WorldWideScience

Sample records for mexico-texas water commission

  1. Hydrogeochemical and stream sdeiment reconnaissance basic data for Brownfield Quadrangle, New Mexico; Texas

    International Nuclear Information System (INIS)

    1981-01-01

    Field and laboratory data are presented for 452 water samples and 351 sediment samples from the Brownfield Quadrangle, New Mexico; Texas. Uranium values have been reported by Los Alamos National Laboratory in Report GJBX-103(78). The samples were collected by Los Alamos National Laboratory; laboratory analysis and data reporting were performed by the Uranium Resource Evaluation Project at Oak Ridge, Tennessee

  2. Geochemical and isotopic determination of deep groundwater contributions and salinity to the shallow groundwater and surface water systems, Mesilla Basin, New Mexico, Texas, and Mexico

    Science.gov (United States)

    Robertson, A.; Carroll, K. C.; Kubicki, C.; Purtshert, R.

    2017-12-01

    The Mesilla Basin/Conejos-Médanos aquifer system, extending from southern New Mexico to Chihuahua, Mexico, is a priority transboundary aquifer under the 2006 United States­-Mexico Transboundary Aquifer Assessment Act. Declining water levels, deteriorating water quality, and increasing groundwater use by municipal, industrial, and agricultural users on both sides of the international border raise concerns about long-term aquifer sustainability. Relative contributions of present-day and "paleo" recharge to sustainable fresh groundwater yields has not been determined and evidence suggests that a large source of salinity at the distal end of the Mesilla Basin is saline discharge from deep groundwater flow. The magnitude and distribution of those deep saline flow paths are not determined. The contribution of deep groundwater to discharge and salinity in the shallow groundwater and surface water of the Mesilla Basin will be determined by collecting discrete groundwater samples and analyzing for aqueous geochemical and isotopic tracers, as well as the radioisotopes of argon and krypton. Analytes include major ions, trace elements, the stable isotopes of water, strontium and boron isotopes, uranium isotopes, the carbon isotopes of dissolved inorganic carbon, noble gas concentrations and helium isotope ratios. Dissolved gases are extracted and captured from groundwater wells using membrane contactors in a process known as ultra-trace sampling. Gas samples are analyzed for radioisotope ratios of krypton by the ATTA method and argon by low-level counting. Effectiveness of the ultra-trace sampling device and method was evaluated by comparing results of tritium concentrations to the krypton-85 content. Good agreement between the analyses, especially in samples with undetectable tritium, indicates that the ultra-trace procedure is effective and confirms that introduction of atmospheric air has not occurred. The geochemistry data indicate a complex system of geochemical

  3. Startup and commissioning of pressurized water reactors

    International Nuclear Information System (INIS)

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  4. Reactor Safety Commission Code of Practice for Pressurized Water Reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The Reactor Safety Commission of the Federal German Republic has summarized in the form of Official Guidelines the safety requirements which, in the Commission's view, have to be met in the design, construction and operation of a nuclear power station equipped with a pressurized water reactor. The Third Edition of the RSK Guidelines for pressurized water reactors dated 14.10.81. is a revised and expanded version of the Second Edition dated 24.1.79. The Reactor Safety Commission will with effect from October 1981 use these Guidelines in consultations on the siting of and safety concept for the installation approval of future pressurized water reactors and will assess these nuclear power stations during their erection in the light of these Guidelines. They have not however been immediately conceived for the adaptation of existing nuclear power stations, whether under construction or in operation. The scope of application of these Guidelines to such nuclear power stations will have to be examined for each individual case. The main aim of the Guidelines is to simplify the consultation process within the reactor Safety Commission and to provide early advice on the safety requirements considered necessary by the Commission. (author)

  5. Commissioning and cross-comparison of four scanning water tanks

    Directory of Open Access Journals (Sweden)

    Daniel Saenz

    2016-03-01

    Full Text Available Purpose: Water scanning systems are commonly used for data collection to characterize dosimetric properties of photon and electron beams, and the commissioning of such systems has been previously described. The aim in this study, however, was to investigate tank-specific dependencies as well as conduct a dosimetric comparison between four distinct water scanning systems.Methods: Four water scanning systems were studied including the PTW MP3-M Phantom Tank, the Standard Imaging DoseView 3D, the IBA Blue Phantom, and the Sun Nuclear 3D Scanner. Mechanical accuracy and reproducibility was investigated by driving the chamber holder to nominal positions relative to a zero point and using a leveled caliper with 30 cm range to measure the actual position. Dosimetric measurements were also performed not only to compare percent-depth-dose (PDD curves and profiles between tanks but also to assess dependencies such as directionality, scanning speed, and reproducibility for each tank individually. A PTW Semiflex 31010 ionization chamber with a sensitive volume of 0.125 cc was used at a Varian Clinac 2300 linear accelerator.Results: Mechanical precision was ensured to within 0.1 mm with the standard deviation (SD of reproducibility <0.1 mm for measurements made with calipers. Dependencies on scanning direction and speed are presented. 6 MV PDDs between tanks agreed to within 0.6% relative to an averaged PDD beyond dmax and within 2.5% in the build-up region. Specifically, the maximum difference was 1.0% between MP3-M and Blue Phantom at 6.1 cm depth. Lateral profiles agreed between tanks within 0.5% in the central 80% of the field. 6 MeV PDD maximum difference was 1.3% occurring at the steepest portion, where the R50 was nevertheless within 0.6 mm across tanks. Setup uncertainties estimated at ≤1 mm are presumed to have contributed some of the difference between water tank data.Conclusion: Modern water scanning systems have achieved high accuracy across

  6. Commissioning performance activities of Heavy Water Plant (Hazira) (Paper No. 1.4)

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Heavy Water Plant, Hazira is the fourth in the line of plants based on monothermal NH 3 -H 2 exchange process. The experience gained during operation of other heavy water plants is reflected in the construction, commissioning and operation of HWP, Hazira. This paper aims at outlining the strategy adopted for both commissioning and operation. (author)

  7. 78 FR 46365 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-07-31

    ..., Colorado, New Mexico, Texas, Utah, and Wyoming: Contracts for extraordinary maintenance and replacement... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... individual contract actions may be published in the Federal Register and in newspapers of general circulation...

  8. 3 CFR - Designation of Officers of the United States Section, International Boundary and Water Commission...

    Science.gov (United States)

    2010-01-01

    ... 3 The President 1 2010-01-01 2010-01-01 false Designation of Officers of the United States Section, International Boundary and Water Commission, United States and Mexico To Act as the Commissioner of the United... States and Mexico To Act as the Commissioner of the United States Section Memorandum for the Commissioner...

  9. National symposium on commissioning and operating experiences in heavy water plants and associated chemical industries [Preprint volume

    International Nuclear Information System (INIS)

    1992-02-01

    A symposium on commissioning and operating experiences in heavy water plants and associated chemical industries (SCOPEX-92) was organised to share the experience and exchange the ideas among plant operators, designers, consultants and vendors in the areas of operation, commissioning and equipment performance. This pre-print volume has been brought out as an integrated source of information on commissioning and operation of heavy water plants. The following aspects of heavy water plants are covered: commissioning and operation, instrumentation and control, and safety and environment. (V.R.)

  10. Construction and commissioning experience of evolutionary water cooled nuclear power plants

    International Nuclear Information System (INIS)

    2004-04-01

    Electricity market liberalization is an established fact in several countries and there is a trend to adopt it in other countries. The essential aim of market liberalization is to improve the overall economic efficiency. In order that nuclear power remains a viable option for electricity generation, its costs should be competitive with alternative sources while, at the same time, it should have a safe and reliable operation record. The capital cost of nuclear power plants (NPPs) generally accounts for 43-70% of the total nuclear electricity generation costs, compared to 26-48% for coal plants and 13-32% for gas plants. Most of these expenditures are incurred during the construction phase of a NPP. The achievement of shorter construction periods using improved technology and construction methods has a significant benefit on the costs incurred prior to any production of electricity. This document is intended to make the recent worldwide experience on construction and commissioning of evolutionary water cooled NPPs available to Member States and especially to those with nuclear power plants under construction/planning, and to those seriously considering nuclear power projects in the future. The final aim is to assist utilities and other organizations in Member States to improve the construction of nuclear power plants and achieve shortened schedules and reduced costs without compromising quality and safety. This document aims to provide an overview of the most advanced technologies, methods and processes used in construction and commissioning of recent nuclear projects. To better achieve this objective the presentation is selectively focused more on the new developments rather than providing a full review of all issues related to construction and commissioning. The experience described in this TECDOC applies to managers, engineers, supervisors, technicians and workers in various organizations dealing with the site construction and commissioning of nuclear power plants

  11. SU-E-T-118: Analysis of Variability and Stability Between Two Water Tank Phantoms Utilizing Water Tank Commissioning Procedures

    International Nuclear Information System (INIS)

    Roring, J; Saenz, D; Cruz, W; Papanikolaou, N; Stathakis, S

    2015-01-01

    Purpose: The commissioning criteria of water tank phantoms are essential for proper accuracy and reproducibility in a clinical setting. This study outlines the results of mechanical and dosimetric testing between PTW MP3-M water tank system and the Standard Imaging Doseview 3D water tank system. Methods: Measurements were taken of each axis of movement on the tank using 30 cm calipers at 1, 5, 10, 50, 100, and 200 mm for accuracy and reproducibility of tank movement. Dosimetric quantities such as percent depth dose and dose profiles were compared between tanks using a 6 MV beam from a Varian 23EX LINAC. Properties such as scanning speed effects, central axis depth dose agreement with static measurements, reproducibility of measurements, symmetry and flatness, and scan time between tanks were also investigated. Results: Results showed high geometric accuracy within 0.2 mm. Central axis PDD and in-field profiles agreed within 0.75% between the tanks. These outcomes test many possible discrepancies in dose measurements across the two tanks and form a basis for comparison on a broader range of tanks in the future. Conclusion: Both 3D water scanning phantoms possess a high degree of spatial accuracy, allowing for equivalence in measurements regardless of the phantom used. A commissioning procedure when changing water tanks or upon receipt of a new tank is nevertheless critical to ensure consistent operation before and after the arrival of new hardware

  12. Technical support to the Nuclear Regulatory Commission for the boiling water reactor blowdown heat transfer program

    International Nuclear Information System (INIS)

    Rice, R.E.

    1976-09-01

    Results are presented of studies conducted by Aerojet Nuclear Company (ANC) in FY 1975 to support the Nuclear Regulatory Commission (NRC) on the boiling water reactor blowdown heat transfer (BWR-BDHT) program. The support provided by ANC is that of an independent assessor of the program to ensure that the data obtained are adequate for verification of analytical models used for predicting reactor response to a postulated loss-of-coolant accident. The support included reviews of program plans, objectives, measurements, and actual data. Additional activity included analysis of experimental system performance and evaluation of the RELAP4 computer code as applied to the experiments

  13. The projects for heavy water production of the Argentine National Atomic Energy Commission

    International Nuclear Information System (INIS)

    Garcia Bourg, J.M.; Garcia, E.E.

    1982-01-01

    The bases and scope of the projects for heavy water production that are being currently developed by the Argentine National Atomic Energy Commission (CNEA) are described. As an introduction, the following points are presented: a) the fundamentals of heavy water utilization in a nuclear reactor, with a mention of its properties and uses, b) a review of the physicochemical bases of the principal methods for heavy water production: chemical exchange (monothermal and bithermal processes), distillation and electrolysis, with tables summarizing the fundamental characteristics of the first two ones, and an evaluation of the different production methods from the viewpoint of their application in an industrial scale; and c) a synthetic information, in the form of tables, about the world's heavy water production. The subject of heavy water production in Argentina is treated in the principal section, describing the scope, location, main characteristics and chemical processes corresponding to the projects being developed by CNEA, which currently are the installation of an Industrial Plant in Arroyito (Province of Neuquen), purchased on a turnkey basis and using the NH 3 /H 2 isotopic exchange method; the installation of an Experimental Plant in Atucha (Province of Buenos Aires), for the development of the domestic technology of heavy-water production by the SH 2 /H 2 O isotopic exchange method, and the development of the engineering of an industrial plant (''Module 80''), based on the Experimental Plant's technology. (M.E.L.) [es

  14. Validation of the surge model and lessons learnt from commissioning of the Shuweihat water transmission scheme, UAE

    NARCIS (Netherlands)

    Leruth, P.; Pothof, I.W.M.; Naja, F.

    2012-01-01

    This paper presents a validation of the surge modeling results as well as lessons learnt from the commissioning test of the Shuweihat Water Transmission Scheme in the UAE. The Scheme is divided in two systems, The first system (Lot A) transmits water from Shuweihat to Mirfa (100 km). The second (Lot

  15. Commissioning of Water Detritiation and Cryogenic Distillation Systems at TLK in View of ITER Design

    International Nuclear Information System (INIS)

    Cristescu, I.; Doerr, L.; Glugla, M.; Hellriegel, G.; Schaefer, P.; Welte, St.; Wurster, W.; Murdoch, D.

    2006-01-01

    The Water Detritiation System (WDS) of ITER is one of the key systems to control the tritium content in the effluents streams, to recover as much tritium as possible and consequently to minimize the impact on the environment. In order to mitigate the concern over tritium release into the environment during pulsed operation of the Torus, the WDS and Isotope Separation System (ISS) will operate in such way that WDS will be a final barrier for the processed protium waste gas stream discharged from ISS. The ITER ISS consists of a cascade of four cryogenic distillation columns with the aim to process mainly two gas streams, one from Torus exhaust and other from WDS mixed with the returned stream from Neutral Beam Injectors (NBI). The behavior of the CD cascade has to be characterized with high accuracy with respect to thermal and isotopic fluctuations during Torus pulses. To support the research activities needed to characterize the performances of various components for WDS and ISS processes in various working conditions and configurations as needed for ITER design, an experimental facility called TRENTA based on the combination Combined Electrolysis Catalytic Exchange (CECE) - Cryogenic Distillation (CD), representative of the ITER WDS and ISS protium separation column, is under full commissioning at TLK. The CECE process consists of a solid polymer electrolyser unit as envisaged to be used in ITER WDS, and an 8 m Liquid Phase Catalytic Exchange Column (LPCE). The Electrolysis unit was commissioned with tritiated water and the enrichment factor was measured. The experimental program on the Cryogenic distillation facility at TLK is conducted to provide the necessary design and operation information for ITER ISS. It is focused on two major issues: - To investigate the separation performances and liquid hold up of different packings in cryogenic distillation process and to validate the steady-state mathematical modeling of the process. - To investigate the CD process

  16. The use of process simulation models in virtual commissioning of process automation software in drinking water treatment plants

    NARCIS (Netherlands)

    Worm, G.I.M.; Kelderman, J.P.; Lapikas, T.; Van der Helm, A.W.C.; Van Schagen, K.M.; Rietveld, L.C.

    2012-01-01

    This research deals with the contribution of process simulation models to the factory acceptance test (FAT) of process automation (PA) software of drinking water treatment plants. Two test teams tested the same piece of modified PA-software. One team used an advanced virtual commissioning (AVC)

  17. GenHyPEM: A research program on PEM water electrolysis supported by the European Commission

    Energy Technology Data Exchange (ETDEWEB)

    Millet, Pierre; Dragoe, Diana [Institut de Chimie Moleculaire et des Materiaux d' Orsay, UMR CNRS no 8182, Universite Paris-Sud 11, 15 rue Georges Clemenceau, 91405 Orsay Cedex (France); Grigoriev, Serguey; Fateev, Vladimir [Hydrogen Energy and Plasma Technology, Institute of Russian Research Center, Kurchatov Institute, 1, Kurchatov sq., 123182 Moscow (Russian Federation); Etievant, Claude [Compagnie Europeenne des Technologies de l' Hydrogene (CETH), Innov' Valley Entreprise, Batiment D0, Route de Nozay, 91461 Marcoussis Cedex (France)

    2009-06-15

    GenHyPEM (Generateur d'Hydrogene par electrolyse de l'eau PEM <>) is an STREP programme (no 019802) supported by the European Commission in the course of the 6th framework research programme. This R and D project which started in October 2005, is a 2.6 MEUR research effort over three years. It gathers partners from Belgium, Germany, Romania, Federation of Russia, Armenia and France. The main goal of the project is to develop low-cost and high pressure (50 bar) PEM water electrolysers for the production of up to several Nm{sup 3} H{sub 2}/h. The purpose of this communication is to present the current status of GenHyPEM. Major results and technological achievements obtained so far in the fields of academic (electrocatalysis, polymer electrolyte) and applied (stack development and performances) research are presented. Non-noble electrocatalysts have been identified to replace platinum for the HER and stable performances have been obtained during operation at high (1 A cm{sup -2}) current density, paving the way to substantial cost reductions. Prototype electrolysers producing from 0.1 to 5 Nm{sup 3} H{sub 2}/h have been successfully developed. (author)

  18. Valve combination permits more cost-efficient commissioning of drinking-water pipelines; Armaturenkombination ermoeglicht wirtschaftlichere Inbetriebnahme von Trinkwasserleitungen

    Energy Technology Data Exchange (ETDEWEB)

    Stock, W. [Schmieding Armaturen GmbH, Heusenstamm (Germany); Geske, M. [Stadtwerke Memmingen (Germany)

    2005-03-01

    The classical, and probably most widely-used, method of cleaning a newly installed water pipeline is that of flushing using drinking water. The target taken for the development of the valve combination designated 'R2D-Stueck' was therefore that of significantly increasing flushing performance and, therefore, cleaning efficiency. In addition, all operations associated with the commissioning of a drinking-water pipeline were to be made possible using one single component (in particular, cleaning, disinfection and pressure-testing, resulting in the abbreviation R2D [from German 'Reinigung, Desinfizieren, Druckprobe']). Reconnection and conversion work between the individual operations have been simplified or, in some cases, can even be omitted. Investment in an R2D-Stueck can thus be amortized after as few as five deployments, depending on DN. (orig.)

  19. Corrosion inhibition measures in primary cooling water system during refurbishment of Cirus, re-commissioning and subsequent operation

    International Nuclear Information System (INIS)

    Rai, K.K.; Ramesh, N.; Sharma, R.C.

    2008-01-01

    Cirus is a 40 MWth, heavy water moderated, demineralized light water cooled, natural uranium fuelled research reactor. Reactor was commissioned in year 1960 and operated satisfactorily till 1990. After that availability factor started decreasing mainly due to equipment outage exhibiting signs of ageing. Based upon systematic ageing studies and assessment of condition of systems, structures and components, a refurbishment plan including safety upgrades was drawn up. Reactor was shut down in October 1997 for execution of jobs. After completion of refurbishment jobs reactor was started back in October 2002 and power operation was achieved in 2003. Primary cooling water (PCW) system consists of re-circulating pumps, heat exchangers, expansion tank, piping, valves, emergency storage reservoir (Ball Tank) and other components. Normally the fission heat from fuel is removed by re-circulating coolant in closed loop and transferred to seawater via heat exchangers. In case of outage of pumps, shut down cooling is provided by flow of water from Ball Tank under gravity to the underground dump tanks. The dissolved oxygen is maintained below 2 ppm and pH is maintained neutral to minimize corrosion of fuel cladding (Aluminum). This paper highlights the experience gained during segmentation of primary cooling water pipelines for pressure testing, measures taken to corrosion inhibition of primary cooling water lines to permit execution of refurbishment jobs, inspections and actions taken to repair/replace the corroded PCW pipe line segments, observations regarding corrosion related failures, re-commissioning of the system after refurbishment, assessment for safe reactor operation and experience during power operation. (author)

  20. Ground-water protection activities of the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    1987-02-01

    This report evaluates the internal consistency of NRC's ground-water protection programs. These programs have evolved consistently with growing public concerns about the significance of ground-water contamination and environmental impacts. Early NRC programs provided for protection of the public health and safety by minimizing releases of radionuclides. More recent programs have included provisions for minimizing releases of nonradiological constituents, mitigating environmental impacts, and correcting ground-water contamination. NRC's ground-water protection programs are categorized according to program areas, including nuclear materials and waste management (NMSS), nuclear reactor operation (NRR), confirmatory research and standards development (RES), inspection and enforcement (IE), and agreement state programs (SP). Based on analysis of existing ground-water protection programs within NRC, the interoffice Ground-water Protection Group has identified several inconsistencies between and within program areas. These inconsistencies include: (1) different definitions of the term ''ground-water,'' (2) variable regulation of nonradiological constituents in ground water, (3) different design periods for ground-water protection, and (4) different scopes and rigor of ground-water assessments. The second inconsistency stems from differences in statutory authority granted to the NRC. The third inconsistency is rationalized by recognizing differences in perceived risks associated with nuclear facilities. The Ground-water Protection Group will document its analysis of the remaining inconsistencies and make recommendations to reconcile or eliminate them in a subsequent report

  1. Proceedings of the US Nuclear Regulatory Commission nineteenth water reactor safety information meeting

    International Nuclear Information System (INIS)

    Weiss, A.J.

    1992-04-01

    This three-volume report contains 83 papers out of the 108 that were presented at the Nineteenth Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, during the week of October 28--30, 1991. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included 14 different papers presented by researchers from Canada, Germany, France, Japan, Sweden, Taiwan, and USSR. This document, Volume 3, presents papers on: Structural engineering; Advanced reactor research; Advanced passive reactors; Human factors research; Human factors issues related to advanced passive light water researchers; Thermal Hydraulics; and Earth sciences. The individual papers have been cataloged separately

  2. Proceedings of the US Nuclear Regulatory Commission twentieth water reactor safety information meeting

    International Nuclear Information System (INIS)

    Weiss, A.J.

    1993-03-01

    This three-volume report contains papers presented at the Twentieth Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, during the week of October 21--23, 1992. The papers describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included 10 different papers presented by researchersfrom CEC, China, Finland, France, Germany, Japan, Spain and Taiwan

  3. Water reactor fuel research at the Joint Research Centre of the Commission of the European Union

    Energy Technology Data Exchange (ETDEWEB)

    Markgraf, J [HFR Unit, Inst. for Advanced Materials, Petten (Netherlands)

    1997-12-01

    The JRC programmes 1995-1998 are in progress within 8 JRC Institutes located within different research centres situated in five member states of the European Union. Except for the area of reactor safety and waste management, there are no JRC research programmes related to water reactor fuel directly. However, the JRC is providing support on basis of contracts and cooperations to bilateral and international R and D programmes through access to its large test facilities like the High Flux Reactor at the JRC Petten and the hot cell facilities of the Transuranium Institute at the JRC Karlsruhe. Access is available to customers from all over the world. 3 tabs.

  4. Proceedings of the US Nuclear Regulatory Commission nineteenth water reactor safety information meeting

    International Nuclear Information System (INIS)

    Weiss, A.J.

    1992-04-01

    This three-volume report contains 83 papers out of the 108 that were presented at the Nineteenth Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, during the week of October 28--30, 1991. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included 14 different papers presented by researchers from Canada, Germany, France, Japan, Sweden, Taiwan, and USSR. This document, Volume 2, presents papers on: Severe accident research; Severe accident and policy implementation; and Accident management. The individual papers have been cataloged separately

  5. Setup and commissioning of a combined water detritiation and isotope separation experiment at the Tritium Laboratory Karlsruhe

    Energy Technology Data Exchange (ETDEWEB)

    Welte, S., E-mail: stefan.welte@kit.edu; Cristescu, I.; Dittrich, H.; Lohr, N.; Melzer, C.; Michling, R.; Plusczyk, C.; Schaefer, P.

    2013-10-15

    Highlights: • Technical scale, tritium compatible liquid phase catalytic exchange (LPCE). • Technical scale, tritium compatible cryogenic distillation. • Combines processing option for tritiated water and isotope separation. -- Abstract: The European union in kind supply for the ITER fuel cycle development consists, among others, of the water detritiation system (WDS) and the isotope separation system (ISS). In order to mitigate the release of tritium to the environment, these systems are combined by feeding hydrogen exhaust from the ISS into the WDS for final processing. Therefore, the WDS is the final tritium barrier before releasing hydrogen (H{sub 2}) exhaust to the environment. The TRENTA 4 scaled prototype facility at TLK is based on combination of the combined electrolysis and catalytic exchange (CECE) process and a cryogenic distillation (CD) process. All components are fully tritium compatible and controlled using a state of the art control system for process automation, backed up by an additional dedicated safety system. The paper will give a detailed overview of the current experimental facility including all process components. Furthermore the paper will present the results of the functional test of the WDS/ISS combination using protium and deuterium, as well the results of the first commissioning runs using HTO of approximately 5 × 10{sup 9} Bq kg{sup −1} activity concentration.

  6. Hydraulic residence time and iron removal in a wetland receiving ferruginous mine water over a 4 year period from commissioning.

    Science.gov (United States)

    Kusin, F M; Jarvis, A P; Gandy, C J

    2010-01-01

    Analysis of residence time distribution (RTD) has been conducted for the UK Coal Authority's mine water treatment wetland at Lambley, Northumberland, to determine the hydraulic performance of the wetland over a period of approximately 4 years since site commissioning. The wetland RTD was evaluated in accordance with moment analysis and modelled based on a tanks-in-series (TIS) model to yield the hydraulic characteristics of system performance. Greater hydraulic performance was seen during the second site monitoring after 21 months of site operation i.e. longer hydraulic residence time to reflect overall system hydraulic efficiency, compared to wetland performance during its early operation. Further monitoring of residence time during the third year of wetland operation indicated a slight reduction in hydraulic residence time, thus a lower system hydraulic efficiency. In contrast, performance during the fourth year of wetland operation exhibited an improved overall system hydraulic efficiency, suggesting the influence of reed growth over the lifetime of such systems on hydraulic performance. Interestingly, the same pattern was found for iron (which is the primary pollutant of concern in ferruginous mine waters) removal efficiency of the wetland system from the second to fourth year of wetland operation. This may therefore, reflect the maturity of reeds for maintaining efficient flow distribution across the wetland to retain a longer residence time and significant fractions of water involved to enhance the extent of treatment received for iron attenuation. Further monitoring will be conducted to establish whether such performance is maintained, or whether efficiency decreases over time due to accumulation of dead plant material within the wetland cells.

  7. Commissioning MMS

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  8. Design, development, installation and commissioning of water-cooled pre-masks for undulator front-ends of Indus-2

    International Nuclear Information System (INIS)

    Raghuvanshi, V.K.; Prasad, Vijendra; Garg, S.R.; Jain, Vikas

    2015-01-01

    Recently two undulators U1 and U2 are installed in Indus-2 storage ring at RRCAT, Indore. When U1 and U2 are put in operation, a bright synchrotron radiation (SR) is produced which is transmitted through the zero degree port of the dipole vacuum chamber. In addition, a part of SR beam from the bending magnets, at the upstream and downstream of the undulator, is also overlapped with the undulator SR beam and transmitted in to the front-end through the same port. The front-end is a long ultra high vacuum (UHV) assembly consisting of water-cooled pre-mask, water-cooled shutters, UHV valves, diagnostic devices, safety shutter, vacuum pumps etc which acts as an interface between Indus-2 ring and beamline. Water-cooled pre- masks have been designed to cut a part of unwanted SR beam from the bending magnets. The pre-mask is a first active component in the undulator front-end which is also capable of absorbing high thermal load due to mis-steering of the SR beam from the undulator in the worst case scenario. The watercooled pre-mask consists of a copper block which has fixed aperture with slant faces to distribute the heat flux over a large surface area. The cooling channels are made on outer periphery of the block. The copper block is vacuum brazed with two conflat flanges of stainless steel at the two ends. The pre-mask is designed to absorb thermal load of 3 kW of synchrotron beam from undulator U1 and 2 kW of synchrotron beam from undulator U2. The thermal analysis of the pre-masks was carried out with the help of ANSYS® and the design was optimized with different cooling configurations. The main design criteria was to limit the maximum temperature of the mask less than 60 °C. This is to avoid substantial thermal outgassing from the heated portion which may deteriorate the ultra high vacuum. Pre-masks have been successfully tested, installed and commissioned with synchrotron beam in the undulator front-ends and are operating under vacuum of 5x10 -10 mbar. (author)

  9. Commission 1

    African Journals Online (AJOL)

    state" to provide the Commission with information on the measures that they have ...... policies and identify the gaps in ensuring the full realisation of socio- economic .... Boulle L, Harris Band Hoexter C Constitutional and Administrative Law.

  10. Joint Commission

    Science.gov (United States)

    ... for the latest publication of The Joint Commission Journal on Quality and Patient Safety (JQPS). . How We Work Process improvement program breeds quality culture, empowers staff An article in Quality Progress, June ...

  11. Uranium hydrogeochemical and stream sediment reconnaissance of the Dalhart NTMS quadrangle, New Mexico/Texas/Oklahoma, including concentrations of forty-two additional elements

    International Nuclear Information System (INIS)

    Morgan, T.L.

    1980-08-01

    Totals of 1583 water samples and 503 sediment samples were collected from 2028 locations within the 20 000-km 2 area of the quadrangle at an average density of one location per 9.86 km 2 . Water samples were collected from wells, springs, and streams and were analyzed for uranium. Sediment samples were collected from streams and springs and were analyzed for uranium, thorium, and 41 additional elements. All field and analytical data are listed in the appendixes of this report. Discussion is limited to anomalous samples, which are considered to be those containing over 20 ppB uranium for waters and over 5 ppM uranium for sediments. Uranium concentrations in water samples range from below the detection limit of 0.2 ppB to 1457.65 ppB and average 7.41 ppB. Most of the seventy anomalous water samples (4.4% of all water samples) are grouped spatially into five clusters or areas of interest. Samples in three of the clusters were collected along the north edge of the quadrangle where Mesozoic strata are exposed. The other two clusters are from the central and southern portions where the Quaternary Ogallala formation is exposed. Sediment samples from the quadrangle have uranium concentrations that range from 0.90 ppM to 27.20 ppM and average 3.27 ppM. Fourteen samples (2.8% of all sediment samples) contain over 5 ppM uranium and are considered anomalous. The five samples with the highest concentrations occur where downcutting streams expose Cretaceous units beneath the Quaternary surficial deposits. The remaining anomalous sediment samples were collected from scattered locations and do not indicate any single formation or unit as a potential source for the anomalous concentrations

  12. Comparison of Standard Light Water Reactor Cross-Section Libraries using the United States Nuclear Regulatory Commission Boiling Water Reactor Benchmark Problem

    Directory of Open Access Journals (Sweden)

    Kulesza Joel A.

    2016-01-01

    Full Text Available This paper describes a comparison of contemporary and historical light water reactor shielding and pressure vessel dosimetry cross-section libraries for a boiling water reactor calculational benchmark problem. The calculational benchmark problem was developed at Brookhaven National Laboratory by the request of the U. S. Nuclear Regulatory Commission. The benchmark problem was originally evaluated by Brookhaven National Laboratory using the Oak Ridge National Laboratory discrete ordinates code DORT and the BUGLE-93 cross-section library. In this paper, the Westinghouse RAPTOR-M3G three-dimensional discrete ordinates code was used. A variety of cross-section libraries were used with RAPTOR-M3G including the BUGLE93, BUGLE-96, and BUGLE-B7 cross-section libraries developed at Oak Ridge National Laboratory and ALPAN-VII.0 developed at Westinghouse. In comparing the calculated fast reaction rates using the four aforementioned cross-section libraries in the pressure vessel capsule, for six dosimetry reaction rates, a maximum relative difference of 8% was observed. As such, it is concluded that the results calculated by RAPTOR-M3G are consistent with the benchmark and further that the different vintage BUGLE cross-section libraries investigated are largely self-consistent.

  13. Water disinfection in the mountains - state of the art recommendation paper of the Union Internationale des Associations d'Alpinisme Medical Commission.

    Science.gov (United States)

    Küpper, Thomas E A H; Schöffl, Volker; Milledge, Jim S

    2009-01-01

    This paper provides the official recommendation of the Union Internationale des Associations d'Alpinisme (UIAA) Medical Commission to manage the problem of safe drinking water. The recommendation was accepted and authorized for publication by the Medical Commission during their annual meeting at Treplice, Tzechia, 2008. Safe water is essential for mountaineers worldwide in order to balance challenges associated with high altitude dehydration. The paper summarizes the advantages and disadvantages of several procedures used to procure safe drinking water in the mountains or at high altitude. Limitations or critical details, which may cause failure of the methods are mentioned systematically. We differentiate between "conventional" methods, which should be preferred because they produce safe water and "improvisation". The latter does not produce safe water but may be used if conventional methods are not available for any reason. They decrease the concentration of pathogenic microorganisms and by this they reduce the risk of enteral infection. Water filtration using a ceramic filter system or chemical disinfection is recommended as a standard method. Boiling water should be avoided because it is too fuel consuming and has the potential to increase deforestation. Generally, with regard to infections by water or food, all mountaineers should be vaccinated against hepatitis A and poliomyelitis in regions where they may be at-risk.

  14. Uranium Hydrogeochemical and Stream Sediment Reconnaissance data release for the New Mexico portions of the Hobbs and Brownfield NTMS quadrangles, New Mexico/Texas

    International Nuclear Information System (INIS)

    Warren, R.G.; Nunes, H.P.

    1978-06-01

    U concentrations in waters approximate a lognormal distribution with a mean of 4.73 parts per billion (ppB) for the combined water samples from the western halves of both quadrangles. The highest U concentration found in a water sample is 139.7 ppb. About 93% of these samples were collected from 1008 wells. Of the remainder, 1 sample was collected from a spring and 75 samples were collected from combined surface water sources of artificial and natural ponds. The mean U content of the samples from surface water sources (7.63 ppB) is higher than that of the samples from wells (4.50 ppB). The water samples having the highest U content are from wells and ponds in the western, and especially the northwestern, portion of the Brownfield quadrangle. Most waters containing less than 20 ppB U were collected from areas in which the Dockum group underlies a thin veneer of surficial deposits, near the edge of the caprock, or from saline ponds. The U concentrations in sediments approximate a normal distribution with a mean of 2.18 ppM for the 914 sediment samples collected from the western halves of both quadrangles. The highest U value found in a sediment sample is 19.3 ppM. Sediments were collected from 154 dry streams, 522 dry natural ponds, 166 dry artificial ponds, and a total of 72 wet natural ponds, wet artificial ponds, and springs. The mean U content for sediments derived from the wet sources (2.77 ppM) is noticeably higher than that from dry sources (2.11 ppM).The highest U contents within the report area generally are associated with sediments collected from locations in which the Dockum group underlies a thin cover of surficial deposits. A cluster of seven sediments containing more than 3.0 ppM U is centered at 33 0 34'N, 103 0 53'W, where a U occurrence is reported at the Hoffacker test hole in the middle Dockum group

  15. Removal of radon by aeration testing of various aeration techniques for small water works. For European Commission under Contract No FI4PCT960054 TENAWA project

    CERN Document Server

    Salonen, L; Mehtonen, J; Mjoenes, L; Raff, O; Turunen, H

    2002-01-01

    Capability of various aeration techniques to remove radon from water in small waterworks was studied as a part of project (Treatment Techniques for Removing Natural Radionuclides from Drinking Water), which was carried out during 1997-1999 on a cost-shared basis (contract No. F14PCT960054) with The European Commission (CEC) under the supervision of the Directorate-General XII Radiation Protection Research Unit. In TENAWA project both laboratory and field experiments were performed in order to find reliable methods and equipment for removing natural radionuclides from ground water originating either from private wells or small waterworks. Because such techniques are more often needed in private households than at waterworks, the main emphasis of the research was aimed to solve the water treatment problems related to the private water supplies, especially bedrock wells. Radon was the most important radionuclide to be removed from water at waterworks whereas the removal of other radionuclides ( sup 2 sup 3 sup 4...

  16. Announcement of recommendations issued by the German Radiation Protection Commission (Strahlenschutzkommission) - radiation protection for the use of drinking water supplies from uranium mining areas

    International Nuclear Information System (INIS)

    1993-01-01

    The recommendations issued by the German Radiation Protection Commission demand analyses of the activities of natural uranium, radium 226 and lead 210 in drinking water. The concentrations of lead 210 and polonium 210 are assumed to be balanced. The conditions for observation of the maximum permissible activities are given. The activities of radium 228 and radium 224 must be determined and be taken into account. (orig.) [de

  17. Determination of total flow rate and flow rate of every operating branch in commissioning of heavy water loop for ARR-2

    International Nuclear Information System (INIS)

    Han Yan

    1997-01-01

    The heavy water loop (i,e, RCS) for ARR-2 in Algeria is a complex loop. Flow regulating means are not provided by the design in order to operate the reactor safely and simplify operating processes. How to determine precisely the orifice diameters of resistance parts for the loop is a key point for decreasing deviation between practical and design flow rates. Commissioning tests shall ensure that under every one of combined operating modes for the pumps, total coolant flow rate is about the same (the number of pumps operating in parallel is the same) and is consistent with design requirement, as well as the distribution of coolant flow rate to every branch is uniform. The flow Determination is divided into two steps. First and foremost, corresponding resistance part at each pump outlet is determined in commissioning test of shorted heavy water loop with light water, so that the problem about uniform distribution of the flow rate to each branch is solved, Secondly, resistance part at the reactor inlet is determined in commissioning test of heavy water loop connected with the vessel, so that the problem about that total heavy water flow rate is within optimal range is solved. According to practical requirements of the project, a computer program of hydraulic calculation and analysis for heavy water loop has been developed, and hydraulic characteristics test for a part of loop has been conducted in order to correct calculation error. By means of program calculation combining with tests in site, orifice diameters of 9 resistance parts has been determined rapidly and precisely and requirements of design and operation has been met adequately

  18. Charter on ground-water management as adopted by the Economic Commission for Europe at its forty-fourth session (1989) by decision E (44)

    International Nuclear Information System (INIS)

    1989-01-01

    Ground water - as a natural resource with both ecological and economic value is of vital importance for sustaining life, health and the integrity of ecosystems. This resource is, however, increasingly threatened by over-use and insidious long-term effects of pollution. Pollution comes from both point sources and diffuse sources. Potential risks or actual impacts could permanently impair underground water resources, with far-reaching and unpredictable implications for present and future generations. Action is urgently needed. The Charter on Ground-water Management provides policy measures for such action. The Charter on Ground-water Management gives broad support to ECE member Governments in their common endeavors to protect ground water by providing planners and decision-makers with appropriate policy instruments. Publication of the Charter is intended to heighten public awareness of the need for concerted action to protect ground water. The Commission has recommended that member Governments apply the provisions of the Charter when formulating, adopting and implementing water-related policies and strategies at both national and international levels

  19. Alien invasive species and biological pollution of the Great Lakes Basin ecosystem[Great Lakes Water Quality Board : Report to the International Joint Commission

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-05-01

    The displacement of important native species in the Great Lakes is a result of an invasion by a succession of non indigenous aquatic species. These invasion also resulted in interference with the proper human water uses and cost billions of dollars. The problem was considered serious enough that the International Joint Commission asked the Great Lakes Water Quality Board in 1999 to review the regulations in place and make recommendations, if necessary, for the implementation of additional measures that could be considered to keep control over the introduction of alien invasive species. Escapes from aquaria, aquaculture, research and educational facilities, canal and diversion water flows, and release of live bait are all sources of this invasion. The effectiveness of alternative technologies to control the invasion was to be examined by the Board. Other efforts taking place to address the situation in the basin are being complemented by the publication of this report. It is considered that the most important source of alien invasive species (AIS) to the Great Lakes is the discharge of ballast water from shipping vessels coming from outside the United States and Canada. A major concern is the role played by vessels reporting no ballast on board (NOBOB) upon entering the basin. A number of recommendations were made concerning: (1) implementation and enforcement of the ballast water discharge standards agreed upon by both countries, (2) the evaluation of the effectiveness of alternative technologies to achieve ballast water discharge standards over the long term, combined with the use of chemical treatment while the evaluation is being performed, (3) the implementation of optimal management practices to control sediments in shipping vessels, (4) modifications to the design of shipping vessels, and (5) the monitoring and contingency plans in the event of a repeat scenario in the future. Composed of an equal number representatives from the United States and Canada, at

  20. Pre-commissioning activities of exchange units of Heavy Water Plant, Manuguru (Paper No. 1.2)

    International Nuclear Information System (INIS)

    Kamath, H.S.; Sikaria, R.P.

