WorldWideScience

Sample records for micro-hydro power development

  1. An Overview of Power Topologies for Micro-hydro Turbines

    DEFF Research Database (Denmark)

    Nababan, Sabar; Muljadi, E.; Blaabjerg, Frede

    2012-01-01

    This paper is an overview of different power topologies of micro-hydro turbines. The size of micro-hydro turbine is typically under 100kW. Conventional topologies of micro-hydro power are stand-alone operation used in rural electrical network in developing countries. Recently, many of micro-hydro...... power generations are connected to the distribution network through power electronics (PE). This turbines are operated in variable frequency operation to improve efficiency of micro-hydro power generation, improve the power quality, and ride through capability of the generation. In this paper our...... discussion is limited to the distributed generation. Like many other renewable energy sources, the objectives of micro-hydro power generation are to reduce the use of fossil fuel, to improve the reliability of the distribution system (grid), and to reduce the transmission losses. The overview described...

  2. Innovative private micro-hydro power development in Rwanda

    International Nuclear Information System (INIS)

    Pigaht, Maurice; Plas, Robert J. van der

    2009-01-01

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (i) institutional arrangements rather than technical quality determine the success of such projects; (ii) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (iii) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too.

  3. Innovative private micro-hydro power development in Rwanda

    Energy Technology Data Exchange (ETDEWEB)

    Pigaht, Maurice; Van der Plas, Robert J. [MARGE-Netherlands, Brem 68, 7577 EW Oldenzaal (Netherlands)

    2009-11-15

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (1) institutional arrangements rather than technical quality determine the success of such projects; (2) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (3) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too. (author)

  4. Hybrid Micro-Hydro Power Generation Development in Endau Rompin National Park Johor, Malaysia

    Directory of Open Access Journals (Sweden)

    Yusop Azli

    2017-01-01

    Full Text Available Micro-Hydro electrical power systems are very useful for remote area electrification which does not had supply from the national grid. On the contrary, this area has river streams with high potential for micro-hydro power generation. As such, the UTHM ECO-Hydro Team embarked on a project for erecting a micro-hydro power plant with collaboration with National Education Research Center (NERC, Johor National Park Corporation in Endau Rompin. The existing power generation in this area at present is by using diesel generator gives negative impact on finance and environment in the long run. It supplies power to several including library, offices, open laboratory, chalets and dorms.. At the moment, the micro-hydro system complements the diesel generator, thus becoming a hybrid power generation system.

  5. Experience of pico/micro hydro based power generation

    Energy Technology Data Exchange (ETDEWEB)

    Murthy, S.S. [Indian Inst. of Technology, Delhi, New Delhi (India). Dept. of Electrical Engineering

    2010-07-01

    Although India has approximately 150,000 megawatts of hydro potential, only a small portion is tapped. There is also significant untapped hydro potential in many developing countries such as Nepal, Bhutan, Vietnam, Indonesia and regions in South America and Africa. Small-scale hydroelectric power systems with capacities of up to a few megawatts are eco-friendly and sustainable. They can be classified based on unit sizes as pico (u pto 10 kilowatts), micro (10-100 kilowatts) and mini (100 kilowatts to a few megawatts) hydro systems. Mini hydro systems are always grid connected while micro can be either grid connected or off grid. Pico is always off grid. In India, there are thousands of favorable sites in this range that should be tapped for distributed power generation to electrify local communities. This need is reflected by the global emphasis on distributed power generation as well as the Government of India's policy to promote this type of power generation. A working stand alone pico-hydro power generating system has been successfully installed in 5 sites in Karnataka. The purpose of the project was to demonstrate the technical, managerial and economic feasibility of setting up small hydro projects in remote hilly areas of Karnataka, India and its positive environmental impact. The presentation discussed the site selection criteria; installed sites of pico hydro; system description; parts of the system; the electric load controller; types of electronic load controllers; and a description of the unit and control scheme. tabs., figs.

  6. Sustainability Challenge of Micro Hydro Power Development in Indonesia

    Science.gov (United States)

    Didik, H.; Bambang, P. N.; Asep, S.; Purwanto, Y. A.

    2018-05-01

    Rural electrification using renewable energy is the best choice for many locations that far away from national grid. Many renewable energy project have been built for rural electrification such as micro hydro power plant (MHPP) and solar photovoltaic (SPV). Sustainability still the main challenge of off-grid renewable energy development for off-grid rural electrification in Indonesia. The objective of this paper is to review sustainability of micro hydro power development in Indonesia. The research method was done by field observation, interview with MHPP management, and reviewing some research about MHPP in Indonesia. Sustainability issues include various aspects that can be classified into 5 dimensions: technical, economic, socio-cultural, institutional, and environmental. In technical factors that lead to sustainability problem are: improper MHPP design and construction, improper operation and maintenance, availability of spare parts and expertise. In the economic dimension are generally related to: low electricity tariff and utilization of MHPP for productive use. In the social dimension are: the growth of consumer’s load exceeding the capacity, reduced number of consumers, lack of external institutional support. In the institutional side, it is generally related to the ability of human resources in managing, operating and maintaining of MHPP. Environmental factors that lead the sustainability problems of MHPP are: scarcity of water discharge, conflict of water resources, land conversion over the watershed, and natural disasters.

  7. Micro-hydro power: reviewing an old concept

    Energy Technology Data Exchange (ETDEWEB)

    Alward, R.; Eisenbart, S.; Volkman, J.

    1979-01-01

    This informaion package has been prepared to respond to an increasing number of requests for information on micro-hydro systems. It contains a resource directory, which is an attempt to put the reader in contact with the literature, plans, people, and companies appropriate to needs. On a world-wide basis, small-scale, environmentally benign, mechanical, and electrical hydropower systems are common. These are the systems for individual homes, farm, and shop use and generally have power outputs less than 100 kW. For convenience in terminology, this scale of hydro power is referred to as micro-hydro. A decision tree is first presented followed by information on determining the suitability of th site, equipment, economics, sources for financial assistance, regulatory conflicts, cautions and suggestions for the Do-It-Yourselfer, and the Self-Installer, manufacturers and suppliers, and sources of professional services. An annotated bibliography of 16 references is provided. (MCW)

  8. Distributed power in Afghanistan: The Padisaw micro-hydro project

    International Nuclear Information System (INIS)

    Hallett, Michael

    2009-01-01

    The provision of electricity is a vital need in reconstruction and development situations, like that in Afghanistan. Indeed, according to the Afghan government's Afghan National Development Strategy (ANDS) the need for electricity featured in 80% of the Provincial Development Plans as a top priority. With the help of the International Community, the government of Afghanistan is attempting to develop a new market oriented approach to the nationwide provision of electrical power. Although the bulk of the electrification effort is directed toward large scale construction of a national grid, the ANDS explicitly mentions a role for 'micro-hydro, solar, waste and small scale diesel power and energy generating sources'. This article will describe a micro-hydro project in Padisaw village, in the Nurgaram district of Nuristan province located in Northeastern Afghanistan and the role Provincial Reconstruction Team played in working with the local community through the project planning and building processes and offer some observation on how, as the Afghan National Development Strategy is executed, the private sector can play an increasingly significant role in the Afghan distributed energy arena. (author)

  9. Remote micro hydro

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    The micro-hydro project, built on a small tributary of Cowley Creek, near Whitehorse, Yukon, is an important step in the development of alternative energy sources and in conserving expensive diesel fuel. In addition to demonstrating the technical aspects of harnessing water power, the project paved the way for easier regulatory procedures. The power will be generated by a 9 meter head and a 6 inch crossflow turbine. The 36 V DC power will be stored in three 12 V batteries and converted to ac on demand by a 3,800 watt inverter. The system will produce 1.6 kW or 14,016 kWh per year with a firm flow of 1.26 cfs. This is sufficient to supply electricity for household needs and a wood working shop. The project is expected to cost about $18,000 and is more economical than tying into the present grid system, or continuing to use a gasoline generator. An environmental study determined that any impact of the project on the stream would be negligible. It is expected that no other water users will be affected by the project. This pilot project in micro-hydro applications will serve as a good indicator of the viability of this form of alternate energy in the Yukon. The calculations comparing the micro-hydro and grid system indicate that the mico-hydro system is a viable source of inflation-proof power. Higher heads and larger flow resulting in ac generation in excess of 10 kW would yield much better returns than this project. 3 tabs.

  10. Micro-hydro power in the UK: The role of communities in an emerging energy resource

    International Nuclear Information System (INIS)

    Bracken, L.J.; Bulkeley, H.A.; Maynard, C.M.

    2014-01-01

    Research around micro-hydro power is focused on technical aspects with limited understanding of the social organisation and environmental implications. We examine the ways in which micro-hydro is engaged by people and organisations as a means of contributing to the UK's policy ambition for renewable energy. We bring to the fore the way in which expertise is used and contested. A web based review of micro-hydro schemes in the UK was undertaken and a detailed evaluation of two schemes in the North of England was conducted to determine how expertise and contestation figures in community schemes. Results demonstrate a rapid expansion of micro-hydro in the UK. Ownership/control is highly ‘community based’. Until now research around micro-hydro has been dominated by technical approaches with schemes defined in terms of hardware. We propose a third dimension to Walker and Cass's (2007) classification of renewable energy developments: the environmental dimension. We suggest this dimension of micro-hydro is critical, both in terms of the extent to which resources can be realised but also the ways in which it might attract controversy, in particular around how expertise is used and valued. - Highlights: • Analysis of micro-hydro schemes in the UK demonstrates a recent rapid expansion. • We propose a third dimension to renewable energy developments: the environmental dimension. • The environmental dimension of micro-hydro determines how resources are realised. • Environmental features underpin the controversy which can emerge around schemes. • The ownership of micro-hydro schemes is highly ‘community based’

  11. Potency of Micro Hydro Power Plant Development Use of Kelampuak River Flow Located in Tamblang Village – Buleleng

    Directory of Open Access Journals (Sweden)

    Dewa Ngakan Ketut Putra Negara

    2012-11-01

    Full Text Available Need of electrical energy is increasing along with people population and economic growth. According to PLN data, Bali Province’s electrical consumption is predicted growth 5,6% in average every year. Until year 2007, electrical condition in Bali is categorized critical. If Power Plat in Bali, PLTG Gilimanuk that has power 130 MW is out of system, affecting Bali’s electrical back up is minus. Consecuenlly, it will be extinguishing if there is not adding power plan or new energy supply. This problem needs to be anticipated by use of thermal energy program such as coal, gas and geothermal and use of alternative energy such as solar, wind and ocean energies. Regency of Buleleng is one of Regency in Bali having potency of renewable energy development especially water resource. It has some rivers that have potency to be developed as a Micro Hydro Power Plant (PLTMH. One of them is Kelampuak River which is located in Tamblang Village. As a first step in developing of Micro Hydro Power Plant, it needs to be known water debit and head of the river. For that reason, it needs to be investigated debit and head of Kelampuak River so that it can be predicted the power can be generated.

  12. Survey, design, development, and installation of micro hydel power generation

    International Nuclear Information System (INIS)

    Ijaz, M.

    2011-01-01

    This paper presents the survey, design, development and installation Of micro hydel power generation using low head Kaplan water turbine. Electricity production from hydro power has been and still is today, the first renewable source used to generate electricity. The development of energy from renewable is very important step in reduction of carbon emissions(CO/sub 2/).

  13. Theoretical and conditional monitoring of a small three-bladed vertical-axis micro-hydro turbine

    International Nuclear Information System (INIS)

    Huang, Sy-Ruen; Ma, Yen-Huai; Chen, Chia-Fu; Seki, Kazuichi; Aso, Toshiyuki

    2014-01-01

    Highlights: • This paper presents a novel 3 three-bladed vertical-axis micro-hydro turbine system. • This paper presents structure and performance of micro-hydroelectric turbine system. • The paper reveal that using VAMHT system in water is distinct from using in wind. • This paper present an experimental results of VAMHT system. • The paper show that the status transformation from cut-into stable power generation is short. - Abstract: This paper presents a novel 3-kW three-bladed vertical-axis micro-hydro turbine (VAMHT) system. The experimental results reveal that using this type of turbine in water is distinct from using it in wind. The micro-hydro turbine system uses a three-phase permanent magnet symmetric generator that transforms mechanical energy into electrical energy. The output voltage and frequency of the generator depend on water flow speed, and voltage steady equipment is used to maintain the maximum output power of the DC bus. According to the maximum power point tracking of the micro-hydro turbine system, the condition monitoring of the novel micro-hydro turbine requires no water flow meter. Furthermore, the construction and installation of the new micro-hydro turbine is simple, economical, and stable. This system combines a micro-hydro generator and electrical state-monitoring system, which can measure the speed, output power, DC-bus voltage, and all electrical characteristics of the micro-hydro turbine system. The results of comparing turbine between wind and water show that the speed ranges of water flow is narrower than that of wind, and the status transformation from cut-into stable power generation is short

  14. Hydro power plants, an overview of the current types and technology

    Directory of Open Access Journals (Sweden)

    Tkáč Štefan

    2018-03-01

    Full Text Available Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  15. Hydro power plants, an overview of the current types and technology

    Science.gov (United States)

    Tkáč, Štefan

    2018-03-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  16. Developing teaching kit on the use of micro-hydro generator in remote area

    Directory of Open Access Journals (Sweden)

    Desak Made Megawati

    2017-04-01

    Full Text Available The study aimed at: (1 identifying the criteria of teaching kit feasibility for the advantages of micro-hydro generator in remote area; and (2 identifying the effectiveness of teaching kit implementation on the use of micro-hydro generator in remote area in order to improve the students’ concept mastery on SMP Negeri 1 Rampi South Sulawesi. The study was a research and development that adapted the 4D model, which consisted of define, design, develop, and disseminate. The teaching kit that had been developed was a syllabus, lesson plans, student’s worksheet, and assessment instrument. For the data gathering, the researcher implemented the non-test technique, in the form of product validation sheet, student’s worksheet readability questionnaire sheet, teaching implementation sheet, and test technique, in the form of concept mastery test item sheet. The results of the study show that: (1 the teaching kit on the use of micro-hydro generator in remote area that has been developed falls into the “Very Good” category for syllabus, lesson plan, and student’s worksheet; and (2 the implementation of the teaching kit on the use of micro-hydro generator in remote area has been effective to improve the students’ concept mastery in SMP Negeri 1 Rampi South Sulawesi.

  17. Global analysis of a renewable micro hydro power generation plant

    Science.gov (United States)

    Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul

    2017-12-01

    Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.

  18. Rural electrification in Indonesia : the role of micro hydro power in shaping forest conservation behavior

    NARCIS (Netherlands)

    I Wayan Gede Santika, W.; Midden, C.J.H.; Lemmens, A.M.C.

    2009-01-01

    It is reported that villagers at the villages electrified by micro hydro power (MHP) show more favorable attitudes, intentions, and behaviors toward forest conservation. They initiated a community-based agreement regulating forest cutting, reduced trees chopped from the forests, reduced intention

  19. Current status and future developments of small and micro hydro in southern Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2012-05-01

    Full Text Available -1 Current status and future developments of small and micro hydro in southern Africa Wim Jonker Klunne Council for Scientific and Industrial Research (CSIR) PO Box 395 Pretoria 0001 South Africa Introduction Small and micro hydropower... are renewable energy technologies that have large potential in the south- ern African region, both for grid and off-grid applications. Within the region a good understanding exists on the potential for large scale hydro with a substantial number of plants...

  20. Micro Hydro-Electric Energy Generation- An Overview

    OpenAIRE

    S. O. Anaza; M. S. Abdulazeez; Y. A. Yisah; Y. O. Yusuf; B. U. Salawu; S. U. Momoh

    2017-01-01

    Energy is required now more than ever due to population growth, industrialization and modernization. Challenges such as carbon dioxide (CO2) emissions and depletion of conventional source of energy necessitate for renewable sources, of which hydro energy seems to be the most predictable. Micro-hydro which is hydro energy in a “small” scale provides electricity to small communities by converting hydro energy into electrical energy. This paper is an overview of micro-hydro system by reviewing s...

  1. Replacement power supply with micro-hydropower. Case micro central - Pipinta

    International Nuclear Information System (INIS)

    Gomez, Jorge I; Hincapie, Luis A; Woodcock, Edgar; Arregoces Alvaro

    2006-01-01

    This paper describes the Micro-Hydro Electric Pipinta through its main components and their parameters. An evaluation of the actual power plant costs and a proposed redesign are also given with prices referenced to year 2004. A comparison between the electricity price supplied by the grid and the cost for the electricity in this Micro-Hydro Power Plant let conclude that projects of this type are available in rural areas of Colombia reached by the grid.

  2. The micro hydraulic power, a sure value

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    The micro hydroelectricity is a proven technology which has now reached maturity. Ideal for electrification of remote sites, it also serves a complement to national electric production. A recent study carried out by the ESHA estimates the potential which still available in terms of micro hydraulic power plants at 5939 MW. The small hydro power capacity (>10 MW) installed in European union and the available potential of small hydro power are presented. (A.L.B.)

  3. Strategies for growth of hydro electric power

    International Nuclear Information System (INIS)

    Khera, D.V.

    1998-01-01

    Hydro power on account of its several inherent advantages has a key role to play in the development of long term energy strategies based on diversified and balance use of natural national resources. Our country is fortunate to be endowed with large hydro-electric potential. It is estimated that the hydro potential while fully developed may yield to an installed capacity of 1,50,000 MW. An attempt has been made in this paper to examine and analyse the status and trend of hydro power development, need for accelerated development of hydro power, myths about hydro electric projects, principal causes responsible for scaling down of hydro share in the total installed capacity and strategies which could restore optimum hydro thermal mix. (author)

  4. Analyze the factors effecting the development of hydro power projects in hydro rich regions of India

    Directory of Open Access Journals (Sweden)

    Ameesh Kumar Sharma

    2016-09-01

    Full Text Available Power is considered as the major back bone for all the nations throughout the world including India on the basis of which development of the country depends. If a country has the resources to generate the power at competitive price in that case the people of the country get the benefits in terms of improvement in their social and economical life. When we talk about India, various locations in the country where still there is no electricity people are living in dark without having the access of the modern technology. The total hydro power potential of India is 1, 50,000 MW out of this total hydro potential only 40,195 MW is exploited till 2014. More than 80% of the total hydro potential of the country is lying in the western Himalayan states (Jammu and Kashmir, Himachal Pradesh, Uttrakhand and Arunachal Pradesh. Small hydro projects are also playing a very important role in the modern world for the development of the remote areas which are not main grid connected specially in western Himalayan region of India. India has a total potential 19,749 MW of small hydro projects and of this total potential only 3990.9 MW harnessed till 2014. Ministry of new and renewable energy in India is also providing special incentives to hydro rich states of India. In this research article we are taken the case study of the small hydro projects in the western Himalayan region because theses states are having vast small hydro potential which is still needed to be harnessed. So, it is very important to identify the factors which are effecting the development of these small ventures especially in western Himalayan region in India.

  5. The Environmental Impact Study Of Micro Hydro Power In Pekalongan Indonesia

    Science.gov (United States)

    Suwarto; Hadi, Sudharto P.; Hermawan

    2018-02-01

    Curugmuncar II micro hydro power (MHP) located in Petungkriyono sub district is one of three MHPs installed in Pekalongan district. This study aims to analyze the MHP operation environmental impact. The study used qualitative method, with interviews, observations, and material testing. The data used are primary and secondary data. This research was conducted in Curugmuncar Village, Petungkriyono Subdistrict, Pekalongan Regency, Indonesia. MHP has power capacity of 100 KW with power usage of 50 KW. MHP used by 155 users with load capacity 2 A 220 volt AC. The community more used of lights as the houses and street lighting. The MHP operation had several environmental factors such as: sociology, technically feasible, hydrology, physical and chemical water quality, ergonomics, economically feasible, irrigation, clean water supply, government policy, and others. The supporting factors sustainability of MHP were sociology, irrigation, ergonomics, clean water supply, physical and chemical water quality, hydrology, and government policy. The inhibiting factors of MHP operation were technically feasible, economically feasible, and government policy. The results showed that the MHP environment requires a professional management system to achieve the MHP sustainability

  6. Development of Dalaelven hydro power scheme in Sweden

    International Nuclear Information System (INIS)

    Kokko, Voitto; Hjerthen, Peter; Ingfaelt, Hans; Loewen, Karl-Erik; Sjoegren, Arne

    2015-01-01

    The Dalaelven hydro scheme is located in central Sweden. Fortum has in the scheme 50 dams and 35 hydro power plants producing 4 TWh energy with a capacity of 970 MW. The main reservoirs are Lake Siljan and Traengsletsjoen with Traengslet dam, the highest earth-filled dam in Sweden. Development of the hydro scheme started 1878 with construction of four power plants for industry until 1930. From 1931 to 1974 15 power plants were built for increasing electricity consumption. De-regulation of the energy market in 1990's and EU environmental targets in 2000's resulted in the rehabilitation of ten power plants between 1990 and 2014 with increased annual energy production of 377 GWh (29%) and capacity 124 MW (59%). This energy decreases the annual CO 2 emissions with 125918 tons in comparison to production of the same amount of energy by coal. In several cases the rehabilitation was made in new power houses, allowing the development of the layout and technology of civil structures, and use of state-of-art equipment. Sweden uses the green certificate system, and 235 GWh of the energy received this certificate. Other environmental benefits come from use of the environmentally friendly Kaplan turbines and construction of some new fish pass. There are further plans to increase the spillway capacity of Traengslet dam and to rehabilitate eight power plant units. The possibilities of obtaining the Environmental licences for the rehabilitations has became challenging in the past years and green certificates are nowadays agreed only for increased energy. (authors)

  7. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  8. The Environmental Impact Study Of Micro Hydro Power In Pekalongan Indonesia

    Directory of Open Access Journals (Sweden)

    Suwarto

    2018-01-01

    Full Text Available Curugmuncar II micro hydro power (MHP located in Petungkriyono sub district is one of three MHPs installed in Pekalongan district. This study aims to analyze the MHP operation environmental impact. The study used qualitative method, with interviews, observations, and material testing. The data used are primary and secondary data. This research was conducted in Curugmuncar Village, Petungkriyono Subdistrict, Pekalongan Regency, Indonesia. MHP has power capacity of 100 KW with power usage of 50 KW. MHP used by 155 users with load capacity 2 A 220 volt AC. The community more used of lights as the houses and street lighting. The MHP operation had several environmental factors such as: sociology, technically feasible, hydrology, physical and chemical water quality, ergonomics, economically feasible, irrigation, clean water supply, government policy, and others. The supporting factors sustainability of MHP were sociology, irrigation, ergonomics, clean water supply, physical and chemical water quality, hydrology, and government policy. The inhibiting factors of MHP operation were technically feasible, economically feasible, and government policy. The results showed that the MHP environment requires a professional management system to achieve the MHP sustainability

  9. Hydro-power: a long history, a bright future

    Energy Technology Data Exchange (ETDEWEB)

    Deudney, D

    1981-07-01

    A brief history of the spread of hydro-power in the world was given. Tables showing hydro-power potential and use, and the % electricity from hydro-power for 13 countries were included along with a graph showing % hydro-power operating, planned and under construction by region. The need for committed and farsighted political leadership for future development and the possibility of hydro production reaching 4 to 6 times its present level were discussed.

  10. Hydro and nuclear power for African less-carbon development

    Energy Technology Data Exchange (ETDEWEB)

    El-Gazzar, Mohamed; Ibrahim, Yassin Mohamed; Bedrous, Maher Aziz

    2007-07-01

    Though the overall picture reveal availability of enormous energy resources which far exceed energy requirements of Africa, most of these resources are grossly underutilized, particularly hydro and nuclear resources. It suggests that Africa's problem is not lack of energy resources but its development and utilization. The region will remain a major net exporter of energy for several decades to com. In dealing with its energy problems Africa faces a unique set of initial conditions, defined mainly by its level and pattern of economic growth, social and demographic characteristics, energy resource endowment, location distances between supply sources and consumption areas, technological underdevelopment, and poverty-driven energy-environment conflict. A key challenge is the optimal utilization of the Africa's energy resources to facilitate both individual country and regional energy and economic development. Stronger emphasis on a more integrated energy supply network based on more widespread regional initiatives, particularly in electricity is essential to sustainable energy development in Africa. This paper discusses the prospects for hydro and nuclear power in Africa. The continent is the poorest in the world. The lack of reliable, accessible and affordable energy hinders its development. Hydro and nuclear power promises to be the least-carbon energy sources, while being the cheapest and most reliable among all. The role the hydropower can play in securing a sustainable energy future for Africa is highly emphasized. Also, nuclear power has many advantages to Africa. Opportunities for hydropower and nuclear power in Africa are all considered. Advantages and disadvantages are also all discussed. (auth)

  11. Hydro power plants, an overview of the current types and technology

    OpenAIRE

    Tkáč Štefan

    2018-01-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy...

  12. Assessment of small versus large hydro-power developments - a Norwegian case study

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Tor Haakon; Harby, Atle

    2010-07-01

    Full text: The era of new, large hydro-power development projects seems to be over in Norway. Partly as a response to this, a large number of applications for the development of smallscale hydro power projects up to 10 MW overflow the Water Resources and Energy Directorate, resulting in an extensive development of small tributaries and water courses in Norway. This study has developed a framework for the assessment and comparison of several small versus many large hydro-power projects based on a multi-criteria analysis (MCA) approach, and further tested this approach on planned or developed projects in the Helgeland region, Norway. Multi-criteria analysis is a decision-support tool aimed at providing a systematic approach for the comparison of various alternatives with often non-commensurable and conflicting attributes. At the same time, the technique enables complex problems and various alternatives to be assessed in a transparent and simple way. The MCA-software was in our case equipped with 2 overall criteria (objectives) with a number of sub criteria; Production with sub-criteria like volume of energy production, installed effect, storage capacity and economical profit; Environmental impacts with sub-criteria like fishing interests, biodiversity, protection of unexploited nature The data used in the case study is based on the planned development of Vefsna (large project) with the energy/effect production estimated and the environmental impacts identified as part of the feasibility studies (the project never reached the authorities' licensing system with a formal EIA). The small-scale hydro-power projects used for comparison are based on realized projects in the Helgeland region and a number of proposed projects, up scaled to the size of the proposed Vefsna-development. The results from the study indicate that a large number of small-scale hydro-power projects need to be implemented in order to balance the volume of produced electricity/effect from one

  13. Set-up of a pump as turbine use in micro-pumped hydro energy storage: a case of study in Froyennes Belgium

    Science.gov (United States)

    Morabito, A.; Steimes, J.; Bontems, O.; Zohbi, G. Al; Hendrick, P.

    2017-04-01

    Its maturity makes pumped hydro energy storage (PHES) the most used technology in energy storage. Micro-hydro plants (electricity production such as wind and solar power. This paper presents the design of a micro-PHES developed in Froyennes, Belgium, using a pump as turbine (PaT) coupled with a variable frequency driver (VFD). The methods adopted for the selection of the most suitable pump for pumping and reverse mode are compared and discussed. Controlling and monitoring the PaT performances represent a compulsory design phase in the analysis feasibility of PaT coupled with VFD in micro PHES plant. This study aims at answering technical research aspects of µ-PHES site used with reversible pumps.

  14. Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

    Energy Technology Data Exchange (ETDEWEB)

    Huertas-Hernando, Daniel [Department of Energy Systems, SINTEF, Trondheim Norway; Farahmand, Hossein [Department of Electric Power Engineering, Norwegian University of Science and Technology (NTNU), Trondheim Norway; Holttinen, Hannele [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Kiviluoma, Juha [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Rinne, Erkka [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Söder, Lennart [Department of Electrical Engineering, KTH University, Stockholm Sweden; Milligan, Michael [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Ibanez, Eduardo [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Martínez, Sergio Martín [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Gomez-Lazaro, Emilio [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Estanqueiro, Ana [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Rodrigues, Luis [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Carr, Luis [Research Association for Energy Economics (FfE GmbH), Munich Germany; van Roon, Serafin [Research Association for Energy Economics (FfE GmbH), Munich Germany; Orths, Antje Gesa [Energinet.dk, Fredericia Denmark; Eriksen, Peter Børre [Energinet.dk, Fredericia Denmark; Forcione, Alain [Hydro Quebec, Montréal Canada; Menemenlis, Nickie [Hydro Quebec, Montréal Canada

    2016-06-20

    Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as well as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.

  15. Hydro-power

    International Nuclear Information System (INIS)

    Piro, P.

    2010-01-01

    On average the hydro-power sector produces 12% of the electrical power in France. A quarter of this production might pass to another operator than EDF because the end of some grants is nearing (2012 for 12 installations). In France the power of rivers belongs to the state that gives operators grants to harness it. The allowance lasts 75 years usually but for installations below 4.5 MW a permanent and definitive grant is allowed. Most installations are ancient and their investment have been paid off since a long, so hydro-power is the most profitable renewable energy in France. A lot of bidders are expected. Each bid will be assessed on 3 criteria: -) the global energy efficiency of the waterfall, -) a balanced management of the water resource, and -) an economic and financial offer to the state. The balance between the different uses of water is getting more delicate to reach and this renewal of grants will be an opportunity for the state to impose a better preservation of the environment. In July 2008, the French government announced a program for the re launching of the hydro-power, this program has been reduced and now only 3000 GWh supplementary are expected by 2020. (A.C.)

  16. Conceptual design of planetary gearbox system for constant generator speed in hydro power plant

    Directory of Open Access Journals (Sweden)

    Bhargav

    2018-01-01

    Full Text Available Micro Hydro Power Plant (MHPP is emerging as one of the most clean, renewable and reliable energy technology for harnessing power. In MHPP hydro governors are avoided, that results in turbine speed fluctuation. MHPP requires either speed or torque amplification of generator for constant power generation. To achieve this, planetary gear transmission system is explored for MHPP due to its higher efficiency and compact size. A conceptual planetary gearbox system is developed for MHPP to maintain constant generator speed. The conceptual gearbox is designed, modelled and analysed using ADAMS software. Simulation results are found to be in close agreement with analytical results. Hence, conceptual design of planetary gearbox can be used to govern constant generator speed. In this paper, a MHPP which generate constant power of 5 kW at constant generator speed of 1490 rpm is analysed and validated

  17. Pico hydro power for rural electrification in developing countries

    International Nuclear Information System (INIS)

    Maher, P.; Smith, N.P.A.; Williams, A.A.

    1998-01-01

    Pico hydro power is a renewable energy system which has the potential to provide millions of rural people world-wide with a cheap, sustainable source of electricity. The development of new, cost-reducing approaches, including local manufacture and implementation in developing countries, has increased the accessibility of this technology to large numbers of people. The new approaches are investigated and some of the present constraints to wider adoption of this technology are analysed. (Author)

  18. Power generation by high head water in a building using micro hydro turbine-a greener approach.

    Science.gov (United States)

    M M S R S, Bhargav; V, Ratna Kishore; S P, Anbuudayasankar; K, Balaji

    2016-05-01

    Demand for green energy production is arising all over the world. A lot of emphasis is laid in making the buildings green. Even a small amount of energy savings made contribute to saving the environment. In this study, an idea is proposed and studied to extract power from the high head water in the pipelines of a building. A building of height 15 m is considered for this study. Water flowing in the pipe has sufficient energy to run a micro hydro turbine. The feasibility of producing electrical energy from the energy of pipe water is found. The motivation is to find the feasibility of generating power using a low-cost turbine. The experimental setup consists of micro turbine of 135 mm diameter coupled to a 12-V DC generator; LEDs and resistors are employed to validate the results. The theoretical calculations were presented using the fundamental equations of fluid mechanics. The theoretical results are validated using experimental and numerical results using CFD simulation. In addition, exergy analysis has been carried out to quantify the irreversibilities during the process in the system.

  19. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  20. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  1. Optimal control systems in hydro power plants

    International Nuclear Information System (INIS)

    Babunski, Darko L.

    2012-01-01

    The aim of the research done in this work is focused on obtaining the optimal models of hydro turbine including auxiliary equipment, analysis of governors for hydro power plants and analysis and design of optimal control laws that can be easily applicable in real hydro power plants. The methodology of the research and realization of the set goals consist of the following steps: scope of the models of hydro turbine, and their modification using experimental data; verification of analyzed models and comparison of advantages and disadvantages of analyzed models, with proposal of turbine model for design of control low; analysis of proportional-integral-derivative control with fixed parameters and gain scheduling and nonlinear control; analysis of dynamic characteristics of turbine model including control and comparison of parameters of simulated system with experimental data; design of optimal control of hydro power plant considering proposed cost function and verification of optimal control law with load rejection measured data. The hydro power plant models, including model of power grid are simulated in case of island ing and restoration after breakup and load rejection with consideration of real loading and unloading of hydro power plant. Finally, simulations provide optimal values of control parameters, stability boundaries and results easily applicable to real hydro power plants. (author)

  2. Rainfall prediction using fuzzy inference system for preliminary micro-hydro power plant planning

    Science.gov (United States)

    Suprapty, B.; Malani, R.; Minardi, J.

    2018-04-01

    East Kalimantan is a very rich area with water sources, in the form of river streams that branch to the remote areas. The conditions of natural potency like this become alternative solution for area that has not been reached by the availability of electric energy from State Electricity Company. The river water in selected location (catchment area) which is channelled to the canal, pipeline or penstock can be used to drive the waterwheel or turbine. The amount of power obtained depends on the volume/water discharge and headwater (the effective height between the reservoir and the turbine). The water discharge is strongly influenced by the amount of rainfall. Rainfall is the amount of water falling on the flat surface for a certain period measured, in units of mm3, above the horizontal surface in the absence of evaporation, run-off and infiltration. In this study, the prediction of rainfall is done in the area of East Kalimantan which has 13 watersheds which, in principle, have the potential for the construction of Micro Hydro Power Plant. Rainfall time series data is modelled by using AR (Auto Regressive) Model based on FIS (Fuzzy Inference System). The FIS structure of the training results is then used to predict the next two years rainfall.

  3. Dynamic modeling, simulation and control design of an advanced micro-hydro power plant for distributed generation applications

    Energy Technology Data Exchange (ETDEWEB)

    Marquez, J.L. [Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Molina, M.G. [CONICET, Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Pacas, J.M. [Institut fuer Leistungselektronik und Elektrische Antriebe, Universitaet Siegen, Fachbereich 12 Hoelderlinstr 3, D 57068 Siegen (Germany)

    2010-06-15

    A small-scale hydropower station is usually a run-of-river plant that uses a fixed speed drive with mechanical regulation of the turbine water flow rate for controlling the active power generation. This design enables to reach high efficiency over a wide range of water flows but using a complex operating mechanism, which is in consequence expensive and tend to be more affordable for large systems. This paper proposes an advanced structure of a micro-hydro power plant (MHPP) based on a smaller, lighter, more robust and more efficient higher-speed turbine. The suggested design is much simpler and eliminates all mechanical adjustments through a novel electronic power conditioning system for connection to the electric grid. In this way, it allows obtaining higher reliability and lower cost of the power plant. A full detailed model of the MHPP is derived and a new three-level control scheme is designed. The dynamic performance of the proposed MHPP is validated through digital simulations and employing a small-scale experimental set-up. (author)

  4. A novel off-grid hybrid power system comprised of solar photovoltaic, wind, and hydro energy sources

    International Nuclear Information System (INIS)

    Bhandari, Binayak; Lee, Kyung-Tae; Lee, Caroline Sunyong; Song, Chul-Ki; Maskey, Ramesh K.; Ahn, Sung-Hoon

    2014-01-01

    Highlights: • We propose two hybridization methods for small off-grid power systems consisting solar (PV), wind, and micro-hydro sources. • One of the methods was implemented in a mini-grid connecting Thingan and Kolkhop villages in Makawanpur District, Nepal. • The results can be applied to help achieve Millennium Development Goal 7: Ensuring environmental sustainability. • This is the first implementation anywhere comprising of three renewable energy power, in a single off-grid power system. • This research may be applied as a practical guide for implementing similar systems in various locations. - Abstract: Several factors must be considered before adopting a full-phase power generation system based on renewable energy sources. Long-term necessary data (for one year if possible) should be collected before making any decisions concerning implementation of such a systems. To accurately assess the potential of available resources, we measured solar irradiation, wind speed, and ambient temperature at two high-altitude locations in Nepal: the Lama Hotel in Rasuwa District and Thingan in Makawanpur District. Here, we propose two practical, economical hybridization methods for small off-grid systems consisting entirely of renewable energy sources—specifically solar photovoltaic (PV), wind, and micro-hydro sources. One of the methods was tested experimentally, and the results can be applied to help achieve Millennium Development Goal 7: Ensuring environmental sustainability. Hydro, wind, and solar photovoltaic energy are the top renewable energy sources in terms of globally installed capacity. However, no reports have been published about off-grid hybrid systems comprised of all three sources, making this implementation the first of its kind anywhere. This research may be applied as a practical guide for implementing similar systems in various locations. Of the four off-grid PV systems installed by the authors for village electrification in Nepal, one was

  5. Demystification and localization in the adoption of micro-hydro technology : Insights from India

    NARCIS (Netherlands)

    Höffken, J.I.

    2016-01-01

    The phrase ‘small is beautiful’ holds true for the micro-hydro plants discussed in this article. Micro-hydro plants can convert the energy of falling water into electricity. In India, access to electricity cannot be taken for granted, especially in rural areas, which do not yet have grid extension

  6. A learning-based approach to understanding success in rural electrification : insights from micro hydro projects in Bolivia

    NARCIS (Netherlands)

    Drinkwaard, ir. W.; Kirkels, A.F.; Romijn, H.A.

    2010-01-01

    The paper analyzes the performance of a set of rural Micro Hydro Power (MHP) projects and MHP-implementing organizations in Bolivia, using a learning-based analytical perspective. Rather than identifying a generic set of critical success factors such as access to finance, adequate technological

  7. PowerPal: power up your creek

    International Nuclear Information System (INIS)

    2006-01-01

    PowerPal micro-hydro equipment was developed in Vietnam by Asian Phoenix Resources Ltd. of Victoria, BC; a company who aims to help disadvantaged people in less developed countries by making renewable energy devices available to them. The idea for the micro-hydro system was conceived after mineral exploration parties in Vietnam noted that large numbers of poor quality propeller turbines were being used to supply AC power to individual homes. A plan was developed to improve the quality and reliability of low head turbines with better castings, magnets, superior bearings and electronic load controllers. Funding for the program was initially difficult to obtain. However, PowerPal micro-hydro equipment eventually came to the attention of the World Bank as well as other government and non-governmental organizations. Financing for the purchase and installation of larger numbers of units has now been achieved, and missionary groups in various parts of the world have ordered units. European markets have also opened up, and distributors of the micro-hydro equipment have been appointed in various countries. Sales are now strong in Central America, South America, the Caribbean, Australasia, Oceania, Africa and Europe. It was concluded that the surge of interest has coincided with a steep upturn in oil prices. 8 figs

  8. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  9. Hydro to market green power at special prices

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1996-01-01

    A 600 kW grid-connected demonstration wind turbine at Ontario Place will provide green power to Toronto residents early in 1997. The joint venture project partners include publicly owned Ontario Hydro, Toronto Hydro and Natural Resources Canada. The power will be sold at a premium under arrangements yet to be announced. The green power pricing initiative would allow some customers to buy their electricity at a green price. The project could be a self-financing model for future renewable energy development. The Ontario Place turbine project will determine whether Toronto electricity customers want green power or electricity from nuclear and fossil stations, and could determine which type of generation should be built in the future

  10. Development and performance measurement of micro-power pack using micro-gas turbine driven automotive alternators

    International Nuclear Information System (INIS)

    Sim, Kyuho; Koo, Bonjin; Kim, Chang Ho; Kim, Tae Ho

    2013-01-01

    Highlights: ► We develop micro-power pack using automotive alternator and micro-gas turbine. ► We measure rotordynamic and power generation performance of micro-power pack. ► Micro-power pack shows dramatic increases in mass and volumetric power densities. ► Test results assure feasibility of micro-power pack for electric vehicles. -- Abstract: This paper presents the development of a micro-power pack using automotive alternators powered by a micro-gas turbine (MGT) to recharge battery packs, in particular for electric vehicles (EVs). The thermodynamic efficiency for the MGT with the power turbine is estimated from a simple Brayton cycle analysis. The rotordynamic and power generation performance of the MGT driven alternator was measured during a series of experiments under electrical no-loading and loading conditions, and with belt-pulley and flexible bellows couplings. The flexible coupling showed superior rotordynamic and power generation performance than the belt coupling due to the enhanced alignment of the alternator rotor and the reduced mechanical frictions. Furthermore, the micro-power pack showed dramatic increases in the mass and volumetric power densities by ∼4 times and ∼5 times, respectively, compared with those of a commercial diesel generator with similar power level. As a result, this paper assures the feasibility of the light-weight micro-power pack using a MGT and automotive alternators for EVs.

  11. Some Aspects of Micro-HPP Utilization in the Republic of Moldova

    Directory of Open Access Journals (Sweden)

    Ambros T.

    2015-12-01

    Full Text Available The hydrografic network in the Republic of Moldova and some historical aspects of micro-Hydro Power Plants (mHPP on the country territory have been described. There are presented some models of micro hydro damless samples developed by the Technical University of Moldova.

  12. Gross greenhouse gas fluxes from hydro-power reservoir compared to thermo-power plants

    International Nuclear Information System (INIS)

    Santos, Marco Aurelio dos; Pinguelli Rosa, Luiz; Sikar, Bohdan; Sikar, Elizabeth; Santos, Ednaldo Oliveira dos

    2006-01-01

    This paper presents the findings of gross carbon dioxide and methane emissions measurements in several Brazilian hydro-reservoirs, compared to thermo power generation. The term 'gross emissions' means gas flux measurements from the reservoir surface without natural pre-impoundment emissions by natural bodies such as the river channel, seasonal flooding and terrestrial ecosystems. The net emissions result from deducting pre-existing emissions by the reservoir. A power dam emits biogenic gases such as CO 2 and CH 4 . However, studies comparing gas emissions (gross emissions) from the reservoir surface with emissions by thermo-power generation technologies show that the hydro-based option presents better results in most cases analyzed. In this study, measurements were carried in the Miranda, Barra Bonita, Segredo, Tres Marias, Xingo, and Samuel and Tucurui reservoirs, located in two different climatological regimes. Additional data were used here from measurements taken at the Itaipu and Serra da Mesa reservoirs. Comparisons were also made between emissions from hydro-power plants and their thermo-based equivalents. Bearing in mind that the estimated values for hydro-power plants include emissions that are not totally anthropogenic, the hydro-power plants studied generally posted lower emissions than their equivalent thermo-based counterparts. Hydro-power complexes with greater power densities (capacity/area flooded-W/m 2 ), such as Itaipu, Xingo, Segredo and Miranda, have the best performance, well above thermo-power plants using state-of-the-art technology: combined cycle fueled by natural gas, with 50% efficiency. On the other hand, some hydro-power complexes with low-power density perform only slightly better or even worse than their thermo-power counterparts

  13. Market Power in Hydro-Thermal Supply

    International Nuclear Information System (INIS)

    Edin, Karl-Axel

    2006-12-01

    Despite having had a deregulated electricity market in Sweden for over ten years we still need to increase our understanding as to how deregulated electricity markets actually work and how possible problems are to be solved. One question that is always in focus is if the competition between generators in the Nordic electricity market really works the way it was intended. Many argue that the concentration in ownership of generation plants already has gone too far. Together with joint ownership in nuclear facilities and barriers for entrance, critics say that this has resulted in higher electricity prices than necessary. In this report different methods to (ex ante) study potential possibilities for generating firms to influence the electricity price (market power) and (ex post) discover possible manipulation through analysing the spot price and other observed factors on the electricity market are analysed. The purpose of the longer underlying paper is to give a comprehensive treatment of the electricity market with storage, i.e. hydro power, with an auction market organisation and to test the models on the Nordic market in order to explore the explanatory power of auction market theory and the theory of contestable market. The main theoretical effort in the paper concerns auction theory with inventories. The paper develops an inter-temporal auction model of a thermal-hydro power market. Parallel to the derivation of the basic equations a numerical model is developed in order to illustrate the results of the model. Section 2 of the present paper summarizes the basic equations (derived in the longer paper) for an inter-temporal auction thermal-hydro market. Section 3 contains the illustrations of solutions to equations for some stylized markets. In section 4 the auction model is tested on the Nordic market

  14. Twenty-five years of research in hydro-ecology at the EDF research and development division

    International Nuclear Information System (INIS)

    Gosse, Ph.

    1999-01-01

    Hydro-ecology (or aquatic ecology) is the study of aquatic systems in their interacting aspects: physical, chemical and biological. The creation in 1974 of the Environment Department at EDF Research and Development Division marked the start in France of quantitative hydro-ecology applied to power generation installations. The studies developed around several main themes, determined both the expansion of the nuclear programme and by changes in French environmental regulations, in particular the 1976 law on impact studies, the 1984 fishing and hydro-biology law and the 1992 water law. In this framework, he effect of artificial warming of rivers, eutrophication of continental and marine waters, transfers of mineral micro-pollutants and radionuclides in rivers, and problems specific to hydropower installations such as guaranteed in stream flow or fish pass design, have been studies. This work, conducted in collaboration with many other laboratories, has led to the development of original quantitative approaches, notably in the field of numerical modelling. The paper selects several of the tools developed whose scope of application is wider than the environment and management of thermal or hydropower plants. Two major applications grouping the experience acquired in hydro-ecology are presented: the AGIRE software and the global environment study of the Singrauli area in India. (author)

  15. Application of multi-model control with fuzzy switching to a micro hydro-electrical power plant

    Energy Technology Data Exchange (ETDEWEB)

    Salhi, Issam; Doubabi, Said [Laboratory of Electric Systems and Telecommunications (LEST), Faculty of Sciences and Technologies of Marrakesh, Cadi Ayyad University, BP 549, Av Abdelkarim Elkhattabi, Gueliz, Marrakesh (Morocco); Essounbouli, Najib; Hamzaoui, Abdelaziz [CReSTIC, Reims University, 9, rue de Quebec B.P. 396, F-10026 Troyes cedex (France)

    2010-09-15

    Modelling hydraulic turbine generating systems is not an easy task because they are non-linear and uncertain where the operating points are time varying. One way to overcome this problem is to use Takagi-Sugeno (TS) models, which offer the possibility to apply some tools from linear control theory, whereas those models are composed of linear models connected by a fuzzy activation function. This paper presents an approach to model and control a micro hydro power plant considered as a non-linear system using TS fuzzy systems. A TS fuzzy system with local models is used to obtain a global model of the studied plant. Then, to combine efficiency and simplicity of design, PI controllers are synthesised for each considered operating point to be used as conclusion of an electrical load TS Fuzzy controller. The latter ensures the global stability and desired performance despite the change of operating point. The proposed approach (model and controller) is tested on a laboratory prototype, where the obtained results show their efficiency and their capability to ensure good performance despite the non-linear nature of the plant. (author)

  16. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  17. Piloting a community-based micro-hydro power generation project

    International Nuclear Information System (INIS)

    Buenafe, Menandro B.; Eponio, Melchor P.

    1998-01-01

    A community based microhydro power generation project was successfully piloted in Dulao, Malibcong, Abra. The project started with the identification and evaluation of five potential creeks flowing near villages in the Cordillera hinterlands. All the sites showed comparative hydrologic features except for one factor that decided the project's implementation: the willingness of the people to invest by providing their labor- counterpart. On this account, only the residents of Dulao put their full trust in the implementing institutions, the main reason for the project's success. The micro-hydro power project consisted of an earthen diversion canal that conveyed part of the streamflow unto a forebay located above the powerhouse. The forebay was built of riprap and concrete, equipped with a desilting chamber, trashrack, a spillway, and an overflow canal that directed water to the ricefields downstream. A polyethylenevinyl penstock was laid underground along the slope,from the forebay to the powerhouse. The penstock assumed a Y-configuration inside the powerhouse where the two crossflow turbines were separately mounted on each arms. Two butterfly valves were positioned just before each turbine so that flow can be alternately controlled for the two machines. A tailrace drained the discharge from the turbines back to the same creek. Originally, the setup could only operate the 3kw turbine that ran the ricemill by means of a flat belt drive. Upon further hydrologic study, an 8kw crossflow turbine was installed to a drive a 7.5kva, two-pole, single phase alternator. The 8kw turbine can operate under three design flows, namely: 20,40, and 60 liters per second. The turbine-alternator setup was achieved by a pulley and belt drive arrangement. Typically, the AC generator was provided with monitoring instruments like a volt meter, frequency meter, and ampere meter. An electronic load controller (ELC) was observed to effectively protect the alternator from runaway speeds, over

  18. BC Hydro - IPC review : report on the creation of IPC International Power Corporation and its joint venture with the British Columbia Hydro and Power Authority for the Raiwind power project

    International Nuclear Information System (INIS)

    1997-03-01

    BC Hydro is one of the sponsors involved in the construction of a thermal electric power plant in Raiwind, Pakistan. As a Crown corporation, BC Hydro and its participation in the project is subject to the policies and priorities of the provincial government. This document describes the circumstances surrounding the creation of the International Power Corporation (IPC) and its joint venture with BC Hydro for the development of international power projects including the Raiwind project. The project has provoked much public discussion in British Columbia because of the involvement of Cayman Island companies in the project structure. There is concern with the intermingling of public and private interests in the project, including allegations that an IPC share offering benefited insiders of government and BC Hydro. A description of the history and structure of the Raiwind project and detailed information on the British Columbia participants is provided. Directors and shareholders of the principal corporate participants are listed. The development process in Pakistan, the key features of the project and the underlying agreements among the participants are described. An assessment of potential conflicts of interest and a review of public sector standards and guidelines regarding conflicts of interest is presented. 60 refs., 39 tabs., 6 figs

  19. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    International Nuclear Information System (INIS)

    Wiebe, P.A.

    1994-01-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs

  20. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, P.A

    1994-06-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs.

  1. Potentials for development of hydro-powered water desalination in Jordan

    International Nuclear Information System (INIS)

    Akash, B.A.; Mohsen, M.S.

    1998-01-01

    Due to the increase in population and development in agriculture, Jordan will deplete all of its renewable sources of fresh water in the next few years. On the other hand, the level of the Dead Sea has been falling at a high rate for the past three decades, due to the diversion of water from the Jordan River for irrigation. The solution to these issues could be in finding other alternatives such as the development of hydro-powered water desalination plant. Desalted water would be produced in order to make up for the shortage of fresh water using membrane technology, and thus reserve fresh ground water for future generations. This paper finds, on an annual basis, that about 2133 million cubic meters (MCM) of water can be drawn from the Red Sea. The power generated due to difference in elevation is used to desalinate Red Sea water. About 533 MCM of fresh water is produced in such a process. The brine, which is about 1600 MCM, is discharged into the Dead Sea. (author)

  2. Exploring the impact of reduced hydro capacity and lignite resources on the Macedonian power sector development

    Directory of Open Access Journals (Sweden)

    Taseska-Gjorgievskaa Verica

    2014-01-01

    Full Text Available The reference development pathway of the Macedonian energy sector highlights the important role that lignite and hydro power play in the power sector, each accounting for 40% of total capacity in 2021. In 2030, this dominance continues, although hydro has a higher share due to the retirement of some of the existing lignite plants. Three sensitivity runs of the MARKAL-Macedonia energy system model have been undertaken to explore the importance of these technologies to the system, considering that their resource may be reduced with time: (1 Reducing the availability of lignite from domestic mines by 50% in 2030 (with limited capacity of imports, (2 Removing three large hydro options, which account for 310 MW in the business-as-usual case, and (3 Both of the above restrictions. The reduction in lignite availability is estimated to lead to additional overall system costs of 0.7%, compared to hydro restrictions at only 0.1%. With both restrictions applied, the additional costs rise to over 1%, amounting to 348 M€ over the 25 year planning horizon. In particular, costs are driven up by an increasing reliance on electricity imports. In all cases, the total electricity generation decreases, but import increases, which leads to a drop in capacity requirements. In both, the lignite and the hydro restricted cases, it is primarily gas-fired generation and imports that “fill the gap”. This highlights the importance of an increasingly diversified and efficient supply, which should be promoted through initiatives on renewables, energy efficiency, and lower carbon emissions.

  3. Dyadic design interface between energy and agriculture: the case of Pinthali micro hydro system in Nepal

    NARCIS (Netherlands)

    Regmi, A.

    2003-01-01

    Technology, like society, is heterogeneous. It mirrors the context in which it operates. Micro hydro development in Nepal is a rural energy strategy, which relies on technology and innovation and takes place in a specific social context. In designing this energy strategy, both technology and its

  4. Feasibility analysis of micro hydro plant at nawangan village of pacitan district

    Directory of Open Access Journals (Sweden)

    Diana Dellariam Bayu

    2017-12-01

    Full Text Available Nawangan Village of Pacitan District utilizes Kedung Pasang Micro Hydro Plant (MHP as a power source, but the existing electricity power unable suffice the demand so it needs revitalization by calculating the new unit price and debit because of the previous reference already invalid. The problem is that the investment required for the construction of the MHP must provide benefits for a certain period. This study analyzed the ratio of power and energy potential of MHP with changes in pipe diameter and speed of existing turbines, and calculated the cost. The available power is currently at 112.5 kW and energy is 82150.66 kWh. The results of the analysis show that the power increase can be done up to 142,95 kW a year or equivalent 218%, the energy can be done up to 139.427 kWh a year, meanwhile the benefit is Rp44.566.169, increase Rp26.604.588,- from existing condition or equivalent 148,1% which is done by changing the diameter of penstock and the turbine. Economic analysis of Kedung Pasang MHP development plan shows NPV of Rp6.717.110,- that is greater than 0, the value of IRR is 11% greater than the interest rate set by Bank Negara Indonesia 46 of 10,25% and BCR value of 1,19 is greater than 1, thus the revitalization of Kedung Pasang MHP feasible to be implemented.

  5. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  6. Environmental-impact assessment of hydro-power in Egypt

    International Nuclear Information System (INIS)

    Rashad, S.M.; Ismail, M.A.

    2000-01-01

    The environmental impact of energy production and use with the associated emissions of greenhouse gases, particularly CO 2 , has created much attention and growing concern at both national and international levels. In Egypt, efforts have been directed to incorporate the environment-protection issues within the overall planning of the energy sector, as appropriate to its national commitment and its techno-economic considerations. Over the past decade, 1985-1995, hydro-power had contributed between 28 and 22% of the total energy produced by Egyptian power-plants, while the contribution of the hydro capacity was between 32.4 and 21.5%. Many studies have been carried out on the impacts of the Aswan High Dam on various aspects of the environment. An objective evaluation of the Dam, based on 25 years of operational data, indicated that it has overall been positive even though it has contributed to some environmental problems. These problems, however, are significantly less than most people originally expected. This paper deals with the review and analysis of the detrimental effects of hydro-power in Egypt. An evaluation will be given of the emissions of greenhouse gases from the whole hydro-chain. (Author)

  7. Feasibility study for power generation using off- grid energy system from micro hydro-PV-diesel generator-battery for rural area of Ethiopia: The case of Melkey Hera village, Western Ethiopia

    Directory of Open Access Journals (Sweden)

    Tilahun Nigussie

    2017-07-01

    Full Text Available Electricity supply in Ethiopia is extremely antiquated. Most of the remote rural areas of Ethiopia are not yet electrified. Electrifying these remote areas by extending grid system is difficult and costly. Melkey Hera village is one of a rural community situated in western Ethiopia. In this village, extension of the grid is not yet practical. As the current international trend in rural electrification is to utilize renewable energy resources; solar, wind, biomass, and micro hydro power systems can be seen as alternatives. Therefore, the target of this paper is to investigate the viability of a micro hydro, Photo Voltaic (PV and Diesel Generator-battery hybrid power system options to come up with the best techno-economic and optimum configuration for supplying electricity to this village. The study was performed by an assessment of the predicted village energy demand, the available renewable energy resources, and then using the software called HOMER. The best hybrid system type was described and the optimization of the system configuration was also done. Furthermore, through the simulation of different configuration of the supply system, the optimal mini-grid hybrid system design was established to combine hydro, solar PV, battery energy storage and diesel generator. This system demonstrated to be more reliable in operation, and the most cost-effective for the required level of service. The role of energy storage in system operation also demonstrated to offer additional operational advantages in-terms of reliability and cost savings. Overall, the design results show that the majority of energy obtained from hydropower, which accounts 79%, the PV module covers 20%, and diesel generator is only 1% of the total load consumption. The obtained hybrid system is cost competitive with $\\$$0.133/kWh, which is somewhat good to satisfy the community needs. However, this is more than current energy price in Ethiopia which $\\$$0.06/kWh. If due-merit given

  8. HydroPak: concept design and analysis of a packaged cross-flow turbine

    International Nuclear Information System (INIS)

    2004-01-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed

  9. Mini hydro power in Peninsular Malaysia - the past, present and future

    International Nuclear Information System (INIS)

    Bhaskar Kannan

    2006-01-01

    The early development of mini hydro development in Peninsular Malaysia was carried out by the National Electricity Board (NEB) and the projects developed in the 50s and 60s were Ulu Langat (Selangor), Sempam, Kg. Raja , Kuala Terla, and Robinson Falls (all in Pahang). In the 70s the main effort of hydropower development was concentrated on developing major hydropower projects not only to cater to the country increasing demand for electricity but also to the country needs for flood control. This development was feverishly carried out on the Perak River and the prohects built were Temenggor (384 MW), Bersia (72 MW), Kenering (20 MW), Sg Piah (70 MW) and the Kenyir (400 MW) project in Sungai Terengganu. In late 1970s, the government was keen to electrify the rural areas of Peninsular Malaysia and mini hydro power development was thought of as an option to provide electricity to these areas. The Mini Hydro Department of National Electricity Board (MHD) was then formed to undertake the task of planning, developing and implementing mini hydro projects to meet this government aspiration. Table 1 shows the list of projects identified and implemented and its status

  10. Technological development with reference to hydro-power, nuclear, and alternative energy technologies

    Energy Technology Data Exchange (ETDEWEB)

    Burns, T R; Baumgartner, T

    1985-01-01

    This report outlines a theoretical framework for describing and analyzing the introduction of new technologies and the development of socio-technical systems associated with such innovations. While the report is largely theoretical in nature, it refers to certain strategic aspects of the development of nuclear, hydro-power and alternative energy systems. The ease with which technological innovation and development occur, the directions they take, and the impacts they have on the social and physical environments depend not only on purely technical and economic factors. Barriers, regulators and facilitators are inherent in the socio-political, institutional and cultural structures within which any attempts at innovation and technological development take place. The final section of the report explores some of the implications of the theory for policy and strategy, including consideration of environmental policy.

