WorldWideScience

Sample records for medium-head hydroelectric power plants

  1. Production capacity of equipment for medium and large hydroelectric power plant in China

    Energy Technology Data Exchange (ETDEWEB)

    Huang Shenyang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents an overview on the production capacity of equipment for medium and large hydroelectric power plant in China. The document approaches general aspects, production capability and testing facilities related to Francis, Kaplan, tubular and impulse hydroelectric generating sets, and the introduction of main manufacturers as well.

  2. Hydroelectric Power Plants Dobsina

    International Nuclear Information System (INIS)

    Majercak, V.; Srenkelova, Z.; Kristak, J.G.

    1997-01-01

    In this brochure the Hydroelectric Power Plants Dobsina, (VED), subsidiary of the utility Slovenske Elektrarne, a.s. (Slovak Electric, plc. Bratislava) are presented. VED is mainly aimed at generating peak-load electrical energy and maintenance of operational equipment. Reaching its goals, company is first of all focused on reliability of production, economy and effectiveness, keeping principles of work safety and industry safety standards and also ecology. VED operates eight hydroelectric power plants, from which PVE Ruzin I and PVE Dobsina I are pump storage ones and they are controlled directly by the Slovak Energy Dispatch Centre located in Zilina thought the system LS 3200. Those power plants participate in secondary regulation of electrical network of Slovakia. They are used to compensate balance in reference to foreign electrical networks and they are put into operation independently from VED. Activity of the branch is focused mainly on support of fulfilment of such an important aim as electric network regulation. Beginnings of the subsidiary Hydroelectric Power Plants Dobsina are related to the year of 1948. After commissioning of the pump storage Hydroelectric Power Plants Dobsina in 1953, the plant started to carry out its mission. Since that time the subsidiary has been enlarged by other seven power plants, through which it is fulfilling its missions nowadays. The characteristics of these hydroelectric power plants (The pump-storage power plant Dobsina, Small hydroelectric power plant Dobsina II, Small hydroelectric power plant Rakovec, Small hydroelectric power plant Svedlar, Hydroelectric power plant Domasa, The pump-storage power plant Ruzin, and Small hydroelectric power plant Krompachy) are described in detail. Employees welfare and public relations are presented

  3. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  4. Hydroelectric power and hydroelectric power plants. V. 1

    International Nuclear Information System (INIS)

    1991-06-01

    Following the oil crises of 1973 and 1979, there was renewed and justifiable interest in small hydroelectric plants. The maximum power of these plants rarely exceeds 10 MW, and their development will surely increase in the coming decades. Hydraulic power is a national renewable resource, unaffected by geopolitical problems, and above all, non polluting. Many countries with their own hydraulic resources in both the industrialized and the developing world have expressed needs for the development of small hydroelectric plants. Hidroenergia 91 Conference is the opportunity to take stock of knowledge gained in the vast field of small hydroelectric plants. The meeting is divided into four subjects: 1 methods for decision aid; 2 environmental impact and accompanying answers; 3 national development policy; 4 world market and international cooperation. This meeting contains 75 papers, 8 papers are in the INIS scope and 72 papers are in the ENERGY DATA BASE scope

  5. Amplification of Marzagao small scale hydroelectric power plant; Ampliacao da PCH de Marzagao

    Energy Technology Data Exchange (ETDEWEB)

    Zeller, A.R.; Porto, D.S.; Pinto, F.S. [Leme Engenharia, MG (Brazil); Melo, A.U.; Almeida, A.M.; Pereira, D.R. [Fertiligas Industria e Comercio Ltda., MG (Brazil)

    1991-12-31

    This work presents the modernization and power augmentation of Marzagao small scale hydroelectric power plant. In order that the costs of the project be compatible to the total of investments in the project, it was necessary the adoption of methodologies and time scales different from those used for large and medium scale hydroelectric power plants 5 figs.

  6. Small hydroelectric power plants

    International Nuclear Information System (INIS)

    Helgesen, Boerre

    2002-01-01

    Small hydroelectric power plants are power plants of 1 - 10 MW. For a supplier, this is an unnatural limit. A more natural limit involves compact engine design and simplified control system. The article discusses most of the engine and electrotechnical aspects in the development, construction and operation of such a plant

  7. The greatest hydroelectric power plant in the world. Itaipu Hydroelectric Power Plant

    International Nuclear Information System (INIS)

    Andonov - Chento, Ilija

    2004-01-01

    Details to demonstrate the size and engineering achievements of one of the world's greatest hydroelectric power plant are given. Principal technical features of construction and operation of the Itaipu Dam are tabulated and discussed

  8. Competitive analysis of small hydroelectric power plants

    International Nuclear Information System (INIS)

    Assad, L.S.; Placido, R.

    1990-01-01

    The agreement between CPFL/UNICAMP/EFEI for developing energetic planning of Small Hydroelectric Power Plants construction is described. Some notions for showing the more economic alternative between decide by Small Hydroelectric Power Plants construction and continue supply the market by inter ligated system generation are shown in this stage of the agreement. (author)

  9. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  10. Hydroelectric power plants may influence profit of company

    International Nuclear Information System (INIS)

    Regula, E.

    2006-01-01

    In this interview with divisional manager of the Division of control of operation of hydroelectric power plants of the Slovenske elektrarne, a.s. Mr. Milan Chudy is published. The effectiveness and its optimisation in hydroelectric power plants of the Slovenske elektrarne, a.s. are discussed

  11. Risks in the operation of hydroelectric power plants and nuclear power in Brazil

    International Nuclear Information System (INIS)

    Goldemberg, J.

    1986-01-01

    A comparison between the utilization of electrical energy generated by hydroelectric power plant and nuclear power plant is made. The risks from nuclear installations and the environmental effects of hydroelectric power plants and nuclear power plants are presented. (E.G.) [pt

  12. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power... BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of...

  13. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  14. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  15. Production costs: U.S. hydroelectric power plants, 4th Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The book provides 1991 operation and maintenance expenses for over 800 conventional and pumped-storage hydroelectric power plants. Report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, O ampersand M expenses, total production costs and current plant capitalization. Fifty eight percent of the utility-owned hydroelectric plants in the US are covered by this report. Data diskette provides additional capital and production cost accounts and number of employees for each plant

  16. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  17. Using fire dynamics simulator to reconstruct a hydroelectric power plant fire accident.

    Science.gov (United States)

    Chi, Jen-Hao; Wu, Sheng-Hung; Shu, Chi-Min

    2011-11-01

    The location of the hydroelectric power plant poses a high risk to occupants seeking to escape in a fire accident. Calculating the heat release rate of transformer oil as 11.5 MW/m(2), the fire at the Taiwan Dajia-River hydroelectric power plant was reconstructed using the fire dynamics simulator (FDS). The variations at the escape route of the fire hazard factors temperature, radiant heat, carbon monoxide, and oxygen were collected during the simulation to verify the causes of the serious casualties resulting from the fire. The simulated safe escape time when taking temperature changes into account is about 236 sec, 155 sec for radiant heat changes, 260 sec for carbon monoxide changes, and 235-248 sec for oxygen changes. These escape times are far less than the actual escape time of 302 sec. The simulation thus demonstrated the urgent need to improve escape options for people escaping a hydroelectric power plant fire. © 2011 American Academy of Forensic Sciences.

  18. Measurents of natural radioactivity in an underground hydroelectric power plant

    International Nuclear Information System (INIS)

    Malvicini, Andrea; Esposito, PierLuigi; Depiesse, Danielle

    2008-01-01

    In underground working places, especially when ventilation is not properly regulated, large amounts of natural radioactivity can be found. This can give rise to potential exposures of non-negligible magnitude. Direct measurements of gamma radiation and radon were carried out during excavation works for the construction of an hydroelectric plant in the north of Italy. After the construction of the plant, in order to reduce radon concentrations and to improve ventilation effectiveness, the main entry gate was motorized and automated. Then, in order to find the optimal speed for the fans located in the galleries and in the power plant, radon and airflow velocity were measured. Correlation data between airflow and radon concentrations were found. An automatic regulation system has been set up using air velocity detectors and slightly modifying the software for the control and regulation of the power plant. Measurements must be made in order to identify radon sources and evaluate quantitative contributions as a function of ventilation. Underground hydroelectric plants are provided with entry galleries as well as secondary galleries from which radon coming out from the soil and the walls can exhale in quantities that depend on the contents of 226 Ra in the rocks and in the building materials. Other radon sources are the water coming out from the walls of the galleries and the water in the deep well located at the bottom of the power plant. Geological studies and mathematical models are useful means for the analysis of the relative contributions of the main sources as well as for the prediction of the effects deriving from modifications of the hydroelectric plant ventilation system or resulting from other important structural changes. (author)

  19. New erection program of the hydroelectric power plant Beznau. Das Neubauprojekt des hydraulischen Kraftwerkes Beznau

    Energy Technology Data Exchange (ETDEWEB)

    Bretscher, B; Hauenstein, W [NOK Nordostschweizerische Kraftwerke AG, Baden (Switzerland)

    1992-02-21

    The projected hydroelectric power plant at Beznau on the Aare river will produce about 43% more electric power than the present hydroelectric power plant. The water level and the buildings in the Aare will remain unchanged, so that the enviromental impact will be relativley slight. The project is in accordance with the building permit so that no adaptations on modifications will be required. (orig.).

  20. Environmental requirements at hydroelectric power plants

    International Nuclear Information System (INIS)

    Cada, G.F.

    1993-01-01

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour

  1. Ecological impact from large constructions of hydroelectric power plants in Parana River, Brazil

    International Nuclear Information System (INIS)

    Bonetto, Argentino A.

    1992-01-01

    An analysis over environmental impacts on Parana River as a result of the hydroelectric power plants construction is presented. Hydroelectric dams, also including the planned ones, are showing during the explanation, and biologic aspects are discussed. 30 refs., 4 figs., 2 tabs

  2. A contribution to the methods of determining the optimal exploitation of hydraulically related hydroelectric power plants of different owners

    International Nuclear Information System (INIS)

    Gievski, Igor

    2013-01-01

    For the purpose of solving the water-supply and energy-related problems of the city of Skopje, the need has arisen to construct the 'Skopsko Pole' hydro system. The 'Skopsko Pole' hydro system consists of the power plants 'Kozjak', 'SvetaPetka' and 'Matka'. It is envisioned to use the watercourse of the Treska River and has been envisaged as a multipurpose system, that is, as an anti-flood system, system for irrigation of agricultural land and an electricity producer. Certainly, the meeting of the aforementioned needs will depend on the hydrological potential of the Treska River, which is why an exact and detailed review of the hydrological potential of the Treska River is of vital importance. It is a complex task to determine the optimal work of the hydroelectric power plants built along the same river, even if this is about the so-called run-of-the-water hydroelectric power plants, given the different interests of the water consumers of the same watercourse. This problem will become more complicated if one or more (that is, all) hydroelectric power plants have their own accumulative pools. In this case, the question arises of how the waters of each of the accumulations should be used. During this, we need to bear in mind the fact that every release of water from each of the accumulations alters the elevation points of all the hydroelectric power plants on the same watercourse and thus affects their production and eventually the benefit of their work. With the restructuring of the electric energy systems in different countries over the past 20 years, the vertically integrated power plants have been converted into horizontally integrated ones. In many cases, it is different companies that are the electricity producers, the high-voltage electricity transmitters, and the medium- and low-voltage electricity distributors. Some of these companies are private companies, whereas others are state-owned. Such diverse ownership of the power plants, which are by default

  3. The hydroelectric power market in the world

    International Nuclear Information System (INIS)

    Junius, A.

    2004-10-01

    This work makes a synthesis of the hydroelectric power market, of its present day capacity in the world, and of its perspectives of development in the future. The first part treats of the hydroelectric facilities and of the market of hydroelectric power plants. It presents the technology used and the different types of plants, the evolution of their geographical setting and the future potentialities of development. The second part deals with the competitiveness of this industry with respect to: the energy policy stakes, the profitability, the energy independence of countries, the regulation of power networks and the environmental impacts. (J.S.)

  4. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  5. Hydroelectric power stations and ecological energy policy

    International Nuclear Information System (INIS)

    Novakova, R.

    1993-01-01

    The report discusses the place of hydroenergy in solving the power and ecological problems of Bulgaria: level of building up of the hydroelectric capacity of the country; possibilities for new hydro electric construction; environmental problems of design, construction and operation of the hydroelectric units; advantages of the hydroelectric engineering. The possibilities of the hydroelectric power plants as an alternative of the other more or less conventional electicity producers are shown in order to help in decision making as regards the problems of the economic, power and environmental crisis. (author)

  6. Micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to characterise the state of ten Micro Hydroelectric Power Plants (MHPPs) installed in the west region of Cameroon, in preparation for their modernization. The work was carried out between January 2006 and December 2008. Each site was visited at least once a month. During these ...

  7. Constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to study the constraints of Micro Hydroelectric Power Plants (MHPPs) installed in the West Region of Cameroon. The study was carried out between January 2005 and December 2008 and is related to water conveyance structures, production facilities; transportation and distribution ...

  8. Access to realization of small hydroelectric power station in Republic of Macedonia

    International Nuclear Information System (INIS)

    Jakimova Filipovska, Nevenka

    2001-01-01

    In the paper an overview of the small-scale hydroelectric power plants is presented. The categorization groups of small to micro hydroelectric power plants by different countries are given. Also, the evaluation models of the projects for realization the small hydroelectric power plants are analysed. The aim of the paper is to stress the advantages of the small hydro projects and their implementation in Macedonia

  9. Fish passage hydroelectric power plant Linne, Netherlands. Didson measurements

    International Nuclear Information System (INIS)

    Van Keeken, O.A.; Griffioen, A.B.

    2011-11-01

    The hydroelectric power plant in the Dutch Maas River near Linne has a fish deflection and passage system. For this study, two evenings in the months of August and September 2011 were dedicated to examining the extent to which fish approached and used the fish passage system. To establish the swimming behavior of the fish, a high-resolution sonar (DIDSON) was used, which generates moving images of fish in turbid waters, to study their behavior. [nl

  10. Monitoring of surge tanks in hydroelectric power plants using fuzzy control; Ueberwachung von Wasserschloessern in Wasserkraftwerken mit Fuzzy-Control

    Energy Technology Data Exchange (ETDEWEB)

    Lin, J.C.

    2000-07-01

    Surge tanks are used to reduce pressure variations caused by fluid transients in high-head hydroelectric power plants. Occasionally load increases have to be limited to prevent the surge tank from draining due to excessive demands of flow. A control concept based on fuzzy logic was developed for governing the load changes of hydroelectric power plants. In order to achieve an optimal control behaviour and simultaneously to avoid the draining of surge tanks, the speed of load increases is automatically adjusted by a fuzzy conclusion depending on the height and the gradient of the water level in the surge tank, the reservoir level and the sum of load increases. The hydroelectric power plant Achensee of Tiroler Wasserkraftwerke AG in Austria is taken as an example to demonstrate the characteristics of the control concept. In comparison with a conventional control concept, the operation of load increases using the fuzzy concept proves to be more flexible and unrestricted. (orig.) [German] Ein Wasserschloss dient zur Verminderung von Druckschwankungen im Wasserfuehrungssystem von Hochdruckanlagen. Gelegentlich muss man die Lastaufnahme so beschraenken, dass das Wasserschloss nicht durch uebermaessige Wasserentnahme leerlaeuft. Fuer die Leistungsregelung eines Wasserkraftwerks wurde ein Konzept entwickelt, das auf der Fuzzy-Control in Verbindung mit der klassischen Regelung beruht. Um ein optimales Regelverhalten zu erhalten und gleichzeitig das Leerlaufen des Wasserschlosses zu vermeiden, wird die Geschwindigkeit der Lastaufnahme in Abhaengigkeit von der Hoehenkote und dem Gradienten des Wasserschlosspegels, dem Pegel des Oberwassers und der Groesse der geforderten Lasterhoehung automatisch eingestellt. Die Untersuchung erfolgt am Beispiel des Achenseekraftwerkes der Tiroler Wasserkraftwerke AG, Oesterreich. Im Vergleich mit einer konventionellen Regelung ergibt sich mit dem Fuzzy-Konzept eine flexiblere und freizuegigere Lastaufnahme. (orig.)

  11. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  12. Design of an Adaptive Power Regulation Mechanism and a Nozzle for a Hydroelectric Power Plant Turbine Test Rig

    Science.gov (United States)

    Mert, Burak; Aytac, Zeynep; Tascioglu, Yigit; Celebioglu, Kutay; Aradag, Selin; ETU Hydro Research Center Team

    2014-11-01

    This study deals with the design of a power regulation mechanism for a Hydroelectric Power Plant (HEPP) model turbine test system which is designed to test Francis type hydroturbines up to 2 MW power with varying head and flow(discharge) values. Unlike the tailor made regulation mechanisms of full-sized, functional HEPPs; the design for the test system must be easily adapted to various turbines that are to be tested. In order to achieve this adaptability, a dynamic simulation model is constructed in MATLAB/Simulink SimMechanics. This model acquires geometric data and hydraulic loading data of the regulation system from Autodesk Inventor CAD models and Computational Fluid Dynamics (CFD) analysis respectively. The dynamic model is explained and case studies of two different HEPPs are performed for validation. CFD aided design of the turbine guide vanes, which is used as input for the dynamic model, is also presented. This research is financially supported by Turkish Ministry of Development.

  13. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  14. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  15. Small-scale hydroelectric power plant of Passo do Inferno automation system; Sistema de automatizacao da PCH Passo do Inferno

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Luiz C. Lisboa; Moralles, Reni; Quadros, Carlos A.D.; Martiny, Raul; Moehlecke, Juarez E.; Costa, Nelson D. da; Cesar, Rogerio L.; Santos, Sergio S.; Basei, Eleu Natal [Companhia Estadual de Energia Eletrica do Estado do Rio Grande do Sul, Porto Alegre, RS (Brazil)

    1993-12-31

    This work introduces the automation system brought into the 1,7 MVA small-scale hydroelectric power plant of Passo do Inferno, state of Rio Grande do Sul, Brazil. The following systems are presented: supervision, security and generation control, as well as the program and the controller. In this work, it is focused the generation control system, as a new outfitted system in small-scale hydroelectric power plants 3 figs.

  16. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Science.gov (United States)

    Che Munaaim, M. A.; Razali, N.; Ayob, A.; Hamidin, N.; Othuman Mydin, M. A.

    2018-03-01

    A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP). This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW) and fall beyond of the range of a micro hydro power (5kW - 100kW) since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy) especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing water to make

  17. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Directory of Open Access Journals (Sweden)

    Che Munaaim M.A.

    2018-01-01

    Full Text Available A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP. This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW and fall beyond of the range of a micro hydro power (5kW - 100kW since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing

  18. An Investigation of Health and Safety Measures in a Hydroelectric Power Plant

    Directory of Open Access Journals (Sweden)

    Amevi Acakpovi

    2016-12-01

    Conclusion: The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.

  19. Hydroelectric power plant Irape - viability studies; Usina hidroeletrica Irape - estudos de viabilidade

    Energy Technology Data Exchange (ETDEWEB)

    Serran, F.P.; Assumpcao, M.G.

    1994-06-01

    The socio-environmental analysis of the feasibility studies from Irape Hydroelectric Power Plant in Minas Gerais State-Brazil was described including three main questions: the regional insertion mentioning the social conflicts, the social communication program and the basic strategic; the reduction of water volume downstream; the development of programs on the Basic Project Stage.

  20. Hydroelectric power and privatisation

    International Nuclear Information System (INIS)

    Frankovic, B.

    2000-01-01

    The paper considers privatisation aspects of both the existing hydroelectric power plants presently owned by the Croatian state and those to be built in the future. The paper highlights the water power utilisation as just one of the possible purposes of water and land resources development, which are the most important segment of the physical development of the Croatian territory, and the fact that water and land are public wealth. (author)

  1. Herpetofauna, Espora Hydroelectric Power Plant, state of Goiás, Brazil.

    Directory of Open Access Journals (Sweden)

    Vaz-Silva, W.

    2007-01-01

    Full Text Available We provide a checklist of the herpetofaunal assemblage from Espora Hydroelectric Power Plant region(UHE Espora, southwestern of the state of Goiás, Brazil. Representatives of 32 amphibian and 71 reptile species wereobtained during faunal monitoring and faunal rescue programs carried out in the study area. The obtained species listand distribution records are here discussed in an attempt to improve the still limited knowledge on Cerradoherpetofaunal assemblages.

  2. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  3. Assessment and statistics of Brazilian hydroelectric power plants: Dam areas versus installed and firm power

    International Nuclear Information System (INIS)

    Caetano de Souza, Antonio Carlos

    2008-01-01

    The Brazilian relief, predominantly composed by small mountains and plateaus, contributed to formation of rivers with high amount of falls. With exception to North-eastern Brazil, the climate of this country are rainy, which contributes to maintain water flows high. These elements are essential to a high hydroelectric potential, contributing to the choice of hydroelectric power plants as the main technology of electricity generation in Brazil. Though this is a renewable source, whose utilized resource is free, dams must to be established which generates a high environmental and social impact. The objective of this study is to evaluate the impact caused by these dams through the use of environmental indexes. These indexes are ratio formed by installed power with dam area of a hydro power plant, and ratio formed by firm power with this dam area. In this study, the greatest media values were found in South, Southeast, and Northeast regions respectively, and the smallest media values were found in North and Mid-West regions, respectively. The greatest encountered media indexes were also found in dams established in the 1950s. In the last six decades, the smallest indexes were registered by dams established in the 1980s. These indexes could be utilized as important instruments for environmental impact assessments, and could enable a dam to be established that depletes an ecosystem as less as possible. (author)

  4. Project final report: Energetic planning focusing small scale hydroelectric power plants; Relatorio final. Projeto planejamento energetico com enfase em pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Yara dos Santos

    1994-12-31

    Considering the increasing need for a better utilization of the Brazilian hydric resources, a deeper analysis of small scale hydroelectric power plants has been demanding. This work presents a case study of energetic planning based upon small scale hydroelectric power plants in a district of Amazon state - North Brazil 8 refs., 11 figs., 19 tabs.

  5. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  6. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  7. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  8. Present status and perspectives for hydroelectric power in world

    International Nuclear Information System (INIS)

    Malquori, E.

    1991-01-01

    In the note a review of the present status and perspectives of hydroelectric power in the world is introduced. The present status regards, in chronological order, the last decade, as to say the works carried out in the 80ies whereas the perspectives regard the next twenty years as to say until 2010. The mentioned electric power potentiality refers to pure generation plants of great, middle and small size and to what could be achieved by already existing plants after changes and/or replacements and improvement of the machinery. Beside the figures regarding powers, great generation and pumping plants whose contribution has been and will be remarkable have been properly mentioned. The Italian contribution - civil works design, construction, and machinery supply - in the last hydroelectric development is briefly mentioned with particular reference to the developing countries

  9. Power improvement and modernization of small scale hydroelectric power plants in Brazil; Recapacitacao e modernizacao de PCH`s no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Nascimento, Jose Guilherme Antioga do [Departamento Nacional de Aguas e Energia Eletrica (DNAEE), Brasilia, DF (Brazil); Amaral, Cristiano Abijaode [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1995-12-31

    Several small scale hydroelectric power plants existing in Brazil have been abandoned due to recent projects of large scale units, however, some of than still present workable conditions. Due to that fact, several Brazilian electric power companies have been considering the possibility of modernizing such old units as an alternative for regional electric power generation. This work discusses the above mentioned issues 3 refs., 5 figs., 9 tabs.

  10. Pollution and power generation: environmental implications Small Hydroelectric Plants of Sao Paulo

    Directory of Open Access Journals (Sweden)

    Giorgia Limnios

    2015-06-01

    Full Text Available The current situation of water scarcity of of São Paulo State, manifested as imminent risk of shortages in major urban areas, has led not only to issues concerning preservation of water resources, but also problems related to energy availability, identified in a series of expeditions field carried out under the project " Electricity History of the State of Sao Paulo (1890-1960: Industrial Heritage , Landscape and Environment – Electromemory II”. The objective of this project is to study an extremely representative set of power plants and small hydroelectric power plants built during the initial period of electrification of the State of São Paulo – Brazil (1890-1960, along with its evolution within the social, historical and geographical aspects, to highlight the landscape changes resulting from the electrification process, as well as beneficiaries and impacts on landscape during the study period. In all visits, in addition to the problem of water scarcity, we verified that the power plants face generation constraints related to severe water pollution, either by diffuse or point sources. Some studies conducted in Brazil have analyzed the interference of pollution in power generation , highlighting the role of diffuse sources such as solid waste, sediments from areas with strong erosion, lubricant oils from vehicles or the development of invasive species, particularly as macrophytes, causative agents of biochemical changes that promote the formation of chemical compounds able to erode the electromechanical equipment of the plants or even prevent the flow of water intake into the same. The power plants covered by Electromemory II Project scope have these same problems, which prompted the need to establish a relationship between pollution in its various forms and the generation of electricity. To establish this bridge, the survey of publications and technical reports was necessary as well asresearches inenvironmental legislation

  11. Influence of the Amazon Hydrological Regime on Eutrophication Indicators of a Hydroelectric Power Plant Reservoir.

    Science.gov (United States)

    Freire, Jean Carlos A; Hauser-Davis, Rachel Ann; da Costa Lobato, Tarcísio; de Morais, Jefferson M; de Oliveira, Terezinha F; F Saraiva, Augusto Cesar

    2017-05-01

    Dam constructions in the Amazon have increased exponentially in the last decades, causing several environmental impacts and serious anthropogenic impacts in certain hydroelectric power plant reservoirs in the region have been identified. The assessment of the trophic status of these reservoirs is of interest to indicate man-made changes in the environment, but must take into account the hydrological cycle of the area. This can be relevant for environmental management actions, aiding in the identification of the ecological status of water bodies. In this context, physico-chemical parameters and eutrophication indicators were determined in a hydroelectric power plant reservoir in the Brazilian Amazon to assess trophic variations during the regional hydrological regime phases on the reservoir, namely dry, filling, full and emptying stages. The local hydrological regimes were shown to significantly influence TSS and turbidity, as well as NH 4 , NO 3 , PO 4 , with higher values consistently observed during the filling stage of the reservoir. In addition, differences among the sampling stations regarding land use, population and anthropogenic activities were reflected in the PO 4 3- values during the different hydrological phases.

  12. Environmental study of the Wairakei Power Plant. [Effects of hydroelectric power plant on ecology of Waikato River Basin, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Axtmann, R C

    1974-12-01

    Physical, chemical, biological, ecological, and aesthetic aspects of the Wairakei Power Plant are examined, in varying detail, but with primary emphasis on the chemical and thermal effluents. When flows are average or higher in the Waikato River, the Plant's environmental effects are not overly severe. However, operating requirements for the Waikato Hydro-electric System are such that the Plant sporadically produces wastes that may affect the human and natural environment adversely. These adverse effects are not presently too serious, but suggestions are made for improving the Plant's overall environmental performance. Although the point is not discussed in detail, it is clear from the results of the study that any additional thermal plants on the Waikato could strain the river's absorptive capacities severely, unless alternative disposal techniques are used for the various effluents.

  13. Operator training for the Yacyreta binational hydroelectric power plant; Formacion de operadores para la Central Hidroelectrica de Yacireta

    Energy Technology Data Exchange (ETDEWEB)

    Dure, Francisco; Tachella, Heriberto [Entidad Binacional Yacyreta, Isla Yacireta (Paraguay). Central Hidroelectrica Yacyreta]. E-mail: yacyreta@internet.siscotel.com

    1998-07-01

    This work is oriented to the power plant operators, by exposing the criteria and methods adopted for operators selection, training and incorporation to the Yacyreta Hydroelectric Power Plant. The used criteria considered some aspects, as follows: the operation staff should be consisted of equal numbers of Argentine and Paraguayan nationalities, viewing the both systems operation; experience of the shift supervisors in operating a plant for a minimum of 10 years; the supervisors should participate training the auxiliary operators.

  14. Inventory studies of hydroelectric power plants: the methodological differences for small and large power plants; Estudos de inventario de usinas hidreletricas: as diferencas metodologicas para pequenas e grandes centrais

    Energy Technology Data Exchange (ETDEWEB)

    Bajay, Sergio Valdir [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Energia; Martinez, Carlos Barreira [Faculdade de Engenharia Civil de Itajuba, MG (Brazil)

    1992-12-31

    The hydroelectric potential handbook produced by ELETROBRAS provides procedures to guides the hydro power studies of river sites. In this paper, a critical analysis of these procedures is carried out, for both large and small hydro power plants, pin pointing the plant`s planning/design interface there, several proposals are put forward in the order to adapt these procedures to small hydro plants, optimizing their planning and design for the several situation, found in Brazilian reality. (author) 5 refs.

  15. Hydroelectric power in Romania. Past - present - future

    International Nuclear Information System (INIS)

    Bogan, V.

    1996-01-01

    This paper presents an analysis of the past and present situation in hydroelectric power (achievements, rates of commissioning and so on) and the future strategies for the hydroelectric power resource development in the conditions of a free market economy. At present the contribution of hydroelectric power in the Romania's total power balance is about 16,500 GW h/year which represents nearly 28 %. The theoretical hydroelectric power potential of Romania is 75,000 GW h/year while the technical potential, which could actually be developed, is only 40,000 GW h/year. Finally, there are presented the main directions in the hydroelectric power development up to the year 2020. (author) 3 tabs

  16. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    Science.gov (United States)

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  17. An Investigation of Health and Safety Measures in a Hydroelectric Power Plant.

    Science.gov (United States)

    Acakpovi, Amevi; Dzamikumah, Lucky

    2016-12-01

    Occupational risk management is known as a catalyst in generating superior returns for all stakeholders on a sustainable basis. A number of companies in Ghana implemented health and safety measures adopted from international companies to ensure the safety of their employees. However, there exist great threats to employees' safety in these companies. The purpose of this paper is to investigate the level of compliance of Occupational Health and Safety management systems and standards set by international and local legislation in power producing companies in Ghana. The methodology is conducted by administering questionnaires and in-depth interviews as measuring instruments. A random sampling technique was applied to 60 respondents; only 50 respondents returned their responses. The questionnaire was developed from a literature review and contained questions and items relevant to the initial research problem. A factor analysis was also carried out to investigate the influence of some variables on safety in general. Results showed that the significant factors that influence the safety of employees at the hydroelectric power plant stations are: lack of training and supervision, non-observance of safe work procedures, lack of management commitment, and lack of periodical check on machine operations. The study pointed out the safety loopholes and therefore helped improve the health and safety measures of employees in the selected company by providing effective recommendations. The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.

  18. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  19. Improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    By principle, hydroelectric power generation relies on the law of conservation of energy where kinetic energy that resulted from the movement of the mass of water from the river is translated into electr icity, the quantum of which depends on systemic variables viz: plant efficiency, volumetric water flow through the turbine and ...

  20. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  1. Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' hydroelectric system into the power system of the Republic of Macedonia

    International Nuclear Information System (INIS)

    Rumenova, Evica; Naumoski, Kliment

    2001-01-01

    At the and of 1998, a study on conditions and possibilities of the 'Shara' hydroelectric system construction was prepared. The study considers an interesting idea for building up three reversible power plants. From electricity point of view the study emphasizes several significant issues that require comprehensive analyses in order to define the conditions and possibilities for their development. This paper attempts to give an overview of one of this issues: Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' - system into the power supply system of Republic of Macedonia. (Original)

  2. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  3. Small and medium-sized nuclear power plants

    International Nuclear Information System (INIS)

    Schmidt, R.

    1986-01-01

    Small and medium-sized nuclear power plants have long been under discussion as possible applications of nuclear power in countries with small transmission grid systems, in threshold countries and developing countries, and under special local supply conditions. IAEA has condensed and promoted this interest and tried to establish the demand, and possibilities of meeting it, in special events and campaigns. In recent years, considerable interest was registered even in industrialized countries, but here specially for heating and process heat generation applications and for special purposes and, in medium-sized units, also for combined supplies of electricity and heat. This corresponds to special reactor and plant concepts, some of which have already been developed to a stage at which construction work could begin. The analysis presented deals with necessary preconditions on the sides of the users and the vendors, with problems of economy, infrastructure and financing and with the market prospects of small nuclear power plants. (orig./HP) [de

  4. Environmental Impact Report from Santa Rita Hydroelectric Power Plant (Minas Gerais State - Brazil): technical strategic for its elaboration

    International Nuclear Information System (INIS)

    Souza, J.A. de; Marques Neto, F.P.

    1989-01-01

    The steps for developing the technical strategies used on the elaboration of Environmental Impact Report from Santa Rita Hydroelectric Power Plant, Minas Gerais State, are described, including the influence area, technical requirements, impact identification, technical selection of mitigative measures, impact meaning and strategy for evaluating the identified impacts. (C.G.C.)

  5. Attracting finance for hydroelectric power

    International Nuclear Information System (INIS)

    Besant-Jones, John

    1996-01-01

    Hydroelectricity will continue to be important for meeting power requirements in developing countries. Much of the funding required for hydroelectric projects must come from non-government source; hydroelectric projects will therefore need to be attractive to private investors. This note explores the risks investors face, how this can be mitigated, and how the World Bank group can offer advice (as well as finance) to member countries to facilitate investment in hydro electric projects. 3 refs., 1 fig

  6. Estimation of small-scale hydroelectric power plant costs

    International Nuclear Information System (INIS)

    Santos, Afonso Henriques Moreira; Silva, Benedito Claudio da; Magalhaes, Ricardo Nogueira

    2010-01-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  7. Greenhouse gas emissions from hydroelectric reservoirs

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.

    1994-01-01

    In a recent paper, Rudd et al. have suggested that, per unit of electrical energy produced, greenhouse-gas emissions from some hydroelectric reservoirs in northern Canada may be comparable to emissions from fossil-fuelled power plants. The purpose of this comment is to elaborate these issues further so as to understand the potential contribution of hydroelectric reservoirs to the greenhouse effect. More than focusing on the total budget of carbon emissions (be they in the form of CH 4 or be they in the form of CO 2 ), this requires an evaluation of the accumulated greenhouse effect of gas emissions from hydroelectric reservoirs and fossil-fuelled power plants. Two issues will be considered: (a) global warming potential (GWP) for CH 4 ; and (b) how greenhouse-gas emissions from hydroelectric power plants stand against emissions from fossil-fuelled power plants with respect to global warming

  8. Comparative studies between nuclear power plants and hydroelectric power plants

    International Nuclear Information System (INIS)

    Menegassi, J.

    1984-01-01

    This paper shows the quantitative evolution of the power plants in the main countries of the world. The Brazilian situation is analysed, with emphasys in the technical and economical aspects related to power production by hidroelectric or nuclear power plants. The conclusion is that the electricity produced by hidro power plants becomes not economics when is intended to be produced at large distances from the demand centers. (Author) [pt

  9. Medium-size power plants. Economic options

    International Nuclear Information System (INIS)

    Vogelweith, L.; Baujat, J.; Goutail, J.

    1978-01-01

    In this paper the authors describe a method for economic evaluation of a nuclear power plant project such as advocated by the IAEA but modified through the introduction of various parameters that may affect the evaluation, i.e. the weighted evaluation rate, the annual increase in the cost of fuel, and the discount rate. The method is applied to barge-based medium-size reactors (125 MW(e)). The authors calculate the investment cost, together with the costs of administration, operation and maintenance; use is made of current assumptions regarding the price of fuel for the case of a reference nuclear plant and an oil-fired plant of the same power and in the same programme. In this way the authors derive the discounted cost of the nuclear programme and concurrent conventional programme on the basis of the following assumptions: a weighted inflation rate varying between 0 and 6% per year; an annual increase in real fuel prices ranging from 0 to 3%; and a real discount rate, equal to the real interest rate, varying between 4 and 7% per year and corresponding to nominal discount rates of up to 13.4%. The conclusion reached is that, given the real interest rates actually prevailing on the financial market, a weighted inflation rate foreseen by the majority of experts, and a rise in real fuel prices of the order of 1% per year, the medium-size nuclear power plant is more economical than a conventional plant of the same output. (author)

  10. The role of hydroelectric power in energy economy

    International Nuclear Information System (INIS)

    Allet, B.

    1989-01-01

    The state of development and the technical potential of hydroelectric power worldwide, in Europe and in Switzerland are briefly compared with each other. Afterwards, the most important types of hydroelectric power stations and their function in the electricity-distribution network, are put forward. The realistic possibilities of development in Switzerland, up to the year 2025, of each type of hydroelectric power station is judged with regard to the currently valid regulations. The effects of the peoples' initiative - 'towards the salvation of our waters' or for stricter regulations for the protection of water - on the chances of realisation of these possibilities of development are shown. The forseeable decrease in the production of energy by the existing hydroelectric power stations, as a result of the regulation planned for rest water, is judged. Various forecasts for the future quantity of hydroelectric power production in Switzerland are put forward. 6 figs., 7 tabs., 12 refs

  11. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  12. Economic performance of small scale hydroelectric power plants: `Results center`; Desempenho economico de PCH`s: centro de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Cipoli, Jose Adolfo; Silva, Jose Paulo Mendes [Companhia Paulista de Forca e Luz (CPFL), Campinas, SP (Brazil)

    1995-12-31

    This work presents the experience concerning the creation of an imaginary company named `CPFL Generator`, composed by 20 small scale hydroelectric power plants. The main idea of the project is to analyse the economic performance of each unit individually and the group as a company, enabling to a better quality management 3 refs., 1 fig., 7 tabs.

  13. Synanthropy of mosquitoes and sand flies near the Aimorés hydroelectric power plant, Brazil.

    Science.gov (United States)

    Barata, R A; Ursine, R L; Nunes, F P; Morais, D H; Araújo, H S

    2012-12-01

    The environmental changes resulting from the construction of hydroelectric dams may affect the fauna of insect vectors and consequently the epidemiology of the diseases they transmit. This work examined the mosquito and sand fly fauna in the area of the Aimorés hydroelectric power plant, analyzing the seasonal distribution and the degree of species synanthropy in different ecotopes. Between November, 2008 and September, 2009, entomological captures were performed with the help of HP light traps in the rural, urban, and forest areas of Aimorés, Ituêta, Resplendor, and Baixo Guandu counties. The fauna proved to be quite diversified. Twenty-two species of mosquitoes and 11 species of sand flies were found. Culex quinquefasciatus was predominant among mosquitoes (76.7%), while Lutzomyia intermedia prevailed among sand flies (34.5%). Some of the captured species have medical interest. Supported by the high degree of synanthropy, those species reinforce the need for epidemiological surveillance. © 2012 The Society for Vector Ecology.

  14. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  15. Ultra-low-head hydroelectric technology: A review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Daqing; Deng, Zhiqun (Daniel)

    2017-10-01

    In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the current achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.

  16. Policy for rekindling and re-powering of small scale hydroelectric power plants; Politica de rejuvenescimento e repotenciacao de PCH`s

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Wanderley I. de [Companhia Paulista de Forca e Luz (CPFL), Campinas, SP (Brazil). Div. de Geracao

    1997-12-31

    The demand of electric energy comes increasing gradually and the offer of energy with of growth of the market, becomes a product, a great concern. In this matter Small Hydroelectric Power Plant SHP`s can be fundamental to offer support to the electric section, but these small sources of energy need to be adapting rekindling and repowering, being used of new market technologies and of economic studies that can give reliability and speed in the evaluations of the processes. (author)

  17. Cost basis for hydroelectric power plants. Price level of 01.01.1995; Kostnadsgrunnlag for vannkraftanlegg. Prisnivaa pr 01.01.1995

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, H.; Slapgaard, J.

    1995-08-01

    This publication provides a basis for calculation of expected average construction costs and equipment costs for large hydroelectric power plants in Norway. The publication is not intended to be a tool for projecting with regard to optimization or choice of construction types, but should be useful at an early stage of planning. There is a supplementary publication (Publication no. 20/1995) for small plants. 80 figs., 12 tabs.

  18. Hydroelectric power generation in an Alpine basin: future water-energy scenarios in a run-of-the-river plant

    Science.gov (United States)

    Bongio, Marco; Avanzi, Francesco; De Michele, Carlo

    2016-08-01

    We investigate scenarios of hydroelectric power generation for an Alpine run-of-the-river plant in 2050. To this end, we include a conversion from streamflow to energy in a hydrological model of the basin, and we introduce a set of benchmark climate scenarios to evaluate expected future production. These are a "future-like-present" scenario assuming future precipitation and temperature inputs to be statistically equivalent to those observed during the recent past at the same location, a "warmer-future" scenario, which considers an additional increase in temperature, and a "liquid-only" scenario where only liquid precipitation is admitted. In addition, two IPCC-like climatic scenarios (RCP 4.5 and RCP 8.5) are considered. Uncertainty in glaciers' volume is accounted by initializing the hydrological model with two different inventories of glaciers. Ensemble results reveal that 1) an average decrease between -40% and -19% of hydroelectric power generation in 2050 is predicted at the plant considered (with respect to present condition); 2) an average decrease between -20% and -38% of cumulative incoming streamflow volume at the plant is also predicted, again with respect to present condition; 3) these effects are associated with a strong average decrease of the volume of glaciers (between -76% and -96%, depending on the initial value considered). However, Monte Carlo simulations show that results are also prone to high uncertainties. Implications of these results for run-of-the-river plants are discussed.

  19. Feasibility study on the demonstrative test on the hybrid mini hydroelectric power generation technology. 2; Hybrid gata mini suiryoku hatsuden gijutsu ni kakawaru jissho shiken kanosei chosa. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    A study was made for the purpose of electrification of unelectrified zones of the mountainous areas in developing countries using extremely small hydroelectric power facilities. The target for this project is a development of a micro hydroelectric power system with a size of about 5kW, which is estimated regarding that 1 village has 80 houses and each house needs electricity of 60W. In the study, the low-head system using a weir of irrigation channels in Subang pref. of West Java state was selected by the evaluation of access, stability of flow rate, natural conditions, etc. The hydroelectric power plant is of a flow-in method in which water is taken from the left bank and is injected/discharged to the downstream of the left bank. As the hybrid complementary power source, hybrid battery with a two-hour charging time at peak and a capacity of 3.5kWh was considered. When estimating the construction cost of the hybrid micro hydroelectric power system and equalizing by durable years, the operational cost per kW is 15 times higher than the benefits which local people receive. It was judged to be difficult to say that the micro hydroelectric power system is economically feasible. It was predicted that the financial profit during the demonstrative test is good, according to a trial calculation of income from power rates and the operational cost. 18 refs., 90 figs., 53 tabs.

  20. Improvements for conventional clean energies: hydroelectric power

    International Nuclear Information System (INIS)

    Henry, P.

    1991-01-01

    Hydro-electric energy offers considerable possibilities and advantages which should be exploited before considering the construction of power which use fossil fuels. In fact: - hydro-electric is the only renewable energy available in very large quantities at competitive prices, - there are still many possibilities for producing it since at present only 14% is exploited, - hydraulic machines have been considerably improved over recent years, - the improvements make it possible to use watercourses in successive stages thus considerably reducing damage to the environment, - hydro-electric installations have a regulating effect, - vast areas of uncultivated land can be irrigated using the water reserves created by the artificial lakes. All these reasons favour intensive exploitation of hydro-electric energy reserves, in spite of the initial investment costs, which are sometimes higher than those for constructing fuel/driven power stations. (author) 9 figs., 1 tab., 3 refs

  1. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2006-01-01

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We use a method based on nonlinear programming (NLP), namely quadratic programming, to consider hydroelectric power generation a function of water discharge and of the head. The method has been applied successfully to solve a test case based on a realistic cascaded hydro system with a negligible computational time requirement and is also applied to show that the role played by reservoirs in the hydro chain do not depend only on their relative position. As a new contribution to earlier studies, which presented reservoir operation rules mainly for medium and long-term planning procedures, we show that the physical data defining hydro chain parameters used in the nonlinear model have an effect on the STHS, implying different optimal storage trajectories for the reservoirs accordingly not only with their position in the hydro chain but also with the new parameterisation defining the data for the hydro system. Moreover, considering head dependency in the hydroelectric power generation, usually neglected for hydro plants with a large storage capacity, provides a better short-term management of the conversion of the potential energy available in the reservoirs into electric energy, which represents a major advantage for the hydroelectric utilities in a competitive electricity market. (author)

  2. Estimation of free-flowingmicro hydroelectric power stations in Krasnoyarsk region

    OpenAIRE

    Kachina, E.; Botcharova, E.

    2010-01-01

    The external factors defining expediency of using micro hydroelectric power stations are considered. Exploration of areas of Krasnoyarsk region, which are suitable for usage of micro hydroelectric power stations is carried out. The market of primary real small hydroelectric engineering in Krasnoyarsk region is defined.

  3. The experience of Electricity Municipal Department of Pocos de Caldas, state of Minas Gerais, Brazil, in conception and construction of Antas 2 hydroelectric power plant: a hand-made power plant; A experiencia do Departamento Municipal de Eletricidade de Pocos de Caldas na concepcao e construcao da Usina Hidreletrica Antas 2: uma usina concebida e realizada na ponta do lapis

    Energy Technology Data Exchange (ETDEWEB)

    Moraes, Cicero Machado de [Departamento Municipal de Eletricidade de Pocos de Caldas, MG (Brazil); Nasseh, Oscar [Mecanica Pesada S.A., Taubate, SP (Brazil); Hellmuth, Harald [Siemens S.A. (Brazil)

    1993-12-31

    The Antas 2 hydroelectric power plant, located in Pocos de Caldas, state of Minas Gerais, Brazil, is under construction and have deadline to start operation in the beginning of 1994. Considered a high-head plant, with 165,05 m of fall, Antas 2 have three generation units of 5,7 MW and will supply a residential and industry demand of electric energy. This paper presents that the construction of an energy profit with this capacity can be performed under the mostly updated technologies with low costs, resulting in a high productivity, with reliance and asserted rentability profit 1 tab.

  4. TAPCHAN Wave Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    1983-10-01

    The Tapered Channel Wave Power Plant (TAPCHAN) is based on a new method for wave energy conversion. The principle of operation can be explained by dividing the system into the following four sub-systems: Firstly, a collector which is designed to concentrate the water energy and optimize collection efficiency for a range of frequencies and directions. Secondly, the energy converter, in which the energy of the collected waves is transformed into potential energy in an on-shore water reservoir. This is the unique part of the power plant. It consists of a gradually narrowing channel with wall heights equal to the filling level of the reservoir (typical heights 3-7 m). The waves enter the wide end of the channel and as they propagate down the narrowing channel, the wave height is amplified until the wavecrests spill over the walls. Thirdly, a reservoir which provides a stable water supply for the turbines. Finally, the hydroelectric power plant, where well established techniques are used for the generation of electric power. The water turbine driving the electric generator is of a low head type, such as a Kaplan or a tubular turbine. It must be designed for salt water operation and should have good regulation capabilities. Power plants based on the principle described, are now offered on a commercial basis.

  5. Energetic-economic dynamic computational analysis of plants with small capacity - Gera model

    International Nuclear Information System (INIS)

    Storfer, A.F.; Demanboro, A.C. de; Campello, C.A.G.B.

    1990-01-01

    A methodology and mathematical model for energy and economic analysis of hydroelectric power plants with low and medium capacity are presented. This methodology will be used for isolated or integrated hydroelectric power plants, including plants that part of their produced energy will go to the site market and part will go to regional electric system. (author)

  6. Feasibility determination of hydroelectric power generation at Patillas Reservoir, Puerto Rico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Huetter, J.J. Jr.

    1979-02-01

    The overall feasibility of retrofit for hydroelectric power generation at the Patillas Reservoir, an existing impoundment located near the town of Patillas, Puerto Rico, was studied. The scope of work and project intent is limited to establishing valid acceptance or non-acceptance criteria for this specific site as an example of power generation potential at existing dams of relatively low head (less than or equal to 20 m) in the United States. Information is included on hydrologic conditions at the site, retrofit plant design, economic analysis, environmental, legal, social and institutional aspects, and availability of plant equipment. It is concluded that generation of hydropower at Patillas is entirely practical and uncomplicated from an engineering viewpoint, has no adverse environmental effects and is economically justifiable for the island of Puerto Rico. The final agency or contractor roles for development are reasonably well-established. There are no prohibitory laws or regulations concerning this development. In fact, according to Puerto Rico legislation, such hydropower developments appear to be mandated. The installed capacity of the site ranges from 665 kW to approximately 1500 kW depending on extent of development of the available options. (LCL)

  7. Power market liberalisation: an opportunity for the hydroelectricity?

    International Nuclear Information System (INIS)

    Loth, P.

    2001-01-01

    This article discusses the future of hydroelectricity in the light of the ongoing liberalisation of the European power market. Compared to fossil electricity, hydroelectricity is a renewable energy source, has a limited impact on the environment, is able to meet strong variations of power demand, but is a little bit more costly. Hydroelectric companies expect the introduction of a quality label for their product as well as the increasing awareness of consumers for environmental aspects to become strong incentives for them to subscribe on green energy despite its higher cost. The cost difference will also be partly reduced by the introduction of a pollution tax on fossil energy sources. Figures on hydroelectricity capacity production, currently and in the near future, in the countries surrounding the Alps are presented. As an example, the business strategy of a Swiss electricity utility is shortly described

  8. Watermill and Small-Scale Hydroelectric Power Plant Landscapes Assessed According to Ecological Aspects

    Directory of Open Access Journals (Sweden)

    Lilita Lazdāne

    2013-10-01

    Full Text Available Research of watermill and small-scale hydroelectric power plant (HPP landscapes in Latvia according to ecological aspects is a part of a more complex research. The aim of this research is to examine the existing situation of watermill and small-scale HPP landscapes in Latvia by applying the ecological assessment criteria, and then try to formulate a definition of common tendencies of the landscape character. This paper provides a landscape inventory matrix for research in the field stu­dies of landscape identification at the local planning level. The duration of the research was from 2010 to 2012. The research includes 42 territories starting with the three most densely developed areas in Latvia: in Latgale, Kurzeme and Vidzeme uplands distribution ranges. The research results reflect tendencies of the landscape features assessed according to the previously developed criteria of ecological aspects.

  9. Private affairs [Canon del Pato hydroelectric project

    International Nuclear Information System (INIS)

    Moxon, S.