    1992-01-01

    Heavy Water Plant, Manuguru (HWPM) comprises of two exchange units where enrichment of deuterium from natural concentration to 15% concentration is achieved using dual temperature H 2 S-H 2 O exchange process in a three stage cascade. In each exchange unit an inventory of around 200 MT of H 2 S gas is required under normal operating pressure and a feed water flow rate of 450 MT/Hr is required to be maintained. In view of the large flow rates of H 2 S circulating gas, water, cooling water, steam etc., the lines sizes in exchange unit are quite large. Further, H 2 S gas being highly toxic and corrosive, extreme care is required in order to ensure integrity and leak tightness. While due care is taken in material selection, design, quality surveillance etc., during fabrication, certain additional measures are required to be taken during precommissioning of the systems handling H 2 S under pressure. This paper deals with the activities from completion of plant erection including hydrotesting of piping by the piping contractor to the stage of trial production run. (author)

  1. Conclusion of the commission for determining wear out of Avala heavy water pump bearings - Annex 1; Prilog1 - Zakljucak komisije za utvrdjivanje istrosenosti lezista teskovodne pumpe Avala

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Bratic, A; Zaric, Z; Vidmar, M; Kirilin, J [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    After dismantling of the CEN-132 pump the findings of the Commission were: the wear-out of the surfaces of the pump bearings and one disc caused appearance of about 39 grams of cobalt in the heavy water system of the reactor. This report includes: results of chemical analysis of stellite taken form pump disc, results of measuring the wear-out of the upper pump bearing, drawing of the worn-out disc and upper cladding of the pump, and a photo of the upper surface of the disc. [Serbo-Croat] Posle demontaze pumpe CEN-132, pregleda detalja i izvrsenih merenja komisija je konstatovala da je zbog istrosenosti lezista diska pumpe i istrosenosti gornje caure u teskovodni sistem dospelo ukupno 39 grama kobalta. Ovaj dokument sadrzi i rezultate hemijske analize stelita skinutog sa diska pumpe, rezultate merenja istrosenosti gornjeg lezista teskovodne pumpe, crteze istrosnog diska skinutog sa pumpe, crteze gornje caure, fotografiju gornje povrsine diska.

  2. Proceedings of the US Nuclear Regulatory Commission twentieth water reactor safety information meeting; Volume 2, Severe accident research, Thermal hydraulics

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, A.J. [comp.] [Brookhaven National Lab., Upton, NY (United States)

    1993-03-01

    This three-volume report contains papers presented at the Twentieth Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, during the week of October 21--23, 1992. The papers describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included 10 different papers presented by researchersfrom CEC, China, Finland, France, Germany, Japan, Spain and Taiwan. Selected papers have been processed separately for inclusion in the Energy Science and Technology Database.

  3. Canada's Response to the Recommendations in the Tenth Biennial Report on Great Lakes Water Quality of the International Joint Commission

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The Government of Canada and Ontario are currently renegotiating the Canada-Ontario Agreement Respecting the Great Lakes Basin Ecosystem (COA). They are committed to restoring and maintaining the basin's chemical, physical and biological integrity and ensuring that it has a healthy, sustainable future. The COA has established a strategic framework for coordinated federal-provincial responsibilities regarding the Great Lakes basin ecosystem. This document presents responses to the recommendations of the International Joint Commission's (IJC) Tenth Biennial Report on how to improve the performance and effectiveness of government programs such as the Great Lakes Water Quality Agreement. According to the IJC, there are many challenges ahead, including: cleanup of Canadian Areas of Concern; controlling and preventing the further introduction of exotic species; mitigating the impact of rapid urban growth on environmental conditions throughout the basin; and reducing contaminants transported in the atmosphere over long distances to the Great Lakes. This document presented the government's responses to each of the following IJC recommendations regarding remedial action plans, threats to human health with respect to consumption of fish, contaminated sediment, airborne toxic substances, Great Lakes binational toxics strategy, land use, alien invasive species, and information and data management. IJC also recommended that indicators should be reported regarding whether the Great Lakes surface waters are suitable for drinking, swimming and whether fish are edible.

  4. Removal of radon by aeration: testing of various aeration techniques for small water works. For European Commission under Contract No FI4PCT960054 TENAWA project

    International Nuclear Information System (INIS)

    Salonen, L.; Mehtonen, J.; Turunen, H.; Mjoenes, L.; Hagberg, N.; Raff, O.

    2002-12-01

    Capability of various aeration techniques to remove radon from water in small waterworks was studied as a part of project (Treatment Techniques for Removing Natural Radionuclides from Drinking Water), which was carried out during 1997-1999 on a cost-shared basis (contract No. F14PCT960054) with The European Commission (CEC) under the supervision of the Directorate-General XII Radiation Protection Research Unit. In TENAWA project both laboratory and field experiments were performed in order to find reliable methods and equipment for removing natural radionuclides from ground water originating either from private wells or small waterworks. Because such techniques are more often needed in private households than at waterworks, the main emphasis of the research was aimed to solve the water treatment problems related to the private water supplies, especially bedrock wells. Radon was the most important radionuclide to be removed from water at waterworks whereas the removal of other radionuclides ( 234,238 U, 226,228 Ra, 210 Pb and 210 Po) was oft required from radonrich bedrock waters. The currently available methods and equipment were mainly tested during the field and laboratory experiments but the project was also aimed to find new materials, absorbents and membranes applicable for radionuclide removal from various types of ground waters (e.g. soft, hard, acidic). Because iron, manganese or organic occur in waters with radionuclides, their simultaneous removal was also studied. The project was divided into 13 work packages. In this report the results of the work package 2.2 are described. Elevated levels of radon and other natural radionuclides in European ground waters have been observed mainly in wide areas of the crystalline Scandinavian bedrock, especially in the granite rock areas of Finland and Sweden but also in more limited crystalline rock areas of Central and Southern Europe, Ukraine and Scotland. The radon removal efficiencies of different aeration methods

  5. Regulation No. 100/2006 Coll. of the Ministry of Health of the Slovak Republic dated as of February 6, 2006 laying down the requirements for natural healing water and natural mineral water, Balneology details of the report, distribution, extent of monitoring and content analysis of natural healing waters and natural mineral waters and their products and requirements for entry to the list of accredited laboratories maintained by the State Commission bathroom

    International Nuclear Information System (INIS)

    2006-01-01

    This Regulation provides: (a) requirements for natural healing water and natural mineral water; (b) requirements for the recognition of natural mineral water; (c) details of balneology report; (d) distribution of natural healing waters and natural mineral water; (e) the extent of tracking of natural healing waters and natural mineral waters and their products; (f) content analysis of natural healing waters and natural mineral waters and their products; (g) registration requirements for accredited laboratories in the list maintained by the State Commission bathroom. This Regulation came into force on March 1, 2006.

  6. 18 CFR 388.104 - Informal advice from Commission staff.

    Science.gov (United States)

    2010-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Commission staff. (a) The Commission staff provides informal advice and assistance to the general public and... expressed by the staff do not represent the official views of the Commission, but are designed to aid the...

  7. The World Commission on Dams: A fundamental step towards integrated water resources management and poverty reduction? A pilot case in the Lower Zambezi, Mozambique

    Science.gov (United States)

    Scodanibbio, Lucia; Mañez, Gustavo

    The Cahora Bassa dam in the Lower Zambezi has undoubtedly brought varied economic benefits (such as hydroelectricity) to Mozambique. There is also, however, evidence of certain negative impacts that have increased the vulnerability of downstream populations. Specifically, current water management practices in the Zambezi have affected people’s livelihoods by the frequent unpredictable releases of water that wash away riverbank crops, impoverish fish stocks and fish habitat, and threaten the valuable shrimp exports. These releases have also worsened the effects of large floods, for example the floods of 2001. The ecosystem of the Zambezi delta, which is a Ramsar site, has also suffered since Cahora Bassa’s regulation. The Mozambican government is proposing to construct a new dam downstream of Cahora Bassa at Mphanda Nkuwa. In the feasibility study, there was no due consideration of rural downstream communities and their livelihoods. This has left many potentially affected people uninformed and vulnerable to the risks associated with the new development. The new dam is likely to worsen the already severe impacts of Cahora Bassa. The World Commission on Dams (WCD) developed seven strategic priorities, designed to inform all decisions related to future dam developments. These priorities follow principles of public participation, social equity, environmental sustainability, economic efficiency and accountability. The WCD proposed best-practice guidelines for both addressing existing dams and for any future ones which are planned. According to the WCD, affected communities have a right to participate in the decision to build a dam, they should be the first to benefit from the project, and the rivers on which their livelihoods are based should be protected. Stakeholder participation is one of the fundamental components of integrated water resources management (IWRM). For effective participation in dam projects, affected people need to be empowered, have access to

  8. Commissioning of the nuclear power plant

    International Nuclear Information System (INIS)

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  9. Commissioning the SNO+ Detector

    Science.gov (United States)

    Caden, E.; Coulter, I.; SNO+ Collaboration

    2017-09-01

    SNO+ is a multipurpose liquid scintillator neutrino experiment based at SNOLAB in Sudbury, Ontario, Canada. The experiment’s main physics goal is a search for neutrinoless double beta decay in Tellurium-130, but SNO+ will also study low energy solar neutrinos, geo- and reactor-antineutrinos, among other topics. We are reusing much of the hardware from the original SNO experiment, but significant work has taken place to transform the heavy water detector into a liquid scintillator detector. We present upgrades and improvements to the read-out electronics and trigger system to handle the higher data rates expected by a scintillator experiment. We show the successful installation and testing of a hold-down rope net for the acrylic vessel to counter-act the buoyancy of organic liquid scintillator. We also describe the new scintillator process plant and cover gas systems that have been constructed to achieve the purification necessary to meet our physics goals. We are currently commissioning the experiment with ultra-pure water in preparation for filling with scintillator in early 2017 and present the current status of this work.

  10. Safe LHC beam commissioning

    International Nuclear Information System (INIS)

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  11. Regulatory Commission of Alaska

    Science.gov (United States)

    Map Help Regulatory Commission of Alaska Login Forgot Password Arrow Image Forgot password? View Cart login Procedures for Requesting Login For Consumers General Information Telephone Electric Natural Gas

  12. Guidelines for residential commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  13. Commission on Legal Matters

    CERN Multimedia

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  14. The Lhc beam commissioning

    International Nuclear Information System (INIS)

    Redarelli, S.; Bailey, R.

    2008-01-01

    The plans for the Lhc proton beam commissioning are presented. A staged commissioning approach is proposed to satisfy the request of the Lhc experiments while minimizing the machine complexity in early commissioning phases. Machine protection and collimation aspects will be tackled progressively as the performance will be pushed to higher beam intensities. The key parameters are the number of bunches, k b , the proton intensity pe bunch, N, and the β in the various interaction points. All together these parameters determine the total beam power and the complexity of the machine. We will present the proposed trade off between the evolution of these parameters and the Lhc luminosity performance.

  15. The Danish Welfare Commission

    DEFF Research Database (Denmark)

    Gjerding, Allan Næs

    2006-01-01

    on public services, and install economic incentives for the behaviour of private households. The paper then digs into the proposals of the commission that are broadly grouped into five policy target areas con-cerning (1) the ageing of the population, (2) the incentives for labour market participation, (3......The paper deals with the main report of the Danish Welfare Commission and the one-hundred-and-nine proposals on the structure of the future Danish welfare state that the com-mission has put forward. Following upon a brief review of the discussion on the work of the Danish Welfare Commission......) competitiveness in the global economy, (4) behavioural regulation of the use of public bene-fits and services, and (5) management within tight budgets of an increasing demand on health and care. Finally, the concluding section sums up the discussion and elaborates on the debate on the Welfare Commission’s work...

  16. Commissioning for Humidified Buildings

    National Research Council Canada - National Science Library

    Deal, Brian

    1998-01-01

    .... Although proper commissioning procedures have been noted to reduce the potential for approximately 70 percent of these claims, no standards exist for the control of moisture migration in building...

  17. Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission Issuance

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  11. Commissioning of ATLAS

    CERN Document Server

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  12. ATF2 Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  13. ATF2 COMMISSIONING

    CERN Document Server

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  14. 78 FR 32295 - Commission Meeting

    Science.gov (United States)

    2013-05-29

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: June 20...

  15. 77 FR 10599 - Commission Meeting

    Science.gov (United States)

    2012-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 15...

  16. 78 FR 12412 - Commission Meeting

    Science.gov (United States)

    2013-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 21...

  17. 77 FR 28420 - Commission Meeting

    Science.gov (United States)

    2012-05-14

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: June 7, 2012, at 9...

  18. 78 FR 52601 - Commission Meeting

    Science.gov (United States)

    2013-08-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: September 19, 2013...

  19. 77 FR 70204 - Commission Meeting

    Science.gov (United States)

    2012-11-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the SUPPLEMENTARY INFORMATION section of this notice. DATES: December 14, 2012...

  20. 78 FR 69517 - Commission Meeting

    Science.gov (United States)

    2013-11-19

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: December 12, 2013...

  1. 77 FR 52106 - Commission Meeting

    Science.gov (United States)

    2012-08-28

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: September 20...

  2. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  20. DESY: HERA commissioning

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  1. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  5. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. 18 CFR 375.102 - Custody and authentication of Commission records.

    Science.gov (United States)

    2010-04-01

    ... authentication of Commission records. 375.102 Section 375.102 Conservation of Power and Water Resources FEDERAL... Provisions § 375.102 Custody and authentication of Commission records. (a) Custody of official records. (1...) Authentication of Commission action. All orders and other actions of the Commission shall be authenticated or...

  19. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 1. Investigation and evaluation of stress corrosion cracking in piping of boiling water reactor plants

    International Nuclear Information System (INIS)

    1984-08-01

    IGSCC in BWR piping is occurring owing to a combination of material, environment, and stress factors, each of which can affect both the initiation of a stress-corrosion crack and the rate of its subsequent propagation. In evaluating long-term solutions to the problem, one needs to consider the effects of each of the proposed remedial actions. Mitigating actions to control IGSCC in BWR piping must be designed to alleviate one or more of the three synergistic factors: sensitized material, the convention BWR environment, and high tensile stresses. Because mitigating actions addressing each of these factors may not be fully effective under all anticipated operating conditions, mitigating actions should address two and preferably all three of the causative factors; e.g., material plus some control of water chemistry, or stress reversal plus controlled water chemistry

  20. Quarterly technical progress report on water reactor safety programs sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, April--June 1977

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-01

    Results from the previously conducted Semiscale Mod-1 ECC injection test series were analyzed. Testing in the LOFT counterpart test series was essentially completed, and the steam generator tube rupture test series was begun. Two tests in the alternate ECC injection test series were conducted which included injection of emergency core coolant into the upper plenum through use of the low pressure injection system. The Loss-of-Fluid Test Program successfully completed nonnuclear Loss-of-Coolant Experiment L1-4. A nuclear test, GC 2-3, in the Power Burst Facility Reactor was performed to evaluate the power oscillation method of determining gap conductance and to determine the effects of initial gap size, fill gas composition, and fuel density on the thermal performance of a light water reactor fuel rod. Additional test results were obtained relative to the behavior of irradiated fuel rods during a fast power increase and during a high power film boiling transient. Fuel model development and verification activities continued for the steady state and transient Fuel Rod Analysis Program, FRAP-S and FRAP-T. A computer code known as RELAP4/MOD7 is being developed to provide best-estimate modeling for reflood during a postulated loss-of-coolant accident (LOCA). A prediction of the fourth test in the boiling water reactor (BWR) Blowdown/Emergency Core Cooling Program was completed and an uncertainty analysis was completed of experimental steady state stable film boiling data for water flowing vertically upward in round tubes. A new multinational cooperative program to study the behavior of entrained liquid in the upper plenum and cross flow in the core during the reflood phase of a pressurized water reactor LOCA was defined.

  1. Survey commission of the Manche center

    International Nuclear Information System (INIS)

    2002-01-01

    The subjects discussed during the Survey commission of the storage center of the Manche CSCM, held in october 2001, are presented in this document. They deal with the site survey, the maintenance facilities realized on this installations, the tritium survey in the water and the CSCM operating. (A.L.B.)

  2. Commissioning of the LHC

    CERN Multimedia

    CERN. Geneva

    2007-01-01

    The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety nd Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  6. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  7. BROOKHAVEN: Booster commissioned

    Energy Technology Data Exchange (ETDEWEB)

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  8. Commission on Social Security

    CERN Multimedia

    Staff Association

    2010-01-01

    A commission studying past, present, and future social stakes ! For many years we have been hearing about the problems of funding of health insurance benefits in our different Member States. At CERN we are not totally immune from this problem.  To start with, let us recall that we have a mutual-benefit scheme which covers everyone for the consequences of the uncertainties in life (illness and accidents). The rules of our scheme are established by CERN in the framework of a sub-group of the Standing Concertation Committee, the CERN Health Insurance Scheme Board (CHISB), which is also in charge of managing the scheme.  The work of the “ProtSoc” (Protection Sociale – Social Security) commission, as we like to call it at the Staff Association, is to help your representatives on the CHISB, by preparing together with them the subjects and positions to be put forward and defended. This commission, which groups together the staff delegates who wish to invest their ...

  9. Proceedings of the US Nuclear Regulatory Commission fifteenth water reactor safety information meeting: Volume 6, Decontamination and decommissioning, accident management, TMI-2

    International Nuclear Information System (INIS)

    Weiss, A.J.

    1988-02-01

    This six-volume report contains 140 papers out of the 164 that were presented at the Fifteenth Water Reactor Safety Information Meeting held at the National Bureau of Standards, Gaithersburg, Maryland, during the week of October 26-29, 1987. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. This report, Volume 6, discusses decontamination and decommissioning, accident management, and the Three Mile Island-2 reactor accident. Thirteen reports have been cataloged separately

  10. Quarterly technical progress report on water reactor safety programs sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, October--December 1975

    International Nuclear Information System (INIS)

    1976-05-01

    Light water reactor safety activities performed during October--December 1975 are reported. The blowdown heat transfer tests series of the Semiscale Mod-1 test program was completed. In the LOFT Program, preparations were made for nonnuclear testing. The Thermal Fuels Behavior Program completed a power-cooling-mismatch test and an irradiation effects test on PWR-type fuel rods. Model development and verification efforts of the Reactor Behavior Program included developing new analysis models for the RELAP4 computer code, subroutines for the FRAP-S and FRAP-T codes, and new models for predicting reactor fuel restructuring and zircaloy cladding behavior; an analysis of post-CHF fuel behavior was made using FRAP-T

  11. Quarterly technical progress report on water reactor safety programs sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, October--December 1975

    Energy Technology Data Exchange (ETDEWEB)

    1976-05-01

    Light water reactor safety activities performed during October--December 1975 are reported. The blowdown heat transfer tests series of the Semiscale Mod-1 test program was completed. In the LOFT Program, preparations were made for nonnuclear testing. The Thermal Fuels Behavior Program completed a power-cooling-mismatch test and an irradiation effects test on PWR-type fuel rods. Model development and verification efforts of the Reactor Behavior Program included developing new analysis models for the RELAP4 computer code, subroutines for the FRAP-S and FRAP-T codes, and new models for predicting reactor fuel restructuring and zircaloy cladding behavior; an analysis of post-CHF fuel behavior was made using FRAP-T.

  12. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  13. A Guide to Building Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  14. Discussion: European Commission policy

    International Nuclear Information System (INIS)

    Coldwell, R.

    1993-01-01

    This paper documents the debate which arose following two papers presented to a seminar run by the Centre for the Study of Regulated Industries, on 11th November 1992, on European Commission (EC) energy policies. The issues raised cover how an internal market for electricity and natural gas will be implemented under a proposed EC directive, bearing in mind the level of opposition from a number of Member States. How this Directive will apply to vertically integrated structures, such as Scottish Electricity Industry, is also considered. (UK)

  15. Commissioning of the SCT

    International Nuclear Information System (INIS)

    Hayward, Helen

    2010-01-01

    In September 2008, the large hadron collider (LHC) at CERN was switched on with successful tests of circulating beam in both directions of the ring. The ATLAS semiconductor tracker (SCT) has been installed in the ATLAS cavern since summer 2007 and then integrated with the rest of the ATLAS subdetectors, in preparation for this event. After the SCT was assembled on the surface, the process of being commissioned using cosmic ray events began, and continued after the SCT was installed in the cavern with the rest of the ATLAS detector. Performance results will be given for the recent cosmic runs.

  16. Quarterly technical progress report on water reactor safety programs sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, October--December 1976

    International Nuclear Information System (INIS)

    Ferguson, J.B.

    1977-04-01

    Light water reactor safety research performed October through December 1976 is discussed. An analysis to determine the effect of emergency core coolant (ECC) injection location and pump speed on system response characteristics was performed. An analysis to evaluate the capability of commonly used critical heat flux (CHF) correlations to calculate the time of the first CHF in the Semiscale core during a loss-of-coolant experiment (LOCE) was performed. A test program and study to determine the effect thermocouples mounted on the outside fuel rod surfaces would have on the departure from nucleate boiling (DNB) phenomena in the LOFT core during steady state operation were completed. A correlation for use in predicting DNB heat fluxes in the LOFT core was developed. Tests of an experimental transit time flowmeter were completed. A nuclear test was performed to obtain fuel rod behavior data from four PWR-type rods during film boiling operation representative of PWR conditions. Preliminary results from the postirradiation examination of Test IE-1 fuel rods are given. Results of Irradiation Effects Tests IE-2 and IE-3 are given. Gap Conductance Test GC 2-1 was performed to evaluate the effects of fuel density, initial gap width, and fill gas composition on the pellet-cladding gap conductance

  17. Quarterly technical progress report on water reactor safety programs sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, October--December 1976

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson, J. B. [ed.

    1977-04-01

    Light water reactor safety research performed October through December 1976 is discussed. An analysis to determine the effect of emergency core coolant (ECC) injection location and pump speed on system response characteristics was performed. An analysis to evaluate the capability of commonly used critical heat flux (CHF) correlations to calculate the time of the first CHF in the Semiscale core during a loss-of-coolant experiment (LOCE) was performed. A test program and study to determine the effect thermocouples mounted on the outside fuel rod surfaces would have on the departure from nucleate boiling (DNB) phenomena in the LOFT core during steady state operation were completed. A correlation for use in predicting DNB heat fluxes in the LOFT core was developed. Tests of an experimental transit time flowmeter were completed. A nuclear test was performed to obtain fuel rod behavior data from four PWR-type rods during film boiling operation representative of PWR conditions. Preliminary results from the postirradiation examination of Test IE-1 fuel rods are given. Results of Irradiation Effects Tests IE-2 and IE-3 are given. Gap Conductance Test GC 2-1 was performed to evaluate the effects of fuel density, initial gap width, and fill gas composition on the pellet-cladding gap conductance.

  18. Quarterly technical progress report on water reactor safety programs sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, January--March 1976

    Energy Technology Data Exchange (ETDEWEB)

    Zane, J. O.; Farman, R. F.; Hanson, D. J.; Peterson, A. C.; Ybarrondo, L. J.; Berta, V. T.; Naff, S. A.; Crocker, J. G.; Martinson, Z. R.; Smolik, G. R.; Cawood, G. W.; Quapp, W. J.; Ramsthaler, J. H.; Ransom, V. H.; Scofield, M. P.; Dearien, J. A.; Bohn, M. P.; Burnham, B. W.; James, S. W.; Lee, W. H.; Lime, J. F.; Nalezny, C. L.; MacDonald, P. E.; Thompson, L. B.; Domenico, W. F.; Rice, R. E.; Hendrix, C. E.; Davis, C. B.

    1976-06-01

    Light water reactor sfaety research performed January through March 1976 is summarized. Results of the Semiscale Mod-1 blowdown heat transfer test series relating to those phenomena that influence core fluid and heat transfer effects are analyzed, and preliminary analyses of the recently completed reflood heat transfer test series are summarized for the forced and gravity feed reflood tests. The first nonnuclear LOCE in the LOFT program was successfully completed and preliminary results are presented. Preliminary results are given for the PCM 8-1 RF Test, the PCM-2A Test, and the Irradiation Effects Scoping Test 2 in the Thermal Fuel Behavior Program. Model development and verification efforts reported in the Reactor Behavior Program include checkout of RELAP4/MOD5 Update 1, development of a new hydrodynamic model for two-phase separated flows, development of the RACHET code to assess the assumptions in current fuel behavior codes of uniform stress and strain in the cladding, modifications of the containment code BEACON, analysis of results from the Halden Assembly IFA-429 helium sorption experiment, development of correlations for the thermal conductivity of UO/sub 2/ and (U,Pu)O/sub 2/, and evaluation of RALAP4 through comparison of calculated results with data from the GE Blowdown Heat Transfer and Semiscale experiments.

  19. Atomic Energy Commission Act, 1963

    International Nuclear Information System (INIS)

    1963-01-01

    Promulgated in 1963, the Atomic Energy Commission Act (204) established and vested in the Ghana Atomic Energy Commission the sole responsibility for all matters relating to the peaceful uses of atomic energy in the country. Embodied in the Act are provisions relating to the powers, duties, rights and liabilities of the Commission. (EAA)

  20. Commissioning of Qinshan phase III PHWR nuclear power plant (2 x 700 MW)

    International Nuclear Information System (INIS)

    Gu Jun

    2004-12-01

    As the first CANDU type NPP built in China, the commissioning team established a very efficient and high standard commissioning management system. Unit 1 was put into commercial operation 43 days in advance and 112 days ahead of schedule for Unit 2. Commissioning quality achieved international advanced level. The commissioning period created new world history record of heavy water nuclear power plants. A summary for the practice and the experience of TQNPC obtained in the commissioning of the two unit was given. (authors)

  1. Commission 4: Ephemerides

    Science.gov (United States)

    Kaplan, George H.; Hohenkerk, Catherine Y.; Fukushima, Toshio; Arlot, Jean-Eudes; Bangert, John A.; Bell, Steven A.; Folkner, William M.; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrák, Jan

    2012-04-01

    The Commission 4 Organizing Committee began its work for the 2009-2012 triennium by revising the commission's terms of reference, which serve as our ``mission statement.'' The new terms of reference are:(a)Maintain cooperation and collaboration between the national offices providing ephemerides, prediction of phenomena, astronomical reference data, and navigational almanacs.(b)Encourage agreement on the bases (reference systems, time scales, models, and constants) of astronomical ephemerides and reference data in the various countries. Promote improvements to the usability and accuracy of astronomical ephemerides, and provide information comparing computational methods, models, and results to ensure the accuracy of data provided.(c)Maintain databases, available on the Internet to the national ephemeris offices and qualified researchers, containing observations of all types on which the ephemerides are based. Promote the continued importance of observations needed to improve the ephemerides, and encourage prompt availability of these observations, especially those from space missions, to the science community.(d)Encourage the development of software and web sites that provide astronomical ephemerides, prediction of phenomena, and astronomical reference data to the scientific community and public.Promote the development of explanatory material that fosters better understanding of the use and bases of ephemerides and related data.

  2. 18 CFR 16.15 - Commission recommendation to Congress.

    Science.gov (United States)

    2010-04-01

    ... recommendation to Congress. 16.15 Section 16.15 Conservation of Power and Water Resources FEDERAL ENERGY... 15 of the Federal Power Act § 16.15 Commission recommendation to Congress. Upon receipt of a... Congress. ...

  3. Commissioning the GTA accelerator

    International Nuclear Information System (INIS)

    Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Bowling, S.; Brown, S.; Cole, R.; Gilpatrick, J.D.; Garnett, R.; Guy, F.W.; Ingalls, W.B.; Johnson, K.F.; Kerstiens, D.; Little, C.; Lohsen, R.A.; Lloyd, S.; Lysenko, W.P.; Mottershead, C.T.; Neuschaefer, G.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Connolly, R.; Weiss, R.; Saadatmand, K.

    1992-01-01

    The Ground Test Accelerator (GTA) is being used to resolve the physics and engineering issues related to accelerating, focusing, and steering a high-brightness, high-current H - beam and then neutralizing it. The goal is to produce a 24 MeV, 50 mA device with a 2% duty factor. Specific features of the GTA -- injector, beam optics, rf linac structures, diagnostics, control and rf power systems are described. The first four steps in commissioning have been completed. The RFQ predicted and measured performances are in good agreement; however, the transmission is lower than specifications. Input emittance is larger than design specifications and increases the effects of image charge and multipoles. Displacement of steering magnets in either the horizontal or vertical plane caused beam displacements in both planes. It is suspected that quadrupole rotation is the cause of the coupled motion. 9 figs., 5 tabs., 11 refs

  4. Safety Commission databases support

    CERN Document Server

    Petit, S; CERN. Geneva. TS Department

    2005-01-01

    A collaboration project between the Safety Commission (SC) and the Controls, Safety and Engineering databases group (TS/CSE) started last year. The aim of this collaboration is to transfer several SC applications from their local environments onto the D7i-MTF EDMS framework, for which the TS/CSE group is responsible. Different domains of activity and projects have been defined in the areas of equipment management, safety inspections, accidents and risks management. Priorities have been established in collaboration with SC. This paper presents the new Safety Inspections Management system (SIM) which will be put in production before the summer 2005 and reviews the constraints of both the users and the development and operational framework that needed to be taken into account. The technical solutions adopted to assure a successful production start-up and operation of the SIM system are described. Progress on other on-going projects and plans for the next year are also reported.

  5. GP commissioning in England.

    Science.gov (United States)

    Charlton, Rodger

    2013-02-01

    The NHS, yet again, is in transition with an emphasis on groups of general practitioners (GPs) (clinical commissioning groups) making decisions on which specialist services should be chosen for patients requiring referral from primary care. It is an area of new terminology with a new language and further change for all working in the NHS and the all-important interface between primary and secondary care, and its impact on teamwork. There are many drivers including choice, efficiency, franchising of services, coordination and leadership in an enormous organisation, but not least reducing costs and keeping to a budget. There are many logistical issues and ethical anxieties, and only time will inform patients, practitioners, stakeholders and politicians as to its success.

  6. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  7. Commissioning of long subsea pipelines - environmental aspects

    International Nuclear Information System (INIS)

    Falck, C.; Kleppe, T.; Maribu, J.

    1997-01-01

    Discharges to air and sea are inevitable during precommissioning and commissioning of long subsea pipelines. Large quantities of water is pumped through the pipeline during these operations. This water is normally treated with corrosion inhibiting chemicals to minimise internal corrosion of the pipeline. Chemicals like methanol or glycol may be used to prevent hydrate formation, and will normally be discharged to sea during commissioning. In order to minimise the environmental impact of these operations, while maintaining corrosion protection, the Norwegian Statoil has been working for several years along three main routes such as to develop concepts and methods that minimise the discharged volumes, the use of the most environmentally friendly chemicals available, and to monitor and identify the effects of discharges to various marine species. 3 refs., 4 figs

  8. A Virtual Commissioning Learning Platform

    DEFF Research Database (Denmark)

    Mortensen, Steffen; Madsen, Ole

    2018-01-01

    The introduction of reconfigurable manufacturing systems (RMS), Industry 4.0 and the associated technologies requires the establishment of new competencies. Towards that goal, Aalborg University (AAU) has developed an Industry 4.0 learning factory, the AAU Smart Production Lab. The AAU Smart...... Production Lab integrates a number of Industry 4.0 technologies for learning and research purposes. One of the many techniques is virtual commissioning. Virtual commissioning uses a virtual plant model and real controllers (PLCs) enabling a full emulation of the manufacturing system for verification. Virtual...... commissioning can lower the commissioning time up to 63%, allowing faster time to market. However, virtual commission is still missing industrial impact one of the reasons being lack of competencies and integration experiences. The paper presents the setup of the virtual commissioning learning platform...

  9. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  10. Liberalism, authority, and bioethics commissions.

    Science.gov (United States)

    MacDougall, D Robert

    2013-12-01

    Bioethicists working on national ethics commissions frequently think of themselves as advisors to the government, but distance themselves from any claims to actual authority. Governments however may find it beneficial to appear to defer to the authority of these commissions when designing laws and policies, and might appoint such commissions for exactly this reason. Where does the authority for setting laws and policies come from? This question is best answered from within a normative political philosophy. This paper explains the locus of moral authority as understood within one family of normative political theories--liberal political theories--and argues that most major "liberal" commentators have understood both the source and scope of ethics commissions' authority in a manner at odds with liberalism, rightly interpreted. The author argues that reexamining the implications of liberalism for bioethics commissions would mean changing what are considered valid criticisms of such commissions and also changing the content of national bioethics commission mandates. The author concludes that bioethicists who participate in such commissions ought to carefully examine their own views about the normative limits of governmental authority because such limits have important implications for the contribution that bioethicists can legitimately make to government commissions.

  11. Commissioning of NSLS-II

    Energy Technology Data Exchange (ETDEWEB)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  12. National Knowledge Commission

    Science.gov (United States)

    Pitroda, Sam

    2007-04-01

    India's National Knowledge Commission (NKC) established by the prime minister is focused on building institutions and infrastructure in Education, Science and Technology, Innovation etc. to meet the challenges of the knowledge economy in the 21st century and increase India's competitive advantage in the global market. India today stands poised to reap the benefits of a rapidly growing economy and a major demographic advantage, with 550 million young people below the age of 25 years, the largest in the world. The NKC is focused on five critical areas of knowledge related to access, concepts, creation, applications and services. This includes a variety of subject areas such as language, translations, libraries, networks, portals, affirmative action, distance learning, intellectual property, Entrepreneurship, application in Agriculture, health, small and medium scale industries, e-governance etc. One of the keys to this effort is to build a national broadband gigabit of networks of 500 nodes to connect universities, Libraries, Laboratories, Hospitals, Agriculture institutions etc. to share resources and collaborate on multidisciplinary activities. This presentation will introduce the NKC, discuss methodology, subject areas, specific recommendation and outline a plan to build knowledge networks and specifics on network architecture, applications, and utilities.

  13. Post commissioning noise study

    International Nuclear Information System (INIS)

    Heraud, P.

    2008-01-01

    This presentation described a wind farm post-commissioning study conducted at a wind farm owned by Helimax Energy Inc. The farm was located in a partly-forested, partly cultivated region in Quebec that featured gently rolling hills. Over 600 dwellings were located within 2 km of the wind farm, and 44 dwellings were within the wind farm's boundaries. The noise impact assessments were conducted at various points near the wind farm. The wind farm was designed using an International Standards Organization (ISO) noise propagation model and a 40 dBA to provide adequate setbacks. The study was conducted using 10 days of continuous measurements at selected points of a wind farm. Points of reception included points from 650 m to 800 m. Noise over 2 km was not thought to be contributed by the wind turbine. The nearest dwelling was 512 m from one of the farm's wind turbines. The study also considered ground factor, temperature, relative humidity, and the height of the receptors. Quebec noise level limits are 40 dBA at night, and 45 dBA during the day. Noise level limits are independent of wind speed. Measured noise contributions over 40 dBA were not observed during the measurement program. The wind turbines were only audible for 1 night out of the 30 night study period. It was concluded that the ISO noise propagation model is a reliable tool for conducting noise impact assessments. tabs., figs

  14. LEIR commissioning successfully completed

    CERN Multimedia

    2006-01-01

    An important milestone has been passed in the preparation of the injector complex to supply ions to the LHC experiments. The LEIR lead-ion beam, seen on one of the control screens just before the PS injection region. The Low-Energy Ion Ring - LEIR for short - has passed its first tests with flying colours. On 12 May, the ring that will accumulate lead ions for the LHC was shut down after seven months of tests (see Bulletin 44/2005). 'The commissioning phase was a resounding success,' enthuses a satisfied Michel Chanel, head of the LEIR construction project. After several months of fine-tuning, the LEIR team has achieved its aim of producing the kind of beam required for first lead-ion collisions in the LHC in 2008. This involved creating bunches containing 230 million ions, in line with the specifications for those first beams. This success can be put down to the machine's outstanding design and components. 'It's a great achivement by all the teams involved in the machine's construction,' underlines Christian...

  15. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  16. Commission 31: Time

    Science.gov (United States)

    Matsakis, Demetrios; Defraigne, Pascale; Hosokawa, M.; Leschiutta, S.; Petit, G.; Zhai, Z.-C.

