WorldWideScience

Sample records for minimum power requirements

  1. Minimum critical power ratio control device for nuclear power plants

    International Nuclear Information System (INIS)

    Kurosawa, Tsuneo.

    1991-01-01

    Reactor core flowrate is determined by comparing a minimum critical power ratio calculated based on the status amount of a nuclear power plant and a control value for the minimum critical power ratio that depends on the reactor core flowrate. Further, the minimum critical power ratio and a control value for the minimum critical power ratio that depends on the reactor thermal power are compared to set a reactor thermal power converted to a reactor core flowrate. Deviation between the thus determined reactor core flowrate and the present reactor core flowrate is calculated. When the obtained deviation is lower than a rated value, a reactor core flowrate set signal is generated to a reactor flowrate control means, to control the reactor power by a recycling flowrate control system of the reactor. On the other hand, when the deviation exceeds the determined value, the reactor core flowrate set signal is converted into a reactor thermal power, to control the position of control rods and control the reactor power. Then, monitor and control can be conducted safely and automatically without depending on operator's individual ability over the entire operation range corresponding to load following operation. (N.H.)

  2. Requirements for the support power systems of CANDU nuclear power plants

    International Nuclear Information System (INIS)

    1990-08-01

    This Standard covers principal criteria and requirements for design, fabrication, installation, qualification, inspection, and documentation for assurance that support power will be available as required. The minimum requirements for support power are determined by the special safety systems and other safety-related systems that must function to ensure that the public health risk is acceptably low. Support power systems of a CANDU nuclear power plant include those parts of the electrical systems and instrument air systems that are necessary for the operation of safety-related systems

  3. 12 CFR 932.8 - Minimum liquidity requirements.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Minimum liquidity requirements. 932.8 Section... CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.8 Minimum liquidity requirements. In addition to meeting the deposit liquidity requirements contained in § 965.3 of this chapter, each Bank...

  4. 9 CFR 147.51 - Authorized laboratory minimum requirements.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Authorized laboratory minimum requirements. 147.51 Section 147.51 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE... Authorized Laboratories and Approved Tests § 147.51 Authorized laboratory minimum requirements. These minimum...

  5. 12 CFR 567.2 - Minimum regulatory capital requirement.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Minimum regulatory capital requirement. 567.2... Regulatory Capital Requirements § 567.2 Minimum regulatory capital requirement. (a) To meet its regulatory capital requirement a savings association must satisfy each of the following capital standards: (1) Risk...

  6. Minimum power requirement for environmental control of aircraft

    International Nuclear Information System (INIS)

    Ordonez, Juan Carlos; Bejan, Adrian

    2003-01-01

    This paper addresses two basic issues in the thermodynamic optimization of environmental control systems (ECS) for aircraft: realistic limits for the minimal power requirement, and design features that facilitate operation at minimal power consumption. Four models are proposed and optimized. In the first, the ECS operates reversibly, the air stream in the cabin is mixed to one temperature, and the cabin experiences heat transfer with the ambient, across its insulation. The cabin temperature is fixed. In the second model, the fixed cabin temperature is assigned to the internal solid surfaces of the cabin, and a thermal resistance separates these surfaces from the air mixed in the cabin. In the third model, the ECS operates irreversibly, based on the bootstrap air cycle. The fourth model combines the ECS features of the third model with the cabin-environment interaction features of the second model. It is shown that in all models the temperature of the air stream that the ECS delivers to the cabin can be optimized for operation at minimal power. The effect of other design parameters and flying conditions is documented. The optimized air delivery temperature is relatively insensitive to the complexity of the model; for example, it is insensitive to the size of the heat exchanger used in the bootstrap air cycle. This study adds to the view that robustness is a characteristic of optimized complex flow systems, and that thermodynamic optimization results can be used for orientation in the pursuit of more complex and realistic designs

  7. 42 CFR 84.197 - Respirator containers; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Respirator containers; minimum requirements. 84.197... Cartridge Respirators § 84.197 Respirator containers; minimum requirements. Respirators shall be equipped with a substantial, durable container bearing markings which show the applicant's name, the type and...

  8. 42 CFR 84.174 - Respirator containers; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Respirator containers; minimum requirements. 84.174... Air-Purifying Particulate Respirators § 84.174 Respirator containers; minimum requirements. (a) Except..., durable container bearing markings which show the applicant's name, the type of respirator it contains...

  9. 42 CFR 84.134 - Respirator containers; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Respirator containers; minimum requirements. 84.134... Respirators § 84.134 Respirator containers; minimum requirements. Supplied-air respirators shall be equipped with a substantial, durable container bearing markings which show the applicant's name, the type and...

  10. 42 CFR 84.1134 - Respirator containers; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Respirator containers; minimum requirements. 84... Combination Gas Masks § 84.1134 Respirator containers; minimum requirements. (a) Except as provided in paragraph (b) of this section each respirator shall be equipped with a substantial, durable container...

  11. 42 CFR 84.74 - Apparatus containers; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Apparatus containers; minimum requirements. 84.74...-Contained Breathing Apparatus § 84.74 Apparatus containers; minimum requirements. (a) Apparatus may be equipped with a substantial, durable container bearing markings which show the applicant's name, the type...

  12. Probabilistic safety analysis of DC power supply requirements for nuclear power plants. Technical report

    International Nuclear Information System (INIS)

    Baranowsky, P.W.; Kolaczkowski, A.M.; Fedele, M.A.

    1981-04-01

    A probabilistic safety assessment was performed as part of the Nuclear Regulatory Commission generic safety task A-30, Adequacy of Safety Related DC Power Supplies. Event and fault tree analysis techniques were used to determine the relative contribution of DC power related accident sequences to the total core damage probability due to shutdown cooling failures. It was found that a potentially large DC power contribution could be substantially reduced by augmenting the minimum design and operational requirements. Recommendations included (1) requiring DC power divisional independence, (2) improved test, maintenance, and surveillance, and (3) requiring core cooling capability be maintained following the loss of one DC power bus and a single failure in another system

  13. 42 CFR 84.117 - Gas mask containers; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Gas mask containers; minimum requirements. 84.117... SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Gas Masks § 84.117 Gas mask containers; minimum requirements. (a) Gas masks shall be equipped with a substantial...

  14. 30 CFR 77.606-1 - Rubber gloves; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Rubber gloves; minimum requirements. 77.606-1... COAL MINES Trailing Cables § 77.606-1 Rubber gloves; minimum requirements. (a) Rubber gloves (lineman's gloves) worn while handling high-voltage trailing cables shall be rated at least 20,000 volts and shall...

  15. Minimum load reduction for once-through boiler power plants

    International Nuclear Information System (INIS)

    Colombo, P.; Godina, G.; Manganelli, R.

    2001-01-01

    In Italy the liberalization process of energy market is giving particular importance to the optimization of power plants performances; especially for those that will be called to satisfy grid peak demands. On those plants some techniques have been experimented for the reduction of minimum load; these techniques, investigated and tested by an engineering dynamic simulator, have been sequentially tested on plant. The minimum load for up 320 MW of Tavazzano power plants has been diminished from 140 down to 80 MW without plant modification [it

  16. VGB-requirements regarding technical data for power plants

    International Nuclear Information System (INIS)

    Richnow, Joerg

    2009-01-01

    Much of the technical plant data resulting from the planning, construction and start-up of power plants is needed for subsequent management and maintenance. Because of this, VGB has taken the initiative and has defined standard minimum requirements from power plant operators for technical plant data. They relate to the details and structure of this data, the definition of material classes and characteristics for the main power plant components and IT implementation for delivery of the technical plant data. (orig.)

  17. Ecologically justified regulatory provisions for riverine hydroelectric power plants and minimum instream flow requirements in diverted streams; Oekologisch begruendete, dynamische Mindestwasserregelungen bei Ausleitungskraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Jorde, K.

    1997-12-31

    The study was intended to develop a model versatile enough to permit quantification of various water demand scenarios in connection with operation of riverine hydroelectric power plants. Specific emphasis was to be placed on defining the minimum instream flow to be maintained in river segments because of the elementary significance to flowing water biocinoses. Based on fictitious minimum water requirements, various scenarious were simulated for flow regimes depending on power plant operation, so as to establish a system for comparative analysis and evaluation of resulting economic effects on power plant efficiency on the one hand, and the ecologic effects on the aquatic habitat. The information derived was to serve as a basis for decision-making for regulatory purposes. For this study, the temporal and spatial variability of the flow regime at the river bed in a river segment was examined for the first time. Based on this information, complemented by information obtained from habitat simulations, a method was derived for determination of ecologic requirements and their incorporation into regulatory water management provisions. The field measurements were carried out with the FST hemisphere as a proven and most efficient and reliable method of assessing flow regimes at river beds. Evaluation of the measured instream flow data characterising three morphologically different segments of diverted rivers was done with the CASIMIR computer code. The ASS models derived were used for comparative assessment of existing regulatory provisions and recommended amendments determining required minimum instream flow in diverted rivers. The requirements were defined taking as a basis data obtained for three different years. (orig./CB) [Deutsch] Ziel der Arbeit war die Entwicklung eines Modellverfahrens, das flexibel die Quantifizierung unterschiedlicher Nutzansprueche an Laufwasserkraftanlagen ermoeglicht. Insbesondere der Erhalt einer gewissen Dynamik, die fuer

  18. Ecologically justified regulatory provisions for riverine hydroelectric power plants and minimum instream flow requirements in diverted streams; Oekologisch begruendete, dynamische Mindestwasserregelungen bei Ausleitungskraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Jorde, K

    1998-12-31

    The study was intended to develop a model versatile enough to permit quantification of various water demand scenarios in connection with operation of riverine hydroelectric power plants. Specific emphasis was to be placed on defining the minimum instream flow to be maintained in river segments because of the elementary significance to flowing water biocinoses. Based on fictitious minimum water requirements, various scenarious were simulated for flow regimes depending on power plant operation, so as to establish a system for comparative analysis and evaluation of resulting economic effects on power plant efficiency on the one hand, and the ecologic effects on the aquatic habitat. The information derived was to serve as a basis for decision-making for regulatory purposes. For this study, the temporal and spatial variability of the flow regime at the river bed in a river segment was examined for the first time. Based on this information, complemented by information obtained from habitat simulations, a method was derived for determination of ecologic requirements and their incorporation into regulatory water management provisions. The field measurements were carried out with the FST hemisphere as a proven and most efficient and reliable method of assessing flow regimes at river beds. Evaluation of the measured instream flow data characterising three morphologically different segments of diverted rivers was done with the CASIMIR computer code. The ASS models derived were used for comparative assessment of existing regulatory provisions and recommended amendments determining required minimum instream flow in diverted rivers. The requirements were defined taking as a basis data obtained for three different years. (orig./CB) [Deutsch] Ziel der Arbeit war die Entwicklung eines Modellverfahrens, das flexibel die Quantifizierung unterschiedlicher Nutzansprueche an Laufwasserkraftanlagen ermoeglicht. Insbesondere der Erhalt einer gewissen Dynamik, die fuer

  19. 30 CFR 77.1706 - First aid training program; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First aid training program; minimum... OF UNDERGROUND COAL MINES Miscellaneous § 77.1706 First aid training program; minimum requirements. (a) All first aid training programs required under the provisions of §§ 77.1703 and 77.1704 shall...

  20. 13 CFR 108.210 - Minimum capital requirements for NMVC Companies.

    Science.gov (United States)

    2010-01-01

    ... NEW MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM Qualifications for the NMVC Program Capitalizing A Nmvc Company § 108.210 Minimum capital requirements for NMVC Companies. You must have Regulatory Capital of at... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Minimum capital requirements for...

  1. 42 CFR 84.145 - Motor-operated blower test; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Motor-operated blower test; minimum requirements... Supplied-Air Respirators § 84.145 Motor-operated blower test; minimum requirements. (a) Motor-operated... connection between the motor and the blower shall be so constructed that the motor may be disengaged from the...

  2. 29 CFR 783.26 - The section 6(b)(2) minimum wage requirement.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false The section 6(b)(2) minimum wage requirement. 783.26... The section 6(b)(2) minimum wage requirement. Section 6(b), with paragraph (2) thereof, requires the... prescribed by” paragraph (1) of the subsection is the minimum wage rate applicable according to the schedule...

  3. 7 CFR 33.10 - Minimum requirements.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing... ISSUED UNDER AUTHORITY OF THE EXPORT APPLE ACT Regulations § 33.10 Minimum requirements. No person shall... shipment of apples to any foreign destination unless: (a) Apples grade at least U.S. No. 1 or U.S. No. 1...

  4. 30 CFR 18.97 - Inspection of machines; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Inspection of machines; minimum requirements... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.97 Inspection of machines; minimum...

  5. The minimum work required for air conditioning process

    International Nuclear Information System (INIS)

    Alhazmy, Majed M.

    2006-01-01

    This paper presents a theoretical analysis based on the second law of thermodynamics to estimate the minimum work required for the air conditioning process. The air conditioning process for hot and humid climates involves reducing air temperature and humidity. In the present analysis the inlet state is the state of the environment which has also been chosen as the dead state. The final state is the human thermal comfort fixed at 20 o C dry bulb temperature and 60% relative humidity. The general air conditioning process is represented by an equivalent path consisting of an isothermal dehumidification followed by a sensible cooling. An exergy analysis is performed on each process separately. Dehumidification is analyzed as a separation process of an ideal mixture of air and water vapor. The variations of the minimum work required for the air conditioning process with the ambient conditions is estimated and the ratio of the work needed for dehumidification to the total work needed to perform the entire process is presented. The effect of small variations in the final conditions on the minimum required work is evaluated. Tolerating a warmer or more humid final condition can be an easy solution to reduce the energy consumptions during critical load periods

  6. 42 CFR 86.31 - Eligibility; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Eligibility; minimum requirements. 86.31 Section 86.31 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES GRANTS FOR EDUCATION PROGRAMS IN OCCUPATIONAL SAFETY AND HEALTH Occupational Safety and Health Direct...

  7. Analysis of transport logistics and routing requirements for radioactive waste management systems with respect to a minimum power scenario

    International Nuclear Information System (INIS)

    James, I.A.

    1984-10-01

    This report assesses the transport logistics associated with disposal of intermediate-level radioactive waste, as generated by CEGB, SSEB, UKAEA and BNFL, in accordance with a 'Minimum Power Scenario'. Transport by road and rail is analysed, as in previous reports; use of coastal shipping however has not been included but has been replaced with a combined road/rail option. (author)

  8. 76 FR 23208 - Alternative to Minimum Days Off Requirements

    Science.gov (United States)

    2011-04-26

    ... Language X. Voluntary Consensus Standards XI. Finding of No Significant Environmental Impact XII. Paperwork... the Current Fitness for Duty Requirements On September 3, 2010, the Nuclear Energy Institute (NEI... to the minimum days off requirements considered the collective advantages and disadvantages of having...

  9. 30 CFR 77.1707 - First aid equipment; location; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First aid equipment; location; minimum... OF UNDERGROUND COAL MINES Miscellaneous § 77.1707 First aid equipment; location; minimum requirements. (a) Each operator of a surface coal mine shall maintain a supply of the first aid equipment set forth...

  10. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  11. 77 FR 5454 - Modifications to Minimum Present Value Requirements for Partial Annuity Distribution Options...

    Science.gov (United States)

    2012-02-03

    ... Modifications to Minimum Present Value Requirements for Partial Annuity Distribution Options Under Defined... guidance relating to the minimum present value requirements applicable to certain defined benefit pension plans. These proposed regulations would change the regulations regarding the minimum present value...

  12. New requirements on safety of nuclear power plants according to the IAEA safety standards

    International Nuclear Information System (INIS)

    Misak, J.

    2005-01-01

    In this presentation author presents new requirements on safety of nuclear power plants according to the IAEA safety standards. It is concluded that: - New set of IAEA Safety Standards is close to completion: around 40 standards for NPPs; - Different interpretation of IAEA Safety Standards at present: best world practices instead of previous 'minimum common denominator'; - A number of safety improvements required for NPPs; - Requirements related to BDBAs and severe accidents are the most demanding due to degradation of barriers: hardware modifications and accident management; - Large variety between countries in implementation of accident management programmes: from minimum to major hardware modifications; -Distinction between existing and new NPPs is essential from the point of view of the requirements; WWER 440 reactors have potential to reflect IAEA Safety Standards for existing NPPs; relatively low reactor power offers broader possibilities

  13. 30 CFR 77.804 - High-voltage trailing cables; minimum design requirements.

    Science.gov (United States)

    2010-07-01

    ... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.804 High-voltage trailing cables; minimum design requirements. (a) High-voltage trailing cables used in resistance grounded systems shall be... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High-voltage trailing cables; minimum design...

  14. 30 CFR 75.1713-6 - First-aid training program; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First-aid training program; minimum... § 75.1713-6 First-aid training program; minimum requirements. (a) All first-aid training programs... course of instruction similar to that outlined in “First Aid, A Bureau of Mines Instruction Manual.” (b...

  15. Day-ahead optimal dispatch for wind integrated power system considering zonal reserve requirements

    International Nuclear Information System (INIS)

    Liu, Fan; Bie, Zhaohong; Liu, Shiyu; Ding, Tao

    2017-01-01

    Highlights: • Analyzing zonal reserve requirements for wind integrated power system. • Modeling day-ahead optimal dispatch solved by chance constrained programming theory. • Determining optimal zonal reserve demand with minimum confidence interval. • Analyzing numerical results on test and large-scale real-life power systems. - Abstract: Large-scale integration of renewable power presents a great challenge for day-ahead dispatch to manage renewable resources while provide available reserve for system security. Considering zonal reserve is an effective way to ensure reserve deliverability when network congested, a random day-ahead dispatch optimization of wind integrated power system for a least operational cost is modeled including zonal reserve requirements and N − 1 security constraints. The random model is transformed into a deterministic one based on the theory of chance constrained programming and a determination method of optimal zonal reserve demand is proposed using the minimum confidence interval. After solving the deterministic model, the stochastic simulation is conducted to verify the validity of solution. Numerical tests and results on the IEEE 39 bus system and a large-scale real-life power system demonstrate the optimal day-ahead dispatch scheme is available and the proposed method is effective for improving reserve deliverability and reducing load shedding after large-capacity power outage.

  16. 30 CFR 75.1713-7 - First-aid equipment; location; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First-aid equipment; location; minimum... § 75.1713-7 First-aid equipment; location; minimum requirements. (a) Each operator of an underground coal mine shall maintain a supply of the first-aid equipment set forth in paragraph (b) of this § 75...

  17. Minimum short-circuit ratios for grid interconnection of wind farms with induction generators

    Energy Technology Data Exchange (ETDEWEB)

    Reginatto, Romeu; Rocha, Carlos [Western Parana State University (UNIOESTE), Foz do Iguacu, PR (Brazil). Center for Engineering and Exact Sciences], Emails: romeu@unioeste.br, croberto@unioeste.br

    2009-07-01

    This paper concerns the problem of determining the minimum value for the short-circuit ratio which is adequate for the interconnection of a given wind farms to a given grid point. First, a set of 3 criteria is defined in order to characterize the quality/safety of the interconnection: acceptable terminal voltage variations, a minimum active power margin, and an acceptable range for the internal voltage angle. Then, the minimum short circuit ratio requirement is determined for 6 different induction generator based wind turbines, both fixed-speed (with and without reactive power compensation) and variable-speed (with the following control policies: reactive power, power factor, and terminal voltage regulation). The minimum short-circuit ratio is determined and shown in graphical results for the 6 wind turbines considered, for X/R in the range 0-15, also analyzing the effect of more/less stringent tolerances for the interconnection criteria. It is observed that the tighter the tolerances the larger the minimum short-circuit ratio required. For the same tolerances in the interconnection criteria, a comparison of the minimum short circuit ratio required for the interconnection of both squirrel-cage and doubly-fed induction generators is presented, showing that the last requires much smaller values for the short-circuit ratio. (author)

  18. Finding Minimum-Power Broadcast Trees for Wireless Networks

    Science.gov (United States)

    Arabshahi, Payman; Gray, Andrew; Das, Arindam; El-Sharkawi, Mohamed; Marks, Robert, II

    2004-01-01

    Some algorithms have been devised for use in a method of constructing tree graphs that represent connections among the nodes of a wireless communication network. These algorithms provide for determining the viability of any given candidate connection tree and for generating an initial set of viable trees that can be used in any of a variety of search algorithms (e.g., a genetic algorithm) to find a tree that enables the network to broadcast from a source node to all other nodes while consuming the minimum amount of total power. The method yields solutions better than those of a prior algorithm known as the broadcast incremental power algorithm, albeit at a slightly greater computational cost.

  19. 77 FR 14321 - Modifications to Minimum Present Value Requirements for Partial Annuity Distribution Options...

    Science.gov (United States)

    2012-03-09

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service 26 CFR Part 1 [REG-110980-10] RIN 1545-BJ55 Modifications to Minimum Present Value Requirements for Partial Annuity Distribution Options Under Defined... FR 5454), providing guidance relating to the minimum present value requirements applicable to certain...

  20. Normalized Minimum Error Entropy Algorithm with Recursive Power Estimation

    Directory of Open Access Journals (Sweden)

    Namyong Kim

    2016-06-01

    Full Text Available The minimum error entropy (MEE algorithm is known to be superior in signal processing applications under impulsive noise. In this paper, based on the analysis of behavior of the optimum weight and the properties of robustness against impulsive noise, a normalized version of the MEE algorithm is proposed. The step size of the MEE algorithm is normalized with the power of input entropy that is estimated recursively for reducing its computational complexity. The proposed algorithm yields lower minimum MSE (mean squared error and faster convergence speed simultaneously than the original MEE algorithm does in the equalization simulation. On the condition of the same convergence speed, its performance enhancement in steady state MSE is above 3 dB.

  1. 49 CFR 236.0 - Applicability, minimum requirements, and penalties.

    Science.gov (United States)

    2010-10-01

    ... persons, or has caused death or injury, a penalty not to exceed $100,000 per violation may be assessed... state law seeking damages for personal injury, death, or property damage alleging that a party has... 49 Transportation 4 2010-10-01 2010-10-01 false Applicability, minimum requirements, and penalties...

  2. 42 CFR 403.304 - Minimum requirements for State systems-discretionary approval.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Minimum requirements for State systems..., DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Recognition of State... the system meets the requirements in paragraphs (b) and (c) of this section and, if applicable...

  3. 78 FR 2797 - Federal Motor Vehicle Safety Standards; Minimum Sound Requirements for Hybrid and Electric Vehicles

    Science.gov (United States)

    2013-01-14

    ... Sound Requirements for Hybrid and Electric Vehicles; Draft Environmental Assessment for Rulemaking To Establish Minimum Sound Requirements for Hybrid and Electric Vehicles; Proposed Rules #0;#0;Federal Register...-0148] RIN 2127-AK93 Federal Motor Vehicle Safety Standards; Minimum Sound Requirements for Hybrid and...

  4. Potential minimum cost of electricity of superconducting coil tokamak power reactors

    International Nuclear Information System (INIS)

    Reid, R.L.; Peng, Y-K. M.

    1989-01-01

    The potential minimum cost of electricity (COE) for superconducting tokamak power reactors is estimated by increasing the physics (confinement, beta limit, bootstrap current fraction) and technology [neutral beam energy, toroidal field (TF) coil allowable stresses, divertor heat flux, superconducting coil critical field, critical temperature, and quench temperature rise] constraints far beyond those assumed for ITER until the point of diminishing returns is reached. A version of the TETRA systems code, calibrated with the ITER design and modified for power reactors, is used for this analysis, limiting this study to reactors with the same basic device configuration and costing algorithms as ITER. A minimum COE is reduced from >200 to about 80 mill/kWh when the allowable design constraints are raised to 2 times those of ITER. At 4 times the ITER allowables, a minimum COE of about 60 mill/kWh is obtained. The corresponding tokamak has a major radius of approximately 4 m, a plasma current close to 10 MA, an aspect ratio of 4, a confinement H- factor ≤3, a beta limit of approximately 2 times the first stability regime, a divertor heat flux of about 20 MW/m 2 , a Β max ≤ 18 T, and a TF coil average current density about 3 times that of ITER. The design constraints that bound the minimum COE are the allowable stresses in the TF coil, the neutral beam energy, and the 99% bootstrap current (essentially free current drive). 14 refs., 4 figs., 2 tabs

  5. Minimum mass of moderator required for criticality of homogeneous low-enriched uranium systems

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, W.C.; Turner, J.C.

    1992-12-01

    A parametric calculational analysis has been performed in order to estimate the minimum mass of moderator required for criticality of homogeneous low-enriched uranium systems. The analysis was performed using a version of the SCALE-4.0 code system and the 27-group ENDF/B-IV cross-section library. Water-moderated uranyl fluoride (UO{sub 2}F{sub 2} and H{sub 2}O) and hydrofluoric-acid-moderated uranium hexaflouride (UF{sub 6} and HF) systems were considered in the analysis over enrichments of 1.4 to 5 wt % {sup 235}U. Estimates of the minimum critical volume, minimum critical mass of uranium, and the minimum mass of moderator required for criticality are presented. There was significant disagreement between the values generated in this study when compared with a similar undocumented study performed in 1983 using ANISN and the Knight-modified Hansen-Roach cross sections. An investigation into the cause of the disagreement was made, and the results are presented.

  6. Minimum mass of moderator required for criticality of homogeneous low-enriched uranium systems

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, W.C.; Turner, J.C.

    1992-12-01

    A parametric calculational analysis has been performed in order to estimate the minimum mass of moderator required for criticality of homogeneous low-enriched uranium systems. The analysis was performed using a version of the SCALE-4.0 code system and the 27-group ENDF/B-IV cross-section library. Water-moderated uranyl fluoride (UO[sub 2]F[sub 2] and H[sub 2]O) and hydrofluoric-acid-moderated uranium hexaflouride (UF[sub 6] and HF) systems were considered in the analysis over enrichments of 1.4 to 5 wt % [sup 235]U. Estimates of the minimum critical volume, minimum critical mass of uranium, and the minimum mass of moderator required for criticality are presented. There was significant disagreement between the values generated in this study when compared with a similar undocumented study performed in 1983 using ANISN and the Knight-modified Hansen-Roach cross sections. An investigation into the cause of the disagreement was made, and the results are presented.

  7. 30 CFR 77.506-1 - Electric equipment and circuits; overload and short circuit protection; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... short circuit protection; minimum requirements. 77.506-1 Section 77.506-1 Mineral Resources MINE SAFETY...-1 Electric equipment and circuits; overload and short circuit protection; minimum requirements. Devices providing either short circuit protection or protection against overload shall conform to the...

  8. The Vital Minimum Amount of Drinking Water Required in Ecuador

    Directory of Open Access Journals (Sweden)

    Andrés Martínez Moscoso

    2018-02-01

    Full Text Available In 2017, the government of Ecuador established the minimum quantity of water required to be provided for free by drinking water utilities. Ecuador recognized the access to water as a fundamental human right because it guarantees the good living, known as “Sumak kawsay”, an indigenous Andean concept, in the Ecuadorian Constitution. This represents a novel approach to water rights in the world, as it is the first attempt to establish a minimum quantity of water under a constitutional guarantee by legislation, rather than regulation or judicial decision. However, this novel legislative approach raises the question of how this minimum amount of free water will impact the most vulnerable members of the Ecuadorian community. This paper provides the results of the first comprehensive research of the minimum required water provision in Ecuador. In order to measure the impact on the income of households, we built a methodology integrating: doctrinaire analyses, normative studies, and economic analyses. According to the Ecuadorian legislation, over-consumption of raw water generates additional costs that must be paid by water companies to the central government. In that regard, there is an inevitable relationship between the efficiency of the service and those additional costs. Efficiency, on this case, is the capacity of water companies (public or private to provide water services at an adequate price, observing the following parameters: quantity, quality and sufficiency. Our research found that with this legislation in three Ecuadorian local governments (Cuenca, Gualaceo and Suscal, the most vulnerable households (i.e., low-income and/or indigenous households will be affected the most. This means that and those families will spend the most part of their income on water services otherwise they would have to reduce their water consumption.

  9. 42 CFR 84.156 - Airflow resistance test; Type C supplied-air respirator, demand class; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... C supplied-air respirator, demand class; minimum requirements. (a) Inhalation resistance shall not... 42 Public Health 1 2010-10-01 2010-10-01 false Airflow resistance test; Type C supplied-air respirator, demand class; minimum requirements. 84.156 Section 84.156 Public Health PUBLIC HEALTH SERVICE...

  10. 30 CFR 75.518-1 - Electric equipment and circuits; overload and short circuit protection; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric equipment and circuits; overload and short circuit protection; minimum requirements. 75.518-1 Section 75.518-1 Mineral Resources MINE SAFETY... short circuit protection; minimum requirements. A device to provide either short circuit protection or...

  11. Effect of power system technology and mission requirements on high altitude long endurance aircraft

    Science.gov (United States)

    Colozza, Anthony J.

    1994-01-01

    An analysis was performed to determine how various power system components and mission requirements affect the sizing of a solar powered long endurance aircraft. The aircraft power system consists of photovoltaic cells and a regenerative fuel cell. Various characteristics of these components, such as PV cell type, PV cell mass, PV cell efficiency, fuel cell efficiency, and fuel cell specific mass, were varied to determine what effect they had on the aircraft sizing for a given mission. Mission parameters, such as time of year, flight altitude, flight latitude, and payload mass and power, were also altered to determine how mission constraints affect the aircraft sizing. An aircraft analysis method which determines the aircraft configuration, aspect ratio, wing area, and total mass, for maximum endurance or minimum required power based on the stated power system and mission parameters is presented. The results indicate that, for the power system, the greatest benefit can be gained by increasing the fuel cell specific energy. Mission requirements also substantially affect the aircraft size. By limiting the time of year the aircraft is required to fly at high northern or southern latitudes, a significant reduction in aircraft size or increase in payload capacity can be achieved.

  12. Minimum weight passive insulation requirements for hypersonic cruise vehicles.

    Science.gov (United States)

    Ardema, M. D.

    1972-01-01

    Analytical solutions are derived for two representative cases of the transient heat conduction equation to determine the minimum weight requirements for passive insulation systems of hypersonic cruise vehicles. The cases discussed are the wet wall case with the interior wall temperature held to that of the boiling point of the fuel throughout the flight, and the dry wall case where the heat transferred through the insulation is absorbed by the interior structure whose temperature is allowed to rise.

  13. Determination of minimum sample size for fault diagnosis of automobile hydraulic brake system using power analysis

    Directory of Open Access Journals (Sweden)

    V. Indira

    2015-03-01

    Full Text Available Hydraulic brake in automobile engineering is considered to be one of the important components. Condition monitoring and fault diagnosis of such a component is very essential for safety of passengers, vehicles and to minimize the unexpected maintenance time. Vibration based machine learning approach for condition monitoring of hydraulic brake system is gaining momentum. Training and testing the classifier are two important activities in the process of feature classification. This study proposes a systematic statistical method called power analysis to find the minimum number of samples required to train the classifier with statistical stability so as to get good classification accuracy. Descriptive statistical features have been used and the more contributing features have been selected by using C4.5 decision tree algorithm. The results of power analysis have also been verified using a decision tree algorithm namely, C4.5.

  14. An asymptotically unbiased minimum density power divergence estimator for the Pareto-tail index

    DEFF Research Database (Denmark)

    Dierckx, Goedele; Goegebeur, Yuri; Guillou, Armelle

    2013-01-01

    We introduce a robust and asymptotically unbiased estimator for the tail index of Pareto-type distributions. The estimator is obtained by fitting the extended Pareto distribution to the relative excesses over a high threshold with the minimum density power divergence criterion. Consistency...

  15. Energy and environmental norms on Minimum Vital Flux

    International Nuclear Information System (INIS)

    Maran, S.

    2008-01-01

    By the end of the year will come into force the recommendations on Minimum Vital flow and operators of hydroelectric power plants will be required to make available part of water of their derivations in order to protect river ecosystems. In this article the major energy and environmental consequences of these rules, we report some quantitative evaluations and are discusses the proposals for overcoming the weaknesses of the approach in the estimation of Minimum Vital Flux [it

  16. Overview of systems requirements for impact fusion power

    International Nuclear Information System (INIS)

    Williams, J.M.; Booth, L.A.; Krakowski, R.A.

    1979-01-01

    The development of impact fusion power reactor concepts is very limited at this time. Key systems factors in arriving at practical concepts will be conception of credible systems and subsystems which promise an acceptable overall energy balance and development of target/projectile designs and gain versus projectile energy curves which allow system design tradeoffs to be accomplished. Important system parameters will be subsystem efficiencies (particularly the accelerator), target/projectile gain as a function of target design, circulating power fraction or engineering gain, system pulse repetition rate, size/cost scaling of components, containment cavity design limits, maximum yield, minimum economical yield, minimum projectile velocity and energy, and overall economics. When more detailed conceptual designs are available, then system tradeoffs and performance optimization will be possible

  17. 5 CFR 532.205 - The use of Federal, State, and local minimum wage requirements in determining prevailing rates.

    Science.gov (United States)

    2010-01-01

    ... minimum wage requirements in determining prevailing rates. 532.205 Section 532.205 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PREVAILING RATE SYSTEMS Prevailing Rate Determinations § 532.205 The use of Federal, State, and local minimum wage requirements in determining prevailing...

  18. Minimum Stocking Requirements for Retailers in the Special Supplemental Nutrition Program for Women, Infants, and Children: Disparities Across US States.

    Science.gov (United States)

    Pelletier, Jennifer E; Schreiber, Liana R N; Laska, Melissa N

    2017-07-01

    To examine state variation in minimum stocking requirements for Special Supplemental Nutrition Program for Women, Infants, and Children (WIC)-authorized small food retailers. We obtained minimum stocking requirements for 50 states and the District of Columbia in 2017 from WIC Web pages or e-mail from the state WIC agency. We developed a coding protocol to compare minimum quantities and varieties required for 12 food and beverage categories. We calculated the median, range, and interquartile range for each measure. Nearly all states set minimum varieties and quantities of fruits and vegetables, 100% juice, whole grain-rich foods, breakfast cereal, milk, cheese, eggs, legumes, and peanut butter. Fewer states set requirements for canned fish, yogurt, and tofu. Most measures had a large range in minimum requirements (e.g., $8-$100 of fruits and vegetables, 60-144 oz of breakfast cereal). WIC-participating retailers must adhere to very different minimum stocking requirements across states, which may result in disparities in food and beverage products available to WIC recipients. Public Health Implications. The results provide benchmarks that can inform new local, state, and federal program and policy efforts to increase healthy food availability in retail settings.

  19. [Storage of plant protection products in farms: minimum safety requirements].

    Science.gov (United States)

    Dutto, Moreno; Alfonzo, Santo; Rubbiani, Maristella

    2012-01-01

    Failure to comply with requirements for proper storage and use of pesticides in farms can be extremely hazardous and the risk of accidents involving farm workers, other persons and even animals is high. There are still wide differences in the interpretation of the concept of "securing or making safe", by workers in this sector. One of the critical points detected, particularly in the fruit sector, is the establishment of an adequate storage site for plant protection products. The definition of "safe storage of pesticides" is still unclear despite the recent enactment of Legislative Decree 81/2008 regulating health and work safety in Italy. In addition, there are no national guidelines setting clear minimum criteria for storage of plant protection products in farms. The authors, on the basis of their professional experience and through analysis of recent legislation, establish certain minimum safety standards for storage of pesticides in farms.

  20. Minimum resolvable power contrast model

    Science.gov (United States)

    Qian, Shuai; Wang, Xia; Zhou, Jingjing

    2018-01-01

    Signal-to-noise ratio and MTF are important indexs to evaluate the performance of optical systems. However,whether they are used alone or joint assessment cannot intuitively describe the overall performance of the system. Therefore, an index is proposed to reflect the comprehensive system performance-Minimum Resolvable Radiation Performance Contrast (MRP) model. MRP is an evaluation model without human eyes. It starts from the radiance of the target and the background, transforms the target and background into the equivalent strips,and considers attenuation of the atmosphere, the optical imaging system, and the detector. Combining with the signal-to-noise ratio and the MTF, the Minimum Resolvable Radiation Performance Contrast is obtained. Finally the detection probability model of MRP is given.

  1. 78 FR 2868 - Draft Environmental Assessment for Rulemaking To Establish Minimum Sound Requirements for Hybrid...

    Science.gov (United States)

    2013-01-14

    ... require hybrid and electric passenger cars, light trucks, medium and heavy duty trucks and buses, low... Sound Requirements for Hybrid and Electric Vehicles AGENCY: National Highway Traffic Safety... minimum sound requirements for hybrid and electric vehicles. DATES: Comments must be received on or before...

  2. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  3. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  4. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  5. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  6. 29 CFR 516.11 - Employees exempt from both minimum wage and overtime pay requirements under section 13(a) (2), (3...

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Employees exempt from both minimum wage and overtime pay... Exemptions Under the Act; Other Special Requirements § 516.11 Employees exempt from both minimum wage and.... With respect to each and every employee exempt from both the minimum wage and overtime pay requirements...

  7. 47 CFR 73.211 - Power and antenna height requirements.

    Science.gov (United States)

    2010-10-01

    ... must operate with a minimum effective radiated power (ERP) as follows: (i) The minimum ERP for Class A stations is 0.1 kW. (ii) The ERP for Class B1 stations must exceed 6 kW. (iii) The ERP for Class B stations must exceed 25 kW. (iv) The ERP for Class C3 stations must exceed 6 kW. (v) The ERP for Class C2...

  8. The power of reordering for online minimum makespan scheduling

    OpenAIRE

    Englert, Matthias; Özmen, Deniz; Westermann, Matthias

    2014-01-01

    In the classic minimum makespan scheduling problem, we are given an input sequence of jobs with processing times. A scheduling algorithm has to assign the jobs to m parallel machines. The objective is to minimize the makespan, which is the time it takes until all jobs are processed. In this paper, we consider online scheduling algorithms without preemption. However, we do not require that each arriving job has to be assigned immediately to one of the machines. A reordering buffer with limited...

  9. Minimum training requirement in ultrasound imaging of peripheral arterial disease.

    Science.gov (United States)

    Eiberg, J P; Hansen, M A; Grønvall Rasmussen, J B; Schroeder, T V

    2008-09-01

    To demonstrate the minimum training requirement when performing ultrasound of peripheral arterial disease. Prospective and blinded comparative study. 100 limbs in 100 consecutive patients suffering from peripheral arterial disease, 74% suffering critical limb ischemia, were enrolled during a 9 months period. One physician with limited ultrasound experience performed all the ultrasound examinations of the arteries of the most symptomatic limb. Before enrolling any patients 15 duplex ultrasound examinations were performed supervised by an experienced vascular technologist. All patients had a digital subtraction arteriography performed by an experienced vascular radiologist, unaware of the ultrasound result. The number of insufficiently insonated segments (non-diagnostic segments) was significantly reduced during the study; from 9% among the initial 50 limbs to 2% among the last 50 limbs (Pultrasound and arteriography from the initial 50 patients (overall Kappa=0.66, (95%-CI: 0.60-0.72); supragenicular Kappa=0.73 (95%-CI: 0.64-0.82); infragenicular Kappa=0.61 (95%-CI: 0.54-0.69)) to the last 50 patients (overall Kappa=0.66 (95%-CI: 0.60-0.72), supragenicular Kappa=0.67 (95%-CI: 0.57-0.76); infragenicular Kappa=0.66 (95%-CI: 0.58-0.73)). The minimum training requirement in ultrasound imaging of peripheral arterial disease appears to be less than 50 ultrasound examinations (probably only 15 examinations) for the supragenicular segments and 100 examinations for the infragenicular segments.

  10. Analysis of power ramp rate and minimum power controllability of the MMS model for a plant dynamics analysis of a Prototype SFR

    International Nuclear Information System (INIS)

    Kim, Eui Kwang; Kim, Dehee; Joo, Hyungkook; Lee, Taeho

    2014-01-01

    A full plant dynamic model was developed for a prototype SFR using the Modular Modeling System (MMS). It includes the modeling of various subsystems such as the neutronics, primary and intermediate sodium systems of the NSSS, steam and water systems of the BOP, BOP controls, and the supervisory plant controls. The NSSS model is subdivided into component models, such as a Core, IHXs, Pumps, SGs, and the rest of the NSSS loop model. The BOP model is subdivided into a steam subsystem, feedwater subsystem, and preheater subsystem. Plant transient tests were performed to study the operational considerations. It includes varying the power ramp rate and studying the controllability at minimum power. Plant transient tests were performed to study operational considerations by using the MMS model for a prototype SFR. It includes varying the power ramp rate, studying the controllability at the minimum power set point. At a power ramp rate of higher than 2%, the steam temperature has a large deviation from the target. As the power set point decreases, the PHTS hot leg temperature and steam temperature tend to have higher deviations. After further refinement of the MMS model, it can be useful for developing the plant operation logics of the prototype SFR

  11. 75 FR 6151 - Minimum Capital

    Science.gov (United States)

    2010-02-08

    ... capital and reserve requirements to be issued by order or regulation with respect to a product or activity... minimum capital requirements. Section 1362(a) establishes a minimum capital level for the Enterprises... entities required under this section.\\6\\ \\3\\ The Bank Act's current minimum capital requirements apply to...

  12. Military power requirements and backup power considerations

    International Nuclear Information System (INIS)

    Botts, T.E.

    1986-01-01

    All US Air Force (USAF) facilities have certain critical power requirements that must be met in order to carry out their mission successfully. Internal USAF studies have shown that the mission can degrade precipitously as the available power decreases below the mission critical level. Now, more than ever before, the military and private industry are finding that certain functions, such as automated data processing and automated process control, respond catastrophically to power reductions. Furthermore, increased reliance on electrical power means, in the case of the Air Force, that critical power requirements are anticipated to increase by half over the next 15 yr. For these reasons and others, the USAF is investigating several means of improving the availability of electric power under adverse conditions above that which can be provided by an off-base supplier. Among the approaches to this problem being pursued at this time are a program to improve all sorts of generator sets on a service-wide basis and the Multimegawatt Terrestrial Power (MTP) Program, which is pursuing the design and testing of a small dedicated nuclear power source to provide critical mission power. The purpose of this paper is to provide some insight into some of the issues associated with USAF power programs

  13. A minimum attention control center for nuclear power plants

    International Nuclear Information System (INIS)

    Meijer, C.H.

    1986-01-01

    Control Centers for Nuclear Power Plants have characteristically been designed for maximum attention by the operating staffs of these plants. Consequently, the monitoring, control and diagnostics oriented cognitive activities by these staffs, were mostly ''data-driven'' in nature. This paper addresses a control center concept, under development by Combustion Engineering, that promotes a more ''information-driven'' cognitive interaction process between the operator and the plant. The more ''intelligent'' and therefore less attentive nature of such interactive process utilizes computer implemented cognitive engineered algorithms. The underlying structure of these algorithms is based upon the Critical Function/Success Path monitoring principle. The paper highlights a typical implementation of the minimum attention concept for the handling of unfamiliar safety related events. (author)

  14. Analysis of power and frequency control requirements in view of increased decentralized production and market liberalization

    International Nuclear Information System (INIS)

    Roffel, B.; Boer, W.W. de

    2003-01-01

    This paper presents a systematic approach of the analysis of the minimum control requirements that are imposed on power producing units in the Netherlands, especially in the case when decentralized production increases. Also some effects of the liberalization on the control behavior are analyzed. First an overview is given of the amount and type of power production in the Netherlands, followed by a review of the control requirements. Next models are described, including a simplified model for the UCTE power system. The model was tested against frequency and power measurements after failure of a 558 MW production unit in the Netherlands. Agreement between measurements and model predictions proved to be good. The model was subsequently used to analyze the primary and secondary control requirements and the impact of an increase in decentralized power production on the fault restoration capabilities of the power system. Since the latter production units are not actively participating in primary and secondary control, fault restoration takes longer and becomes unacceptable when only 35% of the power producing units participate in secondary control. Finally, the model was used to study the impact of deregulation, especially the effect of 'block scheduling', on additional control actions of the secondary control. (Author)

  15. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  16. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  17. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  18. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  19. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  20. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  1. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  2. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  3. 42 CFR 84.75 - Half-mask facepieces, full facepieces, mouthpieces; fit; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Half-mask facepieces, full facepieces, mouthpieces... RESPIRATORY PROTECTIVE DEVICES Self-Contained Breathing Apparatus § 84.75 Half-mask facepieces, full facepieces, mouthpieces; fit; minimum requirements. (a) Half-mask facepieces and full facepieces shall be...

  4. 29 CFR 520.200 - What is the legal authority for payment of wages lower than the minimum wage required by section...

    Science.gov (United States)

    2010-07-01

    ... the minimum wage required by section 6(a) of the Fair Labor Standards Act? 520.200 Section 520.200... lower than the minimum wage required by section 6(a) of the Fair Labor Standards Act? Section 14(a) of..., for the payment of special minimum wage rates to workers employed as messengers, learners (including...

  5. Bounds on Minimum Energy per Bit for Optical Wireless Relay Channels

    Directory of Open Access Journals (Sweden)

    A. D. Raza

    2014-09-01

    Full Text Available An optical wireless relay channel (OWRC is the classical three node network consisting of source, re- lay and destination nodes with optical wireless connectivity. The channel law is assumed Gaussian. This paper studies the bounds on minimum energy per bit required for reliable communication over an OWRC. It is shown that capacity of an OWRC is concave and energy per bit is monotonically increasing in square of the peak optical signal power, and consequently the minimum energy per bit is inversely pro- portional to the square root of asymptotic capacity at low signal to noise ratio. This has been used to develop upper and lower bound on energy per bit as a function of peak signal power, mean to peak power ratio, and variance of channel noise. The upper and lower bounds on minimum energy per bit derived in this paper correspond respectively to the decode and forward lower bound and the min-max cut upper bound on OWRC capacity

  6. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  7. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  8. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  9. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  10. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  11. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  12. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  13. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  14. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  15. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  16. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  17. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  18. An Experimental study on a Method of Computing Minimum flow rate

    International Nuclear Information System (INIS)

    Cho, Yeon Sik; Kim, Tae Hyun; Kim, Chang Hyun

    2009-01-01

    Many pump reliability problems in the Nuclear Power Plants (NPPs) are being attributed to the operation of the pump at flow rates well below its best efficiency point(BEP). Generally, the manufacturer and the user try to avert such problems by specifying a minimum flow, below which the pump should not be operated. Pump minimum flow usually involves two considerations. The first consideration is normally termed the 'thermal minimum flow', which is that flow required to prevent the fluid inside the pump from reaching saturation conditions. The other consideration is often referred to as 'mechanical minimum flow', which is that flow required to prevent mechanical damage. However, the criteria for specifying such a minimum flow are not clearly understood by all parties concerned. Also various factor and information for computing minimum flow are not easily available as considering for the pump manufacturer' proprietary. The objective of this study is to obtain experimental data for computing minimum flow rate and to understand the pump performances due to low flow operation. A test loop consisted of the pump to be used in NPPs, water tank, flow rate measurements and piping system with flow control devices was established for this study

  19. Waterberg coal characteristics and SO2 minimum emissions standards in South African power plants.

    Science.gov (United States)

    Makgato, Stanford S; Chirwa, Evans M Nkhalambayausi

    2017-10-01

    Key characteristics of coal samples from the supply stock to the newly commissioned South African National Power Utility's (Eskom's) Medupi Power Station - which receives its supply coal from the Waterberg coalfield in Lephalale (Limpopo Province, South Africa) - were evaluated. Conventional coal characterisation such as proximate and ultimate analysis as well as determination of sulphur forms in coal samples were carried out following the ASTM and ISO standards. Coal was classified as medium sulphur coal when the sulphur content was detected in the range 1.15-1.49 wt.% with pyritic sulphur (≥0.51 wt.%) and organic sulphur (≥0.49 wt.%) accounted for the bulk of the total sulphur in coal. Maceral analyses of coal showed that vitrinite was the dominant maceral (up to 51.8 vol.%), whereas inertinite, liptinite, reactive semifusinite and visible minerals occurred in proportions of 22.6 vol.%, 2.9 vol.%, 5.3 vol.% and 17.5 vol.%, respectively. Theoretical calculations were developed and used to predict the resultant SO 2 emissions from the combustion of the Waterberg coal in a typical power plant. The sulphur content requirements to comply with the minimum emissions standards of 3500 mg/Nm 3 and 500 mg/Nm 3 were found to be ≤1.37 wt.% and ≤0.20 wt.%, respectively. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Minimum area requirements for an at-risk butterfly based on movement and demography.

