WorldWideScience

Sample records for metropolitan planning commission

  1. Metropolitan Transportation Commission, San Francisco Bay area : developing regional objectives and performance measures to improve system operations

    Science.gov (United States)

    2009-04-01

    The Metropolitan Transportation Commission (MTC) uses an objectives-driven, performance-based approach in its transportation planning for the San Francisco Bay Area. This approach focuses attention on transportation investments of highest priority. T...

  2. Metropolitan planning from an international comparative perspective

    DEFF Research Database (Denmark)

    Galland, Daniel; Grønning, Marius

    2016-01-01

    policies, and thus also to the instrumental orientation within planning. A challenge stemming from this comparison is to understand how similar policies are implemented at a strategic and metropolitan level. Within the institutional framework of Copenhagen, the problem with the Finger Plan directive might...... (Faludi & van der Valk, 1994), thus integrating the archetypal land-use character of municipal plans and the strategic and growth-oriented pursuit of regional plans. A number of questions may be deduced: How explicit is the metropolitan scale? How local and how regional is the knowledge basis? Within......Over the last few years new practices of spatial strategy making at different planning scales have emerged. At the metropolitan level, such spatial strategies are reminiscent of national and supranational competitive strategies (e.g. EU policies) as well as ratifications of international...

  3. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  4. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  5. National Capital Planning Commission Meeting Transcripts

    Data.gov (United States)

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  6. National Capital Planning Commission Library contents

    Data.gov (United States)

    National Capital Planning Commission — The National Capital Planning Commission library catalog is a compilation of titles, authors, years of publication and topics of books, reports and NCPC publications.

  7. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Science.gov (United States)

    2010-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  8. Statewide and Metropolitan Transportation Planning Processes : a TPCB Peer Exchange

    Science.gov (United States)

    2016-04-20

    This report highlights key recommendations and noteworthy practices identified at Statewide and Metropolitan Transportation Planning Processes Peer Exchange held on September 9-10, 2015 in Shepherdstown, West Virginia. This event was sponsored ...

  9. Planning Assignments of the Italian Metropolitan Cities. Early Trends

    Directory of Open Access Journals (Sweden)

    Giuseppe Mazzeo

    2017-04-01

    Full Text Available The last stage of the process of establishment of the Italian Metropolitan Cities, which took place in 2014, follows of a few decades the start of this institutional reform. In 1990, in fact, the Act 142 (Local Autonomies Reform had planned metropolitan areas as the administrative organization more suitable to provide these territories of structures for the management and the strategic development alike the best international models. The paper proposes to analyse the first activities taken by the Italian Metropolitan Cities in the sector of territorial government, three years after the enactment in 2014 of Act nr. 56.  Focal point of the analysis is the jurisdiction in the formation of two plans (the Strategic Plan and the Metropolitan Territorial Plan and the following relationships among them, in the logical assumption that between them a necessary and strict consistency there should be. In the first part, the paper analyses some factors characterizing the metropolitan areas and the functions that the law assigns to the new institution in the territorial government sector. The second part outlines the updated situation with regard to the formation of the sectoral tools (Strategic Plan, Territorial Plan and homogeneous zones. The third part analyses the progresses in three Metropolitan Cities taken as sample (Milan, Genoa and Bologna and, in general, to those of Southern Italy. In the last part, the paper exposes some considerations regarding the issues raised in the article, particularly about the innovativeness of the tools and the timeline for the implementation of the act.

  10. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-08-29

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... to the Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the..., Sacramento Metropolitan Air Quality Management District, Rule 214 (Federal New Source Review), Rule 203...

  11. 23 CFR 450.336 - Applicability of NEPA to metropolitan transportation plans and programs.

    Science.gov (United States)

    2010-04-01

    ... the Secretary concerning a metropolitan transportation plan or TIP developed through the processes... 23 Highways 1 2010-04-01 2010-04-01 false Applicability of NEPA to metropolitan transportation... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and...

  12. Is Urban Planning in Australia Hindered by Poor Metropolitan Governance?

    Directory of Open Access Journals (Sweden)

    Paul Burton

    2017-11-01

    Full Text Available There are many calls for urban planning in Australia to be reformed, although often in contradictory ways. For example, some argue it should be capable of delivering greater certainty to developers while others call for more flexibility in processes of urban development regulation; some would like to roll back its regulatory impact while others argue for a renewal of planning’s commitment to promoting social and spatial justice. The Australian planning system is also held to be hindered by a comparative lack of planning at and for the metropolitan scale. This is connected to the absence of well-developed structures of metropolitan governance in what is a three-tier federal system, with most power over planning concentrated at the State and Territory government scale. The paper explores this putative hindrance by considering three important issues in Australian urban policy debates about the efficacy of contemporary multi-level governance arrangements: spatial scale; identity and legitimacy; and efficiency and effectiveness. It includes some analysis of the case made for a more explicit and rigorous national urban policy and how this might relate to lower level planning regimes. The paper focuses on recent urban policy and planning initiatives in South East Queensland, one of Australia’s fastest growing metropolitan regions, and concludes that while incremental but nonetheless significant improvements in planning policy and practice are possible, these are unlikely to satisfy those calling for more radical changes to improve the Australian planning system.

  13. Analysing contemporary metropolitan spatial plans in Europe through their institutional context, instrumental content and planning process

    DEFF Research Database (Denmark)

    Elinbaum, Pablo; Galland, Daniel

    2016-01-01

    This article sets out to propose and apply a qualitative framework for thinking about how to analyze and compare metropolitan spatial plans in a milieu of divergent spatial planning traditions and discretionary planning practices. In doing so, the article reviews and develops an understanding...... concerning the institutional context, instrumental content and planning processes associated with four contemporary metropolitan spatial plans in Europe, namely London, Copenhagen, Paris and Barcelona. Through the results of a multiple case study and a subsequent cross comparative analysis, the article...... stresses that contemporary metropolitan spatial plans tend to merge characteristics associated with project-based and strategy-based spatial plans, thus contrasting with the typical land-use character of municipal plans and the often strategic, growth-oriented pursuit of regional plans in Europe...

  14. Urbanisation, urban growth and planning in the Copenhagen Metropolitan Region

    DEFF Research Database (Denmark)

    Fertner, Christian

    pressure. Growth management strategies are necessary to secure future balanced and sustainable development throughout the whole urban region. The analysis of urbanisation and urban growth in peri-urban areas is at the core of this study, including socio-demographic and functional dynamics, land use impacts...... and options for spatial planning. The main case was the metropolitan region of Copenhagen, Denmark. Other cases from Europe and the USA were used as reference studies. The methods included quantitative analyses of register and land use data as well as general case study work to investigate options for spatial...... planning. The study shows that, while the most visible impacts of land use changes can be found at the close urban fringe, many other dynamics have a much longer reach into the rural-urban region. In the Copenhagen metropolitan region, we can observe migration to peri-urban areas and to the urban core...

  15. 75 FR 40726 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION... Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD...

  16. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Sacramento Metropolitan Air Quality...

  17. Metropolitan planning organizations and transportation planning for megaregions

    Science.gov (United States)

    2014-12-01

    Planning transportation across jurisdictions is a challenge faced in geographic areas throughout the U.S. Researchers identify megaregions as the sub-set of major regions, often multi-state, with the most significant transportation challenges, opport...

  18. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... sources within the areas covered by the plan as necessary to assure that the National Ambient Air Quality...

  19. 23 CFR 420.109 - What are the requirements for distribution of metropolitan planning funds?

    Science.gov (United States)

    2010-04-01

    ... and Research Funds § 420.109 What are the requirements for distribution of metropolitan planning funds... 23 Highways 1 2010-04-01 2010-04-01 false What are the requirements for distribution of metropolitan planning funds? 420.109 Section 420.109 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF...

  20. The New England Drought Study: Water Resources Planning Metropolitan Boston, Massachusetts

    National Research Council Canada - National Science Library

    Joyce, Charles

    1994-01-01

    The study has traced the water resources planning experience for the metropolitan Boston area from the 17th century to the present in order to investigate how current planning has evolved from seeking...

  1. Can Maine metropolitan planning organizations (MPOs) finance transportation projects through bond financing?

    Science.gov (United States)

    2008-12-01

    In January 2008 the Maine metropolitan planning organizations (MPOs) requested the Transportation : Research Division of the Maine Department of Transportation to conduct research to determine if it is : possible for MPOs to finance projects through ...

  2. Metropolization Process for enhancing local and regional planning : an experience of cirebon metropolitan, West Java

    Science.gov (United States)

    Supriyadi Rustidja, E.

    2018-03-01

    Metropolitan develops in line with resource utilization, investment, and transactions of regional activities. Metropolization of an area gives emerge urban economy that changes the situation, form, and pattern of urban space interactions. On the other hand, metropolism concerns the strategy of changing variation of urban space, so that metropolitan invasion not only form of urban space but also the process of interaction among stakeholders in developing metropolitan area. Based on participatory research, this article explores metropolitan invasion process for enhancing local and regional planning, both indigenous and intrusive cataclysmic. The study find that the primeval, rural, and urban as elemental environment must be considered in developing metropolitan, not merely form the structure and pattern of urban space. The metropolization process also requires the strategic of rural urban linkage, context setting and local assessment, strategic community investment, and interculturalist approach. The other findings of the study show that metropolization in Cirebon Metropolitan, West Java emphasizing on promotion of competitiveness strategy, value chain urban activities, and networking of urban areas. Cirebon Metropolitan must promote the realization of growth centers and connect the interregional activities of metropolitan area for providing sustainable economic growth.

  3. U.S. Nuclear Regulatory Commission human factors program plan

    International Nuclear Information System (INIS)

    1986-04-01

    The purpose of the U.S. Nuclear Regulatory Commission (NRC) Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design and operation of nuclear facilities. This revised plan addresses human factors issues related to the operation of nuclear power plants (NPPs). The three issues of concern are (1) the activities planned to provide the technical bases to resolve the remaining tasks related to human factors as described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the need to address the additional human factors efforts that were identified during implementation of the Action Plan; and (3) the actual fulfillment of those developmental activities specified in Revision 1 of this plan. The plan represents a systematic approach for addressing high priority human factors concerns important to NPP safety in FY 1986 through 1987

  4. New Orleans Regional Planning Commission scenario planning workshop : sponsored by the Federal Highway Administration

    Science.gov (United States)

    2016-05-01

    This report summarizes noteworthy practices and key recommendations shared during a scenario planning workshop, hosted by the New Orleans Regional Planning Commission, on August 12-13, 2015, in New Orleans, Louisiana. The Federal Highway Administrati...

  5. Gulf Regional Planning Commission scenario planning workshop : sponsored by the Federal Highway Administration

    Science.gov (United States)

    2016-03-01

    This report summarizes noteworthy practices shared during a scenario planning workshop, hosted by the Gulf Regional Planning Commission, on March 15-16, 2016, in Biloxi, Mississippi. The Federal Highway Administration (FHWA) sponsored this event as p...

  6. A computerized model for integrating the physical environmental factors into metropolitan landscape planning

    Science.gov (United States)

    Julius Gy Fabos; Kimball H. Ferris

    1977-01-01

    This paper justifies and illustrates (in simplified form) a landscape planning approach to the environmental management of the metropolitan landscape. The model utilizes a computerized assessment and mapping system, which exhibits a recent advancement in computer technology that allows for greater accuracy and the weighting of different values when mapping at the...

  7. Recognition of management structure and spatial planning in Tehran metropolitan area

    Directory of Open Access Journals (Sweden)

    Manijeh Lalehpour

    2016-06-01

    Full Text Available Metropolitan areas are concentrated and dense areas filled settlements and include a central urban region with its surrounding residences. Severity and complexity of issues in metropolitan areas along with intricacy and quantity of influential factors in these areas necessitate novel approaches and innovative solutions for comprehensive strategies and management coordination of land use in these regions. The present study has taken this approach to investigate management structure and spatial planning in Tehran metropolitan area. The study takes parameters like political and management decentralization, elements affecting urban management based on the sources of power and province and finally spatial domain of urban management into account. Findings revealed that decentralization in national management and political structure has limited tasks and authority of urban management. In this regard, a closer look at management structure and spatial planning of Tehran metropolitan are demonstrates that the government and its element dominate policy making, planning and spatial management of the city and inherent position of municipality and city council suffer weaknesses in their role as urban management. Results from investigating official tasks in urban management elements and their spatial domain reveals lack of coordination and Fragmentation in management structure and spatial planning in the region. The paper attempts to discuss these Fragmentation in the fields of management, function, politics and domains.

  8. Wilmington Area Planning Council, New Castle County, Delaware and Cecil County, Maryland : a performance-based approach to integrating congestion management into the metropolitan planning process

    Science.gov (United States)

    2009-04-01

    The Wilmington Area Planning Council takes an objectives-driven, performance-based approach to its metropolitan transportation planning, including paying special attention to integrating its Congestion Management Process into its planning efforts. Th...

  9. Consideration of the 15 Factors in the Metropolitan Planning Process

    Science.gov (United States)

    1995-01-01

    This synthesis will be of immediate interest to land luse and transportation : planning officials, with special interest to state, regional, and local planners : and administrators who must repond to the requirements of the Intermodal Surface : Trans...

  10. Development of a commissioning plan for the APT linac

    International Nuclear Information System (INIS)

    Funk, L.W.; Crandall, K.R.; Gilpatrick, J.D.; Gray, E.R.; Regan, A.H.; Rohlev, A.; Rybarcyk, L.J.; Wangler, T.P.

    1998-01-01

    The Accelerator Production of Tritium (APT) facility is based on a linac which incorporates both normal-conducting and superconducting RF technology and accelerates a 100-mA cw proton beam to an energy of 1,030 MeV or higher, depending on the desired production rate. Commissioning plans to achieve full power operation with minimum beam-induced activation of components have been evolving. This paper presents the main issues and the basic approaches that are now being discussed

  11. Subsurface information for risk-sensitive urban spatial planning in Dhaka Metropolitan City, Bangladesh

    Science.gov (United States)

    Günther, Andreas; Aziz Patwary, Mohammad Abdul; Bahls, Rebecca; Asaduzzaman, Atm; Ludwig, Rüdiger; Ashraful Kamal, Mohammad; Nahar Faruqa, Nurun; Jabeen, Sarwat

    2016-04-01

    Dhaka Metropolitan City (including Dhaka and five adjacent municipal areas) is one of the fastest developing urban regions in the world. Densely build-up areas in the developed metropolitan area of Dhaka City are subject to extensive restructuring as common six- or lower storied buildings are replaced by higher and heavier constructions. Additional stories are built on existing houses, frequently exceeding the allowable bearing pressure on the subsoil as supported by the foundations. In turn, newly developing city areas are projected in marshy terrains modified by extensive, largely unengineered landfills. In most areas, these terrains bear unfavorable building ground conditions within 30 meters. Within a collaborative technical cooperation project between Bangladesh and Germany, BGR supports GSB in the provision of geo-information for the Capital Development Authority (RAJUK). For general urban planning, RAJUK successively develops a detailed area plan (DAP) at scale 1 : 50000 for the whole Dhaka Metropolitan City area (approx. 1700 km2). Geo-information have not been considered in the present DAP. Within the project, geospatial information in form of a geomorphic map, a digital terrain model and a 3-D subsurface model covering the whole city area have been generated at a scale of 1 : 50000. An extensive engineering geological data base consisting of more than 2200 borehole data with associated Standard Penetration Testing (SPT) and lab data has been compiled. With the field testing (SPT) and engineering geological lab data, the 3-D subsurface model can be parameterized to derive important spatial subsurface information for urban planning like bearing capacity evaluations for different foundation designs or soil liquefaction potential assessments for specific earthquake scenarios. In conjunction with inundation potential evaluations for different flooding scenarios, comprehensive building ground suitability information can be derived to support risk

  12. Supporting strategic spatial planning : planning support systems for the spatial planning of metropolitan landscapes

    NARCIS (Netherlands)

    Carsjens, G.J.

    2009-01-01

    Een belangrijke opgave voor de ruimtelijke planning is en balans te vinden tussen de toegenomen druk op de open groene ruimte door verstedelijking en economische ontwikkeling enerzijds, en de noodzaak van het behouden van deze landelijke gebieden voor natuur, recreatie, landschap en voedselproductie

  13. An exploratory study of healthcare strategic planning in two metropolitan areas.

    Science.gov (United States)

    Begun, James W; Kaissi, Amer A

    2005-01-01

    Little is known about empirical variation in the extent to which healthcare organizations conduct formal strategic planning or the extent to which strategic planning affects performance. Structural contingency and complexity science theory offer differing interpretations of the value of strategic planning. Structural contingency theory emphasizes adaptation to achieve organizational fit with a changing environment and views strategic planning as a way to chart the organization's path. Complexity science argues that planning is largely futile in changing environments. Interviews of leaders in 20 healthcare organizations in the metropolitan areas of Minneapolis/St. Paul, Minnesota, and San Antonio, Texas, reveal that strategic planning is a common and valued function in healthcare organizations. Respondents emphasized the need to continuously update strategic plans, involve physicians and the governing board, and integrate strategic plans with other organizational plans. Most leaders expressed that strategic planning contributes to organizational focus, fosters stakeholder participation and commitment, and leads to achievement of strategic goals. Because the widespread belief in strategic planning is based largely on experience, intuition, and faith, we present recommendations for developing an evidence base for healthcare strategic planning.

  14. Implementing the Green City Policy in Municipal Spatial Planning: The Case of Buffalo City Metropolitan Municipality

    Directory of Open Access Journals (Sweden)

    Abongile Dlani

    2015-06-01

    Full Text Available The term “eco-city,” and similar concepts such as “green” and “sustainable” cities, has evolved overtime concurrent to the development of the understanding of social change and mankind’s impact on environmental and economic health. With the advent of climate change impacts, modern economies developed the green city policy to create sustainable urban development, low emission, and environmentally friendly cities. In South Africa municipalities, including Buffalo City Metropolitan Municipality (BCMM have been tasked to and implement the green city policy. However, BCMM is yet to develop the green city policy that clearly articulate how the municipality will combat climate change and reduce its Green House Gases (GHG emissions in its spatial planning designs. Against this background, this article reviews and analyses green policy landscape in Metropolitan Municipalities. It is envisaged that the research will provide the basis for the development of a comprehensive green policy strategies and programmes for the local transition to action in Buffalo City Metropolitan Municipality, in the Eastern Cape Province.

  15. Capital District Transportation Committee Albany, New York : planning the congestion management process in the context of metropolitan transportation planning goals and objectives

    Science.gov (United States)

    2009-04-01

    The Capital District Transportation Committee (CDTC) uses a broad and integrated approach for transportation planning in the Albany-Schenectady-Troy (New York) metropolitan area. This approach encompasses issues critical to the future of the Capital ...

  16. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  17. 77 FR 15142 - Updated Nuclear Regulatory Commission Fiscal Years 2008-2013 Strategic Plan

    Science.gov (United States)

    2012-03-14

    ... 2008-2013 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Strategic plan. SUMMARY: The U...-1614, Volume 5, ``U.S. Nuclear Regulatory Commission, Fiscal Years [FY] 2008-2013 Strategic Plan,'' dated February 2012. The updated FY 2008-2013 strategic plan describes the agency's mission and...

  18. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Science.gov (United States)

    2011-10-04

    ...-2016 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment... comment on draft NUREG-1614, Volume 5. ``U.S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and...

  19. Theory of planned behavior applied to fish consumption in modern Metropolitan Lima

    Directory of Open Access Journals (Sweden)

    Angie HIGUCHI

    Full Text Available Abstract Despite being an important source of protein, fish consumption in Peru is low compared with other coastal countries. Thus, the objective of this study is to identify the core determinants of such consumption. We based our analysis on the framework provided by the Theory of Planned Behavior (TPB where attitudes, subjective norms, past experience and health involvement determine the intention and frequency of fish consumption. Primary data were gathered through 159 consumers of fish in modern Metropolitan Lima between August and October 2015. From a set of likert scale indicators a structural model was specified to evaluate the relationships given by the theoretical framework of the TPB. The results showed that the intention to eat fish is determined by personal attitudes, norms and past experience, and as expected, intention itself causes the frequency of fish consumption. Nonetheless, although consumers’ interest in healthy eating was shown to positively influence fish consumption behavior by theory, Metropolitan Lima fish consumers seem to be not concerned by positive health attributes related to fish consumption. These results may have important implications on production decisions, sales and marketing for the promotion of fish in Lima as a means of economic development.

  20. Urban sustainability through strategic planning: A case of metropolitan planning in Khulna city, Bangladesh

    Directory of Open Access Journals (Sweden)

    Md. Ashiq Ur Rahman

    2016-06-01

    Full Text Available Planning is a crucial element for any development initiative. Planning entails choice making in pursuit of stated goals e.g. improving living conditions for individuals and societies. Planning initiatives are employed within social systems that are governed by institution, and planning intervenes with and may reconfigure these institutions resulting in social change. This paper discusses how urban sustainability can be achieved through strategic action in urban development by analysing the planning process of Khulna city, Bangladesh. This paper reviews different scholarly articles to draw a conceptual framework for identifying the interface of strategic planning, components of strategic action planning and urban sustainability. Based on this conceptual framework this paper identifies the scope of achieving urban sustainability through analysing the current planning practice of Khulna city, Bangladesh. This paper identifies that though the Khulna city plan adopted the approach of strategic planning but it failed to comply with its theoretical notion to achieve the issues related to urban sustainability. Analysis reveals that in terms of social attribute that recognizes the interest of different group of people the exiting planning packages is not sustainable. Similar phenomenon have been observed in terms of recognition of gender and marginalized people in planning, equitable provision of income and employment generation, peoples’ participation in planning and polices for ensuring equitable access to infrastructure services. Therefore the existing planning package of Khulna city failed to achieve the issues of urban sustainability through its adapted strategic planning approach.

  1. Scenario-based transportation planning with involvement of metropolitan planning organizations.

    Science.gov (United States)

    2009-01-01

    The Office of Virginia's Secretary of Transportation identified 21 transportation policies and 42 performance criteria in Virginia's long-range multimodal transportation plan, VTrans2025. A subsequent planning effort, VTrans2035, provided direction f...

  2. Suburban landscape assessment applied to urban planning. Case study in Barcelona Metropolitan Region

    Directory of Open Access Journals (Sweden)

    David Serrano Giné

    2015-12-01

    Full Text Available Urban fringes set complex landscapes, in transition from rural to natural and urban, with fuzzy boundaries in mutual interdependence. The European Landscape Convention gives notorious importance to everyday landscapes, including those of suburban character. Few landscape evaluation researches are done in suburban areas, which is surprising considering its importance and abundance. This paper shows a methodology, yield on geographical information systems (GIS, for landscape assessment of suburban areas, useful in urban planning. Its main interest lies in a double assessment, which considers both landscape quality and landscape fragility, applied systematically. The procedure is applied in Muntanyes d’Ordal in the metropolitan area of Barcelona (Spain, an area with pronounced regional strengths and contrasted landscape values. Results are of important applicability and indicate a predominance of mean values, both for landscape quality and landscape fragility.

  3. Water-resources-related information for the Milwaukee Metropolitan Sewerage District planning area, Wisconsin, 1970-2002

    Science.gov (United States)

    Schneider, Morgan A.; Lutz, Michelle A.; ,

    2004-01-01

    The Milwaukee Metropolitan Sewerage District (MMSD) Corridor Study is a three-phase project designed to improve the understanding of water resources in the stream corridors of the MMSD planning area by initially compiling existing data and using the compiled information to develop 3-year baseline and long-term monitoring plans. This report is one of the products of Phase I of the Corridor Study.

  4. Commissioning and quality assurances of the CMS XIO radiotherapy treatment planning system for external beam photons

    International Nuclear Information System (INIS)

    Muralidhar, K.R.; Anurupa; Soubhagya; Sudhakar; Shiva; Krishnam Raju, A.; Narayana Murthy, P.

    2008-01-01

    The commissioning of XIO treatment planning system (TPS) was carried out by Computerized Medical Devices, USA for Siemens and Elekta linear accelerators. The Commissioning and quality assurance of the CMS XIO radiotherapy treatment planning system involves many steps, beginning from beam data acquisition and entry into the computerized TPS, through patient data acquisition, to treatment plan generation and the final transfer of data to the treatment machine and quality assurance of TPS

  5. Urban food security at the crossroads between metropolitan food planning and global trade

    NARCIS (Netherlands)

    Wascher, Dirk Michael; Jeurissen, Leonne

    2017-01-01

    Making use of Life Cycle Thinking, the Metropolitan Foodscape Planner (MFP) tool provides ecological footprint maps and supply/demand data showing a large potential for metropolitan food supplies. In the discussion, we examine these results in the light of recent research on the impacts of the

  6. Urbanisation, urban growth and planning in the Copenhagen Metropolitan Region with reference studies from Europe and the USA

    DEFF Research Database (Denmark)

    Fertner, Christian

    pressure. Growth management strategies are necessary to secure future balanced and sustainable development throughout the whole urban region. The analysis of urbanisation and urban growth in peri-urban areas is at the core of this study, including socio-demographic and functional dynamics, land use impacts...... and options for spatial planning. The main case was the metropolitan region of Copenhagen, Denmark. Other cases from Europe and the USA were used as reference studies. The methods included quantitative analyses of register and land use data as well as general case study work to investigate options for spatial...... planning. The study shows that, while the most visible impacts of land use changes can be found at the close urban fringe, many other dynamics have a much longer reach into the rural-urban region. In the Copenhagen metropolitan region, we can observe migration to peri-urban areas and to the urban core...

  7. US Nuclear Regulatory Commission human-factors program plan

    International Nuclear Information System (INIS)

    1983-08-01

    The purpose of the NRC Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This initial plan addresses nuclear power plants (NPP) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements, and (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-83 through FY-85 time frame

  8. 11 CFR 116.7 - Debt settlement plans filed by terminating committees; Commission review.

    Science.gov (United States)

    2010-01-01

    ... description of the terms under which the creditor has extended credit to nonpolitical debtors of similar risk... settlement plan after the creditors included in the debt settlement plan have agreed to the settlement or... payments to the creditors included in the debt settlement plan until completion of Commission review. The...

  9. Agricultural and green infrastructures: The role of non-urbanised areas for eco-sustainable planning in a metropolitan region

    International Nuclear Information System (INIS)

    La Greca, Paolo; La Rosa, Daniele; Martinico, Francesco; Privitera, Riccardo

    2011-01-01

    Non-Urbanised Areas (NUAs) are part of agricultural and green infrastructures that provide ecosystem services. Their role is fundamental for the minimization of urban pollution and adaptation to climate change. Like all natural ecosystems, NUAs are endangered by urban sprawl. The regulation of sprawl is a key issue for land-use planning. We propose a land use suitability strategy model to orient Land Uses of NUAs, based on integration of Land Cover Analysis (LCA) and Fragmentation Analysis (FA). With LCA the percentage of evapotranspiring surface is defined for each land use. Dimensions and densities of NUAs patches are assessed in FA. The model has been developed with Geographical Information Systems, using an extensive set of geodatabases, including orthophotos, vectorial cartographies and field surveys. The case of the municipality of Mascalucia in Catania metropolitan area (Italy), characterized by a considerable urban sprawl, is presented. - Highlights: → Non-Urbanised Areas (NUAs) are crucial for land planning and pollution minimization. → NUAs are endangered by urban sprawl in Catania metropolitan areas (Italy). → NUAs can be characterized by Land Cover and Fragmentation analysis. → Results from analysis are used in a Land Use Suitability Strategy Model (LUSSM). → By LUSSM application seven new prospective land uses for NUAs are proposed. - Characterization of non-urbanised areas in metropolitan regions is crucial for land-use planning aimed at environmental pollution minimization.

  10. Agricultural and green infrastructures: The role of non-urbanised areas for eco-sustainable planning in a metropolitan region

    Energy Technology Data Exchange (ETDEWEB)

    La Greca, Paolo; La Rosa, Daniele [Dipartimento di Architettura e Urbanistica, Universita di Catania, Viale A. Doria 6, 95125 Catania (Italy); Martinico, Francesco, E-mail: fmartinico@dau.unict.it [Dipartimento di Architettura e Urbanistica, Universita di Catania, Viale A. Doria 6, 95125 Catania (Italy); Privitera, Riccardo [Dipartimento di Architettura e Urbanistica, Universita di Catania, Viale A. Doria 6, 95125 Catania (Italy)

    2011-08-15

    Non-Urbanised Areas (NUAs) are part of agricultural and green infrastructures that provide ecosystem services. Their role is fundamental for the minimization of urban pollution and adaptation to climate change. Like all natural ecosystems, NUAs are endangered by urban sprawl. The regulation of sprawl is a key issue for land-use planning. We propose a land use suitability strategy model to orient Land Uses of NUAs, based on integration of Land Cover Analysis (LCA) and Fragmentation Analysis (FA). With LCA the percentage of evapotranspiring surface is defined for each land use. Dimensions and densities of NUAs patches are assessed in FA. The model has been developed with Geographical Information Systems, using an extensive set of geodatabases, including orthophotos, vectorial cartographies and field surveys. The case of the municipality of Mascalucia in Catania metropolitan area (Italy), characterized by a considerable urban sprawl, is presented. - Highlights: > Non-Urbanised Areas (NUAs) are crucial for land planning and pollution minimization. > NUAs are endangered by urban sprawl in Catania metropolitan areas (Italy). > NUAs can be characterized by Land Cover and Fragmentation analysis. > Results from analysis are used in a Land Use Suitability Strategy Model (LUSSM). > By LUSSM application seven new prospective land uses for NUAs are proposed. - Characterization of non-urbanised areas in metropolitan regions is crucial for land-use planning aimed at environmental pollution minimization.

  11. Status and plans for Linac4 installation and commissioning

    CERN Document Server

    Vretenar, M; Arnaudon, L; Baudrenghien, P; Bellodi, G; Broere, J; Brunner, O; Comblin, J F; Coupard, J; Dimov, V A; Fuchs, J F; Funken, A; Gerigk, F; Granemann Souza, E; Hanke, K; Hansen, J; Yarmohammadi Satri, M; Kozsar, I; Lallement, J B; Lenardon, F; Lettry, J; Lombardi, A M; Maglioni, C; Midtun, O; Mikulec, B; Nisbet, D; Paoluzzi, M; Raich, U; Ramberger, S; Roncarolo, F; Rossi, C; Sanchez Alvarez, J L; Scrivens, R; Tan, J; Valerio-Lizarraga, C A; Vollaire, J; Wegner, R; Weisz, S; Zocca, F

    2014-01-01

    Linac4 is a normal conducting 160 MeV Hˉ linear accelerator presently being installed and progressively commissioned at CERN. It will replace the ageing 50 MeV Linac2 as injector of the PS Booster (PSB), increasing at the same time its brightness by a factor of two thanks to the higher injection energy. This will be the first step of a program to increase the beam brightness in the LHC injectors for the needs of the High-Luminosity LHC project. After a series of beam measurements on a dedicated test stand the 3 MeV Linac4 front-end, including ion source, RFQ and a beam chopping line, has been recommissioned at its final position in the Linac4 tunnel. Commissioning of the following section, the Drift Tube Linac, is starting. Beam commissioning will take place in steps of increasing energy, to reach the final 160 MeV in 2015. An extended beam measurement phase including testing of stripping equipment for the PSB and a year-long test run to assess and improve Linac4 reliability will take place in 2016, prior to...

  12. The New England Drought Study: Water Resources Planning Metropolitan Boston, Massachusetts

    National Research Council Canada - National Science Library

    Joyce, Charles

    1994-01-01

    .... The drought of the 1960s precipitated a debate between the operators of the metropolitan Boston water system and interested citizens and citizens' groups, who were opposed to a structural solution...

  13. Integrating Metropolitan Planning Organizations into the State's Highway Safety Improvement Program (HSIP) : Proceedings from the Federal Highway Administration's Peer-to-Peer Exchange Program

    Science.gov (United States)

    2010-06-01

    This report provides a summary of a peer exchange sponsored by the Association of New York State Metropolitan Planning Organizations (NYSMPO) and the New York State Department of Transportation (NYSDOT). It also includes proposed next steps developed...

  14. US Nuclear Regulatory Commission Human Factors Program Plan. Revision 1

    International Nuclear Information System (INIS)

    1984-09-01

    The purpose of the NRC Human Factors Program Plan (NUREG-0985) is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This revised plan addresses nuclear power plants (NPPs) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, THE NRC Action Plan developed as a result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention; (3) conduct of developmental activities specified in NUREG-0985 during FY-83; and (4) the impact of Section 306 of the Nuclear Waste Policy Act of 1982, PL 97-425. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-84 through FY-86 time frame

  15. Commissioning and acceptance testing of Cadplan plus- a 3D treatment planning system

    International Nuclear Information System (INIS)

    Malhotra, H.K.; Kinhikar, R.K.; Deshpande, D.D.; Dinshaw, K.A.

    2000-01-01

    3D treatment planning systems are finding wide acceptance in the radiotherapy community due to their improved dose calculation accuracy as well as the 3D visualization tools. Cadplan plus, a 3D treatment planning system from Varian, has been commissioned at the Tata Memorial Hospital in accordance to various international guidelines

  16. Municipal community gardens in the metropolitan area of Milano. Assessment and planning criteria

    Directory of Open Access Journals (Sweden)

    Giulio Senes

    2016-06-01

    Full Text Available A community garden (CG can generally be defined as a piece of land gardened collectively by a group of people that grow their produce on shared lots that have been divided into smaller plots. Some gardens are grown collectively, are divided into different plots for individual and family use; CGs are usually located in urban or peri-urban areas. As a growing portion of the urban open space network, CGs are contributing to land preservation, access to open space, and sustainable re-use of vacant land. They promote healthy communities and provide food security for many. In this context, the object of the study are the municipal community gardens (MCGs, a specific typology of CGs provided for land-use planning legislation and practice as an urban service with social function, made available to the community by the municipalities and assigned to be cultivated to citizens (usually seniors/retired people. In particular, the study aimed: i to evaluate the presence of MCGs in the città metropolitana di Milano (the former province of Milano; and ii to define criteria for new MCGs settlement, using existing geo-database and geographical information system to make it replicable in other settings. For the first topic the 133 municipalities of the former province of Milano (excluded the city of Milano were analysed. Only 59 municipalities had presence of MCGs. The average area per capita of MCGs is 0.68 sq.m/inhab. (if we exclude Rodano, an outlier with 35 sq.m/inhab.. An overlay with land use map has permitted to define the relationships between the MCGs and their surrounding territory. The major part of MCGs are included in urban or suburban areas. For the second goal, the land area to be allocated for new MCGs was assessed for each municipality, comparing area of existing MCGs and a minimum required area (calculated on the basis of the inhabitants number. Finally a method was proposed to locate the new MCGs areas. Criteria used to identify suitable areas

  17. Quality of runoff from small watersheds in the Twin Cities Metropolitan Area, Minnesota - A project plan

    Science.gov (United States)

    Ayers, M.A.; Payne, G.A.; Oberts, Gary L.

    1980-01-01

    A program of water-quality sampling to define the relationships between land use, watershed characteristics, and the quantity, quality, and timing of runoff has been started for the Twin Cities metropolitan area of Minnesota. Ten major watersheds were chosen as representative of conditions in the metropolitan area. Each will be sampled at one location near the outlet. Six of the watersheds are agricultural and range in size from 14.3 to 82.9 square miles. The four remaining watersheds are urbanized and range in size from 1.22 to 31.7 square miles. In addition, seven urban subwatersheds, which range in size from 0.12 to 0.47 square miles and reflect a dominant land-use type, will be sampled.

  18. Metropolitan water management

    National Research Council Canada - National Science Library

    Milliken, J. Gordon; Taylor, Graham C

    1981-01-01

    This monograph is intended to inform interested and capable pesons, who happen not to be specialists in water resources planning, of the issues and alternative strategies related to metropolitan water supply...

  19. British Columbia Utilities Commission service plan 2004/2005 - 2006/2007

    International Nuclear Information System (INIS)

    2004-01-01

    The mandate of the British Columbia Utilities Commission (BCUC) is to ensure that customers receive safe, reliable and non-discriminatory energy services at fair rates from the utilities. It must also ensure that the shareholders of the utilities have a reasonable opportunity to earn a fair return on the invested capital. This report describes the following six key areas that underlie the Commission's strategic planning for the next 3 years: (1) regulation of automobile insurance, (2) energy policy implementation, (3) natural gas commodity costs, (4) commercial unbundling and customer choice, (5) energy trade, and (6) benchmarking. The report also describes strategic issues with reference to priorities, shifts and risk management. Alignment with the government's strategic plan was also reviewed. The financial outlook for 2003/04 and 2006/07 shows that the Commission intends to fully recover costs from the utilities it regulates. The budget for 2003/04 has increased somewhat from the forecasted amount for the same period reported in the previous year's service plan. This is due to an expanded mandate. Forecast values for the 2004/05 and 2005/06 planning periods have decreased slightly compared to the previous year's plan. tabs., figs

  20. Canadian Nuclear Safety Commission 2003-2004 estimates. Part III - report on plans and priorities

    International Nuclear Information System (INIS)

    2003-01-01

    The Commission replace the Atomic Energy Control Board in 2000 as Canada's independent agency which regulates the use of nuclear energy and materials to protect health, safety, security, and the environment. This report is an individual expenditure plan that provides details on a business line basis and contains information on objectives, initiatives, and planned results, including links to related resource requirements over a three-year period. It also provides details on human resource requirements, major capital projects, grants and contributions, and net program costs. Introductory sections with a minister's message are followed by sections giving a departmental or organization overview; plans, results, activities, resources, and initiatives, as applicable; and financial information

  1. Assessment of the Impact of Metropolitan-Scale Urban Planning Scenarios on the Moist Thermal Environment under Global Warming: A Study of the Tokyo Metropolitan Area Using Regional Climate Modeling

    Directory of Open Access Journals (Sweden)

    Asuka Suzuki-Parker

    2015-01-01

    Full Text Available Using a high-resolution regional climate model coupled with urban canopy model, the present study provides the first attempt in quantifying the impact of metropolitan-scale urban planning scenarios on moist thermal environment under global warming. Tokyo metropolitan area is selected as a test case. Three urban planning scenarios are considered: status quo, dispersed city, and compact city. Their impact on the moist thermal environment is assessed using wet-bulb globe temperature (WBGT. Future projections for the 2070s show a 2–4°C increase in daytime mean WBGT relative to the current climate. The urban scenario impacts are shown to be small, with a −0.4 to +0.4°C range. Relative changes in temperature and humidity as the result of a given urban scenario are shown to be critical in determining the sign of the WBGT changes; however, such changes are not necessarily determined by local changes in urban land surface parameters. These findings indicate that urban land surface changes may improve or worsen the local moist thermal environment and that metropolitan-scale urban planning is inefficient in mitigating heat-related health risks for mature cities like Tokyo.

  2. WATER RESOURCES IN THE CONTEXT OF REGIONAL PLANNING. CASE STUDY: CLUJ-NAPOCA METROPOLITAN AREA

    Directory of Open Access Journals (Sweden)

    PAULA OLIVIA CIMPOIEŞ

    2012-04-01

    Full Text Available The issue of water resources is controversial because it reveals the complex needs of the population on a certain territory, depending on the analysis scale. Public utilities or water surfaces in the surrounding rural areas of a city are rarely paid much attention to in comparison to the urban centre, though they could provide comfort attributes, aesthetic value and leisure activities. Is it a matter of social fairness, political orientation or funding accessibility for a community to benefit from the water resources in the vicinity? The present study propos ed to analyse the metropolitan area of Cluj and explain why the distribution of resources varies according to physical conditions, distance or localities’ economic statute.

  3. WE-AB-201-03: TPS Commissioning and QA: Incorporating the Entire Planning Process

    International Nuclear Information System (INIS)

    Mutic, S.

    2015-01-01

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  4. WE-AB-201-00: Treatment Planning System Commissioning and QA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-06-15

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  5. WE-AB-201-01: Treatment Planning System Commissioning and QA: Challenges and Opportunities

    Energy Technology Data Exchange (ETDEWEB)

    Salomons, G. [Cancer Center of Southeastern Ontario (Canada)

    2015-06-15

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  6. WE-AB-201-03: TPS Commissioning and QA: Incorporating the Entire Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    Mutic, S. [Washington University School of Medicine (United States)

    2015-06-15

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  7. WE-AB-201-00: Treatment Planning System Commissioning and QA

    International Nuclear Information System (INIS)

    2015-01-01

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  8. WE-AB-201-01: Treatment Planning System Commissioning and QA: Challenges and Opportunities

    International Nuclear Information System (INIS)

    Salomons, G.

    2015-01-01

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  9. Review of the transportation planning process in the Kansas City metropolitan area

    Science.gov (United States)

    2013-01-01

    In 2010 the FHWA Office of Operations, Office of Transportation Management (HOTM) commissioned the development of a white paper, Data Capture and Management: Needs and Gaps in the Operation and Coordination of U.S. DOT Data Capture and Management Pro...

  10. Results of dose control and measurement plans applied for SPEAR3 commissioning year (FY04)

    Energy Technology Data Exchange (ETDEWEB)

    Khater, Hesham [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States)]. E-mail: khater1@llnl.gov; Liu, James [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Prinz, Alyssa [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Allan, Jim [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Rokni, Sayed [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States)

    2006-12-15

    Dose control and measurement plans for the SPEAR3 Booster and storage ring have taken place during the SPEAR3 commissioning. The initial commissioning period (SPEAR3 start-up) covered the time period from the beginning of November 2003 to the early part of March 2004. The period from the beginning of March to the beginning of August 2004 has been mostly dedicated to the scientific program. The initial commissioning period was characterized with frequent injection and significantly higher losses. In comparison, the scientific program period was characterized with more stable beam operation with limited number of injections per day and lower beam losses. Three types of dose measurements, passive, active and special measurements, were implemented around the SPEAR3 Booster and storage ring. Based on the expected radiation hazards, several dose control measures were adopted at several stages of the commissioning. In the early stages of commissioning, areas within 4.5 m from the walls of the Booster and storage ring were designated as radiation areas (RA). Areas outside RA were classified as radiologically controlled area (RCA). Access to these areas required less training than the RA. A monthly review of the accelerator operation conditions and radiation measurement results were used to determine the changes needed for the RA classification status and associated dose control measures.