    2007-03-01

    The most intensely discussed and controversial issue in time keeping has been the proposal before the International Telecommunications Union (ITU) to redefine Coordinated Universal Time (UTC) so as to replace leap seconds by leap hours. Should this proposal be adopted, the practice of inserting leap seconds would cease after a specific date. Should the Earth's rotation continue to de-accelerate at its historical rate, the next discontinuity in UTC would be an hour inserted several centuries from now. Advocates of this proposal cite the need to synchronize satellite and other systems, such as GPS, Galileo, and GLONASS, which did not exist and were not envisioned when the current system was adopted. They note that leap second insertions can be and have been incorrectly implemented or accounted for. Such errors have to date had localized impact, but they could cause serious mishaps involving loss of life. For example, some GPS receivers have been known to fail simply because there was no leap second after a long enough interval, other GPS receivers failed because the leap second information was broadcast more than three months in advance, and some commercial software used for internet time-transfer Network Time Protocol (NTP) could either discard all data received after a leap second or interpret it as a frequency change. The ambiguity associated with the extra second could also disrupt financial accounting and certain forms of encryption. Those opposed to the proposal question the need for a change, and also point out the costs of adjusting to the proposed change and its inconvenience to amateur astronomers and others who rely upon astronomical calculations published in advance. Reports have been circulated that the cost of checking and correcting software to accommodate the new definition of UTC would be many millions of dollars for some systems. In October 2005 American Astronomical Society asked the ITU for a year's time to study the issue. This commission has

  17. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  18. National Capital Planning Commission Meeting Transcripts

    Data.gov (United States)

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  19. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  20. Commission Conditions d'emploi

    CERN Multimedia

    Staff Association

    2017-01-01

    Au CERN, nous avons la formidable possibilité d’imaginer nos CONDITIONS D’EMPLOIS. Rendez-vous compte ! Nous avons le pouvoir de proposer des idées et de les défendre pour avoir des conditions d’emplois qui soient les plus attractives possibles pour le personnel en place et à venir. ---------------- L’Association du personnel du CERN, tout le monde connait ou en a entendu parler. Ce qui est moins connu, ce sont les diverses commissions internes qui traitent des sujets propres à défendre les intérêts du personnel. Les publications dans notre journal, l’Echo, sont un des moyens à notre disposition pour vous faire découvrir chacune des commissions internes de l’Association du personnel (voir Echo n°242 sur la commission juridique, et Echo n°255 sur la commission des cas particuliers). Commission Conditions d&...

  1. National Bioethics Commissions as Educators.

    Science.gov (United States)

    Lee, Lisa M

    2017-05-01

    As has become tradition, executive directors of United States' presidential bioethics committees offer reflections about their experience shortly after the orderly shutdown of the commission staff. After the records are filed according to government records regulations; after all the staff members, who are hired into temporary positions that must be renewed every two years, have secured permanent employment; after preparations are made to ensure that the next commission staff (should there be one) has a budget and standard operating procedures in order to begin its work in a timely manner; after the lights are turned out for the last time, the executive director makes the final climb up the stairs into the sunlight and reflects on the whirlwind. There is much about my work with the Presidential Commission for the Study of Bioethical Issues that deserves comment, but one aspect of the commission that has been especially valuable to me is its work to educate the nation on bioethical issues. This is, moreover, a contribution in which the commission staff was central, and it is one that, as an ethics educator myself, I will cherish deeply. © 2017 The Hastings Center.

  2. Water

    Science.gov (United States)

    ... www.girlshealth.gov/ Home Nutrition Nutrition basics Water Water Did you know that water makes up more ... to drink more water Other drinks How much water do you need? top Water is very important, ...

  3. Commissioning of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(CDS)2069446

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focusing on simultaneous running and combined track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  4. Surrogacy commissioning fathers and HIV

    OpenAIRE

    Jordaan, D W

    2014-01-01

    Surrogacy is not regulated by a single legal instrument only, nor is confirmation of a surrogacy agreement by the High Court an unqualified green light for the surrogacy process to proceed. In the context of the HIV status of the commissioning father, whose gametes are to be used for the conception of the child in pursuance of a surrogacy agreement, the intended in vitro fertilisation of the surrogate mother may only take place on condition that the commissioning father, and his semen, have b...

  5. 47 CFR 1.1528 - Commission review.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission review. 1.1528 Section 1.1528... Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on its own initiative, in...

  6. LHC Commissioning and First Operation

    OpenAIRE

    Myers, S

    2010-01-01

    A description is given of the repair of the LHC after the accident of September 2008. The LHC hardware and beam commissioning and initial operation are reviewed both in terms of beam and hardware performance. The implemented machine protection measures and their impact on LHC operation are presented.

  7. Commissioning Leibstadt nuclear power plant

    International Nuclear Information System (INIS)

    Roeder, A.; Degen, R.; Nedelko, U.

    1985-01-01

    This paper describes the experience and benefits obtained from the use of temporary oil fired boilers of sufficient capacity to allow commissioning and no-load tests to be carried out on the turbine-generator months ahead of steam being available from the NSSS. The successful result at Leibstadt may be a model for other plants

  8. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The commissioning effort is presently addressing two main areas: the commissioning of the hardware components at the pit and the coordination of the activities of the newly constituted Detector Performance groups (DPGs). At point 5, a plan regarding the service cavern and the commissioning of the connections of the off-detector electronics (for the data collection line and trigger primitive generation) to the central DAQ and the central Trigger has been defined. This activity was started early February and will continue until May. It began with Tracker electronics followed so far by HCAL and CSC. The goal is to have by May every detector commission, as much as possible, their data transfer paths from FED to Central DAQ as well as their trigger setups between TPGs and Global Level 1 trigger. The next focus is on connections of front-ends to the service cavern. This depends strongly on the installations of services. Presently the only detector which has its link fibers connected to the off-detector electr...

  9. LHC: Construction and Commissioning Status

    CERN Document Server

    Evans, Lyndon R

    2007-01-01

    The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.

  10. Guidance on future art commissioning.

    Science.gov (United States)

    2009-05-01

    Delegates at Building Better Healthcare's recent "National Patient Environment and the Arts Conference 2009" in London heard how national public arts think tank ixia has appointed Bristol-based arts and wellbeing development agency Willis Newson to write "concise and convincing guidance" on commissioning art for new healthcare facilities. A key message, during a joint presentation, was that integrating artwork into hospitals and other healthcare premises requires the earliest possible consideration to reap the maximum rewards.

  11. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    The major progress made during the last months has been in the consolidation of services for the +endcaps and three barrel wheels (YB+2, YB+1 and YB0): all subdetectors have now final power connections (including Detector Safety protection), the gas systems have been commissioned for all gas detectors (the recirculation is not yet activated for the RPC though) and detector cooling has also been commissioned. Their integration with final services is the necessary condition for being able to operate larger fractions the detector. Recent weeks have seen full HCAL, more than 50% of EB and full wheels of DTs and CSC being operated using final services. This has not yet translated into major progress of global integration due to major interruptions of central services, which have not allowed the necessary debugging and commissioning time to all the subdetec¬tors and central activities like DAQ and trigger. Moreover the running in of the final central services has introduced instabilities related to the co...

  12. Report of the disarmament commission

    International Nuclear Information System (INIS)

    1991-07-01

    At its forty-fifth session, the General Assembly adopted resolution 45/62 B of 4 December 1990, entitled ''Report of the Disarmament Commission'', by which the Assembly, inter alia: notes that no consensus could be reached on specific recommendations for the item regarding various aspects of the arms race, particularly the nuclear-arms race and nuclear disarmament, as well as a general approach to negotiations on nuclear and conventional disarmament; Working Group II on agenda item 5 of the United Nations Disarmament Commission, entitled ''Process of nuclear disarmament in the framework of international peace and security, with the objective of the elimination of nuclear weapons'', held 11 meetings during the 1991 substantive session of the Disarmament Commission which were preceded by a number of rounds of informal consultations conducted by the Chairman. A structure of work which would serve as a guideline for the work of the Group, while at the same time maintaining the general nature of the desired approach was agreed to by the Group; it included the following four items: 1. The relationship between the process of nuclear disarmament and international peace and security; 2. Review of the steps taken in the process of nuclear disarmament; 3. Strengthening the process of nuclear disarmament, necessary conditions, and mechanisms required for it; 4. The role of the United Nations system in the process of nuclear disarmament with the objective of the elimination of nuclear weapons

  13. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    P5 Commissioning activities The commissioning effort at the pit has made major progress since the last CMS week concerning the installation and operation of the off-detector electronics in USC. The progress has been much slower in the experi¬mental cavern due to the delay in the deployment of the infrastructure which should eventually allow safe powering-up of the front ends. Nevertheless, temporary power connections have allowed operation of slices of subdetectors at any given time. HF, HE, ECAL, DTs, RPCs and CSCs have carried out local commissioning tests with these temporary services. The status of hardware deployment in USC and on the towers/balconies is represented in the detailed table below.   Table 1: Status of installation of off-detector electronics. FEDs are detector dependent hardware modules which perform the first ‘colla¬tion’ of front-end data and send it to Central-data for event building. Tracker, ECAL, HCAL have their front end electronics mo...

  14. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The global commissioning campaign begins this year with a series of weekly two-day global runs of limited participation until mid-March. The aim of these runs varies week-to-week, but includes the commissioning the calorimeter triggers, the muon track-finder triggers in the DT/CSC overlap, the PLL locking ranges, and generally accumulating data either for HCAL noise characterization or detector studies with cosmic muons. In mid-March a full Global Run is scheduled with all components participating, followed in April by a Cosmic Run with the aim of collecting statistics over a couple weeks with the installed Tracker and other subsystems. The ultimate milestone is the Cosmic Run At Four Tesla (CRAFT), with a completed CMS closed and the solenoid energized for data-taking during June. The Detector Performance Groups start the year with the focus to prepare for LHC collisions, and the associated challenges (CSA08) and global commissioning exercises (CRAFT) along the way. New this year is the addition of the Tri...

  15. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  16. Alaska Public Offices Commission, Department of Administration, State of

    Science.gov (United States)

    Visiting Alaska State Employees State of Alaska Department of Administration Alaska Public Offices Commission Alaska Department of Administration, Alaska Public Offices Commission APOC Home Commission Filer ; AO's Contact Us Administration > Alaska Public Offices Commission Alaska Public Offices Commission

  17. National Capital Planning Commission Library contents

    Data.gov (United States)

    National Capital Planning Commission — The National Capital Planning Commission library catalog is a compilation of titles, authors, years of publication and topics of books, reports and NCPC publications.

  18. Powers and Duties of Corporate Affairs Commission

    African Journals Online (AJOL)

    Mofasony

    POWERS AND DUTIES OF THE CORPORATE AFFAIRS. COMMISSION ... The Registrar-General is the Chief Executive of the Commission and is saddled .... Federal Board of Inland Revenue Department of the Ministry of Finance v). Register ...

  19. Atomic Energy Commission Act, 2000 (Act 588)

    International Nuclear Information System (INIS)

    2000-01-01

    Act 588 of the Republic of Ghana entitled, Atomic Energy Commission Act, 2000, amends and consolidates the Atomic Energy Commission Act, 204 of 1963 relating to the establishment of the Atomic Energy Commission. Act 588 makes provision for the Ghana Atomic Energy Commission to establish more institutes for the purpose of research in furtherance of its functions and also promote the commercialization of its research and development results. (E.A.A.)

  20. Bioethics commission to review gene patenting

    Energy Technology Data Exchange (ETDEWEB)

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  1. The Industry Commission inquiry into charitable organisations.

    Science.gov (United States)

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  2. Atomic Energy Commission (Amendment) Law, 1993

    International Nuclear Information System (INIS)

    1993-02-01

    The Atomic Energy Commission (Amendment) Law, 1993 (P.N.D.C.L. 308) seeks to amend the Atomic Energy Commission Act of 1963 (Act 204) so as to provide for the establishment of a Radiation Protection Board and other institutes under the Ghana Atomic Energy Commission. The Law further repeats the Atomic Energy Commission (Amendment) Law of 1982 (P.N.D.C.L. 37). (EAA)

  3. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  4. Commissioning Instrument for the GTC

    Science.gov (United States)

    Cuevas, S.; Sánchez, B.; Bringas, V.; Espejo, C.; Flores, R.; Chapa, O.; Lara, G.; Chavolla, A.; Anguiano, G.; Arciniega, S.; Dorantes, A.; González, J. L.; Montoya, J. M.; Toral, R.; Hernández, H.; Nava, R.; Devaney, N.; Castro, J.; Cavaller-Marqués, L.

    2005-12-01

    During the GTC integration phase, the Commissioning Instrument (CI) will be a diagnostic tool for performance verification. The CI features four operation modes: imaging, pupil imaging, Curvature WFS, and high resolution Shack-Hartmann WFS. This instrument was built by the Instituto de Astronomía UNAM and the Centro de Ingeniería y Desarrollo Industrial (CIDESI) under GRANTECAN contract after a public bid. In this paper we made a general instrument overview and we show some of the performance final results obtained when the Factory Acceptance tests previous to its transport to La Palma.

  5. 17 CFR 201.57 - Commission review.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review. 201.57... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the... Division of the Commission may seek review of the initial decision on the fee application, or the...

  6. Report for fiscal 1994 on commissioned operation for research cooperation related to simplified purification system for industrial waste water; 1994 nendo sangyo haisui nado no kan'i joka system ni kansuru kenkyu kyoryoku hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    With an objective to serve for environmental preservation in developing countries, joint researches have been performed on anaerobic waste water treatment systems utilizing bio-technology. This paper summarizes the achievements in fiscal 1994. In the research cooperation with Thailand, a reactor applicability test was performed by using a pilot plant to determine the operating conditions, and necessary data were obtained. The pilot plant was completed of installation in November. In the research cooperation with Indonesia, Tofu manufacturing waste water was selected as the object of pilot plant research. In the detailed design the Tofu manufacturing waste water shall be treated anaerobically, and the kitchen waste water shall be treated aerobically to acquire the intended water quality. In the research cooperation with Malaysia, as a result of visiting six industries and 22 factories for investigation, waste waters from chemical and foodstuff factories were selected as the object waste waters for the research. Three researchers from Thailand and Indonesia respectively were received in Japan to provide education including experimental training and visits to waste water treatment facilities. (NEDO)

  7. Report for fiscal 1994 on commissioned operation for research cooperation related to simplified purification system for industrial waste water; 1994 nendo sangyo haisui nado no kan'i joka system ni kansuru kenkyu kyoryoku hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    With an objective to serve for environmental preservation in developing countries, joint researches have been performed on anaerobic waste water treatment systems utilizing bio-technology. This paper summarizes the achievements in fiscal 1994. In the research cooperation with Thailand, a reactor applicability test was performed by using a pilot plant to determine the operating conditions, and necessary data were obtained. The pilot plant was completed of installation in November. In the research cooperation with Indonesia, Tofu manufacturing waste water was selected as the object of pilot plant research. In the detailed design the Tofu manufacturing waste water shall be treated anaerobically, and the kitchen waste water shall be treated aerobically to acquire the intended water quality. In the research cooperation with Malaysia, as a result of visiting six industries and 22 factories for investigation, waste waters from chemical and foodstuff factories were selected as the object waste waters for the research. Three researchers from Thailand and Indonesia respectively were received in Japan to provide education including experimental training and visits to waste water treatment facilities. (NEDO)

  8. Commissioning of the CEBAF cryomodules

    International Nuclear Information System (INIS)

    Drury, M.; Lee, T.; Marshall, J.; Preble, J.; Saulter, Q.; Schneider, W.; Spata, M.; Wiseman, M.

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, over half of the cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz. A cryomodule must provide an energy gain of 20 MeV to the 200 μA beam. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's of the cavity ports, the unloaded Q (Q 0 ) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity. The sensitivity of the resonant frequency to changes in pressure and gradient is also measured. Finally, the mechanical tuners are cycled and characterized. In all cases, the performance of CEBAF cryomodules has exceeded the design requirements. A portable test stand allows local control of the rf system and provides automated data acquisition. This paper describes the cryomodule commissioning hardware, software, and measurements

  9. Molr - A delegation framework for accelerator commissioning

    CERN Document Server

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  10. SERPUKHOV: UNK transfer beamline commissioned

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    At the end of the 1000 hour February-March run of the 70 GeV proton synchrotron at the Institute for High Energy Physics (IHEP), Serpukhov, near Moscow, the new 2.7-kilometre UNK Beam Transfer Line (BTL) was commissioned with proton beam. BTL will eventually transfer beam from the existing U70 proton accelerator to the first stage of the UNK (UNK-1, now under construction) where it will be accelerated in the 21- kilometre ring up to 600 GeV. BTL was designed for proton energies between 60 and 70 GeV, momentum spread ± 2 x 10 -3 and beam emittance 2 mm.mrad, with systems for fast ejection, beam transfer and injection into UNK-1

  11. Commissioning and operation of DRAGON

    International Nuclear Information System (INIS)

    Engel, Sabine

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the 21 Na(p,γ) 22 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of ±20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented

  12. Commissioning and operation of DRAGON

    CERN Document Server

    Engel, S

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the sup 2 sup 1 Na(p,gamma) sup 2 sup 2 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of +-20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented.

  13. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    T. Camporesi

    The central commissioning activities have concentrated mostly in the Service cavern. Since early February the central DAQ has been ready to accept connections from FEDs from the various partitions. This has triggered a campaign from all subdetectors to install their readout crates in USC55. Systematic tests of the connections between FEDs and Central DAQ have been scheduled and to date more than 70% of all FED connections have been successfully tested from almost all subdetectors. In March the Level 1 trigger team started deployment of their hardware followed by a campaign of testing the connections between Trigger primitive generators and the corresponding LV1 hardware (Regional Calorimeter Trigger and Global Muon Trigger). The functionality tests are continuing to date by pattern tests of increasing complexity. In April the central DAQ was ready to start FED system tests, which amounts to testing the data reading and trans¬fer-ability from the FEDs to the Filter Units (with or without an actual ...

  14. Division A Commission 31: Time

    Science.gov (United States)

    Hosokawa, Mizuhiko; Arias, Elisa Felicitas; Manchester, Richard; Tuckey, Philip; Matsakis, Demetrios; Zhang, Shougang; Zharov, Vladimir

    2016-04-01

    Time is an essential element of fundamental astronomy. In recent years there have been many time-related issues, in scientific and technological aspects as well as in conventions and definitions. At the Commission 31 (Time) business meeting at the XXIX General Assembly, recent progress and many topics, including Pulsar Time Scales WG and Future UTC WG activities, were reviewed and discussed. In this report, we will review the progress of these topics in the past three years. There are many remarkable topics, such as Time scales, Atomic clock development, Time transfer, Future UTC and future redefinition of the second. Among them, scientific highlights are the progress of pulsar time scales and the optical frequency standards. On the other hand, as the social convention, change in the definition of UTC and the second is important.

  15. Water

    Science.gov (United States)

    ... drink and water in food (like fruits and vegetables). 6. Of all the earth’s water, how much is ocean or seas? 97 percent of the earth’s water is ocean or seas. 7. How much of the world’s water is frozen? Of all the water on earth, about 2 percent is frozen. 8. How much ...

  16. Ohio Lake Erie Commission Homepage

    Science.gov (United States)

    management of Lake Erie: including, water quality protection, fisheries management, wetlands restoration over 365 projects since 1993. Projects have focused on an array of issues critical to the effective quality of its waters and ecosystem, and to promote economic development of the region by ensuring the

  17. Report for fiscal 1998 on commissioned operation for research cooperation related to simplified purification system for industrial waste water; 1998 nendo sangyo haisui nado no kan'i joka system ni kansuru kenkyu kyoryoku hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    With an objective to serve for environmental preservation in developing countries, joint researches have been performed on anaerobic waste water treatment systems utilizing bio-technology. This paper summarizes the achievements in fiscal 1998. This fiscal year has performed the bench scale test and the operation research of an anaerobic waste water treatment pilot plant jointly with the Standards and Industrial Research Institute in Malaysia on waste waters from the vegetable fat and oil chemical industry. In the bench scale test, data were collected on the oil removing effect of the pressurization and flotation treatment, and the characteristics of the anaerobic treatment. Operation research was performed in the pilot plant by using the anaerobic waste water treatment plant and the aerobic treatment facility. In addition, a feasibility study was carried out to evaluate an optimal treatment system. Furthermore, three researchers were received from Malaysia to whom lectures were given on the Japanese anaerobic treatment technologies, and visits and operation training on the waste water treatment facilities. (NEDO)

  18. Options and Consequences: Water Banking/Leasing Issues Explored for the Rio Grande in Southern New Mexico

    Science.gov (United States)

    Brookshire, D. S.; Coursey, D.; Dimint, A.; Tidwell, V.

    2004-12-01

    Since 1950, the demand for water has more than doubled in the United States. Historically, growing demands have been met by increasing reservoir capacity and through groundwater mining, often at the expense of environmental and cultural concerns. The future is expected to hold much the same. Demand for water will continue to increase particularly in response to the expanding urban sector, while growing concerns over the environment are prompting interest in allocating more water for in-stream uses. So, where will this water come from? Virtually all water supplies are allocated. Providing for new uses requires a reduction in the amount of water dedicated to existing uses. The water banking/leasing model is formulated within a system dynamics context using the object oriented commercial software package, Powersimä Studio 2003. System dynamics provides a unique mathematical framework for integrating the natural and social processes important to managing natural resources and can provide an interactive interface for engaging the public in the decision process. These system level models focus on capturing the broad structure of the system, specifically the feedback and time delays between interacting subsystems. The spatially aggregated models are computationally efficient allowing simulations to be conducted on a PC in a matter of seconds to minutes. By employing interactive interfaces, these models can be taken directly to the public or decision maker. To demonstrate the water banking/leasing model, application has been made to potential markets on the Rio Grande. Specifically, the model spans the reach between Elephant Butte Reservoir (central New Mexico) and the New Mexico/Texas state line. Primary sectors in the model include climate, surface and groundwater, riparian and aquatic habitat, watershed processes, water quality, water demand (residential, commercial, industrial, institution, and agricultural), economics, policy, and legal institutions. Within the model

  19. Water

    International Nuclear Information System (INIS)

    Chovanec, A.; Grath, J.; Kralik, M.; Vogel, W.

    2002-01-01

    An up-date overview of the situation of the Austrian waters is given by analyzing the status of the water quality (groundwater, surface waters) and water protection measures. Maps containing information of nitrate and atrazine in groundwaters (analyses at monitoring stations), nitrate contents and biological water quality of running waters are included. Finally, pollutants (nitrate, orthophosphate, ammonium, nitrite, atrazine etc.) trends in annual mean values and median values for the whole country for the years 1992-1999 are presented in tables. Figs. 5. (nevyjel)

  20. The Commissioning of the LHC Technical Systems

    CERN Document Server

    Saban, R; Baggiolini, V; Ballarino, A; Barbero-Soto, E; Bellesia, B; Bordry, Frederick; Bozzini, D; Casas-Lino, M-P; Chareyre, V; Claudet, S; Coelingh, G-J; Dahlerup-Petersen, K; Denz, R; Fehér, S; Flora, R; Gruwé, M; Kain, V; Kirby, G; Koratzinos, M; Lauckner, R; Le Naour, S; Mess, K-H; Millet, F; Montabonnet, V; Nisbet, D; Perea-Solano, B; Pojer, M; Principe, R; Rabehl, R; Rijllart, A; Redaelli, S; Rodríguez-Mateos, F; Schmidt, R; Serio, L; Siemko, A; Solfaroli-Camillocci, M; Thiesen, H; Venturini, W; Vergara-Fernandez, A; Verweij, A; Zerlauth, M

    2007-01-01

    The LHC is an accelerator with unprecedented complexity where the energy stored in magnets and the beams exceeds other accelerators by one-to-two orders of magnitude. To ensure a safe and efficient machine start-up without being plagued by technical problems, a phase of "hardware commissioning" was introduced: a thorough commissioning of technical systems without beam. This activity started in June 2005 with the commissioning of individual systems, followed by operating a full sector, one eighth of the machine; the commissioning is expected to last until spring 2008 when commissioning with beam will start. The LHC architecture allows the commissioning of each of the eight sectors independently from the others, before the installation of other sectors is complete. An important effort went into the definition of the programme and the organization of the coordination in the field, as well as in the preparation of the tools to record and analyze test results. This paper discusses the experience with this approach...

  1. Water

    Science.gov (United States)

    ... can be found in some metal water taps, interior water pipes, or pipes connecting a house to ... reduce or eliminate lead. See resources below. 5. Children and pregnant women are especially vulnerable to the ...

  2. Israel Atomic Energy Commission 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    , hardness and residual thermal stress. Although this work is of a more basic nature, its applications are already in sight. The third report describes the utilization of passive, dry-air cooling systems for major installations, such as cooling the containment of the Westinghouse AP-600 advanced pressurized water reactor. Good and economic passive dry-air cooling systems would be among the best solutions for containment cooling at inland sites, especially in arid areas. Noninvasive medical diagnostic methods utilizing radioactive materials have been standard far many years. The most common of these relies on using a gamma camera to determine the distribution of injected or ingested radioisotope-labeled compounds in the human body. The 30-year-old camera technology, although vastly improved over the years, is still handicapped by energy and spatial resolution limitations of the detectors, by the size and bulk of the instrument and other technical problems. The need for further development of an improved, more efficient and compact imaging system is clear. Such a system, based on solid-state detectors, is described in the last report. I would like to commend the authors of the selected presentations as well as the entire staff of the Israel Atomic Energy Commission for their valuable contributions and achievements and wish them all further success in their continuing fruitful endeavors.

  3. Nuclear Regulatory Commission issuances, October 1993

    International Nuclear Information System (INIS)

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners' motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners' have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission's Memorandum and Order are included

  4. Large Hadron Collider commissioning and first operation.

    Science.gov (United States)

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  5. A Staged Approach to LHC Commissioning

    CERN Document Server

    Lamont, M; Brüning, Oliver Sim; Collier, P; Lauckner, R; Schmidt, R

    2006-01-01

    Effective commissioning of the LHC with beam will demand very good preparation; all concerned subsystems will need to be well-prepared and thoroughly tested before first beam. To clarify the demands on the systems involved the objectives of the commissioning phases are presented, along with a breakdown of the phases and the essential prerequisites for each. The nature of the interdependencies between the various systems is highlighted; in particular the need for a well-planned commissioning of the machine protection system.

  6. Federal Energy Regulatory Commission (FERC) Regions

    Data.gov (United States)

    Department of Homeland Security — Federal Energy Regulatory Commission (FERC) Regions. FERC is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil....

  7. Real Estate Agent Commission Disputes

    Directory of Open Access Journals (Sweden)

    Anida Duarte

    2015-06-01

    Full Text Available The purpose of this study was to examine the relationship among Procuring Cause Law, real estate agent years of experience, and real estate commission disputes. A pilot survey was conducted in the southwestern United States among real estate agents, realtor(s, and brokers. After testing the hypothesis, the decision was made to fail to reject the hypothesis and conclude that real estate agent experience and not Procuring Cause Law produced favorable outcomes in disputes. As a result, the following recommendations were made: (a Agency seller and buyer’s agreements should be used in each transaction to avoid disputes, (b proper expectations and guidelines should be reviewed prior to starting any real estate transaction, (c a checklist may assist in the assurance that all valuable information is reviewed, (d agents could benefit from fully understanding Procuring Cause Law and sharing this information with their clients, (e state and national regulatory requirements of the law could be modified for easier understanding and use, and (f consumers who willfully violate the law could be subject to monetary penalties.

  8. Study of the radiological and chemical quality of sediments and water of the Loire river at the vicinity of the Belleville-sur-Loire CNPE. Study performed on the request of the Belleville-sur-Loire Local Information Commission

    International Nuclear Information System (INIS)

    Rougier, G.; Josset, M.; Bernollin, A.; Barbey, P.; Boilley, D.; Festoc, S.; Dunand, E.

    2017-01-01

    This study reports an assessment of the influence of present and previous releases of the Belleville-sur-Loire nuclear site, as well as of the persistence of other pollutions in the environment. The report first recalls authorised annual levels for liquid and gaseous radioactive releases and for chemical releases. It describes the strategy and method adopted to assess the radiological and chemical influence of the nuclear power plant on the environment: studied area, sampling locations and samples, examined radiological and chemical parameters. It indicates the adopted strategy and comments results obtained for radiological measurements in waters, in sediments, and in aquatic plants. Results are notably discussed in terms of natural and artificial radioactivity. Chemical measurements are then reported in the same way: strategy, measurements and discussion of results obtained in water and in sediments. Additional information on radionuclides and on sampling and analysis methodologies are given in appendix

  9. Expertise on the file of declaration of modifications related to releases and to water samplings of the Belleville-sur-Loire C.N.P.E. Study performed on the request of the Bellevile-sur-Loire Local Information Commission

    International Nuclear Information System (INIS)

    Migeon, A.; Barbey, P.; Guillemette, A.; Josset, M.

    2013-01-01

    After a recall of the regulatory framework regarding the safety of nuclear installations and transport of radioactive substances, this document reports an expertise study of the content of a file (Declaration of modification related to releases and water samplings of the Nuclear Centre of Electricity Production (CNPE) of Belleville-sur-Loire) which is being examined by concerned authorities. It first proposes some information on sources of hazard (others than radiological) such as pathogen agents (legionella, amoebae), dangerous chemical agents (hydrazine, morpholine, ethanol-amine, nitrites and nitrates, and so on). It more particularly analyses, comments, explains and discusses four issues of the request for change: evolution of the chemical conditioning of the primary circuit, implementation of a processing of condenser cooling circuits by massive chlorination under controlled pH, evolution of water sampling and release authorisations, and modification of regulatory texts. For these four issues, notably the first three ones, the authors provide detailed comments and discussion on technical and chemical issues. The fourth part of the report addresses the regulatory monitoring of the environment of the nuclear power plant: monitoring of chemical releases (in the Loire river, in its sediments, fauna and flora), of biological pathogen agents, of tritium in water and in the atmosphere. For these various issues, the authors propose a presentation of the situation, and give some explanations and comments on the measured and available data

  10. Innovative ultrasonics for power plant commissioning

    International Nuclear Information System (INIS)

    Murphy, R.V.; Alikhan, S.

    1983-05-01

    During the commissioning of a nuclear power plant, the usual role of ultrasonics is associated with nondestructive testing of welds. There is, however, a variety of undesirable conditions associated with the fluids carried through the various reactor systems which may be just as important to station operation. A variety of unusual ultrasonic techniques has been developed for testing fluid systems at the Point Lepreau Generating Station. This paper uses the experience gained at the Point Lepreau reactor to illustrate the valuable information which can be gained from these measurements, such as: fluid level in pipes and headers; fluid level in pressure vessels; detection, and sizing of debris in pipes; in situ measurement and verification of orifice condition; detection and location of cavitation, water hammer, valve leakage; quantitative measurement of gate movement within the body of an inservice valve; determination of valve position; detection and imaging of flow separation; detection and location of leaks in concrete containment structures; verification of design flows; balancing of loop flows; and detection of low flow. The application of these techniques at other reactor sites is also discussed

  11. Nuclear Regulatory Commission Issuances, August 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit No. 1), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Westinghouse Electric Corp. (Export of LEU to the Philippines); Issuances of Atomic Safety and Licensing Appeal Boards--Duke Power Company (Amendment to Materials License SNM-1773--Transportation of Spent Fuel from Oconee Nuclear Station for Storage at McGuire Nuclear Station); Issuances of the Atomic Safety Licensing Boards--Commonwealth Edison Company (Byron Station, Units 1 and 2), Dairyland Power Cooperative (La Crosse Boiling Water Reactor, Operating License and Show Cause), Florida Power and Light Company (St. Lucie Plant, Unit No. 2), Florida Power and Light Company (Turkey Point Nuclear Generating, Units 3 and 4), Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit 1) Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), The Regents of the University of California (UCLA Research Reactor), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3: Terminiation of Proceedings); Issuances of the Directors Denial--Florida Power and Light Company

  12. Pickering dry storage - commissioning and initial operation

    International Nuclear Information System (INIS)

    Jonjev, S.

    1996-01-01

    Having commissioned all individual conventional and nuclear systems, the first Dry Storage Container (DSC) was loaded with four modules of 17 year cooled irradiated fuel (366 bundles) in the Auxiliary Irradiated Fuel Bay (AIFB) on November 29, 1995. After decontamination of the outer surface, and draining of water, the DSC was transported to the Used Fuel Dry Storage Facility (UFDSF) workshop, where it was vacuum dried, and then the lid was welded on. Following successful radiography test of the lid weld, the DSC was vacuum dried again and backfilled with Helium to a pressure of 930 mbar(a). The Helium leak test showed zero leakage (allowable leak rate is 1x10 -5 cc/sec). Finally, after loose contamination checks were performed and permanent safeguards seals were applied, the DSC was placed in the UFDSF storage area on January 23, 1996. Radiation fields at contact with the DSC surface were < 0.6 mrem/hr, and at the exterior surface of the storage building wall only 33 micro-rem/hr (far below the target of 250 micro-rem/hr). Therefore, the actual dose rates to general public (at the exclusion zone boundary) will be well below the design target of 1 % of the regulatory limit. (author). 3 refs., 2 tabs., 5 figs

  13. Pickering dry storage - commissioning and initial operation

    Energy Technology Data Exchange (ETDEWEB)

    Jonjev, S [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1997-12-31

    Having commissioned all individual conventional and nuclear systems, the first Dry Storage Container (DSC) was loaded with four modules of 17 year cooled irradiated fuel (366 bundles) in the Auxiliary Irradiated Fuel Bay (AIFB) on November 29, 1995. After decontamination of the outer surface, and draining of water, the DSC was transported to the Used Fuel Dry Storage Facility (UFDSF) workshop, where it was vacuum dried, and then the lid was welded on. Following successful radiography test of the lid weld, the DSC was vacuum dried again and backfilled with Helium to a pressure of 930 mbar(a). The Helium leak test showed zero leakage (allowable leak rate is 1x10{sup -5} cc/sec). Finally, after loose contamination checks were performed and permanent safeguards seals were applied, the DSC was placed in the UFDSF storage area on January 23, 1996. Radiation fields at contact with the DSC surface were < 0.6 mrem/hr, and at the exterior surface of the storage building wall only 33 micro-rem/hr (far below the target of 250 micro-rem/hr). Therefore, the actual dose rates to general public (at the exclusion zone boundary) will be well below the design target of 1 % of the regulatory limit. (author). 3 refs., 2 tabs., 5 figs.

  14. Harnessing water power in the larger Hannover area. Study commissioned by the local administration union larger Hannover area; Nutzung der Wasserkraft im Grossraum Hannover. Eine Studie im Auftrag des Zweckverbandes Grossraum Hannover

    Energy Technology Data Exchange (ETDEWEB)

    Sahling, U [comp.

    1993-12-31

    Within the framework of an inventory of possible sites for hydroelectric power plants in the larger Hannover area, 60 sites in the rural district of Hannover were more closely investigated. 57 of these were former water mills and 3 were hydraulic structures that have nothing to do with former water mills. 29 water mills are to be considered as dismantled in hydraulic engineering terms, 8 are in operation, and 20 are decommissioned. Furthermore, 2 weirs and 1 barrage were included in the investigation.- In the area of the city of Hannover, there are four more sites of hydroelectric power plants, of which one is dismantled, two are decommissioned and one is in operation.- In order to complement the inventory, object expertises of different depths were prepared for eight selected sites. They permit a qualified assessment of the chances of reactivation of each site, taking the respective specific conditions into account. At the same time, they represent a first step towards detailed advice for a prospective operator (orig.). [Deutsch] Im Rahmen der Studie zur Bestandserhebung von moeglichen Standorten fuer Wasserkraftanlagen im Grossraum Hannover wurden 60 Standorte im Landkreis Hannover naeher untersucht. Es handelt sich um 57 ehemalige Wassermuehlen und 3 wasserbauliche Anlagen, die nichts mit ehemaligen Wassermuehlen zu tun haben. 29 Wassermuehlen sind im wasserbaulichen Sinn als beseitigt anzusehen, 8 sind in Betrieb, 20 liegen still. Darueberhinaus wurden 2 Wehre und 1 Stauanlage in die Untersuchungen einbezogen. Im Gebiet der Stadt Hannover befinden sich 4 weitere Wassrkraftstandorte, von denen einer als beseitigt anzusehen ist, zwei stilliegen und einer in Betrieb ist. Ergaenzend zu der Bestandserhebung wurden fuer acht ausgewaehlte Standorte Objektgutachten unterschiedlicher Bearbeitungstiefe erstellt. Sie ermoeglichen eine qualifizierte Beurteilung der Reaktivierungschancen unter Beruecksichtigung der jeweiligen standortspezifischen Besonderheiten

  15. 77 FR 67637 - Equity and Excellence Commission

    Science.gov (United States)

    2012-11-13

    ... notice also describes the functions of the Commission. Notice of this meeting is required by section 10(a.... ADDRESSES: The Commission will meet in Washington, DC at the National Museum of the American Indian at... Lounge of the museum on November 27 and in the museum's fourth-floor conference room on November 28. FOR...

  16. Commissioning quality assurance at Pickering NGS

    International Nuclear Information System (INIS)

    Wieckowski, J.T.

    1983-05-01

    Ontario Hydro decided in 1978 to implement a formal quality assurance program applicable to commissioning and operation of nuclear generating stations. Pickering NGS is the first station to have the commissioning quality assurance (CQA) program applied to it. This paper outlines the scope, implementation, and evaluation of the CQA program as applied to Pickering Unit 5

  17. 76 FR 4369 - Special Law Enforcement Commissions

    Science.gov (United States)

    2011-01-25

    ...This notice announces the online publication of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the Office of Justice Services following passage of the Tribal Law and Order Act of 2010. The documents are published on the Indian Affairs Web site.

  18. Ghana Atomic Energy Commission: Annual Report 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute.

  19. The Lancet Commission on Syria | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The journal has adopted a series of global commissions that convene groups of experts for a limited time to produce thematic work aimed at improving human lives through scientific review and inquiry, and to encourage accountability for the problem under study. The Commission on Syria marks the first time a Southern ...

