WorldWideScience

Sample records for measures work plan

  1. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  2. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  3. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    Science.gov (United States)

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  4. Interim Measures Work Plan Expanded Bioventing System SWMU 55 (IRP Site FT-03)

    National Research Council Canada - National Science Library

    1997-01-01

    This interim measures work plan (IMWP) presents the scope for an expanded bioventing system to conduct in situ treatment of the remaining fuel-contaminated soils at solid waste management unit (SWMU...

  5. Interim Corrective Measures Work Plan for the Expanded Bioventing System Eglin Main Base Old Fire Training Area

    National Research Council Canada - National Science Library

    1997-01-01

    This interim corrective measures work plan (ICM work plan) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at the Eglin Main Base Old Fire Training Area (old Eglin FTA...

  6. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    Science.gov (United States)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  7. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    Science.gov (United States)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  8. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  9. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  10. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    MCCARTHY, M.M.

    1999-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  11. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  12. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  13. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  14. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  15. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  16. Work hazard prevention plans

    International Nuclear Information System (INIS)

    Albertos Campos, F.

    2009-01-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  17. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    International Nuclear Information System (INIS)

    ROGERS, P.M.

    2000-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted

  18. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  19. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  20. Enhanced radiological work planning; TOPICAL

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  1. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  2. Radiological Work Planning and Procedures

    CERN Document Server

    Kurtz, J E

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

  3. TWRS Systems Engineering Working Plan

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1994-01-01

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations

  4. PUREX facility preclosure work plan

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D)

  5. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    INTRODUCTION: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer...... trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  6. Measuring innovative work behaviour

    NARCIS (Netherlands)

    de Jong, J.; den Hartog, D.

    2010-01-01

    Both scientists and practitioners emphasize the importance of innovative work behaviour (IWB) of individual employees for organizational success, but the measurement of IWB is still at an evolutionary stage. This article is concerned with developed a measure of IWB with four potential dimensions:

  7. Radiological Work Planning and Procedures

    International Nuclear Information System (INIS)

    KURTZ, J.E.

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD

  8. Current status of work on preservation of accumulated knowledge on fast reactors in Russia and plan of top-priority measures

    International Nuclear Information System (INIS)

    Kotchetkov, L.A.; Poplavsky, V.M.; Tsiboulya, A.M.; Ashurko, Yu.M.

    2005-01-01

    The future of nuclear power is associated with mastering of fast reactor technology. Experience gained in Russia by now in the development of sodium cooled fast reactors (FR) and reactor plants of various applications is one of the most extensive and successful all over the world. Since the late 1940-ies up to now, well-directed, rather intensive work has been carried out in the USSR (later in Russia) on all aspects of fast reactors. Institute for Physics and Power Engineering has been always leading organization in the USSR and in Russia in the area of fast reactors. Work on fast reactors in Russia was carried out by many institutions, namely: IPPE, VNIINM, OKBM, VNIPIET, OKB Gidropress, RIAR, SPbAEP, TsNII Prometey and teams of the BN-350 and the BN-600 plants working in close and fruitful cooperation. Successful operation of the power unit of Beloyarskaya NPP with the BN-600 fast reactor during 25 years is one of the good results of this vast expensive efforts. In view of delay in wide-scale deployment of fast neutron reactors and change of generations of specialists in the area of FR, a necessity has arisen in the preservation of knowledge and experience on FR gained in many countries including Russia. Certain measures in this area have been planned by the Russian organizations. However, the necessity has become imminent in a purposeful systematized approach to the preservation of knowledge in fast reactor area, which can be realized only within the framework of development of appropriate special work program. The basic work trends within the framework of this program have been stated. In view of urgency of some part of this work, it is necessary to prioritize the work contents. IAEA assistance (methodological, organizational and financial) in the implementation of some sections of the program would facilitate successful implementation of the work program on preservation of knowledge on FR in Russia. (author)

  9. A Marketing Plan That Works

    Science.gov (United States)

    Sparks, Jack D.

    1976-01-01

    Olivet College's marketing plan included survey of students, alumni, townspeople, and doners and analysis of the college's customer appeal, prices, and product mix. The author reports that the marketing objectives are being met and discusses the rationale and problems of applying business marketing principles to education. (JT)

  10. Behavior Plan, Does It Work?

    Science.gov (United States)

    Gonzalez, Blanca M.; Brown, D.

    2015-01-01

    As educators, we are responsible for teaching academic skills. However, some students not only need to learn academic skills but they need behavior support, due to problematic behaviors that are happening in the school setting. In this article, we will learn more of what are the implications, requirements and best strategies for a behavior plan.…

  11. Drawing plan for solid works

    International Nuclear Information System (INIS)

    Lee, Kuk Hwan; Kim, Hyung Seop; Yu, Dae Won

    2004-02-01

    This book deals with beginning solid works 2003, setting system option, setting tool group, setting document and storing part template file. It also introduces works of basic solid works modeling such as making of square, circuit, plate washer, square column, block I, block II, link, cover plate, position block and housing. The last part explains drawing of fix block, stopper plate III, bracket, cover, belt pulley, circle plate, square, block, stopper block, angle block, washer, circle block and link.878

  12. Working memory and planning during sentence production.

    Science.gov (United States)

    Martin, Randi C; Yan, Hao; Schnur, Tatiana T

    2014-10-01

    Speakers retrieve conceptual, syntactic and lexical information in advance of articulation during sentence production. What type of working memory (WM) store is used to hold the planned information before speaking? To address this question, we measured onset latencies when subjects produced sentences that began with either a complex or a simple initial noun phrase, while holding semantic, phonological or spatial information in WM. Although we found that subjects had longer onset latencies for sentences beginning with a complex noun phrase, showing a phrasal scope of planning, the magnitude of this complexity effect was not affected by any type of WM load. However, subjects made more syntactic errors (but not lexical errors) for sentences beginning with a complex noun phrase, suggesting that advance planning for these phrases occurs at a syntactic rather than lexical-semantic level, which may account for the lack of effect with various types of WM load in the current study. Copyright © 2014 Elsevier B.V. All rights reserved.

  13. Working plan BDG 91/92

    International Nuclear Information System (INIS)

    1991-09-01

    This report describes the investigative work planned at the potential location Bois de la Glaive, one of four possible locations for a waste disposal site for short-lived low and intermediate-level radioactive waste in Switzerland. This document replaces the 'plan d'execution BDG 89' dated October 1989, which lists the work which Nagra intends to carry out according to the preparatory work in accordance with Article 15 of the Bundesgesetz (Federal Law) regarding compulsory expropriation. This action was unfortunately necessary owing to the intense local opposition to the project. Owing to this opposition it was only possible to carry out field tests for the geophysical work and the plaster capped drill holes at the Bois de la Glaive as well as the hydrological cadastre. Thanks to a recommendation by the local authority and an amicable arrangement with the private owners at most of the observation points, it was possible to start periodic inspection measurements within the framework of the hydrogeological tests from March 1991. The aim of the tests described in this document is to obtain primary geological knowledge, as well as, where applicable, identify possible disqualifying criteria for the potential location at Bois de la Glaive. The different geological and hydrogeological tests are presented following an introduction which refers to the geological, historical and legal problems. It is intended to carry out these tests in 1991/92 possibly extending over into the first quarter 1993. Thus the necessary level of information should be achieved for this location. (author) figs., tabs., 14 refs

  14. Mobile Launch Platform Vehicle Assembly Building Area (SWMU 056) Hot Spot 3 Bioremediation Interim Measures Work Plan, Kennedy Space Center, Florida

    Science.gov (United States)

    Whitney L. Morrison; Daprato, Rebecca C.

    2016-01-01

    This Interim Measures Work Plan (IMWP) presents an approach and design for the remediation of chlorinated volatile organic compound (CVOC) groundwater impacts using bioremediation (biostimulation and bioaugmentation) in Hot Spot 3, which is defined by the area where CVOC (trichloroethene [TCE], cis-1,2-dichloroethene [cDCE], and vinyl chloride [VC]) concentrations are greater than 10 times their respective Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentration (NADC) [10xNADC] near the western Mobile Launch Platform (MLP) structure. The IM treatment area is the Hot Spot 3 area, which is approximately 0.07 acres and extends from approximately 6 to 22 and 41 to 55 feet below land surface (ft BLS). Within Hot Spot 3, a source zone (SZ; area with TCE concentrations greater than 1% solubility [11,000 micrograms per liter (micrograms/L)]) was delineated and is approximately 0.02 acres and extends from approximately 6 to 16 and 41 to 50 ft BLS.

  15. [Some psychological problems in family planning work].

    Science.gov (United States)

    Chen, J

    1983-11-29

    Psychology has significance in family planning work, because it may promote the scientific nature of family planning work and thus increase its effectiveness. Since people have some common aspects in their psychological process, family planning workers should master some common rules of the people's psychological process in order to understand psychological trends and possible behavior. Through this method, family planning workers may find how to adjust to problems they may encounter in their daily work, such as the worries about a single child being too lonely, spoiled, and hard to handle for the parents, the traditional belief that more children represent good fortune, and more male children may provide security for one's old age. Traditionally, the Chinese people believed that only male children can carry on the family line and that more children will provide a larger labor force, which is beneficial to a family's financial situation. In family planning work, all such incorrect ways of thinking should be corrected and revised. Studies of children's psychology should also be developed so that children may develop a healthy mentality. All these are crucial to the success of family planning work and the promotion of population quality.

  16. Individualism-Collectivism: Links to Occupational Plans and Work Values

    Science.gov (United States)

    Hartung, Paul J.; Fouad, Nadya A.; Leong, Frederick T. L.; Hardin, Erin E.

    2010-01-01

    Individualism-collectivism (IC) constitutes a cultural variable thought to influence a wide variety of variables including career planning and decision making. To examine this possibility, college students (216 women, 106 men, 64% racial-ethnic minorities) responded to measures of IC, occupational plans, and work values. Multivariate analysis of…

  17. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...... indicates that a measurable reduction of repetitive work has been achieved, while recognizing the the new management strategies focusing on human resources development have also played an important role. These results are used to suggest that - under certain conditions - a combination of state regulation...... and industrial relation agreements can be used to regulate other working environment problems....

  18. Planned Parenthood works with Korean government.

    Science.gov (United States)

    Yang, J M

    1968-01-01

    In early 1961 special representatives of the International Planned Parenthood Federation (IPPF) organized the Planned Parenthood Federation of Korea (PPFK). The leaders, mostly young university professors, physicians, and government officials well recognized in the fields of public health gynecology/obstetrics, pediatrics, nursing, sociology, social work, and economics, shared an interest in improving the national economy, the national welfare, countermeasures against the population crisis, and the urgent need for family planning services in Korea. The leadership of General Park Chung-hee led to adoption of a national policy in support of family planning at an early stage in November 1961. Since 1961, the government budget for family planning has doubled every year. The PPFK was asked to play a major role in planning, administration, training, information, and education of the national program until the government established the new section of Maternal and Child Health in the Ministry of Health and Social Affairs in 1963. The role of the PPFK has never diminished. The training of family planning personnel at various levels is still carried out entirely by the PPFK. The PPFK operates mobile vans to provide educational activities, IUD insertions, and male sterilization services to people in villages without doctors. The PPFK operates pilot projects to test new methods either in clinics or in the field. The PPFK exists to supplement and cooperate with the government in family planning. With its flexibility, the PPFK team of experts stands ready to provide quick and positive services without red tape.

  19. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  20. 40 CFR 35.107 - Work plans.

    Science.gov (United States)

    2010-07-01

    ... and evaluation of performance under the grant agreement. (2) An approvable work plan must specify: (i... and a time frame for their accomplishment; (iv) A performance evaluation process and reporting... environmental program grant if the portions of the Performance Partnership Agreement that serve as all or part...

  1. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  2. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  3. Production, staff, working time and financial planning

    Directory of Open Access Journals (Sweden)

    Orlando Boiteux

    2009-07-01

    Full Text Available Aggregate planning can be a tool for coordinating the tactical decisions belonging to some functional areas of a company. This potential has been limited due to methodological and technical reasons, but nowadays it is possible to solve very sophisticated models integrating, with a high level of detail, a great number of decisions of several functional areas and that permit to include new management schemes. In this paper, a production, staff, working time and cash management model is introduced.

  4. Integrating ALARA into work planning and organization

    International Nuclear Information System (INIS)

    Croft, J.R.; Robb, J.D.

    1993-01-01

    This paper presents various organizational structures and systematic approaches that can be of benefit in integrating ALARA into work planning and organization. It is possible to have elegant policy statements, procedures and organizations and yet fail to implement ALARA effectively. The real key to success in ALARA work management is to recognize that ALARA is primarily a way of thinking and to secure the commitment of individuals at all levels within the organization, from senior management to workers carrying out specific tasks. The authors explain that the recommendations of ICRP Publication 60 will have an impact and will maintain the downward pressure on individual doses. 6 figs

  5. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  6. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  7. Participatory planning intercultural: Reflections for social work

    Directory of Open Access Journals (Sweden)

    Esperanza Gómez Hernández

    2012-01-01

    Full Text Available Since the nineties, participatory planning has emerged as a linking strategy for various social, political, economic and cultural sectors that assessed it as a potential for building consensus in the making of local processes forsocial improvement. Similarly, it was legitimized as a setting for practice for professionals trained in the social sciences, mainly Social Work. This article, from a geopolitical and geo-cultural perspective, presents contextual elements that determined the configuration of participatory planning in Latin America. These elements shall be staged in order to redefine diversity and the intercultural perspective that has been linked to this mobilizing strategy, against the institutionalized discourse of development and for the emergence of crisis and ruptures with this social paradigm from other practices and worldviews of life in the territories.

  8. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  9. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  10. Health Plan Performance Measurement within Medicare Subvention.

    Science.gov (United States)

    1998-06-01

    the causes of poor performance (Siren & Laffel, 1996). Although outcomes measures such as nosocomial infection rates, admission rates for select...defined. Traditional outcomes measures include infection rates, morbidity, and mortality. The problem with these traditional measures is... Maternal /Child Care Indicators Nursing Staffing Indicators Outcome Indicators Technical Outcomes Plan Performance Stability of Health Plan

  11. Measuring resilience in integrated planning

    DEFF Research Database (Denmark)

    Apneseth, K.; Wahl, A. M.; Hollnagel, E.

    2013-01-01

    This chapter demonstrates how a Resilience Analysis Grid (RAG) can be used to profile the performance of a company in terms of the four abilities that characterize a resilient organization. It describes the development of a new, RAG-based tool founded on Resilience Engineering principles that can...... be used to assess an organization's resilience. The tool was tested in a case study involving a company in the offshore oil and gas industry. The company had decided to adopt an Integrated Operations (IO) approach to operations and maintenance planning and the tool was used to evaluate the impact...... of the Integrated Planning (IPL) process on its resilience....

  12. Environmental Measurements Laboratory 2002 Unit Performance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-10-01

    This EML Unit Performance Plan provides the key goals and performance measures for FY 2002 and continuing to FY 2003. The purpose of the Plan is to inform EML's stakeholders and customers of the Laboratory's products and services, and its accomplishments and future challenges. Also incorporated in the Unit Performance Plan is EML's Communication Plan for FY 2002.

  13. Training Planning and Working Memory in Third Graders

    Science.gov (United States)

    Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano

    2013-01-01

    Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…

  14. Reflexive Planning as Design and Work

    DEFF Research Database (Denmark)

    Lissandrello, Enza; Grin, John

    2011-01-01

    in planning emerges as a new tool for generating critical knowledge and dialogue that can synthesise the perspectives of multiple actors in a common understanding, existing structural constraints and a collective imagination of alternative future possibilities. Such research highlights the potential......In recent years, planning theorists have advanced various interpretations of the notion of reflexivity, inspired by American pragmatism, complexity theory, hermeneutics, discursive and collaborative planning. Scholars agree that “reflexivity” has a strong temporal dimension: it not only aims...... to solve present planning problems, but to imagine and understand alternative trajectories for future action. This article explores the practical utility of reflexivity for planners, through a case study that focuses on a project to promote sustainable development in the Port of Amsterdam. Reflexivity...

  15. Atmospheric Radiation Measurement Program plan

    International Nuclear Information System (INIS)

    1990-02-01

    In order to understand energy's role in anthropogenic global climate change, significant reliance is being placed on General Circulation Models (GCMs). A major goal is to foster the development of GCMs capable of predicting the timing and magnitude of greenhouse gas-induced global warming and the regional effects of such warming. The Atmospheric Radiation Measurement (ARM) Program will contribute to the Department of Energy goal by improving the treatment of cloud radiative forcing and feedbacks in GCMs. Two issues will be addressed: the radiation budget and its spectral dependence and the radiative and other properties of clouds. The experimental objective of the ARM Program is to characterize empirically the radiative processes in the Earth's atmosphere with improved resolution and accuracy. A key to this characterization is the effective treatment of cloud formation and cloud properties in GCMs. Through this characterization of radiative properties, it will be possible to understand both the forcing and feedback effects. 19 refs., 4 figs., 2 tabs

  16. Planning that works: Empowerment through stakeholder focused interactive planning (SFIP)

    International Nuclear Information System (INIS)

    Beck, J.E.; Ison, S.A.

    1994-01-01

    This paper describes a powerful planning tool that can enable government, private industries, and public interest organizations to actualize their visions through sound decision making. The stakeholder focused interactive planning model is designed to integrate and ultimately gain stakeholder investment in the success of attainment of their vision. The only concessions required of the planning organization using this process is the acceptance of the premise that sustained vision success requires the support of both internal and external stakeholders and that each step in the process must be used as a validation of the previous step and essential to the completion of the next step. What is stakeholder/public involvement? It is the process in which the stakeholders (both internal and external) values, interests and expectations are included in decision-making processes. The primary goal of public involvement efforts is to include all those who have a stake in the decision, whether or not they have already been identified. Stakeholders are individuals, contractors, clients, suppliers, public organizations, state and local governments, Indian tribes, federal agencies, and other parties affected by decisions

  17. Migration plans and hours of work in Malaysia.

    Science.gov (United States)

    Gillin, E D; Sumner, D A

    1985-01-01

    "This article describes characteristics of prospective migrants in the Malaysian Family Life Survey and investigates how planning to move affects hours of work. [The authors] use ideas about intertemporal substitution...to discuss the response to temporary and permanent wage expectations on the part of potential migrants. [An] econometric section presents reduced-form estimates for wage rates and planned migration equations and two-stage least squares estimates for hours of work. Men currently planning a move were found to work fewer hours. Those originally planning only a temporary stay at their current location work more hours." excerpt

  18. Atmospheric Radiation Measurement Program Plan

    International Nuclear Information System (INIS)

    1990-02-01

    In order to understand energy's role in anthropogenic global climate change, significant reliance is being placed on General Circulation Models (GCMs). A major goal of the Department is to foster the development of GCMs capable of predicting the timing and magnitude of greenhouse gas-induced global warming and the regional effects of such warming. DOE research has revealed that cloud radiative feedback is the single most important effect determining the magnitude of possible climate responses to human activity. However, cloud radiative forcing and feedbacks are not understood at the levels needed for reliable climate prediction. The Atmospheric Radiation Measurement (ARM) Program will contribute to the DOE goal by improving the treatment of cloud radiative forcing and feedbacks in GCMs. Two issues will be addressed: the radiation budget and its spectral dependence and the radiative and other properties of clouds. Understanding cloud properties and how to predict them is critical because cloud properties may very well change as climate changes. The experimental objective of the ARM Program is to characterize empirically the radiative processes in the Earth's atmosphere with improved resolution and accuracy. A key to this characterization is the effective treatment of cloud formation and cloud properties in GCMs. Through this characterization of radiative properties, it will be possible to understand both the forcing and feedback effects. GCM modelers will then be able to better identify the best approaches to improved parameterizations of radiative transfer effects. This is expected to greatly improve the accuracy of long-term, GCM predictions and the efficacy of those predictions at the important regional scale, as the research community and DOE attempt to understand the effects of greenhouse gas emissions on the Earth's climate. 153 refs., 24 figs., 6 tabs

  19. Optimal motion planning using navigation measure

    Science.gov (United States)

    Vaidya, Umesh

    2018-05-01

    We introduce navigation measure as a new tool to solve the motion planning problem in the presence of static obstacles. Existence of navigation measure guarantees collision-free convergence at the final destination set beginning with almost every initial condition with respect to the Lebesgue measure. Navigation measure can be viewed as a dual to the navigation function. While the navigation function has its minimum at the final destination set and peaks at the obstacle set, navigation measure takes the maximum value at the destination set and is zero at the obstacle set. A linear programming formalism is proposed for the construction of navigation measure. Set-oriented numerical methods are utilised to obtain finite dimensional approximation of this navigation measure. Application of the proposed navigation measure-based theoretical and computational framework is demonstrated for a motion planning problem in a complex fluid flow.

  20. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  1. Work hazard prevention plans; Plan de prevencion de riesgos laborales

    Energy Technology Data Exchange (ETDEWEB)

    Albertos Campos, F.

    2009-07-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  2. Work-Family Planning Attitudes among Emerging Adults

    Science.gov (United States)

    Basuil, Dynah A.; Casper, Wendy J.

    2012-01-01

    Using social learning theory as a framework, we explore two sets of antecedents to work and family role planning attitudes among emerging adults: their work-family balance self-efficacy and their perceptions of their parents' work-to-family conflict. A total of 187 college students completed a questionnaire concerning their work-family balance…

  3. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  4. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  5. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  6. Office of Inspector General fiscal year 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  7. The International Space Life Sciences Strategic Planning Working Group

    Science.gov (United States)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  8. Quadrant I RCRA Facility Investigation Work Plan

    International Nuclear Information System (INIS)

    1990-01-01

    The objective of this Facility Investigation (FRI) at the Portsmouth Gaseous Diffusion Plant (PORTS) is to acquire, analyze and interpret data which will: (1) characterize the environmental setting including ground water, surface water and sediment, soil and air; (2) define and characterize sources of contamination; (3) characterize the vertical and horizontal extent and degree of contamination of the environment; (4) assess the risk to human health and the environment resulting from possible exposure to contaminants; and, (5) support the Corrective Measures Study (CMS) which will follow the RFI. Investigations to characterize the environmental setting, sources of contamination, and vertical and horizontal extent and degree of contamination will be conducted relative to individual potential sources which have been identified in the Quadrant I Description of Current Conditions. These unit investigations will follow the systematic approach which is outlined below

  9. Synthesis of work-zone performance measures.

    Science.gov (United States)

    2013-09-01

    The main objective of this synthesis was to identify and summarize how agencies collect, analyze, and report different work-zone : traffic-performance measures, which include exposure, mobility, and safety measures. The researchers also examined comm...

  10. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  11. WIPP Facility Work Plan for Solid Waste Management Units

    International Nuclear Information System (INIS)

    2000-01-01

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A

  12. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  13. NPP accident scenario. Which emergency measures are planned in Switzerland?

    International Nuclear Information System (INIS)

    Flury, Christoph

    2016-01-01

    As a consequence of the reactor accident in Fukushima the Swiss government has ordered an extensive analysis of emergency planning in case of a NPP accident Switzerland. A special working group has analyzed the possible improvements of Swiss emergency planning based on the experiences in Japan. Under the special direction of the Bundesamt fuer Bevoelkerungsschutz (BABS) the agreed improvements were integrated into the emergency concept. The reference scenarios have been re-assessed and the zone concept adapted. The emergency measures include shelter-type rooms (basement or window-less rooms), the preventive distribution of iodine pills, measures concerning agriculture, aquatic systems, preventive evacuation, traffic regulations, and delayed evacuation.

  14. Dose exposure work planning using DMU kinematics tools

    International Nuclear Information System (INIS)

    Rosli Darmawan

    2010-01-01

    The study on the possibility of using DMU Kinematics module in CAE tools for dose exposure work planning was carried out. A case scenario was created using 3D CAD software and transferred to DMU Kinematics module in CAE software. A work plan was created using DMU Kinematics tools and animated to simulate a real time scenario. Data on the phantom position against the radioactive source was collected by activating positioning sensors in the module. The data was used to estimate dose rate exposure for the phantom. The results can be used to plan the safest and optimum procedures in carrying out the radiation related task. (author)

  15. Applying Planning Algorithms to Argue in Cooperative Work

    Science.gov (United States)

    Monteserin, Ariel; Schiaffino, Silvia; Amandi, Analía

    Negotiation is typically utilized in cooperative work scenarios for solving conflicts. Anticipating possible arguments in this negotiation step represents a key factor since we can take decisions about our participation in the cooperation process. In this context, we present a novel application of planning algorithms for argument generation, where the actions of a plan represent the arguments that a person might use during the argumentation process. In this way, we can plan how to persuade the other participants in cooperative work for reaching an expected agreement in terms of our interests. This approach allows us to take advantages since we can test anticipated argumentative solutions in advance.

  16. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  17. Technical Work Plan for: Thermodynamic Databases for Chemical Modeling

    International Nuclear Information System (INIS)

    C.F. Jovecolon

    2006-01-01

    The objective of the work scope covered by this Technical Work Plan (TWP) is to correct and improve the Yucca Mountain Project (YMP) thermodynamic databases, to update their documentation, and to ensure reasonable consistency among them. In addition, the work scope will continue to generate database revisions, which are organized and named so as to be transparent to internal and external users and reviewers. Regarding consistency among databases, it is noted that aqueous speciation and mineral solubility data for a given system may differ according to how solubility was determined, and the method used for subsequent retrieval of thermodynamic parameter values from measured data. Of particular concern are the details of the determination of ''infinite dilution'' constants, which involve the use of specific methods for activity coefficient corrections. That is, equilibrium constants developed for a given system for one set of conditions may not be consistent with constants developed for other conditions, depending on the species considered in the chemical reactions and the methods used in the reported studies. Hence, there will be some differences (for example in log K values) between the Pitzer and ''B-dot'' database parameters for the same reactions or species

  18. Student Centric Learning Through Planned Hard work - An Innovative Model

    OpenAIRE

    Aithal, Sreeramana; Aithal, Shubrajyotsna

    2016-01-01

    The strategies followed by educational institutions and the students become very important when the performance of students in the examinations is concerned. By means of properly planned and well guided model of training and motivation to do hard work, students can follow a well disciplined study plan and become exceptionally successful in examinations. Teaching and training by experienced and dedicated faculty members, continuous support by parents and motivating the students based on settin...

  19. Work zone performance measures pilot test.

    Science.gov (United States)

    2011-04-01

    Currently, a well-defined and validated set of metrics to use in monitoring work zone performance do not : exist. This pilot test was conducted to assist state DOTs in identifying what work zone performance : measures can and should be targeted, what...

  20. Planning of optimal work path for minimizing exposure dose during radiation work in radwaste storage

    International Nuclear Information System (INIS)

    Kim, Yoon Hyuk; Park, Won Man; Kim, Kyung Soo; Whang, Joo Ho

    2005-01-01

    Since the safety of nuclear power plant has been becoming a big social issue, the exposure dose of radiation for workers has been one of the important factors concerning the safety problem. The existing calculation methods of radiation dose used in the planning of radiation work assume that dose rate dose not depend on the location within a work space, thus the variation of exposure dose by different work path is not considered. In this study, a modified numerical method was presented to estimate the exposure dose during radiation work in radwaste storage considering the effects of the distance between a worker and sources. And a new numerical algorithm was suggested to search the optimal work path minimizing the exposure dose in pre-defined work space with given radiation sources. Finally, a virtual work simulation program was developed to visualize the exposure dose of radiation during radiation works in radwaste storage and provide the capability of simulation for work planning. As a numerical example, a test radiation work was simulated under given space and two radiation sources, and the suggested optimal work path was compared with three predefined work paths. The optimal work path obtained in the study could reduce the exposure dose for the given test work. Based on the results, the developed numerical method and simulation program could be useful tools in the planning of radiation work

  1. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  2. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  3. Technical Support Section annual work plan for FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1997-12-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.

  4. Work-in-process clearing in supply chain operations planning

    NARCIS (Netherlands)

    Selcuk, B.; Fransoo, J.C.; Kok, de A.G.

    2008-01-01

    In this study we provide insights into the effectiveness of the clearing function concept in a hierarchical planning context. The clearing function is a mathematical representation of the relation between the Work-In-Process (WIP) and the throughput of a production process. We use it in a

  5. Work Plans 2011 – Norwegian Scientific Committee for Food Safety

    OpenAIRE

    Norwegian Scientific Committee for Food Safety

    2011-01-01

    The annual work plan for 2011 summaries activities for the Scientific Steering Committee and the 9 panels of the Norwegian Scientific Committee for Food Safety (VKM). VKM carries out independent risk assessments for the Norwegian Food Safety Authority across the Authority’s field of responsibility as well as environmental risk assessments of genetically modified organisms for the Directorate for Nature Management.

  6. Tank waste remediation system multi-year work plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders

  7. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  8. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  9. Process development work plan for waste feed delivery system

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis

  10. Measuring Working Memory Deficits in Aphasia

    Science.gov (United States)

    Mayer, Jamie F.; Murray, Laura L.

    2012-01-01

    Purpose: Many adults with aphasia demonstrate concomitant deficits in working memory (WM), but such deficits are difficult to quantify because of a lack of validated measures as well as the complex interdependence between language and WM. We examined the feasibility, reliability, and internal consistency of an "n"-back task for…

  11. Technical Work Plan for: Fracture and Lithophysal Studies

    Energy Technology Data Exchange (ETDEWEB)

    n

    2006-09-11

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models.

  12. Technical Work Plan for: Fracture and Lithophysal Studies

    International Nuclear Information System (INIS)

    2006-01-01

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models

  13. Half-liter supernatant sampler system engineering work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial Pretreatment Module (IPM), requires samples of supernatants and sludges from 200 Area tank farms for planned hot testing work in support of IPM design. The IPM project has proposed the development of several new sampler systems. These systems include a 0.5-l supernatant sampler, 3-l and 25-l supernatant and sludge samplers, and a 4,000-l sampler system. The 0.5-l sampler will support IPM sampling needs in the 1 to 3 l range starting in late fiscal year 1995. This sampler is intended to be used in conjunction with the existing 100 ml bottle-on-a-string. The 3-l and 25-l systems will be based on the Savannah River Site's sampler system and will support IPM sampling needs in the 3 to 100 liter range. Most of the hot testing required for design of the IPM must be accomplished in the next 3 years. This work plan defines the tasks associated with the development of a 0.5-l sampler system. This system will be referred to as the Half-Liter Supernatant Sampler System (HLSSS). Specifically, this work plan will define the scope of work, identify organizational responsibilities, identify major technical requirements, describe configuration control and verification requirements, and provide estimated costs and schedule. The sampler system will be fully operational, including trained staff and operating procedures, upon completion of this task

  14. Learners’ processes during pre-task planning and Working Memory Capacity

    Directory of Open Access Journals (Sweden)

    Maria da Gloria Tavares

    2016-01-01

    Full Text Available http://dx.doi.org/10.5007/2175-8026.2016v69n1p79 The present study is part of a larger scale research (Guará-Tavares, 2011, 2013 that investigates the relationship among working memory capacity, pre-task planning, and L2 speech performance. The aim of the study was to analyze 1 what processes learners engage during pre-task planning, and 2 whether higher and lower working memory spans engage in different processes during pre-task planning. Learners’ processes were accessed by means of think aloud protocols and a retrospective interview. Working memory capacity was measured by the Speaking Span Test. Results show that learners engage mainly in organization of ideas, rehearsal, lexical searches, and monitoring.. Moreover, higher spans employ significantly more metacognitive strategies during planning when compared to lower spans.

  15. Planning and Evaluating Educational Work in Slovene Preschools

    Directory of Open Access Journals (Sweden)

    Marcela Batistič Zorec

    2012-01-01

    Full Text Available The present article examines the changes in Slovene preschools subsequent to Slovenia’s independence in 1991. In the socialist period, the national education programme for preschools was highly structured, goaland content-oriented and subject to schoolization. The Curriculum for Preschools (1999 brought conceptual changes towards education “based on the child” and the process approach, as well as giving more autonomy to preschool teachers and their assistants. In the empirical study, we examine changes in planning and evaluating educational work compared to the past. The results show that the majority of professional workers have reduced the high level of structure and rigidity in planning, and that there is better cooperation between preschool teachers and teachers’ assistants. Unlike in the past, most professional workers regularly evaluate their educational work. As the data was gathered in two phases, before and after the training of professional workers in the Reggio Emilia concept, we also search for the (probably indirect influencesof this training. We conclude that after the training the participation of children in planning and evaluating educational work is higher.

  16. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  17. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    International Nuclear Information System (INIS)

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  18. Work required for selective quantum measurement

    Science.gov (United States)

    Konishi, Eiji

    2018-06-01

    In quantum mechanics, we define the measuring system M in a selective measurement by two conditions. Firstly, when we define the measured system S as the system in which the non-selective measurement part acts, M is independent from the measured system S as a quantum system in the sense that any time-dependent process in the total system S  +  M is divisible into parts for S and M. Secondly, when we can separate S and M from each other without changing the unitary equivalence class of the state of S from that obtained by the partial trace of M, the eigenstate selection in the selective measurement cannot be realized. In order for such a system M to exist, we show that in one selective measurement of an observable of a quantum system S 0 of particles in S, there exists a negative entropy transfer from M to S that can be directly transformed into an amount of Helmholtz free energy of where T is the thermodynamic temperature of the system S. Equivalently, an extra amount of work, , is required to be done by the system M.

  19. Measures for Management of Land Use Master Plan Released

    Institute of Scientific and Technical Information of China (English)

    Qian Fang; Li Caige

    2017-01-01

    On May 8,2017,the Measures for Management of Land Use Master Plan was released for enforcement by the Ministry of Land and Resources.The Measures clearly points out that a land use master plan is an essential part of the national spatial planning system and an important basis for implementing land use modes control and management,

  20. Work environment perceptions following relocation to open-plan offices: A twelve-month longitudinal study.

    Science.gov (United States)

    Bergström, Jessica; Miller, Michael; Horneij, Eva

    2015-01-01

    A workplace's design can have various positive or negative effects on the employees and since the 1970s the advantages and disadvantages of open-plan offices have been discussed. The aim of this study was to investigate perceived health, work environment and self-estimated productivity one month before and at three, six and twelve months after relocation from individual offices to an open-plan office environment. Employees from three departments within the same company group and who worked with relatively similar tasks and who were planned to be relocated from private offices to open-plan offices were invited to participate. Questionnaires comprising items from The Salutogenic Health Indicator Scale, The Work Experience Measurement Scale, the questionnaire by Brennan et al. about perceived performance and one question from the Work Ability Index were sent to participants one month before relocation (baseline) to open-plan offices and then at three, six and twelve months after relocation. At baseline, 82 questionnaires were sent out. The response rate was 85%. At the follow-ups 77-79 questionnaires were sent out and the response-rate was 70%-81%. At follow-ups, perceived health, job satisfaction and performance had generally deteriorated. The results of the study indicate that employees' perception of health, work environment and performance decreased during a 12 month period following relocation from individual offices to open-plan offices.

  1. Work plan, AP-102 mixer pump removal and pump replacement

    International Nuclear Information System (INIS)

    Jimenez, R.F.

    1994-01-01

    The objective of this work plan is to plan the steps and estimate the costs required to remove the failed AP-102 mixer pump, and to plan and estimate the cost of the necessary design and specification work required to order a new, but modified, mixer pump including the pump and pump pit energy absorbing design. The main hardware required for the removal of the mixer is as follows: a flexible receiver and blast shield; a metal container for the pulled mixer pump; and a trailer and strongback to haul and manipulate the container. Additionally: a gamma scanning device will be needed to detect the radioactivity emanating from the mixer as it is pulled from the tank; a water spray system will be required to remove tank waste from the surface of the mixer as it is pulled from the AP-102 tank; and a lifting yoke to lift the mixer from the pump pit (the SY-101 Mixer Lifting Yoke will be used). A ''green house'' will have to be erected over the AP-102 pump pit and an experienced Hoisting and Rigging crew must be assembled and trained in mixer pump removal methods before the actual removal is undertaken

  2. Toulouse dykes: reducing failure hazard combining structural reinforcement works and organization measures

    Directory of Open Access Journals (Sweden)

    Savatier Jérémy

    2016-01-01

    Temporary mitigation measures have already been included in the flood management plan, and consist in preventive evacuation of exposed population for flood levels lower than the 1875 reference flood level, as long as the reinforcement works are not completed. Several additional mitigation measures have been proposed such as: structural reinforcement of a few dykes section, a vegetation management plan, and improvement measures of the flood management plan and the need to continue regular training emergency exercises.

  3. Validating the Electric Maze Task as a Measure of Planning

    Science.gov (United States)

    Sheppard, Kelly W.; Cheatham, Carol L.

    2017-01-01

    The Electric Maze Task (EMT) is a novel planning task designed to allow flexible testing of planning abilities across a broad age range and to incorporate manipulations to test underlying planning abilities, such as working-memory and inhibitory control skills. The EMT was tested in a group of 63 typically developing 7- to 12-year-olds.…

  4. In situ vitrification laboratory-scale test work plan

    International Nuclear Information System (INIS)

    Nagata, P.K.; Smith, N.L.