  11. Perceptions of clients regarding family planning service delivery in a clinic of the Greater Johannesburg Metropolitan Council

    Directory of Open Access Journals (Sweden)

    A. Kellner

    2010-09-01

    Full Text Available Unwanted pregnancies with their negative impact on both women and children occur on an ongoing basis in Gauteng, South Africa. One way to prevent unwanted pregnancies is to use a reliable contraceptive method available free of charge from primary health care clinics providing family planning services throughout Gauteng Province. A literature review was completed on women and access to family planning services and an interview schedule (questionnaire was developed. The purpose of this study was to describe guidelines to meet the expectations of clients accessing family planning services provided by a clinic in Region F, Area 28 of the Greater Johannesburg metropolitan council. This quantitative, exploratory, descriptive and comparative study measured the gaps between the expectations of participants on service delivery and the extent to which these expectations were met. A convenience sample was conducted and consisted of 50 women of reproductive age (ages 15 to 49 attending the family planning clinic. Pre-testing of the instrument was conducted. Structured interviews with a interview schedule were conducted before and after women attended a family planning service. Inferential statistics indicated that there was a significant gap between the client expectations of family planning service delivery and the extent to which these expectations were met. Of the sixty-four items where women indicated the extent of their expectations the findings on only three items were not statistically significant. These gaps were addressed by proposing managerial guidelines to be implemented by the nurse manager in charge of the facility, on which this article will focus. Validity and reliability principles were ensured in the study. Ethical principles were adhered to during the research process.

  12. Study on Maintenance Personnel Development Plan For The Exported APR1400 Commissioning

    International Nuclear Information System (INIS)

    Cho, Sungbae; Kim, Jongdae; Jun, Hokwang; Hwang, Inok; Kang, Jaeyuel

    2012-01-01

    This paper indicates ways to develop maintenance personnel for the exported APR1400 commissioning. The exported APR1400 has not been experienced ay maintenance yet, and requirements for maintenance personnel have not been clarified yet. Based on sound maintenance experience, KEPCO Plant Service and Engineering Company (KEPCO KPS) has studied on maintenance training and career requirement to establish a development plan of the maintenance personnel for the exported nuclear power plant. By defining manpower and training requirement, and mobilization plan, we expect to secure reliability of the exported APR1400

  13. FMEA of manual and automated methods for commissioning a radiotherapy treatment planning system.

    Science.gov (United States)

    Wexler, Amy; Gu, Bruce; Goddu, Sreekrishna; Mutic, Maya; Yaddanapudi, Sridhar; Olsen, Lindsey; Harry, Taylor; Noel, Camille; Pawlicki, Todd; Mutic, Sasa; Cai, Bin

    2017-09-01

    To evaluate the level of risk involved in treatment planning system (TPS) commissioning using a manual test procedure, and to compare the associated process-based risk to that of an automated commissioning process (ACP) by performing an in-depth failure modes and effects analysis (FMEA). The authors collaborated to determine the potential failure modes of the TPS commissioning process using (a) approaches involving manual data measurement, modeling, and validation tests and (b) an automated process utilizing application programming interface (API) scripting, preloaded, and premodeled standard radiation beam data, digital heterogeneous phantom, and an automated commissioning test suite (ACTS). The severity (S), occurrence (O), and detectability (D) were scored for each failure mode and the risk priority numbers (RPN) were derived based on TG-100 scale. Failure modes were then analyzed and ranked based on RPN. The total number of failure modes, RPN scores and the top 10 failure modes with highest risk were described and cross-compared between the two approaches. RPN reduction analysis is also presented and used as another quantifiable metric to evaluate the proposed approach. The FMEA of a MTP resulted in 47 failure modes with an RPN ave of 161 and S ave of 6.7. The highest risk process of "Measurement Equipment Selection" resulted in an RPN max of 640. The FMEA of an ACP resulted in 36 failure modes with an RPN ave of 73 and S ave of 6.7. The highest risk process of "EPID Calibration" resulted in an RPN max of 576. An FMEA of treatment planning commissioning tests using automation and standardization via API scripting, preloaded, and pre-modeled standard beam data, and digital phantoms suggests that errors and risks may be reduced through the use of an ACP. © 2017 American Association of Physicists in Medicine.

  14. North Dakota Metropolitan Planning Organization's peer exchange on introducing performance management into the MPO planning process : A TPCB Exchange

    Science.gov (United States)

    1997-02-01

    This technical memorandum was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national progr...

  15. IMRT commissioning: Multiple institution planning and dosimetry comparisons, a report from AAPM Task Group 119

    Energy Technology Data Exchange (ETDEWEB)

    Ezzell, Gary A.; Burmeister, Jay W.; Dogan, Nesrin [Department of Radiation Oncology, Mayo Clinic Scottsdale, 5777 East Mayo Boulevard, MCSB Concourse, Phoenix, Arizona 89054 (United States); and others

    2009-11-15

    AAPM Task Group 119 has produced quantitative confidence limits as baseline expectation values for IMRT commissioning. A set of test cases was developed to assess the overall accuracy of planning and delivery of IMRT treatments. Each test uses contours of targets and avoidance structures drawn within rectangular phantoms. These tests were planned, delivered, measured, and analyzed by nine facilities using a variety of IMRT planning and delivery systems. Each facility had passed the Radiological Physics Center credentialing tests for IMRT. The agreement between the planned and measured doses was determined using ion chamber dosimetry in high and low dose regions, film dosimetry on coronal planes in the phantom with all fields delivered, and planar dosimetry for each field measured perpendicular to the central axis. The planar dose distributions were assessed using gamma criteria of 3%/3 mm. The mean values and standard deviations were used to develop confidence limits for the test results using the concept confidence limit=|mean|+1.96{sigma}. Other facilities can use the test protocol and results as a basis for comparison to this group. Locally derived confidence limits that substantially exceed these baseline values may indicate the need for improved IMRT commissioning.

  16. Dosimetric and QA aspects of Konrad inverse planning system for commissioning intensity-modulated radiation therapy

    Directory of Open Access Journals (Sweden)

    Deshpande Shrikant

    2007-01-01

    Full Text Available The intensity-modulated radiation therapy (IMRT planning is performed using the Konrad inverse treatment planning system and the delivery of the treatment by using Siemens Oncor Impression Plus linear accelerator (step and shoot, which has been commissioned recently. The basic beam data required for commissioning the system were generate. The quality assurance of relative and absolute dose distribution was carried out before clinical implementation. The salient features of Konrad planning system, like dependence of grid size on dose volume histogram (DVH, number of intensity levels and step size in sequencer, are studied quantitatively and qualitatively. To verify whether the planned dose [from treatment planning system (TPS] and delivered dose are the same, the absolute dose at a point is determined using CC01 ion chamber and the axial plane dose distribution is carried out using Kodak EDR2 in conjunction with OmniPro IMRT Phantom and OmniPro IMRT software from Scanditronix Wellhofer. To obtain the optimum combination in leaf sequencer module, parameters like number of intensity levels, step size are analyzed. The difference between pixel values of optimum fluence profile and the fluence profile obtained for various combinations of number of intensity levels and step size is compared and plotted. The calculations of the volume of any RT structure in the dose volume histogram are compared using grid sizes 3 mm and 4 mm. The measured and planned dose at a point showed good agreement (< 3% except for a few cases wherein the chamber was placed in a relatively high dose gradient region. The axial plane dose distribution using film dosimetry shows excellent agreement (correlation coefficient> 0.97 in all the cases. In the leaf sequencer module, the combination of number of intensity level 7 with step size of 3 is the optimal solution for obtaining deliverable segments. The RT structure volume calculation is found to be more accurate with grid size of

  17. Commissioning and quality control of a dedicated wide bore 3T MRI simulator for radiotherapy planning

    Directory of Open Access Journals (Sweden)

    Aitang Xing

    2016-06-01

    Full Text Available Purpose: The purpose of this paper is to describe a practical approach to commissioning and quality assurance (QA of a dedicated wide-bore 3 Tesla (3T magnetic resonance imaging (MRI scanner for radiotherapy planning.Methods: A comprehensive commissioning protocol focusing on radiotherapy (RT specific requirements was developed and performed. RT specific tests included: uniformity characteristics of radio-frequency (RF coil, couch top attenuation, geometric distortion, laser and couch movement and an end-to-end radiotherapy treatment planning test. General tests for overall system performance and safety measurements were also performed.Results: The use of pre-scan based intensity correction increased the uniformity from 61.7% to 97% (body flexible coil, from 50% to 90% (large flexible coil and from 51% to 98% (small flexible coil. RT flat top couch decreased signal-to-noise ratio (SNR by an average of 42%. The mean and maximum geometric distortion was found to be 1.25 mm and 4.08 mm for three dimensional (3D corrected image acquisition, 2.07 mm and 7.88 mm for two dimensional (2D corrected image acquisition over 500 mm × 375 mm × 252 mm field of view (FOV. The accuracy of the laser and couch movement was less than ±1 mm. The standard deviation of registration parameters for the end-to-end test was less than 0.41 mm. An on-going QA program was developed to monitor the system’s performance.Conclusion: A number of RT specific tests have been described for commissioning and subsequent performance monitoring of a dedicated MRI simulator (MRI-Sim. These tests have been important in establishing and maintaining its operation for RT planning.

  18. Setting Priorities for Urban Forest Planning. A Comprehensive Response to Ecological and Social Needs for the Metropolitan Area of Rome (Italy

    Directory of Open Access Journals (Sweden)

    Giulia Capotorti

    2015-04-01

    Full Text Available Urban forests represent key elements of green infrastructure and provide essential ecosystem services in both the ecological and social spheres. Therefore, forestation planning plays a decisive role in the sustainable development strategies of metropolitan areas and addresses the challenge of maintaining biodiversity while improving human health and well-being. The aim of this work is to present a methodological approach that can be used to identify priorities in urban forest planning and can provide comprehensive responses to ecological and social needs in any metropolitan context. The approach, which is based on interdisciplinary principles of landscape ecology, ecosystem geography and dynamic plant sociology, has been adopted in the Municipality of Rome (Italy. The first step entails defining an ecological framework for forestation plans by means of the ecological land classification and assessment of landscape conservation status. The second step entails setting forestation priorities according to both ecological and social criteria. The application of the method proved to effectively select limited areas requiring intervention within an extensive metropolitan area. Furthermore, it provided responses to sustainability issues such as long-term maintenance of restored habitats, landscape perspective of planning, greening of urban agriculture, improvement in urban resilience, and cost-effective improvement in ecosystem services provision.

  19. Co-benefit analysis of an air quality management plan and greenhouse gas reduction strategies in the Seoul metropolitan area

    International Nuclear Information System (INIS)

    Chae, Yeora

    2010-01-01

    This study assesses the co-benefits of an air quality management plan and CO 2 emission control measures in the Seoul metropolitan area. This co-benefit analysis includes NO x , PM 10 and CO 2 emission reductions and cost estimations, yielding cost-effectiveness values for each of the measures. It has been found that fuel switching from BC-oil to LNG, CNG bus operation are most cost effective in NO x and PM 10 emission reduction. For CO 2 emission reduction, landfill gas reuse and fuel switching were the most effective option. The correlation of cost-effectiveness analysis indicated that fuel switching and CNG bus operation were the most cost effective option to reduce NO x and CO 2 , PM 10 and CO 2 emissions at the same time. Based on cost effectiveness and co-benefit analysis, this study developed an alternative scenario of emission reduction measures through optimization in order to achieve both air quality improvements and CO 2 reduction targets at the minimum cost. These integrated environmental strategies make it possible to reduce 10.3 Mt of CO 2 emissions, which is beyond the target of the CO 2 reduction strategy, and achieve air quality improvement targets together and at a lower cost than the CO 2 emission reduction and air quality improvement measures combined.

  20. Woking Park PAFC CHP monitoring. Phase 1: Planning, installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Goulding, P S; Fry, M R

    2003-07-01

    This report covers the planning, installation and commissioning of the first commercially operated fuel cell cogeneration system in the UK. The involvement of Woking Borough Council, its approach to energy efficiency, and the Woking Park site are discussed, and details are given of the PC25/C 200kW fuel cell which is manufactured in the US by UTC Fuel Cells. A description of the Woking Park fuel cell combined heat and power application is presented, and the project economics, specification and tendering are examined. The route taken to planning approval is traced, and installation procedures are outlined. The testing of the phosphoric type PC25 fuel cell cogeneration unit is described, and expected cost and project timescales are noted.

  1. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    International Nuclear Information System (INIS)

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle's Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC)

  2. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    Energy Technology Data Exchange (ETDEWEB)

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle`s Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC).

  3. Heavy Precipitation impacts and emergency planning - developing applicable strategies for a metropolitan area

    Science.gov (United States)

    Kutschker, Thomas; Glade, Thomas

    2016-04-01

    area. It shows that most of the damage is caused by spilled sewage drains flooding basements and streets. Besides less fire brigade operations are observed in rural areas with constant amount of rainfall. The occurrence of heavy rain events is spatially limited, hot-spot areas with higher probability can be detected. Based on this finding, a resource management strategy for the fire brigade can be developed. Keywords: emergency planning strategy, critical infrastructure, heavy rainfall, fire-brigade resource management

  4. Characterization of the diamond detector for commissioning the Eclipse Planning System

    International Nuclear Information System (INIS)

    Pavan, Guilherme A.; Cardoso, Domingos de O.; Fontes, Gladson S.; Instituto Militar de Engenharia

    2017-01-01

    Diamond detectors are an option in the commissioning of linear accelerators, especially in small field measurements due to characteristics such as: small sensitive volume (0.004mm 3 ) and low energy dependence, desirable attributes for PDP measurements, output factors and profiles. The purpose of this study was to characterize PTW microDiamond 60019 diamond detector in relation to linearity, dependencies: energy, directional and with dose rate; Besides comparing measurements of PDP, output factors and profiles with some ionization and diode chambers. We also analyzed two models of the Eclipse planning system, performed with data from the commissioning of a TrueBeam accelerator obtained with the CC13 camera and with the diamond. Linearity deviations less than 0.5% were obtained in the range of 50cGy to 20Gy for energies of 6,10 and 15MV. Variations smaller than 0.5% for energy dependence and dose rate and angular dependence less than 0.5% in the axial and polar directions were observed. In the small-field output factors the diamond presented higher relative readings to the chambers: CC13, PintPoint3D and CC01 and similar to the diode. In the PDP it showed superiority in the definition of the buildup and surface regions. In the small field profiles it was shown a better definition of the penumbra in relation to the ionization chambers and in relation to the diode was equivalent, being superior in the tail region of large fields. In both models of Eclipse there were no significant differences for 1%3mm gamma analysis for PDP and profiles, although the diamond presented smaller mean gamma errors. The Collimator Backscatter Factors (CBSF) analysis for the two sets of measures showed differences mainly for small fields. The results of this study indicate that the diamond detector is one of the most versatile on the market in different commissioning situations, especially for small field measurements. (author)

  5. GeMS: Gemini Mcao System: current status and commissioning plans

    Science.gov (United States)

    Boccas, Maxime; Rigaut, François; Gratadour, Damien; d'Orgeville, Céline; Bec, Matthieu; Daruich, Felipe; Perez, Gabriel; Arriagada, Gustavo; Bombino, Stacy; Carter, Chris; Cavedoni, Chas; Collao, Fabian; Collins, Paul; Diaz, Pablo; Ebbers, Angelic; Galvez, Ramon; Gausachs, Gaston; Hardash, Steve; James, Eric; Karewicz, Stan; Lazo, Manuel; Maltes, Diego; Mouser, Ron; Rogers, Rolando; Rojas, Roberto; Sheehan, Michael; Trancho, Gelys; Vergara, Vicente; Vucina, Tomislav

    2008-07-01

    The Gemini Multi-Conjugate Adaptive Optics project was launched in April 1999 to become the Gemini South AO facility in Chile. The system includes 5 laser guide stars, 3 natural guide stars and 3 deformable mirrors optically conjugated at 0, 4.5 and 9km to achieve near-uniform atmospheric compensation over a 1 arc minute square field of view. Sub-contracted systems with vendors were started as early as October 2001 and were all delivered by July 2007, but for the 50W laser (due around September 2008). The in-house development began in January 2006, and is expected to be completed by the end of 2008 to continue with integration and testing (I&T) on the telescope. The on-sky commissioning phase is scheduled to start during the first half of 2009. In this general overview, we will first describe the status of each subsystem with their major requirements, risk areas and achieved performance. Next we will present our plan to complete the project by reviewing the remaining steps through I&T and commissioning on the telescope, both during day-time and at night-time. Finally, we will summarize some management activities like schedules, resources and conclude with some lessons learned.

  6. The response of the Government of Ontario to the final report of the Royal Commission on Electric Power Planning

    International Nuclear Information System (INIS)

    1981-05-01

    In March 1980, after nearly five years of hearings and research, the Ontario Royal Commission on Electric Power Planning submitted the first volume of its final report. The remaining eight volumes were submitted in April 1980. The Commission made 88 recommendations on technical, operational, and policy issues. The present document sets out the Ontario government's response to the recommendations. The government accepts and is implementing 77 recommendations. Four recommendations require further study, and six have been rejected

  7. Commissioning and quality assurance of computerized planning systems for radiation treatment of cancer

    International Nuclear Information System (INIS)

    2004-01-01

    Cancer is a significant health care problem; on average about half of all cancer patients are treated with radiation therapy worldwide. This mode of treatment uses complex technology that involves megavoltage radiation that, if not handled with the greatest of care, could lead to significant patient treatment errors and exposures of staff. Recent years have seen a rapid development in the technology of radiation oncology. One of the prime factors contributing to this rapid development has been the evolution of computer technology and its applications in: (a) patient diagnosis using sophisticated computerized diagnostic imaging equipment; (b) the process of radiation treatment planning using computerized radiation treatment planning systems (TPSs) that are capable of using data from diagnostic imagers; and (c) radiation dose delivery using relatively simple 60 Co machines or complex linear accelerators with computer controlled delivery systems including multileaf collimators (MLCs) for field shaping, possibly in a dynamic mode while the beam is on. The radiation treatment process involves the application of some or all of these technologies to provide the desired dose to the target volume while minimizing exposure to adjacent normal tissues. While dose computational equipment was available as early as 1951, more generalized treatment planning calculations evolved, including under the sponsorship of the IAEA, in the 1960s that made use of time sharing systems to develop atlases of isodose distributions for general use. In the 1970s and 1980s treatment planning computers became more specialized and readily available to individual radiation therapy centres. As computer technology evolved and became more compact so did TPSs, while at the same time dose calculation algorithms and image display capabilities became more sophisticated. While there is a substantial variation in capabilities, today's treatment planning computers have become readily available to virtually all

  8. Commissioning MMS

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  9. Efficient Metropolitan Resource Allocation

    Directory of Open Access Journals (Sweden)

    Richard Arnott

    2016-05-01

    Full Text Available Over the past 30 years Calgary has doubled in size, from a population of 640,645 in 1985 to 1,230,915 in 2015. During that time the City has had five different mayors, hosted the Winter Olympics, and expanded the C-Train from 25 platforms to 45. Calgary’s Metropolitan Area has grown too, with Airdrie, Chestermere, Okotoks and Cochrane growing into full-fledged cities, ripe with inter-urban commuters.* And with changes to provincial legislation in the mid-’90s, rural Rocky View County and the Municipal District of Foothills are now real competitors for residential, commercial and industrial development that in the past would have been considered urban. In this metropolitan system, where people live, their household structure, and their place of work informs the services they need to conduct their daily lives, and directly impacts the spatial character of the City and the broader region. In sum, Metropolitan Calgary is increasingly complex. Calgary and the broader metropolitan area will continue to grow, even with the current economic slowdown. Frictions within Calgary, between the various municipalities in the metropolitan area, and the priorities of other local authorities (such as the School Boards and Alberta Health Services will continue to impact the agendas of local politicians and their ability to answer to the needs of their residents. How resources – whether it is hard infrastructure, affordable housing, classrooms, or hospital beds – are allocated over space and how these resources are funded, directly impacts these relationships. This technical paper provides my perspective as an urban economist on the efficient allocation of resources within a metropolitan system in general, with reference to Calgary where appropriate, and serves as a companion to the previously released “Reflections on Calgary’s Spatial Structure: An Urban Economists Critique of Municipal Planning in Calgary.” It is hoped that the concepts reviewed

  10. Nursing Education in Florida. Report 5. Report and Recommendations of the Postsecondary Education Planning Commission, 1988.

    Science.gov (United States)

    Florida State Postsecondary Education Planning Commission, Tallahassee.

    As directed by the Florida State Legislature, the Postsecondary Education Commission examined Florida's needs in the area of nursing education. Following the executive summary, the introduction reviews the commission charge and activities. Major topics addressed include: the nursing profession (introduction, history, licensure, careers, and…

  11. Regional health workforce planning through action research: lessons for commissioning health services from a case study in Far North Queensland.

    Science.gov (United States)

    Panzera, Annette June; Murray, Richard; Stewart, Ruth; Mills, Jane; Beaton, Neil; Larkins, Sarah

    2016-01-01

    Creating a stable and sustainable health workforce in regional, rural and remote Australia has long been a challenge to health workforce planners, policy makers and researchers alike. Traditional health workforce planning is often reactive and assumes continuation of current patterns of healthcare utilisation. This demonstration project in Far North Queensland exemplifies how participatory regional health workforce planning processes can accurately model current and projected local workforce requirements. The recent establishment of Primary Health Networks (PHNs) with the intent to commission health services tailored to individual healthcare needs underlines the relevance of such an approach. This study used action research methodology informed by World Health Organization (WHO) systems thinking. Four cyclical stages of health workforce planning were followed: needs assessment; health service model redesign; skills-set assessment and workforce redesign; and development of a workforce and training plan. This study demonstrated that needs-based loco-regional health workforce planning can be achieved successfully through participatory processes with stakeholders. Stronger health systems and workforce training solutions were delivered by facilitating linkages and planning processes based on community need involving healthcare professionals across all disciplines and sectors. By focusing upon extending competencies and skills sets, local health professionals form a stable and sustainable local workforce. Concrete examples of initiatives generated from this process include developing a chronic disease inter-professional teaching clinic in a rural town and renal dialysis being delivered locally to an Aboriginal community. The growing trend of policy makers decentralising health funding, planning and accountability and rising health system costs increase the future utility of this approach. This type of planning can also assist the new PHNs to commission health services

  12. Current Status, Planning and Prospects of the 1202 State Postsecondary Commissions.

    Science.gov (United States)

    Fenske, Robert H., Ed.; Romesburg, Kerry D., Ed.

    With the passage of the Education Amendments of 1972, the Congress of the United States introduced to the nation's educators a new academic and educational environment. Included in those amendments, under Title XII, General Provisions, was Section 1202 pertaining to the establishment of state postsecondary education commissions, signifying an…

  13. Energy-Independent Architectural Models for Residential Complex Plans through Solar Energy in Daegu Metropolitan City, South Korea

    Directory of Open Access Journals (Sweden)

    Sung-Yul Kim

    2018-02-01

    Full Text Available This study suggests energy-independent architectural models for residential complexes through the production of solar-energy-based renewable energy. Daegu Metropolitan City, South Korea, was selected as the target area for the residential complex. An optimal location in the area was selected to maximize the production of solar-energy-based renewable energy. Then, several architectural design models were developed. Next, after analyzing the energy-use patterns of each design model, economic analyses were conducted considering the profits generated from renewable-energy use. In this way, the optimum residential building model was identified. For this site, optimal solar power generation efficiency was obtained when solar panels were installed at 25° angles. Thus, the sloped roof angles were set to 25°, and the average height of the internal space of the highest floor was set to 1.8 m. Based on this model, analyses were performed regarding energy self-sufficiency improvement and economics. It was verified that connecting solar power generation capacity from a zero-energy perspective considering the consumer’s amount of power consumption was more effective than connecting maximum solar power generation capacity according to building structure. Moreover, it was verified that selecting a subsidizable solar power generation capacity according to the residential solar power facility connection can maximize operational benefits.

  14. Off-line commissioning of EBIS and plans for its integration into ATLAS and CARIBU

    Energy Technology Data Exchange (ETDEWEB)

    Ostroumov, P. N., E-mail: ostroumov@anl.gov; Barcikowski, A.; Dickerson, C. A.; Mustapha, B.; Perry, A.; Sharamentov, S. I.; Vondrasek, R. C.; Zinkann, G. [Argonne National Laboratory, Argonne, Illinois 60439 (United States)

    2016-02-15

    An Electron Beam Ion Source Charge Breeder (EBIS-CB) has been developed at Argonne to breed radioactive beams from the CAlifornium Rare Isotope Breeder Upgrade (CARIBU) facility at Argonne Tandem Linac Accelerator System (ATLAS). The EBIS-CB will replace the existing ECR charge breeder to increase the intensity and significantly improve the purity of reaccelerated radioactive ion beams. The CARIBU EBIS-CB has been successfully commissioned offline with an external singly charged cesium ion source. The performance of the EBIS fully meets the specifications to breed rare isotope beams delivered from CARIBU. The EBIS is being relocated and integrated into ATLAS and CARIBU. A long electrostatic beam transport system including two 180° bends in the vertical plane has been designed. The commissioning of the EBIS and the beam transport system in their permanent location will start at the end of this year.

  15. Off-line commissioning of EBIS and plans for its integration into ATLAS and CARIBU

    Science.gov (United States)

    Ostroumov, P. N.; Barcikowski, A.; Dickerson, C. A.; Mustapha, B.; Perry, A.; Sharamentov, S. I.; Vondrasek, R. C.; Zinkann, G.

    2016-02-01

    An Electron Beam Ion Source Charge Breeder (EBIS-CB) has been developed at Argonne to breed radioactive beams from the CAlifornium Rare Isotope Breeder Upgrade (CARIBU) facility at Argonne Tandem Linac Accelerator System (ATLAS). The EBIS-CB will replace the existing ECR charge breeder to increase the intensity and significantly improve the purity of reaccelerated radioactive ion beams. The CARIBU EBIS-CB has been successfully commissioned offline with an external singly charged cesium ion source. The performance of the EBIS fully meets the specifications to breed rare isotope beams delivered from CARIBU. The EBIS is being relocated and integrated into ATLAS and CARIBU. A long electrostatic beam transport system including two 180° bends in the vertical plane has been designed. The commissioning of the EBIS and the beam transport system in their permanent location will start at the end of this year.

  16. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project.

    Science.gov (United States)

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D'Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-06-02

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  17. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project

    Directory of Open Access Journals (Sweden)

    Christos Antonopoulos

    2016-06-01

    Full Text Available In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes, and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  18. A model for environmental scanning oriented for the strategic planning of the Brazilian Nuclear Energy Commission (CNEN)

    International Nuclear Information System (INIS)

    Braga, Fabiane dos Reis

    1997-01-01

    Presently, all the organizations involved with nuclear activities must be one step ahead of what happens in the specific activity areas in order to avoid surprises, to guarantee their activity continuity and the objective extents, and taking into account the external environment influence exercised by the organization on their activities. So, it is necessary a continuous follow up of their transformations. This paper aims to structure a model of the environmental monitoring system oriented to the strategic planning of the Brazilian Nuclear Energy Commission, as function of that new informational needs viewing the fulfilment of that observed gap. (author)

  19. A protocol for the commissioning and quality assurance of new planning computers

    International Nuclear Information System (INIS)

    Ratcliffe, A.J.; Aukett, R.J.; Bolton, S.C.; Bonnett, D.E.

    1995-01-01

    Any new radiotherapy planning system needs to be thoroughly tested. Besides checking the accuracy of the algorithm by comparing plans done on the system with measurements done in a phantom, it is desirable for the user to compare the new equipment with a tried and tested system before it is used clinically. To test our recently purchased planning systems, a protocol was developed for running a comparison between these and our existing planning computer, an IGE RTPLAN. A summary of the test protocol that was developed is as follows: (1) A series of plans is created on the old system, to include at least one plan of each common type. The series includes at least one plan with a bone inhomogeneity, and one with an air or lung inhomogeneity, and these plans are computed both with and without inhomogeneity correction. Point dose calculations are made for a number of positions on each plan, including the dose at the centre of the treatment volume. (2) Each of these plans is reproduced as accurately as possible on the new system using the original CT data and patient outlines. (3) The old and new plans, including those with and without inhomogeneity correction are overlaid and compared using the following criteria: (a) how well the volumes of interest coincide, (b) how accurately the positions of the points of interest are reproduced, (c) the doses at the points of interest, (d) the distances between the isodoses defining the dose plateau, (e) the maximum displacement between the corresponding pairs of isodoses in the dose gradient around the tumour. The protocol has been used to test two systems: the (newly developed) Siemens Axiom and the Helax TMS (running on a DEC Alpha). A summary of the results obtained will be presented. These were sufficient to show up several minor problems, particularly in the Axiom system

  20. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

  1. Report made on behalf of the Sustainable Development and Land Planning Commission on the private bill introducing an ecological planning (n. 1991)

    International Nuclear Information System (INIS)

    2009-11-01

    This report of the French National Assembly first outlines and comments the need for a commitment to preserve the planet, which encompasses the struggle against climate change within the frame of the several existing international agreements. The author then stresses the fact that the French commitments must be met, and that the French national policy must be a model in order France to have a bigger weight in international conferences, particularly in the field of greenhouse gas emission reduction. Then, after having recalled the historical background of planning practices in France, and described the various planning instruments ('contrats de Plan Etat-Regions') and institutions (DIACT, previously named DATAR), the author presents an example of ecological land planning: the 'Schema Directeur 2008 de la Region Ile-de-France' (Ile-de-France regional guiding plan for 2008), which defines the future of the Ile-de-France region by 2030 in terms of space planning as well as in terms of social, economical and environmental evolutions. The report then discusses the various aspects of an ecological planning: an environment-friendly energy, an efficient housing policy which is in relationship with transport networks, an economy taking the ecological factor into account. A transcription of the debate of the Commission is given

  2. Commission's climate plan aims to nudge EU towards Kyoto target

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-11-01

    The European Commission has outlined a range of new measures to reduce the EU's emissions of greenhouse gases from energy production, industry, transport and the domestic sector. These include: requirements for industrial installations to prevent pollution and to use energy efficiently; a proposed directive to restrict the use of fluorinated gases; a directive for minimum efficiency of equipment; a directive to set targets to promote and support the management of energy demand; and a proposed CHP directive. A draft decision was issued last October to set legally binding greenhouse gas reduction targets. An analysis suggests that most countries are way off course. 1 fig.

  3. Independent Planning System and Public Administration in Metropolitan Development: Agglomeration Strategies of Greater Chaoshan in Southern China

    Directory of Open Access Journals (Sweden)

    Tian Guang

    2017-04-01

    Full Text Available This paper examines independent planning system as a means of public administration in regional economic development. It proposes a new strategy based on the theories of public administrative resources, to agglomerate and unify the cities of Shantou, Jieyang, and Chaozhou into a new administrative entity as a metropolis with the status of independent planning and the preferred policies of a Special Economic Region to lead regional development. The optimal allocation of public administrative resources has played a key role in the fundamental economic development in China in recent years. The new administrative system of large cities (metropolises with independent planning has become an innovative format to utilize the renewable soft resources of administration, which in fact is a new attempt to reform the economic system by the Chinese government. The greater Chaoshan area needs to be agglomerated and unified to further develop the regional economy with the implementation of independent planning system. The current research conducted from a practical and political point of view is of significant value to the overall planning and strategic layout of the economic and social development of the whole eastern Guangdong region.

  4. Commissioning and Validation of the First Monte Carlo Based Dose Calculation Algorithm Commercial Treatment Planning System in Mexico

    International Nuclear Information System (INIS)

    Larraga-Gutierrez, J. M.; Garcia-Garduno, O. A.; Hernandez-Bojorquez, M.; Galvan de la Cruz, O. O.; Ballesteros-Zebadua, P.

    2010-01-01

    This work presents the beam data commissioning and dose calculation validation of the first Monte Carlo (MC) based treatment planning system (TPS) installed in Mexico. According to the manufacturer specifications, the beam data commissioning needed for this model includes: several in-air and water profiles, depth dose curves, head-scatter factors and output factors (6x6, 12x12, 18x18, 24x24, 42x42, 60x60, 80x80 and 100x100 mm 2 ). Radiographic and radiochromic films, diode and ionization chambers were used for data acquisition. MC dose calculations in a water phantom were used to validate the MC simulations using comparisons with measured data. Gamma index criteria 2%/2 mm were used to evaluate the accuracy of MC calculations. MC calculated data show an excellent agreement for field sizes from 18x18 to 100x100 mm 2 . Gamma analysis shows that in average, 95% and 100% of the data passes the gamma index criteria for these fields, respectively. For smaller fields (12x12 and 6x6 mm 2 ) only 92% of the data meet the criteria. Total scatter factors show a good agreement ( 2 ) that show a error of 4.7%. MC dose calculations are accurate and precise for clinical treatment planning up to a field size of 18x18 mm 2 . Special care must be taken for smaller fields.

  5. Mapping recreation and aesthetic values of ecosystem services in the Bilbao Metropolitan Greenbelt (northern Spain) to support landscape planning

    NARCIS (Netherlands)

    Casado-Arzuaga, I.; Onaindia, M.; Madriaga, I.; Verburg, P.H.

    2014-01-01

    This paper presents a method to quantify cultural ecosystem services (ES) and their spatial distribution in the landscape based on ecological structure and social evaluation approaches. The method aims to provide quantified assessments of ES to support land use planning decisions. A GIS-based

  6. The Driving Forces for the Practice of Strategic Planning in SMEs: Evidence from Harare Metropolitan Province, Zimbabwe

    Directory of Open Access Journals (Sweden)

    Maxwell Sandada

    2016-08-01

    Full Text Available Despite Zimbabwe sharing with the rest of the world, the notion that SMEs are the impeccable engines to economic revival, growth and development, many of the nation`s SMEs are plagued with high failure rates. Previous studies carried out in most foreign countries suggested that the high failure rate of SMEs was attributable to lack of strategic planning among a host of other factors. Against this backdrop, the purpose of this study was to examine the driving forces for the practice of strategic planning in SMEs. A quantitative cross sectional study was conducted among active SMEs who are registered with the Ministry of Small and Medium Enterprises and Cooperative Development in Zimbabwe. The study revealed that globalisation, business ownership motivations, environmental dynamism and innovation & technological advancement have a positive and statistically significant influence on the adoption or practice of strategic planning among SMEs. The study has important implications for the practice and implementation of strategic planning among SMEs especially in the context of a developing country such as Zimbabwe.

  7. The Driving Forces for the Practice of Strategic Planning in SMEs: Evidence from Harare Metropolitan Province, Zimbabwe

    OpenAIRE

    Maxwell Sandada; Raynold Tinomudaishe Chikwama

    2016-01-01

    Despite Zimbabwe sharing with the rest of the world, the notion that SMEs are the impeccable engines to economic revival, growth and development, many of the nation`s SMEs are plagued with high failure rates. Previous studies carried out in most foreign countries suggested that the high failure rate of SMEs was attributable to lack of strategic planning among a host of other factors. Against this backdrop, the purpose of this study was to examine the driving forces for the practic...

  8. 76 FR 35426 - Denali Commission Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2011-06-17

    ... developing access to construction trades through the enhancement of construction career pathways and the... providing an opportunity for a 30- day period of public review and written comment. During this time, the... Technology Program $2,400,000 Bulk Fuel/RPSU Planning, Design & $3,770,350 Construction. Renewable Energy...

  9. Special Education Program Evaluation: A Planning Guide. An Overview. CASE Commissioned Series.

    Science.gov (United States)

    McLaughlin, John A.

    This resource guide is intended to help in planning special education program evaluations. It focuses on: basic evaluation concepts, identification of special education decision makers and their information needs, specific evaluation questions, procedures for gathering relevant information, and evaluation of the evaluation process itself.…

  10. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  11. The International Commission on Radiation Units and Measurement (ICRU): activities and future plans

    International Nuclear Information System (INIS)

    Wambersie, A.; DeLuca, P.M.; Caswell, R.S.; Menzel, H.G.

    2000-01-01

    The main objective of the ICRU is to develop a universally accepted set of quantities and units for the different applications of radiations in medicine, protection, research and industry. Absorbed dose was introduced by the ICRU in 1953 as the fundamental quantity correlated to the biological effect. This quantity (with its special unit gray, initially rad) is found to be most useful for the majority of applications and is university accepted. However some limitations in the concept of absorbed dose have been recently identified, in particular when the conditions for the 'averaging procedure' implied in the concept are no longer met. This issue is now studied very carefully by the ICRU. In 1962, the ICRU introduced the quantity dose equivalent for radiation protection purposes (with its special unit sievert, initially rem). In 1985, it developed operational quantities for the specification of dose equivalent for area monitoring in the case of external radiation sources. Besides its efforts in the development of concepts and quantities, the ICRU has always played an important role in providing guidance for measurements in the field of radiation protection. Increased focus on guidance for specific measurement procedures and techniques will further harmonize the approaches and improve the reliability of results. Contribution of the ICRU in radiation protection was achieved in collaboration with the ICRP. As an example, Report on 'Conversion coefficients for use in radiological protection against external radiation' is the result of such collaboration and has been published in the report series of both Commissions (1997, 1998). (author)

  12. Biological water-quality assessment of selected streams in the Milwaukee Metropolitan Sewerage District Planning Area of Wisconsin, 2007

    Science.gov (United States)

    Scudder Eikenberry, Barbara C.; Bell, Amanda H.; Sullivan, Daniel J.; Lutz, Michelle A.; Alvarez, David A.

    2010-01-01

    Changes in the water quality of stream ecosystems in an urban area may manifest in conspicuous ways, such as in murky or smelly streamwater, or in less conspicuous ways, such as fewer native or pollution-sensitive organisms. In 2004, and again in 2007, the U.S. Geological Survey sampled stream organisms—algae, invertebrates, and fish—in 14 Milwaukee area streams to assess water quality as part of the ongoing Milwaukee Metropolitan Sewerage District (MMSD) Corridor Study. In addition, passive-sampling devices (SPMDs, “semipermeable membrane devices”) were deployed at a subset of sites in order to evaluate the potential exposure of stream organisms to certain toxic chemicals. Results of the 2007 sampling effort are the focus of this report. Results of sampling from 2007 are compared with results from 2004. The water quality of sampled streams was assessed by evaluating biological-assemblage data, metrics computed from assemblage data, and an aggregate bioassessment ranking method that combined data for algae, invertebrates, and fish. These data contain information about the abundance (number) of different species in each group of stream organisms and the balance between species that can or cannot tolerate polluted or disturbed conditions. In 2007, the highest numbers of algal, invertebrate, and fish species were found at the Milwaukee River at Milwaukee, the largest sampled site. Algal results indicated water quality concerns at 10 of the 14 sampled sites due to the occurrence of nuisance algae or low percentages of pollution-sensitive algae. When compared to 2004, total algal biovolume was higher in 2007 at 12 of 14 sites, due mostly to more nuisance green algae from unknown causes. Results of several metrics, including the Hilsenhoff Biotic Index (HBI-10), suggest that invertebrate assemblages in the Little Menomonee River, Underwood Creek, and Honey Creek were poorer quality in 2007 compared to 2004. Six sites received “very poor” quality ratings for

  13. Urban form at the fringe of Metropolitan Santiago. A result of a normative or profitability plan?. / La forma urbana en la periferia del área metropolitana de Santiago. ¿La consecuencia de una normativa o plan de rentabilidad?

    Directory of Open Access Journals (Sweden)

    Mawromatis, Constantino

    1999-12-01

    Full Text Available Metropolitan Santiago is one of the many Latin American cities which has been developed according to a spread model of urbanisation. This pattern has caused at least two types of consequences: economic and physical ones. The former is shown in the speculation of land value at the rural fringe of the metropolitan area which has low prices, these have suddenly increased after the normative changes in the land use, from rural to urban. The later shows location of massive low-income housing and commercial malls regardless connection to the urban fabric and spatial shaping of the existing city. This results in a chaotic urban form resembling a "patchwork".This paper reviews the scope of a Chilean policy instrument called "Plan Regulador" used to control physical urban growth, particularly sprawled on the fringe of the city. It is believed that as a consequence of this Plan, normative procedures are not good enough for achieving its objectives. Conversely, urban form appears to be a result of a profitability plan made by private developers. Given the weakness of this instrument, some recommendations related to spatial models are suggested to incorporate to or complement the "Plan Regulador"./ El Plan Regulador Comunal es el instrumento normativo de planeación urbanística chilena, cuya formulación pretende regular en el ámbito comunal básicamente los siguientes aspectos: los usos de suelo, las condiciones de edificación y subdivisión del suelo, la red vial estructurante y los limites urbanos.Se cree que este instrumento es imperfecto toda vez que no incorpora en la normativa una dimensión clave del urbanismo: la morfología urbana, entendida como el sistema espacial tridimensional de la ciudad. Por el contrario, el análisis empírico demuestra que factores como la forma urbana son respuestas del libre juego de fuerzas económicas y sociales modeladoras del espacio. En consecuencia, lo que domina es un patrón de urbanización en vez de un

  14. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    International Nuclear Information System (INIS)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission's (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency's strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended

  15. Activities and future plans of the international commission on non-ionizing radiation protection (ICNIRP)

    International Nuclear Information System (INIS)

    Bernhardt, J.H.