  11. Method for assessing wind power integration in a hydro based power system

    International Nuclear Information System (INIS)

    Norheim, I.; Palsson, M.; Tande, J.O.G.; Uhlen, K.

    2006-01-01

    The present paper demonstrates a method for assessment of how much wind power that can be integrated in a system with limited transmission capacity. Based on hydro inflow data and wind measurements (for different locations of planned wind farms in an area) it is possible to assess how much wind power that can be fed into a certain point in the transmission network without violating the transmission capacity limits. The proposed method combines the use of market modelling and detailed network analysis in order to assess the probability of network congestions rather than focusing on extreme cases. By computing the probability distribution of power flow on critical corridors in the grid it is possible to assess the likelihood of network congestions and the amount of energy that must be curtailed to fulfil power system security requirements (n-1). This way the assessment is not only made of worst case scenarios, assuming maximal flow from hydro plants and maximal wind power production. As extreme case scenarios are short term and may be solved by market mechanisms or automatic system protection schemes (disconnection of wind power or hydro power), the proposed method may reveal that it would be economic to install more wind power than if only based on analysis of worst case scenarios. (orig.)

  12. The development of small-hydro in China; Le developpement de la petite hydraulique en Chine

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, X. [United Nations Environment Programme, Riso (Denmark); Pan, J. [Chinese Academy of Social Sciences (China). Research Centre for Economic Development

    2007-04-15

    Small hydro is a renewable source of energy that is economically and technically viable. This article described China's investment in small-scale hydroelectric power plants in 1,600 remote communities. Seventy per cent of China's small hydro power stations are concentrated in remote impoverished communities. These power stations provide electricity to 300 million people in China, where half of the territories, one third of the districts and towns, and one quarter of the population depend primarily on this energy source for their electricity needs. The first power station was built in the province of Yunnan in 1912, but the real development of small hydro occurred after 1950, and can be divided into three phases. Phase 1 occurred before 1980 when small hydro power stations concentrated on providing electricity for lighting in rural areas as well as for transforming agriculture and irrigation. For many decades following the foundation of the Republic of China, rural areas did not have access to electricity or had serious shortages of electricity. In order to ensure electricity in isolated and remote areas, the Chinese government requested that local authorities build and exploit small hydro where conditions were favourable, and this while respecting water resources. Phase 2 occurred between 1980s and 1990s, with a focus on improving the performance of small hydro power stations to include electricity provisions for local enterprises. During phase 2, small hydro became a tool for dynamic rural development for farmers to increase their revenues. The latest phase in small hydro development has also helped reduce poverty and develop local economies, but in addition, it plays a role in the long term protection of ecosystems, the environment and rural modernization. Today 660,000 people work for small power stations and most are employed locally. Replacing firewood with electricity has saved 130,000 hectares of forested land and helped protect ecosystems. Small

  13. Rural hydro technology

    International Nuclear Information System (INIS)

    Fowlie, M.

    1999-01-01

    This paper examines the increasing use of micro hydroelectric schemes for power generation in mountainous communities in Asia to alleviate some of the pressures on forests. An example of such a scheme in Pakistan is given, and the installation and operation of small hydro units, socio-economic factors, and the impact of the projects on the position of women in the community are discussed. (UK)

  14. Realisation of a small hydro power plant in the new water reservoir of the water supply of the San Abbondio municipality; Realizzazione di una microcentrale nel nuovo serbatoio dell'acquedotto del comune di S. Abbondio. Progetto definitivo nuovo serbatoio. Progetto di massima e studio varianti microcentrale

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2008-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the construction project of a new water reservoir including a micro-scale hydro power plant in the drinking-water supply of the municipality of San Abbondio, Switzerland. Following the development of residential areas a new water reservoir located at higher elevation is needed. A former preliminary study had demonstrated the feasibility of a micro-scale hydro power plant in the water supply. The adaptation of the plant design to the new situation is described. Investment cost is estimated and several variants are compared. Recommendations are given to the authorities.

  15. Effects of Scandinavian hydro power on storage needs in a fully renewable European power system for various transmission capacity scenarios

    Science.gov (United States)

    Kies, Alexander; Nag, Kabitri; von Bremen, Lueder; Lorenz, Elke; Heinemann, Detlev

    2015-04-01

    can reduce storage needs by up to 50% with respect to stored energy. This requires however large transmission capacities between the major hydro power producers in Scandinavia and the largest consumers of electrical energy in Western Europe. We show how Scandinavian hydro power can reduce storage needs in dependency of the transmission grid for two fully renewable scenarios: The first one has its wind and pv generation capacities distributed according to an empirically derived approach. The second scenario has an optimal spatial distribution to minimize storage needs distribution of wind and pv generation capacities across Europe. We show that in both cases hydro power together with a well developed transmission grid has the potential to contribute a large share to the solution of the generation-consumption mismatch problem. The work is part of the RESTORE 2050 project (BMBF) that investigates the requirements for cross-country grid extensions, usage of storage technologies and capacities and the development of new balancing technologies.

  16. Policy and regulatory framework conditions for small hydro power in Sub-Saharan Africa

    Energy Technology Data Exchange (ETDEWEB)

    Koelling, Fritz [Sustainable Energy and Environment, Karlsruhe (Germany); Gaul, Mirco; Schroeder, Miriam [SiNERGi Consultancy for Renewable Energies, Berlin (Germany)

    2011-07-01

    The vast potential of mini and micro hydro power (MHP) in Sub-Saharan African countries is one promising option to cover increasing energy demand and to enable electricity access for remote rural communities. Based on the analysis of 6 African countries (Ethiopia, Kenya, Mozambique, Nigeria, Rwanda, South Africa), this study sheds light on some of the main barriers on the level of political and regulatory framework conditions which include gap between the national-level policies and regulations and local MHP project implementation, lack of financing and limited capacities for project planning, building and operation. The paper also identifies some promising practices employed in several SSA countries of how to overcome these barriers and concludes with recommendations of how to create positive feed-backs between ambitious policies and regulations and MHP financing and capacity development needs in order to scale up MHP deployment and MHP sector development. (orig.)

  17. HydroPak: concept design and analysis of a packaged cross-flow turbine

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed.

  18. In the spotlight: New hydro development in North America

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    1992 was a year of progress for many segments of the hydropower industry as developers worked to bring new projects on line. This industry overview features several of these projects and offers a preview of 1993 activity. The only operating privately owned hydroelectric project in Texas. The largest hydro plant in the province of Manitoba. The world's largest submersible hydroturbine-generator. These projects and others-completed and placed in service in 1992-can claim a special place in the history books. For each of the 31 hydro projects in North America that began operating in 1992, there's a unique story to tell. Each called upon the time, talent, commitment, ingenuity, and perseverance of those involved in their development. In aggregate, these projects contribute nearly 3,800 MW of clean, renewable electrical capacity that can be used efficiently and cost-effectively to help meet the power demands of customers in the US and Canada. Utilities, state agencies, municipalities, and independent power developers played roles in developing new hydro in 1992. We offer a sampling of their work to illustrate progress made in the past year

  19. Development and applications of reactor noise analysis at Ontario Hydro`s CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O [Ontario Hydro, Toronto, ON (Canada); Tulett, M V [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1996-12-31

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro`s CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  20. Hydro-electric power - potential and limitations

    Energy Technology Data Exchange (ETDEWEB)

    Amundsen, T.

    1995-12-31

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world`s growing population, the unavoidable conclusion is that more power is to be produced. 3 figs.

  1. Hydro-electric power - potential and limitations

    International Nuclear Information System (INIS)

    Amundsen, T.

    1995-01-01

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world's growing population, the unavoidable conclusion is that more power is to be produced. 3 figs

  2. An approach to the investment analysis of small and medium hydro-power plants

    DEFF Research Database (Denmark)

    Forouzbakhsh, Farshid; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Sincea large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments,however it is possible...

  3. Role of pump hydro in electric power systems

    Science.gov (United States)

    Bessa, R.; Moreira, C.; Silva, B.; Filipe, J.; Fulgêncio, N.

    2017-04-01

    This paper provides an overview of the expected role that variable speed hydro power plants can have in future electric power systems characterized by a massive integration of highly variable sources. Therefore, it is discussed the development of a methodology for optimising the operation of hydropower plants under increasing contribution from new renewable energy sources, addressing the participation of a hydropower plant with variable speed pumping in reserve markets. Complementarily, it is also discussed the active role variable speed generators can have in the provision of advanced frequency regulation services.

  4. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  5. Decision making algorithms for hydro-power plant location

    CERN Document Server

    Majumder, Mrinmoy

    2013-01-01

    The present study has attempted to apply the advantage of neuro-genetic algorithms for optimal decision making in maximum utilization of natural resources. Hydro-power is one of the inexpensive, but a reliable source of alternative energy which is foreseen as the possible answer to the present crisis in the energy sector. However, the major problem related to hydro-energy is its dependency on location. An ideal location can produce maximum energy with minimum loss. Besides, such power-plant also requires substantial amount of land which is a precious resource nowadays due to the rapid and unco

  6. The Regulatory Noose: Logan City’s Adventures in Micro-Hydropower

    Directory of Open Access Journals (Sweden)

    Megan Hansen

    2016-06-01

    Full Text Available Recent growth in the renewable energy industry has increased government support for alternative energy. In the United States, hydropower is the largest source of renewable energy and also one of the most efficient. Currently, there are 30,000 megawatts of potential energy capacity through small- and micro-hydro projects throughout the United States. Increased development of micro-hydro could double America’s hydropower energy generation, but micro-hydro is not being developed at the same rate as other renewable sources. Micro-hydro is regulated by the Federal Energy Regulatory Commission and subject to the same regulation as large hydroelectric projects despite its minimal environmental impact. We studied two cases of micro-hydro projects in Logan, Utah, and Afton, Wyoming, which are both small rural communities. Both cases showed that the web of federal regulation is likely discouraging the development of micro-hydro in the United States by increasing the costs in time and funds for developers. Federal environmental regulation like the National Environmental Policy Act, the Endangered Species Act, and others are likely discouraging the development of clean renewable energy through micro-hydro technology.

  7. Provincial hydro expansions

    Energy Technology Data Exchange (ETDEWEB)

    Froschauer, K J

    1993-01-01

    A study of the development of five provincial hydroelectric utilities in Canada indicates that power companies and the state invited manufacturers to use hydroelectricity and natural resources in order to diversify provincial economies. These hydro expansions also show that utilities and government designed hydro projects to serve continental requirements; serving both objectives became problematic. It is argued that when the Canadian state and firms such as utilities use hydro expansions to serve both continentalism and industrialization, then at best they foster dependent industrialization and staple processing. At worst, they overbuild the infrastructure to generate provincial surplus energy for continental, rather than national, integration. Hydro developments became subject to state intervention in Canada mainly through the failures of private utilities to provide power for the less-lucrative industrial markets within provincial subregions. Although the state and utilities invited foreign firms to manufacture hydro equipment within the provinces and others to use electricity to diversify production beyond resource processing, such a diversification did not occur. Since 1962, ca 80% of industrial energy was used to semi-process wood-derived products, chemicals, and metals. The idea for a national power network became undermined by interprovincial political-economic factors and since 1963, the federal national/continential power policy prevailed. 187 refs., 6 figs., 52 tabs.

  8. On-chip micro-power: three-dimensional structures for micro-batteries and micro-supercapacitors

    Science.gov (United States)

    Beidaghi, Majid; Wang, Chunlei

    2010-04-01

    With the miniaturization of portable electronic devices, there is a demand for micro-power source which can be integrated on the semiconductor chips. Various micro-batteries have been developed in recent years to generate or store the energy that is needed by microsystems. Micro-supercapacitors are also developed recently to couple with microbatteries and energy harvesting microsystems and provide the peak power. Increasing the capacity per footprint area of micro-batteries and micro-supercapacitors is a great challenge. One promising route is the manufacturing of three dimensional (3D) structures for these micro-devices. In this paper, the recent advances in fabrication of 3D structure for micro-batteries and micro-supercapacitors are briefly reviewed.

  9. Taylor Hydro plant goes live

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The 12.75 MW Taylor Hydroelectric Plant in Magrath, Alberta, synchronized its generator with the Alberta Power Grid and began production in April 2000. The plant is located on Government of Alberta irrigation works and is owned by Canadian Hydro Developers. During the irrigation season the plant will generate approximately 40 million kilowatt hours of zero-emission 'green' power for consumption, enough to power 5,000 homes for a year. The Taylor plant is a joint venture with EPCOR Power Development Corporation, a wholly-owned subsidiary of EPCOR Inc., the City of Edmonton utility. Canadian Hydro Developers also owns a 19 MW wind plant and a 6 MW gas plant in Alberta and five other 'run of river' hydro plants in Ontario and British Columbia. The company is committed to the concept of low-impact power generation; its ownership of wind run-of-river hydro and gas-fired facilities is proof of that commitment

  10. The Feasibility of Small Hydro-Electric Generation in a Large Urban Area

    OpenAIRE

    Benson Y. Zhang; Adam Taylor

    2012-01-01

    The possibilities of generating electric power from relatively small hydro-electric sources in a large urban area is investigated. Two different aspects of hydro-electric sources have been studied: storm/waste water pipes in large multi-tenanted residential buildings and urban storm water discharge area (CSI area). The potential to generate from these sources has been investigated using a micro-turbine. The potential electric power which could be extracted from the sources was estimated using...

  11. Appraisal of Technical and Economic Potential Micro Hydro Power in Bali

    Directory of Open Access Journals (Sweden)

    Made Suarda

    2012-11-01

    Full Text Available Energy consumption particularly on electrical energy is continuously rising as a result of economical rising and community development. Therefore it needs to be responded about this condition by developing renewable energy utilization which is available. Renewable energy resources are possibly developed in Bali such as solar energy, wind energy, hydropower, sea energy, and biomass. However, one of renewable energy resources that is mostly possible to be developed in Bali is hydropower in micro scale wich is named microhydro. The microhydro works by using water flow which has debit and head. However, it needs an analysis both on technical and financial analysis. Technical analysis is carried out by checking debit and head of the water flow, and then calculates power would be generated, as well as the microhydro equipments such as a suitable choosen of turbine, generator, and control system. In other hand, financial analisis is carried out by estimating cost for construction the microhydro system, then by using Net Present Value (NPV analysis to check that the system is profitable to be constructed. The result noted that Bali has some potential microhydros or pycohydros that are profitable to be developed both on rivers and irrigations system. Financial analyses show that microhydro systems are profitable to be constructed (NPV is positive as long as their heads are at least 10 meters, in other side, debit are more affected their generated powers. However, in their implementations, there are some barriers in utilize those water flow resources as microhydro systems, such as those sites were used for other objects for instant as tourism destinations, or for cultures conservation, and the communities have not knew the advantages of microhydro yet therefore it needs socialization to the communities.

  12. Hydro-energy

    International Nuclear Information System (INIS)

    Bacher, P.; Tardieu, B.

    2005-01-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  13. Hydro Power Reservoir Aggregation via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Markus Löschenbrand

    2017-12-01

    Full Text Available Electrical power systems with a high share of hydro power in their generation portfolio tend to display distinct behavior. Low generation cost and the possibility of peak shaving create a high amount of flexibility. However, stochastic influences such as precipitation and external market effects create uncertainty and thus establish a wide range of potential outcomes. Therefore, optimal generation scheduling is a key factor to successful operation of hydro power dominated systems. This paper aims to bridge the gap between scheduling on large-scale (e.g., national and small scale (e.g., a single river basin levels, by applying a multi-objective master/sub-problem framework supported by genetic algorithms. A real-life case study from southern Norway is used to assess the validity of the method and give a proof of concept. The introduced method can be applied to efficiently integrate complex stochastic sub-models into Virtual Power Plants and thus reduce the computational complexity of large-scale models whilst minimizing the loss of information.

  14. Unmanned operation of Hydro Power Plants

    International Nuclear Information System (INIS)

    Regula, E.

    2008-01-01

    Intentions to launch unmanned operation are no news, the very first occurred in Hydro Power Plants (HPP) at the time when the first computer technology was implemented into process of power generation, i.e. no later than in 1960 s . ENEL entering Slovenske elektrarne not only revived but significantly accelerated the implementation process of unmanned operation. Experience of ENEL says that unmanned operation means better reliability of the HPP and this is the priority. (author)

  15. Improvement of the efficiency of the Agnew micro hydro turbine at part loads due to installing guide vanes mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Yassi, Yousef; hashemloo, Safar [Iranian Research Organization for Science and Technology (IROST), No. 29 Forssat St., Enghelaab Ave., Tehran (Iran)

    2010-10-15

    Agnew turbine is an axial micro hydro of Kaplan type, with its main shaft subtending 45 to the line of horizon. Due to governmental power generating programs for limited hydro potentials in Iran and on the basis of a joint project between the University of Glasgow and the Iranian Research Organization for Science and Technology (IROST), the turbine was developed to operate under low heads and limited flow potentials in Iran. However the turbine was originally designed to operate without any guide vanes and test results showed that the turbine achieved an efficiency of 62% at its best point of performance. Later a modified Agnew turbine, consisting of a guide blades mechanism was designed and manufactured, at (IROST). The mechanism was so designed that it was also used as a second support for the turbine's main shaft. The standard turbine tests proved that; the modified version of the Agnew turbine had 23% higher efficiency at its best performance point; compared to the original design. Then the effects of the improvements on the turbine were studied on the performance of the turbine at part loads. However, efficiency improvements were observed under all part load conditions. (author)

  16. Improvement of the efficiency of the Agnew micro hydro turbine at part loads due to installing guide vanes mechanism

    International Nuclear Information System (INIS)

    Yassi, Yousef; Hashemloo, Safar

    2010-01-01

    Agnew turbine is an axial micro hydro of Kaplan type, with its main shaft subtending 45 deg. to the line of horizon. Due to governmental power generating programs for limited hydro potentials in Iran and on the basis of a joint project between the University of Glasgow and the Iranian Research Organization for Science and Technology (IROST), the turbine was developed to operate under low heads and limited flow potentials in Iran. However the turbine was originally designed to operate without any guide vanes and test results showed that the turbine achieved an efficiency of 62% at its best point of performance. Later a modified Agnew turbine, consisting of a guide blades mechanism was designed and manufactured, at (IROST). The mechanism was so designed that it was also used as a second support for the turbine's main shaft. The standard turbine tests proved that; the modified version of the Agnew turbine had 23% higher efficiency at its best performance point; compared to the original design. Then the effects of the improvements on the turbine were studied on the performance of the turbine at part loads. However, efficiency improvements were observed under all part load conditions.

  17. Cumulative Effects of Micro-Hydro Development on the Fisheries of the Swan River Drainage, Montana, First Annual Progress Report (Covering Field Season July-November 1982).

    Energy Technology Data Exchange (ETDEWEB)

    Leathe, Stephen A.; Graham, Patrick J.

    1984-03-01

    This fisheries study is to determine the potential cumulative biological and economic effects of 20 small or micro-hydro-electric facilities (less than 5 megawatts) proposed to be constructed on tributaries to the Swan River, a 1738 square kilometer (671 square mile) drainage located in northwestern Montana. The study addresses portions of measure 1204 (b) (2) of the Norwthwest Power Planning Council's Columbia River Basin Fish and Wildlife Program. Aerial pre-surveys conducted during 1982 identified 102 stream reaches that may support fish populations in the Swan drainage between Swan and Lindbergh lakes. These reaches were located in 49 tributary streams and constituted 416 kilometers (258 miles) of potential fish habitat. Construction of all proposed small hydro projects would divert water from 54 kilometers (34 miles) or about 13 percent of the tributary system. Only two of the 20 proposed hydro sites did not support trout populations and most were populated by migratory bull trout and westslope cutthroat trout. Potential cumulative habitat losses that could result from dewatering of all proposed project areas were predicted using a stream reach classification scheme involving stream gradient, drainage ara, and fish population data. Preliminary results of this worst case analysis indicate that 23, 19 and 6 percent of the high quality rearing habitat for cutthroat, bull, and brook trout respectively would be lost.

  18. Dead battery? Wind power, the spot market, and hydro power interaction in the Nordic electricity market

    OpenAIRE

    Mauritzen, Johannes

    2011-01-01

    It is well established within both the economics and power system engineering literature that hydro power can act as a complement to large amounts of intermittent energy. In particular hydro power can act as a "battery" where large amounts of wind power are installed. In this paper I use simple distributed lag models with data from Denmark and Norway. I find that increased wind power in Denmark causes increased marginal exports to Norway and that this effect is larger during periods of net ex...

  19. Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant

    International Nuclear Information System (INIS)

    Regula, E.

    2005-01-01

    In this paper thirty years history of the Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant (PSPP) is presented. In 1975 year the Liptovska Mara PSPP was commissioned. There are 2 Kaplan turbines and 2 Derezias reversible turbines with a total installed power 198 MW. The average annual output is 134.5 GWh. As a part of this hydro-engineering structure is Besenova Small-scale power plants with 2 turbines and with installed power 4.64 MW. The average annual output consists 18.3 GWh. There up to end of 2004 year 3,620.172 MWh of electricity was produced. Environmental effects are discussed

  20. An ecological solution in power development strategy: hydroelectric Power

    International Nuclear Information System (INIS)

    Ionescu, S.; Teodorescu, D.

    1994-01-01

    One of the fundamental criteria in establishing the power development strategy is represented by the environmental protection. Besides increasing the power efficiency for users, the hydro power stands for a handy alternative to generate thermal power. Comparatively, if hydro power is properly planed and developed, it could allow conservation of fossil fuel resources (as it makes use of a renewable resources) and avoids air and water pollution and in addition would lead to certain positive effects upon the natural and anthropic environment (flood routing, optimizes the power supply-demand relationship, and so on). By making use of the data available in the international specific literature and the information on the power development strategy in Romania the effects incurred by hydro power are both qualitatively and quantitatively emphasized as compared to alternative power generation by fossil fuel combustion. The proposal is made to adopt certain law regulations as well as a methodology to evaluate the general efficiency of various types of power generating devices suiting the particular conditions of Romania and taking into account the social cost as well as environmental effects. Hence a power development strategy could be undertaking at the national level provided it meets the requirements of both power system and environment protection. (Author)

  1. An approach to the investment analysis of small and medium hydro-power plants

    International Nuclear Information System (INIS)

    Forouzbakhsh, F.; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in 'Bookan, Iran' and SHPP in 'Nari, Iran'), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially

  2. Analysis of Axial Turbine Pico-Hydro Electrical Power Plant in North Sulawesi Indonesia

    Science.gov (United States)

    Sangari, F. J.; Rompas, P. T. D.

    2018-02-01

    This study presents analysis of pico-hydro electrical power plant in North Sulawesi, Indonesia. The objective of this study is to get a design of axial turbine pico-hydro electrical power plant. The method used the study of literature, survey the construction site of the power plant and the characteristics of the location being a place of study, analysis of hydropower ability and analyzing costs of power plant. The result showed that the design of axial turbine pico-hydro installation is connected to a generator to produce electrical energy maximum can be used for household needs in villages. This analyze will be propose to local government of Minahasa, North Sulawesi, Indonesia.

  3. Recovery Act: SeaMicro Volume Server Power Reduction Research Development

    Energy Technology Data Exchange (ETDEWEB)

    Gary Lauterbach

    2012-03-22

    Cloud data centers are projected to be the fastest growing segment of the server market through 2015, according to IDC. Increasingly people and businesses rely on the Cloud to deliver digital content quickly and efficiently. Recovery Act funding from the Department of Energy has helped SeaMicro's technologies enhance the total cost of operation, performance and energy efficiency in large data center and Cloud environments. SeaMicro's innovative supercomputer fabric connects thousands of processor cores, memory, storage and input/output traffic. The company's fabric supports multiple processor instruction sets. Current systems featuring SeaMicro technology typically use one quarter the power and take one sixth the space of traditional servers with the same compute performance, yet deliver up to 12 times the bandwidth per core. Mozilla and eHarmony are two customers successfully using SeaMicro's technology. Numerous non-public customers have been successfully using the SeaMicro product in test and production facilities. As a result of the Recovery Act funding from the U.S. Department of Energy, more than 50 direct jobs were created at SeaMicro. To date, they primarily have been high-value, engineering jobs. Hardware, software and manufacturing engineering positions have been created, as well as sales and sales engineering. The positions have allowed SeaMicro to significantly accelerate engineering development and accelerate commercialization. As a result, commercialization and delivery to market are months ahead of initial schedule. Additional jobs were indirectly created through the development of the SeaMicro product. Through many years of research and hard work prior to receipt of public funding, SeaMicro was awarded 2 patents for its work. SeaMicro's product led the way for industry leaders to reconsider the market for low power servers and create new product lines. With valuable support of the U.S. Department of Energy and through SeaMicro

  4. Proposed Hydro-Quebec development plan, 1990-1992: Horizon 1999

    International Nuclear Information System (INIS)

    1990-01-01

    The supply and demand for electric power in Quebec are reviewed and forecasts of future demand are established, using various scenarios of demographic, economic, and energy development. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. In addition, objectives and strategies are presented for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 36 figs., 54 tabs

  5. Power source labelling and hydro-power - a chance or a risk?

    International Nuclear Information System (INIS)

    Wurche, P.

    2005-01-01

    This short article discusses the electricity labelling legislation passed in Switzerland in November 2004 and similar legislation currently being introduced on a Europe-wide basis. In the future, electricity consumers will be provided with regular information on where and in which type of power station their electricity is generated. The article discusses how such a declaration may affect Swiss hydro-power stations and the changes in customer-perception that the power generation declaration will initiate

  6. An approach to the investment analysis of small and medium hydro-power plants

    Energy Technology Data Exchange (ETDEWEB)

    Forouzbakhsh, F. [University of Tehran (Iran). Faculty of Engineering; Hosseini, S.M.H. [Islamic Azad University, Tehran (Iran). Faculty of Engineering; Vakilian, M. [Sharif Institute of Technology, Tehran (Iran). Faculty of Electrical Engineering

    2007-02-15

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in ''Bookan, Iran'' and SHPP in ''Nari, Iran''), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially. (author)

  7. Mini hydro electric power stations Lukar 1,2,3,4: Public enterprise (JP) Komunalec

    International Nuclear Information System (INIS)

    Stojanova, Blagica

    2004-01-01

    The role of the Public enterprises in improving entire living conditions of the citizens, not only by its services towards the citizenship such as: water supplying and public hygiene but the opportunity to produce the electric power by the Mini hydro electric-power stations built on the main city water supply pipes. The paper presents experiences of building the mini hydro electric power stations Lukar 1,2,3,4. The successful completion of this project should be a motivation for building more electric power stations because there are great water potential in the Republic of Macedonia i.e. there have been recorded more than a hundred places suitable for construction of power electric stations. This will contribute not only for clean ecological energy but will have a direct influence on the total economic development of the Republic of Macedonia. (Author)

  8. Issues regarding the usage of MPPT techniques in micro grid systems

    Science.gov (United States)

    Szeidert, I.; Filip, I.; Dragan, F.; Gal, A.

    2018-01-01

    The main objective of the control strategies applied at hybrid micro grid systems (wind/hydro/solar), that function based on maximum power point tracking (MPPT) techniques is to improve the conversion system’s efficiency and to preserve the quality of the generated electrical energy (voltage and power factor). One of the main goals of maximum power point tracking strategy is to achieve the harvesting of the maximal possible energy within a certain time period. In order to implement the control strategies for micro grid, there are typically required specific transducers (sensor for wind speed, optical rotational transducers, etc.). In the technical literature, several variants of the MPPT techniques are presented and particularized at some applications (wind energy conversion systems, solar systems, hydro plants, micro grid hybrid systems). The maximum power point tracking implementations are mainly based on two-level architecture. The lower level controls the main variable and the superior level represents the MPPT control structure. The paper presents micro grid structures developed at Politehnica University Timisoara (PUT) within the frame of a research grant. The paper is focused on the application of MPPT strategies on hybrid micro grid systems. There are presented several structures and control strategies and are highlighted their advantages and disadvantages, together with practical implementation guidelines.

  9. Realising the potential for the protection of the environment by developing small hydro power

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, R.; Heal, A.

    2000-07-01

    The RAPPIDS project was set up to tackle the conflicts arising from the development of Small Hydro Power (SHP) in sensitive and fragile environments. The project was focused on Snowdonia National Park, which was identified as a conflict area in the UK. The aim was to develop a strategy to overcome these conflicts locally through: improving the understanding of market actors, of the effects of SHP on the environment; improving dialogue between market actors; initiating collaboration to analyse the environmental impacts and test innovative technological measures for sensitive SHP development; Identifying successful environmental measures and assessing their suitability for transfer to other regions; raising the awareness of market actors, of the environmental benefits of SHP. The project in the UK was mirrored in 2 regions of Europe, under the EU Altener programme, and lessons learnt were shared between regions. (author)

  10. Integrated Micro-Power System (IMPS) Development at NASA Glenn Research Center

    Science.gov (United States)

    Wilt, David; Hepp, Aloysius; Moran, Matt; Jenkins, Phillip; Scheiman, David; Raffaelle, Ryne

    2003-01-01

    Glenn Research Center (GRC) has a long history of energy related technology developments for large space related power systems, including photovoltaics, thermo-mechanical energy conversion, electrochemical energy storage. mechanical energy storage, power management and distribution and power system design. Recently, many of these technologies have begun to be adapted for small, distributed power system applications or Integrated Micro-Power Systems (IMPS). This paper will describe the IMPS component and system demonstration efforts to date.

  11. Hydro power in the German system of energy supply; Wasserkraft im Energiesystem Deutschland

    Energy Technology Data Exchange (ETDEWEB)

    Kaltschmitt, M. [Stuttgart Univ. (Germany). Abt. Neue Energietechnologie und Technikanalyse

    1997-12-31

    The technical potentials of electric power generation from hydro power in Germany, the current harnessing of hydro power, its costs, and certain characteristic quantities reflecting its effects on the environment are described. These diverse characteristic quantities are compared with those of other renewable and fossil energy sources used to generate electricity. On this basis, opportunities for extending the use of hydro power in Germany and its limits are discussed. (orig.) [Deutsch] Das Ziel der folgenden Ausfuehrungen ist, die technischen Potentiale und deren derzeitige Nutzung, die Kosten und bestimmte die Umwelteffekte beschreibende Kenngroessen einer Stromerzeugung aus Wasserkraft in Deutschland darzustellen. Diese unterschiedlichen Kenngroessen werden anschliessend mit denen anderer regenerativer Energien und fossiler Energietraeger zur Stromerzeugung verglichen. Ausgehend davon werden die Moeglichkeiten und Grenzen einer weitergehenden Wasserkraftnutzung im Energiesystem Deutschland diskutiert. (orig.)

  12. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  13. Hydro-energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Bacher, P. [Electricite de France (EDF), 75 - Paris (France); Tardieu, B. [Coyne et Bellier, 92 - Gennevilliers (France)

    2005-07-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  14. Power system data communication architecture at BC Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Struyk, E.

    2001-07-01

    Development of a power system data communication architecture (PSDCA) at British Columbia Hydro that enables authorized corporate users to access station-intelligent electronic devices (IEDs) for power system data in non real-time, without compromising the reliability and availability of the real-time SCADA systems, is described. Also discussed is the development of major upgrade initiatives for expanding the use of intelligent electronic devices and remote terminal units (RTUs) which report to the main System Control Centre at Burnaby, BC, and to the four Area Control Centres located throughout the province. The network architecture that incorporates industry standards for PSDCA also provides an opportunity to existing network security systems against electronic threats such as hackers and saboteurs, beyond the simple methods of single or two-level passwords of existing protection control and monitoring equipment systems. The virtual private network (VPN) technology built into the PSDCA will allow secure access to station IED data by corporate users to access their own power data in a secure and reliable fashion. 4 figs.

  15. Design and fabrication of self-powered micro-harvesters rotating and vibrated micro-power systems

    CERN Document Server

    Pan, C T; Lin, Liwei; Chen, Ying-Chung

    2013-01-01

    Presents the latest methods for designing and fabricating self-powered micro-generators and energy harvester systems Design and Fabrication of Self-Powered Micro-Harvesters introduces the latest trends of self-powered generators and energy harvester systems, including the design, analysis and fabrication of micro power systems. Presented in four distinct parts, the authors explore the design and fabrication of: vibration-induced electromagnetic micro-generators; rotary electromagnetic micro-generators; flexible piezo-micro-generator with various widths; and PVDF electrospunpiezo-energy with

  16. Hydro-Quebec strategic plan 2006-2010

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec produces, transmits and distributes electricity through the use of renewable energy sources, particularly hydroelectricity. It also conducts research in energy related fields. This document listed the strategic plan for Hydro-Quebec's 4 main divisions: Hydro-Quebec Production, Hydro-Quebec TransEnergie, Hydro-Quebec Distribution and Hydro-Quebec Energy Society of Bay James. The 2006 to 2010 strategic plan continues to focus on 3 main priorities: energy efficiency; complementary development of hydroelectricity and wind power; and, technological innovation. Hydro-Quebec's objectives also include strengthening the security of Quebec's energy supply and making use of energy as a lever for economic development. The plan for Hydro-Quebec Production calls for accelerating the development of major hydroelectric projects and promoting other renewable forms of energy such as wind power and ensuring the efficiency and reliability of the generating fleet. The utility's objective is to reach 4.7 TWh in energy savings by 2010 and to work toward a target of 8 TWh by 2015. The plan also involves a portfolio of hydroelectric projects totaling 5,400 MW. The plan includes complementary development and integration of 4,000 MW of windpower by 2015. The plan for Hydro-Quebec TransEnergie calls for system reliability and becoming a world benchmark for quality and reliability in wind power integration and deployment of new technologies to enhance performance. The plan for Hydro-Quebec Distribution calls for more efficient use of electricity, increase customer satisfaction and meet electricity needs through the use of renewable energy sources. The utility has made a commitment for 2006 to 2010 to a net income of $2.5 billion per year for a total of $12.5 billion, and a capital investment of 19.4 billion. This paper outlined the contribution of each division to net income and listed the economic benefits for the 2006 to 2010 period. In 2006, the Quebec Energy Board authorized

  17. Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method

    Directory of Open Access Journals (Sweden)

    J. Li

    2018-06-01

    Full Text Available In this paper, to explore the efficiency and rationality of the cascade combined generation, a cascade combined optimal model with the maximum generating capacity is established, and solving the model by the modified GA-POA method. It provides a useful reference for the joint development of cascade hydro-power stations in large river basins. The typical annual runoff data are selected to calculate the difference between the calculated results under different representative years. The results show that the cascade operation of cascaded hydro-power stations can significantly increase the overall power generation of cascade and ease the flood risk caused by concentration of flood season.

  18. Optimal sizing of utility-scale photovoltaic power generation complementarily operating with hydropower: A case study of the world’s largest hydro-photovoltaic plant

    International Nuclear Information System (INIS)

    Fang, Wei; Huang, Qiang; Huang, Shengzhi; Yang, Jie; Meng, Erhao; Li, Yunyun

    2017-01-01

    Highlights: • Feasibility of complementary hydro-photovoltaic operation across the world is revealed. • Three scenarios of the novel operation mode are proposed to satisfy different load demand. • A method for optimally sizing a utility-scale photovoltaic plant is developed by maximizing the net revenue during lifetime. • The influence of complementary hydro-photovoltaic operation upon water resources allocation is investigated. - Abstract: The high variability of solar energy makes utility-scale photovoltaic power generation confront huge challenges to penetrate into power system. In this paper, the complementary hydro-photovoltaic operation is explored, aiming at improving the power quality of photovoltaic and promoting the integration of photovoltaic into the system. First, solar-rich and hydro-rich regions across the world are revealed, which are suitable for implementing the complementary hydro-photovoltaic operation. Then, three practical scenarios of the novel operation mode are proposed for better satisfying different types of load demand. Moreover, a method for optimal sizing of a photovoltaic plant integrated into a hydropower plant is developed by maximizing the net revenue during lifetime. Longyangxia complementary hydro-photovoltaic project, the current world’s largest hydro-photovoltaic power plant, is selected as a case study and its optimal photovoltaic capacities of different scenarios are calculated. Results indicate that hydropower installed capacity and annual solar curtailment rate play crucial roles in the size optimization of a photovoltaic plant and complementary hydro-photovoltaic operation exerts little adverse effect upon the water resources allocation of Longyangxia reservoir. The novel operation mode not only improves the penetration of utility-scale photovoltaic power generation but also can provide a valuable reference for the large-scale utilization of other kinds of renewable energy worldwide.

  19. Study on micro hydro-mechanical deep drawing using finite element method

    Directory of Open Access Journals (Sweden)

    Ma Xiaoguang

    2016-01-01

    Full Text Available A numerical model was established to investigate the micro hydro-mechanical deep drawing process of austenitic stainless steel 304 foil (0.05 mm thickness. Due to the miniaturisation of the specimen size, the effect of grain size, gap distance and radial pressure during drawing process could be prominent. The results indicate that the appropriate radial pressure and gap distance could improve the limit drawing ratio (LDR of manufactured cylindrical cups by reducing the friction resistance. The maximum LDR obtained in the present work reaches 3.2, which is much higher than that obtained by conventional deep drawing process.

  20. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    OpenAIRE

    Febijanto, Irhan

    2013-01-01

    Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from ...

  1. Hydro turbine governor’s power control of hydroelectric unit with sloping ceiling tailrace tunnel

    Science.gov (United States)

    Fu, Liang; Wu, Changli; Tang, Weiping

    2018-02-01

    The primary frequency regulation and load regulation transient process when the hydro turbine governor is under the power mode of hydropower unit with sloping ceiling tailrace are analysed by field test and numerical simulation in this paper. A simulation method based on “three-zone model” to simulate small fluctuation transient process of the sloping ceiling tailrace is proposed. The simulation model of hydraulic turbine governor power mode is established by governor’s PLC program identification and parameter measurement, and the simulation model is verified by the test. The slow-fast-slow “three-stage regulation” method which can improve the dynamic quality of hydro turbine governor power mode is proposed. The power regulation strategy and parameters are optimized by numerical simulation, the performance of primary frequency regulation and load regulation transient process when the hydro turbine governor is under power mode are improved significantly.

  2. Home and away with Norwegian hydro

    International Nuclear Information System (INIS)

    Jones, Simon

    2000-01-01

    Evidence of Norway's position as a world leader in terms of design and construction of hydroelectric power plant, and its position as the biggest producer of hydro in Europe, is presented. There is still some 30 TWh of hydro available for development in Norway. Statkraft is the country's biggest hydro generator: it owns and operates 54 hydro plants and has shares in a further 30. Statkraft's research has shown that there is still a large market for renewables in Europe and believes that householders are prepared to pay a premium for green energy. Statkraft trades energy with Denmark and Sweden and is believed to be planning further growth overseas. The new millennium is set to bring major changes in Norway's power industry: Hafslund and Elkem have already agreed to merge to create the country's biggest privately-owned power group

  3. Pumped Storage Hydro Power Plant Cierny Vah

    International Nuclear Information System (INIS)

    Regula, E.

    1998-01-01

    In this leaflet the pump-storage power plant Cierny Vah is presented. A Cierny Vah pumped storage power plant (PSP) has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system. (ES). It is mainly the pumped storage hydro power plants plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation by especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control, ...) gave way to dynamic functions which gained greater importance. After interconnection of the ES with the UCPTE West European Association in which there are besides other things, the strict criteria for observing balance outputs, the main functions of PSPs are as follows: (1) Dynamic services for ES; (2) Dispatching reserve for the fall out of the greatest ES block; (3) Observing the foreign cooperation balance agreed; (4) Compensation of peaks and also of sudden daily load diagram reductions. Technical parameters of the upper and lower reservoir are described. The hydro power plant is a body lower reservoir. In it there are six vertical pumping aggregates in the three machine layout: the motor-generator - the turbine - the pump. Between the turbine and the pump there is a hydraulically controlled claw clutch engaging at rest and disengaging also during the aggregate operation. During pumping air is involved inside the turbine. The Francis turbines have a

  4. The application of the EMAS-ordinance to small hydro-power-plants

    International Nuclear Information System (INIS)

    Patek, R.

    2000-01-01

    The application of the eco-management and audit scheme ordinance to small hydro-power-plants deals with the possibility to take an environmental-relevant audition on sites of small hydro-power-plants to achieve the environmental EMAS-certificate. Within the realization of the acquired improvement steps also the efficiency of the power plants should be increased that the audit also becomes interesting in economic matters. Contents: after explaining the legal frame being prescribed by the European Community, its interpretation and relevance for the sites of SHP, common impacts of these on the environment are particularized. From these facts a valuation-catalogue has been developed, which will be used by the power plant-owners for the assessment of their sites to take part in the EMAS-system. This catalogue is split up into six modules, which comprise all possible valuation areas which can appear concerning the different kinds of plants. These modules are: MODUL A: backwater area; MODUL B: weir; MODUL C: powerhouse; MODUL D: tail water area; MODUL E: diversion channel / penstock; MODUL F: diversion section. Furthermore three submodules to gather common data concerning plant and river have been created. At the development of the catalogue there was particularly attached importance to a user-friendly application. The goal was to realize the valuation by the plant owners to minimize costs. To take objectiveness into account the module-catalogue was created in a way that auditors (the power plant owners) must not formulate specifications by themselves; the possible assessments only have to be marked with a cross at the corresponding parameters, which have been listed up. (author)

  5. Nuclear power at Ontario Hydro

    International Nuclear Information System (INIS)

    Tapon, F.; Osborne, T.J.

    1980-01-01

    This case study shows that the diffusion of nuclear power in the electric public utility industry in Canada approximates the logistic growth curve, in agreement with previous results on technological innovation diffusion in the U.S. private sector. Many of the economic variables that affect this diffusion in the private sectors in the U.S. and Canada are also significant in the public sector in Canada. Too few utilities have adopted nuclear technology to permit using regression analysis to study the effect of environmental and regulatory factors on the growth of Ontario Hydro. Thus, cost-benefit analysis for each province might be more effective

  6. Optimal Capacity Proportion and Distribution Planning of Wind, Photovoltaic and Hydro Power in Bundled Transmission System

    Science.gov (United States)

    Ye, X.; Tang, Q.; Li, T.; Wang, Y. L.; Zhang, X.; Ye, S. Y.

    2017-05-01

    The wind, photovoltaic and hydro power bundled transmission system attends to become common in Northwest and Southwest of China. To make better use of the power complementary characteristic of different power sources, the installed capacity proportion of wind, photovoltaic and hydro power, and their capacity distribution for each integration node is a significant issue to be solved in power system planning stage. An optimal capacity proportion and capacity distribution model for wind, photovoltaic and hydro power bundled transmission system is proposed here, which considers the power out characteristic of power resources with different type and in different area based on real operation data. The transmission capacity limit of power grid is also considered in this paper. Simulation cases are tested referring to one real regional system in Southwest China for planning level year 2020. The results verify the effectiveness of the model in this paper.

  7. A comparison of the aquatic impacts of large hydro and small hydro projects

    Science.gov (United States)

    Taylor, Lara A.

    The expansion of small hydro development in British Columbia has raised concerns surrounding the effects of these projects, and the provincial government's decision to proceed with Site C has brought attention to the impacts of large hydro. Together, these decisions highlight that there are impacts associated with all energy development. My study examines the aquatic effects of large and small hydro projects using two case study sites: Site C and the Upper Harrison Water Power Project. I first determine the aquatic effects of each of the case study sites. Next, I use existing literature and benefits transfer to determine the monetary value of these effects. My results suggest that, with mitigation, small hydro projects have less of an effect on the environment than a large hydro project per unit of electricity. I also describe the implications of my study in the context of current British Columbia energy policy. Keywords: hydropower; aquatic effects. Subject Terms: environmental impact assessment; benefits transfer.

  8. Development of Hydro-Mechanical Deep Drawing

    DEFF Research Database (Denmark)

    Zhang, Shi-Hong; Danckert, Joachim

    1998-01-01

    The hydro-mechanical deep-drawing process is reviewed in this article. The process principles and features are introduced and the developments of the hydro-mechanical deep-drawing process in process performances, in theory and in numerical simulation are described. The applications are summarized....... Some other related hydraulic forming processes are also dealt with as a comparison....

  9. DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION

    Directory of Open Access Journals (Sweden)

    Sinvaldo Rodrigues Moreno

    2015-04-01

    Full Text Available This paper presents a new approach for short-term hydro power scheduling of reservoirs using an algorithm-based Particle Swarm Optimization (PSO. PSO is a population-based algorithm designed to find good solutions to optimization problems, its characteristics have encouraged its adoption to tackle a variety of problems in different fields. In this paper the authors consider an optimization problem related to a daily scheduling of small hydro power dispatch. The goal is construct a feasible solution that maximize the cascade electricity production, following the environmental constraints and water balance. The paper proposes an improved Particle Swarm Optimization (PSO algorithm, which takes advantage of simplicity and facility of implementation. The algorithm was successfully applied to the optimization of the daily schedule strategies of small hydro power plants, considering maximum water utilization and all constraints related to simultaneous water uses. Extensive computational tests and comparisons with other heuristics methods showed the effectiveness of the proposed approach.

  10. Environmental impact and benefit from hydro-energy: Bulgarian case

    International Nuclear Information System (INIS)

    Vesselinov, V.; Iotova, A.

    1996-01-01

    The present hydro energy system in Bulgaria has been constructed mainly in the period 1950-1965. The currently utilized hydro-power potential, only 33% of the estimated technical potential, includes 87 HPP operating in 1991. A complex assessment of the environmental impact of the hydro energy objects as well as a comparative analysis of all energy sources in Bulgaria is made in the framework of Bulgarian Case Study of the DECADES Inter-Agency Project. The main types of environmental impact related to HPP operation are presented in 7 specific categories: land requirements, changes in the landscape, hydrological changes, micro-climatic changes, geodynamic changes, risk from man-made activities; generation of new ecosystems. A technique of expertise in ball is proposed as a suitable quantitative approach for more precise assessment of impact on climate factors from different energy sources. 2 tabs., 5 refs

  11. The contribution of small hydro power stations to the electricity generation in Greece: Technical and economic considerations

    International Nuclear Information System (INIS)

    Kaldellis, J.K.

    2007-01-01

    Hydropower is the most widely used renewable energy source worldwide, contributing almost with 18.5% to the fulfillment of the planet electricity generation. However, most locations in Europe appropriate for the installation of large hydro power stations have already been exploited. Furthermore, there is a significant local communities' opposition towards new large power stations; hence, small hydro power stations remain one of the most attractive opportunities for further utilization of the available hydro potential. Greece and more precisely the country's mainland possesses a significant hydro-power potential which is up to now only partially exploited. In parallel, a large number of private investors have officially expressed their interest in creating small hydro power stations throughout the country, encouraged by the significant Greek State subsidy opportunities for renewable energy applications. However, up to now a relatively small number of projects have been realized, mainly due to decision-making problems, like the administrative bureaucracy, the absence of a rational national water resources management plan and the over-sizing of the proposed installations. Certainly, if the above problems are suitably treated, small hydro-power plants can be proved considerably profitable investments, contributing also remarkably to the national electricity balance and replacing heavy polluting lignite and imported oil. In the context of the above interesting issues, the present study reviews in detail the existing situation of small hydropower plants in Greece and investigates their future prospects as far as the energy, economic and environmental contribution are concerned

  12. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    McCredie, J.

    1984-01-01

    This report briefly describes Ontario Hydro's nuclear program, examining the design and construction status, and the future from Ontario Hydro's perspective. Ontario Hydro relies heavily on nuclear power. Nuclear fuel was responsible for approximately 34% of Ontario Hydro's energy production in 1983. The nuclear proportion was supplied by twelve operating units located: NPD, Douglas Point, Pickering A and B. It is expected that by approximately 1992, 65% of the total energy needs will be generated through nuclear power

  13. 78 FR 62350 - Lock+ Hydro Friends Fund III, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-10-18

    .... 14540-000] Lock+ Hydro Friends Fund III, LLC; Western Minnesota Municipal Power Agency; Notice...+ Hydro Friends Fund III, LLC for Project No. 14539-000 and Western Minnesota Municipal Power Agency for... CFR 385.2001(a)(2) (2013). On October 21, 2013, at 10:00 a.m. (Eastern Time), the Secretary of the...

  14. 78 FR 70549 - Lock+ Hydro Friends Fund III, LLC, Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-11-26

    .... 14540-000] Lock+ Hydro Friends Fund III, LLC, Western Minnesota Municipal Power Agency; Notice...+ Hydro Friends Fund III, LLC for Project No. 14539-000 and Western Minnesota Municipal Power Agency for... CFR.385.2001(a)(2) (2013). On November 25, 2013, at 10:00 a.m. (Eastern Time), the Secretary of the...

  15. Reliability database development and plant performance improvement effort at Korea Hydro and Nuclear Power Co

    International Nuclear Information System (INIS)

    Oh, S. J.; Hwang, S. W.; Na, J. H.; Lim, H. S.

    2008-01-01

    Nuclear utilities in recent years have focused on improved plant performance and equipment reliability. In U.S., there is a movement toward process integration. Examples are INPO AP-913 equipment reliability program and the standard nuclear performance model developed by NEI. Synergistic effect from an integrated approach can be far greater than as compared to individual effects from each program. In Korea, PSA for all Korean NPPs (Nuclear Power Plants) has been completed. Plant performance monitoring and improvement is an important goal for KHNP (Korea Hydro and Nuclear Power Company) and a risk monitoring system called RIMS has been developed for all nuclear plants. KHNP is in the process of voluntarily implementing maintenance rule program similar to that in U.S. In the future, KHNP would like to expand the effort to equipment reliability program and to achieve highest equipment reliability and improved plant performance. For improving equipment reliability, the current trend is moving toward preventive/predictive maintenance from corrective maintenance. With the emphasis on preventive maintenance, the failure cause and operation history and environment are important. Hence, the development of accurate reliability database is necessary. Furthermore, the database should be updated regularly and maintained as a living program to reflect the current status of equipment reliability. This paper examines the development of reliability database system and its application of maintenance optimization or Risk Informed Application (RIA). (authors)

  16. Design and Development of Micro-Power Generating Device for Biomedical Applications of Lab-on-a-Disc.

    Directory of Open Access Journals (Sweden)

    Karunan Joseph

    Full Text Available The development of micro-power generators for centrifugal microfluidic discs enhances the platform as a green point-of-care diagnostic system and eliminates the need for attaching external peripherals to the disc. In this work, we present micro-power generators that harvest energy from the disc's rotational movement to power biomedical applications on the disc. To implement these ideas, we developed two types of micro-power generators using piezoelectric films and an electromagnetic induction system. The piezoelectric-based generator takes advantage of the film's vibration during the disc's rotational motion, whereas the electromagnetic induction-based generator operates on the principle of current generation in stacks of coil exposed to varying magnetic flux. We have successfully demonstrated that at the spinning speed of 800 revolutions per minute (RPM the piezoelectric film-based generator is able to produce up to 24 microwatts using 6 sets of films and the magnetic induction-based generator is capable of producing up to 125 milliwatts using 6 stacks of coil. As a proof of concept, a custom made localized heating system was constructed to test the capability of the magnetic induction-based generator. The heating system was able to achieve a temperature of 58.62 °C at 2200 RPM. This development of lab-on-a-disc micro power generators preserves the portability standards and enhances the future biomedical applications of centrifugal microfluidic platforms.

  17. Energy supply technologies. Hydro, ocean, wave and tidal

    Energy Technology Data Exchange (ETDEWEB)

    Fenhann, J.; Larsen, Hans [Risoe National Lab. - DTU (Denmark)

    2007-11-15

    This chapter presents an overview of current hydro, ocean, wave and tidal initiatives. Large hydro remains one of the lowest-cost generating technologies, although environmental constraints, resettlement impacts and the limited availability of sites have restricted further growth in many countries. Large hydro supplied 16 % of global electricity in 2004, down from 19 % a decade ago. Large hydro capacity totalled about 720 GW worldwide in 2004 and has grown historically at slightly more than 2 % annually. China installed nearly 8 GW of large hydro in 2004, taking the country to number one in terms of installed capacity (74 GW). With the completion of the Three Gorges Dam, China will add some 18.2 GW of hydro capacity in 2009. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic cost of hydro includes displacements and submergence. Further hydro can improve peak-capacity management. Ocean currents, some of which runs close to European coasts, carry a lot of kinetic energy. Part of this energy can be captured by sub-marine windmills and converted into electricity. These are more compact than the wind turbines used on land, simply because water is much denser than air. The main European countries with useful current power potential are France and the UK. Ocean tides are driven by the gravitational pull of the moon. With one high tide every 12 hours, a tidal power plant can operate for only four or five hours per cycle, so power from a single plant is intermittent. A suitably-designed tidal plant can, however, operate as a pimped storage system, using electricity during periods of low demand to store energy that can be recovered later. The only large, modern example of a tidal power plant is the 240 MW La Rance plant, built in France in the 1960s, which represents 91 % of the world tidal power capacity. Wave energy can be seen as

  18. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  19. The Most Economical Mode of Power Supply for Remote and Less Developed Areas in China: Power Grid Extension or Micro-Grid?

    Directory of Open Access Journals (Sweden)

    Sen Guo

    2017-05-01

    Full Text Available There are still residents without access to electricity in some remote and less developed areas of China, which lead to low living standards and hinder sustainable development for these residents. In order to achieve the strategic targets of solving China’s energy poverty, realizing basic energy service equalization, and comprehensively building up a moderately prosperous society, several policies have been successively promulgated in recent years, which aim to solve the electricity access issue for residents living in remote and less developed areas. It is of great importance to determine the most economical mode of power supply in remote and less developed areas, which directly affects the economic efficiency of public investment projects. Therefore, this paper focuses on how to select the most economical power supply mode for rural electrification in China. Firstly, the primary modes to supply electricity for residents living in the remote and less developed areas are discussed, which include power grid extension mode and micro-grid mode. Secondly, based on the levelized cost of electricity (LCOE technique, the life cycle economic cost accounting model for different power supply modes are built. Finally, taking a minority nationality village in Yunnan province as an example, the empirical analysis is performed, and the LCOEs of various possible modes for rural electrification are accounted. The results show that the photovoltaic (PV-based independent micro-grid system is the most economical due to the minimum LCOE, namely 0.658 RMB/kWh. However, other power supply modes have much higher LCOEs. The LCOEs of power grid extension model, wind-based independent micro-grid system and biomass-based independent micro-grid system are 1.078 RMB/kWh, 0.704 RMB/kWh and 0.885 RMB/kWh, respectively. The proposed approach is effective and practical, which can provide reference for rural electrification in China.

  20. Technical and economic aspects of operation of thermal and hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Bjoern Harald

    1997-12-31

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs.

  1. Technical and economic aspects of operation of thermal and hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Bjoern Harald

    1998-12-31

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs.

  2. Technical and economic aspects of operation of thermal and hydro power systems

    International Nuclear Information System (INIS)

    Bakken, Bjoern Harald.

    1997-01-01

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs

  3. A long-term analysis of pumped hydro storage to firm wind power

    International Nuclear Information System (INIS)

    Foley, A.M.; Leahy, P.G.; Li, K.; McKeogh, E.J.; Morrison, A.P.

