WorldWideScience

Sample records for models 5a contract

  1. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  2. An event-based model for contracts

    Directory of Open Access Journals (Sweden)

    Tiziana Cimoli

    2013-02-01

    Full Text Available We introduce a basic model for contracts. Our model extends event structures with a new relation, which faithfully captures the circular dependencies among contract clauses. We establish whether an agreement exists which respects all the contracts at hand (i.e. all the dependencies can be resolved, and we detect the obligations of each participant. The main technical contribution is a correspondence between our model and a fragment of the contract logic PCL. More precisely, we show that the reachable events are exactly those which correspond to provable atoms in the logic. Despite of this strong correspondence, our model improves previous work on PCL by exhibiting a finer-grained notion of culpability, which takes into account the legitimate orderings of events.

  3. 7 CFR 1718.104 - Availability of model loan contract.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE LOAN SECURITY DOCUMENTS FOR ELECTRIC BORROWERS Loan Contracts With Distribution Borrowers § 1718.104 Availability of model loan contract. Single copies of the model loan contract (RUS... 7 Agriculture 11 2010-01-01 2010-01-01 false Availability of model loan contract. 1718.104 Section...

  4. A trace-based model for multiparty contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom; Klaedtke, Felix; Zălinescu, Eugen

    2012-01-01

    In this article we present a model for multiparty contracts in which contract conformance is defned abstractly as a property on traces. A key feature of our model is blame assignment, which means that for a given contract, every breach is attributed to a set of parties. We show that blame...... assignment is compositional by de¿ning contract conjunction and contract disjunction. Moreover, to specify real-world contracts, we introduce the contract speci¿cation language CSL with an operational semantics. We show that each CSL contract has a counterpart in our trace-based model and from...... the operational semantics we derive a run-time monitor. CSL overcomes limitations of previously proposed formalisms for specifying contracts by supporting: (history sensitive and conditional) commitments, parametrised contract templates, relative and absolute temporal constraints, potentially in¿nite contracts...

  5. Stochastic modeling of financial electricity contracts

    International Nuclear Information System (INIS)

    Benth, Fred Espen; Koekebakker, Steen

    2008-01-01

    We discuss the modeling of electricity contracts traded in many deregulated power markets. These forward/futures type contracts deliver (either physically or financially) electricity over a specified time period, and is frequently referred to as swaps since they in effect represent an exchange of fixed for floating electricity price. We propose to use the Heath-Jarrow-Morton approach to model swap prices since the notion of a spot price is not easily defined in these markets. For general stochastic dynamical models, we connect the spot price, the instantaneous-delivery forward price and the swap price, and analyze two different ways to apply the Heath-Jarrow-Morton approach to swap pricing: Either one specifies a dynamics for the non-existing instantaneous-delivery forwards and derives the implied swap dynamics, or one models directly on the swaps. The former is shown to lead to quite complicated stochastic models for the swap price, even when the forward dynamics is simple. The latter has some theoretical problems due to a no-arbitrage condition that has to be satisfied for swaps with overlapping delivery periods. To overcome this problem, a practical modeling approach is analyzed. The market is supposed only to consist of non-overlapping swaps, and these are modelled directly. A thorough empirical study is performed using data collected from Nord Pool. Our investigations demonstrate that it is possible to state reasonable models for the swap price dynamics which is analytically tractable for risk management and option pricing purposes, however, this is an area of further research. (author)

  6. Economic contract theory tests models of mutualism.

    Science.gov (United States)

    Weyl, E Glen; Frederickson, Megan E; Yu, Douglas W; Pierce, Naomi E

    2010-09-07

    Although mutualisms are common in all ecological communities and have played key roles in the diversification of life, our current understanding of the evolution of cooperation applies mostly to social behavior within a species. A central question is whether mutualisms persist because hosts have evolved costly punishment of cheaters. Here, we use the economic theory of employment contracts to formulate and distinguish between two mechanisms that have been proposed to prevent cheating in host-symbiont mutualisms, partner fidelity feedback (PFF) and host sanctions (HS). Under PFF, positive feedback between host fitness and symbiont fitness is sufficient to prevent cheating; in contrast, HS posits the necessity of costly punishment to maintain mutualism. A coevolutionary model of mutualism finds that HS are unlikely to evolve de novo, and published data on legume-rhizobia and yucca-moth mutualisms are consistent with PFF and not with HS. Thus, in systems considered to be textbook cases of HS, we find poor support for the theory that hosts have evolved to punish cheating symbionts; instead, we show that even horizontally transmitted mutualisms can be stabilized via PFF. PFF theory may place previously underappreciated constraints on the evolution of mutualism and explain why punishment is far from ubiquitous in nature.

  7. Army Contracting Command Workforce Model Analysis

    Science.gov (United States)

    2012-02-09

    Empresas in Madrid. His Air Force contracting experience includes F-22 Fighter, C-17 Cargo Transport , and a contingency deployment as director of Joint...and the University of Maryland (University College). He has also conducted visiting seminars at American University in Cairo and Instituto de ...the long total process times that are sometimes involved in weapon system contracting, such an assessment may equate to a de facto future work

  8. MODEL APLIKASI FIKIH MUAMALAH PADA FORMULASI HYBRID CONTRACT

    Directory of Open Access Journals (Sweden)

    Ali Murtadho

    2013-10-01

    Full Text Available Modern literatures of fiqh mu’āmalah talk alot about various contract formulation with capability of maximizing profit in shariah finance industry. This new contract modification is the synthesis among existing contracts which is formulated in such a way to be an integrated contract. This formulation is known as a hybrid contract or multicontract (al-'uqūd al-murakkabah. Some of them are, bay' bi thaman 'ājil, Ijārah muntahiyah bi ’l-tamlīk dan mushārakah mutanāqiṣah. This study intends to further describe models of hybrid contract, and explore the shari'ah principles in modern financial institutions. This study found a potential shift from the ideal values of the spirit of shari'ah into the spirit of competition based shari'ah formally.

  9. Building Information Modelling and Standardised Construction Contracts: a Content Analysis of the GC21 Contract

    Directory of Open Access Journals (Sweden)

    Aaron Manderson

    2015-08-01

    Full Text Available Building Information Modelling (BIM is seen as a panacea to many of the ills confronting the Architectural, Engineering and Construction (AEC sector. In spite of its well documented benefits the widespread integration of BIM into the project lifecycle is yet to occur. One commonly identified barrier to BIM adoption is the perceived legal risks associated with its integration, coupled with the need for implementation in a collaborative environment. Many existing standardised contracts used in the Australian AEC industry were drafted before the emergence of BIM. As BIM continues to become ingrained in the delivery process the shortcomings of these existing contracts have become apparent. This paper reports on a study that reviewed and consolidated the contractual and legal concerns associated with BIM implementation. The findings of the review were used to conduct a qualitative content analysis of the GC21 2nd edition, an Australian standardised construction contract, to identify possible changes to facilitate the implementation of BIM in a collaborative environment. The findings identified a number of changes including the need to adopt a collaborative contract structure with equitable risk and reward mechanisms, recognition of the model as a contract document and the need for standardisation of communication/information exchange.

  10. Termination of Dynamic Contracts in an Equilibrium Labor Market Model

    OpenAIRE

    Wang, Cheng

    2005-01-01

    I construct an equilibrium model of the labor market where workers and firms enter into dyamic contracts that can potentially last forever, but are subject to optimal terminations. Upon a termination, the firm hires a new worker, and the worker who is terminated receives a termination compensation from the firm and is then free to go back to the labor market to seek new employment opportunities and enter into new dynamic contracts. The model permits only two types of equilibrium terminations ...

  11. Marine Corps Contract Supply Model for High Quality Male Enlistment Contracts at the Recruiting Sub Station Level

    National Research Council Canada - National Science Library

    Welsh, Brian K

    2008-01-01

    .... This research develops contract production models at the Recruiting Sub Station level to estimate the effects of local economic conditions, demographics, and recruiting resources on new high quality...

  12. Beyond altruistic and commercial contract motherhood: the professional model.

    Science.gov (United States)

    Van Zyl, Liezl; Walker, Ruth

    2013-09-01

    It has become common to distinguish between altruistic and commercial contract motherhood (or 'surrogacy'). Altruistic arrangements are based on the 'gift relationship': a woman is motivated by altruism to have a baby for an infertile couple, who are free to reciprocate as they see fit. By contrast, in commercial arrangements both parties are motivated by personal gain to enter a legally enforceable agreement, which stipulates that the contract mother or 'surrogate' is to bear a child for the intending parents in exchange for a fee. She is required to undergo medical examinations and to refrain from behaviour that could harm the foetus. The intending parents are the child's legal parents from the outset. The parties to the contract can, but are not expected to, maintain contact after the transaction is completed. We argue that contract motherhood should not be organized according to the norms of the gift relationship, and that contract mothers should be compensated for their labour. However, we accept that there are good reasons for rejecting the commercial model as a suitable framework for contract pregnancy, and argue, instead, in favour of viewing it as a profession. © 2012 John Wiley & Sons Ltd.

  13. A SIMULATION OF CONTRACT FARMING USING AGENT BASED MODELING

    Directory of Open Access Journals (Sweden)

    Yuanita Handayati

    2016-12-01

    Full Text Available This study aims to simulate the effects of contract farming and farmer commitment to contract farming on supply chain performance by using agent based modeling as a methodology. Supply chain performance is represented by profits and service levels. The simulation results indicate that farmers should pay attention to customer requirements and plan their agricultural activities in order to fulfill these requirements. Contract farming helps farmers deal with demand and price uncertainties. We also find that farmer commitment is crucial to fulfilling contract requirements. This study contributes to this field from a conceptual as well as a practical point of view. From the conceptual point of view, our simulation results show that different levels of farmer commitment have an impact on farmer performance when implementing contract farming. From a practical point of view, the uncertainty faced by farmers and the market can be managed by implementing cultivation and harvesting scheduling, information sharing, and collective learning as ways of committing to contract farming.

  14. SoS contract verification using statistical model checking

    Directory of Open Access Journals (Sweden)

    Alessandro Mignogna

    2013-11-01

    Full Text Available Exhaustive formal verification for systems of systems (SoS is impractical and cannot be applied on a large scale. In this paper we propose to use statistical model checking for efficient verification of SoS. We address three relevant aspects for systems of systems: 1 the model of the SoS, which includes stochastic aspects; 2 the formalization of the SoS requirements in the form of contracts; 3 the tool-chain to support statistical model checking for SoS. We adapt the SMC technique for application to heterogeneous SoS. We extend the UPDM/SysML specification language to express the SoS requirements that the implemented strategies over the SoS must satisfy. The requirements are specified with a new contract language specifically designed for SoS, targeting a high-level English- pattern language, but relying on an accurate semantics given by the standard temporal logics. The contracts are verified against the UPDM/SysML specification using the Statistical Model Checker (SMC PLASMA combined with the simulation engine DESYRE, which integrates heterogeneous behavioral models through the functional mock-up interface (FMI standard. The tool-chain allows computing an estimation of the satisfiability of the contracts by the SoS. The results help the system architect to trade-off different solutions to guide the evolution of the SoS.

  15. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  16. A Game-Theoretic Model for Distributed Programming by Contract

    DEFF Research Database (Denmark)

    Henriksen, Anders Starcke; Hvitved, Tom; Filinski, Andrzej

    2009-01-01

    We present an extension of the programming-by-contract (PBC) paradigm to a concurrent and distributed environment.  Classical PBC is characterized by absolute conformance of code to its specification, assigning blame in case of failures, and a hierarchical, cooperative decomposition model – none...

  17. Multiscale forward electromagnetic model of uterine contractions during pregnancy

    International Nuclear Information System (INIS)

    La Rosa, Patricio S; Eswaran, Hari; Preissl, Hubert; Nehorai, Arye

    2012-01-01

    Analyzing and monitoring uterine contractions during pregnancy is relevant to the field of reproductive health assessment. Its clinical importance is grounded in the need to reliably predict the onset of labor at term and pre-term. Preterm births can cause health problems or even be fatal for the fetus. Currently, there are no objective methods for consistently predicting the onset of labor based on sensing of the mechanical or electrophysiological aspects of uterine contractions. Therefore, modeling uterine contractions could help to better interpret such measurements and to develop more accurate methods for predicting labor. In this work, we develop a multiscale forward electromagnetic model of myometrial contractions during pregnancy. In particular, we introduce a model of myometrial current source densities and compute its magnetic field and action potential at the abdominal surface, using Maxwell’s equations and a four-compartment volume conductor geometry. To model the current source density at the myometrium we use a bidomain approach. We consider a modified version of the Fitzhugh-Nagumo (FHN) equation for modeling ionic currents in each myocyte, assuming a plateau-type transmembrane potential, and we incorporate the anisotropic nature of the uterus by designing conductivity-tensor fields. We illustrate our modeling approach considering a spherical uterus and one pacemaker located in the fundus. We obtained a travelling transmembrane potential depolarizing from −56 mV to −16 mV and an average potential in the plateau area of −25 mV with a duration, before hyperpolarization, of 35 s, which is a good approximation with respect to the average recorded transmembrane potentials at term reported in the technical literature. Similarly, the percentage of myometrial cells contracting as a function of time had the same symmetric properties and duration as the intrauterine pressure waveforms of a pregnant human myometrium at term. We introduced a multiscale

  18. Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model

    Directory of Open Access Journals (Sweden)

    Lei Shi

    2018-01-01

    Full Text Available This study analyses the contractual efficiency of public-private partnership (PPP infrastructure projects, with a focus on two financial aspects: the nonrecourse principal and incompleteness of debt contracts. The nonrecourse principal releases the sponsoring companies from the debt contract when the special purpose vehicle (SPV established by the sponsoring companies falls into default. Consequently, all obligations under the debt contract are limited to the liability of the SPV following its default. Because the debt contract is incomplete, a renegotiation of an additional loan between the bank and the SPV might occur to enable project continuation or liquidation, which in turn influences the SPV’s ex ante strategies (moral hazard. Considering these two financial features of PPP infrastructure projects, this study develops an incomplete contract model to investigate how the renegotiation triggers ex ante moral hazard and ex post inefficient liquidation. We derive equilibrium strategies under service fees endogenously determined via bidding and examine the effect of equilibrium strategies on contractual efficiency. Finally, we propose an optimal combination of a performance guarantee, the government’s termination right, and a service fee to improve the contractual efficiency of PPP infrastructure projects.

  19. On the application of copula in modeling maintenance contract

    International Nuclear Information System (INIS)

    Iskandar, B P; Husniah, H

    2016-01-01

    This paper deals with the application of copula in maintenance contracts for a nonrepayable item. Failures of the item are modeled using a two dimensional approach where age and usage of the item and this requires a bi-variate distribution to modelling failures. When the item fails then corrective maintenance (CM) is minimally repaired. CM can be outsourced to an external agent or done in house. The decision problem for the owner is to find the maximum total profit whilst for the agent is to determine the optimal price of the contract. We obtain the mathematical models of the decision problems for the owner as well as the agent using a Nash game theory formulation. (paper)

  20. Improved Cell Culture Method for Growing Contracting Skeletal Muscle Models

    Science.gov (United States)

    Marquette, Michele L.; Sognier, Marguerite A.

    2013-01-01

    An improved method for culturing immature muscle cells (myoblasts) into a mature skeletal muscle overcomes some of the notable limitations of prior culture methods. The development of the method is a major advance in tissue engineering in that, for the first time, a cell-based model spontaneously fuses and differentiates into masses of highly aligned, contracting myotubes. This method enables (1) the construction of improved two-dimensional (monolayer) skeletal muscle test beds; (2) development of contracting three-dimensional tissue models; and (3) improved transplantable tissues for biomedical and regenerative medicine applications. With adaptation, this method also offers potential application for production of other tissue types (i.e., bone and cardiac) from corresponding precursor cells.

  1. A modelling approach for exploring muscle dynamics during cyclic contractions.

    Directory of Open Access Journals (Sweden)

    Stephanie A Ross

    2018-04-01

    Full Text Available Hill-type muscle models are widely used within the field of biomechanics to predict and understand muscle behaviour, and are often essential where muscle forces cannot be directly measured. However, these models have limited accuracy, particularly during cyclic contractions at the submaximal levels of activation that typically occur during locomotion. To address this issue, recent studies have incorporated effects into Hill-type models that are oftentimes neglected, such as size-dependent, history-dependent, and activation-dependent effects. However, the contribution of these effects on muscle performance has yet to be evaluated under common contractile conditions that reflect the range of activations, strains, and strain rates that occur in vivo. The purpose of this study was to develop a modelling framework to evaluate modifications to Hill-type muscle models when they contract in cyclic loops that are typical of locomotor muscle function. Here we present a modelling framework composed of a damped harmonic oscillator in series with a Hill-type muscle actuator that consists of a contractile element and parallel elastic element. The intrinsic force-length and force-velocity properties are described using Bézier curves where we present a system to relate physiological parameters to the control points for these curves. The muscle-oscillator system can be geometrically scaled while preserving dynamic and kinematic similarity to investigate the muscle size effects while controlling for the dynamics of the harmonic oscillator. The model is driven by time-varying muscle activations that cause the muscle to cyclically contract and drive the dynamics of the harmonic oscillator. Thus, this framework provides a platform to test current and future Hill-type model formulations and explore factors affecting muscle performance in muscles of different sizes under a range of cyclic contractile conditions.

  2. Analyzing the profit-loss sharing contracts with Markov model

    Directory of Open Access Journals (Sweden)

    Imam Wahyudi

    2016-12-01

    Full Text Available The purpose of this paper is to examine how to use first order Markov chain to build a reliable monitoring system for the profit-loss sharing based contracts (PLS as the mode of financing contracts in Islamic bank with censored continuous-time observations. The paper adopts the longitudinal analysis with the first order Markov chain framework. Laplace transform was used with homogenous continuous time assumption, from discretized generator matrix, to generate the transition matrix. Various metrics, i.e.: eigenvalue and eigenvector were used to test the first order Markov chain assumption. Cox semi parametric model was used also to analyze the momentum and waiting time effect as non-Markov behavior. The result shows that first order Markov chain is powerful as a monitoring tool for Islamic banks. We find that waiting time negatively affected present rating downgrade (upgrade significantly. Likewise, momentum covariate showed negative effect. Finally, the result confirms that different origin rating have different movement behavior. The paper explores the potential of Markov chain framework as a risk management tool for Islamic banks. It provides valuable insight and integrative model for banks to manage their borrower accounts. This model can be developed to be a powerful early warning system to identify which borrower needs to be monitored intensively. Ultimately, this model could potentially increase the efficiency, productivity and competitiveness of Islamic banks in Indonesia. The analysis used only rating data. Further study should be able to give additional information about the determinant factors of rating movement of the borrowers by incorporating various factors such as contract-related factors, bank-related factors, borrower-related factors and macroeconomic factors.

  3. Psychological Contract Development: An Integration of Existing Knowledge to Form a Temporal Model

    Directory of Open Access Journals (Sweden)

    Kelly Windle

    2014-07-01

    Full Text Available The psychological contract has received substantial theoretical attention over the past two decades as a popular framework within which to examine contemporary employment relationships. Previous research mostly examines breach and violation of the psychological contract and its impact on employee organization outcomes. Few studies have employed longitudinal, prospective research designs to investigate the psychological contract and as a result, psychological contract content and formation are incompletely understood. It is argued that employment relationships may be better proactively managed with greater understanding of formation and changes in the psychological contract. We examine existing psychological contract literature to identify five key factors proposed to contribute to the formation of psychological contracts. We extend the current research by integrating these factors for the first time into a temporal model of psychological contract development.

  4. Erosion Modeling of the High Contraction Chromium Plated Crusader Gun System

    National Research Council Canada - National Science Library

    Sopok, S

    2003-01-01

    Thermal-chemical- mechanical erosion modeling predictions are given for the high contraction chromium plated Crusader gun system based on extensive cannon firing, inspection, characterization, and experimental data...

  5. A Manpower Model for U.S. Navy Operational Contracting

    Science.gov (United States)

    2012-06-01

    CLC 056 Analyzing Contract Costs CLC 057 Performance Based Payments and Value of Cash Flow HBS 428 Negotiating Education At least 24...MONTHLY METRICS 38 The heads of contracting at the seven FLCs are responsible for maintaining all of the “ dashboard ” metrics. NAVSUP GLS headquarters

  6. Game-Theoretic Models for Usage-based Maintenance Contract

    Science.gov (United States)

    Husniah, H.; Wangsaputra, R.; Cakravastia, A.; Iskandar, B. P.

    2018-03-01

    A usage-based maintenance contracts with coordination and non coordination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers service contract to the owner of the truck after warranty ends. This contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the owner will be charged an additional cost. In general, the agent (Original Equipment Manufacturer/OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. The decision problem for the owner is to select the best option offered that fits to its requirement, and the decision problem for the agent is to find the optimal maintenance efforts for a given price of the service option offered. We first find the optimal decisions using coordination scheme and then with non coordination scheme for both parties.

  7. Electrical stimulation induces propagated colonic contractions in an experimental model.

    Science.gov (United States)

    Aellen, S; Wiesel, P H; Gardaz, J-P; Schlageter, V; Bertschi, M; Virag, N; Givel, J-C

    2009-02-01

    Direct colonic electrical stimulation may prove to be a treatment option for specific motility disorders such as chronic constipation. The aim of this study was to provoke colonic contractions using electrical stimulation delivered from a battery-operated device. Electrodes were inserted into the caecal seromuscular layer of eight anaesthetized pigs. Contractions were induced by a neurostimulator (Medtronic 3625). Caecal motility was measured simultaneously by video image analysis, manometry and a technique assessing colonic transit. Caecal contractions were generated using 8-10 V amplitude, 1000 micros pulse width, 120 Hz frequency for 10-30 s, with an intensity of 7-15 mA. The maximal contraction strength was observed after 20-25 s. Electrical stimulation was followed by a relaxation phase of 1.5-2 min during which contractions propagated orally and aborally over at least 10 cm. Spontaneous and stimulated caecal motility values were significantly different for both intraluminal pressure (mean(s.d.) 332(124) and 463(187) mmHg respectively; P < 0.001, 42 experiments) and movement of contents (1.6(0.9) and 3.9(2.8) mm; P < 0.001, 40 experiments). Electrical stimulation modulated caecal motility, and provoked localized and propagated colonic contractions.

  8. Strategic forward contracting in electricity markets: modelling and analysis by equilibrium method

    International Nuclear Information System (INIS)

    Chung, T.S.; Zhang, S.H.; Wong, K.P.; Yu, C.W.; Chung, C.Y.

    2004-01-01

    Contractual arrangement plays an important role in mitigating market power in electricity markets. The issue of whether rational generators would voluntarily enter contract markets through a strategic incentive is examined, and the factors which could affect this strategic contracting behaviour. A two-stage game model is presented to formulate the competition of generators in bid-based pool spot markets and contract markets, as well as the interaction between these two markets. The affine supply function equilibrium (SFE) method is used to model competitive bidding for the spot market, while the contract market is modelled with the general conjectural variation method. The proposed methodology allows asymmetric, multiple strategic generators having capacity constraints and affine marginal costs with non-zero intercepts to be taken into account. It is shown that the presence of forward contract markets will complicate the solution to the affine SFE, and a new methodology is developed in this regard. Strategic contracting behaviours are analysed in the context of asymmetric, multiple strategic generators. A numerical example is used to verify theoretical results. It is shown that the observability of contract markets plays an important role in fostering generators' strategic contracting incentive, and that this contracting behaviour could also be affected by generators' cost parameters and demand elasticity. (author)

  9. An optimization modeling approach to awarding large fire support wildfire helicopter contracts from the US Forest Service

    Science.gov (United States)

    Stephanie A. Snyder; Keith D. Stockmann; Gaylord E. Morris

    2012-01-01

    The US Forest Service used contracted helicopter services as part of its wildfire suppression strategy. An optimization decision-modeling system was developed to assist in the contract selection process. Three contract award selection criteria were considered: cost per pound of delivered water, total contract cost, and quality ratings of the aircraft and vendors....

  10. Modelling agri-environmental contracting of Dutch dairy farms: the role of manure policies and lock-in

    NARCIS (Netherlands)

    Peerlings, J.H.M.; Polman, N.B.P.

    2008-01-01

    The paper examines the possibility of lock-in on the area contracted under an agri-environmental contract in Dutch dairy farming, using a mathematical programming model, and the interaction of these contracts with Dutch national manure policy. Stricter manure policies increase contract

  11. Numerical modelling of air flow attributes in a contractions chamber

    Czech Academy of Sciences Publication Activity Database

    Michalcová, V.; Kuznetsov, Sergeii; Pospíšil, Stanislav

    2014-01-01

    Roč. 14, č. 2 (2014), s. 11-16 ISSN 1804-4824 R&D Projects: GA ČR(CZ) GA14-12892S; GA MŠk(CZ) LO1219 Keywords : aerodynamics * wind tunnel contraction * CFD Subject RIV: JN - Civil Engineering http://www.degruyter.com/view/j/tvsb.2014.14.issue-2/tvsb-2014-0026/tvsb-2014-0026. xml ?format=INT

  12. Modeling Psychological Contract Violation using Dual Regime Models: An Event-based Approach.

    Science.gov (United States)

    Hofmans, Joeri

    2017-01-01

    A good understanding of the dynamics of psychological contract violation requires theories, research methods and statistical models that explicitly recognize that violation feelings follow from an event that violates one's acceptance limits, after which interpretative processes are set into motion, determining the intensity of these violation feelings. Whereas theories-in the form of the dynamic model of the psychological contract-and research methods-in the form of daily diary research and experience sampling research-are available by now, the statistical tools to model such a two-stage process are still lacking. The aim of the present paper is to fill this gap in the literature by introducing two statistical models-the Zero-Inflated model and the Hurdle model-that closely mimic the theoretical process underlying the elicitation violation feelings via two model components: a binary distribution that models whether violation has occurred or not, and a count distribution that models how severe the negative impact is. Moreover, covariates can be included for both model components separately, which yields insight into their unique and shared antecedents. By doing this, the present paper offers a methodological-substantive synergy, showing how sophisticated methodology can be used to examine an important substantive issue.

  13. Evaluation model based on FAHP for nuclear power project contract performance

    International Nuclear Information System (INIS)

    Liu Bohang; Cheng Jing

    2012-01-01

    Fuzzy Comprehensive Evaluation is a common tool to analyze comprehensive integration. Fuzzy Analytic Hierarchy Process is an improvement for Analytic Hierarchy Process. Firstly the paper pointed out the concept of FAHP, and then used FAHP to setup an evaluation system model for nuclear power project contract performance. Based on this model, all the evaluation factors were assigned to different weightiness. By weighting the score of each factor, output would be the result which could evaluate the contract performance. On the basis of the research, the paper gave the principle of evaluating contract performance of nuclear power suppliers, which can assure the procurement process. (authors)

  14. Molecular modeling of the human eukaryotic translation initiation factor 5A (eIF5A) based on spectroscopic and computational analyses

    International Nuclear Information System (INIS)

    Costa-Neto, Claudio M.; Parreiras-e-Silva, Lucas T.; Ruller, Roberto; Oliveira, Eduardo B.; Miranda, Antonio; Oliveira, Laerte; Ward, Richard J.

    2006-01-01

    The eukaryotic translation initiation factor 5A (eIF5A) is a protein ubiquitously present in archaea and eukarya, which undergoes a unique two-step post-translational modification called hypusination. Several studies have shown that hypusination is essential for a variety of functional roles for eIF5A, including cell proliferation and synthesis of proteins involved in cell cycle control. Up to now neither a totally selective inhibitor of hypusination nor an inhibitor capable of directly binding to eIF5A has been reported in the literature. The discovery of such an inhibitor might be achieved by computer-aided drug design based on the 3D structure of the human eIF5A. In this study, we present a molecular model for the human eIF5A protein based on the crystal structure of the eIF5A from Leishmania brasiliensis, and compare the modeled conformation of the loop bearing the hypusination site with circular dichroism data obtained with a synthetic peptide of this loop. Furthermore, analysis of amino acid variability between different human eIF5A isoforms revealed peculiar structural characteristics that are of functional relevance

  15. A novel three-filament model of force generation in eccentric contraction of skeletal muscles.

    Directory of Open Access Journals (Sweden)

    Gudrun Schappacher-Tilp

    Full Text Available We propose and examine a three filament model of skeletal muscle force generation, thereby extending classical cross-bridge models by involving titin-actin interaction upon active force production. In regions with optimal actin-myosin overlap, the model does not alter energy and force predictions of cross-bridge models for isometric contractions. However, in contrast to cross-bridge models, the three filament model accurately predicts history-dependent force generation in half sarcomeres for eccentric and concentric contractions, and predicts the activation-dependent forces for stretches beyond actin-myosin filament overlap.

  16. The Inbodied5: a provisional Wellbeing model for Users and Interactive Technology Designers

    OpenAIRE

    schraefel, m.c.

    2013-01-01

    Most of us have weak models of wellbeing. This lack of an effective practical model of wellbeing, may be a strong factor for why health and wellbeing apps have had only mixed success. To help address this lack, we propose the inbodied5, a holistic model that represents five fundamental inter-related processes – eating, moving, cogitating, engaging and sleeping - to help designers and users debug our wellbeing towards better wellbeing self-efficacy.

  17. Characterization of an acute muscle contraction model using cultured C2C12 myotubes.

    Directory of Open Access Journals (Sweden)

    Yasuko Manabe

    Full Text Available A cultured C2C12 myotube contraction system was examined for application as a model for acute contraction-induced phenotypes of skeletal muscle. C2C12 myotubes seeded into 4-well rectangular plates were placed in a contraction system equipped with a carbon electrode at each end. The myotubes were stimulated with electric pulses of 50 V at 1 Hz for 3 ms at 997-ms intervals. Approximately 80% of the myotubes were observed to contract microscopically, and the contractions lasted for at least 3 h with electrical stimulation. Calcium ion (Ca²⁺ transient evoked by the electric pulses was detected fluorescently with Fluo-8. Phosphorylation of protein kinase B/Akt (Akt, 5' AMP-activated protein kinase (AMPK, p38 mitogen-activated protein kinase (p38, and c-Jun NH2-terminal kinase (JNK1/2, which are intracellular signaling proteins typically activated in exercised/contracted skeletal muscle, was observed in the electrically stimulated C2C12 myotubes. The contractions induced by the electric pulses increased glucose uptake and depleted glycogen in the C2C12 myotubes. C2C12 myotubes that differentiated after exogenous gene transfection by a lipofection or an electroporation method retained their normal contractile ability by electrical stimulation. These findings show that our C2C12 cell contraction system reproduces the muscle phenotypes that arise invivo (exercise, in situ (hindlimb muscles in an anesthetized animal, and invitro (dissected muscle tissues in incubation buffer by acute muscle contraction, demonstrating that the system is applicable for the analysis of intracellular events evoked by acute muscle contraction.

  18. Extended warranties, maintenance service and lease contracts modeling and analysis for decision-making

    CERN Document Server

    Murthy, D N Prabhakar

    2014-01-01

    Serving to unify the existing literature on extended warranties, maintenance service contracts and lease contracts, this book also presents a unique perspective on the topic focussed on cost analysis and decision-making from the perspectives of the parties involved. Using a game theoretic approach together with mathematical modelling, results are presented in an integrated manner with key topics that require further research highlighted in order to serve as a starting point for researchers (engineers and statisticians) who are interested in doing further work in these areas. Designed to assist practitioners (managers, engineers, applied statisticians) who are involved with extended warranties, maintenance service contracts and lease contracts, the book provides them with the models and techniques needed for proper cost analysis and effective decision-making. The book is also suitable for use as a reference text in industrial engineering, applied statistics, operations research and management.

  19. Are Emotions Transmitted From Work to Family? A Crossover Model of Psychological Contract Breach.

    Science.gov (United States)

    Liang, Huai-Liang

    2018-01-01

    Based on affective events theory and the crossover model, this study examines the effect of psychological contract breach on employee dysfunctional behavior and partner family undermining and explores the crossover effect of employee dysfunctional behavior on partner family undermining in work-family issues. This study collected 370 employee-partner dyads (277 male employees, 93 female employees, M age = 43.59 years) from a large manufacturing organization. The results of this study support the conception that employees' psychological contract breach results in frustration in the workplace. In addition, mediation analysis results reveal that psychological contract breach relates to employee dysfunctional behavior in the workplace. The findings show that partners' psychological strain mediates the relationship between employee dysfunctional behavior and partner family undermining. Furthermore, these findings provide investigations for the crossover model to display the value of psychological contract breach in family issues.

  20. Formal verification of smart contracts based on users and blockchain behaviors models

    OpenAIRE

    Abdellatif , Tesnim; Brousmiche , Kei-Léo

    2018-01-01

    International audience; Blockchain technology has attracted increasing attention in recent years. One reason for this new trend is the introduction of on-chain smart contracts enabling the implementation of decentralized applications in trust-less environments. Along with its adoption, attacks exploiting smart contract vul-nerabilities are inevitably growing. To counter these attacks and avoid breaches, several approaches have been explored such as documenting vulnerabilities or model checkin...

  1. An Uncertain Wage Contract Model with Adverse Selection and Moral Hazard

    Directory of Open Access Journals (Sweden)

    Xiulan Wang

    2014-01-01

    it can be characterized as an uncertain variable. Moreover, the employee's effort is unobservable to the employer, and the employee can select her effort level to maximize her utility. Thus, an uncertain wage contract model with adverse selection and moral hazard is established to maximize the employer's expected profit. And the model analysis mainly focuses on the equivalent form of the proposed wage contract model and the optimal solution to this form. The optimal solution indicates that both the employee's effort level and the wage increase with the employee's ability. Lastly, a numerical example is given to illustrate the effectiveness of the proposed model.

  2. Revenue-Sharing Contract Models for Logistics Service Supply Chains with Mass Customization Service

    Directory of Open Access Journals (Sweden)

    Weihua Liu

    2015-01-01

    Full Text Available The revenue-sharing contract is one of the most important supply chain coordination contracts; it has been applied in various supply chains. However, studies related to service supply chains with mass customization (MC are lacking. Considering the equity of benefit distribution between the members of service supply chains, in this paper, we designed two revenue-sharing contracts. The first contract for the maximum equity of a single logistics service integrator (LSI and single functional logistics service provider (FLSP in a two-echelon logistics service supply chain was designed by introducing the fair entropy function (“one to one” model. Furthermore, the method is extended to a more complex supply chain, which consists of a single LSI and multiple FLSPs. A new contract was designed not only for considering the equity of an LSI and each FLSP but also for the equity between each FLSP (“one to N” model. The “one to one” model in three-echelon LSSC is also provided. The result exemplifies that, whether in the “one to one” model or “one to N” model, there exists a best interval of customized level when the revenue-sharing coefficient reaches its maximum.

  3. Contract formation and mistake in European contract law : a genetic comparison of transnational model rules / Nils Jansen, Reinhard Zimmermann

    Index Scriptorium Estoniae

    Jansen, Nils

    2011-01-01

    Euroopa lepinguõiguse normide analüüs ja võrdlus. PECL - The Principles of European Cntract Law ; CISG - United Nations Convention on Contracts for the International Sale of Goods ; DCFR - Draft Common Frame of Reference ; UNIDROIT - Principles of International Commercial Contracts

  4. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  5. On the existence of optimal contract mechanisms for incomplete information principal-agent models

    NARCIS (Netherlands)

    Balder, E.J.

    1997-01-01

    Two abstract results are given for the existence of optimal contract selection mechanisms in principal-agent models; by a suitable reformulation of the (almost) incentive compatibility constraint, they deal with both single- and multi-agent models. In particular, it is shown that the existence

  6. Gauge Group Contraction of Electroweak Model and its Natural Energy Limits

    Directory of Open Access Journals (Sweden)

    Nikolai A. Gromov

    2015-09-01

    Full Text Available The low and higher energy limits of the Electroweak Model are obtained from first principles of gauge theory. Both limits are given by the same contraction of the gauge group, but for the different consistent rescalings of the field space. Mathematical contraction parameter in both cases is interpreted as energy. The very weak neutrino-matter interaction is explained by zero tending contraction parameter, which depends on neutrino energy. The second consistent rescaling corresponds to the higher energy limit of the Electroweak Model. At the infinite energy all particles lose masses, electroweak interactions become long-range and are mediated by the neutral currents. The limit model represents the development of the early Universe from the Big Bang up to the end of the first second.

  7. Natural limits of electroweak model as contraction of its gauge group

    International Nuclear Information System (INIS)

    Gromov, N A

    2015-01-01

    The low and higher energy limits of the electroweak model are obtained from the first principles of gauge theory. Both limits are given by the same contraction of the gauge group, but for the different consistent rescalings of the field space. Mathematical contraction parameter in both cases is interpreted as energy. Very weak neutrino–matter interactions are explained by zero tending contraction parameter, which depends on neutrino energy. The second consistent rescaling corresponds to the higher energy limit of the electroweak model. At the infinite energy all particles lose mass, electroweak interactions become long-range and are mediated by neutral currents. The limit model represents the development of the early Universe from the big bang up to the end of the first second. (paper)

  8. Modeling Psychological Contract Violation using Dual Regime Models: An Event-based Approach

    Directory of Open Access Journals (Sweden)

    Joeri Hofmans

    2017-11-01

    Full Text Available A good understanding of the dynamics of psychological contract violation requires theories, research methods and statistical models that explicitly recognize that violation feelings follow from an event that violates one's acceptance limits, after which interpretative processes are set into motion, determining the intensity of these violation feelings. Whereas theories—in the form of the dynamic model of the psychological contract—and research methods—in the form of daily diary research and experience sampling research—are available by now, the statistical tools to model such a two-stage process are still lacking. The aim of the present paper is to fill this gap in the literature by introducing two statistical models—the Zero-Inflated model and the Hurdle model—that closely mimic the theoretical process underlying the elicitation violation feelings via two model components: a binary distribution that models whether violation has occurred or not, and a count distribution that models how severe the negative impact is. Moreover, covariates can be included for both model components separately, which yields insight into their unique and shared antecedents. By doing this, the present paper offers a methodological-substantive synergy, showing how sophisticated methodology can be used to examine an important substantive issue.

  9. The psychological contract: is the UK National Health Service a model employer?

    Science.gov (United States)

    Fielden, Sandra; Whiting, Fiona

    2007-05-01

    The UK National Health Service (NHS) is facing recruitment challenges that mean it will need to become an 'employer of choice' if it is to continue to attract high-quality employees. This paper reports the findings from a study focusing on allied health professional staff (n = 67), aimed at establishing the expectations of the NHS inherent in their current psychological contract and to consider whether the government's drive to make the NHS a model employer meets those expectations. The findings show that the most important aspects of the psychological contract were relational and based on the investment made in the employment relationship by both parties. The employment relationship was one of high involvement but also one where transactional contract items, such as pay, were still of some importance. Although the degree of employee satisfaction with the relational content of the psychological contract was relatively positive, there was, nevertheless, a mismatch between levels of importance placed on such aspects of the contract and levels of satisfaction, with employees increasingly placing greater emphasis on those items the NHS is having the greatest difficulty providing. Despite this apparent disparity between employee expectation and the fulfilment of those expectations, the overall health of the psychological contract was still high.

  10. Basic Conditions of Validity of Electronic Contracts in Iran and UNCITRAL Model Law

    Directory of Open Access Journals (Sweden)

    Abbas Karimi

    2017-02-01

    Full Text Available Diverse activities such as electronic exchange of goods and services, instant digital content delivery, electronic funds transfer, electronic stock exchange, electronic bill of lading, commercial projects, common engineering and design, sourcing, government purchase, direct marketing and post-sales services included in e-commerce field.  Due to the increasing spread of the electronic world in all aspects, electronic contracts, in turn, was of great importance and made significant contributions in business contracts. The present study aims to investigate the concept, fundamentals and history of electronic contracts referring to UNCITRAL Model Law on Electronic Commerce and Electronic Commerce Act (1996. The results indicate that in terms of the conclusion and obligations of the parties, contract in cyberspace in general is similar to the contract in the real world and in this respect, there is no major difference between these two contexts. Potential electronic contracts considered as written ones and Electronic signatures recognized as valid as the basis of the validity of the will in electronic trading.

  11. Modeling commodity salam contract between two parties for discrete and continuous time series

    Science.gov (United States)

    Hisham, Azie Farhani Badrol; Jaffar, Maheran Mohd

    2017-08-01

    In order for Islamic finance to remain competitive as the conventional, there needs a new development of Islamic compliance product such as Islamic derivative that can be used to manage the risk. However, under syariah principles and regulations, all financial instruments must not be conflicting with five syariah elements which are riba (interest paid), rishwah (corruption), gharar (uncertainty or unnecessary risk), maysir (speculation or gambling) and jahl (taking advantage of the counterparty's ignorance). This study has proposed a traditional Islamic contract namely salam that can be built as an Islamic derivative product. Although a lot of studies has been done on discussing and proposing the implementation of salam contract as the Islamic product however they are more into qualitative and law issues. Since there is lack of quantitative study of salam contract being developed, this study introduces mathematical models that can value the appropriate salam price for a commodity salam contract between two parties. In modeling the commodity salam contract, this study has modified the existing conventional derivative model and come out with some adjustments to comply with syariah rules and regulations. The cost of carry model has been chosen as the foundation to develop the commodity salam model between two parties for discrete and continuous time series. However, the conventional time value of money results from the concept of interest that is prohibited in Islam. Therefore, this study has adopted the idea of Islamic time value of money which is known as the positive time preference, in modeling the commodity salam contract between two parties for discrete and continuous time series.

  12. Trustless Machine Learning Contracts; Evaluating and Exchanging Machine Learning Models on the Ethereum Blockchain

    OpenAIRE

    Kurtulmus, A. Besir; Daniel, Kenny

    2018-01-01

    Using blockchain technology, it is possible to create contracts that offer a reward in exchange for a trained machine learning model for a particular data set. This would allow users to train machine learning models for a reward in a trustless manner. The smart contract will use the blockchain to automatically validate the solution, so there would be no debate about whether the solution was correct or not. Users who submit the solutions won't have counterparty risk that they won't get paid fo...

  13. CM5: A pre-Swarm magnetic field model based upon the comprehensive modeling approach

    DEFF Research Database (Denmark)

    Sabaka, T.; Olsen, Nils; Tyler, Robert

    2014-01-01

    We have developed a model based upon the very successful Comprehensive Modeling (CM) approach using recent CHAMP, Ørsted, SAC-C and observatory hourly-means data from September 2000 to the end of 2013. This CM, called CM5, was derived from the algorithm that will provide a consistent line of Leve...

  14. Modeling Magnetomyograms of Uterine Contractions during Pregnancy Using a Multiscale Forward Electromagnetic Approach.

    Directory of Open Access Journals (Sweden)

    Mengxue Zhang

    Full Text Available Understanding the mechanisms of uterine contractions during pregnancy is especially important in predicting the onset of labor and thus in forecasting preterm deliveries. Preterm birth can cause serious health problems in newborns, as well as large financial burdens to society. Various techniques such as electromyography (EMG and magnetomyography (MMG have been developed to quantify uterine contractions. However, no widely accepted method to predict labor based on electromagnetic measurement is available. Therefore, developing a biophysical model of EMG and MMG could help better understand uterine contractions, interpret real measurements, and detect labor. In this work, we propose a multiscale realistic model of uterine contractions during pregnancy. At the cellular level, building on bifurcation theory, we apply generalized FitzHugh-Nagumo (FHN equations that produces both plateau-type and bursting-type action potentials. At the tissue level, we introduce a random fiber orientation model applicable to an arbitrary uterine shape. We also develop an analytical expression for the propagation speed of transmembrane potential. At the organ level, a realistic volume conductor geometry model is provided based on magnetic resonance images of a pregnant woman. To simulate the measurements from the SQUID Array for Reproductive Assessment (SARA device, we propose a sensor array model. Our model is able to reproduce the characteristics of action potentials. Additionally, we investigate the sensitivity of MMG to model configuration aspects such as volume geometry, fiber orientation, and pacemaker location. Our numerical results show that fiber orientation and pacemaker location are the key aspects that greatly affect the MMG as measured by the SARA device. We conclude that sphere is appropriate as an approximation of the volume geometry. The initial step towards validating the model against real MMG measurement is also presented. Our results show that the

  15. Estimating Co-Contraction Activation of Trunk Muscles Using a Novel Musculoskeletal Model for Pregnant Women

    Directory of Open Access Journals (Sweden)

    Saori Morino

    2017-10-01

    Full Text Available Weight gain and stretched abdominal muscles from an enlarged gravid uterus are remarkable features during pregnancy. These changes elicit postural instability and place strain on body segments, contributing to lower back pain. In general, the agonist and antagonist muscles act simultaneously to increase joint stabilization; however, this can cause additional muscle stress during movement. Furthermore, this activation can be observed in pregnant women because of their unstable body joints. Hence, physical modalities based on assessments of muscle activation are useful for managing low back pain during pregnancy. Musculoskeletal models are common when investigating muscle load. However, it is difficult to apply such models to pregnant women and estimate the co-contraction of muscles using musculoskeletal models. Therefore, the purpose of this study is to construct a musculoskeletal model for pregnant women that estimates the co-contraction of trunk muscles. First, motion analysis was conducted on a pregnant woman and the muscle activations of the rectus abdominis and erector spinae were measured. Then, the musculoskeletal model was specifically modified for pregnant women. Finally, the co-contraction was estimated from the results of the musculoskeletal model and electromyography data using a genetic algorithm. With the proposed methods, weakened abdominal muscle torque and the co-contraction activation of trunk muscles were estimated successfully.

  16. Environmental Parametric Cost Model in Oil and Gas EPC Contracts

    Directory of Open Access Journals (Sweden)

    Madjid Abbaspour

    2018-01-01

    Full Text Available This study aims at identifying the parameters that govern the environmental costs in oil and gas projects. An initial conceptual model was proposed. Next, the costs of environmental management work packages were estimated, separately and were applied in project control tools (WBS/CBS. Then, an environmental parametric cost model was designed to determine the environmental costs and relevant weighting factors. The suggested model can be considered as an innovative approach to designate the environmental indicators in oil and gas projects. The validity of variables was investigated based on Delphi method. The results indicated that the project environmental management’s weighting factor is 0.87% of total project’s weighting factor.