    Science.gov (United States)

    Brown, Leone M; Crone, Elizabeth E

    2016-02-01

    Determining the minimum area required to sustain populations has a long history in theoretical and conservation biology. Correlative approaches are often used to estimate minimum area requirements (MARs) based on relationships between area and the population size required for persistence or between species' traits and distribution patterns across landscapes. Mechanistic approaches to estimating MAR facilitate prediction across space and time but are few. We used a mechanistic MAR model to determine the critical minimum patch size (CMP) for the Baltimore checkerspot butterfly (Euphydryas phaeton), a locally abundant species in decline along its southern range, and sister to several federally listed species. Our CMP is based on principles of diffusion, where individuals in smaller patches encounter edges and leave with higher probability than those in larger patches, potentially before reproducing. We estimated a CMP for the Baltimore checkerspot of 0.7-1.5 ha, in accordance with trait-based MAR estimates. The diffusion rate on which we based this CMP was broadly similar when estimated at the landscape scale (comparing flight path vs. capture-mark-recapture data), and the estimated population growth rate was consistent with observed site trends. Our mechanistic approach to estimating MAR is appropriate for species whose movement follows a correlated random walk and may be useful where landscape-scale distributions are difficult to assess, but demographic and movement data are obtainable from a single site or the literature. Just as simple estimates of lambda are often used to assess population viability, the principles of diffusion and CMP could provide a starting place for estimating MAR for conservation. © 2015 Society for Conservation Biology.

  1. 30 CFR 75.1107-7 - Water spray devices; capacity; water supply; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Water spray devices; capacity; water supply... Water spray devices; capacity; water supply; minimum requirements. (a) Where water spray devices are... square foot over the top surface area of the equipment and the supply of water shall be adequate to...

  2. 13 CFR 106.202 - What are the minimum requirements applicable to Cosponsored Activities?

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the minimum requirements applicable to Cosponsored Activities? 106.202 Section 106.202 Business Credit and Assistance SMALL BUSINESS... constitute or imply an endorsement by SBA of any Cosponsor or any Cosponsor's products or services; (c) Any...

  3. 78 FR 30782 - Avocados Grown in South Florida; Change in Minimum Grade Requirements

    Science.gov (United States)

    2013-05-23

    ..., regardless of market destination. However, maintaining the current minimum grade requirement for avocados... Service 7 CFR Part 915 [Doc. No. AMS-FV-12-0067; FV13-915-1 PR] Avocados Grown in South Florida; Change in... prescribed under the Florida avocado marketing order (order). The order regulates the handling of avocados...

  4. Is shade for horses a comfort resource or a minimum requirement?

    Science.gov (United States)

    Holcomb, K E

    2017-09-01

    Shade or shelter as protection from extremes of weather is required for horses at agricultural research and teaching facilities and is recommended or required by many states, professional organizations, and industry groups. The focus of this paper is the recent research on the responses of horses to hot, sunny weather, which has begun to provide scientific evidence that characterizes how and when shade is used and any benefits shade confers on horses. These behavioral and physiological findings support provision of shade as a resource for thermal comfort and the expression of normal behavior that should be included as a standard of best care practices for healthy adult horses living in the environmental conditions reviewed, rather than an absolute minimum care requirement. Additional research is required for horses living under other environmental conditions, for very young or old horses, horses in very poor body condition, or those with compromised health to determine if their responses to hot, sunny weather differ from those presented here.

  5. Design of intelligent comfort control system with human learning and minimum power control strategies

    International Nuclear Information System (INIS)

    Liang, J.; Du, R.

    2008-01-01

    This paper presents the design of an intelligent comfort control system by combining the human learning and minimum power control strategies for the heating, ventilating and air conditioning (HVAC) system. In the system, the predicted mean vote (PMV) is adopted as the control objective to improve indoor comfort level by considering six comfort related variables, whilst a direct neural network controller is designed to overcome the nonlinear feature of the PMV calculation for better performance. To achieve the highest comfort level for the specific user, a human learning strategy is designed to tune the user's comfort zone, and then, a VAV and minimum power control strategy is proposed to minimize the energy consumption further. In order to validate the system design, a series of computer simulations are performed based on a derived HVAC and thermal space model. The simulation results confirm the design of the intelligent comfort control system. In comparison to the conventional temperature controller, this system can provide a higher comfort level and better system performance, so it has great potential for HVAC applications in the future

  6. Minimum long-term cost solution for remote telecommunication stations on the basis of photovoltaic-based hybrid power systems

    International Nuclear Information System (INIS)

    Kaldellis, J.K.; Ninou, I.; Zafirakis, D.

    2011-01-01

    In the case of the telecommunication (T/C) services' expansion to rural and remote areas, the market generally responds with the minimum investments required. Considering the existing situation, cost-effective operation of the T/C infrastructure installed in these regions (i.e. remote T/C stations) becomes critical. However, since in most cases grid-connection is not feasible, the up-to-now electrification solution for remote T/C stations is based on the operation of costly, oil consuming and heavy polluting diesel engines. Instead, the use of photovoltaic (PV)-based hybrid power stations is currently examined, using as a case study a representative remote T/C station of the Greek territory. In this context, the present study is concentrated on the detailed cost-benefit analysis of the proposed solution. More precisely, the main part of the analysis is devoted to develop a complete electricity production cost model, accordingly applied for numerous oil consumption and service period scenarios. Note that in all cases examined, zero load rejections is a prerequisite while minimum long-term cost solutions designated are favorably compared with the diesel-only solution. Finally, a sensitivity analysis, demonstrating the impact of the main economic parameters on the energy production cost of optimum sized PV-diesel hybrid power stations, is also provided. - Research highlights: → Expansion of telecommunication (T/C) in remote areas is vital for their development. → Off-grid T/C stations employed in such areas operate on diesel engines. → The use of PV-diesel-battery hybrid power stations is currently examined. → A detailed long-term electricity production cost model is developed. → Cost-effectiveness of the proposed system is reflected for numerous configurations.

  7. IEEE standard requirements for reliability analysis in the design and operation of safety systems for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The purpose of this standard is to provide uniform, minimum acceptable requirements for the performance of reliability analyses for safety-related systems found in nuclear-power generating stations, but not to define the need for an analysis. The need for reliability analysis has been identified in other standards which expand the requirements of regulations (e.g., IEEE Std 379-1972 (ANSI N41.2-1972), ''Guide for the Application of the Single-Failure Criterion to Nuclear Power Generating Station Protection System,'' which describes the application of the single-failure criterion). IEEE Std 352-1975, ''Guide for General Principles of Reliability Analysis of Nuclear Power Generating Station Protection Systems,'' provides guidance in the application and use of reliability techniques referred to in this standard

  8. Power requirements for commercial communications spacecraft

    Science.gov (United States)

    Billerbeck, W. J.

    1985-01-01

    Historical data on commercial spacecraft power systems are presented and their power requirements to the growth of satellite communications channel usage are related. Some approaches for estimating future power requirements of this class of spacecraft through the year 2000 are proposed. The key technology drivers in satellite power systems are addressed. Several technological trends in such systems are described, focusing on the most useful areas for research and development of major subsystems, including solar arrays, energy storage, and power electronics equipment.

  9. 17 CFR 1.52 - Self-regulatory organization adoption and surveillance of minimum financial requirements.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Self-regulatory organization... Miscellaneous § 1.52 Self-regulatory organization adoption and surveillance of minimum financial requirements. (a) Each self-regulatory organization must adopt, and submit for Commission approval, rules...

  10. A 34 ampere-hour nickel-cadmium minimum trickle charge testing

    Science.gov (United States)

    Timmerman, P. J.

    1985-01-01

    The current rates used for trickle charging batteries are critical in maintaining a full charge and in preventing an overcharge condition. The importance of the trickle charge rate comes from the design, maintenance and operational requirements of an electrical power system. The results of minimum trickle charge testing performed on six 34 ampere-hour, nickel-cadmium cells manufactured by General Electric are described. The purpose of the testing was to identify the minimum trickle charge rates at temperatures of 15 C and 30 C.

  11. Propulsion element requirements using electrical power system unscheduled power

    Science.gov (United States)

    Zimmermann, Frank; Hodge, Kathy

    1989-01-01

    The suitability of using the electrical energy from the Space Station's Electrical Power System (EPS) during the periods of peak solar insolation which is currently not specifically allocated (unscheduled power) to produce propulsion propellants, gaseous hydrogen, and oxygen by electrolyzing water is investigated. Reboost propellant requirements are emphasized, but the results are more generally relevant because the balance of recurring propellant requirements are an order of magnitude smaller and the nonrecurring requirements are not significant on an average basis.

  12. Minimum cost solution of wind–photovoltaic based stand-alone power systems for remote consumers

    International Nuclear Information System (INIS)

    Kaldellis, J.K.; Zafirakis, D.; Kavadias, K.

    2012-01-01

    Renewable energy sources (RES) based stand-alone systems employing either wind or solar power and energy storage comprise a reliable energy alternative, on top of conventional diesel-electric generator sets, commonly used by remote consumers. However, such systems usually imply the need for oversizing and considerable energy storage requirements leading to relatively high costs. On the other hand, hybrid configurations that may exploit both wind and solar potential of a given area may considerably reduce energy storage capacity and improve the economic performance of the system. In this context, an integrated techno-economic methodology for the evaluation of hybrid wind–photovoltaic stand-alone power systems is currently developed, aiming at the designation of optimum configurations for a typical remote consumer, using economic performance criteria. For the problem investigation, the developed evaluation model is applied to four representative areas of the Greek territory with different wind potential characteristics in order to obtain optimum configurations on the basis of minimum initial investment, 10-year and 20-year total cost. According to the results obtained, the proposed solution is favorably compared with all other stand-alone energy alternatives, reflecting the ability of hybrid systems to adjust even in areas where the local RES potential is not necessarily of high quality. - Highlights: ► Wind- and PV-stand alone systems often imply use of extreme battery capacity. ► Hybrid wind–PV systems may reduce energy storage requirements and associated costs. ► An optimization methodology is developed, based on economic performance criteria. ► Methodology is applied to four Greek regions of different wind potential. ► Results obtained reflect the hybrid solution's advantages over other alternatives.

  13. 42 CFR 84.118 - Half-mask facepieces, full facepieces, and mouthpieces; fit; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Half-mask facepieces, full facepieces, and... OF RESPIRATORY PROTECTIVE DEVICES Gas Masks § 84.118 Half-mask facepieces, full facepieces, and mouthpieces; fit; minimum requirements. (a) Half-mask facepieces and full facepieces shall be designed and...

  14. Joint Antenna Selection and Precoding Optimization for Small-Cell Network with Minimum Power Consumption

    Directory of Open Access Journals (Sweden)

    Qiang Sun

    2017-01-01

    Full Text Available We focus on the power consumption problem for a downlink multiuser small-cell network (SCN considering both the quality of service (QoS and power constraints. First based on a practical power consumption model taking into account both the dynamic transmit power and static circuit power, we formulate and then transform the power consumption optimization problem into a convex problem by using semidefinite relaxation (SDR technique and obtain the optimal solution by the CVX tool. We further note that the SDR-based solution becomes infeasible for realistic implementation due to its heavy backhaul burden and computational complexity. To this end, we propose an alternative suboptimal algorithm which has low implementation overhead and complexity, based on minimum mean square error (MMSE precoding. Furthermore, we propose a distributed correlation-based antenna selection (DCAS algorithm combining with our optimization algorithms to reduce the static circuit power consumption for the SCN. Finally, simulation results demonstrate that our proposed suboptimal algorithm is very effective on power consumption minimization, with significantly reduced backhaul burden and computational complexity. Moreover, we show that our optimization algorithms with DCAS have less power consumption than the other benchmark algorithms.

  15. Standby battery requirements for telecommunications power

    Energy Technology Data Exchange (ETDEWEB)

    May, G.J. [The Focus Partnership, 126 Main Street, Swithland, Loughborough, Leics LE12 8TJ (United Kingdom)

    2006-08-25

    The requirements for standby power for telecommunications are changing as the network moves from conventional systems to Internet Protocol (IP) telephony. These new systems require higher power levels closer to the user but the level of availability and reliability cannot be compromised if the network is to provide service in the event of a failure of the public utility. Many parts of these new networks are ac rather than dc powered with UPS systems for back-up power. These generally have lower levels of reliability than dc systems and the network needs to be designed such that overall reliability is not reduced through appropriate levels of redundancy. Mobile networks have different power requirements. Where there is a high density of nodes, continuity of service can be reasonably assured with short autonomy times. Furthermore, there is generally no requirement that these networks are the provider of last resort and therefore, specifications for continuity of power are directed towards revenue protection and overall reliability targets. As a result of these changes, battery requirements for reserve power are evolving. Shorter autonomy times are specified for parts of the network although a large part will continue to need support for hours rather minutes. Operational temperatures are increasing and battery solutions that provide longer life in extreme conditions are becoming important. Different battery technologies will be discussed in the context of these requirements. Conventional large flooded lead/acid cells both with pasted and tubular plates are used in larger central office applications but the majority of requirements are met with valve-regulated lead/acid (VRLA) batteries. The different types of VRLA battery will be described and their suitability for various applications outlined. New developments in battery construction and battery materials have improved both performance and reliability in recent years. Alternative technologies are also being proposed

  16. Adaptive Reactive Power Control of PV Power Plants for Improved Power Transfer Capability under Ultra-Weak Grid Conditions

    DEFF Research Database (Denmark)

    Yang, Dongsheng; Wang, Xiongfei; Liu, Fangcheng

    2018-01-01

    with the unity power factor. Then, considering the reactive power compensation from PV inverters, the minimum SCR in respect to Power Factor (PF) is derived, and the optimized coordination of the active and reactive power is exploited. It is revealed that the power transfer capability of PV power plant under...... of a 200 MW PV power plant demonstrate that the proposed method can ensure the rated power transfer of PV power plant with the SCR of 1.25, provided that the PV inverters are operated with the minimal PF=0.9.......This paper analyzes the power transfer limitation of the PV power plant under the ultra-weak grid condition, i.e., when the Short-Circuit Ratio (SCR) is close to 1. It explicitly identifies that a minimum SCR of 2 is required for the PV power plant to deliver the rated active power when operating...

  17. QA manpower requirement for nuclear power plants

    International Nuclear Information System (INIS)

    Link, M.

    1980-01-01

    To ensure the quality of the plant, QA activities are to be performed by the owner, the main contractor, the subcontractors and the Licensing Authority. The responsibilities of the QA-personnel of these organizations comprise as a minimum the control of the quality assurance systems and the proof of the quality requirements. Numbers of the required QA-personnel, designated for different tasks and recommended educational levels and professional qualifications will be given. (orig./RW)

  18. 30 CFR 75.1107-4 - Automatic fire sensors and manual actuators; installation; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Automatic fire sensors and manual actuators... § 75.1107-4 Automatic fire sensors and manual actuators; installation; minimum requirements. (a)(1... sensors or equivalent shall be installed for each 50 square feet of top surface area, or fraction thereof...

  19. Combination of Markov chain and optimal control solved by Pontryagin’s Minimum Principle for a fuel cell/supercapacitor vehicle

    International Nuclear Information System (INIS)

    Hemi, Hanane; Ghouili, Jamel; Cheriti, Ahmed

    2015-01-01

    Highlights: • A combination of Markov chain and an optimal control solved by Pontryagin’s Minimum Principle is presented. • This strategy is applied to hybrid electric vehicle dynamic model. • The hydrogen consumption is analyzed for two different vehicle mass and drive cycle. • The supercapacitor and fuel cell behavior is analyzed at high or sudden required power. - Abstract: In this article, a real time optimal control strategy based on Pontryagin’s Minimum Principle (PMP) combined with the Markov chain approach is used for a fuel cell/supercapacitor electrical vehicle. In real time, at high power and at high speed, two phenomena are observed. The first is obtained at higher required power, and the second is observed at sudden power demand. To avoid these situations, the Markov chain model is proposed to predict the future power demand during a driving cycle. The optimal control problem is formulated as an equivalent consumption minimization strategy (ECMS), that has to be solved by using the Pontryagin’s Minimum Principle. A Markov chain model is added as a separate block for a prediction of required power. This approach and the whole system are modeled and implemented using the MATLAB/Simulink. The model without Markov chain block and the model is with it are compared. The results presented demonstrate the importance of a Markov chain block added to a model

  20. Total Sulfur Amino Acid Requirements Are Not Altered in Children with Chronic Renal Insufficiency, but Minimum Methionine Needs Are Increased.

    Science.gov (United States)

    Elango, Rajavel; Humayun, Mohammad A; Turner, Justine M; Rafii, Mahroukh; Langos, Veronika; Ball, Ronald O; Pencharz, Paul B

    2017-10-01

    Background: The total sulfur amino acid (TSAA) and minimum Met requirements have been previously determined in healthy children. TSAA metabolism is altered in kidney disease. Whether TSAA requirements are altered in children with chronic renal insufficiency (CRI) is unknown. Objective: We sought to determine the TSAA (Met in the absence of Cys) requirements and minimum Met (in the presence of excess Cys) requirements in children with CRI. Methods: Five children (4 boys, 1 girl) aged 10 ± 2.6 y with CRI were randomly assigned to receive graded intakes of Met (0, 5, 10, 15, 25, and 35 mg · kg -1 · d -1 ) with no Cys in the diet. Four of the children (3 boys, 1 girl) were then randomly assigned to receive graded dietary intakes of Met (0, 2.5, 5, 7.5, 10, and 15 mg · kg -1 · d -1 ) with 21 mg · kg -1 · d -1 Cys. The mean TSAA and minimum Met requirements were determined by measuring the oxidation of l-[1- 13 C]Phe to 13 CO 2 (F 13 CO 2 ). A 2-phase linear-regression crossover analysis of the F 13 CO 2 data identified a breakpoint at minimal F 13 CO 2 Urine samples collected from all study days and from previous studies of healthy children were measured for sulfur metabolites. Results: The mean and population-safe (upper 95% CI) intakes of TSAA and minimum Met in children with CRI were determined to be 12.6 and 15.9 mg · kg -1 · d -1 and 7.3 and 10.9 mg · kg -1 · d -1 , respectively. In healthy school-aged children the mean and upper 95% CI intakes of TSAA and minimum Met were determined to be 12.9 and 17.2 mg · kg -1 · d -1 and 5.8 and 7.3 mg · kg -1 · d -1 , respectively. A comparison of the minimum Met requirements between healthy children and children with CRI indicated significant ( P < 0.05) differences. Conclusion: These results suggest that children with CRI have a similar mean and population-safe TSAA to that of healthy children, suggesting adequate Cys synthesis via transsulfuration, but higher minimum Met requirement, suggesting reduced

  1. Minimum Energy Requirements in Complex Distillation Arrangements

    Energy Technology Data Exchange (ETDEWEB)

    Halvorsen, Ivar J

    2001-07-01

    Distillation is the most widely used industrial separation technology and distillation units are responsible for a significant part of the total heat consumption in the world's process industry. In this work we focus on directly (fully thermally) coupled column arrangements for separation of multicomponent mixtures. These systems are also denoted Petlyuk arrangements, where a particular implementation is the dividing wall column. Energy savings in the range of 20-40% have been reported with ternary feed mixtures. In addition to energy savings, such integrated units have also a potential for reduced capital cost, making them extra attractive. However, the industrial use has been limited, and difficulties in design and control have been reported as the main reasons. Minimum energy results have only been available for ternary feed mixtures and sharp product splits. This motivates further research in this area, and this thesis will hopefully give some contributions to better understanding of complex column systems. In the first part we derive the general analytic solution for minimum energy consumption in directly coupled columns for a multicomponent feed and any number of products. To our knowledge, this is a new contribution in the field. The basic assumptions are constant relative volatility, constant pressure and constant molar flows and the derivation is based on Underwood's classical methods. An important conclusion is that the minimum energy consumption in a complex directly integrated multi-product arrangement is the same as for the most difficult split between any pair of the specified products when we consider the performance of a conventional two-product column. We also present the Vmin-diagram, which is a simple graphical tool for visualisation of minimum energy related to feed distribution. The Vmin-diagram provides a simple mean to assess the detailed flow requirements for all parts of a complex directly coupled arrangement. The main purpose in the first

  2. Minimum Energy Requirements in Complex Distillation Arrangements

    Energy Technology Data Exchange (ETDEWEB)

    Halvorsen, Ivar J.

    2001-07-01

    Distillation is the most widely used industrial separation technology and distillation units are responsible for a significant part of the total heat consumption in the world's process industry. In this work we focus on directly (fully thermally) coupled column arrangements for separation of multicomponent mixtures. These systems are also denoted Petlyuk arrangements, where a particular implementation is the dividing wall column. Energy savings in the range of 20-40% have been reported with ternary feed mixtures. In addition to energy savings, such integrated units have also a potential for reduced capital cost, making them extra attractive. However, the industrial use has been limited, and difficulties in design and control have been reported as the main reasons. Minimum energy results have only been available for ternary feed mixtures and sharp product splits. This motivates further research in this area, and this thesis will hopefully give some contributions to better understanding of complex column systems. In the first part we derive the general analytic solution for minimum energy consumption in directly coupled columns for a multicomponent feed and any number of products. To our knowledge, this is a new contribution in the field. The basic assumptions are constant relative volatility, constant pressure and constant molar flows and the derivation is based on Underwood's classical methods. An important conclusion is that the minimum energy consumption in a complex directly integrated multi-product arrangement is the same as for the most difficult split between any pair of the specified products when we consider the performance of a conventional two-product column. We also present the Vmin-diagram, which is a simple graphical tool for visualisation of minimum energy related to feed distribution. The Vmin-diagram provides a simple mean to assess the detailed flow requirements for all parts of a complex directly coupled arrangement. The main purpose in

  3. Nuclear plant requirements during power system restoration

    International Nuclear Information System (INIS)

    Adamski, G.; Jenkins, R.; Gill, P.

    1995-01-01

    This paper is one of a series presented on behalf of the System Operation Subcommittee with the intent of focusing industry attention on power system restoration issues. This paper discusses a number of nuclear power plant requirements that require special attention during power system restoration

  4. 42 CFR 84.135 - Half-mask facepieces, full facepieces, hoods, and helmets; fit; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Half-mask facepieces, full facepieces, hoods, and... OF RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84.135 Half-mask facepieces, full facepieces, hoods, and helmets; fit; minimum requirements. (a) Half-mask facepieces and full facepieces shall...

  5. Experimental evaluation of the MIT-SNL period-generated minimum time control laws for the rapid adjustment of reactor power

    International Nuclear Information System (INIS)

    Bernard, J.A.; Kwok, K.S.; Menadier, P.T.; Thome, F.V.; Wyant, F.J.

    1987-01-01

    The rapid adjustment of reactor neutronic power has recently been achieved by developing control laws that determine the actuator mechanism velocity necessary to produce a specified reactor period. Designated as the 'MIT-SNL Period-Generated Minimum Time Control Laws,' these relations are closed-form expressions of general applicability. In particular, if there is no limitation on the available rate of change of reactivity, these laws can be used to achieve virtually any desired power profile including time optimal ones. The innovative aspect of these laws is that the rate of change of reactivity rather than the reactivity itself is used as the control signal. For example, relative to a time-optimal response, these laws function by altering the rate of change of reactivity so that the instantaneous period is stepped from infinity to its minimum allowed value, held at that value until the desired power level is attained, and then stepped back to infinity. The response is time-optimal because the power adjustment is continuously made at the maximum allowed rate

  6. Determining the minimum required uranium carbide content for HTGR UCO fuel kernels

    International Nuclear Information System (INIS)

    McMurray, Jacob W.; Lindemer, Terrence B.; Brown, Nicholas R.; Reif, Tyler J.; Morris, Robert N.; Hunn, John D.

    2017-01-01

    Highlights: • The minimum required uranium carbide content for HTGR UCO fuel kernels is calculated. • More nuclear and chemical factors have been included for more useful predictions. • The effect of transmutation products, like Pu and Np, on the oxygen distribution is included for the first time. - Abstract: Three important failure mechanisms that must be controlled in high-temperature gas-cooled reactor (HTGR) fuel for certain higher burnup applications are SiC layer rupture, SiC corrosion by CO, and coating compromise from kernel migration. All are related to high CO pressures stemming from O release when uranium present as UO 2 fissions and the O is not subsequently bound by other elements. In the HTGR kernel design, CO buildup from excess O is controlled by the inclusion of additional uranium apart from UO 2 in the form of a carbide, UC x and this fuel form is designated UCO. Here general oxygen balance formulas were developed for calculating the minimum UC x content to ensure negligible CO formation for 15.5% enriched UCO taken to 16.1% actinide burnup. Required input data were obtained from CALPHAD (CALculation of PHAse Diagrams) chemical thermodynamic models and the Serpent 2 reactor physics and depletion analysis tool. The results are intended to be more accurate than previous estimates by including more nuclear and chemical factors, in particular the effect of transmuted Pu and Np oxides on the oxygen distribution as the fuel kernel composition evolves with burnup.

  7. Technological implications of fusion power: requirements and status

    International Nuclear Information System (INIS)

    Steiner, D.

    1978-01-01

    The major technological requirements for fusion power, as implied by current conceptual designs of fusion power plants, are identified and assessed relative to the goals of existing technology programs. The focus of the discussion is on the tokamak magnetic confinement concept; however, key technological requirements of mirror magnetic confinement systems and of inertial confinement concepts will also be addressed. The required technology is examined on the basis of three general areas of concern: (a) the power balance, that is, the unique power handling requirements associated with the production of electrical power by fusion; (b) reactor design, focusing primarily on the requirements imposed by a tritium-based fuel cycle, thermal hydraulic considerations, and magnet systems; and (c) materials considerations, including radiation damage effects, neutron-induced activation, and resource limitations

  8. Nuclear power strategy: requirements for technology

    International Nuclear Information System (INIS)

    Orlov, V.V.; Rachkov, V.I.

    2001-01-01

    The possible role of nuclear power in sustainable development demands answers to at least three questions: Is large-scale nuclear power essential to future development? - Is it feasible to have modern nuclear power transformed for large-scale deployment? - When will large-scale nuclear power be practically needed? The questions are analysed with the requirements to be fulfilled concerning present-day technologies

  9. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man month study was undertaken to identify utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980s. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980s. The issues are not meant to reflect a negative view of fusion, but are items that must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980s were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  10. Pharmacovigilance in India, Uganda and South Africa with Reference to WHO’s Minimum Requirements

    Directory of Open Access Journals (Sweden)

    Karen Maigetter

    2015-05-01

    Full Text Available Background Pharmacovigilance (PV data are crucial for ensuring safety and effectiveness of medicines after drugs have been granted marketing approval. This paper describes the PV systems of India, Uganda and South Africa based on literature and Key Informant (KI interviews and compares them with the World Health Organization’s (WHO’s minimum PV requirements for a Functional National PV System. Methods A documentary analysis of academic literature and policy reports was undertaken to assess the medicines regulatory systems and policies in the three countries. A gap analysis from the document review indicated a need for further research in PV. KI interviews covered topics on PV: structure and practices of the system; current regulatory policy; capacity limitations, staffing, funding and training; availability and reporting of data; and awareness and usage of the systems. Twenty interviews were conducted in India, 8 in Uganda and 11 in South Africa with government officials from the ministries of health, national regulatory authorities, pharmaceutical producers, Non-Governmental Organizations (NGOs, members of professional associations and academia. The findings from the literature and KI interviews were compared with WHO’s minimum requirements. Results All three countries were confronted with similar barriers: lack of sufficient funding, limited number of trained staff, inadequate training programs, unclear roles and poor coordination of activities. Although KI interviews represented viewpoints of the respondents, the findings confirmed the documentary analysis of the literature. Although South Africa has a legal requirement for PV, we found that the three countries uniformly lacked adequate capacity to monitor medicines and evaluate risks according to the minimum standards of the WHO. Conclusion A strong PV system is an important part of the overall medicine regulatory system and reflects on the stringency and competence of the regulatory

  11. Output Power Control of Wind Turbine Generator by Pitch Angle Control using Minimum Variance Control

    Science.gov (United States)

    Senjyu, Tomonobu; Sakamoto, Ryosei; Urasaki, Naomitsu; Higa, Hiroki; Uezato, Katsumi; Funabashi, Toshihisa

    In recent years, there have been problems such as exhaustion of fossil fuels, e. g., coal and oil, and environmental pollution resulting from consumption. Effective utilization of renewable energies such as wind energy is expected instead of the fossil fuel. Wind energy is not constant and windmill output is proportional to the cube of wind speed, which cause the generated power of wind turbine generators (WTGs) to fluctuate. In order to reduce fluctuating components, there is a method to control pitch angle of blades of the windmill. In this paper, output power leveling of wind turbine generator by pitch angle control using an adaptive control is proposed. A self-tuning regulator is used in adaptive control. The control input is determined by the minimum variance control. It is possible to compensate control input to alleviate generating power fluctuation with using proposed controller. The simulation results with using actual detailed model for wind power system show effectiveness of the proposed controller.

  12. 42 CFR 84.1135 - Half-mask facepieces, full facepieces, hoods, helmets, and mouthpieces; fit; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Half-mask facepieces, full facepieces, hoods... Air-Purifying High Efficiency Respirators and Combination Gas Masks § 84.1135 Half-mask facepieces, full facepieces, hoods, helmets, and mouthpieces; fit; minimum requirements. (a) Half-mask facepieces...

  13. 42 CFR 84.198 - Half-mask facepieces, full facepieces, mouthpieces, hoods, and helmets; fit; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Half-mask facepieces, full facepieces, mouthpieces... APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Chemical Cartridge Respirators § 84.198 Half-mask facepieces, full facepieces, mouthpieces, hoods, and helmets; fit; minimum requirements. (a) Half-mask facepieces...

  14. Electronic Nose Testing Procedure for the Definition of Minimum Performance Requirements for Environmental Odor Monitoring

    Directory of Open Access Journals (Sweden)

    Lidia Eusebio

    2016-09-01

    Full Text Available Despite initial enthusiasm towards electronic noses and their possible application in different fields, and quite a lot of promising results, several criticalities emerge from most published research studies, and, as a matter of fact, the diffusion of electronic noses in real-life applications is still very limited. In general, a first step towards large-scale-diffusion of an analysis method, is standardization. The aim of this paper is describing the experimental procedure adopted in order to evaluate electronic nose performances, with the final purpose of establishing minimum performance requirements, which is considered to be a first crucial step towards standardization of the specific case of electronic nose application for environmental odor monitoring at receptors. Based on the experimental results of the performance testing of a commercialized electronic nose type with respect to three criteria (i.e., response invariability to variable atmospheric conditions, instrumental detection limit, and odor classification accuracy, it was possible to hypothesize a logic that could be adopted for the definition of minimum performance requirements, according to the idea that these are technologically achievable.

  15. Winding Design for Minimum Power Loss and Low-Cost Manufacture in Application to Fixed-Speed PM Generator

    OpenAIRE

    Wrobel, Rafal; Staton, David; Lock, Richard J; Booker, Julian D; Drury, David

    2015-01-01

    This paper presents the results from a coupled thermal and power loss analysis of an open-slot permanent-magnet (PM) generator. The research focus has been placed on the winding design providing minimum power loss at an ac operation, together with low-cost manufacture. The analyzed PM generator is intended to operate at a fixed speed, allowing for the winding design to be finely tuned for a single operating point. Such a design approach has not been widely reported in literature, and the exis...

  16. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man-month study, jointly funded by EPRI and McDonnell Douglas Astronautics Company-EAST, was undertaken to identify the utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980's. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980's. The issues are not meant to reflect a negative view of fusion, but are items which must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980's were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  17. Nuclear Space Power Systems Materials Requirements

    International Nuclear Information System (INIS)

    Buckman, R.W. Jr.

    2004-01-01

    High specific energy is required for space nuclear power systems. This generally means high operating temperatures and the only alloy class of materials available for construction of such systems are the refractory metals niobium, tantalum, molybdenum and tungsten. The refractory metals in the past have been the construction materials selected for nuclear space power systems. The objective of this paper will be to review the past history and requirements for space nuclear power systems from the early 1960's through the SP-100 program. Also presented will be the past and present status of refractory metal alloy technology and what will be needed to support the next advanced nuclear space power system. The next generation of advanced nuclear space power systems can benefit from the review of this past experience. Because of a decline in the refractory metal industry in the United States, ready availability of specific refractory metal alloys is limited

  18. An Experimental Investigation On Minimum Compressive Strength Of Early Age Concrete To Prevent Frost Damage For Nuclear Power Plant Structures In Cold Climates

    International Nuclear Information System (INIS)

    Koh, Kyungtaek; Kim, Dogyeum; Park, Chunjin; Ryu, Gumsung; Park, Jungjun; Lee, Janghwa

    2013-01-01

    Concrete undergoing early frost damage in cold weather will experience significant loss of not only strength, but also of permeability and durability. Accordingly, concrete codes like ACI-306R prescribe a minimum compressive strength and duration of curing to prevent frost damage at an early age and secure the quality of concrete. Such minimum compressive strength and duration of curing are mostly defined based on the strength development of concrete. However, concrete subjected to frost damage at early age may not show a consistent relationship between its strength and durability. Especially, since durability of concrete is of utmost importance in nuclear power plant structures, this relationship should be imperatively clarified. Therefore, this study verifies the feasibility of the minimum compressive strength specified in the codes like ACI-306R by evaluating the strength development and the durability preventing the frost damage of early age concrete for nuclear power plant. The results indicate that the value of 5 MPa specified by the concrete standards like ACI-306R as the minimum compressive strength to prevent the early frost damage is reasonable in terms of the strength development, but seems to be inappropriate in the viewpoint of the resistance to chloride ion penetration and freeze-thaw. Consequently, it is recommended to propose a minimum compressive strength preventing early frost damage in terms of not only the strength development, but also in terms of the durability to secure the quality of concrete for nuclear power plants in cold climates

  19. An Experimental Investigation On Minimum Compressive Strength Of Early Age Concrete To Prevent Frost Damage For Nuclear Power Plant Structures In Cold Climates

    Energy Technology Data Exchange (ETDEWEB)

    Koh, Kyungtaek; Kim, Dogyeum; Park, Chunjin; Ryu, Gumsung; Park, Jungjun; Lee, Janghwa [Korea Institute Construction Technology, Goyang (Korea, Republic of)

    2013-06-15

    Concrete undergoing early frost damage in cold weather will experience significant loss of not only strength, but also of permeability and durability. Accordingly, concrete codes like ACI-306R prescribe a minimum compressive strength and duration of curing to prevent frost damage at an early age and secure the quality of concrete. Such minimum compressive strength and duration of curing are mostly defined based on the strength development of concrete. However, concrete subjected to frost damage at early age may not show a consistent relationship between its strength and durability. Especially, since durability of concrete is of utmost importance in nuclear power plant structures, this relationship should be imperatively clarified. Therefore, this study verifies the feasibility of the minimum compressive strength specified in the codes like ACI-306R by evaluating the strength development and the durability preventing the frost damage of early age concrete for nuclear power plant. The results indicate that the value of 5 MPa specified by the concrete standards like ACI-306R as the minimum compressive strength to prevent the early frost damage is reasonable in terms of the strength development, but seems to be inappropriate in the viewpoint of the resistance to chloride ion penetration and freeze-thaw. Consequently, it is recommended to propose a minimum compressive strength preventing early frost damage in terms of not only the strength development, but also in terms of the durability to secure the quality of concrete for nuclear power plants in cold climates.

  20. 42 CFR 84.175 - Half-mask facepieces, full facepieces, hoods, helmets, and mouthpieces; fit; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Half-mask facepieces, full facepieces, hoods....175 Half-mask facepieces, full facepieces, hoods, helmets, and mouthpieces; fit; minimum requirements. (a) Half-mask facepieces and full facepieces shall be designed and constructed to fit persons with...

  1. A mathematical technique for hybrid power system design with energy loss considerations

    International Nuclear Information System (INIS)

    Lee, Jui-Yuan; Chen, Cheng-Liang; Chen, Hui-Chu

    2014-01-01

    Highlights: • A superstructure-based model is developed for hybrid power system design. • The model considers various power losses occurring in hybrid power systems. • The model locates rigorous outsourced electricity targets. • The model determines the minimum electricity storage capacity required. • Three literature case studies are solved to demonstrate the use of the model. - Abstract: This paper presents a generic mathematical optimisation model for the design of hybrid power systems (HPSs). The model takes into account power losses during the allocation of power generated from renewables to appliance loads, and is formulated as a linear programme (LP) based on a superstructure including all possible power allocation options in a typical HPS. With given power source and demand data for an HPS, the minimum outsourced electricity supply and the minimum electricity storage capacity required can be determined through a two-step optimisation. Three literature case studies are solved to illustrate the proposed approach

  2. 42 CFR 84.149 - Type C supplied-air respirator, demand and pressure demand class; minimum requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Type C supplied-air respirator, demand and pressure demand class; minimum requirements. 84.149 Section 84.149 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT... OF RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84.149 Type C supplied-air respirator...

  3. 30 CFR 71.402 - Minimum requirements for bathing facilities, change rooms, and sanitary flush toilet facilities.

    Science.gov (United States)

    2010-07-01

    ... nonirritating cleansing agent shall be provided for use at each shower. (2) Sanitary flush toilet facilities. (i..., change rooms, and sanitary flush toilet facilities. 71.402 Section 71.402 Mineral Resources MINE SAFETY... Rooms, and Sanitary Flush Toilet Facilities at Surface Coal Mines § 71.402 Minimum requirements for...

  4. The minimum price required by investors in IPOs

    Directory of Open Access Journals (Sweden)

    Ahmed Jeribi

    2015-01-01

    Full Text Available With regard to purchasing Tunisian IPOs shares, the current paper aims at considering two types of investors: a non-institutional investor and an institutional one. Each is concerned with placing a purchase order at the offer price during the subscription period. In line with the literature on IPOs, we attempted to determine the minimum price required by an investor allowing for recovering the initial investment, information costs, transaction costs, and the offsetting of shortfall. We expect that the initial return of an IPO share in the Tunisian market is positively related to the following factors: the number of non-institutional investors participating during the subscription period, the subscription ratio of institutional investors, the expected rate of return by investors, the gap between the closing date of the subscription period and the day following the announcement of the subscription result, the gap between the announcement of the subscription result and the first listing day, the number of trading days, the cost of information and the transaction costs. However, it is negatively related to other determinants, such as the discount level, the number of shares allocated for a non-institutional investor and the number of offered shares, which are allocated to non-institutional investors.

  5. The minimum area requirements (MAR) for giant panda: an empirical study.

    Science.gov (United States)

    Qing, Jing; Yang, Zhisong; He, Ke; Zhang, Zejun; Gu, Xiaodong; Yang, Xuyu; Zhang, Wen; Yang, Biao; Qi, Dunwu; Dai, Qiang

    2016-12-08

    Habitat fragmentation can reduce population viability, especially for area-sensitive species. The Minimum Area Requirements (MAR) of a population is the area required for the population's long-term persistence. In this study, the response of occupancy probability of giant pandas against habitat patch size was studied in five of the six mountain ranges inhabited by giant panda, which cover over 78% of the global distribution of giant panda habitat. The probability of giant panda occurrence was positively associated with habitat patch area, and the observed increase in occupancy probability with patch size was higher than that due to passive sampling alone. These results suggest that the giant panda is an area-sensitive species. The MAR for giant panda was estimated to be 114.7 km 2 based on analysis of its occupancy probability. Giant panda habitats appear more fragmented in the three southern mountain ranges, while they are large and more continuous in the other two. Establishing corridors among habitat patches can mitigate habitat fragmentation, but expanding habitat patch sizes is necessary in mountain ranges where fragmentation is most intensive.

  6. Reactive power compensating system

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Timothy J. (Redondo Beach, CA); El-Sharkawi, Mohamed A. (Renton, WA); Venkata, Subrahmanyam S. (Seattle, WA)

    1987-01-01

    The reactive power of an induction machine is compensated by providing fixed capacitors on each phase line for the minimum compensation required, sensing the current on one line at the time its voltage crosses zero to determine the actual compensation required for each phase, and selecting switched capacitors on each line to provide the balance of the compensation required.

  7. Applicability of the minimum entropy generation method for optimizing thermodynamic cycles

    Institute of Scientific and Technical Information of China (English)

    Cheng Xue-Tao; Liang Xin-Gang

    2013-01-01

    Entropy generation is often used as a figure of merit in thermodynamic cycle optimizations.In this paper,it is shown that the applicability of the minimum entropy generation method to optimizing output power is conditional.The minimum entropy generation rate and the minimum entropy generation number do not correspond to the maximum output power when the total heat into the system of interest is not prescribed.For the cycles whose working medium is heated or cooled by streams with prescribed inlet temperatures and prescribed heat capacity flow rates,it is theoretically proved that both the minimum entropy generation rate and the minimum entropy generation number correspond to the maximum output power when the virtual entropy generation induced by dumping the used streams into the environment is considered.However,the minimum principle of entropy generation is not tenable in the case that the virtual entropy generation is not included,because the total heat into the system of interest is not fixed.An irreversible Carnot cycle and an irreversible Brayton cycle are analysed.The minimum entropy generation rate and the minimum entropy generation number do not correspond to the maximum output power if the heat into the system of interest is not prescribed.

  8. Applicability of the minimum entropy generation method for optimizing thermodynamic cycles

    International Nuclear Information System (INIS)

    Cheng Xue-Tao; Liang Xin-Gang

    2013-01-01

    Entropy generation is often used as a figure of merit in thermodynamic cycle optimizations. In this paper, it is shown that the applicability of the minimum entropy generation method to optimizing output power is conditional. The minimum entropy generation rate and the minimum entropy generation number do not correspond to the maximum output power when the total heat into the system of interest is not prescribed. For the cycles whose working medium is heated or cooled by streams with prescribed inlet temperatures and prescribed heat capacity flow rates, it is theoretically proved that both the minimum entropy generation rate and the minimum entropy generation number correspond to the maximum output power when the virtual entropy generation induced by dumping the used streams into the environment is considered. However, the minimum principle of entropy generation is not tenable in the case that the virtual entropy generation is not included, because the total heat into the system of interest is not fixed. An irreversible Carnot cycle and an irreversible Brayton cycle are analysed. The minimum entropy generation rate and the minimum entropy generation number do not correspond to the maximum output power if the heat into the system of interest is not prescribed. (general)

  9. Minimum Analytical Chemistry Requirements for Pit Manufacturing at Los Alamos National Laboratory; TOPICAL

    International Nuclear Information System (INIS)

    Moy, Ming M.; Leasure, Craig S.

    1998-01-01

    Analytical chemistry is one of several capabilities necessary for executing the Stockpile Stewardship and Management Program at Los Alamos National Laboratory (LANL). Analytical chemistry capabilities reside in the Chemistry Metallurgy Research (CMR) Facility and Plutonium Facility (TA-55). These analytical capabilities support plutonium recovery operations, plutonium metallurgy, and waste management. Analytical chemistry capabilities at both nuclear facilities are currently being configured to support pit manufacturing. This document summarizes the minimum analytical chemistry capabilities required to sustain pit manufacturing at LANL. By the year 2004, approximately$16 million will be required to procure analytical instrumentation to support pit manufacturing. In addition,$8.5 million will be required to procure glovebox enclosures. An estimated 50% increase in costs has been included for installation of analytical instruments and glovebox enclosures. However, no general and administrative (G and A) taxes have been included. If an additional 42.5/0 G and A tax were to be incurred, approximately$35 million would be required over the next five years to prepare analytical chemistry to support a 50-pit-per-year manufacturing capability by the year 2004

  10. Power production at minimum risk

    International Nuclear Information System (INIS)

    Fremlin, J.H.

    1983-01-01

    A summary, including extensive quotations, is given of the main themes of a lecture by Prof. Fremlin in which he assessed the risks inherent in the use of various power systems. Considering only hazards which affect members of the public, the methods used to quantify such risks are examined. Both so-called inconspicuous hazards from radiation effects and conspicuous risks from accidents which could arise from nuclear power stations are compared to those from other types of power generation. The small risk arising from nuclear wastes is stressed. The lecturer concluded that he would not let 'tiny differences of risk' affect his decisions on energy planning. (U.K.)

  11. Load following operation of nuclear power plants for meeting power system requirements

    International Nuclear Information System (INIS)

    Isoda, Hachiro

    1987-01-01

    This paper describes a calculating program on the availability factors of nuclear, thermal and pumed storage hydro power stations and some calculated results for typical three load factors, 55 %, 60 % and 71 %, are provided when the share of the nuclea power station in the generation facilities is increased. The load following requirement of the nuclear power station is also provided. Load following requirement: If there is a 10 % pumped storage hydro power station, the nuclear power station enables to be operated with its rated output up to 30 % - 35 % of its share. Its daily load following operation for 40 % and 50 % nuclear power station needs every weekend and every day respectively. Availability factor: The availability factor of the nuclear power station manages to get 80 % (maximum availability factor of the nuclear power station in this study) up to 30 % share of it with 10 % pumpued storage hydro power station. When the nuclear power station shares 40 % and 50 %, its availability factor decreases down 1 % and 5 % respectively. (author)

  12. Nuclear power manpower and training requirements

    International Nuclear Information System (INIS)

    Whan, G.A.

    1984-01-01

    A broad spectrum of technical personnel is required to conduct a national nuclear power program, predominantly electrical, mechanical, and nuclear engineers and health physicists. The need for nuclear education and training, even in the early planning states, is the topic of this paper. Experience gained in the United States can provide useful information to Asia-Pacific countries developing nuclear power programs. Including both on-site and off-site personnel, U.S. plants average about 570 workers for BWRs and 700 for PWRs. The need for an additional 57,000 technical employees over the next decade is projected. The technical backgrounds of the manpower required to operate and support a nuclear power plant are distinctly different from those used by non-nuclear utilities. Manpower cannot be transferred from fossil fuel plants without extensive training. Meeting the demand for nuclear education and training must be a friendly partnership among universities, government, and industry. The long-term supply of nuclear-educated personnel requires strong, government-supported universities. Most specific training, however, must be provided by industry. (author)

  13. A Pareto-Improving Minimum Wage

    OpenAIRE

    Eliav Danziger; Leif Danziger

    2014-01-01

    This paper shows that a graduated minimum wage, in contrast to a constant minimum wage, can provide a strict Pareto improvement over what can be achieved with an optimal income tax. The reason is that a graduated minimum wage requires high-productivity workers to work more to earn the same income as low-productivity workers, which makes it more difficult for the former to mimic the latter. In effect, a graduated minimum wage allows the low-productivity workers to benefit from second-degree pr...

  14. 75 FR 77561 - Regulations Issued Under the Export Grape and Plum Act; Revision to the Minimum Requirements

    Science.gov (United States)

    2010-12-13

    ... amount of product sold and an increase in returns to producers, shippers, exporters, and carriers... additional 2 percent tolerance for sealed berry cracks on the Exotic grape variety. This action was... minimum size and quality requirements for export shipments of any variety of vinifera species table grapes...

  15. Electrofishing power requirements in relation to duty cycle

    Science.gov (United States)

    Miranda, L.E.; Dolan, C.R.

    2004-01-01

    Under controlled laboratory conditions we measured the electrical peak power required to immobilize (i.e., narcotize or tetanize) fish of various species and sizes with duty cycles (i.e., percentage of time a field is energized) ranging from 1.5% to 100%. Electrofishing effectiveness was closely associated with duty cycle. Duty cycles of 10-50% required the least peak power to immobilize fish; peak power requirements increased gradually above 50% duty cycle and sharply below 10%. Small duty cycles can increase field strength by making possible higher instantaneous peak voltages that allow the threshold power needed to immobilize fish to radiate farther away from the electrodes. Therefore, operating within the 10-50% range of duty cycles would allow a larger radius of immobilization action than operating with higher duty cycles. This 10-50% range of duty cycles also coincided with some of the highest margins of difference between the electrical power required to narcotize and that required to tetanize fish. This observation is worthy of note because proper use of duty cycle could help reduce the mortality associated with tetany documented by some authors. Although electrofishing with intermediate duty cycles can potentially increase effectiveness of electrofishing, our results suggest that immobilization response is not fully accounted for by duty cycle because of a potential interaction between pulse frequency and duration that requires further investigation.

