig.).

  7. Pioneer CESA Guidance Project; Counselor Performance Assessment.

    Science.gov (United States)

    Bryant, Brenda; Andrews, Theodore

    This document contains the performance assessment instruments and criteria which will be applied as part of the certification process for beginning school counselors in Georgia. The purpose of the process is to provide the candidate with an opportunity to demonstrate the essential competencies on the job. While the candidate bears the ultimate…

  8. NDE and Stress Monitoring on Composite Overwrapped Pressure Vessels Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Damage caused by composite overwrapped pressure vessels (COPVs) failure can be catastrophic. Thus, monitoring condition and stress in the composite overwrap,...

  9. Compact Monitor for Airborne Carbon Dioxide Measurements Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Eltron Research & Development proposes the development of a lightweight, battery-powered instrument for accurately and rapidly monitoring the local concentration...

  10. Supervision and Performance : The Case of World Bank Projects

    NARCIS (Netherlands)

    Kilby, C.

    1995-01-01

    This paper explores empirical aspects of the relation between supervision and project performance. I focus on development projects funded by the World Bank and on supervision done by the World Bank. The World Bank is the preeminent international development organization both in terms of money lent a

  11. Sprint Running Performance Monitoring: Methodological and Practical Considerations.

    Science.gov (United States)

    Haugen, Thomas; Buchheit, Martin

    2016-05-01

    The aim of this review is to investigate methodological concerns associated with sprint performance monitoring, more specifically the influence and magnitude of varying external conditions, technology and monitoring methodologies not directly related to human physiology. The combination of different starting procedures and triggering devices can cause up to very large time differences, which may be many times greater than performance changes caused by years of conditioning. Wind, altitude, temperature, barometric pressure and humidity can all combine to yield moderate time differences over short sprints. Sprint performance can also be affected by the athlete's clothing, principally by its weight rather than its aerodynamic properties. On level surfaces, the track compliance must change dramatically before performance changes larger than typical variation can be detected. An optimal shoe bending stiffness can enhance performance by a small margin. Fully automatic timing systems, dual-beamed photocells, laser guns and high-speed video are the most accurate tools for sprint performance monitoring. Manual timing and single-beamed photocells should be avoided over short sprint distances (10-20 m) because of large absolute errors. The validity of today's global positioning systems (GPS) technology is satisfactory for long distances (>30 m) and maximal velocity in team sports, but multiple observations are still needed as reliability is questionable. Based on different approaches used to estimate the smallest worthwhile performance change and the typical error of sprint measures, we have provided an assessment of the usefulness of speed evaluation from 5 to 40 m. Finally, we provide statistical guidelines to accurately assess changes in individual performance; i.e. considering both the smallest worthwhile change in performance and the typical error of measurement, which can be reduced while repeating the number of trials.

  12. Identification of coordination factors affecting building projects performance

    Directory of Open Access Journals (Sweden)

    Wesam Salah Alaloul

    2016-09-01

    Full Text Available Construction projects performance requires improvement to fulfil the complexity of the stakeholders’ needs and expectations. Coordination process is proposed as an efficient solution for weak performance of construction projects. Therefore, coordination factors are vital in ensuring a successful implementation of all project phases. This study aimed to identify and prioritise coordination factors that influence the performance of building projects in Malaysian context. A vast body of literature on coordination process was reviewed and resulted in 53 coordination factor. Three rounds of Delphi technique were conducted. The most effective coordination factors were ranked based on the Relative Importance Index (RII such as Scheduling (RII = 0.97, Quality assurance plan (RII = 0.93, and all parties’ participation in plans (RII = 0.89. These coordination factors have fulfilled the research gap and provided better management and higher performance for project parties. The results offer insightful perspectives to define the most effective coordination factors, for addressing the dependency between project tasks and the parties to enhance project performance.

  13. High Performance Low Mass Nanowire Enabled Heatpipe Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Illuminex Corporation proposes a NASA Phase I SBIR project to develop high performance, lightweight, low-profile heat pipes with enhanced thermal transfer properties...

  14. Explanation of the project - The Rice Growth Monitoring for The Phenotypic Functional Analysis | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available The Rice Growth Monitoring for The Phenotypic Functional Analysis Explanation of the project Data detail Dat...tion of the project - The Rice Growth Monitoring for The Phenotypic Functional Analysis | LSDB Archive ...

  15. Sampling and Filtering in Photovoltaic System Performance Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Driesse, Anton [PV Performance Labs, Freiburg (Germany); Stein, Joshua S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Photovoltaic and Distributed Systems Integration; Riley, Daniel M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Photovoltaic and Distributed Systems Integration; Carmignani, Craig K. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Photovoltaic and Distributed Systems Integration

    2014-10-01

    The performance of photovoltaic systems must be monitored accurately to ensure profitable long-term operation. The most important signals to be measured—irradiance and temperature, as well as power, current and voltage on both DC and AC sides of the system—contain rapid fluctuations that are not observable by typical monitoring systems. Nevertheless these fluctuations can affect the accuracy of the data that are stored. This report closely examines the main signals in one operating PV system, which were recorded at 2000 samples per second. It analyzes the characteristics and causes of the rapid fluctuations that are found, such as line-frequency harmonics, perturbations from anti-islanding detection, MPPT searching action and others. The operation of PV monitoring systems is then simulated using a wide range of sampling intervals, archive intervals and filtering options to assess how these factors influence data accuracy. Finally several potential sources of error are discussed with real-world examples.

  16. Composite Overwrapped Pressure Vessels (COPV) Monitoring System Using Fiber Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Intelligent Fiber Optic Systems Corporation (IFOS) proposes, in this Phase 1 SBIR project, to demonstrate the feasibility of innovations based on an...

  17. QLab 3 show control projects for live performances & installations

    CERN Document Server

    Hopgood, Jeromy

    2013-01-01

    Used from Broadway to Britain's West End, QLab software is the tool of choice for many of the world's most prominent sound, projection, and integrated media designers. QLab 3 Show Control: Projects for Live Performances & Installations is a project-based book on QLab software covering sound, video, and show control. With information on both sound and video system basics and the more advanced functions of QLab such as MIDI show control, new OSC capabilities, networking, video effects, and microphone integration, each chapter's specific projects will allow you to learn the software's capabilitie

  18. MATERIALS PERFORMANCE TARGETED THRUST FY 2004 PROJECTS

    Energy Technology Data Exchange (ETDEWEB)

    DOE

    2005-09-13

    The Yucca Mountain site was recommended by the President to be a geological repository for commercial spent nuclear fuel and high-level radioactive waste. The multi-barrier approach was adopted for assessing and predicting system behavior, including both natural barriers and engineered barriers. A major component of the long-term strategy for safe disposal of nuclear waste is first to completely isolate the radionuclides in waste packages for long times and then to greatly retard the egress and transport of radionuclides from penetrated packages. The goal of the Materials Performance Targeted Thrust program is to further enhance the understanding of the role of engineered barriers in waste isolation. In addition, the Thrust will explore technical enhancements and seek to offer improvements in materials costs and reliability.

  19. Integrating policy-based management and SLA performance monitoring

    Science.gov (United States)

    Liu, Tzong-Jye; Lin, Chin-Yi; Chang, Shu-Hsin; Yen, Meng-Tzu

    2001-10-01

    Policy-based management system provides the configuration capability for the system administrators to focus on the requirements of customers. The service level agreement performance monitoring mechanism helps system administrators to verify the correctness of policies. However, it is difficult for a device to process the policies directly because the policies are the management concept. This paper proposes a mechanism to decompose a policy into rules that can be efficiently processed by a device. Thus, the device may process the rule and collect the performance statistics information efficiently; and the policy-based management system may collect these performance statistics information and report the service-level agreement performance monitoring information to the system administrator. The proposed policy-based management system achieves both the policy configuration and service-level agreement performance monitoring requirements. A policy consists of a condition part and an action part. The condition part is a Boolean expression of a source host IP group, a destination host IP group, etc. The action part is the parameters of services. We say that an address group is compact if it only consists of a range of IP address that can be denoted by a pair of IP address and corresponding IP mask. If the condition part of a policy only consists of the compact address group, we say that the policy is a rule. Since a device can efficiently process a compact address and a system administrator prefers to define a range of IP address, the policy-based management system has to translate policy into rules and supplements the gaps between policy and rules. The proposed policy-based management system builds the relationships between VPN and policies, policy and rules. Since the system administrator wants to monitor the system performance information of VPNs and policies, the proposed policy-based management system downloads the relationships among VPNs, policies and rules to the

  20. Factors Affecting Sustainable Performance of Construction Projects during Project Life Cycle Phases

    Directory of Open Access Journals (Sweden)

    Adnan Enshassi

    2016-03-01

    Full Text Available Sustainable development (SD is one of the main challenges faced by the construction industry, which has acquired global attention. Sustainable performance (SP of a construction project during its life cycle (LC is considered crucial to achieve the SD. The aim of this paper is to investigate the factors affecting sustainable performance of construction projects throughout project life cycle phases in the Gaza Strip. A total of 53 sustainable factors (economic, social, and environmental sustainable factors were identified through extensive literature review and confirmed by experts’ interviews and a pilot study. These factors are classified in relation to the project life cycle phases; inception phase, design phase, construction phase, operation phase, and demolition phase. A structured questionnaire survey is employed in this study for primary data collection. A total of 119 questionnaires were distributed randomly to engineers working in construction projects in the Gaza Strip to solicit their views regarding the factors affecting sustainable performance of construction projects throughout project life cycle phases. The results revealed that five factors among the top ten factors that impacting the sustainable performance of construction projects are classified under the construction phase, which confirmed that the construction process has the most effect on the projects SP. Three factors are classified under the inception phase, which assured that the inception of a potential project has a considerable effect projects. In addition, one factor was classified under operation phase and one factor was classified under demolition phase. The most common factors affecting the SP of construction project through the overall sustainability elements: reusable/recyclable element, provision of services, energy consumption, water cost, and water pollution assessment. Further studies are recommended to explore how to integrated sustainability concepts into

  1. Performance Evaluation of a Drilling Project in Oil and Gas Service Company in Indonesia by MACBETH Method

    Science.gov (United States)

    Dachyar, M.; Rhezza Pratama, Novandra

    2014-04-01

    Decision-making in a project is a complex undertaking. A project is a temporary organization that is surrounded by inherent uncertainties. Uncertainties that may occur in the project, among others, are the uncertainty of the time, cost, and quality. To overcome this complexity, we need a project performance evaluation. At one of the services the oil and gas in Indonesia, the performance evaluation has been done, but it is done separately and only few criteria are evaluated, so that the overall project performance is still not visible. Therefore it is necessary to evaluate the performance of the company's project with the MCDA (Multi Criteria Decision Analysis) approach using MACBETH (Measuring Attractiveness by a Categorical Based Evaluation Technique) method that can model the elements of the project into a supervisory level group to facilitate decision making by the project manager. These measurements will produce levels of monitoring classification of project element groups, i.e. absolute vigilance, strong attention, close surveillance, and normal monitoring of the project elements. This research finds that the criteria of Effectiveness, Efficiency, Time, Cost, and Complete Reports & Field Tickets require absolute vigilance so that the performance criteria can be increased.

  2. Aircraft Control Augmentation and Health Monitoring Using FADS Technology Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase I research proposal is aimed at demonstrating the feasibility of an innovative architecture comprising control augmentation and on-line health monitoring...

  3. Distributed Rocket Engine Testing Health Monitoring System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Leveraging the Phase I achievements of the Distributed Rocket Engine Testing Health Monitoring System (DiRETHMS) including its software toolsets and system building...

  4. Community air monitoring and the Village Green Project

    Science.gov (United States)

    Cost and logistics are practical issues that have historically constrained the number of locations where long-term, active air pollution measurement is possible. In addition, traditional air monitoring approaches are generally conducted by technical experts with limited engageme...

  5. Improved Combustion Products Monitor for the ISS Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Compound Specific Analyzer – Combustion Products, used on the International Space Station as a warning monitor of smoldering or combustion events, is being...

  6. Non-linear Ultrasonic Bond-Strength Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — To date, bond strength is considered one of the ?holy grails? for NDE. Preliminary data indicates that the Luna Nonlinear Ultrasonic Bond Strength (NUBS) monitor...

  7. Novel Real-Time Flight Envelope Monitoring System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an aircraft flight envelope monitoring system that will provide real-time in-cockpit estimations of aircraft flight envelope boundaries,...

  8. Community air monitoring and the Village Green Project

    Science.gov (United States)

    Abstract: Cost and logistics are practical issues that have historically constrained the number of locations where long-term, active air pollution measurement is possible. In addition, traditional air monitoring approaches are generally conducted by technical experts with limite...

  9. Novel Real-Time Flight Envelope Monitoring System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an aircraft flight envelope monitoring system that will provide real-time in-cockpit estimations of aircraft flight envelope boundaries....

  10. Improved Combustion Products Monitor for the ISS Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Compound Specific Analyzer - Combustion Products is used on the International Space Station as a warning monitor of smoldering or combustion events and, after...

  11. Multi-Modal Neurodiagnostic Tool for Stress Monitoring Project

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA has a requirement for a neurodiagnostic tool that can be used to monitor the behavioral health of the crew during long duration Exploration missions. The device...

  12. Water chemistry - Thornton Creek Restoration Project Effectiveness Monitoring

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NOAA has designed and is currently implementing a hyporheic monitoring plan for the Thornton Creek watershed in North Seattle. This work is being conducted for...

  13. Micro GC's for Contaminant Monitoring in Spacecraft Air Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this proposal is to create new gas chromatographs (GCs) for contaminant monitoring in spacecraft air that do not require any reagents or special...

  14. Wearable Beat to Beat Blood Pressure Monitor Project

    Data.gov (United States)

    National Aeronautics and Space Administration — A key component of NASA's human exploration programs is a system that monitors the health of the crew during space missions. The wearable beat-to-beat blood pressure...

  15. Aquatic Invertebrates - Thornton Creek Restoration Project Effectiveness Monitoring

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NOAA has designed and is currently implementing a hyporheic monitoring plan for the Thornton Creek watershed in North Seattle. This work is being conducted for...

  16. Novel Non-Intrusive Vibration Monitoring System for Turbopumps Project

    Data.gov (United States)

    National Aeronautics and Space Administration — ASRI proposes to develop an advanced and commercially viable Non-Intrusive Vibration Monitoring System (NI-VMS) which can provide effective on-line/off-line engine...

  17. In-Situ Monitoring of Immune Function Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Monitoring the health and wellness of mission pilots is a critically important function. Space flight has an adverse effect on the human immune response. During...

  18. Passive Wireless Sensor System for Structural Health Monitoring Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Albido proposes to develop a Passive Wireless Sensor System for Structural Health Monitoring capable of measuring high-bandwidth temperature and strain of space and...

  19. Internet end-to-end performance monitoring for the High Energy Nuclear and Particle Physics community

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, W.

    2000-02-22

    Modern High Energy Nuclear and Particle Physics (HENP) experiments at Laboratories around the world present a significant challenge to wide area networks. Petabytes (1015) or exabytes (1018) of data will be generated during the lifetime of the experiment. Much of this data will be distributed via the Internet to the experiment's collaborators at Universities and Institutes throughout the world for analysis. In order to assess the feasibility of the computing goals of these and future experiments, the HENP networking community is actively monitoring performance across a large part of the Internet used by its collaborators. Since 1995, the pingER project has been collecting data on ping packet loss and round trip times. In January 2000, there are 28 monitoring sites in 15 countries gathering data on over 2,000 end-to-end pairs. HENP labs such as SLAC, Fermi Lab and CERN are using Advanced Network's Surveyor project and monitoring performance from one-way delay of UDP packets. More recently several HENP sites have become involved with NLANR's active measurement program (AMP). In addition SLAC and CERN are part of the RIPE test-traffic project and SLAC is home for a NIMI machine. The large End-to-end performance monitoring infrastructure allows the HENP networking community to chart long term trends and closely examine short term glitches across a wide range of networks and connections. The different methodologies provide opportunities to compare results based on different protocols and statistical samples. Understanding agreement and discrepancies between results provides particular insight into the nature of the network. This paper will highlight the practical side of monitoring by reviewing the special needs of High Energy Nuclear and Particle Physics experiments and provide an overview of the experience of measuring performance across a large number of interconnected networks throughout the world with various methodologies. In particular, results

  20. Complete Web Monitoring Watching Performance, Users, and Communities

    CERN Document Server

    Croll, Alistair

    2009-01-01

    Complete Web Monitoring demonstrates how to measure every aspect of your web presence -- including analytics, backend performance, usability, communities, customer feedback, and competitive analysis -- whether you're running an e-commerce site, a community, a media property, or a Software-as-a-Service company. This book's concrete examples, clear explanations, and practical recommendations make it essential for anyone who runs a website.

  1. Evaluation of Activity Recognition Algorithms for Employee Performance Monitoring

    OpenAIRE

    2012-01-01

    Successful Human Resource Management plays a key role in success of any organization. Traditionally, human resource managers rely on various information technology solutions such as Payroll and Work Time Systems incorporating RFID and biometric technologies. This research evaluates activity recognition algorithms for employee performance monitoring. An activity recognition algorithm has been implemented that categorized the activity of employee into following in to classes: job activities and...

  2. IMPROVING CLIENT INTERNAL CAPABILITY TO MONITOR PUBLIC-PRIVATE PARTNERSHIPS PROJECTS: A REVIEW

    Directory of Open Access Journals (Sweden)

    Abdullahi Ahmed Umar

    2012-01-01

    Full Text Available Public-Private Partnerships (PPP or Private Finance Initiatives (PFI are increasingly becoming very popular with governments across the globe for the provision of public infrastructure and services. When contracted, the public sector client believing the private sector will act in accordance with ‘bounded rationality’, ignores the constant monitoring and review process which is an integral part of any project. However, the failures of some of these partnerships and the social and economic costs incurred due to laxity in monitoring reminds us of the need to develop the permanent bureaucratic machinery of government, who share the government’s unique objectives of end-users satisfaction rather than shareholders’, to perform the monitoring of these projects. Though the public sector has been delivering projcets for dacades, the complexities associated with the PFI strategy has opened up new challenges for its staff. Most failures and moral harzards are only discovered after scandals evoke investigations like the case of Enron or when public criticisms force the government to reverse their decision as in the case of the Skye toll bridge by which time a lot of damage would have be done. Literature has shown that when employees are trained and engaged in organisational decisions and policy planning they make policy executions easier. Therefore, considering the Theoretical ideology behind the PFI of the asset being returned to the Public sector at the end of the concession, it becomes pertinent for proper training of the public sector staff. Public sector officials, if adequately trained and motivated can perform the tasks being contracted out to private consultants thereby re-affirming government’s commitment to its Value for Money (VFM proposition. Though the public sector staff strength has been depleted due to the adoption of New Public Management (NPM, however the remaining qualified staff can be pooled to create an

  3. On-Orbit Health Monitoring and Repair Assessment of Thermal Protection Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR project delivers On-orbit health MoNItoring and repair assessment of THERMal protection systems (OMNI_THERM). OMNI_THERM features impedance-based...

  4. Autonomus I&C Maintenance and Health Monitoring System for Fission Surface Power Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The primary goal of this project is to design and develop an autonomous instrumentation and control (I&C) health monitoring system for space nuclear power...

  5. Data Analysis Algorithm Suitable for Structural Health Monitoring Based on Dust Network Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposed project will attempt to develop a data analysis system for structural health monitoring on space structures. The data analysis software will be a key...

  6. Wireless Health Monitoring for Large Arrays of MEMS Sensors and Actuators Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this Phase I project is to demonstrate an automated on-line structural health monitoring system for aircraft structures using a combination of...

  7. Fast Flux Test Facility performance monitoring management information, October 1988

    Energy Technology Data Exchange (ETDEWEB)

    Newland, D J

    1988-11-01

    The purpose of this report is to provide management with performance data on key performance indicators selected from the FFTF Early Warning System performance indicators. This report contains the results for key performance indicators divided into two categories of ``overall`` and ``other``. The ``overall`` performance indicators, when considered in the aggregate, provide one means of monitoring overall plant performance. Overall performance indicators are listed in Table 1. The ``other`` performance indicators, listed in Table 2, are considered useful management tools for assessing the specific areas they address. The data should be used in conjunction with the the results of other management assessment activities to focus improvement efforts. Use of these key performance indicators as a group is stressed, since focusing on a single indicator or a narrow set of indicators can be counterproductive both to safety and to long-term performance improvement. Any concerns regarding the accuracy or analysis of the specific indicator should be addressed to the responsible manager identified on the figure. This report must be reviewed with the understanding that both the design and the mission are different for FFTF compared to commercial power reactors. 26 figs.

  8. Novel anomaly detection approach for telecommunication network proactive performance monitoring

    Institute of Scientific and Technical Information of China (English)

    Yanhua YU; Jun WANG; Xiaosu ZHAN; Junde SONG

    2009-01-01

    The mode of telecommunication network management is changing from "network oriented" to "subscriber oriented". Aimed at enhancing subscribers'feeling, proactive performance monitoring (PPM) can enable a fast fault correction by detecting anomalies designating performance degradation. In this paper, a novel anomaly detection approach is the proposed taking advantage of time series prediction and the associated confidence interval based on multiplicative autoregressive integrated moving average (ARIMA). Furthermore, under the assumption that the training residual is a white noise process following a normal distribution, the associated confidence interval of prediction can be figured out under any given confidence degree 1-α by constructing random variables satisfying t distribution. Experimental results verify the method's effectiveness.

  9. Prime Hook NWR Marsh Restoration Project Summary & Monitoring Plan 2015

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This living document provides a condensed explanation of wetland management history and a large-scale tidal marsh restoration project at Prime Hook NWR in Delaware....

  10. LCREP growth rates - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  11. LCREP chemistry and lipids - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  12. LCREP catch records - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  13. LCREP genetic stock ID - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  14. LCREP prey data - Lower Columbia River Ecosystem Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 1) The purpose of this project is to document juvenile salmon habitat occurrence in the Lower Columbia River and estuary, and examine how habitat conditions...

  15. In-Process Monitoring of Additive Manufacturing Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The key innovation in this project is the implementation of an Imaging Fourier Transform Spectrometer (IFTS) for in situ metal additive manufacturing process...

  16. Media Performance in South Africa: A Shift from Vertical to Horizontal Monitoring.

    Science.gov (United States)

    van Zyl, John; Kantor, Lara

    1995-01-01

    Discusses the Media Monitoring Project (MMP) of South Africa, an organization that monitored the media ahead of and during South Africa's first democratic elections. Describes the MMP's roots and its activities and impact before, during, and after the election. (SR)

  17. Performance-based procurement for low disturbance brdige construction projects

    NARCIS (Netherlands)

    Sebastian, R.; Claeson-Jonsson, C.; Di Giulio, R.

    2013-01-01

    Purpose – This paper aims to introduce a method of performance-based procurement, based on the most economically advantageous tender (MEAT), for low-disturbance bridge construction projects in urban environment. Design/methodology/approach – The first part of this paper reviews the key performance i

  18. Performance-based procurement for low disturbance brdige construction projects

    NARCIS (Netherlands)

    Sebastian, R.; Claeson-Jonsson, C.; Di Giulio, R.

    2013-01-01

    Purpose – This paper aims to introduce a method of performance-based procurement, based on the most economically advantageous tender (MEAT), for low-disturbance bridge construction projects in urban environment. Design/methodology/approach – The first part of this paper reviews the key performance

  19. Process performance indicators in project pre-design stage

    NARCIS (Netherlands)

    Haponava, T.; Al-Jibouri, S.; Reymen, I.

    2006-01-01

    Traditionally performance in construction is measured based on the "iron-triangle”- time, cost and quality. In recent years indicators have been developed to include the measurements of other aspects of project performance. The main shortcoming of these however is that most of them are lagging indic

  20. Do Brazilian Credit Unions Adopt International Performance Monitoring?

    Directory of Open Access Journals (Sweden)

    Paulo Henrique Magalhães Oliveira

    2015-08-01

    Full Text Available Purpose: The study examined if the Brazilian credit unions use the 'PEARLS' performance monitoring methodology proposed by the World Council of Credit Unions, and the perception of the analysts of the cooperative system on the relevance of the indicators of this system.Methods: We used qualitative research with a sample selected through accessibility. Data were obtained from structured interviews conducted with five analysts of Brazil's Central Bank and two managers of central credit cooperatives, in addition to response, via questionnaire, of seventeen managers of credit unions located in the northern, northeast, south and southeast regions of Brazil.Results: Most of the individual cooperatives and the two central credit unions analyzed were unaware of the PEARLS methodology. This monitoring system is known only by the analysts of the Central Bank of Brazil, indicating that only the supervisory agent of cooperatives in Brazil knows the internationally proposed system and the adapted version proposed to Brazilian reality.Limitations: The survey via questionnaires obtained only 1,4% of population response rate, and the results can not be generalized.Practical implications: It can be said that there is room for improving performance monitoring techniques, as the PEARLS is used in 97 countries and unknown both by individual cooperatives and credit central cooperatives surveyed in this study.Originality: It is noteworthy that studies of this problem applied to the Brazilian reality were not found to date.

  1. Performance Assessment Framework for Private Finance Initiative Projects in Malaysia

    Directory of Open Access Journals (Sweden)

    Lop Nor Suzila

    2016-01-01

    Full Text Available Private Finance Initiative (PFI is viewed as restructuring the previous privatisation concept in delivering value for money for the Malaysian public infrastructure. Among the restructuring efforts in the privatisation is specifying the standard assessment of private concessionaires’ performance through the execution of key performance indicators (KPIs where the private concessionaires’ performance is benchmarked against the government’s standard. KPIs have served as useful tools in assessing performance of PFI projects. However, there is still lacking on determination methods performed to define and measure this KPIs and the absence of guidelines or a framework is also an issue in the implementation of the PFI procurement in Malaysia. Therefore, the objectives of this paper is to investigate the notion of performance assessment model approaches globally (i.e. UK, China, Australia, Serbia and Malaysia and to identify direction for PFI performance assessment tools (KPIs to be practiced in Malaysia. Based on the consideration of these models, this research paper propose an initial framework of performance assessment for PFI projects in Malaysia. The framework is deliberate to cover the performance of PFI at the operation and maintenance phase. The outcomes of this paper can serve as a theoretical base for the development of comprehensive and effective performance assessment for PFI projects in Malaysia.

  2. EXTREME PROGRAMMING PROJECT PERFORMANCE MANAGEMENT BY STATISTICAL EARNED VALUE ANALYSIS

    OpenAIRE

    Wei Lu; Li Lu

    2013-01-01

    As an important project type of Agile Software Development, the performance evaluation and prediction for eXtreme Programming project has significant meanings. Targeting on the short release life cycle and concurrent multitask features, a statistical earned value analysis model is proposed. Based on the traditional concept of earned value analysis, the statistical earned value analysis model introduced Elastic Net regression function and Laplacian hierarchical model to construct a Bayesian El...