  17. The Generalized Hill Model: A Kinematic Approach Towards Active Muscle Contraction

    Science.gov (United States)

    Menzel, Andreas; Kuhl, Ellen

    2014-01-01

    Excitation-contraction coupling is the physiological process of converting an electrical stimulus into a mechanical response. In muscle, the electrical stimulus is an action potential and the mechanical response is active contraction. The classical Hill model characterizes muscle contraction though one contractile element, activated by electrical excitation, and two non-linear springs, one in series and one in parallel. This rheology translates into an additive decomposition of the total stress into a passive and an active part. Here we supplement this additive decomposition of the stress by a multiplicative decomposition of the deformation gradient into a passive and an active part. We generalize the one-dimensional Hill model to the three-dimensional setting and constitutively define the passive stress as a function of the total deformation gradient and the active stress as a function of both the total deformation gradient and its active part. We show that this novel approach combines the features of both the classical stress-based Hill model and the recent active-strain models. While the notion of active stress is rather phenomenological in nature, active strain is micro-structurally motivated, physically measurable, and straightforward to calibrate. We demonstrate that our model is capable of simulating excitation-contraction coupling in cardiac muscle with its characteristic features of wall thickening, apical lift, and ventricular torsion. PMID:25221354

  18. Modeling the Interest Rate Term Structure: Derivatives Contracts Dynamics and Evaluation

    Directory of Open Access Journals (Sweden)

    Pedro L. Valls Pereira

    2005-06-01

    Full Text Available This article deals with a model for the term structure of interest rates and the valuation of derivative contracts directly dependent on it. The work is of a theoretical nature and deals, exclusively, with continuous time models, making ample use of stochastic calculus results and presents original contributions that we consider relevant to the development of the fixed income market modeling. We develop a new multifactorial model of the term structure of interest rates. The model is based on the decomposition of the yield curve into the factors level, slope, curvature, and the treatment of their collective dynamics. We show that this model may be applied to serve various objectives: analysis of bond price dynamics, valuation of derivative contracts and also market risk management and formulation of operational strategies which is presented in another article.

  19. Modelling Ca2+ bound Troponin in Excitation Contraction Coupling

    Directory of Open Access Journals (Sweden)

    Henry G. Zot

    2016-09-01

    Full Text Available To explain disparate decay rates of cytosolic Ca2+ and structural changes in the thin filaments during a twitch, we model the time course of Ca2+ bound troponin (Tn resulting from the free Ca2+ transient of fast skeletal muscle. In fibers stretched beyond overlap, the decay of Ca2+ as measured by a change in fluo 3 fluorescence is significantly slower than the intensity decay of the meridional 1/38.5 nm-1 reflection of Tn; this is not simply explained by considering only the Ca2+ binding properties of Tn alone (Matsuo, T., Iwamoto, H., and Yagi, N. (2010. Biophys. J. 99, 193-200. We apply a comprehensive model that includes the known Ca2+ binding properties of Tn in the context of the thin filament with and without cycling crossbridges. Calculations based on the model predict that the transient of Ca2+ bound Tn correlates with either the fluo 3 time course in muscle with overlapping thin and thick filaments or the intensity of the meridional 1/38.5 nm-1 reflection in overstretched muscle. Hence, cycling crossbridges delay the dissociation of Ca2+ from Tn. Correlation with the fluo 3 fluorescence change is not causal given that the transient of Ca2+ bound Tn depends on sarcomere length, whereas the fluo-3 fluorescence change does not. Transient positions of tropomyosin calculated from the time course of Ca2+ bound Tn are in reasonable agreement with the transient of measured perturbations of the Tn repeat in overlap and non-overlap muscle preparations.

  20. Fundamental study on interfacial area transport model (I) (contract research)

    International Nuclear Information System (INIS)

    Mishima, Kaichiro; Nakamura, Hideo

    2001-03-01

    Recently, improvement in the best-estimate (BE) code predictive capability is attempted by incorporating the interfacial area transport model (IATM) into a one-dimensional two-fluid model to represent gas-liquid two-phase flows in detail with less uncertainty in the flow predictions. Internationally, the nuclear regulatory commission (NRC) and Purdue University in the U.S.A. and CEA in France have promoted the renewal of their BE codes such as TRAC, RELAP5 and CATHARE, by introducing the IATM in cooperative manner. In Japan, JAERI is underway to develop a one-dimensional code based primarily on the IATM against the licensing procedures of next-generation nuclear reactors. The IATM has a possibility to correctly predict flow transient along flow path for such flows as developing flows, multi-dimensional flows, transitional flows, boiling flows, which are difficult to accurately predict by the two-fluid models employed in the current BE codes. The newly developed code with the IATM would dramatically improve the accuracy in the flow prediction. The model, however, is under development and needs great effort to overcome many difficulties with plenty of theoretical considerations based on much of data bases to be acquired further. This study attempts to measure interfacial area in air-water two-phase flows in a large-diameter tube to understand the characteristic of multi-dimensional flows that usually appear in large-diameter tube flows, and provide data bases, to contribute the development of the IATM. The results obtained by such institutes as Purdue University and CEA France were reviewed first. Clarified are the current status and problems of the IATM, basics and practical methods to measure the interfacial area using multi-sensor miniature local probes; metal needle electro-resistance probe and fiber-optic probe. It was found that the applicability of the IATM is limited mostly to a one-dimensional bubbly flow, and is far from satisfactory for multi

  1. Heterogeneous beliefs and routes to complex dynamics in asset pricing models with price contingent contracts

    NARCIS (Netherlands)

    Brock, W.A.; Hommes, C.H.

    2001-01-01

    This paper discusses dynamic evolutionary multi-agent systems, as introduced by Brock and Hommes (1997). In particular the heterogeneous agent dynamic asset pricing model of Brock and Hommes (1998) is extended by introducing derivative securities by means of price contingent contracts. Numerical

  2. Another Look at Helmholtz's Model for the Gravitational Contraction of the Sun

    Science.gov (United States)

    Tort, A. C.; Nogarol, F.

    2011-01-01

    We take another look at the Helmholtz model for the gravitational contraction of the Sun. We show that there are two other pedagogically useful ways of rederiving Helmholtz's main results that make use of Gauss's law, the concept of gravitational field energy and the work-kinetic energy theorem. An account of the energy balance involved in the…

  3. Promises from Afar: A Model of International Student Psychological Contract in Business Education

    Science.gov (United States)

    Bordia, Sarbari; Bordia, Prashant; Restubog, Simon Lloyd D.

    2015-01-01

    Despite their significant presence in western business schools, the needs and experiences of international students have not been adequately reflected in the business education literature. We draw upon psychological contract theory--used to understand employer-employee relationships--to develop a novel theoretical model on the international…

  4. Method of moments approach to pricing double barrier contracts in polynomial jump-diffusion models

    NARCIS (Netherlands)

    Eriksson, B.; Pistorius, M.

    2011-01-01

    Abstract: We present a method of moments approach to pricing double barrier contracts when the underlying is modelled by a polynomial jump-diffusion. By general principles the price is linked to certain infinite dimensional linear programming problems. Subsequently approximating these by finite

  5. The Optimal Licensing Contract in a Differentiated Stackelberg Model

    Directory of Open Access Journals (Sweden)

    Xianpei Hong

    2014-01-01

    Full Text Available This paper extends the work of Wang (2002 by considering a differentiated Stackelberg model, when the leader firm is an inside innovator and licenses its new technology by three options, that is, fixed-fee licensing, royalty licensing, and two-part tariff licensing. The main contributions and conclusions of this paper are threefold. First of all, this paper derives a very different result from Wang (2002. We show that, with a nondrastic innovation, royalty licensing is always better than fixed-fee licensing for the innovator; with a drastic innovation, royalty licensing is superior to fixed-fee licensing for small values of substitution coefficient d; however when d becomes closer to 1, neither fee nor royalty licensing will occur. Secondly, this paper shows that the innovator is always better off in case of two-part tariff licensing than fixed-fee licensing no matter what the innovation size is. Thirdly, the innovator always prefers to license its nondrastic innovation by means of a two-part tariff instead of licensing by means of a royalty; however, with a drastic innovation, the optimal licensing strategy can be either a two-part tariff or a royalty, depending upon the differentiation of the goods.

  6. The optimal licensing contract in a differentiated Stackelberg model.

    Science.gov (United States)

    Hong, Xianpei; Yang, Lijun; Zhang, Huaige; Zhao, Dan

    2014-01-01

    This paper extends the work of Wang (2002) by considering a differentiated Stackelberg model, when the leader firm is an inside innovator and licenses its new technology by three options, that is, fixed-fee licensing, royalty licensing, and two-part tariff licensing. The main contributions and conclusions of this paper are threefold. First of all, this paper derives a very different result from Wang (2002). We show that, with a nondrastic innovation, royalty licensing is always better than fixed-fee licensing for the innovator; with a drastic innovation, royalty licensing is superior to fixed-fee licensing for small values of substitution coefficient d; however when d becomes closer to 1, neither fee nor royalty licensing will occur. Secondly, this paper shows that the innovator is always better off in case of two-part tariff licensing than fixed-fee licensing no matter what the innovation size is. Thirdly, the innovator always prefers to license its nondrastic innovation by means of a two-part tariff instead of licensing by means of a royalty; however, with a drastic innovation, the optimal licensing strategy can be either a two-part tariff or a royalty, depending upon the differentiation of the goods.

  7. Venture financing of start-ups: A model of contract between VC fund and entrepreneur

    Directory of Open Access Journals (Sweden)

    Osintsev Yury

    2010-01-01

    Full Text Available Venture capital has become one of the main sources of innovation in the modern, global economy. It is not just a substitute for bank loans: it has proven to be a more efficient way of financing projects at different stages. On one hand, venture financing allows for projects with higher risk, which leads to the possibility of higher returns on investment. On the other hand, venture investors who usually have managerial experience often participate in governing the business, which certainly adds value to the enterprise. In this paper we establish the model of contract between the venture capital fund and the entrepreneur, focusing on probably the most important issue of this contract: the shares of the parties in the business. The shares in the company determine the distribution of the joint surplus. The expected joint profits are not just exogenously specified in the contract but are dependent on the behavioral variables of both parties at the stage of fulfilling the contract. We call the behavioral variable of the entrepreneur ‘effort’ and the one of the venture fund ‘advice’. The probability of the project’s success, and hence the expected joint revenues, are increased by these two. However, both kinds of effort are costly to the respective parties that have made them. Based on this fact we can elaborate the profit functions of both sides of the contract. Our model can be considered as a basis for specifying contracts concerning venture financing. It can provide the logic for how the equilibrium shares of entrepreneur and venture fund are obtained.

  8. Maintenance service contract model for heavy equipment in mining industry using principal agent theory

    Science.gov (United States)

    Pakpahan, Eka K. A.; Iskandar, Bermawi P.

    2015-12-01

    Mining industry is characterized by a high operational revenue, and hence high availability of heavy equipment used in mining industry is a critical factor to ensure the revenue target. To maintain high avaliability of the heavy equipment, the equipment's owner hires an agent to perform maintenance action. Contract is then used to control the relationship between the two parties involved. The traditional contracts such as fixed price, cost plus or penalty based contract studied is unable to push agent's performance to exceed target, and this in turn would lead to a sub-optimal result (revenue). This research deals with designing maintenance contract compensation schemes. The scheme should induce agent to select the highest possible maintenance effort level, thereby pushing agent's performance and achieve maximum utility for both parties involved. Principal agent theory is used as a modeling approach due to its ability to simultaneously modeled owner and agent decision making process. Compensation schemes considered in this research includes fixed price, cost sharing and revenue sharing. The optimal decision is obtained using a numerical method. The results show that if both parties are risk neutral, then there are infinite combination of fixed price, cost sharing and revenue sharing produced the same optimal solution. The combination of fixed price and cost sharing contract results in the optimal solution when the agent is risk averse, while the optimal combination of fixed price and revenue sharing contract is obtained when agent is risk averse. When both parties are risk averse, the optimal compensation scheme is a combination of fixed price, cost sharing and revenue sharing.

  9. Informed Principal Model and Contract in Supply Chain with Demand Disruption Asymmetric Information

    Directory of Open Access Journals (Sweden)

    Huan Zhang

    2016-01-01

    Full Text Available Because of the frequency and disastrous influence, the supply chain disruption has caused extensive concern both in the industry and in the academia. In a supply chain with one manufacturer and one retailer, the demand of the retailer is uncertain and meanwhile may suffer disruption with a probability. Taking the demand disruption probability as the retailer’s asymmetric information, an informed principal model with the retailer as the principal is explored to make the contract. The retailer can show its information to the manufacturer through the contract. It is found out that the high-risk retailer intends to pretend to be the low-risk one. So the separating contract is given through the low-information-intensity allocation, in which the order quantity and the transferring payment for the low-risk retailer distort upwards, but those of high-risk retailer do not distort. In order to reduce the signaling cost which the low-risk retailer pays, the interim efficient model is introduced, which ends up with the order quantity and transferring payment distorting upwards again but less than before. In the numerical examples, with two different mutation probabilities, the informed principal contracts show the application of the informed principal model in the supply chain with demand disruption.

  10. Modelling disassembled fuel bundles using CATHENA MOD-3.5a under LOCA/LOECC conditions

    Energy Technology Data Exchange (ETDEWEB)

    Lei, Q M; Sanderson, D B; Dutton, R [Atomic Energy of Canada Ltd., Pinawa, MB (Canada). Whiteshell Labs.

    1996-12-31

    CATHENA MOD-3.5a is a multipurpose thermalhydraulic computer code developed primarily to analyse postulated loss-of-coolant scenarios for CANDU nuclear reactors. The code contains a generalized heat transfer package that enables it to model the behaviour of a fuel channel in great detail. Throughout the development of the CATHENA code, considerable effort has been devoted to evaluating, validating and documenting its overall capability as a design and safety assessment tool. Specific attention has focused on its ability to predict fuel channel behaviour under postulated accident conditions. This paper describes an investigation of CATHENA`s ability to predict the thermal-chemical responses of a fuel channel in which the 37-element bundles were assumed to disassemble and rearrange into a closed-packed stack of elements at the bottom of the pressure tube. A representative disassembled bundle geometry was modelled during a simulated loss-of-coolant accident scenario using CATHENA MOD-3.5a/Rev 0, with superheated steam being the only coolant available. Thermal conduction in the radial and circumferential directions was calculated for individual fuel elements, the pressure tube, and the calandria tube. Radiation view factors for the intact and disassembled bundle geometries were calculated using a CATHENA utility program. Inter-element metal-to-metal contact was accounted for using the CATHENA solid-solid contact model. An offset pressure-tube configuration, representing a partially sagged pressure tube, and the effect of steam starvation on the exothermic zirconium-steam reaction, were included in the CATHENA model. The CATHENA-predicted results show a dramatic suppression of heat generation from the zirconium-steam reaction when bundle disassembly is initiated. The predicted results show a smaller temperature increase in the fuel sheaths and the pressure tube for the disassembled bundle geometry, compared to the temperature excursion for the intact bundle. (author

  11. The Structural Model of Psychological Contract Violation, Organizational Commitment, Turnover, Job Satisfaction and Deviant Behaviors

    Directory of Open Access Journals (Sweden)

    M. Golparvar

    2014-12-01

    Full Text Available This research was conducted with the purpose of studying the structural model of the relationships of psychological contract violation with organizational commitment, turnover, job satisfaction and deviant behaviors. Research method was correlation and the statistical population were male employees of an industrial company in Shiraz city, from among which 300 employees were selected using convenience sampling. Assessment instruments consisted of Psychological Contract Violation Questionnaire (Tekleab etal, 2005, Organizational Commitment Questionnaire (Speier & Vankatesh, 2002, Job Satisfaction Questionnaire (Spector, 1985, Turnover Questionnaire (Tekleab etal, 2005 and Deviant Behavior Questionnaire (Bennett & Robinson, 2000. Data was analyzed using Pearson’s correlation coefficient, structure equation modeling (SEM and mediation analysis. Findings showed that psychological contract violation explained 7.1 percent of organizational commitment variance, organizational commitment and job satisfaction explained 16.7 percent of turnover variance, organizational commitment explained 20.3 percent of job satisfaction variance and turnover explained 4.3 percent of deviant behavior variance. Mediation analysis showed that organizational commitment played the complete mediator variable in the relation of psychological contract violation with job satisfaction and job satisfaction was the partial mediator variable in the relation of organizational commitment with turnover. Finally with regard to the limitation of generalization of current research results it is suggested to industrial organizations that they should not violate their obligations to employees in anyway.

  12. Automatic and quantitative measurement of collagen gel contraction using model-guided segmentation

    Science.gov (United States)

    Chen, Hsin-Chen; Yang, Tai-Hua; Thoreson, Andrew R.; Zhao, Chunfeng; Amadio, Peter C.; Sun, Yung-Nien; Su, Fong-Chin; An, Kai-Nan

    2013-08-01

    Quantitative measurement of collagen gel contraction plays a critical role in the field of tissue engineering because it provides spatial-temporal assessment (e.g., changes of gel area and diameter during the contraction process) reflecting the cell behavior and tissue material properties. So far the assessment of collagen gels relies on manual segmentation, which is time-consuming and suffers from serious intra- and inter-observer variability. In this study, we propose an automatic method combining various image processing techniques to resolve these problems. The proposed method first detects the maximal feasible contraction range of circular references (e.g., culture dish) and avoids the interference of irrelevant objects in the given image. Then, a three-step color conversion strategy is applied to normalize and enhance the contrast between the gel and background. We subsequently introduce a deformable circular model which utilizes regional intensity contrast and circular shape constraint to locate the gel boundary. An adaptive weighting scheme was employed to coordinate the model behavior, so that the proposed system can overcome variations of gel boundary appearances at different contraction stages. Two measurements of collagen gels (i.e., area and diameter) can readily be obtained based on the segmentation results. Experimental results, including 120 gel images for accuracy validation, showed high agreement between the proposed method and manual segmentation with an average dice similarity coefficient larger than 0.95. The results also demonstrated obvious improvement in gel contours obtained by the proposed method over two popular, generic segmentation methods.

  13. A New Availability-Payment Model for Pricing Performance-Based Logistics Contracts

    Science.gov (United States)

    2014-05-01

    Grant number: N00244‐13‐1‐0009 A New “Availability‐ Payment ”  Model  for Pricing Performance‐ Based Logistics Contracts A. KashaniPour, X. Zhu, P...DATE MAY 2014 2. REPORT TYPE 3. DATES COVERED 00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE A New ’Availability‐ Payment ’ Model for...is how the  payment   model  in the contract  quantifies the contractor’s  performance for awarding incentives  or penalties Discrete‐Event Simulator ut

  14. [The Brazilian National Health Surveillance Agency performance evaluation at the management contract model].

    Science.gov (United States)

    Moreira, Elka Maltez de Miranda; Costa, Ediná Alves

    2010-11-01

    The Brazilian National Health Surveillance Agency (Anvisa) is supervised by the Ministry of Health by means of a management contract, a performance evaluation tool. This case study was aimed at describing and analyzing Anvisa's performance evaluation model based on the agency's institutional purpose, according to the following analytical categories: the management contract formalization, evaluation tools, evaluators and institutional performance. Semi-structured interviews and document analysis revealed that Anvisa signed only one management contract with the Ministry of Health in 1999, updated by four additive terms. The Collegiate Board of Directors and the Advisory Center for Strategic Management play the role of Anvisa's internal evaluators and an Assessing Committee, comprising the Ministry of Health, constitutes its external evaluator. Three phases were identified in the evaluation model: the structuring of the new management model (1999-2000), legitimation regarding the productive segment (2001-2004) and widespread legitimation (2005). The best performance was presented in 2000 (86.05%) and the worst in 2004 (40.00%). The evaluation model was shown to have contributed little towards the agency's institutional purpose and the effectiveness measurement of the implemented actions.

  15. Two dimensional numerical model for steam--water flow in a sudden contraction

    International Nuclear Information System (INIS)

    Crowe, C.T.; Choi, H.N.

    1976-01-01

    A computational model developed for two-dimensional dispersed two-phase flows is applied to steam--water flow in a sudden contraction. The calculational scheme utilizes the cellular approach in which each cell is regarded as a control volume and the droplets are regarded as sources of mass, momentum and energy to the conveying (steam) phase. The predictions show how droplets channel in the entry region and affect the velocity and pressure distributions along the duct

  16. Modeling and analysis of strategic forward contracting in transmission constrained power markets

    International Nuclear Information System (INIS)

    Yu, C.W.; Chung, T.S.; Zhang, S.H.; Wang, X.

    2010-01-01

    Taking the effects of transmission network into account, strategic forward contracting induced by the interaction of generation firms' strategies in the spot and forward markets is investigated. A two-stage game model is proposed to describe generation firms' strategic forward contracting and spot market competition. In the spot market, generation firms behave strategically by submitting bids at their nodes in a form of linear supply function (LSF) and there are arbitrageurs who buy and resell power at different nodes where price differences exceed the costs of transmission. The owner of the grid is assumed to ration limited transmission line capacity to maximize the value of the transmission services in the spot market. The Cournot-type competition is assumed for the strategic forward contract market. This two-stage model is formulated as an equilibrium problem with equilibrium constraints (EPEC); in which each firm's optimization problem in the forward market is a mathematical program with equilibrium constraints (MPEC) and parameter-dependent spot market equilibrium as the inner problem. A nonlinear complementarity method is employed to solve this EPEC model. (author)

  17. Simulating the activation, contraction and movement of skeletal muscles using the bidomain model.

    Science.gov (United States)

    Lopez Rincon, A; Cantu, C; Soto, R; Shimoda, S

    2016-08-01

    A simulation of the muscle activation, contraction and movement is here presented. This system was developed based on the Bidomain mathematical model of the electrical propagation in muscles. This study shows an electrical stimuli input to a muscle and how this behave. The comparison between healthy subject and patient with muscle activation impairment is depicted, depending on whether the signal reaches a threshold. A 3D model of a bicep muscle and a forearm bone connected was constructed using OpenGL. This platform could be used for development of controllers for biomechatronic systems in future works. This kind of bioinspired model could be used for a better understanding of the neuromotor system.

  18. Temporary Workforce Planning with Firm Contracts: A Model and a Simulated Annealing Heuristic

    Directory of Open Access Journals (Sweden)

    Muhammad Al-Salamah

    2011-01-01

    Full Text Available The aim of this paper is to introduce a model for temporary staffing when temporary employment is managed by firm contracts and to propose a simulated annealing-based method to solve the model. Temporary employment is a policy frequently used to adjust the working hour capacity to fluctuating demand. Temporary workforce planning models have been unnecessarily simplified to account for only periodic hiring and laying off; a company can review its workforce requirement every period and make hire-fire decisions accordingly, usually with a layoff cost. We present a more realistic temporary workforce planning model that assumes a firm contract between the worker and the company, which can extend to several periods. The model assumes the traditional constraints, such as inventory balance constraints, worker availability, and labor hour mix. The costs are the inventory holding cost, training cost of the temporary workers, and the backorder cost. The mixed integer model developed for this case has been found to be difficult to solve even for small problem sizes; therefore, a simulated annealing algorithm is proposed to solve the mixed integer model. The performance of the SA algorithm is compared with the CPLEX solution.

  19. Modelling the mid-Pliocene Warm Period climate with the IPSL coupled model and its atmospheric component LMDZ5A

    Directory of Open Access Journals (Sweden)

    C. Contoux

    2012-06-01

    Full Text Available This paper describes the experimental design and model results of the climate simulations of the mid-Pliocene Warm Period (mPWP, ca. 3.3–3 Ma using the Institut Pierre Simon Laplace model (IPSLCM5A, in the framework of the Pliocene Model Intercomparison Project (PlioMIP. We use the IPSL atmosphere ocean general circulation model (AOGCM, and its atmospheric component alone (AGCM, to simulate the climate of the mPWP. Boundary conditions such as sea surface temperatures (SSTs, topography, ice-sheet extent and vegetation are derived from the ones imposed by the Pliocene Model Intercomparison Project (PlioMIP, described in Haywood et al. (2010, 2011. We first describe the IPSL model main features, and then give a full description of the boundary conditions used for atmospheric model and coupled model experiments. The climatic outputs of the mPWP simulations are detailed and compared to the corresponding control simulations. The simulated warming relative to the control simulation is 1.94 °C in the atmospheric and 2.07 °C in the coupled model experiments. In both experiments, warming is larger at high latitudes. Mechanisms governing the simulated precipitation patterns are different in the coupled model than in the atmospheric model alone, because of the reduced gradients in imposed SSTs, which impacts the Hadley and Walker circulations. In addition, a sensitivity test to the change of land-sea mask in the atmospheric model, representing a sea-level change from present-day to 25 m higher during the mid-Pliocene, is described. We find that surface temperature differences can be large (several degrees Celsius but are restricted to the areas that were changed from ocean to land or vice versa. In terms of precipitation, impact on polar regions is minor although the change in land-sea mask is significant in these areas.

  20. A Continuous-Time Agency Model of Optimal Contracting and Capital Structure

    OpenAIRE

    Peter M. DeMarzo; Yuliy Sannikov

    2004-01-01

    We consider a principal-agent model in which the agent needs to raise capital from the principal to finance a project. Our model is based on DeMarzo and Fishman (2003), except that the agent's cash flows are given by a Brownian motion with drift in continuous time. The difficulty in writing an appropriate financial contract in this setting is that the agent can conceal and divert cash flows for his own consumption rather than pay back the principal. Alternatively, the agent may reduce the mea...

  1. Model of excitation-contraction coupling of rat neonatal ventricular myocytes.

    Science.gov (United States)

    Korhonen, Topi; Hänninen, Sandra L; Tavi, Pasi

    2009-02-01

    The neonatal rat ventricular myocyte culture is one of the most popular experimental cardiac cell models. To our knowledge, the excitation-contraction coupling (ECC) of these cells, i.e., the process linking the electrical activity to the cytosolic Ca2+ transient and contraction, has not been previously analyzed, nor has it been presented as a complete system in detail. Neonatal cardiomyocytes are in the postnatal developmental stage, and therefore, the features of their ECC differ vastly from those of adult ventricular myocytes. We present the first complete analysis of ECC in these cells by characterizing experimentally the action potential and calcium signaling and developing the first mathematical model of ECC in neonatal cardiomyocytes that we know of. We show that in comparison to adult cardiomyocytes, neonatal cardiomyocytes have long action potentials, heterogeneous cytosolic Ca2+ signals, weaker sarcoplasmic reticulum Ca2+ handling, and stronger sarcolemmal Ca2+ handling, with a significant contribution by the Na+/Ca2+ exchanger. The developed model reproduces faithfully the ECC of rat neonatal cardiomyocytes with a novel description of spatial cytosolic [Ca2+] signals. Simulations also demonstrate how an increase in the cell size (hypertrophy) affects the ECC in neonatal cardiomyocytes. This model of ECC in developing cardiomyocytes provides a platform for developing future models of cardiomyocytes at different developmental stages.

  2. Fatigue in isometric contraction in a single muscle fibre: a compartmental calcium ion flow model.

    Science.gov (United States)

    Kothiyal, K P; Ibramsha, M

    1986-01-01

    Fatigue in muscle is a complex biological phenomenon which has so far eluded a definite explanation. Many biochemical and physiological models have been suggested in the literature to account for the decrement in the ability of muscle to sustain a given level of force for a long time. Some of these models have been critically analysed in this paper and are shown to be not able to explain all the experimental observations. A new compartmental model based on the intracellular calcium ion movement in muscle is proposed to study the mechanical responses of a muscle fibre. Computer simulation is performed to obtain model responses in isometric contraction to an impulse and a train of stimuli of long duration. The simulated curves have been compared with experimentally observed mechanical responses of the semitendinosus muscle fibre of Rana pipiens. The comparison of computed and observed responses indicates that the proposed calcium ion model indeed accounts very well for the muscle fatigue.

  3. Are Sema5a mutant mice a good model of autism? A behavioral analysis of sensory systems, emotionality and cognition

    Science.gov (United States)

    Gunn, Rhian K.; Huentelman, Matthew J.; Brown, Richard E.

    2011-01-01

    Semaphorin 5A (Sema5A) expression is reduced in the brain of individuals with autism, thus mice with reduced Sema5A levels may serve as a model of this neurodevelopmental disorder. We tested male and female Sema5a knockout mice (B6.129P2SEMA5A/J) and C57BL/6J controls for emotionality, visual ability, prepulse inhibition, motor learning and cognition. Overall, there were only two genotype differences in emotionality: Sema5a mutant mice had more stretch-attend postures in the elevated plus-maze and more defecations in the open field. All mice could see, but Sema5a mice had better visual ability than C57BL/6J mice. There were no genotype differences in sensory-motor gating. Sema5a mice showed higher levels of activity in the elevated plus-maze and light/dark transition box, and there were sex by genotype differences in the Rotarod, suggesting a sex difference in balance and coordination differentially affected by Sema5a. There were no genotype effects on cognition: Sema5a mice did not differ from C57BL/6J in the Morris water maze, set-shifting or cued and contextual fear conditioning. In the social recognition test, all mice preferred social stimuli, but there was no preference for social novelty, thus the Sema5A mice do not have a deficit in social behavior. Overall, there were a number of sex differences, with females showing greater activity and males performing better in tests of spatial learning and memory, but no deficits in the behavior of Sema5A mice. We conclude that the Sema5a mice do not meet the behavioral criteria for a mouse model of autism. PMID:21777623

  4. Legal analysis of contract models in a common Nordic electricity retail market

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerneby, Henrik; Alvik, Ivar

    2012-07-01

    The main objective of this study is to consider the legal advantages and disadvantages with different contract models given NordREG's choice of a supplier centric model with mandatory combined billing in a future Nordic end-user market for electricity.At the outset, there are today three relevant categories of agreements in place between customers, suppliers and DSOs in the Nordic electricity retail markets: the electricity supply agreements between customers and suppliers, the grid use agreements between customers and DSOs, and the grid connection agreements usually entered into between customers and DSOs. We have assumed that issues governed by the grid connection agreements will still be entered into by DSOs under a supplier centric model. Two general contract models have on this basis been considered as possible approaches to regulation of electricity supply and grid use terms under a future supplier centric model. The subcontractor model is considered in more detail in chapter 7 of this report. Under this model, the customer enters into a contract with the supplier governing both electricity supply and grid use. The supplier then enters into a separate contract with the DSO for grid use, making the DSO a subcontractor for this service. The Danish wholesale model which will be implemented from 1 October 2014 represents one example of a subcontractor model.The main advantage of the subcontractor model is that it will entitle the customer to envisage the electricity supply, including grid services, as a single service delivered by the supplier. On the other hand, the sub-contractor model will extend the responsibilities of suppliers towards customers. We discuss the advantages and disadvantages of this model further in section 7.2. The power of attorney model is considered in more detail in chapter 8 of this report. Under this model, the customer and the DSO will still formally be contract parties to the grid use agreement, but the supplier will act with a

  5. On Using Model Populations to Determine Mechanical Properties of Skeletal Muscle. Application to Concentric Contraction Simulation.

    Science.gov (United States)

    Sierra, M; Miana-Mena, F J; Calvo, B; Muñoz, M J; Rodríguez, J F; Grasa, J

    2015-10-01

    In the field of computational biomechanics, the experimental evaluation of the material properties is crucial for the development of computational models that closely reproduce real organ systems. When simulations of muscle tissue are concerned, stress/strain relations for both passive and active behavior are required. These experimental relations usually exhibit certain variability. In this study, a set of material parameters involved in a 3D skeletal muscle model are determined by using a system biology approach in which the parameters are randomly varied leading to a population of models. Using a set of experimental results from an animal model, a subset of the entire population of models was selected. This reduced population predicted the mechanical response within the window of experimental observations. Hence, a range of model parameters, instead of a single set of them, was determined. Rat Tibialis Anterior muscle was selected for this study. Muscles ([Formula: see text]) were activated through the sciatic nerve and during contraction the tissue pulled a weight fixed to the distal tendon (concentric contraction). Three different weights 1, 2 and 3 N were used and the time course of muscle stretch was analyzed obtaining values of (mean [Formula: see text] standard deviation): [Formula: see text], [Formula: see text] and [Formula: see text] respectively. A paired two-sided sign rank test showed significant differences between the muscle response for the three weights ([Formula: see text]). This study shows that the Monte Carlo method could be used for determine muscle characteristic parameters considering the variability of the experimental population.

  6. Universal fit to p-p elastic diffraction scattering from the Lorentz contracted geometrical model

    International Nuclear Information System (INIS)

    Hansen, P.H.; Krisch, A.D.

    1976-01-01

    The prediction of the Lorentz contracted geometical model for proton-proton elastic scattering at small angles is examined. The model assumes that when two high energy particles collide, each behaves as a geometrical object which has a Gaussian density and is spherically symmetric except for the Lorentz contraction in the incident direction. It is predicted that dsigma/dt should be independent of energy when plotted against the variable β 2 P 2 sub(perpendicular) sigmasub(TOT)(s)/38.3. Thus the energy dependence of the diffraction peak slope (b in an esup(-b mod(t))plot) is given by b(s)=A 2 β 2 sigmasub(TOT)(s)/38.3 where β is the proton's c.m. velocity and A is its radius. Recently measured values of sigmasub(TOT)(s) were used and an excellent fit obtained to the elastic slope in both t regions [-t 2 and 0.1 2 ] at all energies from s=6 to 4000(GeV/c) 2 . (Auth.)

  7. Cross-scale Efficient Tensor Contractions for Coupled Cluster Computations Through Multiple Programming Model Backends

    Energy Technology Data Exchange (ETDEWEB)

    Ibrahim, Khaled Z. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Computational Research Division; Epifanovsky, Evgeny [Q-Chem, Inc., Pleasanton, CA (United States); Williams, Samuel W. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Computational Research Division; Krylov, Anna I. [Univ. of Southern California, Los Angeles, CA (United States). Dept. of Chemistry

    2016-07-26

    Coupled-cluster methods provide highly accurate models of molecular structure by explicit numerical calculation of tensors representing the correlation between electrons. These calculations are dominated by a sequence of tensor contractions, motivating the development of numerical libraries for such operations. While based on matrix-matrix multiplication, these libraries are specialized to exploit symmetries in the molecular structure and in electronic interactions, and thus reduce the size of the tensor representation and the complexity of contractions. The resulting algorithms are irregular and their parallelization has been previously achieved via the use of dynamic scheduling or specialized data decompositions. We introduce our efforts to extend the Libtensor framework to work in the distributed memory environment in a scalable and energy efficient manner. We achieve up to 240 speedup compared with the best optimized shared memory implementation. We attain scalability to hundreds of thousands of compute cores on three distributed-memory architectures, (Cray XC30&XC40, BlueGene/Q), and on a heterogeneous GPU-CPU system (Cray XK7). As the bottlenecks shift from being compute-bound DGEMM's to communication-bound collectives as the size of the molecular system scales, we adopt two radically different parallelization approaches for handling load-imbalance. Nevertheless, we preserve a uni ed interface to both programming models to maintain the productivity of computational quantum chemists.

  8. A Marketing-Finance Approach towards Industrial Channel Contract Relationships: A Model and Application

    NARCIS (Netherlands)

    Pennings, J.M.E.

    2004-01-01

    Channel contract relations are dynamic. In this paper, it is argued that one of the drivers for this dynamism is a firm's strive for shareholder value. Using channel contract relationships as market-based assets, firms are managing a portfolio of spot and forward contract relationships. By

  9. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  10. Spot markets vs. long-term contracts - modelling tools for regional electricity generating utilities

    International Nuclear Information System (INIS)

    Grohnheit, P.E.

    1999-01-01

    A properly organised market for electricity requires that some information will be available for all market participants. Also a range of generally available modelling tools are necessary. This paper describes a set of simple models based on published data for analyses of the long-term revenues of regional utilities with combined heat and power generation (CHP), who will operate a competitive international electricity market and a local heat market. The future revenues from trade on the spot market is analysed using a load curve model, in which marginal costs are calculated on the basis of short-term costs of the available units and chronological hourly variations in the demands for electricity and heat. Assumptions on prices, marginal costs and electricity generation by the different types of generating units are studied for selected types of local electricity generators. The long-term revenue requirements to be met by long-term contracts are analysed using a traditional techno-economic optimisation model focusing on technology choice and competition among technologies over 20.30 years. A possible conclusion from this discussion is that it is important for the economic and environmental efficiency of the electricity market that local or regional generators of CHP, who are able to react on price signals, do not conclude long-term contracts that include fixed time-of-day tariff for sale of electricity. Optimisation results for a CHP region (represented by the structure of the Danish electricity and CHP market in 1995) also indicates that a market for CO 2 tradable permits is unlikely to attract major non-fossil fuel technologies for electricity generation, e.g. wind power. (au)

  11. Efficient Structure-Based Models for the McKibben Contraction Pneumatic Muscle Actuator: The Full Description of the Behaviour of the Contraction PMA

    Directory of Open Access Journals (Sweden)

    Alaa Al-Ibadi

    2017-10-01

    Full Text Available To clarify the advantages of using soft robots in all aspects of life, the effective behaviour of the pneumatic muscle actuator (PMA must be known. In this work, the performances of the PMA are explained and modelled with three formulas. The first formula describes the pulling force of the actuator based on the structure parameters; furthermore, the formula presented is the generalised contraction force for wholly-pneumatic muscle actuators. The second important model is the length formula, which is modified to our previous work to fit different actuator structures. Based on these two models, the stiffness of the actuator is formulated to illustrate its variability at different air pressure amounts. In addition, these formulas will make the selection of proper actuators for any robot arm structure easier using the knowledge gained from their performance. On the other hand, the desired behaviour of this type of actuator will be predefined and controlled.

  12. Eccentric Contraction-Induced Muscle Injury: Reproducible, Quantitative, Physiological Models to Impair Skeletal Muscle's Capacity to Generate Force.

    Science.gov (United States)

    Call, Jarrod A; Lowe, Dawn A

    2016-01-01

    In order to investigate the molecular and cellular mechanisms of muscle regeneration an experimental injury model is required. Advantages of eccentric contraction-induced injury are that it is a controllable, reproducible, and physiologically relevant model to cause muscle injury, with injury being defined as a loss of force generating capacity. While eccentric contractions can be incorporated into conscious animal study designs such as downhill treadmill running, electrophysiological approaches to elicit eccentric contractions and examine muscle contractility, for example before and after the injurious eccentric contractions, allows researchers to circumvent common issues in determining muscle function in a conscious animal (e.g., unwillingness to participate). Herein, we describe in vitro and in vivo methods that are reliable, repeatable, and truly maximal because the muscle contractions are evoked in a controlled, quantifiable manner independent of subject motivation. Both methods can be used to initiate eccentric contraction-induced injury and are suitable for monitoring functional muscle regeneration hours to days to weeks post-injury.

  13. Iterated non-linear model predictive control based on tubes and contractive constraints.

    Science.gov (United States)

    Murillo, M; Sánchez, G; Giovanini, L

    2016-05-01

    This paper presents a predictive control algorithm for non-linear systems based on successive linearizations of the non-linear dynamic around a given trajectory. A linear time varying model is obtained and the non-convex constrained optimization problem is transformed into a sequence of locally convex ones. The robustness of the proposed algorithm is addressed adding a convex contractive constraint. To account for linearization errors and to obtain more accurate results an inner iteration loop is added to the algorithm. A simple methodology to obtain an outer bounding-tube for state trajectories is also presented. The convergence of the iterative process and the stability of the closed-loop system are analyzed. The simulation results show the effectiveness of the proposed algorithm in controlling a quadcopter type unmanned aerial vehicle. Copyright © 2016 ISA. Published by Elsevier Ltd. All rights reserved.

  14. Psychological contract breaches, organizational commitment, and innovation-related behaviors: a latent growth modeling approach.

    Science.gov (United States)

    Ng, Thomas W H; Feldman, Daniel C; Lam, Simon S K

    2010-07-01

    This study examined the relationships among psychological contract breaches, organizational commitment, and innovation-related behaviors (generating, spreading, implementing innovative ideas at work) over a 6-month period. Results indicate that the effects of psychological contract breaches on employees are not static. Specifically, perceptions of psychological contract breaches strengthened over time and were associated with decreased levels of affective commitment over time. Further, increased perceptions of psychological contract breaches were associated with decreases in innovation-related behaviors. We also found evidence that organizational commitment mediates the relationship between psychological contract breaches and innovation-related behaviors. These results highlight the importance of examining the nomological network of psychological contract breaches from a change perspective.

  15. Acquisition War-Gaming Technique for Acquiring Future Complex Systems: Modeling and Simulation Results for Cost Plus Incentive Fee Contract

    Directory of Open Access Journals (Sweden)

    Tien M. Nguyen

    2018-03-01

    Full Text Available This paper provides a high-level discussion and propositions of frameworks and models for acquisition strategy of complex systems. In particular, it presents an innovative system engineering approach to model the Department of Defense (DoD acquisition process and offers several optimization modules including simulation models using game theory and war-gaming concepts. Our frameworks employ Advanced Game-based Mathematical Framework (AGMF and Unified Game-based Acquisition Framework (UGAF, and related advanced simulation and mathematical models that include a set of War-Gaming Engines (WGEs implemented in MATLAB statistical optimization models. WGEs are defined as a set of algorithms, characterizing the Program and Technical Baseline (PTB, technology enablers, architectural solutions, contract type, contract parameters and associated incentives, and industry bidding position. As a proof of concept, Aerospace, in collaboration with the North Carolina State University (NCSU and University of Hawaii (UH, successfully applied and extended the proposed frameworks and decision models to determine the optimum contract parameters and incentives for a Cost Plus Incentive Fee (CPIF contract. As a result, we can suggest a set of acquisition strategies that ensure the optimization of the PTB.

  16. MODELING THE RADIO EMISSION FROM Cyg OB2 NO. 5: A QUADRUPLE SYSTEM?

    International Nuclear Information System (INIS)

    Kennedy, M.; Dougherty, S. M.; Fink, A.; Williams, P. M.

    2010-01-01

    Fifty observations at frequencies between 1.4 GHz and 43 GHz of the 6.6 day O6.5-7+O5.5-6 binary Cyg OB2 No. 5 using the Very Large Array over 20 years are re-examined. The aim is to determine the location and character of the previously detected variable radio emission. The radio emission from the system consists of a primary component that is associated with the binary, and a non-thermal source (NE), 0.''8 to the NE of the binary that has been ascribed to a wind-collision region (WCR) between the stellar winds of the binary and that of a B-type star (Star D) to the NE. Previous studies have not accounted for the potential contribution of NE to the total radio emission, most especially in observations where the primary and NE sources are not resolved as separate sources. NE shows no evidence of variation in 23 epochs where it is resolved separately from the primary radio component, demonstrating that the variable emission arises in the primary component. Since NE is non-variable, the radio flux from the primary can now be well determined for the first time, most especially in observations that do not resolve both the primary and NE components. The variable radio emission from the primary component has a period of 6.7 ± 0.3 years which is described by a simple model of a non-thermal source orbiting within the stellar wind envelope of the binary. Such a model implies the presence of a third, unresolved stellar companion (Star C) orbiting the 6.6 day binary with a period of 6.7 years and independent of Star D to the NE. The variable non-thermal emission arises from either a WCR between Star C and the binary system, or possibly from Star C directly. The model gives a mass-loss rate of 3.4 x 10 -5 M sun yr -1 for Cyg OB2 No. 5, unusually high for an Of supergiant and comparable to that of WR stars, and consistent with an unusually strong He I 1.083 μm emission line, also redolent of WR stars. An examination of radial velocity observations available from the

  17. Model-based inverse estimation for active contraction stresses of tongue muscles using 3D surface shape in speech production.

    Science.gov (United States)

    Koike, Narihiko; Ii, Satoshi; Yoshinaga, Tsukasa; Nozaki, Kazunori; Wada, Shigeo

    2017-11-07

    This paper presents a novel inverse estimation approach for the active contraction stresses of tongue muscles during speech. The proposed method is based on variational data assimilation using a mechanical tongue model and 3D tongue surface shapes for speech production. The mechanical tongue model considers nonlinear hyperelasticity, finite deformation, actual geometry from computed tomography (CT) images, and anisotropic active contraction by muscle fibers, the orientations of which are ideally determined using anatomical drawings. The tongue deformation is obtained by solving a stationary force-equilibrium equation using a finite element method. An inverse problem is established to find the combination of muscle contraction stresses that minimizes the Euclidean distance of the tongue surfaces between the mechanical analysis and CT results of speech production, where a signed-distance function represents the tongue surface. Our approach is validated through an ideal numerical example and extended to the real-world case of two Japanese vowels, /ʉ/ and /ɯ/. The results capture the target shape completely and provide an excellent estimation of the active contraction stresses in the ideal case, and exhibit similar tendencies as in previous observations and simulations for the actual vowel cases. The present approach can reveal the relative relationship among the muscle contraction stresses in similar utterances with different tongue shapes, and enables the investigation of the coordination of tongue muscles during speech using only the deformed tongue shape obtained from medical images. This will enhance our understanding of speech motor control. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. Chemistry of Furan Conversion into Aromatics and Olefins over HZSM-5: A Model Biomass Conversion Reaction

    Energy Technology Data Exchange (ETDEWEB)

    Cheng, Yu-Ting; Huber, George W.

    2011-06-03

    The conversion of furan (a model of cellulosic biomass) over HZSM-5 was investigated in a thermogravimetric analysis–mass spectrometry system, in situ Fourier transform infrared analysis, and in a continuous-flow fixed-bed reactor. Furan adsorbed as oligomers at room temperature with a 1.73 of adsorbed furan/Al ratio. These oligomers were polycyclic aromatic compounds that were converted to CO, CO₂, aromatics, and olefins at temperatures from 400 to 600 °C. Aromatics (e.g., benzene, toluene, and naphthalene), oligomer isomers (e.g., benzofuran, 2,2-methylenebisfuran, and benzodioxane), and heavy oxygenates (C₁₂{sub +} oligomers) were identified as intermediates formed inside HZSM-5 at different reaction temperatures. During furan conversion, graphite-type coke formed on the catalyst surface, which caused the aromatics and olefins formation to deactivate within the first 30 min of time on-stream. We have measured the effects of space velocity and temperature for furan conversion to help us understand the chemistry of biomass conversion inside zeolite catalysts. The major products for furan conversion included CO, CO₂, allene, C₂–C₆ olefins, benzene, toluene, styrene, benzofuran, indene, and naphthalene. The aromatics (benzene and toluene) and olefins (ethylene and propylene) selectivity decreased with increasing space velocity. Unsaturated hydrocarbons such as allene, cyclopentadiene, and aromatics selectivity increased with increasing space velocity. The product distribution was selective to olefins and CO at high temperatures (650 °C) but was selective to aromatics (benzene and toluene) at intermediate temperatures (450–600 °C). At low temperatures (450 °C), benzofuran and coke contributed 60% of the carbon selectivity. Several different reactions were occurring for furan conversion over zeolites. Some important reactions that we have identified in this study include Diels–Alder condensation (e.g., two furans form benzofuran and water

  19. Modeling Flare Hard X-ray Emission from Electrons in Contracting Magnetic Islands

    Science.gov (United States)

    Guidoni, Silvina E.; Allred, Joel C.; Alaoui, Meriem; Holman, Gordon D.; DeVore, C. Richard; Karpen, Judith T.

    2016-05-01

    The mechanism that accelerates particles to the energies required to produce the observed impulsive hard X-ray emission in solar flares is not well understood. It is generally accepted that this emission is produced by a non-thermal beam of electrons that collides with the ambient ions as the beam propagates from the top of a flare loop to its footpoints. Most current models that investigate this transport assume an injected beam with an initial energy spectrum inferred from observed hard X-ray spectra, usually a power law with a low-energy cutoff. In our previous work (Guidoni et al. 2016), we proposed an analytical method to estimate particle energy gain in contracting, large-scale, 2.5-dimensional magnetic islands, based on a kinetic model by Drake et al. (2010). We applied this method to sunward-moving islands formed high in the corona during fast reconnection in a simulated eruptive flare. The overarching purpose of the present work is to test this proposed acceleration model by estimating the hard X-ray flux resulting from its predicted accelerated-particle distribution functions. To do so, we have coupled our model to a unified computational framework that simulates the propagation of an injected beam as it deposits energy and momentum along its way (Allred et al. 2015). This framework includes the effects of radiative transfer and return currents, necessary to estimate flare emission that can be compared directly to observations. We will present preliminary results of the coupling between these models.