  16. Space nuclear-power reactor design based on combined neutronic and thermal-fluid analyses

    International Nuclear Information System (INIS)

    Koenig, D.R.; Gido, R.G.; Brandon, D.I.

    1985-01-01

    The design and performance analysis of a space nuclear-power system requires sophisticated analytical capabilities such as those developed during the nuclear rocket propulsion (Rover) program. In particular, optimizing the size of a space nuclear reactor for a given power level requires satisfying the conflicting requirements of nuclear criticality and heat removal. The optimization involves the determination of the coolant void (volume) fraction for which the reactor diameter is a minimum and temperature and structural limits are satisfied. A minimum exists because the critical diameter increases with increasing void fraction, whereas the reactor diameter needed to remove a specified power decreases with void fraction. The purpose of this presentation is to describe and demonstrate our analytical capability for the determination of minimum reactor size. The analysis is based on combining neutronic criticality calculations with OPTION-code thermal-fluid calculations

  17. Safety requirements for a nuclear power plant electric power system

    Energy Technology Data Exchange (ETDEWEB)

    Fouad, L F; Shinaishin, M A

    1988-06-15

    This work aims at identifying the safety requirements for the electric power system in a typical nuclear power plant, in view of the UNSRC and the IAEA. Description of a typical system is provided, followed by a presentation of the scope of the information required for safety evaluation of the system design and performance. The acceptance and design criteria that must be met as being specified by both regulatory systems, are compared. Means of implementation of such criteria as being described in the USNRC regulatory guides and branch technical positions on one hand and in the IAEA safety guides on the other hand are investigated. It is concluded that the IAEA regulations address the problems that may be faced with in countries having varying grid sizes ranging from large stable to small potentially unstable ones; and that they put emphasis on the onsite standby power supply. Also, in this respect the Americans identify the grid as the preferred power supply to the plant auxiliaries, while the IAEA leaves the possibility that the preferred power supply could be either the grid or the unit main generator depending on the reliability of each. Therefore, it is found that it is particularly necessary in this area of electric power supplies to deal with the IAEA and the American sets of regulations as if each complements and not supplements the other. (author)

  18. Power supply requirements for a tokamak fusion reactor

    International Nuclear Information System (INIS)

    Brooks, J.N.; Kustom, R.L.

    1979-02-01

    The power supply requirements for a 7-M major radius commercial tokamak reactor have been examined, using a system approach combining models of the reactor and poloidal coil set, plasma burn cycle and MHD calculations, and power supply characteristics and cost data. A conventional system using an MGF set and solid-state rectifier/inverter power supplies was studied in addition to systems using a homopolar generator, superconducting energy storage inductor, and dump resistors. The requirements and cost of the power supplies depend on several factors but most critically on the ohmic heating ramp time used for startup. Long ramp times (approx. > 8 s) seems to be feasible, from the standpoint of resistive volt-second losses, and would appear to make conventional systems quite competitive with nonconventional ones, which require further research and development

  19. Safety of nuclear power plants: Design. Safety requirements

    International Nuclear Information System (INIS)

    2000-01-01

    The present publication supersedes the Code on the Safety of Nuclear Power Plants: Design (Safety Series No. 50-C-D (Rev. 1), issued in 1988). It takes account of developments relating to the safety of nuclear power plants since the Code on Design was last revised. These developments include the issuing of the Safety Fundamentals publication, The Safety of Nuclear Installations, and the present revision of various safety standards and other publications relating to safety. Requirements for nuclear safety are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear power plants. It is recognized that technology and scientific knowledge advance, and nuclear safety and what is considered adequate protection are not static entities. Safety requirements change with these developments and this publication reflects the present consensus. This Safety Requirements publication takes account of the developments in safety requirements by, for example, including the consideration of severe accidents in the design process. Other topics that have been given more detailed attention include management of safety, design management, plant ageing and wearing out effects, computer based safety systems, external and internal hazards, human factors, feedback of operational experience, and safety assessment and verification. This publication establishes safety requirements that define the elements necessary to ensure nuclear safety. These requirements are applicable to safety functions and the associated structures, systems and components, as well as to procedures important to safety in nuclear power plants. It is expected that this publication will be used primarily for land based stationary nuclear power plants with water cooled reactors designed for electricity generation or for other heat production applications (such as district heating or desalination). It is recognized that in the case of

  20. Safety of nuclear power plants: Design. Safety requirements

    International Nuclear Information System (INIS)

    2004-01-01

    The present publication supersedes the Code on the Safety of Nuclear Power Plants: Design (Safety Series No. 50-C-D (Rev. 1), issued in 1988). It takes account of developments relating to the safety of nuclear power plants since the Code on Design was last revised. These developments include the issuing of the Safety Fundamentals publication, The Safety of Nuclear Installations, and the present revision of various safety standards and other publications relating to safety. Requirements for nuclear safety are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear power plants. It is recognized that technology and scientific knowledge advance, and nuclear safety and what is considered adequate protection are not static entities. Safety requirements change with these developments and this publication reflects the present consensus. This Safety Requirements publication takes account of the developments in safety requirements by, for example, including the consideration of severe accidents in the design process. Other topics that have been given more detailed attention include management of safety, design management, plant ageing and wearing out effects, computer based safety systems, external and internal hazards, human factors, feedback of operational experience, and safety assessment and verification. This publication establishes safety requirements that define the elements necessary to ensure nuclear safety. These requirements are applicable to safety functions and the associated structures, systems and components, as well as to procedures important to safety in nuclear power plants. It is expected that this publication will be used primarily for land based stationary nuclear power plants with water cooled reactors designed for electricity generation or for other heat production applications (such as district heating or desalination). It is recognized that in the case of

  1. Analytical and Algorithmic Approaches to Determine the Number of Sensor Nodes for Minimum Power Consumption in LWSNs

    Directory of Open Access Journals (Sweden)

    Ali Soner Kilinc

    2017-08-01

    Full Text Available A Linear Wireless Sensor Network (LWSN is a kind of wireless sensor network where the nodes are deployed in a line. Since the sensor nodes are energy restricted, energy efficiency becomes one of the most significant design issues for LWSNs as well as wireless sensor networks. With the proper deployment, the power consumption could be minimized by adjusting the distance between the sensor nodes which is known as hop length. In this paper, analytical and algorithmic approaches are presented to determine the number of hops and sensor nodes for minimum power consumption in a linear wireless sensor network including equidistantly placed sensor nodes.

  2. 46 CFR 111.10-4 - Power requirements, generating sources.

    Science.gov (United States)

    2010-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Supply § 111.10-4 Power requirements, generating sources. (a) The aggregate capacity of the electric ship's service generating sources required in § 111.10-3 must... or sources must be sufficient to supply those services necessary to provide normal operational...

  3. SB certification handout material requirements, test methods, responsibilities, and minimum classification levels for mixture-based specification for flexible base.

    Science.gov (United States)

    2012-10-01

    A handout with tables representing the material requirements, test methods, responsibilities, and minimum classification levels mixture-based specification for flexible base and details on aggregate and test methods employed, along with agency and co...

  4. Power supply requirements for a tokamak fusion reactor

    International Nuclear Information System (INIS)

    Brooks, J.N.; Kustom, R.L.

    1979-01-01

    The power supply requirements for a 7-m major radius commerical tokamak reactor have been examined, using a system approach combining models of the reactor and poloidal coil set, plasma burn cycle and magnetohydrodynamics calculations, and power supply characteristics and cost data. A conventional system using a motor-generator flywheel set and solid-state rectifier-inverter power supplies was studied in addition to systems using a homopolar generator, superconducting energy storage inductor, and dump resistors. The requirements and cost of the power supplies depend on several factors but most critically on the ohmic heating ramp time used for startup. Long ramp times (greater than or equal to 8 s) seem to be feasible, from the standpoint of resistive volt-second losses, and would appear to make conventional systems quite competitive with nonconventional ones, which require further research and development

  5. Man as a protective barrier in nuclear power technology: the requirements, viewed by the Federal Minister for Home Affairs

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1981-06-01

    Evaluation of nuclear power plant incidents frequently reveals man as a major element of risk. Yet, in a nuclear power plant man has the function of an important protective barrier, either by maintaining the plant, by detecting and limiting faults or incidents, or by taking proper measures in accidents. This is true despite, or perhaps because of, the high degree of plant automation. For this reason, it is indispensable that a high level of engineered plant safeguards be accompanied by a minimum of faults contributed by human action. This implies that the staff and their working conditions must meet the same stringent safety requirements as the nuclear power plant proper. Reactor manufacturers, nuclear power plant operators and the responsible authorities try to optimize this human contribution. The Federal Ministry of the Interior, through its Special Technical Guidelines and its continuation training measures, occupies an important position in this respect. Further measures and ordinances are being prepared by that Ministry

  6. A ROBUST CLUSTER HEAD SELECTION BASED ON NEIGHBORHOOD CONTRIBUTION AND AVERAGE MINIMUM POWER FOR MANETs

    Directory of Open Access Journals (Sweden)

    S.Balaji

    2015-06-01

    Full Text Available Mobile Adhoc network is an instantaneous wireless network that is dynamic in nature. It supports single hop and multihop communication. In this infrastructure less network, clustering is a significant model to maintain the topology of the network. The clustering process includes different phases like cluster formation, cluster head selection, cluster maintenance. Choosing cluster head is important as the stability of the network depends on well-organized and resourceful cluster head. When the node has increased number of neighbors it can act as a link between the neighbor nodes which in further reduces the number of hops in multihop communication. Promisingly the node with more number of neighbors should also be available with enough energy to provide stability in the network. Hence these aspects demand the focus. In weight based cluster head selection, closeness and average minimum power required is considered for purging the ineligible nodes. The optimal set of nodes selected after purging will compete to become cluster head. The node with maximum weight selected as cluster head. Mathematical formulation is developed to show the proposed method provides optimum result. It is also suggested that weight factor in calculating the node weight should give precise importance to energy and node stability.

  7. Power Factor Correction for Thyristor Equipment in Glass Industry ...

    African Journals Online (AJOL)

    Thyristor power controllers are now widely used in the glass industry for controlling furnace temperature. While offering a number of operational advantages, they operate at lagging power factors which require correction for minimum power cost. Harmonic resonance with the utility feed, however, complicate the use of ...

  8. Safety of Nuclear Power Plants: Design. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2012-01-01

    On the basis of the principles included in the Fundamental Safety Principles, IAEA Safety Standards Series No. SF-1, this Safety Requirements publication establishes requirements applicable to the design of nuclear power plants. It covers the design phase and provides input for the safe operation of the power plant. It elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  9. Beam heating requirements for a tokamak experimental power reactor

    International Nuclear Information System (INIS)

    Bertoncini, P.J.; Brooks, J.N.; Fasolo, J.A.; Stacey, W.M. Jr.

    1976-01-01

    Typical beam heating requirements for effective tokamak experimental power reactor (TEPR) operation have been studied in connection with the Argonne preliminary conceptual TEPR design. For an ignition level plasma (approximately 100 MWt fusion power) for the nominal case envisioned, the neutral beam is only used to heat the plasma to ignition. This typically requires a beam power output of 40 MW at 180 keV for about 3 sec with a total energy of 114 MJ supplied to the plasma. The beam requirements for an ignition device are not very sensitive to changes in wall-sputtered impurity levels or plasma resistivity. For a plasma that must be driven due to poor confinement, the beam must remain on for most of the burn cycle. For representative cases, beam powers of approximately 23 MW are required for a total on-time of 20 to 50 sec. Reqirements on power level, beam energy, on-time, and beam-generation efficiency all represent considerable advances over present technology. For the Argonne TEPR design, a total of 16 to 32 beam injectors is envisioned. For a 40-MW, 180-keV, one-component beam, each injector supplies about 7 to 14 A of neutrals to the plasma. For positive ion sources, about 50 to 100 A of ions are required per injector and some form of particle and/or energy recycling appears to be essential in order to meet the power and efficiency requirements

  10. Quality control of brachytherapy equipment in the Netherlands and Belgium: current practice and minimum requirements

    International Nuclear Information System (INIS)

    Elfrink, Robert J.M.; Kolkman-Deurloo, Inger-Karine K.; Kleffens, Herman J. van; Rijnders, Alex; Schaeken, Bob; Aalbers, Tony H.L.; Dries, Wim J.F.; Venselaar, Jack L.M.

    2002-01-01

    Background and purpose: Brachytherapy is applied in 39 radiotherapy institutions in The Netherlands and Belgium. Each institution has its own quality control (QC) programme to ensure safe and accurate dose delivery to the patient. The main goal of this work is to gain insight into the current practice of QC of brachytherapy in The Netherlands and Belgium and to reduce possible variations in test frequencies and tolerances by formulating a set of minimum QC-requirements. Materials and methods: An extensive questionnaire about QC of brachytherapy was distributed to and completed by the 39 radiotherapy institutions. A separate smaller questionnaire was sent to nine institutions performing intracoronary brachytherapy. The questions were related to safety systems, physical irradiation parameters and total time spent on QC. The results of the questionnaires were compared with recommendations given in international brachytherapy QC reports. Results: The answers to the questionnaires showed large variations in test frequencies and test methods. Furthermore, large variations in time spent on QC exist, which is mainly due to differences in QC-philosophy and differences in the available resources. Conclusions: Based on the results of the questionnaires and the comparison with the international recommendations, a set of minimum requirements for QC of brachytherapy has been formulated. These guidelines will be implemented in the radiotherapy institutions in The Netherlands and Belgium

  11. 29 CFR 783.43 - Computation of seaman's minimum wage.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Computation of seaman's minimum wage. 783.43 Section 783.43...'s minimum wage. Section 6(b) requires, under paragraph (2) of the subsection, that an employee...'s minimum wage requirements by reason of the 1961 Amendments (see §§ 783.23 and 783.26). Although...

  12. 23 CFR 420.107 - What is the minimum required expenditure of State planning and research funds for research...

    Science.gov (United States)

    2010-04-01

    ... RESEARCH PROGRAM ADMINISTRATION Administration of FHWA Planning and Research Funds § 420.107 What is the... 23 Highways 1 2010-04-01 2010-04-01 false What is the minimum required expenditure of State planning and research funds for research development and technology transfer? 420.107 Section 420.107...

  13. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2004-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  14. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  15. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2000-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations; to be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources; and to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  16. 29 CFR 505.3 - Prevailing minimum compensation.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Prevailing minimum compensation. 505.3 Section 505.3 Labor... HUMANITIES § 505.3 Prevailing minimum compensation. (a)(1) In the absence of an alternative determination...)(2) of this section, the prevailing minimum compensation required to be paid under the Act to the...

  17. Coupling between minimum scattering antennas

    DEFF Research Database (Denmark)

    Andersen, J.; Lessow, H; Schjær-Jacobsen, Hans

    1974-01-01

    Coupling between minimum scattering antennas (MSA's) is investigated by the coupling theory developed by Wasylkiwskyj and Kahn. Only rotationally symmetric power patterns are considered, and graphs of relative mutual impedance are presented as a function of distance and pattern parameters. Crossed...

  18. On the minimum circulating power of steady state tokamaks

    International Nuclear Information System (INIS)

    Itoh, K.; Itoh, S.; Fukuyama, A.; Yagi, M.

    1995-07-01

    Circulating power for the sustenance and profile control of the steady state tokamak plasmas is discussed. The simultaneous fulfillment of the MHD stability at high beta value, the improved confinement and the stationary equilibrium requires the rotation drive as well as the current drive. In addition to the current drive efficiency, the efficiency for the rotation drive is investigated. The direct rotation drive by the external torque, such as the case of beam injection, is not efficient enough. The mechanism and the magnitude of the spontaneous plasma rotation are studied. (author)

  19. 18 CFR 35.37 - Market power analysis required.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Market power analysis required. 35.37 Section 35.37 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Wholesale Sales of Electric Energy, Capacity and Ancillary Services at Market-Based Rates § 35.37 Market...

  20. Object-Oriented Economic Power Dispatch of Electrical Power System with minimum pollution using a Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    T. Bouktir

    2005-06-01

    Full Text Available This paper presents solution of optimal power flow (OPF problem of electrical power system via a genetic algorithm of real type. The objective is to minimize the total fuel cost of generation and environmental pollution caused by fossil based thermal generating units and also maintain an acceptable system performance in terms of limits on generator real and reactive power outputs, bus voltages, shunt capacitors/reactors, transformers tap-setting and power flow of transmission lines. CPU times can be reduced by decomposing the optimization constraints to active constraints that affect directly the cost function manipulated directly the GA, and passive constraints such as generator bus voltages and transformer tap setting maintained in their soft limits using a conventional constraint load flow. The algorithm was developed in an Object Oriented fashion, in the C++ programming language. This option satisfies the requirements of flexibility, extensibility, maintainability and data integrity. The economic power dispatch is applied to IEEE 30-bus model system (6-generator, 41-line and 20-load. The numerical results have demonstrate the effectiveness of the stochastic search algorithms because its can provide accurate dispatch solutions with reasonable time. Further analyses indicate that this method is effective for large-scale power systems.

  1. Modeling the minimum enzymatic requirements for optimal cellulose conversion

    International Nuclear Information System (INIS)

    Den Haan, R; Van Zyl, W H; Van Zyl, J M; Harms, T M

    2013-01-01

    Hydrolysis of cellulose is achieved by the synergistic action of endoglucanases, exoglucanases and β-glucosidases. Most cellulolytic microorganisms produce a varied array of these enzymes and the relative roles of the components are not easily defined or quantified. In this study we have used partially purified cellulases produced heterologously in the yeast Saccharomyces cerevisiae to increase our understanding of the roles of some of these components. CBH1 (Cel7), CBH2 (Cel6) and EG2 (Cel5) were separately produced in recombinant yeast strains, allowing their isolation free of any contaminating cellulolytic activity. Binary and ternary mixtures of the enzymes at loadings ranging between 3 and 100 mg g −1 Avicel allowed us to illustrate the relative roles of the enzymes and their levels of synergy. A mathematical model was created to simulate the interactions of these enzymes on crystalline cellulose, under both isolated and synergistic conditions. Laboratory results from the various mixtures at a range of loadings of recombinant enzymes allowed refinement of the mathematical model. The model can further be used to predict the optimal synergistic mixes of the enzymes. This information can subsequently be applied to help to determine the minimum protein requirement for complete hydrolysis of cellulose. Such knowledge will be greatly informative for the design of better enzymatic cocktails or processing organisms for the conversion of cellulosic biomass to commodity products. (letter)

  2. Grid Code Requirements for Wind Power Integration

    DEFF Research Database (Denmark)

    Wu, Qiuwei

    2018-01-01

    This chapter reviews the grid code requirements for integration of wind power plants (WPPs). The grid codes reviewed are from the UK, Ireland, Germany, Denmark, Spain, Sweden, the USA, and Canada. Transmission system operators (TSOs) around the world have specified requirements for WPPs under...

  3. Minimum Requirements for Core Competency in Pediatric Pharmacy Practice.

    Science.gov (United States)

    Boucher, Elizabeth A; Burke, Margaret M; Johnson, Peter N; Klein, Kristin C; Miller, Jamie L

    2015-01-01

    Colleges of pharmacy provide varying amounts of didactic and clinical hours in pediatrics resulting in variability in the knowledge, skills, and perceptions of new graduates toward pediatric pharmaceutical care. The Pediatric Pharmacy Advocacy Group (PPAG) endorses the application of a minimum set of core competencies for all pharmacists involved in the care of hospitalized children.

  4. FLECH PowerMax Service Requirement Specification

    DEFF Research Database (Denmark)

    It is expected that in the future, ancillary services will be required at distribution level. This work describes how one of these ancillary services, the PowerMax service, must be spec ified within a market framework. The basis of this work is the Flexibility Clearing House (FLE CH) platform...... and the Distribution System Operator (DSO) services defined in [1]. The PowerMax service has been further discussed in [2], and this technical report seeks to clarify the implementation details first discussed in that paper. The aim of the PowerMax service it to relieve congestion issue s in the distribution system...... by establishing a maximum power that a cluster of consumer devices may draw from the syste m. The consumers will receive a payment for providing this service, and the DSO will be able to postpone grid reinfo rcement...

  5. International power projections and capital requirements

    International Nuclear Information System (INIS)

    Ann, H.

    1989-01-01

    This work is related to the international power projections and capital requirements of all kinds of energy and the share of electricity. It is also related to the so-called greenhouse effect carbon dioxide concentration in atmosphere. (A.C.A.S.)

  6. Implications of fusion power plant studies for materials requirements

    International Nuclear Information System (INIS)

    Cook, Ian; Ward, David; Dudarev, Sergei

    2002-01-01

    This paper addresses the key requirements for fusion materials, as these have emerged from studies of commercial fusion power plants. The objective of the international fusion programme is the creation of power stations that will have very attractive safety and environmental features and viable economics. Fusion power plant studies have shown that these objectives may be achieved without requiring extreme advances in materials. But it is required that existing candidate materials perform at least as well as envisaged in the environment of fusion neutrons, heat fluxes and particle fluxes. The development of advanced materials would bring further benefits. The work required entails the investigation of many intellectually exciting physics issues of great scientific interest, and of wider application than fusion. In addition to giving an overview, selected aspects of the science, of particular physics interest, are illustrated

  7. Manpower requirements for nuclear power in developing countries

    International Nuclear Information System (INIS)

    Csik, B.J.

    1980-01-01

    It is recognized that each country has its individual unique characteristics and that there is no typical or average developing country. Common conditions represent exceptions, rather than the rule. Manpower requirements, however, are created by the tasks to be performed and activities to be carried out at each definite stage of a nuclear power project or programme. These tasks and activities, as well as the manpower requirements they create, are of a similar nature for any country, subject to the influence of prevailing local conditions. First, successive stages of the evolution of a nuclear power programme are defined. These are: pre-planning, planning, study and procurement, construction, operation of the first plant, confirmed and self-sufficient in implementing nuclear power projects. The developing countries are then classified according to the present stage of their evolution. Finally, the present and future manpower requirements of each country or group of countries are estimated. No attempt has been made to try to establish any precise data for any country in particular. The results obtained are global estimates, intended as indications of trends and of orders of magnitude. It is found that the developing world's present manpower requirements for nuclear power are of the order of 100,000 people, of which about 20,000 need specialized nuclear training. By the year 2000, for an installed nuclear capacity of 150 to 200 GW, overall manpower requirements should increase to more than 500,000 which would include 130,000 with specialized nuclear training. (author)

  8. National Maglev initiative: California line electric utility power system requirements

    Science.gov (United States)

    Save, Phil

    1994-01-01

    The electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.

  9. Minimum requirements for predictive pore-network modeling of solute transport in micromodels

    Science.gov (United States)

    Mehmani, Yashar; Tchelepi, Hamdi A.

    2017-10-01

    Pore-scale models are now an integral part of analyzing fluid dynamics in porous materials (e.g., rocks, soils, fuel cells). Pore network models (PNM) are particularly attractive due to their computational efficiency. However, quantitative predictions with PNM have not always been successful. We focus on single-phase transport of a passive tracer under advection-dominated regimes and compare PNM with high-fidelity direct numerical simulations (DNS) for a range of micromodel heterogeneities. We identify the minimum requirements for predictive PNM of transport. They are: (a) flow-based network extraction, i.e., discretizing the pore space based on the underlying velocity field, (b) a Lagrangian (particle tracking) simulation framework, and (c) accurate transfer of particles from one pore throat to the next. We develop novel network extraction and particle tracking PNM methods that meet these requirements. Moreover, we show that certain established PNM practices in the literature can result in first-order errors in modeling advection-dominated transport. They include: all Eulerian PNMs, networks extracted based on geometric metrics only, and flux-based nodal transfer probabilities. Preliminary results for a 3D sphere pack are also presented. The simulation inputs for this work are made public to serve as a benchmark for the research community.

  10. Space nuclear power requirements for ozone layer modification

    International Nuclear Information System (INIS)

    Dolan, T.J.

    1991-01-01

    This work estimates the power requirements for using photochemical processes driven by space nuclear power to counteract the Earth's ozone layer depletion. The total quantity of ozone (O 3 ) in the Earth's atmosphere is estimated to be about 4.7 x 10 37 molecules. The ozone production and destruction rates in the stratosphere are both on the order of 4.9 x 10 31 molecules/s, differing by a small fraction so that the net depletion rate is about 0.16 to 0.26% per year. The delivered optical power requirement for offsetting this depletion is estimated to be on the order of 3 GW. If the power were produced by satellite reactors at 800 km altitude (orbit decay time ∼ 300 years), some means of efficient power beaming would be needed to deliver the power to stratospheric levels (10--50 km). Ultraviolet radiation at 140--150 nm could have higher absorption rates in O 2 (leading to production of atomic oxygen, which can combine with O 2 to form O 3 ) than in ozone (leading to photodissociation of O 3 ). Potential radiation sources include H 2 lasers and direct nuclear pumping of ultraviolet fluorescers. 5 refs

  11. Benchmarking the minimum Electron Beam (eBeam) dose required for the sterilization of space foods

    Science.gov (United States)

    Bhatia, Sohini S.; Wall, Kayley R.; Kerth, Chris R.; Pillai, Suresh D.

    2018-02-01

    As manned space missions extend in length, the safety, nutrition, acceptability, and shelf life of space foods are of paramount importance to NASA. Since food and mealtimes play a key role in reducing stress and boredom of prolonged missions, the quality of food in terms of appearance, flavor, texture, and aroma can have significant psychological ramifications on astronaut performance. The FDA, which oversees space foods, currently requires a minimum dose of 44 kGy for irradiated space foods. The underlying hypothesis was that commercial sterility of space foods could be achieved at a significantly lower dose, and this lowered dose would positively affect the shelf life of the product. Electron beam processed beef fajitas were used as an example NASA space food to benchmark the minimum eBeam dose required for sterility. A 15 kGy dose was able to achieve an approximately 10 log reduction in Shiga-toxin-producing Escherichia coli bacteria, and a 5 log reduction in Clostridium sporogenes spores. Furthermore, accelerated shelf life testing (ASLT) to determine sensory and quality characteristics under various conditions was conducted. Using Multidimensional gas-chromatography-olfactometry-mass spectrometry (MDGC-O-MS), numerous volatiles were shown to be dependent on the dose applied to the product. Furthermore, concentrations of off -flavor aroma compounds such as dimethyl sulfide were decreased at the reduced 15 kGy dose. The results suggest that the combination of conventional cooking combined with eBeam processing (15 kGy) can achieve the safety and shelf-life objectives needed for long duration space-foods.

  12. Effect of dc-power-system reliability on reactor-shutdown cooling

    International Nuclear Information System (INIS)

    Kolaczkowski, A.M.; Baranowsky, P.W.; Hickman, J.W.

    1981-01-01

    The DC power systems in a nuclear power plant provide control and motive power to valves, instrumentation, emergency diesel generators, and many other components and systems during all phases of plant operation including abnormal shutdowns and accident situations. A specific area of concern is the adequacy of the minimum design requirements for DC power systems, particularly with regard to multiple and common cause failures. This concern relates to the application of the single failure criterion for assuring a reliable DC power supply which may be required for the functionability of shutdown cooling systems. The results are presented of a reliability based study performed to assess the adequacy of DC power supply design requirements for currently operating light water reactors with particular attention to shutdown cooling requirements

  13. Nuclear space power and propulsion requirements and issues

    International Nuclear Information System (INIS)

    Swerdling, M.; Isenberg, L.

    1995-01-01

    The use of nuclear power in space is going through a low point. The kinds of missions that would use nuclear power are expensive and there are few new expensive missions. Both NASA and DoD are in a mode of cheaper, faster, better, which means using what is available as much as possible and only incorporating new technology to reduce mission cost. NASA is performing Mission to Planet Earth and detailed exploration missions of Mars. These NASA missions can be done with solar-battery power subsystems and there is no need for nuclear power. The NASA mission to Pluto does require nuclear radioisotope power. Ways to reduce the power subsystem cost and the power level are being investigated. NASA is studying ways to explore beyond Mars with solar-battery power because of the cost and uncertainty in the availability and launchability of nuclear space power systems. The DoD missions are all in earth orbit and can be done with solar-battery systems. The major DoD requirement at present is to reduce costs of all their space missions. One way to do this is to develop highly efficient upper stage boosters that can be integrated with lower cost Earth to low orbit stages and still place their payloads in to higher orbits. One attractive upper stage is a nuclear bimodal (propulsion and power) engine to accomplished lower booster cost to place space assets in GEO. However this is not being pursued because of DOE's new policy not to fund nuclear space power research and development as well as the difficulty in obtaining launch approval for nuclear propulsion and power systems

  14. radiation safety culture for developing country: Basis for s minimum operational radiation protection programme

    International Nuclear Information System (INIS)

    Rozental, J. J.

    1997-01-01

    The purpose of this document is to present a methodology for an integrated strategy aiming at establishing an adequate radiation Safety infrastructure for developing countries, non major power reactor programme. Its implementation will allow these countries, about 50% of the IAEA's Member States, to improve marginal radiation safety, specially to those recipients of technical assistance and do not meet the Minimum radiation Safety Requirements of the IAEA's Basic Safety Standards for radiation protection Progress in the implementation of safety regulations depends on the priority of the government and its understanding and conviction about the basic requirements for protection against the risks associated with exposure to ionizing radiation. There is no doubt to conclude that the reasons for the deficiency of sources control and dose limitation are related to the lack of an appropriate legal and regulatory framework, specially considering the establishment of an adequate legislation; A minimum legal infrastructure; A minimum operational radiation safety programme; Alternatives for a Point of Optimum Contact, to avoid overlap and conflict, that is: A 'Memorandum of Understanding' among Regulatory Authorities in the Country, dealing with similar type of licensing and inspection

  15. Reduced power processor requirements for the 30-cm diameter HG ion thruster

    Science.gov (United States)

    Rawlin, V. K.

    1979-01-01

    The characteristics of power processors strongly impact the overall performance and cost of electric propulsion systems. A program was initiated to evaluate simplifications of the thruster-power processor interface requirements. The power processor requirements are mission dependent with major differences arising for those missions which require a nearly constant thruster operating point (typical of geocentric and some inbound planetary missions) and those requiring operation over a large range of input power (such as outbound planetary missions). This paper describes the results of tests which have indicated that as many as seven of the twelve power supplies may be eliminated from the present Functional Model Power Processor used with 30-cm diameter Hg ion thrusters.

  16. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Spanish Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-1, Safety of Nuclear Power Plants: Design. It establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in the design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  17. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Russian Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-1, Safety of Nuclear Power Plants: Design. It establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in the design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  18. Nuclear power technology requirements for NASA exploration missions

    International Nuclear Information System (INIS)

    Bloomfield, H.S.

    1990-01-01

    This paper discusses how future exploration of the Moon and Mars will mandate developments in many areas of technology. In particular, major advances will be required in planet surface power systems and space transportation systems. Critical nuclear technology challenges that can enable strategic self-sufficiency, acceptable operational costs and cost-effective space transportation goals for NASA exploration missions have been identified. Critical technologies for surface power systems include stationary and mobile nuclear reactor and radio-isotope heat sources coupled to static and dynamic power conversion devices. These technologies can provide dramatic reductions in mass leading to operational and transportation cost savings. Critical technologies for space transportation systems include nuclear thermal rocket and nuclear electric propulsion options which present compelling concepts for significantly reducing mass, cost or travel time required for Earth-Mars transport

  19. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (French Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This publication establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication.

  20. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Russian Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This publication establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication.

  1. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Arabic Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This publication establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication.

  2. 12 CFR 615.5330 - Minimum surplus ratios.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Minimum surplus ratios. 615.5330 Section 615.5330 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM FUNDING AND FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Surplus and Collateral Requirements § 615.5330 Minimum...

  3. Mission needs and system commonality for space nuclear power and propulsion

    International Nuclear Information System (INIS)

    Buden, D.; Zuppero, A.; Redd, L.

    1993-01-01

    Nuclear power enables or significantly enhances a variety of space missions whether near-Earth, or for solar system exploration, lunar-Mars exploration and recovery of near-Earth resources. Performance optimizations for individual missions leads to a large number of power and propulsion systems to be developed. However, the realities of the budget and schedules indicates that the number of nuclear systems that will be developed are limited. One needs to seek the ''minimum requirements'' to do a job rather than the last ounce of performance, and areas of commonality. To develop a minimum number of systems to meet the overall DoD, NASA, and commercial needs, the broad spectrum of requirements has been examined along with cost drivers

  4. Grid code requirements for wind power generation

    International Nuclear Information System (INIS)

    Djagarov, N.; Filchev, S.; Grozdev, Z.; Bonev, M.

    2011-01-01

    In this paper production data of wind power in Europe and Bulgaria and plans for their development within 2030 are reviewed. The main characteristics of wind generators used in Bulgaria are listed. A review of the grid code in different European countries, which regulate the requirements for renewable sources, is made. European recommendations for requirements harmonization are analyzed. Suggestions for the Bulgarian gird code are made

  5. Finding the Energy Efficient Curve: Gate Sizing for Minimum Power under Delay Constraints

    Directory of Open Access Journals (Sweden)

    Yoni Aizik

    2011-01-01

    Full Text Available A design scenario examined in this paper assumes that a circuit has been designed initially for high speed, and it is redesigned for low power by downsizing of the gates. In recent years, as power consumption has become a dominant issue, new optimizations of circuits are required for saving energy. This is done by trading off some speed in exchange for reduced power. For each feasible speed, an optimization problem is solved in this paper, finding new sizes for the gates such that the circuit satisfies the speed goal while dissipating minimal power. Energy/delay gain (EDG is defined as a metric to quantify the most efficient tradeoff. The EDG of the circuit is evaluated for a range of reduced circuit speeds, and the power-optimal gate sizes are compared with the initial sizes. Most of the energy savings occur at the final stages of the circuits, while the largest relative downsizing occurs in middle stages. Typical tapering factors for power efficient circuits are larger than those for speed-optimal circuits. Signal activity and signal probability affect the optimal gate sizes in the combined optimization of speed and power.

  6. Minimum airflow reset of single-duct VAV terminal boxes

    Science.gov (United States)

    Cho, Young-Hum

    Single duct Variable Air Volume (VAV) systems are currently the most widely used type of HVAC system in the United States. When installing such a system, it is critical to determine the minimum airflow set point of the terminal box, as an optimally selected set point will improve the level of thermal comfort and indoor air quality (IAQ) while at the same time lower overall energy costs. In principle, this minimum rate should be calculated according to the minimum ventilation requirement based on ASHRAE standard 62.1 and maximum heating load of the zone. Several factors must be carefully considered when calculating this minimum rate. Terminal boxes with conventional control sequences may result in occupant discomfort and energy waste. If the minimum rate of airflow is set too high, the AHUs will consume excess fan power, and the terminal boxes may cause significant simultaneous room heating and cooling. At the same time, a rate that is too low will result in poor air circulation and indoor air quality in the air-conditioned space. Currently, many scholars are investigating how to change the algorithm of the advanced VAV terminal box controller without retrofitting. Some of these controllers have been found to effectively improve thermal comfort, indoor air quality, and energy efficiency. However, minimum airflow set points have not yet been identified, nor has controller performance been verified in confirmed studies. In this study, control algorithms were developed that automatically identify and reset terminal box minimum airflow set points, thereby improving indoor air quality and thermal comfort levels, and reducing the overall rate of energy consumption. A theoretical analysis of the optimal minimum airflow and discharge air temperature was performed to identify the potential energy benefits of resetting the terminal box minimum airflow set points. Applicable control algorithms for calculating the ideal values for the minimum airflow reset were developed and

  7. Safety and regulatory requirements of nuclear power plants

    International Nuclear Information System (INIS)

    Kumar, S.V.; Bhardwaj, S.A.

    2000-01-01

    A pre-requisite for a nuclear power program in any country is well established national safety and regulatory requirements. These have evolved for nuclear power plants in India with participation of the regulatory body, utility, research and development (R and D) organizations and educational institutions. Prevailing international practices provided a useful base to develop those applicable to specific system designs for nuclear power plants in India. Their effectiveness has been demonstrated in planned activities of building up the nuclear power program as well as with unplanned activities, like those due to safety related incidents etc. (author)

  8. 18 CFR 284.504 - Standard requirements for market-power authorizations.

    Science.gov (United States)

    2010-04-01

    ... Commission within 10 days of acquiring knowledge of significant changes occurring in its market power status... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Standard requirements for market-power authorizations. 284.504 Section 284.504 Conservation of Power and Water Resources...

  9. Power system requirements and selection for the space exploration initiative

    International Nuclear Information System (INIS)

    Biringer, K.L.; Bartine, D.E.; Buden, D.; Foreman, J.; Harrison, S.

    1991-01-01

    The Space Exploration Initiative (SEI) seeks to reestablish a US program of manned and unmanned space exploration. The President has called for a program which includes a space station element, a manned habitation of the moon, and a human exploration of Mars. The NASA Synthesis Group has developed four significantly different architectures for the SEI program. One key element of a space exploration effort is the power required to support the missions. The Power Speciality Team of the Synthesis Group was tasked with assessing and evaluating the power requirements and candidate power technologies for such missions. Inputs to the effort came from existing NASA studies as well as other governments agency inputs such as those from DOD and DOE. In addition, there were industry and university briefings and results of solicitations from the AIAA and the general public as part of the NASA outreach effort. Because of the variety of power needs in the SEI program, there will be a need for multiple power system technologies including solar, nuclear and electrochemical. Due to the high rocket masses required to propel payloads to the moon and beyond to Mars, there is great emphasis placed on the need for high power density and high energy density systems. Power system technology development work is needed results will determine the ultimate technology selections. 23 refs., 10 figs

  10. Voltage scheduling for low power/energy

    Science.gov (United States)

    Manzak, Ali

    2001-07-01

    Power considerations have become an increasingly dominant factor in the design of both portable and desk-top systems. An effective way to reduce power consumption is to lower the supply voltage since voltage is quadratically related to power. This dissertation considers the problem of lowering the supply voltage at (i) the system level and at (ii) the behavioral level. At the system level, the voltage of the variable voltage processor is dynamically changed with the work load. Processors with limited sized buffers as well as those with very large buffers are considered. Given the task arrival times, deadline times, execution times, periods and switching activities, task scheduling algorithms that minimize energy or peak power are developed for the processors equipped with very large buffers. A relation between the operating voltages of the tasks for minimum energy/power is determined using the Lagrange multiplier method, and an iterative algorithm that utilizes this relation is developed. Experimental results show that the voltage assignment obtained by the proposed algorithm is very close (0.1% error) to that of the optimal energy assignment and the optimal peak power (1% error) assignment. Next, on-line and off-fine minimum energy task scheduling algorithms are developed for processors with limited sized buffers. These algorithms have polynomial time complexity and present optimal (off-line) and close-to-optimal (on-line) solutions. A procedure to calculate the minimum buffer size given information about the size of the task (maximum, minimum), execution time (best case, worst case) and deadlines is also presented. At the behavioral level, resources operating at multiple voltages are used to minimize power while maintaining the throughput. Such a scheme has the advantage of allowing modules on the critical paths to be assigned to the highest voltage levels (thus meeting the required timing constraints) while allowing modules on non-critical paths to be assigned

  11. Radiation therapists' perceptions of the minimum level of experience required to perform portal image analysis

    International Nuclear Information System (INIS)

    Rybovic, Michala; Halkett, Georgia K.; Banati, Richard B.; Cox, Jennifer

    2008-01-01

    Background and purpose: Our aim was to explore radiation therapists' views on the level of experience necessary to undertake portal image analysis and clinical decision making. Materials and methods: A questionnaire was developed to determine the availability of portal imaging equipment in Australia and New Zealand. We analysed radiation therapists' responses to a specific question regarding their opinion on the minimum level of experience required for health professionals to analyse portal images. We used grounded theory and a constant comparative method of data analysis to derive the main themes. Results: Forty-six radiation oncology facilities were represented in our survey, with 40 questionnaires being returned (87%). Thirty-seven radiation therapists answered our free-text question. Radiation therapists indicated three main themes which they felt were important in determining the minimum level of experience: 'gaining on-the-job experience', 'receiving training' and 'working as a team'. Conclusions: Radiation therapists indicated that competence in portal image review occurs via various learning mechanisms. Further research is warranted to determine perspectives of other health professionals, such as radiation oncologists, on portal image review becoming part of radiation therapists' extended role. Suitable training programs and steps for implementation should be developed to facilitate this endeavour

  12. Defence in depth for electric power supplies in Indian nuclear power plants

    International Nuclear Information System (INIS)

    Gupta, S.K.; Srivasista, K.; Solanki, R.B.

    2009-01-01

    The purpose of electric power supply system in a nuclear power plant is to supply and distribute reliable electric power to safety related systems and systems important to safety in various forms, arrangements and combinations of redundancy and diversity in order to perform safety functions required during operational states and design basis events (DBE) such as shutting down the reactor, maintaining the reactor in safe shutdown state, containment isolation and reactor core cooling preventing significant release of radioactive material to the environment. Hence the design basis of electric power supply systems includes identification of DBE that require power supplies, adequacy of redundancy and diversity, environmental conditions to which electric equipment are qualified, identification of loads requiring interrupted and uninterrupted power supplies, time sequence in which emergency loads are to be supplied in case of interruption, provisions for maintaining and testing, consideration for minimum duration capability of emergency power supplies during station blackout etc. Based on operation experience, results of probability safety assessment and certain weaknesses noticed in defence in depth of electric power supply systems, several continuous design improvements have been made in Indian nuclear power plants during operating phase and life extension. Instituting various tests during initial commissioning, subsequent operation and life extension has ensured high standards of performance of electric power supplies. Some of these aspects are highlighted in this paper

  13. Requirements Specication for Ampliers and Power Supplies in Active Loudspeakers

    DEFF Research Database (Denmark)

    Schneider, Henrik; Jensen, Lasse Crone; Petersen, Lars Press

    2014-01-01

    This work aims to provide designers with a method to develop a requirements specication for power supplies and ampliers in active loudspeakers. The motivation is to avoid over-sizing and unnecessary cost. A realistic estimation of the power supplied during playback of audio in a given loudspeaker...... is obtained by considering a wide range of audio source material, loudness normalization of the source material, crossover ltering, driver characteristics as well as a perceived maximum loudness/volume level. The results from analysing a sub-woofer and a woofer reveals the peak power, peak voltage, peak...... current and apparent power - thus providing a solid foundation for a requirement specication....

  14. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Chinese Ed.)

    International Nuclear Information System (INIS)

    2012-01-01

    On the basis of the principles included in the Fundamental Safety Principles, IAEA Safety Standards Series No. SF-1, this Safety Requirements publication establishes requirements applicable to the design of nuclear power plants. It covers the design phase and provides input for the safe operation of the power plant. It elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  15. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (French Ed.)

    International Nuclear Information System (INIS)

    2012-01-01

    On the basis of the principles included in the Fundamental Safety Principles, IAEA Safety Standards Series No. SF-1, this Safety Requirements publication establishes requirements applicable to the design of nuclear power plants. It covers the design phase and provides input for the safe operation of the power plant. It elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  16. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Arabic Ed.)

    International Nuclear Information System (INIS)

    2012-01-01

    On the basis of the principles included in the Fundamental Safety Principles, IAEA Safety Standards Series No. SF-1, this Safety Requirements publication establishes requirements applicable to the design of nuclear power plants. It covers the design phase and provides input for the safe operation of the power plant. It elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  17. Neutronics requirements for a DEMO fusion power plant

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, U., E-mail: ulrich.fischer@kit.edu [Karlsruhe Institute of Technology (KIT), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Bachmann, C. [EUROfusion Consortium , Boltzmannstraße 2, 85748 Garching (Germany); Palermo, I. [Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas (CIEMAT), Madrid (Spain); Pereslavtsev, P. [Karlsruhe Institute of Technology (KIT), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Villari, R. [ENEA UT-FUS C.R. Frascati, Via E. Fermi 45, 00044 Frascati (Italy)

    2015-10-15

    Highlights: • Discussion and specification of neutronic requirements for a DEMO power plant. • TBR uncertainties are reviewed/discussed and design margins are elaborated. • Limits are given for radiation loads to super-conducting magnets and steel structural components. • Available DEMO results are compared to recommended limits and TBR design target. - Abstract: This paper addresses the neutronic requirements a DEMO fusion power plant needs to fulfil for a reliable and safe operation. The major requirement is to ensure Tritium self-sufficiency taking into account the various uncertainties and plant-internal losses that occur during DEMO operation. A further major requirement is to ensure sufficient protection of the superconducting magnets against the radiation penetrating in-vessel components and vessel. Reliable criteria for the radiation loads need to be defined and verified to ensure the reliable operation of the magnets over the lifetime of DEMO. Other issues include radiation induced effects on structural materials such as the accumulated displacement damage, the generation of gases such as helium which may deteriorate the material performance. The paper discusses these issues and their impact on design options for DEMO taking into account results obtained in the frame of European Power Plant Physics and Technology (PPPT) 2013 programme activities with DEMO models employing the helium cooled pebble bed (HCPB), the helium cooled lithium lead (HCLL), and the water-cooled (WCLL) blanket concepts.

  18. 24 CFR 891.145 - Owner deposit (Minimum Capital Investment).

    Science.gov (United States)

    2010-04-01

    ... General Program Requirements § 891.145 Owner deposit (Minimum Capital Investment). As a Minimum Capital... Investment shall be one-half of one percent (0.5%) of the HUD-approved capital advance, not to exceed $25,000. ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Owner deposit (Minimum Capital...

  19. Use of fuel cells to meet military requirements for mobile power

    International Nuclear Information System (INIS)

    Andrukaitis, E.

    2004-01-01

    'Full text:' The use of fuel cell technology in military applications will depend on safe, high energy density systems being developed. An important part of using this technology is also the development of alternative hydrogen producing fuels with high energy densities and are easy to transport. Fuel cells are now a very large R and D effort for several military applications around the world. The major reason is because of the high power demands needed requires electrical energy sources that far exceed the capabilities of batteries currently being fielded for portable applications. Fuel cells are regarded as highly efficient, tactical energy converters that can be adapted for wide range of power requirements. They are potentially the lowest weight power source when coupled with batteries or capacitors to form hybrid systems. Generally electrical power is needed to support a number of applications from ultra-high power for electrical pulses (radios, sensors) to reliable, conditioned power for command and control systems. In the future, sustained power for electric drive systems, will also be required. Some of the promising applications in the military and the R and D challenges that remain to reach performance and reliability targets suitable for military requirements will be discussed. (author)

  20. Power requirements assessment for lunar and Mars scientific and experimental payloads

    International Nuclear Information System (INIS)

    Kotas, J.F.

    1992-01-01

    This paper reports on an evaluation of prospective scientific payloads and surface experiments for future manned missions to the moon and Mars which determined that overall mission objectives and requirements influence the selection of candidate power systems. A generic classification of these science missions was developed to examine these relationships. Scientific missions were defined for the four Synthesis Report architectures and cumulative power load and payload mix computed. Approximately half of all deployed science payloads were sited within the main surface outpost and powered by the central power generation facility. The remaining remote science payloads require either autonomous or smaller central power facilities

  1. 12 CFR 931.3 - Minimum investment in capital stock.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Minimum investment in capital stock. 931.3... CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL STOCK § 931.3 Minimum investment in capital stock. (a) A Bank shall require each member to maintain a minimum investment in the capital stock of the Bank, both...