  3. REDD+ readiness: early insights on monitoring, reporting and verification systems of project developers

    NARCIS (Netherlands)

    Joseph, S.; Herold, M.; Sunderlin, W.D.; Verchot, L.V.

    2013-01-01

    A functional measuring, monitoring, reporting and verification (MRV) system is essential to assess the additionality and impact on forest carbon in REDD+ (reducing emissions from deforestation and degradation) projects. This study assesses the MRV capacity and readiness of project developers at 20 R

  4. IT Best Practices Management, Teams, Quality, Performance, and Projects

    CERN Document Server

    Witt, Tom C

    2011-01-01

    Consistent success does not happen by chance. It occurs by having an understanding of what is happening in the environment and then having the skills to execute the necessary changes. Ideal for project, IT, and systems development managers, IT Best Practices: Management, Teams, Quality, Performance, and Projects details the skills, knowledge, and attributes needed to succeed in bringing about large-scale change. It explains how to incorporate quality methods into the change management process and outlines a holistic approach for transformation management. Detailing time-tested project manageme

  5. Remote instrumentation and safeguards monitoring for the star project

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, H M; Labiak, W; Spiridon, A

    2000-06-15

    A part of the Nuclear Energy Research Initiative (NERI) is the development of the Small Transportable Autonomous Reactor (STAR) for deployment in countries that do not have a nuclear industry. STARs would have an output of from 100 to 150 MW electric, would be fueled in the country of manufacture, and after 15 to 20 years of operation the reactor core would be returned to the country of manufacture for refueling. A candidate STAR design can be found in (Greenspan, 2000). This paper describes the design of the control and monitoring system that might be used. There are two unique features to this system. One is that the monitored information will be transmitted to a remote site for two purposes, safeguards, and allowing experts a great distance away direct access to view the reactor's operating parameters. The second feature is safeguards sensors will be designed into the system and there will monitoring of the safeguards aspects of the system for tampering. Any safeguards anomalies will be sent to the remote site as alarms. Encrypted satellite communications will be used to transmit the data. These features allow the STAR to be operated by a small staff and will reduce the costs of safeguards monitoring by reducing the number of plant visits by inspectors.

  6. Monitoring and Evaluation of Soil Conversation and Watershed Development Projects

    NARCIS (Netherlands)

    Graaff, de J.; Cameron, J.; Sombatpani, S.; Pieri, C.; Woodhill, A.J.

    2007-01-01

    Part One of this book introduces the challenges of monitoring and evaluating interventions designed by technical experts meeting the needs of people who actually use the environment which the interventions are seeking to modify. The chapters in this section seek reconciliation of these tensions thro

  7. Remote instrumentation and safeguards monitoring for the star project

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, H M; Labiak, W; Spiridon, A

    2000-06-15

    A part of the Nuclear Energy Research Initiative (NERI) is the development of the Small Transportable Autonomous Reactor (STAR) for deployment in countries that do not have a nuclear industry. STARs would have an output of from 100 to 150 MW electric, would be fueled in the country of manufacture, and after 15 to 20 years of operation the reactor core would be returned to the country of manufacture for refueling. A candidate STAR design can be found in (Greenspan, 2000). This paper describes the design of the control and monitoring system that might be used. There are two unique features to this system. One is that the monitored information will be transmitted to a remote site for two purposes, safeguards, and allowing experts a great distance away direct access to view the reactor's operating parameters. The second feature is safeguards sensors will be designed into the system and there will monitoring of the safeguards aspects of the system for tampering. Any safeguards anomalies will be sent to the remote site as alarms. Encrypted satellite communications will be used to transmit the data. These features allow the STAR to be operated by a small staff and will reduce the costs of safeguards monitoring by reducing the number of plant visits by inspectors.

  8. New idea of geomagnetic monitoring through ENA detection from the International Space Station: ENAMISS project

    Science.gov (United States)

    Milillo, Anna; De Angelis, Elisabetta; Orsini, Stefano; Rubini, Alda; Evangelista, Yuri; Mura, Alessandro; Rispoli, Rosanna; Vertolli, Nello; Carrubba, Elisa; Donati, Alessandro; Di Lellis, Andrea Maria; Plainaki, Christina; Lazzarotto, Francesco

    2016-04-01

    Remote sensing of Energetic Neutral Atoms (ENA) in the Earth's environment has been proven to be a successful technique able to provide detailed information on the ring current plasma population at energies below 100 keV. Indeed, the existing space weather databases usually include a good coverage of Sun and solar wind monitoring. The global imaging of the Earth's magnetosphere/ ionosphere is usually obtained by the high-latitudes monitoring of aurorae, ground magnetic field variations and high-latitude radio emissions. The equatorial magnetic field variations on ground, from which the geomagnetic indices like Dst, Sym-H and Asym-H are derived, include the effects of all current systems (i.e. ring current, Chapman -Ferraro current, tails currents, etc...) providing a kind of global information. Nevertheless, the specific information related to the ring current cannot be easily derived from such indices. Only occasional local plasma data are available by orbiting spacecraft. ENA detection is the only way to globally view the ring current populations. Up-to-now this technique has been used mainly from dedicated high altitude polar orbiting spacecraft, which do not allow a continuous and systematic monitoring, and a discrimination of the particle latitude distribution. The Energetic Neutral Atoms Monitor on the International space Station (ENAMISS) project intends to develop an ENA imager and install it on the ISS for continuous monitoring of the spatially distributed ring current plasma population. ISS is the ideal platform to perform continuous ENA monitoring since its particular low altitude and medium/low latitude orbit allows wide-field ENA images of various magnetospheric regions. The calibrated ENA data, the deconvolved ion distributions and ad-hoc ENA-based new geomagnetic indices will be freely distributed to the space weather community. Furthermore, new services based on plasma circulation models, spacecraft surface charging models and radiation dose models

  9. Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Evan; Mathew, Paul

    2009-04-01

    Buildings rarely perform as intended, resulting in energy use that is higher than anticipated. Building commissioning has emerged as a strategy for remedying this problem in non-residential buildings. Complementing traditional hardware-based energy savings strategies, commissioning is a 'soft' process of verifying performance and design intent and correcting deficiencies. Through an evaluation of a series of field projects, this report explores the efficacy of an emerging refinement of this practice, known as monitoring-based commissioning (MBCx). MBCx can also be thought of as monitoring-enhanced building operation that incorporates three components: (1) Permanent energy information systems (EIS) and diagnostic tools at the whole-building and sub-system level; (2) Retro-commissioning based on the information from these tools and savings accounting emphasizing measurement as opposed to estimation or assumptions; and (3) On-going commissioning to ensure efficient building operations and measurement-based savings accounting. MBCx is thus a measurement-based paradigm which affords improved risk-management by identifying problems and opportunities that are missed with periodic commissioning. The analysis presented in this report is based on in-depth benchmarking of a portfolio of MBCx energy savings for 24 buildings located throughout the University of California and California State University systems. In the course of the analysis, we developed a quality-control/quality-assurance process for gathering and evaluating raw data from project sites and then selected a number of metrics to use for project benchmarking and evaluation, including appropriate normalizations for weather and climate, accounting for variations in central plant performance, and consideration of differences in building types. We performed a cost-benefit analysis of the resulting dataset, and provided comparisons to projects from a larger commissioning 'Meta-analysis' database. A

  10. The ISTIMES project: a new integrated system for monitoring critical transport infrastructures interested by natural hazards

    Science.gov (United States)

    Proto, Monica; Massimo, Bavusi; Francesco, Soldovieri

    2010-05-01

    measurements. The integration of electromagnetic technologies with new ICT information and telecommunications systems enables remotely controlled monitoring and surveillance and real time data imaging of the critical transport infrastructures. Thus, the proposal will concern also with the development of tools for handling, analysing and processing large data volume (Information Fusion) and then providing information and performing behaviour prediction in a quick, easy and intuitive way (Situation Awareness). The proposal is based on several independent non-invasive imaging technologies based on electromagnetic sensing. Sensor cross validation, synergy and new data fusion and correlation schemes will permit a multi-method, multi-resolution and multi-scale electromagnetic detection and monitoring of surface and subsurface changes of the infrastructure. According to GMES and European Spatial Data Infrastructure (ESDI) initiatives, the system will adopt open architectures and will make efforts to achieve full interoperability. The system will be tested on two very challenging test beds such as: a highway-bridge and a railway tunnel. The system will be based on clear end-user requirements, coming from representative end-users and technological choices will be based on a long term cost-benefit analysis. Then, a dissemination plan was included into the project to encourage a wide range of public institutions and private companies to evaluate and adopt our approach for real-time control and distributed monitoring also in the more general framework of critical and civil infrastructure management and protection. Finally, an exploitation plan will develop for the commercialization of any derived technology, software, or monitoring concepts. ISTIMES project is carried out by an international partnership formed by nine partners coming from seven countries: Tecnologie per le Osservazioni della Terra (TeRN), Elsag Datamat (ED) and Dipartimento della Protezione Civile (DPC) from Italy

  11. Manufacturing of Wearable Sensors for Human Health and Performance Monitoring

    Science.gov (United States)

    Alizadeh, Azar

    2015-03-01

    Continuous monitoring of physiological and biological parameters is expected to improve performance and medical outcomes by assessing overall health status and alerting for life-saving interventions. Continuous monitoring of these parameters requires wearable devices with an appropriate form factor (lightweight, comfortable, low energy consuming and even single-use) to avoid disrupting daily activities thus ensuring operation relevance and user acceptance. Many previous efforts to implement remote and wearable sensors have suffered from high cost and poor performance, as well as low clinical and end-use acceptance. New manufacturing and system level design approaches are needed to make the performance and clinical benefits of these sensors possible while satisfying challenging economic, regulatory, clinical, and user-acceptance criteria. In this talk we will review several recent design and manufacturing efforts aimed at designing and building prototype wearable sensors. We will discuss unique opportunities and challenges provided by additive manufacturing, including 3D printing, to drive innovation through new designs, faster prototyping and manufacturing, distributed networks, and new ecosystems. We will also show alternative hybrid self-assembly based integration techniques for low cost large scale manufacturing of single use wearable devices. Coauthors: Prabhjot Singh and Jeffrey Ashe.

  12. The Web Based Monitoring Project at the CMS Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Lopez-Perez, Juan Antonio [Fermilab; Badgett, William [Fermilab; Behrens, Ulf [DESY; Chakaberia, Irakli [Kansas State U.; Jo, Youngkwon [Korea U.; Maeshima, Kaori; Maruyama, Sho [Fermilab; Patrick, James [Fermilab; Rapsevicius, Valdas [Fermilab; Soha, Aron [Fermilab; Stankevicius, Mantas [Fermilab; Sulmanas, Balys [Fermilab; Toda, Sachiko [Kansas State U.; Wan, Zongru [Kansas State U.

    2016-01-01

    The Compact Muon Solenoid is a large a complex general purpose experiment at the CERN Large Hadron Collider (LHC), built and maintained by many collaborators from around the world. Efficient operation of the detector requires widespread and timely access to a broad range of monitoring and status information. To the end the Web Based Monitoring (WBM) system was developed to present data to users located anywhere from many underlying heterogeneous sources, from real time messaging systems to relational databases. This system provides the power to combine and correlate data in both graphical and tabular formats of interest to the experimenters, including data such as beam conditions, luminosity, trigger rates, detector conditions, and many others, allowing for flexibility on the user’s side. This paper describes the WBM system architecture and describes how the system has been used from the beginning of data taking until now (Run1 and Run 2).

  13. All Sky Cloud Coverage Monitoring for SONG-China Project

    Science.gov (United States)

    Tian, J. F.; Deng, L. C.; Yan, Z. Z.; Wang, K.; Wu, Y.

    2016-05-01

    In order to monitor the cloud distributions at Qinghai station, a site selected for SONG (Stellar Observations Network Group)-China node, the design of the proto-type of all sky camera (ASC) applied in Xinglong station is adopted. Both hardware and software improvements have been made in order to be more precise and deliver quantitative measurements. The ARM (Advanced Reduced Instruction Set Computer Machine) MCU (Microcontroller Unit) instead of PC is used to control the upgraded version of ASC. A much higher reliability has been realized in the current scheme. Independent of the positions of the Sun and Moon, the weather conditions are constantly changing, therefore it is difficult to get proper exposure parameters using only the temporal information of the major light sources. A realistic exposure parameters for the ASC can actually be defined using a real-time sky brightness monitor that is also installed at the same site. The night sky brightness value is a very sensitive function of the cloud coverage, and can be accurately measured by the sky quality monitor. We study the correlation between the exposure parameter and night sky brightness value, and give the mathematical relation. The images of the all sky camera are inserted into database directly. All sky quality images are archived in FITS format which can be used for further analysis.

  14. APD performance in a luminosity monitor at LEP

    Energy Technology Data Exchange (ETDEWEB)

    Bartolome, E.; Boix, G. E-mail: gaelle.boix@cern.ch; Casado, M.P.; Chmeissani, M.; Clemente, S.; Fernandez, E.; Garrido, L.; Lorenz, E.; Martinez, M.; Merino, G.; Riu, I.; Sanchez, F.; Wright, A

    2000-03-11

    Avalanche Photo-Diodes (APDs) are being used as optical readout elements in a sampling electromagnetic calorimeter made of alternate layers of tungsten and plastic scintillators. The calorimeter serves as a small-angle luminosity monitor in the stray magnetic field of the ALEPH detector at LEP (CERN). Its scintillators are coupled both to APDs and conventional PMTs simultaneously via wavelength shifter fibres. In this paper we present results on the overall performance of the APDs, including gain and stability versus time and energy, based on the direct comparison of the two photosensitive devices.

  15. APD performance in a luminosity monitor at LEP

    Science.gov (United States)

    Bartolomé, E.; Boix, G.; Casado, M. P.; Chmeissani, M.; Clemente, S.; Fernández, E.; Garrido, L.; Lorenz, E.; Martínez, M.; Merino, G.; Riu, I.; Sánchez, F.; Wright, A.

    2000-03-01

    Avalanche Photo-Diodes (APDs) are being used as optical readout elements in a sampling electromagnetic calorimeter made of alternate layers of tungsten and plastic scintillators. The calorimeter serves as a small-angle luminosity monitor in the stray magnetic field of the ALEPH detector at LEP (CERN). Its scintillators are coupled both to APDs and conventional PMTs simultaneously via wavelength shifter fibres. In this paper we present results on the overall performance of the APDs, including gain and stability versus time and energy, based on the direct comparison of the two photosensitive devices.

  16. APD performance in a luminosity monitor at LEP

    CERN Document Server

    Bartolomé, E; Casado, M P; Chmeissani, M; Clemente, S; Fernández, E; Garrido, L; Lorenz, E; Martínez, M; Merino, G; Riu, I; Sánchez, F; Wright, A

    2000-01-01

    Avalanche photo-diodes (APDs) are being used as optical readout elements in a sampling electromagnetic calorimeter made of alternate layers of tungsten and plastic scintillators. The calorimeter serves as a small-angle luminosity monitor in the stray magnetic field of the ALEPH detector at LEP (CERN). Its scintillators are coupled both to APDs and conventional PMTs simultaneously via wavelength shifter fibres. In this paper we present results on the overall performance of the APDs, including gain and stability versus time and energy, based on the direct comparison of the two photosensitive devices. (6 refs).

  17. Evaluation of Activity Recognition Algorithms for Employee Performance Monitoring

    Directory of Open Access Journals (Sweden)

    Mehreen Mumtaz

    2012-09-01

    Full Text Available Successful Human Resource Management plays a key role in success of any organization. Traditionally, human resource managers rely on various information technology solutions such as Payroll and Work Time Systems incorporating RFID and biometric technologies. This research evaluates activity recognition algorithms for employee performance monitoring. An activity recognition algorithm has been implemented that categorized the activity of employee into following in to classes: job activities and non-job related activities. Finally, the algorithm will compute the time which employee spent in job related and non-job related activities. This paper presents a novel architecture based upon video analytics that can facilitate Human Resource Managers in real time.

  18. YUCSA: A CLIPS expert database system to monitor academic performance

    Science.gov (United States)

    Toptsis, Anestis A.; Ho, Frankie; Leindekar, Milton; Foon, Debra Low; Carbonaro, Mike

    1991-01-01

    The York University CLIPS Student Administrator (YUCSA), an expert database system implemented in C Language Integrated Processing System (CLIPS), for monitoring the academic performance of undergraduate students at York University, is discussed. The expert system component in the system has already been implemented for two major departments, and it is under testing and enhancement for more departments. Also, more elaborate user interfaces are under development. We describe the design and implementation of the system, problems encountered, and immediate future plans. The system has excellent maintainability and it is very efficient, taking less than one minute to complete an assessment of one student.

  19. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard D.; Barber, David S.; Betsill, J. David; Littlfield, Adriane C.; Mohagheghi, Amir H.; Shanks, Sonoya T.; Yuldashev, Bekhzad; Salikhbaev, Umar; Radyuk, Raisa; Djuraev, Akram; Djuraev, Amwar; Vasilev, Ivan; Tolongutov, Bajgabyl; Valentina, Alekhina; Solodukhin, Vladimir; Pozniak, Victor

    2002-04-02

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

  20. Improved effectiveness of performance monitoring in amateur instrumental musicians.

    Science.gov (United States)

    Jentzsch, Ines; Mkrtchian, Anahit; Kansal, Nayantara

    2014-01-01

    Here we report a cross-sectional study investigating the influence of instrumental music practice on the ability to monitor for and respond to processing conflicts and performance errors. Behavioural and electrophysiological indicators of response monitoring in amateur musicians with various skill levels were collected using simple conflict tasks. The results show that instrumental musicians are better able than non-musicians to detect conflicts and errors as indicated by systematic increases in the amplitude of the error-related negativity and the N200 with increasing levels of instrumental practice. Also, high levels of musical training were associated with more efficient and less reactive responses after experience of conflicts and errors as indicated by reduced post-error interference and post-conflict processing adjustments. Together, the present findings suggest that playing a musical instrument might improve the ability to monitor our behavior and adjust our responses effectively when needed. As these processes are amongst the first to be affected by cognitive aging, our evidence could promote musical activity as a realistic intervention to slow or even prevent age-related decline in frontal cortex mediated executive functioning. © 2013 Published by Elsevier Ltd.

  1. Monitoring and analyzing features of electrical power quality system performance

    Directory of Open Access Journals (Sweden)

    Genci Sharko

    2010-06-01

    Full Text Available Power quality is a set of boundaries that allows electrical systems to function in their intended manner without significant loss of performance or life. The term is used to describe electric power that drives an electrical load and the load's ability to function properly with that electric power. Without the proper quality of the power, an electrical device may malfunction, fail prematurely or not operate at all. There are many reasons why the electric power can be of poor quality and many more causes of such poor quality power. Power quality of power systems, which affects all connected electrical and electronic equipment, is a measure of deviations in voltages, currents, frequency, temperatures, winding forces and torques of particular supply systems and their components. In recent years, a considerable increase in nonlinear loads has been experienced; in particular distributed loads, such as computers, monitors and lighting, and distributed sources. The aim of this paper is to display a way of monitoring and analyzing features of electrical power quality system. As a monitoring example is taken output from power transformer rated at 320 kVA, part of distribution grid of Durres City in Albania.

  2. Subsurface Characterization and Seismic Monitoring for the Southwest Partnerships Phase III Demonstration Project at Farnsworth Field, TX

    Science.gov (United States)

    Will, R. A.; Balch, R. S.

    2015-12-01

    The Southwest Partnership on Carbon Sequestration is performing seismic based characterization and monitoring activities at an active CO2 EOR project at Farnsworth Field, Texas. CO2 is anthropogenically sourced from a fertilizer and an ethanol plant. The field has 13 CO2 injectors and has sequestered 302,982 metric tonnes of CO2 since October 2013. The field site provides an excellent laboratory for testing a range of monitoring technologies in an operating CO2 flood since planned development is sequential and allows for multiple opportunities to record zero CO2 baseline data, mid-flood data, and fully flooded data. The project is comparing and contrasting several scales of seismic technologies in order to determine best practices for large scale commercial sequestration projects. Characterization efforts include an 85 km2 3D surface seismic survey, baseline and repeat 3D VSP surveys centered on injection wells, cross-well tomography baseline and repeat surveys between injector/producer pairs, and a borehole passive seismic array to monitor induced seismicity. All surveys have contributed to detailed geologic models which were then used for fluid flow and risk assessment simulations. 3D VSP and cross-well data with repeat surveys have allowed for direct comparisons of the reservoir prior to CO2 injection and at eight months into injection, with a goal of imaging the CO2 plume as it moves away from injection wells. Additional repeat surveys at regular intervals will continue to refine the plume. The goal of this work is to demonstrate seismic based technologies to monitor CO2 sequestration projects, and to contribute to best practices manuals for commercial scale CO2 sequestration projects. In this talk the seismic plan will be outlined, progress towards goals enumerated, and preliminary results from baseline and repeat seismic data will be discussed. Funding for this project is provided by the U.S. Department of Energy under Award No. DE-FC26-05NT42591.

  3. SHynergie: Development of a virtual project laboratory for monitoring hydraulic stimulations

    Science.gov (United States)

    Renner, Jörg; Friederich, Wolfgang; Meschke, Günther; Müller, Thomas; Steeb, Holger

    2016-04-01

    Hydraulic stimulations are the primary means of developing subsurface reservoirs regarding the extent of fluid transport in them. The associated creation or conditioning of a system of hydraulic conduits involves a range of hydraulic and mechanical processes but also chemical reactions, such as dissolution and precipitation, may affect the stimulation result on time scales as short as hours. In the light of the extent and complexity of these processes, the steering potential for the operator of a stimulation critically depends on the ability to integrate the maximum amount of site-specific information with profound process understanding and a large spectrum of experience. We report on the development of a virtual project laboratory for monitoring hydraulic stimulations within the project SHynergie (http://www.ruhr-uni-bochum.de/shynergie/). The concept of the laboratory envisioned product that constitutes a preparing and accompanying rather than post-processing instrument ultimately accessible to persons responsible for a project over a web-repository. The virtual laboratory consists of a data base, a toolbox, and a model-building environment. Entries in the data base are of two categories. On the one hand, selected mineral and rock properties are provided from the literature. On the other hand, project-specific entries of any format can be made that are assigned attributes regarding their use in a stimulation problem at hand. The toolbox is interactive and allows the user to perform calculations of effective properties and simulations of different types (e.g., wave propagation in a reservoir, hydraulic test). The model component is also hybrid. The laboratory provides a library of models reflecting a range of scenarios but also allows the user to develop a site-specific model constituting the basis for simulations. The laboratory offers the option to use its components following the typical workflow of a stimulation project. The toolbox incorporates simulation

  4. Suncatcher Monitoring Project. Final report, September 1, 1977-December 31, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Maeda, B.T.; Grant, P.W.; Anson, R.D.

    1979-08-01

    The Suncatcher Monitoring Project has to date accumulated a wide variety of data on the Nittler/Maeda Suncatcher house in Davis, California, designed by Living Systems. Highlights of the data indicate 70% solar heating during 1978 despite unusually adverse winter weather conditons and a 40% increase of solar energy in winter through clerestory glazing as compared to ordinary south glazing. The data acquisition system (DAS) only worked intermittently during 1978, but hourly data was gathered during several intervals and daily data was virtually continuous. As a back-up to this hourly gathering of data hand read data was taken daily from September 1977 to the present. This manually collected data has allowed a reliable estimate of the Suncatcher house's performance. Summer data on Suncatcher window performance has been collected for comparison purposes, but budget constraints have delayed completion of computer modeling of the Suncatcher performance. Comparison of the overall Suncatcher's performance with the estimation models, SOLEST and LASL6, and simulation model, SOLSIM, appear accurate, although completion of the reflector enhancement algorithm remains desirable.

  5. Meshat: Monitoring and Experience Sharing Tool for Project-Based Learning

    CERN Document Server

    Michel, Christine

    2009-01-01

    Our work aims at studying tools offered to learners and tutors involved in face-to-face or blended project-based learning activities. To understand better the needs and expectations of each actor, we are especially interested in the specific case of project management training. The results of a course observation show that the lack of monitoring and expertise transfer tools involves important dysfunctions in the course organisation and therefore dissatisfaction for tutors and students (in particular about the acquisition of knowledge and expertise). So as to solve this problem, we propose a personalised platform (according to the actor: project group, student or tutor) which gives information to monitor activities and supports the acquisition and transfer of expertise. This platform is meant for the complex educational context of project-based learning. Indeed, as for the majority of project-based learning activities, the articulation conceptualisation-experiment is an important part of the process. The origi...

  6. Performance Evaluation of Industrial Hygiene Air Monitoring Sensors

    Energy Technology Data Exchange (ETDEWEB)

    Maughan, A D.; Glissmeyer, John A.; Birnbaum, Jerome C.

    2004-12-10

    Tests were performed to evaluate the accuracy, precision and response time of certain commercially available handheld toxic gas monitors. The tests were conducted by PNNL in the Chemical Chamber Test Facility for CH2MHill Hanford Company. The instruments were tested with a set of dilute test gases including ammonia, nitrous oxide, and a mixture of organic vapors (acetone, benzene, ethanol, hexane, toluene and xylene). The certified gases were diluted to concentrations that may be encountered in the outdoor environment above the underground tank farms containing radioactive waste at the U.S. Department of Energy's Hanford site, near Richland, Washington. The challenge concentrations are near the lower limits of instrument sensitivity and response time. The performance test simulations were designed to look at how the instruments respond to changes in test gas concentrations that are similar to field conditions.

  7. High Performance Computing tools for the Integrated Tokamak Modelling project

    Energy Technology Data Exchange (ETDEWEB)

    Guillerminet, B., E-mail: bernard.guillerminet@cea.f [Association Euratom-CEA sur la Fusion, IRFM, DSM, CEA Cadarache (France); Plasencia, I. Campos [Instituto de Fisica de Cantabria (IFCA), CSIC, Santander (Spain); Haefele, M. [Universite Louis Pasteur, Strasbourg (France); Iannone, F. [EURATOM/ENEA Fusion Association, Frascati (Italy); Jackson, A. [University of Edinburgh (EPCC) (United Kingdom); Manduchi, G. [EURATOM/ENEA Fusion Association, Padova (Italy); Plociennik, M. [Poznan Supercomputing and Networking Center (PSNC) (Poland); Sonnendrucker, E. [Universite Louis Pasteur, Strasbourg (France); Strand, P. [Chalmers University of Technology (Sweden); Owsiak, M. [Poznan Supercomputing and Networking Center (PSNC) (Poland)

    2010-07-15

    Fusion Modelling and Simulation are very challenging and the High Performance Computing issues are addressed here. Toolset for jobs launching and scheduling, data communication and visualization have been developed by the EUFORIA project and used with a plasma edge simulation code.