    1991-05-01

    The Buried Waste Program was established in October 1987 to accelerate the studies needed to develop a long-term management plan for the buried mixed waste at the Radioactive Waste Management Complex at Idaho Engineering Laboratory. The In Situ Vitrification Project is being conducted in a Comprehensive Environmental Response, Compensation, and Liability Act feasibility study format to identify methods for the long-term management of mixed buried waste. To support the overall feasibility study, the situ vitrification treatability investigations are proceeding along the three parallel paths: laboratory-scale tests, intermediate field tests, and field tests. Laboratory-scale tests are being performed to provide data to mathematical modeling efforts, which, in turn, will support design of the field tests and to the health and safety risk assessment. This laboratory-scale test work plan provides overall testing program direction to meet the current goals and objectives of the in situ vitrification treatability investigation. 12 refs., 1 fig., 7 tabs

  5. Structural master plan of flood mitigation measures

    OpenAIRE

    A. Heidari

    2009-01-01

    Flood protection is one of the practical methods in damage reduction. Although it not possible to be completely protected from flood disaster but major part of damages can be reduced by mitigation plans. In this paper, the optimum flood mitigation master plan is determined by economic evaluation in trading off between the construction costs and expected value of damage reduction as the benefits. Size of the certain mitigation alternative is also be obtained by risk analysis by accepting possi...

  6. A plan of radiation work market on the web

    International Nuclear Information System (INIS)

    Nakagawa, Haruo; Chino, Koichi

    2002-01-01

    In Japan there are many kinds of radiation facilities, and a great number of radiation employees are engaged in plant repairing. It is therefore, very important to strive for employee controls, radiation controls, health examinations and data control. Furthermore, it is necessary to establish a total data management system that processes numerous amounts of data concerning radiation employees. The present paper proposes the establishment of a radiation work market on the web using a total data management system. The system will include radiation employee control information service for members who are planning new employment contracts. (author)

  7. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  8. In-well vapor stripping drilling and characterization work plan

    International Nuclear Information System (INIS)

    Koegler, K.J.

    1994-01-01

    This work plan provides the information necessary for drilling, sampling, and hydrologic testing of wells to be completed in support of a demonstration of the in-well vapor stripping system. The in-well vapor stripping system is a remediation technology designed to preferentially extract volatile organic compounds (VOCs) from contaminated groundwater by converting them to a vapor phase. Air-lift pumping is used to lift and aerate groundwater within the well. The volatiles escaping the aerated water are drawn off by a slight vacuum and treated at the surface while the water is allowed to infiltrate the vadose zone back to the watertable

  9. Action Planning Mediates Guidance of Visual Attention from Working Memory

    Directory of Open Access Journals (Sweden)

    Tobias Feldmann-Wüstefeld

    2015-01-01

    Full Text Available Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles, thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  10. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    Science.gov (United States)

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  11. Role of working memory components in planning performance of individuals with Parkinson's disease.

    Science.gov (United States)

    Altgassen, Mareike; Phillips, Louise; Kopp, Ute; Kliegel, Matthias

    2007-06-11

    The current study investigated the involvement of all four components of Baddeley's [Baddeley, A. D. (2000). The episodic buffer: A new component of working memory? Trends in Cognitive Sciences, 4, 417-423] revised working memory model in deficits of planning accompanying Parkinson's disease (PD). PD resulted in poorer formulation and execution of plans, as measured by the Tower of London task. PD also reduced the efficiency of the episodic buffer and central executive components of working memory, but did not influence storage of verbal or visuospatial information. Planning deficits in PD were particularly linked to problems in integrating multimodal short-term information with long-term memory (episodic buffer). These results emphasize the importance of integrative and executive processing in cognitive problems in PD, rather than simple memory deficits.

  12. Standardization of Work Measurement. Volume 7, Bench Work Occupations

    National Research Council Canada - National Science Library

    1975-01-01

    ..., sew, assemble, inspect, repair, test, and similarly work relatively small objects and materials, such as metal products, electronic components, electrical appliances, instruments, footwear, and garments...

  13. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  14. Joint Integration Test Facility (JITF) Engineering II Performance Measurement Plans

    National Research Council Canada - National Science Library

    Boucher, Joanne

    2001-01-01

    ..., effectiveness, and accountability in federal programs and spending. The plan establishes six separate performance measurements, which correlate directly to customer satisfaction, Intelligence Mission Application (IMA...

  15. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  16. Working session 4: Preventative and corrective measures

    International Nuclear Information System (INIS)

    Clark, R.; Slama, G.

    1997-01-01

    The Preventive and Corrective Measures working session included 13 members from France, Germany, Japan, Spain, Slovenia, and the United States. Attendee experience included regulators, utilities, three steam generator vendors, consultants and researchers. Discussions centered on four principal topics: (1) alternate materials, (2) mechanical mitigation, (3) maintenance, and (4) water chemistry. New or replacement steam generators and original equipment steam generators were separately addressed. Four papers were presented to the session, to provide information and stimulate various discussion topics. Topics discussed and issues raised during the several meeting sessions are provided below, followed by summary conclusions and recommendations on which the group was able to reach a majority consensus. The working session was composed of individuals with diverse experience and varied areas of specialized expertise. The somewhat broad range of topics addressed by the group at times saw discussion participation by only a few individuals. As in any technical meeting where all are allowed the opportunity to speak their mind, straying from an Individual topic was not unusual. Where useful, these stray topics are also presented below within the context In which they occurred. The main categories of discussion were: minimize sludge; new steam generators; maintenance; mechanical mitigation; water chemistry

  17. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  18. Predicting College Women's Career Plans: Instrumentality, Work, and Family

    Science.gov (United States)

    Savela, Alexandra E.; O'Brien, Karen M.

    2016-01-01

    This study examined how college women's instrumentality and expectations about combining work and family predicted early career development variables. Specifically, 177 undergraduate women completed measures of instrumentality (i.e., traits such as ambition, assertiveness, and risk taking), willingness to compromise career for family, anticipated…

  19. Repository-Based Software Engineering Program: Working Program Management Plan

    Science.gov (United States)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  20. A social survey on the noise impact in open-plan working environments in China.

    Science.gov (United States)

    Zhang, Mei; Kang, Jian; Jiao, Fenglei

    2012-11-01

    The aim of this study is to reveal noise impact in open-plan working environments in China, through a series of questionnaire surveys and acoustic measurements in typical open-plan working environments. It has been found that compared to other physical environmental factors in open-plan working environments, people are much less satisfied with the acoustic environment. The noise impact in the surveyed working environments is rather significant, in terms of sound level inside the office, understanding of colleagues' conversation, and the use of background music such as music players. About 30-50% of the interviewees think that various noise sources inside and outside offices are 'very disturbing' and 'disturbing', and the most annoying sounds include noises from outside, ventilation systems, office equipment, and keyboard typing. Using higher panels to separate work space, or working in enclosed offices, are regarded as effective improvement measures, whereas introducing natural sounds to mask unwanted sounds seems to be not preferable. There are significant correlations between the evaluation of acoustic environment and office symptoms, including hypersensitivity to loud sounds, easily getting tired and depression. There are also significant correlations between evaluation of various acoustics-related factors and certain statements relating to job satisfaction, including sensitivity to noise, as well as whether conversations could be heard by colleagues. Copyright © 2012 Elsevier B.V. All rights reserved.

  1. Measuring polio immunity to plan immunization activities.

    Science.gov (United States)

    Voorman, Arend; Lyons, Hil M

    2016-11-21

    The Global Polio Eradication Initiative is closer than ever to achieving a polio-free world. Immunization activities must still be carried out in non-endemic countries to maintain population immunity at levels which will stop poliovirus from spreading if it is re-introduced from still-infected areas. In areas where there is no active transmission of poliovirus, programs must rely on surrogate indicators of population immunity to determine the appropriate immunization activities, typically caregiver-reported vaccination history obtained from non-polio acute flaccid paralysis patients identified through polio surveillance. We used regression models to examine the relationship between polio vaccination campaigns and caregiver-reported polio vaccination history. We find that in many countries, vaccination campaigns have a surprisingly weak impact on these commonly used indicators. We conclude that alternative criteria and data, such as routine immunization indicators from vaccination records or household surveys, should be considered for planning polio vaccination campaigns, and that validation of such surrogate indicators is necessary if they are to be used as the basis for program planning and risk assessment. We recommend that the GPEI and similar organizations consider or continue devoting additional resources to rigorously study population immunity and campaign effectiveness in at-risk countries. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  2. Structural master plan of flood mitigation measures

    Directory of Open Access Journals (Sweden)

    A. Heidari

    2009-01-01

    Full Text Available Flood protection is one of the practical methods in damage reduction. Although it not possible to be completely protected from flood disaster but major part of damages can be reduced by mitigation plans. In this paper, the optimum flood mitigation master plan is determined by economic evaluation in trading off between the construction costs and expected value of damage reduction as the benefits. Size of the certain mitigation alternative is also be obtained by risk analysis by accepting possibility of flood overtopping. Different flood mitigation alternatives are investigated from various aspects in the Dez and Karun river floodplain areas as a case study in south west of IRAN. The results show that detention dam and flood diversion are the best alternatives of flood mitigation methods as well as enforcing the flood control purpose of upstream multipurpose reservoirs. Dyke and levees are not mostly justifiable because of negative impact on down stream by enhancing routed flood peak discharge magnitude and flood damages as well.

  3. Planning Decrements in Healthy Aging: Mediation Effects of Fluid Reasoning and Working Memory Capacity.

    Science.gov (United States)

    Köstering, Lena; Leonhart, Rainer; Stahl, Christoph; Weiller, Cornelius; Kaller, Christoph P

    2016-03-01

    Although age-related differences in planning ability are well known, their cognitive foundations remain a matter of contention. To elucidate the specific processes underlying planning decrements in older age, the relative contributions of fluid reasoning, working memory (WM) capacity, and processing speed to accuracy on the Tower of London (TOL) planning task were investigated. Mediation analyses were used to relate overall and search depth-related TOL accuracy from older (N = 106; 60-89 years) and younger adults (N = 69; 18-54 years) to age and measures of fluid reasoning, WM capacity, and speed. For overall planning, fluid abilities mediated the effects of age, WM capacity, and speed in older adults. By contrast, fluid abilities and WM capacity mediated each other in younger adults. For planning accuracy under low demands on the depth of search, WM capacity was specifically important in older age, whereas younger adults recruited both WM capacity and fluid reasoning. Under high search-depth-demands, fluid abilities underlay the cognitive operations critical for resolving move interdependencies in both age groups. Fluid abilities and WM capacity undergo significant changes from younger to older age in their unique contribution to planning, which might represent a mechanism whereby planning decrements in older age are brought about. © The Author 2014. Published by Oxford University Press on behalf of The Gerontological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  4. Performance measures for metropolitan planning organizations.

    Science.gov (United States)

    2012-04-01

    Performance measurement is a topic of increasing importance to transportation agencies, as issues with : funding shortfalls and concerns about transportation system efficiency lead to a shift in how transportation : decision making is carried out. In...

  5. Final Work Plan: Phase I Investigation at Bladen, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division. Applied Geosciences and Environmental Management Section; Yan, Eugene [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division

    2014-07-01

    The village of Bladen is a town of population approximately 237 in the northwest part of Webster County, Nebraska, 30 mi southwest of Hastings and 140 mi southwest of Lincoln, Nebraska. In 2000, the fumigant-related compound carbon tetrachloride was detected in public water supply well PWS 68-1, at a trace level. Low-level contamination, below the maximum contamination level (MCL) of 5.0 μg/L, has been detected intermittently in well PWS 68-1 since 2000, including in the last sample taken in July 2013. In 2006, the village installed a new well, PWS 2006-1, that remains free of contamination. Because the carbon tetrachloride found in well PWS 68-1 might be linked to historical use of fumigants containing carbon tetrachloride at grain storage facilities, including its former facility in Bladen, the CCC/USDA is proposing an investigation to (1) delineate the source and extent of the carbon tetrachloride contamination potentially associated with its former facility, (2) characterize pathways and controlling factors for contaminant migration in the subsurface, and (3) establish a basis for estimating potential health and environmental risks. The work will be performed in accordance with the Intergovernmental Agreement established between the NDEQ and the Farm Service Agency of the USDA. The site investigation at Bladen will be implemented in phases, so that data collected and interpretations developed during each phase can be evaluated to determine if a subsequent phase of investigation is warranted and, if warranted, to provide effective guidance for the subsequent investigation activities. This Work Plan identifies the specific technical objectives and defines the scope of work proposed for the Phase I investigation by compiling and evaluating historical data. The proposed investigation activities will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research

  6. The Impact of Appearance Management Training, Work Status, and Plans after High School on Opinions Regarding Appearance at Work and School

    Science.gov (United States)

    Freeburg, Beth Winfrey; Arnett, Sally E.

    2010-01-01

    The purpose of this study was to measure the effect of appearance management training, work status, and plans after high school on students' opinions about appearance at school and at work. A nonprobability sample of 132 high school juniors and seniors in a consumer education class were administered the Appearance Management Survey before and…

  7. [Planning a Health Residence for Prison Security Measures, Tuscany (Italy)].

    Science.gov (United States)

    Porfido, Eugenio; Colombai, Renato; Scarpa, Franco; Totaro, Michele; Tani, Luca; Baldini, Claudio; Baggiani, Angelo

    2016-01-01

    Health Residences for Prison Security Measures are facilities hosting psychotic persons who have committed crimes and providing them with personalized rehabilitation and treatment plans to promote their reinstatement in society. The aim of this study was to describe the criteria for planning and designing a prison health residence in the Tuscany region (Italy), to be managed by the regional healthcare service, in line with current regulations, with dedicated staff for providing specific treatment plans and programmes.

  8. A working plan for working group 2 'enrichment' within the scope of INFCE

    International Nuclear Information System (INIS)

    1977-01-01

    A working plan for INFCE/WG.2 is presented, outlining the major questions which the group needs to answer under the headings: 1. Enrichment needs and supply, 2. Models for cross-investment, 3. Market situation, 4. Technical and economic assessment of the different enrichment technologies, and 5. Safeguards aspects. It is suggested that the group's assessment should include: 1. Future enrichment capacities, 2. Multinational or regional fuel cycle centres, 3. Possible patterns for guarantees of supply, and 4. Special needs of developing countries

  9. Indonesia's family planning program works toward self-sufficiency.

    Science.gov (United States)

    Kunii, C

    1989-07-01

    Started in 1970, the Indonesian Family Planning Program is doing very well. It is coordinated by the National Family Planning Coordinating Board (BKKBN). Many new acceptors are being enrolled daily. Its aim is to reduce to 1971 fertility rate of 50% in 1990. Strategy factors are listed. The following paper, "BKKBN and the Expanding Role of Private Sector Family Planning Services and Commercial Contraceptive Sales in Indonesia," by Dr. Haryono Suyono is introduced. Another article, "A breakthrough in Family Planning Promotional Strategy," by Mr. Sumarsono is also introduced. This article deals with the marketing aspect of Indonesia's family planning program.

  10. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  11. Technical Work Plan For: Meteorological Monitoring and Data Analysis

    International Nuclear Information System (INIS)

    C.T. Bastian

    2003-01-01

    The meteorological monitoring and analysis program has three overall objectives. First, the program will acquire qualified meteorological data from monitoring activities in the Environmental Safety and Health (ES and H) network, including appropriate controls on measuring and test equipment. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The continuously operating monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. Second, the program will process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. Third, reports containing analyses or calculations could be created to provide information to data requesters

  12. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  13. Effects of dopamine D2/D3 receptor antagonism on human planning and spatial working memory.

    Science.gov (United States)

    Naef, M; Müller, U; Linssen, A; Clark, L; Robbins, T W; Eisenegger, C

    2017-04-25

    Psychopharmacological studies in humans suggest important roles for dopamine (DA) D2 receptors in human executive functions, such as cognitive planning and spatial working memory (SWM). However, studies that investigate an impairment of such functions using the selective DA D2/3 receptor antagonist sulpiride have yielded inconsistent results, perhaps because relatively low doses were used. We believe we report for the first time, the effects of a higher (800 mg p.o.) single dose of sulpiride as well as of genetic variation in the DA receptor D2 gene (DA receptor D2 Taq1A polymorphism), on planning and working memory. With 78 healthy male volunteers, we apply a between-groups, placebo-controlled design. We measure outcomes in the difficult versions of the Cambridge Neuropsychological Test Automated Battery One-Touch Stockings of Cambridge and the self-ordered SWM task. Volunteers in the sulpiride group showed significant impairments in planning accuracy and, for the more difficult problems, in SWM. Sulpiride administration speeded response latencies in the planning task on the most difficult problems. Volunteers with at least one copy of the minor allele (A1+) of the DA receptor D2 Taq1A polymorphism showed better SWM capacity, regardless of whether they received sulpiride or placebo. There were no effects on blood pressure, heart rate or subjective sedation. In sum, a higher single dose of sulpiride impairs SWM and executive planning functions, in a manner independent of the DA receptor D2 Taq1A polymorphism.

  14. Design of emergency plans due to the failure risk of hydraulic works - Theory and case study

    International Nuclear Information System (INIS)

    Ochoa Rivera, Juan Camilo

    2006-01-01

    Dams are built to be highly safe hydraulic works. Nevertheless, they are not exempt from a certain failure risk, which turns in a variable value along the time service of the dam. As the mentioned dam-failure risk can be a significant hazard, analysis on dam-break is becoming important, as same as the assessment of its consequences. This type of studies are intended to reduce the costs linked to dam-failure, which are mainly due to the losses of human beings and material goods. A suitable way to minimize such losses consists of designing emergency plans, which permit to prepare and implant appropriate protection measures. A methodological framework to carry out this kind of emergency plans is introduced in this paper, accompanied by a case study corresponding to an emergency plan of a Spanish dam

  15. Parents as Role Models: Parental Behavior Affects Adolescents' Plans for Work Involvement

    Science.gov (United States)

    Wiese, Bettina S.; Freund, Alexandra M.

    2011-01-01

    This study (N = 520 high-school students) investigates the influence of parental work involvement on adolescents' own plans regarding their future work involvement. As expected, adolescents' perceptions of parental work behavior affected their plans for own work involvement. Same-sex parents served as main role models for the adolescents' own…

  16. 7 CFR 23.13 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... statement including identification of high priority knowledge, skill, and organization needs for rural..., which in turn support State development strategies. (3) A concise statement of the organization structure for planning and conducting the program funded under section 503(b)(2). (4) A plan for evaluating...

  17. 7 CFR 23.6 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... relationship of this program to ongoing planning and development efforts. (3) The organizational structure for... research program techniques, and organizational structure for planning and conducting each program... separate concise statement describing specific extension projects to be funded under each program. The...

  18. 324 Building life cycle dose estimates for planned work

    International Nuclear Information System (INIS)

    Landsman, S.D.; Peterson, C.A.; Thornhill, R.E.

    1995-09-01

    This report describes a tool for use by organizational management teams to plan, manage, and oversee personnel exposures within their organizations. The report encompasses personnel radiation exposures received from activities associated with the B-Cell Cleanout Project, Surveillance and Maintenance Project, the Mk-42 Project, and other minor activities. It is designed to provide verifiable Radiological Performance Reports. The primary area workers receive radiation exposure is the Radiochemical Engineering Complex airlock. Entry to the airlock is necessary for maintenance of cranes and other equipment, and to set up the rail system used to move large pieces of equipment and shipping casks into and out of the airlock. Transfers of equipment and materials from the hot cells in the complex to the airlock are required to allow dose profiles of waste containers, shuffling of waste containers to allow grouting activities to go on, and to allow maintenance of in-cell cranes. Both DOE and the Pacific Northwest Laboratory (PNL) are currently investing in state-of-the-art decontamination equipment. Challenging goals for exposure reduction were established for several broad areas of activity. Exposure estimates and goals developed from these scheduled activities will be compared against actual exposures for scheduled and unscheduled activities that contributed to exposures received by personnel throughout the year. Included in this report are life cycle exposure estimates by calendar year for the B-Cell Cleanout project, a three-year estimate of exposures associated with Surveillance and Maintenance, and known activities for Calendar Year (CY) 1995 associated with several smaller projects. These reports are intended to provide a foundation for future dose estimates, by year, requiring updating as exposure conditions change or new avenues of approach to performing work are developed

  19. 324 Building life cycle dose estimates for planned work

    Energy Technology Data Exchange (ETDEWEB)

    Landsman, S.D.; Peterson, C.A.; Thornhill, R.E.

    1995-09-01

    This report describes a tool for use by organizational management teams to plan, manage, and oversee personnel exposures within their organizations. The report encompasses personnel radiation exposures received from activities associated with the B-Cell Cleanout Project, Surveillance and Maintenance Project, the Mk-42 Project, and other minor activities. It is designed to provide verifiable Radiological Performance Reports. The primary area workers receive radiation exposure is the Radiochemical Engineering Complex airlock. Entry to the airlock is necessary for maintenance of cranes and other equipment, and to set up the rail system used to move large pieces of equipment and shipping casks into and out of the airlock. Transfers of equipment and materials from the hot cells in the complex to the airlock are required to allow dose profiles of waste containers, shuffling of waste containers to allow grouting activities to go on, and to allow maintenance of in-cell cranes. Both DOE and the Pacific Northwest Laboratory (PNL) are currently investing in state-of-the-art decontamination equipment. Challenging goals for exposure reduction were established for several broad areas of activity. Exposure estimates and goals developed from these scheduled activities will be compared against actual exposures for scheduled and unscheduled activities that contributed to exposures received by personnel throughout the year. Included in this report are life cycle exposure estimates by calendar year for the B-Cell Cleanout project, a three-year estimate of exposures associated with Surveillance and Maintenance, and known activities for Calendar Year (CY) 1995 associated with several smaller projects. These reports are intended to provide a foundation for future dose estimates, by year, requiring updating as exposure conditions change or new avenues of approach to performing work are developed.

  20. JOYO MK-III modification work on heat transport system. Working plan and plant control

    International Nuclear Information System (INIS)

    Isozaki, K.; Ichige, S.; Ohshima, J.

    2002-07-01

    The MK-III project to improve the irradiation capability of the experimental fast reactor JOYO have been in underway since 1987. The increase of fast neutron flux and the enlargement of that field increase the reactor thermal rate from 100 MWt to 140 MWt. To increase cooling capacity of heat transport system, intermediate heat exchangers (IHXs), dump heat exchangers (DHXs), piping connecting to IHXs and DHXs, main motors on primary and secondary main circulation pumps were replaced. The replacement of these large components was carried out under following hard conditions. 1) Limitation of work space, 2) Fuel subassembly and molten sodium in the reactor vessel, 3) high radiation circumstances for primary cooling system, 4) treatment of radioactive sodium (radioactive sodium and corrosion product such as 60 Co, 54 Mn). There are little experiences of this kind of work in the world. Therefore the organization, working plan and safety management points were carefully examined and established, based on the previous experience of JOYO operation and maintenance, research and development results of safety treatment of sodium, experience of previous work on sodium facilities. Followings results were obtained and effectiveness was confirmed in the work. (1) Development of most suitable working plan derived from elements and full size mock up experiments, reduction of exposure time by workers training, reduction of radiation dose by installation of temporal radiation shielding were useful to reduce radiation dose. The usage of seal bag was useful to prevent the contamination spreading over. (2) The usage of seal bag, oxygen concentration monitoring in the seal bag, nitrogen concentration monitoring in the cooling system cover gas, low pressure control of cover gas were useful to reduce the inflow of oxygen to cooling system. (3) The bite cutting method for piping in air and press down cutting by roller cutter in the seal bag to prevent inflow of cutting piece, stopper

  1. Regulatory Technology Development Plan - Sodium Fast Reactor. Mechanistic Source Term - Trial Calculation. Work Plan

    International Nuclear Information System (INIS)

    Grabaskas, David; Bucknor, Matthew; Jerden, James; Brunett, Acacia J.

    2016-01-01

    The overall objective of the SFR Regulatory Technology Development Plan (RTDP) effort is to identify and address potential impediments to the SFR regulatory licensing process. In FY14, an analysis by Argonne identified the development of an SFR-specific MST methodology as an existing licensing gap with high regulatory importance and a potentially long lead-time to closure. This work was followed by an initial examination of the current state-of-knowledge regarding SFR source term development (ANLART-3), which reported several potential gaps. Among these were the potential inadequacies of current computational tools to properly model and assess the transport and retention of radionuclides during a metal fuel pool-type SFR core damage incident. The objective of the current work is to determine the adequacy of existing computational tools, and the associated knowledge database, for the calculation of an SFR MST. To accomplish this task, a trial MST calculation will be performed using available computational tools to establish their limitations with regard to relevant radionuclide release/retention/transport phenomena. The application of existing modeling tools will provide a definitive test to assess their suitability for an SFR MST calculation, while also identifying potential gaps in the current knowledge base and providing insight into open issues regarding regulatory criteria/requirements. The findings of this analysis will assist in determining future research and development needs.

  2. Path Planning & Measurement Registration for Robotic Structural Asset Monitoring

    OpenAIRE

    Pierce , Stephen Gareth; Macleod , Charles Norman; Dobie , Gordon; Summan , Rahul

    2014-01-01

    International audience; The move to increased levels of autonomy for robotic delivery of inspection for asset monitoring, demands a structured approach to path planning and measurement data presentation that greatly surpasses the more ad‐,hoc approach typically employed by remotely controlled, but manually driven robotic inspection vehicles. The authors describe a traditional CAD/CAM approach to motion planning (as used in machine tool operation) which has numerous benefits including the...

  3. Advocacy for International Family Planning: What Terminology Works?

    Science.gov (United States)

    Huber, Douglas; Martin, Raymond; Bormet, Mona

    Advocating for international family planning while avoiding miscommunications with politically and religiously conservative policy makers and the public requires care and clarity with language. We find that terms such as "international family planning" are well received when the meaning is clearly explained, such as "enabling couples to determine the number and timing of pregnancies, including the voluntary use of methods for preventing pregnancy - not including abortion - harmonious with their beliefs and values". Family planning also helps reduce abortions - a powerful message for conservative policy makers and the public. We concur with Dyer et al. (2016) that the messenger is important; we find that many of the most effective advocates are religious leaders and faith-based health providers from the Global South. They know and validate the importance of family planning for improving family health and reducing abortions in their communities. "Healthy timing and spacing of pregnancy" is positive language for policy makers, especially when describing the health impact for women and children. Universal access to contraceptive services is emerging as vital for family health and also to help achieve the Sustainable Development Goals (UN 2015). Language on international family planning will evolve, and clarity of meaning will be foundational for effective advocacy.

  4. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  5. Work program analysis - defining the capability/risk plan

    International Nuclear Information System (INIS)

    Hrinivich, W.A.

    2004-01-01

    Bruce Power has developed and implemented an analysis methodology (Work Program Analysis) to assess and address corporate business risk associated with work group capability. Work Program Analysis is proving to be an excellent tool for identifying and supporting key business decisions facing the line and senior management at Bruce Power. The following describes the methodology, its application and the results achieved. (author)

  6. Does Holistic Planned Grazing™ work on native rangelands ...

    African Journals Online (AJOL)

    The balance of papers in this Special Issue show that how Holistic Planned Grazing™ is managed and where it is used impacts the efficacy of the approach. While we will do well to develop more mechanistic models that can identify these thresholds and test them in real-life situations, it is certain that broad generalisations ...

  7. Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

    International Nuclear Information System (INIS)

    1995-08-01

    The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems' ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL's groundwater problems

  8. Basic plans on measures of mine site at the Ningyo-Toge Environmental Engineering Center

    International Nuclear Information System (INIS)

    2002-04-01

    At the Ningyo-Toge and its peripheries, there are some mine relating facilities and apparatuses finishing their actions such as wasted stones and slags accumulation sites, and so on formed by results of searching and mining works of uranium mine carried out from beginning of 1950s by the Nuclear Fuels Corporation and the Power Reactor and Nuclear Fuel Development Corporation, both of which are predecessors of the Japan Nuclear Cycle Development Institute (JNC). These facilities are, at present, adequately maintained and managed by the Ningyo-Toge Environmental Engineering Center, but as resource development of uranium was positioned to a disposal business on JNC, JNC has investigated on optimal measuring methods and testing plans to evaluate their safety under cooperation with other works of JNC, to summarize a draft of the basic plans on measures of mine site'. Here were described two drafts of the 'Basic plans on measures of mine site' summarized on concepts and indications of whole of measures of mine relating facilities sites and of the 'Proof test plan' summarized on testing plans containing concrete measures to obtain basic data and knowledge required for progressing the measures and a proof test. (G.K.)

  9. Measuring individual work performance: Identifying and selecting indicators

    NARCIS (Netherlands)

    Koopmans, L.; Bernaards, C.M.; Hildebrandt, V.H.; de Vet, H.C.W.; van der Beek, A.J.

    2014-01-01

    BACKGROUND: Theoretically, individual work performance (IWP) can be divided into four dimensions: task performance, contextual performance, adaptive performance, and counterproductive work behavior. However, there is no consensus on the indicators used to measure these dimensions.

  10. Measuring individual work performance: identifying and selecting indicators

    NARCIS (Netherlands)

    Koopmans, L.; Bernaards, C.M.; Hildebrandt, V.H.; Vet, H.C de; Beek, A.J. van der

    2014-01-01

    BACKGROUND: Theoretically, individual work performance (IWP) can be divided into four dimensions: task performance, contextual performance, adaptive performance, and counterproductive work behavior. However, there is no consensus on the indicators used to measure these dimensions. OBJECTIVE: This

  11. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  12. Information system planning work on maintenance metrological equipment

    Directory of Open Access Journals (Sweden)

    Dmitry V. Shtoller

    2011-05-01

    Full Text Available Computerization has entered into all human activities. Important role in the work now is a workstation, which increases productivity. Did not remain without attention and work of the metrological services of enterprises. Electronic records can help solve many problems for the organization of data.

  13. Technical Work Plan for: Additional Multiscale Thermohydrologic Modeling

    International Nuclear Information System (INIS)

    B. Kirstein

    2006-01-01

    will be evaluated and justified. Some of this evaluation will be conducted in conjunction with the post-model development validation activity involving comparisons of predicted TH conditions with measured TH conditions in the DST. The expected result is that, consistent with what was found in Revision 03 of Multiscale Thermohydrologic Model (BSC 2005 [DIRS 173944], Section 6.3.9), near-field/in-drift TH behavior is insensitive to a wide range of host-rock hydrologic property values. It is the intention of the work described in this TWP to propagate the new infiltration fluxes from the replacement infiltration model, by using the percolation fluxes from the revised site-scale unsaturated zone (UZ) flow model that has applied those new infiltration fluxes. The percolation flux distributions will be obtained from the updated site-scale UZ flow model, which has applied updated infiltration flux maps. Another objective of the work scope is to develop, implement, and validate a revised TH submodel-construction approach. This revised approach utilizes interpolation among a set of generic LDTH submodels that are run for a range of percolation flux histories that cover a sufficiently broad range of infiltration flux uncertainty, as well as for four host-rock units (two lithophysal units and two nonlithophysal units), and for three thermal property sets (low, mean, and high). A key motivation for this revised LDTH submodel-construction approach is to enable the MSTHM to be more flexible in addressing a broad range of infiltration flux cases. This approach allows the generic LDTH submodel simulations to be conducted prior to receiving percolation flux maps

  14. Geotechnical information as an important element when planning and designing civil engineering work Bogotá

    OpenAIRE

    Denisse Cangrejo Aljure; Carlos Gustavo Infante

    2010-01-01

    The city of Bogota provides a dynamic scenario re civil construction work; it is thereby essential to have relevant information available for the suitable planning and evaluation of engineering work from both the structural and budgetary points of view. The moisture content of soil has become a most important variable, given its great impact on placing structures in Bogota. This is why this work on city zoning aimed at orientating planning and designing civil engineering work has been done a...

  15. THE NUCLEAR MATERIAL MEASUREMENT PROGRAM PLAN FOR GOSATOMNADZOR OF RUSSIA

    International Nuclear Information System (INIS)

    Bokov, Dmitry; Byers, Kenneth R.

    2003-01-01

    As the Russian State regulatory agency responsible for oversight of nuclear material control and accounting (MC and A), Gosatomnadzor of Russia determines the status of the MC and A programs at Russian facilites by testing the nuclear material inventory for accounting record accuracy. Currently, Gosatomnadzor is developing and implementing an approach to planning and conducting MC and A inspections using non-destructive assay (NDA) instruments that will provide for consistent application of MC and A measurement inspection objectives throughtout Russia. This Gosatomnadzor NDA Program Plan documents current NDA measurement capability in all regions of Gosatomnadzor; provides justification for upgrades to equipment, procedures and training; and defines the inspector-facility operator interface as it relates to NDA measurement equipment use. This plan covers a three-year measurement program cycle, but will be reviewed and updated annually to ensure that adequate inspection resources are available to meet the demands of the inspection schedule. This paper presents the elements of this plan and describes the process by which Gosatomnadzor ensures that its NDA instruments are effectively utilized, procedures are developed and certified, and inspection personnel are properly trained to provide assurance that Russian nuclear facilities are in compliance with Russian MC and A regulations.

  16. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites

  17. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  18. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  19. From "Work-Family" to "Work-Life": Broadening Our Conceptualization and Measurement

    Science.gov (United States)

    Keeney, Jessica; Boyd, Elizabeth M.; Sinha, Ruchi; Westring, Alyssa F.; Ryan, Ann Marie

    2013-01-01

    Despite frequent reference to "work-life" issues in the organizational literature, little theoretical or empirical attention has been paid to nonwork areas beyond family. The purpose of the research described here is to move beyond work-family conflict to a broader conceptualization and measurement of work interference with life. A measure of work…

  20. Work-Plan Heroes: Student Strategies in Lower-Secondary Norwegian Classrooms

    Science.gov (United States)

    Dalland, Cecilie P.; Klette, Kirsti

    2014-01-01

    This article explores how individualized teaching methods, such as the use of work plans, create new student strategies in Norwegian lower secondary classrooms. Work plans, which are frequently set up as instructional tools in Norwegian classrooms, outline different types of tasks and requirements that the students are supposed to do during a…

  1. Simple Analysis of the university counsellors’ daily work and planning

    Institute of Scientific and Technical Information of China (English)

    Chen Juan

    2014-01-01

    Summary:Counsellor act as the backbone effect in students’ ideological and political work, who specialized in students’Ideological education and behavior management, and they are important component in teaching staff.

  2. The scaup conservation action plan: working toward coherence

    Science.gov (United States)

    Austin, Jane E.

    2010-01-01

    The last in a series of three workshops to develop a decision framework for the scaup conservation action plan was conducted in September 2009. Fifteen waterfowl biologists and managers met in Memphis, Tennessee at the Ducks Unlimited Headquarters to review and refine the decision statement, objectives, and prototype model for the continental scaup population, with a special focus on vital rate parameters that are affected during migration and winter. In a significant step toward coherence, the participants also developed models for incorporating human dimensions – hunters – into the decision framework, and to link the population of diving duck hunters with the continental scaup population.

  3. Developing measures for information ergonomics in knowledge work.

    Science.gov (United States)

    Franssila, Heljä; Okkonen, Jussi; Savolainen, Reijo

    2016-03-01

    Information ergonomics is an evolving application domain of ergonomics focusing on the management of workload in the real-world contexts of information-intensive tasks. This study introduces a method for the evaluation of information ergonomics in knowledge work. To this end, five key dimensions of information ergonomics were identified: contextual factors of knowledge work, multitasking, interruptions at work, practices for managing information load, and perceived job control and productivity. In total, 24 measures focusing on the above dimensions were constructed. The measures include, for example, the number of fragmented work tasks per work day. The measures were preliminarily tested in two Finnish organisations, making use of empirical data gathered by interviews, electronic questionnaires and log data applications tracking work processes on personal computers. The measures are applicable to the evaluation of information ergonomics, even though individual measures vary with regard to the amount of work and time needed for data analysis. Practitioner Summary: The study introduces a method for the evaluation of information ergonomics in knowledge work. To this end, 24 measures were constructed and tested empirically. The measures focus on contextual factors of knowledge work, multitasking, interruptions at work, practices for managing information load, and perceived job control and productivity.

  4. BC Hydro's business plan: a summary of BC Hydro's strategic business plan and performance measures

    International Nuclear Information System (INIS)

    2000-04-01

    This document contains a summary of BC Hydro's Strategic Plan and performance measures. The plan has been prepared in response to the recommendations of the Budget Process Review Panel, convened by the BC Government, which recommended that each public body, crown corporation, and other agencies of government, prepare an annual three year business plan. The document reviews the utility's current situation, provides an outline of the company's vision of its role, its mission and values, its strategic objectives (effective governance, efficiency and productivity; service excellence and value-added solutions; market development ; strong and capable organization) and the tools to be utilized in measuring performance. Various strategic issues (financial resources, the need to protect and enhance the value of electricity trading; the impact of information technology; power technology development; environmental trends and 'green energy' initiatives; workforce training and development) are also highlighted

  5. Propositions of measures for the Climate plan 2003; Propositions de mesures pour le plan climat 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-01

    In the framework of the PNLCC (national plan for the fight against the climatic change), the ''Plan Climat'' constitutes an operational and pragmatic tool for the measures application. The Climate Action network (RAC) precise in this document its point of view and its wishes for the ''Plan Climat'' in the energy sector, the transportation sector, the industry and fluoride gases sector, the construction sector, the wastes sector, the agriculture and forests sector, the local collectivities sector and the information and communication sector. For each sector, measures and actions are proposed, some need to be apply immediately, other are new ideas which are not pointed out in the PNLCC. (A.L.B.)

  6. [How to carry out work on family planning after adopting production responsibility systems in rural areas].