    2015-01-01

    Highlights: • This is a long term generation analysis of a high wind power system. • A high CO 2 and fossil fuel price is closest to Ireland’s EU ETS 2020 target. • New pumped storage to firm wind is limited unless strong market costs exist. • Reserve for wind power show that ancillary services are relevant for balancing. - Abstract: Although pumped hydro storage is seen as a strategic key asset by grid operators, financing it is complicated in new liberalised markets. It could be argued that the optimum generation portfolio is now determined by the economic viability of generators based on a short to medium term return on investment. This has meant that capital intensive projects such as pumped hydro storage are less attractive for wholesale electricity companies because the payback periods are too long. In tandem a significant amount of wind power has entered the generation mix, which has resulted in operating and planning integration issues due to wind’s inherent uncertain, varying spatial and temporal nature. These integration issues can be overcome using fast acting gas peaking plant or energy storage. Most analysis of wind power integration using storage to date has used stochastic optimisation for power system balancing or arbitrage modelling to examine techno-economic viability. In this research a deterministic dynamic programming long term generation expansion model is employed to optimise the generation mix, total system costs and total carbon dioxide emissions, and unlike other studies calculates reserve to firm wind power. The key finding of this study is that the incentive to build capital-intensive pumped hydro storage to firm wind power is limited unless exogenous market costs come very strongly into play. Furthermore it was demonstrated that reserve increases with increasing wind power showing the importance of ancillary services in future power systems

  4. Determination of installation capacity in reservoir hydro-power plants considering technical, economical and reliability indices

    DEFF Research Database (Denmark)

    Hosseini, S.M.H.; Forouzbakhsh, Farshid; Fotouh-Firuzabad, Mahmood

    2008-01-01

    One of the most important issues in planning the ‘‘reservoir” type of hydro-power plants (HPP) is to determine the installation capacity of the HPPs and estimate its annual energy value. In this paper, a method is presented. A computer program has been developed to analyze energy calculation...

  5. Fuzzy interpolation of hydro power sales data in Simulink

    DEFF Research Database (Denmark)

    Jantzen, Jan; Eliasson, B.

    1994-01-01

    The problem in this case study can be described as a multi-dimensional surface fit to a given set of data. The data are sales figures in MWH/H for a hydro-thermal power generation system. The data are incomplete and not totally reliable. A model with ten fuzzy rules fits the data with a total error...

  6. Small hydro plant- present scenario and future prospects

    International Nuclear Information System (INIS)

    Purohit, D.P.

    1996-01-01

    The article, deals with the methodology of power generation by small hydro power resources, especially in the Himalayan and sub Himalayan regions and the benefits it will bestow to the inhabitants of this region. The development of small hydro power projects in the Himalayas and sub Himalayas would serve as a model for environment- friendly sources of energy to benefit small communities world wide. The use of water turbine generators for the generation of cheaper power is also discussed. 4 refs

  7. Analysis of the potential of small hydro-power installations - Preliminary study on hydro-power schemes on rivers; Programm Kleinwasserkraftwerke. Potenzialanalyse Kleinwasserkraftwerke - Vorstudie zu Kraftwerken an Fliessgewaessern

    Energy Technology Data Exchange (ETDEWEB)

    Baur, M.; Dettli, R. [econcept AG, Zuerich (Switzerland); Weingartner, R.; Viviroli, D.; Imhof, P.; Faessler, M.; Gerhardinger, H. [University of Berne, Geographisches Institut, Gruppe fuer Hydrologie (GIUB), Berne (Switzerland)

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results obtained from an analysis of the potential of small hydro-power installations in Switzerland. The current situation is reviewed and a 'bottom-up' analysis of the potential available is made. Data is presented on the potential of installations with power-ratings above and below 300 kW. Cantonal case-studies are examined. In a further 'top-down' examination, flow-rates and height-differences are looked at. The development of a 'potential-map' for Switzerland is described. The report is completed with the presentation of the conclusions made from the work. Suggestions for further work that could be done on the subject are made.

  8. Low head hydro market assessment : main report : vol. 1

    International Nuclear Information System (INIS)

    2008-03-01

    Hydroelectric power is a predictable renewable energy source that produces no greenhouse gases (GHGs) and has low maintenance costs. In addition to river resources, low head hydro is available in sluice gates, irrigation canals, drinking water pressure release valves, and municipal wastewater outfalls. Canada's potential for low head hydro has been estimated at 5000 MW at 2000 different sites across the country. Sites of up to 50 MW have been identified in Ontario and Manitoba. This study performed a market assessment on low head hydro developments. Available and emerging technologies for developing low head hydro were identified. The economics of low head hydro in Canada were explored, and barriers to low head hydro development were identified. Strategies to promote low head hydro development were also explored, and the impact of different incentive types on the low head hydropower market were estimated using a simple economic model. It was concluded that a reduced, streamlined, and standardized environmental assessment process will significantly benefit low head hydro development in Canada. 5 refs., 14 tabs., 17 figs

  9. Home grown hydro, part 3: Vision, leadership needed to develop and implement crucial long-term strategies

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, P.A

    1994-09-01

    The Asian Pacific area offers good prospects for Canadian exports of equipment and expertise in the area of hydropower development. Rapidly growing economies in this area have large unsatisfied power demands, and many of these countries have significant undeveloped hydroelectric potential (notably China). Recent Canadian successes in Asia-Pacific hydropower developments are outlined, including the Chamera project in Himachal Pradesh, India; the feasibility study of the Three Gorges project, China; and technical assistance on a 5,000 MW hydroelectric project in Longtan, China. The issues facing Canada for developing and implementing long-term hydro development strategies are discussed. These issues are: establishing Canada's own energy needs; coordination and integration of Canadian hydro resource development; environmental issues and sustainable development; and realizing that energy exports are ethical. Benefits of domestic and international hydro development include environmental friendliness, creation of jobs and markets for Canadian products and expertise, and stimulation of technological and economic development. 1 tab.

  10. Home grown hydro, part 3: Vision, leadership needed to develop and implement crucial long-term strategies

    International Nuclear Information System (INIS)

    Wiebe, P.A.

    1994-01-01

    The Asian Pacific area offers good prospects for Canadian exports of equipment and expertise in the area of hydropower development. Rapidly growing economies in this area have large unsatisfied power demands, and many of these countries have significant undeveloped hydroelectric potential (notably China). Recent Canadian successes in Asia-Pacific hydropower developments are outlined, including the Chamera project in Himachal Pradesh, India; the feasibility study of the Three Gorges project, China; and technical assistance on a 5,000 MW hydroelectric project in Longtan, China. The issues facing Canada for developing and implementing long-term hydro development strategies are discussed. These issues are: establishing Canada's own energy needs; coordination and integration of Canadian hydro resource development; environmental issues and sustainable development; and realizing that energy exports are ethical. Benefits of domestic and international hydro development include environmental friendliness, creation of jobs and markets for Canadian products and expertise, and stimulation of technological and economic development. 1 tab

  11. Comparison of Ontario Hydro's performance with world power reactors - 1981

    International Nuclear Information System (INIS)

    Dumka, B.R.

    1982-04-01

    The performance of Ontario Hydro's CANDU reactors in 1981 is compared with that of 123 world nuclear power reactors rated at 500 MW(e) or greater. The report is based on data extracted from publications, as well as correspondence with a number of utilities. The basis used is the gross capacity factor, which is defined as gross unit generation divided by the perfect gross output for the period of interest. The lowest of the published turbine and generator design ratings is used to determine the perfect gross output, unless the unit has been proven capable of consistently exceeding this value. The first six reactors in the rankings were CANDU reactors operated by Ontario Hydro

  12. Development the Controller Input Power of Peripheral Interfacing Controller Using Other Micro controller

    International Nuclear Information System (INIS)

    Syirrazie Che Soh; Harzawardi Hashim; Nor Arymaswati Abdullah; Nur Aira Abdul Rahman; Mohd Ashhar Khalid

    2011-01-01

    This Controller Input Power of a Peripheral Interfacing Controller was developed using the other micro controller. This paper discuss the switching technique are practiced using proper electronic device to develop the controller, thus enable to control the input power of a PIC in order to expand their interfacing capacity and control. This may allow the PIC could be used to acquire input and control output signal from electronic and electromechanical device and instrument as well as software in wide scale and application. (author)

  13. Effect of turbine materials on power generation efficiency from free water vortex hydro power plant

    International Nuclear Information System (INIS)

    Sritram, P; Treedet, W; Suntivarakorn, R

    2015-01-01

    The objective of this research was to study the effect of turbine materials on power generation efficiency from the water free vortex hydro power plant made of steel and aluminium. These turbines consisted of five blades and were twisted with angles along the height of water. These blades were the maximum width of 45 cm. and height of 32 cm. These turbines were made and experimented for the water free vortex hydro power plant in the laboratory with the water flow rate of 0.68, 1.33, 1.61, 2.31, 2.96 and 3.63 m 3 /min and an electrical load of 20, 40, 60, 80 and 100 W respectively. The experimental results were calculated to find out the torque, electric power, and electricity production efficiency. From the experiment, the results showed that the maximum power generation efficiency of steel and aluminium turbine were 33.56% and 34.79% respectively. From the result at the maximum water flow rate of 3.63 m 3 /min, it was found that the torque value and electricity production efficiency of aluminium turbine was higher than that of steel turbine at the average of 8.4% and 8.14%, respectively. This result showed that light weight of water turbine can increase the torque and power generation efficiency. (paper)

  14. Micro-Combined Heat and Power Device Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — NIST has developed a test facility for micro-combined heat and power (micro-CHP) devices to measure their performance over a range of different operating strategies...

  15. Hydro-Quebec looks to integrated development of Quebec and its regions

    International Nuclear Information System (INIS)

    Bissonnette, Lise

    1995-01-01

    Hydro-Quebec's telecommunication system, the largest private telecommunications network in Canada, was discussed. The network was set up to assure safety and efficiency of the power plants and energy transmission and distribution lines. By the year 2000 Hydro-Quebec will need electronic links with all its industrial, commercial and residential customers in order to guarantee competitive service and full customer satisfaction. Investments of about one half billion dollars have been earmarked to boost the capacity of their telecommunications grid and meet steadily growing needs. As a result of the very difficult negotiations to resolve the native land claims issue, Hydro-Quebec was forced to adapt a strict and far-reaching environmental policy, which is now beginning to pay off not only in environmental terms, but also in terms of goodwill among actual and prospective customers. As a result of these huge infrastructure projects Hydro Quebec will be in a position to guarantee people access to energy at a price that is among the lowest in the world. Although demand growth could slow, demand itself will not wane. As part of this overall strategy, Hydro-Quebec plans to defer large-scale projects, instead, for the foreseeable future it will concentrate on smaller power plants, some of which could be built on rivers that have already been tamed

  16. Performance of a direct drive hydro turbine for wave power generation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Y-H; Kim, C-G [Division of Mechanical and Information Engineering, Korea Maritime University Dongsam-dong 1, Youngdo-ku, Busan, 606-791 (Korea, Republic of); Choi, Y-D; Kim, I-S [Department of Mechanical Engineering, Mokpo National University Muan-ro 560, Chunggye-myun, Jeonnam, 534-729 (Korea, Republic of); Hwang, Y-C, E-mail: lyh@hhu.ac.k [R and D Institute, Shinhan Precision Co. Ltd. Gomo-ri 313, Jinle-myun, Kimhae, 621-881 (Korea, Republic of)

    2010-08-15

    Clean and renewable energy technologies using ocean energy give us non-polluting alternatives to fossil-fueled power plants as a countermeasure against the global warming and growing demand for electrical energy. Among the ocean energy resources, wave power takes a growing interest because of its enormous amount of potential energy in the world. Therefore, various types of wave power system to capture the energy of ocean waves have been developed. However, suitable turbine type is not normalized yet because of relatively low efficiency of the turbine systems. The purpose of this study is to investigate the performance of a newly developed direct drive hydro turbine (DDT), which will be built in a caisson for wave power plant. Experiment and CFD analysis are conducted to clarify the turbine performance and internal flow characteristics. The results show that the DDT obtains fairly good turbine efficiency in both cases of with wave and no wave conditions. As the turbine performance is influenced considerably by the wave condition, designed point of the turbine should be determined according to the wave condition at an expected installation site. Most of the output power generates at the runner passage of the Stage 2.

  17. 78 FR 62350 - FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-10-18

    .... 14491-000] FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing... applications were filed by FFP Qualified Hydro 14, LLC for Project No. 13579-002 and Western Minnesota... regular business day. See 18 CFR 385.2001(a)(2) (2013). On October 21, 2013, at 10:00 a.m. (Eastern Time...

  18. ExternE - valuation of hydro power in Klippen. Final report

    International Nuclear Information System (INIS)

    Nilsson, Maans

    1998-08-01

    ExternE is a pan E uropean project aimed at identifying and quantifying external effects from different energy production technologies around Europe. The Swedish implementation carried out case studies on a biomass plant, a coal plant and a hydro power plant. The conventional approach within the ExternE project is to estimate impacts for each priority pathway associated with the fuel cycle, and then economic methods to obtain estimates for the economic damage of each particular impact pathway. However, in the case of hydro power, it is generally not possible to estimate the most important impacts quantitatively. Therefore, a contingent valuation (CV) study was initiated. In a typical CV-study, a selection of individuals are asked to state their willingness to pay for a certain environmental improvement or to avoid an environmental damage. Welfare economic theory suggests that the well-being effects on people from a change from one situation to another can be measured as their willingness to pay or to accept an economic transaction for this change. Environmental services, such as those provided by a river system, are public services and have generally no market price, but the analyst can use people's stated preferences to determine the correct prices of environmental goods and services. The CV study was initiated to obtain an externality value for Klippens Kraftstation. The performed study was of Ex Ante type, which means estimating the values before the exploitation. For this purpose, a site similar to Klippen but without exploitation, was selected: Vojmaan. Three groups of respondents; the local population, the tourists, and the average Swede, were asked to state their perspective on hydro power development their WTP for preserving Vojmaan in its current condition. The results indicate that Locals and Tourists differ significantly from Swedes. The average willingness to pay is calculated from the respondents who absolutely will pay, and those who maybe pay. The

  19. Prospects of solar photovoltaic–micro-wind based hybrid power systems in western Himalayan state of Himachal Pradesh in India

    International Nuclear Information System (INIS)

    Sinha, Sunanda; Chandel, S.S.

    2015-01-01

    Highlights: • Good prospects of PV–wind hybrid systems are found in western Himalayan Indian state. • A 6 kWp roof mounted PV–micro wind hybrid system at Hamirpur location is studied. • Optimum PV–wind hybrid system configurations are determined for 12 locations in the region. • Comparative analysis of hybrid systems is carried out using ANN, NASA and measured data. • Methodology can be used for assessing the potential of hybrid power systems worldwide. - Abstract: The western Himalayan state of Himachal Pradesh is known as the hydro-power state of India with associated social and environmental problems of large hydro power plants. The reduced water inflow in the rivers during extreme winters affects power generation in the state. Therefore solar and wind resources need to be utilized to supplement power generation requirements. With this objective the prospects of photovoltaic–micro wind based hybrid systems are studied for 12 locations of the state. The NASA data, Artificial Neural Network predicted and ground measured data are used in the analysis of Hamirpur location whereas for remaining 11 locations estimated, NASA and Artificial Neural Network predicted data are used, as measured solar and wind data are not available for most of the locations in the state. Root Mean Square Error between three input data types are found to range from 0.08 to 1.89. The results show that ANN predicted data are close to measured/estimated data. A 6 kWp roof mounted photovoltaic–micro wind hybrid system at Hamirpur with daily average energy demand of 5.2 kWh/day is studied. This system specifications are used to obtain optimum PV–micro wind based hybrid power system configurations for all locations. The optimum configuration for Hamirpur is found to be a 5 kWp micro wind turbine, 2 kW converter, 10 batteries and 8 kWp PV system whereas for other 11 locations a 5 kWp micro wind turbine, 2 kW converter, 10 batteries and 2–9 kWp PV systems are obtained. The

  20. The power of commitment : Newfoundland and Labrador Hydro 2000 annual report

    International Nuclear Information System (INIS)

    2000-01-01

    A consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) was presented with particular focus on energy production, energy sales, the Avalon Transmission upgrade, development of the Granite Canal and Hydro's dam safety program. Hydro reported a 4.5 per cent increase in gross energy production at their generating plants throughout the system. Production from hydro sources also increased by 4.5 per cent to a total of 5,032 GWh. Thermal production from the Holyrood generating facility also increased slightly to 1,040 GWh. Production for peaking and emergency requirements from gas turbines and diesel plants dropped to 0.6 GWh. In 2000, about 83 per cent of all the energy supplied to their customers came from hydro sources. Total energy sales were up 4.6 per cent during 2000. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets, liabilities and capital. tabs., figs

  1. [Ontario Hydro International Inc.]. Annual report 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Ontario Hydro International Inc. is the international representative of Ontario Hydro. OHII operates as a global utility that markets Ontario Hydro's services and products. Its mission is to be the leader in energy efficiency and sustainable development in the international marketplace. This report describes the year's activities in the following areas: Energy management and environment, hydroelectric generation, nuclear products and services, fossil generation, grid (transmission) business, utility management, Asia Power Group Inc. The document also includes financial highlights and international and customer contracts

  2. Himalayan hydro on the horizon

    International Nuclear Information System (INIS)

    Sharp, Timothy

    2000-01-01

    The prospects for development of hydro in the Himalayas has been enhanced by privatisation and the urgent need for clean electricity in the north of India. There are various hurdles to be overcome before the projects are likely to move forward in earnest before 2005, and these are mentioned. The demand for electricity in India is said to be enormous. At present, there is much polluting industry along the Himalayas. As throughout the Indian privatisation dilemma, the critical issues for development of Himalayan hydro come down to credible commercial power markets and finance. With regard to finance and administrative changes, the Indian government is carrying out a number of actions and these are itemised. The US is vigorously promoting the development of Himalayan hydro as a key to much needed regional co-operation and the World Bank is supportive

  3. Manitoba Hydro's earth power program and Manitoba market update

    International Nuclear Information System (INIS)

    Pearson, K.

    2005-01-01

    An outline of Manitoba Hydro's Earth Power program was presented. Details of the heat pump market in Manitoba were provided, including details of residential and commercial sales. Total residential heat pump sales amounted to 577 units in 2004, equivalent to over $11.2 million in sales. Commercial installations amounted to approximately $12.7 million. An outline of industry players was presented. The goals of Manitoba Hydro were outlined in relation to geothermal energy and the Power Smart program. Their objectives included increasing awareness of geothermal energy, making heat pumps more accessible, and improving industry infrastructure. Other objectives included educating the public about life-cycle cost implications, residential loans and commercial incentives. To date, the residential power loan has provided financing to over 300 Manitoba home owners for installations, with electrical savings of over 1.34 Gwh and natural gas savings of 279,425 m 3 . The program is also committed to providing assistance with feasibility studies. Provincial tax credits for the Earth Program included a 10 per cent deduction of geothermal heat pump purchases from corporation income tax. Case studies of the program were presented along with an outline of the geothermal heat pump for homes booklet. Details of the residential earth power loan were provided, including details of installation, system completion and approval processes. Awards and accolades for the program include the 2004 HRAI Education supporter award and recognition by the David Suzuki Foundation, which highlighted the program as a national leader in encouraging and facilitating the use of GeoExchange technology. tabs, figs

  4. Distributionally robust hydro-thermal-wind economic dispatch

    International Nuclear Information System (INIS)

    Chen, Yue; Wei, Wei; Liu, Feng; Mei, Shengwei

    2016-01-01

    Highlights: • A two-stage distributionally robust hydro-thermal-wind model is proposed. • A semi-definite programing equivalent and its algorithm are developed. • Cases that demonstrate the effectiveness of the proposed model are included. - Abstract: With the penetration of wind energy increasing, uncertainty has become a major challenge in power system dispatch. Hydro power can change rapidly and is regarded as one promising complementary energy resource to mitigate wind power fluctuation. Joint scheduling of hydro, thermal, and wind energy is attracting more and more attention nowadays. This paper proposes a distributionally robust hydro-thermal-wind economic dispatch (DR-HTW-ED) method to enhance the flexibility and reliability of power system operation. In contrast to the traditional stochastic optimization (SO) and adjustable robust optimization (ARO) method, distributionally robust optimization (DRO) method describes the uncertain wind power output by all possible probability distribution functions (PDFs) with the same mean and variance recovered from the forecast data, and optimizes the expected operation cost in the worst distribution. Traditional DRO optimized the random parameter in entire space, which is sometimes contradict to the actual situation. In this paper, we restrict the wind power uncertainty in a bounded set, and derive an equivalent semi-definite programming (SDP) for the DR-HTW-ED using S-lemma. A delayed constraint generation algorithm is suggested to solve it in a tractable manner. The proposed DR-HTW-ED is compared with the existing ARO based hydro-thermal-wind economic dispatch (AR-HTW-ED). Their respective features are shown from the perspective of computational efficiency and conservativeness of dispatch strategies.

  5. Issues regarding the modelling and simulation of hybrid micro grid systems

    Science.gov (United States)

    Szeidert, I.; Filip, I.; Prostean, O.

    2016-02-01

    The main followed objectives within control strategies dedicated to hybrid micro grid systems (wind/hydro/solar), that operate based on maximum power point tracking (MPPT) techniques are to improve the conversion systems efficiency and to maintain the quality of the produced electrical energy (the voltage and power factor control). One of the main goals of maximum power point tracking strategy is to achieve the harvesting of the maximal possible energy within a pre-set time period. In order to implement the control strategies for micro grid systems that operate at time variable parameter, there are usually required specific transducers (anemometer for wind speed measurement, optical rotational transducers, taco generators, etc.). In the technical literature there are presented several variants of the MPPT techniques, which are particularized at several applications (wind energy conversion systems, solar systems, hydro plants and micro grid hybrid systems). The maximum power point tracking implementations are mainly based on two-level architecture. The inferior level controls the primary variables, while the superior level represents the MPPT control structure. In the paper, authors present some micro grid structures proposed at Politehnica University Timisoara within the frame of a research grant. The paper is focused on the application of MPPT strategies on hybrid micro grid systems. There are presented several structures and control strategies and are highlighted their advantages and disadvantages, together with practical implementation guidelines.

  6. New markets for small-scale hydro

    International Nuclear Information System (INIS)

    Maurer, E.A.

    1997-01-01

    The market for small and medium sized hydro-electric power plant is more attractive than ever. The boom in Europe has increasingly spread to the emerging countries, and here too small hydro plays an important ecological role. In addition to new plant rehabilitation of 'historical' plant is now a major factor. The last few years have seen a market shift from single machine components to complete plant and systems, requiring a strategy re-think on the part of larger companies. Following the influx of private capital into the power industry, business conditions have also undergone a thorough transformation. In place of 'fast money', hydro power offers the prospect of earning longer-term, sustainable money'. The term small-scale hydro-electric power (or simply 'small hydro') is used slightly differently depending on the country and market. Here, it is used to denote plant with turbines up to 10 MW. (Author)

  7. Complementarity of hydro and wind power: Improving the risk profile of energy inflows

    International Nuclear Information System (INIS)

    Denault, Michel; Dupuis, Debbie; Couture-Cardinal, Sebastien

    2009-01-01

    The complementarity of two renewable energy sources, namely hydro and wind, is investigated. We consider the diversification effect of wind power to reduce the risk of water inflow shortages, an important energy security concern for hydropower-based economic zones (e.g. Quebec and Norway). Our risk measure is based on the probability of a production deficit, in a manner akin to the value-at-risk, simulation analysis of financial portfolios. We examine whether the risk level of a mixed hydro-and-wind portfolio of generating assets improves on the risk of an all-hydro portfolio, by relaxing the dependence on water inflows and attenuating the impact of droughts. Copulas are used to model the dependence between the two sources of energy. The data considered, over the period 1958-2003, are for the province of Quebec, which possesses large hydro and wind resources. Our results indicate that for all scenarios considered, any proportion of wind up to 30% improves the production deficit risk profile of an all-hydro system. We can also estimate the value, in TW h, of any additional one percent of wind in the portfolio. (author)

  8. Financial reporting for the Powersmart programs of British Columbia Hydro and Power Authority

    International Nuclear Information System (INIS)

    Morris, A.T.

    1990-01-01

    The Powersmart program at British Columbia Hydro seeks to minimize the short- and long-term energy costs to customers through the efficient or avoided use of electricity. In determining the overall financial reporting of Powersmart, four areas were reviewed in depth. The question of deferral or expensing of expenditures was examined with reference to accounting principles and industry practice in Canada and the USA. Discussion is provided on the costs that would be deferred, the amortization period of deferred expenses, and financial statement presentation. Deferral and amortization appear appropriate if the costs incurred are recoverable under future rates. The design, development, and implementation of power saving programs are outlined as well as the criteria for selection of an amortization period. At British Columbia Hydro, all Powersmart programs are treated as one type of expense and an amortization period of 7 years has been selected for all programs to simplify the accounting

  9. Pico hydro turbines for electricity in rural areas

    OpenAIRE

    Descotte, Gérard

    2016-01-01

    This article discusses the feedback and lessons learned, particularly from a survey carried out following the deployment program of a pico hydro power solution in a very isolated rural area in north Laos. This project is part of the strategic development for the rural electrification of Laos, in which pico hydro power facilities constitute the main avenue of progress for the electrification of isolated villages.

  10. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  11. Navigating the hydro market in Latin America

    International Nuclear Information System (INIS)

    Yermoli, C.A.

    1995-01-01

    The governments of most Latin American countries have yet to establish clear policies about the future ownership of existing generation assets, but they do expect future capacity to be largely developed by the private sector. There were at one time plans for many government-financed hydro projects in the area, but these projects produced much paper and little electricity. Present trends will take the area toward independent power projects, both hydro projects and thermal power projects. This article is a review of those present trends

  12. Integrated operation of hydro thermal system

    International Nuclear Information System (INIS)

    Nanthakumar, J.

    1994-01-01

    Long-term power system expansion planning studies are carried out to meet the electricity requirement in the future. Prior to the expansion planning studies, it is essential to know the energy potential of the existing generating system, especially the hydro power plants. Detailed hydro thermal stimulation studies of the integrated system is therefore carried out to determine the best way to maximise the hydro energy of the existing and committed plants. The results of the integrated system simulated model are stored in numerous files and are available for retrieval. Most important output used for expansion analysis is the energy production of each hydro plant. The annual hydro energy potential of the total hydro system of Sri Lanka for the hydrological year from 1949 to 1988 is given. Hydro condition data with different probability levels are also indicated

  13. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  14. Natural resources: adjusting and innovating - Hydro-Quebec in the global age

    International Nuclear Information System (INIS)

    Ouellet, D.

    1995-01-01

    Although it is believed that the information economy is replacing the mass economy, many companies continue to grow on economies based on natural resources. Recent aggressive growth by Hydro-Quebec in the highly competitive market for energy products was singled out as one of the success stories. Among other things, Hydro-Quebec was reported to focus attention on the globalization of electricity products, particularly in Asia, Europe and Africa. The corporation was said to cooperate with other utilities companies such as Ontario Hydro and Power Asia Assets Corporation to diversify its markets abroad. Hydro-Quebec is also marketing new products, developed in its laboratories and by subsidiaries, such as power system simulators and power system planning and management systems, on a global scale

  15. Replacement of the Farbtobel hydro power installation in Peist, Switzerland; Gemeinde Peist (GR). Neubau Wasserkraftwerk Farbtobel - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Scherrer, I.; Gadient, N.

    2009-12-15

    This illustrated report for the Swiss Federal Office of Energy (SFOE) deals with various aspects of a small hydro project in Peist, Switzerland. The report presents a project concerning the replacement of the existing Farbtobel small hydro installation. The catchment area involved, its hydrology, high-water considerations and river ecology are examined. The power station concept, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. Remuneration for the power produced through the Swiss cost-covering remuneration scheme is discussed.

  16. Neuro-Fuzzy Computational Technique to Control Load Frequency in Hydro-Thermal Interconnected Power System

    Science.gov (United States)

    Prakash, S.; Sinha, S. K.

    2015-09-01

    In this research work, two areas hydro-thermal power system connected through tie-lines is considered. The perturbation of frequencies at the areas and resulting tie line power flows arise due to unpredictable load variations that cause mismatch between the generated and demanded powers. Due to rising and falling power demand, the real and reactive power balance is harmed; hence frequency and voltage get deviated from nominal value. This necessitates designing of an accurate and fast controller to maintain the system parameters at nominal value. The main purpose of system generation control is to balance the system generation against the load and losses so that the desired frequency and power interchange between neighboring systems are maintained. The intelligent controllers like fuzzy logic, artificial neural network (ANN) and hybrid fuzzy neural network approaches are used for automatic generation control for the two area interconnected power systems. Area 1 consists of thermal reheat power plant whereas area 2 consists of hydro power plant with electric governor. Performance evaluation is carried out by using intelligent (ANFIS, ANN and fuzzy) control and conventional PI and PID control approaches. To enhance the performance of controller sliding surface i.e. variable structure control is included. The model of interconnected power system has been developed with all five types of said controllers and simulated using MATLAB/SIMULINK package. The performance of the intelligent controllers has been compared with the conventional PI and PID controllers for the interconnected power system. A comparison of ANFIS, ANN, Fuzzy and PI, PID based approaches shows the superiority of proposed ANFIS over ANN, fuzzy and PI, PID. Thus the hybrid fuzzy neural network controller has better dynamic response i.e., quick in operation, reduced error magnitude and minimized frequency transients.

  17. Modelling of hydro and wind power in the regulation market

    International Nuclear Information System (INIS)

    Kiviluoma, J.; Holttinen, H.; Meibom, P.

    2006-01-01

    The amount of required regulation capacity in the power system is affected by the wind power prediction errors. A model has been developed which can evaluate the monetary effects of prediction errors. The model can be used to evaluate (1) the regulation costs of wind power, (2) regulation market prices including effects related to the participation of power producers in the regulating power market, (3) value of accurate wind forecasts and (4) the effect of decreasing the length of the spot market clearance. This article discusses the problems related to developing a realistic model of the regulating power market including the interaction between the spot market and the regulating power market. There are several issues that make things complicated. (1) How to calculate the minimum amount of needed secondary (minute) reserves. Traditionally the Nordic TSOs have used an N-1 criteria in each country to determine the required amounts of positive secondary reserve, but as installed wind power capacity grows, it will become relevant to include the wind power prediction errors in the estimation of secondary reserves. (2) Consumption forecast errors and plant outages also contribute to activation of regulating power and should have stochastic input series besides wind power. (3) Risk premiums and transaction costs in the regulating power market are difficult to estimate as well as the effects of the possible use of market power. This is especially true in the Nordic system with the high share of hydro power, since the water value and hydrological limitations make things more complex than in a thermal system. (4) The available regulation capacity is not necessarily equal to the truly available capacity. All producers don't participate in the regulation market although in principle they could. (orig.)

  18. Micro power plants - interests, conflicts and possibilities - a focus group study with emphasis on business and environmental stakeholders; Smaakraftverk - interesser, konflikter og muligheter

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerck, M.; Vistad, O.I.

    2009-05-15

    In recent years, interest for the development of micro hydro-electric power plants have been on the increase. There are many and often varying public interests associated with energy development. We have particularly examined the main arguments that are used and what values seem to be based on prevailing attitudes and opinions. Our selected study sites are three municipalities with a relatively extensive small hydro power development: Foerde, Sogn and Fjordane, Hordaland and Kvinnherad Sirdal in Vest-Agder. We have used qualitative methods through semi-structured interviews and discussions in groups, so-called focus groups. Focus groups create an interaction between group participants that can bring out more information than by interviewing each participant individually. Qualitative methods are used to capture the phenomena and assessments that are difficult to quantify or measure, such as people's views and assessments. Our data is not documented facts, but 'assessments of reality.' We had two focus groups in each municipality, a group with representatives from interested organizations in conservation, outdoor recreation, or personal scientific expertise / interest (referred to as environmental groups), and one with representatives from landowners, developers, and other economic interests (called Business Groups). For many of the topics we touched upon such varied viewpoints fairly systematically between our two groups. Business groups see great economic opportunities for both local communities and landowners, arguing that while the development of small hydro power is a very important environmental measure because it allows renewable energy without adverse climate effects and will replace the climate damaging coal in Europe. Environmental groups argue that the new small hydro energy produces no net greenhouse benefit because it only comes on top of polluting coal power, it replaces it. They think it is important to question the environmental impact

  19. Current status and future developments of small and micro hydro in southern Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2015-01-01

    Full Text Available of plants are in operation or under development. Small and micro hydropower are less well understood. Historically small hydropower has played an important role in the development of the region, but since mid 1960s the emphasis has been on fossil fuel based...

  20. Proposed Hydro-Quebec development plan, 1993: Proposal

    International Nuclear Information System (INIS)

    1992-01-01

    The Quebec government now requires Hydro-Quebec to submit a development plan every three years instead of annually, in order to permit more in-depth studies and a broader consultation with interested parties. In the first of such three-year plans, a series of plan proposals is presented which was developed after a year of consultation with various groups on four fundamental matters: energy efficiency, means of generation, electro-intensive industries, and electricity exports. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. Hydroelectricity will continue to be emphasized as the main source of generation since hydroelectric facilities offer distinct advantages in terms of costs, environmental impacts, and economic spinoffs. The proposed plan also presents objectives and strategies for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 5 figs., 15 tabs

  1. Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' hydroelectric system into the power system of the Republic of Macedonia

    International Nuclear Information System (INIS)

    Rumenova, Evica; Naumoski, Kliment

    2001-01-01

    At the and of 1998, a study on conditions and possibilities of the 'Shara' hydroelectric system construction was prepared. The study considers an interesting idea for building up three reversible power plants. From electricity point of view the study emphasizes several significant issues that require comprehensive analyses in order to define the conditions and possibilities for their development. This paper attempts to give an overview of one of this issues: Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' - system into the power supply system of Republic of Macedonia. (Original)

  2. Hydro under shock

    International Nuclear Information System (INIS)

    Maffezzini, I.; Pineault, E.; Poirier, M.

    1997-01-01

    A discussion of the potential privatisation of Hydro-Quebec, and of the motivation to do so, was presented. The creation of Hydro-Quebec resulted from the nationalization in 1963 of all major electricity producers in the province of Quebec. Since its inception, Hydro-Quebec has gone through many episodes of restructuring but none more far reaching in extent, or in consequences, than the present one. The current deregulation of the electrical industry in Quebec, and the potential commercialization of Hydro-Quebec is considered to be a natural and inevitable result of the current global trend towards competition in the power industry and the demand for greater consumer choice. 1 tab

  3. Gas power production, surplus concepts and the transformation of hydro-electric rent into resource rent

    International Nuclear Information System (INIS)

    Amundsen, Eirik S.

    1997-01-01

    The paper considers the effects of introducing large scale gas power production capacity into an electricity sector based on hydropower. In this process the economic rent is transmitted from the hydro power sector to the resource rent in the gas power sector, but is along the way intermingled with ordinary producer surplus and quasi-rent stemming from increasing cost conditions in the production infrastructure and capacity constraints. The net effect on total rent generated depends on development in demand, demand elasticities, costs saved from delaying hydropower projects and the existence of producer surplus in gas power generation. The paper closes with a discussion of possible tax base changes following from the introduction of a thermal power system based on natural gas

  4. Good prospects for Portuguese small hydro industry

    International Nuclear Information System (INIS)

    Betamio de Almeida, A.; Serranho, H.

    2000-01-01

    The article outlines the history of hydro in Portugal and discusses the current position of small-scale hydro with particular reference to the Portuguese Small Hydro Association (AMPH). Encouraged by legislation, and the Valoren community programme (which defined investment incentives), many new small hydro projects sprang up in Portugal in the 1990s. In some areas of Portugal the water levels were higher than the urban centres where the water is required: how the problems of integrating power and water were addressed is described. The integration of power and irrigation schemes is also mentioned. In the wake of great expansion in the Portuguese hydro industry, there was a sharp reduction (in 1995-6) and the reasons for that are listed. The 1999 tariff was such that it is likely that small hydro will provide 3.8% of the electric power consumed nationally by 2010

  5. Canadian hydro potential in the North American market

    International Nuclear Information System (INIS)

    Adams, K.

    2002-01-01

    Canada's hydro potential in the North American energy market was discussed. Canada is a net exporter of electricity in North America, and since 1990, has exported an average of 28 Terawatt hours/year to the United States. More than 65 per cent of these exports were generated from hydro power plants. It was emphasized that significant reductions in greenhouse gases can be achieved if Canadian hydroelectricity is substituted for coal power generation. It was also noted that although there may not be enough hydro capacity to meet all of North America's energy requirements, development of new large hydro resources in Canada could help meet the growing demand for electricity in the United States. Hydro can also complement other renewable energy sources such as wind and solar. The factors that will determine if Canadian hydropower will contribute to the energy demand are market mechanisms such as greenhouse gas credit trading systems which provide incentive for renewable energy projects. In addition, the existing infrastructure must be expanded both east and west within Canada and north and south between Canada and the United States. 5 figs

  6. Development of Micro-sized Microbial Fuel Cells as Ultra-Low Power Generators Using Nano-engineered Materials and Sustainable Designs

    KAUST Repository

    Mink, Justine E.

    2013-12-01

    Many of the most pressing global challenges today and in the future center around the scarcity of sustainable energy and water sources. The innovative microbial fuel cell (MFC) technology addresses both as it utilizes bacteria to convert wastewaters into electricity. Advancing this technology requires a better understanding of the optimal materials, designs and conditions involved. The micro-sized MFC was recently developed to serve this need by providing a rapid testing device requiring only a fraction of the materials. Further, development of micro-liter scale MFCs has expanded into potential applications such as remote and self-sustained power sources as well as on-chip energy generators. By using microfabrication, the fabrication and assembly of microsized MFCs is potentially inexpensive and mass produced. The objective of the work within this dissertation was to explore and optimize the micro-sized MFC to maximize power and current generation towards the goal of a usable and application-oriented device. Micro-sized MFCs were examined and developed using four parameters/themes considered most important in producing a high power generating, yet usable device: Anode- The use of nano-engineered carbon nanomaterials, carbon nanotubes and graphene, as anode as well as testing semiconductor industry standard anode contact area materials for enhanced current production. 5 Cathode- The introduction of a membrane-less air cathode to eliminate the need for continuous chemical refills and making the entire device mobile. Reactor design- The testing of four different reactor designs (1-75 μLs) with various features intended to increase sustainability, cost-effectiveness, and usability of the microsized MFC. Fuels- The utilization of real-world fuels, such as industrial wastewaters and saliva, to power micro-sized MFCs. The micro-sized MFC can be tailored to fit a variety of applications by varying these parameters. The device with the highest power production here was

  7. Advantages and disadvantages of developing nuclear power

    International Nuclear Information System (INIS)

    Wang Zhixin

    1987-01-01

    To solve the problem of the shortage of electricity in China, an objective assessment of the advantages and disadvantages of generating electricity from different energy sources is necessary. Nuclear power is evaluated against hydro-, oil-, gas- and coal-power. It is proposed to develop nuclear power in a planned way as a sensible long term strategy

  8. Architecture at Hydro-Quebec. L'architecture a Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  9. Vaksvikelva small hydro

    OpenAIRE

    Loe, Daniel Aarset

    2017-01-01

    Norway is in constant need of renewable energy, and hydroelectric power is still the main source. A great future potential can be found in countless small rivers scattered across the country, which could be developed through small hydro projects. In the process of converting mechanical movement - flowing water - into electric energy, about 5% turns into heat. From a power plant with an annual production of 15 GWh, this means energy enough to heat approximately 30 households is lost. In my pro...

  10. Mission: Partnerships - A Socially Responsible Approach for New Hydro-electric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Wojczynski, Ed; Cole, Victoria; Pachal, Shawna; Goulet, Richard

    2010-09-15

    Worldwide there is a desire for clean, secure and renewable energy developed in an environmentally and socially responsible manner. In the Canadian province of Manitoba, where water is an abundant resource, efforts are being undertaken by Manitoba Hydro to achieve this goal through the development of new hydro-electric generating stations in partnership with Aboriginal (indigenous) communities. This paper focuses on the lessons learned by Manitoba Hydro in developing and implementing partnership agreements with northern Aboriginal communities on two new generation projects - the Wuskwatim Generation Project and the Keeyask Generation Project.

  11. How would the privatization of Hydro-Quebec make Quebecers richer?

    International Nuclear Information System (INIS)

    Garcia, C.

    2009-02-01

    In 1962, a total of 46 companies shared Quebec's electricity production, involving no less than 9,710 megawatts of power. The 4 companies that controlled 85 per cent of this power were Hydro-Quebec, Aluminum Company of Canada (Alcan), Shawinigan Water and Power Company and the Gatineau Power Company. At the time, electricity rates also varied considerably throughout Quebec, being extremely high in regions far from Montreal, which hindered potential industrial development in those areas. This report discussed the privatization of Hydro-Quebec and how it could make Quebecers richer. The report discussed the early days of electricity in Quebec and outlined the reasons that led Quebec to nationalize the production and distribution of electricity and to entrust its management to Hydro-Quebec. A summary of the developments undertaken to enable Hydro-Quebec to substantially boost its exports to the United States following liberalization of the American market toward the end of the twentieth century was also provided. A comparison group of companies in the United States involved in the production, transmission and distribution of electricity was also presented in order to analyze Hydro-Quebec's performance from various standpoints. Other topics that were addressed in the report included operational efficiency; use of capital; the experience of the United Kingdom; the rise in electricity rates; a strategy for privatization; the public offering; and protecting Quebec electricity consumers. The role of the Quebec government and of Hydro-Quebec were also examined. Electricity exports and electricity and aluminum smelters were also assessed. The report noted that Hydro-Quebec's annual profit would shrink from $2,882 million to $709 million if it had to pay the market price for the electricity it obtains from Churchill Falls. 23 tabs., 1 fig., 2 appendices

  12. Proceedings of the APPrO 2006 18. annual Canadian power conference and trade show : Green Power Conference : Canada's leading renewable energy conference

    International Nuclear Information System (INIS)

    Brooks, J.

    2007-01-01

    This conference provided a forum for members of the Association of Power Producers of Ontario to discuss recent developments in renewable energy and the electric power industry. An overview of Ontario's renewable standard offer program was provided. Members of the conference also discussed case studies of Ontario renewable energy projects including micro-hydro; anaerobic digesters; stand-alone wind power; and solar energy. The economics of wind power were discussed, and current capital costs for renewable energy technology projects were reviewed. Other topics included the use of base-load nuclear and hydro-electricity; the closing down of coal-fired generation; the integration of wind power; and natural gas and cogeneration. Issues related to interconnected power supplies were also reviewed. Discussions were divided into 5 topics : (1) an introduction to the standard offer program; (2) provincial procurement of green power; (3) case studies of stand-alone project; (4) distributed generation and the standard offer process; and distribution approval and connection issues. refs., tabs., figs

  13. Heat and power from MicroGen

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-10-01

    This paper reports on the design of a domestic gas-fired cogeneration system developed to replace the central heating boiler. Technical details of the MicroGen demonstration unit are given, and the use of a Linear Free Piston Stirling Engine as the prime mover, and the results of modelling studies of energy demand indicating cost savings compared to conventional boilers are discussed. The enhancement of the benefits of micro-cogeneration through use of thermal and power storage and energy demand management, and the impact of micro-cogeneration on energy use in the home are considered. The UK and European Commission's targets for increased cogeneration capacity are noted.

  14. Renewable energy in pakistan: part-II mini/micro hydropower plants

    International Nuclear Information System (INIS)

    Maher, M.J.

    2005-01-01

    Part-1 of this series dealt with Wind-Energy Prospects in Pakistan. This second part gives a brief account Mini/Micro Hydro-Power Plants in Pakistan. Hydropower is well-known throughout the world and currently contributes 6-7% of total world energy-production and 20% of total world electricity generation. Most of the hydro-plants are usually designed for higher generation capacity than that which could be needed to utilize the average water-flows. Small hydro-plants are another potential source of energy among the non-conventional energy sources, which can reduce the load on conventional-energy production. Small hydropower technology is today a mature and proven technology. Civil works and installation of equipment involve simple process, which offer good opportunity to local people for employment and use locally available materials Nevertheless a small decentralized hydel plant, based on natural waterfalls is a very desirable option for geographically remote, but naturally suitable locations which are otherwise far from the national physical infrastructure. The development of Mini/Micro hydel stations in these areas, with isolated, thinly clustered, population, is a very appropriate solution to meet power-needs of such areas for lighting as well as cottage industry. The unique feature of these installations is the participation of local community to the optimum extent. The entire civil works, the intake system, power channel, forebay, penstock and power house building, as well as labour is provided by the inhabitants voluntarily. While maximum use is made of stone, with minimum use of cement, the generator, distribution wires, etc., need to be arranged from the market. The turbine is manufactured using indigenous materials. The installation-cost per KW is relatively low i.e. Rs. 25,000/- as compared to large-scale installations. There could of course be variations, in the installation-cost, depending on the market prices of the material. (author)

  15. Report and recommendations in the matter of British Columbia Hydro and Power Authority and an inquiry into a Heritage Contract for British Columbia Hydro and Power Authority's existing generation resources and regarding stepped rates and transmission access

    International Nuclear Information System (INIS)

    Hobbs, R.H.; Hall, K.L.; Bradley, P.G.

    2003-01-01

    Under British Columbia's new energy plan, the BC Utilities Commission made recommendations on two main policy initiatives regarding regulation of BC Hydro. The first involved a Heritage Contract that would ensure any benefits attributable to the existing low-cost generation of BC Hydro would be secured for British Columbians. The Heritage Contract had the support of all participants. The proposal was based on the revenue required by Generation to meet the cost of supplying the energy of Heritage Resources to Distribution. The second recommendation involved a stepped rate structure for large commercial and industrial customers to encourage a more efficient use of energy resources and private investments in new generation. It also recommends concurrent implementation of time-of-use rates. BC Hydro had also proposed a significant change in the determination and disposition of Trade Income between BC Hydro and Powerex. The agreement stipulated that Trade Income would no longer include revenues from the sale of surplus power, except for profits realized by Powerex after paying BC Hydro an indexed price for surplus power. All Trade income up to $200 million would accrue to the ratepayers. This report presents 3 alternatives to the Trade Income proposal and several others recommendations dealing with transmission voltage customers and generation access, legislation, regulation and special directions. The report identified a schedule for implementation of retail access by the end of 2004. 9 appendices

  16. Island operation - modelling of a small hydro power system

    Energy Technology Data Exchange (ETDEWEB)

    Skarp, Stefan

    2000-02-01

    Simulation is a useful tool for investigating a system behaviour. It is a way to examine operating situations without having to perform them in reality. If someone for example wants to test an operating situation where the system possibly will demolish, a computer simulation could be a both cheaper and safer way than to do the test in reality. This master thesis performs and analyses a simulation, modelling an electronic power system. The system consists of a minor hydro power station, a wood refining industry, and interconnecting power system components. In the simulation situation the system works in a so called island operation. The thesis aims at making a capacity analysis of the current system. Above all, the goal is to find restrictions in load power profile of the consumer, under given circumstances. The computer software used in simulations is Matlab and its additional program PSB (Power System Blockset). The work has been carried out in co-operation with the power supplier Skellefteaa Kraft, where the problem formulation of this master thesis was founded.

  17. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland

    International Nuclear Information System (INIS)

    2008-05-01

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18 th century. A permanent license to use at most 3 m 3 /s is available. The study concludes that the maximum flow rate of 6 m 3 /s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m 3 /s.

  18. Hydro-Quebec: research and development highlights 1998

    International Nuclear Information System (INIS)

    1999-01-01

    1998 confirmed once again that any planning in R and D must take into consideration unforeseen events. Actions are measured against their profitability, and R and D must contribute to increasing a company's competitive edge by providing it with new sources of revenue, by ensuring that it benefits from real savings and coming up with the best possible solutions to its technological problems. Hydro-Quebec's results attest to the fact that R and D is an investment that contributes to the utility's profitability. Whether trying to reduce maintenance costs through robot systems or cameras, improving injection methods for repairing dams, developing monitoring systems or new devices aimed at increasing the availability of equipment or reducing the environmental impact of its installations, the company's R and D projects have helped maintain its position as a world leader in the generation and transmission of hydroelectric power. The company is counting on technological innovation to boost the revenues of th e utility's business units. Examples include the work done to optimize the management of energy reserves, increase the network's load-flow capacity and flexibility, generate an electrical supply that meets international standards, and offer alternative distribution system solutions. Other projects involve improving turbine efficiency by modelling fluid flow, devising methods for forecasting natural inflows, analyzing losses in saturation transformers, developing the intelligent power system, and studying transient stability in real time, load frequency control, and customized power quality. Further projects are aimed at developing technologies and services that increase client loyalty and expand the client base such as research into energy management for low income clients, use of geothermal energy, new applications for electrotechnologies, electromagnetic compatibility, drive power and applications of lignin

  19. Power and dignity: the social consequences of hydro-electric development for the James Bay Cree

    International Nuclear Information System (INIS)

    Niezen, R.

    1993-01-01

    The social impact that large-scale hydro-electric development has on the Cree of James Bay following the construction of the La Grande Complex was discussed. Many environmental changes were brought about by dam construction. The project, which also involved the first settlement (the James Bay and Northern Quebec Agreement) directed at extinguishing aboriginal title to land and natural resources in Canada, resulted in several relocations of Cree communities. In addition to compensation, the Agreement included a formal procedure for environmental and social impact assessment for development projects. However, there was little commitment, as a matter of corporate or government policy, to monitoring any of the social impacts. This paper is a preliminary response to an appeal for attention to be focused on the social consequences of hydro-electric development for the Cree in James Bay. Data from social service files indicate that the rapid centralization of the James Bay Cree into structured communities led to social instability in the villages, reflected by high frequencies in suicide, neglect of children, vandalism and drug and alcohol abuse. The material presented here is expected to serve as a warning that in further developing the far North of Quebec the pace of social change in Cree society will have to be slowed down to avoid social destruction of the native communities. 15 refs., 2 tabs

  20. Power and dignity: the social consequences of hydro-electric development for the James Bay Cree

    Energy Technology Data Exchange (ETDEWEB)

    Niezen, R [Harvard Univ., Boston, MA (United States)

    1993-11-01

    The social impact that large-scale hydro-electric development has on the Cree of James Bay following the construction of the La Grande Complex was discussed. Many environmental changes were brought about by dam construction. The project, which also involved the first settlement (the James Bay and Northern Quebec Agreement) directed at extinguishing aboriginal title to land and natural resources in Canada, resulted in several relocations of Cree communities. In addition to compensation, the Agreement included a formal procedure for environmental and social impact assessment for development projects. However, there was little commitment, as a matter of corporate or government policy, to monitoring any of the social impacts. This paper is a preliminary response to an appeal for attention to be focused on the social consequences of hydro-electric development for the Cree in James Bay. Data from social service files indicate that the rapid centralization of the James Bay Cree into structured communities led to social instability in the villages, reflected by high frequencies in suicide, neglect of children, vandalism and drug and alcohol abuse. The material presented here is expected to serve as a warning that in further developing the far North of Quebec the pace of social change in Cree society will have to be slowed down to avoid social destruction of the native communities. 15 refs., 2 tabs.

  1. Development and applications of reactor noise analysis at Ontario Hydro's CANDU reactors

    International Nuclear Information System (INIS)

    Gloeckler, O.; Tulett, M.V.

    1995-01-01

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro's CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  2. Comparison of simulated and measured response of load rejection on A hydro power plant model with mixed mode nonlinear controller

    Energy Technology Data Exchange (ETDEWEB)

    Babunski, Darko; Tuneski, Atanasko; Zaev, Emil [Faculty of Mechanical Engineering, ' Ss. Cyril and Methodius' University, Skopje (Macedonia, The Former Yugoslav Republic of)

    2014-07-01

    Revised Hydro Power Plant model of the IEEE working group recommended converted to state space model is used for simulation of transient response of hydro turbine, and verification was made using measurements of transients from real Hydro Power Plant (HPP). Nonlinear mixed model controller was designed and implemented into complete HPP simulation model and compared with PID with real parameters used in HPP, and with adjusted PID parameters with consideration of smallest frequency error. Verification of performance of the model was made comparing model response with measured load rejection, which is worst case of HPP operation. (Author)

  3. Neuro-fuzzy modelling of hydro unit efficiency

    International Nuclear Information System (INIS)

    Iliev, Atanas; Fushtikj, Vangel

    2003-01-01

    This paper presents neuro-fuzzy method for modeling of the hydro unit efficiency. The proposed method uses the characteristics of the fuzzy systems as universal function approximates, as well the abilities of the neural networks to adopt the parameters of the membership's functions and rules in the consequent part of the developed fuzzy system. Developed method is practically applied for modeling of the efficiency of unit which will be installed in the hydro power plant Kozjak. Comparison of the performance of the derived neuro-fuzzy method with several classical polynomials models is also performed. (Author)

  4. The marginalization of "small is beautiful": Micro-hydroelectricity, common property, and the politics of rural electricity provision in Thailand

    Science.gov (United States)

    Greacen, Christopher Edmund

    This study analyzes forces that constrain sustainable deployment of cost-effective renewable energy in a developing country. By many economic and social measures, community micro-hydro is a superior electrification option for remote mountainous communities in Thailand. Yet despite a 20 year government program, only 59 projects were built and of these less than half remain operating. By comparison, the national grid has extended to over 69,000 villages. Based on microeconomic, engineering, social barriers, common pool resource, and political economic theories, this study investigates first, why so few micro-hydro projects were built, and second, why so few remain operating. Drawing on historical information, site visits, interviews, surveys, and data logging, this study shows that the marginal status of micro-hydro arises from multiple linked factors spanning from village experiences to geopolitical concerns. The dominance of the parastatal rural electrification utility, the PEA, and its singular focus on grid extension are crucial in explaining why so few projects were built. Buffered from financial consequences by domestic and international subsidies, grid expansion proceeded without consideration of alternatives. High costs borne by villagers for micro-hydro discouraged village choice. PEA remains catalytic in explaining why few systems remain operating: grid expansion plans favor villages with existing loads and most villages abandon micro-hydro generators when the grid arrives. Village experiences are fundamental: most projects suffer blackouts, brownouts, and equipment failures due to poor equipment and collective over-consumption. Over-consumption is linked to mismatch between tariffs and generator technical characteristics. Opportunities to resolve problems languished as limited state support focused on building projects and immediate repairs rather than fundamentals. Despite frustrations, many remain proud of "their power plant". Interconnecting and selling

  5. Analysis of the Hydro-Quebec development plan 1992-2010

    International Nuclear Information System (INIS)

    Bernard, J.-T.; Genest-Laplante, E.

    1994-01-01

    In November 1992, the Quebec provincial utility Hydro-Quebec presented its development plan for the 1992-2010 period and shortly thereafter introduced its 1993-1995 energy efficiency commitments. The plan is analyzed using a model that incorporates the main institutional features of electricity price setting. Two scenarios are constructed. The first incorporates Hydro-Quebec's electricity demand forecast and the second allows electricity demand to respond to its price. A comparative analysis shows that electricity demand in the province should increase faster than forecast by Hydro-Quebec until 2010. In fact, demand could exceed the predicted level by ca 16 TWh, or 8.6%. This larger increase is due to a fall in the real price of electricity, itself caused by a government imposed fall in the real unit cost of the utility's operation. This last constraint is the real challenge faced by Hydro-Quebec. 12 refs., 7 tabs

  6. Small steps for hydro

    International Nuclear Information System (INIS)

    Wicke, Peter

    1998-01-01

    The government in Peru has decided to utilise its gas reserves and restrict hydro to relatively small schemes. A number of reasons for the decision are given. In 1997, the Shell-Mobile-Bechtel-COSAPI consortium was formed and agreements were signed regarding exploiting Gas de Camisea. The country's energy needs to 2010 are being assessed. It is likely that by 2001 the whole of south Peru will be receiving gas from Camisea. The Peru situation is discussed under the headings of (i) existing capacity, (ii) growing demands, (iii) a history of hydro in Peru, (iv) electrification and SHP and (v) outlook. The future for Peru's electric energy development is bright. While most of its new power capacity will come from natural gas, the small hydros also have a part to play. A stronger commitment of national and regional political authorities to consider supplies outside the big cities is said to be needed. (UK)

  7. Hydro-Quebec looks south

    International Nuclear Information System (INIS)

    Ross, P.

