  1. Hydroelectric Power Plants Dobsina

    International Nuclear Information System (INIS)

    Majercak, V.; Srenkelova, Z.; Kristak, J.G.

    1997-01-01

    In this brochure the Hydroelectric Power Plants Dobsina, (VED), subsidiary of the utility Slovenske Elektrarne, a.s. (Slovak Electric, plc. Bratislava) are presented. VED is mainly aimed at generating peak-load electrical energy and maintenance of operational equipment. Reaching its goals, company is first of all focused on reliability of production, economy and effectiveness, keeping principles of work safety and industry safety standards and also ecology. VED operates eight hydroelectric power plants, from which PVE Ruzin I and PVE Dobsina I are pump storage ones and they are controlled directly by the Slovak Energy Dispatch Centre located in Zilina thought the system LS 3200. Those power plants participate in secondary regulation of electrical network of Slovakia. They are used to compensate balance in reference to foreign electrical networks and they are put into operation independently from VED. Activity of the branch is focused mainly on support of fulfilment of such an important aim as electric network regulation. Beginnings of the subsidiary Hydroelectric Power Plants Dobsina are related to the year of 1948. After commissioning of the pump storage Hydroelectric Power Plants Dobsina in 1953, the plant started to carry out its mission. Since that time the subsidiary has been enlarged by other seven power plants, through which it is fulfilling its missions nowadays. The characteristics of these hydroelectric power plants (The pump-storage power plant Dobsina, Small hydroelectric power plant Dobsina II, Small hydroelectric power plant Rakovec, Small hydroelectric power plant Svedlar, Hydroelectric power plant Domasa, The pump-storage power plant Ruzin, and Small hydroelectric power plant Krompachy) are described in detail. Employees welfare and public relations are presented

  2. Small hydroelectric power plants

    International Nuclear Information System (INIS)

    Helgesen, Boerre

    2002-01-01

    Small hydroelectric power plants are power plants of 1 - 10 MW. For a supplier, this is an unnatural limit. A more natural limit involves compact engine design and simplified control system. The article discusses most of the engine and electrotechnical aspects in the development, construction and operation of such a plant

  3. Hydroelectric power and hydroelectric power plants. V. 1

    International Nuclear Information System (INIS)

    1991-06-01

    Following the oil crises of 1973 and 1979, there was renewed and justifiable interest in small hydroelectric plants. The maximum power of these plants rarely exceeds 10 MW, and their development will surely increase in the coming decades. Hydraulic power is a national renewable resource, unaffected by geopolitical problems, and above all, non polluting. Many countries with their own hydraulic resources in both the industrialized and the developing world have expressed needs for the development of small hydroelectric plants. Hidroenergia 91 Conference is the opportunity to take stock of knowledge gained in the vast field of small hydroelectric plants. The meeting is divided into four subjects: 1 methods for decision aid; 2 environmental impact and accompanying answers; 3 national development policy; 4 world market and international cooperation. This meeting contains 75 papers, 8 papers are in the INIS scope and 72 papers are in the ENERGY DATA BASE scope

  4. Competitive analysis of small hydroelectric power plants

    International Nuclear Information System (INIS)

    Assad, L.S.; Placido, R.

    1990-01-01

    The agreement between CPFL/UNICAMP/EFEI for developing energetic planning of Small Hydroelectric Power Plants construction is described. Some notions for showing the more economic alternative between decide by Small Hydroelectric Power Plants construction and continue supply the market by inter ligated system generation are shown in this stage of the agreement. (author)

  5. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  6. Small hydroelectric power plant in Bistra

    OpenAIRE

    Mravinec, Peter

    2013-01-01

    Energetics is extremely important for humanity and its development. In Slovenia, a third of all electric energy comes from hydroelectric power plants. This form of electricity generation is environmentally friendly as it does not contribute to global warming and climate change since it does not emit greenhouse gasses. During their course of schooling, Slovenian pupils are taught about power plants at several different subjects but never go in detail and therefore fail to see the big pictur...

  7. The greatest hydroelectric power plant in the world. Itaipu Hydroelectric Power Plant

    International Nuclear Information System (INIS)

    Andonov - Chento, Ilija

    2004-01-01

    Details to demonstrate the size and engineering achievements of one of the world's greatest hydroelectric power plant are given. Principal technical features of construction and operation of the Itaipu Dam are tabulated and discussed

  8. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  9. Hydroelectric power plants may influence profit of company

    International Nuclear Information System (INIS)

    Regula, E.

    2006-01-01

    In this interview with divisional manager of the Division of control of operation of hydroelectric power plants of the Slovenske elektrarne, a.s. Mr. Milan Chudy is published. The effectiveness and its optimisation in hydroelectric power plants of the Slovenske elektrarne, a.s. are discussed

  10. Environmental requirements at hydroelectric power plants

    International Nuclear Information System (INIS)

    Cada, G.F.

    1993-01-01

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour

  11. Risks in the operation of hydroelectric power plants and nuclear power in Brazil

    International Nuclear Information System (INIS)

    Goldemberg, J.

    1986-01-01

    A comparison between the utilization of electrical energy generated by hydroelectric power plant and nuclear power plant is made. The risks from nuclear installations and the environmental effects of hydroelectric power plants and nuclear power plants are presented. (E.G.) [pt

  12. Micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to characterise the state of ten Micro Hydroelectric Power Plants (MHPPs) installed in the west region of Cameroon, in preparation for their modernization. The work was carried out between January 2006 and December 2008. Each site was visited at least once a month. During these ...

  13. Recomposition of the region affected by Ita hydroelectric power plant

    International Nuclear Information System (INIS)

    Martins, L.R.C.M.

    1993-01-01

    The construction of Ita hydroelectric power plant will dismantle a complex urban texture, rural, social and roads, that is fixed in this territory and time. They need for a special treatment and have to be considered like investment. The environment impacts, the changes in ecosystems, the changes in communities and energy problem that a relocation will cause are presented. (C.M.)

  14. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power... BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of...

  15. Pumped storage hydroelectric power plant Cierny Vah

    International Nuclear Information System (INIS)

    2006-01-01

    This leaflet describes the Enterprise Cierny Vah Pumped storage hydropower plants of the joint stock company Slovenske elektrarne, a.s. (Cierny Vah PSHP). Cierny Vah PSHP has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system (ES). It is mainly the pumped storage hydro power plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation but especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control,...) gave way to dynamic functions which gained greater importance (sudden load changes control of ES, immediate meeting of the daily load diagram, frequency control and outputs given in ES, etc.) After interconnection of our ES with the UCPTE West European association in which there are besides other things, the strict criteria for observing balance of outputs, the main functions of PSPs are as follows: 1. Dynamic services for ES 2. Dispatching reserve for the fall out of the greatest ES block 3. Observing the foreign cooperation balance agreed 4. Compensation of peaks and also of sudden daily load diagram reductions. All the work is divided into four parts from the building point of view: The upper reservoir is an artificial one without the natural water inflow, built by excavation and slope on an Unknown elevation more than 1.150 m above sea level. A leading slope with a gradient 1:2 and a bottom of the reservoir

  16. THE MODEL OF REGION APPLICABILITY OF A SMALL HYDROELECTRIC POWER PLANT IN SLOVAKIA

    OpenAIRE

    Brestovič, Tomáš; Jasminská, Natália; Kubik, Michal; Schvarzbacherová, Eva

    2012-01-01

    The Small hydroelectric power plant (HPPs) is usually not associated with negative impacts on the environment within their operation and construction. To produce electricity, hydroelectric power plants make use of the hydroelectric power potential of rivers (HP), which is the product of mean flow rates and heads of a particular river stretch. The big advantage is that they are decentralized energy sources. In addition they can be installed in remote areas where they can provide op...

  17. Production costs: U.S. hydroelectric power plants, 4th Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The book provides 1991 operation and maintenance expenses for over 800 conventional and pumped-storage hydroelectric power plants. Report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, O ampersand M expenses, total production costs and current plant capitalization. Fifty eight percent of the utility-owned hydroelectric plants in the US are covered by this report. Data diskette provides additional capital and production cost accounts and number of employees for each plant

  18. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    OpenAIRE

    Krstić Dušan B.; Zlatković Slobodan M.; Domazet Milka Đ.; Vuksanović Dejan M.

    2016-01-01

    By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik) building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned...

  19. Production capacity of equipment for medium and large hydroelectric power plant in China

    Energy Technology Data Exchange (ETDEWEB)

    Huang Shenyang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents an overview on the production capacity of equipment for medium and large hydroelectric power plant in China. The document approaches general aspects, production capability and testing facilities related to Francis, Kaplan, tubular and impulse hydroelectric generating sets, and the introduction of main manufacturers as well.

  20. Ecological impact from large constructions of hydroelectric power plants in Parana River, Brazil

    International Nuclear Information System (INIS)

    Bonetto, Argentino A.

    1992-01-01

    An analysis over environmental impacts on Parana River as a result of the hydroelectric power plants construction is presented. Hydroelectric dams, also including the planned ones, are showing during the explanation, and biologic aspects are discussed. 30 refs., 4 figs., 2 tabs

  1. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  2. Hydroelectric Power Plants ’ Re Servoirs And Their Impact On The Environment

    OpenAIRE

    Balzannikov, M. I.; Vyshkin, E. G.

    2015-01-01

    The paper presents the analysis of different types of impact the hydroelectric power plants’ reservoirs could make on the environment. Hydroelectric power plants (HPP) produce ecologically safe energy and correspond to the modern striving for sustainability because they are operated on renewable energy sources. At the same time they can provoke various potential dangers for the environment. The objective of the investigation is to demonstrate the interrelation between the type and structure o...

  3. Hydroelectric power and privatisation

    International Nuclear Information System (INIS)

    Frankovic, B.

    2000-01-01

    The paper considers privatisation aspects of both the existing hydroelectric power plants presently owned by the Croatian state and those to be built in the future. The paper highlights the water power utilisation as just one of the possible purposes of water and land resources development, which are the most important segment of the physical development of the Croatian territory, and the fact that water and land are public wealth. (author)

  4. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  5. micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    the west region of Cameroon. KEYWORDS: Problems, micro hydroelectric, funds, craftsmen, Cameroon. INTRODUCTION. Energy from Water streaming down the mountains has been exploited since antiquity to replace muscular effort (Bessac, 2000). The perfection of devices used results today in hydroelectric turbines,.

  6. Hydroelectric power plant with variable flow on drinking water adduction

    Science.gov (United States)

    Deaconu, S. I.; Babău, R.; Popa, G. N.; Gherman, P. L.

    2018-01-01

    The water feeding system of the urban and rural localities is mainly collected with feed pipes which can have different lengths and different levels. Before using, water must be treated. Since the treatment take place in the tanks, the pressure in the inlet of the station must be diminished. Many times the pressure must be reduced with 5-15 Barr and this is possible using valves, cavils, and so on. The flow capacity of the water consumption is highly fluctuating during one day, depending on the season, etc. This paper presents a method to use the hydroelectric potential of the feed pipes using a hydraulic turbine instead of the classical methods for decreasing the pressure. To avoid the dissipation of water and a good behavior of the power parameters it is used an asynchronous generator (AG) which is coupled at the electrical distribution network through a static frequency converter (SFC). The turbine has a simple structure without the classical devices (used to regulate the turbine blades). The speed of rotation is variable, depending on the necessary flow capacity in the outlet of the treatment station. The most important element of the automation is the static frequency converter (SFC) which allows speeds between 0 and 1.5 of the rated speed of rotation and the flow capacity varies accordingly with it.

  7. Assessment and statistics of Brazilian hydroelectric power plants: Dam areas versus installed and firm power

    International Nuclear Information System (INIS)

    Caetano de Souza, Antonio Carlos

    2008-01-01

    The Brazilian relief, predominantly composed by small mountains and plateaus, contributed to formation of rivers with high amount of falls. With exception to North-eastern Brazil, the climate of this country are rainy, which contributes to maintain water flows high. These elements are essential to a high hydroelectric potential, contributing to the choice of hydroelectric power plants as the main technology of electricity generation in Brazil. Though this is a renewable source, whose utilized resource is free, dams must to be established which generates a high environmental and social impact. The objective of this study is to evaluate the impact caused by these dams through the use of environmental indexes. These indexes are ratio formed by installed power with dam area of a hydro power plant, and ratio formed by firm power with this dam area. In this study, the greatest media values were found in South, Southeast, and Northeast regions respectively, and the smallest media values were found in North and Mid-West regions, respectively. The greatest encountered media indexes were also found in dams established in the 1950s. In the last six decades, the smallest indexes were registered by dams established in the 1980s. These indexes could be utilized as important instruments for environmental impact assessments, and could enable a dam to be established that depletes an ecosystem as less as possible. (author)

  8. constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    equipped continent in the domain of energy; less than 5% of the inhabitants of countries in south of the Sahara have access to electricity (Sokon and. Thomas, 1997). The economic crisis that rages in this region does not permit an improvement of energy with large hydroelectric power or thermal plants. Thus numerous rural ...

  9. Vulnerability of the hydro-electric power plants to the impacts of ...

    African Journals Online (AJOL)

    Vulnerability of the hydro-electric power plants to the impacts of climate change in Rwanda: Community baseline. ... The survey also revealed heavy dependency on fuel wood and kerosene for energy and this entail continuous cutting of trees and thus degrading the environment. The mitigation measures being ...

  10. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M.; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  11. Constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to study the constraints of Micro Hydroelectric Power Plants (MHPPs) installed in the West Region of Cameroon. The study was carried out between January 2005 and December 2008 and is related to water conveyance structures, production facilities; transportation and distribution ...

  12. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  13. Estimation of small-scale hydroelectric power plant costs

    International Nuclear Information System (INIS)

    Santos, Afonso Henriques Moreira; Silva, Benedito Claudio da; Magalhaes, Ricardo Nogueira

    2010-01-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  14. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    Science.gov (United States)

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  15. Yield of the Hydroelectric Power Plant using Feed Forward and Recurrent Neural Networks: Hirfanlı Dam Application Example

    OpenAIRE

    OZBAY KARAKUS, Mucella; ALTIN, Cemil

    2014-01-01

    The yield variety of the hydroelectric power plants according to the fall and flow changes depending on climatic conditions was investigated. For this purpose, Hirfanlı Hydroelectric Power Plant in Kaman where is the district of Kırşehir was selected as the sampling plane. The water consumption, decreased the flow of water to energy ratio, yield such data in 2008 from Hirfanlı Hydroelectric Power Plant and this data changes in the amount of precipitation, climate data were taken from the Kama...

  16. Herpetofauna, Espora Hydroelectric Power Plant, state of Goiás, Brazil.

    Directory of Open Access Journals (Sweden)

    Vaz-Silva, W.

    2007-01-01

    Full Text Available We provide a checklist of the herpetofaunal assemblage from Espora Hydroelectric Power Plant region(UHE Espora, southwestern of the state of Goiás, Brazil. Representatives of 32 amphibian and 71 reptile species wereobtained during faunal monitoring and faunal rescue programs carried out in the study area. The obtained species listand distribution records are here discussed in an attempt to improve the still limited knowledge on Cerradoherpetofaunal assemblages.

  17. Using fire dynamics simulator to reconstruct a hydroelectric power plant fire accident.

    Science.gov (United States)

    Chi, Jen-Hao; Wu, Sheng-Hung; Shu, Chi-Min

    2011-11-01

    The location of the hydroelectric power plant poses a high risk to occupants seeking to escape in a fire accident. Calculating the heat release rate of transformer oil as 11.5 MW/m(2), the fire at the Taiwan Dajia-River hydroelectric power plant was reconstructed using the fire dynamics simulator (FDS). The variations at the escape route of the fire hazard factors temperature, radiant heat, carbon monoxide, and oxygen were collected during the simulation to verify the causes of the serious casualties resulting from the fire. The simulated safe escape time when taking temperature changes into account is about 236 sec, 155 sec for radiant heat changes, 260 sec for carbon monoxide changes, and 235-248 sec for oxygen changes. These escape times are far less than the actual escape time of 302 sec. The simulation thus demonstrated the urgent need to improve escape options for people escaping a hydroelectric power plant fire. © 2011 American Academy of Forensic Sciences.

  18. Modernization of hydroelectric power plants control and supervisory systems; Modernizacao de sistemas de supervisao e controle de usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Baroukh, Aron; Oliveira Neto, Orlando F. de; Ferreira, Alexandre J.R. [Alston, Sao Paulo, SP (Brazil). E-mail: aron.baroukh@tde.alstom.com

    1999-07-01

    This work shortly describes some ALSTOM experiences in services of hydroelectric power plants control and supervisory systems modernization. It also approaches the advantages of the modernization, the special cares to be taken and study cases of projects presently being developed.

  19. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  20. Combined solar photovoltaic and hydroelectric pumped storage power plant

    International Nuclear Information System (INIS)

    Gzraryan, R.V.

    2009-01-01

    Combined model of solar photovoltaic and pumped storage stations aimed at power supply for 40 rural houses are considered. The electric circuits of station and their acting regularities are developed and submitted. The both generation curve of photovoltaic station and load curve of electrical customer are considered. The power of hydraulic unit, pumping unit and photovoltaic station are calculated

  1. The new small hydroelectric power plant 'Faltenbach' in Oberstdorf in Allgaeu; Das neue Kleinwasserkraftwerk ''Faltenbach'' in Oberstdorf im Allgaeu

    Energy Technology Data Exchange (ETDEWEB)

    Hamerak, Kurt

    2013-06-01

    Recently, in Oberstdorf (Federal Republic of Germany) the hydroelectric plant 'Faltenbach' was put in operation. This hydroelectric power plant covers nearly the half of the electrical base load energy demand of this community. The author of the contribution under consideration reports on the construction of this hydroelectric power plant, restoration measures and technical data of the power plant, turbine and the generator.

  2. Impact of the reservoir of Paraibuna Hydroelectric Power Plant, SP, Brazil

    Directory of Open Access Journals (Sweden)

    Suely Franco Siqueira Lima

    2010-12-01

    Full Text Available Artificial reservoirs for hydroelectric power plants cause significant environment and social changes. This paper describes the construction of a geospatial database with information on the impacts caused by the Paraibuna hydroelectric power plant since its construction. CBERS-2 and Landsat 5 and 7 images were included in the database, and then, analyzed to provide information on land cover and land use for a period of 31 years. Information provided by São Paulo Energy Company (CESP and the Paraíba do Sul Water Basin Management Association (AGEVAP was integrated into this database. Interactive database queries allow the assessment of changes in the local economy around the reservoir, changes in land cover, loss of historical and environmental assets and also the actions of the energy company to minimize the plant and reservoir impacts. This database provides information that helps analyzing the potential and limits of Paraibuna Power Plant and addresses the impacts to the natural landscape and to the social and economic resources of the affected region.

  3. Improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    Hydroelectric power is a renewable source of energy. By principle, hydroelectric power generation relies on the law of conservation of energy where kinetic energy that resulted from the movement of the mass of water from the river is translated into electr icity, the quantum of which depends on systemic variables viz: plant ...

  4. improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    HOD

    Hydroelectric power is a renewable source of energy. By principle, hydroelectric power generation relies on the law of conservation of energy where kinetic energy that resulted from the movement of the mass of water from the river is translated into electricity, the quantum of which depends on systemic variables viz: plant ...

  5. Hydroelectric power stations and ecological energy policy

    International Nuclear Information System (INIS)

    Novakova, R.

    1993-01-01

    The report discusses the place of hydroenergy in solving the power and ecological problems of Bulgaria: level of building up of the hydroelectric capacity of the country; possibilities for new hydro electric construction; environmental problems of design, construction and operation of the hydroelectric units; advantages of the hydroelectric engineering. The possibilities of the hydroelectric power plants as an alternative of the other more or less conventional electicity producers are shown in order to help in decision making as regards the problems of the economic, power and environmental crisis. (author)

  6. Influence of the Amazon Hydrological Regime on Eutrophication Indicators of a Hydroelectric Power Plant Reservoir.

    Science.gov (United States)

    Freire, Jean Carlos A; Hauser-Davis, Rachel Ann; da Costa Lobato, Tarcísio; de Morais, Jefferson M; de Oliveira, Terezinha F; F Saraiva, Augusto Cesar

    2017-05-01

    Dam constructions in the Amazon have increased exponentially in the last decades, causing several environmental impacts and serious anthropogenic impacts in certain hydroelectric power plant reservoirs in the region have been identified. The assessment of the trophic status of these reservoirs is of interest to indicate man-made changes in the environment, but must take into account the hydrological cycle of the area. This can be relevant for environmental management actions, aiding in the identification of the ecological status of water bodies. In this context, physico-chemical parameters and eutrophication indicators were determined in a hydroelectric power plant reservoir in the Brazilian Amazon to assess trophic variations during the regional hydrological regime phases on the reservoir, namely dry, filling, full and emptying stages. The local hydrological regimes were shown to significantly influence TSS and turbidity, as well as NH 4 , NO 3 , PO 4 , with higher values consistently observed during the filling stage of the reservoir. In addition, differences among the sampling stations regarding land use, population and anthropogenic activities were reflected in the PO 4 3- values during the different hydrological phases.

  7. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  8. Operator training for the Yacyreta binational hydroelectric power plant; Formacion de operadores para la Central Hidroelectrica de Yacireta

    Energy Technology Data Exchange (ETDEWEB)

    Dure, Francisco; Tachella, Heriberto [Entidad Binacional Yacyreta, Isla Yacireta (Paraguay). Central Hidroelectrica Yacyreta]. E-mail: yacyreta@internet.siscotel.com

    1998-07-01

    This work is oriented to the power plant operators, by exposing the criteria and methods adopted for operators selection, training and incorporation to the Yacyreta Hydroelectric Power Plant. The used criteria considered some aspects, as follows: the operation staff should be consisted of equal numbers of Argentine and Paraguayan nationalities, viewing the both systems operation; experience of the shift supervisors in operating a plant for a minimum of 10 years; the supervisors should participate training the auxiliary operators.

  9. The hydroelectric power market in the world

    International Nuclear Information System (INIS)

    Junius, A.

    2004-10-01

    This work makes a synthesis of the hydroelectric power market, of its present day capacity in the world, and of its perspectives of development in the future. The first part treats of the hydroelectric facilities and of the market of hydroelectric power plants. It presents the technology used and the different types of plants, the evolution of their geographical setting and the future potentialities of development. The second part deals with the competitiveness of this industry with respect to: the energy policy stakes, the profitability, the energy independence of countries, the regulation of power networks and the environmental impacts. (J.S.)

  10. A contribution to the methods of determining the optimal exploitation of hydraulically related hydroelectric power plants of different owners

    International Nuclear Information System (INIS)

    Gievski, Igor

    2013-01-01

    For the purpose of solving the water-supply and energy-related problems of the city of Skopje, the need has arisen to construct the 'Skopsko Pole' hydro system. The 'Skopsko Pole' hydro system consists of the power plants 'Kozjak', 'SvetaPetka' and 'Matka'. It is envisioned to use the watercourse of the Treska River and has been envisaged as a multipurpose system, that is, as an anti-flood system, system for irrigation of agricultural land and an electricity producer. Certainly, the meeting of the aforementioned needs will depend on the hydrological potential of the Treska River, which is why an exact and detailed review of the hydrological potential of the Treska River is of vital importance. It is a complex task to determine the optimal work of the hydroelectric power plants built along the same river, even if this is about the so-called run-of-the-water hydroelectric power plants, given the different interests of the water consumers of the same watercourse. This problem will become more complicated if one or more (that is, all) hydroelectric power plants have their own accumulative pools. In this case, the question arises of how the waters of each of the accumulations should be used. During this, we need to bear in mind the fact that every release of water from each of the accumulations alters the elevation points of all the hydroelectric power plants on the same watercourse and thus affects their production and eventually the benefit of their work. With the restructuring of the electric energy systems in different countries over the past 20 years, the vertically integrated power plants have been converted into horizontally integrated ones. In many cases, it is different companies that are the electricity producers, the high-voltage electricity transmitters, and the medium- and low-voltage electricity distributors. Some of these companies are private companies, whereas others are state-owned. Such diverse

  11. Project final report: Energetic planning focusing small scale hydroelectric power plants; Relatorio final. Projeto planejamento energetico com enfase em pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Yara dos Santos

    1994-12-31

    Considering the increasing need for a better utilization of the Brazilian hydric resources, a deeper analysis of small scale hydroelectric power plants has been demanding. This work presents a case study of energetic planning based upon small scale hydroelectric power plants in a district of Amazon state - North Brazil 8 refs., 11 figs., 19 tabs.

  12. An Investigation of Health and Safety Measures in a Hydroelectric Power Plant.

    Science.gov (United States)

    Acakpovi, Amevi; Dzamikumah, Lucky

    2016-12-01

    Occupational risk management is known as a catalyst in generating superior returns for all stakeholders on a sustainable basis. A number of companies in Ghana implemented health and safety measures adopted from international companies to ensure the safety of their employees. However, there exist great threats to employees' safety in these companies. The purpose of this paper is to investigate the level of compliance of Occupational Health and Safety management systems and standards set by international and local legislation in power producing companies in Ghana. The methodology is conducted by administering questionnaires and in-depth interviews as measuring instruments. A random sampling technique was applied to 60 respondents; only 50 respondents returned their responses. The questionnaire was developed from a literature review and contained questions and items relevant to the initial research problem. A factor analysis was also carried out to investigate the influence of some variables on safety in general. Results showed that the significant factors that influence the safety of employees at the hydroelectric power plant stations are: lack of training and supervision, non-observance of safe work procedures, lack of management commitment, and lack of periodical check on machine operations. The study pointed out the safety loopholes and therefore helped improve the health and safety measures of employees in the selected company by providing effective recommendations. The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.

  13. Synanthropy of mosquitoes and sand flies near the Aimorés hydroelectric power plant, Brazil.

    Science.gov (United States)

    Barata, R A; Ursine, R L; Nunes, F P; Morais, D H; Araújo, H S

    2012-12-01

    The environmental changes resulting from the construction of hydroelectric dams may affect the fauna of insect vectors and consequently the epidemiology of the diseases they transmit. This work examined the mosquito and sand fly fauna in the area of the Aimorés hydroelectric power plant, analyzing the seasonal distribution and the degree of species synanthropy in different ecotopes. Between November, 2008 and September, 2009, entomological captures were performed with the help of HP light traps in the rural, urban, and forest areas of Aimorés, Ituêta, Resplendor, and Baixo Guandu counties. The fauna proved to be quite diversified. Twenty-two species of mosquitoes and 11 species of sand flies were found. Culex quinquefasciatus was predominant among mosquitoes (76.7%), while Lutzomyia intermedia prevailed among sand flies (34.5%). Some of the captured species have medical interest. Supported by the high degree of synanthropy, those species reinforce the need for epidemiological surveillance. © 2012 The Society for Vector Ecology.

  14. Herpetofauna, Santa Edwiges I and II hydroelectric power plants, state of Goiás, Brazil

    Directory of Open Access Journals (Sweden)

    Cintra, C. E. D.

    2009-01-01

    Full Text Available This paper presents a check list of amphibians and reptiles of the area under the influence of Santa Edwiges I and IIsmall hydroelectric power plants on Rio Buritis, state of Goiás, Brazil. The list was the result of faunal rescueoperations carried out between 31 August and 29 September 2005 (Santa Edwiges II and between 30 July and 12September 2006 (Santa Edwiges I. The list comprises 30 species of amphibians belonging to 16 genera and 8 families(Caeciliidae, Bufonidae, Cycloramphidae, Hylidae, Brachycephalidae, Leiuperidae, Leptodactylidae, andMicrohylidae, and 45 species of reptiles belonging to 38 genera and 16 families (Amphisbaenidae, Anguidae,Gekkonidae, Gymnophtalmidae, Polychrotidae, Scincidae, Teiidae, Tropiduridae, Anomalepididae, Leptotyphlopidae,Typhlopidae, Boidae, Colubridae, Dipsadidae, Elapidae, and Viperidae.

  15. The role of hydroelectric power and contribution of small hydropower plants for sustainable development in Turkey

    International Nuclear Information System (INIS)

    Dursun, Bahtiyar; Gokcol, Cihan

    2011-01-01

    Turkey is a rapidly growing country regarding its economy and population and therefore has a large and continuously increasing energy demand. Turkey mostly meets its energy demand from imported fossil sources. However apart from petroleum and natural gas, Turkey has almost all kinds of energy resources and hence it would not need to meet its energy demand through import. In addition, Turkey has very large potential of hydraulic energy but to date only one-third of this significant economical potential could be used. This ratio seems insufficient when compared with that of European countries. In this paper the role of hydroelectric power, its potential and its present status are investigated in detail for Turkey. Especially the small scale hydropower plant is emphasized as Turkey's renewable energy source. Furthermore the water resources of Turkey are examined. (author)

  16. Watermill and Small-Scale Hydroelectric Power Plant Landscapes Assessed According to Ecological Aspects

    Directory of Open Access Journals (Sweden)

    Lilita Lazdāne

    2013-10-01

    Full Text Available Research of watermill and small-scale hydroelectric power plant (HPP landscapes in Latvia according to ecological aspects is a part of a more complex research. The aim of this research is to examine the existing situation of watermill and small-scale HPP landscapes in Latvia by applying the ecological assessment criteria, and then try to formulate a definition of common tendencies of the landscape character. This paper provides a landscape inventory matrix for research in the field stu­dies of landscape identification at the local planning level. The duration of the research was from 2010 to 2012. The research includes 42 territories starting with the three most densely developed areas in Latvia: in Latgale, Kurzeme and Vidzeme uplands distribution ranges. The research results reflect tendencies of the landscape features assessed according to the previously developed criteria of ecological aspects.

  17. Small Scale Hydroelectric Power Plants in Norway. Some Microeconomic and Environmental Considerations

    Directory of Open Access Journals (Sweden)

    Johannes Idsø

    2017-06-01

    Full Text Available The development of small-scale hydroelectric power plants in Norway is determined by natural conditions, policies, attitudes and property rights. The owner of the river is the central decision maker. It is he/she who decides whether he/she will develop the power plant himself/herself, whether he/he wants to enter into a contract with an external investor and let him/her develop the power plant, whether he/she will sell his/her property rights or postpone the decisions. All available choices will involve risk. In order for him/her to make the best choice, he/she must find the certainty equivalent to each of the choices and choose the one with the highest certainty equivalent. To find the certainty equivalent, we use the utility theory of John von Neumann and Oskar Morgenstern. The owner of the river makes the decision that gives him/her the greatest utility when both economic and non-economic effects are assessed within the opportunity set made by the local and the central authorities.

  18. Environmental Impact Report from Santa Rita Hydroelectric Power Plant (Minas Gerais State - Brazil): technical strategic for its elaboration

    International Nuclear Information System (INIS)

    Souza, J.A. de; Marques Neto, F.P.

    1989-01-01

    The steps for developing the technical strategies used on the elaboration of Environmental Impact Report from Santa Rita Hydroelectric Power Plant, Minas Gerais State, are described, including the influence area, technical requirements, impact identification, technical selection of mitigative measures, impact meaning and strategy for evaluating the identified impacts. (C.G.C.)

  19. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  20. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  1. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  2. RECOVERY OF AN OXISOL DEGRADED BY THE CONSTRUCTION OF A HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Joseane Carina Borges de Carvalho

    2015-12-01

    Full Text Available ABSTRACT The removal of thick layers of soil under native scrubland (Cerrado on the right bank of the Paraná River in Selvíria (State of Mato Grosso do Sul, Brazil for construction of the Ilha Solteira Hydroelectric Power Plant caused environmental damage, affecting the revegetation process of the stripped soil. Over the years, various kinds of land use and management systems have been tried, and the aim of this study was to assess the effects of these attempts to restore the structural quality of the soil. The experiment was conducted considering five treatments and thirty replications. The following treatments were applied: stripped soil without anthropic intervention and total absence of plant cover; stripped soil treated with sewage sludge and planted to eucalyptus and grass a year ago; stripped soil developing natural secondary vegetation (capoeira since 1969; pastureland since 1978, replacing the native vegetation; and soil under native vegetation (Cerrado. In the 0.00-0.20 m layer, the soil was chemically characterized for each experimental treatment. A 30-point sampling grid was used to assess soil porosity and bulk density, and to assess aggregate stability in terms of mean weight diameter (MWD and geometric mean diameter (GMD. Aggregate stability was also determined using simulated rainfall. The results show that using sewage sludge incorporated with a rotary hoe improved the chemical fertility of the soil and produced more uniform soil pore size distribution. Leaving the land to develop secondary vegetation or turning it over to pastureland produced an intermediate level of structural soil quality, and these two treatments produced similar results. Stripped soil without anthropic intervention was of the lowest quality, with the lowest values for cation exchange capacity (CEC and macroporosity, as well as the highest values of soil bulk density and percentage of aggregates with diameter size <0.50 mm, corroborated by its lower

  3. Occupational allergy after exposure to caddis flies at a hydroelectric power plant.

    Science.gov (United States)

    Kraut, A; Sloan, J; Silviu-Dan, F; Peng, Z; Gagnon, D; Warrington, R

    1994-01-01

    A cross sectional survey was conducted in a hydroelectric power plant in which the workforce was exposed to large numbers of caddis flies. 28 of 57 employees participated. About 50% of the participants reported work related eye, nose, and sinus symptoms and wheezing. Working in locations with greater exposure to caddis flies was significantly associated with work related symptoms. 17 workers (61%) were skin prick positive to a laboratory prepared caddis fly antigen (LCFA) made from the remains of caddis flies present in the plant and 11 (39%) had positive reactions to a commercial caddis fly antigen (CCFA). Workers stationed in heavily exposed areas were 3.7 times as likely to have a positive response to the LCFA (p = 0.009) and 5.3 times as likely to have a positive response to the CCFA (p = 0.036). 13 (46%) of survey respondents reported three or more work related symptoms. 10 (91%) CCFA positive workers reported three or more work related symptoms. Pulmonary function studies revealed slight, but not significantly decreased forced vital capacity (FVC), forced expiratory volume in one second (FEV1), and FEV1/FVC ratios in workers who were skin test positive to either caddis fly preparation when compared with those who were negative. One worker who was skin test positive to both antigens had a cross shift fall in FEV1 of 20% predicted. Occupational allergy to caddis flies proved to be a significant health problem at this work site. PMID:8044233

  4. Ecological improvements to hydroelectric power plants under EEG. Guidance to environmental verifiers and water rights authorities

    International Nuclear Information System (INIS)

    Meyr, Christoph; Pfeifer, Hansjoerg; Schnell, Johannes; Hanfland, Sebastian

    2011-11-01

    The use of hydropower as a renewable form of energy is experiencing a renaissance due to the energy transition in Bavaria. The fishery evaluate not uncritically this development, because hydroelectric plants generally normally represent a considerable intervention in water and therefore in the habitat of the fish. In this case it should be noted that just often not even the minimum requirements of ecology are fulfilled at existing plants according to the Federal Water Act. [de

  5. The Effect of Hydroelectric Power Plants (hpp) on Agro-Life at Rural Land Regulation in Turkey

    Science.gov (United States)

    Onursal Denli, G.; Denli, H. H.; Seker, D. Z.; Bitik, E.; Cetin, S.

    2014-12-01

    Turkey is one of the self-sufficient in foodstuffs and globally ranks as 7th significant agricultural exporter in the world. Main trading partners are the European Union, the United States and the Middle East. As known, agricultural production is dependent on factors including efficient and effective use of all inputs ranging from those natural resources as in land and water to well-trained human resources as labour at the production. The socio-economic aspects of this sector take several forms ranging from the incomes of the primary producers. Rural land regulation is a necessity for rural areas and is regarded as a useful instrument for improving farmer's incomes and life standards. The irrigation system, established during the rural regulation/land consolidation period of large-scale farming, is insufficiently adjusted to the new land tenure structures. The government is especially in the process of water management with hydroelectric power plants. This process produces energy that is required but effects negatively the rivers and agricultural, environmental, climatic conditions. Rivers are vessels of the nature. Free flowing rivers give life to all nature. Most of the studies indicate that Hydroelectric Power Plants (HPP) affects the surface and ground-water management, natural life, agricultural productivity, socio-economic situation at agricultural regions and agro-life related with immigration. This study emphasizes the effect of Hydroelectric Power Plants which are used in transformation of water as a renewable natural resource into electricity power from the perspective of environmental policies and rural regulation.

  6. EVALUATION OF OPTIONS FOR ERECTING SMALL HYDROELECTRIC POWER PLANTS ON THE RIVER BYSTRZYCA PÓŁNOCNA

    Directory of Open Access Journals (Sweden)

    Andrzej Mazur

    2016-11-01

    Full Text Available This paper contains an analysis of conditions for erecting small hydroelectric power plants on the selected river in Lublin Region. The analysis covers technical options of the location of the facilities and their energy potential split into theoretical and technical potential. In addition, it refers to the most important legislative acts governing water management, including environmental protection. According to the analysis, the technical potential of small hydroelectric power plants on the river Bystrzyca Północna is about 125.5 kW. Energy production capacity is limited by both hydrological conditions and the necessity to adapt to regulatory framework concerning nature and environment protection, superior functions of watercourses and their situation in agricultural land.

  7. Evaluation of environmental impacts caused by hydroelectric power plants in native forest areas and mitigation measures

    International Nuclear Information System (INIS)

    Ramalho, Cyro Pinheiro

    1992-01-01

    The following work has the intention of demonstrating the importance of native forest to the human life, not only through its inherent qualities as something to preserve, but also as a source of great resources, and in particular hydroelectric resource that, by today's necessities are bounded to be explored. The negative effects caused by the implementation of a hydroelectric plant are shown together with the necessity of adoption of measures that would soften the environment impact of it. For the adoption of those measures, many forest studies were proposed in the search for its complete characterization. Each of these studies are duly defined and presented in their general and specific goals. The most adequate methodology is finally recommended. (author). 14 refs

  8. Fish population genetic structure shaped by hydroelectric power plants in the upper Rhine catchment.

    Science.gov (United States)

    Gouskov, Alexandre; Reyes, Marta; Wirthner-Bitterlin, Lisa; Vorburger, Christoph

    2016-02-01

    The Rhine catchment in Switzerland has been transformed by a chain of hydroelectric power stations. We addressed the impact of fragmentation on the genetic structure of fish populations by focusing on the European chub (Squalius cephalus). This fish species is not stocked and copes well with altered habitats, enabling an assessment of the effects of fragmentation per se. Using microsatellites, we genotyped 2133 chub from 47 sites within the catchment fragmented by 37 hydroelectric power stations, two weirs and the Rhine Falls. The shallow genetic population structure reflected drainage topology and was affected significantly by barriers to migration. The effect of power stations equipped with fishpasses on genetic differentiation was detectable, albeit weaker than that of man-made barriers without fishpasses. The Rhine Falls as the only long-standing natural obstacle (formed 14 000 to 17 000 years ago) also had a strong effect. Man-made barriers also exacerbated the upstream decrease in allelic diversity in the catchment, particularly when lacking fishpasses. Thus, existing fishpasses do have the desired effect of mitigating fragmentation, but barriers still reduce population connectivity in a fish that traverses fishpasses better than many other species. Less mobile species are likely to be affected more severely.

  9. Monitoring of surge tanks in hydroelectric power plants using fuzzy control; Ueberwachung von Wasserschloessern in Wasserkraftwerken mit Fuzzy-Control

    Energy Technology Data Exchange (ETDEWEB)

    Lin, J.C.

    2000-07-01

    Surge tanks are used to reduce pressure variations caused by fluid transients in high-head hydroelectric power plants. Occasionally load increases have to be limited to prevent the surge tank from draining due to excessive demands of flow. A control concept based on fuzzy logic was developed for governing the load changes of hydroelectric power plants. In order to achieve an optimal control behaviour and simultaneously to avoid the draining of surge tanks, the speed of load increases is automatically adjusted by a fuzzy conclusion depending on the height and the gradient of the water level in the surge tank, the reservoir level and the sum of load increases. The hydroelectric power plant Achensee of Tiroler Wasserkraftwerke AG in Austria is taken as an example to demonstrate the characteristics of the control concept. In comparison with a conventional control concept, the operation of load increases using the fuzzy concept proves to be more flexible and unrestricted. (orig.) [German] Ein Wasserschloss dient zur Verminderung von Druckschwankungen im Wasserfuehrungssystem von Hochdruckanlagen. Gelegentlich muss man die Lastaufnahme so beschraenken, dass das Wasserschloss nicht durch uebermaessige Wasserentnahme leerlaeuft. Fuer die Leistungsregelung eines Wasserkraftwerks wurde ein Konzept entwickelt, das auf der Fuzzy-Control in Verbindung mit der klassischen Regelung beruht. Um ein optimales Regelverhalten zu erhalten und gleichzeitig das Leerlaufen des Wasserschlosses zu vermeiden, wird die Geschwindigkeit der Lastaufnahme in Abhaengigkeit von der Hoehenkote und dem Gradienten des Wasserschlosspegels, dem Pegel des Oberwassers und der Groesse der geforderten Lasterhoehung automatisch eingestellt. Die Untersuchung erfolgt am Beispiel des Achenseekraftwerkes der Tiroler Wasserkraftwerke AG, Oesterreich. Im Vergleich mit einer konventionellen Regelung ergibt sich mit dem Fuzzy-Konzept eine flexiblere und freizuegigere Lastaufnahme. (orig.)

  10. Hydroelectric power generation in an Alpine basin: future water-energy scenarios in a run-of-the-river plant

    Science.gov (United States)

    Bongio, Marco; Avanzi, Francesco; De Michele, Carlo

    2016-08-01

    We investigate scenarios of hydroelectric power generation for an Alpine run-of-the-river plant in 2050. To this end, we include a conversion from streamflow to energy in a hydrological model of the basin, and we introduce a set of benchmark climate scenarios to evaluate expected future production. These are a "future-like-present" scenario assuming future precipitation and temperature inputs to be statistically equivalent to those observed during the recent past at the same location, a "warmer-future" scenario, which considers an additional increase in temperature, and a "liquid-only" scenario where only liquid precipitation is admitted. In addition, two IPCC-like climatic scenarios (RCP 4.5 and RCP 8.5) are considered. Uncertainty in glaciers' volume is accounted by initializing the hydrological model with two different inventories of glaciers. Ensemble results reveal that 1) an average decrease between -40% and -19% of hydroelectric power generation in 2050 is predicted at the plant considered (with respect to present condition); 2) an average decrease between -20% and -38% of cumulative incoming streamflow volume at the plant is also predicted, again with respect to present condition; 3) these effects are associated with a strong average decrease of the volume of glaciers (between -76% and -96%, depending on the initial value considered). However, Monte Carlo simulations show that results are also prone to high uncertainties. Implications of these results for run-of-the-river plants are discussed.

  11. Experience of Minas Gerais Energetic Company (CEMIG) in feasibility studies from hydroelectric power plants: energetic-economic studies

    International Nuclear Information System (INIS)

    Ramos, O.C.; Bras, A.J.F.; Batista Neto, R.P.; Salles Filho, M.P.

    1989-01-01

    The experience of Minas Gerais Energetic Company (CEMIG) - Brazil, on the use of dimensioning methodology for hydroelectric power plant from the Coordinated Group of Planning System was described, showing the problems with its use and the solutions, mainly the reservoir and the dimension of installed potential. It was concluded that the calculation procedures of the marginal costs for dimensioning, so as to become these costs more representative in future structure of the Brazilian generator park and less dependent to the oscillation due to conjuncture problems, must be re-evaluated. (C.G.C.). 7 refs, 3 figs, 1 tab

  12. Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' hydroelectric system into the power system of the Republic of Macedonia

    International Nuclear Information System (INIS)

    Rumenova, Evica; Naumoski, Kliment

    2001-01-01

    At the and of 1998, a study on conditions and possibilities of the 'Shara' hydroelectric system construction was prepared. The study considers an interesting idea for building up three reversible power plants. From electricity point of view the study emphasizes several significant issues that require comprehensive analyses in order to define the conditions and possibilities for their development. This paper attempts to give an overview of one of this issues: Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' - system into the power supply system of Republic of Macedonia. (Original)

  13. THE SIGNIFICANCE OF STRUCTURAL AND GEOLOGICAL RELATIONSHIP ASSESSMENT IN THE CONSTRUCTION OF THE OMBLA UNDERGROUND HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Renato Buljan

    1997-12-01

    Full Text Available The construction design of the underground hydroelectric plant Ombla required geological and structural investigations to he carried out. Due to past earthquakes in the area permanent tectonic movements were inferred. Therefore, in the wider and adjacent surroundings of the Ombla spring it was necessary to analyze the structural fabric and the geodynamic characteristics of the area. The most active zone encountered is the front part of a thrust fault belonging to the Dinaricum regional structural unit. The compressive regime is maintained as a response to the regional stress of an approximately S-N orientation. Different displacements of various parts of the Dinaricum unit are present. Along the rim of the structural blocks, the Hum-Om-bla fault zone extends, accompanied by left transcurrent faults, Through this zone the main groundwater drainage occurs supplying the Ombla spring. In the local Ombla spring area this zone is characterized by three sub-blocks and three major faults. The most important fault for the vital facilities of the Ombla hydroelectric power plant is the Pločice fault which divides the structural sub-blocks. Along this fault zone there are four mutually connected. The lowest two arc active groundwater draining systems supplying the Ombla spring. The data on local stress implies the following deformation of sub-blocks: sub-blocks 2c and 2f are displaced along normal faults from 20° to 30° to the left, downwards, while the sub-block 2 d is displaced along the Pločice thrust fault of 100° to 130° to the left, upwards. The structural data confirmed that the building of an underground dam with a height from 100 to 130 m was feasible. The connection between the caverns and the fault zone was determined. The unfavorable position of the active Pločice fault zone imposes the construction of vital Ombla power plant facilities underground.

  14. Badenian and Sarmatian beds in excavation pit for the hydroelectric power plant Brežice, Slovenia

    Directory of Open Access Journals (Sweden)

    Marijan Poljak

    2016-12-01

    Full Text Available Geological prospection of partly accessible constructional pit for the hydroelectric power plant (HPP Brežice was performed. Paleontological content and sediment-petrographic characteristics of rocks were investigated. Neogene part of the succession consists of carbonate silt and siltstone with intercalations of carbonate and silicate sandstone, and polymict sandstone to conglomerate. Based on foraminifera, ostracods, molluscs and marine mammals, the Upper Badenian and Lower Sarmatian age of beds and boundary between them have been determined. The transition is characterized by a shorter break in sedimentation and environmental change. Fossil fids indicate that salinity and depth of sedimentary basin were oscilating in Sarmatian, but in general decreasing. Quaternary cover beds consist of gravelly, sandy and silty deposits of the Sava River.

  15. Estimation of small-scale hydroelectric power plant costs; Estimacao de custos de PCH

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [MS Consultoria Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Silva, Benedito Claudio da [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Magalhaes, Ricardo Nogueira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil)

    2010-07-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  16. Flood Frequency Analysis Under Non-stationarity Conditions: the Case of Southern Brazilian Hydroelectric Power Plants

    Science.gov (United States)

    Bartiko, Daniel; Chaffe, Pedro; Bonumá, Nadia

    2017-04-01

    Floods may be strongly affected by climate, land-use, land-cover and water infrastructure changes. However, it is common to model this process as stationary. This approach has been questioned, especially when it involves estimate of the frequency and magnitude of extreme events for designing and maintaining hydraulic structures, as those responsible for flood control and dams safety. Brazil is the third largest producer of hydroelectricity in the world and many of the country's dams are located in the Southern Region. So, it seems appropriate to investigate the presence of non-stationarity in the affluence in these plants. In our study, we used historical flood data from the Brazilian National Grid Operator (ONS) to explore trends in annual maxima in river flow of the 38 main rivers flowing to Southern Brazilian reservoirs (records range from 43 to 84 years). In the analysis, we assumed a two-parameter log-normal distribution a linear regression model was applied in order to allow for the mean to vary with time. We computed recurrence reduction factors to characterize changes in the return period of an initially estimated 100 year-flood by a log-normal stationary model. To evaluate whether or not a particular site exhibits positive trend, we only considered data series with linear regression slope coefficients that exhibit significance levels (p<0,05). The significance level was calculated using the one-sided Student's test. The trend model residuals were analyzed using the Anderson-Darling normality test, the Durbin-Watson test for the independence and the Breusch-Pagan test for heteroscedasticity. Our results showed that 22 of the 38 data series analyzed have a significant positive trend. The trends were mainly in three large basins: Iguazu, Uruguay and Paranapanema, which suffered changes in land use and flow regularization in the last years. The calculated return period for the series that presented positive trend varied from 50 to 77 years for a 100 year

  17. The First Israeli Hydro-Electric Pumped Storage Power Plant Gilboa PSPP

    Science.gov (United States)

    Maruzewski, P., Dr.; Sautereau, T.; Sapir, Y.; Barak, H.; Hénard, F.; Blaix, J.-C.