  2. Link lengths and their growth powers

    International Nuclear Information System (INIS)

    Huh, Youngsik; No, Sungjong; Oh, Seungsang; Rawdon, Eric J

    2015-01-01

    For a certain infinite family F of knots or links, we study the growth power ratios of their stick number, lattice stick number, minimum lattice length and minimum ropelength compared with their minimum crossing number c(K) for every K∈F. It is known that the stick number and lattice stick number grow between the (1/2) and linear power of the crossing number, and minimum lattice length and minimum ropelength grow with at least the (3/4) power of crossing number (which is called the four-thirds power law). Furthermore, the minimal lattice length and minimum ropelength grow at most as O (c(K)[ln(c(K))] 5 ), but it is unknown whether any family exhibits superlinear growth. For any real number r between (1/2) and 1, we give an infinite family of non-splittable prime links in which the stick number and lattice stick number grow exactly as the rth power of crossing number. Furthermore for any real number r between (3/4) and 1, we give another infinite family of non-splittable prime links in which the minimum lattice length and minimum ropelength grow exactly as the rth power of crossing number. (paper)

  3. 10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.

    Science.gov (United States)

    2010-01-01

    ... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license... 10 Energy 2 2010-01-01 2010-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF...

  4. Minimum qualifications for nuclear criticality safety professionals

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1990-01-01

    A Nuclear Criticality Technology and Safety Training Committee has been established within the U.S. Department of Energy (DOE) Nuclear Criticality Safety and Technology Project to review and, if necessary, develop standards for the training of personnel involved in nuclear criticality safety (NCS). The committee is exploring the need for developing a standard or other mechanism for establishing minimum qualifications for NCS professionals. The development of standards and regulatory guides for nuclear power plant personnel may serve as a guide in developing the minimum qualifications for NCS professionals

  5. MINIMUM BRACING STIFFNESS FOR MULTI-COLUMN SYSTEMS: THEORY

    OpenAIRE

    ARISTIZÁBAL-OCHOA, J. DARÍO

    2011-01-01

    A method that determines the minimum bracing stiffness required by a multi-column elastic system to achieve non-sway buckling conditions is proposed. Equations that evaluate the required minimum stiffness of the lateral and torsional bracings and the corresponding “braced" critical buckling load for each column of the story level are derived using the modified stability functions. The following effects are included: 1) the types of end connections (rigid, semirigid, and simple); 2) the bluepr...

  6. Fire protection in power plants

    International Nuclear Information System (INIS)

    Penot, J.

    1986-01-01

    Graphex-CK 23 is a unique sodium fire extinction product. Minimum amounts of powder are required for very fast action. The sodium can be put to use again, when the fire has been extinguished. It can be applied in other industrial branches and with other metals, e.g. sodium/potassium circuits or lithium coolant in power plants. [de

  7. Ring power balance observing plasma stability constraints

    International Nuclear Information System (INIS)

    Campbell, R.B.; Logan, B.G.

    1982-01-01

    Ring power balance is performed for an E-ring stabilized tandem mirror reactor, taking into account constraints imposed by plasma stability. The two most important criteria are the stability of the core interchange and hot electron interchange modes. The former determines the ring thickness, the latter determines the minimum hot electron temperature; both quantities are important for power balance. The combination of the hot electron interchange constraint and the fact that the barrier density is low places the operating point on the synchrotron dominated branch of power balance. The reference case considered here requires a reasonable 34 MW of heating power deposited in the rings. We also have examined the sensitivity of the required ring power on uncertainties in the numerical coefficients of the stability constraints. We have found that the heating power is strongly affected

  8. Minimum energy requirements for desalination of brackish groundwater in the United States with comparison to international datasets

    Science.gov (United States)

    Ahdab, Yvana D.; Thiel, Gregory P.; Böhlke, John Karl; Stanton, Jennifer S.; Lienhard, John H.

    2018-01-01

    This paper uses chemical and physical data from a large 2017 U.S. Geological Surveygroundwater dataset with wells in the U.S. and three smaller international groundwater datasets with wells primarily in Australia and Spain to carry out a comprehensive investigation of brackish groundwater composition in relation to minimum desalinationenergy costs. First, we compute the site-specific least work required for groundwater desalination. Least work of separation represents a baseline for specific energy consumptionof desalination systems. We develop simplified equations based on the U.S. data for least work as a function of water recovery ratio and a proxy variable for composition, either total dissolved solids, specific conductance, molality or ionic strength. We show that the U.S. correlations for total dissolved solids and molality may be applied to the international datasets. We find that total molality can be used to calculate the least work of dilute solutions with very high accuracy. Then, we examine the effects of groundwater solute composition on minimum energy requirements, showing that separation requirements increase from calcium to sodium for cations and from sulfate to bicarbonate to chloride for anions, for any given TDS concentration. We study the geographic distribution of least work, total dissolved solids, and major ions concentration across the U.S. We determine areas with both low least work and high water stress in order to highlight regions holding potential for desalination to decrease the disparity between high water demand and low water supply. Finally, we discuss the implications of the USGS results on water resource planning, by comparing least work to the specific energy consumption of brackish water reverse osmosisplants and showing the scaling propensity of major electrolytes and silica in the U.S. groundwater samples.

  9. Minimum Lateral Bone Coverage Required for Securing Fixation of Cementless Acetabular Components in Hip Dysplasia

    Directory of Open Access Journals (Sweden)

    Masanori Fujii

    2017-01-01

    Full Text Available Objectives. To determine the minimum lateral bone coverage required for securing stable fixation of the porous-coated acetabular components (cups in hip dysplasia. Methods. In total, 215 primary total hip arthroplasties in 199 patients were reviewed. The average follow-up period was 49 months (range: 24–77 months. The lateral bone coverage of the cups was assessed by determining the cup center-edge (cup-CE angle and the bone coverage index (BCI from anteroposterior pelvic radiographs. Further, cup fixation was determined using the modified DeLee and Charnley classification system. Results. All cups were judged to show stable fixation by bone ingrowth. The cup-CE angle was less than 0° in 7 hips (3.3% and the minimum cup-CE angle was −9.2° (BCI: 48.8%. Thin radiolucent lines were observed in 5 hips (2.3%, which were not associated with decreased lateral bone coverage. Loosening, osteolysis, dislocation, or revision was not observed in any of the cases during the follow-up period. Conclusion. A cup-CE angle greater than −10° (BCI > 50% was acceptable for stable bony fixation of the cup. Considering possible errors in manual implantation, we recommend that the cup position be planned such that the cup-CE angle is greater than 0° (BCI > 60%.

  10. International comparison of requirements for connection of wind turbines to power systems

    Energy Technology Data Exchange (ETDEWEB)

    Jauch, C. [Risoe National Lab., Roskilde (Denmark). Dept. of Wind Energy; Matevosyan, J.; Ackermann, T. [Royal Inst. of Technology, Stockholm (Sweden). Dept. of Electrical Engineering; Bolik, S. [Vestas Wind Systems A/S, Ringkoebing (Denmark)

    2005-07-01

    Power production from wind turbines has increased considerably during the last decade. Therefore today's wind turbines, which are typically set up in wind farms, have a significant influence on the operation of power systems. The efficient and secure operation of power systems is supported by grid codes, which are sets of requirements for all network users (suppliers, customers, etc.). In Europe, several transmission network operators have introduced special grid connection requirements for wind farms. These requirements are mainly based on existing grid codes, initially written for conventional power plants usually equipped with synchronous generators. This article presents a comparison of grid connection requirements for wind farms issued, or proposed as a draft, by transmission network operators in Denmark, Sweden, Germany, Scotland and Ireland. (author)

  11. A novel minimum cost maximum power algorithm for future smart home energy management.

    Science.gov (United States)

    Singaravelan, A; Kowsalya, M

    2017-11-01

    With the latest development of smart grid technology, the energy management system can be efficiently implemented at consumer premises. In this paper, an energy management system with wireless communication and smart meter are designed for scheduling the electric home appliances efficiently with an aim of reducing the cost and peak demand. For an efficient scheduling scheme, the appliances are classified into two types: uninterruptible and interruptible appliances. The problem formulation was constructed based on the practical constraints that make the proposed algorithm cope up with the real-time situation. The formulated problem was identified as Mixed Integer Linear Programming (MILP) problem, so this problem was solved by a step-wise approach. This paper proposes a novel Minimum Cost Maximum Power (MCMP) algorithm to solve the formulated problem. The proposed algorithm was simulated with input data available in the existing method. For validating the proposed MCMP algorithm, results were compared with the existing method. The compared results prove that the proposed algorithm efficiently reduces the consumer electricity consumption cost and peak demand to optimum level with 100% task completion without sacrificing the consumer comfort.

  12. Energy Storage Requirements for PV Power Ramp Rate Control in Northern Europe

    Directory of Open Access Journals (Sweden)

    Julius Schnabel

    2016-01-01

    Full Text Available Photovoltaic (PV generators suffer from fluctuating output power due to the highly fluctuating primary energy source. With significant PV penetration, these fluctuations can lead to power system instability and power quality problems. The use of energy storage systems as fluctuation compensators has been proposed as means to mitigate these problems. In this paper, the behavior of PV power fluctuations in Northern European climatic conditions and requirements for sizing the energy storage systems to compensate them have been investigated and compared to similar studies done in Southern European climate. These investigations have been performed through simulations that utilize measurements from the Tampere University of Technology solar PV power station research plant in Finland. An enhanced energy storage charging control strategy has been developed and tested. Energy storage capacity, power, and cycling requirements have been derived for different PV generator sizes and power ramp rate requirements. The developed control strategy leads to lesser performance requirements for the energy storage systems compared to the methods presented earlier. Further, some differences on the operation of PV generators in Northern and Southern European climates have been detected.

  13. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2016-01-01

    This publication describes the requirements to be met to ensure the safe operation of nuclear power plants. It takes into account developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication

  14. Current trends in codal requirements for safety in operation of nuclear power plants

    International Nuclear Information System (INIS)

    Srivasista, K.; Shah, Y.K.; Gupta, S.K.

    2006-01-01

    The Code of practice on safety in nuclear power plant operation states the requirements to be met during operation of a nuclear power plant for assuring safety. Among various stages of authorization, regulatory body issues authorization for operation of a nuclear power plant, monitors and enforces regulatory requirements. The responsible organization shall have overall responsibility and the plant management shall have the primary responsibility for ensuring safe and efficient operation of its nuclear power plants. A set of codal requirements covering technical and administrative aspects are mandatory for the plant management to implement to ensure that the nuclear power plant is operated in accordance with the design intent. Requirements on operating procedures and instructions establish operation and maintenance, inspection and testing of the plant in a planned and systematic way. The requirements on emergency preparedness programme establish with a reasonable assurance that, in the event of an emergency situation, appropriate measures can be taken to mitigate the consequences. Commissioning requirements verify performance criteria during commissioning to ensure that the design intent and QA requirements are met. Several modifications in systems important to safety required during operation of a nuclear power plant are regulated. However new operational codal requirements arising out of periodic safety review, operational experience feedback, life management, probabilistic safety assessment, physical security, safety convention and obligations and decommissioning are not covered in the present code of practice for safety in nuclear power plant operation. Codal provisions on 'Review by operating organization on aspects of design having implications on operability' are also required to be addressed. The merits in developing such a methodology include acceptance of the design by operating organization, ensuring maintainability, proper layout etc. in the new designs

  15. 42 CFR 422.382 - Minimum net worth amount.

    Science.gov (United States)

    2010-10-01

    ... that CMS considers appropriate to reduce, control or eliminate start-up administrative costs. (b) After... section. (c) Calculation of the minimum net worth amount—(1) Cash requirement. (i) At the time of application, the organization must maintain at least $750,000 of the minimum net worth amount in cash or cash...

  16. Estimates of power requirements for a Manned Mars Rover powered by a nuclear reactor

    Science.gov (United States)

    Morley, Nicholas J.; El-Genk, Mohamed S.; Cataldo, Robert; Bloomfield, Harvey

    1991-01-01

    This paper assesses the power requirement for a Manned Mars Rover vehicle. Auxiliary power needs are fulfilled using a hybrid solar photovoltaic/regenerative fuel cell system, while the primary power needs are meet using an SP-100 type reactor. The primary electric power needs, which include 30-kW(e) net user power, depend on the reactor thermal power and the efficiency of the power conversion system. Results show that an SP-100 type reactor coupled to a Free Piston Stirling Engine yields the lowest total vehicle mass and lowest specific mass for the power system. The second lowest mass was for a SP-100 reactor coupled to a Closed Brayton Cycle using He/Xe as the working fluid. The specific mass of the nuclear reactor power system, including a man-rated radiation shield, ranged from 150-kg/kW(e) to 190-kg/KW(e) and the total mass of the Rover vehicle varied depend upon the cruising speed.

  17. Requirements for a minimum standard of care for phenylketonuria: the patients’ perspective

    Science.gov (United States)

    2013-01-01

    Phenylketonuria (PKU, ORPHA716) is an inherited disorder that affects about one in every 10,000 children born in Europe. Early and continuous application of a modified diet is largely successful in preventing the devastating brain damage associated with untreated PKU. The management of PKU is inconsistent: there are few national guidelines, and these tend to be incomplete and implemented sporadically. In this article, the first-ever pan- European patient/carer perspective on optimal PKU care, the European Society for Phenylketonuria and Allied Disorders (E.S.PKU) proposes recommendations for a minimum standard of care for PKU, to underpin the development of new pan-European guideline for the management of PKU. New standards of best practice should guarantee equal access to screening, treatment and monitoring throughout Europe. Screening protocols and interpretation of screening results should be standardised. Experienced Centres of Expertise are required, in line with current European Union policy, to guarantee a defined standard of multidisciplinary treatment and care for all medical and social aspects of PKU. Women of childbearing age require especially intensive management, due to the risk of severe risks to the foetus conferred by uncontrolled PKU. All aspects of treatment should be reimbursed to ensure uniform access across Europe to guideline-driven, evidence-based care. The E.S.PKU urges PKU healthcare professionals caring for people with PKU to take the lead in developing evidence based guidelines on PKU, while continuing to play an active role in serving as the voice of patients and their families, whose lives are affected by the condition. PMID:24341788

  18. Defining the minimum anatomical coverage required to protect the axilla and arm against penetrating ballistic projectiles.

    Science.gov (United States)

    Breeze, Johno; Fryer, R; Lewis, E A; Clasper, J

    2016-08-01

    Defining the minimum anatomical structural coverage required to protect from ballistic threats is necessary to enable objective comparisons between body armour designs. Current protection for the axilla and arm is in the form of brassards, but no evidence exists to justify the coverage that should be provided by them. A systematic review was undertaken to ascertain which anatomical components within the arm or axilla would be highly likely to lead to either death within 60 min or would cause significant long-term morbidity. Haemorrhage from vascular damage to the axillary or brachial vessels was demonstrated to be the principal cause of mortality from arm trauma on combat operations. Peripheral nerve injuries are the primary cause of long-term morbidity and functional disability following upper extremity arterial trauma. Haemorrhage is managed through direct pressure and the application of a tourniquet. It is therefore recommended that the minimum coverage should be the most proximal extent to which a tourniquet can be applied. Superimposition of OSPREY brassards over these identified anatomical structures demonstrates that current coverage provided by the brassards could potentially be reduced. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  19. Radiation therapists' perceptions of the minimum level of experience required to perform portal image analysis

    Energy Technology Data Exchange (ETDEWEB)

    Rybovic, Michala [Discipline of Medical Radiation Sciences, Faculty of Health Sciences, University of Sydney, PO Box 170, Lidcombe, NSW 1825 (Australia)], E-mail: mryb6983@mail.usyd.edu.au; Halkett, Georgia K. [Western Australia Centre for Cancer and Palliative Care, Curtin University of Technology, Health Research Campus, GPO Box U1987, Perth, WA 6845 (Australia)], E-mail: g.halkett@curtin.edu.au; Banati, Richard B. [Faculty of Health Sciences, Brain and Mind Research Institute - Ramaciotti Centre for Brain Imaging, University of Sydney, PO Box 170, Lidcombe, NSW 1825 (Australia)], E-mail: r.banati@usyd.edu.au; Cox, Jennifer [Discipline of Medical Radiation Sciences, Faculty of Health Sciences, University of Sydney, PO Box 170, Lidcombe, NSW 1825 (Australia)], E-mail: jenny.cox@usyd.edu.au

    2008-11-15

    Background and purpose: Our aim was to explore radiation therapists' views on the level of experience necessary to undertake portal image analysis and clinical decision making. Materials and methods: A questionnaire was developed to determine the availability of portal imaging equipment in Australia and New Zealand. We analysed radiation therapists' responses to a specific question regarding their opinion on the minimum level of experience required for health professionals to analyse portal images. We used grounded theory and a constant comparative method of data analysis to derive the main themes. Results: Forty-six radiation oncology facilities were represented in our survey, with 40 questionnaires being returned (87%). Thirty-seven radiation therapists answered our free-text question. Radiation therapists indicated three main themes which they felt were important in determining the minimum level of experience: 'gaining on-the-job experience', 'receiving training' and 'working as a team'. Conclusions: Radiation therapists indicated that competence in portal image review occurs via various learning mechanisms. Further research is warranted to determine perspectives of other health professionals, such as radiation oncologists, on portal image review becoming part of radiation therapists' extended role. Suitable training programs and steps for implementation should be developed to facilitate this endeavour.

  20. RF Power Requirements for PEFP SRF Cavity Test

    International Nuclear Information System (INIS)

    Kim, Han Sung; Seol, Kyung Tae; Kwon, Hyeok Jung; Cho, Yong Sub

    2011-01-01

    For the future extension of the PEFP (Proton Engineering Frontier Project) Proton linac, preliminary study on the SRF (superconducting radio-frequency) cavity is going on including a five-cell prototype cavity development to confirm the design and fabrication procedures and to check the RF and mechanical properties of a low-beta elliptical cavity. The main parameters of the cavity are like followings. - Frequency: 700 MHz - Operating mode: TM010 pi mode - Cavity type: Elliptical - Geometrical beta: 0.42 - Number of cells: 5 - Accelerating gradient: 8 MV/m - Epeak/Eacc: 3.71 - Bpeak/Eacc: 7.47 mT/(MV/m) - R/Q: 102.3 ohm - Epeak: 29.68 MV/m (1.21 Kilp.) - Geometrical factor: 121.68 ohm - Cavity wall thickness: 4.3 mm - Stiffening structure: Double ring - Effective length: 0.45 m For the test of the cavity at low temperature of 4.2 K, many subsystems are required such as a cryogenic system, RF system, vacuum system and radiation shielding. RF power required to generate accelerating field inside cavity depends on the RF coupling parameters of the power coupler and quality factor of the SRF cavity and the quality factor itself is affected by several factors such as operating temperature, external magnetic field level and surface condition. Therefore, these factors should be considered to estimate the required RF power for the SRF cavity test

  1. Turboelectric Aircraft Drive Key Performance Parameters and Functional Requirements

    Science.gov (United States)

    Jansen, Ralph H.; Brown, Gerald V.; Felder, James L.; Duffy, Kirsten P.

    2016-01-01

    The purpose of this paper is to propose specific power and efficiency as the key performance parameters for a turboelectric aircraft power system and investigate their impact on the overall aircraft. Key functional requirements are identified that impact the power system design. Breguet range equations for a base aircraft and a turboelectric aircraft are found. The benefits and costs that may result from the turboelectric system are enumerated. A break-even analysis is conducted to find the minimum allowable electric drive specific power and efficiency that can preserve the range, initial weight, operating empty weight, and payload weight of the base aircraft.

  2. Compiling Utility Requirements For New Nuclear Power Plant Project

    International Nuclear Information System (INIS)

    Patrakka, Eero

    2002-01-01

    Teollisuuden Voima Oy (TVO) submitted in November 2000 to the Finnish Government an application for a Decision-in-Principle concerning the construction of a new nuclear power plant in Finland. The actual investment decision can be made first after a positive decision has been made by the Government and the Parliament. Parallel to the licensing process, technical preparedness has been upheld so that the procurement process can be commenced without delay, when needed. This includes the definition of requirements for the plant and preliminary preparation of bid inquiry specifications. The core of the technical requirements corresponds to the specifications presented in the European Utility Requirement (EUR) document, compiled by major European electricity producers. Quite naturally, an amount of modifications to the EUR document are needed that take into account the country- and site-specific conditions as well as the experiences gained in the operation of the existing NPP units. Along with the EUR-related requirements concerning the nuclear island and power generation plant, requirements are specified for scope of supply as well as for a variety of issues related to project implementation. (author)

  3. Biofouling of power-plant service systems by Corbicula

    International Nuclear Information System (INIS)

    Page, T.L.; Neitzel, D.A.; Simmons, M.A.; Hayes, P.F.

    1983-08-01

    Corbicula sp. foul the service water systems at nuclear power plants because the environment within these systems is compatible with the ecological requirements of the species. To reduce Corbicula fouling, components of service water systems and operating procedures that enhance the potential for fouling need to be identified. Factors important in mediating biofouling of service water systems appear to be screening potential, minimum and maximum velocities and the operational procedures employed during power plant biofoulant control and downtime. These conclusions are based on the results of a categorical model we used to correlate information from power plants with that on Corbicula life history. Power plant parameters in the model include temperature, dissolved oxygen concentration, screen and strainer size, maximum and minimum velocities, and elements of the biofouling control procedures. Parameters for Corbicula include tolerances to temperature, dissolved oxygen, biofouling control chemicals, velocity preferences, and optimal temperatures for each life stage and behavior. 13 references, 5 figures

  4. Design and control of hybrid active power filters

    CERN Document Server

    Lam, Chi-Seng

    2014-01-01

    Design and Control of Hybrid Active Power Filters presents an overview of the current quality problems and their compensators. To get a balance between the system cost and performance, hybrid active power filters (HAPFs) are valuable. The book presents the coverage of resonance phenomena prevention capability, filtering performance and system robustness analysis of HAPF; nonlinear inverter current slope characteristics and their linear operation region requirement analysis of the hysteresis PWM for the HAPF; minimum inverter capacity design procedure of HAPF, adaptive dc-link voltage controller for the HAPF and the real design example of a 220V 10kVA HAPF, in which the system performance analysis method, minimum dc voltage deduction concept and adaptive dc voltage idea can be further extended into the other active compensators, such as APF, static synchronous compensator STATCOM, etc. This book will benefit researchers, graduate students, and electrical power engineers in the field of power-quality compensati...

  5. Power Consumption and Calculation Requirement Analysis of AES for WSN IoT.

    Science.gov (United States)

    Hung, Chung-Wen; Hsu, Wen-Ting

    2018-05-23

    Because of the ubiquity of Internet of Things (IoT) devices, the power consumption and security of IoT systems have become very important issues. Advanced Encryption Standard (AES) is a block cipher algorithm is commonly used in IoT devices. In this paper, the power consumption and cryptographic calculation requirement for different payload lengths and AES encryption types are analyzed. These types include software-based AES-CB, hardware-based AES-ECB (Electronic Codebook Mode), and hardware-based AES-CCM (Counter with CBC-MAC Mode). The calculation requirement and power consumption for these AES encryption types are measured on the Texas Instruments LAUNCHXL-CC1310 platform. The experimental results show that the hardware-based AES performs better than the software-based AES in terms of power consumption and calculation cycle requirements. In addition, in terms of AES mode selection, the AES-CCM-MIC64 mode may be a better choice if the IoT device is considering security, encryption calculation requirement, and low power consumption at the same time. However, if the IoT device is pursuing lower power and the payload length is generally less than 16 bytes, then AES-ECB could be considered.

  6. A transmission power optimization with a minimum node degree for energy-efficient wireless sensor networks with full-reachability.

    Science.gov (United States)

    Chen, Yi-Ting; Horng, Mong-Fong; Lo, Chih-Cheng; Chu, Shu-Chuan; Pan, Jeng-Shyang; Liao, Bin-Yih

    2013-03-20

    Transmission power optimization is the most significant factor in prolonging the lifetime and maintaining the connection quality of wireless sensor networks. Un-optimized transmission power of nodes either interferes with or fails to link neighboring nodes. The optimization of transmission power depends on the expected node degree and node distribution. In this study, an optimization approach to an energy-efficient and full reachability wireless sensor network is proposed. In the proposed approach, an adjustment model of the transmission range with a minimum node degree is proposed that focuses on topology control and optimization of the transmission range according to node degree and node density. The model adjusts the tradeoff between energy efficiency and full reachability to obtain an ideal transmission range. In addition, connectivity and reachability are used as performance indices to evaluate the connection quality of a network. The two indices are compared to demonstrate the practicability of framework through simulation results. Furthermore, the relationship between the indices under the conditions of various node degrees is analyzed to generalize the characteristics of node densities. The research results on the reliability and feasibility of the proposed approach will benefit the future real deployments.

  7. A Transmission Power Optimization with a Minimum Node Degree for Energy-Efficient Wireless Sensor Networks with Full-Reachability

    Science.gov (United States)

    Chen, Yi-Ting; Horng, Mong-Fong; Lo, Chih-Cheng; Chu, Shu-Chuan; Pan, Jeng-Shyang; Liao, Bin-Yih

    2013-01-01

    Transmission power optimization is the most significant factor in prolonging the lifetime and maintaining the connection quality of wireless sensor networks. Un-optimized transmission power of nodes either interferes with or fails to link neighboring nodes. The optimization of transmission power depends on the expected node degree and node distribution. In this study, an optimization approach to an energy-efficient and full reachability wireless sensor network is proposed. In the proposed approach, an adjustment model of the transmission range with a minimum node degree is proposed that focuses on topology control and optimization of the transmission range according to node degree and node density. The model adjusts the tradeoff between energy efficiency and full reachability to obtain an ideal transmission range. In addition, connectivity and reachability are used as performance indices to evaluate the connection quality of a network. The two indices are compared to demonstrate the practicability of framework through simulation results. Furthermore, the relationship between the indices under the conditions of various node degrees is analyzed to generalize the characteristics of node densities. The research results on the reliability and feasibility of the proposed approach will benefit the future real deployments. PMID:23519351

  8. Lift and Power Required for Flapping Wing Hovering Flight on Mars

    Science.gov (United States)

    Pohly, Jeremy; Sridhar, Madhu; Bluman, James; Kang, Chang-Kwon; Landrum, D. Brian; Fahimi, Farbod; Aono, Hikaru; Liu, Hao

    2017-11-01

    Achieving flight on Mars is challenging due to the ultra-low density atmosphere. Bio-inspired flapping motion can generate sufficient lift if bumblebee-inspired wings are scaled up between 2 and 4 times their nominal size. However, due to this scaling, the inertial power required to sustain hover increases and dominates over the aerodynamic power. Our results show that a torsional spring placed at the wing root can reduce the flapping power required for hover by efficiently storing and releasing energy while operating at its resonance frequency. The spring assisted reduction in flapping power is demonstrated with a well-validated, coupled Navier-Stokes and flight dynamics solver. The total power is reduced by 79%, whereas the flapping power is reduced by 98%. Such a reduction in power paves the way for an efficient, realizable micro air vehicle capable of vertical takeoff and landing as well as sustained flight on Mars. Alabama Space Grant Consortium Fellowship.

  9. Minimum requirements on implementation of the greenhouse gases ordinance. EU ordinance on fluorinated greenhouse gases; Mindestanforderungen zur Implementierung der F-Gase-Verordnung. Die EG-Verordnung zu fluorierten Treibhausgasen

    Energy Technology Data Exchange (ETDEWEB)

    Preisegger, E. [Solvay Fluor GmbH, Hannover (Germany). Environmental and Public Affairs Fluorochemicals

    2008-04-15

    On 4 July 2006, the EU ordinance 842/2006 on fluorinated greenhouse gases came into force. Since 4 July 2007, it has been in effect with the exception of article 9 and appendix II both of which had been effective since 4 July 2006. However, some articles of the ordinance necessitate the definition of minimum requirements resp. of form and contents by the EU commission. The minimum requirements for training and certification will provide a basis for national implementation of these measures in the EU member states. (orig.)

  10. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  11. Minimum number of transfer units and reboiler duty for multicomponent distillation columns

    International Nuclear Information System (INIS)

    Pleşu, Valentin; Bonet Ruiz, Alexandra Elena; Bonet, Jordi; Llorens, Joan; Iancu, Petrica

    2013-01-01

    Some guidelines to evaluate distillation columns, considering only basic thermodynamic data and principles, are provided in this paper. The method allows a first insight to the problem by simple calculations, without requiring column variables to ensure rational use of energy and low environmental impact. The separation system is approached by two complementary ways: minimum and infinite reflux flow rate. The minimum reflux provides the minimum energy requirements, and the infinite reflux provides the feasibility conditions. The difficulty of separation can be expressed in terms of number of transfer units (NTU). The applicability of the method is not mathematically limited by the number of components in the mixture. It is also applicable to reactive distillation. Several mixtures, including reactive distillation, are rigorously simulated as illustrative examples, to verify the applicability of the approach. The separation of the mixtures, performed by distillation columns, is feasible if a minimum NTU can be calculated between the distillate and bottom products. Once verified the feasibility of the separation, the maximum thermal efficiency depends only on boiling point of bottom and distillate streams. The minimum energy requirements corresponding to the reboiler can be calculated from the maximum thermal efficiency, and the variation of entropy and enthalpy of mixing between distillate and bottom streams. -- Highlights: • Feasibility analysis complemented with difficulty of separation parameters • Minimum and infinite reflux simplified models for distillation columns • Minimum number of transfer units (NTU) for packed columns at early design stages • Calculation of minimum energy distillation requirements at early design stages • Thermodynamic cycle approach and efficiency for distillation columns

  12. Minimum quality requirements for water reuse in agricultural irrigation and aquifer recharge - Towards a water reuse regulatory instrument at EU level Réédition

    OpenAIRE

    ALCALDE SANZ LAURA; GAWLIK BERND

    2017-01-01

    As an input to the design of a Legal Instrument on Water Reuse in Europe, this report recommends minimum quality requirements for water reuse in agricultural irrigation and aquifer recharge based on a risk management approach.

  13. Wind power integration into the automatic generation control of power systems with large-scale wind power

    Directory of Open Access Journals (Sweden)

    Abdul Basit

    2014-10-01

    Full Text Available Transmission system operators have an increased interest in the active participation of wind power plants (WPP in the power balance control of power systems with large wind power penetration. The emphasis in this study is on the integration of WPPs into the automatic generation control (AGC of the power system. The present paper proposes a coordinated control strategy for the AGC between combined heat and power plants (CHPs and WPPs to enhance the security and the reliability of a power system operation in the case of a large wind power penetration. The proposed strategy, described and exemplified for the future Danish power system, takes the hour-ahead regulating power plan for generation and power exchange with neighbouring power systems into account. The performance of the proposed strategy for coordinated secondary control is assessed and discussed by means of simulations for different possible future scenarios, when wind power production in the power system is high and conventional production from CHPs is at a minimum level. The investigation results of the proposed control strategy have shown that the WPPs can actively help the AGC, and reduce the real-time power imbalance in the power system, by down regulating their production when CHPs are unable to provide the required response.

  14. Cost-optimal levels of minimum energy performance requirements in the Danish Building Regulations

    Energy Technology Data Exchange (ETDEWEB)

    Aggerholm, S.

    2013-09-15

    The purpose of the report is to analyse the cost optimality of the energy requirements in the Danish Building Regulations 2010, BR10 to new building and to existing buildings undergoing major renovation. The energy requirements in the Danish Building Regulations have by tradition always been based on the cost and benefits related to the private economical or financial perspective. Macro economical calculations have in the past only been made in addition. The cost optimum used in this report is thus based on the financial perspective. Due to the high energy taxes in Denmark there is a significant difference between the consumer price and the macro economical for energy. Energy taxes are also paid by commercial consumers when the energy is used for building operation e.g. heating, lighting, ventilation etc. In relation to the new housing examples the present minimum energy requirements in BR 10 all shows gaps that are negative with a deviation of up till 16 % from the point of cost optimality. With the planned tightening of the requirements to new houses in 2015 and in 2020, the energy requirements can be expected to be tighter than the cost optimal point, if the costs for the needed improvements don't decrease correspondingly. In relation to the new office building there is a gap of 31 % to the point of cost optimality in relation to the 2010 requirement. In relation to the 2015 and 2020 requirements there are negative gaps to the point of cost optimality based on today's prices. If the gaps for all the new buildings are weighted to an average based on mix of building types and heat supply for new buildings in Denmark there is a gap of 3 % in average for the new building. The excessive tightness with today's prices is 34 % in relation to the 2015 requirement and 49 % in relation to the 2020 requirement. The component requirement to elements in the building envelope and to installations in existing buildings adds up to significant energy efficiency

  15. Near-Threshold Computing and Minimum Supply Voltage of Single-Rail MCML Circuits

    Directory of Open Access Journals (Sweden)

    Ruiping Cao

    2014-01-01

    Full Text Available In high-speed applications, MOS current mode logic (MCML is a good alternative. Scaling down supply voltage of the MCML circuits can achieve low power-delay product (PDP. However, the current almost all MCML circuits are realized with dual-rail scheme, where the NMOS configuration in series limits the minimum supply voltage. In this paper, single-rail MCML (SRMCML circuits are described, which can avoid the devices configuration in series, since their logic evaluation block can be realized by only using MOS devices in parallel. The relationship between the minimum supply voltage of the SRMCML circuits and the model parameters of MOS transistors is derived, so that the minimum supply voltage can be estimated before circuit designs. An MCML dynamic flop-flop based on SRMCML is also proposed. The optimization algorithm for near-threshold sequential circuits is presented. A near-threshold SRMCML mode-10 counter based on the optimization algorithm is verified. Scaling down the supply voltage of the SRMCML circuits is also investigated. The power dissipation, delay, and power-delay products of these circuits are carried out. The results show that the near-threshold SRMCML circuits can obtain low delay and small power-delay product.

  16. Quantitative Research on the Minimum Wage

    Science.gov (United States)

    Goldfarb, Robert S.

    1975-01-01

    The article reviews recent research examining the impact of minimum wage requirements on the size and distribution of teenage employment and earnings. The studies measure income distribution, employment levels and effect on unemployment. (MW)

  17. Supplying the power requirements to a sensor network using radio frequency power transfer.

    Science.gov (United States)

    Percy, Steven; Knight, Chris; Cooray, Francis; Smart, Ken

    2012-01-01

    Wireless power transmission is a method of supplying power to small electronic devices when there is no wired connection. One way to increase the range of these systems is to use a directional transmitting antenna, the problem with this approach is that power can only be transmitted through a narrow beam and directly forward, requiring the transmitter to always be aligned with the sensor node position. The work outlined in this article describes the design and testing of an autonomous radio frequency power transfer system that is capable of rotating the base transmitter to track the position of sensor nodes and transferring power to that sensor node. The system's base station monitors the node's energy levels and forms a charge queue to plan charging order and maintain energy levels of the nodes. Results show a radio frequency harvesting circuit with a measured S11 value of -31.5 dB and a conversion efficiency of 39.1%. Simulation and experimentation verified the level of power transfer and efficiency. The results of this work show a small network of three nodes with different storage types powered by a central base node.

  18. Supplying the Power Requirements to a Sensor Network Using Radio Frequency Power Transfer

    Directory of Open Access Journals (Sweden)

    Steven Percy

    2012-06-01

    Full Text Available Wireless power transmission is a method of supplying power to small electronic devices when there is no wired connection. One way to increase the range of these systems is to use a directional transmitting antenna, the problem with this approach is that power can only be transmitted through a narrow beam and directly forward, requiring the transmitter to always be aligned with the sensor node position. The work outlined in this article describes the design and testing of an autonomous radio frequency power transfer system that is capable of rotating the base transmitter to track the position of sensor nodes and transferring power to that sensor node. The system’s base station monitors the node’s energy levels and forms a charge queue to plan charging order and maintain energy levels of the nodes. Results show a radio frequency harvesting circuit with a measured S11 value of −31.5 dB and a conversion efficiency of 39.1%. Simulation and experimentation verified the level of power transfer and efficiency. The results of this work show a small network of three nodes with different storage types powered by a central base node.

  19. Forecast of wind energy production and ensuring required balancing power

    International Nuclear Information System (INIS)

    Merkulov, M.

    2010-01-01

    The wind energy is gaining larger part of the energy mix around the world as well as in Bulgaria. Having in mind the irregularity of the wind, we are in front of a challenge for management of the power grid in new unknown conditions. The world's experience has proven that there could be no effective management of the grid without forecasting tools, even with small scale of wind power penetration. Application of such tools promotes simple management of large wind energy production and reduction of the quantities of required balancing powers. The share of the expenses and efforts for forecasting of the wind energy is incomparably small in comparison with expenses for keeping additional powers in readiness. The recent computers potential allow simple and rapid processing of large quantities of data from different sources, which provides required conditions for modeling the world's climate and producing sophisticated forecast. (author)

  20. Decentral power stores. Key components of future power supply concepts; Dezentrale Energiespeicher. Schluesselkomponenten fuer die Stromversorgung der Zukunft

    Energy Technology Data Exchange (ETDEWEB)

    Huschke, Reinhard

    2011-07-01

    The book presents the most relevant power storage technologies, i.e. their advantages, shortcomings and possible applications. The focus is on decentral power stores that can be used wherever electric power must be stored, independent of local conditions. Although this concept does not play much of a role today, it will become more relevant in the context of increasingly decentral power supply. For 2020, a minimum share of 30 percent renewable energy in German power supply is required by law, while other scenarios assume an even bigger share. The present storage reserve capacity will not be sufficient for this. The book also goes into the applications of power storage systems in the fields of electromobility and in future, more decentral power grids. (orig.)

  1. A novel minimum cost maximum power algorithm for future smart home energy management

    Directory of Open Access Journals (Sweden)

    A. Singaravelan

    2017-11-01

    Full Text Available With the latest development of smart grid technology, the energy management system can be efficiently implemented at consumer premises. In this paper, an energy management system with wireless communication and smart meter are designed for scheduling the electric home appliances efficiently with an aim of reducing the cost and peak demand. For an efficient scheduling scheme, the appliances are classified into two types: uninterruptible and interruptible appliances. The problem formulation was constructed based on the practical constraints that make the proposed algorithm cope up with the real-time situation. The formulated problem was identified as Mixed Integer Linear Programming (MILP problem, so this problem was solved by a step-wise approach. This paper proposes a novel Minimum Cost Maximum Power (MCMP algorithm to solve the formulated problem. The proposed algorithm was simulated with input data available in the existing method. For validating the proposed MCMP algorithm, results were compared with the existing method. The compared results prove that the proposed algorithm efficiently reduces the consumer electricity consumption cost and peak demand to optimum level with 100% task completion without sacrificing the consumer comfort.

  2. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  3. Bruce Power's nuclear pressure boundary quality assurance program requirements, implementation and transition

    International Nuclear Information System (INIS)

    Krane, J.C.

    2009-01-01

    The development of a full scope nuclear pressure boundary quality assurance program in Canada requires extensive knowledge of the structure and detailed requirements of codes and standards published by the Canadian Standards Association (CSA) and American Society of Mechanical Engineers (ASME). Incorporation into company governance documents and implementation of these requirements while managing the transition to more recent revisions of these codes and standards represents a significant challenge for Bruce Power, Canada's largest independent nuclear operator. This paper explores the key developments and innovative changes that are used to ensure successful regulatory compliance and effective implementation of the Bruce Power Pressure Boundary Quality Assurance Program. Challenges and mitigating strategies to sustain this large compliance based program at Bruce Power's 8 unit nuclear power plant site will also be detailed. (author)

  4. Requirements under decree 430 UJD for unit outlet and standby power supply

    International Nuclear Information System (INIS)

    Vanco, K.

    2012-01-01

    At present, the nuclear power plants are only sufficient resources, which can cover a huge demand for electricity. Concentration so huge power in one place require adequate security from the perspective lead power outlet and standby power supply of reactor unit. (Author)

  5. Regulatory requirement of the Juragua nuclear Power Plant PSA

    International Nuclear Information System (INIS)

    Valhuerdi Debesa, C.

    1996-01-01

    Probabilistic Safety Assessment has proved to be a powerful tool for improving the knowledge of the safety insides of Nuclear Power Plants and increasing the efficiency of the safety measures adopted by both operators and regulators. In this paper the regulatory approach adopted in Cuba with regard to the PSA , the scope of the requirement and the basis and proposal of this decision are presented

  6. Modeling ecological minimum requirements for distribution of greater sage-grouse leks: implications for population connectivity across their western range, U.S.A.

    Science.gov (United States)

    Knick, Steven T; Hanser, Steven E; Preston, Kristine L

    2013-06-01

    Greater sage-grouse Centrocercus urophasianus (Bonaparte) currently occupy approximately half of their historical distribution across western North America. Sage-grouse are a candidate for endangered species listing due to habitat and population fragmentation coupled with inadequate regulation to control development in critical areas. Conservation planning would benefit from accurate maps delineating required habitats and movement corridors. However, developing a species distribution model that incorporates the diversity of habitats used by sage-grouse across their widespread distribution has statistical and logistical challenges. We first identified the ecological minimums limiting sage-grouse, mapped similarity to the multivariate set of minimums, and delineated connectivity across a 920,000 km(2) region. We partitioned a Mahalanobis D (2) model of habitat use into k separate additive components each representing independent combinations of species-habitat relationships to identify the ecological minimums required by sage-grouse. We constructed the model from abiotic, land cover, and anthropogenic variables measured at leks (breeding) and surrounding areas within 5 km. We evaluated model partitions using a random subset of leks and historic locations and selected D (2) (k = 10) for mapping a habitat similarity index (HSI). Finally, we delineated connectivity by converting the mapped HSI to a resistance surface. Sage-grouse required sagebrush-dominated landscapes containing minimal levels of human land use. Sage-grouse used relatively arid regions characterized by shallow slopes, even terrain, and low amounts of forest, grassland, and agriculture in the surrounding landscape. Most populations were interconnected although several outlying populations were isolated because of distance or lack of habitat corridors for exchange. Land management agencies currently are revising land-use plans and designating critical habitat to conserve sage-grouse and avoid endangered

  7. Modeling ecological minimum requirements for distribution of greater sage-grouse leks: implications for population connectivity across their western range, U.S.A.

    Science.gov (United States)

    Knick, Steven T.; Hanser, Steven E.; Preston, Kristine L.

    2013-01-01

    Greater sage-grouse Centrocercus urophasianus (Bonaparte) currently occupy approximately half of their historical distribution across western North America. Sage-grouse are a candidate for endangered species listing due to habitat and population fragmentation coupled with inadequate regulation to control development in critical areas. Conservation planning would benefit from accurate maps delineating required habitats and movement corridors. However, developing a species distribution model that incorporates the diversity of habitats used by sage-grouse across their widespread distribution has statistical and logistical challenges. We first identified the ecological minimums limiting sage-grouse, mapped similarity to the multivariate set of minimums, and delineated connectivity across a 920,000 km2 region. We partitioned a Mahalanobis D2 model of habitat use into k separate additive components each representing independent combinations of species–habitat relationships to identify the ecological minimums required by sage-grouse. We constructed the model from abiotic, land cover, and anthropogenic variables measured at leks (breeding) and surrounding areas within 5 km. We evaluated model partitions using a random subset of leks and historic locations and selected D2 (k = 10) for mapping a habitat similarity index (HSI). Finally, we delineated connectivity by converting the mapped HSI to a resistance surface. Sage-grouse required sagebrush-dominated landscapes containing minimal levels of human land use. Sage-grouse used relatively arid regions characterized by shallow slopes, even terrain, and low amounts of forest, grassland, and agriculture in the surrounding landscape. Most populations were interconnected although several outlying populations were isolated because of distance or lack of habitat corridors for exchange. Land management agencies currently are revising land-use plans and designating critical habitat to conserve sage-grouse and avoid endangered

  8. Identification of Evidence for Key Parameters in Decision-Analytic Models of Cost Effectiveness: A Description of Sources and a Recommended Minimum Search Requirement.

    Science.gov (United States)

    Paisley, Suzy

    2016-06-01

    This paper proposes recommendations for a minimum level of searching for data for key parameters in decision-analytic models of cost effectiveness and describes sources of evidence relevant to each parameter type. Key parameters are defined as treatment effects, adverse effects, costs, resource use, health state utility values (HSUVs) and baseline risk of events. The recommended minimum requirement for treatment effects is comprehensive searching according to available methodological guidance. For other parameter types, the minimum is the searching of one bibliographic database plus, where appropriate, specialist sources and non-research-based and non-standard format sources. The recommendations draw on the search methods literature and on existing analyses of how evidence is used to support decision-analytic models. They take account of the range of research and non-research-based sources of evidence used in cost-effectiveness models and of the need for efficient searching. Consideration is given to what constitutes best evidence for the different parameter types in terms of design and scientific quality and to making transparent the judgments that underpin the selection of evidence from the options available. Methodological issues are discussed, including the differences between decision-analytic models of cost effectiveness and systematic reviews when searching and selecting evidence and comprehensive versus sufficient searching. Areas are highlighted where further methodological research is required.

  9. 77 FR 43196 - Minimum Internal Control Standards and Technical Standards

    Science.gov (United States)

    2012-07-24

    ... NATIONAL INDIAN GAMING COMMISSION 25 CFR Parts 543 and 547 Minimum Internal Control Standards [email protected] . SUPPLEMENTARY INFORMATION: Part 543 addresses minimum internal control standards (MICS) for Class II gaming operations. The regulations require tribes to establish controls and implement...

  10. Ant Colony Optimization and the Minimum Cut Problem

    DEFF Research Database (Denmark)

    Kötzing, Timo; Lehre, Per Kristian; Neumann, Frank

    2010-01-01

    Ant Colony Optimization (ACO) is a powerful metaheuristic for solving combinatorial optimization problems. With this paper we contribute to the theoretical understanding of this kind of algorithm by investigating the classical minimum cut problem. An ACO algorithm similar to the one that was prov...

  11. 29 CFR 552.100 - Application of minimum wage and overtime provisions.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Application of minimum wage and overtime provisions. 552... § 552.100 Application of minimum wage and overtime provisions. (a)(1) Domestic service employees must receive for employment in any household a minimum wage of not less than that required by section 6(a) of...

  12. Parameterization of ion channeling half-angles and minimum yields

    Energy Technology Data Exchange (ETDEWEB)

    Doyle, Barney L.

    2016-03-15

    A MS Excel program has been written that calculates ion channeling half-angles and minimum yields in cubic bcc, fcc and diamond lattice crystals. All of the tables and graphs in the three Ion Beam Analysis Handbooks that previously had to be manually looked up and read from were programed into Excel in handy lookup tables, or parameterized, for the case of the graphs, using rather simple exponential functions with different power functions of the arguments. The program then offers an extremely convenient way to calculate axial and planar half-angles, minimum yields, effects on half-angles and minimum yields of amorphous overlayers. The program can calculate these half-angles and minimum yields for 〈u v w〉 axes and [h k l] planes up to (5 5 5). The program is open source and available at (http://www.sandia.gov/pcnsc/departments/iba/ibatable.html).

  13. Minimum Plate Thickness in High-Speed Craft

    DEFF Research Database (Denmark)

    Pedersen, Preben Terndrup; Zhang, Shengming

    1998-01-01

    The minimum plate thickness requirements specified by the classification societies for high-speed craft are supposed to ensure adequate resistance to impact loads such as collision with floating objects and objects falling on the deck. The paper presents analytical methods of describing such impact...... phenomena and proposes performance requirements instead of thickness requirements for hull panels in high-speed craft made of different building materials....

  14. Solid-state fast voltage compensator for pulsed power applications requiring constant AC power consumption

    CERN Document Server

    Magallanes, Francisco Cabaleiro; Viarouge, Philippe; Cros, Jérôme

    2015-01-01

    This paper proposes a novel topological solution for pulsed power converters based on capacitor-discharge topologies, integrating a Fast Voltage Compensator which allows an operation at constant power consumption from the utility grid. This solution has been retained as a possible candidate for the CLIC project under study at CERN, which requires more than a thousand synchronously-operated klystron modulators producing a total pulsed power of almost 40 GW. The proposed Fast Voltage Compensator is integrated in the modulator such that it only has to treat the capacitor charger current and a fraction of the charging voltage, meaning that its dimensioning power and cost are minimized. This topology can be used to improve the AC power quality of any pulsed converters based on capacitor-discharge concept. A prototype has been built and exploited to validate the operating principle and demonstrate the benefits of the proposed solution.