    1997-01-01

    The recent introduction of Hydro-Quebec, the Canadian utility, into selling cheap electric power in the United States (US) deregulated power market is described, following applications to the US Federal Energy Regulatory Commission. As its prices are so much cheaper than its US competitors, it is expected that the company will soon have many willing customers across the USA. Hydro-Quebec will remain a publicly owned utility, but has experienced restructuring in order to meet this new competitive challenge. (UK)

  8. Cost determination of the electro-mechanical equipment of a small hydro-power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ogayar, B.; Vidal, P.G. [Grupo de Investigacion IDEA, Escuela Politecnica Superior, University of Jaen, Campus de Las Lagunillas, s/n. 23071-Jaen (Spain)

    2009-01-15

    One of the most important elements on the recovery of a small hydro-power plant is the electro-mechanical equipment (turbine-alternator), since the cost of the equipment means a high percentage of the total budget of the plant. The present paper intends to develop a series of equations which determine its cost from basic parameters such as power and net head. These calculations are focused at a level of previous study, so it will be necessary to carry out the engineering project and request a budget to companies specialized on the construction of electro-mechanical equipment to know its cost more accurately. Although there is a great diversity in the typology of turbines and alternators, data from manufacturers which cover all the considered range have been used. The above equations have been developed for the most common of turbines: Pelton, Francis, Kaplan and semiKaplan for a power range below 2 MW. The obtained equations have been validated with data from real installations which have been subject to analysis by engineering companies working on the assembly and design of small plants. (author)

  9. Micro generation from renewable resources - secure and sustainable

    International Nuclear Information System (INIS)

    Khan, S.A.

    2011-01-01

    Pakistan's power demand is mainly satisfied by fossil fuel, which is not abundant and major source of global warming/climate change. A sustainable and secure alternative for Pakistan would be to exploit its indigenous and renewable energy (RE) resources like hydro, solar and wind with public participation. Pakistan receives year-round solar irradiance, which can become a major power producer in urban and non-arable areas. Secondly, locally managed run-of-river micro hydro projects can be an important source of power generation in Northern Pakistan. Thirdly, small wind turbines installed in coastal and windy areas of Southern Pakistan can serve as significant electricity producers. The limiting factors in the case of power from RE are: space, cost, storage, vested interests and reluctance to change. Regardless of production technique, the power shortfall can be controlled to some extent by energy conservation, managing heat loss, transmission and distribution losses and by having energy-efficient buildings and appliances. (author)

  10. Hydro models and salmon recovery in the northwest

    International Nuclear Information System (INIS)

    Dragoon, K.

    1993-01-01

    Hydro regulation models provide extensive support for analyzing the efficacy of salmon recovery plans in the Northwest. Power planners developed these computer programs to help plan and efficiently operate a large multiple use river system. The models represent physical relationships and operational requirements on the system. They also simulate coordinated system operations for efficient power generation. These models are being pressed into service to provide data for fish recovery plans. They provide important information about hydro system capabilities and responses to recovery programs. However, the models cannot meet all of the analytical needs of fish biologists working toward salmon recovery

  11. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Science.gov (United States)

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  12. Microfabrication and Test of a Three-Dimensional Polymer Hydro-focusing Unit for Flow Cytometry Applications

    Science.gov (United States)

    Yang, Ren; Feeback, Daniel L.; Wang, Wan-Jun

    2005-01-01

    This paper details a novel three-dimensional (3D) hydro-focusing micro cell sorter for micro flow cytometry applications. The unit was microfabricated by means of SU-8 3D lithography. The 3D microstructure for coaxial sheathing was designed, microfabricated, and tested. Three-dimensional hydrofocusing capability was demonstrated with an experiment to sort labeled tanned sheep erythrocytes (red blood cells). This polymer hydro-focusing microstructure is easily microfabricated and integrated with other polymer microfluidic structures. Keywords: SU-8, three-dimensional hydro-focusing, microfluidic, microchannel, cytometer

  13. Hydro-Quebec: research and development highlights 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    1998 confirmed once again that any planning in R and D must take into consideration unforeseen events. Actions are measured against their profitability, and R and D must contribute to increasing a company's competitive edge by providing it with new sources of revenue, by ensuring that it benefits from real savings and coming up with the best possible solutions to its technological problems. Hydro-Quebec's results attest to the fact that R and D is an investment that contributes to the utility's profitability. Whether trying to reduce maintenance costs through robot systems or cameras, improving injection methods for repairing dams, developing monitoring systems or new devices aimed at increasing the availability of equipment or reducing the environmental impact of its installations, the company's R and D projects have helped maintain its position as a world leader in the generation and transmission of hydroelectric power. The company is counting on technological innovation to boost the revenues of the utility's business units. Examples include the work done to optimize the management of energy reserves, increase the network's load-flow capacity and flexibility, generate an electrical supply that meets international standards, and offer alternative distribution system solutions. Other projects involve improving turbine efficiency by modelling fluid flow, devising methods for forecasting natural inflows, analyzing losses in saturation transformers, developing the intelligent power system, and studying transient stability in real time, load frequency control, and customized power quality. Further projects are aimed at developing technologies and services that increase client loyalty and expand the client base such as research into energy management for low income clients, use of geothermal energy, new applications for electrotechnologies, electromagnetic compatibility, drive power and applications of lignin.

  14. Modelling the economics of combined wind/hydro/diesel power systems

    International Nuclear Information System (INIS)

    Sinha, A.

    1993-01-01

    A model that stimulates the performance and economics of a combined wind/hydro/diesel plant with pumped storage has been developed. It is applied to a hypothetical site to demonstrate how a subset of the cheapest configuration of plant sizes may be identified, illustrating in particular the trade-off between the hydro storage capacity and the wind turbine penetration. It seems that, with the wind and water regimes employed, pumped storage is unlikely to have significant benefits, but may be beneficial in areas without natural inflow, in which case the reservoir is used as a store for excess wind output. (author)

  15. A Simplified Control Method for Tie-Line Power of DC Micro-Grid

    Directory of Open Access Journals (Sweden)

    Yanbo Che

    2018-04-01

    Full Text Available Compared with the AC micro-grid, the DC micro-grid has low energy loss and no issues of frequency stability, which makes it more accessible for distributed energy. Thus, the DC micro-grid has good potential for development. A variety of renewable energy is included in the DC micro-grid, which is easily affected by the environment, causing fluctuation of the DC voltage. For grid-connected DC micro-grid with droop control strategy, the tie-line power is affected by fluctuations in the DC voltage, which sets higher requirements for coordinated control of the DC micro-grid. This paper presents a simplified control method to maintain a constant tie-line power that is suitable for the DC micro-grid with the droop control strategy. By coordinating the designs of the droop control characteristics of generators, energy storage units and grid-connected inverter, a dead band is introduced to the droop control to improve the system performance. The tie-line power in the steady state is constant. When a large disturbance occurs, the AC power grid can provide power support to the micro-grid in time. The simulation example verifies the effectiveness of the proposed control strategy.

  16. Higher profits, lower bills : a new electricity strategy for Hydro-Quebec

    International Nuclear Information System (INIS)

    2010-01-01

    Quebec is the fourth largest producer of hydro-electricity in the world, and has among the lowest electricity rates in North America. In 2008, 89 percent of the electricity produced by Hydro-Quebec was sold in the province, and the remainder was exported. In 2009, the electric utility released its strategic plan for 2009 to 2013. Hydro-Quebec's net profits are forecast to decline by 24 percent by 2013 and electricity rates are forecast to rise by 8.5 percent. Since Hydro-Quebec has already developed all of the province's low-cost hydroelectric resources, it can no longer increase profits and lower rates by building new hydropower production stations. In order to continue to prosper, the utility will invest in energy efficiency and better coordination of its power system with Ontario's. Increased electricity exports from Hydro-Quebec will help both Ontario and the United States reduce their greenhouse gas emissions by displacing fossil power generation. 25 refs., 2 tabs., 3 figs.

  17. OVERVIEW OF A NEW METHOD FOR DESIGNING HIGH EFFICIENCY SMALL HYDRO POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Milun Babić

    2010-01-01

    Full Text Available Significant number of research projects in the area of renewable energy sources (especially for small hydro power plants has been made within the Department for Energy and Process Engineering and Regional Euro Energy Efficiency Center at Faculty of Mechanical Engineering (University of Kragujevac, Serbia since early eighties. The results are various; numerous domestic and international recognition and technical performance tell about the success of the research. Research projects have been following the technical and technological development of research equipment and economy growth. This has led to the development of software for designing turbines of SHP plants. In order to notify the public about possibilities of our software, in this paper is briefly described a mathematical model and procedures for calculating and designing of SHPP for known conditions. As an argument for assessing the validity and potential of our research results is shown constructed SHP plant "Bosnia 1", 2 x 100 kW power.

  18. Planning of micro-combined heat and power systems in the Portuguese scenario

    International Nuclear Information System (INIS)

    Monteiro, Eliseu; Moreira, Nuno Afonso; Ferreira, Sergio

    2009-01-01

    High efficiency cogeneration is seen by the European Commission as part of the solution to increase energy efficiency and improve security of supply in the internal energy markets. Portuguese residential sector has an estimated technical market potential of around 500 MW e for cogeneration of e in size. Additionally, in Portugal there is a specific law for power production in low voltage, where at least 50% of the produced electric energy must be own consumed and the maximum power delivered to the power utility should be less than 150 kW e . Therefore, generic application tools cannot be applied in this regard. In this work, we develop the MicroG model for planning micro-CHP plants in agreement with the Portuguese energy legal framework. The model is able to design, evaluate and optimize from the techno-economic point of view any micro-CHP plant. MicroG appeals to some data bases, such as micro-cogeneration technologies and power consumption profiles that are also described. In addition, a practical case on a gym is considered to show all the functionalities of the model. The developed model has proven to be extremely useful from the practical point of view. This model could help the development of the micro-CHP Portuguese market, which in turns contributes to accomplish the targets of Kyoto protocol and EU cogeneration Directive. Other improvements to MicroG model can be made in order to enlarge the range of application to other micro-cogeneration technologies and to accomplish with the CO 2 emissions trading

  19. Planning of micro-combined heat and power systems in the Portuguese scenario

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Eliseu; Moreira, Nuno Afonso [CITAB, University of Tras-os-Montes e Alto Douro, P-5000-911 Vila Real (Portugal); Ferreira, Sergio [R and D Department, Tecaprod S.A. (Portugal)

    2009-03-15

    High efficiency cogeneration is seen by the European Commission as part of the solution to increase energy efficiency and improve security of supply in the internal energy markets. Portuguese residential sector has an estimated technical market potential of around 500 MW{sub e} for cogeneration of <150 kW{sub e} in size. Additionally, in Portugal there is a specific law for power production in low voltage, where at least 50% of the produced electric energy must be own consumed and the maximum power delivered to the power utility should be less than 150 kW{sub e}. Therefore, generic application tools cannot be applied in this regard. In this work, we develop the MicroG model for planning micro-CHP plants in agreement with the Portuguese energy legal framework. The model is able to design, evaluate and optimize from the techno-economic point of view any micro-CHP plant. MicroG appeals to some data bases, such as micro-cogeneration technologies and power consumption profiles that are also described. In addition, a practical case on a gym is considered to show all the functionalities of the model. The developed model has proven to be extremely useful from the practical point of view. This model could help the development of the micro-CHP Portuguese market, which in turns contributes to accomplish the targets of Kyoto protocol and EU cogeneration Directive. Other improvements to MicroG model can be made in order to enlarge the range of application to other micro-cogeneration technologies and to accomplish with the CO{sub 2} emissions trading. (author)

  20. Competition policy and regulation in hydro-dominated electricity markets

    International Nuclear Information System (INIS)

    Rangel, Luiz Fernando

    2008-01-01

    This paper discusses the main competition issues that arise in electricity systems dominated by hydro generation, arguing that technological differences between hydro and thermal plants may allow hydropower producers to exert market power in different and subtler ways compared to thermal generators. The key for market power in hydro-based systems is the strategic allocation of a given amount of output across periods, rather than a straightforward reduction of total output. The paper examines the interaction between strategic hydro reservoir operation and transmission capacity constraints, and summarizes the implications of market power for system reliability. A review of recent relevant literature is included. Finally, possible interventions to mitigate market power are analysed

  1. Micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to characterise the state of ten Micro Hydroelectric Power Plants (MHPPs) installed in the west region of Cameroon, in preparation for their modernization. The work was carried out between January 2006 and December 2008. Each site was visited at least once a month. During these ...

  2. EDITORIAL: The 6th International Workshop on Micro and Nanotechnologies for Power Generation and Energy Conversion Applications (PowerMEMS 2006)

    Science.gov (United States)

    Fréchette, Luc G.

    2007-09-01

    Energy is a sector of paramount importance over the coming decades if we are to ensure sustainable development that respects our environment. The research and development of novel approaches to convert available energy into usable forms using micro and nanotechnologies can contribute towards this goal and meet the growing need for power in small scale portable applications. The dominant power sources for handheld and other portable electronics are currently primary and rechargeable batteries. Their limited energy density and adverse effects on the environment upon disposal suggest that alternative approaches need to be explored. This special issue will showcase some of the leading work in this area, initially presented at PowerMEMS 2006, the 6th International Workshop on Micro and Nanotechnologies for Power Generation and Energy Conversion Applications. Power MEMS are defined as microsystems for electrical power generation and other energy conversion applications, including propulsion and cooling. The range of power MEMS technologies includes micro thermodynamic machines, such as microturbines, miniature internal combustion engines and micro-coolers; solid-state direct energy conversion, such as thermoelectric and photovoltaic microstructures; micro electrochemical devices, such as micro fuel cells and nanostructure batteries; vibration energy harvesting devices, such as piezoelectric, magnetic or electrostatic micro generators, as well as micro thrusters and rocket engines for propulsion. These can either be driven by scavenging thermal, mechanical or solar energy from the environment, or from a stored energy source, such as chemical fuel or radioactive material. The unique scope leads to unique challenges in the development of power MEMS, ranging from the integration of novel materials to the efficient small scale implementation of energy conversion principles. In this special issue, Mitcheson et al provide a comparative assessment of three inertial vibration

  3. Transient Control of Synchronous Machine Active and Reactive Power in Micro-grid Power Systems

    Science.gov (United States)

    Weber, Luke G.

    power. The scope of this work is to • develop a mathematical model for a salient pole, 2 damper winding synchronous generator with d axis saturation suitable for transient analysis, • develop a mathematical model for a voltage regulator and excitation system using the IEEE AC8B voltage regulator and excitation system template, • develop mathematical models for an energy storage primary control system, LC filter and transformer suitable for transient analysis, • combine the generator and energy storage models in a micro-grid context, • develop mathematical models for electric system components in the stationary abc frame and rotating dq reference frame, • develop a secondary control network for dispatch of micro-grid assets, • establish micro-grid limits of stable operation for step changes in load and power commands based on simulations of model data assuming net load on the micro-grid, and • use generator and electric system models to assess the generator current magnitude during phase-to-ground faults.

  4. Assessing the role of large hydro in Canada's electricity future

    International Nuclear Information System (INIS)

    Lee Pochih

    1992-01-01

    Electric power in Canada was first generated by steam in the 1880s. The use of hydroelectricity spread rapidly due to abundant water resources and the nationalization of power companies by the provinces; by 1920, 97% of Canadian electricity production came from hydroelectric plants. Thermal generation became competitive by the 1960s, when most of the best hydro sites had been developed, and nuclear generation also started gaining a share of the market. By 1991, hydroelectricity's share of Canadian power production had declined to around 60%. Hydroelectric power has long been used as an instrument of Canadian industrial policy. Given the amount and importance of utility capital expenditures, it was recognized that hydropower development could serve such policy objectives as job creation, industrial development, and macroeconomic stabilization. Creation of provincially owned utilities led to construction of large hydroelectric projects, notably in Quebec, British Columbia, Manitoba, and Newfoundland. The 20 largest hydroelectric power plants in Canada have a total installed capacity of 35,704 MW, representing ca 59% of Canada's total 1991 hydro capacity. The construction of such large projects is not expected to proceed as quickly as in the past because of environmental concerns. However, a number of factors favor continuation of development of hydro resources: a remaining potential estimated at ca 44,000 MW; simplification of electricity export regulations; more stringent air pollution standards that favor non-polluting energy sources; and a moratorium on nuclear power plants in Ontario. 4 tabs

  5. The capacity credit of micro-combined heat and power

    International Nuclear Information System (INIS)

    Hawkes, A.D.; Leach, M.A.

    2008-01-01

    This article is concerned with development of a methodology to determine the capacity credit of micro-combined heat and power (micro-CHP), and application of the method for the UK. Capacity credit is an important parameter in electricity system planning because it measures the amount of conventional generation that would be displaced by an alternative technology. Firstly, a mathematical formulation is presented. Capacity credit is then calculated for three types of micro-CHP units-Stirling engine, internal combustion engine, and fuel cell systems-operating under various control strategies. It is found that low heat-to-power ratio fuel cell technologies achieve the highest capacity credit of approximately 85% for a 1.1 GW penetration when a heat-led control strategy is applied. Higher heat-to-power ratio Stirling engine technology achieves approximately 33% capacity credit for heat-led operation. Low heat-to-power ratio technologies achieve higher capacity credit because they are able to continue operating even when heat demand is relatively low. Capacity credit diminishes as penetration of the technology increases. Overall, the high capacity credit of micro-CHP contributes to the viewpoint that the technology can help meet a number of economic and environmental energy policy aims

  6. Feasibility study of a Green Power Plant. Final report. [Offshore pumped hydro storage

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-03-15

    This project is a technical evaluation and a feasibility study of a concept called the Green Power Plant (GPP), developed by Seahorn Energy Aps. The Green Power Plant is an offshore pumped hydro storage facility constructed from prefabricated elements and with integrated renewable energy production. Pumped hydro storage is a known technology with a proven roundtrip energy storage efficiency of 80%. The focus of the GPP project is on simplifying and industrializing the construction of the reservoir wall, thereby achieving a cost efficient solution. The reservoir structure is dependent on the site on which the reservoir is established, thus Kriegers Flak in the Baltic Sea has been chosen as basis for the technical evaluation. As soil conditions vary, the technical evaluations have been based on a general soil profile. A water depth of 25m has been chosen as basis for the evaluation. A reservoir with a diameter of 2 km has been evaluated as baseline scenario. Feasibility of the GPP was evaluated based on the cost and income estimates. For the baseline scenario an internal rate of return of 6.6% was found for a period of 35 years. A sensitivity analysis reveals internal rates of return over 35 years varying from 4.9% to 10.9%. Especially larger reservoir diameters increase profitability of the GPP. The results from this project will be utilized in raising funds for further development of the GPP concept. Seahorn Energy Aps aims at optimizing the wind turbine integration, the steel pile wall structure and the pump-turbine integration in a future project towards construction of a demonstration facility. (LN)

  7. From centralized hydro-thermal to decentralized renewable : the Austrian challenge

    International Nuclear Information System (INIS)

    Brauner, G.

    2007-01-01

    Austria's electricity production scheme is currently based on 67 per cent hydro power, 25 per cent fossil thermal power and 8 per cent new renewable energy, including wind, biomass, and photovoltaic conversion. As demand on centralized energy systems increases, the power generation, transmission and distribution system in the country will have to be restructured to increase the portion of regenerative generation. Decentralized micro-grid structures are a promising concept for meeting the target of efficiency improvement and renewable generation because they make it possible to use regenerative energy where it is collected. The most efficient way to meet the challenges of efficiency improvement and emission reduction is the replacement of old coal-fired power stations by new combined-cycle gas power stations with combined heat and power. This will reduce both carbon dioxide emissions as well as specific fossil energy demand. However, in just 1 decade the emission reduction achieved by fuel switching and higher efficiency of power stations will be equalized by higher demand, which is growing at an annual rate of 2 per cent. Future energy problems will be characterized by the security of supply; climatic change and the need for clean energy technologies; the lack of transmission-routes; and growing energy demand. The regenerative energy in Austria currently consists of hydraulic large run-of-river hydraulic generation as well as small scale hydro and large scale hydro storage systems. Biomass currently has a total generating capacity of 280 MW and forms 3.14 per cent of generation in Austria. Wind has reached a capacity of 950 MW and forms 3.8 per cent of generation in Austria. It was concluded that the future philosophy in energy supply will not be to try to increase regenerative generation according to growing demand, but to improve end-use efficiency and reduce demand according to the renewable regional potential. 4 refs., 4 figs

  8. Hydro turbines: An introduction

    International Nuclear Information System (INIS)

    Gordon, J.L.

    1993-01-01

    The various types of hydraulic turbines currently used in hydroelectric power plants are described. The descriptions are intended for use by non-engineers who are concerned with fish passage and fish mortality at a hydro power facility. Terminology used in the hydro industry is explained. Since the extent of cavitation is one of the factors affecting mortality rates of fish passing through hydraulic turbines, an equation is introduced which measures the extent of cavitation likely to be experienced in a turbine. An example of how the cavitation index can be calculated is provided for two typical power plants. The relation between certain parameters of power plant operation and the extent of cavitation, and therefore of fish mortality, is illustrated. 2 refs., 14 figs

  9. Analysis of the spontaneous variations in wind power and necessary continuous regulation of hydro-electric and thermal power, related to a future Swedish power system

    Energy Technology Data Exchange (ETDEWEB)

    Holm, J O; Lindstrom, P O

    1982-09-01

    Wind power is unlike conventional electric power generation, since the output fluctuates uncontrollably. These fluctuations must be balanced by controlled generation from other power sources. This will create new and interesting demands on the reserves in the power system. The short-term fluctuations have a low simultaneity factor and must be balanced by an automatic frequency control reserve. In Sweden, this consists of automatically controlled hydro-electric power. The report contains calculations of the amount by which the demand on reserves will increase when wind power is introduced.

  10. Fouling in small hydro projects; Verschmutzung von Kleinwasserkraftwerken - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Abgottspon, A.; Staubli, T.

    2010-03-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at fouling problems encountered in small hydro installations. The report is based on ten interviews made with operators of small hydro power stations in Switzerland. A parallel project carried out in Germany is mentioned. A large variation in the degree of fouling in the various hydro power stations is noted. Sources such as leaves in autumn and algae are discussed, as are the various rinsing procedures used to clear the turbines of fouling. Power losses are discussed and measures that can be taken to prevent fouling are described. Measurements made at an installation in Freienstein, Switzerland, are presented and discussed. The report is completed with an appendix containing calculations, details on the Freienstein power plant and the results of interviews made with the ten hydro power installations examined.

  11. Special Application Thermoelectric Micro Isotope Power Sources

    International Nuclear Information System (INIS)

    Heshmatpour, Ben; Lieberman, Al; Khayat, Mo; Leanna, Andrew; Dobry, Ted

    2008-01-01

    Promising design concepts for milliwatt (mW) size micro isotope power sources (MIPS) are being sought for use in various space and terrestrial applications, including a multitude of future NASA scientific missions and a range of military applications. To date, the radioisotope power sources (RPS) used on various space and terrestrial programs have provided power levels ranging from one-half to several hundred watts. In recent years, the increased use of smaller spacecraft and planned new scientific space missions by NASA, special terrestrial and military applications suggest the need for lower power, including mW level, radioisotope power sources. These power sources have the potential to enable such applications as long-lived meteorological or seismological stations distributed across planetary surfaces, surface probes, deep space micro-spacecraft and sub-satellites, terrestrial sensors, transmitters, and micro-electromechanical systems. The power requirements are in the range of 1 mW to several hundred mW. The primary technical requirements for space applications are long life, high reliability, high specific power, and high power density, and those for some special military uses are very high power density, specific power, reliability, low radiological induced degradation, and very low radiation leakage. Thermoelectric conversion is of particular interest because of its technological maturity and proven reliability. This paper summarizes the thermoelectric, thermal, and radioisotope heat source designs and presents the corresponding performance for a number of mW size thermoelectric micro isotope power sources

  12. Non-linear multi-objective model for planning water-energy modes of Novosibirsk Hydro Power Plant

    Science.gov (United States)

    Alsova, O. K.; Artamonova, A. V.

    2018-05-01

    This paper presents a non-linear multi-objective model for planning and optimizing of water-energy modes for the Novosibirsk Hydro Power Plant (HPP) operation. There is a very important problem of developing a strategy to improve the scheme of water-power modes and ensure the effective operation of hydropower plants. It is necessary to determine the methods and criteria for the optimal distribution of water resources, to develop a set of models and to apply them to the software implementation of a DSS (decision-support system) for managing Novosibirsk HPP modes. One of the possible versions of the model is presented and investigated in this paper. Experimental study of the model has been carried out with 2017 data and the task of ten-day period planning from April to July (only 12 ten-day periods) was solved.

  13. Possibilities for construction of small hydroelectric power plants in the Republic of Bulgaria

    International Nuclear Information System (INIS)

    Iliev, S.; Angelov, M.; Stojkov, S.; Lefterov, B.

    2001-01-01

    The hydroenergy potential of Bulgaria and its utilization until 2000 is discussed. An assessment is made of the possibilities of the use of additional micro-hydroenergy potential (the preliminary evaluation gives about 1.3 bill. kWh/y with total power 250 MW). In the National Strategy for the development, use and preservation of water in Bulgaria till 2020 it is envisioned 60 micro HPP with power of 36 MW power to be constructed. The Program for hydro energy to 2010 envisioned including of private investments if the construction, buying up the electric energy by the National Electric Company and two-stage construction of the cascade 'Sreden Iskyr' with 10 small NPPs. The necessity of the development of a Manual of express investigation and design of small NPP is substantiated

  14. The 'Alte Ziegelei' small hydro-power installation in Derendingen, Switzerland; Kleinwasserkraftwerk alte Ziegelei in Derendingen. Programm Kleinwasserkraftwerke. Erfahrungs- und Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Koehli, T.

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) discusses the experience gained with a small hydro-power installation in Derendingen, Switzerland. This unique 'micro' installation uses an archimedian screw to produce 6.8 kW of power from a head of 1.15 m and a through-flow of 800 - 1000 litres per second. Optimisation of the project is discussed as are the effects of changing water levels above and below the screw. Winter operation is described and the mounting of gratings necessary to avoid the intake of debris is discussed. Fish-passes are looked at and the effort required for maintenance is compared with that for other types of installations. An accident that occurred is analysed and the results of energy-efficiency measurements made on the installation are presented. The report is rounded off with an evaluation of the plant's performance and a review of future work to be done.

  15. A thermally self-sustained micro-power plant with integrated micro-solid oxide fuel cells, micro-reformer and functional micro-fluidic carrier

    Science.gov (United States)

    Scherrer, Barbara; Evans, Anna; Santis-Alvarez, Alejandro J.; Jiang, Bo; Martynczuk, Julia; Galinski, Henning; Nabavi, Majid; Prestat, Michel; Tölke, René; Bieberle-Hütter, Anja; Poulikakos, Dimos; Muralt, Paul; Niedermann, Philippe; Dommann, Alex; Maeder, Thomas; Heeb, Peter; Straessle, Valentin; Muller, Claude; Gauckler, Ludwig J.

    2014-07-01

    Low temperature micro-solid oxide fuel cell (micro-SOFC) systems are an attractive alternative power source for small-size portable electronic devices due to their high energy efficiency and density. Here, we report on a thermally self-sustainable reformer-micro-SOFC assembly. The device consists of a micro-reformer bonded to a silicon chip containing 30 micro-SOFC membranes and a functional glass carrier with gas channels and screen-printed heaters for start-up. Thermal independence of the device from the externally powered heater is achieved by exothermic reforming reactions above 470 °C. The reforming reaction and the fuel gas flow rate of the n-butane/air gas mixture controls the operation temperature and gas composition on the micro-SOFC membrane. In the temperature range between 505 °C and 570 °C, the gas composition after the micro-reformer consists of 12 vol.% to 28 vol.% H2. An open-circuit voltage of 1.0 V and maximum power density of 47 mW cm-2 at 565 °C is achieved with the on-chip produced hydrogen at the micro-SOFC membranes.

  16. Power Management Based Current Control Technique for Photovoltaic-Battery Assisted Wind-Hydro Hybrid System

    Science.gov (United States)

    Ram Prabhakar, J.; Ragavan, K.

    2013-07-01

    This article proposes new power management based current control strategy for integrated wind-solar-hydro system equipped with battery storage mechanism. In this control technique, an indirect estimation of load current is done, through energy balance model, DC-link voltage control and droop control. This system features simpler energy management strategy and necessitates few power electronic converters, thereby minimizing the cost of the system. The generation-demand (G-D) management diagram is formulated based on the stochastic weather conditions and demand, which would likely moderate the gap between both. The features of management strategy deploying energy balance model include (1) regulating DC-link voltage within specified tolerances, (2) isolated operation without relying on external electric power transmission network, (3) indirect current control of hydro turbine driven induction generator and (4) seamless transition between grid-connected and off-grid operation modes. Furthermore, structuring of the hybrid system with appropriate selection of control variables enables power sharing among each energy conversion systems and battery storage mechanism. By addressing these intricacies, it is viable to regulate the frequency and voltage of the remote network at load end. The performance of the proposed composite scheme is demonstrated through time-domain simulation in MATLAB/Simulink environment.

  17. Renewable energy for professional applications: a guide to implementing off-grid power supplies in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Paish, O.; Oldach, R.

    2002-09-01

    These guidelines are intended to help those considering renewable energy systems to supply power to off-grid applications without access to the UK mains electricity network. The guidelines consider: examples of renewable energy systems used applications with a low power demand in the UK; renewable energy technologies relevant to off-grid applications (solar photovoltaics, wind generators, micro-hydro turbines and hybrid systems); nine steps for project implementation; defining and optimising the load application; estimating energy resources when using solar energy, wind power and hydro power; general rules of thumb when choosing a power source; system components such as batteries, inverters, support structure and civil works; basic system sizing calculations; developing a specification and contacting suppliers; checking equipment, installation and commissioning; legal and other non-technical issues; operating issues such as maintenance and safety; and selected case studies from the UK.

  18. An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost

    International Nuclear Information System (INIS)

    Yuan, Xiaohui; Tian, Hao; Yuan, Yanbin; Huang, Yuehua; Ikram, Rana M.

    2015-01-01

    Highlights: • Multi-objective hydro-thermal-wind scheduling model (MO-HTWS) is establish. • The extra cost in MO-HTWS problem caused by wind uncertainty is considered. • An extended NSGA-III is proposed to solve MO-HTWS problem. • Constraint handling strategies are presented to modify infeasible solutions. • The feasibility and effectiveness of the proposed method is verified by example. - Abstract: Due to the characteristics of clean and renewable, wind power is significant to economic and environmental operation of electric power system so that it attracts more and more attention from researchers. This paper integrates wind power with hydrothermal scheduling to establish multi-objective economic emission hydro-thermal-wind scheduling problem (MO-HTWS) model with considering wind uncertain cost. To solve MO-HTWS problem with various complicated constraints, this paper extends NSGA-III by introducing the dominance relationship criterion based on constraint violation to select new generation. Moreover, the constraint handling strategy which repairs the infeasible solutions by modifying the decision variables in feasible zone according to the violation amount is proposed. Finally, a daily scheduling example of hydro-thermal-wind system is used to test the ability of NSGA-III for solving MO-HTWS problem. It is concluded from the superior quality and good distribution of the Pareto optimal solutions that, NSGA-III can offer an efficient alternative for optimizing MO-HTWS problem

  19. Optimal operation of a pumped-storage hydro plant that compensates the imbalances of a wind power producer

    OpenAIRE

    Duque, Álvaro Jaramillo; Castronuovo, Edgardo D.; Sánchez, Ismael; Usaola, Julio

    2011-01-01

    The participation of wind energy in electricity markets requires providing a forecast for future energy production of a wind generator, whose value will be its scheduled energy. Deviations from this schedule because of prediction errors could imply the payment of imbalance costs. In order to decrease these costs, a joint operation between a wind farm and a hydro-pump plant is proposed; the hydro-pump plant changes its production to compensate wind power prediction errors. In order to optimize...

  20. Fifteen years of radioactive waste management at Ontario Hydro

    International Nuclear Information System (INIS)

    Carter, T.J.; Rao, P.K.M.

    1985-01-01

    Ontario Hydro is a large Canadian utility producing 84% (7394 MWe) of the Nuclear Electricity generated in Canada. The low- and intermediate-level radioactive wastes generated by the Ontario Hydro program are currently being managed at the Bruce Nuclear Power Development with various volume reduction, packaging and interim storage systems. Ontario Hydro also owns and operates a radioactive waste transportation system. Studies are in progress for final disposal of these wastes in a suitable geology in Ontario. Since its inception in 1971, Ontario Hydro's radioactive waste management program has evolved into providing a full fledged radioactive waste management capability to the utility's two nuclear generation centres at Pickering and Bruce, and later in the decade, to Darlington. This paper summarizes the various developments in this program; highlights the major facilities both in-service and planned to be built; reviews the experiences gained over fifteen years of in-house waste management; and discusses the proposed reorientation towards ultimate disposal of these wastes. 2 refs., 8 figs., 1 tab

  1. Architecture at Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  2. Effect of finite heat input on the power performance of micro heat engines

    International Nuclear Information System (INIS)

    Khu, Kerwin; Jiang, Liudi; Markvart, Tom

    2011-01-01

    Micro heat engines have attracted considerable interest in recent years for their potential exploitation as micro power sources in microsystems and portable devices. Thermodynamic modeling can predict the theoretical performance that can be potentially achieved by micro heat engine designs. An appropriate model can not only provide key information at the design stage but also indicate the potential room for improvement in existing micro heat engines. However, there are few models reported to date which are suitable for evaluating the power performance of micro heat engines. This paper presents a new thermodynamic model for determining the theoretical limit of power performance of micro heat engines with consideration to finite heat input and heat leakage. By matching the model components to those of a representative heat engine layout, the theoretical power, power density, and thermal efficiency achievable for a micro heat engine can be obtained for a given set of design parameters. The effects of key design parameters such as length and thermal conductivity of the engine material on these theoretical outputs are also investigated. Possible trade-offs among these performance objectives are discussed. Performance results derived from the developed model are compared with those of a working micro heat engine (P3) as an example. -- Highlights: → Thermodynamic model for micro heat engines. → Effect of different parameters on potential performance. → Tradeoffs for determining optimal size of micro engines.

  3. Hydro One 2002 annual report

    International Nuclear Information System (INIS)

    2003-01-01

    Financial information from Hydro One was presented and a review of its 2002 operations was made available for the benefit of shareholders. Hydro One is the largest electricity delivery company in Ontario and one of the largest in North America. It began operation in 1999 after Ontario Hydro restructured its delivery and generation entities. Hydro One now includes power transmission, power distribution and telecom, with transmission and distribution operations representing 99 per cent of its business. This report indicates that in 2002, the utility had strong financial performance with $344 million in net income. The utility met its health and safety targets, and established a customer advisory board to improve customer satisfaction. A layer of management at the executive level was eliminated to stream-line decision-making and enhance productivity. The electricity network was upgraded and maintained through $546 million in capital expenditures. Non-core functions were sold to ensure a better focus on the core business of electricity delivery. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Hydro One and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  4. Development of a low energy micro sheet forming machine

    Science.gov (United States)

    Razali, A. R.; Ann, C. T.; Shariff, H. M.; Kasim, N. I.; Musa, M. A.; Ahmad, A. F.

    2017-10-01

    It is expected that with the miniaturization of materials being processed, energy consumption is also being `miniaturized' proportionally. The focus of this study was to design a low energy micro-sheet-forming machine for thin sheet metal application and fabricate a low direct current powered micro-sheet-forming machine. A prototype of low energy system for a micro-sheet-forming machine which includes mechanical and electronic elements was developed. The machine was tested for its performance in terms of natural frequency, punching forces, punching speed and capability, energy consumption (single punch and frequency-time based). Based on the experiments, the machine can do 600 stroke per minute and the process is unaffected by the machine's natural frequency. It was also found that sub-Joule of power was required for a single stroke of punching/blanking process. Up to 100micron thick carbon steel shim was successfully tested and punched. It concludes that low power forming machine is feasible to be developed and be used to replace high powered machineries to form micro-products/parts.

  5. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  6. The political economy of Canadian hydro-electricity : between old provincial hydros and neoliberal regional energy regimes

    International Nuclear Information System (INIS)

    Netherton, A.

    2007-01-01

    In economic terms, hydro-electricity is considered as a quasi-staple, as it prone to the classic staples problem of excess capacity. However, neither water nor hydroelectricity in Canada is produced primarily for export markets. Hydroelectric systems are often thought of as politicized monopolies. This paper discussed changes that have occurred in hydroelectric organizations over time, as they have been governed by a formative mixed regime; postwar provincial hydro systems; a megaprojects regime; and an emerging sustainability regionalization regime. The origins of electricity generation and transmission in Canada were discussed, as well as the ecological footprint of large mega-projects on rivers. The development of provincial hydro monopolies during the mid- to late- twentieth century was also outlined, as well as the sustainability and regionalization regime that developed after 1990. During the mature staples period of the mid-century, rents in hydro-electric organizations were distributed through cheap rates to subsidize and facilitate the development of mass production and mass consumption. However, post-staples consumption has now replaced mass consumption, and demand side management is replacing earlier cheap power policies. Nonetheless, the lack of systematic integration of networks has led to inefficiencies. Provincial grids are now being integrated into interconnected North American regional networks regulated by the United States. It was concluded that the Canadian electricity regime is increasingly influenced by the the supranational role that the United States is playing in structuring markets. 83 refs

  7. BC Hydro triple bottom line report 2002

    International Nuclear Information System (INIS)

    Anon

    2002-08-01

    British Columbia Hydro (BC Hydro) published this document which measures the environmental, social and economic performance of the company. It is a complement to BC Hydro's 2002 Annual Report. The report was prepared to better understand the company's business in terms of its commitment to being an environmentally, socially, and economically responsible company (the three bottom lines). BC Hydro proved its ability to integrate the three bottom lines in decision making processes by carefully examining the environmental, social and economical impacts of programs such as Power Smart, Green and Alternative Energy, and Water Use Planning. All indicators point to BC Hydro achieving its commitment of providing a minimum of 10 per cent of new demand through 2010 with new green energy sources. Water Use Plans were developed for hydroelectric generating stations, and they should all be in place by 2003. Efficiencies realised through the Power Smart program offset the increases in greenhouse gas associated with increased energy demand. Juvenile sturgeon raised in a hatchery were released into the Columbia River in May 2002. The completion of a 40-kilometre trail on the Sunshine Coast was helped by a financial contribution from BC Hydro in the amount of 23,000 dollars. Safety improvements were implemented at eight facilities, such as dam remediation, dam surveillance and instrumentation updates. Scholarships were awarded across the province, along with additional donations to non-profit organizations. Co-op positions were provided for 150 students. Internal energy efficiency programs were successful. Planning is under way for significant maintenance work and equipment replacement projects as the transmission and distribution infrastructure ages. The number of reported indicators was expanded this year. In turn, they were aligned with the revised Global Reporting Initiative (GRI) guidelines. tabs

  8. Development of HydroImage, A User Friendly Hydrogeophysical Characterization Software

    Energy Technology Data Exchange (ETDEWEB)

    Mok, Chin Man [GSI Environmental; Hubbard, Susan [Lawrence Berkeley National Laboratory; Chen, Jinsong [Lawrence Berkeley National Laboratory; Suribhatla, Raghu [AMEC E& I; Kaback, Dawn Samara [AMEC E& I

    2014-01-29

    HydroImage, user friendly software that utilizes high-resolution geophysical data for estimating hydrogeological parameters in subsurface strate, was developed under this grant. HydroImage runs on a personal computer platform to promote broad use by hydrogeologists to further understanding of subsurface processes that govern contaminant fate, transport, and remediation. The unique software provides estimates of hydrogeological properties over continuous volumes of the subsurface, whereas previous approaches only allow estimation of point locations. thus, this unique tool can be used to significantly enhance site conceptual models and improve design and operation of remediation systems. The HydroImage technical approach uses statistical models to integrate geophysical data with borehole geological data and hydrological measurements to produce hydrogeological parameter estimates as 2-D or 3-D images.

  9. The dual hydro x nuclear power plants

    International Nuclear Information System (INIS)

    Borges, J.C.

    1984-01-01

    An our daily life in modern society becomes more and more dependent on electricity, supply of this kind of energy should not only be a part of a global energy policy, but also lay down rigorous criteria to garanty the market supply. Planning actions of the electrical sector are more sensitive to unforseen events, either to brief interruptions in energy supply or to non-equilibrium at any time of the excess of supply over demand. In this way, the cost factor although basic, does not lead to optimal solutions in decisions which involve options between different technologies and energy sources to generate electricity. In this paper, we analyse the above situation in the case of deciding between utilization of nuclear or hydro power plants to supply the Brazilian demande for electricity. Our final objective was the search for parameters which could lead us to better identify and understand the adroitness and mistakes of the Brazilian Nuclear Program. (Author) [pt

  10. Hydro adventurers

    International Nuclear Information System (INIS)

    Wood, Janet

    2000-01-01

    Some of the changes brought about by privatisation of the hydroelectric power industry in Ecuador are discussed. At present, about 25% of the population has no electricity supply; in the remaining areas demand is increasing. Seven new facilities are presently under discussion and these are described briefly. A plant at Abitugua is to be developed as a 'merchant plant' and the meaning and implications of this are described in detail. The present financing programme for Abituaga and an alternative financing programme are detailed. By 2010, some 40% of Ecuador's electricity is expected to come from hydro

  11. Fixing hydro - The forgotten renewable

    International Nuclear Information System (INIS)

    Nalder, N.

    1992-01-01

    Since the dawn of civilization, man has captured the energy potential of falling water, from the water wheels in the fertile crescent of ancient times to today's highly sophisticated conventional and pumped storage projects. As we approach the 21st century, electric energy captured from falling water provides 2.0 trillion kilowatt-hours (21.23 quadrillion Btu), roughly 20% of the world's electric energy. Of the 2.56 billion kilowatts of the world's installed electric generating capacity, hydropower accounts for 24%. Between 1980 and 1989, world generation of hydroelectric power rose from 1.7 trillion kWh to 2.0 trillion kWh. As of January 1, 1988, the US has 90.5 million kW of installed hydro capacity - 70.8 million kW of it under license by the Federal Energy Regulatory Commission - with annual generation estimated at just under 300 billion kWh. Hydro's share, which not long ago comprised 13% of the nation's total capacity, now is just a 9% share. The US has the option to choose one or another path for hydro. If policy makers are willing to coast on a cushion of cheap natural gas, they will continue to shun hydro and put obstacles in its path. But if they come to regard hydro as an attractive resource - as they did only recently - economically and environmentally, they will encourage more balance in resource policies. Believing that interest in a balanced national resource portfolio will grow, the author reviews the past and suggests a possible future course of reasonable development for hydro. The article concludes with some suggested principles that will be needed if the appropriate balance is to be found

  12. Hydro-Quebec's buyback tariff

    International Nuclear Information System (INIS)

    Richard, J.C.

    1992-01-01

    Hydro-Quebec had an installed electric generation capacity of 25,682 MW in 1990, of which 23,927 MW was hydraulic. Of the 26 thermal power plants, 22 are in remote communities on islands or in the north part of the province. The utility's development plan predicts an annual growth in demand of 2.6% to reach ca 200 TWh in 2006; this demand would be reduced to ca 180 TWh by energy efficiency measures. To increase capacity, Hydro-Quebec can utilize the hydro generation potential of its large rivers, of which 18,000 MW is economically viable, and its small rivers. Of the 10,000 MW theoretical potential of the latter, a large fraction cannot be economically developed under existing conditions. The utility has a policy to purchase energy as a function of the price of fossil fuel. For wind energy, this price was 4.22 cents/kWh in 1991; this price will be increased annually according to the inflation index. In its isolated sites such as the Magdalen Islands, current costs of diesel-generated electricity are at least 5.5 cents/kWh. There are possibilities for installing wind plants in isolated regions but their automatic control systems need to be improved for achieving a larger utilization factor relative to diesel generation and their cost needs to be reduced. 1 tab

  13. Graphene-based in-plane micro-supercapacitors with high power and energy densities.

    Science.gov (United States)

    Wu, Zhong-Shuai; Parvez, Khaled; Feng, Xinliang; Müllen, Klaus

    2013-01-01

    Micro-supercapacitors are important on-chip micro-power sources for miniaturized electronic devices. Although the performance of micro-supercapacitors has been significantly advanced by fabricating nanostructured materials, developing thin-film manufacture technologies and device architectures, their power or energy densities remain far from those of electrolytic capacitors or lithium thin-film batteries. Here we demonstrate graphene-based in-plane interdigital micro-supercapacitors on arbitrary substrates. The resulting micro-supercapacitors deliver an area capacitance of 80.7 μF cm⁻² and a stack capacitance of 17.9 F cm⁻³. Further, they show a power density of 495 W cm⁻³ that is higher than electrolytic capacitors, and an energy density of 2.5 mWh cm⁻³ that is comparable to lithium thin-film batteries, in association with superior cycling stability. Such microdevices allow for operations at ultrahigh rate up to 1,000 V s⁻¹, three orders of magnitude higher than that of conventional supercapacitors. Micro-supercapacitors with an in-plane geometry have great promise for numerous miniaturized or flexible electronic applications.

  14. Graphene-based in-plane micro-supercapacitors with high power and energy densities

    Science.gov (United States)

    Wu, Zhong–Shuai; Parvez, Khaled; Feng, Xinliang; Müllen, Klaus

    2013-01-01

    Micro-supercapacitors are important on-chip micro-power sources for miniaturized electronic devices. Although the performance of micro-supercapacitors has been significantly advanced by fabricating nanostructured materials, developing thin-film manufacture technologies and device architectures, their power or energy densities remain far from those of electrolytic capacitors or lithium thin-film batteries. Here we demonstrate graphene-based in-plane interdigital micro-supercapacitors on arbitrary substrates. The resulting micro-supercapacitors deliver an area capacitance of 80.7 μF cm−2 and a stack capacitance of 17.9 F cm−3. Further, they show a power density of 495 W cm−3 that is higher than electrolytic capacitors, and an energy density of 2.5 mWh cm−3 that is comparable to lithium thin-film batteries, in association with superior cycling stability. Such microdevices allow for operations at ultrahigh rate up to 1,000 V s−1, three orders of magnitude higher than that of conventional supercapacitors. Micro-supercapacitors with an in-plane geometry have great promise for numerous miniaturized or flexible electronic applications. PMID:24042088

  15. Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

    Energy Technology Data Exchange (ETDEWEB)

    Duran, Felicia Angelica [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Security Systems Analysis Dept.; Waymire, Russell L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Security Systems Analysis Dept.

    2013-10-01

    Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

  16. Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

    International Nuclear Information System (INIS)

    Duran, Felicia Angelica; Waymire, Russell L.

    2013-01-01

    Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

  17. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  18. A novel power source for high-precision, highly efficient micro w-EDM

    International Nuclear Information System (INIS)

    Chen, Shun-Tong; Chen, Chi-Hung

    2015-01-01

    The study presents the development of a novel power source for high-precision, highly efficient machining of micropart microstructures using micro wire electrical discharge machining (w-EDM). A novel power source based on a pluri resistance–capacitance (pRC) circuit that can generate a high-frequency, high-peak current with a short pulse train is proposed and designed to enhance the performance of micro w-EDM processes. Switching between transistors is precisely controlled in the designed power source to create a high-frequency short-pulse train current. Various microslot cutting tests in both aluminum and copper alloys are conducted. Experimental results demonstrate that the pRC power source creates instant spark erosion resulting in markedly less material for removal, diminishing discharge crater size, and consequently an improved surface finish. A new evaluation approach for spark erosion ability (SEA) to assess the merits of micro EDM power sources is also proposed. In addition to increasing the speed of micro w-EDM by increasing wire feed rates by 1.6 times the original feed rate, the power source is more appropriate for machining micropart microstructures since there is less thermal breaking. Satisfactory cutting of an elaborate miniature hook-shaped structure and a high-aspect ratio microstructure with a squared-pillar array also reveal that the developed pRC power source is effective, and should be very useful in the manufacture of intricate microparts. (paper)

  19. Liquid assets: factors contributing to the development of small hydro in China

    International Nuclear Information System (INIS)

    Pan, D.

    2006-01-01

    The rapid growth of small hydro capacity in China is reviewed. At present, the annual generation from rural small hydropower in China equates with the saving of 44 million tonnes of coal, or the emission of 110 million tonnes of carbon dioxide. Other environmental advantages such as a reduction in wood burning, reduced logging and therefore reduced soil erosion, are mentioned. Energy-starved China stood to gain much from the development of small hydro systems and government policy has been supportive in terms of relatively low tax rates and low interest loans. It is expected that due to the rapid economic growth in China, small-scale hydro will maintain its present level of development and continue to be promoted in a sound and rational manner. (author)

  20. Development of a hydro kinetic river turbine with simulation and operational measurement results in comparison

    International Nuclear Information System (INIS)

    Ruopp, A; Ruprecht, A; Riedelbauch, S; Arnaud, G; Hamad, I

    2014-01-01

    The development of a hydro-kinetic prototype was shown including the compound structure, guide vanes, runner blades and a draft tube section with a steeply sloping, short spoiler. The design process of the hydrodynamic layout was split into three major steps. First the compound and the draft tube section was designed and the best operating point was identified using porous media as replacement for the guide vane and runner section (step one). The best operating point and the volume flux as well as the pressure drop was identified and used for the design of the guide vane section and the runner section. Both were designed and simulated independently (step two). In step three, all parts were merged in stationary simulation runs detecting peak power and operational bandwidth. In addition, the full scale demonstrator was installed in August 2010 and measured in the St. Lawrence River in Quebec supporting the average inflow velocity using ADCP (Acoustic Doppler Current Profiler) and the generator power output over the variable rotational speed. Simulation data and measurements are in good agreement. Thus, the presented approach is a suitable way in designing a hydro kinetic turbine

  1. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  2. (Hydro-Quebec) Illustrated vocabulary representing power line transmission and distribution of electric power. 4, maintenance. (Hydro-Quebec) Vocabulaire illustre des lignes aeriennes de transport et de distribution d'electricite. Fascicule 4, entretien

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    This dictionary is intended to help standardize the terminology used among Hydro-Quebec personnel involved with power lines. This volume is concerned with words applicable to power line maintenance, and is arranged in six parts: poles and link sticks, adapters and related tools, safety devices, safety clothing and climbing equipment, measurement and control devices, and techniques. Virtually all of the terms are illustrated. English language equivalents are given, but these are not standardized terms and are included for informative purposes only. English and French indexes are included. 184 refs., 256 figs.

  3. Development of coal hydro gasification technology

    International Nuclear Information System (INIS)

    Itoh, Kazuo; Nomura, Kazuo; Asaoka, Yoshikiyo; Kato, Shojiro; Seo, Tomoyuki

    1997-01-01

    Taking a potential future decrease in natural gas supply into consideration, we are looking for a way to secure a stable supply of high quality substitute natural gas made from coal (which occurs abundantly throughout the world) in large volumes at low cost. We are working towards our goal of commercializing coal hydro gasification technology in the 2010's and have started developing elemental technology from FY, 1996 as a part of the governmental new energy program. (au)

  4. Some impacts and mitigations for small hydro developments in Newfoundland and Labrador

    International Nuclear Information System (INIS)

    Buchanan, R.

    1993-01-01

    Potential adverse impacts of small hydro power plants were defined and some of the mitigative techniques that can be used to eliminate or alleviate these impacts were outlined. Potential adverse impacts involved in the construction of hydro projects were identified as those associated with construction of dams, borrow areas, access roads, powerhouses, canals, penstocks, and transmission lines. Fish passage and fish habitat maintenance were also among the major issues that confront most of the proposed small hydro projects in Newfoundland. Fish passage and habitat issues received particular attention in view of their obvious importance in a province where fishing is a way of life for large segments of the population. Major challenges included both upstream and downstream fish passage, and maintenance flows downstream of dams. Upstream migration could be facilitated by fishways. Downstream migration of Atlantic salmon smolts was said to be more problematic, but could be addressed by strategies such as intake design, screens, bypasses, sluices, turbine selection, plant shutdowns at critical times and operation of turbines at peak efficiencies. 12 refs., 2 tabs

  5. Hydropower projects financing through the public private partnership a future powered by hydro

    International Nuclear Information System (INIS)

    Oprea, Traian; Teleanu, Mihai; Dobrescu, Dan

    2004-01-01

    /////In the frame of economy type that characterized Romania before 1990, the infrastructure and public utilities development, from which the hydropower sector is integral part, was ensured from public funds. The power generation belongs to the public services, which make profits on an average or long terms, in the benefit of the society. The demand for these services is increasing because of both economical increasing and the private sector weight in economy increasing. But, the quality increasing of these services needs investments, that is access to the long-term loans. Romanian banks are not prepared for long-run loans, and the international agencies don't have sufficient investment funds for all necessary projects. One of the options is or, could be, the transfer of entirely responsibility for infrastructure in the private sector hands, but this is not feasible in many cases. For this reason the government can choose a middle way realizing a private public partnership for solving the problem of the investment funds. In a general manner, this scenario consists in the fact of appealing to the private sector to finance, build and operate, for a limited period, an infrastructure, power or tourism project, necessary to the development. The impact zone between the public sector interest and private sector interest defined the concept of 'private public partnership' in its multiple alternatives (BOT, BOO, BOOT, ROT, etc.). The first official mentioning of a project in private public development under the name of BOOT 'Build, Own, Operate, Transfer' has been used in Turkey, in 1984, by the prime-minister ever since, Turgut Ozal, as part of a huge development program through the privatization in the power sector, infrastructure and tourism. The 'private public partnership' concept was studied and promoted, beginning with '95 years by the European Community too, with the view of this financing model utilization to the infrastructure projects development. One of the most

  6. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction

  7. Modelling and control synthesis of a micro-combined heat and power interface for a concentrating solar power system in off-grid rural power applications

    Science.gov (United States)

    Prinsloo, Gerro; Dobson, Robert; Brent, Alan; Mammoli, Andrea

    2016-05-01

    Concentrating solar power co-generation systems have been identified as potential stand-alone solar energy supply solutions in remote rural energy applications. This study describes the modelling and synthesis of a combined heat and power Stirling CSP system in order to evaluate its potential performance in small off-grid rural village applications in Africa. This Stirling micro-Combined Heat and Power (micro-CHP) system has a 1 kW electric capacity, with 3 kW of thermal generation capacity which is produced as waste heat recovered from the solar power generation process. As part of the development of an intelligent microgrid control and distribution solution, the Trinum micro-CHP system and other co-generation systems are systematically being modelled on the TRNSYS simulation platform. This paper describes the modelling and simulation of the Trinum micro-CHP configuration on TRNSYS as part of the process to develop the control automation solution for the smart rural microgrid in which the Trinum will serve as a solar powerpack. The results present simulated performance outputs for the Trinum micro-CHP system for a number of remote rural locations in Africa computed from real-time TRNSYS solar irradiation and weather data (yearly, monthly, daily) for the relevant locations. The focus of this paper is on the parametric modelling of the Trinum Stirling micro-CHP system, with specific reference to this system as a TRNSYS functional block in the microgrid simulation. The model is used to forecast the solar energy harvesting potential of the Trinum micro-CHP unit at a number of remote rural sites in Africa.

  8. High-frequency micro-machined power inductors

    International Nuclear Information System (INIS)

    Wang, N.; O'Donnell, T.; Roy, S.; Brunet, M.; McCloskey, P.; O'Mathuna, S.C.

    2005-01-01

    Power inductors have been fabricated on silicon substrates using low-temperature IC compatible processes. The electrical properties of these micro-inductors have been measured and discussed. A maximum quality factor of 6 at 4 MHz has been achieved with an inductance value of about 160 nH. The DC saturation currents of the non-gapped and gapped inductors are ∼500 and 700 mA, respectively. The relatively high Q factor and the load current characteristics allow these micro-machined inductors to be used in integrated power converters

  9. Hydro-Quebec proudly celebrates 50 years of service

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The history of the electric utility Hydro-Quebec is reviewed from its creation in 1944 as the Hydroelectric Commission of Quebec. The utility inherited an installed capacity of 696 MW and it first went about standardizing electricity supply conditions and establishing equal rates in the Montreal area. It began major construction projects in the mid-1950s with the Bersimis and Carillon hydroelectric plants. By 1962, installed capacity reached 3,657 MW. In 1963, Hydro-Quebec bought 10 private electricity distribution companies, 45 cooperatives, and a series of private or municipal systems. In 1965, the utility commissioned the world's first 735-kV transmission line. In 1967, Hydro-Quebec opened its research institute, and another laboratory specializing in electrotechnologies was opened in 1987. The 1970s were noted for the James Bay hydroelectric projects, the development of which was eventually governed by the landmark James Bay and Northern Quebec Agreement of 1975. Electricity exports greatly expanded in the 1970s and early 1980s as larger hydroelectric projects came on stream. Challenges of the 1990s include service quality, environmental issues, energy efficiency, and conservation. Hydro-Quebec's Energy Efficiency Project has a target of annual savings of 9.3 TWh by the year 2000. Energy efficiency and power system upgrading are priorities for serving future customer needs. Hydro-Quebec continues to promote hydroelectric power as the cheapest, most environmentally benign form of energy and future generating stations in progress include phase II of the LaGrande complex (to be completed 1996). 2 figs

  10. A Simplified Control Method for Tie-Line Power of DC Micro-Grid

    OpenAIRE

    Yanbo Che; Jinhuan Zhou; Tingjun Lin; Wenxun Li; Jianmei Xu

    2018-01-01

    Compared with the AC micro-grid, the DC micro-grid has low energy loss and no issues of frequency stability, which makes it more accessible for distributed energy. Thus, the DC micro-grid has good potential for development. A variety of renewable energy is included in the DC micro-grid, which is easily affected by the environment, causing fluctuation of the DC voltage. For grid-connected DC micro-grid with droop control strategy, the tie-line power is affected by fluctuations in the DC voltag...