  20. Decadal prediction skill in the ocean with surface nudging in the IPSL-CM5A-LR climate model

    OpenAIRE

    Mignot , Juliette; García-Serrano , Javier; Swingedouw , Didier; Germe , Agathe; Nguyen , Sébastien; Ortega , Pablo; Guilyardi , Éric; Ray , Sulagna

    2016-01-01

    International audience; Two decadal prediction ensembles, based on the same climate model (IPSL-CM5A-LR) and the same surface nudging initialization strategy are analyzed and compared with a focus on upper-ocean variables in different regions of the globe. One ensemble consists of 3-member hindcasts launched every year since 1961 while the other ensemble benefits from 9 members but with start dates only every 5 years. Analysis includes anomaly correlation coefficients and root mean square err...

  1. Retractable Contracts

    Directory of Open Access Journals (Sweden)

    Franco Barbanera

    2016-02-01

    Full Text Available In calculi for modelling communication protocols, internal and external choices play dual roles. Two external choices can be viewed naturally as dual too, as they represent an agreement between the communicating parties. If the interaction fails, the past agreements are good candidates as points where to roll back, in order to take a different agreement. We propose a variant of contracts with synchronous rollbacks to agreement points in case of deadlock. The new calculus is equipped with a compliance relation which is shown to be decidable.

  2. Influence of Joint Angle on EMG-Torque Model During Constant-Posture, Torque-Varying Contractions.

    Science.gov (United States)

    Liu, Pu; Liu, Lukai; Clancy, Edward A

    2015-11-01

    Relating the electromyogram (EMG) to joint torque is useful in various application areas, including prosthesis control, ergonomics and clinical biomechanics. Limited study has related EMG to torque across varied joint angles, particularly when subjects performed force-varying contractions or when optimized modeling methods were utilized. We related the biceps-triceps surface EMG of 22 subjects to elbow torque at six joint angles (spanning 60° to 135°) during constant-posture, torque-varying contractions. Three nonlinear EMG σ -torque models, advanced EMG amplitude (EMG σ ) estimation processors (i.e., whitened, multiple-channel) and the duration of data used to train models were investigated. When EMG-torque models were formed separately for each of the six distinct joint angles, a minimum "gold standard" error of 4.01±1.2% MVC(F90) resulted (i.e., error relative to maximum voluntary contraction at 90° flexion). This model structure, however, did not directly facilitate interpolation across angles. The best model which did so achieved a statistically equivalent error of 4.06±1.2% MVC(F90). Results demonstrated that advanced EMG σ processors lead to improved joint torque estimation as do longer model training durations.

  3. Treatment with the C5a receptor antagonist ADC-1004 reduces myocardial infarction in a porcine ischemia-reperfusion model

    Directory of Open Access Journals (Sweden)

    Arheden Håkan

    2010-09-01

    Full Text Available Abstract Background Polymorphonuclear neutrophils, stimulated by the activated complement factor C5a, have been implicated in cardiac ischemia/reperfusion injury. ADC-1004 is a competitive C5a receptor antagonist that has been shown to inhibit complement related neutrophil activation. ADC-1004 shields the neutrophils from C5a activation before they enter the reperfused area, which could be a mechanistic advantage compared to previous C5a directed reperfusion therapies. We investigated if treatment with ADC-1004, according to a clinically applicable protocol, would reduce infarct size and microvascular obstruction in a large animal myocardial infarct model. Methods In anesthetized pigs (42-53 kg, a percutaneous coronary intervention balloon was inflated in the left anterior descending artery for 40 minutes, followed by 4 hours of reperfusion. Twenty minutes after balloon inflation the pigs were randomized to an intravenous bolus administration of ADC-1004 (175 mg, n = 8 or saline (9 mg/ml, n = 8. Area at risk (AAR was evaluated by ex vivo SPECT. Infarct size and microvascular obstruction were evaluated by ex vivo MRI. The observers were blinded to the treatment at randomization and analysis. Results ADC-1004 treatment reduced infarct size by 21% (ADC-1004: 58.3 ± 3.4 vs control: 74.1 ± 2.9%AAR, p = 0.007. Microvascular obstruction was similar between the groups (ADC-1004: 2.2 ± 1.2 vs control: 5.3 ± 2.5%AAR, p = 0.23. The mean plasma concentration of ADC-1004 was 83 ± 8 nM at sacrifice. There were no significant differences between the groups with respect to heart rate, mean arterial pressure, cardiac output and blood-gas data. Conclusions ADC-1004 treatment reduces myocardial ischemia-reperfusion injury and represents a novel treatment strategy of myocardial infarct with potential clinical applicability.

  4. It's all in the timing: modeling isovolumic contraction through development and disease with a dynamic dual electromechanical bioreactor system.

    Science.gov (United States)

    Morgan, Kathy Ye; Black, Lauren Deems

    2014-01-01

    This commentary discusses the rationale behind our recently reported work entitled "Mimicking isovolumic contraction with combined electromechanical stimulation improves the development of engineered cardiac constructs," introduces new data supporting our hypothesis, and discusses future applications of our bioreactor system. The ability to stimulate engineered cardiac tissue in a bioreactor system that combines both electrical and mechanical stimulation offers a unique opportunity to simulate the appropriate dynamics between stretch and contraction and model isovolumic contraction in vitro. Our previous study demonstrated that combined electromechanical stimulation that simulated the timing of isovolumic contraction in healthy tissue improved force generation via increased contractile and calcium handling protein expression and improved hypertrophic pathway activation. In new data presented here, we further demonstrate that modification of the timing between electrical and mechanical stimulation to mimic a non-physiological process negatively impacts the functionality of the engineered constructs. We close by exploring the various disease states that have altered timing between the electrical and mechanical stimulation signals as potential future directions for the use of this system.

  5. ANSYS modeling of thermal contraction of SPL HOM couplers during cool-down

    CERN Document Server

    Papke, K

    2016-01-01

    During the cool-down the HOM coupler as well as the cavity inside the cryo module experience a thermal contraction. For most materials between room temperature and liquid helium temperatures, the changes in dimension are in the order of a few tenths of a percent change in volume. This paper presents the effect of thermal contraction on the RF transmission behavior of HOM couplers, and in particular the influence on its notch filter. Furthermore the simulation process with APDL is explained in detail. Conclusions about the necessary tuning range of the notch filter are made which is especially a concern for couplers with only notch filter.

  6. The ICE-6G_C (VM5a) Global Model of the GIA Process: Antarctica at High Spatial Resolution

    Science.gov (United States)

    Peltier, W. R.; Drummond, R.; Argus, D. F.

    2016-12-01

    The ICE-6G_C (VM5a) global model of the glacial isostatic adjustment process (Argus et al., 2014 GJI 198, 537-563; Peltier et al. , 2015, JGR 119, doi:10.1002/2014JB011176) is the latest model in the ICE-nG (VMx) sequence. The model continues to be unique in that it is the only model whose properties are made freely available at each iterative step in its development. This latest version, which embodies detailed descriptions of the Laurentide , Fennoscandian/Barents Sea, Greenland and Antarctic ice sheets through the most recent glacial cycle, is a refinement based primarily upon the incorporation of the constraints being provided by GPS measurements of the vertical and horizontal motion of the crust as well as GRACE observations of the time dependent gravity field. The model has been shown to provide exceptionally accurate predictions of these space geodetic observations of the response to the most recent Late Quaternary glacial cycle. Particular attention has been paid to the Antarctic component as it is well known on the basis of analyses of the sedimentary stratigraphy off-shore and geomorphological characteristics of the continental shelf, that the Last Glacial Maximum state of the southern continent was one in which grounded ice extended out to the shelf break in most locations, including significant fractions of the Ross Sea and Weddell Sea embayments. In the latter regions especially, it is expected that grounded ice would have existed below sea level. In ICE-6G_C (VM5a) a grounding line tracking algorithm was employed (Stuhne and Peltier, 2015 JGR 120, 1841-1865) in order to describe the unloading of the solid surface by ice that was initially grounded below sea level, an apparently unique characteristic of this model. In the initially published version, in which the Sea Level Equation (SLE) was inverted on a basis of spherical harmonics truncated at degree and order 256, this led to "ringing" in the embayments when the Stokes coefficients of the model

  7. The effects of residential real-time pricing contracts on transco loads, pricing, and profitability: Simulations using the N-ABLE trademark agent-based model

    International Nuclear Information System (INIS)

    Ehlen, Mark A.; Scholand, Andrew J.; Stamber, Kevin L.

    2007-01-01

    An agent-based model is constructed in which a demand aggregator sells both uniform-price and real-time price (RTP) contracts to households as means for adding price elasticity in residential power use sectors, particularly during peak-price hours of the day. Simulations suggest that RTP contracts help a demand aggregator (1) shift its long-term contracts toward off-peak hours, thereby reducing its cost of power and (2) increase its short-run profits if it is one of the first aggregators to have large numbers of RTP contracts; but (3) create susceptibilities to short-term market demand and price volatilities. (author)

  8. An Approach for Simulation of the Muscle Force Modeling It by Summation of Motor Unit Contraction Forces

    Directory of Open Access Journals (Sweden)

    Rositsa Raikova

    2013-01-01

    Full Text Available Muscle force is due to the cumulative effect of repetitively contracting motor units (MUs. To simulate the contribution of each MU to whole muscle force, an approach implemented in a novel computer program is proposed. The individual contraction of an MU (the twitch is modeled by a 6-parameter analytical function previously proposed; the force of one MU is a sum of its contractions due to an applied stimulation pattern, and the muscle force is the sum of the active MUs. The number of MUs, the number of slow, fast-fatigue-resistant, and fast-fatigable MUs, and their six parameters as well as a file with stimulation patterns for each MU are inputs for the developed software. Different muscles and different firing patterns can be simulated changing the input data. The functionality of the program is illustrated with a model consisting of 30 MUs of rat medial gastrocnemius muscle. The twitches of these MUs were experimentally measured and modeled. The forces of the MUs and of the whole muscle were simulated using different stimulation patterns that included different regular, irregular, synchronous, and asynchronous firing patterns of MUs. The size principle of MUs for recruitment and derecruitment was also demonstrated using different stimulation paradigms.

  9. Mechano-electric feedback effects in a three-dimensional (3D model of the contracting cardiac ventricle.

    Directory of Open Access Journals (Sweden)

    Ani Amar

    Full Text Available Mechano-electric feedback affects the electrophysiological and mechanical function of the heart and the cellular, tissue, and organ properties. To determine the main factors that contribute to this effect, this study investigated the changes in the action potential characteristics of the ventricle during contraction. A model of stretch-activated channels was incorporated into a three-dimensional multiscale model of the contracting ventricle to assess the effect of different preload lengths on the electrophysiological behavior. The model describes the initiation and propagation of the electrical impulse, as well as the passive (stretch and active (contraction changes in the cardiac mechanics. Simulations were performed to quantify the relationship between the cellular activation and recovery patterns as well as the action potential durations at different preload lengths in normal and heart failure pathological conditions. The simulation results showed that heart failure significantly affected the excitation propagation parameters compared to normal condition. The results showed that the mechano-electrical feedback effects appear to be most important in failing hearts with low ejection fraction.

  10. Mistake and non-disclosure of facts: models for English contract law

    NARCIS (Netherlands)

    Beale, H.

    2012-01-01

    This book examines the case for reforming the law on mistake and non-disclosure of fact to bring English law closer to the law in much of continental Europe. There, and in common law countries like the US, a party may avoid a contract for mistake of fact on a more liberal basis, and a party who

  11. Life cycle cost-based risk model for energy performance contracting retrofits

    Science.gov (United States)

    Berghorn, George H.

    Buildings account for 41% of the primary energy consumption in the United States, nearly half of which is accounted for by commercial buildings. Among the greatest energy users are those in the municipalities, universities, schools, and hospitals (MUSH) market. Correctional facilities are in the upper half of all commercial building types for energy intensity. Public agencies have experienced reduced capital budgets to fund retrofits; this has led to the increased use of energy performance contracts (EPC), which are implemented by energy services companies (ESCOs). These companies guarantee a minimum amount of energy savings resulting from the retrofit activities, which in essence transfers performance risk from the owner to the contractor. Building retrofits in the MUSH market, especially correctional facilities, are well-suited to EPC, yet despite this potential and their high energy intensities, efficiency improvements lag behind that of other public building types. Complexities in project execution, lack of support for data requests and sub-metering, and conflicting project objectives have been cited as reasons for this lag effect. As a result, project-level risks must be understood in order to support wider adoption of retrofits in the public market, in particular the correctional facility sub-market. The goal of this research is to understand risks related to the execution of energy efficiency retrofits delivered via EPC in the MUSH market. To achieve this goal, in-depth analysis and improved understanding was sought with regard to ESCO risks that are unique to EPC in this market. The proposed work contributes to this understanding by developing a life cycle cost-based risk model to improve project decision making with regard to risk control and reduction. The specific objectives of the research are: (1) to perform an exploratory analysis of the EPC retrofit process and identify key areas of performance risk requiring in-depth analysis; (2) to construct a

  12. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  13. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  14. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  15. Standard Port-Visit Cost Forecasting Model for U.S. Navy Husbanding Contracts

    Science.gov (United States)

    2009-12-01

    Protocol (HTTP) server.35 2. MySQL . An open-source database.36 3. PHP . A common scripting language used for Web development.37 E. IMPLEMENTATION OF...Inc. (2009). MySQL Community Server (Version 5.1) [Software]. Available from http://dev.mysql.com/downloads/ 37 The PHP Group (2009). PHP (Version...Logistics Services MySQL My Structured Query Language NAVSUP Navy Supply Systems Command NC Non-Contract Items NPS Naval Postgraduate

  16. Flow Characteristics and Status of CFD Hydrodynamic Model Development in Sudden Contraction Manifold/Orifice Configurations

    Science.gov (United States)

    2011-07-01

    Branching Configuration 33 6.6 CONTRACTION COEFFICIENT 35 7.0 SUPERCAVITATION 36 7.1 FLOW REATTACHMENT 36 7.1.1 In-Line... SUPERCAVITATION 37 7.2.1 In-Line Configuration Critical Cavitation 37 7.2.2 Dead Head Configuration Critical Cavitation 38 7.2.3 Approach...regimes are: (1) Non-Cavitation, (2) Inception of Cavitation, (3) Full Cavitation, (4) Supercavitation , and (5) Hydraulic Flip. The flow

  17. Postglacial Rebound and Current Ice Loss Estimates from Space Geodesy: The New ICE-6G (VM5a) Global Model

    Science.gov (United States)

    Peltier, W. R.; Argus, D.; Drummond, R.; Moore, A. W.

    2012-12-01

    We compare, on a global basis, estimates of site velocity against predictions of the newly constructed postglacial rebound model ICE-6G (VM5a). This model is fit to observations of North American postglacial rebound thereby demonstrating that the ice sheet at last glacial maximum must have been, relative to ICE-5G,thinner in southern Manitoba, thinner near Yellowknife (northwest Territories), thicker in eastern and southern Quebec, and thicker along the British Columbia-Alberta border. The GPS based estimates of site velocity that we employ are more accurate than were previously available because they are based on GPS estimates of position as a function of time determined by incorporating satellite phase center variations [Desai et al. 2011]. These GPS estimates are constraining postglacial rebound in North America and Europe more tightly than ever before. In particular, given the high density of GPS sites in North America, and the fact that the velocity of the mass center (CM) of Earth is also more tightly constrained, the new model much more strongly constrains both the lateral extent of the proglacial forebulge and the rate at which this peripheral bulge (that was emplaced peripheral to the late Pleistocence Laurentia ice sheet) is presently collapsing. This fact proves to be important to the more accurate inference of the current rate of ice loss from both Greenland and Alaska based upon the time dependent gravity observations being provided by the GRACE satellite system. In West Antarctica we have also been able to significantly revise the previously prevalent ICE-5G deglaciation history so as to enable its predictions to be optimally consistent with GPS site velocities determined by connecting campaign WAGN measurements to those provided by observations from the permanent ANET sites. Ellsworth Land (south of the Antarctic peninsula), is observed to be rising at 6 ±3 mm/yr according to our latest analyses; the Ellsworth mountains themselves are observed to be

  18. [Barriers to the normalization of telemedicine in a healthcare system model based on purchasing of healthcare services using providers' contracts].

    Science.gov (United States)

    Roig, Francesc; Saigí, Francesc

    2011-01-01

    Despite the clear political will to promote telemedicine and the large number of initiatives, the incorporation of this modality in clinical practice remains limited. The objective of this study was to identify the barriers perceived by key professionals who actively participate in the design and implementation of telemedicine in a healthcare system model based on purchasing of healthcare services using providers' contracts. We performed a qualitative study based on data from semi-structured interviews with 17 key informants belonging to distinct Catalan health organizations. The barriers identified were grouped in four areas: technological, organizational, human and economic. The main barriers identified were changes in the healthcare model caused by telemedicine, problems with strategic alignment, resistance to change in the (re)definition of roles, responsibilities and new skills, and lack of a business model that incorporates telemedicine in the services portfolio to ensure its sustainability. In addition to suitable management of change and of the necessary strategic alignment, the definitive normalization of telemedicine in a mixed healthcare model based on purchasing of healthcare services using providers' contracts requires a clear and stable business model that incorporates this modality in the services portfolio and allows healthcare organizations to obtain reimbursement from the payer. 2010 SESPAS. Published by Elsevier Espana. All rights reserved.

  19. Generation of a scale-invariant spectrum of adiabatic fluctuations in cosmological models with a contracting phase

    International Nuclear Information System (INIS)

    Finelli, Fabio; Brandenberger, Robert

    2002-01-01

    In pre-big-bang and in ekpyrotic cosmology, perturbations on cosmological scales today are generated from quantum vacuum fluctuations during a phase when the Universe is contracting (viewed in the Einstein frame). The backgrounds studied to date do not yield a scale-invariant spectrum of adiabatic fluctuations. Here, we present a new contracting background model (neither of pre-big-bang nor of the ekpyrotic form) involving a single scalar field coupled to gravity in which a scale-invariant spectrum of curvature fluctuations and gravitational waves results. The equation of state of this scalar field corresponds to cold matter. We demonstrate that if this contracting phase can be matched via a nonsingular bounce to an expanding Friedmann cosmology, the scale-invariance of the curvature fluctuations is maintained. We also find new background solutions for pre-big-bang and for ekpyrotic cosmology, which involve two scalar fields with exponential potentials with background values which are evolving in time. We comment on the difficulty of obtaining a scale-invariant spectrum of adiabatic fluctuations with background solutions which have been studied in the past

  20. Where neuroscience and dynamic system theory meet autonomous robotics: a contracting basal ganglia model for action selection.

    Science.gov (United States)

    Girard, B; Tabareau, N; Pham, Q C; Berthoz, A; Slotine, J-J

    2008-05-01

    Action selection, the problem of choosing what to do next, is central to any autonomous agent architecture. We use here a multi-disciplinary approach at the convergence of neuroscience, dynamical system theory and autonomous robotics, in order to propose an efficient action selection mechanism based on a new model of the basal ganglia. We first describe new developments of contraction theory regarding locally projected dynamical systems. We exploit these results to design a stable computational model of the cortico-baso-thalamo-cortical loops. Based on recent anatomical data, we include usually neglected neural projections, which participate in performing accurate selection. Finally, the efficiency of this model as an autonomous robot action selection mechanism is assessed in a standard survival task. The model exhibits valuable dithering avoidance and energy-saving properties, when compared with a simple if-then-else decision rule.

  1. Decadal prediction skill in the ocean with surface nudging in the IPSL-CM5A-LR climate model

    Science.gov (United States)

    Mignot, Juliette; García-Serrano, Javier; Swingedouw, Didier; Germe, Agathe; Nguyen, Sébastien; Ortega, Pablo; Guilyardi, Eric; Ray, Sulagna

    2016-08-01

    Two decadal prediction ensembles, based on the same climate model (IPSL-CM5A-LR) and the same surface nudging initialization strategy are analyzed and compared with a focus on upper-ocean variables in different regions of the globe. One ensemble consists of 3-member hindcasts launched every year since 1961 while the other ensemble benefits from 9 members but with start dates only every 5 years. Analysis includes anomaly correlation coefficients and root mean square errors computed against several reanalysis and gridded observational fields, as well as against the nudged simulation used to produce the hindcasts initial conditions. The last skill measure gives an upper limit of the predictability horizon one can expect in the forecast system, while the comparison with different datasets highlights uncertainty when assessing the actual skill. Results provide a potential prediction skill (verification against the nudged simulation) beyond the linear trend of the order of 10 years ahead at the global scale, but essentially associated with non-linear radiative forcings, in particular from volcanoes. At regional scale, we obtain 1 year in the tropical band, 10 years at midlatitudes in the North Atlantic and North Pacific, and 5 years at tropical latitudes in the North Atlantic, for both sea surface temperature (SST) and upper-ocean heat content. Actual prediction skill (verified against observational or reanalysis data) is overall more limited and less robust. Even so, large actual skill is found in the extratropical North Atlantic for SST and in the tropical to subtropical North Pacific for upper-ocean heat content. Results are analyzed with respect to the specific dynamics of the model and the way it is influenced by the nudging. The interplay between initialization and internal modes of variability is also analyzed for sea surface salinity. The study illustrates the importance of two key ingredients both necessary for the success of future coordinated decadal

  2. Effect of Contract Research Organization Bureaucracy in Clinical Trial Management: A Model From Lung Cancer.

    Science.gov (United States)

    Gobbini, Elisa; Pilotto, Sara; Pasello, Giulia; Polo, Valentina; Di Maio, Massimo; Arizio, Francesca; Galetta, Domenico; Petrillo, Patrizia; Chiari, Rita; Matocci, Roberta; Di Costanzo, Alessandro; Di Stefano, Teresa Severina; Aglietta, Massimo; Cagnazzo, Celeste; Sperduti, Isabella; Bria, Emilio; Novello, Silvia

    2018-03-01

    Contract research organization (CRO) support is largely included in clinical trial management, although its effect in terms of time savings and benefit has not yet been quantified. We performed a retrospective multicenter analysis of lung cancer trials to explore differences in term of trial activation timelines and accrual for studies with and without CRO involvement. Results regarding study timelines from feasibility data to first patient enrollment were collected from 7 Italian thoracic oncology departments. The final accruals (screened/enrolled patients) are reported. We considered CRO/sponsor-administered and CRO-free trials according to who was responsible for the management of the crucial setup phases. Of 113 trials, 62 (54.9%) were CRO-administered, 34 (30.1%) were sponsor-administered, and 17 (15.0%) were CRO-free. The median time from feasibility invitation to documentation obtainment was 151 days in the CRO-administered trials versus 128 in the sponsor-administered and 120 in the CRO-free trials. The time from document submission to contract signature was 142 days in the CRO-administered versus 128 in the sponsor-administered and 132 in the CRO-free trials. The time from global accrual opening to first patient enrollment was 247 days for the CRO-administered versus 194 in the sponsor-administered and 151 in the CRO-free trials. No significant differences were observed in terms of the median overall timeline: 21 months in the CRO-administered, 15 in the sponsor-administered, and 18 months in the CRO-free studies (P = .29). Although no statistically significant differences were identified, the results of our analysis support the idea that bureaucratic procedures might require more time in CRO-administered trials than in sponsor-administered and CRO-free studies. This bureaucratic delay could negatively affect Italian patients' screening and enrollment compared with other countries. Copyright © 2017 Elsevier Inc. All rights reserved.

  3. A survey of formal languages for contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom

    2010-01-01

    In this short paper we present the current status on formal languages and models for contracts. By a formal model is meant an unambiguous and rigorous representation of contracts, in order to enable their automatic validation, execution, and analysis — activates that are collectively referred...... to as contract lifecycle management (CLM). We present a set of formalism requirements, which represent features that any ideal contract model should support, based on which we present a comparative survey of existing contract formalisms....

  4. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  5. A computational model of the ionic currents, Ca2+ dynamics and action potentials underlying contraction of isolated uterine smooth muscle.

    Directory of Open Access Journals (Sweden)

    Wing-Chiu Tong

    2011-04-01

    Full Text Available Uterine contractions during labor are discretely regulated by rhythmic action potentials (AP of varying duration and form that serve to determine calcium-dependent force production. We have employed a computational biology approach to develop a fuller understanding of the complexity of excitation-contraction (E-C coupling of uterine smooth muscle cells (USMC. Our overall aim is to establish a mathematical platform of sufficient biophysical detail to quantitatively describe known uterine E-C coupling parameters and thereby inform future empirical investigations of physiological and pathophysiological mechanisms governing normal and dysfunctional labors. From published and unpublished data we construct mathematical models for fourteen ionic currents of USMCs: Ca2+ currents (L- and T-type, Na+ current, an hyperpolarization-activated current, three voltage-gated K+ currents, two Ca2+-activated K+ current, Ca2+-activated Cl current, non-specific cation current, Na+-Ca2+ exchanger, Na+-K+ pump and background current. The magnitudes and kinetics of each current system in a spindle shaped single cell with a specified surface area:volume ratio is described by differential equations, in terms of maximal conductances, electrochemical gradient, voltage-dependent activation/inactivation gating variables and temporal changes in intracellular Ca2+ computed from known Ca2+ fluxes. These quantifications are validated by the reconstruction of the individual experimental ionic currents obtained under voltage-clamp. Phasic contraction is modeled in relation to the time constant of changing [Ca2+]i. This integrated model is validated by its reconstruction of the different USMC AP configurations (spikes, plateau and bursts of spikes, the change from bursting to plateau type AP produced by estradiol and of simultaneous experimental recordings of spontaneous AP, [Ca2+]i and phasic force. In summary, our advanced mathematical model provides a powerful tool to

  6. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  7. Nonlinear observer design for a nonlinear string/cable FEM model using contraction theory

    DEFF Research Database (Denmark)

    Turkyilmaz, Yilmaz; Jouffroy, Jerome; Egeland, Olav

    model is presented in the form of partial differential equations (PDE). Galerkin's method is then applied to obtain a set of ordinary differential equations such that the cable model is approximated by a FEM model. Based on the FEM model, a nonlinear observer is designed to estimate the cable...

  8. Psychological contract breach and outcomes: Combining meta-analysis and structural equation models.

    Science.gov (United States)

    Topa Cantisano, Gabriela; Morales Domínguez, J Francisco; Depolo, Marco

    2008-08-01

    In this study, meta-analytic procedures were used to examine the relationships between psychological contract perceived breach and certain outcome variables, such as organizational commitment, job satisfaction and organizational citizenship behaviours (OCB). Our review of the literature generated 41 independent samples in which perceived breach was used as a predictor of these personal and organizational outcomes. A medium effect size (ES) for desirable outcomes (job satisfaction, organizational commitment, organizational trust, OCB and performance) was obtained (r=-.35). For undesirable outcomes (neglect in role duties and intention to leave), ES were also medium (r=.31). When comparing attitudinal (job satisfaction, organizational commitment, organizational trust) and behavioural outcomes (OCB, neglect in role duties and performance), a stronger ES was found for attitudinal (r=-.24) than for behavioural outcomes (r=-.11). Potential moderator variables were examined, and it was found that they explained only a percentage of variability of primary studies. Structural equation analysis of the pooled meta-analytical correlation matrix indicated that the relationships of perceived breach with satisfaction, OCB, intention to leave and performance are fully mediated by organizational trust and commitment. Results are discussed in order to suggest theoretical and empirical implications.

  9. Agile Contracts

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2014-01-01

    with “endless” re-negotiation of the requirements; you need a more flexible way to develop IS. A new way of coping with many changes is to use an agile development approach and a fixed budget and resources contract. This paper presents an example case. We analyse the case and design a guideline for how......When you have stable and non-ambiguous requirements then a classic contract for IS between a supplier and a public sector institution based on a requirements specification may be well suited. However, if you have to accept many changes or have ambiguous requirements then you may end up...... to implement a fixed budget and resources contract in the public sector. The guideline includes elements to cope with challenges in a tender process such as transparency, criteria for supplier selection, and live assessment of resource skills and capabilities, as well as achieving the flexibility for change...

  10. Turnkey contracts

    International Nuclear Information System (INIS)

    Langetepe, G.

    1977-01-01

    To make energy available economically and in sufficient quantity is a main point for the future of an industrial and more for a developing country. The investment costs and the availability of a power plant and in particular for a nuclear power plant are the most significant factors in the economic operation of the plant. In the phase before signing the contract the essential decisions are made with high influence in the economic operation and the availability of the plant. A turn-key contract offers good possibilities to minimize the risks referring a) the plant quality and functionality, b) the plant investment cost, c) the plant completion date, d) the handling of the licensing procedures, e) the availability of the operation. The lecture mentions the points which are of high influence for a successful erection and operation period and which must be clarified before signing the contract between the buyer and supplier of the plant. (orig./HP) [de

  11. The influence of injection volume and capsular bag contraction on the refractive power of polymer refilled lenses - a finite element modelling simulation study.

    Science.gov (United States)

    Martin, Heiner; Guthoff, Rudolf; Schmitz, Klaus-Peter

    2011-09-01

    Polymer injection into the capsular bag after phakoemulsification is an interesting and promising approach to lens surgery. Safe clinical application of this technique will require an appropriate estimate of the effect of implantation variables on the lens power. This article details the results of finite element investigations into the effects of the injected polymer volume and capsular bag contraction on the resultant lens power and accommodation amplitude. An axisymmetric finite element model was created from literature sources. Polymer injection and the capsular contraction were simulated, and their effect on the lens power was calculated. The simulations show that overfilling during polymer injection leads to a refractive power increase of the lens. Capsular bag contraction also results in a power increase. The calculated accommodative amplitude of the lens is minimally affected by capsular bag contraction but decreases significantly with increased capsular bag stiffness as a result of fibrosis. © 2010 The Authors. Journal compilation © 2010 Acta Ophthalmol.

  12. Energy Performance Contract models for the diffusion of green-manufacturing technologies in China: A stakeholder analysis from SMEs’ perspective

    International Nuclear Information System (INIS)

    Liu, Peng; Zhou, Yuan; Zhou, Dillon K.; Xue, Lan

    2017-01-01

    Small-and-medium-sized enterprises (SMEs) are significant to China's emission reduction programme. This research aims to improve our understanding of the challenge of diffusing green-manufacturing technologies among SMEs in China. Specifically, this study examines the Chinese Government's effort to facilitate reduction of energy consumption among SMEs through Energy Performance Contracts (EPCs) to incentivize domestic manufacturers to adopt energy efficient measures (EEMs) in order to reduce demand for energy and corresponding drop in emissions. The data is gathered from relevant EPC stakeholders in the National Motor Upgrading Demonstration Project and its implementation in Dongguan city, which is based on 30 in-depth interviews and 6 focus group discussions. Using stakeholder analysis, this study finds that guaranteed energy savings model is the favorite model in implementation, given the gained benefits outweigh committed resources, and the control capability overrides possible risks among the two core stakeholders. The outcomes of this study may allow the government to have a clear understanding of stakeholder perception of the different EPC models used in China so the design and deployment of these mechanisms can be improved. - Highlights: • Examine the barriers faced by green technologies when they are promoted to SMEs on a large scale. • Explain why green technology diffusion is thwarted when stakeholders cannot reach compromises. • Find that the guaranteed energy savings model is the best mechanism for upgrading SMEs. • Note that new EPC models and new policies are needed to increase stakeholders’ adoption rate.

  13. Finite element model of intermuscular pressure during isometric contraction of skeletal muscle

    NARCIS (Netherlands)

    Jenkyn, T.R.; Koopman, B.; Huijing, P.A.J.B.M.; Lieber, R.L.; Kaufman, K.R.

    2002-01-01

    The measurement of in vivo intramuscular pressure (IMP) has recently become practical and IMP appears well correlated with muscle tension. A numerical model of skeletal muscle was developed to examine the mechanisms producing IMP. Unipennate muscle is modelled as a two-dimensional material continuum

  14. From single molecule fluctuations to muscle contraction: a Brownian model of A.F. Huxley's hypotheses.

    Directory of Open Access Journals (Sweden)

    Lorenzo Marcucci

    Full Text Available Muscular force generation in response to external stimuli is the result of thermally fluctuating, cyclical interactions between myosin and actin, which together form the actomyosin complex. Normally, these fluctuations are modelled using transition rate functions that are based on muscle fiber behaviour, in a phenomenological fashion. However, such a basis reduces the predictive power of these models. As an alternative, we propose a model which uses direct single molecule observations of actomyosin fluctuations reported in the literature. We precisely estimate the actomyosin potential bias and use diffusion theory to obtain a brownian ratchet model that reproduces the complete cross-bridge cycle. The model is validated by simulating several macroscopic experimental conditions, while its interpretation is compatible with two different force-generating scenarios.

  15. Studies on top-quark Monte Carlo modelling with Sherpa and MG5_aMC@NLO

    CERN Document Server

    The ATLAS collaboration

    2017-01-01

    This note presents the status of recent studies of modern Monte Carlo generator setups for the pair production of top quarks at the LHC. Samples at a center of mass energy of 13 TeV have been generated using MG5_aMC@NLO+Pythia8 at at next-to-leading order and Sherpa 2.2 at next-to-leading order precision in QCD. Results are compared to unfolded ATLAS data. The effects of varying relevant parameters are also presented for Sherpa 2.2.

  16. Analysis of foreign petroleum contracts

    International Nuclear Information System (INIS)

    Moran, S.S.

    1991-01-01

    Most foreign exploration and production contracts are of two basic types: Production-Sharing contracts in which a portion of oil revenues, 'cost oil,' is available to the contractor for recoupment of exploration and production costs with the remainder, 'profit oil,' being shared according to an agreed-upon formula, and the familiar Tax-Royalty contract in which a share of petroleum revenues goes to the host country 'off the top' as royalties, and operating profits are taxed at the going rate. Bottom line splits of profits between host governments and contractors, which are approximately 50-50 in the United States, are typically in the 60-40 to 85-15 range elsewhere, with lower profit shares being offset by the higher volume potential and lower costs that may be associated with less mature exploration areas. Foreign contract qualities can be grossly compared by walking typical field models through the contracts to arrive at the bottom line profit splits. Variations within the contract forms include government participation, sliding scale contract elements, special taxes related to rates of return, etc. Often, contract terms are subject to negotiation and the tradeoffs between contract elements must be understood. Contract life, amortization schedules, fund repatriation, currency exchange rates, and the interaction of foreign and United States tax regimens are among the other factors that must be considered. Final decisions on foreign ventures must combine consideration of contracts, economic projections, hydrocarbon volumes, exploration cost estimates, and the estimated probability of success into an overall project assessment

  17. SPATIO-TEMPORAL MODELING OF AGRICULTURAL YIELD DATA WITH AN APPLICATION TO PRICING CROP INSURANCE CONTRACTS

    Science.gov (United States)

    Ozaki, Vitor A.; Ghosh, Sujit K.; Goodwin, Barry K.; Shirota, Ricardo

    2009-01-01

    This article presents a statistical model of agricultural yield data based on a set of hierarchical Bayesian models that allows joint modeling of temporal and spatial autocorrelation. This method captures a comprehensive range of the various uncertainties involved in predicting crop insurance premium rates as opposed to the more traditional ad hoc, two-stage methods that are typically based on independent estimation and prediction. A panel data set of county-average yield data was analyzed for 290 counties in the State of Paraná (Brazil) for the period of 1990 through 2002. Posterior predictive criteria are used to evaluate different model specifications. This article provides substantial improvements in the statistical and actuarial methods often applied to the calculation of insurance premium rates. These improvements are especially relevant to situations where data are limited. PMID:19890450

  18. A mathematical model for active contraction in healthy and failing myocytes and left ventricles.

    Directory of Open Access Journals (Sweden)

    Li Cai

    Full Text Available Cardiovascular disease is one of the leading causes of death worldwide, in particular myocardial dysfunction, which may lead to heart failure eventually. Understanding the electro-mechanics of the heart will help in developing more effective clinical treatments. In this paper, we present a multi-scale electro-mechanics model of the left ventricle (LV. The Holzapfel-Ogden constitutive law was used to describe the passive myocardial response in tissue level, a modified Grandi-Pasqualini-Bers model was adopted to model calcium dynamics in individual myocytes, and the active tension was described using the Niederer-Hunter-Smith myofilament model. We first studied the electro-mechanics coupling in a single myocyte in the healthy and diseased left ventricle, and then the single cell model was embedded in a dynamic LV model to investigate the compensation mechanism of LV pump function due to myocardial dysfunction caused by abnormality in cellular calcium dynamics. The multi-scale LV model was solved using an in-house developed hybrid immersed boundary method with finite element extension. The predictions of the healthy LV model agreed well with the clinical measurements and other studies, and likewise, the results in the failing states were also consistent with clinical observations. In particular, we found that a low level of intracellular Ca2+ transient in myocytes can result in LV pump function failure even with increased myocardial contractility, decreased systolic blood pressure, and increased diastolic filling pressure, even though they will increase LV stroke volume. Our work suggested that treatments targeted at increased contractility and lowering the systolic blood pressure alone are not sufficient in preventing LV pump dysfunction, restoring a balanced physiological Ca2+ handling mechanism is necessary.

  19. Enhancing Readiness of the Unmanned Aerial Vehicle (UAV) System via Use of Simulation Modeling and Contract Incentives

    National Research Council Canada - National Science Library

    Kasal, Omer

    1999-01-01

    ...) test system of the Turkish Army Command are the failure to address life cycle cost (LCC) considerations during financial resource allocations and the absence of contract reliability incentives...

  20. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  1. Information contraction and extraction by multivariate autoregressive (MAR) modelling. Pt. 2. Dominant noise sources in BWRS

    International Nuclear Information System (INIS)

    Morishima, N.

    1996-01-01

    The multivariate autoregressive (MAR) modeling of a vector noise process is discussed in terms of the estimation of dominant noise sources in BWRs. The discussion is based on a physical approach: a transfer function model on BWR core dynamics is utilized in developing a noise model; a set of input-output relations between three system variables and twelve different noise sources is obtained. By the least-square fitting of a theoretical PSD on neutron noise to an experimental one, four kinds of dominant noise sources are selected. It is shown that some of dominant noise sources consist of two or more different noise sources and have the spectral properties of being coloured and correlated with each other. By diagonalizing the PSD matrix for dominant noise sources, we may obtain an MAR expression for a vector noise process as a response to the diagonal elements(i.e. residual noises) being white and mutually-independent. (Author)

  2. Spherically symmetric models with pressure: separating expansion from contraction and generalizing TOV condition

    CERN Document Server

    Mimoso, José Pedro; Mena, Filipe C

    2010-01-01

    We investigate spherically symmetric perfect fluid spacetimes and discuss the existence and stability of a dividing shell separating expanding and collapsing regions. We perform a 3+1 splitting and obtain gauge invariant conditions relating the intrinsic spatial curvature of the shells to the ADM mass and to a function of the pressure which we introduce and that generalises the Tolman-Oppenheimer-Volkoff equilibrium condition. We analyse the particular cases of the Lema\\^itre-Tolman-Bondi dust models with a cosmological constant as an example of a $\\Lambda$-CDM model and its generalization to contain a central perfect fluid core. These models provide simple, but physically interesting illustrations of our results.

  3. Muscle Contraction.

    Science.gov (United States)

    Sweeney, H Lee; Hammers, David W

    2018-02-01

    SUMMARYMuscle cells are designed to generate force and movement. There are three types of mammalian muscles-skeletal, cardiac, and smooth. Skeletal muscles are attached to bones and move them relative to each other. Cardiac muscle comprises the heart, which pumps blood through the vasculature. Skeletal and cardiac muscles are known as striated muscles, because the filaments of actin and myosin that power their contraction are organized into repeating arrays, called sarcomeres, that have a striated microscopic appearance. Smooth muscle does not contain sarcomeres but uses the contraction of filaments of actin and myosin to constrict blood vessels and move the contents of hollow organs in the body. Here, we review the principal molecular organization of the three types of muscle and their contractile regulation through signaling mechanisms and discuss their major structural and functional similarities that hint at the possible evolutionary relationships between the cell types. Copyright © 2018 Cold Spring Harbor Laboratory Press; all rights reserved.

  4. Separating expansion from contraction: generalized TOV condition, LTB models with pressure and $\\Lambda$CDM

    CERN Document Server

    Delliou, Morgan Le; Mimoso, José Pedro

    2010-01-01

    We discuss the existence of a dividing shell separating expanding and collapsing regions in spherically symmetric solutions with pressure. We obtain gauge invariant conditions relating not only the intrinsic spatial curvature of the shells to the ADM mass, but also a function of the pressure which we introduce that generalises the Tolman-Oppenheimer-Volkoff equilibrium condition, in the framework of a 3+1 spacetime splitting. We consider the particular case of a Lema\\^itre-Tolman-Bondi dust models with a cosmological constant (a $\\Lambda$-CDM model) as an example of our results.

  5. Compositional specification of commercial contracts

    DEFF Research Database (Denmark)

    Andersen, Jesper; Elsborg, Ebbe; Henglein, Fritz

    2006-01-01

    -definable analysis of their state before, during and after execution. We provide several realistic examples of commercial contracts and their analyses. A variety of (real) contracts can be expressed in such a fashion as to support their integration, management and analysis in an operational environment......We present a declarative language for compositional specification of contracts governing the exchange of resources. It extends Eber and Peyton Jones’s declarative language for specifying financial contracts (Jones et al. in The Fun of Programming. 2003) to the exchange of money, goods and services...... amongst multiple parties and complements McCarthy’s Resources, Events and Agents (REA) accounting model (McCarthy in Account Rev. LVII(3), 554–578, 1982) with a view- independent formal contract model that supports definition of user-defined contracts, automatic monitoring under execution and user...

  6. Contract design

    International Nuclear Information System (INIS)

    Bradley, P.

    2006-01-01

    The current state of the electric power industry in Ontario was discussed with particular reference to the procurement of contracts and why the Ontario Power Authority (OPA) must be contracting to resolve many of Ontario's electricity issues. As Ontario increasingly relies on imports and natural gas-fired generation, the price of electricity continues to rise given that supply is at a low level. In addition to the generation gap, there are also several transmission constrained areas in Ontario, particularly in the Greater Toronto Area (GTA). The OPA announced 2 projects totalling 1900 MW to relieve congestion. According to the Independent Electricity System Operator (IESO), the total potential opportunity for new generation by 2015 is about 5,000 to 7,000 megawatts. OPA is expected to launch procurement processes for up to 1000 MW of cogeneration, 250 MW of province-wide conservation initiatives, 1900 MW of generation in the western part of the GTA, and 600 MW of generation in downtown Toronto. New nuclear capacity is also anticipated in addition to renewables and conservation/demand management (CDM) initiatives. The OPA's competitive procurement processes will include requests for expressions of interest, requests for qualifications and requests for proposals. The challenge of balancing the technical complexities and realities of procuring generation assets with the need for a fair procurement process was discussed. Contracts will be designed to react to market signals and will include 3 styles: tariff style, tolling style and standard offer contract. OPA will make every effort to balance generator and ratepayer interests. 6 figs

  7. Development of project management data calculation models relating to dismantling of nuclear facilities. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Sukegawa, Takenori; Ohshima, Soichiro; Shiraishi, Kunio; Yanagihara, Satoshi [Department of Decommissioning and Waste Management, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai Ibaraki (Japan)

    1999-02-01

    Labor-hours necessary for dismantling activities are generally estimated based on experience, for example, as a form of unit productivity factors such as the relationship between labor-hours and weight of components dismantled which were obtained by actual dismantling activities. The project management data calculation models together with unit productivity factors for basic dismantling work activities were developed by analyzing the data obtained from the Japan Power Demonstration Reactor (JPDR) dismantling project, which will be applicable to estimation of labor-hours in various dismantling conditions. Typical work breakdown structures were also prepared by categorizing repeatable basic dismantling work activities for effective planning of dismantling activities. The labor-hours for dismantling the JPDR components and structures were calculated by using the code system for management of reactor decommissioning (COSMARD), in which the work breakdown structures and the calculation models were contained. It was confirmed that the labor-hours could be easily estimated by COSMARD through the calculations. This report describes the labor-hour calculation models and application of these models to COSMARD. (author)

  8. A seasonal model of contracts between a monopsonistic processor and smallholder pepper producers in Costa Rica

    NARCIS (Netherlands)

    Sáenz Segura, F.; Haese, D' M.F.C.; Schipper, R.A.

    2010-01-01

    We model the contractual arrangements between smallholder pepper (Piper nigrum L.) producers and a single processor in Costa Rica. Producers in the El Roble settlement sell their pepper to only one processing firm, which exerts its monopsonistic bargaining power by setting the purchase price of

  9. Small and large animal models in cardiac contraction research: advantages and disadvantages.

    Science.gov (United States)

    Milani-Nejad, Nima; Janssen, Paul M L

    2014-03-01

    The mammalian heart is responsible for not only pumping blood throughout the body but also adjusting this pumping activity quickly depending upon sudden changes in the metabolic demands of the body. For the most part, the human heart is capable of performing its duties without complications; however, throughout many decades of use, at some point this system encounters problems. Research into the heart's activities during healthy states and during adverse impacts that occur in disease states is necessary in order to strategize novel treatment options to ultimately prolong and improve patients' lives. Animal models are an important aspect of cardiac research where a variety of cardiac processes and therapeutic targets can be studied. However, there are differences between the heart of a human being and an animal and depending on the specific animal, these differences can become more pronounced and in certain cases limiting. There is no ideal animal model available for cardiac research, the use of each animal model is accompanied with its own set of advantages and disadvantages. In this review, we will discuss these advantages and disadvantages of commonly used laboratory animals including mouse, rat, rabbit, canine, swine, and sheep. Since the goal of cardiac research is to enhance our understanding of human health and disease and help improve clinical outcomes, we will also discuss the role of human cardiac tissue in cardiac research. This review will focus on the cardiac ventricular contractile and relaxation kinetics of humans and animal models in order to illustrate these differences. © 2013.

  10. Predicting Effects of Tropomyosin Mutations on Cardiac Muscle Contraction through Myofilament Modeling

    Directory of Open Access Journals (Sweden)

    Lorenzo Rakesh Sewanan

    2016-10-01

    Full Text Available Point mutations to the human gene TPM1 have been implicated in the development of both hypertrophic and dilated cardiomyopathies. Such observations have led to studies investigating the link between single residue changes and the biophysical behavior of the tropomyosin molecule. However, the degree to which these molecular perturbations explain the performance of intact sarcomeres containing mutant tropomyosin remains uncertain. Here, we present a modeling approach that integrates various aspects of tropomyosin’s molecular properties into a cohesive paradigm representing their impact on muscle function. In particular, we considered the effects of tropomyosin mutations on (1 persistence length, (2 equilibrium between thin filament blocked and closed regulatory states, and (3 the crossbridge duty cycle. After demonstrating the ability of the new model to capture Ca-dependent myofilament responses during both dynamic and steady-state activation, we used it to capture the effects of hypertrophic cardiomyopathy (HCM related E180G and D175N mutations on skinned myofiber mechanics. Our analysis indicates that the fiber-level effects of the two mutations can be accurately described by a combination of changes to the three tropomyosin properties represented in the model. Subsequently, we used the model to predict mutation effects on muscle twitch. Both mutations led to increased twitch contractility as a consequence of diminished cooperative inhibition between thin filament regulatory units. Overall, simulations suggest that a common twitch phenotype for HCM-linked tropomyosin mutations includes both increased contractility and elevated diastolic tension.