    2016-11-01

    The Israeli Public Utilities Authority, PUA, decided to increase the instantaneous power available on the grid by adding Pumped Storage Power Plants, PSPP, to the existing generation capacity. PSP Investments Ltd. is a private investor that decided to develop the Gilboa PSPP. Its capacity is 300MWe. The project performance has to comply with PUA regulation for PSPP, and with all relevant Israeli laws and IECo standards. This paper itemizes an overview of the Gilboa PSPP through short summaries of units’ components from design step to manufacturing processes.

  18. Hydroelectric power in Romania. Past - present - future

    International Nuclear Information System (INIS)

    Bogan, V.

    1996-01-01

    This paper presents an analysis of the past and present situation in hydroelectric power (achievements, rates of commissioning and so on) and the future strategies for the hydroelectric power resource development in the conditions of a free market economy. At present the contribution of hydroelectric power in the Romania's total power balance is about 16,500 GW h/year which represents nearly 28 %. The theoretical hydroelectric power potential of Romania is 75,000 GW h/year while the technical potential, which could actually be developed, is only 40,000 GW h/year. Finally, there are presented the main directions in the hydroelectric power development up to the year 2020. (author) 3 tabs

  19. Active tectonics and Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (NW Himalaya, India)

    Science.gov (United States)

    Draganits, Erich; Grasemann, Bernhard; Gier, Susanne; Hofmann, Christa-Charlotte; Janda, Christoph; Bookhagen, Bodo; Preh, Alexander

    2015-04-01

    The Baspa River is one of the most important tributaries to the Sutlej River in the NW Himalaya (India). Its catchment is 1116 km2 in size, ranges from c. 6400 m asl to 1770 m asl and contains India's largest private hydroelectric facility, the 300 MW Baspa II. Geologically, the hydroelectric installation is located in the Higher Himalayan Crystalline, just above the active Karcham Normal Fault, which is reactivating the Early Miocene Main Central Thrust, one of the principal Himalayan faults. The area is seismically active and mass-movements are common. Around 8200 yrs BP the Baspa was dammed by a rock-avalanche dam, leading to the formation of the originally c. 260 m deep palaeo-lake Sangla palaeo-lake. Detailed sedimentological investigations and radiocarbon dating indicate that the palaeo-lake was completely filled with sediments until c. 5100 yrs BP. This makes the Sangla palaeo-lake to a very rare example of a mass-movement dam with very long duration and its lacustrine sediments represent a valuable archive for geological processes and environmental proxies within the Baspa catchment during the c. 3100 years of its existence - which are the aim of our study. At least 5 levels of soft-sediment deformation have been recorded in the exposed part of the lacustrine sediments of Sangla palaeo-lake, including brecciated laminae, overturned laminae, folds, faults and deformation bands, separated by undeformed deposits. They are interpreted as seismites, indicating at least 5 earthquakes within 2500 years strong enough to cause liquefaction. The 300 MW Baspa II hydro-electric power plant has been built exactly on top of this palaeo-lake. This special location represents a very rare possibility to evaluate the short-term, river load and hydrological parameters measured during the planning and operational stages of Baspa II with the long-term parameters gained from the palaeo-lake sediments from the catchment. This data show that the Mid-Holocene erosion rates of the

  20. The impact of a hydroelectric power plant on the sediment load in downstream water bodies, Svartisen, northern Norway.

    Science.gov (United States)

    Bogen, J; Bønsnes, T E

    2001-02-05

    When the Svartisen hydroelectric power plant was put into operation, extensive sediment pollution was observed in the downstream fjord area. This paper discusses the impact of the power plant and the contribution from various sources of sediment. Computation of the sediment load was based on samples collected one to four times per day. Grain size distribution analyses of suspended sediments were carried out and used as input in a routing model to study the movement of sediments through the system. Suspended sediment delivered to the fjord before the power station was constructed was measured as 8360 metric tons as an annual mean for a 12-year period. During the years 1995-1996 when the power plant was operating, the total suspended load through the power station was measured as 32609 and 30254 metric tons, respectively. Grain size distribution analyses indicate a major change in the composition of the sediments from 9% clay before the power plant was operative to 50-60% clay afterwards. This change, together with the increase in sediment load, is believed to be one of the main causes of the drastic reduction in secchi depths in the fjord. The effect of the suspended sediment load on the fjord water turbidity was evaluated by co-plotting secchi depth and power station water discharge. Measurements during 1995 and 1996 showed that at the innermost of these locations the water failed to attain the minimum requirement of 2 m secchi depth. In later years secchi depths were above the specified level. In 1997 and 1998 the conditions improved. At the more distal locality, the conditions were acceptable with only a few exceptions. A routing model was applied to data acquired at a location 2 km from the power station in order to calculate the contributions from various sediment sources. This model indicated that the contribution from reservoir bed erosion dominated in 1994 but decreased significantly in 1995. Future operation of the power station will mostly take place with

  1. Cost basis for hydroelectric power plants. Price level of 01.01.1995; Kostnadsgrunnlag for vannkraftanlegg. Prisnivaa pr 01.01.1995

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, H.; Slapgaard, J.

    1995-08-01

    This publication provides a basis for calculation of expected average construction costs and equipment costs for large hydroelectric power plants in Norway. The publication is not intended to be a tool for projecting with regard to optimization or choice of construction types, but should be useful at an early stage of planning. There is a supplementary publication (Publication no. 20/1995) for small plants. 80 figs., 12 tabs.

  2. Recent Trends in Hydroelectric Power Technology

    OpenAIRE

    Belqasem Aljafari

    2016-01-01

    The needed for renewable energy sources is growing day by day because of the severe energy crisis in the world today. Several renewable energy sources like hydroelectric, wind, solar, and biomass can be used for generation of electricity and for meeting our daily energy demands. Hydroelectric energy is essential for a sustainable energy future, and it is a renewable energy source depending on the natural water. As a matter of fact, hydroelectric is a primary source of sustainable power supply...

  3. Hydroelectric power and America's energy future

    International Nuclear Information System (INIS)

    Boxall, J.A. Jr.

    1990-01-01

    This article discusses the debate over the merit of hydroelectric power and the part it will play in providing energy in America in the future. The environmental impact, reliability, efficiency, and regulation of hydroelectric projects are discussed with examples and references to other publications. FERC application of existing regulations in the licensing and relicensing process is also discussed

  4. White gold: hydroelectric power in Canada

    International Nuclear Information System (INIS)

    Froschauer, K.

    1999-01-01

    The first chapter provides insights into hydroelectric development and related politics within the Canadian national, transborder regional, and North American sphere. An analytical examination of the creation and expansion of provincial hydro systems follows. The influence these projects had on industrial transformation is examined as well as their role in power exports. In each provincial case, a brief review is provided of the historical pattern of initially releasing public water power for private development and then reclaiming these privatized hydro-power resources, often with completed power facilities, for public ownership. At the dawn of the twenty first century, it is argued that in keeping with neo-liberal economic policies of governments in the 1990s, hydroelectric resources are in danger of being re-privatized. The main thesis is that instead of providing the infrastructure for a national power grid and serving as a force for indigenous secondary industry, provincial expansions of Canada's hydro resources have merely fostered continued dependence on branch-plant industrial development and have created vast surpluses of electricity for continental, rather than national, use. refs., 7 figs., 18 tabs

  5. An evaluation pattern for antimacrofouling procedures: Limnoperna fortunei larvae study in a hydroelectric power plant in South America.

    Science.gov (United States)

    Darrigran, Gustavo; Damborenea, Cristina; Greco, Nancy

    2007-11-01

    The effects of global change and globalization of trade on the biosphere spur an increase in bioinvasions and their subsequent impact on ecosystems. Continental invading bivalves are important because of their impact on artificially-constructed structures. Limnoperna fortunei was first found in the Neotropical region in 1991. Since then it has dispersed upstream in the Plata and Guaíba basins at a rate of 240 km y(-1). This species causes macrofouling in a manner similar to that caused by Dreissena polymorpha. This paper describes the biology of L. fortunei larvae from a hydroelectric power plant in South America. We suggest the importance of knowing the biology of the invading species and the need to consider the settlement patterns and densities of larvae in each of the sectors of the facility in order to achieve a sustainable prevention/control of macrofouling. This study acquires a global significance under the assumption that L. fortunei will eventually invade North America and Europe.

  6. Evaluation of melioration area damage on the river Danube caused by the hydroelectric power plant 'Djerdap 1' backwater.

    Science.gov (United States)

    Pajic, P; Andjelic, L; Urosevic, U; Polomcic, D

    2014-01-01

    Construction of the hydroelectric power plant (HPP) 'Djerdap 1' formed a backwater effect on the Danube and its tributaries, which had an inevitable influence on groundwater level, causing it to rise and thus creating additional threats to all melioration areas on more than 300 km of the Danube riversides, as well as on the riversides of its tributaries: the Sava (100 km) and the Tisa (60 km). In this paper, the HPP 'Djerdap 1' backwater effect on some characteristic melioration areas (34 in all) has been analyzed. In most of these areas intensive agricultural activity has always been present. An assessment of agricultural production damage was carried out by complex hydrodynamic calculations (60 calculation profiles) for different backwater regimes, with the aim to precisely quantify the HPP 'Djerdap 1' backwater effect on groundwater piezometric levels. Combining them with complex agroeconomic analyses, the aim is to quantify agricultural production damage and to consider the perspective of melioration area users. This method, which combines two different, but compatible, aspects of the melioration area threat assessment (hydrodynamic and agroeconomic), may present a quality base for further agricultural production threat assessment on all melioration areas on the Danube riversides, with the final aim to consider the economic effects and the importance of its further protection.

  7. Development and testing of turbines for small-scale low-head hydroelectric power plants; Developpement des turbines a basses chutes. Laboratoire de mini-hydraulique de Montcherand

    Energy Technology Data Exchange (ETDEWEB)

    Denis, V.

    2002-07-01

    This report presents the design, development, construction and test of a turbine suited for small (up to 1 MW) and low-head (water head from 3 to 30 meters) hydroelectric power plants. The ultimate goal is to propose low-cost, simple and low-maintenance small adaptable hydroelectric units. Turbines are of the Kaplan type, axial, and have variable-pitch blades. Numerical simulations were performed to optimize the water flow at the entrance and exit of the turbine by means of appropriate fins. Various technical innovative aspects were approached. A pilot plant was built to serve as a test installation for the successively modified turbines. Measured mechanical power efficiencies are close to 89%. The installation is suitable for detecting possible cavitation and measuring the blade command torque during operation. The report is supplemented with a schematics of the generic installation and several graphics illustrating the simulation results.

  8. Access to realization of small hydroelectric power station in Republic of Macedonia

    International Nuclear Information System (INIS)

    Jakimova Filipovska, Nevenka

    2001-01-01

    In the paper an overview of the small-scale hydroelectric power plants is presented. The categorization groups of small to micro hydroelectric power plants by different countries are given. Also, the evaluation models of the projects for realization the small hydroelectric power plants are analysed. The aim of the paper is to stress the advantages of the small hydro projects and their implementation in Macedonia

  9. Hydroelectric power is green, although controversial

    International Nuclear Information System (INIS)

    Schulp, A.

    2003-01-01

    Hydroelectric power is worldwide the most important source of renewable energy. Still, it has some controversial aspects, which are briefly discussed in this article, focusing on Belgium and the Netherlands [nl

  10. Experience with the CAD technique in the civil project of thermoelectric and hydroelectric power plants; Experiencia com a tecnica de CAD no projeto civil de usinas hidro e termoeletricas

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, B.E.; Reis, F.J.C.; Varella, L.N.; Coelho, P.C. [PROMON Engenharia SA, Rio de Janeiro, RJ (Brazil)

    1987-12-31

    This work presents some results obtained with the CAD technique application in the project of hydroelectric and thermoelectric power plants. The applications here presented are concerned to the design and general project of the power plants. Some examples such as Angra 1, 2 and 3 nuclear power plants are presented 6 figs.

  11. Possibilities for construction of small hydroelectric power plants in the Republic of Bulgaria

    International Nuclear Information System (INIS)

    Iliev, S.; Angelov, M.; Stojkov, S.; Lefterov, B.

    2001-01-01

    The hydroenergy potential of Bulgaria and its utilization until 2000 is discussed. An assessment is made of the possibilities of the use of additional micro-hydroenergy potential (the preliminary evaluation gives about 1.3 bill. kWh/y with total power 250 MW). In the National Strategy for the development, use and preservation of water in Bulgaria till 2020 it is envisioned 60 micro HPP with power of 36 MW power to be constructed. The Program for hydro energy to 2010 envisioned including of private investments if the construction, buying up the electric energy by the National Electric Company and two-stage construction of the cascade 'Sreden Iskyr' with 10 small NPPs. The necessity of the development of a Manual of express investigation and design of small NPP is substantiated

  12. Improvements for conventional clean energies: hydroelectric power

    International Nuclear Information System (INIS)

    Henry, P.

    1991-01-01

    Hydro-electric energy offers considerable possibilities and advantages which should be exploited before considering the construction of power which use fossil fuels. In fact: - hydro-electric is the only renewable energy available in very large quantities at competitive prices, - there are still many possibilities for producing it since at present only 14% is exploited, - hydraulic machines have been considerably improved over recent years, - the improvements make it possible to use watercourses in successive stages thus considerably reducing damage to the environment, - hydro-electric installations have a regulating effect, - vast areas of uncultivated land can be irrigated using the water reserves created by the artificial lakes. All these reasons favour intensive exploitation of hydro-electric energy reserves, in spite of the initial investment costs, which are sometimes higher than those for constructing fuel/driven power stations. (author) 9 figs., 1 tab., 3 refs

  13. Development Trend of Chinese Hydroelectric Generation Technology of Hydro Power Plant (HPP)

    OpenAIRE

    Jamil, Rehan; Jamil, Irfan; Jinquan, Zhao; Li, Ming; Qirong, Jiang; Jamil, Rizwan

    2014-01-01

    International audience; Water power is a renewable energy which is economically cheap, clean and reliable. Theoretical hydropower resources of China amounted to 680 million kW, the greatest in the world. For the water maintains circulating according to a certain hydrologic cycle continuously and uninterruptedly, the water resources are considered to be a renewable energy. Therefore Hydropower is low cost due to firstly, the energy carried by the water flow is the only energy required for the ...

  14. Light at the end of the tunnel: the Ita hydroelectric power plant open perspectives for the effective implantation of the new model for electric power generation, leaded by the private electric power industry; Luz no fim do tunel: hidroeletrica de Ita abre perspectivas para a implantacao efetiva do novo modelo de geracao de energia, liderado pela iniciativa privada

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2000-11-01

    This article analyse the importance of the Ita hydroelectric power plant for the electric power supply avoiding the reduction of the Brazilian economic growth representing a challenge for the government and the private initiative.

  15. Erosion Control and Recultivation Measures at a Headrace Channel of a Hydroelectric Power Plant using Different Combined Soil Bioengineering Techniques

    Science.gov (United States)

    Obriejetan, M.; Florineth, F.; Rauch, H. P.

    2012-04-01

    vegetation properties are studied by setting up comparative test plots at a field study site located at a headrace channel of a hydroelectric power plant. Different vegetational parameters such as basal coverage, species richness, species composition, abundance/dominance values by using a refined Braun-Blanquet cover estimation scale were collected as well as local environmental properties. Results during the first vegetation period show distinct effects of geotextiles especially on overall vegetation coverage and grasses-herbs-ratio. Geotextile supported plots show 20% higher overall coverage but lower amount of herbs after three months of vegetation growth compared to control plots without installation of auxiliary materials. Furthermore coir blankets reveal higher penetration resistance for seed leaves of herbal plants compared to coir nettings. Hence technical erosion protection products, biological components and it's combination have to be closely coordinated in order to achieve specified revegetation objectives and meet long-term functionality.

  16. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  17. The portfolio theory applied to small hydroelectric power plants; Teoria do portfolio aplicada a pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Bastos, Paulo Roberto Ferreira de Moura

    2002-07-01

    The 'Portfolio Theory' has been largely employed on stock markets, aiming to improve the relation between risk and return. This theory identifies many possible investment combinations once it's associated with the idea that increasing investment diversification can lower risk. The objective is, thus identify the portfolio that offers the most efficient diversification of capital. The reforms on the energy sector in Brazil have made investments on both generation and commercialization of electric energy easier for medium sized investors. There have been economic incentives to the exploration of wind and bio-mass energy, and to the construction of small hydro-electric power plants (in Portuguese, PCH), as well as many legal and regulatory mechanisms pursuing the maintenance of elevate rates of participation of renewable source in the production of electrical energy in Brazil. Between these options, the PCH are a specially good opportunity taking account of its minimum environment impact, low operational costs and total technologic control. The decision concerning investment options has been based on standard economic analysis like 'Net Present Value', 'Payback Time' or 'Cost/Benefit Relations'. Other techniques such as scenario and sensitivity have been incorporated and, more recently, there has been a search for other methods consider the uncertainty of happenings within the horizon of study. This dissertation will analyse six possibilities of PCH with standard techniques. Of them, the four possibilities considered viable will constitute our examples for the application of Portfolio Theory techniques. Once the active portfolio is determined, the best option is identified using the 'mean-variance efficient' developed by Markowitz, concluding that the theory can give better support to the decision-making in future enterprises on the electric sector. After considering the optimal return/risk combinations, there was

  18. Feasibility study for the partial conversion of a hydropower plant into a pumped-storage power plant: a case study of hydroelectric power plant La Barca (Asturias, Spain

    Directory of Open Access Journals (Sweden)

    E. Antuña Yudego

    2017-01-01

    Full Text Available Renewable energy sources have reported an unprecedented increase of global installed renewable power capacity. Against the advantages provided by this renewable power generation technology it should be taken into account an important issue: these intermittent energy sources supply a fluctuating output which is difficult to manage. Pumped-storage hydro power plants reappear in these circumstances as an efficient form of energy storage which allows to use reserves when necessary, enabling power generation output to cover continuously this energy demand. The present paper shows a simplified feasibility study of the partial conversion of hydropower plant La Barca, in Asturias, into a reversible storage through the development of an algorithm to simulate its operation according to electricity market prices. For this purpose, the operation in the deviation management market is considered and the technical modifications required for the conversion are shown. The estimation of costs and incomes present a feasible scenario.

  19. Spatial and temporal abundance of three sylvatic yellow fever vectors in the influence area of the Manso hydroelectric power plant, Mato Grosso, Brazil.

    Science.gov (United States)

    Ribeiro, A L M; Miyazaki, R D; Silva, M; Zeilhofer, P

    2012-01-01

    Human biting catches of sylvatic yellow fever (SYF) vectors were conducted at eight stations in the influence area of the Manso hydroelectric power plant (Central Brazil) in sampling campaigns every 2 mo from July 2000 to November 2001. In total, 206 individuals were captured and classified as one of three species important for the transmission of SYF in Mato Grosso state: Haemagogus (Haemagogus) janthinomys (Dyar, 1921); Haemagogus (Conopostegus) leucocelaenus (Dyar & Shannon, 1924); and Sabethes (Sabethoides) chloropterus (Humboldt, 1819). The highest vector abundance was observed during the rainy season (November through March) and SYF vectors were present in all sampling points throughout the year, mainly in riparian and shadowed transitional forests at shadowed ramps.

  20. Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.; Skvortsova, A. E., E-mail: SkvortsovaAE@vniig.ru [B. E. Vedeneev All-Russia Research Institute of Hydraulic Engineering (VNIIG) (Russian Federation)

    2017-01-15

    Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.

  1. Dry Falls Dam potential hydroelectric power. Feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    HOsey, Harry P.

    1979-01-01

    The feasibility of constructing a low-head hydroelectric power plant at the existing Dry Falls Dam in Washington was studied considering technical, economic, environmental, regulatory, and safety factors. As a result of this study it is recommended that a 12 MW power plant be installed. Annual energy production would be 56 million kWh at an initial cost of 21.2 mills/kWh. (LCL)

  2. Present status and perspectives for hydroelectric power in world

    International Nuclear Information System (INIS)

    Malquori, E.

    1991-01-01

    In the note a review of the present status and perspectives of hydroelectric power in the world is introduced. The present status regards, in chronological order, the last decade, as to say the works carried out in the 80ies whereas the perspectives regard the next twenty years as to say until 2010. The mentioned electric power potentiality refers to pure generation plants of great, middle and small size and to what could be achieved by already existing plants after changes and/or replacements and improvement of the machinery. Beside the figures regarding powers, great generation and pumping plants whose contribution has been and will be remarkable have been properly mentioned. The Italian contribution - civil works design, construction, and machinery supply - in the last hydroelectric development is briefly mentioned with particular reference to the developing countries

  3. Aquatic biology and hydroelectric power development in New Zealand

    National Research Council Canada - National Science Library

    Henriques, P. R

    1987-01-01

    .... The first section summarizes the country's hydroelectric resources and their utilization. The legal and planning framework associated with hydroelectric power development and the environment is covered in the second section...

  4. Impact of the construction of a hydroelectric power plant on the land cover and use: study of the basin Lajeado Bonito - RS

    International Nuclear Information System (INIS)

    Tramontina, Juliana; Breunig, Fabio Marcelo

    2015-01-01

    This work aims to analyze the impact of the construction of a hydroelectric power plant on land cover and use in Lajeado Bonito-RS watershed. The study evaluated the temporal evolution of land cover and use in the watershed for the period before and after to installation of hydroelectric plant Foz do Chapeco (2009 to 2010). For temporal analysis, two images were interpreted, one orbital image of High Resolution Camera (HRC) onboard of the CBERS-2B, acquired in December 29, 2009. And a high-resolution image obtained from Google Earth application, acquired at December 26, 2010. The land cover and use maps were generated by vector editing SPRING software. We found that the predominant land use related to agriculture and livestock, including bare soil. In 2009 this class accounted for 70.23% of the total area, while it come to represent 61.8% in 2010. At the same time, there was increase of areas with native forest cover, from 27.49% covered by forest in 2009, to 31% in 2010. The results showed that in both 2009 and 2010 years, approximately 49% of permanent preservation area were used inappropriately. (author)

  5. [The assessment of the general functional status and of the psychosomatic complaints of workers at hydroelectric power plants].

    Science.gov (United States)

    Danev, S; Dapov, E; Pavlov, E; Nikolova, R

    1992-01-01

    Evaluation of the general functional status and psychosomatic complaints of 61 workers from the hydroelectric power stations is made. The following methods are used: 1. Assessment of the general functional state, by means of computer analysis of the cardiac variability, analysing the changes in the values of the following indices: average value of the cardiac intervals (X), their standard deviation (SD), coefficient of variation (CV), amplitude of the mode (AMO), index of stress (IS), index of the vegetative balance (IVB), homeostatic index (HI). The last 3 indices serve for determination of the complex evaluation of chronic fatigue and work adaptation (ChFWA). 2. Evaluation of the psychosomatic complaints, by the use of a questionnaire for the subjective psychosomatic complaints. 3. Studying the systolic and diastolic blood pressure. The average values received in workers from HPS were compared with the average values of the population of the country and with the average values of a similar working activity of a group of operators from the thermal power station HPS. In conclusion it could be noted that concerning ChFWA the received values in workers from HPS are not more unfavourable generalized values from that measured in workers, occupied with similar type of work in other industrial branches of the country. However, they are with more unfavourable data in comparison with the workers from HPS. The subjective evaluation of the operators concerning their psychic and body health status is moderately worse, both in comparison with the values of the index for the country, and in comparison with those of the operators from HPS.

  6. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  7. Rural electrification in Santarem: contribution of micro hydroelectric power plants; Eletrificacao rural em Santarem: contribuicao das micro centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Els, Rudi Henri Van; Diniz, Janaina Deane De Abreu Sa; Souza, Josiane do Socorro Aguiar de; Brasil Junior, Antonio Cesar Pinho; Sousa, Antonio Nazareno Almada de [Universidade de Barsilia (UnB), DF (Brazil). Lab. de Energia e Ambiente; Kroetz, Jaemir Grasiel [Indalma Industria e Comercio, Santarem, PA (Brazil)

    2010-07-01

    The municipality of Santarem in the lower Amazon river is the main center in the western region of the state of Para with a population of 274.285 inhabitants, with 31.633 of them living in the rural zone, where only 1.060 rural costumers have access to regular electricity service from the utility provider. This incipient coverage of electricity service in the rural zone urged the local population to look for alternatives. This was found in the use of the hydraulic potential of creeks and rivers with rapids and waterfalls to implement pico and micro hydroelectric plants. So since 2001, 44 pico and 12 micro hydropower plants were installed in the municipalities of Santarem, Belterra and Uruara in the state of Para by local entrepreneurs and communities to attend their basic electricity needs. These systems attend approximately 580 families with a total installed capacity of more than 700 kVA. The consolidation of this technological alternative induced the Regional Superintendent of the Institute for Colonization and Land Reform (INCRA) and the Municipality of Santarem to elaborate a project to attend the land reform settlements in the region. This led to the installation of 6 micro hydropower (MHP) with a total installed capacity of 820kVA and a 252 km distribution network to attend 1.630 families in the settlements of Moju and Corta Corda. The purpose of this paper is to present the MHP's installed in the region and to show the contribution of these units in the rural electrification of rural settlements in Santarem. The paper discusses also the management model of these units. The survey's methodology consisted in the systematization of project data from the plant builder, INCRA and the municipality. The information was obtained from the official bibliography from the local actors and complemented by field surveys with interviews and observation. Despite the fact that the MHP's are in operation, they are not yet registered in the data base of the

  8. Methodology to identify the location of shoals of fish downstream from hydroelectric power plant; Metodologia para identificar a locacao de cardumes de peixes a jusante de UHE

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, C.B.; Viana, E.M.F.; Faria, M.T.C. de [Universidade Federal de Minas Gerais, Belo Horizonte, MG (Brazil). Centro de Pesquisas Hidraulicas e Recursos Hidricos], Emails: martinez@cce.ufmg.br, ednamariafaria@ufmg.br, mtcdf@uol.com.br

    2009-07-01

    The location identification of fish shoals at the downstream of an hydroelectric power plants is a task of importance especially when one takes into account the need to identify possible locations for the deployment of fish transportation mechanism. This paper presents a methodology based on the use of reduced models, which will be operated during the biological testing, under flow and conditions similar to the field where will be included shoals of fish. These groups will be observed during a period of time under varying conditions of discharge of hydraulic turbines. At the end of this observation it can be identified preferential location areas of fish shoals that will be evaluated later in order to install transposition systems in the place.

  9. Categorization of the trophic status of a hydroelectric power plant reservoir in the Brazilian Amazon by statistical analyses and fuzzy approaches.

    Science.gov (United States)

    da Costa Lobato, Tarcísio; Hauser-Davis, Rachel Ann; de Oliveira, Terezinha Ferreira; Maciel, Marinalva Cardoso; Tavares, Maria Regina Madruga; da Silveira, Antônio Morais; Saraiva, Augusto Cesar Fonseca

    2015-02-15

    The Amazon area has been increasingly suffering from anthropogenic impacts, especially due to the construction of hydroelectric power plant reservoirs. The analysis and categorization of the trophic status of these reservoirs are of interest to indicate man-made changes in the environment. In this context, the present study aimed to categorize the trophic status of a hydroelectric power plant reservoir located in the Brazilian Amazon by constructing a novel Water Quality Index (WQI) and Trophic State Index (TSI) for the reservoir using major ion concentrations and physico-chemical water parameters determined in the area and taking into account the sampling locations and the local hydrological regimes. After applying statistical analyses (factor analysis and cluster analysis) and establishing a rule base of a fuzzy system to these indicators, the results obtained by the proposed method were then compared to the generally applied Carlson and a modified Lamparelli trophic state index (TSI), specific for trophic regions. The categorization of the trophic status by the proposed fuzzy method was shown to be more reliable, since it takes into account the specificities of the study area, while the Carlson and Lamparelli TSI do not, and, thus, tend to over or underestimate the trophic status of these ecosystems. The statistical techniques proposed and applied in the present study, are, therefore, relevant in cases of environmental management and policy decision-making processes, aiding in the identification of the ecological status of water bodies. With this, it is possible to identify which factors should be further investigated and/or adjusted in order to attempt the recovery of degraded water bodies. Copyright © 2014 Elsevier B.V. All rights reserved.

  10. Influence of environmental parameters on the concentration of subsurface dissolved methane in two hydroelectric power plants in Brazil

    Science.gov (United States)

    Silva, M. G.; Marani, L.; Alvala, P. C.

    2013-12-01

    Methane (CH4) is a trace gas in the atmosphere of great importance for atmospheric chemistry as one of the main greenhouse gases. There are different sources with the largest individual production associated with the degradation of organic matter submerged in flooded areas. The amount of dissolved methane that reaches the surface depends on the production in the sediments and consumption in the water column. Both processes are associated with microbial activity and consequently dependent on the physico-chemical environmental conditions. The construction of hydroelectric dams cause flooding of areas near the river that can change the characteristics of the environment and cause changes in subsurface methane concentration. In this work, we studied two hydroelectric plants located in Brazil: Batalha (17°20'39.52"S, 47°29'34.29"W), under construction when the samples were take, and Itaipu (25°24'45.00"S, 54°35'39.00"W) which has been floated over 30 years ago. The water samples to determine dissolved methane were collected approximately 5 cm near the surface. In each collection point was measured depth, water temperature, pH and redox potential. The range of dissolved methane between the two dams was similar: 0.07-10.33 μg/l (Batalha) and 0.15-10.93 μg/l (Itaipu). However, the Batalha's average (4.04 × 3.43 μg/l; median = 3.66 μg/l) was higher than that observed in Itaipu (2.15 × 1.59 μg/l; median = 2.53 μg/l). The influence of environmental parameters on the concentration of dissolved methane was evaluated by multivariate statistical techniques (Principal Component Analysis - PCA). All of the parameters had some correlation with dissolved methane, however, the greatest contribution in Batalha was associated with pH while in Itaipu was the depth. The pH variation of the various points studied in Batalha may be associated with periods of drought and flooding of the river and hence the incorporation of organic matter in the environment. The organisms

  11. Use of cost benefit analysis methodology in the meaning of motorization level from small and medium hydroelectric power plants

    International Nuclear Information System (INIS)

    Mazzon, J.G.; Simoes, N.S.; Ramos, D.S.; Ishida, S.

    1989-01-01

    The technical and economic justifications that bringing the waterfall division reformulation between Lucas Nogueira Garcez Plant and Capivara Plant in Paranapanema River (Brazil) are described, including a comparative economic of Canoas (Alta), Canoas I and Canoas II passages, motorization study and energetic benefits. The reasons of the Bulbo turbines choice and dimensioning definition of the installed power by the new reference economic parameters are also presented. (C.G.C.). 5 refs, 11 tabs

  12. Sub-Saharan hydroelectric power development potential

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1991-01-01

    Though evidencing a power demand which is amongst the lowest in the world, the sub-Saharan regions of Africa are blessed with an enormous hydroelectric power resource potential, which, if suitably developed and tapped, may become a source of economic electric energy for Europe. With the aid of numerous statistical supply and demand data, this paper surveys the marketing potential of this energy source in Africa. The analysis of future development prospects is carried out with reference to the local socio-economic framework

  13. The hydroelectric power plant as a project of private investment; La central hidroelectrica como proyecto de inversion privada

    Energy Technology Data Exchange (ETDEWEB)

    Guerra, Eduardo [Industrias Metalurgicas Pescarmona S.A. (IMPSA), Mendoza (Argentina)]. E-mail: guerra@impsa.com.ar

    2001-07-01

    The paper describes the process to be followed for the performance, construction and operation of a hydroelectric investment from the view point of a private investor. The paper demonstrates that it is possible to finance the project through the 'project finance', where the finance has as guarantee the own assets and the fund fluxes of the investment.

  14. Feasibility of determination of low-head hydroelectric power development at existing sites. Dan River hydroelectric development. Feasibility report

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, S. J.; Sinclair, J. P.

    1979-04-01

    The results of a study to determine the feasibility of redeveloping the hydroelectric power potential of the Dan River in Danville, Virginia, are reported. Redeveloping the power potential would involve refurbishing and/or rehabilitating the existing power plant at the Schoolfield Dam and building a new power facility at the Union Street Dam downstream of the Schoolfield Dam. The technical, economic, environmental, and safety aspects were evaluated and indicate that, for the present, this development is not economically feasible. (LCL)

  15. Use of cybernetic technology in creating projects of hydroelectric power plants; Utilizacao de tecnologias computacionais na elaboracao de projetos de usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Miranda, Fernando [Voith S.A., Maquinas e Equipamentos, Jaragua, SP (Brazil)

    1993-12-31

    The subject of this technical description is an approach of cybernetic technology used in creating projects of hydroelectric plants, showing the state of the art. The right use of hydraulic and mechanic aspects allows swiftness and a better understanding about the system of parts involved in the project. Quality evaluation of these aspects will show the suitability of those facilities 1 ref., 10 figs.

  16. Potential hydroelectric power Mora Canal Drop. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Willer, D.C.

    1978-12-01

    The feasibility of installing a hydroelectric power plant on the Mora Canal Drop site in Idaho was studied. It was recommended that a 1900 kW unit be installed to generate 8,113,000 kWh per year. The project should cost approximately $1.8 million. The generating cost would be between 20.3 and 22.2 mills/kWh. A local utility has offered to buy all power produced at 26 mills/kWh. No adverse environment, safety, or socio-economic effects are foreseen. (LCL)

  17. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  18. Evaluation for turbine implementation for a micro hydroelectric power plant; Avaliacao para implantacao de uma turbina para uma microcentral hidreletrica

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Gilberto Manoel; Halmeman, Maria Cristina Rodrigues; Oliveira, Franciene Gois [Universidade Estadual Paulista (UNESP), Botucatu, SP (Brazil). Programa de Pos-graduacao em Energia na Agricultura; Seraphim, Odivaldo Jose [Universidade Estadual Paulista (UNESP), Botucatu, SP (Brazil). Dep. de Engenharia Rural

    2008-07-01

    In this work it was analyzed the viability technical and economical of turbines to micro hydroelectric headquarters as an alternative to consumers not served by electric energy in isolated areas. It was used a experimental methods to create an estimative and a evaluation of the hydroelectric potential, through hydrological criteria in the area and, thus, be able to note if there is viability for its use. Some kinds of turbines made by the national industry were verified, analyzing the technical and economical characteristics and in function of the hydro energetic-conditions of the area. The results shoed that a micro-headquarters serves the necessities and expectations of the owner at the electric energy supply. It was noted that the expenses are smaller comparing to the other expenses know in the literature, from national factories. Even though the limiting factor is the distance from the production to the consumer, the potency of 18.4 kw was enough to satisfy the local necessities. The installation of de micro headquarters will bring enhances and facilities by the fact that it represents a big social importance for the area. (author)

  19. Contribution of the Mattmark hydroelectric storage power plant to flood protection in the Wallis region, Switzerland; Der Beitrag des Speicherkraftwerkes Mattmark zum Hochwasserschutz im Wallis

    Energy Technology Data Exchange (ETDEWEB)

    Sander, B. [Elektrizitaets-Gesellschaft Laufenburg AG, Laufenburg (Switzerland)

    2002-07-01

    In the more distant past, the valley of the river Rhone and its lateral valleys were repeatedly struck by catastrophic floods. The archives contain many reports about such events. In the 20th century, the first hydropower plants were built and several large hydroelectric storage power plants were realized after World War II. Thus, after 1948, no floods occurred in the Wallis canton for a relatively long period until a series of flood events (1987, 1993, 1994 and 2000) shocked the population and caused a controversial public debate. The severe 1993 event in particular, where the town of Brig and the Saas valley were flooded while the town of Visp was extremely endangered, initiated a change of attitude among the population concerned. (orig.) [German] Im Wallis wurden schon in fruehen Zeiten die Seitentaeler und das Rhonetal wiederholt von schweren Hochwasserkatastrophen heimgesucht. In den Archiven finden sich dazu viele Berichte. Im 20. Jahrhundert setzte der Kraftwerksbau ein, nach dem zweiten Weltkrieg entstanden mehrere grosse Speicherkraftwerke. So blieben im Wallis nach 1948 groessere Hochwasser laengere Zeit aus, bis eine Serie von Hochwassern 1987, 1993, 1994 und 2000 die Bevoelkerungen wachruettelte. Besonders das schwere Ereignis 1993 mit der Ueberschwemmung von Brig und des Saastals sowie der extremen Gefaehrdung von Visp leitete einen Gesinnungswandel bei vielen Betroffenen ein. (orig.)

  20. Application of multi-model control with fuzzy switching to a micro hydro-electrical power plant

    Energy Technology Data Exchange (ETDEWEB)

    Salhi, Issam; Doubabi, Said [Laboratory of Electric Systems and Telecommunications (LEST), Faculty of Sciences and Technologies of Marrakesh, Cadi Ayyad University, BP 549, Av Abdelkarim Elkhattabi, Gueliz, Marrakesh (Morocco); Essounbouli, Najib; Hamzaoui, Abdelaziz [CReSTIC, Reims University, 9, rue de Quebec B.P. 396, F-10026 Troyes cedex (France)

    2010-09-15

    Modelling hydraulic turbine generating systems is not an easy task because they are non-linear and uncertain where the operating points are time varying. One way to overcome this problem is to use Takagi-Sugeno (TS) models, which offer the possibility to apply some tools from linear control theory, whereas those models are composed of linear models connected by a fuzzy activation function. This paper presents an approach to model and control a micro hydro power plant considered as a non-linear system using TS fuzzy systems. A TS fuzzy system with local models is used to obtain a global model of the studied plant. Then, to combine efficiency and simplicity of design, PI controllers are synthesised for each considered operating point to be used as conclusion of an electrical load TS Fuzzy controller. The latter ensures the global stability and desired performance despite the change of operating point. The proposed approach (model and controller) is tested on a laboratory prototype, where the obtained results show their efficiency and their capability to ensure good performance despite the non-linear nature of the plant. (author)

  1. The role of hydroelectric power in energy economy

    International Nuclear Information System (INIS)

    Allet, B.

    1989-01-01

    The state of development and the technical potential of hydroelectric power worldwide, in Europe and in Switzerland are briefly compared with each other. Afterwards, the most important types of hydroelectric power stations and their function in the electricity-distribution network, are put forward. The realistic possibilities of development in Switzerland, up to the year 2025, of each type of hydroelectric power station is judged with regard to the currently valid regulations. The effects of the peoples' initiative - 'towards the salvation of our waters' or for stricter regulations for the protection of water - on the chances of realisation of these possibilities of development are shown. The forseeable decrease in the production of energy by the existing hydroelectric power stations, as a result of the regulation planned for rest water, is judged. Various forecasts for the future quantity of hydroelectric power production in Switzerland are put forward. 6 figs., 7 tabs., 12 refs

  2. Structure dynamics of a fish community over ten years of formation in the reservoir of the hydroelectric power plant in upper Uruguay River.

    Science.gov (United States)

    Schork, G; Zaniboni-Filho, E

    2017-11-01

    The objective of this study was to evaluate the structure of the fish assemblage in the ten years following the closing of the lake of the Itá Hydroelectric Power Plant. Seasonal collections were conducted from 2001 to 2010. During this period, 44,834 fish were captured, totaling 3,818.01 kg, among 8 orders, 24 families and 84 species. In general, profound changes were not observed in the fish assemblage in the ten years after the formation of the Itá lake. Few species changed in dominance over time, while many were rare in the environment. The ichthyofauna in the reservoir was dominated by small and medium size opportunist species that conduct short or no migratory movements. Among the most abundant, six species were responsible for more than 50% of the numeric representation: Steindachnerina brevipinna, Astyanax fasciatus, Apareiodon affinis, Hypostomus isbrueckeri, Iheringichthys labrosus and Loricariichthys anus. The increase in the representation of the later species stood out. The biomass was dominated by Steindachneridion scriptum, Prochilodus lineatus, I. laborsus, Schizodon nasutus, Hoplias malabaricus, Acestrorhynchus pantaneiro, Hoplias lacerdae, H. isbrueckeri and L. anus. Despite the presence of large migrators in the region of the reservoir, their vulnerability was revealed by the low numeric abundance and accidental capture. The k-dominance curve of numerical abundance and biomass indicates a moderately disturbed community, in which the representation of small species was also important to the amounts of biomass.

  3. The cross flow turbine (Michell - Banki) as option for small hydroelectric power plants; A turbina de fluxo cruzado (Michell - Banki) como opcao para centrais hidraulicas de pequeno porte

    Energy Technology Data Exchange (ETDEWEB)

    Mello Junior, Antonio Goncalves de

    2000-07-01

    Several types of hydraulic turbines can be used in small hydroelectric power plant, as Pelton, Francis, Turgo, Kaplan, Propeller, Banki, etc. In Brazil the more used are Francis and Kaplan followed by Pelton. The usage of the other types is almost unknown, mainly the Turgo turbine. The cross flow turbine, also known by the names of Michell-Banki, Banki, and Michell-Ossberger is defined as an action turbine that can be applicable to falls from 1 to 200 m and flows from 0,025 to 13 m{sup 3}/s. With the technical evolution mainly in the last two decades by traditional firms like Ossberger Turbinenfabrik and new firms like CINK, that turbine can reach diameters of rotors of 1,0 m with width of 2,6 m and to develop capacity up to 2,000 k W, with efficiency near 90%. The main evolutions are concentrated in modifications presented in the injector of the turbine by several manufacturers, and the use of new materials in the blades of the runner, shafts, bearings and the use of the draft tube. Case study shows the technical and economical implications using a cross flow turbine in comparison to a Francis turbine and a Kaplan. The conclusions will be reported after technical and economical viability analysis among the three types of turbines. (author)

  4. Application of fuzzy logic in mapping the environmental impacts of hydroelectric power plants; Aplicacao da logica difusa no mapeamento de impactos ambientais em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Melo, M.N.; Lambert-Torres, G.; Silva, L.E. Borges da [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], Emails: germanoltorres@gmail.com, leborges@unifei.edu.br; Rissino, S.; Silva, M.F. da [Universidade Federal de Rondonia (UFRO), Porto Velho, RO (Brazil)], e-mails: srissino@gmail.com, felipe@unir.br

    2009-07-01

    During the stages prior to installation of a large enterprise, there is an obligation to obtain an environmental license for its effectiveness. However, defining the relevance of an environmental impact generated by changes elapsed in a region, is something subjective, since some variables present qualitative definitions. Aiming to interrelate the variables that influence the environmental impacts in hydroelectric plants, was made the mapping of terms natural resources and degradation of the environment, and its defining variables, based on the theory of fuzzy logic. The construction of fuzzy propositions was based on the manipulation of a rule base, with the 'if' antecedent 'then' consequent structure. It was concluded that the use of fuzzy propositions for the study of environmental impact is an effective method to map the environmental impact caused by construction of a hydroelectric plant, because it defines the degree of influence of impact on the environment.

  5. Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (India, NW Himalaya)

    Science.gov (United States)

    Draganits, Erich; Gier, Susanne; Hofmann, Christa-Ch.; Janda, Christoph; Bookhagen, Bodo; Grasemann, Bernhard

    2014-08-01

    300 MW Baspa II is India's largest private hydroelectric facility, located at the Baspa River which is an important left-hand tributary to the Sutlej River in the NW Himalaya (India). In this valley the Sangla palaeo-lake has been dammed around 8200 yr BP behind a rock-avalanche dam and Baspa II is located exactly on top of this palaeo-lake. This special location represents a very rare possibility to evaluate the short-term, river load and hydrological parameters measured during the planning and operational stages of Baspa II with the long-term parameters gained from the palaeo-lake sediments from the catchment. Sedimentological and geomorphological investigations of the lacustrine sediments have been used to reconstruct environmental changes during >2500 years of its existence. The Mid-Holocene erosion rates of the Baspa catchment estimated from the volume and duration of deposition of the exposed lake sediments are at 0.7-1.0 mm yr-1, almost identical with the modern erosion rates calculated from river gauge data from Baspa II. Several charcoal layers and charcoal pieces from the uppermost palaeo-lake levels around 5000 cal yr BP might be related to woodland clearance and they possibly represent one of the oldest evidences for human presence in the Baspa Valley during Neolithic time.

  6. Measurement of the efficiency of a small hydroelectric power plant using the pressure/time method; Wirkungsgradmessungen nach der Druck-Zeit-Methode in einer Kleinwasserkraftanlage

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, K.

    1994-12-31

    Flow measurements at the small hydroelectric power plant at Mittersill/Austria had the aim to test the pressure/time method with minimum effort. An accuracy of {+-} 3 per cent for the flow measurement was aimed at. Of the four envisaged evaluation methods, only the two measurements of absolute pressure yielded useful results. The evaluation according to the differential time/pressure method with recording of differential pressure revealed a systematic error, which is probably due to the high proportion of friction. In view of the fact that the plant in question presents difficult boundary conditions, the executed measurements may be considered as successful. Consequently, flow measurement according to the pressure/time method should be a suitable primary method for determining the efficiency of small plants with pipes in economic terms, especially in such cases where the prerequisites indicated in the IEC Code are fulfilled. However, measurements should expediently by taken into account already during planning. (orig./AKF) [Deutsch] Die Durchflussmessungen an der Kleinwasserkraftanlage in Mittersill/Oesterreich hatten zum Ziel, die Druck-Zeit-Methode mit einem minimalen Aufwand zu testen. Es sollte dabei eine Genauigkeit fuer die Durchflussmessung von {+-}3% angestrebt werden. Von den 4 vorgesehenen Auswertemethoden erbrachten nur die beiden Absolutdruckmessungen brauchbare Werte. Bei der Auswertung nach der differentiellen Zeit-Druck-Methode mittels Differenzdruckaufnehmer zeigte sich ein systematischer Fehler, welcher vermutlich auf den hohen Reibungsanteil zurueckzufuehren ist. In Anbetracht der anlagenbedingten schwierigen Randbedingungen koennen die durchgefuehrten Messungen als gelungen angesehen werden. Die Durchflussmessung nach der Druck-Zeit-Methode duerfte damit eine geeignete Primaermethode zur wirtschaftlichen Bestimmung des Wirkungsgrades von Kleinanlagen mit Rohrleitungen sein, zumal dann, wenn die im IEC-Code aufgefuehrten Voraussetzungen erfuellt

  7. Ground failure in direct current systems of the Itaipu Hydroelectric Power Plant, Parana, Brazil. Impact in the operation; Falla a tierra en sistemas de corriente continua en la Central Hidroelectrica Itaipu, PR, Brasil. Impacto en la operacion

    Energy Technology Data Exchange (ETDEWEB)

    Soto Santacruz, Heriberto [Itaipu Binacional, Foz do Iguacu, PR (Brazil)]. E-mail: soto@itaipu.gov.py

    1998-07-01

    The objective of this work is to share with other companies the operation experience obtained by researching the direct current systems ground failure, in the Itaipu Hydroelectric Power Plant. During the research process electrical and/or electronic components can be damaged, and also human failures can occurred during the circuit connection and disconnection manoeuvres, necessary for the identification of the components causing the failures.