    1997-01-01

    The privatisation of the electric power industry in Peru has caused growth in its hydroelectric generation capacity. Increased interest in hydroelectric power, based on economic considerations, had led to decision on upgrading the two main hydropower plants which will provide almost 100 MW of extra capacity over a three year period, and provide competitively priced electric power. (UK)

  10. RECOVERY OF AN OXISOL DEGRADED BY THE CONSTRUCTION OF A HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Joseane Carina Borges de Carvalho

    2015-12-01

    Full Text Available ABSTRACT The removal of thick layers of soil under native scrubland (Cerrado on the right bank of the Paraná River in Selvíria (State of Mato Grosso do Sul, Brazil for construction of the Ilha Solteira Hydroelectric Power Plant caused environmental damage, affecting the revegetation process of the stripped soil. Over the years, various kinds of land use and management systems have been tried, and the aim of this study was to assess the effects of these attempts to restore the structural quality of the soil. The experiment was conducted considering five treatments and thirty replications. The following treatments were applied: stripped soil without anthropic intervention and total absence of plant cover; stripped soil treated with sewage sludge and planted to eucalyptus and grass a year ago; stripped soil developing natural secondary vegetation (capoeira since 1969; pastureland since 1978, replacing the native vegetation; and soil under native vegetation (Cerrado. In the 0.00-0.20 m layer, the soil was chemically characterized for each experimental treatment. A 30-point sampling grid was used to assess soil porosity and bulk density, and to assess aggregate stability in terms of mean weight diameter (MWD and geometric mean diameter (GMD. Aggregate stability was also determined using simulated rainfall. The results show that using sewage sludge incorporated with a rotary hoe improved the chemical fertility of the soil and produced more uniform soil pore size distribution. Leaving the land to develop secondary vegetation or turning it over to pastureland produced an intermediate level of structural soil quality, and these two treatments produced similar results. Stripped soil without anthropic intervention was of the lowest quality, with the lowest values for cation exchange capacity (CEC and macroporosity, as well as the highest values of soil bulk density and percentage of aggregates with diameter size <0.50 mm, corroborated by its lower

  11. The emergence of small hydroelectric plants and the urbanization process in the hinterland of São Paulo state (1890-1930)

    OpenAIRE

    Mortati, Débora Marques de Almeida Nogueira; Argollo Ferrão, André Munhoz de

    2011-01-01

    The period focused in this paper is from 1890 to 1930, when São Paulo state began its industrialization process, the coffee economy was booming and, in that context, it was founded the first hydroelectric power company in the state. This panorama advanced till 1930, when the coffee economy began in crisis, the industry was already established and the construction of hydroelectric plants after 1930 takes on another course: the large dams, closing the cycle of small hydroelectric plants. The el...

  12. Aquatic biology and hydroelectric power development in New Zealand

    National Research Council Canada - National Science Library

    Henriques, P. R

    1987-01-01

    .... The first section summarizes the country's hydroelectric resources and their utilization. The legal and planning framework associated with hydroelectric power development and the environment is covered in the second section...

  13. micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    the west region of Cameroon. KEYWORDS: Problems, micro hydroelectric, funds, craftsmen, Cameroon. INTRODUCTION. Energy from Water streaming down the mountains has been exploited since antiquity to replace muscular effort (Bessac, 2000). The perfection of devices used results today in hydroelectric turbines,.

  14. Brighter for small power plants

    International Nuclear Information System (INIS)

    Haaland, Leif

    2003-01-01

    The article presents a small tunnel drilling machine aimed at using for the construction of small hydroelectric power plants and mentions briefly some advantages economically and environmentally of both the machine and the power production solution

  15. Experience of Minas Gerais Energetic Company (CEMIG) in feasibility studies from hydroelectric power plants: energetic-economic studies

    International Nuclear Information System (INIS)

    Ramos, O.C.; Bras, A.J.F.; Batista Neto, R.P.; Salles Filho, M.P.

    1989-01-01

    The experience of Minas Gerais Energetic Company (CEMIG) - Brazil, on the use of dimensioning methodology for hydroelectric power plant from the Coordinated Group of Planning System was described, showing the problems with its use and the solutions, mainly the reservoir and the dimension of installed potential. It was concluded that the calculation procedures of the marginal costs for dimensioning, so as to become these costs more representative in future structure of the Brazilian generator park and less dependent to the oscillation due to conjuncture problems, must be re-evaluated. (C.G.C.). 7 refs, 3 figs, 1 tab

  16. Emissions from hydroelectric reservoirs and comparison of hydroelectricity, natural gas and oil

    International Nuclear Information System (INIS)

    Gagnon, L.; Chamberland, A.

    1993-01-01

    When reservoirs are created, a small fraction of the flooded organic matter decomposes into humic acids, carbon dioxide (CO 2 ), methane (CH 4 ), nitrogen, phosphorus, and other elements. The major greenhouse gases produced are CO 2 and CH 4 . For northern projects, Canadian studies on emissions from hydroelectric reservoirs have reached similar conclusions: Emissions, including methane, are less than 35 kg CO 2 equivalent per MWh. Using a typical project in northern Quebec as the basis for analysis, none of the studies dispute the considerable advantages of hydroelectricity regarding greenhouse gas emissions. Taking into account all components of energy systems, emissions of greenhouse gases from natural-gas power plants are 24 to 26 times greater than emissions from hydroelectric plants. The Freshwater Institute, in an article published in Ambio suggests that emissions from hydroelectric plants could be a significant source of greenhouse gases. This conclusion does not apply to most hydroelectric projects for two reasons: First, the Freshwater Institute's studies concerned flooded peatlands and shallow reservoirs that are not typical of most hydro projects; and second, the Institute analyzed a hydro project with a ratio of flooded area to energy production that is 6 to 10 times higher than typical projects in Canada. 7 refs, 4 tabs

  17. Herpetofauna, Santa Edwiges I and II hydroelectric power plants, state of Goiás, Brazil

    Directory of Open Access Journals (Sweden)

    Cintra, C. E. D.

    2009-01-01

    Full Text Available This paper presents a check list of amphibians and reptiles of the area under the influence of Santa Edwiges I and IIsmall hydroelectric power plants on Rio Buritis, state of Goiás, Brazil. The list was the result of faunal rescueoperations carried out between 31 August and 29 September 2005 (Santa Edwiges II and between 30 July and 12September 2006 (Santa Edwiges I. The list comprises 30 species of amphibians belonging to 16 genera and 8 families(Caeciliidae, Bufonidae, Cycloramphidae, Hylidae, Brachycephalidae, Leiuperidae, Leptodactylidae, andMicrohylidae, and 45 species of reptiles belonging to 38 genera and 16 families (Amphisbaenidae, Anguidae,Gekkonidae, Gymnophtalmidae, Polychrotidae, Scincidae, Teiidae, Tropiduridae, Anomalepididae, Leptotyphlopidae,Typhlopidae, Boidae, Colubridae, Dipsadidae, Elapidae, and Viperidae.

  18. Hydroelectric power is green, although controversial

    International Nuclear Information System (INIS)

    Schulp, A.

    2003-01-01

    Hydroelectric power is worldwide the most important source of renewable energy. Still, it has some controversial aspects, which are briefly discussed in this article, focusing on Belgium and the Netherlands [nl

  19. Changes in the state territory, systemic changes, the development of ecological thinking and the issues of the utilisation of hydroelectric power in Hungary

    Directory of Open Access Journals (Sweden)

    HAJDÚ Zoltán

    2012-09-01

    Full Text Available Each big river, including the Danube, makes a single system from their spring to their delta or estuary. Wherever we intervene into the system, this will be necessarily affect the whole of that. Thespillover effects are especially striking in the case of the lower reaches, in the Danube River in the Delta area. The utilisation of the hydroelectric power of the Danube River has been continuously on the agenda in the Hungarian areas since the turn of the 19th and 20th centuries, as an economic, planning, development and thenpolitical and environmental issue. The plans made before the World War I featured hydroelectric plants as the carriers of technical and scientific progress. World War I and the subsequent changes of the state borders swept these plans aside. Between the two world wars, the planning of hydroelectric power stations on the Danube wascontinued within the new state borders, two Hungarian governments and prime ministers of the time were fully committed to the construction of three power plants on the Danube River. After World War II, the hydroelectric plant planned on the Hungarian-Czechoslovakian border and its construction became a basic economic and, from the 1980s, an environmental issue. Finally, only a part of the planned hydroelectric power plant system was constructed, and the issue was not finally closed by specific interpretation of the international law. The Danube Strategy of the European Union, the programmes until 2020, the increase of the role of renewable anergies, the nuclear disaster in Japan, and the interests of international navigation filled the debate with new content. Thepossibility of the construction of hydroelectric power plants on the Danube River was “accidentally” put among the official documents of the government in power since 2010. The government declared it had nothing to do with the plans, and the debate has been going on since then.

  20. The emergence of small hydroelectric plants and the urbanization process in the hinterland of São Paulo state (1890-1930

    Directory of Open Access Journals (Sweden)

    Débora Marques de Almeida Nogueira Mortati

    2011-06-01

    Full Text Available The period focused in this paper is from 1890 to 1930, when São Paulo state began its industrialization process, the coffee economy was booming and, in that context, it was founded the first hydroelectric power company in the state. This panorama advanced till 1930, when the coffee economy began in crisis, the industry was already established and the construction of hydroelectric plants after 1930 takes on another course: the large dams, closing the cycle of small hydroelectric plants. The electricity generation in Brazil follows the paths of the railroad; and it was drawing newborders between rural and urban, rural and industry. The cities aspect was changing as the “improvements” were availability, many powered by electricity. The nascent industries were also occupying the space between the railroad and energy; what created new districts and centralities. Thispaper analyzes the processes that hydroelectric energy sets off in São Paulo state; and focuses on itsconsequences.

  1. Hydroelectric power in Switzerland: large growth potential by increasing the installed power

    International Nuclear Information System (INIS)

    Schleiss, A.

    2007-01-01

    Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates required by a new legislation to protect the rivers. The enforcement is due at latest when the present licenses for water utilization expire. On the other hand, the installed (peak) power might be further increased by 50% by retrofitting the existing installations and constructing the pumped-storage plants currently at the planning stage

  2. The process of granting of the authorization-registration of small-scale hydroelectric power plant; O processo de outorga de autorizacao-registro de PCHs

    Energy Technology Data Exchange (ETDEWEB)

    Lago, Rosangela; Nobrega, Andre Pepitone da [Agencia Nacional de Energia Eletrica (ANEEL), Brasilia, DF (Brazil). Superintendencia de Concessoes e Autorizacoes de Geracao

    2002-07-15

    Small hydroelectric power plant represent a fast and efficient way of promoting the expansion of electricity supply in order to meet the growing demand in the market place. Due to its characteristics, this type of enterprises operated enables better meet the needs of potential in small urban centers and rural regions, since, in most cases, complements the provision made by the interconnected system.

  3. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  4. Hydroelectric power plant operation procedures: more than a necessity, a competitive advantage; Procedimentos de operacao de usinas hidreletricas: mais que uma necessidade uma vantagem competitiva

    Energy Technology Data Exchange (ETDEWEB)

    Winck, Joao Carlos Candal; Marques, Jorge Luiz Giulian; Lovatto, Hedio Bitencourt; Lindau, Joao Carlos [Companhia Estadual de Energia Eletrica do Estado do Rio Grande do Sul, Porto Alegre, RS (Brazil)]. E-mails: jwinck@ceee.com.br; jorgem@ceee.com.br; hediol@ceee.com.br; joaol@ceee.com.br

    2000-07-01

    This paper report the reasons, the advantages, the phases, the methodology and the difficulties faced by the CEEE (Electric Energy Company of the State of Rio Grande do Sul - Brazil), when elaborating the 125 operation procedures, referred to the 13 from 15 hydroelectric power plants, during a 30 months work period.

  5. Actual state and perspectives of the small hydroelectric plants in Colombia

    International Nuclear Information System (INIS)

    Torres Q, E.; Castillo C, J.J.

    1995-01-01

    In this article, the actual state of the small-scale hydroelectric power plants (PCHs, abbreviations in Spanish) in Colombia in aspects as: Statistic of the water in Colombia, a brief historical review and the characteristics of the PCHs in Colombia, is present. The development PCHs, the executing projects and the actions that has been develop by the INEA (Institute of Nuclear Sciences and the Alternative Energies) is described

  6. Cooperation of nuclear, thermal and hydroelectric power plants in the power system

    International Nuclear Information System (INIS)

    1984-01-01

    The conference heard 36 papers of which 23 were incorporated in INIS. The subjects discussed were: the development of power industry in Czechoslovakia, methods of statistical analysis of data regarding nuclear power plant operation, the incorporation of WWER nuclear power plants in the power supply system, the standardization of nuclear power plants, the service life of components, use of nuclear energy sources, performance of the reactor accident protection system, the use of nuclear power and heating plants in Hungary, risk analysis, optimization of nuclear power plants, accidents caused by leakage of the primary and secondary circuit. (J.P.)

  7. Energy harvesting from hydroelectric systems for remote sensors

    Directory of Open Access Journals (Sweden)

    Joaquim Azevedo

    2016-10-01

    Full Text Available Hydroelectric systems are well-known for large scale power generation. However, there are virtually no studies on energy harvesting with these systems to produce tens or hundreds of milliwatts. The goal of this work was to study which design parameters from large-scale systems can be applied to small-scale systems. Two types of hydro turbines were evaluated. The first one was a Pelton turbine which is suitable for high heads and low flow rates. The second one was a propeller turbine used for low heads and high flow rates. Several turbine geometries and nozzle diameters were tested for the Pelton system. For the propeller, a three-bladed turbine was tested for different heads and draft tubes. The mechanical power provided by these turbines was measured to evaluate the range of efficiencies of these systems. A small three-phase generator was developed for coupling with the turbines in order to evaluate the generated electric power. Selected turbines were used to test battery charging with hydroelectric systems and a comparison between several efficiencies of the systems was made.

  8. Fish passage hydroelectric power plant Linne, Netherlands. Didson measurements; Vispassage waterkrachtcentrale Linne. Didson metingen

    Energy Technology Data Exchange (ETDEWEB)

    Van Keeken, O.A.; Griffioen, A.B. [Institute for Marine Resources and Ecosystem Studies IMARES, Wageningen UR, IJmuiden (Netherlands)

    2011-11-15

    The hydroelectric power plant in the Dutch Maas River near Linne has a fish deflection and passage system. For this study, two evenings in the months of August and September 2011 were dedicated to examining the extent to which fish approached and used the fish passage system. To establish the swimming behavior of the fish, a high-resolution sonar (DIDSON) was used, which generates moving images of fish in turbid waters, to study their behavior. [Dutch] Bij de waterkrachtcentrale in de Maas bij Linne is een visafweer- en geleidingssysteem aangelegd. In deze studie werd op twee avonden verdeeld over de maanden augustus en september 2011 gekeken in hoeverre vissen het visgeleidingssysteem benaderden en gebruikten. Voor het vaststellen van het zwemgedrag van de vissen is gebruik gemaakt van de DIDSON, een hoge resolutie sonar waarmee bewegende beelden kunnen worden gemaakt van vis in troebel water om het gedrag te bestuderen.

  9. What share for hydroelectricity in France?

    International Nuclear Information System (INIS)

    Bongrand, Th.; Bouvier, E.; Francois, M.; Martin, J.M.; Tardieu, B.; Vogien, M.; Cruchon, Ph.; Miquel, J.; Gariel, A.; Levasseur, L.; Mallet, J.P.

    2004-01-01

    This document gathers 10 presentations (articles) given at the 2. meeting on hydroelectricity, held at Grenoble on May 2004. The papers present some examples of realizations in the domain of small-hydropower, the R and D in progress and some recent advances in hydraulic engineering, the safety and quality aspects, and the environmental impacts and sustainable development of hydroelectric power: 1 - examples of small hydropower plants in France and in progress at SOGREAH (T. Bongrand); 2 - the pico-power plants implemented on drinkable water networks (E. Bouvier); 3 - MINI-AQUA: the mini-hydro solution (M. Francois); 4 - Grenoble and the Alpine valley, pole of hydraulic and hydroelectric competences (J.M. Martin); 5 - history and R and D (B. Tardieu); 6 - advances in engineering for a forefront industry (M. Vogien); 7 - improvement of hydraulic safety (P. Cruchon); 8 - a ISO 14001 certification experience in the domain of hydroelectricity (A. Gariel); 9 - the Rhone river development, reserved flow rate and sustainable development (L. Levasseur); 10 - small hydropower: impact and integration (J.P. Mallet). (J.S.)

  10. Operation management of thermal power plant. Karyoku plant no unten kanri

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-15

    Nowadays, thermal power plants are getting bigger and bigger in capacity. At the same time, high reliability to the frequent start and stop due to the demand change as well as effective economy. This paper describes the total operation management system. It included the start and stop, normal operation, specified operation, water quality, operation management involving the environmental problems, protection of machinery and equipment in case of emergency, measures against the failure, and the measures against the disaster. The outline of the normal operation is as follows: from the cost economical point of view, the kind of fuel is changed according to the load; i.e., coal for basic operation, LNG for basic to medium operation, and oil for medium to peak operation. The change in demand cannot be followed by the hydroelectric power. The adjustment of the power depending on the load change can be achieved by the thermal power generation. The automatic frequency control, economical load distribution control are also done. In the nighttime, the minimum load operation is required. The voltage change operation below the rated value or the phase-advancing operation is also done depending on the load conditions. 21 figs., 6 tabs.

  11. improvement of hydroelectric power generation using pumped

    African Journals Online (AJOL)

    HOD

    1, 4 DEPARTMENT OF SYSTEMS ENGINEERING, UNIVERSITY OF LAGOS, AKOKA, YABA, ... pumped storage system for generating hydroelectric power all year round. ... Power supply situation in Nigeria has no doubt ..... (objective functions), criteria for evaluation of control .... adsen H “Para eter esti ation in distributed.

  12. Technical and economical studies on the modernization of small-scale hydroelectric power plants: difficulties and proposals; Estudo tecnico-economicos de mordernizacao de PCH`s: Dificuldades e propostas

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Antonio Tadeu Lyrio de; Beltrame, Eduardo; Santos, Afonso Henriques Moreira; Souza, Zulcy [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1989-12-31

    This work describes and analyses some technical alternatives to be used in re-designing or reforming small-scale hydroelectric power plants. In addition, some criteria are also presented in order to proceed a comparative evaluation based on economic feasibility 7 refs. 5 figs. 1 tab.

  13. Technical and economical studies on the modernization of small-scale hydroelectric power plants: difficulties and proposals; Estudo tecnico-economicos de mordernizacao de PCH`s: Dificuldades e propostas

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Antonio Tadeu Lyrio de; Beltrame, Eduardo; Santos, Afonso Henriques Moreira; Souza, Zulcy [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1990-12-31

    This work describes and analyses some technical alternatives to be used in re-designing or reforming small-scale hydroelectric power plants. In addition, some criteria are also presented in order to proceed a comparative evaluation based on economic feasibility 7 refs. 5 figs. 1 tab.

  14. RENAP-MP: national PWR - medium nuclear power plant

    International Nuclear Information System (INIS)

    Meldonian, N.L.; Yamaguchi, M.; Kosaka, N.; Moreira, J.M.L.

    1994-01-01

    In this work are presented the main characteristics of a medium nuclear power plant, named RENAP - MP which has been developed by the Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN - SP) and Coordenadoria para Projetos Especiais (COPESP) from de Brazilian Navy. The study aims at determining the necessary conditions for such a plant complete, in Brazil, technically and economically with other means of thermal power generation, such as coal, gas and oil. Results show that the energy average cost should be around 59 dollars/MWh; the construction time should be less than 5 years in order to reduce financial costs; and the design should emphasize the use of inherently safe technology, in order to reduce substantially the risks of nuclear accidents. It should be pointed out that the nuclear power technology has some environmental and social advantages when compared to hydro and other thermal power technologies, since it does not require flooding of large areas, reduces green house and acid rain effects, and can be located near consumption areas. (author). 11 refs, 5 tabs

  15. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  16. Finland, Sweden and Austria doubled the share of hydroelectric power in EU

    International Nuclear Information System (INIS)

    Kangas, H.

    1996-01-01

    New EU countries Finland, Sweden and Austria increased the amount of hydroelectric power produced in EU in 1995 by more than 50 % compared to the year 1994. Especially Sweden and Austria are very dependent on hydroelectric power; the share of hydroelectric power is in Austria more than 70 % and even in Sweden it was nearly 50 %. The share of hydroelectric power in 1995 the EU region was 14 % of the total power demand. Due to the new EU countries the share of hydroelectric power of the total electric power demand, which would have decreased, increased by over 3 %. The increase of the electric power demand in Finland was lowest in the EU region, about 1.0 %, while it was in Greece 5.0 % and in Spain about 4.6 %. The share of nuclear power in the EU region was about 35 % in 1995. The most nuclear power dependent country in the EU was France there the share of nuclear power of the total electric power demand was 89 %. Both Finland and Sweden increased the production of back-pressure power generation in 1995. The share of back-pressure power generation in EU in 1995 was about 50 TWh which corresponds to some 1.5 % of the total electric power demand. About 50 % of the total electric power generation in EU was produced by condensing power generation. This production increased by 10 % compared to 1994. The netimport of electric power of EU increased by 80 % in Finland and Sweden, which are large importers of electric power outside the EU region

  17. Concept of underground nuclear power plant

    International Nuclear Information System (INIS)

    Onishi, Sotoaki

    1976-01-01

    The concept of constructing nuclear power plants on the sea or underground as the future sitting is based on moving the present power plants on the ground with actual results to the sea or underground without changing the design. The underground nuclear power plants have many similar points to underground hydro-electric power stations with many achievements in the construction viewpoint, though they have their proper difficult problems. Of course, it requires to excavate larger underground caves than the case of underground hydro-electric power plants. The maximum dimensions of the caves have been determined through experience in practice. Therefore the developments of design theory and construction technique are desirable in this field. In discussing underground construction, two evaluating methods are considered for the shielding effect of base rocks. The minimum vertical distance up to ground surface from the center of the cave differs depending upon the in-cave pressure, and the conditions of base rock, soil and underground water in case of the accident assumed in the design, and is approximately 60m, if the cave is assumed to be an indefinite cylindrical shape, by the safer side calculation in the above two evaluations. (Wakatsuki, Y.)

  18. The obtention of high reliability levels to the increasing of power in hydroelectric generators of modern power plants; A obtencao de altos indices de confiabilidade no aumento de potencia em hidrogeradores de usinas modernizadas

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Octavio A.; Uemori, Mauro K.I.; Spiridon, Michel W. [Asea Brown Boveri Ltda., Osasco, SP (Brazil)

    1993-12-31

    The increase in the power capacity of the generators of existing hydroelectric power plants is presented as an alternative technically feasible and economically advantageous to the increase of the power generation capacity of the Brazilian electric power system. This work presents the need of a global analysis of each case in order to optimize this process and also presents a methodology which may be applied to electric power generators, turbines, transformers and other electrical equipment. 2 refs., 8 figs.

  19. University-Company Cooperation in a Hydroelectric Plant: Cooperation Study in Environmental Management

    Directory of Open Access Journals (Sweden)

    Fabricio Mussi

    2017-05-01

    Full Text Available Hydroelectric power plants are considered strategic for the country when considering their relevance and impact on other sectors of the economy. However, the dynamics of the operation of a plant, its support structure and power generation activities can cause impacts on the environment, which must be constantly monitored in order to mitigate any environmental risks. The purpose of this study is to examine the partnership relations between a plant by menas of the creation of a department within the environmental management and universities and research institutes to identify specific partnerships in environmental management and hydroelectric plants. Six projects have been selected for analysis, four of them related to projects with universities and two related to cooperation with research institutes. The focus of the analysis was restricted to the main points observed in the management of these partnerships, which are: (a motivation for establishing partnerships, (b the composition of the estimated costs for implementing these partnerships, (c the difficulties of reconciling technical management and financial management, and (d the measurement of results and contributions from these interactions. Administrative practices of management of partnerships were also analyzed in the stages preceding cooperation for cooperation and further cooperation. Although other such studies are needed to strengthen the findings presented, one can conclude that the purposes of the establishment of cooperation in environmental management differ from those observed in other fields of knowledge such as engineering and biotechnology, for example.

  20. Obstacles to hydroelectric power. VDI conference on chances of hydroelectric power - conservation and environmental protection in conflict

    International Nuclear Information System (INIS)

    Sauer, H.D.

    1994-01-01

    Hydroelectric power is one of the most efficient energy sources and presents no CO 2 pollution problem, but there are obstacles as was shown at a VDI conference. Regional landscape conservation interests are in conflict with global environmental protection considerations. (orig.) [de

  1. Occupational allergy after exposure to caddis flies at a hydroelectric power plant.

    Science.gov (United States)

    Kraut, A; Sloan, J; Silviu-Dan, F; Peng, Z; Gagnon, D; Warrington, R

    1994-01-01

    A cross sectional survey was conducted in a hydroelectric power plant in which the workforce was exposed to large numbers of caddis flies. 28 of 57 employees participated. About 50% of the participants reported work related eye, nose, and sinus symptoms and wheezing. Working in locations with greater exposure to caddis flies was significantly associated with work related symptoms. 17 workers (61%) were skin prick positive to a laboratory prepared caddis fly antigen (LCFA) made from the remains of caddis flies present in the plant and 11 (39%) had positive reactions to a commercial caddis fly antigen (CCFA). Workers stationed in heavily exposed areas were 3.7 times as likely to have a positive response to the LCFA (p = 0.009) and 5.3 times as likely to have a positive response to the CCFA (p = 0.036). 13 (46%) of survey respondents reported three or more work related symptoms. 10 (91%) CCFA positive workers reported three or more work related symptoms. Pulmonary function studies revealed slight, but not significantly decreased forced vital capacity (FVC), forced expiratory volume in one second (FEV1), and FEV1/FVC ratios in workers who were skin test positive to either caddis fly preparation when compared with those who were negative. One worker who was skin test positive to both antigens had a cross shift fall in FEV1 of 20% predicted. Occupational allergy to caddis flies proved to be a significant health problem at this work site. PMID:8044233

  2. Fish population genetic structure shaped by hydroelectric power plants in the upper Rhine catchment.

    Science.gov (United States)

    Gouskov, Alexandre; Reyes, Marta; Wirthner-Bitterlin, Lisa; Vorburger, Christoph

    2016-02-01

    The Rhine catchment in Switzerland has been transformed by a chain of hydroelectric power stations. We addressed the impact of fragmentation on the genetic structure of fish populations by focusing on the European chub (Squalius cephalus). This fish species is not stocked and copes well with altered habitats, enabling an assessment of the effects of fragmentation per se. Using microsatellites, we genotyped 2133 chub from 47 sites within the catchment fragmented by 37 hydroelectric power stations, two weirs and the Rhine Falls. The shallow genetic population structure reflected drainage topology and was affected significantly by barriers to migration. The effect of power stations equipped with fishpasses on genetic differentiation was detectable, albeit weaker than that of man-made barriers without fishpasses. The Rhine Falls as the only long-standing natural obstacle (formed 14 000 to 17 000 years ago) also had a strong effect. Man-made barriers also exacerbated the upstream decrease in allelic diversity in the catchment, particularly when lacking fishpasses. Thus, existing fishpasses do have the desired effect of mitigating fragmentation, but barriers still reduce population connectivity in a fish that traverses fishpasses better than many other species. Less mobile species are likely to be affected more severely.

  3. The using of alternative energy sources: the case of Small Hydroelectric Power Plants and the natural gas fuelled thermal electric power plants; O uso de fontes alternativas de energia: o caso das Pequenas Centrais Hidreletricas (PCHs) e das termoeletricas movidas a gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Patricia Aparecida Pereira; Mauad, Frederico Fabio [Sao Paulo Univ., Sao Carlos, SP (Brazil). Escola de Engenharia. Centro de Recursos Hidricos e Ecologia Aplicada; Leme, Alessandro Andre [Sao Carlos Univ., SP (Brazil). Programa de Pos-graduacao em Ciencias Sociais; Valencio, Norma Felicidade Lopes da Silva [Sao Carlos Univ., SP (Brazil). Dept. de Ciencias Sociais

    2002-07-01

    This paper emphasizes the modifications occurred in the brazilian electric sector at the end of the twenty century. The work also highlight the alternative sources (Small hydroelectric and thermoelectric power plants) as the most feasible in the political and institutional scenery for the complementation of the generator park.

  4. West Kootenay Power Ltd. : Application to sell its hydroelectric generation assets : Decision

    International Nuclear Information System (INIS)

    Ostergaard, P.; Bradley, P.G.; Clemenhagen, B.L.

    2001-01-01

    An investor-owned electric utility providing wholesale and retail service in the West Kootenay and South Okanagan regions of British Columbia, West Kootenay Power Ltd. (WKP) sought the approval from the British Columbia Utilities Commission to sell the four hydroelectric power plants and related facilities to Kootenay River Power Corporation (KRP), and for the purchase by WKP of the output of these plants under a 60-year power purchase agreement. The four hydroelectric plants have a combined rated capacity of approximately 214 MW. Most of the energy and capacity needs of WKP are met via power purchase contracts and agreements, as winter peak loads approach 700 MW. As a result of share purchases, KRP would be 50 per cent owned by each of a provincial Crown Corporation, Columbia Power Corporation (CPC) and a wholly-owned subsidiary of the Columbia Basin Trust (CBT), CBT Energy Inc., if the transactions are allowed to proceed. Three principal agreements are of interest: the Asset Transfer Agreement (ATA), the Share Purchase Agreement (SPA), and the Power Purchase Agreement (PPA). During the review process, two main issues warranted special consideration: the treatment of the proceeds of the sale of assets, and the statutory parameters used by the Commission for the adjudication of the Application. The Application was submitted March 22, 2001, and the public hearing process began May 29, 2001. This Application is unique, in that it contains three agreements that would each require a separate review, but WKP requested that the agreements be considered in their aggregate. The Commission complied, and decided to deny the Application. Unless the terms of the sale are restructured, the transfer of assets to Kootenay River Power Corporation will not be approved by the Commission. Within one month of the date of this decision, WKP is to notify the Commission of its intentions, since it had signified that it would not proceed with the sale unless WKP shareholder receives 100

  5. THE SIGNIFICANCE OF STRUCTURAL AND GEOLOGICAL RELATIONSHIP ASSESSMENT IN THE CONSTRUCTION OF THE OMBLA UNDERGROUND HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Renato Buljan

    1997-12-01

    Full Text Available The construction design of the underground hydroelectric plant Ombla required geological and structural investigations to he carried out. Due to past earthquakes in the area permanent tectonic movements were inferred. Therefore, in the wider and adjacent surroundings of the Ombla spring it was necessary to analyze the structural fabric and the geodynamic characteristics of the area. The most active zone encountered is the front part of a thrust fault belonging to the Dinaricum regional structural unit. The compressive regime is maintained as a response to the regional stress of an approximately S-N orientation. Different displacements of various parts of the Dinaricum unit are present. Along the rim of the structural blocks, the Hum-Om-bla fault zone extends, accompanied by left transcurrent faults, Through this zone the main groundwater drainage occurs supplying the Ombla spring. In the local Ombla spring area this zone is characterized by three sub-blocks and three major faults. The most important fault for the vital facilities of the Ombla hydroelectric power plant is the Pločice fault which divides the structural sub-blocks. Along this fault zone there are four mutually connected. The lowest two arc active groundwater draining systems supplying the Ombla spring. The data on local stress implies the following deformation of sub-blocks: sub-blocks 2c and 2f are displaced along normal faults from 20° to 30° to the left, downwards, while the sub-block 2 d is displaced along the Pločice thrust fault of 100° to 130° to the left, upwards. The structural data confirmed that the building of an underground dam with a height from 100 to 130 m was feasible. The connection between the caverns and the fault zone was determined. The unfavorable position of the active Pločice fault zone imposes the construction of vital Ombla power plant facilities underground.

  6. Prospects for power plant technology

    International Nuclear Information System (INIS)

    Schilling, H.D.

    1993-01-01

    Careful conservation of resources in the enlarged context of the rational utilization of energy, the environment and capital will determine future power plant technology. The mainstays will be the further development of power plant concepts based on fossil (predominantly coal) and nuclear fuels; world-wide, also regenerative and CO 2 -free hydro-electric power will play a role. Rapid conversion of the available potential requires clear, long-term stable and reliable political framework conditions for the release of the necessary entrepreneurial forces. (orig.) [de

  7. Nuclear Power Plants (Rev.)

    Energy Technology Data Exchange (ETDEWEB)

    Lyerly, Ray L.; Mitchell III, Walter [Southern Nuclear Engineering, Inc.

    1973-01-01

    Projected energy requirements for the future suggest that we must employ atomic energy to generate electric power or face depletion of our fossil-fuel resources—coal, oil, and gas. In short, both conservation and economic considerations will require us to use nuclear energy to generate the electricity that supports our civilization. Until we reach the time when nuclear power plants are as common as fossil-fueled or hydroelectric plants, many people will wonder how the nuclear plants work, how much they cost, where they are located, and what kinds of reactors they use. The purpose of this booklet is to answer these questions. In doing so, it will consider only central station plants, which are those that provide electric power for established utility systems.

  8. Integration of Lithium-Ion Battery Storage Systems in Hydroelectric Plants for Supplying Primary Control Reserve

    Directory of Open Access Journals (Sweden)

    Fabio Bignucolo

    2017-01-01

    Full Text Available The ever-growing diffusion of renewables as electrical generation sources is forcing the electrical power system to face new and challenging regulation problems to preserve grid stability. Among these, the primary control reserve is reckoned to be one of the most important issues, since the introduction of generators based on renewable energies and interconnected through static converters, if relieved from the primary reserve contribution, reduces both the system inertia and the available power reserve in case of network events involving frequency perturbations. In this scenario, renewable plants such as hydroelectric run-of-river generators could be required to provide the primary control reserve ancillary service. In this paper, the integration between a multi-unit run-of-river power plant and a lithium-ion based battery storage system is investigated, suitably accounting for the ancillary service characteristics as required by present grid codes. The storage system is studied in terms of maximum economic profitability, taking into account its operating constraints. Dynamic simulations are carried out within the DIgSILENT PowerFactory 2016 software environment in order to analyse the plant response in case of network frequency contingencies, comparing the pure hydroelectric plant with the hybrid one, in which the primary reserve is partially or completely supplied by the storage system. Results confirm that the battery storage system response to frequency perturbations is clearly faster and more accurate during the transient phase compared to a traditional plant, since time delays due to hydraulic and mechanical regulations are overpassed. A case study, based on data from an existing hydropower plant and referring to the Italian context in terms of operational constraints and ancillary service remuneration, is presented.

  9. Modernization of Henry Borden hydroelectric power plant: The ELETROPAULO`s, The Electric Power Company of Sao Paulo State, experience in no.1 generator power improvement; Modernizacao da Usina Henry Borden (a experiencia da ELETROPAULO na repotenciacao do gerador nr. 1)

    Energy Technology Data Exchange (ETDEWEB)

    Delbone, Edval; Matos, Jose Alberto da S.; Grassi, Marco A; Oliveira, Robinson C; Sertori, Sergio R [Eletricidade de Sao Paulo SA, SP (Brazil); Duarte, F I; Pires, Nilo Ramos; Yamagushi, Luiz Massao [Asea Brown Boveri (ABB) (Brazil)

    1996-12-31

    The need for the substitution of several the generating equipment of Henry Borden hydroelectric power plant due to the end of their service life, in addition to the difficult economic situation and specific characteristics of the unit, leaded ELETROPAULO company to decide for the power improvement of some equipment. This work presents this experience giving special emphasis to the procedure adopted and results obtained 2 tabs.

  10. Ecological improvements to hydroelectric power plants under EEG. Guidance to environmental verifiers and water rights authorities

    International Nuclear Information System (INIS)

    Meyr, Christoph; Pfeifer, Hansjoerg; Schnell, Johannes; Hanfland, Sebastian

    2011-11-01

    The use of hydropower as a renewable form of energy is experiencing a renaissance due to the energy transition in Bavaria. The fishery evaluate not uncritically this development, because hydroelectric plants generally normally represent a considerable intervention in water and therefore in the habitat of the fish. In this case it should be noted that just often not even the minimum requirements of ecology are fulfilled at existing plants according to the Federal Water Act. [de

  11. Impact of the construction of a hydroelectric power plant on the land cover and use: study of the basin Lajeado Bonito - RS

    International Nuclear Information System (INIS)

    Tramontina, Juliana; Breunig, Fabio Marcelo

    2015-01-01

    This work aims to analyze the impact of the construction of a hydroelectric power plant on land cover and use in Lajeado Bonito-RS watershed. The study evaluated the temporal evolution of land cover and use in the watershed for the period before and after to installation of hydroelectric plant Foz do Chapeco (2009 to 2010). For temporal analysis, two images were interpreted, one orbital image of High Resolution Camera (HRC) onboard of the CBERS-2B, acquired in December 29, 2009. And a high-resolution image obtained from Google Earth application, acquired at December 26, 2010. The land cover and use maps were generated by vector editing SPRING software. We found that the predominant land use related to agriculture and livestock, including bare soil. In 2009 this class accounted for 70.23% of the total area, while it come to represent 61.8% in 2010. At the same time, there was increase of areas with native forest cover, from 27.49% covered by forest in 2009, to 31% in 2010. The results showed that in both 2009 and 2010 years, approximately 49% of permanent preservation area were used inappropriately. (author)

  12. Estimation of small-scale hydroelectric power plant costs; Estimacao de custos de PCH

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [MS Consultoria Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Silva, Benedito Claudio da [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Magalhaes, Ricardo Nogueira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil)

    2010-07-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  13. Evaluation of environmental impacts caused by hydroelectric power plants in native forest areas and mitigation measures

    International Nuclear Information System (INIS)

    Ramalho, Cyro Pinheiro

    1992-01-01

    The following work has the intention of demonstrating the importance of native forest to the human life, not only through its inherent qualities as something to preserve, but also as a source of great resources, and in particular hydroelectric resource that, by today's necessities are bounded to be explored. The negative effects caused by the implementation of a hydroelectric plant are shown together with the necessity of adoption of measures that would soften the environment impact of it. For the adoption of those measures, many forest studies were proposed in the search for its complete characterization. Each of these studies are duly defined and presented in their general and specific goals. The most adequate methodology is finally recommended. (author). 14 refs

  14. Sub-Saharan hydroelectric power development potential

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1991-01-01

    Though evidencing a power demand which is amongst the lowest in the world, the sub-Saharan regions of Africa are blessed with an enormous hydroelectric power resource potential, which, if suitably developed and tapped, may become a source of economic electric energy for Europe. With the aid of numerous statistical supply and demand data, this paper surveys the marketing potential of this energy source in Africa. The analysis of future development prospects is carried out with reference to the local socio-economic framework

  15. Modernisation of hydrogenerators. Upgrading of power plants for more efficiency; Modernisierung von Hydrogeneratoren. Kraftwerks-Upgrade fuer mehr Effizienz

    Energy Technology Data Exchange (ETDEWEB)

    Allen, John

    2012-07-01

    Ever since the construction of the first alternating current hydroelectric power plant with a performance of 12.5 kW in the year 1882, the number and performance of hydroelectric power plants had increased substantially. For example, the hydroelectric power plant at the Three Gorges Dam in the People's Republic of China has a total performance of 22,500 MW. The isolation systems of the hydrogenerators have a limited lifetime and have to be exchanged after fifty years usually. Under this aspect, the authors of the contribution under consideration reports on the upgrading of hydrogenerators for more efficiency.

  16. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  17. The determinants of cost efficiency of hydroelectric generating plants: A random frontier approach

    International Nuclear Information System (INIS)

    Barros, Carlos P.; Peypoch, Nicolas

    2007-01-01

    This paper analyses the technical efficiency in the hydroelectric generating plants of a main Portuguese electricity enterprise EDP (Electricity of Portugal) between 1994 and 2004, investigating the role played by increase in competition and regulation. A random cost frontier method is adopted. A translog frontier model is used and the maximum likelihood estimation technique is employed to estimate the empirical model. We estimate the efficiency scores and decompose the exogenous variables into homogeneous and heterogeneous. It is concluded that production and capacity are heterogeneous, signifying that the hydroelectric generating plants are very distinct and therefore any energy policy should take into account this heterogeneity. It is also concluded that competition, rather than regulation, plays the key role in increasing hydroelectric plant efficiency

  18. Hydroelectricity: an asset for a successful energy transition in France

    International Nuclear Information System (INIS)

    Galland, J.C.; Vincent, E.

    2013-01-01

    France's national debate on energy transition has served as a reminder that hydroelectric power plays a significant role in French electricity production. With installed power totalling 25400 MW at end 2012 (the second largest in Europe), France's hydroelectric plants produced 63.8 TWh last year (the third largest in Europe), almost 12% of total output. It is France's second largest means of producing electricity and it represents more than 80% of production of renewable energy. A source of energy developed a long time ago, thus benefiting from technological maturity, hydroelectricity can be produced in large quantity at the heart of France's regions, while also rendering indispensable service for the equilibrium of the French electricity system by compensating the intermittency of other renewable energy sources. The production costs of hydroelectric power are the lowest among all power generation technologies. (authors)

  19. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    International Nuclear Information System (INIS)

    Popa, R; Popa, B; Popa, F; Zachia-Zlatea, D

    2010-01-01

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  20. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    Energy Technology Data Exchange (ETDEWEB)

    Popa, R; Popa, B [Faculty of Power Engineering, University Politehnica of Bucharest, 313 Spl. Independentei, sect. 6, Bucharest, 060042 (Romania); Popa, F [Institute for Hydropower Studies and Design, 5-7 Vasile Lascar, sect. 2, Bucharest, 020491 (Romania); Zachia-Zlatea, D, E-mail: bogdan.popa@rosha.r [Hidroelectrica S.A., 3 Constantin Nacu, sect. 2, Bucharest, 020995 (Romania)

    2010-08-15

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  1. Formation of a local Abramis brama orientalis (BERG) population in the zone of hot effluent from the Konakovo hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Sappo, G B

    1976-01-01

    Bream (Abramis brama orientalis) inhabitating the part of the Ivan'kovo Reservoir directly exposed to effluent from the Konakovo Hydroelectric Power Plant are smaller and become sexually mature sooner than elsewhere in the reservoir. Moreover, they have longer tail peduncles and anal, thoracic, and dorsal fins than other bream. And, in contrast with the latter, many (20 percent) have two rows of pharyngeal teeth. Thus, the differences in ecological (growth rate, condition factor, spawning times, etc.) and meristic and plastic characters (branched rays, enlarged fins, etc.) as well as in composition of parasites point to the development of an isolated bream population.

  2. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Science.gov (United States)

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  3. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ... for Hydroelectric Power Development at the Granby Dam Outlet, a Feature of the Colorado-Big Thompson... Reclamation, will consider proposals for non-Federal development of hydroelectric power at Granby Dam Outlet of the C-BT, Colorado. Reclamation is considering such hydroelectric power development under a lease...

  4. Hydroelectric project EA's [environmental assessments]: The Magpie development in northern Ontario

    International Nuclear Information System (INIS)

    Ashwood, K.

    1992-01-01

    Great Lakes Power recently constructed a hydroelectric plant on the Magpie River near Wawa, Ontario. The project involved three main elements: construction of a 33 m high dam, a 15.5 MW power station, and a spillway at Steephill Falls; construction of a 3.5 m high overflow weir just above the crest of scenic Magpie Falls, creating a head pond to supply a 15 MW power plant; and construction of a weir and 15 MW power plant at Mission Falls. Although this was a private development and therefore not automatically subject to Ontario's Environmental Assessment Act, Great Lakes Power decided to conform with the act's requirements and undertook a comprehensive environmental assessment (EA). Environmental issues were focused on changes in hydrology and water quality, impacts on fisheries and natural resources, slope stability and erosion, socioeconomic impacts, impacts on heritage resources, and impacts on tourism and recreation. The project was approved subject to conditions which included implementation of mitigation and monitoring requirements outlined in the EA document. Environmental specialists worked closely with the engineers at the detailed design stage of the project, resulting in modifications to the preliminary design to minimize environmental impacts

  5. The performance study of a small hydroelectric power system

    International Nuclear Information System (INIS)

    Al-Jumaily, Khalil E. J.; Tawfi, Sinan Samir

    2006-01-01

    A small hydroelectric power system of an undershot waterwheel was designed, constructed and experimented in the hydraulic channel which has a sluice gate as a small dam. The constructed waterwheel diameter could be changed from 0.4 m to 0.6 m at interval steps of 0.04 m. The number of blades of the constructed waterwheel could be changed from 9 to 12 to 18 and to 36 blades. By increasing the water mass flow rate from 0.341 to 1.765 kg/s at channel cross sectional area (12.75 cm 2 ), the undershot waterwheel generated power which increased to 0.201 Watt, the mechanical efficiency increased to more than 10.8%, and the electrical efficiency increased to more than 80.6%. But the channel efficiency was decreased to 10.9%. while the volumetric efficiency was fixed at 72.9%. The waterwheel efficiency 17.25 m 2 at fixed water mass flow rate (1.765kg/s), the undershot waterwheel generated power system decreased in the following. The generator output power from 0.201 to 0.067 Watt, the mechanical efficiency reduced to 26.7% and the electrical efficiency reduced 94.4% and increased the channel efficiency from 8.6% to 100%, the volumetric efficiency from 70.9% to 75.5%, and the waterwheel efficiency from 85.7%( to 91.3%. The transitional efficiency was fixed at 97.9%. The maximum overall efficiency of the small generated power system was 6.69% at the water head 15.45 cm. The output power was 0.18 Watt. these values obtained when the number of blades 36, number of revolutions per minute 57 rpm, waterwheel diameter 0.44 m, water mass flow rate 1.765 kg/s, and channel cross sectional area 12.75 cm 2 . The theoretical extrapolation of the waterwheel diameter to 2 m with water head of 5 m gives an output generated power of 675 Watt.(Author)

  6. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  7. The impact of a hydroelectric power plant on the sediment load in downstream water bodies, Svartisen, northern Norway.

    Science.gov (United States)

    Bogen, J; Bønsnes, T E

    2001-02-05

    When the Svartisen hydroelectric power plant was put into operation, extensive sediment pollution was observed in the downstream fjord area. This paper discusses the impact of the power plant and the contribution from various sources of sediment. Computation of the sediment load was based on samples collected one to four times per day. Grain size distribution analyses of suspended sediments were carried out and used as input in a routing model to study the movement of sediments through the system. Suspended sediment delivered to the fjord before the power station was constructed was measured as 8360 metric tons as an annual mean for a 12-year period. During the years 1995-1996 when the power plant was operating, the total suspended load through the power station was measured as 32609 and 30254 metric tons, respectively. Grain size distribution analyses indicate a major change in the composition of the sediments from 9% clay before the power plant was operative to 50-60% clay afterwards. This change, together with the increase in sediment load, is believed to be one of the main causes of the drastic reduction in secchi depths in the fjord. The effect of the suspended sediment load on the fjord water turbidity was evaluated by co-plotting secchi depth and power station water discharge. Measurements during 1995 and 1996 showed that at the innermost of these locations the water failed to attain the minimum requirement of 2 m secchi depth. In later years secchi depths were above the specified level. In 1997 and 1998 the conditions improved. At the more distal locality, the conditions were acceptable with only a few exceptions. A routing model was applied to data acquired at a location 2 km from the power station in order to calculate the contributions from various sediment sources. This model indicated that the contribution from reservoir bed erosion dominated in 1994 but decreased significantly in 1995. Future operation of the power station will mostly take place with

  8. The environment and the hydroelectric in Amazonia

    International Nuclear Information System (INIS)

    La Rovere, E.L.

    1992-01-01

    Some aspects about social and environmental impacts due to the hydroelectric power plants constructed in Amazonia region are presented, including considerations of energy planning and management with international example. (C.G.C.)

  9. Lessons Learned after Nuclear Power Plants and Hydropower Plants Accidents

    Energy Technology Data Exchange (ETDEWEB)

    Moskalenko, A., E-mail: gce@gce.ru [GCE Group, Saint Petersburg (Russian Federation)

    2014-10-15

    Full text: The World is becoming more open and free for communication. However, the experience (positive or negative) is still badly cross over sectorial borders. I would like to illustrate the point with the examples, even with several unexpected ones. I would like to start with a few words regarding the Sayano – Shushenskaya Hydro Power Plant accident and the factors that caused it. Sayano – Shushenskaya Hydro Power Plant is a unique Hydro Power Plant with efficiency factor of 96 %. Nevertheless, the efficiency factor, in particular, caused a series of restrictions: hydro-electric units vibration amplitude must not exceed 4 micron!!! (Slide 1: Vibration amplitude dependence on output capacity) As it is clearly seen, there is a so called “prohibited area”, which the hydro-electric unit must pass over. Operations in the area are prohibited in accordance with the regulatory documents. However, due to the changes that occurred in Russian power supply industry, the hydro-electric unit passed through the prohibited area more than 12 times, if we take into account only the day of the accident. The bolts keeping the turbine cover, keeping water apart from the machinery hall, were too much released. The mentioned above reasons led to the hydro-electric unit disruption and the machinery hall flooding. Water inflow was possible to stop by putting down the regulating valves. However, the regulating valves control console was in the flooded machinery hall. There was standby emergency control console, but it was in the machinery hall, as well. The machinery hall was flooded, consequently, main and standby systems were destroyed. Moreover, the machinery hall, where all the units were disposed, was a huge hall without dividing walls, etc. (Photo) Take a look at the next slide. (Photo – Chernobyl Nuclear Power Plant machinery hall). Take note of Fukushima–1 Nuclear Power Plant: standby power supply source was situated in the same place and destroyed by water. All the

  10. Categorization of the trophic status of a hydroelectric power plant reservoir in the Brazilian Amazon by statistical analyses and fuzzy approaches.

    Science.gov (United States)

    da Costa Lobato, Tarcísio; Hauser-Davis, Rachel Ann; de Oliveira, Terezinha Ferreira; Maciel, Marinalva Cardoso; Tavares, Maria Regina Madruga; da Silveira, Antônio Morais; Saraiva, Augusto Cesar Fonseca

    2015-02-15

    The Amazon area has been increasingly suffering from anthropogenic impacts, especially due to the construction of hydroelectric power plant reservoirs. The analysis and categorization of the trophic status of these reservoirs are of interest to indicate man-made changes in the environment. In this context, the present study aimed to categorize the trophic status of a hydroelectric power plant reservoir located in the Brazilian Amazon by constructing a novel Water Quality Index (WQI) and Trophic State Index (TSI) for the reservoir using major ion concentrations and physico-chemical water parameters determined in the area and taking into account the sampling locations and the local hydrological regimes. After applying statistical analyses (factor analysis and cluster analysis) and establishing a rule base of a fuzzy system to these indicators, the results obtained by the proposed method were then compared to the generally applied Carlson and a modified Lamparelli trophic state index (TSI), specific for trophic regions. The categorization of the trophic status by the proposed fuzzy method was shown to be more reliable, since it takes into account the specificities of the study area, while the Carlson and Lamparelli TSI do not, and, thus, tend to over or underestimate the trophic status of these ecosystems. The statistical techniques proposed and applied in the present study, are, therefore, relevant in cases of environmental management and policy decision-making processes, aiding in the identification of the ecological status of water bodies. With this, it is possible to identify which factors should be further investigated and/or adjusted in order to attempt the recovery of degraded water bodies. Copyright © 2014 Elsevier B.V. All rights reserved.