  11. Development of femoral bone fracture model simulating muscular contraction force by pneumatic rubber actuator.

    Science.gov (United States)

    Sen, Shin; Ando, Takehiro; Kobayashi, Etsuko; Miyamoto, Hideaki; Ohashi, Satoru; Tanaka, Sakae; Joung, Sanghyun; Park, Il-Hyung; Sakuma, Ichiro

    2014-01-01

    In femoral fracture reduction, orthopedic surgeons must pull distal bone fragments with great traction force and return them to their correct positions, by referring to 2D-fluoroscopic images. Since this method is physically burdensome, the introduction of robotic assistance is desirable. While such robots have been developed, adequate control methods have not yet been established because of the lack of experimental data. It is difficult to obtain accurate data using cadavers or animals because they are different from the living human body's muscle characteristics and anatomy. Therefore, an experimental model for simulating human femoral characteristics is required. In this research, human muscles are reproduced using a McKibben-type pneumatic rubber actuator (artificial muscle) to develop a model that simulates typical femur muscles using artificial muscles.

  12. Contraction Options and Optimal Multiple-Stopping in Spectrally Negative Lévy Models

    Energy Technology Data Exchange (ETDEWEB)

    Yamazaki, Kazutoshi, E-mail: kyamazak@kansai-u.ac.jp [Kansai University, Department of Mathematics, Faculty of Engineering Science (Japan)

    2015-08-15

    This paper studies the optimal multiple-stopping problem arising in the context of the timing option to withdraw from a project in stages. The profits are driven by a general spectrally negative Lévy process. This allows the model to incorporate sudden declines of the project values, generalizing greatly the classical geometric Brownian motion model. We solve the one-stage case as well as the extension to the multiple-stage case. The optimal stopping times are of threshold-type and the value function admits an expression in terms of the scale function. A series of numerical experiments are conducted to verify the optimality and to evaluate the efficiency of the algorithm.

  13. Aligning drivers, contract, and management of IT-outsourcing relationships: a type-dependent model

    DEFF Research Database (Denmark)

    Arenfeldt, Katrine; Corty Dam, Amalie; Fenger, Kim Harder

    2017-01-01

    In today’s competitive business environment, information technology outsourcing has become a wide-spread reality across all industries and sectors. Researchers have investigated this complex phenomenon from various angles, and established a sound knowledge base regarding the drivers, management......, and success factors related to IT outsourcing. However, little is known about the relationship between outsourcing drivers and goals on the one hand, and contractual and managerial aspects on the other hand. To overcome this gap, this study presents a synthesized conceptual model of existing literature...... that relates aspects of contractual governance and relationship management to three generic types of IT outsourcing, based on their underlying drivers: task-based, process-based, and partnership-based outsourcing. Our model identifies the specific contractual and managerial factors relevant for each type...

  14. Contraction Options and Optimal Multiple-Stopping in Spectrally Negative Lévy Models

    International Nuclear Information System (INIS)

    Yamazaki, Kazutoshi

    2015-01-01

    This paper studies the optimal multiple-stopping problem arising in the context of the timing option to withdraw from a project in stages. The profits are driven by a general spectrally negative Lévy process. This allows the model to incorporate sudden declines of the project values, generalizing greatly the classical geometric Brownian motion model. We solve the one-stage case as well as the extension to the multiple-stage case. The optimal stopping times are of threshold-type and the value function admits an expression in terms of the scale function. A series of numerical experiments are conducted to verify the optimality and to evaluate the efficiency of the algorithm

  15. Coupling biochemistry and mechanics in cell adhesion: a model for inhomogeneous stress fiber contraction

    International Nuclear Information System (INIS)

    Besser, Achim; Schwarz, Ulrich S

    2007-01-01

    Biochemistry and mechanics are closely coupled in cell adhesion. At sites of cell-matrix adhesion, mechanical force triggers signaling through the Rho-pathway, which leads to structural reinforcement and increased contractility in the actin cytoskeleton. The resulting force acts back to the sites of adhesion, resulting in a positive feedback loop for mature adhesion. Here, we model this biochemical-mechanical feedback loop for the special case when the actin cytoskeleton is organized in stress fibers, which are contractile bundles of actin filaments. Activation of myosin II molecular motors through the Rho-pathway is described by a system of reaction-diffusion equations, which are coupled into a viscoelastic model for a contractile actin bundle. We find strong spatial gradients in the activation of contractility and in the corresponding deformation pattern of the stress fiber, in good agreement with experimental findings

  16. A Phenomenological Model and Validation of Shortening Induced Force Depression during Muscle Contractions

    Science.gov (United States)

    McGowan, C.P.; Neptune, R.R.; Herzog, W.

    2009-01-01

    History dependent effects on muscle force development following active changes in length have been measured in a number of experimental studies. However, few muscle models have included these properties or examined their impact on force and power output in dynamic cyclic movements. The goal of this study was to develop and validate a modified Hill-type muscle model that includes shortening induced force depression and assess its influence on locomotor performance. The magnitude of force depression was defined by empirical relationships based on muscle mechanical work. To validate the model, simulations incorporating force depression were developed to emulate single muscle in situ and whole muscle group leg extension experiments. There was excellent agreement between simulation and experimental values, with in situ force patterns closely matching the experimental data (average RMS error pedaling with and without force depression were generated. Force depression decreased maximum crank power by 20% – 40%, depending on the relationship between force depression and muscle work used. These results indicate that force depression has the potential to substantially influence muscle power output in dynamic cyclic movements. However, to fully understand the impact of this phenomenon on human movement, more research is needed to characterize the relationship between force depression and mechanical work in large muscles with different morphologies. PMID:19879585

  17. A Model for Sustainable Building Energy Efficiency Retrofit (BEER) Using Energy Performance Contracting (EPC) Mechanism for Hotel Buildings in China

    Science.gov (United States)

    Xu, Pengpeng

    Hotel building is one of the high-energy-consuming building types, and retrofitting hotel buildings is an untapped solution to help cut carbon emissions contributing towards sustainable development. Energy Performance Contracting (EPC) has been promulgated as a market mechanism for the delivery of energy efficiency projects. EPC mechanism has been introduced into China relatively recently, and it has not been implemented successfully in building energy efficiency retrofit projects. The aim of this research is to develop a model for achieving the sustainability of Building Energy Efficiency Retrofit (BEER) in hotel buildings under the Energy Performance Contracting (EPC) mechanism. The objectives include: • To identify a set of Key Performance Indicators (KPIs) for measuring the sustainability of BEER in hotel buildings; • To identify Critical Success Factors (CSFs) under EPC mechanism that have a strong correlation with sustainable BEER project; • To develop a model explaining the relationships between the CSFs and the sustainability performance of BEER in hotel building. Literature reviews revealed the essence of sustainable BEER and EPC, which help to develop a conceptual framework for analyzing sustainable BEER under EPC mechanism in hotel buildings. 11 potential KPIs for sustainable BEER and 28 success factors of EPC were selected based on the developed framework. A questionnaire survey was conducted to ascertain the importance of selected performance indicators and success factors. Fuzzy set theory was adopted in identifying the KPIs. Six KPIs were identified from the 11 selected performance indicators. Through a questionnaire survey, out of the 28 success factors, 21 Critical Success Factors (CSFs) were also indentified. Using the factor analysis technique, the 21 identified CSFs in this study were grouped into six clusters to help explain project success of sustainable BEER. Finally, AHP/ANP approach was used in this research to develop a model to

  18. Changes in action potentials and intracellular ionic homeostasis in a ventricular cell model related to a persistent sodium current in SCN5A mutations underlying LQT3

    Czech Academy of Sciences Publication Activity Database

    Christé, G.; Chahine, M.; Chevalier, P.; Pásek, Michal

    2008-01-01

    Roč. 96, - (2008), s. 281-293 ISSN 0079-6107 Institutional research plan: CEZ:AV0Z20760514 Keywords : cardiac cell * SCN5A mutation * Long QT syndrome * quantitative modelling Subject RIV: BO - Biophysics Impact factor: 6.388, year: 2008

  19. Parameter and model uncertainty in a life-table model for fine particles (PM2.5): a statistical modeling study.

    Science.gov (United States)

    Tainio, Marko; Tuomisto, Jouni T; Hänninen, Otto; Ruuskanen, Juhani; Jantunen, Matti J; Pekkanen, Juha

    2007-08-23

    The estimation of health impacts involves often uncertain input variables and assumptions which have to be incorporated into the model structure. These uncertainties may have significant effects on the results obtained with model, and, thus, on decision making. Fine particles (PM2.5) are believed to cause major health impacts, and, consequently, uncertainties in their health impact assessment have clear relevance to policy-making. We studied the effects of various uncertain input variables by building a life-table model for fine particles. Life-expectancy of the Helsinki metropolitan area population and the change in life-expectancy due to fine particle exposures were predicted using a life-table model. A number of parameter and model uncertainties were estimated. Sensitivity analysis for input variables was performed by calculating rank-order correlations between input and output variables. The studied model uncertainties were (i) plausibility of mortality outcomes and (ii) lag, and parameter uncertainties (iii) exposure-response coefficients for different mortality outcomes, and (iv) exposure estimates for different age groups. The monetary value of the years-of-life-lost and the relative importance of the uncertainties related to monetary valuation were predicted to compare the relative importance of the monetary valuation on the health effect uncertainties. The magnitude of the health effects costs depended mostly on discount rate, exposure-response coefficient, and plausibility of the cardiopulmonary mortality. Other mortality outcomes (lung cancer, other non-accidental and infant mortality) and lag had only minor impact on the output. The results highlight the importance of the uncertainties associated with cardiopulmonary mortality in the fine particle impact assessment when compared with other uncertainties. When estimating life-expectancy, the estimates used for cardiopulmonary exposure-response coefficient, discount rate, and plausibility require careful

  20. Parameter and model uncertainty in a life-table model for fine particles (PM2.5: a statistical modeling study

    Directory of Open Access Journals (Sweden)

    Jantunen Matti J

    2007-08-01

    Full Text Available Abstract Background The estimation of health impacts involves often uncertain input variables and assumptions which have to be incorporated into the model structure. These uncertainties may have significant effects on the results obtained with model, and, thus, on decision making. Fine particles (PM2.5 are believed to cause major health impacts, and, consequently, uncertainties in their health impact assessment have clear relevance to policy-making. We studied the effects of various uncertain input variables by building a life-table model for fine particles. Methods Life-expectancy of the Helsinki metropolitan area population and the change in life-expectancy due to fine particle exposures were predicted using a life-table model. A number of parameter and model uncertainties were estimated. Sensitivity analysis for input variables was performed by calculating rank-order correlations between input and output variables. The studied model uncertainties were (i plausibility of mortality outcomes and (ii lag, and parameter uncertainties (iii exposure-response coefficients for different mortality outcomes, and (iv exposure estimates for different age groups. The monetary value of the years-of-life-lost and the relative importance of the uncertainties related to monetary valuation were predicted to compare the relative importance of the monetary valuation on the health effect uncertainties. Results The magnitude of the health effects costs depended mostly on discount rate, exposure-response coefficient, and plausibility of the cardiopulmonary mortality. Other mortality outcomes (lung cancer, other non-accidental and infant mortality and lag had only minor impact on the output. The results highlight the importance of the uncertainties associated with cardiopulmonary mortality in the fine particle impact assessment when compared with other uncertainties. Conclusion When estimating life-expectancy, the estimates used for cardiopulmonary exposure

  1. Cognition and Incomplete Contracts

    OpenAIRE

    Tirole, Jean

    2008-01-01

    Thinking about contingencies, designing covenants, and seeing through their implications is costly. Parties to a contract accordingly use heuristics and leave it incomplete. The paper develops a model of limited cognition and examines its consequences for contractual design. (JEL D23, D82, D86, L22)

  2. Validating Timed Component Contracts

    DEFF Research Database (Denmark)

    Le Guilly, Thibaut; Liu, Shaoying; Olsen, Petur

    2015-01-01

    This paper presents a technique for testing software components with contracts that specify functional behavior, synchronization, as well as timing behavior. The approach combines elements from unit testing with model-based testing techniques for timed automata. The technique is implemented...... in an online testing tool, and we demonstrate its use on a concrete use case....

  3. Paleoclimatic modeling and phylogeography of least killifish, Heterandria formosa: insights into Pleistocene expansion-contraction dynamics and evolutionary history of North American Coastal Plain freshwater biota.

    Science.gov (United States)

    Bagley, Justin C; Sandel, Michael; Travis, Joseph; Lozano-Vilano, María de Lourdes; Johnson, Jerald B

    2013-10-09

    Climatic and sea-level fluctuations throughout the last Pleistocene glacial cycle (~130-0 ka) profoundly influenced present-day distributions and genetic diversity of Northern Hemisphere biotas by forcing range contractions in many species during the glacial advance and allowing expansion following glacial retreat ('expansion-contraction' model). Evidence for such range dynamics and refugia in the unglaciated Gulf-Atlantic Coastal Plain stems largely from terrestrial species, and aquatic species Pleistocene responses remain relatively uninvestigated. Heterandria formosa, a wide-ranging regional endemic, presents an ideal system to test the expansion-contraction model within this biota. By integrating ecological niche modeling and phylogeography, we infer the Pleistocene history of this livebearing fish (Poeciliidae) and test for several predicted distributional and genetic effects of the last glaciation. Paleoclimatic models predicted range contraction to a single southwest Florida peninsula refugium during the Last Glacial Maximum, followed by northward expansion. We inferred spatial-population subdivision into four groups that reflect genetic barriers outside this refuge. Several other features of the genetic data were consistent with predictions derived from an expansion-contraction model: limited intraspecific divergence (e.g. mean mtDNA p-distance = 0.66%); a pattern of mtDNA diversity (mean Hd = 0.934; mean π = 0.007) consistent with rapid, recent population expansion; a lack of mtDNA isolation-by-distance; and clinal variation in allozyme diversity with higher diversity at lower latitudes near the predicted refugium. Statistical tests of mismatch distributions and coalescent simulations of the gene tree lent greater support to a scenario of post-glacial expansion and diversification from a single refugium than to any other model examined (e.g. multiple-refugia scenarios). Congruent results from diverse data indicate H. formosa fits the classic Pleistocene

  4. Bayesian Classification Models for Premature Ventricular Contraction Detection on ECG Traces.

    Science.gov (United States)

    Casas, Manuel M; Avitia, Roberto L; Gonzalez-Navarro, Felix F; Cardenas-Haro, Jose A; Reyna, Marco A

    2018-01-01

    According to the American Heart Association, in its latest commission about Ventricular Arrhythmias and Sudden Death 2006, the epidemiology of the ventricular arrhythmias ranges from a series of risk descriptors and clinical markers that go from ventricular premature complexes and nonsustained ventricular tachycardia to sudden cardiac death due to ventricular tachycardia in patients with or without clinical history. The premature ventricular complexes (PVCs) are known to be associated with malignant ventricular arrhythmias and sudden cardiac death (SCD) cases. Detecting this kind of arrhythmia has been crucial in clinical applications. The electrocardiogram (ECG) is a clinical test used to measure the heart electrical activity for inferences and diagnosis. Analyzing large ECG traces from several thousands of beats has brought the necessity to develop mathematical models that can automatically make assumptions about the heart condition. In this work, 80 different features from 108,653 ECG classified beats of the gold-standard MIT-BIH database were extracted in order to classify the Normal, PVC, and other kind of ECG beats. Three well-known Bayesian classification algorithms were trained and tested using these extracted features. Experimental results show that the F1 scores for each class were above 0.95, giving almost the perfect value for the PVC class. This gave us a promising path in the development of automated mechanisms for the detection of PVC complexes.

  5. From Risk Models to Loan Contracts: Austerity as the Continuation of Calculation by Other Means

    Directory of Open Access Journals (Sweden)

    Pierre Pénet

    2014-06-01

    Full Text Available This article analyses how financial actors sought to minimise financial uncertainties during the European sovereign debt crisis by employing simulations as legal instruments of market regulation. We first contrast two roles that simulations can play in sovereign debt markets: ‘simulation-hypotheses’, which work as bundles of constantly updated hypotheses with the goal of better predicting financial risks; and ‘simulation-fictions’, which provide fixed narratives about the present with the purpose of postponing the revision of market risks. Using ratings reports published by Moody’s on Greece and European Central Bank (ECB regulations, we show that Moody’s stuck to a simulationfiction and displayed rating inertia on Greece’s trustworthiness to prevent the destabilising effects that further downgrades would have on Greek borrowing costs. We also show that the multi-notch downgrade issued by Moody’s in June 2010 followed the ECB’s decision to remove ratings from its collateral eligibility requirements. Then, as regulators moved from ‘regulation through model’ to ‘regulation through contract’, ratings stopped functioning as simulation-fictions. Indeed, the conditions of the Greek bailout implemented in May 2010 replaced the CRAs’ models as the main simulation-fiction, which market actors employed to postpone the prospect of a Greek default. We conclude by presenting austerity measures as instruments of calculative governance rather than ideological compacts

  6. A review of the use of the 5 A's model for weight loss counselling: differences between physician practice and patient demand.

    Science.gov (United States)

    Sherson, Elaine A; Yakes Jimenez, Elizabeth; Katalanos, Nikki

    2014-08-01

    The 5 A's (Assess, Advise, Agree, Assist and Arrange) is a model that can be used by primary care physicians and practitioners to promote patient behaviour change. The 5 A's model is a viable intervention for encouraging weight management in response to the epidemic of obesity among patients. To identify and summarize quantitative research related to the 5 A's patients want to receive from their physicians during weight loss discussions and how frequently physicians use each practice. We conducted a systematic literature review of the MEDLINE/PubMed database using relevant keywords. Of 230 articles originally identified, 15 articles included quantitative research data from cross-sectional studies related to the aim of this review. Based on the available evidence, the majority of patients want to discuss weight loss with their physicians, with the Assist and Arrange aspects of the 5 A's being most desired. However, physicians most frequently Advise and Assess, and rarely Agree, Assist or Arrange. There are some significant limitations to the available evidence, including a limited number of studies addressing patient preference, inconsistent assessment of all aspects of the 5 A's, a lack of longitudinal designs and failure to take contextual factors such as patient and physician characteristics into account when interpreting study results. Future studies should address these limitations, document the outcomes that result from better physician training in lifestyle modification strategies and determine how to best routinely implement all aspects of the 5 A's for weight management in family practice settings. © The Author 2014. Published by Oxford University Press. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  7. Pathophysiological mechanisms of sino-atrial dysfunction and ventricular conduction disease associated with SCN5A deficiency: insights from mouse models

    Directory of Open Access Journals (Sweden)

    Christopher L-H Huang

    2012-07-01

    Full Text Available Genetically modified mice provide a number of models for studying cardiac channelopathies related to cardiac Na+ channel (SCN5A abnormalities. We review key pathophysiological features in these murine models that may underlie clinical features observed in sinus node dysfunction and progressive cardiac conduction disease, thereby providing insights into their pathophysiological mechanisms. We describe loss of Na+ channel function and fibrotic changes associated with both loss and gain-of-function Na+ channel mutations. Recent reports further relate the progressive fibrotic changes to upregulation of TGF-β1 production and the transcription factors, Atf3, a stress-inducible gene, and Egr1, to the presence of heterozygous Scn5a inactivation. Both changes are thus directly implicated in the clinically observed disruptions in sino-atrial node pacemaker function, and sino-atrial and ventricular conduction, and their progression with age. Murine systems with genetic modifications in Scn5a thus prove a useful tool to address questions concerning roles of genetic and environmental modifiers on human SCN5A disease phenotypes.

  8. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  9. Towards Certified Management of Financial Contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2014-01-01

    . The seminal work by Peyton-Jones and Eber on financial contracts shows how an algebraic approach to contract specification can be used for valuation of contracts (when combined with a model of the underlying observables) and for managing how contracts evolve under so-called fixings and decision......-taking, with the contracts eventually evaporating into the empty contract, for which no party have further obligations. The ideas have emerged into Eber's company LexiFi, which has become a leading software provider for a range of financial institutions, with all contract management operations centralised around a domain......Banks and financial institutions nowadays often use domain-specific languages (DSLs) for describing complex financial contracts, in particular, for specifying how asset transfers for a specific contract depend on underlying observables, such as interest rates, currency rates, and stock prices...

  10. Computer modeling of siRNA knockdown effects indicates an essential role of the Ca2+ channel alpha2delta-1 subunit in cardiac excitation-contraction coupling.

    Science.gov (United States)

    Tuluc, Petronel; Kern, Georg; Obermair, Gerald J; Flucher, Bernhard E

    2007-06-26

    L-type Ca(2+) currents determine the shape of cardiac action potentials (AP) and the magnitude of the myoplasmic Ca(2+) signal, which regulates the contraction force. The auxiliary Ca(2+) channel subunits alpha(2)delta-1 and beta(2) are important regulators of membrane expression and current properties of the cardiac Ca(2+) channel (Ca(V)1.2). However, their role in cardiac excitation-contraction coupling is still elusive. Here we addressed this question by combining siRNA knockdown of the alpha(2)delta-1 subunit in a muscle expression system with simulation of APs and Ca(2+) transients by using a quantitative computer model of ventricular myocytes. Reconstitution of dysgenic muscle cells with Ca(V)1.2 (GFP-alpha(1C)) recapitulates key properties of cardiac excitation-contraction coupling. Concomitant depletion of the alpha(2)delta-1 subunit did not perturb membrane expression or targeting of the pore-forming GFP-alpha(1C) subunit into junctions between the outer membrane and the sarcoplasmic reticulum. However, alpha(2)delta-1 depletion shifted the voltage dependence of Ca(2+) current activation by 9 mV to more positive potentials, and it slowed down activation and inactivation kinetics approximately 2-fold. Computer modeling revealed that the altered voltage dependence and current kinetics exert opposing effects on the function of ventricular myocytes that in total cause a 60% prolongation of the AP and a 2-fold increase of the myoplasmic Ca(2+) concentration during each contraction. Thus, the Ca(2+) channel alpha(2)delta-1 subunit is not essential for normal Ca(2+) channel targeting in muscle but is a key determinant of normal excitation and contraction of cardiac muscle cells, and a reduction of alpha(2)delta-1 function is predicted to severely perturb normal heart function.

  11. Contract models for public power distribution; Modeles de documents contractuels pour la distribution publique d'electricite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This document gathers several models of contractual documents relative to the public distribution of electricity: grant conventions (for towns syndicate or for a single town), grant technical specifications (general dispositions, works relative to the granted network, services to users, tariffing, grant completion, various dispositions, local modalities between the granting authority and the grantee, third party participation to connection costs, electricity purchase and sale prices, general delivery conditions for low-power deliveries. (J.S.)

  12. Contractions of quantum algebraic structures

    International Nuclear Information System (INIS)

    Doikou, A.; Sfetsos, K.

    2010-01-01

    A general framework for obtaining certain types of contracted and centrally extended algebras is reviewed. The whole process relies on the existence of quadratic algebras, which appear in the context of boundary integrable models. (Abstract Copyright [2010], Wiley Periodicals, Inc.)

  13. Comment on "An Assessment of the ICE-6G_C (VM5a) Glacial Isostatic Adjustment Model" by Purcell et al.

    Science.gov (United States)

    Richard Peltier, W.; Argus, Donald F.; Drummond, Rosemarie

    2018-02-01

    The most recently published model of the glacial isostatic adjustment process in the ICE-NG (VMX) sequence from the University of Toronto, denoted ICE-6G_C (VM5a), was originally developed to degree and order 256 in spherical harmonics and has been shown to provide accurate fits to a voluminous database of GPS observations from North America, Eurasia, and Antarctica, to time dependent gravity data being provided by the GRACE satellites, and to radiocarbon-dated relative sea level histories through the Holocene epoch. The authors of the Purcell et al. (2016, https://doi.org/10.1002/2015JB012742) paper have suggested this model to be flawed. We have produced a further version of our model, denoted ICE-6G_D (VM5a), by employing the same BEDMAP2 bathymetry for the Southern Ocean as employed in their analysis which has somewhat reduced the differences between our results. However, significant physically important differences remain, including the magnitude of present-day vertical crustal motion in the embayments and in the spectrum of Stokes coefficients for present-day geoid height time dependence which continues to "flatten" at high spherical harmonic degree. We explore the reasons for these differences and trace them to the use by Purcell et al. of a loading history for the embayments that differs significantly from that tabulated for both the original and modified versions of our model.

  14. Choreography Synthesis as Contract Agreement

    Directory of Open Access Journals (Sweden)

    Julien Lange

    2013-10-01

    Full Text Available We propose a formal model for distributed systems, where each participant advertises its requirements and obligations as behavioural contracts, and where multiparty sessions are started when a set of contracts allows to synthesise a choreography. Our framework is based on the CO2 calculus for contract-oriented computing, and borrows concepts and results from the session type literature. It supports sessions where the number of participants is not determined beforehand, and keeps CO2's ability to rule out participants that are culpable if contracts are not fulfilled at runtime. We show that we have progress and session fidelity in CO2, as a result of the honesty of participants — i.e., their ability to always adhere to their contracts.

  15. Analysis of international oil and gas contracts

    International Nuclear Information System (INIS)

    Moran, S.

    1992-01-01

    The purposes of this paper are to describe the main types of international petroleum contracts, to give the reader methods for comparing contract qualities and analyzing the profitability of petroleum field models under basic contract terms, to describe methods for assessing tradeoffs between various terms of a contract, to describe briefly U.S. Taxation of international petroleum extraction income, and to discuss certain special considerations that apply to the international arena

  16. Optimal Long-term Contracting with Learning

    OpenAIRE

    Jianfeng Yu; Bin Wei; Zhiguo He

    2012-01-01

    This paper introduces profitability uncertainty into an infinite-horizon variation of the classic Holmstrom and Milgrom (1987) model, and studies optimal dynamic contracting with endogenous learning. The agent's potential belief manipulation leads to the hidden information problem, which makes incentive provisions intertemporally linked in the optimal contract. We reduce the contracting problem into a dynamic programming problem with one state variable, and characterize the optimal contract w...

  17. The Infernal Business of Contract Cheating: Understanding the Business Processes and Models of Academic Custom Writing Sites

    Science.gov (United States)

    Ellis, Cath; Zucker, Ian Michael; Randall, David

    2018-01-01

    While there is growing awareness of the existence and activities of Academic Custom Writing websites, which form a small part of the contract cheating industry, how they work remains poorly understood. Very little research has been done on these sites, probably because it has been assumed that it is impossible to see behind their firewalls and…

  18. Exposure to Radiofrequency Radiation Emitted from Common Mobile Phone Jammers Alters the Pattern of Muscle Contractions: an Animal Model Study

    Directory of Open Access Journals (Sweden)

    Rafati A.

    2015-09-01

    Full Text Available Introduction: The rapid growth of wireless communication technologies has caused public concerns regarding the biological effects of electromagnetic radiations on human health. Some early reports indicated a wide variety of non-thermal effects of electromagnetic radiation on amphibians such as the alterations of the pattern of muscle extractions. This study is aimed at investigating the effects of exposure to radiofrequency (RF radiation emitted from mobile phone jammers on the pulse height of contractions, the time interval between two subsequent contractions and the latency period of frog’s isolated gastrocnemius muscle after stimulation with single square pulses of 1V (1 Hz. Materials and Methods: Frogs were kept in plastic containers in a room. Animals in the jammer group were exposed to radiofrequency (RF radiation emitted from a common Jammer at a distance of 1m from the jammer’s antenna for 2 hours while the control frogs were only sham exposed. Then animals were sacrificed and isolated gastrocnemius muscles were exposed to on/off jammer radiation for 3 subsequent 10 minute intervals. Isolated gastrocnemius muscles were attached to the force transducer with a string. Using a PowerLab device (26-T, the pattern of muscular contractions was monitored after applying single square pulses of 1V (1 Hz as stimuli. Results: The findings of this study showed that the pulse height of muscle contractions could not be affected by the exposure to electromagnetic fields. However, the latency period was effectively altered in RF-exposed samples. However, none of the experiments could show an alteration in the time interval between two subsequent contractions after exposure to electromagnetic fields. Conclusion: These findings support early reports which indicated a wide variety of non-thermal effects of electromagnetic radiation on amphibians including the effects on the pattern of muscle extractions.

  19. Exposure to Radiofrequency Radiation Emitted from Common Mobile Phone Jammers Alters the Pattern of Muscle Contractions: an Animal Model Study.

    Science.gov (United States)

    Rafati, A; Rahimi, S; Talebi, A; Soleimani, A; Haghani, M; Mortazavi, S M J

    2015-09-01

    The rapid growth of wireless communication technologies has caused public concerns regarding the biological effects of electromagnetic radiations on human health. Some early reports indicated a wide variety of non-thermal effects of electromagnetic radiation on amphibians such as the alterations of the pattern of muscle extractions. This study is aimed at investigating the effects of exposure to radiofrequency (RF) radiation emitted from mobile phone jammers on the pulse height of contractions, the time interval between two subsequent contractions and the latency period of frog's isolated gastrocnemius muscle after stimulation with single square pulses of 1V (1 Hz). Frogs were kept in plastic containers in a room. Animals in the jammer group were exposed to radiofrequency (RF) radiation emitted from a common Jammer at a distance of 1m from the jammer's antenna for 2 hours while the control frogs were only sham exposed. Then animals were sacrificed and isolated gastrocnemius muscles were exposed to on/off jammer radiation for 3 subsequent 10 minute intervals. Isolated gastrocnemius muscles were attached to the force transducer with a string. Using a PowerLab device (26-T), the pattern of muscular contractions was monitored after applying single square pulses of 1V (1 Hz) as stimuli. The findings of this study showed that the pulse height of muscle contractions could not be affected by the exposure to electromagnetic fields. However, the latency period was effectively altered in RF-exposed samples. However, none of the experiments could show an alteration in the time interval between two subsequent contractions after exposure to electromagnetic fields. These findings support early reports which indicated a wide variety of non-thermal effects of electromagnetic radiation on amphibians including the effects on the pattern of muscle extractions.

  20. Application of linear and non-linear low-Re k-ε models in two-dimensional predictions of convective heat transfer in passages with sudden contractions

    International Nuclear Information System (INIS)

    Raisee, M.; Hejazi, S.H.

    2007-01-01

    This paper presents comparisons between heat transfer predictions and measurements for developing turbulent flow through straight rectangular channels with sudden contractions at the mid-channel section. The present numerical results were obtained using a two-dimensional finite-volume code which solves the governing equations in a vertical plane located at the lateral mid-point of the channel. The pressure field is obtained with the well-known SIMPLE algorithm. The hybrid scheme was employed for the discretization of convection in all transport equations. For modeling of the turbulence, a zonal low-Reynolds number k-ε model and the linear and non-linear low-Reynolds number k-ε models with the 'Yap' and 'NYP' length-scale correction terms have been employed. The main objective of present study is to examine the ability of the above turbulence models in the prediction of convective heat transfer in channels with sudden contraction at a mid-channel section. The results of this study show that a sudden contraction creates a relatively small recirculation bubble immediately downstream of the channel contraction. This separation bubble influences the distribution of local heat transfer coefficient and increases the heat transfer levels by a factor of three. Computational results indicate that all the turbulence models employed produce similar flow fields. The zonal k-ε model produces the wrong Nusselt number distribution by underpredicting heat transfer levels in the recirculation bubble and overpredicting them in the developing region. The linear low-Re k-ε model, on the other hand, returns the correct Nusselt number distribution in the recirculation region, although it somewhat overpredicts heat transfer levels in the developing region downstream of the separation bubble. The replacement of the 'Yap' term with the 'NYP' term in the linear low-Re k-ε model results in a more accurate local Nusselt number distribution. Moreover, the application of the non-linear k

  1. Water and Muscle Contraction

    Directory of Open Access Journals (Sweden)

    Enrico Grazi

    2008-08-01

    Full Text Available The interaction between water and the protein of the contractile machinery as well as the tendency of these proteins to form geometrically ordered structures provide a link between water and muscle contraction. Protein osmotic pressure is strictly related to the chemical potential of the contractile proteins, to the stiffness of muscle structures and to the viscosity of the sliding of the thin over the thick filaments. Muscle power output and the steady rate of contraction are linked by modulating a single parameter, a viscosity coefficient. Muscle operation is characterized by working strokes of much shorter length and much quicker than in the classical model. As a consequence the force delivered and the stiffness attained by attached cross-bridges is much larger than usually believed.

  2. Employment contract and insecurity jobs: asymmetric information modelling of atypical situation, case of poor and less developed countries

    OpenAIRE

    El Bouhadi, Abdelhamid

    2006-01-01

    Our aim in this paper is dedicated to study the relations of recruiting among the employee and the employer in a frame characterized by the insecurity conditions of job and large scale of unemployment. The recruiting relationship that we will study is atypical as far as the offered salary is not a fixed minimum wage. The hiring contract between the employer and the employee in the developing labour markets is made with different conditions regarding to others, mainly in the developed countrie...

  3. Evaluation of the effectiveness of a WHO-5A model based comprehensive tobacco control program among migrant workers in Guangdong, China: a pilot study.

    Science.gov (United States)

    Chai, Wenxin; Zou, Guanyang; Shi, Jingrong; Chen, Wen; Gong, Xiao; Wei, Xiaolin; Ling, Li

    2018-02-27

    As a vulnerable population in China, migrant workers have a higher smoking rate than the general population. This study aims to assess the effectiveness of a WHO-5A based comprehensive tobacco control program in workplaces aggregated with migrants. Using a controlled before and after design, four purposely selected manufacturing factories were assigned to either intervention or control groups. Participants in the intervention arm received adapted 5A group counseling regularly supported by social-media and traditional health education approaches. The primary outcome was the change of smoking rate based on salivary cotinine concentration at three-month follow-up as compared to the control arm. Secondary outcomes were changes in smoking-related knowledge and attitudes assessed using questionnaires. Difference-in-differences approach (DID) and generalized estimating equations (GEE) models were used to conduct the effectiveness analysis. 149 and 166 workers were enrolled in the intervention and control arm respectively. The multiple imputed and adjusted GEE models demonstrated that, compared to those in the control arm, participants in the intervention arm had nearly 2.4 times odds of improving smoking-related knowledge (OR = 2.40, 95% CI = 1.32-4.36, P = 0.02) and three times the odds of improving smoking-related attitude (OR = 3.07, 95% CI = 1.28-7.41, P = 0.03). However, no significant difference was found regarding the change of smoking rate between the two arms (P > 0.05). The regression analysis showed that attendance at the 5A group counseling sections was an important determinant of stopping smoking or improving smoking-related knowledge and attitudes in the intervention group. This WHO-5A comprehensive intervention was effective in improving migrant workers' knowledge of smoking and anti-smoking attitudes. A large-scale, long-term trial is recommended to determine the effectiveness of this intervention. ChiCTR-OPC-17011637 at Chinese

  4. Glacial Isostatic Adjustment Derived Boundary Conditions for Paleoclimate Simulation: the Refined ICE-6G_D (VM5a) Model and the Dansgaard-Oeschger Oscillation

    Science.gov (United States)

    Peltier, W. R.; Vettoretti, G.; Argus, D. F.

    2017-12-01

    Global models of the glacial isostatic adjustment (GIA) process are designed to fit a wide range of geophysical and geomorphological observations that simultaneously constrain the internal viscoelastic structure of Earths interior and the history of grounded ice thickness variations that has occurred over the most recent ice-age cycle of the Late Quaternary interval of time. The most recent refinement of the ICE-NG (VMX) series of such global models from the University of Toronto, ICE-6G_C (VM5a), has recently been slightly modified insofar as its Antarctic component is concerned to produce a "_D" version of the structure. This has been chosen to provide the boundary conditions for the next round of model-data inter-comparisons in the context of the international Paleoclimate Modeling Inter-comparison Project (PMIP). The output of PMIP will contribute to the Sixth Assessment Report (AR6) of the Intergovernmental Panel on Climate Change which is now under way. A highly significant test of the utility of this latest model has recently been performed that is focused upon the Dansgaard-Oeschger oscillation that was the primary source of climate variability during Marine Isotope Stage 3 (MIS3) of the most recent glacial cycle. By introducing the surface boundary conditions for paleotopography and paleobathymetry, land-sea mask and surface albedo into the NCAR CESM1 coupled climate model configured at full one degree by one degree CMIP5 resolution, together with the appropriate trace gas and orbital insolation forcing, we show that the millennium timescale Dansgard-Oeschger oscillation naturally develops following spin- up of the model into the glacial state.

  5. Contractions of affine spherical varieties

    International Nuclear Information System (INIS)

    Arzhantsev, I V

    1999-01-01

    The language of filtrations and contractions is used to describe the class of G-varieties obtainable as the total spaces of the construction of contraction applied to affine spherical varieties, which is well-known in invariant theory. These varieties are local models for arbitrary affine G-varieties of complexity 1 with a one-dimensional categorical quotient. As examples, reductive algebraic semigroups and three-dimensional SL 2 -varieties are considered

  6. On the Dogmatics of Contract Interpretation

    Institute of Scientific and Technical Information of China (English)

    Yang Guoqing

    2017-01-01

    The interpretation of contract has attracted much attention in the practice of contract law and the basic problems to be solved are what the parties agree on and how to set up the rules of adjudication. The present domestic studies are not conducive to contract prac-tices because they either unnecessarily elevate scientific problems to the speculative realm of fantasy, or make the problems become more unreal and abstract. The two traditional theories of contract interpretation do not conflict in values in terms of the autonomy of the will and trust protection. However, in today' s society where cultural pluralism and legal value plural-ism exist, because of different contract practices, differentiation and individualization of con-tract interpretation will become the basic patterns. Therefore, it is impossible and unnecessary to construct a unitary model, but it is of great significance to introduce the dogmatics-orien-ted contract interpretation.

  7. Study of impacts of physical contracts and financial contracts on bidding strategies of GENCOs

    International Nuclear Information System (INIS)

    Xiaoling Chen; He, Y.; Song, Y.H.

    2004-01-01

    This paper studies the impacts of physical contracts and financial contracts on the bidding strategies of GENCOs, including Physical Bilateral Contracts, Contracts for Difference (CfDs), Call Options and Put Options under discriminatory pricing mechanism. The integrated bidding decision model is applied, which has three main modules - probabilistic local marginal price simulator, market-oriented unit commitment model and multi-criteria decision system. The numerical results show that the GENCO will choose different bidding strategies if it holds different types of contract. The results also suggest that CfDs have the best performance for risk alleviation. (author)

  8. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  9. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  10. From Orchestration to Choreography through Contract Automata

    Directory of Open Access Journals (Sweden)

    Davide Basile

    2014-10-01

    Full Text Available We study the relations between a contract automata and an interaction model. In the former model, distributed services are abstracted away as automata - oblivious of their partners - that coordinate with each other through an orchestrator. The interaction model relies on channel-based asynchronous communication and choreography to coordinate distributed services. We define a notion of strong agreement on the contract model, exhibit a natural mapping from the contract model to the interaction model, and give conditions to ensure that strong agreement corresponds to well-formed choreography.

  11. Formal and relational contracts between organizations: proposal of a model for analysis of the transactional and governance structure characteristics of comparative cases

    Directory of Open Access Journals (Sweden)

    Luciana Cardoso Siqueira Ambrozini

    Full Text Available Abstract The literature indicates that the use of formal and relational governance structures have a fundamental role in the conduct and maintenance of inter-organizational relationships. Nevertheless, there are possibilities for discussions about the composition and function of these structures in the presence of different transactional characteristics. Thus, a model based on the literatures of formal contracts, inter-organizational relationships, Relational Contract Theory, and Transaction Cost Economics is proposed. Since this is a qualitative exploratory research, six structured interviews were carried out and interpreted by means of Content Analysis for case comparison and discussion of theoretical propositions. It was observed that some transactional characteristics, when present with greater intensity in the context of a transaction, tend to corroborate the theoretical propositions of formal contractual function, demonstrating that the intensity of these characteristics is a relevant factor for analyzing the adequacy of governance structures. Likewise, the use of different relational norms presents variations within each characteristic analyzed. Other aspects explored in the Content Analysis are suggested in the composition of the analysis model. The propositions explored regarding the composition of the transaction context and the complementarity of governance structure of inter-organizational relationships are also discussed.

  12. Contractibility of curves

    Directory of Open Access Journals (Sweden)

    Janusz Charatonik

    1991-11-01

    Full Text Available Results concerning contractibility of curves (equivalently: of dendroids are collected and discussed in the paper. Interrelations tetween various conditions which are either sufficient or necessary for a curve to be contractible are studied.

  13. Concept of contracting authority

    OpenAIRE

    Kasiliauskaitė, Vitalija

    2016-01-01

    Concept of Contracting Authority Law on Public Procurement the procurement concept implies the conclusion that public procurement be declared only such purchases are carried out by the contracting authority. The contracting authorities can be a subject of state and municipal management institutes, whose assignment authority is determined by a functional approach. Also, contracting authorities may be public and legal entities, but that the public interest and operates non-commercial activities...

  14. Inflation Forecast Contracts

    OpenAIRE

    Gersbach, Hans; Hahn, Volker

    2012-01-01

    We introduce a new type of incentive contract for central bankers: inflation forecast contracts, which make central bankers’ remunerations contingent on the precision of their inflation forecasts. We show that such contracts enable central bankers to influence inflation expectations more effectively, thus facilitating more successful stabilization of current inflation. Inflation forecast contracts improve the accuracy of inflation forecasts, but have adverse consequences for output. On balanc...

  15. The Lanthanide Contraction Revisited

    Energy Technology Data Exchange (ETDEWEB)

    Seitz, Michael; Oliver, Allen G.; Raymond, Kenneth N.

    2007-04-19

    A complete, isostructural series of lanthanide complexes (except Pm) with the ligand TREN-1,2-HOIQO has been synthesized and structurally characterized by means of single-crystal X-ray analysis. All complexes are 1D-polymeric species in the solid state, with the lanthanide being in an eight-coordinate, distorted trigonal-dodecahedral environment with a donor set of eight unique oxygen atoms. This series constitutes the first complete set of isostructural lanthanide complexes with a ligand of denticity greater than two. The geometric arrangement of the chelating moieties slightly deviates across the lanthanide series, as analyzed by a shape parameter metric based on the comparison of the dihedral angles along all edges of the coordination polyhedron. The apparent lanthanide contraction in the individual Ln-O bond lengths deviates considerably from the expected quadratic decrease that was found previously in a number of complexes with ligands of low denticity. The sum of all bond lengths around the trivalent metal cation, however, is more regular, showing an almost ideal quadratic behavior across the entire series. The quadratic nature of the lanthanide contraction is derived theoretically from Slater's model for the calculation of ionic radii. In addition, the sum of all distances along the edges of the coordination polyhedron show exactly the same quadratic dependency as the Ln-X bond lengths. The universal validity of this coordination sphere contraction, concomitant with the quadratic decrease in Ln-X bond lengths, was confirmed by reexamination of four other, previously published, almost complete series of lanthanide complexes. Due to the importance of multidentate ligands for the chelation of rare-earth metals, this result provides a significant advance for the prediction and rationalization of the geometric features of the corresponding lanthanide complexes, with great potential impact for all aspects of lanthanide coordination.

  16. Teaching about Contracts.

    Science.gov (United States)

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  17. Contract law as fairness

    NARCIS (Netherlands)

    Klijnsma, J.

    2015-01-01

    This article examines the implications for contract law of Rawls' theory of justice as fairness. It argues that contract law as an institution is part of the basic structure of society and as such subject to the principles of justice. Discussing the basic structure in relation to contract law is

  18. 3 CFR - Government Contracting

    Science.gov (United States)

    2010-01-01

    ... contract oversight could reduce such sums significantly. Government outsourcing for services also raises... a risk that taxpayer funds will be spent on contracts that are wasteful, inefficient, subject to... mission. In such cases, the agency must ensure that the risks associated with noncompetitive contracts are...

  19. Contracting for nuclear fuels

    International Nuclear Information System (INIS)

    Schuessler, C.M.

    1981-10-01

    This paper deals with uranium sales contracts, i.e. with contractual arrangements in the first steps of the fuel cycle, which cover uranium production and conversion. The various types of contract are described and, where appropriate, their underlying business philosophy and their main terms and conditions. Finally, the specific common features of such contracts are reviewed. (NEA) [fr

  20. Other enrichment related contracts

    International Nuclear Information System (INIS)

    Hall, J.C.

    1978-01-01

    In addition to long-term enrichment contracts, DOE has other types of contracts: (1) short-term, fixed-commitment enrichment contract; (2) emergency sales agreement for enriched uranium; (3) feed material lease agreement; (4) enriched uranium storage agreement; and (5) feed material usage agreement

  1. Contract Monitoring in Agent-Based Systems: Case Study

    Science.gov (United States)

    Hodík, Jiří; Vokřínek, Jiří; Jakob, Michal

    Monitoring of fulfilment of obligations defined by electronic contracts in distributed domains is presented in this paper. A two-level model of contract-based systems and the types of observations needed for contract monitoring are introduced. The observations (inter-agent communication and agents’ actions) are collected and processed by the contract observation and analysis pipeline. The presented approach has been utilized in a multi-agent system for electronic contracting in a modular certification testing domain.

  2. Post-injury stretch promotes recovery in a rat model of muscle damage induced by lengthening contractions.

    Science.gov (United States)

    Mori, Tomohiro; Agata, Nobuhide; Itoh, Yuta; Inoue-Miyazu, Masumi; Mizumura, Kazue; Sokabe, Masahiro; Taguchi, Toru; Kawakami, Keisuke

    2017-06-30

    We investigated the cellular mechanisms and therapeutic effect of post-injury stretch on the recovery process from muscle injury induced by lengthening contractions (LC). One day after LC, a single 15-min bout of muscle stretch was applied at an intensity of 3 mNm. The maximal isometric torque was measured before and at 2-21 days after LC. The myofiber size was analyzed at 21 days after LC. Developmental myosin heavy chain-immunoreactive (dMHC-ir) cells, a marker of regenerating myofibers, were observed in the early recovery stage (2-5 days after LC). We observed that LC-induced injury markedly decreased isometric torque and myofiber size, which recovered faster in rats that underwent stretch than in rats that did not. Regenerating myofiber with dMHC-ir cells was observed earlier in rats that underwent stretch. These results indicate that post-injury stretch may facilitate the regeneration and early formation of new myofibers, thereby promoting structural and functional recovery from LC-induced muscle injury.