  8. Ecologically justified regulatory provisions for riverine hydroelectric power plants and minimum instream flow requirements in diverted streams; Oekologisch begruendete, dynamische Mindestwasserregelungen bei Ausleitungskraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Jorde, K.

    1997-12-31

    The study was intended to develop a model versatile enough to permit quantification of various water demand scenarios in connection with operation of riverine hydroelectric power plants. Specific emphasis was to be placed on defining the minimum instream flow to be maintained in river segments because of the elementary significance to flowing water biocinoses. Based on fictitious minimum water requirements, various scenarious were simulated for flow regimes depending on power plant operation, so as to establish a system for comparative analysis and evaluation of resulting economic effects on power plant efficiency on the one hand, and the ecologic effects on the aquatic habitat. The information derived was to serve as a basis for decision-making for regulatory purposes. For this study, the temporal and spatial variability of the flow regime at the river bed in a river segment was examined for the first time. Based on this information, complemented by information obtained from habitat simulations, a method was derived for determination of ecologic requirements and their incorporation into regulatory water management provisions. The field measurements were carried out with the FST hemisphere as a proven and most efficient and reliable method of assessing flow regimes at river beds. Evaluation of the measured instream flow data characterising three morphologically different segments of diverted rivers was done with the CASIMIR computer code. The ASS models derived were used for comparative assessment of existing regulatory provisions and recommended amendments determining required minimum instream flow in diverted rivers. The requirements were defined taking as a basis data obtained for three different years. (orig./CB) [Deutsch] Ziel der Arbeit war die Entwicklung eines Modellverfahrens, das flexibel die Quantifizierung unterschiedlicher Nutzansprueche an Laufwasserkraftanlagen ermoeglicht. Insbesondere der Erhalt einer gewissen Dynamik, die fuer

  9. Brighter for small power plants

    International Nuclear Information System (INIS)

    Haaland, Leif

    2003-01-01

    The article presents a small tunnel drilling machine aimed at using for the construction of small hydroelectric power plants and mentions briefly some advantages economically and environmentally of both the machine and the power production solution

  10. An analysis on the costs of Belo Monte hydroelectric power plant; Uma analise sobre os custos da hidreletrica Belo Monte

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Marcos Vinicius Miranda da [Universidade de Sao Paulo (PIPGE/USP), SP (Brazil). Programa Interunidades de Pos-Graduacao em Energia], e-mail: energiapara@yahoo.com.br

    2008-07-01

    The Belo Monte hydropower plant's low generation cost is among the arguments used by Centrais Eletricas do Norte do Brazil (ELETRONORTE), a Brazilian state electric utility, to make possible its construction. This paper shows that the generation cost presented by ELETROBRAS is very low in relation to the world pattern of cost and probably unrealistic. It also shows that the generation cost cannot be used separately to determine the Belo Monte dam's economic feasibility. There is the need to include other costs, such as: socio environmental degradation and control, financial compensation for using the hydraulic resources, transmission and thermal backup stations, beyond, evidently, generation cost for assuring the credibility of the Belo Monte hydropower plant's economic analysis. (author)

  11. Laboratory developments of a diagonal turbine for medium head small hydro power plants (25 - 100 m). Final report; Turbines diagonales. Programme de developpement d'une turbine hydraulique diagonale destinee a equiper les petites centrales a moyenne chute (25 a 100 m) - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Choulot, A.; Denis, V.

    2009-11-15

    power plant, to use the reserved flow characterized by a constant discharge of 500 l/s and a variable head, from 24.5 to 45.0 m. The delivery of the turbine is planned in the first semester of 2013. (authors)

  12. Power market liberalisation: an opportunity for the hydroelectricity?

    International Nuclear Information System (INIS)

    Loth, P.

    2001-01-01

    This article discusses the future of hydroelectricity in the light of the ongoing liberalisation of the European power market. Compared to fossil electricity, hydroelectricity is a renewable energy source, has a limited impact on the environment, is able to meet strong variations of power demand, but is a little bit more costly. Hydroelectric companies expect the introduction of a quality label for their product as well as the increasing awareness of consumers for environmental aspects to become strong incentives for them to subscribe on green energy despite its higher cost. The cost difference will also be partly reduced by the introduction of a pollution tax on fossil energy sources. Figures on hydroelectricity capacity production, currently and in the near future, in the countries surrounding the Alps are presented. As an example, the business strategy of a Swiss electricity utility is shortly described

  13. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  14. Ecological improvements to hydroelectric power plants under EEG. Guidance to environmental verifiers and water rights authorities; Oekologische Verbesserungsmassnahmen an Wasserkraftanlagen gemaess EEG. Leitfaden fuer Umweltgutachter und Wasserrechtsbehoerden

    Energy Technology Data Exchange (ETDEWEB)

    Meyr, Christoph; Pfeifer, Hansjoerg [EVIT GmbH Ingenieurbuero Unternehmensberatung, Muenchen (Germany); Schnell, Johannes; Hanfland, Sebastian [Landesfischereiverband Bayern e.V., Muenchen (Germany)

    2011-11-15

    The use of hydropower as a renewable form of energy is experiencing a renaissance due to the energy transition in Bavaria. The fishery evaluate not uncritically this development, because hydroelectric plants generally normally represent a considerable intervention in water and therefore in the habitat of the fish. In this case it should be noted that just often not even the minimum requirements of ecology are fulfilled at existing plants according to the Federal Water Act. [German] Die Nutzung der Wasserkraft als regenerative Energieform erlebt aufgrund der Energiewende in Bayern derzeit eine Art Renaissance. Die Fischerei bewertet diese Entwicklung nicht unkritisch, stellen Wasserkraftanlagen in der Regel doch einen erheblichen Eingriff in Gewaesser und somit den Lebensraum der Fische dar. Dabei ist festzustellen, dass gerade an bestehenden Anlagen haeufig nicht einmal die Mindestanforderungen der Oekologie erfuellt werden, wie sie das Wasserhaushaltsgesetz vorschreibt.

  15. Emergetic analysis of the electrolytic hydrogen production using the secondary energy from the Itaipu Hydroelectric Power Plant; Analise emergetica da producao de hidrogenio eletrolitico aproveitando a energia vertida nao turbinada da Usina Hidroeletrica de Itaipu

    Energy Technology Data Exchange (ETDEWEB)

    Agarussi, Maria Alessandra Silva Nunes; Espinola, Michel Osvaldo Galeano [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Planejamento de Sistemas Energeticos

    2006-07-01

    Due to the possibility of increase in the energy market in a few years and awareness of the necessity of using the secondary energy in hydroelectric power plants and also concerned about the environmental problems related to energy enterprises, the present paper develops the emergy analyses of electrolytic hydrogen production in the Itaipu Power Plant located in the countries of Brazil and Paraguay. The emergy analyses despite being unknown by the major people and technicians responsible for the development of Environmental Impacts Studies, named EIA/RIMAS in Brazil, represents a way to fulfill all requirements imposed by law and government and also an important manner to internalize externalities in the evaluation of all variables involved in the execution and maintenance of natural and artificial processes. Afterwards, this database can be used to be compared with other actual processes of producing and supplying energy, guiding stake holders when deciding where and how to implement and take advantage of available energy sources. This work aims to evaluate with emergetic criteria the research done by Antonio Carlos Fonseca Santos Jr.: Analysis of the Economic Feasibility of Hydrogen Production in Hydroelectric Power Plants: A Case Study at Itaipu. (author)

  16. 'Neue Muehle' at Kassel. Modern hydroelectric power plant, protected historical industrial plant, technical museum; Die ''Neue Muehle'' in Kassel. Moderne Wasserkraftanlage, Industriedenkmal und technisches Museum

    Energy Technology Data Exchange (ETDEWEB)

    Hamerak, K.

    2000-07-01

    Rumours have it that the Staedtische Werke der Stadt Kassel paid DM 4 million for reactivation of the 'Neue Muehle' hydroelectric power station. This equals a specifi installed cost of 4 x R10{sup 6} DM/310 kW=12 903 DM/kW. This includes the cost of restoring the historical power station components. The new power plant will provide about 850 - 1000 private households with electric power. It has an expected life of 30 years, and the owner is convinced that the amortisation period will be ten years at the most. [German] In die gesamte Reaktivierung des Wasserkraftwerkes 'Neue Muehle' sollen die Staedtischen Werke der Stadt Kassel angeblich einen Betrag von 4 Mio. DM investiert haben. Damit belaufen sich die stets als brauchbare Vergleichsgroesse dienenden spezifischen installierten Anlagenkosten auf 4 x 10{sup 6} DM/310 kW=12 903 DM/kW. Darin enthalten sind aber hier ausser der reinen Energiegewinnungsanlage, welche in dieser Groessenordnung ca. 850-1 000 Privathaushalte mit elektrischer Energie zu versorgen vermag, auch die restaurierten, dem Denkmalschutz unterliegenden ehemaligen Kraftwerkskomponenten. Der Betreiber rechnet mit einer Lebensdauer von weit ueber 30 Jahren und glaubt mit Sicherheit, dass sich die gesamte Kraftanlage in spaetestens zehn Jahren amortisiert haben wird. (orig.)

  17. Hydroelectric plant integrated with foul waters

    Science.gov (United States)

    Fragiacomo, P.; Scornaienchi, N. M.

    2005-09-01

    The foul water plant, the object of this work, involves the energy exploitation of the waters from two torrents and the foul water of a town in Southern Italy. The plant layout is such that it enables, moreover, the use of the same hydraulic works to supply irrigation water in the summer to farmers who work near the proposed mini-power station. With the aim of also carrying out an economic financial evaluation, the technical choices have been economically quantified and the outcome of these analyses have provided positive indications.

  18. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  19. Hydraulic potential evaluation for micro - scale hydroelectric generation at Chicamocha River Basin - micro - scale hydroelectric plants

    International Nuclear Information System (INIS)

    Pacheco P, C.M.; Parga C, G.M.

    1995-01-01

    In development of technical and scientific cooperation treaty carried out between INEA (today Ingeominas) and Catholic University of Colombia, was elaborated the program: Potential Evaluation Hydraulic for Small hydroelectric plants; whose purpose is to carry electrical energy service to smaller populations and rural zones to all municipalities of country. To begin the program was selected the corresponding area to Chicamocha River Basin, the one which corresponds to 72 Municipalities of Boyaca and Santander Departments, due to the fact that is had good information area originating from diagnostic elaborated by INDERENA with the objective of formulating the Classification Plan and the Basin Managing. This Thesis consists of: 1. To identify all micro-basins; 2. To analyze energy demand on part of kernels of population seated in the study area; 3. To evaluate energy generating capacity of water currents and 4. As of the obtained results, to propose alternative for small hydroelectric plants design (PCH) according to defined needs

  20. The Hydroelectric Power of Necaxa and the Mexican Light and Power Co., industrial heritage at risk

    OpenAIRE

    Guzmán, Celina Peña

    2011-01-01

    This work addresses the risks to the industrial heritage of Necaxa hydroelectric complex, built by engineer Frederick Stark Pearson, through the Mexican Light and Power Company Co., in 1903 during the Diaz period. The power plant boosted the industrialization of central Mexico in most of thelast century and led to changes in the minds of the people of the towns in the Sierra Norte of Puebla where the dam was built. After a century of electrification last October 10, 2009, the President of the...

  1. Dataset of long-term monitoring of ground-dwelling ants (Hymenoptera: Formicidae) in the influence areas of a hydroelectric power plant on the Madeira River in the Amazon Basin.

    Science.gov (United States)

    Fernandes, Itanna O; de Souza, Jorge L P

    2018-01-01

    Biodiversity loss is accelerating rapidly in response to increasing human influence on the Earth's natural ecosystems. One way to overcome this problem is by focusing on places of human interest and monitoring the changes and impacts on the biodiversity. This study was conducted at six sites within the influence area of the Santo Antônio Hydroelectric Power Plant in the margins of the Madeira River in Rondônia State. The sites cover a latitudinal gradient of approximately 100 km in the Brazilian Amazon Basin. The sampling design included six sampling modules with six plots (transects) each, totaling 30 sampling plots. The transects were distributed with 0 km, 0.5 km, 1 km, 2 km, 3 km and 4 km, measured perpendicularly from the river margin towards the interior of the forest. For sampling the ground-dwelling ants, the study used the ALL (ants of the leaf litter) protocol, which is standardized globally in the inventories of ant fauna. For the purpose of impact indicators, the first two campaigns (September 2011 to November 2011) were carried out in the pre-filling period, while campaigns 3 to 10 (February 2012 to November 2014) were carried out during and after the filling of the hydroelectric reservoir. A total of 253 events with a total of 9,165 occurrences were accounted during the monitoring. The ants were distributed in 10 subfamilies, 68 genera and 324 species/morphospecies. The impact on ant biodiversity during the periods before and after filling was measured by ecological indicators and by the presence and absence of some species/morphospecies. This is the first study, as far as we know, including taxonomic and ecological treatment to monitor the impact of a hydroelectric power plant on ant fauna. Until recently, most studies conducted on hydroelectric plants, located in the Amazon Basin, were carried out after the implementation of dams in order to assess their impacts on the environment and biodiversity (Benchimol and Peres 2015, Latrubesse et al. 2017

  2. High Falls Hydroelectric Plant feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Diezemann, Gustav A.

    1979-07-01

    This study was made in order to determine if re-activating the retired High Falls Hydro Station in New York would result in a more economical generation of some of the power required in the Central Hudson System than is being obtained with the oil-burning thermal plants. The findings show that the construction of a new plant is more economical than rehabilitation of the existing station. All new construction schemes are marginally unattractive at today's costs but are found to become profitable within a short period as alternative energy sources escalate in price. A new powerhouse with an installed capacity of 2390 kW proved most economical, and its construction is recommended.

  3. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Science.gov (United States)

    2010-06-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Hydroelectric Power Development at Ridgway Dam... accept proposals, select lessee, and contract for hydroelectric power development at Ridgway Dam. SUMMARY...-Federal development of hydroelectric power at Ridgway Dam, a feature of the Dallas Creek Project...

  4. 76 FR 58837 - Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-09-22

    ... Lessee, and Contract for Hydroelectric Power Development at Caballo Dam, Rio Grande Project, New Mexico... Power Administration (Western), will consider proposals for non-Federal development of hydroelectric power at Caballo Dam, a feature of the Rio Grande Project. Reclamation is considering such hydroelectric...

  5. The experience of Electricity Municipal Department of Pocos de Caldas, state of Minas Gerais, Brazil, in conception and construction of Antas 2 hydroelectric power plant: a hand-made power plant; A experiencia do Departamento Municipal de Eletricidade de Pocos de Caldas na concepcao e construcao da Usina Hidreletrica Antas 2: uma usina concebida e realizada na ponta do lapis

    Energy Technology Data Exchange (ETDEWEB)

    Moraes, Cicero Machado de [Departamento Municipal de Eletricidade de Pocos de Caldas, MG (Brazil); Nasseh, Oscar [Mecanica Pesada S.A., Taubate, SP (Brazil); Hellmuth, Harald [Siemens S.A. (Brazil)

    1993-12-31

    The Antas 2 hydroelectric power plant, located in Pocos de Caldas, state of Minas Gerais, Brazil, is under construction and have deadline to start operation in the beginning of 1994. Considered a high-head plant, with 165,05 m of fall, Antas 2 have three generation units of 5,7 MW and will supply a residential and industry demand of electric energy. This paper presents that the construction of an energy profit with this capacity can be performed under the mostly updated technologies with low costs, resulting in a high productivity, with reliance and asserted rentability profit 1 tab.

  6. Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, B.-M.; Lew, D.; Milligan, M.

    2011-07-01

    This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

  7. Estimation of free-flowingmicro hydroelectric power stations in Krasnoyarsk region

    OpenAIRE

    Kachina, E.; Botcharova, E.

    2010-01-01

    The external factors defining expediency of using micro hydroelectric power stations are considered. Exploration of areas of Krasnoyarsk region, which are suitable for usage of micro hydroelectric power stations is carried out. The market of primary real small hydroelectric engineering in Krasnoyarsk region is defined.

  8. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  9. Anthropic contribution on pollution in hydroelectric reservoirs: the case of Sao Simao's hydroelectric power plant - GO/MG, Brazil; Contribuicao antropica na poluicao de reservatorios hidreletricos: o caso da Usina Hidreletrica de Sao Simao - GO/MG

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, Gizele Araujo Borba da

    2010-02-15

    This study aimed to evaluate the contribution of anthropogenic pollution in hydroelectric reservoirs through a case study of the Sao Simao Hydropower. The literature relates the problem of eutrophication with the addition of nutrients (nitrogen and phosphorus) in excess, resulting in water pollution. Through data for both tributary rivers and the reservoir, it was found that the Sao Simao dam presents a framework for eutrophication. We made an analysis to see which tributary rivers were the main sources of nutrients released into the waters of the reservoir and a survey of possible human activities that are contributing to the intake of nutrients in these tributaries. (author)

  10. Hydro-electric power - potential and limitations

    International Nuclear Information System (INIS)

    Amundsen, T.

    1995-01-01

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world's growing population, the unavoidable conclusion is that more power is to be produced. 3 figs

  11. Technological characterization of basaltic rocks of Canoas I Hydroelectric Power Plant, Paranapanema river, Sao Paulo - Parana states, Brazil; Caracterizacao tecnologica das rochas basalticas da Usina Hidroeletrica Canoas I, Rio Paranapanema, SP/PR

    Energy Technology Data Exchange (ETDEWEB)

    Marrano, Antonio

    1997-07-01

    Basaltic litotypes from the rock mass foundation of Canoas I Hydroelectric Power Plant were submitted to technological characterization tests, in order to verify their suitability as construction material. Physical and mechanical properties (density, porosity, water absorption, ultrasonic velocity, compressive and splitting tensile strength, among others) were determined, besides petrographic analyses. Weather ability tests were also performed, not only through wetting-drying cycles and by immersion in ethylene glycol but by outdoor exposure as well, using crushed and core drilled specimens. Detailed procedures for the weather ability test using core specimens from rotary drilling are given. It is analyzed the influence of a geological feature (fault zone, about 10 meters thick and 20 degrees dip), that occurs in the rock mass foundation, on the technological properties of these rocks. Basaltic litotypes selected as construction material are then pointed out. (author)

  12. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P.; Croci, S.; Ernst, J.-R.

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  13. Analysis of the impact of connecting a larger number of small hydroelectric power plants to the short-circuit currents values and relay protection system of distribution network

    Directory of Open Access Journals (Sweden)

    Sučević Nikola

    2017-01-01

    Full Text Available In this paper the influence of a large number of small hydro power plants on the short-circuit currents is analysed, as well as the operation of the relay protection system within the real distribution network in Serbia. The necessary modification of the existing protection functions, as well as the implementation of the new proposed protection functions, are presented and discussed. Network modeling and analysis are performed using the program tool DIgSILENT PowerFactory.

  14. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  15. 75 FR 54621 - Lockhart Power Company-South Carolina Pacolet Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2010-09-08

    ...] Lockhart Power Company--South Carolina Pacolet Hydroelectric Project; Notice of Proposed Restricted Service... Historic Places at the Pacolet Hydroelectric Project Nos. 2621 and 12770. The programmatic agreement, when... the Pacolet Hydroelectric Project would be fulfilled through the programmatic agreement, which the...

  16. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  17. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Science.gov (United States)

    2011-11-22

    ... Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD Hydroelectric LLC (transferor) and... Red Rock Hydroelectric Project, No. 12576, located on the Des Monies River in Marion County, Iowa...

  18. Wind energy and Swiss hydroelectric power

    International Nuclear Information System (INIS)

    Ott, W.; Baur, M.; Fritz, W.; Zimmer, Ch.; Feldmann, J.; Haubrich, H.-J.; Dany, G.; Schmoeller, H.; Hartmann, T.

    2004-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a study made to analyse the possible changes in the European electricity supply system, in particular with reference to the increasing amount of wind-generated electricity. Also, the role of peak-power and the optimisation potential for Swiss hydropower was examined. The part to be played by Swiss wind power in the future and the government's sustainability strategy is also looked at. The report looks at electricity dealing in the European context and introduces a method of assessment for Swiss hydropower. The report's conclusions and recommendations cover the increasing importance of energy storage in hydropower schemes, the question if grid capacity is sufficient under the new conditions, the market liberalisation question and possible ecological problems that may be encountered

  19. Hydroelectric power in Switzerland: large growth potential by increasing the installed power

    International Nuclear Information System (INIS)

    Schleiss, A.

    2007-01-01

    Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates required by a new legislation to protect the rivers. The enforcement is due at latest when the present licenses for water utilization expire. On the other hand, the installed (peak) power might be further increased by 50% by retrofitting the existing installations and constructing the pumped-storage plants currently at the planning stage

  20. Actual state and perspectives of the small hydroelectric plants in Colombia

    International Nuclear Information System (INIS)

    Torres Q, E.; Castillo C, J.J.

    1995-01-01

    In this article, the actual state of the small-scale hydroelectric power plants (PCHs, abbreviations in Spanish) in Colombia in aspects as: Statistic of the water in Colombia, a brief historical review and the characteristics of the PCHs in Colombia, is present. The development PCHs, the executing projects and the actions that has been develop by the INEA (Institute of Nuclear Sciences and the Alternative Energies) is described

  1. Implantation of hydroelectric power plants and the environmental licensing: the importance of the articulation among the electrical and environment sectors in Brazil; A implantacao de usinas hidreletricas e o processo de licenciamento ambiental: a importancia da articulacao entre os setores eletrico e de meio ambiente no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Facuri, Micheline Ferreira

    2004-07-01

    Hydroelectric power plants stand for the main generation source in Brazil. The basis of the national generator park installed capacity is the exploration of hydraulic potency when the Brazilian energetic die is observed. The atmosphere that the Brazilian electric sector is found now asks for new generator units. In this sense, it would decrease energy offer deficit risk, which collaborates to the electric energy offer expansion effort. This research aims to join and to comment on a group of data and information regarding to the process of implantation of hydroelectric power plants already bid. It includes up to date data on hydroelectric power plants bid since 1996. This data describe the main implications found in the enterprises that are late in their schedules. It shows that the greater the environmental management instruments incorporation in hydroelectric projects planning process, the greater the possibility of new hydraulic generation enterprises with better quality of environmental studies implantation. In this way, it makes even better the process of environmental licensing that could occur in a more adequate deadline. As a result, 28 - out of 54 - enterprises bid are found with environmental problems, which represent 43.30% of bestowed potency. It is possible to infer, thus, that there is a need of more interaction between the electric and the environmental sectors. After analyzing the results, it is concluded that the generation enterprises environmental licensing has been worrying the electric sector agents. This happens due to the need of refinement on environmental studies or due to the need of bureaucracy to get licenses - mainly regarding to judicial actions and environmental issues. Finally, the adequate identification of environmental licensing drags allows a more efficient process to hydroelectric power plants implantation, which generates more consistent and faster results. (author)

  2. Enlarging the underground hydroelectric plant at Villarino, Spain

    Energy Technology Data Exchange (ETDEWEB)

    Oriard, L.L.

    1997-05-01

    Near the village of Villarino de los Aires, in the province of Salamanca, Spain, was an existing underground hydroelectric power plant. A major enlargement was undertaken to increase the electrical generating capacity, under a contract awarded to a joint venture of Dragados y Construcciones, S. A. (Spain), Entrecanales y Tavora, S. A. (Spain), and S.A. Conrad Zschokke (Switzerland). The enlargement required the excavation of a large and complex underground system of tunnels, shafts and chambers adjacent to existing facilities and interconnected with these facilities. The existing machine hall and transformer chamber were both extended, requiring the blasting of the existing end walls. The drilling, blasting and excavating of the underground system had to be done without damage to existing underground chambers and tunnels, or any of the existing structures, equipment or instrumentation facilities, often within just a few feet of the blasting. This required careful control of vibrations, airblast overpressures and dust. Because the only available non-electric detonating systems were found to be unreliable and unsafe, electric systems would be preferred if they could be used in a safe manner at this site. High electrical potentials existed at the site, and the facilities could not be shut down. Electrical fields were studied carefully, both in the underground environment and above the ground surface. Based on these results, it was concluded that electric detonators could be used if special blasting procedures were developed and followed. In accord with contracting practices of this Spanish agency, the contract was not awarded to the lowest bidder, but to the bidder who demonstrated the best understanding of the project and who presented the best technical proposal for conducting the work to a conclusion that would be satisfactory to the owner. The development of the technical proposal was a two-month effort for a technical group and support staff, prepared in Madrid.

  3. Innovation in hydroelectric power plant design in early twentieth century. Casto Fernández-Shaw's Engineering Architecture in La Jándula dam

    Directory of Open Access Journals (Sweden)

    A. B. Berrocal Menárguez

    2017-09-01

    Full Text Available The power plant location in the first hydroelectrial dams was a relevant issue at the end of XIX century and early XX. Different solutions were tried, some of them with very interesting aesthetics results and hydraulic and structural implications. Such is the case of La Jándula dam, inaugurated in 1930, that includes the power station inside the dam. This article examines the possible national and international inspirations of this singular solution, corroborating the hypothesis of its unprecedented nature. The collaboration of the architect Casto Fernández-Shaw in the design and integration of the engine room was decisive, because it achieved a result of an aesthetic quality and formal expressiveness unprecedented in a work of hydraulic engineering, as well as the birth of a style Shaw himself defined as architectural engineering.

  4. Effects from Tucurui Hydroelectric Power Plant on ichthyofauna composition of experimental fisheries by gillnets in Lower Tocantins River, Para State, Brazil

    International Nuclear Information System (INIS)

    Ataliba Nogueira Leite, Regina de.

    1993-01-01

    Tucurui was the first big hydroelectric built in the Brazilian Amazonia (river Tocantins, Para). About 2400 Km 2 of Tropical Rain Forest was inundated. This work attempts to describe some effects of the Tucurui dam upon fish communities of the lower Tocantins river. Surveys of fish communities on the Tocantins were carried out by INPA, before and after the impoudment. Fishes belonging to 223 species was sampled by gillnets. After the impoudment, the average of species richness of the communities was reduced in 42% and 50%, respectively downstream and upstream the dam. In the reservoir, where rapids were flooded, species specialized in this habitats virtually disappeared during and after the filling up phase. The relative contribution of the illiophagous, that dominated the samples before the dam closure, downed, while there has been a sudden widespread of fish predators species in the reservoir. These predators dominated until the third year after the impoudment. The cluster analysis provide evidences that, between the species that take advantages of the impoundment, exist a clear succession of dominance. Until the end of sampling period all the study-area remained very instable, so is difficult to foresee the future composition or structure of the communities in the area under influence of Tucurui's Hydroelectric Dam. (author). 68 refs., 46 figs., 12 tabs

  5. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  6. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-08-03

    ... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the... considered timely only if it is received in the office of the Lease of Power Privilege Coordinator by or...

  7. Nuclear Power Plants (Rev.)

    Energy Technology Data Exchange (ETDEWEB)

    Lyerly, Ray L.; Mitchell III, Walter [Southern Nuclear Engineering, Inc.

    1973-01-01

    Projected energy requirements for the future suggest that we must employ atomic energy to generate electric power or face depletion of our fossil-fuel resources—coal, oil, and gas. In short, both conservation and economic considerations will require us to use nuclear energy to generate the electricity that supports our civilization. Until we reach the time when nuclear power plants are as common as fossil-fueled or hydroelectric plants, many people will wonder how the nuclear plants work, how much they cost, where they are located, and what kinds of reactors they use. The purpose of this booklet is to answer these questions. In doing so, it will consider only central station plants, which are those that provide electric power for established utility systems.

  8. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  9. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Science.gov (United States)

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  10. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  11. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  12. 76 FR 22143 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the..., acting through the Reclamation will consider proposals for non-Federal development of hydroelectric power... hydroelectric power development under a lease of power privilege. No Federal funds will be available for such...

  13. Environmental licensing for the implementation of small hydroelectric power plants: analysis and optimization proposals for Minas Gerais state, Brazil; Licenciamento ambiental para implantacao de pequenas centrais hidreletricas: analise e propostas de otimizacao para Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Pedreira, Adriana Coli [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Programa de Pos-graduacao em Engenharia da Energia], e-mail: adriana@unifei.edu.br; Dupas, Francisco Antonio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais], e-mail: dupas@unifei.edu.brT

    2004-07-01

    This document presents the legal and institutional aspects of the environmental licensing for the implementation of small hydroelectric power plants (SHPP). Laws and doctrine related to the topic were researched and concluded for Minas Gerais State with the help of a survey with the enterprises and institutions involved in the process to find out the difficulties that influence the delay of the analysis of the SHPP. It also highlights the importance of environmental zoning as a tool of environmental management for the procedure to obtain these licenses. The results show that 80% of the cases, the institutions do not respect the deadlines, 40% of the studies presented by the enterprises are insufficient, 60% there is lack of human resource and technical capacities of the environment institutions, and 80% non-fulfilment of the laws and non-integration of the institutions. Finally, the study concludes that the difficulties to obtain these licenses are based on the facts mentioned which are, the non-integration of the institutions and also, being recent, on the inexperience of the actors involved. Therefore, it is suggested that deadlines should be imposed for the institutions and the enterprises. There should be training, fund raising for the hiring of technicians, fulfillment of the law and above all, transparency in order to supply the electrical energy demand and guarantee the sustainable development. (author)

  14. The Victoria Project, Sri Lanka: Victoria Power-Station. [Hydroelectric power

    Energy Technology Data Exchange (ETDEWEB)

    Creber, B. (Sir Alexander Gibb and Partners (GB))

    1991-04-01

    The Victoria Hydroelectric Power-Station forms part of the Victoria Project on the Mahaweli Ganga in Sri Lanka and it provides the country's largest single power source. The Paper describes the planning, design and construction of the civil engineering works, including problems encountered, and also describes, in outline, the electrical and mechanical works. (Author).

  15. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Science.gov (United States)

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  16. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ... for Hydroelectric Power Development at the Granby Dam Outlet, a Feature of the Colorado-Big Thompson... Reclamation, will consider proposals for non-Federal development of hydroelectric power at Granby Dam Outlet of the C-BT, Colorado. Reclamation is considering such hydroelectric power development under a lease...

  17. 78 FR 48185 - Notice of Intent To Contract for Hydroelectric Power Development on the San Juan-Chama Project...

    Science.gov (United States)

    2013-08-07

    ... Intent To Contract for Hydroelectric Power Development on the San Juan-Chama Project, New Mexico AGENCY... contract for hydroelectric power development on the San Juan-Chama Project. SUMMARY: Current Federal policy... Power Administration (Western), will consider proposals for non-Federal development of hydroelectric...

  18. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Science.gov (United States)

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...

  19. University-Company Cooperation in a Hydroelectric Plant: Cooperation Study in Environmental Management

    Directory of Open Access Journals (Sweden)

    Fabricio Mussi

    2017-05-01

    Full Text Available Hydroelectric power plants are considered strategic for the country when considering their relevance and impact on other sectors of the economy. However, the dynamics of the operation of a plant, its support structure and power generation activities can cause impacts on the environment, which must be constantly monitored in order to mitigate any environmental risks. The purpose of this study is to examine the partnership relations between a plant by menas of the creation of a department within the environmental management and universities and research institutes to identify specific partnerships in environmental management and hydroelectric plants. Six projects have been selected for analysis, four of them related to projects with universities and two related to cooperation with research institutes. The focus of the analysis was restricted to the main points observed in the management of these partnerships, which are: (a motivation for establishing partnerships, (b the composition of the estimated costs for implementing these partnerships, (c the difficulties of reconciling technical management and financial management, and (d the measurement of results and contributions from these interactions. Administrative practices of management of partnerships were also analyzed in the stages preceding cooperation for cooperation and further cooperation. Although other such studies are needed to strengthen the findings presented, one can conclude that the purposes of the establishment of cooperation in environmental management differ from those observed in other fields of knowledge such as engineering and biotechnology, for example.

  20. West Kootenay Power Ltd. : Application to sell its hydroelectric generation assets : Decision

    International Nuclear Information System (INIS)

    Ostergaard, P.; Bradley, P.G.; Clemenhagen, B.L.

    2001-01-01

    An investor-owned electric utility providing wholesale and retail service in the West Kootenay and South Okanagan regions of British Columbia, West Kootenay Power Ltd. (WKP) sought the approval from the British Columbia Utilities Commission to sell the four hydroelectric power plants and related facilities to Kootenay River Power Corporation (KRP), and for the purchase by WKP of the output of these plants under a 60-year power purchase agreement. The four hydroelectric plants have a combined rated capacity of approximately 214 MW. Most of the energy and capacity needs of WKP are met via power purchase contracts and agreements, as winter peak loads approach 700 MW. As a result of share purchases, KRP would be 50 per cent owned by each of a provincial Crown Corporation, Columbia Power Corporation (CPC) and a wholly-owned subsidiary of the Columbia Basin Trust (CBT), CBT Energy Inc., if the transactions are allowed to proceed. Three principal agreements are of interest: the Asset Transfer Agreement (ATA), the Share Purchase Agreement (SPA), and the Power Purchase Agreement (PPA). During the review process, two main issues warranted special consideration: the treatment of the proceeds of the sale of assets, and the statutory parameters used by the Commission for the adjudication of the Application. The Application was submitted March 22, 2001, and the public hearing process began May 29, 2001. This Application is unique, in that it contains three agreements that would each require a separate review, but WKP requested that the agreements be considered in their aggregate. The Commission complied, and decided to deny the Application. Unless the terms of the sale are restructured, the transfer of assets to Kootenay River Power Corporation will not be approved by the Commission. Within one month of the date of this decision, WKP is to notify the Commission of its intentions, since it had signified that it would not proceed with the sale unless WKP shareholder receives 100

  1. What are the stakes of the hydroelectric power? Supplement: report on the renewable energies

    International Nuclear Information System (INIS)

    2003-01-01

    The document presents the regulation and the stakes concerning the hydroelectricity development in France: contribution to the greenhouse effect fight, the environment preservation, possible uses. It proposes then, a grid of a socio-economical evaluation of the projects. In this framework, the impacts of the little hydroelectric power and the possible corrective measures are described. (A.L.B.)

  2. Thermoclines: a solar thermal energy resource for enhanced hydroelectric power production.

    Science.gov (United States)

    McNichols, J L; Ginell, W S; Cory, J S

    1979-01-12

    The solar thermal energy stored in hydroelectric reservoir thermoclines is very large and greatly exceeds the gravitational hydroenergy of the surface water, even after limitations arising from the second law of thermodynamics have been taken into account. Greatly enhanced power production can be obtained at present hydroelectric facilities if heat engines are adapted to exploit this large thermal energy resource.

  3. Integration of Lithium-Ion Battery Storage Systems in Hydroelectric Plants for Supplying Primary Control Reserve

    Directory of Open Access Journals (Sweden)

    Fabio Bignucolo

    2017-01-01

    Full Text Available The ever-growing diffusion of renewables as electrical generation sources is forcing the electrical power system to face new and challenging regulation problems to preserve grid stability. Among these, the primary control reserve is reckoned to be one of the most important issues, since the introduction of generators based on renewable energies and interconnected through static converters, if relieved from the primary reserve contribution, reduces both the system inertia and the available power reserve in case of network events involving frequency perturbations. In this scenario, renewable plants such as hydroelectric run-of-river generators could be required to provide the primary control reserve ancillary service. In this paper, the integration between a multi-unit run-of-river power plant and a lithium-ion based battery storage system is investigated, suitably accounting for the ancillary service characteristics as required by present grid codes. The storage system is studied in terms of maximum economic profitability, taking into account its operating constraints. Dynamic simulations are carried out within the DIgSILENT PowerFactory 2016 software environment in order to analyse the plant response in case of network frequency contingencies, comparing the pure hydroelectric plant with the hybrid one, in which the primary reserve is partially or completely supplied by the storage system. Results confirm that the battery storage system response to frequency perturbations is clearly faster and more accurate during the transient phase compared to a traditional plant, since time delays due to hydraulic and mechanical regulations are overpassed. A case study, based on data from an existing hydropower plant and referring to the Italian context in terms of operational constraints and ancillary service remuneration, is presented.

  4. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    Science.gov (United States)

    Popa, R.; Popa, F.; Popa, B.; Zachia-Zlatea, D.

    2010-08-01

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  5. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    International Nuclear Information System (INIS)

    Popa, R; Popa, B; Popa, F; Zachia-Zlatea, D

    2010-01-01

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  6. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    Energy Technology Data Exchange (ETDEWEB)

    Popa, R; Popa, B [Faculty of Power Engineering, University Politehnica of Bucharest, 313 Spl. Independentei, sect. 6, Bucharest, 060042 (Romania); Popa, F [Institute for Hydropower Studies and Design, 5-7 Vasile Lascar, sect. 2, Bucharest, 020491 (Romania); Zachia-Zlatea, D, E-mail: bogdan.popa@rosha.r [Hidroelectrica S.A., 3 Constantin Nacu, sect. 2, Bucharest, 020995 (Romania)

    2010-08-15

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  7. 76 FR 6820 - Contract for Hydroelectric Power Development at the C-Drop, a Feature of the Klamath Project...

    Science.gov (United States)

    2011-02-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Contract for Hydroelectric Power Development at..., Interior. ACTION: Notice of intent to accept proposals, select one lessee, and contract for hydroelectric... hydroelectric power at C-Drop of the Klamath Project, Oregon. This Notice presents background information...

  8. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Science.gov (United States)

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  9. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  10. The possible negative consequences of underground dam and reservoir construction and operation in coastal karst areas: an example of the hydro-electric power plant (HEPP) Ombla near Dubrovnik (Croatia)

    Science.gov (United States)

    Roje-Bonacci, T.; Bonacci, O.

    2013-08-01

    The Ombla Spring represents a typical abundant coastal karst spring located in the vicinity of the town of Dubrovnik (Croatia). Its outlet is at an altitude of 2.5 m above sea level (m a.s.l.) and the water from it immediately flows into the Adriatic Sea. The minimum and maximum measured discharges are 3.96 m3 s-1 and 117 m3 s-1, respectively. The Trebišnjica River traverses through its catchment. The mean annual discharge, after the canalization of over 60 km of its watercourse with spray concrete (in the time span 1981-2011), is 24.05 m3 s-1. Before massive civil engineering work which took place during 1968-1980, the mean annual discharge was 28.35 m3 s-1. There is a project for construction of the hydro-electric power plant (HEPP) Ombla, which will exclusively use groundwater from the Ombla Spring karst aquifer. The underground dam will be constructed about 200 m behind the existing karst spring outflow in the karst massif, by injecting a grout curtain. The top of the grout curtain is planned to be at an altitude of 130 m a.s.l. This karst system is complex, sensitive, vulnerable and ecologically extremely valuable. The grout curtain, as well as the HEPP Ombla development, could lead to extremely dangerous technical and environmental consequences. In this paper some probable, negative consequences of the HEPP Ombla construction and development are explained. The HEPP Ombla could result in many large and hard-to-predict negative consequences which are specific for this particular HEPP, for example (1) severe spring discharge change; (2) unpredictable regional groundwater redistribution; (3) threatening of endemic fauna; (4) induced seismicity; (5) induced sinkholes; (6) occurrence of landslides; (7) conflict regarding internationally shared karst aquifers; (8) intensification of karst flash floods; (9) sea water intrusion in coastal karst aquifer; etc.

  11. Evaluation of the environmental licensing process for small hydroelectric power plants in Minas Gerais state, Brazil; Avaliacao do processo de licenciamento ambiental para pequenas centrais hidreletricas no estado de Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Pedreira, Adriana Coli

    2004-07-01

    The present situation of the environmental licensing process have been slow and complicated, in relation to the current conception of the sustainable environmental development in the country. The enterprises and impacting activities are being discussed and analysed through a great number of environmental laws and specific laws to each enterprise. These laws along with the inexperience of the enterprises and of the many institutions involved in the process are an obstacle to the development. This document presents the legal and institutional aspects of the environmental licensing for the implementation of small hydroelectric power plants. Laws and doctrine related to the topic were researched and concluded for Minas Gerais State with the help of a survey with the enterprises and institutions involved in the process to find out the difficulties that influence the delay of the analysis of the SHPP. The results show that the main barriers are the non-application of the CONAMA resolution 279/2001 to the SHPP, undetermined inspection criteria, excess of environmental programs, technical incapacity, lack of financial resources, non-integration of the institutional organs, the building of SHPP in permanent preservation area, project interfering in the fish fauna, studies an environmental impact with then reports and public audiences. Finally, concludes that the difficulties are based on the non-integration of the institutions and also, being recent, on the inexperience of the actors involved. Therefore, the study suggests on increase of the technical body in the institutions and training of their analysts; hiring of specialized consultancy, implantation of an environmental integrated system, social communication program in the planning phase, fulfillment of the CONAMA resolution 279/2001; integration of public ministry representatives in the licensing organs; application of planning and zoning, deadlines and legal imposition of these deadlines in order to supply the

  12. The Hydroelectric Business Unit of Ontario Power Generation Inc

    International Nuclear Information System (INIS)

    Gaboury, J.

    2001-01-01

    The focus of this presentation was on the generation and sale of electricity. Prior to deregulation, companies that generated electricity had a readily available customer base to whom the electricity could be sold. The author discussed some of the changes affecting the industry as a result of deregulation of the electricity market in Ontario: the increasing number of companies, as well as the increased number of generators supplying power within the province. Currently 85 per cent of the generation in Ontario is met by Ontario Power Generation (OPG) and this percentage will decrease through de-control. De-control can be achieved in a variety of ways, either through the sale of assets, leases, asset swaps. The market rules dictate that OPG not control in excess of 35 per cent of the generation supply in Ontario, OPG is examining the situation. New supply being constructed or new interconnections with neighboring markets could affect the total assets that would have to be de-controlled. OPG has a mix of generation that includes hydroelectric, fossil, and nuclear, as well as a single wind turbine. Green power, defined as electricity generation deemed less intrusive environmentally than most traditional generation, includes wind, water, landfill gas, solar and others, and could affect the mix of generation. It is expected that there will be a niche market for green power, especially when one considers the reduction in emissions. It could represent a viable option for smaller startup companies, as less capital is required. The options for selling the power, either to the spot market or by entering into a bilateral contract with another customer, were explained

  13. Counter rotating type hydroelectric unit suitable for tidal power station

    International Nuclear Information System (INIS)

    Kanemoto, T; Suzuki, T

    2010-01-01

    The counter rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures,was proposed to utilize effectively the tidal power. In the unit, the front and the rear runners counter drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the flow direction at the front runner inlet, because the angular momentum through the rear runner must coincides with that through the front runner. That is, the flow runs in the axial direction at the rear runner outlet while the axial inflow at the front runner inlet. Such operations are suitable for working at the seashore with rising and falling tidal flows, and the unit may be able to take place of the traditional bulb type turbines. The tandem runners were operated at the on-cam conditions, in keeping the induced frequency constant. The output and the hydraulic efficiency are affected by the adjustment of the front and the blade setting angles. The both optimum angles giving the maximum output and/or efficiency were presented at the various discharges/heads. To promote more the tidal power generation by this type unit, the runners were also modified so as to be suitable for both rising and falling flows. The hydraulic performances are acceptable while the output is determined mainly by the trailing edge profiles of the runner blades.

  14. Hydroelectric power and global environmental problems: benefits and environmental impacts

    International Nuclear Information System (INIS)

    Chabot, B.

    1992-01-01

    The risk of global warming is one of the most serious global environmental problems. It is due to the increase of greenhouse gases emissions, mainly because of the use of fossil fuels in the energy sector, particularly for electricity generation. At an international level, experts now agree that measures are to be taken to reduce this risk. In the energy sector, an improvement of energy efficiency and an increase of nuclear electricity generation are often presented as the best available solutions. Renewable energy sources are often presented as a solution with a negligible potential impact, and sometimes, hydro power is even forgotten, or its coasts and its potential impacts on local environment are presented as an obstacle to its positive contribution to the reduction of global warming risk. Without denying the positive impacts of other solutions, this paper explains the possibilities and the benefits of an increased use of hydroelectric power, when implemented with a minimum impact on local environment and with a synergistic effect with the rational use of generated energy, in order to have access to a sustainable development. 19 refs., 6 figs

  15. Study on the technical and economical viability in the using of the spilled turbinable energy from the Itaipu Hydroelectric Power Plant for the ammonia synthesis of the nitrogen fertilizers; Estudo da viabilidade tecnica e economica do aproveitamento da energia vertida turbinavel da usina hidreletrica de Itaipu para sintese de amonia para fertilizantes nitrogenados

    Energy Technology Data Exchange (ETDEWEB)

    Espinola, Michel Osvaldo Galeano [Universidade Nacional de Assuncao (Paraguay). Faculdade de Ciencias Quimicas]. E-mail: michelosvaldo@qui.una.py

    2008-07-01

    In many hydroelectric power plants, when the inflows are greater than the demand for energy, a portion of the water that could be used to generate energy is diverted to the spillway and literally wasted. This energy, designated as 'Spilled Turbinable Energy', could be used advantageously to generate other products or an energy vector that could be stored for later use, since in these occasions the dam is full. The present work studies the feasibility of using the spilled turbinable energy of the Itaipu Hydroelectric Power Plant to produce electrolytic hydrogen that, together with the nitrogen from air, is an important feedstock for the ammonia synthesis, used to produce nitrogen fertilizers. The minimum production cost of electrolytic hydrogen was estimated in US$ 0,246/m3 or US$ 2,750/kg, for a plant with capacity of 55 mil m3/h, which correspond to 247,5 MW of electrical power deriving from 82% of spilled turbinable energy and 18% of guaranteed energy. Next to that hydrogen plant it is possible to install an ammonia plant of approximately 500 t/day, operating 350 days/year, with a production cost of approximately US$ 562,81/t. This capacity is enough to supply 38,5% of the ammonia demand estimated for the region focused in the project, 1.300 t/day. Nowadays, ammonia is commercialized in the Brazilian market by approximately US$ 525,60/t. For that reason, it can be concluded that ammonia production through the association of spilled turbinable and guaranteed energy next to Itaipu Hydroelectric Power Plant is not economically feasible by the moment, mainly due to the high cost of imported electrolysers. Nevertheless, with the installation of an ammonia plant based on water electrolysis next to Itaipu Hydroelectric Power Plant, it could be avoided an annual carbon emission of 234 thousand tons, even considering methane and carbon dioxide emissions of the Itaipu's reservoir. If such project were approved by the Clean Development Mechanism, that

  16. Sustainable siting procedure of small hydroelectric plants: The Greek experience

    Energy Technology Data Exchange (ETDEWEB)

    Tsoutsos, Theocharis; Maria, Efpraxia; Mathioudakis, Vassilis [Technical University of Crete, University Campus, GR 73100 Chania (Greece)

    2007-05-15

    This paper aims to present the procedure under which a sustainable plant, like a small hydroelectric plant (SHP), can be installed and deployed, especially in countries with complicated administrative and legislative systems. Those must be defined by the rules that characterize sustainable spatial planning, which aims at the environmental protection, the insurance of better living conditions and finally at the economic development within the frame of the principle of sustainability and its three basic dimensions: social, economical and environmental. The main principles of spatial planning are accepted from the jurisprudence of the Hellenic Council of State, either as an appropriate condition for the protection of important ecosystems or as specific expression of the principle of prevention of environmental damage. In this framework it is accepted that the development is experienced, initially to a total and general planning, whose essential part is the assessment and modification of distributed land uses. Besides, the main characteristics of the siting of SHPs and the criteria demanded for their smooth integration and operation are presented. (author)

  17. Sustainable siting procedure of small hydroelectric plants: The Greek experience

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Maria, Efpraxia; Mathioudakis, Vassilis

    2007-01-01

    This paper aims to present the procedure under which a sustainable plant, like a small hydroelectric plant (SHP), can be installed and deployed, especially in countries with complicated administrative and legislative systems. Those must be defined by the rules that characterize sustainable spatial planning, which aims at the environmental protection, the insurance of better living conditions and finally at the economic development within the frame of the principle of sustainability and its three basic dimensions: social, economical and environmental. The main principles of spatial planning are accepted from the jurisprudence of the Hellenic Council of State, either as an appropriate condition for the protection of important ecosystems or as specific expression of the principle of prevention of environmental damage. In this framework it is accepted that the development is experienced, initially to a total and general planning, whose essential part is the assessment and modification of distributed land uses. Besides, the main characteristics of the siting of SHPs and the criteria demanded for their smooth integration and operation are presented

  18. Adaptation of historical technical facility on the small hydroelectric power

    OpenAIRE

    Pavlíček, Jan

    2012-01-01

    Malé vodní elektrárny jsou tématem této bakalářské práce, kterou lze dále rozdělit na tři části. První je věnována historii využívání vodní energie, základním typům hydroenergetických děl a klasifikaci vodních elektráren. Druhá část je zaměřena na malé vodní elektrárny. Získané informace jsou na konec využity v závěrečné části popisující návrh přestavby mlýna v Lomech na malou vodní elektrárnu. Small hydroelectric power stations are the topic of this bachelor thesis which can be divided in...