  15. Empirical Models for Power and Energy Requirements II : A Powered Implement Operation in Serdang Sandy Clay Loam, Malaysia

    Directory of Open Access Journals (Sweden)

    A. F. Kheiralla

    2017-12-01

    Full Text Available Power and energy requirements were measured with an instrumented tractor for rotary tilling in Serdang sandy clay loam soil.  The effects of travel speed and rotor speed upon the measured data were investigated.  Power model from orthogonal regression analysis was formulated based on linear and quadratic functions of travel speed and bite length.  Fuel consumption model from regression analysis was formulated based on linear tractor PTO power as well as linear equivalent tractor PTO power.  Fuel consumption rates predicted by ASAE D497.3 were found to be 25% to 28% overestimates of the values predicted by the model developed.  However, fuel consumption rates reported by OECD Tractor Test were found to be 1% to 9% lower than the fuel consumption rates predicted by the model developed.  A comparison of power and energy requirements for both powered and draught implements showed that the disk harrow was the most energy efficient implement in terms of fuel consumption and specific energy followed by the rotary tiller, disk plough and mouldboard.  Finally, average PTO power, fuel consumption, wheel slip, wheel power and specific energy for a powered implement are presented.

  16. Validation of Power Requirement Model for Active Loudspeakers

    DEFF Research Database (Denmark)

    Schneider, Henrik; Madsen, Anders Normann; Bjerregaard, Ruben

    2015-01-01

    . There are however many advantages that could be harvested from such knowledge like size, cost and efficiency improvements. In this paper a recently proposed power requirement model for active loudspeakers is experimentally validated and the model is expanded to include the closed and vented type enclosures...

  17. Requirement profile for nuclear power station personnel

    International Nuclear Information System (INIS)

    Roeglin, H.C.

    1984-01-01

    The starting point in deriving the requirement profile for the shift personnel in the control rooms of nuclear power stations is information of a technical, organisational and ergonomic kind. The technique used, the distribution of work to different work areas and the configuration of the workplace is determined by the tasks and the environmental conditions in which they have to be done. (orig./DG) [de

  18. Fermat and the Minimum Principle

    Indian Academy of Sciences (India)

    Arguably, least action and minimum principles were offered or applied much earlier. This (or these) principle(s) is/are among the fundamental, basic, unifying or organizing ones used to describe a variety of natural phenomena. It considers the amount of energy expended in performing a given action to be the least required ...

  19. Overall quality assurance program requirements for nuclear power plants

    International Nuclear Information System (INIS)

    1992-09-01

    This standard contains the requirements for the owner's overall quality assurance program for a nuclear power plant. This program encompasses all phases of a nuclear power plant life cycle, including site evaluation, design, procurement, manufacturing, construction and installation, commissioning, operation, and decommissioning. It covers the activities associated with specifying, directing, and administering the work to be done during these phases, and the evaluation and integrated of the activities and programs of participants

  20. 7 CFR 35.11 - Minimum requirements.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing... applicable to the variety and destination specified: (a) Any such variety for export to destinations in Japan... requirements. (b) Any such variety for export to any foreign destination, other than destinations in Japan...

  1. Allocation of optimal distributed generation using GA for minimum ...

    African Journals Online (AJOL)

    user

    quality of supply and reliability in tern extending equipment maintenance intervals and ... The performance of the method is tested on 33-bus test system and ... minimum real power losses of the system by calculating DG size at different buses.

  2. Proposed minimum requirements for the operational characteristics and testing of closed circuit life support system control electronics.

    Science.gov (United States)

    Kirk, J C

    1998-01-01

    The popularization and transformation of scuba diving into a broadly practiced sport has served to ignite the interest of technically oriented divers into ever more demanding areas. This, along with the gradual release of military data, equipment, and techniques of closed circuit underwater breathing apparatus, has resulted in a virtual explosion of semiclosed and closed circuit systems for divers. Although many of these systems have been carefully thought out by capable designers, the impulse to rush to market with equipment that has not been fully developed and carefully tested is irresistible to marketers. In addition, the presence of systems developed by well-intentioned and otherwise competent designers who are, nonetheless, inexperienced in the field of life support can result in the sale of failure-prone equipment to divers who lack the knowledge and skills to identify deficiencies before disaster occurs. For this reason, a set of industry standards establishing minimum requirements and testing is needed to guide the designers of this equipment, and to protect the user community from incomplete or inadequate design. Many different technologies go into the development of closed circuit scuba. One key area is the design of electronics to monitor and maintain the critical gas mixtures of the closed circuit loop. Much of the system reliability and inherent danger is resident in the design of the circuitry and the software (if any) that runs it. This article will present a set of proposed minimum requirements, with the goal of establishing a dialog for the creation of guidelines for the classification, rating, design, and testing of embedded electronics for life support systems used in closed circuit applications. These guidelines will serve as the foundation for the later creation of a set of industry specifications.

  3. 18 CFR Appendix A to Part 380 - Minimum Filing Requirements for Environmental Reports Under the Natural Gas Act

    Science.gov (United States)

    2010-04-01

    ... Requirements for Environmental Reports Under the Natural Gas Act A Appendix A to Part 380 Conservation of Power... Filing Requirements for Environmental Reports Under the Natural Gas Act Environmental Reports Under the Natural Gas Act. Resource Report 1—General Project Description 1. Provide a detailed description and...

  4. State cigarette minimum price laws - United States, 2009.

    Science.gov (United States)

    2010-04-09

    Cigarette price increases reduce the demand for cigarettes and thereby reduce smoking prevalence, cigarette consumption, and youth initiation of smoking. Excise tax increases are the most effective government intervention to increase the price of cigarettes, but cigarette manufacturers use trade discounts, coupons, and other promotions to counteract the effects of these tax increases and appeal to price-sensitive smokers. State cigarette minimum price laws, initiated by states in the 1940s and 1950s to protect tobacco retailers from predatory business practices, typically require a minimum percentage markup to be added to the wholesale and/or retail price. If a statute prohibits trade discounts from the minimum price calculation, these laws have the potential to counteract discounting by cigarette manufacturers. To assess the status of cigarette minimum price laws in the United States, CDC surveyed state statutes and identified those states with minimum price laws in effect as of December 31, 2009. This report summarizes the results of that survey, which determined that 25 states had minimum price laws for cigarettes (median wholesale markup: 4.00%; median retail markup: 8.00%), and seven of those states also expressly prohibited the use of trade discounts in the minimum retail price calculation. Minimum price laws can help prevent trade discounting from eroding the positive effects of state excise tax increases and higher cigarette prices on public health.

  5. Recommended general safety requirements for nuclear power plants

    International Nuclear Information System (INIS)

    1983-06-01

    This report presents recommendations for a set of general safety requirements that could form the basis for the licensing of nuclear power plants by the Atomic Energy Control Board. In addition to a number of recommended deterministic requirements the report includes criteria for the acceptability of the design of such plants based upon the calculated probability and consequence (in terms of predicted radiation dose to members of the public) of potential fault sequences. The report also contains a historical review of nuclear safety principles and practices in Canada

  6. Determining minimum lubrication film for machine parts

    Science.gov (United States)

    Hamrock, B. J.; Dowson, D.

    1978-01-01

    Formula predicts minimum film thickness required for fully-flooded ball bearings, gears, and cams. Formula is result of study to determine complete theoretical solution of isothermal elasto-hydrodynamic lubrication of fully-flooded elliptical contacts.

  7. Management of radioactive wastes from nuclear power plants

    International Nuclear Information System (INIS)

    1985-01-01

    This Code of Practice defines the minimum requirements for the design and operation of structures, systems and components important for the management of radioactive wastes from thermal neutron nuclear power plants. The topics covered include design and operation of gaseous, liquid and solid waste systems, waste transport, storage and disposal, decommissioning wastes and wastes from unplanned events

  8. Dual shear plate power processor packaging design. [for Solar Electric Propulsion spacecraft

    Science.gov (United States)

    Franzon, A. O.; Fredrickson, C. D.; Ross, R. G.

    1975-01-01

    The use of solar electric propulsion (SEP) for spacecraft primary propulsion imposes an extreme range of operational and environmental design requirements associated with the diversity of missions for which solar electric primary propulsion is advantageous. One SEP element which is particularly sensitive to these environmental extremes is the power processor unit (PPU) which powers and controls the electric ion thruster. An improved power processor thermal-mechanical packaging approach, referred to as dual shear plate packaging, has been designed to accommodate these different requirements with minimum change to the power processor design. Details of this packaging design are presented together with test results obtained from thermal-vacuum and structural-vibration tests conducted with prototype hardware.

  9. [Hospitals failing minimum volumes in 2004: reasons and consequences].

    Science.gov (United States)

    Geraedts, M; Kühnen, C; Cruppé, W de; Blum, K; Ohmann, C

    2008-02-01

    In 2004 Germany introduced annual minimum volumes nationwide on five surgical procedures: kidney, liver, stem cell transplantation, complex oesophageal, and pancreatic interventions. Hospitals that fail to reach the minimum volumes are no longer allowed to perform the respective procedures unless they raise one of eight legally accepted exceptions. The goal of our study was to investigate how many hospitals fell short of the minimum volumes in 2004, whether and how this was justified, and whether hospitals that failed the requirements experienced any consequences. We analysed data on meeting the minimum volume requirements in 2004 that all German hospitals were obliged to publish as part of their biannual structured quality reports. We performed telephone interviews: a) with all hospitals not achieving the minimum volumes for complex oesophageal, and pancreatic interventions, and b) with the national umbrella organisations of all German sickness funds. In 2004, one quarter of all German acute care hospitals (N=485) performed 23,128 procedures where minimum volumes applied. 197 hospitals (41%) did not meet at least one of the minimum volumes. These hospitals performed N=715 procedures (3.1%) where the minimum volumes were not met. In 43% of these cases the hospitals raised legally accepted exceptions. In 33% of the cases the hospitals argued using reasons that were not legally acknowledged. 69% of those hospitals that failed to achieve the minimum volumes for complex oesophageal and pancreatic interventions did not experience any consequences from the sickness funds. However, one third of those hospitals reported that the sickness funds addressed the issue and partially announced consequences for the future. The sickness funds' umbrella organisations stated that there were only sparse activities related to the minimum volumes and that neither uniform registrations nor uniform proceedings in case of infringements of the standards had been agreed upon. In spite of the

  10. Minimum Benefits for HIV/AIDS in South African Medical Schemes ...

    African Journals Online (AJOL)

    ... to the Minister of Health in respect of the extent of prescribed minimum benefits for HIV/AIDS. Medical schemes are required to provide the PMBs to their members without limits or co-payments. Keywords: Medical schemes; HIV; AIDS; benefits; prescribed minimum benefits. South African Actuarial Journal: 2003 3: 77-112 ...

  11. Power generation scheduling. A free market based procedure with reserve constraints included

    International Nuclear Information System (INIS)

    Huse, Einar Staale

    1998-01-01

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs

  12. Power generation scheduling. A free market based procedure with reserve constraints included

    Energy Technology Data Exchange (ETDEWEB)

    Huse, Einar Staale

    1999-12-31

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs.

  13. Power generation scheduling. A free market based procedure with reserve constraints included

    Energy Technology Data Exchange (ETDEWEB)

    Huse, Einar Staale

    1998-12-31

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs.

  14. International requirements for life extension of nuclear power plants

    International Nuclear Information System (INIS)

    Wernicke, Robert

    2009-01-01

    Lifetime extension or long-term operation of nuclear facilities are topics of great international significance against the backdrop of a fleet of nuclear power plants of which many have reached 2/3 of their planned life. The article deals with the conditions for, and the specific requirements of, seeking long-term operation of nuclear power plants as established internationally and on the basis of IAEA collections. Technically, long-term operation is possible for many of the nuclear power plants in the world because, normally, they were built on the basis of conservative rules and regulations and, as a consequence, incorporate significant additional safety. Application of requirements to specific plants implies assessments of technical safety which show that conservative design philosophies created reserves and, as a consequence, there is an adequate level of safety also in long-term plant operation. For this purpose, the technical specifications must be revised, necessary additions made, and (international) operating experience taken into account and management of aging established. Two examples are presented to show how the approach to long-term plant operation is put into practice on a national level. (orig.)

  15. Evaluation of the energy required for constructing and operating a fusion power plant

    International Nuclear Information System (INIS)

    Buende, R.

    1982-09-01

    The energy required for constructing and operating a tokamak fusion power plant is appraised with respect to the energy output during the lifetime of the plant. A harvesting factor is deduced as a relevant figure of energetic merit and is used for a comparison between fusion, fission, and coal-fired power plants. Because fusion power plants involve considerable uncertainties the comparison is supplemented by a sensitivity analysis. In comparison with Light Water Reactor plants fusion power plants appear to be rather favourable in this respect. The energy required for providing the fuel is relatively low for fusion plants, thus overcompensating the considerable higher amount of energy necessary for constructing the fusion power plant. (orig.)

  16. The Effect of the Minimum Compensating Cash Balance on School District Investments.

    Science.gov (United States)

    Dembowski, Frederick L.

    Banks are usually reimbursed for their checking account services either by a fixed service charge or by requiring a minimum or minimum-average compensating cash balance. This paper demonstrates how to determine the optimal minimum balance for a school district to maintain in its account. It is assumed that both the bank and the school district use…

  17. Generating units performances: power system requirements

    Energy Technology Data Exchange (ETDEWEB)

    Fourment, C; Girard, N; Lefebvre, H

    1994-08-01

    The part of generating units within the power system is more than providing power and energy. Their performance are not only measured by their energy efficiency and availability. Namely, there is a strong interaction between the generating units and the power system. The units are essential components of the system: for a given load profile the frequency variation follows directly from the behaviour of the units and their ability to adapt their power output. In the same way, the voltage at the units terminals are the key points to which the voltage profile at each node of the network is linked through the active and especially the reactive power flows. Therefore, the customer will experience the frequency and voltage variations induced by the units behaviour. Moreover, in case of adverse conditions, if the units do not operate as well as expected or trip, a portion of the system, may be the whole system, may collapse. The limitation of the performance of a unit has two kinds of consequences. Firstly, it may result in an increased amount of not supplied energy or loss of load probability: for example if the primary reserve is not sufficient, a generator tripping may lead to an abnormal frequency deviation, and load may have to be shed to restore the balance. Secondly, the limitation of a unit performance results in an economic over-cost for the system: for instance, if not enough `cheap` units are able to load-following, other units with higher operating costs have to be started up. We would like to stress the interest for the operators and design teams of the units on the one hand, and the operators and design teams of the system on the other hand, of dialog and information exchange, in operation but also at the conception stage, in order to find a satisfactory compromise between the system requirements and the consequences for the generating units. (authors). 11 refs., 4 figs.

  18. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements (French Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This publication describes the requirements to be met to ensure the safe operation of nuclear power plants. It takes into account developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication.

  19. Wind Turbine Down-regulation Strategy for Minimum Wake Deficit

    DEFF Research Database (Denmark)

    Ma, Kuichao; Zhu, Jiangsheng; N. Soltani, Mohsen

    2017-01-01

    Down-regulation mode of wind turbine is commonly used no matter for the reserve power for supporting ancillary service to the grid, power optimization in wind farm or reducing power loss in the fault condition. It is also a method to protect faulty turbine. A down-regulation strategy based...... on minimum wake deficit is proposed in this paper, for the power improvement of the downwind turbine in low and medium wind speed region. The main idea is to operate turbine work at an appropriate operating point through rotor speed and torque control. The effectiveness of the strategy is verified...... by comparing with maximum rotor speed strategy. The result shows that the proposed strategy can improve the power of downwind turbine effectively....

  20. Parameterized Flight Mission for Secondary Power Requirement Estimations of Commercial Transport Aircraft

    OpenAIRE

    Lampl, Thomas; Muschkorgel, Sandra; Hornung, Mirko;

    2018-01-01

    The trend towards More-Electric Aircraft (MEA) and the introduction of new system technologies lead to considerable changes at the system level of commercial transport aircraft. Because the number of systems and power requirements are increasing, the consideration and integration of aircraft systems in early aircraft design phases is important. The objective of this contribution is to develop a characteristic flight mission with modelled aircraft systems to estimate the secondary power requir...

  1. Reduction of wind power induced reserve requirements by advanced shortest-term forecasts and prediction intervals

    Energy Technology Data Exchange (ETDEWEB)

    Dobschinski, Jan; Wessel, Arne; Lange, Bernhard; Bremen, Lueder von [Fraunhofer Institut fuer Windenergie und Energiesystemtechnik (IWES), Kassel (Germany)

    2009-07-01

    In electricity systems with large penetration of wind power, the limited predictability of the wind power generation leads to an increase in reserve and balancing requirements. At first the present study concentrates on the capability of dynamic day-ahead prediction intervals to reduce the wind power induced reserve and balancing requirements. Alternatively the reduction of large forecast errors of the German wind power generation by using advanced shortest-term predictions has been evaluated in a second approach. With focus on the allocation of minute reserve power the aim is to estimate the maximal remaining uncertainty after trading activities on the intraday market. Finally both approaches were used in a case study concerning the reserve requirements induced by the total German wind power expansion in 2007. (orig.)

  2. Bifacial PV cell with reflector for stand-alone mast for sensor powering purposes

    Science.gov (United States)

    Jakobsen, Michael L.; Thorsteinsson, Sune; Poulsen, Peter B.; Riedel, N.; Rødder, Peter M.; Rødder, Kristin

    2017-09-01

    Reflectors to bifacial PV-cells are simulated and prototyped in this work. The aim is to optimize the reflector to specific latitudes, and particularly northern latitudes. Specifically, by using minimum semiconductor area the reflector must be able to deliver the electrical power required at the condition of minimum solar travel above the horizon, worst weather condition etc. We will test a bifacial PV-module with a retroreflector, and compare the output with simulations combined with local solar data.

  3. Human Resources Requirements for New Nuclear Power Programs

    International Nuclear Information System (INIS)

    Goodnight, Charles T.

    2014-01-01

    Summary: Planning to Meet HR Requirements for New Nuclear Power Programs Must Begin Early. Many years of preparation are required before the “Right Number of the Right People” … will be … “In the Right Place at the Right Time”. • Seven key steps which must be taken include: 1) Identify detailed Human Resources requirements, based on the selected site and reactor design; 2) Conduct an assessment of national capacity to develop and/or provide those resources; 3) Conduct a Gap Analysis to determine what additional steps will be needed to fill any capacity shortfalls; 4) Develop initial and recurring recruiting and training plans; 5) Begin recruiting and training; 6) Review and adjust as personnel move and/or leave; 7) Ensure adequate relationships are in place for sources of future recruiting

  4. The requirements and specific features related to power supply in telecommunications of Ukraine

    Energy Technology Data Exchange (ETDEWEB)

    Lubashenko, T. [Inst. Giprosvijaz, Kiev (Ukraine); Gordon, A. [ProElectro Ltd., Kiev (Ukraine)

    2000-07-01

    The article deals with the description of trends of power supplies in the telecommunication sector. The basic normative documents regarding the design of the power supplies are pointed out. The requirements concerning the design of the power supplies are outlined. The peculiarities of the power supplies in Ukrainian telecommunications are given. (orig.)

  5. Key Performance Parameter Driven Technology Goals for Electric Machines and Power Systems

    Science.gov (United States)

    Bowman, Cheryl; Jansen, Ralph; Brown, Gerald; Duffy, Kirsten; Trudell, Jeffrey

    2015-01-01

    Transitioning aviation to low carbon propulsion is one of the crucial strategic research thrust and is a driver in the search for alternative propulsion system for advanced aircraft configurations. This work requires multidisciplinary skills coming from multiple entities. The feasibility of scaling up various electric drive system technologies to meet the requirements of a large commercial transport is discussed in terms of key parameters. Functional requirements are identified that impact the power system design. A breakeven analysis is presented to find the minimum allowable electric drive specific power and efficiency that can preserve the range, initial weight, operating empty weight, and payload weight of the base aircraft.

  6. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements (Arabic Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  7. IEEE Std 382-1985: IEEE standard for qualification of actuators for power operated valve assemblies with safety-related functions for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard describes the qualification of all types of power-driven valve actuators, including damper actuators, for safety-related functions in nuclear power generating stations. This standard may also be used to separately qualify actuator components. This standard establishes the minimum requirements for, and guidance regarding, the methods and procedures for qualification of power-driven valve actuators with safety-related functions Part I describes the qualification process. Part II describes the standard qualification cases and their environmental parameters for the usual locations of safety-related equipment in a nuclear generating station. Part III describes the qualification tests outlined in 6.3.3

  8. Assessment of tritium breeding requirements for fusion power reactors

    International Nuclear Information System (INIS)

    Jung, J.

    1983-12-01

    This report presents an assessment of tritium-breeding requirements for fusion power reactors. The analysis is based on an evaluation of time-dependent tritium inventories in the reactor system. The method presented can be applied to any fusion systems in operation on a steady-state mode as well as on a pulsed mode. As an example, the UWMAK-I design was analyzed and it has been found that the startup inventory requirement calculated by the present method significantly differs from those previously calculated. The effect of reactor-parameter changes on the required tritium breeding ratio is also analyzed for a variety of reactor operation scenarios

  9. Utilization of excess wind power in electric vehicles

    International Nuclear Information System (INIS)

    Hennings, Wilfried; Mischinger, Stefan; Linssen, Jochen

    2013-01-01

    This article describes the assessment of future wind power utilization for charging electric vehicles (EVs) in Germany. The potential wind power production in the model years 2020 and 2030 is derived by extrapolating onshore wind power generation and offshore wind speeds measured in 2007 and 2010 to the installed onshore and offshore wind turbine capacities assumed for 2020 and 2030. The energy consumption of an assumed fleet of 1 million EVs in 2020 and 6 million in 2030 is assessed using detailed models of electric vehicles, real world driving cycles and car usage. It is shown that a substantial part of the charging demand of EVs can be met by otherwise unused wind power, depending on the amount of conventional power required for stabilizing the grid. The utilization of wind power is limited by the charging demand of the cars and the bottlenecks in the transmission grid. -- Highlights: •Wind power available for charging depends on minimum required conventional power (must-run). •With 20 GW must-run power, 50% of charging can be met by excess wind power. •Grid bottlenecks decrease charging met by wind power from 50 % to 30 %. •With zero must-run power, only very little wind power is available for charging

  10. A modular Space Station/Base electrical power system - Requirements and design study.

    Science.gov (United States)

    Eliason, J. T.; Adkisson, W. B.

    1972-01-01

    The requirements and procedures necessary for definition and specification of an electrical power system (EPS) for the future space station are discussed herein. The considered space station EPS consists of a replaceable main power module with self-contained auxiliary power, guidance, control, and communication subsystems. This independent power source may 'plug into' a space station module which has its own electrical distribution, control, power conditioning, and auxiliary power subsystems. Integration problems are discussed, and a transmission system selected with local floor-by-floor power conditioning and distribution in the station module. This technique eliminates the need for an immediate long range decision on the ultimate space base power sources by providing capability for almost any currently considered option.

  11. 12 CFR 567.3 - Individual minimum capital requirements.

    Science.gov (United States)

    2010-01-01

    ... association's directors, officers, and senior management as well as the internal control and internal audit... associations; has management deficiencies, including failure to adequately monitor and control financial and... capital requirement for a savings association that varies from the risk-based capital requirement, the...

  12. Linear CMOS RF power amplifiers a complete design workflow

    CERN Document Server

    Ruiz, Hector Solar

    2013-01-01

    The work establishes the design flow for the optimization of linear CMOS power amplifiers from the first steps of the design to the final IC implementation and tests. The authors also focuses on design guidelines of the inductor's geometrical characteristics for power applications and covers their measurement and characterization. Additionally, a model is proposed which would facilitate designs in terms of transistor sizing, required inductor quality factors or minimum supply voltage. The model considers limitations that CMOS processes can impose on implementation. The book also provides diffe

  13. The electrohydraulic balance of the solar heat storage with autonomous power supply

    Directory of Open Access Journals (Sweden)

    M. K. Marahtanov

    2014-01-01

    Full Text Available The introduction of the paper emphasizes an increasingly important role of alternative power sources nowadays. At the same time, a solar collector (suntrap is one of the most frequent techniques to use the solar energy. It is an absorber that picks up solar radiation and heats a heat carrier circulating in the close loop. Then the heat is transferred to the heat accumulator that is integrated in the hot-tap water system (HWS.The paper presents a prospective circuit of the solar collector. It differs from the traditional one because, in addition to absorbing panel, it uses photoconverters to generate electric power for the circulating pump. The advantage of this system is that for operation such a solar energy converter has no need in external power sources, i.e. it is autonomous. The need to calculate the essential thermo-physical parameters that ensure no-break system operation was stated as a main objective of the work.The suggested circuit has a photocell panel to convert solar radiation into dc voltage of 12 V. In case of a lack of the solar energy an accumulator battery can be used for feeding. To ensure the no-break supply of power an adaptor is offered.To calculate a density distribution of solar radiation a sine law is offered depending on the time of day and geographical locality. This dependence was used to obtain the expressions for calculating the water temperature in boiler over daytime.Further, the calculations have been done for the operating conditions under which an efficient heat exchange will be provided with the minimum consumption of electric power for the heat carrier circulation in the first loop. For this purpose, a pump power was calculated depending on consumption and hydraulic losses of head in the pipeline. As a minimum required consumption the value has been chosen at which a laminar flow regime changes to the turbulent one because of the most efficient heat exchange being both in collector and in heat accumulator

  14. Economic analysis of power generation from floating solar chimney power plant

    International Nuclear Information System (INIS)

    Zhou, Xinping; Yang, Jiakuan; Xiao, Bo; Wang, Fen

    2009-01-01

    Solar chimney thermal power technology that has a long life span is a promising large-scale solar power generating technology. This paper performs economic analysis of power generation from floating solar chimney power plant (FSCPP) by analyzing cash flows during the whole service period of a 100 MW plant. Cash flows are influenced by many factors including investment, operation and maintenance cost, life span, payback period, inflation rate, minimum attractive rate of return, non-returnable subsidy rate, interest rate of loans, sale price of electricity, income tax rate and whether additional revenue generated by carbon credits is included or not. Financial incentives and additional revenue generated by carbon credits can accelerate the development of the FSCPP. Sensitivity analysis to examine the effects of the factors on cash flows of a 100 MW FSCPP is performed in detail. The results show that the minimum price for obtaining minimum attractive rate of return (MARR) of 8% reaches 0.83 yuan (kWh) -1 under financial incentives including loans at a low interest rate of 2% and free income tax. Comparisons of economics of the FSCPP and reinforced concrete solar chimney power plant or solar photovoltaic plant are also performed by analyzing their cash flows. It is concluded that FSCPP is in reality more economical than reinforced concrete solar chimney power plant (RCSCPP) or solar photovoltaic plant (SPVP) with the same power capacity. (author)

  15. Nuclear power infrastructure and planning

    International Nuclear Information System (INIS)

    2005-01-01

    There are several stages in the process of introducing nuclear power in a country. These include feasibility studies; technology evaluation; request for proposals and proposal evaluation; project and contracts development and financing; supply, construction, and commissioning; and finally operation. The IAEA is developing guidance directed to provide criteria for assessing the minimum infrastructure necessary for: a) a host country to consider when engaging in the implementation of nuclear power, or b) a supplier country to consider when assessing that the recipient country would be in an acceptable condition to begin the implementation of nuclear power. There are Member States that may be denied the benefits of nuclear energy if the infrastructure requirements are too large or onerous for the national economy. However if co-operation could be achieved, the infrastructure burden could be shared and economic benefits gained by several countries acting jointly. The IAEA is developing guidance on the potential for sharing of nuclear power infrastructure among countries adopting or extending nuclear power programme

  16. 10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Immediate notification requirements for operating nuclear power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... systems. (8) Emergency ac electrical power systems, including: Emergency diesel generators (EDGs...

  17. Mathematically modelling the power requirement for a vertical shaft mowing machine

    Directory of Open Access Journals (Sweden)

    Jorge Simón Pérez de Corcho Fuentes

    2008-09-01

    Full Text Available This work describes a mathematical model for determining the power demand for a vertical shaft mowing machine, particularly taking into account the influence of speed on cutting power, which is different from that of other models of mowers. The influence of the apparatus’ rotation and translation speeds was simulated in determining power demand. The results showed that no chan-ges in cutting power were produced by varying the knives’ angular speed (if translation speed was constant, while cutting power became increased if translation speed was increased. Variations in angular speed, however, influenced other parameters deter-mining total power demand. Determining this vertical shaft mower’s cutting pattern led to obtaining good crop stubble quality at the mower’s lower rotation speed, hence reducing total energy requirements.

  18. Power pulsing of the CMOS sensor Mimosa 26

    International Nuclear Information System (INIS)

    Kuprash, Oleg

    2013-01-01

    Mimosa 26 is a monolithic active pixel sensor developed by IPHC (Strasbourg) and IRFU (Saclay) as a prototype for the ILC vertex detector studies. The resolution requirements for the ILC tracking detector are very extreme, demanding very low material in the detector, thus only air cooling can be considered. Power consumption has to be reduced as far as possible. The beam structure of the ILC allows the possibility of power pulsing: only for about the 1 ms long bunch train full power is required, and during the 199 ms long pauses between the bunch trains the power can be reduced to a minimum. Not being adapted for the power pulsing, the sensor shows in laboratory tests a good performance under power pulsing. The power pulsing allows to significantly reduce the heating of the chip and divides power consumption approximately by a factor of 6. In this report a summary of power pulsing studies using the digital readout of Mimosa 26 is given. -- Highlights: • First power pulsing studies using digital readout of Mimosa 26 CMOS sensor were done. • Fake hit rates under power pulsing conditions and under normal conditions were compared. • The measurements demonstrate that there is so far no showstopper to operate CMOS pixel sensors in power pulsing mode

  19. Engineering testing requirements in FED/INTOR

    International Nuclear Information System (INIS)

    Abdou, M.A.; Nygren, R.E.; Morgan, G.D.; Trachsel, C.A.; Wire, G.; Oppermann, E.; Puigh, R.; Gold, R.E.

    1982-10-01

    The FED/INTOR critical issues activity has addressed three key testing requirements that have the largest impact on the design, operation and cost of FED/INTOR. These are: (1) the total testing time (fluence) during the device lifetime, (2) the minimum number of back-to-back cycles, and (3) the neutron wall load (power density in the first wall/blanket). The testing program activities were structured into three tasks in order to define the benefits, and in some cases, costs and risks of these testing requirements. The three tasks were carried out with wide participation of experts from a number of organizations in the United States. Similar effort was performed by Japan, the European Community and the Soviet Union

  20. Optimization criteria for solar and wind power systems

    Energy Technology Data Exchange (ETDEWEB)

    Salieva, R B

    1976-01-01

    It is shown that the design of solar and wind power systems requires both the specification of the target function and the optimization of the system with respect to two criteria, namely, the system must be economical (minimum cost to the economy) and it must be reliable (the probability of failure-free operation of the system must be not less than a standard value).

  1. Ideal MHD Stability Prediction and Required Power for EAST Advanced Scenario

    International Nuclear Information System (INIS)

    Chen Junjie; Li Guoqiang; Qian Jinping; Liu Zixi

    2012-01-01

    The Experimental Advanced Superconducting Tokamak (EAST) is the first fully superconducting tokamak with a D-shaped cross-sectional plasma presently in operation. The ideal magnetohydrodynamic (MHD) stability and required power for the EAST advanced tokamak (AT) scenario with negative central shear and double transport barrier (DTB) are investigated. With the equilibrium code TOQ and stability code GATO, the ideal MHD stability is analyzed. It is shown that a moderate ratio of edge transport barriers' (ETB) height to internal transport barriers' (ITBs) height is beneficial to ideal MHD stability. The normalized beta β N limit is about 2.20 (without wall) and 3.70 (with ideal wall). With the scaling law of energy confinement time, the required heating power for EAST AT scenario is calculated. The total heating power P t increases as the toroidal magnetic field B T or the normalized beta β N is increased. (magnetically confined plasma)

  2. Ideal MHD Stability Prediction and Required Power for EAST Advanced Scenario

    Science.gov (United States)

    Chen, Junjie; Li, Guoqiang; Qian, Jinping; Liu, Zixi

    2012-11-01

    The Experimental Advanced Superconducting Tokamak (EAST) is the first fully superconducting tokamak with a D-shaped cross-sectional plasma presently in operation. The ideal magnetohydrodynamic (MHD) stability and required power for the EAST advanced tokamak (AT) scenario with negative central shear and double transport barrier (DTB) are investigated. With the equilibrium code TOQ and stability code GATO, the ideal MHD stability is analyzed. It is shown that a moderate ratio of edge transport barriers' (ETB) height to internal transport barriers' (ITBs) height is beneficial to ideal MHD stability. The normalized beta βN limit is about 2.20 (without wall) and 3.70 (with ideal wall). With the scaling law of energy confinement time, the required heating power for EAST AT scenario is calculated. The total heating power Pt increases as the toroidal magnetic field BT or the normalized beta βN is increased.

  3. Solar power satellite life-cycle energy recovery consideration

    Science.gov (United States)

    Weingartner, S.; Blumenberg, J.

    The construction, in-orbit installation and maintenance of a solar power satellite (SPS) will demand large amounts of energy. As a minimum requirement for an energy effective power satellite it is asked that this amount of energy be recovered. The energy effectiveness in this sense resulting in a positive net energy balance is a prerequisite for cost-effective power satellite. This paper concentrates on life-cycle energy recovery instead on monetary aspects. The trade-offs between various power generation systems (different types of solar cells, solar dynamic), various construction and installation strategies (using terrestrial or extra-terrestrial resources) and the expected/required lifetime of the SPS are reviewed. The presented work is based on a 2-year study performed at the Technical University of Munich. The study showed that the main energy which is needed to make a solar power satellite a reality is required for the production of the solar power components (up to 65%), especially for the solar cell production. Whereas transport into orbit accounts in the order of 20% and the receiving station on earth (rectenna) requires about 15% of the total energy investment. The energetic amortization time, i.e. the time the SPS has to be operational to give back the amount of energy which was needed for its production installation and operation, is about two years.

  4. Solar power satellite—Life-cycle energy recovery considerations

    Science.gov (United States)

    Weingartner, S.; Blumenberg, J.

    1995-05-01

    The construction, in-orbit installation and maintenance of a solar power satellite (SPS) will demand large amounts of energy. As a minimum requirement for an energy effective power satellite it is asked that this amount of energy be recovered. The energy effectiveness in this sense resulting in a positive net energy balance is a prerequisite for a cost-effective power satellite. This paper concentrates on life-cycle energy recovery instead of monetary aspects. The trade-offs between various power generation systems (different types of solar cells, solar dynamic), various construction and installation strategies (using terrestrial or extra-terrestrial resources) and the expected/required lifetime of the SPS are reviewed. The presented work is based on a 2-year study performed at the Technical University of Munich. The study showed that the main energy which is needed to make a solar power satellite a reality is required for the production of the solar power plant components (up to 65%), especially for the solar cell production. Whereas transport into orbit accounts in the order of 20% and the receiving station on Earth (rectenna) requires in the order of 15% of the total energy investment. The energetic amortization time, i.e. the time the SPS has to be operational to give back the amount of energy which was needed for its production, installation and operation, is in the order of two years.

  5. Experimental tests on winter cereal: Sod seeding compared to minimum tillage and traditional plowing

    Directory of Open Access Journals (Sweden)

    Antoniotto Guidobono Cavalchini

    2013-09-01

    Full Text Available Compared to traditional plowing and minimum tillage, the sod seeding technique has been tested in order to evaluate the differences in energy consumption, labor and machinery requirement and CO2 emission reduction. The experiments were conducted on winter cereal seeding in a Po valley farm in October 2011. The tests were carried out as follows: wheat variety seeding, over corn and alfalfa crops, in large plots with three repetitions for each thesis. They included: sod seeding anticipated by round up weeding in the case of the plots over alfalfa; traditional plowing at 35 cm followed by rotary tillage and combined seeding (seeder plus rotary tiller; minimum tillage based on ripping at the same depth (35 cm and combined seeder ( seeder plus rotary tiller. The following farm operations - fertilizer, and other agrochemical distributionshave been the same in all the considered theses. The results, statistically significant (P<0.001 in terms of yields, highlighted slight differences: the best data in the case of the traditional plowing both in the case of wheat crop over corn and alfalfa (84.43 and 6.75 t/ha; slightly lower yields for the sod seeding (6.23 and 79.9 t/ha for corn and alfalfa respectively; lower in the case of minimum tillage (5.87; 79.77 t/ha in the two situations. Huge differences in energy and oil consumption have been recorded: in the case of succession to corn 61.47; 35.31; 4.27 kg oil/ha respectively for, traditional plowing, minimum tillage and sod seeding; in the case of alfalfa 61.2; 50.96; 5.14 kg oil/ha respectively for traditional plowing, minimum tillage and sod seeding. The innovative technique, highlighted huge energy saving with an oil consumption equal to 92% and 89% (P<0.001 of what happens in traditional plowing and minimum tillage. Large differences concern labor and machine productivity. These parameters together with oil consumption and machine size [power (kW and weight (t] lead to even greater differences in

  6. 50 CFR 259.34 - Minimum and maximum deposits; maximum time to deposit.

    Science.gov (United States)

    2010-10-01

    ... B objective. A time longer than 10 years, either by original scheduling or by subsequent extension... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE AID TO FISHERIES CAPITAL CONSTRUCTION FUND...) Minimum annual deposit. The minimum annual (based on each party's taxable year) deposit required by the...

  7. The Swiss electrical power industry: energy policy problems and prospects

    International Nuclear Information System (INIS)

    Tognola, F.

    1986-01-01

    The emotive consequences of the Chernobyl accident have had a devastating effect on Swiss public opinion and endanger the serious effort by the Swiss electrical power industry over many years at making possible a power supply capable of meeting increasing demand at minimum cost, compatible with security of supply and protection of the environment. It is considered that two new nuclear power stations will be required, one in 1995 and the other in 2000. The serious consequences if these are not built and, particularly, if it were decided to shut down all existing Swiss nuclear stations are stressed. (P.G.R.)

  8. Hydroelectric power in Switzerland: large growth potential by increasing the installed power

    International Nuclear Information System (INIS)

    Schleiss, A.

    2007-01-01

    Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates required by a new legislation to protect the rivers. The enforcement is due at latest when the present licenses for water utilization expire. On the other hand, the installed (peak) power might be further increased by 50% by retrofitting the existing installations and constructing the pumped-storage plants currently at the planning stage

  9. Design requirements, criteria and methods for seismic qualification of CANDU power plants

    International Nuclear Information System (INIS)

    Singh, N.; Duff, C.G.

    1979-10-01

    This report describes the requirements and criteria for the seismic design and qualification of systems and equipment in CANDU nuclear power plants. Acceptable methods and techniques for seismic qualification of CANDU nuclear power plants to mitigate the effects or the consequences of earthquakes are also described. (auth)

  10. Analysis of clinical data to determine the minimum number of sensors required for adequate skin temperature monitoring of superficial hyperthermia treatments.

    Science.gov (United States)

    Bakker, Akke; Holman, Rebecca; Rodrigues, Dario B; Dobšíček Trefná, Hana; Stauffer, Paul R; van Tienhoven, Geertjan; Rasch, Coen R N; Crezee, Hans

    2018-04-27

    Tumor response and treatment toxicity are related to minimum and maximum tissue temperatures during hyperthermia, respectively. Using a large set of clinical data, we analyzed the number of sensors required to adequately monitor skin temperature during superficial hyperthermia treatment of breast cancer patients. Hyperthermia treatments monitored with >60 stationary temperature sensors were selected from a database of patients with recurrent breast cancer treated with re-irradiation (23 × 2 Gy) and hyperthermia using single 434 MHz applicators (effective field size 351-396 cm 2 ). Reduced temperature monitoring schemes involved randomly selected subsets of stationary skin sensors, and another subset simulating continuous thermal mapping of the skin. Temperature differences (ΔT) between subsets and complete sets of sensors were evaluated in terms of overall minimum (T min ) and maximum (T max ) temperature, as well as T90 and T10. Eighty patients were included yielding a total of 400 hyperthermia sessions. Median ΔT was 50 sensors were used. Subsets of sensors result in underestimation of T max up to -2.1 °C (ΔT 95%CI), which decreased to -0.5 °C when >50 sensors were used. Thermal profiles (8-21 probes) yielded a median ΔT 50 stationary sensors or thermal profiles. Adequate coverage of the skin temperature distribution during superficial hyperthermia treatment requires the use of >50 stationary sensors per 400 cm 2 applicator. Thermal mapping is a valid alternative.

  11. MINIMUM AREAS FOR ELEMENTARY SCHOOL BUILDING FACILITIES.

    Science.gov (United States)

    Pennsylvania State Dept. of Public Instruction, Harrisburg.

    MINIMUM AREA SPACE REQUIREMENTS IN SQUARE FOOTAGE FOR ELEMENTARY SCHOOL BUILDING FACILITIES ARE PRESENTED, INCLUDING FACILITIES FOR INSTRUCTIONAL USE, GENERAL USE, AND SERVICE USE. LIBRARY, CAFETERIA, KITCHEN, STORAGE, AND MULTIPURPOSE ROOMS SHOULD BE SIZED FOR THE PROJECTED ENROLLMENT OF THE BUILDING IN ACCORDANCE WITH THE PROJECTION UNDER THE…

  12. Minimum forest cover required for sustainable water flow regulation of a watershed: a case study in Jambi Province, Indonesia

    Science.gov (United States)

    Tarigan, Suria; Wiegand, Kerstin; Sunarti; Slamet, Bejo

    2018-01-01

    In many tropical regions, the rapid expansion of monoculture plantations has led to a sharp decline in forest cover, potentially degrading the ability of watersheds to regulate water flow. Therefore, regional planners need to determine the minimum proportion of forest cover that is required to support adequate ecosystem services in these watersheds. However, to date, there has been little research on this issue, particularly in tropical areas where monoculture plantations are expanding at an alarming rate. Therefore, in this study, we investigated the influence of forest cover and oil palm (Elaeis guineensis) and rubber (Hevea brasiliensis) plantations on the partitioning of rainfall into direct runoff and subsurface flow in a humid, tropical watershed in Jambi Province, Indonesia. To do this, we simulated streamflow with a calibrated Soil and Water Assessment Tool (SWAT) model and observed several watersheds to derive the direct runoff coefficient (C) and baseflow index (BFI). The model had a strong performance, with Nash-Sutcliffe efficiency values of 0.80-0.88 (calibration) and 0.80-0.85 (validation) and percent bias values of -2.9-1.2 (calibration) and 7.0-11.9 (validation). We found that the percentage of forest cover in a watershed was significantly negatively correlated with C and significantly positively correlated with BFI, whereas the rubber and oil palm plantation cover showed the opposite pattern. Our findings also suggested that at least 30 % of the forest cover was required in the study area for sustainable ecosystem services. This study provides new adjusted crop parameter values for monoculture plantations, particularly those that control surface runoff and baseflow processes, and it also describes the quantitative association between forest cover and flow indicators in a watershed, which will help regional planners in determining the minimum proportion of forest and the maximum proportion of plantation to ensure that a watershed can provide

  13. Power feature required for PEFC powered electric propulsion ship

    Energy Technology Data Exchange (ETDEWEB)

    Yoshida, Isao [NKK Corp., Yokohama (Japan); Oka, Masaru [Mitsubishi Heavy Industries, Ltd., Nagasaki (Japan)

    1996-12-31

    This report covers part of a joint study on a PEFC system for ship propulsion, summarized in a presentation to this Seminar, entitled {open_quote}Study on a Polymer Electrolyte Fuel Cell (PEFC) Propulsion System for Surface Ships{close_quotes}, and which envisages application to a 1,500 DWT cargo vessel. The aspect treated here concerns an analysis of the load-following performance required and estimated of a PEFC system to power the envisaged ship. The analysis proved that difficulty should be expected of the fuel supply circuit in following with adequate rapidity the sharp changes of load on fuel cell under certain conditions. Further integrated experiments and simulation exercises are currently in progress to further analyze the response characteristics of the fuel supply circuit-particularly of the methanol reformer and gas reservoir-to determine the best measure to be adopted for overcoming the expected difficulty.

  14. Rectenna System Design. [energy conversion solar power satellites

    Science.gov (United States)

    Woodcock, G. R.; Andryczyk, R. W.

    1980-01-01

    The fundamental processes involved in the operation of the rectenna system designed for the solar power satellite system are described. The basic design choices are presented based on the desired microwave rf field concentration prior to rectification and based on the ground clearance requirements for the rectenna structure. A nonconcentrating inclined planar panel with a 2 meter minimum clearance configuration is selected as a representative of the typical rectenna.

  15. Thermal power plant operating regimes in future British power systems with increasing variable renewable penetration

    International Nuclear Information System (INIS)

    Edmunds, Ray; Davies, Lloyd; Deane, Paul; Pourkashanian, Mohamed

    2015-01-01

    Highlights: • This work investigates thermal power operating regimes in future power systems. • Gas plants have low utilisation in the scenarios considered. • Ramping intensity increases for gas plants and pumped storage. • Coal plants frequently operate at minimum stable levels and start-ups increase. • Grid emission intensity and total emission production remains substantial. - Abstract: This work investigates the operational requirements of thermal power plants in a number of potential future British power systems with increasing variable renewable penetration. The PLEXOS Integrated Energy Model has been used to develop the market models, with PLEXOS employing mixed integer programming to solve the unit commitment and economic dispatch problem, subject to a number of constraints. Initially, a model of the British power system was developed and validated. Subsequently, a 2020 test model was developed to analyse a number of future system structures with differing fuel and carbon prices and generation mixes. The study has found that in three of the four scenarios considered, the utilisation of gas power plants will be relatively low, but remains fundamental to the security of supply. Also, gas plants will be subject to more intense ramping. The findings have consequent implications for energy policy as expensive government interventions may be required to prevent early decommissioning of gas capacity, should the prevailing market conditions not guarantee revenue adequacy.

  16. Decision making algorithms for hydro-power plant location

    CERN Document Server

    Majumder, Mrinmoy

    2013-01-01

    The present study has attempted to apply the advantage of neuro-genetic algorithms for optimal decision making in maximum utilization of natural resources. Hydro-power is one of the inexpensive, but a reliable source of alternative energy which is foreseen as the possible answer to the present crisis in the energy sector. However, the major problem related to hydro-energy is its dependency on location. An ideal location can produce maximum energy with minimum loss. Besides, such power-plant also requires substantial amount of land which is a precious resource nowadays due to the rapid and unco

  17. Manpower requirements of quality assurance personnel for the nuclear power plants

    International Nuclear Information System (INIS)

    Aly, A.E.; El-sayed, A.A.; Shabaan, I.H.

    1987-01-01

    Basic principles for structuring and staffing of the quality assurance (Q.A.)organisation in the nuclear power plant (NPP) are presented. the manpower requirements of the Q.A.organisation in the NPP during both construction and operational stages are determined. the manpower requirements for Q.A./Q.C. functions in a NPP are found to be proportional to the number of craft workers needed to perform the required level of the construction. The Q.A./Q.C. personnel are about 15% of the total number of the craft workers required during construction

  18. Laser requirements for a laser fusion energy power plant

    Institute of Scientific and Technical Information of China (English)

    Stephen; E.Bodner; Andrew; J.Schmitt; John; D.Sethian

    2013-01-01

    We will review some of the requirements for a laser that would be used with a laser fusion energy power plant, including frequency, spatial beam smoothing, bandwidth, temporal pulse shaping, efficiency, repetition rate, and reliability. The lowest risk and optimum approach uses a krypton fluoride gas laser. A diode-pumped solid-state laser is a possible contender.

  19. Runge-Kutta methods with minimum storage implementations

    KAUST Repository

    Ketcheson, David I.

    2010-03-01

    Solution of partial differential equations by the method of lines requires the integration of large numbers of ordinary differential equations (ODEs). In such computations, storage requirements are typically one of the main considerations, especially if a high order ODE solver is required. We investigate Runge-Kutta methods that require only two storage locations per ODE. Existing methods of this type require additional memory if an error estimate or the ability to restart a step is required. We present a new, more general class of methods that provide error estimates and/or the ability to restart a step while still employing the minimum possible number of memory registers. Examples of such methods are found to have good properties. © 2009 Elsevier Inc. All rights reserved.

  20. Maximum power point tracking

    International Nuclear Information System (INIS)

    Enslin, J.H.R.