    2000-01-01

    , on Risk perception and communication and on EMF impact on the Environment have been jointly organised. In collaboration with the European Commission an expert group elaborated a proposal for research on possible health effects of RF fields, emitted by mobile telephones, which is now included in the Framework V-Programme. European ICNIRP members have given advice to the DG V concerning the public exposure to EMF. The result was a Council Recommendation on limiting exposure of the general public to electromagnetic fields, based on ICNIRP's EMF guidelines, which was approved last summer. One of the most important issues will be the work on reviews of the biological and health effects of static and ELF-Fields (this work started in 1998), on radiofrequency fields and on optical radiation. The reviews will contain a detailed health risk assessment and can be used from WHO and IARC for the revision of WHO's Health Criteria documents. Other issues will be the revision of the guidelines on UV-radiation, on Airbome Ultrasound and on EMF. The statements on UV-sunbeds and on the Use of Magnetic Resonance methods will be revised. One important issue is - in collaboration with WHO - the process of an International Harmonisation of EMF standards. One problem of the Commission are financial subsidies. ICNIRP owes great gratitude to the German Ministry of Environment for providing resources to maintain the ICNIRP secretariat and to IRPA and WHO for grants that allow ICNIRP to continue its independent activities. Unfortunately, the EU stopped its funding in 1998, so that ICNIRP has to look for other sources of funding. (author)

  16. Nuclear Regulatory Commission staff development of the license application review plan for a high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Johnson, R.L.; Holonich, J.J.; Lee, M.P.; Delligatti, M.S.

    1993-01-01

    The Nuclear Regulatory Commission staff has recently started a new initiative to develop the License Application Review Plan (LARP) which the staff will use in its reviews of the U.S. Department of Energy's (DOE's) license application (LA) for a geologic repository for the disposal of high-level radioactive waste (HLW). This paper describes the staff's approach for developing the LARP, the development schedule and current status, the organization and content of the LARP, and the staff's LA review strategy. Therefore, it gives a preview of the draft LARP which will be made available in late 1993. It also describes how the LARP will be used as guidance to the staff in conducting reviews of regulatory and technical issues important to the licensing of a geologic repository. Finally, the benefits to the NRC staff, DOE, and other parties are discussed

  17. Changing Housing Patterns in Metropolitan Washington

    Science.gov (United States)

    Grier, George; Grier, Eunice

    1975-01-01

    This testimony, before a public hearing of the New York City Commission on Human Rights in May 1974, summarizes extensive studies of changing minority residential patterns in metropolitan Washington and less extensive studies of other groups; the prospects for future desegregation and for using the growing economic potential of minority families…

  18. Commissioning of a grid-based Boltzmann solver for cervical cancer brachytherapy treatment planning with shielded colpostats.

    Science.gov (United States)

    Mikell, Justin K; Klopp, Ann H; Price, Michael; Mourtada, Firas

    2013-01-01

    We sought to commission a gynecologic shielded colpostat analytic model provided from a treatment planning system (TPS) library. We have reported retrospectively the dosimetric impact of this applicator model in a cohort of patients. A commercial TPS with a grid-based Boltzmann solver (GBBS) was commissioned for (192)Ir high-dose-rate (HDR) brachytherapy for cervical cancer with stainless steel-shielded colpostats. Verification of the colpostat analytic model was verified using a radiograph and vendor schematics. MCNPX v2.6 Monte Carlo simulations were performed to compare dose distributions around the applicator in water with the TPS GBBS dose predictions. Retrospectively, the dosimetric impact was assessed over 24 cervical cancer patients' HDR plans. Applicator (TPS ID #AL13122005) shield dimensions were within 0.4 mm of the independent shield dimensions verification. GBBS profiles in planes bisecting the cap around the applicator agreed with Monte Carlo simulations within 2% at most locations; differing screw representations resulted in differences of up to 9%. For the retrospective study, the GBBS doses differed from TG-43 as follows (mean value ± standard deviation [min, max]): International Commission on Radiation units [ICRU]rectum (-8.4 ± 2.5% [-14.1, -4.1%]), ICRUbladder (-7.2 ± 3.6% [-15.7, -2.1%]), D2cc-rectum (-6.2 ± 2.6% [-11.9, -0.8%]), D2cc-sigmoid (-5.6 ± 2.6% [-9.3, -2.0%]), and D2cc-bladder (-3.4 ± 1.9% [-7.2, -1.1%]). As brachytherapy TPSs implement advanced model-based dose calculations, the analytic applicator models stored in TPSs should be independently validated before clinical use. For this cohort, clinically meaningful differences (>5%) from TG-43 were observed. Accurate dosimetric modeling of shielded applicators may help to refine organ toxicity studies. Copyright © 2013 American Brachytherapy Society. Published by Elsevier Inc. All rights reserved.

  19. SU-E-T-189: Commission Range Shifter On a Spot Scanning Proton System Using Raystation Treatment Planning System

    International Nuclear Information System (INIS)

    Ding, X; Wu, H; Rosen, L

    2015-01-01

    Purpose: To treat superficial target e.g. chest wall, head&neck or cranial cases, we commissioned two range shifter(RS) in Raystation4.0 with 7.37cm(RS1) and 4.1cm(RS2) Water Equivalent Thickness(WET) respectively. However, current beam model has limitations due to the secondary scattered proton. This study provides a detailed and critical commission data and provides suggestions for using RS in clinic. Methods: RS’ WET was verified by Multi-Layer Ionization Chamber from 120MeV to 226.7MeV before TPS modeling. Spot characteristics were measured using 2D scintillate detector at ISO with different air gap. A 8×8×10cm3 cube is created in 8cm depth of water to verify the absolute dose accuracy. Plans were created with different air gap using both RS. Absolute dose verification was measured along the central axis from distal end to surface using PPC05. 10 clinical RS2 plans were measured using MatriXXPT in 3 planes (proximal, distal and midSOBP). Results: RS material’s proton stopping power is energy dependent(from 70MeV to 226.7MeV) ranging from 7.42 to 7.31cm and from 4.10 to 4.03cm respectively. We chose 7.37cm (RS1) and 4.10cm (RS2) to favor the low and median proton energy. With different air gap(3cm to 32cm), spot size expands from 3.2mm to 5.5mm(RS1) and from 3.1mm to 4.1mm(RS2) respectively(226.7MeV in air, 1-sigma). For the absolute dose verification, the larger air gap and shallower depth causes larger discrepancy between TPS and measurements. All 10 clinical plans with 5–10cm air gap passed gamma index 95% with 3%/3mm criteria and outputs differences were within 3%. Conclusion: We strongly recommend each institution to verify the WET independently and choose the value to fit the clinical needs. To minimize the output difference in Raystation4.0 while avoid potential collision to the patient, we recommend to use 5–10cm air gap to minimize the output difference within 2% and preferably use RS with smaller WET if possible

  20. Mega drought in the Colorado River Basin, water supply, and adaptive scenario planning for the Phoenix Metropolitan Area; simulations using WaterSim 5.

    Science.gov (United States)

    Sampson, D. A.

    2015-12-01

    The Decision Center for a Desert City (DCDC), a boundary organization, bridges science and policy (to foster knowledge-based decision making); we study how decisions are made in the face of uncertainty. Our water policy and management model for the Phoenix Metropolitan Area (hereafter "Phoenix"), termed WaterSim, represents one such bridging mechanism. We evaluated the effect of varying the length of drought on water availability for Phoenix. We examined droughts (starting in 2000) lasting 15, 25, and 50 years. We picked a 60-year window of runoff estimates from the paleo reconstruction data for the Colorado River (CO) (1121 through 1180 A.D.), and the two local rivers (1391 through 1450 A.D.), and assumed that the proportional difference in median flow between these periods and the long-term record represented an estimate of potential drought reductions on river flows. This resulted in a 12%, and 19% reduction in flows for the CO River and the Salt-Verde (SV) Rivers, respectively. WaterSim uses 30-year trace periods from the historical flow records to simulate river flow for future projections. We used each 30-year trace from the historical record (1906 to present, CO River; 1945 to present SV Rivers) , and default settings, to simulate 60 year projections of Lake Mead elevation and the accompanying Colorado River water shortages to Phoenix. Overall, elevations for Lake Mead fell below the 1st shortage sharing tier (1075 ft) in 83% of the simulations; 74% of the simulations fell below the 2nd tier (1050 ft), and 64% fell below the 3rd (1025 ft). Length of drought, however, determined the shortage tiers met. Median elevations for droughts ending in 2015, 2025, and 2050 were 1036, 1019, and 967 feet msl, respectively. We present the plausible water futures with adaptive anticipatory scenario planning for the projected reductions in surface water availability to demonstrate decision points for water conservation measures to effectively manage shortage conditions.

  1. SU-E-T-194: Commissioning of Monaco Treatment Planning System On An Elekta VersaHD Linear Accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Narayanasamy, G; Bosse, C; Saenz, D; Cruz, W; Papanikolaou, N; Stathakis, S [University of Texas Health Science Center at San Antonio, TX (United States); Mavroidis, P [University of North Carolina, Chapel Hill, NC (United States)

    2015-06-15

    Purpose: The Monaco treatment planning system (TPS) uses a Monte-Carlo algorithm based dose computation engine to model the photon beams of a linear accelerator. The aim is to perform verification of Monaco TPS beam modeling of a Elekta VersaHD linac with 6MV, 6MV FFF, 10 MV, 10MV FFF, 18MV photon beams and 160 multileaf collimators (MLC) with a projected width of 5-mm at the isocenter. Methods: A series of dosimetric tests were performed to validate Monaco calculated beams including point dose measurement in water with and without heterogeneity and 2-dimensional dose distributions on a Delta4 bi-planar diode dosimeter array (Scandidos, Uppsala, Sweden). 3D conformal beams of different field sizes, source-to-surface distances, wedges, and gantry angles were delivered onto a phantom consisting of several plastic water and Styrofoam slabs. Point dose measurements were verified with a PTW 31013 Semiflex 0.3 cc ionization chamber (PTW, Freiburg, Germany). In addition, 8 step and shoot intensity modulated radiotherapy (IMRT) and volumetric modulated arc radiotherapy (VMAT) beams included in the Monaco TPS commissioning suite were verified against measurements on Delta4 to test and fine tune parameters in the beam model. IMRT verification was computed using gamma analysis with dose difference and distance-to-agreement criteria of 3%/3mm with a dose threshold of 10%. Results: Point dose measurements agreed within 2% in the homogeneous phantom and within 3% in the heterogeneous phantom for all photon energies. IMRT beams yielded a passing percentage of 99.1±1.1% in the gamma analysis which is well above the institutional passing threshold of 90%. Conclusion: Monaco TPS commissioning was successfully performed for all the photon energies on the Elekta VersaHD linac prior to clinical usage.

  2. SU-E-T-194: Commissioning of Monaco Treatment Planning System On An Elekta VersaHD Linear Accelerator

    International Nuclear Information System (INIS)

    Narayanasamy, G; Bosse, C; Saenz, D; Cruz, W; Papanikolaou, N; Stathakis, S; Mavroidis, P

    2015-01-01

    Purpose: The Monaco treatment planning system (TPS) uses a Monte-Carlo algorithm based dose computation engine to model the photon beams of a linear accelerator. The aim is to perform verification of Monaco TPS beam modeling of a Elekta VersaHD linac with 6MV, 6MV FFF, 10 MV, 10MV FFF, 18MV photon beams and 160 multileaf collimators (MLC) with a projected width of 5-mm at the isocenter. Methods: A series of dosimetric tests were performed to validate Monaco calculated beams including point dose measurement in water with and without heterogeneity and 2-dimensional dose distributions on a Delta4 bi-planar diode dosimeter array (Scandidos, Uppsala, Sweden). 3D conformal beams of different field sizes, source-to-surface distances, wedges, and gantry angles were delivered onto a phantom consisting of several plastic water and Styrofoam slabs. Point dose measurements were verified with a PTW 31013 Semiflex 0.3 cc ionization chamber (PTW, Freiburg, Germany). In addition, 8 step and shoot intensity modulated radiotherapy (IMRT) and volumetric modulated arc radiotherapy (VMAT) beams included in the Monaco TPS commissioning suite were verified against measurements on Delta4 to test and fine tune parameters in the beam model. IMRT verification was computed using gamma analysis with dose difference and distance-to-agreement criteria of 3%/3mm with a dose threshold of 10%. Results: Point dose measurements agreed within 2% in the homogeneous phantom and within 3% in the heterogeneous phantom for all photon energies. IMRT beams yielded a passing percentage of 99.1±1.1% in the gamma analysis which is well above the institutional passing threshold of 90%. Conclusion: Monaco TPS commissioning was successfully performed for all the photon energies on the Elekta VersaHD linac prior to clinical usage

  3. More planned economy than market economy in the energy policy strategy for 2020 of the European Commission; Mehr Plan- als Marktwirtschaft in der energiepolitischen Strategie 2020 der Europaeischen Kommission

    Energy Technology Data Exchange (ETDEWEB)

    Haucap, Justus; Coenen, Michael

    2011-04-15

    The Europeanization of energy policies is desirable because the three main objectives of energy policy (climate protection, security of supply and competitiveness) have cross-border impacts. Hence, it is good that the European Union has been granted a competence for energy policy in the article 194 of the Lisbon treaty. In addition, it is good that the European Commission has published its long-term strategy to stabilize expectations which is important for infrastructure investment. It is regrettable though that price signals, competition and market principles only play a minor role for the Commission while rather doubtful objectives such as fostering energy efficiency and promoting renewable dominate the agenda. The Commission's strategy is mainly characterized by bureaucratic dirigisme, intense regulation, state planning and public subsidies. The road to a centrally planned energy industry is being walked down fast.

  4. Recommendations for the commissioning and use of a radiotherapy treatment planning system (TPS). S.F.P.M. report nr 27, December 1, 2010

    International Nuclear Information System (INIS)

    Rosenwald, Jean Claude; Bonvalet, Laurent; Mazurier, Jocelyne; Metayer, Christine; Beaudre, Anne; Garcia, Robin; Ruchaud, Romain; Dedieu, Veronique; Bramoulle, Celine; Caselles, Olivier; Lacaze, Brigitte; Mazurier, Jocelyne

    2010-01-01

    This report aims at bringing risks related to the use of Treatment Planning Systems (TPS) to the attention of French medical physicists, and to provide them with practical, precise and updated recommendations related to new legal requirements on commissioning and use of a new planning system. It addresses TPS used in external radiation therapy. It is based on various international (IAEA, ESTRO, AAPM, and so on) and national recommendations, and proposes some rules of good practices for the implementation of a quality insurance policy as well as for the procurement and implementation of a new planning system, as for the performance follow-up of an already installed system. The authors address the following issues: risks associated with the use of a TPS, organisational aspects, dose calculation algorithms and required precision, TPS acceptance, adjustment and tests, periodic controls, treatment plan verification procedures

  5. LA COLECTIVIZACIÓN DE LA VIVIENDA EN EL SUBURBIO DE BAJA DENSIDAD. APROXIMACIONES A PROPÓSITO DEL PLAN TERRITORIAL METROPOLITANO DE BARCELONA / The collectivization of housing in the low density suburbs. Approaches regarding the regional metropolitan plan

    Directory of Open Access Journals (Sweden)

    Roger Joan Sauquet Llonch

    2011-11-01

    that are of concern, but also the dependence of the inhabitants on the car and the inadequacy of public transport. To minimize commuting, the Regional Metropolitan Plan of Barcelona proposes to insert density pockets within these areas. However, the Plan has no specific architectural proposals, but simply points towards one direction. Beyond the environmental criteria, this article uses this proposal of the Plan to reflect on what sensitivities suburban collective housing should respect, understanding that it is with the inhabitant and their way of life in mind that we must begin to address the “collectivization” of the suburb. The approach is made by reviewing examples of residential architecture that emerged at different times of the twentieth century which resolved, one way or another, the relationship of the house with a private outdoor space, a relationship of particular importance for any suburban dweller. These models fall into three groups: workers’ housing in the first third of the century, the terraced buildings generated during the Modern Movement and the “unfinished” residential designs of the third world. After looking at the resources used in these models we conclude with a series of inspired considerations, while in other recent residential examples we attempt to illuminate the current dilemma between density and suburb.

  6. Modeling Metropolitan Detroit transit.

    Science.gov (United States)

    2010-10-01

    "The seven-county Southeast Michigan region, that encompasses the Detroit Metropolitan Area, : ranks fifth in population among top 25 regions in the nation. It also ranks among bottom five in : the transit service provided, measured in miles or hours...

  7. Land Use and Land Cover, Existing land use derived from orthoimagery. Ground-truthing from discussion with local plan commission members., Published in 2000, 1:12000 (1in=1000ft) scale, Portage County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Land Use and Land Cover dataset current as of 2000. Existing land use derived from orthoimagery. Ground-truthing from discussion with local plan commission members..

  8. SU-E-T-572: Beam Characteristics and Treatment Planning Commissioning for a New Proton Therapy Unit

    International Nuclear Information System (INIS)

    Zhao, T; Sun, B; Grantham, K; Santanam, L; Goddu, S; Klein, E

    2014-01-01

    Purpose: A single-room proton system, the Mevion S250, was introduced into the arena of proton radiotherapy by Mevion Medical Systems. The first unit was installed and operates at the S. Lee Kling Proton Therapy Center at Barnes-Jewish Hospital. The objective of this abstract is to report the system's beam characteristics and Eclipse commissioning. Methods: Commissioning data were acquired for modelling longitudinal fluence, virtual source position, effective source position, source size and Bragg peaks in Eclipse. Stoichiometric CT calibration was generated via ICRU44 human. Spread-out Bragg peaks (SOBP) were measured with Parallel Plate Chamber and profiles with solid state detector for model validation. Heterogeneity effects were measured with bone and lung inserts in the beam line. RT dose was computed in a virtual water phantom, and exported from Eclipse to compare with measurements at various depths and axis. SOBPs were fine-tuned with partial shining correction and entry correction to match measurements. Output factor was measured for each individual field with an ADCL ion chamber in a water tank and fitted to a polynomial function to cross-check the monitor unit verification. Results: Ranges of all 24 options were measured within ±1mm tolerance. Modulations met a ±1mm or ±2% tolerance. SOBP flatness met a ±3% tolerance. Distal fall off (80%-20%) were measured between 6mm and 7mm for all options. Virtual source positions varied between 177cm and 195cm, decreasing with field size and range. SOBP generated by Eclipse agreed with measurements within ±3% in the entry region, and ±1%/±1mm in other regions. Sanity check for output achieved 5% accuracy in 98% of cases. Conclusion: The commissioning of the first Mevions S250 proton therapy system met specifications. The unit has been put in clinical operation since 12/17/2013

  9. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  10. The Tshwane metropolitan municipality and strategic partnerships in ...

    African Journals Online (AJOL)

    ... Tshwane Metropolitan Municipality commissioned research to investigate the potential of strategic partnerships for the optimal facilitation and co-operative governance of sport and recreation. The aim of this project was to identify the possible structure and nature of partnerships in order to facilitate effective management, ...

  11. Implementation of the validation testing in MPPG 5.a "Commissioning and QA of treatment planning dose calculations-megavoltage photon and electron beams".

    Science.gov (United States)

    Jacqmin, Dustin J; Bredfeldt, Jeremy S; Frigo, Sean P; Smilowitz, Jennifer B

    2017-01-01

    The AAPM Medical Physics Practice Guideline (MPPG) 5.a provides concise guidance on the commissioning and QA of beam modeling and dose calculation in radiotherapy treatment planning systems. This work discusses the implementation of the validation testing recommended in MPPG 5.a at two institutions. The two institutions worked collaboratively to create a common set of treatment fields and analysis tools to deliver and analyze the validation tests. This included the development of a novel, open-source software tool to compare scanning water tank measurements to 3D DICOM-RT Dose distributions. Dose calculation algorithms in both Pinnacle and Eclipse were tested with MPPG 5.a to validate the modeling of Varian TrueBeam linear accelerators. The validation process resulted in more than 200 water tank scans and more than 50 point measurements per institution, each of which was compared to a dose calculation from the institution's treatment planning system (TPS). Overall, the validation testing recommended in MPPG 5.a took approximately 79 person-hours for a machine with four photon and five electron energies for a single TPS. Of the 79 person-hours, 26 person-hours required time on the machine, and the remainder involved preparation and analysis. The basic photon, electron, and heterogeneity correction tests were evaluated with the tolerances in MPPG 5.a, and the tolerances were met for all tests. The MPPG 5.a evaluation criteria were used to assess the small field and IMRT/VMAT validation tests. Both institutions found the use of MPPG 5.a to be a valuable resource during the commissioning process. The validation testing in MPPG 5.a showed the strengths and limitations of the TPS models. In addition, the data collected during the validation testing is useful for routine QA of the TPS, validation of software upgrades, and commissioning of new algorithms. © 2016 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of

  12. SU-F-T-406: Verification of Total Body Irradiation Commissioned MU Lookup Table Accuracy Using Treatment Planning System for Wide Range of Patient Sizes

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, D; Chi, P; Tailor, R; Aristophanous, M; Tung, S [UT MD Anderson Cancer Center, Houston, TX (United States)

    2016-06-15

    Purpose: To verify the accuracy of total body irradiation (TBI) measurement commissioning data using the treatment planning system (TPS) for a wide range of patient separations. Methods: Our institution conducts TBI treatments with an 18MV photon beam at 380cm extended SSD using an AP/PA technique. Currently, the monitor units (MU) per field for patient treatments are determined using a lookup table generated from TMR measurements in a water phantom (75 × 41 × 30.5 cm3). The dose prescribed to an umbilicus midline point at spine level is determined based on patient separation, dose/ field and dose rate/MU. One-dimensional heterogeneous dose calculations from Pinnacle TPS were validated with thermoluminescent dosimeters (TLD) placed in an average adult anthropomorphic phantom and also in-vivo on four patients with large separations. Subsequently, twelve patients with various separations (17–47cm) were retrospectively analyzed. Computed tomography (CT) scans were acquired in the left and right decubitus positions from vertex to knee. A treatment plan for each patient was generated. The ratio of the lookup table MU to the heterogeneous TPS MU was compared. Results: TLD Measurements in the anthropomorphic phantom and large TBI patients agreed with Pinnacle calculated dose within 2.8% and 2%, respectively. The heterogeneous calculation compared to the lookup table agreed within 8.1% (ratio range: 1.014–1.081). A trend of reduced accuracy was observed when patient separation increases. Conclusion: The TPS dose calculation accuracy was confirmed by TLD measurements, showing that Pinnacle can model the extended SSD dose without commissioning a special beam model for the extended SSD geometry. The difference between the lookup table and TPS calculation potentially comes from lack of scatter during commissioning when compared to extreme patient sizes. The observed trend suggests the need for development of a correction factor between the lookup table and TPS dose

  13. The Lhc beam commissioning

    International Nuclear Information System (INIS)

    Redarelli, S.; Bailey, R.

    2008-01-01

    The plans for the Lhc proton beam commissioning are presented. A staged commissioning approach is proposed to satisfy the request of the Lhc experiments while minimizing the machine complexity in early commissioning phases. Machine protection and collimation aspects will be tackled progressively as the performance will be pushed to higher beam intensities. The key parameters are the number of bunches, k b , the proton intensity pe bunch, N, and the β in the various interaction points. All together these parameters determine the total beam power and the complexity of the machine. We will present the proposed trade off between the evolution of these parameters and the Lhc luminosity performance.

  14. Metropolitan vision making - using backcasting as a strategic learning process to shape metropolitan futures

    NARCIS (Netherlands)

    Neuvonen, A.; Ache, P.M.

    2014-01-01

    Abstract: The need for new forward looking tools in urban planning is immense: The new functional relations and structures are stretching beyond our capacity to 'rationally' capture modern metropolitan spaces Neuman & Hull 2009). At the same time cities struggle to find tools to help manage a

  15. Commissioning of a Monte Carlo treatment planning system for clinical use in radiation therapy; Evaluacion de un sistema de planificacion Monte Carlo de uso clinico para radioterapia

    Energy Technology Data Exchange (ETDEWEB)

    Zucca Aparcio, D.; Perez Moreno, J. M.; Fernandez Leton, P.; Garcia Ruiz-Zorrila, J.

    2016-10-01

    The commissioning procedures of a Monte Carlo treatment planning system (MC) for photon beams from a dedicated stereotactic body radiosurgery (SBRT) unit has been reported in this document. XVMC has been the MC Code available in the treatment planning system evaluated (BrainLAB iPlan RT Dose) which is based on Virtual Source Models that simulate the primary and scattered radiation, besides the electronic contamination, using gaussian components for whose modelling are required measurements of dose profiles, percentage depth dose and output factors, performed both in water and in air. The dosimetric accuracy of the particle transport simulation has been analyzed by validating the calculations in homogeneous and heterogeneous media versus measurements made under the same conditions as the dose calculation, and checking the stochastic behaviour of Monte Carlo calculations when using different statistical variances. Likewise, it has been verified how the planning system performs the conversion from dose to medium to dose to water, applying the stopping power ratio water to medium, in the presence of heterogeneities where this phenomenon is relevant, such as high density media (cortical bone). (Author)

  16. MPLS for metropolitan area networks

    CERN Document Server

    Tan, Nam-Kee

    2004-01-01

    METROPOLITAN AREA NETWORKS AND MPLSRequirements of Metropolitan Area Network ServicesMetropolitan Area Network OverviewThe Bandwidth DemandThe Metro Service Provider's Business ApproachesThe Emerging Metro Customer Expectations and NeedsSome Prevailing Metro Service OpportunitiesService Aspects and RequirementsRoles of MPLS in Metropolitan Area NetworksMPLS PrimerMPLS ApplicationsTRAFFIC ENGINEERING ASPECTS OF METROPOLITAN AREA NETWORKSTraffic Engineering ConceptsNetwork CongestionHyper Aggregation ProblemEasing CongestionNetwork ControlTactical versus Strategic Traffic EngineeringIP/ATM Overl

  17. Commission on Legal Matters

    CERN Multimedia

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  18. Accurate model of photon beams as a tool for commissioning and quality assurance of treatment planning calculations

    International Nuclear Information System (INIS)

    Linares Rosales, Haydee M.; Lara Mas, Elier; Alfonso Laguardia, Rodolfo

    2015-01-01

    Simulation of a linear accelerator (linac) head requires determining the parameters that characterize the primary electron beam striking on the target which is a step that plays a vital role in the accuracy of Monte Carlo calculations. In this work, the commissioning of photon beams (6 MV and 15 MV) of an Elekta Precise accelerator, using the Monte Carlo code EGSnrc, was performed. The influence of the primary electron beam characteristics on the absorbed dose distribution for two photon qualities was studied. Using different combinations of mean energy and radial FWHM of the primary electron beam, deposited doses were calculated in a water phantom, for different field sizes. Based on the deposited dose in the phantom, depth dose curves and lateral dose profiles were constructed and compared with experimental values measured in an arrangement similar to the simulation. Taking into account the main differences between calculations and measurements, an acceptability criteria based on confidence limits was implemented. As expected, the lateral dose profiles for small field sizes were strongly influenced by the radial distribution (FWHM). The combinations of energy/FWHM that best reproduced the experimental results were used to generate the phase spaces, in order to obtain a model with the motorized wedge included and to calculate output factors. A good agreement was obtained between simulations and measurements for a wide range of fi eld sizes, being all the results found within the range of tolerance. (author)

  19. The Military Compensation and Retirement Modernization Commissions Blended Retirement Plan: A First Look at Marine Corps Implications

    Science.gov (United States)

    2016-03-01

    of war as its “ultimate auditor .”16 The value of force management changes must be explained to Marines and their families in terms that:  Clearly...neighborhoods, send children to good schools, keep families safe, and buy the things needed for day-to-day living. This is why people work and why...plan appears to be rapidly working its way through the legislative process in a form closely resembling the MCRMC recommendation. As the services

  20. The power industry of the Magadan oblast: part of the Leninist GOELRO (State Commission for the Electrification of Russia) plan

    Energy Technology Data Exchange (ETDEWEB)

    Pozdnyak, I.G.; Anishchenko, Ye.B.

    1981-01-01

    A brief history is given of the development of the Magadan oblast's power industry, which is inseparably connected with development of the very rich raw material resources and fast development of the mining industry. In 1985 completion of construction of the Kolyma GES is planned; with the end of its construction will begin preparatory work one Ust'-Srednekansk GES: the second GES of the Kalyma falls. Work has begun since 1981 to expand the third phase of the Magadan heat and electric power plant. In 1982 completion of installation of power equipment at the Arkagalinsk State regional power plant is planned. In the 11th five-year plan construction of the system of 220 kV power lines will be finished, and 110 and 35 kV power distribution lines will be built. A special place belongs to construction of the Lankovskaya thermal power plant, which will aid in creating a stable fuel-energy base with a positive future. Chukotka power will be further developed. By 1990, 18 more state farms should be connected to the state power system. Completing the power basis in the Magadan oblast will enable an acceleration in its development, and a rise in the material and cultural standard of living of the people of the Far Northeast.

  1. Characterization of the diamond detector for commissioning the Eclipse Planning System; Caracterizacao do detector de diamante para comissionamento do Sistema de Planejamento Eclipse

    Energy Technology Data Exchange (ETDEWEB)

    Pavan, Guilherme A.; Cardoso, Domingos de O.; Fontes, Gladson S., E-mail: pavanguilherme@gmail.com [Grupo COI, Rio de Janeiro, RJ (Brazil). Servico de Radioterapia; Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil). Secao de Engenharia Nuclear SE7

    2017-11-01

    Diamond detectors are an option in the commissioning of linear accelerators, especially in small field measurements due to characteristics such as: small sensitive volume (0.004mm{sup 3}) and low energy dependence, desirable attributes for PDP measurements, output factors and profiles. The purpose of this study was to characterize PTW microDiamond 60019 diamond detector in relation to linearity, dependencies: energy, directional and with dose rate; Besides comparing measurements of PDP, output factors and profiles with some ionization and diode chambers. We also analyzed two models of the Eclipse planning system, performed with data from the commissioning of a TrueBeam accelerator obtained with the CC13 camera and with the diamond. Linearity deviations less than 0.5% were obtained in the range of 50cGy to 20Gy for energies of 6,10 and 15MV. Variations smaller than 0.5% for energy dependence and dose rate and angular dependence less than 0.5% in the axial and polar directions were observed. In the small-field output factors the diamond presented higher relative readings to the chambers: CC13, PintPoint3D and CC01 and similar to the diode. In the PDP it showed superiority in the definition of the buildup and surface regions. In the small field profiles it was shown a better definition of the penumbra in relation to the ionization chambers and in relation to the diode was equivalent, being superior in the tail region of large fields. In both models of Eclipse there were no significant differences for 1%3mm gamma analysis for PDP and profiles, although the diamond presented smaller mean gamma errors. The Collimator Backscatter Factors (CBSF) analysis for the two sets of measures showed differences mainly for small fields. The results of this study indicate that the diamond detector is one of the most versatile on the market in different commissioning situations, especially for small field measurements. (author)

  2. Dosimetric tests for treatment planning commissioning in 3DCRT; Testes dosimetricos para comissionamento de sistemas de planejamento em radioterapia 3DCRT

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Leandro R.; Pieri, Karen; Silva, Marco A.; Santos, Gabriela R.; Sales, Camila P.; Rubo, Rodrigo A.; Nakandakari, Marcos V.N.; Cunha, Ana Paula V; Santos, Caroline Z.; Rodrigues, Laura N.; Furnari, Laura, E-mail: leandrorg11@hotmail.com [Universidade de Sao Paulo (USP), SP (Brazil). Hospital das Clinicas. Servico de Radioterapia

    2012-12-15

    The radiotherapy evolution from 2D treatments to 3D conformal treatments was possible after the advent the treatment planning systems commercially available and tridimensional images techniques like computed tomography. These systems have tools that allow delineate anatomical structures from tomographic images. Calculations dose tools allow the planner evaluate the dose received in the anatomical structures. When these systems are acquired or an upgrade is made many dosimetric and non-dosimetric tests need to be performed to know the system limitations and correct functioning and to verify the correct dosimetric data insertion. This study was based in International Atomic Energy Agency protocols, Task Groups documents from American Association of Physics in Medicine, and other papers. A dosimetric test set was done to commissioning the Eclipse 10.0.28 (Varian Medical Systems) treatments planning system This version has two photon calculation algorithm (Pencil Beam Convolution and Analytical Anisotropic Algorithm – AAA) and Gaussian Pencil Beam algorithm for electron beams. However, tests for AAA it was not performed. In this study was possible to conclude that the dosimetric data was correctly added in the treatment planning system. Some results allowed to understand the algorithm limitations to calculate dose distributions in specifics situations, that was not clinically relevant in our routine. (author)

  3. Commission 1

    African Journals Online (AJOL)

    state" to provide the Commission with information on the measures that they have ...... policies and identify the gaps in ensuring the full realisation of socio- economic .... Boulle L, Harris Band Hoexter C Constitutional and Administrative Law.

  4. Joint Commission

    Science.gov (United States)

    ... for the latest publication of The Joint Commission Journal on Quality and Patient Safety (JQPS). . How We Work Process improvement program breeds quality culture, empowers staff An article in Quality Progress, June ...

  5. DESY: HERA commissioning

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  6. Nr 257 - Opinion presented on the behalf of the Commission of sustainable development and land planning on the finance bill for 2013 (nr 235), Volumes 1-10, ecology, sustainable development and planning, regional policies, research and higher education

    International Nuclear Information System (INIS)

    Krabal, Jacques; Sermier, Jean-Marie; Gaillard, Genevieve; Baupin, Denis; Pauvros, Remi; Benisti, Jacques Alain; Fromantin, Jean-Christophe; Calmette, Alain; Plisson, Philippe; Ginesy, Charles-Ange

    2012-01-01

    This huge document comprises ten volumes which present and discuss public programs (objectives, strategies, plans, and actions), public finances, economic activity data and evolutions, debates by commissions, and amendments on different issues. A first set of issues deals with ecology, sustainable development and planning: protection of the environment and risk prevention (volume 1), and then with sustainable development policies (vol. 2), landscapes, water, biodiversity, and geographic and cartographic information (vol. 3), ecological transition (vol. 4), road, railway and water transports (vol. 5), air transports (vol. 6), maritime affairs (vol. 7). The next volume addresses regional policies (vol. 8). The last parts concern research and higher education: research in the field of sustainable development (vol. 9) and in the fields of environments and resources (vol. 10)

  7. Designing metropolitan landscapes for biodiversity: deriving guidelines from metapopulation ecology

    NARCIS (Netherlands)

    Opdam, P.F.M.; Steingröver, E.G.

    2008-01-01

    The decentralization of planning is giving local planning groups more power in decision making on the spatial development of metropolitan landscapes. However, because scientific knowledge is rarely used in these decision-making processes, there is a risk of discrepancies between the conservation

  8. non-metropolitan stars

    Directory of Open Access Journals (Sweden)

    Elena Grigoryeva

    2017-06-01

    Full Text Available Capitals gather constellations of bright and creative people, attracting them from the peripheries. Tchekhov’s sisters were anxious to get to Moscow, d’Artagnan – to Paris. Evtushenko, Shukshin and Gaidai ascended to the climax of their glory, having moved to the capital. Vampilov, Rasputin and Astafiev became internationally famous without leaving their home grounds, but having joined in the metropolitan whirl. In this regard, the architectural profession differs greatly from the literary and cinematographic ones. The destinies of the masters who fulfilled themselves far from the capital are different but equally bright and unique. The Irkutsk “Varangians”of the sixtieth – Voronezhsky, Bukh and Pavlov – built up their relations with geography in a different way:someone came from the capitals just for a few years that became the brightest, the most fruitful and the most interesting years of his creative life. But someone stayed in the non-metropolitan city for a long time and even forever. This subsection contains certain examples of self-fulfillment in the cities distant from the capitals: Khabarovsk, Irkutsk, Bratsk, Krasnoyarsk, Kemerovo and Anzhero-Sudzhensk.

  9. SU-F-T-138: Commissioning and Evaluating Dose Computation Models for a Dedicated Proton Line Scanning Beam Nozzle in Eclipse Treatment Planning System

    Energy Technology Data Exchange (ETDEWEB)

    Tsai, P [Chang Gung Memorial Hospital, Proton and Radiation Therapy Center, Tao-yuan, Taiwan (China); Chang Gung University, Taoyuan, Taiwan (China); Huang, H; Cai, S; Chen, H; Wu, S; Wu, T; Lee, S; Yeh, C; Wu, T [Chang Gung Memorial Hospital, Proton and Radiation Therapy Center, Tao-yuan, Taiwan (China); Lee, C [Chang Gung University, Taoyuan, Taiwan (China)

    2016-06-15

    Purpose: In this study, we present an effective method to derive low dose envelope of the proton in-air spot fluence at beam positions other than the isocenter to reduce amount of measurements required for planning commission. Also, we demonstrate commissioning and validation results of this method to the Eclipse treatment planning system (version 13.0.29) for a Sumitomo dedicated proton line scanning beam nozzle. Methods: The in-air spot profiles at five beam-axis positions (±200, ±100 and 0 mm) were obtained in trigger mode using a MP3 Water tank (PTW-Freiburg) and a pinpoint ionization chamber (model 31014, PTW-Freiburg). Low dose envelope (below 1% of the center dose) of the spot profile at isocenter was obtained by repeated point measurements to minimize dosimetry uncertainty. The double Gaussian (DG) model was used to fit and obtain optimal σ1, σ2 and their corresponding weightings through our in-house MATLAB (Mathworks) program. σ1, σ2 were assumed to expand linearly along the beam axis from a virtual source position calculated by back projecting fitted sigmas from the single Gaussian (SG) model. Absolute doses in water were validated using an Advanced Markus chamber at the depth of 2cm with Pristine Peak (BP) R90d ranging from 5–32 cm for 10×10 cm2 scanned fields. The field size factors were verified with square fields from 2 to 20 cm at 2cm and before BP depth. Results: The absolute dose outputs were found to be within ±3%. For field size factor, the agreement between calculated and measurement were within ±2% at 2cm and ±3% before BP, except for the field size below 2×2 cm2. Conclusion: The double Gaussian model was found to be sufficient for characterizing the Sumitomo dedicated proton line scanning nozzle. With our effective double Gaussian fitting method, we are able to save significant proton beam time with acceptable output accuracy.

  10. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. DOE responses to comments from U.S. Nuclear Regulatory Commission and Colorado Department of Public Health and Environment

    International Nuclear Information System (INIS)

    1998-01-01

    This report contains responses by the US Department of Energy to comments from the US Nuclear Regulatory Commission and the Colorado Department of Public Health and Environment on the Naturita remedial action plan. This was done in an attempt to clarify information. The site is an inactive uranium processing site at Naturita, Colorado

  11. An objective index of walkability for research and planning in the Sydney metropolitan region of New South Wales, Australia: an ecological study.

    Science.gov (United States)

    Mayne, Darren J; Morgan, Geoffrey G; Willmore, Alan; Rose, Nectarios; Jalaludin, Bin; Bambrick, Hilary; Bauman, Adrian

    2013-12-24

    walkability areas. Associations were similar for full and abridged indexes. The abridged Sydney Walkability Index has predictive validity for utilitarian walking, will inform urban planning in Sydney, and will be used as an objective measure of neighbourhood walkability in a large population cohort. Abridged walkability indexes may be useful in settings where retail floor area data are unavailable.

  12. WE-F-16A-06: Using 3D Printers to Create Complex Phantoms for Dose Verification, Quality Assurance, and Treatment Planning System Commissioning in Radiotherapy

    International Nuclear Information System (INIS)

    Kassaee, A; Ding, X; McDonough, J; Reiche, M; Witztum, A; Teo, B

    2014-01-01

    Purpose: To use 3D printers to design and construct complex geometrical phantoms for commissioning treatment planning systems, dose calculation algorithms, quality assurance (QA), dose delivery, and patient dose verifications. Methods: In radiotherapy, complex geometrical phantoms are often required for dose verification, dose delivery and calculation algorithm validation. Presently, fabrication of customized phantoms is limited due to time, expense and challenges in machining of complex shapes. In this work, we designed and utilized 3D printers to fabricate two phantoms for QA purposes. One phantom includes hills and valleys (HV) for verification of intensity modulated radiotherapy for photons, and protons (IMRT and IMPT). The other phantom includes cylindrical cavities (CC) of various sizes for dose verification of inhomogeneities. We evaluated the HV phantoms for an IMPT beam, and the CC phantom to study various inhomogeneity configurations using photon, electron, and proton beams. Gafcromic ™ films were used to quantify the dose distributions delivered to the phantoms. Results: The HV phantom has dimensions of 12 cm × 12 cm and consists of one row and one column of five peaks with heights ranging from 2 to 5 cm. The CC phantom has a size 10 cm × 14 cm and includes 6 cylindrical cavities with length of 7.2 cm and diameters ranging from 0.6 to 1.2 cm. The IMPT evaluation using the HV phantom shows good agreement as compared to the dose distribution calculated with treatment planning system. The CC phantom also shows reasonable agreements for using different algorithms for each beam modalities. Conclusion: 3D printers with submillimiter resolutions are capable of printing complex phantoms for dose verification and QA in radiotherapy. As printing costs decrease and the technology becomes widely available, phantom design and construction will be readily available to any clinic for testing geometries that were not previously feasible

  13. Underground gas storage Uelsen: Findings from planning, building and commissioning. Part 1: Deposit; Untertagegasspeicher Uelsen: Erkenntnisse aus Planung, Bau und Inbetriebnahme. Teil 1: Lagerstaette

    Energy Technology Data Exchange (ETDEWEB)

    Wallbrecht, J.; Beckmann, H.; Reiser, H.; Wilhelm, R. [BEB Erdgas und Erdoel GmbH, Hannover (Germany)

    1998-12-31

    The underground gas storage at Uelsen which was built as a H-gas storage in a former variegated sandstone gasfield in Western Lower Saxony close to the town of Nordhorn has added to the gas supply system of the BEB Erdgas and Erdoel GmbH. The underground storage is connected to the Bunde-Rheine transport pipeline BEB-grid gas system by a 27 km pipeline and is a consequent expansion of BEB`s underground storage/transport system. Planning, building and commissioning were handled by BEB. Findings to date are described. [Deutsch] Der Untertagegasspeicher (UGS) Uelsen, der in einem ehemaligen Buntsandstein Gasfeld im westlichen Niedersachsen in der Naehe der Stadt Nordhorn als H-Gasspeicher eingerichtet wurde, hat die BEB Erdgas und Erdoel GmbH eine weitere Staerkung ihres Gasversorgungssystems erreicht. Der UGS Uelsen ist ueber eine 27 km lange Anbindungsleitung mit der zum BEB - Ferngasleitungssystems gehoerenden Bunde-Rheine Transportleitung verbunden und stellt eine konsequente Erweiterung des BEB Untertagegasspeicher-/Transportsystems dar. Planung, Bau und Inbetriebnahme erfolgten durch BEB im Rahmen einer integrierten bereichsuebergreifenden Projektbearbeitung. Die hierbei gewonnenen Erkenntnisse werden im Folgenden fuer den Untertagebereich dargestellt. (orig.)