  19. Simplified matrix for assessment to environmental impacts on small hydroelectric power plants (SHP); Matriz simplificada para avaliar impactos ambientais em pequenas centrais hidreletricas (PCH)

    Energy Technology Data Exchange (ETDEWEB)

    Barbosa, Tania A.P. de Souza; Dupas, Francisco Antonio [Universidade Federal de Itajuba, MG (Brazil). Inst. de Recursos Naturais]. E-mails: taniabarbosa@unifei.edu.br; dupas@unifei.edu.br

    2006-07-01

    This work intends to study the methodologies used by EIA and proposes the adaptation of a simplified matrix for the assessment of environmental impacts regarding small hydropower plants. A case study of Ninho da Aguia SHP, located in the city of Delfim Moreira, MG, was used for elaborating the matrix. The methodology used the analysis of all the negative impacts and they were given combined weight based on a pre-established impact scale. The weights that were given to each impact were distributed according to the combination of features presented in the referred EIA. The results attained show that the environmental damage is reduced by 45% when the mitigating measures suggested by the EIA and by the analysis carried out by this study are applied. Besides, this preliminary proposal will make it possible for the process of getting an environmental license to be accelerated. Today, this process is considered as an investment inhibitor because of its slowness caused by the environmental organs that analyze these studies. Also, it may be used as initial guidelines regarding the environmental cost of the implementation of the enterprise. The proposed matrix shows itself as efficient because it is easy to be used and it is a useful tool for the analysis of projects that will be implemented.

  20. The performance study of a small hydroelectric power system

    International Nuclear Information System (INIS)

    Al-Jumaily, Khalil E. J.; Tawfi, Sinan Samir

    2006-01-01

    A small hydroelectric power system of an undershot waterwheel was designed, constructed and experimented in the hydraulic channel which has a sluice gate as a small dam. The constructed waterwheel diameter could be changed from 0.4 m to 0.6 m at interval steps of 0.04 m. The number of blades of the constructed waterwheel could be changed from 9 to 12 to 18 and to 36 blades. By increasing the water mass flow rate from 0.341 to 1.765 kg/s at channel cross sectional area (12.75 cm 2 ), the undershot waterwheel generated power which increased to 0.201 Watt, the mechanical efficiency increased to more than 10.8%, and the electrical efficiency increased to more than 80.6%. But the channel efficiency was decreased to 10.9%. while the volumetric efficiency was fixed at 72.9%. The waterwheel efficiency 17.25 m 2 at fixed water mass flow rate (1.765kg/s), the undershot waterwheel generated power system decreased in the following. The generator output power from 0.201 to 0.067 Watt, the mechanical efficiency reduced to 26.7% and the electrical efficiency reduced 94.4% and increased the channel efficiency from 8.6% to 100%, the volumetric efficiency from 70.9% to 75.5%, and the waterwheel efficiency from 85.7%( to 91.3%. The transitional efficiency was fixed at 97.9%. The maximum overall efficiency of the small generated power system was 6.69% at the water head 15.45 cm. The output power was 0.18 Watt. these values obtained when the number of blades 36, number of revolutions per minute 57 rpm, waterwheel diameter 0.44 m, water mass flow rate 1.765 kg/s, and channel cross sectional area 12.75 cm 2 . The theoretical extrapolation of the waterwheel diameter to 2 m with water head of 5 m gives an output generated power of 675 Watt.(Author)

  1. The Mansonia genus (diptera: culicidae) and mosquitoes growing in Tucurui hydroelectric power plant (Para - Brazil); O genero Mansonia (diptera: culicidae) e a proliferacao de mosquitos na Usina Hidreletrica de Tucurui

    Energy Technology Data Exchange (ETDEWEB)

    Radei, Wanderli Pedro [Instituto Nacional de Pesquisas da Amazonia (INPA), Manaus, AM (Brazil)

    1996-12-31

    Dams formed for hydroelectric generation normally are invaded by some kinds of aquatic plants. This plants besides the problems in navigation are also responsible for the growing of some mosquitoes. In Tucuri`s dam this plants appeared in so large quantity and make appear mosquitoes and others insects. In this study many captures were making in various places, identifying the mosquitoes and quantifying them from hour to hour. Some considerations were made about the characteristics of this mosquitoes. In conclusion the study shows that the growing of mosquito`s population can cause the appearing of epidemics not knowledge at this places with the population not prepared for them 11 refs., 6 figs., 1 tab.

  2. Efforts to Reduce the Impacts of Hydroelectric Power Production on Reservoir Fisheries in the United States

    International Nuclear Information System (INIS)

    Cada, G. F.

    1997-01-01

    Research into the environmental effects of hydroelectric power production in the United States has focused increasingly on resident and migratory fish populations. Hydropower dams and reservoirs can block fish movements in both upstream and downstream directions. These movements are essential for important stocks of anadromous and catadromous fish. In addition, some strictly freshwater fish may move long distances within a river during their life cycle.A dam can pose an impassable barrier for fish trying to move upstream unless mitigation measures in the form of ladders or lifts are provided. Fish moving downstream to the sea may become disoriented when they encounter static water within a reservoir. Both resident and migratory fish may be injured or killed by passing through the turbine or over the spillway. In the United States, a variety of organizations conduct applied research and development of measures to (1) enhance fish passage, (2) reduce the numbers of fish that are drawn into the turbine intakes, and (3) reduce the injury and mortality rates of fish that pass through the turbines. Examples of these efforts from a variety of river systems and hydroelectric power plants are described

  3. Private affairs [Canon del Pato hydroelectric project

    International Nuclear Information System (INIS)

    Moxon, S.

    1997-01-01

    The privatisation of the electric power industry in Peru has caused growth in its hydroelectric generation capacity. Increased interest in hydroelectric power, based on economic considerations, had led to decision on upgrading the two main hydropower plants which will provide almost 100 MW of extra capacity over a three year period, and provide competitively priced electric power. (UK)

  4. Finland, Sweden and Austria doubled the share of hydroelectric power in EU

    International Nuclear Information System (INIS)

    Kangas, H.

    1996-01-01

    New EU countries Finland, Sweden and Austria increased the amount of hydroelectric power produced in EU in 1995 by more than 50 % compared to the year 1994. Especially Sweden and Austria are very dependent on hydroelectric power; the share of hydroelectric power is in Austria more than 70 % and even in Sweden it was nearly 50 %. The share of hydroelectric power in 1995 the EU region was 14 % of the total power demand. Due to the new EU countries the share of hydroelectric power of the total electric power demand, which would have decreased, increased by over 3 %. The increase of the electric power demand in Finland was lowest in the EU region, about 1.0 %, while it was in Greece 5.0 % and in Spain about 4.6 %. The share of nuclear power in the EU region was about 35 % in 1995. The most nuclear power dependent country in the EU was France there the share of nuclear power of the total electric power demand was 89 %. Both Finland and Sweden increased the production of back-pressure power generation in 1995. The share of back-pressure power generation in EU in 1995 was about 50 TWh which corresponds to some 1.5 % of the total electric power demand. About 50 % of the total electric power generation in EU was produced by condensing power generation. This production increased by 10 % compared to 1994. The netimport of electric power of EU increased by 80 % in Finland and Sweden, which are large importers of electric power outside the EU region

  5. Feasibility study on the demonstrative test on the hybrid mini hydroelectric power generation technology. 2; Hybrid gata mini suiryoku hatsuden gijutsu ni kakawaru jissho shiken kanosei chosa. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    A study was made for the purpose of electrification of unelectrified zones of the mountainous areas in developing countries using extremely small hydroelectric power facilities. The target for this project is a development of a micro hydroelectric power system with a size of about 5kW, which is estimated regarding that 1 village has 80 houses and each house needs electricity of 60W. In the study, the low-head system using a weir of irrigation channels in Subang pref. of West Java state was selected by the evaluation of access, stability of flow rate, natural conditions, etc. The hydroelectric power plant is of a flow-in method in which water is taken from the left bank and is injected/discharged to the downstream of the left bank. As the hybrid complementary power source, hybrid battery with a two-hour charging time at peak and a capacity of 3.5kWh was considered. When estimating the construction cost of the hybrid micro hydroelectric power system and equalizing by durable years, the operational cost per kW is 15 times higher than the benefits which local people receive. It was judged to be difficult to say that the micro hydroelectric power system is economically feasible. It was predicted that the financial profit during the demonstrative test is good, according to a trial calculation of income from power rates and the operational cost. 18 refs., 90 figs., 53 tabs.

  6. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  7. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  8. Testing of an acoustic smolt deflection system, Blantyre hydroelectric power scheme

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The aim of this study was to test the effectiveness of an underwater acoustic barrier as a means of preventing the entry of salmon (Salmo salar) and sea trout (Salmo trutta) smolts and other fish into the water intake of a hydro-electric power (HEP) station. A secondary objective was to measure the injury rate of fish passed through the turbine, so that the risk to any fish that penetrated the acoustic barrier could also be determined. The test site, which was a 575kW Kaplan plant located at Blantyre on the R. Clyde, Lanarkshire, was selected as being representative of run-of-river sites currently being developed under the Government`s NFFO (Non-Fossil Fuel Obligation) and SRO (Scottish Renewables Order) schemes. A further objective was to disseminate information arising from the project to the scientific and HEP community. (author)

  9. Adding a small hydroelectric power plant to the drinking water supply of the Liddes community. Feasibility study; Installation d'une petite centrale hydraulique sur le reseau d'eau potable de la commune de Liddes. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The actual drinking water supply no longer satisfies the needs of the Liddes community (southwestern Switzerland). This final report prepared for the Swiss Federal Office of Energy (SFOE) describes the results of a study for an enhanced water supply system including a small hydroelectric power plant. The authors propose to collect the water of two sources of the mountain torrent Aron and to use the considerable pressure difference for power generation. Four variants have been studied differing in the exact height difference, the flow rate and the location of the turbine building. The recommended variant delivers a nominal flow of 18 l/s at difference in height of 377 m to a Pelton turbine equipped with a single injector, resulting in an electrical power output of 54 kW. Electrical power production would amount to 281,000 kWh/year and the production cost to 0.126 CHF/kWh.

  10. Bulb turbine operating at medium head: XIA JIANG case study

    Science.gov (United States)

    Loiseau, F.; Desrats, C.; Petit, P.; Liu, J.

    2012-11-01

    With lots of references for 4-blade bulb turbines, such as these of Wu Jin Xia (4 units - 36.1 MW per unit - 9.2 m rated head), Chang Zhou (15 units - 46.7 MW per unit - 9.5 m rated head) and Tong Wan (4 units - 46.2 MW per unit - 11 m rated head), ALSTOM Power Hydro is one of the major suppliers of bulb turbines operating under medium head for the Chinese market. ALSTOM Power Hydro has been awarded in November 2010 a contract by Jiang Xi Province Xia Jiang Water Control Project Headquarters to equip Xia Jiang's new hydropower plant. The power dam is located on the Gan Jiang river, at about 160 km away from Nan Chang town in South Eastern China. The supply will consist in 5 bulb units including the furniture of both the turbine and its generator, for a total capacity of 200 MW, under a rated net head of 8.6 m. The prototype turbine is a 7.8 m diameter runner, rotating at 71.4 rpm speed. For this project, ALSTOM has proposed a fully new design of 4-blade bulb runner. This paper outlines the main steps of the hydraulic development. First of all, a fine tuning of the blade geometry was performed to enhance the runner behaviour at high loads and low heads, so that to fulfill the demanding requirements of efficiencies and maximum output. The challenge was also to keep an excellent cavitation behaviour, especially at the outer blade diameter in order to avoid cavitation erosion on the prototype. The shape of the blade was optimized by using the latest tools in computational fluid dynamics. Steady state simulations of the distributor and the runner were performed, in order to simulate more accurately the pressure fields on the blade and the velocity distribution at the outlet of the runner. Moreover, draft tube computations have been performed close to the design point and at higher loads. Then, a model fully homologous with the prototype was manufactured and tested at ALSTOM's laboratory in Grenoble (France). The model test results confirmed the predicted ones: the

  11. Comparative study of the impacts of hydroelectric power plants with impacts avoided by a Virtual Plants Equivalents (VPEs) through of energy efficiency actions; Estudo comparativo dos impactos das usinas hidreletricas com os impactos evitados por uma usina virtual equivalente atraves das acoes de eficiencia energetica

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Roberto Perillo Barbosa da; Barros, Regiane Silva de [Universidade Estadual de Campinas (FEM/UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica], emails: rpbsilva@fem.unicamp.br, rsbarros@fem.unicamp.br Rossi, Luiz Antonio [Universidade Estadual de Campinas (FEAGRI/UNICAMP), SP (Brazil). Fac. Engenharia Agricola], email: rossi@feagri.unicamp.br

    2010-07-01

    This article presents a comparative study of the impacts caused by Hydroelectric Power Plants (HPPs) in relation to the impacts avoided through actions that promotes energy efficiency called Virtual Plants Equivalents (VPEs). To do so, it was considering the recent results presented by the National Program for Electric Energy Conservation (PROCEL) to the year 2008, which shows that the program actions' in this period resulted in a Virtual Plant Equivalent of 1049 MW. It was performed a survey of the values of wetland and families displaced by the construction of hydropower plants and, later, it was compared these data with the values found in the literature and, finally, it was established that the actions of energy efficiency are important instruments to avoid (or at least postpone) the social and environmental impacts directly and indirectly that affects the whole society. Thus, it is suggested that there is a stimulus in relation to energy efficiency actions, what is observed nowadays in Brazil is that these actions are negligible before the potential that exists at industrial, commercial and residential sectors. (author)

  12. Sediment management of run-of-river hydroelectric power project in ...

    Indian Academy of Sciences (India)

    Neena Isaac

    Sediment management of run-of-river hydroelectric power project in the Himalayan region using hydraulic model studies. NEENA ISAAC1,2 and T I ELDHO1,*. 1 Department of Civil Engineering, Indian Institute of Technology Bombay, Mumbai 400076, India. 2 Central Water and Power Research Station, Khadakwasla, ...

  13. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  14. The determinants of cost efficiency of hydroelectric generating plants: A random frontier approach

    International Nuclear Information System (INIS)

    Barros, Carlos P.; Peypoch, Nicolas

    2007-01-01

    This paper analyses the technical efficiency in the hydroelectric generating plants of a main Portuguese electricity enterprise EDP (Electricity of Portugal) between 1994 and 2004, investigating the role played by increase in competition and regulation. A random cost frontier method is adopted. A translog frontier model is used and the maximum likelihood estimation technique is employed to estimate the empirical model. We estimate the efficiency scores and decompose the exogenous variables into homogeneous and heterogeneous. It is concluded that production and capacity are heterogeneous, signifying that the hydroelectric generating plants are very distinct and therefore any energy policy should take into account this heterogeneity. It is also concluded that competition, rather than regulation, plays the key role in increasing hydroelectric plant efficiency

  15. Model for analysis and definition of the governor constants in hydroelectric power; Modelo para analise e definicao das constantes do regulador em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Jose Geraldo Pena de; Koelle, Edmundo; Luvizotto Junior, Edevar [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Civil. Dept. de Hidraulica e Saneamento

    1997-07-01

    This paper presents a complete mathematical and computer model which allows simulating a generic hydroelectric power plant under steady state and transitory regimes, in the extensive time, and also the analysis of the oscillating flows resulting from excitation sources present in the installation, such as vortices in the suction pipe during partial load operation.

  16. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  17. Integration of the hydroelectric power plants of Baixo Xingu, Tapajos and Medio Tocantins rivers to the interconnected Brazilian system; Integracao das UHE`s do Baixo Xingu, Tapajos e Medio Tocantins ao sistema interligado brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, J.A.M.; Abdo, J.M.M.; Vieira Filho, O.; Quijano, J.C.M.; Avila, F.T.; Steiner, A.C. [ELETRONORTE, Brasilia, DF (Brazil)

    1990-12-31

    Very big hydroelectric resources are placed in the north region of Brazil. Studies accomplished by ELETRONORTE, the utility responsible for the electric power generation and transmission within this region, have shown that the estimated average power available only in some big rivers like Xingu, Tapajos, and Tocantins is 29,500 MW. Even with the perspective of large industries planned to be implemented in the mentioned region, a big part of this available energy would not be absorbed. However, considering the lack of comparative energy sources in the other regions like southeast and northeast, the possibility of exporting electrical energy to these regions should be investigated. This paper deals with the technical and economical feasibility of integrating the north generations to the other electrical systems. The main results shown are the associated transmission evaluation, including the final costs of the energy to be delivered. Many other aspects as environmental impacts along the preionized routes, and undertakings to be held within the evolved regions, are also presented. (author). 4 refs., 5 tabs., 3 figs

  18. Feasibility determination of hydroelectric power generation at Patillas Reservoir, Puerto Rico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Huetter, J.J. Jr.

    1979-02-01

    The overall feasibility of retrofit for hydroelectric power generation at the Patillas Reservoir, an existing impoundment located near the town of Patillas, Puerto Rico, was studied. The scope of work and project intent is limited to establishing valid acceptance or non-acceptance criteria for this specific site as an example of power generation potential at existing dams of relatively low head (less than or equal to 20 m) in the United States. Information is included on hydrologic conditions at the site, retrofit plant design, economic analysis, environmental, legal, social and institutional aspects, and availability of plant equipment. It is concluded that generation of hydropower at Patillas is entirely practical and uncomplicated from an engineering viewpoint, has no adverse environmental effects and is economically justifiable for the island of Puerto Rico. The final agency or contractor roles for development are reasonably well-established. There are no prohibitory laws or regulations concerning this development. In fact, according to Puerto Rico legislation, such hydropower developments appear to be mandated. The installed capacity of the site ranges from 665 kW to approximately 1500 kW depending on extent of development of the available options. (LCL)

  19. Impact of the construction of a hydroelectric power plant on the land cover and use: study of the basin Lajeado Bonito - RS; Impacto da construcao de uma usina hidreletrica no uso e cobertura da terra: estudo da bacia Lajeado Bonito-RS

    Energy Technology Data Exchange (ETDEWEB)

    Tramontina, Juliana; Breunig, Fabio Marcelo [Universidade Federal de Santa Maria (UFSM), RS (Brazil)

    2015-07-01

    This work aims to analyze the impact of the construction of a hydroelectric power plant on land cover and use in Lajeado Bonito-RS watershed. The study evaluated the temporal evolution of land cover and use in the watershed for the period before and after to installation of hydroelectric plant Foz do Chapeco (2009 to 2010). For temporal analysis, two images were interpreted, one orbital image of High Resolution Camera (HRC) onboard of the CBERS-2B, acquired in December 29, 2009. And a high-resolution image obtained from Google Earth application, acquired at December 26, 2010. The land cover and use maps were generated by vector editing SPRING software. We found that the predominant land use related to agriculture and livestock, including bare soil. In 2009 this class accounted for 70.23% of the total area, while it come to represent 61.8% in 2010. At the same time, there was increase of areas with native forest cover, from 27.49% covered by forest in 2009, to 31% in 2010. The results showed that in both 2009 and 2010 years, approximately 49% of permanent preservation area were used inappropriately. (author)

  20. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  1. EDM - A model for optimising the short-term power operation of a complex hydroelectric network

    International Nuclear Information System (INIS)

    Tremblay, M.; Guillaud, C.

    1996-01-01

    In order to optimize the short-term power operation of a complex hydroelectric network, a new model called EDM was added to PROSPER, a water management analysis system developed by SNC-Lavalin. PROSPER is now divided into three parts: an optimization model (DDDP), a simulation model (ESOLIN), and an economic dispatch model (EDM) for the short-term operation. The operation of the KSEB hydroelectric system (located in southern India) with PROSPER was described. The long-term analysis with monthly time steps is assisted by the DDDP, and the daily analysis with hourly or half-hourly time steps is performed with the EDM model. 3 figs

  2. To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction

    Directory of Open Access Journals (Sweden)

    V. Kh. Nasibov

    2006-01-01

    Full Text Available The paper provides a technique of analytical construction of expendable characteristics and characteristics of a relative gain of water charge at a hydroelectric power station. Planning method and regression analysis have been applied for the construction of these characteristics.

  3. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested...

  4. Sediment management of run-of-river hydroelectric power project in ...

    Indian Academy of Sciences (India)

    Logo of the Indian Academy of Sciences ... Sediment management of run-of-river hydroelectric power project in the Himalayan region using hydraulic model studies ... and based on the results of the simulation, the layout design and operation schedule of such projects can be modified for better sediment management.

  5. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Science.gov (United States)

    Che Munaaim, M. A.; Razali, N.; Ayob, A.; Hamidin, N.; Othuman Mydin, M. A.

    2018-03-01

    A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP). This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW) and fall beyond of the range of a micro hydro power (5kW - 100kW) since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy) especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing water to make

  6. Environmental impact analysis of the hydroelectric power development sheme in the River Grunnaai in Seljord municipality, Telemark

    International Nuclear Information System (INIS)

    Muniz, I.P.; Bendiksen, E.; Erikstad, L.; Reitan, O.

    1997-01-01

    This report discusses the possible environmental consequences of a planned hydroelectric power development of the river Grunnaai, Norway. The consequences are found to be small, provided the proper counter measures are taken. Without counter measures, there may be moderate consequences on fish populations and botanical conditions, directly dependent on the changed water flow. The greatest value of the area concerned lies in its unspoiled wilderness character. There are extensive lists of birds and mammals and plant species registered in the river valley. 51 refs., 7 figs., 4 tabs

  7. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  8. Development of a real-time simulator of hydroelectric power plants for testing turbine control at the workshop; Entwicklung eines Echtzeitsimulators von Wasserkraftwerken zum Testen von Turbinenreglern in der Werkstatt

    Energy Technology Data Exchange (ETDEWEB)

    Harbort, T.

    1994-12-31

    The simulation examples show that the real-time simulator is suitable for verifying turbine process control at the workshop, and that it can reduce commissioning time. As the turbine process control is connected to the simulator by the same interfaces as it is to the power plant, critical operating conditions or transitions can be additionally simulated while the power plant is in operation. At the same time, power plant staff can be trained on the simulator without disrupting plant operation. (orig.) [Deutsch] Die vorgestellten Simulationsbeispiele zeigen, dass sich der Echtzeitsimulator zur Ueberpruefung der Turbinenleittechnik in der Werkstatt eignet und die Inbetriebsetzungszeiten reduzieren kann. Da die Turbinenleittechnik wie im Kraftwerk mit den gleichen Schnittstellen an den Simulator angeschlossen wird, koennen waehrend des Kraftwerkbetriebs kritische Betriebszustaende bzw. Betriebsuebergaenge mitsimuliert werden. Gleichzeitig eignet er sich als Schulungsgeraet fuer das Betriebspersonal im Kraftwerk, ohne den Anlagenbetrieb zu stoeren. (orig.)

  9. Greenhouse gas emissions from hydroelectric reservoirs

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.

    1994-01-01

    In a recent paper, Rudd et al. have suggested that, per unit of electrical energy produced, greenhouse-gas emissions from some hydroelectric reservoirs in northern Canada may be comparable to emissions from fossil-fuelled power plants. The purpose of this comment is to elaborate these issues further so as to understand the potential contribution of hydroelectric reservoirs to the greenhouse effect. More than focusing on the total budget of carbon emissions (be they in the form of CH 4 or be they in the form of CO 2 ), this requires an evaluation of the accumulated greenhouse effect of gas emissions from hydroelectric reservoirs and fossil-fuelled power plants. Two issues will be considered: (a) global warming potential (GWP) for CH 4 ; and (b) how greenhouse-gas emissions from hydroelectric power plants stand against emissions from fossil-fuelled power plants with respect to global warming

  10. The environment and the hydroelectric in Amazonia

    International Nuclear Information System (INIS)

    La Rovere, E.L.

    1992-01-01

    Some aspects about social and environmental impacts due to the hydroelectric power plants constructed in Amazonia region are presented, including considerations of energy planning and management with international example. (C.G.C.)

  11. Graphic proposal for multi thematic maps: the case of geoenvironmental diagnostic map of the Igarapava hydroelectric power plant; Proposta grafica para mapas politematicos: o caso do mapa diagnostico geoambiental da U.H.E. de Igarapava

    Energy Technology Data Exchange (ETDEWEB)

    Carmo, Valeria Amorim do [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Inst. de Geociencias. Dept. de Geografia

    1995-12-31

    This article aims at developing a graphic proposal for multithematic diagnostic map. The research`s objective is the analysis of the legends of the maps entitled Mapa Diagnostico Geoambiental da Usina Hidreletrica de Igarapava (Geoenvironmental Diagnostic map of the Igarapava Hydroelectric Plant). The analysis emphases on identifying and solving problems resulting in non-respect of the graphic transcription laws which prejudice the map`s clarity. Upon analyzing both versions of the maps, it appeared that these problems were basically resulting from bad legibility and visualization and the inadequate use of retina`s variables in the translation of graphic density and both retinian and angular separation. Graphic density was reduced and retinian separation was improved through leading a better contrast between elements of cartographic base and the Geoenvironment Synthesis Map. The angular separation was increased by using simplified forms to better visualization of the spatial structure of the information. That aspect was laos improved by creating a series of small maps to accompany the legend. Point and line elements were represented on the same map so to not prejudice hierarchical relationship between elements. All these modifications were done without affecting information extraction of the various levels of the Geoenvironmental Synthesis (BASE MAP, VEGETATION and LAND USE, HUMAN ASPECTS, CULTURAL ASPECTS AND ENVIRONMENTAL DYNAMIC). The visualization of the document as a whole was greatly improved with respect to the original proposed format. This research is but one of the various steps to the preparation of an environmental map that aims at giving clear visibility to the thousands of words of an environmental study report. (author) 4 refs., 8 figs.

  12. Use of social communication as a tool for environmental licensing of small-scale hydroelectric power plants; Uso da comunicacao social como instrumento para o licenciamento ambiental de PCH - pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Tiago Filho, Geraldo Lucio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais], e-mail: tiago@unifei.edu.br; Galhardo, Camila Rocha [Centro Nacional de Referencia em Pequenas Centrais Hidreletricas (CERPCH), MG (Brazil)], e-mail: pchnoticias@unifei.edu.br

    2006-07-01

    The present work intends to study the process of environmental licensing of the Small ones Central Hydroelectric (PCHs) through the rising of the legal framework of the referred process and to analyze the application of tools of social communication in the mitigation of the social impacts in the zone of influence of the enterprise. Through the analysis of the critical points in the environmental licensing of small hydroelectric uses and evaluation of communication actions taking in consideration the environmental costs for the enterprise. (author)

  13. Simulation technology for power plants

    International Nuclear Information System (INIS)

    Kuwabara, Kazuo; Yanai, Katsuya.

    1988-01-01

    In the simulation of nuclear power stations, there are the simulation for the training of plant operation, the plant simulation for analyzing the operation of an electric power system, the simulation for controlling a core, the simulation for the safety analysis of reactors, the simulation for the design analysis of plants and so on as the typical ones. The outline and the technical features of these simulations are described. With the increase of capacity and complexity of thermal power plants, recently the automation of operation has advanced rapidly. The chance of starting up and stopping plants by operators themselves is few, and the chance of actually experiencing troubles also is few as the reliability of plants improved. In order to maintain the ability of coping with plant abnormality, an operation supporting system is strongly demanded. Operation training simulators and used widely now, and there are the simulators for analysis, those of replica type, those of versatile compact type and so on. The system configuration, modeling techniques, training function and others of the replica type are explained. In hydroelectric plants, the behavior of water in penstocks, the characteristics of water turbines, the speed control system for water turbines and the characteristics of generators become the main subjects of simulation. These are described. (Kako, I.)

  14. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 1. Pacific Northwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteria which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.

  15. Short term hydroelectric power system scheduling with wind turbine generators using the multi-pass iteration particle swarm optimization approach

    International Nuclear Information System (INIS)

    Lee, T.-Y.

    2008-01-01

    This paper uses multi-pass iteration particle swarm optimization (MIPSO) to solve short term hydroelectric generation scheduling of a power system with wind turbine generators. MIPSO is a new algorithm for solving nonlinear optimal scheduling problems. A new index called iteration best (IB) is incorporated into particle swarm optimization (PSO) to improve solution quality. The concept of multi-pass dynamic programming is applied to modify PSO further and improve computation efficiency. The feasible operational regions of the hydro units and pumped storage plants over the whole scheduling time range must be determined before applying MIPSO to the problem. Wind turbine power generation then shaves the power system load curves. Next, MIPSO calculates hydroelectric generation scheduling. It begins with a coarse time stage and searching space and refines the time interval between two time stages and the search spacing pass by pass (iteration). With the cooperation of agents called particles, the near optimal solution of the scheduling problem can be effectively reached. The effects of wind speed uncertainty were also considered in this paper. The feasibility of the new algorithm is demonstrated by a numerical example, and MIPSO solution quality and computation efficiency are compared to those of other algorithms

  16. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  17. Hydroelectric Power : A Guide for Developers and Investors

    OpenAIRE

    International Finance Corporation

    2015-01-01

    Worldwide, hydropower is a crucial power supply option for several reasons. First, it is a renewable energy resource that can contribute to sustainable development by generating local, typically inexpensive power. Second, hydropower reduces reliance on imported fuels that carry the risks of price volatility, supply uncertainty and foreign currency requirements. Third, hydro systems can off...

  18. Analysis of the Brazilian national regulatory overview aiming the insertion of mini and micro hydroelectric power plants in the energy market; Analise do panorama regulatorio nacional visando a insercao das mini e microcentrais hidreletricas no mercado de energia

    Energy Technology Data Exchange (ETDEWEB)

    Ferrari, Jason Tibirica

    2006-07-01

    The significant expansion of Small Hydro Power plant - SHPs, in the past seven years, can be largely credited, to the incentives regulated by ANEEL, with the intention of stimulating the construction of those enterprises. Among other incentives, they deserve prominence: the authorization no payment for exploration of the hydraulic potential; the relative discharge of financial compensation for the use of hydraulic resources; and the discounts, foreseen in law, for power grid use. In the period of 1998 to October of 2004, ANEEL authorized the construction of 308 SHPs, throughout Brazil, and it allowed the refurbishment of further 46 plants. Besides, it registered 192 hydropower plants , with smaller potency or same to 1 MW, denominated MHP - Mini and Micro Hydropower Plants. Part of this universe of 500 small or miniplants, 43 are located in Sao Paulo state and the great majority in Minas Gerais. In seven years of existence ANEEL granted, 4.576 MW of SHPs and MHP. Those enterprises will contribute to the expansion of the offer of energy, with economy of the use of transmission lines, once the power plant is located, in general, close of the consumer market. The small hydropower plants and mini hydropower plants exemplify a interesting and creative alternative to assist the energy infrastructure development, respecting the other pillars, relative to the environment and the sustainable development. On this context is possible to highlight the value of renewable and less pollutant sources of energy, as well as the prevention of the negative environmental impacts. These types of projects are the ones that come close to perfection, even if considered the available technological resources of the time they were built. Moreover, it can serve as paradigm for the contemporary engineers. All those that, in fact were wrapped up in the recovery or refurbishment of those preciousness, unanimously pay tribute to the SHPs. (author)

  19. [The mosquito fauna (Diptera: Culicidae) of the environs of the Sayan-Shushenskoe hydroelectric power station].

    Science.gov (United States)

    Gornostaeva, R M

    1999-01-01

    Among females and larvae of mosquitoes collected in 1969, 1981-1984 in the area of the Sayan-Shushenskoe hydroelectric power station (140 km up the Yenisei River from the Abakan city) 5 genera and 30 species were recorded. Based on recent collections and reference data (Gornostaeva e. a., 1969; Gornostaeva, Danilov, 1986) the fauna of the region in question includes 31 species of mosquitoes (Anopheles--1, Culiseta--2, Coquillettidia--1, Aedes--22, Culex--5).

  20. The winning cards of small-scale hydroelectric power in the prevention of greenhouse effect

    International Nuclear Information System (INIS)

    Chabot, B.

    1991-01-01

    Among global environment problems, the risk of global warming is one of the most important. This risk and the associated climatic or socio-economic disorders are in relationships with the growth of greenhouse gases content in the atmosphere, connected with massive fossil fuels uses. This paper presents the advantages of small-scale hydroelectric power, often ignored, which can be a substitution energy source. 14 refs., 4 figs

  1. Nuclear power plants

    International Nuclear Information System (INIS)

    1985-01-01

    Data concerning the existing nuclear power plants in the world are presented. The data was retrieved from the SIEN (Nuclear and Energetic Information System) data bank. The information are organized in table forms as follows: nuclear plants, its status and type; installed nuclear power plants by country; nuclear power plants under construction by country; planned nuclear power plants by country; cancelled nuclear power plants by country; shut-down nuclear power plants by country. (E.G.) [pt

  2. Kansas Power Plants

    Data.gov (United States)

    Kansas Data Access and Support Center — The Kansas Power Plants database depicts, as point features, the locations of the various types of power plant locations in Kansas. The locations of the power plants...

  3. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Crew, James F. [Southern Company Generation, Birmingham, AL (United States). Hydro Services; Johnson, Herbie N. [Southern Company Generation, Birmingham, AL (United States). Hydro Services

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  4. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 3. Mid-Continent region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The US Corps of Engineers' assessment of the nation's hydroelectric resources provides a current and comprehensive estimate of the potential for incremental or new generation at existing dams and other water resource projects, as well as for undeveloped sites in the US. The demand for hydroelectric power is addressed and various related policy and technical considerations are investigated to determine the incentives, constraints, and impacts of developing hydropower to meet a portion of the future energy demands. The comprehensive data represent the effort of the Corps of Engineers based on site-specific analysis and evaluation. Summary tables include estimates of the potential capacity and energy at each site in the inventory. The number of sites and potential capacity in each state are identified, but specific detailed information is included for sites in Colorado, Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, and Wyoming.

  5. Legal obstacles and incentives to the development of small scale hydroelectric power in Ohio

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. A developer must obtain title or interest to a streambed from the proper riparian owners. Ohio provides assistance to an electric company in this undertaking by providing it with the power of eminent domain in the event it is unable to reach a purchase agreement with the riparian proprietors. The Ohio Water Law is discussed in detail, followed by discussions: Licensing, Permitting, and Review Procedures; Indirect Considerations; Ohio Public Utilities Commission; Ohio Department of Energy; Incidental Provision; and Financial Considerations.

  6. Legal obstacles and incentives to the development of small scale hydroelectric power in Connecticut

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric power in Connecticut are discussed. The Federal government also exercises extensive regulatory authority in the area and this dual system is examined from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. Connecticut follows the riparian theory of water law. Under this theory of the water law, private rights in rivers and streams are confined to the use of flowing water. A riparian proprietor does not own the water that flows by his estate. Licensing, permitting, and review procedures are discussed followed by discussion on public utilities regulation and indirect considerations.

  7. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  8. Wind energy and Swiss hydroelectric power; Windenergie und schweizerischer Wasserkraftpark

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Baur, M. [Econcept AG, Zuerich (Switzerland); Fritz, W.; Zimmer, Ch.; Feldmann, J. [Consentec GmbH, Aachen (Germany); Haubrich, H.-J.; Dany, G.; Schmoeller, H.; Hartmann, T. [Institut fuer Elektrische Anlagen und Energiewirtschaft RWTH Aachen (IAEW), Aachen (Germany)

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a study made to analyse the possible changes in the European electricity supply system, in particular with reference to the increasing amount of wind-generated electricity. Also, the role of peak-power and the optimisation potential for Swiss hydropower was examined. The part to be played by Swiss wind power in the future and the government's sustainability strategy is also looked at. The report looks at electricity dealing in the European context and introduces a method of assessment for Swiss hydropower. The report's conclusions and recommendations cover the increasing importance of energy storage in hydropower schemes, the question if grid capacity is sufficient under the new conditions, the market liberalisation question and possible ecological problems that may be encountered.

  9. Impact on the aquatic environment of hydro-peaking in hydroelectric plants

    International Nuclear Information System (INIS)

    Sabaton, C.; Lauters, F.; Valentin, S.

    1996-01-01

    There are a number of types of hydroelectric installations on French rivers. Some of these intermittently turbine water stored in dammed reservoirs, in order to use available reserves at the most opportune moment for power generation. These plants, run under 'hydro-peaking' management procedures, cause variations in discharge in river sections downstream of the restitution, on a daily or weekly scale. To answer questions concerning the impact of such variations in discharge on the aquatic environment, EDF launched a research program aimed at describing and better understanding the physical and biological phenomena related to hydro-peaking and assessing the possible impact of this type of plant management on French streams. Seven sites subjects to hydro-peaking were studied on rivers with mean flow rates lower than 20 m 3 /s (which corresponds to over 65 % of EDF hydro-peaking sites). Four themes in particular were examined: hydraulic characterization of hydro-peaking, modifications in thermal regime and water quality, response of benthic invertebrates and response of fish populations to hydro-peaking. For fish as well as for invertebrates, the role of the base discharge - in the absence of peaking flow - and that of the morphology of the river bed (and, in particular, the presence of shelter for fish) during periods of strong discharge were clearly highlighted. Impact assessment requires a precise diagnosis of the state of biocenoses. To carry out such a diagnosis, one must reason in terms of species, life phase (particularly the most sensitive phases) and population structure as well as the type of stream and the faunizone involved. A risk assessment is possible by means of simultaneous study of the morphology of the river bed and the response of the signal generated by hydro-peaking in terms of hydrology and physical characteristics downstream of the restitution. (authors)

  10. New social movements and political process: The politics of hydroelectric power in Switzerland

    Science.gov (United States)

    Lehmann, Luzia M.

    This dissertation analyzes the mobilization and impact of the ecology movement mobilizing against and challenging hydroelectric power plants in the Alps. It argues that the political process model is the most fruitful framework for such a study, linking a political system's structural constraints and opportunities to movement action via organizational resources. The mobilization process resulting in movement impact is conceived as an interactive process among social movements, authorities, other opponents, and potential counter movements. The case study method is then used to analyze three action campaigns launched against hydro power plants in Graubunden since the 1970s: Ilanz I and II, Greina, and Curciusa. In terms of the movement's narrow goal of preventing a plant, Ilanz I and II is a failure, Greina a success, and Curciusa ambiguous. Yet the author defines movement impact more broadly, including procedural, reactive and proactive substantive impact, and structural impact, changes in the alliance/conflict system, and social learning. Based on the evidence from the case studies, these factors affect movement outcome positively: visibility in the media and framing the debate, adjusting the target level and movement repertoire to the opportunity structure and the spatial concentration of the issue, proactivity, and organizational resources with a well developed division of labor, internal communication, and a non-partisan alliance system at all levels. There are two main conceptual contributions. First, the author analyzes the political opportunity structure at all levels of the federal polity--the national, cantonal, and communal--as well as the interplay among the levels. The fact that the cantonal and communal levels exhibit more elements of closure than the national level helps explain differences in movements' organizational resources, movement repertoire, targeting of movement action, and thus movement impact. Second, the author develops the spatial

  11. Assessment of power step performances of variable speed pump-turbine unit by means of hydro-electrical system simulation

    Science.gov (United States)

    Béguin, A.; Nicolet, C.; Hell, J.; Moreira, C.

    2017-04-01

    The paper explores the improvement in ancillary services that variable speed technologies can provide for the case of an existing pumped storage power plant of 2x210 MVA which conversion from fixed speed to variable speed is investigated with a focus on the power step performances of the units. First two motor-generator variable speed technologies are introduced, namely the Doubly Fed Induction Machine (DFIM) and the Full Scale Frequency Converter (FSFC). Then a detailed numerical simulation model of the investigated power plant used to simulate power steps response and comprising the waterways, the pump-turbine unit, the motor-generator, the grid connection and the control systems is presented. Hydroelectric system time domain simulations are performed in order to determine the shortest response time achievable, taking into account the constraints from the maximum penstock pressure and from the rotational speed limits. It is shown that the maximum instantaneous power step response up and down depends on the hydro-mechanical characteristics of the pump-turbine unit and of the motor-generator speed limits. As a results, for the investigated test case, the FSFC solution offer the best power step response performances.

  12. Legal obstacles and incentives to the development of small scale hydroelectric power in New York

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step the small scale hydroelectric developer must take is that of acquiring title to the real property comprising the development site. The real estate parcel must include the requisite interest in the land adjacent to the watercourse, access to the underlying streambed and where needed, the land necessary for an upstream impoundment area. Land acquisition may be effectuated by purchase, lease, or grant by the state. In addition to these methods, New York permits the use of the eminent domain power of the state for public utilities under certain circumstances.

  13. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  14. Hydroelectric power development and the ice regime of inland waters: A northern community perspective

    International Nuclear Information System (INIS)

    Gerard, R.

    1989-03-01

    Inland waters play a vital role in the life of the many small northern communities which depend in large measure on the provisions of the natural environment for their sustenance. These communities are therefore particularly vulnerable to changes in the ice regime of these waters, especially changes that are irregular. However, the north is also the site of much of Canada's hydroelectric power development and potential, developments that have a major influence on the ice regime of effected waters. As a contribution to the background information required for the necessary discussions and negotiations associated with such developments, the various aspects of the natural ice regime, the possible effects of hydroelectric development and operation on this regime, and its consequences, are briefly reviewed. The emphasis has been placed on changes that will likely be of most significance to northern communities in the bedrock-controlled country of the western Canadian Shield. The major direct, and in some circumstances life-threatening, impact of changes to the ice regime is on trafficability of the iceways that play such a vital role in the life of the communities. Hence particular emphasis has been placed on this aspect and on the formation of the slush and thin ice conditions that are the bane of over-ice travel and that are subject to unexpected changes by hydroelectric development and operation. To place these changes and their effects in some perspective, the nature of a hydroelectric development is also briefly described and an effort made to indicate the large costs incurred if these developments are restrained in their operation to avoid or mitigate some of the effects on the ice regime. 31 refs., 57 figs., 1 tab

  15. Cost assessment of efficiency losses in hydroelectric plants.

    OpenAIRE

    Manso, Juan Carlos Galvis; Padilha-Feltrin, Antonio; Yusta Loyo, Jose Maria

    2011-01-01

    Some important real-time tasks of the independent system operator (ISO) are the monitoring and control of power system events (load deviations and contingencies). These events are usually managed by the ISO using operating reserve ancillary services. These services represent an additional capacity (MW) available in generators and some interruptible loads. Generators must change their operating points in order that this capacity can remain available. These changes might lead to efficiency loss...

  16. Central hydroelectric of Santa Ana

    International Nuclear Information System (INIS)

    Pardo A, German

    2000-01-01

    The paper is related to the construction of an alternating tunnel of conduction to take advantage of the available hydraulic load among the Wiesner Plant and Santa Ana's tanks and of Suba, works required to build a hydroelectric power station with a generation capacity of approximately of 12 MW

  17. NAO influence on precipitation, river flow regimes and hydroelectric power generation in the Iberian Peninsula

    Science.gov (United States)

    Trigo, R. M.; Pozo-Vazquez, D.; Castro-Diez, Y.; Osborn, T.; Gámis-Fortis, S.; Esteban-Parra, M. J.

    2003-04-01

    the construction of major dams in the 1950s and 1960s. Similar results were obtained with potential hydro-electrical time series for Spain and Portugal. These results show that the large inter-annual variability of these three rivers flow is largely modulated by the NAO phenomena. Such modulation, associated with the recent positive trend of the NAO index, might implicate a significant decrease of the available flow. This reduction can represent an important hazard for the two Iberian economies due to its negative impact in agricultural yield and hydroelectric power production.

  18. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    International Nuclear Information System (INIS)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  19. The 'Neue Muehle' hydroelectric power plant at Kassel - identifying the turbine type; Die ''Neue Muehle in Kassel'' - Raetselraten um den Turbinentyp. Eine der letzten Knop-Turbinen im Museum ausgestellt

    Energy Technology Data Exchange (ETDEWEB)

    Lang, T.

    2001-07-01

    This power plant was constructed in the late 19th century. Its turbines have been identified as Knop turbines made by 'Eisengiesserei and Maschinenfabrik von Briegleb, Hansen and Co.' at Gotha. They are assumed to be the last of their kind. [German] Wie in den folgenden Kapiteln dargelegt, handelt es sich bei den Turbinen der ''Neuen Muehle'' um Knop-Turbinen der Gothear ''Eisengiesserei and Maschinenfabrik von Briegleb, Hansen and Co.'' und nicht um Propeller-Turbinen. Diese Bezeichnung wird heute fuer Kaplan-Turbinen mit unbeweglichen Laufradschaufeln verwendet. Francis-Turbinen mit vertikaler Welle haben einen beweglichen, ebenfalls vertikal angeordneten Leitapparat, daher scheidet dieser Turbinentyp eindeutig aus. Auch der von Hamerak anhand der Abbildungen in Ausgabe 4/2000 konstruierte Zusammenhang von Francis-Turbine und Henschel-Turbine ist infolge der Bauart prinzipiell auszuschliessen. (orig.)

  20. Hydroelectric plants: economical and ecological consequences of equipment and exploitation variants

    International Nuclear Information System (INIS)

    Maire, P.; Bansard, J.F.; Do, T.

    1995-01-01

    The increasing number of renewal demands for hydroelectric plants authorizations has raised the question of the pertinency and efficiency of the equipments used. Choices are rarely clearly justified by the petitioners. After reminding the reasons and consequences of a given choice and equipment, the necessary steps of an authorization demand are illustrated by a concrete case. It shows that some equipment-management combinations can lead to a more satisfying economical and ecological balance-sheet than those generally proposed. The popularization of computer use allows the examining services to dispose of clear and pedagogical elements to select the regular choices. (J.S.). 10 refs., 11 figs., 2 tabs

  1. Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-10-01

    This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

  2. Impacts of nuclear and hydroelectric great projects: economical, technological, environmental and social aspects

    International Nuclear Information System (INIS)

    Rosa, L.P.; Sigaud, L.; Mielnik, O.

    1988-01-01

    Some studies about the Great Impacts of Energy Sources, mainly nuclear power plant and hydroelectric power plant, in Brazil are presented. The technological, economical, social and environmental aspects are described [pt

  3. Power Plant Cycling Costs

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  4. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 5. Southeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Southeast region, the maximum physical potential for all sites exceeds 48,000 MW with an estimated average annual energy of more than 137,000 GWH. By comparison, these values represent about 9% of both the total potential capacity and hydroelectric energy estimated for the entire US. Of the total capacity estimated for the region, 11,800 MW has been installed. The remainder (36,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (13,000 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (23,200 MW). Small-scale facilities account for some 2% of the region's total installed capacity, but another 700 MW could be added to these and other small water-resource projects. In addition, 1100 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of North Carolina and South Carolina having the largest potential for incremental development at existing projects in the Southeast region. The Southeast region is composed of Arkansas, Louisiana, Mississippi, Tennessee, Alabama, Georgia, Florida, South Carolina, North Carolina, and Virginia.