  11. Medium-size nuclear plants

    International Nuclear Information System (INIS)

    Vogelweith, L.; Lavergne, J.C.; Martinot, G.; Weiss, A.

    1977-01-01

    CEA (TECHNICATOME) has developed a range of pressurized water reactors of the type ''CAS compact'' which are adapted to civil ship propulsion, or to electric power production, combined possibly with heat production, up to outputs equivalent to 125 MWe. Nuclear plants equipped with these reactors are suitable to medium-size electric networks. Among the possible realizations, two types of plants are mentioned as examples: 1) Floating electron-nuclear plants; and 2) Combined electric power and desalting plants. The report describes the design characteristics of the different parts of a 125 MWe unit floating electro-nuclear plant: nuclear steam system CAS 3 G, power generating plant, floating platform for the whole plant. The report gives attention to the different possibilities according to site conditions (the plant can be kept floating, in a natural or artificial basin, it can be put aground, ...) and to safety and environment factors. Such unit can be used in places where there is a growing demand in electric power and fresh water. The report describes how the reactor, the power generating plant and multiflash distillation units of an electric power-desalting plant can be combined: choice of the ratio water output/electric power output, thermal cycle combination, choice of the gain ratio, according to economic considerations, and to desired goal of water output. The report analyses also some technical options, such as: choice of the extraction point of steam used as heat supply of the desalting station (bleeding a condensation turbine, or recovering steam at the exhaust of a backpressure turbine), design making the system safe. Lastly, economic considerations are dealt with: combining the production of fresh water and electric power provides usually a much better energy balance and a lower cost for both products. Examples are given of some types of installations which combine medium-size reactors with fresh water stations yielding from 10000 to 120000 m 3 per day

  12. Robust Optimisation for Hydroelectric System Operation under Uncertainty

    OpenAIRE

    Apostolopoulou, D.; De Greve, Z.; McCulloch, M.

    2018-01-01

    In this paper, we propose an optimal dispatch scheme for a cascade hydroelectric power system that maximises the head levels of each dam, and minimises the spillage effects taking into account uncertainty in the net load variations, i.e., the difference between the load and the renewable resources, and inflows to the cascade. By maximising the head levels of each dam the volume of water stored, which is a metric of system resiliency, is maximised. In this regard, the operation of the cascade ...

  13. Central hydroelectric of Santa Ana

    International Nuclear Information System (INIS)

    Pardo A, German

    2000-01-01

    The paper is related to the construction of an alternating tunnel of conduction to take advantage of the available hydraulic load among the Wiesner Plant and Santa Ana's tanks and of Suba, works required to build a hydroelectric power station with a generation capacity of approximately of 12 MW

  14. Impacts of nuclear and hydroelectric great projects: economical, technological, environmental and social aspects

    International Nuclear Information System (INIS)

    Rosa, L.P.; Sigaud, L.; Mielnik, O.

    1988-01-01

    Some studies about the Great Impacts of Energy Sources, mainly nuclear power plant and hydroelectric power plant, in Brazil are presented. The technological, economical, social and environmental aspects are described [pt

  15. Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.; Skvortsova, A. E., E-mail: SkvortsovaAE@vniig.ru [B. E. Vedeneev All-Russia Research Institute of Hydraulic Engineering (VNIIG) (Russian Federation)

    2017-01-15

    Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.

  16. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Science.gov (United States)

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...

  17. ORSIM, Nuclear Fuel, Fossil Fuel Hydroelectric Power Plant Cost and Economics

    International Nuclear Information System (INIS)

    Prince, B.E.; Turnage, J.C.

    1984-01-01

    1 - Description of problem or function: ORSIM is an electric power generating system integration model which simulates the multi-year operation of a mixed power system consisting of fossil, nuclear, hydroelectric, and pumped-storage units. For any specified refueling schedule for nuclear units and future load forecast, the model determines a plan of operation for the system which attempts to minimize the total discounted operating cost over a specified study period. The analysis considers the effects of forced outages, spinning reserve operating constraints, and scheduled introduction and retirement of generating stations. The model determines a maintenance schedule for the non-nuclear stations (nuclear stations are maintained during refueling outages) and the optimum allocation of energy-fixed nuclear and hydroelectric resources. It calculates the expected energy generated by each station in the system, by period over the planning horizon, based on input or calculated incremental operating cost. It also calculates the expected loss-of- load probability and un-served energy demand for each period in the planning horizon. An optimum operating plan, designed to minimize the discounted total production cost, is then calculated, as are the costs of operating each station in the system and the discounted total production cost for the derived plan of operation. 2 - Method of solution: ORSIM searches for a particular mode of operation which, over a multi-year planning horizon, will minimize the total system operating cost of a particular electric power generation system discounted to the beginning of the planning horizon. It does this by: (a) calculating the planned maintenance outages for all units; (b) estimating the incremental discounted cost of energy produced by each station in the system for every subinterval of the planning horizon; (c) utilizing the incremental discounted costs of energy generation to calculate, via probabilistic simulation, the economic optimum

  18. Hydraulic potential evaluation for micro - scale hydroelectric generation at Chicamocha River Basin - micro - scale hydroelectric plants

    International Nuclear Information System (INIS)

    Pacheco P, C.M.; Parga C, G.M.

    1995-01-01

    In development of technical and scientific cooperation treaty carried out between INEA (today Ingeominas) and Catholic University of Colombia, was elaborated the program: Potential Evaluation Hydraulic for Small hydroelectric plants; whose purpose is to carry electrical energy service to smaller populations and rural zones to all municipalities of country. To begin the program was selected the corresponding area to Chicamocha River Basin, the one which corresponds to 72 Municipalities of Boyaca and Santander Departments, due to the fact that is had good information area originating from diagnostic elaborated by INDERENA with the objective of formulating the Classification Plan and the Basin Managing. This Thesis consists of: 1. To identify all micro-basins; 2. To analyze energy demand on part of kernels of population seated in the study area; 3. To evaluate energy generating capacity of water currents and 4. As of the obtained results, to propose alternative for small hydroelectric plants design (PCH) according to defined needs

  19. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  20. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Science.gov (United States)

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  1. MODELING AND STUDY OF HYDROELECTRIC GENERATING SETS OF SMALL HYDRO POWER PLANTS WITH FREQUENCY-CONTROLLED PERMANENT MAGNET SYNCHRONOUS GENERATORS

    Directory of Open Access Journals (Sweden)

    R. I. Mustafayev

    2016-01-01

    Full Text Available Currently, the hydroelectric generating sets of small HPPs with Pelton turbines employ as their generating units conventional synchronous generators with electromagnetic excitation. To deal with the torque pulsatile behaviour, they generally install a supplementary flywheel on the system shaft that levels the pulsations. The Pelton turbine power output is adjusted by the needle changing water flow in the nozzle, whose advancement modifies the nozzle area and eventually – the flow. They limit the needle full stroke time to 20–40 sec. since quick shutting the nozzle for swift water flow reduction may result in pressure surges. For quick power adjustment so-called deflectors are employed, whose task is retraction of water jets from the Pelton turbine buckets. Thus, the mechanical method of power output regulation requires agreement between the needle stroke inside the turbine nozzles and the deflector. The paper offers employing frequency-controlled synchronous machines with permanent magnets qua generating units for the hydroelectric generating sets of small HPPs with Pelton turbines. The developed computer model reveals that this provides a higher level of adjustability towards rapid-changing loads in the grid. Furthermore, this will replace the power output mechanical control involving the valuable deflector drive and the turbine nozzle needles with electrical revolution rate and power output regulation by a frequency converter located in the generator stator circuit. Via frequency start, the controllable synchronous machine ensures stable operation of the hydroelectric generating set with negligibly small amount of water (energy carrier. Finally, in complete absence of water, the frequency-relay start facilitates shifting the generator operation to the synchronous capacitor mode, which the system operating parameter fluctograms obtained through computer modeling prove. 

  2. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  3. Economic aspects of hydroelectric power scheme rehabilitation

    International Nuclear Information System (INIS)

    Dupuy, M.

    1991-01-01

    As part of the management of a utility, it is necessary to check, beyond the technical aspect, the economic suitability of deciding whether to perform the maintenance or rehabilitation of an installation. The decision criteria involved are to be found within the framework of the utility's management system itself. After having set out the decision-making process of hydroelectric power station maintenance or rehabilitation, the document goes on to give a description of the economic advantage of such an operation. The latter is determined after having properly defined the overall cost of maintenance or rehabilitation: direct expenses and induced costs, and expected savings: economic performance, short and medium-term reduction of expenses as a result of the profitability and productivity of the rehabilitation. The profitability is calculated as the ratio between the economic balance and the amount of the operation. Productivity means the improvement of the utility's management indicators. The random aspect of savings and a simple method making it possible to integrate them into a calculation is mentioned, as well as the classification and aggregation of various operations of a similar nature that have to come into the budget requirements of the utility. (Author)

  4. Summary of operating experience in Swiss nuclear power plants 1993

    International Nuclear Information System (INIS)

    1994-07-01

    In 1993 the Swiss nuclear power plants produced their third highest combined annual output. The contribution to the total electricity generation in the country was close to 37%. Replacement of the steam generators in Beznau Unit 1 resulted in a longer than usual annual outage. For the other four units the availability figures were close to, or exceeded, those of previous years. The energy utilization was, however, lowered due to load reduction in autumn resulting from unusually high production by the hydro-electric power plants. The steam generator replacement at Beznau enabled an increase in electrical power of about 2% without increase in reactor power. With the approval of the Swiss government in December 1992, the output of the Muehleberg power plant was increased in two stages by a total of 10%. The application for an unlimited operating license for Beznau Unit 2, and for a power uprate at the Leibstadt power plant, are still pending. The average number of scrams at the Swiss plants remained stable, at less than one scram per reactor year. As a result of experience in the Swedish nuclear power plant at Barsebaeck, the suction strainers of the emergency core cooling systems of the boiling water reactors at Muehleberg and Leibstadt were replaced by strainers with larger surface areas. The re-inspection of crack indications previously detected in the core shroud of the Muehleberg reactor and the penetration tubes in the reactor pressure vessel closure head of Beznau revealed no growth during the intervening operating periods. Following the completion of installation activities during the annual outages at Beznau Unit 1, Goesgen and Leibstadt, all Swiss nuclear power plants are now equipped with filtered containment venting systems. (author) figs., tabs

  5. Efficiency analysis of hydroelectric generating plants: A case study for Portugal

    International Nuclear Information System (INIS)

    Barros, Carlos Pestana

    2008-01-01

    This paper estimates changes in total productivity, breaking this down into technically efficient change and technological change, by means of data envelopment analysis (DEA) applied to the hydroelectric energy generating plants of EDP - the Portugal Electricity Company. The aim of this procedure is to seek out those best practices that will lead to improved performance in the energy market. We rank the plants according to their change in total productivity for the period 2001-2004, concluding that some plants experienced productivity growth while others experienced a decrease in productivity. The implications arising from the study are that EDP should adopt an internal benchmark management procedure in order to evaluate the relative position of each hydroelectric generating plant and to adopt managerial strategies designed to catch up with the frontier of 'best practices'. As the frontier is shifting along the time, constant efforts are needed in this respect along the time. (author)

  6. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Science.gov (United States)

    2011-11-22

    ... Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD Hydroelectric LLC (transferor) and... Red Rock Hydroelectric Project, No. 12576, located on the Des Monies River in Marion County, Iowa...

  7. An approach to the investment analysis of small and medium hydro-power plants

    International Nuclear Information System (INIS)

    Forouzbakhsh, F.; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in 'Bookan, Iran' and SHPP in 'Nari, Iran'), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially

  8. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  9. The long term plan for the integration of nuclear power plants into the Turkish Electrical Power System

    International Nuclear Information System (INIS)

    Kutukcuoglu, A.

    1974-03-01

    The report covers in detail the study of the expansion of the Turkish Electric Power System for the period 1980-1987. Load forecast is done by sectors and regions and inter-regions power balances gave the basis for the high voltage network configurations. Expansion alternatives are defined giving priority to hydroelectric projects, to local resources and nuclear power plants concurrently with conventional plants (lignite and oil). Several reactor strategies are analysed with LWR, HWR, FBR and HTGR power plants. Present worth value method is used for comparison of alternatives and sensitivity analysis is done for those ranked in the first places. Load flow, transient stability and frequency deviation studies of the power system are studied carefully by means of A.C. calculator and digital computer codes in order to see the influence of the introduction of large-sized power plants (600-750MW(e)) and their location in the power system. A 600MW(e) nuclear plant in 1983 and a second one of 750MW(e) in 1987 should, it is found, be commissioned into the system. The economic optimization was done with two computer programmes developed by KFA (Juelich): IACO for fuelling nuclear plant and RESTRAPO for power system with high hydroelectric component. The report is bound in three volumes: Volume I: Summary and Conclusions; Volume II: System Planning; Volume III: Electrical Survey

  10. Small hydroelectric power development in India: a profile

    International Nuclear Information System (INIS)

    Bhattacharya, Partha

    1993-01-01

    Small hydroelectric power plants (SHPs) have a definite role to play in the contemporary energy scenario generally as a source for supplementing the electrical energy production and particularly in remote rural areas in meeting the energy requirements of isolated communities. SHPs practically do not produce any adverse impact.However, their success depends on the ingenuity of the planners and the designers, and more importantly the convection. Another dimension to the success is the participation and involvement of the beneficiaries of the project which are more relevant for the microhydro electric schemes in the remote areas. The major factor that influences the commercial success of the SHP is marketing. It should be given due emphasis. This necessitates the SHP development activities to be more pragmatic and relevant to the society needs; an approach which is programme-based, rather than a project-oriented, is needed. (author). 4 refs

  11. Implantation of hydroelectric power plants and the environmental licensing: the importance of the articulation among the electrical and environment sectors in Brazil; A implantacao de usinas hidreletricas e o processo de licenciamento ambiental: a importancia da articulacao entre os setores eletrico e de meio ambiente no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Facuri, Micheline Ferreira

    2004-07-01

    Hydroelectric power plants stand for the main generation source in Brazil. The basis of the national generator park installed capacity is the exploration of hydraulic potency when the Brazilian energetic die is observed. The atmosphere that the Brazilian electric sector is found now asks for new generator units. In this sense, it would decrease energy offer deficit risk, which collaborates to the electric energy offer expansion effort. This research aims to join and to comment on a group of data and information regarding to the process of implantation of hydroelectric power plants already bid. It includes up to date data on hydroelectric power plants bid since 1996. This data describe the main implications found in the enterprises that are late in their schedules. It shows that the greater the environmental management instruments incorporation in hydroelectric projects planning process, the greater the possibility of new hydraulic generation enterprises with better quality of environmental studies implantation. In this way, it makes even better the process of environmental licensing that could occur in a more adequate deadline. As a result, 28 - out of 54 - enterprises bid are found with environmental problems, which represent 43.30% of bestowed potency. It is possible to infer, thus, that there is a need of more interaction between the electric and the environmental sectors. After analyzing the results, it is concluded that the generation enterprises environmental licensing has been worrying the electric sector agents. This happens due to the need of refinement on environmental studies or due to the need of bureaucracy to get licenses - mainly regarding to judicial actions and environmental issues. Finally, the adequate identification of environmental licensing drags allows a more efficient process to hydroelectric power plants implantation, which generates more consistent and faster results. (author)

  12. Emergetic analysis of the electrolytic hydrogen production using the secondary energy from the Itaipu Hydroelectric Power Plant; Analise emergetica da producao de hidrogenio eletrolitico aproveitando a energia vertida nao turbinada da Usina Hidroeletrica de Itaipu

    Energy Technology Data Exchange (ETDEWEB)

    Agarussi, Maria Alessandra Silva Nunes; Espinola, Michel Osvaldo Galeano [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Planejamento de Sistemas Energeticos

    2006-07-01

    Due to the possibility of increase in the energy market in a few years and awareness of the necessity of using the secondary energy in hydroelectric power plants and also concerned about the environmental problems related to energy enterprises, the present paper develops the emergy analyses of electrolytic hydrogen production in the Itaipu Power Plant located in the countries of Brazil and Paraguay. The emergy analyses despite being unknown by the major people and technicians responsible for the development of Environmental Impacts Studies, named EIA/RIMAS in Brazil, represents a way to fulfill all requirements imposed by law and government and also an important manner to internalize externalities in the evaluation of all variables involved in the execution and maintenance of natural and artificial processes. Afterwards, this database can be used to be compared with other actual processes of producing and supplying energy, guiding stake holders when deciding where and how to implement and take advantage of available energy sources. This work aims to evaluate with emergetic criteria the research done by Antonio Carlos Fonseca Santos Jr.: Analysis of the Economic Feasibility of Hydrogen Production in Hydroelectric Power Plants: A Case Study at Itaipu. (author)

  13. Low-head hydro power

    Science.gov (United States)

    Lemer, E. J.

    1980-11-01

    With a view toward increasing the U.S. electric output, the Army Corps of Engineers has estimated that 55 GW can be obtained immediately from new capacity at existing dams and 40 GW more over the long term. Given the long lead times needed to build new dams, most interest has centered on the existing dams. The Corps of Engineers has established that 21 GW can be obtained from hydroelectric and 34 GW from nonpower dams. Existing hydroelectric sites are being expanded by the utilities, but exploitation of the nonpower dams will require governmental encouragement, because the vast majority are low-head sites (dams less than 40 m high). In the present paper, the question of economics and national policy is examined. The advantages which would accrue from substituting axial turbines for the Kaplan turbine are noted.

  14. Numerical and field tests of hydraulic transients at Piva power plant

    International Nuclear Information System (INIS)

    Giljen, Z

    2014-01-01

    In 2009, a sophisticated field investigation was undertaken and later, in 2011, numerical tests were completed, on all three turbine units at the Piva hydroelectric power plant. These tests were made in order to assist in making decisions about the necessary scope of the reconstruction and modernisation of the Piva hydroelectric power plant, a plant originally constructed in the mid-1970s. More specifically, the investigation included several hydraulic conditions including both the start-up and stopping of each unit, load rejection under governor control from different initial powers, as well as emergency shut-down. Numerical results were obtained using the method of characteristics in a representation that included the full flow system and the characteristics of each associated Francis turbine. The impact of load rejection and emergency shut-down on the penstock pressure and turbine speed changes are reported and numerical and experimental results are compared, showing close agreement

  15. An approach to the investment analysis of small and medium hydro-power plants

    Energy Technology Data Exchange (ETDEWEB)

    Forouzbakhsh, F. [University of Tehran (Iran). Faculty of Engineering; Hosseini, S.M.H. [Islamic Azad University, Tehran (Iran). Faculty of Engineering; Vakilian, M. [Sharif Institute of Technology, Tehran (Iran). Faculty of Electrical Engineering

    2007-02-15

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in ''Bookan, Iran'' and SHPP in ''Nari, Iran''), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially. (author)

  16. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-08-03

    ... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the... considered timely only if it is received in the office of the Lease of Power Privilege Coordinator by or...

  17. An investigation into the potential of low head hydro power in Northern Ireland for the production of electricity

    Science.gov (United States)

    Redpath, David; Ward, Michael J.

    2017-07-01

    The maximum exploitable potential for low head hydroelectric sites (gross head≤10 m) in Northern Ireland (NI) was determined as 12.07 MW using a simple payback analysis for 304 potential sites investigated to derive a classification scheme in terms of economic viability. A techno-economic analysis with validated numerical models from previous research estimated the capital investment required for the development of a hydroelectric plant, using the low head Michell-Banki cross flow turbine, for the 304 sites investigated. The number of potentially viable sites in NI for low head hydro ranged from 198 to 286 with an estimated installed capacity ranging from 11.95 to 12.05 MW. Sites with a limited installed capacity were not economically viable unless increased government support in the form of longer term (25-50 years) low interest loans as well as the current (Renewables Obligations Certificates) Renewables Obligation Certificates scheme is provided and sustained.

  18. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Science.gov (United States)

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  19. The hydroelectric power plant of the Widemann cotton mill (San Germano Chisone, Turin: perspectives of knowledge, conservation and enhancement.

    Directory of Open Access Journals (Sweden)

    Riccardo Rudiero

    2017-12-01

    Full Text Available Alpine valleys Pellice, Chisone and Germanasca, at whose feet lies the town of Pinerolo (TO, were among the first most industrialized areas of the Savoy state, vocation still spotted in the wide network of material evidences, such as production complexes, social facilities built for the working class, water channeling, electrification system. About the latter, there are still many active structures in the production of electricity. Some of them are dismantling, others are in operation, others are in the process of being transformed. This contribution will be focused on the case of the hydroelectric power plant of Widemann cotton mill in San Germano Chisone (TO, where the analysis of the existing structures and a diachronic reading of the archive documents has allowed to reconstruct its history and has provided the basis for some suggestions related to its conservation and enhancement.

  20. Fish and hydroelectricity

    International Nuclear Information System (INIS)

    Zorpette, G.

    1990-01-01

    This paper reports on the problems that hydroelectric plants have regarding fish populations. The utilities that operate these plants are finding that accommodating migrating fish presents unique engineering challenges, not the least of which involves designing and building systems to protect fish species whose migratory behavior remains something of a mystery. Where such systems cannot be built, the status of hydroelectric dams may be in doubt, as is now the case with several dams in the United States. A further twist in some regions in the possibility that certain migratory fish will be declared threatened or endangered-a development that could wreak havoc on the hydroelectric energy supply in those regions

  1. Use of cost benefit analysis methodology in the meaning of motorization level from small and medium hydroelectric power plants

    International Nuclear Information System (INIS)

    Mazzon, J.G.; Simoes, N.S.; Ramos, D.S.; Ishida, S.

    1989-01-01

    The technical and economic justifications that bringing the waterfall division reformulation between Lucas Nogueira Garcez Plant and Capivara Plant in Paranapanema River (Brazil) are described, including a comparative economic of Canoas (Alta), Canoas I and Canoas II passages, motorization study and energetic benefits. The reasons of the Bulbo turbines choice and dimensioning definition of the installed power by the new reference economic parameters are also presented. (C.G.C.). 5 refs, 11 tabs

  2. The hydroelectric power market in the United States

    International Nuclear Information System (INIS)

    2002-01-01

    The second-largest producer of hydroelectric power in the world is the United States, right after Canada. In the United States, 7.1 per cent of net electricity generation was attributed to hydroelectric power in 2000, which totalled 269 terawatt hours (TWh). Aging facilities, outdated technology in some facilities, a cumbersome licensing process, and increasing environmental demands from interest groups for the preservation of river systems and surrounding wildlife challenge the industry. Pacific Coast states, especially California, were faced with electric power shortages during the summer of 2001, due to low market prices, high power usage among consumers and drought. The problems with the deregulation of the electricity market were brought to light by these shortages. Legislation to restructure the electric power industry in 25 states had not been enacted as of January 2002. The purchase of more power from both Canada and the Mexico is being considered by the government of the United States, as is the creation of a national power grid to allow for power transmission throughout the country. The Canada-United States energy trade might be affected by such a move, and result in project construction opportunities for Canadian companies. Renewable energy sources must be responsible for the generation of 10 per cent of power generation levels by 2020, on a gradual basis as mandated by law. By 2005, New York City must purchase 10 per cent of its power from renewable energy sources, reaching 20 per cent by 2010. The repair and replacement of aging dam equipment, the development of advanced turbine technology to protect fish stocks and water quality, dam removal, the construction of power lines are all opportunities open to Canadian companies. 60 refs., 5 tabs

  3. Environmental Impact Report from Santa Rita Hydroelectric Power Plant (Minas Gerais State - Brazil): technical strategic for its elaboration; Relatorio de Impacto Ambiental da Usina Hidreletrica da Santa Rita (MG): estrategica tecnica para sua elaboracao

    Energy Technology Data Exchange (ETDEWEB)

    Souza, J.A. de; Marques Neto, F P [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1990-12-31

    The steps for developing the technical strategies used on the elaboration of Environmental Impact Report from Santa Rita Hydroelectric Power Plant, Minas Gerais State, are described, including the influence area, technical requirements, impact identification, technical selection of mitigative measures, impact meaning and strategy for evaluating the identified impacts. (C.G.C.).

  4. An evaluation pattern for antimacrofouling procedures: Limnoperna fortunei larvae study in a hydroelectric power plant in South America.

    Science.gov (United States)

    Darrigran, Gustavo; Damborenea, Cristina; Greco, Nancy

    2007-11-01

    The effects of global change and globalization of trade on the biosphere spur an increase in bioinvasions and their subsequent impact on ecosystems. Continental invading bivalves are important because of their impact on artificially-constructed structures. Limnoperna fortunei was first found in the Neotropical region in 1991. Since then it has dispersed upstream in the Plata and Guaíba basins at a rate of 240 km y(-1). This species causes macrofouling in a manner similar to that caused by Dreissena polymorpha. This paper describes the biology of L. fortunei larvae from a hydroelectric power plant in South America. We suggest the importance of knowing the biology of the invading species and the need to consider the settlement patterns and densities of larvae in each of the sectors of the facility in order to achieve a sustainable prevention/control of macrofouling. This study acquires a global significance under the assumption that L. fortunei will eventually invade North America and Europe.

  5. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  6. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  7. Dataset of long-term monitoring of ground-dwelling ants (Hymenoptera: Formicidae) in the influence areas of a hydroelectric power plant on the Madeira River in the Amazon Basin.

    Science.gov (United States)

    Fernandes, Itanna O; de Souza, Jorge L P

    2018-01-01

    Biodiversity loss is accelerating rapidly in response to increasing human influence on the Earth's natural ecosystems. One way to overcome this problem is by focusing on places of human interest and monitoring the changes and impacts on the biodiversity. This study was conducted at six sites within the influence area of the Santo Antônio Hydroelectric Power Plant in the margins of the Madeira River in Rondônia State. The sites cover a latitudinal gradient of approximately 100 km in the Brazilian Amazon Basin. The sampling design included six sampling modules with six plots (transects) each, totaling 30 sampling plots. The transects were distributed with 0 km, 0.5 km, 1 km, 2 km, 3 km and 4 km, measured perpendicularly from the river margin towards the interior of the forest. For sampling the ground-dwelling ants, the study used the ALL (ants of the leaf litter) protocol, which is standardized globally in the inventories of ant fauna. For the purpose of impact indicators, the first two campaigns (September 2011 to November 2011) were carried out in the pre-filling period, while campaigns 3 to 10 (February 2012 to November 2014) were carried out during and after the filling of the hydroelectric reservoir. A total of 253 events with a total of 9,165 occurrences were accounted during the monitoring. The ants were distributed in 10 subfamilies, 68 genera and 324 species/morphospecies. The impact on ant biodiversity during the periods before and after filling was measured by ecological indicators and by the presence and absence of some species/morphospecies. This is the first study, as far as we know, including taxonomic and ecological treatment to monitor the impact of a hydroelectric power plant on ant fauna. Until recently, most studies conducted on hydroelectric plants, located in the Amazon Basin, were carried out after the implementation of dams in order to assess their impacts on the environment and biodiversity (Benchimol and Peres 2015, Latrubesse et al. 2017

  8. constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    KEYWORDS: Constraints; craftsmen; funds; highlands; hydroelectric. INTRODUCTION ... MATERIAL AND METHODS. 1.1 Physical ... (Bamougoum; Bapi; Batotcha) are due to the use ... water very often escapes from the air vent because of its .... The funds raised will remedy ... Graw-Hill Book Company New York,. USA.

  9. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  10. Decision on thermal power plant can be taken this spring

    International Nuclear Information System (INIS)

    Haga, I.

    1978-01-01

    Towards the end of the 1960s it appeared that nuclear power would be the natural successor to hydroelectric power, as the latter became less attractive for further exploitation, reinforced by environmentalist opposition to several proposed hydroelectric schemes. Conventional thermal power was also considered, but one proposed stand-by plant was rejected in 1971 largely because of environmental considerations. Preliminary planning and PR information on nuclear power in the early 1970s aroused considerable opposition and a governmental commission was appointed in 1975-6 to evaluate the question of reactor safety and transport and disposal of radioactive waste, to report in 1978. It is therefore not possible to count on nuclear power as a supplement until the end of the 1980s at the earliest. Gas-fired thermal power is environmentally attractive, but at present no gas fields have been found which make this economic. Oil-fired power is quite feasible, but no political decision has yet been taken. Coal fuel, based on the Spitzbergen mines has recently become more interesting, and small power plants for the extreme north of Norway are under consideration. Finally it is pointed out that nuclear power is safer than generally assumed while fluidised bed combustion of coal in a combined steam-gas turbine plant will lead to very high thermal efficiencies. (JIW)

  11. Spatial and temporal abundance of three sylvatic yellow fever vectors in the influence area of the Manso hydroelectric power plant, Mato Grosso, Brazil.

    Science.gov (United States)

    Ribeiro, A L M; Miyazaki, R D; Silva, M; Zeilhofer, P

    2012-01-01

    Human biting catches of sylvatic yellow fever (SYF) vectors were conducted at eight stations in the influence area of the Manso hydroelectric power plant (Central Brazil) in sampling campaigns every 2 mo from July 2000 to November 2001. In total, 206 individuals were captured and classified as one of three species important for the transmission of SYF in Mato Grosso state: Haemagogus (Haemagogus) janthinomys (Dyar, 1921); Haemagogus (Conopostegus) leucocelaenus (Dyar & Shannon, 1924); and Sabethes (Sabethoides) chloropterus (Humboldt, 1819). The highest vector abundance was observed during the rainy season (November through March) and SYF vectors were present in all sampling points throughout the year, mainly in riparian and shadowed transitional forests at shadowed ramps.

  12. Expanding the functional significance of automated control systems for the production process at hydroelectric plants

    International Nuclear Information System (INIS)

    Vasil'ev, Yu.S.; Kononova, M.Yu.

    1993-01-01

    Automated control systems for the production process (ACS PP) have been successfully implemented in a number of hydroelectric plants in the Russian Federation. The circle of problems that can be solved using ACS PP can be conditionally divided into two classes: on-line/technological control, and production-technological control. This article describes successes and future directions for the solution of these two classes of problems. From the discussion, it is concluded (1) that the data base for existing ACS PP at hydroelectric plants can be successfully employed as points for monitoring the conservation of an environment of local significance; (2) that is is expedient to discuss the problem with organizations, including local control groups interested in the development of territorial-basin systems for ecological monitoring; and (3) that the initiative in creating local territorial-basin support points for monitoring should emanate from guidelines for hydroelectric plants with ACS PP. 3 refs., 2 figs

  13. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P; Croci, S; Ernst, J -R

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  14. Simulation of hanging dams downstream of Ossauskoski power plant

    Energy Technology Data Exchange (ETDEWEB)

    Aaltonen, J.; Huokuna, M. [Finnish Environment Inst., Helsinki (Finland); Severinkangas, K.; Talvensaari, M. [Kemijoki Oy, Rovaniemi (Finland)

    2008-07-01

    Sixteen power plants have been constructed along Finland's Kemijoki River for hydroelectric power production. The Ossauskoski facility has recently undergone major renovations and upgrade, making it the sixth largest hydroelectric power plant in Finland, with a new capacity of 124 MW and an annual energy output of 501 GWh. The increase in power output and discharge may cause changes in ice conditions downstream of the power plant. The section of the river is already subjected to frazil ice problems and hanging dam formation. Discharges and adverse effects of frazil ice phenomena are likely to increase due to climate change, resulting in harm for hydropower production and the environment, particularly in flow regulated rivers where winter discharges are higher than natural discharges. As such, a study was launched to investigate a dredge plan suggested by by the electric utility Kemijoki Oy. The project involved mapping the river bed topography to identify the location and extent of hanging dams. A sounding device and ground penetrating radar was used to find the thaw regions in the ice cover. The JJT numerical river ice model was effectively used to study the effect of hanging dams on water levels. However, the ice bridging phenomena was not modelled in a reliable way by the JJT model and will be modelled in the future using the CRISSP2D numerical model. 5 refs., 11 figs.

  15. Small-medium sized nuclear coal and gas power plant: A probabilistic analysis of their financial performances and influence of CO2 cost

    International Nuclear Information System (INIS)

    Locatelli, Giorgio; Mancini, Mauro

    2010-01-01

    Nations or regions with limited electrical grid and restricted financial resources are a suitable market for small medium power plants with a size of 300-400 MWe. The literature presents several comparisons about the economics of large power plants (of about 1000 MWe); however there are not probabilistic analysis regarding the economics of small medium power plants. This paper fills this gap comparing, with a Monte Carlo evaluation, the economical and financial performances of a nuclear reactor, a coal fired power plant and a combined cycle gas turbine (CCGT) of 335 MWe. The paper aims also to investigate the effect of the carbon tax and electrical energy price on the economics of these plants. The analysis show as, without any carbon tax, the coal plant has the lowest levelised unit electricity cost (LUEC) and the highest net present value (NPV). Introducing the carbon tax the rank changes: depending on its amount the first and the nuclear after becomes the plant with lower LUEC and highest NPV. Therefore, the uncertainty in the carbon tax cost increases the risk of investing in a coal plant above the level of the new small medium reactor.

  16. Frequency Response Analysis of Hydroelectric Power Plants with Influence From a Non-Linearized Frictional Damping and the Turbine Characteristics

    Directory of Open Access Journals (Sweden)

    H. Brekke

    1985-01-01

    Full Text Available The main purpose of the dissertation has been to establish a complete stability analysis of a hydroelectric power plant. The most important part in this study has been to establish a theory for the damping of oscillatory flow in tunnels and pipes. The influence of the turbine characteristics is also important and has been included by differentiation of the turbine equation. The partial derivative values can be found by means of the characteristic diagram of the turbine. Special attention is paid to establishing an empirical friction function for tunnels with rough walls. The author has based his theory on experimental tests carried out for damping of sea waves on rough beds, and the friction factor is a function of both frequency, amplitudes, cross section area and roughness of the wall (Jonsson 1978. Further, the damping of oscillations in shafts leading to tunnels taking into account the mean velocity in the tunnel has been established.

  17. Bulb turbine operating at medium head: XIA JIANG case study

    Science.gov (United States)

    Loiseau, F.; Desrats, C.; Petit, P.; Liu, J.

    2012-11-01

    With lots of references for 4-blade bulb turbines, such as these of Wu Jin Xia (4 units - 36.1 MW per unit - 9.2 m rated head), Chang Zhou (15 units - 46.7 MW per unit - 9.5 m rated head) and Tong Wan (4 units - 46.2 MW per unit - 11 m rated head), ALSTOM Power Hydro is one of the major suppliers of bulb turbines operating under medium head for the Chinese market. ALSTOM Power Hydro has been awarded in November 2010 a contract by Jiang Xi Province Xia Jiang Water Control Project Headquarters to equip Xia Jiang's new hydropower plant. The power dam is located on the Gan Jiang river, at about 160 km away from Nan Chang town in South Eastern China. The supply will consist in 5 bulb units including the furniture of both the turbine and its generator, for a total capacity of 200 MW, under a rated net head of 8.6 m. The prototype turbine is a 7.8 m diameter runner, rotating at 71.4 rpm speed. For this project, ALSTOM has proposed a fully new design of 4-blade bulb runner. This paper outlines the main steps of the hydraulic development. First of all, a fine tuning of the blade geometry was performed to enhance the runner behaviour at high loads and low heads, so that to fulfill the demanding requirements of efficiencies and maximum output. The challenge was also to keep an excellent cavitation behaviour, especially at the outer blade diameter in order to avoid cavitation erosion on the prototype. The shape of the blade was optimized by using the latest tools in computational fluid dynamics. Steady state simulations of the distributor and the runner were performed, in order to simulate more accurately the pressure fields on the blade and the velocity distribution at the outlet of the runner. Moreover, draft tube computations have been performed close to the design point and at higher loads. Then, a model fully homologous with the prototype was manufactured and tested at ALSTOM's laboratory in Grenoble (France). The model test results confirmed the predicted ones: the

  18. What are the stakes of the hydroelectric power? Supplement: report on the renewable energies

    International Nuclear Information System (INIS)

    2003-01-01

    The document presents the regulation and the stakes concerning the hydroelectricity development in France: contribution to the greenhouse effect fight, the environment preservation, possible uses. It proposes then, a grid of a socio-economical evaluation of the projects. In this framework, the impacts of the little hydroelectric power and the possible corrective measures are described. (A.L.B.)

  19. A nuclear power plant for Lima city. Is it a real alternative?

    International Nuclear Information System (INIS)

    Romani A, J.

    1992-01-01

    At the present, Peru has an installed electricity capacity of 4112 MW from which the 80% comes from hydroelectric sources and other 20% from thermal sources. Lima city concentrates the larger industrial activities and uses 95% of the hydro-electric supply the 5% comes from thermal origin. This situation provokes an energetic vulnerability to Lima, a city with more them 10 million of inhabitants, because climatic changes and the electric towers destruction. In the 1989-1992 period lack of energy meant economic losses for about US$ 2 100 000. To solve this problem the government is building a 300 MW thermal station. This alternative means a low investment for Kw installed but high production costs. Additionally the installation of the plant in Lima will increase the environmental contamination due to emission of about 20000 TM/year of SOx and 7500 TM/year of NOx. The research study recommends as a solution the diversification of energy sources, avoiding dependence of the hydro-electrical ones. In the same form it suggests that the next 300 MW power station to be installed for about 1998 would be a nuclear power plant but not thermal one. It also makes a revision of the new designs for nuclear power plants called safe inherently which design and construction philosophy avoid the possibility of accidents like Chernobyl. (author). 15 refs., 5 tabs., 13 figs

  20. Simulation technology for power plants

    International Nuclear Information System (INIS)

    Kuwabara, Kazuo; Yanai, Katsuya.

    1988-01-01

    In the simulation of nuclear power stations, there are the simulation for the training of plant operation, the plant simulation for analyzing the operation of an electric power system, the simulation for controlling a core, the simulation for the safety analysis of reactors, the simulation for the design analysis of plants and so on as the typical ones. The outline and the technical features of these simulations are described. With the increase of capacity and complexity of thermal power plants, recently the automation of operation has advanced rapidly. The chance of starting up and stopping plants by operators themselves is few, and the chance of actually experiencing troubles also is few as the reliability of plants improved. In order to maintain the ability of coping with plant abnormality, an operation supporting system is strongly demanded. Operation training simulators and used widely now, and there are the simulators for analysis, those of replica type, those of versatile compact type and so on. The system configuration, modeling techniques, training function and others of the replica type are explained. In hydroelectric plants, the behavior of water in penstocks, the characteristics of water turbines, the speed control system for water turbines and the characteristics of generators become the main subjects of simulation. These are described. (Kako, I.)

  1. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  2. Structure dynamics of a fish community over ten years of formation in the reservoir of the hydroelectric power plant in upper Uruguay River.

    Science.gov (United States)

    Schork, G; Zaniboni-Filho, E

    2017-11-01

    The objective of this study was to evaluate the structure of the fish assemblage in the ten years following the closing of the lake of the Itá Hydroelectric Power Plant. Seasonal collections were conducted from 2001 to 2010. During this period, 44,834 fish were captured, totaling 3,818.01 kg, among 8 orders, 24 families and 84 species. In general, profound changes were not observed in the fish assemblage in the ten years after the formation of the Itá lake. Few species changed in dominance over time, while many were rare in the environment. The ichthyofauna in the reservoir was dominated by small and medium size opportunist species that conduct short or no migratory movements. Among the most abundant, six species were responsible for more than 50% of the numeric representation: Steindachnerina brevipinna, Astyanax fasciatus, Apareiodon affinis, Hypostomus isbrueckeri, Iheringichthys labrosus and Loricariichthys anus. The increase in the representation of the later species stood out. The biomass was dominated by Steindachneridion scriptum, Prochilodus lineatus, I. laborsus, Schizodon nasutus, Hoplias malabaricus, Acestrorhynchus pantaneiro, Hoplias lacerdae, H. isbrueckeri and L. anus. Despite the presence of large migrators in the region of the reservoir, their vulnerability was revealed by the low numeric abundance and accidental capture. The k-dominance curve of numerical abundance and biomass indicates a moderately disturbed community, in which the representation of small species was also important to the amounts of biomass.

  3. Fuzzy logic approach for energetic and economic evaluation of hydroelectric projects

    International Nuclear Information System (INIS)

    Iliev, Atanas M.

    2003-01-01

    A mathematical model for energetic and economic evaluation of hydroelectric projects is developed. The main advantage of the proposed methodology is that the model considers uncertainty and vagueness which appears during the decision making process. Due to modeling of variables that are non statistical in their character, fuzzy logic approach is fully incorporated in the model. The first step in energetic evaluation of the hydro power projects is determination of the characteristic of the efficiency of the units to be installed in hydro power plants. For this purpose the model which uses the best characteristics of Artificial Network Fuzzy Inference System (ANFIS) is applied. The method is tested on real systems: HPP Tikves- the power plant in operation and HPP Kozjak - the power plant in construction. The results obtained from practical implementation show that the proposed approach gives superior results than classical polynomial approximation. The model for determining the consumption characteristic of hydro power plant is developed by Sugeno Fuzzy Logic System with polynomials in the consequent part of the rules. Model takes into account the variable gross head of HPP, as well as, the number of units which will be in operation for given output. Modeling of the gross head and power output are performed by expert's design membership functions. This model is practically applied on HPP Tikves for determination of the consumption characteristic for several gross head. The plausible yearly production of electricity from hydro power project, which is important for estimation of the benefit from the project, is calculated by mixed fuzzy-statistical model. hi this approach fuzzy set of the inflow is constructed according to the statistical parameters. The calculation of the production of electricity is realized for a several hydrological conditions which are described by linguistic variables. Finally, Mamdani Fuzzy Inference System with fuzzy number in consequent part

  4. Hydroelectric power plant with variable flow on drinking water adduction

    Science.gov (United States)

    Deaconu, S. I.; Babău, R.; Popa, G. N.; Gherman, P. L.

    2018-01-01

    The water feeding system of the urban and rural localities is mainly collected with feed pipes which can have different lengths and different levels. Before using, water must be treated. Since the treatment take place in the tanks, the pressure in the inlet of the station must be diminished. Many times the pressure must be reduced with 5-15 Barr and this is possible using valves, cavils, and so on. The flow capacity of the water consumption is highly fluctuating during one day, depending on the season, etc. This paper presents a method to use the hydroelectric potential of the feed pipes using a hydraulic turbine instead of the classical methods for decreasing the pressure. To avoid the dissipation of water and a good behavior of the power parameters it is used an asynchronous generator (AG) which is coupled at the electrical distribution network through a static frequency converter (SFC). The turbine has a simple structure without the classical devices (used to regulate the turbine blades). The speed of rotation is variable, depending on the necessary flow capacity in the outlet of the treatment station. The most important element of the automation is the static frequency converter (SFC) which allows speeds between 0 and 1.5 of the rated speed of rotation and the flow capacity varies accordingly with it.

  5. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  6. Design and construction of landslide preventive construction at Yamasubara hydroelectric power plant site. Yamasubata hatsudensho chiten ni okeru jisuberi taisaku koji no sekkei seko ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Takase, H; Ito, M; Sakata, M [The Kyushu Electric Power Co. Inc., Fukuoka (Japan)

    1993-07-30

    This paper reports the design and construction of landslide preventive construction at the site of the Yamasubara hydroelectric power plant (with a maximum output of 40,700 kW) and the result of slope stability verification after completion of the construction. The moderate slope on top of the primary slide has sands presumed to be colluvial deposit distributed with a depth of 10 m or more, where occurrence of a secondary slip was feared as triggered by the primary slide. The power plant protective constructions consisted of concrete walls to protect the entire power plant including buildings, and falling stone protective fences installed around the surge tanks. The temporary measures were so set that groundwater levels are lowered to a level that can assure the slide safety factor of 1.0 or more by means of drain boring using the down-the-hole hammer type. The permanent protective construction used rock anchors that are superior in constructability and economy. The stability of sliding slope faces was verified to confirm effects of the protective constructions. The verification included observations of groundwater level behavior, water well-up from drain holes, and movements in the slopes. The result showed that the protective constructions have give sufficient effects. Continued slope stability control is important. 16 figs., 7 tabs.

  7. Energy operation optimization of Rio Paranapanema power plants; Otimizacao da operacao energetica das usinas do Rio Paranapanema

    Energy Technology Data Exchange (ETDEWEB)

    Soares Filho, Secundino; Cicogna, Marcelo Augusto [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Eletrica e Computacao; Carneiro, Adriano Alber de Franca Mendes; Silva Filho, Donato da [Sao Paulo Univ., Sao Carlos, SP (Brazil). Escola de Engenharia; Lopes, Joao Eduardo Goncalves [Sao Paulo Univ., SP (Brazil). Escola Politecnica; Born, Paulo Henrique S.; Chaves, Jose Roberto de A.; Laudanna, Paulo Ricardo [Duke Energy International Geracao Paranapanema, PR (Brazil)

    2000-07-01

    This work presents the developed nonlinear optimization model and verify the results for the hydroelectric power plants cascade on the Paranapanema river. The power plants optimized operation is checked out under the average hydrological conditions and the represented by the known flow history ones.

  8. Exploitation of hydropower potentials. EnBW operates run-of-river power plants in Baden-Wuerttemberg; Wasserkraft-Potenziale ausschoepfen. EnBW betreibt in Baden-Wuerttemberg Laufwasserkraftanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Frey, Martin

    2013-06-01

    For about 100 years power is generated from hydroelectric power on the river Neckar (Federal Republic of Germany). A total hydropower capacity of about 100 megawatts already is installed at the Neckar river. In the Federal State Baden-Wuerttemberg there is certainly the potential for the construction and modernization of hydroelectric power plants. Under this aspect, the contribution under consideration reports on the reconstruction of the run-of-river power plant Schwabenheim nearby Heidelberg (Federal Republic of Germany).

  9. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  10. Extraordinary repair in Madunice Hydro Power Plant

    International Nuclear Information System (INIS)

    Vrablik, R.; Zacik, P.

    2007-01-01

    A New Year did not begin very well for Madunice hydroelectric power plant. On 3 January, 2007 during operation, the TG 1 turbine set suffered sudden large impacts and inadmissible vibration of the machine while in the secondary regulation regime. The attending personnel had to shut down the turbine and discover the cause of the failure. The reinstatement of the TG 1 turbine was realised during 15 days in continual regime because TG 1 turbine is back-up power supply for the Bohunice NPP. (author)

  11. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  12. Application of total quality tools in the operational process modernization and optimization of large hydroelectric power plants; Aplicacao de ferramentas da qualidade total na modernizacao e otimizacao de processos operacionais de grandes usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Potenza, Luiz Frederico; Kassem, Faisal Ali; Medlo, Gerson Ricardo; Santos, Valdemir Chalito dos [Companhia Paranaense de Energia (COPEL), Capitao Leonidas Marques, PR (Brazil). Superintendencia de Gerencia da Manutencao. Area de Operacao e Manutencao Salto Caxias]. E-mail: potenza@mail.copel.br

    1998-07-01

    This work highlights a practical example of Total Quality tools application, and as the institutional changes advances, the necessity of being better and more competitive becomes evident. By using Total Quality Control tools in the modernization and optimization of operational processes for large hydroelectric power plants of the COPEL-Brazil this work contributes for the continuous increasing of the customers satisfaction and the profitability of the company.

  13. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P.; Croci, S.; Ernst, J.-R.

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  14. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Science.gov (United States)

    2010-06-02

    ... associated with the Dallas Creek Project; and the anticipated return on investment. If there are additional... entity to develop hydroelectric power at Ridgway Dam, and power purchasing and/or marketing... and interested entities to discuss Western's potential marketing of hydropower. FOR FURTHER...

  15. Testing of an acoustic smolt deflection system, Blantyre hydroelectric power scheme

    International Nuclear Information System (INIS)

    1996-01-01

    The aim of this study was to test the effectiveness of an underwater acoustic barrier as a means of preventing the entry of salmon (Salmo salar) and sea trout (Salmo trutta) smolts and other fish into the water intake of a hydro-electric power (HEP) station. A secondary objective was to measure the injury rate of fish passed through the turbine, so that the risk to any fish that penetrated the acoustic barrier could also be determined. The test site, which was a 575kW Kaplan plant located at Blantyre on the R. Clyde, Lanarkshire, was selected as being representative of run-of-river sites currently being developed under the Government's NFFO (Non-Fossil Fuel Obligation) and SRO (Scottish Renewables Order) schemes. A further objective was to disseminate information arising from the project to the scientific and HEP community. (author)

  16. Pumped storage hydroelectric power plant Cierny Vah

    International Nuclear Information System (INIS)

    2006-01-01

    This leaflet describes the Enterprise Cierny Vah Pumped storage hydropower plants of the joint stock company Slovenske elektrarne, a.s. (Cierny Vah PSHP). Cierny Vah PSHP has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system (ES). It is mainly the pumped storage hydro power plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation but especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control,...) gave way to dynamic functions which gained greater importance (sudden load changes control of ES, immediate meeting of the daily load diagram, frequency control and outputs given in ES, etc.) After interconnection of our ES with the UCPTE West European association in which there are besides other things, the strict criteria for observing balance of outputs, the main functions of PSPs are as follows: 1. Dynamic services for ES 2. Dispatching reserve for the fall out of the greatest ES block 3. Observing the foreign cooperation balance agreed 4. Compensation of peaks and also of sudden daily load diagram reductions. All the work is divided into four parts from the building point of view: The upper reservoir is an artificial one without the natural water inflow, built by excavation and slope on an Unknown elevation more than 1.150 m above sea level. A leading slope with a gradient 1:2 and a bottom of the reservoir

  17. A model optimization for pre-dispatch among the hydroelectric generator unities; Um modelo de otimizacao para pre-despacho entre as unidades geradoras de hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Colnago, Glauber R.; Correia, Paulo B. [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mails: grcolnago@fem.unicamp.br; pcorreia@fem.unicamp.br

    2006-07-01

    This work proposes a mixed integer nonlinear programming model to pre-dispatch of a hydroelectric power plant. In the model we want to minimize the losses in the electricity generation with conditions of electricity demand, operational prohibited zones and units' efficiency data. The Xingo Hydroelectric Power Plant was utilized in the mode tests. The solver used was Lingo 8.0. (author)

  18. Analysis of near optimum design for small and medium size nuclear power plants

    International Nuclear Information System (INIS)

    Ahmed, A.A.