  3. IMPACTT5A model : enhancements and modifications since December 1994 with special reference to the effect of tripled-fuel-economy vehicles on fuel-cycle energy and emissions

    Science.gov (United States)

    1998-09-01

    Version 5A of the Integrated Market Penetration and Anticipated Cost of Transportation Technologies (IMPACIT5A) model is a spreadsheet-based set of algorithms that calculates the effects of advanced-technology vehicles on baseline fuel use and emi...

  4. Duration in Production Contracts

    OpenAIRE

    MacDonald, James M.; Korb, Penelope J.

    2006-01-01

    We use 2003 and 2004 ARMS data to analyze variations in contract duration among growers of broilers who hold production contracts. Most contracts cover just a single flock, but many extend for 1-2 years, and a significant minority of broiler contracts specify lengths of 5, 10, and even 15 years. We find that grower debt and production volume are inversely related to the choice of a short term (a year or less) contract, while lengthy prior experience with the contractor promotes short term con...

  5. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    . An opportunity the member states should consider using when procuring a PPP. This paper looks at the negotiation and contracting of a PPP in an economic theoretical and EU public procurement perspective and discusses how to establish an efficient PPP contract under a strong public law doctrine. Governments......This paper concerns Public Private Partnership (PPP) contracts in concern to the coming new 2014/24IEU public procurement directive. The new EU public procurement directive gives the public authority the opportunity to negotiate PPPs much more when they are implemented in national law...... procurement law. Furthermore, the paper seeks to establish a connection between public law, private law and the efficient PPP contract by drawing upon economic theory and empirical contract data from UK, US and Danish partnering contracts from the construction industry and the aim of contracting joint utility...

  6. The numerical modeling of water/FMWCNT nanofluid flow and heat transfer in a backward-facing contracting channel

    Science.gov (United States)

    Alrashed, Abdullah A. A. A.; Akbari, Omid Ali; Heydari, Ali; Toghraie, Davood; Zarringhalam, Majid; Shabani, Gholamreza Ahmadi Sheikh; Seifi, Ali Reza; Goodarzi, Marjan

    2018-05-01

    In recent years, the study of rheological behavior and heat transfer of nanofluids in the industrial equipment has become widespread among the researchers and their results have led to great advancements in this field. In present study, the laminar flow and heat transfer of water/functional multi-walled carbon nanotube nanofluid have been numerically investigated in weight percentages of 0.00, 0.12 and 0.25 and Reynolds numbers of 1-150 by using finite volume method (FVM). The analyzed geometry is a two-dimensional backward-facing contracting channel and the effects of various weight percentages and Reynolds numbers have been studied in the supposed geometry. The results have been interpreted as the figures of Nusselt number, friction coefficient, pressure drop, velocity contours and static temperature. The results of this research indicate that, the enhancement of Reynolds number or weight percentage of nanoparticles causes the reduction of surface temperature and the enhancement of heat transfer coefficient. By increasing Reynolds number, the axial velocity enhances, causing the enhancement of momentum. By increasing fluid momentum at the beginning of channel, especially in areas close to the upper wall, the axial velocity reduces and the possibility of vortex generation increases. The mentioned behavior causes a great enhancement in velocity gradients and pressure drop at the inlet of channel. Also, in these areas, Nusselt number and local friction coefficient figures have a relative decline, which is due to the sudden reduction of velocity. In general, by increasing the mass fraction of solid nanoparticles, the average Nusselt number increases and in Reynolds number of 150, the enhancement of pumping power and pressure drop does not cause any significant changes. This behavior is an important advantage of choosing nanofluid which causes the enhancement of thermal efficiency.

  7. Transcriptome dynamics of human pluripotent stem cell-derived contracting cardiomyocytes using an embryoid body model with fetal bovine serum.

    Science.gov (United States)

    Jung, Kwang Bo; Son, Ye Seul; Lee, Hana; Jung, Cho-Rok; Kim, Janghwan; Son, Mi-Young

    2017-07-25

    Cardiomyocyte (CM) differentiation techniques for generating adult-like mature CMs remain imperfect, and the plausible underlying mechanisms remain unclear; however, there are a number of current protocols available. Here, to explore the mechanisms controlling cardiac differentiation, we analyzed the genome-wide transcription dynamics occurring during the differentiation of human pluripotent stem cells (hPSCs) into CMs using embryoid body (EB) formation. We optimized and updated the protocol to efficiently generate contracting CMs from hPSCs by adding fetal bovine serum (FBS) as a medium supplement, which could have a significant impact on the efficiency of cardiac differentiation. To identify genes, biological processes, and pathways involved in the cardiac differentiation of hPSCs, integrative and comparative analyses of the transcriptome profiles of differentiated CMs from hPSCs and of control CMs of the adult human heart (CM-AHH) were performed using gene ontology, functional annotation clustering, and pathway analyses. Several genes commonly regulated in the differentiated CMs and CM-AHH were enriched in pathways related to cell cycle and nucleotide metabolism. Strikingly, we found that current differentiation protocols did not promote sufficient expression of genes involved in oxidative phosphorylation to differentiate CMs from hPSCs compared to the expression levels in CM-AHH. Therefore, to obtain mature CMs similar to CM-AHH, these deficient pathways in CM differentiation, such as energy-related pathways, must be augmented prior to use for in vitro and in vivo applications. This approach opens up new avenues for facilitating the utilization of hPSC-derived CMs in biomedical research, drug evaluation, and clinical applications for patients with cardiac failure.

  8. Contract Design: The problem of information asymmetry.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation. Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete) contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection) and after conclusion of a contract (moral hazard). Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved at no-costs. The presented problems in the design of selective individual contracts

  9. Psychological contracts of hospice nurses.

    Science.gov (United States)

    Jones, Audrey Elizabeth; Sambrook, Sally

    2010-12-01

    Psychological contracts have been described as individuals' beliefs regarding the obligations, expectations, and contributions that exist between them and their employer. They can be influenced by the organization's culture and philosophy, through human resources policies, and through the employee's personality and characteristics. Owing to the recent economic crisis, hospices in the UK are currently in a transitional phase and are being expected to demonstrate efficiencies that might be more in line with a business model than a health-care environment. This may conflict with the philosophical views of hospice nurses. To support nurses through this transition, it might be helpful to understand the antecedents of hospice nurses' behaviour and how they construct their psychological contracts. Failure to offer adequate support might lead to negative outcomes such as a desire to leave the organisation, poorer quality work, or disruptive behaviour. This study used a modified grounded theory approach involving in-depth interviews to explore the context and content of the psychological contracts of hospice nurses in the UK. Four main themes emerged: the types of psychological contracts formed, how the contracts are formed, their contents, and the breaches and potential violations the nurses perceive.

  10. Contract-based Internet Service Software Development

    DEFF Research Database (Denmark)

    Giambiagi, Pablo; Owe, Olaf; Schneider, Gerardo

    The fast evolution of the Internet has popularized service-oriented architectures dynamic IT-supported inter-business collaborations. Yet, interoperability between different organizations, requires contracts to reduce risks. Thus, high-level models of contracts are making their way into service...

  11. Teaching Activities for the Construction of a Precursor Model in 5- to 6-Year-Old Children's Thinking: The Case of Thermal Expansion and Contraction of Metals

    Science.gov (United States)

    Ravanis, Konstantinos; Papandreou, Maria; Kampeza, Maria; Vellopoulou, Angeliki

    2013-01-01

    This article presents the results of empirical research on the construction of a precursor model of the phenomenon of thermal expansion and contraction of metals in preschool children's thinking, which is compatible with the model used in science education. The research included 87 children aged 5-6. It was conducted at four stages, during…

  12. New staff contract policy

    CERN Document Server

    HR Department

    2006-01-01

    Following discussion at TREF and on the recommendation of the Finance Committee, Council approved a new staff contract policy, which became effective on 1 January 2006. Its application is covered by a new Administrative Circular No. 2 (Rev. 3) 'Recruitment, appointment and possible developments regarding the contractual position of staff members'. The revised circular replaces the previous Circulars No. 9 (Rev. 3) 'Staff contracts' and No. 2 (Rev. 2) 'Guidelines and procedures concerning recruitment and probation period for staff members'. The main features of the new contract policy are as follows: The new policy provides chances for long-term employment for all staff recruits staying for four years without distinguishing between those assigned to long-term or short-term activities when joining CERN. In addition, it presents a number of simplifications for the award of ICs. There are henceforth only 2 types of contract: Limited Duration (LD) contracts for all recruitment and Indefinite Contracts (IC) for...

  13. Copyright Preemption of Contracts

    OpenAIRE

    Bohannan, Christina

    2008-01-01

    This Article argues that both courts and scholars are wrong in their categorical approaches to preemption of contracts under the Copyright Act, and proposes an intermediate approach that recognizes the importance of both contract rights and federal policy in preemption analysis. First, it argues that both courts and scholars have misapplied preemption law to breach of contract claims. Although the two sides tend to favor opposite results, they take equally categorical approaches. Categori...

  14. Choice of Contract Type and Other Policy Initiatives for Reducing Contract Prices

    Science.gov (United States)

    2013-09-01

    system franchise model). Assume that the contractor retained ownership of the design rights so that subsequent procurement lots are not open to...2 1. The Weapon System Franchise Model ..........................................................2 2. The Agency Problem and...40 2. Contracting for Time vs . Contracting for Performance ..............................41 B. Empirical Analysis of DoD Service

  15. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new......Insightful and comprehensive and covering new subjects like globalization and IT, this text, international in its approach, provides a thorough introduction to the key phases of the contracting process and the skills required by managers in its implementation. These include: policy for contracting...

  16. Smart contracts sobre Bitcoin

    OpenAIRE

    Andreu Alemany, Josep Miquel

    2016-01-01

    El present treball final de màster realitza una introducció als smart contracts. El treball introdueix el concepte de contracte intel·ligent, els seus usos i alguns exemples existents. Seguidament proporciona les nocions necessàries de les transaccions del protocol Bitcoin per poder implementar un contracte intel·ligent, usant la blockchain que ofereix el protocol. Per últim, s'explica la implementació d'un contracte intel·ligent usant bitcoin: un canal de micropagaments. El presente traba...

  17. Development of a model for evaluating mechanical effects of crustal movements on the disposal system in Japan (Contract research)

    International Nuclear Information System (INIS)

    Nagasawa, Hirokazu; Takeda, Seiji; Kimura, Hideo

    2010-08-01

    In the safety assessment of geological disposal for high level radioactive wastes, it is important to develop the modelling for evaluating mechanical effects of crustal movements on the disposal system in Japan. In this study, the model on crustal movements is represented by accumulating two components of velocity magnitude of the crust to horizontal direction, caused by transient movements associated with fault and/or volcanic activities and ordinary movements with the other continuous factors. We have quantified the ordinary movements with the statistical analysis of data included in the GEONET (GPS Earth Observation Network System) of GSI (Geographical Survey Institute). Okada Model is applied for evaluating the transient movements, which can handle three-dimensional movements of earthquake and volcanic activities theologically and comprehensively. In this report, we provide the specification of the model on crustal movement and analyze the horizontal velocity in Tohoku region using the model. The result indicates that the ordinary movements are classified with magnitude of the longitudinal velocities. The cluster of longitudinal velocities has been distributed along the plate boundary. Because the velocities of the ordinary movements are grater than one of transient movements, the spatial distribution of longitudinal velocities in Tohoku region is similar to that of the ordinary movements. (author)

  18. Supply Chain Bilateral Coordination with Option Contracts under Inflation Scenarios

    Directory of Open Access Journals (Sweden)

    Nana Wan

    2015-01-01

    Full Text Available There exist obvious changes in price and demand during the inflationary period, both of which are regarded as the key factors leading to supply chain uncertainty. In this paper, we focus our discussion on price increase and demand contraction caused by inflation, integrate the effect of inflation and option contracts within the model framework, and analyze how to use option contracts to achieve supply chain coordination under inflation scenarios. We consider a one-period two-stage supply chain consisting of one supplier and one retailer and explore the effect of inflation on the optimal ordering and production decisions under three different types of contracts: wholesale price contracts, option contracts, and portfolio contracts. Moreover, we explore the impact of option contracts on the supply chain through using wholesale price contracts model as the benchmark. We find that the retailer prefers adopting portfolio contracts, but the supplier prefers providing option contracts under inflation scenarios. Ultimately, option contracts will be implemented owing to the supplier’s market dominant position. In addition, we discuss the supply chain bilateral coordination mechanism with option contracts from the perspectives of two members and derive that option contracts can coordinate the supply chain and achieve Pareto improvement under inflation scenarios.

  19. Study on reciprocal relation of pore water pressure with genetic algorithm and neural network model (Contract research)

    International Nuclear Information System (INIS)

    Seno, Shoji; Nakajima, Makoto; Toida, Masaru; Kunimaru, Takanori; Watanabe, Kunio; Sohail Ahmed Rai

    2009-12-01

    Horonobe Underground Research Center has carried out the Horonobe Underground Research Laboratory Project which is a comprehensive research project to investigate the deep geological environment within sedimentary rock. In this project, long-term observation of the pore water pressure has been conducted with monitoring systems introduced in 9 of 11 boreholes drilled in phase I (surface-based investigation). Since August 2003 the monitoring systems have been settled successively in the boreholes, and a certain amount of the pore water pressure data has been already accumulated. Using 6 borehole data (HDB-1,3,6,7,8,9) among this, this report summarized the result of a study on reciprocal relation of pore water pressure to investigate the hydrogeological environment of this site. At first, to exclude the influences of working of nature such as tide and atmospheric pressure from the source data, an analysis with Bayesian model was progressed. As the result of the estimation of these influences calculated by BAYTAP-G (Bayesian Tidal Analysis Program Grouping Model), it was found that the influence of the atmospheric pressure was comparatively large and that of tide was comparatively small. Secondly, an analysis on the reciprocal relation of the pore water pressure was carried out to investigate the relation between the different depth points of the same borehole and the relation between different boreholes. As the result of the calculations with genetic algorithm (GA) and neural network models (BPANN, GAANN), it was found that estimation by GA models was better than other models in the case where analyzing data included radical changes. And the result also showed that in regions lower than GL.-400m of HDB-3,6,7,8, the pore water pressures change in the same manner. These results indicate the effectiveness of this analysis method. (author)

  20. Physics of muscle contraction

    Science.gov (United States)

    Caruel, M.; Truskinovsky, L.

    2018-03-01

    In this paper we report, clarify and broaden various recent efforts to complement the chemistry-centered models of force generation in (skeletal) muscles by mechanics-centered models. The physical mechanisms of interest can be grouped into two classes: passive and active. The main passive effect is the fast force recovery which does not require the detachment of myosin cross-bridges from actin filaments and can operate without a specialized supply of metabolic fuel (ATP). In mechanical terms, it can be viewed as a collective folding-unfolding phenomenon in the system of interacting bi-stable units and modeled by near equilibrium Langevin dynamics. The active force generation mechanism operates at slow time scales, requires detachment and is crucially dependent on ATP hydrolysis. The underlying mechanical processes take place far from equilibrium and are represented by stochastic models with broken time reversal symmetry implying non-potentiality, correlated noise or multiple reservoirs. The modeling approaches reviewed in this paper deal with both active and passive processes and support from the mechanical perspective the biological point of view that phenomena involved in slow (active) and fast (passive) force generation are tightly intertwined. They reveal, however, that biochemical studies in solution, macroscopic physiological measurements and structural analysis do not provide by themselves all the necessary insights into the functioning of the organized contractile system. In particular, the reviewed body of work emphasizes the important role of long-range interactions and criticality in securing the targeted mechanical response in the physiological regime of isometric contractions. The importance of the purely mechanical micro-scale modeling is accentuated at the end of the paper where we address the puzzling issue of the stability of muscle response on the so called ‘descending limb’ of the isometric tetanus.

  1. Physics of muscle contraction.

    Science.gov (United States)

    Caruel, M; Truskinovsky, L

    2018-03-01

    In this paper we report, clarify and broaden various recent efforts to complement the chemistry-centered models of force generation in (skeletal) muscles by mechanics-centered models. The physical mechanisms of interest can be grouped into two classes: passive and active. The main passive effect is the fast force recovery which does not require the detachment of myosin cross-bridges from actin filaments and can operate without a specialized supply of metabolic fuel (ATP). In mechanical terms, it can be viewed as a collective folding-unfolding phenomenon in the system of interacting bi-stable units and modeled by near equilibrium Langevin dynamics. The active force generation mechanism operates at slow time scales, requires detachment and is crucially dependent on ATP hydrolysis. The underlying mechanical processes take place far from equilibrium and are represented by stochastic models with broken time reversal symmetry implying non-potentiality, correlated noise or multiple reservoirs. The modeling approaches reviewed in this paper deal with both active and passive processes and support from the mechanical perspective the biological point of view that phenomena involved in slow (active) and fast (passive) force generation are tightly intertwined. They reveal, however, that biochemical studies in solution, macroscopic physiological measurements and structural analysis do not provide by themselves all the necessary insights into the functioning of the organized contractile system. In particular, the reviewed body of work emphasizes the important role of long-range interactions and criticality in securing the targeted mechanical response in the physiological regime of isometric contractions. The importance of the purely mechanical micro-scale modeling is accentuated at the end of the paper where we address the puzzling issue of the stability of muscle response on the so called 'descending limb' of the isometric tetanus.

  2. Contract Design: Financial Options and Risk.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. When designing healthcare options contractors are faced with a variety of financial options. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the second in a row of three that are all published in this issue and contribute to a specific issue in designing healthcare contracts. The first dealt with the organisation of contracts and information asymmetries, while part 3 concludes with the question of risk management and evaluation. The specific research question of this second article focusses on the financial options and reimbursement schemes that are available to define healthcare contracts. A healthcare contract is a relational contract, which determines the level of reimbursement, the scope of services and the quality between service providers and payers, taking account of the risks relating to population and performance. A relational contract is an agreement based upon assumption of a longer timeframe. A major obstacle to the practical implementation of healthcare contracts is the prognosis of the inflows and outflows due to the actuarial risks of the insured population. Financing conditions and reimbursement arrangements that are based on a prospectively determined fixed price, have a significant drawback: it is very difficult to take the differences in health status and the utilisation of distinct insured clientele

  3. Democratic contract law

    NARCIS (Netherlands)

    Hesselink, M.W.

    2015-01-01

    This article discusses the normative relationship between contract law and democracy. In particular, it argues that in order to be legitimate contract law needs to have a democratic basis. Private law is not different in this respect from public law. Thus, the first claim made in this article will

  4. Contract Teachers in India

    Science.gov (United States)

    Goyal, Sangeeta; Pandey, Priyanka

    2013-01-01

    In this paper, we use non-experimental data from government schools in Uttar Pradesh and Madhya Pradesh, two of the largest Indian states, to present average school outcomes by contract status of teachers. We find that contract teachers are associated with higher effort than civil service teachers with permanent tenures, before as well as after…

  5. Whither Performance Contracting?

    Science.gov (United States)

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  6. Comparing contracting performance

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian

    . Hypotheses are suggested for the role of culture, competition, contracts, capabilities and collaboration for contracting performance between and across the countries. Arguments are tested against data from on four comparable national surveys of private delivery of park and road maintenance services in local...

  7. BOT Outsourcing Contracts

    DEFF Research Database (Denmark)

    Ørberg Jensen, Peter D.; Petersen, Bent

    2012-01-01

    Build-operate-transfer (BOT) contracting has been widely usen in the engineering and construction industry, but has only recently been introduced in services industry domains. Notably, service provider firms from emerging markets have recently started offering BOT outsourcing contracts. In this p...

  8. Explaining the contract terms of energy performance contracting in China: The importance of effective financing

    International Nuclear Information System (INIS)

    Li, Yan; Qiu, Yueming; Wang, Yi David

    2014-01-01

    Energy service company (“ESCO”) uses Energy Performance Contracting (“EPC”) to provide energy-saving services to its clients. Under an EPC, both ESCO and the client invest in the energy efficiency measures, according to a negotiated share of investment. Within the length of the contract, the ESCO and its client divide up the saved energy bill according to a negotiated share. Once the contract expires, the client claims all of the saved energy bills if the energy efficiency measures still last. Different EPC projects have different contract terms, including total investment, share of investment and length of contract. These contract terms directly determine the resulted energy savings. Thus it is essential and important to look at how these contract terms are formed and what are the major influencing factors. This paper first builds a theoretical bargain model between ESCO and its client to find out the structural relationship among these contract terms. Then, using the information of about 140 EPC contracts in China in 2010 and 2011, the paper empirically estimates the impacts of various factors on the contract terms and the resulted energy savings. We find that cost of capitals for ESCOs and the clients, especially for ESCOs, is a major factor influencing contract terms and the resulted energy savings. Thus providing effective financing is critical for the development of EPC in China. - Highlights: • We build a theoretical bargain model between an ESCO and its client. • We empirically quantify the impacts of various factors on EPC contract terms. • Cost of capital is a key factor determining EPC contract terms. • Providing effective financing, especially for ESCOs is important

  9. Drilling contracts and incentives

    International Nuclear Information System (INIS)

    Osmundsen, Petter; Sorenes, Terje; Toft, Anders

    2008-01-01

    Shortages of rigs and personnel have encouraged discussion of designing incentive contracts in the drilling sector. However, for the drilling contracts, there are not a large variety of contract types in use. This article describes and analyses incentives for drilling contractors. These are directly represented by the compensation formats utilised in the present and in the consecutive drilling contracts. Indirectly, incentives are also provided by the evaluation criteria that oil companies use for awarding drilling assignments. Changes in contract format pose a number of relevant questions relating to resource management, and the article takes an in-depth look at some of these. Do evaluation criteria for awarding drilling assignments encourage the development of new technology and solutions? How will a stronger focus on drilling efficiency influence reservoir utilisation?

  10. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  11. THE PSYCHOLOGICAL CONTRACT

    Directory of Open Access Journals (Sweden)

    Blanca Giorgiana GRAMA

    2015-04-01

    Full Text Available The psychological contract became known as a research paradigm within corporate research, providing a broad framework which explains the employee-company relations. Despite all this, there are still many debates on the concept and a series of criticism were expressed that led to the necessity of some more rigorous theoretical and empirical analysis. The psychological contract refers to the unwritten, implicit expectations that employees have from the company and vice versa; it is that which defines the things the employee expects from the employer. Consequently, each of the parties involved in the contract may have different perceptions on these commitments and obligations. Thus the psychological contract may be regarded as an exchange relation between the employer and the employee. Breaking the psychological contract affects the performance, the morale, and the motivation of the staff in a negative manner. The information presented in this paper is intended to contribute to the theoretical and methodological development of the concept.

  12. Contract Design: Risk Management and Evaluation.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial) dependence of the agent's returns on the provider's gain level. Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting. Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods of risk adjustment have widely differing model and forecast

  13. Contract Design: Risk Management and Evaluation

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial dependence of the agent’s returns on the provider’s gain level. Integrated care systems as well as accountable care organisations (ACOs in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced.  Methods: Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting.  Results: Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods

  14. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  15. Impacts of government subsidies on pricing and performance level choice in Energy Performance Contracting: A two-step optimal decision model

    International Nuclear Information System (INIS)

    Lu, Zhijian; Shao, Shuai

    2016-01-01

    Highlights: • An ESCO optimal decision model considering governmental subsidies is proposed. • Optimal price and performance level are deduced via a two-stage model. • Demand, profit, and performance level increase with increasing subsidies. • ESCO’s market strategy should firstly focus on high energy consumption industries. • Governmental subsidies standard in different industries should be differentiated. - Abstract: Government subsidies generally play a crucial role in pricing and the choice of performance levels in Energy Performance Contracting (EPC). However, the existing studies pay little attention to how the Energy Service Company (ESCO) prices and chooses performance levels for EPC with government subsidies. To fill such a gap, we propose a joint optimal decision model of pricing and performance level in EPC considering government subsidies. The optimization of the model is achieved via a two-stage process. At the first stage, given a performance level, ESCOs choose the best price; and at the second stage, ESCOs choose the optimal performance level for the optimal price. Furthermore, we carry out a numerical analysis to illuminate such an optimal decision mechanism. The results show that both price sensitivity and performance level sensitivity have significant effects on the choice of performance levels with government subsidies. Government subsidies can induce higher performance levels of EPC, the demand for EPC, and the profit of ESCO. We suggest that ESCO’s market strategy should firstly focus on high energy consumption industries with government subsidies and that government subsidies standard adopted in different industries should be differentiated according to the market characteristics and energy efficiency levels of various industries.

  16. What factors influence the use of contracts in the context of NHS dental practice? A systematic review of theory and logic model.

    Science.gov (United States)

    Harris, Rebecca; Mosedale, Sarah; Garner, Jayne; Perkins, Elizabeth

    2014-05-01

    UK NHS contracts mediate the relationship between dental and medical practitioners as independent contractors, and the state which reimburses them for their services to patients. There have been successive revisions of dental and medical contracts since the 1990s alongside a change in the levels of professional dominance and accountability. Unintended consequences of the 2006 dental contract have led to plans for further reform. We set out to identify the factors which facilitate and hinder the use of contracts in this area. Previous reviews of theory have been narrative, and based on macro-theory arising from various disciplines such as economics, sociology and political science. This paper presents a systematic review and aggregative synthesis of the theories of contracting for publicly funded health care. A logic map conveys internal pathways linking competition for contracts to opportunism. We identify that whilst practitioners' responses to contract rules is a result of micro-level bargaining clarifying patients' and providers' interests, responses are also influenced by relationships with commissioners and wider personal, professional and political networks. Copyright © 2014 The Authors. Published by Elsevier Ltd.. All rights reserved.

  17. What factors influence the use of contracts in the context of NHS dental practice? A systematic review of theory and logic model

    Science.gov (United States)

    Harris, Rebecca; Mosedale, Sarah; Garner, Jayne; Perkins, Elizabeth

    2014-01-01

    UK NHS contracts mediate the relationship between dental and medical practitioners as independent contractors, and the state which reimburses them for their services to patients. There have been successive revisions of dental and medical contracts since the 1990s alongside a change in the levels of professional dominance and accountability. Unintended consequences of the 2006 dental contract have led to plans for further reform. We set out to identify the factors which facilitate and hinder the use of contracts in this area. Previous reviews of theory have been narrative, and based on macro-theory arising from various disciplines such as economics, sociology and political science. This paper presents a systematic review and aggregative synthesis of the theories of contracting for publicly funded health care. A logic map conveys internal pathways linking competition for contracts to opportunism. We identify that whilst practitioners' responses to contract rules is a result of micro-level bargaining clarifying patients' and providers' interests, responses are also influenced by relationships with commissioners and wider personal, professional and political networks. PMID:24608120

  18. Optimal Contracting under Adverse Selection

    DEFF Research Database (Denmark)

    Lenells, Jonatan; Stea, Diego; Foss, Nicolai Juul

    2015-01-01

    We study a model of adverse selection, hard and soft information, and mentalizing ability--the human capacity to represent others' intentions, knowledge, and beliefs. By allowing for a continuous range of different information types, as well as for different means of acquiring information, we dev...... of that information. This strategy affects the properties of the optimal contract, which grows closer to the first best. This research provides insights into the implications of mentalizing for agency theory....

  19. ENFORCEMENT OF MORTGAGE CONTRACT

    Directory of Open Access Journals (Sweden)

    Alisa A. BELU

    2016-07-01

    Full Text Available A chattel mortgage contract is the expression of a real guarantee that gives the creditor precedence over other creditors, in addition to the general pledge upon the belongings of the debtor. It refers to the sale of mortgaged movable assets, exclusively or prioritized in favor of the mortgaging creditor, in case the debtor does not comply with his / her commitments, under the signed mortgage contract. Beginning from this purpose, shared by both sides (as the chattel mortgage contract is synallagmatic, in case the debtor is unable to fulfill his / her commitments, the sides reach a situation of enforcement of the signed chattel mortgage contract. Given the legal status of the chattel mortgage contract [Art. 2387-2477 Noul Cod Civil , Universul Juridic, Bucureşti, 2016, ISBN 978-606-673-792-0], the principle of binding force of the contract and the principle according to which signed legal conventions will entail legal effects, the Romanian law maker developed the proper legal framework for the enforcement of the chattel mortgage contract. [art. 622 si urm. Noul Cod de Procedură Civilă, ed. Hamangiu, Bucureşti, 2016, ISBN 978-606-27-0459-9].

  20. JURIDICAL WILL IN CONTRACTS

    Directory of Open Access Journals (Sweden)

    Emilian CIONGARU

    2015-07-01

    Full Text Available In the business law, almost all judicial relationships of private law are obligational juridical relationships which are made up of legal acts and facts. The most important legal act is the contract since it is the basis of the social life in any community meaning that it represents the most important economic and juridical instrument for the participants to a contract. The persons are free and equal in society and, consequently, no power is valid and fundamental unless it relies on their consent, namely on a contract. So, the existence of a civil contract relies on the principles of consensualism, a perception based on moral rules to observe one’s promises, to have good faith and to observe the interests of your fellow creature. The exterior manifestation, the expression or declaration of the juridical will constitutes the consent of such person in making the structure of contract. The declared will must correspond to the person’s real will and the adoption and declaration of the juridical will must take place consciously. Any contract that does not derive from juridical will is null and the civilizing character is inexistent. The principles giving sense to consensualism is the one of agreement between parties so as to produce legal effects by itself and it is enough for the conclusion of a contract, regardless of the form in which it is exteriorized, a principle expressed by the Latin adagio pacta sunt servanda.

  1. Gallic acid attenuates pulmonary fibrosis in a mouse model of transverse aortic contraction-induced heart failure.

    Science.gov (United States)

    Jin, Li; Piao, Zhe Hao; Sun, Simei; Liu, Bin; Ryu, Yuhee; Choi, Sin Young; Kim, Gwi Ran; Kim, Hyung-Seok; Kee, Hae Jin; Jeong, Myung Ho

    2017-12-01

    Gallic acid, a trihydroxybenzoic acid found in tea and other plants, attenuates cardiac hypertrophy, fibrosis, and hypertension in animal models. However, the role of gallic acid in heart failure remains unknown. In this study, we show that gallic acid administration prevents heart failure-induced pulmonary fibrosis. Heart failure induced in mice, 8weeks after transverse aortic constriction (TAC) surgery, was confirmed by echocardiography. Treatment for 2weeks with gallic acid but not furosemide prevented cardiac dysfunction in mice. Gallic acid significantly inhibited TAC-induced pathological changes in the lungs, such as increased lung mass, pulmonary fibrosis, and damaged alveolar morphology. It also decreased the expression of fibrosis-related genes, including collagen types I and III, fibronectin, connective tissue growth factor (CTGF), and phosphorylated Smad3. Further, it inhibited the expression of epithelial-mesenchymal transition (EMT)-related genes, such as N-cadherin, vimentin, E-cadherin, SNAI1, and TWIST1. We suggest that gallic acid has therapeutic potential for the treatment of heart failure-induced pulmonary fibrosis. Copyright © 2017 Elsevier Inc. All rights reserved.

  2. The determinants of loan contracts to business firms

    OpenAIRE

    Pham, Thi Thu Trà; Lensink, Robert

    2006-01-01

    This paper deals with loan contracting from a private bank in Vietnam. We focus on the main loan contract features that the bank uses in lending to business firms, namely loan maturity, collateral and loan interest rate. Based upon the simultaneous equation model of Dennis et al. (2000) and the bank’s loan contracting policies, we examine the possible interdependency of the three different loan contract terms. Also, we try to determine which firm characteristics and exogenous factors are rele...

  3. Determinants for Labour Contract Length: A French Microeconometric Study

    OpenAIRE

    Ben Halima, Mohamed; Ben Halima, Bassem

    2008-01-01

    International audience; Two types of analyses are conducted to explain the determinants of labour contracts length. The first analysis emphasizes on the contracting costs and the level of uncertainty. The second analysis focuses on the incentive and selection effect of the contract length. This paper test the determinants for contract duration by means of econometric duration models. The estimates are carried out from French data (TDE). An econometric treatment of the endogeneity of the labou...

  4. Bottlenecks and contracts

    International Nuclear Information System (INIS)

    2001-01-01

    The report surveys the central points in the literature about contracts on geographical price differences and transmission rights in the power market. It is commonly believed that such contracts may reduce market power and contribute to better network investments. The theoretical debate is in part unfinished and largely based on very stylised assumptions. There is some indication that such contracts may not be very useful in practice. But they may be useful in some cases, perhaps in particular when power is transported outside limited surplus areas and for certain investment decisions where there is no systems operator with a natural responsibility

  5. Contract management survey 2002.

    Science.gov (United States)

    Hoppszallern, Suzanna

    2002-10-01

    Spending on clinical contracts continues to outpace spending on business services, but may be leveling off. The 12th annual Contract Management Survey shows that the performance of clinical vendors is now comparable to business service vendors in meeting savings targets. Both business and clinical vendors are receiving higher marks from hospital leaders, but execs quickly respond to low marks by bringing the service back in-house of changing vendors. This report examines trends in outsourcing, satisfaction levels, the decision-making process, contract features and performance, and spending.

  6. 2001 contract management survey.

    Science.gov (United States)

    2001-10-01

    For the second year running, hospitals are spending more on clinical outsourcing than on business services. The Eleventh Annual Contract Services Survey shows that, in clinical areas, executives use outsourcing to acquire specialized expertise with cost savings secondary. Reducing costs and FTEs are the primary reasons for outsourcing business operations. Business service contracts are more likely to meet expectations for cost savings. Overall, satisfaction levels are up, but in some areas there's still a lot of room for improvement. This report examines current trends in outsourcing, strategies for the future, satisfaction levels, the decisionmaking process, contract features, and costs.

  7. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  8. A Guide to Performance Contracting. A Presentation and Discussion of the Multiple Considerations Regarding Contracted Services in Local Education Agencies.

    Science.gov (United States)

    Adams, John W.; Kitchak, Karen H.

    This report provides a framework for evaluating the use of performance contracts. It serves as a working guide for those who are considering or are committed to performance contracts with public or private organizations. The topics cover (1) the theoretical basis and rationale of performance contracting, (2) the procurement model and the request…

  9. Species-specific ecological niche modelling predicts different range contractions for Lutzomyia intermedia and a related vector of Leishmania braziliensis following climate change in South America.

    Science.gov (United States)

    McIntyre, Shannon; Rangel, Elizabeth F; Ready, Paul D; Carvalho, Bruno M

    2017-03-24

    Before 1996 the phlebotomine sand fly Lutzomyia neivai was usually treated as a synonym of the morphologically similar Lutzomyia intermedia, which has long been considered a vector of Leishmania braziliensis, the causative agent of much cutaneous leishmaniasis in South America. This report investigates the likely range changes of both sand fly species in response to a stabilisation climate change scenario (RCP4.5) and a high greenhouse gas emissions one (RCP8.5). Ecological niche modelling was used to identify areas of South America with climates currently suitable for each species, and then the future distributions of these climates were predicted based on climate change scenarios. Compared with the previous ecological niche model of L. intermedia (sensu lato) produced using the GARP algorithm in 2003, the current investigation modelled the two species separately, making use of verified presence records and additional records after 2001. Also, the new ensemble approach employed ecological niche modelling algorithms (including Maximum Entropy, Random Forests and Support Vector Machines) that have been widely adopted since 2003 and perform better than GARP, as well as using a more recent climate change model (HadGEM2) considered to have better performance at higher resolution than the earlier one (HadCM2). Lutzomyia intermedia was shown to be the more tropical of the two species, with its climatic niche defined by higher annual mean temperatures and lower temperature seasonality, in contrast to the more subtropical L. neivai. These different latitudinal ranges explain the two species' predicted responses to climate change by 2050, with L. intermedia mostly contracting its range (except perhaps in northeast Brazil) and L. neivai mostly shifting its range southwards in Brazil and Argentina. This contradicts the findings of the 2003 report, which predicted more range expansion. The different findings can be explained by the improved data sets and modelling methods. Our

  10. The energy of naturally curved elastic rods with an application to the stretching and contraction of a free helical spring as a model for DNA

    Energy Technology Data Exchange (ETDEWEB)

    Manning, Gerald S., E-mail: jerrymanning@rcn.com [Department of Chemistry and Chemical Biology, Rutgers University, 610 Taylor Road, Piscataway, New Jersey 08854-8087 (United States)

    2015-09-14

    We give a contemporary and direct derivation of a classical, but insufficiently familiar, result in the theory of linear elasticity—a representation for the energy of a stressed elastic rod with central axis that intrinsically takes the shape of a general space curve. We show that the geometric torsion of the space curve, while playing a crucial role in the bending energy, is physically unrelated to the elastic twist. We prove that the twist energy vanishes in the lowest-energy states of a rod subject to constraints that do not restrict the twist. The stretching and contraction energies of a free helical spring are computed. There are local high-energy minima. We show the possibility of using the spring to model the chirality of DNA. We then compare our results with an available atomic level energy simulation that was performed on DNA unconstrained in the same sense as the free spring. We find some possible reflections of springlike behavior in the mechanics of DNA, but, unsurprisingly, the base pairs lend a material substance to the core of DNA that a spring does not capture.

  11. The energy of naturally curved elastic rods with an application to the stretching and contraction of a free helical spring as a model for DNA

    Science.gov (United States)

    Manning, Gerald S.

    2015-09-01

    We give a contemporary and direct derivation of a classical, but insufficiently familiar, result in the theory of linear elasticity—a representation for the energy of a stressed elastic rod with central axis that intrinsically takes the shape of a general space curve. We show that the geometric torsion of the space curve, while playing a crucial role in the bending energy, is physically unrelated to the elastic twist. We prove that the twist energy vanishes in the lowest-energy states of a rod subject to constraints that do not restrict the twist. The stretching and contraction energies of a free helical spring are computed. There are local high-energy minima. We show the possibility of using the spring to model the chirality of DNA. We then compare our results with an available atomic level energy simulation that was performed on DNA unconstrained in the same sense as the free spring. We find some possible reflections of springlike behavior in the mechanics of DNA, but, unsurprisingly, the base pairs lend a material substance to the core of DNA that a spring does not capture.

  12. Establishing contract periods

    International Nuclear Information System (INIS)

    Huffman, F.C.

    1978-01-01

    The lead time for executing the Adjustable Fixed-Commitment (AFC) contract and exceptions which may be considered are discussed. The initial delivery period is also discussed. Delays, deferrals, and schedule adjustment charges are finally considered

  13. Industrial Services Contracts

    CERN Document Server

    2006-01-01

    This document gives an overview of Industrial Services contracts at CERN, including the probable expenditure in 2006 and the estimated expenditure for 2007. The Finance Committee is invited: - to take note of the revised amount in 2006 for Industrial Services contracts referred to in this document of 138.02 MCHF at 2006 prices compared to the previously anticipated amount of 122.67 MCHF at 2005 prices; - to take note that the estimated amount in 2007 for the contracts referred to in this document will be 112.54 MCHF at 2006 prices; - for the reasons set out in this document, the Finance Committee is also invited to approve the requests for the contracts presented and highlighted in the Annexes.

  14. Temporary labour contracts

    CERN Document Server

    2001-01-01

    At its September 2000 meeting, the Finance Committee approved a second one-year extension of the four existing temporary labour contracts (L020/PE, L021/PE, L022/PE, L023/PE) until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices. The Finance Committee is invited: - to take note that the estimated annual expenditure on temporary labour in 2001 will amount to approximately 4 500 000 Swiss francs against the previously estimated 6 000 000 Swiss francs; - to approve the extension of the four existing contracts by six months to 30 June 2002 for an overall amount not exceeding 1 500 000 Swiss francs; - to take note that new contracts for the Swiss part of the CERN site will be submitted for adjudication in December 2001 and that new contracts for the French part of the CERN site will be submitted for adjudication in the course of 2002.

  15. Temporary labour contracts

    CERN Document Server

    1999-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L021/PE, L022/PE, L023/PE and L024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) will reach the end of their initial three-year contractual period at the end of December 1999. Following the satisfactory execution of these contracts during this period, CERN requests approval to extend them from January 2000 for the first of the two years foreseen in the original adjudication. The Finance Committee is invited: - to take note that the three-year expenditure for Temporary Labour contracts from 1997 to 1999 will not exceed 19 100 000 Swiss francs, compared to the 18 900 000 Swiss francs estimated at the time of the adjudication in March 1996; - to approve an extension of the present Temporary Labour contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs.

  16. CM5, a pre-Swarm comprehensive geomagnetic field model derived from over 12 yr of CHAMP, Ørsted, SAC-C and observatory data

    DEFF Research Database (Denmark)

    Sabaka, Terence J.; Olsen, Nils; Tyler, Robert H.

    2015-01-01

    A comprehensive magnetic field model named CM5 has been derived from CHAMP, Orsted and SAC-C satellite and observatory hourly-means data from 2000 August to 2013 January using the Swarm Level-2 Comprehensive Inversion (CI) algorithm. Swarm is a recently launched constellation of three satellites ...

  17. Corrupt Relational Contracting

    OpenAIRE

    Johann Graf Lambsdorff; Sitki Utku Teksoz

    2002-01-01

    Because corruption must be hidden from the public and is not enforced by courts it entails transaction costs, which are larger than those from legal exchange. This suggests that corrupt contracts are primarily relational contracts where legal exchange serves as a basis for sealing and enforcing corrupt agreements. Legal exchange not only provides for corrupt opportunities, but for the necessary enforcement mechanisms. Examples of such legal exchange are long-term business exchange, belonging ...

  18. Contracting as a Science

    Science.gov (United States)

    2012-04-30

    disconfirmation of expectations theory to examine customer satisfaction in the procuring contracting officer (PCO)–program manager (PM) relationship in...marketing terms, finding that disconfirmed expectations lead to consumer satisfaction or dissatisfaction. The former approach presents the idea that if an...individual exerts effort, the expectation is that successful performance will occur leading to a desired result. In contracting, the theory might be

  19. Expansionary fiscal contractions

    DEFF Research Database (Denmark)

    Bergman, Ulf Michael; Hutchison, Michael

    2010-01-01

    The Expansionary Fiscal Contraction (EFC) hypothesis predicts that a major fiscal consolidation leads to an economic expansion under certain circumstances. We test this hypothesis, and the implied non-linear responses of the economy to large and small changes in fiscal policy, using data from...... that the exogenous fiscal contraction in Denmark was a credible regime shift and, together with other reforms undertaken at the time, increased both private consumption and aggregate output....

  20. Informal contracting between and within firms

    Directory of Open Access Journals (Sweden)

    Ricard Gil

    Full Text Available Abstract While informal contracts are widely used in modern economies, limited systematic empirical evidence is available to researchers and policy makers. This paper aims to fill the gap by discussing a selected sample of empirical works through the lens of a theoretical framework that clarifies the role of informal contracts. We also highlight unexplored research opportunities offered by more recent theoretical models that investigate how informal contracts are built over time, how they are subject to path dependency, and how relational rents are created, and are awaiting empirical analysis.

  1. A Module Language for Typing by Contracts

    Science.gov (United States)

    Glouche, Yann; Talpin, Jean-Pierre; LeGuernic, Paul; Gautier, Thierry

    2009-01-01

    Assume-guarantee reasoning is a popular and expressive paradigm for modular and compositional specification of programs. It is becoming a fundamental concept in some computer-aided design tools for embedded system design. In this paper, we elaborate foundations for contract-based embedded system design by proposing a general-purpose module language based on a Boolean algebra allowing to define contracts. In this framework, contracts are used to negotiate the correctness of assumptions made on the definition of a component at the point where it is used and provides guarantees to its environment. We illustrate this presentation with the specification of a simplified 4-stroke engine model.

  2. An unsatisfactory contract policy

    CERN Multimedia

    Association du personnel

    2012-01-01

    For the last 15 years contract policy has been one of the top priorities of CERN staff, as expressed in successive surveys initiated by the Staff Association. In one’s professional life, having some forward vision of one’s career prospects is the key to loyalty and motivation. On the contrary, instability about the future is always at the root of anxiety, conflicts, or even health problems. A good employer must therefore balance the needs of the Company and those of its employees. CERN’s current contract policy, as described in the Administrative Circular No 2, states that staff members should first obtain a limited duration (LD) contract of up to five years. Then, if they want to stay in the Organization, staff members must apply, usually once a year, and before the end of their LD contract, for an indefinite contract (IC) post. All candidates for an IC post are considered by the Review Board for the award of indefinite contracts (Review Board) which will choose the most suita...

  3. ADIABATIC HEATING OF CONTRACTING TURBULENT FLUIDS

    International Nuclear Information System (INIS)

    Robertson, Brant; Goldreich, Peter

    2012-01-01

    Turbulence influences the behavior of many astrophysical systems, frequently by providing non-thermal pressure support through random bulk motions. Although turbulence is commonly studied in systems with constant volume and mean density, turbulent astrophysical gases often expand or contract under the influence of pressure or gravity. Here, we examine the behavior of turbulence in contracting volumes using idealized models of compressed gases. Employing numerical simulations and an analytical model, we identify a simple mechanism by which the turbulent motions of contracting gases 'adiabatically heat', experiencing an increase in their random bulk velocities until the largest eddies in the gas circulate over a Hubble time of the contraction. Adiabatic heating provides a mechanism for sustaining turbulence in gases where no large-scale driving exists. We describe this mechanism in detail and discuss some potential applications to turbulence in astrophysical settings.

  4. Contribution of ship emissions to the concentration of PM2.5: A comprehensive study using AIS data and WRF/Chem model in Bohai Rim Region, China.

    Science.gov (United States)

    Chen, Dongsheng; Zhao, Na; Lang, Jianlei; Zhou, Ying; Wang, Xiaotong; Li, Yue; Zhao, Yuehua; Guo, Xiurui

    2018-01-01

    Compared with on-road vehicles, emission from ships is one of the least-regulated anthropogenic emission sources and non-negligible source of primary aerosols and gas-phase precursors of PM 2.5 . The Bohai Rim Region in China hosts dozens of large ports, two of which ranked among the top ten ports in the world. To determine the impact of ship emissions on the PM 2.5 concentrations over this region, two parts of works have been conducted in this study. First, a detailed ship emission inventory with high spatiotemporal resolution was developed based on Automatic Identification System (AIS) data. Then the WRF/Chem model was applied to modeling the impact of ship emissions by comparing two scenarios: with and without ship emissions. The results indicate that the total estimated ship emissions of SO 2 , NO X , PM 10 , PM 2.5 , CO, HC, and CO 2 from Bohai Rim Region in 2014 are 1.9×10 5 , 2.9×10 5 , 2.6×10 4 , 2.4×10 4 , 2.5×10 4 , 1.2×10 4 , and 1.3×10 7 tonnes, respectively. The modeling results indicate that the annual PM 2.5 concentrations increased by 5.9% on land areas of Bohai Rim Region (the continent within 115.2°E-124.3°E and 36.1°N-41.6°N) due to ship emissions. The contributions show distinctive seasonal variations of contributions, presenting highest in summer (12.5%) followed by spring (6.9%) and autumn (3.3%), and lowest in winter (0.9%). The contribution reaches up to 10.7% along the shoreline and down to 1.0% 200km inland. After examining the statistics of the modeling results during heavy and non-heavy haze days in July, it was found that 6 out of 9 cities around the Bohai Rim Region were observed with higher contributions from ship emissions during heavy haze days compared with non-heavy haze days. These results indicate that the impacts of ship emissions on the ambient PM 2.5 are non-negligible, especially for heavy haze days for most coastal cities in the Bohai Rim Region. Copyright © 2017 Elsevier B.V. All rights reserved.