    1990-01-01

    A well engineered renewable remote energy system, utilizing the principal of Maximum Power Point Tracking can be m ore cost effective, has a higher reliability and can improve the quality of life in remote areas. This paper reports that a high-efficient power electronic converter, for converting the output voltage of a solar panel, or wind generator, to the required DC battery bus voltage has been realized. The converter is controlled to track the maximum power point of the input source under varying input and output parameters. Maximum power point tracking for relative small systems is achieved by maximization of the output current in a battery charging regulator, using an optimized hill-climbing, inexpensive microprocessor based algorithm. Through practical field measurements it is shown that a minimum input source saving of 15% on 3-5 kWh/day systems can easily be achieved. A total cost saving of at least 10-15% on the capital cost of these systems are achievable for relative small rating Remote Area Power Supply systems. The advantages at larger temperature variations and larger power rated systems are much higher. Other advantages include optimal sizing and system monitor and control

  1. Conditions and requirements for a potential application of solar power satellites /SPS/ for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Westphal, W. (Berlin, Technische Universitaet, Berlin, West Germany); Ruth, J. (ESA, European Space Research and Technology Centre, Noordwijk, Netherlands)

    1980-12-01

    The potential problems of a future introduction of Solar Power Satellites (SPS) as baseload power plants for Western European countries are considered, emphasizing the differences of SPS utilization in Europe compared with that in the USA as a result of geographical, orbital organizational, and industrial conditions. If estimated SPS safety zone areas are required, then the SPS system incorporating the 2.45 GHz microwave power transmission appears crucial for utilization in Western Europe in order to eliminate the large rectenna area requirements of an SPS 5 GW power system. A frequency variation of up to 5 or 10 GHz, and the application of either laser power transmission or solid state devices which could alleviate rectenna siting problems and restrictions on the use of the geosynchronous orbit are discussed.

  2. Requirements on future energy supply. Analysis on the demand of future power plant capacity and strategy for a sustainable power utilization in Germany

    International Nuclear Information System (INIS)

    2003-08-01

    This strategy paper was drawn up with a view to maximum ecological compatibility of pwer plant modernization and sustainable power generation and use. The first part of the paper analyzes the power plants to be decommissioned on a medium-term basis and - against the background of several different scenarios for future power demand - an estimate of power plant capacities required by 2020. The second part describes the goals and concrete requirements of sustainable energy use. In the final part, the available instruments are presented, and those instruments are recommended that will be best suited for making power demand and supply efficient, sustainable and environment-friend.y [de

  3. Report of the Committee to review safeguards requirements at power reactors

    International Nuclear Information System (INIS)

    1983-05-01

    In October 1982, NRC's Executive Director for Operations appointed a five-member Committee to review NRC security requirements at nuclear power plants with a view toward evaluating the impact of these requirements on operational safety. During visits to five power reactor sites and more than a dozen days of meetings over a period of four months, the Committee observed plant operating conditions and obtained views from abut 100 persons representing 16 nuclear utilities and industry organizations. They also interviewed about 40 NRC employees, including Resident Inspectors, and members of the Regional and Headquarters staffs. Overall, the Committee did not identify any clear operational safety problems associated with implementation of the NRC's security requirements. However, they did find that the potential existed, to varying degrees, at licensed facilities. The Committee's report, dated February 28, 1983, contains five basic findings and a number of associated recommendations intended to minimize the potential impact of security on safety

  4. Is the minimum enough? Affordability of a nutritious diet for minimum wage earners in Nova Scotia (2002-2012).

    Science.gov (United States)

    Newell, Felicia D; Williams, Patricia L; Watt, Cynthia G

    2014-05-09

    This paper aims to assess the affordability of a nutritious diet for households earning minimum wage in Nova Scotia (NS) from 2002 to 2012 using an economic simulation that includes food costing and secondary data. The cost of the National Nutritious Food Basket (NNFB) was assessed with a stratified, random sample of grocery stores in NS during six time periods: 2002, 2004/2005, 2007, 2008, 2010 and 2012. The NNFB's cost was factored into affordability scenarios for three different household types relying on minimum wage earnings: a household of four; a lone mother with three children; and a lone man. Essential monthly living expenses were deducted from monthly net incomes using methods that were standardized from 2002 to 2012 to determine whether adequate funds remained to purchase a basic nutritious diet across the six time periods. A 79% increase to the minimum wage in NS has resulted in a decrease in the potential deficit faced by each household scenario in the period examined. However, the household of four and the lone mother with three children would still face monthly deficits ($44.89 and $496.77, respectively, in 2012) if they were to purchase a nutritiously sufficient diet. As a social determinant of health, risk of food insecurity is a critical public health issue for low wage earners. While it is essential to increase the minimum wage in the short term, adequately addressing income adequacy in NS and elsewhere requires a shift in thinking from a focus on minimum wage towards more comprehensive policies ensuring an adequate livable income for everyone.

  5. 42 CFR 84.157 - Airflow resistance test; Type C supplied-air respirator, pressure-demand class; minimum...

    Science.gov (United States)

    2010-10-01

    ... test; Type C supplied-air respirator, pressure-demand class; minimum requirements. (a) The static... 42 Public Health 1 2010-10-01 2010-10-01 false Airflow resistance test; Type C supplied-air respirator, pressure-demand class; minimum requirements. 84.157 Section 84.157 Public Health PUBLIC HEALTH...

  6. 17 CFR 31.9 - Minimum financial requirements.

    Science.gov (United States)

    2010-04-01

    ... term “customer” means customer as defined in § 31.4(d); (ii) The term “proprietary account” means a... the definition of customer (as defined in paragraph (b)(2)(i) of this section) or proprietary account... demonstrates to the satisfaction of the Commission that it complies with the financial requirements of this...

  7. Power system reliability impacts of wind generation and operational reserve requirements

    Directory of Open Access Journals (Sweden)

    Esteban Gil

    2015-06-01

    Full Text Available Due to its variability, wind generation integration presents a significant challenge to power system operators in order to maintain adequate reliability levels while ensuring least cost operation. This paper explores the trade-off between the benefits associated to a higher wind penetration and the additional operational reserve requirements that they impose. Such exploration is valued in terms of its effect on power system reliability, measured as an amount of unserved energy. The paper also focuses on how changing the Value of Lost Load (VoLL can be used to attain different reliability targets, and how wind power penetration and the diversity of the wind energy resource will impact quality of supply (in terms of instances of unserved energy. The evaluation of different penetrations of wind power generation, different wind speed profiles, wind resource diversity, and different operational reserve requirements, is conducted on the Chilean Northern Interconnected System (SING using statistical modeling of wind speed time series and computer simulation through a 24-hour ahead unit commitment algorithm and a Monte Carlo simulation scheme. Results for the SING suggest that while wind generation can significantly reduce generation costs, it can also imply higher security costs to reach acceptable reliability levels.

  8. Manpower requirements for nuclear power programmes in nations of intermediate capacity

    International Nuclear Information System (INIS)

    Cantarell, I.; Cerrolaza, J.A.; Llado, J.M.

    1980-01-01

    A study is made of the manpower required for initiating and carrying out a nuclear power programme in countries which have not developed their own nuclear technology but where the technical and economic level is such to permit a substantial input from local industry. The discussion is based on Spanish experience. The three basic elements in a nuclear programme are taken to be the operating company, the regulating authority and the engineering firm involved. The role of each of these is briefly considered and the manpower requirements during the design, construction and operational phases of a power station are evaluated. A short account is also given of the manpower requirements of other enterprises such as those involved in the civil engineering, the assembly and construction control. The variations in the labour force are described with the aim of deriving estimates of the number of people involved in the development of a nuclear power programme as a function of time: actual numbers are given for the case of the Spanish national energy plan. A brief description is given of the various courses on nuclear science and engineering provided in Spain and the requirements laid down by the regulations. A short account is given of Spanish nuclear development, with emphasis on the work carried out by the Nuclear Energy Board, not only as a research organization but also in its promotional and training capacities and as a source of personnel for industry. Finally, some comments are made on the possibilities opened up by international co-operation. (author)

  9. Attainability and minimum energy of multiple-stage cascade membrane Systems

    KAUST Repository

    Alshehri, Ali

    2015-08-12

    Process design and simulation of multi-stage membrane systems have been widely studied in many gas separation systems. However, general guidelines have not been developed yet for the attainability and the minimum energy consumption of a multi-stage membrane system. Such information is important for conceptual process design and thus it is the topic of this work. Using a well-mixed membrane model, it was determined that the attainability curve of multi-stage systems is defined by the pressure ratio and membrane selectivity. Using the constant recycle ratio scheme, the recycle ratio can shift the attainability behavior between single-stage and multi-stage membrane systems. When the recycle ratio is zero, all of the multi-stage membrane processes will decay to a single-stage membrane process. When the recycle ratio approaches infinity, the required selectivity and pressure ratio reach their absolute minimum values, which have a simple relationship with that of a single-stage membrane process, as follows: View the MathML sourceSn=S1, View the MathML sourceγn=γ1, where n is the number of stages. The minimum energy consumption of a multi-stage membrane process is primarily determined by the membrane selectivity and recycle ratio. A low recycle ratio can significantly reduce the required membrane selectivity without substantial energy penalty. The energy envelope curve can provide a guideline from an energy perspective to determine the minimum required membrane selectivity in membrane process designs to compete with conventional separation processes, such as distillation.

  10. EUR, an European utility requirements documents for future LWR power stations

    International Nuclear Information System (INIS)

    Berbey, Pierre; Lienard, Michel; Redon, Ramon; Essmann, Juergen; Taylor, David T.

    2004-01-01

    A group of the major European utilities are developing a common requirement document which will be used for the LWR nuclear power plants to be built in Europe from the beginning of the next century. This document provides harmonised policies and technical requirements that will allow the implementation of a design developed in one country into another one. The objectives and contents of the document, the organisation set up for its production and the main requirements are summarised in the paper. (author)

  11. Structural materials requirements for in-vessel components of fusion power plants

    International Nuclear Information System (INIS)

    Schaaf, B. van der

    2000-01-01

    The economic production of fusion energy is determined by principal choices such as using magnetic plasma confinement or generating inertial fusion energy. The first generation power plants will use deuterium and tritium mixtures as fuel, producing large amounts of highly energetic neutrons resulting in radiation damage in materials. In the far future the advanced fuels, 3 He or 11 B, determine power plant designs with less radiation damage than in the first generation. The first generation power plants design must anticipate radiation damage. Solid sacrificing armour or liquid layers could limit component replacements costs to economic levels. There is more than radiation damage resistance to determine the successful application of structural materials. High endurance against cyclic loading is a prominent requirement, both for magnetic and inertial fusion energy power plants. For high efficiency and compactness of the plant, elevated temperature behaviour should be attractive. Safety and environmental requirements demand that materials have low activation potential and little toxic effects under both normal and accident conditions. The long-term contenders for fusion power plant components near the plasma are materials in the range from innovative steels, such as reduced activation ferritic martensitic steels, to highly advanced ceramic composites based on silicon carbide, and chromium alloys. The steels follow an evolutionary path to basic plant efficiencies. The competition on the energy market in the middle of the next century might necessitate the riskier but more rewarding development of SiCSiC composites or chromium alloys

  12. Simple annulus power balance in EBT-I

    International Nuclear Information System (INIS)

    Borowski, S.K.; Uckan, N.A.; Jaeger, E.F.; Kammash, T.

    1979-09-01

    An essential feature of the ELMO Bumpy Torus (EBT) concept is the presence of a relativistic electron annulus in each of the toroidal mirror sectors. These high beta annuli are formed and sustained by microwave heating and are of sufficient density and temperature that diamagnetic currents produce the necessary minimum in the magnetic field required for MHD stability of the toroidal core plasma. Because electron rings play an important role in confinement characteristics and performance of EBT, the trade-off between the quality of the confinement afforded by the rings and the power required to sustain the rings represents an important problem in a fusion reactor. Theoretical estimates of the microwave power required to sustain the annulus are found to be within a factor of 2 of the experimentally determined value. Scaling projections that are shown for both EBT-I and EBT-S enable one to examine the sensitivity of the annulus electron temperature as a function of core plasma density for various microwave power levels. The results are found to be sensitive to the details of the hot electron distribution function as well as geometric and scaling parameters. Improvements to the model are under way in order to increase its capability and accuracy in assessing the overall power balance

  13. Future CANDU nuclear power plant design requirements document executive summary

    International Nuclear Information System (INIS)

    Lee, Duk Su; Chang, Woo Hyun; Lee, Nam Young; S. A. Usmani

    1996-03-01

    The future CANDU Requirements Document (FCRED) describes a clear and complete statement of utility requirements for the next generation of CANDU nuclear power plants including those in Korea. The requirements are based on proven technology of PHWR experience and are intended to be consistent with those specified in the current international requirement documents. Furthermore, these integrated set of design requirements, incorporate utility input to the extent currently available and assure a simple, robust and more forgiving design that enhances the performance and safety. The FCRED addresses the entire plant, including the nuclear steam supply system and the balance of the plant, up to the interface with the utility grid at the distribution side of the circuit breakers which connect the switchyard to the transmission lines. Requirements for processing of low level radioactive waste at the plant site and spent fuel storage requirements are included in the FCRED. Off-site waste disposal is beyond the scope of the FCRED. 2 tabs., 1 fig. (Author) .new

  14. Seasonal optimal mix of wind and solar power in a future, highly renewable Europe

    DEFF Research Database (Denmark)

    Heide, Dominik; Bremen, Lueder von; Greiner, Martin

    2010-01-01

    behaviors are able to counterbalance each other to a certain extent to follow the seasonal load curve. The best point of counterbalancing represents the seasonal optimal mix between wind and solar power generation. It leads to a pronounced minimum in required stored energy. For a 100% renewable Europe...

  15. A wireless power transmission system for implantable devices in freely moving rodents.

    Science.gov (United States)

    Eom, Kyungsik; Jeong, Joonsoo; Lee, Tae Hyung; Kim, Jinhyung; Kim, Junghoon; Lee, Sung Eun; Kim, Sung June

    2014-08-01

    Reliable wireless power delivery for implantable devices in animals is highly desired for safe and effective experimental use. Batteries require frequent replacement; wired connections are inconvenient and unsafe, and short-distance inductive coupling requires the attachment of an exterior transmitter to the animal's body. In this article, we propose a solution by which animals with implantable devices can move freely without attachments. Power is transmitted using coils attached to the animal's cage and is received by a receiver coil implanted in the animal. For a three-dimensionally uniform delivery of power, we designed a columnar dual-transmitter coil configuration. A resonator-based inductive link was adopted for efficient long-range power delivery, and we used a novel biocompatible liquid crystal polymer substrate as the implantable receiver device. Using this wireless power delivery system, we obtain an average power transfer efficiency of 15.2% (minimum efficiency of 10% and a standard deviation of 2.6) within a cage of 15×20×15 cm3.

  16. Fukushima, two years later, modification requirements in nuclear power plants

    International Nuclear Information System (INIS)

    Sanchez J, J.; Camargo C, R.; Nunez C, A.; Mendoza F, J. E.; Salmeron V, J. A.

    2013-10-01

    The occurred events in the nuclear power plant of Fukushima Daiichi as consequence of the strong earthquake of 9 grades in the Richter scale and the later tsunami with waves estimated in more than 14 meters high began a series of important questions about the safety of the nuclear power plants in operation and of the new designs. Firstly, have allowed to be questioned on the magnitudes and consequences of the extreme external natural events; that can put in risk the integrity of the safety barriers of a nuclear power plant when being presented in a multiple way. As consequence of the events of the Fukushima Daiichi NPP, the countries with NPPs in operation and /or construction carried out evaluations about their safety operation. They have also realized evaluations about accidents and their impact in the safety, analysis and studies too that have forced to the regulatory bodies to continue a systematic and methodical revision of their procedures and regulations, to identify the possible improvements to the safety in response to the events happened in Japan; everything has taken it to determine the necessity to incorporate additional requirements to the nuclear power plants to mitigate events Beyond the Design Base. Due to Mexico has the nuclear power plant of Laguna Verde, with two units of BWR-5 type with contention Mark III, some the modifications can be applicable to these units to administrate and/or to mitigate the consequences of the possible occurrence of an accident Beyond the Design Base and that could generate a severe accident. In this work an exposition is presented on the modification requirements to confront external natural events Beyond the Design Base, and its application in our country. (Author)

  17. 42 CFR 84.146 - Method of measuring the power and torque required to operate blowers.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Method of measuring the power and torque required... RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84.146 Method of measuring the power and torque.... These are used to facilitate timing. To determine the torque or horsepower required to operate the...

  18. Current USAEC seismic requirements for nuclear power plants

    International Nuclear Information System (INIS)

    Mehta, D.S.

    1975-01-01

    The principal seismic and geologic considerations which guide the USAEC in its evaluation of the suitability of proposed sites for nuclear power plants and plant design bases are set forth as design criteria in the AEC regulatory guides. The basic requirements of seismic design and analysis for seismic Category I structures, components, and systems important to public safety have been established in the USAEC regulatory guides and Code of Federal Regulations. It is pointed out that the current state-of-art techniques, best available technology, and additional studies in the field of earthquake engineering can be utilized to resolve seismic concerns. The seismic design requirements for nuclear plants to withstand postulated earthquakes can be standardized and this will be a significant milestone in the continuation of the Nuclear Standardization Program. (author)

  19. Dispersion theory and sum rules for the non-minimum phase problem in optical spectroscopy

    International Nuclear Information System (INIS)

    Peiponen, Kai-Erik

    2009-01-01

    Dispersion relations and sum rules for integer powers of an optical response function are given in the case of the non-minimum phase problem. These relations were obtained using the concept of the Hilbert transform and Blaschke product. The theory presented in this paper is useful both in basic and applied studies of non-minimum phase functions in optics, and also other fields of physics such as high energy physics.

  20. Underwater Cycle Ergometry: Power Requirements With and Without Diver Thermal Dress

    National Research Council Canada - National Science Library

    Shykoff, B

    2009-01-01

    .... An ongoing problem has been that, although the power requirement of cycling in the water is known to be greater than that in air for the same ergometer setting, the magnitude of the difference...

  1. A new method of optimal capacitor switching based on minimum spanning tree theory in distribution systems

    Science.gov (United States)

    Li, H. W.; Pan, Z. Y.; Ren, Y. B.; Wang, J.; Gan, Y. L.; Zheng, Z. Z.; Wang, W.

    2018-03-01

    According to the radial operation characteristics in distribution systems, this paper proposes a new method based on minimum spanning trees method for optimal capacitor switching. Firstly, taking the minimal active power loss as objective function and not considering the capacity constraints of capacitors and source, this paper uses Prim algorithm among minimum spanning trees algorithms to get the power supply ranges of capacitors and source. Then with the capacity constraints of capacitors considered, capacitors are ranked by the method of breadth-first search. In term of the order from high to low of capacitor ranking, capacitor compensation capacity based on their power supply range is calculated. Finally, IEEE 69 bus system is adopted to test the accuracy and practicality of the proposed algorithm.

  2. 12 CFR 714.6 - Are you required to retain salvage powers over the leased property?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Are you required to retain salvage powers over the leased property? 714.6 Section 714.6 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS LEASING § 714.6 Are you required to retain salvage powers over the leased...

  3. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Science.gov (United States)

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  4. Refractory metal alloys and composites for space power systems

    International Nuclear Information System (INIS)

    Stephens, J.R.; Petrasek, D.W.; Titran, R.H.

    1994-01-01

    Space power requirements for future NASA and other United States missions will range from a few kilowatts to megawatts of electricity. Maximum efficiency is a key goal of any power system in order to minimize weight and size so that the space shuttle may be used a minimum number of times to put the power supply into orbit. Nuclear power has been identified as the primary power source to meet these high levels of electrical demand. One method to achieve maximum efficiency is to operate the power supply, energy conversion system, and related components at relatively high temperatures. NASA Lewis Research Center has undertaken a research program on advanced technology of refractory metal alloys and composites that will provide base line information for space power systems in the 1900's and the 21st century. Basic research on the tensile and creep properties of fibers, matrices, and composites will be discussed

  5. TOKMINA, Toroidal Magnetic Field Minimization for Tokamak Fusion Reactor. TOKMINA-2, Total Power for Tokamak Fusion Reactor

    International Nuclear Information System (INIS)

    Hatch, A.J.

    1975-01-01

    1 - Description of problem or function: TOKMINA finds the minimum magnetic field, Bm, required at the toroidal coil of a Tokamak type fusion reactor when the input is beta(ratio of plasma pressure to magnetic pressure), q(Kruskal-Shafranov plasma stability factor), and y(ratio of plasma radius to vacuum wall radius: rp/rw) and arrays of PT (total thermal power from both d-t and tritium breeding reactions), Pw (wall loading or power flux) and TB (thickness of blanket), following the method of Golovin, et al. TOKMINA2 finds the total power, PT, of such a fusion reactor, given a specified magnetic field, Bm, at the toroidal coil. 2 - Method of solution: TOKMINA: the aspect ratio(a) is minimized, giving a minimum value for Bm. TOKMINA2: a search is made for PT; the value of PT which minimizes Bm to the required value within 50 Gauss is chosen. 3 - Restrictions on the complexity of the problem: Input arrays presently are dimensioned at 20. This restriction can be overcome by changing a dimension card

  6. Minimum dimension of an ITER like Tokamak with a given Q

    Energy Technology Data Exchange (ETDEWEB)

    Johner, J

    2004-07-01

    The minimum dimension of an ITER like tokamak with a given amplification factor Q is calculated for two values of the maximum magnetic field in the superconducting toroidal field coils. For ITERH-98P(y,2) scaling of the energy confinement time, it is shown that for a sufficiently large tokamak, the maximum Q is obtained for the operating point situated both at the maximum density and at the minimum margin with respect to the H-L transition. We have shown that increasing the maximum magnetic field in the toroidal field coils from the present 11.8 T to 16 T would result in a strong reduction of the machine size but has practically no effect on the fusion power. Values obtained for {beta}{sub N} are found to be below 2. Peak fluxes on the divertor plates with an ITER like divertor and a multi-machine expression for the power radiated in the plasma mantle, are below 10 MW/m{sup 2}.

  7. 29 CFR 541.604 - Minimum guarantee plus extras.

    Science.gov (United States)

    2010-07-01

    ... DEFINING AND DELIMITING THE EXEMPTIONS FOR EXECUTIVE, ADMINISTRATIVE, PROFESSIONAL, COMPUTER AND OUTSIDE SALES EMPLOYEES Salary Requirements § 541.604 Minimum guarantee plus extras. (a) An employer may provide... commission on sales. An exempt employee also may receive a percentage of the sales or profits of the employer...

  8. Minimum-link paths among obstacles in the plane

    NARCIS (Netherlands)

    Mitchell, J.S.B.; Rote, G.; Woeginger, G.J.

    1992-01-01

    Given a set of nonintersecting polygonal obstacles in the plane, thelink distance between two pointss andt is the minimum number of edges required to form a polygonal path connectings tot that avoids all obstacles. We present an algorithm that computes the link distance (and a corresponding

  9. Do Minimum Wages Fight Poverty?

    OpenAIRE

    David Neumark; William Wascher

    1997-01-01

    The primary goal of a national minimum wage floor is to raise the incomes of poor or near-poor families with members in the work force. However, estimates of employment effects of minimum wages tell us little about whether minimum wages are can achieve this goal; even if the disemployment effects of minimum wages are modest, minimum wage increases could result in net income losses for poor families. We present evidence on the effects of minimum wages on family incomes from matched March CPS s...

  10. How wing kinematics affect power requirements and aerodynamic force production in a robotic bat wing

    International Nuclear Information System (INIS)

    Bahlman, Joseph W; Swartz, Sharon M; Breuer, Kenneth S

    2014-01-01

    Bats display a wide variety of behaviors that require different amounts of aerodynamic force. To control and modulate aerodynamic force, bats change wing kinematics, which, in turn, may change the power required for wing motion. There are many kinematic mechanisms that bats, and other flapping animals, can use to increase aerodynamic force, e.g. increasing wingbeat frequency or amplitude. However, we do not know if there is a difference in energetic cost between these different kinematic mechanisms. To assess the relationship between mechanical power input and aerodynamic force output across different isolated kinematic parameters, we programmed a robotic bat wing to flap over a range of kinematic parameters and measured aerodynamic force and mechanical power. We systematically varied five kinematic parameters: wingbeat frequency, wingbeat amplitude, stroke plane angle, downstroke ratio, and wing folding. Kinematic values were based on observed values from free flying Cynopterus brachyotis, the species on which the robot was based. We describe how lift, thrust, and power change with increases in each kinematic variable. We compare the power costs associated with generating additional force through the four kinematic mechanisms controlled at the shoulder, and show that all four mechanisms require approximately the same power to generate a given force. This result suggests that no single parameter offers an energetic advantage over the others. Finally, we show that retracting the wing during upstroke reduces power requirements for flapping and increases net lift production, but decreases net thrust production. These results compare well with studies performed on C. brachyotis, offering insight into natural flight kinematics. (paper)

  11. Reactive power interconnection requirements for PV and wind plants : recommendations to NERC.

    Energy Technology Data Exchange (ETDEWEB)

    McDowell, Jason (General Electric, Schenectady, NY); Walling, Reigh (General Electric, Schenectady, NY); Peter, William (SunPower, Richmond, CA); Von Engeln, Edi (NV Energy, Reno, NV); Seymour, Eric (AEI, Fort Collins, CO); Nelson, Robert (Siemens Wind Turbines, Orlando, FL); Casey, Leo (Satcon, Boston, MA); Ellis, Abraham; Barker, Chris. (SunPower, Richmond, CA)

    2012-02-01

    Voltage on the North American bulk system is normally regulated by synchronous generators, which typically are provided with voltage schedules by transmission system operators. In the past, variable generation plants were considered very small relative to conventional generating units, and were characteristically either induction generator (wind) or line-commutated inverters (photovoltaic) that have no inherent voltage regulation capability. However, the growing level of penetration of non-traditional renewable generation - especially wind and solar - has led to the need for renewable generation to contribute more significantly to power system voltage control and reactive power capacity. Modern wind-turbine generators, and increasingly PV inverters as well, have considerable dynamic reactive power capability, which can be further enhanced with other reactive support equipment at the plant level to meet interconnection requirements. This report contains a set of recommendations to the North-America Electricity Reliability Corporation (NERC) as part of Task 1-3 (interconnection requirements) of the Integration of Variable Generation Task Force (IVGTF) work plan. The report discusses reactive capability of different generator technologies, reviews existing reactive power standards, and provides specific recommendations to improve existing interconnection standards.

  12. Implications of Microwave Holography Using Minimum Required Frequency Samples for Weakly- and Strongly-Scattering Indications

    Science.gov (United States)

    Fallahpour, M.; Case, J. T.; Kharkovsky, S.; Zoughi, R.

    2010-01-01

    Microwave imaging techniques, an integral component of nondestructive testing and evaluation (NDTE), have received significant attention in the past decade. These techniques have included the implementation of synthetic aperture focusing (SAF) algorithms for obtaining high spatial resolution images. The next important step in these developments is the implementation of 3-D holographic imaging algorithms. These are well-known wideband imaging technique requiring a swept-frequency (i.e., wideband), which unlike SAF that is a single frequency technique, are not easily performed on a real-time basis. This is due to the fact that a significant number of data points (in the frequency domain) must be obtained within the frequency band of interest. This not only makes for a complex imaging system design, it also significantly increases the image-production time. Consequently in an attempt to reduce the measurement time and system complexity, an investigation was conducted to determine the minimum required number of frequency samples needed to image a specific object while preserving a desired maximum measurement range and range resolution. To this end the 3-D holographic algorithm was modified to use properlyinterpolated frequency data. Measurements of the complex reflection coefficient for several samples were conducted using a swept-frequency approach. Subsequently, holographical images were generated using data containing a relatively large number of frequency samples and were compared with images generated by the reduced data set data. Quantitative metrics such as average, contrast, and signal-to-noise ratio were used to evaluate the quality of images generated using reduced data sets. Furthermore, this approach was applied to both weakly- and strongly-scattering indications. This paper presents the methods used and the results of this investigation.

  13. Development of safety-related regulatory requirements for nuclear power in developing countries. Key issue paper no. 4

    International Nuclear Information System (INIS)

    Han, K.I.

    2000-01-01

    In implementing a national nuclear power program, balanced regulatory requirements are necessary to ensure nuclear safety and cost competitive nuclear power, and to help gain public acceptance. However, this is difficult due to the technology-intensive nature of the nuclear regulatory requirements, the need to reflect evolving technology and the need for cooperation among multidisciplinary technical groups. This paper suggests approaches to development of balanced nuclear regulatory requirements in developing countries related to nuclear power plant safety, radiation protection and radioactive waste management along with key technical regulatory issues. It does not deal with economic or market regulation of electric utilities using nuclear power. It suggests that national regulatory requirements be developed using IAEA safety recommendations as guidelines and safety requirements of the supplier country as a main reference after careful planning, manpower buildup and thorough study of international and supplier country's regulations. Regulation making is not recommended before experienced manpower has been accumulated. With an option that the supplier country's regulations may be used in the interim, the lack of complete national regulatory requirements should not deter introduction of nuclear power in developing countries. (author)

  14. Latitude and Power Characteristics of Solar Activity at the End of the Maunder Minimum

    Science.gov (United States)

    Ivanov, V. G.; Miletsky, E. V.

    2017-12-01

    Two important sources of information about sunspots in the Maunder minimum are the Spörer catalog (Spörer, 1889) and observations of the Paris observatory (Ribes and Nesme-Ribes, 1993), which cover in total the last quarter of the 17th and the first two decades of the 18th century. These data, in particular, contain information about sunspot latitudes. As we showed in (Ivanov et al., 2011; Ivanov and Miletsky, 2016), dispersions of sunspot latitude distributions are tightly related to sunspot indices, and we can estimate the level of solar activity in the past using a method which is not based on direct calculation of sunspots and weakly affected by loss of observational data. The latitude distributions of sunspots in the time of transition from the Maunder minimum to the regular regime of solar activity proved to be wide enough. It gives evidences in favor of, first, not very low cycle no.-3 (1712-1723) with the Wolf number in maximum W = 100 ± 50, and, second, nonzero activity in the maximum of cycle no.-4 (1700-1711) W = 60 ± 45. Therefore, the latitude distributions in the end of the Maunder minimum are in better agreement with the traditional Wolf numbers and new revisited indices of activity SN and GN (Clette et al., 2014; Svalgaard and Schatten, 2016) than with the GSN (Hoyt and Schatten, 1998); the latter provide much lower level of activity in this epoch.

  15. Policy planning for nuclear power: An overview of the main issues and requirements

    International Nuclear Information System (INIS)

    1993-08-01

    This special report, Policy Planning for Nuclear Power: An Overview of the Main Issues and Requirements, has been prepared in response to the express request of a number of IAEA Member States for a document to assist makers in developing countries on the introduction of nuclear power. The report contains information on the political, governmental, economic, financial and technical issues and requirements associated with planning and implementing a safe, economic and reliable nuclear power programme. It highlights the main areas in which policies must be developed and decisions taken, as well as the role and responsibilities of government, the plant owner and national industry. Also presented are the main criteria to assist policy planners in defining options and strategies which can achieve a balance among such objectives as cost effective and efficient electricity production, realistic and acceptable financing arrangements, national development requirements, safety and environmental protection. Further information and details on the technical and other issues presented in this report are given in the list of related IAEA publications and documents at the end of this report

  16. Planetary tides during the Maunder sunspot minimum

    International Nuclear Information System (INIS)

    Smythe, C.M.; Eddy, J.A.

    1977-01-01

    Sun-centered planetary conjunctions and tidal potentials are here constructed for the AD1645 to 1715 period of sunspot absence, referred to as the 'Maunder Minimum'. These are found to be effectively indistinguishable from patterns of conjunctions and power spectra of tidal potential in the present era of a well established 11 year sunspot cycle. This places a new and difficult restraint on any tidal theory of sunspot formation. Problems arise in any direct gravitational theory due to the apparently insufficient forces and tidal heights involved. Proponents of the tidal hypothesis usually revert to trigger mechanisms, which are difficult to criticise or test by observation. Any tidal theory rests on the evidence of continued sunspot periodicity and the substantiation of a prolonged period of solar anomaly in the historical past. The 'Maunder Minimum' was the most drastic change in the behaviour of solar activity in the last 300 years; sunspots virtually disappeared for a 70 year period and the 11 year cycle was probably absent. During that time, however, the nine planets were all in their orbits, and planetary conjunctions and tidal potentials were indistinguishable from those of the present era, in which the 11 year cycle is well established. This provides good evidence against the tidal theory. The pattern of planetary tidal forces during the Maunder Minimum was reconstructed to investigate the possibility that the multiple planet forces somehow fortuitously cancelled at the time, that is that the positions of the slower moving planets in the 17th and early 18th centuries were such that conjunctions and tidal potentials were at the time reduced in number and force. There was no striking dissimilarity between the time of the Maunder Minimum and any period investigated. The failure of planetary conjunction patterns to reflect the drastic drop in sunspots during the Maunder Minimum casts doubt on the tidal theory of solar activity, but a more quantitative test

  17. Power requirements of biogas upgrading by water scrubbing and biomethane compression: Comparative analysis of various plant configurations

    International Nuclear Information System (INIS)

    Budzianowski, Wojciech M.; Wylock, Christophe E.; Marciniak, Przemysław A.

    2017-01-01

    Highlights: • Insights into power requirements of biomethane production from biogas are provided. • Process model is constructed, validated and simulated. • High-pressure and low-pressure plant operation in different configurations is compared. - Abstract: Biogas upgrading by water scrubbing followed by biomethane compression is an environmentally benign process. It may be achieved using various plant configurations characterised by various power requirements with associated effects on biomethane sustainability. Therefore, the current study has been undertaken to systematically investigate the power requirements of a range of water scrubbing options. Two groups of water scrubbing are analysed: (1) high pressure water scrubbing (HPWS) and (2) near-atmospheric pressure water scrubbing (NAPWS). A water scrubbing plant model is constructed, experimentally validated and simulated for seven upgrading plant configurations. Simulation results show that the power requirement of biogas upgrading in HPWS plants is mainly associated with biogas compression. In contrast, in NAPWS plants the main power is required for water pumping. In both plants the compression of the biomethane from atmosphereic pressure to 20 MPa also contributes remarkably. It is observed that the lowest specific power requirement can be obtained for a NAPWS plant without water regeneration (0.24 kW h/Nm"3 raw biogas) but this plant requires cheap water supply, e.g. outlet water from a sewage treatment plant or river. The second is HPWS without flash (0.29 kW h/Nm"3 raw biogas). All other HPWS with flash and NAPWS with water regeneration plants have specific power requirements between 0.30 and 0.33 kW h/Nm"3 raw biogas. Biogas compression without upgrading requires about 0.29 kW h/Nm"3 raw biogas. The thermodynamic efficiency of biogas upgrading is between 2.2% and 9.8% depending on the plant configuration while biomethane compression efficiency is higher, about 55%. This result implies that the

  18. 29 CFR 520.403 - What information is required when applying for authority to pay less than the minimum wage?

    Science.gov (United States)

    2010-07-01

    ... pay less than the minimum wage? 520.403 Section 520.403 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS EMPLOYMENT UNDER SPECIAL CERTIFICATE OF... than the minimum wage? (a) A separate application must be made for each plant or establishment...

  19. Minimum forest cover required for sustainable water flow regulation of a watershed: a case study in Jambi Province, Indonesia

    Directory of Open Access Journals (Sweden)

    S. Tarigan

    2018-01-01

    Full Text Available In many tropical regions, the rapid expansion of monoculture plantations has led to a sharp decline in forest cover, potentially degrading the ability of watersheds to regulate water flow. Therefore, regional planners need to determine the minimum proportion of forest cover that is required to support adequate ecosystem services in these watersheds. However, to date, there has been little research on this issue, particularly in tropical areas where monoculture plantations are expanding at an alarming rate. Therefore, in this study, we investigated the influence of forest cover and oil palm (Elaeis guineensis and rubber (Hevea brasiliensis plantations on the partitioning of rainfall into direct runoff and subsurface flow in a humid, tropical watershed in Jambi Province, Indonesia. To do this, we simulated streamflow with a calibrated Soil and Water Assessment Tool (SWAT model and observed several watersheds to derive the direct runoff coefficient (C and baseflow index (BFI. The model had a strong performance, with Nash–Sutcliffe efficiency values of 0.80–0.88 (calibration and 0.80–0.85 (validation and percent bias values of −2.9–1.2 (calibration and 7.0–11.9 (validation. We found that the percentage of forest cover in a watershed was significantly negatively correlated with C and significantly positively correlated with BFI, whereas the rubber and oil palm plantation cover showed the opposite pattern. Our findings also suggested that at least 30 % of the forest cover was required in the study area for sustainable ecosystem services. This study provides new adjusted crop parameter values for monoculture plantations, particularly those that control surface runoff and baseflow processes, and it also describes the quantitative association between forest cover and flow indicators in a watershed, which will help regional planners in determining the minimum proportion of forest and the maximum proportion of plantation to ensure that a

  20. Differential rotation of the Sun and the Maunder minimum of solar activity

    International Nuclear Information System (INIS)

    Ikhsanov, R.N.; Vitinskij, Yu.I.

    1980-01-01

    Nature of differential rotation of the Sun is discussed. Investigation of long term changes in differential rotation separately for two phase of 11 year cycle of the Sun activity is carried out. Data on heliographic coordinates for every day of all groups of the Sun spots for the years preceding the epoch of the minimum of the 11 year cycle and the Sun groups for the years of maximum from ''Greenwich Photoheliographic Results'' for 1875-1954 are used as initial material. It is shown that differential rotation of the Sun changes in time from one 11 year cycle of the Sun activity to another. This change is connected with the power of 11 year cycle. During the maximum phase of 11 year cycle differentiality of the rotation increases in the cycles where the cycle maximum is higher. Before the minimum of 11 year cycle rotation differentiability is lower in the cycles for which activity maximum is higher in the next 11 year cycle. Equatorial rate of the Sun rotation increases with the decrease in the cycle power when the maximum Wolf number is less than 110. The mentioned regularities took place both during Maunder minimum and before its beginning [ru

  1. Seasonal optimal mix of wind and solar power in a future, highly renewable Europe

    Energy Technology Data Exchange (ETDEWEB)

    Heide, Dominik [Frankfurt Institute for Advanced Studies (FIAS) and Frankfurt International Graduate School for Science, Johann Wolfgang Goethe Universitaet, Ruth-Moufang-Strasse 1, D-60438 Frankfurt am Main (Germany); von Bremen, Lueder [ForWind - Center for Wind Energy Research, University of Oldenburg, Marie-Curie-Str. 1, D-26129 Oldenburg (Germany); Greiner, Martin [Corporate Research and Technology, Siemens AG, D-81730 Muenchen (Germany); Aarhus School of Engineering and Institute of Mathematical Sciences, Aarhus University, Ny Munkegade 118, 8000 Aarhus C (Denmark); Hoffmann, Clemens [Corporate Research and Technology, Siemens AG, D-81730 Muenchen (Germany); Speckmann, Markus; Bofinger, Stefan [Fraunhofer Institut fuer Windenergie und Energiesystemtechnik (IWES), Koenigstor 59, D-34119 Kassel (Germany)

    2010-11-15

    The renewable power generation aggregated across Europe exhibits strong seasonal behaviors. Wind power generation is much stronger in winter than in summer. The opposite is true for solar power generation. In a future Europe with a very high share of renewable power generation those two opposite behaviors are able to counterbalance each other to a certain extent to follow the seasonal load curve. The best point of counterbalancing represents the seasonal optimal mix between wind and solar power generation. It leads to a pronounced minimum in required stored energy. For a 100% renewable Europe the seasonal optimal mix becomes 55% wind and 45% solar power generation. For less than 100% renewable scenarios the fraction of wind power generation increases and that of solar power generation decreases. (author)

  2. 10 CFR 503.8 - No alternate power supply-general requirement for certain exemptions for new powerplants.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false No alternate power supply-general requirement for certain exemptions for new powerplants. 503.8 Section 503.8 Energy DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS NEW FACILITIES General Requirements for Exemptions § 503.8 No alternate power supply—general...

  3. On the Minimum Cable Tensions for the Cable-Based Parallel Robots

    Directory of Open Access Journals (Sweden)

    Peng Liu

    2014-01-01

    Full Text Available This paper investigates the minimum cable tension distributions in the workspace for cable-based parallel robots to find out more information on the stability. First, the kinematic model of a cable-based parallel robot is derived based on the wrench matrix. Then, a noniterative polynomial-based optimization algorithm with the proper optimal objective function is presented based on the convex optimization theory, in which the minimum cable tension at any pose is determined. Additionally, three performance indices are proposed to show the distributions of the minimum cable tensions in a specified region of the workspace. An important thing is that the three performance indices can be used to evaluate the stability of the cable-based parallel robots. Furthermore, a new workspace, the Specified Minimum Cable Tension Workspace (SMCTW, is introduced, within which all the minimum tensions exceed a specified value, therefore meeting the specified stability requirement. Finally, a camera robot parallel driven by four cables for aerial panoramic photographing is selected to illustrate the distributions of the minimum cable tensions in the workspace and the relationship between the three performance indices and the stability.

  4. High power RF systems for the BNL ERL project

    Energy Technology Data Exchange (ETDEWEB)

    Zaltsman, A.; Lambiase, R.

    2011-03-28

    The Energy Recovery Linac (ERL) project, now under construction at Brookhaven National Laboratory, requires two high power RF systems. The first RF system is for the 703.75 MHz superconducting electron gun. The RF power from this system is used to drive nearly half an Ampere of beam current to 2 MeV. There is no provision to recover any of this energy so the minimum amplifier power is 1 MW. It consists of 1 MW CW klystron, transmitter and power supplies, 1 MW circulator, 1 MW dummy load and a two-way power splitter. The second RF system is for the 703.75 MHz superconducting cavity. The system accelerates the beam to 54.7 MeV and recovers this energy. It will provide up to 50 kW of CW RF power to the cavity. It consists of 50 kW transmitter, circulator, and dummy load. This paper describes the two high power RF systems and presents the test data for both.

  5. Analysis of the Possibility of Required Resources Estimation for Nuclear Power Plant Decommissioning Applying BIM

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Insu [Korea Institute of construction Technology, Goyang (Korea, Republic of); Kim, Woojung [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    Estimation of decommissioning cost, decommissioning strategy, and decommissioning quantity at the time when entering into any decommissioning plans are some elements whose inputs are mandatory for nuclear power plant decommissioning. Ways to estimate decommissioning of required resources in the past have imposed great uncertainty since they analyze required resources at the construction stage, analyzing and consulting decommissioning required resources of overseas nuclear power plants. This study aims at analyzing whether required resources for decommissioning nuclear power plants can be estimated, applying BIM. To achieve this goal, this study analyzed the status quo of BIM such as definition, characteristics, and areas applied, and made use of them when drawing out study results by examining types and features of the tools realizing BIM. In order to review how BIM could be used for decommissioning nuclear power plants, the definition, characteristics and applied areas of BIM were discussed. BIM designs objects of the structures (walls, slabs, pillars, stairs, windows and doors, etc.) by 3D technology and endows attribute (function, structure and usage) information for each object, thereby providing visualized information of structures for participants in construction projects. Major characteristics of BIM attribute information are as follows: - Geometry: The information of objects is represented by measurable geometric information - Extensible object attributes: Objects include pre-defined attributes, and allow extension of other attributes. Any model that includes these attributes forms relationships with other various attributes in order to perform analysis and simulation. - All information including the attributes are integrated to ensure continuity, accuracy and accessibility, and all information used during the life cycle of structures are supported. This means that when information of required resources is added as another attributes other than geometric

  6. Integrated approach for power quality requirements at the point of connection

    NARCIS (Netherlands)

    Cobben, J.F.G.; Bhattacharyya, S.; Myrzik, J.M.A.; Kling, W.L.

    2007-01-01

    Given the nature of electricity, every party connected to the power system influences voltage quality, which means that every party also should meet requirements. In this field, a sound coordination among technical standards (system-related, installation-related and product-related) is of paramount

  7. Quality assurance requirements for the operation of Swedish nuclear power plants

    International Nuclear Information System (INIS)

    1983-09-01

    An adaption of NRC's 10 CFR 50, Appendis B (Quality Assurance Criteria for Nuclear Power and Fuel Reprocessing Plants) to Swedish conditions is presented. No references are given to regulations standards etc that influence the requirements and their adaption to local conditions. (Aa)

  8. Generalized Power Domination

    OpenAIRE

    Omerzel, Aleš

    2014-01-01

    The power domination problem is an optimization problem that has emerged together with the development of the power networks. It is important to control the voltage and current in all the nodes and links in a power network. Measuring devices are expensive, which is why there is a tendency to place a minimum number of devices in a power network so that the network remains fully supervised. The k-power domination is a generalization of the power domination. The thesis represents the rules of th...

  9. Performance evaluation of power transmission coils for powering endoscopic wireless capsules.

    Science.gov (United States)

    Basar, Md Rubel; Ahmad, Mohd Yazed; Cho, Jongman; Ibrahim, Fatimah

    2015-01-01

    This paper presents an analysis of H-field generated by a simple solenoid, pair of solenoids, pair of double-layer solenoids, segmented-solenoid, and Helmholtz power transmission coils (PTCs) to power an endoscopic wireless capsule (WC). The H-fields were computed using finite element analysis based on partial differential equations. Three parameters were considered in the analysis: i) the maximum level of H-field (Hmax) to which the patient's body would be exposed, ii) the minimum level of H-field (Hmin) effective for power transmission, and iii) uniformity of H-field. We validated our analysis by comparing the computed data with data measured from a fabricated Helmholtz PTC. This analysis disclosed that at the same excitation power, all the PTCs are able to transfer same amount of minimum usable power since they generated almost equal value of Hmin. The level of electromagnetic exposure and power transfer stability across all the PTCs would vary significantly which is mainly due to the different level of Hmax and H-field uniformity. The segmented solenoid PTC would cause the lowest exposure and this PTC can transfer the maximum amount of power. The Helmholtz PTC would be able to transfer the most stable power with a moderate level of exposure.

  10. Risk control and the minimum significant risk

    International Nuclear Information System (INIS)

    Seiler, F.A.; Alvarez, J.L.

    1996-01-01

    Risk management implies that the risk manager can, by his actions, exercise at least a modicum of control over the risk in question. In the terminology of control theory, a management action is a control signal imposed as feedback on the system to bring about a desired change in the state of the system. In the terminology of risk management, an action is taken to bring a predicted risk to lower values. Even if it is assumed that the management action taken is 100% effective and that the projected risk reduction is infinitely well known, there is a lower limit to the desired effects that can be achieved. It is based on the fact that all risks, such as the incidence of cancer, exhibit a degree of variability due to a number of extraneous factors such as age at exposure, sex, location, and some lifestyle parameters such as smoking or the consumption of alcohol. If the control signal is much smaller than the variability of the risk, the signal is lost in the noise and control is lost. This defines a minimum controllable risk based on the variability of the risk over the population considered. This quantity is the counterpart of the minimum significant risk which is defined by the uncertainties of the risk model. Both the minimum controllable risk and the minimum significant risk are evaluated for radiation carcinogenesis and are shown to be of the same order of magnitude. For a realistic management action, the assumptions of perfectly effective action and perfect model prediction made above have to be dropped, resulting in an effective minimum controllable risk which is determined by both risk limits. Any action below that effective limit is futile, but it is also unethical due to the ethical requirement of doing more good than harm. Finally, some implications of the effective minimum controllable risk on the use of the ALARA principle and on the evaluation of remedial action goals are presented

  11. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Russian Edition); Bezopasnost' atomnykh ehlektrostantsij: proektirovanie. Konkretnye trebovaniya bezopasnosti

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-04-15

    This publication is a revision of Safety Requirements No. NS-R-1, Safety of Nuclear Power Plants: Design. It establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in the design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  12. Active Power Flow Optimization of Industrial Power Supply with Regard to the Transmission Line Conductor Heating

    Directory of Open Access Journals (Sweden)

    Leyzgold D.Yu.