    1977-01-01

    Market surveys in recent years have shown that a significant market would exist among the developing nations of the world for nuclear power plants that would be classified as small to medium sized, provided that these small plants could produce electricity at a unit price comparable to that of equivalent sized fossil fired plants. Nuclear plants in the range of 100 MWe to 500 MWe would fit more effectively into the relatively smaller grids of most developing nations than would the 900 MWe to 1300 MWe units now being constructed in the large industrial nations. Worldwide re-evaluation of the worth of fossil fuels has prompted a re-examination of the competitive position of small to medium sized nuclear generating units compared to comparable fossil fired units, especially in the context of units specifically optimized for the size range of interest, rather than of designs that are simply scaled down versions of the currently available larger units. Since the absolute cost of electricity is more sensitive to external factors such as cost of money, national inflation rate and time required for licensing and construction than to details of design or perhaps even to choice of fuels, and since the cost of electricity generated in small to medium sized fossil fired units is periodically compared to that of scaled down versions of conventional large nuclear units, the point of view taken here is one of comparing the relative generating costs of smaller nuclear units of optimum design with the corresponding costs of scaled down versions of current large nuclear generating units

  19. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  20. Bulb turbine operating at medium head: XIA JIANG case study

    International Nuclear Information System (INIS)

    Loiseau, F; Desrats, C; Petit, P; Liu, J

    2012-01-01

    With lots of references for 4-blade bulb turbines, such as these of Wu Jin Xia (4 units – 36.1 MW per unit – 9.2 m rated head), Chang Zhou (15 units – 46.7 MW per unit – 9.5 m rated head) and Tong Wan (4 units – 46.2 MW per unit – 11 m rated head), ALSTOM Power Hydro is one of the major suppliers of bulb turbines operating under medium head for the Chinese market. ALSTOM Power Hydro has been awarded in November 2010 a contract by Jiang Xi Province Xia Jiang Water Control Project Headquarters to equip Xia Jiang's new hydropower plant. The power dam is located on the Gan Jiang river, at about 160 km away from Nan Chang town in South Eastern China. The supply will consist in 5 bulb units including the furniture of both the turbine and its generator, for a total capacity of 200 MW, under a rated net head of 8.6 m. The prototype turbine is a 7.8 m diameter runner, rotating at 71.4 rpm speed. For this project, ALSTOM has proposed a fully new design of 4-blade bulb runner. This paper outlines the main steps of the hydraulic development. First of all, a fine tuning of the blade geometry was performed to enhance the runner behaviour at high loads and low heads, so that to fulfill the demanding requirements of efficiencies and maximum output. The challenge was also to keep an excellent cavitation behaviour, especially at the outer blade diameter in order to avoid cavitation erosion on the prototype. The shape of the blade was optimized by using the latest tools in computational fluid dynamics. Steady state simulations of the distributor and the runner were performed, in order to simulate more accurately the pressure fields on the blade and the velocity distribution at the outlet of the runner. Moreover, draft tube computations have been performed close to the design point and at higher loads. Then, a model fully homologous with the prototype was manufactured and tested at ALSTOM's laboratory in Grenoble (France). The model test results confirmed the predicted

  1. Research on vitrification technology to immobilize radioactive sludge generated from Fukushima Daiichi power plant. Enhanced glass medium

    International Nuclear Information System (INIS)

    Amamoto, Ippei; Kobayashi, Hidekazu; Kitamura, Naoto; Takebe, Hiromichi; Mitamura, Naoki; Tsuzuki, Tatsuya; Fukayama, Daigen; Nagano, Yuichi; Jantzen, Tatjana; Hack, Klaus

    2016-01-01

    The search for an enhanced glass medium to immobilize the sludge at the Fukushima Daiichi Nuclear Power Plant is our main purpose. The iron phosphate glass (IPG) is a potential candidate as we set about assessing it by means of theoretical and experimental investigation. Based on the results of this study, the IPG showed favorable characteristics as a vitrification medium for the sludge. (author)

  2. Short-cut design of small hydroelectric plants

    Energy Technology Data Exchange (ETDEWEB)

    Voros, N.G.; Kiranoudis, C.T.; Maroulis, Z.B. [National Technical Univ. of Athens, Dept. of Chemical Engineering, Athens (Greece)

    2000-04-01

    The problem of designing small hydroelectric plants has been properly analysed and addressed in terms of maximising the economic benefits of the investment. An appropriate empirical model describing hydroturbine efficiency was developed. An overall plant model was introduced by taking into account their construction characteristics and operational performance. The hydrogeographical characteristics for a wide range of sites have been appropriately analysed and a model that involves significant physical parameters has been developed. The design problem was formulated as a mathematical programming problem, and solved using appropriate programming techniques. The optimisation covered a wide range of site characteristics and three types of commercially available hydroturbines. The methodology introduced an empirical short-cut design equation for the determination of the optimum nominal flowrate of the hydroturbines and the estimation of the expected unit cost of electricity produced, as well as of the potential amount of annually recovered energy. (Author)

  3. Short term hydroelectric power system scheduling with wind turbine generators using the multi-pass iteration particle swarm optimization approach

    International Nuclear Information System (INIS)

    Lee, T.-Y.

    2008-01-01

    This paper uses multi-pass iteration particle swarm optimization (MIPSO) to solve short term hydroelectric generation scheduling of a power system with wind turbine generators. MIPSO is a new algorithm for solving nonlinear optimal scheduling problems. A new index called iteration best (IB) is incorporated into particle swarm optimization (PSO) to improve solution quality. The concept of multi-pass dynamic programming is applied to modify PSO further and improve computation efficiency. The feasible operational regions of the hydro units and pumped storage plants over the whole scheduling time range must be determined before applying MIPSO to the problem. Wind turbine power generation then shaves the power system load curves. Next, MIPSO calculates hydroelectric generation scheduling. It begins with a coarse time stage and searching space and refines the time interval between two time stages and the search spacing pass by pass (iteration). With the cooperation of agents called particles, the near optimal solution of the scheduling problem can be effectively reached. The effects of wind speed uncertainty were also considered in this paper. The feasibility of the new algorithm is demonstrated by a numerical example, and MIPSO solution quality and computation efficiency are compared to those of other algorithms

  4. Hydroelectric power: Energy vector for progress and development; Wasserkraft: Energievektor fuer Fortschritt und Entwicklung

    Energy Technology Data Exchange (ETDEWEB)

    Meclot, B; Dupuy, M; Weis, H; Linari, A; Baril, M; Barlow, M; Cambi, M; Cullen, R; Genier, M; Germeau, J P; Madureira, C; Mellquist, P; Perea, A; Rost, M; Savey, P; Schiller, G; Talhull, A

    1997-11-01

    Hydroelectric power in the UNIPEDE member states has a share of about 18 percent, i.e. slightly less than the world average of 19 percent. Hydroelectric power has good future prospects: It is a renewable energy source and well suited for storage. (orig) [Deutsch] Wasserkraft ist eine Energie, die im Rahmen der von den Mitgliedslaendern der UNIPEDE genutzten Energieerzeugungsarten eine hohe Bedeutung hat. Sie repraesentiert durchschnittlich 18% der erzeugten elektrischen Energie, leicht unterhalb des weltweiten Durchschnitts (19%). Die Merkmale der Wasserkraft verdienen Aufmerksamkeit: Es handelt sich um eine erneuerbare Energie, die in grossen Mengen gespeichert werden kann und in der Energiewirtschaft eine grosse Rolle spielt. (orig.)

  5. Counter rotating type hydroelectric unit suitable for tidal power station

    International Nuclear Information System (INIS)

    Kanemoto, T; Suzuki, T

    2010-01-01

    The counter rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures,was proposed to utilize effectively the tidal power. In the unit, the front and the rear runners counter drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the flow direction at the front runner inlet, because the angular momentum through the rear runner must coincides with that through the front runner. That is, the flow runs in the axial direction at the rear runner outlet while the axial inflow at the front runner inlet. Such operations are suitable for working at the seashore with rising and falling tidal flows, and the unit may be able to take place of the traditional bulb type turbines. The tandem runners were operated at the on-cam conditions, in keeping the induced frequency constant. The output and the hydraulic efficiency are affected by the adjustment of the front and the blade setting angles. The both optimum angles giving the maximum output and/or efficiency were presented at the various discharges/heads. To promote more the tidal power generation by this type unit, the runners were also modified so as to be suitable for both rising and falling flows. The hydraulic performances are acceptable while the output is determined mainly by the trailing edge profiles of the runner blades.

  6. Operating experience from Swedish nuclear power plants 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The total production of electricity from Swedish nuclear power plants was 69.2 TWh during 2001, which is an increase of more than 25% compared to 2000. The hydroelectric power production increased to 78.3 TWh, 22% more than during a normal year, i.e. a year with average rainfall. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 9.6 TWh. The electricity generation totalled 157.6 TWh, the highest annual production to date. The preliminary figures for export were 18.5 TWh and and for import 11.1 TWh. Operational statistics are presented for each Swedish reactor. Two events, given INES level 1 rating, are reported from Barsebaeck 2 and Ringhals 2.

  7. Operating experience from Swedish nuclear power plants 2001

    International Nuclear Information System (INIS)

    2002-01-01

    The total production of electricity from Swedish nuclear power plants was 69.2 TWh during 2001, which is an increase of more than 25% compared to 2000. The hydroelectric power production increased to 78.3 TWh, 22% more than during a normal year, i.e. a year with average rainfall. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 9.6 TWh. The electricity generation totalled 157.6 TWh, the highest annual production to date. The preliminary figures for export were 18.5 TWh and and for import 11.1 TWh. Operational statistics are presented for each Swedish reactor. Two events, given INES level 1 rating, are reported from Barsebaeck 2 and Ringhals 2

  8. CEZ utility's coal-fired power plants: towards a higher environmental friendliness

    International Nuclear Information System (INIS)

    Kindl, V.; Spilkova, T.; Vanousek, I.; Stehlik, J.

    1996-01-01

    Environmental efforts of the major Czech utility, CEZ a.s., are aimed at reducing air pollution arising from electricity and heat generating facilities. There are 3 main kinds of activity in this respect: phasing out of coal fired power plants; technological provisions to reduce emissions of particulate matter, sulfur dioxide, and nitrogen oxides from those coal fired units that are to remain in operation after 1998; and completion of the Temelin nuclear power plant. In 1995, emissions of particulate matter, sulfur dioxide, nitrogen oxides, and carbon monoxide from CEZ's coal fired power plants were 19%, 79%, 59%, and 60%, respectively, with respect to the situation in 1992. The break-down of electricity generation by CEZ facilities (in GWh) was as follows in 1995: hydroelectric power plants 1673, nuclear power plants 12230, coal fired power plants without desulfurization equipment 30181, and coal fired power plants with desulfurization equipment 2277. Provisions implemented to improve the environmental friendliness of the individual CEZ's coal fired power plants are described in detail. (P.A.). 5 tabs., 1 fig

  9. Environmental impact analysis of the hydroelectric power development sheme in the River Grunnaai in Seljord municipality, Telemark

    International Nuclear Information System (INIS)

    Muniz, I.P.; Bendiksen, E.; Erikstad, L.; Reitan, O.

    1997-01-01

    This report discusses the possible environmental consequences of a planned hydroelectric power development of the river Grunnaai, Norway. The consequences are found to be small, provided the proper counter measures are taken. Without counter measures, there may be moderate consequences on fish populations and botanical conditions, directly dependent on the changed water flow. The greatest value of the area concerned lies in its unspoiled wilderness character. There are extensive lists of birds and mammals and plant species registered in the river valley. 51 refs., 7 figs., 4 tabs

  10. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  11. [Limnetic zooplankton run-off a high-head dam and their fate in a river with high current velocity (case of the Krasnoiarsk hydroelectric power station on the Yenisei river].

    Science.gov (United States)

    Dubovskaia, O P; Gladyshev, M I; Makhutova, O N

    2004-01-01

    The vertical distribution of net zooplankton in head-water of Krasnoyarsk hydroelectric power station and its horizontal distribution in the tail-water were studied during two years in winter and summer seasons. In order to distinguish living and dead individuals the special staining was used. It was revealed that on average 77% of living plankton pass through high-head dam with deep water scoop to the tailwater. While passing through dam aggregates some individuals of the reservoir plankton are traumatized and die, that results in some increase of portion of dead individuals in the tail water near dam (from 3 to 6%). Alive zooplankton passed through the dam aggregates is eliminated under the Upper Yenisei highly turbulent conditions. There is approximately 10% of it in 32 km from the dam if compare with biomass in 20-40 m layer of reservoir, the portion of dead increases to 11%. The biomass of zooplankton suspended in the water column of the tail-water sometimes increases (till > 1 g/m3) due to large Copepoda Heteroscope borealis, which inhabits near-bottom and near-shore river zones and can be found in the central part of the river during reproductive period. Limnetic zooplankton from the reservoir cannot be considered as important food for planktivores in the tail-water.

  12. The portfolio theory applied to small hydroelectric power plants; Teoria do portfolio aplicada a pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Bastos, Paulo Roberto Ferreira de Moura

    2002-07-01

    The 'Portfolio Theory' has been largely employed on stock markets, aiming to improve the relation between risk and return. This theory identifies many possible investment combinations once it's associated with the idea that increasing investment diversification can lower risk. The objective is, thus identify the portfolio that offers the most efficient diversification of capital. The reforms on the energy sector in Brazil have made investments on both generation and commercialization of electric energy easier for medium sized investors. There have been economic incentives to the exploration of wind and bio-mass energy, and to the construction of small hydro-electric power plants (in Portuguese, PCH), as well as many legal and regulatory mechanisms pursuing the maintenance of elevate rates of participation of renewable source in the production of electrical energy in Brazil. Between these options, the PCH are a specially good opportunity taking account of its minimum environment impact, low operational costs and total technologic control. The decision concerning investment options has been based on standard economic analysis like 'Net Present Value', 'Payback Time' or 'Cost/Benefit Relations'. Other techniques such as scenario and sensitivity have been incorporated and, more recently, there has been a search for other methods consider the uncertainty of happenings within the horizon of study. This dissertation will analyse six possibilities of PCH with standard techniques. Of them, the four possibilities considered viable will constitute our examples for the application of Portfolio Theory techniques. Once the active portfolio is determined, the best option is identified using the 'mean-variance efficient' developed by Markowitz, concluding that the theory can give better support to the decision-making in future enterprises on the electric sector. After considering the optimal return/risk combinations, there was

  13. The portfolio theory applied to small hydroelectric power plants; Teoria do portfolio aplicada a pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Bastos, Paulo Roberto Ferreira de Moura

    2002-07-01

    The 'Portfolio Theory' has been largely employed on stock markets, aiming to improve the relation between risk and return. This theory identifies many possible investment combinations once it's associated with the idea that increasing investment diversification can lower risk. The objective is, thus identify the portfolio that offers the most efficient diversification of capital. The reforms on the energy sector in Brazil have made investments on both generation and commercialization of electric energy easier for medium sized investors. There have been economic incentives to the exploration of wind and bio-mass energy, and to the construction of small hydro-electric power plants (in Portuguese, PCH), as well as many legal and regulatory mechanisms pursuing the maintenance of elevate rates of participation of renewable source in the production of electrical energy in Brazil. Between these options, the PCH are a specially good opportunity taking account of its minimum environment impact, low operational costs and total technologic control. The decision concerning investment options has been based on standard economic analysis like 'Net Present Value', 'Payback Time' or 'Cost/Benefit Relations'. Other techniques such as scenario and sensitivity have been incorporated and, more recently, there has been a search for other methods consider the uncertainty of happenings within the horizon of study. This dissertation will analyse six possibilities of PCH with standard techniques. Of them, the four possibilities considered viable will constitute our examples for the application of Portfolio Theory techniques. Once the active portfolio is determined, the best option is identified using the 'mean-variance efficient' developed by Markowitz, concluding that the theory can give better support to the decision-making in future enterprises on the electric sector. After considering the optimal return/risk combinations, there was a change on the hierarchy concerning the best options

  14. Model for analysis and definition of the governor constants in hydroelectric power; Modelo para analise e definicao das constantes do regulador em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Jose Geraldo Pena de; Koelle, Edmundo; Luvizotto Junior, Edevar [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Civil. Dept. de Hidraulica e Saneamento

    1997-07-01

    This paper presents a complete mathematical and computer model which allows simulating a generic hydroelectric power plant under steady state and transitory regimes, in the extensive time, and also the analysis of the oscillating flows resulting from excitation sources present in the installation, such as vortices in the suction pipe during partial load operation.

  15. CAS medium-size nuclear plants

    International Nuclear Information System (INIS)

    Vogelweith, L.; Weiss, A.

    1977-01-01

    CEA has developed a range of pressurized water reactors of the type CAS Compact, which are adapted to civil ship propulsion, or to electric power production, combined possibly with heat production, up to outputs equivalent to 125MW(e). Nuclear plants equipped with these reactors are suitable for medium-size electric networks, especially in developing countries, because they are easily adaptable, owing to their flexibility; they can be installed and used in a variety of ways (on land, floating installation, combination of electric power and other production, etc.); they can be used as training reactors by countries wishing to limit their investment plans before undertaking a wider nuclear development. Examples of two possible realizations are presented: as a floating plant, and as a combined electric and desalting plant. (author)

  16. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Science.gov (United States)

    2013-05-16

    ... Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of..., Lakeport Hydroelectric Associates and Lakeport Hydroelectric Corporation (transferors) and Lakeport Hydroelectric One, LLC (transferee) filed an application for the transfer of license for the Lakeport Project...

  17. To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction

    Directory of Open Access Journals (Sweden)

    V. Kh. Nasibov

    2006-01-01

    Full Text Available The paper provides a technique of analytical construction of expendable characteristics and characteristics of a relative gain of water charge at a hydroelectric power station. Planning method and regression analysis have been applied for the construction of these characteristics.

  18. Considering on the use of thermal power plants in Brazil; Discorrendo sobre o uso das termeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Maria Thereza da Silva Lopes; Souza, Marina Correa de [Universidade Federal dos Vales do Jequitinhonha e Mucuri (UFVJM), Diamantina, MG (Brazil). Inst. de Ciencia e Tecnologia

    2015-07-01

    Today, the world depends on an abundant amount of energy. Hence, there is a need in creating new ways of obtaining energy to boost industrial production and thereby increase the wealth of a country. Therefore, industrial growth is strongly linked to way to get clean and cheap energy. In Brazil, preferentially uses the energy from the hydroelectric plants, but these may not always generate the energy required to supply all our needs. So, we can not deny that the thermal power plants have a respectable role in power generation, complementing the energy from the hydroelectric when they go through times of low production, as in periods of drought. (author)

  19. Operating experience from Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The total production of electricity from Swedish nuclear power plants was 70.5 TWh during 1998, which is the second highest yearly production ever. Production losses due to low demand totaled 5.1 TWh combined for all twelve units and production losses due to coastdown operation totaled an additional 0.5 TWh. The reason for this low power demand was a very good supply of water to the hydropower system. Hydroelectric power production was 73.6 TWh, an increase by roughly 5 TWh since 1997. Hence, the hydroelectric power production substantially exceeded the 64 TWh expected during a normal year, i.e. a year with average rainfall. Remaining production sources, mainly fossil fuel electricity production combined with district heating, contributed with 10 TWh. The total electricity production was 154.2 TWh, the highest yearly production ever. The total electricity consumption including transmission losses was 143.5 TWh. This is also the highest consumption ever and an increase by one percent compared to 1997. The preliminary net result of the electric power trade shows a net export by 10.7 TWh. The figures above are calculated from the preliminary production results. A comprehensive report on electric power supply and consumption in Sweden is given in the 1998 Annual Report from the Swedish Power Association. Besides Oskarshamn 1, all plants have periodically been operated in load-following mode, mostly because of the abundant supply of hydropower. The energy availability for the three boiling water reactors at Forsmark averaged 93.3 % and for the three pressure water reactors at Ringhals 91.0 %, both figures are the highest ever noted. In the section `Special Reports` three events of importance to safety that occurred during 1998 are reported. The events were all rated as level 1 according to the International Nuclear Event Scale (INES) Figs, tabs.; Also available in Swedish

  20. Operating experience from Swedish nuclear power plants

    International Nuclear Information System (INIS)

    1999-01-01

    The total production of electricity from Swedish nuclear power plants was 70.5 TWh during 1998, which is the second highest yearly production ever. Production losses due to low demand totaled 5.1 TWh combined for all twelve units and production losses due to coastdown operation totaled an additional 0.5 TWh. The reason for this low power demand was a very good supply of water to the hydropower system. Hydroelectric power production was 73.6 TWh, an increase by roughly 5 TWh since 1997. Hence, the hydroelectric power production substantially exceeded the 64 TWh expected during a normal year, i.e. a year with average rainfall. Remaining production sources, mainly fossil fuel electricity production combined with district heating, contributed with 10 TWh. The total electricity production was 154.2 TWh, the highest yearly production ever. The total electricity consumption including transmission losses was 143.5 TWh. This is also the highest consumption ever and an increase by one percent compared to 1997. The preliminary net result of the electric power trade shows a net export by 10.7 TWh. The figures above are calculated from the preliminary production results. A comprehensive report on electric power supply and consumption in Sweden is given in the 1998 Annual Report from the Swedish Power Association. Besides Oskarshamn 1, all plants have periodically been operated in load-following mode, mostly because of the abundant supply of hydropower. The energy availability for the three boiling water reactors at Forsmark averaged 93.3 % and for the three pressure water reactors at Ringhals 91.0 %, both figures are the highest ever noted. In the section 'Special Reports' three events of importance to safety that occurred during 1998 are reported. The events were all rated as level 1 according to the International Nuclear Event Scale (INES)

  1. Ground failure in direct current systems of the Itaipu Hydroelectric Power Plant, Parana, Brazil. Impact in the operation; Falla a tierra en sistemas de corriente continua en la Central Hidroelectrica Itaipu, PR, Brasil. Impacto en la operacion

    Energy Technology Data Exchange (ETDEWEB)

    Soto Santacruz, Heriberto [Itaipu Binacional, Foz do Iguacu, PR (Brazil)]. E-mail: soto@itaipu.gov.py

    1998-07-01

    The objective of this work is to share with other companies the operation experience obtained by researching the direct current systems ground failure, in the Itaipu Hydroelectric Power Plant. During the research process electrical and/or electronic components can be damaged, and also human failures can occurred during the circuit connection and disconnection manoeuvres, necessary for the identification of the components causing the failures.

  2. Power plant operation and management in a deregulated market

    Energy Technology Data Exchange (ETDEWEB)

    Carraretto, Cristian [Department of Mechanical Engineering, University of Padova, Via Venezia, 1-35131 Padova (Italy)

    2006-05-15

    This paper analyzes the influence of electricity deregulation on the design, operation and management of the power plants owned by strategic and non-strategic producers. After a sensitivity analysis aimed at finding market conditions of profitable operation for thermal and hydroelectric power plants, a Nash-equilibrium market model is used to determine producers' optimum strategies, depending on their relative market power and overall production characteristics. Attention is then focused on the operation of single thermal power plants. Their short-term management plans and consequent effects on emission levels and residual life are described. The available reserve for primary and secondary control deriving from producers' market strategies is discussed. Some design options to improve combined cycles contribution to reserve service are finally described. The paper discusses these problems with a general approach, and uses many cases and examples derived from the current Italian scenario. (author)

  3. Power plant operation and management in a deregulated market

    International Nuclear Information System (INIS)

    Carraretto, Cristian

    2006-01-01

    This paper analyzes the influence of electricity deregulation on the design, operation and management of the power plants owned by strategic and non-strategic producers. After a sensitivity analysis aimed at finding market conditions of profitable operation for thermal and hydroelectric power plants, a Nash-equilibrium market model is used to determine producers' optimum strategies, depending on their relative market power and overall production characteristics. Attention is then focused on the operation of single thermal power plants. Their short-term management plans and consequent effects on emission levels and residual life are described. The available reserve for primary and secondary control deriving from producers' market strategies is discussed. Some design options to improve combined cycles contribution to reserve service are finally described. The paper discusses these problems with a general approach, and uses many cases and examples derived from the current Italian scenario. (author)

  4. Application of fuzzy logic in mapping the environmental impacts of hydroelectric power plants; Aplicacao da logica difusa no mapeamento de impactos ambientais em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Melo, M.N.; Lambert-Torres, G.; Silva, L.E. Borges da [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], Emails: germanoltorres@gmail.com, leborges@unifei.edu.br; Rissino, S.; Silva, M.F. da [Universidade Federal de Rondonia (UFRO), Porto Velho, RO (Brazil)], e-mails: srissino@gmail.com, felipe@unir.br

    2009-07-01

    During the stages prior to installation of a large enterprise, there is an obligation to obtain an environmental license for its effectiveness. However, defining the relevance of an environmental impact generated by changes elapsed in a region, is something subjective, since some variables present qualitative definitions. Aiming to interrelate the variables that influence the environmental impacts in hydroelectric plants, was made the mapping of terms natural resources and degradation of the environment, and its defining variables, based on the theory of fuzzy logic. The construction of fuzzy propositions was based on the manipulation of a rule base, with the 'if' antecedent 'then' consequent structure. It was concluded that the use of fuzzy propositions for the study of environmental impact is an effective method to map the environmental impact caused by construction of a hydroelectric plant, because it defines the degree of influence of impact on the environment.

  5. Study on the technical and economical viability in the using of the spilled turbinable energy from the Itaipu Hydroelectric Power Plant for the ammonia synthesis of the nitrogen fertilizers; Estudo da viabilidade tecnica e economica do aproveitamento da energia vertida turbinavel da usina hidreletrica de Itaipu para sintese de amonia para fertilizantes nitrogenados

    Energy Technology Data Exchange (ETDEWEB)

    Espinola, Michel Osvaldo Galeano [Universidade Nacional de Assuncao (Paraguay). Faculdade de Ciencias Quimicas]. E-mail: michelosvaldo@qui.una.py

    2008-07-01

    In many hydroelectric power plants, when the inflows are greater than the demand for energy, a portion of the water that could be used to generate energy is diverted to the spillway and literally wasted. This energy, designated as 'Spilled Turbinable Energy', could be used advantageously to generate other products or an energy vector that could be stored for later use, since in these occasions the dam is full. The present work studies the feasibility of using the spilled turbinable energy of the Itaipu Hydroelectric Power Plant to produce electrolytic hydrogen that, together with the nitrogen from air, is an important feedstock for the ammonia synthesis, used to produce nitrogen fertilizers. The minimum production cost of electrolytic hydrogen was estimated in US$ 0,246/m3 or US$ 2,750/kg, for a plant with capacity of 55 mil m3/h, which correspond to 247,5 MW of electrical power deriving from 82% of spilled turbinable energy and 18% of guaranteed energy. Next to that hydrogen plant it is possible to install an ammonia plant of approximately 500 t/day, operating 350 days/year, with a production cost of approximately US$ 562,81/t. This capacity is enough to supply 38,5% of the ammonia demand estimated for the region focused in the project, 1.300 t/day. Nowadays, ammonia is commercialized in the Brazilian market by approximately US$ 525,60/t. For that reason, it can be concluded that ammonia production through the association of spilled turbinable and guaranteed energy next to Itaipu Hydroelectric Power Plant is not economically feasible by the moment, mainly due to the high cost of imported electrolysers. Nevertheless, with the installation of an ammonia plant based on water electrolysis next to Itaipu Hydroelectric Power Plant, it could be avoided an annual carbon emission of 234 thousand tons, even considering methane and carbon dioxide emissions of the Itaipu's reservoir. If such project were approved by the Clean Development Mechanism, that

  6. Evaluation of melioration area damage on the river Danube caused by the hydroelectric power plant 'Djerdap 1' backwater.

    Science.gov (United States)

    Pajic, P; Andjelic, L; Urosevic, U; Polomcic, D

    2014-01-01

    Construction of the hydroelectric power plant (HPP) 'Djerdap 1' formed a backwater effect on the Danube and its tributaries, which had an inevitable influence on groundwater level, causing it to rise and thus creating additional threats to all melioration areas on more than 300 km of the Danube riversides, as well as on the riversides of its tributaries: the Sava (100 km) and the Tisa (60 km). In this paper, the HPP 'Djerdap 1' backwater effect on some characteristic melioration areas (34 in all) has been analyzed. In most of these areas intensive agricultural activity has always been present. An assessment of agricultural production damage was carried out by complex hydrodynamic calculations (60 calculation profiles) for different backwater regimes, with the aim to precisely quantify the HPP 'Djerdap 1' backwater effect on groundwater piezometric levels. Combining them with complex agroeconomic analyses, the aim is to quantify agricultural production damage and to consider the perspective of melioration area users. This method, which combines two different, but compatible, aspects of the melioration area threat assessment (hydrodynamic and agroeconomic), may present a quality base for further agricultural production threat assessment on all melioration areas on the Danube riversides, with the final aim to consider the economic effects and the importance of its further protection.

  7. Experience of Minas Gerais Energetic Company (CEMIG) in feasibility studies from hydroelectric power plants: energetic-economic studies; Experiencia da CEMIG em estudos de viabilidade de usinas hidreletricas: estudos energetico-economicos

    Energy Technology Data Exchange (ETDEWEB)

    Ramos, O C; Bras, A J.F.; Batista Neto, R P; Salles Filho, M P [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1990-12-31

    The experience of Minas Gerais Energetic Company (CEMIG) - Brazil, on the use of dimensioning methodology for hydroelectric power plant from the Coordinated Group of Planning System was described, showing the problems with its use and the solutions, mainly the reservoir and the dimension of installed potential. It was concluded that the calculation procedures of the marginal costs for dimensioning, so as to become these costs more representative in future structure of the Brazilian generator park and less dependent to the oscillation due to conjuncture problems, must be re-evaluated. (C.G.C.). 7 refs, 3 figs, 1 tab.

  8. Technical and economic analysis of integrating low-medium temperature solar energy into power plant

    International Nuclear Information System (INIS)

    Wang, Fu; Li, Hailong; Zhao, Jun; Deng, Shuai; Yan, Jinyue

    2016-01-01

    Highlights: • Seven configurations were studied regarding the integration of solar thermal energy. • Economic analysis was conducted on new built plants and retrofitted power plants. • Using solar thermal energy to preheat high pressure feedwater shows the best performance. - Abstract: In order to mitigate CO_2 emission and improve the efficiency of the utilization of solar thermal energy (STE), solar thermal energy is proposed to be integrated into a power plant. In this paper, seven configurations were studied regarding the integration of STE. A 300 MWe subcritical coal-fired plant was selected as the reference, chemical absorption using monoethanolamine solvent was employed for CO_2 ​capture, and parabolic trough collectors and evacuated tube collectors were used for STE collection. Both technical analysis and economic evaluation were conducted. Results show that integrating solar energy with post-combustion CO_2​ capture can effectively increase power generation and reduce the electrical efficiency penalty caused by CO_2 capture. Among the different configurations, Config-2 and Config-6, which use medium temperature STE to replace high pressure feedwater without and with CO_2 capture, show the highest net incremental solar efficiency. When building new plants, integrating solar energy can effectively reduce the levelized cost of electricity (LCOE). The lowest LCOE, 99.28 USD/MWh, results from Config-6, with a parabolic trough collector price of 185 USD/m"2. When retrofitting existing power plants, Config-6 also shows the highest net present value (NPV), while Config-2 has the shortest payback time at a carbon tax of 50 USD/ton CO_2. In addition, both LCOE and NPV/payback time are clearly affected by the relative solar load fraction, the price of solar thermal collectors and the carbon tax. Comparatively, the carbon tax can affect the configurations with CO_2 capture more clearly than those without CO_2 capture.

  9. Power converters for medium voltage networks

    CERN Document Server

    Islam, Md Rabiul; Zhu, Jianguo

    2014-01-01

    This book examines a number of topics, mainly in connection with advances in semiconductor devices and magnetic materials and developments in medium and large-scale renewable power plant technologies, grid integration techniques and new converter topologies, including advanced digital control systems for medium-voltage networks. The book's individual chapters provide an extensive compilation of fundamental theories and in-depth information on current research and development trends, while also exploring new approaches to overcoming some critical limitations of conventional grid integration te

  10. Active tectonics and Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (NW Himalaya, India)

    Science.gov (United States)

    Draganits, Erich; Grasemann, Bernhard; Gier, Susanne; Hofmann, Christa-Charlotte; Janda, Christoph; Bookhagen, Bodo; Preh, Alexander

    2015-04-01

    The Baspa River is one of the most important tributaries to the Sutlej River in the NW Himalaya (India). Its catchment is 1116 km2 in size, ranges from c. 6400 m asl to 1770 m asl and contains India's largest private hydroelectric facility, the 300 MW Baspa II. Geologically, the hydroelectric installation is located in the Higher Himalayan Crystalline, just above the active Karcham Normal Fault, which is reactivating the Early Miocene Main Central Thrust, one of the principal Himalayan faults. The area is seismically active and mass-movements are common. Around 8200 yrs BP the Baspa was dammed by a rock-avalanche dam, leading to the formation of the originally c. 260 m deep palaeo-lake Sangla palaeo-lake. Detailed sedimentological investigations and radiocarbon dating indicate that the palaeo-lake was completely filled with sediments until c. 5100 yrs BP. This makes the Sangla palaeo-lake to a very rare example of a mass-movement dam with very long duration and its lacustrine sediments represent a valuable archive for geological processes and environmental proxies within the Baspa catchment during the c. 3100 years of its existence - which are the aim of our study. At least 5 levels of soft-sediment deformation have been recorded in the exposed part of the lacustrine sediments of Sangla palaeo-lake, including brecciated laminae, overturned laminae, folds, faults and deformation bands, separated by undeformed deposits. They are interpreted as seismites, indicating at least 5 earthquakes within 2500 years strong enough to cause liquefaction. The 300 MW Baspa II hydro-electric power plant has been built exactly on top of this palaeo-lake. This special location represents a very rare possibility to evaluate the short-term, river load and hydrological parameters measured during the planning and operational stages of Baspa II with the long-term parameters gained from the palaeo-lake sediments from the catchment. This data show that the Mid-Holocene erosion rates of the

  11. Problems of small hydroelectric power plants - SHP: the example of Sao Paulo State, Brazil; Problematica de desenvolvimento das pequenas centrais hidreletricas-PCH: o exemplo do Estado de Sao Paulo

    Energy Technology Data Exchange (ETDEWEB)

    Matajs, R.R. [Sao Paulo Univ., SP (Brazil). Programa Interunidades de Pos-Graduacao em Energia; Fabrizy, M.P. [Sao Paulo Univ., SP (Brazil). Inst. de Eletrotecnica e Energia

    1994-07-01

    This paper presents a survey of the small hydroelectric potential in the State of Sao Paulo - Brazil. Three projections will be presented as as attempt to show the possible participation of the SHP in a sort, medium and long term, in the State of Sao Paulo energetic matrix.

  12. Operating experience from Swedish nuclear power plants 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The total production of electricity from Swedish nuclear power plants was 65.6 TWh during 2002, which is a decrease compared to 2001. The energy capability factor for the 11 Swedish reactors averaged 80.8%. The PWRs at Ringhals averaged 87.6%, while the BWRs, not counting Oskarshamn 1, reached 89.2%. No events, which in accordance to conventions should be reported to IAEA, have occurred during 2002. Operational statistics are presented for each Swedish reactor. The hydroelectric power was 66 TWh, 16% lower than 2000. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 10.9 TWh. The electricity generation totalled 143 TWh, considerably less than the record high 2001 figure of 158.7 TWh. The preliminary figures for export were 14.8 TWh and and for import 20.1 TWh.

  13. Evaluation of our hydroelectric resources

    International Nuclear Information System (INIS)

    Unsal, Istemi; Onoz, Bihrat

    2006-01-01

    Because of the geo energetic position of our country, its geo strategic importance becomes even greater due to the fact that one of the basic problems of our century is to meet the energy demand. In this study one of the most significant energy resources of our country, hydroelectric energy production resource has been made of subject and a general evaluation has been performed considering our country's conditions. In meeting countries general energy demands diversity of production sources and resources where they are supplied from shows great importance. Our country is quite rich from the aspect of hydroelectric potential which is the most significant among the renewable energy resources. That is why our hydroelectric potential (HEP) has been investigated by considering Feasibility, Operation Specifications, Economy, External Dependence issues in electrical energy planning.. In our country, it is frequently being emphasized that 35% of our HEP has been evaluated though which HEP is of subject, is not explained. While HEP is defined at 4 levels namely as Gross (GHEP), Technical (THEP), Economic (EHEP) and Evaluated HEPs. Our country is placed in 2nd place in Europe from the aspect of GHEP whereas it is placed as one of the last from the aspect of evaluated HEP. Capacity usage for hydroelectric plants has been foreseen as 40.5% (3548 hours/year) by the 2005-2020 planning prepared by ETKB (Ministry of Energy and Natural Resources). On the other hand, capacity usage has been found as 40.3% for the analysis for realized cases using DSI (State Water Works) 2006 data, which is only 0.5% below the foreseen value.What mainly lowers the realized average is the hard pressure applied to hydraulic plants during the period 1995-1999. The situation which arises as a result of this operation policy is wrongly interpreted by DPT (State Planning Organization) and consequently hydroelectric plants are defined as unreliable. However, since sufficient storage plants which will

  14. Mixed-integer nonlinear approach for the optimal scheduling of a head-dependent hydro chain

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-08-15

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We propose a novel mixed-integer nonlinear programming (MINLP) approach, considering hydroelectric power generation as a nonlinear function of water discharge and of the head. As a new contribution to earlier studies, we model the on-off behavior of the hydro plants using integer variables, in order to avoid water discharges at forbidden areas. Thus, an enhanced STHS is provided due to the more realistic modeling presented in this paper. Our approach has been applied successfully to solve a test case based on one of the Portuguese cascaded hydro systems with a negligible computational time requirement. (author)

  15. Report of the joint review panel : Glacier Power Ltd Dunvegan Hydroelectric Project, Fairview, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-19

    This paper presented the results of a review of the Dunvegan hydroelectric project proposed for development on Alberta's Peace River. In addition to stating the project's purpose, viability, and benefits, the review examined the potential environmental and socio-economic impacts of the hydroelectric project and outlined conclusions developed through consultation with participants of public hearings. The review included a study of transmission lines needed for the project, and the likely impact of the hydroelectric plant on the Peace River fishery and ice regimes. Geotechnical issues related to slope stability, sedimentation and channel morphology, seismicity, and sedimentation in the region were analyzed. The impact of the project on wildlife, vegetation and forest resources was also examined. The study also examined impacts related to health and safety. Potential cumulative effects were reviewed, and First Nations and Metis concerns were outlined. It was concluded that impacts related to the construction, operation, and decommissioning of the project are not likely to be significant. tabs., figs.

  16. Energy reserves and power plants in the USSR

    Energy Technology Data Exchange (ETDEWEB)

    Madaus, C

    1971-12-01

    Solid fuels are still of primary importance in the USSR. Coal reserves and production rates are outlined. Natural gas reserves are estimated to be about 70 x 10/sup 18/m/sup 3/, with operational fields having a capacity of about 12.1 x 10/sup 18/m/sup 3/. Detailed data concerning gas and hydrodynamic reserves, energy production statistics, and high-capacity condensation-turbines are tabulated. Extensive technical data is also provided concerning installed nuclear, thermal, and hydroelectric power plants. Solar energy remains in very early stages of development. In some areas, particularly the foothills of the Caucasus, Kirim, and Kamchatka, conditions are highly favorable for the development of geothermal power plants. A geothermal installation is planned for Kamchatka. It will have a capacity of 700-850 MW, and will be driven by thermal waters arising from the Awatschinskaja Sopka volcano. Four tidal power-plants were planned for construction by 1976. The first was completed in 1968, at the Barent Sea. One of these plants will have a capacity of 30-35 TWh/annum.

  17. Combined effect of upstream surge chamber and sloping ceiling tailrace tunnel on dynamic performance of turbine regulating system of hydroelectric power plant

    International Nuclear Information System (INIS)

    Guo, Wencheng; Yang, Jiandong

    2017-01-01

    Highlights: • Nonlinear mathematical model and Hopf bifurcation analysis of turbine regulating system are presented. • Dynamic performance of turbine regulating system under 0.5 times Thoma sectional area is analyzed and a novel dynamic performance is revealed. • Relationship between two bifurcation lines and wave superposition is studied. • Combined effect mechanisms of upstream surge chamber and sloping ceiling tailrace tunnel on stability are revealed and optimization methods are proposed. - Abstract: Based on the nonlinear mathematical model of the turbine regulating system of hydroelectric power plant with upstream surge chamber and sloping ceiling tailrace tunnel and the Hopf bifurcation theory, this paper firstly studies the dynamic performance of the turbine regulating system under 0.5 times Thoma sectional area of surge chamber, and reveals a novel dynamic performance. Then, the relationship between the two bifurcation lines and the wave superposition of upstream surge chamber and sloping ceiling tailrace tunnel is analyzed. Finally, the effect mechanisms of the wave superposition on the system stability are investigated, and the methods to improve the system stability are proposed. The results indicate that: Under the combined effect of upstream surge chamber and sloping ceiling tailrace tunnel, the dynamic performance of the turbine regulating system of hydroelectric power plant shows an obvious difference on the two sides of the critical sectional area of surge chamber. There are two bifurcation lines for the condition of 0.5 times Thoma sectional area, i.e. Bifurcation line 1 and Bifurcation line 2, which represent the stability characteristics of the flow oscillation of “penstock-sloping ceiling tailrace tunnel” and the water-level fluctuation in upstream surge chamber, respectively. The stable domain of the system is determined by Bifurcation line 2. The effect of upstream surge chamber mainly depends on its sectional area, while the

  18. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  19. Analysis of technologies and economics for geothermal energy utilization of electric power plant

    International Nuclear Information System (INIS)

    Haijie, C.

    1993-01-01

    Geothermal energy -- it is a kind of heat energy which pertains to the internal heat of the earth. It carries the heat of the earth outward by the underground water of the rock section of the earth. Normally, the temperature of the thermal water is 50 degrees-140 degrees. During the 20th century, the rapid development of industry and agriculture quickly increased the need for large amounts of electric power. Now, although there are coal power plants, oil and nature gas power plants, hydroelectric power and nuclear power plants, all countries of the world attach importance to the prospect of geothermal power plants. It is the most economic (no consumption fuel) and safe (no pollution) power plant. (Present author considered that the chlorofluorocarbon refrigerants such as RII, R12, and etc. are not used). In 1904, Italy established the first geothermal power plant in the world. Soon afterwards, the U.S.A., Iceland, Japan, Russia, and New Zealand also established geothermal power plants. In 1970, China, North China, Jiang province and Guangdong province also established geothermal power plants. In 1975, the U.S.A. geothermal power plant capacity of 522mw was the first in the world

  20. An innovative ORC power plant layout for heat and power generation from medium- to low-temperature geothermal resources

    International Nuclear Information System (INIS)

    Fiaschi, Daniele; Lifshitz, Adi; Manfrida, Giampaolo; Tempesti, Duccio

    2014-01-01

    Highlights: • Explotation of medium temperature geothermal resource with ORC–CHP is investigated. • A new CHP configuration to provide higher temperature to thermal user is proposed. • Several organic fluids and wide range of heat demand are studied. • The system produces higher power (almost 55%) in comparison to typical layouts. • Optimal working fluids vary with the characteristics of the heat demand. - Abstract: Medium temperature (up to 170 °C), water dominated geothermal resources are the most widespread in the world. The binary geothermal-ORC power plants are the most suitable energy conversion systems for this kind of resource. Specifically, combined heat and power (CHP) systems have the potential to improve the efficiency in exploiting the geothermal resources by cascading the geothermal fluid heat carrier to successively lower temperature users, thus increasing first and second law efficiency of the entire power plant. However, geothermal CHPs usually extract heat from the geofluid either in parallel or in series to the ORC, and usually provide only low temperature heat, which is seldom suitable for industrial use. In this paper, a new CHP configuration, called Cross Parallel CHP, has been proposed and analyzed. It aims to provide higher temperature heat suitable for industrial use, allowing the exploitation of geothermal resources even in areas where district heating is not needed. The proposed CHP allows the reduction of the irreversibilities in the heat exchangers and the loss to the environment related to the re-injection of geofluid, thus producing higher electric power output while satisfying, at the same time, the heat demand of the thermal utility for a wide range of temperatures and mass flow rates (80–140 °C; 3–13 kg/s). Several organic fluids are investigated and the related optimizing working conditions are found by a built in procedure making use of genetic algorithms. The results show that the optimal working fluids and

  1. Slovak Electric, plc, Bohunice Nuclear Power Plant

    International Nuclear Information System (INIS)

    1999-01-01

    A brief account of activities carried out by the Bohunice Nuclear Power Plant in 1998 is presented. These activities are reported under the headings: (1) Operation and electric power generation; (2) Nuclear and radiation safety; (3) Maintenance and scheduled refuelling out-gages; (4) Investment and WWER units upgrading; (5) Power Plants Personnel; (6) Public relations

  2. Methodology to identify the location of shoals of fish downstream from hydroelectric power plant; Metodologia para identificar a locacao de cardumes de peixes a jusante de UHE

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, C.B.; Viana, E.M.F.; Faria, M.T.C. de [Universidade Federal de Minas Gerais, Belo Horizonte, MG (Brazil). Centro de Pesquisas Hidraulicas e Recursos Hidricos], Emails: martinez@cce.ufmg.br, ednamariafaria@ufmg.br, mtcdf@uol.com.br

    2009-07-01

    The location identification of fish shoals at the downstream of an hydroelectric power plants is a task of importance especially when one takes into account the need to identify possible locations for the deployment of fish transportation mechanism. This paper presents a methodology based on the use of reduced models, which will be operated during the biological testing, under flow and conditions similar to the field where will be included shoals of fish. These groups will be observed during a period of time under varying conditions of discharge of hydraulic turbines. At the end of this observation it can be identified preferential location areas of fish shoals that will be evaluated later in order to install transposition systems in the place.

  3. Productivity and efficiency analysis of privatized hydroelectric generation with a sometimes free input

    Science.gov (United States)

    Halabi, Claudia Elizabeth

    2000-10-01

    In this paper I use a stochastic distance frontier approach to assess the performance of Chile's hydroelectric industry, which operates within a regulatory framework designed to achieve a competitive outcome. An occasionally free input, water, is the sole energy input. The econometric analysis indicates substantial technical and allocative inefficiencies as well as volatile productivity scores, due presumably to the volatility of the energy input. Some allocative inefficiencies have diminished dramatically as the time under deregulation has grown. The Lerner index suggests that firms in the industry enjoy some degree of market power, reflected by prices that exceed marginal costs. This market power is consistent with operation within a centralized dispatch center, as predicted by a strategic bidding model. I also find that run-of-river plants exhibit increasing returns to scale, while plants relying on dams show slightly diminishing returns. The shadow marginal cost for run-of-river plants is found to be close to zero. Substantial cost savings could be realized if firms in Chile's hydro-electric generation industry were to operate efficiently.

  4. Hydroelectricity at the crossroad: let us give a new momentum to the first renewable energy. White paper on hydroelectricity

    International Nuclear Information System (INIS)

    2017-01-01

    This publication first indicates some data which illustrate the role, importance and development perspectives of hydroelectricity in terms of energy production and in terms of jobs. It outlines that, due to its high adaptation capacity and flexibility, hydroelectricity is an important factor for territory development, that it has a major role in energy supply safety, in the energy mix, and in decentralised energy production. It proposes an overview of the different types of hydroelectric installations: reservoirs for a flexible production and supply safety, run of river hydro systems for a continuous and renewable energy production, pumped storage power stations for mass storage of electric energy. It proposes an overview of assets of hydroelectric energy: implementation of energy transition on the long term, development of an industrial sector of excellence, a responsible and supportive energy, compatibility between hydroelectricity, biodiversity and water usages. Proposals are then formulated to give electricity a new momentum: a new orientation of national and European policies for a better global consistency, a new orientation of economic choices and tax policy as incentives to maintenance and development of the hydroelectric sector, and a fair compensation of services provided to the electric power system

  5. Hydroacoustic modelling and numerical simulation of unsteady operation of hydroelectric systems[Dissertation 3713

    Energy Technology Data Exchange (ETDEWEB)

    Nicolet, Ch.

    2007-03-15

    Hydropower represented in 1999 19% of the world electricity production and the absolute production is expected to grow considerably during the next 30 years. Francis turbines play a major role in the hydroelectric production due to their extended range of application. Due to the deregulated energy market, hydroelectric power plants are increasingly subjecting to off design operation, start-up and shutdown and new control strategies. Consequently, the operation of Francis turbine power plants leads to transients phenomena, risk of resonance or instabilities. The understanding of these propagation phenomena is therefore paramount. This work is a contribution to the hydroacoustic modelling of Francis turbine power plants for the investigation of the aforementioned problematic. The first part of the document presents the modelling of the dynamic behavior and the transient analysis of hydroelectric power plants. Therefore, the one-dimensional model of an elementary pipe is derived from the governing equations, i.e. momentum and continuity equations. The use of appropriate numerical schemes leads to a discrete model of the pipe consisting of a T-shaped equivalent electrical circuit. The accuracy in the frequency domain of the discrete model of the pipe is determined by comparison with the analytical solution of the governing equations. The modelling approach is extended to hydraulic components such as valve, surge tanks, surge shaft, air vessels, cavitation development, etc. Then, the modelling of the Francis, Pelton and Kaplan turbines for transient analysis purposes is presented. This modelling is based on the use of the static characteristic of the turbines. The hydraulic components models are implemented in the EPFL software SIMSEN developed for the simulation of electrical installations. After validation of the hydraulic models, transient phenomena in hydroelectric power plants are investigated. It appears that standard separate studies of either the hydraulic or of

  6. Financial risk in the small scale hydroelectric power plant in the PROINFA; Riscos financeiros em uma PCH no PROINFA

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Jailson Jose Medeiros; Estima, Luiz Claudio Pires; Martins, Marcelo Jaques [Centrais Eletricas Brasileiras S.A. (ELETROBRAS), Rio de Janeiro, RJ (Brazil). Dept. de Engenharia de Geracao. Div. de Acompanhamentos de Empreendimentos de Geracao

    2006-10-15

    The current work presents the study of the involved financial risks in an enterprise of a small hydroelectric plant in the incentive program of the alternative sources of electric energy (PROINFA), The financial conditions elaborated by the government through its bilateral contracts are analyzed with the objective to stimulate the private capital to participate of the program and thus to the diversification of our energy matrix in the next years. The research has as objective to identify and to consider the financial risks where a plant incurs when participating of a program as this. For risk analysis the simulation method of Monte-Carlo was used, that is an efficient methodology for calculation of financial risks in this type's enterprises. It is shown that these contracts are very useful tools to the businesses of this sector, adding economic-financial benefits to the Brazilian energy market. (author)

  7. Conference SFEN about small and medium power reactors

    International Nuclear Information System (INIS)

    Giger, F.