  11. The design and performance of the first fully automatic non-grid 5 MW multi-diesel / mini hydro / battery converter power stations

    International Nuclear Information System (INIS)

    Ahmad Shadzli Abdul Wahab

    2000-01-01

    biggest system is the 5 MW diesel/minihydro stations in Sabah, Malaysia. This technology had brought about radical transformation in the ways remote diesel stations are operated and maintained not only in alleviating environmental damages related to diesel generation but also in improving the occupational health and safety of diesel engines operators. This paper discusses the installation of IPS technology in a local electricity grid powered by multi diesel sets and mini hydro machines, in Ranau/Kundasang, Sabah. The drastic system improvement and significant cost savings the system have entailed, have convinced the electric utility of its effectiveness and reliability. Finally, we believe strongly that IPS technology will pave way for modernisation of diesel-based remote power generating station in Malaysia, and elsewhere in other developing countries. (Author)

  12. New avenues in cobalt-60 production at Ontario Hydro

    International Nuclear Information System (INIS)

    Mylvaganam, C.K.; Ronchka, R.A.

    1990-01-01

    Ontario Hydro produces cobalt-60 in the control rods of twelve power reactors. These reactors have a typical flux of 2 x 10 14 neutrons/cm 2 /s, making them efficient producers of cobalt-60. Current annual production is 45 million curies. Since the primary function of these reactors is the production of electricity, their flexibility to meet the needs of commercial cobalt production by the control rod route is limited. Ontario Hydro is therefore developing innovative production techniques, making use of the CANDU reactor's unique ability to be fuelled on-power. These techniques will enable production to better respond to the market's requirements for quantity and specific activity. As it is supplementary to control rod production, annual supply could potentially reach 165 million curies. (author)

  13. Optimal hydro scheduling and offering strategies considering price uncertainty and risk management

    International Nuclear Information System (INIS)

    Catalão, J.P.S.; Pousinho, H.M.I.; Contreras, J.

    2012-01-01

    Hydro energy represents a priority in the energy policy of Portugal, with the aim of decreasing the dependence on fossil fuels. In this context, optimal hydro scheduling acquires added significance in moving towards a sustainable environment. A mixed-integer nonlinear programming approach is considered to enable optimal hydro scheduling for the short-term time horizon, including the effect of head on power production, start-up costs related to the units, multiple regions of operation, and constraints on discharge variation. As new contributions to the field, market uncertainty is introduced in the model via price scenarios and risk management is included using Conditional Value-at-Risk to limit profit volatility. Moreover, plant scheduling and pool offering by the hydro power producer are simultaneously considered to solve a realistic cascaded hydro system. -- Highlights: ► A mixed-integer nonlinear programming approach is considered for optimal hydro scheduling. ► Market uncertainty is introduced in the model via price scenarios. ► Risk management is included using conditional value-at-risk. ► Plant scheduling and pool offering by the hydro power producer are simultaneously considered. ► A realistic cascaded hydro system is solved.

  14. Fishy Business: Response of Stream Fish Assemblages to Small Hydro-power Plant Induced Flow Alteration in the Western Ghats, Karnataka

    Science.gov (United States)

    Rao, S. T.; Krishnaswamy, J.; Bhalla, R. S.

    2017-12-01

    Alteration of natural flow regimes is considered as a major threat to freshwater fish assemblages as it disturbs the water quality and micro-habitat features of rivers. Small hydro-power (SHP), which is being promoted as a clean and green substitute for large hydro-power generation, alters the natural flow regime of head-water streams by flow diversion and regulation. The effects of altered flow regime on tropical stream fish assemblages, driven by seasonality induced perturbations to water quality and microhabitat parameters are largely understudied. My study examined the potential consequences of flow alteration by SHPs on fish assemblages in two tributaries of the west-flowing Yettinahole River which flows through the reserved forests of Sakleshpur in the Western Ghats of Karnataka. The flow in one of the tributaries followed natural flow regime while the other comprised three regimes: a near-natural flow regime above the dam, rapidly varying discharge below the dam and a dewatered regime caused by flow diversion. The study found that the altered flow regime differed from natural flow regime in terms of water quality, microhabitat heterogeneity and fish assemblage response, each indicative of the type of flow alteration. Fish assemblage in the natural flow regime was characterized by a higher catch per site, a strong association of endemic and trophic specialist species. The flow regime above the dam was found to mimic some components of the natural flow regime, both ecological and environmental. Non endemic, generalist and pool tolerant species were associated with the dewatered regime. There was a lack of strong species-regime association and an overall low catch per site for the flow regulated regime below the dam. This study highlights the consequences of altered flows on the composition of freshwater fish assemblages and portrays the potential of freshwater fish as indicators of the degree and extent of flow alteration. The study recommends the need for

  15. Integrity and life estimation of turbine runner cover in a hydro power plant

    Directory of Open Access Journals (Sweden)

    A. Sedmak

    2016-03-01

    Full Text Available This paper presents integrity and life estimation of turbine runner cover in a vertical pipe turbines, Kaplan 200 MW nominal output power, produced in Russia, and built in six hydro-generation units of hydroelectric power plant „Đerdap 1” in Serbia. Fatigue and corrosion-fatigue interaction have been taken into account using experimentally obtained material properties, as well as analytical and numerical calculations of stress state, to estimate appropriate safety factors. Fatigue crack growth rate, da/dN, was also calculated, indicated that internal defects of circular or elliptical shape, found out by ultrasonic testing, do not affect reliable operation of runner cover.

  16. Workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. Part I

    International Nuclear Information System (INIS)

    1997-01-01

    The publication has been set up as proceedings of the workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. The proceedings consist of the following chapters: (1) BOT schemes as financial model of hydro power projects; (2) Application of pumped storage plants in the control of the Slovak power system and the possibility of pumped storage plant Ipel exploitation towards the year 2010; (3) Use of hydro energetic potential of streams from the aspects of nature conservation on the example of north Slovakia; (4) Ecological aspects of the hydro power industry and possible means to improve ecological conditions of water reservoirs; (5) Preparation and realization of HPP Zilina; (6) Freudenau HPP. ecological measures and groundwater management; (7) Present state of hydro power development in Austria

  17. Micro/Nano Fabricated Solid-State Thermoelectric Generator Devices for Integrated High Voltage Power Sources

    Science.gov (United States)

    Fleurial, J.-P.; Ryan, M. A.; Snyder, G. J.; Huang, C.-K.; Whitacre, J. F.; Patel, J.; Lim, J.; Borshchevsky, A.

    2002-01-01

    Deep space missions have a strong need for compact, high power density, reliable and long life electrical power generation and storage under extreme temperature conditions. Except for electrochemical batteries and solar cells, there are currently no available miniaturized power sources. Conventional power generators devices become inefficient in extreme environments (such as encountered in Mars, Venus or outer planet missions) and rechargeable energy storage devices can only be operated in a narrow temperature range thereby limiting mission duration. The planned development of much smaller spacecrafts incorporating a variety of micro/nanodevices and miniature vehicles will require novel, reliable power technologies. It is also expected that such micro power sources could have a wide range of terrestrial applications, in particular when the limited lifetime and environmental limitations of batteries are key factors. Advanced solid-state thermoelectric combined with radioisotope or waste heat sources and low profile energy storage devices are ideally suited for these applications. The Jet Propulsion Laboratory has been actively pursuing the development of thermoelectric micro/nanodevices that can be fabricated using a combination of electrochemical deposition and integrated circuit processing techniques. Some of the technical challenges associated with these micro/nanodevice concepts, their expected level of performance and experimental fabrication and testing results to date are presented and discussed.

  18. Modelling energy production by small hydro power plants in collective irrigation networks of Calabria (Southern Italy)

    Science.gov (United States)

    Zema, Demetrio Antonio; Nicotra, Angelo; Tamburino, Vincenzo; Marcello Zimbone, Santo

    2017-04-01

    electrical energy sale of about 103000 €. Even though this revenue may appear quite low, it represents an important share of the annual WUA income. For the entire region, the total revenues from recovery energy in collective irrigation networks through SHPPs have been estimated in about 12 million Euros; investment and operating costs have been evaluated by parametric equations and the total profit theoretically available for each WUA has been quantified. This study has shown the economic opportunity of integrating SHPP in existing collecting irrigation networks of WUAs, in view of providing additional economic resources for users and enhancing the exploitation of a renewable energy source. REFERENCE Zema D.A., Nicotra A., Tamburino V., Zimbone S.M. 2016. A simple method to evaluate the technical and economic feasibility of micro hydro power plants in existing irrigation systems. Renewable Energy 85, 498-506. DOI: 10.1016/j.renene.2015.06.066.

  19. Human Resource Development for Nuclear Power Programme in Uganda

    International Nuclear Information System (INIS)

    Henry, Ovona

    2014-01-01

    Conclusions: Despite the effort by the Government to ensure reliable and available access to electricity which is crucial to the socio – economic development, the use of hydro power, biomass and oil, geothermal and peat alone would not meet the target of the vision 2040. There is need to identifies nuclear energy as a potential option for meeting the energy deficit. Development of nuclear energy for power generation needs decision making, preparation and preparatory work which involve human resource development process, strengthening the legislation and regulatory framework, stakeholders’ involvement and public acceptance campaign

  20. Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China

    Directory of Open Access Journals (Sweden)

    Xinshuo Zhang

    2018-04-01

    Full Text Available How to effectively use clean renewable energy to improve the capacity of the power grid to absorb new energy and optimize the power grid structure has become one of China’s current issues. The Yalong River Wind-PV-Hydro complementary clean energy base was chosen as the research object from which to analyze the output complementarity principle and characteristics of wind farms, photovoltaic power plants, and hydropower stations. Then, an optimization scheduling model was established with the objective of minimizing the amount of abandoned wind and photovoltaic power and maximizing the stored energy in cascade hydropower stations. A Progress Optimality Algorithm (POA was used for the short-term optimal operation of Wind-PV-Hydro combinations. The results show that use of cascaded hydropower storage capacity can compensate for large-scale wind power and photovoltaic power, provide a relatively sustained and stable power supply for the grid. Wind-PV-Hydro complementary operation not only promotes wind power and photovoltaic power consumption but also improves the efficiency of using the original transmission channel of hydropower. This is of great significance to many developing countries in formatting a new green approach, realizing low-carbon power dispatch and trade and promoting regional economic development.

  1. [An implantable micro-device using wireless power transmission for measuring aortic aneurysm sac pressure].

    Science.gov (United States)

    Guo, Xudong; Ge, Bin; Wang, Wenxing

    2013-08-01

    In order to detect endoleaks after endovascular aneurysm repair (EVAR), we developed an implantable micro-device based on wireless power transmission to measure aortic aneurysm sac pressure. The implantable micro-device is composed of a miniature wireless pressure sensor, an energy transmitting coil, a data recorder and a data processing platform. Power transmission without interconnecting wires is performed by a transmitting coil and a receiving coil. The coupling efficiency of wireless power transmission depends on the coupling coefficient between the transmitting coil and the receiving coil. With theoretical analysis and experimental study, we optimized the geometry of the receiving coil to increase the coupling coefficient. In order to keep efficiency balance and satisfy the maximizing conditions, we designed a closed loop power transmission circuit, including a receiving voltage feedback module based on wireless communication. The closed loop improved the stability and reliability of transmission energy. The prototype of the micro-device has been developed and the experiment has been performed. The experiments showed that the micro-device was feasible and valid. For normal operation, the distance between the transmitting coil and the receiving coil is smaller than 8cm. Besides, the distance between the micro-device and the data recorder is within 50cm.

  2. Economic impact of Hydro-Quebec's nuclear activities

    International Nuclear Information System (INIS)

    Emard, R.

    1994-01-01

    Gentilly 2 nuclear power plant has benefited the regions of Becancour and Trois Rivieres, with spin-off at the provincial level. Gentilly 2 is Hydro Quebec's only nuclear plant. Its 675 MW provide nearly 3% of Hydro Quebec's production. Over 664 permanent jobs were created, 70% of them highly specialized and multi-skilled. In 1993, out of C$99 spent, 57.3 were for wages, 16.3 for equipment and supplies (including fuel and heavy water), 18 for professional services provided by AECL and others, and the remainder included fees, permits, contract work, and miscellaneous. Gentilly 2 has fostered technological development and inventions which are used at other CANDU stations. 7 ills

  3. Real-time versus day-ahead market power in a hydro-based electricity market

    OpenAIRE

    Tangerås, Thomas P.; Mauritzen, Johannes

    2014-01-01

    We analyse in a theoretical framework the link between real-time and day-ahead market performance in a hydro-based and imperfectly competitive wholesale electricity market. Theoretical predictions of the model are tested on data from the Nordic power exchange, Nord Pool Spot (NPS).We reject the hypothesis that prices at NPS were at their competitive levels throughout the period under examination. The empirical approach uses equilibrium prices and quantities and does not rely on bid data nor o...

  4. The future role of hydro-electricity in Sub-Saharan Africa

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1989-01-01

    Hydroelectric power currently supplies 56-93% of the electricity requirements of the different geographic areas of Sub-Saharan Africa and accounted for 73% of total requirements in 1980. The continent is richly endowed with hydro resources in all areas, with central Africa possessing the most abundant reserves. Existing installed hydro capacity is 13,500 MW and of the total technical resource of 290,000 MW, some 110,000 MW are estimated to constitute the potential that warrants investigation. The demand for electricity in the region is presently low and growing at 5-10%/y. It is projected to double from 47,000 GWh in 1980 to 110,000-170,000 GWh by the year 2000, and is likely to double again by 2020. Hydro reserves warranting investigation exceed the demand projected for the year 2000 by a ratio of over 3:1 and only 13 countries out of 36 have a ratio less than one. A large proportion of these reserves are estimated to be economic to develop relative to other means of power generation. The development of hydro resources should maintain the proportion of the demand met by hydro in the range of 60-75% well into the 21st century. The existing installed capacity is likely to be increased at the rate of 3,000-5,000 MW per decade to achieve this. Constraints on such increase include the large amounts of capital needed, environmental issues, the need to displace populations affected by flooding, and fluctuations in the oil price which make long-term planning uncertain. 5 refs., 1 fig., 11 tabs

  5. Present status of micro and mini-hydel power plants and biogas plants in Pakistan

    International Nuclear Information System (INIS)

    Hussain, T.

    1997-01-01

    The Government of Pakistan has high priority to develop indigenous energy resources and announced a policy framework and package of incentives to private sector in hydro electric power generation. Hydro electric power in Pakistan has been estimated to be nearly 35,000 MW, whereas only 3330 MW have so far been exploited which constitutes only 15.11% share of the total commercial energy fuel consumption in 1994-95 and 42.7% of total electricity generation. The Government Agency in Pakistan i.e. WAPDA which produced 85.4% electricity generation had found it difficult to implement and run small hydro projects. There are 200 MHP plants were installed with a total capacity of 3,000 KW (3 MW), out of which 160 plants are working with 80% success rate. The selling price is Rs. 3.00 against cost of production is Rs. 0.11 per unit. Biogas is a clean and cheap fuel in the form of gas. The total dung available per day in the rural areas of Pakistan works out between 250-300 million Kg and 1804 million cubic m. of biogas can be produced having economic value of 6.711 billions. During 70's several biogas plants were installed but they have some problems. As regards biogas the production has remained stagnant for the last 5 years or more. There is need for clear governmental priorities and effective use of form biogas. (A.B.)

  6. The Atlin Hydro Project : generation for generations

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, S. [Atlin Tlingit Development Corp., Atlin, BC (Canada)

    2010-07-01

    This presentation documented the step-by-step process by which the Atlin Hydro Project was developed. The Taku River Tlingit First Nation undertook the Atlin project as part of its vision for responsible resource management, sustainable economic development, and cultural revival. The Atlin Community Energy Plan involved an assessment of electricity demand, a 20-year demand projection, energy efficiency recommendations, and an assessment of power supply options such as wind towers, connection to the Yukon power grid, and hydro. The potential impact on fisheries, hydrology, wildlife habitat, roads and bridges, navigable waters and forests, existing rights, and First Nation archaeology were assessed, along with other factors such as hazards and flood control. A hydrology assessment of the Surprise-Pine Drainage Basin was undertaken, and stream-flow measurements were taken near the intake location on Pine Creek. The project comprises a discharge control structure and a fish ladder; an intake and weir on Pine Creek; a penstock pipeline from intake to powerhouse; a powerhouse with a 2.1 MW Pelton turbine generator and a switch yard; and a power line from the powerhouse to the interconnection with the existing grid. The impacts on fisheries, wildlife, and human movement are expected to be minimal. 28 figs., 3 tabs.

  7. Ontario Hydro Research Division annual report 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The Research Division of Ontario Hydro conducts research in the fields of chemistry, civil engineering, electrical engineering, mechanical engineering, metallurgy, and operations. Much of the research has a bearing on the safe, environmentally benign operation of Ontario Hydro's nuclear power plants. Particular emphasis has been placed on nuclear plant component aging and plant life assurance

  8. Development of Manitoba Hydro's public water safety around dams management guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, Dave; McPhail, Gord; Murphy, Shayla; Schellenberg, Gord [KGS Acres, Winnipeg, (Canada); Read, Nick [Manitoba Hydro, Winnipeg, (Canada)

    2010-07-01

    Several drowning fatalities and safety incidents have occurred around dams in Ontario, Manitoba and other jurisdictions in Canada. Following these incidents, Manitoba Hydro implemented several measures to improve public safety around its dams with the development of a warning signs manual. Manitoba Hydro found that a standard centralized approach to the process of improving public safety is better for ensuring compliance and consistency, even though they have safety measures in place. This paper described the process that Manitoba Hydro has followed in developing a formal set of public water safety around dams (PWSD) guidelines and a program for implementing these guidelines. This program was developed with the intent of providing a high standard of public protection and continuous improvement and monitoring on par with the effect spent on similar dam safety type programs. This paper focused on the development of the pilot PWSD management plan for Pine Falls generating station in order to test the effectiveness and usability of the guidelines.

  9. Small hydro

    International Nuclear Information System (INIS)

    Bennett, K.; Tung, T.

    1995-01-01

    A small hydro plant in Canada is defined as any project between 1 MW and 15 MW but the international standard is 10 MW. The global market for small hydro development was considered good. There are some 1000 to 2000 MW of generating capacity being added each year. In Canada, growth potential is considered small, primarily in remote areas, but significant growth is anticipated in Eastern Europe, Africa and Asia. Canada with its expertise in engineering, manufacturing and development is considered to have a good chance to take advantage of these growing markets

  10. Optimal bidding in Turkey day ahead electricity market for wind energy and pumped storage hydro power plant

    Directory of Open Access Journals (Sweden)

    Ceyhun Yıldız

    2016-10-01

    Full Text Available In electrical grid; when the demand power increases energy prices increase, when the demand decreases energy prices decrease. For this reason; to increase the total daily income, it is required to shift generations to the hours that high demand power values occurred. Wind Power Plants (WPP have unstable and uncontrollable generation characteristic. For this reason, energy storage systems are needed to shift the generations of WPPs in time scale. In this study, four wind power plants (WPP which are tied to the Turkish interconnected grid and a pumped hydro storage power plant (PSPP that meets the energy storage requirement of these power plants are investigated in Turkey day ahead energy market. An optimization algorithm is developed using linear programming technique to maximize the day ahead market bids of these plants which are going to generate power together. When incomes and generations of the plants that are operated with optimization strategy is analyzed, it is seen that annual income increased by 2.737% compared with WPPs ‘s alone operation and generations are substantially shifted to the high demand power occurred hours.

  11. Access to realization of small hydroelectric power station in Republic of Macedonia

    International Nuclear Information System (INIS)

    Jakimova Filipovska, Nevenka

    2001-01-01

    In the paper an overview of the small-scale hydroelectric power plants is presented. The categorization groups of small to micro hydroelectric power plants by different countries are given. Also, the evaluation models of the projects for realization the small hydroelectric power plants are analysed. The aim of the paper is to stress the advantages of the small hydro projects and their implementation in Macedonia

  12. Power and hydrogen production from ammonia in a micro-thermophotovoltaic device integrated with a micro-reformer

    International Nuclear Information System (INIS)

    Um, Dong Hyun; Kim, Tae Young; Kwon, Oh Chae

    2014-01-01

    Power and hydrogen (H 2 ) production by burning and reforming ammonia (NH 3 ) in a micro-TPV (microscale-thermophotovoltaic) device integrated with a micro-reformer is studied experimentally. A heat-recirculating micro-emitter with the cyclone and helical adapters that enhance the residence time of fed fuel-air mixtures and uniform burning burns H 2 -added NH 3 -air mixtures. A micro-reformer that converts NH 3 to H 2 using ruthenium as a catalyst surrounds the micro-emitter as a heat source. The micro-reformer is surrounded by a chamber, the inner and outer walls of which have installations of gallium antimonide photovoltaic cells and cooling fins. For the micro-reformer-integrated micro-TPV device the maximum overall efficiency of 8.1% with electrical power of 4.5 W and the maximum NH 3 conversion rate of 96.0% with the H 2 production rate of 22.6 W (based on lower heating value) are obtained, indicating that the overall efficiency is remarkably enhanced compared with 2.0% when the micro-TPV device operates alone. This supports the potential of improving the overall efficiency of a micro-TPV device through integrating it with a micro-reformer. Also, the feasibility of using NH 3 as a carbon-free fuel for both burning and reforming in practical micro power and H 2 generation devices has been demonstrated. - Highlights: • Performance of micro-TPV device integrated with micro-reformer is evaluated. • Feasibility of using NH 3 –H 2 blends in integrated system has been demonstrated. • Integration with micro-reformer improves performance of micro-TPV device. • Maximum overall efficiency of 8.1% is found compared with 2.0% without integration

  13. Hydro-Quebec 2005 annual report : people with energy

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec generates, transmits and distributes electricity mainly produced by renewable energy sources. Its sole shareholder is the Quebec government. This annual report reviewed the operations of Hydro-Quebec, and provided data on energy sales, production and details of the utility's environmental programs. Information on Hydro-Quebec subsidiaries in 2005 was presented in the following separate sections: Hydro-Quebec Production; Hydro-Quebec TransEnergie; Hydro-Quebec Distribution; Hydro-Quebec Equipement; and the Societe d'energie de la Baie James. In 2005, Hydro-Quebec Distribution signed contracts for an initial block of 990 MW of wind power and issued a tender call for an additional 2000 MW of wind power. A generator balancing service was created and authorized by the Regie de l'energie. Hydro-Quebec customers have achieved energy savings of nearly 450 GWh in 2005. The commissioning of Toulnustouc generating station was achieved 5 months ahead of schedule. The 526 MW facility will generate 2.7 TWh annually. Work at the Chute-Allard and Rapide-des-Coeurs sites has continued, as well as construction at Mercier and Peribonka and Eastmain-1. Income from continuing operations came to $2.25 billion, a $124 million increase that was attributed to a rise in domestic sales and net short-term exports. The income was offset by higher pension expenses, depreciation and amortization, as well as by cost of supply on external markets and financial expenses. All other operating expenses were lower than in 2004. Capital spending for the transmission system reached its highest level since 1997, with $793 million invested, including $336 million to meet growth. Data on the company's financial performance, executive changes and reorganization were provided. Financial statements included a review and analysis of financial transactions, an auditor's report, as well as customary notes to the consolidated financial statement including balance sheets, assets, liabilities and

  14. Study of novel plasma devices generated by high power lasers coupled with a micro-pulse power technology

    International Nuclear Information System (INIS)

    Nishida, A; Chen, Z L; Jin, Z; Kondo, K; Nakagawa, M; Kodama, R; Arima, H; Yoneda, H

    2008-01-01

    The authors have proposed introducing a micro pulse power technology in high power laser plasma experiments to boost up the return current, resulting in efficiently guiding of energetic electrons. High current pulse power generators with a pulse laser trigger system generate high-density plasma that is well conductor. To efficiently guiding by using a micro pulse power, we estimated parameter of a micro pulse power system that is voltage of rise time, current, charging voltage and capacitance

  15. Ontario hydro development program for steam generator waterlancing applications

    International Nuclear Information System (INIS)

    Malaugh, J.

    1992-01-01

    In the early 1980s, Ontario Hydro's main focus on waterlancing applications was in the development of technology for cleaning tubesheet sludge piles. In 1988, when Unit 2 at the Bruce Nuclear Generating Station (BNGS) was derated to 70% of full power due to severely blocked broach plates, high pressure waterlancing was proposed as a short-term solution. Due to the tight geometry that exist in the BNGS SGs (Steam Generator), an innovative approach was needed to deliver high pressure water to the broach hole locations. The initial lances and guides were modelled after a fiber-optic inspection system used for visual measurements of the broach openings. The waterlancing technology that was first developed for cleaning BNGS Unit 2 has evolved considerably since 1988. Both Units 1 and 2 upper broach plates have been successfully cleaned by waterlancing. At Pickering NGS, this technology is being further developed for use in cleaning broach plates and for tubesheet sludge lancing. This paper describes the development of the waterlance from the initial low pressure stainless steel lances to the current high pressure 'kevlar' lances. The major advances in this technology were borne out of a need to overcome the challenges presented by the SG geometry restrictions and the tenacity of the deposits that were encountered

  16. Power Talk in DC Micro Grids

    DEFF Research Database (Denmark)

    Angjelichinoski, Marko; Stefanovic, Cedomir; Popovski, Petar

    2015-01-01

    Power talk is a novel concept for communication among units in a Micro Grid (MG), where information is sent by using power electronics as modems and the common bus of the MG as a communication medium. The technique is implemented by modifying the droop control parameters from the primary control...

  17. Global warming: a changing climate for hydro

    International Nuclear Information System (INIS)

    Oud, E.

    1993-01-01

    This paper quantifies the benefits attributable to hydroelectric power generation in preventing carbon dioxide emissions from the use of thermal plants. It proposes that utilities and funding agencies consider the societal costs associated with the emission of CO 2 in power system planning. It also suggests that the industrialized countries should consider changing their funding practice and give more appropriate credits for the construction of hydro plants in developing countries, with a view to avoiding the construction and operation of fossil fuelled powerplants. (author)

  18. More than energy: Ontario Hydro final annual report, January 1998 - March 1999

    International Nuclear Information System (INIS)

    1999-01-01

    Ontario Hydro ceased operations on March 31, 1999 and its assets and functions were transferred by provincial statute to two successor corporations: Ontario Power Generation Corp. (OPG) and Ontario Hydro Services Inc. Its functions were also transferred to the Independent Electricity Market Operator and the Electrical Safety Authority, two not-for-profit agencies. The original act defining Ontario Hydro was replaced by the Energy Competition Act, 1998. Until the demerger of the company on April 1, 1999, Ontario Hydro served 108 direct industrial clients, almost one million retail clients and 255 municipal utilities. Ontario Power Generation inherited Ontario Hydro's generating portfolio, making it one of the largest power producers in North America in terms of installed capacity. The OPG system includes 69 hydroelectric stations, three nuclear sites, and six operating fossil fueled stations. Total installed system capacity is approximately 31,000 megawatts, and Ontario Hydro's total sales in 1998 were almost 139 terawatt hours. Ontario Hydro Services Company is an energy services-based transmission and distribution company. It owns and maintains 29,000 km of transmission lines, 114,700 km of distribution lines, 245 km of high-voltage underground cable, 256 transformer stations, 928 distribution and regulation stations, and 250 microwave stations. It also retains the retail business held by Ontario Hydro, which serves over 950,000 clients, and the transmission and generating business for 23 remote communities in Northern Ontario

  19. Hydro-climatic conditions and thermoelectric electricity generation – Part I: Development of models

    International Nuclear Information System (INIS)

    Koch, Hagen; Vögele, Stefan

    2013-01-01

    In recent years there have been several heat waves affecting the use of thermoelectric power plants, e.g. in Europe and the U.S. In this paper the linkage between hydro-climatic conditions and possible electricity generation restrictions is described. The coupling of hydrological models and a power plant model is presented. In this approach each power plant is considered separately with its technical specifications. Also environmental regulations, e.g. permissible rise in the cooling water temperature, are considered for the respective power plant. The hydrological models developed to simulate river runoff and water temperature are also site specific. The approach presented is applied to Krümmel nuclear power plant in Germany. Analysed are the uncertainties with regard to electricity generation restrictions on account of climatic developments and corresponding higher water temperatures and low flows. Overall, increased water temperatures and declining river runoff lead to more frequent and more severe generation restrictions. It is concluded that the site-specific approach is necessary to reliably simulate power plants water demand, river runoff and water temperature. Using a simulation time step of one day, electricity generation restrictions are significantly higher than for simulations at monthly time step. - Highlights: • An approach to assess climate effects on electricity generation is presented. • Site specific models for power plants, water temperature and discharge are used. • Monthly and daily simulation time-steps give different results. • Climate change effects on generation depend on cooling system and climate scenario

  20. The Nothuesli small hydro project

    International Nuclear Information System (INIS)

    Balachandran, S.; Jorde, K.

    2008-01-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  1. Frequency Regulation of a Hybrid Wind–Hydro Power Plant in an Isolated Power System

    Directory of Open Access Journals (Sweden)

    Guillermo Martínez-Lucas

    2018-01-01

    Full Text Available Currently, some small islands with high wind potential are trying to reduce the environmental and economic impact of fossil fuels by using renewable resources. Nevertheless, the characteristics of these renewable resources negatively affect the quality of the electrical energy, causing frequency disturbances, especially in isolated systems. In this study, the combined contribution to frequency regulation of variable speed wind turbines (VSWT and a pump storage hydropower plant (PSHP is analyzed. Different control strategies, using the kinetic energy stored in the VSWT, are studied: inertial, proportional, and their combination. In general, the gains of the VSWT controller for interconnected systems proposed in the literature are not adequate for isolated systems. Therefore, a methodology to adjust the controllers, based on exhaustive searches, is proposed for each of the control strategies. The control strategies and methodology have been applied to a hybrid wind–hydro power plant on El Hierro Island in the Canary archipelago. At present, in this isolated power system, frequency regulation is only provided by the PSHP and diesel generators. The improvements in the quality of frequency regulation, including the VSWT contribution, have been proven based on simulating different events related to wind speed, or variations in the power demand.

  2. 77 FR 47622 - TransCanada Hydro Northeast Inc.; FirstLight Power Resources; Notice of Environmental Site Review

    Science.gov (United States)

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1892-000 New Hampshire-Vermont; Project No. 1855-000 New Hampshire-Vermont; Project No. 1904-000 New Hampshire-Vermont; Project No. 2485-000 Massachusetts; Project No. 1889-000 Massachusetts] TransCanada Hydro Northeast Inc.; FirstLight Power Resources; Notice of Environmenta...

  3. Implementation of a micro hydropower supply scheme in the Kwazulu-Natal Drakensberg

    International Nuclear Information System (INIS)

    Dooge, G.R.

    1997-01-01

    Eskom has implemented a 5 kW micro hydropower supply scheme in the Kwazulu-Natal Drakensberg. The scheme supplies electrical power to five schools using a Single Wire Earth Return (SWER) transmission line. This paper describes the implementation of the scheme and covers the social aspects, the mechanical, civil and electrical works, and also scheme economics. The main aim of this project was to obtain experience in the design and implementation of a micro hydro system, both technically and socially, so that the technology could be used with confidence in Eskom's non-grid electrification programme. 5 refs., 3 figs

  4. A new PID controller design for automatic generation control of hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Khodabakhshian, A.; Hooshmand, R. [Electrical Engineering Department, University of Isfahan (Iran)

    2010-06-15

    This paper presents a new robust PID controller for automatic generation control (AGC) of hydro turbine power systems. The method is mainly based on a maximum peak resonance specification that is graphically supported by the Nichols chart. The open-loop frequency response curve is tangent to a specified ellipse and this makes the method to be efficient for controlling the overshoot, the stability and the dynamics of the system. Comparative results of this new load frequency controller with a conventional PI one and also with another PID controller design tested on a multimachine power system show the improvement in system damping remarkably. The region of acceptable performance of the new PID controller covers a wide range of operating and system conditions. (author)

  5. Hydro-Quebec : annual report 1998 : for today and tomorrow

    International Nuclear Information System (INIS)

    1999-01-01

    Hydro-Quebec is a publicly owned company with a single shareholder, the Quebec government. In 1998, the utility had over 31,400 MW in installed capacity, ranking it among North America's largest distributors of electrical energy. This report provides a review of progress and financial highlights including revenue, expenditure, financial expenses, net income, total assets, long term debt, shareholder's equity and the overall financial position of the utility. In 1998 sales totaled 161.4 TWh, with Quebec markets accounting for more than 88 percent and sales, outside Quebec accounting for 11.5 per cent. Three factors related to weather impacted the utility in 1998. The first was mild weather which brought down domestic and agricultural power consumption by 3 TWh compared with the average recorded in the past half-century. The second was low precipitation which caused Hydro-Quebec to turn to means other than hydroelectric generation to supply power to Quebec customers. These included start-up generation of the Tracy thermal generating station, reduction of sales on short-term markets outside Quebec, and electricity purchases on external markets. The third factor was the ice storm of January 1998, which caused significant damage to part of Hydro-Quebec's transmission and distribution systems. Throughout the year, Hydro-Quebec worked in reinforcing its power lines to prevent repetition of the devastation that occurred during the ice storm. In spite of the events of January 1998, the Utility remains committed to the growth and profitability orientations laid out in its Strategic Plan for 1998-2002. Significant progress was made in consolidating the Utility's position in international markets. Productive partnerships have been established with the Quebec Federation of Labour Solidarity Fund, and with Gaz de France. A network of international partners in a score of countries also has been developed. Hydro-Quebec has completed most of its preparations for Year 2000 readiness

  6. Rebuilding the Chalberhoeni small hydro power station in Saanen, Switzerland; Chalberhoeni - Rapport Final

    Energy Technology Data Exchange (ETDEWEB)

    Cavin, G. [Stucky SA, Renens (Switzerland); Wagner, T. [Sigmaplan, Berne (Switzerland)

    2009-07-01

    These two final illustrated reports for the Swiss Federal Office of Energy (SFOE) deal with various aspects of the Chalberhoeni small hydro project in Saanen, Switzerland. The first report presents data on the catchment area involved, available head, residual water quantities, installed power and annual production figures. Investments and operating costs are looked at. The second report describes the project and discusses regional planning aspects, hydrological basics and environmental issues in connection with the renewal project, including details on invertebrates found in the stream and their relevance to fishing and nature protection issues.

  7. Preliminary study for a drinking-water hydro-power station in Raron, Switzerland; Vorstudie Trinkwasserkraftwerk 'Moos', Gemeinde Raron VS

    Energy Technology Data Exchange (ETDEWEB)

    Loretan, F. [Schneider - Bregy und Partner AG, Raron, (Switzerland); Hiller, B. [Ryser Ingenieure AG, Berne (Switzerland)

    2006-07-01

    This final report for the Small Hydro Programme of the Swiss Federal Office of Energy (SFOE) presents the concept for the augmentation of an existing drinking-water-powered small hydro-electric project with an additional installation that is to use the overflow-water of a reservoir to drive a 75 kW Pelton turbine. The paper discusses the hydraulic situation and describes the installations proposed. Energy production and the costs involved are listed and commented on. Water in drinking-water quality from the Loetschberg railway tunnel is also to be used in the system.

  8. Production method of hydrogen jet plasma process in hydro machinery

    International Nuclear Information System (INIS)

    Amini, F.

    2007-01-01

    The purpose of present paper is to the process of plasma formation in hydro machinery when a hydro turbine operates at various conditions and load rejection. By investigation the power, shock pressure , and impact effects of hydro machinery, it is revealed that energy and hydrogen are generated by the plasma process. The investigation on several turbines of various hydro power plants reveals that cold fusion process in hydro machinery generates hydrogen. The hypothesis concerning the participation of alkaline metals in river water and the atomic nuclei of the runner blade material in the formation of hydrogen are considered. It is possible to assume hydrogen, deuterium, helium, and tritium atoms (based on Dr. Mizuno and Dr. Kanarev theories) that are formed, diffuse into cavitation bubbles. The plasma is generated during the collapse of the bubble; thus, the quantity of burnt hydrogen determine the volume of generating hydrogen and the impact force caused by hydrogen explosion (noise).There are five main notions, which can determine hydrogen and plasma process: (1) turbine power effect, (2) high shock pressure, (3) crack on turbine parts, (4) impacts effects and (4) the lift of rotating parts. The frequency of the excitation lies in a range from 0.786 to 1.095 Hz.In future, it may be possible to design hydro turbines based on the plasma process that generates hydrogen; or there may exist turbines that rotate with a mixture of hydrogen explosion and water energies

  9. Electromechanical coupling in electrostatic micro-power generators

    International Nuclear Information System (INIS)

    Mahmoud, M A E; El-Saadany, E F; Mansour, R R; Abdel-Rahman, E M

    2010-01-01

    Electrostatic micro-power generators (MPGs) are modeled and analyzed with particular emphasis on electromechanical coupling and its impact on the system dynamics. We identify two qualitatively different regimes in the MPG response, dubbed slow and fast. A linearized electromechanically coupled model of an electrostatic MPG and two simplified linear models are used to study the response of the MPG. Linear models are found adequate to represent the dynamic response of fast MPGs but inadequate to represent the response of slow and mixed domain MPGs. A nonlinear model is developed and validated to describe the response of those MPGs under moderately large excitations. On the basis of this analysis, we describe a method and provide design rules for realizing wideband electrostatic MPGs, and develop closed-form formulae for the extracted power for MPGs under moderately large excitations

  10. Electronic Control Of Small Hydro-Generators Part II

    International Nuclear Information System (INIS)

    Diaz B, Pedro; Torres M, Carlos A.

    1994-01-01

    The present project arises for the Colombian population's necessity to overcome the underdevelopment, the poverty, the education and the level of life in rural areas of difficult access, for an economic rural electrification. The UIS, by means of the advisory committee of investigations of the ability of Physical-mechanical Sciences and the ability of Electricity and Electronic, it begins the process of developing in 1991 a study of economic and reliable control for the handling of small micro-centrals. Providing from electric power to the rural sector is a world problem, and have more than enough this some countries (China, Nepal, Peru, The islands of Papua, New Guinea), they have made investigations, outlining and building central micro controlled by microprocessor. The present study is developed with the objective of carrying out a load control that acts reliable and quickly. Traditionally they have been come using mechanical governors, which are those in charge of making the load control by means of valves that regulate the flow of water in the turbines, involving this way big retards characteristic of any mechanical control. In summary, the electronic governor of load presents on the mechanical governor, the advantage of acting to more speed and consequently to maintain stable the frequency of the system. To continue with the study, the objective that this project must develop, is an electronic control of load which presents to a small hydro generator, a relatively constant and independent electric load that the demanded consumption for the user varies from none to full load, given as initial parameters a constant flow in the turbine and a control in the line tension. This way it seeks to improve the energy quality given by isolated generators

  11. The development of biodiversity conservation measures in China's hydro projects: A review.

    Science.gov (United States)

    Bai, Ruiqiao; Liu, Xuehua; Liu, Xiaofei; Liu, Lanmei; Wang, Jianping; Liao, Sihui; Zhu, Annah; Li, Zhouyuan

    2017-11-01

    The hydropower capacity of China ranks first in the world and accounts for approximately 20% of the total energy production in the country. While hydropower has substantially contributed to meeting China's renewable energy targets and providing clean energy to rural areas, the development of hydropower in China has been met with significant controversy. Ecologically, hydro projects alter the landscape, with potential impacts to the country's aquatic biodiversity. Over the past four decades in China, various mainstream opinions and misunderstandings have been presented concerning how to alleviate the negative impacts of hydro projects on aquatic ecosystems. This article reviews research concerning potential mitigation measures to enhance aquatic biodiversity conservation in hydro projects in China. Based on the academic attention such research has attracted, three technical measures for aquatic biodiversity conservation are considered: (1) fish passages, (2) restocking efforts and (3) river and lake renovations. This article provides a historical comparison of these three practices in China to demonstrate the advantages and disadvantages of each method. The article also reviews the relevant legislation, regulations and technical guidelines concerning China's hydro projects dating back to 1979. The dynamics in research, publications, and patents concerning these three mitigation measures are summarized to demonstrate their technological developments in the context of legislative and policy advances. Data were gathered through the China Knowledge Resource Integrated Database and the State Intellectual Property Office of the People's Republic of China. Based on the analysis provided, the article recommends an expansion of China's environmental certification system for hydro projects, more robust regional legislation to bolster the national framework, the cooperation between upstream and downstream conservation mechanisms, and better monitoring to determine the efficacy

  12. The development of the wind power industry in Quebec

    International Nuclear Information System (INIS)

    2006-05-01

    This analysis examined the current situation of wind power development in the province of Quebec and presented a qualitative assessment of the economic repercussions in terms of employment, investments and environmental and social impacts. The development of the wind power industry in Quebec gained momentum in 2003 when the provincial government expressed support for fast growth of wind power. In response, Hydro-Quebec launched an invitation to interested stakeholders to tender for 1000 MW of wind power projects to be installed between 2006 and 2012. The invitation was a great success, with more than 4000 MW of projects filed. The average price of the selected offers was 6.5 cents per kWh for 990 MW in 8 projects. The economic repercussions related to construction of wind farms in the Gaspe was discussed along with indirect and induced economic repercussions for suppliers and subcontractors in the entire province. It was noted that Quebec is already a leader in the field of electricity and wind energy consultation. Stimulated by these successes, the government of Quebec recently raised its target for wind power development to 2,500 MW. Therefore, taking into account the wind developments already supported by Hydro-Quebec, the installed wind capacity in Quebec is expected to reach more than 4000 MW by 2015, with an investment by the wind power industry of more than 5.8 billion dollars. The wind power industry is expected to generate 45,000 direct or indirect jobs for more than a 20 year period. Presently, the government of Quebec supports the establishment of a local wind market to promote free competition, energy diversity, and coexistence of key players. As its international support mechanism, Quebec chose to integrate regional economic development criteria with the price of electricity. In the long term, the wind industry could constitute a key element in Quebec's sustainable energy development plan. 9 refs., 1 tab

  13. The Statoil/Hydro fusion in a continental shelf perspective

    International Nuclear Information System (INIS)

    Osmundsen, Petter

    2007-01-01

    The article analysis the consequences of the Statoil/Hydro merger on the development on the Norwegian continental shelf. Various indicators of results of the market power the merger are presented and the effects of reduced competition on the markets are discussed. The advantages of the merger on the activities on the shelf are analyzed. (tk)

  14. Micro-tubular flame-assisted fuel cells for micro-combined heat and power systems

    Science.gov (United States)

    Milcarek, Ryan J.; Wang, Kang; Falkenstein-Smith, Ryan L.; Ahn, Jeongmin

    2016-02-01

    Currently the role of fuel cells in future power generation is being examined, tested and discussed. However, implementing systems is more difficult because of sealing challenges, slow start-up and complex thermal management and fuel processing. A novel furnace system with a flame-assisted fuel cell is proposed that combines the thermal management and fuel processing systems by utilizing fuel-rich combustion. In addition, the flame-assisted fuel cell furnace is a micro-combined heat and power system, which can produce electricity for homes or businesses, providing resilience during power disruption while still providing heat. A micro-tubular solid oxide fuel cell achieves a significant performance of 430 mW cm-2 operating in a model fuel-rich exhaust stream.

  15. Challenging hydro-hegemony

    DEFF Research Database (Denmark)

    Wessels, Josepha Ivanka

    2015-01-01

    Bank. Both case studies show that control over water resources and supply provides political power over others at local level. Yet non-violent resistance can be observed in these border areas. In border areas between Israel, Syria and Palestine, control over access and water supply plays an important...... role in the ability of Israel to exercise hegemonic power in daily hydro-politics, which in the long term is detrimental for the people and the environment and disrupts the hydrological balance in the entire Jordan River basin....

  16. Small hydro power project operating in cascade; Projeto de pequenas centrais hidreletricas operando em cascata

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Robson Siqueira Filadelfo dos [Minas Gerais Univ., Belo Horizonte (Brazil). Dept. de Engenharia Nuclear; Martinez, Carlos Barreira; Macedo, Alberto Amarante [Minas Gerais Univ., Belo Horizonte (Brazil). Dept. de Engenharia Hidraulica e Recursos Hidricos

    1999-07-01

    Small Hydro Power is a good option of generation mainly when they are located close to the consumers, because they demand smaller absolute value of invested capital and smaller time of maturation. Besides, the great repressed demand, mainly in the schedules of point, and the recovery of the values of the tariffs has been showed to private investor for this type of central. This paper develops a new method that allows to give agility to the study of small hydropower operating in cascade form in order to optimize the cost-benefit relationship of the enterprise. Approaches are presented for the evaluation of this type of system, the methodology of partition of falls and the proposed model. A case study, in which this method is applied, is shown at the end of this work. (author)

  17. Evaluation of neutron flux density and power density with SPN-detectors and micro calorimeters

    International Nuclear Information System (INIS)

    Gehre, G.; Rindelhardt, U.; Seidenkranz, T.; Hogel, J.; Jirousek, V.; Vazek, J.

    1983-02-01

    During investigations with a special equipped fuel assembly in the Rheinsberg nuclear power station the neutron flux and the power density were evaluated from measurements with SPN-detectors and micro calorimeters. The reliability of both detector types, their measurement accuracy under different physical conditions and the usefulness of the developed calculation models are discussed in detail. The thermal flux and the power density evaluated with SPND's agree well with theoretical results. The values obtained through micro calorimeter measurements are systematic lower by about 18%. This deviation is probably a result of differences in the used calculation models. (author)

  18. A long-term optimization method for reservoir management in a market oriented hydro-dominated power systems

    International Nuclear Information System (INIS)

    Sultovic, E.; Sarajcev, I.; Majstrovic, M.

    2001-01-01

    This paper presents an optimization-based method for the long-term scheduling of hydrothermal power system. The proposed method maximizes the profit of hydroelectric production in power system based on monthly energy requirement of the system and unit commitment calculations. The method allows precise hydro chain modeling with numerous restrictions as well as computation for multiple-reservoir river systems with multiple-purpose operation. The method has been implemented in a computer program and tested on power system, which is very similar to Croatian Power System in the year 2000. Several testing results are given. Presented method can be applicable for long-term planning in a competitive electricity market due to possibility of unit commitment calculations with different electrical energy price during scheduling horizon. (authors)

  19. Modular Power Supply for Micro Resistance Welding

    Directory of Open Access Journals (Sweden)

    Bondarenko Oleksandr

    2017-07-01

    Full Text Available The study is devoted to the important issue of enhancing the circuitry and characteristics of power supplies for micro resistance welding machines. The aim of the research is to provide high quality input current and to increase the energy efficiency of the output pulse generator by means of improving the circuit topologies of the power supply main blocks. In study, the principle of constructing the power supply for micro resistance welding, which provides high values of output welding current and high accuracy of welding pulse formation, makes it possible to reduce energy losses, and provides high quality of consumed input current, is represented. The multiphase topology of the charger with power factor correction based on SEPIC converters is suggested as the most efficient for charging the supercapacitor storage module. The multicell topology of the supercapacitor energy storage with voltage equalizing is presented. The parameters of the converter cells are evaluated. The calculations of energy efficiency of the power supply’s input and output converters based on suggested topologies are carried out and verified in MATLAB Simulink. The power factor value greater than 99 % is derived.

  20. HydroSoft coil versus HydroCoil for endovascular aneurysm occlusion study: A single center experience

    International Nuclear Information System (INIS)

    Guo Xinbin; Fan Yimu; Zhang Jianning

    2011-01-01

    Background and purpose: The HydroCoil Embolic System (HES) was developed to reduce recurrences of aneurysms relative to platinum coils. But the HydroCoil Embolic System was characterized with many limitations. The manufacturer had recognized the challenge and recently a new design of hydrogel-coated coil-HydroSoft has become available in the market as the new generation HydroCoil. We reported our initial experience using HydroSoft coil versus HydroCoil in our center. Methods: 75 aneurysms embolized primarily using HydroSoft Coils from July 2008 to May 2009 were compared with 66 volume- and shape-matched aneurysms treated with HydroCoils from March 2006 to August 2008. Outcome measures included length and number of coils used, contrast volume, and length of hospital stay. During embolization, a stable framework was first established with bare coils, and hydrogel-coated coils were used subsequently to increase the packing density. Follow-up angiographic results 6 months after treatment were evaluated among some of the patients. Results: Successful coil embolization was achieved in all patients. There were no differences in average total coil length used per aneurysm. There were no differences in length of hospital stay and packing density. HydroSoft coils were more suitable using as the finishing or final coil. HydroSoft coil decreased the procedure-related retreated rates, and aneurysm packing was finished with soft, flexible HydroSoft coil and decreased the neck remnant rates. Follow-up angiography in HydroSoft-treated patients at 6 months revealed aneurysm stability without significant residual neck. Conclusions: HydroSoft coil allowed us to deploy coated coils with good packing density. A slight expansion of these coils at the neck can be expected to reduce neck remnant and potentially inhibit recurrence.

  1. Hydro-power installation on the Prascherbach, Nufenen, Switzerland; Wasserkraftwerk Prascherbach, Nufenen. Programm Kleinwasserkraftwerke - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Marugg, R.

    2008-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) describes project variants for the replacement of an 80-year old hydro-power plant in Nufenen, Switzerland. Details on the new power station, which is to produce 300 kilowatts of electrical power using a height difference of 340 metres is to provide 1.3 million kilowatt-hours of electricity per year. The report reviews the history of the project, which goes back to the 1990s and describes the project approved in 1999 as well as the updates made afterwards. The financial aspects of the project and remuneration for the power generated are examined. Environmental issues connected with the project are also discussed. The proposed course of events involved in taking further steps toward the realisation of the installation are discussed. An appendix includes copies of the various documents pertaining to cost estimation, water quantities, environmental protection and the granting of building permission.

  2. Preliminary study on the reactivation of the WERAP small hydro power station in Bubikon

    International Nuclear Information System (INIS)

    Bretscher, A.; Gutzwiller, S.

    2003-01-01

    This study on the revitalisation of a small hydro power station belonging to old spinning mill in Bubikon, Switzerland, proposes ideas for the reactivation of an old hydropower installation that once helped power a spinning mill. Details are given on the history of the mill and the hydrological conditions to be expected at the site. Three variants are proposed for the refurbishment, including the revision of the power station's existing 44 kW Francis turbine dating from 1908, the addition of further, similar Francis turbine or its replacement with a new 61 kW Francis turbine. The costs and amortisation of the refurbishment variants are examined, the revenues that can be expected from its operation and other financial factors are discussed. Further, environmental and legal aspects of the project are examined and suggestions are made for the next steps to be taken towards the realisation of this small hydropower plant. An annex provides photographs of the location and the power station's equipment

  3. 77 FR 37031 - Don W. Gilbert Hydro Power, LLC; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2012-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14367-001] Don W. Gilbert... No.: 14367-001. c. Date filed: May 30, 2012. d. Applicant: Don W. Gilbert Hydro Power, LLC. e. Name... Utility Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708.] h. Applicant Contact: Don W. Gilbert and...

  4. An asymmetric resonant coupling wireless power transmission link for Micro-Ball Endoscopy.

    Science.gov (United States)

    Sun, Tianjia; Xie, Xiang; Li, Guolin; Gu, Yingke; Deng, Yangdong; Wang, Ziqiang; Wang, Zhihua

    2010-01-01

    This paper investigates the design and optimization of a wireless power transmission link targeting Micro-Ball Endoscopy applications. A novel asymmetric resonant coupling structure is proposed to deliver power to an endoscopic Micro-Ball system for image read-out after it is excreted. Such a technology enables many key medical applications with stringent requirements for small system volume and high power delivery efficiency. A prototyping power transmission sub-system of the Micro-Ball system was implemented. It consists of primary coil, middle resonant coil, and cube-like full-direction secondary receiving coils. Our experimental results proved that 200mW of power can be successfully delivered. Such a wireless power transmission capability could satisfy the requirements of the Micro-Ball based endoscopy application. The transmission efficiency is in the range of 41% (worst working condition) to 53% (best working condition). Comparing to conventional structures, Asymmetric Resonant Coupling Structure improves power efficiency by 13%.

  5. Ontario Hydro's experience in implementing on-the-job training for chemical technicians

    International Nuclear Information System (INIS)

    Cooper, G.A.

    1996-01-01

    Since 1989, Ontario Hydro Nuclear has been developing and implementing formalized On-the-Job Training for qualifying its nuclear power plant chemical laboratory staff. This paper focuses on the process followed in designing, developing and implementing this training, with emphasis on the strengths and weaknesses of the program. 7 refs, 3 figs

  6. Distributed maximum power point tracking in wind micro-grids

    Directory of Open Access Journals (Sweden)

    Carlos Andrés Ramos-Paja

    2012-06-01

    Full Text Available With the aim of reducing the hardware requirements in micro-grids based on wind generators, a distributed maximum power point tracking algorithm is proposed. Such a solution reduces the amount of current sensors and processing devices to maximize the power extracted from the micro-grid, reducing the application cost. The analysis of the optimal operating points of the wind generator was performed experimentally, which in addition provides realistic model parameters. Finally, the proposed solution was validated by means of detailed simulations performed in the power electronics software PSIM, contrasting the achieved performance with traditional solutions.

  7. A combined hydro-nuclear-solar project for electric power production

    International Nuclear Information System (INIS)

    Yiftah, S.

    1985-01-01

    Some of the main, general-perspective themes of Dr. Alvin Weinberg's leadership and long and varied work are: the effect of present and future nuclear energy projects on society, not only in the United States but throughout the world; analysis, comparison, and combination of various sources of energy; extensive multiple use of nuclear energy complexes (so-called NUPLEX, for nuclear complex) for various areas of the world; and use of ''Big Technology'' and ''Big Science'' for solving, or helping to solve, political problems. A combined hydro-nuclear-solar project for electric power production is discussed, as well as two other energy-related engineering projects. Some of the projects originated or were inspired by work done at the Oak Ridge National Laboratory under the leadership of Dr. Alvin Weinberg. Also reported are the technical characteristics and interrelationships of the three components of the envisaged hydronuclear-solar project

  8. Hydro investment analysis under new market conditions

    Energy Technology Data Exchange (ETDEWEB)

    Doorman, Gerard

    2010-07-01

    Full text: A future energy system with stronger coupling to Europe and with an increased share of non-regulated renewables will lead to increasing variability of the demand faced by the hydro system. In a market based system these variations will be reflected by larger daily price variations, both in the Elspot day ahead market, the Elbas intraday market and in the balancing market. With its unique regulation capabilities, hydro power will be very well positioned to handle these variations. However, existing model concepts for long term hydro scheduling were not developed for this framework, and do not take the new market conditions into account to a sufficient degree. Therefore hydro scheduling tools used for upgrading and investment analysis as well as analysing consequences of new environmental demands need adaptation to a finer temporal resolution, and to perform optimisation under varying constraints and uncertain input data for inflow and electricity prices. Focus is on investment analysis for a river system or power producer. Existing models can be grouped in the long-term (scheduling models with a time horizon up to 5 years) EOPS (Vansimtap), EOPS-ST (SimtapEffekt) and ProdRisk, and the shortterm scheduling models with a typical time horizon up to a few weeks, but focus on 1-2 days (SHOP and ID-SIM). A perfect tool in the present context would combine the properties of the long term stochastic optimisation models with the modelling details of SHOP and/or ID-SIM. However, this is probably not possible and simplifications will be necessary. Some important deficiencies in the present long term models are: Insufficiently realistic plant models in the relevant optimization models; Time delays are not handled; Handing of flexible / state dependent constraints; Handling of ramping constraints; Modelling of the cost of frequent regulations (wear and tear); Reserve markets As a result of these deficiencies the investment analysis does not adequately assess the value

  9. EDITORIAL: Selected papers from the 11th International Workshop on Micro and Nanotechnology for Power Generation and Energy Conversion Applications (PowerMEMS 2011) Selected papers from the 11th International Workshop on Micro and Nanotechnology for Power Generation and Energy Conversion Applications (PowerMEMS 2011)

    Science.gov (United States)

    Cho, Young-Ho

    2012-09-01

    This special section of Journal of Micromechanics and Microengineering features papers selected from the 11th International Workshop on Micro and Nanotechnology for Power Generation and Energy Conversion Applications (PowerMEMS 2011), held at Sejong Hotel in Seoul, Korea during 15-18 November 2011. Since the first PowerMEMS workshop held in Sendai, Japan in 2000, the workshop has developed as the premier forum for reporting research results in micro and nanotechnology for power generation, energy conversion, harvesting and processing applications, including in-depth technical issues on nanostructures and materials for small-scale high-density energy and thermal management. Potential PowerMEMS applications cover not only portable power devices for consumer electronics and remote sensors, but also micro engines, impulsive thrusters and fuel cells for systems ranging from the nanometer to the millimeter scale. The 2011 technical program consists of 1 plenary talk, 4 invited talks and 118 contributed presentations. The 48 oral and 70 poster presentations, selected by 27 Technical Program Committee Members from 131 submitted abstracts, have stimulated lively discussion maximizing the interaction between participants. Among them, this special section includes 9 papers covering micro-scale power generators, energy converters, harvesters, thrusters and thermal coolers. Finally, we are grateful to the members of the International Steering Committee, the Technical Program Committee, and the Local Organizing Committee for their efforts and contributions to PowerMEMS 2011. We also thank the two companies Samsung Electro-Mechanics and LG Elite for technical tour arrangements. Special thanks go to Dr Ian Forbes, the editorial staff of the Journal of Micromechanics and Microengineering, as well as to the staff of IOP Publishing for making this special section possible.