    Science.gov (United States)

    Xiao, S H

    1982-05-29

    After the Third Meeting of the Eleventh People's Congress, the entire responsibility for agricultural production was transferred to a lower level. Peasants in various areas have adopted the so called production responsibility system, and the phenomenon of an increased population rate has also appeared in some areas. In this article, the author discusses how to solve these problems created by the new situation. The 1st step is try to control population growth through socialist propaganda education, administrative measures, economic incentives and punishments, and family planning work. The 2nd step is to popularize the practice of having only 1 child per household in the rural areas. The 2nd and 3rd child in each family should be controlled and prohibited. This policy formulated by the Central Government should be carried out thoroughly. Families which follow the policy and have only 1 child should be encouraged with economic rewards, and those families which have 2 or more children should be punished economically. The 3rd step is to establish a national work team to be in charge of family planning and birth control. There should be an ideological unity among the nation's leadership. Party members and cadres should establish themselves as good examples for the people so that the population control work may become successful.

  7. Chemical Hygiene Plan for Onsite Measurement and Sample Shipping Facility Activities

    International Nuclear Information System (INIS)

    Price, W.H.

    1998-01-01

    This chemical hygiene plan presents the requirements established to ensure the protection of employee health while performing work in mobile laboratories, the sample shipping facility, and at the onsite radiological counting facility. This document presents the measures to be taken to promote safe work practices and to minimize worker exposure to hazardous chemicals. Specific hazardous chemicals present in the mobile laboratories, the sample shipping facility, and in the radiological counting facility are presented in Appendices A through G

  8. A working group for Japanese nuclear data measurement network

    International Nuclear Information System (INIS)

    Watanabe, Yukinobu

    2013-01-01

    A new working group in the Japanese Nuclear Data Committee has been established to make a cooperative network among researchers involved in nuclear data measurements and to discuss the strategy for nuclear data measurements. The working group activities are reported. (author)

  9. Ergonomic measures in construction work: enhancing evidence-based implementation

    NARCIS (Netherlands)

    Visser, S.

    2015-01-01

    Despite the development and availability of ergonomic measures in the construction industry, the number of construction workers reporting high physical work demands remains high. A reduction of the high physical work demands can be achieved by using ergonomic measures. However, these ergonomic

  10. 7 CFR 1924.5 - Planning development work.

    Science.gov (United States)

    2010-01-01

    ... cash to be furnished by the borrower, proceeds from cost sharing programs such as Agricultural...) Drawings, specifications, and estimates will fully describe the work. Technical data, tests, or engineering... building code. (i) Agricultural buildings that are not intended for human habitation are exempt from these...

  11. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey, a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H ampersand S) plan, and a waste management plan

  12. Study on optimization of normal plant outage work plan for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo

    2011-01-01

    This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)

  13. Development of nondestructive measurement of cold work rate, (2)

    International Nuclear Information System (INIS)

    Kamimura, Hideaki; Igarashi, Miyuki; Satoh, Masakazu; Miura, Makoto

    1978-01-01

    Cold-worked type 316 stainless steel will be used as fuel cladding material for the proto-type fast reactor MONJU. Cold work rate is an important parameter in swelling behavior of fuel cladding. It has been shown that austenitic stainless steel undergoes martensitic transformation during cold working. Nondestructive evaluation of cold work rate will be expected by measuring residual magnetism produced in the presence of martensitic phase when cold worked austenitic stainless steel is magnetized. In the previous work, the residual magnetism of cladding tubes of type 316 stainless steel was measured. The results have shown high degree of the correlation between residual magnetism and cold work rate. This paper reports the results of measurement on cold-rolled type 316 stainless steel plate samples. Dimensions of the specimens are 100 mm long and 3.5 and 7 mm wide. The apparatus and experimental procedures were similar to the previous work. Good agreement was found between the estimated cold work rate obtained in the previous work and that for cold rolled plate specimens. Measurement of residual magnetism in identical direction with magnetization showed smaller dispersion of data as compared with that in transverse direction. The residual magnetism near specimen surface hardly decreased when the surface of specimen was chemically removed. The reason for the comparative decrease in residual magnetism at 10% and 15% cold work rate is not clear. (Wakatsuki, Y.)

  14. Measuring work-life balance using time diary data

    OpenAIRE

    Kimberly Fisher; Richard Layte

    2004-01-01

    This paper examines how time diaries facilitate the study of work-life balance. We first compare aggregate time spent in paid work, unpaid work, attending to personal needs, and free time across seven countries using the Multinational Time Use Study. We then measure the overlap of work with other activities in two ways. First, we map the timing of episodes of work over the day, and overlay these maps onto maps of leisure time. A social group can be said to have a work-life balance if their pe...

  15. Effects of Individual Differences in Working Memory on Plan Presentational Choices.

    Science.gov (United States)

    Tintarev, Nava; Masthoff, Judith

    2016-01-01

    This paper addresses research questions that are central to the area of visualization interfaces for decision support: (RQ1) whether individual user differences in working memory should be considered when choosing how to present visualizations; (RQ2) how to present the visualization to support effective decision making and processing; and (RQ3) how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1). The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2), we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3) we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders) can improve effectiveness on a primary task, but only when controlling for individual variation in working memory.

  16. Effects of Individual Differences in Working Memory on Plan Presentational Choices

    Directory of Open Access Journals (Sweden)

    Nava Tintarev

    2016-11-01

    Full Text Available This paper addresses research questions that are central to the area of visualization interfaces for decision support: RQ1 whether individual user differences in working memory should be considered when making choosing how to present visualizations; RQ2 how to present the visualization to support effective decision making and processing; and RQ3 how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1. The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2, we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3 we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders can improve effectiveness on a primary task, but only when controlling for individual variation in working memory.

  17. The flow measurement plan for the primary system of SMART

    International Nuclear Information System (INIS)

    Lee, Jun; Seo, J. K.; Park, C. T.; Yoon, J. H.; Cho, B. H.; Lee, D. J.

    2001-08-01

    It is the common features of the integrated reactor that the main components of the primary system are installed within the reactor vessel, and so there are no any flow pipes connecting the reactor coolant pumps or steam generators. Due to no any flow pipes, it is impossible to measure the differential pressure at the primary system of the integrated reactor, and it also makes impossible measure the primary coolant flow rate. SMART is also a integrated reactor type, and have a problem as same as the above case. The objective of the study is to draw up the flow measurement plan for the primary system of SMART. In this study, firstly we reviewed the flow measurement methods at the primary system for the existing commercial nuclear power reactors. As a result of the review, we selected preliminarily the 3 methods which is a good possibility of application to SMART. The 3 methods are as follows. Flow measurement method by MCP rotation speed, flow measurement method by HBM, flow measurement method by pump motor power. For the above methods, we have evaluated whether they actually can be applied to SMART, and also have set up the concrete methodology. Finally we have made a selection of the above methods as the flow measurement plan for the primary system of SMART. Peculiarly, we did not found out a precedent which the direct pump motor power-flow rate curve is used as the flow measurement method in the existing commercial nuclear power reactors. Therefore, to use this method for SMART, it is needed to bear the follow-up measures in mind. The follow-up measures is included in this report

  18. Site health and safety plan/work plan for further characterization of waste drums at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Abston, J.P.; Burman, S.N.; Jones, D.L.

    1995-10-01

    The health and safety plan/work plan describes a strategy for characterizing the contents of 172 liquid waste and 33 solid waste drums. It also addresses the control measures that will be taken to (1) prevent or minimize any adverse impact on the environment or personnel safety and health and (2) meet standards that define acceptable management of hazardous and radioactive materials and wastes. When writing this document, the authors considered past experiences, recommendations, and best management practices to minimize possible hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or unplanned releases of hazardous or radioactive materials to air, soil, or surface water

  19. Single-shell tank closure work plan. Revision A

    International Nuclear Information System (INIS)

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs

  20. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  1. Structural equation modeling in the genetically informative study of the covariation of intelligence, working memory and planning

    Directory of Open Access Journals (Sweden)

    Voronin I.

    2016-01-01

    Full Text Available Structural equation modelling (SEM has become an important tool in behaviour genetic research. The application of SEM for multivariate twin analysis allows revealing the structure of genetic and environmental factors underlying individual differences in human traits. We outline the framework of twin method and SEM, describe SEM implementation of a multivariate twin model and provide an example of a multivariate twin study. The study included 901 adolescent twin pairs from Russia. We measured general cognitive ability and characteristics of working memory and planning. The individual differences in working memory and planning were explained mostly by person-specific environment. The variability of intelligence is related to genes, family environment, and person specific environment. Moderate and weak associations between intelligence, working memory, and planning were entirely explained by shared environmental effects.

  2. Retirement planning and work-related variables in Chinese older nurses: A cross-sectional study.

    Science.gov (United States)

    Liu, Peng-Cheng; Zhang, Huan-Huan; Zhang, Mei-Ling; Ying, Jie; Shi, Ying; Wang, Shou-Qi; Sun, Jiao

    2018-03-01

    To explore the situation of older nurses approaching retirement with regard to their retirement planning, and the relationship of their retirement planning behaviour with the job environment and job satisfaction under their current employment arrangements and other work-related variables. Nurse shortage has become a global phenomenon that can be alleviated by retaining older nurses in service. The Chinese government proposed the "Incremental Delay Retirement Age Policy." However, older nurses face delayed retirement but lack retirement plans. A cross-sectional questionnaire survey was conducted among a convenience sample of older retiring nurses (n = 152; 84.92% response rate) recruited from every department of four large general hospitals in Changchun, Jilin Province from June to August 2016. The majority of the respondents presented poor retirement planning (n = 122, 80.3%). The independent variables of information exchange with patients, teamwork and personal growth and development explained approximately 16.6% of the variance in retirement planning. Nurse-patient communication and personal growth and development can promote retirement planning, but teamwork is negatively related to retirement planning. Retirement planning by Chinese older nurses is related to certain work-related variables. However, many other work-related variables were not associated with retirement planning and require further research. Overall, Chinese older retiring nurses must improve their retirement planning practices. © 2017 John Wiley & Sons Ltd.

  3. Peer Review Plan for OPPT Work Plan Risk Assessment of 1 - Bromopropane (“1 - BP”)

    Science.gov (United States)

    This document outlines the peer review plan for a risk assessment which addresses occupational uses of 1-BP in dry-cleaning and foam gluing operations, consumer uses in aerosol solvent cleaners and spray adhesives, and its effects on human health.

  4. Analysis of Work Performance of Family Planning Field Workers in Male Family Planning Program in Cilacap District

    OpenAIRE

    Suryani, Untari Fajar; Nurjazuli, Nurjazuli; Arso, Septo Pawelas

    2013-01-01

    Target of MDG's to reach maternal mortality rate of 102/100.000 live-births and infantmortality rate of 23/1000 live-births had been performed by improving maternal health throughincreasing contraceptive prevalence rate and decreasing unmet need. Percentage of male withpermanent birth control in Cilacap district was in the lowest rank, 0.16%. Success of familyplanning program could not be separated from work performance of PLKB (family planning field workers); assessment of PLKB work performa...

  5. THE MEASUREMENT METHODOLOGY IMPROVEMENT OF THE HORIZONTAL IRREGULARITIES IN PLAN

    Directory of Open Access Journals (Sweden)

    O. M. Patlasov

    2015-08-01

    Full Text Available Purpose. Across the track superstructure (TSS there are structures where standard approach to the decision on the future of their operation is not entirely correct or acceptable. In particular, it concerns the track sections which are sufficiently quickly change their geometric parameters: the radius of curvature, angle of rotation, and the like. As an example, such portions of TSS may include crossovers where their component is within the so-called connecting part, which at a sufficiently short length, substantially changes curvature. The estimation of the position in terms of a design on the basis of the existing technique (by the difference in the adjacent arrows bending is virtually impossible. Therefore it is proposed to complement and improve the methodology for assessing the situation of the curve in plan upon difference in the adjacent versine. Methodology. The possible options for measuring horizontal curves in the plan were analyzed. The most adequate method, which does not contradict existing on the criterion of the possibility of using established standards was determined. The ease of measurement and calculation was took into account. Findings. Qualitative and quantitative verification of the proposed and existing methods showed very good agreement of the measurement results. This gives grounds to assert that this methodology can be recommended to the workers of track facilities in the assessment of horizontal irregularities in plan not only curves, but also within the connecting part of switch congresses. Originality. The existing method of valuation of the geometric position of the curves in the plan was improved. It does not create new regulations, and all results are evaluated by existing norms. Practical value. The proposed technique makes it possible, without creating a new regulatory framework, to be attached to existing one, and expanding the boundaries of its application. This method can be used not only for ordinary curves

  6. Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning

    Science.gov (United States)

    Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.

    2016-01-01

    Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…

  7. Employment Effects of educational measures for work-injured people

    DEFF Research Database (Denmark)

    Bach, Henning Bjerregaard; Datta Gupta, Nabanita; Høgelund, Jan

    Vocational rehabilitation in the form of education is the cornerstone of governmental rehabilitation programs for the work-disabled in many countries. Merging a 2004 Danish survey to register information from the Danish National Board of Industrial Injuries, we assess the employment effects...... employers a partial wage subsidy for disabled workers’ wages, by distinguishing between education effects of a return to wage-subsidized work versus a return to ordinary work. Unlike previous studies, we find a positive impact of educational measures on the probability of returning to work for the work...

  8. Strategic and Unpressured Within-Task Planning and Their Associations with Working Memory

    Science.gov (United States)

    Li, Shaofeng; Fu, Mengxia

    2018-01-01

    This study investigated the comparative effects of strategic and unpressured within-task planning on second language (L2) Chinese oral production and the role of working memory in mediating the effects of the two types of planning. Twenty-nine L2 Chinese learners at a large New Zealand university performed a narrative task after watching a…

  9. Demonstration testing and evaluation of in situ soil heating. Treatability study work plan (Revision 2)

    International Nuclear Information System (INIS)

    Sresty, G.C.

    1994-01-01

    A Treatability Study planned for the demonstration of the in situ electromagnetic (EM) heating process to remove organic solvents is described in this Work Plan. The treatability study will be conducted by heating subsurface vadose-zone soils in an organic plume adjacent to the Classified Burial Ground K-1070-D located at K-25 Site, Oak Ridge. The test is scheduled to start during the fourth quarter of FY94 and will be completed during the first quarter of FY95. Over the last nine years, a number of Government agencies (EPA, Army, AF, and DOE) and industries sponsored further development and testing of the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site under the proposed treatability study. Most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85 degrees to 95 degrees C. The efficiency of the treatment will be determined by comparing the concentration of contaminants in soil samples. Samples will be obtained before and after the demonstration for a measurement of the concentration of contaminants of concern. This document is a Treatability Study Work Plan for the demonstration program. The document contains a description of the proposed treatability study, background of the EM heating process, description of the field equipment, and demonstration test design

  10. Fire and evacuation drills make the CERN safety plans work

    CERN Multimedia

    Antonella Del Rosso

    2013-01-01

    Regular drills are a way of making sure that we are ready and able to react in the event of a fire or other adverse event. They are also a demanding test of all the technical and organisational measures in place to allow the quick and safe evacuation of buildings. Recently, large-scale drills took place in Building 40 and at Point 5 underground.   Group photo at Point 5, after the common evacuation drill. The ability to react to unexpected, adverse events relies in particular on training. This is why CERN’s safety teams organise regular drills. One of the most recent exercises took place on 26 March in Building 40. “Building 40 is a modern building fully equipped against fire, with two emergency exits in the central atrium. We also have 29 emergency guides distributed on each floor to guide people out of their offices,” says Kate Richardson, Territorial Safety Officer of the building. “The drills are very useful for testing the building's insta...

  11. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    Science.gov (United States)

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  12. 77 FR 20789 - Work Group on Measuring Systems for Taxis

    Science.gov (United States)

    2012-04-06

    ... DEPARTMENT OF COMMERCE National Institute of Standards and Technology Work Group on Measuring.... SUMMARY: The National Institute of Standards and Technology (NIST) is forming a Work Group (WG) to develop... states in laws, regulations, methods, and testing equipment that comprises the regulatory control of...

  13. Will a Quota Plan for Asylum Seekers Plan Work —and Why Not?

    DEFF Research Database (Denmark)

    Seeberg, Peter

    2015-01-01

    The article describes the recent situation in the Mediterranean, where the number of asylum seekers arriving from countries south and east of the Mediterranean Sea is increasing significantly. The European Commission has suggested a plan, “A European Agenda on Migration”, which will redistribute...... later on lead to a common EU migra-tion policy, which are beyond national control and would make it difficult to avoid responsibilities for internal crisis situations emerging in other parts of the Middle East or North Africa in the future....

  14. Factors affecting planned return to work after trauma: A prospective descriptive qualitative and quantitative study.

    Science.gov (United States)

    Folkard, S S; Bloomfield, T D; Page, P R J; Wilson, D; Ricketts, D M; Rogers, B A

    2016-12-01

    The use of patient reported outcome measures (PROMs) in trauma is limited. The aim of this pilot study is to evaluate qualitative responses and factors affecting planned return to work following significant trauma, for which there is currently a poor evidence base. National ethical approval was obtained for routine prospective PROMs data collection, including EQ-5D, between Sept 2013 and March 2015 for trauma patients admitted to the Sussex Major Trauma Centre (n=92). 84 trauma patients disclosed their intended return to work at discharge. Additional open questions asked 'things done well' and 'things to be improved'. EQ-5D responses were valued using the time trade-off method. Statistical analysis between multiple variables was completed by ANOVA, and with categorical categories by Chi squared analysis. Only 18/68 of patients working at admission anticipated returning to work within 14days post-discharge. The injury severity scores (ISS) of those predicting return to work within two weeks and those predicting return to work longer than two weeks were 14.17 and 13.59, respectively. Increased physicality of work showed a trend towards poorer return to work outcomes, although non-significant in Chi-squared test in groups predicting return in less than or greater than two weeks (4.621, p=0.2017ns). No significant difference was demonstrated in the comparative incomes of patients with different estimated return to work outcomes (ANOVA r 2 =0.001, P=0.9590ns). EQ-5D scores were higher in those predicting return to work within two weeks when compared to greater than two weeks. Qualitative thematic content analysis of open responses was possible for 66/92 of respondents. Prominent positive themes were: care, staff, professionalism, and communication. Prominent negative themes were: food, ward response time, and communication. This pilot study highlights the importance of qualitative PROMs analysis in leading patient-driven improvements in trauma care. We provide standard

  15. Assessment of environmental measures in the Dutch Tax Plan 2008

    International Nuclear Information System (INIS)

    2007-09-01

    The environmental measures that were included in the Dutch Tax plan 2008 have been evaluated for their CO2 effects. In addition, the effects on NOx and PM10 emissions have been quantified. They are the following measures: (1) Environmental differentiation of cars Clean and efficient; (2) Adjustment of addition for private use of company cars; (3) Additional financial burden environment unfriendly fuels/energy; (4) Introduction of air passenger tax (350 million euro) (5) Shift from BPM1 to MRB2; (6) Balancing energy tax for sustainably generated electricity for small consumers; (7) Introduction of packaging tax; (8) Adjustment of the tariff of waste for shredder. The effects of measures 2,7 and 8 have not been assessed by MNP (Netherlands Environmental Assessment Agency). [mk] [nl

  16. RFI/RI work plan for the Road A Chemical Basin 904-111G

    International Nuclear Information System (INIS)

    Kmetz, T.F.

    2000-01-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities

  17. RFI/RI work plan for the Road A Chemical Basin 904-111G

    Energy Technology Data Exchange (ETDEWEB)

    Kmetz, T.F.

    2000-03-07

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.

  18. Building and measuring infrastructure and capacity for community health assessment and health improvement planning in Florida.

    Science.gov (United States)

    Abarca, Christine; Grigg, C Meade; Steele, Jo Ann; Osgood, Laurie; Keating, Heidi

    2009-01-01

    COMPASS (Comprehensive Assessment, Strategic Success) is the Florida Department of Health's community health assessment and health improvement planning initiative. Since 2002, COMPASS built state and county health department infrastructure to support a comprehensive, systematic, and integrated approach to community health assessment and planning. To assess the capacity of Florida's 67 county health departments (CHDs) to conduct community health assessment and planning and to identify training and technical assistance needs, COMPASS surveyed the CHDs using a Web-based instrument annually from 2004 through 2008. Response rate to the survey was 100 percent annually. In 2007, 96 percent of CHDs reported conducting assessment and planning within the past 3 years; 74 percent used the MAPP (Mobilizing for Action through Planning and Partnerships) framework. Progress was greater for the organizational and assessment phases of the MAPP-based work; only 10 CHDs had identified strategic priorities in 2007, and even fewer had implemented strategies for improving health. In 2007, the most frequently requested types of training were measuring success, developing goals and action plans, and using qualitative data; technical assistance was most frequently requested for program evaluation and writing community health status reports. Florida's CHDs have increased their capacity to conduct community health assessment and planning. Questions remain about sustaining these gains with limited resources.

  19. Quadrant I RCRA Facility investigation work plan: Health and safety plan

    International Nuclear Information System (INIS)

    1990-01-01

    This report describes occupational health and safety issues at the Portsmouth Gaseous Diffusion Plant. Health effects from exposure to chemicals, vapors, drilling and sampling activities, as well as from ionizing radiations and protective measures are discussed

  20. Measuring Work Ability with Its Antecedents: Evaluation of the Work Ability Survey.

    Science.gov (United States)

    Voltmer, Jan-Bennet; Deller, Jürgen

    2017-07-24

    Purpose The revised version of the Work Ability Survey (WAS-R) assesses work ability on several sub-scales at the intersection of personal and organizational capacity, thus adding to the measurement of work ability by integrating the holistic model. It, therefore, improves on two features of the current standard measurement tool of work ability, the Work Ability Index (WAI): (1) a ceiling effect and (2) limited detail due to a focus on physical health and personal capacity. Method In two samples (n 1  = 1093, n 2  = 359), psychometric properties and the structure of the WAS-R were analyzed. To evaluate construct validity, inter-correlations of the WAS-R and WAI, sickness absence, expected and desired retirement age, and post-retirement work intention were calculated. Results The WAS-R was found to be distributed closer to normality than the WAI. The structural analyses yielded acceptable results for the hypothesized model. The WAS-R was adequately correlated with the WAI, negatively with sickness absence, and positively with desired retirement age. Conclusions The WAS-R extends the measurement of work ability, reflecting organizations' work demands. Its broad sub-scales lead to high acceptance of the results within the participating companies. In particular, the organizational capacity scales can be used to guide interventions aiming at organizational characteristics to improve work ability.

  1. Measuring physical activity and sedentary behaviour at work: a review.

    Science.gov (United States)

    Castillo-Retamal, Marcelo; Hinckson, Erica A

    2011-01-01

    To identify methods used to assess physical activity and sedentary behaviour at the workplace and review the validity and reliability of these measures. Databases were searched for relevant published articles including MEDLINE, SPORT Discus, ProQuest and Google Scholar. Keywords used were physical-activity, workplace, sedentary-behaviour, measurement and questionnaire. Studies included were original, written in English, published between 1990 and 2009, and focused on validated physical activity and sedentary behaviour measures at work. Eleven papers were identified in which three used criterion standards, three objective measures, and five subjective measures. The most common method of data collection was through self-report, surveys or questionnaires. Physical activity measured with motion sensors, ranged from 4,422 to 10,334 steps/day (pedometers) and sedentary time ranged from 1.8 to 6 hours/day (h/d) (accelerometers). Self-report measures provided information relevant to the perception of physical activity at work (∼ 0.5 h/d), sitting time (> 3 h/d) and calculated energy expenditure (< 800 kcal/d). Physical activity levels at work were low while sedentary behaviour was high. This was largely a function of occupation (white-collar vs. blue-collar). None of the studies assessed validity or reliability of measures used however, instruments as assessed by others showed moderate to strong validity and reliability values.

  2. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  3. Role of working memory components in planning performance of individuals with Parkinson's disease

    NARCIS (Netherlands)

    Altgassen, A.M.; Phillips, L.H.; Kopp, U.; Kliegel, M.

    2007-01-01

    The current study investigated the involvement of all four components of Baddeley's [Baddeley, A. D. (2000). The episodic buffer: A new component of working memory? Trends in Cognitive Sciences, 4, 417–423] revised working memory model in deficits of planning accompanying Parkinson's disease (PD).

  4. Employees' intentions to retire early : a case of planned behavior and anticipated work conditions

    NARCIS (Netherlands)

    van Dam, Karen; van der Vorst, Janine D.M.; van der Heijden, Beatrice

    2009-01-01

    This study investigated the early retirement intentions of 346 older Dutch employees by extending the theory of planned behavior with anticipated work conditions. The results showed that employees who felt a pressure from their spouse to retire early had a strong intention to leave the work force

  5. Understanding work-related social media use: An extension of theory of planned behavior.

    NARCIS (Netherlands)

    van Zoonen, W.; Verhoeven, J.W.M.; Elving, W.J.L.

    2014-01-01

    This study examines the motives of employees to engage in work related social media use - i.e. the use of personal social media accounts to communicate about work-related issues. The theory of planned behavior (TPB) was used to explain this behavior. Because social media can enable users to express

  6. MEASURING WORKING HOURS INPUT IN VINE GROWING AT WORK ORGANIZATION BASED ON PHENOLOGICAL PHASES

    Directory of Open Access Journals (Sweden)

    J BRAZSIL

    2002-05-01

    Full Text Available Research was based on phenological phases of Italian Riesling, involving differences in labour and financial input for dry, optimal and wet weather. Worktime demand for certain operations in vine growing was determined with an analytic method, work day survey and We worked out alternatives for dry, optimum and wet weather on the basis of phenological phaseses. The worktime demand for the phenological phases with all their operations were analysed and planned in an itemized way based on our findings. We used them to work out the worktime demand for the given vine land for each operation. To analyse differences coming from diverse methods of cultivation and spacing, the material, operational and total costs of hand and mechanized labour were projected for 1 hectare and variance analysis was made.

  7. Measures of safeguard and rehabilitation for landscape protection planning: a qualitative approach based on diversity indicators.

    Science.gov (United States)

    La Rosa, Daniele; Privitera, Riccardo; Martinico, Francesco; La Greca, Paolo

    2013-09-01

    Maintaining existing levels of landscape diversity is becoming more and more important for planning considering the increasing pressures on agricultural ecosystems due to soil sealing, sprawl processes and intensive agriculture. Norms for land-use regulation and measures for landscape Safeguard and Rehabilitation have to take into consideration these threats in landscape planning. Evaluating the diversity of agricultural ecosystems is a fundamental step for proposing sound approaches to planning and managing both soil and landscape, as well as maintaining the related ecosystem services. The paper proposes a method aimed at the qualitative evaluation of spatial diversity of agricultural landscapes using a reduced set of ecological indicators based on land-use vector data. Indicators are calculated for defined landscape units characterized by landscape homogeneity. GIS geoprocessing and spatial analysis functions are employed. The study area is the Province of Enna in Sicily (Italy), which is characterized by cultivation mosaics in its southern region, cereal cultivation in the central region and prevailing natural environments in the northern region. Results from the indicator calculations are used to define measures to be included in a Landscape Protection Plan. Safeguard and Rehabilitation measures are introduced, which link indicator scores to planning protection aims. The results highlight the relevance of some agricultural mosaics in proximity to streams and seasonal fluvial environments, where some undamaged natural environments are still present. For these areas, specific landscape safeguard measures are proposed to preserve their diversity features together with their original agricultural functions. The work shows that even with a reduced number of indicators, a differentiated set of measures can be proposed for a Landscape Protection Plan. Copyright © 2013 Elsevier Ltd. All rights reserved.

  8. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  9. Measurement of Static Characteristics Pneumatic Motors with Elastic Working Elements

    Directory of Open Access Journals (Sweden)

    Kamil FOJTÁŠEK

    2012-06-01

    Full Text Available Into a category of pneumatic motors with elastic working parts belong air bellows, diaphragm motors and fluid muscles. All three types of these motors have some elastic part usually made of rubber. This part is deformed under the pressure of a compressed air or a mass load resulting in a final working effect. This paper deals with measuring of static characteristics of these motors.

  10. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods

  11. Fission neutron spectra measurements at LANSCE - Status and plans

    International Nuclear Information System (INIS)

    Haight, R. C.; Noda, S.; Nelson, R. O.; O'Donnell, J. M.; Devlin, M.; Chatillon, A.; Granier, T.; Taiebb, J.; Laurent, B.; Belier, G.; Becker, J. A.; Wu, C. Y.

    2010-01-01

    A program to measure fission neutron spectra from neutron-induced fission of actinides is underway at the Los Alamos Neutron Science Center (LANSCE) in a collaboration among the CEA laboratory at Bruyeres-le-Chatel, Lawrence Livermore National Laboratory and Los Alamos National Laboratory. The spallation source of fast neutrons at LANSCE is used to provide incident neutron energies from less than 1 MeV to 100 MeV or higher. The fission events take place in a gas-ionization fission chamber, and the time of flight from the neutron source to that chamber gives the energy of the incident neutron. Outgoing neutrons are detected by an array of organic liquid scintillator neutron detectors, and their energies are deduced from the time of flight from the fission chamber to the neutron detector. Measurements have been made of the fission neutrons from fission of 235 U, 238 U, 237 Np and 239 Pu. The range of outgoing energies measured so far is from 0.7 MeV to approximately 8 MeV. These partial spectra and average fission neutron energies are compared with evaluated data and with models of fission neutron emission. Results to date are summarized in this presentation. Future plans are to make significant improvements in the fission chambers, neutron detectors, signal processing, data acquisition and the experimental environment to provide high fidelity data including measurements of fission neutrons below 0.7 MeV and improvements in the data above 8 MeV. (authors)

  12. Improvement of the plan of measures for cases of catastrophes corresponding to radiological accidents

    International Nuclear Information System (INIS)

    Jerez Vegueria, Pablo F.; Lopez Forteza; Yamil; Diaz Guerra, Pedro I.

    2003-01-01

    In the year 1988 the Plan of Measures for Cases of Catastrophe (PMCC) it was focused basically to the Central Electronuclear of Juragua and the Center of Investigations Nuclear both in construction in that moment. In Cuba, with the Ordinance Law Not. 170 of the System of Civil Defense of 1997 assign the EMNDC the responsibility for the address and coordination of the material resources and humans to make in front of any catastrophe type, including the emergencies radiological. However the radiological events that could happen in rest of those practical with ionizing radiations that were carried out in the country they were not contemplated in the old conception of planning of emergency of the PMCC. In the year 2001 the CNSN and EMNDC begin a revision of the national planning from the answer to radiological emergencies developing new conceptions of planning, preparation and answer to radiological emergencies using for it categories of planning recommended by the IAEA in new technical documents emitted to the effect. Presently work is exposed the new philosophy of planning and national answer that it sustains the current Annex radiological Accidents of the PMCC

  13. Food Parenting Measurement Issues: Working Group Consensus Report

    OpenAIRE

    Hughes, Sheryl O.; Frankel, Leslie A.; Beltran, Alicia; Hodges, Eric; Hoerr, Sharon; Lumeng, Julie; Tovar, Alison; Kremers, Stef

    2013-01-01

    Childhood obesity is a growing problem. As more researchers become involved in the study of parenting influences on childhood obesity, there appears to be a lack of agreement regarding the most important parenting constructs of interest, definitions of those constructs, and measurement of those constructs in a consistent manner across studies. This article aims to summarize findings from a working group that convened specifically to discuss measurement issues related to parental influences on...

  14. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    Science.gov (United States)

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout

  15. Part-time work as a pre-retirement measure

    CERN Document Server

    HR Department

    2006-01-01

    Following discussion at the Standing Concertation Committee at its meeting on 7 December 2006, the Director-General has approved the extension of the Part-time work scheme as a pre-retirement measure for the year 2007, i.e. until 31 December 2007. Human Resources Department Tel. 72808/74128

  16. Part-time work as a pre-retirement measure

    CERN Multimedia

    HR Department

    2007-01-01

    Following discussion at the Standing Concertation Committee at its meeting on 2 November 2007, the Director-General has approved the extension of the part-time work scheme as a pre-retirement measure for the year 2008, i.e. until 31 December 2008. Human Resources Department Tel. 74484/73903

  17. Effects of Methylphenidate on Working Memory Components: Influence of Measurement

    Science.gov (United States)

    Bedard, Anne-Claude; Jain, Umesh; Hogg-Johnson, Sheilah; Tannock, Rosemary

    2007-01-01

    Background: To investigate the effects of methylphenidate (MPH) on components of working memory (WM) in attention-deficit hyperactivity disorder (ADHD) and determine the responsiveness of WM measures to MPH. Methods: Participants were a clinical sample of 50 children and adolescents with ADHD, aged 6 to 16 years old, who participated in an acute…

  18. Employability Skills Assessment: Measuring Work Ethic for Research and Learning

    Science.gov (United States)

    Park, HwaChoon; Hill, Roger B.

    2016-01-01

    The Employability Skills Assessment (ESA) was developed by Hill (1995) to provide an alternative measure of work ethic needed for success in employment. This study tested goodness-of-fit for a model used to interpret ESA results. The model had three factors: interpersonal skills, initiative, and dependability. Confirmatory factor analysis results…

  19. Coping and return to work: Measurement and theoretical issues

    Directory of Open Access Journals (Sweden)

    Magnus Odéen

    2010-01-01

    Full Text Available Sick leave and early departure from the workforce have serious adverse effects on both individuals and society. Motivation and coping are both important when attempting to return to work. In this article, we wanted to test if either of two coping instruments could predict return to work. Response outcome expectancies as defined in the Cognitive Activation Theory of Stress (CATS (Ursin & Eriksen, 2004 were measured by the CODE scale (Eriksen et al., 1997 and general self-efficacy was measured by the generalized self-efficacy scale (GSE (Schwarzer & Jerusalem, 1995. The instruments were tested in one group of rehabilitation patients (N= 135 and one group of disability pensioners (N=85, who participated in return to work interventions in randomised controlled trials. None of the instruments could predict return to work at any point of measurement. Less than 10% of the theoretical range of the scales was used. The scales appear to measure a concept that is more stable than their underlying theory predicts, and they can not predict an important outcome. Results indicate that caution is advised when making inferences from  these instruments to their underlying theories.

  20. Study On Safeguard Measures for Implementing Overall Planning of Land Use

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Based on minutely analysing the main problems existing in safeguard measures for implementing a new round of overall planning of land use,this paper constructs implementation security system of overall planning of land use,and puts forward the principles and basis of formulating safeguard measures for implementing overall planning of land use.Finally,this paper establishes the content system of safeguard measures:effectively strengthen social supervision;strengthen administrative management of land use planning;strengthen economic management of land use planning;reinforce the legal status of planning;establish incentive and constraint mechanism for reinforcing implementation;improve support system of planning.

  1. Activity plan: Directional drilling and environmental measurements while drilling

    International Nuclear Information System (INIS)

    Myers, D.A.

    1998-01-01

    This activity plan describes the testing of directional drilling combined with environmental measurements while drilling at two Hanford Site locations. A cold test is to be conducted at the 105A Mock Tank Leak Facility in the 200 East Area. A hot test is proposed to be run at the 216-B-8 tile field north of the 241-B Tank Farm in 200 East Area. Criteria to judge the success, partial success or failure of various aspects of the test are included. The TWRS program is assessing the potential for use of directional drilling because of an identified need to interrogate the vadose zone beneath the single-shell tanks. Because every precaution must be taken to assure that investigation activities do not violate the integrity of the tanks, control of the drill bit and ability to follow a predetermined drill path are of utmost importance and are being tested

  2. Activity plan: Directional drilling and environmental measurements while drilling

    Energy Technology Data Exchange (ETDEWEB)

    Myers, D.A.

    1998-07-16

    This activity plan describes the testing of directional drilling combined with environmental measurements while drilling at two Hanford Site locations. A cold test is to be conducted at the 105A Mock Tank Leak Facility in the 200 East Area. A hot test is proposed to be run at the 216-B-8 tile field north of the 241-B Tank Farm in 200 East Area. Criteria to judge the success, partial success or failure of various aspects of the test are included. The TWRS program is assessing the potential for use of directional drilling because of an identified need to interrogate the vadose zone beneath the single-shell tanks. Because every precaution must be taken to assure that investigation activities do not violate the integrity of the tanks, control of the drill bit and ability to follow a predetermined drill path are of utmost importance and are being tested.

  3. The importance of work or productive activity in life care planning and case management

    Science.gov (United States)

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    Abstract INTRODUCTION: The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. BACKGROUND: The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. PURPOSE: The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. CONCLUSION: Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities. PMID:26409330

  4. The importance of work or productive activity in life care planning and case management.

    Science.gov (United States)

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities.

  5. Sectored Clean-up Work Plan for Housekeeping Category Waste Sites

    International Nuclear Information System (INIS)

    Nacht, S. J.

    2000-01-01

    The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs

  6. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  7. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  8. Measuring individual work performance: identifying and selecting indicators.

    Science.gov (United States)

    Koopmans, Linda; Bernaards, Claire M; Hildebrandt, Vincent H; de Vet, Henrica C W; van der Beek, Allard J

    2014-01-01

    Theoretically, individual work performance (IWP) can be divided into four dimensions: task performance, contextual performance, adaptive performance, and counterproductive work behavior. However, there is no consensus on the indicators used to measure these dimensions. This study was designed to (1) identify indicators for each dimension, (2) select the most relevant indicators, and (3) determine the relative weight of each dimension in ratings of work performance. IWP indicators were identified from multiple research disciplines, via literature, existing questionnaires, and expert interviews. Subsequently, experts selected the most relevant indicators per dimension and scored the relative weight of each dimension in ratings of IWP. In total, 128 unique indicators were identified. Twenty-three of these indicators were selected by experts as most relevant for measuring IWP. Task performance determined 36% of the work performance rating, while the other three dimensions respectively determined 22%, 20% and 21% of the rating. Notable consensus was found on relevant indicators of IWP, reducing the number from 128 to 23 relevant indicators. This provides an important step towards the development of a standardized, generic and short measurement instrument for assessing IWP.