    2001-01-01

    The main assets of low and medium power reactors (RPMP) are: a better implement in the existing power production network, less impact to the environment, a better profitability of the capital invested because of a shorter building time and a financing easier to find because less investment is required. Shorter building time and a lower power increment than that of a classical nuclear power plant reduce the risk of anticipation and the duration of possible over-equipment. (A.C.)

  8. Operating experience from Swedish nuclear power plants, 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    The total generation of electricity from Swedish nuclear power plants was 70.1 TWh during 1999, which is slightly more than the mean value for the last five years. The total electricity consumption decreased by one percent, compared with 1998, to a total of 142.3 TWh, due to an unusually warm summer and autumn. The abundant supply of hydroelectric power resulted in comparatively extensive load-following operation by the nuclear plants during the year. Production losses due to low demand totalled 3.0 TWh. The closure of Barsebaeck 1 will result in a capacity reduction exceeding 4 TWh per year. The hydroelectric power production was 70 TWh, which was 6 TWh more than during a normal year, i.e. a year with average rainfall. The remaining production sources, mainly from solid fuel plants combined with district heating contributed 9 TWh. Electricity generation by means of wind power is still increasing. There are now about 470 wind power stations, which produced 0.3 TWh during the year. The total electricity generation totalled 149.8 TWh, a three percent decrease compared with 1998. The preliminary figures for export were 15.9 TWh and for import 8.4 TWh. The figures above are calculated from the preliminary production result. A comprehensive report on electric power supply and consumption in Sweden is provided in the 1999 Annual Report from the Swedish Power Association. The unit capability factor for the PWRs at Ringhals averaged 91%, while the BWRs averaged 82% mainly due to the extended outages. The BWR reactors at Forsmark averaged as much as 93%. Forsmark 1 experienced the shortest refuelling outage ever in Sweden, only 9 days and 20 hours. In May, Oskarshamn 2 passed a historical milestone - the unit produced 100 TWh since connection to the grid in 1974. The final production day for Barsebaeck 1, which had been in commercial operation since 1975, was on November 30 when a decision by the Swedish Government revoked the operating licence. Three safety-related events

  9. Development of a method to assess regional effects of developing small hydroelectric power plants in the county of Nordland; Utvikling av metodikk for analyse av sumvirkninger for utbygging av smaa kraftverk i Nordland. Forprosjekt naturmiljoe

    Energy Technology Data Exchange (ETDEWEB)

    Erikstad, L.; Hagen, D.; Evju, M.; Bakkestuen, V.

    2009-09-15

    Small hydroelectric power plants are defined as power plants with maximum effect of 10MV, normally without the need for water reservoirs. It is an increasing interest in developing small power plants. The development is regarded as environmental friendly mainly because it is renewable and non-polluting. Building of power plants do, however, impact nature through technical encroachment. In some areas there is a high density of suggested projects. This raises the need to assess effects on a larger scale than one and each project alone. The report contains an analysis of how series of projects can affect the natural environment. It is based on a defined resource specification on 1432 objects in the county of Nordland. These are compared with the modeled distribution on selected and relevant nature types where steep river beds, gorges and northerly wooded hill slopes are the most important. The analysis focuses on the sum of effects on local natural values. Values of regional and national importance are dealt with according to national procedures and is not the issue of this report. The developed method has five stages: Scoping; Analysis of natural values and vulnerability; Local and regional effects of small power plants; Assessment of mitigation possibilities; How the result can improve the planning procedure for small power plants. Development of small power plants in Nordland affects nature types that are important to the natural character of Nordland. The largest potential for negative effects is linked to additional technical encroachments (roads etc.) in untouched valley- and fjord landscapes. A greater focus on mitigation and alternative technical solutions are important to avoid these problems. (Author)

  10. Three run-of-river power plants

    International Nuclear Information System (INIS)

    1992-01-01

    Three 'run-of-river' hydroelectric power plants in the Montreal area in the province of Quebec were described visually and in sound. A run-of-river generating station is one that has no reservoir behind the generating facilities. Instead of a reservoir, the generating station draws its power from the strong flow of the whole river as it passes through the turbines. The first generating station described was the Beauharnois power plant completed in 1963 which became the most powerful generating station in Canada at that time. Today, it ranks fourth after the La Grande complex. In winter, it supplies electricity primarily to the Quebec power system, but between April and November, 90 per cent of its power is destined for export. The Carillon power station on the Ottawa River, the second to be discussed in this videotape presentation, was completed in 1964 with a total generating capacity of 654 MW. Today, it is the tenth largest of its kind in Quebec. The Rivieres des Prairies generating station, the third and last one described was completed in 1930; today it has a generating capacity of 45 MW. Some of the efforts made by Hydro-Quebec to protect and enhance the natural environment were shown in action, including regular removal and recycling of debris at the gateways to the generating stations, construction of fish spawning ladders, and the control of zebra mussels

  11. The Amazon Hydroelectric Dams, an Internal Geopolitical Issue in Brazil

    International Nuclear Information System (INIS)

    Broggio, Celine; Droulers, Martine; Pallamar, Juan-Pablo

    2017-01-01

    This paper develops a geopolitical analysis of dams and hydroelectric plants in the Brazilian Amazon since the mid-2000's. The implementation of these projects has provoked tensions within the federal government under the presidency of the Workers' Party and accelerated the erosion of the ideological and political platform called 'socio-environmentalism', a situation that has led to the break-up of the coalition leading to the political crisis of 2016 and the impeachment of President Dilma Rousseff. From a regional point of view, the dispute occurred in very different terms in the case of the Madeira hydroelectric power stations (Santo Antonio and Jirau in Rondonia) and in the case of the Xingu dam (Belo Monte in Para), worldwide covered by the media

  12. Fiscal 1980 Sunshine Project research report. Development of hydrothermal power plant. Development of binary cycle power plant (Research on heat cycle, heat medium, material and heat medium turbine); 1980 nendo nessui riyo hatsuden plant no kaihatsu seika hokokusho. Binary cycle hatsuden plant no kaihatsu (netsu cycle oyobi netsubaitai no kenkyu, zairyo no kenkyu narabini netsubaitai turbine no kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This report summarizes the fiscal 1980 research result on each element of the next 10MW class geothermal binary cycle power plant, following last year. In the research on heat cycle and heat medium, measurement was made on the liquid density, vapor density, liquid specific heat, vapor specific heat and thermal conductivity of 8 heat media to prepare the precise pressure enthalpy chart. The thermal stability of each medium was also measured under a flow condition. The heat cycle of each medium was calculated in a hydrothermal temperature range of 120-160 degrees C for evaluation of its output. In the research on material, field corrosion test and laboratory simulation were made on 3 kinds of heat exchanger martials for acidic hot water to study the corrosion behavior of welding members. In the research on heat medium turbine, study was made on sealing characteristics such as differential pressure, flow rate and friction of sealing oil for oil film seal and mechanical seal as shaft seal devices of heat medium turbines for the 10MW class geothermal plant. (NEDO)

  13. 27 CFR 19.914 - Medium plants.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Medium plants. 19.914... OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Distilled Spirits For Fuel Use Permits § 19.914 Medium plants. Any person wishing to establish a medium plant shall make application for and obtain in...

  14. The impact of climate change on hydro-electricity generation

    Energy Technology Data Exchange (ETDEWEB)

    Musy, A.; Music, B.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2008-07-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs.

  15. The impact of climate change on hydro-electricity generation

    International Nuclear Information System (INIS)

    Musy, A.; Music, B.; Roy, R.

    2008-01-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs

  16. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested parties to attend a teleconference from...

  17. Start. Slovak power stations, Nuclear Power Plants Mochovce (Annual report 1998)

    International Nuclear Information System (INIS)

    1999-01-01

    A brief account of activities carried out by the Nuclear power plants Mochovce in 1998 is presented. These activities are reported under the headings: (1) Director's foreword; (2) Power plant management; (3) Highlights of 1998; (4) Quality system; (5) Electricity and heat generation; Maintenance; Capital construction; (6) Radiation safety; Environmental impacts of operations; (7) List of balances; Human resources; (8) International co-operation; Public relations

  18. An estimation of the capacity to produce hydrogen by wasted hydroelectric energy for the three largest Brazilian hydroelectric

    Energy Technology Data Exchange (ETDEWEB)

    Padilha, Janine C.; Trindade, Leticia G. da; Souza, Roberto F. de [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. of Chemistry], Email: janine@iq.ufrgs.br; Miguel, Marcelo [Itaipu Binacional, Foz do Iguacu, PR (Brazil)

    2010-07-01

    The use of water wasted in hydroelectric plants as normalization dam excess, which constitute a hydrodynamic potential useful to generate electric energy which can be subsequently used to produce hydrogen and its subsequent consumption in fuel cells has been considered as an alternative for hydraulic energy-rich countries like Brazil. The case is examined in which all the water wasted in the hydroelectric plants, spilled by dam gates to maintain acceptable water levels, from the 3 largest Brazilian hydroelectric plants was used to produce hydrogen. During the year of 2008, the electric energy produced from this utilization would have been equivalent to 52.8 TWh, an amount that corresponds to an increase of ca. 15% of the total electric energy produced in the country. Furthermore, if this amount of hydrogen was used in the replacement of internal combustion vehicles by fuel cells, this would have prevented the production of 2.26 x 10{sup 7} ton of Co{sub 2} per year. This plan would also significantly decrease production and release of greenhouse gases. (author)

  19. EDM - A model for optimising the short-term power operation of a complex hydroelectric network

    International Nuclear Information System (INIS)

    Tremblay, M.; Guillaud, C.

    1996-01-01

    In order to optimize the short-term power operation of a complex hydroelectric network, a new model called EDM was added to PROSPER, a water management analysis system developed by SNC-Lavalin. PROSPER is now divided into three parts: an optimization model (DDDP), a simulation model (ESOLIN), and an economic dispatch model (EDM) for the short-term operation. The operation of the KSEB hydroelectric system (located in southern India) with PROSPER was described. The long-term analysis with monthly time steps is assisted by the DDDP, and the daily analysis with hourly or half-hourly time steps is performed with the EDM model. 3 figs

  20. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    Science.gov (United States)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  1. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  2. Modelling and controlling hydropower plants

    CERN Document Server

    Munoz-Hernandez, German Ardul; Jones, Dewi Ieuan

    2013-01-01

    Hydroelectric power stations are a major source of electricity around the world; understanding their dynamics is crucial to achieving good performance.  Modelling and Controlling Hydropower Plants discusses practical and well-documented cases of modelling and controlling hydropower station modelling and control, focussing on a pumped storage scheme based in Dinorwig, North Wales.  Single-input-single-output and multiple-input-multiple-output models, which cover the linear and nonlinear characteristics of pump-storage hydroelectric power stations, are reviewed. The most important dynamic features are discussed, and the verification of these models by hardware in the loop simulation is described. To show how the performance of a pump-storage hydroelectric power station can be improved, classical and modern controllers are applied to simulated models of the Dinorwig power plant. These include PID, fuzzy approximation, feed-forward and model-based predictive control with linear and hybrid prediction models. Mod...

  3. Erosion Control and Recultivation Measures at a Headrace Channel of a Hydroelectric Power Plant using Different Combined Soil Bioengineering Techniques

    Science.gov (United States)

    Obriejetan, M.; Florineth, F.; Rauch, H. P.

    2012-04-01

    vegetation properties are studied by setting up comparative test plots at a field study site located at a headrace channel of a hydroelectric power plant. Different vegetational parameters such as basal coverage, species richness, species composition, abundance/dominance values by using a refined Braun-Blanquet cover estimation scale were collected as well as local environmental properties. Results during the first vegetation period show distinct effects of geotextiles especially on overall vegetation coverage and grasses-herbs-ratio. Geotextile supported plots show 20% higher overall coverage but lower amount of herbs after three months of vegetation growth compared to control plots without installation of auxiliary materials. Furthermore coir blankets reveal higher penetration resistance for seed leaves of herbal plants compared to coir nettings. Hence technical erosion protection products, biological components and it's combination have to be closely coordinated in order to achieve specified revegetation objectives and meet long-term functionality.

  4. Solar thermal power plants

    International Nuclear Information System (INIS)

    Schnatbaum, L.

    2009-01-01

    The solar thermal power plant technology, the opportunities it presents and the developments in the market are outlined. The focus is on the technology of parabolic trough power plants, a proven technology for solar power generation on a large scale. In a parabolic trough power plant, trough-shaped mirrors concentrate the solar irradiation onto a pipe in the focal line of the collector. The thermal energy thus generated is used for electricity generation in a steam turbine. Parabolic trough plants can be combined with thermal storage and fossil or biomass fired heat exchangers to generate electricity even when the sun is not shining. Solar Millennium AG in Erlangen has developed the first power plant of this kind in Europe. After two years of construction the plant started operation in Southern Spain in 2008. This one and its sister projects are important steps leading the way for the whole market. The paper also covers the technological challenges, the key components used and the research and development activities concerning this technology. Solar thermal power plants are ideal for covering peak and medium loads in power grids. In hybrid operation they can also cover base-load. The Solar Chimney power plant, another striking technology for the conversion of solar into electric energy, is described briefly. The paper concludes with a look at the future - the import of solar energy from the deserts of North Africa to central Europe. (author)

  5. Downstream environmental impacts of dams: case study Tucurui Hydroelectric Plant, PA; Impactos ambientais a jusante de hidreletricas: o caso da usina de Tucurui, PA

    Energy Technology Data Exchange (ETDEWEB)

    Manyari, Waleska Valenca

    2007-12-15

    The hydroelectric resources of the Amazon region are considered a competitive alternative despite the structural problems they entail. Concerning the latter, plans to build large-scale dams in the region have drawn criticism mainly on account of the loss of forest cover in areas flooded by dam reservoirs and the conflicts concerning the relocation of indigenous and riverside communities in the region. This study seeks to contribute to better understanding of the environmental issue in the Amazon by focusing attention on the downstream effects of dams, which have large-scale, hitherto neglected ecological repercussions. The impact of dams extends well beyond the area surrounding the artificial lakes they create, harming rich Amazon wetland ecosystems. The morphology of dammed rivers changes in response to new inputs of energy and matter, which may in turn destroy certain biotypes. This is a remote-sensing-based case study of the Tucurui hydroelectric scheme in the Amazon state of Para. Attention is drawn to the need to take into account effects on alluvial rivers downstream from hydroelectric power plants when it comes to making planning decisions, as part of a sustainable energy policy. (author)

  6. Have Norwegian producers of hydroelectric power wasted the water?

    International Nuclear Information System (INIS)

    2003-01-01

    Norwegian producers of hydroelectric power have been criticized for having exported power to Sweden during the autumn and winter 2003/2004. As this analysis shows, although the reservoir level in Norway was below normal in October already, the negative deviation from the normal reservoir level was even greater in Sweden till the end of the year. Also when the magnitude of the reserve is measured relative to the number of weeks with normal winter production for which it lasts, the situation was worse in Sweden than in Norway. After New Year the deviation from the normal reservoir level has been much the same in the two countries and has changed in parallel. During this period the exchange between the two countries has approximately balanced and the power flow from Sweden to Norway has grown gradually. With this as a background, there is no basis for asserting that the Norwegian producers have managed the water resources in an irresponsible way. In general, the power flow and the water resource management in the two countries appear reasonable considering the water influx and the prices. Different market imperfections may nevertheless have rendered the water resource management socially less then optimal.

  7. Multidisciplinary studies on hydric, energetic and environmental resources, evaluating the hydroelectric plants energy surplus as alternative for hydrogen production; Estudos multidisciplinares na area de recursos hidricos, energeticos e ambientais, avaliando-se o uso de energia excedente de hidreletricas como alternativa para producao de hidrogenio

    Energy Technology Data Exchange (ETDEWEB)

    Mariotoni, Carlos Alberto; Naturesa, Jim Silva; Santos Junior, Joubert Rodrigues; Demanboro, Antonio Carlos [Universidade Estadual de Campinas (UNICAMP), SP (Brazil). Faculdade de Engenharia Civil. Grupo de Planejamento Energetico e Sistemas Eletricos]. E-mails: cam@fec.unicamp.br; jimnaturesa@yahoo.com; joubert.dos@terra.com.br; anto1810@fec.unicamp.br

    2006-07-01

    The researchers on energy, hydraulic and environmental subjects have been discussing the perspective and both the technical and economic viability of using the exceeding energy of hydroelectric power plants to produce hydrogen, taking into consideration the resources optimizations and the maximization of the economic gains. The researches and technicians of the Brazilian energy sector have considered, the increasing possibility of using of exceeding energy from hydroelectric power plants to produce hydrogen, mainly for the special case of the bi-national hydroelectric of Itaipu. Nevertheless it is important to present a discussion about the use and the production of hydrogen in Brazilian context considering, mainly, the consolidated experience of certain research centers and national laboratories. The paper also presents a discussions about the main technical characteristics, the electro electronic devices used and a brief discussion about the possibility of electric energy expansion, through the use of FACTS devices, for the southeast region of the country having the hydrogen as an important fuel. (author)

  8. Hydroelectric plant turbine, stream and spillway flow measurement

    Energy Technology Data Exchange (ETDEWEB)

    Lampa, J.; Lemon, D.; Buermans, J. [ASL AQ Flow Inc., Sidney, BC (Canada)

    2004-07-01

    This presentation provided schematics of the turbine flow measurements and typical bulb installations at the Kootenay Canal and Wells hydroelectric power facilities in British Columbia. A typical arrangement for measuring stream flow using acoustic scintillation was also illustrated. Acoustic scintillation is portable, non-intrusive, suitable for short intakes, requires minimal maintenance and is cost effective and accurate. A comparison between current meters and acoustic scintillation was also presented. Stream flow measurement is valuable in evaluating downstream areas that are environmentally important for fish habitat. Stream flow measurement makes it possible to define circulation. The effects of any changes can be assessed by combining field measurements and numerical modelling. The presentation also demonstrated that computational fluid dynamics modelling appears promising in determining stream flow and turbulent flow at spillways. tabs., figs.

  9. Analysis of the spontaneous variations in wind power and necessary continuous regulation of hydro-electric and thermal power, related to a future Swedish power system

    Energy Technology Data Exchange (ETDEWEB)

    Holm, J O; Lindstrom, P O

    1982-09-01

    Wind power is unlike conventional electric power generation, since the output fluctuates uncontrollably. These fluctuations must be balanced by controlled generation from other power sources. This will create new and interesting demands on the reserves in the power system. The short-term fluctuations have a low simultaneity factor and must be balanced by an automatic frequency control reserve. In Sweden, this consists of automatically controlled hydro-electric power. The report contains calculations of the amount by which the demand on reserves will increase when wind power is introduced.

  10. Innovation of power management structure in Czechoslovakia and nuclear power

    Energy Technology Data Exchange (ETDEWEB)

    Cibula, M

    1979-01-01

    The estimate is briefly indicated of power demand in Czechoslovakia till 1990 with the objective of attaining 142 mil. tonnes of specific fuel in that year. The demand will be met from domestic resources by 49%, exports by 44.2% and nuclear power by 6.8%. A brief comparison is presented of capital and fuel costs of brown coal fired power plants, hydroelectric plants and nuclear power plants in Czechoslovakia in 1990.

  11. State of art survey for design of medium frequency high power transformer

    DEFF Research Database (Denmark)

    Vaisambhayana, Sriram; Dincan, Catalin; Shuyu, Cao

    2016-01-01

    Medium and high frequency, high power transformers play an important role in footprint reduction along with their functions of galvanic isolation, and voltage transformation in all high power converters typically used in traction power systems, offshore wind plant power converters, and solid state...... transformer based distribution system grids. This state of art report analysis the various materials and design tradeoffs that govern the electromagnetic behavior and loss mechanisms of the medium frequency transformer applications. Typical winding and core geometries that have been reported extensively...

  12. Power Transformer Application for Wind Plant Substations

    Energy Technology Data Exchange (ETDEWEB)

    Behnke, M. R. [IEEE PES Wind Plant Collector System Design Working Group; Bloethe, W.G. [IEEE PES Wind Plant Collector System Design Working Group; Bradt, M. [IEEE PES Wind Plant Collector System Design Working Group; Brooks, C. [IEEE PES Wind Plant Collector System Design Working Group; Camm, E H [IEEE PES Wind Plant Collector System Design Working Group; Dilling, W. [IEEE PES Wind Plant Collector System Design Working Group; Goltz, B. [IEEE PES Wind Plant Collector System Design Working Group; Li, J. [IEEE PES Wind Plant Collector System Design Working Group; Niemira, J. [IEEE PES Wind Plant Collector System Design Working Group; Nuckles, K. [IEEE PES Wind Plant Collector System Design Working Group; Patino, J. [IEEE PES Wind Plant Collector System Design Working Group; Reza, M [IEEE PES Wind Plant Collector System Design Working Group; Richardson, B. [IEEE PES Wind Plant Collector System Design Working Group; Samaan, N. [IEEE PES Wind Plant Collector System Design Working Group; Schoene, Jens [IEEE PES Wind Plant Collector System Design Working Group; Smith, Travis M [ORNL; Snyder, Isabelle B [ORNL; Starke, Michael R [ORNL; Walling, R. [IEEE PES Wind Plant Collector System Design Working Group; Zahalka, G. [IEEE PES Wind Plant Collector System Design Working Group

    2010-01-01

    Wind power plants use power transformers to step plant output from the medium voltage of the collector system to the HV or EHV transmission system voltage. This paper discusses the application of these transformers with regard to the selection of winding configuration, MVA rating, impedance, loss evaluation, on-load tapchanger requirements, and redundancy.

  13. Efficiency assessment and benchmarking of thermal power plants in India

    International Nuclear Information System (INIS)

    Shrivastava, Naveen; Sharma, Seema; Chauhan, Kavita

    2012-01-01

    Per capita consumption of electricity in India is many folds lesser than Canada, USA, Australia, Japan, Chaina and world average. Even though, total energy shortage and peaking shortage were recorded as 11.2% and 11.85%, respectively, in 2008–09 reflecting non-availability of sufficient supply of electricity. Performance improvement of very small amount can lead to large contribution in financial terms, which can be utilized for capacity addition to reduce demand supply gap. Coal fired thermal power plants are main sources of electricity in India. In this paper, relative technical efficiency of 60 coal fired power plants has been evaluated and compared using CCR and BCC models of data envelopment analysis. Target benchmark of input variables has also been evaluated. Performance comparison includes small versus medium versus large power plants and also state owned versus central owned versus private owned. Result indicates poor performance of few power plants due to over use of input resources. Finding reveals that efficiency of small power plants is lower in comparison to medium and large category and also performance of state owned power plants is comparatively lower than central and privately owned. Study also suggests different measures to improve technical efficiency of the plants. - Highlights: ► This study evaluates relative technical efficiency of 60 coal fired thermal power plants of India. ► Input oriented CCR and BCC models of data envelopment analysis have been used. ► Small, medium and large power plants have been compared. ► Study will help investor while setting up new power projects. ► Power plants of different ownerships have also been compared.

  14. Slovak power stations, Nuclear Power Plants Mochovce (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Nuclear power plants Mochovce in 1997 is presented. These activities are reported under the headings: (1) Director's foreword; (2) Power plant management; (3) Highlights of 1997; (4) Capital construction; (5) Nuclear safety; (6) Radiation safety; (7) Work safety and health protection at work; (9) Fire protection; (10) Units upgrading - safety measures; (11) Maintenance; (12) Operation; (13) Environmental impacts of operations; (14) List of balances; (15) Human sources; (16) International co-operation; (17) Public relations

  15. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Mariano, S.J.P.S. [Beira Interior Univ., Covilha (Portugal). Dept. of Electromechanical Engineering; Mendes, V.M.F. [Superior Engineering Inst. of Lisbon, Lisbon (Portugal). Dept. of Electrical Engineering and Automation; Ferreira, L.A.F.M. [Technical Univ. of Lisbon, Superior Technical Inst., Lisbon (Portugal). Dept. of Electrical Engineering and Computers

    2008-07-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs.

  16. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2008-01-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs

  17. The renewal of hydroelectric concessions in competitive call

    International Nuclear Information System (INIS)

    2013-01-01

    This document discusses various issues associated with the planned competitive call on the French hydraulic power plants. The principles of this competitive call for hydroelectric concessions are first addressed: administrative regime of concessions, competitive call process, criteria of selection of the concession holder, case of 'concession of valleys', potential competitors. It outlines and discusses the difficulties of this competitive call: France is the single country to implement this procedure; it concerns a national asset; it questions the guarantee of a future use of equipment at best for the energy benefits of French consumers; the competitive call is a nice idea indeed but extremely complex. A note discusses the profitability aspects of Plants for Transfer of Energy by Pumping

  18. New advanced small and medium nuclear power reactors: possible nuclear power plants for Australia

    International Nuclear Information System (INIS)

    Dussol, R.J.

    2003-01-01

    In recent years interest has increased in small and medium sized nuclear power reactors for generating electricity and process heat. This interest has been driven by a desire to reduce capital costs, construction times and interest during construction, service remote sites and ease integration into small grids. The IAEA has recommended that the term 'small' be applied to reactors with a net electrical output less than 300 MWe and the term 'medium' to 300-700 MWe. A large amount of experience has been gained over 50 years in the design, construction and operation of small and medium nuclear power reactors. Historically, 100% of commercial reactors were in these categories in 1951-1960, reducing to 21% in 1991-2000. The technologies involved include pressurised water reactors, boiling water reactors, high temperature gas-cooled reactors, liquid metal reactors and molten salt reactors. Details will be provided of two of the most promising new designs, the South African Pebble Bed Modular Reactor (PBMR) of about 110 MWe, and the IRIS (International Reactor Innovative and Secure) reactor of about 335 MWe. Their construction costs are estimated to be about US$l,000/kWe with a generating cost for the PBMR of about US1.6c/kWh. These costs are lower than estimated for the latest designs of large reactors such as the European Pressurised Reactor (EPR) designed for 1,600 MWe for use in Europe in the next decade. It is concluded that a small or medium nuclear power reactor system built in modules to follow an increasing demand could be attractive for generating low cost electricity in many Australian states and reduce problems arising from air pollution and greenhouse gas emissions from burning fossil fuels

  19. Cordova Lake dam hydroelectric generating station case study

    International Nuclear Information System (INIS)

    Kerr, D.; Huxley, J.

    1993-01-01

    The Ontario Ministry of Natural Resources released a Crown owned site to the private water power industry as part of the small hydro site release program initiated by the Ontario Government in the mid 1980's. The Cordova Lake Dam Hydroelectric Generating Station, built on this site, has been in operation since the first week of October, 1992. Since that time, the plant has been operating with less than 1 % down time and has generated over 2,400 MWh of electricity. Algonquin Power Systems is responsible for the management and operations of the plant which includes full time monitoring from the company's Mississauga office and a part time employee at Cordova Lake. Cordova Lake Dam is located on the Crowe River at the outlet of Cordova Lake, approximately 125 kilometers east of Toronto, Ontario. The total cost of the Cordova Lake Dam project was $1.6 million. Algonquin Power contributed 20% equity to the project. Algonquin Power was also responsible for all engineering and geotechnical work and for completing the construction and equipment contracts. 1 tab., 2 figs

  20. Integral ordering of the River Vardar Valley

    International Nuclear Information System (INIS)

    Stavrov, Jordan

    2004-01-01

    From Skopje to Gevgelia, an annual quantity of 4,5 billions M 3 of water flows out of the territory through the Vardar River for only 60 hours. This poses two questions. The first is whether the flowing out of the water can be decelerated, i.e., whether the water can be kept for at least 60 days and the second question is how this can be realized. Construction of 12 hydroelectric power plants is envisaged along Vardar River, i.e., its section extending from Skopje to the border on Greece, which means within a length of 200 km. Two of these are classical hydroelectric power plants (HPP 'Veles' and HPP 'Gradec'), while the remaining 10 hydroelectric power plants are distributed in a cascade along the river course, with small water head of H = 8,20 - 8,50 m and are considered ecological hydroelectric power plants according to European criteria. For us, these represent a new technology of design and construction particularly considering the part referring to the equipment, while in Europe, there is assembly-line production of such equipment. Presented very briefly in the paper shall be the main technical information on these hydroelectric power plants, namely HPP Kukuricani, as a pilot project to be realized by AD ESM. (Author)

  1. 18 CFR 4.107 - Contents of application for exemption from licensing.

    Science.gov (United States)

    2010-04-01

    ... type of each hydraulic turbine of the small hydroelectric power project. (4) A description of how the... head of the power plant; (iii) The hydraulic capacity of each turbine of the power plant (flow through... capacity if the hydraulic capacity of proposed generating unit(s) plus the minimum flow requirements, if...

  2. New designs of medium power WWER reactor plants

    International Nuclear Information System (INIS)

    Ryzhov, S.B.; Mokhov, V.A.; Nikitenko, M.P.; Chetverikov, A.E.; Veselov, D.O.; Shchekin, I.G.; Petrov, V.V.

    2010-01-01

    The task of constructing NPPs as the objects of regional power industry is included into the Federal Target Program on nuclear power technologies of new generation for the period till 2020. Such NPPs are considered as perspective sources of energy for solution of the problems concerning provision of electric energy, household and industrial heat to the regions with limited capabilities of the power grid. OKB 'GIDROPRESS' present the conceptual study of RP design for the Unit of 600 MW (el.) power, taking into account their long-term experience in the field of development and operation of WWER reactor plants. Practical implementation of WWER-600 and WWER-300 RP designs seems to be feasible: practice in manufacturing the main equipment is available; cooperation of design, scientific organizations and manufacturers of equipment; is established; basic design solutions for equipment are of reference character

  3. Floristic and phytosociology in dense "terra firme" rainforest in the Belo Monte Hydroelectric Plant influence area, Pará, Brazil.

    Science.gov (United States)

    Lemos, D A N; Ferreira, B G A; Siqueira, J D P; Oliveira, M M; Ferreira, A M

    2015-08-01

    The objective of the present study was to characterise the floristic and phytosociological composition on a stretch of dense "Terra Firme" rainforest located in the Belo Monte hydroelectric plant area of influence, located in the state of Pará, Brazil. All trees with DAP >10 cm situated in 75 permanent plots of 1 ha were inventoried. 27,126 individuals trees (361 ind.ha-1), distributed in 59 botanical families, comprising 481 species were observed. The families with the largest number of species were Fabaceae (94), Araceae (65) and Arecaceae (43), comprising 43.7% of total species. The species Alexa grandiflora (4.41), Cenostigma tocantinum (2.50) and Bertholletia excelsa (2.28) showed the highest importance values (IV). The ten species with greater IV are concentrated (22%). The forest community has high species richness and can be classified as diverse age trees, heterogeneous and of medium conservation condition.

  4. Semiconductor-machine system for controlling excitation of synchronous medium power generators

    Energy Technology Data Exchange (ETDEWEB)

    Vrtikapa, G

    1982-01-01

    A system for controlling excitation (ARP-29/1) is described which was developed at the ''Nikola Tesla'' institute (Czechoslavakia) for rebuilding the Zvornik hydroelectric plant with 30 MV X A units. The system corresponds to the modern level of automation and considers positive characteristics of existing equipment, it is easily included in a technological process, has small dimensions and is easily installed during overhaul of a electric generating plant, and it allows one to obtain good economic results. Two years of use have confirmed the high reliability and quality of the excitation. The excitation control system consists of synchronous motor, excitation system, automatic control of voltage, manual control of excitation unit, unit for automatic following and switching, relay automatic device with protection and warning. The excitation system of the generator has: thyristor rectifier, thyristor converter, a bridge with thyristor control unit, machine excitation generator, switch for demagnetization. The excitation system is supplied from an electric power network or from a three phase generator with permanent magnets.

  5. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  6. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  7. Development of small and medium reactors for power and heat production

    International Nuclear Information System (INIS)

    Becka, J.

    1978-01-01

    Data are given on the current state of development of small and medium-power reactors designed mainly for electric power production in small power grids, for heat production for small- and medium-power desalination plants with possible electric power generation, for process steam production and heat development for district heating systems, again combined with electric power generation, and for propelling big and fast passenger ships. A diagram is shown of the primary system of an integrated PWR derived from the Otto Hahn reactor. The family is listed of the standard sizes of the integral INTERATOM company pressurized water reactors. Also listed are the specifications and design of CAS 2CG and AS 3G type reactors used mainly for long-distance heating systems. (J.B.)

  8. Impact of the construction of a hydroelectric power plant on the land cover and use: study of the basin Lajeado Bonito - RS; Impacto da construcao de uma usina hidreletrica no uso e cobertura da terra: estudo da bacia Lajeado Bonito-RS

    Energy Technology Data Exchange (ETDEWEB)

    Tramontina, Juliana; Breunig, Fabio Marcelo [Universidade Federal de Santa Maria (UFSM), RS (Brazil)

    2015-07-01

    This work aims to analyze the impact of the construction of a hydroelectric power plant on land cover and use in Lajeado Bonito-RS watershed. The study evaluated the temporal evolution of land cover and use in the watershed for the period before and after to installation of hydroelectric plant Foz do Chapeco (2009 to 2010). For temporal analysis, two images were interpreted, one orbital image of High Resolution Camera (HRC) onboard of the CBERS-2B, acquired in December 29, 2009. And a high-resolution image obtained from Google Earth application, acquired at December 26, 2010. The land cover and use maps were generated by vector editing SPRING software. We found that the predominant land use related to agriculture and livestock, including bare soil. In 2009 this class accounted for 70.23% of the total area, while it come to represent 61.8% in 2010. At the same time, there was increase of areas with native forest cover, from 27.49% covered by forest in 2009, to 31% in 2010. The results showed that in both 2009 and 2010 years, approximately 49% of permanent preservation area were used inappropriately. (author)

  9. Determination of 93Zr in medium and low level radioactive wastes from Brazilian nuclear power plants

    International Nuclear Information System (INIS)

    Oliveira, Thiago C.; Oliveira, Arno H.

    2015-01-01

    The majority of long-lived radionuclides produced in the nuclear power plants can be regarded as difficult-to-measure radionuclides (RDM), hence chemical separation is necessary before the nuclear measurement of them. The zirconium isotope 93 Zr is a long-lived pure β-particle-emitting radionuclide produced from 235 U fission and from neutron activation of the stable isotope 92 Zr and thus occurring as one of the radionuclides found in nuclear reactors. Due to its long half-life, 93 Zr is one of the radionuclides of interest for the performance of assessment studies of waste storage or disposal. Two different methodologies based on extractive resins and LSC and ICP-MS techniques that enables the 93 Zr determination in medium (ILW) and low level (LLW) radioactive wastes samples from Brazilian nuclear power plants has been developed in our laboratory. Analyzing real samples 65% and 75% chemical yields for 93 Zr recovery were achieved for ICP-MS and LSC techniques, respectively. The detection limits were 0.045 μg.L -1 for ICP-MS and 0.05 Bq.L -1 for LSC techniques. (author)

  10. Standardized small diesel power plants for rural electrification in Tanzania

    International Nuclear Information System (INIS)

    Holmqvist, A.; Soerman, J.; Gullberg, M.; Kjellstroem, B.

    1993-01-01

    This study focuses on small townships where the forecasted power demand stays below 500 kW during the ten first years. Case study calculations were made where two hypothetical load centres form the base. Each load centre is assumed to be supplied by two alternative standardized diesel power plants. One option is a power plant consisting of two medium speed (750 rpm) generator sets, one always on stand-by. Alternatively, a power plant consisting of three high speed (1500 rpm) generator sets is evaluated for each hypothetical load centre. The calculations clearly show that the high speed, three unit option comes out cheaper than the two unit, medium speed option in all the considered cases. The fuel costs per kWh generated are almost the same in all the cases studied, i.e. between 6 and 7 US cents. The medium speed engine tends to consume more fuel per kWh generated than the high speed, as it runs more often on part load. Consequently, the fuel costs will be slightly higher for this option. It is also of interest to compare the plant failure rate of the two options. In this study no proper probability evaluation has been made, but some general reflections can be worth considering. The availability of spare parts in Tanzania is doubtful. Many small diesel power plants presently operating have to wait indefinitely, when a failure appears that requires spare parts. As long as the individual sets have the same, or nearly the same failure rate, a three unit plant has lower probability for total loss of generating capacity than a two unit plant. The main conclusion of this evaluation is that for electricity generation in rural Tanzanian villages, power plants with three small, high speed generator sets are preferable to plants with two, medium speed generator sets. A power plant made out of small sets requires less capital, consumes less fuel and is not as likely to loose its generating capacity totally. 16 refs, 10 figs, 21 tabs

  11. Switching power converters medium and high power

    CERN Document Server

    Neacsu, Dorin O

    2013-01-01

    An examination of all of the multidisciplinary aspects of medium- and high-power converter systems, including basic power electronics, digital control and hardware, sensors, analog preprocessing of signals, protection devices and fault management, and pulse-width-modulation (PWM) algorithms, Switching Power Converters: Medium and High Power, Second Edition discusses the actual use of industrial technology and its related subassemblies and components, covering facets of implementation otherwise overlooked by theoretical textbooks. The updated Second Edition contains many new figures, as well as

  12. Integrity evaluation of Alloy 600 RV head penetration tubes in Korean PWR plants

    International Nuclear Information System (INIS)

    Kang, Young Hwan; Park, Sung Ho; Hong, Sung Yull; Choi, Kwang Hee

    1995-01-01

    The structural integrity assessment of Alloy 600 RV head penetration tubes has been an important issue for the economical and reliable operation of power plants. In this paper, an overview of the integrity evaluation program for the RV head penetration tubes in Korean nuclear power plants is presented. Since the crack growth mechanism of the penetration tube is due to the primary water stress corrosion cracking (PWSCC) which is mainly related to the stress at the tube, the present paper consists of three primary activities: the stress evaluation, the flaw evaluation, and data generation through material and mechanical tests. (author). 5 refs, 2 figs, 1 tab

  13. Hydroelectric plants: economical and ecological consequences of equipment and exploitation variants

    International Nuclear Information System (INIS)

    Maire, P.; Bansard, J.F.; Do, T.

    1995-01-01

    The increasing number of renewal demands for hydroelectric plants authorizations has raised the question of the pertinency and efficiency of the equipments used. Choices are rarely clearly justified by the petitioners. After reminding the reasons and consequences of a given choice and equipment, the necessary steps of an authorization demand are illustrated by a concrete case. It shows that some equipment-management combinations can lead to a more satisfying economical and ecological balance-sheet than those generally proposed. The popularization of computer use allows the examining services to dispose of clear and pedagogical elements to select the regular choices. (J.S.). 10 refs., 11 figs., 2 tabs

  14. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  15. Safety in Swiss nuclear power plants

    International Nuclear Information System (INIS)

    Cederqvist, H.

    1992-01-01

    Safety-related facilities and equipment are continuously backfitted in Swiss nuclear power plants. In the Beznau-1 and -2 nuclear generating units, the measures taken under the heading of 'Backfitting of Emergency Systems' included provisions to enhance the protection against earthquakes, airplane crash, and fire; in addition, the emergency power system was upgraded. In Muehleberg, the stack exhaust air monitoring system was optimized. The containment pressure suppression system of the plant has been designed to withstand a hypothetical accident exceeding the design basis. The BKM-Crud computer simulation model simulates steps taken to reduce radiation exposure. The power of Swiss nuclear power stations will be raised by 4% to 15% within the 'Energy 2000' action program. (orig.) [de

  16. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  17. Replacement of the old hydropower plant Ruppoldingen by new construction: More power in harmony with nature. Ersatz des alten Kraftwerkes Ruppoldingen durch Neubau: Mehr Strom im Einklang mit der Natur

    Energy Technology Data Exchange (ETDEWEB)

    Aemmer, F; Zimmermann, C; Inderbitzin, R [Atel, Aare-Tessin AG fuer Elektrizitaet, Olten (Switzerland)

    1992-02-21

    The Aare-Tessin AG fuer Elektrizitaet (Atel) at Olten intend to construct a new run-of-river power plant at Ruppoldingen above the Aareblick restaurant. The new plant will replace the present hydroelectric power plant, which is new nearly 100 years old and whose operating permit will run out in 1994. The article gives an outline of the power plant project. The new plant will have three times the power of the old plant; protection of nature will be ensured by a number of measures.(orig.).

  18. The winning cards of small-scale hydroelectric power in the prevention of greenhouse effect

    International Nuclear Information System (INIS)

    Chabot, B.

    1991-01-01

    Among global environment problems, the risk of global warming is one of the most important. This risk and the associated climatic or socio-economic disorders are in relationships with the growth of greenhouse gases content in the atmosphere, connected with massive fossil fuels uses. This paper presents the advantages of small-scale hydroelectric power, often ignored, which can be a substitution energy source. 14 refs., 4 figs

  19. Hydroelectric power development and the ice regime of inland waters: A northern community perspective

    International Nuclear Information System (INIS)

    Gerard, R.

    1989-03-01

    Inland waters play a vital role in the life of the many small northern communities which depend in large measure on the provisions of the natural environment for their sustenance. These communities are therefore particularly vulnerable to changes in the ice regime of these waters, especially changes that are irregular. However, the north is also the site of much of Canada's hydroelectric power development and potential, developments that have a major influence on the ice regime of effected waters. As a contribution to the background information required for the necessary discussions and negotiations associated with such developments, the various aspects of the natural ice regime, the possible effects of hydroelectric development and operation on this regime, and its consequences, are briefly reviewed. The emphasis has been placed on changes that will likely be of most significance to northern communities in the bedrock-controlled country of the western Canadian Shield. The major direct, and in some circumstances life-threatening, impact of changes to the ice regime is on trafficability of the iceways that play such a vital role in the life of the communities. Hence particular emphasis has been placed on this aspect and on the formation of the slush and thin ice conditions that are the bane of over-ice travel and that are subject to unexpected changes by hydroelectric development and operation. To place these changes and their effects in some perspective, the nature of a hydroelectric development is also briefly described and an effort made to indicate the large costs incurred if these developments are restrained in their operation to avoid or mitigate some of the effects on the ice regime. 31 refs., 57 figs., 1 tab

  20. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  1. Optimal control of hydroelectric facility incorporating pump storage

    International Nuclear Information System (INIS)

    Zhao, Guangzhi; Davison, Matt

    2009-01-01

    We consider a simple model of a pump-assisted hydroelectric facility operating in a market with time-varying but deterministic power prices and constant water inflows. The engineering details of the facility are described by a model containing several parameters. We present an algorithm for optimizing first the energy and then the profit produced by these plants. This algorithm allows us to describe the relationships between control trajectory and time, and between inflow and price. Remarkably, we see that under some reasonable choices of facility parameters and for power prices that are not extremely variable, the optimal profit operation of these facilities is not too different from their optimal energy operation, and the control is less affected by the price as the inflow rate increases. (author)

  2. Head losses in small hydropower plant trash racks (SHP

    Directory of Open Access Journals (Sweden)

    N. Walczak

    2016-12-01

    Full Text Available Small hydropower plants (SHP are technical facilities that are part of alternative energy sources [Paish 2002]. They are primarily characterised by low unit power (in Poland below 5 MW and are often constructed on existing barrages. Electrical current produced by these plants is used to meet local demand. Considering the exploitation of SHPs, it is important to ensure a stable flow through turbines. Aggidis et al. [2010] analysed SHP equipment costs depending on the turbine set. The turbines are protected against damage with trash racks applied for capturing water-borne detritus, such as plant debris carried by water. However, trash racks as solid equipment of SHPs cause head losses, and as a consequence reduce the efficiency of the system. These losses result not only from the spacing of bars, their shape and the technical condition of the inlet chamber, but also from plant debris, its nature, and the quantity of accumulated material that effectively limits the flow. The plant debris captured on trash racks is characterised by diversity in terms of species composition related to the vegetation period and the area where hydraulic facilities are located. Therefore, it is important to maintain trash racks clean by regular removal of the accumulated material. In this context, modernised and newly built power plants are fitted with mechanical cleaners. In older facilities, manual intervention for regular cleaning is required. The present study analyses how the bar shape and the orientation angle of trash racks as well as the accumulated plant debris affect head losses. The results were obtained from laboratory tests. The research examined the impact the inclination angle of trash racks (30°, 60° and 80° has on head loss values for three different shapes of bars (cylindrical, angled and flat rectangular and various weight portions of plant debris (0.25, 0.375 and 0.5 kg. The summarised losses were determined by measuring the difference in water

  3. Change in Anopheles richness and composition in response to artificial flooding during the creation of the Jirau hydroelectric dam in Porto Velho, Brazil.

    Science.gov (United States)

    Rodrigures, Moreno S; Batista, Elis P; Silva, Alexandre A; Costa, Fábio M; Neto, Verissimo A S; Gil, Luiz Herman S

    2017-02-22

    Anopheles mosquitoes are the only vectors of human malaria. Anopheles species use standing water as breeding sites. Human activities, like the creation of an artificial lake during the implementation of hydroelectric power plants, lead to changes in environmental characteristics and, therefore, may changes the species richness and composition of Anopheles mosquitoes. The aim of the present study was to verify whether or not there is an association between the artificial flooding resulting from the construction of the Jirau hydroelectric power plant, and the richness and composition of anophelines. Mosquitoes samples were obtained monthly from the Jirau hydroelectric power plant area located at Porto Velho, Rondônia State, using Human Landing Catch (06:00-10:00 PM). Mosquitoes collected were transported to Laboratório de Entomologia Médica FIOCRUZ-RO where they were identified until species using dichotomous key. A total of 6347 anophelines belonging to eight different species were collected. The anophelines species richness was significantly lower during the first flooding stage. Differences in anophelines species composition were found when comparing the first flooding stage with the other stages. Furthermore, the mean number of Anopheles darlingi, the main vector of malaria in the region, increases during the first and the third flooding stages. The continual monitoring of these vectors during the late operational phase may be useful in order to understand how anophelines will behave in this area.

  4. Optimization of the Energy Output of Osmotic Power Plants

    Directory of Open Access Journals (Sweden)

    Florian Dinger

    2013-01-01

    Full Text Available On the way to a completely renewable energy supply, additional alternatives to hydroelectric, wind, and solar power have to be investigated. Osmotic power is such an alternative with a theoretical global annual potential of up to 14400 TWh (70% of the global electricity consumption of 2008 per year. It utilizes the phenomenon that upon the mixing of fresh water and oceanic salt water (e.g., at a river mouth, around 2.88 MJ of energy per 1 m3 of fresh water is released. Here, we describe a new approach to derive operational parameter settings for osmotic power plants using a pressure exchanger for optimal performance, either with respect to maximum generated power or maximum extracted energy. Up to now, only power optimization is discussed in the literature, but when considering the fresh water supply as a limiting factor, the energy optimization appears as the challenging task.

  5. Atmospheric emissions : hydro-electricity versus other options

    International Nuclear Information System (INIS)

    Chamberland, A.; Belanger, C.; Gagnon, L.

    1996-01-01

    One of the great environmental advantage offered by hydro-electricity in northern or temperate climates includes reduced atmospheric emissions. While natural gas plants, from an environmental viewpoint, are thought to be the best fossil fuel option, they emit 18 times more greenhouse gases, at least 60 times more sulfur dioxide and hundreds of times more nitrogen oxides than do hydro-electric systems. The relative SO 2 and greenhouse gas emissions from energy systems in Canada were outlined, and their environmental impacts were described. At the same time, mention was made of other environmental pollutants, such as acid rain, photochemical smog, and particulates that continue to have major impacts on the environment, but were displaced as the focus of attention by greenhouse gases. A study was conducted to determine the effects of extreme biomass decomposition and greenhouse gas emissions from reservoirs. The study showed that at depths of more than 10 centimeters below water surface, organic matter does not contribute to greenhouse gas production, even at 20 degrees C. It was demonstrated that even when maximum biomass decomposition is assumed, a modern natural gas plant would emit 14 times more green house gases than a hydroelectric plant of comparable capacity. 13 refs., 4 tabs., 3 figs

  6. Wind as a feasible alternative source for improving the deficiency of hydroelectricity in Tanzania

    International Nuclear Information System (INIS)

    Kainkwa, R. M.

    2006-01-01

    Hydroelectricity is the main source of electricity in Tanzania since about 86% of the electricity generated is from this source. During the dry season there is normally a storage of water in the dams and as such the electricity generated is below the demand. In 2004 a natural gas power plant was inaugurated to alleviate this shortage of electricity. When generating electricity from natural gas, exotic gases are emitted which pollute our environment. This source of energy also cannot regenerate itself within the human life scale. Wind is a renewable source that can be used to supplement the shortage of hydroelectricity in Tanzania. Wind speed data collected from a location with high wind energy potential shows that electricity can be generated from the wind to alleviate this shortage of hydroelectricity. Wind and rainfall data demonstrate further that the windy season, which is from July to November coincide with the dry season in which the use of wind energy in electric generation can help to fill the gap of the hydroelectricity that prevails during that season. The use of wind instead of natural gas will reduce the environmental pollution that results from extracting energy from the fossil fuel source.(Author)

  7. Sustainable siting procedure of small hydroelectric plants: The Greek experience

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Maria, Efpraxia; Mathioudakis, Vassilis

    2007-01-01

    This paper aims to present the procedure under which a sustainable plant, like a small hydroelectric plant (SHP), can be installed and deployed, especially in countries with complicated administrative and legislative systems. Those must be defined by the rules that characterize sustainable spatial planning, which aims at the environmental protection, the insurance of better living conditions and finally at the economic development within the frame of the principle of sustainability and its three basic dimensions: social, economical and environmental. The main principles of spatial planning are accepted from the jurisprudence of the Hellenic Council of State, either as an appropriate condition for the protection of important ecosystems or as specific expression of the principle of prevention of environmental damage. In this framework it is accepted that the development is experienced, initially to a total and general planning, whose essential part is the assessment and modification of distributed land uses. Besides, the main characteristics of the siting of SHPs and the criteria demanded for their smooth integration and operation are presented

  8. Bidding strategy for pumped-storage plant in pool-based electricity market

    International Nuclear Information System (INIS)

    Kanakasabapathy, P.; Shanti Swarup, K.

    2010-01-01

    This paper develops optimal bidding strategies for a pumped-storage plant in a pool-based electricity market. In the competitive regime, when compared to simple hydroelectric generator, profit of the pumped-storage plant is maximized by operating it as a generator when market clearing price is high and as a pump when the price is low. Based on forecasted hourly market clearing price, a multistage looping algorithm to maximize the profit of a pumped-storage plant is developed, considering both the spinning and non-spinning reserve bids and meeting the technical operating constraints of the plant. The proposed model is adaptive for the nonlinear three-dimensional relationship between the power produced, the energy stored, and the head of the associated reservoir. Different operating cycles for a realistic pumped-storage plant are considered and simulation results are reported and compared. (author)

  9. Enlarging the underground hydroelectric plant at Villarino, Spain

    Energy Technology Data Exchange (ETDEWEB)

    Oriard, L.L.