    2015-04-01

    Full Text Available This article studies the problem of the transmission line conductor heating effect on the active power flows optimization in the local segment of industrial power supply. The purpose is to determine the optimal generation rating of the distributed power sources, in which the power flow values will correspond to the minimum active power losses in the power supply. The timeliness is the need to define the most appropriate rated power values of distributed sources which will be connected to current industrial power supply. Basing on the model of active power flow optimization, authors formulate the description of the nonlinear transportation problem considering the active power losses depending on the transmission line conductor heating. Authors proposed a new approach to the heating model parameters definition based on allowable current loads and nominal parameters of conductors as part of the optimization problem. Analysis of study results showed that, despite the relatively small active power losses reduction to the tune 0,45% due to accounting of the conductors heating effect for the present configuration of power supply, there are significant fluctuations in the required generation rating in nodes of the network to 9,32% within seasonal changes in the outer air temperature. This fact should be taken into account when selecting the optimum power of distributed generation systems, as exemplified by an arbitrary network configuration.

  13. A superconducting isochronous cyclotron stack as a driver for a thorium-cycle power reactor

    International Nuclear Information System (INIS)

    Kim, G.; May, D.; McIntyre, P.; Sattarov, A.

    2001-01-01

    Designs for thorium-cycle power reactors require a proton driver capable of 1 GeV energy and 10 MW total power. For this purpose we have prepared a preliminary design for the magnetic structure for a stack of 5 super-conducting isochronous cyclotrons, each delivering 2 MW beam power. By achieving the required power with multiple independent apertures rather than pushing beyond currently achieved limits, we hope to arrive at a design that is cost-minimum and reliable. Each sector magnet consists of a flux-coupled stack of cold-iron inserts supported within a single warm-iron, in a fashion inspired by the new Riken heavy-ion cyclotron. We have developed a preliminary field design in which in-plane fields are cancelled in all 5 apertures and the field-map is appropriate for the focusing optics of the sector cyclotron

  14. General requirements for concrete containment structures for CANDU nuclear power plants

    International Nuclear Information System (INIS)

    1993-07-01

    This standard provides the general requirements used in the design, construction, testing, and commissioning of concrete containment structures for CANDU nuclear power plants designated as class containment and is directed to the owners, designers, manufacturers, fabricators, and constructors of the concrete components and parts

  15. Mathematical game type optimization of powerful fast reactors

    International Nuclear Information System (INIS)

    Pavelesku, M.; Dumitresku, Kh.; Adam, S.

    1975-01-01

    To obtain maximum speed of putting into operation fast breeders it is recommended on the initial stage of putting into operation these reactors to apply lower power which needs less fission materials. That is why there is an attempt to find a configuration of a high-power reactor providing maximum power for minimum mass of fission material. This problem has a structure of the mathematical game with two partners of non-zero-order total and is solved by means of specific aids of theory of games. Optimal distribution of fission and breeding materials in a multizone reactor first is determined by solution of competitive game and then, on its base, by solution of the cooperation game. The second problem the solution for which is searched is developed from remark on the fact that a reactor with minimum coefficient of flux heterogenity has a configuration different from the reactor with power coefficient heterogenity. Maximum burn-up of fuel needs minimum heterogenity of the flux coefficient and the highest power level needs minimum coefficient of power heterogenity. That is why it is possible to put a problem of finding of the reactor configuration having both coefficients with minimum value. This problem has a structure of a mathematical game with two partners of non-zero-order total and is solved analogously giving optimal distribution of fuel from the new point of view. In the report is shown that both these solutions are independent which is a result of the aim put in the problem of optimization. (author)

  16. Rising above the Minimum Wage.

    Science.gov (United States)

    Even, William; Macpherson, David

    An in-depth analysis was made of how quickly most people move up the wage scale from minimum wage, what factors influence their progress, and how minimum wage increases affect wage growth above the minimum. Very few workers remain at the minimum wage over the long run, according to this study of data drawn from the 1977-78 May Current Population…

  17. Computerized control and management at the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Mitosinka, J.; Korec, J.

    1992-01-01

    The proposed automation of the nuclear power plant control system includes a division of the control system into three hierarchic levels, supplemented with an additional level. These comprise the automated system of control of technological processes, the all-plant control of the power-generating process, the control of backup activities and of technical and economic activities, and top managerial control. The efficiency of the nuclear power plant operation, i.e. attainment of the maximum electricity output with minimum costs while securing the required safety, is the principal criterion in the design of the data model. Listed are tasks that would lend themselves to automation within the automated system of nuclear power plant control, and the basic scheme of their automation as follows from an analysis performed at the Temelin nuclear power plant. (Z.S). 2 figs., 2 refs

  18. 78 FR 69543 - Record Requirements in the Mechanical Power Presses Standard

    Science.gov (United States)

    2013-11-20

    ... program). In such cases, OSHA would treat the weekly inspection as part of the periodic inspection.... OSHA-2013-0010] RIN 1218-AC80 Record Requirements in the Mechanical Power Presses Standard AGENCY: Occupational Safety and Health Administration (OSHA), Labor. ACTION: Direct final rule; request for comments...

  19. 78 FR 69606 - Record Requirements in the Mechanical Power Presses Standard

    Science.gov (United States)

    2013-11-20

    ... the inspection program). In such cases, OSHA would treat the weekly inspection as part of the periodic.... OSHA-2013-0010] RIN 1218-AC80 Record Requirements in the Mechanical Power Presses Standard AGENCY: Occupational Safety and Health Administration (OSHA), Labor. ACTION: Proposed rule; request for comments...

  20. Design for minimum energy in interstellar communication

    Science.gov (United States)

    Messerschmitt, David G.

    2015-02-01

    Microwave digital communication at interstellar distances is the foundation of extraterrestrial civilization (SETI and METI) communication of information-bearing signals. Large distances demand large transmitted power and/or large antennas, while the propagation is transparent over a wide bandwidth. Recognizing a fundamental tradeoff, reduced energy delivered to the receiver at the expense of wide bandwidth (the opposite of terrestrial objectives) is advantageous. Wide bandwidth also results in simpler design and implementation, allowing circumvention of dispersion and scattering arising in the interstellar medium and motion effects and obviating any related processing. The minimum energy delivered to the receiver per bit of information is determined by cosmic microwave background alone. By mapping a single bit onto a carrier burst, the Morse code invented for the telegraph in 1836 comes closer to this minimum energy than approaches used in modern terrestrial radio. Rather than the terrestrial approach of adding phases and amplitudes increases information capacity while minimizing bandwidth, adding multiple time-frequency locations for carrier bursts increases capacity while minimizing energy per information bit. The resulting location code is simple and yet can approach the minimum energy as bandwidth is expanded. It is consistent with easy discovery, since carrier bursts are energetic and straightforward modifications to post-detection pattern recognition can identify burst patterns. Time and frequency coherence constraints leading to simple signal discovery are addressed, and observations of the interstellar medium by transmitter and receiver constrain the burst parameters and limit the search scope.

  1. Modular He-cooled divertor for power plant application

    International Nuclear Information System (INIS)

    Diegele, Eberhard; Kruessmann, R.; Malang, S.; Norajitra, P.; Rizzi, G.

    2003-01-01

    Gas cooled divertor concepts are regarded as a suitable option for fusion power plants because of an increased thermal efficiency for power conversion systems and the use of a coolant compatible with all blanket systems. A modular helium cooled divertor concept is proposed with an improved heat transfer. The concept employs small tiles made of tungsten and brazed to a finger-like structure made of Mo-alloy (TZM). Design goal was a heat flux of at least 15 MW/m 2 and a minimum temperature of the structure of 600 deg.C. The divertor has to survive a number of cycles (100-1000) between operating temperature and room temperature even for the steady state operation assumed. Thermo-hydraulic design requirements for the concepts include to keep the pumping power below 10% of the thermal power to the divertor plates, and simultaneously achieving a heat transfer coefficient in excess of 60 kW/m 2 K. Inelastic stress analysis indicates that design allowable stress limits on primary and secondary (thermal) stresses as required by the ITER structural design criteria are met even under conservative assumptions. Finally, critical issues for future development are addressed

  2. Flood control design requirements and flood evaluation methods of inland nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Ailing; Wang Ping; Zhu Jingxing

    2011-01-01

    Effect of flooding is one of the key safety factors and environmental factors in inland nuclear power plant sitting. Up to now, the rule of law and standard systems are established for the selection of nuclear power plant location and flood control requirements in China. In this paper flood control standards of China and other countries are introduced. Several inland nuclear power plants are taken as examples to thoroughly discuss the related flood evaluation methods. The suggestions are also put forward in the paper. (authors)

  3. Wireless electricity (Power) transmission using solar based power satellite technology

    International Nuclear Information System (INIS)

    Maqsood, M; Nasir, M Nauman

    2013-01-01

    In the near future due to extensive use of energy, limited supply of resources and the pollution in environment from present resources e.g. (wood, coal, fossil fuel) etc, alternative sources of energy and new ways to generate energy which are efficient, cost effective and produce minimum losses are of great concern. Wireless electricity (Power) transmission (WET) has become a focal point as research point of view and nowadays lies at top 10 future hot burning technologies that are under research these days. In this paper, we present the concept of transmitting power wirelessly to reduce transmission and distribution losses. The wired distribution losses are 70 – 75% efficient. We cannot imagine the world without electric power which is efficient, cost effective and produce minimum losses is of great concern. This paper tells us the benefits of using WET technology specially by using Solar based Power satellites (SBPS) and also focuses that how we make electric system cost effective, optimized and well organized. Moreover, attempts are made to highlight future issues so as to index some emerging solutions.

  4. 25 CFR 547.10 - What are the minimum standards for Class II gaming system critical events?

    Science.gov (United States)

    2010-04-01

    ...: Event Definition and action to be taken (i) Player interface power off during play This condition is reported by the affected component(s) to indicate power has been lost during game play. (ii) Player... INTERIOR HUMAN SERVICES MINIMUM TECHNICAL STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II...

  5. A study of the minimum number of slices required for quantification of pulmonary emphysema by computed tomography

    International Nuclear Information System (INIS)

    Hitsuda, Yutaka; Igishi, Tadashi; Kawasaki, Yuji

    2000-01-01

    We attempted to determine the minimum number of slices required for quantification of overall emphysema by computed tomography (CT). Forty-nine patients underwent CT scanning with a 15-mm slice interval, and 13 to 18 slices per patient were obtained. The percentage of low attenuation area (LAA%) per slice was measured with a method that we reported on previously, utilizing a CT program and NIH image. The average LAA% values for 1, 2, 3, and 6 slices evenly spaced through the lungs [LAA% (1), LAA% (2), LAA% (3), and LAA% (6)] were compared with those for all slices [LAA% (All)]. The correlation coefficients for LAA% (1), LAA% (2), LAA% (3), and LAA% (6) with LAA% (All) were 0.961, 0.981, 0.993, and 0.997, respectively. Mean differences ±SD were -3.20±4.21%, -2.32±3.00, -0.20±1.84, and -0.16±1.26, respectively. From these results, we concluded that overall emphysema can be quantified by using at least three slices: one each of the upper, middle, and lower lung. (author)

  6. EPPRD: An Efficient Privacy-Preserving Power Requirement and Distribution Aggregation Scheme for a Smart Grid.

    Science.gov (United States)

    Zhang, Lei; Zhang, Jing

    2017-08-07

    A Smart Grid (SG) facilitates bidirectional demand-response communication between individual users and power providers with high computation and communication performance but also brings about the risk of leaking users' private information. Therefore, improving the individual power requirement and distribution efficiency to ensure communication reliability while preserving user privacy is a new challenge for SG. Based on this issue, we propose an efficient and privacy-preserving power requirement and distribution aggregation scheme (EPPRD) based on a hierarchical communication architecture. In the proposed scheme, an efficient encryption and authentication mechanism is proposed for better fit to each individual demand-response situation. Through extensive analysis and experiment, we demonstrate how the EPPRD resists various security threats and preserves user privacy while satisfying the individual requirement in a semi-honest model; it involves less communication overhead and computation time than the existing competing schemes.

  7. Output power analyses for the thermodynamic cycles of thermal power plants

    International Nuclear Information System (INIS)

    Sun Chen; Cheng Xue-Tao; Liang Xin-Gang

    2014-01-01

    Thermal power plant is one of the important thermodynamic devices, which is very common in all kinds of power generation systems. In this paper, we use a new concept, entransy loss, as well as exergy destruction, to analyze the single reheating Rankine cycle unit and the single stage steam extraction regenerative Rankine cycle unit in power plants. This is the first time that the concept of entransy loss is applied to the analysis of the power plant Rankine cycles with reheating and steam extraction regeneration. In order to obtain the maximum output power, the operating conditions under variant vapor mass flow rates are optimized numerically, as well as the combustion temperatures and the off-design flow rates of the flue gas. The relationship between the output power and the exergy destruction rate and that between the output power and the entransy loss rate are discussed. It is found that both the minimum exergy destruction rate and the maximum entransy loss rate lead to the maximum output power when the combustion temperature and heat capacity flow rate of the flue gas are prescribed. Unlike the minimum exergy destruction rate, the maximum entransy loss rate is related to the maximum output power when the highest temperature and heat capacity flow rate of the flue gas are not prescribed. (general)

  8. Prediction of requirements on labor force in the fuel and power generation sector

    International Nuclear Information System (INIS)

    Kaveckova, R.

    1990-01-01

    One of the aspects of socio-economic assessment of development is quantification of the expected requirements on the number of personnel. Predictions are discussed for the period before the year 2005 for solid fuel mining and treatment, gas production and bitumen mining, power and heat generation and also for the production of electricity and heat by nuclear power plants. They are based on an analysis of past development and the present state, on presumed implementation of various concept variants, on the type structure of nuclear power plants, on the rules of the electric power supply system, and also on foreign materials. It is expected that in 2005, nuclear power will employ 15,654 personnel. (M.D.). 4 tabs., 16 refs

  9. Control system and method for a power delivery system having a continuously variable ratio transmission

    Science.gov (United States)

    Frank, Andrew A.

    1984-01-01

    A control system and method for a power delivery system, such as in an automotive vehicle, having an engine coupled to a continuously variable ratio transmission (CVT). Totally independent control of engine and transmission enable the engine to precisely follow a desired operating characteristic, such as the ideal operating line for minimum fuel consumption. CVT ratio is controlled as a function of commanded power or torque and measured load, while engine fuel requirements (e.g., throttle position) are strictly a function of measured engine speed. Fuel requirements are therefore precisely adjusted in accordance with the ideal characteristic for any load placed on the engine.

  10. Development of a standard for calculation and measurement of the moderator temperature coefficient of reactivity in water-moderated power reactors

    International Nuclear Information System (INIS)

    Mosteller, R.D.; Hall, R.A.; Lancaster, D.B.; Young, E.H.; Gavin, P.H.; Robertson, S.T.

    1998-01-01

    The contents of ANS 19.11, the standard for ''Calculation and Measurement of the Moderator Temperature Coefficient of Reactivity in Water-Moderated Power Reactors,'' are described. The standard addresses the calculation of the moderator temperature coefficient (MTC) both at standby conditions and at power. In addition, it describes several methods for the measurement of the at-power MTC and assesses their relative advantages and disadvantages. Finally, it specifies a minimum set of documentation requirements for compliance with the standard

  11. The Power of Neuroimaging Biomarkers for Screening Frontotemporal Dementia

    Science.gov (United States)

    McMillan, Corey T.; Avants, Brian B.; Cook, Philip; Ungar, Lyle; Trojanowski, John Q.; Grossman, Murray

    2014-01-01

    Frontotemporal dementia (FTD) is a clinically and pathologically heterogeneous neurodegenerative disease that can result from either frontotemporal lobar degeneration (FTLD) or Alzheimer’s disease (AD) pathology. It is critical to establish statistically powerful biomarkers that can achieve substantial cost-savings and increase feasibility of clinical trials. We assessed three broad categories of neuroimaging methods to screen underlying FTLD and AD pathology in a clinical FTD series: global measures (e.g., ventricular volume), anatomical volumes of interest (VOIs) (e.g., hippocampus) using a standard atlas, and data-driven VOIs using Eigenanatomy. We evaluated clinical FTD patients (N=93) with cerebrospinal fluid, gray matter (GM) MRI, and diffusion tensor imaging (DTI) to assess whether they had underlying FTLD or AD pathology. Linear regression was performed to identify the optimal VOIs for each method in a training dataset and then we evaluated classification sensitivity and specificity in an independent test cohort. Power was evaluated by calculating minimum sample sizes (mSS) required in the test classification analyses for each model. The data-driven VOI analysis using a multimodal combination of GM MRI and DTI achieved the greatest classification accuracy (89% SENSITIVE; 89% SPECIFIC) and required a lower minimum sample size (N=26) relative to anatomical VOI and global measures. We conclude that a data-driven VOI approach employing Eigenanatomy provides more accurate classification, benefits from increased statistical power in unseen datasets, and therefore provides a robust method for screening underlying pathology in FTD patients for entry into clinical trials. PMID:24687814

  12. Research on Simulation Requirements and Business Architecture of Automated Demand Response in Power Sales Side Market Liberalization

    Science.gov (United States)

    Liu, Yiqun; Zhou, Pengcheng; Zeng, Ming; Chen, Songsong

    2018-01-01

    With the gradual reform of the electricity market, the power sale side liberalization has become the focus of attention as the key task of reform. The open power market provides a good environment for DR (Demand Response). It is of great significance to research the simulation requirements and business architecture of ADR (Automatic Demand Response) in power sale side market liberalization. Firstly, this paper analyzes the simulation requirements of ADR. Secondly, it analyzes the influence factors that the business development of ADR from five aspects after power sale side market liberalization. Finally, Based on ADR technology support system, the business architecture of ADR after power sale side market liberalization is constructed.

  13. The Risk Management of Minimum Return Guarantees

    Directory of Open Access Journals (Sweden)

    Antje Mahayni

    2008-05-01

    Full Text Available Contracts paying a guaranteed minimum rate of return and a fraction of a positive excess rate, which is specified relative to a benchmark portfolio, are closely related to unit-linked life-insurance products and can be considered as alternatives to direct investment in the underlying benchmark. They contain an embedded power option, and the key issue is the tractable and realistic hedging of this option, in order to rigorously justify valuation by arbitrage arguments and prevent the guarantees from becoming uncontrollable liabilities to the issuer. We show how to determine the contract parameters conservatively and implement robust risk-management strategies.

  14. Employment effects of minimum wages

    OpenAIRE

    Neumark, David

    2014-01-01

    The potential benefits of higher minimum wages come from the higher wages for affected workers, some of whom are in low-income families. The potential downside is that a higher minimum wage may discourage employers from using the low-wage, low-skill workers that minimum wages are intended to help. Research findings are not unanimous, but evidence from many countries suggests that minimum wages reduce the jobs available to low-skill workers.

  15. Minimum-domain impulse theory for unsteady aerodynamic force

    Science.gov (United States)

    Kang, L. L.; Liu, L. Q.; Su, W. D.; Wu, J. Z.

    2018-01-01

    We extend the impulse theory for unsteady aerodynamics from its classic global form to finite-domain formulation then to minimum-domain form and from incompressible to compressible flows. For incompressible flow, the minimum-domain impulse theory raises the finding of Li and Lu ["Force and power of flapping plates in a fluid," J. Fluid Mech. 712, 598-613 (2012)] to a theorem: The entire force with discrete wake is completely determined by only the time rate of impulse of those vortical structures still connecting to the body, along with the Lamb-vector integral thereof that captures the contribution of all the rest disconnected vortical structures. For compressible flows, we find that the global form in terms of the curl of momentum ∇ × (ρu), obtained by Huang [Unsteady Vortical Aerodynamics (Shanghai Jiaotong University Press, 1994)], can be generalized to having an arbitrary finite domain, but the formula is cumbersome and in general ∇ × (ρu) no longer has discrete structures and hence no minimum-domain theory exists. Nevertheless, as the measure of transverse process only, the unsteady field of vorticity ω or ρω may still have a discrete wake. This leads to a minimum-domain compressible vorticity-moment theory in terms of ρω (but it is beyond the classic concept of impulse). These new findings and applications have been confirmed by our numerical experiments. The results not only open an avenue to combine the theory with computation-experiment in wide applications but also reveal a physical truth that it is no longer necessary to account for all wake vortical structures in computing the force and moment.

  16. Analysis of Valve Requirements for High-Efficiency Digital Displacement Fluid Power Motors

    DEFF Research Database (Denmark)

    Rømer, Daniel; Johansen, Per; Pedersen, Henrik C.

    2013-01-01

    Digital displacement fluid power motors have been shown to enable high-efficiency operation in a wide operation range, including the part load range where conventional fluid power motors suffers from poor efficiencies. The use of these digital displacement motors set new requirements for the valve...... transition time and flow-pressure coefficient are normalized, leading to a presentation of the general efficiency map of the digital displacement motor. Finally the performance of existing commercial valves with respect to digital motors is commented....

  17. An improved minimum variance beamforming applied to plane-wave imaging in medical ultrasound

    DEFF Research Database (Denmark)

    Deylami, Ali Mohades; Asl, Babak Mohammadzadeh; Jensen, Jørgen Arendt

    2016-01-01

    Minimum variance beamformer (MVB) is an adaptive beamformer which provides images with higher resolution and contrast in comparison with non-adaptive beamformers like delay and sum (DAS). It finds weight vector of beamformer by minimizing output power while keeping the desired signal unchanged. We...

  18. Analysis of Balancing Requirements in Future Sustainable and Reliable Power Systems

    International Nuclear Information System (INIS)

    Frunt, J.

    2011-01-01

    This thesis elaborates on the rules for power balancing, provides a method for quantifying balancing requirements and examines the effect of future changes on balancing. Chapter 2 elaborates on system balancing and the different actors and entities in the electricity delivery system. The necessity and implementation of power balancing are explained. Also different subsequent markets (i.e., day-ahead markets, intraday markets and imbalance settlement systems) and options to trade electricity are discussed. As the research focusses mainly on the Netherlands, properties of the Dutch imbalance settlement system are analyzed. Based on this framework an in-depth analysis of imbalances and calls for balancing capacity with the corresponding prices is given. This shows the incentives to minimize the amount of imbalance in the system and to participate in the imbalance settlement system. Chapter 3 elaborates on the level of aggregation that the entities, involved in the imbalance settlement system, in electricity markets can have. Based on current market rules, incentives to either grow or shrink and by aggregating more or less entities are discussed. The level of aggregation will directly influence the functioning of the imbalance settlement system. It is shown that larger aggregations benefit more from the canceling out of imbalances. The imbalances of the Netherlands and Belgium have been aggregated to illustrate the possible benefits of aggregating multiple national imbalance settlement systems. The increased penetration of renewable generation strongly influences the planning and operation of the power system. As many renewable energy generators have a fluctuating power output, several methods are discussed in chapter 4 that can be used to classify and quantify the balancing requirements to counteract these fluctuations. Chapter 4 discusses the multiple existing classes of balancing capacity and the corresponding methods to quantify their needs. Due to the

  19. Analysis of Balancing Requirements in Future Sustainable and Reliable Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Frunt, J.

    2011-06-01

    This thesis elaborates on the rules for power balancing, provides a method for quantifying balancing requirements and examines the effect of future changes on balancing. Chapter 2 elaborates on system balancing and the different actors and entities in the electricity delivery system. The necessity and implementation of power balancing are explained. Also different subsequent markets (i.e., day-ahead markets, intraday markets and imbalance settlement systems) and options to trade electricity are discussed. As the research focusses mainly on the Netherlands, properties of the Dutch imbalance settlement system are analyzed. Based on this framework an in-depth analysis of imbalances and calls for balancing capacity with the corresponding prices is given. This shows the incentives to minimize the amount of imbalance in the system and to participate in the imbalance settlement system. Chapter 3 elaborates on the level of aggregation that the entities, involved in the imbalance settlement system, in electricity markets can have. Based on current market rules, incentives to either grow or shrink and by aggregating more or less entities are discussed. The level of aggregation will directly influence the functioning of the imbalance settlement system. It is shown that larger aggregations benefit more from the canceling out of imbalances. The imbalances of the Netherlands and Belgium have been aggregated to illustrate the possible benefits of aggregating multiple national imbalance settlement systems. The increased penetration of renewable generation strongly influences the planning and operation of the power system. As many renewable energy generators have a fluctuating power output, several methods are discussed in chapter 4 that can be used to classify and quantify the balancing requirements to counteract these fluctuations. Chapter 4 discusses the multiple existing classes of balancing capacity and the corresponding methods to quantify their needs. Due to the

  20. The RF power system for the SNS linac

    International Nuclear Information System (INIS)

    Tallerico, P.J.; Reass, W.A.

    1998-01-01

    The initial goal of the SNS project is to produce a 1 MW average beam of protons with short pulse lengths onto a neutron-producing target. The objective of the SNS RF system is to generate 117 MW peak of pulsed 805 MHz microwave power with an accelerated beam pulse length of 1.04 ms at a 60 Hz repetition rate. The power system must be upgradeable in peak power to deliver 2 MW average power to the neutron target. The RF system also requires about 3 MW peak of RF power at 402.5 MHz, but that system is not discussed here. The design challenge is to produce an RF system at minimum cost, that is very reliable and economical to operate. The combination of long pulses and high repetition rates make conventional solutions, such as the pulse transformer and transmission line method, very expensive. The klystron, with a modulating anode, and 1.5 MW of peak output power is the baseline RF amplifier, an 56 are required in the baseline design. The authors discuss four power system configurations that are the candidates for the design. The baseline design is a floating-deck modulating anode system. A second power system being investigated is the fast-pulsed power supply, that can be turned on and off with a rise time of under 0.1 ms. This could eliminate the need for a modulator, and drastically reduce the energy storage requirements. A third idea is to use a pulse transformer with a series IGBT switch and a bouncer circuit on the primary side, as was done for the TESLA modulator. A fourth method is to use a series IGBT switch at high voltage, and not use a pulse transformer. The authors discuss the advantages and problems of these four types of power systems, but they emphasize the first two

  1. Design of arc power supply for neutral beam injection system based on super capacitor energy storage

    International Nuclear Information System (INIS)

    Yang Puqiong; Xuan Weimin; Cao Jianyong; Li Qing; Liu Xiaolong

    2015-01-01

    The arc power supply is one of the most important equipment for neutral beam injection system. The stability of arc discharge and the quality of ion beam extraction were determined by its performance. For improving stability of the arc discharge, reducing the power network capacity and decreasing impulse on power network, the topology of the arc power supply applied the structure of DC/DC converter based on technology of super capacitor energy storage and switching power supply. Several IGBT power modules are operated in parallel, and it can improve the arc power supply's operating frequency and dynamic response. A filter circuit and a current fast transferring circuit were designed based on a detailed analysis on working process of the arc power sup- ply. According to the requirements and parameters of the arc power supply, and the current response of RL first order circuit, the minimum filter inductances were accurately calculated. Finally, using the model and Matlab, the performance of the arc power supply was simulated and verified, and it meets the design requirement. (authors)

  2. Minimum acceptable face velocities of laboratory fume hoods and guidelines for their classification

    International Nuclear Information System (INIS)

    Bolton, N.E.; Porter, W.E.; Alcorn, S.P.; Everett, W.S.; Hunt, J.B.; Morehead, J.F.; Higdon, H.F.

    1978-06-01

    Data developed to support the requirement of a 100 LFM minimum face velocity requirement for laboratory fume hoods are summarized. Also included is a description of the Y-12 test hood as well as guidelines for a hood classification scheme

  3. Optimal Control of Wind Farms for Coordinated TSO-DSO Reactive Power Management

    Directory of Open Access Journals (Sweden)

    David Sebastian Stock

    2018-01-01

    Full Text Available The growing importance of renewable generation connected to distribution grids requires an increased coordination between transmission system operators (TSOs and distribution system operators (DSOs for reactive power management. This work proposes a practical and effective interaction method based on sequential optimizations to evaluate the reactive flexibility potential of distribution networks and to dispatch them along with traditional synchronous generators, keeping to a minimum the information exchange. A modular optimal power flow (OPF tool featuring multi-objective optimization is developed for this purpose. The proposed method is evaluated for a model of a real German 110 kV grid with 1.6 GW of installed wind power capacity and a reduced order model of the surrounding transmission system. Simulations show the benefit of involving wind farms in reactive power support reducing losses both at distribution and transmission level. Different types of setpoints are investigated, showing the feasibility for the DSO to fulfill also individual voltage and reactive power targets over multiple connection points. Finally, some suggestions are presented to achieve a fair coordination, combining both TSO and DSO requirements.

  4. 25 CFR 47.9 - What are the minimum requirements for the local educational financial plan?

    Science.gov (United States)

    2010-04-01

    ... EDUCATION UNIFORM DIRECT FUNDING AND SUPPORT FOR BUREAU-OPERATED SCHOOLS § 47.9 What are the minimum..., including each program funded through the Indian School Equalization Program; (2) A budget showing the costs...) Certification by the chairman of the school board that the plan has been ratified in an action of record by the...

  5. Mechanized ultrasonic examination of piping systems in nuclear power plants

    International Nuclear Information System (INIS)

    Edelmann, X.; Pfister, O.; Allidi, F.

    1988-01-01

    The success of mechanized ultrasonic examination applied on welds in piping systems in nuclear power plants is highly dependent on its careful preparation. From the development of an adequate examination technique to its implementation on site, many problems are to be solved. This is especially the case when dealing with austenitic welds or dissimilar metal welds. In addition to the specific needs for examination technique based on material properties and requirements for minimum flaw size detection, accessibility and radiation aspects have to be considered. A crew of skilled and highly trained examination personnel is required. Experience in various nuclear power plants, - BWR's and PWR's of different designs - has shown, that even difficult examination problems can be successfully solved, provided that there is a good preparation. The necessary step by step proceeding is illustrated by examples concerning mechanized examination. Preservice inspections and in-service inspections with specific requirements, due to the types of flaws to be found or the type of material concerned, are discussed

  6. A Suboptimal Power-Saving Transmission Scheme in Multiple Component Carrier Networks

    Science.gov (United States)

    Chung, Yao-Liang; Tsai, Zsehong

    Power consumption due to transmissions in base stations (BSs) has been a major contributor to communication-related CO2 emissions. A power optimization model is developed in this study with respect to radio resource allocation and activation in a multiple Component Carrier (CC) environment. We formulate and solve the power-minimization problem of the BS transceivers for multiple-CC networks with carrier aggregation, while maintaining the overall system and respective users' utilities above minimum levels. The optimized power consumption based on this model can be viewed as a lower bound of that of other algorithms employed in practice. A suboptimal scheme with low computation complexity is proposed. Numerical results show that the power consumption of our scheme is much better than that of the conventional one in which all CCs are always active, if both schemes maintain the same required utilities.

  7. New Technology for Microfabrication and Testing of a Thermoelectric Device for Generating Mobile Electrical Power

    Science.gov (United States)

    Prasad, Narasimha S.; Taylor, Patrick J.; Trivedi, Sudhir B.; Kutcher, Susan

    2012-01-01

    Thermoelectric (TE) power generation is an increasingly important power generation technology. Major advantages include: no moving parts, low-weight, modularity, covertness/silence, high power density, low amortized cost, and long service life with minimum or no required maintenance. Despite low efficiency of power generation, there are many specialized needs for electrical power that TE technologies can uniquely and successfully address. Recent advances in thermoelectric materials technology have rekindled acute interest in thermoelectric power generation. We have developed single crystalline n- and p- type PbTe crystals and are also, developing PbTe bulk nanocomposites using PbTe nano powders and emerging filed assisted sintering technology (FAST). We will discuss the materials requirements for efficient thermoelectric power generation using waste heat at intermediate temperature range (6500 to 8500 K). We will present our recent results on production of n- and p- type PbTe crystals and their thermoelectric characterization. Relative characteristics and performance of PbTe bulk single crystals and nano composites for thermoelectric power generation will be discussed.

  8. Minimum Wages and Poverty

    OpenAIRE

    Fields, Gary S.; Kanbur, Ravi

    2005-01-01

    Textbook analysis tells us that in a competitive labor market, the introduction of a minimum wage above the competitive equilibrium wage will cause unemployment. This paper makes two contributions to the basic theory of the minimum wage. First, we analyze the effects of a higher minimum wage in terms of poverty rather than in terms of unemployment. Second, we extend the standard textbook model to allow for incomesharing between the employed and the unemployed. We find that there are situation...

  9. Protocol for the verification of minimum criteria

    International Nuclear Information System (INIS)

    Gaggiano, M.; Spiccia, P.; Gaetano Arnetta, P.

    2014-01-01

    This Protocol has been prepared with reference to the provisions of article 8 of the Legislative Decree of May 26, 2000 No. 187. Quality controls of radiological equipment fit within the larger 'quality assurance Program' and are intended to ensure the correct operation of the same and the maintenance of that State. The pursuit of this objective guarantees that the radiological equipment subjected to those controls also meets the minimum criteria of acceptability set out in annex V of the aforementioned legislative decree establishing the conditions necessary to allow the functions to which each radiological equipment was designed, built and for which it is used. The Protocol is established for the purpose of quality control of radiological equipment of Cone Beam Computer Tomography type and reference document, in the sense that compliance with stated tolerances also ensures the subsistence minimum acceptability requirements, where applicable.

  10. Three Phase Power Imbalance Decomposition into Systematic Imbalance and Random Imbalance

    DEFF Research Database (Denmark)

    Kong, Wangwei; Ma, Kang; Wu, Qiuwei

    2017-01-01

    Uneven load allocations and random load behaviors are two major causes for three-phase power imbalance. The former mainly cause systematic imbalance, which can be addressed by low-cost phase swapping; the latter contribute to random imbalance, which requires relatively costly demand...... minimum phase, or both. Then, this paper proposes a new method to decompose three-phase power series into a systematic imbalance component and a random imbalance component as the closed-form solutions of quadratic optimization models that minimize random imbalance. A degree of power imbalance...... is calculated based on the systematic imbalance component to guide phase swapping. Case studies demonstrate that 72.8% of 782 low voltage substations have systematic imbalance components. The degree of power imbalance results reveal the maximum need for phase swapping and the random imbalance components reveal...

  11. Heat rate curve approximation for power plants without data measuring devices

    Energy Technology Data Exchange (ETDEWEB)

    Poullikkas, Andreas [Electricity Authority of Cyprus, P.O. Box 24506, 1399 Nicosia (CY

    2012-07-01

    In this work, a numerical method, based on the one-dimensional finite difference technique, is proposed for the approximation of the heat rate curve, which can be applied for power plants in which no data acquisition is available. Unlike other methods in which three or more data points are required for the approximation of the heat rate curve, the proposed method can be applied when the heat rate curve data is available only at the maximum and minimum operating capacities of the power plant. The method is applied on a given power system, in which we calculate the electricity cost using the CAPSE (computer aided power economics) algorithm. Comparisons are made when the least squares method is used. The results indicate that the proposed method give accurate results.

  12. Manpower and training requirements for operation and maintenance of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Shah, J.C.

    1975-01-01

    The experience in India with regard to the staffing of nuclear power station operations and maintenance is encouraging in the sense that given the effort and time, developing countries should not find it unduly difficult to meet their requirements. (orig.) [de

  13. Estimation of Minimum DNBR Using Cascaded Fuzzy Neural Networks

    International Nuclear Information System (INIS)

    Kim, Dong Yeong; Yoo, Kwae Hwan; Na, Man Gyun

    2015-01-01

    This phenomenon of boiling crisis is called a departure from nucleate boiling (DNB). The DNB phenomena can influence the fuel cladding and fuel pellets. The DNB ratio (DNBR) is defined as the ratio of the expected DNB heat flux to the actual fuel rod heat flux. Since it is very important to monitor and predict the minimum DNBR in a reactor core to prevent the boiling crisis and clad melting, a number of researches have been conducted to predict DNBR values. The aim of this study is to estimate the minimum DNBR in a reactor core using the measured signals of the reactor coolant system (RCS) by applying cascaded fuzzy neural networks (CFNN) according to operating conditions. Reactor core monitoring and protection systems require minimum DNBR prediction. The CFNN can be used to optimize the minimum DNBR value through the process of adding fuzzy neural networks (FNN) repeatedly. The proposed algorithm is trained by using the data set prepared for training (development data) and verified by using another data set different (independent) from the development data. The developed CFNN models were applied to the first fuel cycle of OPR1000. The RMS errors are 0.23% and 0.12% for the positive and negative ASI, respectively

  14. Requirements for auditing of quality assurance programs for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Requirements and guidance are provided for establishing and implementing a system of internal and external audits of quality assurance programs for nuclear power plants, including the preparation, performance, reporting and follow-up of audits by both the auditing and the audited organizations. This standard is to be used in conjunction with ANSI N45.2

  15. Discussion on several important safety requirements for the new nuclear power plant

    International Nuclear Information System (INIS)

    Yan Tianwen; Li Jigen; Zhang Lin; Feng Youcai; Jia Xiang; Li Wenhong

    2013-01-01

    Post the Fukushima nuclear accident, the Chinese government raised higher safety goals and safety requirements for the new nuclear power plant to be constructed. The paper expounded the important indicators of safety requirements and the aspects of safety modification that had been developed for the new NPPs. It also discussed and analyzed the main fields required by the new NPPs safety requirements in the safety goals, safety evaluation of sites, defenses of internal and external events, severe accident prevention and mitigation, design of reactor core, containment system and I and C system, and optimization of engineering measure, which gave some references to the design, construction and safety modifications of new NPPs in China. (authors)

  16. Calculation of the power distribution in the fuel rods of the low power research reactor using the MCNP4C code

    International Nuclear Information System (INIS)

    Dawahra, S.; Khattab, K.

    2011-01-01

    Highlights: → The MCNP4C code was used to calculate the power distribution in 3-D geometry in the MNSR reactor. → The maximum power of the individual rod was found in the fuel ring number 2 and was found to be 105 W. → The minimum power was found in the fuel ring number 9 and was 79.9 W. → The total power in the total fuel rods was 30.9 kW. - Abstract: The Monte Carlo method, using the MCNP4C code, was used in this paper to calculate the power distribution in 3-D geometry in the fuel rods of the Syrian Miniature Neutron Source Reactor (MNSR). To normalize the MCNP4C result to the steady state nominal thermal power, the appropriate scaling factor was defined to calculate the power distribution precisely. The maximum power of the individual rod was found in the fuel ring number 2 and was found to be 105 W. The minimum power was found in the fuel ring number 9 and was 79.9 W. The total power in the total fuel rods was 30.9 kW. This result agrees very well with nominal power reported in the reactor safety analysis report which equals 30 kW. Finally, the peak power factors, which are defined as the ratios between the maximum to the average and the maximum to the minimum powers were calculated to be 1.18 and 1.31 respectively.

  17. SMART core power control method by coolant temperature variation

    International Nuclear Information System (INIS)

    Lee, Chung Chan; Cho, Byung Oh

    2001-08-01

    SMART is a soluble boron-free integral type pressurized water reactor. Its moderator temperature coefficient (MTC) is strongly negative throughout the cycle. The purpose of this report is how to utilize the primary coolant temperature as a second reactivity control system using the strong negative MTC. The reactivity components associated with reactor power change are Doppler reactivity due to fuel temperature change, moderator temperature reactivity and xenon reactivity. Doppler reactivity and moderator temperature reactivity take effects almost as soon as reactor power changes. On the other hand, xenon reactivity change takes more than several hours to reach an equilibrium state. Therefore, coolant temperature at equilibrium state is chosen as the reference temperature. The power dependent reference temperature line is limited above 50% power not to affect adversely in reactor safety. To compensate transient xenon reactivity, coolant temperature operating range is expanded. The suggested coolant temperature operation range requires minimum control rod motion for 50% power change. For smaller power changes such as 25% power change, it is not necessary to move control rods to assure that fuel design limits are not exceeded

  18. Concept of underground nuclear power plant

    International Nuclear Information System (INIS)

    Onishi, Sotoaki

    1976-01-01

    The concept of constructing nuclear power plants on the sea or underground as the future sitting is based on moving the present power plants on the ground with actual results to the sea or underground without changing the design. The underground nuclear power plants have many similar points to underground hydro-electric power stations with many achievements in the construction viewpoint, though they have their proper difficult problems. Of course, it requires to excavate larger underground caves than the case of underground hydro-electric power plants. The maximum dimensions of the caves have been determined through experience in practice. Therefore the developments of design theory and construction technique are desirable in this field. In discussing underground construction, two evaluating methods are considered for the shielding effect of base rocks. The minimum vertical distance up to ground surface from the center of the cave differs depending upon the in-cave pressure, and the conditions of base rock, soil and underground water in case of the accident assumed in the design, and is approximately 60m, if the cave is assumed to be an indefinite cylindrical shape, by the safer side calculation in the above two evaluations. (Wakatsuki, Y.)

  19. Uranium requirements for advanced fuel cycles in expanding nuclear power systems

    International Nuclear Information System (INIS)

    Banerjee, S.; Tamm, H.

    1978-01-01

    When considering advanced fuel cycle strategies in rapidly expanding nuclear power systems, equilibrium analyses do not apply. A computer simulation that accounts for system delay times and fissile inventories has been used to study the effects of different fuel cycles and different power growth rates on uranium consumption. The results show that for a given expansion rate of installed capacity, the main factors that affect resource requirements are the fissile inventory needed to introduce the advanced fuel cycle and the conversion (or breeding) ratio. In rapidly expanding systems, the effect of fissile inventory dominates, whereas in slowly expanding systems, conversion or breeding ratio dominates. Heavy-water-moderated and -cooled reactors, with their high conversion ratios, appear to be adaptable vehicles for accommodating fuel cycles covering a wide range of initial fissile inventories. They are therefore particularly suitable for conserving uranium over a wide range of nuclear power system expansion rates

  20. General requirements for pressure-retaining systems and components in CANDU nuclear power plants

    International Nuclear Information System (INIS)

    1991-11-01

    This standard specifies the general requirements for the design, fabrication and installation of pressure-retaining systems, components, and their supports in CANDU nuclear power plants. (16 figs., 2 tabs., 25 refs.)

  1. Economic optimization of the energy transport component of a large distributed solar power plant

    Science.gov (United States)

    Turner, R. H.

    1976-01-01

    A solar thermal power plant with a field of collectors, each locally heating some transport fluid, requires a pipe network system for eventual delivery of energy power generation equipment. For a given collector distribution and pipe network geometry, a technique is herein developed which manipulates basic cost information and physical data in order to design an energy transport system consistent with minimized cost constrained by a calculated technical performance. For a given transport fluid and collector conditions, the method determines the network pipe diameter and pipe thickness distribution and also insulation thickness distribution associated with minimum system cost; these relative distributions are unique. Transport losses, including pump work and heat leak, are calculated operating expenses and impact the total system cost. The minimum cost system is readily selected. The technique is demonstrated on six candidate transport fluids to emphasize which parameters dominate the system cost and to provide basic decision data. Three different power plant output sizes are evaluated in each case to determine severity of diseconomy of scale.

  2. CRISP. Requirements Specifications of Intelligent ICT Simulation Tools for Power Applications

    Energy Technology Data Exchange (ETDEWEB)

    Warmer, C.J.; Kester, J.C.P.; Kamphuis, I.G. [ECN Energy in the Built Environment and Networks, Petten (Netherlands); Carlsson, P [EnerSearch, Malmoe (Sweden); Fontela, M. [Laboratory of Electrical Engineering LEG, Grenoble (France); Gustavsson, R. [Blekinge Institute of Technology BTH, Karlskrona (Sweden)

    2003-10-15

    This report, deliverable D2.1 in the CRISP project, serves as a preparation report for the development of simulation tools and prototype software which will be developed in forthcoming stages of the CRISP project. Application areas for these simulations are: fault detection and diagnosis, supply and demand matching and intelligent load shedding. The context in which these applications function is the power network with a high degree of distributed generation, including renewables. In order to control a so called distributed grid we can benefit from a high level of distributed control and intelligence. This requires, on top of the power system network, an information and communication network.. We argue that such a network should be seen as an enabler of distributed control and intelligence. The applications, through which control and intelligence is implemented, then form a third network layer, the service oriented network. Building upon this three-layered network model we derive in this report the requirements for a simulation tool and experiments which study new techniques for fault detection and diagnostics and for simulation tools and experiments implementing intelligent load shedding and supply and demand matching scenarios. We also look at future implementation of these services within the three-layered network model and the requirements that follow for the core information and communication network and for the service oriented network. These requirements, supported by the studies performed in the CRISP Workpackage 1, serve as a basis for development of the simulation tools in the tasks 2.2 to 2.4.

  3. CRISP. Requirements Specifications of Intelligent ICT Simulation Tools for Power Applications

    International Nuclear Information System (INIS)

    Warmer, C.J.; Kester, J.C.P.; Kamphuis, I.G.; Carlsson, P; Fontela, M.; Gustavsson, R.

    2003-10-01

    This report, deliverable D2.1 in the CRISP project, serves as a preparation report for the development of simulation tools and prototype software which will be developed in forthcoming stages of the CRISP project. Application areas for these simulations are: fault detection and diagnosis, supply and demand matching and intelligent load shedding. The context in which these applications function is the power network with a high degree of distributed generation, including renewables. In order to control a so called distributed grid we can benefit from a high level of distributed control and intelligence. This requires, on top of the power system network, an information and communication network.. We argue that such a network should be seen as an enabler of distributed control and intelligence. The applications, through which control and intelligence is implemented, then form a third network layer, the service oriented network. Building upon this three-layered network model we derive in this report the requirements for a simulation tool and experiments which study new techniques for fault detection and diagnostics and for simulation tools and experiments implementing intelligent load shedding and supply and demand matching scenarios. We also look at future implementation of these services within the three-layered network model and the requirements that follow for the core information and communication network and for the service oriented network. These requirements, supported by the studies performed in the CRISP Workpackage 1, serve as a basis for development of the simulation tools in the tasks 2.2 to 2.4

  4. A Use Case Methodology to Handle Conflicting Controller Requirements for Future Power Systems

    DEFF Research Database (Denmark)

    Heussen, Kai; Uslar, Mathias; Tornelli, Carlo

    2015-01-01

    This paper proposes a standards based requirements elicitation and analysis strategy tailored for smart grid control structure development. Control structures in electric power systems often span across several systems and stakeholders. Requirements elicitation for such control systems therefore...... requires coordination across many stakeholders and it is challenging to achieve a consistent design. To enable an iterative and distributed development we suggest a conflict management approach as a modular element of the design strategy, focusing on conflict identification and tracing. The idea...

  5. Minimum critical mass systems

    International Nuclear Information System (INIS)

    Dam, H. van; Leege, P.F.A. de

    1987-01-01

    An analysis is presented of thermal systems with minimum critical mass, based on the use of materials with optimum neutron moderating and reflecting properties. The optimum fissile material distributions in the systems are obtained by calculations with standard computer codes, extended with a routine for flat fuel importance search. It is shown that in the minimum critical mass configuration a considerable part of the fuel is positioned in the reflector region. For 239 Pu a minimum critical mass of 87 g is found, which is the lowest value reported hitherto. (author)

  6. Forecasting manpower requirements for nuclear power plant construction

    International Nuclear Information System (INIS)

    Seltzer, N.; Schriver, W.R.