  9. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  10. Free energy surfaces from nonequilibrium processes without work measurement

    Science.gov (United States)

    Adib, Artur B.

    2006-04-01

    Recent developments in statistical mechanics have allowed the estimation of equilibrium free energies from the statistics of work measurements during processes that drive the system out of equilibrium. Here a different class of processes is considered, wherein the system is prepared and released from a nonequilibrium state, and no external work is involved during its observation. For such "clamp-and-release" processes, a simple strategy for the estimation of equilibrium free energies is offered. The method is illustrated with numerical simulations and analyzed in the context of tethered single-molecule experiments.

  11. Explicit optimization of plan quality measures in intensity-modulated radiation therapy treatment planning.

    Science.gov (United States)

    Engberg, Lovisa; Forsgren, Anders; Eriksson, Kjell; Hårdemark, Björn

    2017-06-01

    To formulate convex planning objectives of treatment plan multicriteria optimization with explicit relationships to the dose-volume histogram (DVH) statistics used in plan quality evaluation. Conventional planning objectives are designed to minimize the violation of DVH statistics thresholds using penalty functions. Although successful in guiding the DVH curve towards these thresholds, conventional planning objectives offer limited control of the individual points on the DVH curve (doses-at-volume) used to evaluate plan quality. In this study, we abandon the usual penalty-function framework and propose planning objectives that more closely relate to DVH statistics. The proposed planning objectives are based on mean-tail-dose, resulting in convex optimization. We also demonstrate how to adapt a standard optimization method to the proposed formulation in order to obtain a substantial reduction in computational cost. We investigated the potential of the proposed planning objectives as tools for optimizing DVH statistics through juxtaposition with the conventional planning objectives on two patient cases. Sets of treatment plans with differently balanced planning objectives were generated using either the proposed or the conventional approach. Dominance in the sense of better distributed doses-at-volume was observed in plans optimized within the proposed framework. The initial computational study indicates that the DVH statistics are better optimized and more efficiently balanced using the proposed planning objectives than using the conventional approach. © 2017 American Association of Physicists in Medicine.

  12. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2001-01-01

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  13. Calibration Plans for the Global Precipitation Measurement (GPM)

    Science.gov (United States)

    Bidwell, S. W.; Flaming, G. M.; Adams, W. J.; Everett, D. F.; Mendelsohn, C. R.; Smith, E. A.; Turk, J.

    2002-01-01

    The Global Precipitation Measurement (GPM) is an international effort led by the National Aeronautics and Space Administration (NASA) of the U.S.A. and the National Space Development Agency of Japan (NASDA) for the purpose of improving research into the global water and energy cycle. GPM will improve climate, weather, and hydrological forecasts through more frequent and more accurate measurement of precipitation world-wide. Comprised of U.S. domestic and international partners, GPM will incorporate and assimilate data streams from many spacecraft with varied orbital characteristics and instrument capabilities. Two of the satellites will be provided directly by GPM, the core satellite and a constellation member. The core satellite, at the heart of GPM, is scheduled for launch in November 2007. The core will carry a conical scanning microwave radiometer, the GPM Microwave Imager (GMI), and a two-frequency cross-track-scanning radar, the Dual-frequency Precipitation Radar (DPR). The passive microwave channels and the two radar frequencies of the core are carefully chosen for investigating the varying character of precipitation over ocean and land, and from the tropics to the high-latitudes. The DPR will enable microphysical characterization and three-dimensional profiling of precipitation. The GPM-provided constellation spacecraft will carry a GMI radiometer identical to that on the core spacecraft. This paper presents calibration plans for the GPM, including on-board instrument calibration, external calibration methods, and the role of ground validation. Particular emphasis is on plans for inter-satellite calibration of the GPM constellation. With its Unique instrument capabilities, the core spacecraft will serve as a calibration transfer standard to the GPM constellation. In particular the Dual-frequency Precipitation Radar aboard the core will check the accuracy of retrievals from the GMI radiometer and will enable improvement of the radiometer retrievals

  14. Effects of curriculum-based measurement on teachers' instructional planning.

    Science.gov (United States)

    Fuchs, L S; Fuchs, D; Stecker, P M

    1989-01-01

    This study assessed the effects of curriculum-based measurement (CBM) on teachers' instructional planning. Subjects were 30 teachers, assigned randomly to a computer-assisted CBM group, a noncomputer CBM group, and a contrast group. In the CBM groups, teachers specified 15-week reading goals, established CBM systems to measure student progress toward goals at least twice weekly, and systematically evaluated those data bases to determine when instructional modifications were necessary. Contrast teachers monitored student progress toward Individualized Education Program (IEP) goals as they wished and were encouraged to develop instructional programs as necessary. At the end of a 12- to 15-week implementation period, teachers completed a questionnaire with reference to one randomly selected pupil. Analyses of variance indicated no difference between the CBM groups. However, compared to the contrast group, CBM teachers (a) used more specific, acceptable goals; (b) were less optimistic about goal attainment; (c) cited more objective and frequent data sources for determining the adequacy of student progress and for deciding whether program modifications were necessary; and (d) modified student programs more frequently. Questionnaire responses were correlated with verifiable data sources, and results generally supported the usefulness of the self-report information. Implications for special education research and practice are discussed.

  15. Demonstration testing and evaluation of in situ soil heating. Treatability study work plan, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sresty, G.C.

    1994-07-07

    A Treatability Study planned for the demonstration of the in situ electromagnetic (EM) heating process to remove organic solvents is described in this Work Plan. The treatability study will be conducted by heating subsurface vadose-zone soils in an organic plume adjacent to the Classified Burial Ground K-1070-D located at K-25 Site, Oak Ridge. The test is scheduled to start during the fourth quarter of FY94 and will be completed during the first quarter of FY95. The EM heating process for soil decontamination is based on volumetric heating technologies developed during the `70s for the recovery of fuels from shale and tar sands by IIT Research Institute (IITRI) under a co-operative program with the US Department of Energy (DOE). Additional modifications of the technology developed during the mid `80s are currently used for the production of heavy oil and waste treatment. Over the last nine years, a number of Government agencies (EPA, Army, AF, and DOE) and industries sponsored further development and testing of the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site under the proposed treatability study. Most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85 to 95 C. The efficiency of the treatment will be determined by comparing the concentration of contaminants in soil samples. Samples will be obtained before and after the demonstration for a measurement of the concentration of contaminants of concern.

  16. Prediction of work metabolism from heart rate measurements in forest work: some practical methodological issues.

    Science.gov (United States)

    Dubé, Philippe-Antoine; Imbeau, Daniel; Dubeau, Denise; Auger, Isabelle; Leone, Mario

    2015-01-01

    Individual heart rate (HR) to workload relationships were determined using 93 submaximal step-tests administered to 26 healthy participants attending physical activities in a university training centre (laboratory study) and 41 experienced forest workers (field study). Predicted maximum aerobic capacity (MAC) was compared to measured MAC from a maximal treadmill test (laboratory study) to test the effect of two age-predicted maximum HR Equations (220-age and 207-0.7 × age) and two clothing insulation levels (0.4 and 0.91 clo) during the step-test. Work metabolism (WM) estimated from forest work HR was compared against concurrent work V̇O2 measurements while taking into account the HR thermal component. Results show that MAC and WM can be accurately predicted from work HR measurements and simple regression models developed in this study (1% group mean prediction bias and up to 25% expected prediction bias for a single individual). Clothing insulation had no impact on predicted MAC nor age-predicted maximum HR equations. Practitioner summary: This study sheds light on four practical methodological issues faced by practitioners regarding the use of HR methodology to assess WM in actual work environments. More specifically, the effect of wearing work clothes and the use of two different maximum HR prediction equations on the ability of a submaximal step-test to assess MAC are examined, as well as the accuracy of using an individual's step-test HR to workload relationship to predict WM from HR data collected during actual work in the presence of thermal stress.

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  18. Senior dental students' career intentions, work-life balance and retirement plans.

    Science.gov (United States)

    Stewart, F M J; Drummond, J R; Carson, L; Theaker, E D

    2007-09-08

    To gather information from senior dental students about their future career plans, with particular emphasis on work-life balance issues, their attitudes towards the NHS and retirement plans. Senior dental students at the Universities of Dundee and Manchester were asked to complete a voluntary anonymous questionnaire. In all 141 questionnaires were completed, 42 by students in Manchester and 114 in Dundee. On qualification nearly all surveyed intend to work full time but after five years one quarter (26%) of females intend to work part time. This is significantly (p work full time. Although the majority (65%) intend to work in general practice significant numbers (19%) wish to have a career in hospital dentistry and very few (3%) in community dentistry. Senior students seem to show no more commitment to the NHS than those in our previous study of dental school applicants. Only 3% intend to work exclusively for the NHS and 18% intend to work exclusively in the private sector. Surprising numbers had plans to retire or go part time before 60 years of age. Only 20% of the sample intended to continue working full time after the age of 60 years. The mode age that those surveyed intended to start a family was 30 years and a large majority of both sexes thought this would interrupt their professional life. More than half of the sample intend to take time out of dentistry until their children attended primary school (female 63%, male 38%) and 6% (female 6%, male 8%) until secondary school. Many of our findings suggest that future generations of dentists may have a pattern of professional life that will have the effect of reducing their clinical commitment, although it is not possible to determine how significant an effect this will have on the workforce. It may, however, be appropriate to take career intention into account when workforce planning.

  19. Draft Level 1 Remedial Investigation Work Plan: 316-3 waste disposal trenches

    International Nuclear Information System (INIS)

    1987-09-01

    This work plan describes the work to be performed for the initial level of site characterization for the 316.3 Trenches at the Hanford Site. This initial site characterization effort will include a review of existing environmental contamination data for the 300 Area as well as collection and analysis of environmental samples to better characterize subsurface contamination at the site. 7 refs., 10 figs., 7 tabs

  20. Satisfaction with work-life balance and the career and retirement plans of US oncologists.

    Science.gov (United States)

    Shanafelt, Tait D; Raymond, Marilyn; Kosty, Michael; Satele, Daniel; Horn, Leora; Pippen, John; Chu, Quyen; Chew, Helen; Clark, William Benton; Hanley, Amy E; Sloan, Jeff; Gradishar, William J

    2014-04-10

    To evaluate satisfaction with work-life balance (WLB) and career plans of US oncologists. The American Society of Clinical Oncology conducted a survey of US oncologists evaluating satisfaction with WLB and career plans between October 2012 and March 2013. The sample included equal numbers of men and women from all career stages. Of 2,998 oncologists contacted, 1,490 (49.7%) returned surveys. From 1,117 oncologists (37.3% of overall sample) completing full-length surveys, we evaluated satisfaction with WLB and career plans among the 1,058 who were not yet retired. The proportion of oncologists satisfied with WLB (n = 345; 33.4%) ranked lower than that reported for all other medical specialties in a recent national study. Regarding career plans, 270 oncologists (26.5%) reported a moderate or higher likelihood of reducing their clinical work hours in the next 12 months, 351 (34.3%) indicated a moderate or higher likelihood of leaving their current position within 24 months, and 273 (28.5%) planned to retire before 65 years of age. Multivariable analyses found women oncologists (odds ratio [OR], 0.458; P hour, 0.977; P work hours and leave current position on multivariable analysis. Satisfaction with WLB among US oncologists seems lower than for other medical specialties. Dissatisfaction with WLB shows a strong relationship with plans to reduce hours and leave current practice. Given the pending US oncologist shortage, additional studies exploring interactions among WLB, burnout, and career satisfaction and their impact on career and retirement plans are warranted.

  1. Measurement and evaluation of national family planning programs.

    Science.gov (United States)

    Mauldin, W P

    1967-03-01

    ) segura de traducir las estadísticas de servicio en práticas y tal vez aún datos sobre suministro comercial en datos sabre tasas de natalidad. Esto incluye, par ejemplo, los esfuerzos para consolidar observaciones coma "cinco años-mujer de usa de IUD, a 400 condones equivalen a la prevención de un nacimiento," y esfuerzos como los de Pakistán de calcular tasas coma "años de protección de una pareja contra el embarazo."In the belief that a decrease in the rate of population growth will increase economic development, more than ten countries have inaugurated family planning programs in the past fifteen years. To provide a model for measuring the immediate, intermediate, and long-term effects of any such program, the authors use the Taiwan evaluation.The model suggests that a good system of evaluation should include monthly statistics on (1) participants, who are grouped by characteristics; (2) the distribution of supplies, reported at first by the characteristics of recipients, but after by gross volume only; (3) family planning activities of private physicians to measure the catalytic effect on the private sector; (4) new contacts and amount of advertising in mass media; (5) costs broken down by areas and by cost categories; and (6) distribution of commercial supplies. In addition, the program should conduct 300-400 interviews every 6-12 months to learn the rates of continuation and the rates and reasons for discontinuation. Finally, a KAP survey should be conducted every two years.The administration of the evaluation should be close to the director for policy decisions and for the ultimate work of evaluation-the finding of new ways to measure the main goal of change in fertility by the translation of statistics on Services provided and commercial supplies into birth rate data.

  2. Fission neutron spectra measurements at LANSCE - status and plans

    International Nuclear Information System (INIS)

    Haight, Robert C.; Noda, Shusaku; Nelson, Ronald O.; O' Donnell, John M.; Devlin, Matt; Chatillon, Audrey; Granier, Thierry; Taieb, Julien; Laurent, Benoit; Belier, Gilbert; Becker, John A.; Wu, Ching-Yen

    2009-01-01

    A program to measure fission neutron spectra from neutron-induced fission of actinides is underway at the Los Alamos Neutron Science Center (LANSCE) in a collaboration among the CEA laboratory at Bruyeres-le-Chatel, Lawrence Livermore National Laboratory and Los Alamos National Laboratory. The spallation source of fast neutrons at LANSCE is used to provide incident neutron energies from less than 1 MeV to 100 MeV or higher. The fission events take place in a gas-ionization fission chamber, and the time of flight from the neutron source to that chamber gives the energy of the incident neutron. Outgoing neutrons are detected by an array of organic liquid scintillator neutron detectors, and their energies are deduced from the time of flight from the fission chamber to the neutron detector. Measurements have been made of the fission neutrons from fission of 235 U, 238 U, 237 Np and 239 Pu. The range of outgoing energies measured so far is from 1 MeV to approximately 8 MeV. These partial spectra and average fission neutron energies are compared with evaluated data and with models of fission neutron emission. Results to date will be presented and a discussion of uncertainties will be given in this presentation. Future plans are to make significant improvements in the fission chambers, neutron detectors, signal processing, data acquisition and the experimental environment to provide high fidelity data including mea urements of fission neutrons below 1 MeV and improvements in the data above 8 MeV.

  3. The Role of Working Memory in Planning and Generating Written Sentences

    Directory of Open Access Journals (Sweden)

    Ronald T. Kellogg

    2016-02-01

    Full Text Available Planning a sentence with concrete concepts whose referents can be mentally imaged has been shown in past work to require the limited resources of visual working memory. By contrast, grammatically encoding such concepts as lexical items in a syntactic structure requires verbal working memory. We report an experiment designed to demonstrate a double dissociation of these two stores of working memory by manipulating the difficulty of (1 planning by comparing related concepts to unrelated concepts and (2 grammatical encoding of an English sentence in active voice versus the more complex structure of the passive voice. College students (N = 46 composed sentences that were to include two noun prompts (related versus unrelated while concurrently performing either a visual or a verbal distracting task. Instructions to produce either active or passive sentences were manipulated between groups. The results surprisingly indicated that the supposedly easier planning with related concepts made a large demand on verbal working memory, rather than unrelated concepts demanding more visual working memory. The temporal dynamics of the sentence production process appear to best account for the unexpected findings.

  4. Analogy between gambling and measurement-based work extraction

    Science.gov (United States)

    Vinkler, Dror A.; Permuter, Haim H.; Merhav, Neri

    2016-04-01

    In information theory, one area of interest is gambling, where mutual information characterizes the maximal gain in wealth growth rate due to knowledge of side information; the betting strategy that achieves this maximum is named the Kelly strategy. In the field of physics, it was recently shown that mutual information can characterize the maximal amount of work that can be extracted from a single heat bath using measurement-based control protocols, i.e. using ‘information engines’. However, to the best of our knowledge, no relation between gambling and information engines has been presented before. In this paper, we briefly review the two concepts and then demonstrate an analogy between gambling, where bits are converted into wealth, and information engines, where bits representing measurements are converted into energy. From this analogy follows an extension of gambling to the continuous-valued case, which is shown to be useful for investments in currency exchange rates or in the stock market using options. Moreover, the analogy enables us to use well-known methods and results from one field to solve problems in the other. We present three such cases: maximum work extraction when the probability distributions governing the system and measurements are unknown, work extraction when some energy is lost in each cycle, e.g. due to friction, and an analysis of systems with memory. In all three cases, the analogy enables us to use known results in order to obtain new ones.

  5. Phonological and Executive Working Memory in L2 Task-Based Speech Planning and Performance

    Science.gov (United States)

    Wen, Zhisheng

    2016-01-01

    The present study sets out to explore the distinctive roles played by two working memory (WM) components in various aspects of L2 task-based speech planning and performance. A group of 40 post-intermediate proficiency level Chinese EFL learners took part in the empirical study. Following the tenets and basic principles of the…

  6. Students Working Online for Group Projects: A Test of an Extended Theory of Planned Behaviour Model

    Science.gov (United States)

    Cheng, Eddie W. L.

    2017-01-01

    This study examined an extended theory of planned behaviour (TPB) model that specified factors affecting students' intentions to collaborate online for group work. Past behaviour, past experience and actual behavioural control were incorporated in the extended TPB model. The mediating roles of attitudes, subjective norms and perceived behavioural…

  7. 76 FR 14995 - Comment Request for Information Collection for Work-Flex Plan Submission and Reporting...

    Science.gov (United States)

    2011-03-18

    ... ensure that requested data can be provided in the desired format, reporting burden (time and financial... DEPARTMENT OF LABOR Comment Request for Information Collection for Work-Flex Plan Submission and Reporting Requirements; Extension With Revisions AGENCY: Employment and Training Administration, DOL. ACTION...

  8. Work plan for waste receiving and processing module 2A waste characterization study

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-11-01

    This WRAP 2A Waste Characterization Study effort addresses those certification strategy functions related to characterization by defining criteria associated with each function, identifying administrative and design mechanisms for accomplishing each of these functions and evaluating alternatives where applicable. This work plan provides direction for completing the study

  9. The Interplay between Women's Life Course Work Patterns and Financial Planning for Later Life

    Science.gov (United States)

    Berger, Ellie D.; Denton, Margaret A.

    2004-01-01

    In order to gain a comprehensive understanding of the interplay between women's life course work patterns and their financial planning for later life, we examined data from semi-structured interviews with retired women (n = 28) aged 59 to 92. The majority of women disrupted their careers at some point in time, for an average of 14 years, primarily…

  10. Work climate and work load measurement in production room of Batik Merak Manis Laweyan

    Science.gov (United States)

    Suhardi, Bambang; Simanjutak, Sry Yohana; Laksono, Pringgo Widyo; Herjunowibowo, Dewanto

    2017-11-01

    The work environment is everything around the labours that can affect them in the exercise of duties and work that is charged. In a work environment, there are workplace climate and workload which affect the labour in force carrying out its work. The working climate is one of the physical factors that could potentially cause health problems towards labour at extreme conditions of hot and cold that exceed the threshold limit value allowed by the standards of health. The climate works closely related to the workload accepted by workers in the performance of their duties. The influence of workload is pretty dominant against the performance of human resources and may cause negative effects to the safety and health of the labours. This study aims to measure the effect of the work climate and the workload against workers productivity. Furthermore, some suggestions to increase the productivity also been recommended. The research conducted in production room of Batik Merak Manis Laweyan. The results showed that the workplace climate and the workload at eight stations in production room of Merak Manis does not agree to the threshold limit value that has been set. Therefore, it is recommended to add more opening windows to add air velocity inside the building thus the humidity and temperature might be reduced.

  11. The Work Design Questionnaire (WDQ): Developing and Validating a Comprehensive Measure for Assessing Job Design and the Nature of Work

    Science.gov (United States)

    Morgeson, Frederick P.; Humphrey, Stephen E.

    2006-01-01

    Although there are thousands of studies investigating work and job design, existing measures are incomplete. In an effort to address this gap, the authors reviewed the work design literature, identified and integrated previously described work characteristics, and developed a measure to tap those work characteristics. The resultant Work Design…

  12. Iran's Health Reform Plan: Measuring Changes in Equity Indices.

    Science.gov (United States)

    Assari Arani, Abbas; Atashbar, Tohid; Antoun, Joseph; Bossert, Thomas

    2018-03-01

    Two years after the implementation of the Health Sector Evolution Plan (HSEP), this study evaluated the effects of the plan on health equity indices. The main indices assessed by the study were the Out-of-Pocket (OOP) health expenditures, the Fairness in Financial Contribution (FFC) to the health system index, the index of households' Catastrophic Health Expenditure (CHE) and the headcount ratio of Impoverishing Health Expenditure (IHE). The per capita share of costs for total health services has been decreased. The lowered costs have been more felt in rural areas, generally due to sharp decrease in inpatient costs. Per capita pay for outpatient services is almost constant or has slightly increased. The reform plan has managed to improve households' Catastrophic Health Expenditure (CHE) index from an average of 2.9% before the implementation of the plan to 2.3% after the plan. The Fairness in Financial Contribution (FFC) to the health system index has worsened from 0.79 to 0.76, and the headcount ratio of Impoverishing Health Expenditure (IHE) index deteriorated after the implementation of plan from 0.34 to 0.50. Considerable improvement, in decreasing the burden of catastrophic hospital costs in low income strata which is about 26% relative to the time before the implementation of the plan can be regarded as the main achievement of the plan, whereas the worsening in the headcount ratio of IHE and FFC are the equity bottlenecks of the plan.

  13. Hospital nurses' work environment, quality of care provided and career plans.

    Science.gov (United States)

    Hinno, S; Partanen, P; Vehviläinen-Julkunen, K

    2011-06-01

    In several European countries, the availability of qualified nurses is insufficient to meet current healthcare requirements. Nurses are highly dissatisfied with the rising demands of the healthcare environment and increasingly considering leaving their jobs. The study aims to investigate the relationships between the characteristics of hospital nurses' work environment and the quality of care provided, and furthermore to examine Dutch nurses' career plans. A cross-sectional, questionnaire survey of registered nurses (n = 334) working in the academic and district hospitals was conducted in 2005/2006. Previously validated questionnaires translated into the participants' language were used. Factor and regression analysis were used for data analysis. Overall, nurses rated their work environment rather favourably. Five work environment characteristics were identified: support for professional development, adequate staffing, nursing competence, supportive management and teamwork. Significant relationships were found between nurses' perceptions of their work environment characteristics and quality of care provided and nurses' career plans. When work environment characteristics were evaluated to be better, nurse-assessed quality of care also increased and intentions to leave current job decreased linearly. Study findings suggest that nurses' perceptions of their work environment are important for nurse outcomes in hospital settings. Further research is needed to explore the predictive ability of the work environment for nurse, patient and organizational outcomes in hospitals. © 2011 The Authors. International Nursing Review © 2011 International Council of Nurses.

  14. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    Science.gov (United States)

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  15. Science Plan for the Atmospheric Radiation Measurement Program (ARM)

    International Nuclear Information System (INIS)

    1996-02-01

    The purpose of this Atmospheric Radiation Measurement (ARM) Science Plan is to articulate the scientific issues driving the ARM Program, and to relate them to DOE's programmatic objectives for ARM, based on the experience and scientific progress gained over the past five years. ARM programmatic objectives are to: (1) Relate observed radiative fluxes and radiances in the atmosphere, spectrally resolved and as a function of position and time, to the temperature and composition of the atmosphere, specifically including water vapor and clouds, and to surface properties, and sample sufficient variety of situations so as to span a wide range of climatologically relevant possibilities; (2) develop and test parameterizations that can be used to accurately predict the radiative properties and to model the radiative interactions involving water vapor and clouds within the atmosphere, with the objective of incorporating these parameterizations into general circulation models. The primary observational methods remote sending and other observations at the surface, particularly remote sensing of clouds, water vapor and aerosols

  16. Work measurement for estimating food preparation time of a bioregenerative diet

    Science.gov (United States)

    Olabi, Ammar; Hunter, Jean; Jackson, Peter; Segal, Michele; Spies, Rupert; Wang, Carolyn; Lau, Christina; Ong, Christopher; Alexander, Conor; Raskob, Evan; hide

    2003-01-01

    During space missions, such as the prospective Mars mission, crew labor time is a strictly limited resource. The diet for such a mission (based on crops grown in a bioregenerative life support system) will require astronauts to prepare their meals essentially from raw ingredients. Time spent on food processing and preparation is time lost for other purposes. Recipe design and diet planning for a space mission should therefore incorporate the time required to prepare the recipes as a critical factor. In this study, videotape analysis of an experienced chef was used to develop a database of recipe preparation time. The measurements were highly consistent among different measurement teams. Data analysis revealed a wide variation between the active times of different recipes, underscoring the need for optimization of diet planning. Potential uses of the database developed in this study are discussed and illustrated in this work.

  17. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    Energy Technology Data Exchange (ETDEWEB)

    Young, Ralph [Paducah Citizens Advisory Board (United States)

    2013-07-01

    One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site

  18. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site

  19. Economic-mathematical model of planning construction-installation work for automation in drilling

    Energy Technology Data Exchange (ETDEWEB)

    Tsay, L K

    1979-01-01

    The basis for increasing oil extraction is an increase in the volume of drilling operations which includes a set of work done by specialized enterprises, installation-adjustment administrations (IAA). Operational-calendar planning in the IAA still has many shortcomings. The main tasks of operational-calendar planning in the IAA can include distribution of work by facilities between specialized brigades and the formation of a schedule for shipping materials to the objects of the construction-installation operations. The basic criteria for optimization in operational-calendar planning are the maximum labor productivity, minimum duration of fulfillment of work, uniform consumption of resources, minimization of outlays for production of work. The second and the fourth criteria are inapplicable because of limited resources with directive periods of fulfilling the work. The first and third criterion mutually exclude each other. Since they are of equal value, it is suggested that the criterion be such an indicator as uniform consumption of resources. Then, by minimizing the degree of nonuniformity of consumption of the output of IAA contractors, one can determine the optimal uniform consumption of resources.

  20. Engineering work plan for container venting system drill press assembly troubleshooting. Revision 1

    International Nuclear Information System (INIS)

    Prather, M.C.

    1994-11-01

    This work plan is for troubleshooting the current CVS drill press to ensure that the drill bit assembly doesn't bind in the press plate. A drill press assembly has been fabricated for the Container Venting System (CVS). The drill bit assembly has bound in the press plate in previous revisions of this design. Initial troubleshooting of the drill press per Rev. 0 of this work plan was performed at the 200W Kaiser Machine Shop under Work Package 2H9401670F, Internal Work Order E20027. The drill press operated without jamming. Then, during the pre-operational test on 11/14/17 and the operational test on 11/17/94, two drum lids were drilled. Immediately after the test on 11/17/94, the drill was again operated, and it jammed. An inspection found shavings at the bottom of the drill bit assembly, between the drill bit sleeve and the press plate bore. This revised work plan provides direction for the machine shop to diagnose and correct this recent problem

  1. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    International Nuclear Information System (INIS)

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided

  2. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  3. Gas and liquid sampling for closed canisters in KW Basin - Work Plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Work Plan for the design and fabrication of gas/liquid sampler for closed canister sampling in KW Basin. This document defines the tasks associated with the design, fabrication, assembly, and acceptance testing equipment necessary for gas and liquid sampling of the Mark I and Mark II canisters in the K-West basin. The sampling of the gas space and the remaining liquid inside the closed canisters will be used to help understand any changes to the fuel elements and the canisters. Specifically, this work plan will define the scope of work and required task structure, list the technical requirements, describe design configuration control and verification methodologies, detail quality assurance requirements, and present a baseline estimate and schedule

  4. Quantum Jarzynski equality of measurement-based work extraction.

    Science.gov (United States)

    Morikuni, Yohei; Tajima, Hiroyasu; Hatano, Naomichi

    2017-03-01

    Many studies of quantum-size heat engines assume that the dynamics of an internal system is unitary and that the extracted work is equal to the energy loss of the internal system. Both assumptions, however, should be under scrutiny. In the present paper, we analyze quantum-scale heat engines, employing the measurement-based formulation of the work extraction recently introduced by Hayashi and Tajima [M. Hayashi and H. Tajima, arXiv:1504.06150]. We first demonstrate the inappropriateness of the unitary time evolution of the internal system (namely, the first assumption above) using a simple two-level system; we show that the variance of the energy transferred to an external system diverges when the dynamics of the internal system is approximated to a unitary time evolution. Second, we derive the quantum Jarzynski equality based on the formulation of Hayashi and Tajima as a relation for the work measured by an external macroscopic apparatus. The right-hand side of the equality reduces to unity for "natural" cyclic processes but fluctuates wildly for noncyclic ones, exceeding unity often. This fluctuation should be detectable in experiments and provide evidence for the present formulation.

  5. The primary organization of accounting in budgetary institutions of Ukraine: development of the work plan accounts

    Directory of Open Access Journals (Sweden)

    Svirko S.V.

    2017-03-01

    Full Text Available The questions of primary accounting of economic activity of budgetary institutions in the modernization budget accounting subsystem. With the object of study chosen mechanism for building and operating its own chart of accounts of economic activity of budgetary institutions. In order to develop a thesaurus budget accounting formed the definition of «work plan accounts economic activity of budgetary institutions». The approaches to determining impacts, principles and stages of construction work plan accounts, based on what model of development formed a working plan of accounts of economic activity of budgetary institutions, based on the combined general and technical principles and allows for certain vectors regulatory impact. The necessity of formation at the Ministry of Finance of Ukraine three typical plans for major accounts of the public sector. Based on the study of the Chart of Accounts in the public sector generated and presented a typical chart of accounts of budget institutions. Conclusions about the necessity of forming mechanism of development of analytical accounts for different entities public sector.

  6. Food parenting measurement issues: working group consensus report.

    Science.gov (United States)

    Hughes, Sheryl O; Frankel, Leslie A; Beltran, Alicia; Hodges, Eric; Hoerr, Sharon; Lumeng, Julie; Tovar, Alison; Kremers, Stef

    2013-08-01

    Childhood obesity is a growing problem. As more researchers become involved in the study of parenting influences on childhood obesity, there appears to be a lack of agreement regarding the most important parenting constructs of interest, definitions of those constructs, and measurement of those constructs in a consistent manner across studies. This article aims to summarize findings from a working group that convened specifically to discuss measurement issues related to parental influences on childhood obesity. Six subgroups were formed to address key measurement issues. The conceptualization subgroup proposed to define and distinguish constructs of general parenting styles, feeding styles, and food parenting practices with the goal of understanding interrelating levels of parental influence on child eating behaviors. The observational subgroup identified the need to map constructs for use in coding direct observations and create observational measures that can capture the bidirectional effects of parent-child interactions. The self-regulation subgroup proposed an operational definition of child self-regulation of energy intake and suggested future measures of self-regulation across different stages of development. The translational/community involvement subgroup proposed the involvement of community in the development of surveys so that measures adequately reflect cultural understanding and practices of the community. The qualitative methods subgroup proposed qualitative methods as a way to better understand the breadth of food parenting practices and motivations for the use of such practices. The longitudinal subgroup stressed the importance of food parenting measures sensitive to change for use in longitudinal studies. In the creation of new measures, it is important to consider cultural sensitivity and context-specific food parenting domains. Moderating variables such as child temperament and child food preferences should be considered in models.

  7. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  8. Some considerations on the development of individual work plan for teachers of Technical and Vocational Education

    Directory of Open Access Journals (Sweden)

    Carlos Alberto Gato Armas

    2010-03-01

    Full Text Available This article analyzes, from the optics of upgrading Technical and Professional Education chief staff in the province and professors in the Technical Sciences Faculty in the University of Pedagogical Sciencies “Rafael María of Mendive” in Pinar del Río, which can facilitate the elaboration of the plan for teachers’ individual work, so that it facilitates the assessment and performance of the planned activities, and at the same time, propitiating the professional development of the teachers, in each school term.

  9. Basic planning and work performance of Hanford Site environmental management activities

    International Nuclear Information System (INIS)

    Piper, L.L.

    1997-01-01

    This document provides an overview of the basic planning and work of the Department of Energy Richland Operations Office (DOE-RL). It defines key terms, concepts, and processes used in Hanford's Environmental Management (EM) activities. It is not intended to provide complete details on the topics discussed. It does, however, provide a roadmap of the overall process so that opportunities for tribal, regulator, and public involvement can be clearly identified. Many documents are referenced in this plan. Each is described in some detail in Section 5, and cross-references to that section are provided throughout the discussion in Sections 1 through 4

  10. Cancer survivorship care-planning: Practice, research, and policy implications for social work.

    Science.gov (United States)

    Wagner, Richard W; Pritzker, Suzanne

    2016-01-01

    Increasing numbers of cancer survivors are living longer than 5 years from their diagnosis date. This has resulted in a growing population of cancer survivors, expected to reach 19 million by 2024. Survivors frequently experience late effects caused by cancer and its treatment, reducing survivors' quality of life in multiple domains. Survivorship care-plans may aid the many physical, psychosocial, and financial needs that emerge posttreatment. However, the lack of reimbursement mechanisms, the limited amount of effectiveness research, and minimal guidelines for content and delivery are barriers to the widespread provision of survivorship care-plans. Challenges and opportunities for social work practice, research, and policy are identified and discussed.

  11. Work Factors, Work-Family Conflict, the Theory of Planned Behaviour and Healthy Intentions: A Cross-Cultural Study.

    Science.gov (United States)

    Shukri, Madihah; Jones, Fiona; Conner, Mark

    2016-12-01

    The present study examined the roles of work factors (i.e. job demands and job resources), work-family conflicts and culture on predictors of healthy intentions (fruit and vegetable consumption, low-fat diet and physical activity) within the framework of the theory of planned behaviour (TPB). Employees from the United Kingdom (N = 278) and Malaysia (N = 325) participated in the study. Results indicated that higher job demands were significantly related to lower intentions to eat a low-fat diet. Women reported higher intentions to eat a low-fat diet than men did, while participants from the United Kingdom had lower intentions to engage in physical activity compared with those from Malaysia. The efficacy of TPB variables in explaining intentions was verified, with perceived behavioural control (i.e. self-efficacy), attitudes and descriptive norms combined with past behaviour predictive across the samples. The results also suggest the roles of culture and work interference with family variables in moderating TPB-intention relationships and confirm that TPB variables mediate the effects of job demands and job resources on intentions. Practically, to promote health, identifying strategies to reduce stress factors; specifying important cognitive factors affecting work factors and thus, healthy intentions; and acknowledging cultural-specific determinants of healthy intentions are recommended. Copyright © 2015 John Wiley & Sons, Ltd. Copyright © 2015 John Wiley & Sons, Ltd.

  12. Dose measurement during defectoscopic work using electronic personal dosimeters

    International Nuclear Information System (INIS)

    Smoldasova, J.

    2008-01-01

    Personal monitoring of the external radiation of radiation, personnel exposed to sources of ionizing radiation at a workplace is an important task of the radiological protection. Information based on the measured quantities characterizing the level of the exposure of radiation personnel enable to assess the optimum radiological protection at the relevant workplace and ascertain any deviation from the normal operation in time. Different types of personal dosimeters are used to monitor the external radiation of radiation personnel. Basically, there are two types of dosimeters, passive and active (electronic). Passive dosimeters provide information on the dose of exposure after its evaluation, while electronic dosimeters provide this information instantly. The goal of the work is to compare data acquired during different working activities using the DMC 2000 XB electronic dosimeters and the passive film dosimeters currently used at the defectoscopic workplace. (authors)

  13. Integrated sampling and analysis plan for samples measuring >10 mrem/hour

    International Nuclear Information System (INIS)

    Haller, C.S.

    1992-03-01

    This integrated sampling and analysis plan was prepared to assist in planning and scheduling of Hanford Site sampling and analytical activities for all waste characterization samples that measure greater than 10 mrem/hour. This report also satisfies the requirements of the renegotiated Interim Milestone M-10-05 of the Hanford Federal Facility Agreement and Consent Order (the Tri-Party Agreement). For purposes of comparing the various analytical needs with the Hanford Site laboratory capabilities, the analytical requirements of the various programs were normalized by converting required laboratory effort for each type of sample to a common unit of work, the standard analytical equivalency unit (AEU). The AEU approximates the amount of laboratory resources required to perform an extensive suite of analyses on five core segments individually plus one additional suite of analyses on a composite sample derived from a mixture of the five core segments and prepare a validated RCRA-type data package

  14. Cavity assisted measurements of heat and work in optical lattices

    Directory of Open Access Journals (Sweden)

    Louis Villa

    2018-01-01

    Full Text Available We propose a method to experimentally measure the internal energy of a system of ultracold atoms trapped in optical lattices by coupling them to the fields of two optical cavities. We show that the tunnelling and self-interaction terms of the one-dimensional Bose-Hubbard Hamiltonian can be mapped to the field and photon number of each cavity, respectively. We compare the energy estimated using this method with numerical results obtained using the density matrix renormalisation group algorithm. Our method can be employed for the assessment of power and efficiency of thermal machines whose working substance is a strongly correlated many-body system.