  5. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 4. Lake Central region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Lake Central region, the maximum physical potential for all sites exceeds 26,000 MW with an estimated average annual energy of more than 75,000 GWH. By comparison, these values represent about 5% of both the total potential capacity and hydroelectric energy estimated for the entire US. Of the total capacity estimated for the region, 2600 MW has been installed. The remainder (23,600 MW) is the maximum which could be developed by upgrading and expanding existing projects (15,800 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (7800 MW). Small-scale facilities account for some 24% of the region's total installed capacity, but another 900 MW could be added to these and other small water-resource projects. In addition, 900 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of Michigan and Wisconsin having the largest potential for incremental development at existing projects in the Lake Central region. This Lake Central region is composed of Minnesota, Wisconsin, Michigan, Ohio, Indiana, Illinois, Kentucky, Missouri, and Iowa.

  6. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 2. Pacific Southwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental, and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Pacific Southwest region, the maximum physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy greater than 85,000 GWH. By comparison, these values represent about 6% of the total potential capacity and hydroelectric energy generation estimated for the entire US. Of the total capacity estimated for the region, 9900 MW has been installed. The remainder (23,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (6000 MW) and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (17,200 MW). Small-scale facilities account for less than 4% of the region's total installed capacity, but another 600 MW could be added to these and other small water resource projects. In addition, 600 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of California and Utah having the largest potential for incremental development at existing projects in the Pacific Southwest region. States comprising the Southwest are Arizona, California, Hawaii, Nevada, and Utah.

  7. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 6. Northeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comparison, the available data represent about 6% of the total capacity and 11% of the hydroelectric energy potential estimated for the entire US. Of the total capacity estimated for the region, 6100 MW has been installed. The remainder (27,200 MW, excluding the undeveloped capacity in the New England States) is the maximum which could be developed by upgrading and expanding existing projects (18,700 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (8500 MW). Small-scale facilities account for about 15% of the region's total installed capacity, but another 1800 MW could be added to these and other small water-resource projects. In addition, 500 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of New York, Maine, and New Hampshire having the largest potential for incremental development at existing projects in the Northeast region. West Virginia, Maryland, Delaware, New Jersey, Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island, New Hampshire, Vermont, and Maine comprise the Northeast region.

  8. [Space-time water monitoring system at the Iriklinsk hydroelectric power station].

    Science.gov (United States)

    Deriabin, D G; Poliakov, E G; Priakhina, A A; Karimov, I F

    2002-01-01

    The Microbiosensor B 17677 F test system was applied to make a space-time monitoring of the biotoxicity of water used for production and everyday purposes at the Iriklinsk hydroelectric power station (IHEPS) and to identify the leading causes determining the biotoxicity of tested samples. There were seasonal variations in the biotoxicity with the maximum in spring and with minimum in winter and spring and a relationship of the spring rise in the biotoxicity to water pH changes. There was also an association of the certain values of the biotoxicity of industrial water with the concentration of petroleum products that are major pollutants at the IHEPS. The datum points that characterize the maximum level of technogenic exposure were identified.

  9. Ticks (Acari: Ixodidae on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil

    Directory of Open Access Journals (Sweden)

    Marcelo B Labruna

    2002-12-01

    Full Text Available From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paraná river, between the states of São Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species, Boophilus (1 and Anocentor (1. A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  10. Ticks (Acari: Ixodidae) on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil.

    Science.gov (United States)

    Labruna, Marcelo B; de Paula, Cátia D; Lima, Thiago F; Sana, Dênis A

    2002-12-01

    From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paran river, between the states of S o Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species), Boophilus (1) and Anocentor (1). A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages) collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  11. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  12. Environmental impact analysis of the hydroelectric power development sheme in the River Grunnaai in Seljord municipality, Telemark; Konsekvensutredning av kraftutbyggingsprosjekt i Grunnaai i Seljord, Telemark

    Energy Technology Data Exchange (ETDEWEB)

    Muniz, I.P.; Bendiksen, E.; Erikstad, L.; Reitan, O.

    1997-12-31

    This report discusses the possible environmental consequences of a planned hydroelectric power development of the river Grunnaai, Norway. The consequences are found to be small, provided the proper counter measures are taken. Without counter measures, there may be moderate consequences on fish populations and botanical conditions, directly dependent on the changed water flow. The greatest value of the area concerned lies in its unspoiled wilderness character. There are extensive lists of birds and mammals and plant species registered in the river valley. 51 refs., 7 figs., 4 tabs.

  13. Draft guidelines for an environmental impact assessment small scale hydroelectric plant redevelopment

    International Nuclear Information System (INIS)

    1992-01-01

    A pulp and paper company in St. George, New Brunswick, is proposing to redevelop an existing hydroelectric plant built around 1900. The redevelopment proposal consists of decommissioning the existing powerhouse, constructing a new powerhouse containing a 12-MW Kaplan turbine, excavating a tailrace channel, and installing a new penstock. Other design considerations include improvements to gates in the main dam for improved flood control and modifications to the trash racks to prevent potential fish mortality. The provincial environment ministry has determined that an environmental impact assessment of the potential impacts of the redevelopment was required. Guidelines to be used in the assessment process are presented, including definition of the study boundaries, prediction of environmental effects, description of methods of mitigating and compensating for anticipated impacts, a commitment to monitoring and public consultation, and submittal of terms of reference in response to final assessment guidelines. Requirements for conducting the assessment study and content of the report are also listed. 1 fig

  14. Power plant construction. Plan, build, repair

    International Nuclear Information System (INIS)

    Rauschenbach, Monika

    2010-01-01

    Modern thermal power plants can now convert up to 90 % of the energy input into electricity. This increase in efficiency has been made possible through technological progress, but also through improvements in power plant construction. Despite a distinct rise in the proportion of renewable energies in electricity supplies, traditional power stations are still responsible for guaranteeing a large share of our energy supplies. Air pollution control, noise control, protection of natural waters and soils plus careful use of resources are the key themes in the design, construction and maintenance of power plants. Publishing house Ernst and Sohn provides competent, up-to-date information for civil and structural engineers entrusted with such challenging engineering tasks. The special issue ''Power Plant Construction'' brings together the appropriate articles from the journals ''Bautechnik'', ''Stahlbau'', ''Beton- und Stahlbetonbau'' and ''Geomechanics and Tunnelling''. The themes in this compendium cover a wide range of topics, including analysis and design of power plant installations, power station refurbishment and maintenance, special structures such as cooling towers, chimneys and boiler house frames plus the engineering aspects of coal-fired, nuclear and hydroelectric power stations. Reports on current products and projects complement the technical papers. (orig.)

  15. Feasibility of determination of low-head hydroelectric power development at existing sites. Big Blue River Co-dependent Hydroelectric Development: feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Wacker, H. Steve; Feuerberg, Stan; Lawrence, John D.; Pal, Parimal C.; Trick, Dr., William T.

    1979-03-01

    The technical, economic, environmental, safety, and financial aspects of redeveloping 7 dam sites in Nebraska for hydroelectric power generation were studied. The Big Blue River Co-dependent Hydroelectric Development was found to be a technically feasible concept, for both redevelopment and in some cases rehabilitation of seven existing sites. The proposed redevelopment project will include seven installations with a recommended nominally rated redeveloped capacity of 3920 kW ranging from 120 kW at the northernmost site in Seward County to 1500 kW at Barneston. The average annual gross generation expected from the seven redeveloped sites totals 11,555,000 kWh. It is estimated that the total cost of redevelopment of these seven sites will be $14,090,000 at 1979 price levels, providing power at an average levelized cost of about 5.3 cents per kWh based on 7% cost of money, a mid-1983 commissioning date, and allowing for funds during construction and cost escalation over a 30-year period. Rehabilitation of original installations at Crete, Dewitt, Blue Springs and Barneston is technically feasible for a total installed capacity of 1415 kW with annual average gross generation of 6,675,000 kWh. The total cost of this rehabilitation is estimated as $3,372,000 at 1979 price levels, or about 2.4 cents per kWh, levelized on a similar basis. Rehabilitation of the Barneston site alone for an installed capacity of 760 kW and annual generation of 3,581,000 kWh is both technically and economically feasible. The total estimated cost of this alternative is $668,000, providing power at a cost of about 1.9 cents per kWh at 1979 price levels. The benefit-cost ratio for Barneston rehabilitation is estimated as 1.23.

  16. Calculation of the water hammer effect of the emergency closure of ball slide valves in a high-pressure hydroelectric power plant; Druckstossberechnungen fuer Kugelschiebernotschluss-Faelle in einer Hochdruckanlage

    Energy Technology Data Exchange (ETDEWEB)

    Michler, W.

    1994-12-31

    The aim was to determine the influence of the time elapsed between the opening and subsequent emergency closure of ball slide valves on the maximum pressure peaks in the pipe. As demonstrated by the measurements taken at the plant, pressure variations over time at the plant can be accurately predicted, notwithstanding necessary simplifications. Consequently, the number of measurements can be minimized. (orig./AKF) [Deutsch] Ziel war es, den Einluss der Zeitspanne zwischen dem Oeffnen und einem darauffolgendem stoerungsbedingten Schliessen der Kugelschieber auf die maximalen Druckspitzen in der Rohrleitung zu bestimmen. Der Vergleich mit den in der Anlage durchgefuehrten Messungen zeigt, dass trotz der notwendigen Vereinfachungen eine genaue Voraussage der zeitlichen Druckschwankungen in der Anlage moeglich ist. Dadurch kann die Anzahl der Messungen in der Anlage minimiert werden. (orig./AKF)

  17. Downstream environmental impacts of dams: case study Tucurui Hydroelectric Plant, PA; Impactos ambientais a jusante de hidreletricas: o caso da usina de Tucurui, PA

    Energy Technology Data Exchange (ETDEWEB)

    Manyari, Waleska Valenca

    2007-12-15

    The hydroelectric resources of the Amazon region are considered a competitive alternative despite the structural problems they entail. Concerning the latter, plans to build large-scale dams in the region have drawn criticism mainly on account of the loss of forest cover in areas flooded by dam reservoirs and the conflicts concerning the relocation of indigenous and riverside communities in the region. This study seeks to contribute to better understanding of the environmental issue in the Amazon by focusing attention on the downstream effects of dams, which have large-scale, hitherto neglected ecological repercussions. The impact of dams extends well beyond the area surrounding the artificial lakes they create, harming rich Amazon wetland ecosystems. The morphology of dammed rivers changes in response to new inputs of energy and matter, which may in turn destroy certain biotypes. This is a remote-sensing-based case study of the Tucurui hydroelectric scheme in the Amazon state of Para. Attention is drawn to the need to take into account effects on alluvial rivers downstream from hydroelectric power plants when it comes to making planning decisions, as part of a sustainable energy policy. (author)

  18. Adding a small hydroelectric power plant to the irrigation system of the Liddes community. Feasibility study; Installation d'une petite centrale hydraulique sur le reseau d'irrigation de la commune de Liddes. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This final report prepared for the Swiss Federal Office of Energy (SFOE) examines the possibility of generating electric power with an irrigation system in the southwestern Swiss Alps. The water of the mountain torrent of Palasuit is collected at an altitude of 1620 m above sea-level in a reservoir. It is then passed through a pipeline to the distribution reservoir at 1450 m above sea-level. Among the various schemes studied, the most promising one comprises a Pelton turbine with 2 injectors that utilises a net height-difference of 162 meters. The resulting flow amounts to 150 l/s producing 197 kW of power. In order to achieve this flow, some sections of the pipeline must be replaced by ducts of a larger diameter. If the community of Liddes would obtain the permission to generate power during the whole year, the production would amount to 574,000 kWh/year and the resulting cost 0.090 CHF/kWh.

  19. Wholesale water market application for assured energy certificates allocation among hydroelectric power plants; Aplicacao de um mercado atacadista de agua para reparticao dos certificados de energia assegurada entre usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Pinto, Andre Dias

    2007-09-15

    The objective of this dissertation is to revise the methodology used in the calculation of assured energy certificates for hydro plants, in particular the relation among the objectives of reliability and market mechanisms with the certificates. The relationship between the economic signals provided by the market 'spot' of electricity with the certificates will be analyzed. It will be shown that the spot price payment does not provide the correct and necessary incentives for the energy certificates allocation in a cascade with agents belonging the different companies. Upstream reservoirs are not property compensated for the regulation of the energy production of the entire cascade and, as solution, alternative scheme to remunerate the water resources (wholesale water market) will be discussed. The assured energy certificates will be calculated with the proposed methodology and compared with nowadays practiced in the Brazilian system. (author)

  20. Study of certain economic aspects of turbomachinery for underground pumped hydroelectric storage plants

    Energy Technology Data Exchange (ETDEWEB)

    Tam, S.W.; Clinch, J.M.

    1979-12-01

    The economics of underground pumped hydroelectric storage (UPHS) were analyzed in two ways. First, the cost effects of a variety of machinery-related factors on a UPHS plant were estimated. Second, four actual turbomachinery options were evaluated in terms of those factors. Preliminary conclusions about UPHS costs are as follows: the use of advanced turbomachinery is more economical than the use of state-of-art turbomachinery; plant-construction cost and the cost of the turbomachinery itself decrease as the operating head increases (The lowest costs now occur at a head range of 1200 to 1500 m for a UPHS plant designed on the single-drop principle. A machine's high charge/discharge ratio also lowers construction cost.); and pump/turbine efficiencies and charge/discharge ratios represent very important design parameters for UPHS applications. One of the advanced options considered, a two-stage reversible pump/turbine engineered for Argonne by the Allis-Chalmers Hydro-Turbine Division, appears to have the most cost-effective design for high-head applications (1000 to 2000 m). Further development of the two-stage concept promises future heads greater than 1500 m.

  1. Submarine nuclear power plants

    International Nuclear Information System (INIS)

    Horton, C.C.

    1984-01-01

    The submarine nuclear power plant has revolutionised the strategy and tactics of under-sea warfare. Present day submarine nuclear power plants are discussed, as well as future developments. The endurance, speed, noise and diving depth of nuclear submarines are also outlined. (U.K.)

  2. Power plant chemical technology

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    17 contributions covering topies of fossil fuel combustion, flue gas cleaning, power plant materials, corrosion, water/steam cycle chemistry, monitoring and control were presented at the annual meeting devoted to Power Plant Chemical Technology 1996 at Kolding (Denmark) 4-6 September 1996. (EG)

  3. Nuclear Power Plants. Revised.

    Science.gov (United States)

    Lyerly, Ray L.; Mitchell, Walter, III

    This publication is one of a series of information booklets for the general public published by the United States Atomic Energy Commission. Among the topics discussed are: Why Use Nuclear Power?; From Atoms to Electricity; Reactor Types; Typical Plant Design Features; The Cost of Nuclear Power; Plants in the United States; Developments in Foreign…

  4. Solar thermal power plants

    International Nuclear Information System (INIS)

    Schnatbaum, L.

    2009-01-01

    The solar thermal power plant technology, the opportunities it presents and the developments in the market are outlined. The focus is on the technology of parabolic trough power plants, a proven technology for solar power generation on a large scale. In a parabolic trough power plant, trough-shaped mirrors concentrate the solar irradiation onto a pipe in the focal line of the collector. The thermal energy thus generated is used for electricity generation in a steam turbine. Parabolic trough plants can be combined with thermal storage and fossil or biomass fired heat exchangers to generate electricity even when the sun is not shining. Solar Millennium AG in Erlangen has developed the first power plant of this kind in Europe. After two years of construction the plant started operation in Southern Spain in 2008. This one and its sister projects are important steps leading the way for the whole market. The paper also covers the technological challenges, the key components used and the research and development activities concerning this technology. Solar thermal power plants are ideal for covering peak and medium loads in power grids. In hybrid operation they can also cover base-load. The Solar Chimney power plant, another striking technology for the conversion of solar into electric energy, is described briefly. The paper concludes with a look at the future - the import of solar energy from the deserts of North Africa to central Europe. (author)

  5. The Kuroshio power plant

    CERN Document Server

    Chen, Falin

    2013-01-01

    By outlining a new design or the Kuroshio power plant, new approaches to turbine design, anchorage system planning, deep sea marine engineering and power plant operations and maintenance are explored and suggested. The impact on the local environment, particularly in the face of natural disasters, is also considered to provide a well rounded introduction to plan and build a 30MW pilot power plant. Following a literature review, the six chapters of this book propose a conceptual design by focusing on the plant's core technologies and establish the separate analysis logics for turbine design and

  6. Modelling and application of modern control techniques to governor and voltage regulator systems of synchronous machines of small hydroelectric power plants; Modelagem e aplicacao de tecnicas de controle moderno a sistemas reguladores de velocidade e tensao de maquinas sincronas de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Claudio Homero Ferreira da

    2002-07-01

    In small hydroelectric plants the control system is quite simplified. It is sometimes mounted in a primitive and archaic way although it is functional. Performance of this system determines the final quality of the energy, stability and physical integrity of the apparatus as well as the whole electric system. Based on the present situation of the electric system, it is noticed a tendency in building and modernizing early small hydroelectric plants in order to increase energy supply very fast with low cost and satisfying environmental constraints. The development of mathematical tools and digital computer facilities have made possible the use of advanced automatic control structures that take into account the process stability even in presence of noise measurement and plant/model mismatch. Physical modifications in the plant are proposed in order to provide significant improvement in closed loop behaviour of the turbine speed and terminal voltage control. The decision ability and flexibility of the computer package to be developed are the major aspects that support this research. It will be intended to incorporate this control computer package into programmable logical controller. Experimental data from CEMIG's Martins Hydro Plant (4 x 2750 KVA), located in Uberlandia, Brazil, were used to identify and validate the system model. Pole placement, optimal control and model predictive control techniques were used to controller design. Perfect modeling and plant/model mismatch were considered in both presence and absence of state observers (full order and reduced order) in order to become accessible unmeasured states. Simulation results show developed controllers are promising for the system regulating. The proposed approaches offer a larger control flexibility taking into account plant/model mismatch and stability questions. These results contribute to a quality energy improvement associated to a cost reduction in energy generation process. (author)

  7. Prediction of Francis Turbine Prototype Part Load Pressure and Output Power Fluctuations with Hydroelectric Model

    Science.gov (United States)

    Alligné, S.; Nicolet, C.; Béguin, A.; Landry, C.; Gomes, J.; Avellan, F.

    2017-04-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope from the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of ν = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed for all technologies to analyse potential interactions between hydraulic excitation sources and electrical components. Three technologies have been compared: the classical fixed speed configuration with Synchronous Machine (SM) and the two variable speed technologies which are Doubly Fed Induction Machine (DFIM) and Full Size Frequency Converter (FSFC).

  8. Designing Of Permanent Magnet Synchronous Machine For Applications In Small Hydro Power Plants

    OpenAIRE

    Jayashree Sharma; Gagandeep Sharma

    2015-01-01

    The need of the hour, as we all genuinely know from the global scenario is the production of electricity from the renewable resources of energy. Most widely used among them are the solar and the wind potential. Besides these, the hydroelectric resources also play a remarkable role as hydroelectricity accounts for a major share in the energy sector throughout the world. The trend at present is of the stand alone hydro power plants wherein the turbine used is the Hydrokinetic turbin...

  9. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Science.gov (United States)

    2010-07-01

    ... with sound business principles. Section 302 of the Department of Energy Organization Act (Pub. L. 95-91... Department of the Interior, with respect to the Southeastern Power Administration; the Southwestern Power Administration; the Alaska Power Administration; the Bonneville Power Administration; and the power marketing...

  10. Fish and hydroelectricity

    International Nuclear Information System (INIS)

    Zorpette, G.

    1990-01-01

    This paper reports on the problems that hydroelectric plants have regarding fish populations. The utilities that operate these plants are finding that accommodating migrating fish presents unique engineering challenges, not the least of which involves designing and building systems to protect fish species whose migratory behavior remains something of a mystery. Where such systems cannot be built, the status of hydroelectric dams may be in doubt, as is now the case with several dams in the United States. A further twist in some regions in the possibility that certain migratory fish will be declared threatened or endangered-a development that could wreak havoc on the hydroelectric energy supply in those regions

  11. Nuclear power plant siting

    International Nuclear Information System (INIS)

    Sulkiewicz, M.; Navratil, J.

    The construction of a nuclear power plant is conditioned on territorial requirements and is accompanied by the disturbance of the environment, land occupation, population migration, the emission of radioactive wastes, thermal pollution, etc. On the other hand, a nuclear power plant makes possible the introduction of district heating and increases the economic and civilization activity of the population. Due to the construction of a nuclear power plant the set limits of negative impacts must not be exceeded. The locality should be selected such as to reduce the unfavourable effects of the plant and to fully use its benefits. The decision on the siting of the nuclear power plant is preceded by the processing of a number of surveys and a wide range of documentation to which the given criteria are strictly applied. (B.H.)

  12. Project authorization process in the thermal power stations vs in the hydroelectric power stations: two weights, two measurements?

    International Nuclear Information System (INIS)

    Comtois, Y.

    2004-01-01

    Key topics include the long tendering process, a comparison of two projects: thermal station vs. hydroelectrical station, and the solutions towards reducing the delay in obtaining authorization. (author)

  13. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    Science.gov (United States)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  14. Small-scale hydroelectric power in the southeast: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    The Southeastern conference, Small-Scale Hydroelectric Power: New Impetus for an Old Energy Source, was convened to provide a forum for state legislators and other interested persons to discuss the problems facing small-scale hydro developers, and to recommend appropriate solutions to resolve those problems. During the two-day meeting state legislators and their staffs, along with dam developers, utility and industry representatives, environmentalists and federal/state officials examined and discussed the problems impeding small-scale hydro development at the state level. Based upon the problem-oriented discussions, alternative policy options were recommended for consideration by the US Department of Energy, state legislatures and the staff of the National Conference of State Legislatures (NCSL). Emphasis was placed on the legal, institutional, environmental and economic barriers at the state level, as well as the federal delays associated with licensing small-scale hydro projects. Whereas other previously held conferences have emphasized the identification and technology of small-scale hydro as an alternative energy source, this conference stressed legislative resolution of the problems and delays in small-scale hydro licensing and development. Panel discussions and workshops are summarized. Papers on the environmental, economic, and legal aspects of small-scale hydropower development are presented. (LCL)

  15. Microbial diversity of an anoxic zone of a hydroelectric power station reservoir in Brazilian Amazonia.

    Science.gov (United States)

    Graças, Diego A; Miranda, Paulo R; Baraúna, Rafael A; McCulloch, John A; Ghilardi, Rubens; Schneider, Maria Paula C; Silva, Artur

    2011-11-01

    Microbial diversity was evaluated in an anoxic zone of Tucuruí Hydroelectric Power Station reservoir in Brazilian Amazonia using a culture-independent approach by amplifying and sequencing fragments of the 16S rRNA gene using metagenomic DNA as a template. Samples obtained from the photic, aphotic (40 m) and sediment (60 m) layers were used to construct six 16S rDNA libraries containing a total of 1,152 clones. The sediment, aphotic and photic layers presented 64, 33 and 35 unique archaeal operational taxonomic units (OTUs). The estimated richness of these layers was evaluated to be 153, 106 and 79 archaeal OTUs, respectively, using the abundance-based coverage estimator (ACE) and 114, 83 and 77 OTUs using the Chao1 estimator. For bacterial sequences, 114, 69 and 57 OTUs were found in the sediment, aphotic and photic layers, which presented estimated richnesses of 1,414, 522 and 197 OTUs (ACE) and 1,059, 1,014 and 148 OTUs (Chao1), respectively. Phylogenetic analyses of the sequences obtained revealed a high richness of microorganisms which participate in the carbon cycle, namely, methanogenic archaea and methanotrophic proteobacteria. Most sequences obtained belong to non-culturable prokaryotes. The present study offers the first glimpse of the huge microbial diversity of an anoxic area of a man-made lacustrine environment in the tropics.

  16. Potential hydroelectric power. Vertical turbine: spillway combine Broadwater Dam. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Willer, D.C.

    1979-04-23

    A feasibility study was made of the hydroelectric power potential at Broadwater Dam in western Montana. Two alternative configurations for the potential project were evaluated and the economics of four possible sources of project funding were assessed. The configurations analyzed were an apron-mounted configuration, in which the turbine-generator units are located on the downstream apron of the existing dam, and a conventional configuration, in which the units are located in a new powerhouse adjacent to the existing dam. The funding sources considered were the Department of Energy loan program, the United States Bureau of Reclamation PL-984 loan program and conventional revenue bonds, both taxable and tax-exempt. The optimal project alternative was determined to be the apron-mounted configuration. The final choice of funding would be dependent on the power purchaser. It was shown that, regardless of the configuraton or funding source selected, the project would be feasible. The cost of the apron-mounted configuration, which would consist of four turbine-generator units for a total installed capacity of 9.76 MW, was estimated as $13,250,000 with financing provided by either a PL-984 loan or tax-exempt bonds. The cost per installed kilowatt was therefore $1,350, and the cost per kilowatt-hour was 19.6 mills. The average annual energy was estimated to be 56.44 million kWh, the equivalent of approximately 87,000 barrels of oil per y. It is therefore recommended that the Montana Department of Natural Resources and Conservation proceed with the project and that discussions be initiated with potential power purchasers as soon as possible.

  17. Nuclear power plant construction

    International Nuclear Information System (INIS)

    Lima Moreira, Y.M. de.

    1979-01-01

    The legal aspects of nuclear power plant construction in Brazil, derived from governamental political guidelines, are presented. Their evolution, as a consequence of tecnology development is related. (A.L.S.L.) [pt

  18. Nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Yaziz Yunus

    1986-01-01

    A number of issues have to be taken into account before the introduction of any nuclear power plant in any country. These issues include reactor safety (site and operational), waste disposal and, lastly, the decommissioning of the reactor inself. Because of the radioactive nature of the components, nuclear power plants require a different approach to decommission compared to other plants. Until recently, issues on reactor safety and waste disposal were the main topics discussed. As for reactor decommissioning, the debates have been academic until now. Although reactors have operated for 25 years, decommissioning of retired reactors has simply not been fully planned. But the Shippingport Atomic Power Plant in Pennysylvania, the first large scale power reactor to be retired, is now being decommissioned. The work has rekindled the debate in the light of reality. Outside the United States, decommissioning is also being confronted on a new plane. (author)

  19. Impacts of hydroelectric dams on alluvial riparian plant communities in Eastern Brazilian Amazonian.

    Science.gov (United States)

    Ferreira, Leandro Valle; Cunha, Denise A; Chaves, Priscilla P; Matos, Darley C L; Parolin, Pia

    2013-09-01

    The major rivers of the Amazon River basin and their biota are threatened by the planned construction of large hydroelectric dams that are expected to have strong impacts on floodplain plant communities. The present study presents forest inventories from three floodplain sites colonized by alluvial riparian vegetation in the Tapajós, Xingu and Tocantins River basins in eastern Amazonian. Results indicate that tree species of the highly specialized alluvial riparian vegetation are clearly distinct among the three river basins, although they are not very distinct from each other and environmental constraints are very similar. With only 6 of 74 species occurring in all three inventories, most tree and shrub species are restricted to only one of the rivers, indicating a high degree of local distribution. Different species occupy similar environmental niches, making these fragile riparian formations highly valuable. Conservation plans must consider species complementarily when decisions are made on where to place floodplain forest conservation units to avoid the irreversible loss of unique alluvial riparian vegetation biodiversity.

  20. Impacts of hydroelectric dams on alluvial riparian plant communities in eastern Brazilian Amazonian

    Directory of Open Access Journals (Sweden)

    LEANDRO VALLE FERREIRA

    2013-09-01

    Full Text Available The major rivers of the Amazon River basin and their biota are threatened by the planned construction of large hydroelectric dams that are expected to have strong impacts on floodplain plant communities. The present study presents forest inventories from three floodplain sites colonized by alluvial riparian vegetation in the Tapajós, Xingu and Tocantins River basins in eastern Amazonian. Results indicate that tree species of the highly specialized alluvial riparian vegetation are clearly distinct among the three river basins, although they are not very distinct from each other and environmental constraints are very similar. With only 6 of 74 species occurring in all three inventories, most tree and shrub species are restricted to only one of the rivers, indicating a high degree of local distribution. Different species occupy similar environmental niches, making these fragile riparian formations highly valuable. Conservation plans must consider species complementarily when decisions are made on where to place floodplain forest conservation units to avoid the irreversible loss of unique alluvial riparian vegetation biodiversity.

  1. Technology and power plants

    International Nuclear Information System (INIS)

    Milora, S.

    2001-01-01

    In this paper the contributions presented at the 18 th IAEA Fusion Energy Conference in the field of technology and power plants are summarised with reference to the following distinct issues: ITER EDA Design, ITER Technology R and D, Progress Towards Advanced Performance and Steady State, Compact Cu Burning Plasma Experiments and Neutron Sources, Advanced Materials Research, Power Plant Design and Economic Forecasts, and Conclusions

  2. Hydroelectricity: an asset for a successful energy transition in France

    International Nuclear Information System (INIS)

    Galland, J.C.; Vincent, E.

    2013-01-01

    France's national debate on energy transition has served as a reminder that hydroelectric power plays a significant role in French electricity production. With installed power totalling 25400 MW at end 2012 (the second largest in Europe), France's hydroelectric plants produced 63.8 TWh last year (the third largest in Europe), almost 12% of total output. It is France's second largest means of producing electricity and it represents more than 80% of production of renewable energy. A source of energy developed a long time ago, thus benefiting from technological maturity, hydroelectricity can be produced in large quantity at the heart of France's regions, while also rendering indispensable service for the equilibrium of the French electricity system by compensating the intermittency of other renewable energy sources. The production costs of hydroelectric power are the lowest among all power generation technologies. (authors)

  3. Offshore atomic power plants

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Various merits of offshore atomic power plants are illustrated, and their systems are assessed. The planning of the offshore atomic power plants in USA is reviewed, and the construction costs of the offshore plant in Japan were estimated. Air pollution problem may be solved by the offshore atomic power plants remarkably. Deep water at low temperature may be advantageously used as cooling water for condensers. Marine resources may be bred by building artificial habitats and by providing spring-up equipments. In the case of floating plants, the plant design can be standardized so that the construction costs may be reduced. The offshore plants can be classified into three systems, namely artificial island system, floating system and sea bottom-based system. The island system may be realized with the present level of civil engineering, but requires the development of technology for the resistance of base against earthquake and its calculation means. The floating system may be constructed with conventional power plant engineering and shipbuilding engineering, but the aseismatic stability of breakwater may be a problem to be solved. Deep water floating system and deep water submerging system are conceivable, but its realization may be difficult. The sea bottom-based system with large caissons can be realized by the present civil engineering, but the construction of the caissons, stability against earthquake and resistance to waves may be problems to be solved. The technical prediction and assessment of new plant sites for nuclear power plants have been reported by Science and Technology Agency in 1974. The construction costs of an offshore plant has been estimated by the Ministry of International Trade and Industry to be yen71,026/kW as of 1985. (Iwakiri, K.)

  4. Framework of systematic sustainability assessment strategy (FSSAS) for hydroelectric power industry in Malaysia

    Science.gov (United States)

    Johan, Kartina; Turan, Faiz Mohd

    2017-08-01

    Hydroelectric power is an alternative power resource in Malaysia and always associated with negative impact on environmental, social and economy of the surrounding site. The dispute over environmental, societal and economic issues can be minimised if compliance to sustainability development requirement is included in the project as part of the project premises during planning phase. This paper suggests a framework targeted for decision-makers in charge of implementing the projects to produce hydropower the sustainable way in Malaysian context which can mitigate the risks in social, environment and economy. The framework is strategic in nature and based on project management methodology with objective to provide a ‘common language’ by having a project value as measureable for stakeholders to state their mutual agreement of what a sustainable hydropower project in the context of Malaysia and in line with the United Nations (UN) 17 Sustainable Development Goals (SDGs). The paper discusses how the proposed systematic sustainability assessment strategy (FSSAS) framework support the call for Malaysia to promote meaningful public participation in ensuring land and natural resource decisions and to address citizens’ interests which is the core idea of Environmental Democracy Index established in 2014. The paper argues that, even though it is at present impossible to define precision status of sustainability development with respect to the nature of the multi stakeholders and the lack of systematic assessment the proposed FSSAS framework can be a valuable tool because it tracks the project value as a quantitative deliverable to determine the status of the journey in sustainable development towards accomplishing the SDG under a consensus in hydropower industry of any scale over time.

  5. Nuclear power plant outages

    International Nuclear Information System (INIS)

    1998-01-01

    The Finnish Radiation and Nuclear Safety Authority (STUK) controls nuclear power plant safety in Finland. In addition to controlling the design, construction and operation of nuclear power plants, STUK also controls refuelling and repair outages at the plants. According to section 9 of the Nuclear Energy Act (990/87), it shall be the licence-holder's obligation to ensure the safety of the use of nuclear energy. Requirements applicable to the licence-holder as regards the assurance of outage safety are presented in this guide. STUK's regulatory control activities pertaining to outages are also described

  6. Three run-of-river power plants

    International Nuclear Information System (INIS)

    1992-01-01

    Three 'run-of-river' hydroelectric power plants in the Montreal area in the province of Quebec were described visually and in sound. A run-of-river generating station is one that has no reservoir behind the generating facilities. Instead of a reservoir, the generating station draws its power from the strong flow of the whole river as it passes through the turbines. The first generating station described was the Beauharnois power plant completed in 1963 which became the most powerful generating station in Canada at that time. Today, it ranks fourth after the La Grande complex. In winter, it supplies electricity primarily to the Quebec power system, but between April and November, 90 per cent of its power is destined for export. The Carillon power station on the Ottawa River, the second to be discussed in this videotape presentation, was completed in 1964 with a total generating capacity of 654 MW. Today, it is the tenth largest of its kind in Quebec. The Rivieres des Prairies generating station, the third and last one described was completed in 1930; today it has a generating capacity of 45 MW. Some of the efforts made by Hydro-Quebec to protect and enhance the natural environment were shown in action, including regular removal and recycling of debris at the gateways to the generating stations, construction of fish spawning ladders, and the control of zebra mussels

  7. Canadian Environmental Assessment Act : A comprehensive study report on the Peribonka hydroelectric power project

    International Nuclear Information System (INIS)

    2004-01-01

    This report presents the results of an environmental assessment of Hydro-Quebec's proposed project to build a new facility on the Peribonka River. The facility includes a run-of-river generating station with an installed capacity of 385 MW. The Quebec Region of the Department of Fisheries and Oceans Canada has conducted an environmental assessment of the project's effects. A summary of the project and the environment in which it will be carried out was presented along with the results of public consultations conducted by Hydro-Quebec. A summary of the main environmental effects was included along with cumulative effects and the effects caused by accidents or malfunctions that may occur. In addition, the terms and conditions of mitigation measures and follow-up programs were described and the significance of any environmental impacts were assessed. The project includes the construction of a 80 metre high dam, two dikes and one spillway upstream of the mouth of the Manouane River. The level of the reservoir would remain at close to its maximum level of 244.2 metres to optimize hydroelectric production. The power house would be integrated into the Hydro-Quebec transmission network. The main impacts of the project would result from the construction of the reservoir, the encroachment caused by associated facilities and the changes in hydrological conditions. This report outlined the current use of lands and resources for traditional purposes by Aboriginals. It also discussed the effects of natural events such as flooding, waves and climate that may cause damage to the facilities. It was determined that the project is not likely to cause significant effects on the renewable resources of the forest and the fisheries. The Department of Fisheries and Oceans, after having taking into account proposed mitigation measures, has rendered a preliminary conclusion which states that the project is not likely to have significant negative environmental effects. 29 refs., 7 tabs., 2

  8. Fish passage mitigation of impacts from hydroelectric power projects in the United States

    International Nuclear Information System (INIS)

    Cada, G.F.

    1996-01-01

    Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy's Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality

  9. Legal obstacles and incentives to the development of small scale hydroelectric power in Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Pennsylvania, there are 3 methods by which rights in water may be acquired: riparian ownership, prescription, and condemnation. These are discussed.

  10. Decision on thermal power plant can be taken this spring

    International Nuclear Information System (INIS)

    Haga, I.

    1978-01-01

    Towards the end of the 1960s it appeared that nuclear power would be the natural successor to hydroelectric power, as the latter became less attractive for further exploitation, reinforced by environmentalist opposition to several proposed hydroelectric schemes. Conventional thermal power was also considered, but one proposed stand-by plant was rejected in 1971 largely because of environmental considerations. Preliminary planning and PR information on nuclear power in the early 1970s aroused considerable opposition and a governmental commission was appointed in 1975-6 to evaluate the question of reactor safety and transport and disposal of radioactive waste, to report in 1978. It is therefore not possible to count on nuclear power as a supplement until the end of the 1980s at the earliest. Gas-fired thermal power is environmentally attractive, but at present no gas fields have been found which make this economic. Oil-fired power is quite feasible, but no political decision has yet been taken. Coal fuel, based on the Spitzbergen mines has recently become more interesting, and small power plants for the extreme north of Norway are under consideration. Finally it is pointed out that nuclear power is safer than generally assumed while fluidised bed combustion of coal in a combined steam-gas turbine plant will lead to very high thermal efficiencies. (JIW)

  11. Ardennes nuclear power plant

    International Nuclear Information System (INIS)

    1974-12-01

    The SENA nuclear power plant continued to operate, as before, at authorized rated power, namely 905MWth during the first half year and 950MWth during the second half year. Net energy production:2028GWh; hours phased to the line: 7534H; availability factor: 84%; utilization factor: 84%; total shutdowns:19; number of scrams:10; cost per KWh: 4,35 French centimes. Overall, the plant is performing very satisfactory. Over the last three years net production has been 5900GWh, corresponding to in average utilization factor of 83%

  12. Geothermal Power Generation Plant

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Tonya [Oregon Inst. of Technology, Klamath Falls, OR (United States). Geo-Heat Center

    2013-12-01

    Oregon Institute of Technology (OIT) drilled a deep geothermal well on campus (to 5,300 feet deep) which produced 196°F resource as part of the 2008 OIT Congressionally Directed Project. OIT will construct a geothermal power plant (estimated at 1.75 MWe gross output). The plant would provide 50 to 75 percent of the electricity demand on campus. Technical support for construction and operations will be provided by OIT’s Geo-Heat Center. The power plant will be housed adjacent to the existing heat exchange building on the south east corner of campus near the existing geothermal production wells used for heating campus. Cooling water will be supplied from the nearby cold water wells to a cooling tower or air cooling may be used, depending upon the type of plant selected. Using the flow obtained from the deep well, not only can energy be generated from the power plant, but the “waste” water will also be used to supplement space heating on campus. A pipeline will be construction from the well to the heat exchanger building, and then a discharge line will be construction around the east and north side of campus for anticipated use of the “waste” water by facilities in an adjacent sustainable energy park. An injection well will need to be drilled to handle the flow, as the campus existing injection wells are limited in capacity.

  13. Recuperação de área degradada por construção de hidroelétrica com adubação verde e corretivo Soil reclamation by green manure and soil ammendements in areas degraded by hydroelectric power plant construction

    Directory of Open Access Journals (Sweden)

    Marlene Cristina Alves

    2008-12-01

    Full Text Available As "áreas de empréstimo" em hidrelétricas são as áreas remanescentes da construção da fundação da barragem e podem ser consideradas áreas degradadas, pois delas foram retirados os horizontes superficiais do solo. Este trabalho teve como objetivo estudar a recuperação de um Latossolo Vermelho distrófico, degradado por construção civil (Usina Hidrelétrica de Ilha Solteira-SP, por meio de adubação verde e aplicação de calagem e gessagem. Os tratamentos constituíram-se de: testemunha (solo mobilizado e vegetação espontânea; mucuna-preta e guandu até 1994. Depois foram substituídos por feijão-de-porco; calcário + mucuna-preta; calcário + guandu até 1994. Nova substituição foi feita por feijão-de-porco; calcário + gesso + mucuna-preta e calcário + gesso + guandu até 1994. Outra substituição foi feita por feijão-de-porco. Esses tratamentos foram estabelecidos em blocos casualizados com quatro repetições: após quatro anos com os adubos verdes, um ano com milho, um ano com aveia-preta e dois anos com braquiária. Foram avaliados: pH, teores de Ca2+, Mg2+, P, K, capacidade de troca catiônica, saturação por bases e teor de matéria orgânica. Os tratamentos adotados estão recuperando os atributos químicos do solo degradado, e a mucuna-preta apresentou os melhores resultados, quando comparada ao guandu e feijão-de-porco. Os efeitos da recuperação dos atributos químicos do solo alcançaram a profundidade de 0,0-0,2 m. As técnicas adotadas para recuperação desses atributos químicos (adubação verde, calagem e gessagem no primeiro ano atingiram a profundidade do solo de 0,0-0,1 m e, somente após cinco anos, de 0,0-0,2 m.Loan areas near hydroelectric power plants can be considered degraded areas since they were stripped of their soil surface horizons. This study aimed to investigate the recovery of soil chemical attributes of a Red Latosol (Oxisol used in the embankment and fill of the hydroelectric

  14. [The social hygiene problems in the operator work of hydroelectric power station workers and the means for enhancing work capacity].

    Science.gov (United States)

    Karakashian, A N; Lepeshkina, T R; Ratushnaia, A N; Glushchenko, S S; Zakharenko, M I; Lastovchenko, V B; Diordichuk, T I

    1993-01-01

    Weight, tension and harmfulness of professional activity, peculiarities of labour conditions and characteristics of work, shift dynamics of operative personnel's working capacity were studied in the course of 8-hour working day currently accepted at hydroelectric power stations (HEPS) and experimental 12-hour schedule. Working conditions classified as "admissible", positive dynamics of operators' state, their social and material contentment were a basis for 12-hour two-shift schedule to be recommended as more appropriate. At the same time, problem of optimal shift schedules for operative personnel of HEPS remains unsolved and needs to be further explored.

  15. Nuclear power plant safety

    International Nuclear Information System (INIS)

    Otway, H.J.

    1974-01-01

    Action at the international level will assume greater importance as the number of nuclear power plants increases, especially in the more densely populated parts of the world. Predictions of growth made prior to October 1973 [9] indicated that, by 1980, 14% of the electricity would be supplied by nuclear plants and by the year 2000 this figure would be about 50%. This will make the topic of international co-operation and standards of even greater importance. The IAEA has long been active in providing assistance to Member States in the siting design and operation of nuclear reactors. These activities have been pursued through advisory missions, the publication of codes of practice, guide books, technical reports and in arranging meetings to promote information exchange. During the early development of nuclear power, there was no well-established body of experience which would allow formulation of internationally acceptable safety criteria, except in a few special cases. Hence, nuclear power plant safety and reliability matters often received an ad hoc approach which necessarily entailed a lack of consistency in the criteria used and in the levels of safety required. It is clear that the continuation of an ad hoc approach to safety will prove inadequate in the context of a world-wide nuclear power industry, and the international trade which this implies. As in several other fields, the establishment of internationally acceptable safety standards and appropriate guides for use by regulatory bodies, utilities, designers and constructors, is becoming a necessity. The IAEA is presently planning the development of a comprehensive set of basic requirements for nuclear power plant safety, and the associated reliability requirements, which would be internationally acceptable, and could serve as a standard frame of reference for nuclear plant safety and reliability analyses

  16. The influence of climate-warming on the power production of Swiss hydroelectric power stations

    International Nuclear Information System (INIS)

    Schaeppi, A.

    2006-01-01

    This article summarises an interview with Michael Piot of the Swiss Federal Office of Energy (SFOE) on a study commissioned by the office that takes a look at the influence of a possible climate warming on water flow in the Swiss alpine area. In particular, the influence of such possible changes on the Swiss power generation industry are looked at. Prognoses for climate change are reviewed, as are the results of a study made by the SFOE on energy perspectives for the period up to the year 2035. Possible changes in the alpine climate are discussed and their influence on the water household of the region is examined. Possible further and more drastic changes in the period up to 2099 are briefly commented on

  17. Emissions from hydroelectric reservoirs and comparison of hydroelectricity, natural gas and oil

    International Nuclear Information System (INIS)

    Gagnon, L.; Chamberland, A.

    1993-01-01

    When reservoirs are created, a small fraction of the flooded organic matter decomposes into humic acids, carbon dioxide (CO 2 ), methane (CH 4 ), nitrogen, phosphorus, and other elements. The major greenhouse gases produced are CO 2 and CH 4 . For northern projects, Canadian studies on emissions from hydroelectric reservoirs have reached similar conclusions: Emissions, including methane, are less than 35 kg CO 2 equivalent per MWh. Using a typical project in northern Quebec as the basis for analysis, none of the studies dispute the considerable advantages of hydroelectricity regarding greenhouse gas emissions. Taking into account all components of energy systems, emissions of greenhouse gases from natural-gas power plants are 24 to 26 times greater than emissions from hydroelectric plants. The Freshwater Institute, in an article published in Ambio suggests that emissions from hydroelectric plants could be a significant source of greenhouse gases. This conclusion does not apply to most hydroelectric projects for two reasons: First, the Freshwater Institute's studies concerned flooded peatlands and shallow reservoirs that are not typical of most hydro projects; and second, the Institute analyzed a hydro project with a ratio of flooded area to energy production that is 6 to 10 times higher than typical projects in Canada. 7 refs, 4 tabs

  18. A new methodology for royalties distribution of the Itaipu hydroelectric plant: The hydrographic basin as the unit of analysis.

    Science.gov (United States)

    Lorenzon, Alexandre Simões; Ribeiro, Carlos Antonio Alvares Soares; Dos Santos, Alexandre Rosa; de Castro, Nero Lemos Martins; Marcatti, Gustavo Eduardo; Domingues, Getulio Fonseca; Teixeira, Thaisa Ribeiro; Silva, Elias; Soares, Vicente Paulo; Menezes, Sady Júnior Martins da Costa de; de Almeida Telles, Lucas Arthur; Mota, Pedro Henrique Santos

    2018-04-11

    Over the past few years, many sectors such as energy generation, industry, domestic supply, and agriculture have encountered serious environmental problems due to the lack of rainfall. Thus, the purpose of this paper is to review the current methodology of royalties distribution from Itaipu hydroelectric plant. In the proposed approach, two criteria were considered to establish the division of Itaipu royalties: (1) the relative percentage of the water flow in the generation of electricity and, (2) the relative percentage of the drop in the height of water. 62 hydroelectric plants were evaluated in this study. In 52 plants the water flow was the factor that most contributed to the generation of electricity. In 2013, 346 municipalities benefited the Itaipu royalties. With the proposed methodology, 1,327 municipalities will receive the resource, what would increase the revenue of each of these municipalities by, on average, US$ 87,436.91 per year. The methodology presented herein proposes a reduction in the environmental disparity that now exists in Brazil, through improvement to Government instruments and environmental policies. The distribution of royalties throughout the watershed can provide additional resources to support payment programs for environmental services at the state and municipality levels. Copyright © 2018 Elsevier Ltd. All rights reserved.

  19. Fossil power plant automation

    International Nuclear Information System (INIS)

    Divakaruni, S.M.; Touchton, G.