  5. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.

    International Nuclear Information System (INIS)

    Schoene, Thomas

    2014-01-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  6. Contract Design: The problem of information asymmetry

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries.  Methods: A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation.  Results: Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection and after conclusion of a contract (moral hazard.  Discussion and Conclusions: Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved

  7. Survey of the Effects of Exposure to 900 MHz Radiofrequency Radiation Emitted by a GSM Mobile Phone on the Pattern of Muscle Contractions in an Animal Model

    Directory of Open Access Journals (Sweden)

    Mortazavi S. M. J.

    2015-09-01

    Full Text Available Background: The rapid development of wireless telecommunication technologies over the past decades, has led to significant changes in the exposure of the general public to electromagnetic fields. Nowadays, people are continuously exposed to different sources of electromagnetic fields such as mobile phones, mobile base stations, cordless phones, Wi-Fi routers, and power lines. Therefore, the last decade witnessed a rapidly growing concern about the possible health effects of exposure to electromagnetic fields emitted by these sources. Materials and Methods: In this study that was aimed at investigating the effects of exposure to radiofrequency (RF radiation emitted by a GSM mobile phone on the pattern of contraction in frog’s isolated gastrocnemius muscle after stimulation with single square pulses of 1V (1 Hz, pulse height of contractions, the time interval between two subsequent contractions and the latency period were measured. Results: Our findings showed that the pulse height of contractions muscle could be affected by the exposure to electromagnetic fields. Especially, the latency period was effectively altered in RF-exposed samples. However, none of the experiments could show an alteration in the time interval between two subsequent contractions after exposure to electromagnetic fields. Conclusion: These findings support early reports which indicated a wide variety of non-thermal effects of electromagnetic radiation on amphibians including the effects on the pattern of muscle extractions

  8. Survey of the Effects of Exposure to 900 MHz Radiofrequency Radiation Emitted by a GSM Mobile Phone on the Pattern of Muscle Contractions in an Animal Model.

    Science.gov (United States)

    Mortazavi, S M J; Rahimi, S; Talebi, A; Soleimani, A; Rafati, A

    2015-09-01

    The rapid development of wireless telecommunication technologies over the past decades, has led to significant changes in the exposure of the general public to electromagnetic fields. Nowadays, people are continuously exposed to different sources of electromagnetic fields such as mobile phones, mobile base stations, cordless phones, Wi-Fi routers, and power lines. Therefore, the last decade witnessed a rapidly growing concern about the possible health effects of exposure to electromagnetic fields emitted by these sources. In this study that was aimed at investigating the effects of exposure to radiofrequency (RF) radiation emitted by a GSM mobile phone on the pattern of contraction in frog's isolated gastrocnemius muscle after stimulation with single square pulses of 1V (1 Hz), pulse height of contractions, the time interval between two subsequent contractions and the latency period were measured. Our findings showed that the pulse height of contractions muscle could be affected by the exposure to electromagnetic fields. Especially, the latency period was effectively altered in RF-exposed samples. However, none of the experiments could show an alteration in the time interval between two subsequent contractions after exposure to electromagnetic fields. These findings support early reports which indicated a wide variety of non-thermal effects of electromagnetic radiation on amphibians including the effects on the pattern of muscle extractions.

  9. RESIDUAL VALUE RISK IN AUTOMOTIVE OPERATING LEASE CONTRACTS

    Directory of Open Access Journals (Sweden)

    Ivan Tot

    2017-01-01

    Full Text Available The subject of the research in this paper are automotive operating lease contracts in the Croatian business practice. The provisions of the general terms and conditions for operating lease contracts of the Croatian leasing companies are being analysed, particulary those relating to the rights and obligations of the parties to the contract after the operating lease contract was terminated and the motor vehicle returned to the lessor. The existence of three contractual models of the automotive operating lease contract in the Croatian business practice is established, which vary with regard to the assignment and the distribution of the residual value risk. Those contractual models are being compared with the two most common contractual models of automotive lease contracts in the Austrian and German business practice: the lease contract with the excess mileage adjustment and the lease contract with the terminal rent adjustment. On the basis of the results of this comparison, applicability of the legal solutions, developed in the Austrian and German jurisprudence and legal literature regarding the lease contract with the excess mileage adjustment and the lease contract with the terminal rent adjustment, to the automotive operating lease contract within the framework of Croatian law, is being examinded.

  10. INDEFINITE CONTRACT REVIEW 2000

    CERN Multimedia

    Division des ressources humaines

    2000-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen:1.\tCandidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2.\tThe criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following:staff members who are in their fourth year of service on a fixed-term contract;in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consid...

  11. INDEFINITE CONTRACT REVIEW 2001

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen: 1. Candidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2. The criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following: staff members who are in their fourth year of service on a fixed-term contract; in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consideration fo...

  12. Temporary labour contracts

    CERN Document Server

    2000-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L 021/PE, L 022/PE, L 023/PE and L 024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) reached the end of their initial three-year contractual period at the end of December 1999. At CERN?s request, in September 1999 the Finance Committee approved an extension of these contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs (CERN/FC/4196). In December 1999, one of the five contractors, FIRCROFT, withdrew from its contract for 2000. Following the satisfactory execution of the four remaining contracts during 2000, CERN requests approval to extend them from January 2001 for the second of the two optional years provided for in the original adjudication. The Finance Committee is invited to approve the extension of the existing contracts until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices.

  13. Networks and informal contract law

    NARCIS (Netherlands)

    Tjong Tjin Tai, Eric; Brownsword, Roger; van Gestel, Rob A.J.; Micklitz, Hans-W.

    2017-01-01

    It is often argued that formal contract law cannot treat networks correctly. An analysis of networks in an informal contract law system shows that informal contract law is no panacea. Remaining problems require a different approach to legal regulation and contract practice.

  14. CM5, a Pre-Swarm Comprehensive Geomagnetic Field Model Derived from Over 12 Yr of CHAMP, Orsted, SAC-C and Observatory Data

    Science.gov (United States)

    Sabaka, Terence J.; Olsen, Nils; Tyler, Robert H.; Kuvshinov, Alexey

    2014-01-01

    A comprehensive magnetic field model named CM5 has been derived from CHAMP, Ørsted and SAC-C satellite and observatory hourly-means data from 2000 August to 2013 January using the Swarm Level-2 Comprehensive Inversion (CI) algorithm. Swarm is a recently launched constellation of three satellites to map the Earth's magnetic field. The CI technique includes several interesting features such as the bias mitigation scheme known as Selective Infinite Variance Weighting (SIVW), a new treatment for attitude error in satellite vector measurements, and the inclusion of 3-D conductivity for ionospheric induction. SIVW has allowed for a much improved lithospheric field recovery over CM4 by exploiting CHAMP along-track difference data yielding resolution levels up to spherical harmonic degree 107, and has allowed for the successful extraction of the oceanic M2 tidal magnetic field from quiet, nightside data. The 3-D induction now captures anomalous Solar-quiet features in coastal observatory daily records. CM5 provides a satisfactory, continuous description of the major magnetic fields in the near-Earth region over this time span, and its lithospheric, ionospheric and oceanic M2 tidal constituents may be used as validation tools for future Swarm Level-2 products coming from the CI algorithm and other dedicated product algorithms.

  15. Capitation, contracts, and control

    International Nuclear Information System (INIS)

    McIsaac, L.H.

    1987-01-01

    The radiology business manager in today's environment must become proficient in contract evaluations and negotiations. Health care is focusing on preventive medicine. Third-party payers are offering plans and programs to provide ''well-patient'' care. For prepaid (HMO-IPA-PTO) plans to succeed, demands for reduced fees and other entrepreneurial contractual arrangements are developed. This presentation will focus on specific items contained in most contracts. The issues of withhold, billing procedures, prompt-payment rewards, medical liability, capitation determinations, and modified capitation plans will be discussed. It is the intent of this presentation to share with the audience methods of evaluating contracts, the importance of negotiating specific terms, and an approach to determination of capitation amounts

  16. PROCUREMENT AND CONTRACT MANAGEMENT

    CERN Multimedia

    Training & Development Group; Linda Orr-Easo; Tel. 72460; Nathalie Dumeaux; Tel. 78144

    2001-01-01

    We are pleased to announce the launch of a new training on: Procurement and Contract Management (This seminar will be run by CERN experts in French or in English) Level 1 The aim is to raise awareness of the key issues involved. Date : 8 June 2001 This level is open to everyone. Participants should register via our Web page as soon as possible. Level 2 To develop the skills needed to effectively manage contracts, from the Technical, Commercial and Legal aspects. Dates : Three days, Autumn 2001 This Level is open to those who are/will be more directly responsible for procurement and contract management. Participants should have followed Level 1. For a description of the seminar, please consult:   Level 1: http://training.web.cern.ch/Training/MANCO/P9798/9-cm_e.htm Level 2: http://training.web.cern.ch/Training/MANCO/P9798/9-cm2_e.htm

  17. Amending Contracts for Choreographies

    Directory of Open Access Journals (Sweden)

    Laura Bocchi

    2011-07-01

    Full Text Available Distributed interactions can be suitably designed in terms of choreographies. Such abstractions can be thought of as global descriptions of the coordination of several distributed parties. Global assertions define contracts for choreographies by annotating multiparty session types with logical formulae to validate the content of the exchanged messages. The introduction of such constraints is a critical design issue as it may be hard to specify contracts that allow each party to be able to progress without violating the contract. In this paper, we propose three methods that automatically correct inconsistent global assertions. The methods are compared by discussing their applicability and the relationships between the amended global assertions and the original (inconsistent ones.

  18. Panel discussion : contract design

    Energy Technology Data Exchange (ETDEWEB)

    Vallas, A. [Sempra Energy Trading, Toronto, ON (Canada); Vegh, G. [MacLeod Dixon, Toronto, ON (Canada); McGee, M. [Energy Profiles Ltd., Etobicoke, ON (Canada); Zaremba, T. [Direct Energy Marketing, Calgary, AB (Canada); Seshan, A. [Larson and Toubro Information Technology, Toronto, ON (Canada); Harricks, P. [Gowlings, Toronto, ON (Canada); Bertoldi, L. [Borden Ladner Gervais, Toronto, ON (Canada); Taylor, R. [Hydro One Networks Inc., Markham, ON (Canada)

    2003-05-01

    This session presented highlights of the comments of 8 panelists who discussed the issue of contract design. The new electricity market in Ontario has introduced the energy trader, who enters into a contract with the consumer, based on the spot price set by the Independent Electricity Market Operator. Every contract has a fixed price payer as well as floating-price payers. If the floating price for a given amount of energy is higher than the fixed price, then the consumer gets the difference. Confusion, however, arises with the purchase of retail physical power in the market, particularly in deciding a fixed rate that the consumer will be paying. Different billing options were also discussed with emphasis on mid to large retail customers that have portfolios in the tens of MW and up to 100 MW or more. figs.

  19. Panel discussion : contract design

    International Nuclear Information System (INIS)

    Vallas, A.; Vegh, G.; McGee, M.; Zaremba, T.; Seshan, A.; Harricks, P.; Bertoldi, L.; Taylor, R.

    2003-01-01

    This session presented highlights of the comments of 8 panelists who discussed the issue of contract design. The new electricity market in Ontario has introduced the energy trader, who enters into a contract with the consumer, based on the spot price set by the Independent Electricity Market Operator. Every contract has a fixed price payer as well as floating-price payers. If the floating price for a given amount of energy is higher than the fixed price, then the consumer gets the difference. Confusion, however, arises with the purchase of retail physical power in the market, particularly in deciding a fixed rate that the consumer will be paying. Different billing options were also discussed with emphasis on mid to large retail customers that have portfolios in the tens of MW and up to 100 MW or more. figs

  20. Adding Concurrency to Smart Contracts

    OpenAIRE

    Dickerson, Thomas; Gazzillo, Paul; Herlihy, Maurice; Koskinen, Eric

    2017-01-01

    Modern cryptocurrency systems, such as Ethereum, permit complex financial transactions through scripts called smart contracts. These smart contracts are executed many, many times, always without real concurrency. First, all smart contracts are serially executed by miners before appending them to the blockchain. Later, those contracts are serially re-executed by validators to verify that the smart contracts were executed correctly by miners. Serial execution limits system throughput and fails ...

  1. Is Contract Law Necessary?

    OpenAIRE

    SCHWARTZ, Alan

    2010-01-01

    This lecture was delivered on 17 March 2010. Alan Schwartz, Sterling Professor of Law; Professor of Management, Yale University This Lecture argues that much of the contract law in the cases (the US, the UK and Canada) and in the codes (Europe and Latin America) is unnecessary. To say that a law is unnecessary is to say that it does not perform a useful social function. The argument below thus sets out the functions that contract laws today are thought to serve, and then shows that many of...

  2. Culture and Contract Laws

    DEFF Research Database (Denmark)

    Lando, Ole

    2007-01-01

    In the article it is argued that the wish to preserve the cultural values of national law should not prevent the EU from preparing a Code or an Optional Instrument. The no-code countries on the British Isles and in Scandinavia are the most ardent opponents to the idea of unifying European Contract...... Law by way of a code on Contracts. In both these regions however the absence of a code causes problems. In England a prominent writer has found that the major weakness of the judge-made law is its immense diffusion and the consequent difficulty of access to it and the Nordic countries face the same...

  3. Do contracts help?

    DEFF Research Database (Denmark)

    Tumennasan, Norovsambuu

    Economists perceive moral hazard as an undesirable problem because it undermines efficiency. Carefully designed contracts can mitigate the moral hazard problem, but this assumes that a team is already formed. This paper demonstrates that these contracts are sometimes the reason why teams do...... transfers, then moral hazard affects stability positively in a large class of games. For example, a stable team structure exists if teams produce public goods or if the quota is two. However, these existence results no longer hold if efforts are verifiable....

  4. Statutes and contracts

    DEFF Research Database (Denmark)

    Trosborg, Anna

    1995-01-01

    and commissive acts. The findings show that the language of the law characteristically selects patterns of regulative distinct from, for example, the patterns typically selected in everyday conversational English. The characteristics of the language of the law can be interpreted within the adherence to legal......This paper is concerned with the language used in legal speech acts in legislative texts and contracts in the field of English Contract Law. The central objects of study are regulative functions with a particular view to establishing realization patterns of the rhetorical functions of directive...

  5. Consensus, contracts, and committees.

    Science.gov (United States)

    Moreno, J D

    1991-08-01

    Following a brief account of the puzzle that ethics committees present for the Western Philosophical tradition, I will examine the possibility that social contract theory can contribute to a philosophical account of these committees. Passing through classical as well as contemporary theories, particularly Rawls' recent constructivist approach, I will argue that social contract theory places severe constraints on the authority that may legitimately be granted to ethics committees. This, I conclude, speaks more about the suitability of the theory to this level of analysis than about the ethics committee phenomenon itself.

  6. Reviewing the Relationship between Human Resource Practices and Psychological Contract and Their Impact on Employee Attitude and Behaviours: A Conceptual Model

    Science.gov (United States)

    Aggarwal, Upasana; Bhargava, Shivganesh

    2009-01-01

    Purpose: The purpose of this paper is to review and synthesise literature on the role of human resource practices (HRP) in shaping employee psychological contract (PC). Based on this review, a conceptual framework for examining the relationship between HRP and PC and their impact on employee attitudes as well as behaviour has been put forward for…

  7. Incomplete Contract and Divisional Structures

    OpenAIRE

    Bao, T.; Wang, Y.

    2009-01-01

    In this paper we want to analyze the internal divisional structure within an organi- zation in the framework of incomplete contract theory. We use the framework of Aghion and Tirole (1997) and define the managerial control structure as \\sequence of search". A key feature of this paper which differentiate it from other works in the literature is that we add add an ex post bargaining phase in which the managers can agree on the project which maximize their joint private benefit. Our model shows...

  8. Contracted and expanded integrable structures

    International Nuclear Information System (INIS)

    Doikou, Anastasia; Sfetsos, Konstadinos

    2009-01-01

    We propose a generic framework to obtain certain types of contracted and centrally extended algebras. This is based on the existence of quadratic algebras (reflection algebras and twisted Yangians), naturally arising in the context of boundary integrable models. A quite old misconception regarding the 'expansion' of the E 2 algebra into sl 2 is resolved using the representation theory of the aforementioned quadratic algebras. We also obtain centrally extended algebras associated with rational and trigonometric (q-deformed) R-matrices that are solutions of the Yang-Baxter equation.

  9. Partnering and contracting

    DEFF Research Database (Denmark)

    Bohnstedt, Kristian Ditlev

    2014-01-01

    Purpose - Partnering is often, by economists, and construction managerial literature related to more incomplete contracts. This can be explained by seeing partnering as something that neutralizes opportunism. The aim is to uncover whether partnering neutralizes opportunism when there is an incomp...

  10. Turn key contracts

    International Nuclear Information System (INIS)

    Feretic, D.

    1975-01-01

    The aim of this summary is to point out some specific areas which have to be covered in a turn-key contract and which are of primarily interest to the buyer of a nuclear plant. It will be assumed that the buyer is utility company in a developing country and a plant supplier a company in an industrial country. (orig./FW) [de

  11. Startpoints via weak contractions

    OpenAIRE

    Agyingi, Collins Amburo; Gaba, Yaé Ulrich

    2018-01-01

    Startpoints (resp. endpoints) can be defined as "oriented fixed points". They arise naturally in the study of fixed for multi-valued maps defined on quasi-metric spaces. In this article, we give a new result in the startpoint theory for quasi-pseudometric spaces. The result we present is obtained via a generalized weakly contractive set-valued map.

  12. Copyright or Contract?

    Science.gov (United States)

    Okerson, Ann

    1997-01-01

    Most authors and publishers of electronic information believe that current copyright law does not address technical capabilities or reader uses and have turned to contracts or licenses to define the rights of owners and users. Discusses copyrights, fair use, and licenses and highlights licensing's unresolved issues: use and users; archiving;…

  13. Supporting the diversity of B2B e-contracting processes

    NARCIS (Netherlands)

    Angelov, S.A.; Grefen, P.W.P.J.

    2008-01-01

    Contracts specify the rights and obligations of the contracting parties. Information technologies can make e-contracting more efficient and effective. A process model for flexible B2B e-contracting is proposed that separates concerns by distinguishing function and communication perspectives of

  14. Options for change in the NHS consultant contract.

    Science.gov (United States)

    Clarke, R W; Gray, C

    The lead negotiators for the management and consultant sides in an NHS trust in northern England responded to debate in their trust about consultant contracts by offering to research the attitudes of their peers towards a variety of contract options. The options tested included the current contract; models already examined in the trust and elsewhere, such as time sensitive and mild performance related contracts; and some more radical and speculative possibilities, including consultants franchising their services to the trust. Beyond the predictable conclusion that consultants would prefer no change while managers desired it, a time sensitive contract emerged as having potential for successful negotiation. On the other hand, neither consultants nor managers favoured a strict performance related contract or a fee for service contract. There was a strong similarity of opinion between the two groups on the relative salary values of the options, though the consultants consistently priced these higher than the managers.

  15. Employee contract issues for dermatologists.

    Science.gov (United States)

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  16. Reconciling Contracts and Relational Governance through Strategic Contracting

    DEFF Research Database (Denmark)

    Petersen, Bent; Østergaard, Kim

    2018-01-01

    on contract types, such as strategic versus conventional, may reconcile the enduring research controversy between the substitution and complements perspectives. Practical implications: Today, formal contracts with foreign distributors tend to resemble “prenuptial agreements”. The opportunity for relational...

  17. Bilateral electric energy contracts: return and risk

    Energy Technology Data Exchange (ETDEWEB)

    Gunn, Laura K.; Silva, Elisa B.; Correia, Paulo B. [State University of Campinas (UNICAMP), SP (Brazil). College of Mechanical Engineering

    2009-07-01

    In Brazil electricity is traded through three segments: the spot market that balances offer and demand, with prices calculated by a cost-based computational model; the regulated market , where prices are settled in public auctions, and the free market for bilateral contracts. As spot and regulated market prices are public information, a seller is able to calculate his opportunity price to trade a bilateral contract in the free market by using the non-arbitrage principle. Thus, the seller searches the price of a bilateral contract in the free market that balances his/her revenues with the value expected in case it were negotiated in the regulated and the spot market. Besides the expected revenue, the seller may also consider the CVaR to measure the risk of her/his bilateral contract in the free market. So this paper develops a binomial lattice approach to price bilateral contracts in the free market, considering the seller's opportunity of negotiations in both regulated and spot markets, and measuring the contract risk directly. (author)

  18. Contracting with the Enemy: The Contracting Officer’s Dilemma

    Science.gov (United States)

    2015-06-01

    contracting command xv KO contracting officer KTR contractor LSC lead service component MGAA Mesopotamia Group Atlas Apache NAT National Afghanistan...and Contract Authority Understanding the roles of contracting versus command authority and command relationships is a fundamental that must be...Audit 12-7 (2012) described the CENTCOM-JTSCC (C- JTSCC) formation and command relationship : In April 2010, CENTCOM issued a fragmentary order to

  19. Particle swarm optimization and genetic algorithm as feature selection techniques for the QSAR modeling of imidazo[1,5-a]pyrido[3,2-e]pyrazines, inhibitors of phosphodiesterase 10A.

    Science.gov (United States)

    Goodarzi, Mohammad; Saeys, Wouter; Deeb, Omar; Pieters, Sigrid; Vander Heyden, Yvan

    2013-12-01

    Quantitative structure-activity relationship (QSAR) modeling was performed for imidazo[1,5-a]pyrido[3,2-e]pyrazines, which constitute a class of phosphodiesterase 10A inhibitors. Particle swarm optimization (PSO) and genetic algorithm (GA) were used as feature selection techniques to find the most reliable molecular descriptors from a large pool. Modeling of the relationship between the selected descriptors and the pIC50 activity data was achieved by linear [multiple linear regression (MLR)] and non-linear [locally weighted regression (LWR) based on both Euclidean (E) and Mahalanobis (M) distances] methods. In addition, a stepwise MLR model was built using only a limited number of quantum chemical descriptors, selected because of their correlation with the pIC50 . The model was not found interesting. It was concluded that the LWR model, based on the Euclidean distance, applied on the descriptors selected by PSO has the best prediction ability. However, some other models behaved similarly. The root-mean-squared errors of prediction (RMSEP) for the test sets obtained by PSO/MLR, GA/MLR, PSO/LWRE, PSO/LWRM, GA/LWRE, and GA/LWRM models were 0.333, 0.394, 0.313, 0.333, 0.421, and 0.424, respectively. The PSO-selected descriptors resulted in the best prediction models, both linear and non-linear. © 2013 John Wiley & Sons A/S.

  20. On the Specification of Full Contracts

    DEFF Research Database (Denmark)

    Okika, Joseph; Ravn, Anders Peter; Fenech, Stephen

    2009-01-01

    Contracts specify properties of an interface to a software component. We consider the problem of de ning a full contract that speci es not only the normal behaviour, but also special cases and tolerated exceptions. In this paper we focus on the behavioural properties of use cases taken from...... the Common Component Modelling Example (CoCoME), proposed as a benchmark to compare di erent component models. We rst give the full speci cation of the use cases in the deontic-based speci cation language CL, and then we concentrate on three particular properties in order to compare deontic and operational...

  1. The Antarctica component of postglacial rebound model ICE-6G_C (VM5a) based on GPS positioning, exposure age dating of ice thicknesses, and relative sea level histories

    Science.gov (United States)

    Argus, Donald F.; Peltier, W. R.; Drummond, R.; Moore, Angelyn W.

    2014-07-01

    A new model of the deglaciation history of Antarctica over the past 25 kyr has been developed, which we refer to herein as ICE-6G_C (VM5a). This revision of its predecessor ICE-5G (VM2) has been constrained to fit all available geological and geodetic observations, consisting of: (1) the present day uplift rates at 42 sites estimated from GPS measurements, (2) ice thickness change at 62 locations estimated from exposure-age dating, (3) Holocene relative sea level histories from 12 locations estimated on the basis of radiocarbon dating and (4) age of the onset of marine sedimentation at nine locations along the Antarctic shelf also estimated on the basis of 14C dating. Our new model fits the totality of these data well. An additional nine GPS-determined site velocities are also estimated for locations known to be influenced by modern ice loss from the Pine Island Bay and Northern Antarctic Peninsula regions. At the 42 locations not influenced by modern ice loss, the quality of the fit of postglacial rebound model ICE-6G_C (VM5A) is characterized by a weighted root mean square residual of 0.9 mm yr-1. The Southern Antarctic Peninsula is inferred to be rising at 2 mm yr-1, requiring there to be less Holocene ice loss there than in the prior model ICE-5G (VM2). The East Antarctica coast is rising at approximately 1 mm yr-1, requiring ice loss from this region to have been small since Last Glacial Maximum. The Ellsworth Mountains, at the base of the Antarctic Peninsula, are inferred to be rising at 5-8 mm yr-1, indicating large ice loss from this area during deglaciation that is poorly sampled by geological data. Horizontal deformation of the Antarctic Plate is minor with two exceptions. First, O'Higgins, at the tip of the Antarctic Peninsula, is moving southeast at a significant 2 mm yr-1 relative to the Antarctic Plate. Secondly, the margins of the Ronne and Ross Ice Shelves are moving horizontally away from the shelf centres at an approximate rate of 0.8 mm yr-1, in

  2. Contracting in a Foreign Country

    National Research Council Canada - National Science Library

    Rodeschin, Darrin

    1997-01-01

    .... This thesis investigates and compares the different contracting structures of the U.S. Army, the UN, and Apple as well as the duties and responsibilities of the contracting individuals within these organizations...

  3. Utility Energy Services Contracts Guide

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    The UESC Guide is a compilation of samples and templates developed as a resource to help contracting officers implement task orders for UESCs under existing U.S. General Services Administration areawide contracts.

  4. Automatic Conflict Detection on Contracts

    Science.gov (United States)

    Fenech, Stephen; Pace, Gordon J.; Schneider, Gerardo

    Many software applications are based on collaborating, yet competing, agents or virtual organisations exchanging services. Contracts, expressing obligations, permissions and prohibitions of the different actors, can be used to protect the interests of the organisations engaged in such service exchange. However, the potentially dynamic composition of services with different contracts, and the combination of service contracts with local contracts can give rise to unexpected conflicts, exposing the need for automatic techniques for contract analysis. In this paper we look at automatic analysis techniques for contracts written in the contract language mathcal{CL}. We present a trace semantics of mathcal{CL} suitable for conflict analysis, and a decision procedure for detecting conflicts (together with its proof of soundness, completeness and termination). We also discuss its implementation and look into the applications of the contract analysis approach we present. These techniques are applied to a small case study of an airline check-in desk.

  5. Vitex agnus-castus dry extract BNO 1095 (Cyclodynon®) inhibits uterine hyper-contractions and inflammation in experimental models for primary dysmenorrhea

    OpenAIRE

    Röhrl, J.; Werz, O.; Ammendola, A.; Künstle, G.

    2017-01-01

    Background. For many women, the monthly suffering induced by menstrual “cramps” is severe enough to profoundly disrupt their quality of life. In the case of primary dysmenorrhea, a condition related to premenstrual syndrome (PMS), intense uterine contractions are thought to trigger moderate to intense pain despite the absence of an underlying infection or other medically-identifiable disease states. The associated uterine hyper-contractility is reminiscent of labor, and associated pain is lik...

  6. Energy contracting in Switzerland

    International Nuclear Information System (INIS)

    Muggli, C.

    2000-01-01

    The article discusses the status of energy contracting in Switzerland and compares it with the situation in USA, Germany and France, where it has been standard practice for many years. The fact that this financing and operating instrument is not widely used in Switzerland in spite of its benefits for users and suppliers is discussed, as are the obstacles placed in its way. The results of a study made by the Federal Office of Energy are presented, whereby some 220 existing contracting arrangements with a total investment volume of around CHF 200 million were noted and a further potential of around CHF 1.1 billion estimated. The author notes that in order to utilise this potential, great efforts must be made by all parties involved

  7. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  8. Contracting for Complex Products

    Science.gov (United States)

    2010-05-01

    asymmetries, and barriers to market entry and exit (e.g., Mankiw , et al., 2002). Goods may be non-rivalrous or non-excludable so that transferable property...investments. Expenditures are asset specific to the extent they have no economic value outside the product being produced (Williamson, 2005). For...example, some research in the US space program produced economic value outside the contract (e.g., Tang), while other research produced little value

  9. Contract types - turnkey

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    Turnkey or the turnkey type of contract refers to a system of management according to which one organization accepts total responsibility for completing all parts and all phases of a project. In the case of a power project the turnkey contractor undertakes to design the plant, supply or procure and erect the equipment, build the station and put it into operation. (orig./FW) [de

  10. Between Status and Contract?

    Directory of Open Access Journals (Sweden)

    Thorsten Keiser

    2013-01-01

    Full Text Available This contribution deals with unfree labour in Germany from the early modern age until the beginning of the 20th century. It presents the main conclusions of a book published in 2013 on this subject in German. Unfree labour is not identified in the first place with slavery or any other labour relationship based on status. Instead, this study aims at an analysis of freedom and coercion in contractual labour relationships. It will be argued that in Germany contractual labour relationships before 1800 were embedded in a legal system that strongly restricted contractual autonomy and aimed at the suppression of free labour markets. The scope of this legislation was to guarantee efficient labour performance, which was not only perceived as being in the personal interest of an employer, but as a fundamental element of the common good. After 1800 the system changed to more incentive-based legislation that established freedom of contract for labour relations. Nevertheless, coercion in order to perform the contractual duties of a work contract remained important for many groups of workers, especially farmhands and industrial workers. The last criminal sanctions for breaches of labour contracts were only abolished in the revolution of 1919. This development shows the difficulties German law had in extending the principles of private law to workers. When a system of free labour was fully established, the issue of unemployment and economic problems, especially in the Weimar Republic, required a new system of protective rules. The history of free market based labour contracts in Germany was therefore very short, with state intervention shi ing from control and coercion to social assistance.

  11. The interpretation of administrative contracts

    Directory of Open Access Journals (Sweden)

    Cătălin-Silviu SĂRARU

    2014-06-01

    Full Text Available The article analyzes the principles of interpretation for administrative contracts, in French law and in Romanian law. In the article are highlighted derogations from the rules of contract interpretation in common law. Are examined the exceptions to the principle of good faith, the principle of common intention (willingness of the parties, the principle of good administration, the principle of extensive interpretation of the administrative contract. The article highlights the importance and role of the interpretation in administrative contracts.

  12. Exit from contract

    Directory of Open Access Journals (Sweden)

    Oren Bar-Gill

    2016-01-01

    Full Text Available Objective to study the procedure of exiting the contract its costs and benefits. Methods statistical method comparative analysis. Results free exit from contract is one of the most powerful tools for the consumer rights protection. The procedure frees consumers from bad deals and keeps businesses honest. Yet consumers often choose transactions with lockin provisions trading off exit rights for other perks. This article examines the costs and benefits of free exit as compared to the lockin alternative. According to the authors the present regulation of exit penalties in the USA is poorly tailored to address concerns about lockin particularly in light of increasingly ubiquitous marketbased solutions. The article also calls regulatory attention to loyalty rewards which are shown to be as powerful as exit penalties and equally detrimental. Scientific novelty the article reveals a paradoxical state of the law exit regulations in the USA are used most where they are needed least. Termination penalties present an obvishyous target for regulatory intervention while loyalty programs seem benign not warranting any regulatory attention. Practical significance the article is of interest for the Russian juridical science and lawmaking authorities as in Russia the issue of exiting the contract is as topical as in the USA and requires solution which would impair neither the rights of consumers nor the rights of the sellers ofnbspproducts and services. nbsp

  13. CONTRACT FOLLOW UP TRAINING

    CERN Multimedia

    Technical Training; Tel. 74460

    2001-01-01

    SPL is organizing Training Sessions on the Contract Follow Up application. CFU is a Web based tool, developped and supported by the Administrative Information Services. It allows the creation of Divisional Requests and the follow up of their processing, from the Market Survey to the Invitation to Tender or Price Enquiry, approval by the Finance Committee, up to the actual signature of a Contract, acccording to the CERN Purchasing procedures. It includes a document management component. It also provides link with other AIS applications such as BHT and EDH. The course is primarily intended for DPOs, Contract Technical responsibles in the division and their assistants, but is beneficial to anybody involved in the follow up of such Purchasing Procedures. This course is free of charge, but application is necessary. The details of the course may be found at http://training.web.cern.ch/Training/ENSTEC/P2001/Bureautique/cfu4_f.htm General information of CFU may be found at http://ais.cern.ch/apps/cfu/ The dates of t...

  14. Non-turnkey contract

    International Nuclear Information System (INIS)

    Shimoyama, Shunji

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face with troubles and difficulties during construction of the first nuclear power station, she might have chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf. (orig./FW) [de

  15. Non-turnkey contract

    Energy Technology Data Exchange (ETDEWEB)

    Shimoyama, S

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face troubles and difficulties during construction of the first nuclear power station, she might have a chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf.

  16. Practical guide on contract of technology

    International Nuclear Information System (INIS)

    Choi, Chiho

    1991-12-01

    This book gives descriptions of practical guide on contract of technology, which deals with basic of contract like meaning, function term, singing and sealing, contract and stamp tax, common things on contract of research like keeping secret and prevention and treat of dispute, compensation for damages, notice, expiration date of contract and measurement at end of contract, contract of joint research such as meaning and necessity, note at contract, check list at contract, and return of the research product.

  17. Effects of the gastric juice injection pattern and contraction frequency on the digestibility of casein powder suspensions in an in vitro dynamic rat stomach made with a 3D printed model.

    Science.gov (United States)

    Zhang, Xiaoai; Liao, Zhenkai; Wu, Peng; Chen, Liding; Chen, Xiao Dong

    2018-04-01

    Previously, we have prepared a version of the dynamic in vitro rat stomach system (DIVRS-II or Biomimic Rat II). It was constructed and tested by showing similar digestive behaviors with those occurred in vivo. In the present work, a 3D-printed plastic mold was employed to create highly repeatable silicone rat stomach model. It has been seen to have shortened the time to handcraft a model like that used in DIVRS-II. The maximum mechanical force of the current stomach model generated by rolling extrusion is found to be more stable probably due to the more uniform wall thickness of the new model. Then the effects of the simulated gastric secretion patterns and contraction frequency of the system on the in vitro digestibility of casein powder suspensions were investigated. The results have shown that the location of the gastric secretion injection has an impact on experimental digestibility. The position of rolling-extrusion area, established at the central part of glandular portion (stomach B), displayed the highest digestibility compared to that at the other locations. Furthermore, the extent of digestion was positively correlated with the contraction frequency of the model stomach system, with the maximum frequency of 12cpm giving the highest digestibility. This highest digestibility is almost the same as the average value found in vivo. The better digestive performance produced by optimizing the gastric secretion pattern and contraction frequency may be both resulted from the improved mixing efficiency of the food matrix with digestive juice. This study shows that it is possible to achieve what in vivo in a simulated digestion device, which may be used for future food and nutrition studies in vitro. Copyright © 2018 Elsevier Ltd. All rights reserved.

  18. Why radiologists lose their hospital contracts: is your contract secure?

    Science.gov (United States)

    Muroff, Lawrence R

    2010-03-01

    Previously, a hospital contract meant tenure for the incumbent group of radiologists; however, those days are long gone. Exclusive contracts have morphed into exclusive contracts with carve-outs. Turf erosion has become a fact of life for radiology practices. Now radiologists are losing their hospital contracts in record numbers. Group size, though helpful for a variety of reasons, does not ensure that a practice will be secure in its hospital setting. The reasons that groups lose their hospital contracts are varied, and in this paper, the author discusses the most common ones. Suggestions to help practices avoid this unfortunate fate are presented.

  19. An application of the Rayleigh distribution to contract cost data

    OpenAIRE

    Abernethy, Thomas S.

    1984-01-01

    Approved for public release; distribution unlimited Accurate cost models are essential to the proper monitoring of contract cost data. The greater the accuracy of the model, the earlier contract cost overruns can be recognized and their cause(s) ascertained. The availability of a variety of cost models allows flexibility in choosing the correct model for the particular circumstances and increases the chances of being able to select a model that can provide reliable forecasts about future c...

  20. Contracting between firms: empirical evidence

    NARCIS (Netherlands)

    Iyer, R.; Sautner, Z.

    2014-01-01

    We analyse 185 contracts signed between a buyer and 89 suppliers to test how moral-hazard and hold-up problems affect contract design. Our data allow us to study both static and dynamic effects. If a supplier’s products are more critical to the buyer, contracts contain more clauses that address

  1. Static Verification for Code Contracts

    Science.gov (United States)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  2. Transnational Law of Public Contracts

    NARCIS (Netherlands)

    Audit, M.; Schill, S.W.

    2016-01-01

    Public contracts were traditionally conceived as instruments of domestic public law and used within markets confined to the territory of the state party to the contract. Globalization, however, subjects public contracting to an increasing number of processes that take place at a transnational level

  3. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  4. Lack of symmetry in employees' perceptions of the psychological contract.

    Science.gov (United States)

    Jepsen, Denise M; Rodwell, John J

    2012-06-01

    Despite debate on the nature of employees' perceptions of their psychological contract, little research has compared employees' and employers' sides of the psychological contract. All 80 items from both scales in the Psychological Contract Inventory were used in a survey of 436 currently working, non-student respondents. Structural equation modeling yielded nonsymmetrical perspectives on promises and obligations, highlighting the validity of approaching the issues via individual perceptions.

  5. On the equivalence of selected supply chain contract mechanism

    OpenAIRE

    Nalla, V.R.; Venugopal, V.; Veen, van der, J.A.A.

    2005-01-01

    This paper models a situation where a Supplier sells a fashion product to a Buyer who in turn sells the product to the consumers. Both the Supplier and the Buyer set their own selling price. For the above setting this paper designs different contract mechanisms such as Revenue sharing, Profit sharing, Quantity discounts, License fee and Mail-in-rebate contract mechanisms. The paper shows that the designed contract mechanism can provide both coordination and win-win. The paper also establishes...

  6. On the equivalence of selected supply chain contract mechanisms

    OpenAIRE

    Vijayender Reddy Nalla; Jack A.A. van der Veen; Venu Venugopal

    2005-01-01

    This paper models a situation where a Supplier sells a fashion product to a Buyer who in turn sells the product to the consumers. Both the Supplier and the Buyer set their own selling price. For the above setting this paper designs different contract mechanisms such as Revenue sharing, Profit sharing, Quantity discounts, License fee and Mail-in-rebate contract mechanisms. The paper shows that the designed contract mechanism can provide both coordination and win-win. The paper also establishes...

  7. Human, Social, Cultural Behavior (HSCB) Modeling Workshop I: Characterizing the Capability Needs for HSCB Modeling

    Science.gov (United States)

    2008-07-01

    The expectations correspond to different roles individuals perform SocialConstructionis Social constructionism is a school of thought Peter L...HUMAN, SOCIAL , CULTURAL BEHAVIOR (HSCB) MODELING WORKSHOP I: CHARACTERIZING THE CAPABILITY NEEDS FOR HSCB MODELING FINAL REPORT... Social , Cultural Behavior (HSCB) Modeling Workshop I: Characterizing the Capability Needs for HSCB Modeling 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c

  8. Development and perspectives of principles of european insurance contract law

    Directory of Open Access Journals (Sweden)

    Ana Keglević

    2013-01-01

    Full Text Available Summary: Principles of European Insurance Contract Law (PEICL provides for a set of principles, definitions and model rules exclusively addressing general law for insurance contract. This work has been preformed within greater project for the creation of Common frame of reference on European contract law initiated by the Commission in 2003. PEICL is essentially designed to perform two basic functions. It would improve the quality of the EU acquis in the area of contract law, remove differences and achieve higher degree of divergences between contract laws of the Member states, and even help the national legislators when enacting legislation or Courts with the possible interpretation of the acquis. On the other hand PEICL could be adopted as an optional instrument, thus offering the common platform for contracting in the area of insurance law on the EU level. Possible Optional instrument would exist parallel with, rather instead of, national insurance contract laws. European Parliament resolution of 2011 on policy options for progress towards a European Contract Law for consumers and businesses and corresponding Green Paper of 2010 show positive tendency towards optional instrument in the legal form of Regulation. This would suit the requirements of the insurance sector. However, there are numerous signals showing adversely. For that reason this paper analyses the development and the status of Principles of European Insurance Contract Law particularly the status and perspectives of Principles within the project for the creation of European contract law.

  9. Muscle contraction and force

    DEFF Research Database (Denmark)

    Brüggemann, Dagmar Adeline; Risbo, Jens; Pierzynowski, Stefan G.

    2008-01-01

    Muscle contraction studies often focus solely on myofibres and the proteins known to be involved in the processes of sarcomere shortening and cross-bridge cycling, but skeletal muscle also comprises a very elaborate ancillary network of capillaries, which not only play a vital role in terms...... of nutrient delivery and waste product removal, but are also tethered to surrounding fibres by collagen "wires". This paper therefore addresses aspects of the ancillary network of skeletal muscle at both a microscopic and functional level in order to better understand its role holistically as a considerable...

  10. Bunker purchasing with contracts

    DEFF Research Database (Denmark)

    Plum, Christian Edinger Munk; Neergaard Jensen, Peter; Pisinger, David

    2014-01-01

    The cost for bunker fuel represents a major part of the daily running costs of liner shipping vessels. The vessels, sailing on a fixed roundtrip of ports, can lift bunker at these ports, having differing and fluctuating prices. The stock of bunker on a vessel is subject to a number of operational...... optimally to reduce overall costs. The Bunker Purchasing with Contracts Problem has been formulated as a mixed integer programme, which has been Dantzig-Wolfe decomposed. To solve it, a novel column generation algorithm has been developed. The algorithm has been run on a series of real-world instances...

  11. Contractions from grading

    Science.gov (United States)

    Krishnan, Chethan; Raju, Avinash

    2018-04-01

    We note that large classes of contractions of algebras that arise in physics can be understood purely algebraically via identifying appropriate Zm-gradings (and their generalizations) on the parent algebra. This includes various types of flat space/Carroll limits of finite and infinite dimensional (A)dS algebras, as well as Galilean and Galilean conformal algebras. Our observations can be regarded as providing a natural context for the Grassmann approach of Krishnan et al. [J. High Energy Phys. 2014(3), 36]. We also introduce a related notion, which we call partial grading, that arises naturally in this context.

  12. Tendering specification and contracting

    International Nuclear Information System (INIS)

    Koch, E. von

    1975-01-01

    The lecture tendering, specification and contracting is prepared in two parts: This first part deals with technical aspects while part two features the commercial and legal situation in the partnership of two: the supplier of the fuel bundles and the utility. In this lecture a look is given on the way how a supplier can offer its fuel and some certain points are mentioned which are important to compare the bid of one competitor to the other. The major points are summarized which are or at least should be in an offer so as to find out which offer is the best. (orig./FW) [de

  13. The Danish Contracting System

    DEFF Research Database (Denmark)

    Bonke, Sten; Levring, Peter

    The paper is mainly concerned with the institutional framework of the Danish construction industry, describing structures, rules and actors' roles within a perspective of nationally defined procedural guidelines on construction projects. These aspects are treated under the concept of a "contracting...... system". After a short introduction to the structure and activities of the industry the post-war development is reviewed, in particular emphasising the importance of the early industrialisation process which in an international perspective represents quite unique features. Furthermore the most recent...

  14. A Business Case for Home Performance Contracting

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.; Antonopoulos, Chrissi A.; Sevigny, Maureen; Gilbride, Theresa L.; Hefty, Marye G.

    2012-10-01

    This report was prepared by PNNL for the DOE Building America program. The report provides information for businesses considering entering the home performance contracting industry. Metrics discussed include industry trends and drivers, specific points of entry, business models, startup costs, and marketing strategies. The report includes detailed analysis of eight businesses around the country that have successfully entered the home performance contracting industry. Data is provided on their financial structures, program participation, marketing efforts, and staff training. This report will be distributed via the DOE Building America website, www.buildingamerica.gov. Individual case studies will also be cleared separately.

  15. The economics of energy service contracts

    Energy Technology Data Exchange (ETDEWEB)

    Sorrell, S. [University of Sussex, Brighton (United Kingdom). Sussex Energy Group, SPRU -Science and Technology Policy Research

    2007-01-15

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transaction cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the competitiveness of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test. (author)

  16. The economics of energy service contracting

    Energy Technology Data Exchange (ETDEWEB)

    Sorrell, Steve [Univ. of Sussex (United Kingdom). SPRU

    2005-07-01

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transactions cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the 'contestability' of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test.

  17. The economics of energy service contracts

    International Nuclear Information System (INIS)

    Sorrell, Steve

    2007-01-01

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transaction cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the competitiveness of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test

  18. IPP fuel contracts - creating certain contracts for uncertain times

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, I. [Coddington International Pty. Ltd., Milsons Point, NSW (Australia)

    1998-12-31

    Coal contracts for the new Asian Independent Power Producers (IPPs) are examined. Since most IPPs will be selling to state electricity utilities, often in competition with power plant using other fuels, coal based IPPs must negotiate advantageous coal supply contracts several years before the commissioning of a plant, and must ensure security of supply for at least the life of the construction loan. A more recent trend in the developed world is the Merchant IPP, where there is no guaranteed electricity sale. Lenders are wary of IPPs relying an imported coal, and insist on binding fuel contracts, while coal companies are wary of the quantity of information demanded by these lenders. A full understanding of the risks involved is needed; and a method of price indexation for the contracts. Contracts must also specify security of supply, coal quality, freight contracts and other details. 2 figs.

  19. Characteristics of nuclear contracts. Pt. 1

    International Nuclear Information System (INIS)

    Blanchard, R.

    1976-01-01

    While the object of nuclear contracts is specific, these contracts are concluded according to proven techniques based on general regulations on contracts. Following a review of contract classification, they are differentiated according to the nature of the co-contracting parties, the purpose of the contract itself, the procedure for drawing up the contracts, and payment. The operations prior to the contract vary in that they may include a call for tenders, an option for delays or a letter of intent. (NEA) [fr

  20. 48 CFR 315.371 - Contract preparation and award.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 315.371 Contract... the contract until the finance office certifies that the funds are available for obligation. ...

  1. TraceContract

    Science.gov (United States)

    Kavelund, Klaus; Barringer, Howard

    2012-01-01

    TraceContract is an API (Application Programming Interface) for trace analysis. A trace is a sequence of events, and can, for example, be generated by a running program, instrumented appropriately to generate events. An event can be any data object. An example of a trace is a log file containing events that a programmer has found important to record during a program execution. Trace - Contract takes as input such a trace together with a specification formulated using the API and reports on any violations of the specification, potentially calling code (reactions) to be executed when violations are detected. The software is developed as an internal DSL (Domain Specific Language) in the Scala programming language. Scala is a relatively new programming language that is specifically convenient for defining such internal DSLs due to a number of language characteristics. This includes Scala s elegant combination of object-oriented and functional programming, a succinct notation, and an advanced type system. The DSL offers a combination of data-parameterized state machines and temporal logic, which is novel. As an extension of Scala, it is a very expressive and convenient log file analysis framework.