    1978-01-01

    This paper presents both the methodology and results of a segment of a comprehensive construction manpower demand forecasting system aimed at forecasting virtually all construction manpower requirements in the United States of America. The part of the system dealing with the demand for construction workers needed to build nuclear powered electricity generating plants is discussed here. The object of the system is to forecast manpower construction needs for each of 29 construction crafts on a monthly basis in each of 10 geographical regions of the United States. The method used is to establish profiles of the types of workers and time phasing required in the past. Profiling was done for different types of plants, different capacity classes, and different geographical locations. An appropriate worker profile matrix cannot simply be multiplied by the capacity of the proposed plant if the number of man-hours required per kilowatt of generating capacity is not constant. The value of this latter variable has changed considerably recently - presumably because of an increased awareness of environmental and safety considerations. Econometric techniques are used to forecast values for man-hours per kilowatt which are then multiplied by projected new capacity to be put in place. The resulting total man-hour requirement is then allocated over time and by craft through use of a worker profile matrix. The summary results indicate that 20 percent increases in man-hours required per kilowatt of capacity can be expected between 1977 and 1981. Total construction labour demand will rise from 65,700 work-years in 1977 to nearly 96,600 work-years in 1981. Forecasts of the actual number of different types of workers to be demanded in each month and in each region are available from the system. (author)

  7. Considerations on the need for electricity storage requirements: Power versus energy

    International Nuclear Information System (INIS)

    Belderbos, Andreas; Virag, Ana; D’haeseleer, William; Delarue, Erik

    2017-01-01

    Highlights: • General storage principles are analyzed. • Storage units have different limitations (power versus energy). • Storage power and energy are required, dependent on residual profile. • Relationship between residual profile and optimal storage portfolio is derived. • Broadly applicable rules regarding optimal storage investments are presented. - Abstract: Different storage technologies enable an increasing share of variable renewable generation in the electricity system by reducing the temporal mismatch between generation and demand. Two storage ratings are essential to time-shift delivery of electricity to loads: electric power, or instantaneous electricity flow [W], and electric energy, or power integrated over time [Wh]. An optimal storage portfolio is likely composed of multiple technologies, each having specific power and energy ratings. This paper derives and explains the link between the shape of the time-varying demand and generation profiles and the amount of desirably installed storage capacity, both energy and power. An analysis is performed for individual storage technologies first, showing a link between the necessary power and energy capacity and the demand and generation profile. Then combinations of storage technologies are analyzed to reveal their mutual interaction in a storage portfolio. Results show an increase in desirability for storage technologies with low cost power ratings when the mismatch between generation and demand occurs in daily to weekly cycles. Storage technologies with low cost energy ratings are preferred when this mismatch occurs in monthly to seasonal cycles. The findings of this work can help energy system planners and policy makers to explain results from generation expansion planning studies and to isolate the storage benefits accountable to temporal arbitrage in broader electricity storage studies.

  8. Solar electric power for instruments at remote sites

    Science.gov (United States)

    McChesney, P.J.

    2000-01-01

    Small photovoltaic (PV) systems are the preferred method to power instruments operating at permanent locations away from the electric power grid. The low-power PV power system consists of a solar panel or small array of panels, lead-acid batteries, and a charge controller. Even though the small PV power system is simple, the job of supplying power at a remote site can be very demanding. The equipment is often exposed to harsh conditions. The site may be inaccessible part of the year or difficult and expensive to reach at any time. Yet the system must provide uninterrupted power with minimum maintenance at low cost. This requires good design. Successful small PV systems often require modifications by a knowledgeable fieldworker to adapt to conditions at the site. Much information is available in many places about solar panels, lead-acid batteries, and charging systems but very little of it applies directly to low power instrument sites. The discussion here aims to close some of the gap. Each of the major components is described in terms of this application with particular attention paid to batteries. Site problems are investigated. Finally, maintenance and test procedures are given. This document assumes that the reader is engaged in planning or maintaining low-power PV sites and has basic electrical and electronic knowledge. The area covered by the discussion is broad. To help the reader with the many terms and acronyms used, they are shown in bold when first used and a glossary is provided at the end of the paper.

  9. Lithuanian requirements for ageing management of systems and components important to safety of nuclear power plant

    International Nuclear Information System (INIS)

    Ramanauskiene, A.

    2000-01-01

    In this paper the Lithuanian requirements for ageing management of systems and components important to safety of Ignalina nuclear power plant (two RBMK-1500 water-cooled graphite moderated channel-type power reactors) are presented

  10. Detection of minimum-ionizing particles in hydrogenated amorphous silicon

    International Nuclear Information System (INIS)

    Kaplan, S.N.; Fujieda, I.; Perez-Mendez, V.; Qureshi, S.; Ward, W.; Street, R.A.

    1987-09-01

    Based on previously-reported results of the successful detection of alpha particles and 1- and 2-MeV protons with hydrogenated amorphous silicon (a-Si : H) diodes, detection of a single minimum-ionizing particle will require a total sensitive thickness of approximately 100 to 150 μm, either in the form of a single thick diode, or as a stack of several thinner diodes. Signal saturation at high dE/dx makes it necessary to simulate minimum ionization in order to evaluate present detectors. Two techniques, using pulsed infrared light, and pulsed x-rays, give single-pulse signals large enough for direct measurements. A third, using beta rays, requires multiple-transit signal averaging to produce signals measurable above noise. Signal amplitudes from the a-Si : H limit at 60% of the signal size from Si crystals extrapolated to the same thickness. This is consistent with an a-Si : H radiation ionization energy, W = 6 eV/electron-hole pair. Beta-ray signals are observed at the expected amplitude

  11. Determination of Minimum Air Clearances for a 420kV Novel Unibody Composite Cross-Arm

    DEFF Research Database (Denmark)

    Jahangiri, Tohid; Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2015-01-01

    One of the most important requirements of any overhead line tower is determining the air clearances between live parts and earthed parts such as phase conductor and tower structure. In contrast to traditional steel lattice towers, the recently introduced fully composite pylon is completely made....... This paper presents the insulation coordination studies to determine minimum required air clearances on the unibody cross-arm. The procedure and relevant equations to calculate minimum air clearances to avoid flashover between phases’ conductors as well as top phase conductor and shield wire are based...

  12. A Hybrid Optimization Method for Reactive Power and Voltage Control Considering Power Loss Minimization

    DEFF Research Database (Denmark)

    Liu, Chengxi; Qin, Nan; Bak, Claus Leth

    2015-01-01

    This paper proposes a hybrid optimization method to optimally control the voltage and reactive power with minimum power loss in transmission grid. This approach is used for the Danish automatic voltage control (AVC) system which is typically a non-linear non-convex problem mixed with both...

  13. 5 CFR 551.301 - Minimum wage.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Minimum wage. 551.301 Section 551.301... FAIR LABOR STANDARDS ACT Minimum Wage Provisions Basic Provision § 551.301 Minimum wage. (a)(1) Except... employees wages at rates not less than the minimum wage specified in section 6(a)(1) of the Act for all...

  14. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  15. Design requirements document for the phase 1 privatization electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract

  16. Device for the nuclear reactor automatic start-up and power control

    International Nuclear Information System (INIS)

    Nikiforov, B.N.; Volkov, A.V.; Ogon'kov, A.I.

    1978-01-01

    A description and flowsheet of a reactor start-up and power-control automatic device containing no nonlinear elements with a relay characteristic are presented. The device consists of two independent channels for measuring the physical power and time (period) constant of the reactor. Requirements for the device are considered, based on the condition of a minimum permissible number of a servomechanism operations due to fluctuations of an input signal which appear because of the statistical nature of processes taking place in the reactor. It is noted that the threshold amplifier used in the device allows a considerable decrease of the reactor start-up time

  17. Evaluation of the potential of ozone as a power plant biocide

    Energy Technology Data Exchange (ETDEWEB)

    Mattice, J.S.; Trabalka, J.R.; Adams, S.M.; Faust, R.A.; Jolley, R.L.

    1978-09-01

    A review of the literature on the chemistry and biological effects of ozone was conducted to evaluate the potential of ozone to function as a power plant biocide. Evaluation of this potential is dependent upon determining the ability of ozone to maintain the integrity of both the condenser cooling system and the associated ecosystem. The well-known bactericidal capacity of ozone and the limited biofouling control studies conducted thus far suggest that ozone can control both slime and macroinvertebrate fouling at power plants. However, full-scale demonstrations of the minimum levels of ozone required and of solution of the practical aspects of application have not been performed.

  18. The minimum information required for a glycomics experiment (MIRAGE) project: sample preparation guidelines for reliable reporting of glycomics datasets.

    Science.gov (United States)

    Struwe, Weston B; Agravat, Sanjay; Aoki-Kinoshita, Kiyoko F; Campbell, Matthew P; Costello, Catherine E; Dell, Anne; Ten Feizi; Haslam, Stuart M; Karlsson, Niclas G; Khoo, Kay-Hooi; Kolarich, Daniel; Liu, Yan; McBride, Ryan; Novotny, Milos V; Packer, Nicolle H; Paulson, James C; Rapp, Erdmann; Ranzinger, Rene; Rudd, Pauline M; Smith, David F; Tiemeyer, Michael; Wells, Lance; York, William S; Zaia, Joseph; Kettner, Carsten

    2016-09-01

    The minimum information required for a glycomics experiment (MIRAGE) project was established in 2011 to provide guidelines to aid in data reporting from all types of experiments in glycomics research including mass spectrometry (MS), liquid chromatography, glycan arrays, data handling and sample preparation. MIRAGE is a concerted effort of the wider glycomics community that considers the adaptation of reporting guidelines as an important step towards critical evaluation and dissemination of datasets as well as broadening of experimental techniques worldwide. The MIRAGE Commission published reporting guidelines for MS data and here we outline guidelines for sample preparation. The sample preparation guidelines include all aspects of sample generation, purification and modification from biological and/or synthetic carbohydrate material. The application of MIRAGE sample preparation guidelines will lead to improved recording of experimental protocols and reporting of understandable and reproducible glycomics datasets. © The Author 2016. Published by Oxford University Press. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  19. Design approach for solar cell and battery of a persistent solar powered GPS tracker

    Science.gov (United States)

    Sahraei, Nasim; Watson, Sterling M.; Pennes, Anthony; Marius Peters, Ian; Buonassisi, Tonio

    2017-08-01

    Sensors with wireless communication can be powered by photovoltaic (PV) devices. However, using solar power requires thoughtful design of the power system, as well as a careful management of the power consumption, especially for devices with cellular communication (because of their higher power consumption). A design approach can minimize system size, weight, and/or cost, while maximizing device performance (data transmission rate and persistence). In this contribution, we describe our design approach for a small form-factor, solar-powered GPS tracker with cellular communication. We evaluate the power consumption of the device in different stages of operation. Combining measured power consumption and the calculated energy-yield of a solar cell, we estimate the battery capacity and solar cell area required for 5 years of continuous operation. We evaluate trade-offs between PV and battery size by simulating the battery state of charge. The data show a trade-off between battery capacity and solar-cell area for given target data transmission rate and persistence. We use this analysis to determine the combination of solar panel area and battery capacity for a given application and the data transmission rate that results in minimum cost or total weight of the system.

  20. Pediatric Program Director Minimum Milestone Expectations before Allowing Supervision of Others and Unsupervised Practice.

    Science.gov (United States)

    Li, Su-Ting T; Tancredi, Daniel J; Schwartz, Alan; Guillot, Ann; Burke, Ann E; Trimm, R Franklin; Guralnick, Susan; Mahan, John D; Gifford, Kimberly

    2018-04-25

    The Accreditation Council for Graduate Medical Education requires semiannual Milestone reporting on all residents. Milestone expectations of performance are unknown. Determine pediatric program director (PD) minimum Milestone expectations for residents prior to being ready to supervise and prior to being ready to graduate. Mixed methods survey of pediatric PDs on their programs' Milestone expectations before residents are ready to supervise and before they are ready to graduate, and in what ways PDs use Milestones to make supervision and graduation decisions. If programs had no established Milestone expectations, PDs indicated expectations they considered for use in their program. Mean minimum Milestone level expectations adjusted for program size, region, and clustering of Milestone expectations by program were calculated for prior to supervise and prior to graduate. Free-text questions were analyzed using thematic analysis. The response rate was 56.8% (113/199). Most programs had no required minimum Milestone level before residents are ready to supervise (80%; 76/95) or ready to graduate (84%; 80/95). For readiness to supervise, minimum Milestone expectations PDs considered establishing for their program were highest for humanism (2.46, 95% CI: 2.21-2.71) and professionalization (2.37, 2.15-2.60). Minimum Milestone expectations for graduates were highest for help-seeking (3.14, 2.83-3.46). Main themes included the use of Milestones in combination with other information to assess learner performance and Milestones are not equally weighted when making advancement decisions. Most PDs have not established program minimum Milestones, but would vary such expectations by competency. Copyright © 2018. Published by Elsevier Inc.

  1. Guideline on radiation protection requirements for ionizing radiation shielding in nuclear power plants

    International Nuclear Information System (INIS)

    1988-01-01

    The guideline which entered into force on 1 May 1988 stipulates the radiation protection requirements for shielding against ionizing radiation to be met in the design, construction, commissioning, operation, and decommissioning of nuclear power plants

  2. Trimode optimizes hybrid power plants. Final report: Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    O`Sullivan, G.A.; O`Sullivan, J.A. [Abacus Controls, Inc., Somerville, NJ (United States)

    1998-07-01

    In the Phase 2 project, Abacus Controls Inc. did research and development of hybrid systems that combine the energy sources from photovoltaics, batteries, and diesel-generators and demonstrated that they are economically feasible for small power plants in many parts of the world. The Trimode Power Processor reduces the fuel consumption of the diesel-generator to its minimum by presenting itself as the perfect electrical load to the generator. A 30-kW three-phase unit was tested at Sandia National Laboratories to prove its worthiness in actual field conditions. The use of photovoltaics at remote locations where reliability of supply requires a diesel-generator will lower costs to operate by reducing the run time of the diesel generator. The numerous benefits include longer times between maintenance for the diesel engine and better power quality from the generator. 32 figs.

  3. Chemical process measurements in PWR-type nuclear power plants

    International Nuclear Information System (INIS)

    Glaeser, E.

    1978-01-01

    In order to achieve high levels of availability of nuclear power plants equipped with pressurized water reactors, strict standards have to be applied to the purity of coolant and of other media. Chemical process measurements can meet these requirements only if programmes are established giving maximum information with minimum expenditure and if these programmes are realized with effective analytical methods. Analysis programmes known from literature are proved for their usefulness, and hints are given for establishing rational programmes. Analytical techniques are compared with each other taking into consideration both methods which have already been introduced into nuclear power plant practice and methods not yet generally used in practice, such as atomic absorption spectrophotometry, gas chromatography, etc. Finally, based on the state of the art of chemical process measurements in nuclear power plants, the trends of future development are pointed out. (author)

  4. Neural net based determination of generator-shedding requirements in electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Djukanovic, M [Electrical Engineering Inst. ' Nikola Tesla' , Belgrade (Yugoslavia); Sobajic, D J; Pao, Y -H [Case Western Reserve Univ., Cleveland, OH (United States). Dept. of Electrical Engineering and Applied Physics Case Western Reserve Univ., Cleveland, OH (United States). Dept. of Computer Engineering and Science AI WARE Inc., Cleveland, OH (United States)

    1992-09-01

    This paper presents an application of artificial neural networks (ANN) in support of a decision-making process by power system operators directed towards the fast stabilisation of multi-machine systems. The proposed approach considers generator shedding as the most effective discrete supplementary control for improving the dynamic performance of faulted power systems and preventing instabilities. The sensitivity of the transient energy function (TEF) with respect to changes in the amount of dropped generation is used during the training phase of ANNs to assess the critical amount of generator shedding required to prevent the loss of synchronism. The learning capabilities of neural nets are used to establish complex mappings between fault information and the amount of generation to be shed, suggesting it as the control signal to the power system operator. (author)

  5. Energy-saving modification on outdoor lighting in the nuclear power plant

    International Nuclear Information System (INIS)

    Yao Bo

    2010-01-01

    The outdoor lighting in the nuclear power plant don't automatically shut down,and cause lights to be long-light. It is proposed to install light-control switches in the electric circuit in order to achieve automatic control. The original outdoor lighting circuit uses the circuit breaker for over-current protection and short circuit fault protection, and use remote circuit breaker to manually operate the lamp on and off.Each circuit branch installs a light-control switch, and set the threshold of 100 lux for the light-control switch. When the natural illumination meet the minimum illumination requirement (> 100lux), the lights shut down the power.When natural illumination doesn't meet the lighting requirement (<100lux), the lighting automatically close.After the modification, it is resolved the outdoor lighting easily becoming a long light,and save energy. (authors)

  6. Controlled procurement for nuclear power plants

    International Nuclear Information System (INIS)

    MacFarlane, I.S.

    1985-01-01

    A method is presented for establishing a controlled materials management system that facilitates materials procurement at nuclear power plants. This method is based on the determination of informational data requirements, appropriate input and approvals, and extent of administrative controls. Implementation of the techniques described herein will ensure that the accuracy of important procurement information is not compromised by unauthorized initial input or changes and/or failure to maintain the information. Needed material can thus be ordered through the materials management system with a high degree of confidence that the correct items are ordered, with minimal internal lead time and minimum delays during the receiving process

  7. Experimental and theoretical study on minimum achievable foil thickness during asymmetric rolling.

    Directory of Open Access Journals (Sweden)

    Delin Tang

    Full Text Available Parts produced by microforming are becoming ever smaller. Similarly, the foils required in micro-machines are becoming ever thinner. The asymmetric rolling technique is capable of producing foils that are thinner than those produced by the conventional rolling technique. The difference between asymmetric rolling and conventional rolling is the 'cross-shear' zone. However, the influence of the cross-shear zone on the minimum achievable foil thickness during asymmetric rolling is still uncertain. In this paper, we report experiments designed to understand this critical influencing factor on the minimum achievable thickness in asymmetric rolling. Results showed that the minimum achievable thickness of rolled foils produced by asymmetric rolling with a rolling speed ratio of 1.3 can be reduced to about 30% of that possible by conventional rolling technique. Furthermore, the minimum achievable thickness during asymmetric rolling could be correlated to the cross-shear ratio, which, in turn, could be related to the rolling speed ratio. From the experimental results, a formula to calculate the minimum achievable thickness was established, considering the parameters cross-shear ratio, friction coefficient, work roll radius, etc. in asymmetric rolling.

  8. Experimental and theoretical study on minimum achievable foil thickness during asymmetric rolling.

    Science.gov (United States)

    Tang, Delin; Liu, Xianghua; Song, Meng; Yu, Hailiang

    2014-01-01

    Parts produced by microforming are becoming ever smaller. Similarly, the foils required in micro-machines are becoming ever thinner. The asymmetric rolling technique is capable of producing foils that are thinner than those produced by the conventional rolling technique. The difference between asymmetric rolling and conventional rolling is the 'cross-shear' zone. However, the influence of the cross-shear zone on the minimum achievable foil thickness during asymmetric rolling is still uncertain. In this paper, we report experiments designed to understand this critical influencing factor on the minimum achievable thickness in asymmetric rolling. Results showed that the minimum achievable thickness of rolled foils produced by asymmetric rolling with a rolling speed ratio of 1.3 can be reduced to about 30% of that possible by conventional rolling technique. Furthermore, the minimum achievable thickness during asymmetric rolling could be correlated to the cross-shear ratio, which, in turn, could be related to the rolling speed ratio. From the experimental results, a formula to calculate the minimum achievable thickness was established, considering the parameters cross-shear ratio, friction coefficient, work roll radius, etc. in asymmetric rolling.

  9. Man as a protective barrier in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1980-01-01

    Evaluation of nuclear power plant incidents frequently reveals man as a major element of risk. Yet, in a nuclear power plant man has the function of an important protective barrier, either by maintaining the plant, by detecting and limiting faults or incidents, or by taking proper measures in accidents. This is true despite, or perhaps because of, the high degree of plant automation. For this reason, it is indispensable that a high level of engineered plant safeguards be accompanied by a minimum of faults contributed by human action. This implies that the staff and their working conditions must meet the same stringent safety requirements as the nuclear power plant proper. Reactor manufacturers, nuclear power plant operators and the responsible authorities try to optimize this human contribution. The Federal Ministry of the Interior, through its Special Technical Guidelines and its continuation training measures, occupies an important position in this respect. Further measures and ordinances are being prepared by that Ministry. (orig.) [de

  10. A fresh look at electron cyclotron current drive power requirements for stabilization of tearing modes in ITER

    Energy Technology Data Exchange (ETDEWEB)

    La Haye, R. J., E-mail: lahaye@fusion.gat.com [General Atomics, P.O. Box 85608, San Diego, California 92186-5608 (United States)

    2015-12-10

    ITER is an international project to design and build an experimental fusion reactor based on the “tokamak” concept. ITER relies upon localized electron cyclotron current drive (ECCD) at the rational safety factor q=2 to suppress or stabilize the expected poloidal mode m=2, toroidal mode n=1 neoclassical tearing mode (NTM) islands. Such islands if unmitigated degrade energy confinement, lock to the resistive wall (stop rotating), cause loss of “H-mode” and induce disruption. The International Tokamak Physics Activity (ITPA) on MHD, Disruptions and Magnetic Control joint experiment group MDC-8 on Current Drive Prevention/Stabilization of Neoclassical Tearing Modes started in 2005, after which assessments were made for the requirements for ECCD needed in ITER, particularly that of rf power and alignment on q=2 [1]. Narrow well-aligned rf current parallel to and of order of one percent of the total plasma current is needed to replace the “missing” current in the island O-points and heal or preempt (avoid destabilization by applying ECCD on q=2 in absence of the mode) the island [2-4]. This paper updates the advances in ECCD stabilization on NTMs learned in DIII-D experiments and modeling during the last 5 to 10 years as applies to stabilization by localized ECCD of tearing modes in ITER. This includes the ECCD (inside the q=1 radius) stabilization of the NTM “seeding” instability known as sawteeth (m/n=1/1) [5]. Recent measurements in DIII-D show that the ITER-similar current profile is classically unstable, curvature stabilization must not be neglected, and the small island width stabilization effect from helical ion polarization currents is stronger than was previously thought [6]. The consequences of updated assumptions in ITER modeling of the minimum well-aligned ECCD power needed are all-in-all favorable (and well-within the ITER 24 gyrotron capability) when all effects are included. However, a “wild card” may be broadening of the localized

  11. Design of a Solid-State Fast Voltage Compensator for klystron modulators requiring constant AC power consumption

    CERN Document Server

    Aguglia, Davide; Viarouge, Philippe; Cros, Jerome

    2014-01-01

    This paper proposes a novel topological solution for klystron modulators integrating a Fast Voltage Compensator which allows an operation at constant power consumption from the utility grid. This kind of solution is mandatory for the CLIC project under study, which requires several hundreds of synchronously operated klystron modulators for a total pulsed power of 39 GW. The topology is optimized for the challenging CLIC specifications, which require a very precise output voltage flat-top as well as fast rise and fall times (3µs). The Fast Voltage Compensator is integrated in the modulator such that it only has to manage the capacitor charger current and a fraction of the charging voltage. Consequently, its dimensioning power and cost is minimized.

  12. On the Use of Tunable Power Splitter for Simultaneous Wireless Information and Power Transfer Receivers

    Directory of Open Access Journals (Sweden)

    Abdul Quddious

    2018-01-01

    Full Text Available The use of a tunable power splitter (PS as a constituent component of a simultaneous wireless information and power transfer (SWIPT system is discussed. Two varactor diodes are used to achieve a tunable output power ratio P2 : P3 varying from 1 : 1 to 1 : 10 under good matching conditions. The SWIPT system that operates at 2.4 GHz consists of a typical patch antenna, cascaded with the tunable PS, and a voltage doubler rectifier. The constituent components were implemented and tested as stand-alone devices and were subsequently combined in a measurement system using interconnectors. The effect of the tunable PS was explored with respect to the SNR measurements on the port that is intended for the information decoding receiver and the DC voltage measurements on the termination load of the rectifier that is connected directly on the energy harvesting port of the tunable PS. A spectrum analyzer is used for the SNR measurements while the input power is controlled using a signal generator. Both wireless power transmission and on-board measurements verify that the harvested energy can be maximized by using the minimum SNR at the information decoding branch at the expense of DC power consumption required for the biasing of the varactor diodes.

  13. Assessment of infrastructure development requirements for embarking on nuclear power program in Macedonia

    International Nuclear Information System (INIS)

    Popov, N.; Ilijovski, I.; Popovski, V.

    2015-01-01

    Over the past decades nuclear energy has been proven as reliable and economical energy supply that is capable of meeting demanding energy market requirements. Many countries around the world consider entering into new nuclear energy programs and building new power reactors for satisfying their increasing electrical energy needs. A nuclear power program is a major undertaking requiring careful planning, preparation and investment, and human resources for building adequate nuclear infrastructure. Preparations for making a decision to enter into a new nuclear energy program requires a significant amount of financial and human resources, time, and assistance from already developed countries and international nuclear organizations. The International Atomic Energy Agency (IAEA) from Vienna provides technical help, financial assistance, and documented knowledge that are important for countries facing the challenge of entering nuclear programs for the first time. The IAEA organizes technical courses and information exchange meetings for new countries at which experiences and lessons learned are provided to new countries. This paper describes the key activities in the process for making a decision to enter a new nuclear energy program. It describes the efforts currently being conducted in the Republic of Macedonia in the direction of collecting information, performing various feasibility studies, and engaging in regional cooperation for utilizing experiences of the regional countries in performing such activities, and in developing their nuclear power programs. This paper also provides an overview of the IAEA documents and recommendations that are relevant for this topic

  14. Impact of extreme load requirements and quality assurance on nuclear power plant costs

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1993-01-01

    Definitive costs, applicable to nuclear power plant concrete structures, as a function of National Regulatory Requirements, standardization, the effect of extreme load design associated with both design basis accidents and extreme external events and quality assurance are difficult to develop since such effects are interrelated and not only differ widely from country to country, project to project but also vary in time. Table 1 shows an estimate of the of the overall plant cost effects of external event extreme load design on nuclear power plant design for the U.S -and selected foreign countries for which experience with LWRs exist- Germany is the most expensive primarily due to a military aircraft crash resistance. However, the German requirement for 4 safeguards trains rather than 2 and the containment design requirement to consider one Steam Generator blowdown concurrent with a RCS blowdown. This presentation will concentrate on the direct current impact extreme load design and quality assurance have on concrete structures, systems and components for nuclear plants. This presentation is considered timely due to the increased interest in the c potential backfit of Eastern European nuclear power stations of the WWER 440 and WWER 1000 types which typically did not consider the extreme loads identified in Table 1 and accident loads in Table 3 and quality assurance in Table 5 in their original design. Concrete structures in particular are highlighted because they typically form the last barrier to radioactive release from the containment and other Safety Related Structures

  15. Cooling water requirements and nuclear power plants

    International Nuclear Information System (INIS)

    Rao, T.S.

    2010-01-01

    Indian nuclear power programme is poised to scuttle the energy crisis of our time by proposing joint ventures for large power plants. Large fossil/nuclear power plants (NPPs) rely upon water for cooling and are therefore located near coastal areas. The amount of water a power station uses and consumes depends on the cooling technology used. Depending on the cooling technology utilized, per megawatt existing NPPs use and consume more water (by a factor of 1.25) than power stations using other fuel sources. In this context the distinction between 'use' and 'consume' of water is important. All power stations do consume some of the water they use; this is generally lost as evaporation. Cooling systems are basically of two types; Closed cycle and Once-through, of the two systems, the closed cycle uses about 2-3% of the water volumes used by the once-through system. Generally, water used for power plant cooling is chemically altered for purposes of extending the useful life of equipment and to ensure efficient operation. The used chemicals effluent will be added to the cooling water discharge. Thus water quality impacts on power plants vary significantly, from one electricity generating technology to another. In light of massive expansion of nuclear power programme there is a need to develop new ecofriendly cooling water technologies. Seawater cooling towers (SCT) could be a viable option for power plants. SCTs can be utilized with the proper selection of materials, coatings and can achieve long service life. Among the concerns raised about the development of a nuclear power industry, the amount of water consumed by nuclear power plants compared with other power stations is of relevance in light of the warming surface seawater temperatures. A 1000 MW power plant uses per day ∼800 ML/MW in once through cooling system; while SCT use 27 ML/MW. With the advent of new marine materials and concrete compositions SCT can be constructed for efficient operation. However, the

  16. Systematic analysis of aircraft separation requirements

    Science.gov (United States)

    Ennis, Rachelle Lea

    2005-12-01

    Minimum separation standards are necessary for safety in the air traffic control system. At the same time, minimum separation standards constrain the flow of air traffic and cause delays that translate to millions of dollars in fuel costs. Two necessary separation standards are defined. Then, practical methods for calculating the minimum required size of these separation standards are presented. First, the protected zone is considered. The protected zone represents a region around a given aircraft that no other aircraft should penetrate for the safety of both aircraft. It defines minimum separation requirements. Three major components of the protected zone and their interplays are identified: a vortex region, a safety buffer region, and a state-uncertainty region. A systematic procedure is devised for the analysis of the state-uncertainty region. In particular, models of trajectory controls are developed that can be used to represent different modes of pilot and/or autopilot controls, such as path feedback and non-path feedback. Composite protected zones under various conditions are estimated, and effective ways to reduce sizes of protected zones for advanced air traffic management are examined. In order to maintain minimum separation standards between two aircraft, proper avoidance maneuvers must be initiated before their relative separation reaches the minimum separation due to aircraft dynamics, controller and pilot response delays, etc. The concept of the required action threshold is presented. It is defined as the advanced time for which the conflict resolution process must begin in order to maintain minimum separation requirements. Five main segments in the process of conflict resolution are identified, discussed, and modeled: state information acquisition, comprehension and decision, communication, pilot response, and aircraft maneuver. Each of the five segments is modeled via a time constant. Time estimates for the first four segments are obtained from

  17. Regulatory requirements for nuclear power plant site selection in Malaysia-a review.

    Science.gov (United States)

    Basri, N A; Hashim, S; Ramli, A T; Bradley, D A; Hamzah, K

    2016-12-01

    Malaysia has initiated a range of pre-project activities in preparation for its planned nuclear power programme. Clearly one of the first steps is the selection of sites that are deemed suitable for the construction and operation of a nuclear power plant. Here we outline the Malaysian regulatory requirements for nuclear power plant site selection, emphasizing details of the selection procedures and site characteristics needed, with a clear focus on radiation safety and radiation protection in respect of the site surroundings. The Malaysia Atomic Energy Licensing Board (AELB) site selection guidelines are in accord with those provided in International Atomic Energy Agency (IAEA) and United Stated Nuclear Regulatory Commission (USNRC) documents. To enhance the suitability criteria during selection, as well as to assist in the final decision making process, possible assessments using the site selection characteristics and information are proposed.

  18. A SDP based design of relay precoding for the power minimization of MIMO AF-relay networks

    KAUST Repository

    Rao, Anlei

    2015-09-11

    Relay precoding for multiple-input and multiple-output (MIMO) relay networks has been approached by either optimizing the efficiency performance with given power consumption constraints or minimizing the power consumption with quality-of-service (QoS) requirements. For the later type design, previous works has worked on minimizing the approximated power consumption. In this paper, exact power consumption for all relays is derived into a quadratic form by diagonalizing the minimum-square error (MSE) matrix, and the relay precoding matrix is designed by optimizing this quadratic form with the help of semidefinite programming (SDP) relaxation. Our simulation results show that such a design can achieve a gain of around 3 dB against the previous design, which optimized the approximated power consumption. © 2015 IEEE.

  19. TOTEM a computer program for the simulation of an electric power generation system

    International Nuclear Information System (INIS)

    Conti, F.; Graziani, G.

    1976-03-01

    The code TOTEM was written to deduce, from the electrical energy requirements, the power to be installed in order to satisfy that demand. Calculation is not straightforward, as the energy is distributed in time according to a given load duration curve, as the station's utilization is function of its age and because a minimum power reserve has to be provided. In TOTEM the splitting of the total energy production between various types of station is assumed to be given (with the exception of an option, where a certain degree of freedom is left to the fast breeders in order to make full use of the available Plutonium). It evaluates the installation policy, fuel consumption and production, separative work, fabrication and reprocessing capacity requirements, expenditures and capital investments consequent to any given production patterns

  20. The graph-theoretic minimum energy path problem for ionic conduction

    Directory of Open Access Journals (Sweden)

    Ippei Kishida

    2015-10-01

    Full Text Available A new computational method was developed to analyze the ionic conduction mechanism in crystals through graph theory. The graph was organized into nodes, which represent the crystal structures modeled by ionic site occupation, and edges, which represent structure transitions via ionic jumps. We proposed a minimum energy path problem, which is similar to the shortest path problem. An effective algorithm to solve the problem was established. Since our method does not use randomized algorithm and time parameters, the computational cost to analyze conduction paths and a migration energy is very low. The power of the method was verified by applying it to α-AgI and the ionic conduction mechanism in α-AgI was revealed. The analysis using single point calculations found the minimum energy path for long-distance ionic conduction, which consists of 12 steps of ionic jumps in a unit cell. From the results, the detailed theoretical migration energy was calculated as 0.11 eV by geometry optimization and nudged elastic band method. Our method can refine candidates for possible jumps in crystals and it can be adapted to other computational methods, such as the nudged elastic band method. We expect that our method will be a powerful tool for analyzing ionic conduction mechanisms, even for large complex crystals.

  1. Facing the facts: the suspension of a design requirement applicable to nuclear power reactor effluents

    International Nuclear Information System (INIS)

    Amado, Valeria; Biaggio, Alfredo; Canoba, Analia; Curti, Adriana

    2008-01-01

    A design requirement aimed at limiting the discharge of globally dispersed long-lived radionuclides released by nuclear power reactors was in force in Argentine since 1979 till recently. The practical results of such regulatory measure was the need to retain C-14 in the PHWR under construction, as well as in furniture heavy water reactors to be built in the country. This paper explains the basis of such requirement, which was formulated as a collective dose constraint per unit of energy generated, and the main assumptions that triggered it. The differences between the assumptions made at the time and the reality of nuclear power generation at the beginning of the 21 st century, as well as their implications in relation to the requirement are described, including the Suess effect and its impact in the total dose due to C-14. Finally, the facts that made no longer reasonable to keep in force the above mentioned requirement are presented. (author)

  2. A study for the establishment of regulatory requirement and evaluation guide for station blackout in nuclear power plants

    International Nuclear Information System (INIS)

    Lim, J. H.; Koo, C. S.; Joo, W. P.; Oh, S. H.; Shin, W. K.

    1999-01-01

    The consequence of SBO event could be a severe accident unless AC power was restored within a proper time, because many safety systems depend upon AC power. Based on the severity, the SBO has been extensively studied since it was identified as Unresolved Safety Issue at USNRC. The resolution of those studies is a rule-making such as 10 CFR 50.63 and Regulatory Guide 1.155. But there is no regulatory requirements of SBO for an operating domestic nuclear power plant up to the present time. This tudy has established SBO rule(regulatory requirements and evaluation guides) for an operating PWR type of the operating nuclear power plants in Korea

  3. Engineering aspects of a thermal control subsystem for the 25 kW power module

    Science.gov (United States)

    Schroeder, P. E.

    1979-01-01

    The paper presents the key trade study results, analysis results, and the recommended thermal control approach for the 25 kW power module defined by NASA. Power conversion inefficiencies and component heat dissipation results in a minimum heat rejection requirement of 9 kW to maintain the power module equipment at desired temperature levels. Additionally, some cooling capacity should be provided for user payloads in the sortie and free-flying modes. The baseline thermal control subsystem includes a dual-loop-pumped Freon-21 coolant with the heat rejected from deployable existing orbiter radiators. Thermal analysis included an assessment of spacecraft orientations, radiator shapes and locations, and comparison of hybrid heat pipe and all liquid panels.

  4. Minimum DNBR Prediction Using Artificial Intelligence

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dong Su; Kim, Ju Hyun; Na, Man Gyun [Chosun University, Gwangju (Korea, Republic of)

    2011-05-15

    The minimum DNBR (MDNBR) for prevention of the boiling crisis and the fuel clad melting is very important factor that should be consistently monitored in safety aspects. Artificial intelligence methods have been extensively and successfully applied to nonlinear function approximation such as the problem in question for predicting DNBR values. In this paper, support vector regression (SVR) model and fuzzy neural network (FNN) model are developed to predict the MDNBR using a number of measured signals from the reactor coolant system. Also, two models are trained using a training data set and verified against test data set, which does not include training data. The proposed MDNBR estimation algorithms were verified by using nuclear and thermal data acquired from many numerical simulations of the Yonggwang Nuclear Power Plant Unit 3 (YGN-3)

  5. Ergonomic requirements on computer-based information- and handling engineering in nuclear power plants

    International Nuclear Information System (INIS)

    Fassmann, W.

    2002-01-01

    This project provides regulatory authorities with a set of criteria for evaluating hybrid man-machine interfaces in nuclear power plant control rooms from a human factors point of view. Such standards are necessary for two reasons: (1) More and more computerised information and control systems have been and will be introduced in nuclear power plant control rooms. One possible result of this trend will be the creation of hybrid man machine interfaces which will provide both conventional and computer-based display and control devices. (2) Available rules and regulations do not contain detailed requirements on how to integrate both types of interface in such a way that plant operation by means of hybrid interfaces will be performed at least as reliably and safely as by means of conventional ones. To fill this gap, criteria and methods were developed which support practical checks of requirements to be applied to hybrid control rooms. This approach is based on state of the art methods and criteria in ergonomics. It makes it possible to analyse and to describe personnel's actions in a consistent and structured way in order to provide the information which is necessary for evaluating human reliability of task performance. Reliability can be evaluated with respect to - accuracy of required information on displays, - networking of tasks, - possibilities of interrupting and cancelling measures which have already been initiated, - possibility to carry out required manuel actions, - level of mental work-strain, - workload level, - probability of erroneous actions. This method is part of a catalogue of recommendations for evaluating hybrid nuclear power plant control rooms. The catalogue also contains recommendations for the design of computerised parts of the man-machine-interface. Application of these design recommendations will help create favourable conditions for an acceptable level of work-strain and for reliable task performance. (orig.) [de

  6. Minimum income protection in the Netherlands

    NARCIS (Netherlands)

    van Peijpe, T.

    2009-01-01

    This article offers an overview of the Dutch legal system of minimum income protection through collective bargaining, social security, and statutory minimum wages. In addition to collective agreements, the Dutch statutory minimum wage offers income protection to a small number of workers. Its

  7. Determination of Power Required through Accelerated Flight with Application to Unmanned Vehicles

    Science.gov (United States)

    Soltmann, Lars Michael

    Power required analysis is an important element of aircraft performance. The primary method for measuring this parameter is the classic PIW-VIW (power and velocity independent of weight) method which was developed in the first half of the 20th century. This method was originally developed for use with manned aircraft and therefore has some shortcomings when applied to unmanned aircraft, specifically those that are remotely piloted. The proposed method estimates the lift and drag models using the maximum likelihood technique which was applied to data acquired through acceleration and deceleration runs under the assumption that the pitch rate and lateral dynamics are negligible. The acceleration runs were performed by applying full throttle while the aircraft was flying just above the stall velocity and allowing it to naturally accelerate to maximum level flight velocity. The deceleration runs were performed in the opposite manner where the throttle was set to zero while the aircraft was ying at maximum velocity and allowed to naturally slow down until stall was reached. The collected data is reduced using the PIW-VIW technique whereby a single power curve is generated that is independent of aircraft weight and air density. Simulations indicate that deviations from the designed maneuvers, such as altitude changes and low pitch rates, are acceptable and do not change the resulting power curves. A hard limit on what constitutes low pitch rate was difficult to establish as system noise played a large role in determining the signal-to-noise ratio limit on the pitch rate. However, based on a model analysis it was concluded that the pitch rate could be safely ignored without consequences to the results. A low cost Raspberry Pi data collection system was designed for use on two test aircraft, the commercially available Nexstar and a reconfigurable research aircraft called Astraeus. Data points using the classic PIW-VIW method were collected during the flight test program

  8. Environmental requirements at hydroelectric power plants

    International Nuclear Information System (INIS)

    Cada, G.F.

    1993-01-01

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour

  9. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Design Requirements Document (DRD)

    Science.gov (United States)

    Rigo, H. S.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Bents, D. J.; Hatch, A. M.

    1981-01-01

    A description and the design requirements for the 200 MWe (nominal) net output MHD Engineering Test Facility (ETF) Conceptual Design, are presented. Performance requirements for the plant are identified and process conditions are indicated at interface stations between the major systems comprising the plant. Also included are the description, functions, interfaces and requirements for each of these major systems. The lastest information (1980-1981) from the MHD technology program are integrated with elements of a conventional steam electric power generating plant.

  10. 40 CFR 146.13 - Operating, monitoring and reporting requirements.

    Science.gov (United States)

    2010-07-01

    ...) Monitoring requirements. Monitoring requirements shall, at a minimum, include: (1) The analysis of the... minimum, include: (1) Quarterly reports to the Director on: (i) The physical, chemical and other relevant... in the first aquifer overlying the confining zone. When such a well is installed, the owner or...

  11. Optimization Criteria of Power Transformer Operation

    Directory of Open Access Journals (Sweden)

    A. A. Gonchar

    2006-01-01

    Full Text Available It has been shown that minimum losses in active power of a power transformer do not correspond to its maximum efficiency. For a transformer being operated there are no so called «zones of its economical operation». In this case strictly specified value of active power losses corresponds to a particular current of the winding.

  12. Statement on safety requirements concerning the long-term operation of the Muehleberg nuclear power station

    International Nuclear Information System (INIS)

    2012-12-01

    This report published by the Swiss Federal Nuclear Safety Inspectorate ENSI investigates the safety requirements with respect to the long-term operation of the Muehleberg nuclear power station in Switzerland. Relevant international requirements and Swiss legal stipulations concerning the long-term operation of the power station are stated. The management of aging processes is looked at. The regular verification of the integrity of various plant components such as containments, piping, steam generation system, etc. is looked at in detail. The state-of-the-art concerning deterministic accident analyses and refitting technology are discussed, as are automated safety systems. The applicable laws, decrees and guidelines are listed in appendices

  13. Technical evaluation of RETS-required reports for Kewaunee Nuclear Power Plant for 1983

    International Nuclear Information System (INIS)

    Magleby, E.H.; Young, T.E.

    1985-01-01

    A review of the reports required by Federal regulations and the plant-specific Radiological Effluent Technical Specifications (RETS) for operations conducted at the Kewaunee Nuclear Power Plant during 1983 was performed. The periodic reports reviewed were the two Semiannual Effluent Release Reports for 1983 and the annual Kewaunee Environmental Radioactivity Survey. The principal review guidelines were the plant's specific RETS and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  14. Improvement of uranium production efficiency to meet China's nuclear power requirements

    International Nuclear Information System (INIS)

    Zhang, R.

    1997-01-01

    Recently China put the Qinshan Nuclear Power Plant, with an installed capacity of 300 MW, in the province of Zhejiang and the Daya Bay Nuclear Power Plant, with a total installed capacity of 2 x 900 MW, in commercial operation. China plans a rapid growth in nuclear power from 1995 to 2010. China's uranium production will therefore also enter a new period with nuclear power increasing. In order to meet the demand of nuclear power for uranium special attention has been paid to both technical progress improvement using management with the aim of reducing the cost of uranium production. The application of the trackless mining technique has enhanced the uranium mining productivity significantly. China has produced a radiometric sorter, model 5421-2 for pre-concentrating uranium run-of-mine ore. This effectively increases the uranium content in mill feed and decreases the operating cost of hydrometallurgical treatment. The in situ leach technique after blasting is applied underground in the Lantian Mine, in addition to the surface heap leaching, and has obtained a perfect result. The concentrated acid-curing, and ferric sulphate trickle leaching process, will soon be used in commercial operation for treating uranium ore grading -5 to -7 mm in size. The annual production capability of the Yining Mine will be extended to 100 tonnes U using improving in situ leaching technology. For the purpose of improving the uranium production efficiency much work has been done optimizing the distribution of production centres. China plans to expand its uranium production to meet the uranium requirements of the developing nuclear power plants. (author). 4 tabs

  15. Researching the Minimum Wage: A Moral Economy for the Classroom.

    Science.gov (United States)

    Neverow-Turk, Vara

    1991-01-01

    Describes a writing assignment that requires students to research and report on what it would be like to live on minimum wage. Explains that this assignment is not really any different than the traditional assignment, it is simply more obvious about its political content because it involves an inquiry into economics rather than literature or…

  16. 25 CFR 12.31 - Are there any minimum employment standards for Indian country law enforcement personnel?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Are there any minimum employment standards for Indian country law enforcement personnel? 12.31 Section 12.31 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAW AND ORDER INDIAN COUNTRY LAW ENFORCEMENT Qualifications and Training Requirements § 12.31 Are there any minimum employment standards...

  17. Safety of Nuclear Power Plants: Design. Specific Safety Requirements (Spanish Edition); Seguridad de las centrales nucleares: Diseno. Requisitos de seguridad especificos

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-04-15

    This publication is a revision of Safety Requirements No. NS-R-1, Safety of Nuclear Power Plants: Design. It establishes requirements applicable to the design of nuclear power plants and elaborates on the safety objective, safety principles and concepts that provide the basis for deriving the safety requirements that must be met for the design of a nuclear power plant. It will be useful for organizations involved in the design, manufacture, construction, modification, maintenance, operation and decommissioning of nuclear power plants, as well as for regulatory bodies. Contents: 1. Introduction; 2. Applying the safety principles and concepts; 3. Management of safety in design; 4. Principal technical requirements; 5. General plant design; 6. Design of specific plant systems.

  18. Assessment of patch quality by aphidophagous ladybirds: laboratory study on the minimum density of aphids required for oviposition

    Directory of Open Access Journals (Sweden)

    B. C. Das

    2011-12-01

    Full Text Available Many studies indicate that there is a density of aphids below which ladybirds are unlikely to lay eggs. This is adaptive as theory indicates that a certain minimum population density of aphids is required if hatchling larvae are to survive. The responses of gravid females of the two spot ladybird, Adalia bipunctata (L. (Coleoptera: Coccinellidae, recorded over a period of an hour, to colonies of 5 and 50 pea aphids on bean plants and similar plants each previously infested with the same number of aphids for 48 hours were determined. Proportionally more of the ladybirds on plants with 50 aphids or that were previously infested with the same number of aphids for 48 hours laid eggs and larger clusters of eggs, and were less active than those on plants that were infested with or had previously been infested with five aphids. That is, gravid females showed similar oviposition and activity responses to aphid abundance and different levels of honeydew contamination. This indicates that honeydew contamination may be an important cue used by ladybirds when locating and assessing the abundance of prey in aphid colonies.

  19. Analysis of station blackout accident at the nuclear power plant; Analiza gubitka svih izmjenichnih izvora napajanja u NE

    Energy Technology Data Exchange (ETDEWEB)

    Bencik, V [Elektrotehnichki Inst. Rade Koncar, Zagreb (Yugoslavia); Kozaric, M [Zagreb Univ. (Yugoslavia). Elektrotehnicki Fakultet

    1990-07-01

    In 1986 the US NRC published a proposed rule making to tighten the requirements on nuclear plants with regard to their ability to deal safely with a total loss of all a-c electric power, both from external and internal sources of supply. The proposed rule would require all licensees and applicants to: 1. Assess the capability of their plants to cope with a total loss all a-c power(that is, determine the amount of time the plant could maintain core cooling and containment integrity with a-c power unavailable); 2. Have procedures and training to cope with such an event; 3. Make modification, if necessary, to cope with an acceptable minimum duration loss of all a-c power. A total loss of all a-c electric power has been identified as an 'unresolved safety issue' and subjected to considerably study. The article presents an idea to resolve this issue. (author)

  20. Ultra-Low Carbon Emissions from Coal-Fired Power Plants through Bio-Oil Co-Firing and Biochar Sequestration.

    Science.gov (United States)

    Dang, Qi; Mba Wright, Mark; Brown, Robert C

    2015-12-15

    This study investigates a novel strategy of reducing carbon emissions from coal-fired power plants through co-firing bio-oil and sequestering biochar in agricultural lands. The heavy end fraction of bio-oil recovered from corn stover fast pyrolysis is blended and co-fired with bituminous coal to form a bio-oil co-firing fuel (BCF). Life-cycle greenhouse gas (GHG) emissions per kWh electricity produced vary from 1.02 to 0.26 kg CO2-eq among different cases, with BCF heavy end fractions ranging from 10% to 60%, which corresponds to a GHG emissions reduction of 2.9% to 74.9% compared with that from traditional bituminous coal power plants. We found a heavy end fraction between 34.8% and 37.3% is required to meet the Clean Power Plan's emission regulation for new coal-fired power plants. The minimum electricity selling prices are predicted to increase from 8.8 to 14.9 cents/kWh, with heavy end fractions ranging from 30% to 60%. A minimum carbon price of $67.4 ± 13 per metric ton of CO2-eq was estimated to make BCF power commercially viable for the base case. These results suggest that BCF co-firing is an attractive pathway for clean power generation in existing power plants with a potential for significant reductions in carbon emissions.