  8. [Puente Project Students' Performance.] Report on Spring 1988 Sabbatical Leave.

    Science.gov (United States)

    Saucedo, Marcelino

    A study was undertaken to examine the performance of Puente Project students compared to that of Mexican-American students and Anglo-American students in community colleges. Surveys and interviews with Puente counselors were conducted to explore methods and techniques used to deal with potential dropouts. A comparison was made of the number of…

  9. CEM ultrasonic flow monitoring design, installation and certification results at the Salt River Project

    Energy Technology Data Exchange (ETDEWEB)

    Rihs, P.W. [Salt River Project, Saint Johns, AZ (United States). Coronado Generating Station

    1995-12-31

    This presentation will include Salt River Project`s design, installation, experiences and results using ultrasonic flow monitoring equipment for certification of continuous emissions monitoring systems. Flow Monitoring is the newest and has been the most controversial component of CEM systems. Experience in measuring flue gas volumetric flow prior to CEMs was very limited. There are currently three basic techniques used to measure gas flow: (1) thermal sensing using hotwire anemometer or thermal dispersion; (2) differential pressure (pitot tube and annubar); (3) acoustic using ultrasonic transducers. The Salt River Project (SRP) operates a variety of affected generating stations: coal, gas and oil. Ultrasonic flow monitoring technology was chosen for all affected generating stations which the author operates. SRP`s approach and reasoning for choosing ultrasonic systems will be discussed. A review of each generating station`s flow monitoring system will be presented. The presentation will include, but may not be limited to, the following: general facilities, description and schematics; physical installations, plan and section drawings; design considerations; results of flow monitors certification testing; and CEMs Project Manager`s conclusions.

  10. TWENTY-ONE-YEAR EXTENSION PROJECT PERFORMANCE "LET'S BREASTFEEDING, MOMMY?"

    Directory of Open Access Journals (Sweden)

    Marizete Argolo Teixeira

    2017-05-01

    Full Text Available Research aiming to describe the actions that were developed by the Extension Project "Let's breastfeed, Mom?" During the 21 years of its performance in Jequié / Bahia and identify the difficulties, facilities and progress of the project. This is a descriptive, quantitative-qualitative study. The data were collected in the archived project documents, analyzed through descriptive statistics and content analysis. The results showed that 8,923 registered postpartum women with educational activities and 1,313 domiciliary visits were carried out, as the main actions carried out by the project. The difficulties were: lack of consumer / permanent materials and human resources; As facilities: responsibility and commitment of the members of the project, as well as the support of the transportation service of the institution. The advances were the elaboration of the research project, with insertion of research fellows, creation of the webpage and the logo. It is necessary to reflect on the difficulties and propose measures to remedy them and thus continue to contribute to the promotion, protection and support of breastfeeding in the Municipality, contributing to the reduction of infant morbidity and mortality

  11. Smart Tape For Structural Health Monitoring of Rocket Engines Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Acellent Technologies, Inc. proposes to develop a SMART TAPE system that can be used to perform rapid non-destructive evaluation in real time and provide long-term...

  12. SMART Tape For Structural Health Monitoring of Rocket Engines Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Acellent Technologies, Inc. proposes to develop a SMART Tape system that can be used to perform rapid non-destructive evaluation in real time and provide long-term...

  13. Self-Assembled Nanostructured Health Monitoring Sensors Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the proposed NASA SBIR program is to design, fabricate and evaluate the performance of self-assembled nanostructured sensors for the health...

  14. Chesapeake Bay Water Quality Monitoring Using Satellite Imagery Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Work done at Water Resources Center, University of Minnesota has demonstrated the feasibility of performing regional assessment of lake water quality using Landsat...

  15. Monitoring the tracking performance of the ATLAS trigger for electrons in Z->ee decays

    CERN Document Server

    Langford, Jonathon

    2016-01-01

    This project was carried out to develop an algorithm which monitors the performance of the tracking system in the ATLAS trigger. The algorithm uses tag and probe methods to measure the efficiency of the tracking for electrons by looking at Z → ee candidates. Once this method is validated, the ultimate goal is to implement the algorithm into the High-Level-Trigger (HLT) of ATLAS whilst online. The advantage of this technique over traditional offline monitoring is continuous feedback during data taking and higher available statistics. In this report the results of an offline analysis are presented, showing electron tracking efficiencies between 96% and 99% across almost all regions of the inner detector (run 306278).

  16. Practical tests for monitoring performance, fatigue and recovery in triathletes.

    Science.gov (United States)

    Coutts, Aaron J; Slattery, Katie M; Wallace, Lee K

    2007-12-01

    Few studies have described simple tests which can be used to provide an early warning of overreaching. The purpose of this study was to examine selected practical tests for monitoring changes in performance, fatigue and recovery of endurance athletes. Sixteen male triathletes were randomly assigned into matched groups. The normal training (NT) and intensified training (IT) groups completed 4 weeks of training followed by a 2-week taper. Physiological measures were taken pre- and post-overload and post-taper periods during an incremental treadmill test to exhaustion. Performance was assessed weekly using a 3-km run time trial (3 kmTT). Five-bound jump for distance (5BT) and submaximal running heart rate (HR(submax)) test were measured twice weekly and the Daily Analyses of Life Demands for Athletes (DALDA) were recorded. During the overload training period, the IT group completed approximately 290% more training load than the NT group (ptaper, the IT group improved 3 kmTT. In contrast, the performance, physiological and psychological markers of NT group remained relatively unchanged throughout the 6-week training period. There were weak significant correlations between weekly changes in 3 kmTT and 5BT (r=-0.37, p<0.01). The DALDA and 5BT may be practical tests for assessing changes in performance, fatigue and recovery of endurance athletes.

  17. 1997 Performance Testing of Multi-Metal Continuous Emissions Monitors

    Energy Technology Data Exchange (ETDEWEB)

    Sky +, Inc.

    1998-09-01

    Five prototype and two commercially available multi-metals continuous emissions monitors (CEMs) were tested in September 1997 at the Rotary Kiln Incinerator Simulator facility at the EPA National Risk Management Research Laboratory, Research Triangle Park, North Carolina. The seven CEMs were tested side by side in a long section of duct following the secondary combustion chamber of the RKIS. Two different concentrations of six toxic metals were introduced into the incinerator-approximately 15 and 75 µg/dscm of arsenic, beryllium, cadmium, chromium, lead, and mercury (We also tested for antimony but we are not reporting on it here because EPA recently dropped antimony from the list of metals addressed by the draft MACT rule). These concentrations were chosen to be close to emission standards in the draft MACT rule and the estimated Method Detection Limit (MDL) required of a CEM for regulatory compliance purposes. Results from this test show that no CEMs currently meet the performance specifications in the EPA draft MACT rule for hazardous waste incinerators. Only one of the CEMs tested was able to measure all six metals at the concentrations tested. Even so, the relative accuracy of this CEM varied between 35% and 100%, not 20% or less as required in the EPA performance specification. As a result, we conclude that no CEM is ready for long-term performance validation for compliance monitoring applications. Because sampling and measuring Hg is a recurring problem for multi-metal CEMs as well as Hg CEMs, we recommended that developers participate in a 1998 DOE-sponsored workshop to solve these and other common CEM measurement issues.

  18. Handbook to guide the measurement and monitoring of project effectiveness and impact

    Energy Technology Data Exchange (ETDEWEB)

    1986-09-15

    This handbook demonstrates the application of a tool for measuring and monitoring the impact of a development project in the Department of Quezaltenango, Guatemala. That project itself presently is a demonstration. It explores the technical feasibility and the commercial possibilities of direct geothermal heat applications to the processing of agricultural produce - with the eventual purpose of expanding agricultural exports from Guatemala. The handbook focuses on an early stage of the geothermal initiative and guides preparations for future impact measurement and monitoring of geothermal projects. Primarily, guidance is for projects in agricultural applications of geothermal heat - and basically in Quezaltenango. But the exercise and the handbook are relevant in broad outline to other, industrial applications projects as well which may be based in other departments and have immediate impact across the whole country. This handbook attempts to prepare geothermal energy planners in Guatemala for that juncture when geothermal projects can be managed by objectives. It promotes and facilitates thinking about defining specific objectives for projects that result from the demonstration at Zunil (in Quezaltenango Department); and it prompts preparations for obtaining baseline measurements and for making rational projections on the achievements of future projects.

  19. Biomass Performance : Monitoring and Control in Pharmaceutical Production

    OpenAIRE

    Neeleman, R.

    2002-01-01

    The primary concern in the pharmaceutical industry is not the optimisation of product yield or the reduction of manufacturing cost, but the production of a product of consistently high quality. This has resulted in 'process monitoring' becoming an integral part of process operation. In this thesis process monitoring is one of the central themes, from monitoring the environment of the micro-organisms to monitoring the micro-organisms themselves. The latter is called monitoring biomass performa...

  20. Performance Monitoring of Residential Hot Water Distribution Systems

    Energy Technology Data Exchange (ETDEWEB)

    Liao, Anna; Lanzisera, Steven; Lutz, Jim; Fitting, Christian; Kloss, Margarita; Stiles, Christopher

    2014-08-11

    Current water distribution systems are designed such that users need to run the water for some time to achieve the desired temperature, wasting energy and water in the process. We developed a wireless sensor network for large-scale, long time-series monitoring of residential water end use. Our system consists of flow meters connected to wireless motes transmitting data to a central manager mote, which in turn posts data to our server via the internet. This project also demonstrates a reliable and flexible data collection system that could be configured for various other forms of end use metering in buildings. The purpose of this study was to determine water and energy use and waste in hot water distribution systems in California residences. We installed meters at every end use point and the water heater in 20 homes and collected 1s flow and temperature data over an 8 month period. For a typical shower and dishwasher events, approximately half the energy is wasted. This relatively low efficiency highlights the importance of further examining the energy and water waste in hot water distribution systems.

  1. Radio Synthesis Imaging - A High Performance Computing and Communications Project

    Science.gov (United States)

    Crutcher, Richard M.

    The National Science Foundation has funded a five-year High Performance Computing and Communications project at the National Center for Supercomputing Applications (NCSA) for the direct implementation of several of the computing recommendations of the Astronomy and Astrophysics Survey Committee (the "Bahcall report"). This paper is a summary of the project goals and a progress report. The project will implement a prototype of the next generation of astronomical telescope systems - remotely located telescopes connected by high-speed networks to very high performance, scalable architecture computers and on-line data archives, which are accessed by astronomers over Gbit/sec networks. Specifically, a data link has been installed between the BIMA millimeter-wave synthesis array at Hat Creek, California and NCSA at Urbana, Illinois for real-time transmission of data to NCSA. Data are automatically archived, and may be browsed and retrieved by astronomers using the NCSA Mosaic software. In addition, an on-line digital library of processed images will be established. BIMA data will be processed on a very high performance distributed computing system, with I/O, user interface, and most of the software system running on the NCSA Convex C3880 supercomputer or Silicon Graphics Onyx workstations connected by HiPPI to the high performance, massively parallel Thinking Machines Corporation CM-5. The very computationally intensive algorithms for calibration and imaging of radio synthesis array observations will be optimized for the CM-5 and new algorithms which utilize the massively parallel architecture will be developed. Code running simultaneously on the distributed computers will communicate using the Data Transport Mechanism developed by NCSA. The project will also use the BLANCA Gbit/s testbed network between Urbana and Madison, Wisconsin to connect an Onyx workstation in the University of Wisconsin Astronomy Department to the NCSA CM-5, for development of long

  2. Performance of a reentrant cavity beam position monitor

    Directory of Open Access Journals (Sweden)

    Claire Simon

    2008-08-01

    Full Text Available The beam-based alignment and feedback systems, essential operations for the future colliders, require high resolution beam position monitors (BPMs. In the framework of the European CARE/SRF program, a reentrant cavity BPM with its associated electronics was developed by the CEA/DSM/Irfu in collaboration with DESY. The design, the fabrication, and the beam test of this monitor are detailed within this paper. This BPM is designed to be inserted in a cryomodule, work at cryogenic temperature in a clean environment. It has achieved a resolution better than 10  μm and has the possibility to perform bunch to bunch measurements for the x-ray free electron laser (X-FEL and the International Linear Collider (ILC. Its other features are a small size of the rf cavity, a large aperture (78 mm, and an excellent linearity. A first prototype of a reentrant cavity BPM was installed in the free electron laser in Hamburg (FLASH, at Deutsches Elektronen-Synchrotron (DESY and demonstrated its operation at cryogenic temperature inside a cryomodule. The second, installed, also, in the FLASH linac to be tested with beam, measured a resolution of approximately 4  μm over a dynamic range ±5  mm in single bunch.

  3. Performance of a reentrant cavity beam position monitor

    Energy Technology Data Exchange (ETDEWEB)

    Simon, C.; Luong, M.; Chel, S.; Napoly, O.; Novo, J.; Roudier, D. [CEA Saclay, DSM, Irfu, SACM, F-91191 Gif Sur Yvette, (France); Rouviere, N. [CNRS, IN2P3-IPN, F-91406 Orsay, (France); Baboi, N.; Mildner, N.; Nolle, D. [DESY, D-22603 Hamburg, (Germany)

    2008-07-01

    The beam-based alignment and feedback systems, essential operations for the future colliders, require high resolution beam position monitors (BPMs). In the framework of the European CARE/SRF program, a reentrant cavity BPM with its associated electronics was developed by the CEA/DSM/Irfu in collaboration with DESY. The design, the fabrication, and the beam test of this monitor are detailed within this paper. This BPM is designed to be inserted in a cryo-module, work at cryogenic temperature in a clean environment. It has achieved a resolution better than 10 {mu}m and has the possibility to perform bunch to bunch measurements for the X-ray free electron laser (X-FEL) and the International Linear Collider (ILC). Its other features are a small size of the rf cavity, a large aperture (78 mm), and an excellent linearity. A first prototype of a reentrant cavity BPM was installed in the free electron laser in Hamburg (FLASH), at Deutsches Elektronen-Synchrotron (DESY) and demonstrated its operation at cryogenic temperature inside a cryo-module. The second, installed, also, in the FLASH linac to be tested with beam, measured a resolution of approximately 4 {mu}m over a dynamic range {+-} 5 mm in single bunch. (authors)

  4. The need for complementary hydraulic analysis in post-restoration monitoring of river restoration projects

    Science.gov (United States)

    Endreny, T. A.; Soulman, M. M.

    2011-03-01

    River restoration design methods are incrementally improved by studying and learning from monitoring data in previous projects. In this paper, we report post-restoration monitoring data for a Natural Channel Design (NCD) restoration project along 1600 m (10 channel wavelengths) of the Batavia Kill in the Catskill Mountains, NY, implemented in 2001 and 2002. The NCD project used a reference-reach to determine channel form, empirical relations between the project site and reference site bankfull dimensions to size channel geometry, and hydraulic and sediment computations to test channel capacity and sediment stability. In addition 12 cross-vanes and 48 j-hook vanes used in NCD for river training were installed to protect against bank erosion and maintain scour pools for fish habitat. Changes in pool depths were monitored with surveys from 2002-2004, and then after the channel-altering April 2005 flood. Aggradation in pools was attributed to cross-vane arms not concentrating flow in the center of the channel, which subsequently caused flow splitting and 4 partial point bar avulsions during the 2005 flood. Hydrodynamic simulation at the 18 m3s-1 bankfull flow suggested avulsions occurred where vanes allowed erosive bank scour to initiate the avulsion cut, and once the flow was split, the diminished in-channel flow caused more aggradation in the pools. In this project post-restoration monitoring had detected aggradation and considered it a problem. The lesson for the larger river restoration community is monitoring protocol should include complementary hydraulic and sediment analysis to comprehend potential consequences and develop preventative maintenance. River restoration and monitoring teams should be trained in robust hydraulic and sediment analytical methods that help them extend project restoration goals.

  5. The need for complementary hydraulic analysis in post-restoration monitoring of river restoration projects

    Directory of Open Access Journals (Sweden)

    T. A. Endreny

    2011-03-01

    Full Text Available River restoration design methods are incrementally improved by studying and learning from monitoring data in previous projects. In this paper, we report post-restoration monitoring data for a Natural Channel Design (NCD restoration project along 1600 m (10 channel wavelengths of the Batavia Kill in the Catskill Mountains, NY, implemented in 2001 and 2002. The NCD project used a reference-reach to determine channel form, empirical relations between the project site and reference site bankfull dimensions to size channel geometry, and hydraulic and sediment computations to test channel capacity and sediment stability. In addition 12 cross-vanes and 48 j-hook vanes used in NCD for river training were installed to protect against bank erosion and maintain scour pools for fish habitat. Changes in pool depths were monitored with surveys from 2002–2004, and then after the channel-altering April 2005 flood. Aggradation in pools was attributed to cross-vane arms not concentrating flow in the center of the channel, which subsequently caused flow splitting and 4 partial point bar avulsions during the 2005 flood. Hydrodynamic simulation at the 18 m3s−1 bankfull flow suggested avulsions occurred where vanes allowed erosive bank scour to initiate the avulsion cut, and once the flow was split, the diminished in-channel flow caused more aggradation in the pools. In this project post-restoration monitoring had detected aggradation and considered it a problem. The lesson for the larger river restoration community is monitoring protocol should include complementary hydraulic and sediment analysis to comprehend potential consequences and develop preventative maintenance. River restoration and monitoring teams should be trained in robust hydraulic and sediment analytical methods that help them extend project restoration goals.

  6. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd (Washington Department of Fish and Wildlife, Olympia, WA)

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  7. The INSIDE project: on-line monitoring and simulation validation with the in-beam PET scanner

    Science.gov (United States)

    Ferrero, V.; INSIDE Collaboration

    2017-05-01

    The quality assurance of particle therapy treatment is a fundamental issue that can be addressed by developing reliable monitoring techniques and indicators of the treatment plan accuracy. Monitoring using Position Emission Tomography (PET) systems is the only in-vivo non invasive technique employed clinically and has been carried out in particle therapy since 1997. However, the PET monitoring of β + emitter isotopes is typically done after the treatment, resulting in a large fraction of lost data because of the isotopes rapid physical decay. The INSIDE collaboration has recently installed an in-beam PET scanner at the Italian National Center of Oncologic Hadrontherapy in Pavia, Italy. Here, there is an ongoing project in order to start testing the method on patients. This work focuses on the online performances of the scanner with clinical beams.

  8. Operational Performance Analysis of Passive Acoustic Monitoring for Killer Whales

    Energy Technology Data Exchange (ETDEWEB)

    Matzner, Shari; Fu, Tao; Ren, Huiying; Deng, Zhiqun; Sun, Yannan; Carlson, Thomas J.

    2011-09-30

    For the planned tidal turbine site in Puget Sound, WA, the main concern is to protect Southern Resident Killer Whales (SRKW) due to their Endangered Species Act status. A passive acoustic monitoring system is proposed because the whales emit vocalizations that can be detected by a passive system. The algorithm for detection is implemented in two stages. The first stage is an energy detector designed to detect candidate signals. The second stage is a spectral classifier that is designed to reduce false alarms. The evaluation presented here of the detection algorithm incorporates behavioral models of the species of interest, environmental models of noise levels and potential false alarm sources to provide a realistic characterization of expected operational performance.

  9. Relation of project managers' personality and project performance: An approach based on value stream mapping

    Directory of Open Access Journals (Sweden)

    Maurizio Bevilacqua

    2014-09-01

    Full Text Available Purpose: This work investigates the influence of project managers’ personality on the success of a project in a Multinational Corporation. The methodology proposed for analyzing the project managers’ personality is based on the Myers-Briggs Type Indicator.Design/methodology/approach: Forty projects carried out in 2012 by multinational corporation, concerning new product development (NPD, have been analyzed, comparing the profile of project managers with results obtained in terms of traditional performance indexes (time delay and over-budget of projects and performance indexes usually used in “Lean Production” sector (waste time and type of “wastes”. A detailed analysis of the most important “wastes” during the project development is carried out using the Value Stream Mapping (VSM technique.Findings and Originality/value: Relying on the Myers–Briggs personality instrument, results show that extroverted managers (as opposed to introverted managers carry out projects that show lower delay and lower waste time. Introverted managers often make “Over-processing” and “Defect” types of waste. Moreover, lower delay and over-budget have been shown by perceiving managers.Research limitations: Regarding the limitations of this work it is necessary to highlight that we collected data from project managers in a retrospective way. While we believe that several aspects of our data collection effort helped enhance the accuracy of the results, future research could conduct real-time case study research to get more detailed insights into the proposed relationships and avoid retrospective bias. Moreover we focused on a single respondent, the project manager. This helped us ensure that their interpretations played an important role in product development. But, we cannot examined the opinion of team members that could be different from project managers opinion regarding some questions.Originality/value: This research provides insight useful

  10. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  11. MONDO Project: real time ocean monitoring through Lagrangian drifters during offshore drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Mafra, Tatiana [Eni Oil do Brasil, Rio de Janeiro, RJ (Brazil); Fragoso, Mauricio da Rocha; Santos, Francisco Alves dos; Cruz, Leonardo M. Marques A.; Pellegrini, Julio A.C.; Cerrone, Bruna Nogueira [Prooceano, Rio de Janeiro, RJ (Brazil); Assireu, Arcilan Trevenzoli [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos, SP (Brazil)

    2008-07-01

    Monitoring the ocean conditions during offshore operations is essential for both operational and environmental aspects. Environmentally, not only to know better the environment where the activity is taking place, but also to be able to provide fast and accurate response in case of accidents. MONDO Project (Monitoring by Ocean Drifters) is a pioneer initiative from ENI Oil do Brasil and PROOCEANO that aimed to monitor currents as a part of a metoceanographic data monitoring project of drilling operations in Brazilian Waters, in Santos Basin throughout September to November 2007, 40 satellite tracked ocean drifters were deployed will be transmitting data up to November 2008. The results of this project can be used to study a wide range of subjects about ocean dynamics. Following the principles of social and environmental responsibility, MONDO Project aims to benefit the local ecosystem in increasing the scientific knowledge of the area to calibrate hydrodynamic models that will lead to more accurate modeling results and, as a consequence, to a better management of contingency plans. Based on these principles, the project will also provide unrestricted access to oceanographic data even after the end of operations. (author)

  12. Harvard Observing Project monitoring of Boyajian's Star (KIC 8462852)

    Science.gov (United States)

    Schumer, Clea F.; Vanderburg, Andrew; Bieryla, Allyson; Carmichael, Theron; Garrison, Lehman H.; Huang, Jane; Lewis, John; Mayo, Andrew; Alam, Munazza; Gomez, Sebastian; Kamdar, Harshil; Yuan, Sihan; Cordova, Rodrigo

    2017-01-01

    Between 2009 and 2013, the Kepler spacecraft observed ~200,000 stars, repeatedly measuring their brightness to look for regular dimmings that could indicate the presence of a transiting planet (Borucki et al. 2010). This endeavor led to the discovery of thousands of planets. However, the data pertaining to one star, KIC 8462852, nicknamed “Tabby's Star” or “Boyajian's Star" indicated sporadic dimmings thought to be resulting from massive, evolving, and erratic shapes passing in front of the star (Boyajian et al. 2016, Wright and Sigurdsson 2016). Additional observations have indicated that KIC 8462852 has faded by approximately 20% over the past century (Wright and Sigurdsson 2016). Kepler is now observing other areas of space, and consequently, ground-based efforts have emerged in order to continue tracking the brightness of KIC 8462852. The Harvard Observing Project (HOP) is an observational astronomy initiative that engages undergraduate students and provides graduate students with the opportunity to lead sessions of data collection. During the fall 2016 semester, HOP will be observing KIC 8462852 in BVRI filters using Harvard's 16-inch DFM Clay telescope. We will present a light curve of the star spanning the course of three months.

  13. SAR interferometry monitoring along the ancient Rome City Walls -the PROTHEGO project case study

    Science.gov (United States)

    Carta, Cristina; Cimino, Maria gabriella; Leoni, Gabriele; Marcelli, Marina; Margottini, Claudio; Spizzichino, Daniele

    2017-04-01

    Led by the Italian Institute for Environmental Protection and Research, in collaboration with NERC British Geological Survey, Geological and Mining Institute of Spain, University of Milano-Bicocca and Cyprus University of Technology, the PROTHEGO project, co-funded in the framework of JPI on Cultural Heritage EU program (2015-2018), brings an innovative contribution towards the analysis of geo-hazards in areas of cultural heritage in Europe. The project apply InSAR techniques to monitor monuments and sites that are potentially unstable due to natural geo-hazard. After the remote sensing investigation, detailed geological interpretation, hazard analysis, local-scale monitoring, advanced modeling and field surveying for some case studies is implemented. The selected case studies are: the Alhambra in Granada (ES); the Choirokoitia village (CY); the Derwent Valley Mills (UK); the Pompei archaeological site and Historical centre of Rome (IT). In this work, in particular, we will focus on ground deformation measurements (obtained by satellite SAR Interferometry) and on their interpretation with respect to the ancient Rome City Walls. The research activities carried out jointly with the Superintendence's technicians, foresee the implementation of a dedicated web GIS platform as a final repository for data storage and spatial data elaboration. The entire circuit of the ancient city walls (both Mura Aureliane and Mura Gianicolensi), was digitalized and georeferenced. All the elements (towers, gates and wall segments) were drawn and collected in order to produce a map of elements at risk. A detailed historical analysis (during the last twenty years) of the ground and structural deformations were performed. A specific data sheet of ruptures was created and fulfilled in order to produce a geographic inventory of past damage. This data sheet contains the following attributes: triggering data; typology of damage; dimension, triggering mechanism; presence of restoration works

  14. Multimode Process Monitoring Based on Fuzzy C-means in Locality Preserving Projection Subspace

    Institute of Scientific and Technical Information of China (English)

    解翔; 侍洪波

    2012-01-01

    For complex industrial processes with multiple operational conditions, it is important to develop effective monitoring algorithms to ensure the safety of production processes. This paper proposes a novel monitoring strategy based on fuzzy C-means. The high dimensional historical data are transferred to a low dimensional subspace spanned by locality preserving projection. Then the scores in the novel subspace are classified into several overlapped clusters, each representing an operational mode. The distance statistics of each cluster are integrated though the membership values into a novel BID (Bayesian inference distance) monitoring index. The efficiency and effectiveness of the proposed method are validated though the Tennessee Eastman benchmark process.