  15. Work management administration FY 1995 site support program plan WBS 6.2

    Energy Technology Data Exchange (ETDEWEB)

    Hale, N.S.

    1994-09-01

    Westinghouse Hanford Company`s (WHC) near-term vision is to implement a Site-wide work management program that is consistent from one facility to the other, and can realize workforce efficiencies, minimum down time, and familiarization with facilities uniqueness. Additionally, consistent Hanford Site work management processes can produce meaningful information to be shared complex-wide as the US Department of Energy (DOE) cleans up facilities Site-wide. It is the mission of the WHC Work Management Administration Program to provide guidance and program direction on how to implement consistent and effective work management across the Hanford Site that comply with the DOE and other regulatory requirements. This report describes the steps needed to implement a work management plan at Hanford.

  16. Fiscal 1982 plans of works in National Institute of Radiological Sciences, Science and Technology Agency

    International Nuclear Information System (INIS)

    1982-01-01

    National Institute of Radiological Sciences, since its establishment in 1957, has engaged in the research and other works on the radiation injuries in human bodies, the medical utilization of radiation and the training and education of personnel in the field. The plans of works in fiscal 1982 in the NIRS are described. As special research works, there are the estimation of the degree of danger due to low level radiation for human bodies, environmental radiation exposure due to nuclear facilities, etc., the medical utilization of particle accelerators, and the biological effects of tritium in nuclear fusion reactor development. Ordinary research works include physics, chemistry, genetics, pharmacy, clinical research, etc. In other areas of activities are radiation risk evaluation, radioactivity investigation, technological aid, personnel education and training, and medical work. (Mori, K.)

  17. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale

  18. Indoor climate, psychosocial work environment and symptoms in open-plan offices

    DEFF Research Database (Denmark)

    Pejtersen, J; Allermann, L; Kristensen, T S

    2006-01-01

    To study the indoor climate, the psychosocial work environment and occupants' symptoms in offices a cross-sectional questionnaire survey was made in 11 naturally and 11 mechanically ventilated office buildings. Nine of the buildings had mainly cellular offices; five of the buildings had mainly open...... irritation, skin irritation, central nervous system (CNS) symptoms and psychosocial factors. Occupants in open-plan offices are more likely to perceive thermal discomfort, poor air quality and noise and they more frequently complain about CNS and mucous membrane symptoms than occupants in multi......-person and cellular offices. The association between psychosocial factors and office size was weak. Open-plan offices may not be suited for all job types. PRACTICAL IMPLICATION: Open-plan offices may be a risk factor for adverse environmental perceptions and symptoms....

  19. Plans and Measures for Avoiding Casting-Air-Pollution

    Institute of Scientific and Technical Information of China (English)

    ZHOU Jian

    2003-01-01

    This article presents plans of preventing casting-air-pollution in practice, and some avoiding methods in detail. In modern times, environment protection is looked high upon day by day; green-casting thus becomes more and more important.

  20. Measuring current emission and work functions of large thermionic cathodes

    International Nuclear Information System (INIS)

    Fortgang, C.M.

    2001-01-01

    As one component of the nations Stockpile Stewardship program, Los Alamos National Laboratory is constructing a 20 MeV, 2 kA (with a 4 kA upgrade capability), 3ps induction linac for doing x-ray radiography of explosive devices. The linac is one leg of a facility called the Dual-Axis Radiography Hydrodynamic Test Facility (DARHT). The electron gun is designed to operate at 3.2 MV. The gun is a Pierce type design and uses a 6.5' cathode for 2 kA operation and an 8' cathode for 4 kA operation. We have constructed a small facility called the Cathode Test Stand (CTS) to investigate engineering and physics issues regarding large thermionic dispenser-cathodes. In particular, we have looked at the issues of temperature uniformity on the cathode surface and cathode quality as measured by its work function. We have done thermal imaging of both 8' and 6.5' cathodes. Here we report on measurements of the cathode work function, both the average value and how it vanes across the face of the cathode.

  1. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2002-01-01

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  2. The effects of moderate heat stress and open-plan office noise distraction on office work

    DEFF Research Database (Denmark)

    Witterseh, Thomas; Wyon, David; Clausen, Geo

    2002-01-01

    Thirty subjects clothed for comfort at 22 deg.C performed simulated office work for 3 hours at 22/26/30 deg.C (7.4 g/kg dry air, i.e. 45/35/28 %RH) in quiet and recorded open-plan office noise (55 dBA) conditions. Warmth decreased perceived air quality (P......Thirty subjects clothed for comfort at 22 deg.C performed simulated office work for 3 hours at 22/26/30 deg.C (7.4 g/kg dry air, i.e. 45/35/28 %RH) in quiet and recorded open-plan office noise (55 dBA) conditions. Warmth decreased perceived air quality (P...

  3. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  4. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow

  5. Work plan for testing silicone impression material and fixture on pool cell capsule

    International Nuclear Information System (INIS)

    Lundeen, J.E.

    1994-01-01

    The purpose of this work plan is to provide a safe procedure to test a cesium capsule impression fixture at Waste Encapsulation and Storage Facility (WESF). The impression will be taken with silicone dental impression material pressed down upon the capsule using the impression fixture. This test will evaluate the performance of the fixture and impression material under high radiation and temperature conditions on a capsule in a WESF pool cell

  6. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  7. Project Work Plan: Hanford 100-D Area Treatability Demonstration - In Situ Biostimulation for Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Fruchter, Jonathan S.; Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.

    2006-05-31

    This work plan supports a new, integrated approach to accelerate cleanup of chromium in the Hanford 100 Areas. This new approach will provide supplemental treatment upgradient of the ISRM barrier by directly treating chromium and other oxidizing species in groundwater (i.e., nitrate and dissolved oxygen), thereby increasing the longevity of the ISRM barrier and protecting the ecological receptors and human health at the river boundary.

  8. The Hanford Site Environmental Restoration Program 1993 fiscal year work plan

    International Nuclear Information System (INIS)

    1992-09-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This document describes the overall ER Mission Area and provides FYWP appendixes for each of the five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Treatment, Storage, and/or Disposal (TSD)

  9. Review and Update Project Design, Work Plan and Activities for 2009 and Beyond

    International Nuclear Information System (INIS)

    Edward, M.

    2009-01-01

    A multi year ongoing project, previously approved by Board of Governors (BOG) that is implemented according to the already approved objectives/outcomes and time frame. All projects have time frame in line with the stated objectives and work plans, of maximum of five years. If rephasing is necessary due to dealys in implementation, the project duration can be extended by up to one year, maintaining the original objectives/outcomes

  10. Knowledge co-production and boundary work to promote implementation of conservation plans.

    Science.gov (United States)

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  11. ALARA database value in future outage work planning and dose management

    International Nuclear Information System (INIS)

    Miller, D.W.; Green, W.H.

    1995-01-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system's ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed

  12. ALARA database value in future outage work planning and dose management

    Energy Technology Data Exchange (ETDEWEB)

    Miller, D.W.; Green, W.H. [Clinton Power Station Illinois Power Co., IL (United States)

    1995-03-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.

  13. Resources on work zone safety and mobility performance monitoring and measurement.

    Science.gov (United States)

    2013-01-01

    Work zone performance measures are metrics that help quantify how work zones impact travelers, residents, businesses, and workers. Some performance measures describe how an individual work zone impacts these audiences; other performance measures desc...

  14. Georgetown University generic integrated community energy system GU-ICES demonstration project. Modified work management plan. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-04-01

    This Phase II Modified Work Management Plan reflects the change from a Coal Using ICES to a Generic ICES Program. As such, it retains the essential elements relating to coal while broadening the number and types of alternative energy subsystems to be evaluated for eventual implementation on the Georgetown University Campus. In addition to the plan in Book I, Book II deals with an energy audit conducted at the campus in the fall of 1978 to establish a gross baseline from which to measure and evaluate the contributions of selected alternative energy subsystems both from an energy and cost standpoint. Book I proceeds from a discussion of an ICES through an explanation of the scope of effort in each phase expanded into detailed task descriptions by phase together with schedules, PERT and GANTT charts, milestones and levels of effort by task for the Feasibility Analysis, and schedules for the overall program. A description of examples of alternative subsystems to be considered is also included. A detailed Management Plan for the conduct of the effort by General Electric completes the plan. Appendices related to cogeneration, life-cycle costing, GE energy subsystems, the GU Master Energy Plan, and typical regulatory processes to be encountered are included. Book II treats the Energy Audit under the three committed task areas of System Description, Analysis and Survey, and Criteria for Energy Usage. The five major energy systems utilized at Georgetown are considered: electrical, chilled water, steam, gas and fuel oil, and city water. A top level analysis yields significant results and recommendations for further action with respect to a detailed measurements program, particularly of steam and electric power usage, over a one year period.

  15. Engineering Work Plan for the Development of Phased Startup Initiative (PSI) Phases 3 and 4 Test Equipment

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    A number of tools and equipment pieces are required to facilitate planned test operations during Phases 3 and 4 of the Phased Startup Initiative (PSI). These items will be used in assessing residual canister sludge quantities on cleaned fuel assemblies, sorting coarse and fine scrap fuel pieces, assessing the size distribution of scrap pieces, loading scrap into a canister, and measuring the depth of the accumulated scrap in a canister. This work plan supercedes those previously issued for development of several of these test items. These items will be considered prototype equipment until testing has confirmed their suitability for use in K West Basin. The process described in AP-EN-6-032 will be used to qualify the equipment for facility use. These items are considered non-OCRWM for PSI Phase 3 applications. The safety classification of this equipment is General Service, with Quality Level 0 (for PSI Phase 3). Quality Control inspections shall be performed to verify basic dimensions and overall configurations of fabricated components, and any special quality control verifications specified in this work plan (Section 3.1.5). These inspections shall serve to approve the test equipment for use in K West Basin (Acceptance Tag). This equipment is for information gathering only during PSI Phases 3 and 4 activities, and will be discarded at the completion of PSI. For equipment needed to support actual production throughput, development/fabrication/testing activities would be more rigorously controlled

  16. Remedial design work plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    The Remedial Design Work Plan (RDWP) for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee, has been prepared. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative, as stated in the Record of Decision (ROD) was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Thereafter, a public hearing was held to review the proposed plan. Comments were incorporated. The revised selected remedy, per the ROD is to excavate and dispose of floodplain soils contaminated above the remediation goal of 400 parts per million mercury. The approved ROD with this goal will be the basis for remedial design (RD). The RD work plan (RDWP) is composed of six chapters. An introductory chapter describes the purpose and scope of the RDWP, the selected remedy as identified by the ROD; the roles and responsibilities of the RD team members, and the site background information, including site history, contaminants of concern, and site characteristics. Chapter 2 contains the design objectives, RD approach, regulatory considerations during RD, and the design criteria with assumptions. Chapter 3 presents the RD planning process to prepare this RDWP, as well as secondary RD support plans. Chapter 4 describes the scope of the RD activities in more detail and identifies what will be included in the design package. Chapter 5 presents the schedule for performance of the RD activities, identifying key RD milestones. Specific documents used in the preparation of this document are referenced in Chapter 6

  17. Work of adhesion measurements by a periodic cracking technique

    International Nuclear Information System (INIS)

    Davutoglu, A.; Aksay, I.A.

    1981-01-01

    In a recent study, Chow et al. introduced a technique for determining the energy associated with interfacial separation of a two-layer composite which consisted of a polymeric substrate and a brittle film overcoat. The technique is based on a model which assumes a perfectly elastic composite. In the present study, it s shown that as long as only the film component of the composite is brittle, the technique is also applicable to the composites where the substrates may display plastic deformation prior to adhesive failure of the film. Strain measurements, instead of load, eliminate the difficulties introduced by the plastic behavior of the substrate. Experimental work was performed on systems containing brittle amorphous selenium films on aluminum and Mylar substrates. These systems with selenium films were of interest due to their usage in photoreceptor technology

  18. Working towards the SDGs: measuring resilience from a practitioner's perspective

    Science.gov (United States)

    van Manen, S. M.; Both, M.

    2015-12-01

    The broad universal nature of the SDGs requires integrated approaches across development sectors and action at a variety of scales: from global to local. In humanitarian and development contexts, particularly at the local level, working towards these goals is increasingly approached through the concept of resilience. Resilience is broadly defined as the ability to minimise the impact of, cope with and recover from the consequences of shocks and stresses, both natural and manmade, without compromising long-term prospects. Key in this are the physical resources required and the ability to organise these prior to and during a crisis. However, despite the active debate on the theoretical foundations of resilience there is a comparative lack in the development of measurement approaches. The conceptual diversity of the few existing approaches further illustrates the complexity of operationalising the concept. Here we present a practical method to measure community resilience using a questionnaire composed of a generic set of household-level indicators. Rooted in the sustainable livelihoods approach it considers 6 domains: human, social, natural, economic, physical and political, and evaluates both resources and socio-cognitive factors. It is intended to be combined with more specific intervention-based questionnaires to systematically assess, monitor and evaluate the resilience of a community and the contribution of specific activities to resilience. Its use will be illustrated using a Haiti-based case study. The method presented supports knowledge-based decision making and impact monitoring. Furthermore, the evidence-based way of working contributes to accountability to a range of stakeholders and can be used for resource mobilisation. However, it should be noted that due to its inherent complexity and comprehensive nature there is no method or combination of methods and data types that can fully capture resilience in and across all of its facets, scales and domains.

  19. Making Strategic Planning Work in Local Government: An Empirical Study of Success And Failure

    Directory of Open Access Journals (Sweden)

    Ángel IGLESIAS

    2015-10-01

    Full Text Available Since the 1990s, local governments all over Europe have launched reforms to improve local democracy, public management and efficiency in the provision of local services. Some of these reforms are inspired by what previously has worked in private management and some of them have also a macro-level approach, whose main aim is to introduce institutional reforms and reorganizations to ensure contextual problem solving by strengthening governance within the local public sector. In this context, Strategic Planning in public organizations has attracted interest among academic researchers and practitioners as an instrument for dealing with a complex environment and for the achievement of higher performance and the attainment of greater democracy. But the decision on how to introduce Strategic Planning might follow a different rationale. The hypothesis maintained in this paper is that those that are based in an endogenous rationale are more likely to succeed. To test our hypothesis this paper draws on a comparative empirical analysis concerning the design and implementation of a Strategic Planning process within two Spanish city governments: one considered to have been a failure and the other a success. Focusing on the way in which the use of Strategic Planning has to face the trade-offs between urban and economic development and democracy, the paper explores how this formal mechanism of citizen´s and business’ participation serves to establish relational processes to reinvigorate local economic development, democracy and administrative modernization only when a strong political and administrative leadership is put into motion. Overall, the study yields evidence consistent with the notion that a successful Strategic Planning at the local level has to take into account not only institutional issues, but also the communal, social and political resources that frame the deliberations propelled by the Strategic Planning process.

  20. A neural measure of precision in visual working memory.

    Science.gov (United States)

    Ester, Edward F; Anderson, David E; Serences, John T; Awh, Edward

    2013-05-01

    Recent studies suggest that the temporary storage of visual detail in working memory is mediated by sensory recruitment or sustained patterns of stimulus-specific activation within feature-selective regions of visual cortex. According to a strong version of this hypothesis, the relative "quality" of these patterns should determine the clarity of an individual's memory. Here, we provide a direct test of this claim. We used fMRI and a forward encoding model to characterize population-level orientation-selective responses in visual cortex while human participants held an oriented grating in memory. This analysis, which enables a precise quantitative description of multivoxel, population-level activity measured during working memory storage, revealed graded response profiles whose amplitudes were greatest for the remembered orientation and fell monotonically as the angular distance from this orientation increased. Moreover, interparticipant differences in the dispersion-but not the amplitude-of these response profiles were strongly correlated with performance on a concurrent memory recall task. These findings provide important new evidence linking the precision of sustained population-level responses in visual cortex and memory acuity.

  1. Evaluation of the probabilistic safety assessment portfolio for NSD. Plan of work

    International Nuclear Information System (INIS)

    Gould, J.

    1999-01-01

    The aim is to use the research portfolio evaluation protocol developed by HSL to evaluate the Probabilistic Safety Assessment (PSA) portfolio, both to draw conclusions about the PSA portfolio and as a pilot study to show the suitability of the evaluation protocol. The objectives of the work are: (1) To collect sufficient information to carry out a preliminary review of the portfolio; (2) o produce a plan of work detailing the time and costs to carry out a full evaluation of the PSA portfolio; (3) to evaluate the PSA portfolio of research; (4) to produce a report of the evaluation of the PSA portfolio; (5) if necessary, to make changes to the methodology in light of the experience gained in the evaluation of the PSA research portfolio. This report completes objectives 1 and 2. It details the plan of work for the evaluation of the PSA research portfolio. The plan has shown that the evaluation of the PSA research portfolio has many difficulties to overcome. It is suitable as a pilot study to show the suitability of the portfolio evaluation protocol and will provide valuable information that can be used to improve it. The evaluation of the PSA portfolio will require a considerable amount of time and effort to complete. The task analysis has shown it to be of the order of Pound Sterling 25k and to take two months to complete after this preliminary data collection. The plan to evaluate the PSA research portfolio detailed in this report should be carried out and the lessons learned by carrying out this pilot study should be used to improve the evaluation protocol

  2. European Climate Change Programme. Working Group II. Impacts and Adaptation. Urban Planning and Construction. Sectoral Report

    International Nuclear Information System (INIS)

    2007-03-01

    Adaptation is a new policy area for the European Climate Change Policy. The Impacts and Adaptation Workgroup has been set up as part of European Climate Change Programme (ECCP II). The main objective of the workgroup is to explore options to improve Europe's resilience to climate change impacts, to encourage the integration of climate change adaptation into other policy areas at the European, national, regional and local level and to define the role of EU-wide policies complementing action by Member States. The aim of this initial programme of work is to identify good practice in the development of adaptation policy and foster learning from different sectoral experiences and explore a possible EU role in adaptation policies. The Commission has led a series of 10 sectoral meetings looking at adaptation issues for different sectors. One of these meetings looked at the impacts on urban planning and infrastructure in particular. This report summarises the state of play in the urban planning sector in relation to adaptation to climate change on the basis of the information gathered at the stakeholder meeting. Some of the other stakeholder meetings, such as the meeting on human health, have a strong connection with the urban planning agenda. Therefore, some actions in the sector report on adaptation and human health relate to urban planning and infrastructure considerations

  3. Proposing and Planning the Rehabilitation Works of Mechanical Utility System in Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Jusnan Hasim; Mohamad Suhaimi Yahaya; Abdul Razak Hashim

    2015-01-01

    Nuclear Malaysia has 2 complex located in Bangi and Jalan Dengkil. The utility in Nuclear Malaysia consists of civil, mechanical and electrical system that has been managed by Bahagian Kejuruteraan (BKJ). The mechanical utilities system has been divided to three main groups which are the main system, supporting system and safety equipment's. The objectives of this paper are to propose and plan the rehabilitation works of mechanical utility system in Nuclear Malaysia and also to explain working procedures in maintaining and repairing the mechanical utility system. The study suggest the rehabilitation works on the mechanical utilities system especially on Thermal Energy Storage (TES) and domestic water system needs to be done which involve process of design, procurement, installation and commissioning. (author)

  4. Measuring the Economic Value of Pre-MBA Work Experience

    Science.gov (United States)

    Yeaple, Ronald N.; Johnston, Mark W.; Whittingham, Keith L.

    2010-01-01

    Pre-MBA work experience is required for admission to many graduate schools of business. In the present study, MBA graduates with a wide range of pre-MBA work experience were surveyed to assess the economic value of such work experience. No evidence was found of a systematic financial advantage to students from working for several years before…

  5. Informal work and formal plans: articulating the active role of patients in cancer trajectories

    Directory of Open Access Journals (Sweden)

    Rikke Juul Dalsted

    2012-12-01

    Full Text Available Introduction: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer trajectories.  Methods and theory: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included.  Results: Patients continuously took initiatives to organize their treatment and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories.  Patients presented problems to the healthcare professionals in order to get proper help when needed.  Discussion: Work done by patients was invisible and not perceived as work. The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients´ active participation. When looking at integrated care from the perspective of patients, the development of a more holistic and personalized approach is needed. Introduction: Formal pathway models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer trajectories. Methods and theory: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. Results: Patients continuously took initiatives to organize their

  6. The Army Communications Objectives Measurement System (ACOMS): Survey Analysis Plan

    Science.gov (United States)

    1988-05-01

    Analysis Plan 12. PERSONAL AUTHOR(S) Gregory H. Gaertner (Westat) and Timothy W. Elig (ARI), editors 13a. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF...such as those of Lavidge and Steiner (1961), McGuire (1969), and Fishbein and Azjen (1975). Fishbein and Azjen (1975) and Aaker (1975) present...for college, challenge and personal development, or patriotic service). Corresponding to these beliefs are evaluations of the importance of these

  7. Measurement of the accuracy of dental working casts using a coordinate measuring machine

    Directory of Open Access Journals (Sweden)

    Potran Michal

    2016-01-01

    Full Text Available Background/Aim: Dental impressions present a negative imprint of intraoral tissues of a patient which is, by pouring in gypsum, transferred extraorally on the working cast. Casting an accurate and precise working cast presents the first and very important step, since each of the following stages contributes to the overall error of the production process, which can lead to inadequately fitting dental restorations. The aim of this study was to promote and test a new model and technique for in vitro evaluation of the dental impression accuracy, as well as to asses the dimensional stability of impression material depending on the material bulk, and its effect on the accuracy of working casts. Methods. Impressions were made by the monophasic technique using the experimental master model. Custom trays with spacing of 1, 2 and 3 mm were constructed by rapid prototyping. The overall of 10 impressions were made with each custom tray. Working casts were made with gypsum type IV. Measurement of working casts was done 24 h later using a co-ordinate measuring machine. Results. The obtained results show that the working casts of all the three custom trays were in most cases significantly different in the transversal and sagittal planes in relation to the master model. The height of abutments was mainly unaffected. The degree of convergence showed certain significance in all the three custom trays, most pronounced in the tray with 3 mm spacing. Conclusion. The impression material bulk of 1–3 mm could provide accurate working casts when using the monophasic impression technique. The increase of the distance between abutment teeth influences the accuracy of working casts depending on the material bulk. [Projekat Ministarstva nauke Republike Srbije, br. TR 35020: Research and development of modelling methods and approaches in manufacturing of dental recoveries with the application of modern technologies and computer aided systems

  8. Development of performance measures for the assessment of rural planning organizations.

    Science.gov (United States)

    2011-04-27

    In order for the Transportation Planning Board to provide oversight and assistance to the 20 RPOs in the state, they : need effective evaluation criteria and performance measures. The existing measures, including the annual : performance report, do n...

  9. Detroit Works Long-Term Planning Project: Engagement Strategies for Blending Community and Technical Expertise

    Directory of Open Access Journals (Sweden)

    Toni L. Griffin

    2014-10-01

    Full Text Available In January 2013, civic leaders, community stakeholders, and residents came together to release Detroit Future City: 2012 Detroit Strategic Framework Plan, a guiding blueprint for transforming Detroit from its current state of population loss and excessive vacancy into a model for the reinvention of post-industrial American cities. Three years prior, the U.S. Census had reported that the city had lost 24% of its population over the last decade and had experienced a 20% increase in vacant and abandoned property, bringing total vacancy to roughly the size of Manhattan. In addition to physical and economic challenges, Detroiters had also acknowledged significant barriers to effective civic engagement. Foremost among these barriers were a profound sense of immobilization, planning fatigue, and a general perception of cynicism about planning and engagement efforts. These challenges were compounded by historic racial dynamics and tension. This case study elaborates on the comprehensive and innovative civic engagement executed in a citywide planning process called the Detroit Works Project, which took place from late 2010 through late 2012. For the citywide planning process to be successful and sustainable, civic leaders and project funders committed to a planning initiative that would be different from previous efforts, in large part because the “owners” of the process would be diverse and inclusive across all community sectors. The case study, written by three of the key consultants from the project, describes four key civic engagement strategies deployed in the creation of the strategic framework: (1 addressing profound challenges of culture, race, and politics by deliberately building trust; (2 elevating community expertise by fostering a sense of ownership of the process; (3 blending technical and community expertise; and (4 viewing civic engagement as an ongoing two-way conversation rather than a series of large-scale episodic events. This

  10. Work plan for development of K-Basin fuel handling tools

    International Nuclear Information System (INIS)

    Bridges, A.E.

    1994-01-01

    The purpose of this document is to provide the engineering work plan for the development of handling tools for the removal of N-Reactor fuel elements from their storage canisters in the K-Basins storage pool and insertion into the Single Fuel Element Cans for subsequent shipment to a Hot Cell for examination. Examination of these N-Reactor fuel elements is part of the overall characterization effort. New hand tools are required since previous fuel movement has involved grasping the fuel in a horizontal position. These tools are required to lift an element from the storage canister

  11. Work plan for defining a standard inventory estimate for wastes stored in Hanford Site underground tanks

    International Nuclear Information System (INIS)

    Hodgson, K.M.

    1996-01-01

    This work plan addresses the Standard Inventory task scope, deliverables, budget, and schedule for fiscal year 1997. The goal of the Standard Inventory task is to resolve differences among the many reported Hanford Site tank waste inventory values and to provide inventory estimates that will serve as Standard Inventory values for all waste management and disposal activities. These best-basis estimates of chemicals and radionuclides will be reported on both a global and tank-specific basis and will be published in the Tank Characterization Database

  12. Worker protection, especially protection against radiation during repair work on nuclear power stations in the planning and licensing phases

    International Nuclear Information System (INIS)

    Berg, D.; Kirsch, H.; Knape, H.

    1979-01-01

    The Strahlenschutzverordnung (Regulation for Protection against Radiation) requires that the designers of a nuclear power plant take every possible step in regard to preventive measures for the protection against radiation, in order to keep the radiation exposure to maintenance personnel as low as possible. The guideline concerning preventive measures for radiation protection of maintenance personnel during the design phase of the plant, which has been released by BMI (Federal Ministry of the Interior) requires evidence from the applicant, which describe these preventive measures. These evidences will be presented commonly by the manufacturer and the operator. The operators of nuclear plants have the greatest interest in planning the prevantive measures for the protection against radiation during maintenance work to an optimum, besides the fulfillment of these evidences, due to the fact that they bear the responsibility for the effectiveness of these measures, and that an increased exposure of the personnel to radiation- and/or operational restrictions cannot be excluded at insufficient preventive measures. In order to fulfill above mentioned viewpoints, RWE has developed a strategy, which will be presented in this lecture. All activities which have to be performed during the design and construction phase will be specified. The preventive measures to be performed during the design and construction of nuclear power plants will be persecuted in three parallel and independently from each other proceeded settlement levels: Settlement of the licensing procedure, general settlement of orders, model settlement. (orig./RW) [de

  13. Measuring procrastination at work and its associated workplace aspects

    NARCIS (Netherlands)

    Metin, U.B.; Taris, T.W.; Peeters, M.C.W.

    2016-01-01

    Procrastination at work can be defined as putting off workrelated action by engaging in nonwork-related actions during work hours. This paper (a) introduces and validates a new instrument tapping procrastination behaviours at work, (b) investigates its construct validity (Study 1), and (c) presents

  14. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium- 99 T c -Nitrate multi-contaminant IRM plume identified beneath U Plant

  15. Mobile on-line working radioaerosol-measuring systems in Baden-Wuerttemberg

    International Nuclear Information System (INIS)

    Aures, R.; Wenzel, H.

    1998-01-01

    In Baden-Wuerttemberg eight on-line measuring radioaerosol monitoring stations are successfully working since a lot of years. These monitoring stations spread over the whole country give only a rough overview of the radiological situation in the environment after an event like the Chernobyl accident. But it is expensive to increase the number of the monitoring stations in this network. This is why the 'Landesanstalt fuer Umweltschutz Baden-Wuerttemberg' (LfU) got the order from the 'Ministerium fuer Umwelt und Verkehr Baden-Wuerttemberg' to conceive a mobile on-line working radioaerosol-measuring system for environmental measurements (MORAM). The LfU had made the plans and a company built up the first prototype. In action the MORAM should send every time automatically data of radioactivity in the air and datas of meteorology from its position to the controlling center in Karlsruhe. The MORAM works by remote control, needs little servicing and is independent from main connection. In case of a nuclear event several MORAMs could be used as a local monitoring network or they could increase the number of the radioaerosol monitoring stations for a certain time. Normally, the MORAMs will be storaged and are always ready for action. All the tests with the prototype 1 are finished in the meantime and the result of the tests is a new improved prototype 2, which can be used in the emergency case. This prototype was given to the LfU. (orig.) [de

  16. Updated action plan for the implementation of measures as a consequence of the Fukushima reactor accident

    International Nuclear Information System (INIS)

    2014-01-01

    The action plan of the German government concerning the measures following the Fukushima reactor accident include the decision on the future of nuclear power in Germany, safety analyses, investigations and measures for nuclear power plants in a national frame, investigations in an international frame, planning for the implementation of CNS (Convention on nuclear safety) topics 1-3, i.e. measures to increase the robustness in German nuclear power plants, and the planning of implementation of further measures (CNS topics 4-6).

  17. Statewide planning scenario synthesis : transportation congestion measurement and management.

    Science.gov (United States)

    2005-09-01

    This study is a review of current practices in 13 states to: (1) measure traffic congestion and its costs; and (2) manage congestion with programs and techniques that do not involve the building of new highway capacity. In regard to the measures of c...

  18. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  19. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  20. Measuring the quality of MDT working: an observational approach

    Directory of Open Access Journals (Sweden)

    Taylor Cath

    2012-05-01

    Full Text Available Abstract Background Cancer multidisciplinary teams (MDTs are established in many countries but little is known about how well they function. A core activity is regular MDT meetings (MDMs where treatment recommendations are agreed. A mixed methods descriptive study was conducted to develop and test quality criteria for observational assessment of MDM performance calibrated against consensus from over 2000 MDT members about the “characteristics of an effective MDT”. Methods Eighteen of the 86 ‘Characteristics of Effective MDTs’ were considered relevant and feasible to observe. They collated to 15 aspects of MDT working covering four domains: the team (e.g. attendance, chairing, teamworking; infrastructure for meetings (venue, equipment; meeting organisation and logistics; and patient-centred clinical decision-making (patient-centredness, clarity of recommendations. Criteria for rating each characteristic from ‘very poor’ to ‘very good’ were derived from literature review, observing MDMs and expert input. Criteria were applied to 10 bowel cancer MDTs to assess acceptability and measure variation between and within teams. Feasibility and inter-rater reliability was assessed by comparing three observers. Results Observational assessment was acceptable to teams and feasible to implement. Total scores from 29 to 50 (out of 58 highlighted wide diversity in quality between teams. Eight teams were rated either ‘very good/good’ or ‘very poor/poor’ for at least three domains demonstrating some internal consistency. ‘Very good’ ratings were most likely for attendance and administrative preparation, and least likely for patient-centredness of decision-making and prioritisation of complex cases. All except two characteristics had intra-class correlations of ≥0.50. Conclusions This observational tool (MDT-OARS may contribute to the assessment of MDT performance. Further testing to confirm validity and reliability is required.

  1. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  2. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  3. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  4. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year

  5. Questionnaire survey report on measurement of radioactivity in working environment of radioisotopes facility

    International Nuclear Information System (INIS)

    Kawano, Takao; Nomura, Kiyoshi

    2008-01-01

    To look over the current measurement of radioactivity concentration in working environment of many radioisotopes facilities, a questionnaire survey was carried out under the auspices of the Planning Committee of the Japan Society of Radiation Safety Management. 64 responses were obtained in 128 radiation facilities, which the questionnaires were sent to. The main results were obtained by aggregate analysis of the answers for questionnaires as the followings. Major nuclides subject to measurement were 3 H, 14 C, 32 P and 125 I Sampling of radioisotopes in air was mainly performed using collectors like dust samplers and HC-collectors. Liquid scintillation counters and gamma counters were used to measure β and γ radioactivity contained in airborne particles or gas samples. Contamination by radioactivity was not detected in 55% facilities surveyed, but in 40% facilities at the same level as or at lower levels than a hundredth part of the regulated concentration limit of each nuclide. Almost all facilities is found to consider that the measurement of radioactivity concentration in working environments is not always necessary. (author)

  6. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  7. Planning and Optimization of Wireless LANs through Field Measurements

    OpenAIRE

    Mongia, Puneet Kumar; Singh, B. J.

    2013-01-01

    In this paper, the field measurements of signal strength taken at the frequency of 2432 MHz in indoor & outdoor environments are presented and analyzed. The received signal levels from the base station were monitored manually. Total coverage area considered for the measurement campaign consisted of a mixture of different propagation environments. Based on the experimental data obtained, path loss exponent and standard deviation of signal strength variability are derived. It is shown that the ...

  8. Working electrodes from amalgam paste for electrochemical measurements

    Czech Academy of Sciences Publication Activity Database

    Josypčuk, Bohdan; Šestáková, Ivana

    2008-01-01

    Roč. 20, č. 4 (2008), s. 426-433 ISSN 1040-0397 R&D Projects: GA ČR GA203/07/1195; GA ČR GA521/06/0496 Institutional research plan: CEZ:AV0Z40400503 Keywords : voltammetry * paste amalgam * silver amalgam * paste electrode Subject RIV: CG - Electrochemistry Impact factor: 2.901, year: 2008

  9. Multi-Working Modes Product-Color Planning Based on Evolutionary Algorithms and Swarm Intelligence

    Directory of Open Access Journals (Sweden)

    Man Ding

    2010-01-01

    Full Text Available In order to assist designer in color planning during product development, a novel synthesized evaluation method is presented to evaluate color-combination schemes of multi-working modes products (MMPs. The proposed evaluation method considers color-combination images in different working modes as evaluating attributes, to which the corresponding weights are assigned for synthesized evaluation. Then a mathematical model is developed to search for optimal color-combination schemes of MMP based on the proposed evaluation method and two powerful search techniques known as Evolution Algorithms (EAs and Swarm Intelligence (SI. In the experiments, we present a comparative study for two EAs, namely, Genetic Algorithm (GA and Difference Evolution (DE, and one SI algorithm, namely, Particle Swarm Optimization (PSO, on searching for color-combination schemes of MMP problem. All of the algorithms are evaluated against a test scenario, namely, an Arm-type aerial work platform, which has two working modes. The results show that the DE obtains the superior solution than the other two algorithms for color-combination scheme searching problem in terms of optimization accuracy and computation robustness. Simulation results demonstrate that the proposed method is feasible and efficient.

  10. Multiple Data Stream Measurement of UX in a Work Context

    DEFF Research Database (Denmark)

    Yadav, Mohit; Clemmensen, Torkil

    In this paper we discuss the emergence of a redefined human work interaction design environment due to Internet of Things. The change in paradigm challenges designers to re-think the category of the user/worker to include their trusted IT devices/cognitive objects while designing for work...

  11. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan

  12. Measuring Engagement at Work: Validation of the Chinese Version of the Utrecht Work Engagement Scale

    OpenAIRE

    Ng, Sm; Fong, TCt

    2011-01-01

    Background: Work engagement is a positive work-related state of fulfillment characterized by vigor, dedication, and absorption. Previous studies have operationalized the construct through development of the Utrecht Work Engagement Scale. Apart from the original three-factor 17-item version of the instrument (UWES-17), there exists a nine-item shortened revised version (UWES-9). Purpose: The current study explored the psychometric properties of the Chinese version of the Utrecht Work Engagemen...

  13. Measuring Engagement at Work: Validation of the Chinese Version of the Utrecht Work Engagement Scale

    OpenAIRE

    Fong, Ted Chun-tat; Ng, Siu-man

    2011-01-01

    Background Work engagement is a positive work-related state of fulfillment characterized by vigor, dedication, and absorption. Previous studies have operationalized the construct through development of the Utrecht Work Engagement Scale. Apart from the original three-factor 17-item version of the instrument (UWES-17), there exists a nine-item shortened revised version (UWES-9). Purpose The current study explored the psychometric properties of the Chinese version of the Utrecht Work Engagement ...

  14. A clinical distance measure for evaluating treatment plan quality difference with Pareto fronts in radiotherapy

    Directory of Open Access Journals (Sweden)

    Kristoffer Petersson

    2017-07-01

    Full Text Available We present a clinical distance measure for Pareto front evaluation studies in radiotherapy, which we show strongly correlates (r = 0.74 and 0.90 with clinical plan quality evaluation. For five prostate cases, sub-optimal treatment plans located at a clinical distance value of >0.32 (0.28–0.35 from fronts of Pareto optimal plans, were assessed to be of lower plan quality by our (12 observers (p < .05. In conclusion, the clinical distance measure can be used to determine if the difference between a front and a given plan (or between different fronts corresponds to a clinically significant plan quality difference.

  15. Measuring the usefulness of family planning job aids following distribution at training workshops.

    Science.gov (United States)

    Tumlinson, Katherine; Hubacher, David; Wesson, Jennifer; Lasway, Christine

    2010-09-01

    A job aid is a tool, such as a flowchart or checklist, that makes it easier for staff to carry out tasks by providing quick access to needed information. Many public health organizations are engaged in the production of job aids intended to improve adherence to important medical guidelines and protocols, particularly in resource-constrained countries. However, some evidence suggests that actual use of job aids remains low. One strategy for improving utilization is the introduction of job aids in training workshops. This paper summarizes the results of two separate evaluations conducted in Uganda and the Dominican Republic (DR) which measured the usefulness of a series of four family planning checklists 7-24 months after distribution in training workshops. While more than half of the health care providers used the checklists at least once, utilization rates were sub-optimal. However, the vast majority of those providers who utilized the checklists found them to be very useful in their work.