  20. Ghana Atomic Energy Commission: Annual Report 2001

    International Nuclear Information System (INIS)

    2002-01-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute

  1. Niger Delta Development Commission and Sustainable ...

    African Journals Online (AJOL)

    Niger Delta Development Commission and Sustainable Development of Niger Delta Region of Nigeria: The Case of Rivers State. Goddey Wilson. Abstract. The study is on Niger Delta Development Commission and sustainable development of Niger Delta region of Nigeria, the case of Rivers State. The main objective of the ...

  2. Commissioning MMS: Challenges and Lessons Learned

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  3. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  4. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  5. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    Tiziano Camporesi

    Pit commissioning activities The last 4 months have seen various major achievements in hardware commissioning, global data taking, readiness of the DPGs to deal with LHC data flows and alignment and calibration workflows. Since February, the global commissioning has been characterized on the one side by more and more of the final CMS detector becoming available for global readout and triggering and on the other side by consolidation of many of the central software infrastructure and of most of the services infrastructure. The reliability of services like cooling, power, gas has markedly improved with respect to what we observed in the second half of 2007.   Of particular note are the delivery of all low voltage power supplies, the commissioning of the final power distribution, the progressive commissioning ( still ongoing)  of the Detector Safety System and of the associated DCS early warning and alarm system. On the detector side, while already we are used to seeing all of HCAL being exe...

  6. 76 FR 16285 - Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Update Water...

    Science.gov (United States)

    2011-03-23

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Update Water Quality Criteria for Toxic Pollutants in the Delaware... or ``Commission'') approved amendments to its Water Quality Regulations, Water Code and Comprehensive...

  7. Safety evaluation report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission for U.S. Energy Research and Development Administration Light Water Breeder Reactor. Special project No. 561

    International Nuclear Information System (INIS)

    1976-07-01

    The Safety Evaluation Report is presented for the Light Water Breeder Reactor (LWBR). The LWBR core is to be installed in the Shippingport reactor at the Shippingport Atomic Power Station. The Safety Evaluation Report is the result of an NRC staff review of the LWBR Safety Analysis Report submitted by the Division of Naval Reactors, U. S. Energy Research and Development Administration. As a result of its review, the NRC staff has recommended that: (1) a diverse trip signal, such as containment high pressure, be included in a 2-out-of-3 logic for initiation of safety injection; (2) power be locked out from the pressurizer surge isolation valve during normal operation; and (3) a chlorine monitor be installed in the main control room

  8. Water

    CSIR Research Space (South Africa)

    Van Wyk, Llewellyn V

    2010-08-01

    Full Text Available Water scarcity is without a doubt on of the greatest threats to the human species and has all the potential to destabilise world peace. Falling water tables are a new phenomenon. Up until the development of steam and electric motors, deep groudwater...

  9. Water

    OpenAIRE

    Hertie School of Governance

    2010-01-01

    All human life depends on water and air. The sustainable management of both is a major challenge for today's public policy makers. This issue of Schlossplatz³ taps the streams and flows of the current debate on the right water governance.

  10. Israel Atomic Energy Commission 1996 Annual Report

    International Nuclear Information System (INIS)

    1996-01-01

    , hardness and residual thermal stress. Although this work is of a more basic nature, its applications are already in sight. The third report describes the utilization of passive, dry-air cooling systems for major installations, such as cooling the containment of the Westinghouse AP-600 advanced pressurized water reactor. Good and economic passive dry-air cooling systems would be among the best solutions for containment cooling at inland sites, especially in arid areas. Noninvasive medical diagnostic methods utilizing radioactive materials have been standard far many years. The most common of these relies on using a gamma camera to determine the distribution of injected or ingested radioisotope-labeled compounds in the human body. The 30-year-old camera technology, although vastly improved over the years, is still handicapped by energy and spatial resolution limitations of the detectors, by the size and bulk of the instrument and other technical problems. The need for further development of an improved, more efficient and compact imaging system is clear. Such a system, based on solid-state detectors, is described in the last report. I would like to commend the authors of the selected presentations as well as the entire staff of the Israel Atomic Energy Commission for their valuable contributions and achievements and wish them all further success in their continuing fruitful endeavors

  11. Chemistry control approach of pre commissioning and power operation of primary and auxiliary system of KGS-3 and 4 and trouble shooting made

    International Nuclear Information System (INIS)

    Bennet Raj, N.; Sahu, B.S.; Kumar, Vineet; Valluri, J.

    2008-01-01

    KGS (Kaiga Generating Station) 3 and 4 is a 220 MWe pressurized heavy water reactor (PHWR) using heavy water (D 2 O) as moderator and primary heat coolant and the secondary system is light water which is used to make the steam for generating the power. The chemistry control approach made for the successful commissioning and subsequent power operation of the unit is discussed here. The chemistry control is of two parts first part covers the pre commissioning chemistry control and the second part covers the commissioning chemistry control. During commissioning all systems were preserved by proper chemistry control and regular recirculation of system to avoid stagnancy. The major pre commissioning and commissioning chemistry control are depicted below: Pre commissioning chemistry control of primary heat transport (PHT) system and auxiliaries; Pre commissioning chemistry control of moderator system; Primary heat transport system hot conditioning with light water; Commissioning chemistry control of End Shield System (ESC) and Calandria Vault Cooling (CVC) system; Heavy water addition and its chemistry control in moderator system; and Heavy water addition and its chemistry control in PHT system. During power operation dew point in annular gas monitoring system (AGMS) of KGS unit 3 was maintaining in higher side under recirculation. The increase of dew point could be due to ingress of heavy water or light water. A new device was developed to collect condensate and the chemistry of the condensate was checked. The result indicated the ingress of light water. (author)

  12. Nuclear Regulatory Commission issuances: Volume 39, Number 6

    International Nuclear Information System (INIS)

    1994-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). Issuances of the Nuclear Regulatory Commission include: (1) Advanced Medical Systems, Inc.; (2) Henry Allen, Diane Marrone, and Susan Settino; and (3) Westinghouse Electric Corporation. Issuances of the Atomic Safety and Licensing Boards include: (1) Sequoyah Fuels Corporation and General Atomics Corporation and (2) Umetco Minerals Corporation. Issuances of Director's Decisions include: (1) Advanced Medical Systems, Inc., and (2) Boston Edison Company and all boiling water reactors. The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  13. Instrumented home energy rating and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  14. The Kemeny commission report. Comments by UKAEA

    International Nuclear Information System (INIS)

    1979-01-01

    The report of the President's Commission - the Kemeny Report - on the accident at Three Mile island has been considered by the UKAEA and the implications of the Commission's findings and recommendations for the United Kingdom examined. The contents of the report have been studied not only generally but also for each site and especially with respect to plant instrumentation, operator training, emergency arrangements and communications. The Authority believes that there are no major deficiencies but is fully aware of the crucial importance of continuing to exercise all possible care and ensuring that each detailed point arising from the Kemeny Commission's Report is given careful thought. (U.K.)

  15. Commissioning quality assurance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig.

  16. Commissioning quality assurance for nuclear power plants

    International Nuclear Information System (INIS)

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig

  17. Official communication of the Safety Commission

    CERN Multimedia

    DG Unit

    2009-01-01

    The Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of 2 April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  18. Official communication of the Safety Commission

    CERN Multimedia

    DG Unit

    2009-01-01

    We, the Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of the 2nd April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  19. Nuclear Regulatory Commission: more aggressive leadership needed

    International Nuclear Information System (INIS)

    Staats, E.B.

    1980-01-01

    The Energy Reorganization Act of 1974 which established the Nuclear Regulatory Commission required GAO to evaluate the Commission's performance by January 18, 1980. This report responds to that requirement. GAO concluded that, although improvements have been made, the Commission's nuclear regulatory performance can be characterized best as slow, indecisive, cautious - in a word, complacent. This has largely resulted from a lack of aggressive leadership as evidenced by the Commissioners' failure to establish regulatory goals, control policymaking, and most importantly, clearly define their roles in nuclear regulation

  20. Permanent Commission for Health and Safety

    CERN Multimedia

    Association du personnel

    2007-01-01

    The mandate of the Staff Association's permanent commission for Health and Safety is to examine all aspects of health and safety related to the working environment at CERN. In no way does it wish to be a substitute for the official bodies that are responsible for these matters. The Commission's aim is to formulate remarks on and make proposals about these questions to the relevant bodies and the CERN Management. Its main focus is the safety of the CERN staff but it is also concerned with the safety of the installations and of the CERN environment. The Commission reports to the Staff Council and the Executive Committee of the Staff Association.

  1. Water

    Directory of Open Access Journals (Sweden)

    E. Sanmuga Priya

    2017-05-01

    Full Text Available Phytoremediation through aquatic macrophytes treatment system (AMATS for the removal of pollutants and contaminants from various natural sources is a well established environmental protection technique. Water hyacinth (Eichhornia crassipes, a worst invasive aquatic weed has been utilised for various research activities over the last few decades. The biosorption capacity of the water hyacinth in minimising various contaminants present in the industrial wastewater is well studied. The present review quotes the literatures related to the biosorption capacity of the water hyacinth in reducing the concentration of dyestuffs, heavy metals and minimising certain other physiochemical parameters like TSS (total suspended solids, TDS (total dissolved solids, COD (chemical oxygen demand and BOD (biological oxygen demand in textile wastewater. Sorption kinetics through various models, factors influencing the biosorption capacity, and role of physical and chemical modifications in the water hyacinth are also discussed.

  2. Commissioning of closed loop controls at CPP, HWP, Manuguru (Paper No. 3.5)

    International Nuclear Information System (INIS)

    Basu, Sukumar; Narasimham, P.L.

    1992-01-01

    The captive power plant (CPP) for Heavy Water Plant, Manuguru is equipped with 3x265 T/hr steam capacity boilers. The control system is built around ASEA master hardware for sequence interlocks, closed loop control, and data acquisition functions. This paper describes the configuration of the system hardware, the steps carried out during commissioning of closed loop controls in distributed digital control systems and also the problems faced during the commissioning of closed loops. (author). 3 figs

  3. 18 CFR 376.204 - Delegation of Commission's authority during emergency conditions.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Delegation of Commission's authority during emergency conditions. 376.204 Section 376.204 Conservation of Power and Water... Director; (ii) Director of the Office of Energy Market Regulation; (iii) Director of the Office of Energy...

  4. 33 CFR 207.10 - Charles River, Mass.; dam of Charles River Basin Commission.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Charles River, Mass.; dam of Charles River Basin Commission. 207.10 Section 207.10 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.10 Charles River, Mass.; dam of...

  5. Nuclear Regulatory Commission Issuances, May 81

    International Nuclear Information System (INIS)

    1981-05-01

    Contents: Issuances of the Nuclear Regulatory Commission--Consolidated Edison Company of New York, Inc. (Indian Point, Unit No. 2), Power Authority of the State of New York (Indian Point, No. 3 Nuclear Power Plant), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Statement of Policy on Conduct of Licensing Proceedings, Uranium Mill Licensing Requirements; Issuances of Atomic Safety and Licensing Appeal Boards--Houston Lighting and Power Company, et al. (South Texas Project, Units 1 and 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit No. 2), Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc. (Susquehanna Steam Electric Station, Units 1 and 2), Philadelphia Electric Company et al. (Peach Bottom Atomic Power Station, Units 2 and 3), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2); Issuances of the Atomic Safety and Licensing Boards--Duke Power Company (William B. McGuire Nuclear Station, Units 1 and 2), Florida Light and Power Company (Turkey Point Nuclear Generating, Units 3 and 4), Illinois Power Company, et al. (Clinton Power Station, Units 1 and 2), Sacramento Municipal Utility District (Rancho Seco Nuclear Generating Station); Issuances of the Directors Denial--Commonwealth Edison Company (Byron Station, Units 1 and 2), Consolidated Edison Company of New York, Inc. (Indian Point Unit No. 2), Gulf States Utilities Company (River Bend Station Units 1 and 2), Petition to Suspend All Operating Licenses for Pressurized Water Reactors (River Bend Station Units 1 and 2), Portland General Electric Company (Trojan Nuclear

  6. Nuclear Regulatory Commission issuances, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Defense (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances, May 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Impact of National Universities Commission (NUC) Accreditation ...

    African Journals Online (AJOL)

    Nekky Umera

    (NUC) accreditation exercise on university administrative structure of four selected Nigerian ... The Commission's recommendations led to the setting up by Government the National ... For instance, the goals of tertiary education as spelt out in ...

  9. Commissioning (Phases 4, 4A, 4B)

    National Research Council Canada - National Science Library

    Schofield, Andrew

    1997-01-01

    Phase 4 marked the completion of ANS&A's commitments under the BAA, as the new large centrifuge at the Waterways Experiment Station was commissioned and a series of research experiments were undertaken to demonstrate the breadth of new...

  10. Compressor Load Stand: Commissioning and Control Strategies

    National Research Council Canada - National Science Library

    Causey, Andrew

    1998-01-01

    .... The purpose of this research project was to commission this load stand, which includes setting up the hardware, setting up a control system, a data acquisition system, and an automatic test sequence system...

  11. The commissioning of nuclear power plants

    International Nuclear Information System (INIS)

    1989-09-01

    The objectives and requirements to be met in commissioning nuclear power plants are presented. The objective of commissioning is to ensure that each component, subsystem, system, or structure in a plant will be capable of fulfilling its design requirements throughout its design life. The requirements for commissioning are: the preparation of a detailed, comprehensive, documented program to demonstrate that all components, systems and structures relevant to safety meet design intent; documented evidence that safety systems are fully operable and can meet design requirements; and, appropriate documentation of the actual state or behaviour of all components, systems and structures relevant to safety. All systems must be included in the commissioning program. Whenever possible, full safety system test should be performed. If a full system in situ test is not possible, alternative means are suggested. (8 refs.)

  12. Nuclear Regulatory Commission issuances, July 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, June 1992

    International Nuclear Information System (INIS)

    1992-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, April 1994

    International Nuclear Information System (INIS)

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission Issuances, November 1980

    International Nuclear Information System (INIS)

    1980-11-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  16. Nuclear Regulatory Commission issuances, December 1991

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, December 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances, December 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, September 1992

    International Nuclear Information System (INIS)

    1992-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances, February 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, March 1993

    International Nuclear Information System (INIS)

    1993-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances, July 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances, August 1992

    International Nuclear Information System (INIS)

    1992-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. arXiv Medical Physics Commissioning

    CERN Document Server

    Meer, David

    The medical commissioning is an important step to bring a particle gantry into clinical operation for tumour treatments. This involves the parametrization and characterization of all relevant systems including the beam delivery, the patient table, the imaging systems and the connection to all required software components. This article is limited to necessary tasks for the beam delivery system of a pencil beam scanning system. Usually the commissioning starts with the characterization of the unscanned beam and the calibration of the beam energy. The following steps are the parametrization of the scanning system, the commissioning of the beam position monitoring system and characterization of the spot size, all requiring precisions better than 1 mm. The commissioning effort for these tasks depends also on the gantry topology. Finally, the calibration of the dose measurement system ensures that any dose distribution can be delivered with an absolute precision better than 1%.

  5. Nuclear Regulatory Commission issuances, May 1982

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission, the Atomic Safety and Licensing Appeal Boards, the Atomic Safety and Licensing Boards, the Administrative Law Judge, the Directors' Decision, and the Denials of Petitions for Rulemaking

  6. Commissioning the Linac Coherent Light Source injector

    Directory of Open Access Journals (Sweden)

    R. Akre

    2008-03-01

    Full Text Available The Linac Coherent Light Source is a SASE x-ray free-electron laser (FEL project presently under construction at SLAC [J. Arthur et al., SLAC-R-593, 2002.]. The injector section, from drive laser and rf photocathode gun through first bunch compressor chicane, was installed in the fall of 2006. The initial system commissioning with an electron beam was completed in August of 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photocathode drive laser, rf gun, photocathode, S-band and X-band rf systems, first bunch compressor, and the various beam diagnostics.

  7. Nuclear Regulatory Commission Issuances, December 1980

    International Nuclear Information System (INIS)

    1980-12-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  8. Nuclear Regulatory Commission issuances, August 1991

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Alaska State Commission for Human Rights

    Science.gov (United States)

    Harassment Poster Filing a Complaint with the Commission Public Hearing Cases Accusations Decisions Public . vs. Anchorage Plumbing and Heating Vilma Anderson vs. Anchorage School District Robin Block vs. Pulse

  10. LHC injection optics measurements at commissioning (2015)

    CERN Document Server

    Garcia-Tabares Valdivieso, Ana; Coello De Portugal - Martinez Vazquez, Jaime Maria; Garcia-Bonilla, Alba-Carolina; Langner, Andy Sven; Maclean, Ewen Hamish; Malina, Lukas; Mcateer, Meghan Jill; Persson, Tobias Hakan Bjorn; Skowronski, Piotr Krzysztof; Tomas Garcia, Rogelio; CERN. Geneva. ATS Department

    2016-01-01

    This report describes the measurement and correction process followed during the 2015 LHC injection optics commissioning which extended into Machine Developments (MDs). Results have been analyzed and compared to the 2012 measurements.

  11. Nuclear Regulatory Commission issuances, February 1993

    International Nuclear Information System (INIS)

    1993-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances, November 1992

    International Nuclear Information System (INIS)

    1992-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, April 1993

    International Nuclear Information System (INIS)

    1993-04-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Online Learning of Commission Avoidant Portfolio Ensembles

    OpenAIRE

    Uziel, Guy; El-Yaniv, Ran

    2016-01-01

    We present a novel online ensemble learning strategy for portfolio selection. The new strategy controls and exploits any set of commission-oblivious portfolio selection algorithms. The strategy handles transaction costs using a novel commission avoidance mechanism. We prove a logarithmic regret bound for our strategy with respect to optimal mixtures of the base algorithms. Numerical examples validate the viability of our method and show significant improvement over the state-of-the-art.

  15. The LHC from commissioning to operation

    CERN Document Server

    Lamont, M

    2011-01-01

    In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulating 1 fb-1 by the end of the year. The progress from commissioning to operation is described. Emphasis is put on the beam performance, but also on the performance of the different hardware systems. The role of collimation and machine protection is discussed, in view of the very high stored beam and magnet energy.

  16. Alberta Petroleum Marketing Commission annual report, 1993

    International Nuclear Information System (INIS)

    1994-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1993 marked the last full year of the Commission operating as Alberta's representative in the energy regulatory arena in Canada and the USA; due to restructuring, these functions will be transferred to the Ministry of Energy in early 1994. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 40.2 million bbl, down 11% from 1992, and receipts of heavy crude were 3.7 million bbl, down 42% from 1992. Revenue from crude oil sales was $800 million, down 25% from 1992. The Commission's natural gas activities in 1993 included price determination and information collection. 4 figs., 3 tabs

  17. Construction and commissioning test report of the CEDM test facility

    Energy Technology Data Exchange (ETDEWEB)

    Chung, C. H.; Kim, J. T.; Park, W. M.; Youn, Y. J.; Jun, H. G.; Choi, N. H.; Park, J. K.; Song, C. H.; Lee, S. H.; Park, J. K

    2001-02-01

    The test facility for performance verification of the control element drive mechanism (CEDM) of next generation power plant was installed at the site of KAERI. The CEDM was featured a mechanism consisting of complicated mechanical parts and electromagnetic control system. Thus, a new CEDM design should go through performance verification tests prior to it's application in a reactor. The test facility can simulate the reactor operating conditions such as temperature, pressure and water quality and is equipped with a test chamber to accomodate a CEDM as installed in the power plant. This test facility can be used for the following tests; endurance test, coil cooling test, power measurement and reactivity rod drop test. The commissioning tests for the test facility were performed up to the CEDM test conditions of 320 C and 150 bar, and required water chemistry was obtained by operating the on-line water treatment system.

  18. Construction and commissioning test report of the CEDM test facility

    International Nuclear Information System (INIS)

    Chung, C. H.; Kim, J. T.; Park, W. M.; Youn, Y. J.; Jun, H. G.; Choi, N. H.; Park, J. K.; Song, C. H.; Lee, S. H.; Park, J. K.

    2001-02-01

    The test facility for performance verification of the control element drive mechanism (CEDM) of next generation power plant was installed at the site of KAERI. The CEDM was featured a mechanism consisting of complicated mechanical parts and electromagnetic control system. Thus, a new CEDM design should go through performance verification tests prior to it's application in a reactor. The test facility can simulate the reactor operating conditions such as temperature, pressure and water quality and is equipped with a test chamber to accomodate a CEDM as installed in the power plant. This test facility can be used for the following tests; endurance test, coil cooling test, power measurement and reactivity rod drop test. The commissioning tests for the test facility were performed up to the CEDM test conditions of 320 C and 150 bar, and required water chemistry was obtained by operating the on-line water treatment system

  19. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  20. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  1. 75 FR 41106 - Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan to Update Water...

    Science.gov (United States)

    2010-07-15

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan to Update Water Quality Criteria for Toxic Pollutants in the Delaware... hold a public hearing to receive comments on proposed amendments to the Commission's Water Quality...

  2. 75 FR 81244 - Military Leadership Diversity Commission Meeting

    Science.gov (United States)

    2010-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission Meeting... will take place: 1. Name of Committee: Military Leadership Diversity Commission (MLDC). 2. Date... Military Leadership Diversity Commission to continue their efforts to address congressional concerns as...

  3. 75 FR 2114 - Military Leadership Diversity Commission (MLDC); Meeting

    Science.gov (United States)

    2010-01-14

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission (MLDC....150, the Department of Defense announces that the Military Leadership Diversity Commission (MLDC) will... commissioners of the Military Leadership Diversity Commission to continue their efforts to address congressional...

  4. Commissioning of the LHC Cryogenic System Subsystems Cold Commissioning in Preparation of Full Sector Tests

    CERN Document Server

    Serio, L; Ferlin, G; Gilbert, N; Gruehagen, Henning; Knoops, S; Parente, C; Sanmartí, M

    2006-01-01

    The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distributed around the 26.7-km circumference ring located in a deep underground tunnel. The status of the cryogenic system commissioning is presented together with the experience gained in operating and commissioning it.

  5. Project assembling and commissioning of a rewetting test facility

    International Nuclear Information System (INIS)

    Rezende, H.C.

    1985-08-01

    A test facility (ITR - Instalacao de Testes de Remolhamento) has been erected at the Thermal-hydraulics Laboratory of CDTN, dedicated to the investigation of the basic phenomena that can occur during the reflood phase of a Loss of Coolant Accident (LOCA) in a Pressurized Water Reactor (PWR), utilizing tubular and annular test sections. The present work consists in a presentation of the facility design and a report of its commissioning. The mechanical aspects of the facility, its power supply system and its instrumentation are described. The results of the instruments calibration and two operational tests are presented and a comparison is done with calculations perfomed usign a computer code. (Author) [pt

  6. H10915: NOS Hydrographic Survey , Gulf of Mexico, texas, 2000-02-16

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Oceanic and Atmospheric Administration (NOAA) has the statutory mandate to collect hydrographic data in support of nautical chart compilation for safe...

  7. H10876: NOS Hydrographic Survey , Gulf of Mexico, texas, 2000-02-05

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Oceanic and Atmospheric Administration (NOAA) has the statutory mandate to collect hydrographic data in support of nautical chart compilation for safe...

  8. H11177: NOS Hydrographic Survey , Gulf of Mexico, Texas, 2004-07-25

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Oceanic and Atmospheric Administration (NOAA) has the statutory mandate to collect hydrographic data in support of nautical chart compilation for safe...

  9. H11061: NOS Hydrographic Survey , Gulf of Mexico, Texas, 2002-01-16

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Oceanic and Atmospheric Administration (NOAA) has the statutory mandate to collect hydrographic data in support of nautical chart compilation for safe...

  10. H10011: NOS Hydrographic Survey , Gulf of Mexico, Texas, 1982-04-27

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Oceanic and Atmospheric Administration (NOAA) has the statutory mandate to collect hydrographic data in support of nautical chart compilation for safe...

  11. 76 FR 10233 - Schedule of Water Charges

    Science.gov (United States)

    2011-02-24

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 420 Schedule of Water Charges AGENCY: Delaware River..., Part III, Basin Regulations--Water Supply Charges. Accordingly, the Commission's water charging rates..., 2011. Effective Date: February 24, 2011. FOR FURTHER INFORMATION CONTACT: For questions about the water...

  12. Alberta Petroleum Marketing Commission annual report, 1992

    International Nuclear Information System (INIS)

    1993-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1992 marked the end of chronically depressed natural gas prices and a significant reduction in natural gas surpluses. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, unchanged from 1991, and receipts of heavy crude were 6.3 million bbl, up 4% from 1991. Revenue from crude oil sales was $1.1 billion, down from $1.64 billion in 1991. The Commission's natural gas activities in 1992 included price determination and information collection. 9 figs., 1 tab

  13. Alberta Petroleum Marketing Commission annual report, 1991

    International Nuclear Information System (INIS)

    1992-04-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. In 1991, the middle east crisis caused prices to spike at the commencement of the Gulf war, but these quickly stabilized. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, down 1.5% from 1990, and receipts of heavy crude were 6.1 million bbl, up 5% from 1990. Revenue from crude oil sales was $1,642,244,000, down from $2,078,197,000 in 1990. Loss of the Montreal market through pipeline closure led to increased pressure on prices, particularly on heavy crudes. The Commission's natural gas activities in 1991 included price determination and information collection. 9 figs., 1 tab

  14. The NRU blowdown test facility commissioning program

    Energy Technology Data Exchange (ETDEWEB)

    Walsworth, J A; Zanatta, R J; Yamazaki, A R; Semeniuk, D D; Wong, W; Dickson, L W; Ferris, C E; Burton, D H [Atomic Energy of Canada Ltd., Chalk River, ON (Canada). Chalk River Nuclear Labs.

    1990-12-31

    A major experimental program has been established at the Chalk River Nuclear Laboratories (CRL) that will provide essential data on the thermal and mechanical behaviour of nuclear fuel under abnormal reactor operating conditions and on the transient release, transport and deposition of fission product activity from severely degraded fuel. A number of severe fuel damage (SFD) experiments will be conducted within the Blowdown Test Facility (BTF) at CRL. A series of experiments are being conducted to commission this new facility prior to the SFD program. This paper describes the features and the commissioning program for the BTF. A development and testing program is described for critical components used on the reactor test section. In-reactor commissioning with a fuel assembly simulator commenced in 1989 June and preliminary results are given. The paper also outlines plans for future all-effects, in-reactor tests of CANDU-designed fuel. (author). 11 refs., 3 tabs., 7 figs.

  15. VINCI: the VLT Interferometer commissioning instrument

    Science.gov (United States)

    Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner

    2000-07-01

    The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.

  16. Commissioning of the Ground Test Accelerator RFQ

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H - injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2βγ Drift Tube Linac (DTL-1) module, the 8.7 MeV 2βγ DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations

  17. Commissioning of the ground test accelerator RFQ

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Garnott, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohsen, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Sandoval, D.P.; Saadatmand, K.; Stevens, R.R.Jr.; Vaughn, G.; Wadlinger, E.A.; Yuan, V.; Connolly, R.; Weiss, R.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on line. The commissioning stages are the 35-keV H - injector, the 2.5-MeV radio-frequency quadrupole (RFQ), the intertank matching section (IMS), the 3.2-MeV first 2-βλ drift tube linac (DTL-1) module, the 8.7-MeV 2-βλDTL (modules 1-5), and the 24-MeV GTA (all 10 DTL modules). Commissioning results from the RFQ beam experiments are presented along with comparisons with simulations. (Author) 8 refs., 9 figs

  18. Yale and the Atomic Bomb Casualty Commission

    International Nuclear Information System (INIS)

    Bowers, J.Z.

    1983-01-01

    This is a description, based largely on personal discussions, of the contributions of men from the Yale University School of Medicine to the saga of the immediate and long-term studies on the medical effects of the atomic bombs at Hiroshima and Nagasaki. They played key roles in the immediate studies of bomb effects, in the creation of long-term studies of delayed effects, and in elevating the Atomic Bomb Casualty Commission after 1955 to a position of excellence in its studies and relations with the Japanese. The accumulation of the information presented in this paper derives from research for the preparation of the history of the Atomic Bomb Casualty Commission. In 1975, the commission was passed to Japanese leadership as the Radiation Effects Research Foundation

  19. Law of the Energy Regulatory Commission

    International Nuclear Information System (INIS)

    1995-01-01

    This Decree-Law consist of three chapters each on divided in articles and subsections and came into force in November 1 st., 1995. Chapter I, with the heading 'Nature and Powers', defines the Energy Regulatory Commission as a decentralized organ of the Energy Secretariat with technical and operative autonomy in terms of the law, and establish the conditions for the sell, generation, exportation and importation of electricity with destination to particular and public services. The sell transport, storage and distribution of natural gas, as well as the gas liquefied from petroleum are also considered. Chapter II with the heading 'Organization and duties' establish that the Commission is integrated by five Committee, the President included. The Committee members will deliberate in collegiate manner and the decisions are by majority, having the President a vote of quality. Chapter III for 'General provisions' is related to the lawsuits arises between the Commission and the users of services. (Author)

  20. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  1. European commission research activities on iodine

    International Nuclear Information System (INIS)

    Loggia, E. della

    1996-01-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs

  2. European commission research activities on iodine

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, E della [European Commission, Brussels (Belgium)

    1996-12-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs.

  3. Commissioning of the ATLAS Liquid Argon Calorimeters

    CERN Document Server

    Cooke, M; The ATLAS collaboration

    2009-01-01

    Since the first modules of the ATLAS LAr calorimeters were read out in situ in 2006, commissioning studies have been performed. These studies include the testing of the electronics calibration system, surveys for dead or problematic channels, investigations of the quality of the physics pulse shape prediction , and tests of energy and time reconstruction with cosmic or single beam induced signals. The results of these commissioning studies indicate the LAr calorimeters are prepared for LHC collisions and positioned to meet the physics objectives of the ATLAS experiment.

  4. 1992 Nuclear Regulatory Commission Annual Report

    International Nuclear Information System (INIS)

    1993-01-01

    This is the 18th annual report of the US Nuclear Regulatory Commission (NRC), covering events and activities occurring in fiscal year 1992 (the year ending September 30, 1992), with some treatment of events from the last quarter of calendar year 1992. The NRC was created by enactment in the Congress of the Energy Reorganization Act of 1974. It is an independent agency of the Federal Government. The five NRC Commissioners are nominated by the President and confirmed by the United States Senate. The Chairman of the Commission is appointed by the President from among the Commissioners confirmed

  5. Jacques Delors - President de la Commission Europeenne

    Directory of Open Access Journals (Sweden)

    Dacian Graţian GAL

    2005-02-01

    Full Text Available This article refers to the President of the European Commission between 1985- 1995, Jacques Delors. He was the single person who exercised the presidency of the European Commission during 10 years and this period was one of the most important for the European construction: the achievement of the Single Market, the development of the Single Currency Unit project, of the new common politics, the enlargement of the European Union from 12 members to 15 members etc. Due the contribution of his presidency to the European construction, Jacques Delors is one of the parents of the European construction and one of the most important political men of the XX century.  

  6. 45 CFR 702.12 - Contempt of the Commission.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Contempt of the Commission. 702.12 Section 702.12 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS RULES ON HEARINGS, REPORTS, AND MEETINGS OF THE COMMISSION Hearings and Reports § 702.12 Contempt of the Commission...

  7. 29 CFR 2200.92 - Review by the Commission.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION RULES OF PROCEDURE Posthearing Procedures § 2200.92 Review by the Commission. (a) Jurisdiction of the Commission; issues on... Commission to review the entire case. The issues to be decided on review are within the discretion of the...

  8. 19 CFR 213.5 - Access to Commission resources.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Access to Commission resources. 213.5 Section 213.5 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in...

  9. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Science.gov (United States)

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  10. 76 FR 31307 - Commission of Fine Arts; Notice of Meeting

    Science.gov (United States)

    2011-05-31

    ... COMMISSION OF FINE ARTS Commission of Fine Arts; Notice of Meeting The next meeting of the U.S. Commission of Fine Arts is scheduled for June 16, 2011, at 10 a.m. in the Commission offices at the National Building Museum,Suite 312, Judiciary Square, 401 F Street, NW., Washington, DC, 20001-2728. Items of...

  11. 17 CFR 171.28 - Participation by Commission staff.

    Science.gov (United States)

    2010-04-01

    ... staff. 171.28 Section 171.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION..., Membership Denial and Registration Actions § 171.28 Participation by Commission staff. The Division of.... The Commission shall by order establish a supplementary briefing schedule for the Commission staff and...

  12. Crop-water-environment models; selected papers to the workshop organized by the ICID Working Group on `Sustainable Crops and Water Use' at the occasion of the 16th Congress of the International Commission on Irrigation and Drainage at Cairo, Egypt

    NARCIS (Netherlands)

    Ragab, R.; El-Din El-Quosy, D.; Broek, van den B.J.; Pereira, L.S.

    1996-01-01

    The main aim of this workshop was to bring individuals and organizations together who contribute to the development and upgrading of crop-water-environment models. Twenty-four model papers were presented in three sessions: pesticides and nitrates, salinity, and crop water balance. Each presentation

  13. Nuclear Regulatory Commission issuances, April 1989

    International Nuclear Information System (INIS)

    1989-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, July 1989

    International Nuclear Information System (INIS)

    1989-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, March 1989

    International Nuclear Information System (INIS)

    1989-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Danish Atomic Energy Commission 1974/75

    International Nuclear Information System (INIS)

    1975-11-01

    Activities of the Danish Atomic Energy Commission and the Risoe eesearch Establishment for the period April1, 1974 to March 31, 1975 are summarized. The operations of the various facilities at the Research Establishment are revised. Operating staff levels and financial data are tabulated, a selected list of staff publications is given, and the design data on research facilities are presented. (B.P.)

  17. Nuclear Regulatory Commission issuances, August 1990

    International Nuclear Information System (INIS)

    1990-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. The European Commission as Network Broker

    DEFF Research Database (Denmark)

    Borrás, Susana

    2007-01-01

    after the year 2000. Developing a conceptual framework about brokerage roles in EU policy, the article uses a combination of quantitative and qualitative data in an empirical analysis of two very different cases where the Commission has been embattled the past years. The article argues that previous...

  19. Nuclear Regulatory Commission issuances, December 1989

    International Nuclear Information System (INIS)

    1989-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Ten years after the Jali Commission

    African Journals Online (AJOL)

    Ten years have lapsed since the Jali Commission's final report became publicly available, and it is therefore an .... as the 'core business' of the department. This was seen as .... the 2009/10–2013/14 DCS Strategic Plan did the department ...

  1. Nuclear Regulatory Commission issuances, May 1989

    International Nuclear Information System (INIS)

    1989-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. 76 FR 55424 - CFC-50 Commission

    Science.gov (United States)

    2011-09-07

    ... conclude its work in approximately six months. 11. Termination. March 31, 2012. 12. Membership and... administrators of the campaign, participating charities and watchdog groups. These members will consist of both... Agency's approval, are responsible for directing the work of the Commission, including the creation of...

  3. Philippine Atomic Energy Commission: Annual report 1983

    International Nuclear Information System (INIS)

    1984-01-01

    This publication gives the highlights of the research and development projects of the Philippine Atomic Energy Commission in agriculture and food, nuclear fuels and power system technology, medicine, public health and nutrition, environmental surveillance, supportive basic research, social response to nuclear technology, nuclear licensing and safeguards, supportive technology and international and local linkages including manpower development. (ELC)

  4. Nuclear Regulatory Commission issuances, September 1987

    International Nuclear Information System (INIS)

    1987-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Bundled Discounts and the Antitrust Modernization Commission

    OpenAIRE

    Aaron Panner

    2007-01-01

    The Report of the Antitrust Modernization Commission devotes relatively little space to antitrust common law – the judge-made doctrine that governs unreasonable restraints of trade under Section 1 and monopolization under Section 2 of the Sherman Act.

  6. Nuclear Regulatory Commission issuances, May 1990

    International Nuclear Information System (INIS)

    1990-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances, May 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Division B Commission 40: Radio Astronomy

    NARCIS (Netherlands)

    Chapman, Jessica M.; Giovaninni, Gabriele; Taylor, Russell; Carilli, Christopher; Hills, Richard; Hirabayashi, Hisashi; Jonas, Justin L.; Lazio, Joseph; Morganti, Raffaella; Nan, Rendong; Rubio, Monica; Shastri, Prjaval; Kellermann, Ken; Ekers, Ronald; Ohishi, Masatoshi

    2016-01-01

    IAU Commission 40 for Radio Astronomy (hereafter C40) brought together scientists and engineers who carry out observational and theoretical research in radio astronomy and who develop and operate the ground and space-based radio astronomy facilities and instrumentation. As of June 2015, the

  9. Nuclear Regulatory Commission issuances, July 1988

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission Issuances, October 1986

    International Nuclear Information System (INIS)

    1986-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances, February 1989

    International Nuclear Information System (INIS)

    1989-02-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Commissioning of the ATLAS Liquid Argon Calorimeters

    CERN Document Server

    Cooke, Mark S

    2009-01-01

    A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies are presented. These include a coherent noise study, a measurement of the quality of the physics pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

  13. Agency transformation and state public utility commissions

    International Nuclear Information System (INIS)

    Jones, Douglas N.

    2006-01-01

    The demise of public utility commissions has been periodically predicted (sometimes hoped for). In their long history they have been attacked by critics as ineffective, inefficient, expensive, or unnecessary. Further, the demonstrated survivability of the commission concept has often been uncharitably attributed to powerful political constituencies, self-preservation manoeuvrings by commissioners themselves, and inertia. The implications of this article point another way. Commission regulation of public utilities has survived mainly because of continued need for social oversight of these critical industry sectors and the capacity of PUCs strategically to adapt to fundamental changes in their surroundings. Two transformational upheavals are treated here - a challenge of flexibility and responsiveness by the dramatic run-up in costs and prices in the 1970s and challenge to relevance by the policy shift to greater reliance on market competition in the 1990s - and regulation's successful accommodation to them. Viewed this way commission regulation is more in a position of 'second wind' than 'last breath'. (author)

  14. Nuclear Regulatory Commission issuances, June 1987

    International Nuclear Information System (INIS)

    1987-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decision (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, October 1989

    International Nuclear Information System (INIS)

    1989-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Commissioning for the European XFEL facility

    Science.gov (United States)

    Nölle, D.