  15. SKI SITE-94. Deep Repository Performance Assessment Project. Summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry`s R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is neither a safety assessment nor a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The main report (SKI-R--96-36) gives a detailed description of the many inter-related studies undertaken as part of the research project, while the present report presents a condensed summary of the main report. 46 refs.

  16. Summary of operations and performance of the Murdock site restoration project in 2008.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2009-06-04

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A.

  17. Performance testing of multi-metal continuous emissions monitors

    Energy Technology Data Exchange (ETDEWEB)

    Haas, W.J. [Ames Lab., IA (United States); French, N.B. [Sky+, Inc. (United States); Brown, C.H. [Oak Ridge National Lab., TN (United States); Burns, D.B. [Westinghouse Savannah River Co., Aiken, SC (United States); Lemieux, P.M.; Ryan, J.V. [National Risk Management Research Lab., Research Triangle Park, NC (United States); Priebe, S.J. [Idaho National Engineering and Environmental Lab., Idaho Falls, ID (United States); Waterland, L.R. [Acurex Environmental Corp. (United States)

    1997-11-17

    Three prototype multi-metals continuous emissions monitors (CEMs) were tested in April 1996 at the Rotary Kiln Incinerator Simulator facility at the US Environmental Protection Agency (EPA) National Risk Management Research Laboratory, Research Triangle Park, North Carolina. The CEM instruments were: Inductively Coupled Plasma-Atomic Emission Spectrometry (ICP-AES); Laser Induced Breakdown Spectrometry-Atomic Emission Spectroscopy (LIBS); and Laser Spark Spectrometry, another LIBS instrument. The three CEMs were tested simultaneously during test periods in which low, medium, and high concentration levels of seven toxic metals -- antimony, arsenic, beryllium, cadmium, chromium, lead, and mercury -- were maintained under carefully controlled conditions. Two methods were used to introduce the test metals into the flue gas: (1) solution atomization, introducing metal-containing aerosol directly into the secondary combustion burner, and (2) injection of fly ash particulates. The testing addressed four measures of CEM performance: relative accuracy (RA), calibration drift, zero drift, and response time. These were accomplished by comparing the toxic metal analyte concentrations reported by the CEMs to the concentrations measured using the EPA reference method (RM) for the same analytes. Overall, the test results showed the prototype nature of the test CEMs and the clear need for further development. None of the CEMs tested consistently achieved RA values of 20% or less as required by the EPA draft performance specification. Instrument size reduction and automation will also likely need additional attention before multi-metal CEMs systems become commercially available for service as envisioned by regulators and citizens.

  18. Monitoring and Evaluating Projects : A Step-by-Step Primer on Monitoring, Benchmarking, and Impact Evaluation

    OpenAIRE

    Rebekka E. Grun

    2006-01-01

    This paper attempts to be a practical step-by-step guide to prepare and carry out benchmarking and impact analyses of projects. It's purpose is to attempt to present analytical tools solidly grounded in economic theory all while focusing on the practical questions of evaluations. Little space is given to theory, in order to spend more time on the actual steps involved, trying to make this ...

  19. Sustainable and non-conventional monitoring systems to mitigate natural hazards in low income economies: the 4onse project approach.

    Science.gov (United States)

    Cannata, Massimiliano; Ratnayake, Rangajeewa; Antonovic, Milan; Strigaro, Daniele

    2017-04-01

    Environmental monitoring systems in low economies countries are often in decline, outdated or missing with the consequence that there is a very scarce availability and accessibility to these information that are vital for coping and mitigating natural hazards. Non-conventional monitoring systems based on open technologies may constitute a viable solution to create low cost and sustainable monitoring systems that may be fully developed, deployed and maintained at local level without lock-in dependances on copyrights or patents or high costs of replacements. The 4onse research project , funded under the Research for Development program of the Swiss National Science Foundation and the Swiss Office for Development and Cooperation, propose a complete monitoring system that integrates Free & Open Source Software, Open Hardware, Open Data, and Open Standards. After its engineering, it will be tested in the Deduru Oya catchment (Sri Lanka) to evaluate the system and develop a water management information system to optimize the regulation of artificial basins levels and mitigate flash floods. One of the objective is to better scientifically understand strengths, criticalities and applicabilities in terms of data quality; system durability; management costs; performances; sustainability. Results, challenges and experiences from the first six months of the projects will be presented with particular focus on the activities of synergies building and data collection and dissemination system advances.

  20. Eva Physiology, Systems, and Performance (EPSP) Project Overview

    Science.gov (United States)

    Gernhardt, Michael L.

    2007-01-01

    Extravehicular activity (EVA) is any activity performed by astronauts outside their space vehicle or habitat. EVA may be performed on orbit, such as outside the Space Shuttle or the International Space Station, or on a planetary surface such as Mars or on the moon. Astronauts wear a pressurized suit that provides environmental protection, mobility, life support, and communications while they work in the harsh conditions of a microgravity environment. Exploration missions to the moon and Mars may last many days and will include many types of EVAs; exploration, science, construction and maintenance. The effectiveness and success of these EVA-filled missions is dependent on the ability to perform tasks efficiently. The EVA Physiology, Systems and Performance (EPSP) project will conduct a number of studies to understand human performance during EVA, from a molecular level to full-scale equipment and suit design aspects, with the aim of developing safe and efficient systems for Exploration missions and the Constellation Program. The EPSP project will 1) develop Exploration Mission EVA suit requirements for metabolic and thermal loading, optional center of gravity location, biomedical sensors, hydration, nutrition, and human biomedical interactions; 2) develop validated EVA prebreathe protocols that meet medical, vehicle, and habitat constraints while minimizing crew time and thus increasing EVA work efficiency; and 3) define exploration decompression sickness (DCS) risks, policy, and mission success statistics and develop a DCS risk definition report.

  1. Shifting the Paradigm for Long Term Monitoring at Legacy Sites to Improve Performance while Reducing Cost

    Energy Technology Data Exchange (ETDEWEB)

    Eddy-Dilek, Carol A.; Looney, Brian B.; Seaman, John; Kmetz, Thomas

    2013-01-10

    A major issue facing many government and private industry sites that were previously contaminated with radioactive and chemical wastes is that often the sites cannot be cleaned up enough to permit unrestricted human access. These sites will require long-term management, in some cases indefinitely, leaving site owners with the challenge of protecting human health and environmental quality in a cost effective manner. Long-term monitoring of groundwater contamination is one of the largest projected costs in the life cycle of environmental management at the Savannah River Site (SRS), the larger DOE complex, and many large federal and private sites. Currently, most monitoring strategies are focused on laboratory measurements of contaminants measured in groundwater samples collected from wells. This approach is expensive, and provides limited and lagging information about the effectiveness of cleanup activities and the behavior of the residual contamination. Over the last twenty years, DOE and other federal agencies have made significant investments in the development of various types of sensors and strategies that would allow for remote analysis of contaminants in groundwater, but these approaches do not promise significant reductions in risk or cost. Scientists at SRS have developed a new paradigm to simultaneously improve the performance of long term monitoring systems while lowering the overall cost of monitoring. This alternative approach incorporates traditional point measurements of contaminant concentration with measurements of controlling variables including boundary conditions, master variables, and traditional plume/contaminant variables. Boundary conditions are the overall driving forces that control plume movement and therefore provide leading indication to changes in plume stability. These variables include metrics associated with meteorology, hydrology, hydrogeology, and land use. Master variables are the key variables that control the chemistry of the

  2. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Harris, Robin; King, Marty [Confederated Tribes of the Umatilla Indian Reservation

    2009-06-10

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho

  3. Protocols for Monitoring Habitat Restoration Projects in the Lower Columbia River and Estuary

    Energy Technology Data Exchange (ETDEWEB)

    Roegner, G. Curtis; Diefenderfer, Heida L.; Borde, Amy B.; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Zimmerman, Shon A.; Johnson, Gary E.

    2008-04-25

    Protocols for monitoring salmon habitat restoration projects are essential for the U.S. Army Corps of Engineers' environmental efforts in the Columbia River estuary. This manual provides state-of-the science data collection and analysis methods for landscape features, water quality, and fish species composition, among others.

  4. Preliminary evaluation of a prototype welfare monitoring system for sows and piglets (Welfare Quality (R) project)

    NARCIS (Netherlands)

    Scott, K.; Binnendijk, G.P.; Edwards, S.A.; Gu, J.H.; Wijhe-Kiezebrink, van M.C.; Vermeer, H.M.

    2009-01-01

    The Welfare Quality(R) project aims to develop a European on-form welfare assessment standard for pigs, amongst other species. A prototype monitoring system was developed for sows and piglets using predominantly animal-based measures of behaviour, health and physiology to assess welfare. The

  5. Modeling radiation conditions in orbits of projected system of small satellites for radiation monitoring

    Science.gov (United States)

    Panasyuk, M. I.; Podzolko, M. V.; Kovtyukh, A. S.; Osedlo, V. I.; Tulupov, V. I.; Yashin, I. V.

    2016-11-01

    Calculated estimates are presented for the accumulated radiation doses behind the shields of various thicknesses in the orbits of projected at Skobeltsyn Institute of Nuclear Physics, Moscow State University system of small satellites for radiation monitoring. The results are analyzed and compared with the calculation data for other actively exploited near-Earth orbits.

  6. Outcome mapping as methodology to monitor and evaluate community informatics projects: A case study

    CSIR Research Space (South Africa)

    Herselman, M

    2010-10-01

    Full Text Available The purpose of this paper is to indicate how Outcome Mapping (OM) can be used as a methodology to monitor and evaluate a specific developmental informatics project currently under way in the Meraka Institute. OM was applied in the Broadband for All...

  7. Preliminary evaluation of a prototype welfare monitoring system for sows and piglets (Welfare Quality (R) project)

    NARCIS (Netherlands)

    Scott, K.; Binnendijk, G.P.; Edwards, S.A.; Gu, J.H.; Wijhe-Kiezebrink, van M.C.; Vermeer, H.M.

    2009-01-01

    The Welfare Quality(R) project aims to develop a European on-form welfare assessment standard for pigs, amongst other species. A prototype monitoring system was developed for sows and piglets using predominantly animal-based measures of behaviour, health and physiology to assess welfare. The prototy

  8. Integrating a project monitoring system into a public health network: experiences from Alive & Thrive Vietnam.

    Science.gov (United States)

    Tuan, Nguyen Thanh; Alayon, Silvia; Do, Tran Thanh; Ngan, Tran Thi; Hajeebhoy, Nemat

    2015-01-01

    Little information is available about how to build a monitoring system to measure the output of preventive nutrition interventions, such as counselling on infant and young child feeding. This paper describes the Alive & Thrive Vietnam (A&T) project experience in nesting a large-scale project monitoring system into the existing public health information system (e.g. using the system and resources), and in using monitoring data to strengthen service delivery in 15 provinces with A&T franchises. From January 2012 to April 2014, the 780 A&T franchises provided 1,700,000 counselling contacts (~3/4 by commune franchises). In commune franchises in April 2014, 80% of mothers who were pregnant or with children under two years old had been to the counselling service at least one time, and 87% of clients had been to the service earlier. Monitoring data are used to track the progress of the project, make decisions, provide background for a costing study and advocate for the integration of nutrition counselling indicators into the health information system nationwide. With careful attention to the needs of stakeholders at multiple levels, clear data quality assurance measures and strategic feedback mechanisms, it is feasible to monitor the scale-up of nutrition programmes through the existing routine health information system.

  9. Performance assessment of the PNM Prosperity electricity storage project

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Dakota [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ellison, James F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bhatnagar, Dhruv [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Schoenwald, David A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-05-01

    The purpose of this study is to characterize the technical performance of the PNM Prosperity electricity storage project, and to identify lessons learned that can be used to improve similar projects in the future. The PNM Prosperity electricity storage project consists of a 500 kW/350 kWh advanced lead-acid battery with integrated supercapacitor (for energy smoothing) and a 250 kW/1 MWh advanced lead-acid battery (for energy shifting), and is co-located with a 500 kW solar photovoltaic (PV) resource. The project received American Reinvestment and Recovery Act (ARRA) funding. The smoothing system is e ective in smoothing intermittent PV output. The shifting system exhibits good round-trip efficiencies, though the AC-to-AC annual average efficiency is lower than one might hope. Given the current utilization of the smoothing system, there is an opportunity to incorporate additional control algorithms in order to increase the value of the energy storage system.

  10. Performance assessment of the PNM Prosperity electricity storage project :

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Dakota; Ellison, James F.; Bhatnagar, Dhruv; Schoenwald, David A.

    2014-05-01

    The purpose of this study is to characterize the technical performance of the PNM Prosperity electricity storage project, and to identify lessons learned that can be used to improve similar projects in the future. The PNM Prosperity electricity storage project consists of a 500 kW/350 kWh advanced lead-acid battery with integrated supercapacitor (for energy smoothing) and a 250 kW/1 MWh advanced lead-acid battery (for energy shifting), and is co-located with a 500 kW solar photovoltaic (PV) resource. The project received American Reinvestment and Recovery Act (ARRA) funding. The smoothing system is e ective in smoothing intermittent PV output. The shifting system exhibits good round-trip efficiencies, though the AC-to-AC annual average efficiency is lower than one might hope. Given the current utilization of the smoothing system, there is an opportunity to incorporate additional control algorithms in order to increase the value of the energy storage system.

  11. Air quality performed with satellite measurement within the QUITSAT project

    Science.gov (United States)

    Masieri, Samuele; Petritoli, Andrea; Premuda, Margarita; Kostadinov, Ivan; Bortoli, Daniele; Ravegnani, Fabrizio; Giovanelli, Giorgio

    Ground pollutants monitoring, using satellite observation, represents an interesting and high potential approach to air quality that could be inserted into Global monitoring systems. The QUITSAT Italian pilot project (air QUality with Integration of ground based and SAtellite measurements and chemical Transport and multiphase model), funded by the Italian Space Agency (ASI), proposes a new approach producing some interesting results in this frame. The approach focuses in the integration of the satellite observations (ENVISAT/SCIAMACHY and AURA/OMI) with the outputs of the GAMES (Gas Aerosol Modelling Evaluation System) chemical transport model, to provide the evaluation of the tropospheric profiles of some atmo-spheric compounds such as NO2 , O3 , HCHO and SO2 . This activity appears to be very useful to retrieve the surface concentration of trace gases from tropospheric columns of atmospheric compounds obtained with satellite instrumentation. The comparison with the in situ analyzer network over the Po' Valley shows a good correlation between the two data set. The corre-spondence can be improved taking into account also concentration gradients between different stations, classifying the ground base stations according to their rural or urban characteristics and considering the general orography of the ground. Results and methodology are presented and discussed.

  12. Monitoring systems and their effectiveness for project cost control in construction

    NARCIS (Netherlands)

    Al-Jibouri, Saad H.

    2002-01-01

    This paper reports on a research to investigate the effectiveness of some commonly used monitoring systems, in detecting deviations from the planned cost and performance. The monitoring systems used in this work are: Leading parameter technique Variances method Activity based ratios technique Th

  13. Distortion-Product Otoacoustic Emission Test Performance for Ototoxicity Monitoring

    Science.gov (United States)

    Reavis, Kelly M.; McMillan, Garnett; Austin, Donald; Gallun, Frederick; Fausti, Stephen A.; Gordon, Jane S.; Helt, Wendy J.; Konrad-Martin, Dawn

    2017-01-01

    Introduction A nonbehavioral method for monitoring ototoxicity in patients treated with cisplatin is needed because patients enduring chemotherapy may not be well or cooperative enough to undergo repeated hearing tests. Distortion-product otoacoustic emissions (DPOAEs) provide a nonbehavioral measure of auditory function that is sensitive to cisplatin exposure. However, interpreting DPOAE findings in the context of ototoxicity monitoring requires that their accuracy be determined in relation to a clinically accepted gold standard test. Objectives Among patients receiving cisplatin for the treatment of cancer, we sought to (1) identify the combination of DPOAE metrics and ototoxicity risk factors that best classified ears with and without ototoxic-induced hearing changes; and (2) evaluate the test performance achieved by the composite measure as well as by DPOAEs alone. Design Odds of experiencing hearing changes at a given patient visit were determined using data collected prospectively from 24 Veterans receiving cisplatin. Pure-tone thresholds were examined within an octave of each subject’s high-frequency hearing limit. DPOAE were collected as a set of four response growth (input/output) functions near the highest f2 frequency that yielded a robust response at L2 = L1 = 65 dB SPL. Logistic regression modeled the risk of hearing change using several DPOAE metrics, drug treatment factors, and other patient factors as independent variables. An optimal discriminant function was derived by reducing the model so that only statistically significant variables were included. Receiver operating characteristic curve analyses were used to evaluate test performance. Results At higher cisplatin doses, ears with better hearing at baseline were more likely to exhibit ototoxic hearing changes than those with poorer hearing. Measures of pre-exposure hearing, cumulative drug dose, and DPOAEs generated a highly accurate discriminant function with a cross-validated area under the

  14. Tehachapi Wind Energy Storage Project - Technology Performance Report #3

    Energy Technology Data Exchange (ETDEWEB)

    Pinsky, Naum [Southern California Edison, Rosemead, CA (United States); O' Neill, Lori [Southern California Edison, Rosemead, CA (United States)

    2017-03-31

    The TSP is located at SCE’s Monolith Substation in Tehachapi, California. The 8 MW, 4 hours (32 MWh) BESS is housed in a 6,300 square foot facility and 2 x 4 MW/4.5 MVA smart inverters are on a concrete pad adjacent to the BESS facility. The project will evaluate the capabilities of the BESS to improve grid performance and assist in the integration of large-scale intermittent generation, e.g., wind. Project performance was measured by 13 specific operational uses: providing voltage support and grid stabilization, decreasing transmission losses, diminishing congestion, increasing system reliability, deferring transmission investment, optimizing renewable-related transmission, providing system capacity and resources adequacy, integrating renewable energy (smoothing), shifting wind generation output, frequency regulation, spin/non-spin replacement reserves, ramp management, and energy price arbitrage. Most of the operations either shift other generation resources to meet peak load and other electricity system needs with stored electricity, or resolve grid stability and capacity concerns that result from the interconnection of intermittent generation. SCE also demonstrated the ability of lithium ion battery storage to provide nearly instantaneous maximum capacity for supply-side ramp rate control to minimize the need for fossil fuel-powered back-up generation. The project began in October, 2010 and will continue through December, 2016.

  15. Big Data solution for CTBT monitoring: CEA-IDC joint global cross correlation project

    Science.gov (United States)

    Bobrov, Dmitry; Bell, Randy; Brachet, Nicolas; Gaillard, Pierre; Kitov, Ivan; Rozhkov, Mikhail

    2014-05-01

    Waveform cross-correlation when applied to historical datasets of seismic records provides dramatic improvements in detection, location, and magnitude estimation of natural and manmade seismic events. With correlation techniques, the amplitude threshold of signal detection can be reduced globally by a factor of 2 to 3 relative to currently standard beamforming and STA/LTA detector. The gain in sensitivity corresponds to a body wave magnitude reduction by 0.3 to 0.4 units and doubles the number of events meeting high quality requirements (e.g. detected by three and more seismic stations of the International Monitoring System (IMS). This gain is crucial for seismic monitoring under the Comprehensive Nuclear-Test-Ban Treaty. The International Data Centre (IDC) dataset includes more than 450,000 seismic events, tens of millions of raw detections and continuous seismic data from the primary IMS stations since 2000. This high-quality dataset is a natural candidate for an extensive cross correlation study and the basis of further enhancements in monitoring capabilities. Without this historical dataset recorded by the permanent IMS Seismic Network any improvements would not be feasible. However, due to the mismatch between the volume of data and the performance of the standard Information Technology infrastructure, it becomes impossible to process all the data within tolerable elapsed time. To tackle this problem known as "BigData", the CEA/DASE is part of the French project "DataScale". One objective is to reanalyze 10 years of waveform data from the IMS network with the cross-correlation technique thanks to a dedicated High Performance Computer (HPC) infrastructure operated by the Centre de Calcul Recherche et Technologie (CCRT) at the CEA of Bruyères-le-Châtel. Within 2 years we are planning to enhance detection and phase association algorithms (also using machine learning and automatic classification) and process about 30 terabytes of data provided by the IDC to

  16. Factors affecting Safety Performance in Repair, Maintenance, Alteration, and Addition (RMAA Projects

    Directory of Open Access Journals (Sweden)

    Adnan Enshassi

    2014-11-01

    Full Text Available Repair, Maintenance, Alteration and Addition (RMAA works are playing an increasingly important role in developing countries. The accidents and fatalities records of RMAA sector in Gaza Strip have been alarmingly high; however, research in the RMAA sector remains limited. Safety of RMAA works has long been neglected because the project sizes of RMAA are small and only last for a short period of time, which make the working environment of RMAA works more difficult to control than new building works. The aim of this paper is to identify, valuate and rank the most important factors that affect safety performance and the most important causes of fatal accidents in RMAA projects. A questionnaire survey was used in this study. The results revealed that poor safety awareness of managers in maintenance firms and lack of training of RMAA workers for handling multi-tasks were the most important factors that affecting safety performance of RMAA works. The results showed that ineffectiveness of lack of training and certification of competence; immature corporate systems of firms which does not care with safety and health through RMAA works, and lack of leadership from government as a key client are the most significant causes of construction fatal accidents of RMAA projects. The results also indicated that the macro level factor is the most important category that causes fatal accidents in RMAA works. It is recommended to enhance the awareness of construction firms, project managers and workers regarding the importance of safety performance in repair and maintenance works and strengthen site monitoring and supervision system in construction firms. Safety training courses should be organized for workers and project managers in order to improve their safety culture and competence regarding safety performance through repair and maintenance works. Furthermore the RMAA subcontractors should be selected according to their good records of safety performance.

  17. Continuing pollution from the Rum Jungle U-Cu project: A critical evaluation of environmental monitoring and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Mudd, Gavin M., E-mail: Gavin.Mudd@eng.monash.edu.a [Environmental Engineering, Dept of Civil Engineering, Monash University, Clayton, VIC 3800 (Australia); Patterson, James [Environmental Engineering Consultant, Sydney, NSW (Australia)

    2010-05-15

    The former Rum Jungle uranium-copper project, Australia, is an internationally important case study on environmental pollution from and rehabilitation of mining. The Rum Jungle mining project is briefly reviewed, followed by a critical evaluation of monitoring data and pollution loads prior to and after rehabilitation - leading to the conclusion that rehabilitation has clearly failed the test of time after just two decades. The most critical findings are the need to understand pollution cycles holistically, and designing monitoring regimes to match, explicit inclusion of radiological criteria (lacking in original planning), and finally the need to set targets based on environmental criteria. Two examples include polluted groundwater which was excluded from rehabilitation and the poor design, construction and/or performance of engineered soil covers - both leading to increasing acid drainage impacts on the Finniss River. The critical review therefore presents a valuable case study of the environmental performance of uranium mine site rehabilitation. - The Rum Jungle U-Cu project underwent extensive rehabilitation in the 1980's, however, it remains a major cause of pollution to the Finniss River.

  18. Performance Monitoring Enterprise Applications with the BlackBird System

    Science.gov (United States)

    Germano, João P.; da Silva, Alberto Rodrigues; Silva, Fernando M.

    This work describes the BlackBird system, which is an analysis and monitoring service for data-intensive enterprise applications, without restrictions on the targeted architecture or employed technologies. A case study is presented for the monitoring of Billing applications from Vodafone Portugal. Monitoring systems are an essential tool for the effective management of Enterprise Applications and the attainment of the demanding service level agreements imposed to these applications. However, due to the increasing complexity and diversity of these applications, adequate monitoring systems are rarely available. The BlackBird monitoring system is able to interact with these applications through different technologies employed by the Monitored Application, and is able to produce Metrics regarding the application service level goals. The BlackBird system can be specified using a set of pre-defined Configuration Objects, allowing it to be extensible and adaptable for applications with different architectures.

  19. The ATLAS project: The effects of a constructionist digital laboratory project on undergraduate laboratory performance.

    Science.gov (United States)

    Shoepe, Todd C; Cavedon, Dana K; Derian, Joseph M; Levy, Celine S; Morales, Amy

    2015-01-01

    Anatomical education is a dynamic field where developments in the implementation of constructive, situated-learning show promise in improving student achievement. The purpose of this study was to examine the effectiveness of an individualized, technology heavy project in promoting student performance in a combined anatomy and physiology laboratory course. Mixed-methods research was used to compare two cohorts of anatomy laboratories separated by the adoption of a new laboratory atlas project, which were defined as preceding (PRE) and following the adoption of the Anatomical Teaching and Learning Assessment Study (ATLAS; POST). The ATLAS project required the creation of a student-generated, photographic atlas via acquisition of specimen images taken with tablet technology and digital microscope cameras throughout the semester. Images were transferred to laptops, digitally labeled and photo edited weekly, and compiled into a digital book using Internet publishing freeware for final project submission. An analysis of covariance confirmed that student final examination scores were improved (P atlas project (PRE, n = 75; POST, n = 90; means ± SE; 74.9 ± 0.9 versus 78.1 ± 0.8, respectively) after controlling for cumulative student grade point average. Analysis of questionnaires collected (n = 68) from the post group suggested students identified with atlas objectives, appreciated the comprehensive value in final examination preparation, and the constructionism involved, but recommended alterations in assignment logistics and the format of the final version. Constructionist, comprehensive term-projects utilizing student-preferred technologies could be used to improve performance toward student learning outcomes. © 2014 American Association of Anatomists.

  20. Hydrogen engine performance analysis project. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    Adt, Jr., R. R.; Swain, M. R.; Pappas, J. M.

    1980-01-01

    Progress in a 3 year research program to evaluate the performance and emission characteristics of hydrogen-fueled internal combustion engines is reported. Fifteen hydrogen engine configurations will be subjected to performance and emissions characterization tests. During the first two years, baseline data for throttled and unthrottled, carburetted and timed hydrogen induction, Pre IVC hydrogen-fueled engine configurations, with and without exhaust gas recirculation (EGR) and water injection, were obtained. These data, along with descriptions of the test engine and its components, the test apparatus, experimental techniques, experiments performed and the results obtained, are given. Analyses of other hydrogen-engine project data are also presented and compared with the results of the present effort. The unthrottled engine vis-a-vis the throttled engine is found, in general, to exhibit higher brake thermal efficiency. The unthrottled engine also yields lower NO/sub x/ emissions, which were found to be a strong function of fuel-air equivalence ratio. (LCL)

  1. Overview of vegetation monitoring data, 1952--1983. Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, J.P.

    1994-03-01

    This report is a result of the Hanford Environmental Dose Reconstruction (HEDR) Project. The goal of the HEDR Project is to estimate the radiation dose that individuals could have received from emissions since 1944 at the Hanford Site near Richland, Washington. Members of the HEDR Project`s Environmental Monitoring Data Task have developed databases of historical environmental measurements of such emissions. The HEDR Project is conducted by Battelle, Pacific Northwest Laboratories. This report is the third in a series that documents the information available on measurements of iodine-131 concentrations in vegetation. The first two reports provide the data for 1945--1951. This report provides an overview of the historical documents, which contain vegetation data for 1952--1983. The overview is organized according to the documents available for any given year. Each section, covering one year, contains a discussion of the media sampled, the sampling locations, significant events if there were any, emission quantities, constituents measured, and a list of the documents with complete reference information. Because the emissions which affected vegetation were significantly less after 1951, the vegetation monitoring data after that date have not been used in the HEDR Project. However, access to these data may be of interest to the public. This overview is, therefore, being published.