    1991-01-01

    This paper elaborates on issues facing the utilities industry and seeks to address how new computer-based control and automation technologies resulting from recent microprocessor evolution, can improve fossil plant operations and maintenance. This in turn can assist utilities to emerge stronger from the challenges ahead. Many presentations at the first ISA/EPRI co-sponsored conference are targeted towards improving the use of computer and control systems in the fossil and nuclear power plants and we believe this to be the right forum to share our ideas

  20. Virtual power plant auctions

    International Nuclear Information System (INIS)

    Ausubel, Lawrence M.; Cramton, Peter

    2010-01-01

    Since their advent in 2001, virtual power plant (VPP) auctions have been implemented widely. In this paper, we describe the simultaneous ascending-clock auction format that has been used for virtually all VPP auctions to date, elaborating on other design choices that most VPP auctions have had in common as well as discussing a few aspects that have varied significantly among VPP auctions. We then evaluate the various objectives of regulators in requiring VPP auctions, concluding that the auctions have been effective devices for facilitating new entry into electricity markets and for developing wholesale power markets. (author)

  1. Virtual power plant auctions

    Energy Technology Data Exchange (ETDEWEB)

    Ausubel, Lawrence M.; Cramton, Peter [Department of Economics, University of Maryland, College Park, MD 20742 (United States)

    2010-12-15

    Since their advent in 2001, virtual power plant (VPP) auctions have been implemented widely. In this paper, we describe the simultaneous ascending-clock auction format that has been used for virtually all VPP auctions to date, elaborating on other design choices that most VPP auctions have had in common as well as discussing a few aspects that have varied significantly among VPP auctions. We then evaluate the various objectives of regulators in requiring VPP auctions, concluding that the auctions have been effective devices for facilitating new entry into electricity markets and for developing wholesale power markets. (author)

  2. Multidisciplinary studies on hydric, energetic and environmental resources, evaluating the hydroelectric plants energy surplus as alternative for hydrogen production; Estudos multidisciplinares na area de recursos hidricos, energeticos e ambientais, avaliando-se o uso de energia excedente de hidreletricas como alternativa para producao de hidrogenio

    Energy Technology Data Exchange (ETDEWEB)

    Mariotoni, Carlos Alberto; Naturesa, Jim Silva; Santos Junior, Joubert Rodrigues; Demanboro, Antonio Carlos [Universidade Estadual de Campinas (UNICAMP), SP (Brazil). Faculdade de Engenharia Civil. Grupo de Planejamento Energetico e Sistemas Eletricos]. E-mails: cam@fec.unicamp.br; jimnaturesa@yahoo.com; joubert.dos@terra.com.br; anto1810@fec.unicamp.br

    2006-07-01

    The researchers on energy, hydraulic and environmental subjects have been discussing the perspective and both the technical and economic viability of using the exceeding energy of hydroelectric power plants to produce hydrogen, taking into consideration the resources optimizations and the maximization of the economic gains. The researches and technicians of the Brazilian energy sector have considered, the increasing possibility of using of exceeding energy from hydroelectric power plants to produce hydrogen, mainly for the special case of the bi-national hydroelectric of Itaipu. Nevertheless it is important to present a discussion about the use and the production of hydrogen in Brazilian context considering, mainly, the consolidated experience of certain research centers and national laboratories. The paper also presents a discussions about the main technical characteristics, the electro electronic devices used and a brief discussion about the possibility of electric energy expansion, through the use of FACTS devices, for the southeast region of the country having the hydrogen as an important fuel. (author)

  3. Nuclear power plant

    International Nuclear Information System (INIS)

    Schabert, H.P.; Laurer, E.

    1976-01-01

    The invention concerns a quick-acting valve on the main-steam pipe of a nuclear power plant. The engineering design of the valve is to be improved. To the main valve disc, a piston-operated auxiliary valve disc is to be assigned closing a section of the area of the main valve disc. This way it is avoided that the drive of the main valve disc has to carry out different movements. 15 sub-claims. (UWI) [de

  4. Power plant emissions reduction

    Science.gov (United States)

    Anand, Ashok Kumar; Nagarjuna Reddy, Thirumala Reddy

    2015-10-20

    A system for improved emissions performance of a power plant generally includes an exhaust gas recirculation system having an exhaust gas compressor disposed downstream from the combustor, a condensation collection system at least partially disposed upstream from the exhaust gas compressor, and a mixing chamber in fluid communication with the exhaust gas compressor and the condensation collection system, where the mixing chamber is in fluid communication with the combustor.

  5. Power plant design model

    International Nuclear Information System (INIS)

    Hartsock, D.K.

    1988-01-01

    This paper reports on the Power Plant Design Model (PPDM) which is an interactive FORTRAN/2020 program with over 15,000 lines of code that allows a user to create an engineering model of a grass roots solid fuel-fired facility capable of generating steam for electrical power generation and/or sale. Capital, operating, and maintenance cost estimates of the modeled plant are also generated. The model's technical output contains complete material and energy balances of all major streams, parasitic power calculations, boiler operating data and a major equipment list. The economic output consists of a capital cost estimate for the plant in a spreadsheet format detailing the material, labor and indirect costs associated with each piece of equipment. The model was intended for use as a marketing tool to replace engineering feasibility studies which are needed to determine the viability of a project. The model provides preliminary economics at a fraction of time and manpower effort normally associated with this task

  6. Nuclear power plants in electric power system

    International Nuclear Information System (INIS)

    Leicman, J.; Vokurka, F.

    1985-01-01

    The paper analyzes the demands placed by the power system on operating qualities of nuclear power plants with regard to the prospective tasks of nuclear power in the Czechoslovak power system. The characteristics of the operation of Czechoslovak nuclear plants are given taking into account the frequency and voltage deviations of the network, operating and control properties of nuclear power plants with WWER-440 and WWER-1000 reactors considering the technical conditions of operation, the required operating schedule of a nuclear power plant unit. For comparison, the demands are summed up of foreign power systems as are the control properties of foreign nuclear power units in regulating output, regulating delivered electric power and in emergency states of the system. Recommendations for further research and development are drawn from the data. (author)

  7. Power plant operation and management in a deregulated market

    International Nuclear Information System (INIS)

    Carraretto, Cristian

    2006-01-01

    This paper analyzes the influence of electricity deregulation on the design, operation and management of the power plants owned by strategic and non-strategic producers. After a sensitivity analysis aimed at finding market conditions of profitable operation for thermal and hydroelectric power plants, a Nash-equilibrium market model is used to determine producers' optimum strategies, depending on their relative market power and overall production characteristics. Attention is then focused on the operation of single thermal power plants. Their short-term management plans and consequent effects on emission levels and residual life are described. The available reserve for primary and secondary control deriving from producers' market strategies is discussed. Some design options to improve combined cycles contribution to reserve service are finally described. The paper discusses these problems with a general approach, and uses many cases and examples derived from the current Italian scenario. (author)

  8. What share for hydroelectricity in France?

    International Nuclear Information System (INIS)

    Bongrand, Th.; Bouvier, E.; Francois, M.; Martin, J.M.; Tardieu, B.; Vogien, M.; Cruchon, Ph.; Miquel, J.; Gariel, A.; Levasseur, L.; Mallet, J.P.

    2004-01-01

    This document gathers 10 presentations (articles) given at the 2. meeting on hydroelectricity, held at Grenoble on May 2004. The papers present some examples of realizations in the domain of small-hydropower, the R and D in progress and some recent advances in hydraulic engineering, the safety and quality aspects, and the environmental impacts and sustainable development of hydroelectric power: 1 - examples of small hydropower plants in France and in progress at SOGREAH (T. Bongrand); 2 - the pico-power plants implemented on drinkable water networks (E. Bouvier); 3 - MINI-AQUA: the mini-hydro solution (M. Francois); 4 - Grenoble and the Alpine valley, pole of hydraulic and hydroelectric competences (J.M. Martin); 5 - history and R and D (B. Tardieu); 6 - advances in engineering for a forefront industry (M. Vogien); 7 - improvement of hydraulic safety (P. Cruchon); 8 - a ISO 14001 certification experience in the domain of hydroelectricity (A. Gariel); 9 - the Rhone river development, reserved flow rate and sustainable development (L. Levasseur); 10 - small hydropower: impact and integration (J.P. Mallet). (J.S.)

  9. Obrigheim nuclear power plant

    International Nuclear Information System (INIS)

    1976-05-01

    The gross output of the 345MWe pressurized water nuclear power station at Obrigheim, operation on base load, amounted to about 2.57TWh in 1974, the net power fed to the grid being about 2.44TWh. The core was used to its full capacity until 10 May 1974. Thereafter, the reactor was on stretch-out operation with steadily decreasing load until refuelled in August 1974. Plant availability in 1974 amounted to 92.1%. Of the 7.9% non-availability, 7.87% was attributable to the refuelling operation carried out from 16 August to 14 September and to the inspection, overhaul and repair work and the routine tests performed during this period. The plant was in good condition. Only two brief shutdowns occurred in 1974, the total outage time being 21/2 hours. From the beginning of trial operation in March 1969 to the end of 1974, the plant achieved an availability factor of 85.2%. The mean core burnup at the end of the fifth cycle was 19600 MWd/tonne U, with one fuel element that had been used for four cycles achieving a mean burnup of 39000 MWd/tonne U. The sipping test on the fuel elements revealed defective fuel-rods in a prototype plutonium fuel element, a high-efficiency uranium fuel element and a uranium fuel element. The quantities of radioactive substances released to the environment in 1974 were far below the officially permitted values. In july 1974, a reference preparation made up in the nuclear power station in October 1973 was discovered by outsiders on the Obrigheim municipality rubbish tip. The investigations revealed that this reference preparation had very probably been abstracted from the plant in October 1973 and arrived at the rubbish tip in a most irregular manner shortly before its discovery

  10. On nuclear power plant uprating

    International Nuclear Information System (INIS)

    Ho, S. Allen; Bailey, James V.; Maginnis, Stephen T.

    2004-01-01

    Power uprating for commercial nuclear power plants has become increasingly attractive because of pragmatic reasons. It provides quick return on investment and competitive financial benefits, while involving low risks regarding plant safety and public objection. This paper briefly discussed nuclear plant uprating guidelines, scope for design basis analysis and engineering evaluation, and presented the Salem nuclear power plant uprating study for illustration purposes. A cost and benefit evaluation of the Salem power uprating was also included. (author)

  11. Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    Analia Bonelli

    2012-01-01

    Full Text Available A description of the results for a Station Black-Out analysis for Atucha 2 Nuclear Power Plant is presented here. Calculations were performed with MELCOR 1.8.6 YV3165 Code. Atucha 2 is a pressurized heavy water reactor, cooled and moderated with heavy water, by two separate systems, presently under final construction in Argentina. The initiating event is loss of power, accompanied by the failure of four out of four diesel generators. All remaining plant safety systems are supposed to be available. It is assumed that during the Station Black-Out sequence the first pressurizer safety valve fails stuck open after 3 cycles of water release, respectively, 17 cycles in total. During the transient, the water in the fuel channels evaporates first while the moderator tank is still partially full. The moderator tank inventory acts as a temporary heat sink for the decay heat, which is evacuated through conduction and radiation heat transfer, delaying core degradation. This feature, together with the large volume of the steel filler pieces in the lower plenum and a high primary system volume to thermal power ratio, derives in a very slow transient in which RPV failure time is four to five times larger than that of other German PWRs.

  12. Power and dignity: the social consequences of hydro-electric development for the James Bay Cree

    Energy Technology Data Exchange (ETDEWEB)

    Niezen, R. [Harvard Univ., Boston, MA (United States)

    1993-11-01

    The social impact that large-scale hydro-electric development has on the Cree of James Bay following the construction of the La Grande Complex was discussed. Many environmental changes were brought about by dam construction. The project, which also involved the first settlement (the James Bay and Northern Quebec Agreement) directed at extinguishing aboriginal title to land and natural resources in Canada, resulted in several relocations of Cree communities. In addition to compensation, the Agreement included a formal procedure for environmental and social impact assessment for development projects. However, there was little commitment, as a matter of corporate or government policy, to monitoring any of the social impacts. This paper is a preliminary response to an appeal for attention to be focused on the social consequences of hydro-electric development for the Cree in James Bay. Data from social service files indicate that the rapid centralization of the James Bay Cree into structured communities led to social instability in the villages, reflected by high frequencies in suicide, neglect of children, vandalism and drug and alcohol abuse. The material presented here is expected to serve as a warning that in further developing the far North of Quebec the pace of social change in Cree society will have to be slowed down to avoid social destruction of the native communities. 15 refs., 2 tabs.

  13. Legal obstacles and incentives to the development of small scale hydroelectric power in Maryland

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maryland are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined with the aim of creating a more orderly understanding of the vagaries of the system, focusing on the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. In Maryland, by common law rule, title to all navigable waters and to the soil below the high-water mark of those waters is vested in the state as successor to the Lord Proprietary who had received it by grant from the Crown. Rights to non-navigable water, public trust doctrine, and eminent domain are also discussed. Direct and indirect regulations, continuing obligations, loan programs, and regional organizations are described in additional sections.

  14. Power and dignity: the social consequences of hydro-electric development for the James Bay Cree

    International Nuclear Information System (INIS)

    Niezen, R.

    1993-01-01

    The social impact that large-scale hydro-electric development has on the Cree of James Bay following the construction of the La Grande Complex was discussed. Many environmental changes were brought about by dam construction. The project, which also involved the first settlement (the James Bay and Northern Quebec Agreement) directed at extinguishing aboriginal title to land and natural resources in Canada, resulted in several relocations of Cree communities. In addition to compensation, the Agreement included a formal procedure for environmental and social impact assessment for development projects. However, there was little commitment, as a matter of corporate or government policy, to monitoring any of the social impacts. This paper is a preliminary response to an appeal for attention to be focused on the social consequences of hydro-electric development for the Cree in James Bay. Data from social service files indicate that the rapid centralization of the James Bay Cree into structured communities led to social instability in the villages, reflected by high frequencies in suicide, neglect of children, vandalism and drug and alcohol abuse. The material presented here is expected to serve as a warning that in further developing the far North of Quebec the pace of social change in Cree society will have to be slowed down to avoid social destruction of the native communities. 15 refs., 2 tabs

  15. Floating nuclear power plants

    International Nuclear Information System (INIS)

    Kindt, J.W.

    1983-01-01

    This article examines the legal regime for floating nuclear power plants (FNPs), in view of the absence of specific US legislation and the very limited references to artificial islands in the Law of the Sea Convention. The environmental impacts of FNPs are examined and changes in US regulation following the Three Mile Island accident and recent US court decisions are described. References in the Law of the Sea Convention relevant to FNPs are outlined and the current status of international law on the subject is analysed. (author)

  16. Demonstration tokamak power plant

    Energy Technology Data Exchange (ETDEWEB)

    Abdou, M.; Baker, C.; Brooks, J.; Ehst, D.; Mattas, R.; Smith, D.L.; DeFreece, D.; Morgan, G.D.; Trachsel, C.

    1983-01-01

    A conceptual design for a tokamak demonstration power plant (DEMO) was developed. A large part of the study focused on examining the key issues and identifying the R and D needs for: (1) current drive for steady-state operation, (2) impurity control and exhaust, (3) tritium breeding blanket, and (4) reactor configuration and maintenance. Impurity control and exhaust will not be covered in this paper but is discussed in another paper in these proceedings, entitled Key Issues of FED/INTOR Impurity Control System.

  17. Wind power plant system services

    DEFF Research Database (Denmark)

    Basit, Abdul; Altin, Müfit

    Traditionally, conventional power plants have the task to support the power system, by supplying power balancing services. These services are required by the power system operators in order to secure a safe and reliable operation of the power system. However, as in the future the wind power...... is going more and more to replace conventional power plants, the sources of conventional reserve available to the system will be reduced and fewer conventional plants will be available on-line to share the regulation burden. The reliable operation of highly wind power integrated power system might...... then beat risk unless the wind power plants (WPPs) are able to support and participate in power balancing services. The objective of this PhD project is to develop and analyse control strategies which can increase the WPPs capability to provide system services, such as active power balancing control...

  18. Nuclear power plants

    International Nuclear Information System (INIS)

    Ushijima, Susumu.

    1984-01-01

    Purpose: To enable to prevent the degradation in the quality of condensated water in a case where sea water leakage should occur in a steam condenser of a BWR type nuclear power plant. Constitution: Increase in the ion concentration in condensated water is detected by an ion concentration detector and the leaking factor of sea water is calculated in a leaking factor calculator. If the sea water leaking factor exceeds a predetermined value, a leak generation signal is sent from a judging device to a reactor power control device to reduce the reactor power. At ehe same tiem, the leak generation signal is also sent to a steam condenser selection and isolation device to interrupt the sea water pump of a specified steam condenser based on the signal from the ion concentration detector, as well as close the inlet and outlet valves while open vent and drain valves to thereby forcively discharge the sea water in the cooling water pipes. This can keep the condensate desalting device from ion breaking and prevent the degradation in the quality of the reactor water. (Horiuchi, T.)

  19. [Experience in organization of joint actions of expert divisions during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station].

    Science.gov (United States)

    Kolkutin, V V; Ivanov, P L; Fetisov, V A; Afanas'ev, S A; Dorozhkin, O A; Vognerubov, R N; Kuznetsov, T L

    2010-01-01

    The authors illustrate positive experience in organization and coordination of joint actions of expert divisions of different sectors during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station in August 2009. Special emphasis is laid on the participation of experts of quick-reaction teams formed by territorial forensic medical bureaus, mobile and supporting forces from the adjacent regions.

  20. Accident prevention in power plants

    International Nuclear Information System (INIS)

    Steyrer, H.

    Large thermal power plants are insured to a great extent at the Industrial Injuries Insurance Institute of Instrument and Electric Engineering. Approximately 4800 employees are registered. The accident frequency according to an evaluation over 12 months lies around 79.8 per year and 1000 employees in fossil-fired power plants, around 34.1 per year and 1000 employees in nuclear power plants, as in nuclear power plants coal handling and ash removal are excluded. Injuries due to radiation were not registered. The crucial points of accidents are mechanical injuries received on solid, sharp-edged and pointed objects (fossil-fired power plants 28.6%, nuclear power plants 41.5%), stumbling, twisting or slipping (fossil-fired power plants 21.8%, nuclear power plants 19.5%) and injuries due to moving machine parts (only nuclear power plants 12.2%). However, accidents due to burns or scalds obtain with 4.2% and less a lower portion than expected. The accident statistics can explain this fact in a way that the typical power plant accident does not exist. (orig./GL) [de

  1. Adaptation of thermal power plants

    NARCIS (Netherlands)

    Bogmans, Christian W.J.; Dijkema, Gerard P.J.; Vliet, van Michelle T.H.

    2017-01-01

    When does climate change information lead to adaptation? We analyze thermal power plant adaptation by means of investing in water-saving (cooling) technology to prevent a decrease in plant efficiency and load reduction. A comprehensive power plant investment model, forced with downscaled climate

  2. Considering on the use of thermal power plants in Brazil; Discorrendo sobre o uso das termeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Maria Thereza da Silva Lopes; Souza, Marina Correa de [Universidade Federal dos Vales do Jequitinhonha e Mucuri (UFVJM), Diamantina, MG (Brazil). Inst. de Ciencia e Tecnologia

    2015-07-01

    Today, the world depends on an abundant amount of energy. Hence, there is a need in creating new ways of obtaining energy to boost industrial production and thereby increase the wealth of a country. Therefore, industrial growth is strongly linked to way to get clean and cheap energy. In Brazil, preferentially uses the energy from the hydroelectric plants, but these may not always generate the energy required to supply all our needs. So, we can not deny that the thermal power plants have a respectable role in power generation, complementing the energy from the hydroelectric when they go through times of low production, as in periods of drought. (author)

  3. Feasibility determination of low-head hydroelectric power development at existing sites. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Polonsky, R.

    1979-01-01

    This report contains the feasibility study, economic analysis, and information relevant to reactivation of the dam in Bethelehem, NH. It outlines a plan of development which calls for sale of the power to a local utility for the first few years of the project and then predominately on-site use of the power in an innovative plan for controlled-environment agriculture. The economic analyses indicate that reactivation of the dam would be a successful venture based on the present market value of 4.5 cents/kWh. The success of the second phase in the dam's use rests on the increasing financial attractiveness of locally grown produce in a state that currently imports over 90% of its food and is experiencing the spiraling costs of food, energy, and inflation. The best-suited turbine package for the site is an Ossberger 750-kW unit which would provide 4,014,000 kWh per year with a plant factor of 61%. The total capital costs of the project are $827,935.

  4. Floristic and phytosociology in dense "terra firme" rainforest in the Belo Monte Hydroelectric Plant influence area, Pará, Brazil.

    Science.gov (United States)

    Lemos, D A N; Ferreira, B G A; Siqueira, J D P; Oliveira, M M; Ferreira, A M

    2015-08-01

    The objective of the present study was to characterise the floristic and phytosociological composition on a stretch of dense "Terra Firme" rainforest located in the Belo Monte hydroelectric plant area of influence, located in the state of Pará, Brazil. All trees with DAP >10 cm situated in 75 permanent plots of 1 ha were inventoried. 27,126 individuals trees (361 ind.ha-1), distributed in 59 botanical families, comprising 481 species were observed. The families with the largest number of species were Fabaceae (94), Araceae (65) and Arecaceae (43), comprising 43.7% of total species. The species Alexa grandiflora (4.41), Cenostigma tocantinum (2.50) and Bertholletia excelsa (2.28) showed the highest importance values (IV). The ten species with greater IV are concentrated (22%). The forest community has high species richness and can be classified as diverse age trees, heterogeneous and of medium conservation condition.

  5. [Analysis of the social and health impacts of large hydroelectric plants: lessons for a sustainable energy management].

    Science.gov (United States)

    de Queiroz, Adriana Renata Sathler; Motta-Veiga, Marcelo

    2012-06-01

    The main objective of this study was to analyze the social and health impacts resulting from the construction of the Tucuruí (Pará, Brazil) and James Bay (Quebec, Canada) Hydroelectric Plants. The comparative method study used in analysis of the literature review revealed lessons to be learned from the national and international experience in order to ensure sustainable management of future major energy projects in Brazil. In this study, a successive negative domino effect was observed in terms of social impacts on jobs, income, sanitation, and culture, all with associated health problems. These included stress, nutritional and psychosocial disturbances, cardiopathies, as well as respiratory and digestive problems. The actions seeking to mitigate the effects of these negative impacts were slow to be implemented. Moreover, even though three decades have elapsed, these actions proved inefficient to resolve all the health and socio-environmental problems caused.

  6. Nuclear power plant

    International Nuclear Information System (INIS)

    Schabert, H.P.

    1976-01-01

    A nuclear power plant is described which includes a steam generator supplied via an input inlet with feedwater heated by reactor coolant to generate steam, the steam being conducted to a steam engine having a high pressure stage to which the steam is supplied, and which exhausts the steam through a reheater to a low pressure stage. The reheater is a heat exchanger requiring a supply of hot fluid. To avoid the extra load that would be placed on the steam generator by using a portion of its steam output as such heating fluid, a portion of the water in the steam generator is removed and passed through the reheater, this water having received at least adequate heating in the steam generator to make the reheater effective, but not at the time of its removal being in a boiling condition

  7. Nuclear power plant

    International Nuclear Information System (INIS)

    Uruma, Hiroshi

    1998-01-01

    In the first embodiment of the present invention, elements less activated by neutrons are used as reactor core structural materials placed under high neutron irradiation. In the second embodiment of the present invention, materials less activated by neutrons when corrosive materials intrude to a reactor core are used as structural materials constituting portions where corrosion products are generated. In the third embodiment, chemical species comprising elements less activated by neutrons are used as chemical species to be added to reactor water with an aim of controlling water quality. A nuclear power plant causing less radioactivity can be provided by using structural materials comprising a group of specific elements hardly forming radioactivity by activation of neutrons or by controlling isotope ratios. (N.H.)

  8. Nuclear power plant exports

    International Nuclear Information System (INIS)

    Degot, D.

    1987-01-01

    Framatome export expertise is discussed. Framatome can accept different types of contracts - for the supply of nuclear steam supply systems or for nuclear islands (both of which can be produced solely by Framatome) or for complete plants. Cooperation with the local industry is possible -this can involve technology transfer. Examples of exports in the following countries are given; Belgium (where there is close cooperation between Framatome and two major companies), South Africa (where Framatome has been involved in the building of a two-992 MWe unit at Koeberg), South Korea (where Framatome is building two-900 MWe nuclear islands in cooperation with Korean industry, Knu 9 and Knu 10) and China (where Framatome is to build two-1000 MWe class pressurized water reactors at Daya Bay). As well as supplying the French domestic nuclear market Framatome is a major force in the future of nuclear power in the world. (UK)

  9. Wuergassen nuclear power plant

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The decision of the Federal Court of Administration concerns an application for immediate decommissioning of a nuclear power plant (Wuergassen reactor): The repeal of the permit granted. The decision dismisses the appeal for non-admission lodged by the plaintiffs against the ruling of the Higher Court of Administration (OVG) of North-Rhine Westphalia of December 19th 1988 (File no. 21 AK 8/88). As to the matter in dispute, the Federal Court of Administration confirms the opinion of the Higher Court of Administration. As to the headnotes, reference can be made to that decision. Federal Court of Administration, decision of April 5th 1989 - 7 B 47.89. Lower instance: OVG NW, Az.: 21 AK 8/88. (orig./RST) [de

  10. Project PAT (Pumps Working as Turbines)/IG (Induction Generators): a new concept for generation of electric power through micro scale hydroelectric power plants; Projeto BFT (Bombas Funcionado como Turbinas)/GI (Geradores de Inducao): um novo conceito para geracao de energia eletrica atraves de microcentrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Viana, Augusto Nelson Carvalho [Universidade Federal de Itajuba (UNIFEI), Itajuba, MG (Brazil). Inst. de Recursos Naturais. Programa de Pos-graduacao em Engenharia da Energia; Medeiros, Daniel de Macedo; Ricardo, Mateus [Universidade Federal de Itajuba (UNIFEI), Itajuba, MG (Brazil). Inst. de Recursos Naturais], Emails: augusto@unifei.edu.br, macedo@unifei.edu.br, mathidr@yahoo.com.br

    2006-07-01

    The present work has as objective to present the main bases of 'PAT/IG Project', accomplished in Boa Esperanca Farm (Delfim Moreira - MG), by an accord between Itajuba's Federal University and Mines and Energy Ministry. In a moment that the look for sustainable development is the law in Brazil, low costs and environmental impact alternatives must be prioritized. By this way, the PAT/IG Project continuous the Viana's (1987) works, that developed all Brazilian theoretical bases for using Pumps Working as Turbine (PAT). Besides that, the application of induction motors operating as induction generators will be evaluated, as the velocity control system of the PAT/IG group will be developed. The existing Boa Esperanca Farm's micro power plant will be rebuild ed, to receive a new generating group formed for a PAT and a IG, that will be used as natural sized test workbench of Itajuba's Federal University. At the ending of the project, there will be enough subsidies to prove, in practice, the feasibility presented in laboratorial tests by PAT/IG groups as conventional turbines replacer in micro powerplants. (author)

  11. The long term plan for the integration of nuclear power plants into the Turkish Electrical Power System

    International Nuclear Information System (INIS)

    Kutukcuoglu, A.

    1974-03-01

    The report covers in detail the study of the expansion of the Turkish Electric Power System for the period 1980-1987. Load forecast is done by sectors and regions and inter-regions power balances gave the basis for the high voltage network configurations. Expansion alternatives are defined giving priority to hydroelectric projects, to local resources and nuclear power plants concurrently with conventional plants (lignite and oil). Several reactor strategies are analysed with LWR, HWR, FBR and HTGR power plants. Present worth value method is used for comparison of alternatives and sensitivity analysis is done for those ranked in the first places. Load flow, transient stability and frequency deviation studies of the power system are studied carefully by means of A.C. calculator and digital computer codes in order to see the influence of the introduction of large-sized power plants (600-750MW(e)) and their location in the power system. A 600MW(e) nuclear plant in 1983 and a second one of 750MW(e) in 1987 should, it is found, be commissioned into the system. The economic optimization was done with two computer programmes developed by KFA (Juelich): IACO for fuelling nuclear plant and RESTRAPO for power system with high hydroelectric component. The report is bound in three volumes: Volume I: Summary and Conclusions; Volume II: System Planning; Volume III: Electrical Survey

  12. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  13. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  14. Optimization of the Energy Output of Osmotic Power Plants

    Directory of Open Access Journals (Sweden)

    Florian Dinger

    2013-01-01

    Full Text Available On the way to a completely renewable energy supply, additional alternatives to hydroelectric, wind, and solar power have to be investigated. Osmotic power is such an alternative with a theoretical global annual potential of up to 14400 TWh (70% of the global electricity consumption of 2008 per year. It utilizes the phenomenon that upon the mixing of fresh water and oceanic salt water (e.g., at a river mouth, around 2.88 MJ of energy per 1 m3 of fresh water is released. Here, we describe a new approach to derive operational parameter settings for osmotic power plants using a pressure exchanger for optimal performance, either with respect to maximum generated power or maximum extracted energy. Up to now, only power optimization is discussed in the literature, but when considering the fresh water supply as a limiting factor, the energy optimization appears as the challenging task.

  15. Operating experience from Swedish nuclear power plants 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The total production of electricity from Swedish nuclear power plants was 65.6 TWh during 2002, which is a decrease compared to 2001. The energy capability factor for the 11 Swedish reactors averaged 80.8%. The PWRs at Ringhals averaged 87.6%, while the BWRs, not counting Oskarshamn 1, reached 89.2%. No events, which in accordance to conventions should be reported to IAEA, have occurred during 2002. Operational statistics are presented for each Swedish reactor. The hydroelectric power was 66 TWh, 16% lower than 2000. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 10.9 TWh. The electricity generation totalled 143 TWh, considerably less than the record high 2001 figure of 158.7 TWh. The preliminary figures for export were 14.8 TWh and and for import 20.1 TWh.

  16. Reference commercial fusion power plants

    Energy Technology Data Exchange (ETDEWEB)

    Young, J.R.; Gore, B.F.

    1976-09-01

    Currently available conceptual designs for commercial fusion power plants are for first generation plants using deuterium-tritium (D-T) fuel, and are all functionally similar. This similarity has been used as a basis for defining an envelope of D-T fusion power plant characteristics which encompasses the characteristics of the available designs. A description of this envelope, including general process descriptions, proposed materials uses and a tabulation of numerical ranges of plant parameters is presented in this document.

  17. Are atomic power plants saver than nuclear power plants

    International Nuclear Information System (INIS)

    Roeglin, H.C.

    1977-01-01

    It is rather impossible to establish nuclear power plants against the resistance of the population. To prevail over this resistance, a clarification of the citizens-initiatives motives which led to it will be necessary. This is to say: It is quite impossible for our population to understand what really heappens in nuclear power plants. They cannot identify themselves with nuclear power plants and thus feel very uncomfortable. As the total population feels the same way it is prepared for solidarity with the citizens-initiatives even if they believe in the necessity of nuclear power plants. Only an information-policy making transparent the social-psychological reasons of the population for being against nuclear power plants could be able to prevail over the resistance. More information about the technical procedures is not sufficient at all. (orig.) [de

  18. The year 2000 power plant

    International Nuclear Information System (INIS)

    Roman, H.T.

    1989-01-01

    Every utility seeks extended service life from its existing power plants before building new ones. It is not easy to justify a new power plant. The licensing and cost of new plants have become uncertain. In response to these conditions, electric utilities are undertaking plant life-extension studies and, in some cases, reconditioning/upgrading old power plants to significantly increase useful service life. Other technologies like robotics and artificial intelligence/expert systems are also being developed to reduce operating and maintenance (O and M) expenses, to remove workers from potentially hazardous environments, and to reduce plant downtime. Together, these steps represent an interim solution, perhaps providing some relief for the next few decades. However, there are serious physical and economic limits to retrofitting new technology into existing power plants. Some old plants will simply be beyond their useful life and require retirement. In nuclear plants, for instance, retrofit may raise important and time-consuming licensing/safety issues. Based on their robotics and artificial intelligence experience, the authors of this article speculate bout the design of the year 2000 power plant - a power plant they feel will naturally incorporate liberal amounts of robotic and artificial intelligence technologies

  19. Images of nuclear power plants

    International Nuclear Information System (INIS)

    Hashiguchi, Katsuhisa; Misumi, Jyuji; Yamada, Akira; Sakurai, Yukihiro; Seki, Fumiyasu; Shinohara, Hirofumi; Misumi, Emiko; Kinjou, Akira; Kubo, Tomonori.

    1995-01-01

    This study was conducted to check and see, using Hayashi's quantification method III, whether or not the respondents differed in their images of a nuclear power plant, depending on their demographic variables particularly occupations. In our simple tabulation, we compared subject groups of nuclear power plant employees with general citizens, nurses and students in terms of their images of a nuclear power plant. The results were that while the nuclear power plant employees were high in their evaluations of facts about a nuclear power plant and in their positive images of a nuclear power plant, general citizens, nurses and students were overwhelmingly high in their negative images of a nuclear power plant. In our analysis on category score by means of the quantification method III, the first correlation axis was the dimension of 'safety'-'danger' and the second correlation axis was the dimension of 'subjectivity'-'objectivity', and that the first quadrant was the area of 'safety-subjectivity', the second quadrant was the area of 'danger-subjectivity', the third quadrant as the area of 'danger-objectivity', and the forth quadrant was the area of 'safety-objectivity'. In our analysis of sample score, 16 occupation groups was compared. As a result, it was found that the 16 occupation groups' images of a nuclear power plant were, in the order of favorableness, (1) section chiefs in charge, maintenance subsection chiefs, maintenance foremen, (2) field leaders from subcontractors, (3) maintenance section members, operation section members, (4) employees of those subcontractors, (5) general citizens, nurses and students. On the 'safety-danger' dimension, nuclear power plant workers on the one hand and general citizens, nurses and students on the other were clearly divided in terms of their images of a nuclear power plant. Nuclear power plant workers were concentrated in the area of 'safety' and general citizens, nurses and students in the area of 'danger'. (J.P.N.)

  20. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Science.gov (United States)

    2013-05-16

    ... Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of..., Lakeport Hydroelectric Associates and Lakeport Hydroelectric Corporation (transferors) and Lakeport Hydroelectric One, LLC (transferee) filed an application for the transfer of license for the Lakeport Project...

  1. Owners of nuclear power plants

    International Nuclear Information System (INIS)

    Wood, R.S.

    1991-07-01

    This report indicates percentage ownership of commercial nuclear power plants by utility companies. The report includes all plants operating, under construction, docketed for NRC safety and environmental reviews, or under NRC antitrust review, but does not include those plants announced but not yet under review or those plants formally cancelled. Part 1 of the report lists plants alphabetically with their associated applicants or licensees and percentage ownership. Part 2 lists applicants or licensees alphabetically with their associated plants and percentage ownership. Part 1 also indicates which plants have received operating licenses (OLS)

  2. AND THERMAL POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Alduhov Oleg Aleksandrovich

    2012-10-01

    Full Text Available Investigation of the atmospheric dispersion as part of the process of selection of sites to accommodate nuclear and thermal power plants is performed to identify concentration fields of emissions and to assess the anthropogenic impact produced on the landscape components and human beings. Scattering properties of the atmospheric boundary layer are mainly determined by the turbulence intensity and the wind field. In its turn, the turbulence intensity is associated with the thermal stratification of the boundary layer. Therefore, research of the atmospheric dispersion is reduced to the study of temperature and wind patterns of the boundary layer. Statistical processing and analysis of the upper-air data involves the input of the data collected by upper-air stations. Until recently, the upper-air data covering the standard period between 1961 and 1970 were applied for these purposes, although these data cannot assure sufficient reliability of assessments in terms of the properties of the atmospheric dispersion. However, recent scientific and technological developments make it possible to substantially increase the data coverage by adding the upper-air data collected within the period between 1964 and 2010. The article has a brief overview of BL_PROGS, a specialized software package designated for the processing of the above data. The software package analyzes the principal properties of the atmospheric dispersion. The use of the proposed software package requires preliminary development of a database that has the information collected by an upper-air station. The software package is noteworthy for the absence of any substantial limitations imposed onto the amount of the input data that may go up in proportion to the amount of the upper-air data collected by upper-air stations.

  3. Simulating solar power plant variability :

    Energy Technology Data Exchange (ETDEWEB)

    Lave, Matthew Samuel; Ellis, Abraham; Stein, Joshua.

    2013-06-01

    It is important to be able to accurately simulate the variability of solar PV power plants for grid integration studies. We aim to inform integration studies of the ease of implementation and application-specific accuracy of current PV power plant output simulation methods. This report reviews methods for producing simulated high-resolution (sub-hour or even sub-minute) PV power plant output profiles for variability studies and describes their implementation. Two steps are involved in the simulations: estimation of average irradiance over the footprint of a PV plant and conversion of average irradiance to plant power output. Six models are described for simulating plant-average irradiance based on inputs of ground-measured irradiance, satellite-derived irradiance, or proxy plant measurements. The steps for converting plant-average irradiance to plant power output are detailed to understand the contributions to plant variability. A forthcoming report will quantify the accuracy of each method using application-specific validation metrics.

  4. Automation and supervision systems for hydroelectric plants and at stations; Automazione e supervisione di centrali e stazioni elettriche AT

    Energy Technology Data Exchange (ETDEWEB)

    Signoretti, R. [Edison, Ingegneria, Milan (Italy)

    2001-01-01

    In the report the design criteria used by Italian electric utility in the field of local and remote control as regards its hydroelectric plants and high voltage distribution substations are illustrated. For this kind of plants distributed control systems have been employed in the last five years. In the article the management and design choices adopted are pointed out and possible criteria to be employed in future are offered. A description of what carried out as regards the remote control centers and dispatcher of the electrical grid and communication carriers with a reference to their possible changes is also given. [Italian] Vengono illustrati i criteri realizzativi adottati nel campo del controllo da un'utility in fase di ammodernamento e seguente teleconduzione delle proprie centrali idroelettriche e stazioni elettriche AT di smistamento e distribuzione. Sono descritte le scelte progettuali e gestionali che hanno guidato l'ammodernamento impianti negli anni '90; periodo in cui e' avvenuto il passaggio al controllo a microprocessore, con l'adozione di sistemi di controllo distribuito. Vengono descritti i criteri fissati per tale tipologia di impianti al fine di garantire la loro conduzione in telecontrollo adottando un elevato livello di sicurezza operativa e garantendo la salvaguardia del macchinario e di parti di impianto. Vengono indicate infine le possibili linee di sviluppo tecnologiche e gestionali.

  5. Spatial Distribution of Fragmentation by Diversion-Typed Hydroelectric Plant Exploitation in East Baoxing Catchment from 1999 to 2013

    Directory of Open Access Journals (Sweden)

    Yong Huang

    2015-03-01

    Full Text Available In the Southwest Mountain areas, successive hydroelectric plant exploitation by humans on Baoxing River can exert a significant impact on regional landscape composition and structure. Taking East Baoxing River Catchment as the study area, the authors developed a method combining Moving Window based Calculation and Spatial Correlation Analysis to analyze the relationship between fragmentation and related spatial factors at a local scale, aiming to examine the spatial distribution rule of the landscape fragmentation and provide scientific support for the conservation of landscape ecology in the study area. From the perspective of the whole study area, although there is no clear relationship between the selected factors and the Change of DIVISION (CODIV, the comparison of R values in the latter interval (2006–2013 with those in the former interval (1999–2006 proves that the human activities of plant building have led to the increase in the DIVISION value. At the local scale, results show that a high positive relationship exists between slope and CODIV (R = 0.857, p-value = 0.05, while the relationship between river distance and CODIV is highly negative (R = −0.837, p-value = 0.01. A medium strong negative relationship lies between elevation and CODIV, while there is almost no linear relationship between distance from Qiaoqi reservoir and CODIV.

  6. Tidal power plant may develop into large-scale industry

    International Nuclear Information System (INIS)

    2001-01-01

    Hammerfest was the first city in Norway with hydroelectric power production and the first city in Northern Europe to have electric street lights. Recently, technologists within the city's electricity supply industry have suggested that Hammerfest should pioneer the field of tidal energy. The idea is to create a new Norwegian large-scale industry. The technology is being developed by the company Hammerfest Stroem. A complete plant is planned to be installed in Kvalsundet. It will include turbine, generator, converters, transmission to land and delivery to the network. Once fully developed, in 2004, the plant will be sold. The company expects to install similar plants elsewhere in Norway and abroad. It is calculated that for a tidewater current of 2.5 m/s, the worldwide potential is about 450 TWh

  7. Next Generation Geothermal Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Brugman, John; Hattar, Mai; Nichols, Kenneth; Esaki, Yuri

    1995-09-01

    A number of current and prospective power plant concepts were investigated to evaluate their potential to serve as the basis of the next generation geothermal power plant (NGGPP). The NGGPP has been envisaged as a power plant that would be more cost competitive (than current geothermal power plants) with fossil fuel power plants, would efficiently use resources and mitigate the risk of reservoir under-performance, and minimize or eliminate emission of pollutants and consumption of surface and ground water. Power plant concepts were analyzed using resource characteristics at ten different geothermal sites located in the western United States. Concepts were developed into viable power plant processes, capital costs were estimated and levelized busbar costs determined. Thus, the study results should be considered as useful indicators of the commercial viability of the various power plants concepts that were investigated. Broadly, the different power plant concepts that were analyzed in this study fall into the following categories: commercial binary and flash plants, advanced binary plants, advanced flash plants, flash/binary hybrid plants, and fossil/geothed hybrid plants. Commercial binary plants were evaluated using commercial isobutane as a working fluid; both air-cooling and water-cooling were considered. Advanced binary concepts included cycles using synchronous turbine-generators, cycles with metastable expansion, and cycles utilizing mixtures as working fluids. Dual flash steam plants were used as the model for the commercial flash cycle. The following advanced flash concepts were examined: dual flash with rotary separator turbine, dual flash with steam reheater, dual flash with hot water turbine, and subatmospheric flash. Both dual flash and binary cycles were combined with other cycles to develop a number of hybrid cycles: dual flash binary bottoming cycle, dual flash backpressure turbine binary cycle, dual flash gas turbine cycle, and binary gas turbine

  8. Hydro turbine governor’s power control of hydroelectric unit with sloping ceiling tailrace tunnel

    Science.gov (United States)

    Fu, Liang; Wu, Changli; Tang, Weiping

    2018-02-01

    The primary frequency regulation and load regulation transient process when the hydro turbine governor is under the power mode of hydropower unit with sloping ceiling tailrace are analysed by field test and numerical simulation in this paper. A simulation method based on “three-zone model” to simulate small fluctuation transient process of the sloping ceiling tailrace is proposed. The simulation model of hydraulic turbine governor power mode is established by governor’s PLC program identification and parameter measurement, and the simulation model is verified by the test. The slow-fast-slow “three-stage regulation” method which can improve the dynamic quality of hydro turbine governor power mode is proposed. The power regulation strategy and parameters are optimized by numerical simulation, the performance of primary frequency regulation and load regulation transient process when the hydro turbine governor is under power mode are improved significantly.

  9. Automation technology in power plants

    International Nuclear Information System (INIS)

    Essen, E.R.

    1995-01-01

    In this article a summery of the current architecture of modern process control systems in power plants and future trends have been explained. The further development of process control systems for power plants is influenced both by the developments in component and software technologies as well as the increased requirements of the power plants. The convenient and low cost configuration facilities of new process control systems have now reached a significance which makes it easy for customers to decide to purchase. (A.B.)

  10. New data on species of Demidospermus (Dactylogyridae: Monogenea) parasitizing fishes from the reservoir of the Itaipu Hydroelectric Power Station, Paraná State, Brazil, with new synonymies.

    Science.gov (United States)

    Cohen, Simone C; Kohn, Anna

    2008-01-01

    Eight known species of Demidospermus (Dactylogyridae, Monogenea) were collected from siluriform fishes from reservoir of the Itaipu Hydroelectric Power Station, Paraná, Brazil. Four of them are recorded for the first time in Brazil, enlarging their geographical distribution: Demidospermus armostus, Demidospermus anus, Demidospermus bidiverticulatum and Demidospermus valenciennesi. Demidospermus labrosi is synonymized with Demidospermus cornicinus and Demidospermus mandi with Demidospermus leptosynophallus and reported from two new hosts. Demidospermus paravalenciennesi and Demidospermus uncusvalidus were also collected.

  11. The effects of run-of-river hydroelectric power schemes on invertebrate community composition in temperate streams and rivers.

    Science.gov (United States)

    Bilotta, Gary S; Burnside, Niall G; Turley, Matthew D; Gray, Jeremy C; Orr, Harriet G

    2017-01-01

    Run-of-river (ROR) hydroelectric power (HEP) schemes are often presumed to be less ecologically damaging than large-scale storage HEP schemes. However, there is currently limited scientific evidence on their ecological impact. The aim of this article is to investigate the effects of ROR HEP schemes on communities of invertebrates in temperate streams and rivers, using a multi-site Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 22 systematically-selected ROR HEP schemes and 22 systematically-selected paired control sites. Five widely-used family-level invertebrate metrics (richness, evenness, LIFE, E-PSI, WHPT) were analysed using a linear mixed effects model. The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the evenness of the invertebrate community. However, no statistically significant effects were detected on the four other metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future invertebrate community impact studies.

  12. Owners of nuclear power plants

    International Nuclear Information System (INIS)

    Wood, R.S.

    1979-12-01

    The following list indicates percentage ownership of commercial nuclear power plants by utility companies as of December 1, 1979. The list includes all plants licensed to operate, under construction, docketed for NRC safety and envionmental reviews, or under NRC antitrust review. It does not include those plants announced but not yet under review or those plants formally cancelled. In many cases, ownership may be in the process of changing as a result of antitrust license conditions and hearings, altered financial conditions, changed power needs, and other reasons. However, this list reflects only those ownership percentages of which the NRC has been formally notified

  13. Space nuclear reactor power plants

    International Nuclear Information System (INIS)

    Buden, D.; Ranken, W.A.; Koenig, D.R.

    1980-01-01

    Requirements for electrical and propulsion power for space are expected to increase dramatically in the 1980s. Nuclear power is probably the only source for some deep space missions and a major competitor for many orbital missions, especially those at geosynchronous orbit. Because of the potential requirements, a technology program on space nuclear power plant components has been initiated by the Department of Energy. The missions that are foreseen, the current power plant concept, the technology program plan, and early key results are described

  14. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  15. Elecnuc. Nuclear power plants worldwide

    International Nuclear Information System (INIS)

    1998-01-01

    This small folder presents a digest of some useful information concerning the nuclear power plants worldwide and the situation of nuclear industry at the end of 1997: power production of nuclear origin, distribution of reactor types, number of installed units, evolution and prediction of reactor orders, connections to the grid and decommissioning, worldwide development of nuclear power, evolution of power production of nuclear origin, the installed power per reactor type, market shares and exports of the main nuclear engineering companies, power plants constructions and orders situation, evolution of reactors performances during the last 10 years, know-how and development of nuclear safety, the remarkable facts of 1997, the future of nuclear power and the energy policy trends. (J.S.)

  16. Robotics for nuclear power plants

    International Nuclear Information System (INIS)

    Shiraiwa, Takanori; Watanabe, Atsuo; Miyasawa, Tatsuo

    1984-01-01

    Demand for robots in nuclear power plants is increasing of late in order to reduce workers' exposure to radiations. Especially, owing to the progress of microelectronics and robotics, earnest desire is growing for the advent of intellecturized robots that perform indeterminate and complicated security work. Herein represented are the robots recently developed for nuclear power plants and the review of the present status of robotics. (author)

  17. Madeira river hydroelectric power plants: the planning for attendance of electric power demand, and the rush in studies and the socio environmental consequences; UHE's do Madeira: o planejamento para atendimento da demanda eletrica, celeridade nos estudos e as consequencias socio-ambientais

    Energy Technology Data Exchange (ETDEWEB)

    Moret, Artur de Souza; Ferreira, Iremar Antonio [Universidade Federal de Rondonia (UNIR), Porto Velho, RO (Brazil). Pos Graduacao em Desenvolvimento Regional e Meio Ambiente

    2008-07-01

    The process of demand detection in the Brazil planing is rigorous and competent, and is capable to detail the demand scenarios to be attended. However, in the planning there is another important phase which is to indicate the ways to go through the technologies, methodologies and actions, based on the interventions on the offer and demand and in the increasing of the power generation, and the energy efficiency; it is highlighted that for a competent planning: the technologies and the input must be all the available and dominated, independently of the dimension and enclosure.