    2017-06-01

    The European XFEL is a 4th generation light source based on the Self Amplified Spontaneous Emission (SASE) FreeElectron-Laser concept. It is currently being commissioned in North- Germany. The core installation is a 17.5 GeV superconducting accelerator driving 3 SASE lines with photon energies from 1 to beyond 20 keV range with a maximum of 27.000 pulses per second. The international facility is organized as a limited liability company with shareholders from the contributing countries. DESY has taken over the leadership of the accelerator construction consortium, and will be in charge of the operation of the accelerator complex. The facility was set up with contributions from the 11 shareholder countries, either being hardware systems and/or staff or cash contributions. The construction is almost complete, and the commissioning phase has started by the end of 2015. This contribution will report the status of the accelerator complex with emphasis on the commissioning of the accelerator and an outlook to the commissioning of the SASE 1 FEL line.

  17. Commissioning of the RFQ1 injector

    International Nuclear Information System (INIS)

    Arbique, G.M.; Sheikh, J.Y.; Taylor, T.; Birney, L.F.; Davidson, A.D.; Wills, J.S.C.

    1987-01-01

    The RFQ1 accelerator is being developed at Chalk River to test the limits of the cw RFQ technology. A 50 kV injector has been built and is now being commissioned as the first phase of the program. This paper describes some of the innovative features of the RFQ1 injector and reports on initial operating experience

  18. Nuclear Regulatory Commission issuances, December 1990

    International Nuclear Information System (INIS)

    1990-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, April 1991

    International Nuclear Information System (INIS)

    1991-04-01

    This report includes the issuances received during the specified period (April 1991) from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regualtory Commission Issuances, October 1981

    International Nuclear Information System (INIS)

    1981-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors Denial (DD), and the Denial of Petitions for Rulemaking

  1. Status and commissioning of the CMS experiment

    Science.gov (United States)

    Wulz, C.-E.

    2008-05-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  2. Status and Commissioning of the CMS Experiment

    CERN Document Server

    Wulz, Claudia-Elisabeth

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  3. Status and commissioning of the CMS experiment

    International Nuclear Information System (INIS)

    Wulz, C-E

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented

  4. Nuclear Regulatory Commission issuances, April 1987

    International Nuclear Information System (INIS)

    1987-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission Issuances, August 1986

    International Nuclear Information System (INIS)

    1986-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances, November 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission Issuances, March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances, November 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, June 1990

    International Nuclear Information System (INIS)

    1990-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    D. Acosta

    Point 5 commissioning activities Since the last CMS week there has been little global commissioning activities: the first mid week global run aiming to assess the status of the hardware and DAQ software after the winter maintenance and developments has taken place two weeks ago involving all subdetectors but tracker and pixel whose hardware is still being actively worked on. The local commissioning restarted once the cooling became available again the third week of January. Below are detailed the main activities which have taken place so far. DAQ The activity of the central DAQ group during pause of global runs was focused on various items. The commissioning of the 900 new PCs which will be used to run the HLT processes has been almost completed. It is planned to use these PCs in the first global run at the start of March. In addition the location of various server PCs which host essential functionalities to get the private ".cms" network going, has been re-organized to allow to implemen...

  11. 76 FR 63325 - National Indian Gaming Commission

    Science.gov (United States)

    2011-10-12

    ... General Accepted Accounting Principles (GAAP). Many comments stated that if this definition was amended... result in an enforcement action and closure order. 25 CFR 573.6(a)(7). II. Definitions--Net Revenues--management fee The NOI asked whether the Commission should consider whether the definition of net revenues...

  12. Nuclear Regulatory Commission issuances, February 1985

    International Nuclear Information System (INIS)

    1985-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. 76 FR 27034 - Equity and Excellence Commission

    Science.gov (United States)

    2011-05-10

    .... The Commission will also make recommendations for restructuring school finance systems to achieve... educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in which Federal policies could address such disparities. The agenda for the...

  14. 75 FR 48661 - Equity and Excellence Commission

    Science.gov (United States)

    2010-08-11

    .... The Commission will also make recommendations for restructuring school finance systems to achieve... educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in which Federal policies could address such disparities. In order to achieve...

  15. Nuclear Regulatory Commission issuances, November 1990

    International Nuclear Information System (INIS)

    1990-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Securities and Exchange Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...: Alicia Goldin, Division of Trading and Markets, Securities and Exchange Commission, 100 F Street NE... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...

  17. Appalachian Regional Commission: 1982 Annual Report.

    Science.gov (United States)

    Appalachian Regional Commission, Washington, DC.

    Fiscal year 1982 was transitional for the Appalachian Regional Commission (ARC), as it was the last year of the broad economic development program and a year of reduced funding and new limits on programs. In 1981, Congress had requested that ARC prepare a plan for completion of the Appalachian highway system and for a 3 to 5 year ARC finish-up…

  18. Appalachian Regional Commission: 1979 Annual Report.

    Science.gov (United States)

    Appalachian Regional Commission, Washington, DC.

    Narrative text, tables, maps, and photographs present an overview of the Appalachian Regional Commission's (ARC) activities in fiscal year 1979, past achievements, and future goals. Major accomplishments of 1979 include: utilization of the $233 million appropriation for highway construction; approval of over $143 million in ARC funds for 985…

  19. Curriculum for Commissioning Energy Efficient Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Webster, Lia [Portland Energy Conservation, Inc., OR (United States)

    2012-12-27

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  20. Commissioning of output factors for uniform scanning proton beams

    International Nuclear Information System (INIS)

    Zheng Yuanshui; Ramirez, Eric; Mascia, Anthony; Ding Xiaoning; Okoth, Benny; Zeidan, Omar; Hsi Wen; Harris, Ben; Schreuder, Andries N.; Keole, Sameer

    2011-01-01

    Purpose: Current commercial treatment planning systems are not able to accurately predict output factors and calculate monitor units for proton fields. Patient-specific field output factors are thus determined by either measurements or empirical modeling based on commissioning data. The objective of this study is to commission output factors for uniform scanning beams utilized at the ProCure proton therapy centers. Methods: Using water phantoms and a plane parallel ionization chamber, the authors first measured output factors with a fixed 10 cm diameter aperture as a function of proton range and modulation width for clinically available proton beams with ranges between 4 and 31.5 cm and modulation widths between 2 and 15 cm. The authors then measured the output factor as a function of collimated field size at various calibration depths for proton beams of various ranges and modulation widths. The authors further examined the dependence of the output factor on the scanning area (i.e., uncollimated proton field), snout position, and phantom material. An empirical model was developed to calculate the output factor for patient-specific fields and the model-predicted output factors were compared to measurements. Results: The output factor increased with proton range and field size, and decreased with modulation width. The scanning area and snout position have a small but non-negligible effect on the output factors. The predicted output factors based on the empirical modeling agreed within 2% of measurements for all prostate treatment fields and within 3% for 98.5% of all treatment fields. Conclusions: Comprehensive measurements at a large subset of available beam conditions are needed to commission output factors for proton therapy beams. The empirical modeling agrees well with the measured output factor data. This investigation indicates that it is possible to accurately predict output factors and thus eliminate or reduce time-consuming patient-specific output

  1. 18 CFR 376.206 - Delegation of functions of certain Commission staff members.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Delegation of functions... Conditions § 376.206 Delegation of functions of certain Commission staff members. When, by reason of... subordinate employee in the Office or Division of the highest grade and longest period of service in that...

  2. 18 CFR 366.2 - Commission access to books and records.

    Science.gov (United States)

    2010-04-01

    ... books and records. 366.2 Section 366.2 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and the Natural Gas Act § 366.2 Commission access to books and records. (a) In general...

  3. 18 CFR 39.6 - Conflict of a Reliability Standard with a Commission Order.

    Science.gov (United States)

    2010-04-01

    ... Reliability Standard with a Commission Order. 39.6 Section 39.6 Conservation of Power and Water Resources..., APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.6 Conflict of a Reliability Standard with... Transmission Organization determines that a Reliability Standard may conflict with a function, rule, order...

  4. Optimization of the commissioning period of nuclear power plant

    International Nuclear Information System (INIS)

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  5. Programme of the Commission for 1978. [Booklet

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    Mr. Jenkins, President of the Commission, first examines the problem of the economy and the level of its unemployment in the Community, resulting in a lack of growth. He than presents the two-fold aim of the Commission--to instigate emergency action to sustain industries that are no longer fully competitive and to promote economic growth to provide employment and prosperity. He then examins the energy and agriculture sectors. Two obligations cited for the Community are: (1) to defend Community interests in the energy field in relation to Third World Countries, and (2) to make clear the connections between energy policy and the general economic strategy. Negotiations are underway for enlargement of the community with applications being considered for Greece, Portugal, and Spain. A memorandum annexed to the address contains additional material on building an integrated economic unit, the European citizen and his environment, Europe in the world, and enlargement of the community. (MCW)

  6. A History of the Atomic Energy Commission

    Science.gov (United States)

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  7. LHC Damper Beam commissioning in 2010

    CERN Document Server

    Höfle, W; Schokker, M; Valuch, D

    2011-01-01

    The LHC transverse dampers were commissioned in 2010 with beam and their use at injection energy of 450 GeV, during the ramp and in collisions at 3.5 TeV for Physics has become part of the standard operations pro- cedure. The system proved important to limit emittance blow-up at injection and to maintain smaller than nominal emittances throughout the accelerating cycle. We describe the commissioning of the system step-by-step as done in 2010 and summarize its performance as achieved for pro- ton as well as ion beams in 2010. Although its principle function is to keep transverse oscillations under control, the system has also been used as an exciter for abort gap clean- ing and tune measurement. The dedicated beam position measurement system with its low noise properties provides additional possibilities for diagnostics.

  8. Activity report 2015 Commission Perspectives du Reseau

    International Nuclear Information System (INIS)

    Ricour, Olivia

    2016-01-01

    This document contains the activity report for 2015 of the Commission Perspectives du Reseau which has been set up by RTE to be the main body for organising a dialogue with all the actors of the energy sector and civil society about challenges and stakes of the electric power system on the medium and on the long term. It describes how this body aims at sharing knowledge and expertise of all stakeholders (publications, European platform for data transparency), at being a place for debating and enriching the understanding of tomorrow's important stakes for the power system (discussion of the issue of greenhouse gas emissions with an analysis of the impact of the CO 2 price signal on emissions by the European electricity system and results of the e-Highway 2050 European project). The road-map of the Commission works for 2016 is provided, as well as a list of members

  9. Nuclear Regulatory Commission issuances, May 1993

    International Nuclear Information System (INIS)

    1993-05-01

    This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors' Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers

  10. Nuclear Regulatory Commission Information Digest 1992 edition

    International Nuclear Information System (INIS)

    Olive, K.

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  11. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    A. Ryd and T. Camporesi

    2010-01-01

    Commissioning and Run Coordination activities After the successful conclusion of the LHC pilot run commissioning in 2009 activities at the experiment restarted only late in January due to the cooling and detector maintenance. As usual we got going with weekly exercises used to deploy, debug, and validate improvements in firmware and software. A debriefing workshop aimed at analyzing the operational aspects of the 2009 pilot run was held on Jan. 15, 2009, to define a list of improvements (and relative priorities) to be planned. In the last month, most of the objectives set in the debriefing workshop have been attained. The major achievements/improvements obtained are the following: - Consolidation of the firmware for both readout and trigger for ECAL - Software implementation of procedures for raising the bias voltage of the silicon tracker and pixel driven by LHC mode changes with automatic propagation of the state changes from the DCS to the DAQ. The improvements in the software and firmware allow suppress...

  12. Canadian Nuclear Safety Commission's intern program

    International Nuclear Information System (INIS)

    Gilmour, P.E.

    2002-01-01

    The Intern Program was introduced at the Canadian Nuclear Safety Commission, Canada's Nuclear Regulator in response to the current competitive market for engineers and scientists and the CNSC's aging workforce. It is an entry level staff development program designed to recruit and train new engineering and science graduates to eventually regulate Canada's nuclear industry. The program provides meaningful work experience and exposes the interns to the general work activities of the Commission. It also provides them with a broad awareness of the regulatory issues in which the CNSC is involved. The intern program is a two-year program focusing on the operational areas and, more specifically, on the generalist functions of project officers. (author)

  13. Commissioning of the TRIUMF ISAC RF system

    International Nuclear Information System (INIS)

    Fong, K.; Fang, S.; Laverty, M.; Lu, J.; Poirier, R.L.

    2001-09-01

    The ISAC RF system at present consists of a Radio Frequency Quadrupole accelerator, five Drift Tube Linear Accelerators, six bunchers, two choppers and a bunch rotator. The RFQ operates at the fundamental frequency of 35.36 MHz, while the DTLs operate at the third harmonic frequency of 106.08 MHz. The operating power ranges from 45 W to 120 W for the choppers, 1 kW to 20 kW for the DTLs and bunchers, and 80 kW for the RFQ. These cavities have been commissioned to operate synchronously with both closed-loop amplitude and phase regulation, as well as automatic tuning of the cavities. This paper gives a brief summary of the commissioning experience. (author)

  14. History of the Atomic Energy Commission

    International Nuclear Information System (INIS)

    Buck, A.L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  15. Status of the SPIRAL2 injector commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Thuillier, T., E-mail: thuillier@lpsc.in2p3.fr; Angot, J.; Jacob, J.; Lamy, T.; Sole, P. [LPSC, Université Grenoble Alpes, CNRS/IN2P3, 53 rue des Martyrs, 38026 Grenoble Cedex (France); Barué, C.; Bertrand, P.; Canet, C.; Ferdinand, R.; Flambard, J.-L.; Jardin, P.; Lemagnen, F.; Maunoury, L.; Osmond, B. [GANIL, CNRS/IN2P3, Bvd Henri Becquerel, BP 55027, 14076 Caen Cedex 5 (France); Biarrotte, J. L. [IPN Orsay, Université Paris Sud, CNRS/IN2P3, 15 rue Georges Clémenceau, 91406 Orsay Cedex (France); Denis, J.-F.; Roger, A.; Touzery, R.; Tuske, O.; Uriot, D. [Irfu, CEA Saclay, DSM/Irfu/SACM, 91191 Gif Sur Yvette (France); and others

    2016-02-15

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.

  16. History of the Atomic Energy Commission

    International Nuclear Information System (INIS)

    Buck, A.L.

    1982-08-01

    This pamphlet traces the history of the Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946, to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  17. Nuclear Regulatory Commission Information Digest, 1991 edition

    International Nuclear Information System (INIS)

    Olive, K.L.

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs

  18. Division V: Commission 42: Close Binaries

    Science.gov (United States)

    Ribas, Ignasi; Richards, Mercedes T.; Rucinski, Slavek; Bradstreet, David H.; Harmanec, Petr; Kaluzny, Janusz; Mikolajewska, Joanna; Munari, Ulisse; Niarchos, Panagiotis; Olah, Katalin; Pribulla, Theodor; Scarfe, Colin D.; Torres, Guillermo

    2015-08-01

    Commission 42 (C42) co-organized, together with Commission 27 (C27) and Division V (Div V) as a whole, a full day of science and business sessions that were held on 24 August 2012. The program included time slots for discussion of business matters related to Div V, C27 and C42, and two sessions of 2 hours each devoted to science talks of interest to both C42 and C27. In addition, we had a joint session between Div IV and Div V motivated by the proposal to reformulate the division structure of the IAU and the possible merger of the two divisions into a new Div G. The current report gives an account of the matters discussed during the business session of C42.

  19. Nuclear Regulatory Commission issuances, September 1988

    International Nuclear Information System (INIS)

    1988-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  20. Securities and Exchange Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ...: 3235-AK58 420. REVISIONS TO REGULATION D Legal Authority: 15 USC 77b(a)(15); 15 USC 77b(b); 15 USC 77d; 15 USC 77r; 15 USC 77s; 15 USC 77s(a); 15 USC 77z-3 Abstract: The Division is considering... SOLICITATION ENHANCEMENTS Legal Authority: 15 USC 78n Abstract: The Commission proposed amendments to its proxy...

  1. Viet Nam National Atomic Energy Commission

    International Nuclear Information System (INIS)

    1992-01-01

    Vietnam National Atomic Energy Commission (VINATOM) is a governmental body in charge of organizing and coordinating activities related to use of nuclear energy for peaceful purpose. VINATOM in structure consists of the Nuclear Research Institute (Dalat), the Institute of Nuclear Science and Technology (Hanoi), the Institute for Technology of Radioactive and Rare Elements (Hanoi), and the Centre for Nuclear Technique Application (Ho Chi Minh City). This catalogue introduces profiles of nuclear R and D activities under management by VINATOM. (N.H.A)

  2. Indexes to Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index

  3. European commission report on market opening

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    Governments must step up their effort to implement measures relating to market opening within the framework of the directives on gas and electricity. Only greater integration of national markets will produce the improvements required from a competitive point of view on the domestic energy market. These are the main conclusions of the annual report on domestic electricity and gas market operation adopted by the European Commission at the beginning of January 2005. (author)

  4. Indexes to Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

  5. COMMISSIONING CNI PROTON POLARIMETERS IN RHIC

    International Nuclear Information System (INIS)

    HUANG, H.; BRAVAR, A.; LI, Z.; MACKAY, W.W.; MAKDISI, Y.; RESCIA, S.; ROSER, T.; SURROW, B.; BUNCE, G.; DESHPANDE, A.; GOTO, Y.; ET AL

    2002-01-01

    Two polarimeters based on proton carbon elastic scattering in the Coulomb Nuclear Interference (CNI) region have been installed and commissioned in the Blue and Yellow rings of RHIC during the first RHIC polarized proton collider run. Each polarimeter consists of ultra-thin carbon targets and six silicon detectors. With newly developed wave form digitizers, they provide fast and reliable polarization information for both rings

  6. Philippine Atomic Energy Commission: Annual report 1982

    International Nuclear Information System (INIS)

    1983-02-01

    This publication enumerates the research and development activities of the Philippine Atomic Energy Commission with priorities geared towards achieving the economic and social upliftment of the Filipinos in the field of agriculture, energy, industry, health and environment. Highlights are summaries of investigations and studies of great importance in crop improvement, animal production, nuclear fuels, nutrition research, not to mention its supportive technology, technical services, nuclear information and public acceptance, and nuclear manpower development. (RTD)

  7. Report on air and water radioactivity measurement presented to the Commission for Protection against Ionizing Radiations of the State Secretary for Public Health (sessions of the 6 January and 18 February 1957). Report on the determination of radioactivity of mineral waters presented to High Council for Thermal cures of the State Secretary for Public Health (6 February 1957)

    International Nuclear Information System (INIS)

    Fallot, P.; Bugnard, L.

    1957-06-01

    The first part of this document discusses radioactivity measurement techniques which seem to be recommended for the monitoring of the release of radio-elements by civil and military applications of nuclear energy. These methods first concern air radioactivity due to uranium ore extraction, ore storage, air-cooling of piles, uranium fuel sheath failure, plutonium extraction and fission product processing, and nuclear explosion. Methods are discussed for the measurement of gas or aerosol radioactivity. The measurement of water radioactivity is then addressed by distinguishing measurements performed on rainfalls or snow, on effluents from nuclear plants. The second part discusses the determination of radioactivity of mineral waters. The authors describe the three main principles on which measurement methods are based: direct measurement of radioactivity of gases contained by water, direct measurement of gas radioactivity by the active deposit method, and measurement of alpha and beta radiations of the evaporation residue or of water precipitation product. Notably about radon measurement in waters, the instrumentation, dosing procedure, measurement sensitivity and precision are presented and discussed

  8. Commissioning an Engineering Scale Coal Gasifier

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Douglas J.; Bearden, Mark D.; Cabe, James E.

    2010-07-01

    This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

  9. Nuclear Regulatory Commission Information Digest: 1993 edition

    International Nuclear Information System (INIS)

    1993-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the U.S. Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1992, with exceptions noted. Information on generating capacity and average capacity factor for operating U.S. commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed. Comments and/or suggestions on the data presented are welcomed and should be directed to Karen Olive, United States Nuclear Regulatory Commission, Office of the Controller, Division of Budget and Analysis, Washington, D.C. 20555. For detailed and complete information about tables and figures, refer to the source publications

  10. NSLS-II commissioning and operation

    Energy Technology Data Exchange (ETDEWEB)

    Wang, G., E-mail: gwang@bnl.gov; Shaftan, T.; Bassi, G.; Bengtsson, J.; Blednykh, A.; Blum, E.; Cheng, W.; Choi, J.; Davidsaver, M.; Doom, L.; Fliller, R.; Ganetis, G.; Guo, W.; Hidaka, Y.; Kramer, S.; Li, Y.; Podobedov, B.; Qian, K.; Rose, J.; Seletskiy, S. [Brookhaven National Laboratory, Upton, NY 11973 (United States); and others

    2016-07-27

    The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

  11. CEBAF Cryomodule Commissioning in the South Linac

    International Nuclear Information System (INIS)

    M. Drury; H. Lankford; T. Lee; J. Marshall; J. Preble; Q. Saulter; W. Schneider; Michael Spata; Mark Wiseman

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, 38 1/4 cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz[1]. A cryomodule must provide an energy gain of 20 MeV to the 200 mu-A beam[2]. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's (Q(sub ext)) of the cavity ports, the unloaded Q (Q(sub 0)) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity[3]. Finally, the mechanical tuners are cycled and characterized. A portable test stand allows local control of the rf system and provides automated data acquisition. During the period from April 1993 through September 1993, 16 of the 20 cryomodules installed in the South Linac were commissioned. All cryomodules tested in the South Linac meet or exceed the CEBAF specifications. This paper describes the results of the commissioning of the first 10 cryomodules in the South Linac

  12. Emergency operation procedure navigation to avoid commission errors

    International Nuclear Information System (INIS)

    Gofuku, Akio; Ito, Koji

    2004-01-01

    New types of operation control system equipped with a large screen and CRT-based operation panels have been installed in newly constructed nuclear power plants. The operators can share important information of plant conditions by the large screen. The operation control system can know the operations by operators through the computers connected to the operation panels. The software switches placed in the CRT-based operation panels have a problem such that operators may make an error to manipulate an irrelevant software switch with their current operation. This study develops an operation procedure navigation technique to avoid this kind of commission errors. The system lies between CRT-based operation panels and plant control systems and checks an operation by operators if it follows the operation procedure of operation manuals. When the operation is a right one, the operation is executed as if the operation command is directly transmitted to control systems. If the operation does not follow the operation procedure, the system warns the commission error to operators. This paper describes the operation navigation technique, format of base operation model, and a proto-type operation navigation system for a three loop pressurized water reactor plant. The validity of the proto-type system is demonstrated by the operation procedure navigation for a steam generator tube rupture accident. (author)

  13. 78 FR 2315 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2013-01-10

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...

  14. 78 FR 15402 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2013-03-11

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...

  15. 78 FR 11947 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2013-02-20

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...

  16. 78 FR 27471 - Projects Rescinded for Consumptive Uses of Water

    Science.gov (United States)

    2013-05-10

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Rescinded for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the approved by rule projects..., being rescinded for the consumptive use of water pursuant to the Commission's approval by rule process...

  17. 78 FR 17281 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2013-03-20

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...

  18. 77 FR 16317 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2012-03-20

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...

  19. 77 FR 66909 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2012-11-07

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... below, receiving approval for the consumptive use of water pursuant to the Commission's approval by rule...

  20. 77 FR 21143 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2012-04-09

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...

  1. 77 FR 25010 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2012-04-26

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... below, receiving approval for the consumptive use of water pursuant to the Commission's approval by rule...

  2. 77 FR 34455 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2012-06-11

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...

  3. 77 FR 55891 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2012-09-11

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...

  4. 77 FR 55893 - Projects Rescinded for Consumptive Uses of Water

    Science.gov (United States)

    2012-09-11

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Rescinded for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects rescinded by the... the consumptive use of water pursuant to the Commission's approval by rule process set forth in 18 CFR...

  5. 77 FR 59240 - Projects Rescinded for Consumptive Uses of Water

    Science.gov (United States)

    2012-09-26

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Rescinded for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects rescinded by the... rescinded for the consumptive use of water pursuant to the Commission's approval by rule process set forth...

  6. 77 FR 55892 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2012-09-11

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...

  7. 77 FR 59239 - Projects Approved for Consumptive Uses of Water

    Science.gov (United States)

    2012-09-26

    ... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...

  8. 78 FR 58985 - Proposed Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Update...

    Science.gov (United States)

    2013-09-25

    ..., Water Code and Comprehensive Plan to update stream quality objectives (also called ``water quality..., to Commission Secretary at 609-883-9522; if by U.S. Mail, to Commission Secretary, DRBC, P.O. Box...-7203. SUPPLEMENTARY INFORMATION: Background. The Commission in 1967 assigned stream quality objectives...

  9. State Electricity Commission of Victoria annual report 1991/92

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The 73rd annual report of the State Electricity Commission (SEC) of Victoria covers the financial year ended 30 June 1992. A total revenue of 3,300 million dollars and a net profit of 155.7 million dollars was recorded. There was continued improvement in employee productivity. Progress was made on the Victorian Power Pool (VicPool) pooling arrangement in anticipation of open access to the power grid. A 3-year business plan was formulated and corporate strategy revised. The Strategic Research Program on brown coal technologies, aimed at reducing costs of electricity and emissions of CO[sub 2], continued. Environmental activities continued in the areas of renewable energy source development, air quality monitoring, acid rain, water management, land rehabilitation and improvements to powerlines. The report includes statistical data on customer statistics, electricity sales, power stations, brown coal and briquette production and financial sales.

  10. Environmental management in the Hydro-Electric Commission

    International Nuclear Information System (INIS)

    Scanlon, A.

    1995-01-01

    The Tasmanian Hydro Electric Commission (HEC) is a large and diverse organization, providing electricity generation, transmission, distribution and retail services throughout Tasmania. It is a significant manager of Tasmania's land and water resources and, as a consequence, has important environmental responsibilities. This paper outlines the background to conflict with the environmental movement over power generation development projects in south western Tasmania and the development of an environmental policy. As part of the environmental policy, the HEC has prepared environmental reviews, audits and risk assessment and is currently developing and implementing a comprehensive environmental management system. The HEC sees the introduction of the environmental management system as demonstrating a commitment to continuing environmental improvement and in establishing itself as a Tasmanian and national leader in the area of environmental management. 1 tab., 2 figs., 4 refs

  11. Short Circuit Tests First Step of LHC Hardware Commissioning Completion

    CERN Document Server

    Barbero-Soto, E; Bordry, Frederick; Casas Lino, M P; Coelingh, G J; Cumer, G; Dahlerup-Petersen, K; Guillaume, J C; Inigo-Golfin, J; Montabonnet, V; Nisbet, D; Pojer, M; Principe, R; Rodríguez-Mateos, F; Saban, R; Schmidt, R; Thiesen, H; Vergara-Fernández, A; Zerlauth, M; Castaneda Serra, A; Romera Ramirez, I

    2008-01-01

    For the two counter rotating beams in the Large Hadron Collider (LHC) about 8000 magnets (main dipole and quadrupole magnets, corrector magnets, separation dipoles, matching section quadrupoles etc.) are powered in about 1500 superconducting electrical circuits. The magnets are powered by power converters that have been designed for the LHC with a current between 60 and 13000A. Between October 2005 and September 2007 the so-called Short Circuit Tests were carried-out in 15 underground zones where the power converters of the superconducting circuits are placed. The tests aimed to qualify the normal conducting equipments of the circuits such as power converters and normal conducting high current cables. The correct operation of interlock and energy extraction systems was validated. The infrastructure systems including AC distribution, water and air cooling and the control systems was also commissioned. In this paper the results of the two year test campaign are summarized with particular attention to problems e...

  12. Radioactive Waste Treatment and Conditioning Using Plasma Technology Pilot Plant: Testing and Commissioning

    International Nuclear Information System (INIS)

    Rafizi Salihuddin; Rohyiza Baan; Norasalwa Zakaria

    2016-01-01

    Plasma pilot plant was commissioned for research and development program on radioactive waste treatment. The plant is equipped with a 50 kW direct current of non-transferred arc plasma torch which mounted vertically on top of the combustion chamber. The plant also consists of a dual function chamber, a water cooling system, a compress air supply system and a control system. This paper devoted the outcome after testing and commissioning of the plant. The problems arise was discussed in order to find the possible suggestion to overcome the issues. (author)

  13. A CEGB system for the assurance of quality in the commissioning of power plant

    International Nuclear Information System (INIS)

    Lake, M.W.

    1984-01-01

    This paper outlines a system of organization, documentation and surveillance which has been fully proven in practice and looks ahead to identify the arrangements for the organization, documentation, and audit which the CEGB proposes to use in the commissioning of the Sizewell 'B' PWR, so that quality may be assured. In the UK between 1967 and 1982, the CEGB commissioned approximately 40,000 M Watts of power plant. This comprised power plants that were coal fired, oil fired, water driven, gas turbine driven and nuclear (both magnox and advanced gas cooled (AGR) reactors)

  14. 17 CFR 146.9 - Appeals to the Commission.

    Science.gov (United States)

    2010-04-01

    ... Commission or any Commission employee has failed or refused to comply with provisions of the Privacy Act or... disagreement has been filed shall clearly note the portion which is disputed, and include a copy of the...

  15. Commissioning of Nuclear Power Plants. The AREVA approach

    International Nuclear Information System (INIS)

    Mateo, G.

    2014-01-01

    Georges Mateo, Fellow Expert at AREVA, closed the last day of conferences by detailing deeply the different phases of NPPs commissioning. He insisted on the skills required to be a Commissioning engineer and on the carrier opportunities that it offers

  16. Decommissioning and radioactive waste management. The European Commission overview

    International Nuclear Information System (INIS)

    Rehak, M

    2010-01-01

    In this lecture author deals with the European Commission overview on the decommissioning and radioactive waste management. Financial support of European Commission of decommissioning of the Ignalina NPP, Bohunice V1 NPP and Kozloduy Units 1 and 2 is presented.

  17. International Commission on Radiological Protection. History, policies, procedures

    International Nuclear Information System (INIS)

    Lindell, Bo; Dunster, H.J.; Valentin, Jack; )

    2000-01-01

    This report briefly reviews the history, mode of operation, concepts, and current policies of the International Commission on Radiological Protection (ICRP). It touches upon the objectives of the Commission's recommendations, the quantities used, the biological basis of the Commission's policy, the quantitative basis for its risk estimates, the structure of the system of protection, some problems of interpretation and application in that system, and the need for stability, consistency, and clarity in the Commission's recommendations. (author)

  18. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  19. Stepwise commissioning of a steam boiler with stability guarantees

    DEFF Research Database (Denmark)

    Johansen, Simon Vestergaard; Kallesøe, Carsten Skovmose; Bendtsen, Jan Dimon

    2016-01-01

    This paper aims to make the commissioning of an industrial MIMO controller more straightforward by gradually commissioning it from a set of SISO controllers, after the system has been started. For this purpose a stepwise commissioning strategy based on the Youla-Kucera parametrization has been de...... been commissioned from a SISO controller using the developed method on a real steam boiler and measurements show a clear performance improvement after transition....

  20. C46 `ASTRONOMY Education and Development': a Peculiar Commission

    Science.gov (United States)

    de Greve, Jean-Pierre; García, Beatriz; Gerbaldi, Michèle; Ferlet, Roger; Guinan, Edward; Hearnshaw, John; Jones, Barrie; Marschall, Laurence; Miley, George; Pasachoff, Jay; Ros, Rosa; Stavinschi, Magda; Torres-Peimbert, Silvia

    2016-04-01

    C46 was a Commission of the Executive Committee of the IAU under Division XII (Union-Wide Activities), then after 2012 under Division C (Education, Outreach, and Heritage). It was the only commission dealing exclusively with astronomy education; a previous Commission 38 (Exchange of Astronomers), which allocated travel grants to astronomers who needed them, and a Working Group on the Worldwide Development of Astronomy, have been absorbed by Commission 46.

  1. Point Lepreau G.S. commissioning management experience

    International Nuclear Information System (INIS)

    Alikhan, S.; Walker, W.J.

    1983-05-01

    This paper shares the experience gained by New Brunswick Power in commissioning its first nuclear plant, with particular emphasis on the management techniques that were developed. Some of the areas discussed include: organization of Nuclear Operations Group responsible for commissioning and its interface with construction; outline and scope of documentation required to define, execute and report commissioning to satisfy the licensing requirements, management techniques developed to implement commissioning; and a summary of lessons learned and recommendations for the future

  2. Commissioning of the ATLAS pixel detector

    International Nuclear Information System (INIS)

    Golling, Tobias

    2008-01-01

    The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008, and is ready for the imminent LHC turn-on. The highlights of the past and future commissioning activities of the ATLAS pixel system are presented

  3. Nuclear Regulatory Commission issuances, March 1975

    International Nuclear Information System (INIS)

    1975-04-01

    Reactor licensing actions taken by the Nuclear Regulatory Commission, the Atomic Safety and Licensing Appeal Board and the Atomic Safety and Licensing Boards for March 1975 are presented. Action was included for the following reactors: Big Rock Point Nuclear Plant; West Valley Reprocessing Plant; Limerick Generating Station, Units 1 and 2; Midland Plants, Units 1 and 2; Wolf Creek Generating Station, Unit 1; Monticello Nuclear Generating Plant, Unit 1; Douglas Point Nuclear Generating Station, Units 1 and 2; Seabrook Station, Units 1 and 2; Vermont Yankee Nuclear Power Station; and WPPSS Hanford Units 1 and 4. (U.S.)

  4. The ATLAS Trigger System Commissioning and Performance

    CERN Document Server

    Hamilton, A

    2010-01-01

    The ATLAS trigger has been used very successfully to collect collision data during 2009 and 2010 LHC running at centre of mass energies of 900 GeV, 2.36 TeV, and 7 TeV. This paper presents the ongoing work to commission the ATLAS trigger with proton collisions, including an overview of the performance of the trigger based on extensive online running. We describe how the trigger has evolved with increasing LHC luminosity and give a brief overview of plans for forthcoming LHC running.

  5. Commission of energy regulation. 2004 activity report

    International Nuclear Information System (INIS)

    2004-01-01

    The commission of energy regulation (CRE) is an independent administrative authority in charge of the control of the operation of gas and electricity markets. This document is the fifth activity report of CRE and covers the July 1, 2003 - June 30, 2004 period, which corresponds to the era of opening of energy markets as a consequence of the enforcement of the June 26, 2003 European directive. In the framework of the stakes made by energy markets liberalization, this document presents the situation of the gas and electricity markets during this period (European framework, regulation of both markets, public utility mission..) and describes CRE's means for the monitoring of these markets. (J.S.)

  6. Nuclear Regulatory Commission: 1981 annual report

    International Nuclear Information System (INIS)

    1981-01-01

    This seventh annual report of the US Nuclear Regulatory Commission covers major actions, events and planning that occurred during fiscal year 1981, with some coverage of later events, where appropriate. Chapters of the report address the agency's various functions or areas of activity: regulating nuclear power plants; evaluating reactor operating experience; licensing nuclear materials and their transportation; safeguarding nuclear plants and materials; managing nuclear wastes; inspection and enforcement; cooperation with state governments; international activities; research and standards development; hearings; decisions and litigation; and administrative and public communications matters. Each chapter presents a detailed review of program accomplishments during the report period, fiscal year 1981

  7. Gentilly 2: design, construction and commissioning

    International Nuclear Information System (INIS)

    Amyot, Paul; Michel, Benoit.

    1982-06-01

    Construction of the Gentilly 2 power station is essentially complete, and commissioning is proceeding. The main activities during the 1981-82 period have been the completion of the construction and overall testing of the major systems. One cause of delay in the project in 1981 was the discovery of damage to the tubesheet of a steam generator. An internal manhole cover support in the steam generator head had become loose and had caused damage to the tube-to-tubesheet welds. Repairs to the welds were completed in Feb. 1982 after an extensive development program to qualify the welding procedure. Overall project life will be slightly more than 9 years

  8. Commissioning dosimetry at SINAGAMA irradiation facility

    International Nuclear Information System (INIS)

    Noriah Mod Ali; Hasan Sham; Taiman Kadni

    2000-01-01

    Dose mapping is one of the important factors in the commissioning of the irradiation plant. Comparison of the dose distribution obtained through the dose mapping exercise carried out since 1991 for Sinagama plant are described in this paper. It is aimed to confirmed the need for a thorough dose-mapping before the plant can be proceed with routine irradiation. The dose measurement was performed using a routine ceric-cerous dosimeter, supplied by the High Dose Dosimetry Laboratory, SSDL. The quality assurance of these service was maintain and verify through regular participation in dose intercomparison organised by the IAEA

  9. Commission 22: Meters, Meteorites and Interplanetary Dust

    Science.gov (United States)

    Watanabe, Junichi; Jenniskens, Peter; Spurný, Pavel; Borovička, Jiří; Campbell-Brown, Margaret; Consolmagno, Guy; Jopek, Tadeusz; Vaubaillon, Jeremie; Williams, Iwan P.; Zhu, Jin

    2010-05-01

    The business meeting of commission 22 was held at the room 5 in the SulAmerica Convention Center in Rio de Janeiro(14:00-15:30). Fifteen people attended at this meeting:J.Borovička, E.Bowell, G.Consolmagno, D.Green, P. Jenniskens, A. Pellinen-Wannberg, R. Rudawska, J. Watanabe, J. Zhu, P. H. A. Hasselmann, F. Ostroviski, D. A. Oszkiewicz, W. Thuillot, P. Mahajani, and A. Sule. This meeting was managed by Junichi Watanabe, the current C22 Vice-President. The summary of the meeting is described.

  10. Cognitive Enhancement and Beyond: Recommendations from the Bioethics Commission.

    Science.gov (United States)

    Allen, Anita L; Strand, Nicolle K

    2015-10-01

    Media outlets are reporting that cognitive enhancement is reaching epidemic levels, but evidence is lacking and ethical questions remain. The US Presidential Commission for the Study of Bioethical Issues (Bioethics Commission) has examined the issue, and we lay out the commission's findings and their relevance for the scientific community. Published by Elsevier Ltd.

  11. 77 FR 8095 - Technical Corrections to Commission Regulations

    Science.gov (United States)

    2012-02-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 2 [Docket No. RM11-30-000; Order No. 756] Technical Corrections to Commission Regulations Issued February 8, 2012. AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule: correcting amendment. SUMMARY: This document adds...