  2. Impact of an in-built monitoring system on family planning performance in rural Bangladesh

    Directory of Open Access Journals (Sweden)

    Ashraf Ali

    2007-06-01

    Full Text Available Abstract Background During 1982–1992, the Maternal and Child Health Family Planning (MCH-FP Extension Project (Rural of International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B, in partnership with the Ministry of Health and Family Welfare (MoHFW of the Government of Bangladesh (GoB, implemented a series of interventions in Sirajganj Sadar sub-district of Sirajganj district. These interventions were aimed at improving the planning mechanisms and for reviewing the problem-solving processes to build an effective monitoring system of the interventions at the local level of the overall system of the MOHFW, GoB. Methods The interventions included development and testing of innovative solutions in service-delivery, provision of door-step injectables, and strengthening of the management information system (MIS. The impact of an in-built monitoring system on the overall performance was assessed during the period from June 1995 to December 1996, after the withdrawal of the interventions in 1992. Results The results of the assessment showed that Family Welfare Assistants (FWAs increased household-visits within the last two months, and there was a higher use of service-delivery points even after the withdrawal of the interventions. The results of the cluster surveys, conducted in 1996, showed that the selected indicators of health and family-planning services were higher than those reported by the Bangladesh Demographic and Health Survey (BDHS 1996–1997. During June 1995-December, 1996, the contraceptive prevalence rate (CPR increased by 13 percentage points (i.e. from 40% to 53%. Compared to the national CPR (49%, this increase was statistically significant (p Conclusion The in-built monitoring systems, including effective MIS, accompanied by rapid assessments and review of performance by the programme managers, have potentials to improve family planning performance in low-performing areas.

  3. Genetic association studies of performance monitoring and learning from feedback: The role of dopamine and serotonin

    NARCIS (Netherlands)

    Ullsperger, M.

    2010-01-01

    Performance monitoring is essential for optimization of action outcomes. Research consistently implicates the posterior medial frontal cortex, particularly the rostral cingulate zone, in monitoring for unfavorable action outcomes, signaling the need for adjustments and learning from feedback.

  4. Experimental Adaptive Digital Performance Monitoring for Optical DP-QPSK Coherent Receiver

    DEFF Research Database (Denmark)

    Borkowski, Robert; Zhang, Xu; Zibar, Darko;

    2011-01-01

    We report on a successful experimental demonstration of a digital optical performance monitoring (OPM) yielding satisfactory estimation accuracy along with adaptive impairment equalization. No observable penalty is measured when equalizer is driven by monitoring module....

  5. Statistical process monitoring based on orthogonal multi-manifold projections and a novel variable contribution analysis.

    Science.gov (United States)

    Tong, Chudong; Shi, Xuhua; Lan, Ting

    2016-11-01

    Multivariate statistical methods have been widely applied to develop data-based process monitoring models. Recently, a multi-manifold projections (MMP) algorithm was proposed for modeling and monitoring chemical industrial processes, the MMP is an effective tool for preserving the global and local geometric structure of the original data space in the reduced feature subspace, but it does not provide orthogonal basis functions for data reconstruction. Recognition of this issue, an improved version of MMP algorithm named orthogonal MMP (OMMP) is formulated. Based on the OMMP model, a further processing step and a different monitoring index are proposed to model and monitor the variation in the residual subspace. Additionally, a novel variable contribution analysis is presented for fault diagnosis by integrating the nearest in-control neighbor calculation and reconstruction-based contribution analysis. The validity and superiority of the proposed fault detection and diagnosis strategy are then validated through case studies on the Tennessee Eastman benchmark process.

  6. Nearshore and offshore environmental effects monitoring at the Sable Offshore Energy project

    Energy Technology Data Exchange (ETDEWEB)

    Hurley, G. V. [Sable Offshore Energy Inc, Halifax, NS (Canada)

    2000-07-01

    A monitoring program to determine whether any temporary or permanent environmental perturbations may be attributable to the Sable offshore gas pipeline project as it approaches landfall at Goldboro through an outer bay is discussed, This nearshore region is an active fishing region for the residents of Goldboro, hence the concern about possible contamination. The monitoring project began with a baseline study, followed by monitoring the construction and the recovery period following construction, to ensure that any persistent changes to the nearshore aquatic environment were documented. The monitoring study included representatives of the fishing community to ensure that concerns are addressed early and on a continuing basis. At various phases of the project water properties,sediment modelling, the effects of construction on sea bottom conditions, benthic biota and cultivated mussels, water quality, phytoplankton, and resuspension of toxic cysts, terns and other seabirds were studied. Monitoring programs were also established for sea urchins and mussels, two important commercial species. Commercial-sized sea urchins showed a decrease of 60 per cent between 1998 and 1999 (i.e. the construction period). Recovery of sea urchin population in the immediate trench region will be the special focus of the post-construction monitoring phase. Mussel spat settlement and mussel tissue condition, lobster trapping, water properties, and bird behaviour showed no measurable changes during construction monitoring. In addition to these studies there is an ongoing offshore monitoring program in effect by Sable Offshore Energy Inc., put in place as a condition of approval of its Development Plan by the Canada-Nova Scotia Offshore Petroleum Board. This program monitors attributes such as water quality, suspended particulate matter in the benthic boundary layer, sediment quality, the benthic habitat and megafaunal community, shellfish body burden and taint, marine mammals and seabirds

  7. FINAL TECHNICAL REPORT: Underwater Active Acoustic Monitoring Network For Marine And Hydrokinetic Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Stein, Peter J. [Scientific Solutions, Inc, Nashua, NH (United States); Edson, Patrick L. [Scientific Solutions, Inc, Nashua, NH (United States)

    2013-12-20

    This project saw the completion of the design and development of a second generation, high frequency (90-120 kHz) Subsurface-Threat Detection Sonar Network (SDSN). The system was deployed, operated, and tested in Cobscook Bay, Maine near the site the Ocean Renewable Power Company TidGen™ power unit. This effort resulted in a very successful demonstration of the SDSN detection, tracking, localization, and classification capabilities in a high current, MHK environment as measured by results from the detection and tracking trials in Cobscook Bay. The new high frequency node, designed to operate outside the hearing range of a subset of marine mammals, was shown to detect and track objects of marine mammal-like target strength to ranges of approximately 500 meters. This performance range results in the SDSN system tracking objects for a significant duration - on the order of minutes - even in a tidal flow of 5-7 knots, potentially allowing time for MHK system or operator decision-making if marine mammals are present. Having demonstrated detection and tracking of synthetic targets with target strengths similar to some marine mammals, the primary hurdle to eventual automated monitoring is a dataset of actual marine mammal kinematic behavior and modifying the tracking algorithms and parameters which are currently tuned to human diver kinematics and classification.

  8. A multi-disciplinary approach for sea water quality monitoring: the IOSMOS project

    Science.gov (United States)

    Lacava, Teodosio; Ciancia, Emanuele; Coviello, Irina; Daraio, Maria; Paciello, Rossana; Pergola, Nicola; Pignatti, Stefano; Santini, Federico; Tramutoli, Valerio; Vallianatos, Filippos

    2013-04-01

    Coastal zones are complex and dynamic ecosystems which represent one of the most productive areas of the marine environment. They are an important economic resource for human populations: they provide food, energy as well as a lot of commerce and recreation activities. The strong anthropization, the irrational exploitation of resources and the climate changes are causing a strong modification of the coastal areas, representing a continuous threat to the biodiversity of these areas. This is why coastal zones deserve the developing and implementing of a monitoring system able to guarantee their consistent and reliable control as well as to timely identify any sign of degradation. Water quality is an important indicator of the health of coastal ecosystem. Remote sensing data can give relevant information in this framework, offering the capability to provide the spatial distribution of water constituents over large spatial areas with high temporal rates and relatively low costs. In particular Ocean Color (OC) satellite instruments furnish information both on sea surface optical variables (e.g. upwelling normalized water-leaving radiances) and on bio-optical parameters such as chlorophyll-a (as a proxy of phytoplankton), suspended materials and dissolved organic matter. A study of these parameters and of their evolution in the space-time domain may provide useful information on the overall quality of the sea water for a specific area, offering, in addition the reference behaviors necessary for identifying significant changes (possibly induced by anthropogenic pressure) in the coastal environment. In this context main aim of IOSMOS (IOnian Sea water quality MOnitoring by Satellite data) - a Project for European Transnational Cooperation co financed by the Operational Programme ERDF Basilicata 2007-2013 - is the development of advanced and exportable satellite products for measuring the above mentioned coastal water parameters as well as to timely identify short

  9. Monitoring the performance of an alternative cover using caisson lysimeters

    Energy Technology Data Exchange (ETDEWEB)

    Waugh, W.J.; Smith, G.M.; Mushovic, P.S.

    2004-02-29

    The U.S. Department of Energy (DOE) office in Grand Junction, Colorado, and the U.S. Environmental Protection Agency (EPA), Region 8, collaborated on a series of field lysimeter studies to design and monitor the performance of an alternative cover for a uranium mill tailings disposal cell at the Monticello, Utah, Superfund Site. Because groundwater recharge is naturally limited at Monticello in areas with thick loess soils, DOE and EPA chose to design a cover for Monticello using local soils and a native plant community to mimic this natural soilwater balance. Two large drainage lysimeters fabricated of corrugated steel culvert lined with high-density polyethylene were installed to evaluate the hydrological and ecological performance of an alternative cover design constructed in 2000 on the disposal cell. Unlike conventional, lowpermeability designs, this cover relies on (1) the water storage capacity of a 163-cm soil “sponge” layer overlying a sand-and-gravel capillary barrier to retain precipitation while plants are dormant and (2) native vegetation to remove precipitation during the growing season. The sponge layer consists of a clay loam subsoil compacted to 1.65 g/cm2 in one lysimeter and a loam topsoil compacted to 1.45 g/cm2 in the other lysimeter, representing the range of as-built conditions constructed in the nearby disposal cell cover. About 0.1 mm of drainage occurred in both lysimeters during an average precipitation year and before they were planted, an amount well below the EPA target of <3.0 mm/yr. However, the cover with less compacted loam topsoil sponge had a 40% greater water storage capacity than the cover with overly compacted clay loam subsoil sponge. The difference is attributable in part to higher green leaf area and water extraction by plants in the loam topsoil. The lesson learned is that seemingly subtle differences in soil types, sources, and compaction can result in salient differences in performance. Diverse, seeded communities of

  10. Annual report for RCRA groundwater monitoring projects at Hanford Site facilities for 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This report presents the annual hydrogeologic evaluation of 20 Resource Conservation and Recovery Act of 1976 groundwater monitoring projects and 1 nonhazardous waste facility at the US Department of Energy`s Hanford Site. Most of the projects no longer receive dangerous waste; a few projects continue to receive dangerous waste constituents for treatment, storage, or disposal. The 20 RCRA projects comprise 30 waste management units. Ten of the units are monitored under groundwater quality assessment status because of elevated levels of indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration, distribution, and rate of migration are evaluated. Groundwater is monitored at the other 20 units to detect contamination, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1992 and September 1993. Recent groundwater quality is also described for the 100, 200, 300, and 600 Areas and for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides.

  11. Transport infrastructure surveillance and monitoring by electromagnetic sensing: the ISTIMES project.

    Science.gov (United States)

    Proto, Monica; Bavusi, Massimo; Bernini, Romeo; Bigagli, Lorenzo; Bost, Marie; Bourquin, Frédrèric; Cottineau, Louis-Marie; Cuomo, Vincenzo; Della Vecchia, Pietro; Dolce, Mauro; Dumoulin, Jean; Eppelbaum, Lev; Fornaro, Gianfranco; Gustafsson, Mats; Hugenschmidt, Johannes; Kaspersen, Peter; Kim, Hyunwook; Lapenna, Vincenzo; Leggio, Mario; Loperte, Antonio; Mazzetti, Paolo; Moroni, Claudio; Nativi, Stefano; Nordebo, Sven; Pacini, Fabrizio; Palombo, Angelo; Pascucci, Simone; Perrone, Angela; Pignatti, Stefano; Ponzo, Felice Carlo; Rizzo, Enzo; Soldovieri, Francesco; Taillade, Fédrèric

    2010-01-01

    The ISTIMES project, funded by the European Commission in the frame of a joint Call "ICT and Security" of the Seventh Framework Programme, is presented and preliminary research results are discussed. The main objective of the ISTIMES project is to design, assess and promote an Information and Communication Technologies (ICT)-based system, exploiting distributed and local sensors, for non-destructive electromagnetic monitoring of critical transport infrastructures. The integration of electromagnetic technologies with new ICT information and telecommunications systems enables remotely controlled monitoring and surveillance and real time data imaging of the critical transport infrastructures. The project exploits different non-invasive imaging technologies based on electromagnetic sensing (optic fiber sensors, Synthetic Aperture Radar satellite platform based, hyperspectral spectroscopy, Infrared thermography, Ground Penetrating Radar-, low-frequency geophysical techniques, Ground based systems for displacement monitoring). In this paper, we show the preliminary results arising from the GPR and infrared thermographic measurements carried out on the Musmeci bridge in Potenza, located in a highly seismic area of the Apennine chain (Southern Italy) and representing one of the test beds of the project.

  12. Transport Infrastructure Surveillance and Monitoring by Electromagnetic Sensing: The ISTIMES Project

    Directory of Open Access Journals (Sweden)

    Marie Bost

    2010-11-01

    Full Text Available The ISTIMES project, funded by the European Commission in the frame of a joint Call “ICT and Security” of the Seventh Framework Programme, is presented and preliminary research results are discussed. The main objective of the ISTIMES project is to design, assess and promote an Information and Communication Technologies (ICT-based system, exploiting distributed and local sensors, for non-destructive electromagnetic monitoring of critical transport infrastructures. The integration of electromagnetic technologies with new ICT information and telecommunications systems enables remotely controlled monitoring and surveillance and real time data imaging of the critical transport infrastructures. The project exploits different non-invasive imaging technologies based on electromagnetic sensing (optic fiber sensors, Synthetic Aperture Radar satellite platform based, hyperspectral spectroscopy, Infrared thermography, Ground Penetrating Radar-, low-frequency geophysical techniques, Ground based systems for displacement monitoring. In this paper, we show the preliminary results arising from the GPR and infrared thermographic measurements carried out on the Musmeci bridge in Potenza, located in a highly seismic area of the Apennine chain (Southern Italy and representing one of the test beds of the project.

  13. Project monitoring and evaluation: an enhancing method for health research system management.

    Science.gov (United States)

    Djalalinia, Shirin; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Peykari, Niloofar

    2014-04-01

    Planning, organizing, staffing, leading and monitoring are the basic functional component of management. In present article, we aim to define the project monitoring and evaluation in health research system (HRS) considering its success and challenges based on our national experience. IN THIS STUDY BASED ON THE INFORMATION OF ANNUAL MEDICAL SCIENCE UNIVERSITIES EVALUATION DURING THE LAST DECADE THE HRS INDICATORS HAVE BEEN SCORED IN THREE AXES BASED ON HRS FUNCTIONS: Stewardship, capacity building and knowledge production. In this article, we will focus on the results of HRS evaluation from 2002 to 2010, also on its success and challenges. In an overall view, the main results are the experiences of the designing and implantation of such process after pre-project preparation, all parts followed under the whole supervision of the aims of the HRS evaluation. Project management light the way of practical application of knowledge, skills, tools and techniques for better HRS evaluation and management. We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  14. Applicability of the "Frame of Reference" approach for environmental monitoring of offshore renewable energy projects.

    Science.gov (United States)

    Garel, Erwan; Rey, Cibran Camba; Ferreira, Oscar; van Koningsveld, Mark

    2014-08-01

    This paper assesses the applicability of the Frame of Reference (FoR) approach for the environmental monitoring of large-scale offshore Marine Renewable Energy (MRE) projects. The focus is on projects harvesting energy from winds, waves and currents. Environmental concerns induced by MRE projects are reported based on a classification scheme identifying stressors, receptors, effects and impacts. Although the potential effects of stressors on most receptors are identified, there are large knowledge gaps regarding the corresponding (positive and negative) impacts. In that context, the development of offshore MRE requires the implementation of fit-for-purpose monitoring activities aimed at environmental protection and knowledge development. Taking European legislation as an example, it is suggested to adopt standardized monitoring protocols for the enhanced usage and utility of environmental indicators. Towards this objective, the use of the FoR approach is advocated since it provides guidance for the definition and use of coherent set of environmental state indicators. After a description of this framework, various examples of applications are provided considering a virtual MRE project located in European waters. Finally, some conclusions and recommendations are provided for the successful implementation of the FoR approach and for future studies.

  15. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19

    The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These

  16. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19

    The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These

  17. The International Remote Monitoring Project -- First results of the Argentina nuclear power station field trial

    Energy Technology Data Exchange (ETDEWEB)

    Bonino, A.; Pizarro, L.; Perez, A. [Ente Nacional Regulador Nuclear, Buenos Aires (Argentina); Schoeneman, J.L.; Dupree, S.A.; Martinez, R.L. [Sandia National Labs., Albuquerque, NM (United States); Maxey, C. [Oak Ridge National Lab., TN (United States)

    1995-12-31

    As part of the International Remote Monitoring Project field trials, during the month of March, 1995 a Remote Monitoring System (RMS) was installed at the Embalse Nuclear Power Station in Embalse, Argentina. This system monitors the status of four typical Candu spent fuel dry storage silos. The monitoring equipment for each silo consists of analog temperature and gamma radiation sensors and digital motion and electronic fiber-optic seals connected to a wireless Authenticate Item Monitoring System (AIMS). All sensor data are authenticated and transmitted via RF link to Receiver Processor Units (RPU) coupled to Remote Monitoring System equipment located in a nearby IAEA/ENREN inspector office. One of these RPUs is connected to Remote Monitoring equipment capable of information transmission (via commercial telephone links) to Data Review Stations (DRS) at ENREN laboratories in Buenos Aires, Argentina, and at Sandia National Laboratories, Albuquerque, New Mexico. The other RPU is used for on-site data storage and analysis. It is anticipated that this information will soon be transmitted to a DRS at the ABACC facility in Rio de Janeiro, Brazil. During these trials site data will be collected and analyzed periodically from Buenos Aires, Albuquerque, and Rio de Janeiro. Installation detail and data analysis will be presented in this paper.

  18. Sustainable Seas Student Monitoring Project at the Branson School in Ross, CA

    Science.gov (United States)

    Rainsford, A.; Soave, K.; Costolo, R.; Kudler, J.; Emunah, M.; Hatfield, J.; Kiyasu, J.

    2015-12-01

    Alina Rainsford, Kathy Soave, Julia Kudler, Jane Hatfield, Melea Emunah, Rose Costelo, Jenna Kiyasu, Amy Dean and Sustainable Seas Monitoring Project, Branson School, Ross, CA, United States, Farallones Marine Sanctuary Association, San Francisco, CA, United StatesAbstract:The Sustainable Seas Student Monitoring Project at the Branson School in Ross, CA has monitored Duxbury Reef in Bolinas, CA since 1999, in cooperation with the Farallones Marine Sanctuary Association and the Gulf of Farallones National Marine Sanctuary. Goals of this student-run project include: 1) To monitor the rocky intertidal habitat and develop a baseline database of invertebrates and algal density and abundance; 2) To contribute to the conservation of the rocky intertidal habitat through education of students and visitors about intertidal species; 3) To increase stewardship in the Gulf of the Farallones National Marine Sanctuary; and 4) To contribute abundance and population data on key algae and invertebrate species to the national database, LiMPETS (Long Term Monitoring Program & Experiential Training for Students). Each fall student volunteers complete an intensive training course on the natural history of intertidal invertebrates and algae, identification of key species, rocky intertidal monitoring techniques, and history of the sanctuary. Students identify and count key invertebrate and algae species along two permanent transects and, using randomly determined points, within two permanent 200 m2 areas, in fall, winter, and late spring. Using data from the previous years, we will compare population densities, seasonal abundance and long-term population trends of key algal and invertebrate species, including Tegula funebralis, Anthopluera elegantissima, Cladophora sp. and Fucus sp.. Future analyses and investigations will include intertidal abiotic factors (including water temperature, pH and human foot-traffic) to enhance insights into the Duxbury Reef ecosystem, in particular, the high

  19. The LIFE ProjectMonitoring of insects with public participation” (MIPP: aims, methods and conclusions

    Directory of Open Access Journals (Sweden)

    Giuseppe Maria Carpaneto

    2017-08-01

    Full Text Available The Life ProjectMonitoring of insects with public participation” (LIFE11 NAT/IT/000252 had as the main objective to develop and test methods for the monitoring of five beetle species listed in the Annexes of the Habitats Directive (92/43/EEC: Osmoderma eremita (hermit beetle, Scarabaeidae, Lucanus cervus (European stag beetle, Lucanidae, Cerambyx cerdo (great capricorn beetle, Cerambycidae, Rosalia alpina (rosalia longicorn, Cerambycidae and Morimus asper/funereus (morimus longicorn, Cerambycidae. The data gathered represent an important contribution to the monitoring of these target species in Italy. The methods developed for monitoring of the target species are intended for use by the local management authorities and staff of protected areas. These developed methods are the result of extensive fieldwork and ensure scientific validity, ease of execution and limited labour costs. The detailed description of methods and the results for each species are published in separate articles of this special issue of Nature Conservation. A second objective of the project was to gather faunistic data with a Citizen Science approach, using the web and a mobile application software (app specifically built for mobile devices. The validation of the records collected by the citizens was carried out by experts, based on photographs, which were obligatory for all records. Dissemination activities represented the principal way to contact and engage citizens for the data collection and also offered the possibility of providing information on topics such as Natura 2000, the Habitats Directive, the role of monitoring in nature conservation, the importance of forest ecosystems and the ecological role of the saproxylic insects. An innovative method tested during the project was the training of a dog for searching and monitoring the elusive hermit beetle; the trained dog also added a “curiosity” factor to attract public attention towards this rare insect and

  20. Field experience with a novel pipe protection and monitoring system for large offshore pipeline construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Magerstaedt, Michael; Blitz, Gunther [ROSEN Swiss AG, Stans (Switzerland); Sabido, Carlos E. [ROSEN Technology and Research Center, Lingen (Germany)

    2012-07-01

    For pipe joints stored during large-scale offshore pipeline construction projects, corrosion protection as well as protection from physical damage of pipelines is very important. Integrity Management does not just start with the operation of a pipeline. In the past, with the much lower risks and cost at stake in on shore constriction, this factor was often overlooked. Sometimes, newly laid pipelines failed upon hydrostatic testing or even during operation. Causes were corrosion or damage the pipe joints took before pipeline laying. For offshore projects, the cost and consequences associated with such failures are orders of magnitude higher and must be avoided by all means. Within six months from the conception of the idea, a system was developed and deployed that protected (and in part still protects) a large number of pipe joints used in a European offshore gas pipeline project more than 2000 km. The pipe joints were physically protected from corrosion, interior contamination, and condensation. At the same time, the system provided real-time monitoring of more than 100'000 pipe joints stored at 5 storage yards distributed over 3 countries with distances of more than 1200 km apart from each other. Every single joint was identified with its location and status at every time during the storage period. Any third-party interference was transmitted to a central control room in real time as well. Protection of the pipe joints was provided vs.: corrosion of pipe joint end cutbacks exposed to the maritime climate for up to 2 years; contamination of the pipe interior by: foreign material, dirt, water, ice, animals. Third party damage to the pipe joints; damage to the protection system or to the transmission network; fire; theft of pipe joints or other equipment. System features were: modular pipe caps that, protect the pipe interior, cover both inner and outer cutback, allow ventilation of the pipe interior, continuously monitor each pipe joint for third party damage

  1. A greenhouse gas monitoring and modelling system for Switzerland: The CarboCount CH project

    Science.gov (United States)

    Brunner, Dominik; Buchmann, Nina; Eugster, Werner; Seneviratne, Sonia; Davin, Edouard; Gruber, Nicolas; Leuenberger, Markus; Bey, Isabelle; Bamberger, Ines; Henne, Stephan; Liu, Yu; Mystakidis, Stefanos; Oney, Brian; Roches, Anne

    2014-05-01

    emission inventories. Atmosphere-biosphere exchange fluxes of CO2 are simulated with the coupled system COSMO-CLM2, i.e. COSMO coupled to the Community Land Model, a state-of-the-art land processes and biogeochemistry model. Here we present a general outline of the project, the setup of the measurement network and of the different modeling components and inverse methods. We have performed transport simulations for the first year of observations and calculated the contributions from anthropogenic and biogenic sources/sinks upstream of the measurement sites. The generally good agreement between simulated and measured concentrations underlines the high quality of the transport simulations, but occasional deviations are pointing towards weaknesses in both the emission inventories and in the simulated meteorology. The CarboCount CH project provides an ideal test bed for future carbon monitoring systems, to test the suitability of different types of monitoring stations, to analyze the challenges of a heterogeneous landscape, and to identify critical modelling components.

  2. The Transit Monitoring in the South (TraMoS project

    Directory of Open Access Journals (Sweden)

    López-Morales Mercedes

    2013-04-01

    Full Text Available We present the Transit Monitoring in the South (TraMoS project. TraMoS has monitored transits of 30 exoplanets with telescopes located in Chile since 2008, whit the following goals: (1 to refine the physical and/or orbital parameters of those exoplanet system, and (2 to search for variations in the mid-times of the transits and in other parameters such as orbital inclination or transit's depth, that could indicate the presence of additional bodies in the system. We highlight here the first results of TraMoS in three selected exoplanets.