  14. Bill asserting the national commitment for the environment (declared urgency), text from the commission of economy, sustainable development and town and country planning

    International Nuclear Information System (INIS)

    2009-07-01

    The bill asserting the French national commitment for the environment (also named 'Grenelle 2') is considered as the juridical tool-box of the French environmental policy. It confirms, strengthens, and concretizes the objectives defined by the Grenelle 1 law. The main dispositions of the bill concern the following domains: settlement and urbanism with the improvement of the energy efficiency, energy conservation and life-cycle of buildings; transports with the development of sustainable transportation systems; energy with the creation of regional climate, air and energy schemes with the aim of developing renewable energies (with some restrictions concerning wind power) and reducing CO 2 emissions; biodiversity with the creation of ecological pathways between protected areas for the migration of flora and fauna species; environment and waste management with the reinforcement of measures for the abatement of environmental pollutant effects. Among the numerous dispositions involving more than 20 codes (urbanism, environment, buildings etc..) one concerns the progressive implementation of a 'carbon price' index taking into account the greenhouse gas emission costs during the whole life cycle of a product, another one concerns the monitoring of indoor air quality in public buildings. This document is the text of the bill as prepared by the Commission of economy, sustainable development and town and country planning. (J.S.)

  15. Metropolitan Lima: area profile.

    Science.gov (United States)

    Hakkert, R

    1986-11-01

    This profile of metropolitan Lima, Peru, covers administrative divisions; population growth; age distribution; ethnicity and religion; housing and households; education and health care; economic activity, income, and consumption; transport and communication; and sources of information. Nearly 30% of Peru's entire population and 42% of its urban population live in Lima. The trend continues, yet Lima's urban primacy is waning due to the growth of some regional centers like Trujillo and Chimbote. Lima is still almost 10 times as large as the country's next ranking cities, Trujillo on the northern coast and Arequipa in the south. Peru's main administrative divisions are the 24 departments, of which the Department of Lima is one. These departments are further divided into 156 provinces. Greater Lima consists of 2 such provinces, the province of Lima and the constitutional province of Callao. Although the population of Lima continues to grow, its rate of growth slowed from about 5.5% during the 1960s to about 3.9% in the 1970s. Current projections estimate a metropolitan population of 6.7 million by 1990. On the whole, Lima's age structure is somewhat older than that of the rest of Peru. The median age of the population is 22.3 years, compared to a national figure of 20.4. The proportion of persons over age 65 is only 3.6%, lower than the national average of 4.1%, due to the tendency of in-migration to concentrate people of intermediate ages in the cities. Almost 400,000 inhabitants of greater Lima are bilingual in Spanish and an indigenous language. As elsewhere in Peru, the dominant religion is Roman Catholicism. Lima is a spread out city with few high rise buildings due to the danger of earthquakes. Only 12% of Lima's households are found in apartment buildings. As in other cities of Latin America, the formal housing market is beyond the reach of a major segment of the population. Consequently, much of the urban settlement has occurred through informal self

  16. Report on the behalf of the Commission for sustainable development and land planning on the bill project, in new reading, putting an end to the search for as well as to the exploitation of hydrocarbons, and bearing various applications related to energy and to the environment (nr 370) + Appendix to the report: Text from the Commission on Sustainable Development and Land Planning - Nr 417

    International Nuclear Information System (INIS)

    Colas-Roy, Jean-Charles

    2017-01-01

    While considering objectives of limitation of temperature increase, and in order to limit the use of fossil energies likes conventional and non-conventional hydrocarbons, the exploitation of which would result in an increase of CO 2 emissions, France has to modify its rules related to hydrocarbon extraction. This bill project therefore aims at programming the end of the exploration and of the exploitation of hydrocarbons. As mentioned, some articles of this bill project concern energy regulation, or can be a transposition of a European directive. This document reports the exchanges between the members of the Commission for sustainable development and land planning during the examination of the bill project and the examination of each articles. The modifications made to each article are reported in the appendix

  17. Performance measures for metropolitan planning organizations.

    Science.gov (United States)

    2012-04-01

    Performance measurement is a topic of increasing importance to transportation agencies, as issues with : funding shortfalls and concerns about transportation system efficiency lead to a shift in how transportation : decision making is carried out. In...

  18. Governing metropolitan green infrastructure in the United States

    Science.gov (United States)

    Robert F. Young; E. Gregory McPherson

    2013-01-01

    In this paper we explore whether the enhancement of urban ecosystem services through largescale metropolitan treeplanting initiatives is being planned and executed as a component of traditional municipal government or represents new transdisciplinary strategies in environmental governance Drawing on qualitative interviews with...

  19. Commissioning of radiotherapy treatment planning systems: Testing for typical external beam treatment techniques. Report of the Coordinated Research Project (CRP) on Development of Procedures for Quality Assurance of Dosimetry Calculations in Radiotherapy

    International Nuclear Information System (INIS)

    2008-01-01

    Quality Assurance (QA) in the radiation therapy treatment planning process is essential to ensure accurate dose delivery to the patient and to minimize the possibility of accidental exposure. Computerized radiotherapy treatment planning systems (RTPSs) are now widely available in both industrialised and developing countries so, it is of special importance to support hospitals in the IAEA Member States in developing procedures for acceptance testing, commissioning and ongoing QA of their RTPSs. Responding to these needs, a group of experts developed a comprehensive report, the IAEA Technical Reports Series No 430 'Commissioning and quality assurance of computerized planning systems for radiation treatment of cancer', that provides the general framework and describes a large number of tests and procedures to be considered by the RTPS users. To provide practical guidance for implementation of IAEA Technical Reports Series No. 430 in radiotherapy hospitals and particularly in those with limited resources, a coordinated research project (CRP E2.40.13) 'Development of procedures for dosimetry calculation in radiotherapy' was established. The main goal of the project was to create a set of practical acceptance and commissioning tests for dosimetry calculations in radiotherapy, defined in a dedicated protocol. Two specific guidance publications that were developed in the framework of the Coordinated Research Project E2.40.13 are based on guidelines described in the IAEA Technical Report Series No. 430 and provide a step-by-step description for users at hospitals or cancer centres how to implement acceptance and commissioning procedures for their RTPSs. The first publication, 'Specification and acceptance testing of radiotherapy treatment planning systems' IAEA-TECDOC-1540 uses the International Electrotechnical Commission (IEC) standard IEC 62083 as its basis and addresses the procedures for specification and acceptance testing of RTPSs to be used by both manufacturers and

  20. Integrated transportation scenario planning.

    Science.gov (United States)

    2010-07-01

    Regional land usetransportation scenario planning emerged as a planning technique in U.S. : metropolitan areas in the 1990s. Building on prior work by this research team, this study continues : to track the development and expansion of regional sc...

  1. Revenues for Education in Metropolitan Areas. Chapter VI, Metropolitanism: Its Challenge to Education, 1968. Sixty-seventh Yearbook, Part I.

    Science.gov (United States)

    Alkin, Marvin C.

    For local school districts to provide equal educational opportunities throughout a metropolitan area, a school organization plan should distribute populations among districts in such a manner as to maximize the aggregate expressed demand for educational services and to provide relatively equal financial support. Consolidation of contiguous…

  2. Regional cooperation in transportation planning.

    Science.gov (United States)

    2012-02-01

    As Floridas urbanized areas grow and merge, : neighboring jurisdictions experience interrelated : problems and opportunities, and regional : cooperation becomes an imperative. In the : transportation sector, Floridas metropolitan : planning org...

  3. Plans and schedules for implementation of US Nuclear Regulatory Commission responsibilities under the Low-Level Radioactive Waste Policy Amendments Act of 1985 (P.L. 99-240)

    International Nuclear Information System (INIS)

    Dunkelman, M.M.

    1987-08-01

    This document makes available the plans and schedules for the US Nuclear Regulatory Commission's (NRC's) implementation of its responsibilities under the Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA). The present document identifies the provisions of the LLRWPAA that affect the programs of the NRC, identifies what the NRC must do to fulfill each of its requirements under the LLRWPAA, and establishes schedules for carrying out these requirements

  4. Plans and schedules for implementation of US Nuclear Regulatory Commission responsibilities under the Low-Level Radioactive Waste Policy Amendments Act of 1985 (P.L. 99-240)

    International Nuclear Information System (INIS)

    Dunkelman, M.M.; Kearney, M.S.; MacDougall, R.D.

    1986-07-01

    The purpose of this document is to make available to the states and other interested parties, the plans and schedules for the US Nuclear Regulatory Commission's (NRC's) implementation of its responsibilities under Public Law 99-240, the Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA). This document identifies the provisions of the LLRWPAA which affect the programs of the NRC, identifies what the NRC must do to fulfill each of its requirements under the LLRWPAA, and establishes schedules for carrying out these requirements. The plans and schedules are current as of June 1986

  5. LEP commissioning

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    On 14 July, as ail France celebrated the bicentenary of its revolution, CERN was the scene of a revolution of a very different kind. At 16.30 hrs, a 20 GeV positron beam went round the 27 kilometres (most of which is under French territory) of CERN's new LEP electron-positron storage ring. After more than a decade of careful planning and preparation, almost six years after groundbreaking, and two years after the start of equipment installation, the LEP team delivered on the day they had told people to mark five years ago

  6. Metropolitan City: the Italian experience

    Directory of Open Access Journals (Sweden)

    Giuseppe Franco Ferrari

    2013-12-01

    Full Text Available Due to the fact that the definitions of territorial organization are no longer adequate, the concept of “metropolitan areas” arises as a solution to resolve such deficit. This study shows the beginnings of this figure in Italy and the problems of identification and delimitation caused by the abstraction of the norms, therefore entailing a difficult implementation of the concept of metropolitan cities. By identifying these obstacles, this paper presents an analysis where it is possible to ensure compliance with this new reality in the near future.

  7. Report made on behalf of the Sustainable development and land planning Commission on the bill project adopted by the Senate, after emergency declaration, for a national commitment for the environment (No. 1965). Volume 1: Reports of the Commission works

    International Nuclear Information System (INIS)

    2010-01-01

    In the first part, this document reports hearings of the minister and State secretaries in charge of the French environmental policy who presented the various aspects of this policy. The very large second part presents and comments the bill project articles and chapters: buildings and urban planning (improvement of energy efficiency, arrangements related to urban planning), transports (development of collective urban and peri-urban transports, motor-way tolls, development of alternative good transport means), energy and climate (reduction of energy consumption and greenhouse gas emission prevention, renewable energies), biodiversity (arrangements related to agriculture, green and blue network, protection of species and habitats, sewage and water resources, sea), risks, health and wastes (noise and light pollutions, other kinds of pollution, natural and industrial risks), governance, and so on

  8. Metropolitan siting: a historical perspective

    International Nuclear Information System (INIS)

    Bunch, D.F.

    1978-09-01

    The paper discusses the development and implementation of the Reactor Site Criteria and particularly the evolving posture of the agency on the subject of metropolitan siting. The review actions on nine sites are described to illustrate the various issues and positions and to clarify at least some of the bases for current practices of the NRC staff

  9. EMMA Commissioning

    CERN Document Server

    Muratori, B D; Saveliev, Y M; Smith, S L; Tzenov, S I; Holder, D J; Berg, J S; Keil, E; Johnstone, C; Koscielniak, S R

    2010-01-01

    EMMA (Elec­tron Ma­chine with Many Ap­pli­ca­tions) is a pro­to­type non-scal­ing elec­tron FFAG to be host­ed at Dares­bury Lab­o­ra­to­ry. NS-FFAGs re­lat­ed to EMMA have an un­prece­dent­ed po­ten­tial for med­i­cal ac­cel­er­a­tors for car­bon and pro­ton hadron ther­a­py. It also rep­re­sents a pos­si­ble ac­tive el­e­ment for an ADSR (Ac­cel­er­a­tor Driv­en Sub-crit­i­cal Re­ac­tor). This paper sum­maris­es the com­mis­sion­ing plans for this ma­chine to­geth­er with the major steps and ex­per­i­ments in­volved along the way. A de­scrip­tion of how the 10 to 20 MeV beam is achieved with­in ALICE is also given, as well as ex­trac­tion from the EMMA ring to the di­ag­nos­tics line and then dump.

  10. Suburbanization and sustainability in metropolitan Moscow.

    Science.gov (United States)

    Mason, Robert J; Nigmatullina, Liliya

    2011-01-01

    Although Soviet-era urban-growth controls produced relatively sustainable metropolitan development patterns, low-density suburban sprawl has accelerated markedly in modern Russia. Distinctive features of Moscow's development history are its greenbelt, which dates from 1935 and is becoming increasingly fragmented, proliferation of satellite cities at the urban fringe, conversion of seasonal dachas into full-time residences, the very exclusive Rublevo Uspenskoe Highway development, and today's crippling traffic congestion. The recent economic crisis has slowed development and actually increased the supply of “economy-class” single-family homes, for which there is much pent-up desire but insufficient credit availability to meet the demand. A renewed commitment to sustainability's triple bottom line—environmental quality, equity, and economic prosperity—will require greater government transparency and fairness, stronger planning controls, and an expanded public transportation system.

  11. A model for environmental scanning oriented for the strategic planning of the Brazilian Nuclear Energy Commission (CNEN); Um modelo de monitoramento ambiental (environmental scanning) orientado para o planejamento estrategico da CNEN

    Energy Technology Data Exchange (ETDEWEB)

    Braga, Fabiane dos Reis

    1997-07-01

    Presently, all the organizations involved with nuclear activities must be one step ahead of what happens in the specific activity areas in order to avoid surprises, to guarantee their activity continuity and the objective extents, and taking into account the external environment influence exercised by the organization on their activities. So, it is necessary a continuous follow up of their transformations. This paper aims to structure a model of the environmental monitoring system oriented to the strategic planning of the Brazilian Nuclear Energy Commission, as function of that new informational needs viewing the fulfilment of that observed gap. (author)

  12. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  13. Large Hadron Collider commissioning and first operation.

    Science.gov (United States)

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  14. A Staged Approach to LHC Commissioning

    CERN Document Server

    Lamont, M; Brüning, Oliver Sim; Collier, P; Lauckner, R; Schmidt, R

    2006-01-01

    Effective commissioning of the LHC with beam will demand very good preparation; all concerned subsystems will need to be well-prepared and thoroughly tested before first beam. To clarify the demands on the systems involved the objectives of the commissioning phases are presented, along with a breakdown of the phases and the essential prerequisites for each. The nature of the interdependencies between the various systems is highlighted; in particular the need for a well-planned commissioning of the machine protection system.

  15. Report made on behalf of the commission of economic affairs and Plan about the project of energy orientation law, adopted in second lecture with modifications by the house of commons

    International Nuclear Information System (INIS)

    2005-01-01

    This document is the report made by Mr. H. Revol, Deputy, about the project of energy orientation law adopted by the house of commons in second lecture, after its examination by the commission of economic affairs and by the Plan. This project of law aims at fixing the main principles of the French energy policy for the next decades. It foresees: the re-launching of the French nuclear program (building of an experimental European pressurized reactor (EPR)), the reinforcement of the mastery of energy demand (3% per year, creation of energy saving certificates and reinforcement of buildings energy efficiency rules), and the sustain of renewable energies development. This document summarizes the modifications proposed by the commission for each article of the project of law before its adoption by the Senate. In the second part of the document, four columns present in parallel: the text adopted in first lecture by the House of Commons, the text adopted in first lecture by the Senate, the text adopted by the House of Commons in second lecture and the proposals of the commission. (J.S.)

  16. Optimization of the commissioning period of nuclear power plant

    International Nuclear Information System (INIS)

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  17. Commissioning MMS: Challenges and Lessons Learned

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  18. Report made on behalf of the commission of economic affairs and Plan about the project of energy orientation law, adopted in second lecture with modifications by the house of commons; Rapport fait au nom de la commission des affaires economiques et du plan (1), sur le projet de loi d'orientation sur l'energie, adopte avec modifications par l'assemblee nationale en deuxieme lecture

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This document is the report made by Mr. H. Revol, Deputy, about the project of energy orientation law adopted by the house of commons in second lecture, after its examination by the commission of economic affairs and by the Plan. This project of law aims at fixing the main principles of the French energy policy for the next decades. It foresees: the re-launching of the French nuclear program (building of an experimental European pressurized reactor (EPR)), the reinforcement of the mastery of energy demand (3% per year, creation of energy saving certificates and reinforcement of buildings energy efficiency rules), and the sustain of renewable energies development. This document summarizes the modifications proposed by the commission for each article of the project of law before its adoption by the Senate. In the second part of the document, four columns present in parallel: the text adopted in first lecture by the House of Commons, the text adopted in first lecture by the Senate, the text adopted by the House of Commons in second lecture and the proposals of the commission. (J.S.)

  19. Safety Commission databases support

    CERN Document Server

    Petit, S; CERN. Geneva. TS Department

    2005-01-01

    A collaboration project between the Safety Commission (SC) and the Controls, Safety and Engineering databases group (TS/CSE) started last year. The aim of this collaboration is to transfer several SC applications from their local environments onto the D7i-MTF EDMS framework, for which the TS/CSE group is responsible. Different domains of activity and projects have been defined in the areas of equipment management, safety inspections, accidents and risks management. Priorities have been established in collaboration with SC. This paper presents the new Safety Inspections Management system (SIM) which will be put in production before the summer 2005 and reviews the constraints of both the users and the development and operational framework that needed to be taken into account. The technical solutions adopted to assure a successful production start-up and operation of the SIM system are described. Progress on other on-going projects and plans for the next year are also reported.

  20. Best practices in developing regional transportation plans

    Science.gov (United States)

    2001-08-01

    The purpose of this study is to compare Metropolitan Planning Organization (MPO) Regional Transportation Plans (RTP) and planning processes in California with selected regions. A total of 17 MPOs were included to provide a balance of geographic locat...

  1. Assessing post apartheid settlement growth patterns using remote sensing and GIWS: A case study of Cape Town metropolitan area

    CSIR Research Space (South Africa)

    Pillay, DL

    2008-11-01

    Full Text Available The significant land-use change in South African metropolitan areas, due to urbanization, created challenges of spatial development planning, infrastructure and service provision. This paper outlines the change detection analysis method applied...

  2. Nuclear Regulatory Commission Issuances, August 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit No. 1), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Westinghouse Electric Corp. (Export of LEU to the Philippines); Issuances of Atomic Safety and Licensing Appeal Boards--Duke Power Company (Amendment to Materials License SNM-1773--Transportation of Spent Fuel from Oconee Nuclear Station for Storage at McGuire Nuclear Station); Issuances of the Atomic Safety Licensing Boards--Commonwealth Edison Company (Byron Station, Units 1 and 2), Dairyland Power Cooperative (La Crosse Boiling Water Reactor, Operating License and Show Cause), Florida Power and Light Company (St. Lucie Plant, Unit No. 2), Florida Power and Light Company (Turkey Point Nuclear Generating, Units 3 and 4), Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit 1) Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), The Regents of the University of California (UCLA Research Reactor), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3: Terminiation of Proceedings); Issuances of the Directors Denial--Florida Power and Light Company

  3. Report of the Economy, Sustainable Development and Land Planning Commission aiming at authorizing electricity final user and small companies to go back to the electricity regulated price

    International Nuclear Information System (INIS)

    2010-01-01

    This report first presents the French regulated price system by recalling the legal bases for electricity and natural gas pricing, and by describing the progressive process of the electricity and natural gas market opening in France. It outlines that a reversibility principle has been introduced along with regulated pricing in most of the European Union countries. It also comments the complexity created on this issue by successive laws in France, the consequences of the soon coming law on the new organization of the electricity market. Then, the report comments the proposition which aims at authorizing electricity household users and small companies to go back to the regulated electricity price, thereby perpetuating the reversibility principle, while maintaining a criterion of installed electricity power, including natural gas prices and new consumption sites. A table proposes a comparison between existing texts, the present law project and this Commission proposition

  4. Startup and commissioning of pressurized water reactors

    International Nuclear Information System (INIS)

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  5. Commissioning of the nuclear power plant

    International Nuclear Information System (INIS)

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  6. Green Urbanism for the Greener Future of Metropolitan Areas

    Science.gov (United States)

    Zaręba, Anna; Krzemińska, Alicja; Widawski, Krzysztof

    2016-10-01

    Intensive urbanization is swallowing municipal green areas which causes intensification of erosion, decrease in biodiversity and permanent fragmentation of habitats. In the face of these changes, a risk of irreversible damages to urban ecosystems is growing. That is why planning of solutions within the framework of Green Urbanism in metropolitan areas inhabited by over 55% of the global population is of extraordinary importance. The task of the paper is to present patterns of the Green Urbanism using selected examples of metropolitan areas as case studies. The main goal of the research is to make comparison between GU practices in different countries, in various spatial settings. The principles of triple zero framework: zero fossil-fuel energy use, zero waste, zero emissions (from low-to-no-carbon emissions) introduce not only the contemporary trends in theoretical urban planning but are dictated by practical considerations to create a healthy environment for a healthy society with a minimized environmental footprint. The research results help to identify Green Urbanism techniques used for multiple functions, including ecological, recreational, cultural, aesthetic and other uses and present opportunities for implementation of Green Urbanism solutions in metropolitan areas. To achieve healthier society and environment, highly congested and polluted cities have to be recreated through working with the existing landscape, topography and natural resources particular to the site.

  7. Deliberation Nr 2017-047. Deliberation of the Commission for regulation of energy on the 16 March 2017 bearing opinion on the decree project defining purchase conditions for the electricity produced by installations mounted on building and using photovoltaic solar energy, with a peak power less than or equal to 100 kilowatts such as those defined in the 3. of the article D. 314-15 of the Code of Energy, and located in continental metropolitan France

    International Nuclear Information System (INIS)

    Carenco, Jean-Francois; Chauvet, Christine; Edwige, Catherine; Gassin, Helene; Padova, Yann; Sotura, Jean-Pierre

    2017-01-01

    After a brief presentation of the context, of the referral, and of the CRE (commission for the regulation of energy) ability, this document proposes an overview of the decree project in terms of concerned installations, and of payment conditions. These conditions are addressed in terms of levels, of evolution, of premium in relationship with integration to the building, of tariff indexing. The next part proposes a profitability analysis. It addresses various calculation hypotheses used to model business plans (total sale, installations for self-consumption), and analyses initial payment levels for a total sale and for sale of surplus. Additional remarks are made regarding the energy production level, guarantee deposit, certificate of compliance, communication between producer and network manager, rules to define the limits of a site, purchase contract duration, the E coefficient, and possible criteria for photovoltaic modules. The document ends with the statement of the CRE opinion on this decree project

  8. Premises for Shaping Metropolitan Areas in Romania

    Directory of Open Access Journals (Sweden)

    RAULARIAN RUSU

    2012-01-01

    Full Text Available The setting up of metropolitan areas is a process which is still in progress in Romania. The legislative framework for the creation of these areas has been built up only since 2001, and there are still a number of juridical inconsistencies concerning the association of administrative units to form metropolitan areas. On the other hand, political reasons and the fear of losing a certain degree of authority and to become subordinates of the large cities (in the case of rural municipalities also hindered the development of metropolitan areas in Romania. Nevertheless, the metropolitan areas already in existence are running a number of projects that are beneficial for most members of the association. Such positive examples may trigger the creation of the other metropolitan areas. Although the existing metropolitan areas did not yield spectacular results, the time passed since their foundation is yet too short to correctly assess their usefulness and territorial meaning. For the moment, the following metropolitan areas exist in Romania: Iaşi, Oradea, Braşov, Constanţa, Bacău, Cluj-Napoca, Târgu Mureş and Craiova. Bucharest, Timişoara, Ploieşti and Galaţi-Brăila metropolitan areas are still in process of setting up.

  9. Opinion of the Commission of sustainable development and land planning on the bill project related to the application of the precautionary principle defined in the Charter for the Environment to risks resulting from electromagnetic waves (nr 531) - Nr 585

    International Nuclear Information System (INIS)

    Tallard, Suzanne

    2013-01-01

    In a first part, this report outlines that electromagnetic waves are always more present in our environment (mobile phones, radio and television waves, electricity transport, and domestic devices), comments the concern about possible hazards related to these waves and recommendations made by different French and international organisations (WHO, ANSES, European Agency for the Environment), and outlines improvements to be brought to the bill project. The second part reports the Commission's general discussion and comments on the different articles. A first set of articles contain general measures (modifications in the environment code, in the urban planning code, and in the post and telecommunications code, advertising prohibition, information campaign on the use of mobile phone). A second set of articles address provisional and financial measures

  10. Energy strategy and corporate planning: notes by the Department of Energy, Coal, Gas and Electricity Industries. Energy Commission paper number 15

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    NCB's aim is the implementation of 'Plan for Coal' and the financial objective is to break even each year. BGC aims to supply premium contract markets and so conserve resources. Gas supplies from the Brent Field will replace the deleted supplies from the Southern Basin. The electricity industry expects demand to increase by 2.7% pa reaching 52GW in 1984/5 which can be met by existing stations and those on order, they propose to order one AGR in addition to this. Appliance marketing activities will be increased.

  11. Opinion presented on behalf of the Economic Affairs Commission on the Finance bill for 2011 (n. 2824), volume 2 Ecology, Sustainable Development and Land Planning, industry and energy

    International Nuclear Information System (INIS)

    2010-01-01

    In her introduction, the author gives a description of the difficult context and situation faced by the industrial sector in France, notably because of the growing activity of emerging countries like China, India or Brazil, but also because of the weakness of research industrial valorization and of the innovation policy (losing the manufacturing capacity leads to losing the capacity for innovation). Then, after a critic of the current policy (reform of the professional tax, a boosting plan with limited results), she comments the contents of public programmes concerning firm and job development, energy, the steering of ecology, energy, sustainable development and sea policies, research in energy and sustainable development and land planning. She comments ways and tools aimed at supporting industrial jobs through innovation: the FSI (strategic investment fund), the competitiveness poles, specific aids to small and medium sized enterprises, tax credit related to research activities. She addresses the energy sector, questioning the French supremacy in the nuclear energy and the increase of electricity price, and criticizing the management of the development of renewable energies (high expenses for no industrial development)

  12. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    Science.gov (United States)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  13. Injuries to Aboriginal populations living on- and off-reserve in metropolitan and non-metropolitan areas in British Columbia, Canada: Incidence and trends, 1986-2010

    Directory of Open Access Journals (Sweden)

    Mariana Brussoni

    2016-05-01

    Full Text Available Abstract Background Disparities in injury rates between Aboriginal and non-Aboriginal populations in British Columbia (BC are well established. Information regarding the influence of residence on disparities is scarce. We sought to fill these gaps by examining hospitalization rates for all injuries, unintentional injuries and intentional injuries across 24 years among i Aboriginal and total populations; ii populations living in metropolitan and non-metropolitan areas; and iii Aboriginal populations living on- and off-reserve. Methods We used data spanning 1986 through 2010 from BC’s universal health care insurance plan, linked to vital statistics databases. Aboriginal people were identified by insurance premium group and birth and death record notations, and their residence was determined by postal code. “On-reserve” residence was established by postal code areas associated with an Indian reserve or settlement. Health Service Delivery Areas (HSDAs were classified as “metropolitan” if they contained a population of at least 100,000 with a density of 400 or more people per square kilometre. We calculated the crude hospitalization incidence rate and the Standardized Relative Risk (SRR of hospitalization due to injury standardizing by gender, 5-year age group, and HSDA. We assessed cumulative change in SRR over time as the relative change between the first and last years of the observation period. Results Aboriginal metropolitan populations living off-reserve had the lowest SRR of injury (2.0, but this was 2.3 times greater than the general British Columbia metropolitan population (0.86. For intentional injuries, Aboriginal populations living on-reserve in non-metropolitan areas were at 5.9 times greater risk than the total BC population. In general, the largest injury disparities were evident for Aboriginal non-metropolitan populations living on-reserve (SRR 3.0; 2.5 times greater than the general BC non-metropolitan population (1

  14. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The commissioning effort is presently addressing two main areas: the commissioning of the hardware components at the pit and the coordination of the activities of the newly constituted Detector Performance groups (DPGs). At point 5, a plan regarding the service cavern and the commissioning of the connections of the off-detector electronics (for the data collection line and trigger primitive generation) to the central DAQ and the central Trigger has been defined. This activity was started early February and will continue until May. It began with Tracker electronics followed so far by HCAL and CSC. The goal is to have by May every detector commission, as much as possible, their data transfer paths from FED to Central DAQ as well as their trigger setups between TPGs and Global Level 1 trigger. The next focus is on connections of front-ends to the service cavern. This depends strongly on the installations of services. Presently the only detector which has its link fibers connected to the off-detector electr...

  15. National Knowledge Commission

    Science.gov (United States)

    Pitroda, Sam

    2007-04-01

    India's National Knowledge Commission (NKC) established by the prime minister is focused on building institutions and infrastructure in Education, Science and Technology, Innovation etc. to meet the challenges of the knowledge economy in the 21st century and increase India's competitive advantage in the global market. India today stands poised to reap the benefits of a rapidly growing economy and a major demographic advantage, with 550 million young people below the age of 25 years, the largest in the world. The NKC is focused on five critical areas of knowledge related to access, concepts, creation, applications and services. This includes a variety of subject areas such as language, translations, libraries, networks, portals, affirmative action, distance learning, intellectual property, Entrepreneurship, application in Agriculture, health, small and medium scale industries, e-governance etc. One of the keys to this effort is to build a national broadband gigabit of networks of 500 nodes to connect universities, Libraries, Laboratories, Hospitals, Agriculture institutions etc. to share resources and collaborate on multidisciplinary activities. This presentation will introduce the NKC, discuss methodology, subject areas, specific recommendation and outline a plan to build knowledge networks and specifics on network architecture, applications, and utilities.

  16. Opinion presented on behalf of the Economical Affairs Commission on the finance bill for 2010 (n. 1946) - Volume II: Sustainable ecology, development and planning. Industry and energy

    International Nuclear Information System (INIS)

    2009-10-01

    This report of the French National Assembly first presents the different programmes and actions related to energy and industry for which credits are foreseen in the French finance bill for 2010: development of firms and employment, energy policy, after-mining policy, struggle against climate change, management of ecology, energy, sustainable development, and sea policies, research in the field of energy and sustainable development and planning. The author then outlines the importance of the creation of conditions for a green growth in order to cope with an unprecedented crisis which ruins industrial employment. This implies the support of strategic sectors (energy-efficient building, evolution towards green chemistry, photovoltaic solar energy, renewable heat, innovating vehicles), the implementation of new priorities (smart grids, management of raw materials), and the emergence of ecological technologies promoted by the new tools of a climate policy (carbon tax introduction, improvement of carbon markets). It also implies an industrial output for research by means of a networking of actors (development of competitiveness poles, participation to European partnerships), and a reinforcement of the industrial horizon in the research policy (patenting, start-up development, support to innovating small and middle-sized companies, implementation of a true French capital-risk sector)

  17. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan Air Quality...

  18. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan...

  19. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD...

  20. Broadband availability in metropolitan and non-metropolitan Pennsylvania

    Directory of Open Access Journals (Sweden)

    Lawrence E. Wood

    2016-09-01

    Full Text Available Over the past few years having a broadband connection has become essential for many Internet activities. As broadband increases in importance, it becomes imperative to assess how its use and availability may vary, especially in relation to issues such as geographic location. For rural areas in particular, the availability of broadband service is especially important. This research assesses broadband service availability in rural areas of Pennsylvania, USA. In particular, it examines the extent to which Digital Subscriber Line (DSL and broadband cable modem services are being deployed throughout rural Pennsylvania. It compares this deployment with the availability of such services in the state’s urban and metropolitan areas. The results of this research suggest that there is a “digital divide” in terms of broadband availability between rural and urban areas of Pennsylvania. However, this “divide” is perhaps not as wide as might be expected. Thus, as broadband is becoming increasingly available in rural areas of the U.S. and throughout much of the rest of the world, this research concludes that while research must remain vigilant in terms of assessing advanced telecommunications availability in rural areas, future research should also be sure to focus on how such technologies can be used to promote economic and social concerns, including in relation to building online networks and diminishing social and professional isolation in rural areas.

  1. Safe LHC beam commissioning

    International Nuclear Information System (INIS)

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  2. Regulatory Commission of Alaska

    Science.gov (United States)

    Map Help Regulatory Commission of Alaska Login Forgot Password Arrow Image Forgot password? View Cart login Procedures for Requesting Login For Consumers General Information Telephone Electric Natural Gas

  3. LHC: Construction and Commissioning Status

    CERN Document Server

    Evans, Lyndon R

    2007-01-01

    The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.

  4. Metropolitan Optical Networks 1995 Annual Report

    DEFF Research Database (Denmark)

    Kristensen, Martin; Jouanno, Jean-Marc; Malone, Kevin

    1996-01-01

    The annual report describes the research carried out in the ACTS-project METON (Metropolitan Optical Networks) in 1995. L.M. Ericsson is prime contractor and 12 partners including DTU is involved in the project.......The annual report describes the research carried out in the ACTS-project METON (Metropolitan Optical Networks) in 1995. L.M. Ericsson is prime contractor and 12 partners including DTU is involved in the project....

  5. Metropolitan Optical Networks 1996 Annual Report

    DEFF Research Database (Denmark)

    Kristensen, Martin; Jouanno, Jean-Marc; Malone, Kevin

    1997-01-01

    The report desribes the reasearch carried out in the ACTS-project METON (Metropolitan Optical Networks) in 1996. L.M. Ericsson is prime contractor and 12 partners are involved in the project including DTU, i.e. EMI and MIC.......The report desribes the reasearch carried out in the ACTS-project METON (Metropolitan Optical Networks) in 1996. L.M. Ericsson is prime contractor and 12 partners are involved in the project including DTU, i.e. EMI and MIC....

  6. Guidelines for residential commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  7. Bill asserting the national commitment for the environment (declared urgency), text from the commission of economy, sustainable development and town and country planning; Projet de Loi portant engagement national pour l'environnement (urgence declaree), Texte de la Commission de L'Economie, du Developpement Durable et de L'Amenagement du Territoire

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-15

    The bill asserting the French national commitment for the environment (also named 'Grenelle 2') is considered as the juridical tool-box of the French environmental policy. It confirms, strengthens, and concretizes the objectives defined by the Grenelle 1 law. The main dispositions of the bill concern the following domains: settlement and urbanism with the improvement of the energy efficiency, energy conservation and life-cycle of buildings; transports with the development of sustainable transportation systems; energy with the creation of regional climate, air and energy schemes with the aim of developing renewable energies (with some restrictions concerning wind power) and reducing CO{sub 2} emissions; biodiversity with the creation of ecological pathways between protected areas for the migration of flora and fauna species; environment and waste management with the reinforcement of measures for the abatement of environmental pollutant effects. Among the numerous dispositions involving more than 20 codes (urbanism, environment, buildings etc..) one concerns the progressive implementation of a 'carbon price' index taking into account the greenhouse gas emission costs during the whole life cycle of a product, another one concerns the monitoring of indoor air quality in public buildings. This document is the text of the bill as prepared by the Commission of economy, sustainable development and town and country planning. (J.S.)

  8. Metropolitan Foodsheds as Spatial References for a Landscape-Based Assessment of Regional Food Supply

    NARCIS (Netherlands)

    Wascher, D.M.; Eupen, van M.; Corsi, S.; Sali, G.; Zasada, I.

    2016-01-01

    The Food Planning and Innovation for Sustainable Metropolitan Regions (FOODMETRES) project strives to assess the environmental and socioeconomic impacts of food chains, with regard to the spatial, logistical, and resource dimensions of growing food as well as the questions of food safety and quality

  9. Tokyo Metropolitan Earthquake Preparedness Project - A Progress Report

    Science.gov (United States)

    Hayashi, H.

    2010-12-01

    recovery, and life recovery. The primary target for long-term recovery, we propose, should be life recovery. To achieve this, economic recovery should be realized to secure sustainable economic growth. As the tool for economic recovery, physical recovery should deals with restoration of infrastructure, a proper land use planning, and the provision of housing for the victims. Fig. 1 The worst case scenario of Tokyo Metropolitan Earthquake

  10. Nuclear Regulatory Commission Issuances, September 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Commonwealth Edison Company (Dresden Nuclear Power Station, Unit 1), Consolidated Edison Company of New York (Indian Point, Unit 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Power Authority of the State of New York (Indian Point, Unit 3), Texas Utilities Generating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2); Issuances of Atomic Safety and Licensing Appeal Boards--Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Philadelphia Electric Company, et al. (Peach Bottom Atomic Power Statin, Units 2 and 3), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Statin, Unit No. 2), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3); Issuances of the Atomic Safety Licensing Boards--Cleveland Electric Illuminating Company, et al. (Perry Nuclear Power Plant, Units 1 and 2), Commonwealth Edison Company (Dresden Station, Units 2 and 3), Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1), Southern California Edison Company, et al. (San Onofre Nuclear Generating Station, Units 2 and 3), Texas Utilities Generating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2), Texas Utilities Generating Company, et al

  11. Rural planning organizations--their role in transportation planning and project development in Texas : technical report.

    Science.gov (United States)

    2010-10-01

    While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...

  12. Information report published in application of article 145 of the Regulation on the behalf of the Commission for sustainable development and land planning about the transition to carbon-free world. Nr 3305

    International Nuclear Information System (INIS)

    Chanteguet, Jean-Paul

    2015-01-01

    In a first chapter, this report proposes an overview of the world climate negotiation process within the COPs: structuring of the climate regime in Rio, a very slow process, a victory of market for quota over tax, the emergence of new climate geopolitics, and difficult climate governance. The second part outlines that the transition towards a de-carbonated world is not negotiable any longer because of the reality of climate change and of its consequences, and of a necessary alternative approach in front of an acknowledged failure. The third part highlights the different ways of a transition towards a more sustainable model by negotiation: evolution towards a new governance, a necessary transformation of the energy system, the assignment of a carbon price, to put the support to fossil energies into question again, to implement innovating financing means as a keystone of an ambitious agreement, to define more sustainable and more carbon saving policies (in urban planning, in production, in agriculture), to preserve and restore carbon sinks, and to territorialize climate again. The second part reports several hearings, and the content of the discussion within the Commission

  13. Information report issued by application of the article 145 of the Regulation by the mission of information on the management of radioactive materials and wastes on the behalf of the Commission on sustainable development and land planning - Nr 1218

    International Nuclear Information System (INIS)

    Bouillon, Christophe; Aubert, Julien

    2013-01-01

    This report first proposes a review of the issue of radioactive wastes in France: classification criteria, relationship between dangerousness and activity level, annual stock of radioactive wastes and materials in France, perspectives on a medium term in relationship with the evolution of the energy mix structure, a complex institutional system with different actors (Parliament, radioactive waste producers, the national agency for radioactive waste management - ANDRA, bodies and institutions in charge of regulation and control such as the ASN and the IRSN, but also NGOs and local information commissions). The next part addresses the issue of deep geological disposal of medium-activity long-life and high-activity wastes: international recommendations and solutions, other storage options (in sea or in space, sub-surface warehousing, and research on separation-transmutation), the choice made in time by France from the law of 1991 to the debate on the construction of Cigeo (the industrial centre for geological disposal). The last part addresses some questions which are still to be answered. They concern the Cigeo project (its costs, its reversibility, its integration within a land planning project), the governance and missions of the ANDRA, a better taking into account of all kinds of radioactive wastes (notably the mining wastes) and the idea of the introduction of a dangerousness threshold

  14. New Metropolitan Spaces and Metropolitan Strategies in the Face of Modernisation

    Directory of Open Access Journals (Sweden)

    Willem Salet

    2007-10-01

    Full Text Available Au début du xxie siècle, les espaces urbains traversent une période de croissance et de transformation radicale. Les villes s’étendent de plus en plus. Leur configuration spatiale devient de plus en plus décentralisée et fragmentée. La dichotomie traditionnelle entre hiérarchie urbaine et périphérie est en train de disparaître. Les nouveaux espaces métropolitains sont caractérisés par des processus de segmentation et de spécialisation à distance ainsi que par des polarisations sociales qui structurent l’espace. Les tentatives de planification des villes-régions essaient de rééquilibrer ces processus qui font éclater la ville. Cet article explore brièvement les transformations métropolitaines actuelles en utilisant une approche générique. Il se focalise également sur les stratégies des métropoles pour affronter ces défis dans le cadre de situations institutionnelles variées, un peu partout en Europe. En troisième lieu, cet article interroge les effets potentiels des projets urbains sur un rééquilibrage des transformations urbaines. Comment les grands projets urbains sont-ils conceptuellement élaborés ? Comment les alliances d’acteurs qui les soutiennent se forgent-elles ? Comment les citoyens et les groupes sociaux sont-ils impliqués de manière à produire de nouveaux espaces plus intégrés ?At the beginning of the 21st century, urban spaces can be said to be in a stage of growth and radical transformation. Cities are highly expansive, both in scale and scope. The spatial configuration of urban spaces is, however, becoming more and more decentralised and fragmentary. The traditional dichotomy between urban hierarchy and periphery is disappearing. New metropolitan spaces are characterised by distance related processes of social and economic specialisation and segmentation, and often also by splitting social polarisation. The planning agendas in city regions are trying to make add more balance to the

  15. Comparative Risk Analysis for Metropolitan Solid Waste Management Systems

    Science.gov (United States)

    Chang, Ni-Bin; Wang, S. F.

    1996-01-01

    Conventional solid waste management planning usually focuses on economic optimization, in which the related environmental impacts or risks are rarely considered. The purpose of this paper is to illustrate the methodology of how optimization concepts and techniques can be applied to structure and solve risk management problems such that the impacts of air pollution, leachate, traffic congestion, and noise increments can be regulated in the iong-term planning of metropolitan solid waste management systems. Management alternatives are sequentially evaluated by adding several environmental risk control constraints stepwise in an attempt to improve the management strategies and reduce the risk impacts in the long run. Statistics associated with those risk control mechanisms are presented as well. Siting, routing, and financial decision making in such solid waste management systems can also be achieved with respect to various resource limitations and disposal requirements.