  10. Pemantauan Pembangkit Listrik Tenaga Mikrohidro (PLTMH

    Directory of Open Access Journals (Sweden)

    Arif Gunawan

    2014-03-01

    Full Text Available This research is motivated by electrical power shutting-down that frequently occurred in Riau province. Low electrical power supply as compared to the need causes lack of supply. Thus, new alternative electrical energy resource such as micro hydro is required. Micro hydro plant is an electrical power generators that uses water to rotate the turbine. This research designs a monitoring system for micro hydro plant. The monitored micro hydro plant employs water turbine that is constructed using bicycle pedal and a water pipe installed on the pedal . The pipe flows the water to energize the turbine. Turbine rotation will generate electricity. The amount of power resulted by generators depends on the number of turbine rotation. The power is used to turn on the lamp. Some sensors are used to monitor generator performance. Current, voltage, and rotation sensors are used to monitor the resulted current, voltage, the turbine rotation respectively. The output power is stored in the battery. The micro Arduino and the ethernet shield capture the monitored data and send it to the computers using Wi-Fi connection. Measurement results show that the output voltage produced by the generator is 10 Volts when the water volume is high. Finally, it is found that the micro hydro generator is able to supply 5 Watts to the load.

  11. Is micro-CHP price controllable under price signal controlled Virtual Power Plants?

    DEFF Research Database (Denmark)

    You, Shi; Træholt, Chresten; Poulsen, Bjarne

    2011-01-01

    As micro-combined heat and power (micro-CHP) systems move towards mass deployment together with other kinds of distributed energy resources (DER), an increasing emphasis has been placed on how to coordinate such a large diversified DER portfolio in an efficient way by the Virtual Power Plant (VPP...... for three different micro-CHP systems to investigate the feasibility of being controlled by price. Such analysis is relevant for both controller designs for micro-CHP systems and VPP related operations. The results indicate that controlling the micro-CHP systems by price is feasible but could result...

  12. A Low-Power and Low-Voltage Power Management Strategy for On-Chip Micro Solar Cells

    Directory of Open Access Journals (Sweden)

    Ismail Cevik

    2015-01-01

    Full Text Available Fundamental characteristics of on-chip micro solar cell (MSC structures were investigated in this study. Several MSC structures using different layers in three different CMOS processes were designed and fabricated. Effects of PN junction structure and process technology on solar cell performance were measured. Parameters for low-power and low-voltage implementation of power management strategy and boost converter based circuits utilizing fractional voltage maximum power point tracking (FVMPPT algorithm were determined. The FVMPPT algorithm works based on the fraction between the maximum power point operation voltage and the open circuit voltage of the solar cell structure. This ratio is typically between 0.72 and 0.78 for commercially available poly crystalline silicon solar cells that produce several watts of power under typical daylight illumination. Measurements showed that the fractional voltage ratio is much higher and fairly constant between 0.82 and 0.85 for on-chip mono crystalline silicon micro solar cell structures that produce micro watts of power. Mono crystalline silicon solar cell structures were observed to result in better power fill factor (PFF that is higher than 74% indicating a higher energy harvesting efficiency.

  13. Icogne irrigation-network hydro-power installation; Petite centrale hydro-electrique sur le reseau d'irrigation de la commune d'Icogne. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Cordonier, N.; Rey, G. [Nicolas Cordonier et Gilles Rey SA, Sierre (Switzerland)

    2007-01-15

    This final report for the Swiss Federal Office of Energy (SFOE) presents the feasibility study for a hydro-power installation that uses an existing municipal irrigation scheme in the alpine region of Icogne, Switzerland. The report takes a look at the present situation which features, apart from the irrigation scheme itself, mountain torrents and artificial compensation lakes. The concept for the use of the available water pressure due to height-difference between these two lakes to drive a turbine and so generate electricity is described. Variants considered are reviewed. Investment and operating costs are examined as are the electricity production and the cost of the power generated. Finally, investments and other financial aspects are looked at and the further course of action is discussed.

  14. Micro and mini hydroelectric power assessment in Uruguay

    International Nuclear Information System (INIS)

    Nunes, V.; Genta, J.L.

    1996-01-01

    The School of Engineering in Montevideo, Uruguay, within the framework of Agreements made with the National Utility, has carried out an assessment of the potential and studies of the feasibility of the use of renewable energy for the generation of electrical power, both at the industrial level and the autonomous level for rural electrification. Original assessment methodologies were developed, including calculation tools which allow, for example, to analyze historical meteorological data, to calculate the available energy in different kinds of energy generators and also to stimulate the operation and design of autonomous systems with established load requirements and service quality. At the micro and mini hydropower assessment, the main role was placed on the census of potential users and the preliminary analysis of the representative places for the different technical solutions adequate to the variety of topographic conditions and load requirements. For power above 1 MW and up to 5 MW, the generating potential was assessed all over the country. If power lower than 1 MW or lower than 100kW (mini and micro) is considered, the information available in maps with contour lines, including in those of a 1:50,000 scale, is not enough to identify the most adequate places. Instead, knowledge of the place is indispensable in these cases. A preliminary plan of several installations was worked out. (Author)

  15. IPPSO raises Hydro exports in smog negotiations

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Independent Power Producers of Ontario (IPPSO) requested federal and provincial committees negotiating atmospheric emission standards to review Ontario Hydro's export wheeling plans. IPPSO alleges that Ontario Hydro is preparing to apply pressure on the Canadian export approval process, and is building up a major effort that will increase emissions, contrary to the objectives embodied in a number of environment protection projects such as the Ontario Smog Plan, The Federal-Provincial NOx Management Plan, the Strategic Options Plan, or the Convention on Long-Range Transboundary Air Pollution Draft NOx Protocol Negotiations. IPPSO alleges further that while Ontario Hydro is one of Canada's largest single emitter of greenhouse gases NOx, and SO 2 , and as a public sector corporation it should be the most amenable to serving the public good, the Corporation is doing exactly the opposite: it actively prevents production of electricity from less polluting sources. It is IPPSO's contention that Ontario Hydro's desire to control the Ontario market could come at significant cost to the environment

  16. Micro-battery Development for Juvenile Salmon Acoustic Telemetry System Applications

    Science.gov (United States)

    Chen, Honghao; Cartmell, Samuel; Wang, Qiang; Lozano, Terence; Deng, Z. Daniel; Li, Huidong; Chen, Xilin; Yuan, Yong; Gross, Mark E.; Carlson, Thomas J.; Xiao, Jie

    2014-01-01

    The Endangered Species Act requires actions that improve the passage and survival rates for migrating salmonoids and other fish species that sustain injury and mortality when passing through hydroelectric dams. To develop a low-cost revolutionary acoustic transmitter that may be injected instead of surgically implanted into the fish, one major challenge that needs to be addressed is the micro-battery power source. This work focuses on the design and fabrication of micro-batteries for injectable fish tags. High pulse current and required service life have both been achieved as well as doubling the gravimetric energy density of the battery. The newly designed micro-batteries have intrinsically low impedance, leading to significantly improved electrochemical performances at low temperatures as compared with commercial SR416 batteries. Successful field trial by using the micro-battery powered transmitters injected into fish has been demonstrated, providing an exemplary model of transferring fundamental research into practical devices with controlled qualities.

  17. Hydro power projects in Pakistan- who pays the price

    International Nuclear Information System (INIS)

    Baig, N.

    2005-01-01

    In this paper an attempt has been made to trace the procedures that have been adopted to arrive at the market value of the assets lost in the construction of Ghazi Barotha Hydro Power Project. There is nothing secret or mysterious about the value of land. It is a commodity commonly dealt with and like every other commodity it. has a price, which can be ascertained within certain limits. This price, however, constantly varies according to the variations of the supply and demand and it is impossible to fix it at any given time with mathematical accuracy. The question of fair compensation is not an algebraic problem, which would be solved by an abstract formula. Compensation must be determined by reference to the price, which a willing vendor might reasonably expect to obtain from a willing purchaser. Although market value cannot be calculated with mathematical precision and a certain amount of conjecture is inevitable, but in valuing one should be careful not to go too far in this direction. (author)

  18. Revisiting Renewable Energy Map in Indonesia: Seasonal Hydro and Solar Energy Potential for Rural Off-Grid Electrification (Provincial Level

    Directory of Open Access Journals (Sweden)

    Agung Wahyuono Ruri

    2018-01-01

    Full Text Available Regarding the acceleration of renewable energy diffusion in Indonesia as well as achieving the national energy mix target, renewable energy map is essential to provide useful information to build renewable energy system. This work aims at updating the renewable energy potential map, i.e. hydro and solar energy potential, with a revised model based on the global climate data. The renewable energy map is intended to assist the design off-grid system by hydropower plant or photovoltaic system, particularly for rural electrification. Specifically, the hydro energy map enables the stakeholders to determine the suitable on-site hydro energy technology (from pico-hydro, micro-hydro, mini-hydro to large hydropower plant. Meanwhile, the solar energy map depicts not only seasonal solar energy potential but also estimated energy output from photovoltaic system.

  19. Development of a micro-thermal flow sensor with thin-film thermocouples

    Science.gov (United States)

    Kim, Tae Hoon; Kim, Sung Jin

    2006-11-01

    A micro-thermal flow sensor is developed using thin-film thermocouples as temperature sensors. A micro-thermal flow sensor consists of a heater and thin-film thermocouples which are deposited on a quartz wafer using stainless steel masks. Thin-film thermocouples are made of standard K-type thermocouple materials. The mass flow rate is measured by detecting the temperature difference of the thin-film thermocouples located in the upstream and downstream sections relative to a heater. The performance of the micro-thermal flow sensor is experimentally evaluated. In addition, a numerical model is presented and verified by experimental results. The effects of mass flow rate, input power, and position of temperature sensors on the performance of the micro-thermal flow sensor are experimentally investigated. At low values, the mass flow rate varies linearly with the temperature difference. The linearity of the micro-thermal flow sensor is shown to be independent of the input power. Finally, the position of the temperature sensors is shown to affect both the sensitivity and the linearity of the micro-thermal flow sensor.

  20. Report of the special prosecutor: BC Hydro 'Raiwind' project

    International Nuclear Information System (INIS)

    Fraser, P. D. K.

    1999-10-01

    A special prosecutor has been appointed by the British Columbia Government to assist the Royal Canadian Mounted Police (RCMP) in its investigation, and to render appropriate charging decisions in the matter of the circumstances surrounding the creation of IPC International Power Corporation (IPC) owned by a Mr. John N. Laxton, former Chairman of BC Hydro and his two children, and its joint venture with BC Hydro for the development of an international power project in Pakistan known as the Raiwind project. Of particular concerns were the conflict of interest breached by Mr. Laxton in loaning a substantial sum of money to a principal member of the Pakistani side of the joint venture, and by the former President and CEO of BC Hydro, Mr. John Sheehan, by his purchase of shares of IPC by a company owned by members of his family. In 1996 Mr. Sheehan's employment as President and CEO was terminated by BC Hydro for breaching internal conflict of interest guidelines and for failing to get approval from BC Hydro for the acquisition of IPC shares. Subsequently, Mr. Sheehan commenced an action against BC Hydro for wrongful dismissal, a claim which was upheld by the Supreme Court of British Columbia. The focus of the special prosecutor's criminal investigation ultimately became the conduct of Mr. Laxton and whether a charge could or should be laid under Section 122 of the Criminal Code. The outcome of his investigation, which is discussed in this report, was that there was no substantial likelihood of conviction under the breach or trust provisions of Section 122 with respect to the indirect purchases by Mr. Laxton of shares in IPC. Nor was there any reason to believe that a personal loan made in high-risk circumstances could be a benefit or advantage to the lender. Furthermore, the loan cannot be causally related to any loss or financial harm to BC Hydro. In fact, it could be argued that Mr. Laxton's private decision to make the loan was of real assistance in ensuring that the

  1. Revitalizing the nuclear business at Ontario Hydro

    International Nuclear Information System (INIS)

    Talbot, K.

    1994-01-01

    Ontario Hydro, North America's largest electric power utility, with an installed capacity of 34,000 MW, has under gone a major restructuring over the past year to better align itself with a changing electricity market and evolving customer needs. The single largest new business unit within the new Ontario Hydro is Ontario Hydro Nuclear (OHN), responsible for engineering, operation and maintenance of the Corporation's 20 large nuclear units at three generating sites, OHN faces a significant challenge in returning Ontario's nuclear units to the world-leading performance levels they enjoyed in the past, particularly the older Pickering A and Bruce A plants. However, steady progress is being made as evidenced by improving peer reviews and overall capacity and financial performance

  2. Autonomous micro-platform for multisensors with an advanced power management unit (PMU

    Directory of Open Access Journals (Sweden)

    P. Bellier

    2018-04-01

    Full Text Available In this work, we developed and characterised an autonomous micro-platform including several types of sensors, an advanced power management unit (PMU and radio frequency (RF transmission capabilities. Autonomy requires integration of an energy harvester, an energy storage device, a PMU, ultra-low-power components (including sensors and optimized software. Our choice was to use commercial off-the-shelf components with low-power consumption, low cost and compactness as selection criteria. For the multi-purpose micro-platform, we choose to include the most common sensors (such as temperature, humidity, luminosity, acceleration, etc. and to integrate them in one miniaturised autonomous device.A processing unit is embedded in the system. It allows for data acquisition from each sensor individually, simple data processing, and storing and/or wireless data transmission. Such a system can be used as stand-alone, with an internal storage in a non-volatile memory, or as a node in a wireless network, with bi-directional communication with a hub device where data can be analysed further. According to specific application requirements, system settings can be adjusted, such as the sampling rate, the resolution and the processing of the sensor data.Parallel to full autonomous functionality, the low-power design enables us to power the system by a small battery leading to a high degree of autonomy at a high sampling rate. Therefore, we also developed an alternative battery-powered version of the micro-platform that increases the range of applications. As such, the system is highly versatile and due to its reduced dimensions, it can be used nearly everywhere. Typical applications include the Internet of Things, Industry 4.0, home automation and building structural health monitoring.

  3. An artificial intelligence (AI) NOx/heat rate optimization system for Ontario Hydro`s fossil generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Frank, A.; Bodach, P. [Ontario Hydro, Toronto, ON (Canada); Warriner, G. [Radian International, Tucker, GA (United States); Noblett, J. [Radian International, Austin, TX (United States); Slatsky, M. [Southern Company, Birmingham, AL (United States)

    1999-08-01

    Artificial intelligence (AI)-based software packages which can optimize power plant operations that improves heat rate and also reduces nitrogen oxide emissions are now commonly available for commercial use. This paper discusses the implementation of the AI-based NOx and Heat Rate Optimization System at Ontario Hydro`s generation stations, emphasizing the current AI Optimization Project at Units 5 and 6 of the Lakeview Generating Station. These demonstration programs are showing promising results in NOx reduction and plant performance improvement. The availability of the plant Digital Control System (DCS) in implementing AI optimization in a closed-loop system was shown to be an important criterion for success. Implementation of AI technology at other Ontario Hydro fossil generating units as part of the overall NOx emission reduction system is envisaged to coincide with the retrofit of the original plant control system with the latest DCS systems. 14 refs., 3 figs.

  4. Experimental study of a plat-flame micro combustor burning DME for thermoelectric power generation

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, L.Q.; Zhao, D.Q.; Guo, C.M.; Wang, X.H. [Key Laboratory of Renewable Energy and Gas Hydrate, CAS, Guangzhou Institute of Energy Conversion of CAS, Guangzhou 510640 (China)

    2011-01-15

    A centimeter magnitude thermoelectric (TE) power generation system based on a plat-flame micro combustor burning DME (dimethyl ether) has been developed. The chamber wall of this micro combustor was made of two parallel sintered porous plates which acted as mixture inlet. The main virtue of this combustor is that it can keep combustor wall at lower temperature for reducing heat loss when sustaining a stable flame. Experimental test results showed it was feasible to obtain stable DME/air premixed flame at lean combustion situations in the micro combustor. The combustion load of this 0.48 cm{sup 3} chamber capacity was 20-200 W at equivalence ratio {phi} = 0.6. Though the flame temperature was above 1000 C, the combustor's wall temperature was near 600 C lower than flame temperature. In the demonstrated TE power generation system which integrated the plat-flame micro combustor, a heat spreader had good effect on uniforming the hot side temperature field of TE modules. Cooled by water and with 150 W input power at {phi} = 0.7, the system produced 10 V output at open circuit and 4 V at 10 {omega} load. The maximum power output was above 2 W, and the maximum overall chemical-electric energy conversion efficiency was 1.25%. (author)

  5. Wirelessly powered micro-tracer enabled by miniaturized antenna and microfluidic channel

    International Nuclear Information System (INIS)

    Duan, G; Zhao, X; Seren, H R; Chen, C; Zhang, X

    2015-01-01

    A miniaturized antenna, 380μm by 380μm in size, was fabricated and integrated with a commercialized passive RFID chip to form a micro-tracer, whose size was 2mm by 1mm in total. The micro-tracer was wirelessly powered and interrogated by a single layer spiral reader antenna through near field coupling. To maximize the working distance, the resonant frequency of micro-tracer and reader antenna were matched at 840MHz. Due to the ultra small size of the tracer antenna, power transfer efficiency decreased dramatically as the distance between tracer antenna and reader antenna increased, thus the working distance of the microtracer was limited within 1mm. To achieve massive operation of the micro-tracer, a microfluidic platform was fabricated with in channel focusing and separation. Acrylic sheets were laser cut to define the channel and cover structure, then bonded together layer by layer with a glass substrate, on which reader antenna was integrated. Pump oil was used as the fluidic media carrying the micro-tracer flowing inside the microfluidic channel. The wireless power transfer and real-time communication was demonstrated with the micro-tracer flowing above the reader antenna, as the ID of the micro-tracer was retrieved and displayed on a computer screen. (paper)

  6. Magnetic resonant wireless power transfer for propulsion of implantable micro-robot

    Science.gov (United States)

    Kim, D.; Kim, M.; Yoo, J.; Park, H.-H.; Ahn, S.

    2015-05-01

    Recently, various types of mobile micro-robots have been proposed for medical and industrial applications. Especially in medical applications, a motor system for propulsion cannot easily be used in a micro-robot due to their small size. Therefore, micro-robots are usually actuated by controlling the magnitude and direction of an external magnetic field. However, for micro-robots, these methods in general are only applicable for moving and drilling operations, but not for the undertaking of various missions. In this paper, we propose a new micro-robot concept, which uses wireless power transfer to deliver the propulsion force and electric power simultaneously. The mechanism of Lorentz force generation and the coil design methodologies are explained, and validation of the proposed propulsion system for a micro-robot is discussed thorough a simulation and with actual measurements with up-scaled test vehicles.

  7. Feasibility study and economic analysis of pumped hydro storage and battery storage for a renewable energy powered island

    International Nuclear Information System (INIS)

    Ma, Tao; Yang, Hongxing; Lu, Lin

    2014-01-01

    Highlights: • Batteries and pumped hydro storage schemes are examined. • Sizing procedure for each option is investigated in detail. • The two schemes are compared in terms of life cycle cost and technical viability. • Sensitivity analyses are conducted on five key input parameters. - Abstract: This study examined and compared two energy storage technologies, i.e. batteries and pumped hydro storage (PHS), for the renewable energy powered microgrid power supply system on a remote island in Hong Kong. The problems of energy storage for off-grid renewable energy were analyzed. The sizing methods and economic models were developed, and finally applied in the real project (case study). The results provide the most suitable energy storage scheme for local decision-makers. The two storage schemes were further divided into 4 options. Accordingly, the life-cycle costs (LCC), levelized costs for the renewable energy storage system (LCRES) and the LCC ratios between all options were calculated and compared. It was found that the employment of conventional battery (Option 2) had a higher LCC value than the advanced deep cycle battery (Option 1), indicating that using deep cycle batteries is more suitable for a standalone renewable power supply system. The pumped storage combined with battery bank option (Option 3) had only 55% LCC of that of Option 1, making this combined option more cost-competitive than the sole battery option. The economic benefit of pumped storage is even more significant in the case of purely pumped storage with a hydraulic controller (Option 4), with the lowest LCC among all options at 29–48% of Option 1. Sensitivity analysis demonstrates that PHS is even more cost competitive by controlling some adjustments such as increasing energy storage capacity and days of autonomy. Therefore, the renewable energy system coupled with pumped storage presents technically feasible opportunities and practical potential for continuous power supply in remote

  8. Design for micro-combined cooling, heating and power systems stirling engines and renewable power systems

    CERN Document Server

    2015-01-01

    ‘Design for Micro-Combined Cooling, Heating & Power Systems’ provides a manual for the technical and structural design of systems for supplying decentralised energy in residential buildings. It presents the micro-combined cooling, heating & power systems Stirling engines & renewable energy sources (mCCHP-SE-RES) systems in an accessible manner both for the public at large, and for professionals who conceive, design or commercialise such systems or their components.  The high performance levels of these systems are demonstrated within the final chapter by the results of an experiment in which a house is equipped with a mCCHP-SE-RES system. The reader is also familiarized with the conceptual, technical and legal aspects of modern domestic energy systems; the components that constitute these systems; and advanced algorithms for achieving the structural and technical design of such systems. In residential buildings, satisfying demands of durable development has gradually evolved from necessity to...

  9. Deconstructing hydro: the BC electricity sector in this decade

    International Nuclear Information System (INIS)

    Jaccard, M.

    2001-01-01

    This paper provided speculation regarding the world-wide trend to deregulate electric utilities with particular focus on power deregulation in British Columbia. The four main issues facing electricity reform in British Columbia are to determine if publicly-owned assets should be privatised, how to achieve competitive electricity commodity prices in a de-regulated generation market, to determine the extent to which customers will be allowed direct access to sellers of electricity, and to determine which changes in industry structure are needed to ensure that control over the common carrier does not hinder fair competition. BC Hydro recently issued a plan for the next decade entitled the Integrated Electricity Plan which suggests that almost all growth in supply on the Hydro system will be limited to a few large projects totalling 900 megawatts, to be owned and operated by either BC Hydro or by the Columbia Power Corporation, another Crown entity. This plan is in complete contrast to the evolution of the electricity industry nearly everywhere else in the world where demand growth is being met almost entirely by small- and medium-scale non-utility resources issuing from competitive markets with minimal public funding. This article looks at why BC Hydro will probably be transformed significantly, even dismantled, in the coming decade. The article begins with a section explaining the cause and effects of major changes in the world-wide electricity industry. This is followed by a section reviewing what BC Hydro did in the 1990s while reform was taking place. The article also describes what BC Hydro intends to do in the next decade and explores reasons why this outcome is unlikely. The final section of the article provides an alternative vision of BC Hydro's future over the next decade. 1 tab., 3 figs

  10. Hydro-Quebec opens up, expects positive reaction from FERC

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1997-01-01

    Hydro-Quebec Energy Services US (HQUS), the marketing arm of Hydro-Quebec, amended its application for a power marketing licence with the Federal Energy Regulatory Commission (FERC), by offering to open up five per cent of the wholesale Quebec electricity market to competition. The Corporation hopes that its revised application will satisfy FERC to grant HQUS a power marketer licence, with the right to sell electricity in the US at market-based rates. Hydro-Quebec insiders believe that in addition to opening up the market to competition, thereby equalizing market conditions on both sides of the border, the Corporation's chances of receiving the licence also have been improved by the creation of the provincial energy board (Regie de l'energie) which in future will regulate electricity and gas transmission through Quebec, and establish transmission tariffs. FERC ruling is expected within 60 days of the March 7, 1997 amended application

  11. Pumping station design for a pumped-storage wind-hydro power plant

    International Nuclear Information System (INIS)

    Anagnostopoulos, John S.; Papantonis, Dimitris E.

    2007-01-01

    This work presents a numerical study of the optimum sizing and design of a pumping station unit in a hybrid wind-hydro plant. The standard design that consists of a number of identical pumps operating in parallel is examined in comparison with two other configurations, using one variable-speed pump or an additional set of smaller jockey pumps. The aim is to reduce the amount of the wind generated energy that cannot be transformed to hydraulic energy due to power operation limits of the pumps and the resulting step-wise operation of the pumping station. The plant operation for a period of one year is simulated by a comprehensive evaluation algorithm, which also performs a detailed economic analysis of the plant using dynamic evaluation methods. A preliminary study of the entire plant sizing is carried out at first using an optimization tool based on evolutionary algorithms. The performance of the three examined pumping station units is then computed and analyzed in a comparative study. The results reveal that the use of a variable-speed pump constitutes the most effective and profitable solution, and its superiority is more pronounced for less dispersed wind power potential

  12. Decontamination System Development of Radioative Activated Carbon using Micro-bubbles

    Energy Technology Data Exchange (ETDEWEB)

    Jeon, Jong seon; Kim, Wi soo [NESS, Daejeon (Korea, Republic of); Han, Byoung sub. [Enesys Co., Daejeon (Korea, Republic of)

    2016-10-15

    This study was aimed to develop a decontamination system by applying such technical characteristics that minimizes a generation of secondary wastes while decontaminating radiation wastes. The radioactive activated carbon is removed from the end-of-life air cleaning filter in replacement or decommission of nuclear power plant or nuclear facility. By removing radioactive activated carbon, the filter would be classified as a low radioactive contaminant. And thus the amount of radioactive wastes and the treatment cost would be decreased. We are in development of the activated carbon cleaning technique by utilizing micro-bubbles, which improve efficiency and minimize damage of activated carbon. The purpose of using micro-bubbles is to decontamination carbon micropore, which is difficult to access, by principle of cavitation phenomenon generated in collapse of micro-bubbles. In this study, we introduced the micro-bubble decontamination system developed to decontaminate activated carbon. For further researches, we will determine carbon weight change and the decontamination rate under the experimental conditions such as temperature and pH.

  13. Decontamination System Development of Radioative Activated Carbon using Micro-bubbles

    International Nuclear Information System (INIS)

    Jeon, Jong seon; Kim, Wi soo; Han, Byoung sub.

    2016-01-01

    This study was aimed to develop a decontamination system by applying such technical characteristics that minimizes a generation of secondary wastes while decontaminating radiation wastes. The radioactive activated carbon is removed from the end-of-life air cleaning filter in replacement or decommission of nuclear power plant or nuclear facility. By removing radioactive activated carbon, the filter would be classified as a low radioactive contaminant. And thus the amount of radioactive wastes and the treatment cost would be decreased. We are in development of the activated carbon cleaning technique by utilizing micro-bubbles, which improve efficiency and minimize damage of activated carbon. The purpose of using micro-bubbles is to decontamination carbon micropore, which is difficult to access, by principle of cavitation phenomenon generated in collapse of micro-bubbles. In this study, we introduced the micro-bubble decontamination system developed to decontaminate activated carbon. For further researches, we will determine carbon weight change and the decontamination rate under the experimental conditions such as temperature and pH

  14. Multi-scale modelling of the hydro-mechanical behaviour of argillaceous rocks

    International Nuclear Information System (INIS)

    Van den Eijnden, Bram

    2015-01-01

    Feasibility studies for deep geological radioactive waste disposal facilities have led to an increased interest in the geomechanical modelling of its host rock. In France, a potential host rock is the Callovo-Oxfordian clay-stone. The low permeability of this material is of key importance, as the principle of deep geological disposal strongly relies on the sealing capacity of the host formation. The permeability being coupled to the mechanical material state, hydro-mechanical coupled behaviour of the clay-stone becomes important when mechanical alterations are induced by gallery excavation in the so-called excavation damaged zone (EDZ). In materials with microstructure such as the Callovo-Oxfordian clay-stone, the macroscopic behaviour has its origin in the interaction of its micromechanical constituents. In addition to the coupling between hydraulic and mechanical behaviour, a coupling between the micro (material microstructure) and macro scale will be made. By means of the development of a framework of computational homogenization for hydro-mechanical coupling, a double-scale modelling approach is formulated, for which the macro-scale constitutive relations are derived from the microscale by homogenization. An existing model for the modelling of hydro-mechanical coupling based on the distinct definition of grains and intergranular pore space is adopted and modified to enable the application of first order computational homogenization for obtaining macro-scale stress and fluid transport responses. This model is used to constitute a periodic representative elementary volume (REV) that allows the representation of the local macroscopic behaviour of the clay-stone. As a response to deformation loading, the behaviour of the REV represents the numerical equivalent of a constitutive relation at the macro-scale. For the required consistent tangent operators, the framework of computational homogenization by static condensation is extended to hydro-mechanical coupling. The

  15. Stability assessment of a multi-port power electronic interface for hybrid micro-grid applications

    Science.gov (United States)

    Shamsi, Pourya

    Migration to an industrial society increases the demand for electrical energy. Meanwhile, social causes for preserving the environment and reducing pollutions seek cleaner forms of energy sources. Therefore, there has been a growth in distributed generation from renewable sources in the past decade. Existing regulations and power system coordination does not allow for massive integration of distributed generation throughout the grid. Moreover, the current infrastructures are not designed for interfacing distributed and deregulated generation. In order to remedy this problem, a hybrid micro-grid based on nano-grids is introduced. This system consists of a reliable micro-grid structure that provides a smooth transition from the current distribution networks to smart micro-grid systems. Multi-port power electronic interfaces are introduced to manage the local generation, storage, and consumption. Afterwards, a model for this micro-grid is derived. Using this model, the stability of the system under a variety of source and load induced disturbances is studied. Moreover, pole-zero study of the micro-grid is performed under various loading conditions. An experimental setup of this micro-grid is developed, and the validity of the model in emulating the dynamic behavior of the system is verified. This study provides a theory for a novel hybrid micro-grid as well as models for stability assessment of the proposed micro-grid.

  16. Advances in the implementation of a generic long term model for the hydro industry

    International Nuclear Information System (INIS)

    Welt, F.

    2004-01-01

    This presentation describes the Vista Long Term (LT) simulation and decision tool developed for the hydropower and water resource industries by Synexus Global. Vista maximizes the value of hydro resources while addressing environmental concerns. It improves water resource management for all uses over the long term. The tool has been used and adapted to many systems around the world, including Bonneville Power Administration, Reliant Energy, PacifiCorp and Great Lakes Power in the United States and Nova Scotia Power, Yukon Energy, and Newfoundland Hydro in Canada. Vista also helps to plan alternative operating policies and system upgrades by maximizing the expected value of generation and transactions. The tool provides reservoir releases, generation, flows, levels and transactions. Hydroelectric generating facilities that use the Vista tool have improved clean energy production as well as increased revenues resulting from reservoir and plant optimization. tabs., figs

  17. Energy generated for you : Newfoundland and Labrador Hydro 2003 annual report

    International Nuclear Information System (INIS)

    2004-01-01

    This report provides a consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) with focus on energy production, energy sales, and environmental commitment. The utility, a Crown Corporation owned by the Province of Newfoundland and Labrador, generates, transmits and distributes electricity to utility, industrial and residential customers. It is the parent company of the Hydro Group of Companies which includes Newfoundland and Labrador Hydro, Churchill Falls Corp. Ltd., Lower Churchill Development Corp. Ltd., Gull Island Power Co. Ltd., and Twin Falls Power Co. Ltd.. The installed generating capacity of the Hydro Group of Companies is the fourth largest in Canada. The generating assets include 10 operating hydroelectric plants, 1 oil-fired plant, 4 gas turbines, 28 diesel plants, and the Churchill Falls Hydroelectric generating station. The utility also maintains 4,800 km of transmission lines and more than 3,600 km of lower voltage distribution lines. The utility is isolated from the North American grid. Energy sales in 2003 were one per cent above 2002. The Holyrood thermal generating station had a gross production of 2061 GWh in 2003, an 18 per cent reduction from 2002. The 40 MW Granite Canal Hydroelectric generating station was completed in 2003. The utility also purchased electricity from Corner Brook Pulp and Paper and the Exploits River Partnership in order to meet the demand for capacity and energy on the island. The Hydro Group's net income decreased by 24 per cent in 2003, while there was a 3 per cent increase in revenue. Earnings are expected to be higher in 2004 due to a projected increase in rates. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets

  18. Renewables for sustainable village power

    International Nuclear Information System (INIS)

    Flowers, L.

    1997-03-01

    It is estimated that two billion people live without electricity and its services. In addition, there is a sizeable number of rural villages that have limited electrical service, with either part-day operation by diesel gen-sets or partial electrification (local school or community center and several nearby houses). For many villages connected to the grid, power is often sporadically available and of poor quality. The U.S. National Renewable Energy Laboratory (NREL) in Golden, Colorado, has initiated a program to address these potential electricity opportunities in rural villages through the application of renewable energy (RE) technologies. The objective of this program is to develop and implement applications that demonstrate the technical performance, economic competitiveness, operational viability, and environmental benefits of renewable rural electric solutions, compared to the conventional options of line extension and isolated diesel mini-grids. These four attributes foster sustainability; therefore, the program is entitled Renewables for Sustainable Village Power (RSVP). The RSVP program is a multi-technology, multi-application program composed of six activities, including village applications development, computer model development, systems analysis, pilot project development, technical assistance, and Internet-based village power project data base. While the current program emphasizes wind, photovoltaics (PV), and their hybrids with diesel gen-sets, micro-hydro and micro-biomass technologies may be integrated in the future. NREL's RSVP team is currently involved in rural electricity projects in thirteen countries, with U.S., foreign, and internationally based agencies and institutions. The integration of the technology developments, institutional experiences, and the financial solutions for the implementation of renewables in the main line rural electrification processes in both the developing world and remote regions of the developed world is the goal

  19. Homegrown hydro, part 2: Private sector an important resource for developing Canadian exports

    International Nuclear Information System (INIS)

    Wiebe, P. A.

    1994-01-01

    A review of four major hydro consultants across Canada illustrates how the private sector has become an important resource for export of Canadian goods and services. The major utilities have contributed in operations and training and have acted as catalysts in this process. An overview is presented of the history and export activities of four consultants: Monenco, Acres, SNC, and Klohn-Crippen. The linkage between domestic experience and expansion into foreign markets in hydro resource development is apparent. Domestic projects have fallen into a severe decline due to the market; it is suggested that cyclical markets might be avoided by constructing capacity in advance. A tally is provided of current Canadian projects, which represent a substantial economic potential for sustainable, renewable hydroelectric resource development. 1 fig

  20. Green power programs in Canada : 2002 : Overview of Government green power policies, utility green power development programs, green power and certificate marketing initiatives, and their benefits

    International Nuclear Information System (INIS)

    Bramley, M.; Boustie, S.; Vadgama, J.; Wieler, C.; Pape-Salmon, A.; Holmes, R.

    2003-11-01

    Green power is generally defined as electricity produced from renewable sources, and whose production has low adverse impacts on the environment, human health and communities. Green power has near-zero greenhouse gas (GHG) emissions and includes sources such as wind, hydro, and solar power. Green power offers several environmental benefits, as well as the enhancement of energy security, regional development, economic diversification and the creation of skilled jobs. There are four categories of programs related to green power development in Canada: government green power policies, utility green power development programs, green power marketing initiatives, and green power certificate marketing initiatives. Most of the activities associated with these four categories in 2002 were discussed in this report. However, difficulties with quantification prevented the inclusion of some green power activities in the report, such as (1) the generation of green power not certified or identified by the generator as green power, (2) industry or residential self-generation, (3) net metering, and (4) small government programs. Each category was presented in detail. The information included in the report was based on surveys sent to each program proponent. Follow-up communications and other publicly available information was also included. New programs operating in 2003 or currently under development were listed. refs., 8 tabs

  1. Development turbine blade for ultramicro hydro power generation by 3D printer system

    Science.gov (United States)

    Kamimura, T.; Itoh, H.; Sugiura, K.

    2017-11-01

    We have developed micro generation system for effective use of unutilized energy and the spread of a self-controlled dispersion energy supply system. The turbine blade was designed for achieving high performance by special shape. The turbine type was called quasi-Peace turbine type. Turbine with a diameter of 30cm is made of metal, it was created by the 5-axis milling machine. The experimental apparatus was fabricated by the 3D printer. An experiment was carried out in the scale down model. The specific speed of this turbine was much lower than that of existing turbines.

  2. Ontario hydro waste storage concepts and facilities

    International Nuclear Information System (INIS)

    Carter, T.J.; Mentes, G.A.

    1976-01-01

    Ontario Hydro presently operates 2,200 MWe of CANDU heavy water reactors with a further 11,000 MWe under design or construction. The annual quantities of low and medium level solid wastes expected to be produced at these stations are tabulated. In order to manage these wastes, Ontario Hydro established a Radioactive Waste Operations Site within the Bruce Nuclear Power Development located on Lake Huron about 250 km northwest of Toronto. The Waste Operations Site includes a 19-acre Storage Site plus a Radioactive Waste Volume Reduction Facility consisting of an incinerator and waste compactor. Ontario has in use or under construction both in-ground and above-ground storage facilities. In-ground facilities have been used for a number of years while the above-ground facilities are a more recent approach. Water, either in the form of precipitation, surface or subsurface water, presents the greatest concern with respect to confinement integrity and safe waste handling and storage operations

  3. Perceived risk of nuclear and hydro electrical power generation in Colombia

    International Nuclear Information System (INIS)

    Munera, H.A.

    1982-12-01

    This report deals with the estimation of risk factors of hydro plants and the perception of risks and benefits of nuclear, hydropower and coal by a selected part of the public. Historical data (1922 - 1979) on occurrence of earthquakes in Colombia demonstrate high seismicity (3,489 incidents) for the country in total and also for areas where the majority of hydro projects are to be located. Model-based calculations of regional probabilities for earthquakes at prospective dam-sites with a magnitude of 7 (Richter scale) or larger resulted in p=0.038/year for a 50 year recurrence period for high and p=0.0004/year for low seismicity areas. Attitudes towards three energy systems were elicited from 130 university students and graduates with a questionnaire based on a psychometric model. Generally attitudes were most favourable towards hydro, less favourable towards coal and more critical towards nuclear. Nuclear is perceived to have economic advantages, but to pose environmental, individual and societal risks. Respondents PRO and CON nuclear agree on the lack of risk from hydropower

  4. Experimental investigation of fish downstream passage and turbine related fish mortality at an innovative hydro power setup

    International Nuclear Information System (INIS)

    Geiger, Franz; Cuchet, Mathilde; Rutschmann, Peter

    2016-01-01

    The fish downstream passage of small fish at the innovative TUM hydro shaft power plant concept was investigated experimentally. The behavior of 1974 inserted individuals of brown trout, grayling, barbel, minnow and bullhead of 45 mm to 220 mm body length was observed in a fully functional test setup which included a 35 kW Kaplan turbine and a horizontal screen with 20 mm bar clearance. The 24 h tests were conducted under nature like conditions whereas the laboratory environment also enabled targeted hydraulic situations and modifications of the bypass during the test series. A recapture rate of the fish of 99% and a subsequent 96 h observation period yielded detailed information about the migration behavior and instant as well as long term mortality. The results reveal the actual passage distribution of small fish between bypass and turbine and the turbine related injury and mortality rates in dependency of fish species, fish length, turbine discharge and bypass arrangement. General trends as well as species specific particularities could be deduced. The work confirms the suitability of the employed experimental approach and the ecological potential of the investigated hydro power plant concept. The behavioral barrier effect of the screen on small fish and the necessary of appropriate downstream migration corridor were proved and quantified. (authors)

  5. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  6. Accelerating Sustainability by Hydropower Development in China: The Story of HydroLancang

    Directory of Open Access Journals (Sweden)

    Yan Zhang

    2017-07-01

    Full Text Available Sustainable development is a shared responsibility. Accelerating sustainability of water–energy–people nexus and building a common awareness of issues pertaining to sustainable development are essential for any sort of success in this direction. Hydropower has been a useful sustainable energy for development, yet highly controversial. This paper reviews the overall situation of hydropower development and China’s energy reforms and policies, accompanied with a case study of hydropower development the Lancang River by the HydroLancang, aiming to illustrate the two opposite sides of hydropower development—economy and environment. The paper concludes with a neutral view of hydropower as the necessary facilitator for development. Water is a shared responsibility. Hydropower might not be the optimum solution to eliminate the tension between human demand of energy and finite natural resource and the rising pressure of climate change worldwide, but it serves well as an “Electricity Bridge” before better alternatives become available. This is a more balanced view of hydropower rather than two extreme viewpoints that present themselves: on the one hand, exaggerated claims of the human power to tame the wild river, and, on the other hand, the idealistic fantasy of preserving nature by abandoning all human activity.

  7. 77 FR 70423 - Black Bear Hydro Partners, LLC and Black Bear Development Holdings, LLC and Black Bear SO, LLC...

    Science.gov (United States)

    2012-11-26

    ... Bear Hydro Partners, LLC and Black Bear Development Holdings, LLC and Black Bear SO, LLC; Notice of..., 2012, Black Bear Hydro Partners, LLC, sole licensee (transferor) and Black Bear Development Holdings, LLC and Black Bear SO, LLC (transferees) filed an application for the partial the transfer of licenses...

  8. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    Science.gov (United States)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  9. High-performance nanostructured thermoelectric generators for micro combined heat and power systems

    International Nuclear Information System (INIS)

    Zhang, Yanliang; Wang, Xiaowei; Cleary, Martin; Schoensee, Luke; Kempf, Nicholas; Richardson, Joseph

    2016-01-01

    Highlights: • A TEG is fabricated using high-efficiency nanostructured thermoelectric materials. • The TEG produces high power density of 2.1 W/cm"2 with 5.3% electrical efficiency. • A micro-CHP system is demonstrated by integrating the TEG into a gas-fired boiler. - Graphical Abstract: - Abstract: Micro combined heat and power (micro-CHP) systems are promising pathways to increase power generation efficiencies. Here a new class of micro-CHP system without moving parts is experimentally demonstrated by integrating high-temperature thermoelectric generators (TEGs) and residential gas-fired boilers, thus enabling wide applications. The TEGs fabricated using high-efficiency nanostructured bulk half-Heusler alloys generate ultrahigh power density of 2.1 W/cm"2 with 5.3% electrical efficiency under 500 °C temperature differences between the hot and cold sides. The TEG system harnesses the untapped exergy between the combustion gas and water, and converts thermal energy into electric power with 4% heat-to-electricity efficiency based on the total heat input into the TEGs. The high-performance TEGs open lots of opportunities to transform power generation technologies and improve energy efficiency.

  10. Manitoba Hydro-Electric Board 52. annual report : Building as one

    International Nuclear Information System (INIS)

    2003-01-01

    A provincial Crown corporation, Manitoba Hydro serves approximately 502,000 customers throughout Manitoba with electric energy, and provides natural gas service to 251,000 customers in several communities in southern Manitoba. In addition, Manitoba Hydro exports electricity to electric utilities and marketers in the mid-western United States, Ontario, and Saskatchewan. In 2002, Winnipeg Hydro was purchased from the City of Winnipeg. Records were broken for historical peak demand for electricity (24 February 2003) and natural gas (22 January 2003). A study of wind power generation was launched, with seven sites being monitored. A Power Smart program focusing on geothermal heat pump systems also offered assistance to Manitoba homeowners. Successful conversion of the Selkirk Generating Station from coal to natural gas was achieved. In Brandon, a 260 mega watt (MW) natural gas combustion turbine plant was opened. Over $29 million in loans were issued to customers under the Home Comfort and Energy Savings Program. Electricity rates for residential customers remained unchanged, as did those for large industrial customers. Approval was received by the National Energy Board to export 500 MW of electricity to Northern States Power. A new international interconnection was brought into service in November 2002 between Glenboro, Manitoba and Harvey, North Dakota. The ISO 14001 international certification for environmental management systems was awarded to Manitoba Hydro. tabs., figs

  11. The 'Lehn' small hydro-power station; KWKW Lehn Vorprojekt - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ruff, H.; Widmer, P.

    2009-02-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) takes a look at the refurbishment of a small hydro-power station in the UNESCO biosphere region in the Entlebuch, Switzerland. The five grounds for the refurbishment are examined - repair of the water intake, flood protection, regulation of residual water, reduction of floating debris and sand and optimisation of the system by using automatic control. Figures on the cost of the refurbishment and electricity production are presented and discussed, as is the economic viability of the project. The existing installations are described and the hydrology of the stream is discussed, as are legal requirements and technical basics. Variants for the refurbishment are examined and operational aspects are looked at. A comprehensive appendix provides details on the proposal in graphical and tabular form.

  12. It's done... or the unmanned operation in hydro power plants

    International Nuclear Information System (INIS)

    Chudy, M.

    2009-01-01

    Looking back at the two years of activities performed while launching the individual Hydro Power Plants (HPP) of the Slovenske elektrarne, a.s. into the unmanned operation, there was 'quantum' of work done during the implementation of each new HPP in the area of group output regulation, substation management, failure and alarm record and evaluation system, technological and information service. It is a good feeling to see the results of the work - when it works. Someone could say that we just test the project at one HPP and the others just get implemented. The fact that the HPPs differ from each other brings its specifics, which needed to be handled individually in the SW or HW area, or in terms of communication. We should definitely mention the enthusiasm and helpfulness of the employees even at the cost of their free time spent in launching the power plants into unmanned operation. The reward for the hours spent dealing with the technical issues and revealing the shortcomings in the whole operation management process is today in the greater possibilities of gaining an overviews of the events in the operation of each HPP or TG generation unit. However, our hands are little less free to perform interventions in the control systems - time for the maintenance - necessary planning of the outages - coordination within the operation preparation. (author)

  13. Short-term regulation of hydro powerplants. Studies on the environmental effects

    International Nuclear Information System (INIS)

    Sinisalmi, T.; Riihimaeki, J.; Vehanen, T.; Yrjaenae, T.

    1997-01-01

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs

  14. Short-term regulation of hydro powerplants. Studies on the environmental effects

    Energy Technology Data Exchange (ETDEWEB)

    Sinisalmi, T. [ed.; Forsius, J.; Muotka, J.; Soimakallio, H. [Imatran Voima Oy, Vantaa (Finland); Riihimaeki, J. [VTT, Espoo (Finland); Vehanen, T. [Finnish Game and Fisheries Research Inst. (Finland); Yrjaenae, T. [North Ostrobothnia Regional Environmental Centre, Oulu (Finland)

    1997-12-31

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs.

  15. CFD-Driven Valve Shape Optimization for Performance Improvement of a Micro Cross-Flow Turbine

    Directory of Open Access Journals (Sweden)

    Endashaw Tesfaye Woldemariam

    2018-01-01

    Full Text Available Turbines are critical parts in hydropower facilities, and the cross-flow turbine is one of the widely applied turbine designs in small- and micro-hydro facilities. Cross-flow turbines are relatively simple, flexible and less expensive, compared to other conventional hydro-turbines. However, the power generation efficiency of cross-flow turbines is not yet well optimized compared to conventional hydro-turbines. In this article, a Computational Fluid Dynamics (CFD-driven design optimization approach is applied to one of the critical parts of the turbine, the valve. The valve controls the fluid flow, as well as determines the velocity and pressure magnitudes of the fluid jet leaving the nozzle region in the turbine. The Non-Uniform Rational B-Spline (NURBS function is employed to generate construction points for the valve profile curve. Control points from the function that are highly sensitive to the output power are selected as optimization parameters, leading to the generation of construction points. Metamodel-assisted and metaheuristic optimization tools are used in the optimization. Optimized turbine designs from both optimization methods outperformed the original design with regard to performance of the turbine. Moreover, the metamodel-assisted optimization approach reduced the computational cost, compared to its counterpart.

  16. Optimal wind-hydro solution for the Marmara region of Turkey to meet electricity demand

    International Nuclear Information System (INIS)

    Dursun, Bahtiyar; Alboyaci, Bora; Gokcol, Cihan

    2011-01-01

    Wind power technology is now a reliable electricity production system. It presents an economically attractive solution for the continuously increasing energy demand of the Marmara region located in Turkey. However, the stochastic behavior of wind speed in the Marmara region can lead to significant disharmony between wind energy production and electricity demand. Therefore, to overcome wind's variable nature, a more reliable solution would be to integrate hydropower with wind energy. In this study, a methodology to estimate an optimal wind-hydro solution is developed and it is subsequently applied to six typical different site cases in the Marmara region in order to define the most beneficial configuration of the wind-hydro system. All numerical calculations are based on the long-term wind speed measurements, electrical load demand and operational characteristics of the system components. -- Research highlights: → This study is the first application of a wind-hydro pumped storage system in Turkey. → The methodology developed in this study is applied to the six sites in the Marmara region of Turkey. A wind - hydro pumped storage system is proposed to meet the electric energy demand of the Marmara region.

  17. Micro Cooling, Heating, and Power (Micro-CHP) and Bio-Fuel Center, Mississippi State University

    Energy Technology Data Exchange (ETDEWEB)

    Louay Chamra

    2008-09-26

    Initially, most micro-CHP systems will likely be designed as constant-power output or base-load systems. This implies that at some point the power requirement will not be met, or that the requirement will be exceeded. Realistically, both cases will occur within a 24-hour period. For example, in the United States, the base electrical load for the average home is approximately 2 kW while the peak electrical demand is slightly over 4 kW. If a 3 kWe micro- CHP system were installed in this situation, part of the time more energy will be provided than could be used and for a portion of the time more energy will be required than could be provided. Jalalzadeh-Azar [6] investigated this situation and presented a comparison of electrical- and thermal-load-following CHP systems. In his investigation he included in a parametric analysis addressing the influence of the subsystem efficiencies on the total primary energy consumption as well as an economic analysis of these systems. He found that an increase in the efficiencies of the on-site power generation and electrical equipment reduced the total monthly import of electricity. A methodology for calculating performance characteristics of different micro-CHP system components will be introduced in this article. Thermodynamic cycles are used to model each individual prime mover. The prime movers modeled in this article are a spark-ignition internal combustion engine (Otto cycle) and a diesel engine (Diesel cycle). Calculations for heat exchanger, absorption chiller, and boiler modeling are also presented. The individual component models are then linked together to calculate total system performance values. Performance characteristics that will be observed for each system include maximum fuel flow rate, total monthly fuel consumption, and system energy (electrical, thermal, and total) efficiencies. Also, whether or not both the required electrical and thermal loads can sufficiently be accounted for within the system

  18. Optimizing Hydro Power Turbines in Order to Secure the Passage of Fishes in Khuzestan province

    Directory of Open Access Journals (Sweden)

    Moona Mohammadi

    2015-04-01

    Full Text Available Nowadays,it is important to consider environmental issues,as ecological problems and their severe effect intensify in Iran,particularly in Khuzestan province.The environmental effects of hydroelectric plants are highly regarded due to their significant impact on an extensive area.The lack of safe path for fish passing through the turbines is one of these damages. In order to deal with these challenges,researchers are trying to optimize hydro power turbines.In this optimization,old runners were replaced,while conditions of fish passing through the turbines and fish survival have been improved.Considering the existence of six hydroelectric power plants in Khuzestan province,it would be possible to conduct optimization or constructing studies with a fish-friendly approach for the safe passage of fishes to slightly reduce the extent of environmental damages.

  19. Ontario Hydro annual report 1975

    International Nuclear Information System (INIS)

    A financial report and statistics on Ontario energy demand are presented. Efforts to secure a reliable supply of coal and uranium are described. Ontario Hydro's expansion is now controlled by capital availability and not power demand, and this has affected 11 construction projects, including heavy water plants and nuclear generating stations. (E.C.B.)

  20. A Novel Pumped Hydro Combined with Compressed Air Energy Storage System

    Directory of Open Access Journals (Sweden)

    Erren Yao

    2013-03-01

    Full Text Available A novel pumped hydro combined with compressed air energy storage (PHCA system is proposed in this paper to resolve the problems of bulk energy storage in the wind power generation industry over an area in China, which is characterised by drought and water shortages. Thermodynamic analysis of the energy storage system, which focuses on the pre-set pressure, storage volume capacity, water air volume ratio, pump performance, and water turbine performance of the storage system, is also presented. This paper discovers how such parameters affect the performance of the whole system. The ideal performance of this novel system has the following advantages: a simple, highly effective and low cost structure, which is comparable to the efficiency of a traditional pumped hydro storage system. Research results show a great solution to the current storage constraints encountered in the development of the wind power industry in China, which have been widely recognised as a bottleneck in the wind energy storage industry.

  1. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  2. A new islanding detection technique for multiple mini hydro based on rate of change of reactive power and load connecting strategy

    International Nuclear Information System (INIS)

    Laghari, J.A.; Mokhlis, H.; Bakar, A.H.A.; Karimi, M.

    2013-01-01

    Highlights: • The requirement of DG interconnection with existing power system is discussed. • Various islanding detection techniques are discussed with their merits and demerits. • New islanding detection strategy is proposed for multiple mini hydro type DGs. • The proposed strategy is based on dq/dt and load connecting strategy. • The effectiveness of strategy is verified on various other cases. - Abstract: The interconnection of distributed generation (DG) into distribution networks is undergoing a rapid global expansion. It enhances the system’s reliability, while simultaneously reduces pollution problems related to the generation of electrical power. To fully utilize the benefits of DGs, certain technical issues need to be addressed. One of the most important issues in this context is islanding detection. This paper presents a new islanding detection technique that is suitable for multiple mini-hydro type DG units. The proposed strategy is based on the rate of change of reactive power and load connecting strategy to detect islanding within the system. For a large power mismatch, islanding is detected by rate of change of reactive power only. However, for a close power mismatch, the rate of change of reactive power initiates a load connecting strategy, which in turn alters the load on the distribution network. This load variation in the distribution network causes a variation in the rate of change of reactive power, which is utilized to distinguish islanding and other events. The simulation results show that the proposed strategy is effective in detecting islanding occurrence in a distribution network

  3. Power Generation from Sewage by a Micro-Hydraulic Turbine

    OpenAIRE

    Tomomi Uchiyama; Tomoko Okayama; Yukio Ide

    2016-01-01

    This study is concerned with the development of a micro-hydraulic turbine for power generation installed in sewer pipes. The runner has a circular hollow around the central (rotating) axis so that solid materials included in water can be easily flow through the runner without blocking the turbine. The laboratory experiments are also conducted. The hollow is very effective to make polyester fibers pass through the turbine. The guide vane is useful to heighten the turbine performance. But it is...

  4. Results from the Macedonian power system development planning

    International Nuclear Information System (INIS)

    Volkanovski, A.; Bosevski, T.; Todorovski, M.

    2000-01-01

    In this paper we present the results from the development planning of the Macedonian power system for the period 2001-2020. Taking into account the fact that one can not consider construction of new power generating units on domestic lignite due to its shortage, development of the national power system can be supported by utilisation of hydro potential, natural gas within the capabilities of the existing gas pipeline and nuclear energy. The crucial year in the planning period will be the year when reduction of the lignite utilisation in the existing thermal plants will take place, which will cause construction of new units with significant capacities. We have analysed two possibilities for inclusion od nuclear plant, optimal based on the economical criteria and forced with delay of the on-line year of the nuclear plant starting from the optimal year for its construction (2014 which was obtained from the WASP optimisation procedure) and ending with the year 2021 (one year beyond the study period). (author)

  5. Ballast Load Control of Turbine-Generator Sets in the Micro-Hydro Range with a Turbine that has no Flow Regulating Value

    Directory of Open Access Journals (Sweden)

    Valentin Nedelea

    2011-09-01

    Full Text Available This paper presents the effects of voltage and frequency variation on users load supplies from electrical supply system generated from small micro-hydro plants. Induction generators operate as stand-alone self excited by capacitors and turbine has no flow regulating valve. Many conventional and non conventional approaches are described to govern turbine-generator set to ensure a steady frequency and voltage level. A load controller increases or decreases a ballast load connected across the generator as the user load varies, to keep frequency and voltage variation in standard limits. To design a controller for self excited induction generator, researches were performed on asynchronous generator with double winding stator to analyse steady state open loop behaviour. The results on the behaviour of the unregulated turbine (DC motor – generator system was presented.