    1997-05-01

    Near the village of Villarino de los Aires, in the province of Salamanca, Spain, was an existing underground hydroelectric power plant. A major enlargement was undertaken to increase the electrical generating capacity, under a contract awarded to a joint venture of Dragados y Construcciones, S. A. (Spain), Entrecanales y Tavora, S. A. (Spain), and S.A. Conrad Zschokke (Switzerland). The enlargement required the excavation of a large and complex underground system of tunnels, shafts and chambers adjacent to existing facilities and interconnected with these facilities. The existing machine hall and transformer chamber were both extended, requiring the blasting of the existing end walls. The drilling, blasting and excavating of the underground system had to be done without damage to existing underground chambers and tunnels, or any of the existing structures, equipment or instrumentation facilities, often within just a few feet of the blasting. This required careful control of vibrations, airblast overpressures and dust. Because the only available non-electric detonating systems were found to be unreliable and unsafe, electric systems would be preferred if they could be used in a safe manner at this site. High electrical potentials existed at the site, and the facilities could not be shut down. Electrical fields were studied carefully, both in the underground environment and above the ground surface. Based on these results, it was concluded that electric detonators could be used if special blasting procedures were developed and followed. In accord with contracting practices of this Spanish agency, the contract was not awarded to the lowest bidder, but to the bidder who demonstrated the best understanding of the project and who presented the best technical proposal for conducting the work to a conclusion that would be satisfactory to the owner. The development of the technical proposal was a two-month effort for a technical group and support staff, prepared in Madrid.

  10. Environmental impact analysis of the hydroelectric power development sheme in the River Grunnaai in Seljord municipality, Telemark; Konsekvensutredning av kraftutbyggingsprosjekt i Grunnaai i Seljord, Telemark

    Energy Technology Data Exchange (ETDEWEB)

    Muniz, I.P.; Bendiksen, E.; Erikstad, L.; Reitan, O.

    1997-12-31

    This report discusses the possible environmental consequences of a planned hydroelectric power development of the river Grunnaai, Norway. The consequences are found to be small, provided the proper counter measures are taken. Without counter measures, there may be moderate consequences on fish populations and botanical conditions, directly dependent on the changed water flow. The greatest value of the area concerned lies in its unspoiled wilderness character. There are extensive lists of birds and mammals and plant species registered in the river valley. 51 refs., 7 figs., 4 tabs.

  11. The Innavik hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    St-Pierre, S.; McNeil, E.; Gacek, J. [RSW Inc., Montreal, PQ (Canada); Atagotaaluk, E. [Pituvik Landholding Corp., Nunavik, PQ (Canada); Henderson, C. [Lumos Energy, Ottawa, ON (Canada)

    2009-07-01

    The village of Inukjuak in northern Quebec is not connected to the main electrical grid. This remote village is one of 14 Inuit communities in the Nunavik administrative region where electricity is generated by diesel thermal power plants under the direction of Hydro-Quebec Distribution's Isolated Grid subdivision. The heating of water and buildings is supplied by heavy fuel-oil. A compensation program for the price of fuel-oil is applied in the community. This presentation discussed the need for developing renewable energy sources in order to respond to the energy demands of isolated grids. The community of Inukjuak plans on developing the water resources of the Inukjuak River in order to produce hydroelectricity and reduce the use of diesel fuel. Several possible development sites were identified. The project will contribute to a reduction in energy costs while reducing greenhouse gas emissions. Revenues generated from the power plant will help the village in their economic development by enabling the completion of various community projects. The sustainable development approach taken for the project was discussed and the project's main technical, environmental and social issues were identified. The project is expected to reduce the production of an estimated 8 tons of carbon dioxide emissions by 2011 and nearly 15 tons after 10 years of operation.

  12. Feasibility study for the partial conversion of a hydropower plant into a pumped-storage power plant: a case study of hydroelectric power plant La Barca (Asturias, Spain

    Directory of Open Access Journals (Sweden)

    E. Antuña Yudego

    2017-01-01

    Full Text Available Renewable energy sources have reported an unprecedented increase of global installed renewable power capacity. Against the advantages provided by this renewable power generation technology it should be taken into account an important issue: these intermittent energy sources supply a fluctuating output which is difficult to manage. Pumped-storage hydro power plants reappear in these circumstances as an efficient form of energy storage which allows to use reserves when necessary, enabling power generation output to cover continuously this energy demand. The present paper shows a simplified feasibility study of the partial conversion of hydropower plant La Barca, in Asturias, into a reversible storage through the development of an algorithm to simulate its operation according to electricity market prices. For this purpose, the operation in the deviation management market is considered and the technical modifications required for the conversion are shown. The estimation of costs and incomes present a feasible scenario.

  13. Comparative study of the impacts of hydroelectric power plants with impacts avoided by a Virtual Plants Equivalents (VPEs) through of energy efficiency actions; Estudo comparativo dos impactos das usinas hidreletricas com os impactos evitados por uma usina virtual equivalente atraves das acoes de eficiencia energetica

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Roberto Perillo Barbosa da; Barros, Regiane Silva de [Universidade Estadual de Campinas (FEM/UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica], emails: rpbsilva@fem.unicamp.br, rsbarros@fem.unicamp.br Rossi, Luiz Antonio [Universidade Estadual de Campinas (FEAGRI/UNICAMP), SP (Brazil). Fac. Engenharia Agricola], email: rossi@feagri.unicamp.br

    2010-07-01

    This article presents a comparative study of the impacts caused by Hydroelectric Power Plants (HPPs) in relation to the impacts avoided through actions that promotes energy efficiency called Virtual Plants Equivalents (VPEs). To do so, it was considering the recent results presented by the National Program for Electric Energy Conservation (PROCEL) to the year 2008, which shows that the program actions' in this period resulted in a Virtual Plant Equivalent of 1049 MW. It was performed a survey of the values of wetland and families displaced by the construction of hydropower plants and, later, it was compared these data with the values found in the literature and, finally, it was established that the actions of energy efficiency are important instruments to avoid (or at least postpone) the social and environmental impacts directly and indirectly that affects the whole society. Thus, it is suggested that there is a stimulus in relation to energy efficiency actions, what is observed nowadays in Brazil is that these actions are negligible before the potential that exists at industrial, commercial and residential sectors. (author)

  14. Comparison between Brazilian and Portuguese energy sceneries considering the importance of small hydroelectric power plants; Comparacao entre os cenarios energeticos brasileiros e portugueses considerando-se a implantacao de PCH's - Pequenas Centrais Hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Mariotoni, Carlos Alberto [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mail: cam@fec.unicamp.br; Mauad, Frederico Fabio [Sao Paulo Univ., Sao Carlos, SP (Brazil). Escola de Engenharia. Dept. de Hidraulica e Saneamento

    2000-07-01

    Both the Brazilian and the Portuguese energy systems have been subject of several transformations along the last years. That happened mainly because the re-definition of the electric sectors what makes possible the flexibility of the energy commercialization. There is another important point to be mentioned what is related to the end of the market monopoly before established by ELETROBRAS - Brazilian Electricity Generation Board and by EDP - Electricity of Portugal, determining a new relationship among the energy produces and consumers. A free market law to the energy sellers and buyers has been introduced. Therefore the businessman have been stimulated to invest in new energy sources and new energy power plants to get bigger profits as well as the consumers have been pushed to fight for lower prices and better qualities. Both the Brazilian and Portuguese Governments must keep the decision power to establish the national energy plans to get the country economic targets and to avoid the economic abuses and cartelization. The discussion presented aims to analyze the importance of the small hydroelectric power plants in both the Brazilian and the Portuguese electric systems considering the economic aspects and the social and environmental impacts. The recent modifications established by both national agencies of energy regulations: ANEEL (Brazil) - National Agency of Electric Power Companies and INAG (Portugal) - National Institute of Water, have been discussed in this paper. (author)

  15. EPRI releases strategic plan for hydroelectric R and D

    International Nuclear Information System (INIS)

    Fickett, A.P.

    1993-01-01

    The Electric Power Research Institute has published a report identifying important research needs and issues in the hydroelectric industry. The report is based on results from a survey of representatives of the 1992 North American hydroelectric community. EPRI conducted the survey to expand upon recommendations of the North American Hydroelectric R ampersand D Forum and to develop EPRI's agenda. The report, an EPRI Strategy for Hydropower Research and Development: Rethinking our Water Resource Management Strategies, outlines an agenda for improving the use of water resources and expanding hydroelectric production at existing dams. It also proposes a new, expanded EPRI strategy within the context of the future energy needs of the US and the North American hydro research agenda

  16. 76 FR 75543 - Castle Creek Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... (FPA), proposing to study the feasibility of the Castle Creek Hydroelectric Project to be located on... be located adjacent to the original hydroelectric plant, with a single shaft Pelton turbine...

  17. Analytical Investigation and Control System Set-up of Medium Scale PV Plants for Power Flow Management

    Directory of Open Access Journals (Sweden)

    Rosario Miceli

    2012-11-01

    Full Text Available In the field of photovoltaic (PV plants and energy conversion from renewable sources, a large part of the technical literature is more devoted to practical aspects (new solar cells, electrically driven PV panels, safety, reduction of parasitic currents, etc. than to theoretical investigations. Despite this tendency, this paper presents a mathematical analysis of a medium scale photovoltaic power generation system connected to the distribution network and of its control system. In such a system, the conversion stage is unique due to the absence of a boost chopper. The conducted analysis leads to the interesting conclusion that the inverter used in the plant presents two degrees of freedom, easy to exploit in a control system in which the inverter simultaneously realizes the interconnection to the grid and the MPPT control. The structure of the control system is then presented, discussed and validated by means of numerical simulations.

  18. Study of National Electric System equipment until 2000 year

    International Nuclear Information System (INIS)

    1980-01-01

    The report by the German firm Lahmeyer International is about the historical development of the supply of Electric Power, description of the current system, previous studies, organization, power plants, hydroelectric plants and existing construction, transmission system, hydrological studies and water resources, operation of hydro thermal generation, medium-term demand, energy sources and generation in the medium term, list of thermal plants, evaluation of alternative equipment plans in Uruguay at a med dium term.

  19. Adding a small hydroelectric power plant to the drinking water supply of the Liddes community. Feasibility study; Installation d'une petite centrale hydraulique sur le reseau d'eau potable de la commune de Liddes. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The actual drinking water supply no longer satisfies the needs of the Liddes community (southwestern Switzerland). This final report prepared for the Swiss Federal Office of Energy (SFOE) describes the results of a study for an enhanced water supply system including a small hydroelectric power plant. The authors propose to collect the water of two sources of the mountain torrent Aron and to use the considerable pressure difference for power generation. Four variants have been studied differing in the exact height difference, the flow rate and the location of the turbine building. The recommended variant delivers a nominal flow of 18 l/s at difference in height of 377 m to a Pelton turbine equipped with a single injector, resulting in an electrical power output of 54 kW. Electrical power production would amount to 281,000 kWh/year and the production cost to 0.126 CHF/kWh.

  20. Offshore Wind Power Plant Technology Catalogue - Components of wind power plants, AC collection systems and HVDC systems

    DEFF Research Database (Denmark)

    Das, Kaushik; Antonios Cutululis, Nicolaos

    2017-01-01

    Traditionally, Offshore Wind Power Plants (OWPPs) are connected through many com-ponents as shown in the figure 1. An OWPP consists of controllable, variable speed Wind Turbines (WTs). These WTs are connected through Medium Voltage (MV) sub-marine cables typically at voltage level of upto 33-66 k...... for the cables as well reduce the power losses through them....

  1. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    Energy Technology Data Exchange (ETDEWEB)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  2. Floristic and phytosociology in dense “terra firme” rainforest in the Belo Monte Hydroelectric Plant influence area, Pará, Brazil

    Directory of Open Access Journals (Sweden)

    DAN. Lemos

    Full Text Available Abstract The objective of the present study was to characterise the floristic and phytosociological composition on a stretch of dense “Terra Firme” rainforest located in the Belo Monte hydroelectric plant area of influence, located in the state of Pará, Brazil. All trees with DAP >10 cm situated in 75 permanent plots of 1 ha were inventoried. 27,126 individuals trees (361 ind.ha-1, distributed in 59 botanical families, comprising 481 species were observed. The families with the largest number of species were Fabaceae (94, Araceae (65 and Arecaceae (43, comprising 43.7% of total species. The species Alexa grandiflora (4.41, Cenostigma tocantinum (2.50 and Bertholletia excelsa (2.28 showed the highest importance values (IV. The ten species with greater IV are concentrated (22%. The forest community has high species richness and can be classified as diverse age trees, heterogeneous and of medium conservation condition.

  3. The challenge of introducing HTR plants on to the international power plant market

    International Nuclear Information System (INIS)

    Bogen, J.; Stoelzl, D.

    1987-01-01

    The international power plant market today is characterized by high increase in energy consumption for developing countries with limitations of investment capital and low increase in energy consumption for industrialized countries with limitations of additional power plant capacities. As a consequence there is a low demand for large new power stations. This leads to a tendency for small and medium sized power plant units - meeting high environmental standards - for which the total investment volume is low and full load operation of a plant can be realized earlier due to the small block capacity. - For nuclear power plants the High-Temperature-Reactor (HTR)-line with spherical fuel elements and a core structure of graphite is specially suited for this small and medium sized nuclear reactor (SMSNR) capacity. The excellent safety characteristics, the high availability, the low radiation doses for the operation personnel and the environment of the HTR line has been demonstrated by 20 years of operation of the AVR-15 MWe experimental power plant in Juelich F.R.G. and since 1985 by operation of the THTR-300 MWe prototype plant at Hamm-Uentrop F.R.G. Up-dated concepts of the HTR-line are under design for electricity generation (HTR-500), for co-generation of power and heat (HTR-100) and for district heating purposes only (GHR-10). By implementing two HTR projects the Brown Boveri Group is in the position to realize the collected experiences from design, licensing, erection, commissioning and operation for the follow-on projects. This leads to practical and sound technical solutions convenient for existing manufacturing processes, well known materials, standardized components and usual manufacturing tolerances. Specific plant characteristics can be used for advantages in the competition. (author)

  4. Estimation of an Effective Young’s Modulus of Elasticity in the Locality of the Gabčíkovo Hydrology Power Plant by Geometric Leveling

    Directory of Open Access Journals (Sweden)

    Mojzeš Marcel

    2015-03-01

    Full Text Available The Gabčíkovo hydroelectric power plant is located in a complicated geological environment (gravel sub-soil and a high groundwater level. Excavation work started after the withdrawal of water in the autumn of 1984 and lasted until the autumn of 1986. A basic geodetic control network with a special monument was founded before the excavation work began. This network served for the setting-out of the hydroelectric power plant as well as for the control of the excavation work. The repeated geodetic control measurements have been evaluated and presented at many seminars and conferences. Monitoring the horizontal and vertical stability of the geodetic control network during the general site excavation showed significant horizontal and vertical deformations. The paper is focused on an estimation of an effective Young's modulus of elasticity in the area studied.

  5. Power plant selection for medium to high enthalpy geothermal resources of Turkey

    International Nuclear Information System (INIS)

    Kivanc Ates, H.; Serpen, U.

    2016-01-01

    A geothermal power plant model depends on the variations not only the temperature, but also, geochemical, and physical features of resources. Most of the geothermal brines in the world and in our country contain dissolved minerals and NCGs (non-condensable gases). These minerals precipitate from the solution and non-condensable gases flash depending on the changes of temperature and pressure during production and re-injection processes. In this study, common geochemical characteristics of geothermal resources of Turkey are briefly mentioned; chemical conditions for operation and re-injection processes are discussed. Taking into account of the above features, “combined power plants” devised by a combination of single-double flash processes with atmospheric condenser and “binary” cycles are introduced. They are compared thermodynamically and economically with each other and the ones from previous studies. Power capacity and efficiency of Combined Cycle Model-2 have been found 38.13 MWe and 14.1%, respectively. Combined Cycle Model-3 with single flash atmospheric process and binary presents these figures as 37.20 MWe and 13.4%, respectively. Economically, although the previous model has a slight edge in ROR (rate of return) (27.5% over 27%) the second one should be preferred because of potential silica scaling potential problem in the first one. - Highlights: • Combined power plant designs have superiority over conventional ones both in efficiency and power production. • Economics on power plants point out similar results. • Reservoir chemistry (CO_2 content and silica scaling) largely favors the combined power plant selection.

  6. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 3. Mid-Continent region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The US Corps of Engineers' assessment of the nation's hydroelectric resources provides a current and comprehensive estimate of the potential for incremental or new generation at existing dams and other water resource projects, as well as for undeveloped sites in the US. The demand for hydroelectric power is addressed and various related policy and technical considerations are investigated to determine the incentives, constraints, and impacts of developing hydropower to meet a portion of the future energy demands. The comprehensive data represent the effort of the Corps of Engineers based on site-specific analysis and evaluation. Summary tables include estimates of the potential capacity and energy at each site in the inventory. The number of sites and potential capacity in each state are identified, but specific detailed information is included for sites in Colorado, Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, and Wyoming.

  7. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Federal Power Act (FPA), proposing to study the feasibility of the Scooteney Outlet Drop Hydroelectric..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  8. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 1. Pacific Northwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteria which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.

  9. Underground Pumped Hydroelectric Storage (UPHS). Program report, April 1-September 30, 1979. ANL Activity No. 49964

    Energy Technology Data Exchange (ETDEWEB)

    Blomquist, C.A.; Frigo, A.A.; Tam, S.W.; Clinch, J.M.

    1979-10-01

    The Argonne National Laboratory Underground Pumped Hydroelectric Storage activities for the second half of FY 1979 are described. Activities include program management and support, subcontract work, and systems studies. Information is given on the preliminary design, hydraulic performance, and cost of high-head, 350-MW capacity, single- and two-stage reversible, Francis-type pump turbines. Similar information is also presented on 350- and 500-MW capacity, multistage, unregulated, reversible, pump turbines. An assessment of the application potential of controlled-flow rate pumps and pump turbines is included. The effects of the charge/discharge ratio of a pumped stoage plant is also discussed.

  10. Impact on the aquatic environment of hydro-peaking in hydroelectric plants

    International Nuclear Information System (INIS)

    Sabaton, C.; Lauters, F.; Valentin, S.

    1996-01-01

    There are a number of types of hydroelectric installations on French rivers. Some of these intermittently turbine water stored in dammed reservoirs, in order to use available reserves at the most opportune moment for power generation. These plants, run under 'hydro-peaking' management procedures, cause variations in discharge in river sections downstream of the restitution, on a daily or weekly scale. To answer questions concerning the impact of such variations in discharge on the aquatic environment, EDF launched a research program aimed at describing and better understanding the physical and biological phenomena related to hydro-peaking and assessing the possible impact of this type of plant management on French streams. Seven sites subjects to hydro-peaking were studied on rivers with mean flow rates lower than 20 m 3 /s (which corresponds to over 65 % of EDF hydro-peaking sites). Four themes in particular were examined: hydraulic characterization of hydro-peaking, modifications in thermal regime and water quality, response of benthic invertebrates and response of fish populations to hydro-peaking. For fish as well as for invertebrates, the role of the base discharge - in the absence of peaking flow - and that of the morphology of the river bed (and, in particular, the presence of shelter for fish) during periods of strong discharge were clearly highlighted. Impact assessment requires a precise diagnosis of the state of biocenoses. To carry out such a diagnosis, one must reason in terms of species, life phase (particularly the most sensitive phases) and population structure as well as the type of stream and the faunizone involved. A risk assessment is possible by means of simultaneous study of the morphology of the river bed and the response of the signal generated by hydro-peaking in terms of hydrology and physical characteristics downstream of the restitution. (authors)

  11. The challenge of introducing high-temperature reactor plants onto the international power plant market

    International Nuclear Information System (INIS)

    Bogen, J.; Stoelzl, D.

    1987-01-01

    Growth of world population increases energy demand until the year 2000 and afterwards. Electricity growth rates in industrialized nations are lower after the oil price escalation in 1973 and 1979, and in developing countries grid sizes are often too small for the operation of large LWR plants. This indicates a potential for small and medium-sized power reactors such as the HTR-100 and the HTR-500. These plants can compete with coal fired plants of comparable size. An HTR-500 is even competitive, considering the electricity generating cost of large LWR plants. The special advantages of HTR plants in the small and medium-capacity range are discussed. (orig.)

  12. The challenge of introducing high-temperature-reactor plants onto the international power plant market

    International Nuclear Information System (INIS)

    Bogen, J.; Stoelzl, D.

    1988-01-01

    Growth of world population increases energy demand until the year 2000 and afterwards. Electricity growth rates in industrialized nations are lower after the oil price escalation in 1973 and 1979, and in developing countries grid sizes are often too small for the operation of large LWR plants. This indicates a potential for small and medium-sized power reactors such as the HTR-100 and the HTR-500. These plants can compete with coal fired plants of comparable size. An HTR-500 is even competitive, considering the electricity generating cost of large LWR plants. The special advantages of HTR plants in the small and medium-capacity range are discussed. (orig.)

  13. Benefits and applications of modular hydroelectric pumped storage

    International Nuclear Information System (INIS)

    Koebbe, R.S.

    1991-01-01

    This paper reports on hydroelectric pumped storage which is the only proven and most efficient technology available for energy storage. It is used by utilities to provide peak and intermediate power and to optimize overall system performance. Because of increased environmental and regulatory constraints, few acceptable sites, long schedules, and huge financial commitments, large conventional pumped storage plants, are now virtually impossible to build. As an alternative, small modular pumped storage, with project sizes ranging from 25 MW to 200 MW, was created to overcome the difficulties of conventional projects. The modular approach involves standardizing the elements of a pumped storage plant by utilizing specialized siting techniques and optimizing design, equipment, and construction. Compared with conventional pumped storage, the modular design can reduce cost and expedite schedule; reduce environmental concerns and permitting obstacles; and expand applications of energy storage on a utility's system

  14. Technological characterization of basaltic rocks of Canoas I Hydroelectric Power Plant, Paranapanema river, Sao Paulo - Parana states, Brazil; Caracterizacao tecnologica das rochas basalticas da Usina Hidroeletrica Canoas I, Rio Paranapanema, SP/PR

    Energy Technology Data Exchange (ETDEWEB)

    Marrano, Antonio

    1997-07-01

    Basaltic litotypes from the rock mass foundation of Canoas I Hydroelectric Power Plant were submitted to technological characterization tests, in order to verify their suitability as construction material. Physical and mechanical properties (density, porosity, water absorption, ultrasonic velocity, compressive and splitting tensile strength, among others) were determined, besides petrographic analyses. Weather ability tests were also performed, not only through wetting-drying cycles and by immersion in ethylene glycol but by outdoor exposure as well, using crushed and core drilled specimens. Detailed procedures for the weather ability test using core specimens from rotary drilling are given. It is analyzed the influence of a geological feature (fault zone, about 10 meters thick and 20 degrees dip), that occurs in the rock mass foundation, on the technological properties of these rocks. Basaltic litotypes selected as construction material are then pointed out. (author)

  15. An approach to the investment analysis of small and medium hydro-power plants

    DEFF Research Database (Denmark)

    Forouzbakhsh, Farshid; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Sincea large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments,however it is possible...

  16. Small and medium power reactors 1987

    International Nuclear Information System (INIS)

    1987-12-01

    This TECDOC follows the publication of TECDOC-347 Small and Medium Power Reactors Project Initiation Study - Phase I published in 1985 and TECDOC-376 Small and Medium Power Reactors 1985 published in 1986. It is mainly intended for decision makers in Developing Member States interested in embarking on a nuclear power programme. It consists of two parts: 1) Guidelines for the Introduction of Small and Medium Power Reactors in Developing Countries. These Guidelines were established during the Advisory Group Meeting held in Vienna from 11 to 15 May 1987. Their purpose is to review key aspects relating to the introduction of Small and Medium Power Reactors in developing countries; 2) Up-dated Information on SMPR Concepts Contributed by Supplier Industries. According to the recommendations of the Second Technical Committee Meeting on SMPRs held in Vienna in March 1985, this part contains the up-dated information formerly published in Annex I of the above mentioned TECDOC-347. Figs

  17. Small and medium power reactors 1987

    Science.gov (United States)

    1987-12-01

    This TECDOC follows the publication of TECDOC-347: Small and Medium Power Reactors (SMPR) Project Initiation Study, Phase 1, published in 1985 and TECDOC-376: Small and Medium Power Reactors 1985 published in 1986. It is mainly intended for decision makers in Developing Member States interested in embarking on a nuclear power program. It consists of two parts: (1) guidelines for the introduction of small and medium power reactors in developing countries. These Guidelines were established during the Advisory Group Meeting held in Vienna from 11 to 15 May 1987. Their purpose is to review key aspects relating to the introduction of small and medium power reactors in developing countries; (2) up-dated information on SMPR Concepts Contributed by Supplier Industries. According to the recommendations of the Second Technical Committee Meeting on SMPRs held in Vienna in March 1985, this part contains the up-dated information formerly published in Annex 1 of the above mentioned TECDOC-347.

  18. Medium-Power Lead-Alloy Fast Reactor Balance-of-Plant Options

    International Nuclear Information System (INIS)

    Dostal, Vaclav; Hejzlar, Pavel; Todreas, Neil E.; Buongiorno, Jacopo

    2004-01-01

    Proper selection of the power conversion cycle is a very important step in the design of a nuclear reactor. Due to the higher core outlet temperature (∼550 deg. C) compared to that of light water reactors (∼300 deg. C), a wide portfolio of power cycles is available for the lead alloy fast reactor (LFR). Comparison of the following cycles for the LFR was performed: superheated steam (direct and indirect), supercritical steam, helium Brayton, and supercritical CO 2 (S-CO 2 ) recompression. Heat transfer from primary to secondary coolant was first analyzed and then the steam generators or heat exchangers were designed. The direct generation of steam in the lead alloy coolant was also evaluated. The resulting temperatures of the secondary fluids are in the range of 530-545 deg. C, dictated by the fixed space available for the heat exchangers in the reactor vessel. For the direct steam generation situation, the temperature is 312 deg. C. Optimization of each power cycle was carried out, yielding net plant efficiency of around 40% for the superheated steam cycle while the supercritical steam and S-CO 2 cycles achieved net plant efficiency of 41%. The cycles were then compared based on their net plant efficiency and potential for low capital cost. The superheated steam cycle is a very good candidate cycle given its reasonably high net plant efficiency and ease of implementation based on the extensive knowledge and operating experience with this cycle. Although the supercritical steam cycle net plant efficiency is slightly better than that of the superheated steam cycle, its high complexity and high pressure result in higher capital cost, negatively affecting plant economics. The helium Brayton cycle achieves low net plant efficiency due to the low lead alloy core outlet temperature, and therefore, even though it is a simpler cycle than the steam cycles, its performance is mediocre in this application. The prime candidate, however, appears to be the S-CO 2

  19. Nuclear power plants

    International Nuclear Information System (INIS)

    Kiyokawa, Teruyuki; Soman, Yoshindo.

    1985-01-01

    Purpose: To constitute a heat exchanger as one unit by integrating primary and secondary coolant circuits with secondary coolant circuit and steam circuit into a single primary circuit and steam circuit. Constitution: A nuclear power plant comprises a nuclear reactor vessel, primary coolant pipeways and a leakage detection system, in which a dual-pipe type heat exchanger is connected to the primary circuit pipeway. The heat conduction tube of the heat exchanger has a dual pipe structure, in which the inside of the inner tube is connected to the primary circuit pipeway, the outside of the outer tube is connected to steam circuit pipeway and a fluid channel is disposed between the inner and outer tubes and the fluid channel is connected to the inside of an expansion tank for intermediate heat medium. The leak detection system is disposed to the intermediate heat medium expansion tank. Sodium as the intermediate heat medium is introduced from the intermediate portion (between the inner and outer tubes) by way of inermediate heat medium pipeways to the intermediate heat medium expansion tank and, further, to the intermediate portion for recycling. (Kawakami, Y.)

  20. Evaluation of power plants in Turkey using Analytic Network Process (ANP)

    International Nuclear Information System (INIS)

    Atmaca, Ediz; Basar, Hasan Burak

    2012-01-01

    Energy is one of the most important parameters of the development of societies. Low cost, clean and secure energy supply is a common issue for all countries. Every country spends commercial and political effort to avoid not having sufficient energy and to ensure an uninterrupted energy supply. This study attempts to determine the suitability of existing power plants in Turkey and the plants that are being considered for establishment in the near future. The alternatives which are being considered are natural gas, wind, geothermal, hydroelectric, and coal/lignite energy plants as well as nuclear energy plants. By using the multi-criteria decision making technique of Analytic Network Process (ANP), a multi-criteria evaluations of six different energy plants were performed with respect to the major criteria such as technology and sustainability, economical suitability, life quality and socio-economic impacts. -- Highlights: ► The study attempted to lay out the criteria based on which power plant investments are evaluated. ► In the energy industry in Turkey and in the world, it is considerably difficult to access data on energy. ► This study will provide significant support for people working in the energy area and related decision makers in Turkey. ► The study is also thought to provide benefit decision makers in the world energy industry. ► It can provide great benefit in ensuring the security of the energy to be produced from power plant investments.

  1. Monitoring marginal erosion in hydroelectric reservoirs with terrestrial mobile laser scanner

    Directory of Open Access Journals (Sweden)

    A. M. G. Tommaselli

    2014-06-01

    Full Text Available Marginal erosions in reservoirs of hydroelectric plants have caused economic and environmental problems concerning hydroelectric power generation, reduction of productive areas and devaluing land parcels. The real extension and dynamics of these erosion processes are not well known for Brazilian reservoirs. To objectively assess these problems Unesp (Univ Estadual Paulista and Duke Energy are developing a joint project which aims at the monitoring the progression of some erosive processes and understanding the causes and the dynamics of this phenomenon. Mobile LASER scanning was considered the most suitable alternative for the challenges established in the project requirements. A MDL DynaScan Mobile LASER M150 scanner was selected which uses RTK for real time positioning integrated to an IMU, enabling instantaneous generation of georeferenced point clouds. Two different reservoirs were choose for monitoring: Chavantes (storage plant and Rosana (run-of-river plant, both in the Paranapanema River, border of São Paulo and Paraná States, Brazil. The monitoring areas are scanned quarterly and analysed with base on the point cloud, meshes, contours and cross sections. Cross sections are used to visualize and compute the rate and the dynamics of erosion. Some examples and quantitative results are presented along with an analysis of the proposed technique. Some recommendations to improve the field work and latter data processing are also introduced.

  2. Integrity and life estimation of turbine runner cover in a hydro power plant

    Directory of Open Access Journals (Sweden)

    A. Sedmak

    2016-03-01

    Full Text Available This paper presents integrity and life estimation of turbine runner cover in a vertical pipe turbines, Kaplan 200 MW nominal output power, produced in Russia, and built in six hydro-generation units of hydroelectric power plant „Đerdap 1” in Serbia. Fatigue and corrosion-fatigue interaction have been taken into account using experimentally obtained material properties, as well as analytical and numerical calculations of stress state, to estimate appropriate safety factors. Fatigue crack growth rate, da/dN, was also calculated, indicated that internal defects of circular or elliptical shape, found out by ultrasonic testing, do not affect reliable operation of runner cover.

  3. The Hydroelectric Business Unit of Ontario Power Generation Inc

    International Nuclear Information System (INIS)

    Gaboury, J.

    2001-01-01

    The focus of this presentation was on the generation and sale of electricity. Prior to deregulation, companies that generated electricity had a readily available customer base to whom the electricity could be sold. The author discussed some of the changes affecting the industry as a result of deregulation of the electricity market in Ontario: the increasing number of companies, as well as the increased number of generators supplying power within the province. Currently 85 per cent of the generation in Ontario is met by Ontario Power Generation (OPG) and this percentage will decrease through de-control. De-control can be achieved in a variety of ways, either through the sale of assets, leases, asset swaps. The market rules dictate that OPG not control in excess of 35 per cent of the generation supply in Ontario, OPG is examining the situation. New supply being constructed or new interconnections with neighboring markets could affect the total assets that would have to be de-controlled. OPG has a mix of generation that includes hydroelectric, fossil, and nuclear, as well as a single wind turbine. Green power, defined as electricity generation deemed less intrusive environmentally than most traditional generation, includes wind, water, landfill gas, solar and others, and could affect the mix of generation. It is expected that there will be a niche market for green power, especially when one considers the reduction in emissions. It could represent a viable option for smaller startup companies, as less capital is required. The options for selling the power, either to the spot market or by entering into a bilateral contract with another customer, were explained

  4. Hydroelectric development project of the Magpie dam on the Magpie River: Investigation and public hearing report

    International Nuclear Information System (INIS)

    Harvey, A.; Journault, C.

    2004-08-01

    Public hearings were held by Quebec's Bureau d'audiences publiques sur l'environnement (BAPE) concerning a proposed hydroelectric development project on the Magpie River in Quebec's Minganie Region. The proposed hydroelectric power plant is to be developed and managed by Hydromega Services Inc. and constructed by Aecon Group Ltd. The project consists of reconstructing a power plant and dam at an existing site that was constructed in 1961 but which has been decommissioned since 1989. The installed capacity of the proposed power plant is 40.6 MW. The drop height for the dam is 21.25 metres. The issues that were addressed during the hearings included the opinions and suggestion of the participants regarding energy provisions, regional development and ecological protection. One of the main concerns facing this project is the loss of spectacular rapids currently used by rafters. The Commission noted that the rapids cannot be saved without significant modification to the design of the project. However, the flooding associated with the project would facilitate fishermen, canoeists and kayakers, thereby preserving the recreational and tourism attributes of the Magpie River. The Commission also noted that the local economic repercussions of the project would benefit the population of the Minganie Region which has a high unemployment rate. Any ecological impacts may be controlled by relevant attenuation measures and follow-up. It was concluded that the proposed project could contribute modestly to meeting the anticipated growth in energy demand in Quebec. refs., figs

  5. Cross currents : hydroelectricity and the engineering of northern Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Manore, J.L. [Calgary Univ., AB (Canada)

    1999-05-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations` peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario`s north and south. refs., figs.

  6. Cross currents : hydroelectricity and the engineering of northern Ontario

    International Nuclear Information System (INIS)

    Manore, J.L.

    1999-01-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations' peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario's north and south. refs., figs

  7. The economics of coal and nuclear power plants

    International Nuclear Information System (INIS)

    Prior, M.J.

    1978-01-01

    This paper is largely based on a comparison of electrical generating costs from coal-fired power plants and thermal nuclear reactors. Following an introductory section, the subject is considered under the following headings: methodology; cost basis (capital costs, fuel costs, plant factors); generating costs; the fast breeder reactor -general issues; the economics of fast breeder reactors; conclusions and questions. (U.K.)

  8. Ecologically justified regulatory provisions for riverine hydroelectric power plants and minimum instream flow requirements in diverted streams; Oekologisch begruendete, dynamische Mindestwasserregelungen bei Ausleitungskraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Jorde, K.

    1997-12-31

    The study was intended to develop a model versatile enough to permit quantification of various water demand scenarios in connection with operation of riverine hydroelectric power plants. Specific emphasis was to be placed on defining the minimum instream flow to be maintained in river segments because of the elementary significance to flowing water biocinoses. Based on fictitious minimum water requirements, various scenarious were simulated for flow regimes depending on power plant operation, so as to establish a system for comparative analysis and evaluation of resulting economic effects on power plant efficiency on the one hand, and the ecologic effects on the aquatic habitat. The information derived was to serve as a basis for decision-making for regulatory purposes. For this study, the temporal and spatial variability of the flow regime at the river bed in a river segment was examined for the first time. Based on this information, complemented by information obtained from habitat simulations, a method was derived for determination of ecologic requirements and their incorporation into regulatory water management provisions. The field measurements were carried out with the FST hemisphere as a proven and most efficient and reliable method of assessing flow regimes at river beds. Evaluation of the measured instream flow data characterising three morphologically different segments of diverted rivers was done with the CASIMIR computer code. The ASS models derived were used for comparative assessment of existing regulatory provisions and recommended amendments determining required minimum instream flow in diverted rivers. The requirements were defined taking as a basis data obtained for three different years. (orig./CB) [Deutsch] Ziel der Arbeit war die Entwicklung eines Modellverfahrens, das flexibel die Quantifizierung unterschiedlicher Nutzansprueche an Laufwasserkraftanlagen ermoeglicht. Insbesondere der Erhalt einer gewissen Dynamik, die fuer

  9. Ecologically justified regulatory provisions for riverine hydroelectric power plants and minimum instream flow requirements in diverted streams; Oekologisch begruendete, dynamische Mindestwasserregelungen bei Ausleitungskraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Jorde, K

    1998-12-31

    The study was intended to develop a model versatile enough to permit quantification of various water demand scenarios in connection with operation of riverine hydroelectric power plants. Specific emphasis was to be placed on defining the minimum instream flow to be maintained in river segments because of the elementary significance to flowing water biocinoses. Based on fictitious minimum water requirements, various scenarious were simulated for flow regimes depending on power plant operation, so as to establish a system for comparative analysis and evaluation of resulting economic effects on power plant efficiency on the one hand, and the ecologic effects on the aquatic habitat. The information derived was to serve as a basis for decision-making for regulatory purposes. For this study, the temporal and spatial variability of the flow regime at the river bed in a river segment was examined for the first time. Based on this information, complemented by information obtained from habitat simulations, a method was derived for determination of ecologic requirements and their incorporation into regulatory water management provisions. The field measurements were carried out with the FST hemisphere as a proven and most efficient and reliable method of assessing flow regimes at river beds. Evaluation of the measured instream flow data characterising three morphologically different segments of diverted rivers was done with the CASIMIR computer code. The ASS models derived were used for comparative assessment of existing regulatory provisions and recommended amendments determining required minimum instream flow in diverted rivers. The requirements were defined taking as a basis data obtained for three different years. (orig./CB) [Deutsch] Ziel der Arbeit war die Entwicklung eines Modellverfahrens, das flexibel die Quantifizierung unterschiedlicher Nutzansprueche an Laufwasserkraftanlagen ermoeglicht. Insbesondere der Erhalt einer gewissen Dynamik, die fuer

  10. Mobile medium-voltage switching system. Temporary standby power supply in record time; Mobile Mittelspannungsschaltanlage. Vorlaeufige Wiederversorgung in Rekordzeit

    Energy Technology Data Exchange (ETDEWEB)

    Thiery, Matthias; Schwarz, Stefan [Siemens AG, Mannheim (Germany); Wingerter, Dieter [BASF SE, Ludwigshafen (Germany); Doering, Holger [B. Goebel und Sohn GmbH, Asschaffenburg (Germany). Fahrzeugbau

    2011-02-28

    BASF SE Ludwigshafen operates more than 100 medium-voltage switching stations for power supply to its plants. The complexity of the production plants and production method make it necessary to have immediate standby power supply in case of interruption of a medium-voltage switching station. For this purpose, a transportable emergency container was acquired that contains a medium-voltage switching system. Power can be supplied at very short notice, simply by plugging the necessary cable connections. No cranes or other tools are required for installation. The emergency container is designed for use at varying voltage levels and can be transported by road to other BASF sites in Europe. The switching station is a gas-insulated medium-voltage switching station 8DA10 by Siemens, designed for operating voltages of 6, 10, 20, and 35 kW.

  11. Optimal control of hydroelectric facilities

    Science.gov (United States)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  12. [The mosquito fauna (Diptera: Culicidae) of the environs of the Sayan-Shushenskoe hydroelectric power station].

    Science.gov (United States)

    Gornostaeva, R M

    1999-01-01

    Among females and larvae of mosquitoes collected in 1969, 1981-1984 in the area of the Sayan-Shushenskoe hydroelectric power station (140 km up the Yenisei River from the Abakan city) 5 genera and 30 species were recorded. Based on recent collections and reference data (Gornostaeva e. a., 1969; Gornostaeva, Danilov, 1986) the fauna of the region in question includes 31 species of mosquitoes (Anopheles--1, Culiseta--2, Coquillettidia--1, Aedes--22, Culex--5).

  13. Economical aspects of a nuclear power plant project

    International Nuclear Information System (INIS)

    Meldonian, N.L.; Santos, E.M. dos

    1992-01-01

    This work describes different aspects and parameters that should be regarded as guidelines for economic evaluation of small and medium power plant projects. The main objective of an economic evaluation is to establish the plant's unitary cost and its economic figure of merit. To achieve that, a number of studies must be undertaken to compare the global competitiveness of a nuclear power plant with other energetic alternatives. These studies involve macro economy, energy generation, electricity transmission and global feasibility of the enterprise. It is concluded that the economic evaluation of a nuclear power plant should be considered as the culmination of a long process of planning at a national level. The main reasons are the investments involved, the technological developments required and political implications of the utilization of nuclear power energy. (author)

  14. Nuclear Power Plants and Sustainable Development on a Liberalized Market

    International Nuclear Information System (INIS)

    Androcec, I.; Stanic, Z.; Tomsic, Z.

    2002-01-01

    Finding a way to generate electricity so as to satisfy the terms of sustainable development of the entire society is the only way which will secure safe energy future. If we talk about energy in the context of sustainable development, one of the most important element is environmental protection. Since CO 2 emissions stemming from electricity generation have predominant impact on climate change, one of the options for reducing emissions is the use of fuels without carbon, such as e.g. nuclear fuel. The future of nuclear power plants was considered in view of: nuclear fuel supply; potential impact of fuel cycle on environment, power plant operation, decommissioning and secondary products from electricity generation; and the entire nuclear power plant economy. Nuclear power plants were also examined in the context of the Kyoto Protocol stipulating reduction of greenhouse gases emissions. Nuclear power plants can not reduce CO 2 emissions in a short-term because they already operate with maximum output, but in a long-run they can play a significant role. This paper is aiming to analyse the role of nuclear power plants in long term environmental sustainability in electricity sector reform (liberalisation, deregulation, privatisation) in small or medium sized power supply systems. Nuclear power plants are associated with certain environmental aspects which will be taken into account. A comparison will be made through externalities with other energy resources, especially fossil fuels, which are prevailing energy resources, considering possible use of nuclear power plants in the countries with small and medium-size grids. It will be given an example of the role of NPP Krsko on air emissions reduction in Croatia. (author)

  15. Fiscal 1981 Sunshine Project research report. Development of hydrothermal power plant. Development of binary cycle power plant (Research on heat cycle and heat medium, materials, and heat medium turbine); 1981 nendo nessui riyo hatsuden plant no kaihatsu seika hokokusho. Binary cycle hatsuden plant no kaihatsu (netsu cycle oyobi netsubaitai no kenkyu, zairyo no kenkyu narasbini netsubaitai turbine no kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    This report summarizes the final fiscal 1981 research result on components of the next 10MW class geothermal binary cycle power plant. In the research on heat cycle and heat medium, R-C318 and R-124 were excellent in output characteristics in a low-temperature zone and high-temperature zone in a hot water temperature range of 120-160 degreesC, respectively, however, at present R-114 was most reasonable from the viewpoint of heat medium price and supply system. In the research on martials, study was made on inlet-attack and stress corrosion of heat exchanger pipes of 18Cr-13Ni-2Mo steel, and combination use of inexpensive materials (carbon steel). As used giving attention to stress corrosion, at present 18Cr-13Ni-2Mo steel was most suitable material, while clad carbon steel was also usable. In the research on heat medium turbine, the 1000-hour durability test result of mechanical seal showed that mechanical seal is best for heat medium turbines. (NEDO)

  16. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  17. Electric power monthly, September 1990. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-17

    The purpose of this report is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues. The power plants considered include coal, petroleum, natural gas, hydroelectric, and nuclear power plants. Data are presented for power generation, fuel consumption, fuel receipts and cost, sales of electricity, and unusual occurrences at power plants. Data are compared at the national, Census division, and state levels. 4 figs., 52 tabs. (CK)

  18. [Space-time water monitoring system at the Iriklinsk hydroelectric power station].

    Science.gov (United States)

    Deriabin, D G; Poliakov, E G; Priakhina, A A; Karimov, I F

    2002-01-01

    The Microbiosensor B 17677 F test system was applied to make a space-time monitoring of the biotoxicity of water used for production and everyday purposes at the Iriklinsk hydroelectric power station (IHEPS) and to identify the leading causes determining the biotoxicity of tested samples. There were seasonal variations in the biotoxicity with the maximum in spring and with minimum in winter and spring and a relationship of the spring rise in the biotoxicity to water pH changes. There was also an association of the certain values of the biotoxicity of industrial water with the concentration of petroleum products that are major pollutants at the IHEPS. The datum points that characterize the maximum level of technogenic exposure were identified.

  19. New social movements and political process: The politics of hydroelectric power in Switzerland

    Science.gov (United States)

    Lehmann, Luzia M.

    This dissertation analyzes the mobilization and impact of the ecology movement mobilizing against and challenging hydroelectric power plants in the Alps. It argues that the political process model is the most fruitful framework for such a study, linking a political system's structural constraints and opportunities to movement action via organizational resources. The mobilization process resulting in movement impact is conceived as an interactive process among social movements, authorities, other opponents, and potential counter movements. The case study method is then used to analyze three action campaigns launched against hydro power plants in Graubunden since the 1970s: Ilanz I and II, Greina, and Curciusa. In terms of the movement's narrow goal of preventing a plant, Ilanz I and II is a failure, Greina a success, and Curciusa ambiguous. Yet the author defines movement impact more broadly, including procedural, reactive and proactive substantive impact, and structural impact, changes in the alliance/conflict system, and social learning. Based on the evidence from the case studies, these factors affect movement outcome positively: visibility in the media and framing the debate, adjusting the target level and movement repertoire to the opportunity structure and the spatial concentration of the issue, proactivity, and organizational resources with a well developed division of labor, internal communication, and a non-partisan alliance system at all levels. There are two main conceptual contributions. First, the author analyzes the political opportunity structure at all levels of the federal polity--the national, cantonal, and communal--as well as the interplay among the levels. The fact that the cantonal and communal levels exhibit more elements of closure than the national level helps explain differences in movements' organizational resources, movement repertoire, targeting of movement action, and thus movement impact. Second, the author develops the spatial

  20. Global analysis of a renewable micro hydro power generation plant

    Science.gov (United States)

    Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul

    2017-12-01

    Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.

  1. Design methods for high temperature power plant structures

    International Nuclear Information System (INIS)

    Townley, C.H.A.

    1984-01-01

    The subject is discussed under the headings: introduction (scope of paper - reviews of design methods and design criteria currently in use for both nuclear and fossil fuelled power plant; examples chosen are (a) BS 1113, representative of design codes employed for power station boiler plant; (b) ASME Code Case N47, which is being developed for high temperature nuclear reactors, especially the liquid metal fast breeder reactor); design codes for power station boilers; Code Case N47 (design in the absence of thermal shock and thermal fatigue; design against cyclic loading at high temperature; further research in support of high temperature design methods and criteria for LMFBRs); concluding remarks. (U.K.)

  2. Nuclear power and other energy

    International Nuclear Information System (INIS)

    Doederlein, J.M.

    1975-01-01

    A comparison is made between nuclear power plants, gas-fuelled thermal power plants and oil-fired thermal power plants with respect to health factors, economy, environment and resource exploitation, with special reference to the choice of power source to supplement Norwegian hydroelectric power. Resource considerations point clearly to nuclear power, but, while nuclear power has an overall economic advantage, the present economic situation makes its heavy capital investment a disadvantage. It is maintained that nuclear power represents a smaller environmental threat than oil or gas power. Finally, statistics are given showing that nuclear power involves smaller fatality risks for the population than many other hazards accepted without question. (JIW)

  3. 1984 availability of the world's nuclear power plants

    International Nuclear Information System (INIS)

    Szeless, A.; Oszuszky, F.

    1985-01-01

    This survey of the availability of the world's nuclear power plants in 1984 coveres 250 units (the CMEA countries excluded) with an aggregate 184,500 MWe, which are arranged by types of reactor and geographic distribution. The utilization of nuclear power plant capacity attained an average of 66% in 1984, which is an increase by 3 percentage points in the utilization of capacity over the previous year's level (63%). Capacity utilization in pressurized water reactors 1984 (69%) was 4 percentage points higher than it was in boiling water reactors (65%). The ranking list of the world's nuclear power plants is headed by one heavy water reactor and one gas cooled reactor each (98%), followed by five generating units, i.e., two pressurized water reactors, two boiling water reactors, and one heavy water reactor (all 95%). The best German nuclear power plants were Grafenrheinfeld (89%, position No. 20) and Unterweser and Stade (88%, position No. 25). (orig.) [de

  4. Report on technical feasibility of underground pumped hydroelectric storage in a marble quarry site in the Northeast United States

    Energy Technology Data Exchange (ETDEWEB)

    Chas. T. Main, Inc.

    1982-03-01

    The technical and economic aspects of constructing a very high head underground hydroelectric pumped storage were examined at a prefeasibility level. Excavation of existing caverns in the West Rutland Vermont marble quarry would be used to construct the underground space. A plant capacity of 1200 MW and 12 h of continuous capacity were chosen as plant operating conditions. The site geology, plant design, and electrical and mechanical equipment required were considered. The study concluded that the cost of the 1200 MW underground pumped storage hydro electric project at this site even with the proposed savings from marketable material amounts to between $581 and $595 per kilowatt of installed capacity on a January 1982 pricing level. System studies performed by the planning group of the New England Power System indicate that the system could economically justify up to about $442 per kilowatt on an energy basis with no credit for capacity. To accommodate the plant with the least expensive pumping energy, a coal and nuclear generation mix of approximately 65% would have to be available before the project becomes feasible. It is not expected that this condition can be met before the year 2000 or beyond. It is therefore concluded that the West Rutland underground pumped storage facility is uneconomic at this time. Several variables however could have marked influence on future planning and should be examined on periodic basis.

  5. Environmental Cost of Electric Power, A Scientists' Institute for Public Information Workbook.

    Science.gov (United States)

    Abrahamson, Dean E.

    Analyzed are the environmental and health hazards associated with different forms of power production: nuclear power plants, fossil fuel plants, and hydroelectric plants. Data are given relating to chemical pollution, thermal pollution, radioactive hazards and geological and geographical effects. Problems of setting standards, and criteria which…

  6. Hydroelectric power and global environmental problems: benefits and environmental impacts

    International Nuclear Information System (INIS)

    Chabot, B.