  2. Contracts in Public Administration

    Directory of Open Access Journals (Sweden)

    Agnieszka GRZESIOK-HOROSZ

    2011-03-01

    Full Text Available Objectives: The present makes a contribution to the discussion on contracts in administration under Polish law. It concentrates on theoretical issues, but ones of considerable practical significance. Prior Work though relatively poorly explored, field. This paper is a result of academic considerations on the classical institution of civil law, namely a bilateral juridical act significance of this area may be demonstrated by the fact that one scientific conference and a collection of papers have been devoted to contracts in administration. as research method, the analysis of jurisprudence and doctrinal writings referring to law currently in force. The paper discusses as well the draft of the administrative law, and includes comparative remarks. put forward certain comments pertainin legislation. The authors formulate as well outline theses interesting but complicated matters. As a voice in the doctrinal dispute it can als useful for law students. Value composition. Starting from gener the binding law and proposed amendments. The functioning in foreign countries and proposals of regulatory solutions.

  3. UKAEA'S evolving contract philosophy

    International Nuclear Information System (INIS)

    Nicol, R. D.

    2003-01-01

    The United Kingdom Atomic Energy Authority (UKAEA) has gone through fundamental change over the last ten years. At the heart of this change has been UKAEA's relationship with the contracting and supply market. This paper describes the way in which UKAEA actively developed the market to support the decommissioning programme, and how the approach to contracting has evolved as external pressures and demands have changed. UKAEA's pro-active approach to industry has greatly assisted the development of a healthy, competitive market for services supporting decommissioning in the UK. There have been difficult changes and many challenges along the way, and some retrenchment was necessary to meet regulatory requirements. Nevertheless, UKAEA has sustained a high level of competition - now measured in terms of competed spend as a proportion of competable spend - with annual out-turns consistently over 80%. The prime responsibility for market development will pass to the new Nuclear Decommissioning Authority (NDA) in 2005, as the owner, on behalf of the Government, of the UK's civil nuclear liabilities. The preparatory work for the NDA indicates that the principles established by UKAEA will be carried forward. (author)

  4. Joint-liability with endogenously asymmetric group loan contracts

    NARCIS (Netherlands)

    Carli, Francesco; Uras, Burak R.

    Group lending is a common practice that Microfinance Institutions (MFIs) utilize when lending to individuals without collateral. We develop a multi-agent principal-agent model with costly peer monitoring and solve for the optimal group loan contract. The optimal contract exhibits (i) a

  5. Monitoring multi-party contracts for E-business

    NARCIS (Netherlands)

    Xu, L.

    2004-01-01

    "Monitoring multi-party contracts for E-business" investigates the issues involved in the performance of econtract monitoring of business automations in business to business e-commerce environment. A pro-active monitoring contract model and monitoring mechanism have been designed and developed. A

  6. Framing labor contracts : Contract versus network theories

    NARCIS (Netherlands)

    Knegt, R.

    2016-01-01

    Since the 18th century the ‘contractual model’ has become both a paradigm of social theories (f.i. ‘rational choice’) and a dominant model of structuring labour relations. Its presupposition of the subjectivity of individual actors as a given is criticized with reference to network-based theories

  7. 48 CFR 1316.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1316.406 Section 1316.406 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1316.406 Contract clauses. Insert a clause...

  8. 48 CFR 716.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  9. 48 CFR 916.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.307 Section 916.307 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.307 Contract clauses. (g) Insert the...

  10. 48 CFR 732.111 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111... CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may... Agency-specific indefinite quantity contracts that are a combination of contract types. Rather than using...

  11. 48 CFR 935.071 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 935.071... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.071 Contract clause. The contracting officer must insert the clause at 952.235-71, Research Misconduct, in contracts, including management and operating...

  12. Bouncing back from psychological contract breach: How commitment recovers over time

    NARCIS (Netherlands)

    Solinger, O.N.; Hofmans, J.; Bal, P.M.; Jansen, P.G.W.

    2016-01-01

    The post-violation model of the psychological contract outlines four ways in which a psychological contract may be resolved after breach (i.e., psychological contract thriving, reactivation, impairment, and dissolution). To explore the implications of this model for post-breach restoration of

  13. Contemporary psychological contracts : How both employer and employee are changing the employment relationship

    NARCIS (Netherlands)

    van der Smissen, A.I.M.; Schalk, R.; Freese, C.

    2013-01-01

    The employment relationship between employer and employee has gone through fundamental changes in the last decades, influencing psychological contracts. It is unclear, however, exactly how psychological contracts are changing. This article offers a comprehensive model that focuses on two factors

  14. The effects of hospitals' governance on optimal contracts: bargaining vs. contracting.

    Science.gov (United States)

    Galizzi, Matteo M; Miraldo, Marisa

    2011-03-01

    We propose a two-stage model to study the impact of different hospitals' governance frameworks on the optimal contracts designed by third-party payers when patients' disease severity is the private information of the hospital. In the second stage, doctors and managers interact within either a bargaining or a contracting scenario. In the contracting scenario, managers offer a contract that determines the payment to doctors, and doctors decide how many patients to treat. In the bargaining scenario, doctors and managers strategically negotiate on both the payment to doctors and the number of patients to treat. We derive the equilibrium doctors' payments and number of treated patients under both scenarios. We then derive the optimal contract offered by the government to the hospital in the first stage. Results show that when the cost of capital is sufficiently low, the informational rent is lower, and the social welfare is higher, in the contracting scenario. Copyright © 2010 Elsevier B.V. All rights reserved.

  15. Corrective justice and contract law

    Directory of Open Access Journals (Sweden)

    Martín Hevia

    2010-06-01

    Full Text Available This article suggests that the central aspects of contract law in various jurisdictions can be explained within the idea of corrective justice. The article is divided into three parts. The first part distinguishes between corrective justice and distributive justice. The second part describes contract law. The third part focuses on actions for breach of contract and within that context reflects upon the idea of corrective justice.

  16. Incentive contracts and time use

    OpenAIRE

    Tor Viking Eriksson; Jaime Ortega

    2011-01-01

    Empirical studies on incentive contracts have primarily been concerned with the effects on employees’ productivity and earnings. The productivity increases associated with such contracts may, however, come at the expense of quality of life at or outside work. In this paper we study the effect on the employees’ non-work activities, testing whether incentive contracts lead to a change in the allocation of time across work and non-work activities. In doing so, we distinguish between two effects,...

  17. Methodological remarks on contraction theory

    DEFF Research Database (Denmark)

    Jouffroy, Jerome; Slotine, Jean-Jacques E.

    Because contraction analysis stems from a differential and incremental framework, the nature and methodology of contraction-based proofs are significantly different from those of their Lyapunov-based counterparts. This paper specifically studies this issue, and illustrates it by revisiting some c...... classical examples traditionally addressed using Lyapunov theory. Even in these cases, contraction tools can often yield significantly simplified analysis. The examples include adaptive control, robotics, and a proof of convergence of the deterministic Extended Kalman Filter....

  18. Judges, commerce and contract law

    OpenAIRE

    Gava, John

    2010-01-01

    John Gava, Reader at Adelaide Law School, considers the question how should judges decide commercial cases, in particular, contract cases? He looks at the circumstances and impact of the use of contract law, with attention on common law contract and market needs. Published in Amicus Curiae – Journal of the Society for Advanced Legal Studies at the Institute of Advanced Legal Studies. The Journal is produced by SALS at the IALS (Institute of Advanced Legal Studies, School of Advanced Study, Un...

  19. On Permuting Cut with Contraction

    OpenAIRE

    Borisavljevic, Mirjana; Dosen, Kosta; Petric, Zoran

    1999-01-01

    The paper presents a cut-elimination procedure for intuitionistic propositional logic in which cut is eliminated directly, without introducing the multiple-cut rule mix, and in which pushing cut above contraction is one of the reduction steps. The presentation of this procedure is preceded by an analysis of Gentzen's mix-elimination procedure, made in the perspective of permuting cut with contraction. It is also shown that in the absence of implication, pushing cut above contraction doesn't p...

  20. Corrective justice and contract law

    OpenAIRE

    Martín Hevia

    2010-01-01

    This article suggests that the central aspects of contract law in various jurisdictions can be explained within the idea of corrective justice. The article is divided into three parts. The first part distinguishes between corrective justice and distributive justice. The second part describes contract law. The third part focuses on actions for breach of contract and within that context reflects upon the idea of corrective justice.

  1. "Exclusive Dealing Contract and Inefficient Entry Threat"

    OpenAIRE

    Noriyuki Yanagawa; Ryoko Oki

    2008-01-01

    This paper examines the effects of exclusive dealing contracts in a simple model with manufacturers-distributors relations. We consider entrants in both manufacturing and distribution sectors. It is well-known that a potential entry threat is welfare increasing under homogenous price competition, even though the potential entrant is less productive. This paper reexamines this intuition by employing the above model. We show that the entry threat of a less-productive manufacturer is welfare dec...

  2. Modelos de previsão de preços aplicados aos contratos futuros de boi gordo na BM&F Models of price forecasting applied to futures contracts of live cattle at the Brazilian Futures Market - BM&F

    Directory of Open Access Journals (Sweden)

    Aureliano Angel Bressan

    2002-01-01

    Full Text Available This paper studies the applicability of time series models as a decision tool of buy and sell orders of live cattle futures contracts in the Brazilian Futures Market (BM&F, on dates close to expiration. The models considered are: ARIMA, Neural Networks and Dynamic Linear Models - DLM (this in the classic and bayesian approach. Weekly data, of the spot and futures markets, from 1996 to 1999, are used to calculate the forecasts. The main purpose is to calculate the returns, in buy/sell orders of live cattle futures between 1998 and 1999, in order to show the potentials or limitations of each model. The results show positive returns in almost all contracts analyzed, indicating the potential of the models as a decision tool in operating with futures contracts close to expiration date, with distinction on the performance of the Classic DLM and ARIMA models, although some differences in forecasting accuracy.

  3. Forthcoming indefinite contract review procedure

    CERN Multimedia

    Human Resources Department

    2011-01-01

    The vacancy notices for posts opened with a view to the award of an indefinite contract will be published in early April 2011. In the meantime, the list of posts to be opened this spring is available at the following address: Indefinite contract posts - spring 2011 A second exercise will take place in autumn 2011 and, as of 2012, the indefinite contract award procedure will only be held once a year, in autumn. For more information please consult: https://hr-recruit.web.cern.ch/hr-recruit/staff/IndefiniteContracts.asp  

  4. Work and minor work contracts

    CERN Document Server

    1999-01-01

    The Work and Minor Work contracts are all of the result-oriented type. The work is specified by CERN and the contractor is given full responsibility for its performance. The contracts are thus very similar to supply contracts. The re-tendering of the existing contracts is almost complete, except for some building maintenance contracts. A new cycle of re-tendering for some activities will be launched in the next twelve months. The total estimated expenditure in the year 2000 for the contracts referred to in this document is 27 750 000 Swiss francs at 1999 prices. The Finance Committee is invited: - to approve the proposed expenditure for the extension of contracts for which the estimated amount for the year 2000 exceeds 750 000 Swiss francs, namely those under references 1, 2, 3, 5, 7, 8, 9 and 23, highlighted in Table I; - to take note that all Work and Minor Work contracts have been tendered since 1 January 1994, except the small contracts shown under references 12 and 16 in Table I; - to take note that the ...

  5. URGENSI STUDI TENTANG PROCUREMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Yohanes Sogar Simamora

    2006-01-01

    Full Text Available Contractualization is kind of goverment activity in acquiring goods, services and infrastructure as well. Procurement contract has several important function especially in enhancing economic development in a state. In Indonesia, this kind of contract also has function in empowering micro economic scale. Since the aim of procurement study is to provide equal protection between public fund interest in one hand and privat sector in the other hand, general principle of contract law must be taken into consideration together with transparency as the most important principle in government contract.

  6. Population-based contracting (population health): part II.

    Science.gov (United States)

    Jacofsky, D J

    2017-11-01

    Modern healthcare contracting is shifting the responsibility for improving quality, enhancing community health and controlling the total cost of care for patient populations from payers to providers. Population-based contracting involves capitated risk taken across an entire population, such that any included services within the contract are paid for by the risk-bearing entity throughout the term of the agreement. Under such contracts, a risk-bearing entity, which may be a provider group, a hospital or another payer, administers the contract and assumes risk for contractually defined services. These contracts can be structured in various ways, from professional fee capitation to full global per member per month diagnosis-based risk. The entity contracting with the payer must have downstream network contracts to provide the care and facilities that it has agreed to provide. Population health is a very powerful model to reduce waste and costs. It requires a deep understanding of the nuances of such contracting and the appropriate infrastructure to manage both networks and risk. Cite this article: Bone Joint J 2017;99-B:1431-4. ©2017 The British Editorial Society of Bone & Joint Surgery.

  7. Contracts Take or Pay, for supply and transport of gas

    International Nuclear Information System (INIS)

    Velasquez Bermudez, Jesus Maria

    2000-01-01

    The present article has as objective to study the effect that has the contract of supply and of transport of gas that subscribe generators agents of the electric sector with the agents of the market of the gas. The article concentrates on the study of the denominated contracts take or pay. Initially the modeling is analyzed to include the effect of the contracts of gas in the mathematical models that are used to support the works of planning. Later on is studied of optimal form to determining the prices in spot markets of the industries associated to the contracts. Finally is presented the methodology and controlled experiments that allow to identify and to quantify the macro economic effect of the contracts

  8. Features of the content of corporate contracts

    Directory of Open Access Journals (Sweden)

    Elena Petrovna Gladneva

    2015-09-01

    Full Text Available Objective to study the legal nature to reveal the peculiarities of the subject and other essential terms of corporate contracts as a technique and means of legal regulation of corporate relations. Methods general and specific methods of cognition dialectical formal logic analysis synthesis modeling structural and systemicfunctional methods as well as comparative legal logical legal historical legal grammatical methods and systemic interpretation. Results it is concluded that the object of corporate contracts includes terms about the features of implementation of corporate rights for shares and share in capital assets conditions order of the implementation of corporate rights and approval of other actions related to company management activity reorganization and liquidation the passive duty of corporate organizations to refrain from committing any action authority arising from the nature of corporate agreements as well as the active responsibilities associated with the certain implementation of corporate rights certified by stocks shares rights to stocks shares. In addition to the subject the content of corporate contractsincludes other essential necessary conditions stipulated by the corporate legislation norms and the agreement of the participants of economic entity. Scientific novelty for the first time taking into account modern achievements of civilistic jurisprudence and practice the authors investigate the relationship between the concepts of a civil contract and corporate contract give the definition of corporate contract show the specificity of the subject and other material terms of corporate contracts. Practical significance the findings can be taken into account in the further research of corporate law issues as subbranch of civil law used in law making and enforcement activities in the educational process as a teaching material in civil law. nbsp

  9. Essays on incomplete contracts in regulatory activities

    Science.gov (United States)

    Saavedra, Eduardo Humberto

    This dissertation consists of three essays. The first essay, The Hold-Up Problem in Public Infrastructure Franchising, characterizes the equilibria of the investment decisions in public infrastructure franchising under incomplete contracting and ex-post renegotiation. The parties (government and a firm) are unable to credibly commit to the contracted investment plan, so that a second step investment is renegotiated by the parties at the revision stage. As expected, the possibility of renegotiation affects initial non-verifiable investments. The main conclusion of this essay is that not only underinvestment but also overinvestment in infrastructure may arise in equilibrium, compared to the complete contracting case. The second essay, Alternative Institutional Arrangements in Network Utilities: An Incomplete Contracting Approach, presents a theoretical assessment of the efficiency implications of privatizing natural monopolies which are vertically related to potential competitive firms. Based on the incomplete contracts and asymmetric information paradigm. I develop a model that analyzes the relative advantages of different institutional arrangements---alternative ownership and market structures in the industry--- in terms of their allocative and productive efficiencies. The main policy conclusion of this essay is that both ownership and the existence of conglomerates in network industries matter. Among other conclusions, this essay provides an economic rationale for a mixed economy in which the network is public and vertical separation of the industry when the natural monopoly is under private ownership. The last essay, Opportunistic Behavior and Legal Disputes in the Chilean Electricity Sector, analyzes post-contractual disputes in this newly privatized industry. It discusses the presumption that opportunistic behavior and disputes arise due to inadequate market design, ambiguous regulation, and institutional weaknesses. This chapter also assesses the presumption

  10. Unfair contract terms in B2C contracts

    NARCIS (Netherlands)

    Hesselink, M.W.; Loos, M.B.M.

    2012-01-01

    Because of its textual similarity to the Unfair Terms Directive 1993, Chapter 8 of the proposed CESL, on ‘Unfair contract terms’, can benefit from two decades of interpretative experience which is likely to provide a comparably high degree of instant legal certainty to contracting parties.

  11. Muscle contraction increases carnitine uptake via translocation of OCTN2

    International Nuclear Information System (INIS)

    Furuichi, Yasuro; Sugiura, Tomoko; Kato, Yukio; Takakura, Hisashi; Hanai, Yoshiteru; Hashimoto, Takeshi; Masuda, Kazumi

    2012-01-01

    Highlights: ► Muscle contraction augmented carnitine uptake into rat hindlimb muscles. ► An increase in carnitine uptake was due to an intrinsic clearance, not blood flow. ► Histochemical analysis showed sarcolemmal OCTN2 was emphasized after contraction. ► OCTN2 protein in sarcolemmal fraction was increased in contracting muscles. -- Abstract: Since carnitine plays an important role in fat oxidation, influx of carnitine could be crucial for muscle metabolism. OCTN2 (SLC22A5), a sodium-dependent solute carrier, is assumed to transport carnitine into skeletal muscle cells. Acute regulation of OCTN2 activity in rat hindlimb muscles was investigated in response to electrically induced contractile activity. The tissue uptake clearance (CL uptake ) of L-[ 3 H]carnitine during muscle contraction was examined in vivo using integration plot analysis. The CL uptake of [ 14 C]iodoantipyrine (IAP) was also determined as an index of tissue blood flow. To test the hypothesis that increased carnitine uptake involves the translocation of OCTN2, contraction-induced alteration in the subcellular localization of OCTN2 was examined. The CL uptake of L-[ 3 H]carnitine in the contracting muscles increased 1.4–1.7-fold as compared to that in the contralateral resting muscles (p uptake of [ 14 C]IAP was much higher than that of L-[ 3 H]carnitine, but no association between the increase in carnitine uptake and blood flow was obtained. Co-immunostaining of OCTN2 and dystrophin (a muscle plasma membrane marker) showed an increase in OCTN2 signal in the plasma membrane after muscle contraction. Western blotting showed that the level of sarcolemmal OCTN2 was greater in contracting muscles than in resting muscles (p < 0.05). The present study showed that muscle contraction facilitated carnitine uptake in skeletal muscles, possibly via the contraction-induced translocation of its specific transporter OCTN2 to the plasma membrane.

  12. The Relationship between the Employment Contract and other Civil Contracts

    Directory of Open Access Journals (Sweden)

    Răzvan Radu Popescu

    2015-05-01

    Full Text Available The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is unlike most other contracts. Although the parties will have negotiated the main terms, we shall see that a large number of terms will be implied into the agreement from all sorts of different sources and will not have been individually negotiated by the parties at all. This is what makes an employment contract so different from other contracts. We think this article is an important step in the disclosure of the problem eraised by these two concepts.

  13. Treatment with anti-C5aR mAb leads to early-onset clinical and mechanistic effects in the murine delayed-type hypersensitivity arthritis model

    DEFF Research Database (Denmark)

    Atkinson, Sara Marie; Nansen, Anneline; Usher, Pernille A.

    2015-01-01

    Blockade of the complement cascade at the C5a/C5a receptor (C5aR)-axis is believed to be an attractive treatment avenue in rheumatoid arthritis (RA). However, the effects of such interventions during the early phases of arthritis remain to be clarified. In this study we use the murine delayed-typ...

  14. Analysis of Government Accountability Office and Department of Defense Inspector General Reports and Commercial Sources on Service Contracts

    Science.gov (United States)

    2010-06-01

    Acquisition Research Program BIM Building Information Modeling COR Contracting Officer Representative DoD Department of Defense FPDS...WBS), performance work statements (PWS) and statement of work (SOW), market research, budget and cost estimates, determining contract type, and...contracting within this project. The recurrent best practices in contracting among all sources emphasized planning, defining requirements, market research

  15. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.; Vertragshandbuch Stromwirtschaft. Praxisgerechte Gestaltung und rechtssichere Anwendung

    Energy Technology Data Exchange (ETDEWEB)

    Schoene, Thomas (ed.)

    2014-07-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  16. Reply to Comment by W. R. Peltier, D. F. Argus, and R. Drummond on "An Assessment of the ICE6G_C (VM5a) Glacial Isostatic Adjustment Model"

    Science.gov (United States)

    Purcell, A.; Tregoning, P.; Dehecq, A.

    2018-02-01

    The empirical approximation of Purcell et al. (2011, https://doi.org/10.1029/2011GL048624) has been validated by Peltier et al. (2018, https://doi.org/10.1002/2016JB013844). In their Comment they introduced new results derived from the same ice/rheology models of ICE6G_C (VM5a) but using a different model for Antarctic bathymetry. This has greatly reduced the differences in predicted Antarctic uplift rates relative to those of Purcell et al. (2016, https://doi.org/10.1002/2015JB012742). In fact, with a ˜50% reduction in uplift rate in the Weddell Sea, the results of Peltier et al. (2018, https://doi.org/10.1002/2016JB013844) now agree more closely with the predictions of Purcell et al. (2016, https://doi.org/10.1002/2015JB012742) than with the original ICE6G_C values. Peltier et al. (2018, https://doi.org/10.1002/2016JB013844) state that the high power in their high-frequency spherical harmonic coefficients remains in their new calculations. They also claim that Purcell et al. (2016, https://doi.org/10.1002/2015JB012742) used an inaccurate loading history in deriving their velocity field. In fact, the ice load history was unchanged; to remove any ambiguity, the ice and water load histories used in the CALSEA calculations are provided in the supporting information.

  17. Pressure drop in contraction flow

    DEFF Research Database (Denmark)

    Rasmussen, Henrik Koblitz

    This note is a supplement to Dynamic of Polymeric Liquids (DPL) page 178. DPL gives an equation for the pressure drop in a tapered (and circular) contraction, valid only at low angles. Here the general definition of contraction flow (the Bagley correction) and a more general method to find...

  18. Contract Mining versus Owner Mining

    African Journals Online (AJOL)

    Owner

    mining companies can concentrate on their core businesses while using specialists for ... 2 Definition of Contract and Owner. Mining ... equipment maintenance, scheduling and budgeting ..... No. Region. Amount Spent on. Contract Mining. ($ billion). Percent of. Total. 1 ... cost and productivity data based on a large range.

  19. Army Contract Writing System (ACWS)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Army Contract Writing System (ACWS) Defense Acquisition Management Information Retrieval...Information 4 Responsible Office 4 References 4 Program Description 5 Business Case 5 Program Status 6 Schedule 7 Performance...Program Information Program Name Army Contract Writing System (ACWS) DoD Component Army Responsible Office Program Manager References MAIS

  20. CONTRACT ADMINISTRATIVE TRACKING SYSTEM (CATS)

    Science.gov (United States)

    The Contract Administrative Tracking System (CATS) was developed in response to an ORD NHEERL, Mid-Continent Ecology Division (MED)-recognized need for an automated tracking and retrieval system for Cost Reimbursable Level of Effort (CR/LOE) Contracts. CATS is an Oracle-based app...

  1. On CNC Commuting Contractive Tuples

    Indian Academy of Sciences (India)

    The characteristic function has been an important tool for studying completely non-unitary contractions on Hilbert spaces. In this note, we consider completely non-coisometric contractive tuples of commuting operators on a Hilbert space H . We show that the characteristic function, which is now an operator-valued analytic ...

  2. Alternative staffing services. Contract transcription.

    Science.gov (United States)

    Tessier, C

    1992-03-01

    Contract medical transcription services can be of great assistance in meeting the demands for transcription, without jeopardizing patient, physician, or institutional confidentiality. You simply must require the contract service to provide at least the same degree of protection and preservation of confidentiality that you should require inhouse. To achieve this you must make these requirements explicit, comprehensive, comprehensible, believable, and enforceable. Discuss the requirements with prospective contractors. Review them at least annually with existing contractors and when contracts are due for renewal. Be sure to specify the consequence of breaching confidentiality, and if there are breaches, enforce the terms of the contract. Consult your institution's legal counsel both in developing the contract and in enforcing its provisions. Take into consideration your department's and institution's policies, AHIMA's statement on confidentiality, as well as local, state, and federal laws. Above all, never lose sight of the patient. Ultimately, it is not patient information that you are obligated to protect. It is the patient.

  3. Exploring the Psychological Contract of the Canadian Forces

    National Research Council Canada - National Science Library

    Nordick, Glenn

    1999-01-01

    .... The models of culture and expectation have then been used to examine possible areas of contract breach. Finally, recommendations are made on how to solidify the relationship between the CF and its members.

  4. Standard form contracts and a smart contract future

    Directory of Open Access Journals (Sweden)

    Kristin B. Cornelius

    2018-05-01

    Full Text Available With a budding market of widespread smart contract implementation on the horizon, there is much conversation about how to regulate this new technology. Discourse on standard form contracts (SFCs and how they have been adopted in a digital environment is useful toward predicting how smart contracts might be interpreted. This essay provides a critical review of the discourse surrounding digitised SFCs and applies it to issues in smart contract regulation. An exploration of the literature surrounding specific instances SFCs finds that it lacks a close examination of the textual and documentary aspects of SFCs, which are particularly important in a digital environment as a shift in medium prompts a different procedural process. Instead, common perspectives are either based on outdated notions of paper versions of these contracts or on ideologies of industry and business that do not sufficiently address the needs of consumers/users in the digital age. Most importantly, noting the failure of contract law to address the inequities of SFCs in this environment can help prevent them from being codified further with smart contracts.

  5. [Ulysses contract in psychiatry].

    Science.gov (United States)

    Daverio, Andrea; Piazzi, Gioia; Saya, Anna

    2017-01-01

    Over the last twenty years we have witnessed a growing focus on the rights of the ill people. The debate on informed consent and a new redefinition of the therapeutic relationship is constantly evolving. With this article, we propose a critical literature review of the so-called "Ulysses contract" or "psychiatric advance directives". It refers to the will that a subject expresses in writing, or orally, about the treatments he or she wishes or does not wish to be subject to if the time comes when it may be impossible to express his/her consent. This can especially occur in those with psychiatric disorders with serious clinical involvement and remitting-relapse (typically bipolar disorder, but also chronic delusional disorders and schizophrenia). In this context, the question is whether during intercritical periods the patient may or may not leave instructions to their care-givers. This aspect opens up to a series of interdisciplinary problems. In this article, we want to show the complexity of this debate from a clinical, ethical, legal and psychodynamic point of view, emphasizing the strengths and the major criticisms of the psychiatric advance directives for each area.

  6. Landsat 6 contract signed

    Science.gov (United States)

    Maggs, William Ward

    A new agreement provides $220 million for development and construction of the Landsat 6 remote sensing satellite and its ground systems. The contract, signed on March 31, 1988, by the Department of Commerce (DOC) and the Earth Observation Satellite (EOSAT) Company of Lanham, Md., came just days after approval of DOC's Landsat commercialization plan by subcommittees of the House and Senate appropriations committees.The Landsat 6 spacecraft is due to be launched into orbit on a Titan II rocket in June 1991 from Vandenburg Air Force Base, Calif. The satellite will carry an Enhanced Thematic Mapper (ETM) sensor, an instrument sensitive to electromagnetic radiation in seven ranges or bands of wavelengths. The satellite's payload will also include the Sea Wide Field Sensor (Sea-WiFS), designed to provide information on sea surface temperature and ocean color. The sensor is being developed in a cooperative effort by EOSAT and the National Aeronautics and Space Administration (NASA). A less certain passenger is a proposed 5-m resolution, three-band sensor sensitive to visible light. EOSAT is trying to find both private financing for the device and potential buyers of the high-resolution imagery that it could produce. The company has been actively courting U.S. television networks, which have in the past used imagery from the European Système Probatoire d'Observation de la Terre (SPOT) satellite for news coverage.

  7. INFINITY construction contract signed

    Science.gov (United States)

    2010-01-01

    Key state and community leaders celebrated April 6 with the signing of a construction contract for the state-of-the-art INFINITY Science Center planned near John C. Stennis Space Center in south Mississippi. Gulfport Mayor George Schloegel (l to r), chair of non-profit INFINITY Science Center Inc., was joined for the signing ceremony at the Hancock Bank in Gulfport by Virginia Wagner, sister of late Hancock Bank President Leo Seal Jr.; and Roy Anderson III, president and CEO of Roy Anderson Corp. Seal was the first chair of INFINITY Science Center Inc., which has led in development of the project. Roy Anderson Corp. plans to begin construction on the 72,000-square-foot, $28 million science and education center in May. The Mississippi Department of Transportation (MDOT) also is set to begin construction of a $2 million access road to the new center. The April 6 ceremony was attended by numerous officials, including former Stennis Space Center Directors Jerry Hlass and Roy Estess; Mississippi Senate President Pro Tempore Billy Hewes, R-Gulfport; Mississippi Rep. Diane Peranich, D-Pass Christian; and MDOT Southern District Commissioner Wayne Brown.

  8. Successive duopoly under moral hazard: Will incentive contracts persist?

    Directory of Open Access Journals (Sweden)

    Marta Fernández-Olmos

    2009-07-01

    Full Text Available The central purpose of this paper is to examine the incentive contract as an equilibrium phenomenon. We analyse a model of vertical differentiation in which we deal with the strategic role of the competitor’s decisions in a successive duopoly. Is it better for a processor to offer an incentive contract to an upstream producer or the spot market? We determine the equilibrium of a game in which the processors simultaneously decide whether to offer an incentive contract or to continue at the spot market to acquire their input. Our results show that under successive duopoly, offering an incentive contract constitutes the unique equilibrium solution, which highlights the incentive contract persistence.

  9. 7 CFR 631.14 - Contract violations.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Contracts § 631.14 Contract violations. Contract violations, determinations and appeals will be handled in accordance with the terms of the... 7 Agriculture 6 2010-01-01 2010-01-01 false Contract violations. 631.14 Section 631.14 Agriculture...

  10. 48 CFR 46.314 - Transportation contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  11. 24 CFR 891.560 - HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  12. 77 FR 3288 - International Mail Contract

    Science.gov (United States)

    2012-01-23

    ... as the baseline contract for future functional equivalence analyses of the GREP Contracts 1 product... Classification Schedule language for GREP Contracts 1. The Postal Service identifies general contract terms that... methodology, the relevant characteristics of this GREP contract are similar, if not the same, as the relevant...

  13. 77 FR 71458 - New International Mail Contract

    Science.gov (United States)

    2012-11-30

    ... Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a... Contracts 1. This document invites public comments on the request and addresses several related procedural... Reseller Expedited Package (GREP) contract (Contracts 1).\\1\\ It seeks to have the instant Contract included...

  14. 48 CFR 926.7104 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 926.7104... 1993. 926.7104 Contract clause. The contracting officer shall insert the clause at 48 CFR (DEAR) 952.226-74, Displaced Employee Hiring Preference, in contracts (except for contracts for commercial items...

  15. 48 CFR 837.403 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 837.403... OF CONTRACTING SERVICE CONTRACTING Nonpersonal Health Care Services 837.403 Contract clause. The contracting officer shall insert the clause at 852.237-7, Indemnification and medical liability insurance, in...

  16. 48 CFR 822.305 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 822.305... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety Standards Act 822.305 Contract clause. The contracting officer shall insert the clause at 852.222-70, Contract Work...

  17. 48 CFR 811.503 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.503... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Liquidated Damages 811.503 Contract clause. When the contracting... contracting officer must include the clause in 852.211-74, Liquidated damages, in the contract. ...

  18. Ontologies for commitment-based smart contracts

    NARCIS (Netherlands)

    de Kruijff, Joost; Weigand, Hans; Panetto, H; Debruyne, C.; Gaaloul, W.; Papazoglou, M.; Paschke, A.; Ardagna, C.A.; Meersman, R.

    2017-01-01

    Smart contracts gain rapid exposure since the inception of blockchain technology. Yet there is no unified ontology for smart contracts. Being categorized as coded contracts or substitutes of conventional legal contracts, there is a need to reduce the conceptual ambiguity of smart contracts. We

  19. The ex post use of formal contracts in high-tech alliances. A contingency perspective

    NARCIS (Netherlands)

    Jong, G. de; Klein Woolthuis, R.J.A.

    2010-01-01

    In this study we investigate key contingencies that determine the active use of a formal contract after the strategic alliance has started. The antecedents for this ex post contract use address the contracting process, the need to safeguard spill-over risks and the existence of trust. The model is

  20. The psychological contracts of National Health Service nurses.

    Science.gov (United States)

    Purvis, Lynne J; Cropley, Mark

    2003-03-01

    Following the psychological contract model of the employee-employer exchange relationship is offered as a means of understanding the expectations of a UK sample of 223 National Health Service (NHS) nurses in association with their leaving intentions. A pilot study involving 21 NHS nurses, using the repertory grid technique was conducted to elicit contract expectations. Twenty-nine categories of expectation were identified through content analysis. The study proper, employed a survey developed on the basis of results from the pilot study to identify contract profiles among 223 nurses from three London/South-east NHS hospitals, using the Q-sort method. Type of contract held (relational/transactional), satisfaction (job and organization), and leaving intentions were also examined. Q-analysis yielded four contract profiles among the nurses sampled: 'self-development and achievement'; 'belonging and development'; 'competence and collegiality' and 'autonomy and development'. Correlation analysis demonstrated that leaving intentions were associated with a need for personal autonomy and development, and the violation of expectations for being appreciated, valued, recognized and rewarded for effort, loyalty, hard-work and achievement, negative endorsement of a relational contract, positive endorsement of a transactional contract, and job and organizational dissatisfaction. Findings illustrate the diagnostic utility of the term psychological contract for understanding the expectations of NHS nurses. The potential significance of these findings for managing nurse retention is highlighted.

  1. Creating smart contracts using blockchain technology

    OpenAIRE

    Baronas, Erikas

    2018-01-01

    This paper presents Blockchain, crypto-currencie’s core technology analysis and smart cont- racts potentialities research. Bringing up two frameworks - Ethereum and Bitcoin - helps to un- derstand the principles of how decentralized system work and what solutions ensure data integrity and immutability in both technologies. The main goal of this work - prove, that smart contracts can be used in real world system model. Paper egzamines prototypes, which increase exponentially by their complexit...

  2. Negotiations and Exclusivity Contracts for Advertising

    OpenAIRE

    Anthony Dukes; Esther Gal–Or

    2003-01-01

    Exclusive advertising on a given media outlet is usually profitable for an advertiser because consumers are less aware of competing products. However, for such arrangements to exist, media must benefit as well. We examine conditions under which such exclusive advertising contracts benefit both advertisers and media outlets (referred to as ) by illustrating that exclusive equilibria arise in a theoretical model of the media, advertisers, and consumers who participate in both the product and me...

  3. Options contracts in the nuclear fuel industry

    International Nuclear Information System (INIS)

    Fuller, D.M.

    1995-01-01

    This article discusses options trading in the nuclear fuels industry. Although there now exists no formal options market in the nuclear industry, flexibilities, or embedded options, are actually quite common in the long-term supply contracts. The value of these flexibilities can be estimated by applying the methods used to evaluate options. The method used is the Black-Scholes Model, and it is applied to a number of examples

  4. Long Dated Life Insurance and Pension Contracts

    OpenAIRE

    Aase, Knut K.

    2011-01-01

    We discuss the "life cycle model" by first introducing a credit market with only biometric risk, and then market risk is introduced via risky securities. This framework enables us to find optimal pension plans and life insurance contracts where the benefits are state dependent. We compare these solutions both to the ones of standard actuarial theory, and to policies offered in practice. Two related portfolio choice puzzles are discussed in the light of recent research, one is the horizon prob...

  5. Food and drink serving contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2012-01-01

    Full Text Available Food and drink catering service is almost as old as the civilization itself. Even though this vocation is a part of the catering activity, Serbian law does not foresee this contract section as personalized. Key legal sources for this kind of contract are business customs. Food and drink serving contract is a mixed-type contract and its legal nature is very interesting due to its complexity. Specific for this contract is the fact that it is not an ordinary service, but also an activity which requires a degree of culinary skills, knowledge of customs of other nations, as well as other skills. The very category of a good professional in business economy / hospitality industry is very dynamic, as it needs to be evaluated according to all given circumstances, which may be rather unpredictable. By considering the legal nature, but also the rights and obligations of the contracting parties, we tried to point to the questions that require a special attention. Legal sources that indirectly refer to food and drink serving contracts were taken into account. Apart from the Law on Obligatory Relations, we also considered here the Law on Tourism also pointing to the comparative law and jurisprudence.

  6. nth roots of normal contractions

    International Nuclear Information System (INIS)

    Duggal, B.P.

    1992-07-01

    Given a complex separable Hilbert space H and a contraction A on H such that A n , n≥2 some integer, is normal it is shown that if the defect operator D A = (1 - A * A) 1/2 is of the Hilbert-Schmidt class, then A is similar to a normal contraction, either A or A 2 is normal, and if A 2 is normal (but A is not) then there is a normal contraction N and a positive definite contraction P of trace class such that parallel to A - N parallel to 1 = 1/2 parallel to P + P parallel to 1 (where parallel to · parallel to 1 denotes the trace norm). If T is a compact contraction such that its characteristics function admits a scalar factor, if T = A n for some integer n≥2 and contraction A with simple eigen-values, and if both T and A satisfy a ''reductive property'', then A is a compact normal contraction. (author). 16 refs

  7. Contraction ionization waves in the argon contracted discharge

    International Nuclear Information System (INIS)

    Golubovskij, Yu.B.; Kulikov, V.V.; Nekutchaev, V.O.

    1985-01-01

    An investigation of ionization waves in the argon contracted discharge and a definition of their arising propagation mechanism accounting for the specificity of elementary pocesses characteristic of argon are presented. (author)

  8. Defense Threat Reduction Agency > Contracts > Contract Award Data

    Science.gov (United States)

    Integration Command Senior Enlisted Leader Media News News Archive Strategic Plan Videos Mission Research Support Center Contact Us FAQ Sheet Links Success Stories Contracts Business Opportunities Current Justifications & Approvals Careers Who We Are Our Values Strategic Recruiting Programs Professional

  9. Examination of constitutive model for evaluating long-term behavior of buffer. Document prepared by other institute, based on the trust contract

    International Nuclear Information System (INIS)

    Shigeno, Yoshimasa; Namikawa, Tsutomu; Takaji, Kazuhiko

    2002-02-01

    On the R and D of the high-level radioactive waste repository, it is essential that Engineered Barrier System (EBS) is stable mechanically over a long period of time for maintaining ability required to EBS. After closing the repository, the external force is affected to buffer for a long period of time. So, it is necessary to make clear the mechanical deformation behavior of buffer to the external force, because of carrying out safety assessment of EBS accurately. In this report, the applicable constitutive model have been narrowed down from within many one for clay proposed up to the present, from the viewpoint of adoption possibility to the evaluation of the long-term mechanical behavior for buffer. To put it concretely, the investigation of constitutive models for clay, the applicability confirmation of the representative model by analysis using test data, and the proposal of experimental method available for simulation analysis is carried out. The results of the elemental test simulations using Adachi-Oka model and Sekiguchi-Ohta model as the representative model of ''Over stress model'' and Flow surface model'' are as follows. Both of the models are not make much difference. A limited part of the test results is expressed suitably according to the appropriate decision of viscous parameters, but the blanket behavior of each tests is not expressed suitably in either model. (author)

  10. Mitigating Provider Uncertainty in Service Provision Contracts

    Science.gov (United States)

    Smith, Chris; van Moorsel, Aad

    Uncertainty is an inherent property of open, distributed and multiparty systems. The viability of the mutually beneficial relationships which motivate these systems relies on rational decision-making by each constituent party under uncertainty. Service provision in distributed systems is one such relationship. Uncertainty is experienced by the service provider in his ability to deliver a service with selected quality level guarantees due to inherent non-determinism, such as load fluctuations and hardware failures. Statistical estimators utilized to model this non-determinism introduce additional uncertainty through sampling error. Inability of the provider to accurately model and analyze uncertainty in the quality level guarantees can result in the formation of sub-optimal service provision contracts. Emblematic consequences include loss of revenue, inefficient resource utilization and erosion of reputation and consumer trust. We propose a utility model for contract-based service provision to provide a systematic approach to optimal service provision contract formation under uncertainty. Performance prediction methods to enable the derivation of statistical estimators for quality level are introduced, with analysis of their resultant accuracy and cost.

  11. Contract portfolio optimization for a gasoline supply chain

    Science.gov (United States)

    Wang, Shanshan

    Major oil companies sell gasoline through three channels of trade: branded (associated with long-term contracts), unbranded (associated with short-term contracts), and spot market. The branded channel provides them with a long-term secured and sustainable demand source, but requires an inflexible long-term commitment with demand and price risks. The unbranded channel provides a medium level of allocation flexibility. The spot market provides them with the greatest allocation flexibility to the changing market conditions, but the spot market's illiquidity mitigates this benefit. In order to sell the product in a profitable and sustainable way, they need an optimal contract portfolio. This dissertation addresses the contract portfolio optimization problem from different perspectives (retrospective view and forward-looking view) at different levels (strategic level, tactical level and operational level). The objective of the retrospective operational model is to develop a financial case to estimate the business value of having a dynamic optimization model and quantify the opportunity values missed in the past. This model proves the financial significance of the problem and provides top management valuable insights into the business. BP has applied the insights and principles gained from this work and implemented the model to the entire Midwest gasoline supply chain to retrospectively review optimization opportunities. The strategic model is the most parsimonious model that captures the essential economic tradeoffs among different contract types, to demonstrate the need for a contract portfolio and what drives the portfolio. We examine the properties of the optimal contract portfolio and provide a comparative statics analysis by changing the model parameters. As the strategic model encapsulates the business problem at the macroscopic level, the tactical model resolves lower level issues. It considers the time dynamics, the information flow and contracting flow. Using

  12. The Relationship between the Employment Contract and other Civil Contracts

    OpenAIRE

    Răzvan Radu Popescu

    2015-01-01

    The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is...

  13. The North Sea contracting industry

    International Nuclear Information System (INIS)

    Wright, P.J.C.

    1996-09-01

    The North Sea Contracting Industry provides in-depth profiles of major contracting organisations including manpower, facilities, expertise, future directions and financial details. It addresses key issues such as: how will the role of operators and contractors change toward 2000 and beyond?; how will the contractor-operator relationship develop?; will the contractors take a more speculative role in projects such as leasing and contract to produce?; does the future belong to broad skilled providers or small specialised niche players, or both?; and how will rapid technological improvements affect the industry? (author)

  14. Pricing structures in US coal supply contracts

    Science.gov (United States)

    Kacker, Kanishka

    The subject of my dissertation is the study of coal procurement by electric utilities in the US over 2 decades, from 1979 to 2000. Energy markets are typically characterized by severe contracting problems. Buyers and sellers therefore employ various instruments, such as contract length or complex pricing arrangements, to restrict these problems. Relationship specific investment, wherein buyers make investments specific to their suppliers, has been advanced as a prominent explanation for contractual length. Investment decisions are however endogenous in length or pricing, making causal identification of the role of investment specificity difficult. In my first chapter, I attempt a resolution. I use the 1990 Clean Air Act Amendment as an exogenous shifter of the extent of relationship specific investment. A key feature of the Amendment's design helps me define a difference-in-difference model arguably free of the endogeneity issues discussed above. I find that the plants forced into switching - Phase I plants located in the US Midwest - are more likely to choose fixed price contracts than those that were not. Further they also write contracts of shorter terms, with the reduction being approximately 30%. Considerably little is known about the performance implications of contractual choices. These form the basis for Chapter 2. Here I find prices to be lower, by between 5% to 20% of the total transaction price, but the probability of renegotiation higher, under fixed price contracts than under escalator or cost-plus contracts. Contract choices appear consistent with a trade-off between establishing incentives ex-ante and lowering negotiation costs ex-post, with relationship specific investments in particular making such a trade-off compelling. Chapter 3 considers the regulatory environment these utilities were subject to. Both incentive based regulation as well as the restructuring of electricity generation are smaller in comparison to relationship specific investment

  15. 77 FR 76091 - International Mail Contract

    Science.gov (United States)

    2012-12-26

    ... an expired International Business Reply Service (IBRS) competitive contract.\\1\\ The Postal Service... International Business Reply Service Competitive Contract 1 Negotiated Service Agreement, December 14, 2012... history. The Commission added International Business Reply Service Contract 1 to the competitive product...

  16. 78 FR 11699 - International Mail Contract

    Science.gov (United States)

    2013-02-19

    ... additional International Business Reply Service (IBRS) Competitive Contract 3 negotiated service agreement... International Business Reply Service Competitive Contract 3 Negotiated Service Agreement, February 11, 2013.... 684, Order Approving International Business Reply Service Competitive Contract 3 Negotiated Service...

  17. 48 CFR 542.1107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Production Surveillance and Reporting 542.1107 Contract... clause may be used in indefinite-delivery definite-quantity contracts for Stock or Special Order Program...

  18. 42 CFR 422.504 - Contract provisions.

    Science.gov (United States)

    2010-10-01

    ...) MEDICARE PROGRAM MEDICARE ADVANTAGE PROGRAM Application Procedures and Contracts for Medicare Advantage... determinations of amounts payable under the contract. (iv) Properly reflect all direct and indirect costs claimed..., contracts, and subcontracts. (vi) Franchise, marketing, and management agreements. (vii) Schedules of...

  19. Bottomland Hardwood Planting: Example Contract Specifications

    National Research Council Canada - National Science Library

    Humprey, Monica

    2002-01-01

    This technical note provides an example of contract specifications that can be used as a template by USACE biologists, engineers, or contracting officers for contracting the planting of bottomland hardwood (BLH) seedlings...

  20. Utility Energy Services Contracts: Enabling Documents

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-05-01

    Utility Energy Services Contracts: Enabling Documents provides materials that clarify the authority for Federal agencies to enter into utility energy services contracts (UESCs), as well as sample documents and resources to ease utility partnership contracting.