  16. The Danish Welfare Commission

    DEFF Research Database (Denmark)

    Gjerding, Allan Næs

    2006-01-01

    on public services, and install economic incentives for the behaviour of private households. The paper then digs into the proposals of the commission that are broadly grouped into five policy target areas con-cerning (1) the ageing of the population, (2) the incentives for labour market participation, (3......The paper deals with the main report of the Danish Welfare Commission and the one-hundred-and-nine proposals on the structure of the future Danish welfare state that the com-mission has put forward. Following upon a brief review of the discussion on the work of the Danish Welfare Commission......) competitiveness in the global economy, (4) behavioural regulation of the use of public bene-fits and services, and (5) management within tight budgets of an increasing demand on health and care. Finally, the concluding section sums up the discussion and elaborates on the debate on the Welfare Commission’s work...

  17. Commissioning for Humidified Buildings

    National Research Council Canada - National Science Library

    Deal, Brian

    1998-01-01

    .... Although proper commissioning procedures have been noted to reduce the potential for approximately 70 percent of these claims, no standards exist for the control of moisture migration in building...

  18. Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission Issuance

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. A task for generations. A commission plans for the future. Pt. 2. Public participation, time required, international comparison, past conflicts; Generationenaufgabe Endlagerung. Eine Kommission plant fuer die Zukunft. T. 2. Konzept zur Oeffentlichkeitsbeteiligung, Zeitbedarf, internationaler Vergleich, Konflikte der Vergangenheit

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, Bernhard [E.ON Generation GmbH, Hannover (Germany); Jaeger, Gerd [RWTH Aachen Univ. (Germany)

    2016-10-15

    German Federal and State governments have committed the political foundations for the disposal of high radioactive, heat-generating waste with the Repository Site Selection Act (StandAG). The act defines a new site selection procedure and the ''Kommission Lagerung hoch radioaktiver Abfallstoffe'' (Commission Disposal of High Radioactive Waste). The Commission should evaluate the site selection process criteria, processes and decision-making basis, evaluate the StandAG and make proposals for public participation and transparency. The commission presented its final report on 5 July 2016. atw spoke with the representatives of industry, Dr. Bernhard Fischer and Prof. Dr. Gerd Jaeger, on the commission work.

  12. A task for generations. A commission plans for the future. Pt. 1; Generationenaufgabe Endlagerung. Eine Kommission plant fuer die Zukunft. T. 1. Arbeit und Umgang in der Kommission, Entsorgungspfad, Beteiligung der Oeffentlichkeit, Entscheidungskriterien

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, Bernhard [PreussenElektra GmbH, Hannover (Germany); Jaeger, Gerd [RWTH Aachen (Germany)

    2016-08-15

    German Federal and State governments have committed the political foundations for the disposal of high radioactive, heat-generating waste with the Repository Site Selection Act (StandAG). The act defines a new site selection procedure and the ''Kommission Lagerung hoch radioaktiver Abfallstoffe'' (Commission Storage of High Radioactive Waste). The Commission should evaluate the site selection process criteria, processes and decision-making basis, evaluate the StandAG and make proposals for public participation and transparency. The commission presented its final report on 5 July 2016. atw spoke with the representatives of industry, Dr. Bernhard Fischer and Prof. Dr. Gerd Jaeger, on the commission work.

  13. Commissioning the Linac Coherent Light Source injector

    Directory of Open Access Journals (Sweden)

    R. Akre

    2008-03-01

    Full Text Available The Linac Coherent Light Source is a SASE x-ray free-electron laser (FEL project presently under construction at SLAC [J. Arthur et al., SLAC-R-593, 2002.]. The injector section, from drive laser and rf photocathode gun through first bunch compressor chicane, was installed in the fall of 2006. The initial system commissioning with an electron beam was completed in August of 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photocathode drive laser, rf gun, photocathode, S-band and X-band rf systems, first bunch compressor, and the various beam diagnostics.

  14. The preparation and implementation of the commissioning of Qinshan nuclear power plant

    International Nuclear Information System (INIS)

    Huang Jinyuan

    1993-05-01

    The commissioning test of Qinshan Nuclear Power Plant is summarized. The preparation stage includes the organizations, commissioning programme, network planning, commissioning items, management procedures, responsibilities and interfaces between divisions, products ordering and supplying, personal training, quality assurance and the review and supervision by National Nuclear Safety Administration etc. The implementation stage includes the commissioning programme planning, intermediate hand-over inspection of the system and equipment, inspecting conditions and setting organizations for commissioning, the transition from commissioning to operating. Finally, some experiences in the commissioning test are presented in the article

  15. Decentralized Development Planning and Fragmentation of ...

    African Journals Online (AJOL)

    Using the Greater Accra Metropolitan Area (GAMA) as a case study, this paper argues that the proliferation of autonomous local government areas within the context of urban sprawl and other challenges have inhibited metropolitan-wide development planning. Keywords: Decentralization; local government; urban growth; ...

  16. Ten years after the Jali Commission

    African Journals Online (AJOL)

    Ten years have lapsed since the Jali Commission's final report became publicly available, and it is therefore an .... as the 'core business' of the department. This was seen as .... the 2009/10–2013/14 DCS Strategic Plan did the department ...

  17. Status and commissioning of the CMS experiment

    Science.gov (United States)

    Wulz, C.-E.

    2008-05-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  18. Status and Commissioning of the CMS Experiment

    CERN Document Server

    Wulz, Claudia-Elisabeth

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  19. Status and commissioning of the CMS experiment

    International Nuclear Information System (INIS)

    Wulz, C-E

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented

  20. Appalachian Regional Commission: 1982 Annual Report.

    Science.gov (United States)

    Appalachian Regional Commission, Washington, DC.

    Fiscal year 1982 was transitional for the Appalachian Regional Commission (ARC), as it was the last year of the broad economic development program and a year of reduced funding and new limits on programs. In 1981, Congress had requested that ARC prepare a plan for completion of the Appalachian highway system and for a 3 to 5 year ARC finish-up…

  1. Small-town migration to metropolitan centres: a case in Peninsular Malaysia.

    Science.gov (United States)

    Lee Boon Thong

    1979-12-01

    active migrants to the metropolitan areas was the production workers, comprising mostly laborers, building construction workers, and factory operators. 2 other important groups were sales workers and service workers. Rather than concentrating total emphasis on large urban centers, authorities should divert a portion of their developmental efforts to small towns as part of overall comprehensive urban planning. Economic revitalization of the small towns can take many forms, such as encouraging craft industries, investing labor intensive industries, or offering incentives to industries. Small towns should be given a unifying role within the city rural framework.

  2. [Urban and population development of the city of Puebla and its metropolitan area].

    Science.gov (United States)

    Barbosa Prieto, A

    1991-12-01

    Metropolitanization has been considered an important problem of regional development in developing countries. Attitudes toward the metropolis have been ambivalent in Latin America. On the 1 hand the metropolis is viewed as an obstacle to development that absorbs resources from the zone of influence and incurs high social costs of urbanization, but on the hand it is also viewed as a form of achieving levels of economic efficiency comparable to those of developed countries. Metropolitan areas should not be viewed as isolated, but rather as important points of demographic and manpower attraction, poles of economic growth and technological and cultural innovation. "Urban areas" and "metropolitan zones" are distinct ways of defining and delimiting urban phenomena. Although there is no consensus as to the exact definitions of these 2 urban units, it is generally accepted that the urban area is the city itself as well as the contiguous built up area reaching in all directions to the onset of nonurban land uses such as forests territorial extension that includes the politico-administrative units with urban characteristics such as work places and residences for nonagricultural workers, and that maintain constant and intense socioeconomic interrelations with the central city. The process of urban planning in the metropolitan zone of Puebla, Mexico, began in institutional form in 1980 with master plans for the population centers of Puebla, Amozoc, San Andres and San Pedro Cholula, and Zacatelco in the state of Tlaxcala. In 1987., an attempt was made by the governments of the states of Puebla and Tlaxcala to develop a plan for the metropolitan zone as a single unit. Population growth was greater within the city of Puebla than in the metropolitan zone from 1960-80, but after 1980 growth in the outlying areas exceeded that in the center city. The population density of the city of Puebla declined from 160/hectare in 1950 to 76/hectare in 1990, the result of progressive dispersion

  3. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  4. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  5. Radiological emergency preparedness arrangements in the European Commission

    International Nuclear Information System (INIS)

    Tanner, V.

    2002-01-01

    The purpose of this paper is to give an overview of the different procedures established within the European Commission, which are relevant to radiological emergency planning and response. Although emergency preparedness is a national responsibility within the European Union, the Commission has clearly defined operational tasks in terms of emergency information exchange and community foodstuff regulations. In addition the Commission promotes research programmes and training courses in the field

  6. Commissioning of ATLAS

    CERN Document Server

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  7. ATF2 Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  8. ATF2 COMMISSIONING

    CERN Document Server

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  9. Engaging with sustainability issues in metropolitan Chennai

    NARCIS (Netherlands)

    Kennedy, L.; Varrel, A.; Denis, E.; Dupont, V.; Dhanalakshmi, R.; Roumeau, S.; Baud, I.; Pfeffer, K.; Sridharan, N.; Vijayabaskar, M.; Suresh Babu, M.; Seifelislam, A.; Rouanet, H.; Saharan, T.

    2014-01-01

    Chennai is the largest metropolitan city in South India (8.7 million in 2011) and the provincial capital of the large state of Tamil Nadu (population 72 million in 2011). Before that, under British rule, the city was the capital of the Madras Presidency, and was known as Madras until 1996, when the

  10. Kansas City Metropolitan Community Colleges. Audit Report.

    Science.gov (United States)

    Missouri Office of the State Auditor, Jefferson City.

    This audit report reviews the employment contracts, related compensation, and other benefits provided for the chancellor and other officers of the Kansas City Metropolitan Community Colleges (KCMCC) in Missouri. The chancellor is allowed to either solicit bids or negotiate for contracted services such as architects, construction managers,…

  11. Reconceptualization Sexuality and Rethinking Homophobia in Metropolitan Campus Spaces

    Science.gov (United States)

    Deniz, Caglar

    2017-01-01

    The Metropolitan city gives non-metropolitan students an opportunity to meet new social groups. In this article, the perceptions of sexuality of those students who come from provincial areas to a metropolitan city for university education are examined within a framework of semi-structured interviews. The study on which this article is based used a…

  12. Spatial variations in US poverty: beyond metropolitan and non-metropolitan.

    Science.gov (United States)

    Wang, Man; Kleit, Rachel Garshick; Cover, Jane; Fowler, Christopher S

    2012-01-01

    Because poverty in rural and urban areas of the US often has different causes, correlates and solutions, effective anti-poverty policies depend on a thorough understanding of the ruralness or urbanness of specific places. This paper compares several widely used classification schemes and the varying magnitudes of poverty that they reveal in the US. The commonly used ‘metropolitan/non-metropolitan’ distinction obscures important socioeconomic differences among metropolitan areas, making our understanding of the geography of poverty imprecise. Given the number and concentration of poor people living in mixed-rural and rural counties in metropolitan regions, researchers and policy-makers need to pay more nuanced attention to the opportunities and constraints such individuals face. A cross-classification of the Office of Management and Budget’s metro system with a nuanced RUDC scheme is the most effective for revealing the geographical complexities of poverty within metropolitan areas.

  13. 78 FR 32295 - Commission Meeting

    Science.gov (United States)

    2013-05-29

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: June 20...

  14. 77 FR 10599 - Commission Meeting

    Science.gov (United States)

    2012-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 15...

  15. 78 FR 12412 - Commission Meeting

    Science.gov (United States)

    2013-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 21...

  16. 77 FR 28420 - Commission Meeting

    Science.gov (United States)

    2012-05-14

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: June 7, 2012, at 9...

  17. 78 FR 52601 - Commission Meeting

    Science.gov (United States)

    2013-08-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: September 19, 2013...

  18. 77 FR 70204 - Commission Meeting

    Science.gov (United States)

    2012-11-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the SUPPLEMENTARY INFORMATION section of this notice. DATES: December 14, 2012...

  19. 78 FR 69517 - Commission Meeting

    Science.gov (United States)

    2013-11-19

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: December 12, 2013...

  20. 77 FR 52106 - Commission Meeting

    Science.gov (United States)

    2012-08-28

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: September 20...

  1. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  19. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  3. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Water crisis: the metropolitan Atlanta, Georgia, regional water supply conflict

    KAUST Repository

    Missimer, Thomas M.

    2014-07-01

    Many large population centres are currently facing considerable difficulties with planning issues to secure future water supplies, as a result of water allocation and environmental issues, litigation, and political dogma. A classic case occurs in the metropolitan Atlanta area, which is a rapidly growing, large population centre that relies solely on surface water for supply. Lake Lanier currently supplies about 70% of the water demand and has been involved in a protracted legal dispute for more than two decades. Drought and environmental management of the reservoir combined to create a water shortage which nearly caused a disaster to the region in 2007 (only about 35 days of water supply was in reserve). While the region has made progress in controlling water demand by implementing a conservation plan, per capita use projections are still very high (at 511 L/day in 2035). Both non-potable reuse and indirect reuse of treated wastewater are contained in the most current water supply plan with up to 380,000 m3/day of wastewater treated using advanced wastewater treatment (nutrient removal) to be discharged into Lake Lanier. The water supply plan, however, includes no additional or new supply sources and has deleted any reference to the use of seawater desalination or other potential water sources which would provide diversification, thereby relying solely on the Coosa and Chattahoochee river reservoirs for the future. © 2014 IWA Publishing.

  17. Massage Therapy in Outpatient Cancer Care: A Metropolitan Area Analysis

    Science.gov (United States)

    Miccio, Robin Streit; Parikh, Bijal

    2017-01-01

    Massage offers cancer patients general quality of life benefits as well as alleviation of cancer-related symptoms/cancer-treatment–related symptoms including pain, anxiety, and fatigue. Little is known about whether massage is accessible to cancer patients who receive treatment in the outpatient setting and how massage is incorporated into the overall cancer treatment plan. Outpatient cancer centers (n = 78) in a single metropolitan area were included this mixed-methods project that included a systematic analysis of website information and a telephone survey. Massage was offered at only 40 centers (51.3% of total). A range of massage modalities were represented, with energy-based therapies (Reiki and Therapeutic Touch) most frequently provided. Although massage therapists are licensed health care providers in the states included in this analysis, massage was also provided by nurses, physical therapists, and other health care professionals. PMID:28845677

  18. Urban mobility regulation in metropolitan area of Mendoza

    Directory of Open Access Journals (Sweden)

    Lía Martínez

    2016-11-01

    Full Text Available Achieving the paradigm of sustainable urban mobility requires institutional capacities, appropriate policies and a regulatory framework that contains them. This work aims to contribute to the knowledge of the regulation of urban mobility in the metropolitan area of Mendoza. To this end, the current mobility regulations are assessed through indicators that are classified into three key areas: institutional and political organization, urban system and financial setup. The purpose is to account for the existence, or not, of regulatory capacities contained in the paradigm of sustainable mobility. Among the results, the absence of a policy of sustainable urban mobility is noteworthy, as well as the lack of sectorial coordination. Also of note is the absence of coordination between the urban planning system and the public transport provision. Lastly, in the financial sector, the results point to a promotion of sustainable transport modes but without such an explicit purpose.

  19. Massage Therapy in Outpatient Cancer Care: A Metropolitan Area Analysis.

    Science.gov (United States)

    Cowen, Virginia S; Miccio, Robin Streit; Parikh, Bijal

    2017-10-01

    Massage offers cancer patients general quality of life benefits as well as alleviation of cancer-related symptoms/cancer-treatment-related symptoms including pain, anxiety, and fatigue. Little is known about whether massage is accessible to cancer patients who receive treatment in the outpatient setting and how massage is incorporated into the overall cancer treatment plan. Outpatient cancer centers (n = 78) in a single metropolitan area were included this mixed-methods project that included a systematic analysis of website information and a telephone survey. Massage was offered at only 40 centers (51.3% of total). A range of massage modalities were represented, with energy-based therapies (Reiki and Therapeutic Touch) most frequently provided. Although massage therapists are licensed health care providers in the states included in this analysis, massage was also provided by nurses, physical therapists, and other health care professionals.

  20. Court of Justice of the European Communities ruling of September 22, 1988 - Rs 187/87: Radioactive effluents, EURATOM, Court of Justice of the EC - ruling concerning Art. 37 EURATOM Treaty (EAGV), nuclear power plants, member states - duties according to Art. 37 EAGV, radioactive effluents - approval of a plan of discharge according to Art. 37 EAGV, decision of the Commission concerning Art. 37 EAGV

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Headnote: Article 37 of the treaty of March 25, 1957, establishing the European Atomic Energy Community (EURATOM) is to be interpreted as follows: General information regarding a plan for the discharge of radioactive material must be submitted to the Commission of the European Communities prior to the approval of such discharges by the authorities in charge in the respective member country. (orig./HP) [de

  1. Wisconsin Department of Transportation ITS/CVO business plan

    Science.gov (United States)

    1998-06-01

    This plan is part of the national mainstreaming effort, to incorporate ITS/CVO technologies into state and metropolitan transportation planning and to coordinate ITS/CVO activities among agencies and states.

  2. 23 CFR 710.303 - Planning.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Planning. 710.303 Section 710.303 Highways FEDERAL... ESTATE Project Development § 710.303 Planning. State and local governments conduct metropolitan and statewide planning to develop coordinated, financially constrained system plans to meet transportation needs...

  3. Planning for transit-supportive development : a practitioner's guide. Section 4 : corridor planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  4. Planning for transit-supportive development : a practitioner's guide. Section 5 : local planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  5. Planning for transit-supportive development : a practitioner's guide. Section 2 : general transit-supportive development planning topics.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  6. The NRU blowdown test facility commissioning program

    Energy Technology Data Exchange (ETDEWEB)

    Walsworth, J A; Zanatta, R J; Yamazaki, A R; Semeniuk, D D; Wong, W; Dickson, L W; Ferris, C E; Burton, D H [Atomic Energy of Canada Ltd., Chalk River, ON (Canada). Chalk River Nuclear Labs.

    1990-12-31

    A major experimental program has been established at the Chalk River Nuclear Laboratories (CRL) that will provide essential data on the thermal and mechanical behaviour of nuclear fuel under abnormal reactor operating conditions and on the transient release, transport and deposition of fission product activity from severely degraded fuel. A number of severe fuel damage (SFD) experiments will be conducted within the Blowdown Test Facility (BTF) at CRL. A series of experiments are being conducted to commission this new facility prior to the SFD program. This paper describes the features and the commissioning program for the BTF. A development and testing program is described for critical components used on the reactor test section. In-reactor commissioning with a fuel assembly simulator commenced in 1989 June and preliminary results are given. The paper also outlines plans for future all-effects, in-reactor tests of CANDU-designed fuel. (author). 11 refs., 3 tabs., 7 figs.

  7. Evaluation of complete streets policy implementation by metropolitan planning organizations.

    Science.gov (United States)

    2015-09-01

    Over the last ten years, communities around the country have begun to implement comprehensive reforms : designed to ensure that roadway users of all ages and abilities can safely utilize the transportation system. : This complete streets policy frame...

  8. Metropolitan Spokane Region Water Resources Study. Appendix G. Planning Criteria

    Science.gov (United States)

    1976-01-01

    head or more of dairy cattle c. 2500 swine over 55 pounds d. 10,000 head of sheep e. 55,000 turkeys f. 100,000 laying hens or broilers g. 30,000 laying...hens or broilers with liquid manure handling systems h. 5000 ducks i. combinations of animals per schedule 317-20 IM 2. Fish production facilities. a...69). *70.93 Litter Control Model Act, 1971. *70.94 Clean Air Act. (AMD-73). *70.95 Solid Waste Management, 1969. (AMD-71). 78.52 Oil-Gas Conservation

  9. Commissioning of the LHC

    CERN Multimedia

    CERN. Geneva

    2007-01-01

    The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.

  10. Emergency response planning in hospitals, United States: 2003-2004.

    Science.gov (United States)

    Niska, Richard W; Burt, Catharine W

    2007-08-20

    This study presents baseline data to determine which hospital characteristics are associated with preparedness for terrorism and natural disaster in the areas of emergency response planning and availability of equipment and specialized care units. Information from the Bioterrorism and Mass Casualty Preparedness Supplements to the 2003 and 2004 National Hospital Ambulatory Medical Care Surveys was used to provide national estimates of variations in hospital emergency response plans and resources by residency and medical school affiliation, hospital size, ownership, metropolitan statistical area status, and Joint Commission accreditation. Of 874 sampled hospitals with emergency or outpatient departments, 739 responded for an 84.6 percent response rate. Estimates are presented with 95 percent confidence intervals. About 92 percent of hospitals had revised their emergency response plans since September 11, 2001, but only about 63 percent had addressed natural disasters and biological, chemical, radiological, and explosive terrorism in those plans. Only about 9 percent of hospitals had provided for all 10 of the response plan components studied. Hospitals had a mean of about 14 personal protective suits, 21 critical care beds, 12 mechanical ventilators, 7 negative pressure isolation rooms, and 2 decontamination showers each. Hospital bed capacity was the factor most consistently associated with emergency response planning and availability of resources.

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety nd Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  14. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  15. BROOKHAVEN: Booster commissioned

    Energy Technology Data Exchange (ETDEWEB)

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  16. Commission on Social Security

    CERN Multimedia

    Staff Association

    2010-01-01

    A commission studying past, present, and future social stakes ! For many years we have been hearing about the problems of funding of health insurance benefits in our different Member States. At CERN we are not totally immune from this problem.  To start with, let us recall that we have a mutual-benefit scheme which covers everyone for the consequences of the uncertainties in life (illness and accidents). The rules of our scheme are established by CERN in the framework of a sub-group of the Standing Concertation Committee, the CERN Health Insurance Scheme Board (CHISB), which is also in charge of managing the scheme.  The work of the “ProtSoc” (Protection Sociale – Social Security) commission, as we like to call it at the Staff Association, is to help your representatives on the CHISB, by preparing together with them the subjects and positions to be put forward and defended. This commission, which groups together the staff delegates who wish to invest their ...

  17. Metropolitan Quantum Key Distribution with Silicon Photonics

    Directory of Open Access Journals (Sweden)

    Darius Bunandar

    2018-04-01

    Full Text Available Photonic integrated circuits provide a compact and stable platform for quantum photonics. Here we demonstrate a silicon photonics quantum key distribution (QKD encoder in the first high-speed polarization-based QKD field tests. The systems reach composable secret key rates of 1.039 Mbps in a local test (on a 103.6-m fiber with a total emulated loss of 9.2 dB and 157 kbps in an intercity metropolitan test (on a 43-km fiber with 16.4 dB loss. Our results represent the highest secret key generation rate for polarization-based QKD experiments at a standard telecom wavelength and demonstrate photonic integrated circuits as a promising, scalable resource for future formation of metropolitan quantum-secure communications networks.

  18. Metropolitan Quantum Key Distribution with Silicon Photonics

    Science.gov (United States)

    Bunandar, Darius; Lentine, Anthony; Lee, Catherine; Cai, Hong; Long, Christopher M.; Boynton, Nicholas; Martinez, Nicholas; DeRose, Christopher; Chen, Changchen; Grein, Matthew; Trotter, Douglas; Starbuck, Andrew; Pomerene, Andrew; Hamilton, Scott; Wong, Franco N. C.; Camacho, Ryan; Davids, Paul; Urayama, Junji; Englund, Dirk

    2018-04-01

    Photonic integrated circuits provide a compact and stable platform for quantum photonics. Here we demonstrate a silicon photonics quantum key distribution (QKD) encoder in the first high-speed polarization-based QKD field tests. The systems reach composable secret key rates of 1.039 Mbps in a local test (on a 103.6-m fiber with a total emulated loss of 9.2 dB) and 157 kbps in an intercity metropolitan test (on a 43-km fiber with 16.4 dB loss). Our results represent the highest secret key generation rate for polarization-based QKD experiments at a standard telecom wavelength and demonstrate photonic integrated circuits as a promising, scalable resource for future formation of metropolitan quantum-secure communications networks.

  19. The Spatial Changes of Land Use in the Bucharest Metropolitan Area 1970s – 2000s

    Directory of Open Access Journals (Sweden)

    Gabriel Simion

    2010-11-01

    Full Text Available The article explore the dimension of spatial changes of land use in the Bucharest Metropolitan Area (BMA over the past forty years. Using GIS-based land use data sets of the years 1970, 1990 and 2000, combining with statistical data, we attempted to quantify the spatial pattern of land use changes in the BMA. Our findings indicate that most significantly changes occurred with arable lands that have been reduced from 77% of total metropolitan area in 1970 to 71.3% in 2000 and in same time the built up area increase from 6.2% in 1970 to 10.4% in 2000. Vineyards and orchards suffered a reduced of their spread. In the case of vineyards the percentage of total area decrease from 2.7% in 1970 to 0.8% and regarding orchards from 1.1% in 1970 to 0.6% in 2000. The growth of built up indicate the urban influence of Bucharest city on it the large metropolitan area. The decrease of vineyards and orchards can be correlated with agrarian reform passed after the fall of socialist economic system that generated many problems for the farmers that cannot continue to cultivate the land with these kinds of cultures. These findings have implication with the futures strategies on urban and metropolitan planning in this area.

  20. Regional Disparities and Social Cohesion Policies. The Case of the Metropolitan Area of Bari (Italy

    Directory of Open Access Journals (Sweden)

    ROSALINA GRUMO

    2015-06-01

    Full Text Available The role of Regions appears reconfigured by the "reshaping" of national States. Besides, under a sub-regional scale, forms of governance have been launched, redefining a new territoriality. In Italy, the role of the Regions and Cities is more and more important in the decision-making processes of the territories and it is also characterized by the recent establishment of the metropolitan cities, but still not geo-politically defined. There is, in fact, a constitutional reform process through the region's reorganization legislative autonomy and strengthening of local governments. In this context, some areas are characterized by social unrest that includes new forms of poverty, urban malaise and marginalization, due also to the financial and economic crisis whose signs of recovery are still very weak. In the European Union, the programming decisions considered the policy of development and cohesion also at the local scale. The 2014-2020 EU programming cycle, in fact, has defined the main role of metropolitan cities, but also of cities and internal areas. The contribution will analyze Puglia, region of southern Italy, and the metropolitan area of Bari, the regional capital, in order to verify policies concerning the social field, both through "strategic planning" and launching the so-called "smart city" experience. In the metropolitan city, indeed, there is already an orientation towards the "social innovation" to address the issues of social cohesion and inclusion, consistent to sustainable development.

  1. Air pollution holiday effect in metropolitan Kaohsiung

    Science.gov (United States)

    Tan, P.; Chen, P. Y.

    2014-12-01

    Different from Taipei, the metropolitan Kaohsiung which is a coastal and industrial city has the major pollution sources from stationary sources such as coal-fired power plants, petrochemical facilities and steel plants, rather than mobile sources. This study was an attempt to conduct a comprehensive and systematical examination of the holiday effect, defined as the difference in air pollutant concentrations between holiday and non-holiday periods, over the Kaohsiung metropolitan area. We documented evidence of a "holiday effect", where concentrations of NOx, CO, NMHC, SO2 and PM10 were significantly different between holidays and non-holidays, in the Kaohsiung metropolitan area from daily surface measurements of seven air quality monitoring stations of the Taiwan Environmental Protection Administration during the Chinese New Year (CNY) and non-Chinese New Year (NCNY) periods of 1994-2010. Concentrations of the five pollutants were lower in the CNY than in the NCNY period, however, that of O3 was higher in the CNY than in the NCNY period and had no holiday effect. The exclusion of the bad air quality day (PSI > 100) and the Lantern Festival Day showed no significant effects on the holiday effects of air pollutants. Ship transportation data of Kaohsiung Harbor Bureau showed a statistically significant difference in the CNY and NCNY period. This difference was consistent with those found in air pollutant concentrations of some industrial and general stations in coastal areas, implying the possible impact of traffic activity on the air quality of coastal areas. Holiday effects of air pollutants over the Taipei metropolitan area by Tan et al. (2009) are also compared.

  2. Green Infrastructure Concept for JABODETABEKJUR Metropolitan Area

    Science.gov (United States)

    Tanuwidjaja, Gunawan; Gates Chang, Bill

    2017-07-01

    Sixty “Mega Cities” would emerge by 2015 catering of 600 million populations, and were threatened by the climate change, because of cyclones, flooding, etc. Jakarta became a metro region covering Jakarta, Bogor, Tangerang, Bekasi, Depok and Cianjur. Jakarta metropolitan faced the very high population growth, urban sprawling, traffic jams, flooding, green open space reduction, environmental degradation, urban slums and illegal street hawkers. Flooding and traffic congestions were the two most important issues to solve. SWOT analysis and urban design solutions were produced to create a sustainable solution. Related to transportation issues, Singapore Mass Rapid Transport (MRT) concept was evaluated. Meanwhile the Netherlands’ polder concept as well as Singapore’s Integrated Water Management were also analyzed. The development of above ground MRT as well as Busway could be developed to connect Jakarta Metropolitan Region. The networks were developed on the main toll road networks. The MRT and Busway would eventually replace the need of automobile use in the future. The Transit - Oriented - Development (TOD) with high density can be suggested to be concentrated nearby the MRT and Busway interchange stations. The Netherlands’ polder and were adopted for urban’ low-lying lands in Jakarta Metropolitan Region, A polder system was defined as the Integrated Man-made Drainage System consisting Dikes, Drains, Retention Ponds, Outfall Structures or Pumping Stations. The polder system was proposed to be extended to Tangerang and Bekasi area.

  3. Metropolitan governance and infrastructure in São Paulo: the challenge of mediating regional interests and local impact

    Directory of Open Access Journals (Sweden)

    Marcelo Sacenco Asquino

    2010-12-01

    Full Text Available The formation of the São Paulo metropolis is related to the historical process of building regional infrastructure as of the late 19th century, in connection with economic motivation and territorial influences. Since that time, São Paulo has played a key role in the network of cities that has been fundamental to its economic development and to its recognition as the most important city in Brazil. This article examines the importance of understanding the regional scale in relation to São Paulo's plans and projects, from Plano de Avenidas (Avenue Plan in the 1930s to the Rodoanel (ring road in the 1990s; the experience of planning and management of the metropolitan system in the 1970s and, in contrast, the environmental licensing process of these large projects after the 1990s. Discussing São Paulo's plans and projects is a complex task, because a project's local impact as well as regional interests must be considered. From different perspectives, the author reviewed the results of environmental licensing of Ampliação da Calha do Rio Tietê (deepening the bed of the Tietê river and Rodoanel Trecho Sul (south section of the ring road projects, and their actual role in the future arrangement and development of the São Paulo metropolis. Based on (a the results of the metropolitan planning experience in the 1970s, (b the updating of the metropolitan discussion in the 1990s from an economic globalization perspective, and (c the current experience of metropolitan systems in the state of São Paulo, it seems necessary to re-establish an effective metropolitan planning and management system in order to guarantee its legitimacy, commitment and governance.

  4. Report on the behalf of the economy, sustainable development and land planning commission of the European resolution proposition by Mr Ladislas Poniatowski on the directive proposition by the European Parliament and Council related to energy efficiency

    International Nuclear Information System (INIS)

    Poniatowski, L.

    2011-01-01

    In its first part, this report outlines the interest of the directive proposition as energy efficiency and energy savings must be a priority for the European energy policy, that important energy saving fields are still to be explored, and that this directive is an ambitious and multi-sector oriented arrangement. The second part deals with the resolution proposition (the version proposed by M. Poniatowski and that of the commission). These propositions present the general objectives, comment the rules concerning public bodies, discuss obligation mechanisms regarding energy savings, discuss the issue of energy counting and billing, and the development of cogeneration and networks. The discussion of the commission is reported

  5. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  6. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  7. A Guide to Building Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  8. Discussion: European Commission policy

    International Nuclear Information System (INIS)

    Coldwell, R.

    1993-01-01

    This paper documents the debate which arose following two papers presented to a seminar run by the Centre for the Study of Regulated Industries, on 11th November 1992, on European Commission (EC) energy policies. The issues raised cover how an internal market for electricity and natural gas will be implemented under a proposed EC directive, bearing in mind the level of opposition from a number of Member States. How this Directive will apply to vertically integrated structures, such as Scottish Electricity Industry, is also considered. (UK)

  9. Commissioning of the SCT

    International Nuclear Information System (INIS)

    Hayward, Helen

    2010-01-01

    In September 2008, the large hadron collider (LHC) at CERN was switched on with successful tests of circulating beam in both directions of the ring. The ATLAS semiconductor tracker (SCT) has been installed in the ATLAS cavern since summer 2007 and then integrated with the rest of the ATLAS subdetectors, in preparation for this event. After the SCT was assembled on the surface, the process of being commissioned using cosmic ray events began, and continued after the SCT was installed in the cavern with the rest of the ATLAS detector. Performance results will be given for the recent cosmic runs.

  10. Atomic Energy Commission Act, 1963

    International Nuclear Information System (INIS)

    1963-01-01

    Promulgated in 1963, the Atomic Energy Commission Act (204) established and vested in the Ghana Atomic Energy Commission the sole responsibility for all matters relating to the peaceful uses of atomic energy in the country. Embodied in the Act are provisions relating to the powers, duties, rights and liabilities of the Commission. (EAA)

  11. Impact of the 2001 Tohoku-oki earthquake to Tokyo Metropolitan area observed by the Metropolitan Seismic Observation network (MeSO-net)

    Science.gov (United States)

    Hirata, N.; Hayashi, H.; Nakagawa, S.; Sakai, S.; Honda, R.; Kasahara, K.; Obara, K.; Aketagawa, T.; Kimura, H.; Sato, H.; Okaya, D. A.

    2011-12-01

    tomography of P- and S- wave structure, seismic interferometry for shallow structure and using the dense MeSO-net data. We observed the 2011 Tohoku-oki event and its aftershocks including M7.7 event off Ibaraki prefecture, which is the largest aftershock so far. We imaged source radiation energy using the MeSO-net data by the back-projection method (Honda et al., 2011). We found seismic activity in the Kanto region has been activated after the event, suggesting increased seismic hazard in Kanto region even for plate boundary events. We use a new image of PSP and Pacific plate. We evaluate potential zones of the M7+ earthquake on the plate boundary and within the PSP slab which will be used for risk mitigation study by a socio-science group. We will also discuss a future plan to continue our effort in seismic risk mitigation in Tokyo Metropolitan area, stress regime of which is seriously changed by the Tohoku-oki event. This is supported by the Special Project for Earthquake Disaster Mitigation in Tokyo Metropolitan Area

  12. Characterizing Spatial and Temporal Patterns of Thermal Environment and Air Quality in Taipei Metropolitan Area

    Science.gov (United States)

    Juang, J. Y.; Sun, C. H.; Jiang, J. A.; Wen, T. H.

    2017-12-01

    The urban heat island effect (UHI) caused by the regional-to-global environmental changes, dramatic urbanization, and shifting in land-use compositions has becoming an important environmental issue in recent years. In the past century, the coverage of urban area in Taipei Basin has dramatically increasing by ten folds. The strengthen of UHI effect significantly enhances the frequency of warm-night effect, and strongly influences the thermal environment of the residents in the Greater Taipei Metropolitan. In addition, the urban expansions due to dramatic increasing in urban populations and traffic loading significantly impacts the air quality and causes health issue in Taipei. In this study, the main objective is to quantify and characterize the temporal and spatial distributions of thermal environmental and air quality in the Greater Taipei Metropolitan Area by using monitoring data from Central Weather Bureau, Environmental Protection Administration. In addition, in this study, we conduct the analysis on the distribution of physiological equivalent temperature in the micro scale in the metropolitan area by using the observation data and quantitative simulation to investigate how the thermal environment is influenced under different conditions. Furthermore, we establish a real-time mobile monitoring system by using wireless sensor network to investigate the correlation between the thermal environment, air quality and other environmental factors, and propose to develop the early warning system for heat stress and air quality in the metropolitan area. The results from this study can be integrated into the management and planning system, and provide sufficient and important background information for the development of smart city in the metropolitan area in the future.

  13. Commission 4: Ephemerides

    Science.gov (United States)

    Kaplan, George H.; Hohenkerk, Catherine Y.; Fukushima, Toshio; Arlot, Jean-Eudes; Bangert, John A.; Bell, Steven A.; Folkner, William M.; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrák, Jan

    2012-04-01

    The Commission 4 Organizing Committee began its work for the 2009-2012 triennium by revising the commission's terms of reference, which serve as our ``mission statement.'' The new terms of reference are:(a)Maintain cooperation and collaboration between the national offices providing ephemerides, prediction of phenomena, astronomical reference data, and navigational almanacs.(b)Encourage agreement on the bases (reference systems, time scales, models, and constants) of astronomical ephemerides and reference data in the various countries. Promote improvements to the usability and accuracy of astronomical ephemerides, and provide information comparing computational methods, models, and results to ensure the accuracy of data provided.(c)Maintain databases, available on the Internet to the national ephemeris offices and qualified researchers, containing observations of all types on which the ephemerides are based. Promote the continued importance of observations needed to improve the ephemerides, and encourage prompt availability of these observations, especially those from space missions, to the science community.(d)Encourage the development of software and web sites that provide astronomical ephemerides, prediction of phenomena, and astronomical reference data to the scientific community and public.Promote the development of explanatory material that fosters better understanding of the use and bases of ephemerides and related data.

  14. The Metropolitan Area of the Municipality of Bucharest. Present-Day Features Relating to Some Environmental Issues in an International Context

    Directory of Open Access Journals (Sweden)

    INES GRIGORESCU

    2005-01-01

    Full Text Available The development of metropolitan areas represents the main characteristic of today’s urban evolution trends. The first initiatives to delimitate and define metropolitan areas have been in the United States since 1910. In Europe, this concept was adopted at the beginning of the1990s when the United States had already had 250 metropolitan areas. Romania adopted the concept of metropolitan area in the late 1990s, namely in 1997 when a study on the Directions, Ways, and Intensities of Development in the Municipality of Bucharest and its Metropolitan Zone. Environmental protection politics appeared. This made public a point of view about the Bucharest metropolitan area, which was legally defined by Law no. 351 of July 6th 2001 regarding the National Territory Management Plan, Section IV – Settlements. But many other limits of this area were also taken into account. The uncontrolled evolution of the Bucharest Metropolitan Area as well as of many other European capital cities can be stopped or stabilized by developing green belts or green areas.

  15. African urbanization in metropolitan South Africa--differential urbanization perspectives.

    Science.gov (United States)

    Geyer, H S

    1993-07-01

    "As a potentially important urban development policy consideration, attention is focused in this paper on differential urbanization trends in South Africa at the metropolitan level. Recent informal urban settlement patterns of the African population within the major metropolitan areas are contrasted against these differential urbanization trends to determine the implications of both for residential development in the metropolitan areas during the post-apartheid era." excerpt

  16. Labor Force Activity of Women in Metropolitan and Nonmetropolitan America. Rural Development Research Report No. 15.

    Science.gov (United States)

    Brown, David L.; O'Leary, Jeanne M.

    Between 1960 and 1970 economic opportunity and progress for women in American non-metropolitan areas was mixed. While women in metropolitan areas were more likely to be labor force members than were non-metropolitan women, the difference in metropolitan and non-metropolitan labor force participation rates narrowed during the period. For women…

  17. Helsinki Metropolitan Area Climate Change Adaptation Strategy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    The Helsinki Metropolitan Area Climate Change Adaptation Strategy has been prepared in close cooperation with the four cities of the metropolitan area (Helsinki, Espoo, Vantaa and Kauniainen), the Helsinki Region Environmental Services Authority HSY and other municipal, regional and state level organisations. In the strategy, strategic starting points and policies with which the metropolitan area prepares for the consequences of climate change, are compiled. The Helsinki Metropolitan Area adaptation strategy concentrates on the adaptation of the built and urban environment to the changing climate. The vision of the strategy is climate proof city - the future is built now. The strategy aims to (1) assess the impacts of climate change in the area, (2) prepare for the impacts of climate change and to extreme weather events and (3) to reduce the vulnerabilities of the area to climate variability and change. The target is to secure the well-being of the citizens and the functioning of the cities also in the changing climate conditions. The preparation of the adaptation strategy started in 2009 by producing the background studies. They include the regional climate and sea level scenarios, modelling of river floods in climate change conditions and a survey of climate change impacts in the region. Also, existing programmes, legislation, research and studies concerning adaptation were collected. The background studies are published in a report titled 'The Helsinki metropolitan area climate is changing - Adaptation strategy background studies' (in Finnish) (HSY 2010). HSY coordinated the strategy preparation. The work was carried out is close cooperation with the experts of the metropolitan area cities, regional emergency services, Ministry of the Environment, Helsinki Region Transport Authority and other regional organisations. The strategy work has had a steering group that consists of representatives of the cities and other central cooperation partners. The

  18. Model LPA Terpadu untuk Wilayah Surabaya Metropolitan

    Directory of Open Access Journals (Sweden)

    Mimien Bt. M. Al Muhdhar a Henie Irawati

    2009-02-01

    Full Text Available The purpose of this research is to establish the integrated LPA model for Surabaya Metropolitan Area. The methods used are literature overviews, comparative studies to well-established areas, and expert assistantships through national seminars. The result shows that the integrated LPA has opportunity to combine some activities such as sorting and classifying, producing, wrapping and containing, selling the compost and decayed materials, and filling residual waste by landfill system. In 25 Ha land area, 14.10 Ha is allocated for waste management, and 10.90 Ha for sanitary landfill.