  3. The Satellite based Monitoring Initiative for Regional Air quality (SAMIRA): Project summary and first results

    Science.gov (United States)

    Schneider, Philipp; Stebel, Kerstin; Ajtai, Nicolae; Diamandi, Andrei; Horalek, Jan; Nemuc, Anca; Stachlewska, Iwona; Zehner, Claus

    2017-04-01

    We present a summary and some first results of a new ESA-funded project entitled Satellite based Monitoring Initiative for Regional Air quality (SAMIRA), which aims at improving regional and local air quality monitoring through synergetic use of data from present and upcoming satellite instruments, traditionally used in situ air quality monitoring networks and output from chemical transport models. Through collaborative efforts in four countries, namely Romania, Poland, the Czech Republic and Norway, all with existing air quality problems, SAMIRA intends to support the involved institutions and associated users in their national monitoring and reporting mandates as well as to generate novel research in this area. The primary goal of SAMIRA is to demonstrate the usefulness of existing and future satellite products of air quality for improving monitoring and mapping of air pollution at the regional scale. A total of six core activities are being carried out in order to achieve this goal: Firstly, the project is developing and optimizing algorithms for the retrieval of hourly aerosol optical depth (AOD) maps from the Spinning Enhanced Visible and InfraRed Imager (SEVIRI) onboard of Meteosat Second Generation. As a second activity, SAMIRA aims to derive particulate matter (PM2.5) estimates from AOD data by developing robust algorithms for AOD-to-PM conversion with the support from model- and Lidar data. In a third activity, we evaluate the added value of satellite products of atmospheric composition for operational European-scale air quality mapping using geostatistics and auxiliary datasets. The additional benefit of satellite-based monitoring over existing monitoring techniques (in situ, models) is tested by combining these datasets using geostatistical methods and demonstrated for nitrogen dioxide (NO2), sulphur dioxide (SO2), and aerosol optical depth/particulate matter. As a fourth activity, the project is developing novel algorithms for downscaling coarse

  4. Optimizing the Time Performance of Subcontractors in Building Projects

    Directory of Open Access Journals (Sweden)

    Andy K.W Ng

    2010-07-01

    Full Text Available The main contractors of Hong Kong building projects tend to subcontract most of their work. However, many of the subcontractors complain that they are not being fully utilized due main contractors’ poor site coordination of temporary works and interfacing works and plant supports etc. A list of critical site coordination problems caused by main contractors that had adversely influence to the time performance of subcontractors was prepared. A questionnaire survey was conducted to collect data to generate multiple regression equations that explain how the critical site coordination problems affected the time performance of different types of subcontractor. The survey results were validated by neural network analysis. Backward elimination method was adopted to identify the ‘most critical’ site coordination problems that enable main contractors to formulate measures to enhance their site management system.

  5. Optimizing the Time Performance of Subcontractors in Building Projects

    Directory of Open Access Journals (Sweden)

    Andrew D.F Price

    2010-07-01

    Full Text Available  The main contractors of Hong Kong building projects tend to subcontract most of their work. However, many of the subcontractors complain that they are not being fully utilized due main contractors’ poor site coordination of temporary works and interfacing works and plant supports etc. A list of critical site coordination problems caused by main contractors that had adversely influence to the time performance of subcontractors was prepared. A questionnaire survey was conducted to collect data to generate multiple regression equations that explain how the critical site coordination problems affected the time performance of different types of subcontractor. The survey results were validated by neural network analysis. Backward elimination method was adopted to identify the ‘most critical’ site coordination problems that enable main contractors to formulate measures to enhance their site management system.

  6. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    Science.gov (United States)

    Widyolar, Bennett K.

    A solar thermal cooling system using novel non-tracking External Compound Parabolic Concentrators (XCPC) has been built at the University of California, Merced and operated for two cooling seasons. Its performance in providing power for space cooling has been analyzed. This solar cooling system is comprised of 53.3 m2 of XCPC trough collectors which are used to power a 23 kW double effect (LiBr) absorption chiller. This is the first system that combines both XCPC and absorption chilling technologies. Performance of the system was measured in both sunny and cloudy conditions, with both clean and dirty collectors. It was found that these collectors are well suited at providing thermal power to drive absorption cooling systems and that both the coinciding of available thermal power with cooling demand and the simplicity of the XCPC collectors compared to other solar thermal collectors makes them a highly attractive candidate for cooling projects.

  7. Economic Performance Analysis of National Research and Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. S.; Yun, S. W.; Kim, S. E. [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are a lot of differences between these two evaluation programs in terms of their main objectives, assessment items, and evaluation methods by item. When considering the recent evaluation trend of being more concerned with the objective and scientifically well-founded base of judgment than the qualitative results data, there seems to be much supplement and improvement points in both evaluation programs. Firstly, the MSIP's evaluation program which is known as 'The performance analysis of national R and D program in Korea is applying the principle of ex-post evaluation for the overall performances of R and D activities focusing on the scientific and technological outputs, economic effects, and social performances such as the training of science and engineering personnel. Its report has been done and published by the collaboration of MSIP and KISTEP(Korea Institute of Science and Technology Evaluation and Planning). There seems to be a trend that the economic contributions to the national economy and the industries by national R and D projects have been underestimated due to the difficulties of not presenting properly the reliable quantitative effects even though they have contributed not only to the real economy and economic growth but to the industrial productions and public benefits. The key reasons to this phenomenon might be the deficiency of perception for evaluation tools and methodologies development and the original difficulty of evaluation for R and D performances. Especially the evaluation results for national R and D projects could impact on the investment decision on the long-term national R and D program, with being based on the investment efficiency or the necessity and urgency which might be represented by evaluation results.

  8. Performance Projections For The Lithium Tokamak Experiment (LTX)

    Energy Technology Data Exchange (ETDEWEB)

    Majeski, R.; Berzak, L.; Gray, T.; Kaita, R.; Kozub, T.; Levinton, F.; Lundberg, D. P.; Manickam, J.; Pereverzev, G. V.; Snieckus, K.; Soukhanovskii, V.; Spaleta, J.; Stotler, D.; Strickler, T.; Timberlake, J.; Yoo, J.; Zakharov, L.

    2009-06-17

    Use of a large-area liquid lithium limiter in the CDX-U tokamak produced the largest relative increase (an enhancement factor of 5-10) in Ohmic tokamak confinement ever observed. The confinement results from CDX-U do not agree with existing scaling laws, and cannot easily be projected to the new lithium tokamak experiment (LTX). Numerical simulations of CDX-U low recycling discharges have now been performed with the ASTRA-ESC code with a special reference transport model suitable for a diffusion-based confinement regime, incorporating boundary conditions for nonrecycling walls, with fuelling via edge gas puffing. This model has been successful at reproducing the experimental values of the energy confinement (4-6 ms), loop voltage (<0.5 V), and density for a typical CDX-U lithium discharge. The same transport model has also been used to project the performance of the LTX, in Ohmic operation, or with modest neutral beam injection (NBI). NBI in LTX, with a low recycling wall of liquid lithium, is predicted to result in core electron and ion temperatures of 1-2 keV, and energy confinement times in excess of 50 ms. Finally, the unique design features of LTX are summarized.

  9. Project Monitor: Part II. Conservation in small business: an exploratory study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hammond, P Y

    1979-08-01

    Project Monitor examined the energy conservation attitude and behavior of small samples of small business owners/operators in Allegheny County, Pennsylvania, focusing on manufacturing concerns and retailers. Section I reports the findings on the energy conserving behavior of 92 smaller manufacturers and Section II identifies the factors which affect decision making concerning energy consuming activities by the owners/operators of 94 small retail establishments. In each, the impact of Project Pacesetter and of the coal strike and the general energy situation is considered. (MCW)

  10. The monitoring evaluation, reporting and verification of climate change mitigation projects

    Energy Technology Data Exchange (ETDEWEB)

    Vine, E.; Sathaye, J.

    1998-05-01

    Because of concerns with the growing threat of global climate change from increasing emissions of greenhouse gases, the US and other countries are implementing, by themselves or in cooperation with one or more other nations, climate change mitigation projects. These projects will reduce greenhouse gas (GHG) emissions or sequester carbon, and will also result in non-GHG benefits (i.e., environmental, economic, and social benefits). Monitoring, evaluating, reporting, and verifying (MERV) guidelines are needed for these projects to accurately determine their net GHG, and other, benefits. Implementation of MERV guidelines is also intended to: (1) increase the reliability of data for estimating GHG benefits; (2) provide real-time data so that mid-course corrections can be made; (3) introduce consistency and transparency across project types and reporters; and (4) enhance the credibility of the projects with stakeholders. In this paper, the authors review the issues involved in MERV activities. They identify several topics that future protocols and guidelines need to address, such as: (1) establishing a credible baseline; (2) accounting for impacts outside project boundaries through leakage; (3) net GHG reductions and other benefits; (4) precision of measurement; (5) MERV frequency; (6) persistence (sustainability) of savings, emissions reduction, and carbon sequestration; (7) reporting by multiple project participants; (8) verification of GHG reduction credits; (9) uncertainty and risk; (10) institutional capacity in conducting MERV; and (11) the cost of MERV.

  11. DELIVERING TIMELY AIR QUALITY, TRAFFIC, AND WEATHER INFORMATION TO YOUR COMMUNITY/THE PASO DEL NORTE ENVIRONMENTAL MONITORING PROJECT

    Science.gov (United States)

    EPA has developed a technology transfer handbook for the EMPACT Paso del Norte Project. The EMPACT Paso del Norte Environmental Monitoring Project is a mobile vehicle emissions project that involves the international community of El Paso, TX; Sundland Park, NM; and Juarez, Mexico...

  12. Tank monitor and control system (TMACS) performance analysis - under steady-state conditions

    Energy Technology Data Exchange (ETDEWEB)

    Bass, R.B., Westinghouse Hanford

    1996-07-30

    A means to predict the performance impacts to the TMACS computer system prior to further increases in the TMACS point configuration is studied. A series of CPU utilization measurements are made on the TMACS production and development computers. These measurements are under steady-state operating conditions for I/O point processing and remote terminal support.The data from these measurements are used to derive formulas that are then used to project CPU utilization for other configuration profiles. A configuration profile is described for (1) the current TMACS production system, (2) the maximum capacity of the current TMACS production system, and (3) a much larger target system, which reflects the anticipated size of the monitoring system for the upgrade project, W-314. The derived formulas are used to calculate CPU utilization for each of these configuration profiles. The formulas are validated by comparing the calculated with the measured results for the current production configuration. An analysis is performed that shows that the current system of 1.600 points can be expanded to 4,000 points without any changes. Furthermore, the current system can be expanded to 10,000 points to meet the requirements of the target system with the planned purchase of new-generation hardware and modifications to the logging and delta-check routines.

  13. The Hybrid Management Model: Influences of Organizational Structure and IT Project Management Practices on the Performance of Federal IT Projects

    Science.gov (United States)

    Neves, Celine A.

    2012-01-01

    The federal government spends much money on information technology (IT) projects each year, yet numerous IT projects continue to underperform. For instance, in Fiscal Year 2008, OMB and federal agencies identified approximately 413 IT projects ($25.2 billion) as being poorly planned, poorly performing, or both. Agencies struggle to implement sound…

  14. The Hybrid Management Model: Influences of Organizational Structure and IT Project Management Practices on the Performance of Federal IT Projects

    Science.gov (United States)

    Neves, Celine A.

    2012-01-01

    The federal government spends much money on information technology (IT) projects each year, yet numerous IT projects continue to underperform. For instance, in Fiscal Year 2008, OMB and federal agencies identified approximately 413 IT projects ($25.2 billion) as being poorly planned, poorly performing, or both. Agencies struggle to implement sound…

  15. Evaluation of failure or deficient performance factors of approved research projects by TUMS research council

    Directory of Open Access Journals (Sweden)

    Zarinara A.

    2002-08-01

    Full Text Available The major activity for vice chancellor for research at Tehran University of Medical Sciences (TUMS is to monitor research projects undertaken by the academic staff. Sometimes projects have been failed in meeting their objectives. The aim of this project was the evaluation of the failure of the research projects at TUMS from the establishment date to 1379. A case-control survey was designed and 70 failed projects with 71 successfully completed projects were considered and compared. Results showed that type of study, location of administration, methodology, qualification of executive and duration of project were the factors of failure of the projects. Number of executives, experienced in research projects and executive position were not the effective factors. The most important reason for failure was unsustainably of executive. So, university research council (URC should pay attention on forecast of time and budget of projects and realization of mentioned matters, besides of attention to methodology of project.

  16. Using Six Sigma to improve once daily gentamicin dosing and therapeutic drug monitoring performance.

    LENUS (Irish Health Repository)

    Egan, Sean

    2012-08-07

    BACKGROUND: Safe, effective therapy with the antimicrobial gentamicin requires good practice in dose selection and monitoring of serum levels. Suboptimal therapy occurs with breakdown in the process of drug dosing, serum blood sampling, laboratory processing and level interpretation. Unintentional underdosing may result. This improvement effort aimed to optimise this process in an academic teaching hospital using Six Sigma process improvement methodology. METHODS: A multidisciplinary project team was formed. Process measures considered critical to quality were defined, and baseline practice was examined through process mapping and audit. Root cause analysis informed improvement measures. These included a new dosing and monitoring schedule, and standardised assay sampling and drug administration timing which maximised local capabilities. Three iterations of the improvement cycle were conducted over a 24-month period. RESULTS: The attainment of serum level sampling in the required time window improved by 85% (p≤0.0001). A 66% improvement in accuracy of dosing was observed (p≤0.0001). Unnecessary dose omission while awaiting level results and inadvertent disruption to therapy due to dosing and monitoring process breakdown were eliminated. Average daily dose administered increased from 3.39 mg\\/kg to 4.78 mg\\/kg\\/day. CONCLUSIONS: Using Six Sigma methodology enhanced gentamicin usage process performance. Local process related factors may adversely affect adherence to practice guidelines for gentamicin, a drug which is complex to use. It is vital to adapt dosing guidance and monitoring requirements so that they are capable of being implemented in the clinical environment as a matter of routine. Improvement may be achieved through a structured localised approach with multidisciplinary stakeholder involvement.

  17. THE FEATURES OF AIRCRAFT FUNCTIONAL SYSTEMS PERFORMANCE MONITORING

    Directory of Open Access Journals (Sweden)

    Stanislav Alexandrovich Krotov

    2017-01-01

    Full Text Available The key steps of aircraft essential parameters and events monitoring during its operation are considered in the arti- cle. Conditions for specific risk monitoring are also presented.The notion of fail-safe feature of aircraft functional systems is analysed, and the necessity of continuous process of safety flight level estimate is shown. The method of quantitative assessment of key events and risks probabilities with the use of modern software is proposed. This method contains 5 basic stages: The monitoring parameters setting - this stage is initial and begins with the consideration of organization safety cul- ture, the main purposes and problems determination, the basic parameters and characteristics forming which are to be monitored. The event monitoring in operation - on this stage continuous process of key events searching and monitoring which are a thing of importance within the framework of the established problems takes place. This process is closely relat- ed to parameters monitoring set on the first stage. The event and risk estimate - this stage begins directly after the event has been discovered. The estimate pro- cess is as long as it is required to identify the event gravity. It also contains the preliminary risk estimate for using in priori- tization of initial expanded estimate and in the working out of plan for activities realization. The working out of plan for activities - on this stage correction data is determined that will make changes to aero- technics working out, operation, maintenance and to staff training directly in linkage to the problem event identified earlier. The activity carrying-out - the realization of actions according to the activity plan. This stage concludes priori- tization, planning and problem carrying-out. The dependence set between the probability of failure situations and the degree of their danger is shown. The key factors which are subject to be estimated while aircraft operating and which aim with

  18. Decomposition of Near-Infrared Spectroscopy Signals Using Oblique Subspace Projections: Applications in Brain Hemodynamic Monitoring

    Science.gov (United States)

    Caicedo, Alexander; Varon, Carolina; Hunyadi, Borbala; Papademetriou, Maria; Tachtsidis, Ilias; Van Huffel, Sabine

    2016-01-01

    Clinical data is comprised by a large number of synchronously collected biomedical signals that are measured at different locations. Deciphering the interrelationships of these signals can yield important information about their dependence providing some useful clinical diagnostic data. For instance, by computing the coupling between Near-Infrared Spectroscopy signals (NIRS) and systemic variables the status of the hemodynamic regulation mechanisms can be assessed. In this paper we introduce an algorithm for the decomposition of NIRS signals into additive components. The algorithm, SIgnal DEcomposition base on Obliques Subspace Projections (SIDE-ObSP), assumes that the measured NIRS signal is a linear combination of the systemic measurements, following the linear regression model y = Ax + ϵ. SIDE-ObSP decomposes the output such that, each component in the decomposition represents the sole linear influence of one corresponding regressor variable. This decomposition scheme aims at providing a better understanding of the relation between NIRS and systemic variables, and to provide a framework for the clinical interpretation of regression algorithms, thereby, facilitating their introduction into clinical practice. SIDE-ObSP combines oblique subspace projections (ObSP) with the structure of a mean average system in order to define adequate signal subspaces. To guarantee smoothness in the estimated regression parameters, as observed in normal physiological processes, we impose a Tikhonov regularization using a matrix differential operator. We evaluate the performance of SIDE-ObSP by using a synthetic dataset, and present two case studies in the field of cerebral hemodynamics monitoring using NIRS. In addition, we compare the performance of this method with other system identification techniques. In the first case study data from 20 neonates during the first 3 days of life was used, here SIDE-ObSP decoupled the influence of changes in arterial oxygen saturation from the

  19. A multi-year monitoring project of the high-altitude Cenote ice cave, Dolomites, Italy

    Science.gov (United States)

    Sauro, Francesco; Santagata, Tommaso; Spötl, Christoph; Festi, Daniela; Oeggl, Klaus; Dal Molin, Luca; De Waele, Jo

    2016-04-01

    The Cenote ice cave hosts one of the most voluminous cave glaciers of the Dolomites. This 280 m-deep abyss was discovered in 1994 after the entrance had opened as a result of the abrupt emptying of a small lake at 2940 m a.s.l. in the Regional Park of Fanes, Sennes and Braies. The cave consists of a massive, 130 m-thick layered ice deposit carved by meltwater tunnels and chimneys excavated from below by ascending air. At the lower limit of the cave glacier a shaft opens - ice-free and 165 m deep - leading into a dome occupied by a cave rock glacier with typical terminal tongue embankments. A research project was launched to monitor long-term movements and volume changes of this ice deposit as well as to understand the cave microclimate and the potential for future palaeoclimate studies. During October 2015 a first expedition performed a complete survey of the final chamber using a Leica HDS7000, a phase difference laser scanner equipped with a dual axis compensator, on-board control, a wavelenght of 1.5 microns, a laser "CLASS 1" with a flow rate of 187 m and a resolution of 0.1 mm. A scan station was performed also at 110 m above the bottom of the shaft to map in detail the lower side of the hanging ice glacier. This survey has provided the detailed volume of the chamber (420,000 m3) as well as a first record of the position of the ice masses hanging on the ceiling and of the rock glacier at the bottom. Barometric, temperature and humidity dataloggers have been installed in the cave to record the microclimate. In addition pollen traps have been installed to study the present flux of pollen at the surface and inside the cave, while preliminary analyses on pollen grains preserved in the ice are being carried out. The Cenote ice cave research project aims to shed light on the climate evolution of the Dolomites during the last hundreds or possibly thousands of years, as well as on the more recent environmental changes that lead to the upward melting of the cave

  20. Detection of gaps in the spatial coverage of coral reef monitoring projects in the US Caribbean and Gulf of Mexico.

    Science.gov (United States)

    Asch, R G; Turgeon, D D

    2003-06-01

    As part of the US Coral Reef Task Force's National Program to Map, Assess, Inventory, and Monitor US Coral Reef Ecosystems, a comprehensive survey of projects/programs monitoring coral reef ecosystems and related habitats (i.e., seagrass beds and mangroves) in the US Caribbean and Pacific was undertaken. Information was gathered on a total of 296 monitoring and assessment projects conducted since 1990 in the US Caribbean and the Gulf of Mexico. Substantial gaps in monitoring coverage of US coral reef ecosystems were revealed through geographic information system (GIS) analysis of survey metadata. Although southern Florida contains approximately two-thirds of all marine monitoring projects found in the US Caribbean and Gulf of Mexico, we were unable to identify any ongoing projects that monitor coral reefs along Florida's western coast and off of the Florida Middle Grounds. Additionally, Florida is covered by approximately 1 900 km2 of mangroves, yet there were only four ongoing projects that monitor this ecosystem, leaving gaps in coverage in the Lower and Middle Keys and along the eastern and western coasts. The Flower Garden Banks National Marine Sanctuary, located offshore of the Texas/Louisiana border, has an integral long-term monitoring program, but lacks a monitoring project that gathers long-term, quantitative data on reef lish abundance and certain water quality parameters. Numerous coral reef monitoring projects in Puerto Rico are concentrated on the island's southwestern coast surrounding La Parguera, while far fewer monitoring projects are conducted along the northern and southeastern coasts and around Vieques Island. In the US Virgin Islands, the paucity of monitoring projects in large areas of St. Croix and St. Thomas contrasts with monitoring activity in three marine protected areas (MPAs), where 66% of the US Virgin Islands' coral reef monitoring sites were found. Only a series of assessments have been conducted at Navassa, a small, uninhabited

  1. Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C.

    2005-09-01

    This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

  2. Automated chemical monitoring in new projects of nuclear power plant units

    Science.gov (United States)

    Lobanok, O. I.; Fedoseev, M. V.

    2013-07-01

    The development of automated chemical monitoring systems in nuclear power plant units for the past 30 years is briefly described. The modern level of facilities used to support the operation of automated chemical monitoring systems in Russia and abroad is shown. Hardware solutions suggested by the All-Russia Institute for Nuclear Power Plant Operation (which is the General Designer of automated process control systems for power units used in the AES-2006 and VVER-TOI Projects) are presented, including the structure of additional equipment for monitoring water chemistry (taking the Novovoronezh 2 nuclear power plant as an example). It is shown that the solutions proposed with respect to receiving and processing of input measurement signals and subsequent construction of standard control loops are unified in nature. Simultaneous receipt of information from different sources for ensuring that water chemistry is monitored in sufficient scope and with required promptness is one of the problems that have been solved successfully. It is pointed out that improved quality of automated chemical monitoring can be supported by organizing full engineering follow-up of the automated chemical monitoring system's equipment throughout its entire service life.

  3. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States). Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  4. Summary of operations and performance of the Murdock site restoration project in June 2005-December 2006.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-05-31

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the initial period of systems operation, from June 2005 through December 2006. In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the initial period of operation.

  5. 2008 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-03-01

    This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof of concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the site during 2008. This is the second groundwater monitoring report prepared by LM for the PSA

  6. The Project Monitoring and Early Warning System of Mould and Die

    Institute of Scientific and Technical Information of China (English)

    WANG Zongzhong; WANG Yi; CHEN Qingxin; MAO Ning

    2006-01-01

    The article simply describes the difficulties of the Mould and Die project control, and then put forward the thoughts of developing the Monitoring and Early Warning System for the Mould and Die manufacturing. Afterwards, the main three constructing principles and the goals of the system are explained carefully. Based on those, the theory and the classifications of the Monitoring and Early Warning are expounded. With the assistance of the use case diagram of UML (the United Modeling Language), the main functions of the system are analyzed; and with the activity diagram of the UML, the work flows of the monitoring and early warning are expressed clearly. Finally, the classes and the architectures of the system are designed by making use of the class diagram of UML.

  7. 2010 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-02-01

    This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended March 2010) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes the results from the groundwater monitoring program during fiscal year 2010.

  8. Assessing the monitoring performance using a synthetic microseismic catalogue for hydraulic fracturing

    Science.gov (United States)

    Ángel López Comino, José; Kriegerowski, Marius; Cesca, Simone; Dahm, Torsten; Mirek, Janusz; Lasocki, Stanislaw

    2016-04-01

    Hydraulic fracturing is considered among the human operations which could induce or trigger seismicity or microseismic activity. The influence of hydraulic fracturing operations is typically expected in terms of weak magnitude events. However, the sensitivity of the rock mass to trigger seismicity varies significantly for different sites and cannot be easily predicted prior to operations. In order to assess the sensitivity of microseismity to hydraulic fracturing operations, we perform a seismic monitoring at a shale gas exploration/exploitation site in the central-western part of the Peribaltic synclise at Pomerania (Poland). The monitoring will be continued before, during and after the termination of hydraulic fracturing operations. The fracking operations are planned in April 2016 at a depth 4000 m. A specific network setup has been installed since summer 2015, including a distributed network of broadband stations and three small-scale arrays. The network covers a region of 60 km2. The aperture of small scale arrays is between 450 and 950 m. So far no fracturing operations have been performed, but seismic data can already be used to assess the seismic noise and background microseismicity, and to investigate and assess the detection performance of our monitoring setup. Here we adopt a recently developed tool to generate a synthetic catalogue and waveform dataset, which realistically account for the expected microseismicity. Synthetic waveforms are generated for a local crustal model, considering a realistic distribution of hypocenters, magnitudes, moment tensors, and source durations. Noise free synthetic seismograms are superposed to real noise traces, to reproduce true monitoring conditions at the different station locations. We estimate the detection probability for different magnitudes, source-receiver distances, and noise conditions. This information is used to estimate the magnitude of completeness at the depth of the hydraulic fracturing horizontal wells

  9. 99Tc Process Monitoring System In-Lab Performance Characterization

    Energy Technology Data Exchange (ETDEWEB)

    O' Hara, Matthew J.; Niver, Cynthia M.

    2014-01-01

    Executive Summary A 99Tc Process Monitoring (Tc-Mon) System has been designed and built for deployment at the recently constructed 200 West Pump & Treat (200W P&T) Plant in the 200 West Area ZP-1 Operable Unit of the Hanford Site. The plant is operated by CH2M Hill Plateau Remediation Company (CHPRC). The Tc-Mon system was created through collaboration between Pacific Northwest National Laboratory (PNNL) and Burge Environmental, Inc. The new system’s design has been optimized based on experience from an earlier field test (2011) of a prototype system at the 200W-ZP-1 Interim Pump & Treat Plant. A portion of the new 200W P&T Plant is dedicated to removal of 99Tc from contaminated groundwater in the 200 West Area. 99Tc, as the pertechnetate anion (99TcO4-), is remediated through delivery of water into two trains (Trains A and B) of three tandem extraction columns filled with Purolite A530E resin. The resin columns cannot be regenerated; therefore, once they have reached their maximum useful capacity, the columns must be disposed of as radioactive waste. The Tc-Mon system’s primary duty will be to periodically sample and analyze the effluents from each of the two primary extraction columns to determine 99Tc breakthrough. The Tc-Mon system will enable the CH2M Hill Plateau Remediation Company (CHPRC) to measure primary extraction column breakthrough on demand. In this manner, CHPRC will be able to utilize each extraction column to its maximum capacity. This will significantly reduce column disposal and replacement costs over the life of the plant. The Tc-Mon system was constructed by Burge Environmental, Inc. and was delivered to PNNL in June 2013 for setup and initial hardware and software performance testing in the 325 Building. By early July, PNNL had initiated an in-laboratory performance characterization study on the system. The objective was to fully calibrate the system and then evaluate the quality of the analytical outputs 1) against a series of clean

  10. Monitoring and Evaluation : Yakima/Klickitat Fisheries Project, Final Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, Melvin R.