  12. 75 FR 73083 - Sunshine Act Meeting; Open Commission Meeting

    Science.gov (United States)

    2010-11-29

    ... FEDERAL COMMUNICATIONS COMMISSION Sunshine Act Meeting; Open Commission Meeting November 30, 2010. The Federal Communications Commission will hold an Open Meeting on the subjects listed below on... demonstrate accessibility technologies. The meeting site is fully accessible to people using wheelchairs or...

  13. Commission administration. National Low-Level Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1984-09-01

    This report is one in a series of commission option documents prepared for the US Department of Energy, designed to assist regional low-level waste compact commissions in their organization, administration and efforts to effectively manage waste within their regions. In particular, this report addresses topics related to commission administrative procedures, personnel, procurement and finance

  14. 47 CFR 0.420 - Other Commission publications.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Other Commission publications. 0.420 Section 0... Information Printed Publications § 0.420 Other Commission publications. The following additional Commission publications may be purchased from the Superintendent of Documents: (a) Statistics of Communications Common...

  15. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    Science.gov (United States)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  16. 76 FR 71449 - Reporting Line for the Commission's Ethics Counsel

    Science.gov (United States)

    2011-11-18

    ... Ethics Counsel AGENCY: Securities and Exchange Commission. ACTION: Final rule. SUMMARY: The Securities... of the Ethics Counsel is now a stand-alone Office of the Commission and that the head of the Office, the Ethics Counsel, reports directly to the Chairman of the Commission. DATES: Effective Date...

  17. Educational Change by Commission: Attempting "Trickle Down" Reform.

    Science.gov (United States)

    Ginsberg, Rick; Wimpelberg, Robert K.

    1987-01-01

    The processes and procedures of national commissions on education are discussed. Elements of commonality are presented with a review of competing explanations of the popularity of such commissions. A sociopolitical thesis of educational reform through commissions is advanced, based on the "trickle down" theory of economics. (SLD)

  18. 17 CFR 9.26 - Participation of Commission staff.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Participation of Commission staff. 9.26 Section 9.26 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES... Respect to Appeals § 9.26 Participation of Commission staff. Within twenty days after receipt of the...

  19. 76 FR 24383 - Commission's Rules of Practice, Procedure, and Organization

    Science.gov (United States)

    2011-05-02

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Parts 0 and 1 [GC Docket No. 10-44; FCC 11-16] Commission... docket management measures, such as broadening the use of docketed proceedings; expanding the requirement... effective date for FCC rules in the event the Commission does not specify an effective date in a rulemaking...

  20. 77 FR 58941 - Appeal Proceedings Before the Commission

    Science.gov (United States)

    2012-09-25

    ... forth more specific rules for the different types of appeals. Rules for appeals of ordinance..., 582, 583, 584, and 585 RIN 3141-AA47 Appeal Proceedings Before the Commission AGENCY: National Indian... Commission) promulgates this final rule to enhance and clarify appeal proceedings before the Commission. This...

  1. Report of the Nevada Commission on Nuclear Projects

    International Nuclear Information System (INIS)

    1986-11-01

    This summary represents the major conclusions reached by the Commission on Nuclear Projects. They reflect the Commission's experience with the high-level nuclear waste disposal program since 1985 and are the result of the Commission's scrutiny of both State and federal repository-related activities

  2. 78 FR 78352 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ14-4-000] Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No. 1000 Further Regional Compliance Filing to be effective...

  3. 76 FR 25685 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-05-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-000] Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to be effective 4/15/2011. Any person...

  4. 76 FR 35209 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-001] Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to Compliance Filing to be effective 4/15/2011. Any...

  5. 75 FR 37789 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2010-06-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ10-2-000] Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets for inclusion in its open access transmission...

  6. 76 FR 49469 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-08-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-15-000] Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA) \\1\\ and Part 35 of the Federal Energy Regulatory...

  7. Transforming public utility commissions in the new regulatory environment: Some issues and ideas for managing change

    Energy Technology Data Exchange (ETDEWEB)

    Wirick, D.W.; Davis, V.W.; Burns, R.E.; Jones, D.N.

    1996-07-01

    In the face of sweeping changes in utility markets and regulatory practices, public utility commissions are being forced to change in fundamental ways--to substantially transform themselves rather than to make only incremental changes in their operations. Managing this process of radical change is complicated by the fact that for the foreseeable future some portions of utility markets (e.g., water utilities) will function much as they have before. Some envision commissions in the future that are more externally focussed, that rely more on dispute resolution than adjudicatory proceedings, that concentrate on identifying and understanding competitive markets, that are more automated, and that are more likely to question old assumptions and definitions. This report identifies the considerations commissions might apply for identifying what mix of skills or fields of experise should compromise the technical staff. Factors are also identified which point towards a sectoral arrangement of staff and those factors which point toward a functional approach.

  8. Review of the Initial Phases of the LHC Power Converter Commissioning

    CERN Document Server

    Nisbet, D

    2008-01-01

    The LHC requires more than 1700 power converter systems that supply between 60A and 13kA of precisely regulated current to the superconducting magnets. For the first time at CERN these converters have been installed underground in close proximity to many other accelerator systems. In addition to the power converters themselves, many utilities such as air and water cooling, electrical power, communication networks and magnet safety systems needed to be installed and commissioned as a single system. Due to the complexity of installing and commissioning such a large infrastructure, with inevitable interaction between the different systems, a three phase test strategy was developed. The first phase comprised the manufacture, integration and reception tests of all converter sub-systems necessary for powering. The second phase covered the commissioning of all the power converters installed in their final environment with the utilities. The third phase will add the superconducting magnets and will not be covered by ...

  9. Leadership of healthcare commissioning networks in England: a mixed-methods study on clinical commissioning groups

    Science.gov (United States)

    Zachariadis, Markos; Oborn, Eivor; Barrett, Michael; Zollinger-Read, Paul

    2013-01-01

    Objective To explore the relational challenges for general practitioner (GP) leaders setting up new network-centric commissioning organisations in the recent health policy reform in England, we use innovation network theory to identify key network leadership practices that facilitate healthcare innovation. Design Mixed-method, multisite and case study research. Setting Six clinical commissioning groups and local clusters in the East of England area, covering in total 208 GPs and 1 662 000 population. Methods Semistructured interviews with 56 lead GPs, practice managers and staff from the local health authorities (primary care trusts, PCT) as well as various healthcare professionals; 21 observations of clinical commissioning group (CCG) board and executive meetings; electronic survey of 58 CCG board members (these included GPs, practice managers, PCT employees, nurses and patient representatives) and subsequent social network analysis. Main outcome measures Collaborative relationships between CCG board members and stakeholders from their healthcare network; clarifying the role of GPs as network leaders; strengths and areas for development of CCGs. Results Drawing upon innovation network theory provides unique insights of the CCG leaders’ activities in establishing best practices and introducing new clinical pathways. In this context we identified three network leadership roles: managing knowledge flows, managing network coherence and managing network stability. Knowledge sharing and effective collaboration among GPs enable network stability and the alignment of CCG objectives with those of the wider health system (network coherence). Even though activities varied between commissioning groups, collaborative initiatives were common. However, there was significant variation among CCGs around the level of engagement with providers, patients and local authorities. Locality (sub) groups played an important role because they linked commissioning decisions with

  10. 18 CFR 420.44 - Cooling water.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Cooling water. 420.44 Section 420.44 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Charges; Exemptions § 420.44 Cooling water. Water used...

  11. 78 FR 47241 - Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Revise the...

    Science.gov (United States)

    2013-08-05

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Revise the Human Health Water Quality Criteria for PCBs in Zones 2... hold a public hearing to receive comments on proposed amendments to the Commission's Water Quality...

  12. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    International Nuclear Information System (INIS)

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  13. Experience gained during commissioning and trial operation of Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    GaL, P.; Adamica, T.; Marosik, V.; Rehak, A.

    2000-01-01

    In this paper authors describe the experience gained during commissioning and trial operation of Mochovce NPP (EMO). The first year of EMO operation from the point of view of safety and reliability was successful. Evidently we were challenged with certain problems characteristic to this stage of operation which resulted in automatic reactor shutdown. There were 11 automatic shutdowns in 1998 by action of the quick emergency protection AO-1 and two manual shutdowns by the AO-1 key. In 1999, there were 6 automatic shutdowns by action of the quick emergency protection AO-1. Three of them was connected to the falsely activated binary signal of MCP switch of, in two cases the reason came out from the turbo-generator (TG) cooling water system. Very positive trend in the operation of both units shows the fact that during all commissioning period of the second unit there were only three automatic reactor shutdowns by the signal AO-1. All these actions were done in frame of commissioning tests. All causes which activated the automatic unit shutdowns were found out and rectified, the overall tuning of the cooling water system is on the process now. The solution of this problem is possible only power commissioning, and in the stage of the trial operation had no direct impacts on the nuclear, radiation, or technical safety respectively. In 1998 two events according to the INES scale after second unit commissioning because of two unit links of the cooling water system. The operational events during the commissioning tests, start-up tests, physical commissioning, were ranked the category 1 ('Action of SIS U040 p po <8,34 MPa at the system 2 and 3' and 'Breaching the L and C'). In 1999 only events occurred that were ranked in the category safety insignificant events and lower (category 0, or off the scale respectively). In the frame of the safety culture principles adopted, such as critical attitude, exact and careful approach, and communication, these problems were given the

  14. Translating landscape: the Colombian Chorographic Commission

    Directory of Open Access Journals (Sweden)

    Veronica Uribe Hanabergh

    2014-01-01

    Full Text Available In 1850 the Colombian government developed a project to survey the young country´s landscape. Scientists, writers, and artists were invited to make part of the project led by the Italian military, geographer and cartographer, Agustin Codazzi. After nine years and three different artists, the Commission had many watercolor drawings that portrayed a landscape, not only in its physical traits, but also in its social, economic and agricultural development. Through the lens of these artists, the drawings that concluded the survey showed a landscape that was truly original but that was also seen through the lens of a certain romantic eye inherited by a firm European legacy. As a result, these watercolors show the different regions, people, and means of transportation, crops and trades. The Colombian Chorographic Commission was an important project in the construction of the Colombian modern nation, a country that was constantly divided by federalist and centralist politics, liberal and conservative parties. An interesting union between science, politics and art, these drawings represent the process of the modernization of nineteenth-century Colombia.

  15. Acceptance, commissioning and quality control in radiosurgery

    International Nuclear Information System (INIS)

    Toreti, Dalila Luzia

    2009-01-01

    Stereotactic Radiosurgery is a treatment technique that uses narrow beams of radiation focused with great accuracy in a small lesion. The introduction of micro multi leaf collimators (mMLC) allows this technique to reach a higher degree of dose conformation of the target lesion allowing a smaller irradiation of critical structures and normal tissues. This paper presents the results of the acceptance tests and commissioning of a Varian 6EX linear accelerator dedicated to radiosurgery associated with the BrainLab micro multi leaf collimator installed in the Hospital das Clinicas da Faculdade de Medicina da USP (HC-FMUSP) and establish feasible quality assurance program for the services that employ this special technique. The results of the acceptance tests were satisfactory and are willing with the specifications provided by the manufacturer and the commissioning tests were within the international recommendations. The tests and measures that are part of quality control process should be specific to each treatment unit, and the need, frequency and levels of tolerance

  16. Chilean Nuclear Energy Commission dosimetric information system

    International Nuclear Information System (INIS)

    Guerrero Vallejos, Patricia Andrea

    1997-01-01

    This thesis discusses the nuclear radiation that people who work with radioactive material is exposed to and its control by the Chilean Nuclear Energy Commission. A full analysis of the System is presented with information about the Commission and the Department of Nuclear and Radiological Safety which runs the System. Ana analysis of the System is presented in order to obtain requirements. Management flow diagrams, the processes involved and current problems experienced by the users are described. A design logic is modeled producing Data Flow Diagrams (DFD). based on this physical design, or, Model of Physical Data, is prepared including tables, attributes, types of data, primary and foreign keys. A description is presented of how the System is implemented, the tools that are used and how the testing phase is carried out. The Dosimetry System meets the criteria for a Software Engineering project, where the basic cycle was used as a working methodology. The System developed supports the dosimetric control of people exposed to radioactive material. (author)

  17. Commissioning of research reactors. Safety guide

    International Nuclear Information System (INIS)

    2006-01-01

    The objective of this Safety Guide is to provide recommendations on meeting the requirements for the commissioning of research reactors on the basis of international best practices. Specifically, it provides recommendations on fulfilling the requirements established in paras 6.44 and 7.42-7.50 of International Atomic Energy Agency, Safety of Research Reactors, IAEA Safety Standards Series No. NS-R-4, IAEA, Vienna (2005) and guidance and specific and consequential recommendations relating to the recommendations presented in paras 615-621 of International Atomic Energy Agency, Safety in the Utilization and Modification of Research Reactors, Safety Series No. 35-G2, IAEA, Vienna (1994) and paras 228-229 of International Atomic Energy Agency, Safety Assessment of Research Reactors and Preparation of the Safety Analysis Report, Safety Series No. 35-G1, IAEA, Vienna (1994). This Safety Guide is intended for use by all organizations involved in commissioning for a research reactor, including the operating organization, the regulatory body and other organizations involved in the research reactor project

  18. Surrogacy: The experience of Greek commissioning women.

    Science.gov (United States)

    Papaligoura, Zaira; Papadatou, Danai; Bellali, Thalia

    2015-12-01

    Available studies on surrogacy are extremely limited. Findings suggest that surrogacy is experienced as problem free, with a significant number of commissioning mothers maintaining contact with the surrogates over time. To explore the experiences of Greek commissioning women regarding the surrogacy arrangement and birth of a child through surrogacy. The data of this study were collected from 7 intended mothers who had either a long history of infertility or serious health problems. Interviews were tape-recorded, transcribed and analysed employing content analysis. The analysis of the women's accounts revealed three themes: (a) a shared journey, (b) the birth of a long-awaited child, and (c) the surrogacy disclosure. The surrogacy process became the women's affairs, with their partners offering backstage support. A very close bond was developed with the surrogates, characterised by daily contacts and care-giving behaviours. While this bond was abruptly discontinued after the child's birth, it was interiorised with all participants being grateful to their surrogate. The timing and content of the surrogacy disclosure to family and child(ren) were carefully chosen by participants, who avoided providing information when egg donation was involved. Findings are reassuring for women who want to parent a child through a surrogate arrangement, and suggest that the availability of counselling services may help intended mothers to cope with disclosure issues. Copyright © 2015 Australian College of Midwives. Published by Elsevier Ltd. All rights reserved.

  19. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    L. Malgeri

    2011-01-01

    As the technical interventions were finishing up and services restored at P5 we started central operations again in 2011. We started operations with a reduced shift crew, Shift leader and DCS shifter, on 24th January. We had a first mid-week global run on 2nd and 3rd February followed by cosmic data-taking between 10th and 20th February. Due to delays with cooling for the strip tracker the useful cosmic data-taking with the strip tracker was reduced to about four days. On 20th February, the LHC started beam commissioning, and cosmic data-taking with the full CMS detector was stopped. The machine availability has been much higher during the 2011 beam commissioning than during the comparable time period in 2010. This has given us few opportunities to turn on the tracker for further cosmic data-taking. Many changes and upgrades were performed during the winter shutdown. Among them was an upgrade to running the central DAQ on 64 bit. All of these upgrades have now b...

  20. President's Commission and the normal accident

    International Nuclear Information System (INIS)

    Perrow, C.

    1982-01-01

    This chapter incorporates the major points of an analysis of the accident at Three Mile Island that I prepared in September 1979. In contrast to the findings of the President's Commission (1979), I did not view the accident as the result of operator error, an inept utility, or a negligent Nuclear Regulatory Commission but as a consequence of the complexity and interdependence that characterize the system itself. I argued that the accident was inevitable-that is, that it could not have been prevented, foreseen, or quickly terminated, because it was incomprehensible. It resembled other accidents in nuclear plants and in other high risk, complex and highly interdependent operator-machine systems; none of the accidents were caused by management or operator ineptness or by poor government regulation, though these characteristics existed and should have been expected. I maintained that the accident was normal, because in complex systems there are bound to be multiple faults that cannot be avoided by planning and that operators cannot immediately comprehend

  1. Linac4 chopper line commissioning strategy

    CERN Document Server

    Bellodi, G; Lombardi, A M; Posocco, P A; Sargsyan, E

    2010-01-01

    The report outlines the strategy for beam-based commissioning of the Linac4 3 MeV chopper line as currently scheduled to start in the second half of 2011 in the Test Stand Area. A dedicated temporary diagnostics test bench will complement the measurement devices foreseen for permanent installation in the chopper line. A commissioning procedure is set out as a series of consecutive phases, each one supposed to meet a well- defined milestone in the path to fully characterise the beam-line. Specific set-ups for each stage are defined in terms of beam characteristics, machine settings and diagnostics used. Operational guidelines are given and expected results at the relative points of measurements are shown for simulated scenarios (on the basis of multi-particle tracking studies carried out with the codes PATH and TRACEWin). These are then interpreted in the light of the resolution limits of the available diagnostics instruments to assess the precision reach on individual measurements and the feasibility of techn...

  2. PLEIADES-HR IMAGE QUALITY COMMISSIONING

    Directory of Open Access Journals (Sweden)

    L. Lebègue

    2012-07-01

    Full Text Available PLEIADES is the highest resolution civilian earth observing system ever developed in Europe. This imagery program is conducted by the French National Space Agency, CNES. It operates since 2012 a first satellite PLEIADES-HR launched on 2011 December 17th, a second one should be launched by the end of the year. Each satellite is designed to provide optical 70 cm resolution coloured images to civilian and defence users. The Image Quality requirements were defined from users studies from the different spatial imaging applications, taking into account the trade-off between on-board technological complexity and ground processing capacity. The assessment of the image quality and the calibration operation have been performed by CNES Image Quality team during the 6 month commissioning phase that followed the satellite launch. These activities cover many topics gathered in two families : radiometric and geometric image quality. The new capabilities offered by PLEIADES-HR agility allowed to imagine new methods of image calibration and performance assessment. Starting from an overview of the satellite characteristics, this paper presents all the calibration operations that were conducted during the commissioning phase and also gives the main results for every image quality performance.

  3. Validation Tools for ATLAS Muon Spectrometer Commissioning

    International Nuclear Information System (INIS)

    Benekos, N.Chr.; Dedes, G.; Laporte, J.F.; Nicolaidou, R.; Ouraou, A.

    2008-01-01

    The ATLAS Muon Spectrometer (MS), currently being installed at CERN, is designed to measure final state muons of 14 TeV proton-proton interactions at the Large Hadron Collider (LHC) with a good momentum resolution of 2-3% at 10-100 GeV/c and 10% at 1 TeV, taking into account the high level background enviroment, the inhomogeneous magnetic field, and the large size of the apparatus (24 m diameter by 44 m length). The MS layout of the ATLAS detector is made of a large toroidal magnet, arrays of high-pressure drift tubes for precise tracking and dedicated fast detectors for the first-level trigger, and is organized in eight Large and eight Small sectors. All the detectors of the barrel toroid have been installed and the commissioning has started with cosmic rays. In order to validate the MS performance using cosmic events, a Muon Commissioning Validation package has been developed and its results are presented in this paper. Integration with the rest of the ATLAS sub-detectors is now being done in the ATLAS cavern

  4. Safety of Nuclear Power Plants: Commissioning and Operation

    International Nuclear Information System (INIS)

    2011-01-01

    publication deals with the safe commissioning and operation of a nuclear power plant. It covers commissioning and operation up to the removal of nuclear fuel from the plant, including maintenance and modifications made throughout the lifetime of the plant. It covers the preparation for decommissioning but not the decommissioning phase itself. The publication also establishes additional requirements relating only to commissioning. Normal operation and anticipated operational occurrences as well as accident conditions are taken into account. This publication follows the relationship between principles and objectives for safety, and safety requirements and criteria. Section 2 elaborates on the safety objective and safety principles, which form the basis for deriving the safety requirements that must be met in the operation of a nuclear power plant. Sections 3-9 establish safety requirements under a series of individually numbered overarching requirements. Section 3 establishes the requirements to be applied for the management and organizational structure of the operating organization. Section 4 establishes the requirements for the management of operational safety, while Section 5 establishes the requirements for operational safety programmes. Section 6 establishes the requirements for plant commissioning. Section 7 establishes the requirements for plant operations. Section 8 establishes the requirements for maintenance, testing, surveillance and inspection. Section 9 establishes the requirements for preparation for decommissioning. The requirements are mainly applicable to water cooled reactors, but they may also be used as a basis for establishing specific requirements for other reactor designs.

  5. Report of the State of Nevada Commission on Nuclear Projects

    International Nuclear Information System (INIS)

    1990-12-01

    This third biennial Report of the Nevada Commission on Nuclear Projects has been prepared in fulfillment of the requirements of NRS 459.0092, which stipulates that the Commission shall report to the Governor and Legislature on any matter relating to radioactive waste disposal the Commission deems appropriate and advise and make recommendations on the policy of the State concerning nuclear waste disposal projects. Chapter One of the Report presents a brief overview of the Commission's functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposl issue since the last Commission Report was published in November, 1988. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and State nuclear waste program efforts

  6. Members of the Science and Technology Commission, Spanish Senate

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    Photo 01: (left to right) Mr Francisco Xabier Albistur, Senator; Mrs Mercedes Senen, Lawyer of the Commission; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Prof. Luciano Maiani, CERN Director-General, Mr Alonso Arroyo, President of the Commission, signing the VIP visitors' book; and Mr Adolfo Abejon, Senator. Photo 02: Mr Alonso Arroyo, President of the Commission, signing the VIP visitors' book. Photos 03, 04: Mr Ramon Antonio Socias, Second Vice-President of the Commission, signing the VIP visitors' book; and Mr Adolfo Abejon, Senator. Photo 05: Mr Francisco Xabier Albistur, Senator, signing the VIP visitors' book. Photo 06: Mrs Mercedes Senen, Lawyer of the Commission, signing the VIP visitors' book. Photo 07: (left to right) Mr Francisco Xabier Albistur, Senator; Prof. Juan Antonio Rubio, Education and Technology Transfer Division Leader; Prof. Luciano Maiani, CERN Director-General; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Mr Alonso Arroyo, President of the C...

  7. Truth Commissions, Education, and Positive Peace: An Analysis of Truth Commission Final Reports (1980-2015)

    Science.gov (United States)

    Paulson, Julia; Bellino, Michelle J.

    2017-01-01

    Transitional justice and education both occupy increasingly prominent space on the international peacebuilding agenda, though less is known about the ways they might reinforce one another to contribute towards peace. This paper presents a cross-national analysis of truth commission (TC) reports spanning 1980-2015, exploring the range of…

  8. Design, R&D and commissioning of EAST tungsten divertor

    Science.gov (United States)

    Yao, D. M.; Luo, G. N.; Zhou, Z. B.; Cao, L.; Li, Q.; Wang, W. J.; Li, L.; Qin, S. G.; Shi, Y. L.; Liu, G. H.; Li, J. G.

    2016-02-01

    After commissioning in 2005, the EAST superconducting tokamak had been operated with its water cooled divertors for eight campaigns up to 2012, employing graphite as plasma facing material. With increase in heating power over 20 MW in recent years, the heat flux going to the divertors rises rapidly over 10 MW m-2 for steady state operation. To accommodate the rapid increasing heat load in EAST, the bolting graphite tile divertor must be upgraded. An ITER-like tungsten (W) divertor has been designed and developed; and firstly used for the upper divertor of EAST. The EAST upper W divertor is modular structure with 80 modules in total. Eighty sets of W/Cu plasma-facing components (PFC) with each set consisting of an outer vertical target (OVT), an inner vertical target (IVT) and a DOME, are attached to 80 stainless steel cassette bodies (CB) by pins. The monoblock W/Cu-PFCs have been developed for the strike points of both OVT and IVT, and the flat type W/Cu-PFCs for the DOME and the baffle parts of both OVT and IVT, employing so-called hot isostatic pressing (HIP) technology for tungsten to CuCrZr heat sink bonding, and electron beam welding for CuCrZr to CuCrZr and CuCrZr to other material bonding. Both monoblock and flat type PFC mockups passed high heat flux (HHF) testing by means of electron beam facilities. The 80 divertor modules were installed in EAST in 2014 and results of the first commissioning are presented in this paper.

  9. Resolution 928/003 it founds a commission with determined integration, with the proposal to do a project about hydrocarbons framework regulations

    International Nuclear Information System (INIS)

    2003-01-01

    It is proposed the formation of a commission composed of representatives of the Ministry of Energy and Mining Industry, Regulatory Unit of Energy Services and Water and the National Fuel Alcohol and Portland.

  10. Commissioning a Megawatt-class Gyrotron with Collector Potential Depression

    Science.gov (United States)

    Lohr, J.; Cengher, M.; Gorelov, Y. A.; Ponce, D.; Prater, R.

    2013-10-01

    A 110 GHz depressed collector gyrotron has been installed on the DIII-D tokamak. The commissioning process rapidly achieved operation at full parameters, 45 A and 94 kV total voltage, with 29 kV depression. Although short pulse, 2 ms, factory testing demonstrated 1.2 MW at 41% electrical efficiency, long pulse testing at DIII-D achieved only 33% efficiency at full power parameters, for pulse lengths up to 10 s. Maximum generated power was ~950 kW, considerably below the 1.2 MW target. During attempts to increase the power at 5 s pulse length, it was noted that the collector cooling water was boiling. This led to the discovery that 14 of the 160 cooling channels in the collector had been blocked by braze material during manufacture of the tube. The locations of blocked channels were identified using infrared imaging of the outside of the collector during rapid changes in the cooling water temperature. Despite these difficulties, the rf beam itself was of very high quality and the stray rf found calorimetrically in the Matching Optics Unit, which couples the Gaussian rf beam to the waveguide, was only 2% of the generated power, about half that of our previous best quality high power beam. Details of the power measurements and collector observations will be presented. Work supported by the US DOE under DE-FC02-04ER54698.

  11. Division B Commission 6: Astronomical Telegrams

    Science.gov (United States)

    Yamaoka, H.; Green, D. W. E.; Samus, N. N.; Aksnes, K.; Gilmore, A. C.; Nakano, S.; Sphar, T.; Tichá, J.; Williams, G. V.

    2016-04-01

    IAU Commission 6 ``Astronomical Telegrams'' had a single business meeting during Honolulu General Assembly of the IAU. It took place on Tuesday, 11 August 2015. The meeting was attended by Hitoshi Yamaoka (President), Daniel Green (Director of the Central Bureau for Astronomical Telegrams, CBAT, via Skype), Steven Chesley (JPL), Paul Chodas (JPL), Alan Gilmore (Canterbury University), Shinjiro Kouzuma (Chukyo University), Paolo Mazzali (Co-Chair of the Supernova Working Group), Elena Pian (Scuola Normale Superiore di Pisa), Marion Schmitz (chair IAU Working Group Designations + NED), David Tholen (University of Hawaii), Jana Ticha (Klet Observatory), Milos Tichy (Klet Observatory), Giovanni Valsecchi (INAF\\slash Italy), Gareth Williams (Minor Planet Center). Apologies: Nikolai Samus (General Catalogue of Variable Stars, GCVS).

  12. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Document Server

    D. Acosta

    Run coordination and DPG The activities of the DPGs in the last six months have included the completion of publications (and many internal notes) on the data collected during CRAFT08 exercise, continuation of these studies with CRAFT09 data, and finally the first workflows and prompt feedback on 2009 LHC beam data. The level of readiness of the DPG prompt feedback groups is quite high, as first results from the early November “beam splash” data were shown to CMS within 24 hours of the first LHC beam. Moreover, results from the first collisions at 900 GeV were presented publicly three days afterward on November 26th. The CRAFT09 cosmic data taking period provided an opportunity to commission the calibration and alignment workflows on large data samples using the same software release series intended for the first LHC data, and to demonstrate routine operation of alignment and calibration workflows under production conditions. Significantly, the "prompt calibration loop" wa...

  13. QPS Upgrade and Re-commissioning

    CERN Document Server

    Denz, R

    2009-01-01

    Prior to the re-start of the Large Hadron Collider LHC in 2009 the protection system for superconducting devices QPS will be submitted to a substantial upgrade. The foreseen modifications will enhance the capability of the system in detecting problems related to the electrical interconnections between superconducting magnets as well as the detection of so-called aperture symmetric quenches in the LHC main magnets. The presentation will describe the design and implementation of the new protection layers and report on recent tests with prototype devices. It will address as well the planned steps for commissioning of the new system, possible limitations and the additional tools and procedures required to make use of its full capability. Finally the recent progress with respect to procurement, production, test and installation will be presented.

  14. Open Letter to the European Commission

    DEFF Research Database (Denmark)

    Savin, Andrej; Schwemer, Sebastian Felix

    2016-01-01

    to the information society. A key component of this acquis is the prohibition of general monitoring obligations to the benefit of providers of intermediary services. It is a means to achieve at least two central objectives: the encouragement of innovation as well as the protection of fundamental rights of all...... Internet users, namely the rights protected by Articles 8 and 11 of the European Convention of Human Rights. Yet, the proposed Copyright Directive, in particular, seems to negatively affect both the domain and effect of Article 15 of the E-commerce Directive. The signatories of this open letter therefore...... urge the European Commission to take into account the human rights dimension of Article 15 of the E-commerce Directive, as made explicit by the Court of the Justice of the European Union, and to make sure its implications are carefully examined across sectors. Authors: Sophie Stalla-Bourdillon Eleonora...

  15. ARIEL e-LINAC: Commissioning and Development

    Science.gov (United States)

    Laxdal, R. E.; Zvyagintsev, V.

    2016-09-01

    A superconducting electron Linac (e-Linac) will be a part of the ARIEL facility for the production of radioactive ion beams (RIB) at TRIUMF. The e-Linac will consist of five 1.3GHz 9-cell cavities in three cryomodules delivering a 50MeV 10mA beam. The baseline operation will be single pass but a re-circulating ring is planned to allow either energy boost or energy recovery operation. The first stage of the accelerator which consists of two cryomodules has been successfully commissioned in 2014. The paper will discuss the superconducting radio-frequency (SRF) challenges of the accelerator. Cavities, crymodules and RF system design, preparation, and performance will be presented.

  16. Commissioning the CMS alignment and calibration framework

    International Nuclear Information System (INIS)

    Futyan, David

    2010-01-01

    The CMS experiment has developed a powerful framework to ensure the precise and prompt alignment and calibration of its components, which is a major prerequisite to achieve the optimal performance for physics analysis. The prompt alignment and calibration strategy harnesses computing resources both at the Tier-0 site and the CERN Analysis Facility (CAF) to ensure fast turnaround for updating the corresponding database payloads. An essential element is the creation of dedicated data streams concentrating the specific event information required by the various alignment and calibration workflows. The resulting low latency is required for feeding the resulting constants into the prompt reconstruction process, which is essential for achieving swift physics analysis of the LHC data. This report discusses the implementation and the computational aspects of the alignment and calibration framework. Recent commissioning campaigns with cosmic muons, beam halo and simulated data have been used to gain detailed experience with this framework, and results of this validation are reported.

  17. Commissioning the CMS Alignment and Calibration Framework

    CERN Document Server

    Futyan, David

    2009-01-01

    The CMS experiment has developed a powerful framework to ensure the precise and prompt alignment and calibration of its components, which is a major prerequisite to achieve the optimal performance for physics analysis. The prompt alignment and calibration strategy harnesses computing resources both at the Tier-0 site and the CERN Analysis Facility (CAF) to ensure fast turnaround for updating the corresponding database payloads. An essential element is the creation of dedicated data streams concentrating the specific event information required by the various alignment and calibration workflows. The resulting low latency is required for feeding the resulting constants into the prompt reconstruction process, which is essential for achieving swift physics analysis of the LHC data. This report discusses the implementation and the computational aspects of the alignment and calibration framework. Recent commissioning campaigns with cosmic muons, beam halo and simulated data have been used to gain detailed experience...

  18. The commissioning of the BRISOL facility

    Energy Technology Data Exchange (ETDEWEB)

    Tang, B., E-mail: tangb364@126.com; Cui, B.; Chen, L.; Huang, Q.; Ma, R.; Ma, Y.; Ma, X.; Zhang, T.; Jiang, W.

    2016-06-01

    The Beijing Radioactive ion beam facility Isotope Separator On-Line (BRISOL) is a radioactive ion beam facility based on a 100 MeV cyclotron providing 100 μA proton beam bombarding a thick target to produce radioactive nuclei, which are transferred into an ion source to produce a singly-charged ion beam. The construction and installation of BRISOL was completed in March 2014. The commissioning of the BRISOL facility with stable beams has been carried out in the last year. The ion source, the separator and the beam-line were tested with a {sup 39}K{sup +} stable beam. The tests and the current status of the BRISOL facility will be presented in this paper.

  19. ARIEL e-LINAC: Commissioning and Development

    International Nuclear Information System (INIS)

    Laxdal, R.E.; Zvyagintsev, V.

    2016-01-01

    A superconducting electron Linac (e-Linac) will be a part of the ARIEL facility for the production of radioactive ion beams (RIB) at TRIUMF. The e-Linac will consist of five 1.3GHz 9-cell cavities in three cryomodules delivering a 50MeV 10mA beam. The baseline operation will be single pass but a re-circulating ring is planned to allow either energy boost or energy recovery operation. The first stage of the accelerator which consists of two cryomodules has been successfully commissioned in 2014. The paper will discuss the superconducting radio-frequency (SRF) challenges of the accelerator. Cavities, crymodules and RF system design, preparation, and performance will be presented. (paper)

  20. Commissioning results of the HZB quadrupole resonator

    CERN Document Server

    Kleindienst, Raphael; Knobloch, Jens; Kugeler, Oliver

    2015-01-01

    Recent cavity results with niobium have demonstrated the necessity of a good understanding of both the BCS and residual resistance. For a complete picture and comparison with theory, it is essential that one can measure the RF properties as a function of field, temperature, frequency and ambient magnetic field. Standard cavity measurements are limited in their ability to change all parameters freely and in a controlled manner. On the other hand, most sample measurement setups operate at fairly high frequency, where the surface resistance is always BCS dominated. The quadrupole resonator, originally developed at CERN, is ideally suited for characterization of samples at typical cavity RF frequencies. We report on a modified version of the QPR with improved RF figures of merit for high-field operation. Experimental challenges in the commissioning run and alternate designs for simpler sample changes are shown alongside measurement results of a large grain niobium sample.

  1. Advanced photoinjector experiment photogun commissioning results

    Directory of Open Access Journals (Sweden)

    F. Sannibale

    2012-10-01

    Full Text Available The Advanced Photoinjector Experiment (APEX at the Lawrence Berkeley National Laboratory is dedicated to the development of a high-brightness high-repetition rate (MHz-class electron injector for x-ray free-electron laser (FEL and other applications where high repetition rates and high brightness are simultaneously required. The injector is based on a new concept rf gun utilizing a normal-conducting (NC cavity resonating in the VHF band at 186 MHz, and operating in continuous wave (cw mode in conjunction with high quantum efficiency photocathodes capable of delivering the required charge at MHz repetition rates with available laser technology. The APEX activities are staged in three phases. In phase 0, the NC cw gun is built and tested to demonstrate the major milestones to validate the gun design and performance. Also, starting in phase 0 and continuing in phase I, different photocathodes are tested at the gun energy and at full repetition rate for validating candidate materials to operate in a high-repetition rate FEL. In phase II, a room-temperature pulsed linac is added for accelerating the beam at several tens of MeV to reduce space charge effects and allow the measurement of the brightness of the beam from the gun when integrated in an injector scheme. The installation of the phase 0 beam line and the commissioning of the VHF gun are completed, phase I components are under fabrication, and initial design and specification of components and layout for phase II are under way. This paper presents the phase 0 commissioning results with emphasis on the experimental milestones that have successfully demonstrated the APEX gun capability of operating at the required performance.

  2. Phase C commissioning-Cernavoda Unit 2

    International Nuclear Information System (INIS)

    Munro, Robert

    2007-01-01

    Phase C commissioning program includes over 500 individual tests and checks which are carefully planned and scheduled at the correct power level. Some of the major tests are the following: - heat transport thermosyphoning test at 3% Full Power (FP); - dual computer failure test at 15% FP; - turbine overspeed test and generator first synchronization; - load rejection tests at 25, 50, 75 and 100% FP; - loss of Class IV Power test at 25% FP; - shutdown system (SDS nr. 1 and SDS nr. 2) tests at >60% FP; - condensate extraction and boiler feedwater pump trip tests at 100% FP; - power cycling through reactor setback from 100 to 10 and back to 100% FP; - condenser steam discharge valve tests with reactor at 100% FP and turbine at 60% output; - low pressure and high pressure heater box-up tests at 100% FP. Progress through the Phase C program is controlled at six specific Commissioning Control Points (CCPs) which meet the Romanian Regulatory Authority (CNCAN) and Management requirements. These CCPs are the following: PI - Approval for Power increase to 5% FP; PP1 - Approval for Power increase to 25% FP; PP2 - Approval for Power increase to 50% FP; PP3 - Approval for Power increase to 75% FP; PP4 - Approval for Power increase to 100% FP. Prior to releasing each of these CCPs both Management and CNCAN complete an assessment of the 'Readiness' to proceed to the next power plateau. The readiness includes a review of the plant material condition, results of previous tests, documentation status, and operability maintainability issues. (author)

  3. British Columbia Utilities Commission 2001 annual report

    International Nuclear Information System (INIS)

    2002-06-01

    The main responsibility of the British Columbia Utilities Commission is to regulate energy utilities under its jurisdiction to ensure that energy rates are fair and that utility operators in the province provide safe, adequate and secure service to their customers. The Commission also approves the construction of new facilities planned by utilities. It also participates in the review of utility and energy projects under the Environmental Assessment Act. Several successes were achieved in 2001 as the utility implemented its first performance plan. Oral public hearings were held for applications by Pacific Northern Gas and by Pembina Pipelines, owners of the common carrier oil pipeline from Taylor to Kamloops. A review of BC Gas' rate design to apportion utility revenue requirements fairly to different classes of customers was successfully achieved by a negotiated settlement process. In 2001, there was also a high level of proposed mergers, acquisitions and divestitures. Duke Energy Corporation's share acquisition of Westcoast Energy's two affiliated gas utilities was approved. BC Gas' application to divest its customer care activities to a joint venture company with Enbridge was also reviewed, and an oral hearing was held to review a West Kootenay Power application to sell its Kootenay River hydroelectric generation assets to Columbia Basin Trust and the Columbia Power Corp. In this case, the decision rendered was that the sale terms had to be changed so that customers could share the proceeds. The utility therefore, decided not to proceed with the sale under these conditions. The BC Hydro legislated rate freeze, which was due to expire on September 30, 2001, was extended for an additional 18 months to allow the new provincial government time to implement a new energy policy. The new energy policy is expected to give the province an energy advantage by facilitating growth and diversification in energy production while providing competition and more choice for

  4. Qinshan CANDU commissioning - a successful partnership

    International Nuclear Information System (INIS)

    Alikhan, S.; Thomson, J.; Jun, G.; Guoyuan, J.