  16. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  17. Working with Error and Uncertainty to Increase Measurement Validity

    Science.gov (United States)

    Amrein-Beardsley, Audrey; Barnett, Joshua H.

    2012-01-01

    Over the previous two decades, the era of accountability has amplified efforts to measure educational effectiveness more than Edward Thorndike, the father of educational measurement, likely would have imagined. Expressly, the measurement structure for evaluating educational effectiveness continues to rely increasingly on one sole…

  18. Measuring pregnancy planning: A psychometric evaluation and comparison of two scales.

    Science.gov (United States)

    Drevin, Jennifer; Kristiansson, Per; Stern, Jenny; Rosenblad, Andreas

    2017-11-01

    To psychometrically test the London Measure of Unplanned Pregnancy and compare it with the Swedish Pregnancy Planning Scale. The incidence of unplanned pregnancies is an important indicator of reproductive health. The London Measure of Unplanned Pregnancy measures pregnancy planning by taking contraceptive use, timing, intention to become pregnant, desire for pregnancy, partner agreement, and pre-conceptual preparations into account. It has, however, previously not been psychometrically evaluated using confirmatory factor analysis. The Likert-scored single-item Swedish Pregnancy Planning Scale has been developed to measure the woman's own view of pregnancy planning level. Cross-sectional design. In 2012-2013, 5493 pregnant women living in Sweden were invited to participate in the Swedish Pregnancy Planning study, of whom 3327 (61%) agreed to participate and answered a questionnaire. A test-retest pilot study was conducted in 2011-2012. Thirty-two participants responded to the questionnaire on two occasions 14 days apart. Data were analysed using confirmatory factor analysis, Cohen's weighted kappa and Spearman's correlation. All items of the London Measure of Unplanned Pregnancy contributed to measuring pregnancy planning, but four items had low item-reliability. The London Measure of Unplanned Pregnancy and Swedish Pregnancy Planning Scale corresponded reasonably well with each other and both showed good test-retest reliability. The London Measure of Unplanned Pregnancy may benefit from item reduction and its usefulness may be questioned. The Swedish Pregnancy Planning Scale is time-efficient and shows acceptable reliability and construct validity, which makes it more useful for measuring pregnancy planning. © 2017 John Wiley & Sons Ltd.

  19. Digital Instrumentation and Control working group (DICWG) - MDEP DICWG Programme Plan 2012 2013

    International Nuclear Information System (INIS)

    2012-02-01

    The Multinational Design Evaluation Programme (MDEP) Digital Instrumentation and Controls Working Group (DICWG) was approved by MDEP's Policy Group in March 2008 and meets approximately 3 times a year. All MDEP members and the IAEA are invited to participate in this working group's activities. The DICWG's main objectives are as follows: - to document common positions in the DI and C safety systems design areas; - to harmonise and converge national codes, standards and regulatory requirements and practices in this area while recognising the sovereign rights and responsibilities of national regulators in carrying out their safety reviews of new reactor designs (see the DICWG programme plan for more details of the group's work). The DICWG interacts regularly with the following organisations: - IEC (International Electro-technical Commission) Subcommittee 45A, Instrumentation and Control of Nuclear Facilities; - IEEE (Institute of Electric and Electronics Engineers); - other organisations involved in the design of digital I and C safety systems for nuclear power plants. The DICWG reports its status to the MDEP Steering Technical Committee at the latter's thrice annual meetings. This document presents the 2012 and 2013 programme plan and its products: the Generic Common Position DICWG-02 on Software Tools; the Generic Common Position DICWG-03 on Verification and Validation throughout the Life Cycle of Safety Systems Using Digital Computers; the Generic Common Position DICWG-04 on Communication Independence; the Generic Common Position DICWG-05 on Treatment of Hardware Description Language (HDL) Programmed Devices for Use in Nuclear Safety Systems; the Generic Common Position DICWG-06 on Simplicity in Design; the Generic Common Position DICWG-08 on Impact of Cyber Security Features on Digital I and C Safety Systems

  20. The Change of Planned Happenstance Skills and Its Association with Career-Related Variables during School-to-Work Transition

    Science.gov (United States)

    Yang, NaYeon; Yaung, Huk; Noh, Hyunkyung; Jang, Sun Hee; Lee, Bora

    2017-01-01

    The current study examined how planned happenstance skills (i.e., curiosity, flexibility, persistence, optimism, and risk-taking) changed during school-to-work transition and how career-related variables were associated with the initial levels and change rates of planned happenstance skills. In a sample of 307 South Korean college students, all…

  1. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  2. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond

  3. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    Science.gov (United States)

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  4. Soil Vapor Extraction and Bioventing Test Work Plan for the MOGAS Site, Myrtle Beach Air Force Base, South Carolina

    National Research Council Canada - National Science Library

    1995-01-01

    This work plan presents an evaluation of soil vapor extraction (SVE) and bioventing, and describes the SVE pilot scale and bioventing activities to be conducted to extract and treat soil gas at Installation Restoration Program (IRP...

  5. Bioventing Pilot Test Work Plan for Site ST200 (SA38), McClellan Air Force Base, California

    National Research Council Canada - National Science Library

    1997-01-01

    This Bioventing Pilot Test Work Plan presents the scope of an in situ bioventing pilot test and installation of a bioventing system for treatment of petroleum hydrocarbon-contaminated soils at Site...

  6. Safeguard Measures for Implementation of New Round of Land Consolidation Planning

    Institute of Scientific and Technical Information of China (English)

    LI Chen; LIU Xin-feng; PENG Zhe; SI Tao

    2012-01-01

    We conduct a comprehensive analysis of the current situation of security system for implementation of China’s land consolidation planning. The prominent problems in the process of implementing safeguard measures for planning are summarized as follows: the guiding ideology for planning formulation is imperfect; the legal basis is weak, and administrative means are not sound; the economic security mechanism is not brought into full play, and the social security measures still need to be further deepened; the technical safeguard measures are short. From laws and regulations, administrative management, economic security, social supervision, technology management and other aspects, we establish the scientific security system for implementation of land consolidation planning; put forth the recommendations for guaranteeing the implementation of planning in China.

  7. Work-Family Balancing and Working Time: What Measures are Available to Canadian Workers and What Measures should Employers Develop?

    OpenAIRE

    Diane-Gabrielle Tremblay; Elmustapha Najem; Renaud Paquet

    2007-01-01

    This article examines work-family balance. Data from the Workplace and Employee Survey (WES) was used to assess the overall situation of this phenomenon in Canada. Representative statistical data was used to determine to what extent employers have taken the work-family challenge into account. Our data indicate that the progress observed regarding the social debate on work-family balance has not necessarily translated into a marked improvement in facilitating conditions in workplaces and that ...

  8. 45 CFR 270.7 - What data will we use to measure performance on the work support and other measures?

    Science.gov (United States)

    2010-10-01

    ... measure performance on the work support and other measures? (a) We will use Census Bureau data to rank... 45 Public Welfare 2 2010-10-01 2010-10-01 false What data will we use to measure performance on the work support and other measures? 270.7 Section 270.7 Public Welfare Regulations Relating to Public...

  9. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  10. Measuring the Value of Succession Planning and Management: A Qualitative Study of Multinational Companies

    Science.gov (United States)

    Kim, Yeonsoo

    2010-01-01

    This article proposes a model for planning and operating an effective succession planning and management (SP&M) program and measuring its value. The nature of the research is exploratory, following a qualitative approach using in-depth interviews. Representatives of multinational companies interviewed for this study revealed that succession…

  11. 78 FR 37741 - Approval and Promulgation of Implementation Plans; California; South Coast; Contingency Measures...

    Science.gov (United States)

    2013-06-24

    ... deliver: Marty Robin, Office of Air Planning (AIR- 2), U.S. Environmental Protection Agency Region 9, 75... INFORMATION CONTACT: Doris Lo, Air Planning Office (AIR-2), U.S. Environmental Protection Agency, Region 9... statute precludes a State from implementing such measures before they are triggered. See, e.g., LEAN v...

  12. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    International Nuclear Information System (INIS)

    Dail, J.L.; Nanstad, L.D.; White, R.K.

    1995-06-01

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ''scores'' and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process

  13. Measures related to traffic planning for air pollution control

    Energy Technology Data Exchange (ETDEWEB)

    Baumueller, J; Reuter, U [Office of Environmental Protection, Stuttgart (Germany). Dept. for Climatology

    1996-12-31

    The immense increase of motor traffic, in the future reinforced by the European market and the opening of boarders to the east countries, requires new efforts in traffic policy. In the city agglomerations the motor traffic is nearly collapsing. The increase of motor traffic is the reason for a considerable degradation of environment, especially by noise and air pollution. For the region of Stuttgart the problems and possibilities of counter-measures are discussed. (author)

  14. Measures related to traffic planning for air pollution control

    Energy Technology Data Exchange (ETDEWEB)

    Baumueller, J.; Reuter, U. [Office of Environmental Protection, Stuttgart (Germany). Dept. for Climatology

    1995-12-31

    The immense increase of motor traffic, in the future reinforced by the European market and the opening of boarders to the east countries, requires new efforts in traffic policy. In the city agglomerations the motor traffic is nearly collapsing. The increase of motor traffic is the reason for a considerable degradation of environment, especially by noise and air pollution. For the region of Stuttgart the problems and possibilities of counter-measures are discussed. (author)

  15. NEAMS Software Licensing, Release, and Distribution: Implications for FY2013 Work Package Planning

    International Nuclear Information System (INIS)

    Bernholdt, David E.

    2012-01-01

    The vision of the NEAMS program is to bring truly predictive modeling and simulation (M and S) capabilities to the nuclear engineering community in order to enable a new approach to the analysis of nuclear systems. NEAMS anticipates issuing in FY 2018 a full release of its computational 'Fermi Toolkit' aimed at advanced reactor and fuel cycles. The NEAMS toolkit involves extensive software development activities, some of which have already been underway for several years, however, the Advanced Modeling and Simulation Office (AMSO), which sponsors the NEAMS program, has not yet issued any official guidance regarding software licensing, release, and distribution policies. This motivated an FY12 task in the Capability Transfer work package to develop and recommend an appropriate set of policies. The current preliminary report is intended to provide awareness of issues with implications for work package planning for FY13. We anticipate a small amount of effort associated with putting into place formal licenses and contributor agreements for NEAMS software which doesn't already have them. We do not anticipate any additional effort or costs associated with software release procedures or schedules beyond those dictated by the quality expectations for the software. The largest potential costs we anticipate would be associated with the setup and maintenance of shared code repositories for development and early access to NEAMS software products. We also anticipate an opportunity, with modest associated costs, to work with the Radiation Safety Information Computational Center (RSICC) to clarify export control assessment policies for software under development.

  16. Particularities of Expropriation Works for Highways and Regional Planning in Romania

    Science.gov (United States)

    Moscovici, Anca-Maria; Constantin Musat, Cosmin

    2017-10-01

    In the actual context of modernization and development of the road and railway infrastructure of Romania, we have to make some expropriation works. These works can assure the legal basis on which a said patch will be transferred from a private owner to the ownership of the Romanian state in order to be used for public interest, while the original owner would receive compensation for the patch of land. In this paper we wish to address the particularities of expropriation for highways and regional planning that provide the legal basis by which an estate passes from private property to state ownership in the public interest needs, none the less compensation being paid. In 2006-2007 began the first works of expropriation of land, on the Arad-Timisoara motorway section, under Government Decision no. 1546/2006. The motorway section we will bring up for discussion in 2016 is situated in the administrative-territorial division Galda de Jos, Alba Iulia County. For patches affected by the highway corridor, if it is to expropriate part of the patch, the cadastral documentation has to be established individually for each resulting lot, respectively for the lot/lots that remain in the ownership of the original owner, but also for the expropriated lot.

  17. Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-10-01

    The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

  18. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation

  19. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  20. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  1. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  2. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  3. Work plan for new SY tank farm exhauster, on-site fabrication activities

    International Nuclear Information System (INIS)

    McClees, J.

    1994-01-01

    The replacement SY tank farm exhauster unit is a new piece of equipment, designed to replace the existing SY tank farm K1 Ventilation System exhauster unit. This work plan describes the shop fabrication activities associated with the receiving, assembly, repair, modification, and testing of the new SY tank farm primary exhauster. A general list of these activities include, but are not limited to: repair all shipping damages, including procurement of replacement parts; fabricate hardware needed to install exhauster in the field (e.g., Vent duct tie-in, duct concrete footings/hangers, stack concrete footings, etc.); incorporate equipment modification as provided by WHC Engineering (e.g., Rewire the Alarm Annunciator Cabinet as fail-safe, connections between the exhauster and stack sample cabinet, etc.); test the entire exhauster unit, to the extent possible, prior to field installation; and prepare exhauster unit for transfer to and installation at SY tank farm

  4. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  5. Work plan for the retrieval of contaminated soil from the 116-F-4 soil storage unit

    International Nuclear Information System (INIS)

    Ludowise, J.D.

    1996-07-01

    The 116-F-4 pluto crib was excavated in 1993 as a treatability test to study field radionuclide analysis and dust control techniques. Approximately 410 m3 (540 yd3) of contaminated soil was removed from the crib and stored in a modular soil storage unit in the southwest corner of the 105-F exclusion area. In 1996, the waste will be retrieved from the storage unit and the storage unit will be dismantled. The waste and dismantled storage unit will be loaded and transported to the Environmental Restoration Disposal Facility. The purpose of this work plan is to provide guidance for retrieval and disposal of the 116-F-4 pluto crib contaminated soil and associated storage unit

  6. Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, P.; Biang, R.; Dolak, D.; Dunn, C.; Haffenden, R.; Martino, L.; Patton, T.; Wang, Y.; Yuen, C.

    1995-03-01

    The purpose of an RI/FS is to characterize the nature and extent of the risks posed by contaminants present at a site and to develop and evaluate options for remedial actions. The overall objective of the RI is to provide a comprehensive evaluation of site conditions, types and quantities of contaminants present, release mechanisms and migration pathways, target populations, and risks to human health and the environment. The information developed during the RI provides the basis for the design and implementation of remedial actions during the FS. The purpose of this RI Work Plan is to define the tasks that will direct the remedial investigation of the J-Field site at APG.

  7. Atmospheric chemistry: Description of the area of performance and a working plan

    Science.gov (United States)

    Kirchhoff, Volker W. J. H.

    1986-11-01

    INPE's program in Atmospheric Chemistry Research is described. Research in this area is concerned with atmospheric gases and their chemical reactions, production and loss rates, and their interactions with the biosphere. Atmospheric chemistry includes concepts in Physics, Chemistry, Meteorology, and Biology, which gives it a strong interdisciplinary character. The interaction of some of the atmospheric gases with the biosphere, such as ozone, is very strong and direct. Studying atmospheric chemistry is, therefore, of direct interest to man and the quality of life. Details are described to define the objectives of study, in particular those of our research program at INPE. A working plan is proposed in order to reach the defined goals. Owing to the large anthropogenic interference in the balance of the natural atmosphere it is anticipated that a better understanding of Atmospheric Chemistry will be the great scientific challenge of the next decade.

  8. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    Wells, J.L.

    1997-01-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  9. Test plan for in situ stress measurement system development

    International Nuclear Information System (INIS)

    Kim, K.

    1981-09-01

    The tests are to be performed to provide information regarding the state of stress of the basalt rock beneath the Hanford Site. This test series is designed to obtain information necessary to determine if hydrofracturing stress measurement is feasible in a fractured basalt medium. During the course of these field tests, it will be attempted to adapt the conventional hydrofracturing test method and analysis techniques to the basalt medium. If the test is shown to be feasible, more holes will be identified for testing. A comprehensive in situ stress determination program will be initiated. 2 figs

  10. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure

  11. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

  12. The Removal Action Work Plan for CPP-603A Basin Facility

    International Nuclear Information System (INIS)

    B. T. Richards

    2006-01-01

    This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center

  13. Work plan for conducting an ecological risk assessment at J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Hlohowskyj, I.; Hayse, J.; Kuperman, R. [Argonne National Lab., IL (United States). Environmental Assessment Div.] [and others

    1995-03-01

    The Environmental Management Division of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study (RI/FS) of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. J-Field is within the Edgewood Area of APG in Harford County, Maryland, and activities at the Edgewood Area since World War II have included the development, manufacture, testing, and destruction of chemical agents and munitions. The J-Field site was used to destroy chemical agents and munitions by open burning and open detonation. This work plan presents the approach proposed to conduct an ecological risk assessment (ERA) as part of the RI/FS program at J-Field. This work plan identifies the locations and types of field studies proposed for each area of concern (AOC), the laboratory studies proposed to evaluate toxicity of media, and the methodology to be used in estimating doses to ecological receptors and discusses the approach that will be used to estimate and evaluate ecological risks at J-Field. Eight AOCs have been identified at J-Field, and the proposed ERA is designed to evaluate the potential for adverse impacts to ecological receptors from contaminated media at each AOC, as well as over the entire J-Field site. The proposed ERA approach consists of three major phases, incorporating field and laboratory studies as well as modeling. Phase 1 includes biotic surveys of the aquatic and terrestrial habitats, biological tissue sampling and analysis, and media toxicity testing at each AOC and appropriate reference locations. Phase 2 includes definitive toxicity testing of media from areas of known or suspected contamination or of media for which the Phase 1 results indicate toxicity or adverse ecological effects. In Phase 3, the uptake models initially developed in Phase 2 will be finalized, and contaminant dose to each receptor from all complete pathways will be estimated.

  14. Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-03-12

    This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e

  15. A survey of the family planning work done in Dongguan County.

    Science.gov (United States)

    Wang, L; Hu, F; Liu, F

    1985-08-01

    The total fertility rate of women of childbearing age of Dongguan County in China has been decreasing gradually from 5.9 during the period following the liberation in 1949 to 2.05 in 1982. In order to encourage young couples to implement the policy of family planning consciously, the people's government of Dongguan county decided in July 1980 that all cadres and employees in county towns who received 1-child certificates would be exempted from house rent of 45 square meters from the time they get their certificates and would be allocated a living space of a 2-children family until their children reached age 16. It also stipulated that every couple could enjoy 1 month's holiday every year for 3 years and during the holiday, their salary, bonus and rate of attendance would not be affected. Because women bear less children today, they are relieved from heavy household chores and become the main working force in collective production. As a result, the development of town-run enterprises was stimulated and the total industrial output value of these enterprises increased. The average monthly salary of each female worker is about 100 yuan. In 1984, the average income per capita of the country rose to 649.2 yuan. The implementation of family planning work has eased the tension in the education field. Previously, because of the large number of school-age children in rural areas, teachers had to teach 2 classes. In the past 4 years, great emphasis was laid on intellectual investment. During this period, 2351 schools were built and several fundraising projects were implemented. Since 1981, more than 200 new running water projects were built, and new public services have been developed, including old age homes.

  16. Work-zone traffic performance measures : tech transfer summary.

    Science.gov (United States)

    2013-09-01

    The Federal Highway Administration (FHWA) 2004 Work Zone Safety and Mobility Rule applies to all state and local government agencies that receive federal-aid highway funding after October 12, 2007. This rule was an update to the former regulation (23...

  17. PART-TIME WORK AS A PRE-RETIREMENT MEASURE

    CERN Document Server

    Human Resources Division

    2001-01-01

    Upon the proposal of the Standing Concertation Committee at its meeting on 9 and 10 October 2001, the Director-General has approved the extension of this part-time work scheme for requested effective dates commencing not later than 1 January 2003.

  18. Measuring Bus Drivers' Occupational Stress Under Changing Working Conditions

    NARCIS (Netherlands)

    Hlotova, Y.; Cats, O.; Meijer, S.A.

    2014-01-01

    Stress is an immense problem in modern society; approximately half of all occupational illnesses are directly or indirectly related to stress. The work of a bus driver is typically associated with high stress levels that negatively influence individual well-being as well as workforce management. The

  19. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  20. Theoretical Antecedents of Standing at Work: An Experience Sampling Approach Using the Theory of Planned Behavior

    Science.gov (United States)

    Meyer, M. Renée Umstattd; Wu, Cindy; Walsh, Shana M.

    2016-01-01

    Time spent sitting has been associated with an increased risk of diabetes, cancer, obesity, and mental health impairments. However, 75% of Americans spend most of their days sitting, with work-sitting accounting for 63% of total daily sitting time. Little research examining theory-based antecedents of standing or sitting has been conducted. This lack of solid groundwork makes it difficult to design effective intervention strategies to decrease sitting behaviors. Using the Theory of Planned Behavior (TPB) as our theoretical lens to better understand factors related with beneficial standing behaviors already being practiced, we examined relationships between TPB constructs and time spent standing at work among “positive deviants” (those successful in behavior change). Experience sampling methodology (ESM), 4 times a day (midmorning, before lunch, afternoon, and before leaving work) for 5 consecutive workdays (Monday to Friday), was used to assess employees' standing time. TPB scales assessing attitude (α = 0.81–0.84), norms (α = 0.83), perceived behavioral control (α = 0.77), and intention (α = 0.78) were developed using recommended methods and collected once on the Friday before the ESM surveys started. ESM data are hierarchically nested, therefore we tested our hypotheses using multilevel structural equation modeling with Mplus. Hourly full-time university employees (n = 50; 70.6% female, 84.3% white, mean age = 44 (SD = 11), 88.2% in full-time staff positions) with sedentary occupation types (time at desk while working ≥6 hours/day) participated. A total of 871 daily surveys were completed. Only perceived behavioral control (β = 0.45, p deviance approach to enhance perceived behavioral control, in addition to implementing environmental changes like installing standing desks. PMID:29546189

  1. Measurement plans for process flow improvement in services and health care

    NARCIS (Netherlands)

    Kemper, B.; de Mast, J.

    2013-01-01

    The discussion of performance measurement is often on a conceptual, not operational, level; advice on the operational and practical matters of obtaining data for process flow improvement is scarce. We define a measurement plan and study four measurement study designs and corresponding methods and

  2. Atmospheric Radiation Measurement (ARM) Climate Research Facility Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mather, James [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-04-01

    Mission and Vision Statements for the U.S. Department of Energy (DOE)’s Atmospheric Radiation Measurement (ARM) Climate Research Facility Mission The ARM Climate Research Facility, a DOE scientific user facility, provides the climate research community with strategically located in situ and remote-sensing observatories designed to improve the understanding and representation, in climate and earth system models, of clouds and aerosols as well as their interactions and coupling with the Earth’s surface. Vision To provide a detailed and accurate description of the Earth atmosphere in diverse climate regimes to resolve the uncertainties in climate and Earth system models toward the development of sustainable solutions for the nation's energy and environmental challenges.

  3. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  4. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A. [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  5. Measuring work engagement among community health workers in Sierra Leone: Validating the Utrecht Work Engagement Scale

    OpenAIRE

    Vallières, Frédérique; McAuliffe, Eilish; Hyland, Philip; Galligan, Marie; Ghee, Annette

    2017-01-01

    This study examines the concept of volunteer work engagement in a sample of 334 community health workers in Bonthe District, Sierra Leone. Structural equation modelling was used to validate both the 9-item and the 17-item Utrecht Work Engagement Scale (UWES-9 and UWES-17, respectively). Results assessing the UWES-17 invalidated the three-factor structure within this cohort of community health workers, as high correlations were found between latent factors. Findings for the validity of the UWE...

  6. Fabrication and Measurement of Low Work Function Cesiated Dispenser Photocathodes

    CERN Document Server

    Moody, Nathan A; Jensen, Kevin

    2005-01-01

    Photoinjector performance is a limiting factor in the continued development of high powered FELs and electron beam-based accelerators. Presently available photocathodes are plagued with limited efficiency and short lifetime in an RF-gun environment, due to contamination or evaporation of a photosensitive surface layer. An ideal photocathode should have high efficiency at long wavelengths, long lifetime in practical vacuum environments, and prompt emission. Cathodes with high efficiency typically have limited lifetime, and vice versa, and the needs of the photocathode are generally at odds with those of the drive laser. A potential solution is the low work function dispenser cathode, where lifetime issues are overcome by periodic in situ regeneration that restores the photosensitive surface layer, analogous to those used in the microwave power tube industry. This work reports on the fabrication techniques and performance of cesiated metal photocathodes and cesiated dispenser cathodes, with a focus on understan...

  7. Comparison of a Restricted and Unrestricted Vegan Diet Plan with a Restricted Omnivorous Diet Plan on Health-Specific Measures.

    Science.gov (United States)

    Bloomer, Richard J; Gunnels, Trint A; Schriefer, JohnHenry M

    2015-07-14

    We have previously noted beneficial health outcomes when individuals follow a dietary restriction plan in accordance with the Daniel Fast (DF). This is true whether individuals eliminate all animal products or include small amounts of meat and dairy in their plan. The present study sought to compare anthropometric and biochemical measures of health in individuals following a traditional DF (i.e., restricted vegan) or modified DF (i.e., restricted omnivorous; inclusive of ad libitum meat and skim milk consumption), with those following an unrestricted vegan diet plan. 35 subjects (six men; 29 women; 33 ± 2 years; range: 18-67 years) completed a 21-day diet plan. Subjects reported to the lab for pre- (day 1) and post-intervention testing (day 22) in a 10 h fasted state. Blood samples were collected and assayed for complete blood count, metabolic panel, lipid panel, insulin, HOMA-IR, C-reactive protein, and oxidative stress biomarkers (malondialdehyde, advanced oxidation protein products, and nitrate/nitrite). Heart rate and blood pressure were measured and body composition was determined via dual energy X-ray absorptiometry. Subjects' self-reported compliance, mental and physical health, and satiety in relation to the dietary modification were recorded. No interaction effects were noted for our outcome measures (p > 0.05). However, subjects in the traditional DF group reported an approximate 10% increase in perceived mental and physical health, with a 25% reduction in malondialdehyde and a 33% reduction in blood insulin. Systolic BP was reduced approximately 7 mmHg in subjects assigned to the traditional DF, with an approximate 5 mmHg reduction in subjects assigned to the modified DF and the unrestricted vegan plan. A small (2 mmHg) reduction in diastolic BP was noted for subjects in both DF groups; a slight increase in diastolic BP was noted for subjects assigned to the unrestricted vegan group. An approximate 20% reduction was noted in total and LDL cholesterol

  8. Comparison of a Restricted and Unrestricted Vegan Diet Plan with a Restricted Omnivorous Diet Plan on Health-Specific Measures

    Directory of Open Access Journals (Sweden)

    Richard J. Bloomer

    2015-07-01

    Full Text Available Background: We have previously noted beneficial health outcomes when individuals follow a dietary restriction plan in accordance with the Daniel Fast (DF. This is true whether individuals eliminate all animal products or include small amounts of meat and dairy in their plan. The present study sought to compare anthropometric and biochemical measures of health in individuals following a traditional DF (i.e., restricted vegan or modified DF (i.e., restricted omnivorous; inclusive of ad libitum meat and skim milk consumption, with those following an unrestricted vegan diet plan. Methods: 35 subjects (six men; 29 women; 33 ± 2 years; range: 18–67 years completed a 21-day diet plan. Subjects reported to the lab for pre- (day 1 and post-intervention testing (day 22 in a 10 h fasted state. Blood samples were collected and assayed for complete blood count, metabolic panel, lipid panel, insulin, HOMA-IR, C-reactive protein, and oxidative stress biomarkers (malondialdehyde, advanced oxidation protein products, and nitrate/nitrite. Heart rate and blood pressure were measured and body composition was determined via dual energy X-ray absorptiometry. Subjects’ self-reported compliance, mental and physical health, and satiety in relation to the dietary modification were recorded. Results: No interaction effects were noted for our outcome measures (p > 0.05. However, subjects in the traditional DF group reported an approximate 10% increase in perceived mental and physical health, with a 25% reduction in malondialdehyde and a 33% reduction in blood insulin. Systolic BP was reduced approximately 7 mmHg in subjects assigned to the traditional DF, with an approximate 5 mmHg reduction in subjects assigned to the modified DF and the unrestricted vegan plan. A small (2 mmHg reduction in diastolic BP was noted for subjects in both DF groups; a slight increase in diastolic BP was noted for subjects assigned to the unrestricted vegan group. An approximate 20

  9. Comparison of a Restricted and Unrestricted Vegan Diet Plan with a Restricted Omnivorous Diet Plan on Health-Specific Measures

    Science.gov (United States)

    Bloomer, Richard J.; Gunnels, Trint A.; Schriefer, JohnHenry M.

    2015-01-01

    Background: We have previously noted beneficial health outcomes when individuals follow a dietary restriction plan in accordance with the Daniel Fast (DF). This is true whether individuals eliminate all animal products or include small amounts of meat and dairy in their plan. The present study sought to compare anthropometric and biochemical measures of health in individuals following a traditional DF (i.e., restricted vegan) or modified DF (i.e., restricted omnivorous; inclusive of ad libitum meat and skim milk consumption), with those following an unrestricted vegan diet plan. Methods: 35 subjects (six men; 29 women; 33 ± 2 years; range: 18–67 years) completed a 21-day diet plan. Subjects reported to the lab for pre- (day 1) and post-intervention testing (day 22) in a 10 h fasted state. Blood samples were collected and assayed for complete blood count, metabolic panel, lipid panel, insulin, HOMA-IR, C-reactive protein, and oxidative stress biomarkers (malondialdehyde, advanced oxidation protein products, and nitrate/nitrite). Heart rate and blood pressure were measured and body composition was determined via dual energy X-ray absorptiometry. Subjects’ self-reported compliance, mental and physical health, and satiety in relation to the dietary modification were recorded. Results: No interaction effects were noted for our outcome measures (p > 0.05). However, subjects in the traditional DF group reported an approximate 10% increase in perceived mental and physical health, with a 25% reduction in malondialdehyde and a 33% reduction in blood insulin. Systolic BP was reduced approximately 7 mmHg in subjects assigned to the traditional DF, with an approximate 5 mmHg reduction in subjects assigned to the modified DF and the unrestricted vegan plan. A small (2 mmHg) reduction in diastolic BP was noted for subjects in both DF groups; a slight increase in diastolic BP was noted for subjects assigned to the unrestricted vegan group. An approximate 20% reduction was

  10. Theoretical Antecedents of Standing at Work: An Experience Sampling Approach Using the Theory of Planned Behavior.

    Science.gov (United States)

    Meyer, M Renée Umstattd; Wu, Cindy; Walsh, Shana M

    2016-01-01

    Time spent sitting has been associated with an increased risk of diabetes, cancer, obesity, and mental health impairments. However, 75% of Americans spend most of their days sitting, with work-sitting accounting for 63% of total daily sitting time. Little research examining theory-based antecedents of standing or sitting has been conducted. This lack of solid groundwork makes it difficult to design effective intervention strategies to decrease sitting behaviors. Using the Theory of Planned Behavior (TPB) as our theoretical lens to better understand factors related with beneficial standing behaviors already being practiced, we examined relationships between TPB constructs and time spent standing at work among "positive deviants" (those successful in behavior change). Experience sampling methodology (ESM), 4 times a day (midmorning, before lunch, afternoon, and before leaving work) for 5 consecutive workdays (Monday to Friday), was used to assess employees' standing time. TPB scales assessing attitude (α = 0.81-0.84), norms (α = 0.83), perceived behavioral control (α = 0.77), and intention (α = 0.78) were developed using recommended methods and collected once on the Friday before the ESM surveys started. ESM data are hierarchically nested, therefore we tested our hypotheses using multilevel structural equation modeling with Mplus. Hourly full-time university employees (n = 50; 70.6% female, 84.3% white, mean age = 44 (SD = 11), 88.2% in full-time staff positions) with sedentary occupation types (time at desk while working ≥6 hours/day) participated. A total of 871 daily surveys were completed. Only perceived behavioral control (β = 0.45, p work-standing at the event-level (model fit: just fit); mediation through intention was not supported. This is the first study to examine theoretical antecedents of real-time work-standing in a naturalistic field setting among positive deviants. These relationships should be further examined, and behavioral intervention

  11. Theoretical Antecedents of Standing at Work: An Experience Sampling Approach Using the Theory of Planned Behavior

    Directory of Open Access Journals (Sweden)

    M. Renée Umstattd Meyer

    2016-09-01

    Full Text Available Time spent sitting has been associated with an increased risk of diabetes, cancer, obesity, and mental health impairments. However, 75% of Americans spend most of their days sitting, with work-sitting accounting for 63% of total daily sitting time. Little research examining theory-based antecedents of standing or sitting has been conducted. This lack of solid groundwork makes it difficult to design effective intervention strategies to decrease sitting behaviors. Using the Theory of Planned Behavior (TPB as our theoretical lens to better understand factors related with beneficial standing behaviors already being practiced, we examined relationships between TPB constructs and time spent standing at work among “positive deviants” (those successful in behavior change. Experience sampling methodology (ESM, 4 times a day (midmorning, before lunch, afternoon, and before leaving work for 5 consecutive workdays (Monday to Friday, was used to assess employees’ standing time. TPB scales assessing attitude (α = 0.81–0.84, norms (α = 0.83, perceived behavioral control (α = 0.77, and intention (α = 0.78 were developed using recommended methods and collected once on the Friday before the ESM surveys started. ESM data are hierarchically nested, therefore we tested our hypotheses using multilevel structural equation modeling with Mplus. Hourly full-time university employees (n = 50; 70.6% female, 84.3% white, mean age = 44 (SD = 11, 88.2%in full-time staff positions with sedentary occupation types (time at desk while working ≥6 hours/day participated. A total of 871 daily surveys were completed. Only perceived behavioral control (β = 0.45, p < 0.05 was related with work-standing at the event-level (model fit: just fit; mediation through intention was not supported. This is the first study to examine theoretical antecedents of real-time work-standing in a naturalistic field setting among positive deviants. These relationships should be further

  12. Engineering work plan for PFP criticality alarm panel first unit re-build

    International Nuclear Information System (INIS)

    Clem, W.E.

    1994-01-01

    This document describes the first step in increasing the quality, reliability, and ease of maintenance of the nine Criticality Alarm Panels (CAP) at PFP. Development control practices and guidelines of WHC-CM-6-1, EP-2.4 and WHC-IP-1026, EPG-2.4 are applied to develop a prototype of a replacement Criticality Alarm Panel (CAP) with facility-use potential. During the development of the prototype CAP, the design requirements of all of PFP's nine CAPs are considered to develop standardized hardware and detailed design drawings that are tailored to PFP maintenance needs. Increased quality and reliability is achieved through quality hardware, proven technology and design techniques, and the use of the Class 1E workmanship standards of WHC-CM-8-1. The end result of the work described by this work plan is a verified/read-to-install replacement for CAP Z4 and verified/released H-2 drawings that are formatted such that they can easily be replicated when producing design drawings for the other eight CAPs

  13. The prospective relationship between work stressors and cardiovascular disease, using a comprehensive work stressor measure for exposure assessment.

    Science.gov (United States)

    Szerencsi, Karolina; van Amelsvoort, Ludovic; Prins, Martin; Kant, Ijmert

    2014-02-01

    The currently used instruments which measure the psychosocial work environment have been criticized. We analyzed the association between work stressors and cardiovascular disease, using the Maastricht Cohort Study Work Stressor Score (MCS-WSS), a comprehensive measure which has been associated with work strain. At baseline 11,489 employees of the Maastricht Cohort Study were participating. This prospective cohort study started in 1998 in the Netherlands and includes a heterogeneous population of employees. The psychosocial work environment, cardiovascular risk factors and the occurrence of cardiovascular disease were measured with questionnaires at various time points during follow-up, the last follow-up was in 2008. For a subsample of employees, CVD extracted from medical records was available. The MCS-WSS consists of items from emotional demands, psychological demands, role clarity, career possibilities, working overtime, job insecurity, cognitive demands, skills discretion and decision authority. Each item has its own contribution in inducing work strain, represented by its own weighting factor. The association between a high exposure to work stressors at baseline and cardiovascular morbidity was assessed with Cox regression analyses. Analyses were adjusted for age, gender, educational level, smoking, body mass index, alcohol consumption and leisure physical activity. During a median follow-up of 49 months, 309 employees developed incident cardiovascular disease. Overall, no significant associations were found between a high exposure to work stressors at baseline and cardiovascular morbidity. The results of this study indicate that high exposure to work stressors has no considerable impact on cardiovascular disease.

  14. Contribution of Reactive and Proactive Control to Children's Working Memory Performance: Insight from Item Recall Durations in Response Sequence Planning

    Science.gov (United States)

    Chevalier, Nicolas; James, Tiffany D.; Wiebe, Sandra A.; Nelson, Jennifer Mize; Espy, Kimberly Andrews

    2014-01-01

    The present study addressed whether developmental improvement in working memory span task performance relies upon a growing ability to proactively plan response sequences during childhood. Two hundred thirteen children completed a working memory span task in which they used a touchscreen to reproduce orally presented sequences of animal names.…

  15. Measuring Discrimination in Education. NBER Working Paper No. 15057

    Science.gov (United States)

    Hanna, Rema; Linden. Leigh

    2009-01-01

    In this paper, we illustrate a methodology to measure discrimination in educational contexts. In India, we ran an exam competition through which children compete for a large financial prize. We recruited teachers to grade the exams. We then randomly assigned child "characteristics" (age, gender, and caste) to the cover sheets of the…

  16. Food parenting measurement issues: Working group consensus report

    Science.gov (United States)

    Childhood obesity is a growing problem. As more researchers become involved in the study of parenting influences on childhood obesity, there appears to be a lack of agreement regarding the most important parenting constructs of interest, definitions of those constructs, and measurement of those cons...