  19. Evaluation of sludge management alternatives in Istanbul metropolitan area.

    Science.gov (United States)

    Cakmakci, M; Erdim, E; Kinaci, C; Akca, L

    2005-01-01

    The main concern of this paper was to predict the sludge quantities generated from 18 wastewater treatment plants, which were stated to be established in the "Istanbul Water Supply, Sewerage and Drainage, Sewage Treatment and Disposal Master Plan", 10 of which are in operation at present. Besides this, obtaining the required data to compare various treatment schemes was another goal of the study. Especially, the estimation of the sludge quantity in the case of enhanced primary sedimentation was of importance. Wastewater sludge management strategies were discussed in order to develop suggestions for Istanbul Metropolitan city. Within this context, the wastewater treatment facilities, mentioned in the Master Plan that had been completed by 2000, were evaluated in terms of sludge production rates, locations and technical and management aspects. Disposal alternatives of the wastewater treatment sludge were also evaluated in this study. Using of the dewatered sludge as a landfill cover material seems the best alternative usage. Up to the year of 2040, the requirement of cover material for landfills in Istanbul will be met by the dewatered sludge originated from wastewater treatment plants in the region.

  20. 77 FR 16221 - Notice of Commission Staff Attendance

    Science.gov (United States)

    2012-03-20

    ... Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): SPP Strategic Planning Committee Task Force on Order No. 1000 Meeting.... The above-referenced meeting is open to stakeholders. Further information may be found at www.spp.org...

  1. 77 FR 30003 - Notice of Commission Staff Attendance

    Science.gov (United States)

    2012-05-21

    ... Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): Strategic Planning Committee Task Force on Order 1000 May 18, 2012, 8:00 a..., Dallas, TX 75201. The above-referenced meeting is open to stakeholders. Further information may be found...

  2. The perception of corporate services directorate in a metropolitan municipality on King III good governance compliance in business and projects

    Directory of Open Access Journals (Sweden)

    Sly Newton Mutiro

    2015-03-01

    Full Text Available Good governance has been and is a growing phenomenon for many business organisations regardless of size, profit margins and purpose for existence. The South African Metropolitan municipality Metropolitan Municipality is one such organisation that has adopted good governance models to business practices. The challenge was how to effectively and efficiently implement governance issues around projects and business organisations. A number of people, committees and institutions have developed different governance frameworks that can be adopted by organisations as a guide to good governance. This research is based on King III guide to good governance. The objective was to establish the perceptions of the corporate services directorate in the South African Metropolitan municipality municipality on King III good governance compliance by interviewing some employees orally and through a questionnaire. The responses were captured and analysed using IMB SPSS software. Problems were identified in governance training and understanding in general. Another major finding was poor communication internally and externally. To overcome these shortfall recommendations were made. Communication models, communication plan, governance models and training were recommended. The major challenges facing the South African Metropolitan municipality Metropolitan Municipality are poor effective governance communication and lack of governance training.

  3. Planning laws and policies influencing the use of land in ...

    African Journals Online (AJOL)

    This study investigates planning laws and policies influencing land use in metropolitan Lagos. Analysis of the laws and policies were presented based on the responses on 755 questionnaires administered on occupiers and users of all categories of land uses in 43 zones into which metropolitan Lagos was divided. The

  4. Report made on the behalf of the Commission for Sustainable Development et Land Planning on European resolution proposition on the second Energy-Climate package (nr 2295) - Nr 2309

    International Nuclear Information System (INIS)

    Leroy, Arnaud

    2014-01-01

    After having noticed that, once again, the objective of reduction of world carbon intensity (greenhouse gas emissions per dollar of GDP) will not be reached, this report outlines the importance of this now undisputed environmental, strategic and economic challenge, and that the definition of objectives by the European Union of its energy and climate policy is a critical milestone before the Paris conference on Climate of 2015. It comments the content of the Energy-Climate 2030 package proposed by the European Commission in January 2014. It also recalls the content of the 2020 package which was adopted in 2008. It recalls and comments the content of the resolution proposition of the French National Assembly, the opinions stated by the Assembly, and reports the discussion of the Commission for Sustainable development, and the discussion about the bill articles

  5. 23 CFR 652.11 - Planning.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Planning. 652.11 Section 652.11 Highways FEDERAL HIGHWAY... ACCOMMODATIONS AND PROJECTS § 652.11 Planning. Federally aided bicycle and pedestrian projects implemented within... unless excluded by agreement between the State and the metropolitan planning organization. ...

  6. Commissioning the GTA accelerator

    International Nuclear Information System (INIS)

    Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Bowling, S.; Brown, S.; Cole, R.; Gilpatrick, J.D.; Garnett, R.; Guy, F.W.; Ingalls, W.B.; Johnson, K.F.; Kerstiens, D.; Little, C.; Lohsen, R.A.; Lloyd, S.; Lysenko, W.P.; Mottershead, C.T.; Neuschaefer, G.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Connolly, R.; Weiss, R.; Saadatmand, K.

    1992-01-01

    The Ground Test Accelerator (GTA) is being used to resolve the physics and engineering issues related to accelerating, focusing, and steering a high-brightness, high-current H - beam and then neutralizing it. The goal is to produce a 24 MeV, 50 mA device with a 2% duty factor. Specific features of the GTA -- injector, beam optics, rf linac structures, diagnostics, control and rf power systems are described. The first four steps in commissioning have been completed. The RFQ predicted and measured performances are in good agreement; however, the transmission is lower than specifications. Input emittance is larger than design specifications and increases the effects of image charge and multipoles. Displacement of steering magnets in either the horizontal or vertical plane caused beam displacements in both planes. It is suspected that quadrupole rotation is the cause of the coupled motion. 9 figs., 5 tabs., 11 refs

  7. GP commissioning in England.

    Science.gov (United States)

    Charlton, Rodger

    2013-02-01

    The NHS, yet again, is in transition with an emphasis on groups of general practitioners (GPs) (clinical commissioning groups) making decisions on which specialist services should be chosen for patients requiring referral from primary care. It is an area of new terminology with a new language and further change for all working in the NHS and the all-important interface between primary and secondary care, and its impact on teamwork. There are many drivers including choice, efficiency, franchising of services, coordination and leadership in an enormous organisation, but not least reducing costs and keeping to a budget. There are many logistical issues and ethical anxieties, and only time will inform patients, practitioners, stakeholders and politicians as to its success.

  8. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    D. Acosta

    Point 5 commissioning activities Since the last CMS week there has been little global commissioning activities: the first mid week global run aiming to assess the status of the hardware and DAQ software after the winter maintenance and developments has taken place two weeks ago involving all subdetectors but tracker and pixel whose hardware is still being actively worked on. The local commissioning restarted once the cooling became available again the third week of January. Below are detailed the main activities which have taken place so far. DAQ The activity of the central DAQ group during pause of global runs was focused on various items. The commissioning of the 900 new PCs which will be used to run the HLT processes has been almost completed. It is planned to use these PCs in the first global run at the start of March. In addition the location of various server PCs which host essential functionalities to get the private ".cms" network going, has been re-organized to allow to implemen...

  9. Assessing Strategies for Urban Climate Change Adaptation: The Case of Six Metropolitan Cities in South Korea

    Directory of Open Access Journals (Sweden)

    Jae-Seung Lee

    2018-06-01

    Full Text Available As interest in climate change adaptation grows, an increasing number of national and local governments are developing adaptation strategies. This study assesses the strategies for urban climate change adaptation of municipal governments in South Korea. The adaptation plans and budget expenditures of six metropolitan cities in South Korea were compared, based on the Implementation Plan for Climate Change Adaptation Strategy (IPCCAS 2012–2016 and annual expenditure reports of each city. The results show that the actual implementation of these adaptation programs varied vis-à-vis the original plans, in terms of the level of overall expenditure and sector-specific expenditure. The following findings were drawn from the analysis: First, in most cases, the highest adaptation priorities were disaster/infrastructure, water management, and the health sector. Second, actual expenditure on climate change adaptation programs was smaller than the planned budget in the IPCCAS. Third, the prioritized sectors matched for planning and implementation in Seoul, Daegu, Daejeon, and Incheon, but not in Busan and Ulsan. Fourth, the adaptation programs of South Korean metropolitan cities do not seem to have been well-tailored to each case.

  10. Business profile of metropolitan Las Vegas

    International Nuclear Information System (INIS)

    Boyle, M.R.

    1988-06-01

    This first report describes the present makeup of the Las Vegas metropolitan statistical area (MSA) economy and analyzes the climate for business expansion. The second report contains an assessment of the competitiveness of the area as a location for new or expanded facilities investment by companies in approximately 600 business groups. The third report projects Las Vegas' competitiveness at the start of the next century in the absence of a nuclear waste storage facility and then evaluates the potential impacts of siting that facility near Las Vegas on its ability to attract and retain business investment. The primary purpose of these reports is to contribute to the overall assessment of the environmental impact of the US Department of Energy's proposed action to build and operate an underground nuclear waste storage facility at Yucca Mountain. The first two reports also serve a second purpose -- they can be used by economic development organizations in the Las Vegas metropolitan area in their ongoing efforts to attract new business investment. Information contained in the business climate analysis found in this first report can be incorporated into marketing materials. The competitiveness assessment contained in the second report can be used by these organizations in identifying targets they wish to pursue

  11. Youthification in the Metropolitan Area of Cluj

    Directory of Open Access Journals (Sweden)

    Vlad Cocheci

    2018-06-01

    Full Text Available This research exercise aims to identify all areas affected by what is now known as ‘youthification’ in the Metropolitan Area of Cluj. Broadly speaking, an area touched by youthification witnesses a massive arrival of young adults, who invest in housing, but only remain there until they age. Youthification is usually the second phase within an encompassing process of gentrification. To gain a clearer picture of this phenomenon, we employed a snapshot of the situation recorded by the Population and Housing Census of 2011. Using this image as a starting point, we then applied statistical thresholds aimed at measuring the presence and intensity of youthification within different areas. Thereafter, we looked at areas exhibiting the same level of youthification, in order to find those common traits of their young adult inhabitants that might prove relevant for their choices in matters of housing. Once completed, our efforts resulted in the first map showing the areas affected by youthification within the Metropolitan Area of Cluj. In addition, we reached the following conclusion: Young adults who live in the city are more likely to still be enrolled in a form of education and less likely to be married or to have children than those who live in the suburbs or in rural areas. This observation implies that there might be some hidden dependency relations, which are at work in shaping the choice of housing.

  12. Digital and Media Literacy: A Plan of Action. A White Paper on the Digital and Media Literacy Recommendations of the Knight Commission on the Information Needs of Communities in a Democracy

    Science.gov (United States)

    Hobbs, Renee

    2010-01-01

    This report proposes a detailed plan that positions digital and media literacy as an essential life skill and outlines steps that policymakers, educators, and community advocates can take to help Americans thrive in the digital age. It offers a plan of action for how to bring digital and media literacy education into formal and informal settings…

  13. A Virtual Commissioning Learning Platform

    DEFF Research Database (Denmark)

    Mortensen, Steffen; Madsen, Ole

    2018-01-01

    The introduction of reconfigurable manufacturing systems (RMS), Industry 4.0 and the associated technologies requires the establishment of new competencies. Towards that goal, Aalborg University (AAU) has developed an Industry 4.0 learning factory, the AAU Smart Production Lab. The AAU Smart...... Production Lab integrates a number of Industry 4.0 technologies for learning and research purposes. One of the many techniques is virtual commissioning. Virtual commissioning uses a virtual plant model and real controllers (PLCs) enabling a full emulation of the manufacturing system for verification. Virtual...... commissioning can lower the commissioning time up to 63%, allowing faster time to market. However, virtual commission is still missing industrial impact one of the reasons being lack of competencies and integration experiences. The paper presents the setup of the virtual commissioning learning platform...

  14. 77 FR 33788 - Proposed Post Office Structure Plan

    Science.gov (United States)

    2012-06-07

    ... Plan AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request for an advisory opinion regarding its Post Office Structure Plan... Commission for an advisory opinion under 39 U.S.C. 3661 regarding its Post Office Structure Plan (POStPlan...

  15. Advice presented on behalf of the commission of finances, economy and plan about the law project (no. 1613) relative to the electric and gas public utilities and to the power and gas companies; Avis presente au nom de la Commission des finances, de l'economie generale et du plan sur le projet de loi (no. 1613), relatif au service public de l'electricite et du gaz et aux entreprises electriques et gazieres

    Energy Technology Data Exchange (ETDEWEB)

    Carayon, B.

    2004-06-01

    The aim of this report is to present to the French deputies the advice of the commission of finances and economy about the law project relative to the change of status of the power and gas public utilities in the framework of the deregulation of European energy markets. This law changes the juridical status of the two state monopolies Electricite de France (EdF) and Gaz de France (GdF) into two anonymous companies and creates two additional companies for the management of the power and gas networks. It ensures also the transposition of the European directives from June 26, 2003 (2003/54/CE and 2003/55/CE). It contains some proper dispositions and modifies various existing French laws, in particular the law no. 46-628 from April 8, 1946 about the electricity and gas nationalization and the law no. 2000-108 from February 10, 2000 relative to the modernization and development of the electric public utility. The first part of the document reports on the general discussions and comments made by the commission about the law project while the second part concerns the detailed analysis of the articles 16 and 22 about the pension funds of EdF and GdF agents and the change of the status of both utilities. The amendments adopted by the commission for these articles conclude the report. (J.S.)

  16. Liberalism, authority, and bioethics commissions.

    Science.gov (United States)

    MacDougall, D Robert

    2013-12-01

    Bioethicists working on national ethics commissions frequently think of themselves as advisors to the government, but distance themselves from any claims to actual authority. Governments however may find it beneficial to appear to defer to the authority of these commissions when designing laws and policies, and might appoint such commissions for exactly this reason. Where does the authority for setting laws and policies come from? This question is best answered from within a normative political philosophy. This paper explains the locus of moral authority as understood within one family of normative political theories--liberal political theories--and argues that most major "liberal" commentators have understood both the source and scope of ethics commissions' authority in a manner at odds with liberalism, rightly interpreted. The author argues that reexamining the implications of liberalism for bioethics commissions would mean changing what are considered valid criticisms of such commissions and also changing the content of national bioethics commission mandates. The author concludes that bioethicists who participate in such commissions ought to carefully examine their own views about the normative limits of governmental authority because such limits have important implications for the contribution that bioethicists can legitimately make to government commissions.

  17. Commissioning of NSLS-II

    Energy Technology Data Exchange (ETDEWEB)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  18. Commissioning and First Results from the Fermilab Cryomodule Test Stand

    Energy Technology Data Exchange (ETDEWEB)

    Harms, Elvin; et al.

    2017-05-01

    A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

  19. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    A. Ryd and T. Camporesi

    2010-01-01

    Commissioning and Run Coordination activities After the successful conclusion of the LHC pilot run commissioning in 2009 activities at the experiment restarted only late in January due to the cooling and detector maintenance. As usual we got going with weekly exercises used to deploy, debug, and validate improvements in firmware and software. A debriefing workshop aimed at analyzing the operational aspects of the 2009 pilot run was held on Jan. 15, 2009, to define a list of improvements (and relative priorities) to be planned. In the last month, most of the objectives set in the debriefing workshop have been attained. The major achievements/improvements obtained are the following: - Consolidation of the firmware for both readout and trigger for ECAL - Software implementation of procedures for raising the bias voltage of the silicon tracker and pixel driven by LHC mode changes with automatic propagation of the state changes from the DCS to the DAQ. The improvements in the software and firmware allow suppress...

  20. Commissioning the SNO+ Detector

    Science.gov (United States)

    Caden, E.; Coulter, I.; SNO+ Collaboration

    2017-09-01

    SNO+ is a multipurpose liquid scintillator neutrino experiment based at SNOLAB in Sudbury, Ontario, Canada. The experiment’s main physics goal is a search for neutrinoless double beta decay in Tellurium-130, but SNO+ will also study low energy solar neutrinos, geo- and reactor-antineutrinos, among other topics. We are reusing much of the hardware from the original SNO experiment, but significant work has taken place to transform the heavy water detector into a liquid scintillator detector. We present upgrades and improvements to the read-out electronics and trigger system to handle the higher data rates expected by a scintillator experiment. We show the successful installation and testing of a hold-down rope net for the acrylic vessel to counter-act the buoyancy of organic liquid scintillator. We also describe the new scintillator process plant and cover gas systems that have been constructed to achieve the purification necessary to meet our physics goals. We are currently commissioning the experiment with ultra-pure water in preparation for filling with scintillator in early 2017 and present the current status of this work.

  1. Post commissioning noise study

    International Nuclear Information System (INIS)

    Heraud, P.

    2008-01-01

    This presentation described a wind farm post-commissioning study conducted at a wind farm owned by Helimax Energy Inc. The farm was located in a partly-forested, partly cultivated region in Quebec that featured gently rolling hills. Over 600 dwellings were located within 2 km of the wind farm, and 44 dwellings were within the wind farm's boundaries. The noise impact assessments were conducted at various points near the wind farm. The wind farm was designed using an International Standards Organization (ISO) noise propagation model and a 40 dBA to provide adequate setbacks. The study was conducted using 10 days of continuous measurements at selected points of a wind farm. Points of reception included points from 650 m to 800 m. Noise over 2 km was not thought to be contributed by the wind turbine. The nearest dwelling was 512 m from one of the farm's wind turbines. The study also considered ground factor, temperature, relative humidity, and the height of the receptors. Quebec noise level limits are 40 dBA at night, and 45 dBA during the day. Noise level limits are independent of wind speed. Measured noise contributions over 40 dBA were not observed during the measurement program. The wind turbines were only audible for 1 night out of the 30 night study period. It was concluded that the ISO noise propagation model is a reliable tool for conducting noise impact assessments. tabs., figs

  2. LEIR commissioning successfully completed

    CERN Multimedia

    2006-01-01

    An important milestone has been passed in the preparation of the injector complex to supply ions to the LHC experiments. The LEIR lead-ion beam, seen on one of the control screens just before the PS injection region. The Low-Energy Ion Ring - LEIR for short - has passed its first tests with flying colours. On 12 May, the ring that will accumulate lead ions for the LHC was shut down after seven months of tests (see Bulletin 44/2005). 'The commissioning phase was a resounding success,' enthuses a satisfied Michel Chanel, head of the LEIR construction project. After several months of fine-tuning, the LEIR team has achieved its aim of producing the kind of beam required for first lead-ion collisions in the LHC in 2008. This involved creating bunches containing 230 million ions, in line with the specifications for those first beams. This success can be put down to the machine's outstanding design and components. 'It's a great achivement by all the teams involved in the machine's construction,' underlines Christian...

  3. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  4. Opinion on the behalf of the Commission for Sustainable Development and Land Planning on the bill project, modified by the Senate, related to sobriety, transparency, information and consultation with respect to exposure to electromagnetic waves (nr 2062). Nr 2501

    International Nuclear Information System (INIS)

    Tallard, Suzanne

    2015-01-01

    This report first recalls the evolution of the bill project with its accepted or refused amendments associated with its main articles. Those articles addressed the return of the notion of sobriety for the exposure to electromagnetic fields, the crucial role of local executive power in the information and consultation procedure in the case of new installations of relay antennas, a more reliable definition of some atypical issues, obligations of information and awareness heightening of public and users, and maintaining the taking into account of the health impact of electromagnetic waves. Discussions of the commission on general issues and on the bill project articles are reported

  5. Influence of Intimate Partner Violence on Domestic Relocation in Metropolitan and Non-Metropolitan Young Australian Women

    NARCIS (Netherlands)

    Dillon, Gina; Hussain, Rafat; Kibele, Eva; Rahman, Saifur; Loxton, Deborah

    2016-01-01

    Data from a national, population-based longitudinal study of Australian women (26-34 years) were analyzed to investigate the association between domestic relocation and multiple explanatory factors, namely intimate partner violence (IPV), metropolitan versus non-metropolitan residence, education,

  6. Radon survey in Metropolitan Toronto schools

    International Nuclear Information System (INIS)

    Becker, E.; Moridi, R.

    1992-01-01

    The radon testing survey in Metropolitan Toronto public schools was the most intensive project of its kind ever undertaken in Canadian schools. It also included an extensive public education program on radiation and radon-in-schools. The radon levels at 632 schools were measured using the CAIRS Radon Monitors. Ninety percent of the locations measured were found to have a radon level equal to or less than 2 mWL. Two locations in two different schools were found to have a radon level at or above the Action Level (20 mWL). The remaining results were between the two extremes. Follow-up testing in those schools where more than 10 mWL of radon was found is in progress. (author)

  7. Plan's CCCD approach - Country study PLAN-Bangladesh

    NARCIS (Netherlands)

    Uffelen, van G.J.

    2009-01-01

    PLAN Netherlands National Organisation has in coordination with PLAN International Headquarters commissioned an independent formative evaluation study to get systematic insight in the preconditions for appropriate functionality of Child Centred Community Development (CCCD) and to strengthen common

  8. Regional Landscape System Protection in the Urbanising Desert Southwest: Lessons from the Phoenix Metropolitan Region, USA

    Directory of Open Access Journals (Sweden)

    Laura Musacchio

    2004-12-01

    Full Text Available Through the lens of holistic landscape ecology, the authors present for public consideration a desert landscape typology and plan assessment criteria. As a case study, historical trends in open space planning and two contrasting examples of recent open space plans from the Phoenix metropolitan area were analysed and compared to the typology in order to understand how successfully the open space planning efforts had addressed protection of the regional landscape system in the Sonoran Desert. We also developed an approach for the analysis of the landscape ecological component of plans that was based on Baer's general plan assessment criteria (1997. Our results indicate the desert landscape typology is a valuable step as part of a plan assessment of two regional, open space plans, but more importantly, the assessment criteria presented in this paper could be used as the foundation for a more thorough assessment method of the landscape ecological component of plans. The desert landscape typology and plan assessment criteria presented in this paper can be used to increase understanding about how the decision making of planners and designers has influenced the temporal and spatial dimensions of landscape legacies, trajectories and transformations, such as connectivity and fragmentation of open space.

  9. Commission 31: Time

    Science.gov (United States)

    Matsakis, Demetrios; Defraigne, Pascale; Hosokawa, M.; Leschiutta, S.; Petit, G.; Zhai, Z.-C.

    2007-03-01

    The most intensely discussed and controversial issue in time keeping has been the proposal before the International Telecommunications Union (ITU) to redefine Coordinated Universal Time (UTC) so as to replace leap seconds by leap hours. Should this proposal be adopted, the practice of inserting leap seconds would cease after a specific date. Should the Earth's rotation continue to de-accelerate at its historical rate, the next discontinuity in UTC would be an hour inserted several centuries from now. Advocates of this proposal cite the need to synchronize satellite and other systems, such as GPS, Galileo, and GLONASS, which did not exist and were not envisioned when the current system was adopted. They note that leap second insertions can be and have been incorrectly implemented or accounted for. Such errors have to date had localized impact, but they could cause serious mishaps involving loss of life. For example, some GPS receivers have been known to fail simply because there was no leap second after a long enough interval, other GPS receivers failed because the leap second information was broadcast more than three months in advance, and some commercial software used for internet time-transfer Network Time Protocol (NTP) could either discard all data received after a leap second or interpret it as a frequency change. The ambiguity associated with the extra second could also disrupt financial accounting and certain forms of encryption. Those opposed to the proposal question the need for a change, and also point out the costs of adjusting to the proposed change and its inconvenience to amateur astronomers and others who rely upon astronomical calculations published in advance. Reports have been circulated that the cost of checking and correcting software to accommodate the new definition of UTC would be many millions of dollars for some systems. In October 2005 American Astronomical Society asked the ITU for a year's time to study the issue. This commission has

  10. The ATLAS Trigger System Commissioning and Performance

    CERN Document Server

    Hamilton, A

    2010-01-01

    The ATLAS trigger has been used very successfully to collect collision data during 2009 and 2010 LHC running at centre of mass energies of 900 GeV, 2.36 TeV, and 7 TeV. This paper presents the ongoing work to commission the ATLAS trigger with proton collisions, including an overview of the performance of the trigger based on extensive online running. We describe how the trigger has evolved with increasing LHC luminosity and give a brief overview of plans for forthcoming LHC running.

  11. Nuclear Regulatory Commission: 1981 annual report

    International Nuclear Information System (INIS)

    1981-01-01

    This seventh annual report of the US Nuclear Regulatory Commission covers major actions, events and planning that occurred during fiscal year 1981, with some coverage of later events, where appropriate. Chapters of the report address the agency's various functions or areas of activity: regulating nuclear power plants; evaluating reactor operating experience; licensing nuclear materials and their transportation; safeguarding nuclear plants and materials; managing nuclear wastes; inspection and enforcement; cooperation with state governments; international activities; research and standards development; hearings; decisions and litigation; and administrative and public communications matters. Each chapter presents a detailed review of program accomplishments during the report period, fiscal year 1981

  12. Nuclear Regulatory Commission Issuances, May 81

    International Nuclear Information System (INIS)

    1981-05-01

    Contents: Issuances of the Nuclear Regulatory Commission--Consolidated Edison Company of New York, Inc. (Indian Point, Unit No. 2), Power Authority of the State of New York (Indian Point, No. 3 Nuclear Power Plant), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Statement of Policy on Conduct of Licensing Proceedings, Uranium Mill Licensing Requirements; Issuances of Atomic Safety and Licensing Appeal Boards--Houston Lighting and Power Company, et al. (South Texas Project, Units 1 and 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit No. 2), Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc. (Susquehanna Steam Electric Station, Units 1 and 2), Philadelphia Electric Company et al. (Peach Bottom Atomic Power Station, Units 2 and 3), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2); Issuances of the Atomic Safety and Licensing Boards--Duke Power Company (William B. McGuire Nuclear Station, Units 1 and 2), Florida Light and Power Company (Turkey Point Nuclear Generating, Units 3 and 4), Illinois Power Company, et al. (Clinton Power Station, Units 1 and 2), Sacramento Municipal Utility District (Rancho Seco Nuclear Generating Station); Issuances of the Directors Denial--Commonwealth Edison Company (Byron Station, Units 1 and 2), Consolidated Edison Company of New York, Inc. (Indian Point Unit No. 2), Gulf States Utilities Company (River Bend Station Units 1 and 2), Petition to Suspend All Operating Licenses for Pressurized Water Reactors (River Bend Station Units 1 and 2), Portland General Electric Company (Trojan Nuclear

  13. 77 FR 14047 - Guidance for Decommissioning Planning During Operations

    Science.gov (United States)

    2012-03-08

    ...)-4014, ``Decommissioning Planning During Operations.'' This action is necessary to correct the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; correction. SUMMARY: The U...

  14. Metropolitan migration and population growth in selected developing countries.

    Science.gov (United States)

    1983-01-01

    The purpose of this article is to estimate the components of metropolitan population growth in selected developing countries during 1960-1970 period. The study examines population growth in 26 cities: 5 are in Africa, 8 in Asia, and 13 in Latin America, using data from national census publications. These cities in general are the political capitals of their countries, but some additional large cities were selected in Brazil, Mexico, and South Africa. All cities, at the beginning of the 1960-1970 decade had over 500,000 population; Accra, the only exception, reached this population level during the 1960s. Some cities had over 4 million residents in 1970. Net migration contributed about 37% to total metropolitan population growth; the remainder of the growth is attributable to natural increase. Migration has a much stronger impact on metropolitan growth than suggested by the above figure: 1) Several metropolitan areas, for various reasons, are unlikely to receive many migrants; without those cities, the share of metropolitan growth from net migration is 44%. 2) Estimates of the natural increase of migrants after their arrival in the metropolitan areas, when added to migration itself, changes the total contribution of migration to 49% in some metropolitan areas. 3) Even where net migration contributes a smaller proportion to metropolitan growth than natural increase, the rates of net migration are generally high and should be viewed in the context of rapid metropolitan population growth from natural increase alone. Finally, the paper also compares the components of metropolitan growth with the components of growth in the remaining urban areas. The results show that the metropolitan areas, in general, grow faster than the remaining urban areas, and that this more rapid growth is mostly due to a higher rate of net migration. Given the significance of migration for metropolitan growth, further investigations of the effects of these migration streams, particularly with

  15. ‘New urbanism' or metropolitan-level centralization?

    DEFF Research Database (Denmark)

    Næss, Petter

    2011-01-01

    Based on a study in Copenhagen Metropolitan Area, this paper compares the influences of macro-level and micro-level urban form characteristics on the respondents' traveling distance by car on weekdays. The Copenhagen study shows that metropolitan-scale urban structural variables generally exert...... stronger influences than neighborhood-scale built environment characteristics on the amount of car travel. In particular, the location of the residence relative to the main city center of the metropolitan region shows a strong effect. Some local scale variables often mentioned in the literature...

  16. Municipal Revenue Generation and Development in the Calgary and Edmonton Metropolitan Regions

    Directory of Open Access Journals (Sweden)

    Brian W. Conger

    2016-12-01

    Full Text Available Municipal reliance on property taxes and the competing priorities of municipalities—in terms of where they plan and approve land development within their boundaries—in order to capture new property taxes, has led to political conflict between adjacent municipalities.1 Nowhere in Alberta is this more evident than in the Edmonton and Calgary metropolitan regions, where sustained high-levels of growth has led to the expansion of the core-cities, rapid residential development rates in peripheral urban centres and the rise urban-scale development in the rural municipal districts – spurring intrametropolitan competition, harsh words and hurt feelings amongst municipalities.2 In response to this ongoing conflict, the province and at times the municipalities themselves have developed successive regional planning frameworks over the past 60 years3 to guide development and encourage—and at times enforce—intermunicipal collaboration. In an exploration of the contemporary relationship between municipal finance and development patterns in the Calgary and Edmonton metropolitan regions, we use municipal property tax and building-permit data for new residential, commercial and industrial development to track the incidence of development since 1983 and the property tax rates for municipalities in both regions from 2001 to 2015. In looking at the tax data there is evidence of increasing competition among municipalities, in particular for non-residential development; however, the trends could also be consistent with collusion. In looking at the building permit data, although there has been a lot of development in the peripheral urban and rural municipalities, proportionately, growth and development has occurred overwhelmingly in the core-cities. Our findings point to a system where local development considerations in both metropolitan regions, and the municipal prerogative to set municipal tax rates to attract development, take precedence over the

  17. Report of nuclear utility industry responses to Kemeny Commission recommendations

    International Nuclear Information System (INIS)

    1989-02-01

    Kemeny Commission recommendations, including the area of emergency planning, is provided in the Appendix

  18. Report of nuclear utility industry responses to Kemeny Commission recommendations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-02-15

    Kemeny Commission recommendations, including the area of emergency planning, is provided in the Appendix.

  19. Information report presented, in application of article 146 of the regulation, by the commission of finances, of general economy and of the plan, about the Institute of radioprotection and nuclear safety; Rapport d'information depose en application de l'article 146 du reglement par la Commission des finances, de l'economie generale et du plan, sur l'Institut de radioprotection et de surete nucleaire

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-04-01

    This report follows a control made at the French institute of radioprotection and nuclear safety (IRSN) in order to analyse how the budget allowed to this institute is used. The report presents successively: the main missions of the IRSN (competences, activities in the Paris region), the structure of incomes and expenses (the budget allowed by the Ministry of ecology and sustainable development), the difficulties encountered during the start-up of the institute (conditions of creation, budget regulation), the debate about the fiscal deficiency (fiscal regime applied and resulting difficulties), and the perspectives of evolution of the institute. The comments made by the commission after the presentation of the report are summarized in a last part. (J.S.)

  20. Information report presented, in application of article 146 of the regulation, by the commission of finances, of general economy and of the plan, about the Institute of radioprotection and nuclear safety; Rapport d'information depose en application de l'article 146 du reglement par la Commission des finances, de l'economie generale et du plan, sur l'Institut de radioprotection et de surete nucleaire

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-04-01

    This report follows a control made at the French institute of radioprotection and nuclear safety (IRSN) in order to analyse how the budget allowed to this institute is used. The report presents successively: the main missions of the IRSN (competences, activities in the Paris region), the structure of incomes and expenses (the budget allowed by the Ministry of ecology and sustainable development), the difficulties encountered during the start-up of the institute (conditions of creation, budget regulation), the debate about the fiscal deficiency (fiscal regime applied and resulting difficulties), and the perspectives of evolution of the institute. The comments made by the commission after the presentation of the report are summarized in a last part. (J.S.)

  1. Information report published in application of article 146 of the Regulation by the Commission of information related to the technical and financial feasibility of the dismantling of basic nuclear installations on the behalf of the Commission for sustainable development and land planning. Nr 4428

    International Nuclear Information System (INIS)

    Aubert, Julien; Romagnan, Barbara

    2017-01-01

    Based on visits, on hearings and on debates within the Commission, this report addresses the issue of the technical and financial feasibility of the dismantling of nuclear installations. Indeed, it appears that the technical feasibility is not as mastered as supposed, and that dismantling works will last longer than foreseen, with therefore a higher cost than foreseen. Thus, existing and foreseen funding might be insufficient, and the global strategy for dismantling should be seriously reviewed regarding both technical and financial points of view. Before reaching this conclusion, the report presents the general context: definition of dismantling, perspective of development of dismantling activities, specific case of marine reactors. The authors then present and comment initial basic principles (extrapolation with the Dampierre model, immediate dismantling, soil decontamination) and parameters which could result in cost reduction. The second part of the report discusses the technical issue, first by recalling and commenting the difficulties faced by EDF to dismantle its first reactors (case of Brennilis, complete shift by EDF regarding its strategy for graphite-gas reactors, case of Superphenix), secondly by outlining that waste management largely determines dismantling (situation for the different types of wastes, problem of saturation of some centres, issue of a release threshold, case of wastes from graphite-gas reactors), and thirdly by discussing the issue of subcontracting. The third part addresses the financial issue and EDF funding by discussing assessment principles and method used by EDF, by showing that the result is probably an under-assessment (due to optimistic hypotheses, to many unfunded expenses, and to under-assessed dismantling costs). The authors then compare the French situation with other countries (Germany, USA, Belgium, OECD countries) to show that institutional comparisons are consistent with each other. They propose a more detailed

  2. Intestinal Parasites among Waste-Handlers in Jos Metropolitan Area ...

    African Journals Online (AJOL)

    Intestinal Parasites among Waste-Handlers in Jos Metropolitan Area of Plateau State, Nigeria. ... Solid waste management is associated with health hazards. ... Waste disposal workers are at high risk of infection with different species of ...

  3. Towards a Metropolitan Fundamental Diagram Using Travel Survey Data

    Science.gov (United States)

    2016-01-01

    Using travel diary data from 2000–2001 and 2010–2012 this research examines fundamental traffic relationships at the metropolitan level. The results of this paper can help to explain the causes of some traffic phenomena. Network average speed by time of day can be explained by trip length and cumulative number of vehicles on the road. A clockwise hysteresis loop is found in the Metropolitan Fundamental Diagram in the morning period and a reverse process happens in the afternoon. PMID:26866913

  4. Haphazard commercialization: a potential threat to sustainable commercial development in metropolitan cities? The case of Lahore

    International Nuclear Information System (INIS)

    Nadeem, O.; Hameed, R.

    2005-01-01

    The demand of urban space for commercial development due to unprecedented population growth has surpassed the planned supply delivered by planning agencies in metropolitan cities of Pakistan. As a corollary to that, conversion of residential land use into various types of commercial activities has sprung up particularly along major roads of planned residential areas and arterial roads of cities. These conversions have proceeded, both with and without official consent, largely in a haphazard manner without following a coherent strategy. This has resulted in acute parking problems, reduction in traffic capacity of roads and resultant increase in congestion, energy use, air and noise pollution, and burden on utility services. Permitting conversion of land use in a haphazard manner seems not only a departure from planning principles but also jeopardizing the spatial structure of cities causing serious environmental repercussions. This paper presents evidence to the above observations through a detailed study of the environmental impact of commercial development in Lahore. The study is based on detailed land use, socio-economic, traffic, and parking surveys in carefully selected sample of three major housing schemes variously located in Lahore. The paper argues that weak development control, out-dated master plan, and inappropriate commercialization policies of the Government have lead to unsustainable pattern of commercial development even in planned residential areas. The findings of the study call for formulation of environmentally friendly commercialization policy. This will also involve redefining basic land use allocation standards and improvements in the design considerations so as to promote sustainable development of commercial areas in metropolitan cities. (author)

  5. Understanding metropolitan patterns of daily encounters.

    Science.gov (United States)

    Sun, Lijun; Axhausen, Kay W; Lee, Der-Horng; Huang, Xianfeng

    2013-08-20

    Understanding of the mechanisms driving our daily face-to-face encounters is still limited; the field lacks large-scale datasets describing both individual behaviors and their collective interactions. However, here, with the help of travel smart card data, we uncover such encounter mechanisms and structures by constructing a time-resolved in-vehicle social encounter network on public buses in a city (about 5 million residents). Using a population scale dataset, we find physical encounters display reproducible temporal patterns, indicating that repeated encounters are regular and identical. On an individual scale, we find that collective regularities dominate distinct encounters' bounded nature. An individual's encounter capability is rooted in his/her daily behavioral regularity, explaining the emergence of "familiar strangers" in daily life. Strikingly, we find individuals with repeated encounters are not grouped into small communities, but become strongly connected over time, resulting in a large, but imperceptible, small-world contact network or "structure of co-presence" across the whole metropolitan area. Revealing the encounter pattern and identifying this large-scale contact network are crucial to understanding the dynamics in patterns of social acquaintances, collective human behaviors, and--particularly--disclosing the impact of human behavior on various diffusion/spreading processes.

  6. Initiatives towards Carbon Neutrality in the Helsinki Metropolitan Area

    Directory of Open Access Journals (Sweden)

    Karna Dahal

    2016-07-01

    Full Text Available Carbon neutrality represents one climate strategy adopted by many cities, including the city of Helsinki and the Helsinki metropolitan area in Finland. This study examines initiatives adopted by the Helsinki metropolitan area aimed at reducing energy-related carbon emissions and achieving carbon neutrality through future actions. Various sectorial energy consumption rates per year and carbon emissions from various sectors within the city of Helsinki and the metropolitan area were extracted from an online database and re-calculated (in GWh, MWh/inhabitant and MtCO2e, KtCO2e/inhabitant. We employed a backcasting scenario method to explore the various carbon reduction measures in the Helsinki metropolitan area. About 96% of the emissions produced in the Helsinki metropolitan area are energy-based. District heating represents the primary source of emissions, followed by transportation and electricity consumption, respectively. We also found that accomplishing the carbon reduction strategies of the Helsinki metropolitan area by 2050 remains challenging. Technological advancement for clean and renewable energy sources, smart policies and raising awareness resulting in behavioral changes greatly affect carbon reduction actions. Thus, strong political commitments are also required to formulate and implement stringent climate actions.

  7. The G8 summit of Gleneagles (July 6-8, 2005) - the energy-climate action plan - the France-Algeria cooperation. The works of the national commission of the public debate about energy - the management of nuclear wastes - the EPR at Flamanville - the Cotentin-Maine VHV line. The oil prices surge during summer 2005, national and international reactions

    International Nuclear Information System (INIS)

    Lamy, J.; Locufier, A.; Vincent, C.; Bros, Th.; Delmestre, N.; Noilban, F.; Quintaine, Th.; Perrin, J.L.; Branche, Th.; Barthe, F.

    2006-01-01

    This issue of Energies et matieres premieres newsletter comprises five articles dealing with: 1 - the energy-climate action plan adopted by the presidents of the 8 more industrialized countries of the world (G8) during the Gleneagles summit (Scotland) in July 6-8, 2005. This action plan was discussed in association with five emerging countries, among the biggest energy consumers in the world; 2 - the works carried out by the national commission of the public debate on energy about the management of radioactive wastes. The article recalls the 3 axes of research (separation-transmutation, underground disposal and surface or sub-surface storage) and the planning of the preparation of the future project of radioactive management law which will be examined by the European parliament during the second quarter of 2006; 3 - the public debate about the setting up of the European pressurized reactor (EPR) at Flamanville (Cotentin, France); 4 - the public debate about the project of very-high voltage power line between Flamanville and Maine region for the reinforcement of the regional power grid; and 5 - the national and international reactions in front of the surge of oil prices during summer 2005. (J.S.)

  8. Envisioning a metropolitan foodshed: potential environmental consequences of increasing food-crop production around Chicago

    Science.gov (United States)

    Bowen, E. E.; Martin, P. A.; Schuble, T. J.

    2009-12-01

    Nationwide, cities are increasingly developing policies aimed at greater sustainability, particularly focusing on reducing environmental impact. Such policies commonly emphasize more efficiently using energy to decrease the greenhouse gas (GHG) footprint of the city. However, most plans ignore the food system as a factor in regional energy use and GHG emissions. Yet, the food system in the United States accounts for ~20% of per capita greenhouse gas emissions. Local, sustainable food production is cited as one strategy for mitigating GHG emissions of large metropolitan areas. “Sustainable” for regional agriculture is often identified as small-scale, diversified food crop production using best practices management. Localized food production (termed “foodshed”) using sustainable agriculture could mitigate climate change in multiple ways: (1) energy and therefore CO2-intensive portions of the conventional food system might be replaced by local, lower-input food production resulting in carbon offsets; (2) increased regional carbon storage might result from well-managed food crop production vs. commodity crop production; and (3) averted N2O emissions might result from closing nutrient cycles on agricultural lands following changes in management practices. The broader implications for environmental impact of widespread conversion to sustainable food crop agriculture, however, remain largely unknown. We examine the Chicago metropolitan region to quantify the impact of increased local food production on regional energy efficiency and GHG emissions. Geospatial analysis is used to quantify the resource potential for establishing a Chicago metropolitan foodshed. A regional foodshed is defined by minimizing cost through transportation mode (road, rail, or water) and maximizing the production potential of different soil types. Simple biogeochemical modeling is used to predict changes in N2O emissions and nutrient flows following changes in land management practices

  9. Opinion on the behalf of the Sustainable Development and Land Planning Commission on the Finance bill for 2011 (n. 2824), volume 7: research and university education, research in the fields of sustainable development

    International Nuclear Information System (INIS)

    2010-01-01

    While presenting two programmes which respectively concern the management of surroundings and resources, and the fields of energy and of sustainable development and land planning, and commenting their financial means, their objectives and performance indicators, this report shows that these programmes are facing insufficient grants. Then, it shows that the different public operators (research laboratories, centres and institutions, public agencies) are weakened by decreasing allocations. Three examples are then studied to show the difficulties of these institutions which have to perform fundamental missions with limited means: IFREMER (in the case of oyster control), INRA (for the development of the biotechnology sector) and IRSN (for the safety of nuclear waste storage)

  10. 77 FR 43488 - Continuity of Operations Plan

    Science.gov (United States)

    2012-07-25

    ...; Order No. 765] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION... Operations Plan to allow the Commission the discretion to better address not only long-term and catastrophic... discretion regarding: the activation and deactivation of the Continuity of Operations Plan and any suspension...