    1992-01-01

    The risk of global warming is one of the most serious global environmental problems. It is due to the increase of greenhouse gases emissions, mainly because of the use of fossil fuels in the energy sector, particularly for electricity generation. At an international level, experts now agree that measures are to be taken to reduce this risk. In the energy sector, an improvement of energy efficiency and an increase of nuclear electricity generation are often presented as the best available solutions. Renewable energy sources are often presented as a solution with a negligible potential impact, and sometimes, hydro power is even forgotten, or its coasts and its potential impacts on local environment are presented as an obstacle to its positive contribution to the reduction of global warming risk. Without denying the positive impacts of other solutions, this paper explains the possibilities and the benefits of an increased use of hydroelectric power, when implemented with a minimum impact on local environment and with a synergistic effect with the rational use of generated energy, in order to have access to a sustainable development. 19 refs., 6 figs

  7. Evaluation of the Life Cycle Greenhouse Gas Emissions from Hydroelectricity Generation Systems

    Directory of Open Access Journals (Sweden)

    Akhil Kadiyala

    2016-06-01

    Full Text Available This study evaluated the life cycle greenhouse gas (GHG emissions from different hydroelectricity generation systems by first performing a comprehensive review of the hydroelectricity generation system life cycle assessment (LCA studies and then subsequent computation of statistical metrics to quantify the life cycle GHG emissions (expressed in grams of carbon dioxide equivalent per kilowatt hour, gCO2e/kWh. A categorization index (with unique category codes, formatted as “facility type-electric power generation capacity” was developed and used in this study to evaluate the life cycle GHG emissions from the reviewed hydroelectricity generation systems. The unique category codes were labeled by integrating the names of the two hydro power sub-classifications, i.e., the facility type (impoundment (I, diversion (D, pumped storage (PS, miscellaneous hydropower works (MHPW and the electric power generation capacity (micro (µ, small (S, large (L. The characterized hydroelectricity generation systems were statistically evaluated to determine the reduction in corresponding life cycle GHG emissions. A total of eight unique categorization codes (I-S, I-L, D-µ, D-S, D-L, PS-L, MHPW-µ, MHPW-S were designated to the 19 hydroelectricity generation LCA studies (representing 178 hydropower cases using the proposed categorization index. The mean life cycle GHG emissions resulting from the use of I-S (N = 24, I-L (N = 8, D-µ (N = 3, D-S (N = 133, D-L (N = 3, PS-L (N = 3, MHPW-µ (N = 3, and MHPW-S (N = 1 hydroelectricity generation systems are 21.05 gCO2e/kWh, 40.63 gCO2e/kWh, 47.82 gCO2e/kWh, 27.18 gCO2e/kWh, 3.45 gCO2e/kWh, 256.63 gCO2e/kWh, 19.73 gCO2e/kWh, and 2.78 gCO2e/kWh, respectively. D-L hydroelectricity generation systems produced the minimum life cycle GHGs (considering the hydroelectricity generation system categories with a representation of at least two cases.

  8. The evolving policy regime for pumped storage hydroelectricity in China: A key support for low-carbon energy

    International Nuclear Information System (INIS)

    Zhang, Sufang; Andrews-Speed, Philip; Perera, Pradeep

    2015-01-01

    Highlights: • Highlights the role of pumped storage hydroelectricity in renewable energy integration. • Examines the development of pumped storage hydroelectricity in China. • Reviews the regulatory policies on pumped storage hydroelectricity in China. • Analyzes the operation and pricing regime for pumped storage hydroelectricity in China. • Makes policy recommendations for promoting pumped storage hydroelectricity in China. - Abstract: As part of its energy transition strategy, China has set ambitious targets for increasing the contribution of renewable energy and, in particular, of wind power. However, the Chinese power sector has not undergone the necessary reforms to facilitate the integration and absorption of a larger share of variable renewable energy. This is evident from the difficulties in absorbing wind power from already commissioned wind farms and the resultant curtailment of wind power. Pumped storage hydroelectricity (PSH) is a flexible power source that can facilitate higher penetration levels of wind power as well as complement China’s growing nuclear power capacity. However, regulatory policy constraints have restricted the effective utilization of existing PSH capacity and discouraged investment in new PSH capacity. This paper examines these constraints and assesses the likely impact of new policies designed to address them. Finally, policy recommendations and concluding remarks are provided. This paper contributes to the literature on renewable energy integration from a new perspective. The lessons from China are relevant to other countries going through the energy transition

  9. A new methodology for royalties distribution of the Itaipu hydroelectric plant: The hydrographic basin as the unit of analysis.

    Science.gov (United States)

    Lorenzon, Alexandre Simões; Ribeiro, Carlos Antonio Alvares Soares; Dos Santos, Alexandre Rosa; de Castro, Nero Lemos Martins; Marcatti, Gustavo Eduardo; Domingues, Getulio Fonseca; Teixeira, Thaisa Ribeiro; Silva, Elias; Soares, Vicente Paulo; Menezes, Sady Júnior Martins da Costa de; de Almeida Telles, Lucas Arthur; Mota, Pedro Henrique Santos

    2018-07-01

    Over the past few years, many sectors such as energy generation, industry, domestic supply, and agriculture have encountered serious environmental problems due to the lack of rainfall. Thus, the purpose of this paper is to review the current methodology of royalties distribution from Itaipu hydroelectric plant. In the proposed approach, two criteria were considered to establish the division of Itaipu royalties: (1) the relative percentage of the water flow in the generation of electricity and, (2) the relative percentage of the drop in the height of water. 62 hydroelectric plants were evaluated in this study. In 52 plants the water flow was the factor that most contributed to the generation of electricity. In 2013, 346 municipalities benefited the Itaipu royalties. With the proposed methodology, 1,327 municipalities will receive the resource, what would increase the revenue of each of these municipalities by, on average, US$ 87,436.91 per year. The methodology presented herein proposes a reduction in the environmental disparity that now exists in Brazil, through improvement to Government instruments and environmental policies. The distribution of royalties throughout the watershed can provide additional resources to support payment programs for environmental services at the state and municipality levels. Copyright © 2018 Elsevier Ltd. All rights reserved.

  10. The hydroelectric power plant as a project of private investment; La central hidroelectrica como proyecto de inversion privada

    Energy Technology Data Exchange (ETDEWEB)

    Guerra, Eduardo [Industrias Metalurgicas Pescarmona S.A. (IMPSA), Mendoza (Argentina)]. E-mail: guerra@impsa.com.ar

    2001-07-01

    The paper describes the process to be followed for the performance, construction and operation of a hydroelectric investment from the view point of a private investor. The paper demonstrates that it is possible to finance the project through the 'project finance', where the finance has as guarantee the own assets and the fund fluxes of the investment.

  11. Mines as lower reservoir of an UPSH (Underground Pumping Storage Hydroelectricity): groundwater impacts and feasibility

    Science.gov (United States)

    Bodeux, Sarah; Pujades, Estanislao; Orban, Philippe; Dassargues, Alain

    2016-04-01

    The energy framework is currently characterized by an expanding use of renewable sources. However, their intermittence could not afford a stable production according to the energy demand. Pumped Storage Hydroelectricity (PSH) is an efficient possibility to store and release electricity according to the demand needs. Because of the topographic and environmental constraints of classical PSH, new potential suitable sites are rare in countries whose topography is weak or with a high population density. Nevertheless, an innovative alternative is to construct Underground Pumped Storage Hydroelectricity (UPSH) plants by using old underground mine works as lower reservoir. In that configuration, large amount of pumped or injected water in the underground cavities would impact the groundwater system. A representative UPSH facility is used to numerically determine the interactions with surrounding aquifers Different scenarios with varying parameters (hydrogeological and lower reservoir characteristics, boundaries conditions and pumping/injection time-sequence) are computed. Analysis of the computed piezometric heads around the reservoir allows assessing the magnitude of aquifer response and the required time to achieve a mean pseudo-steady state under cyclic solicitations. The efficiency of the plant is also evaluated taking the leakage into the cavity into account. Combining these two outcomes, some criterions are identified to assess the feasibility of this type of projects within potential old mine sites from a hydrogeological point of view.

  12. Tangible interfaces for virtual nuclear power plant control desk

    Energy Technology Data Exchange (ETDEWEB)

    Aghina, Mauricio Alves C.; Mol, Antonio Carlos A.; Jorge, Carlos Alexandre F.; Lapa, Celso M.F. [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil); Nomiya, Diogo [Engenharia Eletrica (UFRJ), Universidade Federal do Rio de Janeiro, RJ (Brazil); Cunha, Gerson G.; Landau, Luiz [Programa de Engenharia Civil (PEC/COPPE/UFRJ), Universidade Federal do Rio de Janeiro, RJ (Brazil)

    2011-07-01

    Due to the high safety requirements for nuclear power plant operation, control desks must be designed in such a way operators can take all the procedures safely, with a good overview of all variable indicators and easy access to actuator controls. Also, operators must see alarms indication in a way they can easily identify any abnormal conditions and bring the NPP back to normal operation. The ergonomics and human factors fields have helped evaluations to improve the design of nuclear power plant control systems. Lately, the use of virtual control desks have helped even more such evaluations, by integrating in one platform both nuclear power plant dynamics simulator with a high visual fidelity control desk proto typing. Operators can interact with these virtual control desks in a similar way as with real ones. Such a virtual control desk has been under development at Instituto de Engenharia Nuclear, IEN/CNEN. This paper reports the latest improvements, with the use of more interaction modes, to turn operation a friendlier task. An automatic speech recognition interface has been implemented as a self-contained system, by accessing directly MS Windows Application Interface, and with online neural network training for spoken commend recognition. Thus, operators can switch among different desk views. Besides this, head tracking interfaces have been integrated with the virtual control desk, to move within desk views according to users head movements. Both marker and markerless-based head tracking interfaces have been implemented. Results are shown and commented. (author)

  13. Tangible interfaces for virtual nuclear power plant control desk

    International Nuclear Information System (INIS)

    Aghina, Mauricio Alves C.; Mol, Antonio Carlos A.; Jorge, Carlos Alexandre F.; Lapa, Celso M.F.; Nomiya, Diogo; Cunha, Gerson G.; Landau, Luiz

    2011-01-01

    Due to the high safety requirements for nuclear power plant operation, control desks must be designed in such a way operators can take all the procedures safely, with a good overview of all variable indicators and easy access to actuator controls. Also, operators must see alarms indication in a way they can easily identify any abnormal conditions and bring the NPP back to normal operation. The ergonomics and human factors fields have helped evaluations to improve the design of nuclear power plant control systems. Lately, the use of virtual control desks have helped even more such evaluations, by integrating in one platform both nuclear power plant dynamics simulator with a high visual fidelity control desk proto typing. Operators can interact with these virtual control desks in a similar way as with real ones. Such a virtual control desk has been under development at Instituto de Engenharia Nuclear, IEN/CNEN. This paper reports the latest improvements, with the use of more interaction modes, to turn operation a friendlier task. An automatic speech recognition interface has been implemented as a self-contained system, by accessing directly MS Windows Application Interface, and with online neural network training for spoken commend recognition. Thus, operators can switch among different desk views. Besides this, head tracking interfaces have been integrated with the virtual control desk, to move within desk views according to users head movements. Both marker and markerless-based head tracking interfaces have been implemented. Results are shown and commented. (author)

  14. The Feasibility of Small Hydro-Electric Generation in a Large Urban Area

    OpenAIRE

    Benson Y. Zhang; Adam Taylor

    2012-01-01

    The possibilities of generating electric power from relatively small hydro-electric sources in a large urban area is investigated. Two different aspects of hydro-electric sources have been studied: storm/waste water pipes in large multi-tenanted residential buildings and urban storm water discharge area (CSI area). The potential to generate from these sources has been investigated using a micro-turbine. The potential electric power which could be extracted from the sources was estimated using...

  15. Proceedings on the seminar on small hydroelectric installations: Practice report and current development; Beitraege zum Seminar Kleinwasserkraft: Praxis und aktuelle Entwicklung

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This seminar on small hydroelectric installations informs on aspects of construction and administrative aspects. But above all, questions of machinery are dealt with. The book gives an overview of turbine types, topical recent developments in the sector of small hydroelectric power stations, and modern opportunities for fast and inexpensive design of power station components. Beyond the discussion of technical issues, the seminar wants to further contacts between science, turbine manufacturers, consultants and plant operators. (orig.) [Deutsch] Das Seminar Kleinwasserkraft gibt eine Uebersicht ueber bauliche Gestaltung und behoerdliche Aspekte. Vorallem behandelt es aber maschinenbauliche Problemstellungen. Es zeigt einen Ueberblick ueber Turbinentypen, aktuelle Neuentwicklungen im Kleinwassersektor, sowie moderne Moeglichkeiten zum schnellen und preiswerten Design von Kraftwerkskomponenten. Neben dem technischen Teil dient das Seminar auch der Foerderung des Kontakts zwischen Wissenschaft, Turbinenherstellern, Consultants und Anlagenbetreibern. (orig.)

  16. Low head hydro market assessment : main report : vol. 1

    International Nuclear Information System (INIS)

    2008-03-01

    Hydroelectric power is a predictable renewable energy source that produces no greenhouse gases (GHGs) and has low maintenance costs. In addition to river resources, low head hydro is available in sluice gates, irrigation canals, drinking water pressure release valves, and municipal wastewater outfalls. Canada's potential for low head hydro has been estimated at 5000 MW at 2000 different sites across the country. Sites of up to 50 MW have been identified in Ontario and Manitoba. This study performed a market assessment on low head hydro developments. Available and emerging technologies for developing low head hydro were identified. The economics of low head hydro in Canada were explored, and barriers to low head hydro development were identified. Strategies to promote low head hydro development were also explored, and the impact of different incentive types on the low head hydropower market were estimated using a simple economic model. It was concluded that a reduced, streamlined, and standardized environmental assessment process will significantly benefit low head hydro development in Canada. 5 refs., 14 tabs., 17 figs

  17. Problems related to small electric power plants development: the Amazon region case; Problematica de desenvolvimento das PCH: o caso da regiao Amazonica

    Energy Technology Data Exchange (ETDEWEB)

    Fabrizy, M.P.; Maciel, F.A.A.; Luczynski, E. [Sao Paulo Univ., SP (Brazil). Programa Interunidades de Pos-Graduacao em Energia

    1994-07-01

    This paper compares the alternatives for the energy exploration for supplying the isolated communities of the interconnected network. The comparison is performed by weighting the viability of mini, micro and small hydroelectric power plants installation, in detriment of the Diesel generators and the expansion of the interconnected system, considering the existence of local hydrological potential.

  18. FY 2000 report on the development of hydrothermal use power plant, etc. Development of the binary cycle power plant (Development of a 10MW class plant); 2000 nendo Nessui riyo hatsuden plant tou kaihatsu. Bainari cycle hatsuden plant no kaihatsu - 10MW kyu plant no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    For the purpose of developing a 10MW class demonstrative plant for geothermal binary power generation, the R and D were carried out, and the results obtained from FY 1995 to FY 1999 were summed up. In the interim evaluation made in July 1994, study was to be phasedly proceeded with for the main three systems (hydrothermal system, medium system and power generation system) which compose the 10MW class binary cycle power plant. The test on the hydrothermal system was started in FY 1995. In the R and D, the following were conducted for evaluation: design/manufacture/installation of the test device for the hydrothermal system, manufacture of demonstrative downhole pump (DHP) No.3 and test at plant, test on the hydrothermal system. As to the turbine working medium suitable for binary power plant, the specified freon/substitute freon have been used, but it seems that hydrocarbons such as butane and pentane can be effective in future. In the study of the economical efficiency, it was pointed out that for the commercialization, it is important to improve durability of DHP and further reduce the cost of DHP equipment and cost of repairs. (NEDO)

  19. Hybrid solar central receiver for combined cycle power plant

    Science.gov (United States)

    Bharathan, Desikan; Bohn, Mark S.; Williams, Thomas A.

    1995-01-01

    A hybrid combined cycle power plant including a solar central receiver for receiving solar radiation and converting it to thermal energy. The power plant includes a molten salt heat transfer medium for transferring the thermal energy to an air heater. The air heater uses the thermal energy to preheat the air from the compressor of the gas cycle. The exhaust gases from the gas cycle are directed to a steam turbine for additional energy production.

  20. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is

  1. Small and medium power reactors: the past, present and future

    International Nuclear Information System (INIS)

    Smith, T.G.G.

    1987-01-01

    The history of small and medium power reactors (SMPRs) is reviewed. Although the power range goes up to plants with an electricity output of 600MWe, the focus is on plants of 250-300 MWe. The role of the International Atomic Energy Agency in promoting their use for electrical energy production for developing countries is examined. It can be shown that there is a considerable potential market for SMPRs which will increase later this century and into the next. There are, however, a number of problems to be overcome. These are not in the technical aspects but problems of costs and financing. Thus efforts should be made to reduce capital costs, shorten construction time and find potential customers who are acceptable borrowers to the international banking world. Various types of reactor are examined. (U.K.)

  2. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    International Nuclear Information System (INIS)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  3. Modelling utilization of the decision of the motor utilization level in small scale hydroelectric power plants; Utilizacao de modelagem para escolha do indice de motorizacao de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Saliba, Aloysio Portugal M.; Santos, Robson Siqueira Filadelfo dos [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Dept. de Engenharia Nuclear; Pinotto, Marcos; Martinez, Carlos Barreira [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Dept. de Engenharia Hidraulica e Recursos Hidricos

    1997-12-31

    The actual picture of the national electric generation demonstrate that there is a demand for small Hydroelectric Plants (SHP`s). The model described here allows the evaluation of different basic arrangements in function of hydrologic, hydraulic, economic and electric parameters. The very useful feature of this methodology is that it has been designed specifically for SHP`s allowing rapid convergence. A study case is presented to illustrate a practical use of the described model. (author) 9 refs., 5 figs., 2 tabs.

  4. Slovak power stations, Nuclear power plants Jaslovske Bohunice. (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. These activities are reported under the headings: (1) Foreword by the director of Bohunice NPPs; (2) Management of Bohunice NPPs Subsidiary Plant; (3) The most significant events of the year 1997; (4) Electricity and heat production; (5) Safety; (6) Bohunice NPPs operation impact on environment; (7) The V-1 NPP and V-2 NPP upgrading; (8) Maintenance; (9) Capital construction; (10) Economic balance; (11) International co-operation; (12) Human sources; (12) Public relations

  5. Progress and expectations in the field of conventional power plant technology

    International Nuclear Information System (INIS)

    Simon, M.; Harder, H.

    1993-01-01

    By increasing the medium temperature of the heat supply the efficiency of the power plants will be increased and the CO 2 emission reduced. In this respect three development lines are being followed. They are: - Further development of the high temperature process, - pressure loaded processes with fluidized-bed combustion, - combined cycle power plants with coal gasification. (DG) [de

  6. Hydroelectric project at Angliers : Investigation and public hearing report

    International Nuclear Information System (INIS)

    Girard, S.; Bouchard, B.

    2003-08-01

    Public hearings were held by the Bureau d'audiences publiques sur l'environnement concerning a proposed hydroelectric development project at Angliers, Quebec. The proposed hydroelectric plant is to be located at the outlet of the Des Quinze reservoir in the Temiscamingue region (northwest of the province). The site is within the municipality of Angliers, approximately 130 kilometres south of Rouyn-Noranda. The project will exploit the hydroelectric potential of the Ottawa River through a dam at Des Quinze reservoir, which is currently the property of the federal government. During the hearings, several issues were raised, and various topics examined. The political and administrative framework was reviewed, as well as the integration of the project within the community. The impacts, environmental as well as economic, were discussed. After careful examination of all the information, the Commission concluded that the hydroelectric project at Angliers was justified and acceptable from an environmental perspective. The expected economic impact on the community was an essential aspect in determining if the project was acceptable. refs., 4 figs

  7. Electric power engineering in the Taiwan Chinese Republic

    International Nuclear Information System (INIS)

    Kozlov, V.B.

    1992-01-01

    The data charaterizing the status and prospects of development of electric power engineering in the Taiwan Chenese Republic are given. The Tainwan electric power consumptions are covered by operation of 56 large electric power plants (nuclear, thermal, hydroelectric ones). The marginal majority (58.1%) of the registered power is generated at thermal power plants. Electric power generation in 1991 amounted to 89639 million kWxh. At that 33878 million kWxh or about 37.9% were produced at NPPs

  8. Fiscal 1980 Sunshine Project research report. Development of hydrothermal power plant (Development of binary cycle power plant). Supplement. Research on plant technology; 1980 nendo nessui riyo hatsuden plant no kaihatsu seika hokokusho. Binary cycle hatsuden palnt no kaihatsu bessatsu (plant gijutsu kenkyu chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    Research was made on new geothermal power plant technologies such as downhole pump and dual boiler for development of the 10MW class binary cycle power plant using geothermal energy. In heat cycle calculation of dual boilers, the cycle performance of a subcritical multi-stage evaporation cycle with R-114 heat medium was obtained through cycle calculation, heat conduction calculation and profitability calculation. The calculation result suggested possible considerable reduction of heat loss due to heat exchange at a preheater and evaporator, and considerable reduction of discharge loss of hot water by such multi-stage evaporation cycle. In American, every geothermal binary cycle power plant adopts pressurized heat exchange between hot water and heat medium by using downhole pumps, and pressurized reinjection of hot water into the ground. Since downhole pump itself not yet satisfies its requirements enough, it is said that Department of Energy is now under consideration on the future R and D. (NEDO)

  9. [Malaria and hematological aspects among residents to be impacted by reservoirs for the Santo Antônio and Jirau Hydroelectric Power Stations, Rondônia State, Brazil].

    Science.gov (United States)

    Katsuragawa, Tony Hiroshi; Cunha, Roberto Penna de Almeida; de Souza, Daniele Cristina Apoluceno; Gil, Luiz Herman Soares; Cruz, Rafael Bastos; Silva, Alexandre de Almeida E; Tada, Mauro Shugiro; da Silva, Luiz Hildebrando Pereira

    2009-07-01

    In Rondônia State, Brazil, two new hydroelectric plants, Santo Antônio and Jirau, are scheduled for construction on the Madeira River, upriver from the State capital, Porto Velho. The current study analyzes malaria prevalence before the construction and provides information on the possible impacts of malaria burden related to the influx of thousands of persons attracted by direct and indirect employment opportunities. According to the findings, malaria is present throughout the region, with varying prevalence rates. The existence of potential asymptomatic malaria carriers among the local population may be epidemiologically relevant and should be considered in the malaria control programs organized by public authorities and companies responsible for building the power plants, aimed at early diagnosis and treatment, vector control, water supply, and infrastructure in the urban areas.

  10. Report on the development perspectives of the hydroelectric production in France

    International Nuclear Information System (INIS)

    2006-03-01

    This report, presented to the Ministry of the Economy, the Finances and the Industry, has been realized by the high ranking of the sustainable development of the Ministry. It presents the synthesis of the working group study at the second half year 2005 and proposes to the Ministry some practical actions to develop the hydroelectric production in France. After a presentation of the hydro electric-power challenges and potential, the author discusses the regulatory context of the hydroelectric power development, the conditions of this development and proposes some actions. (A.L.B.)

  11. Deep geothermal resources in Quebec and in Colombia: an area that may develop based on French experience on geothermal power plants

    International Nuclear Information System (INIS)

    Blessent, D.; Raymond, J.; Dezayes, C.

    2016-01-01

    Because of an increasing demand in electricity and a necessity of reducing greenhouse gas emissions, several countries envisage the development of the renewable energies. The geothermal energy is a particularly interesting alternative because it allows a production of electricity which is not influenced by weather conditions and it requires relatively restricted surface areas compared, for example, to the area required by a hydroelectric power plant. The literature review presented here summarizes the main characteristics of the geothermal potential in Quebec, in sedimentary basins, and in Colombia, in the area of the Nevado del Ruiz volcanic complex. Currently, in these two regions, the hydro-electric power dominates the electricity production, but there is a similar interest to the development of geothermal power plants. The French sites of Soultz-sous-Forets in Alsace and Boiling in Guadeloupe are respectively presented as an example of exploitation of geothermal improved systems (Enhanced Geothermal System; EGS) and geothermal resources in volcanic regions. The first site constitutes a model for the future development of the deep geothermal exploitation in Quebec, whereas the second is an example for Colombia. A description of environmental impacts related to the exploitation of deep geothermal resources is presented at the end of this paper. (authors)

  12. [The assessment of the general functional status and of the psychosomatic complaints of workers at hydroelectric power plants].

    Science.gov (United States)

    Danev, S; Dapov, E; Pavlov, E; Nikolova, R

    1992-01-01

    Evaluation of the general functional status and psychosomatic complaints of 61 workers from the hydroelectric power stations is made. The following methods are used: 1. Assessment of the general functional state, by means of computer analysis of the cardiac variability, analysing the changes in the values of the following indices: average value of the cardiac intervals (X), their standard deviation (SD), coefficient of variation (CV), amplitude of the mode (AMO), index of stress (IS), index of the vegetative balance (IVB), homeostatic index (HI). The last 3 indices serve for determination of the complex evaluation of chronic fatigue and work adaptation (ChFWA). 2. Evaluation of the psychosomatic complaints, by the use of a questionnaire for the subjective psychosomatic complaints. 3. Studying the systolic and diastolic blood pressure. The average values received in workers from HPS were compared with the average values of the population of the country and with the average values of a similar working activity of a group of operators from the thermal power station HPS. In conclusion it could be noted that concerning ChFWA the received values in workers from HPS are not more unfavourable generalized values from that measured in workers, occupied with similar type of work in other industrial branches of the country. However, they are with more unfavourable data in comparison with the workers from HPS. The subjective evaluation of the operators concerning their psychic and body health status is moderately worse, both in comparison with the values of the index for the country, and in comparison with those of the operators from HPS.

  13. Environmental consequences of hydroelectric development: the role of facility size and type

    International Nuclear Information System (INIS)

    Gleick, P.H.

    1992-01-01

    The development of hydroelectric power throughout the world is receiving renewed attention as the economic, political, and environmental costs of conventional energy production rise. There is currently a perception that hydroelectricity has environmental and economic advantages over electricity produced by conventional energy technologies, but there is a paucity of information about the environmental impacts of hydroelectric facilities as a function of size and type. We characterize the environmental impacts of hydroelectric developments and quantify these impacts as a function of the size and type of project. Several unexpected conclusions arise from our analysis. For most hydroelectric facilities, size, as measured by installed capacity, is not necessarily a good indicator or the severity of environmental costs. For impacts such as land flooded and evaporative water lost, smaller facilities cause greater environmental disruptions per unit of energy produced than do larger facilities. (Author)

  14. Combined solar photovoltaic and hydroelectric pumped storage power plant

    International Nuclear Information System (INIS)

    Gzraryan, R.V.

    2009-01-01

    Combined model of solar photovoltaic and pumped storage stations aimed at power supply for 40 rural houses are considered. The electric circuits of station and their acting regularities are developed and submitted. The both generation curve of photovoltaic station and load curve of electrical customer are considered. The power of hydraulic unit, pumping unit and photovoltaic station are calculated

  15. Stillwater Hybrid Geo-Solar Power Plant Optimization Analyses

    Energy Technology Data Exchange (ETDEWEB)

    Wendt, Daniel S.; Mines, Gregory L.; Turchi, Craig S.; Zhu, Guangdong; Cohan, Sander; Angelini, Lorenzo; Bizzarri, Fabrizio; Consoli, Daniele; De Marzo, Alessio

    2015-09-02

    The Stillwater Power Plant is the first hybrid plant in the world able to bring together a medium-enthalpy geothermal unit with solar thermal and solar photovoltaic systems. Solar field and power plant models have been developed to predict the performance of the Stillwater geothermal / solar-thermal hybrid power plant. The models have been validated using operational data from the Stillwater plant. A preliminary effort to optimize performance of the Stillwater hybrid plant using optical characterization of the solar field has been completed. The Stillwater solar field optical characterization involved measurement of mirror reflectance, mirror slope error, and receiver position error. The measurements indicate that the solar field may generate 9% less energy than the design value if an appropriate tracking offset is not employed. A perfect tracking offset algorithm may be able to boost the solar field performance by about 15%. The validated Stillwater hybrid plant models were used to evaluate hybrid plant operating strategies including turbine IGV position optimization, ACC fan speed and turbine IGV position optimization, turbine inlet entropy control using optimization of multiple process variables, and mixed working fluid substitution. The hybrid plant models predict that each of these operating strategies could increase net power generation relative to the baseline Stillwater hybrid plant operations.

  16. Benefits of fish passage and protection measures at hydroelectric projects

    International Nuclear Information System (INIS)

    Cada, G.F.; Jones, D.W.

    1993-01-01

    The US Department of Energy's Hydropower Program is engaged in a multi-year study of the costs and benefits of environmental mitigation measures at nonfederal hydroelectric power plants. An initial report (Volume 1) reviewed and surveyed the status of mitigation methods for fish passage, instream flows, and water quality; this paper focuses on the fish passage/protection aspects of the study. Fish ladders were found to be the most common means of passing fish upstream; elevators/lifts were less common, but their use appears to be increasing. A variety of mitigative measures is employed to prevent fish from being drawn into turbine intakes, including spill flows, narrow-mesh intake screens, angled bar racks, and lightor sound-based guidance measures. Performance monitoring and detailed, quantifiable performance criteria were frequently lacking at non-federal hydroelectric projects. Volume 2 considers the benefits and costs of fish passage and protection measures, as illustrated by case studies for which performance monitoring has been conducted. The report estimates the effectiveness of particular measures, the consequent impacts on the fish populations that are being maintained or restored, and the resulting use and non-use values of the maintained or restored fish populations

  17. N2O4 as a working substance for a spacecraft power plant

    International Nuclear Information System (INIS)

    Popyrin, L.S.; Starostenko, N.N.; Starostenko, V.I.

    1975-01-01

    A gas turbine cycle on dissociating nitrogen tetroxide (N 2 O 4 ) as working medium is considered. Nitrogen tetroxide has a number of properties advantageous in this respect. A direct cycle power plant is considered. A fast reactor with a gas coolant is an energy source. Some versions of a power plant have been analysed for the gas temperature at the turbine inlet ranging from 1170 to 1470 K. The cycle efficiency is found to increase considerably with the working medium temperature rise at the turbine inlet only to 1380-1400 K. To determine the efficiency of the plants of this type, they are compared to identical designs of gas and gas-liquid cycles on alkali metals, inert gases and dissociating phosphorus. Theoretical and experimental data show that the turbine with nitrogen tetroxide as working medium is more compact in comparison to that with inert gases. Small specific surfaces of the radiator, small size of the turbine and thermal process equipment, and high efficiency are evidence of the advisability of using the plant of the type considered as on-board power plant of a space ship

  18. New markets for small-scale hydro

    International Nuclear Information System (INIS)

    Maurer, E.A.

    1997-01-01

    The market for small and medium sized hydro-electric power plant is more attractive than ever. The boom in Europe has increasingly spread to the emerging countries, and here too small hydro plays an important ecological role. In addition to new plant rehabilitation of 'historical' plant is now a major factor. The last few years have seen a market shift from single machine components to complete plant and systems, requiring a strategy re-think on the part of larger companies. Following the influx of private capital into the power industry, business conditions have also undergone a thorough transformation. In place of 'fast money', hydro power offers the prospect of earning longer-term, sustainable money'. The term small-scale hydro-electric power (or simply 'small hydro') is used slightly differently depending on the country and market. Here, it is used to denote plant with turbines up to 10 MW. (Author)

  19. Social and environmental impacts of the James Bay hydroelectric project

    International Nuclear Information System (INIS)

    Hornig, J.F.

    1999-01-01

    The book, which is an analysis and not an advocacy, examines the anatomy of the controversy that has swirled around the James Bay project - the La Grande and Great Whale projects combined - from the 1970s to the 1990s, and seeks, in the process, to determine whether there are lessons that can be learned from such an analysis that are applicable to other cases as well as to James Bay itself. The contributors are interested, at one and the same time, in finding ways to integrate the knowledge of natural scientists and social scientists to deepen the understanding of human/environment relations and to link science and policy to encourage a productive dialogue between practitioners and scholars in this increasingly important area of inquiry. The contributor's papers include the following: introduction to the issues; hydroelectric power development at James Bay: establishing a frame of reference; James Bay: environmental considerations for building large hydroelectric dams and reservoirs in Quebec; elevated mercury in fish as a result of the James Bay hydroelectric power development: perception and reality; the Cree people of James Bay: assessing the social impacts of hydroelectric dams and reservoirs; culture, social change, and Cree opposition to the James Bay hydroelectric development; and the impact of James Bay hydroelectric development on the art and craft of the James Bay Cree. The authors of the volume have attempted to stand back and examine just a few of these issues from the perspective of a variety of disciplines, and their purpose is to inform and stimulate thoughtful consideration by providing an overall perspective that might might serve to broaden the context in which specific issues can be debated. refs., 3 tabs., 5 figs

  20. Possibilities for retrofitting of the existing thermal electric power plants using solar power technologies

    International Nuclear Information System (INIS)

    Matjanov, Erkinjon K.; Abduganieva, Farogat A.; Aminov, Zarif Z.

    2012-01-01

    Full text: Total installed electric power output of the existing thermal electric power plants in Uzbekistan is reaches 12 GW. Thermal electric power plants, working on organic fuel, produce around 88 % of the electricity in the country. The emission coefficient of CO 2 gases is 620 gram/kwph. Average electric efficiency of the thermal electric power plants is 32.1 %. The mentioned above data certifies, that the existing thermal electric power plants of Uzbekistan are physically and morally aged and they need to be retrofitted. Retrofitting of the existing thermal electric power plants can be done by several ways such as via including gas turbine toppings, by using solar technologies, etc. Solar thermal power is a relatively new technology which has already shown its enormous promise. With few environmental impacts and a massive resource, it offers a comparable opportunity to the sunniest Uzbekistan. Solar thermal power uses direct sunlight, so it must be sited in regions with high direct solar radiation. In many regions, one square km of land is enough to generate as much as 100-120 GWh of electricity per year using the solar thermal technology. This is equivalent to the annual production of a 50 MW conventional coal or gas-fired mid-load power plant. Solar thermal power plants can be designed for solar-only or for hybrid operation. Producing electricity from the energy in the sun's rays is a straightforward process: direct solar radiation can be concentrated and collected by a range of Concentrating Solar Power technologies to provide medium- to high temperature heat. This heat is then used to operate a conventional power cycle, for example through a steam turbine or a Stirling engine. Solar heat collected during the day can also be stored in liquid or solid media such as molten salts, ceramics, concrete or, in the future, phase-changing salt mixtures. At night, it can be extracted from the storage medium thereby continuing turbine operation. Currently, the

  1. Downstream impacts of a Central Amazonian hydroelectric dam on tree growth and mortality in floodplain forests

    Science.gov (United States)

    Resende, A. F. D.; Silva, T. S. F.; Silva, J. D. S.; Piedade, M. T. F.; Streher, A. S.; Ferreira-Ferreira, J.; Schongart, J.

    2017-12-01

    The flood pulse of large Amazonian Rivers is characterized by predictable high- and low-water periods during the annual cycle, and is the main driving force in the floodplains regulating decomposition, nutrient cycles, productivity, life cycles and growth rhythms of floodplains' biota. Over at least 20 millions of years, tree species in these ecosystems developed complex adaptative mechanisms to tolerate flooding, such as the tree species Macrolobium acaciifolium (Fabaceae) and Eschweilera tenuifolia (Lecythidaceae) occupying the lower topographic positions in the floodplain forests along the oligothrophic black-water rivers. Tree growth occurs mainly during terrestrial phase, while during the aquatic phase the anoxic conditions result into a cambial dormancy and formation of annual tree rings. The hydroelectric dam Balbina which was installed in the Uatumã River (central Amazonia) during the 1980s altered significantly the flood pulse regime resulting into higher minimum and lower maximum annual water levels. The suppression of the terrestrial phase caused large-scale mortality of flood-adapted trees growing on the lower topographic positions, as evidenced by radiocarbon dating and cross-dating techniques (dendrochronology). In this study we estimated the extension of dead forests using high resolution ALOS/PALSAR radar images, for their detection along a fluvial distance of more than 280 km downstream of the power plant. Further we analyzed tree growth of 60 living individuals of E. tenuifolia by tree-ring analyses comparing the post- and pre-dam periods. We evaluated the impacts of the altered hydrological regime on tree growth considering ontogenetic effects and the fluvial distance of the trees to the dam. Since the Balbina power plant started operating the associated igapó forests lost about 11% of its cover. We found a significant reduction of tree growth of E. tenuifolia during the post-dam period as a consequence of the increasing aquatic phase duration

  2. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 6. Northeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comparison, the available data represent about 6% of the total capacity and 11% of the hydroelectric energy potential estimated for the entire US. Of the total capacity estimated for the region, 6100 MW has been installed. The remainder (27,200 MW, excluding the undeveloped capacity in the New England States) is the maximum which could be developed by upgrading and expanding existing projects (18,700 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (8500 MW). Small-scale facilities account for about 15% of the region's total installed capacity, but another 1800 MW could be added to these and other small water-resource projects. In addition, 500 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of New York, Maine, and New Hampshire having the largest potential for incremental development at existing projects in the Northeast region. West Virginia, Maryland, Delaware, New Jersey, Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island, New Hampshire, Vermont, and Maine comprise the Northeast region.

  3. Ecological improvements to hydroelectric power plants under EEG. Guidance to environmental verifiers and water rights authorities; Oekologische Verbesserungsmassnahmen an Wasserkraftanlagen gemaess EEG. Leitfaden fuer Umweltgutachter und Wasserrechtsbehoerden

    Energy Technology Data Exchange (ETDEWEB)

    Meyr, Christoph; Pfeifer, Hansjoerg [EVIT GmbH Ingenieurbuero Unternehmensberatung, Muenchen (Germany); Schnell, Johannes; Hanfland, Sebastian [Landesfischereiverband Bayern e.V., Muenchen (Germany)

    2011-11-15

    The use of hydropower as a renewable form of energy is experiencing a renaissance due to the energy transition in Bavaria. The fishery evaluate not uncritically this development, because hydroelectric plants generally normally represent a considerable intervention in water and therefore in the habitat of the fish. In this case it should be noted that just often not even the minimum requirements of ecology are fulfilled at existing plants according to the Federal Water Act. [German] Die Nutzung der Wasserkraft als regenerative Energieform erlebt aufgrund der Energiewende in Bayern derzeit eine Art Renaissance. Die Fischerei bewertet diese Entwicklung nicht unkritisch, stellen Wasserkraftanlagen in der Regel doch einen erheblichen Eingriff in Gewaesser und somit den Lebensraum der Fische dar. Dabei ist festzustellen, dass gerade an bestehenden Anlagen haeufig nicht einmal die Mindestanforderungen der Oekologie erfuellt werden, wie sie das Wasserhaushaltsgesetz vorschreibt.

  4. Hydroelectricity and sustainable development

    International Nuclear Information System (INIS)

    Dubeau, D.

    1995-01-01

    From 1975 to 1992, hydroelectricity helped reduce greenhouse gas emissions in Quebec by 20%. For Hydro-Quebec, energy conservation and hydroelectric development are basic complementary tools for sustainable development. Recent studies show that developing only 50% of economically exploitable hydroelectric potential (30% of the gross theoretical potential) of different regions worldwide would considerably reduce greenhouse gas and SO 2 emissions. However, hydroelectric systems produce environmental and social impacts locally that require mitigative measures. To fulfill its mandate in a sustainable development context, Hydro-Quebec has adopted methods such as integrated resource planning, the assessment of externalities, multi criteria decision tools and public participations

  5. Purification of ammonia-containing trap waters from atomic power plant by ozone treatment

    International Nuclear Information System (INIS)

    Grachok, M.A.; Prokudina, S.A.; Shulyat'ev, M.I.

    1990-01-01

    The aim of research was to study the process of ozonation of ammonia-containing trap waters from the Kursk Atomic Power Plant both on the model solutions and on real ones. Different factors (pH of the medium, temperature, concentration of the initial substances) have been studied for their effect on ozonation of aqueous ammonia solutions, model solutions of trap waters from the Kursk Atomic Power Plant as well as ammonia-containing trap waters and liquid radioactive wastes delivered to special water treatment at the Kursk Atomic Power Plant. It is shown that in all the cases the highest rate of ammonia oxidation by ozone is observed in the alkaline medium (pH 1.4-11.0) and at 55 deg C. The obtained results have shown that a method of ozonation followed by evaporation of water to be purified can be used to treat ammonia-containing waters from atomic power plant

  6. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  7. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    Science.gov (United States)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  8. Influence of Egyptian electrical grid and nuclear power plants under disturbances based on PSS/E

    International Nuclear Information System (INIS)

    Shaat, M. K.; Kotb, S. A.; Mahmoud, H. M.

    2012-12-01

    The capacity of the electrical power system in Egypt will increase rapidly in the coming twenty years. In year 2018, power generation will be connecting to the Egyptian electrical grid. Consequently, the interaction of nuclear power plants and other systems become a very important issue, and a detailed nuclear power model for the medium-term and long-term power system stability should be developed. However, there is no nuclear unit model that can describe the detailed characteristics of the nuclear unit in the available commercial power system simulation software. In this paper, a detailed pressurized water reactor (PWR) nuclear unit model for medium-term and long-term power system transient stability is proposed. The model is implemented by a user defined program in PSS/E through PSS/E Mat lab Seamanlike interface. Also this paper proposes a design of power plant rector controller for the nuclear power plant. This model can be used to analyze the difference influences between the Egyptian electrical grid and nuclear power plants for examples transient fault on electrical grid and outage of nuclear power plant. The simulation results show that the proposed model is valid. (Author)

  9. Alternative trends in development of thermal power plants

    International Nuclear Information System (INIS)

    Prisyazhniuk, Vitaly A.

    2008-01-01

    Thermal (or fossil fuel) power plants (TPP) are the major polluters of man's environment, discharging into the atmosphere the basic product of carbon fuel combustion, CO 2 . It is this very gas that accounts for the greenhouse effect causing the global climate warm-up on our planet. A natural solution of the problem of reducing carbon dioxide discharge into the atmosphere lies in power saving, thus reducing the amount of the fuel burnt. This approach can be justified from any standpoint, both economically and ecologically. The ideal way of solving the problem would be to completely give up burning carbon-containing fuel, such as coal, petroleum products, and other power resources of organic nature. This work is intended to outline the ways of reducing consumption of fuel by TPP and, consequently, of reducing their discharging into the atmosphere the gases producing the greenhouse effect. One of the ways lies in changing the thermophysical characteristics of the working medium, which becomes possible if we can modify the conventional working medium, that is water, or can use some working medium with quite different thermophysical properties. The article dwells on various technological ways providing for a practical solution of the problem, such as the Kalina cycle; modification of water properties by way of magneto-hydrodynamic resonance (MHD resonance); and employing, in the thermodynamic cycle of Thermal Power Plants, liquids boiling at temperatures which are lower than that of the environment

  10. High Falls Hydroelectric Plant feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Diezemann, Gustav A.

    1979-07-01

    This study was made in order to determine if re-activating the retired High Falls Hydro Station in New York would result in a more economical generation of some of the power required in the Central Hudson System than is being obtained with the oil-burning thermal plants. The findings show that the construction of a new plant is more economical than rehabilitation of the existing station. All new construction schemes are marginally unattractive at today's costs but are found to become profitable within a short period as alternative energy sources escalate in price. A new powerhouse with an installed capacity of 2390 kW proved most economical, and its construction is recommended.

  11. Feasibility assessment, Lowell Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-04-01

    The results are presented of a feasibility analysis for hydroelectric generating facilities on the Merrimack River at Lowell, Massachusetts. The projected facility would utilize the existing Pawtucket Dam and a portion of the existing Northern Canal. The project was examined for economic, engineering, and environmental viability, and the results are favorable. The owners intend to proceed to the next step of negotiating a firm power purchase agreement.

  12. Economic feasibility constraints for renewable energy source power production

    International Nuclear Information System (INIS)

    Biondi, L.

    1992-01-01

    Suitable analysis criteria for use in economic feasibility studies of renewable energy source power plants are examined for various plant types, e.g., pumped storage hydroelectric, geothermal, wind, solar, refuse-fuelled, etc. The paper focusses on the impacts, on operating cost and rate structure, of the necessity, depending on demand characteristics, to integrate renewable energy source power production with conventional power production in order to effectively and economically meet peak power demand. The influence of commercialization and marketing trends on renewable energy source power plant economic feasibility are also taken into consideration

  13. Fuzzy logic and its possibility using in automation of small-scale hydroelectric power plants regulation

    International Nuclear Information System (INIS)

    Puskajler, J.

    2004-01-01

    The paper explains how can computer understand and process inaccurate (indefinite) information. It is processing of terms like e.g. 'around in the middle of month' or 'not too big'. Fuzzy logic, fuzzy sets, operations with them, fuzzy rules and using of linguistics variables are explained. The possibilities of application of fuzzy systems in automation of regulation of small-scale hydro power plants are discussed. (author)

  14. Comparison of Medium Power Hall Effect Thruster Ion Acceleration for Krypton and Xenon Propellants

    Science.gov (United States)

    2016-09-14

    Pumping is provided by four single-stage cryogenic panels (single-stage cold heads at 25 K) and one 50 cm two stage cryogenic pump (12 K). This vacuum...test chamber has a mea- sured pumping speed of 36 kL/s on xenon. The Hall thruster used in this study is a medium power laboratory Hall effect...The first compo- nent passes through a krypton opto-galvanic cell and is terminated by a beam dump . The opto-galvanic cell current is capacitively

  15. A modelling methodology for assessing the impact of climate variability and climatic change on hydroelectric generation

    International Nuclear Information System (INIS)

    Munoz, J.R.; Sailor, D.J.

    1998-01-01

    A new methodology relating basic climatic variables to hydroelectric generation was developed. The methodology can be implemented in large or small basins with any number of hydro plants. The method was applied to the Sacramento, Eel and Russian river basins in northern California where more than 100 hydroelectric plants are located. The final model predicts the availability of hydroelectric generation for the entire basin provided present and near past climate conditions, with about 90% accuracy. The results can be used for water management purposes or for analyzing the effect of climate variability on hydrogeneration availability in the basin. A wide range of results can be obtained depending on the climate change scenario used. (Author)

  16. Flexible power generation systems and their planning

    International Nuclear Information System (INIS)

    Schwarzenbach, A.; Wunsch, A.K.

    1989-01-01

    By determining their specific annual costs and expressing them in relation to the period of utilization or to the load factor, it is possible to compare the relative merits of different combinbations of power generation systems. This method, with which unsuitable planning variants can be eliminated without having to go through long, intricate calculations and without taking up costly computer time, has the advantage that it points up the origin of the costs and at the same time makes clear how improvement can be achieved by combining base-load, medium-load and peak-load plants. The different types of power plant (hydro-electric, nuclear, steam, gas-turbine, combined cycle, cogeneration and coal gasification) are characterized by their approximate specific capital investment, construction period, efficiency, fuel, duty, and time from cold start to full load. They are compared by plotting their total specific annual costs in SFr/kWa against the load factor. The special benefits which combined cycle plants, with gas turbines, heat-recovery boilers and steam plant, can offer today (not only high fuel utilization and relatively low first-time costs, but also the short time needed for planning and construction) are underlined. 5 refs.; 9 figs.; 3 tabs

  17. Electricite de France Strategy for its nuclear power plants' decommissioning programme

    International Nuclear Information System (INIS)

    Knockaert, J.M.; Gatineau, J.P.

    1992-01-01

    Although final shutdown of the first large PWR Power Stations should not occur before 2015, Electricity of France is nevertheless directly concerned by the decommissioning of its nuclear plants. The shutdown programme of the gas-graphite units is in progress and the medium-power PWR plant (300 MWe) installed at Chooz in the Ardennes will be finally shutdown at the end of 1991. This solution requires EDF to have a policy available which enables it to simultaneously run the double operation 'Plant shutdown-decommissioning' and 'New constructions-increasing available power' from both the technical and financial viewpoints. (author)

  18. Use of mediation to resolve the dispute over low-head hydroelectric development at Swan Lake

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, D.

    1980-08-01

    In 1978, the Maine Hydroelectric Development Corporation announced that the company planned to renovate five dams on the Goose River near Belfast, Maine to generate electricity. The most important part of the plan involved the use of the first of the dams, at the lower end of Swan Lake, to regulate the flow of water to the downstream dams. For Maine Hydro, management of the Swan Lake dam could make an otherwise marginal proposal lucrative. However, Swan Lake is vitally important to the residents of Swanville. The town was so concerned about the impact of this proposed hydroelectric project that it petitioned the Federal Energy Regulatory Commission (FERC) to deny Maine Hydro's application on the grounds that it would damage the environment, reduce property values and eliminate recreational opportunities for its citizens. This report was written by the mediator of the dispute and represents the views and behavior of the parties as the mediator understood them. It is intended to present the mediator's observations in a way which will inform and assist others who may someday face a difficult situation like the one the Town of Swanville and Maine Hydroelectric Development Corporation faced, and successfully resolved, in the spring and summer of 1979.

  19. Optimization of the daily operation of the plants of Medio Sao Francisco; Otimizacao da operacao diaria das usinas do Medio Sao Francisco

    Energy Technology Data Exchange (ETDEWEB)

    Fernandes, Jessica Pillon Torralba; Colnago, Glauber Renato; Correia, Paulo de Barros; Ohishi, Takaaki [Universidade Estadual de Campinas (UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica. Dept. de Energia], emails: pillon@fem.unicamp.br, colnago@fem.unicamp.br, pcorreia@fem.unicamp.br, taka@densis.fee.unicamp.br

    2010-07-01

    This paper presents an optimization model for daily operation of Sao Francisco hydroelectric power plants. The study considers eight power plants - Sobradinho (USB), Luiz Gonzaga (ULG), Apolonio Sales (UAS), Paulo Afonso I, II, III, (UPA), Paulo Afonso IV (USQ) e Xingo (UXG)- belongs to Sao Francisco Hydroelectric Company (CHESF). Its objective is to maximize the power plant efficiency and to minimize the number of startup and shutdowns of generating units (GU), simultaneously. Considering those GU are equal, is determined the number of units to be dispatched and their charge. The optimal dispatch, linear and non-linear programming techniques and genetic algorithms (GA) support this article. (author)

  20. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3730-005] Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have...

  1. Nuclear power plants

    International Nuclear Information System (INIS)

    1985-01-01

    Data concerning the existing nuclear power plants in the world are presented. The data was retrieved from the SIEN (Nuclear and Energetic Information System) data bank. The information are organized in table forms as follows: nuclear plants, its status and type; installed nuclear power plants by country; nuclear power plants under construction by country; planned nuclear power plants by country; cancelled nuclear power plants by country; shut-down nuclear power plants by country. (E.G.) [pt

  2. A new MV bus transfer scheme for nuclear power plants

    International Nuclear Information System (INIS)

    Chang, C.K.