  18. Modeling of Wind Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Spacil, D.; Santarius, P. [VSB - Technical University of Ostrava, Department of Electrical Measurement, FEECS, 17. listopadu 15, 708 33 Ostrava- Poruba (Czech Republic); Dobrucky, B. [University of Zilina, Department of Mechatronics and Electronics, FEE, Univerzitna 1, 010 26 Zilina (Slovakia)

    2006-07-01

    The electrical power produced by the wind power plant has increased in the last years in the world and probably will increase further in the future. Therefore, wind power plants have a significant influence on the power production. In this article the connection of the wind turbine to a grid is described in order to determine the impact of the existing wind turbines as well as planned wind turbines on the grid and ensure the proper functioning of the wind turbine. The purpose of the presented work is to find an analytical generator model for the simulation of the wind power plant and determine the influence on the grid by programming with Matlab/Simulink.

  19. The potential for price co-operation in a hydroelectric power market with temporary bottlenecks

    International Nuclear Information System (INIS)

    Stuhaug, Gro Merete

    2003-01-01

    The report discusses whether there is a larger potential for coordinated price stipulation in a hydropower market that periodically has limitations in the transmission capacity. Such limitations in the transmission capacities transform an integrated market into lesser market segments and this will be reflected in price differences between the segments. The total production in a power market with hydropower producers is dependent on the afflux. Hydropower producers with storage capacities have a large flexibility with respect to power production because the water in a water reservoir may be stored until the production period. Depending on the theoretical model in use the discount factor for coordinated price stipulation will be lower in a hydropower market with periodical limitations in the transmission capacities than in an integrated power market with optimal production adaptation

  20. Hydroelectric energy

    CERN Document Server

    Jennings, Terry Catasús

    2016-01-01

    The movement of a rushing river is a valuable energy source. Hydroelectric Energy shows how engineers build and operate dams, turbines, and generators to turn this movement into electricity. Easy-to-read text, vivid images, and helpful back matter give readers a clear look at this subject. Features include a table of contents, infographics, a glossary, additional resources, and an index. Aligned to Common Core Standards and correlated to state standards. Core Library is an imprint of Abdo Publishing, a division of ABDO.

  1. [Malaria and hematological aspects among residents to be impacted by reservoirs for the Santo Antônio and Jirau Hydroelectric Power Stations, Rondônia State, Brazil].

    Science.gov (United States)

    Katsuragawa, Tony Hiroshi; Cunha, Roberto Penna de Almeida; de Souza, Daniele Cristina Apoluceno; Gil, Luiz Herman Soares; Cruz, Rafael Bastos; Silva, Alexandre de Almeida E; Tada, Mauro Shugiro; da Silva, Luiz Hildebrando Pereira

    2009-07-01

    In Rondônia State, Brazil, two new hydroelectric plants, Santo Antônio and Jirau, are scheduled for construction on the Madeira River, upriver from the State capital, Porto Velho. The current study analyzes malaria prevalence before the construction and provides information on the possible impacts of malaria burden related to the influx of thousands of persons attracted by direct and indirect employment opportunities. According to the findings, malaria is present throughout the region, with varying prevalence rates. The existence of potential asymptomatic malaria carriers among the local population may be epidemiologically relevant and should be considered in the malaria control programs organized by public authorities and companies responsible for building the power plants, aimed at early diagnosis and treatment, vector control, water supply, and infrastructure in the urban areas.

  2. Potential Hydroelectric Power Upriver Dam: City of Spokane Department of Utilities Water Division

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The technical, economic, environmental and institutional feasibility of increasing the power generation capacity of the City of Spokane's Upriver Dam Complex by installing additional generating facilities and/or modifying existing facilities were studied. It is proposed that the existing powerhouse be uprated from 3.9 to 4.5 MW and that a new powerhouse be constructed with two 4.5 MW turbines to provide an annual additional energy production of 62.3 million kWh. No adverse environmental or safety effects are foreseen, the socio-institutional impacts will be beneficial, there is a market for the power produced, and the benefit/cost ratio is advantageous. (LCL)

  3. Partner of nuclear power plants

    International Nuclear Information System (INIS)

    Gribi, M.; Lauer, F.; Pauli, W.; Ruzek, W.

    1992-01-01

    Sulzer, the Swiss technology group, is a supplier of components and systems for nuclear power plants. Important parts of Swiss nuclear power stations, such as containments, reactor pressure vessels, primary pipings, are made in Winterthur. Sulzer Thermtec AG and some divisions of Sulzer Innotec focus their activities on servicing and backfitting nuclear power plants. The European market enjoys priority. New types of valves or systems are developed as economic solutions meeting more stringent criteria imposed by public authorities or arising from operating conditions. (orig.) [de

  4. Organizing nuclear power plant operation

    International Nuclear Information System (INIS)

    Adams, H.W.; Rekittke, K.

    1987-01-01

    With the preliminary culmination in the convoy plants of the high standard of engineered safeguards in German nuclear power plants developed over the past twenty years, the interest of operators has now increasingly turned to problems which had not been in the focus of attention before. One of these problems is the organization of nuclear power plant operation. In order to enlarge the basis of knowledge, which is documented also in the rules published by the Kerntechnischer Ausschuss (Nuclear Technology Committee), the German Federal Minister of the Interior has commissioned a study of the organizational structures of nuclear power plants. The findings of that study are covered in the article. Two representative nuclear power plants in the Federal Republic of Germany were selected for the study, one of them a single-unit plant run by an independent operating company in the form of a private company under German law (GmbH), the other a dual-unit plant operated as a dependent unit of a utility. The two enterprises have different structures of organization. (orig.) [de

  5. Dispatchable Solar Power Plant Project

    Energy Technology Data Exchange (ETDEWEB)

    Price, Henry [Solar Dynamics LLC, Broomfield, CO (United States)

    2018-01-31

    As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines

  6. ALARA at nuclear power plants

    International Nuclear Information System (INIS)

    Baum, J.W.

    1991-01-01

    Implementation of the ALARA principle at nuclear power plants presents a continuing challenge for health physicists at utility corporate and plant levels, for plant designers, and for regulatory agencies. The relatively large collective doses at some plants are being addressed through a variety of dose reduction techniques. Initiatives by the ICRP, NCRP, NRC, INPO, EPRI, and BNL ALARA Center have all contributed to a heightened interest and emphasis on dose reduction. The NCRP has formed Scientific Committee 46-9 which is developing a report on ALARA at Nuclear Power Plants. It is planned that this report will include material on historical aspects, management, valuation of dose reduction ($/person-Sv), quantitative and qualitative aspects of optimization, design, operational considerations, and training. The status of this work is summarized in this report

  7. A nuclear power plant for Lima city. Is it a real alternative?

    International Nuclear Information System (INIS)

    Romani A, J.

    1992-01-01

    At the present, Peru has an installed electricity capacity of 4112 MW from which the 80% comes from hydroelectric sources and other 20% from thermal sources. Lima city concentrates the larger industrial activities and uses 95% of the hydro-electric supply the 5% comes from thermal origin. This situation provokes an energetic vulnerability to Lima, a city with more them 10 million of inhabitants, because climatic changes and the electric towers destruction. In the 1989-1992 period lack of energy meant economic losses for about US$ 2 100 000. To solve this problem the government is building a 300 MW thermal station. This alternative means a low investment for Kw installed but high production costs. Additionally the installation of the plant in Lima will increase the environmental contamination due to emission of about 20000 TM/year of SOx and 7500 TM/year of NOx. The research study recommends as a solution the diversification of energy sources, avoiding dependence of the hydro-electrical ones. In the same form it suggests that the next 300 MW power station to be installed for about 1998 would be a nuclear power plant but not thermal one. It also makes a revision of the new designs for nuclear power plants called safe inherently which design and construction philosophy avoid the possibility of accidents like Chernobyl. (author). 15 refs., 5 tabs., 13 figs

  8. The Effects of Run-of-River Hydroelectric Power Schemes on Fish Community Composition in Temperate Streams and Rivers.

    Directory of Open Access Journals (Sweden)

    Gary S Bilotta

    Full Text Available The potential environmental impacts of large-scale storage hydroelectric power (HEP schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon-Salmo salar, number of >1 year old Atlantic salmon, number of brown trout-Salmo trutta, and number of >1 year old brown trout. The analyses showed that there was a statistically significant effect (p<0.05 of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies.

  9. The Effects of Run-of-River Hydroelectric Power Schemes on Fish Community Composition in Temperate Streams and Rivers.

    Science.gov (United States)

    Bilotta, Gary S; Burnside, Niall G; Gray, Jeremy C; Orr, Harriet G

    2016-01-01

    The potential environmental impacts of large-scale storage hydroelectric power (HEP) schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR) schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon-Salmo salar, number of >1 year old Atlantic salmon, number of brown trout-Salmo trutta, and number of >1 year old brown trout). The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies.

  10. Financing Solar Thermal Power Plants

    International Nuclear Information System (INIS)

    Price, Henry W.; Kistner, Rainer

    1999-01-01

    The commercialization of concentrating solar power technology took a major step forward in the mid 1980s and early 1990s with the development of the SEGS plants in California. Over the years they have proven that parabolic trough power technologies are the most cost-effective approach for commercial scale solar power generation in the sunbelt countries of the world. However, the question must be asked why no additional solar power plants have been build following the bankruptcy of the developer of the SEGS projects, LUZ International Limited. Although many believe the SEGS projects were a success as a result of parabolic trough technology they employ, in truth, the SEGS projects were developed simply because they represented an attractive opportunity for investors. Simply stated, no additional projects have been developed because no one has been able to put together a similarly attractive financial package to potential investors. More than $1.2 billion in private capital was raised in debt and equity financing for the nine SEGS plants. Investors and bankers who make these investments are the real clients for solar power technologies. They are not interested in annual solar to electric efficiencies, but in risk, return on investments, and coverage ratios. This paper will take a look at solar power projects from the financier's perspective. The challenge in moving forward is to attract private investors, commercial lenders, and international development agencies and to find innovative solutions to the difficult issues that investment in the global power market poses for solar power technologies

  11. Financing solar thermal power plants

    International Nuclear Information System (INIS)

    Kistner, R.; Price, H.

    1999-01-01

    The commercialization of concentrating solar power technology took a major step forward in the mid 1980s and early 1990s with the development of the SEGS plants in California. Over the years they have proven that parabolic trough power technologies are the most cost-effective approach for commercial scale solar power generation in the sunbelt countries of the world. However, the question must be asked why no additional solar power plants have been built following the bankruptcy of the developer of the SEGS projects, LUZ International Limited. Although many believe the SEGS projects were a success as a result of parabolic trough technology they employ, in truth, the SEGS projects were developed simply because they represented an attractive opportunity for investors. Simply states, no additional projects have been developed because no one has been able to put together a similarly attractive financial package to potential investors. More than $1.2 billion in private capital was raised in debt and equity financing for the nine SEGS plants. Investors and bankers who make these investments are the real clients for solar power technologies. They are not interested in annual solar to electric efficiencies, but in risk, return on investments, and coverage ratios. This paper will take a look at solar power projects form the financier's perspective. The challenge in moving forward is to attract private investors, commercial lenders, and international development agencies and to find innovative solutions to the difficult issues that investment in the global power market poses for solar power technologies

  12. Chemistry in power plants 2011

    International Nuclear Information System (INIS)

    2011-01-01

    Within the VGB Powertech conference from 25th to 27th October, 2011, in Munich (Federal Republic of Germany), the following lectures and poster contributions were presented: (1) The revised VGB standard for water-steam-cycle Chemistry; (2) Switchover from neutral operation to oxygen treatment at the power station Stuttgart-Muenster of EnBW Kraftwerke AG; (3) Steam contamination with degradation products of organic matters present in the feedwater of the Lanxess-Rubber cogeneration plant; (4) Laboratory scale on-line noble metal deposition experiments simulating BWR plant conditions; (5) Building a new demin installation for the power plant EPZ in Borssele; (6) Replacement of the cooling tower installations in the nuclear power plant Goesgen-Daenien AG; (7) Aging of IEX resins in demin plants - Cost optimisation by adaptation of regenerants; (8) The largest DOW trademark EDI System at a combined cycled plant in Europe; (9) Upgrading river Main water to boiler feed water - Experiences with ultrafiltration; (10) Experiences with treatment of the water-steam-cycle in the RDF power plant Nehlsen Stavenhagen with film-forming amines; (11) Comparative modelling of the bubbles thermal collapse and cavitations for estimation of bubbles collapse influence; (12) Overcoming the steam quality - issues from an HRSG for the production of process steam; (13) Legionella - new requirements for power plant operation; (14) How the right chemistry in the FGD helps to improve the removal in the waste water treatment plant; (15) High efficiency filtration in dry/semi-dry FGD plants; (16) Expanding the variety of renewable fuels in the biomass power plant Timelkam using the chemical input control; (17) Corrosion, operating experiences and process improvements to increase the availability and operating time of the biomass power plant Timelkam; (18) The influence of temperature on the measurement of the conductivity of highly diluted solutions; (19) A multiparameter instrumentation approach

  13. Nuclear power plant

    International Nuclear Information System (INIS)

    Amamiya, Shu; Inagaki, Shuichi; Suzuki, Yasuhiro.

    1992-01-01

    The plant of the present invention can suppress the amount of clad in feedwater when drains of a moisture content separation heater or a high pressure feedwater heater are recovered. That is, the moisture content separation heater has ferrite or austenite type stainless steel heat transfer pipes. A chromium-enriched layer is formed on the surface of the heat transfer pipe by chromizing treatment or flame spraying. Then, a stainless steel heat transfer pipe having chromium-enriched layer is incorporated to at least one of the moisture content separation heater or the high pressure feedwater heater. During plant operation, the temperature of heated steams is as high as 235 to 282degC. Accordingly, this is a severe corrosion region for ferrite or austenite stainless steel. However, the chromium-enriched layer of excellent corrosion resistance is formed on the surface of the heat transfer pipe. Accordingly, metal ingredients are less leached. As a result, even if the drains are recovered to feedwater, increase of concentration of the clads in the feedwater can be prevented. (I.S.)

  14. Thermal Power Plant Performance Analysis

    CERN Document Server

    2012-01-01

    The analysis of the reliability and availability of power plants is frequently based on simple indexes that do not take into account the criticality of some failures used for availability analysis. This criticality should be evaluated based on concepts of reliability which consider the effect of a component failure on the performance of the entire plant. System reliability analysis tools provide a root-cause analysis leading to the improvement of the plant maintenance plan.   Taking in view that the power plant performance can be evaluated not only based on  thermodynamic related indexes, such as heat-rate, Thermal Power Plant Performance Analysis focuses on the presentation of reliability-based tools used to define performance of complex systems and introduces the basic concepts of reliability, maintainability and risk analysis aiming at their application as tools for power plant performance improvement, including: ·         selection of critical equipment and components, ·         defini...

  15. Prevalence of anopheles (Diptera: Culicidae) during sunset in areas of the Itaipu Hydroelectric Power Plant in Guaira County, State of Parana, Brazil; Prevalencia de anofelinos (Diptera: Culicidae) no crepusculo vespertino em areas da Usina Hidreletrica de Itaipu, no Municipio de Guaira, Estado do Parana, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Guimaraes, Anthony Erico; Mello, Rubens Pinto de; Lopes, Catarina Macedo; Alencar, Jeronimo; Gentile, Carla [Fundacao Inst. Oswaldo Cruz (FIOCRUZ), Rio de Janeiro, RJ (Brazil). Dept. de Entomologia. Lab. de Diptera

    1997-11-01

    Systematic collections of anophelines were conducted from November 1995 to August 1995 from 18:00 to 20:00 hr using Shannon traps and human-bait along the lake margin which forms the Itaipu Hydroelectric Reservoir, State of Parana, Brazil. Species prevalence was studied at 15 min intervals. Anopheles albitarsis sensu latu and An. galvaoi, were the most frequently collected mosquitoes. All Anopheles species populations peaked between 18:45 and 19:30 hr. The observations illustrate the existence of haematophagic activity cycle during the early evening hours: exogenous stimulus (the beginning of sunset) Shannon trap (light attraction) human bait (haematophagy) rest and digestion exogenous stimulus Shannon trap or surrounding vegetation. The greater abundance of An. albitarsis collected in human-bait and Shannon trap suggests it may be a potential malaria vector in the region. (author) 20 refs.

  16. The stakes of the hydroelectric power in the integrated management of the Basins. Which place for the EPTB; Les enjeux de l'hydroelectricite dans la gestion integree des bassins versants. Quelle place pour les EPTB

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-12-01

    In the framework of a sustainable development, the EPTB (Public, Territorial Institutions of Basins) need an evolution of the regulations concerning the management of the hydroelectric power (areas of the Adour, Dordogne, Garonne and Lot). This document presents in two parts the context and the stakes of the hydroelectric concession: the concessions specifications and the analysis of the main articles, the tariffs, taxes and the environment constraints. (A.L.B.)

  17. Methodology for maintenance analysis based on hydroelectric power stations reliability; Metodologia para realizar analisis de mantenimiento basado en confiabilidad en centrales hidroelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Rea Soto, Rogelio; Calixto Rodriguez, Roberto; Sandoval Valenzuela, Salvador; Velasco Flores, Rocio; Garcia Lizarraga, Maria del Carmen [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2012-07-01

    A methodology to carry out Reliability Centered Maintenance (RCM) studies for hydroelectric power plants is presented. The methodology is an implantation/extension of the guidelines proposed by the Engineering Society for Advanced Mobility Land, Sea and Space in the SAE-JA1012 standard. With the purpose of answering the first five questions, that are set out in that standard, the use of standard ISO14224 is strongly recommended. This approach standardizes failure mechanisms and homogenizes RCM studies with the process of collecting failure and maintenance data. The use of risk matrixes to rank the importance of each failure based on a risk criteria is also proposed. [Spanish] Se presenta una metodologia para realizar estudios de mantenimiento Basado en Confiabilidad (RCM) aplicados a la industria hidroelectrica. La metodologia es una implantacion/ extension realizada por los autores de este trabajo, de los lineamientos propuestos por la Engineering Society for Advanced Mobility Land, Sea and Space en el estandar SAE-JA1012. Para contestar las primeras cinco preguntas del estandar se propone tomar como base los modos y mecanismos de fallas de componentes documentados en la guia para recopilar datos de falla en el estandar ISO-14224. Este enfoque permite estandarizar la descripcion de mecanismos de fallas de los equipos, tanto en el estudio RCM como en el proceso de recopilacion de datos de falla y de mantenimiento, lo que permite retroalimentar el ciclo de mejora continua de los procesos RCM. Tambien se propone el uso de matrices de riesgo para jerarquizar la importancia de los mecanismos de falla con base en el nivel de riesgo.

  18. Economic viability in concrete dams by multivariable regression tool for implantation of small hydroelectric plants

    International Nuclear Information System (INIS)

    Lima, Reginaldo Agapito de; Ribeiro Junior, Leopoldo Uberto

    2010-01-01

    For implantation of a SHP, the barrage is the main structure where its sizing represents from 30% - 50% of general cost of civil works. Considering this it is very important to have a fast, didactic and accurate tool for elaborating a budget, also allowing a quantitative analysis of inherent cost for civil building of barrages concrete made for small hydropower plants. In face of this, the multi changing regression tool is very important as it allows a fast and correct establishing of preliminary costs, even approximate, for estimates of barrages in concrete cost, enabling to ease the budget, guiding feasibility decisions for selecting or neglecting new alternatives of fall. (author)

  19. Phlebotomine fauna (Diptera: Psychodidae) and putative vectors of leishmaniases in impacted area by hydroelectric plant, State of Tocantins, Brazil.

    Science.gov (United States)

    Vilela, Maurício Luiz; Azevedo, Carina Graser; Carvalho, Bruno M; Rangel, Elizabeth F

    2011-01-01

    Although leishmaniases are regarded as serious public health issues in the State of Tocantins, as consequence of the impact of environmental changes, small advances in taxonomic and ecological studies of Phlebotominae fauna are taking place in this state. The present study aimed to improve the knowledge about the sand flies, as well as about the aspects of the bioecology of leishmaniases vectors from Porto Nacional, a city that was directly impacted by the construction of Luís Eduardo Magalhães Hydroelectric Plant (HEP-Lajeado). Sand flies were collected monthly using CDC light traps and Shannon traps for a period of 40 consecutive months, at different monitoring stations, where 7162 specimens were collected and 48 species were detected. Among the species found, 22 are first records in the state and seven are considered important vectors of leishmaniases. Lutzomyia longipalpis, the vector of American Visceral Leishmaniasis (AVL) showed higher frequency in urban compared to rural areas, and Nyssomyia whitmani, the vector of American Cutaneous Leishmaniasis (ACL), predominated in rural areas. The frequency and habits of sand fly vectors are discussed considering environmental characteristics and climatic factors. The construction of dams requires a great amount of labor, therefore attracting people from elsewhere. Increased migration, without adequate structure, leads to bad living conditions in new and unplanned settlements. It also leads to deforestation associated with environmental impacts, which can facilitate the spread of leishmaniases. This study discusses the importance of Lu. longipalpis and Ny. whitmani on the transmission cycles of leishmaniases in Porto Nacional and the record of Bi. flaviscutellata in periurban area of the city.

  20. Energetic-economic dynamic computational analysis of plants with small capacity - Gera model

    International Nuclear Information System (INIS)

    Storfer, A.F.; Demanboro, A.C. de; Campello, C.A.G.B.

    1990-01-01

    A methodology and mathematical model for energy and economic analysis of hydroelectric power plants with low and medium capacity are presented. This methodology will be used for isolated or integrated hydroelectric power plants, including plants that part of their produced energy will go to the site market and part will go to regional electric system. (author)

  1. Soil erosion and sediment delivery issues in a large hydro-electric power reservoir catchment, Ethiopia

    Science.gov (United States)

    Nebiyu, Amsalu; Dume, Bayu; Bode, Samuel; Ram, Hari; Boeckx, Pascal

    2017-04-01

    restoration and reduction of sediment flux are considered. The long term sustainability of HEP power generation in Ethiopia is evaluated in this context.

  2. Operation of nuclear power plants

    International Nuclear Information System (INIS)

    Severa, P.

    1988-04-01

    The textbook for training nuclear power plant personnel is centred on the most important aspects of operating modes of WWER-440 reactors. Attention is devoted to the steady state operation of the unit, shutdown, overhaul with refuelling, physical and power start-up. Also given are the regulations of shift operation and the duties of individual categories of personnel during the shift and during the change of shifts. (Z.M.). 3 figs., 1 tab

  3. Load supply reliability evaluation applied to the house load of Itaipu power plant - a post operation analysis for the year 1992; A confiabilidade operativa de atendimento a carga da usina de Itaipu 50 Hz no ano de 1992 - uma avaliacao pos-operativa

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Rui J.G.C.; Almeida, Marcelino P. [Itaipu Binacional, Foz do Iguacu, PR (Brazil)

    1994-12-31

    This work presents the statistics of the 50 Hz Itaipu hydroelectric power plant in the 1992, under the aspect operative spinning reserve, comparing it with the obtained results through of the calculus of the operative reliability. (author) 7 refs.

  4. Evaluation of our hydroelectric resources

    International Nuclear Information System (INIS)

    Unsal, Istemi; Onoz, Bihrat

    2006-01-01

    Because of the geo energetic position of our country, its geo strategic importance becomes even greater due to the fact that one of the basic problems of our century is to meet the energy demand. In this study one of the most significant energy resources of our country, hydroelectric energy production resource has been made of subject and a general evaluation has been performed considering our country's conditions. In meeting countries general energy demands diversity of production sources and resources where they are supplied from shows great importance. Our country is quite rich from the aspect of hydroelectric potential which is the most significant among the renewable energy resources. That is why our hydroelectric potential (HEP) has been investigated by considering Feasibility, Operation Specifications, Economy, External Dependence issues in electrical energy planning.. In our country, it is frequently being emphasized that 35% of our HEP has been evaluated though which HEP is of subject, is not explained. While HEP is defined at 4 levels namely as Gross (GHEP), Technical (THEP), Economic (EHEP) and Evaluated HEPs. Our country is placed in 2nd place in Europe from the aspect of GHEP whereas it is placed as one of the last from the aspect of evaluated HEP. Capacity usage for hydroelectric plants has been foreseen as 40.5% (3548 hours/year) by the 2005-2020 planning prepared by ETKB (Ministry of Energy and Natural Resources). On the other hand, capacity usage has been found as 40.3% for the analysis for realized cases using DSI (State Water Works) 2006 data, which is only 0.5% below the foreseen value.What mainly lowers the realized average is the hard pressure applied to hydraulic plants during the period 1995-1999. The situation which arises as a result of this operation policy is wrongly interpreted by DPT (State Planning Organization) and consequently hydroelectric plants are defined as unreliable. However, since sufficient storage plants which will

  5. Building of nuclear power plant

    International Nuclear Information System (INIS)

    Saito, Takashi.

    1997-01-01

    A first nuclear plant and a second nuclear power plant are disposed in adjacent with each other in a building for a nuclear reactor. A reactor container is disposed in each of the plants, and each reactor container is surrounded by a second containing facility. A repairing chamber capable of communicating with the secondary containing facilities for both of the secondary containing facilities is disposed being in contact with the second containing facility of each plant for repairing control rod driving mechanisms or reactor incorporated-type recycling pumps. Namely, the repairing chamber is in adjacent with the reactor containers of both plants, and situated between both of the plants as a repairing chamber to be used in common for both plants. Air tight inlet/exit doors are formed to the inlets/exits of both plants of the repairing chamber. Space for the repairing chamber can be reduced to about one half compared with a case where the repairing chamber is formed independently on each plant. (I.N.)

  6. Power conditioning devices in nuclear power plants

    International Nuclear Information System (INIS)

    Shida, Toichi.

    1979-01-01

    Purpose: To automatically prevent the liquid level from lowering in a reactor even if a feedwater adjusting valve is locked in a bwr type nuclear power plant. Constitution: Where a feedwater adjusting valve should be locked, and if the mismatching degree between the main steam flow rate and the feedwater flow rate exceeds a predetermined value and the mismatched state continues for a certain period, the value set to a main control for setting the recycling flow rate is changed corresponding to the mismatching degree to compensate the same thereby preventing the liquid level from lowering in the reactor. (Ikeda, J.)

  7. Noise from wind power plants

    International Nuclear Information System (INIS)

    Ljunggren, S.

    2001-12-01

    First, the generation of noise at wind power plants and the character of the sound is described. The propagation of the sound and its dependence on the structure of the ground and on wind and temperature is treated next. Models for calculation of the noise emission are reviewed and examples of applications are given. Different means for reducing the disturbances are described

  8. Underwater nuclear power plant structure

    International Nuclear Information System (INIS)

    Severs, S.; Toll, H.V.

    1982-01-01

    A structure for an underwater nuclear power generating plant comprising a triangular platform formed of tubular leg and truss members upon which are attached one or more large spherical pressure vessels and one or more small cylindrical auxiliary pressure vessels. (author)

  9. World nuclear power plant capacity

    International Nuclear Information System (INIS)

    1991-01-01

    This report provides the background information for statistics and analysis developed by NUKEM in its monthly Market Report on the Nuclear Fuel Cycle. The assessments in this Special Report are based on the continuous review of individual nuclear power plant projects. This Special Report begins with tables summarizing a variety of nuclear power generating capacity statistics for 1990. It continues with a brief review of the year's major events regarding each country's nuclear power program. The standard NUKEM Market Report tables on nuclear plant capacity are given on pages 24 and 25. Owing to space limitations, the first year shown is 1988. Please refer to previous Special Reports for data covering earlier years. Detailed tables for each country list all existing plants as well as those expected by NUKEM to be in commercial operation by the end of 2005. An Appendix containing a list of abbreviations can be found starting on page 56. Only nuclear power plants intended for civilian use are included in this Special Report. Reactor lifetimes are assumed to be 35 years for all light water reactors and 30 years for all other reactor types, unless other data or definite decommissioning dates have been published by the operators. (orig./UA) [de

  10. Natural infection by Paramphistomoidea Stiles and Goldberger, 1910 trematodes in wild Marsh Deer (Blastocerus dichotomus Illiger, 1815) from Sérgio Mottas's hydroelectric power station flooding area.

    Science.gov (United States)

    do Nascimento, Cristiano G; do Nascimento, Adjair A; Mapeli, Elaine B; Tebaldi, José H; Duarte, José M B; Hoppe, Estevam G Lux

    2006-01-01

    Studies on helminthfauna of marsh deer Blastocerus dichotomus Illiger, 1815 are rare, although helminthic diseases are an important cause of mortality in these animals. Fifteen male and female adult marsh deer from Sergio Motta's hydroelectric power station flooding area at Paraná River which died during the capture and quarantine procedures, between 1998 and 1999, were necropsied. Three trematodes species, Paramphistomum cervi, Balanorchis anastrofus and Zygocotyle lunatum, all belonging to superfamily Paramphistomoidea, were identified. The obtained trematodes were identified, counted and their respectives descriptors of infection were determined. All necropsied animals were infected by helminths. Paramphistomum cervi was the most prevalent species, while Zygocotyle lunatum was found in only one animal.

  11. Contribution to the study of the determination of the remaining flow in deviation SHP (Small-Scale Hydroelectric Power Plants): the incorporation of the economic value of environmental resources; Contribuicao ao estudo da determinacao da vazao remanescente em PCHS (Pequenas Centrais Hidreletricas) de desvio: a incorporacao do valor economico de recursos ambientais

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Henrique Machado Moreira [Schlumberger, Itajuba, MG (Brazil)], e-mail: henriquemmsantos@yahoo.com.br; Santos, Afonso Henriques Moreira [Universidade Federal de Itajuba (UNIFEI/GEE/ISSE), MG (Brazil). Inst. de Sistemas Eletricos e Energia. Grupo de Estudos Energeticos], e-mail: afonsohms@gmail.com; Ribeiro Junior, Leopoldo Uberto, e-mail: leopoldo_junior@yahoo.com.br; Nascimento, Jose Guilherme Antloga do, e-mail: jgan@brasilpch.com.br

    2008-07-01

    This paper seems to develop the economic analysis of Small Hydro Plants - SHP, incorporating in this analysis evaluations of priceless losses for the society, as the environmental damages, taking SHP Paraitinga as the study case. It involves questions related to environmental valuation, economics, and engineering, presenting the concept of the Economic Valuation of Environmental Resources. The main valuation methods are presented. In the economic analysis, the concept of willingness to pay is verified by using demand function, that involves the elasticity and the price. The price is calculated based on costs and the elasticity is calculated based on the essentially of the goods or services, which could be reached by market observation. Only the remaining outflow definition, in the stretch of reduced outflow of the project will be studied. After these studies and valuations, some scenarios will be adopted for the developed model, on current values and projections. A comparison of the present work and the methodology of commitment programming are carried out. Finally the results will be analyzed, trying to get the 'optimum outflow', aiming at balancing power, tourism and environmental interests. (author)

  12. Nuclear power plant life management

    International Nuclear Information System (INIS)

    Rorive, P.; Berthe, J.; Lafaille, J.P.; Eussen, G.

    1998-01-01

    Several definitions can be given to the design life of a nuclear power plant just as they can be attributed to the design life of an industrial installation: the book-keeping life which is the duration of the provision for depreciation of the plant, the licensed life which corresponds to the duration for which the plant license has been granted and beyond which a new license should be granted by the safety authorities, the design life which corresponds to the duration specified for ageing and fatigue calculations in the design of some selected components during the plant design phase, the technical life which is the duration of effective technical operation and finally the economic life corresponding to the duration of profitable operation of the plant compared with other means of electricity production. Plant life management refers to the measures taken to cope with the combination of licensed, design, technical and economical life. They can include repairs and replacements of components which have arrived to the end of their life due to known degradation processes such as fatigue, embrittlement, corrosion, wear, erosion, thermal ageing. In all cases however, it is of great importance to plan the intervention so as to minimise the economic impact. Predictive maintenance is used together with in-service inspection programs to fulfil this goal. The paper will go over the methodologies adopted in Belgium in all aspects of electrical, mechanical and civil equipment for managing plant life. (author)

  13. Canton hydroelectric project: feasibility study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The Canton Hydroelectric Project study was undertaken to determine the feasibility of redeveloping hydroelectric power generation facilities at the Upper and Lower Dams on the Farmington River at Collinsville, CT. The integrity of the existing dams and power plants was investigated and found to be generally adequate. The intake channels, powerhouses and tailraces will require refurbishing but no major repairs. The Lower Dam will require some repair to correct surface deterioration conditions. New flashboard installations are contemplated for both the dams. Energy production operational studies were performed on 25 generating unit alternatives for the two sites. Detailed cost estimates were prepared for seven Upper and five Lower site alternatives, and a detailed economic analysis of ten project alternatives was performed. The economic analysis included 3 power marketing options and the future escalation of the value of energy. The conclusions of this study were: the project is economically feasible on a 40-y life cycle basis; short-term financing, bond payment adjustments, or other special financial arrangements will be needed to provide for the negative cash flow during the early years of operation; and the Town of Canton should further pursue the power marketing and financing aspects of the project. (LCL)

  14. Evaluation of Hydraulic Potentiality for Small Scale Hydroelectric Power Systems. Base for formulation of plans for the municipal development

    International Nuclear Information System (INIS)

    Torres Q, E.

    1997-01-01

    Colombia has been recognized as the fourth country in the world with high hydraulic resources, the best way to exploit this potential is by talking use of as a main hydroelectric alternative on isolated areas of the country. At the beginnings there was an study the Potential Hydraulic Assessment was performed at the Chicamocha Deep Valley, due to this area count with a good hydrologic and meteorological network enough, to investigate the hydro climate behavior

  15. A UK guide to intake fish-screening regulations, policy and best practice with particular reference to hydroelectric power schemes

    Energy Technology Data Exchange (ETDEWEB)

    Turnpenny, A.W.H.; Struthers, G.; Hanson, P.

    1998-07-01

    A review of fish screening regulations in England, Wales, Scotland, and Northern Ireland is presented, and a summary of findings on screening legislation is given. The views of hydroelectric scheme developers, owners and operators are considered, and recommendations including the development of a risk assessment procedure are discussed. Fish screening technology, bypasses and other escape routes, and common fault in screen design and operation are examined, and guidance to Best Practice is given. (UK)

  16. What tools do we have to study the morphological effects of hydroelectric plants in developing countries? The Chilean case

    Science.gov (United States)

    Alcayaga, Hernan; Caamaño, Diego; Palma, Sebastian; Contreras, Karla

    2017-04-01

    Countries growing rates are directly related to energy production. Therefore, developed and developing nations are focused on hydropower and dam construction; on the contrary dam removal practices are significantly different among nations, demonstrating the former group a lesser interest on removing structures. Chiles hydropower generation corresponds to 50% of the current grid, having a potential capacity to double the current situation. Thus: ¿What tools can we apply to assess the potential impacts on our rivers? The goal of this project is to study two different reaches located in two separates streams in Central Chile. The Aconcagua River represents a mountain stream (i.e. steep, narrow, and confined) subject to the operation of a hydroelectric system composed by five diversion hydropower plants built during the 90`s. The Rapel River reach corresponds to the last 10km upstream to the outlet; it is a mild and wide stream that includes the gravel-sand transition. The Rapel dam operates about 25km upstream this second reach that is characterized by an 112m wall built in 1968. The Aconcagua hydropower system was characterized within a GIS environment and a morphological response conceptual model applied. The model uses two indexes to evaluate changes in i) channel forming discharge and ii) sediment supply. The provided response shows the trends and magnitudes of the changes, based in eighth possible directions for ten morphological responsible variables. The Rapel river system was evaluated differently and sampling of sediments characteristics (D50 and armour index), discharge index for both before and after the dam operation, Morphological Quality Index (IQM) and an analysis of aerial photography time series were performed. Results showed that the hydrology indicator impacts for the Aconcagua system were more severe than the impacts on sediments transport (typically the case for diversion type hydropower). A fine armour layer was found within the Rapel river site

  17. Shaping a Geothermal Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Bouma, John

    1980-12-01

    The design comprises a ''grassroots'' geothermal steam electric generating plant located approximately 34 miles west of the city of Los Alamos. The plant is located on the Baca Ranch in the Redondo Creek area some 4-1/2 miles north of the southwest entrance of the ranch. This plant will utilize the geothermal brine well system that has been explored by the Union Geothermal Company of New Mexico. The gross plant capacity will be approximately 50,000 kW and will not be expanded since well gathering beyond a 50 MW generating capacity is considered uneconomical. The plant is generally comprised of four major building blocks, namely the power building, the cooling tower and intake structure, the switchyard and the H{sub 2}S abatement system. Some twelve (12) alternatives were studied for economic and technical feasibility. In addition some innovative design concepts were applied to arrive at a functional and cost effective design. The plant incorporates a hydrogen sulfide emission abatement system, the design of which has been guaranteed by the equipment manufacturer to meet the specified emission limits.

  18. Nuclear power plants and environment

    International Nuclear Information System (INIS)

    Agudo, E.G.; Penteado Filho, A.C.

    1980-01-01

    The question of nuclear power plants is analysed in details. The fundamental principles of reactors are described as well as the problems of safety involved with the reactor operation and the quantity and type of radioactive released to the environment. It shows that the amount of radioactive is very long. The reactor accidents has occurred, as three mile island, are also analysed. (M.I.A.)

  19. Siting commercial fusion power plants

    International Nuclear Information System (INIS)

    Young, J.R.

    1976-09-01

    This document discusses siting requirements for fusion power plants. The current concept of the reference first commercial reactors was developed from analysis of the characteristics of current design concepts. Because those reactors use the deuterium-tritium fuel reaction, large quantities of activation products and tritium are created and must be considered as potential sources of radiation doses (Young, 1976 and Young and Gore, 1976). However, advanced reactors using fuel reactions that neither consume nor create radionuclides are briefly considered

  20. Availability of thermal power plants

    International Nuclear Information System (INIS)

    Nitsch, D.; Schmitz, H.

    1981-01-01

    Availability data based on unique uniform, and clearly defined concepts and methods of acquisition have been compiled by the VGB since 1970. The data are published in anual reports. These reports contain availability data of fossil-fuelled units, combined gas/steam units, nuclear power plants, and gas turbine plants in Germany and abroad, listed by unit size fuel type, time of operation, and application. For the purpose of comparison, the data for the years since 1970 are presented as well as data averaged for the whole period under report. The main results for the year 1980 are presented now that the greater part of the plants has been evaluated. The complete evaluation will be published towards the end of 1981. (orig.) [de

  1. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2003-01-01

    This 2003 version of Elecnuc contents information, data and charts on the nuclear power plants in the world and general information on the national perspectives concerning the electric power industry. The following topics are presented: 2002 highlights; characteristics of main reactor types and on order; map of the French nuclear power plants; the worldwide status of nuclear power plants on 2002/12/3; units distributed by countries; nuclear power plants connected to the Grid by reactor type groups; nuclear power plants under construction; capacity of the nuclear power plants on the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear plants by country at the end 2002; performance indicator of french PWR units; trends of the generation indicator worldwide from 1960 to 2002; 2002 cumulative Load Factor by owners; nuclear power plants connected to the grid by countries; status of license renewal applications in Usa; nuclear power plants under construction; Shutdown nuclear power plants; exported nuclear power plants by type; exported nuclear power plants by countries; nuclear power plants under construction or order; steam generator replacements; recycling of Plutonium in LWR; projects of MOX fuel use in reactors; electricity needs of Germany, Belgium, Spain, Finland, United Kingdom; electricity indicators of the five countries. (A.L.B.)

  2. A contribution for cost's study of small brazilian hydro power plants

    International Nuclear Information System (INIS)

    Santos, A.H.M.; Martinez, C.B.; Bajay, S.V.

    1987-01-01

    In the project of Small Hydro Power Plants (SHPP) it is essential to know in advance an estimated cost of the structures and equipment. In this paper, the equations for these costs are presented. They were obtained from data taken from twenty projects that followed the Handbook of Small Hydroelectric Plants, published by ELETROBRAS and DNAEE (Brazil). A critical comparative analysis between the proposed method and the CEHPAR (Hydraulics and Hydrology Center Prof. Parigot de Souza) procedure is carried out, and a combined use of both methods is recommended. (author)

  3. Integrity and life estimation of turbine runner cover in a hydro power plant

    Directory of Open Access Journals (Sweden)

    A. Sedmak

    2016-03-01

    Full Text Available This paper presents integrity and life estimation of turbine runner cover in a vertical pipe turbines, Kaplan 200 MW nominal output power, produced in Russia, and built in six hydro-generation units of hydroelectric power plant „Đerdap 1” in Serbia. Fatigue and corrosion-fatigue interaction have been taken into account using experimentally obtained material properties, as well as analytical and numerical calculations of stress state, to estimate appropriate safety factors. Fatigue crack growth rate, da/dN, was also calculated, indicated that internal defects of circular or elliptical shape, found out by ultrasonic testing, do not affect reliable operation of runner cover.

  4. Nuclear Power Plant (NPP) safety in Brazil

    International Nuclear Information System (INIS)

    Lederman, L.

    1980-01-01

    The multidisciplinary aspects of the activities involved in the nuclear power plant (NPP) licensing, are presented. The activities of CNEN's technical staff in the licensing of Angra-1 and Angra-2 power plants are shown. (E.G.) [pt

  5. Fusion power plant simulations: a progress report

    Energy Technology Data Exchange (ETDEWEB)

    Cook, J.M.; Pattern, J.S.; Amend, W.E.

    1976-01-01

    The objective of the fusion systems analysis at ANL is to develop simulations to compare alternative conceptual designs of magnetically confined fusion power plants. The power plant computer simulation progress is described. Some system studies are also discussed. (MOW)

  6. Robots for nuclear power plants

    International Nuclear Information System (INIS)

    Moore, T.

    1985-01-01

    In many industrial applications of robots, the objective is to replace human workers with machines that are more productive, efficient, and accurate. But for nuclear applications, the objective is not so much to replace workers as it is to extend their presence - for example, to project their reach into areas of a nuclear plant where the thermal or radiation environment prohibits or limits a human presence. The economic motivation to use robots for nuclear plant inspection and maintenance is centered on their potential for improving plant availability; a by-product is the potential for reducing the occupational radiation exposure of plant personnel. Robotic equipment in nuclear applications may be divided into two broad categories: single-purpose devices with limited ability to perform different operations, and reprogrammable, multi-purpose robots with some degree of computer-based artificial intelligence. Preliminary assessments of the potential for applying robotics in nuclear power plants - mainly at surveillance and inspection tasks - have been carried out. Future developments are considered

  7. Atucha I nuclear power plant transients analysis

    International Nuclear Information System (INIS)

    Castano, J.; Schivo, M.

    1987-01-01

    A program for the transients simulation thermohydraulic calculation without loss of coolant (KWU-ENACE development) to evaluate Atucha I nuclear power plant behaviour is used. The program includes systems simulation and nuclear power plants control bonds with real parameters. The calculation results show a good agreement with the output 'protocol' of various transients of the nuclear power plant, keeping the error, in general, lesser than ± 10% from the variation of the nuclear power plant's state variables. (Author)

  8. Power control of the Angra-2 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Souza Mendes, J.E. de

    1986-01-01

    The systems for the power control of the Nuclear Power Plant Angra 2 have a high degree of automation so that few operator actions are required during power operation. The power control strategy and the operation principles of the control systems, here presented, make possible a great flexibility of the Plant operation. (Author) [pt

  9. 78 FR 26747 - Oglethorpe Power Corporation: Proposed Biomass Power Plant

    Science.gov (United States)

    2013-05-08

    ... DEPARTMENT OF AGRICULTURE Rural Utilities Service Oglethorpe Power Corporation: Proposed Biomass Power Plant AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability of a Record of... Environmental Impact Statement (EIS) related to providing financial assistance to the Oglethorpe Power...

  10. 76 FR 20624 - Oglethorpe Power Corporation: Proposed Biomass Power Plant

    Science.gov (United States)

    2011-04-13

    ... DEPARTMENT OF AGRICULTURE Rural Utilities Service Oglethorpe Power Corporation: Proposed Biomass Power Plant AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability of a Draft... financial assistance to Oglethorpe Power Corporation (Oglethorpe) for the construction of a 100 megawatt (MW...

  11. Power control device of an atomic power plant

    International Nuclear Information System (INIS)

    Ootsuka, Shiro; Ito, Takero.

    1980-01-01

    Purpose: To improve the power controllability of an atomic power plant by improving the controllability, response and stability of the recirculation flow rate. Constitution: The power control device comprises a power detector of the reactor, which detects and operates the reactor power from the thermal power, neutron flux or the process quantity controlling the same, and a deviation detector which seeks deviation between the power signal of the power detector and the power set value of the reactor or power station. By use of the power control device constituted in this manner, the core flow rate is regulated by the power signal of the deviation detector thereby to control the power. (Aizawa, K.)

  12. Heat Rate Enhancement of IGCC Power Plant Coupled with Solar thermal power plant

    OpenAIRE

    Kotdawala, Rasesh R; V., Jyothi; Kanaujia, Gaurav; Adapa, Bharath

    2016-01-01

    Integrated gasification  combined cycle power plant (IGCC) has shown the potential of having higher operating thermal efficiency, than supercritical thermal power plants as it combines the advantages of coal gasification and combined cycle power plant. Solar thermal plant has shown great promise to augment the thermal efficiency of the fossil based power plants and reducing CO2 emissions. In this research paper, impact of integrating solar thermal power plant utilizing linear Fresnel collecto...

  13. Intelligent power plant simulator for educational purposes

    International Nuclear Information System (INIS)

    Seifi, A.; Seifi, H.; Ansari, M. R.; Parsa Moghaddam, M.

    2001-01-01

    An Intelligent Tutoring System can be effectively employed for a power plant simulator so that the need for instructor in minimized. In this paper using the above concept as well as object oriented programming and SIMULINK Toolbox of MATLAB, an intelligent tutoring power plant simulator is proposed. Its successful application on a typical 11 MW power plant is demonstrated

  14. Simulators for nuclear power plants

    International Nuclear Information System (INIS)

    Ancarani, A.; Zanobetti, D.

    1983-01-01

    The different types of simulator for nuclear power plants depend on the kind of programme and the degree of representation to be achieved, which in turn determines the functions to duplicate. Different degrees correspond to different simulators and hence to different choices in the functions. Training of nuclear power plant operators takes advantage of the contribution of simulators of various degrees of complexity and fidelity. Reduced scope simulators are best for understanding basic phenomena; replica simulators are best used for formal qualification and requalification of personnel, while modular mini simulators of single parts of a plant are best for replay and assessment of malfunctions. Another category consists of simulators for the development of assistance during operation, with the inclusion of disturbance and alarm analysis. The only existing standard on simulators is, at present, the one adopted in the United States. This is too stringent and is never complied with by present simulators. A description of possible advantages of a European standard is therefore offered: it rests on methods of measurement of basic simulator characteristics such as fidelity in values and time. (author)

  15. Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power at the Maxwell locks and dam, Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal, institutional and financial obstacles, and incentives to the development of hydroelectric power at the Maxwell locks and dam on the Monongahela River are analyzed. The study is one of five studies prepared by the Energy Law Institute pursuant to a contract with the National Conference of State Legislators. Each of the five studies views dam development by a different category of developer. These categories include a municipality, a public utility, a state, a private developer, and a cooperative. The Maxwell case study concerns potential development by Allegheny Electric Cooperative. Thus, the analysis of obstacles and incentives is focused on those factors which have particular impact on a cooperative. Subjects covered include a description of the site; developer description; the feasibility study; the economic feasibility; financing; Federal licensing by FERC; state licensing; local interest and requirements; the effect of locks and dam operation by the Army Corp of Engineers; and power marketing.