  11. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  12. Commission Conditions d'emploi

    CERN Multimedia

    Staff Association

    2017-01-01

    Au CERN, nous avons la formidable possibilité d’imaginer nos CONDITIONS D’EMPLOIS. Rendez-vous compte ! Nous avons le pouvoir de proposer des idées et de les défendre pour avoir des conditions d’emplois qui soient les plus attractives possibles pour le personnel en place et à venir. ---------------- L’Association du personnel du CERN, tout le monde connait ou en a entendu parler. Ce qui est moins connu, ce sont les diverses commissions internes qui traitent des sujets propres à défendre les intérêts du personnel. Les publications dans notre journal, l’Echo, sont un des moyens à notre disposition pour vous faire découvrir chacune des commissions internes de l’Association du personnel (voir Echo n°242 sur la commission juridique, et Echo n°255 sur la commission des cas particuliers). Commission Conditions d&...

  13. National Bioethics Commissions as Educators.

    Science.gov (United States)

    Lee, Lisa M

    2017-05-01

    As has become tradition, executive directors of United States' presidential bioethics committees offer reflections about their experience shortly after the orderly shutdown of the commission staff. After the records are filed according to government records regulations; after all the staff members, who are hired into temporary positions that must be renewed every two years, have secured permanent employment; after preparations are made to ensure that the next commission staff (should there be one) has a budget and standard operating procedures in order to begin its work in a timely manner; after the lights are turned out for the last time, the executive director makes the final climb up the stairs into the sunlight and reflects on the whirlwind. There is much about my work with the Presidential Commission for the Study of Bioethical Issues that deserves comment, but one aspect of the commission that has been especially valuable to me is its work to educate the nation on bioethical issues. This is, moreover, a contribution in which the commission staff was central, and it is one that, as an ethics educator myself, I will cherish deeply. © 2017 The Hastings Center.

  14. Designing Freshwater Resilience for the Mexico City Metropolitan Area

    Science.gov (United States)

    Freeman, S.; Wi, S.; Brown, C.

    2017-12-01

    There are few places in the world where the water management challenges associated with global urbanization are as fully visible as in the Greater Mexico City Metropolitan Area (MCMA). MCMA has a population of 22 million of which only 82% have daily water provision and this figure is projected by local agencies to decrease drastically in the next decade due to population growth, infrastructure degradation and climate change. The city is served by a massive water delivery system, consisting of complex network of infrastructure in the surrounding basins that provides about 40% of the supply for MCMA and is characterized by increasing land use change and competition for water. The remaining 60% of MCMA's water is sourced internally from already depleted groundwater resources whose exploitation also results in significant subsidence throughout the city, further damaging already degraded infrastructure. Consequently, there is interest and need for investments that improve the performance of the freshwater delivery system, including local resources and connected basins, in the face of change and shocks that can be only partially anticipated. The quest for such resilience is a common theme in urban infrastructure design yet practical approaches for achieving it remain nascent. In this study, we use MCMA and the Cutzamala Water supply system to demonstrate a quantitative framework to evaluate investment strategies which seek resilience for the water supply system of MCMA. Multiobjective optimization and decisions under deep uncertainty approaches are used to evaluate the best performing investment portfolios across different resilience performance metrics which encompass social equity, environmental and economic objectives. This analysis shows dynamic system responses that result from different investment portfolios, elucidating difficult planning and management decisions around tradeoffs between allocations as well as performance metrics (e.g short period of total failure

  15. Internal audit risk management in metropolitan municipalities

    Directory of Open Access Journals (Sweden)

    Christo Ackermann

    2016-07-01

    Full Text Available Internal audit functions (IAFs of organisations are regarded as crucial components of the combined assurance model, alongside the audit committee, management and external auditors. The combined assurance model aims at having integrated and aligned assurance in organisations with the overall aim of maximising risk and governance oversight and control efficiencies. In this regard, internal audit plays a crucial role, insofar as it consists of experts in risk, governance and control consultancy who provide assurance to senior management and the audit committee. Audit committees are dependent on internal audit for information and their effectiveness revolves around a strong and well-resourced internal audit function which is able to aid audit committees to meet their oversight responsibilities. There is thus a growing demand for managing risk through the process of risk management and internal audit is in a perfect position to assist with the improvement of such processes. If internal auditors wish to continue being an important aspect of the combined assurance model, they need to address the critical area, amongst others, of risk management as part of their work. If not, it follows that the board, audit committees and other levels of management will remain uninformed on the status of these matters which, in turn, will negatively impact the ability of these stakeholders to discharge their responsibilities. This study therefore focuses on analysing the functioning of IAFs, with specific reference to their risk management mandate. The study followed a mixed method approach to describe internal audits risk management functioning in the big eight metropolitan municipalities in South Africa. The results show that internal audit provide a broad scope of risk management work which assist senior management in the discharge of their responsibilities. However, in the public eye, internal audits risk management functioning is scant

  16. Smart Policies and Metropolitan Vision: the Spatial Dimension in the Experience of Amsterdam Smart City Platform

    Directory of Open Access Journals (Sweden)

    Giulia Fini

    2014-11-01

    Full Text Available The paper aims at presenting the main projects and policies recently developed by the Municipality of Amsterdam in the field of energy policies, with particular reference to the projects promoted in the context of the ASC - Amsterdam Smart City Platform. The analyzed projects and policies seem to be relevant for at least three aspects and for the matters raised by them:I. for the aim to connect policies and projects of the Amsterdam Smart City with the definition of a territorial vision for the Amsterdam metropolitan area;II. for the strong connection characterizing this experience between energy-management policies on the territory and the management’s choices related to urban planning and urban design;III. finally, the experience is relevant in relation with the consolidation of the ACS’s platform as a place where several individuals are directly involved in the management of public good and where all requests and peculiarities contribute to defining a common planning process on the energy and environmental subjects in the urban and metropolitan area.  Based on the latest, most significant information of the activities performed by Amsterdam Smart City Platform, the paper focuses on the results after four years since the projects and tests have been carried out, on the basis of a network structuring, predetermined energy-saving targets and of some space-related choices regarding the whole territory as well as ASC’s policies.

  17. Forest Fires in the Metropolitan District of Quito (DMQ: Risk knowledge and public intervention

    Directory of Open Access Journals (Sweden)

    Jairo Estacio

    2013-10-01

    Full Text Available Every summer, the Metropolitan District of Quito (MDQ is subject to the recurrence of forest fires with different consequences in terms of loss of protected areas of great biodiversity, affectation of public and private spaces of different use and impact on the population well-being. The management of municipal authorities of this type of risks is still limited, since there is no decisional tool that can improve the preventive planning and the response to the annual presence of these events. For this reason, the generation of a study on potential fores fires represents the first step towards the comprehension and the reduction of risks. The present article presents the result of this study, the mechanisms and the efforts of the municipal technicians that made possible the achievement of these tools in the frame of the Risk Reduction Program of the Metropolitan District of Quito. The obtained results allowed the implementation of prevention actions in areas with very valuable ecosystems services but fragile in the same time, as well as the improvement of the fire emergency plans in order to optimize resources and reinforce local capacities. 

  18. Dynamics of Metropolitan Landscapes and Daily Mobility Flows in the Italian Context. An Analysis Based on the Theory of Graphs

    Directory of Open Access Journals (Sweden)

    Amedeo Ganciu

    2018-02-01

    Full Text Available The distribution of services across a territory generates daily commuting flows, which have a significant influence on the development of the territory and often causes congestion in large areas. This negatively affects the environmental, economic and social components of the metropolitan landscape. Using the graph theory, we constructed and analyzed various (in typologies of transportation and moving time flow networks in the two main Italian metropolitan areas: Rome (MCR and Milan (MCM. The analysis of these networks provided us with strategic information on the dynamics of the two urban macro-systems. In particular, the aim of our study was to: (i identify the characteristics, distribution and direction of the main attractive forces within the regional systems under study; (ii identify the main differences in size and structure of commuter networks between the two metropolitan areas and between the two regional systems that include the two mother cities; and, (iii identify the main differences in the size and structure of the two commuting networks by transport modes (private, public, non-motorized mobility and the travel time. The results highlighted significant differences between the two case studies regarding volume flows, complexity and structure networks, and the spatial extension of the territories that are governed by the two metropolitan areas. MCR is a strongly monocentric urban system with a regional influence centred on the mother city of Rome, while MCM is a diffused polycentric regional metropolitan system centred on multiple mother cities. The findings many have a role in urban planning choices and in the evaluation of policies aimed to favor sustainable mobility.

  19. Opinion presented on the behalf of the Commission for Sustainable Development and Land Planning on the 2015 on the finance bill project for 2015 (nr 2234), Volume I - Ecology, sustainable development and mobility, risk prevention - Meteorology - Nr 2266

    International Nuclear Information System (INIS)

    Krabal, Jacques

    2014-01-01

    The first part of this report discusses the credits asked for 2015 for the 'Risk prevention' program (program nr 181) in different areas: prevention and struggle in the field of natural and hydraulic risks (fund for the prevention of major natural risks, prevention of flooding and safety of dams and dikes), prevention and struggle in the field of technological risks (prevention plans, nuclear safety and radiation protection), public health and environment policies (evolution of the PNSE, struggle against noise, waste management). The second part discusses the credits asked for 2015 for the 'Meteorology' program: program structure and asked credits, position of the market of meteorological information services, implementation of the contract for objectives and performance and achievement of a denser territorial coverage

  20. Commissioning of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(CDS)2069446

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focusing on simultaneous running and combined track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  1. Surrogacy commissioning fathers and HIV

    OpenAIRE

    Jordaan, D W

    2014-01-01

    Surrogacy is not regulated by a single legal instrument only, nor is confirmation of a surrogacy agreement by the High Court an unqualified green light for the surrogacy process to proceed. In the context of the HIV status of the commissioning father, whose gametes are to be used for the conception of the child in pursuance of a surrogacy agreement, the intended in vitro fertilisation of the surrogate mother may only take place on condition that the commissioning father, and his semen, have b...

  2. 47 CFR 1.1528 - Commission review.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission review. 1.1528 Section 1.1528... Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on its own initiative, in...

  3. Continuity and enhancement of quality management during commissioning of W7-X

    Energy Technology Data Exchange (ETDEWEB)

    Vilbrandt, Reinhard, E-mail: reinhard.vilbrandt@ipp.mpg.de; Bosch, Hans-Stephan; Feist, Jost-Henrich; Klinger, Thomas

    2015-10-15

    Highlights: • Commissioning follows the W7-X structure into appropriate components, subsystems and systems. • Local and integrated commissioning steps are carried out alternately. • An exact and detailed preparation of all commissioning is absolutely necessary. • Templates support instruction manuals, safety analyses, and commissioning instructions. • Because of safety special attention must be paid to the first putting into service. - Abstract: The commissioning of Wendelstein 7-X, the first numerically optimized stellarator, is a new phase in the project. The general planning and execution of the commissioning of the entire W7-X system follow its structure into appropriate components, subsystems and systems. The approach for taking these systems into operation will lead to so-called local commissioning which is usually executed for individual systems in connection with the necessary peripheral devices and auxiliary systems. The subsequent step-wise testing and commissioning of the systems in connection with the central device of W7-X, including the central safety control, and the central data acquisition system is performed in the second step, the so-called integrated commissioning. This leads directly to the preparation of first plasma operation. New organizational and quality management elements have been added to the running system, or existing, proven tools have been modified. The major new organizational structures and tasks and the quality planning and assurance tools are described in more detail. The experience during the first commissioning steps of the vacuum and cryogenic systems is outlined.

  4. LHC Commissioning and First Operation

    OpenAIRE

    Myers, S

    2010-01-01

    A description is given of the repair of the LHC after the accident of September 2008. The LHC hardware and beam commissioning and initial operation are reviewed both in terms of beam and hardware performance. The implemented machine protection measures and their impact on LHC operation are presented.

  5. Commissioning Leibstadt nuclear power plant

    International Nuclear Information System (INIS)

    Roeder, A.; Degen, R.; Nedelko, U.

    1985-01-01

    This paper describes the experience and benefits obtained from the use of temporary oil fired boilers of sufficient capacity to allow commissioning and no-load tests to be carried out on the turbine-generator months ahead of steam being available from the NSSS. The successful result at Leibstadt may be a model for other plants

  6. 77 FR 5528 - National Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-02-03

    ... and work plan, and reviewing past trust reform and FACA committee efforts. A final agenda will be... DEPARTMENT OF THE INTERIOR Office of the Secretary National Commission on Indian Trust... Office of the Secretary is announcing that the National Commission on Indian Trust Administration and...

  7. 77 FR 69614 - Commission Information Collection Activities (FERC-714); Comment Request

    Science.gov (United States)

    2012-11-20

    ... planning areas with annual peak demand over 200 MW. Estimate of Annual Burden: \\1\\ The Commission estimates... submitting the information collection FERC-714 (Annual Electric Balancing Authority Area and Planning Area... Electric Balancing Authority Area and Planning Area Report. OMB Control No.: 1902-0140. Type of Request...

  8. Commissioning of specialist palliative care services in England.

    Science.gov (United States)

    Lancaster, Harriet; Finlay, Ilora; Downman, Maxwell; Dumas, James

    2018-03-01

    Some failures in end-of-life care have been attributed to inconsistent provision of palliative care across England. We aimed to explore the variation in commissioning of services by Clinical Commissioning Groups (CCGs) using a data collection exercise. We sent a Freedom of Information request in the form of an open questionnaire to all 209 CCGs in England to assess their commissioning of palliative and end-of-life care services, mainly focused on the provision of specialist palliative care services. 29 CCGs provided information about the number of patients with some form of palliative care needs in their population. For specialist palliative care services, CCGs allocated budgets ranging from £51.83 to £2329.19 per patient per annum. 163 CCGs (77.90%) currently commission 7-day admission to their specialist palliative care beds. 82.84% of CCGs commission 7-day specialist palliative care services in patients' own homes and out-of-hours services rely heavily on hospice provision. 64 CCGs (31.37%) commission pain control teams, the majority of whom only operate in regular working hours. 68.14% of CCGs reported commissioning palliative care education of any sort for healthcare professionals and 44.85% of CCGs had no plans to update or review their palliative care services. The most important finding from this exercise is that the information CCGs hold about their population and services is not standardised. However, information based on data that are more objective, for example, population and total budget for palliative care, demonstrate wide variations in commissioning. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  9. State Energy Commission of Western Australia. 1985 annual report

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The report reviews the operations and achievements of the Commission during 1984/85, and also outlines plans aimed at providing reliable and cost-effective energy supplies in Western Australia in the future. The Commission completed the 1984/85 financial year with an operating surplus of 4.3 m dollars. This compared with a surplus of 4.4 m dollars for the previous year. A full set of financial statements, certified by the Auditor General of Western Australia as being properly drawn up and fairly presented, appears in the back of the report.

  10. President's Commission and the normal accident

    International Nuclear Information System (INIS)

    Perrow, C.

    1982-01-01

    This chapter incorporates the major points of an analysis of the accident at Three Mile Island that I prepared in September 1979. In contrast to the findings of the President's Commission (1979), I did not view the accident as the result of operator error, an inept utility, or a negligent Nuclear Regulatory Commission but as a consequence of the complexity and interdependence that characterize the system itself. I argued that the accident was inevitable-that is, that it could not have been prevented, foreseen, or quickly terminated, because it was incomprehensible. It resembled other accidents in nuclear plants and in other high risk, complex and highly interdependent operator-machine systems; none of the accidents were caused by management or operator ineptness or by poor government regulation, though these characteristics existed and should have been expected. I maintained that the accident was normal, because in complex systems there are bound to be multiple faults that cannot be avoided by planning and that operators cannot immediately comprehend

  11. Local materials in the regeneration of urban space of the historic centre of the Metropolitan City of Naples

    Directory of Open Access Journals (Sweden)

    Paola De Joanna

    2015-11-01

    Full Text Available The contribution is part of the studies conducted by the Urban Planning Board, Land Management, Environment Laboratory for the “metropolitan city” and the Big Project “Historic centre of Naples, enhancement of the UNESCO site”. Among the issues under discussion, very important for the 92 municipalities of the Metropolitan City, is the preservation of different urban identities which, although united administratively, are claiming their own cultural profile rooted in the urban space, in the architecture of places and in local resources. The work is based on the principle that the use of local resources affects the quality and perception of urban space and, as evidence of belonging to the place, it is necessary to deal its exploitation under sustainable auspices.

  12. QPS Upgrade and Re-commissioning

    CERN Document Server

    Denz, R

    2009-01-01

    Prior to the re-start of the Large Hadron Collider LHC in 2009 the protection system for superconducting devices QPS will be submitted to a substantial upgrade. The foreseen modifications will enhance the capability of the system in detecting problems related to the electrical interconnections between superconducting magnets as well as the detection of so-called aperture symmetric quenches in the LHC main magnets. The presentation will describe the design and implementation of the new protection layers and report on recent tests with prototype devices. It will address as well the planned steps for commissioning of the new system, possible limitations and the additional tools and procedures required to make use of its full capability. Finally the recent progress with respect to procurement, production, test and installation will be presented.

  13. ARIEL e-LINAC: Commissioning and Development

    Science.gov (United States)

    Laxdal, R. E.; Zvyagintsev, V.

    2016-09-01

    A superconducting electron Linac (e-Linac) will be a part of the ARIEL facility for the production of radioactive ion beams (RIB) at TRIUMF. The e-Linac will consist of five 1.3GHz 9-cell cavities in three cryomodules delivering a 50MeV 10mA beam. The baseline operation will be single pass but a re-circulating ring is planned to allow either energy boost or energy recovery operation. The first stage of the accelerator which consists of two cryomodules has been successfully commissioned in 2014. The paper will discuss the superconducting radio-frequency (SRF) challenges of the accelerator. Cavities, crymodules and RF system design, preparation, and performance will be presented.

  14. ARIEL e-LINAC: Commissioning and Development

    International Nuclear Information System (INIS)

    Laxdal, R.E.; Zvyagintsev, V.

    2016-01-01

    A superconducting electron Linac (e-Linac) will be a part of the ARIEL facility for the production of radioactive ion beams (RIB) at TRIUMF. The e-Linac will consist of five 1.3GHz 9-cell cavities in three cryomodules delivering a 50MeV 10mA beam. The baseline operation will be single pass but a re-circulating ring is planned to allow either energy boost or energy recovery operation. The first stage of the accelerator which consists of two cryomodules has been successfully commissioned in 2014. The paper will discuss the superconducting radio-frequency (SRF) challenges of the accelerator. Cavities, crymodules and RF system design, preparation, and performance will be presented. (paper)

  15. The design of gated communities in São Paulo metropolitan area

    Directory of Open Access Journals (Sweden)

    João Rett Lemos

    2007-06-01

    Full Text Available This paper has as study object the formation of a kind of residential urban landscape spread in a large number of Brazilian cities, in special those around the Sao Paulo metropolitan area: the gated communities destined to a population with average and high income. The premise that it deals with a type of appropriation of urban ground related since the middle of the 1970‘s when internal adjustments in real estate market were implemented, and to the standards of growth of the São Paulo metropolitan area, specifically its process of dispersion, excites the necessity of identify the characteristics and specially the effects to the rest of the urban space that are been spread in terms never seen. Twenty eight enterprises launched between 1994 and 2005 in the metropolitan area are analyzed. The set of case studies involves from communities settled in the rural zones to the urban areas; in common is the fact that are enterprises created by a private entrepreneur to subdivide an only one private property, and the management of the internal space by proper codes. The analysis was developed in two scales: at a first moment, it was restricted in the internal spaces, appointing the planning methods and the distribution standards of the open areas, the volumetric occupations, and the leisure equipments; in the following one, were analyzed the neighbor landscape, identifying the main characteristics of the fabric urban and the not constructed natural environment.

  16. First epidemiological report of feline heartworm infection in the Barcelona metropolitan area (Spain).

    Science.gov (United States)

    Montoya-Alonso, José Alberto; Carretón, Elena; García-Guasch, Laín; Expósito, Jordi; Armario, Belén; Morchón, Rodrigo; Simón, Fernando

    2014-11-12

    The metropolitan area of Barcelona is the most densely populated metropolitan area on the Mediterranean coast. Several studies have reported the presence of canine heartworm disease in this region; however, there are no published epidemiological data regarding feline heartworm in this region and the prevalence in this species remains unknown. Serum samples from 758 cats living in the metropolitan area of Barcelona (Spain) were collected between 2012 and 2013. To establish the seroprevalence of heartworm infection in cats, serological techniques for anti-D.immitis and anti-Wolbachia antibody detection were used while a commercial ELISA test kit was used to detect circulating D.immitis antigens. Of these samples, 11.47% were positive to D.immitis and Wolbachia surface protein antibodies and 0.26% were positive to D.immitis antigens. The higher antibody seroprevalences were found in the areas that follow the courses of the rivers Llobregat and Anoia (Baix Llobregat 11.5%, Vallés Occidental 13.2%; Barcelonés 11.7%) where humidity and vegetation favour the development of the mosquito vectors. High antibody seroprevalences were also found in the urban areas (Barcelona city 13.1%; Sabadell 15.5%), which demonstrates that city cats are also at risk from D.immitis infection. Generally, in Spain cats do not receive prophylactic treatment and therefore the risk of infection is higher in this species than in dogs. Adequate prophylactic plans should be implemented in the feline population. This is the first epidemiologic study on feline heartworm infection to be carried out in continental Spain.

  17. No 2868. Report made on behalf of the commission of finances, general economy and plan about the proposal of resolution (no 2790) from M. Alain Bocquet aiming at creating an inquiry commission about the conditions of bringing out of EDF's shares, about the opening of its capital to the financial market, about the recourse to forced shareholders and about the consequences of this situation in the realization of its public utility missions

    International Nuclear Information System (INIS)

    2006-02-01

    The creation of an inquiry commission was requested by part of the house of commons in order to analyze the conditions of Electricite de France (EDF) privatization and in particular some discreditable means that might have been implemented by banks, by the direction of EDF and by the public authorities to accelerate the privatization of the national electric utility and to make it a success. The aim of this report is to analyze the admissibility of this request before launching the creation of an inquiry commission. It stresses on the impreciseness of the fraud charges, on the success of EDF's capital increase and concludes on the unsuitability of an inquiry commission to supply answers to these charges. (J.S.)

  18. Voluntary Community Organisations in Metropolitan Development

    DEFF Research Database (Denmark)

    Larsen, Jacob Norvig

    that voluntary community work in relation to public urban regeneration is much more than the public’s engagement in project planning processes. Contrary to temporary urban regeneration projects, VCOs are much more permanently embedded in the neighbourhood, and volunteers are motivated by both self-interest...

  19. British Columbia Utilities Commission 2001 annual report

    International Nuclear Information System (INIS)

    2002-06-01

    The main responsibility of the British Columbia Utilities Commission is to regulate energy utilities under its jurisdiction to ensure that energy rates are fair and that utility operators in the province provide safe, adequate and secure service to their customers. The Commission also approves the construction of new facilities planned by utilities. It also participates in the review of utility and energy projects under the Environmental Assessment Act. Several successes were achieved in 2001 as the utility implemented its first performance plan. Oral public hearings were held for applications by Pacific Northern Gas and by Pembina Pipelines, owners of the common carrier oil pipeline from Taylor to Kamloops. A review of BC Gas' rate design to apportion utility revenue requirements fairly to different classes of customers was successfully achieved by a negotiated settlement process. In 2001, there was also a high level of proposed mergers, acquisitions and divestitures. Duke Energy Corporation's share acquisition of Westcoast Energy's two affiliated gas utilities was approved. BC Gas' application to divest its customer care activities to a joint venture company with Enbridge was also reviewed, and an oral hearing was held to review a West Kootenay Power application to sell its Kootenay River hydroelectric generation assets to Columbia Basin Trust and the Columbia Power Corp. In this case, the decision rendered was that the sale terms had to be changed so that customers could share the proceeds. The utility therefore, decided not to proceed with the sale under these conditions. The BC Hydro legislated rate freeze, which was due to expire on September 30, 2001, was extended for an additional 18 months to allow the new provincial government time to implement a new energy policy. The new energy policy is expected to give the province an energy advantage by facilitating growth and diversification in energy production while providing competition and more choice for

  20. The food environment and adult obesity in US metropolitan areas.

    Science.gov (United States)

    Michimi, Akihiko; Wimberly, Michael C

    2015-11-26

    This research examines the larger-scale associations between obesity and food environments in metropolitan areas in the United States (US). The US Census County Business Patterns dataset for 2011 was used to construct various indices of food environments for selected metropolitan areas. The numbers of employees engaged in supermarkets, convenience stores, full service restaurants, fast food restaurants, and snack/coffee shops were standardised using the location quotients, and factor analysis was used to produce two uncorrelated factors measuring food environments. Data on obesity were obtained from the 2011 Behavioral Risk Factor Surveillance System. Individual level obesity measures were linked to the metropolitan area level food environment factors. Models were fitted using generalised estimating equations to control for metropolitan area level intra-correlation and individual level sociodemographic characteristics. It was found that adults residing in cities with a large share of supermarket and full-service restaurant workers were less likely to be obese, while adults residing in cities with a large share of convenience store and fast food restaurant workers were more likely to be obese. Supermarkets and full-service restaurant workers are concentrated in the Northeast and West of the US, where obesity prevalence is relatively lower, while convenience stores and fast-food restaurant workers are concentrated in the South and Midwest, where obesity prevalence is relatively higher. The food environment landscapes measured at the metropolitan area level explain the continental-scale patterns of obesity prevalence. The types of food that are readily available and widely served may translate into obesity disparities across metropolitan areas.

  1. Printing activity of the Metropolitan Gavriil Banulescu Bodoni

    Directory of Open Access Journals (Sweden)

    Nicolae Fustei

    2013-07-01

    Full Text Available The present study is dedicated to the printing activity of the Metropolitan Gavriil Bănulescu-Bodoni’s activity. The religious and secular prints made from Chisinau’s Diocesan typography by Metropolitan Gavriil promote the idea of national unity of people from Moldavia, Wallachia and Transylvania. Due to the new documents from archives, more evidences and „more light” are being spread over the activity of famous hierarch, whose life is linked with the history of culture of three nations – Romanians, Ukrainians and Russians.

  2. Off-site emergency preparedness activities within the European Commission

    International Nuclear Information System (INIS)

    Kelly, G.N.

    1998-01-01

    Increasing attention is being given by the European Commission to off-site emergency preparedness as part of its broader contribution to improving nuclear safety in Eastern Europe. The main initiatives being taken or planned by the Commission in this area are summarised. Particular attention is given to two topics: Firstly, the development of the RODOS (Real-time On-line DecisiOn Support) system for supporting off-site emergency management in the event of a nuclear accident; and, secondly, the work of an Inter-Service Group on nuclear Off-Site Emergency Preparedness (OSEP) in Eastern Europe that has been established within the Commission. The contribution that each is making to improving emergency preparedness, both in Eastern Europe and in Europe more widely, is described. (orig.)

  3. European commission contribution to improving off-site emergency preparedness

    International Nuclear Information System (INIS)

    Kelly, G.N.

    1996-01-01

    Increasing attention is being given by the European Commission to off-site emergency preparedness as part of its broader contribution to improving nuclear safety in Eastern Europe. The main initiatives being taken or planned by the Commission in this area are summarized. Particular attention is given to two topics: firstly, the development of the RODOS (Real-time On-line Decision Support) system for supporting off-site emergency management in the event of a nuclear accident; and, secondly, the work of an Inter-Service Group on nuclear Off-Site Emergency Preparedness (OSEP) in Eastern Europe that has recently been established within the Commission. The contribution that each is making to improving emergency preparedness, both in Eastern Europe and in Europe more widely, is described

  4. Division XII / Commission 41 / Working Group Historical Instruments

    Science.gov (United States)

    Pigatto, Luisa; Il-Seong, Nha; Hamel, Jürgen; Johnson, Kevin; Kochhar, Rajesh K.; Nakamura, Tsuko; Orchiston, Wayne; Pettersen, Bjørn R.; Schechner, Sara J.; Yunli, Shi

    The Historical Instruments Working Group (WG-HI) and Commission 41 started planning an interdisciplinary conference titled Astronomy and its instruments before and after Galileo since January 2007. This conference, as an IYA2009 initiative, aims “to highlight mankind's path toward an improved knowledge of the sky using mathematical and mechanical tools as well as monuments and buildings, giving rise, in doing so, to scientific astronomy”. Commission 46 and Commission 55 also support this conference, to be held on the Isle of San Servolo, Venice (Italy), 27 September 3 October 2009. As a fact of history, it was in Venice that Galileo was advised and got material (glass) to make his telescope, and in Venice he presented an working instrument to Venetian Doge in August 1609. The conference is co-sponsored by IAU as a Joint Symposium with the INAF Astronomical Observatory of Padova, Italy.

  5. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  6. Tracking the deployment of the integrated metropolitan ITS infrastructure in Orlando : FY99 results

    Science.gov (United States)

    2000-01-01

    In January 1996, Secretary Pea set a goal of deploying the integrated metropolitan Intelligent Transportation System (ITS) infrastructure in 75 of the nations largest metropolitan areas by 2006. In 1997, the U.S. Department of Transportation ini...

  7. Guidance on future art commissioning.

    Science.gov (United States)

    2009-05-01

    Delegates at Building Better Healthcare's recent "National Patient Environment and the Arts Conference 2009" in London heard how national public arts think tank ixia has appointed Bristol-based arts and wellbeing development agency Willis Newson to write "concise and convincing guidance" on commissioning art for new healthcare facilities. A key message, during a joint presentation, was that integrating artwork into hospitals and other healthcare premises requires the earliest possible consideration to reap the maximum rewards.

  8. 47 CFR 90.531 - Band plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Band plan. 90.531 Section 90.531...-805 MHz Bands § 90.531 Band plan. This section sets forth the band plan for the 763-775 MHz and 793... and portables subject to Commission-approved regional planning committee regional plans. Transmitter...

  9. Renewed growth in hospital inpatient cost since 1998: variation across metropolitan areas and leading clinical conditions.

    Science.gov (United States)

    Friedman, Bernard S; Wong, Herbert S; Steiner, Claudia A

    2006-03-01

    To use disaggregated data about metropolitan statistical areas (MSAs) and clinical conditions to better describe the variation in cost increases and explore some of the hypothesized influences. The study uses the state inpatient databases from the Healthcare Cost and Utilization Project, containing all discharges from hospitals in 172 MSAs in 1998 and 2001. The discharge summary information was combined with standardized hospital accounting files, surveys of managed care plans, MSA demographics, and state data pertaining to caps on medical malpractice awards. The analysis used descriptive comparisons and multivariate regressions of admission rate and cost per case in 9 leading disease categories across the MSAs. The increase in hospital input prices and changes in severity of illness were controlled. Metropolitan statistical areas with higher HMO market penetration continued to show lower admission rates, no less so in 2001 than in 1998. A cap on malpractice awards appeared to restrain admissions, but the net effect on hospital cost per adult eroded for those states with the most experience with award caps. Higher admission rates and increase in cost were found in several disease categories.

  10. 2009 Melbourne metropolitan sewerage strategy: a portfolio of decentralised and on-site concept designs.

    Science.gov (United States)

    Brown, V; Jackson, D W; Khalifé, M

    2010-01-01

    The bulk and retail water companies of the greater Melbourne area are developing the 2009 Metropolitan Sewerage Strategy to provide sustainable sewerage services to 2060. The objective of the strategy is to establish long term principles and near term actions to produce a robust sewage management system for Melbourne. Melbourne's existing sewerage system is largely centralised and discharges to two major treatment plants. Several small satellite treatment plants service local urban areas generally more distant from the centralised system. Decentralised and on-site wastewater systems are options for future sewage management and could play a role in local recycling. A portfolio of 18 on-site and decentralised concept designs was developed, applicable to the full range of urban development types in Melbourne. The concepts can be used in evaluation of metropolitan system configurations as part of future integrated water cycle planning. The options included secondary and tertiary treatment systems incorporating re-use of water for non potable uses, urine separation, black and greywater separation and composting toilets. On-site and cluster treatment systems were analysed. Each option is described by its indicative capital and operating costs, energy use and water and nutrient balances. This paper summarises and compares the portfolio mix of decentralized and on-site options in Melbourne's context.

  11. Fusion of multisource and multiscale remote sensing data for water availability assessment in a metropolitan region

    Science.gov (United States)

    Chang, N. B.; Yang, Y. J.; Daranpob, A.

    2009-09-01

    Recent extreme hydroclimatic events in the United States alone include, but are not limited to, the droughts in Maryland and the Chesapeake Bay area in 2001 through September 2002; Lake Mead in Las Vegas in 2000 through 2004; the Peace River and Lake Okeechobee in South Florida in 2006; and Lake Lanier in Atlanta, Georgia in 2007 that affected the water resources distribution in three states - Alabama, Florida and Georgia. This paper provides evidence from previous work and elaborates on the future perspectives that will collectively employ remote sensing and in-situ observations to support the implementation of the water availability assessment in a metropolitan region. Within the hydrological cycle, precipitation, soil moisture, and evapotranspiration can be monitored by using WSR-88D/NEXRAD data, RADARSAT-1 images, and GEOS images collectively to address the spatiotemporal variations of quantitative availability of waters whereas the MODIS images may be used to track down the qualitative availability of waters in terms of turbidity, Chlorophyll-a and other constitutes of concern. Tampa Bay in Florida was selected as a study site in this analysis, where the water supply infrastructure covers groundwater, desalination plant, and surface water at the same time. Research findings show that through the proper fusion of multi-source and multi-scale remote sensing data for water availability assessment in metropolitan region, a new insight of water infrastructure assessment can be gained to support sustainable planning region wide.

  12. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    The major progress made during the last months has been in the consolidation of services for the +endcaps and three barrel wheels (YB+2, YB+1 and YB0): all subdetectors have now final power connections (including Detector Safety protection), the gas systems have been commissioned for all gas detectors (the recirculation is not yet activated for the RPC though) and detector cooling has also been commissioned. Their integration with final services is the necessary condition for being able to operate larger fractions the detector. Recent weeks have seen full HCAL, more than 50% of EB and full wheels of DTs and CSC being operated using final services. This has not yet translated into major progress of global integration due to major interruptions of central services, which have not allowed the necessary debugging and commissioning time to all the subdetec¬tors and central activities like DAQ and trigger. Moreover the running in of the final central services has introduced instabilities related to the co...

  13. Report of the disarmament commission

    International Nuclear Information System (INIS)

    1991-07-01

    At its forty-fifth session, the General Assembly adopted resolution 45/62 B of 4 December 1990, entitled ''Report of the Disarmament Commission'', by which the Assembly, inter alia: notes that no consensus could be reached on specific recommendations for the item regarding various aspects of the arms race, particularly the nuclear-arms race and nuclear disarmament, as well as a general approach to negotiations on nuclear and conventional disarmament; Working Group II on agenda item 5 of the United Nations Disarmament Commission, entitled ''Process of nuclear disarmament in the framework of international peace and security, with the objective of the elimination of nuclear weapons'', held 11 meetings during the 1991 substantive session of the Disarmament Commission which were preceded by a number of rounds of informal consultations conducted by the Chairman. A structure of work which would serve as a guideline for the work of the Group, while at the same time maintaining the general nature of the desired approach was agreed to by the Group; it included the following four items: 1. The relationship between the process of nuclear disarmament and international peace and security; 2. Review of the steps taken in the process of nuclear disarmament; 3. Strengthening the process of nuclear disarmament, necessary conditions, and mechanisms required for it; 4. The role of the United Nations system in the process of nuclear disarmament with the objective of the elimination of nuclear weapons

  14. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    P5 Commissioning activities The commissioning effort at the pit has made major progress since the last CMS week concerning the installation and operation of the off-detector electronics in USC. The progress has been much slower in the experi¬mental cavern due to the delay in the deployment of the infrastructure which should eventually allow safe powering-up of the front ends. Nevertheless, temporary power connections have allowed operation of slices of subdetectors at any given time. HF, HE, ECAL, DTs, RPCs and CSCs have carried out local commissioning tests with these temporary services. The status of hardware deployment in USC and on the towers/balconies is represented in the detailed table below.   Table 1: Status of installation of off-detector electronics. FEDs are detector dependent hardware modules which perform the first ‘colla¬tion’ of front-end data and send it to Central-data for event building. Tracker, ECAL, HCAL have their front end electronics mo...

  15. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The global commissioning campaign begins this year with a series of weekly two-day global runs of limited participation until mid-March. The aim of these runs varies week-to-week, but includes the commissioning the calorimeter triggers, the muon track-finder triggers in the DT/CSC overlap, the PLL locking ranges, and generally accumulating data either for HCAL noise characterization or detector studies with cosmic muons. In mid-March a full Global Run is scheduled with all components participating, followed in April by a Cosmic Run with the aim of collecting statistics over a couple weeks with the installed Tracker and other subsystems. The ultimate milestone is the Cosmic Run At Four Tesla (CRAFT), with a completed CMS closed and the solenoid energized for data-taking during June. The Detector Performance Groups start the year with the focus to prepare for LHC collisions, and the associated challenges (CSA08) and global commissioning exercises (CRAFT) along the way. New this year is the addition of the Tri...

  16. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  17. Implications of urban structure on carbon consumption in metropolitan areas

    International Nuclear Information System (INIS)

    Heinonen, Jukka; Junnila, Seppo

    2011-01-01

    Urban structure influences directly or indirectly the majority of all green house gas (GHG) emissions in cities. The prevailing belief is that dense metropolitan areas produce less carbon emissions on a per capita basis than less dense surrounding rural areas. Consequently, density targets have a major role in low-carbon urban developments. However, based on the results of this study, the connection seems unclear or even nonexistent when comprehensive evaluation is made. In this letter, we propose a hybrid life cycle assessment (LCA) method for calculating the consumption-based carbon footprints in metropolitan areas, i.e. carbon consumption, with the emphasis on urban structures. The method is input-output-based hybrid LCA, which operates with the existing data from the region. The study is conducted by performing an analysis of the carbon consumption in two metropolitan areas in Finland, including 11 cities. Both areas consist of a dense city core and a less dense surrounding suburban area. The paper will illustrate that the influence of urban density on carbon emissions is insignificant in the selected metropolitan areas. In addition, the utilized consumption-based method links the climate effects of city-level development to the global production of emissions.

  18. Disparities in Salaries: Metropolitan versus Nonmetropolitan Community College Faculty

    Science.gov (United States)

    Glover, Louis C.; Simpson, Lynn A.; Waller, Lee Rusty

    2009-01-01

    This article explores disparities in faculty salaries between metropolitan and nonmetropolitan Texas community colleges. The analysis reveals a significant difference in faculty salaries for the 2000 and 2005 academic years respectively. The study found no significant difference in the rate of change in faculty salaries from 2000 to 2005.…

  19. Is There a Global Role for Metropolitan City Libraries?

    Science.gov (United States)

    Mason, Marilyn Gell

    1994-01-01

    Discusses the potential for linking large metropolitan public libraries to international interlibrary loan networks. Issues involved in international networking, including funding, standards, network connectivity, and protectionism, are discussed. Examples of libraries capable of participating and brief descriptions of their collections are given.…

  20. Residential fencing in a metropolitan area and three small towns.

    Science.gov (United States)

    Edwin Kallio; Jerry A. Sesco

    1967-01-01

    Many types of fences were found on residential lots in the metropolitan-suburban area of St. Louis County, Missouri, and three small towns in southern Illinois. Wire fences predominated. More wooden fences were found on village lots than on city lots. In general, the more expensive homes had the most wooden fencing. Homes over 5 years old had more fencing of all...

  1. OXYGEN TRANSFER STUDIES AT THE MADISON METROPOLITAN SEWERAGE DISTRICT FACILITIES

    Science.gov (United States)

    Field studies at the Madison Metropolitan Sewerage District facilities were conducted over a 3-year period to obtain long-term data on the performance of fine pore aeration equipment in municipal wastewater. The studies were conducted on several basins in the East Plant containi...

  2. 'Animateurs' and animation: what makes a good commissioning manager?

    Science.gov (United States)

    Checkland, Kath; Snow, Stephanie; McDermott, Imelda; Harrison, Stephen; Coleman, Anna

    2012-01-01

    To examine the managerial behaviours adopted by commissioning managers in English primary care trusts (PCTs), and to explore the impact of these behaviours. Qualitative case studies were undertaken in four PCTs, focusing on staff engaged in the commissioning of hospital services. Both formal and informal observation were undertaken (150 hours), and 41 in-depth interviews conducted with managers and general practitioners (GPs). Managers adopted many managerial behaviours familiar from the literature, including sharing information, and networking inside and outside the organization. Multiple organizational layers and unclear decision-making processes hindered this activity. In addition, some managers with responsibility for facilitating practice-based commissioning (PbC) adopted a managerial mode that we have called being an 'animateur'. This approach involved the active management of disparate groups of people over whom the manager had no authority, and appeared to be a factor in determining success. It was facilitated by managerial autonomy and was more prevalent where managers were seen to have legitimacy. Some organizational practices appeared to inhibit its development. From 2012/13 it is planned that GPs will be taking more responsibility for commissioning in the English NHS. This research suggests that managers of the new commissioning organizations will require a deep and contextualized understanding of the NHS and that it is important that organizational processes do not inhibit managerial behaviour. Legitimacy may be an issue in contexts were managers are automatically transferred from their existing appointments.

  3. 40 CFR 81.17 - Metropolitan Los Angeles Air Quality Control Region.