    2004-01-01

    The Qinshan CANDU Nuclear Power Plant consists of 2 x 728 MWe CANDU 6 units, built in Zhejiang Province, China, by the Third Qinshan Nuclear Power Company (TQNPC) as the owner and Atomic Energy of Canada Limited (AECL) as the main contractor. The Contract between China National Nuclear Corporation (CNNC) and AECL was signed in November 1996 and became effective on February 12, 1997 with scheduled completion dates of February 12, 2003 for Unit 1 and November 12, 2003 for Unit 2. Unit 1 was declared in-service on December 31, 2002, 43 days ahead of schedule and Unit 2 was declared in service on July 20, 2003, 115 days ahead of schedule. The successful partnership between AECL, Bechtel, Hitachi and TQNPC working as a team is the key to this success. Total commissioning period from first energization of the system service transformer to in-service for both units was 20.7 months, which is significantly better than the experience at other comparable CANDU 6 units. It has clearly demonstrated the benefits of building two units together, about 6 months apart, to achieve optimum utilization of resources already mobilized for the first unit; the second unit is commissioned with less than 40% of the effort required for the first unit. Since in-service to the end of March 2004, Unit 1 has operated at a gross capacity factor of 93% and Unit 2 at 82.5%, including loss of production for one month in August 2003 to repair the failure of turbine LP blades tie-wire. (author)

  5. Advanced photoinjector experiment photogun commissioning results

    Science.gov (United States)

    Sannibale, F.; Filippetto, D.; Papadopoulos, C. F.; Staples, J.; Wells, R.; Bailey, B.; Baptiste, K.; Corlett, J.; Cork, C.; De Santis, S.; Dimaggio, S.; Doolittle, L.; Doyle, J.; Feng, J.; Garcia Quintas, D.; Huang, G.; Huang, H.; Kramasz, T.; Kwiatkowski, S.; Lellinger, R.; Moroz, V.; Norum, W. E.; Padmore, H.; Pappas, C.; Portmann, G.; Vecchione, T.; Vinco, M.; Zolotorev, M.; Zucca, F.

    2012-10-01

    The Advanced Photoinjector Experiment (APEX) at the Lawrence Berkeley National Laboratory is dedicated to the development of a high-brightness high-repetition rate (MHz-class) electron injector for x-ray free-electron laser (FEL) and other applications where high repetition rates and high brightness are simultaneously required. The injector is based on a new concept rf gun utilizing a normal-conducting (NC) cavity resonating in the VHF band at 186 MHz, and operating in continuous wave (cw) mode in conjunction with high quantum efficiency photocathodes capable of delivering the required charge at MHz repetition rates with available laser technology. The APEX activities are staged in three phases. In phase 0, the NC cw gun is built and tested to demonstrate the major milestones to validate the gun design and performance. Also, starting in phase 0 and continuing in phase I, different photocathodes are tested at the gun energy and at full repetition rate for validating candidate materials to operate in a high-repetition rate FEL. In phase II, a room-temperature pulsed linac is added for accelerating the beam at several tens of MeV to reduce space charge effects and allow the measurement of the brightness of the beam from the gun when integrated in an injector scheme. The installation of the phase 0 beam line and the commissioning of the VHF gun are completed, phase I components are under fabrication, and initial design and specification of components and layout for phase II are under way. This paper presents the phase 0 commissioning results with emphasis on the experimental milestones that have successfully demonstrated the APEX gun capability of operating at the required performance.

  6. Preparation of physics commissioning of Mochovce units 3 and 4

    International Nuclear Information System (INIS)

    Sedlacek, M.; Chrapciak, V.

    2010-01-01

    The Project 'Mochovce Units 3 and 4 Completion' started in 2009 and it will be finished in 2013. VUJE, Inc. is one of the five main Project contractors for the Nuclear Island and it is responsible, inter alia, for Mochovce Units 3 and 4 commissioning. The commissioning of Units 3 and 4 includes the stages of Physics Commissioning and Power Commissioning. This paper deals with the preparation of Mochovce Units 3 and 4 Physics Commissioning. In the paper there is presented a preparation of some commissioning documents, e.g. 'Quality Assurance Programme', 'Commissioning Programme', 'Stage Programme for Physics Commissioning', 'Test working programmes', 'Neutron-physics characteristics for Physics and Power Commissioning', etc. The scope of Physics Commissioning is presented by list of tests. For assessment of tests results so-called three-level acceptance criteria will be applied: realization, design and safety criteria. In the paper there are also presented computer codes, which will be used for neutron-physics characteristics calculation and the fuel loading scheme for the reactor core of Mochovce Unit 3. (Authors)

  7. Commissioning and Operational Experience in Power Reactor Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Pradhan, S., E-mail: spradhan@barctara.gov.in [Tarapur Based Reprocessing Plant, Bhabha Atomic Research Centre, Tarapur (India)

    2014-10-15

    After completing design, construction, commissioning, operation and maintenance experience of the reprocessing plants at Tarapur, Mumbai and Kalpakkam a new reprocessing plant is commissioned and put into operation at BARC, Tarapur since 2011. Subsequent to construction clearance, commissioning of the plant is taken in many steps with simultaneous review by design and safety committees. In spite of vast experience, all the staff was retrained in various aspects of process and utility operations and in operation of innovative changes incorporated in the design. Operating personnel are licensed through an elaborate procedure consisting of various check lists followed by personnel interview. Commissioning systems were divided in sub-systems. Sub-systems were commissioned independently and later integrated testing was carried out. For commissioning, extreme operating conditions were identified in consultation with designers and detailed commissioning procedures were made accordingly. Commissioning was done in different conditions to ensure safety, smooth operation and maintainability. Few modifications were carried out based on commissioning experience. Technical specifications for operation of the plant are made in consultation with designers and reviewed by safety committees. Operation of the plant was carried out after successful commissioning trials with Deep Depleted Uranium (DDU). Emergency operating procedures for each design basis accident were made. Performance of various systems, subsystems are quite satisfactory and the plant has given very good capacity factor. (author)

  8. Horizontal mergers and weak and strong competition commissions

    Directory of Open Access Journals (Sweden)

    Ristić Bojan

    2014-01-01

    Full Text Available In this paper we analyse the horizontal merger of companies in an already concentrated industry. The participants in mergers are obliged to submit notification to the Competition Commission but they also have the option of rejecting the merger. At the time of the notification submission the participants do not know whether the Commission is strong or weak, and they can complain to the Court if the Commission prohibits the merger. We model the strategic interaction between Participants and Commission in a dynamic game of incomplete information and determine weak perfect Bayesian equilibria. The main finding of our paper is that Participants will base their decision to submit notification on their belief in a weak Commission decision and will almost completely ignore the possibility of a strong Commission decision. We also provide a detailed examination of one case from Serbian regulatory practice, which coincides with the results of our game theoretical model.

  9. Survey on the virtual commissioning of manufacturing systems

    Directory of Open Access Journals (Sweden)

    Chi G. Lee

    2014-07-01

    Full Text Available This paper reviews and identifies issues in the application of virtual commissioning technology for automated manufacturing systems. While the real commissioning of a manufacturing system involves a real plant system and a real controller, the virtual commissioning deals with a virtual plant model and a real controller. The expected benefits of virtual commissioning are the reduction of debugging and correction efforts during the subsequent real commissioning stage. However, it requires a virtual plant model and hence still requires significant amount time and efforts. Two main issues are identified, the physical model construction of a virtual device, and the logical model construction of a virtual device. This paper reviews the current literature related to the two issues and proposes future research directions to achieve the full utilization of virtual commissioning technology.

  10. 1990 Recommendations of the International Commission on Radiological Protection adopted by the Commission in November 1990

    International Nuclear Information System (INIS)

    1991-01-01

    This publication represents a completely new set of basic recommendations, outdating ICRP Publication 26. They aim to: a) take account of new biological information and of trends in setting safety standards; b) improve the presentation of the recommendations: c) maintain as much stability in the recommendations as is consistent with the new information. The recommendations cover quantities, biological aspects, the conceptual framework of radiological protection, proposed and continuing practices (occupational, medical and public exposure) and implementation of the Commission's Recommendations. (UK)

  11. Report by the Nuclear Liability Commission

    International Nuclear Information System (INIS)

    2003-01-01

    The Nuclear Liability Commission set up by the Ministry of Trade and Industry was to find out whether the basic principles of Finland's current nuclear liability system are appropriate and well functioning and what changes should be made to the present system, taking into account Finland's position in the European convention system (Paris and Brussels Conventions). No proposal in the form of a bill was expected of the Commission. The Finnish nuclear liability system would be further developed as part of the international convention system so that the negotiated amendments to the conventions would be enforced in Finland as soon as possible after the final adoption of the convention texts. The Nuclear Liability Act would be amended so that the principle of unlimited liability of the nuclear installation operator would be adopted instead of the principle of limited liability. The unlimited liability should be covered by an insurance limited in amount so that the installation operator must take out an insurance of at least euro 700 million to cover the injured parties. The liability of the host State would be extended to cover damages exceeding the amount subject to the liability to take out an insurance referred to above by euro 500 million. The international compensation community would cover damages exceeding euro 1.2 billion by no more than euro 300 million. In this case a total of euro 1.5 billion should be compensated from the liability insurance of the installation operator and on the basis of the liability obligation of the host State and compensation community. Later, within the limits of the insurance capacity available, the liability to take out an insurance could be increased to euro 1.2 billion by gradually raising the limit so as to finally also cover fully the share of euro 500 million of the host State referred to above. As for appeal times, the Nuclear Liability Act would be amended so that the appeal time of personal damages would be prolonged. The

  12. Israel Atomic Energy Commission 1997 Annual Report

    International Nuclear Information System (INIS)

    1997-01-01

    The 1997 Annual Report is published in a special year for Israel, marking the 50th anniversary of its independece and statehood. From its inception, and the election of a distinguished scientist as its first president, Israel has regarded science and technology as a central pillar for future AEC development and a lever for improved quality of life of its people. The Israel Atomic Energy Commission, which will be celebrating its own anniversary in a few years, has made a modest but significant contribution to the establishment and growth of the technological infrastructure of the country. The first article in this Annual Report focuses attention on yet another aspect of our continuing investigation of the basic properties of technologically interesting and important materials, presented in our 1994 and 1996 Annual Reports. The current entry describes an application of the nuclear Time Differential Perturbed Angular Correlation technique to the study of the structure and properties of metal-hydrogen compounds, of potential interest within the framework of future, environmentally attractive hydrogen-burning energy systems, and in fusion power reactors. The second article also relates to some basic aspects of nuclear fusion. A theoretical study of the behavior and properties of laser-generated hot plasmas resulted in the proposal of a new confinement scheme, in which a plasma generated by circularly polarized laser light is confined in a miniature magnetic bottle created by magnetic fields induced in the plasma by the same light. The paper discusses the conditions under which such confinement and ensuing energy gain may be achieved. Measurements of actual axial magnetic fields generated in plasma by intense circularly polarized laser light are also reported. The third report describes one of our ongoing efforts to improve and streamline the techniques and procedures used in medical applications of radioisotopes. Replacement of the customary )311 solutions for

  13. Israel Atomic Energy Commission 1997 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The 1997 Annual Report is published in a special year for Israel, marking the 50th anniversary of its independece and statehood. From its inception, and the election of a distinguished scientist as its first president, Israel has regarded science and technology as a central pillar for future AEC development and a lever for improved quality of life of its people. The Israel Atomic Energy Commission, which will be celebrating its own anniversary in a few years, has made a modest but significant contribution to the establishment and growth of the technological infrastructure of the country. The first article in this Annual Report focuses attention on yet another aspect of our continuing investigation of the basic properties of technologically interesting and important materials, presented in our 1994 and 1996 Annual Reports. The current entry describes an application of the nuclear Time Differential Perturbed Angular Correlation technique to the study of the structure and properties of metal-hydrogen compounds, of potential interest within the framework of future, environmentally attractive hydrogen-burning energy systems, and in fusion power reactors. The second article also relates to some basic aspects of nuclear fusion. A theoretical study of the behavior and properties of laser-generated hot plasmas resulted in the proposal of a new confinement scheme, in which a plasma generated by circularly polarized laser light is confined in a miniature magnetic bottle created by magnetic fields induced in the plasma by the same light. The paper discusses the conditions under which such confinement and ensuing energy gain may be achieved. Measurements of actual axial magnetic fields generated in plasma by intense circularly polarized laser light are also reported. The third report describes one of our ongoing efforts to improve and streamline the techniques and procedures used in medical applications of radioisotopes. Replacement of the customary 311 solutions for

  14. 18 CFR 801.6 - Water supply.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Water supply. 801.6... POLICIES § 801.6 Water supply. (a) The Susquehanna River Basin is rich in water resources. With proper... forth in the comprehensive plan. (c) The Commission shall study the basin's water supply needs, the...

  15. Nine centuries waiting: The experiences of Iranians surrogacy commissioning mothers

    OpenAIRE

    Zandi, Mitra; Vanaki, Zohreh; Shiva, Marziyeh; Mohammadi, Eesa

    2014-01-01

    Background: There are a few studies about commissioning mothers’ understanding from the surrogacy during 9 months of waiting for delivery in Iran and other countries. This study was conducted with an aim to explore and explain the nature of concerns (experiences) of commissioning mothers. Materials and Methods: A qualitative design with a conventional content analysis approach was used to gather and analyze the experiences of commissioning mothers. They were selected from Royan Research Centr...

  16. Radiological emergency preparedness arrangements in the European Commission

    International Nuclear Information System (INIS)

    Tanner, V.

    2002-01-01

    The purpose of this paper is to give an overview of the different procedures established within the European Commission, which are relevant to radiological emergency planning and response. Although emergency preparedness is a national responsibility within the European Union, the Commission has clearly defined operational tasks in terms of emergency information exchange and community foodstuff regulations. In addition the Commission promotes research programmes and training courses in the field

  17. Should diabetes be commissioned through multidisciplinary networks, rather than Practice Based Commissioning?

    Science.gov (United States)

    Simmons, David; English, Patrick; Robins, Peter; Craig, Andrew; Addicott, Rachael

    2011-04-01

    Diabetes is recognized as a complex, long term, largely asymptomatic condition requiring self management skills, a range of health care professionals and articulated health services. Diabetes Networks have been introduced to provide guidance from people with diabetes and local health professionals with different skills to ensure that diabetes care is well organized, sustainable and delivers quality care. We have considered the role of Diabetes Networks in the English setting. Drawing on studies of health service organization and health policy, we describe the context in which diabetes commissioning is currently occurring in England, the role of Diabetes Networks and key components for an effective Diabetes Network. We have identified that Diabetes Networks are not currently mandatory and discovered policy approaches that are likely to work against safe, timely, integrated approaches to diabetes services with potentially harmful impacts on people with diabetes in the future. Practice Based Commissioning, where it sidelines Diabetes Networks, is a particular concern. We have identified key components of Diabetes Networks including explicit frameworks for leadership, membership, funding, decision making, communication and action. Diabetes is a condition requiring collaboration between all involved. Diabetes Networks include patients and all relevant health professionals and should dictate what and how diabetes care should be commissioned within the local health economy. Copyright © 2010 Primary Care Diabetes Europe. Published by Elsevier Ltd. All rights reserved.

  18. SU-E-T-577: Commissioning of a Deterministic Algorithm for External Photon Beams

    International Nuclear Information System (INIS)

    Zhu, T; Finlay, J; Mesina, C; Liu, H

    2014-01-01

    Purpose: We report commissioning results for a deterministic algorithm for external photon beam treatment planning. A deterministic algorithm solves the radiation transport equations directly using a finite difference method, thus improve the accuracy of dose calculation, particularly under heterogeneous conditions with results similar to that of Monte Carlo (MC) simulation. Methods: Commissioning data for photon energies 6 – 15 MV includes the percentage depth dose (PDD) measured at SSD = 90 cm and output ratio in water (Spc), both normalized to 10 cm depth, for field sizes between 2 and 40 cm and depths between 0 and 40 cm. Off-axis ratio (OAR) for the same set of field sizes was used at 5 depths (dmax, 5, 10, 20, 30 cm). The final model was compared with the commissioning data as well as additional benchmark data. The benchmark data includes dose per MU determined for 17 points for SSD between 80 and 110 cm, depth between 5 and 20 cm, and lateral offset of up to 16.5 cm. Relative comparisons were made in a heterogeneous phantom made of cork and solid water. Results: Compared to the commissioning beam data, the agreement are generally better than 2% with large errors (up to 13%) observed in the buildup regions of the FDD and penumbra regions of the OAR profiles. The overall mean standard deviation is 0.04% when all data are taken into account. Compared to the benchmark data, the agreements are generally better than 2%. Relative comparison in heterogeneous phantom is in general better than 4%. Conclusion: A commercial deterministic algorithm was commissioned for megavoltage photon beams. In a homogeneous medium, the agreement between the algorithm and measurement at the benchmark points is generally better than 2%. The dose accuracy for a deterministic algorithm is better than a convolution algorithm in heterogeneous medium

  19. The Kennedy Report: Commission Evaluates High School Journalism

    Science.gov (United States)

    Heintz, Ann

    1974-01-01

    Presents excerpts from the report of the Kennedy Commission of Inquiry into High School Journalism, concentrating on censorship, minority participation, journalism education, established media, and censorship issues.