    2000-01-01

    The monitoring and evaluation objectives and tasks have been developed through a joint process between the co-managers, Yakama Nation (YN, Lead Agency) and Washington Department of Fish and Wildlife (WDFW). The Science/Technical Advisory Committee (STAC), which consists of core members from the co-managers, employs the services of a work committee of scientists, the Monitoring Implementation Planning Team (MIPT) to develop the Monitoring and Evaluation (M&E) Plan. The process employed by STAC to verify these designated activities and the timing of their implementation involved the utilization of the following principles: (1) YKFP monitoring should evaluate the success (or lack of it) of project supplementation efforts and its impacts, including juvenile post release survival, natural production and reproductive success, ecological interactions, and genetics; (2) YKFP monitoring should be comprehensive: and, (3) YKFP monitoring should be done in such a way that results are of use to salmon production efforts throughout and Columbia basin and the region. Utilizing these principles, STAC and MIPT developed this M&E action plan in three phases. The first phase was primarily conceptual. STAC and MIPT defined critical issues and problems and identified associated response variables. The second phase was quantitative, which determined the scale and size of an effective monitoring effort. A critical element of the quantitative phase was an assessment of the precision with which response variables can be measured, the probability of detecting real impacts and the sample sizes required for a given level of statistical precision and power. The third phase is logistical. The feasibility of monitoring measures was evaluated as to practicality and cost. The Policy Group has determined that the M&E activities covered by this agreement are necessary, effective and cost-efficient.

  11. Monitoring and Evaluation : Yakima/Klickitat Fisheries Project, Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, Melvin R.

    2002-12-01

    The monitoring and evaluation objectives and tasks have been developed through a joint process between the co-managers, Yakama Nation (YN, Lead Agency) and Washington Department of Fish and Wildlife (WDFW). The Science/Technical Advisory Committee (STAC), which consists of core members from the co-managers, employs the services of a work committee of scientists, the Monitoring Implementation Planning Team (MIPT) to develop the Monitoring and Evaluation (M&E) Plan. The process employed by STAC to verify these designated activities and the timing of their implementation involved the utilization of the following principles: (1) YKFP monitoring should evaluate the success (or lack of it) of project supplementation efforts and its impacts, including juvenile post release survival, natural production and reproductive success, ecological interactions, and genetics; (2) YKFP monitoring should be comprehensive: and, (3) YKFP monitoring should be done in such a way that results are of use to salmon production efforts throughout and Columbia basin and the region. Utilizing these principles, STAC and MIPT developed this M&E action plan in three phases. The first phase was primarily conceptual. STAC and MIPT defined critical issues and problems and identified associated response variables. The second phase was quantitative, which determined the scale and size of an effective monitoring effort. A critical element of the quantitative phase was an assessment of the precision with which response variables can be measured, the probability of detecting real impacts and the sample sizes required for a given level of statistical precision and power. The third phase is logistical. The feasibility of monitoring measures was evaluated as to practicality and cost. The Policy Group has determined that the M&E activities covered by this agreement are necessary, effective and cost-efficient.

  12. Performance monitoring in autism spectrum disorders: A systematic literature review of event-related potential studies.

    Science.gov (United States)

    Hüpen, Philippa; Groen, Yvonne; Gaastra, Geraldina F; Tucha, Lara; Tucha, Oliver

    2016-04-01

    Autism spectrum disorder (ASD) is marked by impairments in social-emotional situations, executive functioning, and behavioral regulation. These symptoms may be related to deficits in performance monitoring, i.e., the ability to observe and evaluate one's own behavior and performance which is necessary for the regulation of future behavior. The present literature review investigated electroencephalic correlates of performance monitoring in ASD. Event-related potentials (ERPs) considered in this review included internal performance monitoring components (error-related negativity, error positivity), external performance monitoring components (feedback-related negativity, feedback-P3), and observational performance monitoring components (observer error-related negativity, observer feedback-related negativity). The majority of studies point to reduced internal performance monitoring in ASD. External performance monitoring in reward-processing paradigms, where rewards are independent of performance, seems to be intact in ASD. So far, no studies have investigated the observer error-related negativity in ASD. Available data on the observer feedback-related negativity are inconclusive, since only two studies with differential study results investigated this construct in ASD. In general, results suggest that individuals with ASD have problems with internal performance monitoring and with learning from external, abstract feedback. In contrast, the processing of external, concrete feedback seems to be largely intact in ASD.

  13. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Data Report

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barber, David S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Betsill, J. David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Littlefield, Adriane C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Mohagheghi, Amir H. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Shanks, Sonoya T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Yuldashev, Bekhzad [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Saalikhbaev, Umar [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Radyuk, Raisa [Inst. of Nuclear Physics, Tashkent (Uzbekistan); Djuraev, Akram [Tajik Academy of Sciences, Dushanbe (Tajikistan); Djuraev, Anwar [Tajik Academy of Sciences, Dushanbe (Tajikistan); Vasilev, Ivan [Inst. of Physics, Bishkek (Kyrgyzstan); Tolongutov, Bajgabyl [Inst. of Physics, Bishkek (Kyrgyzstan); Valentina, Alekhina [Inst. of Physics, Bishkek (Kyrgyzstan); Solodukhin, Vladimir [Inst. of Nuclear Physics, Almaty (Kazakhstan); Pozniak, Victor [Inst. of Nuclear Physics, Almaty (Kazakhstan)

    2003-04-01

    The Navruz Project is a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan, and facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. The Project also collects data on basic water quality parameters. Data obtained in this project are shared among all participating countries and the public through a world-wide web site (http://www.cmc.sandia.org/Central/centralasia.html), and are available for use in further studies and in regional transboundary water resource management efforts. This report includes graphs showing selected data from the Fall 2000 and Spring 2001 sampling seasons. These data include all parameters grouped into six regions, including main rivers and some tributaries in the Amu Darya and Syr Darya river systems. This report also assembles all data (in tabular form) generated by the project from Fall 2000 through Fall 2001. This report comes as the second part of a planned three-part reporting process. The first report is the Sampling and Analysis Plan and Operational Manual, SAND 2002-0484. This is the second report.

  14. Results of the MITRA project: Monitoring and intervention for the transportation of dangerous goods

    Energy Technology Data Exchange (ETDEWEB)

    Planas, E. [Centre d' Estudis del Risc Tecnologic (CERTEC), Departament d' Enginyeria Quimica, Universitat Politecnica de Catalunya, Diagonal 647, 08028-Barcelona, Catalonia (Spain)], E-mail: eulalia.planas@upc.edu; Pastor, E. [Centre d' Estudis del Risc Tecnologic (CERTEC), Departament d' Enginyeria Quimica, Universitat Politecnica de Catalunya, Diagonal 647, 08028-Barcelona, Catalonia (Spain); Presutto, F. [M3 Systems, 1 Rue des Oiseaux, 31410 Lavernose (France); Tixier, J. [Ecole des Mines d' Ales, Ales (France)

    2008-04-01

    The objective of the MITRA (monitoring and intervention for the transportation of dangerous goods) project was to prototype a new operational system for monitoring the transportation of dangerous goods in Europe based on regional responsibilities. This concept, based on systems used in air traffic control, aims to provide civil security centres with real-time knowledge of the position and contents of dangerous vehicles circulating in their area of responsibility, and, in the event of a dangerous situation, to issue warnings, alerts and crisis management information, thereby allowing intervention teams to react immediately with maximum safety. The project was funded by the European Commission under the 6th Framework Programme (STREP - specific targeted research project - under the Information Society Technologies priority). It started on 1 September 2004 and ended on 31 October 2006. This paper presents the results of this project and the conclusions derived from the field tests carried out in Germany and in the French/Spanish border region in order to test the proposed operational system.

  15. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs.

  16. The CHAIN-Project and Installation of Flare Monitoring Telescopes in Developing Countries

    Directory of Open Access Journals (Sweden)

    S UeNo

    2009-04-01

    Full Text Available The Flare Monitoring Telescope (FMT was constructed in 1992 at Hida Observatory in Japan to investigate the long-term variation of solar activity and explosive events. It has five solar imaging telescopes that simultaneously observe the full-disk Sun at different wavelengths around the H-alpha absorption line or in different modes. Therefore, the FMT can measure the three-dimensional velocity field of moving structures on the full solar disk. The science target of the FMT is to monitor solar flares and erupting filaments continuously all over the solar disk and to investigate correlation between the characteristics of the erupting phenomena and the geoeffectiveness of the corresponding coronal mass ejections (CMEs. We are planning to start up a new worldwide project, the Continuous H-alpha Imaging Network (CHAIN project, as an important IHY project of our observatories. As part of this project, we are examining the possibility of installing telescopes similar to the FMT in developing countries. We have selected Peru and Algeria as the countries where the first and second overseas FMTs will be installed, and we are aiming to start operation of these FMTs by the end of 2010 before the maximum phase of solar cycle 24. To create such an international network, it will be necessary to improve the information technologies applied in our observation-system. In this paper, we explain the current status and future areas of work regarding our system.

  17. Web based concept project for information and communication of monitoring policy and techniques

    Energy Technology Data Exchange (ETDEWEB)

    Levy, D. S.; Sordi, G. M. A. A., E-mail: info@uniprorad.com.br [Instituto de Pesquisas Energeticas e Nucleares / CNEN, Av. Lineu Prestes 2242, Cidade Universitaria, 05508-000 Sao Paulo (Brazil)

    2014-08-15

    Information and Communication Technology (ICT) is growing in Brazil and worldwide. The servers processing power added to the technology of relational databases allow to integrate information from different sources, enabling complex queries with reduced response time. We believe that the use of information technology for the radiological protection programs for human activities shall help greatly the radioactive facility that requires such use. Therefore, this project aims the informatization of the monitoring policy and techniques in Portuguese, providing Brazilian radioactive facilities a complete repository for research, consultation and information in a quick, integrated and efficient way. In order to meet national and international standards, the development of this project includes concepts, definitions and theory about monitoring procedures in order to interrelate information, currently scattered in several publications and documents, in a consistent and appropriate manner. The Web platform tools and functionalities were developed according to our target public needs, regarding new possibilities of media, like mobile access, feeds of content and information sharing. Moreover, taking into account this is a pioneer project with the prospect of long-term use, our challenge involves the combination of multiple computer technologies that allows a robust, effective, and flexible system, which can be easily adapted according to future technological innovations. This pioneer project shell help greatly both radioactive facilities and researchers, and it is our target to make it an international reference for Portuguese Spoken countries. (Author)

  18. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    Science.gov (United States)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and

  19. Biomedical performance monitoring and assessment of astronauts by means of an ocular vestibular monitoring system

    Science.gov (United States)

    Souvestre, Philippe A.; Landrock, Clinton

    2007-02-01

    The paper focuses on the strong correlation between unmitigated symptoms exhibited by post Space flight astronauts, and symptoms associated with postural deficiency syndrome (PDS) that can be correctly assessed, identified, and monitored via a neurophysiological ocular-vestibular monitoring system (OVMS). From examining clinical data taken over a 10-year period from patients experiencing PDS related acute and chronic post-traumatic medical conditions, the authors show the potential for current assessment and monitoring techniques to examine better the impacts on astronaut neurophysiology. The data presented provide strong evidence that this biomedical monitoring and assessment methodology along with appropriate technology can lead to a better understanding of astronaut post-flight neurophysiology, which is necessary if human exploration in Space is to continue on a successful path.

  20. Biomass performance : monitoring and control in bio-pharmaceutical production

    NARCIS (Netherlands)

    Neeleman, R.

    2002-01-01

    The primary concern in the pharmaceutical industry is not the optimisation of product yield or the reduction of manufacturing cost, but the production of a product of consistently high quality. This has resulted in 'process monitoring' becoming an integral part of process operation. In this

  1. Biomass Performance : Monitoring and Control in Pharmaceutical Production

    NARCIS (Netherlands)

    Neeleman, R.

    2002-01-01

    The primary concern in the pharmaceutical industry is not the optimisation of product yield or the reduction of manufacturing cost, but the production of a product of consistently high quality. This has resulted in 'process monitoring' becoming an integral part of process operation. In this thesis p

  2. Development and implementation of a PV performance monitoring system based on inverter measurements

    DEFF Research Database (Denmark)

    Spataru, Sergiu; Gavriluta, Anamaria Florina; Maaløe, Lars

    2016-01-01

    currently the cost of the performance monitoring hardware and implementation is high. Therefore, we present the practical development and implementation of a PV performance monitoring system for residential and commercial PV applications, where the cost of the monitoring hardware is lowered, by using......Performance monitoring and fault detection systems have become necessary for decreasing operation and maintenance cost in large photovoltaic (PV) plants, as well for maximizing plan yield and lifetime. We expect a similar development for residential and commercial PV system applications, where...... the inverter’s own monitoring and communication capabilities. We also aim to lower the implementation cost, by using a simple, but accurate performance monitoring approach, and show the practical issues that can arise when implementing such a system....

  3. Development and implementation of a PV performance monitoring system based on inverter measurements

    DEFF Research Database (Denmark)

    Spataru, Sergiu; Gavriluta, Anamaria Florina; Sera, Dezso

    2016-01-01

    applications the cost of the performance monitoring hardware and implementation is still high. Therefore, we present the practical development and implementation of a low-cost PV performance monitoring system for residential and commercial PV applications, based on the inverter’s own monitoring......Performance monitoring and fault detection systems are becoming more common in large photovoltaic (PV) plants as they can contribute to decreasing operation and maintenance costs, as well as for maximizing plant yield and lifetime. However, in case of residential and smaller commercial PV system...

  4. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    Energy Technology Data Exchange (ETDEWEB)

    Chareyron, Bruno

    2012-04-05

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 {mu}Sv/h compared to 0.15 {mu}Sv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  5. LIFAC sorbent injection desulfurization demonstration project. Final report, volume II: Project performance and economics

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This publication discusses the demonstration of the LIFAC sorbent injection technology at Richmond Power and Light`s Whitewater Valley Unit No. 2, performed under the auspices of the U.S. Department of Energy`s (DOE) Clean Coal Technology Program. LIFAC is a sorbent injection technology capable of removing 75 to 85 percent of a power plant`s SO{sub 2} emissions using limestone at calcium to sulfur molar ratios of between 2 and 2.5 to 1. The site of the demonstration is a coal-fired electric utility power plant located in Richmond, Indiana. The project is being conducted by LIFAC North America (LIFAC NA), a joint venture partnership of Tampella Power Corporation and ICF Kaiser Engineers, in cooperation with DOE, RP&L, and Research Institute (EPRI), the State of Indiana, and Black Beauty Coal Company. The purpose of Public Design Report Volume 2: Project Performance and Economics is to consolidate, for public use, the technical efficiency and economy of the LIFAC Process. The report has been prepared pursuant to the Cooperative Agreement No. DE-FC22-90PC90548 between LIFAC NA and the U.S. Department of Energy.

  6. Summary of operations and performance of the Murdock site restoration project in 2007.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-06-03

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief

  7. Yakima/Klickitat Fisheries Project - Klickitat Monitoring and Evaluation, 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zendt, Joe; Babcock, Mike [Yakama Nation Fisheries Resource Management

    2006-04-02

    This report describes the results of monitoring and evaluation (M&E) activities for salmonid fish populations and habitat in the Klickitat River subbasin in south-central Washington. The M&E activities described here were conducted as a part of the Bonneville Power Administration (BPA)-funded Yakima/Klickitat Fisheries Project (YKFP) and were designed by consensus of the scientists with the Yakama Nation (YN) Fisheries Program. YKFP is a joint project between YN and Washington Department of Fish and Wildlife (WDFW). Overall YKFP goals are to increase natural production of and opportunity to harvest salmon and steelhead in the Yakima and Klickitat subbasins using hatchery supplementation, harvest augmentation and habitat improvements. Klickitat subbasin M&E activities have been subjected to scientific and technical review by members of the YKFP Science/Technical Advisory Committee (STAC) as part of the YKFP's overall M&E proposal. Yakama Nation YKFP biologists have transformed the conceptual design into the tasks described. YKFP biologists have also been involved with the Collaborative Systemwide Monitoring and Evaluation Project (CSMEP - a project aimed at improving the quality, consistency, and focus of fish population and habitat data to answer key M&E questions relevant to major decisions in the Columbia Basin) and are working towards keeping Klickitat M&E activities consistent with CSMEP recommendations. This report summarizes progress and results for the following major categories of YN-managed tasks under this contract: (1) Monitoring and Evaluation - to gather baseline information in order to characterize habitat and salmonid populations pre- and post-habitat restoration and pre-supplementation. (2) Ecological Interactions - to determine presence of pathogens in wild and naturally produced salmonids in the Klickitat Basin and develop supplementation strategies using this information. (3) Genetics - to develop YKFP supplementation broodstock collection

  8. The Multi-Isotope Process Monitor Project: FY11 Progress and Accomplishments

    Energy Technology Data Exchange (ETDEWEB)

    Orton, Christopher R.; Fraga, Carlos G.; Hayes, John W.; Schwantes, Jon M.; Bender, Sarah E.; Unlu, Kenan; Dayman, Kenneth J.; Schreiber, S. S.; Landsberger, Sheldon

    2012-08-01

    Summary The Multi-Isotope Process (MIP) Monitor represents a potentially new and efficient approach to monitoring process conditions in reprocessing facilities with the high-level goal of aiding in the “...(minimization of) the risks of nuclear proliferation and terrorism” (Office of Technology Assessment 1995). This approach relies on multivariate analysis and gamma spectroscopy of spent fuel product and waste streams to automatically and simultaneously monitor a variety of process conditions (e.g., acid concentrations, burnup, cooling time, etc.) in near real-time (NRT). While the conceptual basis for the MIP Monitor has been shown to be effective in an aqueous reprocessing system, the fundamental approach should also be viable in a pyro-processing recycle system. The MIP Monitor may be calibrated to provide online quantitative information about process variables for process control or domestic safeguards applications; or it can simply monitor, with a built-in information barrier, for off-normal conditions in process streams, making the approach well-suited for applications were it is necessary to respect proprietary information or for international safeguards applications. Proof-of-concept simulations and experiments were performed in previous years demonstrating the validity of this tool in a laboratory setting. This report details follow-on research and development efforts sponsored by the U.S. Department of Energy Fuel Cycle Research and Development (FCR&D) related to the MIP Monitor for fiscal year 2011 (FY11).

  9. Topographic analysis of the development of individual activation patterns during performance monitoring in medial frontal cortex

    National Research Council Canada - National Science Library

    Perkins, Suzanne C; Welsh, Robert C; Stern, Emily R; Taylor, Stephan F; Fitzgerald, Kate D

    2013-01-01

    ...., performance on task). In this study, 22 youth (ages 8-17 years) and 21 adults (ages 23-51 years) underwent functional magnetic resonance imaging during a performance monitoring task examining interference and errors...

  10. Earth Observation in aid of surge monitoring and forecasting: ESA's eSurge Project

    Science.gov (United States)

    Harwood, Phillip; Cipollini, Paolo; Snaith, Helen; Høyer, Jacob; Dwyer, Ned; Dunne, Declan; Stoffelen, Ad; Donlon, Craig

    2013-04-01

    The understanding and realistic modelling of surges supports both preparation and mitigation activities and should eventually bring enormous societal benefits, especially to some of the world's poorest countries. Earth Observation data from satellites have an important role to play in storm surge monitoring and forecasting, but the full uptake of these data by the users (such as environmental agencies and tidal prediction centres) must be first encouraged by showcasing their usefulness, and then supported by providing easy access. The European Space Agency has recognized the above needs and, through its Data User Element (DUE) programme, has initiated in 2011 the eSurge project, whose aims are: a) to contribute through Earth Observation to an integrated approach to storm surge, wave, sea-level and flood forecasting as part of a wider optimal strategy for building an improved forecast and warning capability for coastal inundation; and b) to increase the use of the advanced capabilities of ESA and other satellite data for storm surge applications. The project is led by Logica UK, with NOC (UK), DMI (Denmark), CMRC (Ireland) and KNMI (Netherlands) as scientific partners. eSurge aims to provide easy access to a wide range of relevant data for a range of historical surge events, as well as performing a series of experiments to demonstrate the value of this data, and running workshops and training courses to help users make use of the available data. The eSurge database of Earth Observation and in situ measurements for past surge events is now publicly available. In 2013 the project moves into its service demonstration phase, adding more data and events, including a demonstration near real time service. The project works closely with its users in order to meet their needs and to maximise the return of this data. A novel dataset provided by eSurge is coastal altimetry. Coastal altimetry has a prominent role to play as it measures directly the total water level envelope

  11. QoS-aware precautionary performance monitoring for PCE-based coherent optical OFDM networks

    Institute of Scientific and Technical Information of China (English)

    Yueming Lu; Lianxing Hou

    2012-01-01

    A quality-of-service (QoS) aware scheme,called precautionary performance monitoring,is proposed to solve the optical impairments and congestion control in coherent optical orthogonal frequency division multiplexed (CO-OFDM) networks.The centralized path computation element (PCE) extensions based on the QoS level are applied to optical performance monitoring in this letter.

  12. Investigating General Chemistry Students' Metacognitive Monitoring of Their Exam Performance by Measuring Postdiction Accuracies over Time

    Science.gov (United States)

    Hawker, Morgan J.; Dysleski, Lisa; Rickey, Dawn

    2016-01-01

    Metacognitive monitoring of one's own understanding plays a key role in learning. An aspect of metacognitive monitoring can be measured by comparing a student's prediction or postdiction of performance (a judgment made before or after completing the relevant task) with the student's actual performance. In this study, we investigated students'…

  13. Investigating General Chemistry Students' Metacognitive Monitoring of Their Exam Performance by Measuring Postdiction Accuracies over Time

    Science.gov (United States)

    Hawker, Morgan J.; Dysleski, Lisa; Rickey, Dawn

    2016-01-01

    Metacognitive monitoring of one's own understanding plays a key role in learning. An aspect of metacognitive monitoring can be measured by comparing a student's prediction or postdiction of performance (a judgment made before or after completing the relevant task) with the student's actual performance. In this study, we investigated students'…

  14. Interactions of Team Mental Models and Monitoring Behaviors Predict Team Performance in Simulated Anesthesia Inductions

    Science.gov (United States)

    Burtscher, Michael J.; Kolbe, Michaela; Wacker, Johannes; Manser, Tanja

    2011-01-01

    In the present study, we investigated how two team mental model properties (similarity vs. accuracy) and two forms of monitoring behavior (team vs. systems) interacted to predict team performance in anesthesia. In particular, we were interested in whether the relationship between monitoring behavior and team performance was moderated by team…

  15. Quality assurance and performance improvement in intraoperative neurophysiologic monitoring programs.

    Science.gov (United States)

    Tamkus, Arvydas A; Rice, Kent S; McCaffrey, Michael T

    2013-03-01

    Quality assurance (QA) as it relates to intraoperative neurophysiological monitoring (IONM) can be defined as the systematic monitoring, evaluation, and modification of the IONM service to insure that desired standards of quality are being met. In practice, that definition is usually extended to include the concept that the quality of the IONM service will be improved wherever possible and, although there are some differences in the two terms, in this article the term QA will be understood to include quality improvement (QI) processes as well. The measurement and documentation of quality is becoming increasingly important to healthcare providers. This trend is being driven by pressures from accrediting agencies, payers, and patients. The essential elements of a QA program are described. A real-life example of QA techniques and management relevant to IONM providers is presented and discussed.

  16. Sustainable Seas Student Intertidal Monitoring Project at Duxbury Reef in Bolinas, CA

    Science.gov (United States)

    Rainsford, A.; Soave, K.; Gerraty, F.; Jung, G.; Quirke-Shattuck, M.; Kudler, J.; Hatfield, J.; Emunah, M.; Dean, A. F.

    2014-12-01

    The Sustainable Seas Student Monitoring Project at the Branson School in Ross, CA has monitored Duxbury Reef in Bolinas, CA since 1999, in cooperation with the Farallones Marine Sanctuary Association and the Gulf of Farallones National Marine Sanctuary. Goals of this student-run project include: 1) To monitor the rocky intertidal habitat and develop a baseline database of invertebrates and algal density and abundance; 2) To contribute to the conservation of the rocky intertidal habitat through education of students and visitors about intertidal species; 3) To increase stewardship in the Gulf of the Farallones National Marine Sanctuary; and 4) To contribute abundance and population data on key algae and invertebrate species to the national database, LiMPETS (Long Term Monitoring Program & Experiential Training for Students). Each fall student volunteers complete an intensive training course on the natural history of intertidal invertebrates and algae, identification of key species, rocky intertidal monitoring techniques, and history of the sanctuary. Students identify and count key invertebrate and algae species along two permanent transects and, using randomly determined points, within two permanent 200 m2 areas, in fall, winter, and late spring. Using data from the previous years, we will compare population densities, seasonal abundance and long-term population trends of key algal and invertebrate species, including Tegula funebralis, Anthopluera elegantissima, Cladophora sp. and Fucus sp.. Future analyses and investigations will include intertidal abiotic factors (including water temperature, pH and human foot-traffic) to enhance insights into the Duxbury Reef ecosystem, in particular, the high and mid-intertidal zones experiencing the greatest amount of human impacts.

  17. A guide to environmental monitoring data, 1945--1972: Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Thiede, M.E.; Bates, D.J.; Mart, E.I.; Hanf, R.W.

    1994-03-01

    This report is a guide to the work accomplished by the Environmental Monitoring Data Task, which is one of the tasks in the Hanford Environmental Dose Reconstruction (HEDR) Project. The objective of the Environmental Monitoring Data Task was to recover, evaluate, process, and/or reconstruct the environmental monitoring data for the period 1945--1972. The period of time for which environmental monitoring data were sought was determined by the start-up and shut-down dates of the Hanford facilities that emitted the majority of radionuclides to the two major pathways: air and the Columbia River. Radionuclide emissions to the air were mainly the result of the operation of the chemical separations plants from 1944--1972 (Heeb 1994). Radionuclide emissions to the Columbia River were mainly the result of the operation of the single-pass production reactors from 1944--1971 (Heeb and Bates 1994). Therefore, the historical environmental monitoring data sought were for the period 1945--1972. Within the period of 1945--1972, specific periods of interest to the HEDR Project vary depending on the pathway. For example, 1945--1951 was the peak period for radionuclide emissions to the air and hence vegetation uptake of radionuclides, while 1956--1965 was the peak period for radionuclide emissions to the Columbia River and hence fish uptake of radionuclides. However, adequate historical data were not always available for the periods of interest. In the case of vegetation measurements, conversion and correction factors had to be developed to convert the historical measurements to modern standard measurements. Table S.1 lists the reports that explain these conversion and correction factors. In the case of Columbia River fish and waterfowl, bioconcentration factors were developed for use in any year where the river pathway data are insufficient.