  1. Effect of Transmural Differences in Excitation-Contraction Delay and Contraction Velocity on Left Ventricle Isovolumic Contraction: A Simulation Study

    Directory of Open Access Journals (Sweden)

    J. Vaverka

    2018-01-01

    Full Text Available Recent studies have shown that left ventricle (LV exhibits considerable transmural differences in active mechanical properties induced by transmural differences in electrical activity, excitation-contraction coupling, and contractile properties of individual myocytes. It was shown that the time between electrical and mechanical activation of myocytes (electromechanical delay: EMD decreases from subendocardium to subepicardium and, on the contrary, the myocyte shortening velocity (MSV increases in the same direction. To investigate the physiological importance of this inhomogeneity, we developed a new finite element model of LV incorporating the observed transmural gradients in EMD and MSV. Comparative simulations with the model showed that when EMD or MSV or both were set constant across the LV wall, the LV contractility during isovolumic contraction (IVC decreased significantly (dp/dtmax⁡  was reduced by 2 to 38% and IVC was prolonged by 18 to 73%. This was accompanied by an increase of transmural differences in wall stress. These results suggest that the transmural differences in EMD and MSV play an important role in physiological contractility of LV by synchronising the contraction of individual layers of ventricular wall during the systole. Reduction or enhancement of these differences may therefore impair the function of LV and contribute to heart failure.

  2. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  3. 23 CFR 635.121 - Contract time and contract time extensions.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  4. Price management mechanisms and the gas contract

    International Nuclear Information System (INIS)

    Dickson, D.J.

    1996-01-01

    Pricing objectives and risk management strategies that can be achieved through the proper use of the standard gas contract, were discussed. Main topics of discussion were: (1) gas sales contract and convertible pricing, (2) gas contract and imbedded hedging, gas contracts and exchange traded instruments, (4) gas contracts fixed for floating swaps, and OTC options and exotics, (5) options and exotic price structures, and (6) advantages and disadvantages of using the gas contract versus the swap agreement

  5. Principles of European Contract Law

    DEFF Research Database (Denmark)

    Lando, Ole; Beale, Hugh

    This text provides a comprehensive guide to the principles of European contract law. They have been drawn up by an independent body of experts from each Member State of the EU, under a project supported by the European Commission and many other organizations. The principles are stated in the form...... of articles, with a detailed commentary explaining the purpose and operation of each article and its relation to the remainder. Each article also has extensive comparative notes surveying the national laws and other international provisions on the topic. "The Principles of European Contract Law Parts I &...... in developing a common European legal culture. The European Parliament has twice called for the creation of a European Civil Code. The principles of European contract law are essential steps in these projects. This text provides a comprehensive guide to the Principles of European contract law. They have been...

  6. Framework for Structuring Procurement Contracts

    Directory of Open Access Journals (Sweden)

    Lena Borg

    2014-12-01

    Full Text Available The aim of this paper is to propose a new framework for structuring contract types and payment methods. Concerning procurement contracts, the first important new feature of this framework is a stepwise structure with three main steps in the contract design: (1 what will be procured—should the contract only include construction, or should it include both construction and operation/maintenance (2 who will do the detailed design of the premise and (3 how many contractors will the client use? The second important new feature of this framework is that both step 2 and step 3 include a continuum of alternatives. Concerning payment methods, the new framework is primarily based on how the specific risks of the project are shared. These frameworks can be useful for policy formulation in that they can help to avoid some problematic ways of formulating policies.

  7. Contracting and Performance in Agencies

    DEFF Research Database (Denmark)

    Bjørnholt, Bente; Houlberg Salomonsen, Heidi; Rennison, Betina Wolfgang

    As part of New Public Management (NPM), contracting represents a supplement to the traditional hierarchical and rule-based managing of relations between actors in order to improve performance (Fortin and van Hassel 2000; Greve and Ejersbo 2002; Drewry et al. 2005; Verhoest 2005). To various degrees...... higher goal attainment when agency head experience that the department balance dialogue and autonomy with some element of control in the process of internal contracting (Bjørnholt and Salomonsen 2011). This implies, that effective steering include a combination of decentralized management...... and how a balanced use of internal contracting leads to a better performance. These findings are then theoretically interpreted based upon a combination of literature on agencification as well as public management. We compare contracting across all Danish agencies based on a combination of survey...

  8. Contract Reform Self Assessment Report

    National Research Council Canada - National Science Library

    1997-01-01

    The primary objective of this self assessment is to report on the Department of Energy's progress in implementing the Contract Reform initiative launched in February 1994 and to discuss remaining challenges...

  9. Contraction of the solar nebula

    International Nuclear Information System (INIS)

    Rawal, J.J.

    1984-01-01

    The concept of Roche limit is applied to the Laplacian theory of the origin of the solar system to study the contraction of a spherical gas cloud (solar nebula). In the process of contraction of the solar nebula, it is assumed that the phenomenon of supersonic turbulent convection is operative and brings about the halt at various stages of contraction. It is found that the radius of the contracting solar nebula follows the Titius-Bode law. The consequences of the relation are also discussed. The aim is to attempt to explain, on the basis of the concept of Roche limit, the distribution of planets in the solar system and try to understand the physics underlying it. (Auth.)

  10. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  11. Multifamily Assistance Section 8 Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — he information regarding the Multifamily Assistance and Section 8 contracts, and properties is being furnished for the convenience of interested parties. The...

  12. Non-renewal of contracts

    CERN Multimedia

    Association du personnel

    2007-01-01

    A new illegal practice is appearing in certain sectors of the Organization: the non-renewal of renewable three-year limited-duration (LD) contracts, despite a more than satisfactory performance and an obvious commitment to the Organization.

  13. Next Indefinite Contract review exercise

    CERN Multimedia

    2013-01-01

    Dear Colleagues, We are pleased to inform you that the 2013 LD2IC exercise (selection process for the conversion of limited-duration contracts to indefinite contracts) was officially launched last week.  The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 9 August 2013 for a period of four weeks (until 8 September 2013). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: Information on the location of these sessions will be provided in due course on the CERN announcements page. HR Department

  14. Governance in Blockchain Technologies & Social Contract Theories

    Directory of Open Access Journals (Sweden)

    Wessel Reijers

    2016-12-01

    Full Text Available This paper is placed in the context of a growing number of social and political critiques of blockchain technologies. We focus on the supposed potential of blockchain technologies to transform political institutions that are central to contemporary human societies, such as money, property rights regimes, and systems of democratic governance. Our aim is to examine the way blockchain technologies canbring about - and justify - new models of governance. To do so, we draw on the philosophical works of Hobbes, Rousseau, and Rawls, analyzing blockchain governance in terms of contrasting social contract theories. We begin by comparing the justifications of blockchain governance offered by members of the blockchain developers’ community with the justifications of governance presented within social contract theories. We then examine the extent to which the model of governance offered by blockchain technologies reflects key governance themes and assumptions located within social contract theories, focusing on the notions of sovereignty, the initial situation, decentralization and distributive justice.

  15. The Goldilocks contract: The synergistic benefits of combining structure and autonomy for persistence, creativity, and cooperation.

    Science.gov (United States)

    Chou, Eileen Y; Halevy, Nir; Galinsky, Adam D; Murnighan, J Keith

    2017-09-01

    Contracts are commonly used to regulate a wide range of interactions and relationships. Yet relying on contracts as a mechanism of control often comes at a cost to motivation. Integrating theoretical perspectives from psychology, economics, and organizational theory, we explore this control-motivation dilemma inherent in contracts and present the Contract-Autonomy-Motivation-Performance-Structure (CAMPS) model, which highlights the synergistic benefits of combining structure and autonomy. The model proposes that subtle reductions in the specificity of a contract's language can boost autonomy, which increases intrinsic motivation and improves a range of desirable behaviors. Nine field and laboratory experiments found that less specific contracts increased task persistence, creativity, and cooperation, both immediately and longitudinally, because they boosted autonomy and intrinsic motivation. These positive effects, however, only occurred when contracts provided sufficient structure. Furthermore, the effects were limited to control-oriented clauses (i.e., legal clauses), and did not extend to coordination-oriented clauses (i.e., technical clauses). That is, there were synergistic benefits when a contract served as a scaffold that combined structure with general clauses. Overall, the current model and experiments identify a low-cost solution to the common problem of regulating social relationships: finding the right amount of contract specificity promotes desirable outcomes, including behaviors that are notoriously difficult to contract. The CAMPS model and the current set of empirical findings explain why, when, and how contracts can be used as an effective motivational tool. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  16. Examination of constitutive model for evaluating long-term mechanical behavior of buffer (II). Document prepared by other organization, based on the trust contract

    International Nuclear Information System (INIS)

    Shigeno, Yoshimasa; Namikawa, Tsutomu; Takaji, Kazuhiko

    2003-02-01

    On the R and D of the high-level radioactive waste repository, it is essential that Engineered Barrier System (EBS) is stable mechanically over a long period of time for maintaining each ability required to EBS. After closing the repository, the various external forces will be affected to buffer intricately for a long period of time. So, to make clear the mechanical deformation behavior of buffer against the external force is important, because of carrying out safety assessment of EBS accurately. In this report, reversal sets of parameters are chosen for the previously selected constitutive models, Sekiguchi-Ohta model and Adachi-Oka model and the element tests are simulated using these parameters. Through the simulation, applicability of the constitutive models and these parameters is examined. Using these parameters, sensitivity analysis of prototype EBS model is also done. Analysis is carried out with two cases. 1: Settlement of the over with no corrosion expansion. 2: Settlement of the over pack with corrosion expansion. The results of the analysis area as follows. Settlement by the weight is mainly affected by the viscous parameters. The whole destruction of the EBS does not occur with any set of applicable parameters. Viscous parameters are important to evaluate the effect of the over pack expansion on surrounding rocks. (author)

  17. Matrix metalloproteinase inhibition reduces contraction by dupuytren fibroblasts.

    Science.gov (United States)

    Townley, William A; Cambrey, Alison D; Khaw, Peng T; Grobbelaar, Adriaan O

    2008-11-01

    Dupuytren's disease is a common fibroproliferative condition of the hand characterized by fibrotic lesions (nodules and cords), leading to disability through progressive digital contracture. Although the etiology of the disease is poorly understood, recent evidence suggests that abnormal matrix metalloproteinase (MMP) activity may play a role in cell-mediated collagen contraction and tissue scarring. The aim of this study was to investigate the efficacy of ilomastat, a broad-spectrum MMP inhibitor, in an in vitro model of Dupuytren fibroblast-mediated contraction. Nodule-derived and cord-derived fibroblasts were isolated from Dupuytren patients; carpal ligament-derived fibroblasts acted as control. Stress-release fibroblast-populated collagen lattices (FPCLs) were used as a model of contraction. FPCLs were allowed to develop mechanical stress (48 hours) during treatment with ilomastat (0-100 micromol/L), released, and allowed to contract over a 48-hour period. Contraction was estimated by measuring lattice area compared with untreated cells or treatment with a control peptide. MMP-1, MMP-2, and MT1-MMP levels were assessed by zymography, Western blotting, and enzyme-linked immunosorbent assay. Nodule-derived fibroblasts contracted lattices (69% +/- 2) to a greater extent than did cord-derived (55% +/- 3) or carpal ligament-derived (55% +/- 1) fibroblasts. Exposure to ilomastat led to significant inhibition of lattice contraction by all fibroblasts, although a reduction in lattice contraction by nodule-derived fibroblasts was most prominent (84% +/- 8). In addition, treatment with ilomastat led to a concomitant suppression of MMP-1 and MMP-2 activity, whereas MT1-MMP activity was found to be upregulated. Our results demonstrate that inhibition of MMP activity results in a reduction in extracellular matrix contraction by Dupuytren fibroblasts and suggest that MMP activity may be a critical target in preventing recurrent contracture caused by this disease.

  18. Analysis of Developed Country's Export Contract and Contract Risk and Development of Sample Contract and Guide

    International Nuclear Information System (INIS)

    Lee, D. S.; Oh, K. B.; Chung, W. S.; Lee, K. S.; Yun, S. W.; Lee, J. H.; Lee, B. W.; Kim, H. J.; Yang, M. H.

    2008-10-01

    This paper aimed at developing legal support for the non nuclear power plant industry's export. This study aids establishing government policy and promoting export of non nuclear power plant industry. This paper treated analysis of contractual risk and caution before entering into contract. To promote continuing export result, governmental and legal aids and guide will be required continuously. This study showed risks related with export contract and explained export control acts and procedures

  19. Optimal Long-Term Financial Contracting

    OpenAIRE

    Peter M. DeMarzo; Michael J. Fishman

    2007-01-01

    We develop an agency model of financial contracting. We derive long-term debt, a line of credit, and equity as optimal securities, capturing the debt coupon and maturity; the interest rate and limits on the credit line; inside versus outside equity; dividend policy; and capital structure dynamics. The optimal debt-equity ratio is history dependent, but debt and credit line terms are independent of the amount financed and, in some cases, the severity of the agency problem. In our model, the ag...

  20. Making a clean break: addiction and Ulysses contracts.

    Science.gov (United States)

    Andreou, Chrisoula

    2008-01-01

    I examine current models of self-destructive addictive behaviour, and argue that there is an important place for Ulysses contracts in coping with addictive behaviour that stems from certain problematic preference structures. Given the relevant preference structures, interference based on a Ulysses contract need not involve questionably favouring an agent's past preferences over her current preferences, but can actually be justified in terms of the agent's current concerns and commitments.

  1. Contract-oriented software development for internet services

    DEFF Research Database (Denmark)

    Giambiagi, Pablo; Owe, Olaf; Ravn, Anders Peter

    2008-01-01

    COSoDIS (Contract-Oriented Software Development for Internet Services) develops novel approaches to implement and reason about contracts in service oriented architectures (SOA). The rationale is that system developers benefit from abstraction mechanisms to work with these architectures. Therefore...... the goal is to design and test system modeling and programming language tools to empower SOA developers to deploy highly dynamic, negotiable and monitorable Internet services....

  2. U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies

    Science.gov (United States)

    2011-11-07

    Report No. DODIG-2012-017 November 7, 2011 U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies...Contracting and Gift Policies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...HERITAGE AND HISTORY COMMAND SUBJECT: U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies (Report No. DODIG-2012-017) We are

  3. The Performance Blueprint: An Integrated Logic Model Developed To Enhance Performance Measurement Literacy: The Case of Performance-Based Contract Management.

    Science.gov (United States)

    Longo, Paul J.

    This study explored the mechanics of using an enhanced, comprehensive multipurpose logic model, the Performance Blueprint, as a means of building evaluation capacity, referred to in this paper as performance measurement literacy, to facilitate the attainment of both service-delivery oriented and community-oriented outcomes. The application of this…

  4. Comparative Contract Law & Economics

    NARCIS (Netherlands)

    Kovac, M.

    2008-01-01

    This work is a search for deeper understanding of established differences and similarities among compared legal systems. The application of economically inspired optimal model rule as a uniform term of comparison provides additional insights into some of the most often discussed legal issues. The

  5. Analyzing Web Service Contracts

    DEFF Research Database (Denmark)

    Cambronero, M.-Emilia; Okika, Joseph C.; Ravn, Anders Peter

    2007-01-01

    Web services should be dependable, because businesses rely on them. For that purpose the Service Oriented Architecture has standardized specifications at a syntactical level. In this paper, we demonstrate how such specifications are used to derive semantic models in the form of (timed) automata...

  6. Orchestrating with Contracts

    DEFF Research Database (Denmark)

    Kiniry, Joseph Roland; Martinez, Josu

    2012-01-01

    of the units under composition. Orc is an executable language, and in the Orc system, units are realized as methods implemented in the Java programming language. Since Java methods' behavior can be formally specified with the Java Modeling Language (JML), then the behavior of an Orc program can be reasoned...

  7. Governance variety in the energy service contracting market

    Energy Technology Data Exchange (ETDEWEB)

    Ostertag, Katrin; Huelsmann, Friederike

    2008-07-01

    There is a surprisingly high variety of actors involved in the supply of energy service contracting arrangements. Based on an empirical record of approximately 2,500 contracting projects in the domain of space heating in Germany, the paper analyses specialisation patterns of contractors. An econometric model is used to test hypotheses derived from transaction cost economics, which contractor type should be expected for which kind of contracting project. According to our results, if physical, site and human asset specificity are high, governance modes are preferred, for which contracting represents a downward integration of business activities along the value-added chain. This includes the supply of contracting by municipal utilities. More specifically, municipal utilities occur as superior suppliers of contracting if combined heat and power is implemented, if the building served is connected to their gas grid and if it is a public building. This pattern could orient the development of contracting activities for utilities reconsidering their strategic position following the liberalisation of the electricity market. (orig.)

  8. Preferred supplier contracts in post-patent prescription drug markets.

    Science.gov (United States)

    Blankart, Carl Rudolf; Stargardt, Tom

    2016-02-22

    In recent years, the expiration of patents for large drug classes has increased the importance of post-patent drug markets. However, previous research has focused solely on patent drug markets. In this study, the authors evaluate the influence of preferred supplier contracts, the German approach to tendering, in post-patent drug markets using a hierarchical market share attraction model. The authors find that preferred supplier contracts are a powerful strategic instrument for generic manufacturers in a highly competitive environment. They quantify the effects of signing a preferred supplier contract and show that brand-name manufacturers are vulnerable to tendering. Therefore, brand-name manufacturers should readjust their strategies and consider including preferred supplier contracts in their marketing mix. In addition, the authors employ a simulation to demonstrate that a first-mover advantage might be gained from signing a preferred supplier contract. Furthermore, their results can be used as a blueprint for decision makers in the pharmaceutical industry to assess the market share effects of different contracting strategies regarding preferred supplier contracts.

  9. Next Indefinite Contract review exercise

    CERN Multimedia

    2015-01-01

    Dear Colleagues, We are pleased to inform you that the 2015 LD2IC exercise (selection process for the conversion of limited-duration contracts into indefinite contracts) has been officially launched. The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 3 August 2015 for a period of four weeks (until 31 August 2015). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions (FAQ) and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: We would like to remind you that all staff members holding a limited-duration contract who have successfully completed their probation period at the time of application and who meet the eligibility criteria in the vacancy notices (VNs) are eligible to apply for posts for the awa...

  10. Next Indefinite Contract review exercise

    CERN Multimedia

    HR Department

    2015-01-01

    Dear Colleagues, We are pleased to inform you that the 2015 LD2IC exercise (selection process for the conversion of limited-duration contracts into indefinite contracts) has been officially launched. The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 3 August 2015 for a period of four weeks (until 31 August 2015). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions (FAQ) and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: We would like to remind you that all staff members holding a limited-duration contract who have successfully completed their probation period at the time of application and who meet the eligibility criteria in the vacancy notices (VNs) are eligible to apply for posts for the award of a...

  11. Termination of Commercial Contracts by giving Notice

    DEFF Research Database (Denmark)

    Edlund, Hans Henrik

    2008-01-01

    Some long-term contracts are brought to an end if one of the parties gives notice. Usually, such a step is not considered a breach of contract. It causes the contract to end in accordance with the contract. When no express rules cover the situation, it is often not entirely clear whether or not t...

  12. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  13. 48 CFR 39.107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer...

  14. 48 CFR 904.7201 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 904.7201... MATTERS Public Affairs 904.7201 Contract clause. The contracting officer shall insert the clause at 952.204-75, Public Affairs, in solicitations and contracts that require the contractor to release...

  15. 48 CFR 803.7001 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 803.7001... Practices 803.7001 Contract clause. The contracting officer shall insert the clause at 852.203-71, Display of Department of Veterans Affairs Hotline poster, in solicitations and contracts expected to equal or...

  16. 48 CFR 819.7009 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 819.7009... Acquisition Program 819.7009 Contract clauses. The contracting officer shall insert VAAR clause 852.219-10... Veteran-Owned Small Business Set-Aside in solicitations and contracts for acquisitions under this subpart. ...

  17. 48 CFR 745.106 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 745.106 Section 745.106 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 745.106 Contract clauses. (a) The contracting officer shall insert the...

  18. 48 CFR 846.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 846.710 Section 846.710 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 846.710 Contract clauses. The contracting officer shall insert the clause at...

  19. 48 CFR 903.971 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 903.971... Contract clause. The contracting officer shall insert the clause at 952.203-70, Whistleblower Protection for Contractor Employees, in contracts that involve work to be done on behalf of DOE directly related...

  20. 48 CFR 747.507 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  1. 48 CFR 871.212 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 871.212... Rehabilitation and Employment Service 871.212 Contract clauses. Contracting officers must use the following clauses, as appropriate, in solicitations and contracts for vocational rehabilitation and employment...

  2. 48 CFR 53.111 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contract clause. 53.111... AND FORMS FORMS General 53.111 Contract clause. Contracting officers shall insert the clause at 52.253-1, Computer Generated Forms, in solicitations and contracts that require the contractor to submit...

  3. 48 CFR 833.215 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 833.215 Section 833.215 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 833.215 Contract clause. The contracting...

  4. 48 CFR 947.7002 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 947.7002 Section 947.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT TRANSPORTATION Foreign Travel 947.7002 Contract clause. When foreign travel may be required under the contract...

  5. 48 CFR 811.404 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.404... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 811.404 Contract clause. When delivery is required by or on a particular date for f.o.b. destination contracts, the contracting officer...

  6. 48 CFR 925.7004 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 925.7004... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7004 Contract clause. The contracting... solicitations and contracts involving nuclear hot cell services. This clause does not flow down to second-tier...

  7. 77 FR 71642 - New International Mail Contract

    Science.gov (United States)

    2012-12-03

    ... Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a... Services 3 contract. This document invites public comments on the request and addresses several related... Expedited Package Services (GEPS) 3 contract (Contract).\\1\\ The Notice was filed in accordance with 39 CFR...

  8. 77 FR 54937 - International Mail Postal Contract

    Science.gov (United States)

    2012-09-06

    ... recently-filed Postal Service filing addressing a new International Business Reply Service Contract 3. It... contract within the International Business Reply Service (IBRS) Competitive Contract 3 grouping.\\1\\ The... Service Filing of a Functionally Equivalent International Business Reply Service Competitive Contract 3...

  9. 48 CFR 22.610 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Walsh-Healey Public Contracts Act 22.610... Contracts Act, in solicitations and contracts covered by the Act (see 22.603, 22.604, and 22.605). [61 FR... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clause. 22.610...

  10. 48 CFR 970.1504 - Contract pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  11. 48 CFR 432.412 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clause. 432.412 Section 432.412 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for Non-Commercial Items 432.412 Contract clause. The decision...

  12. Modelo de contrato de terceirização de manutenção: uma abordagem principal-agente Model contract for outsourcing of maintenance: a principal-agent approach

    Directory of Open Access Journals (Sweden)

    Jonas Alves de Paiva

    2012-12-01

    Full Text Available A terceirização é uma das soluções utilizadas para se reduzir esforços em atividades não relacionadas com a atividade de produção. Na terceirização da manutenção, modelos de contratos de incentivos existentes na literatura focam como principais indicadores de controle apenas o tempo de reparo e o custo das atividades de manutenção. O principal objetivo desse trabalho consiste em apresentar um modelo de incentivos considerando também outras variáveis que são afetadas pela manutenção e que afetam fortemente o lucro, que são a qualidade dos produtos produzidos e a redução da capacidade de produção. O trabalho utiliza a teoria principal-agente para modelar um contrato de incentivos que conduz a um aumento do lucro da empresa, forçando o agente a desenvolver atividades que maximizem esse lucro. É apresentada uma exemplificação numérica, que evidencia o impacto positivo nos resultados da empresa, além da generalização e adequação do modelo.The outsourcing is being used to reduce work on activities not related to production activities. Nowadays, the models of contracts of maintenance use the repair time and the cost of maintenance activities as main control indicator to estimate the political of incentives. The main objective of this paper is to introduce a model of incentives considering other variables that affect substantially the profit and that they are affected by the maintenance activities as the quality of products produced and the reduction of production capacity. The paper uses the Principal-Agent Theory to develop an incentive contract that leads the agent to execute activities that maximize the profit. It is used a numerical example in order to highlight the positive impact on company results, in addition to the generalization and adaptation of the model.

  13. Incentive contracts for development projects

    Science.gov (United States)

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  14. Claims in civil engineering contracts

    CERN Document Server

    Speirs, N A

    1999-01-01

    This paper considers claims arising during civil engineering construction contracts. The meaning of the word 'claim' is considered and its possible implications for additional cost and time to completion. The conditions of the construction contract selected will influence the risk apportionment between contractor and client and the price offered by the contractor for the work. Competitive bidding constraints and profit margins in the construction industry, however, may also influence the price offered. This in turn can influence the likelihood of claims arising. The client from his point of view is concerned to complete the work within an agreed time and budget. The circumstances under which claims may arise are reviewed in relation to typical conditions of contract. These circumstances are then related to the CERN LHC civil works. Ways of avoiding claims, where this is possible, are considered. Finally, the means of evaluation of claims and their settlement are considered.

  15. Micro and small firms contracted the works of third sector contracting and public

    Directory of Open Access Journals (Sweden)

    Daniela Juliano Silva

    2015-06-01

    Full Text Available In a scenario of successive changes, we are faced today with a "new" State of design (First Sector subsidiary and developer, embracing new contracting models, involving private non-profit institutions (Third Sector ahead of social services relevance (health, education, technology, among others. To comply with the obligations entered into with the public entity (end-obligations, this Third Sector performs hires (to perform their half-bonds with the second sector (market, where they operate Micro and Small Businesses. This study aims a reflective look at these contracts, usually the result of simplified bidding process in order to verify their specificities and whether they take place in compliance with the prerogatives and differential treatment meted especially those business companies (art. 170, X, SC / 1988. In this endeavor, it was decided, besides a literature review by an investigative approach from the point of view of three different social organizations that have management contracts in health care with public entities and therefore have signed contracts with ME and EPP for the fulfillment of their obligations to the government.      

  16. Terms of payment in the sales contract

    OpenAIRE

    Harmáčková, Iva

    2009-01-01

    This thesis makes an analysis of price and terms of payment in the sales contract. Both elements are conceived in terms of legal framework and in terms of importance for the parties to an international sales contract. The theoretical part deals with the role of the sales contract in business relations, structure and legal norms of the international sales contract. The practical part includes an analysis of specific international sales contract.

  17. Outsourcing Contract Success: A Quality Management Perspective

    OpenAIRE

    Vanita Yadav; B.A. Metri

    2010-01-01

    Despite the phenomenal growth in outsourcing of various business functions like Enterprise Systems outsourcing, IT outsourcing, and Business Process outsourcing, there has been relatively less attention given to the high-risk area of outsourcing contracts. In this regard, contract has been the conventional medium for governing outsourcing relationships. This study aims to bring forward the importance of quality in the entire contracting process, involving contract planning, pre-contract negot...

  18. The Contracting Parties' Ability To Conclude The Employment Contract

    Directory of Open Access Journals (Sweden)

    Carmen Constantina NENU

    2014-08-01

    Full Text Available This study's main objective is to analyze certain effects produced by the changes of the Labor Code and by the entry into force of the current Romanian Civil Code. These effects refer to one of the fundamental conditions for the valid conclusion of the individual employment contract, that is, to the legal capacity of employers and employees. Thus, a complete analysis of legal regulations and of the correlations between different provisions on the legal capacity of parties to the individual employment contract is required to identify the existing noncompliance and to propose solutions. The research demonstrated that the current regulatory framework governing the legal capacity of the parties to an individual employment contract does not entirely correspond to the social reality. Therefore, only the employer benefits from a relatively comprehensive statutory regulation on the legal capacity to conclude an individual employment contract. The employee, however, does not benefit from the same attention from legislature. Considering the above, the study represents a significant scientific contribution, whose value lies in the proposed changes to modify legislature, so that the legal capacity of job holders would benefit from fair regulation, in accordance with the principle of legal protection of employee rights.

  19. A chemo-mechanical free-energy-based approach to model durotaxis and extracellular stiffness-dependent contraction and polarization of cells.

    Science.gov (United States)

    Shenoy, Vivek B; Wang, Hailong; Wang, Xiao

    2016-02-06

    We propose a chemo-mechanical model based on stress-dependent recruitment of myosin motors to describe how the contractility, polarization and strain in cells vary with the stiffness of their surroundings and their shape. A contractility tensor, which depends on the distribution of myosin motors, is introduced to describe the chemical free energy of the cell due to myosin recruitment. We explicitly include the contributions to the free energy that arise from mechanosensitive signalling pathways (such as the SFX, Rho-Rock and MLCK pathways) through chemo-mechanical coupling parameters. Taking the variations of the total free energy, which consists of the chemical and mechanical components, in accordance with the second law of thermodynamics provides equations for the temporal evolution of the active stress and the contractility tensor. Following this approach, we are able to recover the well-known Hill relation for active stresses, based on the fundamental principles of irreversible thermodynamics rather than phenomenology. We have numerically implemented our free energy-based approach to model spatial distribution of strain and contractility in (i) cells supported by flexible microposts, (ii) cells on two-dimensional substrates, and (iii) cells in three-dimensional matrices. We demonstrate how the polarization of the cells and the orientation of stress fibres can be deduced from the eigenvalues and eigenvectors of the contractility tensor. Our calculations suggest that the chemical free energy of the cell decreases with the stiffness of the extracellular environment as the cytoskeleton polarizes in response to stress-dependent recruitment of molecular motors. The mechanical energy, which includes the strain energy and motor potential energy, however, increases with stiffness, but the overall energy is lower for cells in stiffer environments. This provides a thermodynamic basis for durotaxis, whereby cells preferentially migrate towards stiffer regions of the

  20. Forthcoming indefinite contract review procedure

    CERN Document Server

    HR Department

    2011-01-01

    The vacancy notices for posts opened with a view to the award of an indefinite contract will be published as from the last week of September.  In the meantime, the list of posts to be opened is available at the following address: https://hr-recruit.web.cern.ch/hr-recruit/staff/Autumn_2011_listofslots.pdf Information sessions for candidates are being organised for 26 and 27 September 2011. For more information please consult:  https://hr-recruit.web.cern.ch/hr-recruit/staff/IndefiniteContracts.asp

  1. Some ancestors of contraction analysis

    DEFF Research Database (Denmark)

    Jouffroy, Jerome

    2005-01-01

    Contraction analysis is a recent tool for analyzing the convergence behavior of nonlinear systems in state-space form (see Lohmiller and Slotine [16] for the main reference). However, it seems that earlier results derived by mathematicians in the 1950s closely match some of the results of contrac......Contraction analysis is a recent tool for analyzing the convergence behavior of nonlinear systems in state-space form (see Lohmiller and Slotine [16] for the main reference). However, it seems that earlier results derived by mathematicians in the 1950s closely match some of the results...

  2. Team incentives in relational contracts

    International Nuclear Information System (INIS)

    Kvaloey, Ola

    2003-01-01

    Incentive schemes for teams are compared. I ask: under which conditions are relational incentive contracts based on joint performance evaluation, relative performance evaluation and independent performance evaluation self-enforceable. The framework of Che and Yoo (2001) on team incentives is combined with the framework of Baker, Gibbons and Murphy (2002) on relational contracts. In a repeated game between one principal and two agents, I find that incentives based on relative or independent performance are expected to dominate when the productivity of effort is high, while joint performance evaluation dominates when productivity is low. Incentives based on independent performance are more probable if the agents own critical assets. (author)

  3. Debt renegotiation with incomplete contract

    Directory of Open Access Journals (Sweden)

    Paulo de Melo Jorge Neto

    2005-09-01

    Full Text Available A debt contract usually does not include a provision about renegotiation. The right to seize the borrower’s asset and the rules of this process are usually stipulated in the contract. Such a promise not to renegotiate is not credible since renegotiation can mitigate the dead-weight loss of liquidating insolvent borrowers. Once the initial contract may not consider the renegotiation procedure and renegotiation may occur, this paper investigates why a complete contract is not offered. It shows that the lender does not need to stipulate the renegotiation procedure on the initial contract because he is indifferent about committing or not to the terms of a contract. This indicates that a complete contract gives the lender the same expected return as an incomplete contract, in which the renegotiation process is determined after the occurrence of default.Um contrato de débito geralmente não inclui uma cláusula sobre renegociação. O direito de liquidar os ativos do tomador e as regras do processo são habitualmente estipuladas no contrato. Tal promessa de não renegociar não é crível, já que a renegociação pode mitigar a perda bruta de se liquidar tomadores insolventes. Uma vez que o contrato inicial pode não considerar os procedimentos de renegociação, e esta pode, de fato, vir a ocorrer, este artigo investiga a razão de um contrato completo não ser ofertado. Mostra-se que o emprestador não precisa estipular os procedimentos de renegociação no contrato inicial porque ele é indiferente entre se comprometer ou não aos termos do contrato. Isto indica que um contrato completo dá ao emprestador o mesmo retorno esperado de um contrato incompleto, no qual os procedimentos de renegociação são determinados após a declaração de default.

  4. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Science.gov (United States)

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  5. Linking apple farmers to markets: Determinants and impacts of marketing contracts in China

    OpenAIRE

    Ma, Wanglin; Abdulai, Awudu

    2015-01-01

    This study investigates the determinants of marketing contract choices and the related impact on farm net returns of apple farmers in China. We employ a two-stage selection correction approach (BFG) for the multinomial logit model. On the basis of the BFG estimation, we also use an endogenous switching regression model and a propensity score matching technique to estimate the causal effects of marketing contract choices on net returns. The empirical results reveal that written contracts incre...

  6. Performance test results of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Inagaki, Yoshiyuki; Hayashi, Koji; Kato, Michio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    2003-03-01

    Research on a hydrogen production system by steam reforming of methane, chemical reaction; CH{sub 4} + H{sub 2}O {yields} 3H{sub 2}O + CO, has been carried out to couple with the HTTR for establishment of high-temperature nuclear heat utilization technology and contribution to hydrogen energy society in future. The mock-up test facility with a full-scale reaction tube test facility, a model simulating one reaction tube of a steam reformer of the HTTR hydrogen production system in full scale, was fabricated to perform tests on controllability, hydrogen production performance etc. under the same pressure and temperature conditions as those of the HTTR hydrogen production system. The design and fabrication of the test facility started from 1997, and the all components were installed until September in 2001. In a performance test conducted from October in 2001 to February in 2002, performance of each component was examined and hydrogen of 120m{sup 3}{sub N}/h was successfully produced with high-temperature helium gas. This report describes the performance test results on components performance, hydrogen production characteristics etc., and main troubles and countermeasures. (author)

  7. Performance test results of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system. Contract research

    International Nuclear Information System (INIS)

    Inagaki, Yoshiyuki; Hayashi, Koji; Kato, Michio

    2003-03-01

    Research on a hydrogen production system by steam reforming of methane, chemical reaction; CH 4 + H 2 O → 3H 2 O + CO, has been carried out to couple with the HTTR for establishment of high-temperature nuclear heat utilization technology and contribution to hydrogen energy society in future. The mock-up test facility with a full-scale reaction tube test facility, a model simulating one reaction tube of a steam reformer of the HTTR hydrogen production system in full scale, was fabricated to perform tests on controllability, hydrogen production performance etc. under the same pressure and temperature conditions as those of the HTTR hydrogen production system. The design and fabrication of the test facility started from 1997, and the all components were installed until September in 2001. In a performance test conducted from October in 2001 to February in 2002, performance of each component was examined and hydrogen of 120m 3 N /h was successfully produced with high-temperature helium gas. This report describes the performance test results on components performance, hydrogen production characteristics etc., and main troubles and countermeasures. (author)

  8. Muscle contraction increases carnitine uptake via translocation of OCTN2

    Energy Technology Data Exchange (ETDEWEB)

    Furuichi, Yasuro [Graduate School of Natural Science and Technology, Kanazawa University, Kanazawa (Japan); Sugiura, Tomoko; Kato, Yukio [Faculty of Pharmacy, Kanazawa University, Kanazawa (Japan); Takakura, Hisashi [Faculty of Human Sciences, Kanazawa University, Kanazawa (Japan); Hanai, Yoshiteru [Nagoya Institute of Technology, Nagoya (Japan); Hashimoto, Takeshi [Ritsumeikan University, Kusatsu (Japan); Masuda, Kazumi, E-mail: masuda@ed.kanazawa-u.ac.jp [Faculty of Human Sciences, Kanazawa University, Kanazawa (Japan)

    2012-02-24

    Highlights: Black-Right-Pointing-Pointer Muscle contraction augmented carnitine uptake into rat hindlimb muscles. Black-Right-Pointing-Pointer An increase in carnitine uptake was due to an intrinsic clearance, not blood flow. Black-Right-Pointing-Pointer Histochemical analysis showed sarcolemmal OCTN2 was emphasized after contraction. Black-Right-Pointing-Pointer OCTN2 protein in sarcolemmal fraction was increased in contracting muscles. -- Abstract: Since carnitine plays an important role in fat oxidation, influx of carnitine could be crucial for muscle metabolism. OCTN2 (SLC22A5), a sodium-dependent solute carrier, is assumed to transport carnitine into skeletal muscle cells. Acute regulation of OCTN2 activity in rat hindlimb muscles was investigated in response to electrically induced contractile activity. The tissue uptake clearance (CL{sub uptake}) of L-[{sup 3}H]carnitine during muscle contraction was examined in vivo using integration plot analysis. The CL{sub uptake} of [{sup 14}C]iodoantipyrine (IAP) was also determined as an index of tissue blood flow. To test the hypothesis that increased carnitine uptake involves the translocation of OCTN2, contraction-induced alteration in the subcellular localization of OCTN2 was examined. The CL{sub uptake} of L-[{sup 3}H]carnitine in the contracting muscles increased 1.4-1.7-fold as compared to that in the contralateral resting muscles (p < 0.05). The CL{sub uptake} of [{sup 14}C]IAP was much higher than that of L-[{sup 3}H]carnitine, but no association between the increase in carnitine uptake and blood flow was obtained. Co-immunostaining of OCTN2 and dystrophin (a muscle plasma membrane marker) showed an increase in OCTN2 signal in the plasma membrane after muscle contraction. Western blotting showed that the level of sarcolemmal OCTN2 was greater in contracting muscles than in resting muscles (p < 0.05). The present study showed that muscle contraction facilitated carnitine uptake in skeletal muscles, possibly

  9. SSC Test Operations Contract Overview

    Science.gov (United States)

    Kleim, Kerry D.

    2010-01-01

    This slide presentation reviews the Test Operations Contract at the Stennis Space Center (SSC). There are views of the test stands layouts, and closer views of the test stands. There are descriptions of the test stand capabilities, some of the other test complexes, the Cryogenic propellant storage facility, the High Pressure Industrial Water (HPIW) facility, and Fluid Component Processing Facility (FCPF).

  10. Jazzing up the Psychological Contract

    Science.gov (United States)

    Hartley, Nell Tabor

    2010-01-01

    Helping students and practitioners to understand and utilize the Psychological Contract is often a difficult task. Unlike fault-finding research, this paper presents the PC as a positive, vibrant and valuable tool. In an effort to make the concept less elusive, the paper draws upon the metaphor of jazz. The metaphor is an accepted tool of…

  11. The Strange Notion of Contract

    NARCIS (Netherlands)

    Lock, G.E.

    2007-01-01

    The notion of contract is not as unproblematic as might at first sight appear. Its theoretical basis in particular is very difficult to decipher. It is arguable that whereas the Middle Ages and 16th century produced an exceptionally subtle foundational account, the rise of modernity largely

  12. Informal Institutions and Intergenerational Contracts

    DEFF Research Database (Denmark)

    Lassen, David Dreyer; Lilleør, Helene Bie

    This paper carries out a theoretical and empirical investigation of the role of informal institutions in facilitating intergenerational contracts governing investments in schooling and payments of pensions in the form of remittances. We show, using detailed household level data from rural Tanzania...

  13. Forestry contracting in South Africa

    CSIR Research Space (South Africa)

    Khosa, M

    2000-01-01

    Full Text Available of their workers directly to a contractor system. For example, forest contractors are now hired to carry out planting, tending and silvicultural operations. Sappi Forests, Mondi Forests and Safcol are all contracting certain work out and are currently assisting...

  14. Supply contract and portfolio insurance

    Science.gov (United States)

    Runsheng Yin; Bob Izlar

    2001-01-01

    The long-term growth of institutional timberland investments depends on the ability of timberland investment management organizations (TIMO) to deal effectively with securitization, leveraging, arbitraging, supply contracting, portfolio insurance, tax efficiency enhancement, and other issues. Financial engineering holds great promise for many of these issues. This...

  15. AGILE DRAFTING OF OUTSOURCING CONTRACTS

    DEFF Research Database (Denmark)

    Schlichter, Bjarne Rerup; Storgaard, Kristian

    2015-01-01

    and in several parallel tracks using different competencies. By the use of an illustrative case-study, this paper explores how scrum can be applied to enhance the process of drafting outsourcing contracts. The analysis indicates that the use of an agile method, such as Scrum, can be beneficial in this context...

  16. Incomplete contract and divisional structures

    NARCIS (Netherlands)

    Bao, T.; Wang, Y.

    2009-01-01

    In this paper we want to analyze the internal divisional structure within an organi- zation in the framework of incomplete contract theory. We use the framework of Aghion and Tirole (1997) and define the managerial control structure as \\sequence of search". A key feature of this paper which

  17. Construction contract revenue recording comparison

    Directory of Open Access Journals (Sweden)

    Hana Bohušová

    2008-01-01

    Full Text Available Publicly traded companies prepare their consolidated accounts in conformity with the international accounting standards (IAS/IFRS in accordance with the Regulation No. 1606/2002. This is obliged for all publicly traded joint-stock companies in the Czech Republic. Other companies prepare financial statements in accordance with national accounting standards. There are Accounting Act No. 563/1991 of Coll. and Regulation No. 500/2002 of Coll., Czech Accounting Standards in the Czech Republic. Both systems are based on different principles so there are many differences. The Czech Accounting System (CAS is based on the rules while IAS/IFRS are based on principles (Kovanicová, 2005. These differences are mainly caused by the different philosophy. CAS prefers the fiscal policy to the economic substance while IAS/IFRS prefere the economic substance. One of the most significant dif­fe­ren­ces is in the field of revenue recording. There are two standards concerning the revenues recording (IAS 18 − Revenue, IAS 11 – Construction Contracts in IAS/IFRS. CAS 019 – Expenses and Revenue are dealing with the revenue recording in the Czech Republic. The paper is aimed at the comparison of the methodical approaches for revenue recording used by IAS/IFRS and by CAS. The most important differences are caused by the different approach to the long term contracts (construction contracts, software development contracts revenues recording.

  18. Bariatric surgery improves the cavernosal neuronal, vasorelaxation, and contraction mechanisms for erectile dysfunction as result of amelioration of glucose homeostasis in a diabetic rat model.

    Directory of Open Access Journals (Sweden)

    Yong Sun Choi

    Full Text Available Bariatric surgery is an effective treatment option for both obesity and obesity-related type 2 diabetes mellitus (T2DM. However, little is known regarding the effects of bariatric surgery on erectile dysfunction among patients with T2DM. Therefore, we investigated whether bariatric surgery would lead to structural and biochemical changes in the corpus cavernosum.Twenty-five male Otsuka Long-Evans Tokushima Fatty rats were assigned to either a control group (sham operation, n = 10 or a bariatric surgery group (gastric bypass surgery, n = 15. Four weeks after the operation, each group of rats was evaluated with an oral glucose tolerance test (OGTT. The penile intracavernous pressure was measured for erectile functional analysis. Histologic evaluation of the tissue was performed with Masson's trichrome staining. Endothelial nitric oxide synthase (eNOS, neuronal nitric oxide synthase (nNOS, Rho kinase, and 8-hydroxy-2-deoxyguanosine (8-OHdG levels in the corpus cavernosum were assayed by using western blot and ELISA.The mean body weight of the bariatric surgery group was lower than the control group (p = 0.002. The postoperative OGTT result was lower in the bariatric surgery group than in the control group (p = 0.014, and this was lower than the preoperative value (p = 0.037. The intracavernous pressure/mean arterial pressure ratio was higher in the bariatric surgery group compared to the control group (p = 0.021, and a higher cavernosum smooth muscle/collagen ratio was observed in the bariatric surgery group compared to the control group (p = 0.025. Likewise, the expression of eNOS and nNOS was higher in bariatric surgery group than in the control group (p = 0.027 and p = 0.008, respectively. Decreased expression of Rho kinase and levels of 8-OHdG were observed in the bariatric surgery group (p = 0.032.In this animal model, bariatric surgery appears to ameliorate T2DM-related metabolic dysfunction leading to

  19. Bariatric surgery improves the cavernosal neuronal, vasorelaxation, and contraction mechanisms for erectile dysfunction as result of amelioration of glucose homeostasis in a diabetic rat model.

    Science.gov (United States)

    Choi, Yong Sun; Lee, Sang Kuon; Bae, Woong Jin; Kim, Su Jin; Cho, Hyuk Jin; Hong, Sung-Hoo; Lee, Ji Youl; Hwang, Tae-Kon; Kim, Sae Woong

    2014-01-01

    Bariatric surgery is an effective treatment option for both obesity and obesity-related type 2 diabetes mellitus (T2DM). However, little is known regarding the effects of bariatric surgery on erectile dysfunction among patients with T2DM. Therefore, we investigated whether bariatric surgery would lead to structural and biochemical changes in the corpus cavernosum. Twenty-five male Otsuka Long-Evans Tokushima Fatty rats were assigned to either a control group (sham operation, n = 10) or a bariatric surgery group (gastric bypass surgery, n = 15). Four weeks after the operation, each group of rats was evaluated with an oral glucose tolerance test (OGTT). The penile intracavernous pressure was measured for erectile functional analysis. Histologic evaluation of the tissue was performed with Masson's trichrome staining. Endothelial nitric oxide synthase (eNOS), neuronal nitric oxide synthase (nNOS), Rho kinase, and 8-hydroxy-2-deoxyguanosine (8-OHdG) levels in the corpus cavernosum were assayed by using western blot and ELISA. The mean body weight of the bariatric surgery group was lower than the control group (p = 0.002). The postoperative OGTT result was lower in the bariatric surgery group than in the control group (p = 0.014), and this was lower than the preoperative value (p = 0.037). The intracavernous pressure/mean arterial pressure ratio was higher in the bariatric surgery group compared to the control group (p = 0.021), and a higher cavernosum smooth muscle/collagen ratio was observed in the bariatric surgery group compared to the control group (p = 0.025). Likewise, the expression of eNOS and nNOS was higher in bariatric surgery group than in the control group (p = 0.027 and p = 0.008, respectively). Decreased expression of Rho kinase and levels of 8-OHdG were observed in the bariatric surgery group (p = 0.032). In this animal model, bariatric surgery appears to ameliorate T2DM-related metabolic dysfunction leading to

  20. On Convergence of the Unscented Kalman-Bucy Filter using Contraction Theory

    DEFF Research Database (Denmark)

    Maree, J.P.; Imsland, Lars; Jouffroy, Jerome

    2016-01-01

    Contraction theory entails a theoretical framework in which convergence of a nonlinear system can be analysed differentially in an appropriate contraction metric. This paper is concerned with utilizing stochastic contraction theory to conclude on exponential convergence of the Unscented Kalman......-Bucy Filter. The underlying process and measurement models of interest are Itô-type stochastic differential equations. In particular, statistical linearisation techniques are employed in a virtual-actual systems framework to establish deterministic contraction of the estimated expected mean of process values....... Under mild conditions of bounded process noise, we extend the results on deterministic contraction to stochastic contraction of the estimated expected mean of process state. It follows that for regions of contraction, a result on convergence, and thereby incremental stability, is concluded...