  6. Micro-size cogeneration plants and virtual power plants. New energy landscapes; Mikro-KWK und virtuelle Kraftwerke. Neue Energielandschaften

    Energy Technology Data Exchange (ETDEWEB)

    Roon, Serafin von [Forschungsstelle fuer Energiewirtschaft e.V., Muenchen (Germany)

    2009-07-01

    Combined heat and power generation is an established technology. With micro-size cogeneration units, the technology is now available to private single or multiple dwellings and for decentral power supply of residential blocks. With the right political boundary conditions and integrated into virtual power stations, this is an option for enhanced use of renewable energy sources and for decentral, flexible and climate-friendly heat and power generation in buildings. Economic efficiency analyses by experts, high utilisation rates, innovative developments of the manufacturers and a positive public image are all in favour of a great future for micro-size cogeneration units. (orig.)

  7. Tricks of the trade: Sharing ideas about independent hydro development in Canada

    International Nuclear Information System (INIS)

    Collins, S.J.

    1992-01-01

    Preparation and patience are the keys to developing independent hydropower projects in Canada. Several individuals who have experience breaking into the business share their advice. Opportunities for independent hydro developers to contribute to electricity production in Canada are increasing, thanks to government and utility support. Site selection, costs, environmental regulations, native rights issues, project approval processes, and time lines are all important issues

  8. EDITORIAL: The Fourth International Workshop on Micro and Nanotechnology for Power Generation and Energy Conversion Applications (PowerMEMS 2004)

    Science.gov (United States)

    Tanaka, Shuji; Toriyama, Toshiyuki

    2005-09-01

    This special issue of the Journal of Micromechanics and Microengineering features papers selected from the Fourth International Workshop on Micro and Nanotechnology for Power Generation and Energy Conversion Applications (PowerMEMS 2004). The workshop was held in Kyoto, Japan, on 28-30 November 2004, by The Ritsumeikan Research Institute of Micro System Technology in cooperation with The Global Emerging Technology Institute, The Institute of Electrical Engineers of Japan, The Sensors and Micromachines Society, The Micromachine Center and The Kyoto Nanotech Cluster. Power MEMS is one of the newest categories of MEMS, which encompasses microdevices and microsystems for power generation, energy conversion and propulsion. The first concept of power MEMS was proposed in the late 1990s by Epstein's group at the Massachusetts Institute of Technology, where they continue to study MEMS-based gas turbine generators. Since then, the research and development of power MEMS have been promoted by the need for compact power sources with high energy and power density. Since its inception, power MEMS has expanded to include not only various MEMS-based power generators but also small energy machines and microdevices for macro power generators. At the last workshop, various devices and systems, such as portable fuel cells and their peripherals, micro and small turbo machinery, energy harvesting microdevices, and microthrusters, were presented. Their power levels vary from ten nanowatts to hundreds of watts, spanning ten orders of magnitude. The first PowerMEMS workshop was held in 2000 in Sendai, Japan, and consisted of only seven invited presentations. The workshop has grown since then, and in 2004 there were 5 invited, 20 oral and 29 poster presentations. From the 54 papers in the proceedings, 12 papers have been selected for this special issue. I would like to express my appreciation to the members of the Organizing Committee and Technical Program Committee. This special issue was

  9. Hydro-Quebec is profitable

    International Nuclear Information System (INIS)

    Poirier, M.

    1997-01-01

    The pros and cons of the potential privatisation of Hydro-Quebec were discussed. A brief review of charges of less than competent management, low profitability and the corporation's recent administrative restructuring was presented. The general thrust of the argument was that Hydro-Quebec plays a crucial role in the economic development of Quebec, it can be made to be more profitable and that for the good of Quebec it should continue as a public corporation under the control of the provincial government

  10. Geothermal electric power generation in Iceland for the proposed Iceland/United Kingdom HVDC power link

    International Nuclear Information System (INIS)

    Hammons, T.J.; Palmason, G.; Thorhallsson, S.

    1991-01-01

    The paper reviews geothermal electric power potential in Iceland which could economically be developed to supplement hydro power for the proposed HVDC Power Link to the United Kingdom, and power intensive industries in Iceland, which are envisaged for development at this time. Technically harnessable energy for electricity generation taking account of geothermal resources down to an assumed base depth, temperature distribution in the crust, probable geothermal recovery factor, and accessibility of the field, has been assessed. Nineteen known high-temperature fields and 9 probable fields have been identified. Technically harnessable geo-heat for various areas is indicated. Data on high temperature fields suitable for geothermal electric power generation, and on harnessable energy for electric power generation within volcanic zones, is stated, and overall assessments are made. The paper then reviews how the potential might be developed, discussing preference of possible sites, and cost of the developments at todays prices. Cost of geothermal electric power generation with comparative costs for hydro generation are given. Possible transmission system developments to feed the power to the proposed HVDC Link converter stations are also discussed

  11. Prospects of Nuclear Power for Developing Countries

    International Nuclear Information System (INIS)

    Mourogov, V. M.; Khan, A. M.; Rogner, H-H.; Kagramanian, V. S.

    1998-01-01

    The demand for electricity in developing countries of the world is expected to grow rapidly in the coming decades as these countries undergo the process of industrialization, accompanied by increased urbanization, and seek to improve the living standards of their growing population. The continued heavy reliance of the power sector on fossil fuels will result in an increased dependence of a number of the developing countries on energy imports, with consequentbalance of payment difficulties and implications in terms of reduced energy security, cause severe degradation of the local and regional environment, and will also lead to increasing emissions of greenhouse gases. Increasing the share of hydropower in most of the developing countries is constrained by the limited potential of hydro resources as well as environmental considerations. Other renewable energy technologies such as solar PV and wind power are not expected to play a significant role in the commercial supply of electricity in the foreseeable future in the most part of the developing world. Thus nuclear power as a non-fossil alternative with a proven and mature technology may be called upon to play an increasing role in the future supply of electricity to developing countries. The paper discusses the main factors that are likely to affect, both positively and negatively, the deployment of nuclear power in developing countries and presents the results of the recent IAEA projections on nuclear power capacity growth up to the 2020. The paper also briefly reviews the prospects of nuclear power in Central and Eastern European countries. (author)

  12. BC Hydro experiences the power of engineering document management software

    International Nuclear Information System (INIS)

    Wilkins, A.

    2000-01-01

    The recent popularity of electronic document management software (EDMS), specifically designed for engineering CAD/CAM drawings that holds the promise of reducing paper-pushing and freeing up organizational resources for more productive purposes, is discussed. To illustrate how such systems function, a document management system installed at BC Hydro, with over 2,500 users in two main engineering groups is described. The new system - FileNET - replaces several older systems that have been used as stand-alone systems in various divisions of BC Hydro for some time. Instead of integrating the entire file of some 750,000 documents, the new system has complete records of some 70,000 of the most recent CAD drawings and an on-line index to the older file that is used less frequently. Access to the entire storehouse of drawings is said to be fast, efficient and secure. Automated document control procedures during work-in-progress, viewing, redlining capabilities, seamless integration with CAD tools and Web access to drawings from anywhere within the two engineering divisions, are some of the most noteworthy characteristics of the new system. It does not completely replace paper, but it does promise significant streamlining of the paper handling function. It also ensures that BC Hydro's central computer is the prime repository of all documents and drawings, and that this valuable record of environmental. legal, regulatory and other public policy importance is instantly available, without the need to handle paper

  13. Hydro-power production and fish habitat suitability: Assessing impact and effectiveness of ecological flows at regional scale

    Science.gov (United States)

    Ceola, Serena; Pugliese, Alessio; Ventura, Matteo; Galeati, Giorgio; Montanari, Alberto; Castellarin, Attilio

    2018-06-01

    Anthropogenic activities along streams and rivers may be of major concern for fluvial ecosystems, e.g. abstraction and impoundment of surface water resources may profoundly alter natural streamflow regimes. An established approach aimed at preserving the behavior and distribution of fluvial species relies on the definition of ecological flows (e-flows) downstream of dams and diversion structures. E-flow prescriptions are usually set by basin authorities at regional scale, often without a proper assessment of their impact and effectiveness. On the contrary, we argue that e-flows should be identified on the basis of (i) regional and (ii) quantitative assessments. We focus on central Italy and evaluate the effects on habitat suitability of two near-threatened fish species (i.e. Barbel and Chub) and an existing hydro-power network when shifting from the current time-invariant e-flow policy to a tighter and seasonally-varying soon-to-be-enforced one. Our example clearly shows that: (a) quantitative regional scale assessments are viable even when streamflow observations are entirely missing at study sites; (b) aprioristic e-flows policies may impose releases that exceed natural streamflows for significantly long time intervals (weeks, or months); (c) unduly tightening e-flow policies may heavily impact regional hydro-power productivity (15% and 42% losses on annual and seasonal basis, respectively), yet resulting in either marginal or negligible improvements of fluvial ecosystem.

  14. Bearing Diagnostics of Hydro Power Plants Using Wavelet Packet Transform and a Hidden Markov Model with Orbit Curves

    Directory of Open Access Journals (Sweden)

    Gabriel Pino

    2018-01-01

    Full Text Available The contribution of a medium-sized hydro power plant to the power grid can be either at base load or at peak load. When the latter is the most common operation mode, it increases the start and stop frequency, intensifying the hydro turbine components’ degradation, such as the guide bearings. This happens due to more frequent operation in transient states, which means being outside the service point of the machines’ nominal condition, consisting of speed, flow, and gross head. Such transient state operation increases the runner bearings’ mechanical vibration. The readings are acquired during the runner start-ups and filtered by a DC component mean value and a wavelet packet transform. The filtered series are used to estimate the relationship between the maximum orbit curve displacement and the accumulated operating hours. The estimated equation associated with the ISO 7919-5 vibration standards establishes the sojourn times of the degradation states, sufficient to obtain the transition probability distribution. Thereafter, a triangular probability function is used to determine the observation probability distribution in each state. Both matrices are inputs required by a hidden Markov model aiming to simulate the equipment deterioration process, given a sequence of maximum orbit curve displacements.

  15. BC Hydro's business plan: a summary of BC Hydro's strategic business plan and performance measures

    International Nuclear Information System (INIS)

    2000-04-01

    This document contains a summary of BC Hydro's Strategic Plan and performance measures. The plan has been prepared in response to the recommendations of the Budget Process Review Panel, convened by the BC Government, which recommended that each public body, crown corporation, and other agencies of government, prepare an annual three year business plan. The document reviews the utility's current situation, provides an outline of the company's vision of its role, its mission and values, its strategic objectives (effective governance, efficiency and productivity; service excellence and value-added solutions; market development ; strong and capable organization) and the tools to be utilized in measuring performance. Various strategic issues (financial resources, the need to protect and enhance the value of electricity trading; the impact of information technology; power technology development; environmental trends and 'green energy' initiatives; workforce training and development) are also highlighted

  16. Alternative off-site power supply improves nuclear power plant safety

    International Nuclear Information System (INIS)

    Gjorgiev, Blaže; Volkanovski, Andrija; Kančev, Duško; Čepin, Marko

    2014-01-01

    Highlights: • Additional power supply for mitigation of the station blackout event in NPP is used. • A hydro power plant is considered as an off-site alternative power supply. • An upgrade of the probabilistic safety assessment from its traditional use is made. • The obtained results show improvement of nuclear power plant safety. - Abstract: A reliable power system is important for safe operation of the nuclear power plants. The station blackout event is of great importance for nuclear power plant safety. This event is caused by the loss of all alternating current power supply to the safety and non-safety buses of the nuclear power plant. In this study an independent electrical connection between a pumped-storage hydro power plant and a nuclear power plant is assumed as a standpoint for safety and reliability analysis. The pumped-storage hydro power plant is considered as an alternative power supply. The connection with conventional accumulation type of hydro power plant is analysed in addition. The objective of this paper is to investigate the improvement of nuclear power plant safety resulting from the consideration of the alternative power supplies. The safety of the nuclear power plant is analysed through the core damage frequency, a risk measure assess by the probabilistic safety assessment. The presented method upgrades the probabilistic safety assessment from its common traditional use in sense that it considers non-plant sited systems. The obtained results show significant decrease of the core damage frequency, indicating improvement of nuclear safety if hydro power plant is introduced as an alternative off-site power source

  17. Gas, benefits and question marks. The Oklo reactors: 100 % natural. The Kyoto protocol: use it or lose it?. Small hydro power: a great leap forward. The energy mix of South Korea

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This issue of Alternatives newsletter contains a main press-kit about natural gas economics worldwide and 4 articles dealing with the Oklo natural reactor, the Kyoto protocol, the small hydro-power in China, and the energy mix of South Korea: 1 - 'Gas benefits and question marks': The world's most widely distributed fossil fuel, natural gas is also the fastest-growing energy source of the past thirty years. Its position as the fuel of choice in the global energy mix is due in large part to its many domestic and industrial applications. 2 - 'The Oklo reactors: 100% natural': Another look at this extraordinary 2 billion year-old phenomenon in words and pictures: the nuclear fission reaction that created the natural reactors of Gabon. 3 - 'The Kyoto Protocol: use it or lose it?': Nearly eight years after its signature, the Kyoto Protocol is still hotly debated. Two experts give us their views: Spencer Abraham, former U.S. Secretary for Energy, and Jean-Charles Hourcade of CIRED, the international center for research on the environment and development. 4 - 'Small hydro power: a great leap forward': The Chinese government has responded to the need for rural electrification with an aid program for the country's poorest cantons. Enter the small hydro plant in northern Guangxi province. 5 - 'The energy mix of South Korea': Faced with continuing strong economic growth and energy demand, South Korea has multiplied its projects, from hydropower to tidal power to nuclear and even hydrogen in the longer term

  18. EDITORIAL: The 7th International Workshop on Micro and Nanotechnologies for Power Generation and Energy Conversion Applications (PowerMEMS 2007)

    Science.gov (United States)

    Hebling, C.; Woias, P.

    2008-10-01

    This special issue of Journal of Micromechanics and Microengineering (JMM) contains a selection of papers from the 7th International Workshop on Micro and Nanotechnologies for Power Generation and Energy Conversion (PowerMEMS 2007). The workshop was held in Freiburg, Germany on 27-29 November 2007 under the joint organization of the Fraunhofer Institute for Solar Energy Systems (FhG-ISE), Freiburg and the Department of Microsystems Engineering (IMTEK) of the Albert-Ludwig-University of Freiburg. PowerMEMS 2007 continues a series of workshops initiated in 2000 in Japan to create an annual discussion forum in the emerging field of micro energy technology. With a single exception in 2001, the workshop has continued as an annual meeting ever since, with a continuous increase in the number of presentations and participants. The program of PowerMEMS 2007 was composed of 2 invited talks, 25 oral talks and 61 poster presentations. From these 88 presentations 16 have been selected for this special issue. It was at the end of 1959 when the Caltech physicist Richard Feynman gave his famous lecture entitled 'There Is Plenty of Room at the Bottom' in which he discussed the possibilities of miniaturization for both storage capacity ('Encyclopaedia Britannica on the head of a pin') as well as micro machining ('rearranging the atoms'), although there were absolutely no technological possibilities in sight for an adequate realization of such ideas. Now, nearly 50 years later, we not only have incredible knowledge about the nanoworld, but even more we are now able to generate microelectromechanical devices which, next to their electronic properties, can integrate physical and analytical functions. Today, Feynman might easily have added a second lecture entitled 'There is Plenty of Energy at the Bottom'. Micro energy technology has seen a tremendous rise in MEMS and material sciences and is regarded today as one of their hot topics. Also, there are more and more companies in this

  19. A Novel Frequency Restoring Strategy of Hydro-PV Hybrid Microgrid

    DEFF Research Database (Denmark)

    Wei, Feng; Kai, Sun; Guan, Yajuan

    2014-01-01

    . The existence of frequency steady-state error and the slow active power/frequency dynamic response are inevitable. Therefore, a novel frequency restoring strategy for the hydro-PV hybrid microgrid based on the improved hierarchical control of PV systems is proposed in this paper. The output active power of PV......The conventional PV systems based on the voltage inverters only inject dispatched power to the utility grid when they work at a grid-connected mode in the hydro-PV hybrid microgrid. Due to the droop method employed for load sharing between generators, as well as the enormous inertia of system...... systems is controlled by an extra frequency restoring controller resided in the tertiary control level. The frequency steady-state error is eliminated through regulating and rebalancing the power flow between the hydropower and the PV system. The proposed strategy has verified through simulations...

  20. Power Talk for Multibus DC MicroGrids

    DEFF Research Database (Denmark)

    Angjelichinoski, Marko; Stefanovic, Cedomir; Popovski, Petar

    2016-01-01

    We study a communication framework for nonlinear multibus DC MicroGrids based on a deliberate modification of the parameters of the primary control and termed power talk. We assess the case in which the information is modulated in the deviations of reference voltages of the primary control loops...

  1. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    International Nuclear Information System (INIS)

    Druce, D.

    2004-01-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs

  2. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2006-01-01

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We use a method based on nonlinear programming (NLP), namely quadratic programming, to consider hydroelectric power generation a function of water discharge and of the head. The method has been applied successfully to solve a test case based on a realistic cascaded hydro system with a negligible computational time requirement and is also applied to show that the role played by reservoirs in the hydro chain do not depend only on their relative position. As a new contribution to earlier studies, which presented reservoir operation rules mainly for medium and long-term planning procedures, we show that the physical data defining hydro chain parameters used in the nonlinear model have an effect on the STHS, implying different optimal storage trajectories for the reservoirs accordingly not only with their position in the hydro chain but also with the new parameterisation defining the data for the hydro system. Moreover, considering head dependency in the hydroelectric power generation, usually neglected for hydro plants with a large storage capacity, provides a better short-term management of the conversion of the potential energy available in the reservoirs into electric energy, which represents a major advantage for the hydroelectric utilities in a competitive electricity market. (author)

  3. Notes for remarks by William A. Farlinger, chairman of Ontario Hydro

    International Nuclear Information System (INIS)

    Farlinger, W.A.

    1997-01-01

    The advantages of convergence for gas and electric companies were discussed. Both utilities possess transmission lines, rights of way, billing systems and long-term customer relationships. The speaker, Chairman of Ontario Hydro, suggested that within a few years, customers may be in a position to choose their power supplier. Ontario Hydro's vision for convergence and the recent restructuring of the Corporation into three new signature companies (generation, transmission, retail) were described. In this process Ontario Hydro has taken steps toward open access to the grid by all producers, competition among many sellers and buyers, and choice of supplier by consumers for lower cost power. One of the basic driving forces for convergence in the energy field is the interchangeability of electricity or gas. Some municipalities have already implemented joint gas and electricity meter reading, and there are many other ways in which converge can provide cheaper power and better service to the consumer. Ultimately, convergence would mean that monopolies would disappear, as would the boundaries between the gas and electricity industries

  4. Analysis of a pico tubular-type hydro turbine performance by runner blade shape using CFD

    Science.gov (United States)

    Park, J. H.; Lee, N. J.; Wata, J. V.; Hwang, Y. C.; Kim, Y. T.; Lee, Y. H.

    2012-11-01

    There has been a considerable interest recently in the topic of renewable energy. This is primarily due to concerns about environmental impacts of fossil fuels. Moreover, fluctuating and rising oil prices, increase in demand, supply uncertainties and other factors have led to increased calls for alternative energy sources. Small hydropower, among other renewable energy sources, has been evaluated to have adequate development value because it is a clean, renewable and abundant energy resource. In addition, small hydropower has the advantage of low cost development by using rivers, agricultural reservoirs, sewage treatment plants, waterworks and water resources. The main concept of the tubular-type hydro turbine is based on the difference in water pressure levels in pipe lines, where the energy which was initially wasted by using a reducing valve at the pipeline of waterworks, is collected by turbine in the hydro power generator. In this study, in order to acquire the performance data of a pico tubular-type hydro turbine, the output power, head and efficiency characteristics by different runner blade shapes are examined. The pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  5. Small hydro-electric potential: west Poverty Bay region

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    This study has identified six schemes in the Bay of Plenty Electric Power Board area and two in the Poverty Bay Electric Power Board area, of which five and one, respectively, are below the economic limit of $2400/kW suggested by the Ministry of Works and Development as of December 1979. Of these, only three appear both economically and environmentally acceptable. The Takaputahi and Torere schemes are not likely to proceed if the Ministry of Works and Development continue with their plans to develop the Motu River. Furthermore, the Motu Falls scheme is unlikely to proceed for environmental reasons. The schemes identified are not very attractive on the national scale and could not be justified on local terms. However, a detailed feasibility study of the Takaputahi/Torere diversion should be undertaken prior to a decision being made to proceed with the Motu development, or if the proposals are dropped. The present low load and slow growth of the area is such that prior to a small hydro-electric scheme being built, there would need to be an established demand for power.

  6. Power control for wind turbines in weak grids: Concepts development

    DEFF Research Database (Denmark)

    Bindner, H.

    1999-01-01

    will make wind power more firm and possible to connect to weaker grids. So, when the concept is matured, theexpectation is that for certain wind power installations, the cost of the power control is paid back as added wind power capacity value and saved grid reinforcement costs. Different systems...... and analyze methods and technologies for making it viable to utilize more of the wind potential in remote areas. The suggestion is to develop a power control concept for wind turbines which will even out thepower fluctuations and make it possible to increase the wind energy penetration. The main options...... are to combine wind power with a pumped hydro power storage or with an AC/DC converter and battery storage. The AC/DC converter can either be an "add-on" typeor it can be designed as an integrated part of a variable speed wind turbine. The idea is that combining wind power with the power control concept...

  7. Optimal economic and environment operation of micro-grid power systems

    International Nuclear Information System (INIS)

    Elsied, Moataz; Oukaour, Amrane; Gualous, Hamid; Lo Brutto, Ottavio A.

    2016-01-01

    Highlights: • Real-time energy management system for Micro-Grid power systems is introduced. • The management system considered cost objective function and emission constraints. • The optimization problem is solved using Binary Particle Swarm Algorithm. • Advanced real-time interface libraries are used to run the optimization code. - Abstract: In this paper, an advanced real-time energy management system is proposed in order to optimize micro-grid performance in a real-time operation. The proposed strategy of the management system capitalizes on the power of binary particle swarm optimization algorithm to minimize the energy cost and carbon dioxide and pollutant emissions while maximizing the power of the available renewable energy resources. Advanced real-time interface libraries are used to run the optimization code. The simulation results are considered for three different scenarios considering the complexity of the proposed problem. The proposed management system along with its control system is experimentally tested to validate the simulation results obtained from the optimization algorithm. The experimental results highlight the effectiveness of the proposed management system for micro-grids operation.

  8. Vaye-Planaz drinking-water hydro-power installation; Petite centrale hydro-electrique de Vaye-Planaz sur le reseau d'eau potable de la commune de Grone. Etude de faisabilite. Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-02-15

    This final report for the Swiss Federal Office of Energy (SFOE) presents the concept for a hydro-power installation that uses an existing drinking-water supply system. The report takes a look at the present situation which features ground-water sources, a transport pipeline and two reservoirs. The concept for the use of the available water pressure due to height-difference to drive a turbine and so generate electricity is described. Variants considered are reviewed. Investment and operating costs are examined as are the electricity production and the cost of the power generated. Finally, investments and other financial aspects are looked at and the further course of action is discussed.

  9. HydroSHEDS: A global comprehensive hydrographic dataset

    Science.gov (United States)

    Wickel, B. A.; Lehner, B.; Sindorf, N.

    2007-12-01

    The Hydrological data and maps based on SHuttle Elevation Derivatives at multiple Scales (HydroSHEDS) is an innovative product that, for the first time, provides hydrographic information in a consistent and comprehensive format for regional and global-scale applications. HydroSHEDS offers a suite of geo-referenced data sets, including stream networks, watershed boundaries, drainage directions, and ancillary data layers such as flow accumulations, distances, and river topology information. The goal of developing HydroSHEDS was to generate key data layers to support regional and global watershed analyses, hydrological modeling, and freshwater conservation planning at a quality, resolution and extent that had previously been unachievable. Available resolutions range from 3 arc-second (approx. 90 meters at the equator) to 5 minute (approx. 10 km at the equator) with seamless near-global extent. HydroSHEDS is derived from elevation data of the Shuttle Radar Topography Mission (SRTM) at 3 arc-second resolution. The original SRTM data have been hydrologically conditioned using a sequence of automated procedures. Existing methods of data improvement and newly developed algorithms have been applied, including void filling, filtering, stream burning, and upscaling techniques. Manual corrections were made where necessary. Preliminary quality assessments indicate that the accuracy of HydroSHEDS significantly exceeds that of existing global watershed and river maps. HydroSHEDS was developed by the Conservation Science Program of the World Wildlife Fund (WWF) in partnership with the U.S. Geological Survey (USGS), the International Centre for Tropical Agriculture (CIAT), The Nature Conservancy (TNC), and the Center for Environmental Systems Research (CESR) of the University of Kassel, Germany.

  10. Tsuwalhkalh Ti Tmicwa (The Land is Ours): Stat'imc Self-Determination in the Face of Large-Scale Hydro-electric Development

    Science.gov (United States)

    Moritz, Sarah Carmen

    In Canada, First Nations asserting authority over their lands are developing diverse strategies to overcome the state''s dogmatic insistence on jurisdictional sovereignty. This movement corresponds to the wider context of the challenges faced by indigenous people to use their own ways of knowing to resist or reformulate legal doctrines and political tenets based on colonial power. Interior Salish Stat'imc people identify themselves through a strong and ongoing social relationship with Sataqwa7, the Fraser River, and the "Valley of Plenty"---now known as the flooded Bridge River Valley---maintained through Stat'imc knowledge and cultural practice and demonstrated by talk of '"the Stat'imc right to fish" and Tsuwalhkalh Ti Tmicwa (The Land is Ours). Stat'imc fishers are prepared to contest and resist any regulatory system that is understood to impact this right to fish while they advocate their own ways of sustainable fishing and water management. Based on ethnographic research in collaboration with Stat'imc people, this thesis explores some of these often successful contestations especially in the context of increasing territorial governance and by example of the rapidly transforming relationship between Stat'imc, BC Hydro and the Province of BC. Interior Salish Stat'imc people are currently navigating through a significant phase of increasing jurisdiction and authority and recognition of (unsettled) territorial property relationships. This very dynamic process is marked by strategic collaborations, compensation for 'infringements' on St'a'imc Title and Rights, and conservation efforts to protect their home. An important example is the changing relationship between Stat'imc people and BC Hydro---a relationship between two groups with radically different cultures and agendas: Stat'imc people in a struggle for self-determination, social justice and cultural survival and BC Hydro, a corporate culture, with the agenda to provide hydro-electric power to BC, maintain

  11. Reactive Inkjet Printing of Biocompatible Enzyme Powered Silk Micro-Rockets.

    Science.gov (United States)

    Gregory, David A; Zhang, Yu; Smith, Patrick J; Zhao, Xiubo; Ebbens, Stephen J

    2016-08-01

    Inkjet-printed enzyme-powered silk-based micro-rockets are able to undergo autonomous motion in a vast variety of fluidic environments including complex media such as human serum. By means of digital inkjet printing it is possible to alter the catalyst distribution simply and generate varying trajectory behavior of these micro-rockets. Made of silk scaffolds containing enzymes these micro-rockets are highly biocompatible and non-biofouling. © 2016 The Authors. Published by WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  12. Micro-electro-mechanical systems (MEMS)-based micro-scale direct methanol fuel cell development

    International Nuclear Information System (INIS)

    Yao, S.-C.; Tang Xudong; Hsieh, C.-C.; Alyousef, Yousef; Vladimer, Michael; Fedder, Gary K.; Amon, Cristina H.

    2006-01-01

    This paper describes a high-power density, silicon-based micro-scale direct methanol fuel cell (DMFC), under development at Carnegie Mellon. Major issues in the DMFC design include the water management and energy-efficient micro fluidic sub-systems. The air flow and the methanol circulation are both at a natural draft, while a passive liquid-gas separator removes CO 2 from the methanol chamber. An effective approach for maximizing the DMFC energy density, pumping the excess water back to the anode, is illustrated. The proposed DMFC contains several unique features: a silicon wafer with arrays of etched holes selectively coated with a non-wetting agent for collecting water at the cathode; a silicon membrane micro pump for pumping the collected water back to the anode; and a passive liquid-gas separator for CO 2 removal. All of these silicon-based components are fabricated using micro-electro-mechanical systems (MEMS)-based processes on the same silicon wafer, so that interconnections are eliminated, and integration efforts as well as post-fabrication costs are both minimized. The resulting fuel cell has an overall size of one cubic inch, produces a net output of 10 mW, and has an energy density three to five times higher than that of current lithium-ion batteries

  13. Micro combustion in sub-millimeter channels for novel modular thermophotovoltaic power generators

    International Nuclear Information System (INIS)

    Pan, J F; Tang, A K; Duan, L; Li, X C; Yang, W M; Chou, S K; Xue, H

    2010-01-01

    The performance of micro combustion-driven power systems is strongly influenced by the combustor structure. A novel modular thermophotovoltaic (TPV) power generator is presented, which is based on the sub-millimeter parallel plate combustor. It has the potential to achieve a high power density because of the high radiation energy per unit volume due to the high surface-to-volume ratio of the micro-combustor. The work experimentally investigated the ignition limitation for two micro-combustors. It also studied the effects of three major parameters on a sub-millimeter combustor, namely hydrogen to oxygen mixing ratio, hydrogen volumetric flow rate and nozzle geometry. The results show that the combustion efficiency decreases with the increase of the hydrogen flow rate, which is caused by reduced residence time. The average wall temperature with the rectangular nozzle is 25 K higher than that with the circle nozzle. The output electrical power and power density of the modular TPV power generator are projected to be 0.175 W and 0.0722 W cm −3 respectively. We experimentally achieve 0.166 W of electrical power, which is in good agreement with the model prediction

  14. Hydro-Quebec's environmental policy

    International Nuclear Information System (INIS)

    1996-10-01

    Hydro-Quebec established a new environmental policy on August 1, 1996. A summary of the policy was presented. According to this policy statement the utility undertakes to recognize the environmental implications of its activities and assumes responsibilities for these implications by integrating them into its corporate decision-making processes. The following general principles and means of implementation have been highlighted: (1) sustainable development, (2) strict, responsible environmental management, (3) environmental research, (4) enhancement of activities and facilities, (5) information, consultation and dialogue, and (6) environmental responsibility of Hydro-Quebec personnel, subsidiaries and business partners

  15. The HydroServer Platform for Sharing Hydrologic Data

    Science.gov (United States)

    Tarboton, D. G.; Horsburgh, J. S.; Schreuders, K.; Maidment, D. R.; Zaslavsky, I.; Valentine, D. W.

    2010-12-01

    The CUAHSI Hydrologic Information System (HIS) is an internet based system that supports sharing of hydrologic data. HIS consists of databases connected using the Internet through Web services, as well as software for data discovery, access, and publication. The HIS system architecture is comprised of servers for publishing and sharing data, a centralized catalog to support cross server data discovery and a desktop client to access and analyze data. This paper focuses on HydroServer, the component developed for sharing and publishing space-time hydrologic datasets. A HydroServer is a computer server that contains a collection of databases, web services, tools, and software applications that allow data producers to store, publish, and manage the data from an experimental watershed or project site. HydroServer is designed to permit publication of data as part of a distributed national/international system, while still locally managing access to the data. We describe the HydroServer architecture and software stack, including tools for managing and publishing time series data for fixed point monitoring sites as well as spatially distributed, GIS datasets that describe a particular study area, watershed, or region. HydroServer adopts a standards based approach to data publication, relying on accepted and emerging standards for data storage and transfer. CUAHSI developed HydroServer code is free with community code development managed through the codeplex open source code repository and development system. There is some reliance on widely used commercial software for general purpose and standard data publication capability. The sharing of data in a common format is one way to stimulate interdisciplinary research and collaboration. It is anticipated that the growing, distributed network of HydroServers will facilitate cross-site comparisons and large scale studies that synthesize information from diverse settings, making the network as a whole greater than the sum of its

  16. Micro combined heat and power operating on renewable energy for residential building

    International Nuclear Information System (INIS)

    Aoun, Bernard

    2008-01-01

    The building sector consumes more than 43% of the total national energy consumption in France leading to more than 25% of CO 2 emissions associated to this energy consumption. A large number of options exist to limit CO 2 emissions and to improve the performance of buildings. One of these options is developed in this thesis, the use of renewable energies (solar and biomass) in combined production of heat and power. Conventional systems of combined heat and power production are briefly analyzed. The major part of this work has been focused on the development of a micro-CHP system based on an organic Rankine cycle operating on renewable energies intermittent and non-intermittent (solar and wood). The working fluids have been analyzed to allow reaching high thermodynamic performance. The different promising technologies, for each components of the system are identified, depending on the working fluid. A special test bench has been designed and realized to test and characterize an oil-free vapor scroll expander suitable for our application. The different components have been sized using computerized tools developed for the modeling of the Organic Rankine cycle. A dynamic simulation tool has been developed to simulate the annual performance of the micro-CHP system operating under different climate conditions and thermal loads. Results show that the micro-CHP system could save more than 40% of the primary energy consumption and up to 60% of CO 2 emissions. The Levelized electricity cost has been calculated using economic analysis; results show that the electricity cost (50 c-euros/kWhel) is still high compared to other technologies. (author)

  17. The Nothuesli small hydro project; Wasserkraftwerk Nothuesli, Gonzenbaechli - Vorprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Balachandran, S.; Jorde, K.

    2008-07-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  18. Power Generation Strategy Development in Croatia

    International Nuclear Information System (INIS)

    Curkovic, A.; Androcec, I.; Tarnik, T.

    2010-01-01

    Electricity generation as an economic sector contributes to the national GDP through increasing investments and exports. In the period from 2000 to 2008 the annual growth rate of final electricity demand was 3,8% which was higher than for any other energy form. Almost 1200 MW of thermal power plants will go out of system due to lifetime (more than 30 years). Energy Strategy is a basic document of the Energy Act with the purpose to define energy policy and future plans for energy development of the Republic of Croatia till 2020. Based on the adopted strategy the Government will create the Energy Strategy Implementation Programme for the four-year period. Croatian's energy development should be based on best available technologies as well as on energy-related, economic and environmental assessment of all available energy options. Energy strategy of Croatia (NN 130/09) puts up next goals: 300 MW hydro power plants (bigger than 10 MW), 1200 MW gas-fired thermal power plants (including 300 MW of cogeneration), 1200 MW of coal-fired thermal power plants, and 35% of renewable (including hydro). The market, i.e. a competitive generation, is the driving force in the construction of new power plants. The main stimulus for the construction is the possibility of definite return of invested capital as well as earning of reasonable profit for investors. Choose of location, environmental impact and competitiveness are main criteria for decision making. Technological and financial terms of new power plant is under influence of the law of supply and demand, so short marginal costs are in the first view - power plant life is at least 30 years - how to deal with this conditions, who will invest in long-term projects with condition of short pay-back period. Climate change and greenhouse gas emissions have become a priority development issue. The main challenge is a long-term development of economy with decreased emission of carbon dioxide. Kyoto protocol obligations, Copenhagen Accord

  19. High-power density miniscale power generation and energy harvesting systems

    International Nuclear Information System (INIS)

    Lyshevski, Sergey Edward

    2011-01-01

    This paper reports design, analysis, evaluations and characterization of miniscale self-sustained power generation systems. Our ultimate objective is to guarantee highly-efficient mechanical-to-electrical energy conversion, ensure premier wind- or hydro-energy harvesting capabilities, enable electric machinery and power electronics solutions, stabilize output voltage, etc. By performing the advanced scalable power generation system design, we enable miniscale energy sources and energy harvesting technologies. The proposed systems integrate: (1) turbine which rotates a radial- or axial-topology permanent-magnet synchronous generator at variable angular velocity depending on flow rate, speed and load, and, (2) power electronic module with controllable rectifier, soft-switching converter and energy storage stages. These scalable energy systems can be utilized as miniscale auxiliary and self-sustained power units in various applications, such as, aerospace, automotive, biotechnology, biomedical, and marine. The proposed systems uniquely suit various submersible and harsh environment applications. Due to operation in dynamic rapidly-changing envelopes (variable speed, load changes, etc.), sound solutions are researched, proposed and verified. We focus on enabling system organizations utilizing advanced developments for various components, such as generators, converters, and energy storage. Basic, applied and experimental findings are reported. The prototypes of integrated power generation systems were tested, characterized and evaluated. It is documented that high-power density, high efficiency, robustness and other enabling capabilities are achieved. The results and solutions are scalable from micro (∼100 μW) to medium (∼100 kW) and heavy-duty (sub-megawatt) auxiliary and power systems.

  20. Development of high, medium and low oil content hydro cyclones; Desenvolvimento de hidrociclones para altos, medios e baixos teores de oleo

    Energy Technology Data Exchange (ETDEWEB)

    Moraes, Carlos Alberto Capela; Marins, Luiz Philipe Martinez; Melo, Darley Carrijo de; Silva, Fabricio Soares da [Centro de Pesquisas da Petrobras (CENPES). Gerencia de Tecnologia de Processamento e Avaliacao de Petroleo (Brazil)], e-mails: capela@petrobras.com.br, philipe@petrobras.com.br, darley@petrobras.com.br, fabriciosoares@petrobras.com.br; Oliveira Junior, Joao Americo Aguirre [Engineering Simulation and Scientific Software (ESSS), Florianopolis, SC (Brazil)], e-mail: aguirre@esss.com.br; Souza, Marcos Aurelio de; Barca, Luiz Fernando [Universidade Federal de Itajuba. Instituto de Engenharia Mecanica, MG (Brazil)], e-mails: maurelio@unifei.edu.br, barca@unifei.edu.br; Souza, Adriana Margarida Rodrigues Ferreira de [Fundacao Gorceix (Brazil)], e-mail: adrianamargarida.gorceix@petrobras.com.br; Almeida, Cristina Santos de [Universidade Federal do Rio de Janeiro. Fundacao de Coordenacao de Projetos, Pesquisa e Estudos Tecnologicos (COPPETEC/UFRJ). Escola de Quimica, RJ (Brazil)], e-mail: cristinaalmeida.coppetec@petrobras.com.br

    2008-12-15

    This paper is intended to describe the steps and present the results of a Research and Development (P and D) project aimed at developing and qualifying hydro cyclones for oil and water primary separation by PETROBRAS. The hydro cyclones families for high, medium and low oil content, respectively named as ATO, MTO and BTO were developed in this project and are currently in the patent filing phase. The members of each one of them were initially conceived and analyzed by means of numeric simulations (CFD). The set-ups for these simulations were based on experimental investigation supplemental papers of the fluid-dynamics in hydro cyclones, with the use of Laser Doppler Anemometry (LDA and PIV) in acrylic models. After the selection of the geometries for optimum performance at the CFD, actual size steel prototypes were designed and built for each one of the aforementioned hydro cyclones families. It was also designed and built a two-skid mounted system and one control rack which comprise a Mobile Lab for Hydro cyclone Tests (LMTH, being the acronym in Portuguese) with which field tests were carried out (Buracica Field, Bahia) in the prototypes. As the last phase of the Research and Development (R and D) project, it was prepared a computer routine which allows the performance of a project of a compact separation system for any specific application, using the hydro cyclones of the families aforementioned in series in the streams rich in water. This routine enables, from the features of the fluids in the application in particular, to select the most appropriate hydro cyclone to be used, obtain their corresponding operating conditions and also to obtain an estimate of the minimum performance range expected in the application under analysis. (author)

  1. Hydro-climatology

    DEFF Research Database (Denmark)

    The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal with under......The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal...... considered. The interdisciplinary approach reveals information and perspective that go beyond the study of cli ate and hydro gy alone...

  2. Optimal Sizing Of An Off-Grid Small Hydro-Photovoltaic-Diesel Generator Hybrid Power System For A Distant Village

    Directory of Open Access Journals (Sweden)

    Adebanji B.

    2017-08-01

    Full Text Available This paper presented an optimal sizing technique for an off-grid hybrid system consisting of Small Hydro SHP system Photovoltaic PV modules Battery BATT banks and Diesel Generator DG. The objective cost function Annualized Cost System and the Loss of Power Supply Probability LPSP were minimized with application of Genetic Algorithm GA in order to reduce the Cost of Energy COE generation. GA compared to other convectional optimization methods has the ability to attain global optimum easily. The decision variables are the number of small hydro turbines NSHP number of solar panels NPV number of battery banks NBATT and the capacity of DG PDG. The proposed method was applied to a typical rural village Itapaji-Ekiti in Nigeria. The monthly average solar irradiance data were converted into hourly solar irradiance data for uniformity. Sensitivity analysis was also performed to identify the most important parameter influencing the optimized hybrid system. The optimal sizing result of the HPS is 954 kW of SHP 290 kW of PV panels 9500 sets of 600Ah battery strings and 350 kW of DG. The optimal Loss of Power Supply Probability LPSP is 0.0054 and the Renewable Fraction RF is 0.62 which is indeed a significant improvement on the environment and comparatively better than any other combinations in the system.

  3. Overview of Hydrometeorologic Forecasting Procedures at BC Hydro

    Science.gov (United States)

    McCollor, D.

    2004-12-01

    Energy utility companies must balance production from limited sources with increasing demand from industrial, business, and residential consumers. The utility planning process requires a balanced, efficient, and effective distribution of energy from source to consumer. Therefore utility planners must consider the impact of weather on energy production and consumption. Hydro-electric companies should be particularly tuned to weather because their source of energy is water, and water supply depends on precipitation. BC Hydro operates as the largest hydro-electric company in western Canada, managing over 30 reservoirs within the province of British Columbia, and generating electricity for 1.6 million people. BC Hydro relies on weather forecasts of watershed precipitation and temperature to drive hydrologic reservoir inflow models and of urban temperatures to meet energy demand requirements. Operations and planning specialists in the company rely on current, value-added weather forecasts for extreme high-inflow events, daily reservoir operations planning, and long-term water resource management. Weather plays a dominant role for BC Hydro financial planners in terms of sensitive economic responses. For example, a two percent change in hydropower generation, due in large part to annual precipitation patterns, results in an annual net change of \\50 million in earnings. A five percent change in temperature produces a \\5 million change in yearly earnings. On a daily basis, significant precipitation events or temperature extremes involve potential profit/loss decisions in the tens of thousands of dollars worth of power generation. These factors are in addition to environmental and societal costs that must be considered equally as part of a triple bottom line reporting structure. BC Hydro water resource managers require improved meteorological information from recent advancements in numerical weather prediction. At BC Hydro, methods of providing meteorological forecast data

  4. Nuclear process steam for industry: potential for the development of an Industrial Energy Park adjacent to the Bruce Nuclear Power Development

    Energy Technology Data Exchange (ETDEWEB)

    Seddon, W A

    1981-11-01

    This report summarizes the results of an industrial survey jointly funded by the Bruce County Council, the Ontario Energy Corporation, Atomic Energy of Canada Limited and conducted with the cooperation of Ontario Hydro and the Ontario Ministry of Industry and Tourism. The objective of the study was to identify and assess the future needs and interest of energy-intensive industries in the concept of an Industrial Energy Park adjacent tof the Bruce Nuclear Power Development. The proposed Energy Park would capitalize on the infrastructure of the existing CANDU reactors and Ontario Hydro's proven and unique capability to produce steam, as well as electricity, at a cost currently about half that from a comparable coal-fired station.

  5. Green power programs in Canada : 2003 : overview of Government green power policies, utility green power implementation initiatives, green power and certificate marketing programs, and their benefits

    International Nuclear Information System (INIS)

    Whitmore, J.; Bramley, M.; Holmes, R.

    2004-09-01

    Green power is defined as electricity produced from renewable sources, and whose production has low adverse impacts on the environment, human health and communities. Green power has near-zero greenhouse gas (GHG) emissions and includes sources such as wind, hydro, and solar power. It offers several environmental benefits, as well as the enhancement of energy security, regional development, economic diversification and the creation of skilled jobs. There are four categories of programs related to green power development in Canada: government green power policies, utility green power development programs, green power marketing initiatives, and green power certificate marketing initiatives. Most of the activities in Canada associated with these four categories in 2003 were discussed in this report. However, difficulties with quantification prevented the inclusion of some green power activities such as (1) the generation of green power not certified or identified by the generator as green power, (2) industry or residential self-generation, (3) net metering, and (4) small government programs. Green power generation facilities in 2003 totaled 775 MW of capacity compared to 539 MW in 2002. Hydro capacity represented 41 per cent, followed by wind capacity at 40 per cent and wood waste at 17 per cent. Most of the green power generation facilities in 2003 were located in Alberta, followed by British Columbia, Ontario and Quebec. 230 refs., 8 tabs., 1 fig

  6. Incentive Mechanism of Micro-grid Project Development

    Directory of Open Access Journals (Sweden)

    Yong Long

    2018-01-01

    Full Text Available Due to the issue of cost and benefit, the investment demand and consumption demand of micro-grids are insufficient in the early stages, which makes all parties lack motivation to participate in the development of micro-grid projects and leads to the slow development of micro-grids. In order to promote the development of micro-grids, the corresponding incentive mechanism should be designed to motivate the development of micro-grid projects. Therefore, this paper builds a multi-stage incentive model of micro-grid project development involving government, grid corporation, energy supplier, equipment supplier, and the user in order to study the incentive problems of micro-grid project development. Through the solution and analysis of the model, this paper deduces the optimal subsidy of government and the optimal cooperation incentive of the energy supplier, and calculates the optimal pricing strategy of grid corporation and the energy supplier, and analyzes the influence of relevant factors on optimal subsidy and incentive. The study reveals that the cost and social benefit of micro-grid development have a positive impact on micro-grid subsidy, technical level and equipment quality of equipment supplier as well as the fact that government subsidies positively adjust the level of cooperation incentives and price incentives. In the end, the validity of the model is verified by numerical analysis, and the incentive strategy of each participant is analyzed. The research of this paper is of great significance to encourage project development of micro-grids and to promote the sustainable development of micro-grids.

  7. Upstream fish migration. Report of the hydro power panel of experts; Fischaufstieg. Bericht aus der Expertengruppe Wasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    Roger, Sebastian [RWE Innogy GmbH, Essen (Germany). Asset Management Hydro National; Kaefer, Sabine [Verbund Hydro Power AG, Villach (Austria); Ulrich, Jochen [EDH Energiedienst Holding AG, Laufenburg (Switzerland). Oekologie und Werkdienst; Zemanek, Friedrich [evn naturkraft Erzeugungsgesellschaft m.b.H., Maria Enzersdorf (Austria)

    2013-10-01

    In recent years, ecological regulations and environmental demands have steadily increased on European, national, and on Federal State level. One key issue of Federal implementations of the European water framework directive is to achieve the environmental targets by establishing the passability for fish. In support of its member companies, VGB (TC 'Hydro Power Plants') set up a transnational expert group. This group was to analyse, compare, and evaluate different essential guidelines for fish passes and residual flows including the exchange of experience and the provision of practical examples. (orig.)

  8. Dynamic Model for Hydro-Turbine Generator Units Based on a Database Method for Guide Bearings

    Directory of Open Access Journals (Sweden)

    Yong Xu

    2013-01-01

    Full Text Available A suitable dynamic model of rotor system is of great significance not only for supplying knowledge of the fault mechanism, but also for assisting in machine health monitoring research. Many techniques have been developed for properly modeling the radial vibration of large hydro-turbine generator units. However, an applicable dynamic model has not yet been reported in literature due to the complexity of the boundary conditions and exciting forces. In this paper, a finite element (FE rotor dynamic model of radial vibration taking account of operating conditions is proposed. A brief and practical database method is employed to model the guide bearing. Taking advantage of the method, rotating speed and bearing clearance can be considered in the model. A novel algorithm, which can take account of both transient and steady-state analysis, is proposed to solve the model. Dynamic response for rotor model of 125 MW hydro-turbine generator units in Gezhouba Power Station is simulated. Field data from Optimal Maintenance Information System for Hydro power plants (HOMIS are analyzed compared with the simulation. Results illustrate the application value of the model in providing knowledge of the fault mechanism and in failure diagnosis.

  9. Micro hydrogen for portable power : generating opportunities for hydrogen and fuel cells

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    A new fuel cell technology for portable applications was reviewed. Success for the fuel cell industry will be achieved primarily by supplanting lithium-ion batteries, and fuel cells for portable applications have clear advantages to batteries in addition to their known environmental benefits. Micro hydrogen {sup TM} is the integrated combination of hydrogen fuel cell, hydrogen storage and delivery, fluidic interconnects and power conditioning electronics required for creating high energy density portable power sources. The small size, low heat production, environmental sustainability and refueling flexibility of the systems provides enormous economic opportunities for the use of micro hydrogen in cell phone technology, personal digital assistants and other electronic gadgets. Details of a trial to test and evaluate micro hydrogen fuel cell powered bike lights were presented. Further programs are planned for external demonstrations of high-beam search and rescue lighting, flashlights for security personnel and portable hydrogen power sources that will be used by multiple organizations throughout British Columbia. It was concluded that fuel cell technology must match the lithium-ion battery's performance by providing fast recharge, high energy density, and adaptability. Issues concerning refueling and portable and disposable cartridges for micro hydrogen systems were also discussed. 8 figs.

  10. Wind energy and Swiss hydro power

    International Nuclear Information System (INIS)

    Ott, W.; Baur, M.; Fritz, W.; Zimmer, Ch.; Feldmann, J.; Haubrich, H.-J.; Dany, G.; Schmoeller, H.; Hartmann, T.

    2004-01-01

    This report for the Swiss Federal Office of Energy (SFOE) examines the possibilities of using Switzerland's hydropower generation facilities as a means of control and as a capacity-reserve for a European power system that includes a considerable amount of wind-generated electricity. The aims of the study - the analysis of possible changes in power availability and of the relative importance of peak load compensation, economic optimisation potential for the use of Swiss hydropower and organisational aspects - are presented. Various methods for organising production timetables and trading are looked at, as are future developments in the European power market. Methods of assessment of the value of Swiss hydropower installations are discussed in detail and possibilities of increasing capacity are discussed. The report is concluded with recommendations on the participation of Swiss hydropower in the market for regulation energy and the development of associated strategies. Also, environmental aspects are examined and the influence of national wind-energy concepts are discussed

  11. NB Power's public safety perspective

    Energy Technology Data Exchange (ETDEWEB)

    Sisk, P [New Brunswick Power, Fredericton, NB (Canada)

    2009-07-01

    New Brunswick Power Generation (NB Power) - Genco operates and maintains one of North America's most diverse generating systems. It consists of 15 hydro, coal, oil and diesel-powered generating stations and supplies approximately 75 per cent of the in-province load. It also exports energy to neighbouring New England, Quebec, Prince Edward Island, and Nova Scotia. This presentation provided some history regarding public safety issues at NB Power. The Mactaquac generating system was discussed with particular reference to its activities, challenges and control measures such as signage, audible alarms, visuals, security fencing, and coast guard navigation buoys. Several recommendations were presented, such as developing a tool to conduct risk assessment at all hydro stations; developing a public safety campaign; installing booms where required; standardizing signs; evaluating security risks; and conducting pre-spill inspections to remove the public from dangerous areas. figs.

  12. A modified gravitational search algorithm based on a non-dominated sorting genetic approach for hydro-thermal-wind economic emission dispatching

    International Nuclear Information System (INIS)

    Chen, Fang; Zhou, Jianzhong; Wang, Chao; Li, Chunlong; Lu, Peng

    2017-01-01

    Wind power is a type of clean and renewable energy, and reasonable utilization of wind power is beneficial to environmental protection and economic development. Therefore, a short-term hydro-thermal-wind economic emission dispatching (SHTW-EED) problem is presented in this paper. The proposed problem aims to distribute the load among hydro, thermal and wind power units to simultaneously minimize economic cost and pollutant emission. To solve the SHTW-EED problem with complex constraints, a modified gravitational search algorithm based on the non-dominated sorting genetic algorithm-III (MGSA-NSGA-III) is proposed. In the proposed MGSA-NSGA-III, a non-dominated sorting approach, reference-point based selection mechanism and chaotic mutation strategy are applied to improve the evolutionary process of the original gravitational search algorithm (GSA) and maintain the distribution diversity of Pareto optimal solutions. Moreover, a parallel computing strategy is introduced to improve the computational efficiency. Finally, the proposed MGSA-NSGA-III is applied to a typical hydro-thermal-wind system to verify its feasibility and effectiveness. The simulation results indicate that the proposed algorithm can obtain low economic cost and small pollutant emission when dealing with the SHTW-EED problem. - Highlights: • A hybrid algorithm is proposed to handle hydro-thermal-wind power dispatching. • Several improvement strategies are applied to the algorithm. • A parallel computing strategy is applied to improve computational efficiency. • Two cases are analyzed to verify the efficiency of the optimize mode.

  13. Micro-battery Development using beta radioisotope

    International Nuclear Information System (INIS)

    Jung, H. K.; Cheong, Y. M.; Lee, N. H.; Choi, Y. S.; Joo, Y. S.; Lee, J. S.; Jeon, B. H.

    2007-06-01

    Nuclear battery which use the beta radiation sources emitting the low penetration radiation energy from radioisotope can be applied as the long term (more than 10 years) micro power source in MEMS and nano components. This report describes the basic concept and principles of nuclear micro-battery and its fabrication in space and military field. In particular direct conversion method is described by investigating the electron-hole generation and recombination in p-n junction of silicon betavoltaics with beta radiation

  14. Short-term hydro-thermal scheduling using particle swarm optimization method

    International Nuclear Information System (INIS)

    Yu, Binghui; Yuan, Xiaohui; Wang, Jinwen

    2007-01-01

    The approaches based on different particle swarm optimization (PSO) techniques are applied to solve the short-term hydro-thermal scheduling problem. In the proposed methods, many constraints of the hydro-thermal system, such as power balance, water balance, reservoir volume limits and the operation limits of hydro and thermal plants, are considered. The feasibility of the proposed algorithm is demonstrated through an example system, and the results are compared with the results of a genetic algorithm and evolutionary programming approaches. The experimental results show that all the PSO algorithms have the ability to achieve nearly global solutions, but a local version of PSO with inertia weight appears to be the best amongst all the PSOs in terms of high quality solution

  15. Flow-through shares for power development

    International Nuclear Information System (INIS)

    Howie, K.D.

    1999-01-01

    Financial advantages will occur to power producers in Ontario provided that they are innovative in raising capital needed to take advantage of opportunities offered by the Energy Competition Act of 1998. In the new electricity regime, the availability of long term non-recourse debt financing supported by long term power purchasing from Ontario Hydro will probably decrease. The issuance of flow-through shares is a form of financing that could by available to them for certain projects, and there is the probability that greater equity financing will be needed. These flow-through shares can give investors immediate tax savings, a potential favorable return on their equity investment, and a means of financing certain kinds of power projects

  16. The Meielsgrund and Turbach small hydro power stations in Saanen, Switzerland; PCH du Meielsgrund et PCH de Turbach - Rapports finaux

    Energy Technology Data Exchange (ETDEWEB)

    Cavin, G. [Stucky SA, Renens (Switzerland); Wagner, T. [Sigmaplan, Berne (Switzerland)

    2009-12-15

    These four final illustrated reports for the Swiss Federal Office of Energy (SFOE) deal with various aspects of two small hydro projects on two affluents of the river Saane in Switzerland. The first report presents two variants for the enhancement of the existing Meielsgrund installation as well as a new, parallel installation. The catchment area involved, available head, residual water quantities, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. The second report describes the project and discusses regional planning aspects, hydrological basics and environmental issues in connection with the renewal project, including details on invertebrates found in the stream and their relevance to fishing and nature protection issues. The third and fourth reports concern the Turbach small hydro installation. The topics discussed in these two reports are basically similar to those considered for the Meielsgrund installation.

  17. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland; Rehabilitation de la petite centrale de la Chocolatiere (Echandens - Bussigny)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-05-15

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18{sup th} century. A permanent license to use at most 3 m{sup 3}/s is available. The study concludes that the maximum flow rate of 6 m{sup 3}/s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m{sup 3}/s.

  18. Contribution to Quebec's economic development: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The activities of Hydro-Quebec are analyzed from the standpoint of their contribution to economic development and their support of regional development. The structuring effects of Hydro-Quebec's electricity supply activities are described, specifically the utility's role as an employer and an important agent of economic development by virtue of its purchasing power. The role played by research and development activities in the technological development of Quebec is discussed along with the contribution of those activities to new industrial developments. Finally, the impacts of electricity use on industrial development are considered. An analysis is presented of Hydro-Quebec's marketing activities and the options they afford. These marketing activities are aimed mainly at supporting economic development. The availability of reasonably priced electricity enhances the competitiveness of all industrial sectors, especially those for which electricity is a factor in siting. Furthermore, Hydro-Quebec can use its marketing activities to reinforce this comparative advantage. Hydro-Quebec can also support regional development by decentralizing operations, standardizing rates, and extending its marketing activities to the regions. 2 tabs

  19. Environmental management in the Hydro-Electric Commission

    International Nuclear Information System (INIS)

    Scanlon, A.