  17. Planning GPS Measurements of a Linear Object for a Specified Time Interval

    Directory of Open Access Journals (Sweden)

    Specht Cezary

    2017-12-01

    Full Text Available The previous measurement campaigns planning used in geodesy is conducted exclusively for individual points. For the natural process aimed at the adoption of the introduction of the planning (prediction of constellation state in navigation, which is characterized by the movement, one should adopt measurement campaigns planning for linear objects. In contrast to the existing planning solutions, focused on point presentation of the state of the constellation of navigation system, the author of this article rearranges the proposal of determination of geometrical factors, and their summation. In the presented simulation, one has specified the route of passing at certain times and it was assumed that the receiver will move with variable motion. One has defined the geometric ratios (PDOP, which allow to distinguish the results corresponding to the adopted criteria for the measurement of linear object to be conducted with the best possible accuracy.

  18. Technical Work Plan for: Near Field Environment: Engineered Barrier System: Radionuclide Transport Abstraction Model Report

    International Nuclear Information System (INIS)

    J.D. Schreiber

    2006-01-01

    This technical work plan (TWP) describes work activities to be performed by the Near-Field Environment Team. The objective of the work scope covered by this TWP is to generate Revision 03 of EBS Radionuclide Transport Abstraction, referred to herein as the radionuclide transport abstraction (RTA) report. The RTA report is being revised primarily to address condition reports (CRs), to address issues identified by the Independent Validation Review Team (IVRT), to address the potential impact of transport, aging, and disposal (TAD) canister design on transport models, and to ensure integration with other models that are closely associated with the RTA report and being developed or revised in other analysis/model reports in response to IVRT comments. The RTA report will be developed in accordance with the most current version of LP-SIII.10Q-BSC and will reflect current administrative procedures (LP-3.15Q-BSC, ''Managing Technical Product Inputs''; LP-SIII.2Q-BSC, ''Qualification of Unqualified Data''; etc.), and will develop related Document Input Reference System (DIRS) reports and data qualifications as applicable in accordance with prevailing procedures. The RTA report consists of three models: the engineered barrier system (EBS) flow model, the EBS transport model, and the EBS-unsaturated zone (UZ) interface model. The flux-splitting submodel in the EBS flow model will change, so the EBS flow model will be validated again. The EBS transport model and validation of the model will be substantially revised in Revision 03 of the RTA report, which is the main subject of this TWP. The EBS-UZ interface model may be changed in Revision 03 of the RTA report due to changes in the conceptualization of the UZ transport abstraction model (a particle tracker transport model based on the discrete fracture transfer function will be used instead of the dual-continuum transport model previously used). Validation of the EBS-UZ interface model will be revised to be consistent with

  19. Measures of work-family conflict predict sickness absence from work.

    Science.gov (United States)

    Clays, Els; Kittel, France; Godin, Isabelle; Bacquer, Dirk De; Backer, Guy De

    2009-08-01

    To examine the relation between work-family conflict and sickness absence. The BELSTRESS III study comprised 2983 middle-aged workers. Strain-based work-home interference (WHI) and home-work interference (HWI) were assessed by means of self-administered questionnaires. Prospective data of registered sickness absence during 12-months follow-up were collected. Multiple logistic regression analysis was conducted. HWI was positively and significantly related to high sickness absence duration (at least 10 sick leave days) and high sickness absence frequency (at least 3 sick leave episodes) in men and women, also after adjustments were made for sociodemographic variables, health indicators, and environmental psychosocial factors. In multivariate analysis, no association between WHI and sickness absence was found. HWI was positively and significantly related to high sickness absence duration and frequency during 12-months follow-up in male and female workers.

  20. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  1. Measuring work engagement among community health workers in Sierra Leone: Validating the Utrecht Work Engagement Scale

    Directory of Open Access Journals (Sweden)

    Frédérique Vallières

    2017-04-01

    Full Text Available This study examines the concept of volunteer work engagement in a sample of 334 community health workers in Bonthe District, Sierra Leone. Structural equation modelling was used to validate both the 9-item and the 17-item Utrecht Work Engagement Scale (UWES-9 and UWES-17, respectively. Results assessing the UWES-17 invalidated the three-factor structure within this cohort of community health workers, as high correlations were found between latent factors. Findings for the validity of the UWES-9 were largely consistent with those of the UWES-17. Model fit for the UWES-9 were generally equivalent for the one-factor, three-factor, and bifactor solutions, however the three-factor model was once again rejected due to high factor correlations. Based on these results, the current sample provides evidence that work engagement is best represented as a unidimensional construct in this context. Findings are considered alongside previous research to offer support for the utilization of the shortened UWES-9 in this context, as it appears to provide a good representation of work engagement and possess a parsimonious unidimensional scoring scheme.

  2. Measuring engagement at work: validation of the Chinese version of the Utrecht Work Engagement Scale.

    Science.gov (United States)

    Fong, Ted Chun-tat; Ng, Siu-man

    2012-09-01

    Work engagement is a positive work-related state of fulfillment characterized by vigor, dedication, and absorption. Previous studies have operationalized the construct through development of the Utrecht Work Engagement Scale. Apart from the original three-factor 17-item version of the instrument (UWES-17), there exists a nine-item shortened revised version (UWES-9). The current study explored the psychometric properties of the Chinese version of the Utrecht Work Engagement Scale in terms of factorial validity, scale reliability, descriptive statistics, and construct validity. A cross-sectional questionnaire survey was conducted in 2009 among 992 workers from over 30 elderly service units in Hong Kong. Confirmatory factor analyses revealed a better fit for the three-factor model of the UWES-9 than the UWES-17 and the one-factor model of the UWES-9. The three factors showed acceptable internal consistency and strong correlations with factors in the original versions. Engagement was negatively associated with perceived stress and burnout while positively with age and holistic care climate. The UWES-9 demonstrates adequate psychometric properties, supporting its use in future research in the Chinese context.

  3. Higgs Working Group Report of the Snowmass 2013 Community Planning Study

    CERN Document Server

    Dawson, S; Logan, H; Qian, J; Tully, C; Van Kooten, R; Ajaib, A; Anastassov, A; Anderson, I; Bake, O; Barger, V; Barklow, T; Batell, B; Battaglia, M; Berge, S; Blondel, A; Bolognesi, S; Brau, J; Brownson, E; Cahill-Rowley, M; Calancha-Paredes, C; Chen, C -Y; Chou, W; Clare, R; Cline, D; Craig, N; Cranmer, K; de Gruttola, M; Elagin, A; Essig, R; Everett, L; Feng, E; Fujii, K; Gainer, J; Gao, Y; Gogoladze, I; Gori, S; Goncalo, R; Graf, N; Grojean, C; Guindon, S; Han, T; Hanson, G; Harnik, R; Heinemann, B; Heinemeyer, S; Heintz, U; Hewett, J; Ilchenko, Y; Ismail, A; Jain, V; Janot, P; Kawada, S; Kehoe, R; Klute, M; Kotwal, A; Krueger, K; Kukartsev, G; Kumar, K; Kunkle, J; Lewis, I; Li, Y; Linssen, L; Lipeles, E; Lipton, R; Liss, T; List, J; Liu, T; Liu, Z; Low, I; Ma, T; Mackenzie, P; Mellado, B; Melnikov, K; Moortgat-Pick, G; Mourou, G; Narain, M; Nielsen, J; Okada, N; Okawa, H; Olsen, J; Onyisi, P; Parashar, N; Peskin, M; Petriello, F; Plehn, T; Pollard, C; Potter, C; Prokofiev, K; Rauch, M; Rizzo, T; Robens, T; Rodriguez, V; Roloff, P; Ruiz, R; Sanz, V; Sayre, J; Shafi, Q; Shaughnessy, G; Sher, M; Simon, F; Solyak, N; Stupak, J; Su, S; Tanabe, T; Tajima, T; Telnov, V; Tian, J; Thomas, S; Thomson, M; Un, C; Velasco, M; Wagner, C; Wang, S; Whitbeck, A; Yao, W; Yokoya, H; Zenz, S; Zerwas, D; Zhang, Y; Zhou, Y

    2013-01-01

    This report summarizes the work of the Energy Frontier Higgs Boson working group of the 2013 Community Summer Study (Snowmass). We identify the key elements of a precision Higgs physics program and document the physics potential of future experimental facilities as elucidated during the Snowmass study. We study Higgs couplings to gauge boson and fermion pairs, double Higgs production for the Higgs self-coupling, its quantum numbers and $C\\!P$-mixing in Higgs couplings, the Higgs mass and total width, and prospects for direct searches for additional Higgs bosons in extensions of the Standard Model. Our report includes projections of measurement capabilities from detailed studies of the Compact Linear Collider (CLIC), a Gamma-Gamma Collider, the International Linear Collider (ILC), the Large Hadron Collider High-Luminosity Upgrade (HL-LHC), Very Large Hadron Colliders up to 100 TeV (VLHC), a Muon Collider, and a Triple-Large Electron Positron Collider (TLEP).

  4. Working on the Work: An Action Plan for Teachers, Principals, and Superintendents. The Jossey-Bass Education Series.

    Science.gov (United States)

    Schlechty, Phillip C.

    This book, which is a companion to the books, "Shaking up the Schoolhouse" and "Inventing Better Schools," presents the Working on the Work (WOW) framework for improving student performance by improving the quality of schoolwork. Field-tested in schools nationwide, the framework describes the 12 essential components of a WOW…

  5. Geometrical Comparison Measures for Tumor Delineation, what do they mean for the Actual Dosis Plan?

    DEFF Research Database (Denmark)

    Hollensen, Christian; Persson, G.; Højgaard, L.

    2012-01-01

    Purpose/Objective: Gross tumour volume (GTV) delineation is central for radiotherapy planning. It provides the basis of the clinical target volume and finally the planning target volume (PTV) which is used for dose optimization. GTV delineations are prone to intermethod and inter......observer variation. In clinical studies this variation is commonly represented by geometrical volume comparison measures (GVCMs) as volume assessment, centre of mass and overlap. The correlation between these measures and the radiotherapy plan are however unclear. The aim of the present study is to investigate...... the correlation between GVCMs and the radiotherapy plans of patients with peripheral lung tumours. Materials and Methods: Peripheral lung tumours of 10 patients referred for stereotactic body radiotherapy in 2008 were delineated by 3 radiologists and 3 oncologists. From these GTV delineations 6 different...

  6. The Palau AHEC--academizing the public health work plan: capacity development and innovation in Micronesia.

    Science.gov (United States)

    Dever, Greg; Finau, Sitaleki; Kuartei, Stevenson; Durand, A Mark; Rykken, David; Yano, Victor; Untalan, Pedro; Withy, Kelley; Tellei, Patrick; Baravilala, Wame; Pierantozzi, Sandra; Tellei, Jullie

    2005-03-01

    The Palau Area Health Education Center (AHEC)--a program of the University of Hawaii's John A. Burns School of Medicine (JABSOM) and based at Palau Community College--was established in 2001 in response to the recommendations of the 1998 Institute of Medicine (IOM) report--Pacific Partnerships for Health--Charting a New Course for the 21st Century1. One of IOM's core recommendations was to promote the training of the primary health care workforce among the U.S.-Associated Pacific Islands. Since its inception in 2001, the Palau AHEC has coordinated overall 37 postgraduate and undergraduate courses in General Practice and Public Health taught by the University of Auckland Faculty of Medicine and Health Sciences and the Fiji School of Medicine's School of Public Health and Primary Care (SPH&PC) in Palau, Yap State, and the Republic of the Marshall Islands. Currently 139 physicians, nurses, health administrators, and environmental health workers are registered as active students in Palau (58), Yap State (22), and the RMI (59). Notably, the Palau AHEC and the SPH&PC have worked in an innovative partnership with the Palau Ministry of Health to operationalize the MOH's public health work plan to implement a comprehensive community health survey of all 4,376 households in Palau, interviewing 79% of the total population, to determine Palau's health indicators. To accomplish this, the SPH&PC developed and taught a curriculum for Palau physicians and public health nurses on how to design the survey, gather, and analyze data in order to develop and implement appropriately responsive intervention and treatment programs to address Palau's old and newer morbidities. In early FY2005, two other Micronesian AHECs--the Yap State and Commonwealth of the Northern Mariana Islands AHECs--were funded through JABSOM administered grants which will also address the primary care training needs of Micronesia's remote and isolated health workforce.

  7. The Development of an Instrument to Measure the Work Capability of People with Limited Work Capacity (LWC).

    Science.gov (United States)

    van Ruitenbeek, Gemma M C; Zijlstra, Fred R H; Hülsheger, Ute R

    2018-06-04

    Purpose Participation in regular paid jobs positively affects mental and physical health of all people, including people with limited work capacities (LWC), people that are limited in their work capacity as a consequence of their disability, such as chronic mental illness, psychological or developmental disorder. For successful participation, a good fit between on one hand persons' capacities and on the other hand well-suited individual support and a suitable work environment is necessary in order to meet the demands of work. However, to date there is a striking paucity of validated measures that indicate the capability to work of people with LWC and that outline directions for support that facilitate the fit. Goal of the present study was therefore to develop such an instrument. Specifically, we adjusted measures of mental ability, conscientiousness, self-efficacy, and coping by simplifying the language level of these measures to make the scales accessible for people with low literacy. In order to validate these adjusted self-report and observer measures we conducted two studies, using multi-source, longitudinal data. Method Study 1 was a longitudinal multi-source study in which the newly developed instrument was administered twice to people with LWC and their significant other. We statistically tested the psychometric properties with respect to dimensionality and reliability. In Study 2, we collected new multi-source data and conducted a confirmatory factor analysis (CFA). Results Studies yielded a congruous factor structure in both samples, internally consistent measures with adequate content validity of scales and subscales, and high test-retest reliability. The CFA confirmed the factorial validity of the scales. Conclusion The adjusted self-report and the observer scales of mental ability, conscientiousness, self-efficacy, and coping are reliable measures that are well-suited to assess the work capability of people with LWC. Further research is needed to

  8. Does Occupational Mobility Influence Health among Working Women? Comparing Objective and Subjective Measures of Work Trajectories

    Science.gov (United States)

    Wilkinson, Lindsay R.; Shippee, Tetyana P.; Ferraro, Kenneth F.

    2012-01-01

    Occupational mobility is highly valued in American society, but is it consequential to women's health? Previous studies have yielded inconsistent results, but most measured occupational mobility by identifying transitions across occupational categories. Drawing from cumulative inequality theory, this study (1) compares objective and subjective…

  9. Report of measures taken by a working group for emergency

    International Nuclear Information System (INIS)

    Saito, Tadashi

    2012-01-01

    Facing the Fukushima Daiichi Nuclear Power Plant Accident (Mar. 11, 2011), the annually specified working group (WG) in the title was urgently organized by the sections of experts in charge of radiation supervising and of radiation safe handling in the Japan Radioisotope Association and this is the report given by its sub-WG B among 4 of A-D. Sub-WG B, consisting from 7 members, was defined to be responsible for getting hold of situations of the radioactive spread/contamination, for radio-levels in foods/water, and for methods of radiometry/radio-analysis. They were also responsible for disclosing all of information concerned. On-request radiometry was conducted mainly in Osaka University using equipments of Ge-semiconductor detector, facing NaI(Tl) scintillation detector, imaging plate, GM- or NaI scintillation-survey meters, liquid scintillation detector, fluoro-glass dosimeter, plastic scintillator, photodiode and other self-manufactured devices. Sampling of soil and vegetables was performed in late March to early May at the northern areas of the Plant, which were thought undermanned after the Accident in contrast to south where there were radiation facilities like High Energy Accelerator Research Organization, Tsukuba City (KEK). Driving survey in Fukushima Prefecture was done in April, June and October with a car-loaded NaI survey meter for environmental dose distribution, and with NaI(Tl) detector and spectro-scaler for gamma spectrum, which detected peaks of 131 I, 134 Cs, 137 Cs and 136 Cs in April. Change of atmospheric 222 Rn level had been investigated nationwide on hypothesis of its possible quake-preceding phenomenon as it was observed before 1995 Hanshin/Awaji Earthquake. The phenomenon was found recorded in the exhaust monitor of Fukushima Medical University before this 2011 Earthquake. (T.T.)

  10. Bike to Work Day: A Potential Tool for Planning and Fostering Sustainable Mobility

    Directory of Open Access Journals (Sweden)

    Luis Claudio Brito Patricio

    2016-12-01

    Full Text Available Bike to Work Day (BTWD takes place all over the world and a nation-wide campaign was recently started in Brazil. Despite the growing interest, national research in this area is non-existent. This article seeks to investigate the impacts of such a campaign, using data collected on a survey in Curitiba that obtained 320 valid answers during BTWD 2015. Results showed that 38,4% of participants always commute by bike and 29,4% never or rarely commute by bike. The barriers and motivations are basically the same for both behavior groups. The main motivation was personal health and the main barrier was lack of cycling infrastructure. Origin and destination were also mapped pointing the downtown area as the most visited region. Although long term impacts weren't assessed, this research revealed the potential of a BTWD campaign to promote behavior change and also provide information about cyclists and their travel patterns, thus aiding cycling urban planning.

  11. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  12. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  13. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    International Nuclear Information System (INIS)

    Shaw, P.; Nickelson, D.; Hyde, R.

    1999-01-01

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA

  14. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  15. Status of the conversion working plan in the High Flux Reactor (Petten, The Netherlands)

    International Nuclear Information System (INIS)

    Hendriks, J.A.; Thijssen, P.J.M.; Wijtsma, F.J.; Gevers, A.; Guidez, J.

    2000-01-01

    The conversion from HEU to LEU has often many disadvantages: flux penalties, increase of fuel consumption, cost and delay to obtain a new license etc. But to fulfill the non-proliferation programme, and to simplify the future fuel supply, the HFR renewed in 1998 studies on conversion possibilities. To minimize the conversion costs, these studies were made with a progressive conversion that avoids the need of one new core and permits to begin the conversion with a replacement of 5 elements at each cycle. Hence the conversion can be made in 7 cycles, without special elements and with a normal bum-up for each element. To avoid an increase of fuel consumption, an increase of the fuel cycle length from 24.7 to 28.3 days was also considered. This point allows reducing the number of annual cycles from 1 to 10 and enables in one cycle to have the possibility of four successive irradiations for Molybdenum production (7 days) in one irradiation position. A working plan for fuel licensing has been sent to the safety authorities and is presented in the paper. (author)

  16. Engineering work plan for implementing the Process Condensate Recycle Project at the 242-A evaporator

    International Nuclear Information System (INIS)

    Haring, D.S.

    1995-01-01

    The 242-A Evaporator facility is used to reduce the volume of waste stored in the Hanford double shell tanks. This facility uses filtered raw water for cooling, de-entrainment pad sprays, pump seal water, and chemical tank make-up. Some of these uses result in the introduction of filtered raw water into the process, thus increasing the volume of waste requiring evaporation and subsequent treatment by the 200 East Effluent Treatment Facility. The pump seal water and the de-entrainment pad spray systems were identified as candidates for a waste minimization upgrade. This work plan describes the activities associated with the design, installation, testing and initial operation of the process condensate recycle system. Implementation of the process condensate recycle system will permit the use of process condensate in place of raw water for the de-entrainment pad sprays and pump seals. This will reduce the amount of low-level liquid waste and generated during facility operation through source reduction and recycling

  17. Integration of Nevada Test Site (NTS) Work Control Programs and Incorporating Integrated Safety Management (ISM) into Activity Level Work Planning and Control

    International Nuclear Information System (INIS)

    Kinney, Mike; Breen, Kevin

    2008-01-01

    This session will examine a method developed by Federal and Contractor personnel at the Nevada Site Office (NSO) to improve the planning and execution of work activities utilizing an Activity Level Work Control process in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations. The process was initially developed during Fiscal Year (FY) 2007, and implementation is commencing during the fourth quarter of FY 2008. This process will significantly enhance the flexibility and the appropriate rigor in the performance of work activities

  18. Measurement based scenario analysis of short-range distribution system planning

    DEFF Research Database (Denmark)

    Chen, Peiyuan; Bak-Jensen, Birgitte; Chen, Zhe

    2009-01-01

    This paper focuses on short-range distribution system planning using a probabilistic approach. Empirical probabilistic distributions of load demand and distributed generations are derived from the historical measurement data and incorporated into the system planning. Simulations with various...... feasible scenarios are performed based on a local distribution system at Støvring in Denmark. Simulation results provide more accurate and insightful information for the decision-maker when using the probabilistic analysis than using the worst-case analysis, so that a better planning can be achieved....

  19. Measuring the quality of Patients’ goals and action plans: development and validation of a novel tool

    Directory of Open Access Journals (Sweden)

    Teal Cayla R

    2012-12-01

    Full Text Available Abstract Background The purpose of this study is to develop and test reliability, validity, and utility of the Goal-Setting Evaluation Tool for Diabetes (GET-D. The effectiveness of diabetes self-management is predicated on goal-setting and action planning strategies. Evaluation of self-management interventions is hampered by the absence of tools to assess quality of goals and action plans. To address this gap, we developed the GET-D, a criteria-based, observer rating scale that measures the quality of patients’ diabetes goals and action plans. Methods We conducted 3-stage development of GET-D, including identification of criteria for observer ratings of goals and action plans, rater training and pilot testing; and then performed psychometric testing of the GET-D. Results Trained raters could effectively rate the quality of patient-generated goals and action plans using the GET-D. Ratings performed by trained evaluators demonstrated good raw agreement (94.4% and inter-rater reliability (Kappa = 0.66. Scores on the GET-D correlated well with measures theoretically associated with goal-setting, including patient activation (r=.252, P Conclusions The GET-D can reliably and validly rate the quality of goals and action plans. It holds promise as a measure of intervention fidelity for clinical interventions that promote diabetes self-management behaviors to improve clinical outcomes. Trial registration Clinicaltrials.gov Identifier: NCT00481286

  20. 75 FR 51831 - Request for Measures of Health Plan Efforts To Address Health Plan Members' Health Literacy Needs

    Science.gov (United States)

    2010-08-23

    ... and health plans. The results of the planned survey may become an important source of information for... services and nurse advice lines, the quality and accessibility of health plan information on coverage...

  1. A framework for operationalization of strategic plans and metrics for corporate performance measurement in transportation asset management

    Science.gov (United States)

    Mteri, Hassan H.

    literature, assumptions and characteristics that make the Balanced Scorecards and strategy maps work effectively in the private sector were identified. Gaps in implementation of strategic plans and the use of Balanced Scorecard in the public sector were derived. Although Balanced Scorecards have previously been used to a limited extent in transportation agencies, the use of combined Balanced Scorecards and strategy maps with a much broader utility of translating strategic plans into tactical and operational activities for Transportation Asset Management is yet to be established. The thesis presents a framework to operationalize strategic plans through the combined application of Balanced Scorecards and strategy maps. The proposed framework aligns overarching objectives in all organizational levels: corporate, tactical, and operation, in which detail information is delegated from top level to lower levels. Furthermore, the thesis presents a proposed framework for developing and using effective corporate performance measures. The framework for performance measures provides a key tool for tracking progress and ensuring overall operationalization of strategic plans in transportation agencies. The thesis presents a methodology to assess existing performance measures so that agencies can reduce the number of measures, to be more effective and manageable. It was found that among other good characteristics, corporate performance measures must be tied to agency's goals and objectives and must be sensitive or responsive to program delivery activities and to the impacts of decisions about resource allocation.

  2. Working Around Cosmic Variance: Remote Quadrupole Measurements of the CMB

    Science.gov (United States)

    Adil, Arsalan; Bunn, Emory

    2018-01-01

    Anisotropies in the CMB maps continue to revolutionize our understanding of the Cosmos. However, the statistical interpretation of these anisotropies is tainted with a posteriori statistics. The problem is particularly emphasized for lower order multipoles, i.e. in the cosmic variance regime of the power spectrum. Naturally, the solution lies in acquiring a new data set – a rather difficult task given the sample size of the Universe.The CMB temperature, in theory, depends on: the direction of photon propagation, the time at which the photons are observed, and the observer’s location in space. In existing CMB data, only the first parameter varies. However, as first pointed out by Kamionkowski and Loeb, a solution lies in making the so-called “Remote Quadrupole Measurements” by analyzing the secondary polarization produced by incoming CMB photons via the Sunyaev-Zel’dovich (SZ) effect. These observations allow us to measure the projected CMB quadrupole at the location and look-back time of a galaxy cluster.At low redshifts, the remote quadrupole is strongly correlated to the CMB anisotropy from our last scattering surface. We provide here a formalism for computing the covariance and relation matrices for both the two-point correlation function on the last scattering surface of a galaxy cluster and the cross correlation of the remote quadrupole with the local CMB. We then calculate these matrices based on a fiducial model and a non-standard model that suppresses power at large angles for ~104 clusters up to z=2. We anticipate to make a priori predictions of the differences between our expectations for the standard and non-standard models. Such an analysis is timely in the wake of the CMB S4 era which will provide us with an extensive SZ cluster catalogue.

  3. Dose discrepancy between planning system estimation and measurement in spine stereotactic body radiation therapy: A case report

    International Nuclear Information System (INIS)

    Arumugam, Sankar; Xing, Aitang; Vial Philip; Berry Megan; Ochoa, Cesar; Beeksma, Bradley

    2017-01-01

    Stereotactic body radiation therapy (SBRT) to treat spinal metastases has shown excellent clinical outcomes for local control. High dose gradients wrapping around spinal cord make this treatment technically challenging. In this work, we present a spine SBRT case where a dosimetric error was identified during pre-treatment dosimetric quality assurance (QA). A patient with metastasis in T7 vertebral body consented to undergo SBRT. A dual arc volumetric modulated arc therapy plan was generated on the Pinnacle treatment planning system (TPS) with a 6 MV Elekta machine using gantry control point spacing of 4°. Standard pre-treatment QA measurements were performed, including ArcCHECK, ion chamber in CTV and spinal cord (SC) region and film measurements in multiple planes. While the dose measured at CTV region showed good agreement with TPS, the dose measured to the SC was significantly higher than reported by TPS in the original and repeat plans. Acceptable agreement was only achieved when the gantry control point spacing was reduced to 3°. A potentially harmful dose error was identified by pre-treatment QA. TPS parameter settings used safely in conventional treatments should be re-assessed for complex treatments.

  4. Technical Work Plan for: Near Field Environment: Engineered System: Radionuclide Transport Abstraction Model Report

    Energy Technology Data Exchange (ETDEWEB)

    J.D. Schreiber

    2006-12-08

    This technical work plan (TWP) describes work activities to be performed by the Near-Field Environment Team. The objective of the work scope covered by this TWP is to generate Revision 03 of EBS Radionuclide Transport Abstraction, referred to herein as the radionuclide transport abstraction (RTA) report. The RTA report is being revised primarily to address condition reports (CRs), to address issues identified by the Independent Validation Review Team (IVRT), to address the potential impact of transport, aging, and disposal (TAD) canister design on transport models, and to ensure integration with other models that are closely associated with the RTA report and being developed or revised in other analysis/model reports in response to IVRT comments. The RTA report will be developed in accordance with the most current version of LP-SIII.10Q-BSC and will reflect current administrative procedures (LP-3.15Q-BSC, ''Managing Technical Product Inputs''; LP-SIII.2Q-BSC, ''Qualification of Unqualified Data''; etc.), and will develop related Document Input Reference System (DIRS) reports and data qualifications as applicable in accordance with prevailing procedures. The RTA report consists of three models: the engineered barrier system (EBS) flow model, the EBS transport model, and the EBS-unsaturated zone (UZ) interface model. The flux-splitting submodel in the EBS flow model will change, so the EBS flow model will be validated again. The EBS transport model and validation of the model will be substantially revised in Revision 03 of the RTA report, which is the main subject of this TWP. The EBS-UZ interface model may be changed in Revision 03 of the RTA report due to changes in the conceptualization of the UZ transport abstraction model (a particle tracker transport model based on the discrete fracture transfer function will be used instead of the dual-continuum transport model previously used). Validation of the EBS-UZ interface model

  5. Mars 2001 Lander Mission: Measurement Synergy Through Coordinated Operations Planning And Implementation

    Science.gov (United States)

    Arvidson, R.; Bell, J. F., III; Kaplan, D.; Marshall, J.; Mishkin, A.; Saunders, S.; Smith, P.; Squyres, S.

    1999-09-01

    The 2001 Mars Surveyor Program Mission includes an orbiter with a gamma ray spectrometer and a multispectral thermal imager, and a lander with an extensive set of instrumentation, a robotic arm, and the Marie Curie Rover. The Mars 2001 Science Operations Working Group (SOWG) is a subgroup of the Project Science Group that has been formed to provide coordinated planning and implementation of scientific observations, particularly for the landed portion of the mission. The SOWG will be responsible for delivery of a science plan and, during operations, generation and delivery of conflict-free sequences. This group will also develop an archive plan that is compliant with Planetary Data System (PDS) standards, and will oversee generation, validation, and delivery of integrated archives to the PDS. In this report we cover one element of the SOWG planning activities, the development of a plan that maximizes the scientific return from lander-based observations by treating the instrument packages as an integrated payload. Scientific objectives for the lander mission have been defined. They include observations focused on determining the bedrock geology of the site through analyses of rocks and also local materials found in the soils, and the surficial geology of the site, including windblown deposits and the nature and history of formation of indurated sediments such as duricrust. Of particular interest is the identification and quantification of processes related to early warm, wet conditions and the presence of hydrologic or hydrothermal cycles. Determining the nature and origin of duricrust and associated salts is -very important in this regard. Specifically, did these deposits form in the vadose zone as pore water evaporated from soils or did they form by other processes, such as deposition of volcanic aerosols? Basic information needed to address these questions includes the morphology, topography, and geologic context of landforms and materials exposed at the site

  6. Mars 2001 Lander Mission: Measurement Synergy Through Coordinated Operations Planning And Implementation

    Science.gov (United States)

    Arvidson, R.; Bell, J. F., III; Kaplan, D.; Marshall, J.; Mishkin, A.; Saunders, S.; Smith, P.; Squyres, S.

    1999-01-01

    The 2001 Mars Surveyor Program Mission includes an orbiter with a gamma ray spectrometer and a multispectral thermal imager, and a lander with an extensive set of instrumentation, a robotic arm, and the Marie Curie Rover. The Mars 2001 Science Operations Working Group (SOWG) is a subgroup of the Project Science Group that has been formed to provide coordinated planning and implementation of scientific observations, particularly for the landed portion of the mission. The SOWG will be responsible for delivery of a science plan and, during operations, generation and delivery of conflict-free sequences. This group will also develop an archive plan that is compliant with Planetary Data System (PDS) standards, and will oversee generation, validation, and delivery of integrated archives to the PDS. In this report we cover one element of the SOWG planning activities, the development of a plan that maximizes the scientific return from lander-based observations by treating the instrument packages as an integrated payload. Scientific objectives for the lander mission have been defined. They include observations focused on determining the bedrock geology of the site through analyses of rocks and also local materials found in the soils, and the surficial geology of the site, including windblown deposits and the nature and history of formation of indurated sediments such as duricrust. Of particular interest is the identification and quantification of processes related to early warm, wet conditions and the presence of hydrologic or hydrothermal cycles. Determining the nature and origin of duricrust and associated salts is -very important in this regard. Specifically, did these deposits form in the vadose zone as pore water evaporated from soils or did they form by other processes, such as deposition of volcanic aerosols? Basic information needed to address these questions includes the morphology, topography, and geologic context of landforms and materials exposed at the site

  7. Do we all agree on how to measure work engagement? Factorial validity of Utrecht Work Engagement Scale as a standard measurement tool – A literature review

    OpenAIRE

    Konrad Kulikowski

    2017-01-01

    Work engagement as a predictor of health is an emerging concept in occupational science and the Utrecht Work Engagement Scale (UWES) is the most popular work engagement measurement tool. However, despite its popularity, the UWES is not free from controversy concerning its factorial validity. In this paper, 21 research studies on both UWES-9 and UWES-17 factorial validity within the confirmatory factor analysis (CFA) approach have been reviewed in order to answer the question as to which of th...

  8. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2; TOPICAL

    International Nuclear Information System (INIS)

    GRYGIEL, M.L.

    1998-01-01

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system

  9. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  10. Present status of ambient dose equivalent rate and radioactive substance concentration measurements in working environment. (3) Measuring instruments for ionizing radiation in working environments

    International Nuclear Information System (INIS)

    Matsubara, Shohei

    2006-01-01

    In order to measure the airborne radioactive substance concentration in working environments, some kinds of sampler such as dust sampler and iodine sampler, measuring instruments (alpha and beta spectrometer, and liquid scintillation counter), monitor (dust-, iodine- and gas-monitor), survey meter for measuring gamma ray dose rate are stated. The measurement method of α, β and γ-ray nuclides and ambient dose-equivalent at 10 mm was explained. Some examples of the list of dust sampler, filter, tritium sampler, dust monitor, iodine monitor, gas monitor, and survey meter on the market are shown. There are so many kinds of measuring instruments for ionizing radiation in working environment that the best instrument for measurement should be selected. The environment conditions such as sample form, temperature and humidity have to be considered in order to evaluate the measurement values. (S.Y.)

  11. Engineering Work Plan for Development of Sludge Pickup Adapter for Fuel Cleanliness Inspections

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    The plan for developing an adapter to suction up sludge into a calibrated tube for fuel cleanliness inspection activities is described. A primary assessment of fuel cleanliness to be performed after processing through the Primary Cleaning Machine is whether the volume of any remaining canister sludge in or on a fuel assembly exceeds the allowable 14 cm 3 limit. It is anticipated that a general visual inspection of the sludge inventory after fuel assembly separation will usually suffice in making this assessment, but occasions may arise where there is some question as to whether or not the observed quantity of sludge exceeds this limit. Therefore a quantitative method of collecting and measuring the sludge volume is needed for these borderline situations. It is proposed to develop an adapter that fits on the end of the secondary cleaning station vacuum wand that will suction the material from the sludge collection tray into a chamber marked with the limiting volume to permit a direct go/no-go assessment of the sludge quantity

  12. Indoor radio measurement and planning for UMTS/HSDPA with antennas

    Science.gov (United States)

    Eheduru, Marcellinus

    Over the last decade, mobile communication networks have evolved tremendously with a key focus on providing high speed data services in addition to voice. The third generation of mobile networks in the form of Universal Mobile Telecommunications System (UMTS) is already offering revolutionary mobile broadband experience to its users by deploying High Speed Downlink Packet Access (HSDPA) as its packet-data technology. With data speeds up to 14.4 Mbps and ubiquitous mobility, HSDPA is anticipated to become a preferred broadband access medium for end-users via mobile phones, laptops etc. While majority of these end-users are located indoors most of the time, approximately 70-80% of the HSDPA traffic is estimated to originate from inside buildings. Thus for network operators, indoor coverage has become a necessity for technical and business reasons. Macro-cellular (outdoor) to indoor coverage is a natural inexpensive way of providing network coverage inside the buildings. However, it does not guarantee sufficient link quality required for optimal HSDPA operation. On the contrary, deploying a dedicated indoor system may be far too expensive from an operator's point of view. In this thesis, the concept is laid for the understanding of indoor radio wave propagation in a campus building environment which could be used to plan and improve outdoor-to-indoor UMTS/HSDPA radio propagation performance. It will be shown that indoor range performance depends not only on the transmit power of an indoor antenna, but also on the product's response to multipath and obstructions in the environment along the radio propagation path. An extensive measurement campaign will be executed in different indoor environments analogous to easy, medium and hard radio conditions. The effects of walls, ceilings, doors and other obstacles on measurement results would be observed. Chapter one gives a brief introduction to the evolution of UMTS and HSDPA. It goes on to talk about radio wave propagation

  13. Using measurable dosimetric quantities to characterize the inter-structural tradeoff in inverse planning

    Science.gov (United States)

    Liu, Hongcheng; Dong, Peng; Xing, Lei

    2017-08-01

    Traditional inverse planning relies on the use of weighting factors to balance the conflicting requirements of different structures. Manual trial-and-error determination of weighting factors has long been recognized as a time-consuming part of treatment planning. The purpose of this work is to develop an inverse planning framework that parameterizes the dosimetric tradeoff among the structures with physically meaningful quantities to simplify the search for clinically sensible plans. In this formalism, instead of using weighting factors, the permissible variation range of the prescription dose or dose volume histogram (DVH) of the involved structures are used to characterize the ‘importance’ of the structures. The inverse planning is then formulated into a convex feasibility problem, called the dosimetric variation-controlled model (DVCM), whose goal is to generate plans with dosimetric or DVH variations of the structures consistent with the pre-specified values. For simplicity, the dosimetric variation range for a structure is extracted from a library of previous cases which possess similar anatomy and prescription. A two-phase procedure (TPP) is designed to solve the model. The first phase identifies a physically feasible plan to satisfy the prescribed dosimetric variation, and the second phase automatically improves the plan in case there is room for further improvement. The proposed technique is applied to plan two prostate cases and two head-and-neck cases and the results are compared with those obtained using a conventional CVaR approach and with a moment-based optimization scheme. Our results show that the strategy is able to generate clinically sensible plans with little trial and error. In all cases, the TPP generates a very competitive plan as compared to those obtained using the alternative approaches. Particularly, in the planning of one of the head-and-neck cases, the TPP leads to a non-trivial improvement in the resultant dose distribution

  14. 75 FR 57782 - Registration Review; Pesticide Dockets Opened for Review and Comment; Amended Work Plan for...