  20. The ATLAS Inner Detector commissioning and calibration

    CERN Document Server

    Aad, G.; Abdallah, J.; Abdelalim, A.A.; Abdesselam, A.; Abdinov, O.; Abi, B.; Abolins, M.; Abramowicz, H.; Abreu, H.; Acharya, B.S.; Adams, D.L.; Addy, T.N.; Adelman, J.; Adorisio, C.; Adragna, P.; Adye, T.; Aefsky, S.; Aguilar-Saavedra, J.A.; Aharrouche, M.; Ahlen, S.P.; Ahles, F.; Ahmad, A.; Ahsan, M.; Aielli, G.; Akdogan, T.; Akesson, T.P.A.; Akimoto, G.; Akimov, A.V.; Aktas, A.; Alam, M.S.; Alam, M.A.; Albert, J.; Albrand, S.; Aleksa, M.; Aleksandrov, I.N.; Alexa, C.; Alexander, G.; Alexandre, G.; Alexopoulos, T.; Alhroob, M.; Aliev, M.; Alimonti, G.; Alison, J.; Aliyev, M.; Allport, P.P.; Allwood-Spiers, S.E.; Almond, J.; Aloisio, A.; Alon, R.; Alonso, A.; Alviggi, M.G.; Amako, K.; Amelung, C.; Amorim, A.; Amoros, G.; Amram, N.; Anastopoulos, C.; Andeen, T.; Anders, C.F.; Anderson, K.J.; Andreazza, A.; Andrei, V.; Anduaga, X.S.; Angerami, A.; Anghinolfi, F.; Anjos, N.; Annovi, A.; Antonaki, A.; Antonelli, M.; Antonelli, S.; Antos, J.; Antunovic, B.; Anulli, F.; Aoun, S.; Arabidze, G.; Aracena, I.; Arai, Y.; Arce, A.T.H.; Archambault, J.P.; Arfaoui, S.; Arguin, J-F.; Argyropoulos, T.; Arik, M.; Armbruster, A.J.; Arnaez, O.; Arnault, C.; Artamonov, A.; Arutinov, D.; Asai, M.; Asai, S.; Asfandiyarov, R.; Ask, S.; Asman, B.; Asner, D.; Asquith, L.; Assamagan, K.; Astbury, A.; Astvatsatourov, A.; Atoian, G.; Auerbach, B.; Augsten, K.; Aurousseau, M.; Austin, N.; Avolio, G.; Avramidou, R.; Axen, D.; Ay, C.; Azuelos, G.; Azuma, Y.; Baak, M.A.; Bach, A.M.; Bachacou, H.; Bachas, K.; Backes, M.; Badescu, E.; Bagnaia, P.; Bai, Y.; Bain, T.; Baines, J.T.; Baker, O.K.; Baker, M.D.; Baker, S.; Baltasar Dos, F.Santos Pedrosa; Banas, E.; Banerjee, P.; Banerjee, S.; Banfi, D.; Bangert, A.; Bansal, V.; Baranov, S.P.; Baranov, S.; Barashkou, A.; Barber, T.; Barberio, E.L.; Barberis, D.; Barbero, M.; Bardin, D.Y.; Barillari, T.; Barisonzi, M.; Barklow, T.; Barlow, N.; Barnett, B.M.; Barnett, R.M.; Baroncelli, A.; Barr, A.J.; Barreiro, F.; Guimara, J.Barreiro; Barrillon, P.; Bartoldus, R.; Bartsch, D.; Bates, R.L.; Batkova, L.; Batley, J.R.; Battaglia, A.; Battistin, M.; Bauer, F.; Bawa, H.S.; Bazalova, M.; Beare, B.; Beau, T.; Beauchemin, P.H.; Beccherle, R.; Bechtle, P.; Beck, G.A.; Beck, H.P.; Beckingham, M.; Becks, K.H.; Beddall, A.J.; Beddall, A.; Bednyakov, V.A.; Bee, C.; Begel, M.; Behar Harpaz, S.; Behera, P.K.; Beimforde, M.; Belanger-Champagne, C.; Bell, P.J.; Bell, W.H.; Bella, G.; Bellagamba, L.; Bellina, F.; Bellomo, M.; Belloni, A.; Belotskiy, K.; Beltramello, O.; Ben Ami, S.; Benary, O.; Benchekroun, D.; Bendel, M.; Benedict, B.H.; Benekos, N.; Benhammou, Y.; Benincasa, G.P.; Benjamin, D.P.; Benoit, M.; Bensinger, J.R.; Benslama, K.; Bentvelsen, S.; Beretta, M.; Berge, D.; Bergeaas Kuutmann, E.; Berger, N.; Berghaus, F.; Berglund, E.; Beringer, J.; Bernat, P.; Bernhard, R.; Bernius, C.; Berry, T.; Bertin, A.; Besana, M.I.; Besson, N.; Bethke, S.; Bianchi, R.M.; Bianco, M.; Biebel, O.; Biesiada, J.; Biglietti, M.; Bilokon, H.; Bindi, M.; Binet, S.; Bingul, A.; Bini, C.; Biscarat, C.; Bitenc, U.; Black, K.M.; Blair, R.E.; Blanchard, J-B.; Blanchot, G.; Blocker, C.; Blondel, A.; Blum, W.; Blumenschein, U.; Bobbink, G.J.; Bocci, A.; Boehler, M.; Boek, J.; Boelaert, N.; Boser, S.; Bogaerts, J.A.; Bohm, C.; Bohm, J.; Boisvert, V.; Bold, T.; Boldea, V.; Bondarenko, V.G.; Bondioli, M.; Boonekamp, M.; Bordoni, S.; Borer, C.; Borisov, A.; Borissov, G.; Borjanovic, I.; Borroni, S.; Bos, K.; Boscherini, D.; Bosman, M.; Boterenbrood, H.; Bouchami, J.; Boudreau, J.; Bouhova-Thacker, E.V.; Boulahouache, C.; Bourdarios, C.; Boveia, A.; Boyd, J.; Boyko, I.R.; Bozovic-Jelisavcic, I.; Bracinik, J.; Braem, A.; Branchini, P.; Brandenburg, G.W.; Brandt, A.; Brandt, G.; Brandt, O.; Bratzler, U.; Brau, B.; Brau, J.E.; Braun, H.M.; Brelier, B.; Bremer, J.; Brenner, R.; Bressler, S.; Britton, D.; Brochu, F.M.; Brock, I.; Brock, R.; Brodet, E.; Bromberg, C.; Brooijmans, G.; Brooks, W.K.; Brown, G.; Bruckman de Renstrom, P.A.; Bruncko, D.; Bruneliere, R.; Brunet, S.; Bruni, A.; Bruni, G.; Bruschi, M.; Bucci, F.; Buchanan, J.; Buchholz, P.; Buckley, A.G.; Budagov, I.A.; Budick, B.; Buscher, V.; Bugge, L.; Bulekov, O.; Bunse, M.; Buran, T.; Burckhart, H.; Burdin, S.; Burgess, T.; Burke, S.; Busato, E.; Bussey, P.; Buszello, C.P.; Butin, F.; Butler, B.; Butler, J.M.; Buttar, C.M.; Butterworth, J.M.; Byatt, T.; Caballero, J.; Urban, S.Cabrera; Caforio, D.; Cakir, O.; Calafiura, P.; Calderini, G.; Calfayan, P.; Calkins, R.; Caloba, L.P.; Calvet, D.; Camarri, P.; Cameron, D.; Campana, S.; Campanelli, M.; Canale, V.; Canelli, F.; Canepa, A.; Cantero, J.; Capasso, L.; Capeans Garrido, M.D.M.; Caprini, I.; Caprini, M.; Capua, M.; Caputo, R.; Caramarcu, C.; Cardarelli, R.; Carli, T.; Carlino, G.; Carminati, L.; Caron, B.; Caron, S.; Carrillo Montoya, G.D.; Carron Montero, S.; Carter, A.A.; Carter, J.R.; Carvalho, J.; Casadei, D.; Casado, M.P.; Cascella, M.; Castaneda Hernadez, A.M.; Castaneda-Miranda, E.; Castillo Gimenez, V.; Castro, N.F.; Cataldi, G.; Catinaccio, A.; Catmore, J.R.; Cattai, A.; Cattani, G.; Caughron, S.; Cauz, D.; Cavalleri, P.; Cavalli, D.; Cavalli-Sforza, M.; Cavasinni, V.; Ceradini, F.; Cerqueira, A.S.; Cerri, A.; Cerrito, L.; Cerutti, F.; Cetin, S.A.; Chafaq, A.; Chakraborty, D.; Chan, K.; Chapman, J.D.; Chapman, J.W.; Chareyre, E.; Charlton, D.G.; Chavda, V.; Cheatham, S.; Chekanov, S.; Chekulaev, S.V.; Chelkov, G.A.; Chen, H.; Chen, S.; Chen, X.; Cheplakov, A.; Chepurnov, V.F.; Cherkaoui El, R.Moursli; Tcherniatine, V.; Chesneanu, D.; Cheu, E.; Cheung, S.L.; Chevalier, L.; Chevallier, F.; Chiarella, V.; Chiefari, G.; Chikovani, L.; Childers, J.T.; Chilingarov, A.; Chiodini, G.; Chizhov, V.; Choudalakis, G.; Chouridou, S.; Christidi, I.A.; Christov, A.; Chromek-Burckhart, D.; Chu, M.L.; Chudoba, J.; Ciapetti, G.; Ciftci, A.K.; Ciftci, R.; Cinca, D.; Cindro, V.; Ciobotaru, M.D.; Ciocca, C.; Ciocio, A.; Cirilli, M.; Citterio, M.; Clark, A.; Clark, P.J.; Cleland, W.; Clemens, J.C.; Clement, B.; Clement, C.; Coadou, Y.; Cobal, M.; Coccaro, A.; Cochran, J.; Coggeshall, J.; Cogneras, E.; Colijn, A.P.; Collard, C.; Collins, N.J.; Collins-Tooth, C.; Collot, J.; Colon, G.; Muino, P.Conde; Coniavitis, E.; Conidi, M.C.; Consonni, M.; Constantinescu, S.; Conta, C.; Conventi, F.; Cooke, M.; Cooper, B.D.; Cooper-Sarkar, A.M.; Cooper-Smith, N.J.; Copic, K.; Cornelissen, T.; Corradi, M.; Corriveau, F.; Corso-Radu, A.; Cortes-Gonzalez, A.; Cortiana, G.; Costa, G.; Costa, M.J.; Costanzo, D.; Costin, T.; Cote, D.; Coura Torres, R.; Courneyea, L.; Cowan, G.; Cowden, C.; Cox, B.E.; Cranmer, K.; Cranshaw, J.; Cristinziani, M.; Crosetti, G.; Crupi, R.; Crepe-Renaudin, S.; Cuenca Almenar, C.; Cuhadar Donszelmann, T.; Curatolo, M.; Curtis, C.J.; Cwetanski, P.; Czyczula, Z.; D'Auria, S.; D'Onofrio, M.; D'Orazio, A.; Da Via, C.; Dabrowski, W.; Dai, T.; Dallapiccola, C.; Dam, M.; Danielsson, H.O.; Dannheim, D.; Dao, V.; Darbo, G.; Darlea, G.L.; Davey, W.; Davidek, T.; Davidson, N.; Davidson, R.; Davies, M.; Davison, A.R.; Dawson, I.; Daya, R.K.; De, K.; de Asmundis, R.; De Castro, S.; De Castro, P.E.Faria Salgado; De Cecco, S.; de Graat, J.; De Groot, N.; de Jong, P.; De Mora, L.; De Oliveira, M.Branco; De Pedis, D.; De Salvo, A.; De Sanctis, U.; De Santo, A.; De Vivie De Regie, J.B.; De Zorzi, G.; Dean, S.; Dedovich, D.V.; Degenhardt, J.; Dehchar, M.; Del Papa, C.; Del Peso, J.; Del Prete, T.; Dell'Acqua, A.; Dell'Asta, L.; Della Pietra, M.; della Volpe, D.; Delmastro, M.; Delsart, P.A.; Deluca, C.; Demers, S.; Demichev, M.; Demirkoz, B.; Deng, J.; Deng, W.; Denisov, S.P.; Derkaoui, J.E.; Derue, F.; Dervan, P.; Desch, K.; Deviveiros, P.O.; Dewhurst, A.; DeWilde, B.; Dhaliwal, S.; Dhullipudi, R.; Di Ciaccio, A.; Di Ciaccio, L.; Di Domenico, A.; Di Girolamo, A.; Di Girolamo, B.; Di Luise, S.; Di Mattia, A.; Di Nardo, R.; Di Simone, A.; Di Sipio, R.; Diaz, M.A.; Diblen, F.; Diehl, E.B.; Dietrich, J.; Dietzsch, T.A.; Diglio, S.; Dindar Yagci, K.; Dingfelder, D.J.; Dionisi, C.; Dita, P.; Dita, S.; Dittus, F.; Djama, F.; Djilkibaev, R.; Djobava, T.; Vale, M.A.B.do; Do Valle, A.Wemans; Doan, T.K.O.; Dobos, D.; Dobson, E.; Dobson, M.; Doglioni, C.; Doherty, T.; Dolejsi, J.; Dolenc, I.; Dolezal, Z.; Dolgoshein, B.A.; Dohmae, T.; Donega, M.; Donini, J.; Dopke, J.; Doria, A.; Dos Anjos, A.; Dotti, A.; Dova, M.T.; Doxiadis, A.; Doyle, A.T.; Drasal, Z.; Dris, M.; Dubbert, J.; Duchovni, E.; Duckeck, G.; Dudarev, A.; Dudziak, F.; Duhrssen, M.; Duflot, L.; Dufour, M-A.; Dunford, M.; Duran Yildiz, H.; Dushkin, A.; Duxfield, R.; Dwuznik, M.; Duren, M.; Ebenstein, W.L.; Ebke, J.; Eckweiler, S.; Edmonds, K.; Edwards, C.A.; Egorov, K.; Ehrenfeld, W.; Ehrich, T.; Eifert, T.; Eigen, G.; Einsweiler, K.; Eisenhandler, E.; Ekelof, T.; El Kacimi, M.; Ellert, M.; Elles, S.; Ellinghaus, F.; Ellis, K.; Ellis, N.; Elmsheuser, J.; Elsing, M.; Emeliyanov, D.; Engelmann, R.; Engl, A.; Epp, B.; Eppig, A.; Erdmann, J.; Ereditato, A.; Eriksson, D.; Ermoline, I.; Ernst, J.; Ernst, M.; Ernwein, J.; Errede, D.; Errede, S.; Ertel, E.; Escalier, M.; Escobar, C.; Espinal Curull, X.; Esposito, B.; Etienvre, A.I.; Etzion, E.; Evans, H.; Fabbri, L.; Fabre, C.; Facius, K.; Fakhrutdinov, R.M.; Falciano, S.; Fang, Y.; Fanti, M.; Farbin, A.; Farilla, A.; Farley, J.; Farooque, T.; Farrington, S.M.; Farthouat, P.; Fassnacht, P.; Fassouliotis, D.; Fatholahzadeh, B.; Fayard, L.; Fayette, F.; Febbraro, R.; Federic, P.; Fedin, O.L.; Fedorko, W.; Feligioni, L.; Felzmann, C.U.; Feng, C.; Feng, E.J.; Fenyuk, A.B.; Ferencei, J.; Ferland, J.; Fernandes, B.; Fernando, W.; Ferrag, S.; Ferrando, J.; Ferrara, V.; Ferrari, A.; Ferrari, P.; Ferrari, R.; Ferrer, A.; Ferrer, M.L.; Ferrere, D.; Ferretti, C.; Fiascaris, M.; Fiedler, F.; Filipcic, A.; Filippas, A.; Filthaut, F.; Fincke-Keeler, M.; Fiolhais, M.C.N.; Fiorini, L.; Firan, A.; Fischer, G.; Fisher, M.J.; Flechl, M.; Fleck, I.; Fleckner, J.; Fleischmann, P.; Fleischmann, S.; Flick, T.; Flores Castillo, L.R.; Flowerdew, M.J.; Fonseca Martin, T.; Formica, A.; Forti, A.; Fortin, D.; Fournier, D.; Fowler, A.J.; Fowler, K.; Fox, H.; Francavilla, P.; Franchino, S.; Francis, D.; Franklin, M.; Franz, S.; Fraternali, M.; Fratina, S.; Freestone, J.; French, S.T.; Froeschl, R.; Froidevaux, D.; Frost, J.A.; Fukunaga, C.; Fullana Torregrosa, E.; Fuster, J.; Gabaldon, C.; Gabizon, O.; Gadfort, T.; Gadomski, S.; Gagliardi, G.; Gagnon, P.; Galea, C.; Gallas, E.J.; Gallo, V.; Gallop, B.J.; Gallus, P.; Galyaev, E.; Gan, K.K.; Gao, Y.S.; Gaponenko, A.; Garcia-Sciveres, M.; Garcia, C.; Navarro, J.E.Garcia; Gardner, R.W.; Garelli, N.; Garitaonandia, H.; Garonne, V.; Gatti, C.; Gaudio, G.; Gauzzi, P.; Gavrilenko, I.L.; Gay, C.; Gaycken, G.; Gazis, E.N.; Ge, P.; Gee, C.N.P.; Geich-Gimbel, Ch.; Gellerstedt, K.; Gemme, C.; Genest, M.H.; Gentile, S.; Georgatos, F.; George, S.; Gershon, A.; Ghazlane, H.; Ghodbane, N.; Giacobbe, B.; Giagu, S.; Giakoumopoulou, V.; Giangiobbe, V.; Gianotti, F.; Gibbard, B.; Gibson, A.; Gibson, S.M.; Gilbert, L.M.; Gilchriese, M.; Gilewsky, V.; Gingrich, D.M.; Ginzburg, J.; Giokaris, N.; Giordani, M.P.; Giordano, R.; Giorgi, F.M.; Giovannini, P.; Giraud, P.F.; Girtler, P.; Giugni, D.; Giusti, P.; Gjelsten, B.K.; Gladilin, L.K.; Glasman, C.; Glazov, A.; Glitza, K.W.; Glonti, G.L.; Godfrey, J.; Godlewski, J.; Goebel, M.; Gopfert, T.; Goeringer, C.; Gossling, C.; Gottfert, T.; Goggi, V.; Goldfarb, S.; Goldin, D.; Golling, T.; Gomes, A.; Gomez Fajardo, L.S.; Goncalo, R.; Gonella, L.; Gong, C.; Gonzalez de la Hoz, S.; Gonzalez Silva, M.L.; Gonzalez-Sevilla, S.; Goodson, J.J.; Goossens, L.; Gordon, H.A.; Gorelov, I.; Gorfine, G.; Gorini, B.; Gorini, E.; Gorisek, A.; Gornicki, E.; Gosdzik, B.; Gosselink, M.; Gostkin, M.I.; Gough Eschrich, I.; Gouighri, M.; Goujdami, D.; Goulette, M.P.; Goussiou, A.G.; Goy, C.; Grabowska-Bold, I.; Grafstrom, P.; Grahn, K-J.; Grancagnolo, S.; Grassi, V.; Gratchev, V.; Grau, N.; Gray, H.M.; Gray, J.A.; Graziani, E.; Green, B.; Greenshaw, T.; Greenwood, Z.D.; Gregor, I.M.; Grenier, P.; Griesmayer, E.; Griffiths, J.; Grigalashvili, N.; Grillo, A.A.; Grimm, K.; Grinstein, S.; Grishkevich, Y.V.; Groh, M.; Groll, M.; Gross, E.; Grosse-Knetter, J.; Groth-Jensen, J.; Grybel, K.; Guicheney, C.; Guida, A.; Guillemin, T.; Guler, H.; Gunther, J.; Guo, B.; Gusakov, Y.; Gutierrez, A.; Gutierrez, P.; Guttman, N.; Gutzwiller, O.; Guyot, C.; Gwenlan, C.; Gwilliam, C.B.; Haas, A.; Haas, S.; Haber, C.; Hadavand, H.K.; Hadley, D.R.; Haefner, P.; Hartel, R.; Hajduk, Z.; Hakobyan, H.; Haller, J.; Hamacher, K.; Hamilton, A.; Hamilton, S.; Han, L.; Hanagaki, K.; Hance, M.; Handel, C.; Hanke, P.; Hansen, J.R.; Hansen, J.B.; Hansen, J.D.; Hansen, P.H.; Hansl-Kozanecka, T.; Hansson, P.; Hara, K.; Hare, G.A.; Harenberg, T.; Harrington, R.D.; Harris, O.M.; Harrison, K.; Hartert, J.; Hartjes, F.; Harvey, A.; Hasegawa, S.; Hasegawa, Y.; Hashemi, K.; Hassani, S.; Haug, S.; Hauschild, M.; Hauser, R.; Havranek, M.; Hawkes, C.M.; Hawkings, R.J.; Hayakawa, T.; Hayward, H.S.; Haywood, S.J.; Head, S.J.; Hedberg, V.; Heelan, L.; Heim, S.; Heinemann, B.; Heisterkamp, S.; Helary, L.; Heller, M.; Hellman, S.; Helsens, C.; Hemperek, T.; Henderson, R.C.W.; Henke, M.; Henrichs, A.; Henriques Correia, A.M.; Henrot-Versille, S.; Hensel, C.; Henss, T.; Hernandez Jimenez, Y.; Hershenhorn, A.D.; Herten, G.; Hertenberger, R.; Hervas, L.; Hessey, N.P.; Higon-Rodriguez, E.; Hill, J.C.; Hiller, K.H.; Hillert, S.; Hillier, S.J.; Hinchliffe, I.; Hines, E.; Hirose, M.; Hirsch, F.; Hirschbuehl, D.; Hobbs, J.; Hod, N.; Hodgkinson, M.C.; Hodgson, P.; Hoecker, A.; Hoeferkamp, M.R.; Hoffman, J.; Hoffmann, D.; Hohlfeld, M.; Holy, T.; Holzbauer, J.L.; Homma, Y.; Horazdovsky, T.; Hori, T.; Horn, C.; Horner, S.; Horvat, S.; Hostachy, J-Y.; Hou, S.; Hoummada, A.; Howe, T.; Hrivnac, J.; Hryn'ova, T.; Hsu, P.J.; Hsu, S.C.; Huang, G.S.; Hubacek, Z.; Hubaut, F.; Huegging, F.; Huffman, T.B.; Hughes, E.W.; Hughes, G.; Hurwitz, M.; Husemann, U.; Huseynov, N.; Huston, J.; Huth, J.; Iacobucci, G.; Iakovidis, G.; Ibragimov, I.; Iconomidou-Fayard, L.; Idarraga, J.; Iengo, P.; Igonkina, O.; Ikegami, Y.; Ikeno, M.; Ilchenko, Y.; Iliadis, D.; Ince, T.; Ioannou, P.; Iodice, M.; Irles Quiles, A.; Ishikawa, A.; Ishino, M.; Ishmukhametov, R.; Isobe, T.; Issever, C.; Istin, S.; Itoh, Y.; Ivashin, A.V.; Iwasaki, H.; Izen, J.M.; Izzo, V.; Jackson, B.; Jackson, J.N.; Jackson, P.; Jaekel, M.R.; Jain, V.; Jakobs, K.; Jakobsen, S.; Jakubek, J.; Jana, D.; Jankowski, E.; Jansen, E.; Jantsch, A.; Janus, M.; Jared, R.C.; Jarlskog, G.; Jeanty, L.; Plante, I.Jen-La; Jenni, P.; Jez, P.; Jezequel, S.; Ji, W.; Jia, J.; Jiang, Y.; Jimenez Belenguer, M.; Jin, S.; Jinnouchi, O.; Joffe, D.; Johansen, M.; Johansson, K.E.; Johansson, P.; Johnert, S.; Johns, K.A.; Jon-And, K.; Jones, G.; Jones, R.W.L.; Jones, T.J.; Jorge, P.M.; Joseph, J.; Juranek, V.; Jussel, P.; Kabachenko, V.V.; Kaci, M.; Kaczmarska, A.; Kado, M.; Kagan, H.; Kagan, M.; Kaiser, S.; Kajomovitz, E.; Kalinin, S.; Kalinovskaya, L.V.; Kama, S.; Kanaya, N.; Kaneda, M.; Kantserov, V.A.; Kanzaki, J.; Kaplan, B.; Kapliy, A.; Kaplon, J.; Kar, D.; Karagounis, M.; Karagoz Unel, M.; Karnevskiy, M.; Kartvelishvili, V.; Karyukhin, A.N.; Kashif, L.; Kasmi, A.; Kass, R.D.; Kastanas, A.; Kastoryano, M.; Kataoka, M.; Kataoka, Y.; Katsoufis, E.; Katzy, J.; Kaushik, V.; Kawagoe, K.; Kawamoto, T.; Kawamura, G.; Kayl, M.S.; Kayumov, F.; Kazanin, V.A.; Kazarinov, M.Y.; Keates, J.R.; Keeler, R.; Keener, P.T.; Kehoe, R.; Keil, M.; Kekelidze, G.D.; Kelly, M.; Kenyon, M.; Kepka, O.; Kerschen, N.; Kersevan, B.P.; Kersten, S.; Kessoku, K.; Khakzad, M.; Khalil-zada, F.; Khandanyan, H.; Khanov, A.; Kharchenko, D.; Khodinov, A.; Khomich, A.; Khoriauli, G.; Khovanskiy, N.; Khovanskiy, V.; Khramov, E.; Khubua, J.; Kim, H.; Kim, M.S.; Kim, P.C.; Kim, S.H.; Kind, O.; Kind, P.; King, B.T.; Kirk, J.; Kirsch, G.P.; Kirsch, L.E.; Kiryunin, A.E.; Kisielewska, D.; Kittelmann, T.; Kiyamura, H.; Kladiva, E.; Klein, M.; Klein, U.; Kleinknecht, K.; Klemetti, M.; Klier, A.; Klimentov, A.; Klingenberg, R.; Klinkby, E.B.; Klioutchnikova, T.; Klok, P.F.; Klous, S.; Kluge, E.E.; Kluge, T.; Kluit, P.; Klute, M.; Kluth, S.; Knecht, N.S.; Kneringer, E.; Ko, B.R.; Kobayashi, T.; Kobel, M.; Koblitz, B.; Kocian, M.; Kocnar, A.; Kodys, P.; Koneke, K.; Konig, A.C.; Koenig, S.; Kopke, L.; Koetsveld, F.; Koevesarki, P.; Koffas, T.; Koffeman, E.; Kohn, F.; Kohout, Z.; Kohriki, T.; Kolanoski, H.; Kolesnikov, V.; Koletsou, I.; Koll, J.; Kollar, D.; Kolos, S.; Kolya, S.D.; Komar, A.A.; Komaragiri, J.R.; Kondo, T.; Kono, T.; Konoplich, R.; Konovalov, S.P.; Konstantinidis, N.; Koperny, S.; Korcyl, K.; Kordas, K.; Korn, A.; Korolkov, I.; Korolkova, E.V.; Korotkov, V.A.; Kortner, O.; Kostka, P.; Kostyukhin, V.V.; Kotov, S.; Kotov, V.M.; Kotov, K.Y.; Kourkoumelis, C.; Koutsman, A.; Kowalewski, R.; Kowalski, H.; Kowalski, T.Z.; Kozanecki, W.; Kozhin, A.S.; Kral, V.; Kramarenko, V.A.; Kramberger, G.; Krasny, M.W.; Krasznahorkay, A.; Kraus, J.; Kreisel, A.; Krejci, F.; Kretzschmar, J.; Krieger, N.; Krieger, P.; Kroeninger, K.; Kroha, H.; Kroll, J.; Kroseberg, J.; Krstic, J.; Kruchonak, U.; Kruger, H.; Krumshteyn, Z.V.; Kubota, T.; Kuehn, S.; Kugel, A.; Kuhl, T.; Kuhn, D.; Kukhtin, V.; Kulchitsky, Y.; Kuleshov, S.; Kummer, C.; Kuna, M.; Kunkle, J.; Kupco, A.; Kurashige, H.; Kurata, M.; Kurchaninov, L.L.; Kurochkin, Y.A.; Kus, V.; Kwee, R.; La Rosa, A.; La Rotonda, L.; Labbe, J.; Lacasta, C.; Lacava, F.; Lacker, H.; Lacour, D.; Lacuesta, V.R.; Ladygin, E.; Lafaye, R.; Laforge, B.; Lagouri, T.; Lai, S.; Lamanna, M.; Lampen, C.L.; Lampl, W.; Lancon, E.; Landgraf, U.; Landon, M.P.J.; Lane, J.L.; Lankford, A.J.; Lanni, F.; Lantzsch, K.; Lanza, A.; Laplace, S.; Lapoire, C.; Laporte, J.F.; Lari, T.; Larner, A.; Lassnig, M.; Laurelli, P.; Lavrijsen, W.; Laycock, P.; Lazarev, A.B.; Lazzaro, A.; Le Dortz, O.; Le Guirriec, E.; Le Menedeu, E.; Le Vine, M.; Lebedev, A.; Lebel, C.; LeCompte, T.; Ledroit-Guillon, F.; Lee, H.; Lee, J.S.H.; Lee, S.C.; Lefebvre, M.; Legendre, M.; LeGeyt, B.C.; Legger, F.; Leggett, C.; Lehmacher, M.; Lehmann Miotto, G.; Lei, X.; Leitner, R.; Lellouch, D.; Lellouch, J.; Lendermann, V.; Leney, K.J.C.; Lenz, T.; Lenzen, G.; Lenzi, B.; Leonhardt, K.; Leroy, C.; Lessard, J-R.; Lester, C.G.; Leung Fook, A.Cheong; Leveque, J.; Levin, D.; Levinson, L.J.; Leyton, M.; Li, H.; Li, X.; Liang, Z.; Liang, Z.; Liberti, B.; Lichard, P.; Lichtnecker, M.; Lie, K.; Liebig, W.; Lilley, J.N.; Limosani, A.; Limper, M.; Lin, S.C.; Linnemann, J.T.; Lipeles, E.; Lipinsky, L.; Lipniacka, A.; Liss, T.M.; Lissauer, D.; Lister, A.; Litke, A.M.; Liu, C.; Liu, D.; Liu, H.; Liu, J.B.; Liu, M.; Liu, T.; Liu, Y.; Livan, M.; Lleres, A.; Lloyd, S.L.; Lobodzinska, E.; Loch, P.; Lockman, W.S.; Lockwitz, S.; Loddenkoetter, T.; Loebinger, F.K.; Loginov, A.; Loh, C.W.; Lohse, T.; Lohwasser, K.; Lokajicek, M.; Long, R.E.; Lopes, L.; Lopez Mateos, D.; Losada, M.; Loscutoff, P.; Lou, X.; Lounis, A.; Loureiro, K.F.; Lovas, L.; Love, J.; Love, P.A.; Lowe, A.J.; Lu, F.; Lubatti, H.J.; Luci, C.; Lucotte, A.; Ludwig, A.; Ludwig, D.; Ludwig, I.; Luehring, F.; Luisa, L.; Lumb, D.; Luminari, L.; Lund, E.; Lund-Jensen, B.; Lundberg, B.; Lundberg, J.; Lundquist, J.; Lynn, D.; Lys, J.; Lytken, E.; Ma, H.; Ma, L.L.; Macana Goia, J.A.; Maccarrone, G.; Macchiolo, A.; Macek, B.; Machado Miguens, J.; Mackeprang, R.; Madaras, R.J.; Mader, W.F.; Maenner, R.; Maeno, T.; Mattig, P.; Mattig, S.; Magalhaes Martins, P.J.; Magradze, E.; Mahalalel, Y.; Mahboubi, K.; Mahmood, A.; Maiani, C.; Maidantchik, C.; Maio, A.; Majewski, S.; Makida, Y.; Makouski, M.; Makovec, N.; Malecki, Pa.; Malecki, P.; Maleev, V.P.; Malek, F.; Mallik, U.; Malon, D.; Maltezos, S.; Malyshev, V.; Malyukov, S.; Mambelli, M.; Mameghani, R.; Mamuzic, J.; Mandelli, L.; Mandic, I.; Mandrysch, R.; Maneira, J.; Mangeard, P.S.; Manjavidze, I.D.; Manning, P.M.; Manousakis-Katsikakis, A.; Mansoulie, B.; Mapelli, A.; Mapelli, L.; March, L.; Marchand, J.F.; Marchese, F.; Marchiori, G.; Marcisovsky, M.; Marino, C.P.; Marroquim, F.; Marshall, Z.; Marti-Garcia, S.; Martin, A.J.; Martin, A.J.; Martin, B.; Martin, B.; Martin, F.F.; Martin, J.P.; Martin, T.A.; Dit Latour, B.Martin; Martinez, M.; Martinez Outschoorn, V.; Martini, A.; Martyniuk, A.C.; Marzano, F.; Marzin, A.; Masetti, L.; Mashimo, T.; Mashinistov, R.; Masik, J.; Maslennikov, A.L.; Massa, I.; Massol, N.; Mastroberardino, A.; Masubuchi, T.; Matsunaga, H.; Matsushita, T.; Mattravers, C.; Maxfield, S.J.; Mayne, A.; Mazini, R.; Mazur, M.; Mazzanti, M.; Mc Donald, J.; Mc Kee, S.P.; McCarn, A.; McCarthy, R.L.; McCubbin, N.A.; McFarlane, K.W.; McGlone, H.; Mchedlidze, G.; McMahon, S.J.; McPherson, R.A.; Meade, A.; Mechnich, J.; Mechtel, M.; Medinnis, M.; Meera-Lebbai, R.; Meguro, T.M.; Mehlhase, S.; Mehta, A.; Meier, K.; Meirose, B.; Melachrinos, C.; Mellado Garcia, B.R.; Mendoza Navas, L.; Meng, Z.; Menke, S.; Meoni, E.; Mermod, P.; Merola, L.; Meroni, C.; Merritt, F.S.; Messina, A.M.; Metcalfe, J.; Mete, A.S.; Meyer, J-P.; Meyer, J.; Meyer, J.; Meyer, T.C.; Meyer, W.T.; Miao, J.; Michal, S.; Micu, L.; Middleton, R.P.; Migas, S.; Mijovic, L.; Mikenberg, G.; Mikestikova, M.; Mikuz, M.; Miller, D.W.; Mills, W.J.; Mills, C.M.; Milov, A.; Milstead, D.A.; Milstein, D.; Minaenko, A.A.; Minano, M.; Minashvili, I.A.; Mincer, A.I.; Mindur, B.; Mineev, M.; Ming, Y.; Mir, L.M.; Mirabelli, G.; Misawa, S.; Miscetti, S.; Misiejuk, A.; Mitrevski, J.; Mitsou, V.A.; Miyagawa, P.S.; Mjornmark, J.U.; Mladenov, D.; Moa, T.; Moed, S.; Moeller, V.; Monig, K.; Moser, N.; Mohr, W.; Mohrdieck-Mock, S.; Moles-Valls, R.; Molina-Perez, J.; Monk, J.; Monnier, E.; Montesano, S.; Monticelli, F.; Moore, R.W.; Mora Herrera, C.; Moraes, A.; Morais, A.; Morel, J.; Morello, G.; Moreno, D.; Llacer, M.Moreno; Morettini, P.; Morii, M.; Morley, A.K.; Mornacchi, G.; Morozov, S.V.; Morris, J.D.; Moser, H.G.; Mosidze, M.; Moss, J.; Mount, R.; Mountricha, E.; Mouraviev, S.V.; Moyse, E.J.W.; Mudrinic, M.; Mueller, F.; Mueller, J.; Mueller, K.; Muller, T.A.; Muenstermann, D.; Muir, A.; Munwes, Y.; Murillo Garcia, R.; Murray, W.J.; Mussche, I.; Musto, E.; Myagkov, A.G.; Myska, M.; Nadal, J.; Nagai, K.; Nagano, K.; Nagasaka, Y.; Nairz, A.M.; Nakamura, K.; Nakano, I.; Nakatsuka, H.; Nanava, G.; Napier, A.; Nash, M.; Nation, N.R.; Nattermann, T.; Naumann, T.; Navarro, G.; Nderitu, S.K.; Neal, H.A.; Nebot, E.; Nechaeva, P.; Negri, A.; Negri, G.; Nelson, A.; Nelson, T.K.; Nemecek, S.; Nemethy, P.; Nepomuceno, A.A.; Nessi, M.; Neubauer, M.S.; Neusiedl, A.; Neves, R.N.; Nevski, P.; Newcomer, F.M.; Nickerson, R.B.; Nicolaidou, R.; Nicolas, L.; Nicoletti, G.; Nicquevert, B.; Niedercorn, F.; Nielsen, J.; Nikiforov, A.; Nikolaev, K.; Nikolic-Audit, I.; Nikolopoulos, K.; Nilsen, H.; Nilsson, P.; Nisati, A.; Nishiyama, T.; Nisius, R.; Nodulman, L.; Nomachi, M.; Nomidis, I.; Nordberg, M.; Nordkvist, B.; Notz, D.; Novakova, J.; Nozaki, M.; Nozicka, M.; Nugent, I.M.; Nuncio-Quiroz, A.E.; Nunes Hanninger, G.; Nunnemann, T.; Nurse, E.; O'Neil, D.C.; O'Shea, V.; Oakham, F.G.; Oberlack, H.; Ochi, A.; Oda, S.; Odaka, S.; Odier, J.; Ogren, H.; Oh, A.; Oh, S.H.; Ohm, C.C.; Ohshima, T.; Ohshita, H.; Ohsugi, T.; Okada, S.; Okawa, H.; Okumura, Y.; Okuyama, T.; Olchevski, A.G.; Oliveira, M.; Oliveira Damazio, D.; Oliver, J.; Oliver Garcia, E.; Olivito, D.; Olszewski, A.; Olszowska, J.; Omachi, C.; Onofre, A.; Onyisi, P.U.E.; Oram, C.J.; Oreglia, M.J.; Oren, Y.; Orestano, D.; Orlov, I.; Oropeza Barrera, C.; Orr, R.S.; Ortega, E.O.; Osculati, B.; Ospanov, R.; Osuna, C.; Ottersbach, J.P.; Ould-Saada, F.; Ouraou, A.; Ouyang, Q.; Owen, M.; Owen, S.; Oyarzun, A.; Ozcan, V.E.; Ozone, K.; Ozturk, N.; Pacheco Pages, A.; Padilla Aranda, C.; Paganis, E.; Pahl, C.; Paige, F.; Pajchel, K.; Palestini, S.; Pallin, D.; Palma, A.; Palmer, J.D.; Pan, Y.B.; Panagiotopoulou, E.; Panes, B.; Panikashvili, N.; Panitkin, S.; Pantea, D.; Panuskova, M.; Paolone, V.; Papadopoulou, Th.D.; Park, S.J.; Park, W.; Parker, M.A.; Parker, S.I.; Parodi, F.; Parsons, J.A.; Parzefall, U.; Pasqualucci, E.; Passeri, A.; Pastore, F.; Pastore, Fr.; Pasztor, G.; Pataraia, S.; Pater, J.R.; Patricelli, S.; Patwa, A.; Pauly, T.; Peak, L.S.; Pecsy, M.; Pedraza Morales, M.I.; Peleganchuk, S.V.; Peng, H.; Penson, A.; Penwell, J.; Perantoni, M.; Perez, K.; Perez Codina, E.; Perez Garcia-Estan, M.T.; Perez Reale, V.; Perini, L.; Pernegger, H.; Perrino, R.; Persembe, S.; Perus, P.; Peshekhonov, V.D.; Petersen, B.A.; Petersen, T.C.; Petit, E.; Petridou, C.; Petrolo, E.; Petrucci, F.; Petschull, D.; Petteni, M.; Pezoa, R.; Phan, A.; Phillips, A.W.; Piacquadio, G.; Piccinini, M.; Piegaia, R.; Pilcher, J.E.; Pilkington, A.D.; Pina, J.; Pinamonti, M.; Pinfold, J.L.; Pinto, B.; Pizio, C.; Placakyte, R.; Plamondon, M.; Pleier, M.A.; Poblaguev, A.; Poddar, S.; Podlyski, F.; Poffenberger, P.; Poggioli, L.; Pohl, M.; Polci, F.; Polesello, G.; Policicchio, A.; Polini, A.; Poll, J.; Polychronakos, V.; Pomeroy, D.; Pommes, K.; Pontecorvo, L.; Pope, B.G.; Popovic, D.S.; Poppleton, A.; Popule, J.; Portell Bueso, X.; Porter, R.; Pospelov, G.E.; Pospisil, S.; Potekhin, M.; Potrap, I.N.; Potter, C.J.; Potter, C.T.; Potter, K.P.; Poulard, G.; Poveda, J.; Prabhu, R.; Pralavorio, P.; Prasad, S.; Pravahan, R.; Pribyl, L.; Price, D.; Price, L.E.; Prichard, P.M.; Prieur, D.; Primavera, M.; Prokofiev, K.; Prokoshin, F.; Protopopescu, S.; Proudfoot, J.; Prudent, X.; Przysiezniak, H.; Psoroulas, S.; Ptacek, E.; Puigdengoles, C.; Purdham, J.; Purohit, M.; Puzo, P.; Pylypchenko, Y.; Qi, M.; Qian, J.; Qian, W.; Qin, Z.; Quadt, A.; Quarrie, D.R.; Quayle, W.B.; Quinonez, F.; Raas, M.; Radeka, V.; Radescu, V.; Radics, B.; Rador, T.; Ragusa, F.; Rahal, G.; Rahimi, A.M.; Rajagopalan, S.; Rammensee, M.; Rammes, M.; Rauscher, F.; Rauter, E.; Raymond, M.; Read, A.L.; Rebuzzi, D.M.; Redelbach, A.; Redlinger, G.; Reece, R.; Reeves, K.; Reinherz-Aronis, E.; Reinsch, A.; Reisinger, I.; Reljic, D.; Rembser, C.; Ren, Z.L.; Renkel, P.; Rescia, S.; Rescigno, M.; Resconi, S.; Resende, B.; Reznicek, P.; Rezvani, R.; Richards, A.; Richards, R.A.; Richter, R.; Richter-Was, E.; Ridel, M.; Rijpstra, M.; Rijssenbeek, M.; Rimoldi, A.; Rinaldi, L.; Rios, R.R.; Riu, I.; Rizatdinova, F.; Rizvi, E.; Roa Romero, D.A.; Robertson, S.H.; Robichaud-Veronneau, A.; Robinson, D.; Robinson, J.E.M.; Robinson, M.; Robson, A.; Rocha de Lima, J.G.; Roda, C.; Roda Dos, D.Santos; Rodriguez, D.; Rodriguez Garcia, Y.; Roe, S.; Rohne, O.; Rojo, V.; Rolli, S.; Romaniouk, A.; Romanov, V.M.; Romeo, G.; Romero Maltrana, D.; Roos, L.; Ros, E.; Rosati, S.; Rosenbaum, G.A.; Rosselet, L.; Rossetti, V.; Rossi, L.P.; Rotaru, M.; Rothberg, J.; Rousseau, D.; Royon, C.R.; Rozanov, A.; Rozen, Y.; Ruan, X.; Ruckert, B.; Ruckstuhl, N.; Rud, V.I.; Rudolph, G.; Ruhr, F.; Ruggieri, F.; Ruiz-Martinez, A.; Rumyantsev, L.; Rurikova, Z.; Rusakovich, N.A.; Rutherfoord, J.P.; Ruwiedel, C.; Ruzicka, P.; Ryabov, Y.F.; Ryan, P.; Rybkin, G.; Rzaeva, S.; Saavedra, A.F.; Sadrozinski, H.F-W.; Sadykov, R.; Safai Tehrani, F.; Sakamoto, H.; Salamanna, G.; Salamon, A.; Saleem, M.S.; Salihagic, D.; Salnikov, A.; Salt, J.; Salvachua Ferrando, B.M.; Salvatore, D.; Salvatore, F.; Salvucci, A.; Salzburger, A.; Sampsonidis, D.; Samset, B.H.; Sanchis Lozano, M.A.; Sandaker, H.; Sander, H.G.; Sanders, M.P.; Sandhoff, M.; Sandhu, P.; Sandstroem, R.; Sandvoss, S.; Sankey, D.P.C.; Sanny, B.; Sansoni, A.; Santamarina Rios, C.; Santoni, C.; Santonico, R.; Saraiva, J.G.; Sarangi, T.; Sarkisyan-Grinbaum, E.; Sarri, F.; Sasaki, O.; Sasao, N.; Satsounkevitch, I.; Sauvage, G.; Savard, P.; Savine, A.Y.; Savinov, V.; Sawyer, L.; Saxon, D.H.; Says, L.P.; Sbarra, C.; Sbrizzi, A.; Scannicchio, D.A.; Schaarschmidt, J.; Schacht, P.; Schafer, U.; Schaetzel, S.; Schaffer, A.C.; Schaile, D.; Schamberger, R.D.; Schamov, A.G.; Scharf, V.; Schegelsky, V.A.; Scheirich, D.; Schernau, M.; Scherzer, M.I.; Schiavi, C.; Schieck, J.; Schioppa, M.; Schlenker, S.; Schmidt, E.S.; Schmieden, K.; Schmitt, C.; Schmitz, M.; Schonig, A.; Schott, M.; Schouten, D.; Schovancova, J.; Schram, M.; Schreiner, A.; Schroeder, C.; Schroer, N.; Schroers, M.; Schultes, J.; Schultz-Coulon, H.C.; Schumacher, J.W.; Schumacher, M.; Schumm, B.A.; Schune, Ph.; Schwanenberger, C.; Schwartzman, A.; Schwemling, Ph.; Schwienhorst, R.; Schwierz, R.; Schwindling, J.; Scott, W.G.; Searcy, J.; Sedykh, E.; Segura, E.; Seidel, S.C.; Seiden, A.; Seifert, F.; Seixas, J.M.; Sekhniaidze, G.; Seliverstov, D.M.; Sellden, B.; Semprini-Cesari, N.; Serfon, C.; Serin, L.; Seuster, R.; Severini, H.; Sevior, M.E.; Sfyrla, A.; Shabalina, E.; Shamim, M.; Shan, L.Y.; Shank, J.T.; Shao, Q.T.; Shapiro, M.; Shatalov, P.B.; Shaw, K.; Sherman, D.; Sherwood, P.; Shibata, A.; Shimojima, M.; Shin, T.; Shmeleva, A.; Shochet, M.J.; Shupe, M.A.; Sicho, P.; Sidoti, A.; Siegert, F.; Siegrist, J.; Sijacki, Dj.; Silbert, O.; Silva, J.; Silver, Y.; Silverstein, D.; Silverstein, S.B.; Simak, V.; Simic, Lj.; Simion, S.; Simmons, B.; Simonyan, M.; Sinervo, P.; Sinev, N.B.; Sipica, V.; Siragusa, G.; Sisakyan, A.N.; Sivoklokov, S.Yu.; Sjoelin, J.; Sjursen, T.B.; Skovpen, K.; Skubic, P.; Slater, M.; Slavicek, T.; Sliwa, K.; Sloper, J.; Sluka, T.; Smakhtin, V.; Smirnov, S.Yu.; Smirnov, Y.; Smirnova, L.N.; Smirnova, O.; Smith, B.C.; Smith, D.; Smith, K.M.; Smizanska, M.; Smolek, K.; Snesarev, A.A.; Snow, S.W.; Snow, J.; Snuverink, J.; Snyder, S.; Soares, M.; Sobie, R.; Sodomka, J.; Soffer, A.; Solans, C.A.; Solar, M.; Solc, J.; Solfaroli Camillocci, E.; Solodkov, A.A.; Solovyanov, O.V.; Soluk, R.; Sondericker, J.; Sopko, V.; Sopko, B.; Sosebee, M.; Soukharev, A.; Spagnolo, S.; Spano, F.; Spencer, E.; Spighi, R.; Spigo, G.; Spila, F.; Spiwoks, R.; Spousta, M.; Spreitzer, T.; Spurlock, B.; Denis, R.D.St.; Stahl, T.; Stahlman, J.; Stamen, R.; Stancu, S.N.; Stanecka, E.; Stanek, R.W.; Stanescu, C.; Stapnes, S.; Starchenko, E.A.; Stark, J.; Staroba, P.; Starovoitov, P.; Stastny, J.; Stavina, P.; Steele, G.; Steinbach, P.; Steinberg, P.; Stekl, I.; Stelzer, B.; Stelzer, H.J.; Stelzer-Chilton, O.; Stenzel, H.; Stevenson, K.; Stewart, G.; Stockton, M.C.; Stoerig, K.; Stoicea, G.; Stonjek, S.; Strachota, P.; Stradling, A.R.; Straessner, A.; Strandberg, J.; Strandberg, S.; Strandlie, A.; Strauss, M.; Strizenec, P.; Strohmer, R.; Strom, D.M.; Stroynowski, R.; Strube, J.; Stugu, B.; Sturm, P.; Soh, D.A.; Su, D.; Sugaya, Y.; Sugimoto, T.; Suhr, C.; Suk, M.; Sulin, V.V.; Sultansoy, S.; Sumida, T.; Sun, X.H.; Sundermann, J.E.; Suruliz, K.; Sushkov, S.; Susinno, G.; Sutton, M.R.; Suzuki, T.; Suzuki, Y.; Sykora, I.; Sykora, T.; Szymocha, T.; Sanchez, J.; Ta, D.; Tackmann, K.; Taffard, A.; Tafirout, R.; Taga, A.; Takahashi, Y.; Takai, H.; Takashima, R.; Takeda, H.; Takeshita, T.; Talby, M.; Talyshev, A.; Tamsett, M.C.; Tanaka, J.; Tanaka, R.; Tanaka, S.; Tanaka, S.; Tapprogge, S.; Tardif, D.; Tarem, S.; Tarrade, F.; Tartarelli, G.F.; Tas, P.; Tasevsky, M.; Tassi, E.; Tatarkhanov, M.; Taylor, C.; Taylor, F.E.; Taylor, G.N.; Taylor, R.P.; Taylor, W.; Teixeira-Dias, P.; Ten Kate, H.; Teng, P.K.; Tennenbaum-Katan, Y.D.; Terada, S.; Terashi, K.; Terron, J.; Terwort, M.; Testa, M.; Teuscher, R.J.; Therhaag, J.; Thioye, M.; Thoma, S.; Thomas, J.P.; Thompson, E.N.; Thompson, P.D.; Thompson, P.D.; Thompson, R.J.; Thompson, A.S.; Thomson, E.; Thun, R.P.; Tic, T.; Tikhomirov, V.O.; Tikhonov, Y.A.; Tipton, P.; Tique Aires, F.J.Viegas; Tisserant, S.; Toczek, B.; Todorov, T.; Todorova-Nova, S.; Toggerson, B.; Tojo, J.; Tokar, S.; Tokushuku, K.; Tollefson, K.; Tomasek, L.; Tomasek, M.; Tomoto, M.; Tompkins, L.; Toms, K.; Tonoyan, A.; Topfel, C.; Topilin, N.D.; Torchiani, I.; Torrence, E.; Pastor, E.Torro; Toth, J.; Touchard, F.; Tovey, D.R.; Trefzger, T.; Tremblet, L.; Tricoli, A.; Trigger, I.M.; Trincaz-Duvoid, S.; Trinh, T.N.; Tripiana, M.F.; Triplett, N.; Trischuk, W.; Trivedi, A.; Trocme, B.; Troncon, C.; Trzupek, A.; Tsarouchas, C.; Tseng, J.C-L.; Tsiakiris, M.; Tsiareshka, P.V.; Tsionou, D.; Tsipolitis, G.; Tsiskaridze, V.; Tskhadadze, E.G.; Tsukerman, I.I.; Tsulaia, V.; Tsung, J.W.; Tsuno, S.; Tsybychev, D.; Tuggle, J.M.; Turecek, D.; Turk Cakir, I.; Turlay, E.; Tuts, P.M.; Twomey, M.S.; Tylmad, M.; Tyndel, M.; Uchida, K.; Ueda, I.; Ueno, R.; Ugland, M.; Uhlenbrock, M.; Uhrmacher, M.; Ukegawa, F.; Unal, G.; Undrus, A.; Unel, G.; Unno, Y.; Urbaniec, D.; Urkovsky, E.; Urquijo, P.; Urrejola, P.; Usai, G.; Uslenghi, M.; Vacavant, L.; Vacek, V.; Vachon, B.; Vahsen, S.; Valente, P.; Valentinetti, S.; Valkar, S.; Valladolid Gallego, E.; Vallecorsa, S.; Valls Ferrer, J.A.; Van Berg, R.; van der Graaf, H.; van der Kraaij, E.; van der Poel, E.; van der Ster, D.; van Eldik, N.; van Gemmeren, P.; van Kesteren, Z.; van Vulpen, I.; Vandelli, W.; Vaniachine, A.; Vankov, P.; Vannucci, F.; Vari, R.; Varnes, E.W.; Varouchas, D.; Vartapetian, A.; Varvell, K.E.; Vasilyeva, L.; Vassilakopoulos, V.I.; Vazeille, F.; Vellidis, C.; Veloso, F.; Veneziano, S.; Ventura, A.; Ventura, D.; Venturi, M.; Venturi, N.; Vercesi, V.; Verducci, M.; Verkerke, W.; Vermeulen, J.C.; Vetterli, M.C.; Vichou, I.; Vickey, T.; Viehhauser, G.H.A.; Villa, M.; Villani, E.G.; Villaplana Perez, M.; Vilucchi, E.; Vincter, M.G.; Vinek, E.; Vinogradov, V.B.; Viret, S.; Virzi, J.; Vitale, A.; Vitells, O.; Vivarelli, I.; Vives Vaque, F.; Vlachos, S.; Vlasak, M.; Vlasov, N.; Vogel, A.; Vokac, P.; Volpi, M.; von der Schmitt, H.; von Loeben, J.; von Radziewski, H.; von Toerne, E.; Vorobel, V.; Vorwerk, V.; Vos, M.; Voss, R.; Voss, T.T.; Vossebeld, J.H.; Vranjes, N.; Vranjes Milosavljevic, M.; Vrba, V.; Vreeswijk, M.; Vu Anh, T.; Vudragovic, D.; Vuillermet, R.; Vukotic, I.; Wagner, P.; Walbersloh, J.; Walder, J.; Walker, R.; Walkowiak, W.; Wall, R.; Wang, C.; Wang, H.; Wang, J.; Wang, S.M.; Warburton, A.; Ward, C.P.; Warsinsky, M.; Wastie, R.; Watkins, P.M.; Watson, A.T.; Watson, M.F.; Watts, G.; Watts, S.; Waugh, A.T.; Waugh, B.M.; Weber, M.D.; Weber, M.; Weber, M.S.; Weber, P.; Weidberg, A.R.; Weingarten, J.; Weiser, C.; Wellenstein, H.; Wells, P.S.; Wen, M.; Wenaus, T.; Wendler, S.; Wengler, T.; Wenig, S.; Wermes, N.; Werner, M.; Werner, P.; Werth, M.; Werthenbach, U.; Wessels, M.; Whalen, K.; White, A.; White, M.J.; White, S.; Whitehead, S.R.; Whiteson, D.; Whittington, D.; Wicek, F.; Wicke, D.; Wickens, F.J.; Wiedenmann, W.; Wielers, M.; Wienemann, P.; Wiglesworth, C.; Wiik, L.A.M.; Wildauer, A.; Wildt, M.A.; Wilkens, H.G.; Williams, E.; Williams, H.H.; Willocq, S.; Wilson, J.A.; Wilson, M.G.; Wilson, A.; Wingerter-Seez, I.; Winklmeier, F.; Wittgen, M.; Wolter, M.W.; Wolters, H.; Wosiek, B.K.; Wotschack, J.; Woudstra, M.J.; Wraight, K.; Wright, C.; Wright, D.; Wrona, B.; Wu, S.L.; Wu, X.; Wulf, E.; Wynne, B.M.; Xaplanteris, L.; Xella, S.; Xie, S.; Xu, D.; Xu, N.; Yamada, M.; Yamamoto, A.; Yamamoto, K.; Yamamoto, S.; Yamamura, T.; Yamaoka, J.; Yamazaki, T.; Yamazaki, Y.; Yan, Z.; Yang, H.; Yang, U.K.; Yang, Z.; Yao, W-M.; Yao, Y.; Yasu, Y.; Ye, J.; Ye, S.; Yilmaz, M.; Yoosoofmiya, R.; Yorita, K.; Yoshida, R.; Young, C.; Youssef, S.P.; Yu, D.; Yu, J.; Yuan, L.; Yurkewicz, A.; Zaidan, R.; Zaitsev, A.M.; Zajacova, Z.; Zambrano, V.; Zanello, L.; Zaytsev, A.; Zeitnitz, C.; Zeller, M.; Zemla, A.; Zendler, C.; Zenin, O.; Zenis, T.; Zenonos, Z.; Zenz, S.; Zerwas, D.; della Porta, G.Zevi; Zhan, Z.; Zhang, H.; Zhang, J.; Zhang, Q.; Zhang, X.; Zhao, L.; Zhao, T.; Zhao, Z.; Zhemchugov, A.; Zhong, J.; Zhou, B.; Zhou, N.; Zhou, Y.; Zhu, C.G.; Zhu, H.; Zhu, Y.; Zhuang, X.; Zhuravlov, V.; Zimmermann, R.; Zimmermann, S.; Zimmermann, S.; Ziolkowski, M.; Zivkovic, L.; Zobernig, G.; Zoccoli, A.; zur Nedden, M.

    2010-01-01

    The ATLAS Inner Detector is a composite tracking system consisting of silicon pixels, silicon strips and straw tubes in a 2 T magnetic field. Its installation was completed in August 2008 and the detector took part in data- taking with single LHC beams and cosmic rays. The initial detector operation, hardware commissioning and in-situ calibrations are described. Tracking performance has been measured with 7.6 million cosmic-ray events, collected using a tracking trigger and reconstructed with modular pattern-recognition and fitting software. The intrinsic hit efficiency and tracking trigger efficiencies are close to 100%. Lorentz angle measurements for both electrons and holes, specific energy-loss calibration and transition radiation turn-on measurements have been performed. Different alignment techniques have been used to reconstruct the detector geometry. After the initial alignment, a transverse impact parameter resolution of 22.1+/-0.9 {\\mu}m and a relative momentum resolution {\\sigma}p/p = (4.83+/-0.16)...