    1995-01-01

    The Tasmanian Hydro Electric Commission (HEC) is a large and diverse organization, providing electricity generation, transmission, distribution and retail services throughout Tasmania. It is a significant manager of Tasmania's land and water resources and, as a consequence, has important environmental responsibilities. This paper outlines the background to conflict with the environmental movement over power generation development projects in south western Tasmania and the development of an environmental policy. As part of the environmental policy, the HEC has prepared environmental reviews, audits and risk assessment and is currently developing and implementing a comprehensive environmental management system. The HEC sees the introduction of the environmental management system as demonstrating a commitment to continuing environmental improvement and in establishing itself as a Tasmanian and national leader in the area of environmental management. 1 tab., 2 figs., 4 refs

  20. A Full Hydro- and Morphodynamic Description of Breaker Bar Development

    DEFF Research Database (Denmark)

    Jacobsen, Niels Gjøl

    The present thesis considers a coupled modelling approach for hydro- and morphodynamics in the surf zone, which is based on a solution to the Reynolds Averaged Navier-Stokes (RANS) equations with a Volume of Fluid (VOF) closure for the surf tracking. The basis for the numerical approach is the su......The present thesis considers a coupled modelling approach for hydro- and morphodynamics in the surf zone, which is based on a solution to the Reynolds Averaged Navier-Stokes (RANS) equations with a Volume of Fluid (VOF) closure for the surf tracking. The basis for the numerical approach...

  1. Power trade: A mean to replace thermal to hydro power

    Energy Technology Data Exchange (ETDEWEB)

    Viladrich, Christian; Brun, Pierre; Pereira, Alice; Moustafa, Fatma

    2010-09-15

    In the framework of the Eastern Nile Power Trade Program Study a comprehensive generation and transmission expansion plan was established for Egypt, Ethiopia, and Sudan. The results show that an interconnection between these countries is profitable and has a positive impact on CO2 savings. A common development of power system and a power market can promote the regional cooperation to use the Nile waters for the benefit of the entire region.

  2. Combined hydro-wind generation bids in a pool-based electricity market

    International Nuclear Information System (INIS)

    Angarita, Jorge L.; Usaola, Julio; Martinez-Crespo, Jorge

    2009-01-01

    Present regulatory trends are promoting the direct participation of wind energy in electricity markets. The final result of these markets sets the production scheduling for the operation time, including a power commitment from the wind generators. However, wind resources are uncertain, and the final power delivered usually differs from the initial power committed. This imbalance produces an overcost in the system, which must be paid by those who produce it, e.g., wind generators among others. As a result, wind farm revenue decreases, but it could increase by allowing wind farms to submit their bids to the markets together with a hydro generating unit, which may easily modify its production according to the expected imbalance. This paper presents a stochastic optimization technique that maximizes the joint profit of hydro and wind generators in a pool-based electricity market, taking into account the uncertainty of wind power prediction. (author)

  3. An overview on small hydro in Brazil

    International Nuclear Information System (INIS)

    Filho, G.T.

    2008-01-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km 2 . It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  4. Micro power/heat cogeneration incorporating a stirling engine

    International Nuclear Information System (INIS)

    Luft, S.

    2003-01-01

    The Stirling-engine for CHP-purpose developed by SOLO is a trend-setting technology. It represents the most suspicious perspective apart from the fuel-cell technology in order to become suitable to the requirements of the future power supply in the focus of the sustainability and the decentralized energy supply. The charm of the Stirling technology is based on the external combustion: a so far not known variability with the primary energy choice as well as a life span substantially extending, wear-free operation are possible thereby. The external combustion reduces also the maintenance and the emissions in a measure not known with conventional engine technologies. The development steps are finished. The result is the world-wide first concept for the commercial, stationary application of decentralized micro-CHP on Stirling technology basis, which goes into series. (orig.) [de

  5. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D. [British Columbia Hydro, Vancouver, BC (Canada)

    2004-07-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs.

  6. Report on achievements in fiscal 1998. Development of technologies to put photovoltaic power generation systems into practical use - international joint demonstration and development of photovoltaic power generation systems (Demonstrative research on photovoltaic power and micro hydraulic power hybrid system); 1998 nendo taiyoko hatsuden system jitsuyoka gijutsu kaihatsu seika hokokusho. Taiyoko hatsuden system kokusai kyodo jissho kaihatsu (taiyoko micro suiryoku hybrid system jissho kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    A photovoltaic (PV) power plant is compounded with a micro hydroelectric (MH) power plant in Vietnam, who has a dry season and a rainy season, to structure a stabilized power supply system to compensate drawbacks of the respective systems. Full load operation is being performed to advance the development of technologies to optimize and improve the performance and reliability of the system. The works include (1) site surveys, and decision on a location to execute the demonstration research, (2) design of the system, and design and fabrication of devices, and (3) the building construction thereof. In Item (1), the location was decided at Trang Village, Vietnam from such installing conditions as annual average insolation, water channels for wheel turbines, energy complementing relations, load demand amount, and difficulty of installation. In Item (2), the system consists of PV:100 kW/MH:25 kW/control system, wherein the MH is an inductive generator. The Main devices include generators, batteries, inverters, system control panels, and a meteorological data recording device. In Item (3) land survey and development were completed. (NEDO)

  7. Planning and running of the hydro aggregates in the electric power system in the R. Macedonia

    International Nuclear Information System (INIS)

    Ilijovski, Igor

    2015-01-01

    The subject of the research in this master thesis is analysis of the main characteristics and control of the large Hydropower plants (HPPs) in the electric power system in R. Macedonia, which are subject to planning in the running tables. ELEM and MEPSO are using SCADA system for monitoring and control of the hydropower plants. The planning is a complex process where many aspects should be covered. With correct and optimal control of the hydro aggregates, depending on the hydrology, climate, elevation of the reservoirs and many other conditions, a better efficiency of the water resources usage may be obtained, which results in positive financial outcomes. (author)

  8. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  9. The micro power station of Verbois; Ouvrage Micro-centrale de Verbois

    Energy Technology Data Exchange (ETDEWEB)

    Quercia, P.; Martinez, J.-L. [Services industriels de Geneve, Service de l' electricite, Geneva (Switzerland)

    2005-07-01

    The policy of the public utilities of the City of Geneva includes the promotion of renewable energy and the conservation of the environment. The erection of the most important hydroelectric power plant in the canton of Geneva at Verbois, on the Rhone River dates back to the years 1938 to 1944. Several retrofits have been made since then, the last dating from 1996 to 1998. In 2000, due to ecological considerations, a fish ladder was added, resulting in a loss of generated power equivalent to a water flow of 2 m{sup 3}/s at a height of 18.35 meters. In order to compensate for this energy loss, a micro hydropower station with a maximum output power of 316 kW was added. It is fitted with a Francis turbine with horizontal axis and fixed opening; the rotation speed is 605 rpm. A reduced power output could be traced back to the deposition of solids on the grids upstream of the water supply duct. The necessary modifications are discussed.

  10. NASA Fuel Tank Wireless Power and Signal Study

    Science.gov (United States)

    Merrill, Garrick

    2015-01-01

    Hydro Technologies has developed a custom electronics and mechanical framework for interfacing with off-the-shelf sensors to achieve through barrier sensing solutions. The core project technology relies on Hydro Technologies Wireless Power and Signal Interface (Wi psi) System for transmitting data and power wirelessly using magnetic fields. To accomplish this, Wi psi uses a multi-frequency local magnetic field to produce magnetic fields capable of carrying data and power through almost any material such as metals, seawater, concrete, and air. It will also work through layers of multiple materials.

  11. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  12. A low power flash-FPGA based brain implant micro-system of PID control.

    Science.gov (United States)

    Lijuan Xia; Fattah, Nabeel; Soltan, Ahmed; Jackson, Andrew; Chester, Graeme; Degenaar, Patrick

    2017-07-01

    In this paper, we demonstrate that a low power flash FPGA based micro-system can provide a low power programmable interface for closed-loop brain implant inter- faces. The proposed micro-system receives recording local field potential (LFP) signals from an implanted probe, performs closed-loop control using a first order control system, then converts the signal into an optogenetic control stimulus pattern. Stimulus can be implemented through optoelectronic probes. The long term target is for both fundamental neuroscience applications and for clinical use in treating epilepsy. Utilizing our device, closed-loop processing consumes only 14nJ of power per PID cycle compared to 1.52μJ per cycle for a micro-controller implementation. Compared to an application specific digital integrated circuit, flash FPGA's are inherently programmable.

  13. Hydro-economic modelling in mining catchments

    Science.gov (United States)

    Ossa Moreno, J. S.; McIntyre, N.; Rivera, D.; Smart, J. C. R.

    2017-12-01

    Hydro-economic models are gaining momentum because of their capacity to model both the physical processes related to water supply, and socio-economic factors determining water demand. This is particularly valuable in the midst of the large uncertainty upon future climate conditions and social trends. Agriculture, urban uses and environmental flows have received a lot of attention from researchers, as these tend to be the main consumers of water in most catchments. Mine water demand, although very important in several small and medium-sized catchments worldwide, has received less attention and only few models have attempted to reproduce its dynamics with other users. This paper describes an on-going project that addresses this gap, by developing a hydro-economic model in the upper Aconcagua River in Chile. This is a mountain catchment with large scale mining and hydro-power users at high altitudes, and irrigation areas in a downstream valley. Relevant obstacles to the model included the lack of input climate data, which is a common feature in several mining areas, the complex hydrological processes in the area and the difficulty of quantifying the value of water used by mines. A semi-distributed model developed within the Water Evaluation and Planning System (WEAP), was calibrated to reproduce water supply, and this was complemented with an analysis of the value of water for mining based on two methods; water markets and an analysis of its production processes. Agriculture and other users were included through methods commonly used in similar models. The outputs help understanding the value of water in the catchment, and its sensitivity to changes in climate variables, market prices, environmental regulations and changes in the production of minerals, crops and energy. The results of the project highlight the importance of merging hydrology and socio-economic calculations in mining regions, in order to better understand trade-offs and cost of opportunity of using

  14. Multiuser Communication Through Power Talk in DC MicroGrids

    DEFF Research Database (Denmark)

    Angjelichinoski, Marko; Stefanovic, Cedomir; Popovski, Petar

    2016-01-01

    Power talk is a novel ultra narrow-band powerline communication (UNB-PLC) technique for communication among control units in MicroGrids (MGs). Unlike the existing UNB-PLC solutions, power talk does not require installation of additional dedicated communication hardware and, instead, uses only...... transmits at a time, and full duplex, where all units transmit and receive simultaneously. We apply the concepts of signaling space, where the power talk symbol constellations are constructed, and detection space, where the demodulation of the symbols is performed. The proposed communication technique...

  15. Fiscal 2000 report on the international joint verification of photovoltaic power generation system. Verification of hybrid system comprising photovoltaic power generation system and micro-hydroelectric power generation systems; 2000 nendo taiyoko hatsuden system kokusai kyodo jissho kaihatsu hokokusho. Taiyoko micro suiryoku hybrid system jissho kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    Research was conducted in Vietnam for the development of a hybrid system comprising a photovoltaic power generation system and a micro-hydroelectric power generation system. In verification test operation, data measurement had been under way for approximately 18 months since it was started in September 1999. The rate of days on which effective data were obtained throughout this period was 93.4%. Power generated by the micro-hydroelectric power generation system was 19.4kWh/d with so small a capacity factor of 3.2%. The capacity factor of the photovoltaic power generation system was again very small at 4.5% since the amount consumed by the load was as small as 131.0kWh/d. Weather data of solar radiation and precipitation were being collected smoothly. In the study of hybrid system optimization, the effect of inductor generator activation upon the inverter was taken up. In the study of capacity balance optimization between the constituent elements of the hybrid system, methodology was established and verified, and calculations were carried out. (NEDO)

  16. Small-scale hydro power plant on the main drinking water line La Rippaz in Bex, Switzerland - Feasibility study; Petite centrale hydraulique. Aduction d'eau potable La Rippaz. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Chapallaz, J.-M. [Jean-Marc Chapallaz, Ingenieur EPFL/SIA, Baulmes (Switzerland); Meylan, D. [Perret-Gentil et Rey et Associes SA, Ingenieurs civils et Ingenieurs Conseil EPF/SIA, Lausanne (Switzerland)

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) is a feasibility study for the replacement work of the drinking-water supply line from the location of the spring water collection to a water reservoir belonging to the rock-salt mining company 'Hotel des Salines' in Bex, Switzerland. Built 1887 and following years this water supply system has already been designed for power generation as well. However, a 40 kW micro-scale turbine has only been installed 2005 in the lower part of the water supply system (hydraulic head: 115 m). The new project includes the replacement of the existing piping by a penstock, the construction of a new water collection reservoir at the highest point, the construction of a new 300 kW hydro power plant using the upper part of the water supply system (hydraulic head: 520 m), and some improvements of the existing lower power plant. The available water flow rate lies in the range 57-70 l/s, all the year round. The question arising is whether this construction project could be financed by the benefit from the sale of electricity that could be produced by the two power plants. The authors of the study estimate the power production to be 2.5 kWh/y. If the electricity can be sold at least at CHF 0.20/kWh for 25 years this could finance the whole project that has an estimated cost of CHF 7,000,000.

  17. 76 FR 67175 - Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp...

    Science.gov (United States)

    2011-10-31

    ...; 14149-000] Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp... Lock Hydro Friends Fund XXXVI (Lock Hydro) and on April 11, 2011, Arkansas Electric Cooperative Corp... & Dam No. 3, as directed by the Corps. Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090...

  18. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  19. Mixed-integer nonlinear approach for the optimal scheduling of a head-dependent hydro chain

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-08-15

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We propose a novel mixed-integer nonlinear programming (MINLP) approach, considering hydroelectric power generation as a nonlinear function of water discharge and of the head. As a new contribution to earlier studies, we model the on-off behavior of the hydro plants using integer variables, in order to avoid water discharges at forbidden areas. Thus, an enhanced STHS is provided due to the more realistic modeling presented in this paper. Our approach has been applied successfully to solve a test case based on one of the Portuguese cascaded hydro systems with a negligible computational time requirement. (author)

  20. Evaluation of the small-scale hydro-energetic potential in micro-basins in Colombia

    International Nuclear Information System (INIS)

    Torres Q, E.; Castillo C, J.J.

    1995-01-01

    A definition of the small-scale hydroelectric power plants (PCHs, abbreviations in Spanish), its classification according to potency and fall and its classification as utilization form is present. The general parameters to PCHs design in aspects as topography studies, geology and geotechnical studies and hydrologic studies are described. The primary elements of a PCH, as dam (little dam), conduction, tank of charge, sand trap (water re claimer), floodgate, grating (network), pressure's pipe, fall, principal valve and turbine are shown. In the study of potential of micro-basins, general points as topography, draining, population, supply and demand of electric energy, morphology, hydrology, geology and hydraulic potential are consider

  1. CFD Modelling of a Pump as Turbine (PAT with Rounded Leading Edge Impellers for Micro Hydro Systems

    Directory of Open Access Journals (Sweden)

    Ismail Mohd Azlan

    2017-01-01

    Full Text Available A Pump as Turbine (PAT is one of micro hydro system components that is used to substitute a commercially available turbine due to its wide availability and low acquisition cost. However, PAT have high hydraulic losses due to differences in pump-turbine operation and hydraulic design. The fluid flowing inside the PAT is subjected to hydraulic losses due to the longer flow passage and unmatched fluid flow within the wall boundaries. This paper presents the effect of rounding the impeller leading edges of the pump on turbine performance. A CFD model of a PAT was designed to simulate virtual performance for the analysis. The aim of this study is to observe the internal hydraulic performance resulting from the changes in the performance characteristics. Highest efficiency was recorded at 17.0 l/s, an increase of 0.18%. The simulation results reveal that there is an improvement in hydraulic performance at overflow operation. The velocity vector visualization shows that there is a reduction in wake and consequently less flow separation along impeller flow passages. However, adjusting the sensitive impeller inlet geometry will also alter the velocity inlet vector and consequently change the velocity triangles for the turbo machinery system.

  2. Scalable fabrication of high-power graphene micro-supercapacitors for flexible and on-chip energy storage

    Science.gov (United States)

    El-Kady, Maher F.; Kaner, Richard B.

    2013-02-01

    The rapid development of miniaturized electronic devices has increased the demand for compact on-chip energy storage. Microscale supercapacitors have great potential to complement or replace batteries and electrolytic capacitors in a variety of applications. However, conventional micro-fabrication techniques have proven to be cumbersome in building cost-effective micro-devices, thus limiting their widespread application. Here we demonstrate a scalable fabrication of graphene micro-supercapacitors over large areas by direct laser writing on graphite oxide films using a standard LightScribe DVD burner. More than 100 micro-supercapacitors can be produced on a single disc in 30 min or less. The devices are built on flexible substrates for flexible electronics and on-chip uses that can be integrated with MEMS or CMOS in a single chip. Remarkably, miniaturizing the devices to the microscale results in enhanced charge-storage capacity and rate capability. These micro-supercapacitors demonstrate a power density of ~200 W cm-3, which is among the highest values achieved for any supercapacitor.

  3. High-power density miniscale power generation and energy harvesting systems

    Energy Technology Data Exchange (ETDEWEB)

    Lyshevski, Sergey Edward [Department of Electrical and Microelectronics Engineering, Rochester Institute of Technology, Rochester, NY 14623-5603 (United States)

    2011-01-15

    This paper reports design, analysis, evaluations and characterization of miniscale self-sustained power generation systems. Our ultimate objective is to guarantee highly-efficient mechanical-to-electrical energy conversion, ensure premier wind- or hydro-energy harvesting capabilities, enable electric machinery and power electronics solutions, stabilize output voltage, etc. By performing the advanced scalable power generation system design, we enable miniscale energy sources and energy harvesting technologies. The proposed systems integrate: (1) turbine which rotates a radial- or axial-topology permanent-magnet synchronous generator at variable angular velocity depending on flow rate, speed and load, and, (2) power electronic module with controllable rectifier, soft-switching converter and energy storage stages. These scalable energy systems can be utilized as miniscale auxiliary and self-sustained power units in various applications, such as, aerospace, automotive, biotechnology, biomedical, and marine. The proposed systems uniquely suit various submersible and harsh environment applications. Due to operation in dynamic rapidly-changing envelopes (variable speed, load changes, etc.), sound solutions are researched, proposed and verified. We focus on enabling system organizations utilizing advanced developments for various components, such as generators, converters, and energy storage. Basic, applied and experimental findings are reported. The prototypes of integrated power generation systems were tested, characterized and evaluated. It is documented that high-power density, high efficiency, robustness and other enabling capabilities are achieved. The results and solutions are scalable from micro ({proportional_to}100 {mu}W) to medium ({proportional_to}100 kW) and heavy-duty (sub-megawatt) auxiliary and power systems. (author)

  4. Electricity production by hydro power plants: possibilities of forecasting

    International Nuclear Information System (INIS)

    Barkans, J.; Zicmane, I.

    2004-01-01

    Hydro energy accounts for 17% of global electricity production and is the most important source of renewable energies actively used today, being at the same time the least influential ecologically. Its only disadvantages is that this kind of energy is difficult to forecast, which hinders not only the planning of tariffs, year budgets and investments, but also contractual negotiations in particular month. The paper shows that the forecasting of hydro energy production can be linked to certain natural processes, namely, to the cyclic behaviour observed for water flows of the world's rivers. The authors propose a method according to which the forecasting procedure is performed using the data of observations as signals applied to special digital filters transforming the water flow process into integral and differential forms, which after appropriate treatment are expected again in usual water flow units. For this purpose the water flow integral function is to be divided, by means of spectral analysis, into 'low-frequency' (with a semi-period of 44 years) and 'high-frequency' (4-6 year semi-periods) components, which are of different origin. Each of them should be forecasted separately, with the following summation of the results. In the research it is shown that the cyclic fluctuations of world rivers' water flows are directly associated with variations in the Solar activity. (authors)

  5. The effectiveness of new austrian tunnelling method (NATM for hydro power plant construction: lau gunung power plant, north sumatera, indonesia

    Directory of Open Access Journals (Sweden)

    Ade Khoir Rizki

    2017-01-01

    Full Text Available Hydro Electric Power Plant is a power generating system using gravity fall of water as the main force to move the turbine and generate electricity. The construction purpose of Lau Gunung hydropower (2×7. 5 MW that is located in Dairi, North Sumatra, is to Supply power to 14,000 house of the surrounding region. The river run-off system, where the water is immediately contained and then flowed through a tunnel considering the discharge flowing river, where it is constant and does not occur in the fluctuating water level. The Lau Gunung river has the minimum flow that can exceed from 15 to 25 m3/s with a high tunnel dimensions of 4 metres long, 3,9 metres wide and a length of 1,6 kilometres. In terms of the analysis of the time effectiveness of the NATM can be saved because of the continuous work of 24 hours, without any obstacles in which the sub methods used include the drilling & blasting. The tunnel then use the form of steel reinforcement rib and Safety shotcrete lining. The general review may show that using NATM result a tremendous savings, also the use of horse shape conduce small displacement which is effective for the construction.

  6. Parametric distribution approach for flow availability in small hydro potential analysis

    Science.gov (United States)

    Abdullah, Samizee; Basri, Mohd Juhari Mat; Jamaluddin, Zahrul Zamri; Azrulhisham, Engku Ahmad; Othman, Jamel

    2016-10-01

    Small hydro system is one of the important sources of renewable energy and it has been recognized worldwide as clean energy sources. Small hydropower generation system uses the potential energy in flowing water to produce electricity is often questionable due to inconsistent and intermittent of power generated. Potential analysis of small hydro system which is mainly dependent on the availability of water requires the knowledge of water flow or stream flow distribution. This paper presented the possibility of applying Pearson system for stream flow availability distribution approximation in the small hydro system. By considering the stochastic nature of stream flow, the Pearson parametric distribution approximation was computed based on the significant characteristic of Pearson system applying direct correlation between the first four statistical moments of the distribution. The advantage of applying various statistical moments in small hydro potential analysis will have the ability to analyze the variation shapes of stream flow distribution.

  7. Hybrid Energy System Design of Micro Hydro-PV-biogas Based Micro-grid

    Science.gov (United States)

    Nishrina; Abdullah, A. G.; Risdiyanto, A.; Nandiyanto, ABD

    2017-03-01

    Hybrid renewable energy system is an arrangement of one or more sources of renewable energy and also conventional energy. This paper describes a simulation results of hybrid renewable power system based on the available potential in an educational institution in Indonesia. HOMER software was used to simulate and analyse both in terms of optimization and economic terms. This software was developed through 3 main principles; simulation, optimization, and sensitivity analysis. Generally, the presented results show that the software can demonstrate a feasible hybrid power system as well to be realized. The entire demand in case study area can be supplied by the system configuration and can be met by ¾ of electricity production. So, there are ¼ of generated energy became an excess electricity.

  8. Effect of SiO2/Al2O3 Ratio on Micro-Mesopore Formation for Pt/Beta-MCM-41 via NaOH Treatment and the Catalytic Performance in N-heptane Hydro isomerization

    Science.gov (United States)

    Gao, Li; Shi, Zhiyuan; Liu, Yingming; Zhao, Yuanshou; Liu, Qinghua; Xu, Chengguo; Bai, Peng; Yan, Zifeng

    2018-01-01

    Micro-mesoporous composite material Beta-MCM-41(BM) were hydrothermally synthesized by treating parent beta with molar SiO2/Al2O3 ratios of 12.5, 20 and 30 as precursors. The influence of SiO2/Al2O3 ratio of zeolite beta on effective micro-mesoporous composite formation was studied by investigating the crystallinity, morphology, chemical composition, acidity and textural property of Beta-MCM-41 through XRD, nitrogen adsorption, SEM, TEM, NH3-TPD, FTIR and Pyridine-FTIR. The catalytic performance was evaluated in terms of n-heptane hydro isomerization. The results demonstrated that Beta-MCM-41 supported Pt catalysts showed higher selectivity to isoheptanes than Pt/Beta. It was attributed to the superiorities of the pore structure and mesoporous accelerated the diffusion of larger molecules of isoheptanes.

  9. Power Sources for Micro-Autonomous Vehicles- Challenges and Prospects

    Science.gov (United States)

    Narayan, S. R.; Kisor, A.; Valdez, T. I.; Manohara, H.

    2009-01-01

    Micro-autonomous vehicle systems are expected to have expanded role in military missions by providing full spectrum intelligence, surveillance and reconnaissance support on the battlefield, suppression of enemy defenses, and enabling co-operative (swarm-like) configurations. Of the numerous demanding requirements of autonomy, sensing, navigation, mobility, etc., meeting the requirement of mission duration or endurance is a very challenging one. This requirement is demanding because of the constraints of mass and volume that limit the quantity of energy that can be stored on-board. Energy is required for mobility, payload operation, information processing, and communication. Mobility requirements typically place an extraordinary demand on the specific energy (Wh/kg) and specific power (W/kg) of the power source; the actual distribution of the energy between mobility and other system functions could vary substantially with the mission type. The power requirements for continuous mobility can vary from 100-1000 W/kg depending on the terrain, ground speed and flight speed. Even with the power source accounting for 30% of the mass of the vehicle, the best of rechargeable batteries can provide only up to 1-2 hours of run-time for a continuous power demand at 100W/kg. In the case of micro-aerial vehicles with flight speed requirements in the range of 5-15 m s-1, the mission times rarely exceed 20 minutes [2]. Further, the power required during take-off and hover can be twice or thrice that needed for steady level flight, and thus the number and sequence of such events is also limited by the mass and size of the power source. For operations such as "perch and stare" or "silent watch" the power demand is often only a tenth of that required during continuous flight. Thus, variation in power demand during various phases of the mission importantly affects the power source selection.

  10. Ontario hydro radioactive material transportation field guide

    International Nuclear Information System (INIS)

    Howe, W.

    1987-01-01

    The recent introduction of both the AECB Transport Packaging of Radioactive Material Regulations and Transport Canada's Transportation of Dangerous Goods Regulations have significantly altered the requirements for transporting radioactive material in Canada. Extensive additional training as well as certification of several hundred Ontario Hydro employees has been necessary to ensure compliance with the additional and revised regulatory requirements. To assist in the training of personnel, an 'active' corporate Ontario Hydro Field Guide for Radioactive Material Transport document has been developed and published. The contents of this Field Guide identify current Ontario Hydro equipment and procedures as well as the updated relevant regulatory requirements within Canada. In addition, to satisfying Ontario Hydro requirements for this type of information over two thousand of these Field Guides have been provided to key emergency response personnel throughout the province of Ontario to assist in their transportation accident response training

  11. The HydroShare Collaborative Repository for the Hydrology Community

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of, and collaboration around, "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting our approach to making this system easy to use and serving the needs of the hydrology community represented by the Consortium of Universities for the Advancement of Hydrologic Sciences, Inc. (CUAHSI). Metadata for uploaded files is harvested automatically or captured using easy to use web user interfaces. Users are encouraged to add or create resources in HydroShare early in the data life cycle. To encourage this we allow users to share and collaborate on HydroShare resources privately among individual users or groups, entering metadata while doing the work. HydroShare also provides enhanced functionality for users through web apps that provide tools and computational capability for actions on resources. HydroShare's architecture broadly is comprised of: (1) resource storage, (2) resource exploration website, and (3) web apps for actions on resources. System components are loosely coupled and interact through APIs, which enhances robustness, as components can be upgraded and advanced relatively independently. The full power of this paradigm is the

  12. The Modeling and Simulation of Thermal Analysis at Hydro Generator Stator Winding Insulation

    Directory of Open Access Journals (Sweden)

    Mihaela Raduca

    2006-10-01

    Full Text Available This paper presents the modelling and simulation of thermal analysis at hydro generator stator winding. The winding stator is supplied at high voltage of 11 kV for high power hydro generator. To present the thermal analysis for stator winding is presented at supply of coil by 11 kV, when coil is heat and thermal transfer in insulation at ambient temperature.

  13. Secured electrical supply at least cost: Coal, gas, nuclear, hydro

    Energy Technology Data Exchange (ETDEWEB)

    Gavor, J. [ENA Ltd., Prague (Czechoslovakia); Stary, O.; Vasicek, J. [Czech Technical Univ., Prague (Czechoslovakia)

    1995-12-01

    Electric power sector in East Central European countries finds in a difficult period. In the situation of demand stagnation, enormous investments must be realized in a very short time. Today`s decisions in the development strategy will influence the long term future of the industry. The optimal structure of the sources is one of the most important problem to be solved. Paper describes the current structure of the sources in electric power sector in the Czech Republic. The importance of coal, oil and gas, nuclear and hydro in electric power generation is compared. Taking into account the different position in the load coverage, economy of individual sources is evaluated and basic results of discounted cash flow calculations are presented. Information on specific investment programs and projects are included and further trends are estimated.

  14. Hydro and After: The Canadian Experience with the Organization, Nationalization and Deregulation of Electrical Utilities

    International Nuclear Information System (INIS)

    Nelles, Henry Vivian

    2003-01-01

    This paper surveys the process of nationalization and some recent steps towards denationalization in a distinctive Canadian institutional setting, the provincial hydro-electric power utilities. The richest, most industrialized central province, Ontario, established a dynamic publicly owned electric generation and distribution system before World War I. Most other provinces developed variations of the regulatory model to govern private monopolies until the post World War II period when widespread nationalization at the provincial level created a near universal pattern of state owned electric companies. Recently, the process of dismantling state monopolies in this sector has begun in two provinces, one where public ownership was weakest, and the other where the concept of 'provincial hydro' was born

  15. Micro-hydrokinetic turbine potential for sustainable power generation in Malaysia

    Science.gov (United States)

    Salleh, M. B.; Kamaruddin, N. M.; Mohamed-Kassim, Z.

    2018-05-01

    Micro-hydrokinetic turbine (μ-HKT) technology is considered a viable option for sustainable, green and low cost power production. In recent years, there is growing number of research and development on this technology to replace conventional power production systems such as fossil fuel as well as to provide off-grid electrification to communities in remote areas. This paper provides an overview of μ-HKT system, the implementation of the technology and the potential of using μ-HKT in Malaysia. A review on the climate in Malaysia shows that its average annual rainfall is higher than the world’s average annual rainfall. It contributes to the total hydropower resource of about 29,000 MW which is available all year-round. Currently, hydropower resource contributes only 7.4% of the total electrical power production in Malaysia but is expected to increase with the main contribution coming from μ-HKT. However, the μ-HKT technology has not been adopted in Malaysia due to some challenges that hinder the development of the system. This paper reviews the μ-HKT technology and its potential for application in Malaysia, particularly in remote areas.

  16. BC Hydro's integrated resource planning : the 2004 IEP and beyond

    International Nuclear Information System (INIS)

    Soulsby, R.

    2004-01-01

    An outline of BC Hydro Integrated Electricity Plan (IEP) was presented in this paper, along with details of its environmental, social and business performance and statistics of its net income and revenue for 2003-2004. The IEP was created to match long term load to supply in the most cost-effective way and is also the basis for resource acquisition plans. In addition, the IEP models performance of portfolios of resources on a system-wide basis, considers uncertainties through sensitivity analysis and measures and evaluates multiple attributes from various portfolios. A flow chart of processes informed by the IEP was presented. Guiding principles behind the creation of the plan include low electricity rates and public ownership; secure, reliable supply; private sector development; environmental responsibility, with no nuclear power sources; ensuring energy self-sufficiency; and maintaining a balanced portfolio of resources. A pie chart of BC Hydro's current portfolio mix was presented as well as a supply and demand outlook and details of plans and new capacity resources required before 2013. Various resource options were presented. Key outcomes of First Nations and stakeholder engagement include the acceptance of BC Hydro as a sustainable energy company; a desire for higher priority on reliability and low cost; an agreement over the Power Smart 10 year plan; a general agreement that the current, balanced approach to resource acquisition was appropriate; and a desire for more rate options. There was an assurance that BC Hydro would continue to engage First Nations and stakeholders in integrated electricity planning. Other outcomes included requests for more information about outage and outage planning and process improvements; support to maintain low rates; a preference for maximizing use of existing facilities; support for wood waste cogeneration. A broad range of options were reviewed, but no superior portfolio was identified within the parameters of this paper

  17. An integrated computer design environment for the development of micro-computer critical software

    International Nuclear Information System (INIS)

    De Agostino, E.; Massari, V.

    1986-01-01

    The paper deals with the development of micro-computer software for Nuclear Safety System. More specifically, it describes an experimental work in the field of software development methodologies to be used for the implementation of micro-computer based safety systems. An investigation of technological improvements that are provided by state-of-the-art integrated packages for micro-based systems development has been carried out. The work has aimed to assess a suitable automated tools environment for the whole software life-cycle. The main safety functions, as DNBR, KW/FT, of a nuclear power reactor have been implemented in a host-target approach. A prototype test-bed microsystem has been implemented to run the safety functions in order to derive a concrete evaluation on the feasibility of critical software according to new technological trends of ''Software Factories''. (author)

  18. Optimal scheduling for distributed hybrid system with pumped hydro storage

    International Nuclear Information System (INIS)

    Kusakana, Kanzumba

    2016-01-01

    Highlights: • Pumped hydro storage is proposed for isolated hybrid PV–Wind–Diesel systems. • Optimal control is developed to dispatch power flow economically. • A case study is conducted using the model for an isolated load. • Effects of seasons on the system’s optimal scheduling are examined through simulation. - Abstract: Photovoltaic and wind power generations are currently seen as sustainable options of in rural electrification, particularly in standalone applications. However the variable character of solar and wind resources as well as the variable load demand prevent these generation systems from being totally reliable without suitable energy storage system. Several research works have been conducted on the use of photovoltaic and wind systems in rural electrification; however most of these works have not considered other ways of storing energy except for conventional battery storage systems. In this paper, an energy dispatch model that satisfies the load demand, taking into account the intermittent nature of the solar and wind energy sources and variations in demand, is presented for a hybrid system consisting of a photovoltaic unit, a wind unit, a pumped hydro storage system and a diesel generator. The main purpose of the developed model is to minimize the hybrid system’s operation cost while optimizing the system’s power flow considering the different component’s operational constraints. The simulations have been performed using “fmincon” implemented in Matlab. The model have been applied to two test examples; the simulation results are analyzed and compared to the case where the diesel generator is used alone to supply the given load demand. The results show that using the developed control model for the proposed hybrid system, fuel saving can be achieved compared to the case where the diesel is used alone to supply the same load patters.

  19. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Mariano, S.J.P.S. [Beira Interior Univ., Covilha (Portugal). Dept. of Electromechanical Engineering; Mendes, V.M.F. [Superior Engineering Inst. of Lisbon, Lisbon (Portugal). Dept. of Electrical Engineering and Automation; Ferreira, L.A.F.M. [Technical Univ. of Lisbon, Superior Technical Inst., Lisbon (Portugal). Dept. of Electrical Engineering and Computers

    2008-07-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs.

  20. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2008-01-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs

  1. Ontario Hydro's DSP update

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Ontario Hydro's Demand/Supply Plan (DSP), the 25 year plan which was submitted in December 1989, is currently being reviewed by the Environmental Assessment Board (EAB). Since 1989 there have been several changes which have led Ontario Hydro to update the original Demand/Supply Plan. This information sheet gives a quick overview of what has changed and how Ontario Hydro is adapting to that change

  2. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented... Hydro-WM, LLC. The project is located on the Rockfish River in Nelson County, Virginia. The transfer of...

  3. Calibration of thermoluminescence skin dosemeter response to beta emitters found in Ontario Hydro nuclear power stations

    International Nuclear Information System (INIS)

    Walsh, M.L.; Agnew, D.A.; Donnelly, K.E.

    1984-01-01

    The response of the Ontario Hydro Thermoluminescence Dosimetry System to beta radiation in nuclear power station environments was evaluated. Synthetic beta spectra were constructed, based on activity samples from heat transport systems and fuelling machine contamination smears at nuclear power stations. Using these spectra and dosemeter energy response functions, an overall response factor for the skin dosemeter relative to skin dose at 7 mg.cm -2 was calculated. This calculation was done assuming three specific geometries: (1) an infinite uniformly contaminated plane source at a distance of 33 cm (50 mg.cm -2 total shielding) from the receptor; (2) an infinite cloud surrounding the receptor; (3) a point source at 33 cm. Based on these calculations, a conservative response factor of 0.7 has been chosen. This provides an equation for skin dose assignment, i.e. Skin Dose = 1.4 x Skin Dosemeter Reading when the skin dosemeter is directly calibrated in mGy(gamma). (author)

  4. Experimental and numerical investigation of hydro power generator ventilation

    Science.gov (United States)

    Jamshidi, H.; Nilsson, H.; Chernoray, V.

    2014-03-01

    Improvements in ventilation and cooling offer means to run hydro power generators at higher power output and at varying operating conditions. The electromagnetic, frictional and windage losses generate heat. The heat is removed by an air flow that is driven by fans and/or the rotor itself. The air flow goes through ventilation channels in the stator, to limit the electrical insulation temperatures. The temperature should be kept limited and uniform in both time and space, avoiding thermal stresses and hot-spots. For that purpose it is important that the flow of cooling air is distributed uniformly, and that flow separation and recirculation are minimized. Improvements of the air flow properties also lead to an improvement of the overall efficiency of the machine. A significant part of the windage losses occurs at the entrance of the stator ventilation channels, where the air flow turns abruptly from tangential to radial. The present work focuses exclusively on the air flow inside a generator model, and in particular on the flow inside the stator channels. The generator model design of the present work is based on a real generator that was previously studied. The model is manufactured taking into consideration the needs of both the experimental and numerical methodologies. Computational Fluid Dynamics (CFD) results have been used in the process of designing the experimental setup. The rotor and stator are manufactured using rapid-prototyping and plexi-glass, yielding a high geometrical accuracy, and optical experimental access. A special inlet section is designed for accurate air flow rate and inlet velocity profile measurements. The experimental measurements include Particle Image Velocimetry (PIV) and total pressure measurements inside the generator. The CFD simulations are performed based on the OpenFOAM CFD toolbox, and the steady-state frozen rotor approach. Specific studies are performed, on the effect of adding "pick-up" to spacers, and the effects of the

  5. Multiple objective optimization of hydro-thermal systems using Ritz's method

    Directory of Open Access Journals (Sweden)

    Arnáu L. Bayón

    1999-01-01

    Full Text Available This paper examines the applicability of the Ritz method to multi-objective optimization of hydro-thermal systems. The algorithm proposed is aimed to minimize an objective functional that incorporates the cost of energy losses, the conventional fuel cost and the production of atmospheric emissions such as NO x and SO 2 caused by the operation of fossil-fueled thermal generation. The formulation includes a general layout of hydro-plants that may form multi-chains of reservoir network. Time-delays are included and the electric network is considered by using the active power balance equation. The volume of water discharge for each hydro-plant is a given constant amount from the optimization interval. The generic minimization algorithm, which is not difficult to construct on the basis of the Ritz method, has certain advantages in comparison with the conventional methods.

  6. Short-term hydro-thermal-wind complementary scheduling considering uncertainty of wind power using an enhanced multi-objective bee colony optimization algorithm

    International Nuclear Information System (INIS)

    Zhou, Jianzhong; Lu, Peng; Li, Yuanzheng; Wang, Chao; Yuan, Liu; Mo, Li

    2016-01-01

    Highlights: • HTWCS system is established while considering uncertainty of wind power. • An enhanced multi-objective bee colony optimization algorithm is proposed. • Some heuristic repairing strategies are designed to handle various constraints. • HTWCS problem with economic/environment objectives is solved by EMOBCO. - Abstract: This paper presents a short-term economic/environmental hydro-thermal-wind complementary scheduling (HTWCS) system considering uncertainty of wind power, as well as various complicated non-linear constraints. HTWCS system is formulated as a multi-objective optimization problem to optimize conflictive objectives, i.e., economic and environmental criteria. Then an enhanced multi-objective bee colony optimization algorithm (EMOBCO) is proposed to solve this problem, which adopts Elite archive set, adaptive mutation/selection mechanism and local searching strategy to improve global searching ability of standard bee colony optimization (BCO). Especially, a novel constraints-repairing strategy with compressing decision space and a violation-adjustment method are used to handle various hydraulic and electric constraints. Finally, a daily scheduling simulation case of hydro-thermal-wind system is conducted to verify feasibility and effectiveness of the proposed EMOBCO in solving HTWCS problem. The simulation results indicate that the proposed EMOBCO can provide lower economic cost and smaller pollutant emission than other method established recently while considering various complex constraints in HTWCS problem.

  7. Treatment of Displaced Indigenous Populations in Two Large Hydro Projects in Panama

    Directory of Open Access Journals (Sweden)

    Mary Finley-Brook

    2010-06-01

    Full Text Available Consultation practices with affected populations prior to hydro concessions often remained poor in the decade since the World Commission on Dams (WCD although, in some cases the involvement of local people in the details of resettlement has improved. Numerous international and national actors, such as state agencies, multilateral banks, corporate shareholders, and pro-business media, support the development of dams, but intergovernmental agencies struggle to assure the protection of fundamental civil, human, and indigenous rights at the permitting and construction stages. We analyse two large-scale Panamanian dams with persistent disrespect for indigenous land tenure. Free, prior, and informed consent was sidestepped even though each dam required or will require Ngöbe, Emberá, or Kuna villages to relocate. When populations protested, additional human rights violations occurred, including state-sponsored violence. International bodies are slowly identifying and denouncing this abuse of power. Simultaneously, many nongovernmental organisations (NGOs seek change in Panama consistent with WCD’s good-practice guidelines. A number of NGOs have tied hydro projects to unethical greenhouse gas (GHG emissions trade. As private and state institutions market formerly collective water and carbon resources for profit, these Panamanian cases have become central to a public debate over equitable and green hydro development. Media communication feeds disputes through frontline coverage of cooperation and confrontation.

  8. How can small hydro energy and other renewable energy mitigate impact of climate change in remote Central Africa: Cameroon case study.

    Science.gov (United States)

    Kenfack, Joseph; Bignom, Blaise

    2015-04-01

    Central Africa owns important renewable energy potential, namely hydro, solar and biomass. This important potential is still suffering from poor development up to the point where the sub region is still abundantly using the fossil energy and biomass as main power source. This is harmful to the climate and the situation is still ongoing. The main cause of the poor use of renewable energy is the poor management of resources by governments who have not taken the necessary measures to boost the renewable energy sector. Since the region is experiencing power shortage, thermal plants are among other solutions planned or under construction. Firewood is heavily used in remote areas without a sustainability program behind. This solution is not environment friendly and hence is not a long term solution. Given the fact that the region has the highest hydro potential of the continent, up to one-quarter of the world's tropical forest, important oil production with poor purchase power, the aim of this paper is to identify actions for improved access to sustainable, friendly, affordable energy services to users as well as a significant improvement of energy infrastructure in Central Africa and the promotion of small hydro and other renewable energy. The work will show at first the potential for the three primary energy sources which are solar, biomass and hydro while showing where available the level of development, with an emphasis on small hydro. Then identified obstacles for the promotion of clean energy will be targeted. From lessons learned, suggestions will be made to help the countries develop an approach aiming at developing good clean energy policy to increase the status of renewable energy and better contribute to fight against climate change. Cameroon has a great renewable energy potential and some data are available on energy. From the overview of institutional structure reform of the Cameroon power sector and assessments, specific suggestions based on the weaknesses

  9. Small hydro in Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2011-10-01

    Full Text Available hydro, the author has started an online database of small hydropower projects in eastern and southern Africa. The main aim of the database is to catalogue the current situation and to make that accessible to policymakers, project developers, as well...

  10. Ontario Hydro at the millennium : has monopoly's moment passed?

    International Nuclear Information System (INIS)

    Daniels, R.J.

    1996-01-01

    This volume is a collection of 10 papers presented at a conference in which the challenges of restructuring the electric power industry in Ontario were discussed. Legal experts, policy makers, economists and stakeholders in the industry presented their views regarding the future of the industry in Ontario. The implications of privatization were discussed. There was general agreement on the need for some industry de-integration and privatization. However, agreement on the exact nature of the approach to take was more divided. For example, opinion was divided on what the logical endpoint of industry restructuring should be i.e. wholesale or retail competition. Also contentious was the question of what portion of Hydro's generating assets should be sold off to private enterprise if Hydro's generation and transmission assets are unbundled. Opinions were also divided about the environmental consequences of nuclear energy. Significant differences of opinion were evident concerning the privatization of Ontario Hydro's nuclear assets. refs., tabs., figs

  11. A Review of Distributed Control Techniques for Power Quality Improvement in Micro-grids

    Science.gov (United States)

    Zeeshan, Hafiz Muhammad Ali; Nisar, Fatima; Hassan, Ahmad

    2017-05-01

    Micro-grid is typically visualized as a small scale local power supply network dependent on distributed energy resources (DERs) that can operate simultaneously with grid as well as in standalone manner. The distributed generator of a micro-grid system is usually a converter-inverter type topology acting as a non-linear load, and injecting harmonics into the distribution feeder. Hence, the negative effects on power quality by the usage of distributed generation sources and components are clearly witnessed. In this paper, a review of distributed control approaches for power quality improvement is presented which encompasses harmonic compensation, loss mitigation and optimum power sharing in multi-source-load distributed power network. The decentralized subsystems for harmonic compensation and active-reactive power sharing accuracy have been analysed in detail. Results have been validated to be consistent with IEEE standards.

  12. Wind Power Development and Energy Storage under China’s Electricity Market Reform—A Case Study of Fujian Province

    Directory of Open Access Journals (Sweden)

    Dunguo Mou

    2018-01-01

    Full Text Available This paper, based on the Fujian provincial 500 kV grid and part of the 220 kV grid and the key power plants, including hydro, coal, nuclear, gas, wind and pumping and storage hydro powers (PSHP connected to the grid, constructs an independent electricity market model. Using data that are very close to reality about coal fired power production costs, along with data about power plants’ technical constraints, this paper studies the effect of wind power on Fujian’s provincial electricity market. Firstly, the paper analyzes the relationship between wind speed and wind power output and the effects of short-term power output fluctuation on frequency modulation and voltage regulation. Secondly, under supposition of the production costs following quadratic functions, the paper analyzes the effects of changes in wind power output on the electricity supply costs under optimal power flow. Thirdly, using the bidding model in the Australian Electricity Market Operator for reference and supposing that, in a competitive market, coal fired power plants can bid 6 price bands according to their capacity, the paper analyzes effects of wind power on electricity prices under optimal power flow, the stabilizing effects of PSHP and the minimum PSHP capacity needed to stabilize the electricity market. Finally, using a daily load curve, this paper simulates the electricity prices’ fluctuation under optimal power flow and PSHP’s stabilizing effect. The results show that, although PSHP has a large external social welfare effect, it can hardly make a profit. In the end, this paper puts forward some policy suggestions for Fujian province’s wind and nuclear power development, PSHP construction and electricity market development.

  13. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Miksova water power station. The Miksova water power station is part of the second derived cascade of hydro power stations on the river Vah. It was built at the end of a huge development in Slovak hydro-energy in the late 1950's and the beginning of the 1960's. It is the second water power station on this derived cascade, which is situated downstream the Hricov reservoir and water power station. At the power station, three turbine sets with vertical Kaplan turbines are installed with a total power output of 3 x 31.2 = 93.6 MW. With this power output the Miksova water power station (Miksova I) was the biggest water power station in the Slovak Republic until the construction of Pumping water power station Liptovska Mara. And it is still the biggest channel water power station on the Vah so far. It was put into operation during the period 1963 to 1965. There are three turbine sets with Kaplan turbines from CKD Blansko, with a synchronous hydro-alternator installed in the power station. Their installed capacity is 93.6 MW in total and the projected annual production of electrical energy is 207 GWh. The turbines are fi ve-bladed (on the Hricov and Povazska Bystrica water power stations they are four-bladed) and the impeller wheel has a diameter of 4800 mm. They are designed for extension of the head from 24.1 to 22.21 m and each of them has an absorption capacity of 134 m 3 .s -1 nd a nominal operating speed of 2.08 m 3 .s -1 , runaway speed 4.9 m 3 .s -1 . Each synchronous hydro-alternator has a maximum power output of 31.2 MW, a nominal voltage of 10.5 kV and power factor cos φ of 0.8. Power from the power station is led out through 110 kV switchgear. The water power station operates under automatic turbine mode of operation with remote indication and control from the Dispatch Centre at Vodne elektrarne, in Trencin. From start of operation until the end of 2003 all three turbine sets operated for a total of 450,500 running hours and the

  14. Hydro makes the most of driftwood

    Energy Technology Data Exchange (ETDEWEB)

    Shinjo, Takahisa [Electric Power Development Company, Tokyo (Japan)

    2001-05-01

    The Electric Power Development Company (EPDC), which owns and operates 58 hydro power plants and controls 40 reservoirs, is reaping benefits from the driftwood collected from the reservoirs. Large amounts of driftwood, litter and illegally dumped wastes are removed from the company's reservoirs every year. The driftwood was previously incinerated but a new processing system is now used which is more cost-effective and has less impact on the environment. EPDC has installed carbonisation kilns and chipping systems at a number of its sites. The end-products (charcoal, wood vinegar and chips) are sold to offset the costs of driftwood processing. The properties of driftwood charcoal make it suitable for a number of applications (eg absorption, deodorisation, soil improvement and humidity control), while pulverised charcoal is sold as a fuel, as a deodorant for drinking water and for humidity control sheets. The wood vinegar has been used as a preservative, in insecticides and to promote plant growth. Refining the wood vinegar has allowed EPDC to develop cosmetics and face creams. Chips are sold to a plywood manufacturer or used as an organic fertiliser.

  15. Ontario Hydro Research Division, 1980

    International Nuclear Information System (INIS)

    The work of the Research Division of Ontario Hydro provides technical and scientific support for the engineering and operation of a power system that includes hydraulic, fossil-fired, and nuclear generation. It also relates to the transmission and distribution of electricity and to the need to help customers use electricity with safety and economy. Among the examples of projects given are qualification of CANDU heat transport system components, pressure tube replacement, steam generator integrity, testing for earthquake resistance, and radioactive waste disposal

  16. Development of finite element code for the analysis of coupled thermo-hydro-mechanical behaviors of saturated-unsaturated medium

    International Nuclear Information System (INIS)

    Ohnishi, Y.; Shibata, H.; Kobayashi, A.

    1985-01-01

    A model is presented which describes fully coupled thermo-hydro-mechanical behavior of porous geologic medium. The mathematical formulation for the model utilizes the Biot theory for the consolidation and the energy balance equation. The medium is in the condition of saturated-unsaturated flow, then the free surfaces are taken into consideration in the model. The model, incorporated in a finite element numerical procedure, was implemented in a two-dimensional computer code. The code was developed under the assumptions that the medium is poro-elastic and in plane strain condition; water in the ground does not change its phase; heat is transferred by conductive and convective flow. Analytical solutions pertaining to consolidation theory for soils and rocks, thermoelasticity for solids and hydrothermal convection theory provided verification of stress and fluid flow couplings, respectively in the coupled model. Several types of problems are analyzed. The one is a study of some of the effects of completely coupled thermo-hydro-mechanical behavior on the response of a saturated-unsaturated porous rock containing a buried heat source. Excavation of an underground opening which has radioactive wastes at elevated temperatures is modeled and analyzed. The results shows that the coupling phenomena can be estimated at some degree by the numerical procedure. The computer code has a powerful ability to analyze of the repository the complex nature of the repository

  17. Resettlement associated with hydro projects in China

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The flow rates of Chinese rivers are subject to major seasonal fluctuations, and as a result large reservoirs have to be constructed for flood control, irrigation, and power generation. As most of the river valleys are densely populated, the relocation and resettlement of people from the reservoir areas are major but unavoidable problems to be addressed in building hydro projects in China. (author)

  18. Study of the use of a micro hydro in knockdown container completed with a cylindrical form housing of francis hydraulic turbine to support the development program of energy self-sustainability for remote and isolated areas in Indonesia

    Science.gov (United States)

    Kamal, Samsul; Prajitno; Pardadi, Janu

    2017-11-01

    With an intention to reduce the consumption of energy from fossil fuels and the CO2 emission in relation with the climate change solution, Indonesian Government has targeted that the role of the New and Renewable Energy (NRE) resources reaches at least 23% , or about 27 GW , in 2025 and it is expected to increase to the extent of about 134 GW in 2050 within the scenario of mixed energy supply. Geographically Indonesia has many remote and isolated areas with lack of appropriate infrastructure supports. But in the most of the areas, huge potential of new and renewable energy are available such as hydro energy is about 75 GW, biomass energy is about 32 GW and bio fuel is about 32 GW. The total utilization of the energy from small hydro energy up to this year for example is only about 300 MW. The significant obstacle in optimizing the utilization of small hydro energy in the areas is mainly on the infrastructure conditions and the local manufacture capabilities. Difficulties in mobilization of experts, skill worker , parts and constructions material result in very time consuming and costly for site construction. In this research a hydro turbine built in knock down container completed with a Francis turbine in cylindrical form housing is proposed and reported its performance on implementation. The hydro in a knock down container concept comes from the idea to manufacture hydro power solutions in a knock down container, readymade to be transported to installation sites. It can be easily manufactured in a quality controlled and cost effective environment, transported and installed in remote areas, to operate and maintain with minimal amount of equipment. It shows that the implementation of the unit in a remote area has reduced the total site construction time by 1/3 compared to the predicted one with conventional unit. The performance of the Francis turbine with cylindrical form housing has shown comparable with the conventional one which has volute form housing. The

  19. Nuclear power - Sustainable development - Professional skill

    International Nuclear Information System (INIS)

    Comsa, Olivia; Paraschiva, M.V.; Banutoiu, Maria

    2002-01-01

    Sustainable development of society implies taking political decisions integrating harmoniously ingredients like these: - technological maturity; - socio-economic efficiency; - rational and equitable use of natural resources; - compliance with requirements concerning the environment and population; - professional ethics; - communications with the public and media; - professional skill; - public opinion acceptance. A rational analysis of these factors shows clearly that nuclear power appears to be an optimal ground for a sustainable power source besides the hydro and thermo-electric systems. Such a conclusion was confirmed by all types of analyses, methodologies or programs like for instance: MAED, WASP, FINPLAN, DECADES, ENPEP and more recently MESSAGE. The paper describes applications of these analytical methodologies for two scenarios of Cernavoda NPP future development. To find the optimal development strategy for the electric system, implying minimal costs the optimization analysis mode of the ELECSAM analysis module was used. The following conclusions were reached: - the majority of Romania's classical electrical stations are old; consequently, part of them should be decommissioned while others will be refurbished. Instead of installing new power groups these options will result in lowering the investment cost, as well as, in reduction of noxious gas emission; - the nuclear power system developed in Romania upon the CANDU technology appears to be one of the most performing and safe technology in the world. Cernavoda NPP Unit 1 commissioned on December 2, 1996 covers about 10% to 12% of the energy demand of the country. The CANDU systems offers simultaneously secure energy supply, safe operation, low energy costs and practically a zero impact upon the environment. The case study for Romania by means of DECADES project showed that the development program with minimal cost for electrical stations implies construction of new 706.5 MW nuclear units and new 660 MW

  20. Research, Development and Demonstration of Micro-CHP System for Residential Applications

    Energy Technology Data Exchange (ETDEWEB)

    Karl Mayer

    2010-03-31

    ECR International and its joint venture company, Climate Energy, are at the forefront of the effort to deliver residential-scale combined heat and power (Micro-CHP) products to the USA market. Part of this substantial program is focused on the development of a new class of steam expanders that offers the potential for significantly lower costs for small-scale power generation technology. The heart of this technology is the scroll expander, a machine that has revolutionized the HVAC refrigerant compressor industry in the last 15 years. The liquid injected cogeneration (LIC) technology is at the core of the efforts described in this report, and remains an excellent option for low cost Micro-CHP systems. ECR has demonstrated in several prototype appliances that the concept for LIC can be made into a practical product. The continuing challenge is to identify economical scroll machine designs that will meet the performance and endurance requirements needed for a long life appliance application. This report describes the numerous advances made in this endeavor by ECR International. Several important advances are described in this report. Section 4 describes a marketing and economics study that integrates the technical performance of the LIC system with real-world climatic data and economic analysis to assess the practical impact that different factors have on the economic application of Micro-CHP in residential applications. Advances in the development of a working scroll steam expander are discussed in Section 5. A rigorous analytical assessment of the performance of scroll expanders, including the difficult to characterize impact of pocket to pocket flank leakage, is presented in Section 5.1. This is followed with an FEA study of the thermal and pressure induced deflections that would result from the normal operation of an advanced scroll expander. Section 6 describes the different scroll expanders and test fixtures developed during this effort. Another key technical