    2015-01-01

    The auxiliary power system of many generating stations consists of offsite power supply system and onsite power supply system, including emergency diesel generators (EDG) to provide secure power to auxiliary loads. If a normal power supply fails to supply power, then the power source is transferred to a standby power supply. In the case of nuclear power plants (NPP), the unit auxiliary transformer (UAT) and standby auxiliary transformer (SAT) - or station service transformer - are installed and powered from 2 offsite power circuits to meet regulatory requirements. The transfer methods of a motor bus from a normal source to a standby source used in power generating stations are fast bus transfer, in-phase transfer, or residual transfer. Fast bus transfer method is the most popular and residual voltage transfer method that is used as a backup in medium voltage buses in general. The use of the advanced technology like open circuit voltage prediction and digital signal processing algorithms can improve the reliability of fast transfer scheme. However, according to the survey results of the recent operation records in nuclear power plants, there were many instances where the fast transfer scheme has failed. To assure bus transfer in any conditions and circumstances, un-interruptible bus transfer scheme utilizing the state of the art medium voltage UPS (Un-interruptible Power Supply) is discussed and elaborated

  3. Safety culture in nuclear power plants. Proceedings

    International Nuclear Information System (INIS)

    1994-12-01

    As a consequence of the INSAG-4 report on 'safety culture', published by the IAEA in 1991, the Federal Commission for the Safety of Nuclear Power Plants (KSA) decided to hold a one-day seminar as a first step in this field. The KSA is an advisory body of the Federal Government and the Federal Department of Transport and Energy (EVED). It comments on applications for licenses, observes the operation of nuclear power plants, assists with the preparation of regulations, monitors the progress of research in the field of nuclear safety, and makes proposals for research tasks. The objective of this seminar was to familiarise the participants with the principles of 'safety culture', with the experiences made in Switzerland and abroad with existing concepts, as well as to eliminate existing prejudices. The main points dealt with at this seminar were: - safety culture from the point of view of operators, - safety culture from the point of view of the authorities, - safety culture: collaboration between power plants, the authorities and research organisations, - trends and developments in the field of safety culture. Invitations to attend this seminar were extended to the management boards of companies operating Swiss nuclear power plants, and to representatives of the Swiss authorities responsible for the safety of nuclear power plants. All these organisations were represented by a large number of executive and specialist staff. We would like to express our sincerest thanks to the Head of the Federal Department of Transport and Energy for his kind patronage of this seminar. (author) figs., tabs., refs

  4. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  5. LNG plant combined with power plant

    Energy Technology Data Exchange (ETDEWEB)

    Aoki, I; Kikkawa, Y [Chiyoda Chemical Engineering and Construction Co. Ltd., Tokyo (Japan)

    1997-06-01

    The LNG plant consumers a lot of power of natural gas cooling and liquefaction. In some LNG plant location, a rapid growth of electric power demand is expected due to the modernization of area and/or the country. The electric power demand will have a peak in day time and low consumption in night time, while the power demand of the LNG plant is almost constant due to its nature. Combining the LNG plant with power plant will contribute an improvement the thermal efficiency of the power plant by keeping higher average load of the power plant, which will lead to a reduction of electrical power generation cost. The sweet fuel gas to the power plant can be extracted from the LNG plant, which will be favorable from view point of clean air of the area. (Author). 5 figs.

  6. LNG plant combined with power plant

    International Nuclear Information System (INIS)

    Aoki, I.; Kikkawa, Y.

    1997-01-01

    The LNG plant consumers a lot of power of natural gas cooling and liquefaction. In some LNG plant location, a rapid growth of electric power demand is expected due to the modernization of area and/or the country. The electric power demand will have a peak in day time and low consumption in night time, while the power demand of the LNG plant is almost constant due to its nature. Combining the LNG plant with power plant will contribute an improvement the thermal efficiency of the power plant by keeping higher average load of the power plant, which will lead to a reduction of electrical power generation cost. The sweet fuel gas to the power plant can be extracted from the LNG plant, which will be favorable from view point of clean air of the area. (Author). 5 figs

  7. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2001-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  8. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  9. The operating organization for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  10. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 2. Pacific Southwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental, and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Pacific Southwest region, the maximum physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy greater than 85,000 GWH. By comparison, these values represent about 6% of the total potential capacity and hydroelectric energy generation estimated for the entire US. Of the total capacity estimated for the region, 9900 MW has been installed. The remainder (23,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (6000 MW) and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (17,200 MW). Small-scale facilities account for less than 4% of the region's total installed capacity, but another 600 MW could be added to these and other small water resource projects. In addition, 600 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of California and Utah having the largest potential for incremental development at existing projects in the Pacific Southwest region. States comprising the Southwest are Arizona, California, Hawaii, Nevada, and Utah.

  11. Aspects of the relations between the hydroelectric constructions and environment

    International Nuclear Information System (INIS)

    Michael, I.

    1993-01-01

    By their dimensions hydroelectric constructions constitute one of the evident examples of man's action upon nature, with favorable as well as unfavorable effects. By using past experience, such effects can be correctly establish and evaluated both by specialists from different fields and by representatives of the local population. The paper proposes several criteria for qualitative characterization of such effects. Some favorable and unfavorable effects of dams, lakes, secondary catchment and derivations are discussed. Also, having in view the water flow distribution which would allow a normal insertion of such construction in the environment, despite of some power production diminish diminishing, two proposals are made concerning possible solutions for secondary catchment and the hydroelectric power stations situated in the upper zones of the rivers. (author). 5 refs

  12. Evaluation of advanced turbomachinery for underground pumped hydroelectric storage. Part 3. Multistage unregulated pump/turbines for operating heads of 1000 to 1500 m

    Energy Technology Data Exchange (ETDEWEB)

    Frigo, A.A.; Pistner, C.

    1980-08-01

    This is the final report in a series of three on studies of advanced hydraulic turbomachinery for underground pumped hydroelectric storage. All three reports address Francis-type, reversible pump/turbines. The first report covered single-stage regulated units; the second report covered two-stage regulated units; the present report covers multistage unregulated units. Multistage unregulated pump/turbines offer an economically attractive option for heads of 1000 to 1500 m. The feasibility of developing such machines for capacities up to 500 MW and operating heads up to 1500 m has been evaluated. Preliminary designs have been generated for six multistage pump/turbines. The designs are for nominal capacities of 350 and 500 MW and for operating heads of 1000, 1250, and 1500 m. Mechanical, hydraulic, and economic analyses indicate that these machines will behave according to the criteria used to design them and that they can be built at a reasonable cost with no unsolvable problems. Efficiencies of 85.8% and 88.5% in the generating and pumping modes, respectively, can be expected for the 500-MW, 1500-m unit. Performances of the other five machines are at least comparable, and usually better. Over a 1000 to 1500-m head range, specific $/kW costs of the pump/turbines in mid-1978 US dollars vary from 19.0 to 23.1 for the 500-MW machines, and from 21.0 to 24.1 for the 350-MW machines.

  13. Scheduling of head-dependent cascaded reservoirs considering discharge ramping constraints and start/stop of units

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-10-15

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning head-dependent reservoirs under competitive environment. We propose a novel method, based on mixed-integer nonlinear programming (MINLP), for optimising power generation efficiency. This method considers hydroelectric power generation as a nonlinear function of water discharge and of the head. The main contribution of this paper is that discharge ramping constraints and start/stop of units are also considered, in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve two case studies based on Portuguese cascaded hydro systems, providing a higher profit at an acceptable computation time in comparison with classical optimisation methods based on mixed-integer linear programming (MILP). (author)

  14. assessment of slope stability around gilgel gibe-ii hydroelectric

    African Journals Online (AJOL)

    preferred customer

    1 Gilgel-Gibe II Hydroelectric Project, Fofa Town, Ethiopia ... Key words/phrases: Factor of safety, plane failure, slope design, slope .... condition of potential unstable slopes along the road between Fofa town and Gilgel-Gibe Hydro- power II.

  15. Imported mineral coal: competitiveness for electric power generation in northeast of Brazil

    International Nuclear Information System (INIS)

    Codeceira Neto, A.; Ribeiro Filho, A.P.R.; Silva, S.P.R. da

    1993-01-01

    With the hydroelectric potential exhaustion of northeast and with the increase of costs to the use of hydroelectric uses available in Brazil, the thermoelectric generation will be able to become a competitive solution to attend the market of electric power. This work has as purpose describe the options of imported coal use to Brazilian northeast its technological aspects, the environmental question, and the preliminary studies of localization and the costs associated on implantation of coal thermoelectric power plants. 7 refs, 3 figs, 6 tabs

  16. Operating experience 1993 in Swedish nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    For many years, the Swedish nuclear power plants had a very good track record, compared with the international average. This trend was broken in 1993. During the year, six power plants were shut down for extended periods of time, for different safety-related reasons. During the autumn, a reactor containment leak was detected during scheduled containment leak rate testing at Barsebaeck 2. The unit was shut down for extensive investigation and corrective action for the rest of the year. Ringhals 2 was shut down last six months of the year as crack indications were found in a weld next to a control rod penetration in the reactor vessel head. Extensive tests and analyses revealed that the crack originated from the manufacturing of the vessel head and was of minor importance to safety. Oskarshamn 1 was shut down the whole year. Cracks in cold bent pipes in the residual heat removal system and cracks in the feedwater riser pipes lead to extensive replacement of piping, including pipes inside the reactor vessel. Decontamination of the reactor vessel was successful and attracted world wide interest. A programme for plant status verification was started in order to establish long-term operating conditions. Replacement of the pipe insulation and the inlet strainers in the core and containment spray systems solved the problems with clogging at certain failures in Barsebaeck, Ringhals 1 and Oskarshamn 1 and 2. Six of the reactors had an extremely high availability, of about 90 per cent and more. By year end, eleven of the twelve reactors were in full power operation

  17. Tap Water Hydraulic Systems for Medium Power Applications

    DEFF Research Database (Denmark)

    Conrad, Finn; Adelstorp, Anders

    1998-01-01

    Presentation of new range of developed tap water hydraulic componets and applications for medium power up to 4 kW and 50 bar.......Presentation of new range of developed tap water hydraulic componets and applications for medium power up to 4 kW and 50 bar....

  18. Methods for determination of motorization index in small hydroelectric power plants, considering the financial economic risk as function of the hydrological risk; Metodologia para determinacao do indice de motorizacao em PCH`S considerando o risco economico financeiro em funcao do risco hidrologico

    Energy Technology Data Exchange (ETDEWEB)

    Saliba, Aloysio Portugal Maia; Martinez, Carlos Barreira; Versiani, Bruno Rabelo [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Dept. de Engenharia Hidraulica e Recursos Hidricos

    1998-12-31

    The present paper reports economical feasibility analysis of small hydroelectric plants based on hydrological studies and on the new concept of flow rate isolines. Electric energy is an essential component of economical integration of the regions in a country. The operation of an isolated electric system do not admit the adequate rearrangement of the energy flux, mainly in the rush time, which takes to deficit situations in some economical sectors, accentuated by generation options that are not totally compatible with the local reality. The paper presents the evolution of the study devoted to obtain financial risks associated to small capacity of electric power generation systems through determination of hydrological risks connected to their working band and installed capacity. (author) 10 refs., 2 figs.

  19. Draft guidelines for an environmental impact assessment small scale hydroelectric plant redevelopment

    International Nuclear Information System (INIS)

    1992-01-01

    A pulp and paper company in St. George, New Brunswick, is proposing to redevelop an existing hydroelectric plant built around 1900. The redevelopment proposal consists of decommissioning the existing powerhouse, constructing a new powerhouse containing a 12-MW Kaplan turbine, excavating a tailrace channel, and installing a new penstock. Other design considerations include improvements to gates in the main dam for improved flood control and modifications to the trash racks to prevent potential fish mortality. The provincial environment ministry has determined that an environmental impact assessment of the potential impacts of the redevelopment was required. Guidelines to be used in the assessment process are presented, including definition of the study boundaries, prediction of environmental effects, description of methods of mitigating and compensating for anticipated impacts, a commitment to monitoring and public consultation, and submittal of terms of reference in response to final assessment guidelines. Requirements for conducting the assessment study and content of the report are also listed. 1 fig

  20. RETRAN-02 analysis of upper head cooling during controlled natural circulation cooldown of Yankee Nuclear Power Station

    International Nuclear Information System (INIS)

    Fujita, N.; Helrich, R.E.; Bergeron, P.A.

    1982-01-01

    RETRAN-02 is particularly well-suited for investigating the fluid conditions in the upper head during a natural circulation cooldown. The RETRAN input model was developed with four basic objectives: (1) accurate description of the upper head cooling mechanisms; (2) proper simulation of natural circulation; (3) respresentations of operator actions required to proceed from full-power to shutdown-cooling-system conditions using both automatic and manual controls; and (4) reduction of the computer cost of simulating this evolution of approximately 10-hour duration. The response of the upper head fluid temperature calculated by RETRAN was in close agreement with measured data obtained from a natural circulation cooldown experiment performed for the Connecticut Yankee Plant, whose design is very similar to the Yankee Nuclear Power Station

  1. Energy optimization through probabilistic annual forecast water release technique for major storage hydroelectric reservoir

    International Nuclear Information System (INIS)

    Abdul Bahari Othman; Mohd Zamri Yusoff

    2006-01-01

    One of the important decisions to be made by the management of hydroelectric power plant associated with major storage reservoir is to determine the best turbine water release decision for the next financial year. The water release decision enables firm energy generated estimation for the coming financial year to be done. This task is usually a simple and straightforward task provided that the amount of turbine water release is known. The more challenging task is to determine the best water release decision that is able to resolve the two conflicting operational objectives which are minimizing the drop of turbine gross head and maximizing upper reserve margin of the reservoir. Most techniques from literature emphasize on utilizing the statistical simulations approach. Markovians models, for example, are a class of statistical model that utilizes the past and the present system states as a basis for predicting the future [1]. This paper illustrates that rigorous solution criterion can be mathematically proven to resolve those two conflicting operational objectives. Thus, best water release decision that maximizes potential energy for the prevailing natural inflow is met. It is shown that the annual water release decision shall be made in such a manner that annual return inflow that has return frequency smaller than critical return frequency (f c ) should not be considered. This criterion enables target turbine gross head to be set to the well-defined elevation. In the other words, upper storage margin of the reservoir shall be made available to capture magnitude of future inflow that has return frequency greater than or equal to f c. A case study is shown to demonstrate practical application of the derived mathematical formulas

  2. 1000kW on-site PAFC power plant development and demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Satomi, Tomohide; Koike, Shunichi [Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA), Osaka (Japan); Ishikawa, Ryou [New Energy and Industrial Technology Development Organization (NEDO), Tokyo (Japan)

    1996-12-31

    Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA) and New Energy and Industrial Technology Development Organization (NEDO) have been conducting a joint project on development of a 5000kW urban energy center type PAFC power plant (pressurized) and a 1000kW on-site PAFC power plant (non-pressurized). The objective of the technical development of 1000kW on-site PAFC power plant is to realize a medium size power plant with an overall efficiency of over 70% and an electrical efficiency of over 36%, that could be installed in a large building as a cogeneration system. The components and system integration development work and the plant design were performed in 1991 and 1992. Manufacturing of the plant and installation at the test site were completed in 1994. PAC test was carried out in 1994, and generation test was started in January 1995. Demonstration test is scheduled for 1995 and 1996.

  3. Implantation aspects of small and medium nuclear power plant in Latin America

    International Nuclear Information System (INIS)

    Brito, S.; Cosentino, J.; Eibenschutz, J.; Gasparian, A.E.; Lepecki, W.P.S.; Spitalnik, J.

    1984-01-01

    The nuclear energy policy adopted by the Latin America is commented. The nuclear power plants in planning are presented. An analysis about the nuclear legislation, licensing and nuclear regulation, quality assurance and formation of human resources for Latin America is done. (E.G.) [pt

  4. Application of multi-model control with fuzzy switching to a micro hydro-electrical power plant

    Energy Technology Data Exchange (ETDEWEB)

    Salhi, Issam; Doubabi, Said [Laboratory of Electric Systems and Telecommunications (LEST), Faculty of Sciences and Technologies of Marrakesh, Cadi Ayyad University, BP 549, Av Abdelkarim Elkhattabi, Gueliz, Marrakesh (Morocco); Essounbouli, Najib; Hamzaoui, Abdelaziz [CReSTIC, Reims University, 9, rue de Quebec B.P. 396, F-10026 Troyes cedex (France)

    2010-09-15

    Modelling hydraulic turbine generating systems is not an easy task because they are non-linear and uncertain where the operating points are time varying. One way to overcome this problem is to use Takagi-Sugeno (TS) models, which offer the possibility to apply some tools from linear control theory, whereas those models are composed of linear models connected by a fuzzy activation function. This paper presents an approach to model and control a micro hydro power plant considered as a non-linear system using TS fuzzy systems. A TS fuzzy system with local models is used to obtain a global model of the studied plant. Then, to combine efficiency and simplicity of design, PI controllers are synthesised for each considered operating point to be used as conclusion of an electrical load TS Fuzzy controller. The latter ensures the global stability and desired performance despite the change of operating point. The proposed approach (model and controller) is tested on a laboratory prototype, where the obtained results show their efficiency and their capability to ensure good performance despite the non-linear nature of the plant. (author)

  5. Taylor Hydro plant goes live

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The 12.75 MW Taylor Hydroelectric Plant in Magrath, Alberta, synchronized its generator with the Alberta Power Grid and began production in April 2000. The plant is located on Government of Alberta irrigation works and is owned by Canadian Hydro Developers. During the irrigation season the plant will generate approximately 40 million kilowatt hours of zero-emission 'green' power for consumption, enough to power 5,000 homes for a year. The Taylor plant is a joint venture with EPCOR Power Development Corporation, a wholly-owned subsidiary of EPCOR Inc., the City of Edmonton utility. Canadian Hydro Developers also owns a 19 MW wind plant and a 6 MW gas plant in Alberta and five other 'run of river' hydro plants in Ontario and British Columbia. The company is committed to the concept of low-impact power generation; its ownership of wind run-of-river hydro and gas-fired facilities is proof of that commitment

  6. Flow-Induced Pulsation and Vibration in Hydroelectric Machinery Engineer’s Guidebook for Planning, Design and Troubleshooting

    CERN Document Server

    Dörfler, Peter; Coutu, André

    2013-01-01

    Since the 1970’s, an increasing amount of specialized research has focused on the problems created by instability of internal flow in hydroelectric power plants. However, progress in this field is hampered by the inter­disciplinary nature of the subject, between fluid mechanics, structural mechanics and hydraulic transients. Flow-induced Pulsation and Vibration in Hydroelectric Machinery provides a compact guidebook explaining the many different underlying physical mechanisms and their possible effects.   Typical phenomena are described to assist in the proper diagnosis of problems and various key strategies for solution are compared and considered with support from practical experience and real-life examples. The link between state-of the-art CFD computation and notorious practical problems is discussed  and quantitative data is provided on  normal levels of vibration and pulsation so realistic limits can be set for future projects. Current projects are also addressed as the possibilities and limitatio...

  7. Environmental impact of coal industry and thermal power plants in India.

    Science.gov (United States)

    Mishra, U C

    2004-01-01

    Coal is the only natural resource and fossil fuel available in abundance in India. Consequently, it is used widely as a thermal energy source and also as fuel for thermal power plants producing electricity. India has about 90,000 MW installed capacity for electricity generation, of which more than 70% is produced by coal-based thermal power plants. Hydro-electricity contributes about 25%, and the remaining is mostly from nuclear power plants (NPPs). The problems associated with the use of coal are low calorific value and very high ash content. The ash content is as high as 55-60%, with an average value of about 35-40%. Further, most of the coal is located in the eastern parts of the country and requires transportation over long distances, mostly by trains, which run on diesel. About 70% oil is imported and is a big drain on India's hard currency. In the foreseeable future, there is no other option likely to be available, as the nuclear power programme envisages installing 20,000 MWe by the year 2020, when it will still be around 5% of the installed capacity. Hence, attempts are being made to reduce the adverse environmental and ecological impact of coal-fired power plants. The installed electricity generating capacity has to increase very rapidly (at present around 8-10% per annum), as India has one of the lowest per capita electricity consumptions. Therefore, the problems for the future are formidable from ecological, radio-ecological and pollution viewpoints. A similar situation exists in many developing countries of the region, including the People's Republic of China, where coal is used extensively. The paper highlights some of these problems with the data generated in the author's laboratory and gives a brief description of the solutions being attempted. The extent of global warming in this century will be determined by how developing countries like India manage their energy generation plans. Some of the recommendations have been implemented for new plants

  8. Six month suspension of Tsuruga nuclear power plant ordered

    International Nuclear Information System (INIS)

    1981-01-01

    This report first describes on brief review of the troubles at Tsuruga Nuclear Power Station. All these accidents or troubles were settled within the Tsuruga Nuclear Power Station, and none was reported either to the Agency of Natural Resources and Energy (ANRE) of Ministry of International Trade and Industry, which is responsible for the supervision of nuclear power plants, or even to the head of Japan Atomic Power Co. (JAPCO). JAPCO criticized itself for the failure to recognize the importance of proper communication. It has been decided that Mr. Suzuki, President of JAPCO, will be succeeded by Mr. Okabe, Managing Director of Tokyo Electric Power Co. It was ordered that the operation of the Tsuruga Nuclear Power Station should be suspended for six months, in accordance with the Reactor Regulation Law, because of the violation of the safety regulations. The final report of ANRE said that ANRE has determined to make maximum efforts to ensure the safety of nuclear power plants, in order to prevent the recurrence of such an accident, and to restore public confidence in nuclear power plants. Nuclear Safety Commission declared that there would be no present or future effect of the radiation leakage on the local people. Local people's organization is lodging complaint against JAPCO. It is expected that the talks between the Ministries of Home Affairs and International Trade and Industry will center on the strengthening of contacts between nuclear power plants and local self-government bodies. (Wakatsuki, Y.)

  9. 50 Years of nuclear power plants in Slovakia

    International Nuclear Information System (INIS)

    Dobak, D.; Moncekova, M.; Pritrsky, R.

    2007-01-01

    The publication was prepared to celebration of semi-centennial anniversary of nuclear power plants in Slovakia and presents a free sequel of book '40 years of nuclear power plants in Slovakia'. It contains memories of the observers that are valuable and merits spreading theirs ideas. There are photos in the publication that up to now were not disclosed and that have a unique value not due to their age only. At the same time, the publication expresses an admiration, regard and acknowledgement to all who joined their life with nuclear power. This book contains the following headings: (1) Speech, Lubomir Jahnatek (Minister of Economy of the Slovak Republic); (2) Speech, Jozef Valach; (3) Speech, Paolo Ruzzini; (4) Historic aspects of A1 NPP; (5) Historic Aspects of V1 NPP; (6) Historic Aspects of V2 NPP; (7) A remembrance to Mochovce; (8) Historic Aspects of VYZ; (9) Nuclear power as an integral part of the Slovak power engineering; (10) Under control of supervision; (12) The state health regulation performance in nuclear installations; (13) JAVYS in the Slovak energy sector

  10. Hydrogen production at hydro-power plants

    Science.gov (United States)

    Tarnay, D. S.

    A tentative design for hydrogen-producing installations at hydropower facilities is discussed from technological, economic and applications viewpoints. The plants would use alternating current to electrolyze purified river water. The hydrogen would be stored in gas or liquid form and oxygen would be sold or vented to the atmosphere. The hydrogen could later be burned in a turbine generator for meeting peak loads, either in closed or open cycle systems. The concept would allow large hydroelectric plants to function in both base- and peak-load modes, thus increasing the hydraulic utilization of the plant and the capacity factor to a projected 0.90. Electrolyzer efficiencies ranging from 0.85-0.90 have been demonstrated. Excess hydrogen can be sold for other purposes or, eventually, as domestic and industrial fuel, at prices competitive with current industrial hydrogen.

  11. Evaluation for turbine implementation for a micro hydroelectric power plant; Avaliacao para implantacao de uma turbina para uma microcentral hidreletrica

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Gilberto Manoel; Halmeman, Maria Cristina Rodrigues; Oliveira, Franciene Gois [Universidade Estadual Paulista (UNESP), Botucatu, SP (Brazil). Programa de Pos-graduacao em Energia na Agricultura; Seraphim, Odivaldo Jose [Universidade Estadual Paulista (UNESP), Botucatu, SP (Brazil). Dep. de Engenharia Rural

    2008-07-01

    In this work it was analyzed the viability technical and economical of turbines to micro hydroelectric headquarters as an alternative to consumers not served by electric energy in isolated areas. It was used a experimental methods to create an estimative and a evaluation of the hydroelectric potential, through hydrological criteria in the area and, thus, be able to note if there is viability for its use. Some kinds of turbines made by the national industry were verified, analyzing the technical and economical characteristics and in function of the hydro energetic-conditions of the area. The results shoed that a micro-headquarters serves the necessities and expectations of the owner at the electric energy supply. It was noted that the expenses are smaller comparing to the other expenses know in the literature, from national factories. Even though the limiting factor is the distance from the production to the consumer, the potency of 18.4 kw was enough to satisfy the local necessities. The installation of de micro headquarters will bring enhances and facilities by the fact that it represents a big social importance for the area. (author)

  12. Churchill Falls (Labrador) Corporation Limited and Twin Falls Power Corporation Limited: Auditor's report and financial statements for the year ended December 31, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Churchill Falls (Labrador) Corp. Ltd. operates a hydroelectric generating plant and related transmission facilities in Labrador with a rated capacity of 5,428 MW. A power contract with Hydro-Quebec provides for the sale of substantially all of the energy from the plant until 2041. The corporation owns a 33.3% equity interest and a 66.7% voting interest in Twin Falls Power Corp., which has an inoperative 225 MW hydroelectric plant on the Unknown River in Labrador. Financial statements for the two corporations are presented for 1992. Total revenues from sales of power by Churchill Falls in 1992 were $87.4 million, and net income for the year was $26.3 million

  13. Are atomic power plants saver than nuclear power plants

    International Nuclear Information System (INIS)

    Roeglin, H.C.

    1977-01-01

    It is rather impossible to establish nuclear power plants against the resistance of the population. To prevail over this resistance, a clarification of the citizens-initiatives motives which led to it will be necessary. This is to say: It is quite impossible for our population to understand what really heappens in nuclear power plants. They cannot identify themselves with nuclear power plants and thus feel very uncomfortable. As the total population feels the same way it is prepared for solidarity with the citizens-initiatives even if they believe in the necessity of nuclear power plants. Only an information-policy making transparent the social-psychological reasons of the population for being against nuclear power plants could be able to prevail over the resistance. More information about the technical procedures is not sufficient at all. (orig.) [de

  14. Proceedings of the topical meeting on nuclear power plant life extension

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    This book contains the proceedings of the topical meeting on nuclear power plant life extension. The sessions are organized under the following headings: Perspectives on nuclear power plant life extension, the potential for additional years of power production, NRC and industry life extension initiatives, concrete and structures degradation and evaluation of useful remaining life, plant life extension programs, Reactor pressure vessel and intervals degradation and evaluation of useful remaining life, life extension decision making issues and institutions, systems degradation and evaluation of remaining life, monitoring and repair, design records and maintenance activities for life extension, Mechanical and electrical component degradation and evaluation of remaining life, expert systems and other techniques for enhanced and continued operation, life extension aspect of codes, standards, and related technologies, piping and valve degradation and evaluation of useful remaining life

  15. Proceedings of a workshop on dealing with uncertainties in the hydroelectric energy business. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-01-01

    This workshop was attended by experts in Canadian and international hydroelectric utilities to exchange information on current practices and opportunities for improvement or future cooperation. The discussions focused on reducing the uncertainties associated with hydroelectric power production. Although significant improvements have been made in the efficiency, reliability and safety of hydroelectric power production, the sector is still challenged by the uncertainty of water supply which depends greatly on weather conditions. Energy markets pose another challenge to power producers in terms of energy supply, energy demand and energy prices. The workshop focused on 3 themes: (1) weather and hydrologic uncertainty, (2) market uncertainty, and (3) decision making models using uncertainty principles surrounding water resource planning and operation. The workshop featured 22 presentations of which 11 have been indexed separately for inclusion in this database. refs., tabs., figs

  16. A contribution to water hammer analysis in pumped-storage power plants; Ein Beitrag zur Druckstossberechnung von Pumpspeicheranlagen

    Energy Technology Data Exchange (ETDEWEB)

    Hoeller, Stefan; Jaberg, Helmut [TU Graz (Austria). Inst. fuer Hydraulische Stroemungsmaschinen

    2013-03-01

    The operation of pumped-storage power plants induces a highly transient fluid flow in the penstock of high head water power plants. In the planning phase a reliable prediction of the transient plant behaviour in unsteady load cases such as e.g. machine start or switching load cases is necessary. Numerical simulation methods provide a tool to calculate the occurring pressure pulsations or mass oscillations as well as for the optimization of the transient behaviour. Commercial software-packages for water hammer simulations usually do not provide numerical models for a realistic calculation of complex components like surge tanks, turbines or emergency closing valves in a high head water power plant. But especially these components need to be modelled correctly in order to get a significant and reliable solution. This article shows the practice ofthe development of a custom-designed numerical model on the example of a pump turbine. (orig.)

  17. Influence of environmental parameters on the concentration of subsurface dissolved methane in two hydroelectric power plants in Brazil

    Science.gov (United States)

    Silva, M. G.; Marani, L.; Alvala, P. C.

    2013-12-01

    Methane (CH4) is a trace gas in the atmosphere of great importance for atmospheric chemistry as one of the main greenhouse gases. There are different sources with the largest individual production associated with the degradation of organic matter submerged in flooded areas. The amount of dissolved methane that reaches the surface depends on the production in the sediments and consumption in the water column. Both processes are associated with microbial activity and consequently dependent on the physico-chemical environmental conditions. The construction of hydroelectric dams cause flooding of areas near the river that can change the characteristics of the environment and cause changes in subsurface methane concentration. In this work, we studied two hydroelectric plants located in Brazil: Batalha (17°20'39.52"S, 47°29'34.29"W), under construction when the samples were take, and Itaipu (25°24'45.00"S, 54°35'39.00"W) which has been floated over 30 years ago. The water samples to determine dissolved methane were collected approximately 5 cm near the surface. In each collection point was measured depth, water temperature, pH and redox potential. The range of dissolved methane between the two dams was similar: 0.07-10.33 μg/l (Batalha) and 0.15-10.93 μg/l (Itaipu). However, the Batalha's average (4.04 × 3.43 μg/l; median = 3.66 μg/l) was higher than that observed in Itaipu (2.15 × 1.59 μg/l; median = 2.53 μg/l). The influence of environmental parameters on the concentration of dissolved methane was evaluated by multivariate statistical techniques (Principal Component Analysis - PCA). All of the parameters had some correlation with dissolved methane, however, the greatest contribution in Batalha was associated with pH while in Itaipu was the depth. The pH variation of the various points studied in Batalha may be associated with periods of drought and flooding of the river and hence the incorporation of organic matter in the environment. The organisms

  18. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  19. Profitability and sustainability of small - medium scale palm biodiesel plant

    Science.gov (United States)

    Solikhah, Maharani Dewi; Kismanto, Agus; Raksodewanto, Agus; Peryoga, Yoga

    2017-06-01

    The mandatory of biodiesel application at 20% blending (B20) has been started since January 2016. It creates huge market for biodiesel industry. To build large-scale biodiesel plant (> 100,000 tons/year) is most favorable for biodiesel producers since it can give lower production cost. This cost becomes a challenge for small - medium scale biodiesel plants. However, current biodiesel plants in Indonesia are located mainly in Java and Sumatra, which then distribute biodiesel around Indonesia so that there is an additional cost for transportation from area to area. This factor becomes an opportunity for the small - medium scale biodiesel plants to compete with the large one. This paper discusses the profitability of small - medium scale biodiesel plants conducted on a capacity of 50 tons/day using CPO and its derivatives. The study was conducted by performing economic analysis between scenarios of biodiesel plant that using raw material of stearin, PFAD, and multi feedstock. Comparison on the feasibility of scenarios was also conducted on the effect of transportation cost and selling price. The economic assessment shows that profitability is highly affected by raw material price so that it is important to secure the source of raw materials and consider a multi-feedstock type for small - medium scale biodiesel plants to become a sustainable plant. It was concluded that the small - medium scale biodiesel plants will be profitable and sustainable if they are connected to palm oil mill, have a captive market, and are located minimally 200 km from other biodiesel plants. The use of multi feedstock could increase IRR from 18.68 % to 56.52 %.

  20. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and a preliminary application document to license its proposed Sutton Hydroelectric Project No. 12693. The project would be located at the U.S. Army Corps of Engineers' (Corps...

  1. Safety assessment and verification for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  2. Safety assessment and verification for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. The present publication is a revision of the IAEA Safety Guide on Management of Nuclear Power Plants for Safe Operation issued in 1984. It supplements Section 2 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation. Nuclear power technology is different from the customary technology of power generation from fossil fuel and by hydroelectric means. One major difference between the management of nuclear power plants and that of conventional generating plants is the emphasis that should be placed on nuclear safety, quality assurance, the management of radioactive waste and radiological protection, and the accompanying national regulatory requirements. This Safety Guide highlights the important elements of effective management in relation to these aspects of safety. The attention to be paid to safety requires that the management recognize that personnel involved in the nuclear power programme should understand, respond effectively to, and continuously search for ways to enhance safety in the light of any additional requirements socially and legally demanded of nuclear energy. This will help to ensure that safety policies that result in the safe operation of nuclear power plants are implemented and that margins of safety are always maintained. The structure of the organization, management standards and administrative controls should be such that there is a high degree of assurance that safety policies and decisions are implemented, safety is continuously enhanced and a strong safety culture is promoted and supported. The objective of this publication is to guide Member States in setting up an operating organization which facilitates the safe operation of nuclear power plants to a high level internationally. The second objective is to provide guidance on the most important organizational elements in order to contribute to a strong safety

  3. Employing modern power plant simulators in nuclear power plants

    International Nuclear Information System (INIS)

    Niedorf, V.; Storm, J.

    2005-01-01

    At the present state of the art, modern power plant simulators are characterized by new qualitative features, thus enabling operators to use them far beyond the traditional field of training. In its first part, this contribution presents an overview of the requirements to be met by simulators for multivalent uses. In part two, a survey of the uses and perspectives of simulation technology in power plants is presented on the basis of experience accumulated by Rheinmetall Defence Electronics (RDE).Modern simulators are shown to have applications by far exceeding traditional training areas. Modular client - sever systems on standard computers allow inexpensive uses to be designed at several levels, thus minimizing maintenance cost. Complex development and running time environments, like the SEMS developed by RDE, have made power plant simulators the workhorses of power plant engineers in all power plant areas. (orig.)

  4. Power generation statistics

    International Nuclear Information System (INIS)

    Kangas, H.

    2001-01-01

    The frost in February increased the power demand in Finland significantly. The total power consumption in Finland during January-February 2001 was about 4% higher than a year before. In January 2001 the average temperature in Finland was only about - 4 deg C, which is nearly 2 degrees higher than in 2000 and about 6 degrees higher than long term average. Power demand in January was slightly less than 7.9 TWh, being about 0.5% less than in 2000. The power consumption in Finland during the past 12 months exceeded 79.3 TWh, which is less than 2% higher than during the previous 12 months. In February 2001 the average temperature was - 10 deg C, which was about 5 degrees lower than in February 2000. Because of this the power consumption in February 2001 increased by 5%. Power consumption in February was 7.5 TWh. The maximum hourly output of power plants in Finland was 13310 MW. Power consumption of Finnish households in February 2001 was about 10% higher than in February 2000, and in industry the increase was nearly zero. The utilization rate in forest industry in February 2001 decreased from the value of February 2000 by 5%, being only about 89%. The power consumption of the past 12 months (Feb. 2000 - Feb. 2001) was 79.6 TWh. Generation of hydroelectric power in Finland during January - February 2001 was 10% higher than a year before. The generation of hydroelectric power in Jan. - Feb. 2001 was nearly 2.7 TWh, corresponding to 17% of the power demand in Finland. The output of hydroelectric power in Finland during the past 12 months was 14.7 TWh. The increase from the previous 12 months was 17% corresponding to over 18% of the power demand in Finland. Wind power generation in Jan. - Feb. 2001 was exceeded slightly 10 GWh, while in 2000 the corresponding output was 20 GWh. The degree of utilization of Finnish nuclear power plants in Jan. - Feb. 2001 was high. The output of these plants was 3.8 TWh, being about 1% less than in Jan. - Feb. 2000. The main cause for the

  5. [Experience in organization of joint actions of expert divisions during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station].

    Science.gov (United States)

    Kolkutin, V V; Ivanov, P L; Fetisov, V A; Afanas'ev, S A; Dorozhkin, O A; Vognerubov, R N; Kuznetsov, T L

    2010-01-01

    The authors illustrate positive experience in organization and coordination of joint actions of expert divisions of different sectors during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station in August 2009. Special emphasis is laid on the participation of experts of quick-reaction teams formed by territorial forensic medical bureaus, mobile and supporting forces from the adjacent regions.

  6. Small hydroelectric engineering practice

    CERN Document Server

    Leyland, Bryan

    2014-01-01

    Small Hydroelectric Engineering Practice is a comprehensive reference book covering all aspects of identifying, building, and operating hydroelectric schemes between 500 kW and 50 MW. In this range of outputs there are many options for all aspects of the scheme and it is very important that the best options are chosen.As small hydroelectric schemes are usually built against a limited budget it is extremely important that the concept design is optimum and every component is designed to maximise the benefi t and minimise the cost. As operating costs are often a high proportion of the income it i

  7. Integration of renewable energies into the German power system and their influence on investments in new power plants. Integrated consideration of effects on power plant investment and operation

    Energy Technology Data Exchange (ETDEWEB)

    Harthan, Ralph Oliver

    2015-01-14

    the integration of renewable energies. It can be further concluded that the share of flexible power plants is higher with the phase-out of nuclear power plants. With regard to the decommissioning dynamics, the phase-out can be considered as beneficial for the economic viability of fossil power plants. Furthermore, the phase-out does not, overall, lead to environmental disadvantages in the medium term, but may be beneficial in the long run since lock-in effects are avoided. Further research is required with regard to the consideration of future flexibility options and a new market design.

  8. Integration of renewable energies into the German power system and their influence on investments in new power plants. Integrated consideration of effects on power plant investment and operation

    International Nuclear Information System (INIS)

    Harthan, Ralph Oliver

    2015-01-01

    the integration of renewable energies. It can be further concluded that the share of flexible power plants is higher with the phase-out of nuclear power plants. With regard to the decommissioning dynamics, the phase-out can be considered as beneficial for the economic viability of fossil power plants. Furthermore, the phase-out does not, overall, lead to environmental disadvantages in the medium term, but may be beneficial in the long run since lock-in effects are avoided. Further research is required with regard to the consideration of future flexibility options and a new market design.

  9. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-12-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations related to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Safety-enhancing plant modifications and general matters relating to the use of nuclear energy are also reported. A summary of the radiation safety of plant personnel and the environment, and tabulated data on the plants' production and their load factors are also given. At the Loviisa 1 plant unit one of two specially-backed AC busbars was lost during the second quarter of 1993. A ca. 30 minute voltage break caused malfunctions in the plant unit's electrical equipment and rendered inoperable certain components important to safety. The event is rated on the International Nuclear Event Scale (INES) at level 1. In inspections carried out at TVO II during the annual maintenance outage, the number of cracks detected in control rod structural material was higher than usual. When cracks occur, part of boron carbide, the power regulating medium in control rods, may wash into the reactor water and control rod shutdown capability may be impaired. The event is rated on the INES at level 1. Other events in the second quarter of 1993 had no bearing on nuclear or radiation safety. (4 figs., 5 tabs.)

  10. Solid Waste from Four-stroke Medium Speed Engine Power Plant Operation

    OpenAIRE

    Smart, Heidi

    2016-01-01

    This thesis is a study of the solid-state waste generated in power plants based on internal combustion engine (ICE) technology, supplied by the Wärtsilä Energy Solutions division. This thesis, which characterizes and quantifies the waste, was done to enhance the ability of supporting customers in issues related to social and environmental impact assessment, environmental permits, waste management planning, etc. The Performance Standards on Environmental and Social Sustainability and the E...

  11. The cross flow turbine (Michell - Banki) as option for small hydroelectric power plants; A turbina de fluxo cruzado (Michell - Banki) como opcao para centrais hidraulicas de pequeno porte

    Energy Technology Data Exchange (ETDEWEB)

    Mello Junior, Antonio Goncalves de

    2000-07-01

    Several types of hydraulic turbines can be used in small hydroelectric power plant, as Pelton, Francis, Turgo, Kaplan, Propeller, Banki, etc. In Brazil the more used are Francis and Kaplan followed by Pelton. The usage of the other types is almost unknown, mainly the Turgo turbine. The cross flow turbine, also known by the names of Michell-Banki, Banki, and Michell-Ossberger is defined as an action turbine that can be applicable to falls from 1 to 200 m and flows from 0,025 to 13 m{sup 3}/s. With the technical evolution mainly in the last two decades by traditional firms like Ossberger Turbinenfabrik and new firms like CINK, that turbine can reach diameters of rotors of 1,0 m with width of 2,6 m and to develop capacity up to 2,000 k W, with efficiency near 90%. The main evolutions are concentrated in modifications presented in the injector of the turbine by several manufacturers, and the use of new materials in the blades of the runner, shafts, bearings and the use of the draft tube. Case study shows the technical and economical implications using a cross flow turbine in comparison to a Francis turbine and a Kaplan. The conclusions will be reported after technical and economical viability analysis among the three types of turbines. (author)

  12. Study of the regional potential for the development of small hydroelectricity - Final report

    International Nuclear Information System (INIS)

    Ruillet, Mathieu; Buchet, Eric

    2005-01-01

    Whereas the potential of small hydroelectric plants in the eastern part of the PACA region, and more generally in the whole region appears to be promising to support energy supply safety, to reduce greenhouse gas emissions, and for local development, this study aimed at making an inventory of existing hydraulic plants (to be renewed or developed for a higher production), of existing weirs to be equipped, and of new sites to be possibly developed (non classified rives, irrigation canals, drinkable water networks). Another objective of this study was to propose a selection among the most promising sites or works. Moreover, the power for these existing or possible installations ranges from 100 kW to 10 MW. After a presentation of the adopted methodology, lists of sites are provided, as well as more detailed presentations of selected sites

  13. Environment and hydroelectricity colloquium - Synthesis

    International Nuclear Information System (INIS)

    Aelbrecht, Denis; Abadie, Marc; Baril, Dominique; Delacoux, Jean-Yves; Delaunay, Alexis; Loudiere, Daniel; Penalba, Anne; Pont, Didier; Rocq, Sylvie; Roult, Didier; Sheibani, Neda; Thevenet, Regis; Weisrock, Ghislain

    2010-10-01

    This document proposes a synthesis of a colloquium dedicated to the interactions between hydroelectric installations and the environment. The four sessions respectively addressed the impacts of hydroelectric installations on ecosystems and more particularly on pisciculture populations (strategies for migration restoration, development of fish-friendly turbines), the sedimentary management of hydroelectric installations, the implementation of the Water Framework European Directive (Austrian experience, biological assessment criteria), and examples of environmental integration of existing or projected installations

  14. Options for the ultimate storage of low and medium level radioactive wastes produced at Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Emeterio, Miguel

    1991-01-01

    The devoted time and still to be expend in prepare, execute and teach permanent and safe solutions to the problem of the evaluation of radioactive wastes reflects the political, economic and environmental importance with respect to public health and safety invested in this task, as well as, its technological challenges. In the case of Laguna Verde nuclear power plant, its low and medium level radioactive wastes are stored in the beginning in a temporal store with a capacity of 2000 m 3 sufficient to four years of normal operation; according to what it is necessary to select one of different ways of waste storage. Different technologies has been evaluated and the preliminary conclusion is that for Mexico the more feasible way to store radioactive wastes is in tumulus (Author)

  15. Survey the of building and dietary structure of local residents around Yangjiang and Hongyanhe nuclear power plants

    International Nuclear Information System (INIS)

    Qian Yekan; Lei Cuiping; Sun Quanfu; Fan Yaohua; Huang Zhibiao; Cui Yong

    2011-01-01

    Objective: To provide a guide in the course of the daily operation and accident emergency response. Methods: The survey was conducted with questionnaires among heads of households collected by stratified radom sampling. The head of a household was asked about residential type and structure, the sources of drinking water, milk, type and frequency of main vegetables. Results: Two-storied and more than two-storied houses were dominant around Yangjiang nuclear power plant, single-storey houses and tile-roofed houses were dominant around Hongyanhe nuclear power plant. The top three of wall construction materials around the two nuclear power plants were orderly brick, stone and beton. Glass window shelters were in the majority. Drinking water of residents was mainly from wells and waterworks. Milk comes from nonlocal packaged products. The top five high frequency vegetables the residents around Yangjiang nuclear power plants eat were orderly cabbage, zucchini, string beans, tong dish, cucumber, and those around Yangjiang nuclear power plant were orderly chinese cabbage, leek, celery, cabbage, spinach. Conclusion: Building and dietary structure around Yangjiang and Hongyanhe nuclear power plants are incongruence. Government can make decisions to collect foods for nuclides monitoring according to building and dietary structure baseline data, and take emergency measures to direct nuclear safety radiation protection for residents when nuclear accident takes place. (authors)

  16. Flood Frequency Analysis Under Non-stationarity Conditions: the Case of Southern Brazilian Hydroelectric Power Plants

    Science.gov (United States)

    Bartiko, Daniel; Chaffe, Pedro; Bonumá, Nadia

    2017-04-01

    Floods may be strongly affected by climate, land-use, land-cover and water infrastructure changes. However, it is common to model this process as stationary. This approach has been questioned, especially when it involves estimate of the frequency and magnitude of extreme events for designing and maintaining hydraulic structures, as those responsible for flood control and dams safety. Brazil is the third largest producer of hydroelectricity in the world and many of the country's dams are located in the Southern Region. So, it seems appropriate to investigate the presence of non-stationarity in the affluence in these plants. In our study, we used historical flood data from the Brazilian National Grid Operator (ONS) to explore trends in annual maxima in river flow of the 38 main rivers flowing to Southern Brazilian reservoirs (records range from 43 to 84 years). In the analysis, we assumed a two-parameter log-normal distribution a linear regression model was applied in order to allow for the mean to vary with time. We computed recurrence reduction factors to characterize changes in the return period of an initially estimated 100 year-flood by a log-normal stationary model. To evaluate whether or not a particular site exhibits positive trend, we only considered data series with linear regression slope coefficients that exhibit significance levels (p<0,05). The significance level was calculated using the one-sided Student's test. The trend model residuals were analyzed using the Anderson-Darling normality test, the Durbin-Watson test for the independence and the Breusch-Pagan test for heteroscedasticity. Our results showed that 22 of the 38 data series analyzed have a significant positive trend. The trends were mainly in three large basins: Iguazu, Uruguay and Paranapanema, which suffered changes in land use and flow regularization in the last years. The calculated return period for the series that presented positive trend varied from 50 to 77 years for a 100 year

  17. Comparison of Gross Greenhouse Gas Fluxes from Hydroelectric Reservoirs in Brazil with Thermopower Generation

    Science.gov (United States)

    Rogerio, J. P.; Dos Santos, M. A.; Matvienko, B.; dos Santos, E.; Rocha, C. H.; Sikar, E.; Junior, A. M.

    2013-05-01

    Widespread interest in human impacts on the Earth has prompted much questioning in fields of concern to the general public. One of these issues is the extent of the impacts on the environment caused by hydro-based power generation, once viewed as a clean energy source. From the early 1990s onwards, papers and studies have been challenging this assumption through claims that hydroelectric dams also emit greenhouse gases, generated by the decomposition of biomass flooded by filling these reservoirs. Like as other freshwater bodies, hydroelectric reservoirs produce gases underwater by biology decomposition of organic matter. Some of these biogenic gases are effective in terms of Global Warming. The decomposition is mainly due by anaerobically regime, emitting methane (CH4), nitrogen (N2) and carbon dioxide (CO2). This paper compare results obtained from gross greenhouse fluxes in Brazilian hydropower reservoirs with thermo power plants using different types of fuels and technology. Measurements were carried in the Manso, Serra da Mesa, Corumbá, Itumbiara, Estreito, Furnas and Peixoto reservoirs, located in Cerrado biome and in Funil reservoir located at Atlantic forest biome with well defined climatologically regimes. Fluxes of carbon dioxide and methane in each of the reservoirs selected, whether through bubbles and/or diffusive exchange between water and atmosphere, were assessed by sampling. The intensity of emissions has a great variability and some environmental factors could be responsible for these variations. Factors that influence the emissions could be the water and air temperature, depth, wind velocity, sunlight, physical and chemical parameters of water, the composition of underwater biomass and the operational regime of the reservoir. Based in this calculations is possible to conclude that the large amount of hydro-power studied is better than thermopower source in terms of atmospheric greenhouse emissions. The comparisons between the reservoirs studied

  18. Fiscal 2000 report on the international joint verification of photovoltaic power generation system. Verification of hybrid system comprising photovoltaic power generation system and micro-hydroelectric power generation systems; 2000 nendo taiyoko hatsuden system kokusai kyodo jissho kaihatsu hokokusho. Taiyoko micro suiryoku hybrid system jissho kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    Research was conducted in Vietnam for the development of a hybrid system comprising a photovoltaic power generation system and a micro-hydroelectric power generation system. In verification test operation, data measurement had been under way for approximately 18 months since it was started in September 1999. The rate of days on which effective data were obtained throughout this period was 93.4%. Power generated by the micro-hydroelectric power generation system was 19.4kWh/d with so small a capacity factor of 3.2%. The capacity factor of the photovoltaic power generation system was again very small at 4.5% since the amount consumed by the load was as small as 131.0kWh/d. Weather data of solar radiation and precipitation were being collected smoothly. In the study of hybrid system optimization, the effect of inductor generator activation upon the inverter was taken up. In the study of capacity balance optimization between the constituent elements of the hybrid system, methodology was established and verified, and calculations were carried out. (NEDO)

  19. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  20. Kansas Power Plants

    Data.gov (United States)

    Kansas Data Access and Support Center — The Kansas Power Plants database depicts, as point features, the locations of the various types of power plant locations in Kansas. The locations of the power plants...