  16. Occupational dose control in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Viktorsson, C.; Lochard, J.; Benedittini, M.; Baum, J.; Khan, T.A.

    1990-01-01

    Reduction in occupational exposure at nuclear power plants is desirable not only in the interest of the health and safety of plant personnel, but also because it enhances the safety and reliability of the plants. This report summarises the current trends of doses to workers at nuclear power plants and the achievements and developments regarding methods for their reduction

  17. Optimal control of hydroelectric facilities

    Science.gov (United States)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  18. The impacts of wind power integration on sub-daily variation in river flows downstream of hydroelectric dams.

    Science.gov (United States)

    Kern, Jordan D; Patino-Echeverri, Dalia; Characklis, Gregory W

    2014-08-19

    Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. However, more coordinated use of wind and hydropower resources may exacerbate the impacts dams have on downstream environmental flows, that is, the timing and magnitude of water flows needed to sustain river ecosystems. In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). Results show that the greatest potential for wind energy to impact downstream flows occurs at high (∼25%) wind market penetration, when the dam sells more reserves in order to exploit spikes in real-time electricity prices caused by negative wind forecast errors. Nonetheless, compared to the initial impacts of dam construction (and the dam's subsequent operation as a peaking resource under baseline conditions) the marginal effects of any increased wind market penetration on downstream flows are found to be relatively minor.

  19. Design of nuclear power plants

    International Nuclear Information System (INIS)

    Lobo, C.G.

    1987-01-01

    The criteria of design and safety, applied internationally to systems and components of PWR type reactors, are described. The main criteria of the design analysed are: thermohydraulic optimization; optimized arrangement of buildings and components; low costs of energy generation; high level of standardization; application of specific safety criteria for nuclear power plants. The safety criteria aim to: assure the safe reactor shutdown; remove the residual heat and; avoid the release of radioactive elements for environment. Some exemples of safety criteria are given for Angra-2 and Angra-3 reactors. (M.C.K.) [pt

  20. Licensing of nuclear power plants

    International Nuclear Information System (INIS)

    Witt, S. de.

    1984-01-01

    De Witt, who as an advocate represents the interests of citizen's initiatives in lawsuits concerning nuclear power plants, contests an independent scope of discretion of the administration and criticizes the reduction of the control density of courts which can be noticed recently. The shift of emphasis from the courts to the administration would not only change the balance within the constitutional separation of powers but could also lead to a weakening of the protection of fundamental rights. When assessing the technical risks he wants above all to take into account the possible extent of the damage. De Witt also shows that - beyond the discretion of refusal according to section 7 of the Atomic Energy Act and the exertion of influence of the executive on public utilities - it could be possible to develop means - not used until now - to control the social impacts of nuclear energy. (orig./HSCH) [de

  1. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  2. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  3. Sabotage at Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Purvis, James W.

    1999-07-21

    Recently there has been a noted worldwide increase in violent actions including attempted sabotage at nuclear power plants. Several organizations, such as the International Atomic Energy Agency and the US Nuclear Regulatory Commission, have guidelines, recommendations, and formal threat- and risk-assessment processes for the protection of nuclear assets. Other examples are the former Defense Special Weapons Agency, which used a risk-assessment model to evaluate force-protection security requirements for terrorist incidents at DOD military bases. The US DOE uses a graded approach to protect its assets based on risk and vulnerability assessments. The Federal Aviation Administration and Federal Bureau of Investigation conduct joint threat and vulnerability assessments on high-risk US airports. Several private companies under contract to government agencies use formal risk-assessment models and methods to identify security requirements. The purpose of this paper is to survey these methods and present an overview of all potential types of sabotage at nuclear power plants. The paper discusses emerging threats and current methods of choice for sabotage--especially vehicle bombs and chemical attacks. Potential consequences of sabotage acts, including economic and political; not just those that may result in unacceptable radiological exposure to the public, are also discussed. Applicability of risk-assessment methods and mitigation techniques are also presented.

  4. Sabotage at Nuclear Power Plants

    International Nuclear Information System (INIS)

    Purvis, James W.

    1999-01-01

    Recently there has been a noted worldwide increase in violent actions including attempted sabotage at nuclear power plants. Several organizations, such as the International Atomic Energy Agency and the US Nuclear Regulatory Commission, have guidelines, recommendations, and formal threat- and risk-assessment processes for the protection of nuclear assets. Other examples are the former Defense Special Weapons Agency, which used a risk-assessment model to evaluate force-protection security requirements for terrorist incidents at DOD military bases. The US DOE uses a graded approach to protect its assets based on risk and vulnerability assessments. The Federal Aviation Administration and Federal Bureau of Investigation conduct joint threat and vulnerability assessments on high-risk US airports. Several private companies under contract to government agencies use formal risk-assessment models and methods to identify security requirements. The purpose of this paper is to survey these methods and present an overview of all potential types of sabotage at nuclear power plants. The paper discusses emerging threats and current methods of choice for sabotage--especially vehicle bombs and chemical attacks. Potential consequences of sabotage acts, including economic and political; not just those that may result in unacceptable radiological exposure to the public, are also discussed. Applicability of risk-assessment methods and mitigation techniques are also presented

  5. Assessment of spermatogenesis and plasma sex steroids in a seasonal breeding teleost: a comparative study in an area of influence of a tributary, downstream from a hydroelectric power dam, Brazil.

    Science.gov (United States)

    Domingos, Fabricio F T; Thomé, Ralph G; Arantes, Fabio P; Castro, Antonio Carlos S; Sato, Yoshimi; Bazzoli, Nilo; Rizzo, Elizete

    2012-12-01

    River damming and building of hydroelectric power plants interrupt the reproductive migration routes and change the major physicochemical parameters of water quality, with drastic consequences for populations of migratory fishes. The goal of this study was to evaluate proliferation and cell death during spermatogenesis and serum profiles of sex steroids in Prochilodus argenteus, from the São Francisco River, downstream from the Três Marias Dam. A total of 257 adult males were caught quarterly during a reproductive cycle in two sites: the first 34 km of the river after the dam (site 1) and the second 34-54 km after the dam (site 2), after the confluence with a tributary, the Abaeté River. Seasonal changes in the testicular activity associated with morphometric analyses of germ cells as well as proliferation and testicular apoptosis support a more active spermatogenesis in fish from site 2, where higher levels of sex steroids and gonadosomatic index (GSI) were also found. In site 1, fish presented low serum levels of testosterone, 17β-estradiol and 17α-hydroxyprogesterone and a low GSI during gonadal maturation. Spermatogonial proliferation (PCNA) and apoptosis (TUNEL) were more elevated in fish from site 1, but spermatocytes were mainly labelled in fish from site 2. Overall, these data demonstrate changes in testicular activity and plasma sex steroids in a neotropical teleost fish living downstream from a hydroelectric dam, supplying new data on fish reproduction in regulated rivers. Moreover, morphometric analyses associated with sex steroids profiles provide reliable tools to assess fish spermatogenesis under environmental stress conditions.

  6. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Migaud, D.; Hutin, J.P.; Jouette, I.; Eymond, P.; Devie, P.; Cudelou, C.; Magnier, S.; Frydman, M.

    2016-01-01

    This document gathers different articles concerning the maintenance of the French nuclear power plants. The first article analyses the impact of the recent law on the energetic transition that sets the share of nuclear power at 50% of the electricity produced by 2025. A consequence may be the decommissioning of 17 to 20 reactors by 2025 and the huge maintenance program called 'Grand Carenage' whose aim is to extend operating life over 40 years will have to be re-considered in order to avoid useless expenses. The second article shows that in 2015 the French nuclear reactor fleet got very good results in terms of availability and safety. There were 49 scheduled outages and among them some ended ahead of time. The third article describes the specificities of the maintenance of a nuclear power plant, for instance the redundancy of some systems implies that maintenance has to deal with systems that have never functioned but must be ready to operate at any moment. Another specificity is the complexity of a nuclear power plant that implies an essential phase of preparation for maintenance operations. Because of safety requirements any maintenance operation has to be controlled, checked and may provide feedback. The fourth article presents the 'Grand Carenage' maintenance program that involves the following operations: the replacement of steam generators, the re-tubing of condensers, the replacement of the filtering drums used for cooling water, the testing of the reactor building, the hydraulic test of the primary circuit and the inspection of the reactor vessel. The fifth article focuses on the organization of the work-site for maintenance operations and the example of the Belleville-sur-Loire is described in the sixth article. Important maintenance operations like 'Grand Carenage' requires a strong collaboration with a network of specialized enterprises and as no reactor (except Flamanville EPR) is being built in France, maintenance

  7. Genetic variability of wild populations of Leporinus elongatus in the São Domingos River - MS Brazil: a preliminary view on the construction of the hydroelectric plant

    Directory of Open Access Journals (Sweden)

    Ricardo Pereira Ribeiro

    2016-09-01

    Full Text Available Most of the electricity used in Brazil comes from hydroelectric plants, mainly due to the great availability of its water resources. However, the construction of these plants denotes serious problems related to migration of native fish and the genetic conservation of stocks. Current study evaluates two wild population of Leporinus elongatus (piapara located downstream (Population A - PopA and upstream (Population B - PopB of the Cachoeira Branca before the construction of the São Domingos hydroelectric plant (HPP in the Mato Grosso do Sul State, Brazil. Thirty samples from caudal fins were collected and analyzed for each population. Eighty-nine fragments, including 72 polymorphic ones (80.9%, were analyzed. Low fragments (less than 0.100 in both populations (PopA = 2 and PopB = 3 were identified. Nine fixed fragments (frequency 1.000 (PopA = 3 and PopB = 6, and four exclusive fragments (PopA = 3 and PopB = 1 were also reported. The genetic variability within populations, calculated by Shannon Index and by percentage of polymorphic fragments, indicated high rates of intrapopulation variability (PopA = 0.309 and 61.80% and PopB = 0.392 and 71.90%, respectively. Genetic distance and identity rates (0.089 and 0.915, respectively were different between populations, whilst AMOVA showed that most variations lie within the populations and not between them. Fst and Nm rates showed moderate genetic differentiation with low numbers of migrants. Results reveal populations with high intra-population genetic variability and genetic differentiation, with low gene flow. The passage ladders of São Domingos HPP should control fish transposition to preserve genetic variability.

  8. Energy analysis and projecting of power plants

    International Nuclear Information System (INIS)

    Jirlow, K.

    1975-01-01

    Energy analysis aims at a better explanation of energy flow and energy exchange at different production processes. In this report the energy budget is analysed for separate nuclear power plants and for expanding systems of power plants. A mathematical model is developed for linear and exponential expanding of nuclear power. The profitableness for nuclear power plants in Sweden is considered to be good. (K.K.)

  9. Thermal power plant design and operation

    CERN Document Server

    Sarkar, Dipak

    2015-01-01

    Thermal Power Plant: Design and Operation deals with various aspects of a thermal power plant, providing a new dimension to the subject, with focus on operating practices and troubleshooting, as well as technology and design. Its author has a 40-long association with thermal power plants in design as well as field engineering, sharing his experience with professional engineers under various training capacities, such as training programs for graduate engineers and operating personnel. Thermal Power Plant presents practical content on coal-, gas-, oil-, peat- and biomass-fueled thermal power

  10. Plant life management optimized utilization of existing nuclear power plants

    International Nuclear Information System (INIS)

    Watzinger, H.; Erve, M.

    1999-01-01

    For safe, reliable and economical nuclear power generation it is of central importance to understand, analyze and manage aging-related phenomena and to apply this information in the systematic utilization and as-necessary extension of the service life of components and systems. An operator's overall approach to aging and plant life management which also improves performance characteristics can help to optimize plant operating economy. In view of the deregulation of the power generation industry with its increased competition, nuclear power plants must today also increasingly provide for or maintain a high level of plant availability and low power generating costs. This is a difficult challenge even for the newest, most modern plants, and as plants age they can only remain competitive if a plant operator adopts a strategic approach which takes into account the various aging-related effects on a plant-wide basis. The significance of aging and plant life management for nuclear power plants becomes apparent when looking at their age: By the year 2000 roughly fifty of the world's 434 commercial nuclear power plants will have been in operation for thirty years or more. According to the International Atomic Energy Agency, as many as 110 plants will have reached the thirty-year service mark by the year 2005. In many countries human society does not push the construction of new nuclear power plants and presumably will not change mind within the next ten years. New construction licenses cannot be expected so that for economical and ecological reasons existing plants have to be operated unchallengeably. On the other hand the deregulation of the power production market is asking just now for analysis of plant life time to operate the plants at a high technical and economical level until new nuclear power plants can be licensed and constructed. (author)

  11. Nuclear power plant operation 2016. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2017-05-15

    A report is given on the operating results achieved in 2016, events important to plant safety, special and relevant repair, and retrofit measures from nuclear power plants in Germany. Reports about nuclear power plants in Belgium, Finland, the Netherlands, Switzerland, and Spain will be published in a further issue.

  12. Environmental survey around EDF nuclear power plants

    International Nuclear Information System (INIS)

    Foulquier, L.

    1992-01-01

    Description of various types of environmental test carried out under the responsibility of the Operator of nuclear power plants in France, with taking Fessenheim nuclear power plant as an example: permanent monitoring of radioactivity, periodic radioecological assessments, main results of measurements taken, showing that there are no detectable effects of the plant on the environment, policy of openness by publication of these results

  13. Floristic and phytosociology in dense “terra firme” rainforest in the Belo Monte Hydroelectric Plant influence area, Pará, Brazil

    Directory of Open Access Journals (Sweden)

    DAN. Lemos

    Full Text Available Abstract The objective of the present study was to characterise the floristic and phytosociological composition on a stretch of dense “Terra Firme” rainforest located in the Belo Monte hydroelectric plant area of influence, located in the state of Pará, Brazil. All trees with DAP >10 cm situated in 75 permanent plots of 1 ha were inventoried. 27,126 individuals trees (361 ind.ha-1, distributed in 59 botanical families, comprising 481 species were observed. The families with the largest number of species were Fabaceae (94, Araceae (65 and Arecaceae (43, comprising 43.7% of total species. The species Alexa grandiflora (4.41, Cenostigma tocantinum (2.50 and Bertholletia excelsa (2.28 showed the highest importance values (IV. The ten species with greater IV are concentrated (22%. The forest community has high species richness and can be classified as diverse age trees, heterogeneous and of medium conservation condition.

  14. Legal and institutional aspects of the Public Auction 038/08 to approve changes in the authorizations of small hydroelectric power plant: absence of risk analysis; Aspectos legais e institucionais da audiencia publica 038/08 para aprovar mudancas na autorizacao de PCHS: a analise de riscos que faltou fazer

    Energy Technology Data Exchange (ETDEWEB)

    Pugnaloni, Ivo Augusto de Abreu [Enercons Consultoria em Energia Ltda, Curitiba, PR (Brazil)], E-mail: ivo@enercons.com.br

    2011-07-15

    The National Regulation Agency of Electrical Energy of Brazil, ANEEL, submitted to the Public Auction 038/08, a new project of regulation destined to turn easier the authorization of small hydropower stations, without mention to the risks that the new criteria could bring, moreover to the environment. This work does an analysis about this risks to the investors, to the riverside communities, and the society. With information from the site www.aneel.gov.br the work shows the important difficulties that ANEEL has, in terms of personal quantities, to approve projects and accomplish the supervising of construction activities. The work concludes that this is the true cause of the actual retard in the project and conclusion of the plants and that the new rules contain many and important risks. And more, that if the actual ANEEL difficulties still being, they have the capacity to turn Brazil more dependant of natural gas to supply its necessities of electric energy. (author)

  15. Hydrochemical characterization of groundwaters in projected hydroelectric power plant areas: Taquari-Antas Basin/RS, Brazil; Caracterizacao hidrogeoquimica de agua subterranea em area de influencia de futuras instalacoes de usinas hidreletricas - bacia hidrografica do rio Taquari-Antas/RS, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Scopel, Rejane Maria; Teixeira, Elba Calesso; Binotto, Raquel Barros [Fundacao Estadual de Protecao Ambiental Henrique Luis Roessler, Porto Alegre, RS (Brazil)]. E-mail: gerpro.pesquisa@fepam.rs.gov.br

    2005-06-01

    The identification and characterization of the hydrochemistry of the groundwaters has been done for seven wells. The sampling occurred during three bimonthly campaigns. The results classified the waters as of the calcium bicarbonated type for the majority of the samples, except for one well, whose composition is of the sodium bicarbonated type. The major ions found and how they determine the quality parameters are consistent with the reactions of mineral dissolution of the majority of volcanic rocks and the reactions with intrusion of alkaline rock in only one well. Anomalous values of nitrate in some wells alert to the impact of especially polluting sources at the time the reservoirs of the hydroeletric plant were formed. (author)

  16. EPRI nuclear power plant decommissioning technology program

    International Nuclear Information System (INIS)

    Kim, Karen S.; Bushart, Sean P.; Naughton, Michael; McGrath, Richard

    2011-01-01

    The Electric Power Research Institute (EPRI) is a non-profit research organization that supports the energy industry. The Nuclear Power Plant Decommissioning Technology Program conducts research and develops technology for the safe and efficient decommissioning of nuclear power plants. (author)

  17. QA programs in nuclear power plants

    International Nuclear Information System (INIS)

    Ellingson, A.C.

    1976-01-01

    As an overview of quality assurance programs in nuclear power plants, the energy picture as it appears today is reviewed. Nuclear power plants and their operations are described and an attempt is made to place in proper perspective the alleged ''threats'' inherent in nuclear power. Finally, the quality assurance programs being used in the nuclear industry are described

  18. Nuclear power plant component protection

    International Nuclear Information System (INIS)

    Michel, E.; Ruf, R.; Dorner, H.

    1976-01-01

    Described is a nuclear power plant installation which includes a concrete biological shield forming a pit in which a reactor pressure vessel is positioned. A steam generator on the outside of the shield is connected with the pressure vessel via coolant pipe lines which extend through the shield, the coolant circulation being provided by a coolant pump which is also on the outside of the shield. To protect these components on the outside of the shield and which are of mainly or substantially cylindrical shape, semicylindrical concrete segments are interfitted around them to form complete outer cylinders which are retained against outward separation radially from the components, by rings of high tensile steel which may be interspaced so closely that they provide, in effect, an outer steel cylinder. The invention is particularly applicable to pressurized-water coolant reactor installations

  19. Nuclear power plant annunciator systems

    International Nuclear Information System (INIS)

    Rankin, W.L.

    1983-08-01

    Analyses of nuclear power plant annunciator systems have uncovered a variety of problems. Many of these problems stem from the fact that the underlying philosophy of annunciator systems have never been elucidated so as to impact the initial annunciator system design. This research determined that the basic philosophy of an annunciator system should be to minimize the potential for system and process deviations to develop into significant hazards. In order to do this the annunciator system should alert the operators to the fact that a system or process deviation exists, inform the operators as to the priority and nature of the deviation, guide the operators' initial responses to the deviation, and confirm whether operators responses corrected the deviation. Annunciator design features were analyzed to determine to what degree they helped the system meet the functional criteria, the priority for implementing specific design features, and the cost and ease of implementing specific design features

  20. Economics of hybrid photovoltaic power plants

    Energy Technology Data Exchange (ETDEWEB)

    Breyer, Christian

    2012-08-16

    The global power supply stability is faced to several severe and fundamental threats, in particular steadily increasing power demand, diminishing and degrading fossil and nuclear energy resources, very harmful greenhouse gas emissions, significant energy injustice and a structurally misbalanced ecological footprint. Photovoltaic (PV) power systems are analysed in various aspects focusing on economic and technical considerations of supplemental and substitutional power supply to the constraint conventional power system. To infer the most relevant system approach for PV power plants several solar resources available for PV systems are compared. By combining the different solar resources and respective economics, two major PV systems are identified to be very competitive in almost all regions in the world. The experience curve concept is used as a key technique for the development of scenario assumptions on economic projections for the decade of the 2010s. Main drivers for cost reductions in PV systems are learning and production growth rate, thus several relevant aspects are discussed such as research and development investments, technical PV market potential, different PV technologies and the energetic sustainability of PV. Three major market segments for PV systems are identified: off-grid PV solutions, decentralised small scale on-grid PV systems (several kWp) and large scale PV power plants (tens of MWp). Mainly by application of 'grid-parity' and 'fuel-parity' concepts per country, local market and conventional power plant basis, the global economic market potential for all major PV system segments is derived. PV power plant hybridization potential of all relevant power technologies and the global power plant structure are analyzed regarding technical, economical and geographical feasibility. Key success criteria for hybrid PV power plants are discussed and comprehensively analysed for all adequate power plant technologies, i.e. oil, gas and

  1. Dynamic Frequency Response of Wind Power Plants

    DEFF Research Database (Denmark)

    Altin, Müfit

    to maintain sustainable and reliable operation of the power system for these targets, transmission system operators (TSOs) have revised the grid code requirements. Also, the TSOs are planning the future development of the power system with various wind penetration scenarios to integrate more wind power...... according to their grid codes. In these scenarios particularly with high wind power penetration cases, conventional power plants (CPPs) such as old thermal power plants are planned to be replaced with wind power plants (WPPs). Consequently, the power system stability will be affected and the control...... capability of WPPs would be investigated. The objective of this project is to analyze and identify the power system requirements for the synchronizing power support and inertial response control of WPPs in high wind power penetration scenarios. The dynamic frequency response of WPPs is realized...

  2. Simulators predict power plant operation

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, R.

    2002-07-01

    Mix the complexity of a new construction or major retrofit project with today's 'do more with less', a pinch of 'personnel inexperience,' and a dash of 'unintended consequences', and you have got a recipe for insomnia. Advanced simulation tools, however, can help you wring out your design train your operators before the first wire is terminated and just may be get a good night's rest. The article describes several examples of uses of simulation tools. Esscor recently completed a simulation project for a major US utility exploring the potential for furnace/duct implosion that could result from adding higher volumetric flow induced-draft fans and selective catalytic reduction to a 650-MW coal-fired plant. CAF Electronics Inc. provided a full-scope simulator for Alstom's KA24-1 combined-cycle power plant in Paris, France. Computational fluid dynamics (CFD) tools are being used by the Gas Technology Institute to simulate the performance of the next generation of pulverized coal combustors. 5 figs.

  3. The Amazon Hydroelectric Dams, an Internal Geopolitical Issue in Brazil

    International Nuclear Information System (INIS)

    Broggio, Celine; Droulers, Martine; Pallamar, Juan-Pablo

    2017-01-01

    This paper develops a geopolitical analysis of dams and hydroelectric plants in the Brazilian Amazon since the mid-2000's. The implementation of these projects has provoked tensions within the federal government under the presidency of the Workers' Party and accelerated the erosion of the ideological and political platform called 'socio-environmentalism', a situation that has led to the break-up of the coalition leading to the political crisis of 2016 and the impeachment of President Dilma Rousseff. From a regional point of view, the dispute occurred in very different terms in the case of the Madeira hydroelectric power stations (Santo Antonio and Jirau in Rondonia) and in the case of the Xingu dam (Belo Monte in Para), worldwide covered by the media

  4. Stainless steels in power plant and plant construction. Papers

    International Nuclear Information System (INIS)

    1994-01-01

    The conference report comprises 14 papers on the corrosion characteristics of stainless steels in power plant and plant engineering. 9 papers are available as separate records in the ENERGY database. (MM) [de

  5. TOSHIBA CAE system for nuclear power plant

    International Nuclear Information System (INIS)

    Machiba, Hiroshi; Sasaki, Norio

    1990-01-01

    TOSHIBA aims to secure safety, increase reliability and improve efficiency through the engineering for nuclear power plant using Computer Aided Engineering (CAE). TOSHIBA CAE system for nuclear power plant consists of numbers of sub-systems which had been integrated centering around the Nuclear Power Plant Engineering Data Base (PDBMS) and covers all stage of engineering for nuclear power plant from project management, design, manufacturing, construction to operating plant service and preventive maintenance as it were 'Plant Life-Cycle CAE System'. In recent years, TOSHIBA has been devoting to extend the system for integrated intelligent CAE system with state-of-the-art computer technologies such as computer graphics and artificial intelligence. This paper shows the outline of CAE system for nuclear power plant in TOSHIBA. (author)

  6. Hydroelectricity and sustainable development

    International Nuclear Information System (INIS)

    Dubeau, D.

    1995-01-01

    From 1975 to 1992, hydroelectricity helped reduce greenhouse gas emissions in Quebec by 20%. For Hydro-Quebec, energy conservation and hydroelectric development are basic complementary tools for sustainable development. Recent studies show that developing only 50% of economically exploitable hydroelectric potential (30% of the gross theoretical potential) of different regions worldwide would considerably reduce greenhouse gas and SO 2 emissions. However, hydroelectric systems produce environmental and social impacts locally that require mitigative measures. To fulfill its mandate in a sustainable development context, Hydro-Quebec has adopted methods such as integrated resource planning, the assessment of externalities, multi criteria decision tools and public participations

  7. 76 FR 77963 - Oglethorpe Power Corporation; Proposed Biomass Power Plant

    Science.gov (United States)

    2011-12-15

    ... Service Oglethorpe Power Corporation; Proposed Biomass Power Plant AGENCY: Rural Utilities Service, USDA... related to possible financial assistance to Oglethorpe Power Corporation's (Oglethorpe) for the... online at the following Web site: http://www.rurdev.usda.gov/UWP-OglethorpePower.html and at the: Warren...

  8. Performance evaluation of cogeneration power plants

    International Nuclear Information System (INIS)

    Bacone, M.

    2001-01-01

    The free market has changed the criteria for measuring the cogeneration plant performances. Further at the technical-economic parameters, are considered other connected at the profits of the power plant [it

  9. Nuclear power plants: structure and function

    International Nuclear Information System (INIS)

    Hendrie, J.M.

    1983-01-01

    Topics discussed include: steam electric plants; BWR type reactors; PWR type reactors; thermal efficiency of light water reactors; other types of nuclear power plants; the fission process and nuclear fuel; fission products and reactor afterheat; and reactor safety

  10. Seismic detectors for nuclear power plant

    International Nuclear Information System (INIS)

    Sumida, Susumu; Matsumoto, Takuji; Gunyasu, Kenzo; Tanabe, Akira.

    1979-01-01

    Purpose: To improve the safety of a nuclear power plant by placing seismic detectors in the periphery of the nuclear power plant at the position capable of sensing the seismic waves at least 2 seconds before they arrive at the power plant, and reducing the reactor power by a scram setter upon reception of the seismic waves. Constitution: Seismic detectors are plated on a same circle around the nuclear power plant at a distance capable of detecting seismic waves before they arrive at the power plant, and they are connected to a scram setter. When the detectors detect the seismic waves, which exceeds a predetermined set value for the scram, the scram setter actuated control rod drives, by which control rods are inserted in the nuclear reactor to reduce its output power, as well as prevents external disturbances such as turbine trips. (Yoshino, Y.)

  11. Control of power plants and power systems. Proceedings

    International Nuclear Information System (INIS)

    Canales-Ruiz, R.

    1996-01-01

    The 88 papers in this volume constitute the proceedings of the International Federation of Automatic Control Symposium held in Mexico in 1995. The broad areas which they cover are: self tuning control; power plant operations; dynamic stability; fuzzy logic applications; power plants modelling; artificial intelligence applications; power plants simulation; voltage control; control of hydro electric units; state estimation; fault diagnosis and monitoring systems; system expansion and operation planning; security assessment; economic dispatch and optimal load flow; adaptive control; distribution; transient stability and preventive control; modelling and control of nuclear plant; knowledge data bases for automatic learning methods applied to power system dynamic security assessment; control of combined cycle units; power control centres. Separate abstracts have been prepared for the three papers relating to nuclear power plants. (UK)

  12. Advanced power plant materials, design and technology

    Energy Technology Data Exchange (ETDEWEB)

    Roddy, D. (ed.) [Newcastle University (United Kingdom). Sir Joseph Swan Institute

    2010-07-01

    The book is a comprehensive reference on the state of the art of gas-fired and coal-fired power plants, their major components and performance improvement options. Selected chapters are: Integrated gasification combined cycle (IGCC) power plant design and technology by Y. Zhu, and H. C. Frey; Improving thermal cycle efficiency in advanced power plants: water and steam chemistry and materials performance by B. Dooley; Advanced carbon dioxide (CO{sub 2}) gas separation membrane development for power plants by A. Basile, F. Gallucci, and P. Morrone; Advanced flue gas cleaning systems for sulphur oxides (SOx), nitrogen oxides (NOx) and mercury emissions control in power plants by S. Miller and B.G. Miller; Advanced flue gas dedusting systems and filters for ash and particulate emissions control in power plants by B.G. Miller; Advanced sensors for combustion monitoring in power plants: towards smart high-density sensor networks by M. Yu and A.K. Gupta; Advanced monitoring and process control technology for coal-fired power plants by Y. Yan; Low-rank coal properties, upgrading and utilisation for improving the fuel flexibility of advanced power plants by T. Dlouhy; Development and integration of underground coal gasification (UCG) for improving the environmental impact of advanced power plants by M. Green; Development and application of carbon dioxide (CO{sub 2}) storage for improving the environmental impact of advanced power plants by B. McPherson; and Advanced technologies for syngas and hydrogen (H{sub 2}) production from fossil-fuel feedstocks in power plants by P. Chiesa.

  13. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  14. Feasibility assessment, Lowell Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-04-01

    The results are presented of a feasibility analysis for hydroelectric generating facilities on the Merrimack River at Lowell, Massachusetts. The projected facility would utilize the existing Pawtucket Dam and a portion of the existing Northern Canal. The project was examined for economic, engineering, and environmental viability, and the results are favorable. The owners intend to proceed to the next step of negotiating a firm power purchase agreement.

  15. Nuclear Power Plants in the World

    International Nuclear Information System (INIS)

    2003-01-01

    The Japan Atomic Industrial Forum (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Nuclear power plants in the world'. In this report, some data at the end of 2002 was made up on bases of answers on questionnaires from 65 electric power companies and other nuclear organizations in 28 countries and regions around the world by JAIF. This report is comprised of 19 items, and contains generating capacity of the plants; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; status of MOX use in the world; location of the plants; the plants in the world; directory of the plants; nuclear fuel cycle facilities; and so forth. (J.P.N.)

  16. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2008-01-01

    The Japan Atomic Industrial Forum, Inc. (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Nuclear power plants in the world'. In this report, some data at the end of 2007/2008 was made up on bases of answers on questionnaires from electric power companies and other nuclear organizations around the world by JAIF. This report is comprised of 18 items, and contains generating capacity of the plants; effect of the Niigata-ken chuetsu-oki earthquake; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; status of MOX use in the world; location of the plants; the plants in the world; directory of the plants; nuclear fuel cycle facilities, and so forth. (J.P.N.)

  17. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2007-01-01

    The Japan Atomic Industrial Forum, Inc. (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Nuclear power plants in the world'. In this report, some data at the end of 2005 was made up on bases of answers on questionnaires from electric power companies and other nuclear organizations around the world by JAIF. This report is comprised of 18 items, and contains generating capacity of the plants; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; status of MOX use in the world; location of the plants; the plants in the world; directory of the plants; nuclear fuel cycle facilities, and so forth. (J.P.N.)

  18. Nuclear Power Plants in the World

    International Nuclear Information System (INIS)

    2004-01-01

    The Japan Atomic Industrial Forum, Inc. (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Nuclear power plants in the world'. In this report, some data at the end of 2003 was made up on bases of answers on questionnaires from 81 electric power companies and other nuclear organizations in 33 countries and regions around the world by JAIF. This report is comprised of 19 items, and contains generating capacity of the plants; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; status of MOX use in the world; location of the plants; the plants in the world; directory of the plants; nuclear fuel cycle facilities; and so forth. (J.P.N.)

  19. Methodology for Scaling Fusion Power Plant Availability

    International Nuclear Information System (INIS)

    Waganer, Lester M.

    2011-01-01

    Normally in the U.S. fusion power plant conceptual design studies, the development of the plant availability and the plant capital and operating costs makes the implicit assumption that the plant is a 10th of a kind fusion power plant. This is in keeping with the DOE guidelines published in the 1970s, the PNL report1, 'Fusion Reactor Design Studies - Standard Accounts for Cost Estimates. This assumption specifically defines the level of the industry and technology maturity and eliminates the need to define the necessary research and development efforts and costs to construct a one of a kind or the first of a kind power plant. It also assumes all the 'teething' problems have been solved and the plant can operate in the manner intended. The plant availability analysis assumes all maintenance actions have been refined and optimized by the operation of the prior nine or so plants. The actions are defined to be as quick and efficient as possible. This study will present a methodology to enable estimation of the availability of the one of a kind (one OAK) plant or first of a kind (1st OAK) plant. To clarify, one of the OAK facilities might be the pilot plant or the demo plant that is prototypical of the next generation power plant, but it is not a full-scale fusion power plant with all fully validated 'mature' subsystems. The first OAK facility is truly the first commercial plant of a common design that represents the next generation plant design. However, its subsystems, maintenance equipment and procedures will continue to be refined to achieve the goals for the 10th OAK power plant.

  20. Modern geothermal power: Binary cycle geothermal power plants

    Science.gov (United States)

    Tomarov, G. V.; Shipkov, A. A.

    2017-04-01

    In the second part of the review of modern geothermal power plant technologies and equipment, a role, a usage scale, and features of application of binary cycle plants in the geothermal economy are considered. Data on the use of low-boiling fluids, their impact on thermal parameters and performance of geothermal binary power units are presented. A retrospective of the use of various low-boiling fluids in industrial binary power units in the world since 1965 is shown. It is noted that the current generating capacity of binary power units running on hydrocarbons is equal to approximately 82.7% of the total installed capacity of all the binary power units in the world. At the same time over the past 5 years, the total installed capacity of geothermal binary power units in 25 countries increased by more than 50%, reaching nearly 1800 MW (hereinafter electric power is indicated), by 2015. A vast majority of the existing binary power plants recovers heat of geothermal fluid in the range of 100-200°C. Binary cycle power plants have an average unit capacity of 6.3 MW, 30.4 MW at single-flash power plants, 37.4 MW at double-flash plants, and 45.4 MW at power plants working on superheated steam. The largest binary cycle geothermal power plants (GeoPP) with an installed capacity of over 60 MW are in operation in the United States and the Philippines. In most cases, binary plants are involved in the production process together with a steam cycle. Requirements to the fluid ensuring safety, reliability, and efficiency of binary power plants using heat of geothermal fluid are determined, and differences and features of their technological processes are shown. Application of binary cycle plants in the technological process of combined GeoPPs makes it possible to recover geothermal fluid more efficiently. Features and advantages of binary cycle plants using multiple fluids, including a Kalina Cycle, are analyzed. Technical characteristics of binary cycle plants produced by various

  1. Analysis of legal obstacles and incentives to the development of low-head hydroelectric power in Maine

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maine is discussed. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined. The first step any developer of small-scale hydropower must take is to acquire right, title, or interest in the real property. In Maine, that step requires acquisition in some form of both river banks, the river bed, and where necessary, the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important, for only a use of water by a riparian owner is deemed a reasonable use and hence a legal use. A non-riparian could not draw water from a stream to increase the water level of an impoundment area on another stream. Apart from the usual methods of land acquisition involving sale, lease, or perhaps gift, Maine has two somewhat unique methods a developer may use for property acquisition. These methods, authorized by statute, are use of the abandoned dams law and use of the Mill Dam Act for flowage of upstream impoundment areas.

  2. Physical and financial virtual power plants

    International Nuclear Information System (INIS)

    Willems, Bert

    2005-01-01

    Regulators in Belgium and the Netherlands use different mechanisms to mitigate generation market power. In Belgium, antitrust authorities oblige the incumbent to sell financial Virtual Power Plants, while in the Netherlands regulators have been discussing the use of physical Virtual Power Plants. This paper uses a numerical game theoretic model to simulate the behavior of the generation firms and to compare the effects of both systems on the market power of the generators. It shows that financial Virtual Power Plants are better for society. (Author)

  3. Nuclear power plant cable materials :

    Energy Technology Data Exchange (ETDEWEB)

    Celina, Mathias C.; Gillen, Kenneth T; Lindgren, Eric Richard

    2013-05-01

    A selective literature review was conducted to assess whether currently available accelerated aging and original qualification data could be used to establish operational margins for the continued use of cable insulation and jacketing materials in nuclear power plant environments. The materials are subject to chemical and physical degradation under extended radiationthermal- oxidative conditions. Of particular interest were the circumstances under which existing aging data could be used to predict whether aged materials should pass loss of coolant accident (LOCA) performance requirements. Original LOCA qualification testing usually involved accelerated aging simulations of the 40-year expected ambient aging conditions followed by a LOCA simulation. The accelerated aging simulations were conducted under rapid accelerated aging conditions that did not account for many of the known limitations in accelerated polymer aging and therefore did not correctly simulate actual aging conditions. These highly accelerated aging conditions resulted in insulation materials with mostly inert aging processes as well as jacket materials where oxidative damage dropped quickly away from the air-exposed outside jacket surface. Therefore, for most LOCA performance predictions, testing appears to have relied upon heterogeneous aging behavior with oxidation often limited to the exterior of the cable cross-section a situation which is not comparable with the nearly homogenous oxidative aging that will occur over decades under low dose rate and low temperature plant conditions. The historical aging conditions are therefore insufficient to determine with reasonable confidence the remaining operational margins for these materials. This does not necessarily imply that the existing 40-year-old materials would fail if LOCA conditions occurred, but rather that unambiguous statements about the current aging state and anticipated LOCA performance cannot be provided based on

  4. Global analysis of a renewable micro hydro power generation plant

    Science.gov (United States)

    Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul

    2017-12-01

    Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.

  5. Nuclear Power Plants in the World

    International Nuclear Information System (INIS)

    2000-01-01

    The Japan Atomic Industrial Forum (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Developmental trends on nuclear power plants in the world'. In this report, some data at the end of 1999 was made up on bases of answers on questionnaires from 72 electric companies in 31 nations and regions in the world by JAIF. This report is comprised of 19 items, and contains generating capacity of the plants; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; location of the plants; the plants in the world; and so forth. And, it also has some survey results on the 'Liberalization of electric power markets and nuclear power generation' such as some 70% of respondents in nuclear power for future option, gas-thermal power seen as power source with most to gain from liberalization, merits on nuclear power generation (environmental considerations and supply stability), most commonly voiced concern about new plant orders in poor economy, and so forth. (G.K.)

  6. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2000-01-01

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1999 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1999; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; grid connection forecasts; world electric power market; electronuclear owners and share holders in EU, capacity and load factor; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; 1999 gross load factor by operator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  7. Nuclear Power Plant Lifetime Management Study (I)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Yull; Jeong, Ill Seok; Jang, Chang Heui; Song, Taek Ho; Song, Woo Young [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Jin, Tae Eun [Korea Power Engineering Company Consulting and Architecture Engineers, (Korea, Republic of); Kim, Woo Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-12-31

    As the operation-year of nuclear power plant increases and finding sites for new nuclear power plant becomes harder, a comprehensive and systematic nuclear plant lifetime management(PLIM) program including life extension has to be established for stable and safe supply of electricity. A feasibility study was conducted to systematically evaluate technical, economic and regulatory aspect of plant lifetime managements and plant life extension for Kori-1 nuclear power plant. For technical evaluation of nuclear power plant, 13 major components were selected for lifetime evaluation by screening system. structure, and components(SSCs) of the plant. It was found that except reactor pressure vessel, which needs detailed integrity analysis, and low pressure turbine, which is scheduled to be replaced, 11 out of 13 major components have sufficient service life, for more than 40 years. Because domestic rules and regulations related to license renewal has not yet been written, review on the regulatory aspect of life extensions was conducted using US NRC rules and regulations. A cooperative effort with nuclear regulatory body is needed for early completion of license renewal rules and regulations. For economic evaluation of plant lifetime extension, a computer program was developed and used. It was found that 10 to 20 year of extension operation of Kori-1 nuclear power plant was proved. Based on the results, next phase of plant lifetime management program for detailed lifetime evaluation and presenting detailed implementation schedule for plant refurbishment for lifetime extension should be followed. (author). 74 refs., figs.

  8. Destruction rains from power plants

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    Acid rain more acidic than lemon juice periodically falls in the U.S. east of the Mississippi River. Acid rain is the final product in a chain of reactions that begins when SO/sub 2/ is emitted from power plants. SO/sub 2/ reacts with atmospheric constituents to form sulfur trioxide, sulfate, and sulfuric acid. It is sulfate which is most harmful to human health. Nitric oxides also react in the atmosphere to form nitric acid. Coal combustion produces more than half the man-made air-borne sulfur, and half the nitrate (NOx). Auto engines produce nearly half the NOx, while catalytic convertors are a direct source of sulfuric acid. Fertilizer may also produce nitrate. As many as 21,000 people die annually from sulfur-related causes east of the Mississippi, according to a draft report by the Brookhaven National Laboratory. Acid rain has wreaked havoc in some northeastern waterways. Since 1940, it has eliminated fish from nearly half the Adirondack lakes. Acid rain also affects forest ecosystems by leaching nutrients from foliage and soil, and by killing important soil microorganisms. Antiquated buildings and sculpture are eroding. Two major obstacles for controlling acid rain and sulfates abound - bureaucratic and the National Energy Plan's commitment to coal. (MCW)

  9. Working in a virtual power plant

    International Nuclear Information System (INIS)

    Thibault, G.; Smadja, S.

    1999-01-01

    Graphical simulations on computer providing a virtual and reversible experience can now be used for maintenance in nuclear power plants allowing operations to be tested and tools to be optimised. Eventually, operatives will be trained to work in virtual nuclear power plants in complete safety. (authors)

  10. Lessons learned from existing biomass power plants

    Energy Technology Data Exchange (ETDEWEB)

    Wiltsee, G.

    2000-02-24

    This report includes summary information on 20 biomass power plants, which represent some of the leaders in the industry. In each category an effort is made to identify plants that illustrate particular points. The project experiences described capture some important lessons learned that lead in the direction of an improved biomass power industry.

  11. Preventive fire protection in nuclear power plants

    International Nuclear Information System (INIS)

    Kordina, K.; Dobbernack, R.

    1988-01-01

    Fire risk considerations in nuclear power plants and questions of preventive fire protection have so far not been dealt with sufficient attention. For this reason a research program was proposed and financed by the government of the Federal Republic of Germany in order to clarify these questions and to optimise preventive fire protection measures especially in nuclear power plants. (orig.)

  12. Quality assurance in nuclear power plant

    International Nuclear Information System (INIS)

    Magalhaes, M.T. de

    1981-01-01

    The factors related to the licensing procedures of a nuclear power plant (quality assurance and safety analysis) are presented and discussed. The consequences of inadequate attitudes towards these factors are shown and suggestions to assure the safety of nuclear power plants in Brazil are presented. (E.G.) [pt

  13. Some power uprate issues in nuclear power plants

    International Nuclear Information System (INIS)

    Tipping, Philip

    2008-01-01

    Issues and themes concerned with nuclear power plant uprating are examined. Attention is brought to the fact that many candidate nuclear power plants for uprating have anyway been operated below their rated power for a significant part of their operating life. The key issues remain safety and reliability in operation at all times, irrespective of the nuclear power plant's chronological or design age or power rating. The effects of power uprates are discussed in terms of material aspects and expected demands on the systems, structures and components. The impact on operation and maintenance methods is indicated in terms of changes to the ageing surveillance programmes. Attention is brought to the necessity checking or revising operator actions after power up-rating has been implemented

  14. The operating staff of nuclear power plants

    International Nuclear Information System (INIS)

    Schlegel, G.; Christ, W.

    1988-01-01

    The training of its staff is one of the pillars of the safe and economical operation of a power plant. This is why power plant owners began to systematically train their staff already in the 50s, and why they created central training facilities. Staff members who have undergone this training make an indispensable contribution to the acceptedly high safety and availability of German power plants. The substantial cost of creating training facilities and of schooling plant staff is considered to be an investment for the future. Low labour turnover permits careful observation and development of staff and leads to a high standard of knowledge and experience. (orig./HSCH) [de

  15. [Effect of vitamin beverages on vitamin sufficiency of the workers of Pskov Hydroelectric Power-Plant].

    Science.gov (United States)

    Spiricheva, T V; Vrezhesinskaia, O A; Beketova, N A; Pereverzeva, O G; Kosheleva, O V; Kharitonchik, L A; Kodentsova, V M; Iudina, A V; Spirichev, V B

    2010-01-01

    The research of influence of vitamin complexes in the form of a drink or kissel on vitamin sufficiency of working persons has been carried out. Long inclusion (6,5 months) in a diet of vitamin drinks containing about 80% from recommended daily consumption of vitamins, was accompanied by trustworthy improvement of vitamins C and B6 sufficiency and prevention of seasonal deterioration of beta-carotene status. As initially surveyed have been well provided with vitamins A and E, their blood serum level increase had not occurred.

  16. Dynamics of large-diameter water pipes in hydroelectric power plants

    Science.gov (United States)

    Pavić, G.; Chevillotte, F.; Heraud, J.

    2017-04-01

    An outline is made of physical behaviour of water - filled large pipes. The fluid-wall coupling, the key factor governing the pipe dynamics, is discussed in some detail. Different circumferential pipe modes and the associated cut-on frequencies are addressed from a theoretical as well as practical point of view. Major attention is paid to the breathing mode in view of its importance regarding main dynamic phenomena, such as water hammer. Selected measurement results done at EDF are presented to demonstrate how an external, non-intrusive sensor can detect pressure pulsations of the breathing mode in a pressure pipe. Differences in the pressure measurement using intrusive and non-intrusive sensors reveal the full complexity of large-diameter pipe dynamics.

  17. Economy of scale for nuclear power plants operating in hydroelectric systems - Brazilian case study

    International Nuclear Information System (INIS)

    Andrade, Gilberto

    1996-01-01

    Economy of scale is considered to enhance competitiveness of nuclear energy for electricity generation but only when high capacity factors are considered. This study shows that for the brazilian electricity generation system low capacity factors are expected and economy of scale has to be considered against the size of the Nuclear program. Units of 600 MW are competitive both for small and large Programs. (author)

  18. constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    transportation and distribution networks, electric conductors on 43% of sites are within reach of inhabitants. On 80% of sites, grounding ... the Sahara have access to electricity (Sokon and. Thomas, 1997). The economic crisis that ..... top protection for the wooden pole such as zinc belts, zinc or rubber hats and slanted top.

  19. Development in Brazil: water as an energy resource: hydroelectric power plant in Pará, Brazil.

    OpenAIRE

    Massara, Vanessa Meloni; Yoshizaki, Hugo Tsugunobu Yoshida

    2013-01-01

    Social and environmental factors have generated intense debate about sustainable development of river basins in Brazil. This paper explores the history of hydro development in the country, and investigates the advantages and disadvantages of one of the most recent developments in the Amazon basin – the Belo Monte Dam

  20. Modelling of nuclear power plant decommissioning financing.

    Science.gov (United States)

    Bemš, J; Knápek, J; Králík, T; Hejhal, M; Kubančák, J; Vašíček, J

    2015-06-01

    Costs related to the decommissioning of nuclear power plants create a significant financial burden for nuclear power plant operators. This article discusses the various methodologies employed by selected European countries for financing of the liabilities related to the nuclear power plant decommissioning. The article also presents methodology of allocation of future decommissioning costs to the running costs of nuclear power plant in the form of fee imposed on each megawatt hour generated. The application of the methodology is presented in the form of a case study on a new nuclear power plant with installed capacity 1000 MW. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.