    Science.gov (United States)

    2010-07-01

    ... Quality Control Regions § 81.17 Metropolitan Los Angeles Air Quality Control Region. The Metropolitan Los Angeles Air Quality Control Region consists of the following territorial area (including the territorial... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Metropolitan Los Angeles Air Quality...

  4. 40 CFR 81.38 - Metropolitan Houston-Galveston Intrastate Air Quality Control Region.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Metropolitan Houston-Galveston... Designation of Air Quality Control Regions § 81.38 Metropolitan Houston-Galveston Intrastate Air Quality Control Region. The Metropolitan Houston-Galveston Intrastate Air Quality Control Region (Texas) has been...

  5. 40 CFR 81.63 - Metropolitan Fort Smith Interstate Air Quality Control Region.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Metropolitan Fort Smith Interstate Air... Air Quality Control Regions § 81.63 Metropolitan Fort Smith Interstate Air Quality Control Region. The Metropolitan Fort Smith Interstate Air Quality Control Region (Arkansas-Oklahoma) has been revised to consist...

  6. Alaska Public Offices Commission, Department of Administration, State of

    Science.gov (United States)

    Visiting Alaska State Employees State of Alaska Department of Administration Alaska Public Offices Commission Alaska Department of Administration, Alaska Public Offices Commission APOC Home Commission Filer ; AO's Contact Us Administration > Alaska Public Offices Commission Alaska Public Offices Commission

  7. Making the connection: advancing traffic incident management in transportation planning : a primer.

    Science.gov (United States)

    2013-07-01

    "The intent of this primer is to inform and guide traffic incident management (TIM) professionals and transportation planners to initiate and develop collaborative relationships and advance TIM programs through the metropolitan planning process. The ...

  8. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  9. Spatial policy, planning and infrastructure investment: lessons from urban simulations in three South African cities

    CSIR Research Space (South Africa)

    Coetzee, M

    2014-05-01

    Full Text Available from work conducted as part of a Department of Science and Technology (DST)-funded Integrated Planning and Development Modelling (IPDM) project, the article argues that decisions about infrastructure investment in South African metropolitan areas ought...

  10. AC Transmission Emulation Control Strategies for the BTB VSC HVDC System in the Metropolitan Area of Seoul

    Directory of Open Access Journals (Sweden)

    Sungyoon Song

    2017-08-01

    Full Text Available In the Korean power system, growing power loads have recently created the problems of voltage instability and fault current in the Seoul Capital Area (SCA. Accordingly, the back-to-back (BTB voltage source converter (VSC high-voltage direct-current (HVDC system is emerging to resolve such problems with grid segmentation. However, non-convergence problems occur in this metropolitan area, due to the large change of power flow in some contingencies. Therefore, this paper proposes two kinds of AC transmission emulation control (ATEC strategies to improve the metropolitan transient stability, and to resolve the non-convergence problem. The proposed ATEC strategies are able to mitigate possible overloading of adjacent AC transmission, and maintain power balance between metropolitan regions. The first ATEC strategy uses a monitoring system that permits the reverse power flow of AC transmission, and thus effectively improves the grid stability based on the power transfer equation. The second ATEC strategy emulates AC transmission with DC link capacitors in a permissible DC-link voltage range according to angle difference, and securely improves the gird stability, without requiring grid operator schedule decisions. This paper compares two kinds of ATEC schemes: it demonstrates the first ATEC strategy with specific fault scenario with PSS/E (Power Transmission System Planning Software, and evaluates the second ATEC strategy with internal controller performance with PSCAD/EMTDC (Power System Electromagnetic Transients Simulation Software.

  11. Powers and Duties of Corporate Affairs Commission

    African Journals Online (AJOL)

    Mofasony

    POWERS AND DUTIES OF THE CORPORATE AFFAIRS. COMMISSION ... The Registrar-General is the Chief Executive of the Commission and is saddled .... Federal Board of Inland Revenue Department of the Ministry of Finance v). Register ...

  12. Origins, and the construction, commissioning and operation of the SRS

    International Nuclear Information System (INIS)

    Thompson, D.J.

    1985-01-01

    The SRS was initiated in 1973 and approved in 1975. It came into use in 1981. The paper describes the organizational framework at the different stages, the pre-approval, construction, commissioning and operational phases of the storage ring, the build-up of experimental stations, and future plans. The emphasis is on lessons which can be learned by those about to embark on such a project, rather than on a detailed historical account, and on managerial rather than physics matters

  13. Nuclear Regulatory Commission issuances, January 1997. Volume 45, Number 1

    International Nuclear Information System (INIS)

    1997-01-01

    This book contains issuances of the Atomic Safety and Licensing Board, Nuclear Regulatory Commission and Director's Decision for January 1997. The issuances concern Sequoyah Fuels Corporation and General Atomics Gore, Oklahoma Site decontamination and decommissioning funding; Louisiana Energy Services, Claiborne Enrichment Center denies appeal to review emergency planning; General Public Utilities Nuclear Corporation, Oyster Creek Nuclear Generating station, challenges to technical specifications concerning spent fuel pool; and Consumers Power Company, Palisades Nuclear Plant dry cask storage of spent nuclear fuel

  14. U.S. Nuclear Regulatory Commission natural analogue research program

    International Nuclear Information System (INIS)

    Kovach, L.A.; Ott, W.R.

    1995-01-01

    This article describes the natural analogue research program of the U.S. Nuclear Regulatory Commission (US NRC). It contains information on the regulatory context and organizational structure of the high-level radioactive waste research program plan. It also includes information on the conditions and processes constraining selection of natural analogues, describes initiatives of the US NRC, and describes the role of analogues in the licensing process

  15. Atomic Energy Commission Act, 2000 (Act 588)

    International Nuclear Information System (INIS)

    2000-01-01

    Act 588 of the Republic of Ghana entitled, Atomic Energy Commission Act, 2000, amends and consolidates the Atomic Energy Commission Act, 204 of 1963 relating to the establishment of the Atomic Energy Commission. Act 588 makes provision for the Ghana Atomic Energy Commission to establish more institutes for the purpose of research in furtherance of its functions and also promote the commercialization of its research and development results. (E.A.A.)

  16. Bioethics commission to review gene patenting

    Energy Technology Data Exchange (ETDEWEB)

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  17. The Industry Commission inquiry into charitable organisations.

    Science.gov (United States)

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  18. Atomic Energy Commission (Amendment) Law, 1993

    International Nuclear Information System (INIS)

    1993-02-01

    The Atomic Energy Commission (Amendment) Law, 1993 (P.N.D.C.L. 308) seeks to amend the Atomic Energy Commission Act of 1963 (Act 204) so as to provide for the establishment of a Radiation Protection Board and other institutes under the Ghana Atomic Energy Commission. The Law further repeats the Atomic Energy Commission (Amendment) Law of 1982 (P.N.D.C.L. 37). (EAA)

  19. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  20. Commissioning Instrument for the GTC

    Science.gov (United States)

    Cuevas, S.; Sánchez, B.; Bringas, V.; Espejo, C.; Flores, R.; Chapa, O.; Lara, G.; Chavolla, A.; Anguiano, G.; Arciniega, S.; Dorantes, A.; González, J. L.; Montoya, J. M.; Toral, R.; Hernández, H.; Nava, R.; Devaney, N.; Castro, J.; Cavaller-Marqués, L.

    2005-12-01

    During the GTC integration phase, the Commissioning Instrument (CI) will be a diagnostic tool for performance verification. The CI features four operation modes: imaging, pupil imaging, Curvature WFS, and high resolution Shack-Hartmann WFS. This instrument was built by the Instituto de Astronomía UNAM and the Centro de Ingeniería y Desarrollo Industrial (CIDESI) under GRANTECAN contract after a public bid. In this paper we made a general instrument overview and we show some of the performance final results obtained when the Factory Acceptance tests previous to its transport to La Palma.

  1. 17 CFR 201.57 - Commission review.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review. 201.57... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the... Division of the Commission may seek review of the initial decision on the fee application, or the...

  2. Phase C commissioning-Cernavoda Unit 2

    International Nuclear Information System (INIS)

    Munro, Robert

    2007-01-01

    Phase C commissioning program includes over 500 individual tests and checks which are carefully planned and scheduled at the correct power level. Some of the major tests are the following: - heat transport thermosyphoning test at 3% Full Power (FP); - dual computer failure test at 15% FP; - turbine overspeed test and generator first synchronization; - load rejection tests at 25, 50, 75 and 100% FP; - loss of Class IV Power test at 25% FP; - shutdown system (SDS nr. 1 and SDS nr. 2) tests at >60% FP; - condensate extraction and boiler feedwater pump trip tests at 100% FP; - power cycling through reactor setback from 100 to 10 and back to 100% FP; - condenser steam discharge valve tests with reactor at 100% FP and turbine at 60% output; - low pressure and high pressure heater box-up tests at 100% FP. Progress through the Phase C program is controlled at six specific Commissioning Control Points (CCPs) which meet the Romanian Regulatory Authority (CNCAN) and Management requirements. These CCPs are the following: PI - Approval for Power increase to 5% FP; PP1 - Approval for Power increase to 25% FP; PP2 - Approval for Power increase to 50% FP; PP3 - Approval for Power increase to 75% FP; PP4 - Approval for Power increase to 100% FP. Prior to releasing each of these CCPs both Management and CNCAN complete an assessment of the 'Readiness' to proceed to the next power plateau. The readiness includes a review of the plant material condition, results of previous tests, documentation status, and operability maintainability issues. (author)

  3. High-capacity transport, floor area ratio and its relationship with urbanization of metropolitan areas

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho da Costa, B.L. de; Carvalho da Costa, F.B. de

    2016-07-01

    Most of the world’s population lives in urban areas (54%). Near 42% of the global urban population live in cities with more than 1 million inhabitants, where problems associated with urban sprawl such as informal settlement, social-economic changes, environmental degradation and deficient high-capacity transport (HCT) systems are common. Meanwhile, urbanization and its associated transportation infrastructure define the relationship between city and countryside, between the city’s inner core and the periphery, between the citizen and his right to move. This article discusses and presents an overview about the relationship between the planning and extension of HCT systems and urban planning, (in the figure of the floor-area ratio - FAR- prescribed in regulations). The methodological approach consists of drawing a conceptual framework and studying 33 different cities of metropolitan areas on five continents. It’s noticed that areas in cities with a high construction potential but with an insufficient HCT negatively influence in urban mobility and hence the right to the city. We consider right to the city the various social and fundamental rights that, among others, includes the right to public transportation. Therefore there’s a real need of an integrated approach of community participation, FAR distribution, urban planning and transportation planning and so that urbanization, inevitable these days, takes place in a fair and harmonious way. (Author)

  4. Planejamento e aspectos ambientais envolvidos na disposição final de lodos das estações de tratamento de água da Região Metropolitana de São Paulo Planning and environmental aspects involved in the final disposal of sludge from water treatment plants in the Metropolitan Area of Sao Paulo

    Directory of Open Access Journals (Sweden)

    Gladys Fernandes Januário

    2007-06-01

    Full Text Available A disposição de lodos de estações de tratamento de água (ETAs de forma ambientalmente correta configura-se em mais um desafio a ser enfrentado pelas companhias de saneamento e tem recebido maior atenção no Brasil e na Região Metropolitana de São Paulo (RMSP nos últimos anos. O objetivo deste trabalho foi apresentar alternativas existentes de uso e disposição final dos lodos das ETAs da RMSP e, assim sendo, foram pesquisadas várias técnicas de uso e disposição de lodos praticados no Brasil e no mundo e suas condições técnicas e ambientais. Foram avaliadas a quantidade de lodos gerados na RMSP e a existência ou previsão de implantação de sistemas de adensamento e desidratação e, a partir destas informações, foram identificadas alternativas de uso e disposição tecnicamente e ambientalmente exeqüíveis para os lodos das ETAs da RMSP.The disposal of sludge produced by water treatment plants in an environmentally safe manner is one more challenge to be faced by the sanitation companies and has been given more attention in Brazil and in the Metropolitan Area of Sao Paulo (MASP. The purpose of this work is to present the existing alternatives for use and final disposal of sludge produced by the Water Treatment Plants (WTP of the MASP. In this respect, several techniques for use and disposal of sludge performed in Brazil and worldwide have been investigated, and their technical and environmental conditions. The amount of sludge generated in the MASP and the existence of or the forecast to establish sludge thickening and dewatering systems have been evaluated and based on this information alternatives have been identified for use and disposal which are technically and environmentally feasible for sludge produced by the WTP in the MASP.

  5. Sachet drinking water in Ghana’s Accra-Tema metropolitan area: past, present, and future

    Science.gov (United States)

    Weeks, John R.; Fink, Günther

    2013-01-01

    Population growth in West Africa has outpaced local efforts to expand potable water services, and private sector sale of packaged drinking water has filled an important gap in household water security. Consumption of drinking water packaged in plastic sachets has soared in West Africa over the last decade, but the long-term implications of these changing consumption patterns remain unclear and unstudied. This paper reviews recent shifts in drinking water, drawing upon data from the 2003 and 2008 Demographic and Health Surveys, and provides an overview of the history, economics, quality, and regulation of sachet water in Ghana’s Accra-Tema Metropolitan Area. Given the pros and cons of sachet water, we suggest that a more holistic understanding of the drinking water landscape is necessary for municipal planning and sustainable drinking water provision. PMID:24294481

  6. Sachet drinking water in Ghana's Accra-Tema metropolitan area: past, present, and future.

    Science.gov (United States)

    Stoler, Justin; Weeks, John R; Fink, Günther

    2012-01-01

    Population growth in West Africa has outpaced local efforts to expand potable water services, and private sector sale of packaged drinking water has filled an important gap in household water security. Consumption of drinking water packaged in plastic sachets has soared in West Africa over the last decade, but the long-term implications of these changing consumption patterns remain unclear and unstudied. This paper reviews recent shifts in drinking water, drawing upon data from the 2003 and 2008 Demographic and Health Surveys, and provides an overview of the history, economics, quality, and regulation of sachet water in Ghana's Accra-Tema Metropolitan Area. Given the pros and cons of sachet water, we suggest that a more holistic understanding of the drinking water landscape is necessary for municipal planning and sustainable drinking water provision.

  7. Early Atomic Bomb Casualty Commission perceptions and planning

    International Nuclear Information System (INIS)

    Friedell, H.L.

    1982-01-01

    A description of the kind of research carried on by the Manhattan Project during World War II is presented. At that time scientists were trying to identify acceptable radiation levels, and to ascertain whether any immediate research was needed to support such levels. The author briefly outlines activities to determine any immediate effects of radiation that occurred after the nuclear strikes in Hiroshima and Nagasaki

  8. US Nuclear Regulatory Commission, 1984 annual report. Volume 1

    International Nuclear Information System (INIS)

    1985-01-01

    This is the 10th annual report of the US Nuclear Regulatory Commission (NRC). This report covers the major activities, events, decisions and planning that took place during fiscal year 1984 (October 1983 through September 1984) within the NRC or involving the NRC. Information is presented concerning 1984 highlights and planning for 1985; reactor regulation; cleanup at Three Mile Island Unit 2; operational experience; nuclear materials; safeguards; waste management; inspection, enforcement, quality assurance, and emergency preparedness; cooperation with the States; international programs; nuclear regulatory research; proceedings and litigation; and management and communication

  9. Commissioning of the CEBAF cryomodules

    International Nuclear Information System (INIS)

    Drury, M.; Lee, T.; Marshall, J.; Preble, J.; Saulter, Q.; Schneider, W.; Spata, M.; Wiseman, M.

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, over half of the cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz. A cryomodule must provide an energy gain of 20 MeV to the 200 μA beam. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's of the cavity ports, the unloaded Q (Q 0 ) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity. The sensitivity of the resonant frequency to changes in pressure and gradient is also measured. Finally, the mechanical tuners are cycled and characterized. In all cases, the performance of CEBAF cryomodules has exceeded the design requirements. A portable test stand allows local control of the rf system and provides automated data acquisition. This paper describes the cryomodule commissioning hardware, software, and measurements

  10. A study of risk in the metropolitan area of Guadalajara through dense GPS geodesy

    Science.gov (United States)

    Marquez-Azua, B.; Saldana-Hernandez, F.; Medina de La Pena, H.

    2007-05-01

    Geodesic measurements from the Global Positioning System (GPS) are used extensively for basic earth science research into natural hazards and seismic risk. In the private sector, GPS technology is additionally used for cadastral and photogrammetric mapping surveys, definition of political-administrative limits, space analysis with thematic cartography, GIS, and land-use planning, with a wide variety of applied social, economic, and political purposes, including conservation of the environment. The city of Guadalajara and its surrounding urban area has expanded greatly in the last three decades as a result of industrial, commercial and housing activity that have substantially changed in their urban morphology. This period of unprecedented growth has occurred primarily in an unplanned and sometimes disarticulated and unbalanced manner, incongruous with the development of the most important city in western Mexico. The Department of Geography of the University of Guadalajara and the Institute of Territorial Information of the State of Jalisco (IITJ) have initiated a study of 89 geodetic sites that are located in the metropolitan zone of Guadalajara to assist in future planning and regulation of urban development, including urban and rural cadastral surveys and the establishment of diverse public services. Our work includes careful examination and evaluation of the quality and distribution of these geodetic sites with regard to anticipated growth of the metropolitan municipalities, and the vulnerability of urban zones to ground subsidence or landslides. Guadalajara is also located in a seismic zone, making precise continuous GPS measurements useful for identifying rates of strain accumulation and aseismic strain events that cannot be measured by seismographs.

  11. Assessment of flood risk in Tokyo metropolitan area

    Science.gov (United States)

    Hirano, J.; Dairaku, K.

    2013-12-01

    Flood is one of the most significant natural hazards in Japan. The Tokyo metropolitan area has been affected by several large flood disasters. Therefore, investigating potential flood risk in Tokyo metropolitan area is important for development of adaptation strategy for future climate change. We aim to develop a method for evaluating flood risk in Tokyo Metropolitan area by considering effect of historical land use and land cover change, socio-economic change, and climatic change. Ministry of land, infrastructure, transport and tourism in Japan published 'Statistics of flood', which contains data for flood causes, number of damaged houses, area of wetted surface, and total amount of damage for each flood at small municipal level. By using these flood data, we estimated damage by inundation inside a levee for each prefecture based on a statistical method. On the basis of estimated damage, we developed flood risk curves in the Tokyo metropolitan area, representing relationship between damage and exceedance probability of flood for the period 1976-2008 for each prefecture. Based on the flood risk curve, we attempted evaluate potential flood risk in the Tokyo metropolitan area and clarify the cause for regional difference of flood risk. By analyzing flood risk curves, we found out regional differences of flood risk. We identified high flood risk in Tokyo and Saitama prefecture. On the other hand, flood risk was relatively low in Ibaraki and Chiba prefecture. We found that these regional differences of flood risk can be attributed to spatial distribution of entire property value and ratio of damaged housing units in each prefecture.We also attempted to evaluate influence of climate change on potential flood risk by considering variation of precipitation amount and precipitation intensity in the Tokyo metropolitan area. Results shows that we can evaluate potential impact of precipitation change on flood risk with high accuracy by using our methodology. Acknowledgments

  12. LAND USE PLANNING AND URBAN PLANS: TERRITORIAL BALANCE AS ETHICS

    Directory of Open Access Journals (Sweden)

    Eunice Helena Sguizzardi Abascal

    2012-07-01

    Full Text Available The article suggests a necessary link between urban planning and territorial organization, in order to, through the synergistic relationship between planning tools and their application to planning, implementing a policy of urban and regional management. By linking the development plan for territorial development plans and categories of land use, this methodology helps to streamline operations at multiple scales. The establishment of this network of instruments and shapes the actions of government action against the rapid and intense increase of only economic forces that shape the territory today, suggesting that it is possible to regulate the action of the housing market through planned interventions, valuing the regional balance, social and environmental - ethical by definition. It is suggested that the possible effects predatory natural and built environment can be reversed or prevented by an action articulating these planning instruments are linked to the development and implementation of plans (and projects at multiple scales, approaching from the regional to the local and metropolitan, from regional policies to sectors, that are incidents in the municipal territory. However, the speed and magnitude of the occupation and transformation of soil occur mainly in periods of heating housing, often jeopardize the balance and environmental quality, natural heritage, urban and landscape. It assumes the argument that the overcoming of undesirable environmental effects, triggered by occupation of the ground guided by the real estate sector fast action can be successful with the articulation of levels of planning and intervention. It is proposed that the complexity of contemporary urban and metropolitan requires the articulation of different scales through the use of innovative urban instruments. By articulating these different scales, at the municipal and other levels supra, contributes to, through a network plan to overcome the undesirable dichotomy

  13. Local Option Taxes and the New Subregionalism in Transportation Planning

    OpenAIRE

    Goldman, Todd Mitchel

    2005-01-01

    This dissertation examines the planning processes for new local option transportation taxes. Typically, these are temporary, voter-approved, single-county sales taxes linked to legally binding expenditure plans. In many states, they increasingly dominate transportation planning and finance. Because they bypass the federally-mandated metropolitan planning process, they appear to place at risk important policy goals (e.g. reducing air pollution) that it is intended to address. Yet they can also...

  14. Dinámicas de ocupación urbana del anillo verde metropolitano de Madrid = Urban occupation dynamics of Madrid´s Metropolitan Greenbelt

    Directory of Open Access Journals (Sweden)

    Lourdes Jiménez Garcinuño

    2017-05-01

    ABSTRACT: The Metropolitan Greenbelt was defined by the 1963 Master Plan for the Madrid Metropolitan Area (MMA, following established international models of urban development, as the structural framework of the MMA, the principal open space within its network of open spaces and a public area of recreation and contact with nature for the residents of Madrid. However, it had become a reserve of land in which various alliances between the institutional authorities and the dominant social class, have been operating on the margin of the original plan, exposing a scarcity of legal and cultural resources for the safeguarding of common interests, and in which the geographical and natural characteristics of the territory itself have come to play an influential role in the functional specialization and spatial segregation of the MMA.

  15. Molr - A delegation framework for accelerator commissioning

    CERN Document Server

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  16. Report made on the behalf of the economy, sustainable development, and land planning Commission on the bill project concerning the national commitment for the environment (declared emergency), the bill proposition presented by M. Philippe MARINI and several of his colleagues tending to make mandatory citizen consultation before settling high wind turbines, the bill proposition presented by M. Jean DESSARD and several of his colleagues and related to the regulation of cell telephony relay antenna settling and the reduction of people exposure to electromagnetic fields

    International Nuclear Information System (INIS)

    2009-01-01

    This report first discusses the economical stakes of the 'Grenelle de l'Environnement', i.e. a dynamic and environmentally sustainable growth, outlining the need for quick and strong arrangements, and the expected benefit of an environment-friendly policy, but also the difficulties and ways to accompany a green growth. Then, it presents the main arrangements of the bill project. These arrangements are concerning building and urban planning, transports, energy and climate, biodiversity, risks, health and wastes, and governance. It presents the Commission's opinion and the main modifications this commission introduced in the numerous articles associated with these different topics

  17. ELECTRICITY DEMAND IN A NORTHERN MEXICO METROPOLITAN ECONOMY

    Directory of Open Access Journals (Sweden)

    Thomas M. Fullerton

    2014-10-01

    Full Text Available Using an error correction framework, this study analyzes the long- and short-run dynamics of electricity demand in Ciudad Juarez, a large metropolitan economy on Mexico’s northern border. Demand is decomposed into the total number of electricity accounts and electricity usage per customer, each of which is modeled separately. A two-stage least squares approach is used to estimate the per customer electricity demand equations due to the endogeneity of the average price variable. The results indicate sustained growth in population, employment, and income can be expected to exert substantial upward pressure on regional electric power demand. Furthermore, demand is found to be price-inelastic in this metropolitan area, suggesting that rate increases can help raise the revenues necessary to fund expansion of the electrical grid.

  18. Analysis of Solid Waste Management and Strategies for Bangkok Metropolitan

    Directory of Open Access Journals (Sweden)

    Palika Wannawilai

    2017-04-01

    Full Text Available This study aimed to examine and analyze strategic gaps and the environment of waste management of Bangkok Metropolitan Administration (BMA in order to suggest suitable waste management strategies for Bangkok Metropolitan. The study was conducted by interviewing BMA and districts’ administrators and officers, local leaders and people, and private sectors, conducting a focus group, as well as reviewing relevant documents. The data was analyzed by applying Gap analysis and SWOT analysis. The proposed five strategies are: 1 enhancement of efficiency in solid waste and hazardous waste management; 2 discipline, participation and responsibility of citizens and all sectors related to waste management; 3 appropriate and integrated waste management; 4 capacity building for BMA’s staff and improvement of solid waste management system; and 5 research and development of knowledge and technology in waste management. The study also suggested driving approaches for effective implementation of the strategies.

  19. Use of renewable energy in the greater metropolitan area

    International Nuclear Information System (INIS)

    Arias Garcia, Rocio; Castro Gomez, Gustavo; Fallas Cordero, Kenneth; Grant Chaves, Samuel; Mendez Parrales, Tony; Parajeles Fernandez, Ivan

    2012-01-01

    A study is conducted on different renewable energy within the larger metropolitan area, selecting the most suitable for the area and the implementation for distributed generation. A research methodology is practiced type pretending gather the necessary information to make proposals selected of different type of energy. The geography of the greater metropolitan area is studied along with the different existing renewable energy: distributed generation, remote measurement of energy which is one of the elements of the concept of intelligent networks (Smart Grid) in the electricity sector, legislation of Costa Rica regarding the generation of renewable energy and environmental impact. An analysis of economic feasibility is covered for each of the proposals estimating current rates for leading distributors of a future value, concluding with the viability of projects for possible execution of the same. (author) [es

  20. Validating the accuracy of GIS-based accessibility analysis in determining public primary health care demand in metropolitan areas: conference presentation

    CSIR Research Space (South Africa)

    Mokgalaka, H

    2014-07-01

    Full Text Available selected for the analysis are mainly those that offered public primary health care services and acted as first point of contact with the health service delivery system. Attached to the facility data are attribute data indicating the capacity...-Based Accessibility Analysis in Determining Public Primary Health Care Demand in Metropolitan Areas Hunadi Mokgalaka July 2014 Contents • Service access planning • GIS-based accessibility analysis • Key challenges to application • Methodology...

  1. SERPUKHOV: UNK transfer beamline commissioned

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    At the end of the 1000 hour February-March run of the 70 GeV proton synchrotron at the Institute for High Energy Physics (IHEP), Serpukhov, near Moscow, the new 2.7-kilometre UNK Beam Transfer Line (BTL) was commissioned with proton beam. BTL will eventually transfer beam from the existing U70 proton accelerator to the first stage of the UNK (UNK-1, now under construction) where it will be accelerated in the 21- kilometre ring up to 600 GeV. BTL was designed for proton energies between 60 and 70 GeV, momentum spread ± 2 x 10 -3 and beam emittance 2 mm.mrad, with systems for fast ejection, beam transfer and injection into UNK-1

  2. Commissioning and operation of DRAGON

    International Nuclear Information System (INIS)

    Engel, Sabine

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the 21 Na(p,γ) 22 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of ±20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented

  3. Commissioning and operation of DRAGON

    CERN Document Server

    Engel, S

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the sup 2 sup 1 Na(p,gamma) sup 2 sup 2 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of +-20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented.

  4. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    T. Camporesi

    The central commissioning activities have concentrated mostly in the Service cavern. Since early February the central DAQ has been ready to accept connections from FEDs from the various partitions. This has triggered a campaign from all subdetectors to install their readout crates in USC55. Systematic tests of the connections between FEDs and Central DAQ have been scheduled and to date more than 70% of all FED connections have been successfully tested from almost all subdetectors. In March the Level 1 trigger team started deployment of their hardware followed by a campaign of testing the connections between Trigger primitive generators and the corresponding LV1 hardware (Regional Calorimeter Trigger and Global Muon Trigger). The functionality tests are continuing to date by pattern tests of increasing complexity. In April the central DAQ was ready to start FED system tests, which amounts to testing the data reading and trans¬fer-ability from the FEDs to the Filter Units (with or without an actual ...

  5. Division A Commission 31: Time

    Science.gov (United States)

    Hosokawa, Mizuhiko; Arias, Elisa Felicitas; Manchester, Richard; Tuckey, Philip; Matsakis, Demetrios; Zhang, Shougang; Zharov, Vladimir

    2016-04-01

    Time is an essential element of fundamental astronomy. In recent years there have been many time-related issues, in scientific and technological aspects as well as in conventions and definitions. At the Commission 31 (Time) business meeting at the XXIX General Assembly, recent progress and many topics, including Pulsar Time Scales WG and Future UTC WG activities, were reviewed and discussed. In this report, we will review the progress of these topics in the past three years. There are many remarkable topics, such as Time scales, Atomic clock development, Time transfer, Future UTC and future redefinition of the second. Among them, scientific highlights are the progress of pulsar time scales and the optical frequency standards. On the other hand, as the social convention, change in the definition of UTC and the second is important.

  6. FINANCING FARMLAND PRESERVATION: THE TWIN CITIES METROPOLITAN AREA EXPERIENCE

    OpenAIRE

    Greden, Leah R.; Taff, Steven J.

    1994-01-01

    Two farmland protection programs in the Twin Cities (Minnesota) Metropolitan Area--Green Acres and Agricultural Preserves-- together enrolled 608,331 acres in 1992. The principal financing tool was a provision common to both programs under which participating landowners paid reduced property taxes in exchange for certain non- development assurances. The resulting shift in property tax obligations to other taxpayers amounted to $7.6 million for the 1993 tax year, an average shift of $12.50 per...

  7. Skinner boxes for psychotics: Operant conditioning at Metropolitan state hospital

    OpenAIRE

    Rutherford, Alexandra

    2003-01-01

    Between 1953 and 1965, Ogden Lindsley and his associates conducted free-operant research with psychiatric inpatients and normal volunteers at Metropolitan State Hospital in Waltham, Massachusetts. Their project, originally named “Studies in Behavior Therapy,” was renamed “Harvard Medical School Behavior Research Laboratory” in 1955. This name change and its implications were significant. The role of the laboratory in the history of the relationship between the experimental analysis of behavio...

  8. SPATIAL SEGMENTATION WITHIN METROPOLITAN LABOUR MARKET: MAPPING THE GENDER DIMENSION

    OpenAIRE

    DEBNATH, TANIA

    2017-01-01

    Spatial segmentation of the labour market of informal workers within the metropolitan is observed globally. InIndia it is not only compartmentalised on gender, caste, ethnic lines but also geographically segmented by thecreation of spatially disjoined markets. The differential impact of this limited mobility on female and malelabour remains largely unexplored. The present paper argues that the labour market for informal workers issegmented into smaller labour markets separated by commuting (h...

  9. Factors Influencing Patronage Of Medical Tourism In Metropolitan Lagos Nigeria

    OpenAIRE

    Omisore; E.O.; Agbabiaka; H. I.

    2015-01-01

    Since medical tourism attract patient from various origin to seek medical services at different destinations it is paramount to consider the factors that motivate patrons decision on medical tourism. Hence this study assesses the factors influencing patronage of medical tourism in Lagos metropolis Nigeria. Lagos State is situated in the southwestern corner of Nigeria it lies within Latitudes 62N to 64N of the Equator and Longitudes 245E to 420E of the Greenwich meridian. Metropolitan Lagos is...

  10. The determinants of part-time work in Metropolitan Lima

    OpenAIRE

    Manuel Enrique Saavedra Martinez

    2011-01-01

    The following paper examines the part-time work in Metropolitan Lima in 2008. The overall objective is to identify the determinants of the incidence of part-time work in Lima. We worked with one Probit econometric model, measured by the National Survey of Households (NSH), which explores the job characteristics of people. This will determine the presence of part-time workers in the areas of trade, health, education and communication; also realized that this group has completed university stud...

  11. The determinants of part-time work in Metropolitan Lima

    OpenAIRE

    Saavedra Martinez, Manuel Enrique

    2012-01-01

    The following paper examines the part-time work in Metropolitan Lima in 2008. The overall objective is to identify the determinants of the incidence of part-time work in Lima. We worked with one Probit econometric model, measured by the National Survey of Households (NSH), which explores the job characteristics of people. This will determine the presence of part-time workers in the areas of trade, health, education and communication; also realized that this group has completed university stud...

  12. The 1987 Whittier Narrows, California, earthquake: A Metropolitan shock

    OpenAIRE

    Hauksson, Egill; Stein, Ross S.

    1989-01-01

    Just 3 hours after the Whittier Narrows earthquake struck, it became clear that a heretofore unseen geological structure was seismically active beneath metropolitan Los Angeles. Contrary to initial expectations of strike-slip or oblique-slip motion on the Whittier fault, whose north end abuts the aftershock zone, the focal mechanism of the mainshock showed pure thrust faulting on a deep gently inclined surface [Hauksson et al., 1988]. This collection of nine research reports spans the spectru...

  13. TH-AB-201-10: Portal Dosimetry with Elekta IViewDose:Performance of the Simplified Commissioning Approach Versus Full Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Kydonieos, M; Folgueras, A; Florescu, L; Cybulski, T; Marinos, N; Thompson, G; Sayeed, A [Elekta Limited, Crawley, West Sussex (United Kingdom); Rozendaal, R; Olaciregui-Ruiz, I [Netherlands Cancer Institute - Antoni van Leeuwenhoek, Amsterdam, Noord-Holland (Netherlands); Subiel, A; Patallo, I Silvestre [National Physical Laboratory, London (United Kingdom)

    2016-06-15

    Purpose: Elekta recently developed a solution for in-vivo EPID dosimetry (iViewDose, Elekta AB, Stockholm, Sweden) in conjunction with the Netherlands Cancer Institute (NKI). This uses a simplified commissioning approach via Template Commissioning Models (TCMs), consisting of a subset of linac-independent pre-defined parameters. This work compares the performance of iViewDose using a TCM commissioning approach with that corresponding to full commissioning. Additionally, the dose reconstruction based on the simplified commissioning approach is validated via independent dose measurements. Methods: Measurements were performed at the NKI on a VersaHD™ (Elekta AB, Stockholm, Sweden). Treatment plans were generated with Pinnacle 9.8 (Philips Medical Systems, Eindhoven, The Netherlands). A farmer chamber dose measurement and two EPID images were used to create a linac-specific commissioning model based on a TCM. A complete set of commissioning measurements was collected and a full commissioning model was created.The performance of iViewDose based on the two commissioning approaches was compared via a series of set-to-work tests in a slab phantom. In these tests, iViewDose reconstructs and compares EPID to TPS dose for square fields, IMRT and VMAT plans via global gamma analysis and isocentre dose difference. A clinical VMAT plan was delivered to a homogeneous Octavius 4D phantom (PTW, Freiburg, Germany). Dose was measured with the Octavius 1500 array and VeriSoft software was used for 3D dose reconstruction. EPID images were acquired. TCM-based iViewDose and 3D Octavius dose distributions were compared against the TPS. Results: For both the TCM-based and the full commissioning approaches, the pass rate, mean γ and dose difference were >97%, <0.5 and <2.5%, respectively. Equivalent gamma analysis results were obtained for iViewDose (TCM approach) and Octavius for a VMAT plan. Conclusion: iViewDose produces similar results with the simplified and full commissioning

  14. Seismological and geological investigation for earthquake hazard in the Greater Accra Metropolitan Area

    International Nuclear Information System (INIS)

    Doku, M. S.

    2013-07-01

    A seismological and geological investigation for earthquake hazard in the Greater Accra Metropolitan Area was undertaken. The research was aimed at employing a methematical model to estimate the seismic stress for the study area by generating a complete, unified and harmonized earthquake catalogue spanning 1615 to 2012. Seismic events were souced from Leydecker, G. and P. Amponsah, (1986), Ambraseys and Adams, (1986), Amponsah (2008), Geological Survey Department, Accra, Ghana, Amponsah (2002), National Earthquake Information Service, United States Geological Survey, Denver, Colorado 80225, USA, the International Seismological Centre and the National Data Centre of the Ghana Atomic Energy Commission. Events occurring in the study area were used to create and Epicentral Intensity Map and a seismicity map of the study area after interpolation of missing seismic magnitudes. The least square method and the maximum likelihood estimation method were employed to evaluate b-values of 0.6 and 0.9 respectively for the study area. A thematic map of epicentral intensity superimposed on the geology of the study area was also developed to help understand the relationship between the virtually fractured, jointed and sheared geology and the seismic events. The results obtained are indicative of the fact that the stress level of GAMA has a telling effect on its seismicity and also the events are prevalents at fractured, jointed and sheared zones. (au)

  15. Uber and Metropolitan Traffic Fatalities in the United States.

    Science.gov (United States)

    Brazil, Noli; Kirk, David S

    2016-08-01

    Uber and similar rideshare services are rapidly dispersing in cities across the United States and beyond. Given the convenience and low cost, Uber has been characterized as a potential countermeasure for reducing the estimated 121 million episodes of drunk driving and the 10,000 resulting traffic fatalities that occur annually in the United States. We exploited differences in the timing of the deployment of Uber in US metropolitan counties from 2005 to 2014 to test the association between the availability of Uber's rideshare services and total, drunk driving-related, and weekend- and holiday-specific traffic fatalities in the 100 most populated metropolitan areas in the United States using negative binomial and Poisson regression models. We found that the deployment of Uber services in a given metropolitan county had no association with the number of subsequent traffic fatalities, whether measured in aggregate or specific to drunk-driving fatalities or fatalities during weekends and holidays. © The Author 2016. Published by Oxford University Press on behalf of the Johns Hopkins Bloomberg School of Public Health. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  16. Twelve metropolitan carbon footprints. A preliminary comparative global assessment

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Brown, Marilyn A.

    2010-01-01

    A dearth of available data on carbon emissions and comparative analysis between metropolitan areas make it difficult to confirm or refute best practices and policies. To help provide benchmarks and expand our understanding of urban centers and climate change, this article offers a preliminary comparison of the carbon footprints of 12 metropolitan areas. It does this by examining emissions related to vehicles, energy used in buildings, industry, agriculture, and waste. The carbon emissions from these sources - discussed here as the metro area's partial carbon footprint - provide a foundation for identifying the pricing, land use, help metropolitan areas throughout the world respond to climate change. The article begins by exploring a sample of the existing literature on urban morphology and climate change and explaining the methodology used to calculate each area's carbon footprint. The article then depicts the specific carbon footprints for Beijing, Jakarta, London, Los Angeles, Manila, Mexico City, New Delhi, New York, Sao Paulo, Seoul, Singapore, and Tokyo and compares these to respective national averages. It concludes by offering suggestions for how city planners and policymakers can reduce the carbon footprint of these and possibly other large urban areas. (author)

  17. 25 CFR 700.93 - Relocation plan.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Relocation plan. 700.93 Section 700.93 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES General Policies and Instructions Definitions § 700.93 Relocation plan. The relocation plan shall be the plan prepared...

  18. MDT Commissioning Procedures Guidelines for Certifying RFI Chambers

    CERN Document Server

    Beretta, M; Branchini, P; Kourkoumelis, C; Dubbert, J; Gazis, E N; Hertenberger, R; Hurst, P; Kojine, A; Lanza, A; Marin, A; Mockett, P; Petridou, C; Tskhadadze, E G; Valente, P; Wotschack, J; Xie, Y; Zhao, Z

    2004-01-01

    Aim of the document is the definition of a common set of guidelines and test procedures for commissioning the MDT chambers. Commissioning is different for Barrel and Endcap chambers. The former will be tested at a single chamber level before going to the ATLAS pit, ready for the last quick test before final installation, while the latter will be first tested at a single chamber level (phase one), then installed into the Small and Big Wheel sectors (SW and BW), tested after the integration (phase two) and transported to the ATLAS pit for final wheel installation. The present document concerns all tests, including those of phase two for Endcap chambers, but it is possible that some specific tests, at the moment not planned, will be implemented during the Endcap phase two commissioning. It is composed of three sections: 1 â€" Guidelines for checking chamber conformity, where the main rules for declaring that chambers conform to the reference drawings and requirements are described; 2 â€" Commissioning tests,...

  19. HYTEST Phase I Facility Commissioning and Modeling

    Energy Technology Data Exchange (ETDEWEB)

    Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

    2009-09-01

    The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities – that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

  20. Earthquake Risk Mitigation in the Tokyo Metropolitan area

    Science.gov (United States)

    Hirata, N.; Sakai, S.; Kasahara, K.; Nakagawa, S.; Nanjo, K.; Panayotopoulos, Y.; Tsuruoka, H.

    2010-12-01

    Seismic disaster risk mitigation in urban areas constitutes a challenge through collaboration of scientific, engineering, and social-science fields. Examples of collaborative efforts include research on detailed plate structure with identification of all significant faults, developing dense seismic networks; strong ground motion prediction, which uses information on near-surface seismic site effects and fault models; earthquake resistant and proof structures; and cross-discipline infrastructure for effective risk mitigation just after catastrophic events. Risk mitigation strategy for the next greater earthquake caused by the Philippine Sea plate (PSP) subducting beneath the Tokyo metropolitan area is of major concern because it caused past mega-thrust earthquakes, such as the 1703 Genroku earthquake (magnitude M8.0) and the 1923 Kanto earthquake (M7.9) which had 105,000 fatalities. A M7 or greater (M7+) earthquake in this area at present has high potential to produce devastating loss of life and property with even greater global economic repercussions. The Central Disaster Management Council of Japan estimates that the M7+ earthquake will cause 11,000 fatalities and 112 trillion yen (about 1 trillion US$) economic loss. This earthquake is evaluated to occur with a probability of 70% in 30 years by the Earthquake Research Committee of Japan. In order to mitigate disaster for greater Tokyo, the Special Project for Earthquake Disaster Mitigation in the Tokyo Metropolitan Area (2007-2011) was launched in collaboration with scientists, engineers, and social-scientists in nationwide institutions. The results that are obtained in the respective fields will be integrated until project termination to improve information on the strategy assessment for seismic risk mitigation in the Tokyo metropolitan area. In this talk, we give an outline of our project as an example of collaborative research on earthquake risk mitigation. Discussion is extended to our effort in progress and