  18. The Importance of Management Control in Monitoring the Pharmaceutical Industry Performance for Competitive Advantage

    Directory of Open Access Journals (Sweden)

    Florinel Marian SGARDEA

    2011-12-01

    Full Text Available Management control and thus managerial accounting will adapt to the requirements of market economy in terms of knowledge. Another thought other action. The sustainability of a business depends on how we use resources but also can correct measurement of performance of a project or activity. The distinction between ‘traditional’ and ‘innovative’ management accounting practices can be illustrated by reference to cost control techniques. Traditionally, management accountants’ principal technique was variance analysis, which is a systematic approach to the comparison of the actual (real costs and budgeted costs of the raw materials and labor used during a production period. In this paper we wanted to show that the new management control procedures are part of knowledge management. Today is important for pharmaceutical companies to produce new products of advanced research results. This means that, for large companies, research expenditure budget is generous. More projects need to be monitored, evaluated and presented to the Board of Directors. What indicators will be kept for financial analysis? How prospective financial situation will look in five years? What will be the level of risk accepted by investors?

  19. Projects to improve mathematics performance at a university of technology

    Directory of Open Access Journals (Sweden)

    Ina Louw

    2009-09-01

    Full Text Available Lecturers at tertiary institutions have been expressing concern about the quality of students in mathematics for a long time now. Blame is usually placed at the door of secondary schools, but through put figures are still determining state subsidies and as such necessitate institutions to constantly revisit their efforts in terms of improving performance in mathematics. In this article, the results of two studies to improve the mathematics performance at a technical university are reported. The first study took place at the former Technikon Northern Gauteng and was an action research project with an experimental design. The study entailed the implementation of tutorial sessions and it revealed certain traits of tertiary mathematics education. Data were collected through structured observation, questionnaires and focus group interviews. A standardized questionnaire, Study Orientation Questionnaire in Maths (SOM, was introduced and “study habits” was the field in the test that featured most significantly in both the experimental and the control groups. The results revealed, inter alia, that timely assessment is needed to detect and correct misconceptions as soon as possible. It also pointed out that attendance of lectures (and tutorials impacted strongly on performance. Lastly, it was found that students preferred communicating mathematics through the medium of English and not by using their mother tongue. The second project was conducted at the Tshwane University of Technology (TUT and consisted of an investigation into assessment practices in first year mathematics. The study was executed with action research as strategy and data were collected through interviews, questionnaires and focus group interviews. Qualitative and quantitative data were collected and respondents were exposed to contemporary assessment strategies as suggested by OBE. The aim of the study was to enhance the respondents’ insight into contemporary assessment

  20. 5 CFR 9701.407 - Monitoring performance and providing feedback.

    Science.gov (United States)

    2010-01-01

    ... feedback. 9701.407 Section 9701.407 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN... performance and providing feedback. In applying the requirements of the performance management system and its... organization; and (b) Provide timely periodic feedback to employees on their actual performance with respect...

  1. MEASURING THE PERFORMANCE OF GUYANA’S CONSTRUCTION INDUSTRY USING A SET OF PROJECT PERFORMANCE BENCHMARKING METRICS

    Directory of Open Access Journals (Sweden)

    Christopher J. Willis

    2011-10-01

    Full Text Available A study measuring the performance of Guyana’s construction industry using a set of project performance benchmarking metrics was recently completed. The underlying premise of the study was that the aggregated performance of construction projects provides a realistic assessment of the performance of the construction industry, on the basis that construction projects are the mechanism through which the construction industry creates its tangible products. The fact that an influential government agency acted as owner of the study was critical to the data collection phase. The best approach for collecting project performance data in Guyana involves the utilisation of a researcher or team of researchers mining electronic and hard copy project documents. This study analysed approximately 270 construction projects to obtain an indication of the performance of guyana’s construction industry. It was found that sea defence projects performed the worst, whereas health facility projects performed the best. The main implication of this is that sea defence projects are likely to be the least efficient and, given their critical nature, there is an argument for urgent performance improvement interventions.

  2. The Multi-Isotope Process (MIP) Monitor Project: FY12 Progress and Accomplishments

    Energy Technology Data Exchange (ETDEWEB)

    Coble, Jamie B.; Orton, Christopher R.; Jordan, David V.; Schwantes, Jon M.; Bender, Sarah; Dayman, Kenneth J.; Unlu, Kenan; Landsberger, Sheldon

    2012-09-27

    The Multi-Isotope Process (MIP) Monitor, being developed at Pacific Northwest National Laboratory (PNNL), provides an efficient approach to monitoring the process conditions in reprocessing facilities in support of the goal of "...(minimization of) the risks of nuclear proliferation and terrorism." The MIP Monitor measures distributions of a suite of indicator (radioactive) isotopes present within product and waste streams of a nuclear reprocessing facility. These indicator isotopes are monitored on-line by gamma spectrometry and compared, in near-real-time, to spectral patterns representing "normal" process conditions using multivariate pattern recognition software. The monitor utilizes this multivariate analysis and gamma spectroscopy of reprocessing streams to detect small changes in the gamma spectrum, which may indicate changes in process conditions. Multivariate analysis methods common in chemometrics, such as principal component analysis (PCA) and partial least squares regression (PLS), act as pattern recognition techniques, which can detect small deviations from the expected, nominal condition. By targeting multiple gamma-emitting indicator isotopes, the MIP Monitor approach is compatible with the use of small, portable, relatively high-resolution gamma detectors that may be easily deployed throughout an existing facility. The automated multivariate analysis can provide a level of data obscurity, giving a built-in information barrier to protect sensitive or proprietary operational data. Proof-of-concept simulations and experiments have been performed in previous years to demonstrate the validity of this tool in a laboratory setting. Development of the MIP Monitor approach continues to evaluate the efficacy of the monitor for automated, real-time or near-real-time application. This report details follow-on research and development efforts sponsored by the U.S. Department of Energy Fuel Cycle Research and Development related to the MIP Monitor for fiscal year

  3. Technology Performance Report: Duke Energy Notrees Wind Storage Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Wehner, Jeff [Duke Energy Renewables, Charlotte, NC (United States); Mohler, David [Duke Energy Renewables, Charlotte, NC (United States); Gibson, Stuart [Duke Energy Renewables, Charlotte, NC (United States); Clanin, Jason [Duke Energy Renewables, Charlotte, NC (United States); Faris, Don [Duke Energy Renewables, Charlotte, NC (United States); Hooker, Kevin [Duke Energy Renewables, Charlotte, NC (United States); Rowand, Michael [Duke Energy Renewables, Charlotte, NC (United States)

    2015-11-01

    Duke Energy Renewables owns and operates the Notrees Wind Farm in west Texas’s Ector and Winkler counties. The wind farm, which was commissioned in April 2009, has a total capacity of 152.6 MW generated by 55 Vestas V82 turbines, one Vestas 1-V90 experimental turbine, and 40 GE 1.5-MW turbines. The Vestas V82 turbines have a generating capacity of 1.65 MW each, the Vestas V90 turbine has a generating capacity of 1.86 MW, and the GE turbines have a generating capacity of 1.5 MW each. The objective of the Notrees Wind Storage Demonstration Project is to validate that energy storage increases the value and practical application of intermittent wind generation and is commercially viable at utility scale. The project incorporates both new and existing technologies and techniques to evaluate the performance and potential of wind energy storage. In addition, it could serve as a model for others to adopt and replicate. Wind power resources are expected to play a significant part in reducing greenhouse gas emissions from electric power generation by 2030. However, the large variability and intermittent nature of wind presents a barrier to integrating it within electric markets, particularly when competing against conventional generation that is more reliable. In addition, wind power production often peaks at night or other times when demand and electricity prices are lowest. Energy storage systems can overcome those barriers and enable wind to become a valuable asset and equal competitor to conventional fossil fuel generation.

  4. Sustainable Seas Student Intertidal Monitoring Project at Duxbury Reef in Bolinas, CA (Invited)

    Science.gov (United States)

    Soave, K.; Dean, A.; Darakananda, K.; Ball, O.; Butti, C.; Yang, G.; Vetter, M.; Grimaldi, Z.

    2009-12-01

    Sustainable Seas Student Intertidal Monitoring Project at Duxbury Reef in Bolinas, CA Kathy Soave, Amy Dean, Olivia Ball, Karin Darakananda, Matt Vetter, Grant Yang, Charlotte Butti, Zoe Grimaldi The Sustainable Seas Student Monitoring Project at the Branson School in Ross, CA has monitored Duxbury Reef in Bolinas, CA since 1999, in cooperation with the Farallones Marine Sanctuary Association and the Gulf of Farallones National Marine Sanctuary. Goals of the project include: 1) To monitor the rocky intertidal habitat and develop a baseline database of invertebrates and algal density and abundance; 2) To contribute to the conservation of the rocky intertidal habitat through education of students and visitors about intertidal species and the requirements for maintaining a healthy, diverse intertidal ecosystem; 3) To increase stewardship in the Gulf of the Farallones National Marine Sanctuary; and 4) To contribute abundance and population data on key algae and invertebrate species to the national database, LiMPETS (Long Term Monitoring Program & Experiential Training for Students). Student volunteers complete an intensive training course on the natural history of intertidal invertebrates and algae, identification of key species, rocky intertidal monitoring techniques, and history of the sanctuary. Students identify and count key invertebrate and algae species along two permanent transects (A and B) and using randomly determined points within a permanent 100 m2 area, three times per year (fall, winter, and late spring). Using the data collected since 2004, we will analyze the population densities, seasonal abundance and long-term population trends of key algal and invertebrate species. Future analyses and investigations will include intertidal abiotic factors (including water temperature and human foot-traffic) to enhance insights into the workings of the Duxbury Reef ecosystem, in particular, the high intertidal zone which experiences the greatest amount of human

  5. Comparison of viewing angle and observer performances in different types of liquid-crystal display monitors.

    Science.gov (United States)

    Hatanaka, Shiro; Morishita, Junji; Hiwasa, Takeshi; Dogomori, Kiyoshi; Toyofuku, Fukai; Ohki, Masafumi; Higashida, Yoshiharu

    2009-07-01

    It is known that the performance of liquid-crystal display (LCD) monitors, such as the luminance and contrast ratio, is dependent on the viewing angle. Our purpose in this study was to compare the angular performance and the effect on observer performance of different types of LCD monitors. The luminance performance and contrast ratio as a function of viewing angle (-60 degrees to 60 degrees) in each direction for two types of LCD monitors, namely, a general-purpose LCD monitor and one especially designed for medical use, were measured in this study. Furthermore, the observer performance at various viewing angles in the horizontal direction for a medical-grade LCD monitor was investigated by eight observers based on a contrast-detail diagram. The two types of LCD monitors showed notable variations in luminance and contrast ratio as a function of the viewing angle. Acceptable viewing angles in terms of the contrast ratio were much smaller in each direction than those for nominal viewing angles in the specifications provided by the manufacturers, and those for the medical-grade LCD monitor in the horizontal and vertical directions were broader than those of the general-purpose LCD monitor. There was no significant difference in observer performance between 0 degrees and 40 degrees. On the other hand, our results showed a statistically significant difference in observer performance between 0 degrees and 60 degrees.

  6. The participatory design of a performance oriented monitoring and evaluation system in an international development environment.

    Science.gov (United States)

    Guerra-López, Ingrid; Hicks, Karen

    2015-02-01

    This article illustrates the application of the impact monitoring and evaluation process for the design and development of a performance monitoring and evaluation framework in the context of human and institutional capacity development. This participative process facilitated stakeholder ownership in several areas including the design, development, and use of a new monitoring and evaluation system, as well their targeted results and accomplishments through the use of timely performance data gathered through ongoing monitoring and evaluation. The process produced a performance indicator map, a comprehensive monitoring and evaluation framework, and data collection templates to promote the development, implementation, and sustainability of the monitoring and evaluation system of a farmer's trade union in an African country. Copyright © 2014 Elsevier Ltd. All rights reserved.

  7. Miniaturized, Multi-Analyte Sensor Array for the Automated Monitoring of Major Atmospheric Constituents in Spacecraft Environment Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the Phase II SBIR project is to develop a prototype sensor system to detect gaseous analytes in support of the spacecraft environmental monitoring...

  8. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  9. Basic Guidelines for Performance Monitoring of Shipboard Machinery

    Science.gov (United States)

    1975-11-01

    Cooke SnÄS £ChÄi ÄrÄ^IÄ Houston, TX, March 197 5) "Details are given of an integrated engine health monitoring ( EHM ) program for use by...choice of partic- ular EHM methods is given followed by a description of the data collection and analysis procedures. Emphasis is placed on...In this case the acoustic signals are so strong that they are audible without any equipment; modern AE instruments, on the other hand, are

  10. Examining the performance of the brief addiction monitor.

    Science.gov (United States)

    Nelson, Karl G; Young, Kevin; Chapman, Heather

    2014-04-01

    The Center for Excellence in Drug Abuse Treatment and Education (Center for Excellence in Substance Abuse Treatment and Education (CESATE; 2010). Brief Addiction Monitor: Manual of Operations. Philadelphia, PA) recently suggested that Veterans Affairs' (VA) addictions treatment programs, in order to encourage measurement based care, begin using a new measure of substance abuse, the Brief Addictions Monitor (BAM). To date, only one study Caccolia et al, 2013. Development and initial evaluation of the Brief Addiction Monitor (BAM). Journal of Substance Abuse Treatment, 44, 256-63. doi: http://dx.doi.org/10.1016/j.jsat.2012.07.013) has examined the psychometric properties of a version of this instrument. However, this study did not use the version of the BAM currently available to most VA providers via the mental health assistant software; rather, the authors reported the properties of a BAM where most of the items had continuous (or near continuous) response options. The current study seeks to provide data on the version of the BAM which uses 5 point Likert scale response options for its questions, the version available on the mental health assistant software. Based on data from more than 700 veterans enrolled in out-patient (OP) and in-patient (IP) addictions treatment programs, this study examined the factor structure, reliability, and validity of this version of the BAM. Across both groups, results suggested that the BAM lacked a reliable factor structure, in contrast to the findings from the earlier study. However, a single scale, composed of a minority of items on the BAM, showed promise. A minority of the items (five) provided valid information across both OP and IP samples when applied individually, as indicated by convergent and divergent validity comparisons with other measures of functioning; tracking changes in functioning over the course of treatment; and correlating with changes in convergent and divergent validity measures. This partially supported the

  11. Performance of long-term CT monitoring in diagnosing bronchiolitis obliterans after lung transplantation

    Energy Technology Data Exchange (ETDEWEB)

    Berstad, Audun E. [Department of Radiology, Rikshospitalet University Hospital, Sognsvannsveien 20, N-0027 Oslo (Norway)]. E-mail: a.e.berstad@medisin.uio.no; Aalokken, Trond Mogens [Department of Radiology, Rikshospitalet University Hospital, Sognsvannsveien 20, N-0027 Oslo (Norway); Kolbenstvedt, Alf [Department of Radiology, Rikshospitalet University Hospital, Sognsvannsveien 20, N-0027 Oslo (Norway); Bjortuft, Oystein [Department of Thoracic Medicine, Rikshospitalet University Hospital, Sognsvannsveien 20, N-0027 Oslo (Norway)

    2006-04-15

    Aim: The purpose of the study was to evaluate the ability of CT, including expiratory scans with minimum intensity projection in predicting the development of bronchiolitis obliterans syndrome after lung transplantation. Materials and methods: Forty consecutive patients, 29 bilateral and 11 single lung transplanted, were followed-up with regular scans for a median of 36 months. Air trapping was evaluated on expiratory scans constructed from two short spiral scans with minimum intensity projection-technique, one at the level of the carina and the other midway between the right diaphragm and the carina. Air trapping was scored on a 16-point scale. Bronchiolitis obliterans syndrome was diagnosed according to established clinical criteria and quantified spirometrically. Results: Bronchiolitis obliterans syndrome developed in 17 patients (43%) after a median of 12 months. Air trapping and bronchiectasis was seen before the diagnosis of bronchiolitis obliterans syndrome in only two and one patient, respectively. Interobserver agreement for air trapping score was good (kappa = 0.65). Air trapping scores performed significantly better than that achieved by chance alone in determining the presence of bronchiolitis obliterans syndrome (P = 0.0025). An air trapping score of 4 or more provided the best results with regard to sensitivity and specificity in diagnosing bronchiolitis obliterans syndrome. The sensitivity, specificity, positive and negative predictive values of an air trapping of 4 or more in the diagnosis of bronchiolitis obliterans syndrome were 77, 74, 68 and 81%, respectively. Conclusion: Expiratory CT scans with minimum intensity projection-reconstruction did not predict the development of bronchiolitis obliterans syndrome in most patients. The findings seriously limit the clinical usefulness of long-term CT monitoring for diagnosing bronchiolitis obliterans syndrome after lung transplantation.

  12. 5 CFR 9901.409 - Monitoring and developing performance.

    Science.gov (United States)

    2010-01-01

    ... of management and employees. Developing performance includes but is not limited to—(1) Coaching and mentoring employees; (2) Reinforcing strengths and addressing weaknesses; and (3) Discussing...

  13. [Monitoring populations of rodent reservoirs of zoonotic diseases. Projects, aims and results].

    Science.gov (United States)

    Jacob, J; Ulrich, R G; Freise, J; Schmolz, E

    2014-05-01

    Rodents can harbor and transmit pathogens that can cause severe disease in humans, companion animals and livestock. Such zoonotic pathogens comprise more than two thirds of the currently known human pathogens. The epidemiology of some zoonotic pathogens, such as hantaviruses, can be linked to the population dynamics of the rodent host. In this case, during an outbreak of the rodent host population many human infections may occur. In other rodent-borne zoonotic diseases such phenomena are not known and in many cases the rodent host specificity of a given pathogen is unclear. The monitoring of relevant rodent populations and of the rodent-borne zoonotic pathogens is essential to (1) understand the distribution and epidemiology of pathogens and (2) develop forecasting tools to predict outbreaks of zoonoses. Presently, there are no systematic long-term monitoring programs in place for zoonoses in Germany. Rodent monitoring activities are largely restricted to the plant protection sector, such as for the common vole (Microtus arvalis) and forest-damaging rodents. However, during the last 10-15 years a number of specific research projects have been initiated and run for a few years and Norway rat (Rattus norvegicus) monitoring has been implemented in Hamburg and Lower Saxony. Based on close cooperation of federal and state authorities and research institutions these efforts could be utilized to gain information about the distribution and importance of rodent-borne zoonoses. Nevertheless, for the integration of rodent population dynamics and zoonotic disease patterns and especially for developing predictive models, long-term monitoring is urgently required. To establish a systematic long-term monitoring program, existing networks and cooperation need to be used, additional collaborators (e.g., pest control operators) should be included and synergetic effects of different scientific fields should be utilized.

  14. Performance of a newly designed continuous soot monitoring system (COSMOS).

    Science.gov (United States)

    Miyazaki, Yuzo; Kondo, Yutaka; Sahu, Lokesh K; Imaru, Junichi; Fukushima, Nobuhiko; Kano, Minoru

    2008-10-01

    We designed a continuous soot monitoring system (COSMOS) for fully automated, high-sensitivity, continuous measurement of light absorption by black carbon (BC) aerosols. The instrument monitors changes in transmittance across an automatically advancing quartz fiber filter tape using an LED at a 565 nm wavelength. To achieve measurements with high sensitivity and a lower detectable light absorption coefficient, COSMOS uses a double-convex lens and optical bundle pipes to maintain high light intensity and signal data are obtained at 1000 Hz. In addition, sampling flow rate and optical unit temperature are actively controlled. The inlet line for COSMOS is heated to 400 degrees C to effectively volatilize non-refractory aerosol components that are internally mixed with BC. In its current form, COSMOS provides BC light absorption measurements with a detection limit of 0.45 Mm(-1) (0.045 microg m(-3) for soot) for 10 min. The unit-to-unit variability is estimated to be within +/- 1%, demonstrating its high reproducibility. The absorption coefficients determined by COSMOS agreed with those by a particle soot absorption photometer (PSAP) to within 1% (r2 = 0.97). The precision (+/- 0.60 Mm(-1)) for 10 min integrated data was better than that of PSAP and an aethalometer under our operating conditions. These results showed that COSMOS achieved both an improved detection limit and higher precision for the filter-based light absorption measurements of BC compared to the existing methods.

  15. An Investigation of Structural Capacity as a Component of Monitoring and Evaluation in Project Success of Road Construction Projects in Kenya

    Directory of Open Access Journals (Sweden)

    Ali Ibrahim Hassan

    2013-08-01

    Full Text Available The transport sector in Kenya contributes about 6% of the gross domestic product and is critical in providing the necessary linkages for promoting national and regional interconnectivity as well as trade. Developments in the road construction industry in Kenya are increasing in size, technology complexity, interdependencies, and variations in demands from clients. Enormous donor and government resources are provided to various road contractors for the construction of road projects in Kenya.Monitoring and evaluation of road projects implementation is paramount in determining the success of road construction projects. It is hypothesized that poor and inefficient monitoring and evaluation of road construction projects could be one of the causes of endemic project delays and poor workmanships on completed road projects. It was therefore imperative to examine the monitoring and evaluation systems used in road construction projects in Kenya, and assess their effectiveness, with a particular emphasis on the components of monitoring and evaluation system. The objective of this study was therefore to assess the influence of monitoring and evaluation system on project success. The target population of this study was the road contractors and regulatory bodies involved in ongoing road construction projects in Nairobi city and its environs. A descriptive study design was used to collect quantitative and qualitative data. Primary data was collected by use of structured questionnaires. The questionnaire was designed to respond to research question. Secondary data was collected through review of published literature such as journal articles, published theses and textbooks. The data collected from the field was captured using Statistical Package for Social Sciences (SPSS and Microsoft excel. Descriptive statistics including frequency, percentages and means were employed and a summary graphs, pie charts and frequency distribution tables given. Content analysis

  16. A Web-Based System for Monitoring and Controlling Multidisciplinary Design Projects

    Science.gov (United States)

    Salas, Andrea O.; Rogers, James L.

    1997-01-01

    In today's competitive environment, both industry and government agencies are under enormous pressure to reduce the time and cost of multidisciplinary design projects. A number of frameworks have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. An examination of current frameworks reveals weaknesses in various areas such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, in conjunction with an existing framework, can improve these areas of weakness. This paper describes a system that executes a sequence of programs, monitors and controls the design process through a Web-based interface, and visualizes intermediate and final results through the use of Java(Tm) applets. A small sample problem, which includes nine processes with two analysis programs that are coupled to an optimizer, is used to demonstrate the feasibility of this approach.

  17. Monitoring and Evaluation of Environmental Flow Prescriptions for Five Demonstration Sites of the Sustainable Rivers Project

    Science.gov (United States)

    Konrad, Christopher P.

    2010-01-01

    The Nature Conservancy has been working with U.S. Army Corps of Engineers (Corps) through the Sustainable Rivers Project (SRP) to modify operations of dams to achieve ecological objectives in addition to meeting the authorized purposes of the dams. Modifications to dam operations are specified in terms of environmental flow prescriptions that quantify the magnitude, duration, frequency, and seasonal timing of releases to achieve specific ecological outcomes. Outcomes of environmental flow prescriptions implemented from 2002 to 2008 have been monitored and evaluated at demonstration sites in five rivers: Green River, Kentucky; Savannah River, Georgia/South Carolina; Bill Williams River, Arizona; Big Cypress Creek, Texas; and Middle Fork Willamette River, Oregon. Monitoring and evaluation have been accomplished through collaborative partnerships of federal and state agencies, universities, and nongovernmental organizations.

  18. 2009 Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-03-01

    This report presents the 2009 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the PSA during fiscal year 2009.

  19. Fast flux test facility performance monitoring management information, July 1989

    Energy Technology Data Exchange (ETDEWEB)

    Newland, D J

    1989-08-01

    The purpose of this report is to provide management with performance data on key performance indicators selected from the FFTF Early Warning System performance indicators. Very good performance for the month of July was highlighted by continuos full power operation for the entire month and by extremely low plant personnel radiation exposure during the second quarter of 1989. In spite of increased effort this month, the corrective maintenance work off rate continued to rise. Increased FFTF resource efforts will continue on this indicator as well as Other Performance Indicators which reflect undesirable trends. Increased Westinghouse Hanford Company emphasis continues to be placed on improving the Operations staffing levels. Extensive use of overtime and support shift personnel is still being required to support extra work loads imposed by non-routine evolutions.

  20. Aging Behavior and Performance Projections for a Polysulfide Elastomer

    Energy Technology Data Exchange (ETDEWEB)

    Celina, Mathias C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Giron, Nicholas Henry [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Quintana, Adam [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-05-01

    The accelerated aging behavior and aging state of a 30 year old field retrieved polysulfide elastomer was examined. The material is used as an environmental thread sealant for a stainless steel bolt in a steel threaded insert in an aluminum assembly. It is a two component curable polysulfide elastomer that is commercially available in a similar formulation as was applied 30 years ago. The primary goal of this study was to establish if aging over 30 years under moderate aging conditions (mostly ambient temperature and humidity) resulted in significant property changes, or if accelerated aging could identify developing aging pathways which would prevent the extended use of this material. The aging behavior of this material was examined in three ways: A traditional accelerated thermo-oxidative aging study between 95 to 140°C which focused on physical and chemical properties changes, an evaluation of the underlying oxidation rates between RT and 125°C, and an assessment of the aging state of a small 30 year old sample. All three data sets were used to establish aging characteristics, their time evolution, and to extrapolate the observed behavior to predict performance limits at RT. The accelerated aging study revealed a relatively high average activation energy of ~130 kJ/mol which gives overconfident performance predictions. Oxidation rates showed a decreasing behavior with aging time and a lower E a of ~84 kJ/mol from time - temperature superposition , but also predicted sufficient additional performance at RT. Consistent with these projections for extended RT performance, only small changes were observed for the 30 year old material. Extrapolations using this partially aged material also predict ongoing use as a viable option. Unexpected RT degradation could only develop into a concern should the oxidation rate not trend lower over time as was observed at elevated temperature. Considering all data acquired in this limited aging study , there are no immediately