    Science.gov (United States)

    2010-09-22

    ... announcing that the docket for formetanate hydrochloride, which was planned for September 2010, has been... hydrochloride, which was planned for September 2010, has been postponed until December 2010. Table 1... (7417) EPA-HQ-OPP-2010-0214 Carissa Cyran, (703) 347-8781, [email protected] Sodium cyanide (8002...

  15. Employee Ownership and Perceptions of Work: The Effect of an Employee Stock Ownership Plan.

    Science.gov (United States)

    Tucker, James; And Others

    1989-01-01

    A small company was studied before and after introduction of an employee stock ownership plan. Employees' commitment to the organization and job satisfaction were higher after plan implementation, while perceived worker influence levels did not change. Findings suggest that ownership changes employees' attitudes without changing employees'…

  16. How to measure working memory capacity in the change detection paradigm

    NARCIS (Netherlands)

    Rouder, Jeffrey N.; Morey, Richard D.; Morey, Candice C.; Cowan, Nelson

    Although the measurement of working memory capacity is crucial to understanding working memory and its interaction with other cognitive faculties, there are inconsistencies in the literature on how to measure capacity. We address the measurement in the change detection paradigm, popularized by Luck

  17. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents

  18. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  19. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-14

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

  20. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  1. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  2. Report of the working group on precision measurements. - Measurement of the W boson mass and width

    International Nuclear Information System (INIS)

    Brock, R.; Erler, J.; Kim, Y.-K.; Marciano, W.; Ashmanskas, W.; Baur, U.; Ellison, J.; Lancaster, M.; Nodulman, L.; Rha, J.; Waters, D.; Womersley, J.

    2000-01-01

    We discuss the prospects for measuring the W mass and width in Run II. The basic techniques used to measure M W are described and the statistical, theoretical and detector-related uncertainties are discussed in detail. Alternative methods of measuring the W mass at the Tevatron and the prospects for M W measurements at other colliders are also described

  3. Planning sentences while doing other things at the same time: effects of concurrent verbal and visuospatial working memory load.

    Science.gov (United States)

    Klaus, Jana; Mädebach, Andreas; Oppermann, Frank; Jescheniak, Jörg D

    2017-04-01

    This study investigated to what extent advance planning during sentence production is affected by a concurrent cognitive load. In two picture-word interference experiments in which participants produced subject-verb-object sentences while ignoring auditory distractor words, we assessed advance planning at a phonological (lexeme) and at an abstract-lexical (lemma) level under visuospatial or verbal working memory (WM) load. At the phonological level, subject and object nouns were found to be activated before speech onset with concurrent visuospatial WM load, but only subject nouns were found to be activated with concurrent verbal WM load, indicating a reduced planning scope as a function of type of WM load (Experiment 1). By contrast, at the abstract-lexical level, subject and object nouns were found to be activated regardless of type of concurrent load (Experiment 2). In both experiments, sentence planning had a more detrimental effect on concurrent verbal WM task performance than on concurrent visuospatial WM task performance. Overall, our results suggest that advance planning at the phonological level is more affected by a concurrently performed verbal WM task than advance planning at the abstract-lexical level. Also, they indicate an overlap of resources allocated to phonological planning in speech production and verbal WM.

  4. Working Memory Training Does Not Improve Performance on Measures of Intelligence or Other Measures of “Far Transfer”

    Science.gov (United States)

    Melby-Lervåg, Monica; Redick, Thomas S.; Hulme, Charles

    2016-01-01

    It has been claimed that working memory training programs produce diverse beneficial effects. This article presents a meta-analysis of working memory training studies (with a pretest-posttest design and a control group) that have examined transfer to other measures (nonverbal ability, verbal ability, word decoding, reading comprehension, or arithmetic; 87 publications with 145 experimental comparisons). Immediately following training there were reliable improvements on measures of intermediate transfer (verbal and visuospatial working memory). For measures of far transfer (nonverbal ability, verbal ability, word decoding, reading comprehension, arithmetic) there was no convincing evidence of any reliable improvements when working memory training was compared with a treated control condition. Furthermore, mediation analyses indicated that across studies, the degree of improvement on working memory measures was not related to the magnitude of far-transfer effects found. Finally, analysis of publication bias shows that there is no evidential value from the studies of working memory training using treated controls. The authors conclude that working memory training programs appear to produce short-term, specific training effects that do not generalize to measures of “real-world” cognitive skills. These results seriously question the practical and theoretical importance of current computerized working memory programs as methods of training working memory skills. PMID:27474138

  5. Do work-place initiated measures reduce sickness absence? Preventive measures and sickness absence among older workers in Norway.

    Science.gov (United States)

    Midtsundstad, Tove I; Nielsen, Roy A

    2014-03-01

    The article examines whether preventive measures and work adjustments at the establishment level affects sickness absence among workers aged 50 years and older. We combine survey data from a representative sample of 713 Norwegian companies, mapping the prevalence of preventive health measures in the work place in 2005, with register data on sickness absence and demographic variables for workers aged 50 years or older in 2001 and 2007. By means of a difference-in-differences approach, we compare changes and differences in the likelihood of sickness absence among the sample group, with and without the various measures/ instruments in 2005 respectively. In general, work-place preventive measures at the establishment level have not contributed to reducing the probability for sickness absence among workers aged 50 years and older. However, analyses comparing differences between industries find that the work-place measures have had a positive effect on public administration employees. Whether work-place preventive initiatives influence levels of sickness absence seems to be contingent on sector and industry. Therefore, work-place measures may be more effective in the public administration sector where most employees have office jobs compared to sectors such as manufacturing, construction and transportation, where many employees have manual work and more physical demanding jobs. Work-place initiatives thus seem to have less effect on preventing sickness absence in sectors dominated by manual labour.

  6. Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing

    OpenAIRE

    Kimms, Alf

    1996-01-01

    This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.

  7. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Science.gov (United States)

    2010-01-01

    ... financial ratings, and participation in reliability council, power pool, regional transmission group, power... analysis and modeling of the borrower's electric system loads as provided for in the load forecast work plan. (5) A narrative discussing the borrower's past, existing, and forecast of future electric system...

  8. SUPERFUND TREATABILITY CLEARINGHOUSE: WORK PLAN FOR BIODEGRADATION OF POLY-CHLORINATED BIPHENYLS (PCBS) AT A SUPERFUND SITE

    Science.gov (United States)

    This document is composed of a work plan and additional technical information which demonstrates the qualifications of Detox Industries, Inc. to conduct remediation of a PCB contaminated sludge at General Motors (GM) plant in New York. Provided are the results of a field demons...

  9. The Relationship between Working Memory Capacity and L2 Oral Performance under Task-Based Careful Online Planning Condition

    Science.gov (United States)

    Ahmadian, Mohammad Javad

    2012-01-01

    The study reported in this article aimed to investigate the way working memory capacity (WMC) interacts with careful online planning--a task-based implementation variable--to affect second language (L2) speech production. This issue is important to teachers, because it delves into one of the possible task-based implementation variables and thus…

  10. Lessons from disaster: Creating a business continuity plan that really works.

    Science.gov (United States)

    Hatton, Tracy; Grimshaw, Eleanor; Vargo, John; Seville, Erica

    Business Continuity Planning (BCP) is well established as a key plank in an organisation's risk management process. But how effective is BCP when disaster strikes? This paper examines the experiences of organisations following the 2010-11 Canterbury, New Zealand earthquakes. The study finds that BCP was helpful for all organisations interviewed but more attention is needed on the management of societal and personal impacts; development of employee resilience, identification of effective crisis leaders; right-sizing plans and planning to seize opportunities post-disaster.

  11. Health problems due to long working hours in Japan: working hours, workers' compensation (Karoshi), and preventive measures.

    Science.gov (United States)

    Iwasaki, Kenji; Takahashi, Masaya; Nakata, Akinori

    2006-10-01

    Late in the 1970s, serious social concern over health problems due to long working hours has arisen in Japan. This report briefly summarizes the Japanese circumstances about long working hours and what the Government has achieved so far. The national statistics show that more than 6 million people worked for 60 h or more per week during years 2000 and 2004. Approximately three hundred cases of brain and heart diseases were recognized as labour accidents resulting from overwork (Karoshi) by the Ministry of Health, Labour and Welfare (MHLW) between 2002 and 2005. Consequently, the MHLW has been working to establish a more appropriate compensation system for Karoshi, as well as preventive measures for overwork related health problems. In 2001, the MHLW set the standards for clearly recognizing Karoshi in association with the amount of overtime working hours. These standards were based on the results of a literature review and medical examinations indicating a relationship between overwork and brain and heart diseases. In 2002, the MHLW launched the program for the prevention of health impairment due to overwork, and in 2005 the health guidance through an interview by a doctor for overworked workers has been enacted as law. Long working hours are controversial issues because of conflicts between health, safety, work-life balance, and productivity. It is obvious that we need to continue research regarding the impact on worker health and the management of long working hours.

  12. Comprehensibility, manageability and meaningfulness at work: Construct validity of a scale measuring work-related sense of coherence

    Directory of Open Access Journals (Sweden)

    Katharina Vogt

    2013-09-01

    Research purpose: The aim of the present study was to investigate the factorial invariance and the construct validity of a scale that measures Work-SoC. Motivation for the study: It might be useful to specifically apply the concept of sense of coherence to the work context. Research design, approach and method: Statistical analysis was performed on crosssectional (n = 3412 and longitudinal (n = 1286 questionnaire data collected in eight medium to large Swiss companies from diverse economic sectors (four industrialproduction companies, one food-processing company, one public-administration service and two hospitals. The dataset therefore covers a broad range of different occupational groups. Main findings: Multiple-group analyses indicated that the scale’s factor structure remains invariant across different employee groups and across time. High values in job resources were related to high values in Work-SoC whereas high values in job demands were related to low values in Work-SoC. Furthermore, Work-SoC acted as a partial mediator between job resources and work engagement. Practical/managerial implications: It can be concluded that Work-SoC might serve as a practical screening instrument for assessing an employee’s perception of the potential health-promoting qualities of his or her current work situation. Contribution/value-add: The study advances both the salutogenic theory and the field of positive occupational health psychology by redefining sense of coherence as an interactional and context-specific construct that is useful for intervention research.

  13. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  14. The Total Work Measured During a High Intensity Isokinetic Fatigue Test Is Associated With Anaerobic Work Capacity

    Directory of Open Access Journals (Sweden)

    Laurent Bosquet, Kenan Gouadec, Nicolas Berryman, Cyril Duclos, Vincent Gremeaux, Jean Louis Croisier

    2016-03-01

    Full Text Available The purpose of the study was to determine whether total work measured during a high intensity isokinetic fatigue test (TWFAT could be considered as a valid measure of anaerobic work capacity (AWC, such as determined by total work measured during a Wingate Anaerobic Test (TWWAnT. Twenty well-trained cyclists performed 2 randomly ordered sessions involving a high intensity isokinetic fatigue test consisting in 30 reciprocal maximal concentric contractions of knee flexors and extensors at 180°·s-1, and a Wingate Anaerobic Test. We found that TWFAT of knee extensors was largely lower than TWWAnT (4151 ± 691 vs 22313 ± 2901 J, respectively, p < 0.05, Hedge’s g = 4.27. Both measures were highly associated (r = 0.83, and the 95% limits of agreement (LoA represented 24.5% of TWWAnT. TWFAT of knee flexors (2151 ± 540 J was largely lower than TWWAnT (p < 0.05, g = 9.52. By contrast, both measures were not associated (r = 0.09, and the 95% LoA represented 31.1% of TWWAnT. Combining TWFAT of knee flexors and knee extensors into a single measure (6302 ± 818 J did not changed neither improved these observations. We still found a large difference with TWWAnT (p < 0.05, g = 5.26, a moderate association (r = 0.65 and 95% LoA representing 25.5% of TWWAnT. We concluded that TWFAT of knee extensors could be considered as a valid measure of AWC, since both measure were highly associated. However, the mean difference between both measures and their 95% LoA were too large to warrant interchangeability.

  15. Communication and Monitoring- Necessary Processes for Managing and Measuring Conflicts, Absenteeism, Fluctuation and Work Accidents

    Directory of Open Access Journals (Sweden)

    Tănăsescu Dorina Antoneta

    2015-06-01

    Full Text Available In any organizations, between employees, between employees and management are inevitabily appearing conflicts, absenteeism, personnel fluctuation and work accidents (CAFA factors. To diminish the impact of these social dysfunctions, organizations must pay attention to the effective managing and monitoring using performance indicators and an effective communication process and implementing a good plan of evaluation.

  16. Working together on automated vehicle guidance AVG : preliminary business plan, abridged version.

    NARCIS (Netherlands)

    Awareness (ed.)

    1998-01-01

    This plan describes the questions which will have to be answered in the short term, and the action which need to be taken in a phased and structured manner to gain insight into the potential of automated vehicle guidance (AVG).

  17. Theme II Joint Work Plan -2017 Collaboration and Knowledge Sharing on Large-scale Demonstration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Xiaoliang [World Resources Inst. (WRI), Washington, DC (United States); Stauffer, Philip H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-25

    This effort is designed to expedite learnings from existing and planned large demonstration projects and their associated research through effective knowledge sharing among participants in the US and China.

  18. Speech production and working memory: The influence of cognitive load on sentence planning

    OpenAIRE

    Klaus, Jana

    2015-01-01

    For the last four decades, psycholinguistic research has dealt with the question to what extent elements of simple sentences like “The monk read the book” are planned ahead both on the abstract-lexical and phonological processing level. While a number of studies have shown that all up to the final element can be activated on these two levels, empirical evidence on the flexibility of the respective planning scopes is inconsistent, and a systematic delineation of the influence of different fo...

  19. The association between psychosocial work environment, attitudes towards older workers (ageism) and planned retirement

    DEFF Research Database (Denmark)

    Thorsen, Sannie; Rugulies, Reiner; Løngaard, Katja

    2012-01-01

    The aim of this study was to examine the association between psychosocial factors (in particular ageism) at the workplace and older workers' retirement plans, while taking health and workability of the employee into account.......The aim of this study was to examine the association between psychosocial factors (in particular ageism) at the workplace and older workers' retirement plans, while taking health and workability of the employee into account....

  20. Front-end Electronics for Unattended Measurement (FEUM). Prototype Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, Ryan C.; Morris, Scott J.; Smith, Leon E.; Keller, Daniel T.

    2015-09-16

    The IAEA has requested that PNNL perform an initial set of tests on front-end electronics for unattended measurement (FEUM) prototypes. The FEUM prototype test plan details the tests to be performed, the criteria for evaluation, and the procedures used to execute the tests.

  1. The Dutch Bicycle Master Plan and road safety : measures to be taken.

    NARCIS (Netherlands)

    Noordzij, P.C. & Blokpoel, A.

    1998-01-01

    The Bicycle Master Plan was launched in 1990 and concluded in 1996. To mark its conclusion, a study was carried out to assess developments in road safety for cyclists. An overview of future measures was also compiled. Since 1950, there have been three broad periods: (1) 1950-1975: an increase in the

  2. From Town Planning to Urban Design Work-The Dimensions to be Considered

    Directory of Open Access Journals (Sweden)

    Özcan Altaban

    2013-06-01

    organization and dynamic process of transformation and change. The different tissues often correspond with stages of the development of the city. In order to find a sense and direction within the complex phenomenon of the city, its elements can be analysed as part of three aspects. Physical structure of the city, functional structure of the city and the process that relates the physical form to its functions. Two types of physical structure appear as important. Thematic structure and non-thematic structure. Examples of thematic elements are the straight streets in a regular grid and the housing types in a residential area. Non- thematic structure consists of those elements and relations which tend to be different from typical ones and it makes references to larger areas than the tissue alone and relates and articulates different tissues together. Non-thematic elements can be classified in two types. Poles and tensions (or channels. Poles are the concentric points of the structure and agglomeration of poles will constitute a centre. Examples of poles are a church, a mosque or a public building. Tensions which are the linear dynamic links (channels such as boulevards or avenues. These elements can connect different part of the city. They also act as boundaries or limits of different areas that they support. Therefore, the non-thematic or primary structure that it is possible to define the unique and permanent structure of the city. In the last section of the paper an objective assessment or an evaluation is made about the critical and the anticipated issues on the change of scale from town planning to the lower level of urban design work. What are these steps which make somehow crucial expectations for the future of an urban area? 1. Firstly, it is the stage of production for a proper design which will direct the implementation process. 2. Secondly, the function of an urban project is to create an identity or a definition to the different urban sections will vary activities. 3

  3. Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-25

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation

  4. Item Construction Using Reflective, Formative, or Rasch Measurement Models: Implications for Group Work

    Science.gov (United States)

    Peterson, Christina Hamme; Gischlar, Karen L.; Peterson, N. Andrew

    2017-01-01

    Measures that accurately capture the phenomenon are critical to research and practice in group work. The vast majority of group-related measures were developed using the reflective measurement model rooted in classical test theory (CTT). Depending on the construct definition and the measure's purpose, the reflective model may not always be the…

  5. Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York

    International Nuclear Information System (INIS)

    1990-06-01

    This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs

  6. Solid waste programs Fiscal Year 1995 multi-year program plan/fiscal year work plan WBS 1.2.1

    International Nuclear Information System (INIS)

    McCarthy, M.M.

    1994-09-01

    The Hanford Mission Plan, Volume 1, Site Guidance identifies the need for the Solid Waste Program to treat, store, and dispose of a wide variety of solid material types consisting of multiple radioactive and hazardous waste classes. This includes future Hanford Site activities which will generate new wastes that must be handled as cleanup activities are completed. Solid wastes are typically categorized as transuranic waste, low level waste, low level mixed waste, and hazardous waste. To meet this need the Solid Waste Program has defined its mission as the following - receive, store, treat, decontaminate, and dispose of solid radioactive and nonradioactive dangerous wastes in a safe, cost effective and environmentally compliant manner. This workbook contains the program overview, program baselines and fiscal year work plan for the Solid Waste Program

  7. The career intentions, work-life balance and retirement plans of dental undergraduates at the University of Bristol.

    Science.gov (United States)

    Puryer, J; Patel, A

    2016-02-26

    Aim To investigate the career intentions, work-life balance and retirement plans of dental undergraduates at the University of Bristol in 2015.Method Cross-sectional survey of 210 clinical undergraduates using an anonymous self-report questionnaire.Results The response rate was 79%. The majority (81.7%) were 'satisfied' or 'extremely satisfied' with their choice of career. The majority (78.7%) felt men and women are equally likely to succeed in dentistry, although 42.9% felt men had an advantage over women with regards to career success. The majority (81.6%) intend on working within general practice, 11.3% within hospital dental services and 2.1% within community dental services. The majority (70.5%) intend to specialise within dentistry. Only 1.8% of participants intend on providing only National Health Service (NHS) dental treatment whereas the 86.5% would provide both NHS and private dental treatment. Fifteen years after qualifying, 52.2% plan to work part-time, and 37.8% intend on retiring at the age of 60 or below. The majority (86.6%) felt that childcare should be shared equally between both parents. Female students intend to take more time out of their career to concentrate on childcare and felt that having a child would affect their career more than males.Conclusion The anticipated career plans, work-life balance and retirement plans of undergraduates change over time, and further research should be carried out to monitor future career intentions of dental students in order to help with dental workforce planning.

  8. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  9. Adolescent Future Expectations of Work, Education, Family, and Community: Development of a New Measure

    Science.gov (United States)

    McWhirter, Ellen Hawley; McWhirter, Benedict T.

    2008-01-01

    The development and validation of a measure of adolescent future expectations associated with work, education, family, health, and church/community participation is presented. The 25-item measure was administered to a sample of 389 7th- to 12th-grade urban poor and working-class Chilean students. Results of an exploratory principal axis factor…

  10. Measuring Levels of Work in Academic Libraries: A Time Based Approach.

    Science.gov (United States)

    Gould, Donald P.

    1985-01-01

    Using Stratified Systems Theory, which focuses on the manager-subordinate relationship in the bureaucratic structure, a study was conducted to measure level of responsibility in work of 37 professional and nonprofessional positions in four academic library technical services departments. Three levels of work were measured in "time-spans of…

  11. Development and initial validation of a measure of work, family, and school conflict.

    Science.gov (United States)

    Olson, Kristine J

    2014-01-01

    This study reports the development and initial validation of a theoretically based measure of conflict between work, family, and college student roles. The measure was developed through the assessment of construct definitions and an assessment of measurement items by subject matter experts. Then, the measurement items were assessed with data from 500 college students who were engaged in work and family responsibilities. The results indicate that conflict between work, family, and school are effectively measured by 12 factors assessing the direction of conflict (e.g., work-to-school conflict, and school-to-work conflict) as well as the form of conflict (i.e., time, strain, and behavior based conflict). Sets of exploratory and confirmatory factor analyses demonstrated that the 12 factors of the new measure are distinct from the 6 factors of the Carlson, Kacmar, and Williams (2000) work-family conflict measure. Criterion validity of the measure was established through a series of regression analyses testing hypothesized relationships between antecedent and outcome variables with role conflict. Results indicate that role demand was a robust predictor of role conflict. To extend the literature, core self-evaluations and emotional stability were established as predictors of role conflict. Further, work, family, and school role satisfaction were significantly impacted with the presence of role conflict between work, family, and school. PsycINFO Database Record (c) 2014 APA, all rights reserved.

  12. Ultrasound as an Outcome Measure in Gout. A Validation Process by the OMERACT Ultrasound Working Group

    DEFF Research Database (Denmark)

    Terslev, Lene; Gutierrez, Marwin; Schmidt, Wolfgang A

    2015-01-01

    OBJECTIVE: To summarize the work performed by the Outcome Measures in Rheumatology (OMERACT) Ultrasound (US) Working Group on the validation of US as a potential outcome measure in gout. METHODS: Based on the lack of definitions, highlighted in a recent literature review on US as an outcome tool...

  13. The Measurement of Work Engagement with a Short Questionnaire: A Cross-National Study

    Science.gov (United States)

    Schaufeli, Wilmar B.; Bakker, Arnold B.; Salanova, Marisa

    2006-01-01

    This article reports on the development of a short questionnaire to measure work engagement--a positive work-related state of fulfillment that is characterized by vigor, dedication, and absorption. Data were collected in 10 different countries (N = 14,521), and results indicated that the original 17-item Utrecht Work Engagement Scale (UWES) can be…

  14. A Bayesian hierarchical model for the measurement of working memory capacity

    NARCIS (Netherlands)

    Morey, Richard D.

    Working memory is the memory system that allows for conscious storage and manipulation of information. The capacity of working memory is extremely limited. Measurements of this limit, and what affects it, are critical to understanding working memory. Cowan (2001) and Pashler (1988) suggested

  15. Measuring production loss due to health and work environment problems: construct validity and implications.

    Science.gov (United States)

    Karlsson, Malin Lohela; Bergström, Gunnar; Björklund, Christina; Hagberg, Jan; Jensen, Irene

    2013-12-01

    The aim was to validate two measures of production loss, health-related and work environment-related production loss, concerning their associations with health status and work environment factors. Validity was assessed by evaluating the construct validity. Health problems related and work environment-related problems (or factors) were included in separate analyses and evaluated regarding the significant difference in proportion of explained variation (R) of production loss. health problems production loss was not found to fulfill the criteria for convergent validity in this study; however, the measure of work environment-related production loss did fulfill the criteria that were set up. The measure of work environment-related production loss can be used to screen for production loss due to work environment problems as well as an outcome measure when evaluating the effect of organizational interventions.

  16. THE PROGRAM-TARGET PLANNING AND MANAGEMENT OF DEVELOPMENT OF MEASURING EQUIPMENT PARK

    Directory of Open Access Journals (Sweden)

    Marichev Pavel Aleksandrovich

    2018-02-01

    Full Text Available Subject: study of the Park of Measuring Equipment (PME that includes hundreds of thousands of standard samples, measuring instruments, control and measuring devices and other measuring mechanisms with different areas of application, levels of reliability, service life, levels of technical perfection and levels of technical condition. Research objectives: 1. Development of a complex of mathematical models to simulate the processes of development of PME, control indicators of PME performance as a whole, purposefully control the stages of life cycle of measuring equipment samples. 2. Development of the method which, with a sufficient degree of validity and objectivity, would solve the tasks of management of procurement and repairs both in preparation of proposals for preliminary long-term plan documents (LTPD and to ensure control over the implementation of adopted plans. Thus, the method being developed should be fairly simple to use, easily adjustable for solving problems of different dimensions, suitable for solving the optimal control problem for PME as a whole, for a part of PME, and also suitable for solving a generalized problem for certain “aggregated objects” such as the Metrology Centers. Materials and methods: the methods of mathematical simulation, methods of comparative analysis, simplex method for solving linear programming problem, methods of program-target planning were used. Results: an approach to the solution of problems of program-target planning based on solving a series of linear programming problems has been developed. The results have been presented of using the approach both for formulation of proposals into the preliminary LTPD and also for introducing revisions (amendments to annual plans, which are implemented in the framework of the state defense order. Conclusions: the described method and algorithms constitute an effective tool for solving practical problems of target-oriented management of PME performance

  17. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site

  18. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  19. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  20. Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    International Nuclear Information System (INIS)

    2010-01-01

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone No.3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  1. Walking the Torque: Proposed Work Plan for Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Electric motor-driven system is the largest single energy end use accounting for more than 40% of global electricity consumption. This paper sets out an ambitious but achievable target with the global work plan to improve the energy efficiency of electric motor-driven system by 10% to 15% based on the finding of working paper ''Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems (Waide et al., 2011)''. If governments commit to the proposed work plan immediately and maintain resourcing levels, this could be achieved by 2030 and it would be equivalent to reducing total global electricity use by around 5%. The proposed work plan of this paper is to align regulatory settings within a globally applicable scheme. The IEA believes this target can only be achieved through global co-operation leading to aligned national policy settings that countries can unlock the economies of scale that will result from using more energy efficient EMDS.

  2. Work and Family Plans among At-Risk Israeli Adolescents: A Mixed-Methods Study

    Science.gov (United States)

    Cinamon, Rachel Gali; Rich, Yisrael

    2014-01-01

    Quantitative methods were used to investigate attributions of importance to work and family roles and anticipated work--family conflict and facilitation among 353 at-risk Israeli male and female adolescents. Qualitative interviews conducted with 26 of the at-risk youth explored future work and family perceptions. Findings indicated that both sexes…

  3. SU-E-T-616: Plan Quality Assessment of Both Treatment Planning System Dose and Measurement-Based 3D Reconstructed Dose in the Patient

    International Nuclear Information System (INIS)

    Olch, A

    2015-01-01

    Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Eleven neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has

  4. SU-E-T-616: Plan Quality Assessment of Both Treatment Planning System Dose and Measurement-Based 3D Reconstructed Dose in the Patient

    Energy Technology Data Exchange (ETDEWEB)

    Olch, A [University of Southern California, Los Angeles, CA (United States)

    2015-06-15

    Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Eleven neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has

  5. 76 FR 35426 - Denali Commission Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2011-06-17

    ... developing access to construction trades through the enhancement of construction career pathways and the... providing an opportunity for a 30- day period of public review and written comment. During this time, the... Technology Program $2,400,000 Bulk Fuel/RPSU Planning, Design & $3,770,350 Construction. Renewable Energy...

  6. Developing strategic marketing plans that really work a toolkit for public libraries

    CERN Document Server

    Kendrick, Terry

    2006-01-01

    Many government and other reports stress the need to get public libraries back into the lives of potential users, and this requires significant marketing effort on the part of the libraries. This book de-mystifies the marketing planning process and sets it in the context of modern public library services.

  7. KPI-based activity planning for people working in flexible processes

    NARCIS (Netherlands)

    Eck, van M.L.; Sidorova, N.; Aalst, van der W.M.P.; Grabis, J.; Sandkuhl, K.

    2015-01-01

    Planning human activities within business processes often happens based on the same methods and algorithms as are used in the area of manufacturing systems. However, human resources are more complex than machines. Their performance depends on a number of factors, including stress, personal

  8. NPP accident scenario. Which emergency measures are planned in Switzerland?; Szenario KKW-Unfall. Welche Notfallschutzmassnahmen sind in der Schweiz geplant?

    Energy Technology Data Exchange (ETDEWEB)

    Flury, Christoph [Bundesamt fuer Bevoelkerungsschutz (BABS), Bern (Switzerland). Eidgenoessisches Departement fuer Verteidigung Bevoelkerungsschutz und Sport (VBS)

    2016-07-01

    As a consequence of the reactor accident in Fukushima the Swiss government has ordered an extensive analysis of emergency planning in case of a NPP accident Switzerland. A special working group has analyzed the possible improvements of Swiss emergency planning based on the experiences in Japan. Under the special direction of the Bundesamt fuer Bevoelkerungsschutz (BABS) the agreed improvements were integrated into the emergency concept. The reference scenarios have been re-assessed and the zone concept adapted. The emergency measures include shelter-type rooms (basement or window-less rooms), the preventive distribution of iodine pills, measures concerning agriculture, aquatic systems, preventive evacuation, traffic regulations, and delayed evacuation.

  9. Radon mitigation in private dwellings. Summary of measures under the National Action Plan against Cancer in Norway 1999-2003

    International Nuclear Information System (INIS)

    Aanestad, K.; Strand, T.; Hoegmo, T.; Skjennem, M.; Jensen, C. L.; Hoelsbrekken, S.

    2006-01-01

    The report summarizes the remedial measurements carried out under the National Action Plan against Cancer in Norway in the period 1999-2003.The cost effectiveness of the state subsidized remedial measures against radon is evaluated. Other measurements under the National Action Plan against Cancer have also been evaluated, such as measurements of radon in 38.000 dwellings in 158 municipalities, information measures, and actions to increase radon mitigation competence in the building construction industry and in the municipalities. (Author)

  10. Perceptions of breastfeeding and planned return to work or school among low-income pregnant women in the USA.

    Science.gov (United States)

    Rojjanasrirat, Wilaiporn; Sousa, Valmi D

    2010-07-01

    To describe the perceptions of breastfeeding in low-income pregnant women to understand their needs better as they plan to return to work or school. Maternal employment has a negative impact on breastfeeding duration. Yet there is insufficient research on challenges and facilitators regarding breastfeeding and employment issue among low-income women in the USA. Knowing the perceptions of breastfeeding among low-income pregnant women and their plan to return to work or school may have implications for nurses and midwives in providing quality care. Qualitative study using focus group interviews. The research setting consisted of three Women, Infants and Children clinics (WIC) in a midwestern city of the USA. Seventeen pregnant women (aged 19-35) participated in focus group interviews. Data were coded and analysed for themes and patterns using the QSR software - NVivo 6. Eleven participants were single. Ten women were primigravida, and seven were multipara. The following five themes were identified: (1) perceived benefits of breastfeeding; (2) general perceptions of breastfeeding; (3) maternal concerns; (4) having the right support; and (5) anticipated challenges of combining breastfeeding and work. Conclusions.  Low-income women anticipated substantial barriers for breastfeeding when they planned to combine breastfeeding and work or school. The results of this study have many implications for public health practice, research and policy. Educating employers and the public at large about the health and economic benefits derived from long-term breastfeeding could help promote breastfeeding awareness. Strategies supporting breastfeeding among low-income working women must be provided at multiple levels to help overcome the barriers they concern. Health care providers should help women gain confidence by minimising their uncertainties and fears about breastfeeding to prepare them to continue breastfeeding successfully after returning to work. © 2010 Blackwell

  11. Planning of sales on the example of the companyindustry works related to the construction of buildings and civil engineering

    OpenAIRE

    Marcin , Wojnowski

    2013-01-01

    The aim of the report is the proposal next year's sales for the analyzed company. In the report, in addition to the proposal is a brief description of the company and the chosen method of sales planning with the argument of choice. Another part of the report are presented with a description of the calculations and the whole is finished with a short summary of the work.

  12. DynCorp Tricities Services, Inc. Hanford fire department FY 1998 annual work plan

    International Nuclear Information System (INIS)

    Good, D.E.

    1997-01-01

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the U.S. Department of Energy operated Hanford site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. This fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This plan provides a program overview, program baselines, and schedule baseline

  13. Development of snow water equivalent survey methods using airborne gamma measurements. Research progress, January 1975--September 1975 and suggested directions for future work

    International Nuclear Information System (INIS)

    Fritzsche, A.; Jupiter, C.

    1975-01-01

    This is a summary of the progress made during the period March 1975 through September 1975 on EG and G's support of the National Oceanic and Atmospheric Administration for development of airborne techniques for measurement of the water equivalent of snow and soil moisture. The work included a series of snow and soil moisture surveys and development of a new detector and data acquisition system. The status of this work is summarized here together with a review of plans for the immediate future

  14. Spatial planning for fisheries in the Northern Adriatic: working toward viable and sustainable fishing

    DEFF Research Database (Denmark)

    Bastardie, Francois; Angelini, Silvia; Bolognini, Luca

    2017-01-01

    fishing vessel is impacted in the same way because some fishing communities experienced different economic opportunities, particularly when a 6-nautical mile buffer zone from the coast was implemented in the vicinity of important fishing grounds. Along this buffer zone, the four stocks were only slightly...... in a unified framework. We contribute to the development of effective science-based inputs to facilitate policy improvement and better governance while evaluating trade-offs in fisheries management and marine spatial planning...

  15. The Planning of a Small Pilot Plant for Development Work on Aqueous Reprocessing of Nuclear Fuels

    Energy Technology Data Exchange (ETDEWEB)

    Sjoeborg, T U; Haeffner, E; Hultgren, Aa

    1963-10-15

    A shielded volume (42 m{sup 3}) in the hot laboratory at Kjeller, Norway, has been used for the installation of a small pilot plant intended for studies on nuclear fuel reprocessing. During the first period of operation (1963) a plutonium separation method (the Silex process) developed at AB Atomenergi will be studied. This document is a description of the project during the stage of technical planning and chemical process development.

  16. Do we all agree on how to measure work engagement? Factorial validity of Utrecht Work Engagement Scale as a standard measurement tool - A literature review.

    Science.gov (United States)

    Kulikowski, Konrad

    2017-03-30

    Work engagement as a predictor of health is an emerging concept in occupational science and the Utrecht Work Engagement Scale (UWES) is the most popular work engagement measurement tool. However, despite its popularity, the UWES is not free from controversy concerning its factorial validity. In this paper, 21 research studies on both UWES-9 and UWES-17 factorial validity within the confirmatory factor analysis (CFA) approach have been reviewed in order to answer the question as to which of the UWES factorial structures displays greater validity. The originally proposed threefactor structure of the UWES has been recognized as superior in 6 studies. In further 6 studies, the UWES structure with 1 general factor has been found to be superior. In 8 studies, the authors have concluded that the one- and three-factor structures could be considered equivalent. One study has failed to confirm either the one- or three-factor structure of the UWES. These ambiguous results from studies focusing on the UWES factorial validity are puzzling because they not only indicate a lack of validity for the UWES as a measurement tool but might also challenge the whole concept of work engagement as a three-factor structure of dedication, vigor and absorption. Int J Occup Med Environ Health 2017;30(2):161-175. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  17. Challenges of Measuring Performance of the Sales and Operations Planning Process

    OpenAIRE

    Hulthén, Hana; Näslund, Dag; Norrman, Andreas

    2017-01-01

    The purpose of this study is to identify and structure challenges of measuring performance of the Sales and Operations Planning (S&OP) process. A multiple case study methodology was applied. Qualitative data was collected via 22 structured interviews with managers from six case companies in various industries. A process oriented framework was proposed by structuring the challenges based on two key areas of process performance (effectiveness and efficiency) and different maturity levels of the...

  18. Measuring the effectiveness of enterprise resource planning education on business process comprehension

    OpenAIRE

    Monk, Ellen Fischer

    2013-01-01

    This thesis was submitted for the degree of Doctor of Philosophy and was awarded by Brunel University Enterprise Resource Planning Systems (ERP) are very large and complex software packages that run every aspect of an organization. Increasingly, ERP systems are used in higher education to teach business processes, essential knowledge for students competing in today’s business environment. Past research attempting to measure learning business processes with ERP has been inconclusive and lac...

  19. Can Planning Time Compensate for Individual Differences in Working Memory Capacity?

    Science.gov (United States)

    Nielson, Katharine B.

    2014-01-01

    Language learners with high working memory capacity have an advantage, all other factors being equal, during the second language acquisition (SLA) process; therefore, identifying a pedagogical intervention that can compensate for low working memory capacity would be advantageous to language learners and instructors. Extensive research on the…

  20. Project report: Experimental planning and verification of working fluids (WP 5)

    DEFF Research Database (Denmark)

    Babi, Deenesh Kavi

    working fluid candidates a database is required that can be simultaneously searched in order to differentiate and determine whether the generated candidates are existing or novel. Also, the next step upon selection of the candidates is performing experiments in order to test and verify the generated...... working fluids. If performed properly, the experimental step is solely verification. Experiments can either be performed virtually (in order to further reduce the number of required experiments) and/or physically. Therefore the objective of this work was the development of a database of existing working......Computer-aided molecular design (CAMD) helps in the reduction of experiments for the selection/design of optimal working fluids. In reducing the number of experiments, solutions obtain by trial and error is replaced by solutions that are based on mixture-process properties. In generating optimal...